HomeMy WebLinkAbout08272025 Planning Agenda PacketREGULAR MEETING AGENDA
PLANNING COMMISSION
August 27, 2025
6:00 - 8:00 PM
Notice is hereby given that the Port Angeles Planning Commission will meet on Wednesday,
August 27, 2025 starting at 6:00 p.m. in the City Council Chambers in City Hall located at 321 E.
5th Street, Port Angeles, WA. This meeting will be conducted as a hybrid meeting. In hybrid
meetings, members of the public, Committee members, and City staff have the option to attend the
meeting in person at City Hall or remotely through the Webex virtual meeting platform. For those
planning to attend remotely, learn how to watch the meeting live and participate during the public
comment period by visiting: https://www.cityofpa.us/Live-Virtual-Meetings
For audio only please call: 1-844-992-4726
Use access code: 2553 310 8485
Webinar password: PC20250827 (72202508 when dialing from a phone or video system)
Once connected press *3 to raise your virtual hand, if you wish to make a comment or public
testimony. You will be notified when it is your turn to speak. This access code will work for the
August 27, 2025 meeting only.
If you are joining the meeting through the Webex link and wish to make a comment or provide
public testimony, please use the “raise your hand” feature in Webex. You will be notified when it
is your turn to speak.
Virtual Webex Meeting Link:
https://cityofpa.webex.com/cityofpa/j.php?MTID=mdd35ecc659932afd2afd50020db6e8bf
The meeting is open to the public.
I.CALL TO ORDER
II.ROLL CALL
III.PUBLIC COMMENT
IV.APPROVAL OF MINUTES
Minutes of the July 23, 2025 Meeting
V.ACTION/DISCUSSION ITEMS
1.Discussion: Comprehensive Plan Citywide Rezone
Staff presentation and Commission discussion of the proposed citywide rezone that
will accompany the Comprehensive Plan Periodic Update.
2.Discussion: Comprehensive Plan Periodic Update Element Review
Staff presentation and Commission discussion of proposed amendments to the Parks
and Recreation and Hazard Mitigation and Climate Resiliency Elements. Discussion
of previously presented Capital Facilities and Utilities and Public Services
Elements.
3.Discussion: Draft Housing Action Plan Review
Commission discussion of the draft Housing Action Plan.
VI.STAFF UPDATES
1.Monthly Building Report
2. Monthly Affordable Housing Report
3.Monthly Natural Resources Report
4.Quarterly Grant Report
5.Monthly Land Use Permitting Report
VII.REPORTS OF COMMISSION MEMBERS
VIII.PUBLIC COMMENT
IX. ADJOURNMENT
PLANNING COMMISSION MEETING
Port Angeles, Washington
July 23, 2025
This meeting was conducted as a hybrid meeting.
CALL TO ORDER - REGULAR MEETING
Chair Young called the regular meeting of the Port Angeles Planning Commission to order at 6:00 p.m.
ROLL CALL
Planning Commission Chair Young, Vice Chair Steiger, Commissioners: Schorr, Kiedrowski, McMillian.
Members Absent: Commissioners Mellema and Stanley
Staff Present: Community and Economic Development Director Shannen Cartmel, Planning Supervisor Ben
Braudrick, Housing Administrator Jalyn Boado, Senior Development Services Specialist Pat Bartholick.
PUBLIC COMMENT
John Ralston, Resident: Spoke against bicycle lane planning near the end of the Second Bridge. Mr. Ralston also
shared concerns related to development requirements (i.e. sidewalk installation requirements, required sewer capacity
study).
ACTION ITEMS
Action Item: Approval of Minutes of the May 28, 2025, Meeting
It was moved by Vice Chair Steiger and seconded by Commissioner Schorr to:
Approve the Minutes of May 28, 2025.
Motion carried 5-0.
Action Item: Approval of Minutes of the June 12, 2025, Meeting
It was moved by Vice Chair Steiger and seconded by Commissioner McMillian to:
Approve the Minutes of June 12, 2025.
Motion carried 5-0.
AGENDA ITEMS
1.Discussion: Draft Housing Action Plan
Staff provided a presentation and facilitated a robust discussion on the Draft Housing Action Plan. Commissioners
shared insights and feedback including:
•Commissioner McMillian emphasized prioritizing the blighted property reduction strategy and explored
connecting incentives for sweat equity.
•Commissioner Steiger raised concerns regarding rental data accuracy, highlighted successes in the plan such
as permit-ready plans and fee waiver expansions, and recommended partnerships with private companies for
weatherization. Also suggested a damage fund model for landlords based on Chelan/Douglas County.
•Commissioner Schorr highlighted low average rent figures, emphasized linking housing with economic
development and higher AMI, and recommended grants to address development roadblocks. Also supported
local sourcing in programs like the City Shade initiative.
August 27, 2025 Planning Commission Agenda Packet 1
•Commissioner Kiedrowski questioned nonprofit prioritization for the 935 W 10th project, supported permit-
ready plans and down payment assistance, and discussed potential for condo-style conversion of single-
family homes. Raised a concern over legal covenants restricting development.
•Commissioner Young acknowledged improvements in permitting, emphasized addressing unsheltered
individuals, and discussed impacts of infrastructure burdens and parking reforms.
•Additional discussions included exploring partnerships with local tree nurseries, use of local contractors and
materials, opportunities through cruise ship tourism, and questions around job-based housing demands.
2.Discussion: Draft Comprehensive Plan Element Review
a.Staff presentation and discussion of the draft Utilities and Public Services and Capital Facilities Elements
as a part of the 2025 Comprehensive Plan periodic update.
b.Discussion of the Utilities and Public Services and Capital Facilities Elements was moved to a future
meeting for the sake of time.
ACTION ITEMS
It was moved by Vice Chair Steiger and seconded by Commissioner McMillan to:
To extend the meeting by fifteen minutes
Motion carried 5-0.
STAFF UPDATES
Comprehensive Plan Periodic Update
Planning Supervisor Braudrick gave a brief update about the recent public engagement opportunities, the
Comprehensive Plan Open House, Neighborhood Walks and Survey. Overall, through the three public engagement
activities staff has received 100s of public comments. The goal is for staff to respond to each public comment and
give the Planning Commission the first look at the staff responses prior to the public hearings.
Monthly Building Report
Senior Development Services Specialist Pat Bartholick gave a brief overview of the monthly building report over
the last few months. As of now we are slightly ahead of permitting numbers in comparison to last year and ahead of
building permit valuation largely due to the middle school development.
Monthly Affordable Housing Report
Planner Boado gave a brief update about affordable housing programs. In the last May and June three fee waivers
we’re processed which saved developers more than $30k in permitting cost. A large NICE grant was also passed.
Land Use Report
Planning Supervisor Braudrick gave a report on the Rayonier site special meeting. A new associate planner/long
range and special projects administrator will be brought on in August to take over the land use permitting and
projects.
COMMISSION REPORTS
Chair Young, None
Vice Chair Steiger, None
Commissioners Schorr, Went to the Elwha Cultural Museum. The Rayonier site was built on a burial site.
Commissioners Stanley, None
August 27, 2025 Planning Commission Agenda Packet 2
Commissioners Kiedrowski, None
Commissioners McMillian, None
Commissioners Mellema, None
SECOND PUBLIC COMMENT
John Ralston, Resident made a statement about personal property and stormwater improvements. Talked about the
Housing Action Plan presentation. The permit ready plans are used in multiple jurisdictions. The 10th and C St
property is subject to a sewer capacity study. Blighted property may take a longer to accomplish.
ADJOURNMENT
Chair Young motioned to adjourn the meeting at 8:13 p.m.
Commissioner Stieger seconded the motion.
_____________________________________ _______________________________
Chair Young, Chair Jalyn Boado, Secretary
August 27, 2025 Planning Commission Agenda Packet 3
Parks, Recreation, & Open
Space Element
August 27, 2025 Planning Commission Agenda Packet 4
Introduction i Revised Introduction with updated Information The Parks, Recreation and Open Space Element
serves as a guide for the strategic development and ongoing management of the City's park system. It
provides a clear direction for realizing Port Angeles' vision for parks and recreation, encompassing several
key goals. These include optimizing the city's inherent connection with its exceptional natural environment,
ensuring a wide spectrum of recreational opportunities are available and accessible to everyone, fostering
vibrant and valued neighborhoods through access to parks, trails, and natural areas, and sustaining Port
Angeles' rich arts, cultural heritage, and overall sense of community. This framework underscores a
comprehensive approach to parks planning, recognizing their multifaceted role in recreation,
environmental stewardship, neighborhood enhancement, and the cultivation of a strong community
identity within Port Angeles. The Park Element sets the qualitative goals that the quantitative Levels of
Service standards will help to achieve and measure. These standards, such as park acreage per capita or
trail accessibility metrics, will be developed and applied in alignment with this overarching vision to ensure
the city effectively meets its park and recreation objectives for all residents.
August 27, 2025 Planning Commission Agenda Packet 5
City Parks and Recreational Facilities
The City of Port Angeles Parks and Recreation Department currently
manages a significant portfolio of land and facilities dedicated to
recreation and open space. This includes over 114 acres of developed
parkland, complemented by 81.5 acres designated for future park
development, and an additional 91.8 acres preserved as protected open
space. The developed parkland features a variety of recreational
amenities, such as 14 playground equipment sites, 13 baseball and/or
softball fields, 9 football and/or soccer fields, and 12 tennis courts.
Approximately 10 acres are occupied by community facilities, notably the
Senior and Community Services Center and the Vern Burton Community
Center, which offer diverse year-round recreational programs. Civic Field
serves as a comprehensive athletic complex equipped for soccer, football,
and baseball, complete with lighting for evening use, concession stands,
covered stadium seating, and locker rooms. The city also owns unique
facilities like the Feiro Marine Life Center situated in City Pier Park, and
cultural sites within Lincoln Park, including a traditional native longhouse,
the Loomis Building, and several other log structures. The Port Angeles
Fine Arts Center finds its home within Webster Woods Park, further
integrating arts and recreation. Additionally, the city maintains two public
walkways connecting downtown with the bluff residential area, one of
which culminates at the Conard Dyar Memorial Fountain. For maritime
access, the city operates a boat launch ramp and moorage floats at the
eastern end of Ediz Hook, and the city pier provides moorage for
transient boaters. Finally, the department maintains a significant portion
of the Olympic Discovery/Waterfront Trail, stretching from Morse Creek
to the Coast Guard Base entry on Ediz Hook and continuing through the
city to the western boundary at Lower Elwha Road. The city also owns
and operates the 41-acre Ocean View Cemetery. The Carnegie Library
building, adjacent to the former fire hall, has been repurposed into a
museum leased by the Lower Elwha Klallam Tribe.
i Updated Facilities Inventory
Facilities Inventory
Park Location Description Amenities
5th & Oak Park
136 W. 5th St. Port Angeles, WA 98362
This park is located on the corner of West 5th St. and Oak St. It is one of our smaller,
enclosed residential neighborhood parks.
It's the perfect place for youngsters to explore
the outdoors.
Dog Waste Bag Dispensers
Open Field
Park Benches
Picnic Tables
August 27, 2025 Planning Commission Agenda Packet 6
Playground
9/11 Memorial Waterfront Park 400 N. Francis St. Port Angeles, WA 98362
Formerly named Francis Street Park, this park is
a main access point for Waterfront
Trail/Olympic Discovery Trail users. Sweeping
views of the harbor are what makes this a community showcase park for our local citizenry and visitors. Features include handicapped parking for easy access to the trail and a lookout pavilion.
Dog Waste Bag Dispensers
Flag Pavilion Open Grass
Areas
Picnic Areas
Play Structures
Viewpoint
Walking Paths
Waterfront Trail Access
Campfire
Clubhouse
619 E. 4th St. Port
Angeles, WA 98362
The Campfire Clubhouse at Jessie Webster
Park provides rental space for meetings and
events. With a kitchen, restrooms, dining hall,
stage, meeting rooms, foyer, heat, and tables and chairs, it's a great place for events up to approximately 75 people.
Banquet Hall
Chairs
Clubhouse
Kitchen
Meeting Rooms
Rental Facility
Restrooms
Tables
Charles R. Willson Memorial Park
511 W. 7th St. Port Angeles, WA 98362
Charles R. Willson Park is located between the 8th Street Bridges on West 7th Street. This quiet neighborhood park offers a nice place for
people to play.
Basketball Court
Open Field
Picnic Tables
City Pier &
Hollywood
Beach
315 N. Lincoln St. Port
Angeles, WA 98362
The City Pier & Hollywood Beach is located at the north end of Lincoln Street on the waterfront in the heart of downtown Port Angeles. The City Pier is next to downtown area shopping, ferry service to Victoria, the
Waterfront Trail, and the home of the Arthur D.
Feiro Marine Life Center.
The pier offers fantastic views of the inner harbor, Port Angeles, and the Olympic Mountains.
Beach Access
Covered Stage
Dog Waste Bag Dispensers
Hollywood Beach
Park Benches
Picnic Tables
Restrooms
Viewing Tower
Walking Paths
Waterfront Trail Access
City Pier Moorage Floats 315 N. Lincoln St. Port Angeles, WA 98362
Ramps and moorage floats are provided,
temporary moorage is free, while overnight moorage is $20/night with a 10 night maximum. Moorage is provided on a first come, first served basis.
ADA Accessible
Seasonal Closures
August 27, 2025 Planning Commission Agenda Packet 7
Civic Field 307 S. Race St. Port
Angeles, WA 98362
Civic Field, a multipurpose sports stadium located across from Erickson Playfield, accommodates football, baseball, and soccer
with covered seating for about 2,500
spectators. In 2016, it received a modern LED
lighting system upgrade. Civic Field hosts all home games for Port Angeles High School's soccer, baseball, and football teams and, since 2017, has been the home field for the West Coast League's collegiate baseball team, the Port Angeles Lefties.
Baseball Field
Bleachers
Concession Stand
Football Field
LED Field Lighting
Locker Room
Parking
Rental Facility
Restrooms
Soccer Field
Stadium
Conrad Dyar
Memorial Fountain
West 1st Street and
North Laurel St. Port Angeles, WA 98362
Conrad E. Dyar Memorial Fountain Park,
situated in downtown Port Angeles at the
corner of First and Laurel Streets, honors a
former City Park Board chairman. Formerly the Laurel Street Circle, the park offers numerous seating areas, flower baskets, and a mural behind its fountain, making it a popular spot for shoppers and downtown visitors.
Flag Pavilion
Park Benches
Water Fountain
Crown Park 1921 W. 4th St. Port
Angeles, WA 98362
Crown Park is located on West 4th Street and sits on the bluff overlooking the former Nippon Paper Mill. Crown Park is a small neighborhood
park which offers unobstructed views of the
Strait of Juan de Fuca and the harbor to the
east. Crown Park also has a small playground, a small field, and benches.
Open Grass Areas
Park Benches
Picnic Tables
Playground
View Parking
Dream Playground 302 S. Race St. Port Angeles, WA 98362
The Port Angeles Dream Playground, a large community-built project completed in five days in September 2002 by over 2,000 volunteers using donated resources, was funded by over $185,000 raised from local businesses and more than 10,000 individuals. In 2009,
volunteers added an 800 square-foot covered
pavilion next to the playground.
Play Structures
Playground
Ediz Hook Boat Launch
700 Ediz Hook Road
Port Angeles, WA 98362
Annual passes are not currently for purchase,
and one-time use passes are not currently being collected for this location. Boat Ramp
Elks Playfield 533 W. 14th St. Port Angeles, WA 98362
Elks Playfield is located at 14th Street and Cedar Street, between the 8th Street Bridges. This large park accommodates several city sports, including soccer and softball. It also has six pickleball courts, a playground, and
restrooms.
Bleachers
Open Field
Pickleball Courts
Playground
Restrooms
August 27, 2025 Planning Commission Agenda Packet 8
Softball Diamond
Erickson Playfield 302 S. Race St. Port Angeles, WA 98362
Erickson Playfield, a 4.2-acre semi-wooded
park on Race Street across from Civic Field, is a
popular family destination offering a covered
picnic shelter, four tennis courts, a skate park, pump track, grass field with a calisthenics park, and the large, community-built Dream Playground for all ages. Its location also provides quick access to Olympic National Park.
Covered Picnic Area
Four Tennis Courts
Open Field
Parking
Picnic Tables
Playground
Pump Track
Restrooms
Skate Park
Erickson Skate
Park
302 S. Race St. Port
Angeles, WA 98362
The Port Angeles Skate Park is a multi-use built
recreational environment made only for the
use of the following non-motorized wheeled
devices: skate boards, bicycle motocross or BMX bikes, inline/roller skates, and scooters
Skate Park
Gateway
125 East. Front St.
Port Angeles,
WA 98362
The Gateway is on Front and Lincoln and
serves as the Public Transit Center for Port
Angeles. The Gateway can be rented for
events.
ADA Accessible
Parking
Pavilion
Restrooms
Harborview
Park
700 Ediz Hook Road
Port Angeles,
WA 98362
Located at the end of Ediz Hook, Harborview
Park features spectacular views of the Port
Angeles inner harbor and the Olympic
Mountains.
Beach Access
Dog Waste Bag Dispensers
Open Grass Areas
Picnic Tables
Restrooms
Haynes View Point
E. Front St. and N. Peabody St. Port Angeles, WA 98362
Haynes View Point is located at the foot of North Peabody Street. It offers an all-encompassing view of the harbor, Straits of Juan de Fuca, and Canada. This is a popular place for locals and visitors to sit and watch the
world go by.
View Parking
View Point
Hazel Porter Kiel Park 115 W. 13th St. Port Angeles, WA 98362
Hazel Porter Kiel Park is a small neighborhood
park located on 13th Street between Laurel and
Oak Streets. This quiet park offers a tennis court and open field with space for families to play and picnic.
Open Field
Picnic Tables
Tennis Court
James View Point
W. 2nd St. and Oak St. Port Angeles, WA 98362
James View Point is located on 2nd Street and Oak Street, at the top of the zigzag that begins on the south side of Laurel Street. The small park offers a great view of the harbor, the
Open Grass Areas
Park Benches
View Point
August 27, 2025 Planning Commission Agenda Packet 9
Strait of Juan de Fuca, and Canada.
Jessie Webster Park
3rd Street and Eunice Street Port Angeles, WA 98362
Jessie Webster Park is located on 3rd Street and Eunice Street, behind Swain's General Store. The park is wooded and has a walking trail as well as a rental facility called the Campfire Clubhouse.
Dog Waste Bag Dispensers
Open Space Areas
Picnic Tables
Walking Paths
Lincoln Park
1900 W. Lauridsen
Blvd. Port Angeles,
WA 98362
Lincoln Park is in the area of 1500 West Lauridsen Boulevard, just east of the Fairchild International Airport. Two ponds in the
northeastern corner are home to many
different species of ducks and birds. Fishing is
available for youth 14 years of age and younger without a license.
BMX Track
Clubhouse
Disc Golf Course
Dog Park
Dog Waste Bag Dispensers
Loomis Rentals
Open Field
Picnic Tables
Playground
Restrooms
Trails
Water
Youth Baseball Field
Lions Park
601 E. Whidby Ave.
Port Angeles,
WA 98362
Lions Park is located on the 600 block of Whidby Avenue just south of Lauridsen
Boulevard and is also accessible from Lauridsen
Boulevard by a fenced path. This is a quiet
neighborhood park with a lot of open space and a small covered area
Covered Picnic Area
Open Field
Open Grass Areas
Park Benches
Picnic Tables
Ocean View Cemetery 3127 W. 18th St. Port Angeles, WA 98362
Ocean View Cemetery is owned and operated by the City of Port Angeles Parks & Recreation Department. The land for Ocean View Cemetery was acquired from the Federal Government largely through the efforts of
Matilda C. (Dudley) Cooper. Mrs. Cooper
started a petition in the early 1890s to secure
land for the City to use as a cemetery. By 1894,
the 54-acre cemetery was ready for business.
Pebble Beach Park
Front Street & Oak St. Port Angeles, WA 98362
In 2019, the City approved the renaming of West End Park to sŋaʔŋáʔant (Pebble) cáwŋən (Beach) ʔəssaqɬúŋt (Park) in both Klallam and English. Located where Front Street and Oak Streets meet, sŋaʔŋáʔant cáwŋən ʔəssaqɬúŋt -
Pebble Beach Park features two sand pocket
Open Grass Areas
Park Benches
Parking
Rental Facility
August 27, 2025 Planning Commission Agenda Packet 10
beaches with water access, plazas, a viewing platform, lawn and gathering space, benches, nearby public restrooms and parking, and
access to the Waterfront Trail and Esplanade.
Viewing Tower
Walking Paths
Water
Waterfront Trail Access
Port Angeles Fine Arts Center & Webster's
Woods Art Park
1203 E. Lauridsen Blvd. Port Angeles,
WA 98362
The Port Angeles Fine Arts Center (PAFAC)
gallery occupies the former 1951 residence and
studio of Esther and Charles Webster, a Paul Hayden Kirk-designed example of modern Northwest architecture featuring extensive glass and timber. Its location on the Olympic foothills offers panoramic views of the city, the Strait of Juan de Fuca, Vancouver Island, and
the Olympic National Park mountains. Adjacent
to the gallery is Webster's Woods Art Park,
established in 2000, which annually showcases new outdoor sculptures through the "Art Outside" program, inviting visitors to explore the art integrated into the natural woodland environment year-round for free.
Quinn Redlin Kintner Memorial Park
1006 E. Georgiana St. Port Angeles, WA 98362
Quinn Redlin Kintner Memorial Park, formerly Georgiana Park, is a small park located in Port
Angeles' medical district at the corner of
Washington and Georgiana Streets. Following
a community fundraising effort that began in 2016, the park was renovated with a new, fully ADA-accessible playground, funded in part by a donation from the Quinn Redlin Kintner family's endowment. In recognition of this contribution, the park was renamed in her
honor in 2017, with the playground completed
in the fall of 2018.
ADA Accessible
Dog Waste Bag
Dispensers
Open Grass Areas
Park Benches
Picnic Tables
Playground
Rains Park
921 E. 8th St.
Port Angeles, WA 98362
Rains Park is a nice neighborhood park with a
play structure and open space located on 8th Street just east of Race Street.
Open Field
Picnic Tables
Playground
Rayonier
Locomotive #4
Chase Street & Lauridsen Boulevard
Port Angeles, WA
98362
The Rayonier Locomotive #4 was acquired by Rayonier in 1947 and used to load and move lumber for Rayonier’s mill and products to the main lines leaving for other sites such as Port Townsend and Portland. After the engine was
retired, it was donated to the City of Port
Angeles in 1960. The locomotive now sits at
one of the City’s traffic islands off of Lauridsen Boulevard, directly across from the Library.
Sail & Paddle Park
700 West Ediz Hook Rd. Port Angeles, WA 98362
Sail & Paddle Park is located on Ediz Hook just east of the former Nippon Paper Mill. This park features great views of the harbor, Port Angeles, and the Olympic Mountains. The park also has beach access for launching kayaks.
Beach Access
Dog Waste Bag Dispensers
Open Grass Areas
August 27, 2025 Planning Commission Agenda Packet 11
Park Benches
Picnic Tables
View Parking
Shane Park 613 S. G St. Port Angeles, WA 98362
Shane Park, situated on G Street between
Seventh and Eighth Streets, features a fully
accessible ADA-compliant playground, large ballfields, and the Born Learning Trail, an interactive path for parents and children. This expansive park is a central location for various outdoor sports activities in Port Angeles, hosting both youth and adult soccer and
softball leagues.
ADA Accessible
Basketball Court
Open Field
Park Benches
Parking
Picnic Tables
Playground
Restrooms
Soccer Field
Softball Diamond
Walking Paths
Valley Creek
Estuary
313 Marine Drive
Port Angeles, WA
98362
Valley Creek Estuary was built through a combined effort between the City of Port Angeles and other local organizations. The
park has views of the Port Angeles harbor,
Olympic Mountains, Straits of Juan de Fuca,
and Canada.
Friendship Bridge
Open Grass Areas
Park Benches
Pavilion
Viewing Tower
Waterfront Trail Access
Vern Burton Community Center
308 E. 4th St. Port Angeles, WA 98362
The centrally located Vern Burton Community
Center offers a large, divisible main hall (8,100
sq ft, capacity 1100 standing/500 banquet) with an atrium and accessible restrooms, plus a smaller, flexible meeting area (capacity 55). Originally a high school gym, it retains hardwood floors and a high ceiling suitable for sports. A well-equipped commercial kitchen is
available, along with tables and chairs for up to
500 people. Its downtown location provides
easy access to transportation and amenities.
ADA Accessible
Banquet Hall
Basketball Court
Chairs
Fully Functioning Kitchen
Indoor Sports
Meeting Rooms
Parking
Pickleball Courts
Public Address System
Restrooms
Tables
TOA Stereo Music System
Volleyball
August 27, 2025 Planning Commission Agenda Packet 12
Veterans Memorial Park
217 S. Lincoln St. Port Angeles, WA 98362
Veterans Memorial Park is located just west of
the Clallam County Courthouse on Lincoln
Street. This memorial is dedicated to all veterans who have served our country in war and peace. The park, originally named Central Park, was renamed in 1986 in honor of those who served in all branches of the armed forces and all conflicts since the Civil War.
Flag Pavilion
Memorial Markers
Open Grass Areas
Park Benches
Reflection Pond
Walking Paths
Volunteer Field West 18th & South L Street Port Angeles,
WA 98362
Volunteer Field is a 7-acre park and athletic complex located adjacent to Fairchild International Airport and northwest of Lincoln Park. Both baseball and soccer are played here during different times of the year. Installed throughout the end of 2023, a new, top-of-
the-line turf infield has been in use since Spring
of 2024!
Volunteer Field is a scheduled facility. Please contact our office for more information regarding use of the facility.
Baseball Field
Football Field
Parking
Restrooms
Soccer Field
Turf Infield
Waterfront Trail (Olympic
Discovery Trail)
Lincoln St. and Front St Port Angeles, WA
98362
The Waterfront Trail follows the waterfront of Port Angeles. It extends from the Coast Guard Station entrance gate on Ediz Hook and wraps around the waterfront, connecting with the
Olympic Discovery Trail. The Olympic
Discovery Trail extends to Sequim with plans to
lengthen the trail further to the east and west.
Beach Access
Dog Waste Bag Dispensers
Park Benches
Trails
Walking Paths
Webster's Woods Art Park
1203 E. Lauridsen Blvd. Port Angeles, WA 98362
The first sculptures were installed in Webster's
Woods in 2000 and every year new pieces are presented through the Center's Art Outside program. Visitors can explore the side independently by using the park trails and discover artworks hanging in trees, burrowing in the ground, or camouflaged by the natural
beauty of the foliage. Webster's Woods is free
and open to the public year-round.
Wolverton Park & Community Garden
825 W. 11th St. Port Angeles, WA 98362
Wolverton Park is located on West 11th & A
Street in a residential neighborhood. Half of the park is open space, and the other half is a Community Garden.
Community Garden
Open Field
Level of Service
Forecasted Needs
Forecasted needs for Port Angeles parks likely involve maintaining and
upgrading existing infrastructure while addressing aging facilities to
ensure safety and functionality. Depending on population growth and
Level of Service standards, expanding parkland and improving equitable
August 27, 2025 Planning Commission Agenda Packet 13
access across neighborhoods may be necessary. Enhancing recreational
opportunities through diverse facilities, improving accessibility for all
abilities, and continuing the protection of natural areas and open spaces
are also anticipated. Furthermore, ongoing trail development and
connectivity, along with understanding and responding to evolving
community needs through engagement, will shape future park priorities
and development within the city.
The Capital Facilities Plan, attached in the Appendix, details upcoming
capital improvement projects for parks and recreation over the next six-
year planning horizon. This plan, which includes potential funding
avenues, is updated annually to reflect evolving needs and priorities for
the city's park system.
i Remove old Facilities Inventory.
Goals and Policies
Goal 10A To acquire, develop, renovate and maintain a sustainable
system of parks, recreational facilities, and open spaces to
ensure that the contributions of natural resources and
recreation to human well-being are maintained and
recognized as a value.P-10A.01 Provide Port Angeles
with a diversity of open spaces, parks, and recreation
facilities and programs appropriately distributed
throughout the City.
P-10A.02 Ensure that equality is achieved to the extent possible in
the types and variety of facilities, quality of maintenance,
and the range of recreation services provided.
P-10A.03 Retain and reflect the natural beauty that attracts visitors,
business, and residents to the area.
P-10A.04 Forge effective partnerships and strengthen ties with other
public, private, and non-profit providers including
providing high quality recreational opportunities.
P-10A.05 Identify waterfront improvements to increase marine
transportation and recreation.
P-10A.06 Identify appropriate locations for small (pocket) parks,
community gardens and food forests throughout the
community and integrate them into its Parks system.
August 27, 2025 Planning Commission Agenda Packet 14
P-10A.07 The City should continue to provide or participate with
private sponsors to provide high quality recreational
opportunities.
P-10A.08 Continue to participate as a partner in the extension of the
Olympic Discovery Trail through the City to the western
City limits.
Goal 10B To enhance the quality of life in the community by
providing facilities, services, and programs that
offer positive opportunities for building healthy,
safe, and productive lives to the broadest segment
of the population.
P-10B.01 Provide consistently high-quality recreational experiences
to residents and visitors through a wide variety of park
types and features.
P-10B.02 Strive for excellence through efficient, accurate, and skillful
performance in every process, service and product
delivered by the Parks and Recreation providers.
P-10B.03 Keep citizens involved and informed about parks and
recreation issues, services, and family friendly features and
amenities.
P-10B.04 Manage Park facilities in a manner that will ensure public
safety, identify family friendly features and amenities, and
keep the parks free of misuse to the greatest extent
possible and resulting in a sustainable and resilient park
system.
P-10B.05 Incorporate health and nutrition into parks and recreation
programming.
P-10B.06 Provide high quality services, emphasize the design of
park areas to reduce long-term maintenance and
operating costs, and implement improved technology to
conserve limited resources such as water, power, and
people.
P-10B.07 Provide programs and opportunities that are sensitive to
the needs of all of its citizens, including those with limited
financial resources, disadvantaged youth, the elderly, the
disabled, and those with other special needs.
August 27, 2025 Planning Commission Agenda Packet 15
Goal 10C To establish and protect a visual character of the
community through open spaces, streetscapes,
borrowed landscapes, and publicly owned natural
resource areas.
P-10C.01 Strive to protect and retain the natural beauty of the area.
P-10C.02 Supplement and enhance the visual attractiveness of the
city through the use of formal landscaping in street
medians, city entryways, and along sidewalks, as well as
the use of other public spaces, flower beds, and street
trees. Emphasize use of planter strips with drought tolerant
vegetation and bio-retention facilities.
Goal 10D To promote economic growth through
recreational tourism and attract visitors and new
business by enhancing the image of the
community through beautification and recreation
programs.
P-10D.01 To encourage efficient transportation systems, support the
use of shuttle services during events to move participants
between venues.
Goal 10E To provide a system of walking trails and bicycle
paths to complement and coordinate with the
existing street system and provide recreational
opportunities and physical activity while reducing
the dependence on traditional automobile
transportation.
P-10E.01 The City should continue efforts to improve or provide
access to Valley, Tumwater, Peabody, Ennis and White's
Creeks through the development of an integrated trails
system.
Goal 10F To encourage the development of parks and
recreational opportunities for all residents of the
City and to increase access to natural areas in a
manner that minimizes adverse impacts and
achieves the desired urban design of the City.
August 27, 2025 Planning Commission Agenda Packet 16
P-10F.01 Preserve and maintain unique or major physical features
contained within the boundaries of City parks and
recreational areas for access and enjoyment by residents
of the community.
P-10F.02 Adapt parks and recreation facilities to reflect the risks of
climate change including sea level rise, extreme heat,
extreme precipitation, and drought. Prioritize actions
based on the critical nature of the facility.
i New Goal and assoc. policies moved from Land Use Goal G-3P.
G-3P [reloc.] To encourage the development of parks and
recreational opportunities for all residents of the
City and to increase access to natural areas in a
manner that minimizes adverse impacts, and
achieves the desired urban design of the City.
P-3P.01 [reloc.] Ensure that the development and planning of parks and
recreational facilities is consistent with the Capital Facilities
Element.
P-3P.02 [reloc.] Distribute public parks and recreational facilities equitably
throughout the City to afford access to all residents.
i Old policy P-3P.03 below amended to focus it on only a single topic.
P-3P.03 [reloc.] Utilize land donated for public use to provide common
open space, public buildings, parks, and recreational
opportunities.
P-3P.04 [reloc.] Preserve and maintain unique or major physical features
contained within the boundaries of City parks and
recreational areas for access and enjoyment by residents
of the community.
P-3P.05 [reloc.] Adapt parks and recreation facilities to reflect the risks of
climate change including sea level rise, extreme heat,
extreme precipitation, and drought. Prioritize actions
based on the critical nature of the facility.
P-3P.06 [reloc.] Consider the relationship of parks and recreation facilities
to emergency management and human health such as
facilities used as community hubs. Consider business
August 27, 2025 Planning Commission Agenda Packet 17
continuity and economic development, such as the wharf,
beaches, and trails.
P-3P.07 [reloc.] Cooperate with the County and other jurisdictions in
planning, funding, constructing, and managing multi-
purpose recreation and transportation trails which link
together various areas of the City, the Port Angeles Urban
Growth Area (PAUGA), and other areas of the County and
region. Adapt trail designs, materials, and locations to
reflect the risks of sea level rise.
August 27, 2025 Planning Commission Agenda Packet 18
Hazard Mitigation & Climate
Resiliency Element
August 27, 2025 Planning Commission Agenda Packet 19
Introduction
The Hazard Mitigation and Climate Resiliency Element addresses the
social, economic, and environmental sustainability of the City of Port
Angeles to help better prepare the community members against climate
impacts and natural hazards. This element encompasses natural hazards
identified in the 2024 - 2029 Clallam County Multi-Jurisdictional Hazard
Mitigation Plan as well as the climate resiliency priorities at the citywide
and city government levels identified in the 2023 Climate Resiliency Plan.
This element reflects the unique priorities and values of our community
while prioritizing impactful resilience actions that can be taken to improve
the resilience of the community over the coming years. Through the goals
and policies outlined below, the City will work towards building
community resilience to help better prepare for natural hazards and
climate impacts, reduce greenhouse gas emissions from local sectors and
activities, and works towards a carbon-neutral future.
Existing Conditions
According to a 2019 Greenhouse Gas Emissions study, the City of Port
Angeles’ residents, businesses, employees, and visitors produced 132,597
metric tons of CO2 which is approximately 6.7 MTCO2e per person. Most
of these emissions (68%) came from transportation and mobile sources,
primarily on-road vehicles (59.3%). The second leading contributor to
greenhouse gas emissions was waste at 15%, followed by process &
fugitive emissions at 14.4%. The City’s goal to reduce greenhouse gas
emissions and achieve carbon neutrality by 2030 will only be achieved
through the implementation of the Climate Resiliency Plan and
incorporation of goals and policies directly related to hazard mitigation
and climate resiliency.
Key hazards identified in the Multi-Jurisdictional Hazard Mitigation Plan
include drought, flood, landslide, tsunami, sea level rise, wildfire, and
wildfire smoke, among others. Past growth and development indicate that
vulnerability to the identified natural hazards have generally increased for
the City of Port Angeles since the previously prepared 2019 MJHMP and
August 27, 2025 Planning Commission Agenda Packet 20
will continue to increase over time. Since 2018, the City has reported
several major disaster declarations including severe winter storms,
straight-line winds, flooding, landslides, mudslides, snowstorms, and the
COVID-19 Pandemic. Understanding the increased frequency of these
natural hazards further illustrates the need for the City to improve its
community resilience to existing and future hazards.
Where We are Headed
To achieve carbon neutrality by 2030 while also bolstering our
community’s resilience to natural hazards, the City will need to implement
mitigation and adaptation measures across a variety of sectors.
Greenhouse gas emission reduction alone will not get us to carbon
neutrality; further goals and policies must be implemented to increase
carbon sequestration throughout the city, increase the resiliency of our
forested and natural areas, and allow for adaptive and best management
practices to ensue as conditions change over the years, while balancing
the need for housing demands.
i Below goal is adapted from the Land Use element goal G-3R.
Goal 1: Protect and improve ecosystems by increasing
resilience to climate hazards that pose a risk to
forest health, fish and wildlife habitats, and water
quality. (Modified from Goal G-3R).
Policy 1.1 Establish and implement an Urban Forestry Program
intended to retain, restore, and enhance the overall tree
canopy and forest health throughout the city, including its
critical areas.
Policy 1.2 Develop a Tree Protection Ordinance for all new
developments requiring a minimum percentage of trees to
be retained during development, including best
management practices to ensure the health of the trees is
maintained through all phases.
Policy 1.3 Conduct annual or biannual forest health assessments and
tree risk assessments in all City-owned open spaces and
forested parcels to prioritize risk reduction and forest
health.
August 27, 2025 Planning Commission Agenda Packet 21
i Below goal is adapted from the Land Use element goal G-3B.
Goal 2: Resource protection, sustainability, and climate
change. Establish and promote strategies to ensure
Port Angeles is a sustainable and resilient
community through resource conservation. Protect
and enhance the area’s unique, natural, historical,
archaeological, and cultural amenities. (Goal G-3B)
Policy 2.1 Assess climate migration impacts with forecasting every
five years. Integrate the findings into the Comprehensive
Plan, infrastructure plans, revenue and expense
forecasting, and housing assessments.
i Below policy is adapted from the Land Use element policy P-3B.01.
Policy 2.2 Participate in State and Tribal government programs for
the identification, preservation, and restoration of sites and
structures that have historical or cultural significance.
i Below policy is adapted from the Land Use element policy P-3B.02.
Policy 2.3 Require low impact development techniques, including
Green Building, where feasible, in all new developments.
i Below policy is adapted from the Land Use element policy P-3B.04.
Policy 2.4 Evaluate risks of development on coastal bluffs that are
impacted by sea level rise and erosion.
i Below policy is adapted from the Land Use element policy P-3E.08.
Policy 2.5 Encourage design of new development that maximizes
southern exposures and solar efficiency, protects from
prevailing winds, and is designed to minimize energy use.
i Below policy is adapted from the Land Use element policy P-3E.06.
Policy 2.6 Encourage development to preserve native vegetation
when feasible and use drought tolerant species in new
landscaping, considering the impacts of climate change on
our natural and built environment.
August 27, 2025 Planning Commission Agenda Packet 22
Policy 2.7 Work with conservation partners to establish a native plant
nursery and seed bank to support long-term restoration
and carbon sequestration efforts.
Goal 3: Protect and enhance the climate resilience of
urban forests by implementing climate-smart
forest management practices.
Policy 3.1 Create and adopt an Urban Forest Management and
Implementation Plan to maintain and expand tree canopy
cover, improve tree and watershed health, prioritize
carbon sequestration, and build climate resilience.
Policy 3.2 Ensure all urban forest management plans include
considerations for the impacts of climate change.
Policy 3.3 Encourage private forest landowners to increase the
climate resilience of forests, steams, and associated ravines
on their lands by making urban forest management plans
publicly available, incentivizing the use of best
management practices in forest management.
Policy 3.4 Perform forest health assessments in public spaces and
sensitive areas and plan for their future success given the
known climate hazards most likely to affect their growth.
Policy 3.5 Begin planting trees and other vegetation in parks and
open spaces using a combination of assisted population
migration and assisted range expansion in preparation for
warmer, drier summers.
August 27, 2025 Planning Commission Agenda Packet 23
Goal 4: Increase tree canopy cover to reduce heat islands,
improve carbon sequestration, reduce stormwater
runoff and improve air quality, prioritizing
neighborhoods and streets with the lowest amount
of existing green infrastructure.
Policy 4.1 Continue the City Shade Street Tree Program to
incentivize the installation of street trees throughout the
community, aiming for a citywide tree canopy coverage
target of 30%.
Policy 4.2 Update Port Angeles Municipal Code to reflect the need
for improvements to the urban forest, specifically street
trees and green infrastructure.
Policy 4.3 Maximize tree canopy coverage in surface parking lots.
Policy 4.4 Conduct canopy assessments on a routine basis to
determine the effectiveness of programs such as the City
Shade Street Tree Program.
Policy 4.5 Incentivize the use of drought-tolerant native and non-
native, non-invasive species in new development and
redevelopments.
Goal 5: Ensure the protection and restoration of streams,
riparian zones, estuaries, wetlands, and floodplains
to achieve healthy floodplains that are more
resilient to climate change.
Policy 5.1 Protect and restore watershed-scale processes to
maximize the ecological benefits and climate resilience of
riparian ecosystems, utilizing best available science.
Policy 5.2 Protect and restore riparian vegetation to reduce erosion,
provide shade, and support other functions that improve
the resiliency of our urban streams.
Policy 5.3 Increase aquatic habitat resilience to low summer flows by
increasing the time water is stored on the landscape
through floodplain connectivity, restoration and retention
of native vegetation.
Policy 5.4 Update the Critical Areas Ordinance to expand the
protection and restoration of environmentally sensitive
areas throughout the city, meeting state and federal
August 27, 2025 Planning Commission Agenda Packet 24
requirements and utilizing best management practices
throughout.
Policy 5.5 Acquire properties or conservation easements on
properties that are most vulnerable to climate-
exacerbated hazards with the highest likelihood of
becoming unsuitable for future development.
Goal 6 Improve emergency preparedness, response, and
recovery efforts to mitigate risks and impacts to
climate hazards such as extreme heat, drought,
flooding, sea level rise and wildfire. (Modified from
Goal G-5F)
Policy 6.1 Adopt the 2025 Clallam County Multi-Jurisdictional Hazard
Mitigation Plan in its entirety.
Policy 6.2 Identify and prioritize critical facilities within Port Angeles in
need of back-up generators.
Policy 6.3 Protect and enhance the climate resilience of urban forests
by implementing climate-smart forest management.
Policy 6.4 Identify the Wildland-Urban Interface and implement
strategies for reducing wildfire risk potential in these areas.
Policy 6.5 Develop a community-wide wildfire resilience strategy to
improve emergency response capabilities, create fire-
resilient landscapes, protect the local economy, and foster
short- and long-term recovery in the event of a wildfire.
i Below goal and policies being considered for placement in this element or the Land Use element,
where it exists today.
Goal 7: Environmentally Hazardous Sites. Actively pursue
and participate in environmental remediation of
contaminated sites and vacant industrial lands
using best available science.
Policy Establish a vision for the future use and development of
the old Rayonier Mill site based on post-cleanup
conditions and development capacity, housing needs,
economic development potential, enhanced public
August 27, 2025 Planning Commission Agenda Packet 25
shoreline access, and opportunities to preserve of open
space and enhanced and marine wildlife habitat.
Policy Designate the Rayonier cleanup sites on M Street as future
open space.
Policy Explore funding opportunities to assist with the cleanup of
environmentally hazardous sites throughout town,
improving the economic development and feasibility of
these locations.
i Below goal is adapted from the Land Use element goal G-3N.
Goal 8: Make Port Angeles food secure by promoting local
and regional sustainable agriculture, utilizing
multiple sources for food production and
procurement, and increasing food production
within the City. (Goal G-3N)
i Below policy is relocated from Land Use policy P-3N.02.
Policy 8.1 Encourage partnerships between local farms/farmers and
residents to establish local food production projects and
local composting and green waste recycling projects.
Policy 8.2 Connect local farms/farmers with the North Olympic Land
Trust for the preservation of farmland through the use of
conservation easements.
i Below policy is adapted from Land Use policy P-3N.03.
Policy 8.3 Facilitate policies between the Department of Community
and Economic Development and the Department of Public
Works & Utilities that foster agreement and resource
availability systems for allowing gardening for food,
habitat, or both in the right-of-way (e.g., planting strips)
and explore irrigation and planting incentives.
Policy 8.4 Update the list of approved street trees in the Urban
Standards and Guidelines to include a variety of fruit
bearing trees.
i Below policy is adapted from Land Use policy P-3N.05.
August 27, 2025 Planning Commission Agenda Packet 26
Policy 8.5 Update language around animal husbandry within the City
to break down barriers to owning and raising small
livestock.
Goal 9: Ensure environmental justice by providing all
residents an equitable opportunity to learn about
climate impacts, influence policy decisions, and
take actions to enhance community resilience.
Policy 9.1 Continue to implement residential conservation and
rebate programs to provide equitable access to energy
saving opportunities.
Policy 9.2 Ensure all community members have equitable access to
green space within 1/3 mile of their home.
Policy 9.3 Utilize a variety of mechanisms for disseminating
information regarding climate hazards and preparedness,
including the City’s website, social media platforms, City
Council meetings, utility billing stuffers, and posting
information at City Hall.
Goal 10: Improve public transit, active transportation, and
zero-emission vehicle access, making
transportation safer, cleaner, and more accessible
to all community members.
Policy 10.1 Improve trails, sidewalks, streets, and public facilities to
encourage walkability and non-motorized transportation.
Policy 10.2 Increase multimodal capacity in coordination with the
location of higher-density housing and commercial centers
to reduce single-occupancy vehicle dependence and
greenhouse gas emissions.
Policy 10.3 Incentivize electric vehicle infrastructure in new residential
and commercial developments.
Policy 10.4 Incentivize electrification of the city’s Port infrastructure
and allow marine electrification.
Policy 10.5 Explore alley conversion into attractive pedestrian zones
for improved access to local businesses.
Policy 10.6 Encourage development of low-carbon-impact
transportation infrastructure.
August 27, 2025 Planning Commission Agenda Packet 27
Capital Facilities Element
August 27, 2025 Planning Commission Agenda Packet 28
Introduction
i Replaced and Updated Introductory Text
The Capital Facilities element directs the long-range development and maintenance of
all facilities and capital assets that support residents, businesses, and overall quality of
life. These essential assets form the very foundation upon which a thriving community is
built. Recognizing their critical importance, the Washington State Growth Management
Act (GMA) places significant emphasis on the planning and provision of adequate capital
facilities to accommodate growth and maintain essential services. Understanding these
requirements and exploring potential funding avenues within the city, as well as
acknowledging the role of alternate service providers, is crucial for the continued
prosperity of Port Angeles.
The Growth Management Act (RCW 36.70A) mandates that local governments in
Washington engage in comprehensive planning. A key component of this planning
process is the development of a Capital Facilities Plan (CFP). The GMA requires that the
CFP include a thorough assessment of the current condition, capacity, and service levels
of all city-owned infrastructure, as well as a forecast of future needs based on projected
population and employment growth. Furthermore, the city must establish desired levels
of service standards defining the quality and quantity of public services to be provided.
The CFP must also identify how the necessary capital improvements will be financed,
outlining potential local, state, and federal sources, and establish a prioritized timeline
for the construction, expansion, or replacement of capital facilities. A cornerstone of the
GMA, concurrency requires that adequate public facilities and services are in place or
funded to support new development at the time of occupancy, without diminishing
existing service levels, necessitating a close link between land use planning and capital
facilities planning.
To address its capital facility needs, the City has several potential funding sources at its
disposal. These may include a portion of property tax levies, which can be dedicated to
capital projects, potentially involving existing levies or voter-approved bond measures
for larger initiatives. Additionally, a portion of the city's sales tax revenue can be
allocated to capital improvements. User fees for services like water, sewer, and
stormwater can include a capital component to fund system upgrades and expansions,
and the real estate excise tax (REET), a tax on the sale of real property, provides a
dedicated funding source for capital projects. Impact fees, one-time charges levied on
new development, can help offset the cost of providing public facilities necessitated by
August 27, 2025 Planning Commission Agenda Packet 29
that growth. Furthermore, the city can actively pursue state and federal grants and low-
interest loans to supplement local funding for specific capital projects, and collaborations
with private entities or philanthropic organizations can sometimes provide funding or in-
kind contributions for certain facilities, such as parks or community centers. This element
looks at the broader view of funds while the Capital Improvement Program (CIP) in
Appendix A are specific facility projects that have realistic funding sources assigned
during the annual budget cycle.
The City of Port Angeles directly provides and maintains a diverse range of capital
facilities, including:
• Water System: Water treatment plants, storage reservoirs, and distribution
pipelines.
• Wastewater System: Collection pipes, treatment plants, and discharge
infrastructure.
• Stormwater System: Drainage pipes, detention ponds, and outfalls.
• Parks and Recreation Facilities: Parks, trails, sports fields, community centers, and
playgrounds.
• Public Safety Facilities: Police station, fire stations, and emergency operations
center.
• General Government Facilities: City hall, public works buildings, and other
administrative offices.
While the City is directly responsible for many core capital facilities, it's important to
recognize that some essential services and infrastructure are provided by alternate
entities. Special purpose districts, like the William Shore Aquatic Center, North Olympic
Library System, and Port of Port Angeles operate independently and are responsible for
their own capital facilities and service provision within their defined boundaries, which
may overlap with the city. Telecommunication companies own and operate the capital
facilities for internet, phone, and cable services. Understanding the roles and
responsibilities of these alternate providers is crucial for effective regional planning and
coordination, and the City of Port Angeles must work collaboratively with these entities
to ensure seamless service delivery and avoid duplication of effort.
i Added in information and list of EPF’s
Essential Public Facilities (EPFs) are the backbone of any thriving community, delivering
critical services such as public safety, education, and healthcare. Understanding what
existing facilities are available is vital, as this information lays the groundwork for creating
effective future policies that ensure everyone continues to have easy access to these
essential services, ultimately supporting the well-being of the entire community. The
following is an initial inventory of existing Essential Public Facilities within the Port
Angeles area that are provided by alternative providers:
• Airports: Fairchild International Airport
August 27, 2025 Planning Commission Agenda Packet 30
• State Education Facilities: Peninsula College
• State or Regional Transportation Facilities (as defined in RCW 47.06.140):
o Black Ball ferry terminal
o Marine port facilities and connecting transportation corridors
o Highway 101 and 117
o WSDOT maintenance yard
o Clallam Transit yards
• Regional Transit Authority Facilities (as defined in RCW 81.112.020): This category
may be covered by the existing Clallam Transit yards; further confirmation is
needed.
• State and Local Correctional Facilities: Jail at the Clallam County campus and the
Juvenial Services and Detention Center on East 18th Street.
• Solid Waste Handling Facilities: City-owned transfer station on the west side of
town
Goals and Policies
i Goal 8A has equity statements added
Goal 8A To provide and maintain safe and financially feasible urban
services and capital facilities at or above stated levels of service
to all City residents and the general public. Ensure equitable
access and outcomes for all community members, particularly
those historically underserved. Regularly assess service levels
and outcomes across different demographics and geographic
areas to identify and address disparities.
i P-8A.01 has equity statements added
P-8A.01 The Comprehensive Plan should establish general level of service
standards for each urban utility and service. Such standards should be
used to determine the impacts of development. These standards should
be developed with an explicit focus on achieving equitable service
delivery and should be regularly evaluated for their impact on different
communities within the city. The evaluation process should include
community feedback and disaggregated data analysis.
i P-8A.02 has equity statements added
August 27, 2025 Planning Commission Agenda Packet 31
P-8A.02 Develop individual comprehensive service and facility plans for the
following capital facilities and/or services:
• Transportation, including streets, and non-motorized (bikeways and
pedestrian walkways),
• Water system,
• Sanitary sewer system,
• Electrical system,
• Stormwater,
• Solid Waste,
• Possible inclusion of Combined Sewer Overflow,
• Parks and recreation services, and
• Emergency services (police, fire, and medical response). These
standards should be developed with an explicit focus on achieving
equitable service delivery and should be regularly evaluated for their
impact on different communities within the city. The evaluation
process should include community feedback and disaggregated data
analysis.
i P-8A.03 has equity statements added
P-8A.03 Each comprehensive service and facility plan should be consistent with
the Comprehensive Plan, the County-Wide Planning Policy, and the State
Growth Management Act. Furthermore, these plans should actively work
towards achieving equitable service provision and inclusive community
benefits, with clear accountability measures.
i P-8A.04 has equity statements added
P-8A.04 At a minimum, ensure the continuation of established level of service
standards for all urban utilities and services to the extent and in the
manner provided herein. This continuation should be coupled with
ongoing analysis to identify and eliminate any existing inequities in service
delivery or access. This analysis should inform budget allocations and
service improvements.
i P-8A.05 has equity statements added
P-8A.05 Cooperate with the appropriate private and/or public agencies to develop
individual comprehensive service and facility plans for each of the
following utilities and/or services:
• Telecommunications,
• Schools,
• Mass transportation, and
August 27, 2025 Planning Commission Agenda Packet 32
•Solid waste collection and disposal. This cooperation should include
actively seeking input from diverse community stakeholders, including
those often excluded from decision-making processes, to ensure that
plans address equity concerns.
i P-8A.06 has equity statements added
P-8A.06 Create and maintain comprehensive service and facility plans
consistent with the general level of service standards established in the
Comprehensive Plan and establish detailed level of service standards
which, at a minimum, meet all local, state, and federal health and safety
requirements. Establish desired level of service standards and should
include an inventory of current facilities, measurements of current and
future service capacities, the determination of future service and facility
improvements necessary to serve the twenty-year vision of the
Comprehensive Plan Land Use Map, and a financial feasibility analysis.
Include a thorough equity impact assessment to identify existing
disparities and ensure that future improvements are prioritized in ways
that advance equitable outcomes for all residents. The assessment should
be made publicly available.
i P-8A.07 has equity statements added
P-8A.07 Create and maintain comprehensive service and facility plan for
streets and non- motorized facilities (bikeways, trails, and pedestrian
walkways) that include specific actions and requirements for bringing into
compliance any street facilities that fall below the required level of service,
including demand management strategies which encourage reduced
reliance on single occupant vehicle trips and encourage use of alternate
modes of transportation such as the bicycles, walkways, and transit riding
with incentive programs for and from local businesses.
Include a future US 101 corridor to meet long- term local and regional
non-motorized transportation needs.
This plan should prioritize investments in active transportation
infrastructure in historically underserved communities to enhance
equitable access to transportation options and promote healthy lifestyles
for all residents. Incentive programs should be designed to be inclusive
and accessible to individuals from diverse socioeconomic backgrounds.
i P-8A.08 has equity statements added
P-8A.08 The City should require concurrency and standards be met at the time of
new development for the following utilities and services: The application
August 27, 2025 Planning Commission Agenda Packet 33
of these concurrency requirements should be monitored to ensure
equitable provision of services across all areas of the city, preventing the
creation or perpetuation of service disparities.
•Paved streets, curbs, and sidewalks
•Water service,
•Sanitary sewer service,
•Electrical service
•Solid waste collection,
•Stormwater management,
•Telecommunications services, and
•Emergency services (police, fire and emergency medical response).
i P-8A.09 has equity statements added
P-8A.09 Require the following services and facilities within six years from the time
of development:
•Parks and recreation services and facilities, and
•Transit system. Planning for the provision of these services should
prioritize equitable distribution and accessibility to ensure that all
residents, regardless of location or socioeconomic status, can benefit.
i P-8A.10 Minor grammar edit
P-8A.10 Adopt and maintain an annual Capital Facilities Plan consistent with the
Comprehensive Plan and State Growth Management Act. The Capital
Facilities Plan's financing schedule may be corrected, updated, or
modified without being considered as an amendment to the
Comprehensive Plan, following a public hearing before the City Council.
i P-8A.11 has equity statements added, and minor grammar edit
P-8A.11 Adopt and maintain a Comprehensive Parks and Recreation Plan
consistent with the Comprehensive Plan and the Growth Management
Act as an Element of the Comprehensive Plan. This plan should include a
detailed equity analysis of the existing parks and recreation system and
establish clear goals and strategies for achieving equitable access,
distribution, and programming that meets the diverse needs of all
community members. This includes culturally relevant programs and
accessible facilities.
i P-8A.12 has equity statements added
August 27, 2025 Planning Commission Agenda Packet 34
P-8A.12 Require sidewalks be included in all development and redevelopment
proposals where sidewalks do not exist at the time of application for
development. Permeable materials are preferred for sidewalk construction
where feasible. Prioritize the installation and improvement of sidewalks in
underserved neighborhoods with high pedestrian activity to promote
equitable access to safe and accessible pedestrian infrastructure. Explore
funding mechanisms specifically for these areas.
i P-8A.13 has equity statements added
P-8A.13 Develop and implement an Urban Forestry Program to properly manage
street trees, park trees, and forested environmentally sensitive areas
located within the city. This program should prioritize tree planting and
green space enhancement in historically disadvantaged neighborhoods
that may lack equitable access to green infrastructure. Engage residents in
these efforts.
P-8A.14 Create a unified, coherent design element for signage, street lighting,
traffic control devices, and similar structures to be used throughout the
city and specifically in the downtown area as a method for improved way
finding and place identification for visitors and residents alike.
i P-8A.15 has additions from the City.
P-8A.15 Consider efficient use of utilities, rain gardens, limited expansion of
impervious services, etc…, and adaptation strategies in planning and
designing capital facilities.
P-8A.16 Development shall be served with adequate transit service as determined
in the comprehensive service and facilities plan for transportation within
six years from the time of development.
i P-8A.17 has equity statements added
P-8A.17 Deny any development that will not be served at or greater than a
citywide level of service standard of 10 acres of parks per 1,000 population
within six years from the time of development. Ensure that the application
of this standard contributes to the equitable distribution of parkland
throughout the city, addressing historical disparities in access to green
spaces. Consider the quality and usability of parkland in addition to
acreage.
P-8A.18 Deny any development that will not be served at or less than the following
level of service standards at the time of development.
•Police 600 persons per one officer
•Fire Four-minute response time or residential sprinkler system
installationAugust 27, 2025 Planning Commission Agenda Packet 35
i P-8A.19 has equity statements added
P-8A.19 Deny any development that will not be served with solid waste collection
service at or less than a city-wide level of service standard of 400 pick-up
accounts per 1000 population within six years from the time of
development. Ensure accessibility and affordability of solid waste
collection services for all residents, including those in underserved
communities
P-8A.20 Participate with the County in the development, maintenance, and
implementation of a regional solid waste plan, which addresses collection,
disposal, and recycling of solid waste.
i P-8A.21 has equity statements added
P-8A.21 Consider the cumulative effect of development on the City's need for
adequate public service buildings. Ensure that the location and design of
public service buildings are accessible and welcoming to all members of
the community.
i P-8A.22 has equity statements added
P-8A.22 Consider projected climatic change impacts and adaptation strategies to
determine whether adequate services can be provided into the future,
prior to approving any development. Assess the disproportionate impacts
of climate change on vulnerable populations and incorporate adaptation
strategies that address these inequities.
i P-8A23 has equity statements added
P-8A.23 Support public education and Peninsula College, including initiatives for
rebuilding schools. Prioritize equitable funding and resources for all
schools and ensure that rebuilding initiatives address the needs of diverse
student populations.
i P-8A.24 has equity statements added
P-8A.24 Consider level of service standards for development based on the School
District's projected enrollment figures and residential growth as provided
for in the Land Use Element of the Comprehensive Plan: Ensure equitable
access to appropriate educational space for all students, regardless of
location or background.
August 27, 2025 Planning Commission Agenda Packet 36
•High School 125 square feet of permanent, appropriate educational
space per student
•Middle School 104 square feet of permanent, appropriate educational
space per student
•Elementary School 100 square feet of permanent, appropriate
educational space per student
City shall not approve any development that is not served with water service at or greater than the following level of service standards at the time of development.
i New Policy moved from Economic Development
NEW POLICY Take a leading role in enhancing visitors' first impression of the
community by maintaining and upgrading the City’s public facilities, green
infrastructure, and strengthen the nuisance abatement program.
i Goal 8B has equity statements added as well as comment from the City.
Goal 8B To provide urban streets and utilities at minimum levels of
service for all city residents and the general public. Emphasize
equitable access to and quality of streets and utilities for all
residents, while being mindful of affordability.
P-8B.01 All arterial streets shall function at an average daily Level of Service (LOS)
of D or better.
i P-8B.02 has equity statements added
P-8B.02 Development on all arterial streets and any other streets identified as
school walking routes should include pedestrian sidewalks on both sides
of the street. Prioritize sidewalk development in areas with high
pedestrian activity and ensure accessibility for people of all abilities.
P-8B.03 The City shall not approve any development that is not served with water
service at or greater than the following level of service standards at the
time of development:
•Single family units: 2 gallons per minute @ 30 psi
•(Fire - 1000 gallons per minute @ 20 psi for single family residential >
3,600 square feet)
•(Fire - 500 gallons per minute @ 20 psi for single family residential <
3,600 square feet)
•Multi-family units: 1 gallon per minute @ 30 psi (fire per Uniform Fire
Code)
August 27, 2025 Planning Commission Agenda Packet 37
•Commercial: per Uniform Fire Code
•Industrial: per Uniform Fire Code
P-8B.04 The City shall not approve any development that is not served with sewer
service at or greater than a level of service standard of 300 gallons per
day per person at the time of development.
P-8B.05 The City shall not approve any development that is not served with
electrical service at or greater than a level of service standard of 118 volts
(120 volt base) at the time of development.
P-8B.06 The City shall not approve any development that increases a site's post-
development stormwater run-off beyond that allowed by the Department
of Ecology Stormwater Management Manual for Western Washington as
adopted by the City.
P-8B.07 The City should not approve any development that cannot be served
with telecommunications service at or greater than the following level of
service standards at the time of development:
Telephone
Residential 1 service per unit
Commercial 1 service per business
Industrial 1 service per business
Cable Television
Residential 1 service per unit
Commercial 0 service per business
Industrial 0 service per business
Internet
Residential 1 service per unit
Commercial 0 service per business
Industrial 0 service per business
i P-8B.08 has equity statements added
August 27, 2025 Planning Commission Agenda Packet 38
P-8B.08 Highways of Statewide Significance (HSS) should function at Level of
Service (LOS) D or better, consistent with the Regional Transportation Plan
(RTP). Consider the impact of highway performance on different
communities and ensure equitable access and connectivity.
i P-8B.09 has equity statements added
P-8B.09 Develop a Capital Facilities Plan list, with public input, for prioritizing
pedestrian walkway needs. Actively seek input from diverse communities
to ensure that pedestrian walkway priorities reflect the needs of all
residents, including those with mobility challenges.
i P-8B.09 has equity statements added
P-8B.10 Seek funding to increase the provision of sidewalks in already developed
areas where sidewalks do not occur. Prioritize sidewalk improvements in
underserved areas to promote equitable pedestrian access.
Goal 8C To participate with the County, State, and Federal governments as well as other public agencies to provide
adequate regional public services such as schools, highways, tie-ins to regional communication networks,
libraries, and correctional facilities.i P-8C.01 has equity statements added
P-8C.01 The City should cooperate with the County and the community's health
care providers to ensure quality health care facilities within the City that
serve the region as a whole. Advocate for equitable access to quality
health care services for all residents, regardless of their socioeconomic
status or location.
i P-8C.02 has equity statements added
P-8C.02 The City should cooperate with the County in planning regional library
facilities within the City. Ensure that the location, hours, and resources of
regional libraries are accessible and meet the needs of diverse
communities.
i P-8C.03 has equity statements added
P-8C.03 The City should cooperate with the County in planning for adequate
correctional facilities. Advocate for fair and equitable practices within the
correctional system.
i Gaol 8D has equity statements added
Goal 8D To reduce the amount of impervious surface created by new
developments and thereby reduce stormwater management costs and
environmental impacts to the City and its natural resources, reduce
development costs to private property owners, and provide safe and
August 27, 2025 Planning Commission Agenda Packet 39
more attractive streets through traffic calming, safe pedestrian amenities,
and improved street edge landscaping. Ensure that the benefits of
reduced impervious surfaces and improved streetscapes are experienced
equitably across all neighborhoods.P-8D.01 Revise existing urban
development standards in low density residential areas to include low
impact development standards for street, pedestrian and non- motorized
access, sewer, and fire suppression to more nearly reflect the needs of
suburban densities and conditions in outlying undeveloped areas of the
City and PAUGA.
i P-8D.02 has equity statements added
P-8D.02 The City should invest in Green Infrastructure, Low Impact Development
(LID), and similar technologies to maintain and enhance environmental
quality. Prioritize green infrastructure investments in underserved areas
that may experience disproportionate environmental burdens.
i P-8D.03 has equity statements added
P-8D.03 Encourage the use of Low Impact Development stormwater management
techniques (such as vegetated roofs, permeable pavement, rainwater
harvesting, and bioretention) for all new developments. Provide resources
and incentives to ensure that LID techniques are feasible for a wide range
of developers and property owners.
Goal 8E Prepare for the increased demand for solid waste and recycling
collection and disposal.
P-8E.01 Participate with the County in the development, maintenance, and
implementation of a regional solid waste plan, which addresses collection,
disposal, and recycling of solid waste
P-3N.06 [reloc.] Encourage the City of Port Angeles to operate a composting facility.
i Goal 8F has equity statements added
Goal 8F Enhance emergency services to address response to extreme
heat, drought, flooding, sea level rise, and wildfire. Ensure that
emergency preparedness and response efforts are inclusive and
address the specific needs of vulnerable populations.
i P-8F.01 has equity statements added
August 27, 2025 Planning Commission Agenda Packet 40
P-8F.01 Develop resilience hubs — community-serving facilities augmented to
support residents. (Locate resilience hubs in accessible locations and
ensure that they offer services that meet the diverse needs of the
community.
i P-8F.02 has equity statements added
P-8F.02 Coordinate resource distribution and services before, during, and after a
hazard event ensuring equitable distribution of resources.
i P-8F.03 has equity statements added
P-8F.03 Identify safe evacuation routes for earthquakes, tsunamis, high-risk debris
flow, and landslide areas. Ensure that evacuation routes are accessible to
all residents, including those with mobility issues or limited transportation
options.
i P-8F.04 has equity statements added
P-8F.04 Improve knowledge of earthquake, tsunami, landslide hazard areas and
understanding of vulnerability and risk to life and property in hazard-prone
areas. Conduct outreach and education in multiple languages and
formats to ensure that all residents understand the risks.
i P-8F.05 has equity statements added
P-8F.05 Evaluate current earthquake, tsunami, and landslide warning systems to
ensure effectiveness and efficiency and increase coordination between
local jurisdictions. Ensure that warning systems are accessible to all
residents, including those with sensory impairments.
P-8F.06 Strengthen response to earthquakes, tsunamis, and landslides by incident
management teams to increase resilience.
i P-8F.07 has equity statements added
P-8F.07 Create a Community Wildfire Preparedness Plan that engages diverse
community members in the development of the preparedness plan to
ensure it addresses the needs of all residents
i P-8F.08 has equity statements added
P-8F.08 Provide education and outreach to residents to ensure their personal
preparedness in the event of wildfire. Offer educational materials in
multiple languages and formats and conduct outreach to underserved
communities.
August 27, 2025 Planning Commission Agenda Packet 41
i P-8F.09 has equity statements added
P-8F.09 Enhance Emergency Services to increase efficiency of wildfire response
and recovery activities. Ensure that wildfire response and recovery efforts
address the needs of all affected residents equitably.
i P-8F.10 has equity statements added
P-8F.10 Complete a new wildfire assessment that accounts for Wildland Urban
Interface areas. Consider the socioeconomic characteristics of Wildland
Urban Interface areas and potential disparities in wildfire risk and
resilience.
i P-8F.11 has equity statements added
P-8F.11 Develop and disseminate maps relating to the fire hazard to help educate
and assist builders and homeowners engaged in wildfire mitigation
activities, and to help guide emergency services during response. Ensure
that maps and related information are accessible and understandable to
all residents.
i P-8F.12 has equity statements added
P-8F.12 Improve brush clean-up operations to decrease wildfire fuel. Ensure that
brush clean-up programs are implemented equitably across all
neighborhoods.
P-8F.13 Improve current emergency evacuation routes. Site new emergency
evacuation routes to increase route redundancy in case the primary
emergency evacuation route is affected by the emergency.
Goal 8G Increase municipal cleanup and refuse capacity to prepare for
increased need following extreme precipitation events.
P-8G.01 Develop and implement a strategy to expedite the removal of waste (e.g.,
downed tree limbs and buildings blocking roads and streams) during and
after a disaster incident to reduce the risks of subsequent fire, flood,
injury, and disease vectors.
Goal 8H Reduce waste-related greenhouse gas emissions from
wastewater and landfills.
P-8H.01 Evaluate wastewater facility to reduce greenhouse emissions and build
resilience to climate impacts such as landslides.
August 27, 2025 Planning Commission Agenda Packet 42
P-8H.02 Maximize the co-generation and on-site utilization of natural gas from
anaerobic digesters and other methods of harnessing energy in
wastewater treatment. This will reduce vulnerability to power and fuel
shortages, as well as reduce emissions.
P-8H.03 Reduce vulnerability of access routes to the treatment plant and consider
identifying alternative routes should primary routes be compromised.
Goal 8I Prepare conservation strategies and protect water quality to
increase resilience to drought, sea level rise, and reduced
snowpack.
i P-8I.01 has equity statements added
P-8I.01 Enhance water supply monitoring to increase resilience during drought
periods. Ensure that monitoring data is used to inform equitable water
management decisions.
i P-8I.02 has equity statements added
P-8I.02 Reduce water consumption through education and incentive programs.
For example:
•Create a smart grid water use system and share data with consumers
•to increase conservation. Ensure that smart grid technology and data
sharing are accessible to all residents.
•Promote and incentivize smart irrigation technologies for golf courses
•and parks.
•Update water rates to discourage watering lawns. Analyze the potential
impact of rate changes on low-income households and consider
implementing tiered rates or assistance programs
•Provide incentives for efficient food cultivation.
i P-8I.03 has equity statements added
P-8I.03 Maintain and enhance the quality of water resources through the
regulation of clearing, grading, dumping, discharging, and draining and
the provision of flood and erosion control measures and regulations to
protect wetlands and other environmentally sensitive areas. Use adaptive
management practices and best available climate science and projections
to inform these efforts. Ensure that regulations and control measures are
applied equitably and that the benefits of environmental protection are
shared by all communities.
August 27, 2025 Planning Commission Agenda Packet 43
Utilities & Public Services
Element
August 27, 2025 Planning Commission Agenda Packet 44
Introduction
i Replaced introduction with updated text
The Utilities Element serves as a required critical framework to detail the
location and capacity of existing and proposed utilities such as electricity
and telecommunications. Beyond a simple inventory, the GMA also
mandates that the Utilities Element contain recommendations for meeting
future utility needs, based on projected population and economic growth.
This necessitates a collaborative approach, requiring consultation with
Bonneville Power Administration and consideration of their plans and
forecasts. By addressing these requirements, the Utilities Element ensures
that adequate infrastructure is strategically planned and available to
support development, without compromising existing service levels.
As a full-service City, the city of Port Angeles provides the community
with electricity, garbage collection, recycling and yard waste collection,
water, wastewater (sewer), and stormwater services at competitive rates
and in compliance with all state and federal standards. Those City
provided utilities are outlined in the Capital Facilities Element (8). While
the city directly manages these core utilities, other essential services are
provided by alternative providers operating within the area.
Service Type Residential Commercial Industrial
Telephone 1 service per unit 1 service per business 1 service per business
Cable Television 1 service per unit 0 service per business 0 service per business
Internet 1 service per unit 0 service per business 0 service per business
August 27, 2025 Planning Commission Agenda Packet 45
i New text with updated information
Telecommunications
Port Angeles residents and businesses benefit from a diverse range of
telecommunication services. High-speed internet options include fiber
optic from CenturyLink and Astound Broadband, with varying availability.
Cable internet is also provided by Astound Broadband and CenturyLink,
while DSL is available through CenturyLink and AT&T. For wireless
connectivity, fixed wireless services are offered by Nikola Broadband,
CresComm Broadband, and the 5G home internet options from T-Mobile
and Verizon. Satellite internet, ensuring wide coverage, is available from
Viasat, HughesNet, and Starlink. The Clallam County PUD's fiber network
supports services from providers. Landline phone services are accessible
through traditional providers like CenturyLink, as well as local provider
Angeles Communications. Mobile phone service is readily available from
major carriers like AT&T and Verizon.
August 27, 2025 Planning Commission Agenda Packet 46
Goals and Policies
i Goal 5A Grammar update
Goal 5A To ensure access or allow the opportunity for
services and facilities which enhance the quality of
life for Port Angeles citizens of all ages,
characteristics, needs, and interests and to achieve
the desired urban design of the City.
P-5A.01 Include provisions in public facilities for citizens with
disabilities and construct them according to accepted
standards.
P-5A.02 Locate social services providing home care in residential
neighborhoods in a manner that maintains the character
of the immediate neighborhood.
P-5A.03 Comprehensive service and facility plans should be
consistent with the City's Comprehensive Plan and should
be implemented through applicable land use approvals
and construction permits.
i P-5A.04 Revised text by the City
P-5A.04 City projects shall consider various ages, characteristics,
needs, and interests while being mindful of tribal issues
and other community interests.
Goal 5B To support services and facilities through different
levels of participation in cooperation with other
public or private agencies.
i P-5B.01 Updates per the City
P-5B.01 The City should be the "primary responsible agency" and
should take the lead in cooperation with other
governmental entities to provide:
•Utility and emergency services (water, wastewater,
electrical, stormwater, police, fire, solid waste and
emergency medical response services)
August 27, 2025 Planning Commission Agenda Packet 47
• Transportation infrastructure, including trails and
sidewalks and
• Parks and recreation
i P-5B.02 has equity statements added
P-5B.02 The City should participate as a "financial partner" to
support essential programs and services including:
• accessibility for youth from diverse socioeconomic
backgrounds.
• Library facilities, ensuring equitable access for
individuals with varying needs and from diverse
backgrounds.
• Senior programs, ensuring culturally relevant and
accessible programs for a diverse senior population.
• Low- and moderate-income housing programs
• Facilities for senior programs, ensuring accessible and
culturally appropriate facilities.
• Utility assistance for low-income households,
andSocial and public health services, addressing health
disparities and ensuring culturally competent services.
i P-5B.03 has equity statements added
P-5B.03 As a "supporter," the City should promote and cooperate
in providing programs and services including:
Library programs such as information and assistance,
ensuring services are accessible and relevant to diverse
community members.
• Affordable housing information and referral, ensuring
information is accessible in multiple languages and
formats.
• Economic and business development services,
supporting equitable opportunities for businesses
owned by underrepresented groups.
• Tourism information and services, promoting inclusive
tourism that benefits all community members.
• Schools and community learning, supporting equitable
access to quality education and learning opportunities
for all.
• Fine arts, promoting diverse artistic expressions and
ensuring equitable access to arts and culture.
August 27, 2025 Planning Commission Agenda Packet 48
• Community recreation, ensuring affordable, accessible,
and culturally relevant recreational opportunities for all.
• Public and private youth, family and senior services,
ensuring culturally competent and accessible services
that meet the diverse needs of these groups.
• Telecommunications, promoting equitable access to
broadband and technology for all residents.
• Crime prevention programs, ensuring fair and
equitable approaches to crime prevention and
addressing systemic inequities.
• Health Care programs, promoting equitable access to
quality and culturally competent healthcare.
•
i P-5B.04 has equity statements added
P-5B.04 Develop and use public facilities cooperatively, in the
promotion of social and community services, ensuring
these cooperatively used facilities are accessible and
welcoming to all members of the community.
Goal 5C To provide safe, clean, usable, and attractive public
facilities which enhance the cultural, educational,
economic, recreational, and environmental
attributes of the City.
i P-5C.01 has equity statements added
P-5C.01 Support industrial diversification by the development of
urban services, ensuring equitable opportunities in new
industrial sectors for all residents.
i P-5C.02 has equity statements added
P-5C.02 Major parks and large open spaces should provide for a
variety of outdoor activities and be located to take
advantage of natural processes (such as wetlands and tidal
actions) and unusual landscape features (such as cliffs and
bluffs), and to integrate stormwater facilities into the
natural landscape where feasible (such as LID techniques
and BMPs and stormwater treatment wetlands), ensuring
equitable access to these diverse park experiences for all
residents, regardless of location or ability.
August 27, 2025 Planning Commission Agenda Packet 49
i P-5C.03 has equity statements added
P-5C.03 Provide a variety of settings and activities suitable to
people of all ages, characteristics, and interests, explicitly
mentioning equitable access and culturally relevant
options.
i P-5C.04 has equity statements added
P-5C.04 Encourage more active involvement and communication
between education (professional and student), business,
community, art and cultural communities to help integrate
key people into the startup community, ensuring
opportunities for participation from underrepresented
groups in these sectors.
i P-5C.05 has equity statements added
P-5C.05 Work in partnership with the community as stewards of
the area’s unique environment and quality of life, ensuring
inclusive engagement of diverse community members in
environmental stewardship efforts.
Goal 5D To provide utility services in an efficient and cost-
effective manner.
P-5D.01 Design urban services for the maximum planned density
and/or land use intensity of a given area as designated on
the Comprehensive Plan Land Use Map.
P-5D.02 Provide urban services only in areas that are logical
extensions of areas, which are currently served by such
services or needed to implement a specific goal or policy
of the Comprehensive Plan.
i P-5D.03 has equity statements added
P-5D.03 Promote and encourage energy conservation, renewable
energy, distributed energy generation, improved
distribution efficiencies, and recycling efforts throughout
the community, ensuring equitable access to energy
efficiency programs and renewable energy options,
particularly for low-income residents.
August 27, 2025 Planning Commission Agenda Packet 50
i P-5D.04 has equity statements added
P-5D.04 Promote the joint use of transportation rights-of-way and
utility corridors for all forms of transportation, including
non-motorized, ensuring these shared corridors are
designed to be safe and accessible for all users, including
those with disabilities.
i P-7D-06 Relocated from Conservation
P-7D.06 [reloc.] Utilize common utility corridors for urban service facilities
located in shoreline areas.
P-5D.05 Promote coordination, consistency, and concurrency at all
stages of utility development in the Port Angeles Urban
Growth Area.
P-5D.06 Planning for utility services should be consistent with the
goals and policies of the Capital Facilities Element.
P-5D.07 Serve new development with sanitary sewers.
P-5D.08 Consider the policies adopted in the Water Resources
Inventory Area 18 Watershed Management Plan, including
the provision of water supply to the urban areas in and
between the Elwha River and Morse Creek drainage
basins.
i P-5D.09 has equity statements added
P-5D.09 Provide infrastructure to all industrial lands to encourage
development, ensuring equitable access to job
opportunities created by this development for all residents.
i P-5D.10 has equity statements added
P-5D.10 Encourage the use of renewable energy in both the
private and public sectors, providing all reasonable
support and advocacy at the State level for regulations
and incentives that encourage such installations, ensuring
that renewable energy incentives are accessible to a wide
range of residents and businesses, including those with
lower incomes.
August 27, 2025 Planning Commission Agenda Packet 51
Goal 5E To build resilience and capacity to prepare for
increased energy demand by enhancing energy
and resource efficiency and diversifying the grid.
P-5E.01 Continue working with Bonneville Power Administration to
provide incentives and education for residents to conserve
energy, access renewable energy, and finance energy
efficiency retrofits.
P-5E.02 Incentivize active and passive solar building design and
leverage existing Bonneville Power Administration
programs (e.g., energy efficiency incentives) and state and
federal funding sources and policy.
i Adding from Conservation Element
P-7B-19 [reloc.] Promote the use of alternative energy, energy
conservation technology, and smart energy grid.
Goal G-5F Enhance emergency services to address response
to extreme heat, drought, flooding, sea level rise,
and wildfire.
i P-5F.01 has equity statements added
P-5F.01 Identify safe evacuation routes for earthquakes, tsunamis,
high-risk debris flow, and landslide areas, ensuring these
routes are accessible to individuals with mobility
challenges and that communication about them reaches
all residents, including those with language barriers.
i P-5F.02 has equity statements added
P-5F.02 Improve knowledge and strengthen response to
earthquakes, tsunamis, and landslide hazard areas and
increase understanding of vulnerability and risk to life and
property in hazard-prone areas, ensuring this information
is accessible to all residents, including those with language
barriers or limited access to technology.
i P-5F.03 has equity statements added
P-5F.03 Evaluate current earthquake, tsunami, and landslide
warning systems to ensure effectiveness and efficiency and
August 27, 2025 Planning Commission Agenda Packet 52
increase coordination between local jurisdictions, ensuring
warning systems reach all residents effectively, including
those without internet access or who speak languages
other than English.
i P-5F.04 has equity statements added
P-5F.04 Strengthen response to earthquakes, tsunamis, and
landslides by incident management teams to increase
resilience, ensuring that response efforts are equitable and
address the diverse needs of the affected population.
i P-5F.05 has equity statements added
P-5F.05 Create a Community Wildfire Preparedness Plan, ensuring
inclusive community engagement in the development of
this plan.
i P-5F.06 has equity statements added
P-5F.06 Provide education and outreach to residents to ensure
their personal preparedness in the event of a wildfire,
ensuring outreach is accessible and culturally relevant to
all residents, including those with language barriers or
limited access to information.
i P-5F.07 has equity statements added
P-5F.07 Enhance Emergency Services to increase efficiency of
wildfire response and recovery activities, ensuring
equitable resource allocation and support during response
and recovery.
i P-5F.08 has equity statements added
P-5F.08 Complete a new wildfire assessment that accounts for
Wildland Urban Interface areas, considering the
disproportionate impacts of wildfire on vulnerable
populations.
i P-5F.09 has equity statements added
P-5F.09 Develop and disseminate maps relating to the fire hazard
to help educate and assist builders and homeowners
engaged in wildfire mitigation activities, and to help guide
August 27, 2025 Planning Commission Agenda Packet 53
emergency services during response, ensuring these maps
and information are accessible to all residents, regardless
of their housing situation or access to technology.
i P-5F.10 has equity statements added
P-5F.10 Improve brush clean-up operations to decrease wildfire
fuel, ensuring these operations are conducted equitably
and do not disproportionately impact vulnerable
populations.
i P-5F.11 has equity statements added
P-5F.11 Improve current emergency evacuation routes. Site new
emergency evacuation routes to increase route
redundancy in case the primary emergency evacuation
route is affected by the emergency, ensuring these routes
are accessible to individuals with mobility challenges and
that information about them is widely disseminated.
P-3E.07 [reloc.] Encourage new residential development to promote
resilience by incorporating underground utilities.
Goal 5G Prepare conservation strategies and protect water
quality to increase resilience to drought, sea level
rise, and reduced snowpack.
P-5G.01 Enhance water supply monitoring to increase resilience
during drought periods.
i P-5G.02 has equity statements added
•P-5G.02 Reduce water consumption through
education and incentive programs, ensuring these
programs are accessible and beneficial to all residents,
including low-income households.For example:
•Create a smart grid water use system and share data
with consumers to increase conservation, ensuring
access to this technology for all residents. Promote
and incentivize smart irrigation technologies for golf
coursesand parks.
•Update water rates to discourage watering lawns.
Provide incentives for efficient food
cultivation, ensuring these incentives
August 27, 2025 Planning Commission Agenda Packet 54
are accessible to diverse community
members. i P-5G.03 has equity statements added
1. P-5G.03 Maintain and enhance the quality of water
resources through the regulation of clearing, grading, dumping,
discharging, and draining and the provision of flood and erosion
control measures and regulations to protect wetlands and other
environmentally sensitive areas. Use adaptive management
practices and best available climate science and projections to
inform these efforts, ensuring that the benefits of these
protections are equitably distributed and that potential negative
impacts on vulnerable populations are addressed. s.
August 27, 2025 Planning Commission Agenda Packet 55
August 27, 2025 Planning Commission Agenda Packet 56
TABLE OF CONTENTS
Thank You ............................................................................................................................................................ 4
Land Acknowledgement ...................................................................................................................................... 5
Executive Summary ............................................................................................................................................. 6
Housing Action background: Defining the Challenge ........................................................................................ 8
How Port Angeles Plans for Future Housing Needs ....................................................................................... 10
Housing Needs Assessment Summary ........................................................................................................... 12
Project Goals ...................................................................................................................................................... 19
Public Engagement ............................................................................................................................................ 19
Housing Development Strategies ..................................................................................................................... 20
Implementation Schedule ................................................................................................................................. 33
Appendix A: Housing Policy Analysis goals from the 2019 HAP.................................................................... 36
Appendix B: Housing Needs Assessment ........................................................................................................ 43
Appendix C: Land Capacity Analysis Map ........................................................................................................ 44
Appendix D: Port Angeles Housing Cost Burden Charts ................................................................................. 46
TABLES AND FIGURES
Table 1: ................................................................................................................................................................ 11
Figure 1: .............................................................................................................................................................. 10
Figure 2: ............................................................................................................................................................... 13
Figure 3: ............................................................................................................................................................... 14
Figure 4: ............................................................................................................................................................... 15
Figure 5: ............................................................................................................................................................... 16
Figure 6: ............................................................................................................................................................... 17
Figure 7: ............................................................................................................................................................... 17
Figure 8: ............................................................................................................................................................... 20
Figure 9: ............................................................................................................................................................... 21
Figure 10: ............................................................................................................................................................. 22
Figure 11: ............................................................................................................................................................. 23
Figure 12: ............................................................................................................................................................. 25
Figure 13: ............................................................................................................................................................. 26
Figure 14: ............................................................................................................................................................. 27
Figure 15: ............................................................................................................................................................. 28
Figure 16: ............................................................................................................................................................. 29
August 27, 2025 Planning Commission Agenda Packet 57
Figure 17: ............................................................................................................................................................. 30
Figure 18: ............................................................................................................................................................. 31
August 27, 2025 Planning Commission Agenda Packet 58
THANK YOU
CITY COUNCIL
Mayor Kate Dexter
Deputy Mayor Navarra Carr
Councilmember Brendan Meyer
Councilmember Amy Miller
Councilmember Lindsey Schromen-Wawrin
Councilmember Drew Schwab
Councilmember LaTrisha Suggs
PLANNING COMMISSION
Chair Colin Young
Vice Chair Daniel Steiger
Commissioner Dallas Kiedrowski
Commissioner Walker Mellema
Commissioner Anna Schorr
Commissioner Sherne-Marie McMillan
Commissioner Ben Stanley
CITY STAFF
Nathan A. West, City Manager
Calvin W. Goings, Deputy City Manager
Shannen C. Cartmel, Community and Economic Development Manager
Benjamin G.L. Braudrick, Planning Supervisor
Jalyn C. Boado, Housing Administrator
August 27, 2025 Planning Commission Agenda Packet 59
LAND ACKNOWLEDGEMENT
The City of Port Angeles acknowledges the Coast Salish peoples of this land, the land which touches
the shared waters of all tribes and bands within the Lower Elwha Klallam, Jamestown S’Klallam, Port
Gamble S’Klallam, Skokomish, Quinault, Hoh, Quileute, and Makah nations.
August 27, 2025 Planning Commission Agenda Packet 60
EXECUTIVE SUMMARY
The City of Port Angeles 2025 Housing Action Plan (HAP) is an updated strategy building on the
2019 plan to tackle critical housing challenges and promote a fair, diverse, and sustainable housing
future. With housing affordability and accessibility emerging as key issues in Washington State, Port
Angeles faces unique challenges, such as geographic constraints, aging infrastructure, and limited
land development capacity.
Defining the Challenge
Port Angeles, once sustained by robust forestry and maritime industries, has experienced significant
economic transitions in recent decades. The decline of its traditional industries has given rise to a
tourism-based economy, characterized by lower-wage jobs and increased difficulty for local workers
to secure affordable housing. Major employers, including the Coast Guard, Olympic National Park,
and regional healthcare systems, report challenges in recruiting and retaining staff due to housing
shortages and low vacancy rates.
Several systemic and geographic barriers exacerbate these issues:
o Geographic Isolation: Surrounded by natural barriers—the Strait of Juan de Fuca, Olympic
Mountains, and major waterways—Port Angeles has limited available land for development
compared to other regional cities.
o Aging Infrastructure: Several of the City’s wastewater and stormwater basins lack capacity
to support higher-density housing.
o Historic Development Patterns: Outdated zoning and land use decisions have resulted in
large-lot single-family housing that limits infill and density.
o Aging Housing Stock: The median home in Port Angeles was built in 1962, and more than
half of the city’s housing units are over 50 years old. Renovating or redeveloping these
homes often proves cost-prohibitive due to updated building and energy codes.
o Limited Workforce and Resources: The city’s distance from the Puget Sound metropolitan
area complicates access to skilled labor, materials, and larger-scale developers.
These challenges have contributed to severe housing affordability issues. Nearly 50% of households
are classified as low-income, and 38% are cost-burdened, spending more than 30% of their income
on housing. Among renters, 68% are low-income, with many facing significant housing insecurity.
Homelessness in Clallam County reached its highest level in a decade in 2024, doubling from the
previous year.
Progress Since 2019
Since adopting its first Housing Action Plan, the City has made measurable strides to mitigate these
barriers:
o Permit Fee Waiver Program: Implemented in 2023, waiving 25 building and land use permit
fees for affordable, infill, and multifamily housing projects.
o Permit-Ready Plans: Developed a library of pre-approved designs for small-lot homes and
townhouses, expediting permitting and lowering development costs.
August 27, 2025 Planning Commission Agenda Packet 61
o Housing Pipeline Pilot Project: Acquired property at 935 W 10th Street to catalyze affordable,
high-density development and demonstrate innovative approaches to multifamily housing.
o Zoning Reforms: Updated municipal code to encourage diverse housing types, including
Accessory Dwelling Units (ADUs), co-living arrangements, and higher-density developments.
o Multifamily Property Tax Exemption (MFTE): Continued operation and alignment with recent
state legislation to incentivize affordable multifamily construction.
These actions represent important steps toward increasing housing options and affordability,
though continued and expanded efforts are required to meet community needs.
Strategic Recommendations
To achieve these goals, the Plan outlines actionable strategies across six focus areas:
1. Increase Housing Supply and Variety: Expand initiatives like the Housing Pipeline Project,
co-living code updates, and workshops for multifamily builders. Encourage infill development
through continued zoning and permitting reforms.
2. Improve Affordability: Leverage the Affordable Housing Sales and Use Tax to fund projects
for residents earning at or below 60% of Area Median Income (AMI). Continue the MFTE
program with enhanced anti-displacement safeguards.
3. Preserve Existing Housing: Continue programs like the COPA Weatherization Program and
enforce blighted property reduction strategies to address vacant or unfit buildings.
4. Promote Homeownership: Explore down payment assistance programs in partnership with
local financial institutions and community organizations to support first-time buyers.
5. Address Homelessness: Create a City-wide Homelessness Navigator position to coordinate
services, bridge gaps, and connect residents with resources.
6. Prevent Displacement: Consider policies and incentives to empower tenants and nonprofit
organizations to preserve affordable housing stock.
Implementation and Next Steps
The Plan includes a detailed schedule of programs and actions, assigning responsibilities to City
departments, partners, and stakeholders. Progress will be monitored through periodic assessments
to ensure alignment with housing targets and community goals.
This Plan provides a framework for creating a diverse, inclusive, and sustainable housing
environment where all residents—regardless of income—can find a safe, affordable place to call
home.
August 27, 2025 Planning Commission Agenda Packet 62
HOUSING ACTION BACKGROUND: DEFINING THE CHALLENGE
Constructing housing in Port Angeles has presented various challenges throughout the City’s history,
some more difficult than others. The city experienced steady and healthy growth from the 1920s to
the 1970s, largely due to the success of its forestry and maritime industries, its designation as the
county seat, and its role as host to an international ferry service to Victoria, British Columbia, as well
as the headquarters of Olympic National Park. For most of the twentieth century, large lumber, pulp,
paper, and plywood mills along the city’s waterfront and the Port’s piers and marina drove the local
economy. Those industries that supported past generations have diminished, and stagnation in the
construction industry has followed suit. In the 21st Century, the economy has begun to diversify, and
tourism has become an increasingly more prevalent economic sector for Port Angeles.
Finding and securing affordable and attainable housing for working families remains a significant
issue, as lower-wage tourism jobs have become more common since the closure of the local mills.
Major public institutions, such as the Coast Guard, the National Park Service, the National Forest
Service, Olympic Medical Center, and the Port Angeles School District, all struggle to house their
employees within the City. In many cases, recruiting new employees is challenging, particularly due
to low housing vacancy rates. That low vacancy rate creates operational gaps that reduce the
services Clallam County public institutions and local private businesses can provide.
Port Angeles faces several distinct barriers to new construction, rehabilitation of aging housing, and
accommodating increased density and growth:
1. Port Angeles has island-like physical barriers.
As Port Angeles has grown, expanded, and developed over the last 50 years, it has had to navigate
several physical barriers. The city limits feature five small stream corridors: the boundaries of Morse
Creek to the east, the Elwha River to the west, the shoreline of the Strait of Juan de Fuca to the north,
and the Olympic Mountain range to the south. These geographic characteristics make housing
development more challenging than in surrounding cities, which have fewer natural barriers to
growth and greater available undeveloped land capacity.
2. Port Angeles is held to higher infrastructure standards and suffers from a lack of physical
capacity.
Port Angeles faces several additional challenges, with the greatest of which is wastewater capacity
due to several basins with a combined sewer/stormwater system. The aging areas of the system are
sized in a manner that does not account for additional stormwater runoff from on-site impervious
surfaces, such as structures, detached garages, and driveways. Certain neighborhoods that are
“upstream” of these capacity pinch points may require more than just an increase in wastewater
pipe size. The Port Angeles urban growth area is the only location on the Olympic Peninsula that
holds a National Pollution Discharge Elimination System Phase II permit and is therefore subject to
higher standards to address minimum control measures set by the Federal Environmental Protection
Agency. These standards, combined with a sewer system that has capacity issues, can make
constructing housing of any kind more cost prohibitive.
August 27, 2025 Planning Commission Agenda Packet 63
3. Historic development has long-lasting negative effects on future development.
The federal government originally platted Port Angeles as a townsite with 7,000-square-foot lots and
a gridiron configuration that did not account for the coast and natural geography. The western area
of the City remained undeveloped until the 1970s, when larger lot development with curvilinear
streets and cul-de-sacs, which lacked alleyways, was seen as a more attractive development pattern.
Single-occupancy vehicle-oriented transportation and heavily segregated residential and commercial
development were also the standard for mid-sized municipalities at the time. A more traditional
complete streetscape and local access to commercial services, which were more prevalent prior to
World War II, were replaced by large lot monocultural detached single-family house units in zoning
that did not foresee the challenges Port Angeles is facing today.
4. Port Angeles housing is generally aging and fails to meet state and federal building standards.
The median age of all housing units constructed in Port Angeles is over 60 years old, and the
average house was built in 1962, which is comparatively older than those in surrounding North
Olympic Peninsula communities and statewide trends. Remodeling and rehabilitating older homes,
especially those that have been vacant for an extended period, becomes increasingly challenging
over time. Periodic updates to the Washington State Building and Energy codes must be met during
these updates, making the ability to rent or sell a second rehabilitated home cost-prohibitive without
the renter or buyer becoming cost-burdened by the rental or mortgage rate.
5. Port Angeles is a ferry ride and a floating bridge from the Puget Sound Metropolitan Area
The I-5 corridor is a minimum two-hour drive distant, which complicates the procurement of building
materials and skilled workers in the fields of engineering and architectural services, as well as skilled
builders with the necessary expertise in trades required to construct larger multifamily apartment
buildings. The return on investment for those interested in developing middle and multifamily
housing without public sector assistance is greater in the I-5 corridor. Although Port Angeles has led
the way for zoning and building allowances and housing programs in Washington State for mid-
sized cities, competing with access to skilled work and services, materials, and financial assistance
continues to be a significant barrier.
6. Port Angeles acts as its own independent utility
Port Angeles taxpayers are responsible for all local infrastructure maintenance and improvements,
facilities, and public services, including water, power, transportation, wastewater collection and
treatment, parks, fire, and police. With a 2025 OFM projected population of 20,240, Port Angeles
must see growth in its tax base before the municipality can properly maintain all the existing
infrastructure in its Urban Growth Area. Maintaining existing facilities–and expanding new ones–
requires proper planning practices, prioritized development and assessments, and fiscal
responsibility. Although there is potential land capacity for development in the unincorporated urban
growth area, it comes at a significant cost in terms of upgrading the city’s already constrained
infrastructure and city services. The city's wastewater treatment plant is projected to have adequate
capacity until at least 2030, designed to serve a population of 24,800.
August 27, 2025 Planning Commission Agenda Packet 64
HOW PORT ANGELES PLANS FOR FUTURE HOUSING NEEDS
With these geographic and systemic barriers to housing development, the City of Port Angeles
remains committed to exploring every approach to encourage the development of affordable and
diverse housing by reducing regulatory barriers in its zoning code. City staff developed and sent out
a housing needs assessment survey to the greater Port
Angeles community to assess community-wide opinions on
current housing conditions, preferences, and priorities, and
received over 580 responses. The 2019 Housing Action Plan
(HAP) clarified population and housing projections,
analyzed housing market trends, outlined the existing
housing stock, and established goals and policies.
This updated 2025 HAP serves as the periodic update of the
Housing Action Plan (HAP), providing a comprehensive
evaluation of progress made from 2019 to 2025. The HAP
takes the data from the Housing Needs Assessment (HNA)
and the goals and policies outlined in the Housing Element
of the comprehensive plan and lays out tangible
implementation steps.
The HAP update aims to achieve several key objectives:
• Summarize and Contextualize Key Findings: This section will distill and clarify the major
insights derived from the Housing Needs Assessment (HNA), offering a thorough understanding
of the current housing landscape (refer to the Appendix B for detailed findings).
• Identify Growth Targets and Population Trends: The HNA will project the growth targets and
demographic shifts anticipated for the City of Port Angeles over the next decade, providing
critical context for future housing development.
• Outline Housing Goals for the City: Drawing on extensive feedback from the Port Angeles City
Council, the Stakeholder Advisory Committee, and community members gathered through public
engagement sessions, we will define specific housing goals aimed at addressing local needs.
• Evaluate Progress on 2019 HAP Goals: A thorough assessment will be conducted to measure
the effectiveness and progress toward achieving the goals initially outlined in the 2019 HAP.
• Review Current Affordable Housing Projects: This section will provide an in-depth overview of
the City’s existing affordable housing initiatives, assessing their impact and effectiveness in
meeting community needs.
In addition, the update will present a series of recommendations for the development of robust
housing strategies, which include:
• Strategies to Increase Housing Supply: Crafting actionable plans to expand the overall
availability of housing in the area.
• Strategies to Diversify Housing Types: Proposing a wider array of housing options, ensuring
that various needs and preferences within the community are met.
• Strategies for Housing Affordability: Focusing on measures that will make housing
accessible and affordable for individuals and families across all income levels.
Figure 1: Comprehensive Plan Graphic
August 27, 2025 Planning Commission Agenda Packet 65
• Strategies to Minimize Displacement: Developing approaches to protect low-income
residents from being displaced due to redevelopment, ensuring that vulnerable populations
are supported.
• Strategies to Support Housing Preservation: Emphasizing the importance of maintaining
and improving existing housing stock to protect community character and affordability.
• Consider Broader Economic Context: Evaluating how housing strategies can contribute to
mitigating economic displacement pressures, creating a stable and supportive environment
for all residents.
What is affordable housing?
The Department of Housing and Urban Development (HUD) establishes income limits to determine
eligibility for assisted housing programs. These income limits are based on estimates of Median
Family Income and the definitions of Fair Market Rent for each metropolitan area, specific parts of
some urban areas, and all non-urban counties (HUD Office of Policy Development and Research). In
the City of Port Angeles and Clallam County, affordable housing is defined as households with
incomes at or below 80% of the area median income (AMI). The HUD-determined AMI income limits
change annually and vary with household size (see Table 1).
Persons in Family
Income Level 1 2 3 4 5 6 7 8
Extremely Low Income
(30% AMI) $19,950 $22,800 $26,650 $32,150 $37,650 $43,150 $48,650 $54,150
Very Low Income (50%
AMI) $33,200 $37,950 $42,700 $47,400 $51,200 $55,000 $58,800 $62,600
Low Income
(80% AMI) $53,100 $60,700 $68,300 $75,850 $81,950 $88,000 $94,100 $100,150
Source: U.S. Department of Housing and Urban Development (HUD).
Table 1. HUD Income Limits for Clallam County, 2025
August 27, 2025 Planning Commission Agenda Packet 66
HOUSING NEEDS ASSESSMENT SUMMARY
The following is a summary of the Housing Needs Assessment (HNA). This Housing Needs
Assessment (HNA) is prepared as part of the periodic update of the Comprehensive Plan’s
background analysis required by the State Growth Management Act (GMA) under RCW 36.70A.130.
This report identifies current and future housing needs to serve all income demographics within the
community and analyzes potential gaps in housing supply, types, and affordability.
The complete Housing Needs Assessment can be found in Appendix B to this Plan.
COMMUNITY PROFILE
•The Port Angeles population has grown slowly since 1980, with an annual growth of less than
one percent. This is a slower growth rate than that of Clallam County and significantly slower
than the state's population growth. It is estimated that in 2024, the population of Port Angeles
was 20,410.
•The average age in 2022 is 41.3 years in Port Angeles, which is younger than the county's
average age but older than the state's average.
•Port Angeles has relatively homogeneous racial diversity, with 80 percent of the population
identified as white. Overall, the city’s population diversity is similar to Clallam County and less
diverse compared to the state as a whole.
•The average household size in Port Angeles is 2.2, which is approximately the same as the
county average and smaller than the 2022 statewide average of 2.5. However, the state has a
higher proportion of family households and children compared to Port Angeles and Clallam
County.
•More than 50 percent of households own their homes, and homeowners earn more than twice as
much as renter households in the city.
•Nearly half of Port Angeles households are classified as low-income, earning less than 80% of
the Area Median Income. Among renters, 68 percent of households are classified as low-income.
•About 38 percent of households are cost-burdened, spending more than 30 percent of their
income on housing costs, with renters and lower-income households facing high levels of cost-
burden.
•In 2024, homelessness in Clallam County has reached its highest rate in the last decade. The
number of unsheltered individuals has doubled since 2023.
•In 2020, more than half of elderly family households were low-income, and 35 percent of all
senior-headed households consisted of seniors living alone and facing cost burdens.
•2,840 households have a member with a disability, and most of them are low-income
households.
August 27, 2025 Planning Commission Agenda Packet 67
Figure 2 illustrates the historic population growth in Port Angeles from 1960 and projected to 2045.
Each year the Washington State Office of Financial Management works with local jurisdictions to
conduct a census or collect data to do a population estimate. The black throughline represents the
annual growth rate where population growth has decreased and stagnated between 1980 and 2020.
Looking forward to 2045 the annual growth rate is expected to increase.
WORKFORCE PROFILE
• In 2021, there were 9,102 jobs in Port Angeles. The Health Care and Social Assistance sector
has dominated and experienced rapid growth since 2011. This is also a top industry in
Clallam County. The average wage in the industry is comparable to the county's average.
Other key job sectors are Accommodation and Food Services, Education, Retail, Public
Administration, and Manufacturing.
• Port Angeles has a similar number of commuters both entering and leaving the city, with 39
percent of workers residing in Port Angeles. The patterns of commuting out are diverse, with
Seattle and various smaller locations serving as job destinations.
• Port Angeles has a balanced employment-to-housing ratio, at 0.9.
• The Education and Health Care sector is projected to grow by 1.3 percent in the Olympic
Workforce Development Area. Meanwhile, Leisure and Hospitality is expected to be the
fastest-growing sector, with an annual growth rate of 2.1 percent
Figure 2. Historic Population Growth in Port Angeles, 1960–2024
Source: U.S. Census Bureau Decennial Census, Washington Office of Financial Management (OFM) Historic Population
Data and April 1 Population Estimates.
August 27, 2025 Planning Commission Agenda Packet 68
Figure 3 does not include children or retired individuals who are not working. 5,521 individuals work
in Port Angeles, but do not live within city limits. These people may live in Clallam County, Sequim, or
closer to Port Townsend. 5,430 live in Port Angeles and work elsewhere. This is inclusive of
individuals who work from home or commute to Tacoma, Seattle, or Olympia. 3,581 individuals work
and live within Port Angeles city limits. Compared with other cities both nearby and in Kitsap County,
Port Angeles has a relatively high share of workers who both live and work in the city. This indicates
a relative balance of jobs to housing in the city and reflects Port Angeles’ status as the economic
center of the northern Olympic Peninsula. The city’s relative isolation also likely contributes to this
trend.
HOUSING SUPPLY
• There were 9,930 housing units in 2022, with almost three-quarters being single-unit buildings.
Additionally, 9.4 percent were middle housing types, and 15 percent were multifamily
apartments.
• Large units with three or more bedrooms represent half of the city’s housing stock.
• More than half of the housing in Port Angeles is old housing built before 1970.
• The current rent in Port Angeles averages about $1,118 per month, while housing prices are
approximately $452,961.
• Since 2010, the median income in Port Angeles has risen by 35 percent, which is like the median
gross rent increase of 34 percent. The home value has appreciated at a higher rate of 57
percent.
• Since 2014, the rent vacancy rate has decreased significantly from ten to around three percent.
Overall, 8.5 percent of housing units are unoccupied.
5,521
Work in Port
Angeles,
Live Elsewhere
5,430
Live in Port
Angeles,
Work Elsewhere
3,581
Live & work
in Port
Angeles
Source: U.S. Census Bureau Longitudinal Employer-Household Dynamics (LEHD) via Census OnTheMap
Figure 3. Commute Patterns in Port Angeles and Clallam County, 2022
August 27, 2025 Planning Commission Agenda Packet 69
To purchase a home at the average home price of $452,961, a household would need to make about
$114,000, which is 89 percent higher than the median income (see Figure 4). The median household
earning $60,212 could afford to purchase a house costing $239,107, assuming current interest rates, a
20 percent downpayment, and a 30-year mortgage. Therefore, there is a gap of about $213,596
between what the average household in Port Angeles could afford and the average prices of homes in
the city. Figure 4 shows the home price that households at various income levels in Port Angeles could
afford (in grey). The horizontal dashed lines show the median sales price and median household
income in Port Angeles.
Sources: 2010-2022 American Community Survey 5-Year Estimates, Table S2503; Zillow Home Value
Figure 4. Housing Affordability at Various Income Levels in Port Angeles, 2022
August 27, 2025 Planning Commission Agenda Packet 70
Figure 5 demonstrates the change of Census-reported total and occupied unit counts and vacancy rates
in Port Angeles over the past decade for both ownership and rental units. Although ownership vacancy
rates have remained relatively consistent over time, rental vacancy rates have dropped steadily since
2014, from 10 percent in 2014 to 2.8 percent in 2022. This trend indicates increased demand for
apartments in the city, and likely an undersupply. Low vacancy rates can make it harder for workers to
find housing, making it harder for local employers to recruit and retain workers, in addition to driving up
housing costs and exacerbating housing insecurity overall. The current vacancy rates for both rental and
ownership housing are below what is considered a “healthy” vacancy rate, which is between five and six
percent. This demonstrates a need for more housing production in the city to keep up with demand and
help improve housing affordability.
GAP ANALYSIS
• The availability of very low- and extremely low-income housing units is inadequate to serve
the current number of households in those income brackets.
• There is a gap between household size and unit size: there are more smaller households
than smaller units available.
Source: U.S. Census Bureau 2022 American Community Survey 5-Year Estimates, Table DP0
Figure 5. Housing Vacancy Rates in Port Angeles, 2012-2022
August 27, 2025 Planning Commission Agenda Packet 71
• The availability of median priced and above housing units is inadequate to serve the current
number of households in those income brackets.
Figure 6 illustrates the number of available housing units in red hatch mark lines and households in
the blue bar graph. If the hashed marks are above the blue bar, this illustrates a surplus of available
housing for that income bracket. Both figures 6 and 7 are sorted by area median income level. The
charts demonstrate a lack of available housing for both <30-50% AMI and >100% AMI. This lack of
housing has three outcomes:
1. Those experiencing the housing deficit at below 50% AMI cannot afford the available
housing.
Source: 2016-2020 HUD Comprehensive Housing Affordability Strategy (CHAS), WA Department of Commerce Housing
Planning for All Tool (HAPT).
Figure 6. Comparison of Housing Units and Household Incomes in Port Angeles, 2020
664 605
241 85 63 13 173
299
0-30%30-50%50-80%80-100%100-120%120% +Emergency
Housing
PSH non PSH
Source: WA Department of Commerce Housing Planning for All Tool (HAPT).
Figure 7. Port Angeles Target Housing Units by Income, 2024-2045
August 27, 2025 Planning Commission Agenda Packet 72
2. Those experiencing a housing deficit at above 100% AMI must occupy housing below what
is potentially attainable and not suited for their income.
3. Those residents between 50 and 80% AMI are having difficulty finding attainable housing
because of existing deficits in other AMI brackets.
Ultimately the 50-80% AMI residents housing availability is being compressed by residents who are
experiencing a lack of available housing in their income bracket.
LAND CAPACITY ANALYSIS
While Port Angeles has sufficient land capacity to meet the total housing unit target, there is a
shortfall of land for units that can accommodate low-income households when assessing which
households these units could serve. Therefore, to ensure capacity for low-income households, the
city will need to consider land use and zoning changes alongside the adoption of this
Comprehensive Plan update. (See Appendix C for the Land Capacity Analysis Map)
August 27, 2025 Planning Commission Agenda Packet 73
P ROJECT G OALS
City of Port Angeles Housing Goals
Through the City’s stakeholder advisory committee, the internal staff Comprehensive Plan steering
committee, and public engagement efforts, we have collaboratively identified five housing goals.
Goal G-6X: Housing Supply: Provide a sufficient supply, variety, availability, and attainability of
housing to meet community needs.
Goal G-6X: Housing Affordability and Access: Reduce disparities in housing access and mitigate
displacement impacts to vulnerable communities.
Goal G-6X: Housing Quality: Encourage the design, construction, and maintenance of housing to
keep homes in good condition.
Goal – 6X Collaboration for Affordable Housing: Partner with Clallam County, Peninsula Housing
Authority, and other entities and programs to increase the economic diversity of the housing supply.
Goal - 6X: Use the Housing Action Plan as a guide and implementation tool for City actions in
support of providing available State-supported financing options, municipal code revisions that
promote innovative housing products and designs, incentive zoning, and renovation/rehabilitation of
the City’s existing housing stock.
PU BLIC E NGAGEMENT
To be added at a later date
August 27, 2025 Planning Commission Agenda Packet 74
H OUSING D EVELOPMENT S TRATEGIES
TASK 1: HOUSING PIPELINE PROJECT
Strategy Addressed: Increase housing supply
City Council Strategic Focus Area: #3 Goal B
The City of Port Angeles has initiated the Housing Pipeline Pilot Project to address the shortage of
multifamily apartments, increase the affordable housing supply, and to encourage density in the
downtown area while creating a commercially oriented corridor This initiative is designed to
eliminate barriers such as land acquisition, site development challenges, and design work. The City
is committed to engaging with partners, land developers, and community members as it proactively
seeks to provide affordable housing and address the housing gap. The Housing Pipeline Pilot
Project will utilize state grants and City funds to develop a 14,000-square-foot lot located at 935 W
10th Street. This property is well-suited for development due to its location at the intersection of
10th and C Streets, which offers excellent access to public transportation. The lot is already served
by utilities, and its commercial zoning permits high-density residential development, making it an
ideal site for a significant number of housing units.
The City will either sell the site at a
nominal amount or enter a long-term land
lease; however, potential developers
must go through a Request for Proposal
(RFP) process, which will be determined
at the discretion of the City Council. The
project must ensure that housing is
available to individuals earning below
80% of the area's median income and will
remain affordable for a minimum of 40
years, if not longer. The Housing Pipeline
Pilot Project will serve as a
demonstration initiative to show that a
multi-story, multifamily housing
development, maximizing land capacity,
can be successfully achieved while
fostering a neighborhood with diverse
housing types.
Responsible Party: The City Manager’s Office and the Community and Economic Development
Department.
Funding Sources: Washington State Housing Trust Fund, Connecting Housing to Infrastructure
Program (CHIP), Affordable Housing Sales and Use Tax Funds.
Figure 8. 935 W 10th Street Site
August 27, 2025 Planning Commission Agenda Packet 75
TASK 2: MULTIFAMILY B UILDERS T RAINING
Strategy Addressed: Increase housing supply
City Council Strategic Focus Area: #3 Goal C
In partnership with the North Peninsula Builders Association, the Port Angeles Realtors Association,
and Peninsula College, the City of Port Angeles will facilitate a workshop series tailored to
prospective multifamily housing contractors and vendors. The initiative responds to the growing
need for quality housing in the community, particularly as the construction of multifamily apartments
has recently been dominated by the Peninsula Housing Authority and Peninsula Behavioral Health.
There has been a noticeable absence of large new market-rate apartment developments in Port
Angeles for several years. The workshop series will address this gap by providing valuable training
and resources to local builders, guiding them on best practices for constructing multifamily housing
that effectively meets the diverse needs of the Port Angeles community. The series will specifically
focus on designs and construction methods suitable for populations with incomes between 0% and
120% of the area median income, emphasizing affordability and accessibility.
Participants can expect expert-led sessions that cover regulatory requirements, innovative building
techniques, and community engagement strategies, all aimed at fostering a collaborative approach
to housing development in Port Angeles. This initiative represents a proactive step towards creating
a more inclusive and sustainable housing landscape for Port Angeles residents.
Responsible Party: The Community and Economic Development and the Public Works and Utilities
Departments.
Funding Sources: To be determined.
Figure 9. 306 W 1st Street Multifamily Residential Building
August 27, 2025 Planning Commission Agenda Packet 76
TASK 3: FEE WAIVER PROGRAM
Strategy Addressed: Increase the variety of housing type
City Council Strategic Focus Area: Not yet addressed in the City of Port Angeles Strategic Plan
The permit fee waiver program is part of the City's existing affordable housing initiatives, which were
implemented in November 2023 (Ordinance No. 3723). This program will be managed until 2033, at
which point the Port Angeles City Council will evaluate its effectiveness. The fee waiver program
(FWP) eliminates 25 building and land use permit fees, designed to encourage the development of
infill, multifamily, and affordable housing units in Port Angeles. Additionally, it aims to lower financial
barriers, making development more accessible for residents, builders, and developers. This fee
waiver program is among the most successful city-run affordable housing initiatives, having saved
residents, builders, and developers a total of $479,005.98 to date (August 2025). In the coming
years, city staff will be looking for innovative ways to streamline and advance the fee waiver
program.
Responsible Party: The Community Economic Development, Fire, and the Public Works and Utilities
Departments.
Funding Sources: N/A
Figure 10: Fee Wavier Brochure
August 27, 2025 Planning Commission Agenda Packet 77
TASK 4: CO-LIVING HOUSING MUNICIPAL CODE UPDATE
Strategy Addressed: Increase the variety of housing types
City Council Strategic Focus Area: Not yet addressed in the City of Port Angeles Strategic Plan
"Co-living housing" refers to a type of residential development that includes individually rented and
lockable sleeping units, each providing living and sleeping space. Residents share kitchen facilities
and potentially restroom facilities with others in the building. According to RCW 36.70A.535, the City
of Port Angeles will be updating its municipal code to permit co-living as an acceptable use on any
lot within an urban growth area that allows for a minimum of six residential units. This includes lots
zoned for mixed-use development. As housing in Washington has become increasingly unaffordable,
interest in co-living arrangements has grown significantly. Co-living offers several benefits:
•It provides market-rate, non-subsidized rental homes that are affordable for people in the
workforce earning as little as 50 percent of the area median income. For instance, older co-
living units in the Spokane area can cost as low as $350 per month, while some new co-living
units in the Puget Sound suburbs rent for around $1,000 per month.
•It presents a low-cost, private alternative for individuals seeking to avoid traditional
roommate situations.
•It encourages community-building through shared living spaces that foster social
connections.
•It increases affordable housing options in high-opportunity neighborhoods with good
transportation access.
•It helps reduce energy demand, as co-living units are typically smaller, and the development
of this type can lessen commutes and urban sprawl.
Figure 11. Co-living Sample Floor Plan
August 27, 2025 Planning Commission Agenda Packet 78
Modern co-living buildings are often of high quality and may feature attractive amenities.
Stakeholders have noted that co-living is a fantastic option for seniors looking to downsize, and it
helps build community and lessen feelings of loneliness for people of all ages. Co-living
arrangements are particularly suitable for urban infill development on narrow lots since the rent per
square foot tends to be higher than that of other multifamily building types. Like any development,
co-living buildings must comply with all relevant building, fire, and life safety codes. For these
reasons and more, co-living is an effective approach to addressing the housing needs in the state.
Responsible Party: The Community and Economic Development Department.
Funding Sources: N/A
August 27, 2025 Planning Commission Agenda Packet 79
TASK 5: PERMIT READY PLANS
Strategy Addressed: Increase the variety of housing types
City Council Strategic Focus Area: Not yet addressed in the City of Port Angeles Strategic Plan
In 2023, the City of Port Angeles utilized the Housing Action Plan Implementation (HAPI) grant to
develop a set of permit-ready plans. These pre-designed building and engineering plans are available
to residents of Port Angeles free of charge. The permit-ready plans simplify the permitting process
and eliminate fees associated with plan development and review.
The city offers four small lot home designs, ranging from 400 to 800 square feet, which include both
single-story and two-story options. These small home designs can be used as Accessory Dwelling
Units (ADUs) or as primary residences. Additionally, there is a Townhome Unit Plan with a total
footprint of 2,543 square feet.
Residents and developers within the Port Angeles city limits can access permit-ready plans for free,
benefit from an expedited permit review process, and receive a waiver for permit fees. In the coming
years, the City will update these plans to align with the evolving building and energy code
requirements. The City will continue to engage in discussions with local builders and organizations,
to explore creating more permit-ready plans for the community. In the future, the City will expedite
the building permit review process to make Permit Ready Plans an over-the-counter process,
allowing applicants to obtain approval within 24 hours. In the coming years, the City will work
towards building a permit ready plan library and gathering resources to make these homes easier to
build and finance. City staff will also improve the permit ready plan application process by tracking
how long and how much money it takes to build these plans.
Responsible Party: Requires all departments due to the review of the permit ready plans.
Funding Sources: The Washington State Department of Commerce Housing Action Plan
Implementation Grant.
Figure 12. City of Port Angeles Permit Ready Plan Townhouse Model
August 27, 2025 Planning Commission Agenda Packet 80
TASK 6: MULTIFAMILY PROPERTY TAX EXEMPTION (MFTE)
Strategy Addressed: Increase the supply of housing affordable to all income levels
City Council Strategic Focus Area: Not yet addressed in the City of Port Angeles Strategic Plan
The City of Port Angeles will continue to operate the Multifamily Property Tax Exemption (MFTE)
program in collaboration with the Clallam County Assessor's office. Cities and counties implement
MFTE programs to support local housing objectives by waiving property taxes. According to Chapter
84.14 RCW, local governments can provide exemptions for new construction, conversion, and
rehabilitation of multifamily residential properties that contain at least four units. Under these
exemptions, property owners are exempt from paying property taxes on residential improvements
for a specified number of years. However, property owners are still responsible for paying taxes on
the land and any non-residential improvements, such as the commercial portions of mixed-use
buildings.
The Multifamily Property Tax Exemption (MFTE) in Port Angeles provides qualified multifamily
housing properties with a property tax exemption on the value of residential improvements for a
duration of 8, 12, or 20 years (for self-help homeownership programs). This initiative, offered by the
City of Port Angeles, aims to promote the development of more multifamily and affordable housing,
thereby reducing barriers to housing
development.
In the 2025 legislative session, House Bill
1494 (Chapter 164, Laws of 2025) was
passed. This bill implements
recommendations from Commerce’s 2023
Legislative report to improve the
multifamily tax exemption (MFTE)
program. The bill extends the 20-year rental
program to 70 cities. It also requires
jurisdictions to follow anti-displacement
requirements in their MFTE program and
strengthens the tools for jurisdictions to
enforce compliance from participants. The
Washington State Department of
Commerce will update MFTE guidance by
spring 2026, and the City of Port Angeles
will adopt any necessary updates to the
MFTE program.
Responsible Party: The Community Economic Development Department and the Clallam County
Assessor.
Funding Source: N/A
Figure 13. Multifamily Duplexes at 1012 W 17th Street
August 27, 2025 Planning Commission Agenda Packet 81
TASK 7: SALES AND USE TAX GRANTS
Strategy Addressed: Increase the housing affordable to all income levels
City Council Strategic Focus Area: Not yet addressed in the City of Port Angeles Strategic Plan
Pursuant to RCW 82.14.530, the Port
Angeles City Council adopted ordinance
3655 authorizing a Sales and Use Tax for
affordable housing in the amount of
1/10th of 0.01%. Voters passed this
initiative, and it took effect on April 1,
2020. Affordable Housing Sales and Use
Taxes are collected upon the transaction
of all retail sales inside the Port Angeles
City limits. Affordable Housing Sales and
Use Tax Grants must be used to assist
with constructing, procuring, and
stabilizing affordable housing and
housing-related assistance programs for
households with incomes at or below
60% of the area median income (AMI).
In practice, Affordable Housing Sales and
Use Tax Grants must be utilized for
various purposes aimed at enhancing
affordable housing options. Examples of
the types of housing that may be funded include emergency housing, transitional housing,
supportive housing, and the addition of new affordable housing units within existing structures.
Facilities that provide housing-related services and acquire land for these initiatives are also eligible
for funding.
Additionally, the grants can support the construction or acquisition of properties intended for use in
behavioral health-related facilities, as well as land acquisition for these purposes. Furthermore, the
funding can cover the operational and maintenance costs of new affordable housing units and
facilities where housing-related programs are offered, as well as newly constructed evaluation and
treatment centers. It is important to note that the affordable housing and facilities providing these
essential programs are specifically directed to assist individuals from certain population groups.
This includes those with behavioral health disabilities, veterans, senior citizens, individuals who are
homeless or at risk of becoming homeless, unaccompanied homeless youth or young adults,
persons with disabilities, and survivors of domestic violence, all of whom have incomes at or below
sixty percent of the median income within the jurisdiction imposing the tax. In the coming years, the
City of Port Angeles will be working with local non-profits and religious organizations.
Responsible Party: The Community and Economic Development and the Finance Departments
Funding Source: 1/10 of 1% of the City of Port Angeles Sales and Use Tax as authorized through
RCW 82.14.530 and RCW 82.14.540.
Figure 14. Rendering of 4PA’s Touchstone Campus Tiny Homes
August 27, 2025 Planning Commission Agenda Packet 82
TASK 8: COPA WEATHERIZATION PROGRAM
Strategy Addressed: Support preservation of existing housing
City Council Strategic Focus Area: Not yet addressed in the City of Port Angeles Strategic Plan
The City of Port Angeles offers a free weatherization program for low-income households. This
program provides increased incentives for both homeowners and tenants.
Weatherization is a valuable investment that can significantly enhance the comfort and efficiency of
your home. By properly sealing gaps, adding insulation, and making necessary upgrades, you can
create a more consistent indoor temperature year-round. This not only reduces the strain on your
heating and cooling systems, ultimately lowering your energy bills, but also contributes to a healthier
living environment by minimizing drafts and reducing moisture buildup. Additionally, weatherization
can increase the lifespan of your HVAC systems and boost your home's resale value, making it a
smart choice for any homeowner looking to blend cost savings with long-term benefits.
Many homeowners in Port Angeles have benefited from free or reduced-cost upgrades through this
initiative.
If you are approved for the Free Weatherization
Program, you will be eligible for the following
benefits:
•Windows: Up to $20 per square foot of
glass
•Insulation: Up to 100% coverage of the
cost for qualifying installations
•Ductless Heat Pump: Up to $6,000
toward the installation of a qualifying
unit
•Heat Pump Water Heater: Up to $3,000
for a qualifying water heater
In the coming years, the City of Port Angeles
will work closely with local weatherization
service providers to do more direct outreach to
community members that qualify for this
program.
Responsible Party: The Public Works and Utilities Department.
Funding Source: Bonneville Power Administration.
Figure 15: Weatherization Graphic
August 27, 2025 Planning Commission Agenda Packet 83
TASK 9: DOWN PAYMENT ASSISTANCE HOME BUYERS GAP PROGRAM
Strategy Addressed: Mitigate economic displacement pressures
City Council Strategic Focus Area: Not yet addressed in the City of Port Angeles Strategic Plan
Port Angeles has a significant population of renters compared to homeowners. In 2022, 44% of
residents in Port Angeles rented their homes, while the average for Washington State was 36%, and
Clallam County had 27%. Additionally, there is a noticeable disparity between renters and
homeowners regarding the number of households that are cost-burdened (see appendix C). 24% of
renter-occupied households are severely cost-burdened, while 27% are cost-burdened. In contrast,
9% of owner-occupied units are severely cost-burdened, and 17% are cost-burdened (see Appendix
B: Housing Needs Assessment). The City aims to promote the development of subsidized rental
units in Port Angeles for the city's lowest-income households while also fostering homeownership
within our community. In the coming years, the City of Port Angeles will be working with community
housing partners, the Port Angeles Association of Realtors, and local financial institutions providing
home loans to find innovative ways to help more community members achieve homeownership
within the city.
Responsible Party: Partnership with local banks and homeownership stakeholders
Funding Source: N/A
Figure 16. Clallam County Attainable Workforce Housing Summit
August 27, 2025 Planning Commission Agenda Packet 56
TASK 10: CITY-WIDE HOMELESSNESS NAVIGATOR
Strategy Addressed: Mitigate economic displacement pressures
City Council Strategic Focus Area: #2 Goal B Measure 1
The City of Port Angeles has several programs to address homelessness. The Fire Department
operates a community paramedic program, while the Police Department oversees the REdisCOVERY
Program. The Parks Department is responsible for cleanup efforts on City-owned land. Additionally,
the City relies heavily on partnerships with community-based organizations, including the North
Olympic Healthcare Network, Olympic Medical Center, Olympic Peninsula Community Clinic,
Peninsula Behavioral Health, Reflections Counseling, The Answer for Youth, Peninsula Housing
Authority, 4PA, Serenity House, and the Clallam County Homelessness Taskforce.
To assist community members facing housing instability, connect organizational efforts, and
explore innovative solutions to reduce homelessness in the upcoming years, the City plans to hire a
navigator.
Responsible Party: The Parks and Recreation Department and the City Manager’s Office.
Funding Source: A portion of the business licensing revenue
Figure 17. Serenity House Homelessness Shelter
Source: Serenity House of Clallam County
August 27, 2025 Planning Commission Agenda Packet 57
11.BLIGHTED PROPERTY REDUCTION STRATEGY
Strategies Addressed: Increase Housing Supply
City Council Strategic Focus Area: #3 Goal D Measures A, B, C,D
Substandard and dangerous buildings pose significant risks to our community. When vacant
properties are not properly secured, they become even more hazardous, as the public can easily
access them. Such buildings may attract criminal activity, trespassers, trash, and debris.
Additionally, squatters in these vacant structures can create fire hazards that pose a risk to everyone
in the vicinity. It's important to note that a building being unoccupied is not inherently a violation.
There are many reasons a property might be unoccupied, such as a homeowner living in another city
part of the year, being in the process of moving, or having a house for sale. An unoccupied building
is classified as a vacant structure. It becomes a code violation only if it is deemed "unsafe or unfit
for human habitation or other authorized use" or if it qualifies as a nuisance property, as defined by
city regulations.
The city has broadened the definition of a vacant building to include properties that are unoccupied
yet not visibly unsafe or unfit. The term "nuisance vacant building" or “blighted property” has been
established to refer to properties that have two open violations for an extended period or those that
have received six separate sanitation citations within a 12-month period. If these criteria are met, a
Building Inspector can issue a vacant building notice for a property that is unoccupied but does not
yet display visible signs of being unsafe or unfit from the outside.
Source: Peninsula Daily News
Figure 18. Razed Abandoned Building in the 200 Block of East Front Street
August 27, 2025 Planning Commission Agenda Packet 58
If a property owner is not responsive to the notice/red tag, then the City will explore corrective
actions like:
• Civil or criminal legal action.
• Taking corrective action at the owner's expense.
• The City may use eminent domain to purchase and redevelop the property.
In addition to the nuisance vacant building/blighted property actions, the City will also explore
additional property taxes on undeveloped land. City staff will explore connecting the blighted
property reduction strategy with the existing low-income homeownership sweat equity programs like
Habitat for Humanity of Clallam County, Peninsula Housing Authority, and the Olympic Housing
Trust.
The City of Port Angeles is both land-constrained and, in some areas, has limited utility capacity. We
must use all available land to its full capacity.
Responsible Party: The Police Code Enforcement, the Community and Economic Development, the
Legal Department, and the Fire Departments.
Funding Source: This action will generate funding
August 27, 2025 Planning Commission Agenda Packet 59
IM PLEMENTATION SCOPE + SCHEDULE
This schedule is currently in draft form. The final schedule will be presented to
Planning Commission for their review on October 22.
Co-living Municipal Code Update
1. Identify existing conditions and which zones in the Port Angeles Municipal Code (PAMC)
have the capacity for co-living.
2. Conduct public engagement through the Planning Commission presenting co-living
municipal code update to the community.
3. Present the co-living municipal code update to the Planning Commission in a public hearing
for recommendation to the City Council.
4. City Council will make the final decision in adopting the co-living municipal code update.
Multifamily Builders Workshops
1. Secure Funding and Timelines: Identify and pursue funding sources to support the planning,
facilitation, and delivery of the workshops. Establish a clear project timeline to guide key
milestones and ensure the workshops are launched successfully and on schedule.
2. Establish Partnerships & Develop Curriculum Framework: Engage with key partners—
including local builders, housing advocates, educational institutions, and industry
associations—to collaborate on workshop planning. These partnerships will ensure that the
curriculum reflects both local development challenges and opportunities.
3. Design a Multifamily Housing Curriculum: Work collaboratively to develop a workshop
curriculum focused on the end-to-end process of multifamily housing development. Topics
will include permitting pathways, design best practices, financing strategies, and
construction planning—tailored to the needs of local builders and stakeholders.
4. Schedule and Promote Workshops: Select initial workshop dates with adequate lead time
for promotion and outreach. Establish a consistent meeting cadence—such as monthly or
quarterly—based on participant interest, facilitator availability, and alignment with broader
housing development goals.
Housing Pipeline Project
1. Community Outreach and Engagement: The City will host a public outreach session to
gather community input on the future vision for the 935 W 10th Street site. Special efforts
will be made to engage residents living near the C Street corridor to ensure their
perspectives are included in the planning process.
2. Consultant Procurement: Request for Qualifications (RFQ): An RFQ will be issued to identify
and select a qualified engineering and architectural consultant. The selected firm will lead
predevelopment planning and site preparation activities.
3. Request for Proposals (RFP) Advertisement: The City will advertise a Request for Proposals
(RFP) for the development of the 935 W 10th Street site. This process invites eligible
organizations to submit comprehensive proposals for the site’s redevelopment.
4. Proposal Prioritization Criteria: City staff and the Port Angeles City Council will evaluate
proposals based on their ability to deliver high-density housing and affordability for
households earning 80% or less of the area median income (AMI).
August 27, 2025 Planning Commission Agenda Packet 60
5.Site Transfer Agreement: The City intends to transfer site control of 935 W 10th Street
through a long-term land lease or at a nominal cost to the organization that presents the
most impactful and community-aligned development proposal.
6.Program Evaluation and Replication: Upon completion of this project phase, the City will
conduct a comprehensive review of the Housing Pipeline Project. This evaluation will assess
outcomes, identify lessons learned, and explore the potential to replicate the model for
future housing development efforts.
Homeownership program
1.Community-Based Outreach and Partnership Building: The City will engage with community-
based organizations to assess how best to address gaps in homeownership support
programs. This outreach will help identify opportunities for collaboration and ensure any new
City efforts are aligned with community needs and existing resources.
2.Down Payment Assistance Program Feasibility: The City will conduct a feasibility study to
explore the potential for establishing a one-time down payment assistance program aimed
at increasing homeownership among income-eligible households.
3.Exploring Financial Institution Partnerships: In lieu of a City-run program, the City will
evaluate potential partnerships with local financial institutions to promote and expand
access to down payment assistance for first-time homebuyers.
City-Wide Homelessness Navigator
1.Position Hosting and Oversight: The City will establish a dedicated position focused on
addressing homelessness and housing instability. The role will be housed within an
appropriate City department to ensure coordination with related community services and
programs.
2.Position Development: City leadership will draft the job description and define clear Key
Performance Indicators (KPIs) to measure the effectiveness and impact of the role. These
metrics will guide performance evaluation and continuous improvement.
3.Collaborative Engagement and Needs Assessment: Upon hiring, the Homelessness and
Housing Instability Coordinator will participate regularly in the Clallam County Homelessness
Task Force and collaborate with partner organizations already serving unhoused and
housing-insecure populations. These efforts will support a coordinated approach to
identifying and addressing service gaps within the system of care.
Blighted Property Reduction Strategy
1.Identification of Blighted Properties: A coordinated effort will be undertaken to identify
properties that exhibit signs of significant disrepair, prolonged vacancy, or pose a potential
hazard to the surrounding community.
2.Assessment and Documentation: Once identified, properties will be assessed to determine
whether they have been vacant or hazardous for an extended period (e.g., 18 months or
more). Appropriate documentation will be collected to support further action. In certain
cases, visible signage may be placed on the property to indicate its condition and encourage
accountability.
August 27, 2025 Planning Commission Agenda Packet 61
3. Notification and Opportunity for Remediation: Property owners will be notified of the
identified concerns and given the opportunity to take corrective measures. The goal is to
encourage voluntary compliance and timely remediation.
4. Escalation for Non-Response or Inaction: If no meaningful progress is made within a
reasonable period (e.g., six months), additional steps may be taken to address the property.
These may include legal remedies, corrective actions initiated by the City, or other measures
allowed under applicable regulations.
5. Outcome and Resolution: The process concludes when the property is either rehabilitated,
actively undergoing redevelopment, or otherwise resolved in a manner that improves
neighborhood conditions.
August 27, 2025 Planning Commission Agenda Packet 62
APPENDIX A : HOUSING POLICY ANALYSIS GOALS FROM THE 2019 HAP
The 2019 HAP identified eleven housing task objectives to be achieved over the next ten years. City
staff have made progress on each task:
Task 1: Continue differential taxing rates for affordable housing purposes
Maintain property tax exemptions – for multifamily projects that include affordable housing
components within designated areas for up to 12 years for all improvements to new or rehabilitated
building elements – but not land in accordance with RCW 84.14.
Validate differential property tax rates and exemptions - following appropriate hearings and public
comment in accordance with the provisions of the Growth Management Act (GMA) for a differential
property tax rate assessment schedule that reflects actual land use and that will favor and tend to
prime the use of land leases under community land trusts and affordable housing projects.
Staff Progress: Task 1 to “continue differential taxing rates for affordable housing projects” has
been accomplished. City Staff have maintained the multifamily property tax exemption (MFTE)
program. Since the MFTE programs inception in 2019, the City has issued four final certificates for
the multifamily tax exemption to multifamily projects in Port Angeles.
Future Work: The City of Port Angeles has yet to evaluate property tax rates and exemptions for
community land trusts and for affordable housing project. More research needs to be done to see
what other jurisdictions have done to accomplish this taxation model.
Task 2: Allow and encourage the use of innovative housing products and designs
Maintain lot size averaging – subdividing land into parcels that may be smaller than the minimum lot
specified in the zoning district so long as the average of all the lot sizes created remains equal to or
above the minimum lot size. Lot size averaging is like cluster development in that it makes efficient
use of the developable portions of a site building to the allowable density while protecting
environmental and other features and providing housing type developments that are compatible with
the surrounding neighborhood.
Implement Cottage Housing Development (CHD) – that allows small lot single family housing
developers to construct these types of housing products in feasible and appropriate single-family
neighborhoods including Residential Single Family (RS-7, RS-9, and RS-11) zones where the added
density will benefit from walkable distances to existing transit, school, employment, community
facility, and other supporting services.
Implement overlay districts – including Cottage Housing Development (CHD), Planned Residential
Development (PRD), Planned Low Impact Development (PLID), Infill Overlay Zone (IOZ), Planned
Industrial Development (PID), and Mixed Commercial Overlay (MCO) that reduce or remove
unnecessary property setbacks, maximum site coverage allowances, and other restrictions that
prevent the use of innovative, functional, and cost-effective land and housing products.
August 27, 2025 Planning Commission Agenda Packet 63
Update zoning and development regulations - to expand the definition of allowable innovative,
functional, and cost-effective housing products such as duplex, attached single family, town or row
houses, tandem houses, manor houses, congregate housing, micro housing, small efficiency
dwelling units (SEDU), and mixed-use structures among others in the Residential Medium Density
(RMD) and Residential High Density (RHD) zones.
Staff Progress: Staff have accomplished all the subtasks in maintaining lot size averaging,
implementing cottage housing developments, created overlay zones (mixed commercial, infill,
planned residential development, planned industrial development, and planned low impact
development overlay zones), and updated zoning and development regulations.
Future Work: After the adoption of the Vision 2045 comprehensive plan and the Housing Action
Plan, City Staff will be working to update the zoning code and design standards to better meet the
needs of our community members.
Task 3: Implement Accessory Residential Unit (ARU) program
Note: The 2019 HAP uses the term “Accessory Residential Unit or ARU”, and the Port Angeles Municipal
Code uses the term “Accessory Dwelling Unit or ADU” interchangeably.
Amend existing ARU ordinance to remove homeowner occupant requirement.
Continue deferring permit and planning review fees, utility connection charges, and impact fees for
affordable ARUs – until such time as the ADU affordable units, if ever, are sold or rented in the
marketplace as market rate housing at which time the deferred fees will be repaid to the Port
Angeles Affordable Housing Fund (AHF).
Pre-approve ARU design manual and prototypes – using kit housing projects like Lowe’s Katrina
Cottages and including local architect’s ADU plans per Seattle and Santa Cruz, California example.
Establish an ARU low-cost loan program – working with local lenders per Craft3 or First Federal.
Staff Progress: At the City of Port Angeles, we now refer to Accessory Residential Units (ARUs) as
Accessory Dwelling Units (ADUs). In November 2023, the Port Angeles City Council permanently
waived building permit fees associated with affordable, infill and multifamily housing projects. The
goal of this program is to reduce financial barriers and make development more affordable and
accessible for residents, builders and developers alike. Permit fee waivers are now offered for 15
different housing types, including qualifying single-family household projects in the same year, City
staff collaborated with an architectural firm to create permit-ready plans for Accessory Dwelling
Units (ADUs) and townhomes.
This program reduces the burden of cost and time spent by potential applicants. Pre-designed
building and engineering plans, which are available completely free of charge, streamline the permit
process and eliminate fees associated with plan development and review. You can choose from four
small lot home designs (400 to 800 sq ft), including both single-story and two-story plans. We also
have a townhome permit ready plan design. The permit ready plans and fee waivers make ADUs and
infill housing more affordable and attainable for Port Angeles community members.
August 27, 2025 Planning Commission Agenda Packet 64
Future Work: The City has not created or partnered with local lenders to create an ADU loan
program.
Task 4: Implement incentive zoning – noncash density off-sets
Maintain incentive zoning allowance – providing additional (height) floor, reduced parking ratios, and
increased site coverage for mixed-use projects that provide on or off-site affordable housing units
within appropriate land use districts and overlays such as the Planned Residential Development
(PRD), Planned Low Impact Development (PLID), Mixed Commercial Overlay (MCO), and Infill Overlay
Zone (IOZ).
Design for ground floor retail – but allow interim or temporary non-retail uses until the market can
sustain retail tenants in all commercial and mixed-use zones including Commercial Neighborhood
(CN), Community Shopping District (CSD), Commercial Arterial (CA), and Central Business District
(CBD) as well as the Planned Residential Development (PRD), Planned Low Impact Development
(PLID), Mixed Commercial Overlay (MCO), and Infill Overlay Zone (IOZ).
Evaluate transfer development rights (TDR) housing credits – for the feasibility of identifying
sending and receiving zones for transferring housing density credit units when the increased density
allowed by providing affordable housing units within a mixed-use project will not be provided on-
site.
Allow fee-in-lieu – provide a fee-in-lieu program where developer pays into the Port Angeles
Affordable Housing Fund (AHF) the equivalent amount for the development of an affordable housing
unit when the affordable housing units will not be provided on-site.
Staff Progress: The Port Angeles Municipal Code (PAMC) maintains incentive zoning allowances.
Building height bonuses, parking reduction tools and increased site coverage for mixed-use projects.
The PAMC also allows for ground floor retail in residential buildings in the listed zones and overlays.
The City has not adopted a transfer development rights housing credits or a fee-in-lieu program. The
existing comprehensive fee waiver program does not collect building or development fees for ADUs,
duplexes, triplexes, fourplexes, cottage housing, caretaker units, apartments/multifamily housing,
townhomes, group homes, permanent supportive housing, transitional housing, emergency housing,
adult family housing, single family homes in self-help programs (Habitat for Humanity and Peninsula
Housing Authority), and single-family homes of applicants experiencing economic hardship. We will
not be doing a fee-in-lieu program because any permitting fees that we do receive need to be used
for operational expenses. Likewise, we will not be implementing transfer development rights housing
credits because the same density incentives are achieved through incentive zoning.
Task 5: Implement incentive zoning – cash offsets
Defer permit and planning review fees for affordable units – until such time as the affordable units, if
ever, are sold or rented in the marketplace as market rate housing at which time the deferred fees
will be repaid to the Port Angeles Affordable Housing Fund (AHF).
August 27, 2025 Planning Commission Agenda Packet 65
Defer utility connection charges for affordable units – until such time as the affordable units, if ever,
are sold or rented in the marketplace as market rate housing at which time the deferred utility
connection charges will be repaid to the AHF.
Defer Park, traffic, and school impact fees – if adopted, until such time as the affordable units, if
ever, are sold or rented in the marketplace as market rate housing at which time the deferred impact
fees will be repaid to the AHF.
Staff Progress: Since the 2018 Housing Action Plan the City of Port Angeles has gotten rid of all
parks, traffic, school, and fire impact fees. The fee waiver program waives permit, planning, most
public works fees for the housing types described above.
Task 6: Package a demonstration project site
Package a demonstration project site - to create a prototype mixed-use project for market rate and
affordable units in the downtown, medical center, and/or high-density residential neighborhood.
Utilize the Jefferson/Clallam County Community Land Trust – including the management
organization, bylaws, lease rates, and other provisions for all units – market rate and affordable –
and the equity.
Staff Progress: The City has purchased a property at 935 W 10th Street as a part of the Housing
Pipeline Project (see the recommendation section for more information). This land acquisition will
work to build dense multifamily housing in a walkable neighborhood. Additionally, the City is starting
to have conversations with the Olympic Housing Trust and learning about ways to support their
organization and the community land trust model.
Task 7: Initiate a catalytic mixed-use project with affordable units
Create development solutions for the property – that develop the property under alternative
scenarios using the noncash density incentives provided for additional height, reduced parking ratio,
and increased site coverage allowances.
Assess the economic feasibility of the preferred concepts – to determine land value, construction
cost, indirect development cost – and the impact of noncash and cash off-set incentives,
Assess partnership opportunities – including purchase of the land for a land trust by a nonprofit
entity, and the purchase of some affordable units by the Peninsula Housing Authority for very low-
income households.
Assess and mitigate environmental impacts – to assess on and off-site stormwater run-off, design
aesthetics, and urban amenities.
Conduct public hearings and approve a pre-packaged plan solution – including appropriate property-
specific development agreements, design guidelines, and SEPA MDNS or EIS mitigation
documents.
August 27, 2025 Planning Commission Agenda Packet 66
Develop a competitive process – governing the sale or long-term lease and development of the
property for the preferred and pre-approved design/develop solution.
Judge proposals – by fixing the asking price for the property and ranking proposals on design merits
and beneficial impacts on the city’s affordable housing objectives.
Award project – following public hearings and review procedures, award the project to the proposal
ranked to have the most design merit and beneficial affordable housing development impacts on the
property, downtown, and city.
Staff Progress: These tasks have not been accomplished yet. We are planning on accomplishing
this task in the Housing Pipeline project through 2030 (see the recommendation section for more
information).
Task 8: Establish a Port Angeles Affordable Housing Fund (AHF)
Conduct a public survey of voter households to determine public support – for the use of an
allocation from General Funds (GF), an allocation from the Real Estate Excise Tax (REET), a special
Property Tax Levy (PTL) or limited levy lid lift dedicated to affordable housing and/or a countywide
Local Option Sales Tax (LOST) dedicated to affordable housing to provide affordable housing cash
off-sets and match fee-in-lieu payments, public and non-profit donations, grants, loans, and other
funding measures with which to implement pro-active housing programs and projects.
Submit and approve a financing mechanism(s) – based on the results of the survey, submit
referendums necessary to create a revolving capital fund necessary for implementing pro-active
housing programs and projects.
Capitalize the revenues – with which to initiate acquisitions, prime infrastructure development,
conduct RFP design/develop competitions, and other implementing actions appropriate to the
proposed pro-active housing programs and projects.
Partner with a management entity – for implementation to a new or existing nonprofit housing
agency such as Peninsula Housing Authority.
Staff Progress: The Sales and Use Tax fund and the New Improvement and Community
Enhancement (NICE) neighborhood fund are used to capitalize on the revenues for affordable
housing developments and infrastructure improvements.
Additionally, as the City has sent out survey questions regarding housing funding. The housing
pipeline project will partner with a management entity for the new housing stock that is created.
Task 9: Refinance overextended households
Using the Port Angeles Affordable Housing Fund (AHF) and the Housing Rehabilitation Fund,
establish an affordable housing deferred loan or shared equity program where the eligible
homeowner’s house is acquired then sold back to the homeowner under terms that the homeowner
can afford remaining within the 30% of gross income devoted to housing occupancy costs. Where
necessary and appropriate, utilize grants, loans, limited and land trusts, reverse mortgages, and
August 27, 2025 Planning Commission Agenda Packet 67
other refinancing terms that will allow the homeowner to remain resident in the house, keep the
house in viable shape, and where appropriate, retain an affordable price or terms so that the unit can
be resold at a future time as an affordable housing unit.
• Identify homeowners – who would be eligible and capable of participating in the shared or
deferred equity-refinancing program.
• Identify income and financial capability – of the occupants to create feasible and
appropriate refinancing terms using grants, low and no-interest loans, land trusts, and shared
or deferred equity approaches.
• Create performance criteria governing refinancing packages – necessary to guarantee
homeowner equity and financial solvency, while repaying the Port Angeles Affordable
Housing Fund (AHF) when the house is ultimately sold or inherited and/or retaining the
housing unit in the affordable housing supply to be resold in the future to eligible low-income
households.
• Assign a management entity – capable of monitoring compliance with the refinanced
mortgage terms and the eventual sale and repayment, or sale and resale of an affordable
unit in the market.
• Create a housing loan trust – able to fund refinancing packages and hold the loan or equity
or land title in trust until such time as the house is sold and the loan is redeemed in full, or
the house is resold under a limited or shared equity approach.
Staff Progress: The City does not act as the direct contact for programs related to refinancing
mortgages on overextended households.
Future Work: The City will partner with local banks and community organizations to refer
overextended households to those existing programs.
Task 10: Renovate (and possibly acquire) eligible housing with shared and limited
equity loan programs
Using the Port Angeles Affordable Housing Fund (AHF) and the Housing Rehabilitation Fund, as well
as FHA 203(k) and HomeStyle Fannie Mae loans establish a home acquisition, rehabilitation, and
deferred loan or shared or limited equity program including where the qualifying household and
eligible house is refurbished (and potentially acquired) and the cost or loan is deferred for payment
to when the house is sold or resold to the occupant with land leases and the land equity is deferred
or used to reduce payment terms to allow the current (or new) occupant to continue to reside in the
house with current home payments.
• Identify homeowners – who would be eligible and capable of participating in the
rehabilitation and shared or deferred equity program.
• Identify rehabilitation program requirements – including the potential number of housing
projects, deferred or limited equity program participants, and required number and skill of
renovation contractors or agents including occupants (and buyers) capable of performing
self-help improvements or “sweat equity”.
August 27, 2025 Planning Commission Agenda Packet 68
•Create performance criteria governing contractor selection and oversight – necessary to
warrant quality work, timely work schedules, bonded workers and project sites, and other
rehabilitation program particulars including by homeowner/buyer self-help participants.
•Create a management entity – capable of overseeing rehabilitation work, contract
compliance, and the shared or deferred or limited equity program.
•Create a housing loan trust – using the Port Angeles Affordable Housing Fund (AHF) to fund
rehabilitation and hold the loan or equity in trust until such time as the house is sold and the
loan is redeemed in full, or the house is resold under a limited or shared equity approach.
Staff Progress: The City relies on the existing programs offered by Habitat for Humanity of Clallam
County and Peninsula Housing Authority. Those programs both offer housing rehab and sweat
equity programs for homeownership.
The City of Port Angeles has existing residential and commercial rebates and conservation program
as well as weatherization improvements for low-income households.
Task 11: Issue periodic reports and update the Housing Action Plan on a frequent
basis
Conduct implementation progress assessments to review action on projects and policies identified
in this Housing Action Plan and measure the following:
•Accomplishment of the strategies - listed in the action plan and the impact the strategies are
having on housing costs.
•Number of affordable units built - by public, nonprofit, and private sponsors over the
measuring time period.
•Turnover rates realized in the housing market - for all value of housing including affordable
value ranges during the measuring time period.
•Comparison with housing census statistics - for percent of income required for housing
costs, number, and percent of households in poverty and housing status.
•Public satisfaction - with housing conditions in general and perception of their ability to buy
or rent a quality affordable housing unit.
Make revisions or adjustments necessary - to improve methods, assign responsibilities, or take other
measures necessary to be effective in the market based on the progress assessment findings.
Staff Progress: This Housing Action Plan Periodic Update accomplished Task 11 as it provides
detailed data and updated strategies to meet our housing needs. A subsequent review will occur in
2030.
August 27, 2025 Planning Commission Agenda Packet 69
APPENDIX B : HOUSING NEEDS ASSESSMENT
This appendix is currently in draft form. The Housing Needs Assessment will be added
to the final document.
August 27, 2025 Planning Commission Agenda Packet 70
APPENDIX C : LAND CAPACITY ANALYSIS MAP
August 27, 2025 Planning Commission Agenda Packet 71
August 27, 2025 Planning Commission Agenda Packet 72
APPENDIX D : PORT ANGELES HOUSING COST BURDEN CHARTS
Household Income as a Percentage of AMI by Tenure in Port Angeles, 2010 and 2020
Source: 2006-2010, 2016-2020 HUD Comprehensive Housing Affordability Strategy (CHAS)
Cost Burdened Households by Tenure in Port Angeles, 2020
Source: 2016-2020 HUD Comprehensive Housing Affordability Strategy (CHAS)
August 27, 2025 Planning Commission Agenda Packet 73
Cost Burden and Household Income in Port Angeles, 2020
Source: 2016-2020 HUD Comprehensive Housing Affordability Strategy (CHAS)
August 27, 2025 Planning Commission Agenda Packet 74
CED Building Report - July 2025
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2024 YTD
0 0 1 0 2 0 1 0 0 0 0 0 2
$0.00 $0.00 $700,000.00 $0.00 $368,722.00 $0.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,291,500.00
4 5 3 9 8 9 8 0 0 0 0 0 64
$352,600.00 $100,636.00 $71,652.00 $193,541.00 $295,571.00 $566,877.00 $141,293.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,754,179.00
0 0 0 0 0 0 0 0 0 0 0 0 2
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,298,130.00
1 0 0 1 0 0 0 0 0 0 0 0 0
$2,632,599.00 $0.00 $0.00 $69,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
0 0 0 0 1 0 0 0 0 0 0 0 1
$0.00 $0.00 $0.00 $0.00 $56,000,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $65,000.00
0 0 0 2 2 0 0 0 0 0 0 0 4
$0.00 $0.00 $0.00 $295,000.00 $726,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $937,000.00
2 0 0 0 0 0 3 0 0 0 0 0 9
$800,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $484,827.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,845,524.00
1 0 1 1 2 0 1 0 0 0 0 0 3
$250,000.00 $0.00 $282,354.00 $240,000.00 $85,000.00 $0.00 $26,680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $554,520.00
2 0 1 2 0 2 2 0 0 0 0 0 6
$718,694.00 $0.00 $120,000.00 $570,860.00 $0.00 $463,742.00 $625,525.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,251,690.00
0 0 3 0 1 1 2 0 0 0 0 0 14
$0.00 $0.00 $282,659.00 $0.00 $94,565.00 $60,000.00 $108,098.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,108,154.00
18 27 35 27 29 28 33 0 0 0 0 0 154
$332,185.00 $318,083.00 $742,902.00 $416,350.00 $265,008.00 $897,274.00 $386,169.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,642,611.00
Comm 2 0 0 1 0 3 0 0 0 0 0 0 9
Res $16,500.00 $0.00 $0.00 $15,000.00 $0.00 $54,380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $76,205.00
30 32 44 43 45 43 50 0 0 0 0 0 268
$5,102,578.00 $418,719.00 $2,199,567.00 $1,800,251.00 $57,834,866.00 $2,042,273.00 $1,774,092.00 $0.00 $0.00 $0.00 $0.00 $0.00 $18,824,513.00
3 0 4 4 4 1 3 0 0 0 0 0 9
$67,450.71 $32,495.68 $59,192.12 $49,188.64 $512,626.80 $49,407.87 $40,688.54 $0.00 $0.00 $0.00 $0.00 $0.00 $413,909.49
000101100000034*5
4 0 0 0 0 0 6 0 0 0 0 0 10 8*16
2 0 1 2 0 2 2 0 0 0 0 0 9 5*6
1 0 1 1 2 0 1 0 0 0 0 0 6 1*3
0 0 0 0 0 0 0 0 0 0 0 0 0 0*4
7 0 3 3 3 3 9 0 0 0 0 0 28 18*34
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
$71,172,346.00
$811,050.36
6
$85,880.00
287
19
$2,498,821.00
7
$545,322.00
197
$3,357,971.00
5
$1,284,827.00
6
$884,034.00
9
$56,000,000.00
4
$1,021,000.00
0
$0.00
2
$2,702,099.00
1
*The pending units are in various stages of staff review. Additionally, not all applicants have submitted a complete application at this time. While we expect the majority to advance through the review process, it is possible that some may experience the need for additional
review.
Dwelling Units - Single Family
Dwelling Units-Manufactured Home
Dwelling Units - Multi Family (3+)
Total Dwelling Units
Transitional Housing Units
Repair and Alteration
Total Permits Issued
Total Construction Valuation
2025 YTD
Dwelling Units - Duplex
New Construction
Repair and Alteration
New Multi Family
New Manufactured Home
Dwelling Units - ADU
Demolition and Moving
Certificate of Occupancy
4
$1,070,222.00
46
$1,722,170.00
Permit Fees Paid
Comm
Ind
Public
Res
New Construction
Repair and Alteration
New Construction
New Single Family
New Accessory Structure
Repair and Alteration
August 27, 2025 Planning Commission Agenda Packet 75
CED Affordable Housing Report - July 2025
Type JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2025 YTD 2024 YTD
SUT - HB 1406 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40,000.00
SUT - HB 1590 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50,000.00 $14,999.00
FWP $39,666.66 $0.00 $17,444.82 $0.00 $6,676.43 $24,153.35 $25,750.54 $0.00 $0.00 $0.00 $0.00 $0.00 $113,691.80 $144,704.67
NICE- Small Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5,810.39
NICE - Medium
Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
NICE - Large Scale $0.00 $0.00 $0.00 $0.00 $0.00 $46,750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $46,750.00 $0.00
TOTAL CITY
INVESTMENTS $39,666.66 $50,000.00 $17,444.82 $0.00 $6,676.43 $70,903.35 $25,750.54 $0.00 $0.00 $0.00 $0.00 $0.00 $210,441.80 $205,514.06
PRP 3 1 0 0 3 2 0 0 0 0 0 0 9*10
MFTE 0 0 0 0 0 4 0 0 0 0 0 0 4*12
Key
SUT- HB 1406
SUT- HB 1590
FWP
NICE - Small Scale
NICE - Medium Scal
NICE - Large Scale
PRP
MFTE
Multi Family Tax Exemption. Contracts are shown in the month they were executed between developer and City, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the
monthly Building Report.*
Please Note: City staff invest considerable time to proactively engage with prospective housing developers in order to amplify these critical City programs. This report only includes one stage of this important process.
Fee Waiver Program. The costs of 25 permit types are waived by the City for all infill and multifamily housing projects.
New Improvements for Community Enhancement of Neighborhoods Projects (≤ $14,999). Grants are shown in the month that the contract was fully executed between the developer and the City.
Sales and Use Tax - HB 1406. Grants are shown in the month that the contract was fully executed between the developer and the City.
Sales and Use Tax - HB 1590. Grants are shown in the month that the contract was fully executed between the developer and the City.
New Improvements for Community Enhancement of Neighborhoods Projects ($15,000-$24,999). Grants are shown in the month that the contract was fully executed between the developer and the City.
New Improvements for Community Enhancement of Neighborhoods Projects (≥ $25,000). Grants are shown in the month that the contract was fully executed between the developer and the City.
Permit Ready Plans. Plans are shown in the month they were shared with prospective developer, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the monthly
Building Report.*
August 27, 2025 Planning Commission Agenda Packet 76
2025 Q2
CED Grant Report
August 27, 2025 Planning Commission Agenda Packet 77
CED Grant Report 2025 Q2
ACTIVE GRANTS
Parking and Business Improvement Area (PBIA) & Port Angeles
Waterfront District (PAWD)
Grant: $25,293.57 distributed for Q1; awaiting Q2 total to be distributed by the Finance
Department.
Source: PBIA Funds
Contract Number: N/A
Partners: Port Angeles Waterfront District
Status: Approved by City Council on December 3rd, 2024. Contract executed on December 17th,
2024.
Contractor: N/A
Q2 Deliverables:
•PAWD reporting demonstrated the following:
o Encouragement and promotion of economic development in the waterfront
district area including the work of the Economic Vitality Committee.
o Strengthening and revitalizing commerce in the waterfront district area.
o Working on enrollment in the Washington Main Street Program with a final
application to be submitted in Q3.
o Sponsoring and promoting public events in the waterfront district area including
Welcoming Vista Work Parties, Plucking Posse Work Parties, and maintaining and
updating social media to reflect current happenings in the waterfront district area.
o Facilitating discussions with City staff regarding Lot B and potential PBIA
expansion.
o Participation in Comprehensive Plan Periodic Updates as part of the Stakeholder
Advisory Committee.
o Maintaining and updating the PBIA database.
August 27, 2025 Planning Commission Agenda Packet 78
Clallam County Economic Development Council
Grant: $20,000
Source: General Fund
Contract Number: N/A
Partners: Clallam County Economic Development Council
Status: Contract period is January 1st, 2025 – December 31st, 2025
Contractor: N/A
Q2 Deliverables:
•Three business contacts initiated: site selector interactions & recruitment activities
including a sawmill, biogenic material manufacturer, and a modular home manufacturer.
•17 existing businesses signed up for support appointments to help local business owners
solve problems, grow, and thrive.
•Provided startup assistance to five new businesses.
•Hosted four trainings, workshops, or events that helped over 30 local businesses.
Accelerating Procurement Excellence (APEX) Accelerator
Grant: $10,000
Source: General Fund
Contract Number: N/A
Partners: Accelerating Procurement Excellence (APEX) Accelerator
Status: Contract period is January 1st, 2025 – December 31st, 2025
Contractor: N/A
Q2 Deliverables:
•Hosted one community presentation, two workshops and two recruitment events.
•Provide support to 34 Clallam County Businesses to help them succeed in the
government marketplace.
•Remainder of 2025 will focus on cybersecurity maturity model certification, HUBZone
certifications, more in-person events for contractors and local agency staff, and
emergency/disaster rolodex.
August 27, 2025 Planning Commission Agenda Packet 79
Lodging Tax Annual Fund Allocation
Grants: $1,437,556
Source: Loding Tax Funds
Contract Number: N/A
Partners: Please see the ‘Deliverables to Date’ section below.
Status: All awardees from the December 2024 approval have contracts that are fully executed.
Additional funds were approved at the 4/1 City Council meeting and are now included in the Q2
quarterly report. Staff continually disburse funds as reimbursement requests come in.
Contractor: Lodging Tax funds are used to support the following annual contracts and expenses:
•Port Angeles Regional Chamber of Commerce – Visitor Center Operations: $122,342
•LuLish Design – Destination Marketing Campaign: $210,000
•City of Port Angeles ROW Coverage Costs – NTE $10,000
•City of Port Angeles Staff Expenses for LTAX Related Work – $55,824
Q2 Deliverables:
Organization Name Amount Awarded
The Loom, LLC $1,300
N-Dub Productions, LLC $22,500
Port Angeles Arts Council $8,550
Olympic Peninsula Rowing Association $5,000
The Hubbub, LLC $8,920
Peninsula Adventure Sports $9,000
123 West Design Collective $9,300
GOPA LLC $10,000
Port Angeles Waterfront District $42,000
The Dungeness Crab Festival $10,000
Olympic Peninsula Fungus Festival, LLC $10,000
Concerts on the Pier $10,000
Juan de Fuca Foundation for the Arts $10,000
Port Angeles Marathon Association $29,000
Community Boating Program $20,140
Peninsula Trails Coalition $49,500
Hurricane Ridge Winter Sports Educational Foundation $39,680
Olympic Peninsula Tourism Commission $60,000
August 27, 2025 Planning Commission Agenda Packet 80
Port Angeles Fine Arts Center $150,000
Lincoln Park BMX Association $49,500
City of Port Angeles, Parks & Rec. $120,000
Port Angeles Waterfront Center $250,000
North Olympic Baseball and Softball $25,000
Port Angeles Youth Basketball $90,000
Total Amount Awarded to date $1,039,390
Affordable Housing Programs
Grants: $184,691.26
Source: $50,000.00 in Sales and Use Tax funds, $87,941.26 in Fee Waivers, and $46,750.00 in
NICE funds
Contract Number: N/A
Partners: Please see the ‘Deliverables to Date’ section below.
Contractor: N/A
Q2 Deliverables:
Fee Waiver Program Grants
•The City waived $30,829.78 in building, land use, fire, engineering, and public works
fees for four eligible residential projects.
New Improvement and Community Enhancement (NICE) Neighborhood Grants
•$46,750.00 to Sam Watson and Marianne Condrup, NICE No. 25-0066
Façade Grant Program
Grants: $28,000.00
Source: $68,726.15 CDBG program income funds.
Contract Number: N/A
Partners: Please see the ‘Deliverables to Date’ section below.
Contractor: N/A
Q2 Deliverables:
August 27, 2025 Planning Commission Agenda Packet 81
•$8,000.00 – The Hubbub LLC – 117 N Lincoln St. for restoration work on all four
facades.
•$10,000.00 – Turella Oral Surgery – 902 E 8th St. for restoration work on all four
facades.
•$10,000.00 – Coastal Health – 621 E Front St. for replacement of windows.
CLOSED GRANTS
GMA Periodic Update
Grant: $125,000 ($62,500 received in June 2024 and $62,500 received in June 2025)
Source: Washington State Department of Commerce
Contract Number: 24-63335-003
Partners: N/A
Status: Contract executed July 1st, 2023; closed June 30th, 2025
Contractor: MAKERS Architecture and Urban Design, LLP
Q2 Deliverables:
•Updated land-use map.
•External stakeholder advisory committee meetings.
•Internal steering committee meetings.
•State Environmental Policy Act (SEPA) Scoping Open House on April 17, 2025.
•First draft of the updated Comprehensive Plan available for public input.
•Draft Comprehensive Plan Open House on June 12, 2025.
•Neighborhood walks on June 13, 2025, and a neighborhood survey was made available
through the month of June.
2023 – 2025 Climate Planning
Grant: $150,000 ($87,200 received in February 2025; $62,800 received in June, 2025)
Source: Washington State Department of Commerce
Contract Number: 24-63610-149
Partners: N/A
Status: Contract executed July1, 2023; closed June 30, 2025
August 27, 2025 Planning Commission Agenda Packet 82
Contractor: MAKERS Architecture and Urban Design, LLP
Q2 Deliverables:
•Audit of existing comprehensive plan for climate-related elements.
•Contribution of $60,000 to the Multi-Agency Interlocal Agreement for Hazard Mitigation
and Climate Planning for the development of a multi-jurisdictional hazard mitigation plan,
led by Clallam County.
•Integration of the MJHMP, Climate Resiliency Plan, and Implementation Plan into the draft
Hazard Mitigation and Climate Resiliency Element.
•First draft of the Hazard Mitigation and Climate Resiliency Element.
August 27, 2025 Planning Commission Agenda Packet 83