HomeMy WebLinkAbout903 E Park Ave - Building
d'''''~
'tv;
"Ii....."
CITY OF PORT ANGELES
PUBLIC WORKS - ELECTRICAL DIVISION
121 EAST 5TH STREET. PORT ANGELES. WA 98]62
ELECTRICAL PERMIT
Issued: 3/30/99
Permit No:
6591
OWNER/AP~>LICANT------------------------PROPERTY LOCATION----------------------~-
KENT BRAUNINGER 903 PARK AVE E
903 E. PARK Lot:
Port Angeles, WA 98362 Block: Long Legal:
360/000-0000 Sub:
T: S: Parc No:
CONTRACTOR-----------------------------DESIGNER---------------~-----------------
ANGELES ELECTRIC
524 E. FIRST ST.
PORT ANGELES, WA 98362
360/452-9264
,
000/000-0000
PROJECT INFO--------------------------------------------------~-----------------
prj Type: RES. MISC.
Occ Type:
Occ Grp: Occ Load:
prj Value: $0.00
Cnstr Type: HOT TUB
Lan9 Use:
Electrical Heat
Baseboard KW:
Furnace KW:
Heat Pump KW:
Fan/Wall KW:
o
o
o
o
Service Type
Riser
X Overhead Service
Underground Service
Temp Service
Voltage: 120,240
Diameter: X-I -3
Service size:' 200 AMPS
Feeder Size: 0 AMPS
PROJECT HOTES---------------------------------------------------------------____
9KW HO'J~ TUB
PROJECT FEES ASSESSMENT----------~-----------------------------____---__~_______
~ervice: $0.00
Additional Feeders: $0.00
circuit Wiring: $0.00
Temp Service: $0.00
Misc HOT TUB $42.50
TOTAL FEE:
Amount Paid:
$42.50
$42.50
-------------~-------------------
-----.----------------------------
--------------------------
TOTAL FEE:
$42.50
Balance Due:
$0.00
COMMENTS/ACTION NEEDED
ELECfRICAL PERMIT INSPECfION RECORD
CALL 417-4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINJMUM 24 HOUR NOTICE. IT IS UNLA WFUL TO COVER.
INSULA TE OR CONCEAL ANY WORK BEFORE IT IS INSPECTED AND ACCEPTED.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
[NSPECTlON TYPE
DATE
COMMENTS
NO
~
GENERAL COMMENTS:
PW.I 102.13 14I96l
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N?
15462
p-';;c; . ;:;:;-
Port Angeles, Washingtonhh'hn.m.nnnnmnmnn......mmnmnmnnn. 19..m:n
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec-
trical equipment in, on, or about any building or other structure in the City of Port Angeles, per-
mission Is hy33~ntet50 V~al work as listed below.
~~::s..:::::~~~i~~:~~~:::...~~~~~~.n_c.~:::::::::::::::::::::::::::::::::~:::::::::::::
WIlIng Contractor .mn..hm....m...nnn'nmnnnnnnnnhh.nn.n.._ By nnmn._._.''.hhhnh..h..mm''.___.n..nm.hh.h...n..
Light Outlet"---....h..mm_________....__..______ Service, volts ..../j!~__?/-:?./'.._~. Type of Wiring:
R t 1 0 t1 t No wi es . Armored Cable m__m..___....m.........
eClep ac e u e s....___m___.................. . . r. ..--...y~---O.~....ml-J.....
/L ~ Non-Metallic .m........__m...__...........
Dryer, KWI........m.___.......h.___m.m.u Size wIres..;;.-...../' ..--.....;;;./f...........
~(/71 Knob & Tube......m........___.............
::~:rK:e~~~;-:nu------m :I:~::::: :::::~::::::::::::::::::: Rigid Conduit _________________..m._____
MetalI1c Tubing ..onm............
KW-nnn:J7'i..tJBu--.--u--.
Heat: RW.......m__.................................
Type of wiring:
Entrance Cable ...___.......................
Raceway
Motors: size, volts and phase:
Rigid Conduit ........__..............____...
MetalI1c Tubing _____...m...______.......
Current transformers:
No. & Size...____.___________.._____.__.__.....__
Circuits. LighL...................____...........___
Utility .__.......m..........._.......____.........
Heat
Ser. No.....__.....__......______..........____......
Range .....................__._.____....._____.____
Water Heater ...........m.......m...m.
Motor ...__._....................___............._
Dryer..__..____.__.__................................_
Ser. No.....__......__..u_..........................
Ser. No.............____...........................__.
Furnace _______.________.........'_..................
Total Load.__________._______...______. Ser. No..____...........__..____......______...__.___ Total ........__..........__._...............
Remarks: .",-:?~.~~.n.:-:.~mj'm.&c.t;,~m.nc:'!::..cf.....J.~~--:'::m..nnn.mnnmnh..
Permit Fee
$.n_mm...nm______m...___mm_
Treas. Receipt
NO....m.m.m.nnmmm
By nnn___..nn___n.nm.m..h.hm..hnm.hhh.n.m.m__.___
NOTICE-Current must not be turned on until Certificate of Inspection has been issued. It worlt is to be con.
cealed due notice must be given the Inspector so that work may he inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
ELECTRICAL PERMIT
N?
15462
Date called for inspection.....__................_....... ....................._..._......_........................__...............................................................__..._................
Preliminary inspection dates.........__....._.........._ .............................~.........................................................._.........._........._.._...._...................
Inspectioncompleted..._.__.._.......____.___...........____......':..,-::::::.:.:.........~.................................................._......................._......._......_........._......_.
Total Load ......u.__..n.__..................h_........_......................n__.............._ ...
1M 3-72 Oly.mpic Printers, Inc.