Loading...
HomeMy WebLinkAbout10-25RESOLUTION NO. O - 2 A RESOLUTION of the City Council of the City of Port Angeles, Washington, amending in part the City of Port Angeles Master Fee Schedule for Annual Cost Adjustments and Other Updates; and Expanding the City's Over -the -Counter Permitting Program. WHEREAS, the City of Port Angeles charges various fees for services, permits, licenses, and other costs; and WHEREAS, the Port Angeles Municipal Code section 1.25.010 states that except when otherwise stated, any fee or charge due or referenced in the PAMC will be set forth in the City's Master Fee Schedule; and WHEREAS, it is in the best interest of the City government to periodically update and revise its fee structure to ensure the financial resources to support City services; and WHEREAS, the City supports the expansion of the Over -the -Counter Permitting program to the Fire Department and the Public Works and Utilities Department in early 2026; and WHEREAS, the amendments to the fee schedule are appropriate to sustain an efficient and effective City permitting and inspection system. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles that: Section 1. — Master Fee Schedule. The Master Fee Schedule of the City of Port Angeles is amended in part as set forth in Exhibit A. Section 2. — Over -The -Counter Permits. To further enhance customer service, the following departments will evaluate their permitting timelines for all Type I permits under their review or regulation within Table 18.02.050-2 (Permit Types — Decisions). The departments will determine 1 which Type I permits will be reclassified into the Type 0 "Over -The -Counter" permitting program. This reclassification review will include at a minimum, but not be limited to the following: A. Public Works and Utilities Department i. Demolition Permits ii. Certain Right -of -Way Use Permits iii. Side Sewer Repair Permits iv. Certain Minor Stormwater Discharge Permits B. Community and Economic Development Department 4. i. Mobile and Itinerant Vendor Permits C. Fire Department i. Welding and Cutting Inspections ii. Marine Fueling Operations Accordingly, the Departments will transmit an ordinance to the Planning Commission for recommendation to the City Council by April 1, 2026. Section 3. - Corrections. The City Clerk and the codifiers of this resolution are authorized to make necessary corrections to this resolution including, but not limited to, the correction of the scrivener's/clerical errors, references to other local, state, or federal laws, codes, rules or regulations, or numbering, section/subsection numbers and any references thereto. Section 4. - Effective Date. A summary of this resolution shall be published on or before December 24, 2025. This resolution shall take effect on January 1, 2026. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the day of 025. Kate Dexter, Mayor 2 ATTEST: - (_�4L �" IL �'_ Kari Martinez -Bailey, City Clerk APPRO ,/ED AS TO FORM: William E. Bloor, City Attorney Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. % CITY OF PORT ANGELES y MASTER FEE SCHEDULE Effective January 1, 2026 CebF gar., �n�� Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Table of Contents Contents Tableof Contents........................................................................................................................2 Animal Licenses, Permits, and Other Related Fees:.................................................................4 AnimalLicense Fees: .................................................................................................................... 4 Dangerous Dog Registration Fees: ................................................................................................ 4 Impoundfees and costs: ............................................................................................................... 4 New -Annual Business License Fees: ......................................................................................... 5 PBIA Special Assessment Fees: ................................................................................................ 5 OceanView Cemetery Fees.....................................................................................................5 5 Siteacquisition: ............................................................................................................................. Site Preparation — Opening and Closing: ....................................................... 5 ...........................................................................................................5 MeFnoF4a! Foundation-; .........................................................................................4..........................5 Memorials, Headstones, Markers: ................................................................................................ 6 LiReFBurial Vaults: ........................................................................................................................ 6 Cremation niches (if available): ..................................................................................................... 6 Columbarium niches (if available and sold as a package): ............................................................ 6 OtherFees: ................................................................................................................................... 6 Fee Waivers for Permitting of Certain Housing Projects: ......................................................... 7 Community and Economic Development Fees: ........................................................................ 9 Development Fees and Charges — Building: .................................................................................. 9 Building Review for Other Departments: ....................................................................................... 9 BuildingPermit Fees: .................................................................................................................... 9 Building Inspections, Building Plan Review, and Other Fees: ..................................................... 10 Certificate of Occupancy Fees: ................................................................................................... 11 Stand Alone - Plumbing and Mechanical Permits, Inspections, and other related fees: ............... 11 PlumbingUnit Fees: ................................................................................................................... 11 MechanicalUnit Fees: ................................................................................................................ 12 Development Fees and Charges - Land Use: ............................................................................. 14 Planning/Land Use Building Plan Review for Other Departments: .............................................. 14 MiscellaneousPermit Fees: ........................................................................................................ 14 Noticing, Pre -Applications, and Multi -family tax exemptions: .................................................... 14 HearingExaminer: ...................................................................................................................... 14 LandUse Permit Base Fees: ...................................................................................................... 15 SignPermits: .............................................................................................................................. 17 Short -Term Lodging Business License Fees: .............................................................................. 17 FireDepartment Fees: .............................................................................................................. 19 Penalty for Failure to Obtain Permit is 3x the permit fee.................................................................19 FireDevelopment Fees: .............................................................................................................. 19 FireOperational Permits: ............................................................................................................... 20 FireInspection Fees: ................................................................................................................... 20 Fire Department Other Fees: ....................................................................................................... 21 Ambulance Transportation and Mileage Fees: ............................................................................. 21 PoliceDepartment Fees: .......................................................................................................... 22 Public Works and Utilities Department Fees:..........................................................................22 Penalty for Failure to Obtain Permit is 3x the permit fee.................................................................22 Public Works Siting Building Plan Review 25% of the building permit fee..................................22 Public Works Review of Planning Permits 20% of the planning permit fee.................................22 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Electric Permits and Inspections: ................................................................................................ 22 Gradingand Filling: ..................................................................................................................... 23 Clearingand Drainage: ............................................................................................................... 23 Stormwater Public Works and Utilities Department Fees: ............................................................ 23 Sewer/Water Capacity Analysis: ................................................................................................. 23 Right -of -Way Fees: ..................................................................................................................... 24 Right -of -Way Use Permit Fees: ................................................................................................... 24 Utility Service and Connection Fees: ....................................................................................... 24 Finance Department Utility Charges: ........................................................................................... 24 Industrial Wastewater Pretreatment Fees: ................................................................................... 25 ElectricUtility Service: ................................................................................................................. 25 Water/Sewer/Storm Service Connection Fees: ............................................................................ 27 Upon Request, Underground Utility Work Performed by the Public Works Department ...............28 MiscellaneousUtility Charges: .................................................................................................... 28 Miscellaneous Public Works and Utilities Department Fees and Charges: .......................... 29 Recreation Facility Fees and Charges: .................................................................................... 29 Recre�ation Fees: ......................................................................................................................... 29 Adult CityFacilities Rental Fees...........................................................................................................30 Copying Costs and Other Miscellaneous Fees.......................................................................33 Feesfor Copying Records...........................................................................................................33 Miscellaneous Fees and Charges...............................................................................................34 3 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Animal Licenses, Permits, and Other Related Fees: Animal License Fees': Description: Fee: One-year License: • Neutered or spayed do $10.00 • Neutered or spayed cat $8.00 • Unaltered dog or cat $35.00 Lifetime License: • Neutered or spayed and microchi ed do $75.00 • Neutered or spayed and microchi ed cat $60.00 Certified assist dog for the disabled (if RCW 49.60.380 is applicabie Free Unlicensed dogs or cats that are impounded 2x the licensing fee Late Penalty all licenses $5.00 Additional fee for replacement to $5.00 Service fee(private licensing outlet $3.00 Deposit non -current rabies vaccinations $100.00 Dancierous Doa Reclistration Fees: Description: fee: Potentially dangerous dog - initial registration (licensing not included $100.00 Potentially dangerous do - annual renewal includes licensing)-$50.00 Dangerous do - initial registration does not include licensing) $150.00 Dangerous do - annual renewal includes licensing) $100.00 Late penalty $50.00 Additional fee for a replacement to $5.00 ImDound fees and costs: Description: Fee: Animal Impound Fees: • 1 st redemption within a 12-month period $25.00 • 2nd redemption within a 12-month period $50.00 • 3rd orsubsequent redemption within a 12-month period $75.00 • Potentially dangerous d $50.00 • Dangerous do $100.00 • Livestock per each animal $100.00 • Inherently dangerous animals $100.00 minimum Transportation costs: • Animals transported by a City Animal Control Officer, per mile $3.00 • Animals transported by others Reasonable costs Daily boarding costs: • Animals boarded at the animal shelter Up to $20.00 • Animals requiring specialized care Up to $40.00 • Animals boarded by others Reasonable costs Euthanasia costs: • Animals humanely euthanized at the animal shelter Up to $45.00 • Animals humanely euthanized by others Reasonable costs Rabies vaccination required for licensing. 4 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Disposal costs - animals disposed of at the shelter: • Up to 30 pounds $20.00 • 31 to 70 pounds $30.00 • 71 to 100 pounds $45.00 • 101 to 300 pounds $60.00 • Greater than 300 pounds, per pound $1.00 Disposal costs - animals disposed of by others Reasonable costs Veterinarian costs includes medications Reasonable costs Rabies vaccination Negotiated with local veterinarians New Annual Business License Fees2: Description: Annual Business License Fee as authorized by RCW 35A.82.0203: Annual Business Gross Revenue $0425,000 & Non -Profit $0 Organizations Annual Fee Annual Business Gross Revenue over $25,0001 Annual Fee $190.00 PBIA Special Assessment Fees: Description ee • New business assessment one-time initial fee $100.00 • Less than 1,000 square feet $160.00/year • 1,000 — 5,000 square feet $266.00/year • 5,000 or more square feet $400.00/year Ocean View Cemetery Fees4 Site acquisition: Description: Fee Adult-W Ground Burial Space — 4' x 8' - Interment $1,700.00 Ground Burial Space — 2' x 2'- Inurnment $600.00 Memorial Space 2' x 2' $500.00 Site Preparation — Opening and Closing: Descri tion: Fee Aduk-Let Ground Burial Interment - Adult $1,300.00 44antLGt Ground Burial Interment - Youth $600.00 Sremation Ground Burial Inurnment $600.00 Entombment $1,100.00 Description: Fee lndivideal $400.00 GempaniGR $600 50 2 Short -Term Lodging Business License Fees are exempt from these requirements. a 4 15% discount to all non -merchandise items fees for residents of the City of Port Angeles. 5 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Memorials, Headstones, Markers: Description: Fee Memorials Headstones Markers: Variable Pricing Memorials Headstones Markers Installation: Size De endent der Burial Vaults: Description: Fee Burial Vault — Oversized Special Order Burial Vault — 86" x 30" x 25" - Adult $400.W 622.00 Adult Liner RaGement Burial Vault — 46" x 22" x18" - Youth $4 0-.00 430.00 Burial Vault — 29.25" x 14.25" x 12"- Infant $400:00 350.00 Inf;+n# I ineF DlaGemeRt Burial Vault Installation $300.00 to $400.00 Cremation Burial Vault — 11" x 11" x 10" .00 Cremation Liner RaGemepA Cremation Burial Vault Installation $350.00 Cremation niches if available) - Description: Fee Individual $900.00 Individual & Companion $1,300.00 Eye Level and Below $1,500.00 Above Eye Level $1,300.00 Columbarium niches if available and sold as a package): Description: Fee Columbarium Niches $5,000.00 Other Fees: Description: Fee GFavesite of Chapel ServiGe Committal Service $400.00 Saturday SeFViGe $-4,600-00 Body Disinterment $3,500.00 Disinurnment $1,000.00 Merchandise pricing 2x Wholesale Cost by Paid b the Cit Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Fee Waivers for Permitting of Certain Housing Projects: 1. Fees will only be waived for developments within the City Limit of Port Angeles. 2. New Single -Family Residences or the Remodel, Addition, or Repair of an Existing Single - Family Residence may be eligible for a permit fee waiver if the following criteria are met: a. Applicant must own the property or the existing residence. b. Applicant must be experiencing Economic Hardship, defined under Port Angeles Municipal Code (PAMC) 17.08.030. c. Owner must submit to Community and Economic Development (CED) a complete Economic Hardship Fee Waiver Application on a form provided by CED. d. Applicant must be the owner of the property for two years following the issuance of the fee waiver. If the house sells prior to two years, the applicant shall reimburse the City. The applicant shall enter into a contract with the City. e. This program ends on December 31, 2029. 3. New Projects - Types of housing eligible for a fee waiver: a. Developed pursuant to Port Angeles Municipal Code (PAMC) Table 17.20.020: Dwelling Units and Supportive Housing in Commercial zones, 17.21 Residential Infill Design Standards,17.22 Commercial and Multifamily Design Standards (Multifamily residential allowed uses only), or 17.46 Property Tax Exemptions for Multi -family housing; AND b. Are one of the following: i. Projects utilizing the City Permit Ready Plans ii. Accessory Dwelling Unit iii. Duplex iv. Triplex V. Fourplex vi. Cottage Housing vii. Caretaker Unit viii. Apartment Complex ix. Townhomes X. Multifamily Housing xi. Group Home xii. Permanent Supportive Housing xiii. Transitional Housing xiv. Emergency Housing, xv. Adult Family Homes. xvi. Low -Income Homeownership Programs (LIHP), defined as single household dwellings constructed through a recognized nonprofit, local, state, or federal self- help or sweat equity program whereby labor participation is required, and whose income at eligibility is 80% or below of Area Median Income (AMI) for Clallam County as published by the program regulatory body. LIHP projects and affordable housinq projects, both rental and homeownership, constructed through a recognized nonprofit, local, state, or federal affordable housing provider shall be exempt from the contract and Notice -To -Title (NTT) provisions of Section 3c and 3d below. Nonprofit, local, State, or federal LIHP projects shall be exempt from paying the pre -application fee for fee waiver application. 4. To qualify for the new project— types of housing fee waiver, the Developer must: a. Submit to CED a complete Permit Fee Waiver Application on a form provided by CED. b. A fee waiver meeting will be required for all new developments with more than 6 housing units or otherwise determined based on project complexity. If a meeting is required, the applicant will pay the pre -application fee. If the applicant submits the proposal and the project is deemed applicable and approved for the fee waiver, the applicant will be reimbursed the pre -application fee at the time of building permit approval. c. Enter into a contract with the City of Port Angeles, agreeing that the unit(s) will not be used for any Short -Term Rental, Bed and Breakfast, Hotel, Motel, or any similar Lodging 7 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Type Use, and on such other terms and conditions as directed by CED. d. Execute a Notice -to -Title (NTT) to be filed with the Clallam County Auditor's Office at the expense of the owner/applicant. The NTT will be valid for 10 years. e. At a minimum, the contract provisions will include: i. A detailed project description for the eligible development which will be binding via the contract. Changes to the proposal may result in permit fees if the use is no longer eligible. If the use changes to a different eligible development a revised contract is required. ii. An exhibit to include the preliminary detailed site plan. The contract may be required to be amended if the site plan changes. If the proposed site plan changes to an ineligible development, the contract is void and the applicant must pay any waived permit fees. iii. In the event the owner/applicant requests the restriction to be removed, the applicant will pay 1.5x the permit fee and work with the City to remove the NTT at the owner/applicant's expense. iv. The restriction and NTT will only be removed if the proposed use is consistent with current permitted uses, development, and other applicable regulations. v. Re -inspection fees for failed/premature inspections may be assessed as additional inspection fees if continued cost by the City occurs for multiple failed inspections. vi. Failure to abide by the contract requirements will result in the owner paying 2x the waived permit fee and daily fines while in violation. For eligible new development within the Port Angeles City Limits listed above under 3a and 3b, the following fees are waived: a. Building Permit Fees b. Building Plan Review Fees, Fire Plan Review Fees, Planning Plan Review Fees, Public Works Siting Plan Review Fees c. Building and Fire permit renewal fees d. Additional hourly rate fees e. Fire Development Fees f. Hearing Examiner Fees for zoning reclassifications, eligible residential and duplex variances, binding site plan improvement plans, multifamily variances, preliminary subdivisions, overlay zones only as they relate to eligible development listed above, and any other hourly hearings as it relates to eligible development subject to Community and Economic Development Director Determination. g. Archeological review fees h. Boundary tine adjustment fees i. Conditional use permits fees j. SEPA Environmental Checklist Review k. NEPA 1. Adoption of previous NEPA/SEPA Documents m. Land Use Verification n. Locate Notice Review o. Lot Confirmation p. Overlay Zones q. Parking Variance r. Short Plats, Plats, Binding Site Plans s. Temporary Use Permit t. Zoning Lot Covenant u. Electric Utility Service Charges: Electrical residential work permits and fees, including inspections and applicable taxes. v. Residential new wate. r.,harges and system development charges* w. Sewer Connection Permits/charges for eligible development* x. Storm Sewer/Drain Connection Charges for eligible development* y. Sewer System Development Charges for eligible development* z. Electrical Permits for eligible development *Applicants will still be responsible for utility extensions where applicable H. Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Community and Economic Development Fees: Development Fees and Charges - Building: 1. The applicant must provide the building department with the actual value of construction for all new structures, additions, remodels, alterations, or repairs. (Valuation for construction by the owner must include fair market value for both materials and labor). 2. Building permit fees are based on the total project valuation of the work included in the permit. 3. The City of Port Angeles will not accept a valuation lower than the minimum valuation as determined by the current International Code Council (ICC) Building Valuation Data Table. 4. All applications for alterations, remodels, and repairs are required to provide an actual valuation and cannot use the ICC data table to calculate valuation. 5. The valuation of work is published by the ICC. The City of Port Angeles adopts the most current publication to determine building valuations. 6. All applications must include proposed occupancy and construction type. 7. If the value provided does not include both labor and material or is provided at a low estimate, the City may increase the valuation to the current market value for the purpose of calculating permit fees. 8. Actual Cost = Cost of consultant, 3ro party review, other outside review 9. All application base rates are based on minimum hours necessary for review, at the rate of $95 10 98.00 per hour. Any hours over the pre -determined base rate will be billed at an hourly rate of $95.10 98.00 per hour. 10. 31d incomplete permit or revision submittal results in 1.5 times the hourly review rate of $142.65 147.00 per hour. 11. Penalty for Failure to Obtain Permit is 3x the permit fees. Building Review for Other Departments: • Adm inistrative7 Permit Routing of Fire Permits .................. 25% of the fire permit fee • Building Review of Planning Permits.....................................20% of the building permit fee. • Building Review of Public Works Permits...............................20% of the building permit fee. Building Permit Fees: Total Valuation: Fee $ 1.00 to $ 500.00 $ 87.50 $ 501.00 to $ 2,000.00 $ 87.50 for the first $ 500.00 plus $ 5.34 for each additional $ 100.00 or fraction thereof $ 2,001.00 to $ 25,000.00 $ 167.60 for the first $ 2,000.00 plus $ 24.50 for each additional $ 1,000.00 or fraction thereof $ 25,001.00 to $ 50,000.00 $ 731.10 for the first $ 25,000.00 plus $ 17.68 for each additional $ 1,000.00 or fraction thereof $ 50,000.01 to $ 100,000.00 $1,173.10 for the first $ 50,000.00 plus $ 9.80 for each additional $ 1,000.00 or fraction thereof $ 100,001.00 to $ $ 1,663.10 for the first $ 100,000.00 plus $ 9.20 80 for each additional 500,000.00 $ 1,000.00 or fraction thereof $ 500,001.00 to $ $ 5,583.10 for the first $ 500,000.00 plus $ 8.31 for each additional 1,000,000.00 $1,000.00 or fraction thereof $ 1,000,001.00 to $ $9,738.10 for the first $ 1,000,000.00 plus $ 6.38 for each additional 5,000,000.00 $1,000.00 or fraction thereof $5,000,001.00 and up $ 35,258.10 for the first $ 4 5,000,000.00 plus $ 4.70 for each additional $ 1,000.00 or fraction thereof 17 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Buildina Ins ections, Building Plan Review, and Other Fees5: Description: Fee Residential (in-house) 65% of the building permit fee Commercial/Industrial (in-house) 65% of the building permit fee Commercial/Industrial and 3rd Party Plan Review 65% of building permit fee + ACTUAL COSTS Building Permit Renewal - 1st $295.30 294.00 Building Permit Renewal - 2"d 50% of the original permit fee BuildiRg Review of P!aRn'Rg Permit 20 of the' - - ncrmi+ fc� Inspections outside of normal business hours (minimum $295-.30 294.00 + ($442.65 147.00/hour charge - two hours @ 1.5x hourly rate) after 2 hours) 1st Reinspection fee (minimum charge - one hour) $ 95.10 98.00/hour 2nd+ reinspection fee (minimum charge - one hour) $ 442.65 147.00/hour each Inspections for which no fee is specifically indicated (minimum $95.10 98.00/hour charge - one hour). Additional plan review for reviews exceeding the allotted hourly fee provided for general plan check review or required by $95.10 98.00/hour changes, additions, or revisions to approved plans (minimum charge - one hour) For the use of outside consultants for plan review, inspections, or both ($9&10 98.00/hour staff time, min. 2 $490 20 196.00 Staff Time + Actual hours) Costs $ 6.50 for each residential building State surcharges per RCW 19.27.085 permit, plus $ 2.00 for each additional residential unit $25.00 for each commercial building ermit Manufactured Home Permit - see all reviewfees listed here: no $475.50 490.00 Building Review and additional percent review fees will be charged. Does not include Inspections $98.00 Fire Review cost of fire sprinkler/alarm permits if required. inGl des perm -it- $98.00 Public Works Review $98.00 Planning Review Any failed inspections may result in reinspection fees. Total Cost: $784.00 Building Permit Appeal $760.80 980.00 plus hearing examiner fees Demolition Permit $380.40 392.00 Residential Re -Roof Permit $380 48 392.00 Residential Solar Panel Permit $2Z5-.30 294.00 5 Hourly costs are as listed or the total hourly cost to the City, whichever is the greater. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. Actual costs include administrative and overhead costs. 10 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Certificate of Occupancy Fees: Certificate of Occupancy - Residential $4-9� 196.00 Reissuance of Existinq Certificate of Occupancy 98.00 Certificate of Occupancy - Commercial/Industrial $475-.50 490.00 Reissuance of Existing Certificate of Occupancy - Commercial/Industrial $245.00 Change of Ownership Commercial/Industrial - Certificate of $245.00 Occu anc Temporary Certificate of Occupancy 30 days) - Residential $954-0 98.00 Extension of Certificate of Occupancy (add. 30 days) 1S': $ 95.10 98.00 2'": $ 95.10 98.00 3'"+: $490:20 196.00 each Temporary Certificate of Occupancy (30 days) - Commercial/Industrial $855.90 882.00 Extension of Certificate of Occupancy (add. 30 days) 1st: $490 20 196.00 2nd: $390.49 392.00 3rd+: $47-5-.50 490.00 each Stand Alone - Plumbing and Mechanical Permits, Inspections, and other related fees: 'For all new residential construction, Plumbinq and Mechanical fees are included in the Buildina Permit Fee. Description: Fee Residential Mechanical or Plumbing Permit Issuances $285.30 294.00 Commercial/Industrial Mechanical or Plumbing Permit Based on the valuation of the project. Issuance'. Calculated from the building permit fee table. Each supplemental permit for which the original permit has not expired, been canceled, or finaled. $190.20 196.00 Inspections outside of normal business hours (minimum charge - two hours @ 1.5 hourly rate) $285.30 294.00 + ($442.65 147.00/hour after 2 hours) 1 s' Reinspection fees (minimum charge - one hour) 32nd+ reinspection fees (minimum charge - one hour) $95.10 98.00/hour $442.65 147.00/hour Additional/other Plan Review Fee (if required) $ 95 -0 98.00/hour Inspections for which no fee is specifically indicated (minimum charge - one hour $95.10 98.00/hour Additional plan review required by changes, additions, or revisions to approved plans (minimum charge - one hour) $95.10 98.00/hour Plumbing Unit Fees: Description. Fee Plumbing Trap $44.9016.00 Water Heater $44.W 16.00 Water Line $44-00 16.00 Sewer Line $30.00 32.00 Private Sewage Disposal System $80.00 82.00 Cesspool where permitted $50�0 52.00 6 Fee listed is base fee. Unit prices are appliable to all residential mechanical and Plumbing permits. Fee listed is base fee. Unit prices are applicable to all commercial/industrial mechanical and Plumbing permits. 11 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Industrial Waste Pretreatment Interceptor $44.00 16.00 Gray Water System $80:00 82.00 Reclaimed Water System $61.00 62.00 Annual Cross -Connection Testing of a Reclaimed Water System $14.0016.00 Rainwater Systems - per Drain Inside Building) $44.0016.00 Vent Piping $44.0016.00 Fuel Gas Piping 1-5 outlets $21.30 24.00 Fuel Gas Piping, each five additional outlets $10.00 12.00 Medical Gas Piping, 1-5 outlets $400.00105.00 Medical Gas Piping, each five additional outlets $480012.00 Lawn Sprinkler System Backflow Protection Device $4440 16.00 Atmospheric -type Vacuum Breakers, 1 to 5 $40.W 12.00 Atmospheric -type vacuum breakers, each five additional vacuum breakers $2:00 5.00 Backflow Protection Device:5 2-inch $44 0A 16.00 Backflow protection device > 2-inch $30.00 32.00 Plumbing Plan Check Fee $9&.40 98.00/hour Mechanical Unit Fees: Description: Fee Furnace or heat pumor forced air unit:5 5-ton $30-.00 32.00 Furnace or heat pump or forced air unit > 5-ton $40.00 42.00 Heater (suspended, recessed wall, floor -mounted) $30.00 32.00 Boiler, compressor, absorption system • <_ 3 hp, 100,000 Btu/h $30:00 32.00 • > 3-15 hp, > 100,000-500,000 Btu/h $56-00 58.00 0 > 15-30 hp, > 500,000-1,000,000 Btu/h $76700 78.00 • > 30-50 hp, > 1,000,000-1,750,000 Btu/h $440-00 115.00 • > 50 hp, 1,750,000 $48&.00196.00 Air handler <-10,000 cfm $2-?00 24.00 Air handler > 10,000 cfm $29-.00 32.00 Evaporative cooler attached, notportable) $22:09 24.00 Heating or cooling appliance repair or alteration $2-8-.00 32.00 Ventilation fan connected to a single duct $445-.-00 18.00 Ventilation system (not part of a heating or air conditioning system) $22.00 24.00 Appliance vent $45-A0 18.00 Hood and ducts served by mechanical exhaust $22-40 24.00 Fuel gas piping, 1 to 5 outlets $10 00 12.00 Fuel gas piping, each additional five outlets $40-.W12.00 Hazardous/non-hazardous process piping system, 1 to 4 outlets $22.00 24.00 Hazardous/non-hazardous process piping system, each 4 additional outlets $30.00 32.00 Pellet stove, wood -burning stove, and other misc. appliance vent ore ui ment8a $22.00 24.00 Gas/Propane fireplace, heating stove, cooking stove, and other misc. gas/propane appliances or equipment (not otherwise listed $22.00 24.00 Gas appliance inspection 98.00 12 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Gas line 24.00 Mechanical Plan Check Fee $9&.40 98.00/hour 13 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Development Fees and Charges - Land Use: 1. All base fees are based on the minimum hours, at $95.10 98.00/hour, necessary to review permit application. Any hours spent on permit review beyond the base hours included will be charged directly to the applicant prior to permit approval at the rate of $95.10 98.00 per hour. To calculate the number of hours included, take the base fee and divide it by $95.10 98.00. 2. Base application fees do not include consultant costs, revision costs, noticing costs, or public hearing costs. If required for permit review, these will be charged in addition to the base permit fee. 3. Actual Cost = Cost of consultant, 3rd party review, other outside review 4. All application base rates are based on the minimum hours necessary for review, at the rate of $95.10 98.00 per hour. Any hours over the pre -determined base rate will be billed at an hourly rate Of $95.10 98.00 per hour. 5. 3rd incomplete permit or revision submittal results in 1.5 times the hourly review rate at $142.65 147.00 per hour. 6. Penalty for Failure to Obtain Permit is 3x the permit fees. 7. Land use permits requiring a public notice include additional notice fees. 8. Land use permits requiring a public hearing include additional hearing notice fees and hearing examiner fees as determined by this master fee schedule. 9. Land use base fees are subject to the applicable fees outlined in this master fee schedule, charged for review of all permits by the Department of Public Works, the Fire Department, and the Building Department when review by the applicable department is required. Planning/Land Use Building Plan Review for Other Departments: • Planning/Land Use Building Plan Review .......................`......... 20% of the building permit fee. • Planning Review of Public Works Permits...............................20% of the building permit fee. Miscellaneous Permit Fees: Nnticino Pre-Annlications. and Multi-familv tax exemptions: Description: Fee Notice of Application $45845 160.00 Notice of Hearin $458-.25 160.00 Multi -family roe tax exemption $0.00 Multi -family rope tax exemption extension $0.00 Pre -Application Meeting $960.09 980.00 Hearing Examiner: 1. Fees charged at cost per the hearing examiner (HE) fee rates + staff time. 2. The Hearing Examiner's Hourly Fee is $225.00. 3. The Staff Hourly Fee is $95.10 98.00. This will apply to all hearings and be calculated and paid prior to the permitting decision. 4. Any additional time spent on prorated hearings and billed by the Hearing Examiner will be billed directly to the applicant and must be paid prior to the permitting decision. Description: Fee Single-family residential and Duplex Variances $ 1,750.00 Zoning Reclassifications $ 1,750.00 Multifamily Variances and Conditional Use Permits Zoning Reclassifications $ 3,000.00 Annexation Uncontested $ 3,000.00 Binding Site Improvement Plans Zoning Reclassifications $ 3,000.00 Non -Residential Variances and Conditional Use Permits Zoning Reclassifications $ 3,000.00 Preliminary Subdivisions $ 3,000.00 14 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Shoreline Substantial Development Permits $ 3,000.00 Street Vacations $ 3,000.00 Unclassified Use Permits $ 3,000.00 Consolidated Hearings on Permit Applications, not including any appeals $ 3,850.00 Overlay Zones $ 3,850.00 Shoreline Variances and Conditional Uses Zoning Reclassifications $ 3,850.00 Annexations Contested $ 3,850.00 Appeals of Administrative Decisions $ 225.00/Hour (HE) + $95.10 98.00/Hour(staff) Code Enforcement Hearings $ 225.00/Hour (HE) + $ 95.10 98.00/Hour sta All other permit applications and hearings $ 225.00/Hour (HE) + $ 95.10 98.00/Hour sta Land Use Permit Base Fees: Description: Fee Annexation under ten acres $24,87-.30 2,254.00 Annexation over ten acres $9 3,724.00 • Annexation per acre additional fee after 10 acres $9540 98.00 Archaeological review $285.30 294.00 Archaeological survey/special studies $954-0 98.00/hour Boundary line adjustments • Preliminary Boundary Line Adjustment $4-426-50 1,470.00 • Final Boundary line adjustment $475:50 490.00 • Amendment to Boundary Lin Adjustment $44�5.50 490.00 Comprehensive Plan or map amendment $5,049.30 5 194.00 Conditional Use Permits • Conditional Use Administrative $4;-80�901,862.00 • Conditional Use Permit $4,279.50 4,410.00 • Conditional Use Extension $76O-.80 784.00 • Discretionary Conditional Use Permit Without Hearing $', 902-00 1,960.00 • Discretionary Conditional Use Permit With Hearin $",'T 79 50 4.410.00 • Unclassified Conditional Use $4,279-.50 4,410.00 Cottage industn. Deffmit $954-.W Home Occupation Permits • Type I Minor Home Occupation Permit (No Public Notice Required. $295 30 294.00 • Type II Maior Home Occupation Permit (Requires $980.00 Public Notice Development Agreement $800 8,820.00 Directors' Determination — Request $760:30 784.00 LUPA Appeals $95�00-980.00 Minor Deviation • Minor Deviation up to 20% $',^�0-50 1,470.00 • Minor Deviation 21-30% $4,279.504410.00 Mobile and Itinerant Vendors & Hosting • Minor Regulatory Mobile and Itinerant Vendor Permit $0 • Major Regulatory Mobile and Itinerant Vendor Permit $95:-1-0 98.00 • Minor Mobile and Itinerant Vendor Hosting Site Plan Review $190.20 196.00 • Major Mobile and Itinerant Vendor Hosting Site Plan Review $285.30 294.00 15 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Environmental Permits • Adoption of Previous NEPA/SEPA Document $285:80 294.00 • NEPA $4;426-50 1,470.00 • SEPA Environmental Checklist Review $895.10 980.00 • SEPA Environmental Impact Statement (EIS) Review $895.10 980.00 + Actual Cost • Conditional Use Administrative- Environmentally Sensitive Area $1,806.901,862.00 • Conditional Use - Environmentally Sensitive Area $4,'�50 4,410.00 • Environmentally Sensitive or Critical Area Permit $44464-91,078.00 • Exemption - Environmentally Sensitive or Critical Area %A7 .W 588.00 • Extension - Environmentally Sensitive or Critical Area Permit $880:40 392.00 • Geologically Hazardous Area Permit $4-_4 1,078.00 • Flood Development Permit $4446481,078.00 • Reasonable Use - Environmentally Sensitive Area $1,902.001,960.00 • Variance -Environmentally Sensitive Area $4,'�50 4,410.00 • Wetland Permit $4— -9:50 4.410.00 • Wetland Permit Extension $4;-902:001,960.00 • Wetland Temporary Emergency Permit $4-279-50 4,410.00 Land Use Verification %A7 .60 588.00 Locate Notice Review $95.10 98.00/hour Lot Confirmation $475:50 490.00 Open Space Exemption $89540 980.00 Overlay Zones (PRID, PID, MCO, PLID, IOZ • Preliminary $00 2,940.00 • Final $4-_426-50 1,470.00 • Minor Amendments to Overlay Zones $4-0464-0 1,078.00 • Major Amendments to Overlay Zones $0 2,646.00 Parking Variance $4-;426 50 1 470.00 Short Plats: • Preliminary Short Plats 1-9 lots $2;487-30 2.254.00 • Final Short Plats $4-_0 1,960.00 • Amendment to Short Plat $50 1,470.00 Plats: • Preliminary Subdivision Plats 10+ Lots $5 706:00 5,880.00 • Final Subdivision Plat $ 40 3,332.00 • Minor Amendments to Subdivision Plats $2-_14� 2,254.00 • Major Amendment to Subdivision Plats $2;853 00 2,940.00 • Plat Vacation $24-56 0 2,940.00 Binding Site Plans: • Preliminary Binding Site Plan $5-706:-09 5,880.00 • Final Binding Site Plan $80 3,724.00 • Minor Amendment to Binding Site Plan $','�-re?:30 2,254.00 • Major Amendment to Binding Site Plan $24_5. 9 2,940.00 Reasonable Use Exception $44a2-00 1 960.00 Site Specific Rezones $4,�9W 4 410.00 Area Wide Rezones $8--5 : 8,820.00 Amendments to Development Regulations Request $4'T 79 50 4,410.00 Amendments to the Port Angeles Municipal Code Request $4,274-50 4 410.00 Comprehensive Plan Amendment Request $4,275-50 4410.00 16 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Shoreline Permits: • Shoreline Conditional Use $',1�30 2.254.00 • Shoreline Exemption $740:-80 784.00 • Shoreline Substantial Development Permit $3,613-80 3,724.00 • Shoreline Permit Revision $4A2 -50 1,470.00 • Shoreline Variance $3- 80 3,724.00 Street Vacation $7450-.30 784.00 Temporary Use Permit • More than One Year, up to Five Years $4-;426-50 1,470.00 • One Year or Less $7450-.80 784.00 • Extension of Amendment of Temporary Use $740-.90 784.00 Unit Lot Subdivision • Preliminary Unit Lot Subdivision $24_Z7-30 2,254.00 • Final Unit Lot Subdivision $4,902-.801,960.00 • Amendment to Unit Lot Subdivision $4;42 1,470.00 Transportation Demand Review - Parkin $0 2,744.00 Variances • Minor Variance $4-_80 1.862.00 • Major Variance $4-78-W 4,410.00 Wireless Telecommunications Towers/Facilities • New/Remodel, Replacement, Relocation $445480 4.802.00 • Co -locating on Existing Tower $2,377:59 2.450.00 Zoning Lot Covenant $57G.60 588.00 Zoning Confirmation $579-60 588.00 Sian Permits: Description: Fee Building Permit Base Fee: • All Signs Less Than or Equal to 25 SQFT $237-.75 245.00 • Wall Signs & Marquees Over 25 SQFT $2 &-30 294.00 • Freestanding Signs Over 25 SQFT $380:40 392.00 • Projecting Signs Over 25 SQFT $380-:40 392.00 Plan Check Review - All Signs. minimum charge - one hour $95.10 98.00/hour Zoning Review - All Signs minimum change - one hour $954-0 98.00/hour Public Works Review -All Signs minimum charge -one hour 98.00/hour Penalty for Failure to Obtain Permit 3x Permit Fee Short -Term Lodging Business License Fees: Rari anri RrPakfasts- -Descri- tion: Fee 1 Year BuGiness nence- Berl and Breakfast1 i $492-.29 R- d- and- R, ak q+'7 V &-miness I se $394.40 Bed and Breakfast 3-Year Business License $57 .-W 588.00 Chnrt_Torm Rantalc vDescription: v Fee Short -Term Rentals - Type I #i - 1 YeaF R_ac_'n__c_ LiGeR6e anal Inc-rnonnn - $ � • 7 V R1o' ecc 'ence and Incnon+inn $ � • 3-Year Business License and Inspection $955-.90 882.00 Short -Term Rentals - Type 11 17 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. • 1 Year BUSiRes I ico $j475.50 • 2 Year -Ru illy&0 L- Ge .C7. a $954- I • 3-Year Business License and Inspection $501.470.00 Platforms: Description Fee Bed and Breakfast Platform Annual Business License $475:-50 490.00 Short -Term Rental Platform Annual Business License $95 -.09 980.00 Additional Review Time by the City $9540 98.00/hour Appeals of Port Angeles Municipal Code (PAMC) 17.23 and 17.24: Description: Fee Appeal of decision from PAMC 17.23 $0 784.00 Appeal of decision from PAMC 17.24 $76A:-80 784.00 Hearing Examiner Fees includes both staff and hearing examiner fees • Hearing Examiner Fee $225.00/Hour • Staff Time for Hearing Examiner M.40 98.00/hour 18 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Fire Department Fees: Penalty for Failure to Obtain Permit is 3x the permit fee. Fire Development Fees: Description: Fee Fire Permit Renewal —1st $95-4-0 98.00 Fire Permit Renewal — 2nd 50% of the original permit fee Fire Department Building Plan Review 25% of the Building Permit Fee Fire Department Review of Planning Permits 25% of the Planning Permit Fee Additional Planning or Building Permit Review: 98.00/L�h(-o�u{{-r 0 SER Boundary Line „vim^• l ,rSubd*ViSiO rviVre}ine, Inspections outside of normal business hours (minimum charge $294.00 + ($147.00/hour after 2 hours) - two hours a 1.5x hour) rate 1 st Reinspection fee (minimum charge - one hour) 2"d+ reins ection fee minimum char e - one hour $98.00/hour 147.00/hour each Inspections for which no fee is specifically indicated (minimum $98.00/hour charge - one our . Additional plan review for reviews exceeding the allotted hourly $98.00/hour fee provided for general plan check review or required by changes, additions, or revisions to approved plans (minimum charge - one our Underground Fire Mains Commercial and Residential r WAC 51-54A-0105.6.25 • Plan review and inspection fee 490.00 • Inspections per additional building (two inspections: $392.00 cover and hydrostatic) Fire Alarm plan review, inspection, and testing: • Residential $95 40 98.00 • Multi -Family $4-00 196.00 • Plus, per device rate over five devices $5.00 per device • Commercial $475-.50 490.00 • Plus, per device rate over five devices $5.00 per device Automatic Fire S rinkler/Su ppressigL System Plan Review, Inspection, and Testin :s • Residential $95 40 98.00 • Multi -Family $490.20196.00 • Plus, per sprinkler head over 10 $1.00 per sprinkler head • Commercial $47-5-.9 490.00 • Plus, per sprinkler head over 10 $1.00 per sprinkler head • Commercial with Fire Pump $474.0 882.00 • Plus, per sprinkler head over 10 $1.00 per sprinkler head • Spray Booth Fire Protection System 490.00 • Plus, per sprinkler head over 10 $1.00 per sprinkler head For the use of outside consultants for plan review, inspections, or both ($95.10 98.00/hour staff time, min. 2 hours $190.20196.00 Staff Time + Actual Costs Hood/Duct System Plan Review and Inspection $442-.�147.00 Underground storage tank removal and installation inspection: .nnnrszrnna 19 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. • Commercial $4-98:-28196.00 • Residential $95:4-0 98.00 Fire/Development Permit Appeals $476.59 980.00 Fire Operational Permits10: Description: I Fee Welding and Cutting Inspections for Activities of the following duration JU91worksl • Up to 5 Days $400-.20 196.00 • 6 to 30 Days $285:30 294.00 • 31 to 90 Days $380A.0 392.00 • 91 to 180 Days $47&.50 490.00 0 181 to 365 Days $665.70 686.00 Marine fueling operations • Individual Permit $954-0 98.00 • Reins ection's $95 9 98.00 • Annual Permit $570:-60 588.00 Indoor -place of Assembly Opprational Permit • 50-250 People $95 0 98.00 0 251-500 People $490:20 196.00 • 501 + People $080 .0 392.00 Outdoor Assembly Operational Permit • 1,000 + People 1196.00 Tent/Membrane Structures *includes fire plan review and inspection; ** Add applicable assembly fee based on occupant load see assembly permit fees): • Commercial $38049 392.00 • Residential $95:40 98.00 Fireworks Display Permit $500.00 588.00 NFPA 33 Spraying & Dipping Operational Permit • Initial 980.00 • Renewal 1196.00 Spraying & Dipping O erational Permit • Initial 784.00 • Renewal JL96.00 All other Operational Permits required per IFC 105.5. 196.00 Fire Inspection Fees: Fire Inspection of Existing Structures: Description: Fee • B- Business $954-0 98.00 • Mercantile $9&. -0 98.00 • Storage $954-0 98.00 • Utility $9540 98.00 • R- Residential $442-.66 147.00 • Assembly $490.20196.00 • Educational $440 20 196.00 • Facto $2-1q-.-75 245.00 • Institutional $38048 392.00 • High Hazard $475�0 490.00 10 Subject to periodic spot inspections. 20 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Life Safety fire protection system fee - Charged at time of fire inspection. • Carbon Dioxide $4755 49.00 • Kitchen Hood and Duct $47-.&5 49.00 • Computer room/ clean agent $4755 49.00 • Fire Pump $47755 49.00 • Knox Box $0.00 • Fire Alarm $47.55 49.00 • 13 - Commercial Fire Sprinkler $47755 49.00 • 13D - Residential Fire Sprinkler $0.00 • 13R - Multi -Family Fire Sprinkler $47.55 49.00 • Spray Booth/ Room $47 55 49.00 Reins ection compliance fees: • Reins ection -1 st reins ection Included in the base fee • Reins ection - 2nd reins ection $442,65 147.00 • Reins ection - 3rd reins ection $390:40 392.00 • Reins ection - 4+ reins ection $475.50 490.00 Fire Department Other Fees: Description: Fee Fire Engine Standby WA Assoc. of Fire Chiefs Rate ALS Ambulance Standby WA Assoc. of Fire Chiefs Rate BLS Ambulance Standby WA Assoc. of Fire Chiefs Rate Fire Personnel Standby Actual Cost Response to False Alarms • 15t Response $100.00 • 2"d Response within 180 days of 1 st response $200.00 • 3+ Responses within 180 days of each other $300.00/occurrence False Fire Alarm Due to Failure to Notify the Fire Department Prior to System Service $100.00/occurrence Tampering or disabling Fire Protection Systems or Devices $1,000.00/occurrence Intentional false reporting $1,000.00/occurrence Misuse of the 911 system, 911 hang-up call, Emergency request for non -emergent assistance $250.00/occurrence Ambulance Transportation and Mileage Fees: "Medic I transports that involve advanced life support (ALS) services requiring either administration of at least three different medications or the provision of at least one ALS procedure as identified as ALS-2 in MPriirarP's current ambulance fee schedule: Description: Fee Medic I Transports that Involve Advanced Life Support ALS — 2 • Base Charge $4—_� 1.450.00 • Mileage, per mile $44,50 23.50 Medic I Transports that Involve Advanced Life Support ALS Services • Base Charge 1.400.00 • Mileage, per mile $44.50 23.50 Medic I Transports that Involve Only Basic Life Support Services: • Base Charge $800-.00 1.100.00 • Mileage, per mile $49,50 23.50 21 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Police Department Fees": Description Fee Application for Transfer of Firearm No Chare Bicycle License No Charge Concealed weapon permit12 • Original Permit $36.00 • Plus, FBI Charge $16.50 • Renewal $32.00 • Late Renewal $42.00 • Replacement Fee $10.00 Fingerprints $25.00 Lamination $2.00 Police Services - Regular $80.00/hour Police Reserve Details $40.00/hour Record Check13 No Charge Body Worn Camera Redaction Non -Involved Parties $0.70/minute Public Works and Utilities Department Fees: Penalty for Failure to Obtain Permit is 3x the permit fee. Public Works Siting Building Plan Review ................................. Public Works Review of Planning Permits ................................ Electric Permits and Inspections: .. 25% of the building permit fee .20% of the planning permit fee Description Fee Special block permit, see PAMC 14.05 $35.00 Electrical permit application plan review14 (Actual labor/materials costs) +15% for admin. expenses Transformer charge for a previously unserved residential lot with underground electrical service, including all applicable taxes $2,490.4315 Transformer charge for previously unserved residential lot with overhead electric service, including applicable taxes $ 1,370.8816 Charge for all other locations that require new distribution facilities See PAMC 13.12.010 Installation and Removal of a Temporary Service $220.03 Service Calls on Customer's Equipment $220.03 Service Calls on Customer's Equipment after regular working hours $396.05 Labor Billing Rate for Line Crew Personnel $75.00/hour17 Overtime $112.00/hour18 Contract and Administration Charge: 11 Fees are waived if total charge would be less than $5.00. 12 State allows no grace period for concealed weapons permits. 13 PAPD adult conviction data only. 14 Deposit equivalent to the estimated full amount of the fee required. 15 Applies to all lots established after January 1, 2005, and to lots established prior to January 1, 2000, with no prior history of electric service. 16 Applies to all lots established after January 1, 2005, and to lots established prior to January 1, 2000, with no prior history of electric service. 17 Plus $27.00 billing charge. 18 Plus $27.00 billing charge. 22 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. • Projects less than 500 kW $600.20 • Projects 500 kW and larger $1,809.30 Residential Service Cancellation Fee19 $396.05 Additional Review, when required20 $150.00/hour Work without a permit 2X permit fee Grading and Filling: Description: Fee Less than 100 cubic yards $1,470.00 100 to 250 cubic yards er less $?�A9 2 940.00 251 to 1,000 cubic yards $3;504-W 3 920.00 1,001—10,000 cubic yards $34 4-90 3920.00 • Plus, an additional amount for each additional 10,000 cubic yards $1,'�01,176.00 Projects that have no hard surfaces or utilities proposed will 0_4 be charged a prorated cubic yard fee based on the factor Additional plan review for changes, additions, or revisions to approved plans $95.10 98.00/hour Clearing and Drainage: Description: Fee Less than 7,000 SQFT $1470.00 less 7,000 SQFT t4aA to one acre $00 2 940.00 Over one acre to five acres $39 3,920.00 Plus, each additional 1 to 5 acres over 5 acres $','r ^� 29 1 J76.00 Projects that have no hard surfaces or utilities proposed will be 0_4 charged a Rrorated acre fee based on the factor Additional plan review for changes, additions, or revisions to approved plans minimum one hour 21 $95.10 98.00/hour Stormwater Public Works and Utilities Department Fees: Description: Fee Annual O&M Private Property Stormwater: • Inspections during normal business hours (the minimum charge shall be 2.5 hours $ 6 245.00 ($95.10 98.00/hour) Source Control Program: • Source Control Program per PAMC 13.63.095 $140.00 $22�A0 $95 9/hour Engineering review, if required: • Stormwater MR 1-5 Threshold $380-40 392.00 (+$95:10 98.00/acre) • Stormwater MR 1-9 Threshold $784.00 (+$196.00/acre) Sewer/Water Capacity Analysis: Description: The fee for wastewater/water modeling shall be the City's cost, including but not limited to professional service fee to run the model staff time for review, taxes and other applicable costs incurred by the City. 19 See PAMC 13.12.010(D). 20 A third or subsequent review of any application or any part of any application. 21 Hourly costs include supervision, overhead, equipment, hourly wages, and fringe benefits for the employees involved. 23 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Right -of -Way Fees: Description: Fee Permit for Construction or Excavation Work in the City Right -of- a22 • Curb and Gutter Removal/Replacement $665:70 686.00 • Driveway Installation $665-.70 686.00 • All Other Work $665.70 686.00 Street/Alley Pavement Cut -With Traffic Control $4046.401,176.00 Base Minimum $95:40 98.00/SQFT Street/Alley Pavement Cut W/O Traffic Control $955.90 882.00 Base Minimum $95.40 98.00/SQFT Inspections $964-0 98.00/hour Building move permit fees: • Relocate building on same lot/parcel w/o use of Right -of- Way. $490.20 196.00 • Move the building from one City lot to another $4, 44-.201,176.00 • Move building from Outside City Limits to Inside City Limits $4,444.201,176.00 • Inspection Fee $9540 98.00/hour Right -of -Way License, Master Permit, or Facilities Lease - nonrefundable filing charge $95.40 98.00 Right -of -Way Use Permit Fees: Description: Fee Be^GbeS Re $255.0 $285 30 Private Planters $29&W 294.00 Landscaping Higher than 30 Inches $285 30 294.00 $30 Exhibitions civic, charitable, or non-profit organization) $225.0023 All Other Exhibitions $47 .W 490.00 Sidewalk Cafes $570-.W 588.00 Activities not specifically mentioned W4 60 490.00 Ramps, Steps, or any Similar Installation $570L.W 588.00 Fences $570.60 588.00 Retaining Walls $570-.W 588.00 Rockeries $570-.-60 588.00 Temporary Street Use Permit $57-G-.W 588.00 Obstruction of URGpeRed Streets Ri ht-of-Wa $570.60 588.00/ ear Obstruction of Unimproved Right -off -Wa 294.00/ ear Utility Pole and Street Light Standard Attachments $570:60 588.00 Communications 686.00 Utility Service and Connection Fees: Finance Department Utility Charges: Description: Fee Account deposit Single Service $250.00 22 Permit fees shall also include the cost of restoration, if applicable. 23 With the approval of the Director of Public Works and Utilities based upon the civic and community benefit of the event and only applicable for events where no admission or participant fees are charged. 24 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Account deposit Multi Service $425 300.00 Utility connections/reconnections and automatic connects: • Utility connections/reconnections during regular hours $25:8A 30.00 • Special emergency connects or disconnects outside of regular hours $130-00 150.00 • Automatic connects pursuant to property owner agreements $15.00 Garbage utility service $15.00 Utility service Electric R-03, GS-03, GD-03, NP-03, and PS-03 $30.00 Collection fee for delinquent utility bills: • Field collections $24400 30.00 • Certified mail collections $20.00 Penalty fee for unauthorized utility services $200.00 Credit check fee required under PAMC 3.64.0306 $50.00 Industrial Wastewater Pretreatment Fees: Description: Fee Fees for monitoring, inspections, and surveillance procedures Actual City cost Wastewater discharge permits for industrial users $2,160.00 Fees for flows that exceed the permitted concentrations: • BOD $0.79/1,000 gallons with concentration greater than 400 m /L • TSS $0.36/1,000 gallons with concentration greater than 400 m /L Fee for IU permit transfer $420.00 Fee for IU permit modification initiated by user $420.00 Fee for waste (septic, occasional, or other) hauler discharge permit $150.00/year Volume fee: The monthly charge shall be as follows: Septic waste, per gallon $042 0.18 Other waste, per gallon $0:05 0.10 Leachate, per gallon $0.02 Electric Utility Service: Rprtriral Residential Work Permits and Fees. Including Inspections and Applicable Taxes. Description: Fee Service/feeder 200 amp. $4-90 196.00 Service/feeder 201-400 amp. $245.20 225.00 Service/feeder 401-600 amp. $29630 294.00 Service/feeder 601-1000 am $399 9 392.00 Service/feeder over 1000 amp. $475-.50 490.00 Branch Circuit with Service Feeder $5-.30 6.00 Branch Circuit without Service Feeder $95-49 98.00 Each Additional Branch Circuit $a-W 6.00 1-4 Branch Circuits $4254-0 147.00 Temporary service/feeder 200 amp. $95-40 98.00 Temporary service/feeder 201-400 amp. $490-20196.00 Temporary service/feeder 401-600 amp. $2 5. W 294.00 Temporary service/feeder 601-1000 amp. $380:40 392.00 Hourly Inspection Fee $95:40 98.00/hour Sin al circuit/limited energy 1 and 2 family dwellings $954-0 98.00 Signal circuit/limited energy multi -family dwellings $954-0 98.00 Manufactured Home Connection $490.20196.00 25 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Renewable Electrical Energy 5 KVA System or less $490.20 196.00 Single and Multi -Family Dwellings - First 1300 Square Feet $498:�9 196.00 • Each Additional 500 Square Feet $47-.-55 49.00 Each outbuilding or detached garage $95.10 98.00 Each swimming pool or hot tub $400-20196.00 Low -voltage thermostat $95 40 98.00 • Each Additional low -voltage thermostat $5.30 6.00 City Lockbox for access to the electric meter $285-.W 294.00 Each Additional Inspection or Site Visit is required for enforcement or safety violations. $95.10 98.00 Requests by propertyowners to inspect existing installations $490.20196.00 Addition of up to four circuits $954-0 98.00 Electrical Non -Residential Work Permits and Charges, Including Inspections and Applicable Taxes: Description: Fee Service/feeder 200 amp. $2374-5 245.00 Service/feeder 201-400 amp. $265.75 275.00 Service/feeder 401-600 amp. $332.85 343.00 Service/feeder 601-1000 amp. $427-95 441.00 Service/feeder over 1000 amp. $623.05 539.00 Branch Circuit with Service Feeder $5-.60 6.00 Branch Circuit without Service Feeder $954-0 98.00 1-4 Branch Circuits $425:49 147.00 Each Additional Branch Circuit $5:30 6.00 Temporary service/feeder 200 amp. $409.20196.00 Temporary service/feeder 201-400 amp. $23746 245.00 Temporary service/feeder 401-600 amp. $265-.W 294.00 Temporary service/feeder 601-1000 amp. $332 85 343.00 Hourly Inspection Fee $954-0 98.00/hour Sign/outline lighting $142.65 147.00 Signal circuit/limited energy -commercial first 1,500 square feet $190.20 196.00 • Each Additional 1,500 square feet or portion of commercial $5.60 6.00 Renewable electrical energy 5 KVA system or less $190.20 196.00 Each swimming pool or hot tub $237.75 245.00 Low -voltage thermostat $95.10 98.00 • Each additional low -voltage thermostat $5.60 6.00 Each carnival ride and generator truck $95.10 98.00 Each remote distribution of equipment, concerts, or gaming show $47.55 49.00 First field inspection each year or a single concession or ride, not part of a carnival $237.75 245.00 • subsequent inspection of a single concession or ride not part of a carnival $142.65 147.00 Berth at a Marina or Dock $95.10 98.00 • Each additional berth inspected at the same time $95.10 98.00 Industrial Block Permit $3,328.50 3,430.00 Each additional inspection or site visit is required for enforcement or safety violations $142.65 147.00 City lockbox for access to the electric meter $285.30 294.00 Requests by propertyowners to inspect existing installations $190.20 196.00 Addition of up to four circuits $95.10 98.00 Pole attachment rate $95.10 98.00/contract 26 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Special Emergency Connects of Disconnects: • Regular hours $95.10 98.00 • After regular hours $237.70 245.00 Water/Sewer/Storm Service Connection Fees: Description: Fee Water system development charge per number of equivalent water meter factors for the services to be installed. $2,260.00 New residential water installation service ce.pneetion fee, including the meter and all applicable taxes: • 1" service size / 5/8" meter $2;500 2,800.00 • 1" service size / 3/4" meter $2-,d00 22 800.00 • 1" service size / 1" meter $2,600 22 800.00 New residential water installation service to drop- in a meter when service connection is not provided by the City $420.00 520.00 New commercial/industrial water installation service seenestien fee, including the meter and all applicable taxes: - • 1" service size / 1" meter $44&00 22 800.00 • 1 'h" service size / 1 '/2" meter $3,565.00 4,900.00, or the City's cost, whichever is greater • 2" service size / 2" meter $3 5565.00 4,900.00, or the City's cost, whichever is greater • 3"-6" service size / Y-6" fire -rated meter $5,800.00 9,800.00 or the City's cost, whichever is greater Special emergency connects or disconnects: " • Regular hours $7�00196.00 • Non -regular hours $430-.W 294.00 Water quality test fee $78:00 98.00 plus laboratory tests Water deficiency investigation (non -regular hours 24 $235 00 245.00 Installation and removal of a temporary service $200.00 245.00 Installation and removal of a temporary fire hydrant meter $450-00 490.00 Water meter test: • Deposit for testing 5/8-inch to 1-1/2-inch meters $50.00 • Deposit for testing two-inch meters and larger $70.00 • Test fee Actual cost minus deposit Sewer system development charge; $2,260.00 2,860.00 x total number of equivalent water meter factors for the services to be installed WUGA wastewater connection charge $5,200.00 plus the product of $2,150.00 x remainder that results when 1.0 is deducted from equivalent water meter factor Connection Permits: • Single -Family Houses $665-.70 686.00 • Multi -family dwellings, including duplexes, apartment buildings, trailer and auto courts, motels, and similar structures: • First dwelling unit $665-.70 686.00 • Each additional dwelling unit $4-0 : 147.00 • Commercial $666-70 686.00 All other structures and associated additions: 24 If it is determined that the deficiency is the result of improper operation or maintenance of the customer's plumbing, a charge will be made to defray a portion of the cost of responding to the request. 27 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. o First 100,000 square feet $0-.005 0.01 / ross square feet o Remaining footage in excess of 100,000 square feet $0.0025 0.005/gross square feet • Additional direct connections to a public sewer, equal to the initial connection $686.00 • Reconnection to public sewer using existing side sewer, equal to initial connection $686.00 RepaiF to the Side Sewef Capping Side Sewers $850.00 Storm Sewer Connection Fees: • Lincoln Street storm sewer connection char e25 $7,096.00 • Milwaukee Drive trunk sewer connection char e26 $150.00 • Ediz Hook sewer connection char e27 $9,574.62 • Upper Golf Course Road sewer connection char `e $1,964:20/connection Storm Drain Connections: • Installation of catch basins or similar interceptors $665:-70 686.00 • All connections other than for a catch basin $665.70 686.00 Tapping sewer or storm drain main lines to install a tee or wye $665:70 686.00 Upon Request, Underground Utility Work Performed by the Public Works Department Descriotion: Fee U. fl _ Fire hydrant installation $3; 70--00 6,600.00 Miscellaneous Utilitv Charaes: Description Fee Restoration of any street, alley, curb, sidewalk, utility, or other City structure altered or damaged by sewer or storm drain connection construction. Actual City Cost Developer reimbursement agreement application processing fee $2,500. DO 2,744.00 Developer reimbursement charge administration costs28 5% added to each charge 25 For each platted lot that contains 500 square feet or more of impervious surface. 26 Multiplied by the equivalent wastewater service factor. 27 28 Multiplied by the equivalent wastewater service factor 28 Minimum of $20, maximum fee of $500 28 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Miscellaneous Public Works and Utilities Department Fees and Charges: Description Fee Construction inspection: • Inspections during normal business hours $964-0 98.00/hour • Inspections outside normal business hours (two-hour min) $285.50 2 .00($44z?50 147.00 /hour) Engineering review, if required: • Linear feet LF of water pipe $2:50 4.50/LF • Linear feet LF of sewer pipe $2-.50 4.50/LF • Street/alley/parking (linear feet of centerline, LFCL $0-.W 4.50/LFCL Additional review, when required29 $9540 98.00/hour Recreation Facility Fees and Charges: Recreation Fees: Description Fee Dnrcnn�l R�nnorc$135.00ANeek, City Pier Moorage: • Overnight moorage at the transient moorage facilities $20.00/night • 24-hour moorage at the north pier moorage area: 0 0 — 100 feet $100.00/ni ht 0 100 —150 feet $150.00/night 0 150 — 200 feet $200.00/night 0 200 — 300 feet $300.00/night Ediz Hook Public Boat Launch: • Daily permit $10.00, tax included • Annual permit $50.00, tax included Field Fees: • Non -Parks and Recreation Department Softball Tournaments Elks Playfield and Shane Park $75.00100.00/day • Youth clinics, camps, or academies $45:90 20.00/hour Fun runs •iaILc• Vor Burton walk (S Unh as badMin+nn$1.00iPeFsGA basketball, or walking gre Vern Burton pickleball $45 00 50.00/year4o$2-.00--per- $250.00Aeam • Arl �I+ has Lo+h +II .-.a�crrcvv�c�T�curr 0%team • Youth basketba $250.00/team Port Angeles Senior and Community Center Membership Fees: 29 A third or subsequent review of any application or any part of any application. we Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. • Annual Full Membership Rates (ages 55+ : o City Resident $16.00/ ear o Non -City Resident $25.00/ ear • Annual Associate Membership Rates (ages 45-54 : o City Resident $18.00/ ear o Non -City Resident $27.00/ ear Public Space Merchant Permit: • Non -waterfront parks and facilities $25.00/day or $250.00/month • Waterfront parks and facilities I $75.00/day or $400.00/month Citv Facilities Rental Fees Description Category 1 Category 11 (Non- Category ❑I Damage Deposit rafit)Profit Set up/Clean up by City employees $50.00/hour City Hall Council Chambers and Lobb Area City Resident =No Charge $15.00 20.00/hour , $2&00 30.00/hour $50.00 Non -City Resident I No Charge $�?50 30.00/hour I $307N 4f1.00/hour 1 $50.00 Vern Burton Memorial Community Center Fees - City`'Residents Main Hall (Gym) No Charge $25.00 30.00/hour $45.00 50.00/hour $150.00 or or or $300.00/2+days $ 0 300.00/day $450.00 500.00/day 10+hours 10+hours Kitchen No Charge $20.00 25.00/hour $30.00 35.00/hour $50.00 or or $75.00125.00/day $200.00/day maximum maximum Small Meeting No Charge ,' $20.00 25.00/hour $27.00 35.00/hour $50.00 Room or or $75 00 250.00/day $215.00 350.00/day 10+hours) (10+hours Large Meeting No Charge $225.00 30.00/hour $38.00 45.00/hour $50.00 Room or or $200.00 300.00/day $300.00 450.00/day 10+hours 10+hours Vern Burton Memorial Community Center Fees - Non -City Residents Main Hall (Gym) No Charge $37.50 50.00/hour $67.50 70.00/hour $150.00 or or or $300.00/2+days $375.00 500.00/day $675 00 700.00/day 10+hours) 10+hours Kitchen No Charge $30.00 35.00/hour $45.00 50.00/hour $50.00 or or $112.50 200.00/day $300.00 350.00/day maximum maximum 30 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Small Meeting No Charge $30.00 35.00/hour $40.50 50.00/hour $50.00 Room or or $225.00 350.00/day $322.50 500.00/day 10+hours 10+hours Large Meeting No Charge $37.50 45.00/hour $57.00 60.00/hour $50.00 Room or or $300.00 450.00/day $450.00 600.00/day 10+hours 10+hours City Pier, Gateway , and West End Park City Resident No Charge $400�0125.00/da $450.00175.00/da $100.00 Non-Cit Resident No Char a $4%.40175.00/da $225:00 250.00/dayl $100.00 Lincoln Park Clubhouse City Resident No Charge $20.00/hour or $20.00/hour or $50.00 $200.00/day $200.00/day 10+hours 10+hours Non -City Resident No Charge $20.00/hour or $200.00/day $20.00/hour or $200.00/day $50.00 10+hours 10+hours Lincoln Park use and Loomis and Jessie Webster Park Facilities Cam fire Clubhouse City Resident No Charge $20.00 25.00/hour $30.00 35.00/hour $50.00 or or $200.00 250.00/day $3004A0 350.00/day 10+hours 10+hours Non -City Resident No charge $30 )0 35.00/hour $45.00 50.00/hour $50.00 or or $300.00 350.00/day $450.00 500.00/day 10+hours 10+hours Port Angeles Senior and Community Center Rental Rates - City Residents Multi -purpose No Charge $35.00/hour or $45.00/hour or $150.00 Room $350.00/day $450.00/day 10+hours 10+hours Kitchen No Charge $40.00/hour or $55.00/hour or $150.00 $400.00/day $550.00/day 10+hours 10+hours Dining Room No Charge $30.00/hour or $40.00/hour or $50.00 $300.00/day $400.00/day 10+hours 10+hours Small Meeting No Charge $15.00/hour or $35.00/hour or $50.00 Room $150.00/day $350.00/day 10+hours 10+hours Large Meeting No Charge $25.00/hour or $38.00/hour or $50.00 Room $250.00/day $350.00/day 10+hours 10+hours Lounge Addition No Charge $25.00/hour or $35.00/hour or $50.00 $250.00/day $350.00/day 10+hours 10+hours Port Angeles Senior and Community Center Rental Rates - Non -City Residents Multi -purpose No Charge $52.50/hour or $67.50/hour or $150.00 Room $525.00/day $675.00/day 10+hours 10+hours Kitchen No Charge $60.00/hour or $82.50/hour or $150.00 $600.00/day $825.00/day 10+hours 10+hours) Dining Room No Charge $45.00/hour or $60.00/hour or $50.00 $450.00/da $600.00/da 31 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. (10+hours) (10+hours) Small Meeting No Charge $22.50/hour or $55.00/hour or $50.00 Room $225.00/day $550.00/day 10+hours 10+hours Large Meeting No Charge $37.50/hour or $57.00/hour or $50.00 Room $375.00/day $570.00/day 10+hours 10+hours Lounge Addition No Charge $37.50/hour or $52.50/hour or $50.00 $375.00/day $525.00/day 10+hours 10+hours Civic Field City Resident $40.001hoeof $400 09 600.00/day (10+hours) $60.00/heuf of $600-.90 800.00/day (10+hours) $4-509 200.00 Non -City Resident $4-5A 200.00 32 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. Copying Costs and Other Miscellaneous Fees Fees for Copying Records" Description Fee Police Records: • Accident Report Copy No Charge • Case File Photos See Non -Police Fees Below • Crime report copy o Victim No Char e o All others See Non -Police Fees Below • Dispatch Tape Copies See Non -Police Fees Below Non -Police Records Fees: • Paper Sizes/T es:31 o 8'/2 x 11 - black and white, per page $0.15 o 8'h x 11 - color/side, per page $0.25 o 8'h x 14 - black and white, per page $0.15 o 8'/2 x 14 - color/side, per page $0.30 0 11 x17 - black and white, per page $0.15 0 11 x 17 - color/side, per page $0.50 0 18 x 24 - black and white, per page $3.00 o 24 x 36 - black and white, per page $6.00 o 36 x 48 - black and white, per page $9.00 o Zoning code, per page $0.15 o Comprehensive plan per page $0.15 o Shoreline Master Program per page $0.15 o Budget - black and white per page $0.15 o Budget - color/page per page $0.50 c Municipal Code Book/ a e, per page $0.15 o Municipal Code Updates per page $0.15 • Plotted sizes/types: 0 18 x 24 color $5.00 0 24 x 36 color $10.00 0 36 x 48 color $15.00 o Larger plotted sizers/s uare foot $2.00 • Transmitting records via facsimile: o Up to ten pages32 No Charge • Providing records on electronic media: o Digital storage media or device provided by the city Actual Cost o Customer -provided thumb drive or external hard drive33 No Charge • Providing records by mail: o Container or envelope Actual Cost o Postage or delivery charge Actual Cost 30 Copying fees are waived if the total charge would be less than $5.00. The City may require a deposit of up to 10% of the estimated costs of copying or scanning records. 31 All fees are per page, per document, unless explicitly noted, including copies made by someone other than a City employee using City equipment and facilities. 32 Documents longer than ten pages will not be faxed. 33 Must include signed waiver. 33 Exhibit A - Only those fees noted as follows are being adjusted: deleted, new or changed. All other fees remain as is. e Copies provided by an outside source Actual Cost e Utility service consumption history per request $1.00 e Conversion of electronic formats $0.10/page e Scanning to electronic format $0.10/page e Pages greater than 11 x 17 in size/1 5-minute increment $30.00 e Preparation of GIS maps/data/1 5-minute increment34 $35.00 Miscellaneous Fees and Charges Description Fee Checks submitted to the City with insufficient funds (NSF checks $40.00 Notary Public Fee/Certification $5.00 City Clerk certification per certification $5.00 Deed processing per recording Actual Cost Coin recovery permit $5.00/year/person 34 Maps or data that require extensive processing time or require additional ink and plotting supplies will be charged at a higher rate. 34