HomeMy WebLinkAboutPC Regular Meeting Agenda Packet- 202551022REGULAR MEETING AGENDA
PLANNING COMMISSION
October 22, 2025
6:00 - 8:00 PM
Notice is hereby given that the Port Angeles Planning Commission will meet on Wednesday,
October 22, 2025 starting at 6:00 p.m. in the City Council Chambers in City Hall, located at 321
E. 5th Street, Port Angeles, WA. This meeting will be conducted as a hybrid meeting. In hybrid
meetings, members of the public, Committee members, and City staff have the option to attend the
meeting in person at City Hall or remotely through the Webex virtual meeting platform. For those
planning to attend remotely, learn how to watch the meeting live and participate during the public
comment period by visiting: https://www.cityofpa.us/Live-Virtual-Meetings
For audio only, please call: 1-844-992-4726
Use access code: 2552 010 1220
Webinar password: PC10222025 (72102220 when dialing from a phone or video system)
Once connected press *3 to raise your virtual hand, if you wish to make a comment or public
testimony. You will be notified when it is your turn to speak. This access code will work for the
October 22, 2025 meeting only.
If you are joining the meeting through the Webex link and wish to make a comment or provide
public testimony, please use the “raise your hand” feature in Webex. You will be notified when it
is your turn to speak.
Virtual Webex Meeting Link:
https://cityofpa.webex.com/cityofpa/j.php?MTID=m67b4bd7e4aa5cca7361694111f0520d0
The meeting is open to the public.
I.CALL TO ORDER
II.ROLL CALL
III.PUBLIC COMMENT
IV.APPROVAL OF MINUTES
Minutes of the September 24, 2025 and October 1, 2025 Meetings
V.ACTION ITEMS
1.Action: Public Hearing for Vision 2045 Comprehensive Plan Periodic Update
(CPA 25-0004). Public hearing and Planning Commission recommendation to City
Council for the Comprehensive Plan Periodic update.
2.Action: Public Hearing for Citywide Rezone associated with the Comprehensive
Plan Periodic Update (REZ 25-0153). Public hearing and Planning Commission
recommendation to City Council for the Citywide rezone associated with the
Comprehensive Plan Periodic update.
3.Action: Public Hearing for 2025 Housing Action Plan Periodic Update (CPA
25-0112). Public hearing and Planning Commission recommendation to City Council
for the draft Housing Action Plan amendment.
VI.STAFF UPDATES
1.Monthly Building Report
2.Monthly Affordable Housing Report
3.Monthly Natural Resources Report
4.Monthly Land Use Permitting Report
VII.REPORTS OF COMMISSION MEMBERS
VIII.PUBLIC COMMENT
IX.ADJOURNMENT
PLANNING COMMISSION MEETING
Port Angeles, Washington
September 24, 2025
This meeting was conducted as a hybrid meeting.
CALL TO ORDER - REGULAR MEETING
Chair Young called the regular meeting of the Port Angeles Planning Commission to order at 6:02 p.m.
ROLL CALL
Planning Commission Chair Young, Vice Chair Steiger, Commissioners: Stanley, Mellema (virtual),
McMillian, Kiedrowski (virtual).
Members Absent: Schorr (excused)
Staff Present: Community and Economic Development Director Shannen Cartmel, Planning Supervisor
Ben Braudrick, Associate Planner Angel Torres, Housing Administrator Jalyn Boado, Natural Resources
and Grant Administrator Courtney Bornsworth, and Building Inspector and Short-Term Rentals
Administrator Chris Jackson.
PUBLIC COMMENT
None Given
APPROVAL OF MINUTES
Action Item: Approval of Minutes
It was moved by Vice Chair Steiger and seconded by Commissioner Stanley to:
Approve the minutes of the August 27th, 2025, Meeting with the correction of the spelling of Vice Chair
Steiger’s name.
Motion carried 5-0.
ACTION/DISCUSSION ITEMS
1. Public Hearing and Planning Commission Action: Municipal Code Amendment 25-
0124 Co-living Housing Title 17 Code Revisions. Amendments to Chapters 17.08, 17.10,
17.11, 17.12, 17.14, 17.15, and 17.20 PAMC to include co-living.
Public Hearing Comment Period was opened by Chair Young at 6:04 PM.
Public Hearing/Comments - None Given
Public Hearing Comment Period was closed at 6:14 PM by Chair Young.
Discussion followed.
It was moved by Vice Chair Steiger and seconded by Commissioner McMillian to:
CITY OF PORT ANGELES PLANNING COMMISSION – September 24, 2025
Page 2 of 3
Recommend that City Council adopt the Municipal Code Amendment 25-0124 revisions to Title
17, adding a co-living housing definition and listing co-living housing as a permitted use in R7,
R9, R11, RMD, RHD, CO, CN, CA, CBD, and CSD zones.
Motion carried 6-0.
2. Discussion: Draft Housing Action Plan
Commission discussion of the draft Housing Action Plan.
3. Discussion: Comprehensive Plan and Housing Action Plan Public Comment Review
Staff presentations of public comments received and responded to regarding the
Comprehensive Plan and Housing Action Plan periodic updates. Commission discussion
followed.
4. Discussion: UGA Swap
Staff presentation on the reconfigured UGA phasing and joint pending UGA swap by
the City and County. Commission discussion followed.
STAFF UPDATES
Monthly Building Report
Building Inspector/Licensing Administrator Chris Jackson gave a brief comparison of the
monthly building report to last year's monthly report.
Monthly Affordable Housing Report
Planner Boado gave a brief update about affordable housing programs.
Monthly Natural Resources Report
Planner Bornsworth gave a brief update on the City Shade Street Tree Program and the DNR
Kelp and Eelgrass working group.
Monthly Land Use Permitting Report
Planner Braudrick gave a brief update on current land use permitting in the City.
Draft SEPA EIS Update
Planner Braudrick gave a brief update on the Draft SEPA EIS for the comprehensive plan
updates.
COMMISSIONER REPORTS
Chair Young, none given.
Vice Chair Steiger, working with Nancy Stephens and her home-sharing/Nesterly, and her
engagement with Representative Adam Bernbaum.
CITY OF PORT ANGELES PLANNING COMMISSION – September 24, 2025
Page 3 of 3
Commissioner Schorr, none given.
Commissioner Stanley, the most developable site in the city is the City’s airport. It could satisfy
all the City’s housing and industrial needs, and more.
Commissioner Kiedrowski asked if PAAR clarified why they are not in support of infill housing.
Would like a presentation from someone in Public Works about their perspective on how these
updates to the comprehensive plan work on the ground.
Commissioner Mellema, none given.
Commissioner McMillian, appreciated that the community has had the ability to comment on the
permit-ready plans.
SECOND PUBLIC COMMENT
None given.
ADJOURNMENT
Commissioner Stanley motioned to adjourn the meeting at 7:51 p.m.
Commissioner Kiedrowski seconded the motion.
The meeting was adjourned by Chair Young at 7:51 p.m.
_____________________________________ _______________________________
Colin Young, Chair Jalyn Boado, Secretary
PLANNING COMMISSION MEETING
Port Angeles, Washington
October 1, 2025
This meeting was conducted as a hybrid meeting.
CALL TO ORDER - SPECIAL MEETING
Chair Young called the regular meeting of the Port Angeles Planning Commission to order at 6:05 p.m.
ROLL CALL
Planning Commission Chair Young, Vice Chair Steiger (Remote), Commissioners: Kiedrowski, Mellema (Remote).
Members Absent: Commissioner McMillan
Members with Excused Absence: Commissioner Schorr and Commissioner Stanley
Staff Present: Community and Economic Development Director Shannen Cartmel, Planning Supervisor Ben
Braudrick, Associate Planner Angel Torres, Housing Administrator Jalyn Boado, Natural Resources and Grant
Administrator Courtney Bornsworth.
PUBLIC COMMENT
John R., Resident, is concerned that the sidewalk fee-in-lieu will be reviewed by the Utilities Commission before
approval by the City Council. He also had concerns regarding the city-wide rezone.
AGENDA ITEMS
1.Public Hearing: State Environmental Policy Act Draft Environmental Impact Statement (EIS) Alternatives. Public
hearing for the Draft SEPA EIS Alternatives associated with the Vision 2045 Comprehensive Plan Periodic
Update
Susie Blake: Questions about density changes north of Laurdisen and South of 8th Street. Why is part of this area
zoned as high density, but not the surrounding areas? What does medium-high density mean for people who own
single-family residences? Discussed pedestrian safety, traffic circles, and traffic calming in the appropriate places.
John Ralston: Also concerned about SFRs in areas rezoned as high-density or mixed-use. What will happen if there is
a catastrophic event? There needs to be revisions to where folks can rebuild SFRs—also, concerned about
roundabouts.
Commissioner Kiedrowski, it is essential to be able to rebuild SFRs in areas that are rezoned to medium-high density.
Prefers SEPA EIS alternative two better because it allows for more density. Also agrees with rezoning the area between
Lauridsen and 8th Street to be medium-high density zoning. The highest and best use for a vacant lot is a single-family
residence or four units on a lot.
Vice Chair Steiger, could you explain how financing relates to rezoning? Why are there carve-outs for specific areas
(they were rezoned a couple of years ago and will remain that way in our plan)? Prefers alternative two.
Chair Young: Sections between Cherry and Peabody Creek should also be included in the medium to high-density
zoning. Is in favor of both alternatives two and alternative three but leans towards alternative three.
CITY OF PORT ANGELES PLANNING COMMISSION – October 1, 2025
Page 2 of 2
COMMISSION REPORTS
None given.
SECOND PUBLIC COMMENT
None.
ADJOURNMENT
Chair Young motioned to adjourn the meeting at 6:33 p.m.
Commissioner Kiedrowski seconded the motion.
Adjournment was passed unanimously.
Colin Young, Chair Jalyn Boado, Secretary
CPA 25 -0004 Exhibit 1 – Staff Report
Page 1
EXHIBIT 1
DATE: October 22, 2025
TO: Planning Commission
FROM: Planning Division
RE: Comprehensive Plan Periodic Update Staff Report
I. SUMMARY
The City of Port Angeles' 2025 Comprehensive Plan Periodic update is led by the required
Washington State Growth Management Act, RCW 37.70.A, B, and C. The update is required once
every 10 years.
The Port Angeles Comprehensive Plan is a collection of broad community-driven statements about
our values and vision for Port Angeles’ future. This vision focuses on the orderly and coordinated
physical development of the City over the next 20 years. This state-mandated update is due by
December 31, 2025.
This periodic update of comprehensive plans and specific development regulations ensures that
they are consistent with:
• Recent changes to state law,
• Updates to countywide planning policies, and
• Population and demographic changes, infrastructure needs, and investments.
The periodic update includes a review of the city’s zoning policies and urban growth area (UGA) to
ensure sufficient land is available to accommodate projected housing needs and employment
growth over the next 20 years.
The Plan is divided into an introduction and vision statement, nine elements, each with a
background, goals, and policies, and an appendix that provides the analyses performed for the
update. The Plan itself focuses on the following key issues:
• Housing accessibility and equity;
• Local economic development, business establishment and retention, and employment
opportunities;
• Future land use mapping and zoning practices;
• Utility development and ongoing maintenance;
• Park and recreation access;
• Neighborhood services;
• Environmental protection and climate resiliency; and
• Transportation access and continuity
CPA 25 -0004 Exhibit 1 – Staff Report
Page 2
II. CHANGES PROPOSED IN THE PLAN
This periodic update involves significant revisions to the Comprehensive Plan to better align the
community with its new 20-year vision for land use, economic development, housing, and the
quality of life of its residents. The Plan seeks to demonstrate the ability to accommodate a
projected 3150 new residents, 1,970 housing units, and 967 new jobs.
Vision and Plan Introduction
Revisions to the introduction include updates to the Vision and Value Statements, new guidance on
using a comprehensive plan, and next steps for implementing the plan.
Land Use Element
The land use element has been significantly updated to better align land use goals and policies with
other elements, incorporating many goals and policies from the removed Growth Management
Element. The future land use map has been updated with new designations that correlate with the
current zones used by the City, demonstrating that Port Angeles can accommodate the projected
growth of 3,150 new residents by 2045. The needs of the Urban Growth Areas (UGAs) have been
addressed, and preparation has been made for a future UGA swap with Clallam County in the
Western UGA.
Housing Element
The housing element was changed to clarify data in the housing needs assessment and the racially
disparate impacts analysis. Since the last rendition of the comprehensive plan, the City has
implemented multiple affordable housing programs. The updated Housing Element provides
information about the implementation and success of the affordable housing programs. Likewise,
goal H–5 was also amended for clarity’s sake.
Economic Development Element
The updated Economic Development element includes many new policies. The Economic
Development Element looks at creating more spaces and incubators. It also has a new policy to
explore tax incremental financing. The new Economic Development element provides goals and
policies that speak to the work being done at the Clallam County Economic Development Council,
like recompete and the APEX accelerator program. In addition, there will be language added to
encourage more industrial zoning through a UGA swap with Clallam County.
Parks, Recreation, & Open Space Element
The Parks, Recreation & Open Space Element has been updated to better address forecasted
needs for the City of Port Angeles. It includes maintenance and upgrades to existing infrastructure
and addresses aging facilities to ensure safety and functionality. Goals and policies reflect the need
to provide equitable access to outdoor spaces for all residents, enhancing the community's quality
of life. Tree preservation and ease of access to open spaces closely relate to goals and policies
found elsewhere in the plan, specifically in the Conservation and Hazard Mitigation & Climate
Resiliency Elements.
CPA 25 -0004 Exhibit 1 – Staff Report
Page 3
Conservation Element
Updates to the Conservation Element were based on input from community members throughout
the visioning process. Community members' priorities included waste reduction and recycling
programs, water conservation efforts, tree planting initiatives, expanding urban green spaces, and
improving the City's infrastructure to be more resilient to climate change. Goals and policies were
added to reflect these priorities, guiding future conservation efforts throughout Port Angeles.
Planned updates before adoption include adding new policies pertaining to the investigation of
various models for timberland stewardship and maintaining the City’s Tree City USA Designation.
Hazard Mitigation & Climate Resiliency Element
The Hazard Mitigation & Climate Resiliency Element is a new element that combines existing
climate resiliency goals and policies from previous amendments with new goals and policies to
enhance the community’s overall resiliency to climate stressors and natural hazards. It prioritizes
focusing on healthy ecosystems, increasing tree canopy city-wide, and promoting mitigation
measures that contribute to a more sustainable, resilient community. This is crucial as the
community continue to prepare for periods of prolonged drought, wildfires and wildfire smoke,
landslides, earthquakes, and tsunamis.
Transportation Element
The Transportation Element has changes based upon a comprehensive analysis of the City’s
existing network and emphasizes multimodal connections, accessibility, and safety. It also sets
priorities for investments and aligns with state requirements.
Capital Facilities Element
The Capital Facilities Element provides an inventory of existing facilities, a new level of service, and
forecasts needs. It also includes equity statements to ensure that facilities are provided and
maintained in a way that benefits the wider community, not just specific demographic segments.
Utilities & Public Services Element
The Utilities & Public Services Element has been reorganized to improve structure and consistency
across related infrastructure goals and policies. City-managed systems, including water,
wastewater, stormwater, solid waste, and electricity, have been consolidated into the Capital
Facilities Element to better coordinate planning, funding, and service capacity. The element now
focuses on privately and regionally provided services, such as telecommunications, and introduces
a new broadband inventory and policies that emphasize equitable access, reliability, and resilience
for all residents.
III. PROCEDURE
The Comprehensive Plan is a twenty-year plan first adopted in accordance with the Growth
Management Act in 1994. State law requires municipalities fully planning under the GMA to update
the Plan every ten years. Port Angeles is required to complete the periodic update by adopting the
Plan before December 31, 2025. Public Engagement for the update kicked off in June 2024. During
this time, the engagement consisted of:
CPA 25 -0004 Exhibit 1 – Staff Report
Page 4
• Public Newsflashes on the City’s website.
• Notices and calls for engagement and planning exercises that were mailed in two separate
citywide utility billing statements.
• A publicly available 3-day storefront studio with three separate workshops.
• A visioning survey online and through the mail.
• A Stakeholder Advisory Committee that met six times over the course of the engagement
process.
• An open house associated with the publishing of the first draft of the plan.
• Discussions held on two occasions with Todd Orloff on KONP.
• A digital survey associated with the published draft Plan to collect public comments on
each element.
• Presentations to various boards and commissions of local non-profit, business, and
philanthropic organizations and interest groups.
• Presentations and discussion with the Planning Commission for each element of the draft
Plan.
• A work session on the second draft of the Plan with the City Council.
This comprehensive engagement program resulted in thousands of comments, hundreds of
housing stories, and a mailing list of over 700 community members interested in continuing the
engagement process and providing feedback. Overall, it offered community-led direction to
address the challenges and opportunities that Port Angeles will face over the next 20-year planning
period. Exhibit 2 of this staff report is the Public Comment Memo, which comprehensively
addresses the public engagement process.
Notice of the October 22, 2025, public hearing was published in the Peninsula Daily News on
September 24, 2025, at City Hall, on the City’s website, and sent to local stakeholders to solicit
public comments on the proposed changes.
On October 22, 2025, the Planning Commission will hold a public hearing on CPA 25-0004 and
make a recommendation to the City Council. City Council will consider adoption of the 2025
Comprehensive Plan by December 31, 2025. An appeal must be submitted to the City of Port
Angeles within 21 days of the notice of final decision.
IV. COMMENTS
Public Comment
See Exhibit 3, Public Comment Memo, for a comprehensive review of public comment received
during the periodic update public engagement process.
City of Port Angeles Departmental Comments
Comments received from the City of Port Angeles Departments have been incorporated into the
draft Comprehensive Plan.
CPA 25 -0004 Exhibit 1 – Staff Report
Page 5
V. FINDINGS OF FACT & STAFF ANALYSIS
The analysis and findings of fact from the Department of Community and Economic Development
(DCED) staff are based on the draft plan materials, the Port Angeles Municipal Code (PAMC),
relevant standards, plans, public comments, and other available materials during the review
period. The findings and analysis section within this report is a summary of the completed review by
DCED staff.
Port Angeles Municipal Code
The following PAMC provisions are seen as relevant to this application. The Planning Staff provides
comments under each provision to demonstrate the analysis conducted during the application
review process and the findings of fact pertinent to the plan.
Title 18 – Administration and Personnel
Per PAMC Section 18.02.050, the City Council has the authority to review and is authorized and
directed to hear and decide on Type V permit applications.
Staff Analysis: A Comprehensive Plan periodic update requires a public hearing before the Planning
Commission. The recommendation to the City Council is based on the draft plan, comprehensive
public comments, the Port Angeles Municipal Code, and information available during the public
engagement process. Such a decision may be appealed to the Superior Court, provided that the
appeal is filed within 21 days of the City Council's decision, as per Chapter 36.70C RCW. If an
appeal is not filed within the applicable period, the City Council's decision is the final decision of
the City. A timely appeal of any City Council decision will stay all further proceedings by the
Department of Community and Economic Development, specifically related to the periodic update
under appeal.
Environmental Review
The City of Port Angeles is currently undergoing a SEPA Draft Environmental Impact Statement
(DEIS) 30-day public comment period under WAC 197-11-455. The comment period is from
September 18 through October 18, 2025. The environmental impacts of the proposed non-project
action are being considered in the DEIS. A Final EIS (FEIS) will be issued within 60 days of the end of
the public comment period for the DEIS per the requirements of WAC 197-11-460. Any interested
parties may submit written comments during the 30-day public comment period, addressed to the
Department of Community & Economic Development (DCED). The comment period closes on
October 18, 2025.
Consistency
In preparation and submission of the Comprehensive Plan Periodic Update, the applicant has
demonstrated that all standards can be met in accordance with the City’s Comprehensive Plan and
CPA 25 -0004 Exhibit 1 – Staff Report
Page 6
the Port Angeles Municipal Code. Conditions placed on the permit in Section VII of this report
ensure those standards will be demonstrated in the future.
VI. CONCLUSIONS AND STAFF RECOMMENDATION
Having reviewed and considered the staff report, application materials, public comments, and all
the information presented, the City Planning Division recommends approval of Comprehensive
Plan Amendment No. 25-0004 for a periodic update to the Comprehensive Plan, and makes the
following conclusions:
1. Analysis and findings of fact from Staff are based on the entirety of the periodic update
materials, municipal code, City standards, plans, public comment, and all other materials
available during the review period. Collectively, the information contained in the staff report
is the record of the review. The analysis and findings section of this report is a summary of
the complete City Staff review and the specific findings of fact.
2. Per Section 2.36.010 of the Port Angeles Municipal Code (PAMC), the Planning Commission
advises on all matters relating to land use planning and comprehensive planning. The
Commission may make recommendations on ways to enhance Community and Economic
Development Department's community relations; review and make recommendations
concerning Community and Economic Development Department policies, procedures,
programs, and standards; make recommendations on how to promote public awareness of
the Community and Economic Development Department services and programs; and
review and make recommendations regarding legislative changes affecting Community and
Economic Development Department services in Port Angeles.
3. The City Council has review authority and is authorized and directed to hear and decide on
Comprehensive Plan Amendments. As to all the foregoing issues and matters, the decision
of the City Council shall be the final decision of the City. Such a decision may be appealed
to the Superior Court, provided that the appeal must be filed with the City within 21 days
after the Director issues the decision. An appeal application for any decision of the Director
shall stay all further proceedings by the Department of Community and Economic
Development specific to the property under appeal.
Staff Recommendation
Staff recommends that the Planning Commission forward a recommendation of approval for the
2025 Comprehensive Plan Periodic Update to the City Council, incorporating any requested
changes by motion.
VII. ADDITIONAL EXHIBITS
Exhibit 2: Draft Comprehensive Plan Volume I (Vision, Goals, and Policies)
Exhibit 2: Draft Comprehensive Plan Volume II (Appendices and Analyses)
Exhibit 3: Public Comment Memo
CPA 25 -0112 Housing Action Plan Exhibit 1 – Staff Report Page 1
DATE: October 22, 2025
TO: Planning Commission
FROM: Jalyn Boado, Associate Planner - Housing Administrator
SUBJECT: Housing Action Plan Comprehensive Plan Amendment No. 25-0112
EXHIBIT 1: STAFF REPORT
I. SUMMARY
The City of Port Angeles' 2025 Housing Action Plan (HAP) is an updated strategy that builds upon
the 2019 plan. This initiative aims to tackle critical housing challenges and promote a fair, diverse,
and sustainable housing future for Port Angeles. The 2025 HAP Periodic Update identifies housing
challenges, summarizes the housing needs assessment, outlines goals for the next ten years, and
analyzes progress in achieving these goals since 2019. The Housing Action Plan also outlines 11
new housing tasks to be accomplished within the next ten years. By addressing these pressing
issues and following a clear plan, Port Angeles seeks to create a more inclusive and resilient
housing landscape for years to come.
II. CHANGES PROPOSED IN THE PLAN
The proposed amendments to the 2019 Housing Action Plan are intended to update and align the
tasks laid out in the 2025 Comprehensive Plan Periodic Update to the current housing and
employment needs:
The HAP provides a summarized Housing Needs Assessment from the 2025 Comprehensive Plan,
including a community profile, workforce profile, housing supply analysis, gap analysis, land
capacity analysis, racially disparate impact analysis, and a Point-In-Time count.
The HAP provides eleven housing development tasks, including:
• Blighted property reduction strategy,
• Weatherization and repair programs,
• Permit Ready Plans,
• Affordable Housing Grants,
• Fee Waiver Program,
• Multifamily Builders Training,
• City-wide housing instability advocate,
CPA 25 -0112 Housing Action Plan Exhibit 1 – Staff Report Page 2
• Multifamily housing pipeline project,
• Co-living Housing Municipal Code Update,
• Multifamily Property Tax Exemption, and
• Community Land Trusts
III. PROCEDURE
The Housing Action Plan is a ten-year plan first drafted in 2019. To align the HAP with the state-
required Comprehensive Plan Periodic Update process, it is being revised concurrently with the
procedures and engagement strategies.
Notice of the October 22, 2025, public hearing was published in the Peninsula Daily News on
September 24, 2025, at City Hall, on the City’s website, and sent to local housing partners and
stakeholders to solicit public comments on the proposed changes. Public comment related to the
draft HAP can be found in Exhibit 2 to this staff report.
On October 22, 2025, the Planning Commission will hold a public hearing on CPA 25-0112 and
make a recommendation to the City Council. City Council is scheduled to consider the adoption of
the 2025 Housing Action on December 16, 2025. An appeal must be submitted to the City of Port
Angeles within 21 days of the notice of final decision.
IV. COMMENTS
Public Comment
See Exhibit 3, Public Comment Memo for a comprehensive review of public comment provided to
date.
City of Port Angeles Departmental Comments
Comments received from the City of Port Angeles Departments have been incorporated into this
report’s findings and conditions.
V. FINDINGS OF FACT & STAFF ANALYSIS
The following analysis and findings of fact from the Department of Community and Economic
Development (DCED) staff are based on the Comprehensive Plan Goals and Policies.
City of Port Angeles Comprehensive Plan
All CPA applications must be consistent with the Port Angeles Comprehensive Plan. Planning Staff
identifies the following draft Port Angeles Comprehensive Plan policies associated with the
concurrent periodic Update of the Comprehensive Plan to support the proposal in CPA Application
No. 25-0112:
Land Use Element
CPA 25 -0112 Housing Action Plan Exhibit 1 – Staff Report Page 3
Goal LU-3: Residential Neighborhoods and Housing Stock. Expand the quantity and diversity of
housing options for all types of households while enhancing neighborhoods’ quality of life and
environmental compatibility.
Staff Analysis: Land Use Goal LU-3 addresses several aspects of the Housing Action Plan (HAP).
These include providing a range of housing types for all income levels, promoting high-density infill
development, allowing mid-rise housing options, and encouraging co-living arrangements. The HAP
is guided by data from the Housing Needs Assessment, which analyzes the types and income levels
of housing needed in Port Angeles. Additionally, projects such as the fee waivers and the multifamily
housing pipeline pilot project are part of this.
Housing Element
Goal H-1: Housing Supply. Provide a sufficient supply, variety, availability, and attainability of
housing to meet community needs.
Staff Analysis: The HAP offers detailed information about Port Angeles’ current housing supply and
forecasts the housing requirements for the next 20 years. Housing initiatives such as the fee waiver
program, permit-ready plans, the multifamily housing pipeline pilot project, and training for
multifamily builders will support increasing the housing stock in Port Angeles.
Goal H-2: Housing Affordability and Access. Reduce disparities in housing access and mitigate
displacement impacts to vulnerable communities.
Staff Analysis: Affordability and access to housing are key themes of the Housing Action Plan. Along
with the Housing Needs Assessment, there is also an analysis of the Clallam County Point-In-Time
count, which illustrates the fluctuation in the homelessness population from year to year. The
housing tasks section promotes affordability and access through initiatives such as affordable
housing grants, the multifamily property tax exemption, co-living housing, housing instability
advocacy, and community land trusts.
Goal H-3: Housing Quality. Encourage the design, construction, and maintenance of housing to
keep homes in good condition.
Staff Analysis: Over half of the housing in Port Angeles is more than 50 years old. The quality of
housing is a key part of the housing needs assessment, which considers the average age of homes
and how family size relates to the size of units needed. Additionally, there is an effort to expand the
City’s weatherization and energy rebates program and to apply for grants that support essential
housing repairs.
Goal H-4: Collaboration for Affordable Housing. Partner with Clallam County, Peninsula Housing
Authority, and other entities and programs to increase the economic diversity of the housing supply.
CPA 25 -0112 Housing Action Plan Exhibit 1 – Staff Report Page 4
Staff Analysis: The Housing Action Plan addresses various housing partnerships, like working with
the North Peninsula Builders Association and Peninsula College on a multifamily builders training,
making sure the housing instability advocate coordinates with the organizations doing coordinated
entry, and partnering with the Clallam County Habitat for Humanity to tackle housing repairs and
blighted properties. The City of Port Angeles also actively participates in the Housing Solutions
committee and does bi-yearly check-ins with partners like Peninsula Housing Authority, Peninsula
Behavioral Health, Serenity House, The Answer for Youth, Sarge’s Veteran Support, Port Angeles
Association of Realtors, and the North Peninsula Builders’ Association.
Goal H-5: Use the Housing Action Plan as a guide and implementation tool for City actions on
development regulations, funding, and programs.
Staff Analysis: The amended Housing Action Plan provides and prioritizes eleven separate
implementation actions over the next ten-year planning cycle.
Port Angeles Municipal Code
The following PAMC provisions are seen as relevant to this application. The DCED staff provides
comments under each provision to demonstrate the analysis conducted during the application
review process and the findings of fact pertinent to the plan.
Title 18 – Administration and Personnel
Per PAMC Section 18.02.050, the City Council has the authority to review and is authorized and
directed to hear and decide on Type V permit applications.
Staff Analysis: A Comprehensive Plan periodic update requires a public hearing before the Planning
Commission. The recommendation to the City Council is based on the draft plan, comprehensive
public comments, the Port Angeles Municipal Code, and information available during the public
engagement process. Such a decision may be appealed to the Superior Court, provided that the
appeal is filed within 21 days of the City Council's decision, as per Chapter 36.70C RCW. If an
appeal is not filed within the applicable period, the City Council's decision is the final decision of
the City. A timely appeal of any City Council decision will stay all further proceedings by the
Department of Community and Economic Development, specifically related to the periodic update
under appeal.
Environmental Review
The City of Port Angeles is currently undergoing a SEPA Draft Environmental Impact Statement
(DEIS) 30-day public comment period under WAC 197-11-455. The comment period is from
September 18 through October 18, 2025. The environmental impacts of the proposed non-project
action are being considered in the DEIS. A Final EIS (FEIS) will be issued within 60 days of the end of
the public comment period for the DEIS per the requirements of WAC 197-11-460. Any interested
parties may submit written comments during the 30-day public comment period, addressed to the
CPA 25 -0112 Housing Action Plan Exhibit 1 – Staff Report Page 5
Department of Community & Economic Development (DCED). The comment period closes on
October 18, 2025.
VI. CONCLUSIONS AND STAFF RECOMMENDATION
Recommended Conditions of Approval
After a thorough staff analysis of the Comprehensive Plan Amendment Application No. 25-0112, it
has been identified that all standards will be met in accordance with the Port Angeles Municipal
Code. Staff recommends that the Housing Action Plan be adopted. There are no recommended
conditions of approval.
Staff Recommendation
Staff recommends that the Planning Commission forward a recommendation of approval for the
2025 Housing Action Plan Update to the City Council, incorporating any requested changes by
motion.
VII. ADDITIONAL EXHIBITS
Exhibit 2: CPA 25-0112 Draft Housing Action Plan
Exhibit 3: Public Comment Memo
CPA 25 -0153 Exhibit 1 – Staff Report
Page 1
EXHIBIT 1
DATE: Wednesday, October 22, 2025
TO: Planning Commission
FROM: Planning Division
SUBJECT: Comprehensive Plan Periodic Update Citywide Rezone No. 25 -0153 Staff Report
I. SUMMARY
The City of Port Angeles' 2025 Comprehensive Plan Periodic update is led by the required
Washington State Growth Management Act, RCW 37.70.A, B, and C. The update is required once
every 10 years.
The Port Angeles Comprehensive Plan is a collection of broad community-driven statements about
our values and vision for Port Angeles’ future. This vision focuses on the orderly and coordinated
physical development of the City over the next 20 years. This state-mandated update is due by
December 31, 2025.
This periodic update of Comprehensive Plan and specific development regulations ensures that
they are consistent with:
• Recent changes to state law,
• Updates to countywide planning policies, and
• Population and demographic changes, infrastructure needs, and investments.
The update includes a review of the city’s zoning policies and urban growth area (UGA) to ensure
sufficient land is available to accommodate projected housing needs and employment growth over
the next 20 years.
To demonstrate the City's ability to accommodate a projected 3,150 new residents, 1,970 housing
units, and 967 new jobs, a citywide rezone is being proposed. This rezone will align the Future Land
Use Map amendments and enact direct, meaningful land use changes supported by the 2025
Comprehensive Plan Periodic Update.
II. REZONE PROPOSAL
Typology Use
Rezones are being considered throughout several neighborhoods in Port Angeles based upon the
updated Comprehensive Plan Future Land Use Map (See Figure 1). Figure 2 provides an overview of
the proposed blocks and properties to be rezoned to higher intensities. The rezones are an immediate
CPA 25 -0153 Exhibit 1 – Staff Report
Page 2
demonstration of the changes to land use, community and capital development, and better-targeted
multimodal transportation systems. The following adjustments in intensity have been considered in
thirteen different locations in the City:
R7, Residential Mixed Density (R7) to Residential Medium Density (RMD). The R7 and RMD zones are
distinct in one critical way: The R7 zone does not have a minimum density requirement. These two zones
overlap in their density allowances, with RMD requiring more intensity in residential development. R7
has a maximum unit allowance of one unit per 1,750 square feet. RMD requires a minimum density of 8
units per acre, or one unit every 5,445 square feet. The RMD zone does not have a maximum unit
allowance. Traditionally, the R7 zones allowed one unit per 7,000 square feet. The rezoning of any
property from R7 to RMD allows existing uses to remain in conformance, while any redevelopment
requires at least one unit per 5,445 square feet.
R7 to CO, Commercial Office (CO). The CO zone is the City’s lowest intensity commercial zone, allowing
for all types of housing and office-based commercial uses, while allowing many commercial uses as
conditional uses. The rezone from R7 to CO provides for greater flexibility in neighborhood design and
encourages more active, walkable streetscapes. Locations proposed for this increase in intensity are
adjacent arterial commercial corridors and surrounding more intense mixed-use development.
R7 and RMD to CN, Commercial Neighborhood (CN). These areas are proposed to transition from a
residentially focused zone to a mixed-use, commercially focused zone because they possess essential
qualities that could support a small neighborhood center or an extension of a commercial corridor. By
supporting higher intensity, multi-level development, the CN zone will provide the appropriate scale and
streetscape for the areas identified for this rezone.
CO to CN. These areas are proposed to transition from a lower intensity mixed-use focused zone to a
multistory mixed-use zone because they possess essential qualities that could support a small
neighborhood center or an extension of a commercial corridor. By supporting higher intensity, multi-
level development, the CN zone will provide the appropriate scale and streetscape for the areas
identified for this rezone.
Residential High Density (RHD) and CO to CA, Commercial Arterial (CA). This change remedies
monocultural zoning and allows high-intensity residentially focused property to become a mix of uses
supported by arterial corridors.
CPA 25 -0153 Exhibit 1 – Staff Report
Page 3
Figure 2: Alternative 2 Future Land Use Map
Figure 3: Locations of the proposed rezone
Figure 1: Alternative 2 proposed Future Land Use Map
Figure 2: Proposed citywide rezone locations
Figure 1: Alternative 2 Proposed Future Land Use Map
CPA 25 -0153 Exhibit 1 – Staff Report
Page 4
Rezone Location 1:
Location: 8th Street between “A” and “G”
Streets
Change: R7 to CN
Reason for Change: Increasing the capacity
for multifamily and mixed-use housing
development along the 8th Street corridor.
Rezone Location 2:
Location: Oak and Chase Streets between the
8th/9th alley and Lauridsen Boulevard
Change: R7 to RMD
Reason for Change: Increasing the capacity
for multifamily and housing development
along the Lincoln Street corridor.
Rezone Location 3:
Location: Front/1st Streets east of Lincoln
Change: RHD to CA
Reason for Change: Bring the location into
greater conformance with surrounding uses
and support mixed-use development.
Rezone Location 4:
Location: Area west of Olympic Medical
Center and north of Front Street
Change: R7 to CO
Reason for Change: Bring the location into
conformance with surrounding uses and
increased housing potential.
CPA 25 -0153 Exhibit 1 – Staff Report
Page 5
Rezone Location 5:
Location: Area east of Olympic Medical
Center and north of Front Street
Change: R7 to CO
Reason for Change: Bring the location into
conformance with surrounding uses and
increased housing potential.
Rezone Location 6:
Location: Area between Chambers and
Eunice Street, north of 2nd Street
Change: RHD and CO to CA
Reason for Change: Bring the location into
conformance with surrounding uses and
increased housing potential.
Rezone Location 7:
Location: Area east and west of Webster Park
on south 2nd Street
Change: R7 to CO
Reason for Change: Create opportunity for
high density mixed use development
adjancent to Port Angeles Highschool
Rezone Location 8:
Location: Area between Washington Street
and White Creek and 2nd/4th Streets.
Change: R7 to CO
Reason for Change: Provide more
opportunities for increased mixed density.
CPA 25 -0153 Exhibit 1 – Staff Report
Page 6
Rezone Location 9:
Location: Area surrounding Webster Park
between Francis Street and Peabody Creek.
Change: R7 to RMD
Reason for Change: Provide more
opportunities for increased residential density
surrounding Webster Park
Rezone Location 10:
Location: Area outside the blocks east and
west of Race Street between 4th Street and
Lauridsen.
Change: R7 to CO
Reason for Change: Provide more
opportunities for increased mixed density
surrounding the Race Street corridor.
Rezone Location 11:
Location: Area along Race Street between 4th
and 8th Streets.
Change: CO to CN
Reason for Change: Support Race Street as a
more intense mixed-use corridor.
Rezone Location 12:
Location: Area between Lincoln and Peabody
Streets along Park Avenue.
Change: R7 to CN
Reason for Change: Provide opportunity for a
mixed-use commercial center adjacent to the
Port Angeles High School.
CPA 25 -0153 Exhibit 1 – Staff Report
Page 7
Rezone Location 13:
Location: Area between Lauridsen Boulevard
and Park Avenue to the west of Peninsula
College.
Change: RMD to CN
Reason for Change: Provide an opportunity
for a mixed-use commercial center adjacent
to Peninsula College.
III. PROCEDURE
The Comprehensive Plan is a twenty-year plan first drafted in accordance with the Growth
Management Act in 1995. State law requires municipalities fully planning under the GMA to update
the Plan every ten years. Port Angeles is required to complete the periodic update by adopting the
Plan before December 31, 2025. Public Engagement for the update kicked off in June 2024. The
citywide rezone was brought to the community for feedback in the following manner:
• January 28 Stakeholder Advisory Committee Discussion of the Future Land Use Map
• Public Newsflashes on the City’s website.
• August 27 presentation and discussion with the Planning Commission on the citywide
rezone proposal.
• A work session on the second draft of the Plan with the City Council that included
discussion on the rezone proposal.
• Notice of the October 22, 2025, public hearing for REZ 25-0153 was published in the
Peninsula Daily News on September 24, 2025, at City Hall, on the City’s website, and sent to
local stakeholders to solicit public comments on the proposed changes. Public Hearing
information on the City Rezone was sent to community stakeholders and previously
engaged community members who opted into the engagement email. Noticing individual
property owners is not required because the citywide rezone action is tied to a periodic
update regulated by RCW 36.70.A.
On October 22, 2025, the Planning Commission will hold a public hearing on REZ 25-0153 and
make a recommendation to the City Council. City Council will consider adoption of the 2025
Comprehensive Plan–including the Citywide rezone–by December 31, 2025. An appeal must be
submitted to the City of Port Angeles within 21 days of the notice of final decision.
IV. COMMENTS
Public Comment
See Exhibit 2, Public Comment Memo
CPA 25 -0153 Exhibit 1 – Staff Report
Page 8
City of Port Angeles Departmental Comments
Comments received from the City of Port Angeles Departments have been incorporated into the
draft Comprehensive Plan.
V. FINDINGS OF FACT & STAFF ANALYSIS
The analysis and findings of fact from the Department of Community and Economic Development
(DCED) staff are based on the draft plan materials, the Port Angeles Municipal Code (PAMC),
relevant standards, plans, public comments, and other available materials during the review
period. The findings and analysis section within this report is a summary of the completed review by
DCED staff.
Port Angeles Municipal Code
The following PAMC provisions are seen as relevant to this application. The Planning Staff provides
comments under each provision to demonstrate the analysis conducted during the application
review process and the findings of fact pertinent to the application.
Title 18 – Administration and Personnel
Per PAMC Section 18.02.050, the City Council has the authority to review and is authorized and
directed to hear and decide on Type V permit applications.
Staff Analysis: A Comprehensive Plan periodic update requires a public hearing before the Planning
Commission. The recommendation to the City Council is based on the draft plan, comprehensive
public comments, the Port Angeles Municipal Code, and information available during the public
engagement process. Such a decision may be appealed to the Superior Court, provided that the
appeal is filed within 21 days of the City Council's decision, as per Chapter 36.70C RCW. If an
appeal is not filed within the applicable period, the City Council's decision is the final decision of
the City. A timely appeal of any City Council decision will stay all further proceedings by the
Department of Community and Economic Development, specifically related to the periodic update
under appeal.
Environmental Review
The City of Port Angeles is currently undergoing a SEPA Draft Environmental Impact Statement
(DEIS) 30-day public comment period under WAC 197-11-455. The comment period is from
September 18 through October 18, 2025. The environmental impacts of the proposed non-project
action are being considered in the DEIS. A Final EIS (FEIS) will be issued within 60 days of the end of
the public comment period for the DEIS per the requirements of WAC 197-11-460. Any interested
parties may submit written comments during the 14-day public comment period, addressed to the
Department of Community & Economic Development (DCED). The comment period closes on
October 18, 2025.
CPA 25 -0153 Exhibit 1 – Staff Report
Page 9
Consistency
In preparation and submission of the Comprehensive Plan Periodic Update, the applicant has
demonstrated that all standards can be met in accordance with the City’s Comprehensive Plan and
the Port Angeles Municipal Code. Conditions placed on the permit in Section VI of this report
ensure those standards will be demonstrated in the future.
VI. CONCLUSIONS AND STAFF RECOMMENDATION
Having reviewed and considered the staff report, application materials, public comments, and all
the information presented, the City Planning Division recommends approval of Comprehensive
Plan Amendment No. 25-0153 for a periodic update to the Comprehensive Plan, and makes the
following conclusions:
1. Analysis and findings of fact from Staff are based on the entirety of the periodic update
materials, municipal code, City standards, plans, public comment, and all other materials
available during the review period. Collectively, the information contained in the staff report
is the record of the review. The analysis and findings section of this report is a summary of
the complete City Staff review and the specific findings of fact.
2. Per Section 2.36.010 of the Port Angeles Municipal Code (PAMC), the Planning Commission
advises on all matters relating to land use planning and comprehensive planning. The
Commission may make recommendations on ways to enhance Community and Economic
Development Department's community relations; review and make recommendations
concerning Community and Economic Development Department policies, procedures,
programs, and standards; make recommendations on how to promote public awareness of
the Community and Economic Development Department services and programs; and
review and make recommendations regarding legislative changes affecting Community and
Economic Development Department services in Port Angeles.
3. The City Council has review authority and is authorized and directed to hear and decide on
Citywide Rezones. As to all the foregoing issues and matters, the decision of the City
Council shall be the final decision of the City. Such a decision may be appealed to the
Superior Court, provided that the appeal must be filed with the City within 21 days after the
Director issues the decision. An appeal application for any decision of the Director shall
stay all further proceedings by the Department of Community and Economic Development
specific to the property under appeal.
Staff Recommendation
Staff recommends that the Planning Commission forward a recommendation of approval of the
Citywide Rezone application REZ 25-0153, with the conclusions and conditions in Section VI of this
staff report, to the City Council with any requested changes provided by motion.
CPA 25 -0153 Exhibit 1 – Staff Report
Page 10
VII. ADDITIONAL EXHIBITS
Exhibit 2: Rezone maps and inventory of properties incorporated into the rezone proposal
Exhibit 3: Public Comment Memo
CED Affordable Housing Report - September 2025
Type JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2025 YTD 2024 YTD
SUT - HB 1406 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $40,000.00
SUT - HB 1590 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $50,000.00 $754,999.00
FWP $39,666.66 $0.00 $17,444.82 $0.00 $6,676.43 $24,153.35 $25,750.54 $1,426.50 $12,776.31 $0.00 $0.00 $0.00 $127,894.61 $325,030.94
NICE- Small Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5,810.39
NICE - Medium
Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
NICE - Large Scale $0.00 $0.00 $0.00 $0.00 $0.00 $46,750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $46,750.00 $0.00
TOTAL CITY
INVESTMENTS $39,666.66 $50,000.00 $17,444.82 $0.00 $6,676.43 $70,903.35 $25,750.54 $1,426.50 $12,776.31 $0.00 $0.00 $0.00 $224,644.61 $1,125,840.33
PRP 3 1 0 0 3 2 0 1 2 0 0 0 12*15
MFTE 0 0 0 0 0 4 0 0 0 0 0 0 4*14
Key
SUT- HB 1406
SUT- HB 1590
FWP
NICE - Small Scale
NICE - Medium Scal
NICE - Large Scale
PRP
MFTE
Multi Family Tax Exemption. Contracts are shown in the month they were executed between developer and City, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the
monthly Building Report.*
Please Note: City staff invest considerable time to proactively engage with prospective housing developers in order to amplify these critical City programs. This report only includes one stage of this important process.
Fee Waiver Program. The costs of 25 permit types are waived by the City for all infill and multifamily housing projects.
New Improvements for Community Enhancement of Neighborhoods Projects (≤ $14,999). Grants are shown in the month that the contract was fully executed between the developer and the City.
Sales and Use Tax - HB 1406. Grants are shown in the month that the contract was fully executed between the developer and the City.
Sales and Use Tax - HB 1590. Grants are shown in the month that the contract was fully executed between the developer and the City.
New Improvements for Community Enhancement of Neighborhoods Projects ($15,000-$24,999). Grants are shown in the month that the contract was fully executed between the developer and the City.
New Improvements for Community Enhancement of Neighborhoods Projects (≥ $25,000). Grants are shown in the month that the contract was fully executed between the developer and the City.
Permit Ready Plans. Plans are shown in the month they were shared with prospective developer, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the monthly
Building Report.*
CED Building Report - September 2025
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2024 YTD
0 0 1 0 2 0 1 0 0 0 0 0 4
$0.00 $0.00 $700,000.00 $0.00 $368,722.00 $0.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,392,500.00
4 5 3 9 8 9 8 5 9 0 0 0 78
$352,600.00 $100,636.00 $71,652.00 $193,541.00 $295,571.00 $566,877.00 $141,293.00 $275,952.00 $462,277.00 $0.00 $0.00 $0.00 $4,671,997.00
0 0 0 0 0 0 0 0 0 0 0 0 4
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $12,628,130.00
1 0 0 1 0 0 0 0 0 0 0 0 0
$2,632,599.00 $0.00 $0.00 $69,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
0 0 0 0 1 0 0 0 1 0 0 0 1
$0.00 $0.00 $0.00 $0.00 $56,000,000.00 $0.00 $0.00 $0.00 $120,000.00 $0.00 $0.00 $0.00 $65,000.00
0 0 0 2 2 0 0 0 0 0 0 0 4
$0.00 $0.00 $0.00 $295,000.00 $726,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $937,000.00
2 0 0 0 0 0 3 0 1 0 0 0 10
$800,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $484,827.00 $0.00 $100,000.00 $0.00 $0.00 $0.00 $2,110,524.00
1 0 1 1 2 0 1 0 0 0 0 0 5
$250,000.00 $0.00 $282,354.00 $240,000.00 $85,000.00 $0.00 $26,680.00 $0.00 $0.00 $0.00 $0.00 $0.00 $944,520.00
2 0 1 2 0 2 2 1 2 0 0 0 10
$718,694.00 $0.00 $120,000.00 $570,860.00 $0.00 $463,742.00 $625,525.00 $350,000.00 $850,000.00 $0.00 $0.00 $0.00 $3,210,178.00
0 0 3 0 1 1 2 0 1 0 0 0 19
$0.00 $0.00 $282,659.00 $0.00 $94,565.00 $60,000.00 $108,098.00 $0.00 $29,532.00 $0.00 $0.00 $0.00 $1,754,161.00
18 27 35 27 29 28 33 52 29 0 0 0 213
$332,185.00 $318,083.00 $742,902.00 $416,350.00 $265,008.00 $897,274.00 $386,169.00 $543,867.00 $646,063.00 $0.00 $0.00 $0.00 $3,711,937.00
Comm 2 0 0 1 0 3 0 0 0 0 0 0 12
Res $16,500.00 $0.00 $0.00 $15,000.00 $0.00 $54,380.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $239,205.00
30 32 44 43 45 43 50 58 43 0 0 0 360
$5,102,578.00 $418,719.00 $2,199,567.00 $1,800,251.00 $57,834,866.00 $2,042,273.00 $1,774,092.00 $1,169,819.00 $2,207,872.00 $0.00 $0.00 $0.00 $39,665,152.00
3 0 4 4 4 1 3 1 3 0 0 0 22
$67,450.71 $32,495.68 $59,192.12 $49,188.64 $512,626.80 $49,407.87 $40,688.54 $49,618.44 $65,719.76 $0.00 $0.00 $0.00 $703,174.94
000101100100045*10
4 0 0 0 0 0 6 0 2 0 0 0 12 2*18
2 0 1 2 0 2 2 1 2 0 0 0 12 5*10
1 0 1 1 2 0 1 0 0 0 0 0 6 2*5
0 0 0 0 0 0 0 0 0 0 0 0 0 0*4
7 0 3 3 3 3 9 1 5 0 0 0 34 14*47
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Permit Fees Paid
Comm
Ind
Public
Res
New Construction
Repair and Alteration
New Construction
New Single Family
New Accessory Structure
Repair and Alteration
Repair and Alteration
Total Permits Issued
Total Construction Valuation
2025 YTD
Dwelling Units - Duplex
New Construction
Repair and Alteration
New Multi Family
New Manufactured Home
Dwelling Units - ADU
Demolition and Moving
Certificate of Occupancy
4
$1,070,222.00
60
$2,460,399.00
*The pending units are in various stages of staff review. Additionally, not all applicants have submitted a complete application at this time. While we expect the majority to advance through the review process, it is possible that some may experience the need for additional
review.
Dwelling Units - Single Family
Dwelling Units-Manufactured Home
Dwelling Units - Multi Family (3+)
Total Dwelling Units
Transitional Housing Units
$56,120,000.00
4
$1,021,000.00
0
$0.00
2
$2,702,099.00
2
6
$1,384,827.00
6
$884,034.00
12
$3,698,821.00
8
$574,854.00
278
$4,547,901.00
$74,550,037.00
$926,388.56
6
$85,880.00
388
23
CPA 25-0004
2025 Comprehensive
Plan Periodic Update
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 1
Ben Braudrick, Planning Supervisor
Comprehensive Plan
Periodic Update Summary
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 2
Growth
Management
Act
New Plan
Vision
Element
Updates
Periodic Update Analysis Performed
•Full Plan Audit
•Land Capacity Analysis
•Future Land Use Map Analysis
•Housing Needs Assessment
•Racially Disparate Impacts Analysis
•Transportation Analysis
•Capital Facilities Assessment
•Neighborhoods Assessment
•SEPA EIS Analysis
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 3
Public Engagement
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 4
1.12 Planning Commission Meetings
2.Stakeholder Advisory Committee
3.Citywide Vision Survey
4.Targeted Interviews
5.Storefront Studio
6.Draft Plan Public Workshop
7.Draft Plan Citywide Public Survey
8.Community and Civic Group Outreach
9.SEPA EIS Open House
10.City Council Work Session
Major Amendments
1.Revised Vision Statement.
2.Future Land Use Map and
designations amendments.
3.Inclusion of updated UGA policy
guidance.
4.Growth Management Element
inclusion in Land Use.
5.Economic diversity and high
wage job focus.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 5
Major Amendments
6.Access to facilities to promote high quality of life.7.Inclusion of Clallam County Hazard Mitigation in Plan.8.Focus on resiliency, equity and sustainability.9.Enhancing transportation network connectivity. 10.Focus on community partnerships.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 6
The Housing Action Plan was publicly noticed on September 24,
2025, in the following places:
•In the Peninsula Daily News
•On the City website
•Posted on the City Hall notice board
•Sent to the Stakeholder Advisory Committee and Vision 2045 opt-in
listserv.
The draft SEPA EIS comment period was from September 18 to
October 18, 2025. A Final EIS will be issued within 60 days.
CPA 25-0004 Procedures
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 7
Staff Recommendation
Staff recommends that the Planning Commission forward a recommendation of approval of CPA 25-004 Vision 2045 Comprehensive Plan Periodic Update to the City Council with any amendments provided by motion.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 8
Questions?
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 9
2025 Housing
Action Plan
Periodic Update
CPA 25-0112
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 1
Jalyn Boado, Housing Administrator/Associate Planner
Housing Action Plan Summary
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 2
What is in the
Housing Action
Plan?
Why are we
updating the
Plan?
What has the
City done in the
last two years?
Housing Needs Assessment Proposal
•Community Profile •Workforce Profile•Land Capacity Analysis•Housing Supply •Point-In-Time Count•Gap Analysis
PA needs at least 1,970 housing units in the next 20 years. We have the land capacity for 4,841 housing units.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 3
Housing Action Plan Proposal
1.Blighted Property Reduction Strategy
2.Weatherization and Repair programs
3.Permit Ready Plans
4.Affordable Housing Grants
5.Fee Waiver Program
6.Multifamily Builders Training
7.City-wide Housing Instability Advocate
8.Housing Pipeline Project
9.Co-living and Home Sharing Update
10.Multifamily Property Tax Exemption
11.Community Land Trusts
*In priority order
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 4
Housing Action Plan Procedures
The Housing Action Plan was publicly noticed on September
24, 2025, in the following ways:
•In the Peninsula Daily News
•On the City website
•Posted on official City Hall notice board
•Sent to the local housing partners and stakeholders.
The draft SEPA EIS comment period was from September 18 to
October 18, 2025. A Final EIS will be issued within 60 days.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 5
Public Engagement
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 6
1.Planning Commission
2.Stakeholder Advisory Committee
3.City Council
4.One-on-one meetings with Housing
partners
5.Community Events
6.Housing Stories and Surveying
7.June 2025 Open House
8.Publicly noticed on the City’s website on
August 8, 2025.
Public Engagement Comments
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 7
Housing Action Plan and Housing Needs Assessment Public Comment Themes
1.Affordable Housing Needs and Rent Concerns
2.Housing Supply, Planning, and Strategy
3.Supportive Housing and Services for Unhoused Residents
4.Regulations, Incentives, and Funding Mechanisms
5.Blighted Properties, Renovations, and Repairs
6.Stakeholder and Partner Organization Input
7.General Recommendations and Systemic Issues
Staff Analysis
Goal LU-3: Residential Neighborhoods and Housing Stock.
Goal H-1: Housing Supply.
Goal H-2: Housing Affordability and Access.
Goal H-3: Housing Quality.
Goal H-4: Collaboration for Affordable Housing.
Title 18 – Administration and Personnel
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 8
Staff Recommendation
Staff recommends that the Planning Commission forward a recommendation of approval of CPA 25-0112 for the 2025 Housing Action Plan Periodic Update to the City Council.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 9
Questions?
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 10
25-0153
Citywide Rezone
Public Hearing
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 1
Angel Torres | Long Range & Special Projects Administrator;
Associate Planner
What Is a
Rezone?
•Updates zoning to match the
Future Land Use Map
•Makes growth intentional, not
reactive
•Keeps zoning aligned with
community goals
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 2
Why a
Citywide
Rezone?
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 3
Required by Growth
Management Act (RCW 36.70A)
Supports projected growth:
•• 3,150 residents
•• 1,970 homes
•• 967 jobs
Aligns zoning with the 2025
Comprehensive Plan
What’s
Changing
•13 targeted areas
•Focused on corridors
and neighborhood hubs
•Strategic, compact
growth
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 4
Lincoln
Corridor
Change: Residential Mixed Density to Residential Medium Density
Why: Increase residential density in a central corridor
Result:
•More opportunities for duplexes, townhomes, small apartments
•Increased supply of housing near transit and services and school
•Existing homes remain conforming
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 5
Race Street Corridor
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 6
Change:
•R7 to Commercial Office (surrounding blocks)
•Commercial Office to Commercial Neighborhood
(corridor)
Why: Strengthen Race Street as a mixed-use corridor
Result:
•Expanded housing opportunities
•Active ground floors, housing above
•Improved walkability and neighborhood hub
Other Key Rezone Locations
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 7
1.Webster Park Area:
Residential Mixed Density
→ Commercial Office
2.Peninsula College Area:
Residential Medium
Density → Commercial
Neighborhood
3.Front Street Corridor:
Residential High Density
→ Commercial Arterial
Citywide Rezone Plan Procedures
The Housing Action Plan was publicly noticed on September
24, 2025, in the following ways:
•In the Peninsula Daily News
•On the City website
•Posted on official City Hall notice board
•Sent to the local housing partners and stakeholders.
The draft SEPA EIS comment period was from September 18 to
October 18, 2025. A Final EIS will be issued within 60 days.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 8
Past Community Engagement
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 9
•Stakeholder Advisory Committee:
January 28th
•Planning Commission briefing:
August 27th
•City Council work session:
September 23rd
•Public Noticing:
September 24th – October 22nd
Public Engagement Comments
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 10
•Cherry Hill - Concerns regarding increased residential capacity and equity
impacts in the neighborhood.
•Lauridsen - Questions around traffic, pedestrian safety, and coordination with
schools.
•Race Street - Rezone additional properties adjacent to the Race Street
Corridor
•General - Interest in process transparency, shoreline balance, and ongoing
Tribal coordination.
Staff Response
PORT ANGELES PLANNING COMMISSION MEETING– OCTOBER 22, 2025 11
•Cherry Hill - Targeted upzones are tied to adopted housing goals and provide
a regulatory framework, not project approvals.
•Lauridsen - Strategic placement of density near Peninsula College aligns
growth with existing and planned infrastructure.
•Race Street - Zoning pattern balances neighborhood scale with corridor
vitality through stepped intensity.
•General - Use of CO and CA zones channels growth into corridors with
capacity, supporting business and housing objectives.
Staff Recommendation
Staff recommends that the Planning Commission
forward a recommendation of approval of the
Citywide Rezone application REZ 25-0153 to the City
Council with any recommended amendments by
motion.
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 12
Questions?
PORT ANGELES PLANNING COMMISSION MEETING – OCTOBER 22, 2025 13