HomeMy WebLinkAbout535 Rose St - Building
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
Nt?
16769
Port Angeles, waswngton______L_=-_.2J::.________....___.......______., 19.2:1'"
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec-
trical equipment In, on, or about any building or other structure In the City of Port Angeles, per-
mission is hereby granted to do electrical work as listed below.
S"J5
Address .-------------;jz-----a .---------------------------.---------------------- Occupancy____.4-L~Sl..__-------.------.--------
~~7:: ~~e::;-:::::-- --. ~ .=::::::Z~~~::~~;::::::::::::::---.--:~::::::::::=::::::::::::::::::::::::::::=:::::::::
("'!
Light Outlets.._.....______._________...___._.____... Service, volts /~..;f!.::q
Receptacle Outlets............................... No. wires m::~,ij;;P'"
Dryer, KW nm.nhn__nh..hn...._n......n... Size WlreSh.~~~~~.......n........_..
RLnge, KW _______________________. Main fuse <.. .....__.._.:1.A...__....
Enclosure ____~...z.&5?..
~"ater Heater:
H,.al~:~:::::_c.;;?l..:.t"4;;::.-
Type of wiring:
Entrance Cable ....n..m...mn..
Motors: size, vol~s t" Pha:v
(([:..~f?/---.~...-..----...
Rigid Conduit ...h.mmnm......m.....
Metallic Tubing ._m__...........
Current transformers:
No. & Size.n.................nn..n
Ser. NO..nnnn....n.............n..n_.....n.._
Set. NQ. n.n.n..nn................n.nn........
Ser. NO..nn__n..n................____n__..._.....
Total Load............m._m_m__...
Ser. No. nn..nnn.___................nnn.__....
Remarks: _______________.__________________________________________________...._____________________________.....______________._______________________________._____
Total.............__....._........_..._.._._
Type of Wiring:
Armored Cable ........h....................
Non-Metallic .....__..........._..........__..
Knob & Tube__.....___......____..............
RIgid Conduit .._____......._.___..__......._
Metallic Tubing .mm..mm..mm_.__
Raceway ..............................._._.__
Circuits, Light.............._......._......___._....
Utility .n...nnnn...._.nn.....n.n....._.....
I-Ieat ....._................._....._........_......
Range ....._._._................n.................
Water Heater _._.........._._.n.._n.......
Motor .............................................
Dryer........................................_......._
Furnace .........__.___d........._......_..h.......
Permit Fee
Treas. Receipt
No.__....__________.____.....__
t:;~ ~ ~--
" .,.' ... f
BYr ':_____ _:..___~(:;,L:.....____'2:,,____
$---...-------------------------..-----
NOTICE-Current must not be turned on until Certificate of Inspection has been issued. It 'Work is to be con.
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
ELECTRICAL PERMIT
,"
N?
16769
Address.................................._.............___............................_.........................._................._._.........Date..._......._.~_.._.._.........._......_......_.........
\ '
:::: ~~~;~~~~:~:::::::::::::::~::::::~::~::::::~::::::~::~:::S~~:::::::::.:.::::::::::::.:-::::..:::-::::::::..~:~-a_~t.:~:::::::-:::::.:::::::::::::::::::::::::::::::.::::::::::::::::
NDtICE-CUrrent must not be turned on until Certificate of Inspection has been issued. It work Is to be con-
_'":) cealed due notice must be giVen\the Inspector so that work may be inspected before concealment.
\
1M Olympic Printers, Inc. \
,
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N?
15457
Port Angeles, WaShlngtonuuu..z.-:.u_~__:.u_._u._um.__.m.umumuu, l~)
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec-
trical equipment in, on, or about any building or other structure in the City of Port Angeles, per-
mission is hereby granted to do electrical work as listed below.
j' J' ;, 'a--",- t?~
Address -u._.__uu.m.mmoooo'7777.__.m_uu__._______u__oooo__uuuu_uuu. Occupancy_....L.t.".,____m____u_u._oouuu..___.._
Owner _oo4~_~um:.(1"~!:~_____rmmu TenanL._.___._.oooou____oo___oooo____m___oooooo______m.umu_m_____
Wiring Contractor oo.m._(,2m.u(fueg::<;~r(;c_-_mu_m_ Byu_oo.____oo_._u_________.___m____u.______u__m.______u_..___..
Light Outlets....m.m.....m...................___. Service. volts ./~..9../.'?:..f!..'F'::i Type of Wir1~g:
-::> '
N I .:J Armored Cable .....m........m.....m..
l O. \Y res ..00.....00..00......00.___00.......00. /
?1~~ -!-. ~<t' f ",'f' /,' I' Non-Meta111c .mm..............m.........
Size wiresm........m.:.:.....:::......m:..: . <:
. -r /J d
Mam fuse ..n..:3..t;!mmm:J_.m..._
Enclosure .........Cm.l(~_._..n__
RJceptacle Outlets................mnmnnm
Dryer, KWj __..nnn.......... .....n...............
Rcnge, KW..........
""ater Heater:
H,.,K:;-:::r-::./3IJ::':
Motors: size. volts and phase:
/J
~ ~~:::~f'f~!.!~:q~;~:~~
Total Load.nm..mn..m-...-......
Type of wiring:
Entrance Cable ..mm._mm_.........m
Rigid Conduit .n.....___....................
Meta111c Tubing _m___mm........m...
Current transformers:
No. & Size.n..n.nunnn..n..n.nn....._..
Ser. NO..n.._...........n.........._nn...........
Ser. No..................._.._____....................
Ser. NO.__n_.._nnn...__..n...nn._....h...._u
Ser. NO.........nn........nnn.._...........n_..
Knob & Tube
Rigid Conduit ....m...nmnnnn...n'"
Metallic Tubing ....n.......n...n..n.n
Race\vay ...nnnn.nnnnn..nn.............
Circuits. Ltght....nn.._..........._.._..._hnm..
Utility ......_...._00__..__........____00_0000000000
Heat
Range _n_n..__.n_nn..nnn.._nnn_nn_nn
Water Heater nn..n.......nnnnmn...
]'fotor ............h_........................_n...
DI)..er..nnn__.....nn....n_........nn............
Furnace 0000_.._....000000.._00_.'_.___ .
Total............................._.........
Remarks: .m________.___..__________._____oo_______uu.____mmu_____m.._______m_uuu_muu______________m_mm_uu_____._.m___n___mm_____oo
.;::;~.;::--.mmnmm..m.m.--;~:~:.n;:~:;~~m--------m.-uumumnoo--~$::u~~uft~---dm------m-"?
$.____________________m_u_.m__u.. NO....mmm_m__m___m. By .m.'oo______.u____.::____oo':.___.___."::_~~._.,........,
NOTICE-Current must not be turned on until Certificate of Inspection has been issued. If work Is to be con.
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
ELECTRICAL PERMIT
N?
15457
:Lnte called for inspection............_.......___..............................____....._....___._____._..............._______.....__.______....._________._....._____.__________................_....
Preliminaryinspecttondates............__._......__...___..h_.__.._____.____..___._.~_.__....._.....___._......._....__.._.___._.__......._____..........._.____.....................______._........
InspecUoncompleted...____________.________._.___.______._______.____.____...._____._.___...__........_________._____.......__u____u__.......___________._.........______...__.._.._._._.._...._
1M 3-72 Olympic Prinlers, Inc.
Total Load ....n..nnunnnnnu....u...._nnn_.__..._...u._._.._nn.............__._........d