Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout123 E Front St - Building O
ELECTRICAL PERMIT -
CITY OF PORT ANGELES
360-4]7-4735
Application Number 10 00001196 Date 10/15/10
Application pin number 522236 REPORT STATE SALES TAX
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000 on your excise tax form
Application type description ELECTRICAL ONLY to the City of Port Angeles
Subdivision Name
Property Use (Location Code 0502)
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 0
Application desc
Photo cell exterior lights
Owner Contractor ^�-
CLALLAM TRANSIT SYSTEM OWNER J v
830 LAURIDSEN BLVD
PORT ANGELES WA 98363
Permit ELECTRICAL ALTER COMMERCIAL (\f(\J
Additional desc
Permit pin number 175612
Permit Fee 73 50 Plan Check Fee 00
Issue Date 10/15/10 Valuation 0
Expiration Date 4/13/11
Qty Unit Charge Per Extension
1 00 73 5000 ECH EL BRANCH CIRCUIT WO/FEEDER 73 50
Fee summary Charged Paid Credited Due
Permit Fee Total 73 50 73 50 00 00
Plan Check Total 00 00 00 00
Grand Total 73 50 73 50 00 00
INSPECTION TYPE DATE. RESULTS INSPECTOR.
DITCH
SERVICE
ROUGH IN -7—('5A TIR
FINAL
COMMENTS
PERMIT WILL EXPIRE SIX(6)MONTHS FROM LAST INSPECTION
Signature of owner or Electrical Contractor X Date
IWO
n�r-rW ` 0�.PORr.t,ti,�
u v/IRS
CITY OF PORT ANGELES PERMIT APPLICATION OCT 1 Zs��� `"�
Building Division/Electrical Inspections �-
321 East Fifth Street—P.O.Box 1150/Port Angeles Washington,98362 ELECTRICAL
Ph (360)417-4735 Fax. (360)417-4711 INSPECTIONS
Date. /D !z- !
1 &2 Single Family Dwelling _Multi-Family or Commercial* commercial Addition/Alteration/Remodel/Repair*
*Plan Review May Be Required Please Complete Electrical Plan Review Information Sheet
Job Address: !z3 IL FfLDN-"
Building Square Footage:
Description of above _j:tJ,- g t-, c)e p t;I !�31-:A LL P-d an CN_. L-
Owner Information Contractor Information
Name: C-1-ce aF %12!!7f A46FA- 3 Name:
Mailin ress: 37,1 Y Mailing,Address:
City State:_ Zip: City State: Zip:
Phone: Fax: Phone: Fax:
License#/Exp. License#I Exp.
Item Unit Charge Qtv Total(Qty Multiplied by Unit Charge)
Service/Feeder 200 Amp. $119.90 $
Service/Feeder 201-400 Amp. $145.50 $
Service/Feeder 401-600 Amp $204.60 $
Service/Feeder 601 1000 Amp. $262.20 $
Service/Feeder over 1000 Amp. $372.50 $
Branch Circuit W/Service Feeder $ 2.60 $
Branch Circuit W/O Service Feeder $ 73.50 $ Z 3
Each Additional Branch Circuit $ 2.60 $
Temp Service/Feeder 200 Amp. $ 92.70 $
Temp.Service/Feeder 201-400 Amp. $110.30 $
Temp.Service/Feeder 401-600 Amp. $14870 $
Temp.Service/Feeder 601 1000 Amp $167.90 $
Portal to Portal Hourly $ 95.90 $
Sign/Outline Lighting $ 88.20 $
Signal Circuit/Limited Energy/First 1500 sf-Commercial $ 95.90 $
Note: $5.00 for each additional 1500 sf
Signal Circuit/Limited Energy 1 &2 Family Dwelling $ 63.90 $
Signal Circuit/Limited Energy Multi-Family Dwelling $ 63.90 $
Manufactured Home Connection $119.90 $
Renewable Electrical Energy 5KVA System or Less $102.30 $
Thermostat $ 56.00 $
NEW CONSTRUCTION ONLY.
First 1300 Square Ft. $110.30 $
Each Additional 500 Square Ft.or Portion of $ 35.20 $
Each Outbuilding or Detached Garage $ 73.50 $
Each Swimming Pool or Hot Tub $110.30 $
$ -2'3 Total
Owner as defined by RCW 19.28.261 (1)Owner will occupy the structure for two years after this electrical permit is finalized (2)Owner is required
to°hire an electrical contractor if above said property is for sale, rent or lease. Permit expires after six months of last inspection
After reading the above statement, I hereby certify that I am the owner of the above named property or a licensed electrical contractor I.am making
the electrical installation or alteration in compliance with the electrical laws, N E.0 RCW Chapter 19.28 WAC Chapter 296-46B,The City of Port
Angeles Municipal Code,and Utility Specifications and PAMC 14 05 050 regarding Electrical Permit Applications.
Signature of owner electrical contractor or electrical administrator O Cash ❑ Check
El Credit Card#
X � Dated: �O��v' —<C/ 0110112010
F
ET CODE:
3!0-DiV APPROVAL_..
ELECTRICAL PERMIT
CITY OF PORT ANGELES Q
360-417-4735 s
Application Number 09 00001052 Date 10/13/09
Application pin number 834776
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000
Application type description ELECTRICAL ONLY
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 0
Application desc
Surveillance system
Owner Contractor
CLALLAM TRANSIT SYSTEM HI TECH SECURITY INC
830 LAURIDSEN BLVD 723 E FRONT ST
PORT ANGELES WA 98363 PORT ANGELES WA 98362 ,
(360) 452 2727
Permit ELECTRICAL ALTER COMMERCIAL \ N
Additional desc
Permit pin number 154971
Permit Fee 75 00 Plan Check Fee 00
Issue Date 10/13/09 Valuation 0
Expiration Date 4/11/10 1N`
Qty Unit Charge Per Extension
1 00 75 0000 ECH EL-LIMITED 1ST 1500 SQ FT 75 00
Fee summary Charged Paid Credited Due
Permit Fee Total 75 00 75 00 00 00
Plan Check Total 00 00 00 00
Grand Total 75 00 75' 00 00 00
G
V
�1
INSPECTION TYPE DATE RESULTS INSPECTOR.
DITCH
SERVICE
ROUGH IN P ZS d�j
FINAL
COMMENTS
Signature of owner or Electrical Contractor X Date
FROM HI-TECH ELECTRONICS FAX NO. E C W %U Oct. 09 2009 12 03FM P1
ti
OCT 12 2009
c>r y'sur,tti
City of Port Angeles Permit Application `,
ELECTRICAL `�J.
Building DtvfsloNfaactrica)Inspeclivns �y;
321 East F[Rft Street-P.O.Box 1150 INSPECTIONS
Port Angeles Washington,9888Z
Ph:(360)4174735 Fax:(360)4174711 j 41 1
Date:__to -q-
1
q-1 &2 Singly Fa n O
.t Multi Family mmercral' '�
Commercial Adtiitio��on/Renwdei/Repair
Plan Review May Be Required,Please Complete Electrical Plan Review Information Sheet
Job Address; 10 Asrr oar
Building Square Footage: - N
Description of above_�-'�TP^r-�-_ 5a]Fel1t'1 ll f--g- Sy y_7IF Wv- ,35.+a(j 42"L"C-t-%kat
_.cO►9�Ia�7`T
Owner Information Contractor Information
Name: P`t-ojjr,-lV-Y -V'0 S' r- Name:. Hi Tech Security Inc
Mailing Address: tz3 94Sir fir :^ MailingAddiess. 723 East Front St
City- PA- State: WA. ZIp:�Q_ � City. Port Angeles State: wA.....-,Zip: 362
Phone: a t Phone; 360 452 2727
License itiiExp- _ Lieensefl/Exp, HITECTS955BS
Unit Chane iota((QN Milti»liec by Unit Cbacael
S 93.75 S-� _Setvi wFeeder200 Amp.
$113.75 __- 5 ServicelFeader 201.600 Amp.
5160,00 S. .. ServicelFaeder 401.600 Amp.
5205.00 $ ServkoTeedar 901-1000 Amp.
$291.25 5 ServkOeeder over 1000 Amp.
$ 2.00 5 Stanch Circuit W/Service Feeder
S 57.50 $— Branch Citcuit W10 Service Fmciev
5 2.00 5- Each Additional Breech Circuit
S 72,50 S Temp-Service/Feeder 200 Amp,
5 86.25 S Temp.ServicalFeeder 201-MO Amp.
$116.25 $ Temp,Sane celFeedar 401 00 Amp.
$131,25 S Temp.ServiceiFeeder$01-1000 Arne,
5 75.00 5 Portal to Portal Hourly
$69-00 $�SigOOulline Lighting
S 75.00 � S y'S-UC+ Sign4 0(eu d limited Energy Carenereial
5 50.00 5�Signal CirctW Limited Energy 1 a 2 Fermly Dwelling
5 50.00 $ signal Cuctud Limited Energy MultrFamily Dwelling
$ 93.75 S. MULfacturedHomeConnection
S 80.00 5 Renewable Electrical Energy-5KVA System or Less
S 80,25 S Fn
11300 Square Ft
S 27.50 $ GachAddihonal500 Squate Ft or Poftion of
5 57.50 S Each Outbuilding or Datacheo Garage
$ 96.26 S Each Swimming Pool or Hot Tub
$ 43,75 SThermostat
Total
Owner as dented by RC V.1i28.26i:(1)Owner wig occupy the structure fa two years after this deehfcw permll is finalised(2)owneris requited ra Me an
electrical contractor if above said property is for safe,rent or lease.
Atter reading the above statement,I hvraby cartify that i am the owner of the above named propedy or a licensed electrical contractor.i am making the electAcal
Installation or altaration In compliance with the etecWcal jaws,N.E.C.,RCW_Chatter 1928,WAC.Chapter 296468,The City of Pod Angales Municipal Code,and
Utility specttiications.
Signature of owner,electrical contractor or electrical administrator
X Date: jib Q 0
„ j "� •� ;a Ff
a � `J �j � te1, � ��• ?�
etc .!+° r;•`” �"' a iu�r
jil
Jsfr a,,
Vl -
i " 5b
tt�
ell
LPrI5
r r"
Application Number 08 00000963 Date 8/12/08
Application pin number 071883
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000
Application type description ELECTRICAL ONLY
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 0
Application desc
Phone network
Owner Contractor
CLALLAM TRANSIT SYSTEM ANGELES COMMUNICATIONS INC
830 LAURIDSEN BLVD 102 ROSS LN
PORT ANGELES WA 98363 PORT ANGELES WA
PORT ANGELES WA 98362 ^ `
(360) 457 4375 'V
Permit ELECTRICAL NEW COMMERICAL
Additional desc
Permit pin number 131797
Permit Fee 40 00 Plan Check Fee 00
Issue Date 8/12/08 Valuation 0
Expiration Date 2/08/09
Qty Unit Charge Per Extension
1 00 40 0000 EL LOW VOLT SYS <=2500 SQFT 40 00
Fee summary Charged Paid Credited Due
Permit Fee Total 40 00 40 00 00 00
Plan Check Total 00 00 00 00
Grand Total 40 00 40 00 00 00 7
.lam
V
SPECTION ELECTRICAL
TYPE DATE RESULTS INSPECTOR
DITCH
SERVICE
ROUGH - IN
FINAL
COMMENTS :
Application Number 08 00000733 Date 6/19/08
Application pin number 080981
Property Address 123 E FRONT ST
ASSESSOR/PARCEL NUMBER 06 30 00 5 0 0043 0000
Application type description ELECTRICAL ONLY
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 0
Application desc
Low voltage
Owner Contractor
CLALLAM TRANSIT SYSTEM OWNER
830 LAURIDSEN BLVD
PORT ANGELES WA 98363
Permit ELECTRICAL NEW COMMERICAL
Additional desc ^�—
Permit pin number 128520 ,\,
Permit Fee 40 00 Plan Check Fee 00 ' �+
Issue Date 6/19/08 Valuation 0 ( _�
Expiration Date 12/16/08
Qty Unit Charge Per Extension
1 00 40 0000 EL LOW VOLT SYS <=2500 SQFT 40 00
Fee summary Charged Paid Credited Due It1d
Permit Fee Total 40 00 40 00 00 00
Plan Check Total 00 00 00 00
Grand Total 40 00 40 00 00 00
d
G
V
INSPECTION ELECTRICAL
TYPE DATE RESULTS INSPECTOR.
DITCH
SERVICE
ROUGH — IN
elope
FINAL
� a)
COMMENTS :
CITY OF PORT ANGELES
PUBLIC WORKS ELECTRICAL DIVISION
�i 321 FAST 5TH STREET WORT ANGELES.WA,98362
Application Number 07 00000731 Date 7/30/07
Application pin number 176216
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000
Application type description ELECTRICAL ONLY
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 0
Owner Contractor
CITY OF PORT ANGELES OLYMPIC ELECTRIC
32.1 E 5HT' ST 4-230 TUMWATER
PORT ANGELES WA 98362 PORT ANGELES WA 98363
(360) 45'7' 5,303
Permit ELECTRICAL TEMPORARY SERVICE,{
Additional, desc OLY EL / 200 .A TEMP`
Permit ,pin number 1'05171
Sub Contractor OLYMPIC ELECTRIC N
Fee
Permit 58 00 Plan`Check Fee 00'%
ELECTRICAL PERMIT INSPECTION RECORD
CALL 4174735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MIND 24 HOUR NOTICE. ITIS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE ITIS INSPECTED AND ACCEPTED.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED co?*mFNTS
YES NO
DITCH
SERVICE
FINAL
GENERAL COMMENTS:
ELECTRICAL WORKPERMITAPPLICAITON
Ins tion
Job wiry!by *learr cal Contractor ❑Owner j�Comaaetrial O Residential
Elcetncal ca tmcc//ttlpptt name
License number Date Expires
�t^
C 7N -4V1-5 TvG L TRC2 t(n8$A /�Altered/Addition
purchaser's mailing address
11 z8 FiP Wt?14ce
City StalC ZIP
S2R TT4El WA ci8383 At2 FA MAV)L7;F-7;F -
Telephone ntimbeT FAX number
20(0 423 — /(00 ?,Ofp 3z 9,
Premises owner's name 1 //l� 7�p–�]�l� y rJ k2N4llc�r rFl &A•it tJdti[ <idl.JU J
Address of!12-3 E,Inspection RE
CEIVE® 1
cuy�
Yn.a-T Amuse%s JUN .Z 8 7QQ8
Phone numhler to schedule inspection:
Owner as de� ctned by RCW 19.28.261:(1) Owner will occupy the simcturejor two
years after A elerical permil Is finalized (2) Owner is required to hire an efecrrieat LIGHT DEPT.
contractor if bore said property is jor sale, rent or leans. ❑Cash ❑Check#
After reading the above statement,I hereby certify that 1 am the owner of the above '
named property or a licensed electrical contractor. I am making the electrical instal- Credit Card Vtaa Mastercard Discover
lation or alts ation in compliance with the electrical laws, N_E.C., RCW Chapter
19.25, WAC. Chapter 296-468, The City of Port Angeles Municipal Code, and Card#
Utility 4P cl cari000. I A — –` -–
Sig turce own ' r tr a contractor or electrical administrator F_Yplrah07l Date
X Date: o ofcard $specNon f
r tr .Service Irdorl WL1q l
ANO LOAL7 CHANGES
0 Baseboard —KW Voltage
4 Fumace KW Q Overhead Service Phase(3 10 3
Q Meat Pump _Ton_LAR Q Temp Service Service Size:
Q Fan-wall J KW _ Q Underground Service Feeder Size:
SAME DAY INSPECTION. CALL BEFORE 7:00 AM 360-417-4735
(:?`/C��UGA-IN THERMOSTAT SERVICE
6-236
Date Apr�ey nota apnmvee 6Y nae Ayr .d Ey
FINAL Dnru FEEDER
M �— Appnvea By Dsle Appy
Inspect) m Area,Building or Equipment fnspeeted Electrical
Date Action Takes Inspector
i
i - -
ELECTRICAL WORKPERNMAPPLICATION
-2163 �a F
Installation description
Job w red by �Electrlcal Contractor ❑Owner �Commercld O Residential
Electrical contractor name License number Date Expires *New ❑Altered/Additlon
'r N E o �l 1
Purchaser Is mailing address `�Br�OfO Y�S�a�� ��0/dE 1 �C.rNfdIC.K O
J02, IIROJS LA/ 1
city State ZIP
Iront1 <i.t �✓.� 9/�L 3 _ ���i.✓�, �l
Telephone number PAX number
4S y3 S S -P if
Premis&.4-re owo er's name
r �7fD0 S� fT
Address of Inspect) n
/23. E 04RoAv'10'
city
d � Ari
Phone number to schedule Inspection:
Owner as defined by RCW,19.28.261:(I) Owner will occupy the structure dor two
years aft this electrical permit Is finalized. (2) Owner it required to hire an electrical
comracto i/above sold property is for sale, rent or lease. ❑ Cash ❑ Cheek#
After read ing the above statement, I hereby certify that I am the owner of the above
named Property or a licensed electrical contractor. I am making the electrical instal- }�Credlt Card Visa MasterCard Discover
lation ar alteration in compliance with the electrical laws, N.E.C., RCW, Chapter
19 28, Wr,�C. Chapter 296-46R, The City of Port Angeles Municipal Code, and Card#
Utility Sdeci Fications.
Slg owner, electrical contractor or electrical administrator Expiration Date Inspections
Date: 8 7-08 of card $ O
Electrical Load Addltlons and or subtractions service information
❑ NO LAD CHANGES
Q Base Oartl _KW Voltage
❑ Fuma�a _KW ❑ Overhead Service Phase❑ 1 ❑3
❑ Heatump _Ton_LAR 13 Tamp Service Service Size:
13 Fan- all _KW El Service Feeder Size:
SAME DAY INSPECTION CALL BEFORE 7:00 AM 360-417-4735
ROUGH-IN THERMOSTAT SERVICE
APp aYpue Ap— pmveA�tl y Dam Appmvrd by
FINAL DITCH FEEDER
!I7
Dme A..-"6y D.m APpr..d By EDam Approved By
Inspection Area,Building or Equipment Inspected Action Taken Electrical
O ate Inspector
I
06/18/ 007 16: 47 3604523498 OLYMPIC ELECTRIC RA GE 01 r
�-10i1�t ELECTRICALWORKPERMTrAP.PLICATION '
Installation description
Jab tatted by M E/lectrlcal Contractor O Owner Commercial O ReafdentJal
Ucense number Date Expires New D Altetzd/Addldon
Electrical aontraetor name OA`s"
p�tt mailing address
.�' r
city Braine ZtP
Telephond number PAX number
Premised owner's name
Address of oapeello¢ -
/.�f F40H� s
cl,y
Phone n¢mber to schedule lasaeetlent
or two
Owner mi daffeed by RCW)9,28.761:(1J Oa'"nOnn,A4 eNqJ�°o him mr electrical
yaea gilds th4 cl«vlm!peradr.Ujilnaloed(2J own 13 cash
Cl Check#
contractor 11,shoe said property tr far rola, rens or bare
After tesd{ng Ws%be"statement,I hereby cetyl -that 1 a ng ormer of the above UC,edit Card vim Mastercard Discover
named property or a lioenaed electrical eotdraetor. I am making the slLCW.al chapter
lido¢of alteration in:compliance with the electrical laws,N.E.C.,ItCW. Cheater —�--
_ ]g18,rflAC. Chapter t9"B,The City or Port Angela Municipal Code,and Cdrd# 1111
1
11
Utility $pecifioe6add.
ExpirationDeta 1¢speenen ere
signature of ear,electrical contractor or electrical adAdair r of card
X `
Date: ' ' 7 c,�le� v>m align
— od Addltlona and or atlbtraoSlGnB '' ''•• //'' --g
Meg
5-NO LOAD CHANGES Vohage L, L
O Baseboard —KW Cl Overhead Service Phase O 9
❑ Purhacts KEN % amp ServiceServhQ SIU
.20-0—
O Heel Pump _Ton LAR `(O Underground Service Feeder SUe:
C1Fdr-Well —KW
SAME DAY INSPECTION CALL BEFORE 7:00 AM 360417-4735 SERVICE
ROUGR4 V 7WYMOSTAT
DM ny`p,arm y� Mrc
— FEMER
DITCR
->r�'/ Opt nese e
Prover
Electrical
'InspectionArea,Building orPqulpmed lnVoctod Action'hke¢ Inrpeear
Date
9J
�y
JUN 0 2007
UM DEPT.
2009-1237992
Page 1 of 1 Protct Covenant
Port Angeles City Of
Clallam County Washington 06/05/2009 09 44 04 AM
When recorded return to Bill �"� � � • �� ",1#1 KAF-i 11111
City of Port Angeles DCED e a��( `�I
P.O. Box 1150 > �� U
'� pN o
Port Angeles, WA 98362 ` �� Z 2 � ` 0� oo�
ZONING LOT COVENANT
The CLALLAM COUNTY TRANSIT AUTHORITY being the undersigned owner of
the following described properties
Parcels #063000509020 0630005000030 063000500050;06.3000500060
063000500062, 0630005000430 and 0630005000460 commonly identified as.115 123
and 125 East Front Street.
do hereby covenant that said property shall be designated as one zoning lot as defined in..Section
17 08 130 `Z" of the Port Angeles Municipal Code This covenant creates one inseparable
building lot which may my be removed through compliance with Chapter 58 17 RCW
(subdivision regulations) and/or the City of Port Angeles short subdivision regulations
(Ordinance No 2222, as amended)
This covenant shall be binding on the owner heirs, assigns, and successors in interest and
shall be filed with the County Auditor's Office This covenant is for the mutual benefit of said
owners, heirs, assigns, and successors in interest and is for the further purpose of compliance
with state and local land use and building regulations. This covenant may be enforced by
inunction or other lawful procedure and covenant by the recovery of any damages resulting
from non compliance
DATED this day of --1-r
20 Of
Print Name Xe� &vim iral J"20
fl /
,/'Signature)
Phone 5&o- 4/s t -:3
STATE OF WASHINGTON) ss
COUNTY OF CLALLAM )
I �_ /'ix i_ // >°/ -Notary Public in and for the State of Washington,do hereby
certify that on this y! da of' v� 200 personally appeared before me
�'/p y W-P known to me to be the individuals)described in and
who executed the kithin instrument and acknowledged that ( ( signed and sealed the same as 40
free and voluntary act and deed for the purposes herein mentioned c�
GIVEN UNDER 4YIiAE f7 ANT 0Fj:Il✓IAJ_ SEAL this _�day of 20�1
N AiZdUBLIC m /c' For the State of
C k✓n,f-i rton resid ng at Pu ,geles.
j (11/24/2009) Linda Pangrle RE. Geographic ID for Property ID 80882 Page 1
From Jodoin Starla' <sjodoin@co clallam wa.us>
To 'Linda Pangrle' <Lpangrle@cityofpa.us>
Date 11/24/2009 2 14 PM
Subject: RE. Geographic ID for Property ID 80882
063000500040
-Original Message-
From Linda Pangrle [mailto Lpangrle@cityofpa.us]
Sent: Tuesday November 24 2009 11 56 AM
To Jodoin Starla
Subject: Geographic ID for Property ID 80882
Hi Starla,
What is the Geographic ID for Property ID 80882 (115 E. Front St.
Clallam Transit System)?
Please let me know as soon as possible
Thanks
Linda Pangrle
Permit Technician
City of Port Angeles
321 E. 5th St.
Port Angeles WA 98362
360-417-4815
360-417-4711 FAX
I pang rle@cityofpa.us
Clallam County Assessor& Treasurer - Property Details - 80882 CLALLAM TRANSIT Page 1 of 3
Clallam County Assessor & Treasurer
Property Search Results > 80882 CLALLAM TRANSIT SYSTEM for Year 2009 2010
Property-
Account
Property ID- 80882 Legal Description W 40' LT 2, LTS 3-5 E 1/2 LT 6
BLK 1 AND LT 2 SP V16 P30
Geographic ID- Agent Code
Type Real
Tax Area. 0010 PA 121 H2 L Land Use Code 97
Open Space. N DFL N
Historic Property- N Remodel Property- N
Multi-Family Redevelopment: N
Location
Address. 115 EAST FRONT STREET Mapsco
PORT ANGELES WA 98362
Neighborhood Map ID-
Neighborhood CD-
Owner
Name CLALLAM TRANSIT SYSTEM Owner ID- 18307
Mailing Address. 830 LAURIDSEN BLVD %Ownership 100 000,0000000%
PORT ANGELES WA 98363
Exemptions.
Taxes and Assessments Due
Property Tax Information as of 11/24/2009
Amount Due if Paid on .
Statement Taxing First Half Base Second Half Base Amount
Year ID Jurisdiction Due Base Due Penalty Interest Paid Due
NOTE If you plan to submit payment on a future date make sure you enter the date and RECALCULATE
to obtain the correct total amount due
Values
(+)Improvement Homesite Value + $0
(+)Improvement Non-Homesite Value + $0
(+)Land Homesite Value + $0
(+)Land Non-Homesite Value- + $0
(+)Curr Use(HS)- + $0 $0
(+)Curr Use(NHS). + $0 $0
(_)Market Value = $0
(—)Productivity Loss — $0
(=)Subtotal: _ $0
(+)Senior Appraised Value + $0
(+)Non-Senior Appraised Value + $0
(_)Total Appraised Value. _ $0
(—)Senior Exemption Loss: — $0
(—) Exemption Loss. — $0
http.//vpn.clallam.net:8084/propertyaccess/Property.aspx?cid=0&year=2009&prop_id=8 11/24/2009
(6/15/2009) Linda Pangrle Gateway Pag'
From Ken Dubuc
To: UndaPangde
Date: 6/15/2009226PM
Subject: Gateway
Linda
Clearly mymemory isshot.
Itwas November of2OO8when[fina|edthe FAsystem atGateway
Thanks,
'
Ken
From UndaPangde
To, Ken Dubuc
Date: 4/20/30081'45PM
Subject: Fire Alarm Permit #08'05 for 133 E Front St. (Int'1 Gateway Transit Cth
Hi Ken,
/
I don't remember getting an answer from you regarding the below e-mail that I sent you on 03-17-09 Pleas�let me know
when you did your final fire inspection approval nnpermit#O8'OS '
Thanks,
Linda
>»> Linda Pangdo]/17/ZOO9 1'43 PM p»>
Hi Ken,
DnHTE lsee that you approved afinal fiesprinkler(permit#V8-34)inspection onlO'17'VO. How about the fire alarm permit#O0'
057 Please let moknow when you did your Mna|fire approval onpermit#O8'O5
Thanks,
Linda
v\
L
\"\Y�
v `- ,*,m-
` p
. �
When recorded return to
E C Ep � VV i
City of Port Angeles DCED ,
P.O. Box 11.50 JUN — 4 1009
Port Angeles, WA 98362 DepTof�CoF P
mmOunRT,tyANity.®0`,e I
ZONING LOT COVENANT
The CLALLAM COUNTY TRANSIT AUTHORITY, being the undersigned owner of
the following described properties.
Parcels#063000509020, 0630005000030, 063000500050,063000500060,
063000500062, 0630005000430, and 0630005000460, commonly identified as 115 123
and 125 East Front Street.
do hereby covenant that said property shall be designated as one zoning lot as defined in Section
17 08 130 "Z"of the Port Angeles Municipal Code. This covenant creates one inseparable
building lot which may only be removed through compliance with Chapter 58 17 RCW
(subdivision regulations) and/or the City of Port Angeles short subdivision regulations
(Ordinance No 2222, as amended)
This covenant shall be binding on the owner heirs, assigns, and successors in interest and
shall be filed with the County Auditor's Office. This covenant is for the mutual benefit of said
owners, heirs, assigns, and successors in interest and is for the further purpose of compliance
with state and local land use and building regulations. This covenant may be enforced by
injunction or other lawful procedure and covenant by the recovery of any damages resulting
from non compliance.
DATED this V�5 day of ---�rt4)qe' ,20_�2L
tQ .
Print Name: _le"r r� � �'-� 60K vd 111a n��ey'
a'Signature)
1
Phone ;3&O - lk5o-- 3/s
STATE OF WASHINGTON) ss
COUNTY OF CLALLAM )
I, >°i Notary Public in and for the State of Washington,do hereby
certify tha on this '`/ da of 2002,personally appeared before me
7 �P known to me to be the individual(s)described in and
who executed theAthin instrument and acknowledged that (P signed and sealed the same as
free and voluntary act aniq decd far,-the purposes herein mention
GIVEN UNDER MTVA I-D;f N-D": 'F' IAL SEAL this D—day of 20 b
er a 1'ARY UBLIC in and for the State of
Washi ton residing at Port Angeles.
L• /�
r,
Gateway Parking Stall Count
Area Type Number
Plaza Free 3 Hour 16
Permit 37
Handicap Standard 4
Handicap Van 2
Sub-Total 59
West Garage
Lower Long Term 58
Upper Long Term 32
Permit 10
Free 3 Hour 16
Sub-Total 116
On-Street,Parking Handicap 2
TOTAL Stalls 177
S8 3-0. 9,-O.
9'-0' STAIR
ST1
STAIR 10 i --- - __•� --- - -- ---I i RISER RM I
D
T/SLAB EL 17-1 �TYP. S8 I PGot
© -------- ------- — —
I 1
I I
C ___________________
I ----------------- -------- --
------------------ __---- -
-------- --------- ----------------- __
J L <
_______________ ____________ __
1 Tip ----Z-----J---- -------- I- -------- --- -------- - `'S ��----- -- - ' $9
------- -------- J
I I I I I I
-
5 AT�8
i
%I�I I i•`� `- e � _J 5' :iLAB E :NF i I
I = TRENCH
DRAIN 4
II
I }
S5 30 STALLS ®9'-0' _ $qT,r, 4
II I I N O
•,. ,?, _ —
i EST PARKING
GARAGE -"- Al Al Al Al 1 SLOPE _
LOWER.LEVEL q1 Al CA�
PGt 30 STALLS A 9'-0" C
UPNARCUND
I I SLAB SAW-CU r JOINTS -
I I
I I
ill - - _ -
I I N
3 RIM EL i
= r � 2a• r.� I I I
L'I Ft'!• y I I I I I I I -- - 1
li I I I mss . I _n
J L --- - ------- -------- -------- ------------- 1
i
I 1
------
..J Ij L ____J I -------
-
_ L __�_____ __ --------___-____ __ _____________-------------
10
__ _______ I — _
- ------------- -- - -------- -----L - ---- ------- ------ ------ ------- -- -- ----- -- ` _
L
'I C' _ --=--- --------------------- ---------------------
59
----------------- --------.-- ----- ------------ -------- - SIM 7
------------- --------------- --- I - C
___-- © ___ © PART PLAN 'B"
8
.+rr: PART PLAN A
PART PLAN 'C' I 58 s9 i.,4�'``. si , ,
\PAR7 PLAN 'D' r�:.`.,�,.�3Jwi,f�:ta�,tF4,�
9'-0
ou
'LAN - l �C �S
. ° f
IN ACCORDANCE WITH "' -
o Pte► �- Few f looms
r
3 au rWeS�
�
K � I
290'-3'
36'-0' I 36'-0' 17'-5'
20'-10' 36'-0' 36'-0' 36'-0' 36'-0*
uj
I I uj
a
I I o
I I I 1 I I •
I �
w
I
T/SLAB R. 27'-10'
STAIR I NOTE 3 _� o
' CLOSJRE ------- .- - c�1
In I
o
N I I CLOSURE
-- _ i �_� G_._ -
I
.-_..V � �J1
/]� --_- (Qj I I i 1 I I I It�ll ; 1 I ; I I I _.-_ I �•J�
I 1 1 rl ® I +I I II 11 -V_-__ 1 1 1T II'II �tv I I
\J 1 I ILII
'll it I I I
1 r. 11•"+1
I 11 1 1 I I III I.I < ;i� 1I, III III I� III III I i I I I w
III I I�I 1'I I I I 1 1 I I
---
I I
I " I I I I I I III III I I 4 I I I I I•I I I I. I I I I I I I i l;
I ' r, t l 1 1 iIi I I I I 1 - r •L..'
I © II, 1 1 III 11 II1 1 1 III
17 I 17
I I \ 1 1
MVT. SLAB 17u1 F'1II114D I I 1 1 I I I I S7O6�PT. SLABiiii VARIES SLOPE;L'�
FF=VARIES i i i i I I I i i — l i III © I F—L-a
-WEST
U PERI LE*IRAGE i i — — I
ti l i C' III Qp I I I I i i p
1 -
j
S7
I 1 1 1 I•I I I I I , I I - I I II III I I I j I j �. I ; 1 I � ' I I \
I I 1 1
I I IT, I� ' � 1�• I iIi �t ; ; I I i i ,�u. i i SHs IW i i i i i i _ 1 1 I ; � III � ;II I M
Lj
IOI I �
Y ®I ; N , ST RMI 1 O
o.
I hp
NOTE 4 NOTE 4
I T/�qB p I RIMEL /T/SLAB EL 26'-9'
_ 26'-8' T/_CURB EL
26 912'
/ ,t-... --'�- -- _ _•� •iy.r>'�„fit rI; ,A,T
I
1 I I
I 20'-0'
1
-
A,
1 I
I 20.-0. 2a © I^ c
0 0
N
---- -1-_ _-- _ - I ------_- -- --- --_ --_ -
®� ^
1t
BUILDING M WAY
I I
iI MING
BUILDING m
1
I
I F
TWO WAY 1 r-r W
1
-75
1 I J
V I M
1
1 2'-0' L 22'-3' $STRIPM,TYP J
Aw
VATOR ---
ENT ROOM UP
o
NO) II
13 19 -� '© oW`r tB S E M
UN iA
3-STALLS®_s eiocraMCAL
RAs
A0.05 �j6VAN
ACCESSIBLE ` `: OUITLIKE I
%H-� niiinnnmnnbI� , , PLAZA ABOVE
OPEN TO 20'-8' 9--a-
ABOVE I r 7'-a' 7'-' '
3 _
Fx 30
0000�0000000o i
eta'-o. .-0. o
I � I
co
v
/ r
q 4
A --_-_---_-
_—_— -�.0 9NfWm f ------- -—
I
-_--- -fie-- -_� - --�
/ Hyo
a COLUMN
�j 111
���
/��py 24'-0' z' 24'-0' '
MONK I • I M
TO O
P.T.DECIQ. N {
7. NR J 7 NR
-
F-��(It SERRM 5A O Sot3 STOR RM -—-—-
ERD
®
E ECT4 STALLS 0 10'-0' - 4 STALLS 0 10'-0' -7-71
1
EWRNG WALL ALONG
FRONT STREET
I I
I 1
I I I
1 33'-4' 1 59'-4' 54'-10"
274'-0" to Atm 1 C�
� I
4) V P"D
u
1
14 I6
(6/16/2009) Linda Pangrle The Gateway two certificates of occupancy, Page 1
From Linda Pangrle
To tweed@clallamtransit.com
Date- 6/16/2009 8 41 AM
Subject: The Gateway two certificates of occupancy
Attachments: The Gateway Two Certificates of Occupancy pdf
CC: Nathan West
Hi Terry
Per our phone call,attached are copies of the Certificates of Occupancy for The Gateway As you requested,I will mail
you the originals.
I'm sure The Gateway facility will be useful to many people for many years. Congratulations on completing it.
Linda Pangrle
Permit Technician
City of Port Angeles
321 E. 5th St.
Port Angeles,WA 98362
360-417-4815
360-417-4711 FAX
Ipangrle@cityofpa.us
rr
CERT PIANCY
y ,,A
y'd'f"P'
ort Angeles. - `BluildilnD 'sion.
This certifzcate:-is'lssue pqi atztk4q_the,requiremenis.vf Section II O:of'fhe 20 International Building Code
certing'that at the t e,of zsuazice t7�rsszructure was in.conliance with.the v zous ordinanc�s..ofthe City
fregulating buildingc nsrutznaraorcuirtg..
fti , P
Business name The,''Ga`feway-l",t Msit,,0ffV e / Paui h,en,„/�Ur,0,66i nd Parking;
Business address 123_F Front St. (.OAwr�er, lallam:Tr sit System)
er s "� 'Property ownOallam Tra'nst S� stem
A � ,
Property owner s: esi' ” 830 W Laiilee�iB`frF?cxrtAigl'es'ti*W r 98363
Automatic fire..spri 10t; tem RequiredWin-
w,
r.,
Use &occupancy cZ ass at16n. Business Assern,bl /=.;Sto.ra. e `
Buildzizg permit nunz er 0.6
n '
Type of construction r _
Occupant load. 3 �, - -_
a. `r 06-16-09
xSue- t 6 Mager
Date
Post on the premises in a conspicuous €dace. Th sfieafe s'haii not be removed except by the Builujng Officia
— < , ,._
e '
-o7
ECEHE
RT NGELFS O �
JUN t 0 2009
w. CITY OF PORT ANG
ELES
W A S H I N G T O N U S A Dept.of Community Development
PUBLIC WORKS & UTILITIES DEPARTMENT
Date June 10, 2009
To Nathan West, Building Offi ial
From. Jim Mahlum, Civil Engine
Subject Building Inspector's Final Inspection for Gateway
An inspection was preformed by Jim Lierly on 6/05/09 and the following are required before a final inspect can
be approved Comments and corrections are included in bold letters and the attachments.
1-A copy of the third party special inspection report of the wall, located under PB3 beam shall be required
specifying test strength and conformance with engineer design
A copy of the inspection report is attached with email correspondence,from the Engineer of
Record,approving substitution material
Although the cylinders have not fully met the required 4000 psi strength as of today, it is
expected to reach that around the 12 to 14 day mark. I have attached a graph of indicating the
normal curve and shown what the current testing is today
2 A copy of the testing report for the exhaust fan in the lower parking area of the plaza Stating that it meets
or exceeds the rates specified in the 2003 IBC.
A copy of the testing report and letter is attached.
3- Provide the for ADA provisions for ANSI 117 and chapter 11 of the 2003 IBC. Signs shall include tactile,
color contrast and location height as per code. The Building department is not required to regulate Federal
ADA rules. However I must inform you that you are responsible for the provisions of the ADA Federal
regulations. If you would like i can meet with someone on site to more clearly demonstrate the code
requirements
As per Jim Lierly's email (attached) the signage is up to code. The only issue is the fountain. As
the attached email indicates it does meet ADA standards but not the standing person standard.
The question that Public Works has are:
1. is the fountain a requirement?
2. can it be signed as ADA accessible only?
The Public Works is willing and committed to make this compliant to the building codes.
4- Sand bags located at the rear entrance for the Harbor Town Mall?? Is there a flooding or water problem?
In commercial construction, site water cannot flow from private property onto another Provide means for
N\PROJECTS\97 20 Gateway\25 Close Out\Building Inspector's requested Reports.doc
water to flow into proper storm drainage.
The sand bags were not placed by the Gateway project, but by the owners of the Harbor Town
Mall. There is a flooding problem, at times, but the water comes FROM the Harbor Town Mall,
NOT from the Gateway project. This has been an on going issue by the owners of the Harbor
Town Mall which Bob Coons has tried to address with them. Any flooding issue is NOT caused by
the Gateway project.
5-The electrical panels in the lower garage have no impact protection This is required for all service panels,
meter base and appliances.
Bollards will be installed by our street crews with approval by Trent Peppard.
NAPROJECTSM 20 Gateway\25 Close Out\Building Inspector's requested Reports.doc
;'(6/1'0/2069)Jim Mahlum Meeting for the correction items Page 1 a
From James Lierly
To: Glenn Cutler; Jim Mahlum, Nathan West; Sue Roberds
Date: 6/10/2009 9 52 AM
Subject: Meeting for the correction items
Attachments: imagesJpg
Jim,thank you for your time this morning. Here is the details you requested.Also i have received my interpretation for the
call buttons outside the elevator car They do not need the tactile signage.The code does not differentiate from the
two locations but i have received the clarification for this item.The Drinking fountain details are as below and a photo has
been attached.
602 Drinking Fountains
602.4 Spout Outlet Height.Spout outlets of wheelchair
accessible drinking fountains shall be 36
inches(915 mm) maximum above the floor Spout
outlets of drinking fountains for standing persons
shall be 38 inches(965 mm) minimum and 43
inches(1090 mm) maximum above the floor
Jim Lierly
Building Inspector
City of Port angeles
360-417-4816
jlierly@cityofpa.us
Strength of Cylinders
6000
w�"w ,.,��� F a �'�> t "�# "."��` "i rt j .,�..�«��^�� ;�.,."fit `+' •�"�~r
"'� �:"• sx:.'E�; y jp >. w._ 'a:� .t�,p.� .... s: - ''"':y;. ,ani �..,_. x5000
...
OR 11
010 An,
rpt'=-_ 3�. '.'�-,��.�:y `�' .`�,; ''�;. �`�',� �liz>v.;•.. �.ti,:,' ,`�, .�`_ "' ��:�� ..�.,,� - .r
a� 4000
�r$ .:may
r;z%n`
- O_
3000- -
'�1".x6 r�"' `,'•s�:- ' - � - ,\\��`• r '�:-kc�u v"��.s- ;s°lh, +,:i�, 'za'a`•,�`prlc:' '�, .a,r,.�Y,`„�.''s."s<�`,,' y '>":`•"p.''d''`.t��".'h 1ry'a� :?t. 5:t
,:.
en th of Cylinderslinders
' 4.
O 2000
.. ;� ciL µ"
V Yt 9 key
two,*
- - o
. z
�y� ;ry
';'s :rl';sa., ax,,... -,., s::�,i„' :. �t•' ::;:�, "�% .., ':�j.��v�.e .:a. :�.,a„t<.
1000 ., . , :
MR
rp
Number of Days
I(6/9/2009) Nathan West Final inspectiori for theYGateway Plaza and garage below _ PageT1�
From James Lierly
To: Glenn Cutler; Jim Mahlum, Nathan West; Sue Roberds
Date: 6/8/2009 1 57 PM
Subject: Final inspection for the Gateway Plaza and garage below
An inspection was preformed on 6/05/09 and the following are required before a final
inspect can be approved.
1-A copy of the third party special inspection report of the wall, located under PB3 beam
shall be required specifying test strength and conformance with engineer design.
2-A copy of the testing report for the exhaust fan in the lower parking area of the plaza.
Stating that it meets or exceeds the rates specified in the 2003 IBC.
3- Provide the for ADA provisions for ANSI 117 and chapter 11 of the 2003 IBC. Signs shall
include tactile,color contrast and location height as per code.The Building department is not
required to regulate Federal ADA rules. However I must inform you that you are responsible
for the provisions of the ADA Federal regulations. If you would like i can meet with someone
on site to more clearly demonstrate the code requirements
4- Sand bags located at the rear entrance for the Harbor Town Mall?? Is there a flooding or
water problem? In commercial construction,site water cannot flow from private property
onto another Provide means for water to flow into proper storm drainage.
5-The electrical panels in the lower garage have no impact protection.This is required for all
service panels, meter base and appliances.
Jim Lierly
Building Inspector
City of Port angeles
360-417-4816
jlierly@cityofpa.us
PREPARED 6/05/09 8 59 21 INSPECTION TICKET PAGE 2
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 6/05/09
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PRIMO CONSTRUCTION INC PHONE (360) 683 5447
OWNER Clallam Transit System PHONE (360) 452 1315 r c.J�
PARCEL 06 30 00 5 0 0043 0000 r) "--
APPL NUMBER 06 00001042 COMM NEW CONST `�
REQUESTED INSP DESCRIPTION IIF ✓ ,—�?/S &L/ T �2 •
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
provide access to remove hvac/roof access ladder sprinkler
is in the way of using ladder safely
BLI 01 6/13/08 JLL BLDG INSULATION
6/13/08 AP June 13 2008 8 57 31 AM 1pangrle
RANDY 461 1391
'EXTERIOR INSULATION' (�
June 13 2008 4 19 05 PM jlierly to
BL3 02 6/13/08 JLL BLDG FRAMING
6/13/08 AP June 16 2008 5 33 14 PM 1pangrle
FRAMING
June 16 2008 5 34 14 PM 1pangrle
BLCG O1 7/30/08 JLL BLDG CEILING GRID _7►'11Yf/�,(, y 'a�J1
7/31/08 AP July 30 2008 8 45 35 AM 1pangrle `���'Y - ,/ •�
RANDY 461 1391 rr
CEILING GRID
July 31 2008 8 26 20 AM jlierly
PW99 01 3/27/09 RV PUBLIC WORKS FINAL C
3/27/09 AP March 27 2009 3 35 12 PM rvess �•
March 27 2009 3 35 32 PM rvess �7�ryJe
BL99 01 6/05/09 BLDG FINAL
—
June 5 2009 8 50 39 AM 1pangrle Ys/v
NATHAN WEST
BLDG FINAL MAIN BUILDING
PERMIT ME 00 MECHANICAL PERMIT , �T
REQUESTED INSP DESCRIPTION // V
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
ME1 D1 6/13/08 JLL MECHANICAL ROUGH IN
6/13/08 AP June 16 2008 5 33 39 PM 1pangrle !�
MECHANICAL ROUGH IN
June 16 2008 5 34 37 PM 1pangrle
ME99 01 6/05/09 L MECHANICAL FINAL
June 5 2009 8 53 19 AM 1pangrle
NATHAN WEST
MECHANICAL FINAL MAIN BUILDING _7
PERMIT PL 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION /J����/ R.,/'�yr• ©�i/y+ /J _ J C �r/�a
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
PL1 01 2/29/08 JLL PLUMBING UNDER SLAB TIME 01 00
2/29/08 AP February 29 2006 8 52 24 AM 1pangrle �nA
RANDY 461 1391 ►�L-
UNDERGROUND PLUMBING
AFTERNOON
February 29 2008 4 14 16 PM jlierly
PL2 01 6/04/08 JLL PLUMBING ROUGH IN
6/04/08 AP June 4 2008 8 18 31 AM 1pangrle /
TODD 301 9945 �.1/.�1/��Y__r�)�f�J
ROUGH IN PLUMBING ON THE PLAZA BLDG
CONTINUED ONTO NEXT PAGE S>
PREPARED 6/05/09 8 59 21 INSPECTION TICKET PAGE 3
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 6/05/09
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PRIMO CONSTRUCTION INC PHONE (360) 683 5447
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
INSPECT ASAP (THE WORKERS LEAVE AT 3 00 PM)
June 4 2008 3 45 12 PM jlierly
PL99 01 6/05/09 PLUMBING FINAL
N June 5 2009 8 53 56 AM 1pangrle
NATHAN WEST
PLUMBING FINAL MAIN BUILDING
COMMENTS AND NOTES
PREPARED 6/05/09 8 59 21 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 6/05/09
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PRIMO CONSTRUCTION INC PHONE (360) 683 5447
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
PERMIT BPC 00 BUILDING PERMIT COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
BLHD 01 4/15/08 JLL BLDG FRAMING HOLD DOWNS TIME 01 00
4/15/08 DA April 14 2008 4 59 32 PM 1pangrle
TOM (CONSULTING ENGINEER) 360 915 4149
HOLD DOWNS TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30 MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
April 15 2008 4 27 32 PM jlierly
missing hold down/verify with engineer the change in type of
hold down/missing nailsin shear/ washer required on sill
plates per code/jll
BL9 01 4/15/08 JLL BLDG SHEARWALL TIME 01 00
4/15/08 DA April 14 2008 5 01 27 PM 1pangrle
TOM (CONSULTING ENGINEER) 360 915 4149
SHEARWALL NAILING TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30 MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
April 15 2008 4 27 32 PM jlierly
missing hold down/verify with engineer the change in type of
hold down/missing nailsin shear/ washer required on sill
plates per code/jll
BLHD 02 4/24/08 JLL BLDG FRAMING HOLD DOWNS TIME 01 00
4/24/08 DA April 24 2008 8 32 29 AM 1pangrle
RANDY 461 1391
HOLD DOWNS
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
April 24 2008 3 36 07 PM jlierly
eng to approve change for different holddowns actually
used/jll
BL8 01 4/24/08 JLL BLDG ROOF SHEETING TIME 01 00
4/24/08 AP April 24 2008 8 36 20 AM 1pangrle
RANDY 461 1391
ROOF NAILING & HARDWARE
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
April 24 2008 3 37 00 PM jlierly
BL9 02 4/24/08 JLL BLDG SHEARWALL TIME 01 00
4/24/08 AP April 24 2008 8 34 44 AM 1pangrle
RANDY 461 1391
SHEARWALL
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
April 24 2008 3 37 07 PM jlierly
BL3 01 6/10/08 JLL BLDG FRAMING
6/10/08 AE June 9 2008 3 08 18 PM 1pangrle
RANDY 461 1391
FRAMING TRANSIT BLDG
June 10 2008 5 05 13 PM jlierly
CONTINUED ONTO NEXT PAGE
(6/4/2009) Linda Pangrle Fwd Gateway Pavilion Page 1 1
From. Nathan West
To: Linda Pangrle
Date: 6/4/2009 3 00 PM
Subject: Fwd Gateway Pavilion
CC Glenn Cutler
Linda,
Please schedule.
Thanks
Nathan
>>> Glenn Cutler 6/4/2009 2.58 PM >>>
Nathan,
Request final inspection for the Gateway Pavilion. The repair on the east wall under PB3 is almost complete. I desire to have the
ability to open the pavilion and east garage to the general public soonest.
I realize that only a temporary occupancy permit will be issued.
Thx. Glenn
,i
lw�
Northwestern Territories,Inc. JOB CONSTRUCTION
717 S. PEABODY
PORT ANGELES,WA 98362 REPORT
Engineers,Land Surveyors, Geologists DATE. 6/2/2009
(360) 452-8491 Fax(360)452-8498
Project: The Gateway Project Client: City of Port Angeles
Contractor- Pnmo Superintendent: Roland Ordona
Inspector Requested By- Jim Mallum Inspector• Shawn West
Weather- Clear Inspector Arrived. 9.00 AM
Inspector Departed. 10.05 AM
JOB # PRTA-0701
Remarks.
I arrived on site to observe placement and test concrete in the wall form placed over the
concrete wall in the parking garage.
Concrete truck and pumper were in place upon my arrival
Slump was recorded at 6 1/2"
Concrete mix was M4060SP, 4000 PSI-SUP, and Air
Admix included Polyheed(water reducer), and FC 3000 (water reducer)
4 cylinders were cast and left on-site for initial cure Break schedule will be 3, 7, 28, and
28 days.
Nothing Follows.
• NTI MATERIAL TESTING LABORATORY COMPRESSIVE STRENGTH TEST
717 S Peabody Port Angeles WA 98362 Specimen Transmittal &Test Results Form
360-452-8491 Fax: 360-452-8498
1 Material Type Concrete ❑ Mortar ❑ Grout
Client: City of PA
2 Number of Specimens 4
Project: Gateway
3 Testing Sequence Requested (days after casting)
BILLING INFORMATION ❑Standard A ❑ Standard B l] Standard C ■ Other(Specify)
7,28,28, Hold 7,28,28 28,28 3 7,28,28
❑ Lab Account#
4 Date Cast: 6/2/2009 5 Cast By* SRW
IN Project Account ID PRTA-0701
Project Manager Jim Mahlum 6 Material Supplied by- Fred Hill Materials
Email- 9mahlum(a)_cityofpa.us 7 Contractor- Primo
Phone 360-417-4701
Fax: 360-417-4709 18 Date Rec'd in Lab 6/3/09 9 Rec'd by- SRW
MATERIAL SPECIFICATIONS
W/C RATIO SLUMP AIR ENTRAINMENT TEMPERATURE UNIT WEIGHT
DESIGN 035
ACTUAL 6 1/2' NT 62 deg F NT
Required Compressive Strength
4000 @ 28 days
See attached or info for blank fields int is
COMPONENTS/MISCELLANEOUS section
Concrete Mix: M4060SP No. of Sacks/CY Load Size 3 c.y
Aggregate- Cement Admix Water
C200- 4240 lbs C250- 1680 lbs A340- 134 oz B285
C210- N/A C260- N/A A345 45 oz
C220- 5600 lbs A350- 5 oz W/C Ratio 035
Location of Placement: Wall Form in lower garage
Ticket ID, 13830 Ticket#- 17649 Customer#• 2103 Truck#• 73 Driver- Ruby Matt
Weather- Clear Temperature 54 deg F
Specimen Control# 1336 TEST RESULTS (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test @ Date Tested Break Total Unit Load
# Type Days Tested By Cap Type Load Area PSI
A 4x8 3 6/5/2009 SRW N 4 32140 1256 2559
B 48 7 6/9/2009 SRW N 5 42050 12.56 3348
C 48 28 6/30/2009 1256 0
D 48 28 6/30/2009 12.56 0
Comments about breaks:
ilk
AAsd dlaMATEMALS, WC 13830
POULSBO-(360)779-4431 PT TOWNSEND:(360)385-4100 SEQUIM:(360)683-7977
BAINBRIDGE.(206)842-6100 BREMERTON:(360)674-3131
OFFICE TOLL FREE:1-800-422-5010 www.fredhillmaterials.com
------------
WATER ADDED AT Concrete Tested El Yes 0 No LOT#
CUSTOMER'S REQUEST DELIVERY TiCKET
Cylinders Taken []Yes r_1 No
gals.to full load Remittance Address
gals.to%load Comments Fred Hill Materials, Inc.
Sig.of Rec.-Water Added Poulsbo,WA 98370
NOT RESPONSIBLE IRRITATION TO THE SKIN AND EYES ADDITIONAL WATER ADDED TO THIS MINUTES PER YARD
FOR VARIATION IN cement Polyme freshlyknit ad rote gr ut o morta may u ski CONCRETE WILL REDUCE ITS FREE UNLOADING TIME
njury.AV id ntact with s i nd wash xposed skin promptly with
COLOR OR SURFACE -ate if ny cement powde mixtu gets into eye ,,, immediately STRENGTH.ANY WATER ADDED IS AT ALLOWED Additional unload-
and ei�eatedly with wate and get prompt medical art Keep childr ing time charge at current
DISCOLORATION way rorn all tr shly mi ad ement products SEE BACK CUSTOMER'S OWN RISK. hourly truck rate.
LOAD +O-JOB ON'JO6" BEGIN 006R FINISH POUR +O'PLANT -IN YARD
ISH
'PL7ANT ORbERr* TICKET# MX, U
SL.MP USE
USE DATE
0E J 1j 3
CUSTOMER# CUSTOMER NAME ORDERED BY 'TAX P.O.' PROJECT#,
IN
JOB ADDRESS 9
TRUCK, bR�. IVE,A SPACING
INSTRUCTIONS
TIME DUE
SIGNATURE OF RECEIPT-CONCRIETE AND ACKNOWLEDGEMENT OF HAZARD WARNING
FRED HILL MATERIALS,INC.will not assume liability for any property da
ma a or SUB TOTAL
any equipment damage for any deliveries beyond the curb line. TAX
AUTHORIZED BY
SHIPMENT SUBJECT TO CONDITIONS ON REVERSE SIDE. TOTAL
Aggregate Target ArtAal Status 14a it Admiu Tavge� Actual 18tatus
Tare et
`Wm9 +26u _b 4e. 4lb In f 5 0 In T l
5�t.A(A Im Tnl 0 =A H�*�� 1 °� u^ 1� + 1m To/
A345 45 o 4+ In Toi
�
rare rero
-- - - - -- - - � a, � en
Cement rarget Actua IF)tat� s
- -- - - '- -�- Wate V T ot At_t`t'�4 �t -17,
Tar * e/ a
8r'�W ba/ J.T) r� |
�
/ P � -I n v^ W , *l 1 n�ed
1[M
09)Jim Mahlum RE PAIG Site Visit Report___ _ P___111
From <ab@brighteng com>
To Jim Mahlum <Jmahlum@cityofpa us>
Date 6/2/2009 9.49 AM
Subject: RE. PAIG Site Visit Report
Attachments. Masterflow 555 1.pdf- Masterflow 555 2.pdf
CC James Dugan <JDugan @parametrix.com> 'Stan Cruse' <SCruse@parametr
Stan
For some reason 550 keeps popping out. I Here is the spec for Matereflow 555 and not 550
Ade Bright, PE, SE
Bright Engineering Inc.
-Original Message-
From Jim Mahlum [mailto Jmahlum@cityofpa us]
Sent: Monday June 01 2009 5 36 PM
To ab@brighteng com
Cc: James Dugan Stan Cruse, 'Roland Ordona'
Subject: RE. PAIG Site Visit Report
Ade
Thank you for the response Port Angeles greatly appreciates it and now this loop is closed
Jim
>>> <ab@brighteng.com>6/1/2009 5 30 PM >>>
Stan
Yes it is Masterflow 555 and not 550 With regard to the facing wall concrete, it is ok to use 3/8' gravel
and increase slump to 7' or so with the use of superplastizers
Rolland called today stating that he ordered rebar based on drawings that did not show the DI pipe and
therefore the Horizontal inside face bar are hooked on one end only It is ok to use bars with one hook but
the hooked end are to be alternated
Ade Bright, PE, SE
Bright Engineering, Inc.
-Original Message-
From Stan Cruse [mailto SCruse@parametrix.com]
Sent: Monday June 01 2009 3 32 PM
To Bright Engineering
Cc: James Dugan
Subject: FW PAIG Site Visit Report
Ade
Can you help Jim with his last two items, slump and Masterflow I know you meant 555 but they have to be
exact.
Parametrix 40th Anniversary 1969-2009
inspired people inspired solutions making a difference
[6/9,'2009)Jim Mahlum RE. PAIG Site Visit Report
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752 9862
fax: 253 752 9865
cell 360 710 6425
scruse@parametrix.com
b Before printing please think green
-Original Message-
From James Dugan
Sent: Monday June 01 2009 3:20 PM
To Stan Cruse
Subject: FW PAIG Site Visit Report
Parametrix 40th Anniversary 1969-2009
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
2102 N Pearl Street, Suite#301 Tacoma, WA 98406
phone 253 752 9862
fax: 253 752 9865
cell 253.278.8105
jdugan@parametrix.com
P Before printing, please think green
-Original Message-
From Jim Mahlum [mailto.Jmahlum@cityofpa.us]
Sent: Saturday May 30 2009 9 40 AM
To James Dugan
Cc- Bright Engineering; Diane Lenius
Subject: Re PAIG Site Visit Report
Jim
Thank you for the report I do appreciate it. There are two points that were not addressed from my earlier
email the approval of the slump test and the clarification of the Masterflow I need this confirmation for
closing the loop on our documentation and these have not been verified nor are they in the specifications
or general notes The slump question was asked at the field visit so Ade should be able to confirm that
one easily The Masterflow question was asked in an earlier email by Roland and the response was use
Masterflow 550 which does not exist. Please verify that Ade meant Masterflow 555 which was asked for
approval and does exist.
I will expect the answer by 5 PM on Monday 6/1/2009
We are proceeding with the fix as the dowels have been inserted and patch has been applied
Thanks Jim
i(6%9F2009)Jim Mahlum RE mPAIG Site Visit Report µ.... Page 3`.
>>>Stan Cruse <SCruse@parametrix.com> 5/29/2009 9 59 PM >>>
Jim
See attached Ade's site obsevations This will address your email confirmation request.
Thank you Adel
Parametrix
inspired people* inspired solutions*making a difference Stanley C Cruse Corporate Architect
phone 360 850 5313
fax: 360 479 5961
scruse@parametrix.com<mailto:scruse@parametrix.com>
From Karen Fleming [kf@brighteng com]
Sent: Friday May 29 2009 4.05 PM
To Stan Cruse
Subject: PAIG Site Visit Report
Hi Stan * Please see the attached Site Visit Report of May 26 2009 prepared by Ade Bright on May 29
2009 Please contact me if you encounter any problems with the transmission of this document.
Best regards
Karen Fleming
Bright Engineering Inc
1809 7th Avenue)Suite 1100 1 Seattle, WA 98101
T 206 625.3777 1 F 206 625 1851 1 www brighteng com<http.//www.brighteng.com/>
BASF
The Chemical Company
PRODUCT DATA
MASTERFLOW" 555
Se.mi-fluid,nonshrink mineral-aggregate grout
Descirlptlon Features Benefits
Mast~555 grout is a semi-fluid, and,good worift time Excellent handling and placing characterttics
nonshrink mineral-aggregate grout.It Hardens free of bleeding,segregation, Ensures optimum performance in hardened state
Is ideally suited for grouting machines or settlement-shrinkage
or plates requiring optimum load- Pan be installed from'Sb 1:6 to Reduces dependence an w6aifie'r c6nd"'
bearing support.It meets ASTM C Mons
1107 and CRD C 621 Grades B and C, Contains no Inorganic accelerators, Will not corrode reinforcing steel
requirements at a semiziluid(30—40 Including chlorides or oftr salts
second How)consistency over a
temperature range of 50 to 85°F(10
to 29'C),and City of Los Angeles Where to Use 3. When dynamic,shear,or tensile forces are
Research Report Number RR 23137 APPLICATION anticipated,concrete surfaces should be chipped
with a'chisel-point'hammer,to a roughness of(plus
a Where ease of placement of a semi-fluld.groul or minus)3/8'(10 mm).Verify the absence
Yield with cost savings is desired of bruising following ICRI 03732 guidelines.
One 60 111(22.7 kg)bag of a Where high one-day and later-age compressive 4. Concrete surfaces should be rough and saturated
Masterfloe 555 grout mixed strengths are desired (pDrid"-with clean water for 24 hours just before
with approximately 8.3 lbs(3.8 kg)or * Where nonshrink grouting must achieve ample grouting.
1.0 gallon(3.8 Q of water yields bearing for optimum load transfer 5. All freestanding water must be removed from the
approximately 0.42 fit (0,012 m) Machinery and equipment---baseplates and foundation and boll holes Immediately before
of grout, soloplates grouting.
Water requirements may vary with Precast wall panels,beams,and columns & Anchor-bolt holes must be grouted and
mixing efficiency and other variables. - Curtain walls,concrete systems,and other sufficlently set before the major portion of the
Packaging structural and mtructural building members grout is placed.
50 lb(22.7 kg)multi-wall paper bags Anchor bolts,reinforcing bars,and dowel rods 7 Shade the foundation from summer sunlight
3,300 111(1,500 kg)bulk bags Grouting voids,rock pockets,and large cracks 24 hours before and 24 hours after grouting.
Shoff Lffe Formin,g
I year when property stored LOCATION 1 Forms should be liquid light and nonabsorbent.
Storage * Interior or exterior Seal forms with putty,sealant,caulk,polyurethane
Store In unopened bags in clean, loam.
dry conditions. How to Apply 2. Moderately sized equipment should utilize a head
Surface Preparation form sloped at 45 degrees to enhance the grout
1 Steel must be free of dirt,oil,grease,or other placement.A moveable head box may provide
contaminants. additional head at minimum cost.
2. The surface to be grouted must be clean, 3, Side and end forms should be a minimum 1
saturated surface-dry(SSD),strong.and roughened (25 mm)distant horizontally from the object grouted
to a CSP of 5—9 following ICRI Guideline 03732 to to permit expulsion of air and any remaining
permit proper bud.For freshly placed concrete, saturation water as the grout is placed.
consider using Liquid Surface Elchant(see product
data sheet No.1020198)to achieve the required
surface profile,
M81 MW"&REPM PRC$V MTA
MASM51 Nr'5w
2. The water demand will depend on mixing For Best Performance • Make certain the most current versions of
efficiency and material and ambient temperatures. Hold a pre job conference with your local product data sheet and MSDS are being used:
Use the minimum amount of water required to representative to plan the installation.Hid rail Customer Service(1-800-433-9517)to
Hold achieve the necessary placement consistency. verify the most current versions.
Recommended flow is 30—40 seconds or greater conferences as early as possible—before the
using the ASTM C 939 Flow-Cone Method.Before installation of equipment,sole plates,or rall Proper application is theresponsibiiity,of the user.
placing grout at ambient temperatures below 50°F mounts.Conferences are important for applying Meld visits by BASF personnel are for the purpose
(10°C)and above 85°F(29°G),consult your BASF the-recommendations In this product data sheet of malting technical recommendations only and not
representative. to a given project,and they help ensue a kir supervising or providing quality control on the
3. Moderate size batches of grout are-best mixed placement of highest quality and lowest cost. jobsite.
in one or more clean mortar mixers.Large batches Masterfiowl 555 is not Intended for.use as a
of grout are effectively,economically,and most floor topping or in large areas with exposed Health and Safety
efficiently mixed in ready-mix trucks using 3,300 lb shoulders around baseplates.Where grout is MASTERFLOW9 555
(1,500 kg)bulk bags. exposed for shoulders,occasional hairline cracks WARNINGI
may occur.Cracks may also occur near sharp
C Ma grout a minimum of 3 minutes after all comers of the baseplate and�at anchor bolts. MasteMow6 555 contains silica,crystalline quartz;
material and water are in mixer.Use mechanical These superficial cracks are usually caused by portland cement;calcium oxide;silica,amorphous.
mixer only. temperature and moisture changesT that affect the Risks
5. Do riot mix more grout than can be placed in grout at exposed shoulders at a faster rate than Product Is alkaline on contact with water and may
approximately 20 minutes or less,depending on the grout beneath the baseplate.They.do not
cause injury to skin or eyes. ingestion or inhalation
ambient,temperatures. affect the structural,nonshrin k,or vertical of dust may cause irritation. Contains small amount
6. Transport by wheelbarrow or buckets or pump support provided by-the grout if the foundation- of free respirable quartz which has been listed as a
to the equipment being grouted-Mfnlmize the preparation,placing,and curing procedures are suspected.human carcinogen by NTP and IARC.
transporting distance, properly carred out. Repeated or prolonged overexposure to free
7 Do not relemper grout by adding water. • Ambient and initial material temperature of C respirable quartz may..cause silicosis or other serious
8. For aggregate-extension guidelines,rotor to the grout should be in the range of 50to85°F and delayed-lung injury.
Appendix A-10:Guide to Cemenhtious.Grculing. (10 to 29°C)for both mixing and placing.Ideally, prec"ons
the amount of mixing water should be that
Applicationthe
to achieve a 30—40 second now Avoid contact with skin,eyes and clothing,Prevent
1 Place MasterfioxF 555 in a continuous inhalation of dust.Wash thoroughly after handling.
pour. according to ASTM C 939(CRI)C 611)or stiffer. Keep container dosed when not in use. DO NOT
Discard grout that becomes unworkable.Place grout For placement outside of 50 to 85°.F(10 to 29 take Internally. Use only with adequate ventilation.
from one side to avoid entrapment of air.Make sure Q.contact your local BASF representative. Use Impervious gloves,on eye protection and If the TLV
that the grout fills the entire space being grouted . Do not add plasticizers,accelerators,retarders,or
and remains in contact with the plate throughout the other additives unless advised in writingBASF is exceeded o used a poorly ventilated arca,use
grouting process.Straps may be used to move the � NIOStUtvtSHA approved respiratory protection In
Technical Service. accordance with applicable Federal,state and local
grout to ensure the entire space is filled.DD NOT , The water requirement may vary with mixing regulations.
2.
VIBRATE. efficiency,temperature,and other variables.
2. Immediately after placement,Irm the surfaces Furst Aid
with a trowel and cover the exposed grout with clean Minimum placement depth Is 1.5"(38 mm). In case of eye contact,flush thoroughly with water
wet rags.(not burlap).Maintain moisture for For pours greater than 6"(152 mm)deep, for at least 15 minutes. In case of skin contact,
5—6 hours. consult your focal BASF representative for special wash affected areas with soap and water. If irritation
3. The grout should offer stiff resistance to precautions and installation procedures. persists,SEEK MEDICAL ATTENTION. Remove and
penetration with a pointed mason's trowel before the • Use Masterfkwvt 816,Masteifiowa 1205,or wash contaminated clothing. if Inhalation causes
grout forms are removed or excessive grout is cut MasterflowR 1341 post-tensloning cable grouts physical discomfort,remove to fresh air. If
bac, when the grout will be in contact with steel discomfort persists or any breathing difficulty occurs
4. To further minimize the potential moisture loss
stressed over 80,000 psi(550 MPa). or it swallowed,SEEK IMMEDIATE MEDICAL
ATTENTIDN.
within the grout,cure all exposed grout with an • Use Masterno w'928 grout for precision
approved membrane curing compound(compliant applications requiring a fluid consistency
with ASTM C 309 or preferably ASTM C 1315) (25—30 second flow according to ASTM C 939
immediately after the wet rags are removed. or CRD-C 611)with extended working lime over
5. Consult your BASF representative before placing a temperature range of 45 to 85°F(7 to 29°Q.
lifts more than 6' (152 mm)in depth. Use F-robow`885 grout for precision applications
requiring a fluid consistency(25—30 second
flax according to ASTM C 93 or CRO C 611)with
extended working Ume over a temperature range
of 45 to 85°F(7 to 29°C)and dynamic bad-
hearing support.
NET PRO1EUG4 8 REPAIR R WJCT BAIA
MAsfevtaw'bee
Waste Disposal Method
This product when discarded or disposed of is not
listed as a hazardous waste in federal regulations.
Dispose of In a landrill in accordance with Wal
regulations.
For additional information on personal protective
equipment,first aid,arhi emergency procedures;
refer to the product Material Safety Data Sheet
(MSDS)on the job site or conlact the company
at the address or phone numbers given below.
Proposltion 65
This product contains material fisted by the State of
Califomla as known to cause cancer,birth defects or
other reproductive harm.
VOC Cotderd
0 g&or 0 ibstgal less water and exempt'sobents.
For medical emergencies only,
call Chernitec(1-800-424-9300).
r
)BASF Conehuclfoo Chemical%LLC— LIM Wart NUT12 Fx,• wv.evn m .4P—,BASF eQC r)A31'i"5 Wn da Pavatan 56F P'Oa Cts e'.61 CH P w a[m U-.» M emrg E! 7a l.Y r ry UN pr
1'�f
o•aWuivx[ti V.A. xtN <Pt- 40- nem p:vf�. -:..
7W, rdor"Cu.sxx'i-ar,s.,R aeoPre ,;a:M�tm awyr ema:ce. ,I a:a�xn many 4-sre
IBUUdIng a MA tl tts0 y, <a>xm l ,o tt aw MA:OS NO wMFnNir CP WAIWIiFF,WESS OR Wfto 10tdrlG'AARRAMBS'OF FWS5 MR R AFI: lUF AMGC tR
4(R;MAA'WF:UIY.FFSPEC''SIG I'"PH.'IO[TS Yd P.A4-A nm wr Mfre— —1—et' k�:yr -*g C ai, m- 1 re: Rp- —0 o- he MY d.
gl^e9*A:
1389 VaW Park Diff m sew�s+.au+au"I ra r z a4r a r a; am a UoEA :e 11 ka a w spa,m o v a� o f ps vo asRr r ao.wor ema x
k.� x •rc- :tt ,axc•:Hr .A c^„Y PA51 le[r,.ni At w'k.
lihakopee•MM,55379 mater xa ddFm eGetry asxoea mPw9ypFnut anamam+n woamx NasF rvm n a+r c'mwo:a rF.»,m.e,m vn 5 :* r m.a
YAR;9E' 'fdt0ffiiYYDfo datl rideP aSt1'a!f'Kh+. g itf¢SS$yO;,6r 6A4 4Un; CCAS F!IOwAIp wN.W:yDFS 1N'[iN(T.FXFFCSS;,�a`R.IED :1u TFF .SCNWAVB
i'44Y\Y.DUlldlf j$y51eRtS.t SF.COrTI oc FmtSv sUrap ,ta[tsi "e cA[u7+�wFE�aah Eu Slut[�F sasr[gt a,c raa[aa[a r:R:. ^.,¢: w�:la;.Tre ocucsFsrnr�mn LOR,0 R. IS)C ,YNNLR rmr�a�
rvryYrtm.aaa+Fougaaeorky;a:m:trrav+�av�emvamrr�mxre+xA.Fnhoaaa•�+aans�e'umyalm roar+...e;.c za vs rmn+aSnzk PofartrwdFa M:ala+dd Aaot ,zear.
ue.4lStm8ka;atazlymftafi3,'s�rrm,b e44Ai° 4mDaerk+�am+ iUEalRaq•ia U�+ata�.rl. xxnlEan• sten ra>i-.::.:.aV@arc c.�a,c�:Mc <mme.:l�s
t:ueMmef Service 800-433-9517 .m u�am�w„a ry amc[a<[�•u rp,nomas vrtsu�mx�ra,�n
fad:N. e§XC 7.+OT QT.CP fls.4
Technical Service 800-243.6739 ler prolonIMM use "for tale to or use by Um pmmal pubft m coxvw UP•IIabT oea Prete or uSA
a
mB1 PRaRCTIQN L REPAIR PRODUCT DATA
MASnWUW666
Technical Data
Composition Test Data
Masterflow6 555 grout is a semi-liufd,nenshrink toREr ry _ _ HESE Ts W_ ' 7UST
mineral aggregate grout Compresshe Strengft psi(MPa) d ASTM C 942.according
to ASTM C 1107
Consistency
Pllorw lztowasle` fluid'
1 day 4,200(29) 3,700(26) 3,000(21)
3 days 5,800(40) 4,500(31) 4,200(29)
7 days 7,300(50) 6,500(45) 6,000(41)
28 days 8,500(59) 7.500(52) 7.000(48)
Volume Change ASTM C 1090
%Change of `X Regcdremerd
maslernow•50 of ASTM C 1107
1 day >0 0.0-0.30
3 days 0.04 0.0—0.30
7 days 0.06 0.0-0.30
28 days 0.07 0.0-0.30
Sailing time,semi-fluid wrsisterx ASTM C 191
Anal set(lv:min) 6:00
'100—125%110W on flaw table ac=&V IoASTM C 230.
'125-145%lbw m lbw Latae acc &V b ASTM C 230.
130—40 socmtds through DOW ame acmnratg to ASTM C 939
The above data vm devd/ped uider controlled labor"Condition.Properties in dre tido may vary.Expect reawrTable vadatiam ham
ttBse results,deperi ft on Jobs to or tat anion m.
Jobstte Ting
If strength tests must be made at the*site,Use 2'(51 mm)metal cube molds as specified by ASTM C 942 or
ASTM C 1107 DO NOT use cykWer molds or plastic cube molds.Control testing an the bass of the desired placing
Consistency ranter Ron strictly on the water coNent.
4. Extend forms a minimum of 1 (25 mm)higher Temperature 3. When grouting al minimum temperatures,
than the bottom of the equipment being grouted. 1 For rmashrink grouting,store and mix grout to be certain that foundation,plate,and grout
5. Leave a minimum of 2' (51 mm)between the produce the desired mixed grout temperature based temperatures do not fall below 50°F(10°C)until
bearing plate and the form to allow for ease of upon ambient temperatures and tem a conditions. after final set Protect the grout from freezing
placement (32°F or 0°C)until it has attained a compressive
ti. A minimum of 1 (25 mm)clearance is required Recommended Temperature Guidelines strength of 3,000 psi(20.7 MPa)in accordance with
for Nonshrink Smuting ASTM C 942 or ASTM C 1107
Mere the rout will be ed. _ , =r- , . �� 'r,
9 (..;. r� i Miring
7 Use sufficient bracing to prevent the grout from r .t p, 'I
{; '
leaking or the farms from moving. 1 Master(W 555 grout should be mixed with a
8. Eliminate lar nonsu rout areas Foueodaton and plates 50 p0) 85(29) mechanical mixer for at least 3 minutes.For a semi-
wherever possible. Mixing water 50(i0) &5(29)�' g fluid consistency,start with 8.3 lb(3.8 kg)or 1.0
gallon(3.8 L)per 50 Ib(22.7 kg)bag.(Use potable
9. Expansion joints may be necessary for both Graft at mixed and 5o(t0) 85(29) water onty.)Adjust mixing water,as needed,to
indoor and outdoor Installation.Consult your local placed temperature establish a semi-fluid conslstemcy(30—40 seconds)
BASF field representative for suggestions through a flow cone according to ASTM C 939/CRD
and recommendations. C 611 Less mixing water will be
2. 11 temperature extremes are anticipated or if )• 9 required to achieve
special placement procedures are planned,contact sfifter consistencies.Slowly add the dry grout to
your local BASF representative for assistance. mixing water.
,f�6/9/2009)Jim Mahlum RE. PAIG Site VisitwF2eport
From <ab@brighteng com>
To Jim Mahlum <Jmahlum@cityofpa us>
Date 6/2/2009 8 58 AM
Subject: RE. PAIG Site Visit Report
Attachments. Masterflow 550 1.pdf- Masterflow 550 2 pdf
cc James Dugan <JDugan@parametrix.com> 'Stan Cruse <SCruse@parametr
Jim
FYI Here is the spec for Matereflow 550
Ade Bright, PE SE
Bright Engineering Inc.
-Original Message-
From Jim Mahlum [mailto.Jmahlum@cityofpa us]
Sent: Monday June 01 2009 5 36 PM
To ab@brighteng.com
Cc James Dugan Stan Cruse, 'Roland Ordona'
Subject: RE PAIG Site Visit Report
Ade,
Thank you for the response Port Angeles greatly appreciates it and now this loop is closed
Jim
>>> <ab@brighteng com> 6/1/2009 5.30 PM >>>
Stan,
Yes, it is Masterflow 555 and not 550 With regard to the facing wall concrete, it is ok to use 3/8' gravel
and increase slump to 7' or so with the use of superplastizers
Rolland called today stating that he ordered rebar based on drawings that did not show the DI pipe and
therefore the Horizontal inside face bar are hooked on one end only It is ok to use bars with one hook but
the hooked end are to be alternated
Ade Bright, PE, SE
Bright Engineering, Inc.
-Original Message-
From Stan Cruse [mailto SCruse@parametrix.com]
Sent: Monday June 01 2009 3.32 PM
To Bright Engineering
Cc: James Dugan
Subject: FW PAIG Site Visit Report
Ade
Can you help Jim with his last two items slump and Masterflow I know you meant 555 but they have to be
exact.
Parametrix 40th Anniversary 1969-2009
inspired people inspired solutions making a difference
(6/9%2009)Jim Mahlum RE. PAIL Site Visif Report - - - R -� Page 2�
Stanley C Cruse,AIA, LEED v.2 AP
Project Manager
phone 253 752 9862
fax: 253 752 9865
cell 360 710 6425
scruse@parametrix.com
p Before printing, please think green
-Original Message-
From James Dugan
Sent: Monday June 01 2009 3:20 PM
To Stan Cruse
Subject: FW PAIG Site Visit Report
Parametrix 40th Anniversary 1969-2009
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
2102 N Pearl Street, Suite#301 Tacoma, WA 98406
phone 253 752.9862
fax: 253 752 9865
cell 253.278 8105
jdugan@parametrix.com
b Before printing, please think green
-Original Message-
From Jim Mahlum [mailto.Jmahlum@cityofpa.us]
Sent: Saturday May 30 2009 9.40 AM
To James Dugan
Cc Bright Engineering; Diane Lenius
Subject: Re PAIG Site Visit Report
Jim
Thank you for the report I do appreciate it. There are two points that were not addressed from my earlier
email the approval of the slump test and the clarification of the Masterflow I need this confirmation for
closing the loop on our documentation and these have not been verified nor are they in the specifications
or general notes The slump question was asked at the field visit so Ade should be able to confirm that
one easily The Masterflow question was asked in an earlier email by Roland and the response was use
Masterflow 550 which does not exist. Please verify that Ade meant Masterflow 555 which was asked for
approval and does exist.
I will expect the answer by 5 PM on Monday 6/1/2009
We are proceeding with the fix as the dowels have been inserted and patch has been applied
Thanks Jim
(6/9T2009)Jim Mahlum RE PAIG Site Visit Reporf M µ m Page 3
>>> Stan Cruse <SCruse@parametrix.com> 5/29/2009 9 59 PM >>>
Jim
See attached Ade's site obsevations This will address your email confirmation request.
Thank you Ade !
Parametrix
inspired people" inspired solutions * making a difference Stanley C Cruse Corporate Architect
phone 360 850 5313
fax: 360 479 5961
scruse@parametrix.com<mailto.scruse@pa ram etrix.com>
From Karen Fleming [kf@brighteng com]
Sent: Friday May 29 2009 4.05 PM
To Stan Cruse
Subject: PAIG Site Visit Report
Hi Stan * Please see the attached Site Visit Report of May 26 2009 prepared by Ade Bright on May 29
2009 Please contact me if you encounter any problems with the transmission of this document.
Best regards,
Karen Fleming
Bright Engineering, Inc.
1809 7th Avenue) Suite 1100 1 Seattle, WA 98101
T 206 625.3777 1 F 206 625 1851 1 www brighteng.com<http.//www.brighteng com/>
El i BASF
The Chemical Company
PRODUCT DATA
;� MASTERFLOW® 555
;1", 4 f
4 Semi-fluid,nonshrink mineral-aggregate grout
Descdptlon features Benefits
MastenW 555 grout is a semi-fluid, `Semi=flirld;consistency'andgoad:worklrug,flme Excell-hl,11aridlirig antl°piaci ig,Cha>acter IiCs
nonshdnk mineral-aggregate grout.It Hardens free of bfeeding,segregation, Ensures optimum performance in hardened state
is Ideally suited for grouting machines or settlement shrinkage
or plates requiring optimum load- .....,., ____
bearing support.It meets ASTM C L Can°tie insfa(l� edmfroni 5bltrs 85�F(10.fdi a&° vfz.� ` Educes deperid_ence on.vieather"condt ons
1107 and CRD C 821 Grades B and C, • COntairrs no inorganic accelerators, Will not corrode reinforcing steel
requirements at a semi-fluid(30—40 Including chlorides or other salts
second flow)consistency over a
temperature range of 50 to 85°F(10
to 29°C),and City of LosAngeles Where to Use 3. When dynamic,shear,or tensile forces are
Research Report Number RR 23137 APPLICATION anticipated,concrete surfaces should be chipped
• Where ease of with a'chisel-point"hammer,to a roughness of(plus
placement of a semi-fluid grout or minus)3/8"(10 mm).Ve*the absence
Yleld with cost savings is desired of bruising following ICRI 03732 guidelines.
One 50 Ib(22.7 kg)bag of • Where high one-day and later-age compressive 4, Concrete surfaces should be rough and saturated
Masterflows 555 grout mixed strengths are desired prided)with clean water for 24 hours Just before
with approximately 8.3 lbs(3.8 kg)or a Where nonstuink grouting must achieve ample grouting.
1.0 gallon(3.8 Q of water yields bearing for optimum load transfer
approximately 0.42 ft'(0.012 m� 5. All freestanding water must be removed from the
of grout. • Machinery and equipment--baseplates and foundation and bolt holes immediately before
soleplates grouting.
Water requirements may vary with precast wall panels,beams,and columns 6. Anchor-bolt holes must be grouted and
mixing efficiency and other variables. suffrclen set before the major on of the
Packaging Curtain wells,concrete systems,and ocher tl1' 1 pm'b
structural and nonstructural building members grout is placed.
50 ib(22.7 kg)multi-wall paper bags Anchor bolts,reinforcing bars,and dowel rads 7 Shade the foundation from summer sunlight
3,300 Ib(1,500 kg)bulk bags Grouting voids,rock pockets,and large cracks 24 hours before and 24 hours after grouting.
Shelf Life Farming
1 year when property stored LOCATION 1 Forms should be liquid Light and nonabsorbent,
Storage • Interior o exterior Seal forms with putty,sealant,caulk,polyurethane
Store in unopened Bags in clean,
foam.
dry conditions. How to Apply 2. Moderately sized equipment should utilize a head
Surface Preparation form sloped at 45 degrees to enhance the grout
1 Steel must be free of dirt,oil,grease,or other placemenL A moveable head box may provide
contaminants.
additional head at minlmum cost.
2. The surface to be grouted must be dean, 3, Side and end forms should be a minimum 1
saturated surface-dry(SSD),strong,and roughened (25 mm)distant horizontally from the object grouted
to a CSP of 5—9 following ICRP Guideline 03732 to
to permit expulsion of air and any remaining
permit proper bond.For freshly placed concrete, saturation water as the grout is placed.
consider using Liquid Surface Elchant(see product
data sheet No.1020198)to achieve the required
surface profile.
WT PROTECTOR b REPAIR I MIx1CT DATA
YABTEM W'r0
2. The water demand will depend an muting For gest Performance Make certain the most current versrons of
efficiency and material and ambient temperatures. Hold a pre-job conference with your local product data sheet and MSDS are being used;
Use the minimum amount of water required to representative to plan the installation.Hold call Customer Service(1-800-433-9517)to
achieve the necessary placement consistency. verify the most current versions.
co
Recommer*d flow is 30—40 sends or greater conferences as early as possible—before the
installationof equipment,sole plates,or ran Proper application is the responsibility of the user.
using the ASTM C 939 Flow-Cone Method.Before
placing grout at ambient temperatures below 50°F mounts.Conferences are important for applying Field visits by BASF personnel are for the purpose
(10°C}aril above ambient
F(29°C),consult your BASF the recommendations in this product data sheet of making technical recommendations only and not
representative to a given project,and they help ensure a for supervising or providing quality control on the
3. Moderate size batches of grout are best mixed placement of highest quality and lowest cost. jobsete.
in one or more clean mortar mixers.Large batches Masterfia06 555 is not Intended for use as a
of grout are effectively,economically,and most floor topping or In large areas with exposed Health and Safety
efficiently mixed in ready-mix trucks using 3,300 lb shoulders around baseplates.Where grout is MASTERFLOW6 555
(1,500 kg)bulk bags. exposed for shoulders,occasional hairline cracks WARNINGI
may occur Cracks may also occur near.sharp
4. Mix grout a minimum of 3 minutes after all comers of the baseplate and at anchor bolls. Mastertlovva 555 contains silica,crystalline quartz;
material and water are in mixer.Use mechanical These superficial cracks are usually caused by portland cement;calcium oxide;silica,amorphous.
mixer only. temperature and moisture changes that affect the Risks
5. Do not mix more grout than can be placed in grout at exposed shoulders at a faster rate than Product Is alkaline on contact with water and may
approximately 20 minutes or less,depending on the grout beneath the baseplate.They do not cause injury to skin or eyes. Ingestion or inhalation
ambient temperatures, affect the structural,nonshrink,or vertical of dust may cause irritation. Contains small amount
6. Transport by wheelbarrow or buckets or pump support provided by the grout if the foundation- of free respirable quartz which has been listed as a
to the equipment being grouted.Minimize the preparation,placing,and curing procedures are sued human carcinogen by NTP and IARC.
transporting distance. property carried out. Repeated or prolonged overexposure to free
7 Do not reiemper grout by:adding water. • Ambient and initial material temperature of respirable quartz may cause silicosis or other serious
8. For aggregate-extenslon guidelines,reler to the grout should be in the range of 50 to 85°F and delayed lung Injury.
Appendix A-10:Guide to Cementitious Grouting. (10 to 29°C)for both mixing and placing.Ideally, precautions
the amount of mixing water should be that
Applicationthe
to achieve a 30—40 second lives Avoid contact with skin,eyes and clothing.Prevent
1 Place Masterilowe 555 in a continuous Inhalation of dust.Wash thoroughly after handling.
pour. according to ASTM C 939(Cid C 611)or stiffer. Keep.conlainer dosed when not In use. DO NOT
Discard grout that becomes unworkable.Place grout For placement outside of 50 to 85°F(10 to 29 take Internally. Use only with adequate ventilation.
from one side to avoid entrapment of air.Make sure C),contact your local BASF representative. Use impervious gloves,eye protection and If the TLV
that the grout rills the entire space being grouted . Do not add plasticizers,accelerators,retarders,or is exceeded or used in a poorly ventilated area,use
and remains in contact with the plate throughout the other additives unless advised in writing by BASF MDSWMSHA approved respiratory protection In
grouting process.Straps may be used to move the Technical Service.
grout to ensure the entire space is filled.DO NOT accordance with applicable Federal,slate and local
VIBRATE.to • The water requirement may vary with mixing regulations.
efficiency,temperature,and other variables. First Aid
2. Immediately after placement,Irim the surfaces Minimum placementth Is 1.5" 8 mm).
with a trowel and cover the exposed grout with clean ) !n case of eye Contact,flush thoroughly with wafer
wet rags(not burlap).Maintain moisture for • For pours greater than 6"(152 mm)deep, for at least 15 minutes, In case of An contact,
5—6 tours. consult your local BASF representative for special wash affected areas with soap and water. If irritation
3. The grout should offer stiff resistance to precautions and installation procedures. persists,SEEK MEDICAL ATTENTION. Remove and
penetration with a pointed mason's trowel before the • Use Masterflow•816,Masterflow$1205,or wash contaminated clothing. If Inhalation causes
grout fomes are removed or excessive grout is cut Masterflow4 1341 post-tensioning cable grouts physical discomfort,remove to fresh air. If
back when the grout will be in contact with steel discomfort persists or any breathing difficulty occurs
stressed over 80,000 psi(550 MPa). or if swallowed,SEEK IMMEDIATE MEDICAL
4 To further minimize the potential moisture loss ATTENTION.
within the grout,cure all exposed grout with an Use Masterflow•928 grout for precision
approved membrane curing compound(compliant applications requiring a fluid consistency
with ASTM C 309 or preferably ASTM C 1315) (25—30 second flow acoordlrg to ASTM C 939
Immediately after the wet rags are removed. or CRD C 611)with extended wanting time over
5. Consult your BASF representative beloe placing a temperature range of 45 to 85°F(7 to 29°Q.
lifts more than 6"(152 mm)In depth. • Use Embec•.o`885 grout for precision applications
requiring a fluid consistency(25—30 second
flow according to ASTM C 93 or CRD C 611)with
extended working time over a temperature range
of 45 to 85°F(7 to 29°C)and dynamic load-
bearing support.
WT PROTEM 8 WAIR RtOaIrCT BMA
N48r9WL W'EM
Waste Disposal Method
This product when discarded or disposed of is not
listed as a hazardous waste in federal regulations.
Dispose of In a landfill in accordance with local
regulations.
For additional Information on personal protective
equipment,first aid,and emergency procedures,
refer to the product Material Safety Data Sheet
(MSDS)on the job site or contact the company
at the address or phone numbers gtven below.
PropoeMon 65
This product contains material listed by the State of
California as known to cause cancer,birth defects or
other reproductive harm.
VOC Content
0 g/t.or 0 lbs/gal less water and exempt solvents.
For medical emergencies only,
call ChemTfrec(I-OW424-9300).
I
BASF Construction Chemicals,LLC— LWM w,Elwalt MM I>*y W u,scyr EASE w^tea w, n IM=.e w yA,,-.a,asp
r-aW.n m,a A. ,«-tpty !V- 'M m•. -mi os+d a'ece. Saxt>vy ra xcesa,a e^keoa-a.am olaaca.a su�xn ra-r ecru.
BUIlding Systemsa om a••ra.a c au .10-11 1014 alis Auas Ma w1r VNit art auwuu,I o cress oa ptrEHl rcxun,k uawams or mass wn A PAR1Zu Ar fi.rrG:t W
VIHOMNIAb,M P!SRUNG i''5VR'U T&antbg-k'10143W
m- 4MN 1.c- 4�6Q IYP t+�l:u, ra g.o4,t 0:1Y.-'WIfa 1_Lrv^a.y a�`
o'4.t1Y +emu 4YenlS.-M I.:C6T'
889 Valley Park Drive .60.
m 4"Oed area a.,.on..m er tic rr;'t .Eoaa c,:m 4 ��tr u at. e e oe.�a»rens d ur ra m e a R.s a J timeetr n x ar w we a
W,SG lrav etit.i:lar 'n.. ,-'nSix m 4M7 h rA51 I-yrr W 51 NT
Shakopee.MN,55379 �,.+m,mar.uame.mamas,t�meAVYaaaca q«wmvr+s+u..ee�.urv�roty,a: 1,s w y.roar.ao5 .r ro n�.,I
eupl%MO AnET9ra9QtTr�lOA kPO/etL-AM
filo NDT M••'Pain-.er 6t4QrQar-seeatm VETCAhIN)IT41 MUGIF EJSfi[SS^�9JA�lo d.7 uo'kentSlc:tCreaa�rlFS
www.BLiWi ems.BASFcom Off �f(pAP tARRi lm1 SMS+ 71Y1�9WItWt�AE4tDF#SEFQ4CLKJ6EKW.ltOq(GiGFAVYH7dIWItCISt ou ,c�nMn saav vuuasnp-w.
� M•t�+yn•+ra/RrasRarmOV Ctaat'+#LVWmakrc�eantYnamenm�Cftrs✓xn 4arcµ+e roae,n rc�.c rn.t. trcr+roSaae rhibsanata�ctubSQot»MM
Customer Service BOD-433.9517 ® ;"a" ;;° ., , y� wt�aatleassb.wd�rawwxr.manu.,.t a unite. eau.urlonnr,vum< ,a1�eRnc- .m cram
+a emam aaasamsr�WaM
Teehnlealservice,80D-243-6739rne,E1: Iwoc r�' 1;x ,,,r2, v�r•�sAA
�- far prai�Ier uae o>drt>tW tw rale to or un by the Omrersl poise. ^�R r.�MW'44r. 1 M
Mal PROTECTION 6 REPAIR PRDDUCT DATA
uAcnwuW am
Technical Data
Composition Test Data
Masterflow6 555 grout Is a semi-fluid,nonshrink _ EITrX ,,, __ _• RE1lTs �_ _
mineral-aggregate grout. CompreasNe b1m+i (MPa) — ASTM C 942.according
to ASTM C 1107
Conslsiency
Pltmtla' Rowebls' Hull'
1 day 4,200(29) 3,700(26) 3,000(21)
3 days 5,80D(40) 4,500(31) 4,200(29)
7 days 7,30D(50) 6,500(45) 6.000(41)
28 days 8,500(59) 7,500(52) 7,000(48)
Volume change ASTM C 1090
%Mange of %Requirement
Maafer@ow'555 of ASTM C 11Qr
1 day >0 0.0—0,30
3 days 0.04 0.0-0.30
7 days 0.06 0,0-0.30
28 days 0.07 0.0-0.30
Setting time,semi-fluid consWenW ASTM C 191
Fnai set(hr:mlo 6:00
t oo—125%110W On flow W*amorclittg to ASTM C 230.
1125—145%,flow on UY table amordmg 10 ASTM C 230.
'30—40 sowtds through flow cow a=2V b ASTM C 939
The strove data was developed ur da omlroaed laboratory Conalo a.Properties In ft Bid may vary.Evect reasonable va iatiws ham
these results,depmQV M mite or test aWlions.
Jobsfte Testlng
ff strength tests must be made at the jaesite,use 2'(51 mart)metal cube molls as specified by ASTM C 942 or
ASTM C 1107 DO NOT use cylinder molds or plastic cube molds.Control testing on the bass of the desired placing
consistency rather than strictly on the water content.
4. Extend forms a minimum of 1 (25 mm)higher Temperabaire 3. When growling M minimum temperatures,
than the bottom of the equipment Ging grouted. 1 For nanshrink grouting,store and mix grout to be certain that foundation,plate,and grout
S. Leave a minimum of 2' (51 mm)between the produce the desired mixed-grout temperature based temperatures do not fall below 50°F(10°C)unlit
bearing plate and the form to allow for ease of upon ambient temperatures and jobsile conditions. after final set.Protect the grout from hazing,
placement (32°F or 0°C)until it has atWnl:d a compressive
6. A minimum of 1 (25 mm)clearance is required Recommended Temperature Guidelines strength of 3,000 psi(20.7 Wal in accordance with
for Nonshrink GMAng ASTM C 942 or ASTM C 1107
where the grout will be placed. fm)Ik1 �" l n p(i3dng
7 Use sufficient bracing to prevent the grout from � �
' + 1 MasterfkW 555
leaking or the farms from moving. grout should be mixed with a
B. Biminate large,nonsupported grout areas Faundation and plates 50 p0) 959% mechanical mixer for at least 3 minutes.For a semi-
fluid consistency,start with 8.3 lb(3.8 kg)or 1.0
semi-
wherever possible. Mixing water 30(1Q) Com) gallon(3.8 L)per 50 Ib(22.7 kg)bag.(Use potable
9. Expansion joints may be necessary for both grout at mixed and 50(10) 85(29) water only.)Adjust mixing water,as needed,to
indoor and outdoor installation.Consult your local paced temperature establish a semi-fluid consistency(30—40 seconds)
BASF field representative for suggestions through a flow cone according to ASTM C 9391 CRD
and recommendations. 2. If temperature extremes are anticipated or it C 611).Less mixing water will be required to achieve
special placement procedures are planned,contact stiffer consistencies.Slowly add the dry grout to
your local BASF representative for assistance. mixing water.
NTI MATERIAL TESTING LABORATORY COMPRESSIVE STRENGTH TEST
717 S Peabody Port Angeles WA 98362 Specimen Transmittal&Test Results Form
360-452-8491 Fax: 360-452-8498
1 Material Type Concrete ❑ Mortar ❑ Grout
Client: City of PA
2. Number of Specimens. 4
Project: Gateway
3 Testing Sequence Requested (days after casting)
BILLING INFORMATION []Standard A ❑ Standard B ❑ Standard C ■Other(Specify)
7,28,28,Hold 7,28,28 28,28 3 7,28,28
❑ Lab Account#
4 Date Cast: 6/2/2009 5 Cast By- SRW
IN Project Account ID PRTA-0701
Project Manager Jim Mahlum 6 Material Supplied by* Fred Hill Materials
Email: jmahlum(d)cityofpa.us 7 Contractor- Primo
Phone 360-417-4701
Fax: 360-417-4709 18 Date Rec'd in Lab 6/3/09 9 Rec'd by- SRW
MATERIAL SPECIFICATIONS
W/C RATIO SLUMP AIR ENTRAINMENT TEMPERATURE UNIT WEIGHT
DESIGN 035
ACTUAL 6 1/2' NT 62 deg F NT
Required Compressive Strength
4000 @ 28 days
See attached or info for blank fields in this
COMPONENTS/MISCELLANEOUS section
Concrete Mix: M4060SP No. of Sacks/CY Load Size 3 c.y
Aggregate- Cement Admix Water
C200- 4240 lbs C250- 1680 lbs A340, 134 oz 8285
C210- N/A C260- N/A A345 45 oz
C220- 5600 lbs A350- 5 oz W/C Ratio 035
Location of Placement: Wall Form in lower garage
Ticket ID- 13830 Ticket#- 17649 Customer#- 2103 Truck#• 73 Driver- Ruby Matt
Weather- Clear Temperature 54 deg F
Specimen Control# 1336 TEST RESULTS(TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test @ Date Tested Break Total Unit Load
# Type Days Tested By Cap Type Load Area PSI
A 4x8 3 6/5/2009 SRW N 4 32140 12.56 2559
B 4x8 7 6/9/2009 SRW N 5 42050 12.56 3348
C 4x8 28 6/30/2009 SRW N 3 51240 12.56 4080
D 4x8 28 6/30/2009 SRW N 3 53940 12.56 4295
Comments about breaks.
(6�9/2�009)Jim Mahlum RE PAIL Site Visit-Report Page 1
From <ab@brighteng com>
To 'Stan Cruse <SCruse@parametrix.com>
Date 6/1/2009 5 31 PM
Subject: RE. PAIG Site Visit Report
CC James Dugan <JDugan@parametrix.com> Jim Mahlum <jmahlum@cityofp
Stan
Yes it is Masterflow 555 and not 550 With regard to the facing wall concrete it is ok to use 3/8' gravel
and increase slump to 7' or so with the use of superplastizers
Rolland called today stating that he ordered rebar based on drawings that did not show the DI pipe and
therefore the Horizontal inside face bar are hooked on one end only It is ok to use bars with one hook but
the hooked end are to be alternated
Ade Bright, PE, SE
Bright Engineering, Inc
-Original Message-
From Stan Cruse [mailto SCruse@parametrix.com]
Sent: Monday June 01 2009 3 32 PM
To Bright Engineering
Cc: James Dugan
Subject: FW PAIG Site Visit Report
Ade,
Can you help Jim with his last two items, slump and Masterflow I know you meant 555 but they have to be
exact.
Parametrix 40th Anniversary 1969-2009
inspired people inspired solutions making a difference
Stanley C Cruse, AIA, LEED v2 AP
Project Manager
phone. 253 752.9862
fax: 253 752.9865
cell 360 710 6425
scruse@parametrix.com
0 Before printing, please think green
-Original Message-
From James Dugan
Sent: Monday June 01 2009 3:20 PM
To Stan Cruse
Subject: FW PAIG Site Visit Report
Parametrix 40th Anniversary 1969-2009
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
`(6%9% 009)Jim MahlumRE PAIL Site VisitxReport µ ' µ� y Page 2
2102 N Pearl Street, Suite#301 Tacoma WA 98406
phone 253 752 9862
fax: 253 752 9865
cell 253.278 8105
jdugan@parametrix.com
p Before printing, please think green
-Original Message-
From Jim Mahlum [mailto.Jmahlum@cityofpa.us]
Sent: Saturday May 30 2009 9 40 AM
To James Dugan
Cc: Bright Engineering Diane Lenius
Subject: Re PAIG Site Visit Report
Jim
Thank you for the report I do appreciate it. There are two points that were not addressed from my earlier
email the approval of the slump test and the clarification of the Masterflow I need this confirmation for
closing the loop on our documentation and these have not been verified nor are they in the specifications
or general notes The slump question was asked at the field visit so Ade should be able to confirm that
one easily The Masterflow question was asked in an earlier email by Roland and the response was use
Masterflow 550 which does not exist. Please verify that Ade meant Masterflow 555 which was asked for
approval and does exist.
I will expect the answer by 5 PM on Monday 6/1/2009
We are proceeding with the fix as the dowels have been inserted and patch has been applied
Thanks Jim
>>> Stan Cruse <SCruse@parametrix.com> 5/29/2009 9.59 PM >>>
Jim
See attached Ade's site obsevations This will address your email confirmation request.
Thank you Adel
Parametrix
inspired people* inspired solutions* making a difference Stanley C Cruse Corporate Architect
phone 360.850.5313
fax: 360 479 5961
scruse@parametrix.com<mailto:scruse@parametrix.com>
From Karen Fleming [kf@brighteng.com]
Sent: Friday May 29 2009 4.05 PM
To Stan Cruse
Subject: PAIG Site Visit Report
Hi Stan * Please see the attached Site Visit Report of May 26, 2009 prepared by Ade Bright on May 29
2009 Please contact me if you encounter any problems with the transmission of this document.
Best regards,
Karen Fleming
Bright Engineering Inc.
IC(-6/9/2009)Jim Mahlum RE. PAIG Site Visit Report - Page 3
1809 7th Avenue) Suite 1100 1 Seattle WA 98101
T 206 625 3777 1 F 206 625 1851 1 www.brighteng com<http://www brighteng com/>
Northwestern Territories,Inc. JOB CONSTRUCTION
717 S. PEABODY
PORT ANGELES,WA 98362 REPORT
Engineers,Land Surveyors, Geologists DATE. 6/1/2009
(360) 452-8491 Fax(360)452-8498
Project: The Gateway Project Client: City of Port Angeles
Contractor- Primo Superintendent: Roland Ordona
Inspector Requested By- Jim Mallum Inspector- Shawn West
Weather- Clear Inspector Arrived. 10 00 AM
Inspector Departed. 2.20 PM
JOB # PRTA-0701
Remarks
I arrived on site to observe rebar placement for the lower level parking garage wall frame
to cover the failing portion of the Gateway Project. The crew on site (Roy and Roland)
had the plan set dated 5/13/09 and was placing and tying the rebar in accordance to this
plan set except for the area calling for#6@12 IF which were not present. Roland
informed me that when he received the plan set dated 3/8/09 that he was given the go
ahead to order rebar for this fob On Thursday 5/28/09 while inspecting the holes drilled
for anchors I noticed that he did not have a current plan set and gave him one at that time.
No rebar was on site to use for the IF of the wall. A phoned Jim Mallum, and Ade Bright
and informed them of the situation. Jim Mallum arrived on site and spoke to Roland.
Ade phoned Roland and it was determined at that time that the rebar for the horizontals
would be tied according to the 3/8/09 plan set with regards to this area. Upon further
review of the plans it appeared this was the only significant change to the drawing. A
follow-up email would be sent from Ade Bright confirming the change.
All vertical, horizontal and dowels were confirmed to be placed and tied according to
plan set.
1 ''/2" cover was confirmed from rebar to interior wall.
2"cover was confirmed from rebar to exterior wall.
WWF 4x4—w4xw4 mesh pad was placed behind piping running vertically up wall.
JVI Masticord Bearing Pad was glued and placed per plan set.
Expansion felt was placed per plan set.
Nothing Follows.
1 I �.>�. � ��I ��� � Y'�• {�.eta ��
-
r 10 THa
1h JJ( ETIG(
' '"Lrr' { �x�t.�i1.t Itillrlyl'11' 11r q!
Y
pv�T ,r li.tc
:y
>S
:r ,r
.. �. - 9F
9.
7F �� 1F
ilk
-44
It
tit n ; ``{_.�.,"dl 3:, -f •i ,Wy, -
Fw
� r •*vw r Wff .4r {'+. , -< '�, _ e :{ •y'1 9 '
i! '�,dY!' �+�'f' F�t.�}.-;t, x.� h moi' � �A"_• � •Gi�
dd
1,* ..
Ir
7
��Jiy`K'.'s.,� �� 6:;_+1Y�',r �'. 1IC'amu... •rnfl B" ,
"'�'- e. � ''�•�'�IV�M1�"'_""� -t o�.. t +a/' A�[�� ) a�' ; 4{i a } &� � �}S 'y�.
�y*� � fib:^..-. *fi'i.�'•$� 4�- ^'21
i ,of ��, �e"_ ��. , � •.�
�" nordTnb.
4
1
4
i
no
8t 9� 1 tiF 1E �r
110 � 11 II1F
r
�-, � �..
, ,�_ '
:��.
�,.
M'.� -P"k
3
;„�,
CITY OF PORT ANGELES
321 E 5TH STREET
P 0 BOX 1150
PORT ANGELES WA 98362
C E R T I F I C A T E O F O C C U P A N C Y
T E M P O R A R Y
Issue Date 6/01/09
Expiration Date 7/01/09
Parcel Number 06-30-00-5-0-0043-0000-
Property Address 123 E FRONT ST
PORT ANGELES WA 98362
Subdivision Name
Legal Description TIDELANDS N210 OF W2 LT4 BL 1
SUR V40 P40
Property Zoning CENTRAL BUSINESS DISTRICT
Owner Clallam Transit System
Contractor PRIMO CONSTRUCTION INC
360 683-5447
Application number 06-00001042 000 000
Description of Work COMM NEW CONST
Construction type
Occupancy type
Flood Zone
Special conditions
June 1, 2009 3 48 51 PM 1pangrle
This Gateway Project Temporary Certificate of Occupancy
is limited to only those areas accessed on the west side of
the transit building Fencing shall be maintained in
accordance with the March 27, 2009 memo from the Director of
Public Works and Utilities
The east parking garage is excluded from occupancy at
this time
All outstanding issues are to be addressed within 30
days (July 01, 2009)
A zoning lot covenant for the tire site must be filed
prior to issuance of the final Ce ifi ate o Occupancy
See the attached March 30, 09 ate
rom Nathan West
to Jim Mahlum for mo details
f
Approved �� w1L�
uilding Official
VOID UNLESS SIGNED BY BUILDING OFFICIAL,
. .. ..... O ^ i NGELES
Q.��.•` ,
WASHINGTON U SA
Ay —
Community & Economic Development Department
F`$ MjWt
,. March 30, 2009
Jim Mahlum
w
Project Manager
fk21 Public Works and Utilities Department
,R±auw �hfi�
Ci tY of Port Angeles
321 E. Fifth St.
x Port Angeles, WA 98362
Lx Subject: Gateway Project—Transit Building Temporary Certificate of Occupancy
123 E.Front Street—Building Permit 06-1042
Dear Mr Mahlum.
1zW:` This letter will serve as notice that temporary occupancy of the Gateway Project Transit Building
is hereby given. Temporary occupancy is granted-as of this date based on the information
provided in the March 2.7 2009 memo from the Director of Public Works and Utilities. At this
time, occupancy is limited to those areas accessed on the west side of the building. Fencing shall
? _ be maintained in accordance with the March 27ffi diagram of the above mentioned memo
" •._ Temporary occupancy is granted with the understanding that all outstanding issues will be
addressed within 60 days.(May 29 2009). Those issues have been identified in correspondence
dated February 18,2009,February 26, 2009 and March 9 2009 You are further reminded that a
zoning lot covenant for the entire site must be filed prior to.Certificate of Occupancy
In addition to those items noted above one of the areas excluded from occupancy(the east
,.,
�r� Parking garage)results in restriction of multiple parking spaces andparking.requirements not
met. Should concerns be raised regarding those requirements during the.period of temporary
occu ancY� mitigation may be required, or the temporary occupancy may be revoked.
Upon satisfaction of the remaining items you will be required to request all necessary.inspections
. 4 n to ensure the entire facile satisfies occupancy code requirements. If you have anquestions,
. .� h' P Y q Y Y
` please do not hesitate to contact me
Sincerely
I Nathan A. West,AICP
Director of Community and Economic Development
CC Glenn Cutler Dt-e,,or of Public Works and Utilities,City of Pott Angeles
Kent Myers,City ivlanager City of Port Angeles
' Phone 360-41>-4750 ' Fax 160-417-4711
'Nebsite www cityofpa us/ Erna sn-,artgrow.fhdcityofpa.us
` ,2 1 East eet P O Box 1 150 'Fo r,r WA 98362-021
, .
Northwestern Territories,Inc. JOB CONSTRUCTION
717 S. PEABODY
PORT ANGELES,WA 98362 REPORT
Engineers,Land Surveyors, Geologists DATE. 5/29/2009
(360) 452-8491 Fax(360)452-8498
Project: The Gateway Project Client: City of Port Angeles
Contractor- Pnmo Superintendent: Roland Ordona
Inspector Requested By- Jim Mallum Inspector- Shawn West
Weather- Clear Inspector Arrived. 9.00 AM
Inspector Departed. 10 15 AM
JOB # PRTA-0701
Remarks.
I arrived on site to observe procedure for Grout placement over the broken concrete on
the wall in the parking garage at the Gateway Center Concrete area was vleaned with a
brush before bonding agent was applied. Concrete bonding agent was used to cover the
area being grouted. Bonding agent was Tamms AKKRO-7T Liquid Bonding Agent.
Form boards were used to cover area. Grout used was Masterflow 555, which deviated
from the design which used Masterflow 500, which is no longer in production. Grout
was mixed on site.
Nothing Follows.
Northwestern Territories,Inc. JOB CONSTRUCTION
717 S. PEABODY
PORT ANGELES,WA 98362 REPORT
Engineers,Land Surveyors, Geologists DATE. 5/28/2009
(360) 452-8491 Fax(360)452-8498
Project: The Gateway Project Client: City of Port Angeles
Contractor- Primo Superintendent: Roland Ordona
Inspector Requested By- Jim Mallum Inspector• Shawn West
Weather- Clear Inspector Arrived. 6 50 AM
Inspector Departed. 9 05 AM
JOB # PRTA-0701
Remarks.
I arrived on site to observe procedure for embedding rebar into the fractured wall at the
Gateway projects garage. I met with Roland Ordona on site and Roy the laborer Upon
review of the plan set and the holes drilled into the wall I noticed that the pattern was
missing a row of 8 holes on the vertical. Roland had his plan set which he showed me
and it was obvious that the plan set was different. I gave Roland a copy of the plan set
dated 5/13/09 to replace the 3/18/09 set he was using. A row of 8 holes was added to the
pattern as per current plan set.
The temperature of the wall was 54.3 degreees F I observed 64 holes drilled into the
wall in a grid pattern spaced 12"on the horizontal and 10" on the vertical. The holes
were 3/4"wide and 8 ''/z" deep The pattern matched the plan set. Each hole was blown out
using compressed air for 4 seconds, brushed 4 times with a brush attached to a cordless
DeWalt, and then blown out for 4 seconds using air again. The epoxy used was Simpson
set 22. At time of use, a small amount was discharged from each canister to ensure
proper mixing of components. Each hole was filled '/z to 2/3 of the way from the back
pulling the nozzle forward. The rebar used was#5, l'-6 '/z long with a 10' hook. The
rebar was set into place using a twisting motion to the back of the hole It was then tied
horizontally to a—7' piece of rebar to allow for the hooks to be set in a vertical position
while curing.
Nothing Follows.
o n
s�. t �.r •� P �d.a
ter.
ti.
r
,Id's •y j I
T 1 tt
lit
RNr . a
ffi,kl
.MI '
�N k
E51tiy
NMI
JF
� a _
yy
a �•
Clallam 'Transit System (360)452 1315
mi-ma 830 W Lauridsen Blvd. 1-800-858-3747
Port Angeles,WA 98363 FAX(360)452 1316
www clallamtransit.com
Ric E o V E-
May
26 2009 MAY 2 7 2009
CITY OF PORT ANGELES
Dept.of Community Development
Nathan A. West
Director of Community and Economic Development
City of Port Angeles
PO Box 1150
Port Angeles WA 98362
Dear Mr West:
Clallam Transit System requests that the temporary occupancy granted to us for portions
of the Gateway Project on March 30 2009 be extended from May 29 2009 to June 30
2009 We expect that all outstanding issues will be resolved and a permanent
Certificate of Occupancy issued by that date
Sincerely
Terry G Weed
General Manager
(6//22009)Jim Mahlum RE. Substitution request Page 1
From <ab@brighteng com>
To 'Roland Ordona' <roland@primosequim com> Jim Mahlum <jmahlum@city
Date 5/20/2009 12 14 PM
Subject: RE Substitution request
Attachments. Simpson Set Adhesive.pdf
CC Jennifer Howell' <jen@primosequim com> 'Stan Cruse <scruse@parame
Stan/Roland
Proposed substitution is acceptable
Ade Bright, PE, SE
Bright Engineering Inc.
From Roland Ordona [mailto:roland@primosequim com]
Sent: Tuesday May 19 2009 11 49 AM
To Jim Mahlum
Cc: Jennifer Howell Ade Bright
Subject: Substitution request
Gateway delam
Is Simpson SET 22 ( <http.//www.simpsonanchors com/catalog/adhesives/set/>
http.//www.simpsonanchors com/catalog/adhesives/set/)an acceptable
alternative to Hilti HIT 150?
ROLAND ORDONA
Superintendent
Primo Construction Inc.
<mailto:roland@primosequim com> roland@primosequim.com
tel
fax:
mobile
<http.//www.plaxo com/click_to_call?lang=en&src=jj_signature&To=360%2D452%2D
5950&Email=roland@primosequim com>360-683-5447 ext. 5223
I(6/$/2'009)Jim Mahlum—RE Substitution request
<http.//www.plaxo com/click—to—call?lang=en&src=jj_signature&To=360%2D461%2D
1349&Email=roland@primosequim com> 360-461 1349
<https://www.plaxo com/add_me?u=47244720789&src=client_sig_212_1_card_join&i
nvite=1&tang=en>Always have my latest info
<http.//www.plaxo com/signature?src=client_sig_212_1_card_sig&lang=en>Want
a signature like this?
Page 1 of 1
Ade Bright
From Roland Ordona(roland@primosequim.com]
Sent: Tuesday May 19 2009 11 49 AM
To. Jim Mahlum
Cc: Jennifer Howell; Ade Bright
Subject: Substitution request
Gateway delam.
Is Simpson SET 22( http./twww.simr)sonanchars.com/Catalog/adhesives/set/)an acceptable alternative to Hilti HIT
150?
ROLAND OR.DONA Primo Construction Inc.
Superintendent
tel 360-683-5447 ext. 5223 0
fax.
roland@pnmosequim corn mobile: 360-461-1349
Always have my latest Info Want a signature like this?
NO EXCEPTION TAKE11) MAKE Co
REJECTED[3 ' ` RRECTIONS NOTEDREVISE D
SUSMrrSPECIFt D IT M�F_SUBMrr
CHECKING IS ONLY FOR GENERAL CONF0A,-0ANCE
CONCEPT WITH THE DESIGN
' OF THE PROJECT.AND C„ENERAI.COMPI IOJCC,E WITH THE
NFOaMATIQtJ 61VEN IN THE CONTRACT DOCLIVERT$ ANY ACTION
SHOWN IS SUBJECT TO THE REQUIREMENTS OF
SPECIFICATIC+NS, CONTRAL;TOR THE PLANS AND
IS "ESPONSIBLE FOR D.MENSfONS
WHICH SHALL BE CONFismE:) AIYJ CORRELATE:?AT TH' JC3E351TE
FABRICATION PROCESSES AND T-C IP�IOUF5 OF Ci7rI TRUCTITE
COOADiNA710A/OF TH{S WORK YVeTH H I
THE SATISFACTORY PERFORMANCE CF HE CONTQACTGRrP�DE5 A�tD
— -�� S VJQRK
DATE
5/20/2009
SET High Strength Epoxy-Tier Anchoring Adhesive'--Simpson Strong. http.//www.simpsonanchors.corWcatalog/adhesives/set/
www.simpsonanchors.com
SET High Strength Epoxy-Tie® Anchoring Adhesive
SET Epoxy-Tie®epoxy Is a two-component, 1 1 ratio,high solids,epoxy-based adhesive for use as a high strength,non-shrink
anchor grouting material.Resin and hardener are dispensed and mixed simultaneously through the mixing nozzle.SET meets or
exceeds the requirements of ASTM C-881 specification for Type I,il,N and V Grade 3,Class B and C.
GALLERY ROLLOVER IMAGES BELOW TO SEE 4 c
LARGER IMAGE
p P '
SET22 EKNUi EDT226
SET-PAC EZTM SET56 SET1,7KTA
Adhesive
U.S.Patent
6,634,524
USES
— LINKS
■ Threaded-rod anchoring ■ SuDDlemen
■ Rebar doweling tal Tics for Adhesive Anchors
Estimating guide
■ Bonding hardened concrete to hardened concrete .■ Estimd Warranty a Information■ Pick-proof sealant around doors,windows and fixtures ■ Tension and Shear Load Tables
■ Paste aver for crack injection ■ 1_Qad-Adiwilment Factors
CODE REPORTS ' Documents:
■ Anchor Catalog Section(PDF)
■ ICC Evaluation Service ESR 1772(formerly ICBO-ES ■ Product Subrrdbl(PDF)
ER-5279)(PDF)(CMU& URM) • Material Safety Data Sheet SET'(PDF)
• City of L.A.RR25279(PDF) ■ Material Safety Data Sheet SET en Espanol(PDF)
• Caltrans approved ■ SET PAC-FZTM E -TiAnchoring Adhesive Flier
■ Florida Statewide Product Approval FLIJ506.4 (PDF)
■ multiple DOT listings ■ Rebar Yield and Tensile StrmiO Ernbedments
■ NSF/ANSI Standard 61 (216 int/1000 gal)(PDF),except Technical Bulletin(PDF)
SET1 7KTA ■ *Rebar Yield and Tensile Strength Embedments
�, (Canada)Technical Bulletin(PDF)
■ SET-PAC EZ adhesive covered by ICC-ES,City of L.A. ■ Anchor Tension i Chair Bock
and NSF/ANSI listings only
Technical Bulletin(PDF)
■
®The load tables list values based upon results from the City of Los Angeles RR Vahm for FIDldownsin Shearwall and Wall Anchorage Assemblies
most recent testing and may not reflect those in current code Technical Bulletin(PDF)
reports.Where code jurisdictions apply consult the current . Free Technical
reports for applicable bad values.
1 of 3 5119/2009 11.58 AM
SET High Strength Epoxy-TieO Anchoring Adhesive—Simpson Strong. http://www.simpsonanchors.com/catalogladhesives/set/
. Anchor Designer
APPLICATION
■ Adhesive Estimator _
Surfaces to receive epoxy must be clean.For installations in
or through standing water see Supplemental Topics forACCESSORIES 1 RELATED PRODUCTS
Adhesive Anchors for details.The base material temperature
must be 40°F or above at the time of installation For best ■ Dispensing Tools
results,material should be 70` 80°F at the time of ■ Mixing Nozzles
application.Cartridges should not be immersed in water to ■ Plastic Anchoring Screens
facilitate warming. To warm cold material, the cartridges ■ Steel Anchoring Screens
should be stored in a warm,uniformly heated area or storage . Hole Cleaning Brushes
container for a sufficient time to allow epoxy to warm _
completely Mixed material in nozz%e can harden in 5-7 SUGGESTED SPECIFICATIONS
minutes at a temperature of 40°F or above.
Anchoring adhesive shall be a two-component high-solids
TEST CRITERIA epoxy based system supplied in manufacturer's standard
cartridge and dispensed through a static-mixing nozzle
Anchors installed with SET Epoxy-Tie®adhesive have been supplied by the manufacturer Epoxy shall meet the rninimum
tested in accordance with ICC-ES's Acceptance Criteria for requirements of ASTM C-881 specificalion for Type I, Il, N
Adhesive Anchors(AC58)for the following• and V Grade 3,Class B and C and must develop a minimum
■ Seismic/wind loading 12,650 psi compressive yield strength after 7 day cure. Epoxy
■ Long-term creep at elevated-temperature must have a heat deflection temperature of a minimum 136°F
■ Static loading at elevated-temperature (58"C).Adhesive shall be SET Epoxy-Tie®adhesive from
■ Damp and water-filled holes Simpson Strong-Tie,Pleasanton,CA.Anchors shall be
• Freeze-thaw conditions installed per Simpson Strong-Tie instructions for SET
• Critical and minimum edge distance and spacing Epoxy-Tie®adhesive.
In addition,anchors installed with SET Epoxy-Tie®adhesive ASD DESIGN EXAMPLE
have been tested In accordance with ICC-ES's Acceptance
Criteria for Unreinforced Masonry Anchors(AC60) For design example,click here.
INSTALLATION
PROPERTY TEST METHOD' RESULTS IMPORTANT For installation instructions,click here.
Consi�ncy ASTM C 881 Note-sag/
I
thixatropic paste SHELF LIFE
Heat deflection ASTM D 648 136"F(58°C) 24 months from date of manufacture in unopened side-by-side
J_
Bond strength _ASTM C 882 3,218 psi(2 days) r cartridge'SET-PAC EZTm cartridge 24 months from date of
(moist cure) j 3,366 psi(14 manufacture,unopened.
(I days) STORAGE CONDITIONS
Water absorption ASTM 0 570 0.110%(24 hrs)
For best results store between 45°F 90°F To store partially
Compressive yield ASTM D 695 5,065 psi(24 used cartridges leave hardened nozzle in place.To re-use,
strength hours) attach new nozzle.
12,650 psi(7
days) COLO R
Compressive ASTM D 695 439,000 psi(7 Resin—white,hardener—black
modulus days) When properly mixed SET adhesive will be a uniform light
Gel time(75°F) ASTM C 881 30 min 60 gram gray color
ryl
ss
0 rrti
60 ti n thin film CLEAN UP
6n
Uncured material—Wipe up with cotton cloths.9 desired
scrub area with abrasive,waterbased cleaner and flush with
water If approved solvents such as ketones(MEK,acetone,
etc.),lacquer thinner or adhesive remover can be used. DO
NOT USE SOLVENTS TO CLEAN ADHESIVE FROM SKIN.
Take appropriate precautions when handling flarnmable
solvents.Solvents may damage surfaces to which they are
applied.Cured material—Chip or grind off surface.
2 of 3 5/19/2009 11 59 AM
SET High Strength Epoxy-Tie(&Anchoring Adhesive--Simpson Strong. http://www.simpsonanchors.corgi/cataloeadhesives/seV
CHEMICAL RESISTANCE
Very good to excellent against distilled water inorganic acids
and alkalis.Fair to good against organic acids and alkalis,and
many organic solvents.Poor against ketones. For more
detailed information download Technical Bulletin T-SAS-
CHEMRES08(PDF).
SET Cartridge Systems
1°
t 14tti�s�" oantt a .�ot1t>��gi�°_ ��tlltt�ilb � i� Y�l�1 � M>sldslg�.
i.7 Adaptor 14dludl d' EMN1.7
SET ATA (3.1) side-by-sl6a 12 for standard .'. .
t ' T1;41k"; �y `• ! Tift Si &#'i„. �}t�ii7 t ' { "FR�y�}'{
�. _ _� � i �� �.i• �:....iul��tt w"tt�t►4 � i
Ei)T228 DT22AP' -
SET22 ,3 _`7 &t)-sidt ^10 •ttr.E1}t22ijt<4-
OF"i, EMN22i
' c
F' •'�.. �° � K
SEMC sftl mil - El?T A i,.
•,
M.
1ol..1'
1 Bulk containers also available,contact Simpson Strong-Tie for details.
2. Cartridge and bulk estimation guides are available.
3. Detailed information on dispensing tools,mixing nozzles and other adhesive accessories is available.
4 Use only appropriate Simpson Strong-Tie mixing nozzle in accordance with Simpson's instructions.Modification or
improper use of mixing nozzle may impair epoxy performance.
Cure Schedule In-Service Temperature Sensitivity
,Iliax6lllahrial � •illas�Mtttartii!• •�,Penestlt°
Te>opatatrre ` � >' ; Ti�iip�radani� :$;��lwi�il�to
*F;
40 4 72 hrs.� 40 4 100%
X65 f8 w 24-firs: '-70
85 19 .20 hrs. 110 43 'f00o
150 86 4496
:180. '827 2096:--
1 Refer to temperature sensitivity chart for allowable
bond strength reduction for temperature.See
Supplemental Topics for Adhesive Anchors.
2. Percent allowable load may be linearly interpolated for
intermediate base material temperatures.
3. °C=ff 32)/1.8
top A
Printed May 19,2009 from http:/lwww.simpsorianrhors.comlcatalogtadt"ves/sett ®2008 Simpson Strong-Tie®
3 o f 3 5/19/2009 11 58 AM
TEGitlg[CftLiBiJl:LE7'!Af
Epoxy;- +
3tmng-TIe
�' ;iiucxtae:arsrsciear�
i . t t i r-d
Tests have been performed to establish load capacities for rebar dowels installed at multiple embedment depths
with Epoxy-Tie SET adhesive.Using these results, the embedment depths required to develop the yield or tensile
strengths of Grade 60 rebar have been calculated and are presented below.
Tension Loads,and,Oevilopmd6i-.Lwgths46rReber Davirets in t�cHatal'-Wdi Concrete '
40
41i' * i.CliSDYiri. •-1,Hfifntate. �YL." .i' il1r 1`tt
sill„, •.:w,. 'l�,nrrrr, r+"'..
t`ptoA a61a inn, 1d1 ;vas` , 1° '' :
�( F)i Gi: , � 1; � �� `' _ ,�,. t ,�t ti , .�� f. :��-•meq, ,.
n'
t, r fmretl ti •.: ii" fb,1i'a,' "
4 14, 10; 0
r4 S18 1081- l! 73:.3 4 114 5 1/4 8t _ 4 1/4 4 114 12,000 ' 18,000
4 (12.7) '6; MR (108) (133) 19f360 (108) (108) (53.4) (80.1)
r73. .+•iY. ' 4. '� IF71..,
('I , j. ' ajs`40;3�xa h~23 (f �t ,R �i t1A0 t821
1,611A.' 38;380- - 40c500
!6 . 718 E .17;# 171 6 314 7 180 6 314", 6 314 26,400 ; W39,600 1i
i, (19.1) !112 6S8020 (171) (178) 691 2890 (171) (171) (117) (176)
1-4
MAR
63,680 — _ -- —
#8 1 118 1229'. 239 9 11 314 39 9 11 314 '47,400 71,100
# (25.4) 1,6 94,240 (229) (298) 94;240 (229) (298) 1 (211) j (316)
[ l)?) (419) 1 (419
i1'. 24; 2 ;j
MAN
g ,
. (' �'
}. -11 till: 76,000 _._ ._. 76,000 _._. ..
! #10 �! 1 1/2 . 246° 338 11 112 17 114 33 11 1/2 17 114 76,200 114,300
(31.8) 18'34 125,840 (292) (438) 125;840 (292) (438} (339) (509)
!47/1 r° 560 _ 560 ., . •- .. _... .._-.. ...
i1p�
1.Development lengths are based on comparison of average ultimate bond strengths S.Andtws are not permitted to support fre•resbstW cohswction.Where
from,testing in unreirdoroed concrete to minimum yield and tensile strengths.of rebar, not otherwise prohibited by code,anchors are per milted for instetba8on in
2.Critical edge distance is 1.5 times embedment depth and critical spacing is 4 times fire•reslstive construction provided that at least one of the fonoviing conditions
embedmer.,depth for unreinforced concrete.Refer.to C SAS-2008 for load is fulfilled,a)Anchors are used to resist wind or seismic forces only.
adjusimert facto*for lesser spacings and edge dwances.Critical edge distance and b)Anchors that support gravity load-bearing structural elements are wain e
critical spacing may be reduced when anchoring into reinforced concrete members. fire resistive envelope or a fire•resisdve membrane,are protecwd by approved
3 Refer to catalog C SAS-2008 for load adjusimenc factors For in-service temperature. fire•resfstive materials,or have been evaluated for resistance to fire exposure
4-Development lengths may be mterpolared for concrete compressive strengths In accordance with recognized standards.c)Anchors are used to supe m
e between 2,000 psi and 4.000 psi. nonstructural elements.
fits techmkol bulletin is effective until Iritic 30,2070,arul reflects iitlavrzration 8ysilable as of tipr;l 1,20049.This frifmm illon is irpdafedperiod;calry olid
*child not be relied upovt afar lune 30,2070;coact Simpson Strang-ria lar CUFFM utlonmdon end limited wawalWy or seo aww,simpsamnidmrs.com.
j ,eillm a i' #1 }_. !ma's
3�s93&.riV,'l:„4 iWtiw 3(" t1,T5oE ,..7 1t1i..,WrSi
! Jl '• v
Y A. + ° F-•" ,. 4r:a v"w`4s.^t-.•P{ .-r -• •� „.m r ;Y:* •• ..,.
rt,yw,ru,ii' ,•+� n
>ai:,n# 'li
1 (If+tx` J g ' � ,,^ f 4x1274 aiifi`,y1t4` !eai '`` >xA„wj,- nw.ai �f{g;.
(6%9{2009)Jim Mahlum RE Rebar hook
H
From <ab@brighteng com>
To 'Roland Ordona <roland@primosequim com>
Date 5/20/2009 1205 PM
Subject: RE Rebar hook
cc 'Stan Cruse <scruse@parametrix.com> Jennifer Howell' <jen@primose
Stan/Roland
Rotate bars to achieve specified clearance
Ade Bright, PE, SE
Bright Engineering, Inc
From Roland Ordona [mailto roland@primosequim com]
Sent: Wednesday May 20 2009 11 18 AM
To Ade Bright
Cc: Stan Cruse, Jennifer Howell• Jim Mahlum
Subject: Rebar hook
Ade, the (ACI) recomended hook on a#6 bar is 12' Would you like to
shorten this or turn it in the wall to allow clearances?
Let me know as soon as you can so I can get these made
Thanks
ROLAND ORDONA
Superintendent
Primo Construction Inc.
<mailto:roland@primosequim com> roland@primosequim com
tel
fax:
mobile
<http.//www.plaxo com/click_to_call?lang=en&src=jj_signature&To=360%2D452%2D
5950&Email=roland@primosequim com> 360-683-5447
360-683-6475
x(6/9/2009)Jim Mahlum RE. Rebar hook Page 2
<http.//www.plaxo com/click—to—Call?lang=en&src;=jj_signature&To=360%2D461%2D
1349&Email=roland@primosequim com>360-461 1349
<https://www.plaxo com/add_me?u=47244720789&src=client_sig_212_1_cardJoin&i
nvite=1&tang=en>Always have my latest info
<http.//www.plaxo com/signature?src=client_sig_212_1_card_sig&lang=en>Want
a signature like this?
(6/3, 009)Jim Mahlum RE. Delamination Fix-Change Order M v W �m Page 1 j
From <ab@brighteng com>
To 'Roland Ordona <roland@primosequim com> 'Stan Cruse <SCruse@param
Date 5/20/2009 12.01 PM
Subject: RE. Delamination Fix Change Order
CC Jim Mahlum <Jmahlum@cityofpa.us> 'Diane Lenius <DLenius@parametr
Stan/Roland
Masterflow 550 is acceptable
Ade Bright, PE, SE
Bright Engineering, Inc.
-Original Message-
From Roland Ordona [mailto-roland@primosequim.com]
Sent: Wednesday May 20 2009 9 56 AM
To Stan Cruse Terry Weed, James Dugan
Cc: Jim Mahlum ab@brighteng com Diane Lenius
Subject: RE. Delamination Fix Change Order
Stan/Ade I just spoke with a BASF rep in Seattle, and he told me that
'Masterflow 500' was no longer available He suggested Masterflow 928(a
more expensive product)which he calls the Cadillac or grouts or masterflow
555
Could you review these products and let me know which one you would like,
or if you have another product in mind
-Original Message-
From Stan Cruse [mailto SCruse@parametrix.com]
Sent: Tuesday May 19 2009 11 51 AM
To Terry Weed James Dugan
Cc- Jim Mahlum ab@brighteng com Diane Lenius
Subject: RE. Delamination Fix Change Order
Terry
Answers requested
1 Use 5' schedule 40 PVC pipe
http.//www.apiplastics com/pvc_pipe_dimensions html
2 Hooks are to be detailed fabricated and erected in accordance with the
Manual of Standard Practice for Detailing Reinforced Concrete Structures per
ACI 315 in the structural notes
Please let us know what day next week other than Monday(Holiday) you would
like Ade there.
Parametrix 40th Anniversary 1969-2009
inspired people inspired solutions making a difference
Stanley C Cruse, AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax:253 752 9865
cell 360 710 6425
scruse@parametrix.com
? Before printing, please think green
i(6/f��009)Jim Mahlum RE Delamination Fix Change Order Page 2�
-Original Message-
From Terry Weed [mailto-tweed@clallamtransit.com]
Sent: Tuesday May 19 2009 9.51 AM
To James Dugan Stan Cruse
Subject: FW Delamination Fix Change Order
Terry G Weed
CLALLAM TRANSIT
General Manager
360-452 1315
-Original Message-
From Jennifer Howell [mailto:jen@primosequim.com]
Sent: Tuesday May 19 2009 9 17 AM
To Jim Mahlum 'Roland Ordona'
Cc: 'Glenn Cutler' 'Kent Myers' 'Steve Sperr' tweed@clallamtransit.com
Subject: RE. Delamination Fix Change Order
Jim
Please see the attached signed change order Please note that Roland is
still waiting on some answers from you with regard to the pipe before he can
order it. Should we get these answers today we are requesting that Ade be
on site Monday as we will start chipping.
Thank you
Jennifer
-Original Message-
From Jim Mahlum [mailto.Jmahlum@cityofpa.us]
Sent: Tuesday May 19 2009 8 37 AM
To Jennifer Howell Roland Ordona
Cc- Glenn Cutler- Kent Myers, Steve Sperr• tweed@clallamtransit.com
Subject: Delamination Fix Change Order
Jennifer& Roland
Attached is Change Order Number 52 for the delamination fix. Please sign and
return for final signature Consider this as authorization to proceed with
the work as outlined in the attached change order
Jim
N U 8 1-O" A
WWF4x4-W4xW4
NOTES,
1 "EPDXY" SHALL BE HILTI HIT 150 OR APPROVED EQUAL.
2. CONCRETE TO HAVE COMPRESSIVE STRENGTH f'c = 4000 psi AT 28
* _! DAYS, 3/B MAXIMUM SIZE AGGREGATE.
IL3. REINFORCEMENT TO ASTM A615 fy = 60 ksi.
f
• • • • • • •
4. BEARING PAD TO BE JW INC MASTICORD OR APPROVED EQUAL.
"� ^ 5. NON-SHRINK GROUT SHALL BE MASTERF.LOW 500 BY MASTER BUILDERS
OR APPROVED EQUAL
A/ _ 4-3" 3"-D'
AS BUILT Al 6. DOWELS SHALL NOT COMPROMISE EXISTING WALL REBAR. DOWELS SHALL
HOOK OVER INTERIOR VERTICAL WALL BARS.
PLAN HDPE PIPE SLEEVE"OD
SCALE. 3/4"=1'-0" TAPE SEAM TO KEEP
OUT CONCRETE
I
6 A 8
EXISTING SLAB m PB3
f RECEI7-no-
---EXIST
! I PLAZA EL 21-7"
- "
4"DIAMAY 1 8
EXISTING WALL j DI PIPE d s
.I CITY OF PORT ANGELES N
BEARING PAD AND BUILDING DIVISION W
COMPRESSIBLE EXISTING 1 r
FILLER DIAGONAL WALL �^ V
REMOVE LOOSE I "
CONCRETE AROUND
BEAM
i
t
• • .• • • PB3
•• • .• :• .• • 't I1•• • • '•#6®12 EF i I PLANHOOK TOP • • • • 1 • j • •!I i • • • • b• 41N-• ,• -• • • II• •I
I
00
#6012 OF • • • • • • •` • •
ALT HOOKS I II it I I
I
it I:
#6012 IF BEARING PAD 6x30x1/2"
GRADE SLAB (GLUE TO UNDERSIDE OF
I, EL 10 o— BEAM)
�1-6 1/2" • s
EPDXY 64#SJ�EMBED B 1/2" I I BONDING AGENT 112-FILLEROMPRESSIBLE
INTO EXISTING WALL SEE NOTE 6
REMOVE LOOSE CONCRETE
AND*CLEAN SURFACE FOR E7/2"x6 x30 w/
NON-SHRINK GROUT (2) 3/4"DIA x4"
REMOVE PIPE CLAMP • • STUDS ® 18 GA
AND REINSTALL AFTER
1-0' 1-0'±]. SLEEVE IS IN PLACE
m
ELEVATION SECTION �� DETAIL
SCALE. 3/4 =1-0" — 8R> G
6..• C�� i�` SCALE. 3/4=1-0' — SCALE. 1 1/2"=1-0"
NO. REMSIDNS DATE BY DE'GNED O 2' `
A. BRIGHT L f BRIGHT ENGINEERING, INC - SNEET No
DRAWN TA INC6SS FULL SCALP , ,�� ca�,eulting St—tumf a M41�'nyrneesing PORT ANGELES INTERNATIONAL FS-18
E. THOE lF A'AT SCALE ACCORD7NCLY ^fin'•., �'"V? ,� 1809 M Avm—, .7 .te 1100 GATEWAY TRANSPORTATION CENTER
C ! PIPE ENCASEMENT 15-13-09 P. BRIGHT CNECI(ED S6 NC -J
B BOB MAST 2-24-09 COMMMENT 13-6-09 A. BRIGHT AS SHOWN At-t' Seattle IIA 98101
! A BRIGHT AFF70VE0 DAIS JOB vVMBER 7'NAME REPAIR T
o6-6Z5-5777 'a 208-ezS-1851
A 2-10-09 A I PB3
5-13-09 11 I6.�31R FS-i8.Ew9
a B A
—1
1-6 WWF4x4—W4xW4
U
1NOg'OXY' SHALL BE HILTI HIT 150 OR APPROVED EQUAL
2. CONCRETE TO HAVE COMPRESSIVE STRENGTH Pc = 4000 psi AT 28
.'.Rf _ _ _I DAYS, 3/8 MAXIMUM SIZE AGGREGATE.
S p • • • :1*
I� • • J. REINFORCEMENT TO ASTM /i615 fy = 60 ksi.
• • L10 Lot • • • I '4. BEARING PAD TO BE JVI INC MASTICORD OR APPROVED EQUAL.
a�
3 I M v + I 5. NON—SHRINK GROUT SHALL BE MASTERFLDW 500 BY MASTER BUILDERS
^ ^ OR APPROVED EQUAL
Al— 4'-3" 3'-0' _
Al
AS BUILT 6. DOWELS SHALL NOT COMPROMISE EXISTING WALL REBAR. DOWELS SHALL
HOOK OVER INTERIOR VERTICAL WALL BARS.
(2) HALF ROUND
PLAN HDPE PIPE SLEEVE"OD
SCALE. 3/4`=1—D" TAPE SEAM TO KEEP
OUT CONCRETE
B A 8
I
EXISTING SLAB m P83
I PLAZA EL 21=7" I
i
EXIST 4"DIA s
EXISTING WALL D! PIPE. a •'
BEARING PAD AND
COMPRESSIBLE 1 s
FILLER EXISTING _
a DIAGONAL WALL
REMOVE LOOSE
CONCRETE AROUND
BEAM
PB3
� I
• • . • • . '• M • •
• • • • p• I—o".
,¢'6012 EF I PLAN •
HOOK TOP • • • • ;• •` �I co 2" CONC
I
I �
to � COVER
• • • • • !I !• 44 II
' 1 1 2` CONC
I s I I I • • COVER
• • • • • ! i• •I co
I
X60120
F • • • • • I • •
ALT HOOKS I iF j F I
I I a
• • BEARING PAD 6x30x1/2"
#6012 IF 1 ; GRADE SLAB (GLUE TO UNDERSIDE OF-
-c
F "
E 1L 0 0 BEAM)
��1'-6' 1/2` •
EPDXY 64#51— EMBED 8 1/2` APPLY CONCRETE 1/2' COMPRESSIBLE
INTO EXISTING WALL.SEE NOTE 6 I r BONDING AGENT FILLER
REMOVE LOOSE CONCRETE EI12 x6"x30" w/
AND CLEAN SURFACE 'DIA W
FOR '
NON—SHRINK GROUT • • S(2) 31
8 GA
i REMOVE PIPE'CLAMP IIA
AND REINSTALL AFTER
1—0"1 SLEEVE IS IN PLACE
m
ELEVATION �A� SECTION DETAIL
SCALE. 3/4"=1—0` — F . w BRi��f OG` SCALE. 3/4"=1'-0" — SCALE. 1 1/2 =1'-0' —
ND. RENSIONS DATE By oE51BRIG D _ BRIGHT ENGMMING,INC s+E�c Nu
.D„ �,T ` ConsuK8�6 SOuctural&Civil ffo?& eerinp PORT ANGELES INTERNATIONAL x-78
�.e rNca—rS p�S�,.e GATEWAY TRANSPORTATION CENTER
L THOE LF Nal'scare accortnrvctr r, 6 1808 7th Avenue, Suite 1100
C .PIPE ENCASEMENT 3-13-09 A BRIGHT tlffCXED SCALE AL'� Seattle IIA 68101
B BOB MAST 2-24-09 COMMMENT 3-B-09 A BRIGHT AS SHOWN 206-6P6=8777 Far 206-625-1851 REPAIR A T P B 3
APPR VED .DATE JOB NUTABER in'NAME
A, 2-10-09 A BRIGHT 5-i}09 111fi:03R FS-1&,I
(5/6/2009) Linda Parigrle Fwd Re PDN-Tom Callis- Records Request Page 1
From Nathan West
To, James Lierly, Linda Pangrle, Sue Roberds
Date: 5/5/2009 11 35 AM
Subject: Fwd Re PDN-Tom Callis Records Request
Please ensure you provide to me all records of communication per Becky's email below and no later than 8.00 AM Friday May 8th.
Keep in mind this only applies to communications between us and the external entities between the dates of September 1, 2008 to
April 10,2009
Thanks
iQ g�vev �o
Nathan
>>> Becky Upton 5/5/2009 1105 AM >>> -40 �v
Tom clarified the request:
'Communication between the city and Clallam Transit relating to the
structural problem with the pavilion's eastern foundation wall and
proposed repairs, and communication between the city Krei Architecture,
Parametrix,and Bright Engineering on the same subjects.
This includes communication from the city to those parties and from
those parties to the city
Based on this clarification, Mr Callis did not ask for City to City communications.
Becky
1(4/13/2009) Nathan West Gateway Project g
From. 'Tracy Gudgel' <tracy@zenovic.net> � C
To 'Nathan West' <Nwest@cityofpa.us>
Date: 4/13/2009 158 PM
Subject: Gateway Project
Nathan,
The following is a list of the documents that I believe should be included:
1 Original Structural Calculations which do have a small set of the
structural drawings. It may be wise to add a note about the 45 degree wall
and the fact that it doesn't show in the calcs.
2. A copy of all my letters If you would like dates I can get them to
you. First one 9-12-08 last one 4-1-09
3 A copy of Brights letters, some of which are noted below
4 A copy of Transits Letter dated March 25 with Bright's response
dated March 30 and My response dated April 1 2009 (my letter is one of the
letters noted in item#2 above)
5 Brights repair plan dated 3-6-09
6 Masts Letter dated 2 24-09
7 Brights Calculations and Sketch Dated 2 10-09
8 Masts Report Dated January 23 2009
9 Notes of Meeting with Mast dated 1-2-09
10 Brights response.dated October 28 2008
11 Email from Bright to Ingo Primo etc dated 3-5-08 which is reply to
Ingo's email dated 3-4-08 which includes pictures of spalling etc.
12. Pictures I took dated 9-22-08 which show the spalling and other
cracks. These pictures are not labeled as to location.
Let me know if you need something else or need me to put copies together
Tracy Gudgel,
Zenovic&Associates, Inc.
4
Lincoln Street Station
403 S. Lincoln St. Suite 4
Port Angeles, WA 98362
(360) 457-4343
Track your packages at our website
www.lincolnstation.us
06
�3
Shipment------------------- \
FedEx Ground Commercial
Ship To
Kip Gatto
Wiss, Janney, Elstner Assoc., Inc.
960 South Harney Street
SEATTLE, WA 98108
Package ID 75106 10.99
Expected arrival Thu 04/16 11 59 PM
Actual Wt 7 lbs 2 ozs
Rating Wt 8 lbs
Pkg Dims 12.15 x 12.15 x 9.15
Packing 2.00
Large Cube Box 2.00 TX
Peanuts 1/4 c 2 @ 0.10 0.20 TX
SUBTOTAL 15.19
TAX
Standard Sta on 2.20 0.19
TOTAL
TEND Acct - Credit 15.38
Account 1
City of Port Angeles
04/15/2009
#79457 10 06 AM
Signature
a Gys�0
All shipments are subject to t terms
and conditions posted in the store at
Page 1 of 1
Sue Roberds - FW Pt Angeles
From "Bill Roberds"
To "'Sue Roberds"'
Date 4/9/2009 4 17 PM
Subject- FW Pt Angeles
From Richard Howell [mailto Richard W Howell@us.mwhglobal.com]
Sent: Thursday, April 09, 2009 3 33 PM
To: 'bill@cpifiber.com'
Subject: Fw• Pt Angeles
Bill plz forward to Sue I just was talking with her and she knows a msg like this (below) is coming Thx. Dick
RW Howell
LL 425 896 6983
BB 425 503 6656
From Hijazi, Mark
To Richard Howell
Sent: Thu Apr 09 16 30 33 2009
Subject: RE Pt Angeles
Hi Dick: I was in meeting all afternoon I talked to Doug Jamison and he is happy to help
I will have him call Nathan and let them talk.
Regards
Mark H. Hijazi,P.E.
Senior Structural Engineer
HDR I ONE COMPANY I Many Solutions
500 108th Ave. N.E Suite 1200 1 Bellevue WA 198004-5549
Main 425 450 6200 1 Direct:425 450 7116 1 Fax:425 453 7107
Email- Mark.Hijazi hdrinc.com
From Richard Howell [mailto Richard W Howell@us.mwhglobal.com]
Sent: Thursday, April 09, 2009 12 20 PM
To: MMHijazi@comcast.net
Subject: Pt Angeles
Mark,
The person to call is Nathan West. He is in mtgs in Belllingham today His tele is 360/461-5967
file.//C \Documents%20and%20Settings\Sroberds\Local%20Settmgs\Temp\XPGrpWise\4 4/10/2009
(4/7/2009) Nathan West-structural engineer -..____._«_ m__ T_- _ Page 1 ,
From William Bloor
To: Kent Myers, Nathan West; SCroll@kbmlawyers.com
Date: 4/6/2009 4.34 PM
Subject: structural engineer
** Confidential **
CC: Ann Bennett
I spoke with Ann Bennett this afternoon. She agreed that WCIA will pay for a structural engineer to consult on the current
Gateway questions. These are the conditions:
the engineer will be hired through KBM,
the engineer will be considered an expert retained to advise the City Building Official on the application and
interpretation of code issues
the engineer will be preserved as an expert witness in the event any litigation follows;
the engineer will not be asked to design a fix,only to advise the City Building Official on whether a fix proposed by the
project engineer does or does not satisfy the applicable codes.
ANN- If I have misstated, please correct.
KENT STEPHANIE, NATHAN: I suggest that within the next 24 hours we take a few minutes(should not take more than
15 minutes)to coordinate and talk about the next CC meeting.
Thanks.
Bill
William E. Bloor
City Attorney
Port Angeles
360 417 4531
wbloor@cityofpa.us
ATTORNEY-CLIENT PRIVILEGED COMMUNICATION
CONFIDENTIAL
NOT FOR PUBLIC RELEASE
Page 1 of 1
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Jim Mahlum, Sandie Barnhart, tweed@clallamtransit.com, igoller@xltech.com
Cc: Diane Lenius; James Dugan, Tom De Laat, Roger Horton
Date- 04/03/2009 09.44.03 AM
Subject: Certificate of Substantial Completion
TEXT.htm
PA Gateway SubS..tan.Cowl. 4-03-09_pdf
Jim,
See attached Certificate of Substantial Completion for signatures.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com<mai tto:scruse@parametrix.com>
file.//C \Documents and Settmgs\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 1 of 5
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Jim Mahlum, amanda@primosequim.com
Cc: Sandie Barnhart, tweed@ctatlamtransit.com; igoller@xttech.com
Date* 04/03/2009 08.09.40 AM
Subject: RE. West Garage Certificate of Substantial Completion
I cannot use this form I received from Ingo it is water marked with Reproduction I cannot legally use as an AIA
member I will use a Krei form. I will have it for you today
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
-Original Message-
From Jim Mahlum [mailto:Jmahlum@cityofpa.us]
Sent: Friday April 03 2009 7.24 AM
To. amanda@primosequim.com
Cc: Sandie Barnhart; tweed @c[allamtransit.com; Stan Cruse- igoller@xltech corn
Subject: West Garage Certificate of Substantial Completion
Amanda,
Here is a pdf of the Certificate of Substantial Completion with all of the signatures for your files.
Jim
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
CTS.and COPA Meeting
Port Angeles International Gateway Project
Wall Repair Under PB3
April 3, 2009
Attendees
Craig Miller Attorney, CTS
Glenn Cutler Director PW&U CTS and COPA
Nathan West Building Official, COPA
Tracy Gudgel Building Official Consultant, COPA/Zenovic
Dennis Dickson Senior City Attorney, COPA
Agenda
1 Introduction - Purpose of Meeting (Clallam Transit)
2 Expectations for meeting framework (CTS and COPA)
3 Clarification of Building Official's Position (Nathan West)
4 Berger/Abaco clarification of 24 February 2009 Ltr (Bob Mast)
5 Code Sections 117 and 17 5 (Bob Mast and Tracy Gudgel)
6 Discussion btwn Mast and Gudgel (Bob Mast and Tracy Gudgel)
7 Path forward (All)
Tentative Agenda
I Introduction—Purpose of Meeting(GC)
2. Expectations for meeting behavior(NW, GC)
a. We are here to help clarify the issue so that you as the proponent can get it
resolved.
b We are not here to be threatened or interrogated. If that occurs we will
have no choice, but, to discontinue the meeting.
3. Clarification of Building Official's Position (NW, TG)
a. My primary goal is to protect the public's health, safety and welfare
b Second goal is to ensure that this project complies with the building code
c. Of primary concern is that we have not received calculations that reflect
the latest design.
d. The calculations we have received do not meet section 117 of ACI 318
e We do not have a choice the project must comply with code
f. How do you propose that I approve something that does not meet code?
4 Mast Comments on Building Official's Position (BM)
a. Do you agree that Section 117 applies?
b If no, lets assume that it does how can we get a design and documentation
that comply with that section.
5. Discussion btw Mast and Gudgel (BM,TG)
a. Solutions to complying with code
6. Determine path forward (all)
a. What would it take to get us the necessary calculations
b Pre approve fix drawn by Mast? Written?
Tentative Agenda
1 Introduction—Purpose of Meeting(GC)
2. Expectations for meeting behavior(NW, GC)
a. We are here to help clarify the issue so that you as the proponent can get it
resolved.
b We are not here to be threatened or interrogated. If that occurs we will
have no choice, but, to discontinue the meeting.
3. Clarification of Building Official's Position (NW, TG)
a. My primary goal is to protect the public's health, safety and welfare
b Second goal is to ensure that this project complies with the building code
c Of primary concern is that we have not received calculations that reflect
the latest design.
d. The calculations we have received do not meet section 117 of ACI 318
e. We do not have a choice the project must comply with code
f. How do you propose that I approve something that does not meet code?
4 Mast Comments on Building Official's Position (BM)
a. Do you agree that Section 11 7 applies?
b If no, lets assume that it does how can we get a design and documentation
that comply with that section.
5. Discussion btw Mast and Gudgel(BM, TG)
a. Solutions to complying with code
6. Determine path forward (all)
a. What would it take to get us the necessary calculations
b Pre approve fix drawn by Mast? Written?
Krel Architecture Form 01-CN-02/Rev.12101
CERTIFICATE OF SUBSTANTIAL COMPLETION
Project: Port Angeles International Date: April 3,2009 Owner-Claliam Transit System
Gateway Transportation Center 830 W Lauridsen Blvd.
123 E. 15t Street Port Angeles,WA.98362
Port Angeles,WA.98362
Contractor- primo Construction,Inc. Project Number, 701-3116-001
970 Carlsborg Road
Sequim,WA.98382
Date of Issuance: April 3,2009
The Base Bid construction Transit Building, Elevator and Transit Lanes and
DESIGNATED AREA SHALL INCLUDE: Sidewalks.
The Work performed under this Contract has been Inspected by authorized representatives of the Owner Contractor and
Engineer and the Project(or designated area of the Project, as indicated above) is hereby declared substantially completed.
The Substantial Completion Date for the designated area is_ April 3, 2009 which is also the date of commencement of all
warranties and guarantees required by the Contract Document.
The Contractor has complied with all the requirements of Substantial Completion, as stated in the GENERAL CONDITIONS of
the specifications for this Project.
`�
use,AIA, EED v.2AP Architect C. DAITE
rei Archre
The Contractor accepts this Certificate of Substantial Completion and agrees to complete or correct the Work on the list of items
appended hereto within 0 calendar days from the Date of Substantial Completion,thereby making Completion of Work on the list
by 0.
CONTRACTOR BY DATE
The Owner accepts the Project or Designated Area thereof as substantially complete and will assume full possession thereof on
April 6,2009.
SIGNATURE DATE
The responsibility of the Owner and the Contractor for maintenance, heat, and utilities shall be as set forth on the attachments.
Owner maintenance is only assumed upon completion and submittal of approved manufacturer's O&M Manual. (NOTE.
Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.)
ATTACHMENTS(Describe): NONE
• JOS � - I I / N G� 1 L
S
I
WASHINGTON, U S A
Community & Economic Development Department
April 2, 2009
Jim Mahlum
Project Manager
Public Works and Utilities Department
City of Port Angeles
321 E.Fifth St.
Port Angeles, WA 98362
Subject: Gateway Project—Bright/Krei Letter Dated March 30,2009
1 •
Dear Mr Mahlum.
I am directing this letter to you as applicant and project manager of the Gateway project. Glenn
Cutler, Director of Public Works and Utilities, provided me with the above mentioned letter The
March 30"'letter was not responsive to those concerns identified by Zenovic and Associates'
letters dated February 18, 2009 February 26,2009, and March 9,2009 Most importantly this
office has not receiveddocumentation that the proposed.fx complies with Section 117 of ACI
318-62 In addition to the letters mentioned above,please find attached a confirming letter from
Zenovic and Associates dated April 1,2009 Bright's assertions that,his calculations and design
drawings for the repair demonstrate a"satisfactory fix,"and that in his opinion a simple repair of
the spall is"sound"do not meet the requirement for showing actual compliance with the code.
Finally, I would like to reiterate an.issue I communicated at a meeting held on October 9,2008
and on multiple occasions since that meeting. If you question the qualifications or credentials of
the Building Official's contracted engineer(Zenovic and Associates),I am willing to hire an
additional structural engineer to continue with building code review on these remaining items of
concern. To date,you have advised that you.do not wish to proceed in this manner
I look forward to your response.
Sincerely,
athan A. West,AICP
Director of Community and Economic Development
CC. Glenn Cutler Director of Public Works and Utilities,City of Port Angeles
Kent Myers,City Manager City of Port Angeles
Im k
n tj ryy�
1
4 hone 360-41 / 47507 4711
Vill RAN
4j.M R
-
301 East 6th Street,Suite I
& ASSOCIATES Port Angeles,Washingtori 98362
1 N C 0 R P 0 R A T E D (360)417-0501
Fax(360)417-0514
April 1, 2009 E-mail:zeiiovic@61ympLis.net
Mr Jim Lierly
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly-
I have reviewed the letter dated March 30 2009 from Ade Bright to Parametrix. This
letter does not address the items in the letter dated March 25, 2009 from Terry Weed.of
Clallam Transit to Jim Dugan of Parametrix which also relates to my Item #1 of my letter
dated March 19 2009 It should be noted that from a review standpoint, this office is.
obligated to review the proposed repair plan and,calculations for conformance with
applicable codes.
In regards to Item A,this office has not seen revised calculations for the current design
which uses #5 dowels rather than the#6 dowels shown in the original set of calculations.
These must be submitted for review and approval of the current proposed repair plan I
have dated March 6, 2009 It should be noted that the March 6th plan I have from Bright
Engineering does not specify spacing and edge distances for the dowels on the plan
which will be required to provide a complete review
In regards to Item B no calculations have been submitted for review regarding this
issue.
In regards to Item C revised calculations or documentation from Hilti, the manufacturer
of the specified epoxy, shall be provided to show that the dowel embedment depth,
where installed in the area of the spall have sufficient embedment depth to develop the
yield strength of the reinforcing bars on each side of shear plane as required by ACI 318
Issues related to Items D, E, and F are not being addressed by this office at this time
Please feel free to call if you have any questions regarding this matter
Sincerely,
>�1i J D�
f�1AS NC
Tracy Gudgel, P E.
Fc- JN 08091
V
-P-right E—ngmeering Inc Consulting Structural and Civil Engineering
March 30 2009 BEI# 116 03R
Parametrix,Inc.
Attn. Stan Cruse,Project Manager
2102.N.Pearl Street, Suite 301
Tacoma,WA 98406
RE. PORT ANGELES INTERNATIONAL GATEWAY
Second Response—Repair Comments Forwarded by Terry Weed of Clallum Transit System
Dear Stan.
Items A,B & C
We have responded to those comments in our letter dated March 18,2009 as well as in our letter related to
occupancy dated March 24, 2009 We have provided calculations and design drawings for the repair which
demonstrate a satisfactory fix.
Please note that the facing wall under question is not required as we have stated all along. The facing wall
was hesitantly included in order to pacify those concerned with"catastrophic"collapse of the structure In
our opinion, a simple repair of the spall is sound.
Again,the facing wall was designed to be a `belt and suspender' support in the highly unlikely event PB3
loses complete support from the exterior wall. This design and calculation was reviewed by ABAM and
found'acceptable. Even if Zenovic and Associates disagrees with our design or cannot follow our
calculation,the second paragraph of ABAM's letter dated February 24 2009, explains the loading
mechanism of the facing wall for a non-technical person. ABAM suggested a minor revision to our detail,
which again has been incorporated into our revised drawing, and yet Zenovic and Associates continues to
question the design.
Item D
We will provide formal specifications as to how much concrete should be removed once we clear the
huddle of the facing wall However specific surface preparation shall meet the requirements of the product
manufacturer Our professional liability does not cover product design or warrantee products.
Item E.
We will provide formal pipe encasement details when facing wall issue is resolved.
Item F
Direction to epoxy injection has been previously provided.
cq 7` A S to iioo SE /g g8101 Pl o ub 625 ,711 ob.b 1651 1 n(o c7i <ng.
Stan Cruse
January 15 2009
Paget of 2
Once again, the continued trivial comments and editorials by Zenovic and Associates are unprofessional and
are causing unnecessary delay and cost to this project. As the Structural Engineer of Record, I question the
professional qualifications of Zenovic and Associates in reviewing a structure of this complexity They have
thus far disregarded the opinion of a number of reputable Structural Engineers. Since we,-and not Zenovic
and Associates,are professionally liable for the performance of this structure, we stand by our design
regardless of Zenovic and.Associates speculative opinion.
Please call me if you have any questions.
Regards,
O� WAA,gxl���
Ade J Bright, PE, SE {V �, ��✓�
J
O�,G 813
S nALE�
S IVAL ���
'/0�0 sum ,
i ��''S�'y_f...i- J�I: S� ,• •'i!i.;i '\x'L:. }Tf�,Cu. .�^ i.., J,.t. —•ter SSN!% `��
<s.• YY.� 'li ..Mgi •\ti a'�.'i�r4:6 t J'� .ti9: f:-.,�nl..,`F'."r . PYX:,. ). •L��'
� L' r. i a1. 7 a.t. S. •� t'fy i •{t
}"i•Y
y. .�µji:.�,�;v• r.i,aa:•};y e• •irrv';';,._4" t:_•. i
�;t.i Gi 2• v ^_/xlc,- rc.�l ;T�. li�({ d'I,`H- �.�
tS R i 141 '�:A !1C" I. '..w..'.x %\ J!r'
:i!.; :#+>' ' . .;.i>, •�:i?,: !1 rV' :',,. .x�y' 1,.k.. y'!. !' rF ;t" 1�
�! 5 11'7r'. c•f: .�. s. .F.`ri, r.l�'Z.S`. J�'r;:�TV'r'{i'."e 7+ S' }', •.s .•Y 1. .rJ+.;
� .vt'"tt'h r^T�• k "rC�• :J_: .'.,- :�''•ri^".'St y>r: t >< .I.�u.��•� -.;R1 .1h•. .til
_ .. .�:�„' yam.,.. _� •.�eF -i 'b' .ts t
4a;'.f''Y�y.. -}Yii,.--a+�;,yr^• s.}.'1'e+. _1 _ .d,Y t' J R
ti; .,;j!- t. t•.i•.•. •,iLc.� `'.'•'�'.•`.•r'_. ..f'.�
is I; 7; s'" k"ti±$Yv.•'C �Ijr .i... .f• .,ti, >s !i 1. .
301 East 6th Street,Suite 1
&
ASSOCIATES Port Angeles,Washington 98362
INCORPORATED
(360)417-0501
March 9,2009 Fax(360)417-0514
Mr Jim Uedy E-mail:zenovic@olympus.net
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles,WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Liedy
As a follow up to my March 26,2009 letter the specific code sections that must be addressed in the
calculations or documentation by the design engineer to allow approval of the proposed repair of the spalled
area at P13-3 are as follows:
1 ACI 318-05,Section 117—Design for Shear-Friction(see requirements of this entire section)
Existing spalled area to be reinforced to comply with this section.
2. ACI 318-05,Appendix D—Anchoring to Concrete—epoxy anchorage shall comply with this section
and the appropriate ICC Evaluation report for the product specified. Please note that 1-1111111HY 150
does not comply with the requirements of 2006 IBC.
Please feel free to call if you have any questions regarding this matter
Sincerely,
Tracy Oudgel,P.E. Q tiG�
Fc: JN 08091
�o4wIPA Nr�ye�y
n
�ss1oN�-
.4-_-& �[ �- `—`—�_��~ '��o�\ 4�0
.01
A P5
]0l�on�63�co Suite|
ASSOCIATES yxoA-rigJu'Wa,kiogmuY8962
/ mcoarouxTso CITY OF PORT ANGELES
Dept.of Community DevOlopment 1 (360)417-0501
February 28. 2UOQ Fax(36N4|7-05)4
Mr Jim Liedy E-mail:zeoov,c@h|ympuouo
City ofPort Angeles Department of Community Development
321 EmstFifth Street
Port Angeles,VVAQ83O2
SUBJECT Port Angeles International Gateway
Dear Mr Liedy-
Thiooffioohounovimxwedthe|eUerdated2/2400fromRobertK8motconoemingthepropooadopaUnepoir
under PB-3dated proposed byBright Engineering, Inc(2/100Q). Subsequently |discussed the letter with
Mr Mast and reviewed the recommendation by Ingo Goller of Exeltech(2/25/09)and a response from Stan
Cruse ofPmrmmethx(2/350Q).
Based on this review mycomments are:
ThopnopnaedaddiUonofUeoacnoumthe^b|onKameowmu|dhe|paddronothaohearhicUohioouem
noted in my review letter regarding this fix by reinforcing the proposed grout repair |tshould benoted
that per AC|318the shear fhoUonloads should have been addressed inthe ohginn|design;/Nr �/NmsL
ooncusv�thmyassessment. Therefore these proposed additional ties should bodesigned tomeet the
required shear friction load determined by calculation to account for temperature,shrinkage forces and
elastic shortening. These ties should be designed to develop the specified yield strength as noted in
item#Qofmyletter nf2/18/OQ |tmay bepossible buuse smaller ties ourecommended byMr Mast and
use epoxy anchorage.
If the epoxy anchorage system cannot develop the yield strength to conform to requirements of ACI 318
as noted in item#4 of my letter then the ties should extend through the wall to comply with this
requirement. |tshould benoted that inmyconversation with K8r Mast hestated that harecommended
to Mr Bright that anchorage be extended through the wall to the back side. If this is not feasible it would
seem that Ingo's recommendation to fill the entire area with concrete rather than using a grout repair
and concrete might bomore appropriate. Closed ties could baincorporated nothat the concrete inthe
spalled area would at least be integral with the new concrete wall and therefore create a mechanism to.
resist shear friction forces with the proposed ties into the existing wall.
|twould seem that the bearing pad ionot necessary* K8r Mast concurs with this assessment.
BiminaUngthebeahngpmdandpouhngonugogminstthebottomofthoboamwmu|dminimiaethe
chance ofavoid. Proper consolidation and extending the new wall above the soffit ofthe beam to
create hydraulic pressure would further reduce this possibility |twould seem appropriate bolet the
patch help carry the load since a failure in the existing wall and settlement onto the repair wall would
create possible differential settlement issues with post tensioned beams being sensitive to differential
settlement.
Removal ofthe W dowels into the bottom ofthe beam iuappropriate and might actually eliminate
additional concerns.
The design ineer should provide a revised design complying with the recommendations of Mast's letter
and the Code requirements noted above and the design should including use of the proper epoxy meeting
requirements of ACI 318 with calculations complying with ACI 3180-5, including group action factor
requirements. It is worth noting that this lack of shear friction reinforcement design discussed above is
present under all the post tensioned beams in the structure although at this time no failures have surfaced
except atP8-3.
Sincerely
7W
Tracy 8udge. P.E.
Fc: JN 08091
301 East 6th Street,Suite I
& ASSOCIATES
Fax(360)417-0514
February 18, 2009 E-mail:zeiiovic@olympus.net
Mr JimLierh
Building Inspector
City ofPort Angeles Department mfCommunity Development
321 East Fifth Street
Port Angeles, WA 98362 18 2
SUBJECT Port Angeles International Gateway ELB
CITY OF PORT ANGIELES
Dear Mr Liady' BUILDING mv/u/uw
This office has reviewed the proposed repair plan and calculations of the concrete spall under
P8-3dated February 1O 2OOBfrom Bright Engineering, Inc. Based onthe review vvefind the
proposed repair unacceptable with a number of issues that must be addressed. Following ioa
summary ofthe issues noted inmynavievv'
1 The shear friction reinforcing is not placed in the area requiring shear friction
reinforcing per ACI 318 Shear friction reinforcing iotypically placed to reinforce the
assumed theoretical 20 degree failure plane under a concentrated load (i.e. the area
ofthe spall) The reinforcing shown onthe plan ioplaced below this area and the new
mmU would be acting as o cantilever to resist the shear friction forces. Without the
shear reinforcing ocn000 the failure plane, the failure plane crack may re-occur otthe
same location with the anchored vvaU cantilevering to resist the new wedge sliding into
the boundary between the new and existing concrete. The top anchors inthe
, )
proposed design would tend to see much more tension due to the cantilever effectson
'-~
the wall and their proximity to the possible omounlmd failure wedge.
2. /\C| 31Grequires that 'shear friction reinforcement shall baappropriately placed along
the shear plane and shall be.anchored to develop the specified yield strength on both
sides byembedment, hooks, orwelding tospecial devices The proposed epoxy
anchorage system does not develop the yieldstrength ofthe reinforcing bars
specified. |twould appear that the only method todevelop the yield strength mfthe
reinforcing would betoextend anchors through the wall tosomething behind the wall
For clarification, the length of the hook in the new wall shall be specified in the plans to
show that itdevelops the yield strength
3. The shear friction design-force should also include a tension force from the beam as
indicated inACI 318 The force would beatleast the effects ofthe continued creep
(from over 78Dkips ofpost tensioning)and shrinkage ofthe beam plus temperature
shortening aowell aoaportion ofthe vertical load. The support wall with the epmUing
not only has unintended partial base fixity but the adjacent 45 degree wall creates high
restraint against the wall moving with the shortening mfthe beam |twould seem that
the minimum applied horizontal tension value used in the shear friction design may be
much higher than expected
4 The Hi}UHIT 15Oepoxy does not meet the requirements mfACI 318 Hi|tiHIT-RE 5OD-
GOepoxy does meet ACI 318requirements but its capacity would not appear to
develop the tension capacity of the#6 rebar with specified bond strength considering
phi factors Calculations complying withthorequinomentoofAC| 318 (see AC308for
post installed anchors referenced in ACI 318)shall be provided for review
Calculations shall include conditions of both cracked and uncracked concrete Also
aureferenced initem #2above shear friction reinforcing need tofully develop for the
yield stress ofthe reinforcing bar
Page 2
Port Angeles International Gateway
February 18 2009
5 With the flexible bearing pad under the beam which does not have the rigidity of
1 concrete, it is difficult to imagine that the total vertical load of the beam will be
transferred through the bearing pad into the new wall even through beam rotation,
unless there is a failure in the existing wall or end of the beam which would lead to
other complications That said, if the load does transfer into the new wall it would
seem that the load may overstress the pile cap and also induce a moment into the pile
with this loading and they should be analyzed for this loading.
Based on my review and as noted above there are a number of design issues, including possible
improper design for the shear friction forces, which need to be addressed prior to approval of the
spalling/delamination repair under P133. As was noted in my previous letter it is also my
recommendation that Robert Mast be involved in the review of the proposed repair not only
because he is one of the fore-fathers in the concept of shear-friction but also because he gave
recommendations as to the.proposed repairs including a design which takes into account shear
friction.
Please call me if you have any questions on this matter
Sincerely ti
U
Tracy Gudgel, P.E.
Fc: JN 08091
From BEI 206 625 1851 04/01/2009 14 59 #055 P 001/001
1„
BEAGERJABAW ENGINEERS INC PLANNING
37901 Nlnth Avenue soutfi 6ulte 300 ENGINEERING
Federal Way Mleehlept0n 98003.2600 BERGER/AB" E N V I R O N M ENTAL
2061431 7300 FAX 2061431 2230 E N •G I N E E R S I N C PROGRAM MANAGEMENT
+rerr.eb�m.eam
24 February 2009 0
Mr Craig Miller,Attorney
711 East Front Street,Suite A
Port Angeles, WA 98362
Re, Port Angeles International Gatew;j Spall Repair
BERGER/ABAM job No FABLD-09-115
Dear Craig:
I have read the Bright Engineering letter of 10 February 2009 and the Zenovic&Associates
letter of 18 February 2009 I understand the positions expressed in each letter
There is a simple and direct way to think of how the repair works. The repair is a new 12-inch }
wall that could provide support for PB-3 in the highly unlikely event that it would be needed.
Because the "new wall" is not directly supported by the piles,the load would need to be
transferred to the existing wall by shear friction. The eccentricity of the load to the plane of the
shear friction is only 3 inches,not unlike the eccentricity of slab c mpressive forces in a
composite T-beam in flexure.
The gross area of the shear plane is about 7.5 by 8 feet, or 8,640 square inches. The nominal
shear stress un,for a 361 kip factored load and a�of 0.75,is 56 psi This is extremely low
According to 17.5.3:2 of the ACI 318 code, only minimum ties(50 psi x area) would be required.
This amounts to 432 kips of nominal tension force in the ties. At 60 ks� this is 7.2 square inches
of steel in the 41 ties shown in the repair drawing, or 0 18 square inch per tie.
The purpose of the ties is to stitch the old and new walls together Because of this, I prefer to
extend the distribution of ties across the 'blank' area below the beam, even if they are not
counted as part of the tie reinforcement because of insufficient anchorage in the area of the
spall. The size of the ties could be reduced to 95,or possibly#4. I see no need for the 3/4-inch
dowels drilled into the beam, and I suggest their deletion.
In summary it would be appropriate to approve the proposed repair with the suggested change.,
Sincerer
Robert F blast,PE,SE
Senior Principal
'CIVIL ENGINEERING
IAN!)SUVEYING
301 East 6th Street,Suite 1
& ASSOCIATES Port Angeles,Washmgton 98362
INCORPORATED (360)417-0501
Fax(360)417-0514
April 1 2009 E-mail:zenovic@olympus.net
Mr Jim Lierly
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
I have reviewed the letter dated March 30 2009 from Ade Bright to Parametrix. This
letter does not address the items in the letter dated March 25 2009 from Terry Weed of
Clallam Transit to Jim Dugan of Parametrix which also relates to my Item #1 of my letter
dated March 19 2009 It should be noted that from a review standpoint, this office is
obligated to review the proposed repair plan and calculations for conformance with
applicable codes.
In regards to Item A, this office has not seen revised calculations for the current design
which uses#5 dowels rather than the#6 dowels shown in the original set of calculations.
These must be submitted for review and approval of the current proposed repair plan I
have dated March 6 2009 It should be noted that the March 6`h plan I have from Bright
Engineering does not specify spacing and edge distances for the dowels on the plan
which will be required to provide a complete review
In regards to Item B no calculations have been submitted for review regarding this
issue
In regards to Item C revised calculations or documentation from Hilti the manufacturer
of the specified epoxy, shall be provided to show that the dowel embedment depth,
where installed in the area of the spall, have sufficient embedment depth to develop the
yield strength of the reinforcing bars on each side of shear plane as required by ACI 318.
Issues related to Items D E, and F are not being addressed by this office at this time.
Please feel free to call if you have any questions regarding this matter
Sincerely I
��i Ibcf
Tracy Gudgel P E. coy
Fc: JN 08091
Page 1 of 10
Internet Message Novell.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan, Ingo Goller
Cc: Jim Mahlum, sandieb@ctatlamtransit.com, Terry Weed[tweed@c[a[lamtransit.com] Diane Lenius,
Bill Alton, Lindsay Murray- Roger Horton, Tom Ellis
Date• 03/31/2009 09.18:09 AM
Subject: RE. Gateway Substantial Completion by Krei
le TEXT htm
L7 .Ingo
I am not aware that any punch lists were done on the Pavilion and Clock Tower by Lindberg Et Smith and their
consultants (Structural, Mechanical, Et Electrical) and that we have not performed any punch list of the plaza,
bridge and landscaping.
The only areas addressed were the Transit building, perimeter sidewalks and Transit Mall.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710.6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From Ingo Goller [mailto•igoller@xltech.com]
Sent. Tuesday March 31 2009 9-10 AM
To- James Dugan
Cc: Stan Cruse Diane Lenius, Terry Weed [tweed@clatlamtransit.com] sandieb@claltamtransit.com, Jim Mahlum
[Jmahlum@cityofpa.us] Roger Horton Bill Alton, Tom Ellis; Lindsay Murray
Subject: RE. Gateway Substantial Completion by Krei
Jim;
Hard to believe that I was able to confuse you, sorry about that.
My contacting you was as a result of discussion with Terry Weed who indicated that Krei was the responsible entity to
handle the substantial completion process. Your e-mail clarifying the role that Krei would provide a 'final punch list
to make sure all work was accomplished in conformance to the contract specifications and that the construction
management team would then affirm that all work on the punch list has been done is what then prompted me to
advise you that that had been done The final punch list walk through took place on November 26, 2008. All items on
the punch list provided by the A/E team have been completed, either corrective work, completion of work, or
appropriate certification from responsible jurisdictions.
If there is any compelling reason to have another punch list walk through, it can be arranged. But as I explained in
my previous e-mail, since last November 26, the only item not actually seen by the A/E team was the topping slab on
the plaza that was installed in early to mid February A copy of the completed punch list can be provided.
Ingo Goller
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<maitto:igoller@xltech com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World'People Not Companies, Deliver Projects
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 2 of 10
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall not
be responsible for any losses, claims or liabilities associated with the unauthorized use interpretation or
modification of the files of text.
From* James Dugan [JDugan@parametrix.com]
Sent: Monday March 30 2009 9.34 PM
To: Ingo Goiter
Cc: Stan Cruse Diane Lenius
Subject. RE. Gateway Substantial Completion by Krei
Ingo I am confused. Are you or are you not asking for a final punchlist?We previously inspected the Transit Bldg and
the sidewalks but not the rest of the project. Your phone call (and email) requested an inspection of the rest of the
project. Your email below says A site visit therefore to do a final punch list walk through is not necessary
Please clarify
Thx.
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253.278.8105
idugan@parametrix.com
From- Ingo Goiter [mailto igoller@xltech.com]
Sent. Monday March 30 2009 3 58 PM
To James Dugan
Cc: Terry Weed [tweed@clal[amtransit.com] sandieb@ctattamtransit.com, Jim Mahlum [Jmahlum@cityofpa.us]
Roger Horton, Bill Alton, Tom Ellis, Lindsay Murray- Diane Lenius, Tom De Laat
Subject: RE. Gateway Substantial Completion by Krei
Jim,
The final punch list was developed 11/26/08 by-
Stan Cruse Krei Architecture
Robert Kugen Parametrix
Susan Smith Tres West
Jason Bordash Tres West
The individuals below also added items to the punch list.
Tom Ellis Exeltech
Sandie Barnhart Ctallam Transit
Kevin Gallacci Clallam Transit
Jim Lierly COPA Building
Robert Vess COPA Public Works
All items on the combined punch list except the refreshing of the pavement markings and completing the insulation
under the transit building have been completed or accepted by the appropriate authority Work completed by
November 26 2008, included all base bid work except for the topping slab on the plaza, additive B, Pavilion and
additive C, clock tower The topping slab has been installed and all punch list work except for the two items
mentioned above is now completed A site visit therefore to do a final punch list walk through is not necessary
Ingo Goiter
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 3 of 10
Port Angeles, WA 98362
igoller@xltech com<mailto igoller@xltech.com>
Ph: 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World*People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall not
be responsible for any losses, claims or liabilities associated with the unauthorized use interpretation or
modification of the files of text.
From: James Dugan [JDugan@parametrix.com]
Sent: Monday March 30 2009 1 32 PM
To Ingo Goiter
Cc: Terry Weed [tweed@clallamtransit.com] sandieb@claltamtransit.com, Jim Mahlum [Jmahlum@cityofpa.us]
Roger Horton, Bill Alton Tom Ellis; Lindsay Murray Diane Lenius, Tom De Laat
Subject: RE. Gateway Substantial Completion by Krei
Ingo Thank you for the email follow-up to your phone call. For clarification purposes only Substantial Completion is
not done by Krei
Krei Architecture has a part of the overall Substantial Completion process of steps. We final inspect and provide a
punchlist. Primo does the work necessary to satisfy the completion of the items on the punchlist. Exceltech verifies
the work is done There are a number of additional items for Exceltech to verify are done in addition to the
punchlist inspection work by Krei Architecture to satisfy all the requirements of the contract for issuance of a Letter
of Substantial Completion Receipt of OEtMs and Owner Training are a couple of those items. When all of the above is
done and Exceltech verifies that it is done we (Arch of Record)will issue a Letter of Substantial Completion. Sample
attached.
We previously completed the final inspection of the Transit Bldg and the perimeter exterior sidewalks and submitted
the resultant punchlist to you for administration. Please confirm. Our understanding for this current request is this is
for inspection of the remainder of the project which will also result in a punchlist for your administration. Please
confirm.
I will advise the team accordingly of your request for final inspection. I will not know the date for inspection until
they respond with their availability I would be remiss to guess in advance of that feedback. I am certain that Stan
and I cannot this week.
I will contact you as soon as I know more
Thx.
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253.278.8105
jdugan@parametrix.com
From Ingo Goiter [mailto•igoller@xltech.com]
Sent: Monday March 30, 2009 12:08 PM
To: James Dugan
Cc: Terry Weed [tweed@clallamtransit.com] sandieb@c[allamtransit.com Jim Mahlum [Jmahlum@cityofpa.us]
Roger Horton, Bill Alton, Tom Ellis, Lindsay Murray
Subject: Gateway Substantial Completion by Krei
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 4 of 10
Jim,
As we discussed in our phone conversation this morning, COPA and the ClaRam Transit System folks are ready proceed
with the acceptance for the transit facilities. Please arrange for processing the substantial completion for the
facilities at your earliest convenience We are available any day this week.
Ingo Goller
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto:igotter@xttech.com>
Ph. 360 417 3803
Fax: 360.417 3097
Sustainable Engineering Solutions for a Changing World`People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any purpose without authorization is strictly prohibited Exeltech Consulting, Inc. shall not
be responsible for any losses, claims or liabilities associated with the unauthorized use interpretation or
modification of the files of text.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
CITY OF PORT ANGELES
321 E 5TH STREET
P 0 BOX 1150
PORT ANGELES WA 98362
s
C E R T I F I C A T E O F O C C U P A N C Y
T E M P O R A R Y
Issue Date 3/30/09
Expiration Date 5/29/09
Parcel Number 06-30-00-5-0-0043-0000-
Proper-ty Address 123 E FRONT ST
PORT ANGELES WA 98362
Subdivision Name
Legal Description TIDELANDS N210 OF W2 LT4 BL 1
SUR V40 P40
Property Zoning CENTRAL .BUSINESS DISTRICT
Owner Clallam Transit System
Contractor PRIMO CONSTRUCTION INC
360 683-5447
Application number 06-00001042 000 000
Description of Work COMM NEW CONST
Construction type
Occupancy type
Flood Zone
Special conditions
March 30, 2009 12 13 52 PM 1pangrle
This Gateway Project Temporary Certificate of Occupancy
is limited to only those areas accessed on the west side of
the transit building Fencing shall be maintained in
accordance with the March 27, 2009 memo from the Director of
Public Works and Utilities
The east parking garage is excluded from occupancy at
this time
All outstanding issues are to be addressed within 60
days (May 29, 2009)
A zoning lot covenant for the entire site must be filed
prior to issuance of the final Certificate of Occupancy
See the attached March 30, 2009 letter from Nathan West
to Jim Mahlum for more details
D
Approved c0(NY`���,- � , Permit Te-66tctcAh ,
Building Official 5i Jn�fO� s h 6e h,l f
VOID UNLESS SIGNED BY BUILDING OFFICIAL N-k*u.h n Wes+
4'ORT NGELES
WASHINGTON U SA
Community & Economic Development Department
March 30, 2009
Jim Mahlurn
4A Project Manager
Public Works and Utilities Department
City of Port Angeles
321 E. Fifth St.
Port Angeles, WA 98362
Subject: Gateway Project—Transit Buildine Temporary.Certificate of Occupancy
123 E.Front Street—Buildinj!Permit 06-1042
Dear Mr Mahlum.
This letter will serve as-notice that temporary occupancX of the Gateway Project Transit Building
is hereby given. Temporary occupancy is granted as of this date based on the information
provided in the March 27 2009 memo from the Director of Public Works and Utilities. At this
time, occupancy is limited to those areas accessed on the west side of the building. Fencing shall
be maintained in.accordance with the March 27th
diagram of the above.mentioned memo
Temporary occupancy is granted with the understanding that all outstanding issues will be
addressed within 60 days (May 29 2009) Those issues have been identified in correspondence
dated February 18, 2009,February 26, 2009 and March 9,2009 You are further reminded,that a
zoning lot covenant for the entire site must be filed prior to Certificate of Occupancy.
In addition to those items noted above, one ofthe areas excluded from occupancy(the east
parking garage)results in-restrictionof multiple parking spaces and parking requirements not
met. Should concerns be raised regarding those requirements during the period of temporary
occupancy,mitigation may be required, or the temporary occupancy may be revoked.
Upon satisfaction of the remaining items you will be required to request all necessary.inspections
�k to ensure the entire facility satisfies occupancy code requirements. If you have any questions,
please do not hesitate to contact me
Sincerely
'y
Nathan A. West, AICP
Director of Community and Economic Development
CC Glenn Cutler Director of Public Works and Utilities,City of Port Angeles
Kent Myers,City Manager City of Port Angeles
lM
Phone 360-417-4750/Fax -,60-417-4711
Website wwwcityofpa.us/ Email smartgroVhdcityofpa.us
rig 4'� 321 East Fifth Street P 0 Box 1150/ Port Angele!. WA 98362-0217
6-Pri,94 E—ngineering Inc Consulting Structural and Civil Engineering
March 30,2009 BEI# 116 03R
Parametrix,Inc.
Attn. Stan Cruse,Project Manager
2102,N.Pearl Street, Suite 301
Tacoma,WA 98406
RE. PORT ANGELES INTERNATIONAL GATEWAY
Second Response—Repair Comments Forwarded by Terry Weed of Clallum Transit System
Dear Stan.
Items A,B& C
We have responded to those comments in our letter dated March 18, 2009 as well as in our letter related to
occupancy dated March 24 2009 We have provided calculations and design drawings for the repair which
demonstrate a satisfactory fix.
Please note that the facing wall under question is not required as we have stated all along. The facing wall
was hesitantly included in order to pacify those concerned with"catastrophic collapse of the structure. In
our opinion, a simple repair of the spall is sound.
Again,the facing wall was designed to be a"belt and suspender"support in the highly unlikely event PB3
loses complete support from the exterior wall. This design and calculation was reviewed by ABAM and
found'acceptable Even if Zenovic and Associates disagrees with our design or cannot follow our
calculation,the second paragraph of ABAM's letter dated February 24 2009 explains the loading
mechanism of the facing wall for a non-technical person. ABAM suggested a minor revision to our detail,
which again has been incorporated into our revised drawing, and yet Zenovic and Associates continues to
question the design.
Item D
We will provide formal specifications as to how much concrete should be removed once we clear the
huddle of the facing wall. However specific surface preparation shall meet the requirements of the product
manufacturer Our professional liability.does not cover product design or warrantee products.
Item E.
We will provide formal pipe encasement details when facing wall issue is resolved.
Item F
Direction to epoxy infection has been previously provided.
1809 71' A, Suite IIOo S—We \YIA 98101-1381 I pho 2o6 6253777 1 fa 206.625 1851 1 nfo@6riekeng.
Stan Cruse
January 15 2009
Page 2 of 2
Once again,the continued trivial comments and editorials by Zenovic and Associates are unprofessional and
are causing unnecessary delay and cost to this project. As the Structural Engineer of Record, I question the
professional qualifications of Zenovic and Associates in reviewing a structure of this complexity They have
thus far disregarded the opinion of a number of reputable Structural Engineers. Since we, and not Zenovic
and Associates, are professionally liable for the performance of this structure,we stand by our design
regardless of Zenovic and Associates speculative opinion.
Please call me if you have any questions.
Regards,
NYA" 71
Ade J Bright,PE, SE 1 ,
813
`SAL
yo
Aye^S
lit
w
Date Topic To From Summary/Comments
1/26/2009 Gateway Project Krei's letter of response to delamination issue Nathan West Jim Mahlum Back and forth comments addressing comments to the cracking This memo asks for comments from
the _
1/27/2009 PAIG Nathan West, James Dugan Craig Miller Report attached in separate binder with calculations from the independent review done by Robert Mast
and
1/27/2009 Re: Mast Report-2nd draft Craig Miller Glenn Cutler Comments to the Mast Report including a response from Craig Miller that items on Page 6 may not be
appropriate for public release
will be
1/28/2009 Gateway Project-West Parking Garage Temporary C of O Jennifer Howell Primo Nathan West satisfactorily addressed within
30 days from the date of temp C of O (by Feb 28 2009)
1/29/2009 PAIG Jim Lierly Tracy Gudgel After review of Bob Mast's report and conversation it is opinion that the Stop work order can be lifted and
it is
1/29/2009 Removal of STOP WORK NOTICE PAIG Jim Mahlum Nathan West Lifting the stop work order placed on 11/21/08- no occupancy will be granted until the outstanding issues
discussed on 10/9/08 are resolved
issues
1/30/2009 PAIG Jim Lierly Tracy Gudgel still not addressed and some that need clarification-though does say that the independent report does
address issues that were never addressed by Ade Bright
2/3/2009 Record of Meeting with Bob Mast Stan Cruse Ade Bright Meeting with Bob Mast in regards to hi sindependent review and agreed to some items
2/3/2009 Nathan West Terry Weed Bob Mast's indpendent review is complete
2/18/2009 PAIG Jim Lierly 1Tracy Gudgel After reviewing the proposed repair plan and calculations find them unacceptable
2/26/2009 PAIG Jim Lierly Tracy Gudgel After reviewing letter concdrning the proposed repairs, design engineer should prepare revised design
complying to recommendations of Mast's letter
have
2/27/2009 Re Gateway Wall Repair Glenn Cutler Nathan West written statement for area that is planned to be occupied and an engineer stamped statement saying this
section
2/27/2009 RE. Gateway Project-West Parking Garage Temporary Occupancy Nathan West Jennifer Howell Inform that Primo has relocated exit signs done emergency lighting at stairway and delineated the
turnaround- _
3/5/2009 Pakring Lot Stall Dimensions for Gateway West Parking Garage Nathan West Glenn Cutler Recommended that parking plans for the garage as currently delineated be accepted as they meet the
_ intent of
3/10/2009 RE. Gateway-West Parking Garage 115E Front Street Jennifer Howell Sue Roberds Temporary C of O extended for 30 days- items 1 2 and 5 have been inspected- remaining items 3 and 4
Temporary Certificate of Occupancy Building Permit 07 742 will be _
Gudgel's
3/13/2009 Latest design of delamination repair Craig Miller Terry Weed Steve Sperr 3/9/09 letter-gives 3 issues that need to be addressed before they can approach the building official
with a design
3/18/2009 PAIG Response to Prepared Repair Comments Stan Cruse Ade Bright Responses to 2 items Zenovic has lack of regard for judgment of structural engineers involved with this
calculations
3/23/2009 Conversation with Bob Mast Glenn Cutler Craig Miller were adequate, but was no documentation to confirm that the embedment proposed was sufficient for
the#6 dowels
completed-
3/25/2009 PAIG Building Occupancy Jim Dugan Terry Weed understand frustration with the continued demand for information but feel that the most appropriate
action is
3/27/2009 Clallam County Transit Authority Zoning Lot Covenant Craig Miller Bill Bloor Sending another copy of the zoning lot covenant since Craig Miller did not receive the first one
3/27/2009 Temporary Occupancy for the Transit Building Nathan West Glenn Cutler Request temporary occupancy for 60 day period
3/30/2009 PAIG-Second Response- Repair Comments Forwarded by Terry Stan Cruse Ade Bright
Weed of Clallam Transit System Have responded with calculations- provides explanation to certain items
Gateway Project-Transit Building Temporary C of O Co be dealt
3/30/2009 123 E Front Street- Building Permit 06-1042 Jim Mahlum Nathan West with before May 29 2009 Temp C of O restricts much parking- if becomes problem additional mitigation
orCof0
Date Topic To From Summary/Comments
Principals meeting from 11/13/08 focused on resolving issue of completion of Plaza Deck, committed to
completeing research by the end of last week to ensure building offic Consultant would have material-
11/18/2008 Int'I Gateway Delamination Summary Letter James Dugan Jim Mahlum but has not happened Time is important and a meeting had to be put on hold because information was
not received-seek consideration from Bright Engineering concerning the provision of a method of
construction completion in a shorter time frame than outlined in last direction given financial impacts
are mounting
addressing final decisionfor each item-must comlete P63 Delamination repair before Plaza deck
11/17/2008 Follow up to 11/13/08 Principals meeting Multiple items Terry Weed Jim Dugan loading
monitoring fo the PT structure during Plaza Deck loading has been determined not necessary (other
items
11/18/2008 Summa Letter Jim Lierly Nathan West
Summary Tracy Gudgel Jim Mahlum was in email after meeeting
11/19/2008 PAIG Jim Lierly Tracy Gudgel Not all items from October letter have been addressed- have itemized those that have not been
requested
have still not been provided- monitorinig as was discussed in the 10/9/08 meeting must be incorporated
immediately to ensure no further delays-will also continue to make options available for removing stop
11/21/2008 STOP WORK NOTICE Jim Mahlum Nathan West work
order-due to continued review fees have gone beyond the review fees submitted with permit, additional
time
will be billed at cost occupancy of facility will not be permitted until City's Building Inspector approved
been
11/24/2008 Re Gateway Building Officials Comments & Stop Work Notice Jim Lierly Nathan West Glenn Cutler instructed that as per a phone conversation between Glenn and Diane Stan is not to have any
communication
11/26/2008 Gateway Project Delamination Fix Nathan West, Jim Lierly Jim Mahlum .Formal copies of the fixes for the Shoring design cack monitoring plan and calculations on how they
12/3/2008 Letter from 12/3/08 Tracy Gudgel Nathan West Please proceed with letter that was discussed yesterday
Work
COPA feedback received today Re. PB3/Wall conncection, shoring Order Gives background saying that all issues have been addressed and solutions have been submitted
12/2/2008 Design and monitoring plan-COPA BO did not approve Terry Weed James Dugan to
the building department the advice of the building dept. in September and the Structural Engineer of
record
from
the recommendations letter(11/19/08) not a fail safe shoring in case of structural failure during loading
of
the topping Islab- Proposed type and duration of monitoring have also changed and must be addressed -
12/8/2008 Response to November 26 2008 Gateway Project delamination fix Jim Mahlum Nathan West in review of the temp shoring plan by Bright Engineering a crack monitoring program must be approved,
some items may be overstressed esp with the uncentered load -proposed location for the shoring also
needs to be addressed provide calculations to show that with the negatvie movement the place will still
be
structurally sound-also address why a tight shoring system is proposed that does not allow movement at
he
12/11/2008 Tracey Gudgel Nathan West feels uncomfortable of his abilitiy to evaluate the matter based on his capabilities (qualifications,
resources etc. )to let him know immediately
12/12/2008 PAIG Project Nathan West Craig Miller Letter from lawyer for Clallam Transit System saying they are hiring an engineer for review and asking
the
12/17/2008 PAIG West parking garage Jim Lierly Jennifer Howell Folllow up letter to the 9/29/08 Zenovic letter with responses to the itemized concerns
12/18/2008 Gateway Project Delamination Fix Nathan West, Jim Lierly Jim Mahlum Attachments from Krei and letter from 11/18/08 which was a suggestion not a directive- please provide
answers by 12/23/08
Reviewed the 12/4/08 response letter from Poggemeyer responses are acceptable and adequately
12/19/2008 PAIG West Parking Garage Jim Lierly Tracy Gudgel address the issues. However item 2 concerning the cracking in the beam at the ends of the shear
wall calculations are requested to show that the beam is properly reinforced for the reduced shear load-
12/26/2008 PAIG Jim Lierly Tracy Gudgel Reviewed memo from 12/17/08 wanting clarifications from COPA- purpose of letter is to provide
clarifications _
1/26/2009 PAIL-West Parking Garage Jim Lierly Tracy Gudgel Zenovic has reviewed the 1/23/09 response letter from Poggemeyer and issues have been adequately
addressed and structure is safe to open
Date Topic JTo From Summary/Comments
10/9/2008 Outline to 10-9-08 Delamination Meeting Stan Cruse, Jim Mahlum Lindsay Murray Meeting Minutes from the 10-9-08 Delamination Meeting:
10/10/2008 Outline to 10-9-08 Delamination Meeting w/comments Stan Cruse, Nathan West Lindsay Murray
10/16/2008 RE. Gateway West Parking Garage Letter dated 10-2-08 Jim Lierly Jennifer Howell All correspondence needs to be through main office-also a letter from Poggameyer that addresses the
questions asked Your PE can refer to the book of calculations and plans submitted for permit
10/17/2008 Gateway Transit Center Punchlist Jim Lierly Ingo Goller Work progressed on Gateway to point that punchlists need to be developed want to do a walk through
to
10/17/2008 FW- Meeting -Owner/Architect/GC#66 Jim Lierly Katie Garcia
10/17/2008 Meeting -Owner/Architect/GC#67 Jim Lierly Katie Garcia
with each side (city and Bright Engineering) holding positions is best to bring in an independent 3rd party
10/20/2008 Gateway transp Center review of delamination/cracking docs Jim Mahlum Ingo Goller engineer to assess the cracking and conditons- regardless of 3rd party finding- BEI should be directed to
provide interim repair design- long term repair will be dependent on 3rd party
10/20/2008 City's review of the Draft Delamination Letter Jim.Mahlum Ingo Goller
10/27/2008 Meeting -Owner/Architect/GC#68 Jim Lierly Katie Garcia
the
10/28/2008 PA Gateway-West Parking Garage Jim Lierly Tracy Gudgel 9/22 letter was written prior to the 9/29!08 letter sent by Randy Gudgel needing more items addressed--
requests
10/28/2008 PA International Gateway- Response to Build Inspector and Stan Cruse Ade Bright Responses to Building Inspector's letter and meeting notes from 10/7/08- responses to concerns
Meeting Notes are given
10/29/2008 PA Int'I Gateway West Parking Garage Letter to Primo Jennifer Howell Jim Lierly Formally supports the 10/28/08 letter sent by Zenovic that informs Primo that the issues of Zenovic's
9/29/08
10/31/2008 Meeting -Owner/Architect/GC#69 Jim Lierly Katie Garcia
Stan Cruse Paul Brienen due to signif Loss in bearing from delamination of the wall can't determine if sufficient beam support
10/31/2008 RE. PA Int'I Gateway Plaza Deck Review (Krei Architecture c/o Parametrix) PCS Structural Solutions exists
at this location-no additional items that would prevent the immediate build out of the deck to commence
Whose evaluation indicates the deck is ready to load with some engineered shoring-asked by Krei to
11/3/2008 Gateway Project Krei's letter of response to delamination issue Nathan West Jim Mahlum forward
to DCED
he gave
Letter by PCS appears to be only cursory review and not considered to be an independent 3rd party
review does
11/6/2008 PA Int'I Gateway Jim Lierly Tracy Gudgel identify a discrepency between 50 psf PCS thinks is needed and the 150 psf figure used by Ade this
needs to
be addressed as to what affect this wiil have on the design -issues must be addressed prior to final
acceptance
11/7/2008 Fwd: scanned image from Nathan West, Jim Mahlum Jim Lierly Satisfied with letter from Tracy
Structural Calculations- Response to COPA Comments
Stan Cruse Paul Brienen acceptable-
11/11/2008 PA Int'l Gateway Plaza Deck review (Krei Architecture c/o Parametrix) PCS Structural Solutions recommend using 6 inch embedment where possible, additional embedment lengths may help reduce
potential
11/11/2008 Meeting Owner/Architect/GC#70 Jim Lierly Katie Garcia
11/11%2008 Thursday's progress meeting Ingo Goller Jennifer Howell Spoke with Jim-no need for Thurs meeting
11/11/2008 FW Thursday's progress meeting Roger Horton, Tom Ellis, Bill A Ingo Goller No meeting on Thurs- principals meeting still on
11/11/2008 Gateway Project Weekly Progress meeting Jim Lierly Lindsay Murray 11/13/08 meeting canceled
11/12/2008 PB 4 Cracking Ade Bright, Stan Cruse Ingo Goller Pictures showing cracking in P134 west of center beam (PB11) - More cracks visible now-w/o formal
crack
extraordinary costs are part of building permit fee as was necessaryfor department to independently
seek
11/12/2008 Engineering Fees Gateway Project Glenn Cutler Sue Roberds engineering consultation due to the engineer of record being unresponsive when asked for specific
information
needed to address engineering concerns. Costs may continue until resolution is reached or engineer
11/12/2008 PA Int'I Gateway Plaza Deck Response to Tracy Gudgel comments Stan Cruse Ade Bright
11/13/20081 Preliminary Punch List Roland Ordono Tom Ellis IA copy of the preliminary punch list for the Gateway Project
Date Topic To From Summary/Comments
9/18/2008 Gateway Sue Roberds Jim Lierly Summary of series of events
9/18/2008 Gateway Inspections Memo Nathan West Sue Roberds, Jim Lierly Memo of Jim Lierly's correspondence and inspections
9/19/2008 Plaza Loading Letter from Design Engineer Jim Lierly Glenn Cutler Ingo Goller Letter states the loading of the plaza deck should proceed to alleviate the distortion caused by the
post tension forces
9/19/2008 FWD- Plaza Loading Letter from Design Engineer Nathan West, Sue Roberd Jim Lierly
9/19/2008 Gateway Delay Ingo Goller Jennifer Howell Letter informing Clallam Transit that Primo is experiencing delays due to a sop work direction
unclear what the impact will be to schedule and cost
9/19/2008 RE. Plaza Loading - Letter from Design Engineer Jennifer Howell Ingo Goller Make sure to provide written notice once everyone has agreed that work can continue
9/19/2008 RE. Plaza Loading Letter from Design Engineer Glenn Cutler Jennifer Howell, Jim Lierly
Nathan West, Sue Roberds Currently in contact with engineer and will contact you as soon as is resolved-continue with no loading
9/19/2008 Gateway Plaza Glenn Cutler Jim Mahlum Jim Lierly
Nathan West, Sue Roberds Wanted more info on question if forms could be set on the deck of the plaza
9/19/2008 PAIG_Plaza Deck Jim Lierly Karen Fleming Explanation for spalling in the concrete-once fully loaded-this will not happen and then can repair
the spalling
Various Building Permit Application w/list of inspection dates Building Department
9/22/2008 FW- PAIG_Plaza Deck Tracy Gudgel Jim Lierly Wondering if letter is closer to what is needed
Follow up letter to others and meeting w/Cuttler Mahlum West& Roberds-need info from engineer
9/22/2008 Port Angeles International Gateway letter from Tracy Jim Lierly Tracy Gudgel before proceeding with load-also some explanations of cracks do not represent what he is seeing in
inspections
9/22/2008 FW- PAIG_Plaza Deck Jim Lierly Tracy Gudgel Called left message
9/22/2008 Work on PT deck Jim Mahlum Roland Ordono What Pimo needs to be able to do to continue working on the plaza deck
9/22/2008 RE. Work on PT deck Roland Ordono Jim Mahlum Primo is cleared to continue work on some items-hopefully by the time this work is done the other issues
will have been addressed and the pours will be approved
9/22/2008 RE. Work on PT deck Jim Mahlum, Ingo Goller Jennifer Howell Critical path continues to be affected, once issues are resolved will provide necessary info on $and time
9/22/2008 PA International Gateway west parking garage letter James Bartee Robert Bourdages Suggestions for repair of the wall cracks
9/22/2008 Gateway Project Jim Lierly Tracy Gudgel
9/23/2008 RE. Gateway Project Tracy Gudgel, Jim Lierly Stan Cruse Document not scanned fully need to have a Structural Engineer stasmp and pictures
9/23/2008 RE. Gateway Project Jim Lierly, Stan Cruse, Tracy Gudgel Jim Mahlum Didn't receive anything -will continue pushing with Glenn to get the full doc
9/23/2008 Letter Jim Mahlum Stan Cruse Email bounced back because of size limits-the reason it wasn't received
9/23/2008 Gateway Jim Lierly Tracy Gudgel Letter with the stamp on it includes pics and sketches with descriptions supporting issues in the letter
9/23/2008 RE. Gateway Tracy Gudgel, Jim Lierly Stan Cruse Mistake again with attachment-send other page
9/23/2008 RE. Gateway Jim Lierly, Stan Cruse, Tracy Gudgel Jim Mahlum Copy of 2nd page
9/23/2008 Fwd Gateway Nathan West, Sue Roberds Jim Lierly
9/23/2008 Record of Communication Jim Mahlum Jim Lierly Pat Bartholick Scheduled a meeting at Gateway after hearing there was more cracking-Took photos-Tom at Excel
commment was that he recommended not parking in either garage for 6 months-
9/25/2008 Short Duration Schedule James Bartee, Roland Ordona
9/29/2008 PA Int'I Gateway west parking garage Jim Lierly Tracy Gudgel Follow up to inspection performed on 9/23/08-additonal information will be needed beyond from the
letter from Tracy engineer beyond original requests to explain the new cracks that were found
9/30/2008 Gateway Meeting Minutes from 9/25/08 Jim Lierly Katie Garcia
9/30/2008 RE. PA Int'I Gateway Plaza Deck response to Tracy Stan Cruse Ade Bright Responses to Tracy's 9-22-08 letter provides reasoning for items-justifies any cracking or delamination
maintains adding the full load will prevent further cracking and can repair after that cracks are not
10/2/2008 Gateway Parking Garage (West) Primo Construction Jim Lierly After reviewing the report from Tracy parking layout doesn't meet requirements-
10/6/2008 Gatway status Glenn Cutler Jim Lierly Ingo Goller To make city aware that Primo is reduced to performing non-critical work and have reduced the number
of
10/3/2008 Continue Work on Gateway-PT Deck Jim Lierly Tracy Gudgel Reviewed response from Ade Bright-response does not provide adequate support still need more info-
shear-friction among some other issue may not have been addressed in design
10/6/2008 RE. Continue Work on Gateway PT Deck Ingo Goller Glenn Cutler no change in status-expecting a response this afternoon- Restriction is only placement of concrete on
deck
Terry Weed, Sandie Barnhart,
10/7/2008 FYl PAIG Meeting Confirmation - 10/9/08 @ 10am Exeltech Jim Lierly Glenn Cutler Nathan West, James Dugan
Jim Mahlum Stan Cruse Ade Bright,
Terry Gudgel, Ingo Goller Meeting to discuss issues related to the loading of the plaza deck
10/8/2008 Tomorrow's Meeting Regarding.Plaza Loading Jim Mahlum, Ingo Goller Stan Cruse Breakdown of the Zenovic document to facilitate-the meeting and address all issues item by item
Notes on Itemized Zenovic list Jim Lierly
Date Topic To From Summary/Comments
9/1/2006 Structural Calculations PA Int'I Gateway Transportation Center City of PA Krei Architecture
a parametrix co
12/6/2007 PA Int'I Gateway Bonded Beam Calculations City of PA Rick Fine, PE
3/3/2008 West Garage Pile Records Jim Lierly Denis Miller
3/3/2008 RE. West Grage Pile Records Denis Miller Jim Lierly
3/4/2008 Delaminated Concrete Primo Construction, Patsy Busby Ingo Goller
Jennifer Howell wanting a repair procedure for fixing delaminated concrete
3/5/2008 RE. Delaminated Concrete Ingo Goller Primo Patsy Busby Ade Bright
Jennifer Howell Questions about the delamination
3/4/2008 FW Delaminated Concrete Stan Cruse Robert Kugen, Ingo Goler
James Dugan
3/7/2008 FW* Delaminated Concrete Ade Bright, Ingo Goller Stan Cruse Happened when they stressed the beam
3/7/2008 Beam P3 Ade Bright Stan Cruse Photo indicates bearing area not width of wall
3/7/2008 RE. Beam P3 Ade Bright Stan Cruse
3/7/2008 RE. Beam P3 Stan Cruse Ade Bright picture shoes rebars cut
3/19/2008 Site Visit Report Prepared for KREI Prepared by Ade Bright Evaluate delamination of wall along grid B, directly below PB3 and PB5
Evaluate treatment of gap at expansion joint 8E between retaining wall and plaza wall
3/27/2008 Proposed Repairs Stan Cruse, Ingo Goller Ade Bright Based on discussions from 3/26/08, preliminary sketches for repair
5/7/2008 Review of 2nd floor PT tendons and reinforcing Present at Site Roland Ordona,
Robert Bourdages Observations and photos supporting 12 observations of deficiencies in the north pour
6/4/2008 Primo ready to cover HVAC duct work Stan Cruse, Robert Kugen Ing o Goller
James Dugan Primo ready to cover HVAC duct work and electrical rough in-designers perform inspection?
Ingo Goller Robert Kugen
6/4/2008 RE. Primo ready to cover James Dugan Susan Smith, Stan Cruse
Ed Horsman Is good idea for inspection, ask Susan to arrange site viist
6/4/2008 RE. Gateway M&E Walkthrough Stan Cruse Susan Smith HVAC and Plumbing looked fine saving a visit hoping contractor can help on mechanical
for electrical would like to plan a visit
6/4/2008 FW- PA Gateway M&E Walkthrough Ingo Goller Stan Cruse Respond to mechanical items and inform when covers scheduled
6/11/2008 FW PA Gateway M&E Walkthrough Jim Lierly Ingo Goller Report of M&E walkthrough, please review
6/26/2008 W G -Stairway& Railing Dwgs Jim Mahlum Ingo Goller Drawings not acceptable per Jim Lierly- provide revisions
7/8/2008 SW Plaza Stair Jim Lierly
7/24/2008 Sign Permit Application Building Department PA Gateway Permit#08-894
8/17/2008 GatewayEast Wall Delamination Ade Bright, Stan Cruse,
Robert Kugen, James Dugan Ingo Goller Delaminated area has expanded about 150% since 1st identified -site visit ASAP to review
8/18/2008 FW Gateway- East Wall Delamination Santosh Kuruvilla, Abdul Chahim Roger Horton Sent for review
8/25/2008 Sign Permit Application Building Department Clallam Transit system sign permit#08-1060
9/12/2008 Parking Lane Width Sue Roberds Mark Madsen Confirm phone conversation-did not and would not approve driving lane of 18'
9/4/2008 Site Visit Report Ingo Goller Stan Cruse Attaching site report Observations and recommendations for Beam PB3, PB4
9/8/2008 Correspondence regarding delaminated concrete Jim Lierly Ingo Goler
9/12/2008 Fwd Gateway Project Roland Ordona Jim Lierly requesting contact info for engineers responsible over issues, also documentation for parking
space issues and a request to be made aware of meetings in advance
9/12/2008 FW, Gateway Project(RE. Jim Lierly 9/12/08 email) Ingo Goller Roland Ordono Wondering if he should contact building dept. directly-also is it a stop work order?
9/12/2008 RE. Gateway Project Roland Ordono Ingo Goller DO NOT stop work-only wanting to keep Jim Lierly aware of ongoing developments
regarding delaminations
9/12/2008 RE. Gateway Project Jim Lierly Jim Mahlum Contact info for engineer of record, Abe Bright-also description on city staff meeting agreeing
on 20'wide parking lanes
Inspected delamamination and cracks in PB3- recommendation for no add'I weight added until
9/12/2008 PA Gateway- letter from Tracy Gudgel Jim Llerly Tracy Gudgel engineer has addressed this along with addressing vertical cracks and provide justification they
are weather related Repair work already permormed at east end should also be addressed
9/12/2008 Re Gateway Project Jim Mahlum Jim Lierly Spoke with Ingo and Roland-don't want any heavy equipment or concrete poured until review
is done
9/15/2008 PA International Gateway follow up letter Jim Lierly Tracy Gudgel clarification of 9/12/08 letter provide calculations and show is adequate before placing add'I load
also provide calculations with actual temps to justify cracks also calculations from repairs on a end _
9/17/2008 Memo on Inspection Sue Roberds Nathan West Work with Jim Lierly to provide memo for discussion with Glenn Cutler and Jerry Osterman-
Clallam 'Transit System (360)452 1315
830 W Lauridsen Blvd. 1-800-858-3747 WA
Port Angeles WA 98363 FAX(360)452 1316
www clallamtransit.com Passenger Assistance:
(360)452-4511
March 25 2009
Parametrix, Inc
Attn Jim Dugan
23102 North Pearl Street
Suite No 301
Tacoma Washington 98406
Re PORT ANGELES INTERNATIONAL GATEWAY
Building Occupancy
Dear Jim
The City of Port Angeles's building official has again .informed CTS that additional
documentation is necessary before he will approve proceeding with the delamination fix
which was recently proposed by Bright Engineering through Krei Architecture CTS has also
just been informed by the contractor that they intend to de-mobilize from the project site on
March 31
In order to expedite obtaining the building official's approval thus permitting directions to be
given to the contractor to do the fix before demobilization occurs we are requesting that the
information requested by the building official be provided within the time limits created by the
contractor's intent to demobilize CTS is well aware of the frustration which is being
experienced in responding to the building official's continued requests for information and
shares those frustrations However at this point, it seems most appropriate to provide the
requested information so that we can conclude the project.
Therefore please provide the following documentation which has been conveyed to us as
what is necessary for approval of the fix:
A Calculations demonstrating the adequacy of the revised epoxy dowel size (change
from #6 to # 5 bars) deletion of dowels between P133 and the new wall and
configuration The design has been changed but no revised calculations have been
provided The calculations should also show that the yield strength of the reinforcing
bars is developed on each side of the joint.
B Calculations demonstrating that the vertical load is effectively transferred across
the interface between the original wall and the concrete patch immediately under P83
The calculations should demonstrate that the shear friction forces are resisted by the
epoxy dowels in the area where the spalling under PB3 occurred
C Calculations demonstrating that the dowel embedment in the remaining wall depth
is sufficient to ensure that the strength of the dowel is developed Also identify the
depth of the dowel to be placed
D Direction on amount of concrete to remove around exposed reinforcing steel to re-
bond the reinforcing steel to the existing concrete wall This should not be left up to
the manufacturer to determine but it is the designer of record's responsibility to
identify
-more
CTS Letter to Parametrix, Inc. Page 2
March 25 2009
E - Direction on dealing with the drainpipe installed south of PB3 on the east wall
Provide a detail that shows how the dowels and horizontal reinforcing steel will be
adjusted to miss the drainpipe
F Direction as to the need to epoxy infect the through stem cracks in PB4 and P136
for long-term serviceability
Please be assured that, at some future date when the project is completed Clallam Transit
will be conducting a full analysis with our retained structural engineer to determine the
reasonableness of the building officials requests and his failure to allow the project to
proceed until his information requests have been answered without regard for whether his
requests involve critical issues
Thank you for your attention to this matter
Sincerely
Terry G Weed
General Manager
TGW meb
OF poRrgNC�
REQUEST FOR INFORMATION (RFI) FORM
PROJECT NAME. Port Angeles international Gateway
PROJECT/CONTRACT NUMBER. 97-20
ORIGINATOR: Primo Construction. Inc. ❑ Owner XX❑ Contractor
ITEM: Rigid Insulation
REFERENCE DRAWING OR SPECIFICATION:
DESCRIPTION OF CLARIFICATION/REQUEST 4/A3.03 shows the same rigid insulation as the R 10 under
slab on grade on detail 2 31A3.06 clearly states that R-38 is required below structural deck 'where plumbing
occurs' We will need direction/CO to install 6' of rigid foam anywhere except the area where plumbing
occurs and in that area the rigid insulation will not be insulating the plumbing,so it does not seem like it
should be any different than the rest.
DATE REPLY REQUESTED, 03/97109 CRITICAL TO SCHEDULE: XX YES D NO
ORIGINATOR SIGNATURE: Roland Ordona, Patsy Busby DATE: 03/1112009
COMMENTS: Note that 4/A3.03 indicates under slab insulation at conditioned space,which was R-38 for
the Energy Code submittal for the building and is indicated on G0 03 Energy Code Synopsis.The R 10 is for
perimeter insulation on grade under slab per energy code requirements as indicated on 2/A3.06. Note that
the detail 3/A3.06 was for a dropped ceiling under the plumbing areas and not the slab areas under
conditioned spaces as indicated elsewhere. Project must comply with energy code requirements submitted
for the building permit. Stan Cruse, Krei Architecture, 3-12-2009.
RFl Number- 329.D
Q\Documents and Settings\crusesta\Desktop\Gateway RF1#329.D Response 3-12-09.doe
Page 1 of 1
Internet Message Kovell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan, Robert Kugen, Ingo Goiter
Cc: Jim Mahtum, BillAtton, Lindsay Murray- Roger Horton, Tom Ellis
Date- 03/12/2009 09.34 25 AM
Subject: RE. REF#329D
' TEXT.htm
RFI 329D 3 12-09 pdf
Ingo,
Attached is response to RFI 329D as requested
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710 6425
scruse@parametrix.com<mai lto•scruse@parametrix.com>
From: Ingo Goiter [mailto.igotterCxltech.com]
Sent: Thursday March 12, 2009 8.46 AM
To- Robert Kugen, James Dugan
Cc: Roger Horton, Tom Ellis; Bill Alton, Jim Mahtum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: REF#329D
Jim,
Attached is RFI #3291)for your review and response by 3/16/09 Thank you.
Ingo Goiter PE
Construction Manager
Exettech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech com<mailto•igotter@xltech com>
Ph 360.417 3803
Fax: 360.417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settings`Temp\messages.xml 4/21/2009
� yz
1 > RIJ ; NG
Ems.
W A S H I N G T O N U S A
Community & Economic Development Department
March 10 2009
Primo Construction
m: Jennifer Howell
4 P O Box 296
Carlsborg, WA 98324
4 RE Gateway —West Parking Garage— 115 East Front Street
Temporary Certificate of Occupancy—Building Permit 07 742
¢° Dear Jennifer-
This letter will serve as notice that temporary occupancy of the west parking garage of the
Gateway development is hereby extended for 30 days per your letter dated February 27,
ai<
A 2009 The site has been inspected per your request, and Items 1, 2, and 5, identified in the
'$ Y ' January 28, 2009, correction letter, have been satisfactorily addressed. Temporary
occupancy is with the understanding that remaining Items 3 and 4 will also be satisfactorily
addressed no later than April 10, 2009
' ? If you have any questions regarding this matter, please don't hesitate to contact either myself
or Director West. We will be working with the City's Public Works and Utilities personnel
to address the two remaining items of concern as well
5'n
a Sincerely,
t�
Sue Roberds
Planning Manager
is
cc -N-a-t—han West, Director DCED
"" Glenn Cutler Director Public Works and Utilities
Steve Sperr City Engineer
Jim Mahlum,Engineer Public Works and Utilities
� d
C<y^ -
Phone 360-417-4750/Fax: 360-417-4711
Website wwwcityofpa.us/ Email smartgrowth@cityofpa.us
' 321 East Fifth Street P 0 Box 1150/ Port Angeles WA 98362-0217
x(4/1%2009) Nathan West Gateway project. �_ � ....w_m.�_._..._ � Page
From 'Tracy Gudgel' <tracy@zenovic.net>
To <jlierly@cityofpa.us>
Date 3/9/2009 12.25 PM
Subject: Gateway project
Attachments. Itr scan 03-09-09 pdf
Cc 'Steve Sperr' <Ssperr@cityofpa.us> 'Ingo Goller' <igoller@xltech.co
Jim and Nathan,
Here are the specific code sections which must be addressed to approve the
repair design. I did not reference each individual section of ACI 318
Section 11 7 since he should be able to read the subsections for himself
The subsections deal with yield strength, forces, etc.
A wet signed copy of the letter will be delivered to the Building Department
today
Tracy Gudgel, P E.
CIVIL ENNGINEfRING
RDLAND.5URVYING
_ U �,y� 301 East 6th Street,Suite 1
& ASSOCIATES Port Angeles,Washmgton 98362
I N C O R P O R A T E D
CITY OF PORT ANGELES (360)417-0501
March 9,2009 pept.of Community Development Fax(360)417-0514
Mr Jim Liedy E-mail:zenovic@olympus.net
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles,WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
As a follow up to my March 26,2009 letter the specific code sections that must be addressed in the
calculations or documentation by the design engineer to allow approval of the proposed repair of the spalled
area at PB-3 are as follows:
1 ACI 318-05,Section 11 7—Design for Shear-Friction(see requirements of this entire section)
Existing spalled area to be reinforced to comply with this section.
2. ACI 318-05,Appendix D—Anchoring to Concrete—epoxy anchorage shall comply with this section
and the appropriate ICC Evaluation report for the product specified. Please note that Hilt HY 150
does not comply with the requirements of 2006 IBC.
Please feel free to call if you have any questions regarding this matter
Sincerely
.i
Tracy Gudgel, P.E.
Fc: JN 08091
r
Si1?NP�
212 \
�. /,T+ -fir/ -, •`^ �_ D -\ '' _ ♦ ' ..,,,� �� / `� t��`
pip
- s_� ..b• .f _ \ .,- .'!-„ '" , �/ 'i'Z t , f- SwF urm.,
.>� :� '� I . r a "•'4 :lam � / ✓ .-<,,,,i 11
' ! 217 ; , f .r ,mak Q .
i
al
41
101
¢
" a. ,fir"oi "
=222
1.02
' 1 \ 1 1r
f 735 r
mop srvk0 ohu da,o gWd rl ,^ +
dm., w ' ems ,nii ,pin ,wdp.rv: F/,'s l� f f � !" � ,r t• 7
GW.
-P-ri94 �nqinee-rina Inc
Transmittal
Consulting Structural&Civil Engineering
_,C
�11W 0,
P hietnx,lic;
ki
4
at -"WW'984
bibi 406
tJ
W'G ','otewOy,trAiWt,,Cent r
w�,
nation
r
is
i.
nZANSWt,,TED:
'Nqqptry Overnight Other-
,q,AttA6hd& E]Xriddr'Separaiedov&r T�q` ,E]'
COPIES DATE DESCRIPTION
1 06-06-09 Repair at PB3–Field Sketch(FS-18)–Stamped by Ade Bright
THESE ARE TRANSMITTED AS CHECKED BELOW
El For Approval Z No Exceptions Taken El Returned After Loan To Us
M For Your Use E3 Make Corrections Noted E] Rejected–See Remarks
As Requested [] Revise and Resubmit ❑ Return—Corrected Prints
❑ For Review and Comment ❑
COMMENTS.
CC: Signed: Ade Bright
09 7" S.,
1 S.,td. \\"A c,810i iC e, 3777
B `p7
Y 7IQffS
I. 'EPmtY SMALL BE Im.n Inr ISD DB APPROVED EQUAL
2. CONCRETE TO HAVE COMPRESSIVE,SIRMCIN rc.4000 psi AT 26
DAYS?� • • •`• •~ • • • �• -I ]. REINFORCEMENT TO ASTM A015!y 60 ksi.
• I 4.-BEARING PAD TO BE JN INC MASTICORD OR APPROVED EQUAL
5. NOH-SHRINK GROUT SHALL BE MASTERiOW 500 BY MASTER BUILDERS
^ ^ OR APPROVEDEQUAL
A/ 4-O• 1 A/ 6. DOWELS SHALL NOT COMPROMISE EMS77NS WALL REBAR DOWELS SHALL
1 I HOOK OVER INTL"VERTICAL WALL BARS
PLAN
1
EXIST=sAe
m FB]
I I PLAZA n 21'-v +
EYJS77MG WALL—, I W
BEARING PAD AND EXISTING I
COAO-G PAD DFAGONAL WALL
FILLER--
I I 1 •I '
1 r
+ I '
I I+ f
• i•_0•
HOOK O PLAN • •
Htbh'TOP I
Lmc
+ m COVE
• j
1 112*CONC
COVER
1 1 5 • •
I • I � m
I
I
1
9912 EF I
AL HOOKS I
• f • I
1
GRADE SLAB • • BEARING
OF
n EL 10-0- BEAM)
IV1-'B 1/2•
EPDXY 5615J1 ENBf0 B 1/Y APPLY CONCRETE I/2'COMPRESSIBLE
WTO FAIST)NG WALL 5'EE NOTE 6 I BONDING AGENT 'FILLER
REMOVE LOOSE CONCRETE
AND arw suRFACE FDR• e1/2'r6'x]o'./
NON-SHRINK GROUT (2J 3/4'pA r4'
I • STUDS a IN CA
m
ELEVATION SECTION �� DETAIL �1
SCALE- 3H'.1'-0' — E evO o N SCALE: 1/4' V-0' — SCALE.- 1/2'.I'-0'
s Mean ® '� BRIGHT ENGIN&6RIIiG,INC van ee
L TMpF �+, , Me, •.0w--w PORT.ANGELES INTERNATIONAL �-+e
�.�1=7 w .�I re_w A Mw�1 Pro«» •r roN L c� G s mb mist GATEWAY TRANSPORTATION CENTER
i 10-w wMor ]o-ws �s iea•s REPAIR AT P133
Page 1 of 1
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Ingo Goller
Cc: ab@brighteng.com; Jim Mahlum, Diane Lenius; James Dugan, Tom De Laat, Bill Alton, Lindsay
Murray- Roger Horton Tom Ellis
Date- 03/06/2009 11 29.28 AM
Subject: Repair at P133
TEXT htm
P,AIG_P63_FS-18_030609._pdf
Ingo,
Based on not having to be involved in a conference call this morning, Bright Engineering was able to complete the
revisions to the P133 repair early
See attached transmittal and drawing. As Diane Lenius indicated, the revise design conforms with the minor
suggestions by Bob Mast a licensed professional structural engineer from Berger/Abam in his 24 February 2009 letter
we received 4 March 2009 Please proceed with the repairs.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253.752.9865
cell. 360 710 6425
scruse@parametrix.com<mai lto:scruse@parametrix.com>
file.//C \Documents and SettmgsJheath\Local Settings\Temp\messages.xml 4/21/2009
e-rigkt Qngineering Inc Transmittal
Consulting Structural&Civil Engineering
TO: Stan Cruse,AIA,.LEED w.2 APDATE. March 6,2009
Parametrix,Inc.
2102 N Pearl Street,Suite 301:
Tacoma,WA 98406
RE. PortAngeles International Gateway Transit Ce'riter BEI 4 116.03R
ITEMS TRANSMITTED- VIA.
p Regular .°Priority ® Overnight ❑ Courier ❑ Other:
® Attached" [3-Under Separate Cover Mair Mail Mair Cust,Pickup
COPIES DATE DESCRIPTION
1 06-06-09 Repair at PB3—Field Sketch(FS-18)—Stamped by Ade Bright
THESE ARE TRANSMITTED AS CHECKED BELOW
❑ For Approval ® No Exceptions Taken ❑ Returned After Loan To Us
❑ For Your Use ❑ Make Corrections Noted ❑ Rejected—See Remarks
® As Requested ❑ Revise and Resubmit ❑ Return_Corrected Prints
❑ For Review and Comment ❑
COMMENTS
CC: Signed. Ade Bright
1801,7:l, A� 100 ,td.. 9,.101-13e,1 pl„ U6 6? 777 1 f, 206 02 1°,i
B `nJ
1, EPDXY SHALL BE MILR HIT 150 0.4 APPROVED EWAL.
2. CONCRETE TO HAYS COMPRESSIVE STRENGTH Fc 4000 Ps AT 2B
pa Y5.
a—pT • • •+ • - • • p
�• J, REINFORCEMENT TO ASTM A575/y 60 ksi.
L
LL 1
• 5 I 1. BEAR/NG PAD 70 BE JM INC MASRCORD OR APPROVED EWAL.
5. NON-SHR GROUT SHALL BE MASIERfLOW SCO BY MASTER BUILDERS
Or,APPROVED EWAL
4'-0" Al 6. DOWELS SHALL NOT COMPROMISE EXISTING WALL REBAR.DOWELS SHALL
HOOK OVER INTERIOR YERRCAL WALL BARS.
f
PLAN
SCALE:J/4- 1'_0"
EXISTING SLAB
m � PBJ T PLAZA EL 21' 7'
EXISTING WALL •1 I
BEARING PAD AND EXISBNG
I 1
COMPRESSIBLE DIACONAL WALL _
FILLER
' • 1
— i P83
I
I
• 1'-0'
/6412 EF PLAN e o
HOOK TOP I
flJ I [ COYER
I 1 1 2''.NC
t I I o • • COYER
I I
I
160+2 EF I 1 �
ALT HOOKS I —
• • ;—
1 • • BEAR/NC PAD 6x3Dxi/2'
1 GRADE
SLAB (GLUE TO UNDERSIDE OF
• E1 -Or BEAM)
1/2'
EPDXY 5615)_LEMBED 8 1/2' I BPONDINGPLY ENCONCRETE ! \ i1LLER COMPRESSIBLE
INTO EXISTING WALL SEE N07E 6-1
1
AREMOVE LOOSE CONCRETE
NO CLEAN SURFACE FORLj ' ---P_7/2'x6'x30'w/
NON-SHRINK GROUT--' (2)3/4"DIA x4'
—STUDS O iB GA
ELEVATION SECTION DETAIL rj1)
SCALE: 3/4'.1'-0' - OC SCALE: 3/4" 10' - SCALE: 1/2" -
.0 nr'au.s wm e. -s•,c.ro s- �ON RIGHT ENGINEEBING.I NC
B.B 1 c-- J �„� H�s « vl nK awl• OR ANGELES INTERNATIONAL Ts to
GATEWAY TRANSPORTATION CENTER
B BOB MAST 1 1+-Oi CCuwfNl 3 -OB BuW I a —�o� `S �l X306'-I6Y3-J>» MFar 106-E15 JGSI
A I zio-oe /w mtlas `[m� s-6-+BD� REPAIR AT PB3
re rp3p n�
Page 12 of 26
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Glenn Cutter- Nathan West; James Dugan, Ingo Gotler
Cc: ab@brighteng.com, Jim Mahtum; Diane Lenius; Tom De Laat, BillAtton Lindsay Murray- Roger
Horton; Tom Ellis
Date- 03/04/2009 03 07 33 PM
Subject: RE. Design Delamination Repair Review
10 TEXT htm
Ingo,
I have one question you did not provide us with a copy of Bob Mast's letter reviewing the design dated 2/24/09 that
was mentioned in the Zenovic letter dated 2/26/09 It would be helpful for our review to see that letter
We are trying to have Ade come to our Tacoma office for a conference call. The timing of the request for a call
tomorrow is unfortunate Ade is out of the office today with the flu and will not be able to meet with us until Friday
but hopefully we can reschedule for Friday morning, this will give us more time to review the information.
On Friday we will use our Global Crossing Conference call to our office we will be the Chair in order to use the
system. I will get back to you when we have a time arranged and hopefully between 8 and 12 is stilt acceptable
Please call the following number and listen to the instructions 1-800-747 5150 you will be asked to enter the
following number followed by the#(pound) key 3770014#
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From. Ingo Gotler [maitto•igol[er@xttech.com]
Sent: Wednesday March 04 2009 2.37 PM
To Stan Cruse James Dugan, gcutter@cityofpa.us, nwest@cityofpa.us
Cc: Roger Horton* Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray- Roger Horton, Tom Ellis;
Bill Alton; Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray- Roger Horton, Tom Ellis, Bit[Alton Jim Mahlum
[Jmahlum@cityofpa.us] Lindsay Murray- Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us]
Lindsay Murray
Subject: Design Delamination Repair Review
Jim / Stan
As we discussed in our phone conversation today the attached two letters regarding the design for the proposed
delamination repair express the concerns of the reviewer for the City of Port Angeles Building Official. The extent
and tone of the review comments reflect the level of concern for the design and also an endeavor to assist in
specifically addressing these concerns. These comments are not an intent to direct the design of the delamination
repair The letter dated February 18, 2009 states that the design for the proposed delamination repair is not
acceptable and lists five items of concern along with suggestions for how these concerns may be addressed. After
discussing the design for the repair with Robert Mast of BERGER/ABAM, the second letter dated February 26 2009
was issued revising this stance and lists four areas of concern along with suggested means for addressing the areas of
concern. In summary the design for the proposed repair is acceptable with some revisions enumerated in the letter
dated February 26 2009 1 want to emphasize again, that the suggestions presented in both attached letter are not
to construed as design directions but are offered to assist in addressing the concerns expressed in the letters. Please
read these letters with this in mind.
In order to forestall a letter campaign we request a conference phone or in person, Thursday morning March 5
2009 The Building Official and his representative will be available between 8:OOAM to 12:OOPM. Please provide phone
numbers for the people that will be included in the teleconference if that is the preferred conference forum.
file.//C \Documents and Settmgs\jheath\Local Settmgs\Temp\messages.xml 4/21/2009 '
Page 13 of 26
Please have either Diane Lenius or Peter Battuello available to this conference Thank you.
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto.igolter@xttech.com>
Ph: 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
.:� C EffCMI.tKINEERING
Et. # a�V3:I� �.; ;AND°SURVEYING.
1, .. Feb �2009
301 East 6th Street,Suite 1
& ASSOCIATES Port Angeles,Washington 98362
I NCORPO RATED CITY OF PORT ANGELES
Dept.of Community Development 1 (360)417-0501
February 26,2009 Fax(360)417-0514
Mr Jim Lierly E-mail:zenovic@olympus.net
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles,WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
This office has reviewed the letter dated 2/24/09 from Robert Mast concerning the proposed spall repair
under PB-3 dated proposed by Bright Engineering, Inc(2/10/09). Subsequently I discussed the letter with
Mr Mast and reviewed the recommendation by Ingo Goller of Exeltech(2/25/09)and a response from Stan
Cruse of Parametrix(2/25/09).
Based on this review my comments are:
The proposed addition of ties across the"blank' area would help address the shear friction issues
noted in my review letter regarding this fix by reinforcing the proposed grout repair It should be noted
that per ACI 318 the shear friction loads should have been addressed in the original design;Mr Mast
concurs with my assessment. Therefore these proposed additional ties should be designed to meet the
required shear friction load determined by calculation to account for temperature,shrinkage forces and
elastic shortening. These ties should be designed to develop the specified yield strength as noted in
item#2 of my letter of 2/18/09 It may be possible to use smaller ties as recommended by Mr Mast and
use epoxy anchorage.
If the epoxy anchorage system cannot develop the yield strength to conform to requirements of ACI 318
as noted in item#4 of my letter then the ties should extend through the wall to comply with this
requirement. It should be noted that in my conversation with Mr Mast he stated that he recommended
to Mr Bright that anchorage be extended through the wall to the back side. If this is not feasible it would
seem that Ingo's recommendation to fill the entire area with concrete rather than using a grout repair
and concrete might be more appropriate. Closed ties could be incorporated so that the concrete in the
spalled area would at least be integral with the new concrete wall and therefore create a mechanism to
resist shear friction forces with the proposed ties into the existing wall.
It would seem that the bearing pad is not necessary- Mr Mast concurs with this assessment.
Eliminating the bearing pad and pouring snug against the bottom of the beam would minimize the
chance of a void. Proper consolidation and extending the new wall above the soffit of the beam to
create hydraulic pressure would further reduce this possibility It would seem appropriate to let the
patch help carry the load since a failure in the existing wall and settlement onto the repair wall would
create possible differential settlement issues with post tensioned beams being sensitive to differential
settlement.
Removal of the W dowels into the bottom of the beam is appropriate and might actually eliminate
additional concerns.
The design engineer should provide a revised design complying with the recommendations of Mast's letter
and the Code requirements noted above and the design should including use of the proper epoxy meeting
requirements of ACI 318 with calculations complying with ACI 3180-5,including group action factor
requirements. It is worth noting-that this lack of shear friction reinforcement design discussed above is
present under all the post tensioned beams in the structure although at this time no failures have surfaced
except at PB-3.
Sincerely
vl
�w06sxt
Tracy Gudgel, P.E.
Fc: JN 08091
a
FSSION�' y
Page 16 of 26
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan Robert Kugen Ingo Goiter
Cc: ab@brighteng.com; Jim Mahlum; Nathan West, Bill Alton Lindsay Murray- Roger Horton, Tom Ellis
Date- 02/25/2009 02:08.34 PM
Subject: RE. Delamination Repair
TEXT.htm
Ingo,
By doing it with this method you have the potential for not filling or leaving a void behind the bearing pad and plate
(1 inch thick by 24 inches long) How will you make sure this is completely filled.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto.scruse@parametrix.com>
From: Ingo Goiter [mailto•igollerC�''xltech.com]
Sent: Wednesday February 25 2009 1.02 PM
To: Robert Kugen, James Dugan
Cc: nwest@cityofpa.us; Roger Horton Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray-
ab@brighteng.com
Subject. Delamination Repair
Jim;
For the final delamination repair I would recommend casting the fascia wall monolithically instead of using a
patching grout (prepackaged repair grout) and casting the fascia wall against the grouted face The irregular
delaminated surface will make the new fascia wall bond both mechanically as well as chemically enhancing the shear
load transfer between the existing wall and the fascia wall.
I have included Ade as a copy recipient to get his input on my suggestion.
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mailto igoller@xltech com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.HC \Documents and SettmgsJheath\Local Settmgs\Temp\messages.xm1 4/21/2009
Page 17 of 26
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan
Cc: Jim Mahlum
Date- 02/25/2009 08.50:17 AM
Subject: FW RFI #329C
TEXT.htm
FYI
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710 6425
scruse@parametrix.com<mailto:scruse@parametrix.com>
From Ingo Goiter [mailto•igoller@xltech.com]
Sent: Wednesday February 25, 2009 8.48 AM
To: Stan Cruse
Subject: RE. RFI #329C
Sta n,
Thank you. I will pursue it as you have recommended.
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech com<mailto igoller@xltech.com>
Ph. 360.417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. Stan Cruse
Sent: Wed 2/25/2009 7 54 AM
To: Ingo Goiter- Robert Kugen, James Dugan
Cc: Roger Horton, Tom Ellis, Bill Alton Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. RE. RFI #329C
Ingo,
The Washington State Energy Code requirements calculations were submitted to the City of Port Angeles for the
permitting process, the building HVAC system was designed with R 38 insulation for conditioned spaces over
stab/unconditioned spaces as noted on Sheet G0.03 Energy Code Synopsis. If you are requesting a deviation from
code requirements, please discuss with the building official.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 18 of 26
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710 6425
scruse@parametrix.com<mailto:scruse@parametrix.com>
From. Ingo Goiter [mailto•igoller@xltech.com]
Sent: Wednesday February 25 2009 6.53 AM
To. Robert Kugen, James Dugan
Cc: Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: RE. RFI #329C
Is it necessary to have insulation with a R 38 value installed under the transit building slab?Will one layer of rigid R
10 value insulation be sufficient?
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igollerC xltech.com<mai Ito:igoller@xltech.com>
Ph: 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From Stan Cruse
Sent: Tue 2/24/2009 10.51 AM
To- Ingo Goiter- Robert Kugen, James Dugan
Cc: Roger Horton, Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. RE. RFI #329C
Ingo,
See attached RFI 329C response
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruseCa)parametrix.com<mai lto.scruse@parametrix.com>
From. Ingo Goiter[mailto:igolier@xltech.com]
Sent: Tuesday February 24 2009 10:29 AM
To: Robert Kugen, James Dugan
Cc: Roger Horton Tom Ellis, Bill Alton Jim Mahlum [Jmahlum@cityofpa.us], Lindsay Murray
Subject. FW- RFI #329C
Attached, for sure this this time is RFI #329C.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 19 of 26
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto:igoller@xltech.com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From: Ingo Goiter
Sent: Tue 2/24/2009 10.03 AM
To: rkugen@parametrix.com, jdugan@parametrix.com
Cc: Roger Horton Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. RFI#329C
Jim,
Attached is RFI #329C reflecting athe contractors proposed insulation under the transit building. Please review and
respond by 2/27/09 Thank you
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mailto•igolter@xltech com>
Ph 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 20 of 26
r
i Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan, Robert Kugen, Ingo Goller
Cc: Jim Mahlum; BillAlton, Lindsay Murray, Roger Horton Tom Ellis
Date- 02/25/2009 07 54 33 AM
Subject: RE. RFI #329C
e TEXT.htm
Ingo,
The Washington State Energy Code requirements calculations were submitted to the City of Port Angeles for the
permitting process, the building HVAC system was designed with R 38 insulation for conditioned spaces over
slab/unconditioned spaces as noted on Sheet G0.03, Energy Code Synopsis. If you are requesting a deviation from
code requirements, please discuss with the building official.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710.6425
scruse@parametrix.com<mailto•scruse@parametrix.com>
From. Ingo Goller [mailto•igoller@xltech.com]
Sent: Wednesday February 25 2009 6.53 AM
To: Robert Kugen James Dugan
Cc: Roger Horton Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: RE. RFI #329C
Is it necessary to have insulation with a R 38 value installed under the transit building slab?Will one layer of rigid R
10 value insulation be sufficient?
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech com<mailto.igoller@xltech.com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. Stan Cruse
Sent: Tue 2/24/2009 10.51 AM
To: Ingo Goller• Robert Kugen, James Dugan
Cc: Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: RE. RFI #329C
Ingo,
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 21 of 26
See attached RFI 329C response
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From. Ingo Goller [mailto•igollerCxltech.com]
Sent: Tuesday February 24 2009 10.29 AM
To: Robert Kugen, James Dugan
Cc: Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. FW RFI #329C
Attached, for sure this this time is RFI #329C.
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto:igoller@xltech.com>
Ph 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. Ingo Goller
Sent: Tue 2/24/2009 10.03 AM
To- rkugen@parametrix.com, jdugan@parametrix.com
Cc: Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. RFI #329C
Jim;
Attached is RFI #329C reflecting athe contractors proposed insulation under the transit building. Please review and
respond by 2/27/09 Thank you
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech com<mailto.igoller@xltech.com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
file.//C \Documents and Settmgs\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 22 of 26
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 25 of 26
Internet Message NovelL
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan Robert Kugen Ingo Goiter
Cc: Jim Mahlum, BillAlton, Lindsay Murray- Roger Horton, Tom Ellis
Date- 02/24/2009 10.51 03 AM
Subject: RE. RFI #329C
I& TEXT.htm
3290 2 24-09.pdf
Ingo
See attached RFI 329C response
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710.6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From: Ingo Goiter [mailto•igoller@xltech.com]
Sent: Tuesday February 24 2009 1029 AM
To Robert Kugen, James Dugan
Cc: Roger Horton, Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: FW RFI #329C
Attached, for sure this this time is RFI #329C.
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto.igoller@xltech.com>
Ph 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From Ingo Goiter
Sent. Tue 2/24/2009 10.03 AM
To rkugen@parametrix.com, jdugan@parametrix.com
Cc: Roger Horton, Tom Ellis, Bill Alton Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. RFI #329C
Jim,
Attached is RFI #329C reflecting athe contractors proposed insulation under the transit building. Please review and
respond by 2/27/09 Thank you
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 26 of 26
f
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto.igoller@xltech.com>
Ph 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 1 of 13
� 1
Internet Message Novell.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan Robert Kugen, Ingo Goiter
Cc: Jim Mahlum, BillAlton, Lindsay Murray- Roger Horton, Tom Ellis
Date- 02/24/2009 10.04 29 AM
Subject: RE. RFI #329C
e TEXT.htm
Not attached?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From. Ingo Goiter [mailto igotler@xltech.com]
Sent: Tuesday February 24 2009 10:03 AM
To: Robert Kugen, James Dugan
Cc: Roger Horton Tom Ellis, Bill Alton Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: RFI#329C
Jim,
Attached is RFI #329C reflecting athe contractors proposed insulation under the transit building. Please review and
respond by 2/27/09 Thank you
Ingo Goiter PE
Construction Manager
Exettech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech com<mailto•igolter@xltech com>
Ph: 360.417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all tosses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
�_XjZ5
Ogg
Yg
Rg",
NOR
A q O"M
eoZ�
A
'A
KV
i2M-'NORR3�,NZ(
k"t t
'w"I"Z 4TA
g
w
V"p
EN
mtvt
IN
MMI111,'31 - ., -V -,�,
M F
-'a
MIA!
V
g
90 1
KI:
g.
01 f,
g,
-D
4r
or
RIM
rA ixi
V
IN
spo
X-111
MINOR
-M R
W
&
INW. -IImI..:.
R
K
6
Page 1 of 1
Delaminated Area
Delamination also extends along„
the other side 6f,•PB3
file.//E Vim Mahlum\account\att\499D5831.DOMAIN6.PO6 100 17A6169 1 13E91 1\Dra. 4/21/2009
From BEI 206 625 1851 04/01/2009 14 59 #055 P 0011001
r,
n•
BEAGER/ABAM ENGINEERS INC PLANNING
35901 Ninth Avenue South Suite 300 ENGINEERING
Federal Way Wathlapt0a 99009.2600 BERGER/ABAM ENVIRONMENTAL
2061431 2300 FAX 206/431 2230 E N •G I N E E R S I N C PROGRAM MANAGEMENT
trtrtr.abam tom
24 February 2009
is
Mr Craig Miller,Attorney
711 East Front Street,Suite A
Port Angeles,WA 98362
Re: Port Angeles International Gatew*,Spall Repair
BERGER/ABAM Job No FABLD-09-115
Dear Craig.
I have read the Bright Engineering letter of 10 February 2009 and the Zenovic&Associates
letter of 18 February 2009 I understand the positions expressed in each letter
There is a simple and direct way to think of how the repair works. The repair is a new 12-inch.xy
wall that could provide support for PB-3 in the highly unlikely event that it would be needed.
Because the "new wall" is not directly supported by the piles,the load would need to be
transferred to the existing wail by shear friction- The eccentricity of the load to the plane of the
shear fiction is only 3 inches,not unlike the eccentricity of slab compressive forces in a
composite T-beam in flexure.
The gross area of the shear plane is about 7.5 by 8 feet, or 8,640 square inches. The nominal
shear stress un,for a 361 kip factored load and a$of 0.75,is 56 psi. This is extremely low
According to 17.5.3.2 of the ACI 318 code,only minimum ties(50 psi x area)would be required.
This amounts to 432 kips of nominal tension force in the ties. At 60 ksi, this is 7.2 square inches
of steel in the 41 ties shown in the repair drawing, or 0 18 square inch per tie.
The purpose of the ties is to stitch the old and new walls together Because of this,I prefer to
extend the distribution of ties across the 'blank' area below the beam,even if they are not
counted as part of the tie reinforcement because of insufficient anchorage in the area of the
spall. The size of the ties could be reduced to 95,or possibly#4. 1 see no need for the 3/4-inch
dowels drilled into the beams and I suggest their deletion.
In surnmary it would be appropriate to approve the proposed repair with the suggested change:
Sincerely
' At- F"
Robert F bast,PE,SE
Senior Principal
RFM:nb
i
BERGER/ARAM ENGINEERS INC PLANNING
Ninth Avenue South Suite 300 r^^ER/A-BA-M ENGINEERING
Feder B
Federal Way Washington 98003 2600 tKv ENVIRONMENTAL
2061431 2300 FAX 2061431 2250 E N G I N E E R S I N C PROGRAM MANAGEMENT
www.ahatn corn L
24 February 2009
Mr Craig Miller,Attorney
711 East Front Street,Suite A
Port Angeles,WA 98362
Re: Port Angeles International Gateway Spall Repair
BERGER/ABAM Job No. FABLD-09-115
Dear Craig:
I have read the Bright Engineering letter of 10 February 2009 and the Zenovic&Associates
letter of 18 February 2009 I understand the positions expressed in each letter
There is a simple and direct way to think of how the repair works. The repair is a new 12-inch
wall that could provide support for PB-3 in the highly unlikely event that it would be needed.
Because the new wall is not directly supported by the piles,the load would need to be
transferred to the existing wall by shear friction. The eccentricity of the load to the plane of the
shear friction is only 3 inches,not unlike the eccentricity of slab compressive forces in a
composite T-beam in flexure
The gross area of the shear plane is about 7.5 by 8 feet, or 8,640 square inches. The nominal
shear stress un, for a 361 kip factored load and a�of 0.75,is 56 psi.. This is extremely low
According to 17.5.3.2 of the ACI 318 code,only minimum ties(50 psi x area) would be required.
This amounts to 432 kips of nominal tension force in the ties. At 60 ksi,this is 7.2 square inches
of steel in the 41 ties shown in the repair drawing,or 0 18 square inch per tie
The purpose of the ties is to stitch the old and new walls together Because of this, I prefer to
extend the distribution of ties across the 'blank' area below the beam, even if they are not
counted as part of the tie reinforcement because of insufficient anchorage in the area of the
spall. The size of the ties could be reduced to#5, or possibly #4. I see no need for the 3/4-inch
dowels drilled into the beam,and I suggest their. deletion.
In summary it would be appropriate to approve the proposed repair with the suggested changes.
Sincerely
lka —
Robert Fr-Mast,PE,SE
Senior Principal
RFM:nb
18 '80,91 -t 1 2 1- 1
06*9z!49 .9
17 e5; 61
69 if+9 -4
A�
/Ooow
ED
I _J
01,
9�
33S
'>
4
/*
(v ae 3AUiOGAJ)
V8VO
ONIAdVd
PROPOSED ADA ACCESSIBLE PAR-KING
T
jrr
�
VMAQ
as roaa rxs i a��oo .a-
'JI�YdJ a
SIX
:li` .!.�_ C 5 r �., T t 'U�GDvf$�1IV� ii ' _,,»'''' ,5` v�t♦917yeM
�blooa-.iz �w 1. ,�' `j =� `� '��: s ;� b�i�r �.:, -;;�,wua:�N,�„ ••�•*---� au ��:j� {
VVI
ale 38ye
.aero a•>n mu 1 . ° '�p;,� t. ••. '� �r � �'11tl� � ,s.�� -
..+
- '�,t`l�x.`•"�c � � µ '�,IpCAlj�.y I"F {Y !` ,!. .�i, , 'C, ,+ �y lF !' off'' P.'�' �'� 1', !: �`� '' r�
� '� 'e� to din :9nS I 1 � ! 'k .I� �`�' # s� •s4���° ' !�1 � �\ " � 1
�� ✓a s?I
.:�'::. 1'.atl....�.rd!`„. �',�i•�..J•, L ?�' _.4r; :�L'' r< a?c.:, .. 3 h�
:rad �_ � i i:• .�.� ? 1 #��a� �, 't •<,�S �-” _�; . ' �, /1 r f i
�N a11t18,J ISNbk1 { y
'�'� -/s�r.,•F!�GY.y"� / Di�L�9 X�y3 a^!� � k'x Y�^�1 �l;lF'�`" • �'J :,•'/Y y //.,��k'.#�, �$x �r � -r' .('
id i",3{ IK µ� '-
�\ '.`. ..', ^"{ r^gY�� p.,r'..� 1— — ....: '�.T , "fir-":,. ..�' •my�__......, (x'„ .
�s �'�� �, r 1.1'*�{• •��. �,p;, '";�'I. :! � � .. /.- '!''�!.., meg;'• I
171^^ •I' 's'_^�.. !�ii� �7394vn. _,::.$!p.::.. =�*u:.'...
�^�� /ate K
LJ
WIP,
.:gym / � C�}
The Gateway
Beam Camber Check
Beam Sta* Elev 1 Elev 2 Elev 3 Avg. Elev Camber(in.)
East 0+5860 107 044 107 047 107 048 107 046 0 000 Assume zero camber
East 0+4395 107 062 107 063 107 059 107 061 0 182
East 0+2930 107 081 107 079 107 078 107 079 0 400 linea sloped line
East 0+1465 107076, 107077, 107 079 107 077 0 378 between elevation
East 0+00 107 044 107 045 107 048 107 046 0 000 107 046 and 107 046
Center Beam (PB11 PB12, and PB13)
West 0+00 107 037 107 038 107 040 107 038 0 000 Assume zero camber
West 0+1530 107 024 107 027 107 028 107 026 -0.210
West 0+3060 107 035 107 036 107 040 107 037 -0148 linea sloped line
West 0+4590 _ 107 031 ___107 03_3 --1-07 031 107 032 _-0.278 between elevation
West 0+61.20 107 058 107 064 107 059 107 060 0 000 107 038 and 107 060
Measured 1-13-09
Temperature 43° F
Weather Ocst and Calm
Beam Sta* Elev 1 Elev 2 Elev 3 Avg. Elev Camber(in.)
East 0+5860 107 047 107 048 107 048 107 048 0 000
East 0+4395 107 060 107 059 107 060 107 060 0 158 Assume zero camber
East 0+2930 107 077 107 078 107 079 107 078 0 392 linea sloped line
East 0+1465 107076, 107079, 107 081 107 079 0 414 between elevation
East 0+00 107 042 107 044 107 043 107 043 0 000 107 048 and 107 043
Center Beam (PB11, PB12, and PB13)
West 0+00 107 036 107 037 107 039 107 037 0 000
West 0+1530 107 021 107 022 107 025 107 023 -0.245 Assume zero camber
West 0+3060 107 034 107 032 107 033 107 033 -0190 linea sloped line
West 0+4590 107 027 107 029 107 028 107 028 -0319 between elevation
West 0+61.20 107 059 107 060 107 062 107 060 0 000 107 037 and 107 060
Measured 1-20-09
Temperature 37° F
Weather Ocst and Calm
Beam Sta* Elev 1 Elev 2 Elev 3 Avg. Elev Camber(in.)
East 0+5860 107 051 107 048 107 049 107 049 0 000 Assume zero camber
East 0+4395 107 060 107 059 107 061 107 060 0 141
East 0+2930 107 078 107 077 107 078 107 078 0 366 linea sloped line
East 0+1465 107076, 107078, 107 077 107 077 0 371 between elevation
East 0+00 107 044 107 046 107 045 107 045 0 000 107 049 and 107 045
Center Beam (PB11, PB12, and PB13)
West 0+00 107 037 107 035 107 036 107 036 0 000
West 0+1530 107 024 107 021 107 019 107.021 -0.252 Assume zero camber
West 0+3060 107 034 107 033 107 031 107 033 -0192 line a sloped line
West 0+4590 107 027 107 027 107 027 107 027 -0336 between elevation
West 0+61.20 107 062 107 060 107 062 107 061 0 000 107 036 and 107 061
Measured 2-17-09
Temperature 42° F
Weather Pcld and Calm
*Stationing from east face of center beam (PBI 1)to east for east beam
Stationing from west face of center beam PB11 to west for west beam
2/17/2009
The Gateway
Beam Camber Check
Beam Sta* Elev 1 Elev 2 Elev 3 Avg. Elev Camber(in.)
East 0+5860 107 079 107 079 107 079 107 079 0 000
East 0+4395 107 090 107 090 107 089 107 090 0 163 Assume zero camber
East 0+2930 107 102 107 106 107 105 107 104 �0374
line a sloped line
East 0+1465 107100 107101 107102 107101 369 between elevation
East 0+00 107 067 107 067 107 068 107 067 0 000 107 067 and 107 079
Center Beam (PB11, PB12, and PB13)
West 0+00 107 057 107 057 107 057 107 057 0 000
West 0+1530 107 044 107 045 107 043 107 044 -0.246 Assume zero camber
West 0+3060 107 058 107 058 107 058 107 058 -0168 line a sloped line
West_ 0+4590 107 051 107 052 107 051 107 051 -0338 between elevation
West 0+61.20 107 088 107 086 107 087 107 087 0 000 107 057 and 107 087
Measured 12-16-08
Temperature 22° F
Weather Clear and Calm
Beam Sta* Elev 1 Elev 2 Elev 3 Avg. Elev Camber(in.)
East 0+5860 107 044 107 048 107 051 107 048 0000
East 0+4395 107 060 107 066 107 061 107 062 018 Assume zero camber
East 0+2930 107 078 107 080 107 079 107 079 03981
398 linea sloped line
East 0+1465 107077, 107079, 107 076 107 077 0389
between elevation
East 0+00 107 043 107 046 107 043 107 044 0 000 107 044 and 107 048
Center Beam (PB11, PB12, and PB13)
West 0+00 107 034 107 039 107 035 107 036 0 000
West 0+1530 107 019 107 022 107 022 107 021 -0.260 Assume zero camber
West 0+3060 107 031 107 036 107 032 107 033 -019 line a sloped line
West 0+4590 107 027 107 029 107 028 107 028 -0336 between elevation
West 0+61.20 107 060 107 066 107 062 107 063 0 000 107 036 and 107 063
Measured 12-23-08
Temperature 27° F
Weather- Ocst and Calm
Beam Sta* Elev 1 Elev 2 Elev 3 Avg. Elev Camber(in.)
East 0+5860 107 051 107 053 107 050 107 051 0 000
East 0+4395 107 063 107 069 107 061 107 064 016 Assume zero camber
line a sloped line
East 0+2930 107 081 107 088 107 080 107 083 0 406
East 0+1465 107083, 107085, 107 079 107 082 0 411 between elevation
East 0+00 107 045 107 050 107 046 107 047 0 000 107 047 and 107 051
Center Beam (PB11 PB12, and PB13)
West 0+00 107 040 107 042 107 040 107 041 0 000
West 0+1530 107 024 107 029 107 022 107 025 -0.257 Assume zero camber
West 0+3060 107 034 107 040 107 037 107 037 -0182 line a sloped line
West 0+4590 107 030 107 038 107 030 107 033 -0303 between elevation
West 0+61.20 107062, 107 069 107 060 107 064 0 000 107 041 and 107 064
Measured 1-06-09
Temperature 39° F
,Weather* Ocst and Calm
2/17/2009
Y
��
�I
��
1
1
t
1
(2/13/20Q9)James Lierly Structural Calculations PAIG 021009.pdf� _�_ Page 1 I
STRUCTURAL CALCULATIONS
PORT ANGELES INTERNATIONAL GATEWAY
REPAIR OF CONCRETE SPALL UNDER PB-3
PREPARED FOR: KREI ARCHITECTURE—A PARAMETRIX COMPANY
DATE: FEBRUARY 10,2009 BEI No. 116.038
61 6W 7Ave. Suite 1100 I Seattle,WA 98101 1 T:206.625.3777 1 F•206.625.1851 1 www.biighteng.com I Info@brighteng.com
[(2/13/2009)James Lierly Structural_Calculations_PAIG_021099 pdf Page 2
6 right;engineering, Inc Consulting Structural and Civil Engineering
February 10,2009 BEI#116.03R
Parametrix,Inc.
Attn:Stan Cruse,Project Manager
2102 N Pearl Street,Suite 301
Tacoma,WA 98406
RE. PORT ANGELES INTERNATIONAL GATEWAY
Spall Repair
Stan,
The attached calculations and details are for the repair of spalled concrete under PB-3 This is a revision to
FS-18 that was previously submitted for review
Again,please note that the new concrete wall facing is designed to carry the entire reaction of PB-3 and is
doweled into the existing wall to act compositely for load transfer should the demand be required.
Please call me if you have any questions.
B ards,
��euti4q�
e t, SES' .
1 ,o
r
[(2/13/2009)James LierlyStructural Calculations PAIG 021009.pdf Page 3 J
bl �—i—• — —� a .in w
PLAN xocx nK.
swc e� 'cur i a '
srvn c /—c�nm.�wu
1 r I
I
1 �
."��;,��rt, ,gym�•��. � � ����..�,9.<
ELEVAPONrA'� SECTION DETAIL
PORT ANGELES IN IERNATIONAL
GATEWAY TRANSPORTATION CENTER
REPAIR AT PD3
,. 32 209 ... ._S_._t_ructural Caculations_P..RaI.G06662._,10.0a.9..._P-di_f.,._ _ Page 4
03
4�. ►
S� ftx�r
�r
jjj Lir 1 ti�.
fa
t .a r? 23 : S = 4-16 1
t�k
to i
PLikC4P
5,'ve, � ►� + �, a2,
J[(2-/T33/2-0—.09)-amesLierly Structural Calculations PAIG O21099.pdf Page 5
CBrlgkt C—noineerincg, Inc Consulting Structural and CMI Engineering
1809 7th M nue.Suite 1100 1 Seattle WA 98101 I P,206.625.3777 I F'206.625.1851 I nfo®bdghteng.com
Date: 2'-r7f.� By 1 BEI Nojj_�-'0 3 Sheet No.'?'*' of _Sheets
Subject: Qn T V\C.�j�9 1 — �-G I�t✓n.
4, cce t
I
3. 53 = l 9 a t
5- 2-
30 30
� s P.d W1os�
t 2rr�ct �g rsv S `�
_ `Z cps, �v cl �" ; o 4.3.4
5"V?
0 O i 1 f 7, VL _ O it,
013/2009James L'-e-r'y 8fructbraf )ons b2i Ona nrf
2rig�f C—noineertma Inc Consulting Stmicturof and Civil Engineering
18097th Av Suits 1100 I Seattle,WA 98101 I P'206.625.3777 I F'206.625.1851 I nfo@brighteng.com
Date: By- BEI No. Sheet No. 3 of'LSheels
Subject:
tis t d-P,
Ir2'/13/2Q09)James Lierly Structural Calculations PAIG 021009 pdf Page 7f
Consulting Structural and Civil Engineering
u I P'206.625.7777 1 P 206.625.1851 1 intoObnghleng. om
Dale: t By r 1 BEI No. No.—!t. ) ,b3 Sheet No. of Sheets
Subject: Pp-r4 *1 � ,
P
dry '3 l � o
a
SSE
r,
D ter,7b s `-8" e& c� — 2
2 . 9 Z 7 2 k
0
(2/13/2Q0 1)James,Lierly WStructural_Calculations_PAIG_021009 pot, y Page 8
k0141' I.
��Ji fG A+g�Ytrlci p��
ov, a,at7ra�
cc�ncV"e.'�2 cL�n,r�i
r� �/r/
von_5{�nrtt (' fIric6I5L�tL
I
F '1z x 300
iJ
tu
I
i
((2/13/2QG9)James Lierly Structural Calculations PAIG 021009 pdf Page 9
i
I
�t.61J t°sT r0�
iRT Psi
Aj,_k+' 1 so ov- afp rav ed uwl
1
p rc.66``r a 5� - c = 4Mv
3e �� ►�`e`` - Ix AY5 TM
C0rd1 ov
(2/1.3/21J(39)James Lierly Structural Calculations PAIG 021009.pdf- Page 1
f 7
b
t eKrs P f T w�res
o tK ev rCba�r wa t
l o ri ti f�ro vH 15e,(�,
i�isf wexGl 5i &-1- 21?1 1
6P
1
� pfVx
I — �r✓C� l 2 �F
� 1
i a o a
r s o o -
t
12-
Ai 4411
2w46/
lj
E y 61 �c
or ti fprov-eA �oaf
Page 2 of 13
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: ab@brighteng.com, Jim Mahlum, James Dugan Ingo Goller
Cc: Glenn Cutler; Diane Lenius, Tom De Laat; Bill Alton LindsayMurray Roger Horton, Tom Ellis
Date* 02/20/2009 10.26 31 AM
Subject: RE. Delamination Fix
Jim,
You need to be a party to defining the location of the cleanout. There is concern about the water seen leaking at the
wall or pipe This appears to be a construction issue We need you and exeltech to look at the leaking because there
is concern for freeze/thaw at the new wall. The pipe will be incorporated in the wall/design.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253.752.9865
cell. 360.710.6425
scruse@parametrix.com
-Original Message-
From. Jim Mahlum [mailto:Jmahlum@cityofpa.us]
Sent: Friday February 20 2009 8:27 AM
To- ab@brighteng.com, James Dugan, Stan Cruse Ingo Goller
Cc: Glenn Cutler- Diane Lenius, Tom De Laat; Bill Alton, Lindsay Murray Roger Horton, Tom Ellis
Subject: RE. Delamination Fix
ALL,
Whatever is done it SHALL, be incorporated into the final delamination fix and submitted to the Building Official for
final approval.
Jim
>>> Stan Cruse <SCruse@parametrix.com> 2/20/2009 8:23 AM>>>
Ingo,
Here are the two options for cleanouts, top or bottom of the wall.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710 6425
scruse@parametrix.com<mai lto•scruse@parametrix.com>
From: Stan Cruse
Sent: Thursday February 19 2009 1.06 PM
To: 'Ingo Goller' James Dugan, Jim Mahlum [Jmahlum@cityofpa.us] ab@brighteng.com
Cc: gcutler@cityofpa.us, Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray-
Tom
urrayTom De Laat, Diane Lenius
Subject. RE. Delamination Fix
Yes, I was aware it would not incase entire elbow which still provide for a clean out. Please define maintenance
requirement and the conditions indicated at the base
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 3 of 13
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710 6425
scruse@parametrix.com<mailto:scruse@parametrix.com>
From: Ingo Goller [mailto igoller@xltech.com]
Sent. Thursday February 19 2009 1 01 PM
To. Stan Cruse- James Dugan, Jim Mahlum [Jmahlum@cityofpa.us] ab@brighteng.com
Cc: gcutler@cityofpa.us; Roger Horton, Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray-
Tom De Laat; Diane Lenius
Subject: RE. Delamination Fix
Jim / Stan
The delamination repair has to extend along side of PB3 If the cast in-place concrete will extend along side of the
beam, it will also encase the elbow at the top of the pipe run See the attached picture
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mailto:igoller@xltech.com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. Stan Cruse
Sent: Thu 2/19/2009 10.36 AM
To- Ingo Goller• James Dugan, Jim Mahlum [Jmahlum@cityofpa.us] ab@brighteng.com
Cc: gcutler@cityofpa.us, Roger Horton Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray-
Tom
urrayTom De Laat, Diane Lenius
Subject: RE. Delamination Fix
Ingo,
We need definition as to drain pipe should remain accessible for maintenance purposes If the pipe is captured in
the wall there is still access to the pipe for clean out at the top of the wall as designed. The pipe cannot be
relocated, so you need to define the maintenance purposes. You should also note from the photo that the pie is
either leaking or there is water coming from the wall or the pipe is backed up, which would appear to be a
construction issue
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com<mailto.scruse@parametrix.com>
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 4 of 13
From: Ingo Goller [mailto igoller@xltech.com]
Sent: Thursday February 12, 2009 8.24 AM
To. James Dugan
Cc: gcutler@cityofpa.us, Roger Horton Tom Ellis, Bill Alton Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. RE. Delamination Fix
Jim,
I will search our photo file to find a picture showing the drain pipe
Also, I must remind you to not have Stan make direct contact as was requested by COPA official.
Thank you.
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mailto igoller@xltech com>
Ph. 360 417 3803
Fax: 360.417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From- James Dugan
Sent: Thu 2/12/2009 8:01 AM
To Ingo Goller
Cc: Stan Cruse
Subject: RE. Delamination Fix
Ingo Without the benefit of a picture or something similar regarding the condition you are referring to I cannot
determine from your email if you are asking a question, if there is an issue if you need something from us, or if you
are simply stating a fact for the record. Please advise
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253 278.8105
jdugan@parametrix.com
From Ingo Goller [mailto•igoller@xltech com]
Sent. Wednesday February 11 2009 3.28 PM
To: Stan Cruse- James Dugan, Mahlum, Jim
Cc: Weed, Terry- Diane Lenius
Subject. RE. Delamination Fix
Jim / Stan
There is a 4' diameter ductile iron pipe mounted to the wall and tied to a PVC pipe through the slab. The drain pipe
channels storm water collected on the plaza deck to the CB in the plaza garage The drain pipe should remain
accessible for maintenance purposes.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 5 of 13
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto.igoller@xltech.com>
Ph 360.417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From Stan Cruse
Sent. Tue 2/10/2009 5 13 PM
To. James Dugan, Mahlum, Jim
Cc: Weed, Terry- Goiter Ingo Diane Lenius
Subject: Delamination Fix
Attached is the delamination fix and beam support. We recommend that this be implemented unless you have
questions or comments that need to be addressed
Please contact Jim Dugan if you have any questions or comments.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse
Corporate Architect
phone- 360 850.5313
fax: 360.479 5961
scruse@parametrix.com<mailto:scruse@parametrix.com>
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 10 of 13
Internet Message NovelL
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: ab@brighteng.com; James Dugan, Ingo Goller
Cc: Glenn Cutler- Jim Mahlum, Diane Lenius, Tom De Laat, Bill Alton, Lindsay Murray- Roger Horton,
Tom Ellis
Date- 02/20/2009 08:23.15 AM
Subject: RE. Delamination Fix
10 m
TEXT_ht
2009022008.2213745 pdf
Ingo,
Here are the two options for cleanouts, top or bottom of the wall.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto:scruse@parametrix.com>
From. Stan Cruse
Sent: Thursday February 19 2009 1 06 PM
To. 'Ingo Goller' James Dugan, Jim Mahlum [Jmahlum@cityofpa.us] ab@brighteng.com
Cc: gcutler@cityofpa.us, Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray-
Tom
urrayTom De Laat, Diane Lenius
Subject: RE. Delamination Fix
Yes, I was aware it would not incase entire elbow which still provide for a clean out. Please define maintenance
requirement and the conditions indicated at the base
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto:scruse@parametrix.com>
From: Ingo Goller [mailto igoller@xltech com]
Sent: Thursday February 19 2009 1 01 PM
To: Stan Cruse- James Dugan, Jim Mahlum [Jmahlum@cityofpa.us] ab@brighteng.com
Cc: gcutler@cityofpa.us; Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray-
Tom
urrayTom De Laat, Diane Lenius
Subject: RE. Delamination Fix
Jim / Stan
The delamination repair has to extend along side of PB3 If the cast in-place concrete will extend along side of the
beam, it will also encase the elbow at the top of the pipe run See the attached picture
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 11 of 13
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech com<maitto:igoller@xltech.com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From Stan Cruse
Sent. Thu 2/19/2009 1036 AM
To: Ingo Goiter- James Dugan, Jim Mahlum [Jmahlum@cityofpa us] ab@brighteng.com
Cc: gcutler@cityofpa.us; Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray-
Tom De Laat; Diane Lenius
Subject: RE. Delamination Fix
Ingo,
We need definition as to drain pipe should remain accessible for maintenance purposes If the pipe is captured in
the wall there is still access to the pipe for clean out at the top of the watt as designed. The pipe cannot be
relocated, so you need to define the maintenance purposes. You should also note from the photo that the pie is
either leaking or there is water coming from the wall or the pipe is backed up, which would appear to be a
construction issue
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From: Ingo Goiter[maitto•igoller@xttech com]
Sent: Thursday February 12 2009 8:24 AM
To: James Dugan
Cc: gcutler@cityofpa.us, Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: RE. Delamination Fix
Jim;
I will search our photo file to find a picture showing the drain pipe
Also, I must remind you to not have Stan make direct contact as was requested by COPA official.
Thank you.
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xttech.com<mai lto:igoller@xltech.com>
Ph 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 12 of 13
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. James Dugan
Sent: Thu 2/12/2009 8:01 AM
To: Ingo Goller
Cc: Stan Cruse
Subject: RE. Delamination Fix
Ingo Without the benefit of a picture or something similar regarding the condition you are referring to I cannot
determine from your email if you are asking a question, if there is an issue if you need something from us, or if you
are simply stating a fact for the record Please advise
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253.278.8105
jdugan@parametrix.com
From. Ingo Goller (mailto igoller@x[tech com]
Sent: Wednesday February 11 2009 3 28 PM
To. Stan Cruse- James Dugan, Mahlum, Jim
Cc: Weed, Terry- Diane Lenius
Subject. RE. Delamination Fix
Jim / Stan;
There is a 4' diameter ductile iron pipe mounted to the wall and tied to a PVC pipe through the slab The drain pipe
channels storm water collected on the plaza deck to the CB in the plaza garage The drain pipe should remain
accessible for maintenance purposes.
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto•igoller@xltech.com>
Ph. 360 417 3803
Fax: 360.417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From: Stan Cruse
Sent. Tue 2/10/2009 5 13 PM
To James Dugan, Mahlum, Jim
Cc: Weed, Terry, Goller Ingo, Diane Lenius
Subject. Delamination Fix
Attached is the delamination fix and beam support. We recommend that this be implemented unless you have
questions or comments that need to be addressed.
Please contact Jim Dugan if you have any questions or comments.
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 13 of 13
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse
Corporate Architect
phone- 360 850.5313
fax: 360 479 5961
scruseCparametrix.com<mailto scruse@parametrix.com>
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 1 of 5
Internet Message Novell.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: ab@brighteng.com, James Dugan, Ingo Goller
Cc: Glenn Cutter- Jim Mahlum, Diane Lenius, Tom De Laat; Bill Alton, Lindsay Murray- Roger Horton,
Tom Ellis
Date, 02/19/2009 10.36.17 AM
Subject: RE. Delamination Fix
TEXT htm
Ingo
We need definition as to drain pipe should remain accessible for maintenance purposes If the pipe is captured in
the wall there is still access to the pipe for clean out at the top of the wall as designed. The pipe cannot be
relocated, so you need to define the maintenance purposes. You should also note from the photo that the pie is
either leaking or there is water coming from the wall or the pipe is backed up, which would appear to be a
construction issue
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto•scruse@parametrix.com>
From: Ingo Goller [mailto•igotler@xltech com]
Sent. Thursday February 12, 2009 8.24 AM
To: James Dugan
Cc: gcutler@cityofpa.us, Roger Horton, Tom Ellis; Bill Alton; Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. RE. Delamination Fix
Jim,
I will search our photo file to find a picture showing the drain pipe
Also, I must remind you to not have Stan make direct contact as was requested by COPA official.
Thank you.
Ingo Goller PE
Construction Manager
Exettech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igotler@xltech.com<mai lto:igoller@xltech.com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exettech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. James Dugan
file.//C \Documents and SettmgsJheathTocal Settmgs\Temp\messages.xml 4/21/2009
Page 2 of 5
Sent: Thu 2/12/2009 8:01 AM
To: Ingo Goiter
Cc: Stan Cruse
Subject: RE. Delamination Fix
Ingo Without the benefit of a picture or something similar regarding the condition you are referring to I cannot
determine from your email if you are asking a question, if there is an issue if you need something from us, or if you
are simply stating a fact for the record Please advise
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253.278.8105
jdugan@parametrix.com
From- Ingo Goller [mailto•igoller@xltech.com]
Sent: Wednesday February 11 2009 3.28 PM
To: Stan Cruse; James Dugan, Mahlum, Jim
Cc: Weed, Terry- Diane Lenius
Subject. RE. Delamination Fix
Jim / Stan
There is a 4' diameter ductile iron pipe mounted to the wall and tied to a PVC pipe through the slab The drain pipe
channels storm water collected on the plaza deck to the CB in the plaza garage The drain pipe should remain
accessible for maintenance purposes.
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mailto:igoller@xltech.com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. Stan Cruse
Sent: Tue 2/10/2009 5 13 PM
To James Dugan, Mahlum, Jim
Cc: Weed, Terry- Goller Ingo, Diane Lenius
Subject. Delamination Fix
Attached is the delamination fix and beam support. We recommend that this be implemented unless you have
questions or comments that need to be addressed.
Please contact Jim Dugan if you have any questions or comments.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse
Corporate Architect
phone- 360 850.5313
fax: 360 479 5961
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 3 of 5
scruse@parametrix.com<mai lto•scruse@parametrix.com>
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
CML,ENGINIEIIG
s• 'LAND.SVR�vG
301 East 6th Street,Suite I
E,,
ASSOCIATES Port Angeles,Washmgton 98362
1 N C 0 R P 0 R A T E D
(360)417-0501
Fax(360)417-0514
February 18, 2009 E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street RECEW
Port Angeles,WA 98362 FEB 18 2009
SUBJECT Port Angeles International Gateway
CITY OF PORT ANGELES
Dear Mr Lierly, BUILDING NVIVON
This office has reviewed the proposed repair plan and calculations of the concrete spall under
PB-3 dated February 10 2009 from Bright Engineering, Inc. Based on the review we find the
proposed repair unacceptable with a number of issues that must be addressed Following is a
summary of the issues noted in my review-
1 The shear friction reinforcing is not placed in the area requiring shear friction
reinforcing per ACI 318 Shear friction reinforcing is typically placed to reinforce the
assumed theoretical 20 degree failure plane under a concentrated load (i.e. the area
of the spall). The reinforcing shown on the plan is placed below this area and the new
wall would be acting as a cantilever to resist the shear friction forces. Without the
shear reinforcing across the failure plane, the failure plane crack may re-occur at the
same location with the anchored wall cantilevering to resist the new wedge sliding into
the boundary between the new and existing concrete The top anchors in the
proposed design would tend to see much more tension due to the cantilever effects on
the wall and their proximity to the possible assumed failure wedge.
2. ACI 318 requires that shear friction reinforcement shall be appropriately placed along
the shear plane and shall be anchored to develop the specified yield strength on both
sides by embedment, hooks, or welding to special devices The proposed epoxy
anchorage system does not develop the yield strength of the reinforcing bars
specified It would appear that the only method to develop the yield strength of the
reinforcing would be to extend anchors through the wall to something behind the wall
For clarification, the length of the hook in the new wall shall be specified in the plans to
show that it develops the yield strength
3. The shear friction design force should also include a tension force from the beam as
indicated in ACI 318 The force would be at least the effects of the continued creep
(from over 780 kips of post tensioning)and shrinkage of the beam plus temperature
shortening as well as a portion of the vertical load The support wall with the spalling
not only has unintended partial base fixity but the adjacent 45 degree wall creates high
restraint against the wall moving with the shortening of the beam It would seem that
the minimum applied horizontal tension value used in the shear friction design may be
much higher than expected
4 The Hilti HIT 150 epoxy does not meet the requirements of ACI 318. Hilti HIT-RE 500-
SD epoxy does meet ACI 318 requirements but its capacity would not appear to
develop the tension capacity of the#6 rebar with specified bond strength considering
phi factors Calculations complying with the requirements of ACI 318(see AC308 for
post installed anchors referenced in ACI 318)shall be provided for review
Calculations shall include conditions of both cracked and uncracked concrete. Also
as referenced in item#2 above, shear friction reinforcing need to fully develop for the
yield stress of the reinforcing bar
Page 2
Port Angeles International Gateway
February 18, 2009
5. With the flexible bearing pad under the beam which does not have the rigidity of
concrete, it is difficult to imagine that the total vertical load of the beam will be
transferred through the bearing pad into the new wall, even through beam rotation,
unless there is a failure in the existing wall or end of the beam which would lead to
other complications. That said if the load does transfer into the new wall it would
seem that the load may overstress the pile cap and also induce a moment into the pile
with this loading and they should be analyzed for this loading.
Based on my review and as noted above there are a number of design issues, including possible
improper design for the shear friction forces, which need to be addressed prior to approval of the
spalling/delamination repair under P63. As was noted in my previous letter it is also my
recommendation that Robert Mast be involved in the review of the proposed repair not only
because he is one of the fore-fathers in the concept of shear-friction but also because he gave
recommendations as to the proposed repairs including a design which takes into account shear-
friction.
Please call me if you have any questions on this matter
Sincerely
Tracy Gudgel, P E.
Fc: JN 08091
ba
e
STRUCTURAL CALCULATIONS
PORT ANGELES INTERNATIONAL GATEWAY
REPAIR OF CONCRETE SPALL UNDER PB-3
PREPARED FOR: KREI ARCHITECTURE—A PARAMETRIX COMPANY
/
DATE: FEBRUARY 10,2009 BEI No. 116.03R
~Lj�r�g{�t �naneeTing In:.
1807 7m Ave. Suite 1100 1 Seattle,WA 98101 1 T 206.625.3777 1 F 206.525.1851 1 www.bdghteng.com I inio@brighteng.com
6 gjr(g4 C—ngtneermo Inc Consulting Structural and Civil Engineering
February 10,2009 BEI# 116.03R
Parametnx,Inc.
Attn: Stan Cruse,Project Manager
2IO2 N Pearl Street,Suite 301
Tacoma,WA 98406
RE. PORT ANGELES INTERNATIONAL GATEWAY
Spall Repair
Stan,
The attached calculations and details are for the repair of spalled concrete under PB-3 This is a revision to
FS-18 that was previously submitted for review
Again,please note that the new concrete wall facing is designed to carry the entire reaction of PB-3 and is
doweled into the existing wall to act compositely for load transfer should the demand be required.
Please call me if you have any questions.
B arils,
Aet,.k, SE `
07
,,- � T1. ; _� �
8 (q)
7 I- 'EPDXY'SHALL 6E HR 71 MT 150 OR APPROVED EQUAL.
! 2. CONCRETE TO HAVE COMPRESSIVE STRENGTH T 4000 ps AT 2B
DAYS
Q ^� • 1. _ . I� 3. REINFORCEMENT TO ASTM A515 Iy 60 sI.
0
! LZ LE. LE. Lp • I 4. BEARING PAD 70 BE JN INC MAS"CORD OR APPROVED EQUAL5. NON-SHRINK GROUT SHALL BE MASTERFLOW SOO BY MASTER BUILDERS
^ OR APPROVED EQUAL
q/ 4'-O 'A/ 6. DOWELS SHALL NOT COMPROMISE EXISTING WALL REBAR.DOWELS SHALL
HOOK OVER INTERIOR WR71CAL WALL BARS.
PLAN
SCALE:.314-1--0-
EXISTING SLAB
m PBJ A
1 I PLAZA EL 21' 7' t
EXISTING WALL y
REAM
9'PAD AND 9 t 2" 9"f 2' EXISTING 1
COMPRESSIBLE DIAGONAL WALL
FlLIER W
-fill
ni
DRILL BEAM FOR J/4'0IA
AJ6si'-6"DOWELS. j 5"I PBJ
ENSURE THAT Pp*IRES
AND OTHER..NOT • I
COMPRIOMISED ttt I
I
• I I i - • e
I
• I
166.2 EF PUN
NOOK TOP 1 I •.i
2'CONC
f e • • COVER
I I1
T 112 CONC
I 1 5 • • COYER
0
! DR1uE0 HOLE FOR SNUG FIT OF
DOKI ALLOW• j T
TOP OF DOWEL TO CAP FROM
16612 EF
OOL
TOP HE
OK
Ali NOOKS I I
• t
BEARTNC PAD&300 12'
j GRADE SUR (CLUE TO UNDERSIDE OF
• - I EL 70-0` - .. BEAM) -
'6 1/2'
EPDXY 3015 J-EMBED 8 1/2' APPLY CONCRETE —i/2'COMPRESSIBLE
INTO EXISTING WALL SEE NOTE 6 BONDING AGENT FILLER
REMOVE LOUSE CONCRETE
AND CLEAN SURFACE FOR `BT/= 6'x30"w/
NON-SHRINK GROUT (:)J/4"DIA x4"
• STUDS 6 iB GA
m
ELEVATION SECTION DETAIL
SCALE: 3/4" '-0' - SCALE: 3/4' V-0' - SCALE: 1/2'=V-0'
T BRIGHT ENGINEERING,INC
" J/w sh Ate, T .we•.Tom, PORT ANGELES INTERNATIONAL s�
rE E�MOE oiia rJOJ yN/wnuA 31,11 rOD
GATEWAY TRANSPORTATION CENTER
'— AFLLSNMV u _ L 6-6I !Y7] ___ ¢s SOS-QJ3-rfSr
REPAIR AT P83
t•ppAt I f5*B.a.p
6 rigkt E—nglneering Inc Consulting Structural and Civil Engineering
1809 71h Avenue.Suite 1100 J Sea Me,WA 98101 1 P•206.625.3777 J F 206.625.1851 1 info@b6ghleng.com
Date: Z.r0S By L)PH BEI No. Sheet No. / of Sheets
Subject- T Atj-9 *TEk A J
G �'"+ip i�.w�xyl n SIL GGA Spa� 4. (ci,c
fl
1 ire
O c e d
P,La (-4 JO
U,r,rA� 5r = tb -l-2� ) 7
!Lx 2(I11A
4 55 xo1��� . 23
x 112= 7 4Y
-}rI04 Qngineermg, Inc Consulfing Structural and Civil Engineering
1809 7th Avenue,Suite 1100 1 Seattle,WA 98101 1 P•246.625.3777 I F,206.625.1831 1 into@abdghteng.com
Date: By LPH BEI No. I --03 Sheet No.2--' of _Sheets
r
Subject: G3't"' � an —
F act 4
3S } $ It
t.N
_, r
/I /I
m
o
6 �rlg�1E Qnglneering Inc Consulting Structural and Civil Engineering
1809 7th Avenue, /Suite 1100 1 Seotlle,WA 98101 1 P•206.625.3777 1 F,206.625.1851 1 info®bdghteng.com
of
Dote: 2- _ By. BEI No. Sheet No. 3 of Sheets
Subject:
66,S`
L
2..(3o�-ta) �
bi ws- 4 x 3
-(k� 2 r,,t rc t4- = Asa
saro xv.o 1
LIP
61 ,9 9C—ng in eerintj Inc Consulting Structural and Civil Engineering
W
-7,othkAtvenue.Wle 1100 I Seattle,WA 98 101 1 P*206.625,3777 I F*206.625.1851 1 infoOb6ghleng.com
Dale: BEINO. Sheet No.—!t of Sheets
Subject: f O-rT
A
t,-7
2-�
®0
u
6x30-' vio" Appfoje,�
C,3 1
LCIIA
�,-'-
IN r`
�L/T
f�e"avw loos
I 57
30{,
12- LZ
}
4
S
E-(�7 I C
S
�ZTL..
LIP-
corA �-Y�
-77
�t e.rcis�tPIT
fS34�S�lDrvtlSq f
Eeis4 k ---'71
bPK
at
ti, IZ
644 honks
4�pxls 0)
rt .0
F-t__E \/ 7 ) _
err `C 1 m'} c� V a i
Page 9 of 9
Internet Message Tovell.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Jim Mahlum; James Dugan
Cc: Terry Weed; Diane Lenius; Ingo Goller
Date, 02/10/2009 05.13 16 PM
Subject: Delamination Fix
TEXT.htm
Structural_Calculat_i_ons_PAIG 021009.pdf
Attached is the delamination fix and beam support. We recommend that this be implemented unless you have
questions or comments that need to be addressed.
Please contact Jim Dugan if you have any questions or comments.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse
Corporate Architect
phone- 360 850.5313
fax: 360 479 5961
scruse@parametrix.com<mai lto:scruse@parametrix.com>
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4,121/2009
Page 1 of 3
Internet Message Novel[.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan, Ingo Goiter
Cc: ab@brighteng.com; Jim Mahlum; Bill Alton, Lindsay Murray- Roger Horton
Date- 02/09/2009 01 19.24 PM
Subject: RE. Design of Delamination Repair
e TEXT.htm
Ingo
Ade is working on the fix and has promised it by tomorrow Tuesday February 10 2009 It will be a modified version
of his original design, which will include anchoring to the existing wall by shear friction mechanism as Ade stated in
his February 3 2009 Letter which you were sent on February 4 2009 It will include calculations to support the
design. We will forward to all interested parties when we have reviewed and approve its release
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From: Ingo Goiter [mailto igoller@xltech.com]
Sent: Monday February 09 2009 1 08 PM
To- Stan Cruse- James Dugan
Cc: Roger Horton, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. Design of Delamination Repair
Jim / Stan
What is the status of the design for the repair of the plaza garage east wall delamination?Curious minds would like to
know!
Ingo Goiter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mai lto:igoller@xltech.com>
Ph: 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use,
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Claffam Zransit System (360)452 1315
830 W Lauridsen Blvd. 1-800-858-3747 WA
Port Angeles,WA 98363 FAX(360)452 1316
www clallamtransit.com Passenger Assistance:
(360)452-4511
February 3 2009 R1Dept.ofC0Mmunityl)evel()Pme!nt 0
-
FEB - 3 2009
OF PORT ANGELE
Nathan West
Director of Community and Economic Development
City of Port Angeles
PQ Box 1150
Port Angeles, WA 98362
Dear Nathan
Thank you for your work and effort towards completing the Port Angeles Gateway
Project. As the property owner Clallam Transit appreciates that you and your respective
teams were willing to consider third party opinion and input regarding the structural
delamination issue noted in the southeast corner of the facility
As you know attorney Craig Miller representing Clallam Transit, retained Bob Mast of
the firm of Berger/ABAM to provide an independent analysis of the structural concerns
and related design issues that surfaced last summer
The purpose of this letter is to notify all parties that Mr Mast's work for Clallam Transit to
make an independent analysis has been completed While Clallam Transit may request
Mr Mast to perform additional work in the future he is not authorized to participate in
any design activity
Again thank you for your continued cooperation as this project moves forward If you
have any questions please feel free to contact me
Sincerely
Terry G eed
General Manager
cc: Glenn Cutler Director of Public Works and Utilities
_ _ J
` CMI.ENGINEERING
�T j j LAND SURVEYING
Oj
& ASSOCIATES 301 East 6th Street,Suite 1
Port Angeles,Washington 98362
1 N C 0 R P 0 R A T E D
(360)417-0501
Fax(360)417-0514
January 30, 2009 E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles,WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
This letter is a follow up to my letter dated January 29 2009 in regards to the Independent
Review and Evaluation Report by Robert Mast of Berger/ABAM Engineers, Inc. dated January
23 2009 and additional issues not yet addressed by the design engineer Ade Bright. Although
there are a number of issues never completely addressed by Ade Bright, I believe the report by
Robert Mast addresses the main causes of the cracks and gives a basis to proceed with repairs
and placement of the topping slab on the project. After reviewing the report I contacted Robert
Mast by telephone on January 29 2009 to address my questions and concerns from the report
as well as verbal issues discussed in a meeting with Robert Mast on January 2, 2009 The
following are a list of my questions and concerns, excluding the issue discussed in my letter
dated January 29 2009 along with my understanding of the verbal answer by Robert Mast:
- The report made no mention of shear friction reinforcing requirements which
according to Robert Mast should have been part of the original design as he stated in
the January 2 meeting. According to Mr Mast, who is one of the forefathers in the
concept of shear friction, the design should have accounted for shear friction. Based
on my clarification phone conversation with Mr Mast, he verified that the final
proposed repair needs to be designed to resist shear fraction to provide a proper
repair for the spalling/delamination under P63 I would like to note that this issue
was brought up months ago in one of my letters to Mr Bright with him stating that
shear friction was not an issue.
The report makes no recommendation of final repairs for the spalling/delamination.
However in talking with Mr Mast, he did see in the documentation a proposed
permanent repair of the spalling/delamination but did not review or comment on the
repair since it was his understanding that the later submitted temporary shoring using
a steel braced frame was going to be part of a final design His report does go on to
discuss issues with the proposed steel shoring design and that it should be modified
since it would likely break the footing in its current location and that the diagonals
should be modified to bear adjacent to the piles We verbally discussed the
proposed temporary shoring and he feels that it should not be done because it would
gain very little and in fact would be very hard to do properly since it would be very
difficult to get the plate shims in properly to provide proper support of the beam Also
the rigidity of the proposed temporary shoring is much weaker than concrete and
would deflect under the load At this time I will not discuss my issues with the revised
temporary shoring plan recently submitted in a letter dated January 22, 2009 by Krei
Architecture since it appears another course of action may take place It should be
noted that the concept of a fail safe shoring system was proposed as a method to
allow work to proceed while Bright Engineering addressed the design questions of
the building department which have been asked and not answered over the last
several months.
Page 2
Port Angeles International Gateway
January 30 2009
- The report mentions a discussion as to the state of the existing bearing area under
PB3 and the fact that is impossible to know the exact state of the beam end encased
in the wall In my discussion with Mr Mast he states that although the condition of
the end of the beam is unknown he believes there would be signs of cracking if there
were an issue. He also verbally stated that the final repair would address this issue.
Although it was previously asked of the design engineer to provide a detail of the
actual geometry at the end of the beam and to address issues with the change in
bearing location on the beam and its reinforcing, it is the opinion of this office that this
is no longer required since a properly designed fix will address the issue based on
my discussion with Mr Mast.
Mr Mast discussed in his report that the calculations by Bright Engineering did not
show the results of the critical load state at transfer of prestress, when the prestress
force is maximum and the load case is minimum In my discussion with Mr Mast he
stated that this case should have been looked at and is probably the cause of cracks
in the soffit of beams P1311 PB12, and PB13 near the interior support columns. He
did state that placing the topping slab should help close these cracks and that in this
project there should be no long term effects from the fact that this load case wasn't
considered in the design
The report describes the cracks in PB4 and the probable cause from the termination
of the tendon in the beam Based on the report, the beam has flexural and shear
strength well in excess of what is required and this is acceptable as constructed He
did note that this type of termination is not typical in buildings and that it would have
been more appropriate to reinforce per AASHTO LRFD Bridge Design Specification
although it is not a requirement within the building code. Based on the answers
provided by Mr Mast in his report and in my conversation with him no additional
information is required on this issue It is worth noting that he recommends epoxy
injection of the cracks after placement of the topping slab to address serviceability
issues.
- There was a brief generic discussion in the report about the fact that post tension
forces transfer out to other members We discussed this issue and the fact that
some of the forces end up being transferred out to the walls and other members and
do not stay within the beams It his opinion that although some of these forces
transfer out to these other members the P T forces remaining in the beams are
adequate.
In my discussion with Robert Mast he asked about the monitoring program and
where the results were for his review I stated that the only monitoring I was aware of
was the camber monitoring that he had the information on. He stated that at this
point he did not feel that monitoring would help address the issues He did however
state that a monitoring program should have been implemented months ago to help
answer the questions.At this point it appears a monitoring program is not necessary
although I did recommend in my letter yesterday that at least visual monitoring be
performed after each topping slab pour to look for any signs of additional cracking,
enlargement of cracks or spalling.
- We also discussed the termination of the bottom reinforcing in the beams. He stated
that a straight bar termination is typical in a normal reinforced structure but that
in a post tensioned structure it is typical to.hook the bars into the wall It is my
understanding of our discussion that although they should have been hooked,
the final repair plan for the spalling/delamination which would include proper
reinforcing for shear friction would address this issue.
It does appear based on the report and my conversation with Robert Mast that the design
engineer did fail to account for all design issues, especially the effects of Contract Change Order
#4 which affected the behavior of PB-3 and PB-4 and likely led to the spalling/delamination issue
under the end of PB3 The report by Mr Mast appears to answer the cause of the cracking and
spalling/delamination and should lead to the proper design and repair of the spalling/delamination
Page 3
Port Angeles International Gateway
January 30 2009
under PB3. It appears, based on Mr Mast's analysis, that the structure will support the required
loads and be structurally adequate once a proper repair is provided for the spalling/delamination
issue. Since the report and the conversation with Robert Mast appears to address the cause of
the cracking and spalling/delamination, there appears to be no reason to ask the design engineer
to answer the questions himself I would like for Robert Mast to verify that my comments and
statements above correctly represent my interpretation of his report and the answers of our verbal
conversation of January 29 2009
This letter does not give approval of any proposed repair for the spalling/delamination under PB3.
The proposed repair including structural calculations, shall be submitted for review and approval
prior to beginning any repairs other than placement of the topping slab as per my January 29
2009 letter It is recommended that this office along with all interested parties be required to
review and approve the proposed final repair plans and calculations for the spalling/delamination
in the wall under PB3 prior to performing the work. It is the opinion of this office that Robert Mast
be part of the review and approval of the proposed final fix by the design engineer
Please note that final occupancy of the building should not be approved until any and all
structural repairs and other issues are resolved to the satisfaction of the building department.
Please call me if you have any questions on this matter
Sincere y
Tracy udgel P E.
Fc: JN 08091
11
��`was
Page 4 of 19
Internet Message Novell
S'
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: ab@brighteng.com, Jim Mahlum, James Dugan
Cc: Diane Lenius; Tom De Laat
Date- 01/29/2009 04 20.45 PM
Subject: RE. PAIG Shoring Plan Update
AR TEXT.htm
Ade
It is not a matter of contractual agreement, it is a matter of acknowledging the discussions and the documentation of
the meeting is correct. This is done all the time
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com<mailto scruse@parametrix.com>
From: ab@brighteng.com [mailto:ab@brighteng.com]
Sent: Thursday January 29 2009 4 16 PM
To. Stan Cruse- James Dugan, Jim Mahlum
Cc: Diane Lenius, Tom De Laat
Subject: RE. PAIG Shoring Plan Update
Stan,
I don't believe I can compel ABAM to sign because there is no contractual agreement between us. It is possible to ask
his concurrence by initialing the memo and to indicate his lack thereof You may want to bounce this off Mr De Laat.
Ade Bright, PE, SE
Bright Engineering, Inc.
From. Stan Cruse [mailto:SCruse@parametrix.com]
Sent: Thursday January 29 2009 3 26 PM
To: ab@brighteng.com, James Dugan, Jim Mahlum
Cc: Diane Lenius, Tom De Laat
Subject: RE. PAIG Shoring Plan Update
Ade
It would be good for the record that Bob signs off on your memo officially so we have something to support our
correspondence to City of PA ft Clallam Transit. To me that would be a signature line for him to sign and date PDF
for expediency
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com<mailto:scruse@parametrix.com>
From. ab@brighteng.com [mailto.ab@brighteng.com]
Sent: Thursday January 29 2009 3 21 PM
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 5 of 19
To: James Dugan, Jim Mahlum
Cc: Diane Lenius, Tom De Laat; Stan Cruse
t Subject. RE. PAIG Shoring Plan Update
Jim/Stan,
I just spoke to Bob and we are meeting in his office on Monday morning. I'll prepare a meeting memo after out
meeting.
Ade Bright, PE, SE
Bright Engineering, Inc.
From. James Dugan (mailto.JDugan@parametrix.com)
Sent: Thursday January 29 2009 2:08 PM
To. Jim Mahlum
Cc: tweed@clallamtransit.com, Sandie Barnhart, Glenn Cutter- igoller@xltech com; Diane Lenius, Tom De Laat, Stan
Cruse- ab@brighteng.com
Subject. PAIG Shoring Plan Update
Jim We have completed our review of the Berger/Abaco Engineers, Inc. PAIG structural report and have discussed
the report and next steps with Ade Bright of Bright Engineering. Ade will be contacting Bob Mast of Berger/Abam
today to further discuss the recommendations contained within the Berger/Abam Report regarding Shoring and to
align with regard to next steps.
The Shoring Plan submitted on January 22 2009 may or may not be amended, based on the pending discussion
between Ade and Bob Mast. At this time do not proceed with the January 22, 2009 Shoring Plan until we have
received a revised/confirming written direction from Bright Engineering.
We anticipate receiving this information no later than Monday February 2, 2009 and will forward it to you
immediately upon receipt.
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253 278.8105
jdugan@parametrix.com
file.//C \Documents and Settings\heath\Local Settings\Temp\messages.xml 4/21/2009
ids ORT NGELES
►�,_� WASHINGTON, U S A
Community & Economic Development Department
January 29, 2009
z
•
a, Jim Mahlum
: - Project Manager
F Public Works and Utilities Department
j y..
City of Port Angeles
321 E.Fifth St.
Port Angeles, WA 98362
rz Subject: Removal of STOP WORK NOTICE-Port Aneeles.International Gateway
} Dear Mr Mahlum.
�• As the City Building-Official, I am directing this letter to you in your capacity as project manager
E
and applicant of the above mentioned project. On November 21, 2008, I issued a STOP WORK
NOTICE on the Port Angeles International Gateway Facility plaza.
On January 28,2009 I.received a report from Mr Craig Miller entitled"Independent Review and
Evaluation. Gateway Transportation Center Plaza-Structure Port Angeles Washington." The
report was certified by Mr Robert Mast,.State of Washington Professional Engineer It
� e ,
�., .��>,. �s Y-,. documented analysis of structural concerns and design issues identified by myself and Zenovic
". '. '" rpt ' and Associates (my contracted engineer reviewing the.project) Mr Mast has conducted multiple
reviews of the structure and-has concluded placing of the"topping" is a reasonable course of
action. In view of Mr Mast's analysis and recommendation and upon thorough review of his
findings,I hereby remove the_STOP WORK NOTICE. I am allowing for the plaza deck to be
loaded in accordance with the attached letter from Mr Tracy Gud el of Zenovic and Associates.
At this time no occupancy shall be permitted until such time that outstanding issues discussed at
A ., the October 9 2008 meeting attended b u and other project proponents are satisfactorily
�� .:y g . by P j P P Y
`.- 'x' .resolved. A letter will soon follow-outlining those concerns that remain to be addressed prior to
occupancy
Sincerely
;. Nathan A. West,AICP
" t-
w , Director of Community and Economic Development
iA
CC. Glenn Cutler Director of Public Works and Utilities, City of Port Angeles
Kent Myers, City Manager City of Port Angeles
Phone 360-417-4750/Fax 360-417-4711
Website www.cityofpa.us/ Email smartgro`avth6cityofpa.us
321 East f=irth Street P 0 Box 1150/Port Angeles WA 98362-0217
CML ENGINEERING
LAND SURVEYING
EN OW& ASSOCIATES 301 East 6th Street,Suite 1
Port Angeles,Washmgton 98362
I N C O R P O R A T E D
(360)417-0501
Fax(360)417-0514
E-mail:zenovic@olympus.net
January 29 2009
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
I have reviewed the Independent Review and Evaluation Report by Robert Mast of Berger/ABAM
Engineers, Inc. dated January 23, 2009 which was performed for Craig Miller in regards to the
Port Angeles International Gateway Project. It is my understanding that the purpose of the report
was to provide an independent review of the cracking and spalling/delamination issues at the
project noted above This report addresses a number of the issues previously brought up to the
design engineer Ade Bright, which had not yet been answered to the satisfaction of this office or
the building department.
To expedite the process, I contacted Robert Mast by phone today January 29 2009 to get
clarification on several items within the report. The most pressing question in the report was a
statement on page 6 stating A reasonable course of action may be to go ahead and place the
topping now and concentrate on the permanent repair' which was somewhat vague as to
whether this was a proper course of action. Based on my phone conversation with Mr Mast, he
is comfortable with allowing placement of the topping slab at this time since the imposed load of
the topping slab on the supporting wall of P63 where the spalling/delamination has occurred is
only 4 kips He feels this loading can occur without endangering the structure based on his
review and calculations and that temporary shoring is not required to allow resumption of the
work.
In order to expedite the resumption of work by the contractor it is the recommendation of this
office that the building department remove the stop work order and allow the placement of the
topping slab while the final design of the spalling/delamination repair is completed It is
recommended that a condition of resumption of work be that this office, along with building
department personnel and any other interested parties perform a visual inspection after each
pour to determine whether the increase in load is causing any additional cracking or spalling. If it
is found that the work is creating additional cracking or spalling, it is recommended that the
building department retain the right to stop work until the issues can be resolved to protect life
and safety
The recommendation of allowing work to begin in no way constitutes an approval of the structure
or any proposed repairs nor does it constitute a final of the structure or a certificate of occupancy
It is recommended that this office along with all interested parties be required to review and
approve the proposed final repair plans and calculations for the spalling/delamination in the wall
under P133 prior to performing the work. It is the opinion of this office that Robert Mast be part of
the review and approval of the proposed final fix by the design engineer
Page 2
Port Angeles International Gateway
Y January 29 2009
Although not all questions and concerns have been completely addressed, it is the opinion of this
office that work may progress while the remaining issues are addressed A number of these
issues were clarified during my phone conversation with Robert Mast and a follow up letter will be
provided to your office. My intention of addressing only this one issue is to allow work to
commence without further delay since the report and phone conversation with Robert Mast
indicate that it is safe to do so
Please call me i you hav any questions on this matter
Sincerel
Tra y Gudgel, P E.
Fc: JN 08091
6
O�wA NQS
ION
of goer q,yc
REQUEST FOR INFORMATION (RFI) FORM
PROJECT NAME. Port Angeles International Gateway
PROJECT/CONTRACT NUMBER. 97-20
ORIGINATOR: Primo Construction Inc. ❑ Owner XXl7 Contractor
ITEM:
REFERENCE DRAWING OR SPECIFICATION,
DESCRIPTION OF CLARIFICATION/REQUEST
329-3/A3.06 shows batt insulation w/metal framed, plaster covered lid, where plumbing is present. There is
no plumbing under the transit building The plaster lid shown would interfere with sprinkler system and
drains. Please advise.
329B Please provide a detalf w/dimensions. It appears there is not enough room for the plumbing when
you scale the drawings on A3.06. We also need an attachment method for ceiling hangers. See photo
attached.
329C—After reviewing the drawings and specs we can only come up with 2' of insulation under conditioned
spaces of the transit building Stan's response said 6" min Is there going to be a CO or have we missed
something? Please let me know as soon as possible.
DATE REPLY REQUESTED- 1/28/09 CRITICAL TO SCHEDULE. XX YES o NO
ORIGINATOR SIGNATURE. Roland Ordona, Patsy Busby DATE. 1/22109
COMMENTS:
Insulation is called qut as R-38 thermal value. See plan sheet A3.06 Detail 3
Ingo Goller
Construction Manager
22 Jan 08
February 24 2009—The contractor is proposing to install rigid bat insulation under the stab below the Transit
Building(conditioned areas)and pipe insulation on all exposed suspended pipe. Is this acceptable?
Ingo Golfer
Construction Manager
This is acceptable, although it should be rigid board insulation and not batt insulation Insulation value
specified is R-38 under slabs which would require at least 6 inches of specified rigid board insulation.
Stan Cruse, Krei Architecture,2-24-2009
RFI Number 329 C
CADocuments acid SettingslecusestalDesk-toplGateway RFI#329 C 2-24-09.doe
O i
a RT NGELES
WASHINGTON U S A
Q 1
�v
PUBLIC WORKS & UTILITIES DEPARTMENT
Date: January 26, 2009
To Nathan West, Director of C mmumty Development
From. Jim Mahlum, Civil Engineer w-�--
Subject: Gateway Project—Krei's letter of response to delamination issue
Attached is a letter from Krei Architect and one from Bright Engineering, responding to our letters
dated, January 7, 2009 letter and Zenovic's letters dated December 3 & 36, 2008 Please review and
comment as appropriate
RECHWED
CC Exeltech Eof
6 2009
Clallam Transit
r/lt
RT ANGELES
nity Development
N\PROJECTS\97 20 Gateway\26 Claims&Liens\CED\delamination 1 26-09 letter forwarded to CED.doc
1002 SW 15th Street SW,Suite 220 Auburn,Washington 98001 telephone 253 269 1330 facsimile 253 269 6899
krei architecture
January 22, 2009
Mr Jim Mahlum, Project Manager M
E rfzk Q v
City of Port Angeles JAN 2 6 2000
Public Works and Utilities Department
321 East Fifth St. City of Port Angeles
P O Box 1150 Public Works and Utilities Dept.
Engineering Services Divisioa
Port Angeles, WA 98362-0217
Re Port Angeles International Gateway
Jim,
We have completed our review of the January 7, 2009 response by the City of Port
Angeles and the Building Official's consultant and are providing the following solutions
and recommendations for completing the plaza deck loading and repair of the
delaminated wall under PB3 Attached is Bright Engineering's response to items of the
Zenovic & Associates letter dated December 3, 2008 and December 26, 2008
Based on Bright Engineering's response we are reissuing the shoring design for
immediate fabrication and installation. Once the shoring structure is in place, we will
require inspection prior to plaza loading. The final design solution for the delaminated
wall and beam bearing support will be provided once the plaza deck loading is in place
and it has been determined that structural movement is mitigated or at a minimum.
We previously provided our recommendations regarding the crack and movement
monitoring plan as requested by the Building Official. We have no additional comments
and recommend the City of Port Angeles proceed as proposed.
This package and the previous documents and calculations provided by the Structural
Engineer of Record complete the response to outstanding questions. If additional issues
remain,please provide an itemized list. Please call if you have any questions regarding
this letter or response by Bright Engineering.
Sincerely,
Jim Dugan, Senior Project Manager
Krei Architecture
Cc Glenn Cutler
Terry Weed
Sandie Barnhart
Diane Lemus
Tom De Laat
Attachments Bright Engineering letter dated January 19, 2009
Bright Engineering Shoring Design dated January 20, 2009
-Pnght C—ngineertng Inc_ _ _ _ Consulting Structural and Civil Engineering
January 19,2009 BEI# 116.03R
Parametrix,Inc.
Attn: Stan Cruse,Project Manager
2102 N Pearl Street,Suite 301
Tacoma,WA 98406
RE. PORT ANGELES INTERNATIONAL GATEWAY
Response to Zenovic&Associates,Inc.Comments
This letter is to respond to Zenovic&Associates comments dated December 26 and December 3,2008
Item 2. We do not agree with Zenovic s comments about lateral torsional buckling of the brace/channel
The shoring system we proposed is self-supporting triangle system and virtually no load is carried
by the columns.This is basic structural mechanics.
Bottom gusset was intended to be YV and has been corrected.
Tie bolts have been added to the braces.
Item 3 a,b&c) First,Zenovic s comment in regard to change in shear and moment at the end of P133
caused by moving the shoring frame inward is trivial and baseless. The frame is designed to
support total reaction at the end of the beam,therefore maximum shear in the beam remains
unchanged.The shear reinforcement that is provided is satisfactory by inspection. Secondly,the
perceived negative moment on PB3 will not develop unless the supporting wall completely
collapses. In that case,the proposed frame was designed to support all the loads. Even then,the
magnitude of the negative moment is small and proportional to the load on the 19' overhang.
There are sufficient conventional top reinforcements to satisfactorily carry the load.
d)Our calculations show a bearing of 431n''is required under the base plate to support the vertical
reaction. We provided 168in`which is,by any reasonable judgment,more that sufficient.
Items 4&5 It is our professional judgment that it is irresponsible to design a so-called `fail safe support
frame that is intended to prevent the perceived catastrophic failure described by Zenovic&Assoc.
and to then allow the loaded beam to"drop"onto and be `held' by the support. We do not agree
with this concept. Our design asks that the beam be snug with the supporting structure which can
be accomplished by specifying driven shims. We have added a note to symmetrically place the
shims.
Regards, .i'rt `'� a f'f ,►,
Ade J Bright, PE, SE �`SfONAL
4tY AC iOc I jr d. `xi't ,��.� H. --i-- E.... 7^ iu' — --
STRUCTURAL CALCULATIONS
PORT ANGELES INTERNATIONAL GATEWAY
TEMPORARY SUPPORT FOR PB-3 REVISION 1)
PREPARED FOR: KREI ARCHITECTURE—A PARAMETRIX COMPANY
1. SRI
f �Vs`CIVAL
DATE. JANUARY 20,2009 BEI No. 116.03R
-
�rg�t �neineering Inc
-- -1804-7"'Ave.-Suite-1100-I-Seattle,-WA--48101-1-T 206:625:3777-1-F•206:625:1851-1-www.bdghleng.com-1 in[o@bdghteng:com---— - —
6 right QngmeEmng Inc. Consulting Structural&Civil Engineering
1869 r Avernae,Suile 1100 • Seattle.WA 88101 • (206)625-3777 • Fax(206)625-0185 • inb@bdghleng.com
+ n elQS 1p\�t, nel-h�a1 6ejb PPOIECTNO. S6«t
SUBJECT it n ® 3 DATE BY
00
r
r,
'r ire d cen d
:NNk�-e V, �
�+ •
r
� L4
• • f3rigk.=ngineering Inc. Consulting Structural&Civil Engineering
1609 7"Avenue,Stile t 100 • Seattle,WA 98101 (206)625.3777 • Fax(206)525-0185 • info@brighteng.com
-d'jtj!2226lej 7lw,�,4e,-A o,-- C�fec�w .uojECT No. .t
N,
SUH]GC[ DATE 11—AT-,C;7 BY j
s'
s�
ILI
'r lo BeAr^
C7
MAX
� .
.r,
,�--
,
ca 01
?� Ur
foiq
1
"9X
t
6 Bright gngmeering Inc. Consulting Structural&Civil Engineering
1 809 T'Avenue,Suite 1100 • Seattle,WA 98101 + (206)625.3777 + Fax(206)625-0185 • into@6righteng.corn
l c a "oma) C�� ^� PKojr=cT No. N,
SUBJECC DATE BY °3
d.
11
�1
rf t' W- d Z
M
104 �p Ilk
�d
6 Bright Qngmeering Inc. Consulting Structural&Civil Engineering
1809 r Avenue.Suite 1100 • Seattle,WA 98101 • (206)625.3777 • Fax(206)625-0185 • info@bthierig.com
t Q; r vv i1K'1 one C?,�1 7p G1/b PRoJECr No.
SUBJECT DATE /,;Z By E
�► - �, OC/
I . . 19813
7
C
FLCT4
VE I L.- I
q 400
ID RW s . L. g
a
5TIV r- YL
F.
EA C-1 cn $a-L.
Ts; Tjp ri.
Jit
� rlL-
� ° t
- I:
6 [3rilakt E—ngineering Inc. Consulting Structural&Civil Engineering
1609 7°Avenue,Suile 1100 • Seatlie,WA 98141 • (206)6253777 Fax(206)625-0185 inb@bNhteng.com
ect
\I,l i�l ti PxojEcr No. sNm
SUB ECT DATE "' v
1'. 70 ,07
r0
3"I►4'/�
C.t -GSR.
.5x5
Gl2x K 3'-O`� PV tel•
'► , 11 y. .
vp
r• Lr/•� ~ f
f
ATN
o NJ
�K A� �1 sl ?AL
+ L `
Consulting Structural&Civil Engineering
6 �rig�t�ng�neering Inc. 9 9 9
1809 r Avemm,Sudo 1100 * Seattle.WA 98101 • (206)626.3777 9 Fax(206)625-0195 • info®6dghleng.com
PPo»cr No. sh«t
N.J't
SUBJECT DATE 1/"p't S�(� BY S�'•�
t
4 L5 � .
/b, t)1 , "F
_�
Y4
t OU 11�
SSION LG . (►
5'
V
3
D I'L-.. 3
r- �
1
I
I �
T_
I �
s
.Y
cr
tl
I'---�y WIDEBRACES <6"
g�•Qt
FOR BRACES DIM TO CG.S.
6 WIDE
BAK LEGS
GeAG( I USE FILLER CS
UNO I I A5 REdo
IZIL
CIP
USE STANDARD
I I GAGE DISTANCE
! f fyp
2"p4l
Z4 I1
I STANDARD GAGE DISTANCE
j Q LEG
LENGTH 9' 7� 6" 5- 4' 3/2 3"
I SPACERS REO'D q 4.5 4.0 3.5 3.0 2.5 2.0 175
1 AT CTR OF BRACE 9
SPAN WHEN CROSS q? 91 30 2.5 2.25
BRACING DOES HOT
EXIST USE 1!4'/ qt F.I. 3.0 2.5
GUSSET ! A49OF BOLTS W/
THICKNESS STD SIZE HDLES
NOTE* ALL BOLT HOLES IN BRACES ARE STANDARD SIZE HOLES.
ANGLE BRACING DETAIL 4
t Nn S C-AL '
CIVIL ENGINEERING
L!',��O V I� � LAND SURVEYING
jY
& ASSOCIATES 301 East 6th Street,Suite 1
Port AngelesMashmgton 98362
I N C O R P O R A T E D
(360)417-0501
January 26 2009 Fax(360)417-0514
E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway—West Parking Garage
Dear Mr Lierly
This office has reviewed the response letter dated January 23 2008 from Robert
Bourdages of Poggemeyer Design Group concerning my letter dated December 19
2008 and my email dated 1/23/2009 Based on the information provided by Robert
Bourdages, it is the opinion of this office that the cracking issues have been adequately
addressed and the structure is safe to open for use from a structural standpoint.
A copy of the letter and calculations from Robert Bourdages is attached It is my
understanding that the original wet stamped version of the letter and calculations will be
provided by Primo Construction
Please call me if you have any further questions on this matter
Sincerely
Tracy Gudgel P E.
Fc: JN 08091 o�w wNQ
R EC" E � W E
D
JAN 2 6 2009
CITY OF PORT ANGELESSslor��-
Dept.of Community Development
1901ci
S—' a C_P tM
POGGEMEYER
DESIGN GROUP
January 23, 2009
Mr James Bartee
Owner
Primo Construction, Inc.
970 Carlsborg Road
Sequim,WA 98382
Dear Mr Bartee:
RE. Port Angeles International Gateway
West Parking Garage
Port Angeles, WA
Following some final concerns by Mr Tracy Gudgel, P E. of Zenovic&Associates.(email of 1/23/2009),
we offer additional commentary regarding the hand calculation of 1/7/2009 relating to beam strength.
The hand calculations demonstrate adequate shear and flexural capacity of the beam at the critical
section above the short concrete shear walls, in the negative moment region.These beams have a
shorter span than the typical beams where no shear walls occur
Shear strength was checked using ACI 318-05, equation 11-9. If more refined equations were used,the
demand/capacity ratio would improve.This was not necessary because equation 11-9 demonstrated
adequacy
Hand calculations are provided only as a check on the finite element model The model shows the critical
cross section to be adequate for strength.
Any cracking in the vicinity of the region investigated has been noted to be hairline in width,thus the
calculations are valid " " �.,
p etr►`;� ;ti
Regards, �j�' Of WASP 4C
o yew �r C(P
(a
N
1
yrs foINAL
Robert Bourdages, P E., Principal 1/j0
Poggemeyer Design Group, Inc. {.
'17
512 6th Street South,Suite 2021 Kirkland,Washington 98033 1 P 425.827.5995 I www.poggemeyerxom
POGGEMEYER DESIGN GROUP Made by W
Date Job No.
CONSULTING ENGINEERS Checked by Date Sheet No.
512 Sixth Street South,Suite 202 Kirkland,WA 98033
14251827-5995 Fax(4251828-4850 Description C,t-_
LIM
Job Name WeA ��(,y(
t-C-t +
�►� d. � mB�sab� a Z�,.g"
r
IN}L'k„
�v
G� Ar n
(ss' -r 'J �' N 'f 4 tit 2 j Z"
SS4IL
t-Q*
1
u-
1 J
In
s Ik Bou
v5 Q fin�� k Kms,) z�•�" S� (v o ac�N
s `_may
t!-
uw = Vc, S.
,c�FG75� GCC'
POGGEMEYER DESIGN GROUP Made by Date lob No.
I Q
CONSULTING ENGINEERS Cheri ed b Date Sheet No. �l
512 Sixth Street South,Suite 202 Kirkland,WA 98033
14251827-5995 Fax 1425)828-4850 Description
Job Name
Y�
Q.= fps
o.gsb�r
V cJ N
r'�L� �i• �� � r N
�' ? a74
Q� ►s , � i 7 v,!f3�, _ m v� S31
2Zj"
v'9 Z10
p VA
z ll bf it v^ c4v remuwi
1 (,
Made by Date j 0# Joh No. O n
AOGGEMEYER DESIGN GROUP 7
CONSULTING ENGINEERS [herded try Date j Sheet No.
512 Sixth Street South,Suite 202 Kirkland,WA 98033
1425)827-5995 Fax(425)828-4850 Description r
C.r1w d
Job Name
tq'o,�
23.7 20.8 22.8
—
_.. — - 22:5..._ _. ? r i 1-21.3 ....._ b 22.2
co
,•!
Q ! I CD
m1 I � I I T I I
I I I I ! I
I I I
CD I I CD I I I I
I f I I I I
7,
r 9 o I
c I I I I I
I I I I I I f
I I I I
I m I I I I
I
C;
" I I I I
I I 1 I
A A A n
. 70.2 N---� 57.9 4.5•77.5 1 r..
to t-
C) I i o a Ir I c
I
to
w I I In cn I I I I
C?
I f I I
I I i I I I
I L'.
•- I I N I I I I
I I 11 I I
n ! I r to f c�
N '- I I p
N
I
...................................................
1
M q�
IM1 r
a Y
I n
a
8 8
a �
d a
;Y Y
H
h h
I�
I■
1111:............i..-n...-----••-----•-]•"---•-�---^
I
tl7 f:1
I w w
r
Record of Communication
Staff Member Name —1 I Date
Name of Individual Contacted.
Subject.
Issues discussed.
1)j� L /*
ff o. S
r +
LL4-
� � S
�✓GLe� rpt ee c' � Pc
Esdd-
S
CITY OF
POIRT
G f T r ii
W A S H I N G T O N, U S A
February 6 2009
TO Primo Construction
Jennifer Howell
FROM Jim Lierly Building Inspector
City of Port Angeles
RE Gateway garage west Final Inspection
An inspection was performed on 1/22/09 at the�west garage of the
Gateway transportation center The following items are required before
occupancy in the west garage can occur
1 The exit sign on the south lower parking area shall be visible as per
the 2006 IBC
2 The stairway at the south lower end of the garage shall have an
emergency light, as per 2006 IBC
3 It is unclear as to where the ADA parking spaces are to be located
4 The non ADA spaces do not meet the intent of the parking
regulations as set forth by the City of Port Angeles Revised plans
must be submitted for approval
5 It was discussed that the turnaround (hammer heads) should be
delineated So that parking will not occur in the space designated for
maneuvering
6 Structural concerns are being addressed and will be made available
once received
Jim Lierly
Building Inspector
360-417-4816
360-808-0534
jlierly(a)_cityofpa.us
Stan Cruse
January 15 2009
Page 2 of 2
Once again,the continued trivial comments and editorials by Zenovic and Associates are unprofessional and
are causing unnecessary delay and cost to this project. As the Structural Engineer of Record,I question the
professional qualifications of Zenovic and Associates in reviewing a structure of this complexity They have
thus far disregarded the opinion of a number of reputable Structural Engineers. Since we, and not Zenovic
and Associates, are professionally liable for the performance of this structure,we stand by our design
regardless of Zenovic and Associates speculative opinion.
Please call me if you have any questions.
Regards,
B11
Ade J Bright,PE, SE
SAL
Page 1 of 8
Internet Message Novell.
s
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Ingo Goller
Cc: Jim Mahlum, James Dugan, Bill Alton, Lindsay Murray Roger Horton, Tom Ellis
Date- 01/13/2009 11 56.45 AM
Subject: FW P.A. International. Gateway Letter confirming conformance for CO Sensor
TEXT.htm
Ingo,
Susan Smith s comments are below acceptable to use 35 ppm. Is this what you are looking for?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
From. Susan Smith [mailto:scs@treswest.com]
Sent: Tuesday January 13 2009 11 50 AM
To- Stan Cruse
Cc: James Dugan
Subject: RE. P.A. International. Gateway Letter confirming conformance for CO Sensor
Stan,
We will accept 35 ppm as the operating point for the fan.
Please let us know if you need anything further on this.
Thanks,
Susan C Smith
Tres West Engineers, Inc.
2702 S 42nd St, #301
Tacoma, WA 98409
253-472 3300 x131
253-472 3463 F
253 312-6054 C
From. Stan Cruse [mailto-SCruse@parametrix.com]
Sent: Tuesday January 13 2009 9.09 AM
To: Susan Smith
Cc: James Dugan
Subject: FW P.A. International. Gateway Letter confirming conformance for CO Sensor
Susan,
Please review and comment.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 2 of 8
scruse@parametrix.com
' From. Ingo Goller [mailto•igotler@xltech.com]
Sent: Tuesday January 13 2009 9.05 AM
To Stan Cruse- Robert Kugen, James Dugan
Cc: Roger Horton Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: FW P.A. Internationa. Gateway Letter confirming conformance for CO Sensor
Jim / Stan,
Attached to this forwarded e-mail is a letter from Control Contractors dealing with the calibration of the carbon
monoxide sensor in the plaza garage Is this sufficient?Based on the letter the sensor is set to turn the fan on a
35ppm concentration and turn the fan off when the concentration falls below 35ppm. Plan sheet M1 01 calls out for
the sensor to turn the fan on when the carbon monoxide concentration is at 50ppm and turn the fan off at 25ppm
carbon monoxide concentration
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igotter@xltech.com<mailto:igoller@xltech com>
Ph. 360.417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exettech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all tosses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From. Patsy Busby
Sent. Fri 1/9/2009 12.46 PM
To- 'Ingo Goller' Bill Alton
Subject. FW P.A. Internationa. Gateway Letter confirming conformance for CO Sensor
From- dennymsm@comcast.net [mailto dennymsm@comcast.net]
Sent: Friday January 09 2009 10:43 AM
To- Ordono, Roland
Cc: Busby Patsy
Subject: P.A. Internationa. Gateway Letter confirming conformance for CO Sensor
Roland,
Attached is the letter for the CO Sensor confirming proper installation as requested by the owner
Thank You,
Denny Brown
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
R E C V E
, ,N JUN 111009
CITY OF PORTA►l Fib; .
Dept,of Commnrutyr0eNelopmEi
January 8 2009
Port Angeles International Gateway
Lower-Level-Parking-Garage Carbon Monoxide Sensor-/Exhaust Fan Test
To Whom It May Concern.
In June of 2008, Control Contractors, Inc installed a Vens Industries Model G Carbon
Monoxide Sensor per specification note 14 on mechanical drawing Ml 01 (See cutsheet
below) It starts and stops fan EF-7 to remove harmful carbon monoxide from the parking
area.
The Device Engineering Specification quotes "The G Series devices are equipped with a
relay contact that closes when CO level is below 35ppm and opens when the CO level is
above 35ppm." Control Contractors Inc wired EF-7 to start and stop from this relay
contact.
On Sepember 29 2008 Union Electrician Ted Dahm of Control Contractors Inc called
Veris Technical Support to verify installation wiring and operation of the CO sensor The
sensor is factory calibrated Ted then verified operation with the inspector The inspector
saw proper operation and signed it off as accepted.
Sincerely
Darin Veach
Operations Manager
Control Contractors, Inc
C David VanVolkenburg—Control Contractors, Inc Branch Manager
Control Contractors, Inc.
1128 Poplar Place South
Seattle Washington 98144
Phone.206.328 1730
Fax: 206.328.0829
coNTROL
am
Page 2 of 3
INfSiV f1LEPtOWN Carbon Monoxide Sensors
MOUNtS LitRfCRY TO CONWIT
r
GSeries car bon rrr_noxidesensors na;sinimenergy lTyhacmraryartJstabifity
—.--- ------- =-s&Arigs,%04-ersuring optimal ventilation..the ■ r rorQsormrttrolled:hgh'aceracy,
Gtf' sntsasa9Dw,., ttdationsysoemstobecordroNedby excellentstabifity
theamourttofCOpresentinalocatiorLTte(,SeOes ■ Nocalbrationrequired-easy inaintenarKeand
i derectsfluchutionsinCOleels,and itsignalsaa w-ry-heeopesaticn
systems to provide aninlet othestl air oomal forth 1
f _ t ■ etal®cidtserroconducta(tAd3►sYtsot
.r.trn rash.
space atagiven time.inthis ntamrer,[tie venddation
iawy-I fan dies not need to mncmdmuatstf sawing energyL@rsa(dewrl)rrthFovpa�afarap�r8mtioas
and reducing maintenance coas.It there isanexcess
CO level in a kxatiun the G Seriesw 6 alert those in ■ Lrdertace to DDrsystem W parel,a direct
fancordral
the area with both anaudible and a vbmlalarm
■ Onboard relay for directventiLationfan contral
• fhtt5eriesdevicesareequippedwidiarelaycontact ■ Selectableoutput:4--2OmAorIJ5V!040rlDCfcs
thatdoseswhenCOlevelebelow35ppmandc}ens operationfledbiity
♦ "'�.__� when the CO kRl is above 35pprn Removal of the
sensor,interruption ofpvrer,arcut,Ares cause the Watff&ommn6olinparkfnggemgesfor
relaycircuittoopenand start thefan.Minimumrelay eneryysovings
exie time is 3 nnmtes toprevert fan biwit-c crag. ■ 5-year,{rung-fife replaceable sensor element
5A�4 ■ frdeifacetomnwlsstemvia4-dhnAor(}-5;()-
4udibleAHrm SSdRadannseurdsifCDle'relrises y
above 100ppmfor 30rninuteas. ICOVDCoutput
■ fad-safealarm relay handles Samlafor direct
APPLICAnoNS fannmrdrol
3 ■ (onbollirgparkinggarage:.tndtaticn ■ Audibleexpc)mreaL-imlOOppm30rretmtespei
l ■ Ensuring OSHAairquality compliance in 61204-rtsy aoobkst atirg
¢ ® J (otrmercialbuildings and fatuies
SPEORCOONS X Series Sensor)
- IrputPower 12-'•OdOC'?eytr,ii+A�L7lC,0 `�?yn
Sensor Digi illy-profiled M1M1e�i Oxide Szmkonducror(btOS)
Sensor tife 54yeas,,oical,wplaceable
GM.xAMonitoring Station DetectlonRange 0 to 20nppni
Analog Output >viresourdn14-lcrnkoras voltagel
the G&A moritoringstattalannndigitalinputs outputscaling Us -wlectaLl 1100ppnES 200ppmI.'
from up to fomscrtsorsto provide alarmstatus Response Time 2 minu Fes30 second sample interval elcle
indication for each(hanndardaForm COOT) Relay Output N.O.F,rnA0'-:FA@3UjC/vDC(Use,ath rcon[zttod
fanaLtuationrelay.IfanyofthesesorsdelectsCO Relay Setpoint 35opm
hroelsabove 35ppmaifafault isdetected,the High LimitSetpoint 100ppm`or'Ominutes
cpriesponditgalarm statusindiratdfightsardthe HlghlfmhUarm Audible,35d.B, sets below 100opm;(Solid-sr3tecontact ie-ASveraon)
fart de-e e5HighLionitContactI-ASmodels) 250VAClD(,12OrnArnv-8..350
�� }" LED Indicators Noma l=Green;(alforvendiadondred;High-Iimil alarm=llashingRed
OperatingEmironment -2(ftoSO°r1-4' 122*F);Ozo9O%FN on-condensng
To VD(nrscm Co age 5000:q.(L typi,al(405 sq.m)
l (apmat Physical whip powder coat over steel
�tiav ra ® RA SPEOFICAAONS(GAW Monitor)
1 M u t5'awvefla
1 Input Power 4VACrV0C0.A
t rryirdlrzcm)htirr yppyAopo,K Inputs Detectconta, dosnelromsensor rel ayFour channds.n4UDC!000
Output F»rm"{SFtJI)rol rya S S�s'Gy qr
Alarm Indicators Fdu 10mm Red tEDindi:ates alarm status
Ur+.Ct.tlxrrarmdfri crs`p'" cg:and dckAranphcrsc Powerindicator
Gre�LEG;india[espr erArpptyncwadon
prbagara2acadrerce�`' Operating Envi onment 2G to 5rr'l-4*to 122'1`k 0 to 3101S RH non-ccndensinq
Physical NEW 4metal endows white
'1
Control Contractors,Inc. Y —
1128 Poplar Place South
Seattle,Washington 98144
Phone 206.328.1730
,�., Fax: 206.328.0829
J
u0N I ROL
Page 3 of 3
APPLICA71OWWRING DIAGRAMS
GDiblY GPrf
(O1TCH FAX
MWEt KWEP.
o-irtrn-sv sal_oa
0
4�21H 4-2w
Da[ ®M -SMEA OUTPUT ropraa fft - rau- - - -- -- - - -- ---
POIYEA POWER
I
Out OSVilgl rd-20mA
M L0P141iTiR
IWV-15-tlr0 :4YA[ ��'
( � (OMUn `FO:G]L SEX•.i.A
R
li.u.Relay ��`"�WW" �y xc� 6m�ieaeHt .}
p.a.Relay GWA Ya+ 0
4.,tMONNG eme
01to9yWlalAiCtM
STJ;TIJIN w xr�ls�;awx
wn u c
15'DlDC
L Y !2
24UA[
ID� •m
fftt
n�Jlnpu
z,M1w�n
i
DIMENSIONAL DRAWINGS
6t✓+"iW GM
09'dia a C11
2_mmJ7oi-,.
GNIAPJUgMOgqW
2 s ( 2 q, AIOIOrO[
x(63 mm'r~� f(Ss mm)
o O
e yr A O 65'
Q (166nnOE
q. q Q
Ilgmml 002 mm)
LI) j.. .
0"(127rnm105,
{733
mm?
1.25
(s7 mrnj
f
Sensor Monitoring Station
£love Output AW621yAWimOarpur USorfU serm ly=GW0..6
Gm 4 0
O=Dic[momt Y=F,dd- klabl,, A=hdwy[onlad =Slantlard Gz O=Slab Only
W=Wall noun .4Wun"Ag 1=1
M=4-20mA Smdon 2=25-
A=Relay mly Y=?Se
4=4
F..mnrlr F:am;d¢• ACCESSORIES
❑Q ❑ Yrr,ccE.pimForaanenrselsod rote E78.
f + V 4 5 GM 40 A P^.rersucp5�:Feraormcler; eduOa;Jennao5e�au,�h
PSSedesonpage 187
Control Contractors,Inc.
1128 Poplar Place South
Seattle,Washington 98144
Phone.206.328 1730
-Fax: 206.328, M _ __ �.
Page 1 of 4
You replied on 1/13/2009 1.20 PM
Ingo Goller
From: Stan Cruse [SCruse@parametrix.com] Sent: Tue 1/13/2009 11 56 AM
To: Ingo Goller
Cc: James Dugan,Jmahlum@cityofpa.us, Tom Ellis, Roger Horton, Bill Alton, Lindsay Murray
Subject: FW P.A. International.Gateway Letter confirming conformance for CO Sensor
Attachments:
Ingo,
Susan Smith's comments are below acceptable to use 35 ppm is this what you are looking for?
Parametrix
w*wd
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax 253 752.9865
cell: 360 710 6425
scruse@parametrix.com
From Susan Smith [mai Ito.scs@treswest.com]
Sent: Tuesday, January 13, 2009 11 50 AM
To Stan Cruse
Cc: James Dugan
Subject: RE P.A. International. Gateway Letter confirming conformance for CO Sensor
Stan,
We will accept 35 ppm as the operating point for the fan
Please let us know if you need anything further on this.
Thanks,
���_ http.Hmail.xltech.com/exchange/igoller/Inbox/FW %20P.A.%20Intematlonal %20Gatewa. � 1/13/2009
Page 2 of 4
i
Susan C Smith
Tres West Engineers, Inc.
2702 S 42nd St, #301
Tacoma, WA 98409
253-472-3300 x131
253-472 3463 F
253-312-6054-C
From Stan Cruse [mailto SCruse@parametrix.com]
Sent:Tuesday, January 13, 2009 9 09 AM
To- Susan Smith
Cc: James Dugan
Subject: FW P.A. International. Gateway Letter confirming conformance for CO Sensor
Susan,
Please review and comment.
Parametrix
iarejlzvred#*& — aaofz and a — m a d4rzemce
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax 253 752.9865
cell: 360 710 6425
scruse@pararTietrix.com
From Ingo Goller[mailto igoller@xltech.com]
Sent:Tuesday January 13, 2009 9 05 AM
To: Stan Cruse, Robert Kugen, James Dugan
Cc: Roger Horton,Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa us], Lindsay Murray
http.//majl.xltech.com/exchange/ic,oller/Inbox/FW %20P A.%20International %20Gatewa. 1/13/2009
Page 3 of 4
Subject: FW P.A. Internationa Gateway Letter confirming conformance for CO Sensor
Jim/Stan
Attached to this forwarded e-mail is a letter from Control Contractors dealing with the calibration of the carbon
monoxide sensor in the plaza garage Is this sufficient? Based on the letter the sensor is set to turn the fan on
a 35ppm concentration and turn the fan off when the concentration falls below 35ppm. Plan sheet M1.01 calls
out for the sensor to turn the fan on when the carbon monoxide concentration is at 50ppm and turn the fan off
at 25ppm carbon monoxide concentration.
Ingo Goller, PE
Construction Manager
Exeltech Consulting, Inc.
116 Wes,8TH Street,Suite 120
Port Angeles,WA 98362
Boller_ ltech.com
Ph 360 417 3803
Fax 360 417 3097
Sustainable Engineering Solutions for a Changing World*People, Not Companies, Deliver Projects
Disclaimer The attached files and/or text within this e-mail message are the property of Exeltech Consulting,Inc.Reuse of the files for any other
purpose without authorization is strictly prohibited.Exeltech Consulting Inc.shall not be held responsible for any and all losses,claims or liabilities
associated with the unauthorized use interpretation or modification of the files or text.
From. Patsy Busby
Sent: Fri 1/9/2009 12.46 PM
To. 'Ingo Goller', Bill Alton
Subject: FW P.A. Internationa Gateway Letter confirming conformance for CO Sensor
http.//mail.xltech.com/exchange/igoller/Inbox/FW %20P A.%201nternational %20Gatewa. 1/13/2009
Page 4 of 4
From dennymsm@comcast.net [mailto dennymsm@comcast.net]
Sent: Friday, January 09, 2009 10 43 AM
To Ordono, Roland
Cc: Busby, Patsy
Subject: P.A. Internationa Gateway - Letter confirming conformance for CO Sensor
Roland,
Attached is the letter for the CO Sensor confirming proper installation as requested by the owner
Thank You,
Denny Brown
http.//mail.xltech.com/exchange/ic,oller/Inbox/FW %20P.A.%20Intemational %20Gatewa. 1/13/2009
t �e^ • • • �.rte.
A L �
Deficiency Report
PROJECT Port Angeles international Gateway DATE:9/25/2008
LOCATION: CONTACT Patrick Pestana
PROJECT#:2007-422
No. .N.an e/Area Status. Ddidency Lame Action' .. .',."Date . P.erfltirmed By
1 AHU-01/Inlet-02 Fixed Ductwork connected to Created 24-Sep-08 Patrick Pestana
supply system. Recheck
Rm-9 Type:Mechanical Problem Fixed 25-Sep-08 Patrick Pestana
Assigned.Patrick Pestana I Accepted
Comments/Signature
-—2--AHU-01-/-Oudet-05- — -- —-i Fixed--Ductwork connected-to--- —Created——24-Sep48 Patrick Pestana
exhaust system. Recheck
Rm-9 Type:Mechanical Problem Fixed— 25-Sep-08 Patrick Pestana
Assigned:Patrick Pestana Accepted
Comments/Signature
3 EF-05 Open This is a direct drive Mn the Created 25-Sep-08 Patrick Pestana
speed control has been set Recheck
at its lowest setting. Fixed
Assigned:Patrick Pestana Designed for 55 cfri%actual
70 cfm(127%of design Accepted
airflow).
Type:Not Assigned
Comments/Signature
4 EF-06 Open This is a direct drive fan the Created 25-Sep-08 Patrick Pestana
speed control has been set Recheck
at its lowest setting. Fixed
Assigned:Patrick Pestana Designed for 150 cfm,
actual 265 cfm(177%of Accepted
design airflow).
Type:Not Assigned 1
Comments/Signature
5 EF-07 Open This fan is presently Created 25-Sep-08 Patrick Pestana
running above design Recheck
airflow a sheave change Fixed
Assigned:Patrick Pestana would be required to obtain
design flow. Designed for Accepted
22,000 cfm actual recorded
from duct traverse 26,850
cfm(122%of design
airflow).
T :
K-Assigned
Comments/Signature
.N_eudorlerEngineers,.lnc
Preliminary Report
;r
ti; Page 1 of 2
Bill Alton
From. Stan Cruse [SCruse@parametrix com]
Sent: Monday October 27 2008 1.37 PM
To Bill Alton
Cc Susan-Smith James Dugan, Jim Mahlum' Ingo Goller
Subject: FW' HVAC Deficiency Report
Bill,
I assume the following were the responses you were looking for more questions for you!
Parametrix -
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax 253 752.9865
cell: 360 710.6425
scruse@parametrix.com
From Susan Smith [mailto:scs@treswest.com]
Sent: Monday, October 27, 2008 1 35 PM
To: Stan Cruse
Subject: RE. HVAC Deficiency Report
Stan,
I am not certain to what items 1 and 2 refer Was a supply diffuser connected on the return side,and a return connected to the
supply side,and these have been corrected?
For items 3 and 4 were the readings taken with their respective room doors closed?I would like to have these rechecked with
the doors closed.
For item 5,the extra airflow is not detrimental to the garage. It will however affect the sound levels above,and adds pressure
into the exhaust louvers. The sheave should be changed.
I assume these are the exceptions they found during balancing?Where is the rest of the balance log?
Thanks,
Susan C Smith
Tres West Engineers, Inc.
2702 S 42nd St, #301
Tacoma, WA 98409
253-472-3300 x 131
253472-3463 F
253-312-6054 C
From. Stan Cruse[mailto SCruse@parametnx.com]
Sent: Wednesday October 22,2008 9:52 AM
To:Bill Alton
Cc:Ingo Goller- Susan Smith
10/27/2008
f
SPEC SECTION 15950
NEU®ORFER ENGINEERS, INC.
SUBMITTAL
PORT ANGELES INTERNATIONAL GATEWAY
PORT ANGELES, WASHINGTON
APPROVED
NotedBy
�As
o` er n9' (Q. AUG 2 1 2001
a '= Tres W
est Engineers Inc
y Approval applies to Manufacturer only and does
Z not relieve the Conlractor�S�ppiier from the
WILLIAM C.NEUDORFER restpoensibflity of meeting all applicable
CERTIFICATE 4 ments of the Plans and Specifications
2465
1170 REPUBLICAN STREET 1500 NE SANDY BLVD STE.#1 PO Box 24293 MPO 614 4TH AVE. E.
-SEATTLE, WA-981.09— ---PORTLAND OR 97232 BARRIGADA, GUAM 96921 OLYMPIA,WA.98501-
PHONE (206) 621 1810 PHONE (503)235-8924 PHONE (671)637 7810 PHONE(360)528-8694
FAx (206) 343-9820 FAx (503)235-8925 FAx(671) 637-7842 FAx(360) 528-8695
NEUDORFER ENGINEERS INC Air and Water Balancing
Consulting Engineers Sound and Vibration Testing
Seattle ♦ Portland ♦ Guam Cleanroom Services
COMPANY HISTORY
R.F Neudorfer and Associates was established in 1970 as a professionally-qualified mechanical
engineering and test and balance organization The firm incorporated in 1980 and the name was
changed to Neudorfer Engineers, Inc.
We strive to provide the best, most professional services of any company in our business and have
forged strong working relationships with both general and mechanical contractors because we make
every effort to complete our work on time and with the least disruption to the client. Our reputation in
the industry is excellent. We would be happy to provide references and a list of recent projects.
Our staff is experienced and skilled at providing air and hydronic systems test and balance services,
building commissioning sound and vibration-level measurement of heating ventilating and air
conditioning equipment; cleanroom testing and certification equipment startup field engineering and
test engineering We provide quality services for every manner of building project, whether new or
tenant improvement, in both the private and public arenas. We have a great deal of expertise
working in a wide variety of facilities such as office buildings hospitals, biotechnology and
pharmaceutical facilities cleanrooms research laboratories, and nuclear facilities.
Although most of our projects are located in the Pacific Northwest, our work has taken us to other
areas of the United States, and to South Africa South America Japan China Guam and elsewhere
Because of this worldwide exposure our staff have gained broadened perspectives and mental
flexibility that make them more effective in their interactions with our clients in the management of
their everyday jobs We have offices in Seattle Portland Olympia, and Guam
Neudorfer Engineers, Inc is certified by the National Environmental Balancing Bureau (NEBB)
Certifications include air and hydronic environmental systems sound and vibration measurement;
building systems commissioning and cleanroom and cleanroom systems. NEBB is a non-profit,
industry-sponsored organization established to upgrade and maintain uniform standards in our
industry Our certifications are the result of having successfully met criteria for length of operation
responsible performance instrumentation ownership calibration and maintenance You can also be
assured that our services are backed by the knowledge required to pass rigorous certification tests
In addition to having achieved numerous NEBB certifications, Bill Neudorfer is Chair of the NEBB
Cleanroom Committee He teaches Test, Adjust and Balance courses at the University of
Washington College of Engineering Continuing Education program Test, Adjust and Balance (TAB)
and Commissioning workshops for the Washington State Energy Office Cleanroom courses for the
NEBB and he has made presentations on TAB Cleanroom Certification and Commissioning for the
American Society of Heating Refrigeration and Air Conditioning Engineers Inc. (ASHRAE)
Professional memberships include the National Environmental Balancing Bureau (NEBB) Sheet
Metal &Air Conditioning Contractors National Association (SMACNA) Construction Specification
Institute (CSI) Vibration Institute (VI) and ASHRAE
5516 15t Avenue South 1500 NE Sandy Blvd Suite#1 614-4 th Avenue East
Seattle Washington 98108 Portland Oregon 97232 Olympia, WA 98501
Phone (206) 621 1810 Phone (503)235-8924 Phone (360) 528-8694
Fax (206) 343-9820 Fax (503) 2358925 z� Fax(360-528-8695
An ff
IV
I11EUDORFER ENGINEERS, INC
Management Staff
Neudorfer William BS/Mechanical Engineering/Washington State University
Seattle Owner
Blascoa, Severino BS/Mechanical Engineering/Manila, Philippines
Seattle - -— — --Project-Manager-/-Field-Su pervisor-/System-Balance-Enineer
Emory Phil BS/Mechanical Engineering/Montana State University
Seattle Senior Project Manager
Vawter Mike BS/Mechanical Engineering/University of Washington
Portland Branch Mgr Portland Office Manager
Rose Maury AA/Mechanical Technology/Puget Sound Community College
Olympia Branch Mgr Project Manager/Field Supervisor/System Balance Engineer
Neudorfer Mike Washington State University
Seattle Field Supervisor/S stem`Balance Engineer/Estimator/Scheduler
Cafky James PhD/Physics/University of Wisconsin
Guam Branch Mgr Guam Office Manager
Technical Staff
Bell Charles BS/ Physics/San Jose State University/ Industrial Physicist
Seattle NEBB Field Supervisor/System Balance Engineer/
TABB Commissioning Supervisor
BenMaor Dave System Balance Engineer
Seattle
Burns Michael System Balance Engineer
Portland
Chan, Cyndy System Balance Engineer
Portland
David Kevin PE BS/Mechanical Engineering/Portland State University
Seattle System Balance Engineer
Davis Anthony System Balance Engineer
Portland
DeTray Robert System Balance Engineer Apprentice
Olympia
Dow Kevin, P E. BS/Mechanical Engineering/Montana State University
Portland Field Supervisor/System Balance Engineer
Eaden, Andrew System Balance Engineer Apprentice
Seattle
Flaatrud Steinar BS/Mechanical Engineering/University of Washington
Olympia System Balance Engineer
Gordon, Miles System Balance Engineer
Seattle
NNEUDORFER ENGINEERS, INC.
Technical Staff
Haugen, Brad System Balance Engineer
Portland
Heuman, Doug System Balance Engineer
Seattle
Hucke, Dennis _System Balance Engineer
Portland
Jonson, Lance System Balance Engineer Apprentice
Olympia
Kim Moon System Balance Engineer Apprentice
Seattle
Llanso Lenny System Balance Engineer
Seattle
Lebedev Alex AA/HVAC/North Seattle Community College
Seattle System Balance Engineer
McCarthy John System Balance Engineer Apprentice
Olympia
McIntyre Brett, PE BS / Mechanical Engineering Technology / Oregon Institute of
Portland Technology/System Balance Engineer
McLean Doug System Balance Engineer
Seattle
McLean Bryan System Balance Engineer Apprentice
Seattle
Morey Mark System Balance Engineer/Journeyman Carpenter
Olympia
Nguyen Duc AA/HVAC/North Seattle Community College
Seattle System Balance Engineer
Nguyen, Vihn System Balance Engineer Apprentice
Seattle
Nguyen Vu System Balance Engineer Apprentice
Seattle
Niemi Ryan System Balance Engineer Apprentice
Olympia
Pestana, Patrick System Balance Engineer
Olympia
Petrie, Bill System Balance Engineer
Seattle
Prepotente, John AA/HVAC/North Seattle Community College
Seattle Field Supervisor/System Balance Engineer
Riggle, Casey System Balance Engineer Apprentice
Olympia
Rodgers, Rich System Balance Engineer/Refrigeration Technician
Seattle
Russell Kyle System Balance Engineer
Seattle
Stine, Christopher System Balance Engineer
Portland
Stohl Greg System Balance Engineer
-- Portland r F ---
Tholl Joseph AA/HVAC/Jacksonville Community College
Portland System Balance Engineer/Refrigeration Technician
NEUDORFER ENGINEERS INC
GENERAL STATEMENT OF THE FIRM
In 1970 the firm of R F Neudorfer and Associates was established as a professionally qualified Mechanical
Engineering and Test and Balance organization In 1980 the firm incorporated and the name was changed
to Neudorfer Engineers Inc
The test and balance services offered included air and hydronic systems sound and vibration-level
measurement of heating ventilating and air conditioning equipment.
- -SERVICE'S-PROVID-E'D
AIR BALANCING
Balancing of the air distribution system and adjustment of the air moving devices according to Sheet Metal
and Air Conditioning contractors National Association (SMACNA) and the National Environmental Balancing
Bureau (NEBB) standards
HYDRONIC BALANCING
Balancing the water side of the heating and air conditioning systems including pumps coils chillers heat
exchangers cooling towers condensing units and boilers
SOUND-LEVEL READINGS
Sound-level measurement with and without equipment running to determine speech interference hazards to
hearing and machinery troubleshooting
VIBRATION CONTROL
Vibration measurement and dynamic balancing of rotating equipment to reduce noise generation and extend
the life of the equipment.
CERTIFICATION
Neudorfer Engineers Inc is certified by the National Environmental Balancing Bureau (NEBB) The
certification includes air hydronic sound and vibration measurement, building commissioning and
cleanrooms
PLAN REVIEW
Neudorfer Engineers Inc reviews plans during the final design phases for air volume damper and hydronic
metering valve and pump pressure gauge locations
FIELD INSPECTION/COMMISSIONING
ield inspection to insure the air and hydronic systems are installed correctly per the design documents
during the construction phase
CLASSIFIED MAIL
Mail any classified information attention Phil Emory or Bill Neudorfer at PO Box 80787 Seattle WA 98108-
0878
NNEUDORFER ENGINEERS, INC
PARTIAL LIST OF MAJOR PROJECTS
YEAR JOB NAME LOCATION
2006 Washoe Medical Center Reno NV
2006. Washington-Mutual Seattle WA
2006 University of Washington Genome Science Building Seattle WA
2006 T-Mobile Snoqualmie WA
2006 The Columbian Portland OR
2006 Stadium High School Tacoma WA
2006 Southwest Medical Center Vancouver WA
2006 Silver Reef Casino Ph 3 Bellingham WA
2006 SEH America (Numerous Cleanroom Projects 2004 - 2006) Vancouver WA
2006 Rocky Mountain Lab Cleanroom Hamilton MT
2006 Overlake Hospital South Campus Bellevue WA
2006 Oregon Men s Prison Madras OR
2006 Good Samaritan Hospital 3rd Floor South Wing Tacoma WA
2006 Cosmopolitan Tower Seattle WA
2006 Berlex Cleanroom Lynnwood WA
2005 WWU Undergrad Marine Education Shannon Point Bellingham WA
2005 Washington Mutual Bank Shell & Core and Tenant Improvement Seattle WA
2005 Warner Creek Correctional Facility Lakeview OR
2005 US Consulate Vancouver B C
2005 Tokoyo Electric Cleanroom Hillsboro OR
2005 Tokai Carbon Cleanroom Hillsboro OR
2005 Symantec Springfield OR
2005 Sound Transit Light Rail Project C-710 Seattle WA
2005 Seattle Premium Outlet Mall (Eleven shops) Marysville WA
2005 Seattle Art Museum Seattle WA
2005 Sabey Data Center Black Diamond Mechanical Seattle WA
2005 Providence Portland CUP Expansion Portland OR
2005 LOTT Wastewater Treatment Plant Olympia WA
2005 Hazen High School Ph 3A & 3B and many other schools Renton WA
2004 WWU Communications Building Bellingham WA
2004 Washington Mutual Tower Commissioning Seattle WA
2004 WA State Public Health Lab E and C Wings Shoreline WA
2004 UW Primate Center Seattle WA
2004 US Federal Courthouse Eugene OR
2004 SW Washington Medical Center(numerous projects) Vancouver WA
2004 Spiration Cleanroom Certification Redmond WA
2004 Salem Hotel & Conference Center Salem OR
2004 PSNS Waterfront Revitalization Bremerton WA
2004 Novellus Building F Tualatin OR
2004 Newberg School Dist. (5 schools) (and innumerable other schools) Newberg OR
2004 King County Courthouse (several) Seattle WA
2004 Corixa—9th & Stewart Seattle WA
2004 Bremerton Naval Hospital Bremerton WA
Partial List of Major Projects
Neudorfer Engineers
Page 2
2004 Bangor Encumbered Waterfront Shops Bangor WA
2004 Amgen/Immunex Helix, Buildings A, B C D E & J Seattle WA
2003 WWU Old Main Remodel Bellingham WA
2003 WA State Public Health Lab Shoreline WA
2003 University of WA Medical Center Surgery Pavilion Seattle WA
2003 Tacoma General L Wing Expansion Tacoma WA
2003 Swedish Hospital SW Tower Seattle WA
2003 Seattle Central Library Seattle WA
2003 Sea-Tac Central Terminal Expansion SeaTac WA
2003 Merck—Rosetta Facility Seattle WA
2003 Legacy Salmon Creek Hospital Vancouver WA
2003 CTI Building 3 3`d & 4th Floor Rebalance Seattle WA
2003 Coffee Creek Correctional Facility Wilsonville OR
2003 Children s Hospital Medical Center Annual Check Seattle WA
2003 Children s Hospital In-Patient Bed Building Seattle WA
2003 Cell Therapeutics Inc. 501 Elliott Seattle WA
2003 Boeing Move to the Lake North South East &West Towers Renton WA
2003 ASIMI Cleanroom Moses Lake WA
2002 Portland Art Museum Portland OR
2002 Park Place Condominiums Portland OR
2002 Novellus Cleanroom Tualatin OR
2002 IDX Madison Financial Tower Seattle WA
2002 Experience Music Project Seattle WA
2002 Evergreen Surgery & Physician's Center Bellevue WA
2002 Providence Hospital Birthing Center Everett, WA
2002 Providence Medical Center Remodel Portland OR
2002 Sea-Tac Airport B C D Concourses HVAC Upgrade SeaTac WA
2002 Sea-Tac Airport Central Mechanical Plant SeaTac WA
2002 Sea-Tac Airport Communications Infrastructure SeaTac WA
2002 Sea-Tac Airport Cooling Tower Commissioning SeaTac WA
2002 Seattle Justice Center Seattle WA
2002 Seattle School District Support Center Seattle WA
2002 Seattle Waterfront Marriott Seattle WA
2002 Stevens Hospital Edmonds WA
2002 Swedish Medical Center Seattle WA
2001 Bangor Naval Facility Disease Vector Ecology Bangor WA
2001 Boeing 9-101 MDL Lab Seattle WA
2001 Boeing Buildings 7-21 7 22 9-96 Renton WA
2001 Capitol One Federal Way WA
2001 Everett Naval Station Medical/Dental Building Everett, WA
2001 Fred Hutchison Cancer Research Center Seattle WA
2001 Honeywell Building 3 and Airflow Cleanroom Study Bellevue WA
2001 Motorola MOS-17 Air Balance Cleanroom Tooling Tianjin China
2001 nLight Manufacturing Facility Vancouver WA
2001 Novellus Cleanroom Portland, OR
2001 Puget Sound Naval Shipyard Bldg 467 457 844 368 Bremerton WA
2001 Sea-Tac Int'I Airport South Terminal Expansion SeaTac, WA
2001 Sea-Tac Int'l Airport Concourse A Expansion SeaTac, WA
2001 Stafford Creek Corrections Center Aberdeen WA
2001 Swedish Medical Center Cancer Institute Seattle WA
2001 Tesoro Refinery Anacortes WA
NNEUDORFER ENGINEERS, INC
INSTRUMENTS
Velometer Alnor Series 6000
Anemometers Bachrach Flowrite
Hot Wire Anemometer Hastings
Pitot Tubes Dwyer
Static Pressure Probes Dwyer
Magnehelic Gauges Dwyer
Manometers Dwyer
Tachometers Mechanical Riddle
Borg Wagner
Phototachometer Pioneer-Electric&
Research
Psychrometer Taylor
Ammeter-Voltmeters Amprobe
Fluke
Electric Thermometer Simpson
Pyrometers Alnor
Assorted Thermometers
Sound Level Meter Model 1933 General Radio
Sound Level Meter Model 1565 General Radio
Assorted Pressure Gauges
Balancing Hoods Shortridge
Vibration Meter Model 207/207LF Production Measurement
Hydronic Pressure Differential Meter Bell & Gossett
Barco/Almco
Ultrasonic Flow Meters Controlotron
Dynasonics
ALL INSTRUMENTS ARE NEW OR HAVE BEEN CALIBRATED WITHIN SIX MONTHS
NNEUDORFER ENGINEERS, INC
1Nilliam C. Neudorfer
Title Owner, President
Job Description/ 1975-Present Neudorfer Engineers, Inc.
Experience Mechanical Engineer
System Balance Engineer
Estimator and Planner
Bill has been President and owner of Neudorfer Engineers Inc. since 1986 In that
time his company has grown from four staff to its present forty He has developed a
ratio of technical and support staff that allows him to continue to provide technical
assistance in the field, and to personally supervise special projects. He has earned all
of the professional certifications offered by the National Environmental Balancing
Bureau(NEBB)and actively participates in NEBB at both the local and national
levels. His skills and experience include.
• Testing and balancing of building systems, including test and balance of
hospitals bio-medical laboratories, and pharmaceutical facilities; packaged
and central air conditioning systems, electric, hot water and steam heating
systems, chilled and condenser water systems; pure water and process
water systems and nuclear facilities (including ANSI and ERDA testing)
■ Building systems commissioning including laboratory and pharmaceutical
facilities, higher education facilities healthcare facilities, industrial systems
petroleum facilities, commercial office buildings, telephone/communication
buildings semiconductor and cleanroom facilities
■ Cleanroom testing and certification Facilities include Biomedical
laboratories, pharmaceutical electronic and semiconductor cleanrooms
• Sound and vibration testing including troubleshooting recommendations,
and remediation for sound and vibration of HVAC source problems
• Project management, estimating and scheduling.
ProjectlClient M University Mechanical
References Skanska
■ Fresenius
■ Multicare `L Wing-Tacoma,WA
■ UW Cancer Care Alliance-Seattle,WA
■ Amgen/Immunex Helix Project-Seattle,WA
Education Washington State University Pullman WA
Bachelor of Science in Mechanical Engineering
Certifications National Environmental Balancing Bureau (NEBB) Certifications:
■ Building Systems Commissioning
■ Air and Hydronic Environmental Systems
■ Sound and Vibration Measurement
■ Cleanrooms and Cleanroom Systems
Affiliations a National Environmental Balancing Bureau(NEBB)
■ Sheet Metal&Air Conditioning Contractors National Association(SMACNA)
■ American Society of Heating Refrigeration&Air Cond Engrs, Inc (ASHRAE)
• Washington State Society for Healthcare Engineering (WSSHE)
NNEUDORFER ENGINEERS, INC
Severino Ching BlaScoa
Title Senior Project Manager
Job Description/ 1990-Present Neudorfer Engineers, Inc:
Experience Mechanical Engineer
System Balance Engineer
Field Supervisor
Estimator and Planner
Mr Blascoa has thirty-five years'experience managing_both large and small-scale
projects. He has extensive experience in bio-medical, pharmaceutical, laboratory
and cleanroom facilities. He works with engineers, architects, owners and
contractors, and field personnel before and during occupancy on both large and
small-scale projects. His experience includes:
• Testing and balancing of building systems, including biomedical laboratories and
cleanrooms, high and low velocity constant and variable volume, packaged and
central air conditioning systems, hot water heating systems, chilled and
condenser water systems, steam systems, electronic/semiconductor
cleanrooms, pure water and process water systems.
■ Performing sound and vibration measurement testing.
■ Building Systems commissioning including; DDC control systems, pneumatic
control systems, electric control systems, HVAC systems, Industrial Air facilities,
process water and process air systems, TAB, plumbing systems, emergency
power systems and electrical systems.
■ Surveying existing mechanical equipment and their related HVAC systems.
■ Project scheduling and coordination.
■ Project estimating.
■ Supervising the work of project balancing technicians.
Direct Supervisor is Bill Neudorfer President
Project/Client ■ Amgen/Immunex Helix Buildings A, B C D
References Sea-Tac Cooling Tower Commissioning
■ Sea-Tac Emergency Generator
■ Fred Hutch SCCA&Administration Building
■ Experience Music Project
• Microsoft Redmond West Complex
Education Mapua Institute of Technology Mapua, Philippines
Bachelor of Science in Mechanical Engineering
Affiliations Member Building Commissioning Association
NNEUDORFER ENGINEERS, INC
Phil Emory
Title Senior Project Manager
Job Description/ 2003 Neudorfer Engineers, Inc.
Experience Mechanical Engineer
Estimator.and Planner
Cost Control Analyst
Mr Emory is a graduate of Montana State University(1985). He holds a Bachelor of
Science degree in Mechanical Engineering. He joined the firm in 2003
Mr Emory has over 17 years of Project Manager experience within the
mechanical contracting industry Asa Senior Project Manager for mechanical
contractors he has managed a wide variety of projects in the areas of
commercial, industrial, medical and cleanroom technologies. He has managed
several design-build and design-assist projects throughout his career
Project / Client Amgen/Helix, Seattle Washington
Pharmaceutical TAB
References ,vi Million — 1-year contract
Swedish Medical Center—Cancer Institute, Seattle Washington
Medical Office Building Mechanical Systems
$4 Million — 1-year contract
Overlake Hospital Medical Center, Bellevue Washington
Medical Office Building Surgery Area Remodel, Parking Garage, Mechanical
Systems
$6 Million —2-year contract
Matsushita Semiconductor Corporation of America FAB D, Puyallup WA
Class 1 FAB CMP and Ion Implant, Cleanroom Architectural Systems
$20 Million— 1-year contract
IBM Building 6 FAB San Jose California
Class 10 FAB Complete HVAC and Cleanroom Architectural Systems
$1 Million —6-month contract
Integrated Device Technology FAB IV Hillsboro Oregon
Class 1 FAB CMP Ion Implant and Support Areas HVAC Systems
$3 Million — 1-year contract
Hewlett Packard Fast FAB, Corvallis Oregon
Class 1 FAB and Support Areas, HVAC Systems
$3 Million— 1-year contract
Boeing 40-56 Expansion 140-37 Clean, Seal & Paint Building, Everett, WA
Industrial HVAC
$18 Million—3-year contract
NNEUDORFER ENGINEERS, INC
Mike Vawter, P.E.
Title Senior Project Manager/ Portland Branch Manager
Job Description/ 1993—Present Neudorfer Engineers, Inc.
Experience Mechanical Engineer
Field Supervisor
Estimator and Planner
System Balance Engineer
Mike has managed our Portland Branch Office since it was opened in 1996. He is
a licensed P.E. in Washington, Oregon and Guam. While he and his staff provide
services mostly in Oregon and southern Washington, they also work throughout
the Northwest and overseas. Managing both large and small-scale projects, his
skills and experience include.
■ Testing and balancing of building systems, including high and low velocity
constant and variable volume, packaged and central air conditioning systems,
hot water heating systems, chilled and condenser water systems, steam
systems, biomedical laboratories and cleanrooms, electronic/ semiconductor
cleanrooms, pure water and process water systems.
■ Performing sound and vibration measurement testing.
■ Building Systems commissioning including; DDC control systems, pneumatic
control systems, electric control systems, HVAC systems, Industrial Air
facilities, process water and process air systems, TAB, plumbing systems,
emergency power systems and electrical systems.
■ Surveying existing mechanical equipment and its related HVAC systems.
■ Project scheduling and coordination.
■ Project estimating.
■ Supervising the work of balancing staff.
Direct Supervisor is Bill Neudorfer President.
Project/Client 0Doernbecher Hospital—TAB Supervisor
References Intel JF-4—Balancing Supervisor
■ Estacada High School—TAB and Commissioning Supervisor
■ Mary's Woods at Marylhurst—TAB Supervisor
■ Tuality Hospital
• Multnomah County Justice Center—Balancing Supervisor
Education University of Washington Seattle WA
■ Bachelor of Science in Mechanical Engineering
Affiliations/ National Environmental Balancing Bureau (NEBB)
Certifications • Air and Hydronic Environmental Systems Certificate
Professional Engineer in Oregon,Washington and Guam
NNEUDORFER ENGINEERS, INC
Maury Rose
Title Senior Project Manager
Job Description/ 1985 - Present Neudorfer Engineers, Inc.
Experience _ System_.Balance.Engineer_
Field Supervisor
Estimator and Planner
Maury is the manager of Neudorfer Engineers'branch office in Olympia,WA,
covering Southwest Washington and the Olympic Peninsula. He supervises a staff
of four engineers and balancing technicians. He has managed projects for
Neudorfer Engineers in Washington and Alaska. His skills and experience include.
■ Testing and balancing of building systems, including high and low velocity
constant and variable volume, packaged and central air conditioning systems,
hot water heating systems, chilled and condenser water systems, steam
systems, biomedical laboratories and cleanrooms, electronic / semiconductor
cleanrooms, pure water and process water systems.
■ Performing sound and vibration measurement testing.
■ Building Systems commissioning including; DDC control systems, pneumatic
control systems, electric control systems, HVAC systems, Industrial Air facilities,
process water and process air systems, TAB, plumbing systems, emergency
power systems and electrical systems.
■ Surveying existing mechanical equipment and their related HVAC systems.
■ Project scheduling and coordination.
■ Project estimating.
■ Supervising the work of project balancing technicians
Direct Supervisor is Bill Neudorfer President
Project/Client Matsushita Semi-Conductor of America, Fab 'D' -Puyallup,WA Project Manager
References Multicare 'L Wing Tacoma, WA Project Manager
Providence St. Peter Hospital(Numerous Projects)-Olympia,WA Project Manager
Linear Tech-Camas,WA Project Manager
Technical Arms Training Facility-Fort Lewis Project Manager
The Evergreen State College-Olympia,WA Project Manager
Education i South Puget Sound Community College Olympia, WA
Affiliations/ s RTA in MechanicaVArchitectural Technology
Certifications North Seattle Community College
HVAC courses
NEBB Cleanroom Training, Palm Springs
Member Building Commissioning Association
i
THIS IS TO CERTIFY THAT
Neudorfer Engineers, Inc
in Seattle, WA
HAS MET ALL REQUIREMENTS FOR RENEWAL OF NEBB
CERTIFICATION IN THE FOLLOWING DISCIPLINE
Act and MyAontcs � sterns 11ny
FOR THE BOARD OF DIRECTORS
2006 - 2008
Neudorfer Engineers, Inc /WA President
No 2465
President-Elect
IqP
NE , BB
Tatifiraft of �Arrrrtifirativift
THIS IS TO CERTIFY THAT
Neudorfer Engineers, Inc
in Seattle, WA
HAS MET ALL REQUIREMENTS FOR RENEWAL OF NEBB
CERTIFICATION IN THE FOLLOWING DISCIPLINE
}
SouO Vi6ration
FOR THE BOARD OF DIRECTORS
2006 - 2008 !�'
Neudorfer Engineers, Inc /VVA President
No.2465
NEBB Cert. No President-Elect
Ap jlMtntt"
M ,
n)==--1
JA
-_-__= E .1- BIB
Tatifiraft of iqrartifiratilaft,
THIS IS TO CERTIFY THAT
Neudorfer Engineers , Inc
in WA, USA
HAS MET ALL REQUIREMENTS FOR RENEWAL OF NEBB
CERTIFICATION IN THE FOLLOWING DISCIPLINE
(2leanroom Pe4ormance Jestin,
9
FOR THE BOARD OF DIRECTORS
2006 - 2008 - .g
Neudorfer Engineers, Inc /USA President
No CR140
Ti ).--
NEBB Cert. No. President-Elect
Egg _ MAMM---m,
i%
���Y,3 �� t E\ �,�. �1, f� !�\'�J• ��l �/ \� "� I!` � ��1.,r4�s'Frs>V7r�t7Q�..c, L I'1!'�,��.�` x�t_ILI' l� �l� r r
BUILDING COMMISSIONING
/
' / / .
ASSOCIATION
certificate confersFULL A/11EA A/113E P, -
1. ,
-SEH
t
To
-Veudorfer Engineers
�( Association, ssential
Attributes of Comn-ussioning and the P6er Re-vie�v- , }
process
Ez
tHiVTII'rYs C+IF
126 01,11 t: 1 /
Memberstup Number Date of Electton' to Membership
Signarme Presi ieat:�Q- Signature Executive Director
This certificate attests Membership for the cali2nclar year of election only Renewal Membership cards attest Membership
i
-1��i r. Y.nRN'f{9YMV.wIKS f � Nvi /Ni ,rR�XYrIR+hW4YN,PSSfS?f9 status subsequent years
-Y
.(i• � ,NNWRTrm mn.lWMMn+n'.Y r.LSSR/i rnYnMM -n'hliYn rrt5?4 '(R I,5'NW,:'i MNM1•l/%(!Ih'/r(N!(/W?(R'%R- .t Rhf Y -
,, F` .err'"� � C'✓ k_ gg
F�ss�rN:w vrwvrn./ mswwr ��, .. ,�u:rNrm � `ti
fflf
`��.\�4>ri• F/
/r/ ;r
'�+ 4�- JyJ '�II�1•'`'��J' o-c:,� , =y;,'''6/i:\�1✓`'r�" I 1 A/.\�.���rN.�a { '_'`�-YLL/ \9 r"
ll
�•i �1'AI:}' �{•� �� l�L .b�++ j�{IIYL14l ,""'+czK .�'� �rlA1t��I,3it V7„ kGes - IR'�/1 � r •. '.^_•.''�I��lj�,�<�'�4} ' = tl,-��_l _i. •x',,..11\ V..
��:�.� ys '��r isc�"'z a ���� ''F,}ctL"�a r �. -� \�. �-�,�L^4oT.� -i�`1�•,rt'S�,{)y:.�'�-� �.:✓•{�� `�"� �W . _ � V.lt� ��d�:'.`�`
OB
4 Lqrquatifirattlall
Tatifiratr of
THIS IS TO CERTIFY THAT
WilliA"i C. 4I ewborfer
vAtJi NeNborfer £"Si"eers, 1"C. iN Suttle, WA
a
HAS QUALIFIED TO SUPERVISE ENVIRONMENTAL
TESTING AND BALANCING FOR
�3ullNnj (2ommissioninj - H, VgC
FOR THE BOARD OF DIRECTORS
2004 - 2006
Nemborfer £"gimers, l"c./WA President
No.246f
NEBB Cert. No. President-Elect
i
OlArdtu ttat
Ot
-7tFBjN BE
Tatifiraft of �Arquatifirativll
THIS IS TO CERTIFY THAT
WilliA"i C. Nevborfer
witli Ncuborfer E"Si»eers, lic. iN Seattle, WA
HAS QUALIFIED TO SUPERVISE ENVIRONMENTAL
TESTING AND BALANCING FOR
:Bu11N"nj -
Plum6inj
FOR THE BOARD OF DIRECTORS
2004 - 2006
Ncubo1 er IE"Si"eers, I"c./WA President
No.24GS
NEBB Cert. No. President-Elect
E
6
O PILA
Oe�
�I-
VF
NOTES OF MEETING WITH ROBERT MAST
GATEWAY FACILITY—JANUARY 2, 2009
Attendants
Jim Malhum Jim Lierly Nathan West, and Glenn Cutler of the City of Port Angeles, Ingo
Goller and Tom Ellis of Exeltech Tracy Gudgel of Zenovic &Associates Inc. and Robert
Mast of Berger/ABAM Engineers
The purpose of the meeting was to hear verbal preliminary status report by Robert Mast
concerning his review and inspection of the Gateway Center to address possible
structural design issues. The following are key points brought up by Robert Mast in the
meeting The statements are paraphrased and may not represent exact wording of his
comments.
- The post tension forces in two of the beams including P133 and 4 are much
higher than the p t. forces in the other beams. He has not completed his review
and thus cannot answer reason for these high forces in the two members.
- There are cracks in the soffit of some of the beams which may be of issue
- It appears that design engineer designed for final loads but didn't appear to have
checked design for load case prior to loaded deck which may be load case
governing the design.
- The cracks in P64 likely caused by termination of strands Although not a code
issue reinforcing is typically added to address the forces at the termination
- Shear friction was an issue and should have been accounted for in the design
He also mentioned that he was one of the forefathers of the concept of shear
friction
- The proposed repair needs to handle the shear friction forces.
- The design changes to add the 45 degree wall and also the wall at the south side
of the structure along Front Street do change the design parameters and have an
effect on the design that may not have been considered These design changes
cause some of the post tension forces to transfer out into these walls and
therefore there is some question whether the beams have the correct post
tension forces to meet design requirements since post tensioning should
minimize and eliminate cracking
- Questions of Building Department were valid and justified
- It was prudent not to load the deck with the topping slab until design issues have
been resolved
- Wall should be properly repaired prior to installing topping slab This repair
needs to have proper anchorage to resist shear friction forces
- Proposed repairs have not yet been provided to him for his review but Exeltech
was going to be getting him copies for his review
Page 1 of 9
Internet Message Novell
Properties
From: 'Bill Alton <balton@xltech.com>
To: 'Stan Cruse 'Susan Smith
Cc: Jim Mahlum, 'Ingo Gotler'
Date- 12/29/2008 11 56.37 AM
Subject: FW Elevator Machine Room Ventilation
e TEXT.htm
Stan,
The state elevator inspector is requesting the formula per code as to how
the CFM for the fan was determined. (See below highlighted red inspectors
comment.) Can you please provide?
Thanks.
Bill Alton
Office Engineer
Exeltech Consulting, Inc.
116 West 8th Street, Suite 120
Port Angeles, WA 98362
balton@xltech com
P (360)417 3803
F (360)417 3097
Sustainable Engineering Solutions for a Changing World People Not
Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are
the property of Exeltech Consulting, Inc. Reuse of the files for any other
purpose without authorization is strictly prohibited. Exeltech Consulting,
Inc. shall not be held responsible for any and all losses, claims or
liabilities associated with the unauthorized use interpretation or
modification of the files or text
file.//C \Documents and Settings\jheathTocal Settings\Temp\messages.xml 4/21/2009
Page 2 of 9
From. Roland Ordona [mailto:roland@primosequim.com]
Sent: Tuesday December 23 2008 10.30 AM
To: Ingo Goller
Cc: Tom Ellis; Bill Alton Jennifer Howell
Subject: FW Elevator Machine Room Ventilation
Ingo here s the last response from the elevator inspector I hope we can
get this done so I can proceed and get this thing signed off
-Original Message-
From. Ernstes, Becky (LNI) [mailto:ERNB235@LNI WA.GOV]
Sent. Tuesday December 23 2008 10:04 AM
To. Roland Ordona
Subject. RE. Elevator Machine Room Ventilation
Please present me with the formula per code as to how you determined the CFM
for the fan
From. Roland Ordona [mailto roland@primosequim.com]
Sent. Monday December 22, 2008 11 50 AM
To- Ernstes, Becky (LNI)
Cc: Jennifer Howell
Subject. FW Elevator Machine Room Ventilation
Becky this is the latest info from the arch. (see attachment also). Should
I proceed with their recomendation or are they still lacking required
information?
-Original Message-
From. Ingo Goller [mailto•igoller@xltech com]
Sent: Friday December 19 2008 4 28 PM
To: Patsy Busby [patsy@primosequim.com] Katie Garcia
[katie@primosequim.com] Roland Ordono [roland@primosequim com] Jennifer
Howell
Cc: Roger Horton, Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us]
Lindsay Murray
Subject. FW- Elevator Machine Room Ventilation
Roland,
The louver in the door shall be a 10X18 sized louver See note from
designer below
Ingo Goller PE
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 3 of 9
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not
Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are
the property of Exeltech Consulting, Inc. Reuse of the files for any other
purpose without authorization is strictly prohibited. Exeltech Consulting,
Inc. shall not be held responsible for any and all losses, claims or
Liabilities associated with the unauthorized use interpretation or
modification of the files or text.
From. Susan Smith
Sent: Fri 12/19/2008 9.50 AM
To Stan Cruse
Cc: Ingo G011er- Robert Kugen, jdugan@parametrix.com
Subject. RE. Elevator Machine Room Ventilation
Stan,
I would like to see the 18/10 louver like the type 5 door
Attached is the spec sheet from Titus, please note that the pressure drops
are the governing factor for this type of grille- I have highlighted them on
the attachment.
Please let me know if there are further questions. I enjoyed my snow day!
But you can always call me on my cell if I am out of the office
Thanks,
Susan C Smith
Tres West Engineers, Inc.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 4 of 9
2702 S 42nd St, #301
Tacoma, WA 98409
253-472 3300 x131
253-472 3463 F
253-312-6054 Cell
From Stan Cruse [mailto SCruse@parametrix.com]
Sent: Thursday December 18, 2008 9.38 AM
To: Susan Smith
Subject: FW Elevator Machine Room Ventilation
Susan can you confirm the size of the louver we need (free air)?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
From. Ingo Goiter [mailto•igoller@xltech.com]
Sent: Thursday December 18, 2008 9.36 AM
To- Stan Cruse- Robert Kugen, James Dugan
Cc: Susan Smith [scs@treswest.com] Roger Horton, Tom Ellis, Bill Alton; Jim
Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: Elevator Machine Room Ventilation
Stan,
Please confirm the size of the ventilation louver to be installed in the
door to the elevator machine / electrical room to allow adequate make up
air Is the 12"X12' size called out on plan sheet A4 01 detail A5 correct?
Ingo Goiter PE
Construction Manager
Exettech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 5 of 9
igoller@xltech com
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not
Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are
the property of Exeltech Consulting, Inc. Reuse of the files for any other
purpose without authorization is strictly prohibited. Exeltech Consulting,
Inc. shall not be held responsible for any and all losses, claims or
liabilities associated with the unauthorized use interpretation or
modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
CIVIL ENGINEERING
N a V _ - _ _ LAND SURVEYING
q 301 East 6th Street,Suite 1
& ASSOCIATES MC 66 Port Angeles,Washmgton 98362
1 N C 0 R P 0 R A T E D
CITY OF PORT ANGELES (360)417-0501
December 26, 2008 Dept.otCommunityl?evelo ment Fax(360)417-0514
Mr Jim Lierly E-mail:zenovic@olympus.net
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
I have reviewed the memo dated December 17 2008 from Ade Bright to Stan Cruse of
Parametrix requesting clarifications from the City of Port Angeles. Following are my clarifications
to Ade s Memo with my item numbers matching his.
1 1 was stating that the double channels appear weak in torsion. Torsion may be
introduced in the channels if there is any eccentric loading to the channels. The
proposed method of using plate shims may induce torsion since it will be hard to
obtain complete bearing contact across the shim between the beam and the top of the
channel and thus induce torsional forces from eccentric loading. Also since the one
channel does not run full length and attach at the ends to the columns it lacks the
same rigidity as the full length channel
2. This office will comment on the angle option. It is not the responsibility of this office or
the City of Port Angeles Building Department to direct the design engineer on what
methods are to be used in the repair or for temporary support. Our responsibility is to
review plans and calculations submitted for conformance with applicable codes
3 The second paragraph of my December 3, 2008 letter does not state that the topping
slab loads were not included in the proposed shoring design. To clarify the
calculations do appear to include all dead loads including the topping slab and also
construction loads. The issue is that the proposed shoring deviates from the
recommendation of the previous letters since the proposed shoring is actually
providing support for placement of the topping slab and is not a fail safe shoring
system to protect against structural failure during loading(placement)of the topping
slab. The proposed purpose of the fail safe shoring system was to catch and hold the
beam if the bearing support of the wall which has significant spalling/delamination,
fails during placement of the topping slab
I hope that my responses provide the clarification needed by Ade and Krei to keep the process
going.
Please call me if you have any questions on this matter
Sincerely
3
Tr y %A�Gudgel, P E.
' 1
Fc: JN 08091
Page 6 of 9
b
Internet Message NovelL
Properties
From: Stan Cruse <SCruse@parametrix.com>
Cc: Jim Mahlum, James Dugan, Susan Smith [scs@treswest.com] Ingo Goiter
Date- 12/23/2008 08.58.30 AM
Subject: RE. Carbon Monoxide Sensor
TEXT.htm
Ingo
Looks like we need a report as required in Section 15950 Tests, Adjusting, it Balancing. Did someone from exettech
witness the testing?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
From. Susan Smith [mailto:scs@treswest.com]
Sent: Tuesday December 23 2008 8.52 AM
To Stan Cruse
Cc: James Dugan, Ingo Goiter- Jmahlum@cityofpa.us
Subject: RE. Carbon Monoxide Sensor
Stan,
The sensor was approved during the submittal process.
I would like a report of how the sensor was tested, this should be tested with the Owners representative witnessing.
Thanks,
Susan C Smith
Tres West Engineers, Inc.
2702 S 42nd St, #301
Tacoma, WA 98409
253-472 3300 x131
253-472 3463 F
253 312-6054 C
From Stan Cruse [maitto SCruse@parametrix.com]
Sent. Tuesday December 23 2008 8.31 AM
To Susan Smith
Cc: James Dugan, Ingo Goiter- Jim Mahlum [Jmahlum@cityofpa.us]
Subject. Carbon Monoxide Sensor
Susan,
Ingo marked the transmittal for approval. Does this meet your requirements for testing report? I know the fan was in
the balancing report, but it did not say how it was tested, unless the report and this report were done on the same
day?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 7 of 9
cell. 360 710 6425
scruse@parametrix.com
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
CIVIL ENGINEERING
LAND SURVEYING
tEE"NNQV!1(C - - - _EV E D301 East 6th Street,Suite 1
SSOCIATES DEC 1 '9 2008 Port Angeles,Washmgton 98362
I N C O R P O R A T E D
_ (360)417-0501
CITY OF FORT ANGELES IA Jr�0�
December 19 2008 BUtLOM oIV00 Fax(360)417-0514
E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway—West Parking Garage
Dear Mr Lierly
This office has reviewed the response letter dated December 4 2008 from Robert
Bourdages of Poggemeyer Design Group concerning my letter dated September 29
2008 In general the responses to the questions are acceptable and appear to
adequately address the issues However in regards to item #2 of my original letter
concerning the cracking in the beam at the ends of the shear walls, we request that the
engineer provide calculations to show that the stirrup spacing and beam reinforcing is
adequate in the beam due to the change in bearing condition due to the shear wall
creating bearing It is noted that the shear load in the beam would be less due to its
shorter span but calculations should be provided to show that the beam is properly
reinforced for this reduced shear load
Please call me if you have ny further questions on this matter
Sincerely
Tracy Gudgel, P E.
Fc: JN 08091
WAS AG,�oZ
N
�DitFsv G
10Ir'A1-
Page 1 of 2
Internet Message Novell.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: James Dugan, Robert Kugen, Ingo Goller
Cc: Jim Mahlum; Susan Smith [scs@treswest.com] Bill Alton Lindsay Murray- Roger Horton, Tom Ellis
Date, 12/18/2008 03 38.10 PM
Subject: RE. Elevator Machine Room Ventilation
TEXT.htm
OF
Ingo
Because of the snow here it looks like Susan did not make it to work today get you an answer as soon as we can.
Parametrix
inspired people inspired solutions making a difference
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
From Ingo Goller [mailto.igolter@xltech.com]
Sent. Thursday December 18, 2008 9.36 AM
To. Stan Cruse- Robert Kugen, James Dugan
Cc: Susan Smith [scs@treswest.com] Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay
Murray
Subject: Elevator Machine Room Ventilation
Stan,
Please confirm the size of the ventilation louver to be installed in the door to the elevator machine / electrical room
to allow adequate make up air Is the 12"X12' size called out on plan sheet A4 01 detail A5 correct?
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xttech.com<mailto.igoller@xltech com>
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheathTocal Settings\Temp\messages.xml 4/21/2009
jECEHE 19 200
0
r;�r,7�, CITY OF PORT ANGELES
W A S H I N G T O N U S A Dept.of Community Development.
PUBLIC, WORKS & UTILITIES DEPARTMENT
v"
0
0
Date December 18, 2008
To Nathan West,Director of Community Development
Jim Leirly, Building Inspector
From Jim Mahlum, Civil Engine
Subject: Gateway Project Delamination Fix
Attached are the following from Krei Architect for your review, comments is�a request for
Clanfication.
9
I have also attached a copy of my letter dated November 18, 2008 that is quoted in their request. The
statement was given as an example and suggestion of something to consider, not as a directive It
was also given in the context of a temporary fix in order to be able to load the deck.
In order to keep the this process going and keep Krei moving on this issue, please provide an answer
by December 23, 2008 to order to get at sent to Krei for their review
0 ..
0
CC iExeltech (email) _ G
Clallam Transit (email)
Glenn Cutler Director of Public Works and Utilities (email)
Steve Sperr, City Engineer(email) G
( l
L
0
N TROJECTSM 20 Gateway\26 Claims&Liens\CED\Krei clarification(12 18-08)transmittal to CED.doc
0
Rright E—ngineering Inc Consulting Structural and Civil Engineering
Memo
Date December 17 2008 PAIG - 116 03R
To Stan Cruse,Parametnx,Inc
2102 N Pearl Street, Suite 301
Tacoma,WA 98406
From Ade J Bright
RE. Port Angeles International Gateway
Request for Clarification on COPA comments
As requested, the following are clarification we request from COPA on the last round of there
comments regarding shoring:
1 Item 2 Help or point us to the mechanism with that introduces torsion to the top
connection. "�jo e
2 In Jim Mahlum s letter to Jim Dugan dated November 18, 2007FA suggested considering
using angle fixed to the wall to support the end of the beam in order to proceed with
loading the deck. Is this the preferred solution we should be working with?
3 The second paragraph of Zenovic s letter stated that the temporary shoring did not account
for the topping slab whereas we have consistently define total dead include all permanent
loads (all loads other than) live load. How can we restate this to make our definition clear?
CC: Signed Ade J Bright,PE, SE
80q 7'�' A j, 00 S, �EEle VA 98101.1381 2o6.625.37-7 '06 5. 1 � (oma 6 ighteng
0- R_<T
Nu`3 I
E S
f
W A S H I N G T O N U S A
Public Works & Utilities Department
'.; November 18 2008
Rt; James Dugan, Owners Representative Services Division Manager
11 `` Parametnx, Inc
2102 N Pearl Street, Suite 301
:r Tacoma, WA 98406
(s
Re International Gateway Delamination Summary Letter
.r
Dear Jim,
c. The Principal s meeting was very good last Thursday November 13 with a number of action items It
seemed all parties were focused on resolving the one mayor outstanding item,completion of the Plaza
Deck. On behalf of Krei Architects,you committed to memorializing direction, decisions and completing
�. research by the end of last week to ensure that when the Building Official s consultant returned from
vacation on Monday he would have all information available to complete his review This has not
happened.
Based on your 8.23pm November 17 email to me, I am extremely disappointed that I will not have Krei s
clarification letter until sometime on Wednesday November 19 after being promised more than once I
would receive it on Monday In anticipation of receiving the Krei s letter on Monday I scheduled a
meeting for 9 AM Tuesday morning(today)with the Building Official, Building Inspector and Tracy
Gudgel to address the last two packages of information provided by Krei. Tracy was reviewing them all
Monday into the night, in preparation for today's discussions.
Time is of the essence Please expedite the necessary reviews I also request you seek consideration from
Bright Engineering concerning providing a method for construction completion that might permit
f construction to be completed in a shorter timeframe than outlined in the last direction given. For
example,Bright Engineering may want to give consideration to placement of an angle iron support fixed
to the wall as a method of support under the beam, development of a plan for placement of the Plaza Deck
concrete in non-critical area, etc
The financial impacts are not known nor have they been presented by the contractor Primo Construction.
A prudent person would anticipate that added costs are being accrued, including costs associated with
additional construction management effort by Exeltech, and building permit inspection by the Building
Official and his consultant. It is imperative that resolution to this ongoing issue be resolved soonest.
I look forward to your timely response to these issues
Sincerely
G^-�4
mes M. Mahlum, Project Manager
Nathan West, City Building Official
Clallam Transit
Exeltech
Phone 360-417-4805 /Fax 360-417-4542
Website wwwcityofpa.us/Email publicworks@cityofpa.us
321 East Fifth Street P 0 Box 1150 / Port Angeles WA 98362-0217
Primo Construction,Inc. Letter Of
970 Carlsborg Road
Sequim, WA 98382-8391 Transmittal
Phone:(360)683-5447
Fax:(360)683-6475
Date: 12/17/2008
TO- City of Port Angeles Project# 702203
321 East Fifth Street ATTN Jim Lierly
Port Angeles,WA 98362 RE. Gateway
We are sending you the following: Attached ❑ Under Separate Cover
The following items: ❑ Shop drawings ❑Prints ❑Plans
❑Requisitions ❑Change Orders ❑Samples
1 12/17/2008 1 Response letter
These are transmitted as indicated below•
For your use ❑Approval as noted ❑ For Approval ❑As requested
❑Approved for Construction ❑ For review and comment ❑ Returned for corrections
❑ For payment ❑ Return ❑ Corrected Prints D'For bids due:
Remarks.
Received By- D
e :
Title-
Copy to
❑Recipient's Copy
❑ Sign&Return
❑File Copy
v}: y�
r
e POGGEMEYER p
DESIGN GROUP
DEC 1 1 2008
December 4, 2008 PRIMO CONSTRUCTION INC
Mr James Bartee
Owner
Primo Construction, Inc.
970 Carlsborg Road
Sequim, WA 98382
Dear Mr Bartee
RE Port Angeles International Gateway
West Parking Garage
Port Angeles, WA
This letter is a follow up to an inspection letter prepared by Zenovic&Associates Inc., dated September
29, 2008.
1. The engineer shall address the migration of the cracks in the deck slab from the time of the July
30, 2008 inspection(report#4)to present. Based on Exhibit A,provided by Primo Construction, a
number of the cracks have increased in length and additional cracks have occurred. Please
address the recommendation in site visit report#4 that no physical crack control measures be
implemented for at least two years. Also provide proposed recommendations for repair of the
cracks in the upper deck slab.
Cracks in the structure result primarily from shrinkage of the concrete during the curing
process.The walls and deck are cast integrally but will exhibit different crack patterns due to
having different design mixes, different pouring sequences,and different stress conditions.
The east-west orientation of the deck cracking relates to classic shrinkage patterns in
rectangular slabs.The cracks generally originate from the west side because the slab is
restrained from volume change by virtue of integral construction with the west wall.Along
the east side,the columns allow some movement with the shrinking slab and therefore do
not exhibit nearly the degree of cracking compared to the west side.
Shrinkage will continue for some time, but at least 2/3 to 3/4 of the total volume change has
already occurred.As shrinkage continues,the crack lengths may extend eastward.
Eventually the entire structure will stabilize (with respect to shrinkage)and the cracks
should close (if not repaired)f•om the eventual creep of the concrete deck from post
tensioning compressive forces.
Cracking may also be influenced by volume changes from thermal loading.
�= "j
51/b ti eet South,Suite 2021 Kirk and Wast-ngten 980331 P 425 827,59951 v.aw,porL. r e con,
POGGEMEYER
DESIGN GROUP
Port Angeles International Gateway
West Parking Garage
December 4, 2008
Page 2
Deck and crack repair and maintenance measures have been identified in our letter of
September 22, 2008.
The timing of the crack repair work was noted to be at least 90 day from last pour as noted
in the 9/22 letter
2. The engineer shall provide an analysis of the cracks occurring in the post-tensioned(PT)beams at
the inside face of the concrete shear walls in the east/west direction. There are three semi-
vertical cracks which have developed at each end of each PT beam near the inside edge of the
concrete shear walls. These can be seen on pictures#1, #2, #3, and#4 Please address the fact
that the stirrup spacing shown on detail 8/58 changes at this same location and the fact that the
shear walls appear to be providing vertical support of the PT beams.
Cracks in the vicinity of the transverse (short)shear walls are likely caused by-
a) Shrinkage in the east-west direction with restraint provided by the shear wall
b) Flexural stresses at bottom fibers of beam induced by post-tensioning
c) Shear stresses
d) Abrupt change in geometry at beam to wall interface
The cracks widths are approximately hairline in width.The structure is not impeded by these cracks
because aggregate interlock exists,shear reinforcing is adequate by design,and flexural reinforcing is in
place to keep the crack width small.
The shear reinforcement spacing reduces at the same location as the end of the shear wall.This is
coincidental only—the beams were all detailed the same even though the beams with the shear walls
have a reduced span.The shear wall does support the ends of the beams.
3. Please address the cracking in the west wall of the structure along Grid Line 0.1. Provide an
explanation as to cause of cracks and proposed repair methods if any These cracks occur at a
number of locations and can be seen in pictures#8, 9, 10, 11, 12, 13, 14, 15, 16, and 17
Cracks along the west wall relate to volume changes,as noted in item#1.The most significant vertical
cracking is located on either side of the deck closure pour These cracks have been repaired by the epoxy
injection method.
4 The engineer shall address the cracking issues noted in items 1 through 3 above with any required
fixes and shall provide a statement that the cracking noted above with any proposed fixes, does
not compromise the structural integrity of the structure.
POGGEMEYER
'DESIGN GROUP
Port Angeles International Gateway
West Parking Garage
December 4, 2008
Page 3
Most of the deck cracks were noted to be hairline in width (<0.5mm) Cracks of this type(up
to approximately 1.5 mm)will not affect the structural integrity of the deck slab because-
aggregate interlock exists(adequate shear transfer across the cracked section), mild
reinforcing is in place and cannot yield across small width cracking; and the post-tensioning
remains fully functional.Also, repair procedures that have been implemented are expected
to restore the tensile capacity of the concrete section,according to the manufacturer
(Sikadur 55 SLV)
The wall cracking has been repaired according to recommendations in our letter of
September 22,2008. Epoxy injection was applied and will completely restore the structural
integrity of the wall in the vicinity of the crack.
5 Conclusion. The noted cracking has been evaluated The major wall cracks have been
repaired.The deck cracks have been repaired/improved with the application of a watertight
treatment. The structure will perform as designed.The noted cracking and subsequent
repairs will not adversely affect the performance of the structure.
Should you have any additional questions or comments, please feel free to contact us.
Regards,
Robert Bourdages,S.E.
Principal
Poggemeyer Design Group, Inc.
B
2t0 $
�"csj0�\rU-�G
Craig L Miller, P S
ATTORNEY AT LAW
Craig L Miller Vickie L Brewer
December 12, 2008 E C E �n E
D v
Nathan West 0
CITY OF PORT ANGELES DEC 15 20
Director of Community Development
P O Box 1150 CITY OF PORT ANGELES
Oept.of Community Development
Port Angeles, WA 98362
RE PORT ANGELES INTERNATIONAI.GATEWAY PROJECT
Dear i1:i r \A a -,
Clallam 'Transit System ("CTS") is the owner of the above rt:ferenced project. .F mvner
CTS has been aware for some time of the current issue between CTS s architects and
engineers and the Port Angeles Building Official concerning concrete delamination in the
east garage It appears to CTS as owner, that there is either a disagreement or
miscommunication between the project's engineers of record and the Port Angeles
Building Department over this Issue, and that it is not being resolved in a timely manner
In order to assist in resolving this- dilemma, CTS; has recently retained a structural
eagmee, "I'"his.engineer. will report directly to (: TS in regard to the situation C 1� has
retained 'theservices of Mr Robert Mast of ARAM Engineers for this review CTS
anticipates .that Mr Mast's report will be made availably: to the City In the hope at
resol ng the current issues. Mr Mast has Indicated that his report should be avaii,ible
before Christmas.
CTS has been made aware that vou, as the City s Building Official, are also Lonslilering
the retention of a structural engineer tor a review of the prolect. You have also put CTS
on notice that further review costs by your department will be charged to the project. It is
hoped that you will wait to retain voui cwn engineer until S ACh time as the CTS engineer
issues his report. fhe Gatewav is a publics\ funded protect and. were two structural
engineers retained. b-Atli would t;e aid *of at.. nubl.c expense It is hoped that this
duplication of effort can be avoided.
Very truly vours.
CRAIG i MILL[tR P 5
Craig,L flex ;
i•i.hvlil
l c I errs Weed,
._,leen Cutler
,xel -ch 711 EAST FRONT STREET,SUITE A
PORT ANGELES,WA 98362
(360)457-3349 (360)45''-3379 FAX
e-mail emillergeraiglmiller.com
e-mail vbrewergcraiglmiller,com
ORT NGELES
I►,_-
WASHINGTON, U S A.
Community & Economic Development Department
December 11, 2008
Tracey Gudgel
Zenovic and Associates
310 East Sixth Street
Port Angeles, WA 98362
�g
} Dear Tracey-
Through this letter, I wish to reiterate in writing our conversation in expression of my
appreciation for the manner in which you responded to the City's request for an evaluation
of engineering issues concenung the City's Gateway development. I am confident with your
research, assessment, and evaluation of the matter put to you to determine if issues of
r z concern exist in the current development. However, by this letter I want to reiterate some of
xy,. .. our previous conversations in that.I need to ask that if, at any time, you feel uncomfortable.
of your ability to evaluate the matter based on professional capabilities, qualifications, or
resources available to you, that you let me know immediately
µ Thank you again. Your professionalism in this matter is greatly appreciated.
:N4 Sincerely,
`M k ;`, Nathan A. West, Director
>�
Ml Department of Community&Economic Development
tt r
ar �.
"t� its
. Phone 360-417-4750/Fax- 360-417-4711
H Website wwwc;1,yofpa.us/ Email smartgrowth@cityofpa.us
321 East Fifth Street P 0 Box 1150/ Port Angeles WA 98362-0217
'p' • P. ORT, NGELES
►.,_�
WASHINGTON, U S A.
Community & Economic Development Department
December 8, 2008
a
Jim Malilum
Project Manager
Public Works and Utilities Department
City of Port Angeles
321 E. Fifth St.
Port Angeles, WA 98362
q�
Subject: Response to November 26,2008 Gateway Project Delamination Fix
Dear Mr Malhum.
Further .to our December 27 2008 discussion, please find attached letter from
Zenovic and Associates regarding your November 26, 2008 Gateway Project
Delamination Fix proposal Based on the information.provided I can not support
�'� `°�•� '`' e
the proposal at this time. Details of those concerns are outlined m the attachment.
.
��p F
r Sincerely,
i 7
?;
Nathan A. West, AICP
{� Director of Community and Economic Development
CC Glenn Cutler, Director of Public Works and Utilities, City of Port Angeles
k"
Mel
A
Phone 360-417-4750/Fax 360-41-7-4711
4*
: X Website wwwcityofpa.us/ Email smaitg owth1cityofpa.us
:;, 321 East Fifth Streer PO Box 1150/Port Angeles WA 98362-0217
Iff )O Pr' �� ��
I�� /� � � + ' � f
�-'-''- �~28�~-`°-
DD
301 East 6th Street,Suite I
& ASSOCIATES Port Angeles,WashingtOD 98362
/ xcoxpoxxT Eo 1 (360)417-0501
LD11 0 3' 2010 8] Fax(360)417-0514
E-mail:zenovic@olympus.net
December 3. 2OOB '- -
ELES
Mr Jim Liedy
Building Inspector
City ofPort Angeles Department mfCommunity Development
321 East Fifth Street
�� O �]�
Po�Angeles, VVAS83G2 � �/ uuu
-_--' '
SUBJECT Port Angeles International Gateway /
$
�-_-_
Dear Mr Liery
| have reviewed the package from Jim KAmh|um of the Pod Angeles Public Works and Utilities
Department dated November 20. 2O0G This package contains details and calculations from
Bright Engineering dated November 2S 2OO8. EmaUufrom James Dugan dated November 20
2OO8regarding permanent shoring design solution and surface crack physical nnon�oringplan
outline, and afoUow up email on the P133 and physical monitoring plan outline, a proposal from
CTL Group for post tensioned beam crack monitoring and letter from Krei Architecture to Terry
Weed ofC|o||mm Transit.
The proposed shoring and monitoring program deviates from the recommendations noted in my
letter dated November 10 2UDBand brings upanumber ofnew issues that must baaddressed to
proceed with the shoring First and foramoot, it is the opinion of this office that at this time the
proposed shoring should only be considered temporary in nature, as is stated on the cover of the
structural calculations of the shoring by Ade Bright, since the design engineer still needs to
address all the issues previously documented and again mentioned in my letter dated November
18 2OO8prior boany approval ofofinal repair plan The proposed shoring concept deviates
from the recommendation since it is being designed to actually support the dead load at PB3 and
is not just a fail safe shoring in case of structural failure during loading of the topping slab The
proposed type of monitoring and the duration of the monitoring have also changed and must be
addressed and approved prior toany work being performed |tiorecommended that the design
engineer and architect review the previous letters for the requirements of loading the deck and for
requirements for final approval of a fix for the spalling/delamination and addressing the cracks in
PB4
That said in reviewing the temporary shoring plan by Bright Engineering the following questions
must beaddressed prior toapproval ofthe temporary shoring plan
1 8crack monitoring program must bedeveloped approved, and implemented prior to
beginning any work. The proposed program shall include time frame type of
monitoring, qualifications of personnel performing monitoring, distribution of results
etc. boobtain approval |timalso recommended that amonitoring program be
developed which takes measurements of the camber/deflection in P133 and PB4 prior
buand after final loading ofthe topping slab boverify that the beams are performing
as calculated It is myunderstanding that Ingo Go||mrofExe|tenh is looking into this
portion of monitoring.
2. |tappears that the 5^n3|6 x1/4' angles may beoverstressed incombined axial and
bending from the eccentrically applied load on the face of the short leg of the angles.
It is also not clear how the double angles are attached together which could make
this overstress more severe considering potential lateral torsional buckling. It is
noted that the current AISC Manual allows a slenderness factor to provide a greater
Page 2
Gateway
December 3 2008
Ur for angles connected on one face with at least two bolts due to potential fixity at
the ends However the'/ plate at the base is quite flexible as compared to the
double angles themselves and the thicker 3/' plate at the top is connected to double
channels that appear very weak and flexible in torsion that are assumed to be
providing the fixity at the top
3. The proposed location of the shoring shall be addressed for the following since the
proposed shoring location is approximately 19' from the original centerline of the wall
a. Address the shear loads on PB3 with the new bearing location and provide
justification that the beam has adequate shear strength.
b The proposed location of shoring creates a negative moment in P133 because
the end of PB3 is connected to the existing concrete wall. Provide
calculations to show that PB3 can handle this negative moment.
c. The negative moment noted above will imply a reaction onto the shoring that
is much greater than just the simple dead and construction loads that the
shoring was designed to handle. Please provide calculations to justify
d. The base plate of the shoring is eccentrically loaded and calculations must
be provided to justify
4 The proposed plate shimming appears to create very high point loads on the bottom
of PB3. Provide calculations and details indicating the size requirements of the plate
shims It appears to me that the plate shim should match the width of the beam and
the depth of the double angle which is 6' plus the sandwiched %' plate to avoid
crushing forces on PB3
5 Please clarify why it is proposed to create a tight shoring system that does not allow
movement at the end of the beam since a fail safe shoring system was
recommended that would allow some movement in the beam as the topping slab is
installed.
It is worth noting again that approval of a temporary shoring system which cannot be completed
until the issues noted above are addressed, does not constitute an approval of the overall
structure All design questions, which have been brought up again and again, must be answered
to the satisfaction of the City of Port Angeles Building Department prior to the approval or
implementation of any final repair plans Occupancy of the structure should not occur until the
issues have been addressed to the satisfaction of the City of Port Angeles Building Department.
It should also be noted that in the attached letter from Krei Architecture to Terry Weed of Clallam
Transit System dated November 19 2008 it states that the proposal does not reflect on the
actual structural design which has been proven to be acceptable This is not the case since
there are a number of questions that have not yet been answered by the design engineer
Please call me if you have any questions on this matter
Sincerelyy
Tracy Gudgel, P E. X2/3` J
WA$�y
Fc: JN 08091 �.
x
32777
ss�ONAL�yV�
lu
rPRIMO
C � o �
P'OGGEMEYER
DESIGN GROUP
EC 1 1 2008
December 4, 2008 ,
Mr James Bartee
Owner
Primo Construction, Inc.
970 Carlsborg Road
Sequim,WA 98382
Dear Mr Bartee
RE. Port Angeles International Gateway
West Parking Garage
Port Angeles,WA
This letter is a follow up to an inspection letter prepared by Zenovic&Associates Inc.,dated September
29, 2008.
1. The engineer shall address the migration of the cracks in the deck slab from the time of the July
30, 2008 inspection(report#4)to present. Based on Exhibit A,provided by Primo Construction, a
number of the cracks have increased in length and additional cracks have occurred. Please
address the recommendation in site visit report#4 that no physical crack control measures be
implemented for at least two years. Also provide proposed recommendations for repair of the
cracks in the upper deck slab.
Cracks in the structure result primarily from shrinkage of the concrete during the curing
process.The walls and deck are cast integrally but will exhibit different crack patterns due to
having different design mixes,different pouring sequences,and different stress conditions.
The east-west orientation of the deck cracking relates to classic shrinkage patterns in
rectangular slabs.The cracks generally originate from the west side because the slab is
restrained from volume change by virtue of integral construction with the west wall.Along
the east side,the columns allow some movement with the shrinking slab and therefore do
not exhibit nearly the degree of cracking compared to the west side.
Shrinkage will continue for some time,but at least 2/3 to 3/4 of the total volume change has
already occurred.As shrinkage continues,the crack lengths may extend eastward.
Eventually,the entire structure will stabilize(with respect to shrinkage)and the cracks
should close(if not repaired)from the eventual creep of the concrete deck from post
tensioning compressive forces.
Cracking may also be influenced by volume changes from thermal loading.
512 8th Street South,Suite 2021 Kirkland,Washington 98033 1 P 425.827.59951 www.poggemeyer.com
.0
POGGEMEYER
DESIGN GROUP
Port Angeles International Gateway
West Parking Garage
December 4,2008
Page 2
Deck and crack repair and maintenance measures have been identified in our letter of
September 22,2008.
The timing of the crack repair work was noted to be at least 90 day from last pour as noted
in the 9/22 letter
2. The engineer shall provide an analysis of the cracks occurring in the post-tensioned(PT)beams at
the inside face of the concrete shear walls in the east/west direction. There are three semi-
vertical cracks which have developed at each end of each PT beam near the inside edge of the
concrete shear walls. These can be seen on pictures#1, #2,#3, and#4 Please address the fact
that the stirrup spacing shown on detail 8/S8 changes at this some location and the fact that the
shear walls appear to be providing vertical support of the PT beams.
Cracks in the vicinity of the transverse(short)shear walls are likely caused by-
a) Shrinkage in the east-west direction with restraint provided by the shear wall
b) Flexural stresses at bottom fibers of beam induced by post-tensioning
c) Shear stresses
d) Abrupt change in geometry at beam to wall interface
The cracks widths are approximately hairline in width.The structure is not impeded by these cracks
because aggregate interlock exists,shear reinforcing is adequate by design,and flexural reinforcing is in
place to keep the crack width small.
The shear reinforcement spacing reduces at the same location as the end of the shear wall.This is
coincidental only—the beams were all detailed the same even though the beams with the shear walls
have a reduced span.The shear wall does support the ends of the beams.
3. Please address the cracking in the west wall of the structure along Grid Line 0.1. Provide on
explanation as to cause of cracks and proposed repair methods if any These cracks occur at a
number of locations and can be seen in pictures#8, 9, 10, 11, 12, 13, 14, 15, 16, and 17
Cracks along the west wall relate to volume changes,as noted in item#1.The most significant vertical
cracking is located on either side of the deck closure pour These cracks have been repaired by the epoxy
injection method.
4 The engineer shall address the cracking issues noted in items 1 through 3 above with any required
fixes and shall provide a statement that the cracking noted above with any proposed fixes, does
not compromise the structural integrity of the structure.
.U
POGGEMEYER
DESIGN GROUP
Port Angeles International Gateway
West Parking Garage
December 4, 2008
Page 3
Most of the deck cracks were noted to be hairline in width(<0.5mm).Cracks of this type(up
to approximately 1.5 mm)will not affect the structural integrity of the deck slab because:
aggregate interlock exists(adequate shear transfer across the cracked section), mild
reinforcing is in place and cannot yield across small width cracking;and the post-tensioning
remains fully functional.Also, repair procedures that have been implemented are expected
to restore the tensile capacity of the concrete section,according to the manufacturer
(Sikadur 55 SLV).
The wall cracking has been repaired according to recommendations in our letter of
September 22,2008. Epoxy injection was applied and will completely restore the structural
integrity of the wall in the vicinity of the crack.
5. Conclusion. The noted cracking has been evaluated.The major wall cracks have been
repaired.The deck cracks have been repaired/improved with the application of a watertight
treatment. The structure will perform as designed.The noted cracking and subsequent
repairs will not adversely affect the performance of the structure.
Should you have any additional questions or comments,please feel free to contact us.
Regards,
Robert Bourdages,S.E.
Principal
Poggemeyer Design Group,Inc.
�U O
mak, ok NVASN/� -qC
or O
r� N
'O RCI�TEQ� C
All
,\AL
CML ENGINEERING
f LAND SURVEYING
ENOV
� ,Fm,--�-_w
301 East 6th Street,Suite 1
& ASSOCIATES
N Port Angeles,Washmgton 98362
I N C O R P O R A T E D
DEC 0 3 2008 (360)417-0501
Fax(360)417-0514
December 3, 2008 CITY L T dANIGELES E-mail:zenovrc@olympus.net
Mr Jim Lierly SS P
Building Inspector NOISIAIQ n�Iln•nri
City of Port Angeles Department of Community Development S3130M- _ !a
321 East Fifth Street
Port Angeles,WA 98362 90 £ 0 030
SUBJECT Port Angeles International Gateway ® 3 A
Dear Mr Lierly
I have reviewed the package from Jim Mahlum of the Port Angeles Public Works and Utilities
Department dated November 26, 2008. This package contains details and calculations from
Bright Engineering dated November 25 2008, Emails from James Dugan dated November 26
2008 regarding permanent shoring design solution and surface crack physical monitoring plan
outline, and a follow up email on the PB3 and physical monitoring plan outline, a proposal from
CTL Group for post tensioned beam crack monitoring and letter from Krei Architecture to Terry
Weed of Clallam Transit.
The proposed shoring and monitoring program deviates from the recommendations noted in my
letter dated November 19 2008 and brings up a number of new issues that must be addressed to
proceed with the shoring. First and foremost, it is the opinion of this office that at this time the
proposed shoring should only be considered temporary in nature, as is stated on the cover of the
structural calculations of the shoring by Ade Bright, since the design engineer still needs to
address all the issues previously documented and again mentioned in my letter dated November
19 2008 prior to any approval of a final repair plan The proposed shoring concept deviates
from the recommendation since it is being designed to actually support the dead load at PB3 and
is not just a fail safe shoring in case of structural failure during loading of the topping slab The
proposed type of monitoring and the duration of the monitoring have also changed and must be
addressed and approved prior to any work being performed It is recommended that the design
engineer and architect review the previous letters for the requirements of loading the deck and for
requirements for final approval of a fix for the spalling/delamination and addressing the cracks in
PB4
That said, in reviewing the temporary shoring plan by Bright Engineering the following questions
must be addressed prior to approval of the temporary shoring plan.
1 A crack monitoring program must be developed, approved and implemented prior to
beginning any work. The proposed program shall include time frame, type of
monitoring, qualifications of personnel performing monitoring, distribution of results
etc. to obtain approval. It is also recommended that a monitoring program be
developed which takes measurements of the camber/deflection in P133 and P134 prior
to and after final loading of the topping slab to verify that the beams are performing
as calculated It is my understanding that Ingo Goller of Exeltech is looking into this
portion of monitoring.
2. It appears that the 5"x3 1/2 x%' angles may be overstressed in combined axial and
bending from the eccentrically applied load on the face of the short leg of the angles
It is also not clear how the double angles are attached together which could make
this overstress more severe considering potential lateral torsional buckling. It is
noted that the current AISC Manual allows a slenderness factor to provide a greater
T
�. Page 2
Gateway
w
December 3, 2008
Ur for angles connected on one face with at least two bolts due to potential fixity at
the ends. However the 1/2 plate at the base is quite flexible as compared to the
double angles themselves and the thicker%' plate at the top is connected to double
channels that appear very weak and flexible in torsion that are assumed to be
providing the fixity at the top
3. The proposed location of the shoring shall be addressed for the following since the
proposed shoring location is approximately 19' from the original centerline of the wall
a. Address the shear loads on P133 with the new bearing location and provide
justification that the beam has adequate shear strength
b The proposed location of shoring creates a negative moment in P133 because
the end of P133 is connected to the existing concrete wall Provide
calculations to show that 0133 can handle this negative moment.
c. The negative moment noted above will imply a reaction onto the shoring that
is much greater than just the simple dead and construction loads that the
shoring was designed to handle. Please provide calculations to justify
d The base plate of the shoring is eccentrically loaded and calculations must
be provided to justify
4 The proposed plate shimming appears to create very high point loads on the bottom
of P133 Provide calculations and details indicating the size requirements of the plate
shims. It appears to me that the plate shim should match the width of the beam and
the depth of the double angle which is 6' plus the sandwiched %' plate to avoid
crushing forces on P133.
5 Please clarify why it is proposed to create a tight shoring system that does not allow
movement at the end of the beam since a fail safe shoring system was
recommended that would allow some movement in the beam as the topping slab is
installed
It is worth noting again that approval of a temporary shoring system which cannot be completed
until the issues noted above are addressed does not constitute an approval of the overall
structure. All design questions, which have been brought up again and again, must be answered
to the satisfaction of the City of Port Angeles Building Department prior to the approval or
implementation of any final repair plans. Occupancy of the structure should not occur until the
issues have been addressed to the satisfaction of the City of Port Angeles Building Department.
It should also be noted that in the attached letter from Krei Architecture to Terry Weed of Clallam
Transit System dated November 19 2008 it states that the proposal does not reflect on the
actual structural design which has been proven to be acceptable This is not the case since
there are a number of questions that have not yet been answered by the design engineer
Please call me if you have any questions on this matter
Sincerely
Tracy Gudgel, P E. (2l3�J8
aF WAsy�
Fc: JN 08091
°x
32777
SS�NAL�G
COPA Feedback Receive0joday'Re PB3/Wall Connection Shoring Design and Monitoring PlaT-aWT
From James Dugan <JDugan@orametrixcom>
To Terry Weed <hwned@doUamtnannit.00nn»
Date 12/2/2008847PyW
Subject: COPA Feedback Received Today Ra PB3/VVaUConnaction Shoring Design and
Monitoring Plan COPA BODid Not Approve
Attachments Shoring Design Under Lines 12-02'0O.pdf- Nov 1gConfCall Summary pdf- P83'
VVaUDaoignSo/udonOvervimmpdf
cc Jinn K4oh|unn ^Jrnah|um@oih/ofpa us> Ingo Go||or<igoUor@x|tooh oonn> Stan
Torry At 30 pm this afternoon | received a conference call from Ingo 8o||arund Jim Meh|um Jim and
Ingo called to provide me with feedback they received today from the COPA Building Official (BO)
regarding our proposed solutions (sent Wednesday the 26th)for the following three BO requested items
° PB3ANaUConnecdon
°
Shoring Design
°
Surface Cracking Monitoring Program Outline
In short, Jim and Ingo advised me/us that the BO did not approve the documents submitted on Nov 26
They further advised me/us that the primary BO reasons for not approving the Wednesday 12.26 08
submitted design solutions were
°
The BO did not understand why we were proposing a new solution for the PB3/Wall connection in
lieu of answering perceived outstanding questions for more design information
°
The BO did not understand whether our Shoring Plan was a 'temporary' plan or a 'permanent' plan
° The 8O did not want o longby �a cracking monitoring d further did ��hi k
rmuu surface ngmon orngpnognaman er no n a
physical monitoring program was appropriate
The purpose of this email letter to you and copied to Jim Mahlum and Ingo Goller is to address the stated
BO reasons for non-approval of our design solutions as well as provide Jim and Ingo the necessary
information they need to deliver to the BO prior to his writing of yet one more letter to ask for information
already provided
Prelude
For the record we (Bright Engineering PA|GStructural Engineer ofRecord)authorized/directed the
loading nfthe Plaza Deck onSeptember 2. 20O8 When the Plaza Deck was not loaded we (Bright
Engineering)sent oletter onSeptember 18 20O8that stated 'In order toalleviate any adverse long term
effects nfnot negating the post-tensioning forces itinnecessary and without question toadd the topping
slab and other loads unthe Plaza audesigned'
The Sept 18 letter was intended to drive a sense of urgency and an understanding of risk by placing our
direction to load the Plaza Deck in a formal letter that addressed this subject specifically Aoubsequont
structural Peer Review validated that directive and further advised that surface cracking was likely the
combined result of concrete shrinkage and the absence of loading the Plaza Deck as designed to negate
the post'tansioningforoau
VVedirected the plaza Deck baloaded aodesigned and onschedule Failure toload the Plaza Deck ao
instructed by the Structural Engineer of Record is the result of direction received from the COPA 60
_��J ___
� �/ � � y� �
/°��y�p `�"=
12/3/2008 Jim Mahlum COPA Feedback Received Toda Re PB3/Wall Connection Shoring Desi n and Mon itorin PIarP 02A
PB3/Wall Connection
The attached Nov 19 Conf Call Summary and P133-Wall Design Solution Overview sent on November 19
2008 and November 26 2008 respectively specifically addresses and answers the question regarding
why we proposed a new design solution We couldn't have been clearer with our proposal explanation
Page 2 of the Nov 19 document, in the section titled 'PB3Connection specifically addresses this subject.
The 'PB3-Wall Design Solution Overview' goes one step further and provides the same explanation in
greater detail The excerpt that is most important is copied for you below-
"Taking into consideration a sense of urgency regarding 'time for final solution submittal and approval
and continued concerns expressed by the BO for all solutions submitted to date we determined the best
solution was a new solution that would do the following
Develop an immediate temporary solution at the P133 connection location that will allow for PB3
Delamination Repair and Plaza Deck loading to commence immediately and concurrently and
" Develop a permanent long term solution that may be implemented concurrent with Plaza Deck loading
and the completion of the project.
The strategic goals served were solutions that were
Capable of achieving the Building Officials approval to move forward with Plaza Deck loading
' Readily available and accessible by the General Contractor
" Able to allow the Plaza Deck to be loaded as quickly as possible and concurrent with any other repair
work needed
As a result, we proposed what was sent to you this morning a permanent shoring solution that forwards
the project now to be followed by a final design solution that encompasses the shoring solution in place.
By providing a permanent shoring solution with calc's that can support the total dead load we mitigated
other/add'I calculation info requests concerns regarding the delam repair and concerns regarding the
bearing capacity of the wall surface at the PB3 location
We could not have been clearer
Shoring Plan Temporary of Permanent
The excerpt above (sent Nov 26) addresses this question in the last paragraph It clearly states 'a
permanent shoring solution Additionally the attached document titled Shoring Design Underlines
identifies two additional locations wherein this question was answered
My cover email (that sent the shoring design solution on Nov 26) stated the following
'The structural solution proposed is a design frame that will support total dead loads until the existing wall
is repaired and reinforced The attached shoring design will be incorporated into a permanent design
solution at this location Our current thinking is the permanent design solution will be a reinforced cast in
place concrete wall that encompasses the shoring solution in place
Once the permanent shoring design is in place and the Physical Monitoring Plan is implemented the
Plaza Deck loading may progress and may continue to progress simultaneously with the permanent
design solution which we will develop beginning next week following the holiday weekend
Bright Engineering additionally stated the same on page 2 of their Shoring Design Solution
'Criteria Design frame to support total dead loads until existing wall is repaired and reinforced Shoring
will be incorporated in permanent repair
(12/3/2U08) Jim Mahlum COPA Feedback Received Today Re PB3/Wall Connection Shoring_Design and Monitoring PIarF ®BA
We could not have been clearer
Surface Cracking Monitoring Program Outline
Any question regarding 'why' we have observed surface cracking has been answered repeatedly
concrete shrinkage and the absence of loading the Plaza Deck ther@by mitigating the upward camber
post-tensioning forces of the un-loaded structure The BO questionlconcern regarding long term duration
of the proposed Physical Monitoring Plan was answered in the submitted program outline
The scope of work, frequency of readings and proposed duration of readings submitted in the referenced
Physical Monitoring Plan Outline on Nov 26 is attached below for ease of reference
Monitoring Goals
To identify all current surface cracking locations Utilize a Plan Layout, number each location and
provide a digital photo of each location by number Initial layout should be developed based on previously
documented surface cracking conditions
To measure the gap at each location of surface cracking Utilize a millimeter graded rule adhered to
one side of the crack, read the gap distance and record the gap distance Read record and report on a
regular schedule
To monitor the entire structure to identify new surface cracking conditions should they arise and if they
arise follow the above two bullet procedures
" To provide data to determine surface cracking activity over time
• To utilize that data to structurally determine if any additional design steps are required
Frequency and Reporting of Readings
• Readings twice weekly
• Readings on Tuesday's and Friday's
Readings recorded in a summary format or template
Reporting done once weekly
Reporting done at end of business day Friday
Monitoring Duration Recommendation
• Thru receipt of Certificate of Occupancy per the above frequency of readings
• Thereafter once monthly until mid-Summer 2009
• This captures the low temperatures of 2008-2009 Winter thru concrete full cure and into the warmer
temperatures of Summer 2009 one full temperature cycle
Twice weekly readings thru receipt of a Certificate of Occupancy and a once monthly reading until
Summer 2009 is not a long term monitoring plan In fact, if a C of O had been received in Dec 2008 only
6 or 7 total additional readings was proposed
We couldn't have been clearer
Summary
Jim Mahlum advised the COPA BO is in progress with a letter in response to our Nov 26 submittals of the
Shoring Plan the PB3/Wall Design Solution and the Physical Monitoring Plan We will respond to that
letter after receipt and review
Direction received from the COPA BO in Sept 2008 to not load the Plaza Deck as instructed by the
`(12/,3/2608)Jim Mahlum COPA Feedback Received Today Re PB3/Wall Connection Shoring Design and Monitoring PlarPa@®1�,4
Structural Engineer of Record was a critical error Continued direction received from the COPA BO to not
load the Plaza Deck as instructed by the Structural Engineer of Record additionally as recommended via
a structural design Peer Review by PCS Structural Solutions and finally as directed by Krei Architecture
on numerous occasions both verbal and in writing has compounded that error Failure by the COPA BO
to approve the most recent Nov 26 design solutions and in doing so direct the installation of the Shoring
Plan begin the loading of the Plaza Deck, implement a Physical Monitoring Plan and forward the project
to completion is simply not acceptable
Letters received from the COPA that both explicitly and implicitly state/imply that PAIG project delays are
in part or in full the responsibility of Krei Architecture are unfounded unprofessional unacceptable and
entirely refuted I have escalated the PAIG issues to a Principal level within Parametrix and have
requested an internal meeting with Parametrix Leadership and General Counsel to debrief all issues in full
and determine our next steps We will call to debrief with you soon thereafter
Please call if you have any questions regarding the above
Thank you
Parametrix
inspired people inspired solutions - making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone 253 752.9862
fax: 253 752 9865
cell 253.278 8105
jdugan@parametrix.com
From Stan Cruse
Sent:Tuesday December 02, 2008 3.29 PM
To Jim Mahlum [Jmahlum@cityofpa.us] Ingo Goller
Cc- James Dugan ab@brighteng com Diane Lenius
Subject: Shoring Design Underlines
Jim and Ingo
Attached is Jim's email to you last Wednesday regarding the shoring design which clearly says the
shoring will be incorporated in the final wall below the beam
Bright Engineering's calculations clearly says on page 1 under the criteria that the shoring will be
incorporated in the permanent repair
It is hoped you will review with the building official this afternoon prior to them responding to the items sent
last Wednesday the 26th
Those items are on our FTP site
Parametrix
inspired people inspired solutions making a difference
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax: 253 752 9865
cell 360 710 6425
scruse@parametrix.com
Page 1 of 1
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Ingo Golfer Lindsay Murray
Cc: Jim Mahlum, James Dugan Robert Kugen, Ed Horsman, Susan Smith
Date- 12/02/2008 02.37 40 PM
Subject: RE. Punch list Form
TEXT.htm
PA Punchti-st Form _pdf
Lindsay
The form was sent to all and Ingo I will resend it without the November 26 Date
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710 6425
scruse@parametrix.com
From: Stan Cruse
Sent: Tuesday November 25 2008 7 33 AM
To- 'Ingo Goller
Cc: James Dugan, Jim Mahlum [Jmahlum@cityofpa.us] 'Susan Smith 'Ed Horsman Robert Kugen
Subject. Punch list Form
Ingo
Attached is the form we can use tomorrow We can write in the Task No. space the discipline that is making the
punch list. Please print for the Team tomorrow We will be at the site tomorrow morning at 9.30AM.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.Yml 4/21/2009
Page 1 of 2
Internet Message Novell
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Jim Mahlum, 'Sandie Barnhart Terry Weed; igoller@xltech.com
Cc: James Dugan
Date- 12/01/2008 10.55 48 AM
Subject: RE. GATEWAY Bus Stop Shelter pdf
Terry
I believe the minimum base depth according to the information is 1 3E (greater) or 4 5 +inches, hole depth of 4
inches, which would potentially penetrate the 4 inch slab.
We were instructed to issue for Addendum No 7 5'x 13'x 6 inch thick pads for the Bus Shelters to be provided by
Clallam Transit. I would recommend that the shelters be placed on those pads to avoid potential cracking of the 4
inch slabs, even though they are not centered on planters.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
-Original Message-
From Terry Weed [mailto:tweed@c[allamtransit.com]
Sent. Monday December 01 2008 10.00 AM
To Stan Cruse- igoller@xltech com 'Sandie Barnhart Jim Mahlum
Subject: GATEWAY Bus Stop Shelter pdf
Stan in follow-up to our discussion last week about the issue of centering the bus shelter in the middle of the
planter(east side of T-line mid-block) CTS Maintenance Manager Kevin Gallacci has provided the attached PDF which
shows the recommended specifications. He highlighted the area in yellow which points to a minimum of 3 inches for
the base support of the shelter
If you need more information or have questions, please let me know
Terry G. Weed
CLALLAM TRANSIT
General Manager
360-452 1315
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
RECEWE
NOV 2 6 2008
�
W A S H I N G T 0 N U S A TY tYA GEImE
DCOF P( T
Dept.of COMMI Development
PUBLIC WORKS & UTILITIES DEPARTMENT
Date* November 26, 2008
To. Nathan West, Director of Community Development
Jim Leirly, Building Inspe for
From. Jim Mahlum, Civil Engi r
Subject: Gateway Project Delaminati Fix
Attached are the following from Krel Architect for your review, comments and approval.
• Permanent Shoring design and calculations
• Crack Monitoring Plan
• Summary of how Krel got to Permanent Shoring solution
CC Exeltech
Clallam Transit(emails)
Glenn Cutler, Director of Public Works and Utilities (emails)'
Steve Sperr, City Engineer
NAPROJECTS\97 20 Gateway\26 Claims&Liens\Krei delam fix 11 26-08 transmittal to CED.doc
From James Dugan <JDugan aparametrix.com»
To Jim K8ahlunn <Jmah/um0Dodyofpaus»
Date- 11/28/200810.33AM
Subject: PB3Design Solution and Physical Monitoring Plan Outline Follow-Up
Attachments. 1118D8Conference Call Proposal doc
CC' Ingo Go||er<igoUer@x/teohcom> 'ab@brighbengconn' <ab@briQhtangconn>
Jinn This email is a final follow-up to last Wednesday's conference call meeting (see Proposal attached)
and the above referenced subject documents sent toyou this morning
Over the past couple of months we have proposed solutions in response to the Building Officials (BO)
requests for information The first direction provided was provided by the Engineer of Record to load the
deck oo-io. then effect the delamination repair otthe PB3/waUlocation After oround of Q&A and
concerns expressed by the BO regarding the load capacity of the P133/wall location asecond solution was
recommended inresponse buconcerns expressed horepair the delamination patch first, then load the
deck.
Based on continued concerns expressed by the BO regarding the load capacity of the PB3/wall location
even with the delamination repair in place, temporary shoring was introduced as a short term option to
forward the project. This option was conflicted onaminimum oftwo levels odifference inopinion
between structural engineers and the BO on whether temp shoring was required for the structure or not
(and secondarily whether or not it would in fact cause damage to the structure when loaded/un loaded)and
the length of time for the delam repair to cure before loading would be allowed to begin |nbetween each
of these options was a BO request for calculations to support/confirm/ensure all options proposed
Taking into consideration all of the above, in addition to a sense of urgency regarding 'time for final
solution submittal and approval and finally continued concerns expressed bythe BOfor all solutions
submitted bodate we determined the best solution was a new solution that would do the following.
° Develop an immediate temporary solution at the PB3 connection location that will allow for P133
Delamination Repair and Plaza Deck loading to commence immediately and concurrently and
° Develop a permanent long term solution that may be implemented concurrent with Plaza Deck loading
and the completion ofthe project.
The strategic goals served were solutions that were.
° Capable of achieving the Building Officials approval to move forward with Plaza Deck loading
° Readily available and accessible by the Qanana| Contractor
° Able to allow the Plaza Deck to be loaded as quickly as possible and concurrent with any other repair
work needed
Aoaresult, vveproposed what was sent toyou this morning apermanent shoring solution that forwards
the project now to be followed by a final design solution that encompasses the shoring solution in place
By providing a permanent shoring solution with calc's that can support the total dead load we mitigated
other/edd'| calculation info requests concerns regarding the de|arnrepair and concerns regarding the
bearing capacity of the wall surface otthe PB3location
One of the most critical factors in the current proposal is the ability to obtain BO approval to move forward
��(111/26/2008)Jim Mahlum P63 Design Solution and Physical Monitoring Plan Outline Follow-Up� } "..�..,_ Page 2!�
in a timely manner 'Time and the urgency of moving forward drove the last and final solution submitted
for review and approval In short,we could have developed and re-calc'd add'I info requested by the BO
but with no assurance that when done and submitted that the BO response may then have been the same
and given that all info and solutions provided to date continued to be subject to concerns by the BO we
opted to go a different route on behalf of the entire project team
Thank you
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone 253 752.9862
fax: 253 752 9865
cell 253.278 8105
jdugan@parametrix.com
1002 SW 15th Street SW,Suite 220 Auburn,Washington 98001 telephone 253 269 1330 facsimile 253 269 6899
krei architecture
November 19 2008
Mr Terry Weed
General Manager
Clallam Transit System
830 W Lauridson Blvd.
Port Angeles,WA 98363
Re: Port Angeles International Gateway
Sub November 19 2008 Conference Call—Follow-Up
Terry
The conference call this morning was productive. Although we have not received direct feedback from the
Building Official regarding our recent final document submissions,the City of Port Angeles shared with us
concerns expressed to them earlier this week by the Building Official regarding multiple subjects. The
primary purpose of the conference call was for the City of Port Angeles to share the concerns expressed by
the Building Official and to engage a discussion with the project team regarding next steps.
The Engineer of Record authorized the loading of the Plaza Deck on September 2,2008 A subsequent
Peer Review confirmed the integrity of structural design and the validity of loading the Plaza Deck. The
Building Official did not accept the Engineer of Records direction and has not approved the loading of the
Plaza Deck to date.
The proposal below is in response to the City of Port Angeles's understanding of the Building Officials
additional concerns and desire to develop time sensitive design solutions and does not reflect on the actual
structural design which has been proven to be acceptable.
This letter is not intended to represent the minutes of the conference call meeting. The purpose of this letter
is to outline what we understand to be the primary structural subjects and concerns expressed by the City of
Port Angeles on behalf of the Building Official and to propose next steps to address those concerns in an
effort to forward the project.
Most critical is the immediate need to develop solutions that forward the project by placement of the Plaza
Deck topping slab. To do that,we need the Building Officials approval to do so We offer the following
outline of subjects and next steps that we propose to do on behalf of the entire project team to achieve that
approval.
The City of Port Angeles advised the primary subjects and concerns expressed by the Building Official that
need to be addressed going forward are as follows.
• PB3 Bearing Capacity Calculations
• Delamination Repair Calculations @ PB3
• Delamination Repair Before or After Plaza Deck Loading Explanation and related Calculations
• Monitoring of Concrete Surface Cracking Conditions
r
The strategic goals for the solutions/information to be developed to address the above defined subjects are
solutions that:
• Are capable of achieving the Building Officials approval to move forward with Plaza Deck loading
3
• Are readily available and accessible by the Genera}Contractor
• Allow the Plaza Deck to be loaded as quickly as possible and concurrent with any other repair work
needed
• Monitor surface cracking conditions
Taking into consideration all of the subjects,information,possible solutions and challenges discussed during
today's conference call as well as a lengthy and in depth design team brainstorming session following the
meeting between Krei Architecture, Bright Engineering and PCS Structural Solutions,we believe the final
solutions may be categorized into two groups.
They are.
1 PB3 Connection and
2. Monitoring Plan
PB3 Connection
After careful consideration of what has been requested what can and cannot be calculated in a timely
manner and the stated strategic goals,we believe the solution for this category is a combination of two
activities. They are.
• Develop an immediate temporary solution at the PB3 connection location that will allow for PB3
Delamination Repair and Plaza Deck loading to commence immediately and concurrently and
• Develop a permanent long term solution that may be implemented concurrent with Plaza Deck
loading and the completion of the project.
To achieve the first activity we propose the Delamination Repair as designed be implemented in addition to
a to-remain-in-place steel member be attached to the perimeter wall and flush with the underside of the PB3
beam.
To achieve the second activity we propose a new concrete reinforced wall be placed in the same plan view
location of the added steel member attach the new wall to the perimeter wall,from floor to ceiling,fully
encompassing the delamination repair area and steel member and designed to support the full load of this
location.
Calculations will be provided for the new wall. By providing a new wall with full load capacity the
delamination repair calculation requirement is negated and long term assurance of load support is provided.
We can provide both design solutions by end of day Tuesday Nov 25 assuming:
• Outstanding construction activity reports and documentation are received by Thursday of this
week, Nov 20 This is to ensure our design solutions solve a problem and do not cover a problem
that needs a different solution than proposed.
• Outstanding Building Official response(s)to recently submitted BEI structural solutions is received
by Friday of this week, Nov 21 This is needed to ensure we effectively answer any/all Building
Official concerns that may still remain.
t
The proposed schedule over the next week looks like this.
• Construction activity information from Ingo to BEI on Thursday the 20th
• Building Official feedback regarding BEI submittals sent to Krei Architecture on Friday the 215`
• Start BEI design solutions Sat/Sun the 22nd/23`d
i
• Complete BEI design solutions Mon/Tues 24`h/25`h
• Submit BEI design solutions to COPA on Tuesday the 25th
• COPA review of design solutions on Wednesday the 26th Conference call with BEI and Krei
Architecture if any outstanding questions remain.
• Thanksgiving Holiday on Thursday the 27th
• Possible release to start work as early as Friday the 28th—Monday the 1St at the latest
Monitoring Plan
After careful consideration of what was discussed we propose a physical inspection and recording
Monitoring protocol be implemented—both for the monitoring of existing surface cracking as well as for
identification of surface cracks that may yet appear thru construction and need to be monitored.
We will develop an outline structure of a Physical Monitoring Program and submit a draft for initial COPA
and Exeltech review and feedback, no later than Monday the 20
From James Dugan <J .com~
To Jinn yWoh|um <Jnnoh|unn@cityofpo.un>
Data 11/26/2008 9-17 AM
Subject: PA|GPB3Location Permanent Shoring Design Solution
Attachments Structural Ca|cu|otiona_PA|G_11240Gpdf- Field 8ketohes_PA|G_112408pdf
cc Ingo GoUer<igoUor@x|techoom» Stan Cruse <SCruaa8Dponametrix.00nn> 'a.
Jim Please find attached the above referenced PB3 permanent design shoring solution The structural
solution proposed is a design frame that will support total dead loads until the existing wall is repaired and
reinforced The attached shoring design will be incorporated into a permanent design solution at-this
location Our current thinking is the permanent design solution will be a reinforced cast in place concrete
wall that encompasses the shoring solution inplace
Once the permanent shoring design is in place and the Physical Monitoring Plan is implemented, the
Plaza Deck loading may progress and may continue to progress simultaneously with the permanent
design solution which we will develop beginning next week following the holiday weekend
I will post these documents to the FTP site along with the Physical Monitoring Plan as submitted earlier
this morning.
Call oremail ifyou have any questions
Thank you,
Poramnetrix
inspired people inspired solutions making adifference
Jim Dugan
Owners Representative Services
Division Manager
phone 253 752.9862
fax: 253752.988S
oo|| 253.2788105
jdugan@panannetrix.conm
From Karen Fleming [noUto.hf@brighbong oonn]
Sent: Wednesday November 26 2008858AK4
To James Dugan Stan Cruse
Subject: PA|(3 Calculations & Field Sketches
Please see the attached Structural Calculations and Field Sketches for the Port Angeles International
Gateway If you encounter any problems with the transmission of this document, please contact me at
your earliest convenience
Best regards,
Karen Fleming
Bright Engineering, Inc.
18OQ7th Avenue| Suite 110U | Seattle, VVAS8101
T 2068253777 1F 2066251851 | www brightengoum<hMp://wwxw.brightangoom/>
STRUCTURAL CALCULATIONS
PORT ANGELES INTERNATIONAL GATEWAY
TEMPORARY SUPPORT FOR PB-3
PREPARED FOR. KREI ARCHITECTURE—A PARAMETRIX COMPANY
s �
r, %)
4>
{ I00�w ZP
Ali \
t.
1,)A7 1 \ f
DATE NOVEMBER 25 2008 BEI No 116 03R
1809"" Ave 510e 1100 1 Seattle,WA 98101 T 206.625.377' ( F 206.615 1851 ( www brighleng.com I into@brighteng.com
erigk C—ngineenng Inc. Consulting Structural&Civil Engineering
1809 7°Avenue,Suite 1100 • Seattle,WA 98101 • (206)625.3777 • Fax(206)625-0185 • info®bthteng.com
r+ y) e)es It\- 'v ne fioo,c1 6eb" PROJECTNO. Sk-L
SUBJECT 5 VYn A �,� � DATE ,�— L3r! BY N.
I
�56 or, on COOP eflqL
-Mk�e 4��
GAG Y ,tN jL 3oe
�;
-45?Z
c anidk
fv�SL
r.
r
'Bright C—ngineering Inc. Consulting Structural&Civil Engineering
1809 7"Avenue.Suite 1100 • Seattle,WA 98101 • (206)625-3777 • fax(206)625-0185 • inlo66righleng,com
�6 r+ �y��V -OV,y. -14V ra a�VROJECT No A °`
SUBJEcr U DATE BY 3
OTt ,..�
� d �
LA-,Ir,e- CAIX ?,;;If —7
- - j; z 10,
2 ' L.5e 6- f "OA tt-
P i 11 V
Uarc
5 *")c 1
t
Brigkt C—ngineermEj Inc. Consulting Structural&Civil Engineering
1809 r Avenue,Suite 1100 • Seattle,WA 99101 • (206)6253777 • Fax(246)625-0185 • Into 0 brighteng.com
?br k Ah ie)e s PeoJEC'r No.
T N.
SUBJECT DATE 11- 7.5—Ob BY
3 OW
CA r5
--
� T
tti t i1
R
FX rl;
Q
rX .'((y r 78813 ��
k '� d �X sl �s RaL
oe
til
LIP �o�
6 -priokt Qngmeering Inc. Consulting Structural&Civil Engineering
1809 r Averrue.Suite 1100 • Seatile,WA 98101 • )246)625.3777 • Fax(206)625-0185 • inlo®brighteng.00m
k es l r v hc-h otic f Oei�P A/a• PxoJEcr No. S 6cut
Suajscr DATE / A 6-,Oe BY
f312Ir,..
ki
l
19813
�aL �" -�a
I
F LCK
A� � 1
�r
a
61<
Gly S �� ..�� � ��t� A��,
a
S
EA Ci go' Tyf;o ri-
1, �,
t
i
-Brykt Qngtneermg Inc. Consulting Structural&Civil Engineering
1809 P Avenue,Suite 1100 • Seattle,WA 96101 • (206)625-3777 # Fax(206)8254185 • inta®brighieng.com
orf AYl e)QS PlzOjEcrNo. s6«<
N,
SUaJficr DATE BY
O�Jr'V(� BY
L 'K X
PJ
�.3• R'IG tt , i,. �
ICY,
1 Bt3d v1
R LE
.. INA A x
O. . . . A N1?
JoL 7/4 W/4- —5�' 5
vie
... ........
ELSV
.11/0
DET4 11, 3
Y
(11/2612008)Jim Mahlum PAIG Surface Cracking Physical Monitoring Plan Outline Page 1
From James Dugan <JDugan@parametrix.com>
To Jim Mahlum <Jmahlum@cityofpa.us>
Date. 11/26/2008 7:35 AM
Subject: PAIG Surface Cracking Physical Monitoring Plan Outline
Attachments. PAIG Surface Cracking Physical Monitoring Plan Outline 112608.doc; Equipmen
t Monitoring Plan CTL Proposal.pdf
3
CC• Ingo Goller<igoller@xltech com> Stan Cruse <SCruse@parametrix.com> 'a.
Jim Please find attached the above referenced PAIG Surface Cracking Physical Monitoring Plan (PMP)
outline. The outline document sets forth the following,
Prelude
Goals
Data Required
Frequency and Reporting of Readings
Duration
The attached PMP outline recommends twice weekly readings in all locations of surface cracking,
recording of temperature and humidity levels daily at the Plaza Deck exterior area and interior Parking
Garage area, recording of construction activity daily and reporting once weekly to the project team at end
of week each week. The PMP recommends that Exeltech or their designee perform the recording and
reporting
If for any reason the attached PMP is not approved by the COPA BO I have attached the previously
received Equipment Monitoring Plan (EMP) proposal received by CTL dated October 22, 2008,for ease of
reference If the COPA BO requires an EMP in lieu of a PMP we recommend that you Ingo and I get
together to discuss all/other options for an EMP prior to engaging CTL.
The attached PMP will be sent to the PAIG FTP site later today
Thx.
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone 253 752.9862
fax. 253 752.9865
cell 253.278 8105
jdugan@parametrix.com
1
PORT ANGELES INTERNATIONAL GATEWAY
PHYSICAL MONITORING PLAN OUTLINE
Concrete Surface Cracking Monitoring
Transit Building Parking Garage
November 26 2008
As a follow-up to the November 19 2008 conference call meeting wherein we proposed to outline
a Physical Monitoring Plan, the November 21 2008 letter from Nathan West to Jim Mahlum that
states, `monitoring must be incorporated immediately' and a confirming telephone call between
myself and Jim Mahlum on Monday the 24th to ensure a Physical Plan versus an Equipment Plan
was a valid recommendation please find below the above referenced Physical Monitoring Plan
outline
The primary purpose of the Physical Monitoring Plan is the identification and gap measurement of
post tension beam surface cracking and other concrete surface cracking conditions of the
concrete garage structure below the Transit building
The following is presented as requested, as an outline for larger team enhancement and
adjustment to ensure project needs are satisfied The Physical Monitoring Plan outline below
mirrors a similar surface cracking monitoring plan of a two story PT parking garage at Stadium
High School during the Summer of 2006
Prelude
• After concrete placement and form removal, post tension beam and other concrete cast-
in-place structures displayed some surface cracking
• In some locations delamination occurred in the location of surface cracking
• A structural peer review described the surface cracking as a result of shrinkage and
further advised that shrinkage will continue for another 90 days approximately The same
peer review advised that surface cracking activity will be directly affected by ambient
temperature and temperature variations as well as humidity levels and variations
• The COPA Building Official requires a surface cracking monitoring plan prior to any
consideration for occupancy
• Krei Architecture, Bright Engineering and PCS Structural recommend a Physical
Monitoring Plan versus a Equipment Monitoring Plan be implemented
• Implementation is proposed done by Exeltech or their designee
• Reporting from the Plan will be distributed to the COPA Building Official the COPA, CTS
Exeltech Parametrix and Bright Engineering
i
Monitoring Goals
• To identify all current surface cracking locations Utilize a Plan Layout, number each
location and provide a digital photo of each location by number Initial layout should be
developed based on previously documented surface cracking conditions
• To measure the gap at each location of surface cracking Utilize a millimeter graded rule
adhered to one side of the crack, read the gap distance and record the gap distance.
Read record and report on a regular schedule
• To monitor the entire structure to identify new surface cracking conditions should they
arise and if they arise follow the above two bullet procedures
• To provide data to determine surface cracking activity over time
• To utilize that data to structurally determine if any additional design steps are required
Additional Data Required For and During Physical Monitoring Plan Implementation
• All documentation regarding surface cracking conditions reported and recorded to date
• Daily Construction Reports
• Daily ambient temperature and humidity readings at the site both at start of work and at
noon and in two locations; (1)Outside—Plaza Deck, and (2) Inside—Parking Garage
• Record of any special construction conditions and/or activities that could potentially affect
surface crack data.
Frequency and Reporting of Readings
• Readings twice weekly
• Readings on Tuesday's and Friday's
• Readings recorded in a summary format or template
• Reporting done once weekly
• Reporting done at end of business day Friday
Monitoring Duration Recommendation
• Thru receipt of Certificate of Occupancy per the above frequency of readings
• Thereafter once monthly until mid-Summer 2009
• This captures the low temperatures of 2008-2009 Winter thru concrete full cure and into
the warmer temperatures of Summer 2009—one full temperature cycle
Gltow
.. .
October 22,2008 euMVkrravkdaw,0plivannff116901 - CON r aCr14N
T164,4NoWGY LA"RATORirS
1EfiK3dNa&s&. saucnoN
1CHNlr11. O!Co1+RSULTANM.
Email: IGol ler@xltech.com
Mr Ingo Goller www.CTLGroup.com
Exeltech
116 West 8th
Port Angeles,WA 98516
Proposal 33PA08-428: Post-tensioned Beam Crack Monitoring
Dear Mr Goller
Thank you for contacting CTLGroup for your precision crack monitoring Based on your request
for short-term crack monitoring I have prepared the following work scope with associated costs.
SCOPE OF SERVICES
MONITORING SYSTEM INSTALLATION
CTLGroup would install four crack gages and data logging system to continuously monitor crack
movements(every 10 minutes)for one-month duration. This work would include the following:
• Installation of all instrumentation.
• Connection of instrumentation to data logging system.
• Use of all instrumentation, data logger for a one-month time period.
• Hands-on training for weekly retrieval of data storage.
The fee for this Task is estimated to be$9,600 and would include all travel, equipment
installation and expenses for one month of equipment use Additional use of equipment would
be billed at a rate of$1,000 per month(partial or whole).
SYSTEM REMOVAL
Upon completion of the monitoring period, Exeltech would remove package and ship all
equipment back to CTLGroup.All associated costs would be the responsibility of Exeltech.
REPORT
If requested, CTLGroup would prepare a report summarizing the monitoring effort. This report
would contain photos, sketches and plots of data collected during the monitoring period.The fee
for this Task is estimated to be at least$3 800 and would include preparation and issuance of
three bound reports
Main Office 5400 Old Orchard Road Skokie,Illinois 60077 1030 Phone 847-965-7500 Fax 847-965-6541
Mid-Atlantic Office 5565 Sterrett Place,Suite 312 Columbia,Maryland 21044-2685 Phone 410-997-0400 Fax 410-997-8480
New England Office 1 Washington Street,Suite 300A,Dover New Hampshire 03820 Phone 603-516-1500 Fax 603-516-1510
Mr Ingo Goller Page 2 of 3
Proposal 33PA08-028 October 22,2008
TERMS AND CONDITIONS
To perform this work scope CTLGroup will depend on Exeltech to provide access for
installation This will require a high lift and power Additional services that may be requested, but
are not part of the scope of services outlined in this proposal are:
• Consulting efforts resulting from evaluation of collected data
• Monitoring efforts beyond one month
• Repair of instrumentation resulting from construction activity or public damage
• Additional instrumentation to the system
• Additional on-site visits
These additional services will be billed as time and materials according to our Consulting Fee
Schedule(only upon pre-authorization).
This work will be performed according to the attached Terms and Conditions.A returned signed
copy of this proposal will serve as our notice to proceed We are prepared to begin this work
immediately This proposal Is valid for 30 days.
I have attached several project profiles of similar work we have performed recently Please call
me directly if you have any further questions.
Very truly yours, . Approved:
Thomas L. Weinmann By
Principal and Group Manager
Sensors and Structural Diagnostics Title:
TweinmannOu CTLGroup.com Company'
Phone (847) 972 3280
TLW
cc:
1. Kirin
J Juliano
A. Bassam
33PA08-028
CT Roup
'810*9 Kn_W9G.Dkwoft Ate. eww.CTLGroup.com
J
CTLGROUP
STANDARD TERMS AND CONDITIONS
SCOPE OF WORK. CTLGroup shall perform services in accordance with an OWNERSHIP OF DOCUMENTS.With the exception of CTLGroup submittals to
Agreement made with Client.The Agreement consists of CTLGroup's Proposal Client, all documents, Including field data, field notes, laboratory test data,
and these Standard Terms and Conditions.The scope of work,costs and time calculations and analyses, prepared by CTLGroup as Instruments of service
schedules,if any defined in the Proposal are based on information provided by shall remain the property of CTLGroup. CTLGroup will retain all pertinent
Client and shall be subject to the provisions of this Agreement. if this records relating to the services performed for a period of sixty (60) days
Information Is Incomplete or Inaccurate,or If Client directs change to the scope following completion of CTLGroup's services. After this period, they may be
of work established by the Proposal, a written amendment to the Agreement discarded unless other arrangements are requested and paid for by Client.
equitably adjusting the costs and time schedules shall be executed by Client SAMPLE RETENTION. CTLGroup reserves the right to discard samples
and CTLGroup as soon as practicable.Client is defined as the person or entity immediately after testing. Upon request and at Client's sole expense,samples
requesting and/or authorizing the work,and in so doing,Client represents and will be stored or transferred.
warrants that he/she Is duly authorized in this role. The acceptance of SUBPOENAS OR COURT ORDERS. If any subpoena or court order is served
CTLGroup's Proposal signifies the acceptance of the terms of this Agreement.
INVOICES.CTLGroup shall submit invoices monthly and/or on completion of upon CTLGroup and/or any of Its staff, subconsultants or subcontractors
requiring the presentation o documents or appearance e a deposition or trial,or
work for services performed and expenses Incurred and not previously billed. for other discovery purposes, s
Payment Is due upon Client's receipt of the Invoice,and is past due thirty(30) ses, arising out of services provided under this
days from the date shown on the Invoice.Client shall Inform CTLGroup of any Agreement,Client shall pay the charges applicable to on an act compliance
disputed charges on an invoice and the reason for the disputed charge in with the subpoena is court order. Charges will accrue on in actual time and
writing within 10 business days of receiving said Invoice.Client agrees to pay a related expense basis In accordance with the standard rates in effect at the time
tservice upon CTLGroup of the subpoena ncourt order Invoices oc Include
service charge of one and one-half percent(1.5%)per month on all past due time and expenses Incurred gathering,organizing and duplicating documents,
amounts. t
preparing to give testimony,travel and testifying In deposition or trial.
STANDARD OF CARE. CTLGroup will perform Its services under this OPINIONS OF COST CTLGroup's opinions of probable costs,If any provided
Agreement In conformance with the care and skill ordinarily exercised by as part of the services under this Agreement, are made on the basis of
reputable members of the profession practicing under similar conditions at the CTLGroup's knowledge, experience and qualifications, and represent
same time. NO OTHER WARRANTY OF ANY KIND, EXPRESSED OR CTLGroup's judgement as an experienced and qualified professional engineer
IMPLIED,IN FACT OR BY LAW IS MADE OR INTENDED. familiar with the construction Industry CTLGroup cannot and does not
SAFETY It is understood and agreed that,with respect to Project site health guarantee that proposals,bids or actual costs will not vary from the opinions of
and safety CTLGroup Is responsible solely for the safe conduct of Its personnel probable costs provided by CTLGroup.
In the performance of their duties.It Is expressly agreed that CTLGroup has no LIMITATION OF LIABILITY THE LIABILITY OF CTLGROUP FOR ANY
responsibility for the protection and safety of any other persons on and about REASON WHATSOEVER ARISING UNDER OR RELATING TO THIS
the Project site. Unless Indicated otherwise in the Proposal. Client shall AGREEMENT WILL NOT EXCEED IN THE AGGREGATE$50,000 OR THE
provide,at Its expense, all facilities and labor necessary to afford CTLGroup AMOUNT OF THE FEE ACTUALLY RECEIVED BY CTLGROUP WHICHEVER
personnel safe access to sampling, testing or observation locations in IS GREATER. IN ADDITION, IN NO EVENT WILL CTLGROUP BE LIABLE
conformance with federal, stale and local laws, ordinances and regulations. FOR ANY CLAIM OR DEMAND BY CLIENT OR AGAINST CLIENT BY ANY
Unless access equipment is provided by CTLGroup, It is understood and THIRD PARTY IN OR FOR ANY AMOUNTS REPRESENTING LOSS OF
agreed that CTLGroup shall not be In charge of,and shall have no control or PROFIT LOSS OF BUSINESS,DELAY DAMAGES OR SPECIAL,INDIRECT
responsibility over any aspect of the erection, construction or use of any INCIDENTAL, CONSEQUENTIAL, EXEMPLARY OR PUNITIVE DAMAGES.
scaffolds, hoists, cranes, stays, ladders, supports or other similar devices as THE PROVISIONS OF THIS PARAGRAPH SHALL APPLY REGARDLESS OF
defined and Interpreted under any law,ordinance or regulation relating in any THE FORM OF THE CAUSE OF ACTION,WHETHER IN CONTRACT TORT
way to Project safety (INCLUDING, WITHOUT LIMITATION, NEGLIGENCE), STATUTE OR
HAZARDOUS SUBSTANCES. If CTLGroup is to provide services in the OTHERWISE.
general vicinity of a facility or other area where any substance which poses or INDEMNIFICATION.if any claim,suit or legal action arising out of the services
may pose a present or potential hazard to human health may exist,Client shall under this Agreement Is asserted against CTLGroup by a person or entity who Is
Immediately notify CTLGroup of such potential health hazard which It knows or not a party to this Agreement,Client agrees to indemnify,hold harmless,protect
reasonably suspects exists and thereafter CTLGroup Is authorized by Client to and defend CTLGroup from and against any such claim,suit or legal action,and
take all reasonable measures,including suspension of services and termination any and all loss, liability damage, costs and expenses associated therewith,
of the Agreement.CTLGroup deems necessary to protect its personnel against kept to the extent that the event and/or damages giving rise to such claim,
such possible health hazards. Client shall bear the direct costs of such suit or legal action is found to have been caused by the negligence of
measures. In the event samples collected or received by CTLGroup on behalf CTLGroup.The Client's obligation hereunder Includes,but is not limited to,the
of Client contain any substance which poses or may pose a present or potential payment of attorney's fees, court costs, and expert and consulting expenses
hazard to human health or the environment,CTLGroup will,at the completion required for the proper and vigorous defense of CTLGroup,
of testing and at Client's sole expense and responsibility return such samples
to Client or upon written request from Client,release such samples to a carrier NO THIRD PARTY BENEFICIARIES.Nothing In this Agreement shall create a
for transport to a location selected by Client for final disposal. contractual relationship with,or cause of action in favor of,a third party against
ENVIRONMENTAL CONTAMINANTS: CTLGroup's scope of services Is Client or CTLGroup.
confined to those items described In the applicable proposal or statement of DISPUTE RESOLUTION. All claims, disputes, controversies or matters in
work. It does not include the identification, testing, sampling, removal, question arising out of, or relating to, this Agreement or any breach thereof
abatement or remediation of any environmental pollutant,contaminant,hazard, which cannot be resolved through negotiation shall be submitted to mediation
toxin,condition,irritant,material or problem,Including but not limited to molds, before and as a condition precedent to any other remedy.Upon written request
fungi,bacteria, mildew, mycotoxins,spores or other irritants of any kind.If in by either party to this Agreement for mediation of any dispute, Client and
the course of CTLGroup's performance of its services it observes said CTLGroup shall select by mutual agreement a neutral mediator If the dispute
conditions, or falls to observe said conditions which were otherwise visually cannot be settled through mediation, then such dispute shall be decided by
detectable,Client agrees CTLGroup shall have no liability to anyone relative to arbitration in accordance with the Construction Industry Arbitration Rules of the
said conditions.Cilent agrees that CTLGroup will not be liable for the dispersal, American Arbitration Association (AAA)then In effect.The award rendered, if
discharge, escape, release or saturation of any environmental pollutant, any by the arbitrator(s)shall be final and binding on both parties and judgment
contaminant, hazard, toxin, condition, irritant or material in or onto the may be entered upon it in accordance with applicable law in any court having
atmosphere,or on,onto, upon,in or into a surface or a subsurface in,on,or jurisdiction. Each party Involved in the arbitration process shall pay all Its own
around the area of CTLGroup's work. Client further agrees that if a claim, arbitration fees and costs to the AAA and shall share equally in the fees charged
lawsuit,arbitration,mediation or other demand is made on CTLGroup directly by the arbitrator(s). All mediation or arbitration shall take place in Chicago,
or indirectly arising from or related to any environmental pollutant, Illinois unless Client and CTLGroup agree otherwise.
contaminant, hazard, toxin, material,irritant, condition or problem,the Client TERMINATION. This Agreement may be terminated by either party upon at
shall defend.Indemnify and hold harmless CTLGroup from same. least seven(7)days written notice in the event of substantial failure by the other
DELAYS.CTLGroup shall not be considered in default under this Agreement if party to perform in accordance with the terms hereof Such termination shall not
Its performance is prevented or delayed by any cause which is beyond its be effective if that substantial failure has been remedied before expiration of the
reasonable control. Further Client understands and agrees to pay all period specified in the written notice. In the event of termination, CTLGroup
reasonable charges associated with any delays,cancellations,rescheduling or shall be paid for services performed prior to the termination date set forth in the
other activities that may alter time schedules and anticipated costs and that are notice plus reasonable termination expenses.
beyond the reasonable control of CTLGroup.
Rev.512004
�-�,q%ts;;;�i:�--,i 1,'-,:z ,�,-��4"^!'�i',�.,i��,i-,,�-,-�4�i-, -g -,,��ilj"q�-, --mll-1.1-1 I -"
_ -- 7:�...,I�,.--t;;,--,:1-�'I�,�jl tf�i-%t�"�',,Ij:, ,r,!!�t,it� 6,.it j ', -
z-�,,�-i-it,z,,,-!,i-,�t-,-;,p� -, q -. ,ig, p-�,--= ...;-11t... --i- -�;
--lil,"tIrl,;--� . 1�'t-l- �ii�l�'i�!��,�"'�;"."�,,���"l�,��,;-,�,,'�?"YI"',�, �;,`��-�ttt�,;--;:i�� �A�-�,�.;";��,��tj�lkt,�,.,��'�,,!.�i���^,r,'il!,L,�:��-��l,-,, -- �
, : -- , ^- " 'k'V,'1&'-t-0 i;--,-,-,',f��if,�,,t,�j' . `" ,-. . �z, �,
— ., - -I ,,f i�tj ""'" "t, ,. -�Iltl,�-.��-, ,
,li", ,i;�,��R - niF - -it;;it -9,I I. 1.4,;,�i�i-ti�,�,��g��,�Z'�, -5,fln, --,,,.!..;,�7,�,,-,-,��.-,',-,'.�,----i����-�,�-,�i-�, 'q�,,�,�,;,���7,i,�1:111",-Ii��-e�'t=�---I�
I Atzti,1-K,— I I'N-t-.-I�,"Ill:1P�.:f� ��F
-,;";z;il-, ,-�fdi.l, , � - "'ja
, M-; 1�5, �, . � .,,� ,
t:t�j&,�,�n -, -� ", �.-"b,�""",,!�",�i--,.i��",�,i�,��-��i��l;,,-,��`N'i;,,it.`,, ljjli�j,, ," --,
-�i",�i,- ri. . ------ '� !,R , -P��� -,2-M, 24--l"t - , ,iil-,---,; .-",�t;l�1,71-��:"�-li,�,115,1�,
, t-4�" ,I 1. ,
---:- . ��,��ili..�',i����'y,,'i,--��"F..-,-z� 1-1.1--..�Za 4-1."vwa �,i,';� ,!, -,V,-----"""�l,,��,��,!,si.'��-I I � - --
'.
- - -,i,c� -- .-t-3q,t-,qffi�i"I.�-',�'.�,-,�,�,����,ili�'�'�,,Ii!l,l�i'-',-�� , I 101t,N%��il -��,,- -- - - "" " , ,- --
�-11-1-1.1.1,5,7"t ,L,�"';, TV!, ,",�,, .,�,t,7 :i. �4" �t
"t '� ",��---',,���',��-,z,�c,��L�:!:144""�,�'i, ll;;�%,,-!,:i�,, . - - -zt.-,.� � -,�,' -,it tt'!,-,�i i �z5,��311,-,P'FMIIT'!� ,,-- -.1 If'.,-tt
:i, �-��-';;,�5�,.,��7-��?,�.---:�.-,z:,�.�l',-v,�,jliA,i,,?;:!,�,),4��,t�t,--�,i�-c-� ,t,"� --:, ',�j=.:z-,4!-i,�,;�,,,��,,,��",�I����'"?,"���iti��,f'i-"�������z:,�.�tti�,�t--,§��,7M--�,74,,-�",t.�,f'." -i�;;�i;;,t?,,j�i,;-;., -� �2'.
. ti
. ti
. ti
. ti
. ti ,-
- E*�� -,-,�-;�,��,-.�,�j",�i�"'�,���,-.1��l :_- -
, :R�,t, "
-
, ,1,1�,'-,,--,r;: tt —- — - .:.lq --- , l�,�.) I'Ll 11 ,I -6
. I ,r , ,;��- - , ;. ,ii ;.----- --'T 1--�, --� I �
';t� - -, -1,"ti,'It. - �� , , ,,, , � , �
- -....(-t, , ��,",, V,.�_,-isjt��,�,',�",�, -,-'�', , `a.u.-ti""ji"'Ptit 1,,,'�,- "'-.'�,I T���,�-',-�,,�",*��s�,"�"'.��-.,'������'-,
,;"-���--i�l,,z��,i�,�,�,;z�"q,���'.."�,--, I ,151it -..31.,; -,--'�,�j��",,,----- "--......57,;w"�)tnq-,,��,ly-,�li�!,I,i!:.":��5�!�-�,z:�:��t,:����,,-,--;.-,�,,�,��'.7,);��,,�..��.
r, -",�, `5;i.......�" ;--�
,f , 1� ,..�-titj� - ,- .-- ,
,i�� , ,, , - 1�1�, I ... - - -
, X�-'.,-.1-11 R -" �` --- , � -��,�!�i,�i it i�;"j,�,���-',, - � ,. .",, .,��,.
- �: ;.f', 'i, '�",'��:� -�!--* i;�`P` Rig -- nt -1�, .�,,,iif)-.!;-,I-��,�-�K�-,'�!,Z
-.1�.�.:.,.���,�-,,:-����;.4�)."T;.;. , 1.;-,"-,,,,I',,---,=a-z9ji!Mj'j"'i`,I,tjN,jj,�e,j 31� -�,ii�iii�'i-�,�.,.-.�.,"i�:i�:��'�,'�'��i:,�;��::��'--,----- --lc�.Iil�:� I - �, ,
)�,,17111,1i4�� -,
, , ;--
!;".:t
'. . �-- - - -- - -- i i ;-.,- t��ii�i�
--tfjj,:�c!,:qj.j i!i!1�1!;!t',f-. %IF�,�l�����,��.�,�'�.'i��,�,,�4i,'.lii�)�'�,.-i!��i,',[�tij,.�;.,�.,�:,,,.���.��i�:�i"ll�,�-.i,��.� ,-�
- ,, kig'! .,;" -q IT�l 21 ;M1mHM111;�! , _Z,� ,.�,;-,i?,,;!i I.i It E�,i I-�.-
�,',;,`,,` I -K�t,�4�;,4z�,Ff��t��", ,I t,- -- 1 .,- ,, -��'�,.-'- ,,�U�,��-- --*,I�j�"z��
.,
-1�,-' i' ,;� - - -jji� '. �:�e---�-.�_ "It"" �O !"N,-,wiz'�51111,,, t,'%,
z ;�;i�::ri�.!.';,it� ,I)jilq�;iliiii�i��jjjjji� ,I '11 1, I I
-.�:� �."�3'�f�'�-'���,i,,t:,��,�:,,�.�,�'.�""��i �, ,�.,011iiil!�..".",",�!,���""�"-.-"-.!.".,.j,2-i jijiltji j"lliliNdif jilli illl-"Ilti.".�i�t,:.Ii,-,.i�;,I�:������������;�:�---......--_ ,-.1.Z;-!.1,Ijl�l,11P d;, , O
,","" . t�!Fs,�t�)�tt,t I�t; yI t!� -- .1,
- ��, �11�II;,,�;�14,i'-�,�t,I�- lit';;�;.Ii -...1,�?I-;,.1
-,�-7�,,,,,.-,",.'j i;;:�f 1�� --�;;;,t; " r�i l� -�;. :
,1��,'fig-i�i�,�"",�,Z�,i!,,�",�ii;t�i'l�l��ii,:,�;-��t�l�,�,i��,:--,:�', i,,vlsS,;'-�;:, I I "'It1�1--,- ijjz1ji;*itgj,�q,t:t 1'�I I m; �
1 :�� - - :i! t",!�i�'WK----N :!;i:.,tt ;t,; � .
I
!i�,-�� .- -..-.-,_--. , , 011�-i-. , to;---;jt-,,,0,-.i�i ztt '.t:.1 ����;:;�--,'.-.��I�.ivtl;,�Illi�i;!!ij�
ji;i�-j�.` -;-'!',!�,F�1:,ii1i;;1:"1fWi,:i;t�,-ii1 llfi�,��114.-M r-;;;�
It ,�,,'��'i',,J�I�i`f,-'�!!�',4',I�;��IV,l�t,�-,'��:�,��gi��,:,�, " ",tl',--,w,.Ii..", . ,��'�t'�.,� i
�
-, !�;�.',,�� i�.',!�i��;&,�jj�jj�;!!!, "W:'-,!:§ -11--L , , -...-1.111 I-1
, "..i,". ,� .- ttl��-t�:tIl-,.- ,�,,�---�,.��,�
it%,4,p:,,'!�,tit:!!,,�,t -Vtiti .4� ...�
;!������-,ii�,���ii��l.'��,'-,�",P.ii���*��t.z-". , , ,�!:fi.-:---�,%j "1,t'At 1 ��i,,-,'�,']�-��E
, g�;, �t - - - -
- - R�-,tpg , - , " , �Ii i"..I -
- I ",
ii-, -i i-1-11% .. 7,,".ilg,-�.........r�J� t�ii-�.�.......��--i.;-'v,-. ii� -1-111,11i'll - -
-- ,- -, - -�`R�' 'It��i-;;I�;Lli-z�-��i�:.---�-,��;�'�'�����;���i,-.�-,;,"�t�F.�::�4,�--.r- -%M, - 14.,.I�l-l�i��"",i.11.";Z,!i��l,,'���;�ll�, , , MM "
�1�7,lf',.i".,--�;-;Il���j�i'�i-','�'�'-)I; - ml�I,.-j,'R.��I- - ttt� ...11.,,--�,�--------.I--= ",, - , , ,-,0;�-.1;-4-:,.- , I �- i�-�.,-,-,-7';,,,:-!', lg--��
-. , -;n,�m, ,-,,I��,"',-,,--���i,�,--.g��-,',�;',?-��,i�l�,�'r�,�!, .- -,-,�' K, -
-�...- ,- "', � - i II!,.. �
1 I'Z�r-z�� -- , - 'M n..",j ,. , ..'�,� . .I
��!%-,.'L�:,-- "i :l�lj�.�� ------I I .��',
,j��,"";�c,,�Iillt'ii,jjl�,;-,t�;'i� , ", `t'--Z�','.i, �1 ; � �7,�--�fc.!�����:,.
.111-1.11-1,-.-. -j��;ii�-,,���",I"-i-,,,;-,4.;;;.--��-�-��il'��t�t�;�,)qj��,��,--�zs -- -.��,-:Ti!,� ----".:-,'-.`a`:,:---,',,j----�t:,��
.., 5z im �, ,�� ,1, -'�� RN�--,-�,T, v;:z� �
" i�! i-,,-�-ie��l,i,,,"!,-'.I.".,,'��.�-,,'!�,,�?",�,i�-,!;,�'mi,�,�, ��,%g I 1. -I�, --.
11 - '�!,��4, -- i"---.�Z�. - �7:71,-,---
`-
-""---1'2�lil --,-',,,�,I��;,I�;,-t�., � -----'i,111,111" ` 0 1 i`�i:i , ,��-_`.�:�;���i-:�,,in,1.
z! :-,,�"".�.,,��-,�i,!.���,.;.:��7,���-,, ---.
,:,k-t��lz�!!�. 'I H�-,f.�,.-�;�,������i'.�i;",��ilit�li��.���:i,.,,ff---.7ft7--:z ff-, if-�'t-'�;�!�,,���,.-,!,I�,i;��i.--�-i,,���,.,;I�-Itz"�----�--.,,__--,�-,--.-,-.,�_---L'��,,��--2K---�,!t,'F;4�,I.
.ft,� qj,ijti --- " �:i-,�i� - ---I�-',�.-:1:
- ,-.-, I�,. -11 w-41- ., .- .... -
- 7-�i; �,',�ti�,�,'0,%j�,,��j i',�.�;�-,V�!JRRQ��F'ff`,, hl;:;!� _7 it- ;t,_L_" .--- .-Ti�:!�
ir ---:��a� . � � --�,
1:;1 ,k'O";A ,:��,-��:�,!,',�:,',',',����,'-',7��--,,���-,�,ii��f�,,�,�'I�ji;�,���'����!0,,l���-,,!,,,-�� --�.-�:ii� �aEartit'z�;�i---a't:�Z,�- 1; I -a�,��-,,t
'L Alil:�--,44 I- --Wi�: .-
-
_ , -,, ,
-:�-��i��,�tt"--`;��-,�'-si�,�-,-!;�..��1.1��,v�U,,;4�,;,J�;r--= �=-�� � I,,,'�, -.. Z--;!t-� " .. I -
--,--fZt:--:1,-.',wt�j��1 ��.-- . , ��,,-,!,�,'-��,- W ,
w,eftt-',�tz-.'1,zlri,!i7t�.:Izt�,-i��:�;!'"71"', -j--,:i.,�' ,,� - .�11:,, 1—
, r:I I ,it -t!
` - - - - ,I .-.11
� ,�� �--�`3,?-ii i---,..�',. -- -,.g"A Z-1.1, .
g,lij n!..I'-1�� .:...rl�--��z�;:--t�
-d�,,t:fi�!�ta:p:It �...f.
.-: -.
�;
.. t�:�',I�t�iz,-�.:�--E, ',..-- , ' `� �I�,�,`
-,i",",��1 i""1!�1�I.,f",''T�!1,�i 1:��,.".".7,v",,—;�r,�g
��'j'!�.',�T,,-.YM`�� .t M- ., . 1$,-j-,i,'�-'.'.�;��-,'Vi", Hf , ."R
,...�It,.-Ati.,� ",;-`i';!��4 gj!��1-::M�Illf"fliffiNN'g.,�,11liT�ii3��fi-�'�,---z--�ii,',O�,'ii����,,,��,�,�"'�.,?,�-:,I":;,A �,; ,pi
,,�,
.I
�,,.,-.-,,,,--1,1---- �`4 --e;-i-..1-, it'-,;->,�P1
4e.fl"jMj�:;j! "�i,li��.11,�,i!�i�i�iq;ili;"E��i��;:i����tl� , . ?� ,,,g&wR,1' -1
1��:�:!�,.��-',�,'�`��!�r=f.-v";t-,,4-i;ti`1jj�[ I "Iti ilw_:r� ..` i il t
2 ,;,;-T--,"', , -��;�i�,�ii;�jt-�ij��;',,'� ",, I 11 a I
,-..."--- � �tt�ijtil't�;�;�Ni iPWTM��M�j- -,-I I-I,--,' ji'�'i I'll, .i
'�7-�. � , gfpjj�i!�j�t�,!] .1,�Ni�,:t!�P-!%,!�,,,,,%% �,,,, ;��i;ii�iq��; , al,1111 R ;i"
- N � K,�;X,�N I",
, � �7�,
-,!-'r , -�!j:!"11",?-,�q��,.';,�;' � - , j�lim��!,�,ll�j!j%'Iil -...
,,�.',��,.i�, :i��,;!:�!gjqi)jq ii�;- !",�.iti.
'i-,-,O-z,,:;";;�.1111 1:,��.......�,,,,j-,jj.%'.14;i1.i1tz�1- �� I
--f-�0- 1. '�� .�-... � ..
- -, -� ;, -'i 1114�----1, -,"A,, 'Iiu��:i.ti� =�,,, .�I I �
1'6,'�� ., . y�-1 I It
� -. . . I I z11 ,��ty .,�I I -i -,,�!l-
. ,it;
I - 11 .
, -��,,.:���,�l,�,1,'�771t",i,�i� ,��,4;`!K,��" �-iI.,- -!,ii-m-1`4�1'zi",,I 1,til�j Rr ,�
��,-���-"�l�'.;'�,��,,��,,'�i��*,�_;,,,�,,�,�',t�i.�,'..',�,,�',,.-, , .�!,�!,� � -"I � I - . � � f
�
,
'�ji ,z�,,�i�.,Ii;T.���ti";]��iil-,',,,,�.,,,.;��i,'�,-"��i,,�i,-tilim�,ll - - " I
-
, ,� -
��'�!:, I,I N ,
"I �, ,, - I
M
- ,
� ,2� " "" ,� .- -1,- - -a-- 1,
,, p
, - - , -.: .:`�,:"�., .41 ,
,,,,q,.:i;,,,�-,, 17.--- , ,i . I'W"'lign,www', "I'm �,
".�t-,.,-.r.-.i 1, -
�e4-,�--Jri-..
it,:1,�t,=--ti:t-t-�=, -,,_-�,;
, -=r-I"! �',��129?;, 4T'--�-
"
-�,.-,-.--, .
-1 - 1�--,EH�g - - _,��,
,
�:-,.,�%,,,�� -- . .. , ,� , ", �
1�,:-,, -It .1 ,. , , I ..-- .,,.-i. 11:-.
it., ..". �; :q, A!, 11. I. i,-,,�-'�'i
�,
�z Mlvivll qy�,- -"�i;"�i�.�'�-,,�.���';����,'i�.,;,�� ii::�i� I ."
l " t
I
, I
,
��111 F I I, ;it 1.T f t��i
�t � I ,�.,,t ,..
"
. g1j; it 1:;;�� �,-,�,', * ",- , i,'11,i�ii ,
, M;1 z
Ai-a,, 1�'1111111N,,P -. �i; ,��...�.,-i
I 'Ili, �,:,;i j�j',�J�Ij' , ;!:t ,,,�
�!- ,I �'.���,il;lii�!il,;i�i��!i��l�l�j�l',�,.,�.�;�',�'.,��-.-i���,�.""��M., -t ,,�j�.'
I 11 -�,�i--L�f',j
w 11" I ., --- " .-
1z �,G;�111'it ;N, titi�� - , . ,
,�t I.........9 J-., --_._._ -
1�1 ,t, 1:t ..".. . . _
I-. I (^�Iv 1..;7�-E%-, ��i��,`T�,--`,`��,,M i,,".'...
.
'?d--fp.-,-,,'-f, 7 .�m�'�t;t",��.
,�� ,,,i i�",�1,1-11, ,ill 1-1 - 1, tm`q"�-�!-,�'i.' ylltig-�VOT,,R;�� -�
, .1. -;,r�-'i;'� ��gr .11 1�
,;,z.�Yt�-,'�,� -..I I--�----�--a-- ��;
,�, inm I 11 ;i'R�,- � -�f:4'tg -��,�i:��::r:-,z�1'^'ii-T-:�;,-'.-,-- ,-1,111"!�� -,,I
� "'ki, I
, -
-1* I i '..�.. r� ,z�.,�!ii,.c�,z g"i i�f�P�,,1�:-io, N
��11: -�,��,-.'t�ft.,,.-�- , , - �1! , �A I, - ,j�l, --:�=-i I :::
-t"
; 'I't-, -11- � , -111-1-1,1111'-�-N'11- -�i:�i.��'.-- - ,7-
, I'll, -�! ---7-� ,;!!..
I-, ::tt:lt,�7-,�,�,7.,-,-,--- �---,:,--"-r"T'.�t-��-- ""t1.1,V-bT1f; - z... ",
.-- - - -�;,,��izt!,� , it -, I ,�,�:,-;-t� ��
�':t----, ,iv c, ;; Z I"I- - , -;:-j,;r.-, irzF-�t -,,:�,"�
-
t
� ti_-= .i��,c�',,:�:'��',�:!- .-v 2,t3� I-,iltal-.L'�-,.�,i,��;j!t -,, ,,;Ii.t��:;
-- � V " %Jiffil�lt,��s,�-*'6`mi:t:�,� ---.-j,411, -
, -
- -�.�. -""'i, i--�� -- ---�7i�.�,"�........,--..........Z111 I � ,g �
�,-,, - �f.,.��t,ai�q,R;- �',:�i=. :,�� � I�'t, , - % -.",I 1- '��fl�jf`;����;,','?-,
� =�i`.�,--,---),-.,,,pZ,,:.-ttz:-� -- -�5�, `,;��--- --,2��-`��":��t�.:�;�,�� ��m -1�t,i�,,- .
�
E- �:��iv� -,!`�-4y!L"4 � - ,,,�
�� it,--- -��'7�-,��ilf���'�--.,,-'.-,--,��,-�,_,i-,�,-"t";,,�':j�, - ,M�+'tviRl I tU -
-� ,,.71 - -
- - -- , ^ � ,"Ittt 's!-�,� -7 tt�;� � -.- -;-,, "',4 , 'I ,. 9
-1-.---.---- - - �;,� � ,; -g, " '�,`.'��.,," , ...66 - I
--, --* - -�,Ilm ---,��t�-7 ,E'�?�itt � - t�,t -, ,,7,�,�,-,
-!,!-`,�� �-"��f--'-,�.,�* 2""'i'la), ili-,,�� ,-�- .'., "', �-'i..""'7 ,-!��1,1���-�.-�.,^-'�i�!'�""�,���.�-i;�Q "a.,,
�
,-
�-��,!,-"-,-�-`�!�t�! 4,- ,. ��- 11.1-1-..�� 'L,;� -,`��,,--'='� -i,`,�,`t'��'�",�,�, :!�,��1 4 ti,:,w".v,it
..,.. --, ., " F;;. 4�
... 'I - -----�U- "f- "I
'�1�-1--t -1i 1� R `�� -,",�, --�, `-� ,-i:;�-tt�----�'T, 1-1 , , , It -: p
, - ., -� .? , :,z Wti:.-t,�!:
-�qfw,,*f�,Ql ill-,�-I.?"�, ,�r,,'.-�,O�,�-��:-_, ,'�.- " ,Z'�,�i-,.�,-i!�:5.11 !�iT' -'-PF'-- '-JI'n�,�-m, -1."',i,� --`-In', .
2$�.t�-5R��If flil � 0"�'�fm'ljll .. ,,, r Z:Zit� --�:;��*�-��j,!�Z:.
.--......I j".1", - --- - I.�:�11 .- ",, -',;�"!JL43-,iL:,t:Z-
���-2-,�-,',�.!fjfe,�,,�:�;����:--,-�,.�.-,������',,--,.�;.�t 'j�:�-�', ,��:, ,��,, --t*i!� ,-7 t: -i-' t;t�i�,�-,I��, 'E.."t��-i I - ��,"`;'�'t.,--F��.,- ,iI . ...1� 1"t ii!-�... .-.t-i
�.N 11 ;:;�i�t.-, �'
. ,. , �711.,-.- w�,, .
, MIR lrro:� ," , --
�,-��;I -`�Z���r ��,� t,""', .'�*,'� :z�ij v:-Nt!1;i!1 it �, .�`.,`,��MT�o,�,,i N �!i�!;�!,�"����iii!"����',",",.', - ��,' �.-1 i;�w u--f-i i. 4z;z,: --.
-- `101;'Alli�`�ii) � I Z.- I i-t;I . z!, �i --�r--.�--I i
I ,I ':��!n�,��E�-�--.,�,�-:�,--��',���i.';,,�,�!�,�,',��.!�j���;�:����,;',�ij�;!;�i;$�i��;,;i: : I ��;�............
t�, ,111 11 �.t �i�,,w,� :,,--.... ..,., - . _,,,, ,���',,,.'���!.�����������---.���:�����:�i-,�����^�� ^-z-.i:t�7?t�.',,.Y,1,',' .��-,�,,:':1,-_.-..-7:��---i------�-- -
- ,,
��"-,J� .I.."I;-�,,� - � 1.�� � A " �:!",��.,� ==t.
� itm,ft�tz�i��-.".-..-,,:�:i�:�ii;�t" �,-- , `4'.,'� 1. i'T ---5�,-ff ��ttl" ,. ,- �-.:,__---t
- ,. - f441",, * ,- � ;,z���:;f�;��,'�-,;'j��,�.-�-,'�,!��l:�,,;�,7�*,�,�,:.� "Ll I
'Z '�;" -,-:��, . . I t,,;,,,,- ", �'-,`--
-- -���-O`i-- , ,, - I . - ,
- -��---",- � - - ---��',.'7 ,--":;�t - ,_ , 1--11-�-.-� . , i�� tl�:--:-,--;�-
t-Tl�kt` . �--�--Z -1���:
,�i,,R�i�`�M,r5,,'-����tfij',�m:.'.".,�,;,,,-,I;;,-i�T� ---�,- -'-,R---,t--�,Z,7�,�---..,��,"'i"'.";,Q;; ,��,'1% �p
,
--
�:
,- , , , .;- -it .-_,". 1��. I " - ,J7
,�..'-�;i��i�-,_�;7��;--���-�'�,� , ,":�07-,---,.4,i -; - t.,��-��
li�'.,,%�� -.----,. ,7.� ���
I lt�, .- :-- �-!.,,_--�,,,��,- . ��----`t�
- . : ..
-, -i��--.4P, ,,',,.,-�:��.'�._-,-�,����.�'�.--,�'-�,-,;--Ii,�,,�-,,�,�--.'-,*��2'��i `K�--Z-N`t��:�'. - "I I...--�.-I-���-.",..�..�"..'�.:,��"I :� --�t�� � , 11
, ,�� , .�4 - 1. I 11 -_--t,1-1.c.7---
",,--f i I - . -A, . 41 ---!-------L7.1 --;,
�
-1-.1, :,�
��� 41 ,,4. ;"it &�ii`iu:"�-,%,,'�,, ---n`zt�---�-�;-' � � .:,
.- :%;� , �.�--�. I-, , -
. , S i -*,^�---t-,H�,,...�.:.. ....- I . � 1,Li-i''-�'���-�it"-�
" .. , , - ta -zl-I,
. �. , ,.
. �. , ,. ,
"
..- , . �: - �a
�-`-r�� A --
""' ,�gii,---- %t, �=-f,.; - ..--��:i-��- .-
"--�=z��- -- ` i�ir�f��-*�- Z� � -
-- �,t-- ,-q�,.-.,��L�.t�,-...,.,�,,i�.ii:��"-?�,'E,'�"",(,;,��e,�;;. zt�-`��J,�-��!��L,-; -il� �-t:1r; -;,�-s '. -- - -1- --j�-20."',, it,-
...,�-',�� ,.�,`,�,��jgi"i� ��. -P ,!',X't�-1'm.,�---,�-=z ,--�3it�'� .- ,
.--" - � -�
- - , - ,iti,� ti,,�t--- -,.'�- �-
.",:.-�:t�-,,.'�i- 1c.."- ---- --
�U.,EJ:ii- -��,:i� ,�tl,i, i`,`� ...--
, � _�
lfi`,�::�,-�!�-',:i�i�,�,�i,P�-.,- I--.---,-- ,�t-, -t�`- -,i,-,it!z - �,, I......
� . `,
��El,.-'.�s�--D:,E,tJj'��:j�:!��:,,,�,�,��--- '-i;::11`i1=i:1T-: �q, :i-- -�";�,�,li,��` �.,t --�:i_-i -%-�I.zq��,-,.�:�:-:-7,- -� '.�--. -.- ..... 'i ..Z�
., ,
- , �. it,!,�,��',- T , ii,�,,-,--tten��-i-tii�----
- i�,L-"',�I`�,,',,'-:-,�'.
. ...... -1.11- I- -it� �, "
"", , . k 1�".,I�,i� ,-.�-�:7;, �;', . - ... I....I-
� ,�itii--tt��-_IiaZ :,-
. , �.. � it- ti� __:- ...ti. . I
- ,,j,--j-::�F'..jj1��,-,t--- , �,,�,! �::Iz�--.1-1-1-1--l'..
��,��'I!,��-�����--,,,.�'.�-";"",,-�--,'-.���t.,-� t, tt-t:i,t-,�--.-,i.;.�;� M � .�, ��.,,�ilii�,l .%': "�,--��_--,-,;�,-r--: I I�
,%,;�i,-,�ti,�j " ���- .---ii�i -.. 6 .-
�i, �'�;?..�! -Z%-Zw---,�---t=-- : � I 1�.�ti�,-,:
- � . --
'�, " - -i'�� ,, i, �:
- - ��,�!,�,�.�::"!��,t�`�i�� ��F�� :
�ff�i�itL�t�,'::�,,-,�,,i�-:t-i,t�,!�;�. . .I ---,TW:4- -��:, -,,-,'.�,,�.,,'�...�-�,,�����?,.�� .
.. - --- -1-�fit iz-",.! .,� .. " J-
,�, O�i�'.��t:�*��F�,�,�;"��t;�.;-;-:;,:-���,-��.,;.it;i;�;��i - ,�,�-1:�:�.����..-.�:;!�,.;:���-�.-�lI . I I I'll
..":.4��,.�.";it;i;�,:
,;it;i;���: I
,;it;i;���: i �� -.-�
,;it;i;���:,
,;it;i;���:, ,
,;it;i;���:,
,;it;i;���:, .1
,;it;i;�;�'N i�: i,��;�;!Ji`!;1:;1e111'1tIitttjr'!11-,,--'�,%�,!;,
'I'�'�l',�;��I'l.�-.��.-.'�t.,�:-,,;z-;,';�.;�-�;�i',,-!!-'.�',, .��,�.��,,�.��,�!I�, ..".", ....
I I ,��,�.:�;�-,;;,�.,-i��!??�i,;���;�1,7-�,�",�i�,t��,�,,,.,� �!l���,�,,",,,,!!!,,,�',�,�-..i�l;"-�'�-.�,,�,-,��,�,',,'��.,'�'����!��f -i�:-t--�.�--- . -%I'll ...
...�I...- , ..-11----- ..tll,
- , 1.',�",�1- � ---.1-- -.-I--1.1 I....�
,����',��E�,,.E,'���"7�,��Z.�.:�,:�i�i!!;I�,�-:-,�"i:% ---:."-:::i.-.-.:
.1�.........I'll...1.11 .4�, -- ,�
�,
-1'j l,'�,i,,��ii�:���l�i�,;�:;.,",,'�,�,',,:�"7;�:7;.Iii",��-.�j�i������!i����l,,'j����!i��i��;��:�f���'��.!�-�---. -,-.- "....... 1,"' .,;- ,:, ,-
�j5.n..%..,�l;t��,���l.,,,,,...,- 1.-- 'I'�ill�i�:;�:,.���!��,�',,.';����:��;�":�f�;�;i��.� -, 1111-1.1..... 1.1111, �;�,,-
, �.
, ,-zt�,
':-zt�,:
-- ,�i;��i.;�"�:j�'t �,.",!,., lzi�-:fti--,
,.... jj,�;!;�ilj��It-t :-Z-t- , �, __ "-,�1�.��,*t,t,��,��i�,�,,,�; -!�i��
-.� �%.,'�'t�,", .. �111.I...t;.�, ,�-�,, .-, -� , - -....
. ,�;A -:���!���,---:-,,�f�,-'-- , "'�,'�.�i""�.,��,,';����;�,����'�ii���,,,� 1� ��iit.,
�i�Hjz I i, r!��)��,�i,�ijli�i���-,��!����,�i"",�!���f�i� ,- .,�'�,���`,-�w.�,� i-;',��,'���,�%ici�iii�i�- ��!��- ��l�l��;;ii;�Fz�-.,-�-,'�,�,�-,��l����i,Z�,��i,�!.,i���,-.-,-�-7---,-��-.�----'t�4�-z���:t
"I'�'l.;,����*,�!:����,�,��,,,��l�,�".;,."�,F��,�-,,�,.,.;(�l�,;,�)�i�;���):�li:�,��i;:�.i;it.�,,,��,�����,�������,������,'����t,:"�,,,,-,,-',�,,ii,-'i�,',,,��,,a,114�il'.11%11 - f, I 'Yi�ii:��!�!:�;I'i-�� 7t,tn�"i�;;,�: -,--_,t;;.��.---....-
, - ,� - .. - - ---.----.1-.
Z'ei;4;;��Ii-lTi�;!;i,,!-,,�', - -i�ii��,�t .--,�,,�-:...���i;t I ,n� -.--,;;-,I.............;2�`,,'3i -`�:!`�,i��!-,�-'.r.�,:�-��-- '-�,-�--�--
---�j�"-'�,-�],��f�t�1,1�i�,��-'*,,��, -1�1�-,, .,t,.�--,,i�i�,,�i�--!r--�.:�i��"Z't;"" . � ,��.i.,Ifl!i!!!�i'��]',t��',�.-�,,��;*�i�.-.����-.�,-'��.z:�,--�:::��;;�!�ii����;:::;Z,iii,t�;:;�3'1!��,i�!Z�� i e,i�,:'i:��!t!�!
,- ---.- .L,tw, .1,11 -.1, �,� - � �,I:� �tIi,t�i,�,iT-
,�-�".'4,�. -, . i!!, ��"', "..- -
, , . ,i� �. f�gr��
- ... - �tt�!R "'i""', ---;---,,j ---�.I..11, i,';,,�i., -�-t!!; �Iiiit�-,_
.�.;�iP,._ �j.z ,,igl ,,,__.........
, , , , ,!��.i, I-�, -�i, ,, -e'n�,Z ��� . .t*p ,��JJ,ii;�,� ..,,�,
.11--.1...,�,�,,:�i���; �i�,��', - - -----
- - I - ` D- - �,zt.;!t-.
,,,: ., I -',., . ,
" - :7 , �A. ;� ��'t -'�,'-.��itj,��jj�, ,-��-,,,, ?�,�-,R.-,,.iti�r�;�!!;!'?,�','-��i,i,--ii� �_:-=
' -,,:��t.".-.....,- �. - - , ,,.��,,�"".,�,,,,�,',���i�,.,,I,-_�,.,��, '�-�� --, =;e
,��i�.t -,," � -- .r �, - -.-.,,.'��4��
- - -,--,n",,�,�`,-"�m�,g�i .1%, `0 -- -- �i--�',,�;-�,--i�-��-�i���j!��,-. ,�.�,;����.,�,,������,,,�."":�,:���:���"-.i,- . --
-:t--.�,!,T,-�,�`.-�-z-, - - -6, , -
,
�i�-7-'j-,"ti`-�,�::���;:-�� , - ,, - i"', - , � , * ,t
�; ;i , � - , - - tiu` 'Ifo-'�Iii
-,.A:�i:;'�-�� . , , ,�,-,.'z F, FiDi A
,,
,;�-,��.,,�,!,.����:'.�����!���,'����,:7:����:,�.,z -t�i��-�,,,i"?*,�;;��-,,,��;S,ff�,*� �b ,`�,;'J,- -1�1,-, Z, -� ----.:,-� .",�;U,�-�-,-�,,"�',�'i*�,.;.-�.7--'�`!-Z-tiii...
�
- - , -,
.......-� -�!�Z� .�-,�,m�,��L,!v -,,� .*R-�-11-14�-.lit".�� �
,� ,�t', -,� �,ii�'�'I��,,�,'.��'�-�l����,�,.,.����,���.",i���--,-",���-,�l��,,,,��,?I���,i-,�,,,�;�-,;-,-"Z.�,.-;.,-�-.� .� ,�- -, --
�..�--�--,,�:�--if��.i--,�1�:,�----I'11- 1-111.1----,�'t'�'�L!�l�,�,,,�,-,-,7,*"-,a��!�-�,','�","',��,�',"�*l�-"', "'-, ,. li�S�,���t,,t.�.� I --
�. --ill';-:�- -. , ,.,�-�t-�_:�='i-tFt i,�-�,:�-����i--�,, -;:-",-*,",..-"--,t;,;���,�::.-",,, -;!�,�
� - 1�,,;�,.��j��!: ti�'i�i,,'.,'!�:�,�, - ----,-., -��'-,'��,"-�',��-.'���'�-�-.�i�,�',��l�i�!�':-',',, ,_ �
,-.,-��,,�:,���--,�;-:-n-,' . PT,tit , -1-,-iti----,z ;!:i�!,'�,�,-'. --........... -i�;iv-�- '--'-,'� �-., n,ti-,=.
�.::���t:�,�.:,���:�,�:.����;;,,,;z�i.z., t11z.. ll.;�,�ll-Ili-�.r,��,�,:�����-.��"-��"�!�ij-,,"�'� - .... -.1-1-1-
- , - !�i'��'�"!,;"Ii,�*��.-',,!�i--,',,1-:L,!-. p"iitt;;iIA '��,,-]�i,��i�';��'t ,�,��,���,,��,��.��;�-�":.�,---�'�-,�-,-.'�:��l::.�-�:�1-1
, -I 11-1--11- �i:�,,----t',�,"�;'�,,*;;�,,�:�it',,,,% "'.:,�ti"1 �-----'tt�--,� i�i�=,-�
1,j��Lttll�::�Ii,�Z-",'` Zil"����ll;���,-.,�ii-�,,�,-"-,i,�i'��li;!�,,�,�-it,,,,��i",�.',��!�',,:�!i!f���,-i::�i��:�,,;';�,-_,,�!!';,�.����,--,-�-.���.� -_,;�:g;=* �,_-.:: -
, , � lt:g,L-,,�t�I, -.�:5-',��f 1-;��� `1[!V,�
!�,z-�%�--:--,-,��,I,t�t ,,4:,zi-t �;�� �i, �,'I' �-' - 1'��,,,'jj;ji'Ctiiit;�Z' , - ,:-, i�,- --�--
- ,:Ip;;,�z ,.'i"'j., It" I ---:4---,J-.--*�,,-,-'-;i,,�,'�."T
n, � it :..-',;;!----";.,��,-.,�i,��: " �. - - �
�.�ii,fr-.� �t��:`��, -,�;�t;y;,j,�Iili i , , �',�� --�'Zli, ��:� ,�: ��;;........... -1-�-..��!�S; t���::,iY
'34"' , - .I - -'- . ��Z�--- � 111m-
-',;--,,H-,�;,4J`�,1rr .,'i-���;��;.�,��h��"�;",i�:�f"���",'.�,"�. 1- I ,`.-!�,�j �' !-� .,�, .i x ,:;�, ,�: , :�, �i ,�t.ji! ---�;:,�t"".,i' - �� ---- !t
-,� . -wi... -.t�- ,j�,--�
,.�,,
� -��,�!.it�,���������,,���:�i"-.��",�--."--.,-���'�-�i�-�."F�'--�-_-��.-l'.�� ,
,::�!tl,:,-��,,�h�ftt ,� _ - � ,- .;t-"�
I I - �- , -'-- ---- , � - .-
, ,
,
.1, � �������'��',':�::'�'��".Z�,�--:�,��':�,!;������:il��,,r��,�7��,i�� ;-������,��,,�.:;-.i::--.-�.=,.-�.
I ::,!��iL i, �t;:��i - �I i!��, , �- P -�J----,1fi,-"---,T
5. , , ��,;,�-�-!,��, :;��.�','��,�;�::��'��:���;�.-�-��'�-*,Z� ili--�-`�i
,",
-��.;�-Y�i�� -"". -,��;.t,��i���!i��;:�4i',,,������illil��ii � 'N "��il,�i-i.'i�iiiiii�,�����,.�z..,, ', L"�,;��-_��":���-1,�-,���;.���:",�,!,
- . - - �,,,-i�lIiTlq�I -, - , ". �f�.t, - -.
-.���i����i���l!!�!;�,�!!,,�;4!",!;i�',*,!�i�����,�,,�'j town-1-1 � 'i-�`-d��-�,,�i��
�-'Zt!,;"�:�I:i�.�.Zz. . , - AMM-IP;i:it � , �:.�Iz , -
'" ,'r �j��j .1-1..111.1 1,�"i�i�il�j;�i�'��;,!,�,;";,���.�,l�z!,�;�' !� . - --4`i�;��...1!1, �,,��,.�,,.,��,���;�l�.-���'�-.,.,f,r� , �., . �`g
�
... ,
,- .
At' t"r" r I",", �,b
-, �
..'�i�!�i�,,:�����:�:,��,.'�,,��:t�;;� ir On
t,"-i�:c"N! ........ — ,,,,.,,,i,i7����,������'�",�q���,-�',ii-.,��-'��-,�,�',',!,,":�', ,
, .�;- , - �����i�--.�i���.-z�,,��ii",i��,��-it, li,i'-`.�,�, -...-1------
14�-�,.M 11--111 I - . ,
il.-�.,��-����,,���:,;���i�,.��,,�.�iti�i.��,i�!�",!!L"�ii, -.....- z'�l;i"..!",."i��i�.-"���ii�i�i� JI!!j � ii ,�:�i,��:�,:�z��:�,���::,���"-,:�-,?��-��---��-,---�-----:�-�-�.-
�i.iijj�-',tf!;-j,l��i;il�;!!-.;;rwl�;� i! ������i�j���!�;�,��!��""-i�!�,!,�I,,-!-------, ----�;--i:t-;-,t�;", 1111-1. .�:-,::���(:�;�!;,t..,-�.�-��--�------�,:,,f�::-:=nt�i,
t".- 111� 11 ` :,��t,�-��.,,,I,�,:.�z,;^�:���,,,,���'''Q 4--1'1,t�--
�, `�,'3 � 'g, j�:� ��Zit � ` ,--.� �
�;! ,;P � � , , -,-,-, -p----�-
--"t"i j��-�".�'. --!�-. .-=,
-M�.',��i�ir�X ,;� in��O-,�--�-- :
, - - � ,--�' .
-,�,,f M�,"'J;i�',-'z��-` ,,,a,.t-,gj�',� --,��i� , -,!;�,-�I� '.W�,%11&---J,��'": �11.� � �'�,'�' -"11 � �,,��� -."--,1--- �---::,-.
,
.,�, I�.4�---7�1"I ,� - - . , ,; ,� ,i� �-
- , - - � it-�--tt�.---
� � ,- , - , , - - , � -t�. -.
, - - - ,-,-,. - - I...�-.---
-- - .). � �
- w - �, �,-��;iO�T,-,�,; .--,,'.,'.-'-',.�.�,����*-',.,',, ...�. , �V'i,� , T: � .. -, 0, - ,;--�=--�'pt�-t-
-� -, � j":;J�n,�Mi�Z]; ,;��� - ,
il,�t�;,i--,�sH��'; M_-.P,i, , it - - .'.t 1-1. - , . I 1 ,
�ii, .,-i,,-, --�,� �t � ; .. , , , ,
i,�Iilti:�s�t t%� ,i�i �,,�--�,,��,��] �,,,;� .1 -�.�1�;-Z.,, I��f-�- ,� ,.�:�-,�,-.`.F-1111.1111��- "�*.�"
# L --, . t
- -�-::_q�T ,,i, Z�,,,��t ,i-.:4 FL!,RtW -.' �
; � ��i��, e".- -,��A,�
i�,,,����..,�."".-���,-,-,-.�--..,��,-,���,,;�;,��;l��F.Z,,r,IT i _,��-:-Z�,i,�,P%!,§���:,,,:;�;�i�i�:���:�j:-I��-."�"",�,',3��",.,�;���,",�*.�i�"",-,�-",i��.,..,.-�,�".,-��,�,r,4���"i'�,,�,_,���.,�,.�",�,�.,',,,,�i-�,���,,�,�\,�',,,,�,!�;,-�,i,-,,,,���,�,,�-�,�;�
,��,�i�z-^,11.,,'��'.;'�,r""":;,�.-"� ���-,'�����,,,-',,'������,".,.���-,���i�� --- , —�--It-.-.
-i�P,�', t�.1�, ,__ -trzw,��-i�t;t z?:�'�:;��,�.K;'� -..-;,t-:'-- ::, - '�:�Z,.:�-'t�`,'��:t -:�---ij--
:,�:�,���l.%,.;!.��.���,�,�;�"--'-',-- , ". -,�, ,� -111, 1-1-11-.,...� ,.". �,-'- '. -tet...7:�--�
- . ,-"I ,� x-t :�!-,"���-�-"�'-�g',�,�,��!i���'.'ii .� -
�.��,, ,�,..7-.���-gi-���-4�'-����r-"���, , �t!, -� 11 \ ,,,�-
,:�� ,*,i;j-,, . , - ,� ', �.I-�----
,�� , 1, �,-�,�-,7��-;'�7-��;���-�-,,�!.,;i!ii���,,��!�,��.�,.,�� t��;t�;��.�,�� � .��,i�".',.�;K�l""��.���,,��z";�-��,�i, 1- -t--
- , ... -, -,��t, , -'��'k'i'. 1,
��-",���i:",��:;�*�'��,:�::-,�":�-,��q,-�--�*;"-, �c�'r,'�,-,�li�-�41":z.�,,,�"�',,�,�,:�, , , I , -
- � � q�tttc�'.��!�, ,-,--'-',',-'��-�,i�,,���.,',',i����i�.,,,'� ,-f,nt, ,M, ---Zti7�-
.F;. -,,i��",�-41��i-�,,,,--.,,����.,:�, ,1 `- �--�, j!
- , . , ,- - , - ,:�,�--tit-,-,,,,��,�-,-, --�t�i��,,�iz�ii�,��-,��)� -------1--
%i� --E- :i��',.�;,��i,-�E--!-jj�ifj��',,',§,, --j"4�,:1,,;zj�,- 6�d,",--vi-�i,;trnii���t,'�:i��;��i-%t-.:,.�-�:�,'.���;�- I.
- ,ij flit T I - -�v��-�it z, ,,,'�:':1��i;i;i;,-,,�i��,ttt,,,j,��'�t,'-ti��.`�',;4, , -=,1-1.`--.
, ����;��i���%,��.�fl��;,�)�i,!;:� :�-i- ,-� .
"I lhi,-�,;I;-,'�,,m J, i-, fti�F ,;,�i-,Ijc�z , :;���;�;,i����;��-!";�.�:!:,;�,,,'�,-
, ,,�� ,Q��t i� - ��:��:, I
�-,-'t.,�:t-,"'I'lz -.'C:::*�-'.�_; .� ��tt��,5, -,,'- �=:-..;:t�!-',
. -, ,il � c ,� - !��---`��,�,.`,P;�P
.. 'N", tt.;wi - < -
,- t .-I'M up, , ;"�iii;�i����i�:ii�"""i������i�;!Z";!,i�,,��!�;.���,� �-i�,,�,�;--'i-,�K�-�,��,I�
.�- - - "--..-.---..-
`��,Z:,,i� ��-� ,0� I �i�;-iiii--,tf,tp . �,���,*,.�,',.',.�,�.""",�-,i���.""",�"i�,��,�-! -.--,,,,�,-��,-fl-*,;�i��':it
,.;��I, -- -�i-"��,,T'�J�,Ii':*! P 1;,-.I 1, 'i�i��-!�fj!j!�!�N�j 11!1� �,�Eti�;Zit :',��,�,::�,�:;j:;�i,��:::��;:��nit:�
'-� * - - �,"" , 1:ili,��i , .I",��I..... , �, .......6 -111 p I-,,
`-:Z.,-�"4,i,�,-, ., R! zl:!Ctz�t-,-::tz��'�;, ...... �it 1.6 - 11 t; t,..��i�.::!;,,i,,'�ii;)��!l��iii��',"',��l?��i;i�i:�'��cN`�j, ,, -
- ,:i, . , .A- I I .:,�.x t�I p�;;;;;;;.--�t t,�;.it��I L ,I........1 �,O
,F,t::�,�l��-,.,,z,�i���",��i��-,�,;'��"".,Ii*."t 11.....11 I " I ii.i;.��:;t,:�)t i ���,� T.k.,NX 401� ,tDtM--,;t,,i,;t,:�-;t�.�:�, �:i�t,i��-,.:Z.-t;�.�:;t--t�::-� �;,�i::!-:
-"it, - ,, t;.t�,,t; -11,
�-4�--'.��.-�,'��:����"-"����.--!','�-,'��'.�i�j�`,��!'�i�T`A ,I i',!,'����;�����i�ii���i�,ii�l��,-,�i'�l�"I� Q0 , Inj�"_m..1,111"'.4"i-11--t-,ii,
��,�����'.Ii!il�ll;ili!�!;������ -tl��,,51�1:116i,,;Ili� ,--1-1 I -p -I mlt�,;i:t�titz;�-:.
�ir:;-mlt�,;i:t�titzr�.-:. t�`it:.,O����
�. ",t�tMz,It'j�lt` ,-j 1,-- "'I't", -� �,�,.;!",��,�i�:�������;���l�;�i��:�:��i
it- B PH, U AITZI .1-111- -
, ,i�,,',At:,-,!11'j%jA15, I,1 tW�� �,,'!"Qjl, ""'"�.��'ll1l.11.1',��.,�;iz,���!�ii��i�-!�j�,�,'��!�,�,-
, , �;11 R194180 0�1�1�--- �,i"'liq,11 I'll,�-1 �t,��,,
, 11 1,i! � �`"'- . ��,�.,,�,-�i-.-.�rr.�t�1.-�: , i;:tt
�-
"' --,-:- -, . - . -- . I -1-
�-,,-,���i�l��:�i"��,�;!����!i��;,;�;l�-,.,, t "I J, ,,;:,- I- I �
�t�.,-,�::�::;:.;tlzk:�t 11 -.
-, lftit,!��,--, --TEGMU � , mewfe"U�ne�-,:(Je-vetp --O Wbf loofi§tArj --��:�:---�,��:i�;��:i�i������!i ��,;
, '-11,;p,--�--��:p4i��;�Iij,ij',, "t , - I .d". .�-�i��:t:I -
.itz,� t.�;;-Iiill� Ali;Etl I K� 5w - pm n,-� � , � .I�I I-I I
-_-�-�� ,,'1111o,�-�11, , 'i 'i ---.1.11-- --
�-�-;�:-'% i�:".i� ,, 2,,,��:�:����i.�'t;,!!.-,�.�,-,���"k;�-"�ilI ;,�t',���i�i;i,i� 1��t',�.�:
.1 -�,,�,�,t-nM�I�i , � ,-,�,,,--,-�-,:,-.1�����-,,,�l:�,����;!�i��l������"lt,;,",.,-,��,i!-�;i,�"',:i;�*,i,,�.� ,�� ��::,,""�' -t'
- - --I�Ie,.,-tl�.;9i,�. !,�O�AiRz :z�,14,::�-:';�].:� - ,---- -
. .;,... ...ti � i- ., �", i-
,� --;��,�.,�,t:r, -,�Vl -�,--�--.��-�- -=----mi- "i - �� -, .,--, , ,�-1
�---;,t��,,;,.,t - . , ,�`;�:-,i-�:�ii�i;��! - , .t��,�,-��
-;',,-,1s .`-t,lz�!�ii; .1 ..", -i?"'T�,��,Y�11&'. - --gm- gi�, i -- '- - -, - :TN" -,�i�.I:-__, , ,� --.1-1 I--�t�. �,�_-:
R��, �-- !Iz ,�
- --I�, -
. 4�;,, �...."111 .,
, r4��B -,- ��",- - � . ii,�� IV, .
.��', ,T 1�i. 1-11-----, �p,ti--�,��,,-.���-����--�'��-_-������,q�1,1�-.�",��",�-,,;�,,.��'���",I�-",�il',,,,���.,'�L,�'�,!:�
i,�.g�i i:i:�n;�'.�,'�'�...".,41 - � ,���� ,;"..-0 1-M I 'It , �:.-.��,;:�
,��;t--,-z� -,*'t,,�; .1.-1-11�t, , .1. , t......... ,
-�',`R!;3-�,�,,, !�A- , , , , 1-zzz tyc ,.ra�- p�� � `--'-'i""i�;-' , I :: .
-
L,jq�j , "� �Ad jq--, t- p .1 ,,.,h ��;� -
, I , " "6h--'" fir ,st 1�� H u It i- '� �
�t;��--i r-,i;��,,,,,, , .,i I -'."
!j��-,`- ,-- ; N
;,�_,�t��`,'Z......� 7t
nt:�'-i�'�,I-Ii,,7",!;,'��
, Z lut.� .�, ,, I I -:-�-. t'z't
- -- I C�_p -q�pi . .tfz,,,q , .. . , I I
"-- ....... �� " ," � -,H-- i;,�i"!�?",it��iA�i�,,�%j�,��2'���FF,ft--.i',':i-N'."�'�'�,:Z"t,.�:�'!�:�;�il 1�'�!,�:,�i:! 1 �;�, , : "�
, ,_Q 4 I�trl��W . ��; ,'��'�
.. I � ti.�i!�-j , ". . . _ _q,_ fid 1� 1,I .,
'-.,, -" ;!���.I r��:tli",j r-.,.,.,�R ",��;��"!�l�z���.�,,.I����ji,.�,�t-�;",��'�;.,�-�'�,-it.,,.'�,"��'�."*�-�,,��-',,-,,� j" --�-F.,,�-! ��. : �.- -`.��t�-�t�.,
-�----,---J�i;;,�--,q,l,,'A. ;1�� ixjN`!�::1-::j , ,--T"-' �ii7---:, -.� I
. ,
- , � , _- L '--,,�_� .1.-...-1 ,� .
��t��'-,iim�,,.�,, Ili "' , -- -- �, .1.�,,�.I..",..","�,�t�i����i;,�i;i��i-.�"",i��;z ---,,,--,-- �
"i
-��:�j-;!�-11�,;,�i- "'! 1�I ii., -11i� ---.�,,:,��,:��Mit:----,,,�-i -.11111 --- t- wt: I z:i-.1-.
, , "" '��'������i��-I'��'I'�i���i�i�iii��ii�',",'�.,�',i!,'�,!;���l��,!-�,�,�-1,��l".��z��,�, ---�-�,,�v�;!�`,j;!!,
I , i�,: , T�;;?i
, -, .-Nt,1�� ...�,ilo�lt,,�iiV� .-'ii�;, , 'a,,�ti��q��,,�,,,�' "' -t-,-�,�-,.-i�it,,�it-, ��:t�,-:
,J117
, ,,, - -�'� �,�Jir _- .";-
�6 01 --..... 11 ,1.�Ift--1---I I I -I--11-� --
I I'll -1 . -7
- .
��,111;. 1�
-�:��;��,��.�����.""�"z!��z��,,t-,','.* �',���. �)!�,i�,.,,�.i��,�!J� ,11 lq,��;,t;:; -
. "1, ,� ;1; - zD -q , .=,tl:;�
.;,; -ff:�J a, , :::::t!=t
.1;1,1-11'.
.
.;',.';i,,!.
-"� I g ,,�;tlt:i;,!��f�,'o!�. .;-.i,!., -,""'---"""',,-"",- --- - .
, .,;I` �1�,
.
--,!,.,'�l��,,�'��.�����.,',,I�,.,��,,�.�z L'm - ", ,;t, ff, I". . � - . � '.
� , !i:��i;ii),�-"����-','I'���-����������i-,�.,'-'���, ,;.',i��!�
,i i�);�E.��",���-L����::�T�i,,�','�,�,,to .
�-�-�---q.;Z�j,izt.t.�i -j� ��f�!,if�l!---.......,!i�'j�!;iih�.,R- -1-1.ikit,� �.......�...r .p- .16
i!i�l , gpe.mon pring.;sys i f. .........i",
, Ml; !T�i,ii��,�� , ., , . .-��_:--
, - , �jli�t���;�ii,ii��������'.,�,,"!'.���:��i, . � -,,��!�l�i,-��-:"�;�l'..��-��,%�,��i�,,,,.����ii���i�!: ` :t=tii:
;t..�-!t�'
-- :I--,�, �i
- - I� �.I; ---
"!",."i���,'�;.��!.,�'-"!��'i-..��i.��i,-",��.; .1i ,*-Pt;:� V" , ,.t,� ,-� , -��.�', j�li�;i�i��,'� ��-�---.'�!L-,t,--i��-�,,��'�:�,-'.3���!�i����z�ii��������� '-';-�i' ��it fl� 1-�ii-
, -. IP-1.1t. . . �'. ----:-(,�....4, - , .1�--11 1-1-....3tq
- .iP f .1 � , - 441M�; - :��;i��t�zz��e��. -'!,���".�%,,�� - �
, ,, ,i2, ,ii��.����"""�ii�,',������:���:;�,,�I:%,I*,,'.!�i� :," ,.:(;!,��-J, ,
,, - .., - - zil�;�'"' � .11�- � , - ;,�;��������i��i���,t�j,.,��������j�:��i�i�������%;��,'j��i;,;�;%'.,;i i�i�j-��ttl,-;,i t�.:",1,ii,�;, _"; - -,�
-. .�"I I I,;-.`�;!,�t,�t;l
�,�-ml I t.� L -,-,_�iqo,Nii:-4-��-0--- ��;'ill �J, ,
,i'.�z��', 't,V �,--
,;.,��::,(;lt�� ,
, I�1- I ,,�.I,-",1,�,�,
i - � it.-��,�ti,�,
, --,-.�i `--
"t � , p! �.� -,... I .i; 17- v�,-,�--��-Q-,Z,i'�`.-',�.Z^ -
�
, *�� - , -:W�,f,�, - ., - .... ci or - n' i�gt' t, , ,t--,-,t F,,i,�-,:-,�,,�i.--.,
:i:'��i��,`--:t�17",--'--'--,-it:?,--,-;,- -, .� -�fN!15 " 1:44 9 R"" 'i ,*,ters:�an
1t1--'11..,.;-.---Iff�-:-: ,-
, IN -0vRK`fOM',O ,,P.M. q I 6 .11"..-
-,�'-�!�-!tp'-j�'�,,",-%j'�' " , :::Z�-
:-�",�l',.'�,,��,.--,'�'-"".�"�,'."--�,.'77-�l,-",XOIM4�1,�'7 - I:f. 1 ,P��'2�1�:��-i,i ,,��,,,::t-i'.� 7 -I
tt il I I �ifii,,��i;��-1"��;���-,��,--�'-�-�-,�,,��,�---�,��,--���;-k...�...:'t-,.I;i��,�.:�:i!".�l����-'.'�,i',".��,.,"',�.',�'�",�,,'-,.�"--.',���-,��-,r.,-,:z-!,,�Z:���:;z,:;,-,,�."��'2�,�:��:�l.,,i!i��l,'�,��i'� 'I.,..�'",,';�.,,�,,�T",..;;-�,�.!,�,'�,izik-',-,�', , �' :�,tz�--�
,, - -- � -tt-.tlll-�,�:-.,i�,ii�-�
---, ��,,��,i:�,t,.,,�.�;1. � -1�,'--.,����-�,I'�� :.1
- - - ,
. �- ,� - - -��'��zt�-.;i,;t '-'�".�:1111zi- -1,,,--Iz-%-�111 .�
.. ....�ii, .�-"�,-,--,�,�,.-��-7��."",r"�,,���,',�,!..-.";�i;�i�i�i-,'I�:�;.;i it;:;��,�:-. ".- - --�.,-�,;:t;i-�;-,;,�il,t�,'��i�p�"!�:.�l���,�.,]�i����,��,,�.'�, - , :--9:
- -- ":, ,� -.�5�, �W�,�,i:�,�,5,tic- --�-,�,!���,i���,���'�,:,�:��;��.-i�'�
---------""� � �� .I � .-.--..,
,��i�:��-.�,.�i , - - � I -;,.X1
-�t�:`�,Fii - . P � �- -�,'
,- ,�
--- . ,
- ,:-��-,�.,Y'-Q-,-t�-- : - �;;
I I
, -,,q,- L �-.,i',-��L,!�ii,c��i�,;,j� ,;�- i i�j 11---Z;t,�,Z,, �i;�,�! �_,-�
-t-.�-:,-.Z.,� , �--":,n-fl;,ei �; , !"- -,
," -�..��,,�-.-�".:,.-.�.,--�-'.,��:��'��'.--�-����l,�-_,_",.,-,,�llel��I. i-:,�Zwll 1fi-:1tii1.i--,,`-Ic-! , ;t�-�, ��.��'..,tt,,`.�t-i!�,ZiL ,-,,"
,.,�_;��- - I - ;,a-�E�. !;!:;-�wl, t,�i�4��,-,i�;'N,;�,�,
-- -�iiz;�-:z��-� .-t,,i e�i V 0.ri t ;:' -t' ���, �4 i-'p;:
S f er.9,11" " -- - -
- �!i;;�-;��j��t`,.-�` - _--j�............i".'j:--, -........-_---- �,I x-b-h--I'`;� ' , -:, ", 1-=��:r
.
-
���R t---,�,;i'!t.,',,;j � tw, I 0 riigiq��d'jd-jti , -"71 i Z!tit�i, "t,� �-.--�,,,�
- 1-1 i�tt:-t�
!..-�,�'n"����.�,'-',,',i���,,���,�-_;�i,,"����������,., ,."�l,"f"�'!-!�'-�,-.."--L"-�i��� On,--�ej I It I 1�I I I ,4;fiii,i��';:,,i3ii;��,,;;��..�,���;.,-,,,,�.'.1i,, --,i�t - - -:-t� �,!1Z �i
P
, - --;�,�Z�, 11�l i , �,;�.!'-t�i t.-i�'�,'�2. .,�:�',1��tt '.�,�:�-�A
- - , , "!, -t,',,��iiiii!�, �� 'i'.�j I"I-11 I --
, j ....................- I;I�1.1�1� , ::::::::,. I
���,---,��i,'�,,:�i�'.'�,,���lt�,',,,,�,���.".Z,.'�-�';�:'-;'�; �t;j:I ,��.�!��z;�"!5il, t* -��;�l��l�l.�L4��!',��!.�';,,�'!,"�'.��'�,.,...',�U. ,;.%,.;��, -i.,i��, �-, -
- - , W.�i��!�,f��!i�ljl�,7'-',�J!�l '14;-,�;;t:,tji;:;t;"t'siz" ��jv%i;%�i,.--.--.1--.11.,.,jj� , ,,--,,, -
---- iij�[,'tw,4'.tt��,-:!��t�t'z�'�i.',,�,��.,����i�-��-,��--�,�:'!,:1�;1:;�j:::z7i:-,t... !I'
- " -- =--) 1',",!�,,J,l !�%- 116 �
I I I � - - `ti,!�,�i�i�;�;�,�����i����;,;*�;i��:�,11�,:�i,', 1111111"Ift!j!jiji!�jj!i,.I`i,:!!,:liljiii Itt 1`�Ii - -���i:�i��.��,��������,����,��-.,--" i�'.,�,,��,,i�I
,Iltt�;..... 11--11-,�z1i;--::::i:.
I - "!jil'i 1,t.j"Ij,Ill 11,il -- -:i�iT i,
--t�t,�`.-,�a�,*-��� -i!�-J,!� �11(�j!j�,;! ft,I'll-- L ,,---,�- � , � ,
� --N-',-��p',;�,--W----� - '!�.'������5:�i�!:zl�l����:�[���,i��t!l����!!�.,,.,,-,_--.1-1. 1"'� ,� ,�.;t�. - -1- �,
�- .- -, " I .
, -
��,-�:-- .--7,��, I I I
1 $'h,,";�, S, ��t��i;�i��lt:::�:
4 " m:N 1-;-,,;.,t- Ah , , - ti :it :::�1?'O'
--�"-"�:��4:�.��:'���z"-,����-�.,-��z., - - h...� -:t�- !hAV.Ot�6�-MQ R"Opp '00,"!"tt", 11-1 - tt?
., esei ,ys.ems'. ,� ,�11- �i" � ",�-',; -,MWe"': --:�:
.. 11.1;-j�.,- ---- �.. ,� ,;�,-�,:� I.:
- , ,�:;�:!:
-- � , Z.,-i�t ii��t I� ;�
-. ;-�, -- I �:z ��z;z��,�,�4--�il��������i�4�-"�i�;�i��fi,iii)��,.� ,-��',' iiljt---� -- v ,-:�, - , 1. ..i.
.
-,I 1i;11 ...,- , 0 , -�. - Inr ,('e.�,-i�,�.'t��,���-.'-;,���i,,,-�'�,�i-','�",�.ze �t&.:., lt:�t- .:,;��,l
�'�;:,,;',.7,�,�", , - , , -. ,�,-!, �i�21i�i��i�i�;�l,f,',4,ilii.�.�,"���,,'!�tl5 i 01, 14!!,7-- �`-`:`� , ,��,'
��.,�"�!er��.',��,��i ,j iM ,�Q��W-'-��;��, " . , , , �"
,��'. - -:
�;Zn� ,� k�[I �
--..-. . - "'L - -,",,I"-g ,t�31 M--- - i--.,� -::�-, ,� -.-t=�t�:i�� -
- - --�"`;��- - ,�,'N�t"g,�FH`T" -�L--,`i��*I,�:I''- '-,i��!��ji�, ,II,-,NE-:'-,i-,-7- --, ��.tl.�--`-�ttt-tz--�* -11.11 ... 1�.��;tx�l,:
��;.,�,41 t;t��1, Tt- , ,- , � � .�,
. ,-�� `11* ---� I'.1"Vilil"', -'f���,;r�,��i!��i'��,'�"',-�,.�:',,,-,, '-it:�t,�:�11 �-- - 1.'�, :Ti-
"-,- ;----,��-. 7 ��.!-.. 4-�
- - - �....i it - - A 11 U, 6. ". - ,, -,I 1- 'd,i-Iff -".t V, . . -I " '� ZL�Z-t-
, ,,-,-,I- - --R,:I,�"!T ----t,ji, ,, -�,,,,�,,;,'�,,,,���""�.�,-,,��.-�.." �,� -,,.-.� ,-? A,
, ,�:�,�'!��.c%,-*to N -",�",-�.1t,
I,- �Tr-,�g,,ti-1.'---,�;.-,��'�-�'j.���,--�;�-�'�.�,",,-!��,�-.i,, ,,,�!-,----, �
-, � i',�7 _ i ---,
�F� �.�-- Im,'A.'I ,�-- --� - ",i,- - .,--,
-r, -A 4",-,g�,R11 , m,fl ,--�wjofuif �g-.,-p- Ott,", I , �
-.-� Tb�:,�10,1,-,�--, - -
, �,,,t�,��Rm 4 jv, .� , t t�t=
,� � � tZ--,1,-i-0�.;t ";�i- 3, , - 0--i-,- --, . -,��----_ �:,`.�--- -��,�,�'.-,!.',t',�--,
� : , `;�� ,�'F,�!,-,, - � - -- .1.
�-i,�I,!,-',�-�it� , PC - P.O.�Wja,:Tm altoflnpqd,-`� ",�' :-tt��-,Z;
11--l.--l-
� . �,-::�,, -!-y-- ---� -�'.--_.,,L,,; - - , ;:4tt,f��
g `���i-:��t-,��q-�i,,;,� --�:i----., -- tz��t--V -� - '�,iiii-��--�.-iiiii��'--,-.'��' -�,.i�.,-"-,i-,!�'--"��",�,i":f,���-t,��� -,;�:t-;
,�__ _j.,
�__ _j.
_
.�J1.�-L�'i Z,.i. ,z���,��"i,,I�'!,;-,,��>."�,"',-,�.-.�z;:�,�'�:Z"-.,.;� ------- .,-,-�
.a�
__. .�_
C__.a�j. ��,,�.Lfj.;�,
.�t�tf;�
-��il� -�� F�, �'--E-2'iliv-�4`- , " t��' ��iiji:�!:�tt,", ,�� - :::1-..t:z::
� -� ,��-� -- I 'j, , .n,i -A,`��,,;�,�:�i ,-,,. �,��5i�tlli ,�,,",�i, i� 4,:ti
- "' �" - . ��:,"-- ,-�i�;,-Y - �,,�- , -����f.,,�'i���""L��.,�-�";"��.,,�f��:"�l,�',���i,-1.�-�'�-,�."����,�,�i,��,-'.��,',?"r�--_'�- -!,,�-.!`r�'T'-"'-,-"--'f,�--,u1-L-, -,,��,�, , .�. ,w
1-1 11-t-I- - - V:ilt, , -- � ... � :1-ei -72��t......
- i "- , , - - --. -:,�,.mc�� -.--.
, -7" - , �-��, ,,�-�t�ii��.'
----,�_'--� �;:�tt-jt-ij, t -, , � �
� �-�!:: ",Z� ,�:,'�,�"!":�,`�,-�:-,�ir,t; t
,�- ,
�
..� ,�t .�,,�;�,I�g-,�tia 7 4fiON.-� .t ff� ,----,-�-., ;,%
,�',�'.-7�,'��-�-.*--"�--l�--�-.� , Z,ti,.- -.1111-1-1-,--11-1.10i�& 1
�t�.--i�-, i,�. ; � 11--I 'P -'�ir�!-fF tt�2 ,- ,
-- , -i.,;�r;,�-ttli;_I-I , I �t -- ��-,'-,-",'1i,ii�,hi-I I "I.Tjij!N t,:�Iiit���
- � �.;,'��,T�f��i��,,,�'�,,',.*�'-'.""., ;i,f� ...r--- -4�
=1-t-,i,r.,'L.... ,�l ,t ! I-L�-1.�."--1, p�,,,�I;��:'
A - - --,�tt. I , , "4� �ii.
,
, ..
, � I "' - �i:
�-,�;,����i�;�::��l��i'--,-��,.-.��.;t .],it ,��i i� -s-.-" il� ,���i"".�����..--:'��:'.�,����
:.: , "I't - -�'tt;-I�t.,
'IF .1 - ,. ;: j-j� �I I ��i� p. I q%g�q ��way. 5.A5 a,m -0 o -� I
,ci:��!-�` 1 ,�l�'��i:,i�����E!�!�i�,;:',,.:;;,��:i!;;--;;;- :;......t�;,�,!i�......��?.�i�i,�;�t;j�t�!;'ij :�Iii!:It,R�,:::::i;:,��:� !; 1, -��"Z"�!i, I
. i I - ,.��-��.�,--��z-fl.��-;,�.Z.;,�� ,.: ,� - ""� itiqb-i10 p-pu �i ;.,w;1,,j;ji1)1i!;w!:ti�:it,t',
, ". - - �::i,t. . _ i.-� "
-- -�= 2-, �:�-��,;-;,-i.ie7�`;"! * , ,- `!Itiit�4,6u �,?��`dim��'! ,
-E
,;Iz,�� ,� 'IF, - F'R � ,;4;,,-��;m�t�,�.
.,z�:�;',� ,��ijq,,p , i dg-,, pd 11
-� I t
- * 'I .,; -i�!�t�'r '-,��.��,�".�'���'i!�;,.;,�����,!�,,��,,,z:�"",�"�,,�l;:��;,�.'�; !`.1-.*,vi:�!i��.. ,�t��;i � 7:
, -��, iz:�-K�`.'S�ii��P�.;�� � I ,"-,��,;---ej��,', -t
- - --,31!1�(��- I, .L�t�:!�-i�;�j ,,,"111.1 11-11igl,- ,,tt;�.:i�;J,ttt,, -'��55j�i Ft,,��i��i�R '.��i��ii�;i -;��i:%, -',��,�;i,�:;�
Not kj� ,�13�5�i�'��'�z: -� � ,,ijkl'p Iii!fl--,1-_---...... 1��;!!!�Mjjlijllv !,�111!i iiii�iiiii!lliiiii�i�ili�,,�'.L�i�;�,z .,I��.",�:��,i���,��-t�'l,��,,:
, ,,, �?.�, �i�!�!.-�-�.Ti�i !
- ,!'������l�,�,"*.��ij��-."!�ill�i,i,-,..� 111-1- -i
- , -....1.1111,-� � 1-11-...- I 11 ji�!�I;i�1 j I i I , � �
,�:�,��i-,4! t-',;�.-!�T,�,� -� ",:!����'.I���l:,..�.'�---��.�. , .
�%;�,,;�;t�,,, ,!L -�- , . � ��'I�',
". .
-��.;..!,,',,..",.,"".,.,-�.,�� � -,i..;��,!.I�ii..',-��i-,,�47��j��;�,-,,�,,t,��;��,�'.Z�!i�,,.!�i�;�;;z;�i:,:. ,", !it;Wi�tll,iNiNIW',�Nzt-
, ,." 11�---��,:-, ��i
��-�vt� ;-.!�
.- -:� .
-- �.-::kt,�t�i�f��;i��;' '�t`,�A�:i
-'�,.',i�.', ,-.;�, , �::t�::t:t�:il.. .... -,�-,��t�i�t�f��;!��t, ; �,�.-,���'--;,�,�I�.�;,,*.-�---���;���
,i�;��,�r,-,,��--,,�,-,,�l,,;zi-���7�,.l-.;,- .,-"--'-ij---�;"�', �-- ,!�,:Z-,-,�T��i��,;,ti
_ ii!ii..��,�",4�j.".",�;""i�,�,-,�",��:����---,���,�'-.-�, .��i_i���it f.t!!i1t;
-�,t-i,,:7;y;-1ii, -- .,.,�,�l-,�i����,���.�.---,.i����i���l���!,,*�4";""��,-�""� ��:4tr� % t�,:i�il!`i�u�i��i��,,�--,,�,�.�,,���-,�,� :",- ;.:
,-Z-t:tl��!�ti�-..?�- -J,�if-- -,.,, -����---g�,- �pii!l,"",i.,.-i,--,;,�t 1 i i-,i� -,--- - !�� 'L�- -11�I -�: "��;:� .,.,,��
-, �-:�,,t, , ,, �- ,, _ 1� . - �,,,; � f-- I �"',`zl-`,"��-, -�:�:��%"� , i ,�.,,;�"
==��- . � . -Z I ::, - - ,, -
iz-
"�n'. '� 't, - "a " :, ',.-.--`11--�,--.,:,s�1--."".-',,�,�z"""I,t",-.,��,i��,�*,,,.��: ---�i-�-,-,,��,--,.:�.-.:,.�,,t - `;` i-.�� �---,-� , !-,,���,',,��'.--i�;�&,�---�-�,L-�'�"',.,,�iz:- , -
, --�t -z . ,- , _ --t
, -��:',. �"-"�:-�,�.�,�t... , , , �
".-- � . �,�- ;--, 1;
-2:i.'��j -'.'-�2��,:7.-"-�!=IiA=;, - - - �?, :�L`:..� lmi��--,-,'.t--f---�, , ,,,'k -�L-------1-f.
�,-- , m��,;.
. ;,
. 11
-
�-.-.---4 , - -
-1`f�-;` tt--�--: -x�,�-, -i--- ?,4'-� - �i."�:�,*-".-"����E----.,�_,,��,�.,.,�,,--�.�L,.i".�.7i"��,,��ii�
.��-ii�.,�i'L���-��=-�,��l-t-�.��-��]�;-i�i.�l"-.,�-.-,��--�m;'l—li�-,It-utt�-',k -ii�y;l ���,,-�,",-:.-"�,�,;,,�.���.�,�,.�-�L-'- "
:- !i-,,1!-R!RP',-"1 , �,�-5--"",����,,,��.,�::,'��,,��;,�-,-�� �f�-����-,��-r.-��ell�,,�.,��-��,.�-�
�'�..,�-�.���'-�,,���'�,,�;���L'--�,7F7- "�,�'-,�'�l,�,,-�.""!!,.,�l�',!�,,i�,.-",--,-�,�,'-'!�,�-��'��,��- �:=,;:
----��. .i �7��,,;i����.-,.,�!,,�i.."!Ii��',..�,;,��ti;t.
�-�-..t. --!�!, .... ---l'�-------,---i�' ---i�j'�.-!t� �;i����ll,�'�i.."Ii��".";�",� -i,��
�, ......�.,? �1� - "-- -," ;1�- -,-,,--,-- -----,�,,,�,�;-- �� ,�;� -".,�," , --*,.,-,L�iz:, -,i
�f",�,,�,�.�,,�,�:.�,l�4�i",�����';���� - ;,���:--!,?��_-,_'F;'�,-�,�-, g,4_�1, j,_,,
- 11�.�11.11-111-. ,. -: � --, im� -!�'-,,-4 j,��itn'.q—i�- ,5�i
, ..--i 1-1 - , --"t��-I'l�,�llil'��,t��ll,�'.��,-�.;V,�,;":,��.,."L---�"� -ii-; -"�!'r,!-�Xi--,j_�-�, _-,� ---�', 7 t zj:��,:��i�;�i�]-,� - '.--".",.,--- -g�'..
, 4 t.-.4- - .. ,�
�11---11 . . � �����,.-����,.'.,,'..�'�z��!�7--�,,"�D.�I. -�i
- �i,t�",;�,-�-,��!-----.i-� --�. ..� 'Iivil,-O;!W�,�.E,��:, -:�:!�,�,����-�,,�;-�i��',���,��!���',���,�z:,�,1111.1j�,�,-�ii�,:Ii -� �T��,��P�,,�, , '191i:fN
` -t F�-.F,y!ii�� it�i"�i, -.,I t,
i'oi!�i;..�i��,- .---..-. � .i
��,,� ..-4i;Z,)z ,, i� �. -'-Z,',
, - � --=4 T ,-,j,,;,zi1,:i!,t W!��!, -1.1- � It
-11:i,Z,ai�:-�tL-1 _-R I .1P.. �;j�',-',i����1--�,i��,;i-,;��-�':��:�',�,.,-.-,�"-�;E�f� --- ifli
��,rii ,,Lil-i,�i Vi- --- - �!:i�� 'ifi�-7�-tt',.,-,......�(.it
-, - , -T ,tj::,-"-i-,zi L l�iL��.,��;."�,.'�'�;��,,�i����.. .....
��L.-�' I I I �,-i-- 1.... , �.- I .- -.,i"
1�1 -A�'��553 , - �it, I
-;,:�:N,Pifi,`K,��--,751 -III. - :.-T,.,:�,��",:,��,�-,�,�,��C��;��-,_�.;"�.'.-.;i�i�,;l��i����!���i�l��lili;iiiiliiili,5,,�i�!�li;, ,-,-- --
'� - -, -i" -- ... -i1t::;1;1i4.i-;11.......i;�l��i�iii!l�,[i�'�-e,,���.,.�,..--;.-z -ii::I; It� I
- � 11- I ,1*��,i'����fi�i�' q,��',,"�;���,,',--ti��L.�,�',�-,�',��,'.�,��-.txi--.
,igi-%�,.;;�,'-H� � ,:,:,%::Ziii,�:�:�-�, ,i;�.,',-..*��!�!��4;s,�:;-'-f�,�".,;;�k,�,�,�ITT���,
.. ,--'�i�*�ii�;,�-�::-z-z;�,;;I�Z-,��l:.I�,�,��l;ii",",�������75��:�l,��,;-�,�!.-,F"�,;,.�ii�z::�;-";t -, I I ;�i�!�"4;--;r.,-,.;:�i.;11-N-1 11116,,',�t" , -.1i1-t-`1it---,;j,-v!�-,��ige,j��'g�i
-� . ... � -
�
t�4-,, --7 -�! -�,l���,����.",�;."�",!,"".���i,'.,,5'1i;1--:, .'�:��:;:""�,�,.,��""��;����;i�-*I
*-�'� "' ilili��i�;;�i��,�:���,'�,'���',--,-�.�,�'� "�`,, -- -,�I!i!6�i-�.�i;i;AT I �. ,
.L��'!-� ��,�,Rj� l�"-"����-,��;i������'i-�;!�,�"-".-'�,:ii�ii�ii�� �I - -'-L�-��;i�l��V'-:It
, . I I
1 IT! "�i.,��111�"��il�i�".,7 �,,'."",�f�,,'�.i�;,,�,��7,,-�;--,,��,�'�,';,�;�,�:",-���-'��, -"t" .-I-'-. ,�7,,�'�,�,�,"'�,;�,',',,;I),��.�';�
-,", - '; *---...
-.- � , � , .."M"; z 1!!�A 1--`��it-,M,-'.--i�,A�'�-",ii���,�-�z 1:�-;�,-,-!-t-� . ?:
;xz-�,i�!��,�- .� , . ,'�t,�:��:��---'!'�-�'�,�!��,,,.,;-�4�'�,',,'��'",���'�,���i'�.q�����";�,,��!�iji�,�,-.i;�;�zl;���l_,;,�-�;-,,��fz 11 _r�-` I
, �, : I,-t,� ."`�,i�,I- .."�,�,,�!��,"���i���-""";!;;',,�?,-",
: �-,t'Z.,,;-,'-:.!i'.i�Y-�:,.--,:�,--,�,",i,Z;--gi� Z,�-t-�-�I�i,�'%;,I�I�I I�-I I 1,I I I I I I I I I I I-..I.....---.ii�..'�,',t�.., - .�"Rr-,- -.-....... ,
�L;�7.t--.��-g�;,g."'.., --.t,i;�..- ;i I . i�i .
� 7�. ,�;1, iti'- � . �A-�,i------,�. .�,C-, I
i -�i!�-;,"',:1,;--t-".---Z=, , -
. --- �� - - - � , -, - '� , t- -i=!,-
� --- , 2 -�,t: a : ---,�,r,,-';,-�-,,,,-�t,�,,it?;4:tit�tt,'2��-__��-,-,�;z�'..�,���""�,��-',,;i�-��'.,�'�, -
-I--- . , , ��-,�tt�%,,�, ,,'�',`;
.1 ��-,�, ,-i.��,�'�'!"�,�l;i�,---�-t.�,',�-��l�'I �!�ii!�?����,��-'.,������',i����.;�".�',�-;�-�-.-,- , .., iti-�'�,'t-,,��. , . --
�, � I . ^: ,;-i,�;-�.......,�,...�tj;iji�,it,-,.IiT ��`i,!i,;'.,',,4_ --:-�i�--'.'K.-�,�,. ,
-- 'i- , ., _-. -, ,f�t,t%, , `;:,� lt`,��.�' --,--.,� Ti�'-fi't',:',;1'1t',T- ,�-.�'.�.-""-'�-!�',,',,���-,i,�"""---.;,�,7�r�.�-- ,.%-�!�t�ff�
i�.,-�".,.-.�', �, ,_- -,E�T',,T lffi��, j
11-_ ��.��F , 1,�iz;it !-,,
-n7R�D,�� !-F- 2?iJJ� ^....... ,��,--:t, ---3i . , - - - L
=�=� ,,, ", �--11 11'�N- F,p"i" "'i'Nwi"-ijE-�t4:-ZZ � -, (
'�ii- -i,-',.. -,�'�', .-- RRI!Oi��;!,�!�,i��^� - -, ,'�4,lii��.l,',,'!,-,.-,,t��,,4i�, il -
. -Ei��- --r-7 ,�--����-.,I,�,'-,�;-�LI,4-,�:;,'���,�� - :----2---� � , i".t,
, -z 1.11,11,". i,-� -, ,;� Ntiiih 1-Eijij�---, ,-...........�-.,;,��'�-,:-,i�;I-i-�:��,,�,��..-�;����-�",�,--.,,.�!�,i.�-��',il�i�--�F.,�t.",�,�� -.Ti-
�ii=----,:m -i",!-M.Mt -5B!!�-Ttl� - �,t-.-�j,
".-11i�`,.., ,�- - � .,
�- :�-ti�:�, ,.-- -.-[,�-.-,,�,-,-,���'i���!!"�.,-E,�?�li"-�-,'!^,I;i��",,!-,-'tt k-�T�U�i�Rli��"--;, ,,;,��;
---;A--�,--.- 1:= OW-K. q-"',,!� Z!Wfl�--Ii7,1� -�,--;--7z.-Z����z,if:.��!�-�z��,
b-111--��;, -� i. _�,I<'.,,�',,-�-,�,�- �-it�."a,?i'ji�,';T�:j ;,I-."",.j-,*- �-��--,*'�-�l-f..�l�-,Jl!���-4,1,j,!i .-,-,-- It;
-- - i'l`,M -'..�,,',i',�,�-.�,.��.�-,!Ei-,,E���j�ii""��"",.,-,�:,�.-.-.z--�=�-�,��ll,-,7�it:����,'���,�,1.,5�-,;.Iij,��,;,���,:,;.",Z."-7,- -1--111-1-1 f,
iz�,-__r.:74 7",---- -,- " - A"i�t,';i't,, -r;i;"��` ,;?��,-gk,ttz: '��"�,��'.1'.�'�,,�","*,."-i,'I
11 . -".� - 1.j�4��2� -`,e�:��!;i��ji,flj�� ,,.*ti -,;,2�,t2t 1 ,7.�, , ,�� �:& .-
-iu� ", ,- - , , -ilg�,,�V,,�, - tt - -ig$'@tfx,��;','--�;."i���:�L��'���-,,��,�,-,'- --.--�.i.:1;i"it:
, ,V---�-, ,;K-,�J ---. ` -� , � ,�' �i�.-,-o -- -.!L, - - -�--- -
I M�,�I..i 11�--� - � �-> --Q," 'T M -1 I.-.1.�il:,i�-,""i",�",t�,!�i.",i;"�,�',,i-'-�-4-�,,�'.f,ii-.,I��"T,2 --',-T,5�--,--z-:',���'.�-,�,�li'�������
, , -� ,--���!Q!,qii-�,�r,,�t.n, it.
R ,* r 7��-
����i�tia-t' -��;,',* 4��.-- -.z�!�L"� -����', -i'l ;;,�
.�N ,, �� 44
- .,�A�i N--'�'.��i.�, -,ff7F,:--�E�--�- , _.7.iit,. -, -!,fff,,!f,fi,�g - it
-, ��itt 11:11 , " -v.-,gs�;�,,-,- I �,
-W-- -', , ai�,,�,�L- .,� .2
. - -- ,:-w P=t% , 'r,r i,-m- M � !�
� -��g!t----;��'�,tiw� - , , ,.Iji,ii � .!,S,-.iM,,�1-�ti,Ai-t'i��.% . ---"- -
�� - -.7 ,., .- �F',I j 4 �"'�,��-,��'�i�-,�"F.L�,-z:-2�;� -ii, , �, g',., "ii�a�
11�1 ",
�1.
�f
:;
it
it
;��
t�
.t
1�
"
,..i
I
-
I
t%�T".?,! -,�----,-,--,- ......- - - 'i;�t-,"z - � -tjli�!R-, N 'i , YiK��',-K�,[�,j,;jil�
� -nt -,�;`-�--�-�.,,,�,�,��- IxW,�- -,,:ii��.-!,EI ri; ,'13
, ,
:��:'it,-.��-4t,�,�, ;i--i---;�M,51-F-v��i. ,!��Ni ,�,-tq!W,i�-�w�,i;-:.If� , �-,,-�ii����,���.?,�,,:�,�-i,;,-,�,.,.�l,',�-�,',�.�,i",-��i";�-,.�,,,��,��,.�!�, - �'i -, ----t`t.........
, � , , " , . � - � - -�-,'*.',' -j,-.i--* " 'O �J���t;lj�!,;,�,"t-,,1-��,`:,-=!�- " - -., �
, 4� r - � �:RRNM�,',',4�:��-'-�n-!!;-�,--��,; "
. - ,.�,,.F, � ��--,,z,,l:!, 5t ,� ,-� ". -��;'�';' -`,�;,`�:,--��,�"�,-,--�. ......_''..
'W'i at!�.-::4F - —,��i 4--�5�1 � � , ,
�,',ttn,*,tI� ,8.., U,-� z� - -�Wi:, d�-ff�!iR.'M��,llf:j?j!lj,ji .,!'O' u
p�l!;�;t�-,L.P;- "i, -! �.z ---r,i,�i�-- , ,�,,�1!,.I.�,i�,ii"!,,;�.,il";�itil"--"-�-11--�--l�,�----�'�l,..'i-,�r ,�R_-.I�!i��:�,- N �� ',,.;,
wl-.�:-, I.;R) ,,,�l;���j�;i"�:,�!������;,���� 11 itr� I
". ,����,�����,�-,.;i.,-,,;I��ii-'�'..,.', �,,-,", ��� -, ti-qvn�ii;,j.� .111.1-1 11 .1....- ".�-74-,-�,,�'��,�,�A�,�z,�'.1��-C,zv,:I�,�����,,��.K;,�.'�l',
M -�-","�i!�;��������,���,'���-"�'�!l�, ".I,�,�i!fii)li�f)l;la oc---,U�!v!v.,".-4&-- , . .I-,-- ,",,-��i-.z��,,�l,-',��t�,��I��,*"�4!�l�l,'�,��'��,--'��,-,,I,�,, , �j,;3i,
. ,. -- --t-, �I , , i,,�,�,-',-�Pr�i'
,i��Jii:�,�,O,,� 4"��ft--�,'!,,',,Nl,���'�i,,'�"4"��-,'ii�'�,'�j',',',,."�ii,,',�-��� `j� i -- � I, ,t A-1 ,;- -, .
I I" .1 I�it-"j,"i-I...... i;,�,,i:iiii,,�;�i,�'.,',�.ii.�'i"L�,�'��'�t����i-���-.,!�tii.,-�,'r. Ij 1... J,,!t'!,,Ip��J!,,g�g,-
7�- F-l'i�mi:�,','i���:,��,!�;!,��,,�,,,L.��i�L, - � ,1z..k1;-t-"'-W. --'--lizli"t!fz��I�.......!����',��');":'�L�'��;��,".'�"'-,�'�',!.��"��'I-,.!,I ij,�!:,J,J!,d ,- T , , .,-,�
f- q � J�,;jjf:j�`,.'J��,;t"�-��-- �,;�- I ��,-.4'.,4'-z'l�j��.�,�",Lilil,,,�i,i����il�;lill,ii,ii� , -, , �!_���,,�!��ii!z,;,I�R,'�f�-',','- -�"`11� � 1'�:
, -,,
-.-,�I-"I;Q ,Ffi,ti��,,,.���i�-.-����,,��,,,�",-�,1,!i,i�?,�il, i M!T'-'i,9iiiiiT1` 1�,!�i,l�� ]� ., -, -;!�,�,��'� A�
,IT$N�l ,
, . .;-Tzi�-k In-,-...--%R i'i�YP ;F,�----�` - 02'!; - -�-;`q�mj
� , `��P�`
,� - - -, , j�,'��;��,-ji��.-� �'
-� L .i - - -P ;� '11-il- I-,;,%-,j,j;.1;j
, ""i
.�� ,il " - ,.- t;,-
- -- '�;��iwiu `- -�-.;�--��,'.,. - ip, -2'.�!', -:T`,,,,�""l'li!�.,�:'�i;j�i��;,��,',',,�,'�;�,z",�l�',,',-'il��i_,�f,�:� I , �Itj-!-.�ttl:!;:�.- -1
, ;�- -;?�,Z��j*,j�. KWRIH.�,%"Wh. - .55,,';�Q,;;R- A': ij3j1Nj,jj'jR�-"zi I .. i!!jJ; r
, --11-1...... ,l� ,%;&'�,�- - - - `ii�l:;il;�l �,-�:Ei-'TR,�R 1 t4K; lii,iil.�)N.�Ij ----.
!,��,!k-.,. ,��M.5,Z�.ti�--p 111;:A:111.1""M�t,,z-"51 ,iM -!�,Z�.)!& �i�.*�h' ---",I- - ,:t-`�t.'--`,�!�Ti!- Ilivp � L '. -
-1
-, I .�
:.�.
... ,
-- _-,-��tcl;'%�-'�.,,,1-it.-, -Y , :�,�,41:M '.., � I' C L,",-G, --�,' .- , 0 , -�,-, ; 1,1; I
'U`� "'tz--��P"', 'i"" 'A -,�-z,.�;!, - - - `�-,,, " :� -, . "! I ",4-1 --..,$;�U',' �t.--
" - i;il�, �,;��,":R ., j
- .. .-4 -- - -2 ImE -- - ��
, - -- —0, K;;Tj;�,,�i;dj 11 j�� �tqz=�i�,%-`fr'Nk��N- �-���,,,��,,�!!�,'�:�.,-i4.�,��-������-,-,�,���.;��2!*,-, =,j ,"-..�`i4l'�.',rz,;,J���-,,`-:.,--�:.,,.� ,-
,X!i
��-�� -,*t-!�� -�� --z,"`�,,.'�, ,0 , .�-i-,�I;M! . �,2t
i�5, . I
- � !�� U. - �-S,z --,i - I
.�- �� .1 1;j;, ,
� --1-- - �-i` -',tjiz_-'I',�?i--,!�T�f'!�,I.z. --w ", ';��i�iii�,,�tl�,!.. �1.I i-:
�� .--- �-� ,!�,,;,�' ,,,, I
i.1 -- ,- ,j�, i�,l�--�A 1. 1,
, -� ,
, i i-.�,i2�i"'.-,�,l 11�,)."il�I�Iz,�i:�'1 t r."',�,It z I - P
=t- m
� tit
--1- - -
. -�-�
. -"-.-t� ,
v," ".., "r- -,-----:-""7.TfR- '51P.- -'i'l,
, !��-- 11"'r
-51 1 1�...I`�I �': ,R',�o,'-'!�Vil �---,
.�. ,D!,
11 I..I!i - litst� �?;trl..i
4i I,", ',I' -
. , t"i.'-',�--,-���";;",;v,�,-;.', 3,f�',��j;- I -1
. . .��,'
, , , , --I`i!
i ; i � , I .il�t"-19 -.1,�.
�- i;tit k� .:I,i� - ,� - , �:il�,
.1
4�'i. If,.;" ... � ir ! .ti,� .. I `zt i it
,i 1i J ,� I .��t: 14.... .I... 10 11
Y.ii`d,s. '•' :F n�HMO
stsjt,'_�'.EE! i �•F �' ,)a. •;, S
�-Y.... t T.`• �- ..' t�'..'L�.T '..(� .'�:-'.%',�tf".er+5. -. 1,,.. ��`.. �'C e,
�. �; �•a�kiii -''''','�S'{g: �r=rra:. _�TT:'2:` __-_ _ __ ;c:r..- u l..Y�.i FAs,!'-.�ny`tGn,,.0
f,islYiy{'•,k� , - {,'--
IMM e{ks 'ls,: yu�gg``"tarn a»•>E.t.}s.:`i
�,'�� �• -- 1. F ....��5ti'!��'tn�'il.,fNs--•
.
HEM-
;5.i•LutVJEX.'4'.:{ i i iFL: ,y. p I� ��i{Yf
rh6pt f - •�
..Ira F
` w
tzF �,•i_ - ��
Ml s(iY''S""Yf,—•-r`rs 1 CtJ _`-'•�-rtrii:
......"i...`' -.Ei{s •,t,?P.:^a;•:.,T.r .ai.i_.:.......i .��..sR'i� F F ? 3:x':'t1i=�
-...:.iJ. ! . t'+{.{.i_. r Ly t ...
s :....z�: ! i` {rH.�i.,-.., ' mom �••St.s �:{cS � F>�'rt!�{T� Rw�i�r• a � � �`'�--
,.a^;i4 .:i&5�...?i• - S.i Fy{_}}tt ,. •••.' 3 FSS{ .-r•E ��{s, s{'s "' .mx^.._,-._.:'.:..: - �+,.. +.h•• :
'_�.. _. ._...: ..._ _..-.-'!t-tl,+•.,_��FFF ..:^rs.r•. - FEi�,;S: ffi �r�.7:• i'i:„ � sII ::u{•: ..>err :rP,
Wt.lfcF!t�s1i �a• -. �. �, s� Fft->-•'s• �xn.i 4.F��• sem„; � �r' R:T• .._. •-s~�:.»...r�_:•:"- -"•!,_'-.st$EfiE'[_E!'
.-��£`�.i� r.'=+Yp ..s.-.��_«..__.,"'1't„r„,K.,s:�, ...�?:•^ .c:.-' r�_
4{ ,
�'�r. -� -fr. �'(v'{Sttuiei - ):-..-'';-- -_ _ ..:+--`"3't....=-':{r(ry•_t�� � ..,s,R „I ::�E-'^:as_ --___ - - •�_`'�..-
...G._....�'rv':�• S�„*s;.•.F
'_F � •;�^.— �.k��::.:_._; ... ��Lt��°_ :1 + '`F .,{ler;-..�•--: ---^a:: _.„,_ -_- -�_".:— —Fj
si
e.� n'H`^�`. J' - _ zr_ '".'•�••.s.":a� ;iE z t ^.[:S=P., ,.''"sa..:i :__ -
a»..t ._ .._ t;.-.-.-.__.:.��_.-x-s;..;..:_. •_ ._i-:,.........-Y Cs.:n ss..5[ t s •_n;!a:.ks- ___, as:•..
3s:""_•"s:r=";i .�"'• u t F•,jis:�nN,t i � J'•-_-a- _ + -,`.'•»'•�
.) 1 �1.1 •E t "'• H' •K. - ..-3.tll Y•L'X'...^_
, t _
9 h�rJ3-j.=tet' l� iiF S ti 5:.{ jt!S «_M• ..
L'[=�v.... i'' :.:;Y' }.. 1�S`F^5^-.• ___'-xtl
t�1� _
t"�`� ;� ''.• s± t..%�" :=C , 1 � Sr4@11r S: l :. F;' :. .F;. - . Y,
�.ii5r�•.-'_?f- s-- '{ s_:. - - - :i...-, - - _v7 _ ''4:�s`-}Yi`-"•.--fie rr - _ -
�=.YYr�,a���? `<1>f+•^,�-'c•�n.::l`R;1,.: -_Xr'i.•5...-" -�i•'._.ii'�5;~.:.�:... '� F •y. '"y
-r� -s{a�,ss ,• fir'' --- - max:' —fi 7'
-"rm;=--:-.. _ x....� ..',L*,,'•;'« ,::• •s5,,.{-:,s._..-r,.'- a tie i--;.; :" .A-• _'2 ° ` : .x�,
_r__:�.`. ;:•a F FuSrJa 5•i :F:t .r. L,• :r?4: �,.. R n -
r i;tel-u " F r�yy J,� {{��.jj.�,• yl �r I x_...s.
c•. .a^.,' --- �F ; 7{`�'t(-.IAl1l6at'`• moi.-SFw�I. '�3 ..;.:r''[�i
F9. .., ��-�. vs.,.•:FF,,{••�{^ie'i"tr=. 3::a{� i a'f� 3:,¢.�.F.•$;rjt',t{�.. _ _ -.:$ .: "
i.a. -!.Ok• :iNr.i� `t)r ._ s-1-
C �
.IPF }Fr: 4• i` .) ¢. .• fk: `P{•. -.t-.. -.:•• _ r w n:::i, 5,.i5.•HOPE,1 ro•[.'.
r1_ till-1 3;' b t ^ ._.. _��_, n
�.a� ..y-zr. -�R`• .'�.'s• 's ,,,y "��''^st^ ;<Ei:.r.. i�'
•`'•i 'iE:�F [RY-e :G:frtii. - •Y iSrYts:fetY��..u '-' Sti:{ t-�(,^rXfN �'q ''_ }� .t�� y.FP Y�'•j'j 2 F1 _ Si 5' .,q''�,�.'.,
Y� MSF .s{g
S`S. __ _ !L_��`':l.-r.::.-t4� � '`i7•' :t• li,.:i`4{'-' -hr'-.' ' .,-'
^533. _ _ _ k ,:E� .��� __ '- :.•9': svZ"v .--•'..i'?u�'_` ,2 E;KRf
}:9.nr,
s 3_,•-.._. ,. t •-"Fit=- _ _ _ L.[t - is;;fkty _ +5, t s z. usxrzr,...::."'. R
�z^cr••�.,.,..�e^:,'..,-s_^_ssx., ;%f4sxtLy.i SW'a"s_ ,: ..•.._ r.'f:' - ':L~:'-`�,:.'%>-�, r.4 ��xt .?i, :-�cSiinY8�2.�e'a�[r e`�'.v'-"'•r�'„ 4, >.�., .r ..._af
Vit'•,�-'^z'i •{4"-`S r�..r., _.. .Wer6 :§ae;: �,',�r 'v'u's'-».• m'•r.r'•rfl..iti..y:![..�':. Ra?�'F <ci'si�- ._•_ )'�r325=•1:.i:P v�I iu `�'.'-: '�-,J.,' �Fizfi f%••^•3F2j1y.
::�x:.t ...,....... 3. a ----- -.r ,��5 a�l K'-�'{.,,� Fr t` S.h �:-�,,;., s. !�_» ��� -{�y;•,
f _ 4{tS t{ {2.rs �s Ear•f M i? f,;; ,y .} s�i '• 7 ::. F,-
..:''�J' �5-,., :s�iu7i='" frP--;c• ''4'.+•L-<: �G 5?i• II•n: ti 3 {,t?•E!.�! ;: 56 ' m3•!`^,y'yu'i' -
:.:.•• f^:: :t• .j. t)i,rK, r-' FiR_'�tt„ye- •,5 )"t.SYh{>r��f!''�:•..r:�.is..I,•.:•-^.<(.� '`p,'i•.:C{:..._. - - - � .�•S!�.i �Y e�=?+..:Y^�r�,..).Gt .,Ic• 4-St
- Un iRrs•c !?' _ •� t (�4_ .•!F, _ a=.v? .L{) __
`.2L.1= .ktF r,,�}is ,Y.n,.„ :r:<2'`•sr 5Z .n-,i• Fr re.1
-�,3. `� ��)•�" �'` }-��..�..,�_.....__�?�pe�i'k..S�:S��, r:�i�ri� ,�; i: ..�:tM•:
;;�: �rir !�rii-f'tu?r.,5. :c:u'•LSsr \t•�yt : S�•{F�•j,sp? •F.u„L .•t.{ ti'•.s[ :;:•t cr� _ :,.{;,!r var„c., ,�.{:�:t. � ..Jn, .''u-;.:,.d5}x. �
'-':x. Y., a'ip s�>- :t_.t^:• :.3J .es•s., 4• fu;•a 'zc.::t....{�,r.'.•.k:•s :;nf,E __ 'a s >.`I-;.-'aic:*- _ r L•,•.Y ..
z;; �, -_ - �_,�•' ..�?`r�'- =w:--,•�;�. -� ��' t fig. �t!�`�-.,._. ,:vim="...:;� 4, ,.,z:::?'..,.. ".' .-�{:, r_��.. y,;,„:ti�rr=• _' F,J _ '��'F�E Yrs
i§• _ - _ •�.�r..,v A. �. t tAs�) •rir<f,'cs',;:•�?• o-i't:_•_l.-, `f_E��������:11 �.;•.���' '.-.•
%t-- � 'fF. — � wrr ifz: r,i;T^,.c�Y:s"'�.�= -e���.v_"•''�',�g,' �?�i.
__cgs,wrm ;f?;�t�f�i>;3.t�.f�,: - :�.'.r-c•t'-^-..�:rmi�:_- _t s:- - r• fr�:.._�..,.,..:..:•r' •c'-.
E.[
..^„
I.
=?� tn. rtc� e ^;.L _.3..� erv �A
f % - _ - w>�=<�:t: "' Ft, 5 c {:`k s Rs xCJ'f i�f f
MW
MY ._ ._,t r,:�,t ;,fist :'.
+, __iid�•_ m�Ficr_r, rz ".s �} a-- [_ -t,5i',{-.
.-i't{s'.ds .r :F4,..:.r" - _ -� _ _.+z�_'�-4re=tjd_'':weLs't..c�a•o:c-'_.::siG
* ppy EE .:t•4
... r':r.:n.::+ 3 F i G11 . !� L) i5L
4. z•,'�`� YI IIS ,liYiS.-.._: '_.e, 1,_.[1 i; 'x ,� G�l?nS{� I.O i f :It1ai 3
-Ru .:s5 •• ys s i iseie�a [•u(,aL;s _ .•'its?. 4utiifi �• s"''s'•-
4NI1.j
:d t ;man lari tri r r ,a t. :j�° z l�;' ri d^i. •�aA '
h-.• -<,y�3_�•: _ __-_ _ ?^,?_v": a i ^IYCr:S v.+^t �irz•,^ Fl.,s^4^.teru,n{:Sz 'l
- .., ire,'•;N:,.-',,-;--su''•
- -:..r ,sriC'G:�•=FAEci= "'�"`'ff 'I;="'��itn :' '='i•Sif"r.'aE'[�^iii'+a: __
?. :PT. _
,.,- . •• n„_ �..�i� -F. t �r i E.-
4
ci;aEn s ffirtYaF$=ieaC ..._n.,,,Ap- 'R: .s
1:
IM
:•:'.C =.s:...u:., ,f_ etFMr,11e�an %6 LIT �•!,tfi{ ---- - -- - - - :{.__- -.�'e_
{i•�l.,� - - :: i�tc.rtk: ,.{. i¢i :tflQc .c_ttiic�. .�.ir.�_�„ F _�_�
�I;y= ;;i' 't' Vii;!' ;€i .£_.,„ _ ,• nl.. J_ _..r_>� .._ .. ..,_.,...,- _1rF'r"ee,
.
A�{�tt' - - - 5'cL �6 ry;u _ ." `1,=:. lY�ttl •[IaC',esr 'R~tC'.” SL.a.::..
-- "'..'."3 Iff
II '' _ `e 4 6 :'•-e^T - _"-s{,M=' 4s''FEx':
-._ ':Ie is -5e"e ' _r -
- = sl-
::vr''p;5-� ,_ -, :?ice -� 5. -;:•'. 'si"�S,L--iL�,f:.:
u...,KS.R.....ui..-._..-.,..-."., .._._..._..-•___ _ „c�[G"'.'-'i
SRI
�4.�j'S�k y e�!t•n _. - a
y` �,riEs �r• =fF t� ..K)3 { -- �'3iR� n._ _• ;i`IX S6 ^c'"j, ,_„�i.-iF•-k�'!''M `slt
,-
¢
is �:
s
CTLGroup Sensors
Sensors and Instrumentation
_ CTLGroup has designed and built sensors and measuring devices
n f for more than 50 years.Ali CTLGroup sensors are custom-designed
x"
for specific applications,and built with the highest quality materials
• ill�
a^ and workmanship.All come with calibration sheets and provide NIST
.t
traceable results.
�.n
i..-^€, a: .p... ry�,;e•, Jy�....tx�a$.Yz tins. ..•:.:.r__.. ct,,,» :k
:9
.1M:t..._:
'., 1f tlLR RS -h..ia.3:�;st'..l" ..;.•f -,:"r�u;r..ari: r,t 4
-.5i�s,:...a^• � .-t �r,�� __t'-.,,,^`:Rx•..ryRi G=•'� S6_
"£i':.'t=� .:�xrMcnt:3 >r tit •:itn's?f:.�t,yz:,z=�aL�as
�Ut- - : P £'�i:•�S•S"moi^._ -s:»i5: F -x.z=Ivd`'�iEYe£r"C•_'e r
-' £"r?i. t€"ef::"ei:
�T= 4 :ryx t. s load rods ranging in capacity from 1 to 400
t
�t cam. ��i'�::� .:::. ::m•.r
RR#?Lt=1:az ':7Lf _:•{sn t___y
aging from 5 to 2500 kips.Using the latest
technology,CTLGroup experts can build
=ryl tl.�:js m,€.9€p£�u:'•:c::.d:{t_.r'z..r�'js-�'-e?:x, -,�: :iRi jis;
'F.cisxt -�l Si;xr..g ..r,•, i
p;nonlinearity.
M H3
__ _ ='=-� -s=-i r3?•i�Rs£ni"-n•n£p;E€iiF .:tu
•Y+tt.=.'�:'- '.:. ��=_• _;fir^E��n._..�.,t.
_^a.� r-.aixi=t`- •^'i'�t''°?F t,'�+£ai^x•'£;iz .-
--_ti:•z.—.:.::':::-.•�i4 s£`3t ..»:isix�' ="'�..= t,£.c.�f i' @ -�SctE:cu.clz.aaca
y�(=a.- .:c _s, s tom•'�' t�; •�r°uxi.:h�mtiFr-st:.:€=r:'-€z� �*iaa� =z€+''i+
„ t^ to 's�,- •fF z € 5-.m.s-.:�.£tr•° •''.e
t€h" ty t :.� €4ti [ ����p• -� •x..:?Lt.•i't. 'l�3;
lrl.�.. .. ....__ _ _ .•1.�6�.-__:-.tClFet•.e�P�a�v��, '4� � 1!t '
[y^stiF � N•• i ^€^-"=,r _:__.��-- a"t.T.z�.YlE�e`__t• mc. .�•-•:.r.:�..
tahfat€.'fz�D._� =I •� _ �'...t_:�' .r ...m. 5 t1� :• -..
ms that use strain
' tlt
_..-E�- :pi:_..i r�•'ss t�fieaC£li:r•ai!' •f< •;�._,.-•.••.
• k p f jXS. ;measure and track the
�:. �'' �_..:z�=. a i• =ata ��'�:... '?.".'.moi-"� __ - '"+£+ir.�i`..3`r-`.s•`"c.�•�sn._
1,-5 These systems are
:_-` �f�===�-�_F� �i 9�tw
ar ry..l €�=,f,t '`` 3xry erre ,well as to signal the
£tz€[[1�� ',3�1 'E! �,-€I€£ltk4,i•'.e. C�.kJ "'£:rs-•'..�___.- •• �.`Jry1 t n'z mi_
'•;ie7•:�€. F Ftlt ; �)i �titk�:l'�'ii'stS �it�;y
t€ �i•,l£i 4-.tt:;:1•Y._•'w '-'.•'xt.• Z_•Sa. =_� :S.-..`:3':.i TYS-£SAL• LS •'�..
ttSs£• a iii.£€s�[•�'�',au4%�ltiitef�^Lj..:���;_3is.ti .. .�,N
..-.,n .,W{r�ay£i -Rpu�i�rry - _:::Ta��• _ c �
Y'•,•t{= a.,w,'..•wi-t£z_::-:•�,.A •'-- •-_-_--�:--.._._..�—_ . moi;. ��i�2 �;tk: �:€-�=,x.�."...:M��:.a=;�s�.-;: _,�...id'£Csi;,_ ir=•��5:�=�: • :;� .�. '-= _ � •`s•. �£z't,�;.;�' ''"��'-=' -ter =-
:f£t;iC,-•rs��x".-r _- ... - ..iii i: : I^ •€ �€i"` '�:�G -.95Z
-�.. •�_... :.-.«
EE. :s_ _ -B e}. :• •.. it�a":ilii 3�xi.R�:
fl•,€2:,:_ „� x.a t? :i. f t i tr Exi'FY t::1ex:,,d:r._S_"�-:E=•ex
` _x=-.»....- �_ ..r:t••_.zl ' t�.n_"ti�,��rt-'- ya: ,,Ik 3.
z l{
eamlined and
-'J*.ct •,�t. i �.'�l{��i��i,k:l�?�z�£!'i I y_�:� ... -»aar":,'€ 'i�z -e::cr•:c•-2.
G6.w11 .:'t..: •'.[I `) 5::�t&. :...�:t ..—:::.: R ry LSC t,� :.i413J 1'
eter The
- �ruz•£ ''£t ..ir;.-•f`4C_-- -- '�Esel:l.�,..n� i�. ' �' •„�•.'�'ma cz��:
-am
uring the
Ments.
:
:+ f ! �n i,d �t �!:X�151 ;!€t_�y 41ru�_4:�.. _ _ t€� �to q...,..��•�
i 4t t:lH>S.,i.,... '[ :try-! :�• '• 0 K-.
:'!zq 'k•„'ej:ri;..�si�:b.,<:..-' .��5_ st .,3�f € i �.. a..c• _-^nak
,fit Vii'£Tr'""._.•.8 icsr:e'_ '1-
3
J9 '.C:"t'-4..-s-.• •�:.::,..-- 'r+�g;r;„�..'�:� ^€� �.�.:, .«r.�:�:,nR -r..!
j1,. -:•= r.CC•'>S 2r:c•'i:s: } i'—
,, u •'rt'F�,ft.'. F�L ' Y-c �S:•w .='✓' ,".i€€'i..'fit. _ F'ti'.d".,:a.
P!, 4 � JIf = ra 3i titfii ieti '°}'y" ?_,1t iIi"ril �'` r i:iF f.ts3+1iE €'t=- !L� i n
Page 3 of 4
Internet Message NovelL
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Jim Mahlum
Cc: ab@brighteng.com, Diane Lenius, James Dugan, Ingo Goller
Date- 11/24/2008 10:30:01 AM
Subject: Building Official Comments
e TEXT.htm
Jim,
We have not seen any emails come through on the Building Officials comments on latest information provided by
Bright Engineering. Coming today?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
file.//C \Documents and SettmgsJheath\Local Settings\Temp\messages.xml 4/21/2009
:f
I
November 21, 2008
Jim Malhum
Project Manager
Public Works and Utilities Department
City of Port Angeles
321 E Fifth St.
Port Angeles, WA 98362
Subject. STOP WORK NOTICE - Port Angeles International Gateway
Dear Mr Malhum.
As the City Building Official, I am directing this letter to you in your capacity as project
manager and applicant of the above mentioned project. Since September of this year,the
Building Division has been advising you and other project proponents of concerns
identified upon inspection of the Port Angeles International Gateway Facility
Despite multiple meetings, dedication of staff time, and hiring of an engineer, project
proponents have failed to fully address these concerns. I have attached a November 19,
2008 letter from Tracy Gudgel with Zenovic and Associates outlining these issues that
must be addressed. These issues were discussed at a meeting on October 9, 2008
attended by you and other project proponents and at that time it was agreed the requested
details would be provided, but, as of today have not been provided.
On September 12, 2008, the City Building Inspector directed that all work in relation to
loading of the plaza deck be discontinued as a result of structural issues identified upon
inspection. Due to the lack of response to date,please consider this letter your official
STOP WORK NOTICE regarding that portion of the project. You have been advised of
the corrective action that must be taken and it is reiterated in the attached letter I will
continue to make available to you options for removing the stop work order as outlined in
the attachment.
Monitoring as discussed at the October 9, 2008 meeting must be incorporated
immediately to ensure no further delays of the project. Please consider the monitoring
and associated analysis of monitoring results to be a requirement prior to any
consideration for occupancy
1
1 �
Please also be advised that due to the continued reviews of partial and incomplete
documents you and other proponents have submitted, review costs have exceeded review
fees submitted in conjunction with your building permit. As a result, all future reviews,
and correspondence associated with the project will be billed to you at cost.
Occupancy of this facility shall not be permitted until the City's Building Inspector
approved corrective actions have been implemented and a satisfactory response has been
provided that adequately addresses the structural integrity of the facility
Sincerely,
Nathan A. West, AICP
Director of Community and Economic Development
CC Glenn Cutler, Director of Public Works and Utilities, City of Port Angeles
Terry Weed, Clallam Transit System
Bright Engineering Inc.
Exeltech, Inc
Krei Architecture, Inc
2
ES
ov R,T" NkaE L
W A S H I N G TO N U S A
jMEMA Public Works & Utilities Department
November 21, 2008
Mr Terry Weed
General Manager
830 W Laundsen Blvd.
Port Angeles, WA 98363
RE International Gateway Project Partial Acceptance
Dear Terry,
r It is strongly recommended that partial acceptance of the subject project be pursued. In
particular acceptance of the sidewalks on Front, Lincoln and Railroad and the west parking
garage will provide the maximum benefit to the community for the holiday season.
At the November 13`h Principals Meeting, it was agreed that obtaining partial occupancy of
some of the project was a benefit to all parties and should be pursued.
As the Principal responsible for managing the Clallam Transit System contract, I am
requesting that you take appropriate action to accept the sidewalks and west parking garage
by Wednesday, November 26, 2008 Portions of the sidewalk are currently open to the
public It is realized that the west garage is dependent upon obtaining a certificate of
occupancy from the City Building Official.
The Callam Transit System contract with Primo Construction Section 9 9, Partial Occupancy
or Use, addresses the steps to be taken to accomplish this (see attached) City staff is
available to assist C1allam Transit System staff in developing the appropriate action
necessary to implement the process for partial acceptance
If you have any questions please contact Jim Mahlum, City Project Manager at 360-417-
4701 or e-mail tmahlum(ci.;citvo.fpa.us
d
Sincerely,
Cutler, P.E
Director of Public Works and Utilities
Attachment Section 9 9 Partial Occupancy or Use
Phone 360-417-4805/ Fax 360-417-4542
k Website wwwcityofpa.us/Email publicworks@cityofpa.us
321 East Fifth Street P 0 Box 1150 / Port Angeles WA 98362-0217
§9 6.4 Neither the Owner nor Architec shall have an obli`atton to pay or to see to the pa,mint of money to a
Subcontractor except as may otherwise be required'by law
§9 5.5 Payment to material suppliers shall be treated in a manner similar to that provided in Sections 9 6.' 9 6 3 and
9 6.�"
§9 6.6 A Certificate for Payment. a progress payment. or partial or entire use or occupancy of the Proje; t by the
Owne: shall not constitute acceptance of Work not in ac-ordance with the Contiact Documents.
§9 6.7 Lnless the Contractor provides the Owner with a payment bond in the full penal sum of the Contract SLUTI,
payments received by the Contractor for Work properly perforlmed by Subcontractors and suppliers shall.be held by
the Contractor for those Subcontractors or suppliers who performed Work or furnished mate-ials.or both under
contrac with the Contractor for which payment was made by the Owner Nothing contained herein shall require
mono to be placed in a separate account and not commingled with money of the Contractor shall create any
fidliCiary liability or tort liability on the part of the-Contracror for breach of trust or shall entitle any person or entity
to an award of punitive damages against the Contractor for breach of the -eauirements of this provision.
§9 7 FAILURE OF PAYMENT
§9 71 If the Architect does not issue a Certificate for Payment,through no.fault of the Contractor within seven d,ys
after receipt of rhe-Contractors Application for Payment,or if the Owner does not pay the Contractor within seven
days after the date established in the Contract Documents the amount certified by the Architect or awarded by
arbitration.then the Contractor may upon seven additional days written notice to the Owner and 4rehitect,stop the
Work until payment of the amount owing has been received.The Contract Time shall be extended appropriately and
the Contract Sum shall be increased by the-amount of the Contractors reasonable costsof shut-down,delay and
star-.-up plus interest as provided for in the Contract Documents.
§9,3 SUBS'ANTIAL COMPLETION
§9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof
i, sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the
Work for its intended use
§9,8,2 When the Contractor considers that the Work,or a portion thereof which the Owner agrees to accept
separately is substantially complete the Contractor shall prepare and submit to the Architect a comprehensive list of
items to be completed or corrected prior to final payment.Failure to include an item on such list does not alter the
rt:,ponsibiliiy of the Contractor to complete all Work in accordance with the Contrae Documents
§9,8,3 Lpon receipt of the Contractors list.the Architect will make an inspection to determine whether the Work or
designated portion thereof is substantially complete If the Architect's inspection discloses any item, whether or not
included on the Contractors list, which isnot sufficiently complete in accordance with the Contiact Document:, so
that the Owner can oceup-v or utilize the Work or design2ted portion thereof for its intended use, the Contractor
shall. betor issuance of the-Certificate of Substantial Completion,complete or correct such item upon notification
by the Ar,hi ,ct. in such case,the-Contractor shall then submit a request for anothe, inspection by the Architect to
determine Substantial Completion.
§9.8,4 When the Work or designated portion thereof.is substantially complete the 4rchiteut will prepare a
Certiticate of Substantial Completion which Shall es ablish the date of Substantial Completion, shall e.;tablish
responsibilities of the Ownei and Contractor for security maintenance, heat. utilities,damage to the Work and
insurance and shall fix the time within which the Contractor shall finish all items on the list accompanying the
Certificate Warranties required by the Contract Documents shall commence on the date of Substantial Completion
of the Vvor'c or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion.
§9 3.5 The Certificate of Substa..t.al Completion.shall be subm.tted to the Owner and Contractor for their written
acceptance of responsibilities assigned to them in such Certificate Lipon such acceptance and consent of surety if
an, the Owner shall make payment of retainage applying to such Work or designated portion thereof. Such payment
shall be adjusted for Work that is incomplete or not in accordance w,th the requirements of the Contract Documents.
§9,9 PARTIAL OCCUPANCY OR USE
§9 91 The Owner may occupy or use any completed or p:rtially completed portion of the Work at anv stage when
such pni-tion is designated by.separate agreement with the Contractor provided such occupancy or use is consented
AIA Document A201 —1997 Copyright d 1888,1911 1915,1918,1925 1937 1951 1958.1961 1963. 1966 1970,1976, 190"and 199-by
The.American Institute of Architects.All rights reserved.WARNING This AIAf Document is protected by U.S.Copyright Law and 23Inte-naticnai Treaties unauthorized reproduction or distribution of this AIA`;Document,or any portion of it,may result in se.,ere civil and
criminal penoltin and will ba prosecuted to the maximum extent p, sibie under the law Purchasers are not permitted to reproduce this
document.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel.copyright r@..aia org.
to by the Insurer as required undo, Section I 1 4 l �, and authorized by public authorities havtn,jurisdiction over the
Work. Such partial occupancy or use may commence whether or not the portion is substantially complete provided
the Owne, and Contractor have ac-epted in writing the responsibilities assigned to each of them for payments
retauta<-,e if any security maintenance heat utilities.damage to the Work and insurance, and have agreed in
writing concerning the period `or coir ction of the W ork and commencement of warranties required by the Contract
Documents When the Contractor considers a portion substantially complete the Contractor shall prepare and
submit a list to the Architect as provided Linde. Section 9 S 2.Consent of the Contractor to partial occupancy or use
shall not be unreasonablv withheld. The stage of the progress of the Work shall be determined by written agreement
between the Owner and Contractor or if no agreement is reached, by decision of the Architect.
§9.9.2 Immediately prior to such partial oceupancv or use the Owner Contractor and Architect shall jointly inspect
the area to be occupied or portion of the Work to be used in order to determine and record.the condition of the
Work.
§9.9 3 Cnless otherwise agreed upon, partial occupancy or use of a portion or portions of the Wort:shall not
constitute acceptance of Work not complying with the requirements of the Contract Documents
§9 10 FINAL COMPLETION AND FINAL PAYMENT
§9.10.1 Upon receipt of written notice that the Work is ready for final.inspection and acceptance and upon receipt of
a final Application for Payment, the krchitect will promptly make such inspection and, when the Architect finds the
Work acceptable under the Contract Documents and the Contract fully performed, the Architect will promptly issue
a final Certificate for Payment stating that to the best of the Architect's knowledge.information and belief, and on
the basis of.the Architect's on site visits ancLuhspeetions, the.Work has been completed.in accordance with terms and
conditions of the Contract Documents and that the entire balance found to be due the Contractnr.and noted in the
final Certificate is due and payable The krchitect's final Certificate for Payment will constittite.a further
representation that conditions listed in Section 9 10 2 as precedent to the Contractor's being entitled to final pavment
have been fulfilled. v
§9 10.2 Neither final payment nor any remaining retained percentage shall.become due until the Contractor submits
to the Architect(1)an affidavit that payrolls,bills for materials and equipment, and other indebtedness connected
with the Work for which the Owner or the Owner's property might be responsible or encumbered(less amounts
withheld by Owner) have been paid or otherwise.satisfied. (2) a Certificate evidencing that insurance required by the
Contract Documents to remain in force after final payment is currently in effect and will not be canceled or allowed
to expire until at least 30 days prior written notice has been given to the Owner (3)a written statement that the
Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by
the Contract Documents, (F)consent of surety if any to final payment and(5), if required by the Owner other data
establishing payment or satisfaction of obhgafions, such as receipts,releases and waivers of liens,claims security
interests or encumbrances arising out of the,Contract, to the extent and in such form as may be designated by the
Owner If a Subcontractor refuses to furnish a release or waiver required by the Owner the Contractor may furnish a
bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after
payments are made,the Contractor shall refund to the Owner all money that the Owner may be compelled to pav in
discharging.such lien,including all costs and reasonable attorneys'fees.
§9 10.3 If after Substantial Completion of the Work.final completion thereof is materially delayed through no fault
of the Contractor or by issuance of Change Orde•-s affecting Final completion. and the Architect so confirms the
Owner shall. upon application by the Contractor and certification by the Architect, and without terminating the
Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the
remaining balance for Work-not fully completed or corrected is less than retainage stipulated in the Contract.
Documents,and if bonds have been furnished, the written consent of surety to payment of the balance due for that
portion of the Work fully completed and accepted shall be submitted by the Contractor to the Architect prior to
certification of such payment. Such payment shall be made under terms and conditions governing final payment,
except that it shall not constitute a waiver of claims.
§9 10.4 The making of final payment shall constitute a waiver of Claims by the Owner except those arising from.
1 liens, Claims, security interests or encumbrances arising out of the Contract and unsettled.
.2 failure of the Work to comply with the requirements of the Contract Documents or
.3 terns of special warranties required by the Contract Documents,
AIA Document A201-M—1997 Copyright J 1883, 1911 1915, 1913,1925,1937 1961 1968, 196 196^ 1966.1970,1976, 1987 and 1997 oy
The Arnercan Institute of Architects.All rights reserved.W.,ARNING Tin AIA Document is protected by U.S.Copyright Law and 29
Internatirnat Treaties.Unauthorized aproducticn or dE fribution of:his AIA Document.or any portion of it,may result in severs civil and
crit mal p,nasties and will be prc<ecuted to the maximum axtent ipcsaible under the law Purchasers are not,permitted to reproduce this
document.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects legal counsel,copyright@a;a.org.
November 20, 2008
Jim Malhum ,q
Project Mana eg�r r�J b-�AA (0�J
321 E. Fifth St.
Port Angeles, WA 98362
Subject: Port Angeles International Gateway
�Tb (.--) c no t-A cc-
Dear Mr Malhum.
As the City Building Official, I am directing this letter to you in your capacity as project
manager and applicant of the above mentioned project. Since September of this year,the
Building Division of the Community and Economic Development Department has been
advising you and other project proponents of unaddressed concerns identified upon
inspection of the Port Angeles International Gateway Facility
Despite multiple meetings, dedication of staff time, and hiring of an engineer, project
proponents continue to avoid answering questions and have withheld the information my
staff have requested. I have attached a letter from Tracy Gudgel with Zenovic and
Associates, our contracted reviewing engineer, outlining those issues that must be
addressed. These issues were discusse a meeting attended by you and other project
proponents and at that time it was agree the requested details would be provided.
On September 12, 2008, the City Building Inspector r6quested that all work in relation to
loading of the plaza deck be discontinued as a resultlstructural issues identified upon
inspection. Due to the lack of response to date,please consider this letter your official
STOP WORK NOTICE regarding that portion of the project. You have been advised of
the corrective action that must be taken and it is reiterated in the attached letter I will
continue to make available to you options as outlined in the attachment.
Monitoring as discussed at the "October 9, 2008 delamination meeting must be
incorporated immediately to ensure no further delays of the project. Per the attached
letter, I will consider lifting the stop work notice should you proceed in accordance with
Mr Gudgel's November 6, 2008 letter
1
CML ENGTNEERING
EEN ( V.I C — __ _�_ LAND SURVEYING
ASSOCIATES �
EVE � E I V�� D 301 East 6th Street,Suite 1
MQ Port Angeles,Washmgton 98362
INCORPORATED NOV 192008
(360)417-0501
CITY OF PORT ANGELES Fax(360)417-0514
Dept.of CommYnit Dove ment I E-mail:zenovic@olympus.net
November 19 2008
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
I have reviewed the response letter from Ade Bright dated November 12, 2008 to my letter dated
November 6, 2008 which also references building inspector's letter and meeting notes/outline
notes of October 7 2008 His response letter still does not adequately address all the issues in
the outline, my letter dated November 19 2008 or the additional comments in the letter by Ingo
Goller of Exeltech dated October 20 2008 and is not acceptable to this office. It should also be
noted that Ade still does not appear to have all my comments in the outline and his response
shall include all my comments(I have included a copy of the outline with my additional notes
italicized). I will not provide a complete review of his letter but will highlight the following portions
as I did in my previous letter(see outline for item numbers):
Item 1 B ) It is noted that Ade has provided calculations showing that only 5' of bearing
is required to support dead plus superimposed dead load However details of
the actual buck out have not been provided and Ade has not addressed how
this buck may affect bearing at the end of the beam since the location of the
bearing has shifted due to the spalling
Item 1 D)Ade has clarified that the 5' bearing calculation is for dead loads only It should
be noted that any proposed repairs shall be review and approved prior to
implementation of the repairs or any live loading on the deck.
Item 2, C)Ade has at least partially addressed the possible cause of the cracks and
additional information is not requested
Item 3, A)The cause of the cracking has not been completely addressed. The cause of
the cracking should be predictable and addressable Ade was asked to
address the possibility that the, beam may not be post tensioned equally due to
friction losses and also bracing effects of the walls, especially the 45 degree
wall which is noted in my added comments to the outline which is again
attached Ade shall address the issue of whether the walls were included in
the design since they have an effect on the post tensioning and the transfer of
post tensioning forces Some of the post tensioning forces will be transferred
into the wall (from the beam and floor slab pulling on the top of the wall)and
transfer it elsewhere, reducing the effective post tensioning forces in PB#3 and
particularly PB#4 This would reduce the beam capacity increase deflection,
and make it more susceptible to cracking from shrinkage and other forces. It
would seam prudent to utilize the data from the actual structure, hopefully
documented in post tensioning logs to run an analysis of the structure based
on the actual field results
It should be noted that this office now has copies of the reviewed shop
drawings and calculations done by Fine Engineering. In reviewing them there
appears to be a design change between the beam profiles in the plans by Ade
and the plans by Fine Engineering. Ade s plans do not show PT tendon dead
Page 2,
November 19, 2008
Gateway Project
ends in PB4 or PB6 while the plans by Fine Engineering have dead ends. This
discrepancy shall be addressed. The calculations also appear to assume a
fixed center support which is not completely accurate since the center support
is actually a post tensioned beam running in the opposite direction; this beam
would have some flexibility and the effects should be addressed. It should also
be noted that the analysis of this structure seems to be based only on two
dimensional analysis that is not taking into consideration the complex variables
associated with the two way asymmetrical post tension system actually used
on the project.
As noted above, Ade shall provide a complete response to the items in the outline and should
provide calculations where necessary to justify his responses. Ade shall also respond to the
comments of the letter dated October 20 2008 by Ingo Goller of Exeltech that also contains
several items related to the design which may be possible causes of the spalling/delamination
and cracking.
This office also reviewed a letter dated November 10 2008 by PCS Structural Solutions
pertaining to the review of the proposed solution to address the delamination area under P63. At
this time, the proposed repair of the spalling is not approved and therefore this office will not
comment on the letter Prior to approval of the proposed delamination/spall repair calculations
shall be provided to justify the repair as well as specific details to provide proper bonding of the
repair to the exposed rebar in the spalled area. The proposed repair shall also consider the
possibility of cracking at the reentrant corners and supplemental reinforcing shall be provided to
resist this possible cracking. The proposed repair shall be capable of resisting both the required
bearing loads, which it would appear to do, and also address flexural stresses caused by the
horizontal forces from the continued restrained shortening of the post tensioned beams It should
be noted that the proposed epoxy dowels do not develop the complete strength in the rebar and
may be questionable. The proposed spall repair shall provide anchorage which is sized and
spaced to handle the appropriate shear friction and tension forces.
Also reviewed was a draft letter by Krei Architecture dated November 17 2008 which proposes a
change in the construction sequence with the delamination repair being performed prior to
placement of the final topping slab This sudden change in the proposed sequence shall be
addressed by Ade since all previous documentation recommends placement of the topping slab
first. It should be noted that if the delamination repair is performed first there may be loads
induced into the repair from the loading that would not occur if the delamination repair was
completed after placement of the topping slab The only portion of the repair work which is
acceptable to perform at this time is the proposed epoxy injection of the cracks, this work may
occur at any point in time.
The proposed abandonment of the monitoring of the PT structure prior to loading of the deck is
also not acceptable. Ade himself in previous documents,wanted monitoring to help determine
the cause of the cracking and therefore monitoring will be required prior to placement of the
topping slab
As stated in the previous letter the issues and conditions noted above must be addressed prior to
any final acceptance of any proposed structural repairs. Since at this time the proposed
delamination/spall repair plan is not acceptable, the conditions previously noted and noted again
below shall be met prior to allowing construction to continue with the placement of the topping
slab
1) Shoring under PB3 shall be provided to protect against catastrophic failure of the
structure prior to allowing placement of the topping slab This shoring shall be
designed by a structural engineer licensed in the State of Washington. The shoring
shall be designed in such a way to allowing the beam to move under the increased
Page 3,
November 19 2008
Gateway Project
dead loads created by the addition of the topping slab without affecting the load path
on the beam
2) A monitoring program shall be developed and approved to monitor the deflection in
the beam as it is loaded as well as monitor the cracks in P134 during loading by
placement of the topping slab
3) The monitoring program shall be developed by experts in the field and shall be
initiated prior to placement of the topping slab with ample time to develop a baseline
to account for movements due to temperature
Once items 1-3 have been adequately addressed, the contractor may place the final topping slab.
It again shall be noted if placement of the final topping slab does is completed under the
conditions noted above it does not constitute an approval of the previous issues or the additional
issues by PCS or Ingo which must be addressed prior to the approval of any proposed structural
repairs to address the spalling/delamination or cracking. Any proposed structural repairs,
including calculations, shall be submitted and approved prior to beginning any repair work.
Please be reminded that the building shall not be occupied until all design questions have been
answered and any required repairs have been designed approved, and completed to the
satisfaction of the City of Port Angeles Building Department.
Please call me if you have any questions on this matter
Sincerely
Tra udgel, P E.
Fc: JN 08091
a 4,
IODftY�
Zenovic&Associates,Incorporated Letter October 8,2008
Items to Address:
Item 1
A. Address adequate reinforcing to handle reduction in bearing from spalling.
Beam Bearing has shifted to the east due to spalling under the bearing seat Post
Tension anchor block out does not extend deep enough into beam to pose a shear
cracking risk. A detail shall be provided.
Detail to include how rebar terminates at end of beam.- Formatted:Font:Italic
B. Account for buck out at stressing end.
Ade Bnght indicated the calculations show the bearing is less then 5 inches
Tracy Gudeel was concerned about how the bock out for the stressmg cones figured in on
the bearma condition(drew sketch on board).Ade Bright and Ingo Goller indicated that
the bearine condition was full height on the back side of the wall Ade was willmg_to
show Tracy the actual details Ingo indicated they had construction photos to confirm
Ade to provide details. Formatted:Font:Italic
C. Calculations and sketch to show combination of buck out and spalling do not
compromise beam bearing.
D Clarify the ultimate dead load factory of safety requirement.
Ultimate dead load includes a 1.2 Load Factor The calculations for the ultimate
dead load included the dead loads and the live load.
I thought Ade said the calculation did not include the live load please vert Formatted:Font:Italic
Item 2:
A. Regarding cracking address reentrant corners considered in design.
Ade Bright considered the reentrant comer crack potential.
B. Was reinforcing added at reentrant comers to reduce cracking?
No reinforcing was added to mitigate the crack potential.
C. Address horizontal cracking,not just at comers.
Outline to 10-09-08 delamination meeting.doc 1 of 7
i
,Ade addressed the construction sequencing request by Primo-to-backfill the-wall, Formatted:Font:Not Bold
therefore a wall support system was designed The cracking is occurring at those Formatted:Indent:Left: 0.25^�
lines.
It was also noted by Stan Cruse that the wall was backfilled and then the sheet piling
was removed with large equipment api13 img more forces than just the soil pressure
Ingo Goller and Jim Mahlum noted that this was at the time in the drop in Lincoln
Street occurred.
.Ade is to address cause of cracks and address construction loading _ Formatted:Font:Italic
Horizontal cracking was generated at the drilled holes,during installation of
whalers to support the wall during backfilling.
D Does proper vertical reinforcing eliminate horizontal cracks.
Ade will check his design for adequacy and provide references to the calculations.
A monitoring plan will be developed to observe any possible movement.
Ade is to clarify what loads he designed wall for including active soil pressure_ Formatted:Font:Italic
E. Address 60 degree angle crack below PB3,not at reentrant corner
It will be reviewed in field.
Asked for his explanation of the cause of this crack while on-site.. - Formatted:Font:Italic
F Provide calculations to justify
As a part of the field review will also review construction practices and
sequences. A review of the calculations will be done and references given to this review
It was noted that sheet pile removal could be a factor.
Item 3-
A. Address cause of vertical cracks in PB4.
This was addressed in Ade's September 2 report. No cause identified.
,During site visit asked that Ade address the possibility that beam may not be post Formatted:Font:Italic
tensioned equally due to fi•iction losses and whether this could cause the cracking Based
on fact that Ade said that post tensioning design was performed by others(l believe the
company that did the post tensioning)the calculations for this post tensioning design
shall be provided. This shall include documentation showing that the desi n was
reviewed and approved by Ade prior to the post tensioning work The calucations shall
show that the walls were including in the analysis since Ade says that the walls are part
of the integral system of the post tensioning The calculations should also address the 45
degree wall intersectinz the east wall near PB3 showing that it was included in the post
tension design since it was a change to the project.
Outline to 10-09-08 delamination meeting.doc 2 of 7
B. Variables addressed needs to determine whether the structure is sound.
Consider installing strain gauges prior to loading PT Deck
It was my understanding that strain gauges were to be added-prior-to loading the Fammued:Font:Italic
deck. --
C. Provide calculations to show cause of crack.
Temperature reinforcing to be viewed for adequacy and references provided to the
calculations. 41so see comments of-item A_above- Formatted:Font:Italic
Item 4.
A. Cause of cracking does not appear to be complete.
Ade maintains that due to isolated delamination condition,Shear-friction is not a
problem.
B. Cause does not account for all the variables.
,pelaminationprobably caused by more than one issue,,possibly including minor Formatted:Font:Italic
sheen friction effects(
shear friction does occur when there is an interface between Formatted:Indent:Left: 0.5"
--------- ----------
concrete poured at two separate times) __ _ Formatted:Font:Italic
Formatted:Font:Italic
C. Cause related to the project issues.
D Cause related to post tensioning.
Item 5:
A. Structural engineer has no reservations for placing the topping slab and
pavers.
Ade recommends loading structure. Final approval to proceed,with loading the
deck structure,will be considered after a report addressing these issues is submitted and
accepted. Repair procedure to address delamination repair will be submitted prior to
making repairs.
Outline to 10-09-08 delamination meeting.doc 3 of 7
It shall be made clear that calculations will be required to iustif the proposed - ronnateee:Font:
analysis shallItalic
repair. The show that the repair will resist any tension loads on the inside
face where the Walling occurred for the life of the structure including any affects offing
term creep,post tensioning reforces4or loading, om seismic events ftmw eed:Font:Italic
Formatted:Font:Italic
First Paragraph after Item 5:
Previous discussion covered the following items.
The discussion ended at this point as all discussion in the above touched on each of the
remaining issues. Some short discussion shall briefly included to tie all these remaining
items to those discussed above
A. Engineer has not completely addressed items above.
B Therefore recommended that remaining dead loads not be imposed until items
addressed.
C. Reinforcing and post tensioning minimize and/or eliminate cracking in concrete.
Second Paragraph after Item 5:
A. Engineer may not have accounted for or considered several design issues.
B. Excessive cracking and spalling due may be partially due difference in rigidly
(assume rigidity)along east wall line.
C. Fact post tension forces are being transferred into wall.
Outline to 10-09-08 delamination meeting.doc 4 of 7
D At PB3 45 degree wall adds stiffness and likely wasn't considered in design.
E. Post tensioning forces are being transferred into wall and not staying in beam and
slab(assumed).
F Likely putting torsion effects on the wall on the non braced side.
G Torsion makes sense,based on the spalling pattern and cracks in the wall under
the beam.
H. Spalling decreases moving north,probably due to more flexible structure towards
the open end.
Third Paragraph after Item 5:
A. Appears shear friction may not have been addressed in design per ACI 318,
possible cause for spalling/delamination.
B. Reinforcing extending through the wall and into beam would exaggerate this
effect.
C. ACI attachments discusses shear friction and design,joints may carry significant
tension due to restrained shrinkage or thermal shortening.
Outline to 10-09-08 delamination meeting.doc 5 of 7
D Therefore wall restrained by 45 degree wall,post tensioning is causing similar
effect and creating significant tension at joint,thus spalling.
E. Concern thatrepair will not address this issue,before or after loading,tension will
remain at joint due to tensioning forces.
F Spalling will continue unless this issue is addressed.
G Future spalling would create additional issues,concrete pull out rather than break
at joint,between the grout and concrete.
Last Paragraph.
A. Engineer shall consider general comments noted above in response.
B. Include calculations for shear-friction forces.
C. Calculations shall justify grout repair is adequate without reinforcing,to address
the shear-friction forces.
Where do we go from here?
• Final report
• Final report shall include what monitoring it to occur during and after Formatted:Bullets and Numbering
loading
Outline to 10-09-08 delamination meeting.doc 6 of 7
• A draft copy will be provided to Exeltech for review and final
report will be provided to Nathan West,COPA Building Official,
with a copy to Exeltech.
• Acceptance of report
• Nathan West,COPA Building Official,will issue a notice to
proceed with loading the deck structure(placement of the concrete
topping). This notice shall include the requirement of design
acceptance of the final repair procedure to address delamination.
Outline to 10-09-08 delamination meeting.doc 7 of'7
_. ... _ _..._ ...._ ineerin. issue_. ._,a.M __,_.._..,,.....s�____,�...__ ______._..�.__
r(11�19 2008)William Bloor Re. Gateway-eng g Page 1
From. William Bloor
To: William Bloor
Date: 11/19/2008 11 52 AM
Subject: Re Gateway engineering issue
Synopsis:
City contracts with engineer to design building.
He does.
City contracts with construction company to erect building.
City's public works dept oversees construction.
City's Community development dept acts as building official.
Construction 3/4 complete. Load-bearing concrete columns begin to crumble. Problem appears to be in the design,not the
construction technique.
City building official stops work. Asks engineer for detailed report on problem and fixes.
Engineer does not respond.
City's interest is to have the project completed safely and with as little delay as possible.
City does not want to inadvertently release engineer from A&E liability
What can/should the city do? n
Recommended actions: cj 1
1. Building official notifies all parties that stop work order remains in effect until he has received from a qualified structural
engineer a thorough report on problem and recommended solutions.
2. City gives written notice to Krei and Primo project stopped,expenses will be incurred,delay in project completion,not the
city's fault,will hold both responsible. And, invite both to assist with measures to mitigate costs,expenses,delay N4h@��
stake-astieFycity will hire structural engineer and charge expenses to them.
3. City notifies Krei that it has a claim against it for A&E liability State that city is not waiving claim against Krei for liability but
City directs Krei to respond to building official as requested.
4 If Krei does not respond,City hires structural engineer to advise it. (Need good structural engineer).
5. In addition, ublic wor proposes to hire an independent structural engineer on whom all agree to report on problem and
possible solutions. ity wi I charge costs to responsible party City prefers that all parties agree to selection of independent
structural engineer and to act in accord with his report. (?If all do not agree to that, Public works will hire independent engineer?)
(Or take some other approach). (ADR in contract?)
6. Krei and/or Primo recommend solution.
7 Public works would direct contractor to implement solution identified by independent engineer
i
Page 1 of 5
Internet Message Novell
Properties
From: Stan Cruse <SCruseCparametrix.com>
To: Glenn Cutter- Jim Mahlum, Terry Weed, igoller@xltech.com
Cc: James Dugan
Date- 11/19/2008 11 14 44 AM
Subject: FTP Site
AOR TEXT.htm
All,
Jim s letter and supporting documents have be uploaded to the Parametrix Public FTP site In the Folder 11 18-08
Plaza Loading Letter under architectural.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com
file.//C \Documents and SettmgsJheath\Local Settings\Temp\messages.xml 4/21/2009
'ELES
R T
Or NG
Ai !
W A S H I N G T 0 N U S A
Public Works & Utilities Department
November 18 2008
James Dugan, Owners Representative Services Division Manager
Parametrix, Inc
2102 N Pearl Street, Suite 301
Tacoma, WA 98406
Re International Gateway Delamination Summary Letter
'k,
Dear Jim,
The Principal s meeting was very good last Thursday November 13 with a number of action items It
seemed all parties were focused on resolving the one major outstanding item, completion of the Plaza
Deck. On behalf of Krei Architects,you committed to memorializing direction, decisions and completing
research by the end of last week to ensure that when the Building Official s consultant returned from
vacation on Monday he would have all information available to complete his review This has not
happened.
Based on your 8.23pm November 17 email to me, I am extremely disappointed that I will not have Krei s
clarification letter until sometime on Wednesday,November 19 after being promised more than once I
would receive it on Monday In anticipation of receiving the Krei s letter on Monday I scheduled a
meeting for 9 AM Tuesday morning(today) with the Building Official, Building Inspector and Tracy
Gudgel to address the last two packages of information provided by Krei. Tracy was reviewing them all
Monday into the night, in preparation for today's discussions
Time is of the essence Please expedite the necessary reviews. I also request you seek consideration from
Bright Engineering concerning providing a method for construction completion that might permit
construction to be completed in a shorter timeframe than outlined in the last direction given. For
example, Bright Engineering may want to give consideration to placement of an angle iron support fixed
to the wall as a method of support under the beam, development of a plan for placement of the Plaza Deck
concrete in non-critical area, etc
The financial impacts are not known nor have they been presented by the contractor Primo Construction.
A prudent person would anticipate that added costs are being accrued, including costs associated with
additional construction management effort by Exeltech, and building permit inspection by the Building
r. Official and his consultant. It is imperative that resolution to this ongoing issue be resolved soonest.
I look forward to your timely response to these issues.
Sincerely
mes M. Mahlum, Project Manager
Nathan West, City Building Official
Clallam Transit
Exeltech
Phone 360-417-4805 / Fax 360-417-4542
Website wwwcityofpa.us/Email publicworks@cityofpa.us
321 East Fifth Street P 0 Box 1150 / Port Angeles WA 98362-0217
Page 8 of 22
Internet Message Novell.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: ab@brighteng.com; James Dugan, Robert Kugen, Ingo Goller
Cc: Jim Mahlum; 'Bill Alton 'Lindsay Murray 'Roger Horton Tom Ellis
Date- 11/17/2008 01 25 38 PM
Subject: RE. Items for your consideration!
LTEXT.htm
Ade
Apparently your answer on the ramp is not clear my email to you defined the concrete for the ramp at Front street,
moving west through the Pavilion and over the bridge ramp to the west to the Transit Mall, because it is a separate
color See drawing A0.01 the darker concrete/hatched area. Can this total length be covered with the topping slab
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com
From. Ingo Goiter [mailto•igotter@xttech.com]
Sent. Monday November 17 2008 1 19 PM
To: Stan Cruse- ab@brighteng.com; Robert Kugen, James Dugan
Cc: 'Roger Horton Tom Ellis 'Bill Alton Jmahtum@cityofpa.us, 'Lindsay Murray
Subject. RE. Items for your consideration!
Stan,
The question about installing the topping stab west of the ramp while delamination repair is being done has not been
answered. So is it acceptable to install the topping slab west of the ramp while the delamination work is in progress?
Ingo Gotter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igotler@xttech com<mailto igoller@xltech.com>
Ph. 360.417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exettech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
From Stan Cruse
Sent. Mon 11/17/2008 11 13 AM
To ab@brighteng.com, 'Ingo Goller' Robert Kugen, James Dugan
Cc: 'Roger Horton 'Tom Ellis 'Bill Alton Jmahlum@cityofpa.us; 'Lindsay Murray
Subject: RE. Items for your consideration!
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 9 of 22
Ingo,
Any additional questions?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710.6425
scruse@parametrix.com
From ab@brighteng.com [mailto.abCbrighteng.com]
Sent: Monday November 17 2008 11 12 AM
To: 'Ingo Goller' Stan Cruse Robert Kugen, James Dugan
Cc: 'Roger Horton 'Tom Ellis 'Bill Alton Jmahlum@cityofpa.us; 'Lindsay Murray
Subject: RE. Items for your consideration!
Ingo,
High early would require about half the time Its ok to place concrete for ramp.
Ade Bright, PE, SE
Bright Engineering, Inc.
From Ingo Goller [mailto igol[er@xltech.com]
Sent. Monday November 17 2008 10:49 AM
To Stan Cruse [scruse@parametrix.com] rkugen@parametrix.com; jduganCparametrix.com
Cc: ab@brighteng.com; Roger Horton Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject. Items for your consideration!
Stan,
As discussed with Jim this morning I would like your input on the possibility to allow the construction of the ramp
across the PT deck from Front Street to the north end of the bridge and install the topping slab to the west of the
ramp. During the time that this portion of the topping slab is being installed the delamination repair is being
completed and allowed to cure the required time to achieve the necessary concrete maturity
Speaking of concrete maturity using a concrete with Type I / II cement will require 14 days to achieve a level of
maturity to develop concrete flexural capacity If a Type III cement is used what is the necessary cure period to
develop sufficient flexural capacity?
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech.com<mailto igoller@xltech com>
Ph 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this a-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 12 of 22
Internet Message Novell.
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: ab@brighteng.com; James Dugan, Robert Kugen, 'Ingo Goller'
Cc: Jim Mahlum; 'Bill Alton 'Lindsay Murray 'Roger Horton 'Tom Ellis
Date* 11/17/2008 11 13.02 AM
Subject: RE. Items for your consideration!
log 617
TEXT.htm
Ingo,
Any additional questions?
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360.710 6425
scruse@parametrix.com
From. ab@brighteng.com [mailto ab@brighteng.com]
Sent: Monday November 17 2008 11 12 AM
To. 'Ingo Goller' Stan Cruse- Robert Kugen, James Dugan
Cc: 'Roger Horton Tom Ellis 'Bill Alton Jmahlum@cityofpa.us; 'Lindsay Murray
Subject. RE. Items for your consideration!
Ingo,
High early would require about half the time Its ok to place concrete for ramp
Ade Bright, PE, SE
Bright Engineering, Inc.
From: Ingo Goller [mailto•igol[er@xltech.com]
Sent: Monday November 17 2008 1049 AM
To: Stan Cruse [scruse@parametrix.com] rkugen@parametrix.com, jdugan@parametrix.com
Cc: ab@brighteng.com, Roger Horton, Tom Ellis, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us] Lindsay Murray
Subject: Items for your consideration!
Stan,
As discussed with Jim this morning I would like your input on the possibility to allow the construction of the ramp
across the PT deck from Front Street to the north end of the bridge and install the topping slab to the west of the
ramp During the time that this portion of the topping slab is being installed the delamination repair is being
completed and allowed to cure the required time to achieve the necessary concrete maturity
Speaking of concrete maturity using a concrete with Type I / II cement will require 14 days to achieve a level of
maturity to develop concrete flexural capacity If a Type III cement is used what is the necessary cure period to
develop sufficient flexural capacity?
Ingo Gotter PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igotler@xltech com<mailto.igoller@xltech.com>
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 13 of 22
r
Ph. 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World People Not Companies, Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc.
Reuse of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc. shall
not be held responsible for any and all losses, claims or liabilities associated with the unauthorized use
interpretation or modification of the files or text.
file.//C \Documents and Settings\heath\Local Settings\Temp\messages.xml 4/21/2009
Page 14 of 22
Internet Message NoVeIL
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Jim Mahlum
Cc: James Dugan, Robert Kugen Susan Smith, igoller@xltech.com
Date- 11/17/2008 11 10:56 AM
Subject: RE. A/E Punchlisting
Jim and Ingo,
We are scheduled for Wednesday the 26th of November Unless directed otherwise we will be gather on site at the
Transit Building at 9.30 AM. Ingo we will assume you will have all the necessary punchlist forms for us to fill out.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v.2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
-Original Message-
From James Dugan
Sent: Monday November 17 2008 10.26 AM
To Jim Mahlum
Cc: igoller@xltech com, Stan Cruse
Subject. A/E Punchlisting
Jim Thx. We have asked our consultants to tell us which of the following three days is available and/or best:
Friday Nov 21
Tuesday Nov 25
Wednesday Nov 26
We will pick one of them. Back as soon as we hear from them.
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253 278.8105
jdugan@parametrix.com
-Original Message-
From: Jim Mahlum [mailto.Jmahlum@cityofpa.us]
Sent: Monday November 17 2008 10:20 AM
To: James Dugan
Cc: tweed@clallamtransit.com, igoller@xltech.com
Subject: RE. KA Letter with Attachments
Jim
As I see it all other days are good for us. jim
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 15 of 22
>>> James Dugan <JDugan@parametrix.com> 11/17/2008 8:06 AM>>>
So if Friday the 21st does not work for the consultants (won't know
for a few hours) please advise what other days are available
BTW Good luck with the DRB meeting.
Parametrix
inspired people inspired solutions making a difference
Jim Dugan
Owners Representative Services
Division Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 253 278.8105
jdugan@parametrix.com
-Original Message-
From. Jim Mahtum [mailto:Jmahlum@cityofpa.us]
Sent: Monday November 17 2008 8.05 AM
To: James Dugan
Cc: tweed@clallamtransit.com, igoller@xltech.com
Subject: Re KA Letter with Attachments
Jim,
Monday the 24th is not good for either Ingo or I as we both have a DRB
meeting that day for the 8th Street Bridge project.
Jim
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
Page 2 of 6
r
Internet Message NovelL
Properties
From: Stan Cruse <SCruse@parametrix.com>
To: Jim Mahlum, James Dugan
Cc: AdeBright, Glenn Cutler- Steve Sperr• igoller@xltech.com, 'Rod Finkle Roger Horton
Date- 11/13/2008 09.09.18 AM
Subject: RE. Response to Letter and Delamination Fix
Jim,
We have photos that show the Contractor had removed the concrete before Ade was on site to review
This is constructible do you need to hire another Contractor with experience?
It is the Contractors responsibility to insure that the concrete reaches all areas of the form, done commonly by ports,
etc. this not the designers responsibility You are wasting time instruct the Contractor to proceed We heard some
of the same talk during the underpinning and it got done
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710 6425
scruse@parametrix.com
-Original Message-
From: Jim Mahlum [mailto.Jmahlum@cityofpa.us]
Sent: Thursday November 13 2008 9.00 AM
To James Dugan, Stan Cruse
Cc: Bright Engineering; Glenn Cutler- Steve Sperr• igoller@xltech com; 'Rod Finkle Roger Horton
Subject. RE. Response to Letter and Delamination Fix
Stan
Your reply is unsatisfactory and in error The spatting section was removed NOT in an aggressive manner but was a
prudent measure under the direction of Ade Bright in order to determine the magnitude of the spall and reduced
bearing area.
Regarding the constructability of a design, it is the designers responsibility to design something that can actually be
built. We have some doubts of how one would get the concrete consolidated at the bottom and middle with so much
rebar nails, and only 6 space running almost to the top. To what extent do you believe and can be assured, that
there will be no air pockets?This should, and is, the responsibility of the designer
Jim
>>> Stan Cruse <SCruse@parametrix.com> 11/12/2008 5 17 PM>>>
Jim,
The shoring issue was never resolved and the engineer of record does not recommend. Now that there is a fix in place
to add back the bearing that was agresively removed by the Contractor under the direction and observation of
exeltech, there is no need for shoring.
Regarding constructability we need clarification, we are not responsible for means and methods by the Contractor If
the concern is forming we can probably brainstorm with the Contractor how to support, but that is usually designed
by them as required by the specifications.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse
Corporate Architect
phone- 360 850.5313
fax: 360 479 5961
scruse@parametrix.com
file.//C \Documents and Settings\jheath\Local Settmgs\Temp\messages.xml 4/21/2009
Page 3 of 6
From Jim Mahlum [Jmahlum@cityofpa.us)
` Sent. Wednesday November 12, 2008 4 52 PM
To: James Dugan, Stan Cruse
Cc: Glenn Cutter- Steve Sperr• igoller@xltech.com; 'Rod Finkle Roger Horton
Subject. Re- Response to Letter and Delamination Fix
Stan li Jim
I have forwarded these on to the Building Official-for review and
comments. After reviewing our review (Glenn, Steve and myself) we do
not see any documentation as to providing a shoring system to load the
deck, as we were lead to believe in our phone conversation with you last
week.
This question has been put out there and you have had discussions with
Exeltech concerning this interim measure Does this require a shoring
system, YES or No. If it does not please explain. If it does please
provide an engineered drawing AND CALCULATIONS.
We also like further discussion as to the constructability of the
permanent fix as it does not appear obvious to us.
Please be able to explain tomorrow at our meeting.
Jim
>>> Stan Cruse <SCruse@parametrix.com> 11/10/2008 3 55 PM >>>
Jim,
Attached are five items:
1 The revised September 30 2008 letter from Bright Engineering which
revises item 3 third sentence does not fit flexural or shear
cracks
2. Letter dated October 28, 2008 which addresses all items of the
original meeting.
3 Calculations dated November 7 2008 which supports the October 28
letter
4 Drawing showing the proposed delamination fix dated November 7
2008.
5 PCS letter providing review comments on the fix design.
Please call if you have any questions.
Parametrix
inspired people inspired solutions making a difference
Stanley C. Cruse AIA, LEED v 2 AP
Project Manager
phone- 253 752.9862
fax: 253 752.9865
cell. 360 710.6425
scruse@parametrix.com
file.//C \Documents and Settings\jheath\Local Settings\Temp\messages.xml 4/21/2009
O L��
E I
AN
Wlop, .._ WASHINGTON U S A
PUBLIC WORKS & UTILITIES DEPARTMENT
Date- November 12, 2008
To Nathan West, Director of Community Development c O
From Jim Mahlum, Civil Engin
v4�oeNc
Subject: Gateway Project—Krei s le of response to delamination issue
Attached are five items responding to the delamination issue
1 The revised September 30, 2008 letter from Bright Engineering which revises item 3, third
sentence, " does not fit flexural or shear cracks
2. Letter dated October 28, 2008 which addresses items of the original meeting.
3 Calculations dated November 7, 2008,which supports the October 28, letter
4 Drawing showing the proposed delammation fix dated November 7, 2008
5 PCS letter providing review comments on the fix design.
CC Exeltech
Clallam Transit
Glenn Cutler, Director of Public Works and Utilities
Steve Sperr City Engineer
N\PROJECTS\97 20 Gateway\26 Claims&Liens\delamination 11-07-08 letter forwarded to CED.doc
'j POR
T NGELES
j ' '7 •
W A .S H I N G T O N U S A.
Community & Economic Development Department
y
November 12, 2008
Mr Glenn Cutler, Director
Public Works &Utilities
r P O Box 1150
Port Angeles, WA 98362
'- RE Engineering Fees - Gateway Project
Dear Glenn.
As the applicant of record for the City's Gateway project, the attached billing from Zenovic
fi and.Associates is being referred to you for payment. These extraordinary costs were not
anticipated as part of the building permit fee. It was necessary for this Department to
' independently seek engineering consultation due to the engineer of record being
unresponsive when asked for specific information needed to address engineering concerns
>3 noted by the City's Building Inspector in review of the project (Building Permits #07-742
and 07-1.042) Costs continue to be incurred for this reason, and may continue to be incurred
until a resolution has been reached and the uested with the engineer responds as re
g P q
n subordinating information.
�., Thank you for your attention to this matter
B t
" v Sincerely,
Sue Roberds
Planning Manager
' r
Attachment: October 31 2008 billing from Zenovic and Associates
' . cc Jim Mahlum,Project Engineer
„�✓., 44
YIN•' ' t"YAP
°-V
a;% �- dart xw'•'�'�_
2,
Phone 360-417-4750/ Fax 360-417-4711
Website wwwcityofpa.us/Email smartarowth@cityofpa.us
2 `f. 321 East Fitch Street PO Box 1150/Port/;ngeles WA 98362-0217
5a 73,
i-4
i�"' N
�Q_Vq ,GVEER1NG ,,
3�' V'v
'�V
ZMA&A,
TAN Q WRY)-MY N G'
NKI
301 East 6th Street,Suite I
& ASSOCIATES
Port Angeles,Washington 98362
I N C 0 R j, b R A T E D
(360)417-0501
Invoice Fax(360)417-0514
E-mail:zenovic@olympus.net
D
g
City of Port Angeles NOY 4 2008
Invoice 8103
P 0 Box 1150 City of Port Angeles
Port An
WA 98362 eublic Works and Utilities Dept Invoice Date 10/31/2008
EngmeenngServicesDivislut Due Date 11/30/2008
Terms. 2% discount if paid by 15th
Project: 08091 - Plan Reviews You may take discount at time of payment
Services provided for the period of September 27 2008 through October 25 2008
Phase Description Hours/Qty Rate Amount
GATEWAY
Structural Analysis Senior Design Engineer- Plan Review 12 10000 1 20000
Structural Analysis Senior Design Engineer- Specifications 05 10000 5000
Structural Analysis Senior Design Engineer- Meeting 4 10000 40000
Representation
Structural Analysis Senior Design Engineer- Documentation 1 5 10000 15000
'f�1 v
Accounts delinquent after 30 days Invoice Total $1 80000
1% Finance Charge applied to delinquent accounts
Costs advanced for which we have not yet been billed (such as Prepayments $000
service fees shipping. charges etc ) may not appear on this invoice
and will be billed at a later date
Balance Due $1 80000
r
'Aright C—nginee-ring Inc Consulting Structural and Civil Engineering
November 12, 2008 BEI# 116 03R
Parametnx, Inc.
Attn. Stan Cruse,Project Manager
2102 N Pearl Street, Suite 301
Tacoma, WA 98406 O
RE. PORT ANGELES INTERNATIONAL GATEWAY o,,V
Response to Zenovic&Associates, Inc. �u� 13 l
D Cir),
eAt.Of Co
NGF
Dear Stan o SFS
'°mons
Our response to letter dated November 6, 2008 from Zenovic &Associates, Inc. is as fol ows.
Item 1 B.
We have provided calculations to show that an average of 5"deep.bearing is all that is necessary to
support dead plus superimposed dead load. Our initial proposal was to make the repair after that,
and at which time the bearing width would have been filled to at least 12",the thickness of the wall
for any added loads.No further calculation will be provided.
Item 1 D.
In my letter dated September 30, 2000, I indicated the magnitude of dead and live load reaction for
P133 at the east wall I also stated that under ultimate dead load (which includes contribution of
loading the deck), approximately 5" bearing depth is required. This is consistent with our response
of October 28.and the calculation submitted November 7a'
As stated above,we are not concerned about live load effects for the existing bearing condition
simply because full bearing depth would be in place prior to the application of live load. There is no
calculation for proposed repair since the bearing area after the repair is more than adequate. Repair is
based on our professional judgment,
Item 2C.
We cannot comment on the effect of construction loads on the cracks because we were not present at
the site for observation.
Our letter of October 28'h included photographs and statements from October 7'h meeting related to
significant ground settlement when sheet piles along the east walls were being removed. We and
Landau Associates have also noted in previous reports significant ground vibration while the sheet
piles were being removed
Noting that the crack is almost in line with the waler, among the factors we have mentioned it is
conceivable that in may be induced by the vibration. Again,we cannot conclusively claim a
Mr Stan Cruse,AIA,LEEDv.2 AP
November 12,2008
Page 2 of 2
particular cause for the crack as Zenovic is requesting. In our opinion, the location of the honzontal
crack does not compromise the structural integrity of the wall.
Item 3A.
Agam,we have addressed the issue of these cracks to the best of our knowledge. We have also
attached copies of reviewed shop drawings which we believe the COPA has copies of. Zenovic
should note that we only review shop drawings and not approve them.
We have reviewed our work and are satisfied with the design. However, we can only comment on
and not draw absolute conclusions to the effects of material,means and method ofconstruction,
matenals placement and their conformance to design drawings. If Zenovic&Associates has done
some calculations or has expertise or experience in these matters, we would like them to share it with
us,because their persistent requests in view of our responses suggest so
Deck Superimposed Dead Load.
As noted on page 5-001 of previous submitted calculation, dead load is 94 psf, superimposed dead
load is 52 psf. Total dead load is 146 psf,but rounded up to 150 psf for which the PT was
proportioned. It is for this reason we have persisted on loading the deck so as to balance the stresses
in the plaza deck.
Our only contact with PCS with respect to this project was on Monday of this week to discuss their
expenence with our initial sketch of the proposed fix. We do not know what material they were
provided for their review and cannot comment on the scope of their work.
Zenovic's Conditions for Loading:
With respect to the conditions placed on loading the plaza, we can only comment on Item#1 We
elect to do the repair pnor to loading the structure since it is our opinion that there is no benefit to
the proposed shoring method. We have consistently maintained that the plaza can be loaded without
the repair With respect to items 2 and 3 we would defer them for future discussion with Parametrix
and the COPA.
Finally, with respect to comments regarding PCS independent review and responses we have
provided thus far,Zenovic's comments, without the benefit of any calculations or assessment, is
unprofessional We will limit our responses only to those comments that have technical validity
Please call me if you have any questions.
Best regards,
Y
s
Aic J 13 ht, PD;8
41
301 East 6th Street,Suite I
& ASSOCIATES Port AngeirsWashington 98362
Fax(360)417-0514
E-mail:onovic@mympus.met
November O. 2OD8
MrJim Liedy RECEIVED
8ui|d/ng !nmpeuhor
City ofPort Angeles Department ofCommunity Development
321 East Fifth Street NOV, 0 7 2008
Port Angeles,VVA88382
CITY OF PORT ANGELES
SUBJECT Port Angeles International Gateway BUILDING DIVISION '
Dear Mr Liedy'
1hovonoviemedthanmaponoe|ettarfromAdm8rightdobod [%ctobor28. 2OO8concenningbui|ding
Inspector's letter and meeting notes/outline notes ofOctober 7 2008. His response letter does
not adequately address all the issues in the outline and is not acceptable to this office. It should
be noted that Ade does not appear to have all my comments in the outline and he should include
all my comments in his response. I will not provide a complete review of his letter but will
highlight the following portions (see outline for item nunnbero):
Item 1. B.\ Details not provided tuclarify Issue ofbearing with reduction inwall width to
8' due tompaUing.
Item |nmeeting Ade appeared toindicate that loads donot include live loads
Item 2. 0Cause ofcracks and construction loads not completely addressed.
Item 3./QReason for cracks tobaaddressed Ade boaddress this issue and comment
that design was performed byothers. Provide his approval and review ofthe
design, including shop dnavvnQa.and structural calculations.
Ade should provide a complete response to the items in the outline and should provide
calculations where necessary tojustify his responses.
Also reviewed atthis time imoletter dated October 2O 2D08byIngo GoUarofEne|tenhwhich
agrees with my opinion that Ade has not completely and specifically addressed the issues noted
|nthe outline. Ingo'o letter also contains several items related tothe design which may be
possible causes of the spalling/delam!nation and cracking that must also be addressed by Bright
Engineering aopart ofhis response.
Athird letter b PCS Structural Solutions was also reviewed bythis ofOce.This letter does
discuss possible causes of the various cracking but appears to be only a cursory review as is
noted inthe letter |tdoes bring upadiscrepancy concerning the actual superimposed dead load
onthe structure. |t|onoted that Ade used a1S0pofsuperimposed dead load onthe deck while
PCS Indicates a 50 psf superimposed dead load more accurately represents the loading on the
deck. This discrepancy shall beaddressed byAde including what affect this would have onthe
design of the structure since the dead load is less than he figured and thus would affect the
camber inthe PTbeams and what PTload was specified inthe design. |tshall banoted that the
letter from PCS ianot considered bythis office bobeonindependent third party review ofthe
design and ioonly cursory innature.
The issues noted above must be addressed prior to final acceptance of any proposed structural
repairs. That said, this office is willing to allow construction activities to continue with the
placement of the topping slab to complete loading of the deck provided the following conditions
are met:
Page 2,
November 6, 2008
Gateway Project
1) Shoring under P133 shall be provided to protect against catastrophic failure of the
structure prior to allowing placement of the topping slab. This shoring shall be
designed by a structural engineer licensed in the State of Washington The shoring
shall be designed in such a way to allowing the beam to move under the increased
dead loads created by the addition of the topping slab without affecting the load path
on the beam.
2) A monitoring program shall be developed and approved to monitor the deflection in
the beam as it is loaded as well as monitor the cracks in PB4 during loading by
placement of the topping slab
3) The monitoring program shall be developed by experts in the field and shall be
initiated prior to placement of the topping slab with ample time to develop a baseline
to account for movements due to temperature.
Once items 1-3 have been adequately addressed, the contractor may place the final,topping slab
It shall be noted that placement of the final topping slab does not constitute an approval of the
previous issues or the additional issues by PCS or Ingo which must be addressed prior to the
approval of any proposed structural repairs to address the spalling/delamination or cracking. Any
proposed structural repairs shall be submitted and approved prior to beginning any repair work.
Please be reminded that the building shall not be occupied until all design questions have been
answered and any required repairs have been designed, approved, and completed to the
satisfaction of the City of PortAngeles Building Department.
Please call J
hav any questions on this matter
Sincerely
I
udg
Fc: JN 08091 01
1�1
?L.5
REGt��
i
� a
�1r7fid' r'
TABLE OF CONTENTS I I
i DEC 7907 �.
PORT ANGELES INTERNATIONAL GATEWAY !
BONDED BEAM CALCULATIONS ,_- ""---
SECTION TITLE/DESCRIPTION PAGE No.
TABLE OF CONTENTS
PT BEAM DATA V
Beam Layout Info. 1
Beam&Tendon Summary 2
PT Friction/Loss Calcs 3 to 23
PT Beam Data 24 to 25
PT Beam Anchorage Reinforcing 26 to 27
No UCAITIIN ,T"Er MAKE CL RRECTKINS NOT68
p f "
RMCTED REVISE AND RESUBMIT E�
SUBMIT SPECIFIED ITEM 73
CHECKING IS ONLY FOR GCNERI. ;,fjrr.l>MANCE 'iTH THE DESIGN
CONCEPT OF THE PROJEr, „t r, E"7EI+11. Co. PLIANCE WITH THE
IHFOFIMATIDIJ GIVEN IN rn,- C, AC AIA a0r'04
SHOWN IS SL78JECT T�) iHF tHr ;:LA. -, t�Xl
SPECIFICATION'S CONT' A" IOR ,_ PJNSIBLL FCR 0)"X y.-ON,
wHICH 5HALL BE CONFI& _0 A:L CORhc ATc'D AT THE ibeiT$
FABRICATIGN PROCE,,SES AND IELH;41OLE5 OF CONSr:JUC'fON
COOMNATION OF THIS Kr0!?x'Ni I T.iAT OF ALL OTHER TRADES AND
'1KSATISFACTORY PERFORMANCE OF CONTRACTORS WORK.
.1N 07007 wt
"Off ENGINEERING INC
PAGE >
M
e� Q
1
3�
23,159
ISTD,
ONAL
EXPIRES 12/26/20OJ5
Fac- 1V6 Eoi�cf CALC-ULATID4S
netca `7Zg gavf k3eaAl _
r2� g
6-3!7"
32" ,��� . 2 az
I(PV:t = 12©" 3ox f8 f 12oC7�f�
.P 7,/ X85 per'
A =
as fl
Spall 10( = - _gt5,3 =O.-Or j i ra Ids -' O
61;1 /-1
S�a� 2 -fay 1G 3�j` X659 = 0.0 675 Ybd �r (1 los )
r
PB —111 !2 13
T144
D S ,.3
35.E Q-s- - Zg 28
'�// i
uati, J 7.O.S (o s.
+Qi
8 = to OM D= 4'6� 1-/4 ^- 33.OAX 12 = !oI
.- : 11 � p s s'
WA 4 4navti t f219 6$0 p,tr
L.
Cp Job No.
asWby me C�ngineenng o
750977th DdweSE Snohomish.WA 98290
Webshe:www.tineenslnecrinG.Lom
Cffdby , Fax(360)568-6696
PART 44,CLC 7�-*AAIN C—'1"� Office(360)568.6695
TWO5FAN AMS
GIRDER FFECTIVE TENDON LMVOF NO.CF L%T9OF NO OF JAGKM �z 20% 0 100 10'�° ANCHOR
FORCE NUIM MLWW ML151W MOND MOM (K) Mao MLr MLTI PUTI TYPE
PS-344 666 1 I29 18 -- 1% 2° B° 10° i° EC6-19
PB-344 444 2 i 18 2 '� -- -- 52'1 -- 11/4° 43/40 6° P/a° EC6-IZ
M-344 444 3 18 12 -- -- 521 11/40 43/40 60 P/4o Ea-U
PB-546 611 1 18 151 191 -- 11/41 44o bo P/4° ECb-19
PB-546 440 2 121 -• -- 521 -- Z° 8° 10n 1° EC6-U
PS-516 440 3 US 121 521 -- 20 $o �° I° EC6-11'
3-5At6A 691 I 129 I9 -- -- 835 -- 28 S° 10° *211 ECb-19
3-5A46A 333 395 -- 29 8° 10° 3/4° EC6-12
PB-148 684 1 129 IS •- 191 -- 2u So 10o No EC6-19
3-1A48A 456 1 'U US I1 -- -- 521 -- 20 60 10° 14° ECb-t?
3-1A16A 456 2 U9 11 -- -- 521 -- 2° S° 10° ley° ECb-12
PB-9410 684 1 X19 Is -- -- 191 -- 2H ON 10° i41 ECb-19
5-11, 12413 1238 14 4 101 36 -- 191 6b° 1lb0 0 4XECb-19
'8-11 4 t2 168 2 4 3 56 2Z -- -- 483 -- 3/40 AN Aso 0 2XEC-642
00,6 SEE BEAM ELEVATIONS
N
3`INE
Li�iC•I:I N'�'•�'-3�I•NCS
7509 77th Drive sS
S HOBOM 18H•.STASHING TOR
98290
FREL ON G
FR I CT I G1N / EXaar4C3A9rI C>14 PRC>C3RAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
PROJECT : ORT ANGLES - TRANS CENTER 12-04-2007
STRIP I.D TYP TWO SPAN BEAM
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY - 28500 XSI Fu = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG 'BERM LOSSES = 10 07 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS = 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RAS
AVERAGE INITIAL TENDON STRESS = 185 36 KSI OR = 68 % Fu
.AVMRAGE FINAL TENDON .STRESS = 175 29 KSI = 38 0 FLIPS OR = 64 % Fu
TOTAL TENDON ELONGATION = 9 74 INCHES
.AVERAGE TENDON ELONGATION = 078 LNCHES PER FOOT
SPAN, SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
----- --------
1 61 67 0 32623 - 0.6910 32 00 6 50 41 50
2 63- -
08 031897 _-06750 41 50 6 50 32 00
-
TOTALS 124 75 0 64520 - 13660
PAGE 1
1
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D TYP TWO SPAN BEAM
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSi
CONCRETE STRENGTH a STRESSING f'oi = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f'c = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO V/S = 6 14 INCHES
TIME BETWEEN- MOIST CURE & STRESSING = 5 DAYS
P/A IN •THIS STRIP F/A = 0 285 KSI
RELATIVE HUMIDITY RH = 80 %
FOR!-IDLAS USED (ESTIMATING PRESTRESS LOSSES, C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ec = 57 (1000 f't )112
ELASTIC SHORTENING
ES = Koc (P/A) (E/Eci )
CREEP
CR = Kcr (P/A) (E/Ec )
SHRINKAGE
SH = 8 2 x 10-6 KahE(1 - 0 06(V./S)) (100 - RH)
RELAXATION
RE = (Kr o - its (ES + CR +. SH) Cr 4,
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
K•o = 0 5 FOR POST-TENSIONED MEMBERS
Kor = 1 6 FOR POST-TENSIONED MEMBERS
KAp = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kro = 5 0 KSI FOR 270 tGRADE LOW RELAXATION STRAND
Jso = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cr• = 0 70 FOR LOW RELAXATION STRAND @ 69% Fu
RESOLTS
ELASTIC SHORTENING = 1 13 KSI
CREEP = 3 .22 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 33 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 10 07 RSI
PAGE 2
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D TYP TWO SPAN BEAM
SPAN SPAN SPAN ADD'L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
1 61 67 0 32623 - 06910 181 6 186 9 190-0
2 63 08 O 31897 - 06750 190 0 183 2 178 4
TOTAL 124 75
X - 52 895 FEET STRESS LOSS AT SEATING = 20 94 KSI
PEAK STRESS = 192 0 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 61 67 O 25713 202 5 197 1 190 O
2 63 08 0 25147 190 O 183 2 178 4
- PAGE 3
P`IZNE
EN<3 1mEL�t I N G
7509 7.7th Drive SE
SNOHOMISH WASHINGTON
98290
FREI`,ONG
1�'R I CT I ON / ELiQ�i:GAT I CtN PROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-3/4 TWO SPAN
DA'T'A
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY = 28500 XSI F„ = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 XN-2
LONG TERM LOSSES 15 76 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS = 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RESULTS
AVERAGE INITIAL TENDON STRESS = 186 18 ASI OR = 68 $ Fu
AVERAGE FINAL TENDON STRESS = 170 42 KSI = 37 0 KIPS OR = 63 $ Fu
TOTAL TENDON ELONGATION = 9 78 INCHES
AVERAGE TENDON ELONGATION = 078 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 61 67 0 28314 - 04739 24 00 6 50 41 50
2 63 08 0 31897 - 06750 41 50 6 50 32 00
TOTALS 124 75 0 60211 - 11489
PAGE 1 -
l0
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-3/4 TWO SPAN
LONG TERM LOSS CALCULATIONS
ARTA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f 'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f 'c = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO V/S = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE HUMIDITY RH = 80 %
FORMULAS USED (ESTIMATING PRESTRESS LOSSES C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
E. = 57 (1000 f'� )1/2
ELASTIC -SHORTENING
ES = Ke e (P/A) (E/E.1 )
CREEP
CR = Kor (P/A) (E/E. )
SHRINKAGE
SH = 8 2 X 10-6 KshE(1 - 0 06(V/S)) (100 - RH)
RELAXATION
RE = (Kr• - Jr. (ES + CR + SH) Cr.
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
K•o = 0 5 FOR POST-TENSIONED MEMBERS
Kc r = 1 6 FOR POST-TENSIONED .MEMBERS
Keh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kre = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jre = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cr• = 0 72 FOR LOW RELAXATION STRAND @ 69$ Fu
RESULTS
ELASTIC SHORTENING = 2 62 KSI
CREEP = 7 .51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 23 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 76 KSI
- PAGE 2 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D. = PS-3/4 TWO SPAN
SPAN SPAN SPAN ADD'L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
V
1 61 67 0 28314 - 04739 183 2 1873 190 8
2 63 08 0 31897 -_06750 190 8 184 0 179 2
TOTAL 124 75
X = 53 341 FEET STRESS LOSS AT SEATING = 19 27 KSI
PEAK STRESS = 192 9 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
-
1 61 67 O 23575 2025 198 4 190 8
2 63 08 0.25147 190 8 184 0 179, 2
- PAGE 3 -
F I N E
ENC3.I I NF=
75.09 77th Drive SE
SNOHOMISH WASHINGTON
98290
P'RELONG
Ei`R ICT 3t ON / EI,C3NGAT S-C7N PROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
PROJECT PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I D PB-5/6 TWO SPAN
DATA
CURVATURE COEFFICIENT D = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY = 2&500 KSI Fu = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 iN "2
LONG TERM LOSSES = 15 65 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RR OLTS
AVERAGE INITIAL TENDON STRESS = 184 75 KSI OR = 68 % Fu
AVERAGE FINAL TENDON STRESS = 169.11 KSI = 36 7 KIPS OR = 62 % Fu
TOTAL TENDON ELONGATION = 9 70 INCHES
AVERAGE TENDON ELONGATION = 078 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
-
1 61 67 0 35.847 - 08516 3800- `
6 50 41 50
2 63 08 0 31897 - 06750 41 50 6 50 32 00
TOTALS 124 75 0 67744 - 15266
PAGE 1 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-5/6 TWO SPAN
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f 'a; = 4 000 KSI
CONCRETE STRENGTH (28 DAY) Ve = 5 000 KSI
T-HEM VOLUME TO SURFACE RATIO V/S = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE- HUMIDITY RH = 80 %
FORMULAS USED (ESTIMATING PRESTRESS. LOSSES, C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
E. = 57 (1000 f . )1/2
ELASTIC SHORTENING
ES = Kes (P/A) (E/Ect )
CREEP
CR = Kcr (P/A) (E/Eo )
SHRINKAGE
SH = 8 2 x 10-6 KBhE(1 - 0 06(V/S) ) (100 - RH)
RELAXATION
RE = (Kr e - ire (ES + CR + SH) Cr e
TOTAL LONG. TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
Ke a = 0 5 FOR POST-TENSIONED MEMBERS
Kor = 1 6 FOR POST-TENSIONED .MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kr• = 5 O KS-1 FOR 270 GRADE LOW RELAXATION STRAND
Jro = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cc = 0 69 FOR LOW RMLAXATION STRAND @ 68% Fu
RESO S
ELASTIC SHORTENING = 2 62 RSI
CREEP = 7 51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 12 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 65 KSI
PAGE 2 -
10
PROJECT PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I_D PB-5/6 TWO SPAN
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
- -
1 61 67 0 35847 - 08516 180-3 1866 1894
2 63 08 0 31897 - 06750 189 4 182 6 177 8
TOTAL 124 75
X = 52 505 FEET STRESS LOSS AT SEATING = 22 19 KSI
PEAK STRESS = 191 4 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBERLENGTH ALPHA LEFT CENTER RIGHT
1 61 67 0 27331 202 S 196 2 189 4
2 63 08 O 25147 189 4 182 6 177 8
- PAGE 3 -
If
Mr I 141E
ENCS I NEER.I NG
7509 27th Drive SE
SNOHOMISH WASHINGTON
98290
FRE L ON G
L�`R I CT I ON / ELONGP�T=C3N PROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-3/4 ADDED TENDONS
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY = 28500 KSI Fu = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES = 15 75 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS = 25 INCH
SYSTEM UNBONDED .STRESSED FROM LEFT
RESULTS
AVERAGE INITIAL TENDON STRESS = 186 09 RSI OR = 68 % Fu
AVERAGE FINAL TENDON STRESS = 170 34 RSI = 37 0 KIPS OR = 63 % Fu
TOTAL TENDON ELONGATION = 5 77 INCHES
AVERAGE TENDON ELONGATION = 078 INCHES PER FOOT
SPAN SPAN SPAN ADD"L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
-----
1 61 67 0 35847 - 08516 3800 6 50 41 50
2 12 00 0 26351 0 00000 41 50 *CANT* 32 00
------ ------- -------
TOTALS 73 67 0 62198 - 08516
PAGE 1
►2
12-04-2007
PROJECT PORT .ANGLES - TRANS CENTER
STRIP I D PB-3/4 ADDED TENDONS
LONGS TERM LOSS CALCULATIONS
pATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f 'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f 'c = 5 000 KSI
T-BEAM. VOLUME TO SURFACE RATIO VIS = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE HUMIDITY RH = 80 %
FORMULAS -USED (ESTIMATING PRESTRESS LOSSES C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ec = 57 (1000 f'a )1/2
ELASTIC SHORTENING
ES = Kee (P/A) (E/E.
CREEP
CR = Kar (P/A) (E/Ec )
SHRINKAGE
SH = 8 2 x 10-6 KshE(1 - 0 06(V/5) ) (100 - RH)
RELAXATION
RE = (Kr o. - J,, (ES + CR + SH) Cr a
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
K•■ = 0 5 FOR POST-TENSIONED MEMBERS.
Kar = 1 6 FOR POST-TENSIONED MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN, MOIST CURE AND STRESSING
Kre = 5 0 KSI FOR 270 -GRADE LOW RELAXATION STRAND
Jre = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cre = 0 72 FOR LOW RELAXATION STRAND @ 69% Fu
RESULTS
ELASTIC SHORTENING = 2 62 KSI
CREEP = 7 .51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 22 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 75 KSI
PAGE 2 -
13
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-314 ADDED TENDONS
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
-
1 61 67 0 35847 - 08516 180 3 185 6 189 4
2 12 00 0 26351 0 00000 189 4 184 2 179 2
TOTAL 73 67
X = 52 505 FEET STRESS LOSS AT SEATING = 22 19 KSI
PEAK STRESS = 191 4 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 61 67 O 27331 202 5 196 2 189-4
2 12 00 0 26351 189 4 184 2 179 2
- PAGE 3 -
t �
LwX1%1IR:
ENt3 I NEER I NQ
7509 77th Drive SE
SNOHOMISH WASHINGTON
98290
F`RELG3NG
Y'R I CT I ON / E LONGATION PRO GR23M
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
PROJECT PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I D PH-5/6 ADDED TENDON
Dm
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY = 28500 KSI F„ = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRANDAREA = 0 217 IN "2
LONG TERM LOSSES = 15 86 RSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS = 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
SULTS
AVERAGE INITIAL TENDON STRESS = 187 54 KSI OR = 69 % Fu
AVERAGE FINAL TENDON STRESS = 171 68 KSI 37 3 KIPS OR = 63 % Fu
TOTAL TENDON ELONGATION = 5 82 INCHES
AVERAGE TENDON ELONGATION = 079 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 61 67 0 28314 - 04739 24-00 6 50 41 50
2 12 00 0 26351 0 00000 41 50 *CANT* 32 00
TOTALS 73 67 0 54664 - 04739
PAGE 1 -
is
12-04-2007
PROJECT PORT ANGLES — TRANS CENTER
STRIP I D PB-5/6 ADDED TENDON
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f'c = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO V/S = 6 14 INCHES
TIME BETWEEN MOIST CURE 6 STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE HUMIDITY RH = 80 %
FORMULAS USED (ESTII+IATING PRESTRESS LOSSES, C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ea = 57 (1000 f'c )1/2
ELASTIC SHORTENING
ES = Kee (P/A) (E/Eci )
CREEP
CR = Kcr (P/A) (E/E. )
SHRINKAGE
SH = 8 2 X 10-6 KohE(1 - 0 06(V/S)) (100 - RH)
RELAXATION
RE = (Kre - Jr, (ES + CR + SH) Cr•
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
PORMULA CONSTANTS
Keo = 0 5 FOR POST-TENSIONED MEMBERS
Kar = 1 6 FOR POST-TENSIONED MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kre = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jra = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cre = 0 74 FOR LOW RELAXATION STRAND @ 69% Fu
RESULTS
ELASTIC SHORTENING = 2 62 KSI
CREEP = 7 51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 34 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 86 ASI
PAGE 2 -
!6
]2-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I.0 PB-5/6 ADDED TENDON
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
1 61 67 0 28314 - 04739 183 2 187 3 190 8
2 12 00 0 26351 0 00000 190 8 185 6 180 6
TOTAL 73 67
X = 53 341 FEET STRESS LOSS AT SEATING = 19 27 K51
PEAK STRESS = 192. 9 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 61 67 0 23575 202 5 198 4 190 8
2 12 00 0_26351 190 8 185 6 180 6
- PAGE 3 -
17
P' IN3M
ENC3 =NEER =NC;
7509 77th Drive BE
SNOHOMISH WASHINGTON
98290
FRELC)NG
LsR I C;T IDN / ELONC3AT I ON F'ROGRA,M
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PE-11/1.2/13 ADDED TENDONS
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K 0002
MODULUS OF ELASTICITY = 28500 KSI Fu = 270 KSI
INITIAL JACKING STRESS - 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES = 16 74 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RESULTS
AVERAGE INITIAL TENDON STRESS = 177 60 KSI OR = 65 % Fu
AVERAGE FINAL TENDON STRESS = 160 86 KSI = 34 9 KIPS OR = 59 % Fu
TOTAL TENDON ELONGATION = 3 89 INCHES
AVERAGE 2ENDON ELONGATION - 075 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 5 25 0 00000 0 00000 28 00 *CANT'* 28 00
2 36 75 0 50923 0 00000 28 00 6 50 41 50
3 10 00 0 77354 0 00000 41 50 *CANT* 18 00
TOTALS 52 00 1 28277 0 00000
- PAGE 1 -
E $
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-11/12/13 ADDED TENDONS
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f 'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f ', = 5 000 RSI
T-SEAM VOLUME TO SURFACE RATIO V/S = %11 26 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 850 KSI
RELATIVE HUMIDITY RH = BO %
FORMULAS USED (ESTIMATING PRESTRESS LOSSES C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ea = 57 (1000 f 'c )1/2
ELASTIC SHORTENING
ES = Kes (P/A) (E/Eci }
CREEP
CR = Kot (P/A) (E/Ec )
STIR I NKAGE
SH = 8 2 x 10-6 KahE(1 - 0 06(V/S) ) (100 - RH)
RELAXATION
RE = (Kra - Jr a (ES + CR + SH) Cr e
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
Kee = 0 5 FOR POST-TENSIONED MEMBERS
Kot = 1 6 FOR POST-TENSIONED MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CORE AND STRESSING
Kra = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jre = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cre = 0 57 FOR LOW RELAXATION STRAND @ 66% Fu
RESULTS
ELASTIC SHORTENING = 3 36 KSI
CREEP = 9 62 KSI
SHRINKAGE = 1 23 KSI
RELAXATION = 2 54 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 16 74 ASI
PAGE 2 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-11/12/13 ADDED TENDONS
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
1 5 25 0 00000 0 00000 172 R 173 Q 173 0
2 36 75 0 50923 0 00000 17'- 0 1R1 5 181 4
3 10 00 0 77354 O 00000 181 4 167 7 16-5
TOTAL 52 00
X = 32 736 FEET STRESS LOSS AT SEATING = 29 67 KSI
PEAK STRESS = 187 7 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
------ ------ ---- ------
1 5 25 0 00000 202 5 202 4 202. 3
2 36 75 0 50923 202 3 193 9 181 4
3 10 00 0 77354 181 4 167 7 155 1
- PAGE 3 -
20
FINE
ENG I NEER =mc;
.7549 77th Drive SE
SNOSONISH WASHINGTON.
98290
FREL.ONG
F1� I CT I ON / EL Oi�7C3AT 2 ON PROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
PROJECT PORT =ANGLES - TRANS CENTER 12-04-2047
STRIP I D PB-11/12/13
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY - 28500 KSI Fu = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES = 16 55 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM BONDED TWO END STRESSING (LEFT SIDE STRESSED FIRST)
RESULT'S
AVERAGE INITIAL TENDON STRESS = 174 87 KSI OR = 64 % Fu
AVERAGE FINAL TENDON STRESS = 158 33 KSI = 34 4 KIPS OR = 58 % Fu
TOTAL TENDON ELONGATION = 7 66 INCHES
AVERAGE TENDON ELONGATION = 074 INCHES PER FOOT
SPAN SPAN SPAN ADD`L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 5 25 0 00000 0-00004 28 00 *CANT* 28`00
2 36 75 0 50923 0 00000 28 00 6 50 41 50
3 33 67 0 68619 0 00000 41 50 6 50 41 50
4 24 42 0 76713 0 00000 41 50 6 50 28 50
5 3 92 0 00000 0 00000 28 50 *CANT* 28 50
TOTALS 104 00 1 96255 0 00000
PAGE 1 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-11/12/13
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f 'oi = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f'c = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO V/S = %11 26 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 850 KSI
RELATIVE HUMIDITY RH = 80 %
FORMULAS USED (ESTIMATING PRESTRESS LOSSES C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ec = 57 (1000 f', )2/2
ELASTIC SHORTENING
ES = Kea (P/A) (E/Eei )
CREEP
CR = Kcr (P/A) (E/Ec )
SHRINKAGE
SH = 8 2 x 10-6 KehE(1 - 0 06(V/S) ) (100 - RH)
RELAXATION
RE = (Kre — Jre (ES + CR + SH) Cre
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
Kee = 0 5 FOR POST-TENSIONED MEMBERS
Kor = 1 6 FOR POST-TENSIONED MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kre = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jre = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cre = 0 53 FOR LOW RELAXATION STRAND @ 65% F,
RESULTS
ELASTIC SHORTENING = 3 36 KSI
CREEP = 9 62 KSI
SHRINKAGE = 1 23 KSI
RELAXATION = 2 35 KSI
-----------------------------------
TOTAL LONG TERM LOSSES = 16 55 KSI
PAGE 2 -
22-
PROJECT PORT ANGLES — TRANS .CENTER 12-04-2007
STRIP I D PB-11/12/13
SPAN SPAN SPAN ADD L STRESS AFIF,:� CND SEA—TNG
NUMBER LENGTH ALPHAS ALPHAS LEFT :FNT=;� RIGHT
1 5 25 0_00000 0 00000 172 y8 172y9 173-0
2 36 75 O 50923 O 00000 173 0 181 S 181 4
3 33 67 0 68619 0 00000 181 4 168 a 172 7
4 24 42 O 76713 0 00000 172 7 172 1 159 9
5 3 92 O 00000 0 00000 1c;9 g 159 8 159 7
TOTAL 104 00
X LEFT = 32 736 FEET X RIGHT = 22 456 FEET
XC = 64 55 FEET
STRESS LOSS 0 SEATING LEFT = 29 67 KSI RIGHT = 42 77 KSI
STRESS AT XC = 164 79 KSI
PEAK STRESS = 187 7 KSI
SPAM SPAN SPAN STRESS AFTER IST PULL & SEATING?
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 5 25 0 00000 172 8 172^'a 1-73 0
2 36 75 O 50923 1713 0 181 181 4
3 33 67 0 6861q 181 n 168 8 157 0
4 24 42 0 76713 157 142 6 1.,4 1•
5 3 92 O 00000 134 1 134 0 133 a
— PAGE 3
23
12/4/2007 BURSTING 80 9.50 PM
#Strands/ # Vert Horz CGS VERTICAL BARS HORRONTAL BARS Ast= 031 #Legs 4
Tendon Tendons Fu Psu da da 0 B x dsp Tauasr I Asr dsp Teuasr I AsT daum dauRsr Spacing Spacing
PB 7/8 VeK Hari. Vert Harz,
ISE 17 1 70 956.2 12.250 12 250 48 30 32 15 32 147.5 2.8° 30 141.4 2.77 16.00 15.00 6.9 6.7
1 DE 17 1 270 956.2 15.000 15.000 48 30 32 15 32 127.0 2.49 30 119,5 2.34 MOO 15,00 810 7.9
PB.5A/6A
1 SE 19 1 270 2068.7 12.250 12.250 48 30 35.5 15 25 136,3 2.67 30 158.1 3.10 12.50 15.00 S.8 6.0
1&2 SE 2fi 1 270 1574.9 26.000 12.250 4B 30 30.5 15 35 101.21' 1.99 30 233.0 4.57 17,50 15. 10.9 4,1
1,2 DE 1 28 1 X70 1574.9 14.625 21.000 48 30 32 15 32 213,81 4.191 30 118.1' 2.321 16.001 15.001 4.71 8.01
#5trands/ 0 Vert Hort CGS VERTICAL BARS HORIZONTAL BARS Ast= 0.2 #Legs 4
Tendon Tendons Fu Psu da da 0 6 y x dsp Tauasr I AsT dsp Tsuasr I AsT dsuasr chum iSpacin& 5 acin
PB 7/8 Vert Hort. Vert I Harz.
ISE 1 1 270 956,2 12.50 12.250 48 30 32 15 32 147.5 2.69 30 141.4 2.77 16.00 25.001 4,4 4.3
1 DE 17 1 270 956.2 15.000 15.000 48 30 32 15 32 127.0 2.49 30 119.5 2.34 16.00 15,00 5.1 5.1
PB-5A/6A
I SE 19 1 270 IM.7 22-250 12.250 48 30 353 15 25 3.9
1&2 SE 28 1 270 1574.9 26.000 12.250 48 30 30.5 15 S 101.24 1.991 30 233.01 4.5 30 158.1 01 7 17.50 1
15.00 7.1 2.6)
1,2 DE I 28 1 270 1574.9 14.625 21.000 48 30 32 15 32 213.81 4.191 30 118.11 2 321 16,001 15.001 3.11 5.21
#Strands/ # Vert Harz CGS VERTICAL BARS HORIZONTAL BARS Ast= 0.31 1 #Legs 4
Tendon Tendons Fu Psu da da 0 B v x dsp TemT I AsT dsp Taum I AsT deuasr dauasr Spacing Spacing
PB-3/4 Vert Harz. Vert Harz.
15E 18 1 '70 1012:4 12.250 12 250 48 30 38.00 15.00 20 98.1 1.92 30 149.8 2.94 10.00 15.00 6,4 6.3
1&2 SE 42 1 270 2362.3 24.000 18.000 48 30 29.7' 15.00 36,46 201.8 3.96 30 236.2 4.63 18.23 15,0 5,7 4.0
1,2&3SE -8 3 270 3037.3 24.000 24.000 48 30 32.00 15.00 32 189.8 3.72 30 151.9 2.95 16.00 15.00 5.3 6.2
012.4 10
000
48 30 32.00 15.00 32
30
16.00
5.8
9.4
2 DE , 12 1 270 1675.0 10.000 2$.00 48 30 32.0 15-00 32 116.0) 2.211 30 150.61 0.99 16.001 15.001 6.7 18.71
PB-5/6
1 SE 12 1 270 675.0 9 875 9.875 48 30 38.00 15.00 20 85.4 1.67 30 113.2 2.22 10. 15,0 7.4 8.4
1&2 SE 12 2 270 1349,9 9.875 24.00 48 30 29 77 15.00 36.46 246.1 4.82 30 67.5 1.32 18.23 15.0 4.7 14.1
1,2&3 SE is 3 270 3037.3 24 000 24.000 48 30 32.0 15.00 32 189.8 3.72 30 151.9 2.98 16.0 15.00 5.3 6.2
zv
12/4/2007 BURSTING BAR 9;50 PM
#Strands/ # Vert Horz CGS VERTICAL BARS HORIZONTAL BARS Ast: 0 31 #Les 4
Tendon Tendons Fu Psu da da D B y x clip TBmT I AsT. dsp Teww AST "deuwdww Spacing SpacinPB-7A/8A Horz. Vert Horz.
1SE 12 1 270 675.0 9.875 9.875 48 30 32 8 32 116.7 2.29 16 64.6 1.27 8.D0 8.7 7.8
1&2 SE 12 2 270 1349.9 9.875 24.000 48 30 32 15 32 233.3 4.5E 30 67.5 1.32 15.00 4.3 14.1
48 30 32 9.5 32 6
1,20E ' 1 270 675.0 14.625 2 2 270 1349.9 14.625 21:00 48 30 32 15 32 x83.21 3.591 30 101.21 1.991
16.001 15.001 15.51 9.41
#Strands/ # Vert Hors CGS VERTICAL BARS HORIZONTAL BARS Ast= 031 #Legs 6
Tendon Tendons Fu Psu da da D B y x dsp TBuosT AsT dsp TauRsT AsT 4ww i dunw Spacing Spacing
PB•ll13 Vert Horz. Vert Horz,
ISE 18 1 170 1012.4 12.250 12.250 48 60 35.50 21.00 25 129.11 2.531 42 179.3 352 12.50 21.00 9.2 11.1
1&25E 29 1 ^70 1631.1 12.000 34.000 48 64 35.50 34.00 25 22&4446 60 176.7 3.46 12.50 30.00 5.2 16.1
1,2&3 SE 40 1 270 2249.9 12.250 17 750 48 6D 32.00 15.00 32 347.1 6.al 30 229.7 4.50 16.00 15.00 4.4 6.2
1,2,3&4SE 58 1 270 3262.3 12.250 24.000 48 60 32.00 15.00 32 503.4 9.87 30 163.1 3.20 16.00 15.00 3.0 8.7
ISEis 1 70 1012.4 12.250 12.25D 48 60 2&5D 21.00 39 173. 42
0.7 ILI
1&2 SE 1 15 2 70 2024.9 12.250 29,500 48 60 2850 30.00 39 347.21 6.811 60 257.31 5 051 19.501 30.001 15.31 11.11
2&3 DE 1 11 2 270 121 70 37 1 1 27 1 1 1.4 14.625 44.000 48 60 18.00 30.00 36 183.7 360 60 82.5 162 B 00 30,001 19 1 1
.334.5
#Strands/ # Vert Horz I CGS VERTICAL BARS HORIZONTAL BARS Ast a 0.31 #Les 4
Tendon Tendons Fu Psu da da D B 1 y x dsp TBumT I AsT dsp TBuasr I AsT deurm dsuw Spa Ong Spacing
PB•1113 Vert Horz. Vert Horz.
1 SE 18 1 270 1012.4 12.250 12.250 48 60 3S.50 21.00 25 129.1 2.53 42 179.31 3.52 12.50 21.00 6.1 7.4
1&25E 29 1 270 1631.1 11.000 34.000 48 60 35.50 30.00 25 228.4 4.48 60 176.71 3.46 12.50 30.00 3.5 10.7
1,2&3 SE 40 1 270 2249.9 12.250 17 750 48 60 32.00 15.00 32 347.1 6.61 30 229.7 4.50 16.00 15.00 2.9 4.1
1,2,3&4SE 58 1 270 3262.3 12.250 24.000 48 60 32.00 15.00 32 503.4 9.87 30 163.1 3.20 16.001 15,001 2.0 5.8
50
12-250 48 60 28.50 21.00
173.6
47
19.50
7.11
1&2 SE 1 18 2 270 2024.9 12 8 1 270 1012.4 ?50 29.500 48 60 28.50 30 00 39 347. 1 6.811 60 257.31 5.051 1 )
19. 50) 30 .00 3.6 7.4
27
2 DE3 1 11 2 27fl 1237.4 14 u25 44 000 48 60 18,1 270 618.7 14625 11.000 48 60 0 30.00 36 183.71 3.60 13-50 92,8 ) 60 82.51 1.621 18.001 30.00) 16.2) 23.01
2&3 OE
N
rrr,o-u,9tt ° ��+a'T-•.,"-..�w'o'w,
Ht)W CM aVISCI N99
.. ;
�-�
N +,,.v+n,wM1-�u,rwr arrc'r„m+ aana l�•n u•'r••'µ „moz ,pa.,.wc '.m ora...Y ,uwa.,.a..
DI� m — .,..,..a w,a a,. .,..nn «,^. ,ol`-, „ ,.,�...xu,x, .,.:ne.,�,,.:,. ,n•..xw ,,,,.
'SWIJVWI MOd HOUVAa13 IJ•30 339 ++.vr. ,u n.n,nx.r.x„a,ns e, v.s uw, . v • . ,
3ldGIS 1N3A 1(10219 vviao aoae�Z.
�"e ,;i �_ �� w ...,,.,' ;..,,,u>n,.,-..._.<n.�, ;�,.„�.>a,•, " '.m,. �„M� f n,,.,, .,..n �, Ya..,pm "�=,
a,acsc� �i qn eon -'• *' � �,r,��a ,.«. >< " - .,..,. ,m. ...,..
0A•iY1,YY 33).I61%1 \,+t'\.\a\',M\\\\\\I,\
., 'SNOI1VW1 alCW N iVASM W30 939
= OJd.l0 CaCM24 O MOO/q 9'V! •�.• vau sua o ,.. .... a.un. -n ,xw „na. •,.w,. va a,a.sus,m,n,u .nz,.v,. •.. .•
mvlaa INRAIMoNs,=-
3VVWOH:)W
If �•��'�� v, vs.am.xwun x. :m m '� w'�a�+�_ n. cn ,wa ,v,u• .+,r ,n v s ..nu
g -�" .� If ' a c,euu , uu, . ur ,. a r, c:,.c, avow ,w m•.,no , v..+n s.
IL„« o-.s.e,o ��.n.r ��b «. ., a a 'rya ,.. dra. •,�M..,�,.,.w,.,,q. ><, .,. .n,. ,.
� E
6
32•ccs ® a@
9 9 9 99 9 9 9 8 9 a s d 9
+
o a 47
s o
711
L
,°mL i- q
i �l gy115i55p
$D.
o II Y Y Y Y Y Y Y Y Y y)3!4 g10
1+1+4 a a a p p p l 5D
gM o fel
O jI :?Bi4Yi4t�•• 44D
0 0 �- •7 7i! t IA!
Y
W Z
sli
eIy� if
BIi
1 � �
4k 4 ! P p a
97
El
Ll
4� �
'�
fry
5y a
W
D I 1 • +
A
8
I
ICK II A!�
LB
0
I BEAM DETAIL PB 344
It�llwnnns '
pPppRR77 a+c
�v INTERrWTi EONAL GATEWAY cr 11 SEWCE a e�cAne.� � o asn fA ARWNLL ws
PORI ANCsELES WA Itl. DAR � D D
r-----1 n 1 16,F:
P1
2 nis
K g s 3 5 21315 5 3 e dids
a :1,g SIT I tills Eli Fjg
a z A
4%
•
44--�E
414
1316
Ir 1;
2A
BEAM DETAIL P5-54(o
PORT AWiELES
IrEW GATEWAY sr
OWWA
L
E� WAmw.mP,i=- R
Qm
F,Q€ REtElytit tit£ Ai
251y K
its Y g 9 9 9 3 93 3 9 d d d 3
b P
2►
2K—55-
41,
�'l E�y55dgE55�55y
!
O I1I I!
i�l p7444QQ444 •'•6��
w
1
f
r f
6
I
3
—°
QRU3
,
g
A
A � I
a •a�
r
e I
A
� z
0
4A
Ib
M �i`)TI1
BEAM DETAIL P5-5a46
nannm as
PORT ANGELES
INTERNATIGNAL GATEWAY ooS 'F sect +a SF.RICF
PORT ANGELES WA Ho. Dore mea m
3rcvsV, Oa "eg£H A ;Fi
Y g 9 9 9 S1219.3 9�d d d sit p
If
tl>K a ooaua o H p
�i�
galp'55ia&55n55all
aa
j
I • q,}He6'w•isa a
1-70
IIIA • -� 3
1
4b S
44
r ,
E � s
m
m % �I i
In I
In
1144
2 5
Bak
rosea-�m
DFD.
BEAM DETAIL P5-148WTIrm
• o�
PORT ANGELES `"`
I
E*OPORT
INTERIATIONAL GATEWAY �N o. ct u ovPMAR AL
ANGELES WA ,a.a.m wa wre l- w
!�, �a� ■ !!�� °
©- _ , ' s ;;■ƒ!�! !, |���. |
_ ■„t � �i��■■■!!!§
It
� � ■ ■
■
: a „-,,,,�5 |
9 ( k &
Alm-
' k@,.,,,.,.•�-.&
\
§k
A
` m 9
1>
■® | ^
|
|■
-
!
a \
§ ;\
�q
-
� � 2ft-
~ |
a -
_ f .
244 |§
- - -
� §
U3| | - 5M DETAIL FTE-lA45A �� ,_ ■ _
| | ` ?Eal�aaEala�Y
eZ WA
l i
iyl �
04 3 I
2615 iAy �� - �Y R S�9 34S 9 9 S 9 �d diS a
R a
It
i" 3�ii � s nYa 4 oso a
11 �
Iro Rh ny i !'
6 it w 1 5 i11011151mo55a
ig" 5 1 I I
w
®
rnW�
Ift
•�'m ' n � j.g4 9 4 4 4 4 yp74�p
�; ,�� F?44 8444 RR"'•4�u
je
5h I � 6 9
F4 1
3W � tU3tT
f77
CA
�3am _
—
a3 �
L, eh
-
n
wh
J 8
! �
54
i0
C
W
Na
i BM. DETAIL PB 1112413 ,
PORT AN
INTERdAAOwn
TIONALGELES
CsATEWAY - vn. ABRiC.
PORT ANGELES WA loll
Seattle 811 First Avenue,Suite 620 Scatt1c,WA 98104 tel:206.292.5070
Tacoma 1 950 Pacific Avenue,Sitite 1100 Tacoma,WA 98102 tel:253.3113'2797
mmw hcs-structural coin
November 10 2008
Krei Architecture
c/o Parametrix
2102 N Pearl Street, Suite.301
Tacoma, WA 98406
ATTN' Stan Cruse
RE. Port Angeles International Gateway— Plaza.Deck Review
Dear Stan.
We have reviewed the solution to address the delamination area under P83 proposed by Bright
Engineering and find it structurally acceptable We reviewed the drawings provided to us and
spoke with Ade-Bright about the solution In our conversation we shared a recentexperience
We had with shallow embed depths for epoxy anchors and recommended using 6-inch
embedment where possible. Additional embedment lengths may help reduce potential cracking
at this area that could be caused by future concrete shrinkage and thermal cycles.
Thank you for the opportunity to be of service Please contact us if you have any questions.
Very truly yours,
PCS STRUCTURAL SOLUTIONS
Paul J Brienen S E.
Principal B1-1P
¢ pf
PJBvmm
09-058 x
1d
A"
9058
9058ltr 11-10-08.pjb
t'
STRUCTURAL CALCULATIONS
PORT ANGELES INTERNATIONAL GATEWAY
RESPONSE TO COPA COMMENTS
PREPARED FOR:
KREI ARCHITECTURE-A PARAMETRIX COMPANY
BEI NO' 116.03R
NOVEMBER 7 2008
<r, --
1809 7"'Ave. Suiie 1100 1 Seolite,WA 98101 1 T 266.625.3777 1 F•206.625.1851 1 www.brighteng.com into@brighteng.com
6
PORT ANGELES INTERNATIONAL GATEWAY
RESPONSE TO COPA COMMENTS
CALCULATIONS INDEX
I?ESCBIPTION PAGE NO,
Item 1 C&D 1
Item 2 D&F 7-001 —7-004*
Item 3 C 2 21
Item 5 FS-18
*Previously Submitted
u"1�Q
. �1• BRI
J�
OVAL G
Y
I
-7 Rriekt Engineering Inc Consulting Structural and Civi[Engineering
1809 71h Avenue,Suite 1100 I Seal Ile,WA 98101 ( P-206.625.3777 I F•206.625.1851 1 in(WObrighleng.com
Date: 9/ /09 By Josh Brown BEI No. 116.03R Sheet No. of Sheets
Subject: Port Angeles International Gateway _
r-- 1
PL
N.
S c ads°
qO
BRIGHT ENGINEERING INC Consulting Structural Civil Engineering
PROJE
(5�kj4,LROJEcT No. Sheet
No.
SUBJECT 6rDATE By
'7
1"0 m A
T m
ADAPT-STRUCTURAL CONCRETE SOFTWARE SYSTEM
ADAPT-PT Verslon 6 18 Dale:1117/2008 Time:10:16.45 AM File:PB3 and PB4 10-07
1 PROJECT TITLE Port Angeles Intemational Gateway Plaza
1 1 DESIGN STRIP Beam Srtng along B
2 MEMBER ELEVATION j��) [/�) 01
Ift) 1d 61.59 `�� 64.00 l
3 TOP REBAR
3.1 User selected
3.2 User selected
j 3.3 ADAPT selected
3.4 ADAPT selected
.2 Dawm LION PROFILE - --
ne
i
4.3 CGS Distance(In) 16.00 42.50 6.50.6.50 -41.50 16.13
4.4 Strands 18
4.5 Force 11286,45 idp3l [597.952 kips[
5 BOTTOM REBAR
5.1 User selected
52 User selected
5.3 ADAPT selected z 1#9x15.0•
5.4 ADAPT selected tai WX211 6-
6 REQUIRED& PROVIDED BARS
6.1 Top Bars max 0,00 0
[it 0. - I
required
provided 1• j
1. I
6.2 Bottom Barsmax 0.00 1.43
7 SHEAR STIRRUPS
7 1 ADAPT selected. !
Bar Size#5 Legs:2 �=Ij Spacing[n] --
7.2 User-selected
Bar Size# Legs:
7.3 Required area 0.4
[in'!ft] 0.1 0.2 fIF-Fll-
.54
8 LEGEND -4 Stressing End f Dead End
I
9 DESIGN PARAMETERS
9.1 Code:ACI t' = 5 ksl fy- 60 ksi(longitudinal) fy= 60 ksl(shear) fp,= 270 ksi
9.2 Rebar Cover Top= 2 In Bottom= 2 in Rebar Table:ASTM US Customary bars (Non-redistributed Moments) '
9.3 Stressing:[q= 7 fp.
9.4 Strand Area= .217 int
10 DESIGNER'S NOTES
------------------------------ -------- --------------------------------------
ADAPT CORPORATION
f STRUCTURAL CONCRETE SOFTWARE SYSTEM
f 1733 Woodside Road, Suite 220 Redwood City California 94061
----------- ------------------------------------------------------------------
ADAPT-PT FOR POST-TENSIONED BEAM/SLAB DESIGN
Version 6 1B AMERICAN (ACI-318-99/USC-1997)
ADAPT CORPORATION - Structural Concrete Software System
] 1733 Woodside Road Suite 220, Redwood City California 94061
Phone (650)306-2400 Fax (650)364-4678
Email Support@AdaptSoft com Web site http //www AdaptSoft com ]
------------------------------------------------------------------------------
DATE AND TIME OF PROGRAM EXECUTION Nov 7 2008 At Time 10 9
PROJECT FILE PB3 and PB4 10-07
P R O J E C T T I T L E
Port Angeles International Gateway - Plaza
Beam Sring along B
1 - USER SPECIFIED G E N E R A L D E S I G N P A R A M E T E R S
CONCRETE
STRENGTH at 28 days, for BEAMS/SLABS 5000 00 psi
MODULUS OF ELASTICITY for BEAMS/SLABS 3600 00 ksi
CREEP factor for deflections for BEAMS/SLABS 2 00
CONCRETE WEIGHT NORMAL
TENSION STRESS limits (multiple of (f'c)1/2)
At Top 6 000
At Bottom 6 000
COMPRESSION STRESS limits (multiple of (f'c))
At all locations 450
REINFORCEMENT
YIELD Strength 60 00 ksi
Minimum Cover at TOP 2 00 in
Minimum Cover at BOTTOM 2 00 in
POST-TENSIONING
SYSTEM BONDED
Ultimate strength of strand 270 00 ksi
Average effective stress in strand (final) 156 60 ksi
Strand area 217 in'2
Min CGS of tendon from TOP 6 50 in
Min CGS of tendon from BOTTOM for INTERIOR spans 6 50 in
Min CGS of tendon from BOTTOM for EXTERIOR spans 6 50 in
J
Page 2 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
-- ------------------------------------------------------- -------------------
Min average precompression 125 00 psi
Max spacing between strands (factor of slab depth) 8 00
Tendon profile type and support widths (see section 9)
ANALYSIS OPTIONS USED
Structural system BEAM
Moment of Inertia over support is NOT INCREASED
Moments REDUCED to face of support YES
Effective flange width consideration YES
Effective flange width implementation method ACI-318
2 - I N P U T G E O M E T R Y
2 1 1 PRINCIPAL SPAN DATA OF UNIFORM SPANS
-----------------------------------------------------------------------•--------
S FI I TOP BOTTOM/MIDDLE
P O FLANGE FLANGE REF MULTIPLIER
A R LENGTH WIDTH DEPTH width thick width thick HEIGHT left right
N M ft , in in in in in in I in
-1-----3----4- ---- 5-------6-------7------8------9------10----11-----12----13-
1 2 61 58 30 00 48 00 152 00 7 50 00 50 50
2 2 64 00 30 00 48 00 152 00 7 50 00 50 50
------------------------------------------------------------------------------
LEGEND
1 - SPAN 3 - FORM
C = Cantilever 1 = Rectangular section
2 = T or Inverted L section
3 = I section
4 = Extended T or L section
7 = Joist
8 = Waffle
li - Top surface to reference line
2 1 3 EFFECTIVE WIDTH DATA OF UNIFORM SPANS
----------------------------------------------------------
SPAN EFFECTIVE WIDTH
in
----------1-------------------------2---------------------
1 150 00
2 150 00
Page 3 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
- ------------------------------------------------------------------------- --
2 2 - S U P P O R T W I D T H A N D C 0 L U M N D A T A
SUPPORT <------- LOWER COLUMN ------> <------ UPPER COLUMN ------>
WIDTH LENGTH B(DIA) D CBC* LENGTH B(DIA) D CBC*
JOINT in ft in in ft in in
--1-------2-- ------3-------4-------5-----6---------7-.------8-------9----10---
1 24 00 00 00 00 (1) 00 00 00 (1)
2 24 00 00 00 00 (1) 00 00 00 (1)
3 24 00 00 00 00 (1) '00 00 00 (1)
*THE COLUMN BOUNDARY CONDITION CODES (CBC)
Fixed at both ends (-STANDARD) = 1
Hinged at near end fixed at fax end = 2
Fixed at near end, hinged at far end = 3
Fixed at near end roller with rotational fixity at far end = 4
3 - I N P U T A P P L I E D L 0 A D I N G
<---CLASS---> <--------------TYPE------- ------------>
D = DEAD LOAD U = UNIFORM P = PARTIAL UNIFORM
L = LIVE LOAD C = CONCENTRATED M = APPLIED MOMENT
Li= LINE LOAD
Intensity ( From To ) ( M or C At) Total on Trib
SPAN CLASS TYPE k/ft'2 ( ft ft ) (k-ft or k ft) k/ft
-1-----2------3--------4----------5--------6---------7-------8---------9------
1 L C 1 70 48 00
1 L Li 00 61 58 1 870
1 D C 3 20 48 00
1 D Li 00 22 00 6 940
1 D Li 00 61 58 4 070
1 D Li 42 00 61 58 1 790
1 D Li 55 00 61 58 900
2 L Li 00 64 00 1 870
2 D Li 22 00 38 00 900
2 D Li 00 64 00 4 070
NOTE LIVE LOADING is SKIPPED with a skip factor of 1 00
w
r
Page 4 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
-- -------- -------------------------------------------- ---------------------
3 1 - LOADING AS APPEARS IN USER-S INPUT SCREEN PRIOR TO PROCESSING
UNIFORM
(k/ft"2) ( CON or PART ) { M O M E N T }
SPAN CLASS TYPE LINE(k/ft) ( k@ft or ft-ft } { k-ft @ ft }
-1-----2------3---------4------------5-------6-------- --7-------8------------
1 L C 1 70 48 00
1 L L 1 870 00 61 58
1 D C 3 20 48 00
1 D L 6 940 00 22 00
1 D L 4 070 00 61 58
1 D L 1 790 42 00 61 58
1 D L 900 55 00 61 58
2 L L 1 870 00 64 00
2 D L 900 22 00 38 00
2 D L 4 070 00 64 00
NOTE LIVE LOADING is SKIPPED with a skip factor of 1 00
4 - C A L C U L A T E D S E C T I O N P R O P E R T I E S
4 1 For Uniform Spans and Cantilevers only
<------ Tributary Width ------> <------ Effective Width ------
SPAN AREA Yb Yt I Yb Yt
in"2 in in in"4 in in
--1-------------2-----------3--- -- --4-------------5-----------6---------7--
1 2355 00 31 87 16 13 5078E+06 31 79 16 21
2 2355 00 31 87 16 13 5078E+06 31 79 16 21
Note
--- = Span/Cantilever is Nonuniform see block 4 2
w
Y
Page 5 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACT
---------------------------------------- ---------------------------------------
5 - D E A D L 0 A D M O M E N T S S H E A R S & R E A C T I O N S
< 5 1 S P A N M O M E N T S (k-ft) > < 5 2 SPAN SHEARS (k) >
SPAN M(1)* Midspan M(r)* SH(1) SH(r)
_-1---------2--------------3---------------4--------------5-----------6-------
1 04 1661 07 -2621 90 -214 74 232 74
2 -2621 88 972 69 - 01 -178 86 96 02
Note
* = Centerline moments
JOINT < 5 3 REACTIONS (k) > <- 5 4 COLUMN MOMENTS (k-ft) ->
--1---------------2-----------------Lower columns----Upper columns-----
1 214 74 00 00
2 411 60 00 00
3 96 02 00 00
6 - L I V E L 0 A D M O M E N T S S H E A R S & R E A C T I O N S
<-- 6 1 L I V E L 0 A D SPAN MOMENTS (k-ft) and SHEAR FORCES (k) -->
<----- left* -----> <--- midspan ---> <---- right* -----> < -SHEAR FORCE-->
SPAN max min max min max min left right
-1-------2---------3--------4--------5---------6---------7--------8--------9--
1 00 01 676 83 -243 82 -929 88 -442 24 -50 77 74 00
2 -929 88 -442 23 713 62 -221 12 00 00 -74 37 52 22
Note
* = Centerline moments
<- 6 2 REACTIONS (k) -> <---- --- 6 3 COLUMN MOMENTS (k-ft) -------->
<--- LOWER COLUMN ---> <--- UPPER COLUMN --->
JOINT max min max min max min
--1-----------2----------3-- ------- -4----------5------------6----------7----
1 50 77 -7 92 00 00 00 00
2 148 37 72 99 00 00 00 00
3 52 22 -6 91 00 00 00 00
Note Block 6 1 through 6 3 values are maxima of all skipped loading cases
Page 6 (PB3 and PB4 10-07) ADAPT PT V- 6 18 ACI
-------- ---- ---------------------------------------------------------------
7 - M O M E N T S REDUCED TO FACE-OF-SUPPORT
7 1 R E D U C E D DEAD LOAD MOMENTS (k-ft)
SPAN <- left* -> <- midspan -> <- right* ->
--1--------- -----2---- - - -- 3-------------4-------------------------------
1 209 25 1660 83 -2392 50
2 -2445 00 972 50 94 00
Note
* = face-of-support
7 2 R E D U C E D LIVE LOAD MOMENTS (k-ft)
<----- left* ------> <---- midspan ----> <----- right* ----->
SPAN max min max min max min
-1----------2----------3-----------4----------5-----------6----------7-----
1 -7 92 49 84 676 83 -243 63 -856 67 -377 08
2 -856 67 -421 08 713 58 -221 08 -6 91 51 28
Note
* = face-of-support
8 - SUM OF DEAD AND LIVE MOMENTS (k-ft)
Maxima of dead load and live load span moments combined -
for serviceability checks { 1 OODL + 1 DOLL )
<----- left* ------> <---- midspan ----> <----- right* ----->
SPAN max min max min max min
-1----------2----------3-----------4----------5-----------6 ---------7-----
1 201 33 259 09 2337 67 1417 00 -3249 17 -2769 58
2 -3301 67 -2866 08 1686 08 751 42 67 09 145 28
Note
* = face-of-support
9 - SELECTED POST-TENSIONING FORCES AND TENDON PROFILES
i•
Page 7 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACT
------------------------------------------------------------------------------
9 1 PROFILE TYPES AND PARAMETERS
LEGEND
For Span
1 = reversed parabola
2 = simple parabola with straight portion over support
3 = harped tendon
For Cantilever
1 = simple parabola
2 = partial. parabola
3 = harped tendon
9 2 T E N D O N P R O F I L E
TYPE X1/L X2/L X3/L A/L
----------1--------2----------3----------4----------5--- --
1 1 100 500 100 000
2 1 100 500 100 000
9 3 - SELECTED POST-TENSIONING FORCES AND TENDON DRAPE
Tendon editing mode selected TENDON SELECTION
<-------- SELECTED VALUES --------> <--- CALCULATED VALUES --->
FORCE <- DISTANCE OF CGS (in) -> P/A Wbal Wbal
SPAN (k/•-) Left Center Right (psi) (k/-) (WDL)
--1----------2---------3--------4--------5-----------6----------7--------B--
1 1286 450 16 00 -41 50 -6 50 546 26 6 841 94
2 597 952 -6 50 -41 50 -16 13 253 91 2 938 68
Approximate weight of strand 2849 8 LB
9 35 - TENDON SELECTION DATA
TYPE SEL FORCE <--------------- -- TENDON EXTENTS ----------------------->
(k ) <1> <2>
--1----2-----3-- �- -- I ----- ----- ----- --- ----- ----- , ----- -_--- -----�
A 18 31 84
B 24 31 16 <=====I
9 5 R E Q U I R E D MINIMUM P O S T - T E N S I O N I N G FORCES (kips)
Page 8 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
---------------------------------------------------------- -------------------
<- BASED ON STRESS CONDITIONS -> <- BASED ON MINIMUM P/A ->
SPAN LEFT* CENTER RIGHT* LEFT CENTER RIGHT
--1----------2-----------3----------4---------------5---------6---------7----
1 00 813 18 754 45 294 38 294 38 294 38
2 770 92 698 28 00 294 38 294 38 294 38
Note
* = face-of-support
9 6 S E R V I C E S T R E S S E S (psi) (tension shown positive)
L E F T * R I G H T *
TDP BOTTOM TOP BOTTOM
max-T max=C max-T max-C max-T max-C max-T max-C
-1------2--------3--------4--------5----------6--------7--------8--------9--
1 ----- -644 69 ----- -370 89 ----- -368 98 -- - -1289 88
2 ----- -335 06 ----- -1322 52 ----- -299 71 ----- -i62 76
Note
* = face-of-support
C E N T E R
TOP BOTTOM
max-T max-C max-T max-C
-1- ----------------------2--------3--------4----- --5-------------------- -
1 ---- -645 94 ----- -1042 40
2 ----- -661 50 545 28 -156 87
9 7 POST-TENSIONING B A L A N C E D M O M E N T S SHEARS & REACTIONS
<-- S P A N M 0 M E N T S (k-ft) --> <-- SPAN SHEARS (k ) -->
SPAN left* midspan right* SH(1) SH(r)
--1---------2--------------3--------------4---------------5----------6------
1 20 55 -2077 50 2275 00 -20 84 -20 84
2 2284 17 -622 42 13 99 20 05 20 05
Note
* face-of-support
<--REACTIONS (k ) --> <-- COLUMN MOMENTS (k-ft) -->
-joint------------2-----------------Lower columns-----Upper columns-----
1 20 840 000 000
2 -40 890 000 000
3 20 050 000 000
4 �
Page 9 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
------------- --------------------------- ------------------------------------
10 - F A C T O R E D M O M E N T S & R E A C T I O N S
Calculated as ( 1 40D + 1 70L + 1 00 secondary moment effects)
10 1 FACTORED DESIGN MOMENTS (k-ft)
<----- left* ------> <----- midspan ----> <----- right* ----->
SPAN max min max min max min
-1------- --2----------3-----------4----------5-----------6-----------7-----
1 284 33 379 23 4117 75 2552 65 -3556 91 -2741 39
2 -3625 69 -2832 56 3216 52 1627 46 133 60 229 04
Note
* = face-of-support
10 2 SECONDARY MOMENTS (k-ft)
SPAN <-- left* --> <- midspan -> <-- right* -->
-1-----------2-----------------3--------------;-4------ -
1 20 84 641 58 1262 50
2 1263 33 641 58 20 05
Note
* = face-of-support
10 3 FACTORED REACTIONS 10 4 FACTORED COLUMN MOMENTS (k-ft)
(k) <-- LOWER column --> <-- UPPER column -->
JOINT max min max min max min
-1----------2----------3-----------4----------5-----------6----------7-----
1 407 73 307 96 00 00 00 00
2 787 63 659 43 00 00 00 00
3 243 25 142 73 00 00 00 00
11 - M I L D S T E E L
SPECIFIC CRITERIA for ONE-WAY or BEAM SYSTEM
- Dead + 25* of unreduced Live load capacity requirement
r 1
Page 10 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
--------------------------- --------------------------------------------------
Ratio of reduced to total Live loading 1 00
- Minimum steel 0 004A
- Moment capacity > factored (design) moment
Support cut-off length for minimum steel(length/span) 17
Span cut-off length for minimum steel(length/span) 33
Top bar extension beyond where required 12 00 in
Bottom bar extension beyond where required 12 00 in
REINFORCEMENT based on NO REDISTRIBUTION of factored moments
-------- ---- -------------------------- -------------------------------------
11 1 TOTAL WEIGHT OF REBAR = 190 4 lb AVERAGE = 1 psf
TOTAL, AREA COVERED = 1569 75 f t'2
11 2 1 S T E E L A T M I D - S P A N
T 0 P B 0 T T 0 M
As DIFFERENT REBAR CRITERIA As DIFFERENT REBAR CRITERIA
SPAN (in^2) <---ULT-----MIN--D+ 25L-> (in 2) <---ULT-----MIN--D+ 25L->
--1------2---------3-------4-------5-----------6---------7-------8-------9--
1 00 ( 00 00 00) 00 ( 00 00 00)
2 00 ( 00 00 00) 1 43 ( 1 43 00 00)
11 3 1 S T E E L A T S U P P O R T S
T 0 P B O T T O M
As DIFFERENT REBAR CRITERIA As DIFFERENT REBAR CRITERIA
JOINT (in''2) <---ULT-----MIN--D+ 25L--> (in'2) <---ULT-----MIN--D+ 25L->
--1------2---------3-------4-------5---------- 6---------7-------8-------9----
1 00 { 00 00 00) 00 ( 00 00 00)
2 00 ( 00 00 00) 00 ( 00 00 00)
3 00 ( 00 00 00) 00 ( 00 00 00)
11 2 2 & 11 3 2 SELECTION OF REBAR
------------------------------------------------------
SPAN ID LOCATION NUM BAR LENGTH (ft] AREA [i n'2)
--1----2-----3------4----5-------6-------- 7----------
2 1 B 1 # 9 x 2116" 1 00
2 2 B 1 # 9 x 15 0" 1 00
---------------------------------------- ------- -----
Notes
Bar location - T = Top B = Bottom
NUM - Number of bars
Refer to tables 11 5 1 11 5 2 and PTsum graphical display for
positioning of bars
Page 11 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
-------------------------------------------------------------------------------
11 5 1 STEEL DISPOSITION - TOP BARS
------- ----------- TOP STEEL -----------
SPAN ID LOCATION I NUM BAR LENGTH [ft]
--1---- --2------3----- 1 ---4----5------6-------
11 5 2 STEEL DISPOSITION - BOTTOM BARS
-- ---- -------- BOTTOM STEEL -------------
SPAN ID LOCATION f NUM BAR LENGTH Eft] f
--1-- - --2------3----- 4----5------6------- I
2 1 CENTER 11 # 9 x 21 2--
2 2 CENTER 1 1 # 9 x 14 101-
---- --------------- I-----------------------�
12 - S H E A R D E S I G N FOR BEAMS AND ONE-WAY SLAB SYSTEMS
LEGEND
Concrete = NORMAL weight (full shear allowed for)
d = value of d used in shear equations
#6O = spacings of two-legged #6 stirrups (fy= 60000 psi)
***** means no stirrups are required
Mu Vu = factored moments and shears (secondary moment effects included)
CASES Vc = 1 ACI shear equations govern
2 min permissible value of 2 (fc) ^1/2 governs
3 max permissible value of 5(fc) "1/2 governs
Av = 1 no reinforcement required
2 min reinforcement required for beams only
3 stirrup required by analysis
Note for LEFT CANTILEVER (if any) X/L= 0 00 is at tip of cantilever
and X/L= 1 00 is at first support
SPAN = 1 LENGTH = 61 58 ft (Net span from 1 00 to 60 58 ft )
X d Vu Mu RATIO Av # 5® CASES
X/L ft in k k-ft Vu/Vc in"2/ft in Vc Av REMARKS
v
Page 12 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
----------- ------------------------------------------------------------------
--1---- 2----- -3 -- ---4----------5-------6------7------6-----9-10------11----
00 00 38 40 -407 78 07
05 3 08 38 40 -350 54 1167 50 1 04 16 24 0 (1 3)
10 6 16 38 40 -293 29 2158 60 1 43 54 13 8 (1 3)
15 9 24 38 40 -236 04 2973 58 1 49 47 15 7 (1 3)
20 12 32 38 40 -178 79 3612 12 1 29 25 24 0 (2 3)
25 15 40 38 40 -121 54 4074 51 88 17 24 0 (2 2) BEAMS ONLY
30 18 47 38 40 -64 29 4360 61 46 00 ***** (2 1)
35 21 55 3B 63 24 21 4470 40 17 00 ***** (2 1)
40 24 63 40 22 46 10 4437 63 32 00 ***** (2 1)
45 27 71 41 18 65 42 4319 72 44 00 ***** (2 1)
50 30 79 41 50 92 76 4117 75 62 16 24 0 (2 2) BEAMS ONLY
55 33 87 41 06 120 09 3831 48 81 16 24 0 (2 2) BEAMS ONLY
60 36 95 39 75 147 42 3461 16 1 03 16 24 0 (2 3)
65 40 03 38 40 174 75 3006 57 1 05 17 24 0 (1 3)
70 43 11 38 40 204 85 2466 35 1 00 17 24 0 (1 2) BEAMS ONLY
75 46 19 38 40 239 91 1823 08 68 17 24 0 (1 2) BEAMS ONLY
80 49 26 38 40 282 32 1062 65 82 17 24 0 (3 2) BEAMS ONLY
B5 52 34 38 40 317 37 160 B1 92 17 24 0 (3 2) BEAMS ONLY
90 55 42 38 40 352 95 -1554 99 1 02 17 24 0 (3 3)
95 58 50 39 75 391 88 -2701 73 1 09 20 24 0 (3 3)
1 00 61 58 41 50 430 80 -3968 26
SPAN - 2 LENGTH = 64 00 ft (Net span from 1 00 to 63 00 ft )
X d Vu Mu RATIO AV # 50 CASES
X/L ft in k k-ft Vu/Vc in"2/ft in Vc AV REMARKS
--1-----2-------3-------4----------5-------6------7------8-----g-10------11----
00 00 41 50 -356 78- -3968 26
05 3 20 39 75 -328 37 -2872 06 1 05 16 24 0 (1 3)
10 6 40 38 40 -299 97 -1866 70 87 17 24 0 (3 2) BEAMS ONLY
15 9 60 38 40 -271 55 -1077 69 78 17 24 0 (3 2) BEAMS ONLY
20 12 80 36 40 -243 15 472 80 70 17 24 0 (3 2) BEAMS ONLY
25 16 00 38 40 -214 75 1167 81 62 08 24 0 (3 2) BEAMS ONLY
30 19 20 38 40 -186 33 1771 95 75 08 24 0 (1 2) BEAMS ONLY
35 22 40 36 40 -151 43 2285 09 83 08 24 0 (1 2) BEAMS ONLY
40 25 60 39 75 -124 99 2699 36 82 08 24 0 (1 2) BEAMS ONLY
45 2.8 80 41 06 -92 55 3009 84 62 07 24 0 (2 2) BEAMS ONLY
50 32 00 41 50 -60 11 3216 52 40 00 ***** (2 1)
55 35 20 41 18 -27 68 3319 35 19 00 ***** (2 1)
60 38 40 40 23 16 01 3318 52 11 00 ***** (2 1)
65 41 60 38 65 44 41 3221 84 32 00 ***** (2 1)
70 44 80 38 40 72 82 3034 38 53 08 24 0 (2 2) BEAMS ONLY
75 48 00 38 40 101 23 2755 85 73 07 24 0 (2 2) BEAMS ONLY
80 51 20 38 40 129 63 2386 47 94 07 24 0 (2 2) BEAMS ONLY
85 54 40 38 40 158 04 1926 20 97 07 24 0 (1 2) BEAMS ONLY
90 57 60 38 40 186 45 1375 03 91 07 24 0 (1 2) BEAMS ONLY
Page 13 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
----------------------------------------------------- ---------- - ---------
95 60 80 38 40 214 85 732 96 65 07 24 0 (1 2) BEAMS ONLY
1 00 64 00 38 40 243 26 - 02
r
1 -7
Page 14 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
-- ---------------------------------------------------- ---------------------
13 - MAXIMUM S P A N D E F L E C T I O N S
Concrete s modulus of elasticity Ec = 3600 00 ksi
Creep factor K = 2 00
(effective/Igross (due to cracking) K = 86
where stresses exceed 6(fc ) ^1/2 cracking of section is allowed for
values in parentheses are (span/max deflection) ratios
< DEFLECTION ,ARE ALL IN inches DOWNWARD POSITIVE >
SPAN DL DL+PT DL+PT+CREEP LL DL+PT+LL+CREEP
-1----- --2--------3-----------4----------------5---------------6------
1 67 - 09 - 27( 2727) 15( 4808) - 12( 6304)
2 35 18 53 ( 1438) 19( 4009) 73 ( 1058)
u
Page 15 (PB3 and PB4 10-07) ADAPT PT V- 6 18 ACI
--------- --------------------------------------------------------------------
16 - FRICTION, ELONGATION AND LONG TERM STRESS LOSSES
16 6 LONG TERM STRESS LOSS CALCULATIONS
16 6 1 INPUT PARAMETERS
Type of strand STRESS RELIEVED
Modulus of elasticity of strand 29000 00 ksi
Average weight of concrete NORMAL
Estimate age of concrete at stressing 28 days
Modulus of elasticity of concrete at stressing 3600 00 ksi
Modulus of elasticity of concrete at 28 days 3600 00 ksi
Estimate of average relative humidity BO 00 %
Volume to surface ratio of member 4 00 in
16 6 2 CALCULATED LONG-TERM STRESS LOSS(average of all tendons)
<----- STRESS (ksi) ------->
SPAN start center right
-1----------2-----------3-----------4----
1 20 04 28 89 22 42
2 22 42 17 46 15 37
16 7 FRICTION AND ELONGATION CALCULATIONS
16 7 1 INPUT PARAMETERS
Coefficient of angular friction (meu) 070 /rad
Coefficient of wobble friction (K) 0014 /ft
Ultimate strength of strand 270 0 ksi
Ratio of jacking stress to strand's ultimate strength 700
Anchor set 250 in
Cross-sectional area of strand 217 in"2
16 7 2 CALCULATED STRESSES(average of all tendons)
LENGTH <TENDON HEIGHT(in )> Horizontal ratios <-- STRESS (ksi) -->
SPAN ft P start center right Xl/L X2/L X3/L start center right
-1-----2-----3 -----4------5-------6------7-----B-----9------10-----11------12--
1 61 58 1 -16 00 -41 50 -6 50 10 50 10 138 90 141 15 144 28
2 64 00 1 -6 50 -41 50 -16 13 10 50 10 144 28 153 09 143 91
-- ---------------------------------------------------------------------------
Note P= tendon profile (refer to legend of data block 9)
Stresses at each location are the average of strands after anchor set
and after long-term losses
Page 16 (PB3 and PB4 10-07) ADAPT-PT V- 6 18 ACI
--------------- ----------- ------------------ - ----------- -----------------
16 8 TENDON SELECTION AND DATA
<------ TENDON EXTENTS ------> ELONGATION Stress ratios
TYPE OFF FORCE CAN<------ S P A N S ----->CAN LEFT RIGHT Anch Max
<1><2> (in) (in)
-.1----2----3---------------------4-------------------5------6-------7-----8---
A 18 31 84 <======> 8 40 34 62 64
B 24 31 16 <===I 4 28 00 62 64
Note Force is the average value per strand (k)
Stress ratios are at anchorage (7) and maximum along tendon (8)
Post-Tensioning Diagrams Y
File: PH3 and PH4 10-07
® X
Post-Tensioning Required Post-Tensioning Provided
1250 -
Project Name
_2- 10Q0 PB3
rn
'c 750
a -
.N
C
F- 500 Nov 7 2008
sn
O
0-
250 10 22. AM
0 -- - - -
Span 1 Span 2
ADAPT-PT
6 18
Moment Diagrams
File. PB3 and PB4 I0-07
Dead Load Live Load Min Live Load Max Post-Tensioning
Service Min Service Max Stren_gth Min Stren th Max i
Project Name '
I
-2500
! _ PB3
C -
0 Nov 7 2008
( � 2500 '
10 28. AM
_t._ _I i 1 1--L ..1.. _.1--t
Span 1 Span 2
Service Combination. 1 *DL+1 *LL+1 *PT Strength Combination 1 4*DL+1 7*LL+1 *PH
t ADAPT-PT
i
l e J CONCRETE SHALL BE T'c-4WD PM ABDWUAI MIH 3/B'AGGREGATE
IY VnMI Gri OF FORM ACCEPTABLE
2 GROUr SNAIL BE MASTBUZOW SOD Or MASTER BUILDERS OR
AT 8"WALL g MAX APPRMED EQUAL
AT 8'
I 3 REMOVE UNSOUND AND t0o6E Cp+(AETE AROUND AND BELOW 71AE
BEAK
4. 1HORWfYp.Y CLEAN CONCRETE SURFACE AND APPLY BONWNG AGANT.
`J e • • • • • • • M XI S DRILL AND EPDXY DONEES AND WSTALL REMFOROEMENT.
p J EPDXY DOMEL
4'-D' 1 EMBED B'(4'MW
A MHERE Nor POSMA) A
A/- /�•YAX A/-
PLAN
SCALE 3/4•-1'-0'
1
6 PBJ m
Y y-o•
I I PLAZA EL 21•-7- 1
A4
4
�4 4 i e
c { a
0
4 1
14' Yf DRYPACK WIH 4S GROUT UNDER AB
• • • • AND BEAM
1 1
PB3
I I
012*-4'DDVAM OARED
• • 4'YATCH EVERY ODER
VERT BAR
I
L GRADE SAB
' •1 4 j EL 70-d
p J DGMEL 1
T1P �
m
ELEVATION SECTION �p
SCAM 3/4'-T'-D• 1-O•
w
=14 ' aDamuN6.INC •¢r un
/ cs••A••srr•..AIl1w W�w•r PORT ANGELES INTERNATIONALfan �s+4
awwk AX rro, GATEWAY TRANSPORTATION CENTER
' ~� REPAIR AT P83
n-'-m
14
?I
Seattle 41l.ii-ilst Avenue,.Suke 620--Seattle,WA 98 10� id:206;292:5076
Tacbms 9501ticific.Avchttc,Stiitd1,100 TiconiajVA98402 tel:253.3I3.3.2797
vo.vvv.pGs-blructura(coln
November 10, 2008
Krei.Architecture.
c/o Parametrix
2102 N Pearl Street, Suite.301
Tacoma, WA 98406
ATTN Stan Cruse
RE. Port Angeles International Gateway— Plaza Deck Review
bear Stan.
We have reviewed the solution to address the delamination area under PB3 proposed by Bright
Engineering and find it•structurally acceptable. We reviewed the drawings provided to us and
sp6 ke with Ade Bright about the solution. In our conversation we shared,a recent experience
we had With shallow embed depths.f6r epoxy anchors and:recommended using 6-inch
embedment where possible Additional embedment lengths may help reduce potential cracking
p
at this area that-could be caused by futureconcrete shrink i
shrinkage thermal cycles.
Thank,you for the opportunity to.be of service Please.co.ntact..us if you have any questions.
'Very.truly yours,
PCS STRUCTURAL SOLUTIONS
Paul J Brienen S E.
Principal
PJBvmm
09-058
v Ar
N�ftj-
9068 Itr.11-10-0.8 pjb
t= ._ . f YNIi: NGRTNG .'
c . ..
'. ?is;.; 'Us? r. `+ " •,s�.
` r��� � 301 East 6th Street,Suite 1
& ASSOCIATES �J �— Port Angeles,Washmgton 98362
I N C O R P O R A T E D
�. (360)417-0501
��— Fax(360)417-0514
E-mail:zenovic@olympus.net
November 6, 2008
Jim Lierly
Bu /_ O0 ���^ RECEIVED
Building Inspector (..-
City of Port Angeles Department of Community evelopment
321 East Fifth StreetNQ� 0 7 2008
Port Angeles, WA 98362
CITY OF PONT ANGELES
SUBJECT Port Angeles International Gateway BUILDING DIVISION
Dear Mr Lierly
I have reviewed the response letter from Ade Bright dated October 28, 2008 concerning building
inspector's letter and meeting notes/outline notes of October 7 2008. His response letter does
not adequately address all the issues in the outline and is not acceptable to this office. It should
be noted that Ade does not appear to have all my comments in the outline and he should include
all my comments in his response. I will not provide a complete review of his letter but will
highlight the following portions (see outline for item numbers):
Item 1 B ) Details not provided to clarify issue of bearing with reduction in wall width to
5' due to spalling.
Item 1 D) In meeting Ade appeared to indicate that loads do not include live loads
Item 2, C)Cause of cracks and construction loads not completely addressed
Item 3, A) Reason for cracks to be addressed Ade to address this issue and comment
that design was performed by others. Provide his approval and review of the
design, including shop drawings and structural calculations
Ade should provide a complete response to the items in the outline and should provide
calculations where necessary to justify his responses.
Also reviewed at this time is a letter dated October 20 2008 by Ingo Goller of Exeltech which
agrees with my opinion that Ade has not completely and specifically addressed the issues noted
in the outline. Ingo s letter also contains several items related to the design which may be
possible causes of the spalling/delamination and cracking that must also be addressed by Bright
Engineering as part of his response.
A third letter by PCS Structural Solutions was also reviewed by this office.This letter does
discuss possible causes of the various cracking but appears to be only a cursory review as is
noted in the letter It does bring up a discrepancy concerning the actual superimposed dead load
on the structure It is noted that Ade used a 150 psf superimposed dead load on the deck while
PCS.indicates a 50 psf superimposed dead load more accurately represents the loading on the
deck. This discrepancy shall be addressed by Ade including what affect this would have on the
design of the structure since the dead load is less than he figured and thus would affect the
camber in the PT beams and what PT load was specified in the design. It shall be noted that the
letter from PCS is not considered by this office to be an independent third party review of the
design and is only cursory in nature.
The issues noted above must be addressed prior to final acceptance of any proposed structural
repairs That said this office is willing to allow construction activities to continue with the
placement of the topping slab to complete loading of the deck provided the following conditions
are met:
�7
Page 2,
November 6, 2008
Gateway Project
1) Shoring under PB3 shall be provided to protect against catastrophic failure of the
structure prior to allowing placement of the topping slab This shoring shall be
designed by a structural engineer licensed in the State of Washington The shoring
shall be designed in such a way to allowing the beam to move under the increased
dead loads created by the addition of the topping slab without affecting the load path
on the beam
2) A monitoring program shall be developed and approved to monitor the deflection in
the beam as it is loaded as well as monitor the cracks in P134 during loading by
placement of the topping slab
3) The monitoring program shall be developed by experts in the field and shall be
initiated prior to placement of the topping slab with ample time to develop a baseline
to account for movements due to temperature.
Once items 1-3 have rbeen adequately addressed, the contractor may place the final topping slab
It shall be noted that placement of the final topping slab does not constitute an approval of the
previous issues or the additional issues by PCS or Ingo which must be addressed prior to the
approval of any proposed structural repairs to address the spalling/delamination or cracking. Any
proposed structural repairs shall be submitted and approved prior to beginning any repair work.
Please be reminded that the building shall not be occupied until all design questions have been
answered and any required repairs have been designed, approved and completed to the
satisfaction of the City of Port Angeles Building Department.
Please call me if yo hav any questions on this matter
Sincerely
I
udgel, P E.
Fc: JN 080911 01
�'s j arm
RE�Gtis�`
�0�SS1011
CML ENGINEERING
LAND SURVEYING
ENQV
& ASSOCIATES 301 East 6th Street,Suite 1
Port Angeles,Washmgton 98362
1 N C 0 R P 0 R A T E D (360)417-0501
Fax(360)417-0514
1P11E E-mail:zenovic@olympus.net
November 6, 2008
Jim Lierly
Bu RECEIVED
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street NOV 0 7 2008
Port Angeles, WA 98362 f�
CITY OF PORT ANGELES
SUBJECT Port Angeles International Gateway I BUILDING DIVISION
Dear Mr Lierly
I have reviewed the response letter from Ade Bright dated October 28, 2008 concerning building
inspector's letter and meeting notes/outline notes of October 7 2008. His response letter does
not adequately address all the issues in the outline and is not acceptable to this office It should
be noted that Ade does not appear to have all my comments in the outline and he should include
all my comments in his response. I will not provide a complete review of his letter but will
highlight the following portions (see outline for item numbers)-
Item 1 B ) Details not provided to clarify issue of bearing with reduction in wall width to
5' due to spalling.
Item 1 D) In meeting Ade appeared to indicate that loads do not include live loads
Item 2, C)Cause of cracks and construction loads not completely addressed
Item 3, A) Reason for cracks to be addressed Ade to address this issue and comment
that design was performed by others. Provide his approval and review of the
design including shop drawings and structural calculations
Ade should provide a complete response to the items in the outline and should provide
calculations where necessary to justify his responses
Also reviewed at this time is a letter dated October 20 2008 by Ingo Goller of Exeltech which
agrees with my opinion that Ade has not completely and specifically addressed the issues noted
in the outline. Ingo's letter also contains several items related to the design which may be
possible causes of the spalling/delamination and cracking that must also be addressed by Bright
Engineering as part of his response.
A third letter by PCS Structural Solutions was also reviewed by this office: This letter does
discuss possible causes of the various cracking but appears to be only a cursory review as is
noted in the letter It does bring up a discrepancy concerning the actual superimposed dead load
on the structure It is noted that Ade used a 150 psf superimposed dead load on the deck while
PCS indicates a 50 psf superimposed dead load more accurately represents the loading on the
deck. This discrepancy shall be addressed by Ade including what affect this would have on the
design of the structure since the dead load is less than he figured and thus would affect the
camber in the PT beams and what PT load was specified in the design It shall be noted that the
letter from PCS is not considered by this office to be an independent third party review of the
design and is only cursory in nature.
The issues noted above must be addressed prior to final acceptance of any proposed structural
repairs That said, this office is willing to allow construction activities to continue with the
placement of the topping slab to complete loading of the deck provided the following conditions
are met:
Page 2,
November 6, 2008
Gateway Project
1) Shoring under PB3 shall be provided to protect against catastrophic failure of the
structure prior to allowing placement of the topping slab This shoring shall be
designed by a structural engineer licensed in the State of Washington. The shoring
shall be designed in such a way to allowing the beam to move under the increased
dead loads created by the addition of the topping slab without affecting the load path
on the beam
2) A monitoring program shall be developed and approved to monitor the deflection in
the beam as it is loaded as well as monitor the cracks in PB4 during loading by
placement of the topping slab
3) The monitoring program shall be developed by experts in the field and shall be
initiated prior to placement of the topping slab with ample time to develop a baseline
to account for movements due to temperature
Once items 1 3 have been adequately addressed, the contractor may place the final topping slab
It shall be noted that placement of the final topping slab does not constitute an approval of the
previous issues or the additional issues by PCS or Ingo which must be addressed prior to the
approval of any proposed structural repairs to address the spalling/delamination or cracking. Any
proposed structural repairs shall be submitted and approved prior to beginning any repair work.
Please be reminded that the building shall not be occupied until all design questions have been
answered and any required repairs have been designed, approved and completed to the
satisfaction of the City of Port Angeles Building Department.
Please call me if yo hav any questions on this matter
Sincerely
I
udgel, P E.
Fc: JN 08091 1 01
' ESSW��
1 NGELES,
W �.. WASHINGTON U S A
PUBLIC WORKS & UTILITIES DEPARTMENT
Date- November 3 2008
To Nathan West, Director of Community Development
From. Jim Mahlum, Civil Engmee %-..-
Subject: Gateway Project—Krei's letter of response to delamination issue
Attached are two letters from Krei Architect, responding to the request by the Community
Development Department concerning the delamination that has occurred at the Gateway project.
The first letter is Ade Bright's response which includes a partial agreed outline of the meeting that
occurred on October 7, 2008 I have reviewed this letter and it is my opinion that not all the issues
have been addressed that had been asked to by the Building Inspector Letter and Meeting Notes.
(Full meeting outline is also attached)
On October 16, 2008 we received a draft letter,which I reviewed as well as Exeltech. On October
20, I sent Krei an email indicating my concerns that the letter did not fully address the issues agreed
upon in the joint meeting. Attached to that email was Exeltech's letter outlining their review of the
draft letter and another copy of the minutes from the jiomt meeting. (A copy of that letter is attached.)
Krei Architecture has independently hired PCS Structural Solutions to do a review of Ade's design
and calculations for the Gateway structure This second letter is from Paul Brienen, S.E. the principal
of PCS Structural Solutions. This letter does indicate that they have done some evaluations of the
calculations and have determined that the deck is ready to load, with some engineered shoring
installed prior to the loading of the deck.
While I have some reservation of these letters, I have been asked by Krei Architect to forward these
to your office for review and comments.
CC Exeltech
Clallam Transit
N\PROJECTS\97 20 Gateway\26 Claims&Liens\delamination 10-28-08 letter forwarded to CED.doc
1
u
PUS
Structural Solutions
Seattle 811 First Avenue,Suite 620 Seattle,IVA 913104 tel:206.292.5076
Tacoma 950 Pacific Avenue,Suite 1100 Tacoma,WA 98402 tel:253 383.2797
"Nm.pcs-strucrival.com
October 31 2008
Krei Architecture
c/o Parametrix
2102 N Pearl Street, Suite 301
Tacoma WA 98406
ATTN Stan Cruse
RE. Port Angeles International Gateway—Plaza Deck Review
Dear Stan.
We have completed our review of the plaza deck cracking wall delamination, and cursory
review of the structural design. It is our conclusion that beam PB3 near Grid B-8 should be
shored until the final fix is in place and capable of supporting the beam reaction. Due to the
significant loss in bearing area from the delamination of the wall we cannot conclusively
determine if sufficient beam support exists at this location We found no additional items that
would prevent the immediate build out of the deck to commence
It is our professional opinion the primary cause of the wall delamination is due to concrete
shrinkage although an initial wall crack may have occurred at the time of stressing and grew
over time as the concrete shrank. Damage caused by the shrinkage was concentrated near
Grid B-8 due to the restraint provided by the adjacent skewed wall and south basement wall
We reviewed the concrete mix design used on the deck and would classify it as a low-shrink
mix. We estimate the total reduction in length due to shrinkage at 28-days to be approximately
3/8 to Y2 inches We estimate up to an additional 1/4-inch of shrinkage could take place over
the next couple of years
Deck and beam cracks in our opinion, are also the result of shrinkage and appear to be minor
We do not recommend remedial action unless they open up beyond 0 012-inches in width
Diagonal wall cracks were likely caused by a combination of surcharge of the wall by
construction machinery wall shrinkage the beam block out (re-entrant corner) and shrinkage of
the deck. We do not recommend remedial action unless water seepage becomes noticeable
through these cracks.
In our cursory review of the deck design we reviewed the calculations performed by the
structural engineer of record and performed calculations of our own. The submitted calculations
included only a summary of the post-tension design results it did not include geometry
deflections or resulting stresses for these elements. Thus we could not determine the
adequacy of the post-tension design by reviewing the submitted calculations We analyzed the
beam along Grid B and a typical slab span In both cases we found the designs to be
t •
FL
Structural Solutions
Krei Architecture
Stan Cruse
Port Angeles International Gateway— Plaza Deck Review
structurally adequate with respect to the building code We expect if we were to analyze the
rest of the beams and deck spans they too would be adequate although we have not done this.
Itis important to note that a hand drawn load diagram in the calculations indicated a 150-psf
superimposed dead load on the deck. After reviewing the construction documents and
speaking with Stan Cruse we determined a 50-psf superimposed dead load more accurately
represents the loading on the deck and was used in our analysis along with planter loading and
live loading
We will review the proposed fix for the delamination below the wall when it is submitted to us.
Thank you for the opportunity to be of service Please contact us if you have any questions.
Very truly yours,
PCS STRUCTURAL SOLUTIONS
Paul J Brienen, S E.
Principal
PJBvmm . 81tr ''r
09-058q �g
32114
AL
ST NAL
9058fr 10-30-08,pjb
ORT
T NGELES
P A
f4
W A S H I N G T O N U S A
MEWA Public Works & Utilities Department
October 30 2008
James Dugan
Owners Representative Services
Division Manager
Parametrix, Inc
2102 N Pearl Street, Suite 301
Tacoma, WA 98406
RE International Gateway Project, Delamination Letter
Dear Jam
I have reviewed the revised response letter to the Building Inspector Letter and Meeting
Notes. It appears that the letter has not addressed all of the issues that had been asked to be
addressed. On October 9, 2008 we had ajomt meeting with the Building Official and
Inspector, their representative, Exeltech, Clallam Transit, Stan Cruise, Ade Bright and
myself. On October 10, 2008 final minutes of that point meeting were sent to your office for
guidance and requirements of items that needed to be addressed in the letter These minutes
were reviewed by all and were to be the basis of the letter from Ade Bright.
On October 16, 2008 we received a draft letteri which I reviewed as well as Exeltech. On
October 20, I sent you an email indicating my concerns that the letter did not fully address
the issues agreed upon in the point meeting. Attached to that email was Exeltech s letter
outlining their review of the draft letter and another copy of the minutes from the point
meeting.
I am now requesting that you make specific written recommendations to resolve this issue.
Time is of the essence, as per my separate letter to you dated October 29, 2008, wherein you
were put on notice that contract delays are occurring that are directly attributable to this
issue
Sincerely
J mes M Mahlum
P 3
ect Manager
CC Clallam Transit
Exeltech
Phone 360-417-4805 /Fax 360-417-4542
.hh\P.ROJECTS\97 20 Cjate a X26 Cj s&.�iens\i�28-08 diel ination letter.doc
e Sl e www a yorpa.us/tMi pub icwor s ci yofpa.us
321 East Fifth Street P 0 Box 1150 / Port Angeles WA 98362-0217
318/318R-166 CHAPTER 11
CODE COMMENTARY
tendon in each corner of the stirrups. Bars shall have a for torsion should approximately coincide with the centroid
diameter at least 0.042 times the stirrup spacing, but of the section. The code accomplishes this by requiring the _ <
not less than a No 3 bar longitudinal torsional reinforcement to be distributed '
around the perimeter of the closed stirrups. Longitudinal
bars or tendons are required in each corner of the stirrups to
provide anchorage for the legs of the stirrups. Corner bars
have also been found to be very effective in developing for
sional strength and in controlling cracks.
11.6.6.3—Torsion reinforcement shall be provided R11.6.6.3—The distance(bt.+d)beyond the point theo-
for a distance of at least b + d) beyond the point the- retically required for torsional reinforcement is larger than
oretieall ulred. that used for shear and flexural reinforcement because for ='
sional diagonal tension cracks develop in a helical form.
117— Shear-friction R11.7—Shear-friction
1171 -1 '_ h : t R11.7.1 — With the exception of 11 7 virtually all provi-
sions regarding shear are intended to prevent diagonal ten-
sion failures rather than direct shear transfer failures. The
® Ce purpose of 117 is to provide design methods for conditions
where shear transfer should be considered: an interface `
between concretes cast at different times, an interface
between concrete and steel,reinforcement details for precast
concrete structures, and other situations where it is consid-
ered appropriate to investigate shear transfer across a plane
I in structural concrete.(See References 11.35 and 11.36.)
11 7.2 — Design of cross sections subject to shear
transfer as described in 11 7 1 shall be based on Eq.
(11 1) where V„is calculated in accordance with pro-
visions of 11 7.3 or 11 7 4
11 7.3—A crack shall be assumed to occur along the R11.7.3 — Although uncracked concrete is relatively
shear plane considered. The required area of shear strong in direct shear there is always the possibility that a
friction reinforcement Af across the shear plane shall crack will form in an unfavorable location. The shear-fric-
be designed using either 11 7 4 or any other shear tion concept assumes that such a crack will form, and that
transfer design methods that result in prediction of reinforcement must be provided across the crack to resist
strength in substantial agreement with results of com- relative displacement along it. When shear acts along a
prehensive tests. crack, one crack face slips relative to the other If the crack
faces are rough and irregular this slip is accompanied by
11 7.3.1 —Provisions of 11 7.5 through 11 7 10 shall separation of the crack faces. At ultimate, the separation is
apply for all calculations of shear transfer strength. sufficient to stress the reinforcement crossing the crack to
its yield point.The reinforcement provides a clamping force
A,ffy across the crack faces. The applied shear is then
resisted by friction between the crack faces,by resistance to
the shearing off of protrusions on the crack faces, and by a
dowel action of the reinforcement crossing the crack. Sue
cessful application of 117 depends on proper selection of
the location of an assumed crack.l l �s>113s
The relationship between shear-transfer strength and the
reinforcement crossing the shear plane can be expressed in I
various ways. Eq. (I1 25) and (11 26) of 117 4 are based
on the shear friction model This gives a conservative pre
diction of shear-transfer strength. Other relationships that
I give a closer estimare of shear transfer strength'1.18,11.37 1 A
can be used under the proves)ons of 11 7.3 For example,
ACI 318 Building Code and Commentary
CHAPTER 11 3181318R-167
CODE COMMENTARY
when the shear-friction reinforcement is perpendicular to
y the shear plane,the shear strength V„is given by 11.37,11.38
Vn=0.8A,ffy+A�KI
where A, is the area of concrete section resisting shear
transfer (in?) and Kl =400 psi for normalweight concrete,
200 psi for all-lightweight concrete, and 250 psi for sand-
lightweight concrete. These values of Kl apply to both
monolithically cast concrete and to concrete cast against
hardened concrete with a rough surface, as defined in
117.9
In this equation,the first term represents the contribution of
friction to shear-transfer resistance (0.8 representing the
coefficient of friction). The second term represents the sum
of the resistance to shearing of protrusions on the crack
faces and the dowel action of the reinforcement.
When the shear-friction reinforcement is inclined to the
shear plane, such that the shear force produces tension in
that reinforcement,the shear strength Vn is given by
Vn=A,ffy(0.8 sinal+cosaf)+A�Ktsin2af
where of is the angle between the shear friction reinforce-
ment and the shear plane,(i.e.0<of<90 deg).
When using the modified shear-friction method, the terms
(A,,ffy/A,)or(A,ffy sin a f/A,) should not be less than 200
psi for the design equations to be valid.
117 4—Shear-friction design method R11.7.4—Shear-friction design method
117 4.1 — When shear-friction reinforcement is R11.7.4.1 — The required area of shear-transfer rein-
perpendicular to the shear plane, shear strength V„ forcementA„fis computed using N
shall be computed by
Vu
Vn=Avf fyµ (11-25) A"f _ v µ
y
i
where µ is coefficient of friction in accordance with I The specified upper limit on shear strength should also be
1174.3. observed.
11 7.4.2 — When shear-friction reinforcement is R11.7.4.2 — When the shear-friction reinforcement is
inclined to the shear plane such that the shear force inclined to the shear plane, such that the component of the
produces tension in shear-friction reinforcement, shear force parallel to the reinforcement tends to produce
shear strength V„shall be computed by tension in the reinforcement, as shown in Fig. R11 7 4 part
of the—shear is resisted by the component parallel to the
Vn=Avf fy(µsin af+cos af) (11-26) I shear plane of the tension force in the reinforcement.'138
Eq. (11 26)should be used only when the shear force com-
ponent parallel to the reinforcement produces tension in the
where alis angle between shear-friction reinforcement reinforcement, as shown in Fig.R11 7 4 When of is greater
and shear plane than 90 deg, the relative movement of the surfaces tends to
compress the bar and Eq.(11 26)Is not valid.
ACI 318 Building Code and Commentary
318/3188-168 CHAPTER 11
CODE COMMENTARY
Assumed crack
and shear plane
Applied shear
pp
V.
A
and n
s
d
nine
shear d
rc
p
Applied shear
V
,_—Shear friction
r
reinforcement,AV
af
Fig. R11 74—Shear-friction reinforcement at an angle to
assumed crack
11 7 4.3 The coefficient of friction in Eq. (11 R11.7.4.3 In the shear-friction method of calculation,
25) and Eq. (11 26) shall be it is assumed that all the shear resistance is due to the fric
tion between the crack faces. It is, therefore, necessary to
Concrete placed monolithically 1.41 use artificially high values of the coefficient of friction in
the shear-friction equations so that the calculated shear
Concrete placed against hardened con- strength will be in reasonable agreement with test results.
trete with surface intentionally roughened For concrete cast against hardened concrete not roughened
as specified in 11 7.9 1.01 in accordance with 117.9 shear resistance is primarily due
to dowel action of the reinforcement and tests"-'9 indicate
Concrete placed against hardened that reduced value of 0.61 specified for this case is
concrete not intentionally roughened 0.61 appropriate.
Concrete anchored to as-rolled structural The value of yfor concrete placed against as-rolled stAic
steel by headed studs or by tural steel relates to the design of connections between pre
reinforcing bars (see 11 7 10) 0.7A cast concrete members,or between structural steel members
and structural,concrete members. The shear-transfer rein-
where A = 1.0 for normalweight concrete, 0.85 for forcement may be either reinforcing bars or headed stud
sand-lightweight concrete and 0 75 for all lightweight shear connectors; also, field welding to steel plates after
concrete Linear interpolation shall be permitted when casting of concrete is common.The design of shear connec
partial sand replacement is used. tors for composite action of concrete slabs and steel beams
is not covered by these provisions, but should be in accor
dance with Reference 1140.
11 7.5 Shear strength V,shall not be taken greater R11.7.5 — This upper limit on shear strength is specified
than 0.2f,,A,nor 800AC in lb, where Ac is area of con- because Eq. (11 25) and (11 26) become unconservative if
crete section resisting shear transfer V,,has a greater value.
117.6 — Design yield strength of shear-friction rein-
forcement shall not exceed 60,000 psi.
CHAPTER 11 318/318R-169
CODE COMMENTARY
11 7 7 — Net tension across shear plane shall be R11.7 7 — If a resultant tensile force acts across a shear
resisted by additional reinforcement. Permanent net plane, reinforcement to carry that tension should be pro-
compression across shear plane shall be permitted to vided in addition to that provided for shear transfer.Tension
be taken as additive to the force in the shear-friction may be caused by restraint of deformations due to tempera-
reinforcement A„f fy when calculating requiredA„f. ture change, creep, and shrinkage. Such tensile forces have
caused failures,particularly in beam bearings.
When moment acts on a shear plane, the flexural tension
stresses and flexural compression stresses are in equilib-
rium.There is no change in the resultant compression Avffy
acting across the shear plane and the shear-transfer strength
is not changed.It is therefore not necessary to provide addi-
tional reinforcement to resist the flexural tension stresses,
unless the required flexural tension reinforcement exceeds
the amount of shear-transfer reinforcement provided in the
flexural tension zone. This has been demonstrated experi-
I mentally 1141
It has also been demonstrated experimentallyt1.36 that if a
resultant compressive force acts across a shear plane, the
shear-transfer strength is a function of the sum of the result-
ant compressive force and the force A,,ffy in the shear-fric
tion reinforcement.In design, advantage should be taken of
the existence of a compressive force across the shear plane
to reduce the amount of shear-friction reinforcement
required, only if it is certain that the compressive force is
permanent.
Shear-friction reinforcement shall be appro- R11.7.8—If no moment acts across the shear plane, rein-
R priate y placed along the shear plane and shall be forcement should be uniformly distributed along the shear
anchored to develop the specified yield strength on plane to minimize crack widths.If a moment acts across the
shear plane, it-is desirable to distribute the shear-transfer
both sides by embedment, hooks, or welding to spe-
tial devices. reinforcement primarily in the flexural tension zone.
Since the shear-friction reinforcement acts in tension, it
€ should have full tensile anchorage on both sides of the shear
plane. Further, the shear friction reinforcement anchorage
i should engage the primary reinforcement, otherwise a
i potential crack may pass between the shear-friction rein-
forcement and the body of the concrete. This requirement
applies particularly to welded headed studs used with steel
r inserts for connections in precast and cast-in-place concrete.
Anchorage may be developed by bond, by a welded
mechanical anchorage, or by threaded dowels and screw
inserts. Space limitations often require a welded mechanical
anchorage. For anchorage of headed studs in concrete see
Reference 11 18.
z
11 7.9 — For the purpose of 11 7 when concrete is
placed against previously hardened concrete the
Interface for shear transfer shall be clean and free of
laitance If µ is assumed equal to 1.0;,, interface
shall be roughened to a full amplitude of approxi-
F
mately 1/4 in
a
ACI 318 Building Code and Commentary
a:
• 318/318R-170 CHAPTER 11
1 CODE COMMENTARY
11 710 — When shear is transferred between as-
rolled steel and concrete using headed studs or
welded reinforcing bars, steel shall be clean and free
of paint.
s�
11.8— Deep beams I R11.8—Deep beams
11.8.1 —The provisions.of 11.8 shall apply to members R11.8.1 — The behavior of a deep beam is discussed in
with clear spans,t,,, equal to or less than four times the I References 11.5 and. 11.38. For a deep beam supporting `l
overall member depth or regions of beams loaded with ,gravity loads,this section applies if the loads are applied on
j concentrated loads within twice the member depth, the top of the beam and the beam is supported on its bottom
from the support that are loaded on one face and sup- face. If the loads are applied through the sides or bottom of
ported on the opposite face so that compression struts such a member the design for shear should be the same as
can develop between the loads and supports. See also for ordinary beams.
12.10.6
The longitudinal reinforcement in deep beams should be
extended to the supports and adequately anchored byK
Iembedment, hooks, or welding to special devices. Bent-up s
bars are not recommended.
w�
11.8.2—Deep beams shall be designed using either R11.8.2—Deep beams can be designed using strut-and-tie
nonlinear analysis as permitted in 10 7 1 or Appen- models, regardless of how they are loaded and supported.
dix A. Section 10 7 1 allows the use of nonlinear stress fields when k'
proportioning deep beams. Such analyses should consider
the effects of cracking on the stress distribution.
11.8.3— Shear strength V„for deep beams shall not R11.8.3 — In the 1999 and earlier codes, a sliding maxi-
exceed 10 f,bN,d. mum shear strength was specified. A re-examination of the
test data suggests that this strength limit was derived from '
tests in which the beams failed due to crushing of support
regions. This possibility is specifically addressed in the
design process specified in this code.
11.8.4—The area of shear reinforcement perpendic R11.8A and R11.8.5—The relative amounts of horizontal
ular to the span, Av, shall not be less than 0.0025bws, and vertical shear reinforcement have been interchanged
and s shall not exceed d/5, nor 12 in.
from those required in the 1999 and earlier codes because
tests 11 42,11 43,1144 have shown that vertical shear reinforce-
11.8.5 — The area of shear reinforcement parallel to ment is more effective than horizontal shear reinforcement.
the span, Ah shall not be less than 0.0015bws2, and The maximum spacing of bars has been reduced from 18 in.
s2 shall not exceed d/5, nor 12 in. to 12 in. because this steel is provided to restrain the width
of the cracks.
11.8.6—It shall be permitted to provide reinforcement
satisfying A.3.3 instead of the minimum horizontal and
vertical reinforcement specified in 11.8.4 and 11.8.5.
ACI 318 BuildingCode and Commentary i
rY
ORT NGELES
A'
A 'S H I N G T O "N, U S A.
Community & Economic Development Department
2
October9, 2008
Pnmo Construction
Ms. Jennifer Howell
j 97.0 Carlsborg Road
Sequim, WA 983.82
RE Port Angeles International Gateway—West Parking Garage
Dear Jennifer-
The City received your letter of October 16, referencing the City's letter dated October 2,
2008, addressing issues of concern in construction of the west parking garage structure of the.
City's Port Angeles International Gateway_project. Since that writing, a letter was provided
to you from Zenovic &Associates, dated September 29, 2008, on behalf of the City, that
identified specific issues of concern that to date have not been completely addressed. The
specific issues identified m.the Zenovic & Associates letter must be addressed by the
i
contractor prior to:final inspection of the structure:
s
4
The City supports, and wo like to reiterate, the concerns outlined in the attached October
28, 2008 letter from Zen vic &Ass crates. Please feel free to contact me.if you have any
questions regarding thi atter
i
Sincerely
I
I Jim Li y
I Buildg.Inspector
I Attachment: 10/28/08 Zenovic&Associates letter
Cc Nathan West
Sue Roberds
Jim Whlum
I
9
i
Phone 360-417-4750/Fax: 360-417-4711
i Website wwwcityofpcj.us/Email smartgrowth@cityofpa.us
321 East'Fifth Street PO Box 1150/Port Angeles WA 98362-0217
CML ENGINEERING
�T LAND SURVEYING
2E�1�
IN O V I C. 301 East 6th Street,Suite 1
& ASSOCIATES Port Angeles,Washtngton 98362
I N C O R P O R A T E D
(360)417-0501
October 28 2008 Fax(360)417-0514
E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway—West Parking Garage FILE
Dear Mr Lierly
This office has reviewed the letter dated October 16 2008 from Jennifer Howell of Primo
Construction Inc. and an attached letter dated September 22, 2008 from Robert
Bourdages of Poggemeyer Design Group The letter from Poggemeyer was written prior
to the letter from this office and does not completely address the issues of my letter of
September 29 2008 It is requested that the engineer for the parking garage specifically
address the issues noted in my letter
Since my letter references the plans, an exhibit showing crack location and migration
and photos taken at the time of my inspection I see no reason to reference the
calculations in my letter The documentation provided is adequate for the engineer to
identify the areas of concern
Please call me if you have any further questions on this matter
Sincerely
O
3_0 r�'A
Tracy Gudgel P E.
X181
Fc: JN 08091 pFWAS
2111
s
SIONN.
U
CITY OF pQRT ANGELES
Dept.of Community Development
-P-right �;nginee-ring nc Consulting Structural and Civil Engineering
October 28, 2008 BEI# 116.03R
Parametrix,Inc
Attn. Stan Cruse,Project Manager
2102 N Pearl Street, Suite 301
Tacoma,WA 98406
RE. PORT ANGELES INTERNATIONAL GATEWAY
Response to Building Inspector Letter and Meeting Notes
Dear Stan.
The following is our response to the Building Inspector's letter and meeting notes of October 7 2008 In
preparing these responses, we have reviewed copies of Inspectors Daily Report,Testing Agency Reports,
available construction photographs, shop drawings, site visit reports, design documents, and calculation
checks, as well as interviews with the CM personnel.
Text in bold represent comments from the Building Department,the italicized text below it were taken
from the October 7'h meeting minutes, and following these items are the BEI responses.
Item 1.
A. Address adequate reinforcing to handle reduction in bearing from spalling.
Beam Bearing has shifted to the east due to spalling under the bearing seat Post Tension anchor
block out does not extend deep enough into beam to pose a shear cracking risk. A detail shall be
provided.
B. Account for buck out at stressing end.
Ade Bright indicated the calculations show the bearing is less then S inches.
Tracy Gudgel was concerned about how the bock out for the stressing cones figured in on the
bearing condition (drew sketch on board). Ade Bright and Ingo Goller indicated that the bearing
condition was full height on the back side of the wall. Ade was willing to show Tracy the actual
details Ingo indicated they had construction photos to confirm.
Response to A and B.
As shown in Photo A 1 on our site visit reported dated March 19 2008 PT beams bear over the entire
width of the wall,but with pocket to accommodate PT trumpet and cap
180Q 7"' A 1100 1 S..Ul. \YYA 9801-381 1 pkv 2o6.6251777 1 f, 206 625 X851 I nfo�d bright<_ng.om
Mr Stan Cruse,AIA,LEEDv.2 AP
October 28,2008
Page 2 of 9
Our calculation show that the bearing stress under the beam is satisfactory under the addition of all
permanent dead loads i.e topping and pavers, as previously stated. ,
To our knowledge, neither we,the CM or the contractor has observed or reported any shift in the beam
C. Calculations and sketch to show combination of buck out and spalling do not compromise
beam bearing.
D. Clarify the ultimate dead load factory of safety requirement.
Ultimate dead load includes a 1.2 Load Factor The calculations for the ultimate dead load
included the dead loads and the live load.
Response to C and D:
As stated in my last letter the minimum bearing width under ultimate dead load is under 5' Live load
accounts for 25% of total ultimate load and by the time live load is applied,repair of spall would have
been affected. Ultimate load by definition is 1.2DL+ 1 6LL.
Item 2.
A. Regarding cracking address reentrant corners considered in design.
Ade Bright considered the reentrant corner crack potential.
B. Was reinforcing added at reentrant corners to reduce cracking?
No reinforcing was added to mitigate the crack potential.
C. Address horizontal cracking, not just at corners
Ade addressed the construction sequencing request by Primo to backfill the wall, therefore a
wall support system was designed. The cracking is occurring at those lines.
It was also noted by Stan Cruse that the wall was backfilled and then the sheet piling was
removed with large equipment applying more forces than just the soil pressure.
Ingo Goller and Jim Mahlum noted that this was at the time in the drop in Lincoln Street
occurred.
Horizontal cracking was generated at the drilled holes, during installation of whalers to support
the wall during backfilling
6 Mr Stan Cruse,AIA,LEEDv.2 AP
October 28,2008
Page 3 of 9
D. Does proper vertical reinforcing eliminate horizontal cracks.
Ade will check his design for adequacy and provide references to the calculations A monitoring
plan will be developed to observe any possible movement.
E. Address 60 degree angle crack below PB3,not at reentrant corner
It will be reviewed infield.
F Provide calculations to justify
As a part of the field review will also review construction practices and sequences A review of
the calculations will be done and references given to this review
It was noted that sheet pile removal could be a factor
Response to Item A to F.
Photos B-1 and C 1 show the location of waler bracing the wall to allow backfill before the plaza deck
was placed. Wall was backfilled to dust below the bottom of PT beams, as shown in Photos
B-2,B-3 and B-4
The wall was designed for 60 pcf lateral soil pressure and 250 psf surcharge to account for construction
equipment or traffic As previously stated in our reports, and confirmed during our site visit of Oct. 7
2008,the horizontal cracks are in line with drilled-in concrete anchor location that supports the
temporary wall bracing and the bottom corner of the beam pockets. Maximum bending on the wall
occurs at mid-height and not at the location of the hairline cracks, where the stresses are much lower
Vertical as well as horizontal wall reinforcement at each face of the wall is satisfactory for the calculated
loads.
With regard to the 60°cracks,it was previously stated, and verified on the field, that the cracks emanate
from the reentrant corners of the beam pocket.
Item 3.
A. Address cause of vertical cracks in PB4.
This was addressed in Ade s September 2 report. No cause identified.
B. Variables addressed needs to determine whether the structure is sound.
Consider installing strain gauges prior to loading PT Deck.
Mr Stan Cruse,AIA,LEEDv.2 AP
October 28,2008
Page 4 of 9
C. Provide calculations to show cause of crack.
Temperature reinforcing to be viewed for adequacy and references provided to the calculations.
Response to A to C.
We have reviewed temperature reinforcement in the slab Continuous transverse bottom reinforcement
(perpendicular to PT)of#4 @ 12' was provided in this slab to account for temperature/shrinkage. This is
satisfactory
With regard to the hairline cracks running NS in the slab and through P134 and toward P136, when the
cracks first occurred is not known. It was confirmed by Exeltech that the plaza area was not used for
material stockpile or by construction vehicles, other than a scissors lift(photo D-1) It should be stated
that the crack pattern is not consistent with flexural or shear cracks. It appears that the cracks coincide
approximately with a PT tendon dead end about 24-ft. west of column line 6 PB6 to the north also has a
PT tendon dead end at the same location.The difference between the two beams is that PB3 has higher
PT force. The Cgs (center of gravity)of the PT strands are at the neutral axis of the concrete section,
which is about 1 -4' from top of slab/beam and 2 -8' from the bottom of beam.
At the end zones,PT force is transferred from the tendon to the concrete by bearing of the anchorages,
thus creating a tensile component in the transverse direction. The splitting force at the end zone of the
tendon, due to PT force, generates tensile forces, which may have contributed to this crack. However it
should be noted that PT shop drawings submittal calculated required reinforcement and show added mild
steel reinforcement around the tendon.Furthermore, since the PT ducts were grouted over their entire
length,hence,internal PT forces acting in the beams are transferred through bond and application of
external load will not increase forces on the anchorages.
It is our opinion that this crack was initiated by very high PT force in PB3 and exaggerated by
temperature-induced shrinkage.We have recommended affixing strain gages to the bottom of the beam
to monitor the crack as additional permanent loads are applied and as temperature changes.
Item 4.
A. Cause of cracking does not appear to be complete.
Ade maintains that due to isolated delamination condition, Shear friction is not a problem.
B. Cause does not account for all the variables.
C. Cause related to the project issues.
D. Cause related to post tensioning.
Mr Stan Cruse,AIA,LEEDv.2 AP
October 28,2008
Page 5 of 9
Response to A to D.
The diagonal wall,just south of PB3 which was a field change required during construction to prevent
loss of ground around the hydrant and light signal foundation.During this change, slab and beams
reinforcing as well as post tensioning forces in beams in this vicinity was revised to account for the
changes in loading and support condition.
The effect of the diagonal wall was considered but could not be easily negated. The restraint from this
wall appears to have exaggerated the spall under PB3 and to a lesser extent on the remaining beams
framing into the wall. It's restraint to the east wall prevented the east wall from rotating with the beam
when post tensioned as previously reported. Nevertheless,the total effective post tensioning force applies
to the beam. It should be noted that we did not observe any crack on the surface of the slab between the
beam and the diagonal wall.
Application of addition loads would induce rotation in the opposite direction.
Item 5.
A. Structural engineer has no reservations for placing the topping slab and pavers.
Ade recommends loading structure. Final approval to proceed, with loading the deck structure,
will be considered after a report addressing these issues is submitted and accepted. Repair
procedure to address delamination repair will be submitted prior to making repairs.
Response to Item A.
Again,it is still our position that the plaza may be loaded as designed.We have stated that proposed
repair conducted after application of all permanent loads, would consist of removing unsound concrete
and placing a concrete layer with positive anchorage into the existing walls. Proposed repair would be
submitted for review Until repair is made, we suggest that no further removal of concrete from under the
beam be made.
Please contact me if you have any questions.
Best regards, PQ of w.p,syi�c.y�
Ade J Bright,PE, SE -p: O8
AJB.klf
/klf
Mr Stan Cruse,AIA L Eav2AP
October 28 2008
Pg 609
It
« .
�
» �<
Photo A-1
« -
^
----------
Photo
Ph m B!
Mr Stan Cruse AIA LEEDv 2 AP
October 28,2008
Page 7 of 9
11/8/2007 12:37:39 PM Placing wall backfill between sheet pile and east wall of
plaza
Photo B-2
11/171200710.32:07 AM Displacement
partially due to pile extraction
_ f
Photo B-3
Mr Stan Cruse AIA LEEDv 2 AP
October 28,2008
Page 8 of 9
11/17/2007 10:31:46 AM Area of
pile removal note exposed inactive
waterline
Photo B-4
u:sa,
Photo C-1
6 Mr Stan Cruse AIA LEEDv 2 AP
October 28,2008
Page 9 of 9
�5��,� � � v �'4�'� ry�'�fwgN,�'s;r�a, .�, t i ss 4 < ,j� � � � s is k'r♦t 5 �
}r �.X 4 �'�,�.-�i.✓t� �Hr " i rir,+k }M a�r�' '� t 1 �
�A i+�st+ F tl k n`v� r i '"� r � �a >✓ n ��h -y1 a - b
�'� � �H,��, a Ik�•y.�r'H �t3 a�w.<!`z�`rfs `�1 f'�-.r+.,,.�t''. �'��r��..;3�o-�.$ ,v ,r,t � h'� �
Photo D-1
,,.1173/20 8'_-r--.-r.,--.:--,-,---,—.-,- ..._...
.--�->,1-D.---ra...._.ft..De�. i7.-- -.-.--nation-_--..._..T,-._T�_ .�._.-..-.-s,,-...->,.-�,--_.,—.,�.�........,...T. .�:.,,--.:_......,,__.......- ..._.'--,
Mahlum City's review of the Letter Page 1
From Jim Mahlum
To, Jim Dugan
Date: 10/20/2008 3 18 PM
Subject: City's review of the Draft Delamination Letter
Attachments: postmaster_cityofpa_us_20081020 pdf; Outline to 10-09-08 Delamination Meeti
ng.doc
CC. Glenn Cutler; igoller@xltech.com, tweed@clallamtransit.com
Jim,
I had some concerns about the proposed letter myself as I do not believe that the letter addresses the issue of the agreed
upon minutes and issues brought up,and documented in the joint meeting of October 9, 2008. As agreed in that meeting,
I have asked Exeltech to review the letter as well and attached is a letter from Ingo Goller outlining their review Please
have Ade Bright address more completely the issues brought up. Also as either provide the calculations or at the very least
provide references to any previous calculations the were provided. This has been asked time and time again, but nothing in
this order has been forthcoming. I am also attaching,once again,the agreed upon outline of the minutes. This outline
was established in order to have some guidelines for which to address all issues of concerns.
We,the City do not feel that all the issues have been addressed and therefore do not recommend sending this in final form
to the Building Official
If you have any questions please feel free to contact me.
Jim Mahlum
"10�
e x e I t e c h
October 20 2008 2590 Willamette Drive NE
Suite 101
Lacey WA 96516-1325
360.357 8289
Jim Mahlum Fax:360.357.8225
City of Port Angeles
325 East 4`h Street
Port Angeles WA 98362
Re Port Angeles International Gateway Transportation Center
Review of Delamination/Cracking Documents
Dear Jim:
As requested by the City Exeltech has reviewed both Zenovic&Associates (Z&A) letter
dated October 8, 2008 for five (5)items, including additional issues and Bright
Engineering, Inc.'s (BEI) response dated October 15 2008. As it is imperative that a
resolution is reached such that this project can move forward and minimize delay to the
contractor we agreed to help the city with our thoughts on what is important to focus on as
they reach a decision in this matter With the structural condition and failure that currently
exists in the field, namely spalled and delaminated concrete, cracks, etc. Z&A has
justifiably raised some concerns Z&A's concerns, albeit tangential and critical, are
generally valid. Unfortunately, BFI's response does not specifically and directly address
the concems raised by Z&A.
In order to specifically and more directly address some of the failure in the PT Slab/Wall
system we are suggesting that the following items be reviewed and addressed with both
Z&A and BEI:
• Several of the PT Beams (PB3 P84 PS5 and PB6A) have been subjected to
extremely high PT forces 1 160 Kips With the presumed rigid or fixed
connection for the beam-wall interface how is said fixed connection transmitting
these high PT forces into main body of the PT slab? (Structural calculations
should be provided to specifically address this issue)
• The presence of the blockout within the wall support width at the stressing end of
the PT Beams creates a bursting zone that is 5 to 7 inches wide. How are the
aforementioned high PT forces transmitted through said bursting zone? Should
there by additional transverse continuous distribution steel (to properly distribute
high PT forces) at the stressing end? (Structural calculations should be provided
to specifically address this issue.)
o To create fixity at the PT Beam/Wall interface (as the designer intended) should
the beam bottom steel (Two (2) No 9 Bars) be extended into the wall with 90
degree or 135 degree hooks? (Structural calculations should be provided to
specifically address this issue )
In order to expeditiously complete the construction of the Gateway Project, it becomes
imperative to accurately and conclusively identify the cause for the spalling and cracks in
the PT slab and the walls. It is our opinion that an independent and objective Structural
Engineer with considerable PT expertise be retained by COPA to assess the current
Engir,eer,ng Solut ons for a Changing Wo,1(
structural condition of the PT Slab and Walls, and identify causes for the spalled concrete
and cracks. This third party assessment should be presented to BEI to review accept
and/or refute
Regardless of the third party structural engineer's findings and BEI's position on these
findings, BEI should be directed to provide an interim repair design for the spalled and
delaminated concrete failure. Long term repair or acceptance of current structural
condition will be dependant on third party structural engineer's assessment.
Respectfully Submitted,
EX LTECH CONSULTING, INC
'41A
Ing oiler P.E.
Co traction Manager
cc: Nathan West, Building Official, City of Port Angeles
file
e
1 h
Zenovic & Associates, Incorporated Letter October 8, 2008
Items to Address.
Item 1
A. Address adequate reinforcing to handle reduction in bearing from spalling
Beam Bearing has shifted to the east due to spalling under the bearing seat Post
Tension anchor block out does not extend deep enough into beam to pose a shear
cracking risk. A detail shall be provided.
Detail to include how rebar terminates at end of beam.
B Account for buck out at stressing end.
Ade Bright indicated the calculations show the bearing is less then 5 inches.
Tracy Gudgel was concerned about how the bock out for the stressing cones figured in on
the bearing condition (drew sketch on board) Ade Bright and Ingo Goller indicated that
the bearing condition was full height on the back side of the wall. Ade was willing to
show Tracy the actual details. Ingo indicated they had construction photos to confirm.
Ade to provide details.
C Calculations and sketch to show combination of buck out and spalling do not
compromise beam bearing
I
D Clarify the ultimate dead load factory of safety requirement.
Ultimate dead load includes a 1.2 Load Factor The calculations for the ultimate
dead load included the dead loads and the live load.
I thought Ade said the calculation did not include the live load,please verify
Item 2
A. Regarding cracking address reentrant corners considered in design
Ade Bright considered the reentrant corner crack potential.
B Was reinforcing added at reentrant corners to reduce cracking?
No reinforcing was added to mitigate the crack potential
Outline to 10-09-10` Delami» tion Meeting.doc 1 of 7
C Address horizontal cracking, not just at corners
Ade addressed the construction sequencing request by Pnmo to backfill the wall,
therefore a wall support system was designed. The cracking is occurring at those
lines.
It was also noted by Stan Cruse that the wall was backfilled and then the sheet piling
was removed with large equipment applying more forces than just the soil pressure.
Ingo Goller and Jim Mahlum noted that this was at the time in the drop in Lincoln
Street occurred.
Ade is to address cause of cracks and address construction loading.
Horizontal cracking was generated at the drilled holes, during installation of
whalers to support the wall during backfilling.
D Does proper vertical reinforcing eliminate horizontal cracks
Ade will check his design for adequacy and provide references to the calculations.
A monitoring plan will be developed to observe any possible movement.
Ade is to clarify what loads he designed wall for, including active soil pressure.
E. Address 60 degree angle crack below PB3, not at reentrant corner
It will be reviewed in field.
Asked for Ade s explanation of the cause of this crack while on-site.
F Provide calculations to justify
As a part of the field review will also review construction practices and
sequences. A review of the calculations will be done and references given to this
review
It was noted that sheet pile removal could be a factor
Item 3
A. Address cause of vertical cracks in P134
This was addressed in Ade s September, 2 report. No cause identified.
During site visit asked that Ade address the possibility that beam may not be post
tensioned equally due to friction losses and whether this could cause the cracking.
Based on fact that Ade said that post tensioning design was performed by others (I
believe the company that did the post tensioning) the calculations for this post
tensioning design shall be provided. This shall include documentation showing that
the design was reviewed and approved by Ade prior to the post tensioning work. The
calculations shall show that the walls were including in the analysis since Ade says
that the walls are part of the integral system of the post tensioning. The calculations
Ou l ne to 10-09-08 Delamination _J%4eetmg.doc 2 of 7
should also address the 45 degree wall intersecting the east wall near PB3 showing
that it was included in the post tension design since it was a change to the project.
B. Variables addressed needs to determine whether the structure is sound.
Consider installing strain gauges prior to loading PT Deck.
It was my understanding that strain gauges were to be added prior to loading the
deck.
C Provide calculations to show cause of crack.
Temperature reinforcing to be viewed for adequacy and references provided to the
calculations Also see comments of item A above
Item 4
A. Cause of cracking does not appear to be complete.
Ade maintains that due to isolated delamination condition, Shear-fraction is not a
problem.
B. Cause does not account for all the variables.
Delamination probably caused by more than one issue,possibly including minor
shear friction effects (shear fraction does occur when there is an interface between
concrete poured at two separate times)
C. Cause related to the project issues.
D Cause related to post tensioning.
Item 5
A. Structural engineer has no reservations for placing the topping slab and
pavers
Ade recommends loading structure. Final approval to proceed, with loading the
deck structure, will be considered after a report addressing these issues is submitted
and accepted Repair procedure to address delamination repair will be submitted
prior to making repairs.
Outline to 10-09-08 El"eiamination Meeting.doc 3 of 7
It shall be made clear that calculations will be required to justify the proposed
repair The analysis shall show that the repair will resist any tension loads on the
inside face where the spalling occurred for the life of the structure, including any
affects of long term creep,post tensioning reforces, or loading from seismic events.
First Paragraph after Item 5
Previous discussion covered the following items.
The discussion ended at this point as all discussion in the above touched on each of the
remaining issues. Some short discussion shall briefly included to tie all these remaining
items to those discussed above
A. Engineer has not completely addressed items above.
B. Therefore recommended that remaining dead loads not be imposed until
items addressed.
C. Reinforcing and post tensioning minimize and/or eliminate cracking in
concrete.
Second Paragraph after Item 5
A. Engineer may not have accounted for or considered several design issues.
B. Excessive cracking and spalling due may be partially due difference in
rigidly (assume rigidity) along east wall line.
C. Fact post tension forces are being transferred into wall.
Outli ;c to 10-09 Cg Delamination Meet,n, doc 4 of 7
D At PB3 -45 degree wall adds stiffness and likely wasn't considered in design.
E. Post tensioning forces are being transferred into wall and not staying in
beam and slab (assumed).
F Likely putting torsion effects on the wall on the non braced side.
G. Torsion makes sense,based on the spalling pattern and cracks in the wall
under the beam.
H. Spalling decreases moving north, probably due to more flexible structure
towards the open end.
Third Paragraph after Item 5
A. Appears shear friction may not have been addressed in design per ACI 318,
possible cause for spalling/delamination.
B. Reinforcing extending through the wall and into beam would exaggerate this
effect.
C. ACI attachments discusses shear friction and design,joints may carry
significant tension due to restrained shrinkage or thermal shortening
Outline to 10-09-08 DelL�rn -iation Meeting.doc 5 of 7
D Therefore wall restrained by 45 degree wall, post tensioning is causing
similar effect and creating significant tension at joint, thus spalling.
E. Concern that repair will not address this issue, before or after loading,
tension will remain at joint due to tensioning forces.
F Spalling will continue unless this issue is addressed.
G Future spalling would create additional issues, concrete pull out rather than
break at joint, between the grout and concrete.
Last Paragraph
A. Engineer shall consider general comments noted above in response.
B. Include calculations for shear-friction forces.
C. Calculations shall justify grout repair is adequate without reinforcing, to
address the shear-friction forces.
Outline to in 09 08 Delamination Meeting dog 6 of 7
Where do we go from here?
• Final report
• A draft copy will be provided to Exeltech for review and final
report will be provided to Nathan West, COPA Building Official,
with a copy to Exeltech.
• Acceptance of report
• Nathan West, COPA Building Official, will issue a notice to
proceed with loading the deck structure (placement of the concrete
topping) This notice shall include the requirement of design
acceptance of the final repair procedure to address delamination.
Outline to 10-09-08 Deiami Lat on Meet.ti- doc 7 of 7
F
P-"7M-0
Commercial&Residential Building Concrete Excavation
a Utilities Custom Homes Sand=&Gravel
r
October T6, 2008
Jim Lierly
City of Port Angeles
t
Department of Community-Development,
321:Ea"st'Fifth Street
Port Angeles, WA,98362
RE Gateway West.Parking Garage Letter; dated,October 2,,2008
Dear Jim.
We are inxeceiptrof.your.letter dated October.2,_2008 First, I would•like to stress,that all`
official correspondence regarding the-,Gateway'Project need's to come through-the main
office, not handed.to,"someone ui the,feld. There is noway we can be,assured that the
document will be=directed,to the appropriate person,when received in this manner
Secondly; I have enclosed a letter from Poggameym Which we feel addresses the'
questions asked. I,:Would also like.to add.that in,the future, your P.E.,.can refer to the,
book-of-calculatioris and°,plans that were provided at the Gime we submitted for the permit.
If you have further questions]can be reached at(360) 683-5447, ext..5225, during
normal business hours.
Smcerely;a
9
ennifer How 11
nmo Construction, Inc.
Project Administrator
970 Carlsborg Road Sequin,WA 98382 (360),683'-5447' • Fax (360)..683-6475
Cont.Lit.#PRIMOC113307'
A
Primo Construction, Inc. Letter Of
970 Carlsborg Road
Sequim,WA 98382-8391 Transmittal
Phone- (360)683-5447
Fax:(360)683-6475 j
i
Date: 10/16/2008
TO- City of Port Angeles Project# 702203
321 East Fifth Street ATTN Jim Lierly
Port Angeles, WA 98362 RE. Gateway
We are sending you the following: gAttached 0 Under Separate Cover
The following items. ❑ Shop drawings ❑ Prints ❑ Plans
❑ Requisitions ❑Change Orders ❑Samples
Copies Date No. Description
1 10/16/2008 1 Gateway Letter w/Poggemeyer Letter
These are transmitted as indicated below•
9"For your use ❑ Approval as noted ❑ For Approval ❑As requested
❑Approved for Construction ❑ For review and comment ❑ Returned for corrections
❑ For payment ❑ Return ❑ Corrected Prints ❑ For bids due
Remarks.
Received By- Date•
Signed.
Title:
Copy to
❑ Recipient's Copy
❑ Sign&Return
0 File Copy
i
I
CONSTRUCTION, INC
Commercial&Residential Building Concrete Excavation
Utilities Custom Homes Sand&Gravel
i
October 16,2008
Jim Lierly
City of Port Angeles
Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
RE. Gateway West Parking Garage Letter,dated October 2,2008
Dear Jim.
We are in receipt of your letter dated October 2,2008. First,I would like to stress that all
official correspondence regarding the Gateway Project needs to come through the main
office,not handed to someone in the field. There is noway we can be assured that the
document will be directed to the appropriate person when received in this manner
Secondly,I have enclosed a letter from Poggameyer,which we feel addresses the
questions asked. I would also like to add that in the future,your P.E..can refer to the
book of calculations and plans that were provided at the time we submitted for the permit.
If you have further questions,I can be reached at(360)683-5447, ext..5228,during
normal business hours.
Sincerely,
Je=fer How 11o Construction,Inc.
Project Administrator
970 Carlsborg Road Sequim,WA 98382 (36o) 683-5447 • Fax (360) 683-6475
Cont.Lic.#PRIMOCIi33P7
SEF ? 4 2e
PocGEMEvE '0-18
DESIGN GROUP
September 22,2008
Mr James Bartee
Owner
Primo Construction,Inc.
970 Carisborg Road
Sequim,WA 98382
Dear Mr Bartee:
I
RE: Port Angeles International Gateway
West Parking Garage
Port Angeles,WA
In regards to the concrete cracking,the following commentary is presented:
1. Wali crack repairs can be implemented any time after 90 days of pouring,as about 2/3rds of the
total shrinkage has already occurred.It is not necessary to wait two years,as was recommended
In our site visit report of July 30,2008.It is now understood that waiting two years may not be a
viable option in terms of completing the project.Furthermore,the amount and degree of
cracking from the 90 day period to the two year period is likely not to be significant.
2. The epoxy injection method is appropriate for wall repairs.
3. The cracks at the elevated deck can be repaired with a crack healer/penetrating sealer A
�. product such as Sikadur 55 SLV is appropriate for this application.According to the manufacturer,
j it"penetrates/seals surface of slabs from water absorption,chloride-ion intrusion,and chemical
attack."it also"structurally improves the concrete surface"
I
4. The Sikadur product will require pre-treatment under the cracks,so the product does not leak
out.Use a product below the cracks such as Sikagard 670W(acrylic base)or Sikatop 144(cement
base).These product have been recommended by the manufacture to work with the surface
sealer
5. The deck sealer may be used locally or over the entire surface of the deck.It is recommended
that a trial crack be address initially to assess installation techniques and measure performance.
6. As always,apply the products in strict accordance with the manufacturers recommendations.
i
I
ai
512 8th Mr6-t South,Suft 2021 KkkWW,WeaNnpkon 98M31 P 425.827.69951 www.pogp=r," .a=
Y
r
POGGEMEYER
DESIGN GROUP
Port Angeles International Gateway
West Parking Garage
September 23,2008
Page 2
Should you have any additional questions or comments, please feel free to contact
US.
Regards,
i
Robert Bourdages,P.E.
Principal
Poggemeyer Design Group, Inc.
BO
URO
a �N
1 z
10 A
�T'SbN .
I
�^,yal0
vz��r� '� � � ,�-•gip _ f'��
• A draft copy will be provided to Exeltech for review and final
report will be provided to Nathan West, COPA Building Official,
with a copy to Exeltech.
• Acceptance of report
• Nathan West; COPA Building Official, will issue a notice to
proceed with loading the deck structure (placement of the concrete
topping) This notice shall include the requirement of design
acceptance of the final repair procedure to address delamination.
t y�
Outline to 10-09-08 delamination meeting.doc 7 of 7
#(1.0/9/2008) James Lierly .Zenovic 10-08-08 doe • 4 _..............._.Page 1
�.r
I
Zenovic& Associates,Incorporated Letter October 8,2008 j
Items to Address:
A. Address adequate reinforcing to handle reduction in bearing from spallmg.
B Account for buck out at stressing end.
yet—`✓
C. Calculations and sketch to show combination of buck out and spallmg don of
compromise beam bearing.
D Clarify the ultim to dead load factory of safety requirement. }o v Z
Item 2 y �'► ,
A. Regarding cracking address reentr t congers considered in design. v
�1�
Was re iiforcing added at reentrant corners to reduce crac nig.
LV
C Address horizonta cracking,notjust at corners.
I QW�
G g ev"S�rJE�.• C��a`SOKA
f�
S D Does proper vedical reinforcing eliminate horizontal crac
tT� Yid E. Address 60 de ee angle crack belowPB3 not at reentrant corner
F Provide calculations to justify Q�
Iten 3 v 1
Address cause of vertical cracks in PB3. ✓�i d�-�'�s 1�L A-t'?
ariables addressed needs to determine whether the structure is sound.
0 l
ADC Dov
Y ,�- C rovide calculations to show cause of crack. A--YLx
r
/� C AkC
Ite 44--.1
A. Cause of cracking does not appear to be complete
a
FftF.
B Cause does not account for all the variables. ltd
C. Cause related to the project issues. MAW
D Cause related to post tensioning.
"I v Item 5
A. Structural engineer has no reservations for placing the topping slab and pavers.
Zenovic 10-08-08 doc 1 of 3
(10/9/2008) James Lierly Zenovic 10-08-08 doc _.-. _.... ...... ._.w,,.._ . _..... Page 2
� r
OL
�
First Paragraph after Item 5 C,V
A. Engineer has not completely addressed items above.
B Therefore recommended that remaining dead loads not be imposed until items
addressed.
C Reinforcing and post tensioning minimize and/or eliminate cracking in concrete.
Second Paragraph after Item 5
A. Engineer may not have accounted for or considered several design issues.
B Excessive cracking and spalhng due may be partially due difference in rigidly
(assume rigidity) along east wall line.
I
C Fact post tension forces are being transferred into wall.
D At PB3 45 degree wall adds stiffness and likely wasn't considered in design.
E. Post tensioning forces are being transferred into wall and not staying in beam and
slab (assumed).
F Likely putting torsion effects on the wall on the non braced side.
G Torsion makes sense,based on the spallmg pattern and cracks in the wall under
the beam.
H. Spalling decreases moving north,probably due to more flexible structure towards
the open end.
Third Paragraph after Item 5
A. Appears shear friction may not have been addressed in design per ACI 318
possible cause for spallmg/delamination.
B Reinforcing extending through the wall and into beam would exaggerate this
effect.
C ACI attachments discusses shear friction and design,joints may carry significant
tension due to restrained shrinkage or thermal shortening.
D Therefore wall restrained by 45 degree wall,post tensioning is causing similar
effect and creating significant tension at point,thus spalling.
E. Concern that repair will not address this issue,before or after loading, tension will
remain at point due to tensioning forces.
Zenovic 10-08-08 doc 2 of 3
i
i
_....__. ......_ __...._...__..... ......_ 8-08 doc Page 3
(10/9t'2008)James Lierly...Zenovic..��.;�. .._._....._............__.__..... ........_........_.._........... ..... .. .. . ... .... . _....... ......_._......_.._.._ . _...._.. .. .....................__ ....r..�,
i
F Spallmg will continue unless this issue is addressed.
G Future spalling would create additional issues, concrete pull out rather than break
at joint,between the grout and concrete.
Last Paragraph.
A. Engineer shall consider general comments noted above in response.
B Include calculations for shear friction forces.
C Calculations shall justify grout repair is adequate without reinforcing,to address
the shear friction forces
I
Zenovic 10-08-08 doc 3 of 3
i
Zenovic & Associates, Incorporated Letter October 8, 2008
Items to Address.
ItenQ
A. Address adequate reinforcing to handle reduction in bearing from spallmg.
B Account for buck out at stressing end.
C Calculations and sketch to show combination of buck out and spalling do not
compromise beam bearing.
D Clanfy th ultimate dead load Vory safety requirement,
$,. Tf
0�4
VLO
L�
1 Z
Item 2
A. Regarding cracking address reentrant corners considered in design.
C
B Was reinforcing added at reentrant corners to reduce cracking.
C Address horizontal cracking, not dust at corners.
1�F C rojoh� �V
D Does proper vertical reinforcing eliminate horizontal cracks.
Outline of Zenovic letter 10-08-08_2 doc 1 of 5
1
E. Address 60 degree angle crack below PB3, not at reentrant corner
;4L i-� �d It,— A-
F Provide calculations to justify
Item 3
A. Address cause of vertical cracks in PB3
c�-� �U� k rv�z
B Variables addressed needs to determine whether the structure is sound.
IA� 6-,.,
C Provide calculations to show cause of crack.
Item 4
A. Cause of cracking does not appear to be complete.
B Cause does not account for all the variables.
OIL-
C Cause related to the project issues.
D Cause related to post tensioning. A
pv kA o-u a, -1 ��w, �� 11 ,,- �- ,
4i6 �4 kA-V) m- /-")-�, �-T�, �,
Outline of Zenovic letter 10-08-08_2.doc 2 of 5
\ �'���
Item 5
A. Structural engineer has no reservations for placing the topping slab and pavers.
First Paragraph after Item 5
A. Engineer has not completely addressed items above.
B Therefore recommended that remaining dead loads not be imposed until items
addressed.
C Reinforcing and post tensioning minimize and/or eliminate cracking in concrete.
Second Paragraph after Item 5
A. Engineer may not have accounted for or considered several design issues.
B Excessive cracking and spalhng due may be partially due difference in rigidly
(assume rigidity) along east wall line.
C Fact post tension forces are being transferred into wall.
D At PB3 - 45 degree wall adds stiffness and likely wasn't considered in design.
Outline of Zenovic letter 10-08-082 doc 3 of 5
E Post tensioning forces are being transferred into wall and not staying in beam and
slab (assumed)
F Likely putting torsion effects on the wall on the non braced side.
G Torsion makes sense, based on the spalling pattern and cracks in the wall under
the beam.
H. Spallmg decreases moving north, probably due to more flexible structure towards
the open end.
Third Paragraph after Item 5
A. Appears shear friction may not have been addressed in design per ACI 318,
possible cause for spalling/delamination.
B Reinforcing extending through the wall and into beam would exaggerate this
effect.
C ACI attachments discusses shear friction and design,points may carry significant
tension due to restrained shrinkage or thermal shortening.
D Therefore wall restrained by 45 degree wall,post tensioning is causing similar
effect and creating significant tension at joint, thus spalling.
Outline of Zenovic letter 10-08-08_2 doc 4 of 5
E. Concern that repair will not address this issue, before or after loading, tension will
remain at joint due to tensioning forces.
F Spallmg will continue unless this issue is addressed.
G Future spalling would create additional issues, concrete pull out rather than break
at joint,between the grout and concrete
Last Paragraph
A. Engineer shall consider general comments noted above in response.
B Include calculations for shear-friction forces.
C Calculations shall justify grout repair is adequate without reinforcing, to address
the shear-fraction forces.
Where do we go from here?
• Final report
• Acceptance of report
r
Outline of Zenovic letter 10-08-08_2.doc 5 of 5
(10fe�%�008)NJim,MahlumTomorrow's.Meeting Regarding Plaza Loading m �m Pagel
r.
From Stan Cruse <SCruse@parametrix.com>
To Jim Mahlum [Jmahlum@cityofpa.us]' <Jmahlum@cityofpa.us> 'Ingo <igoll
Date 10/8/2008 3 31 PM
Subject: Tomorrow's Meeting Regarding Plaza Loading
Attachments. Zenovic 10-08-08 doc
CC James Dugan <JDugan@parametrix.com> James Lierly' <Jlierly@cityofpa.us
Jim and Ingo
Attached is a breakdown of the Zenovic&Associates letter in order to facilitate the meeting by addressing
all the issues item by item
Parametrix
inspired people inspired solutions making a difference
Stanley C Cruse,AIA, LEED v.2 AP
Project Manager
phone 253 752 9862
fax: 253 752.9865
cell 360 710 6425
scruse@parametrix.com
Zenovic & Associates, Incorporated Letter October 8, 2008
Items to Address.
Item 1
A. Address adequate reinforcing to handle reduction in bearing from spalling.
B Account for buck out at stressing end.
C Calculations and sketch to show combination of buck out and spallmg do not
compromise beam bearing.
D Clarify the ultimate dead load)factory of safety requirement.
Item 2
A. Regarding cracking address reentrant corners considered in design.
B Was reinforcing added at reentrant corners to reduce cracking.
C Address horizontal cracking,not dust at corners.
D Does proper vertical reinforcing eliminate horizontal cracks.
E Address 60 degree angle crack below PB3, not at reentrant corner
F Provide calculations to justify
Item 3
A. Address cause of vertical cracks in PB3
B Variables addressed needs to determine whether the structure is sound.
C Provide calculations to show cause of crack.
Item 4
A. Cause of cracking does not appear to be complete.
B Cause does not account for all the variables.
C Cause related to the project issues.
D Cause related to post tensioning.
Item 5
A. Structural engineer has no reservations for placing the topping slab and pavers.
Zenovic 10-08-08 doc 1 of 3
First Paragraph after Item 5
A. Engineer has not completely addressed items above
B Therefore recommended that remaining dead loads not be imposed until items
addressed.
C Reinforcing and post tensioning minimize and/or eliminate cracking in concrete.
Second Paragraph after Item 5
A. Engineer may not have accounted for or considered several design issues.
B Excessive cracking and spalling due may be partially due difference in rigidly
(assume rigidity) along east wall line.
C Fact post tension forces are being transferred into wall.
D At P133 - 45 degree wall adds stiffness and likely wasn't considered in design.
E. Post tensioning forces are being transferred into wall and not staying in beam and
slab (assumed)
F Likely:puttmg torsion effects on the wall on the non braced side
G Torsion:makes sense, based on the spalling pattern and cracks in the wall under
the beam.
H. Spalling decreases moving north,probably due to more flexible structure towards
the open end.
Third Paragraph after Item 5
A. Appears shear fraction may not have been addressed in design per ACI 318,
possible cause for spalling/delamination.
B Reinforcing extending through the wall and into beam would exaggerate this
effect.
C ACI attachments discusses shear fraction and design,points may carry significant
tension due to restrained shrinkage or thermal shortening.
D Therefore wall restrained by 45 degree wall, post tensioning is causing similar
effect and creating significant tension at joint, thus spalling.
E. Concern that repair will not address this issue, before or after loading, tension will
remain at joint due to tensioning forces.
F Spallmg will continue unless this issue is addressed.
Zenovic 10-08-08 doc 2 of 3
G Future spallmg would create additional issues, concrete pull out rather than break
at joint, between the grout and concrete
Last Paragraph.
A. Engineer shall consider general comments noted above in response.
B Include calculations for shear-faction forces.
C Calculations shall justify grout repair is adequate without reinforcing, to address
the shear-fraction forces.
Zenovic 1,0-08-08 doc 3 of 3
CWIL.ENGMRING
LANU:SURVEVING_
& ASSOCIATES Ms
p301 East 6th Street,Suite 1
Port Angeles,Washmgton 98362
INCORPORATE D (360)417-0501
' S0 Pm Fax(360)417-0514
October 6, 2008 ES E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles,WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
I have reviewed the response letter from Ade Bright dated September 30 2008 to my letter dated
September 29, 2008 His letter does not completely address the issues noted in my letter and I
am requesting the following additional information:
1) The calculations in his letter appear to show that the remaining bearing area
of the wall is adequate to support the proposed ultimate dead loads, however
it does not address the beam itself The engineer shall also address the
issue of whether the beam is adequately reinforced to handle this reduction in
bearing from the spalling in the wall since the inside face of the bearing is
now in a different location. The engineer shall account for the buck out at the
stressing end of the beam that is shown in the pictures provided to this office
in previous documents and a generic detail on Sheet S3 02. Please provide
calculations and sketches to show that the combination of the buck out and
spalling do not compromise the bearing of the beam Also, Please clarify
whether the ultimate dead load shown in the calculations includes the
required factor of safety of 1.2.
2) The explanation of the horizontal cracking in the wall and the 45 degree
cracking at the reentrant corners is plausible due to their locations. Please
address whether the reentrant corner was considered in the design and
whether additional reinforcing was added at the reentrant corners to reduce
this possibility Also please address the horizontal cracking and the fact that
this cracking is not just occurring near the reentrant corners. Shouldn't
proper vertical reinforcing in the walls eliminate the horizontal cracks? Also
please address the approximately 60 degree angle crack which has occurred
below beam PB3 but not at the reentrant corner Please provide calculations
to justify
3) The cause of the vertical cracks in beam PB3 shall be addressed by the
engineer The number of variables noted in the response letter is the specific
reason that the cause of the cracks needs to be determined to show that the
structure is structurally sound Provide calculations to show the cause of the
crack.
4) The cause of the cracking and spalling/delamination noted above does not
appear complete and does not account for all the variables and issues related
to the project and the post tensioning. Please see my comments below
related to the design
Page 2
October 6, 2008
Port Angeles International Gateway
5) It is noted that the structural engineer states that they have no reservations
for placing the topping slab and pavers.
In general the engineer has not completely addressed the items noted above and recommend
that the remaining dead loads not be imposed until the items have been addressed It is known
that cracks are inherent in any concrete structure but that reinforcing and especially post
tensioning is used to minimize and/or eliminate cracking in the concrete
It appears to this office that the engineer may not have accounted for or considered several
issues in the design It appears that the excessive cracking and spalling may be partially due to
the difference in rigidly along the east wall line and the fact that post tension forces are being
transferred into the wall. At the south edge of PB3, the concrete wall makes a 45 degree angle
and extends towards the southwest. This 45 degree wall adds stiffness to the wall that likely
wasn't considered in the design. Since the wall reinforcing extends up through the beam it is
likely that a portion of the post tension forces are being transferred into the wall rather than
staying in the beams and slab as assumed in the design This is likely putting some torsion
effects on the wall on the non braced side which appears to make sense based on the spalling
pattern and the cracks in the wall under the beam As you move to the north the spalling under
the beams decreases until there is none and is probably partially due to the fact that the structure
gets more flexible towards the open end
It also appears that shear-friction may not have been addressed in the design as is required per
ACI 318 and should be considered as a possible cause for the spalling/delamination. The
reinforcing extending through the wall and into the beam would exaggerate this effect. Attached
are four pages from a commentary book produced by the Portland Cement association for the
ACI318 Code which discusses shear friction and design Page 14-5 of the attached documents,
second paragraph of Section 11 7 7 notes that joints may carry a significant amount of tension
due to restrained shrinkage or thermal shortening. It is logical to assume that since the east wall
is restrained due to the 45 degree wall that the post tensioning is causing a similar affect and
creating significant tension at the joint and thus the spalling. It is of concern that the proposed
repair will not address this issue, whether it is done before or after loading, since the tension at
the joint will remain due to the post tensioning forces It is opinion of this office that spalling may
continue to occur over the life of the structure unless this issue is addressed. Future spalling of
the wall would create additional issues since it would likely pull out portions of the concrete rather
than break at the joist between the grout and concrete
The engineer shall consider the general comments noted above in their response and shall
include calculations for the shear-friction forces. The calculations shall justify that the grout repair
is adequate without reinforcing to address the shear-friction forces.
Please call me if you have any questions on this matter ((6(L�_b
Sincerely
Tracy udgel P E.
�r
Fc: JN 08091 .9p kEci;11 '
�SSIOIsa'
-rh;x Wov ),=-9A
1171 Applications
4
f Shear-friction design is to be used where direct shear is being transferred across a given plane. Situations where
shear-friction design is appropriate include the interface between concretes cast at different times, an interface
between concrete and steel, and connections of precast constructions, etc. Example locations of direct shear
transfer and potential cracks for application of the shear-friction concept are shown in Fig. 14-2 for several types
} of members. Successful application of the concept depends on proper selection of location of the assumed slip
t or crack. In typical end or edge bearing applications,the-crack,tends to occur at an angle-of-about-WdegwesYto
the vertical(see Example 14:2).
Bearing
Deck stab
Splice DaDDed end
Corbel Connection
Cast in place addition
Bearing
Potential cracks-t"
Column base
=i.
Figure 14-2 Applications of the Shear-Friction Concept and Potential Crack Locations
117.3 Shear-Transfer Design Methods
The shear-fnction design method presented ,n 117 4 is based on the simplest model of shear-transfer behavior,
£; resulting in a conservative prediction of shear-transfer strength. Other more comprehensive shear-transfer relation-
ships provide closer predictions of shear-transfer strength. The performance statement of 117.3 any other
shear-transfer design methods. -WzhWes the-other.methods-within_xhe_scnn�d intent.of 117 -However, it
shcju b"ated H 7.5-threugh4L7:-10 apply to-whatever shear-transfer method is used: One
. of the,morecompreherisiverethods-is-outlined-in-RII-91—Applicatiarrafdie"Modified Shear=Fri-ctiun Method'
is illustrated in Part 15 Example 15.2. The 1992 edition of the code introduced in 17.5.2:3 a modified shear-
` fcetion-.equation. Xagplies.to t#e4ntedac.e.shear-bg�precastr-ete-and-cast an-place concrete.
Els with the other-shear design-applications,—the—cod— visions for shear-friction are presented in terms of
,shear:transfer strength Vn for direct appliq, tion in the basic shear strength relation.
' Required shear-transfer strenph < Design shear-transfer strength
Vu < l$`Vn Eq. (11-1)
142
_
n
{° Note that 0 is 0 75 for shear and torsion(9.3.2.3). Furthermore,it is recommended that =0.75 be used for all
s design calculations involving shear-friction, where shear effects predominate. For example, 11.9.3 1 specifies
the use o 0, =-0-35 for all design calculations in accordance with 11.9(brackets and corbels). The nominal shear
strength Vn is computed as.
Yom" Y41 - --E-q. (14-25)
Cambining£gs:z�1-1-+)- (-1 25),thelequire&shear-trmsfer-s - ent perpen-
dicular to the shear plane is:
y. Vu < $Avffy W--
The required area of shear-friction reinforcement,Avf can be computed directly from.
a Avf = Vu
Of yµ
The condition where shear-friction reinforcement crosses the shear-plane at an angle of other than 90 degrees is
illustrated in Fig. 14-3 The tensile force Avffy is inclined to the crack and must be resolved into two compo-
nents. (1)a clamping component Avffy sin a f with an associated frictional force Avffy sin a fµ,and(2)a com-
ponent parallel to the crack that directly resists slip equal to Avffy cos of Adding the two components resisting
slip, the nominal shear-transfer strength becomes:
Vn = Avffy sin ofµ +Avffy cos a f
= Avffy(µSin of +cos af)
Substituting this into Eq. (11-1)
Vu <_ [Avffy sin a fµ +Avffy cos of] Eq. (11-26)
VU
of
�- r— -- —AVffy sin ofµ
at
AvffY
Avffy sin of
' Avffy cos of
Vn=Avffy sin ofµ+Avffy cos of
Figure 14-3 Idealization of Inclined Shear-Friction Reinforcement
For shear reinforcement inclined to the crack, the required area of shear-friction reinforcement, A„f, can be
computed directly from.
A
v f = Vu
Of y (µsina f + cosaf)
r,
14-3
Note that Eq (11-26)applies only when the shear force V„produces tension in the shear-friction reinforcement.
The shear-friction method assumes that all shear resistance is provided by friction between crack faces. The actual
mechanics of resistance to direct shear are more complex,since dowel action and the apparent cohesive strength of
the concrete both contribute to direct shear strength. It is,therefore,necessary to use artificially high values of the
coefficient of friction g in the direct shear-friction equations so that the calculated shear strength will be in reason-
able agreement with test results. Use of these high coefficients gives predicted strengths that are a conservative
lower bound to test data,as shown in Fig. 14-4 The modified shear-friction design method given to R11 7.3 is one
of several more comprehensive methods which provide closer estimates of the shear-transfer strength.
1600
•Test Results
1400 ,
1200 ;
1000 Modified
Shear-Friction
Method . . .
ML Boo ——r ——. V„/Ac Limit
C ass
> 600 —— .— 0.2 x 3000 psi
� r ,
400 , 1 Shear-Friction
Design Method
200 06 M
'Pfy>200psi
0
200 400 600 800 1000 1200
,f
P� psi Y _,
Figure 14-4 Effect of Shear-Friction Reinforcement on Shear Transfer Strength
11 7.4.3 Coefficient of Friction—The effective coefficients of friction, g for the various interface con-
ditions include a parameter X which accounts for the somewhat lower shear strength of all-lightweight and
sand-lightweight concretes_ For example, the g value for all lightweight concrete (X = 0 75) placed against
hardened concrete not intentionally roughened is 0 6 (0 75) = 0 45 The coefficient of friction for different
interface conditions is as follows. uw
Concrete placed monolithically 1 4X
Concrete placed against hardened concrete with
surface intentionally roughened as specified in 117.9 1 QX
pal,
Concrete placed a�nst hardened concrete Y?7
not intentionally roughened 0 6X
Conprete anchored to as-rolled structural steel by
beaded studs-or-by-reinforcing bars(see 117 10) 0 7X
yam.
where X= 1.0 for normal weight concrete, 0.85 for sand-lightweight concrete,and 0 75 for"all light
weight' concrete.
14-4 �
11 7.6 Maximum Shear-Transfer Strength
The shear-transfer strength Vn cannot betaken greater than 0.2 f' nor 800 psi times the area of concrete section
resisting shear transfer. This upper limit on Vn effectively limits the maximum reinforcement, as shown in
Fig. 14-4 Also,for lightweight concretes, 11.9.3.2.2 limits the shear-transfer strength Vn along the shear plane
for design applications with low shear span-to-depth ratios a/d, such as brackets and corbels. This further
restriction on lightweight concrete is illustrated in Example 14 1
1177 Normal Forces
Equations (11-25) and (11-26) assume that there are no forces other than shear acting on the shear plane. A
certain amount of moment is almost always present in brackets,corbels,and other connections due to eccentric-
ity of loads or applied moments at connections. In case of moments acting on a shear plane,the flexural tension
stresses and flexural compression stresses are in equilibrium. There is no change in the resultant compression
Avffy acting across the shear plane and the shear-transfer strength is not changed. It is therefore not necessary to
provide additional reinforcement to resist the flexural tension stresses,unless the required flexural tension rein-
forcement exceeds the amount of shear-transfer reinforcement provided in the flexural tension zone.
Joints may also carry a significant amount of tension due to restrained shrinkage or thermal shortening of the
connected members. Friction of bearing pads, for example, can cause appreciable tensile forces on a corbel
supporting a member subject to shortening. Therefore,it is recommended,although not generally required,that
the member be designed for a minimum direct tensile force of at least 0.2V„ in addition to the shear. This
minimum force is required for design of connections such as brackets or corbels(see 11.9.3 4),unless the actual
force is accurately known. Reinforcement must be provided for direct tension according to 117 7 using AS=
Nuc/0fy,where Nuc is the factored tensile force. MOP& .:AQ A.-. y,e.,V�,Aq.i npCJ p ?L t
J��, D �'loN r n,p
Since direct tension perpendicular to the assumed crack(sheen plane)detracts from the shear-transfer strength,it (y
follows that compression will add to the strength. Section 117 7 acknowledges this condition by allowing a
permanent net compression to be added to the shear-fraction clamping force, Avffy It is recommended, al-
though not required, to use a reduction factor of 0.9 for strength contribution from such compressive loads.
11 7.8— 11 710 Additional Requirements
Section 117.8 requires that the shear-friction reinforcement be `appropriately placed' along the shear plane.
Where no moment acts on the shear plane,uniform distribution of the bars is proper. Where a moment exists,the
cemfoccement shooldbe d%v&1bu<ed�n the flexocal tension zone.
Reinforcement should be adequately embedded on both sides of the shear plane to develop the full yield strength
of the bars. Since space is limited in thin walls, corbels, and brackets, it is often necessary to use special
anchorage details such as welded plates, angles, or cross bars. Reinforcement should be anchored in confined
concrete. Confinement may be provided by beam or column ties, `external' concrete, or special added rein-
forcement.
In 117.9 if coefficient of friction µ is taken equal to 10%,concrete at the interface must be roughened to a full
amplitude of approximately 1/4 in. This can be accomplished by raking the plastic concrete or by bushhammenng
or chiseling hardened concrete surfaces.
A final requirement of 117 10, often overlooked, is that structural steel interfaces must be clean and free of
paint. This requirement is based on tests to evaluate the friction coefficient for concrete anchored to unpainted
structural steel by studs or reinforcing steel(g =0 7). Data are not available for painted surfaces. If painted
surfaces are to be used, a lower value of g would be appropriate.
14-5
J
October 3, 2008
Adyfe Bright
Re Port Anizeles International GatewU
Dear Mr Bright
I am the Building Official for the City of Port Angeles In that role I owe a duty to the citizens,
to the contractor, and to the City to assure that construction on the Gateway Project is
proceeding safely and in accordance with the contract plans and specifications. I recently
became aware of the cracking and spallmg in concrete work on the Gateway project. These mem
t4&4aaw issues that have been addressecl most recently in a letter dated September 22 from
Tracy Grudgel and in a letter written by you dated September 30 I have
reviewed those letters and the prior letters referenced in them. LROW411a4lin your last letter you
did not answer, completely and fully, every point raised in Mr Grudel s letter Nevertheless,
it is not my intent to ask for further response to Mr Grudel s letter Instead, in my role as
building official, I want to satisfy my duty as the City Building Official and try to keep the
project moving forward.
Tom, you can simplify the process and keep the project moving forward if you as the
structural engineer of recor for the GatewayProject ect will certify to mein writing the following•
Y� r
1 You have inspected the project and are familiar with the cracking and spallmg
��described in the prior letters.
2 You have all the information that you need to express an opinion on the subject
of the cracking and spallmg in the relationship to the safety and integrity of the
project.
3 It is safe to continue with the construction of the project.
4 The project when completed, including cracking and spallmg, will be safe for
occupancy and will be in conformance with the contract plans and specifications.
5 The project when completed will be safe for public occupancy
Please provide this certification to me in writing as soon as possible
Thank you,
Nathan West
(G\LEGAL\LETTERS\LETTERS.2008\Bright.GatewayProject.100308.wpd)
• ORTNGELES
It low
W A S H I N G T 0 N, U S A
DATE October 2, 2008
T O Primo Construction
FROM Jim Lierly; Building Inspector
Community& Economic Development Department
SUBJECT GATEWAY PARKING GARAGE (WEST)
The Department of Community& Economic Development has received the final report from
Zenovic &Associates Inc concerning structural issues with Gateway west parking garage (See
attached documents)
Secondarily, as we have previously discussed, the parking layout does not meet the requirements
of the City of Port Angeles I know you are working on a resolution, but, for the record, the
layout and striping must be corrected in order to issue final occupancy and final for the structure.
There may be additional corrections required as we work through routine final inspections. As
of this time, these are the issues o concern that I am aware of that need your immediate
attention. As always, all wor is subject to Deld approval.
Please eel free to contac me you ha any questions
Jim Lierly,
Building Inspector
417-4816 off. or 808-0534 cell
cc Nathan West
Sue Roberds
CML.ENGINEERING
9"&
LAND SURVEYING
N 0 V I�C - _. �_ASSOCIATES 301 East 6th Street,Suite 1
Port Angeles,Washington 98362
I N C O R P O R A T E D
(360)417-0501
September 29 2008 Fax(360)417-0514
E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway—West Parking Garage
Dear Mr Lierly
This is a follow up to the inspection I performed with you at Gateway West Parking Garage on
September 23, 2008 This inspection included several representatives from the City of Port
Angeles, a representative from Exeltech, and two representatives from Primo Construction. I
have also reviewed structural site visit reports#1 and#4 for the parking garage. Based on the
inspection and a review of the documentation noted above the following additional information is
requested from the engineer-
1 The engineer shall address the migration of the cracks in the deck slab from the time
of the July 30 2008 inspection (report#4)to present. Based on Exhibit A, provided
by Primo Construction, a number of the cracks have increased in length and
additional cracks have occurred Please address the recommendation in site visit
report#4 that no physical crack control measures be implemented for at least two
years Also provide proposed recommendations for repair of the cracks in the upper
deck slab
2. The engineer shall provide an analysis of the cracks occurring in the post-tensioned
(PT) beams at the inside face of the concrete shear walls in the east/west direction.
There are three semi-vertical cracks which have developed at each end of each PT
beam near the inside edge of the concrete shear walls. These can be seen on
pictures#1 #2, #3, and#4 Please address the fact that the stirrup spacing shown
on detail 8/S8 changes at this same location and the fact that the shear walls appear
to be providing vertical support of the PT beams
3 Please address the cracking in the west wall of the structure along Grid Line
0 1 Provide an explanation as to cause of cracks and proposed repair methods if
any These cracks occur at a number of locations and can be seen in pictures#8, 9
10 11 12, 13, 14 15 16, and 17
4 The engineer shall address the cracking issues noted in items 1 through 3 above
with any required fixes and shall provide a statement that the cracking noted above,
with any proposed fixes, does not compromise the structural integrity of the structure.
Please call me if y u have any further questions on this matter
Sincerely r
2QI�
Tracy Gudgel, P E.
Fc: JN 08091
i
r
09 / 23 / 2008
W
09 / 23 / 2008
�z
�i
09 / 23 / 2008
4
ch)
not
40
Cr
4
� Y
� t
' r
r
r. .
.! E
09 / 23 / 2008
09 / 23 / 2008
i
7
09 / 23 / 2008
BOOZ/ EZ/ 60
t
u =
1
09 / 23 / 2008
r or
9.
T �
bt
ar
-al
r �k o-a yr
OL �~
$p[ r� .
dFi
a
y
i
i
ti
Y
• � AY x�I� -q_
w -
s �
09 /23 /2008
k
- . 9
-
� _ < % , • \ , ` ,z�iw �2 ° -
`
{ \
@ � $ @ ■
�
09 / 23 / 2008
09 / 23 / 2008
L I
N
M
N
07
O
r � +
t �•
09 / 23 / 2008
r
09 / 23 / 2008
CITY ORT STELE
•► W A S H I N G T 0 N, U S A
/
DATE. October 1, 2008
T O Jim Mahlum, Engineer
FROM Jim Lierly, Building Inspector
Community&Economic Development Department
SUBJECT GATEWAY PARKING GARAGE (WEST)
The Department of Community& Economic Development has received the final report from
Zenovic & Associates Inc concerning structural issues with Gateway west parking garage (See
attached documents)
Secondarily, as we have previously discussed, the parking layout does not meet the requirements
of the City of Port Angeles I know you are working on a resolution, but, for the record, the
layout and striping must be corrected in order to issue final occupancy and final for the structure
There may be additional corrections required as we work through routine final inspections As
of this time, these are/ak
of conce that I am aware of that need your immediate
attention As alwayss subjec to field approval
Please feel free to coyou e any questions
Ji Lierly,
Building Inspector
417-4816 off or 808-0534 cell
cc Nathan West
Sue Roberds
r'.
n
,Z
Rrigkt E—ngineering Inc Consulting Structural and Civil Engineering
See tracked revision onpage 2
September 30,2008 BEI# 116.03R
Parametrix,Inc.
Attn:Stan Cruse,Project Manager
2102 N Pearl Street,Suite 301 0
Tacoma,WA 98406 Q
RE. PORT ANGELES INTERNATIONAL GATEWAY—Plaza Deck NOV 1210 D
Response to Mr Tracy Gudgel Comments p OF
C/T y
e'°t.ofco PORT
mm�n'tY D NGFC
Dear Stan. e�e/open
The following is our response to the information request by Mr.Tracy Gudgel in his letter to
Mr Jim Lierly dated September 22,2008.
Item 1
Delamination/Spall under PB3 at Grid 8/B has been monitored by the contractor and CM since it
was first observed.Our field reports from site visits have noted our observations,opinions,and
recommendations.
The following are beam Dead Load(DL)and Live Load(LL)reactions under beams supported
along Grid 8
Beams PB3 and PB5 at 8B and 8C,respectively Total DL=215k and LL=50k
Beams PB5A,PB7 and PB7 at 8D 8D3 and 8D6,respectively—Total DL—_87'and LL—_5 0 k
Total DL(Dead Load)are all permanent loads including pavers,topping and soil.Minimum width
of bearing required under total ultimate Dead Load is under 5' which is approximately 51/z that Mr.
Gudgel measured at the deepest location.
Item 2.
During the site visit of August 21 2008,we observed some horizontal and diagonal hairline cracks
on the wall emanating from the bottom corner of the framing beams along Grid 8.These cracks
coincide with the reentrant corner of the wall blockout for the PT beam as well as the location of
concrete anchors that supported the horizontal walers.The temporary walers were installed to
facilitate backfill behind the wall before the plaza deck was placed.These cracks are not of concern
since they may have developed even if the beams were not present because of the reentrant comer.
1809 ,A A, jvike On I '_ttla WA)8101 381 1 p{. 200.&25-;77 1 Fn nh.07 85I InFo 4��}ylnkany.om
a�
r-
1
' 6Mr Stan Cruse,AIA,LEEDv.2 AP
September 30,2008
Page 2 of 2
Item 3
Our site visit report dated September 2,2008,cited by Mr Gudgel,noted the observed cracks and +
crack pattern,and when they were first noticed by the field personnel.Again,it was reported that t
they were first observed during a period of elevated temperatures.The crack location and pattern
doeso[,fit flexural or shear cracks and we did not attempt to determine the cause simply because of iag"r.
the inordinate number of variables,including temperature.The slab is reinforced for temperature in
that direction.
Item 4
We have provided our best technical explanation in our letter dated September 19 2008.Please note
that beam PB5 on Grid 8C has the same magnitude of reaction as the beam in question,but higher
post-tensioning force;and that the vertical rebar in the wall extends through the construction joint
beam pocket into the beam.This restrains the beam from rotating freely as noted in our last letter
The presence of sand and silt was reported in our site visit report dated March 19 2008.The
infiltration of silt occurred before the waterstop was placed around the construction joint.
Item 5
We have observed the cracks and have recommended in our letter dated September 19 2008,that
the topping slab and pavers be placed on the deck,and have recommended repairs be made after
that.This repair could be made just like the others ahead of adding loads to the deck,but we think it
is prudent to impose all permanent loads before repair is made.
To conclude,cracks are inherent in any concrete structures,and as the Structural Engineer of
Record,we have no reservation for the placement of topping slab and pavers,and we welcome any
technical proof that states otherwise.
Please contact me if you have any questions.
Best regards,
Ade J Bright,PE,SE
erigkt -E-nginee-r+ng Inc Consulting Structural and Civil Engineering
v-,
September 30, 2008 BEI# 116 03R
�1����. Jed S
Parametnx' Inc. I
Attn. Stan Cruse,Protect Manager
2102 N Pearl Street, Suite 301 �Qv
Tacoma,WA 98406 FILE LS O
RE PORT ANGELES INTERNATIONAL GATEWAY—Plaza De f or �A, O?
Response to Mr Tracy Gudgel Comments
ypeNop�Fs
Dear Stan.
The following is our response to the information request by Mr Tracy Gudgel in his letter to
Mr Jim Lierly, dated September 22,2008
Item 1
Delamination/Spall under PB3 at Grid 8/B has been monitored by the contractor and CM since it
was first observed. Our field reports from site visits have noted our observations, opinions, and
recommendations.
The following are beam Dead Load (DL) and Live Load(LL) reactions under beams supported
along Grid 8
Beams PB3 and PB5 at 8B and 8C,respectively-Total DL=215k and LL=50 k
Beams PBSA, PB7, and PB7 at 8D, 8D3 and 8D6,respectively—Total DL=87 k and LL=50 k
Total DL(Dead Load) are all permanent loads including pavers, topping and soil. Minimum width
of bearing required under total ultimate Dead Load is under 5",which is approximately 5%2"that Mr
Gudgel measured at the deepest location.
Item 2
During the site visit of August 21,2008 we observed some horizontal and diagonal hairline cracks
on the wall emanating from the bottom comer of the framing beams along Grid 8 These cracks
coincide with the reentrant comer of the wall blockout for the PT beam as well as the location of
concrete anchors that supported the horizontal walers. The temporary walers were installed to
facilitate backfill behind the wall before the plaza deck was placed. These cracks are not of concern
since they may have developed even if the beams were not present because of the reentrant corner
� e
V 6 Mr Stan Cruse,AIA,LEEDv.2 AP
September 30,2008
Page 2 of 2
Item 3
Our site visit report dated September 2, 2008, cited by Mr Gudgel,noted the observed cracks and
crack pattern, and when they were first noticed by the field personnel. Again, it was reported that
they were first observed during a period of elevated temperatures. The crack location and pattern
does fit flexural or shear cracks and we did not attempt to determine the cause simply because of the
inordinate number of variables, including temperature. The slab is reinforced for temperature in that
direction.
Item 4
We have provided our best technical explanation in our letter dated September 19,2008 Please note
that beam PB5 on Grid 8C has the same magnitude of reaction as the beam in question,but higher
post-tensioning force; and that the vertical rebar in the wall extends through the construction point
beam pocket into the beam. This restrains the beam from rotating freely, as noted in our last letter
The presence of sand and silt was reported in our site visit report dated March 19, 2008 The
infiltration of silt occurred before the waterstop was placed around the construction joint.
Item 5
We have observed the cracks and have recommended in our letter,dated September 19, 2008,that
the topping slab and pavers be placed on the deck, and have recommended repairs be made after
that. This repair could be made just like the others ahead of adding loads to the deck,but we think it
is prudent to impose all permanent loads before repair is made.
To conclude, cracks are inherent in any concrete structures, and as the Structural Engineer of
Record, we have no reservation for the placement of topping slab and pavers, and we welcome any
technical proof that states otherwise.
Please contact me if you have any questions.
Best Te Yrds, 3 F 1 kz,
e J Brig , PE SE s
19813 4
�sjCNAL �'1
Prlgkt -[—ngineering Inc Consulting Structural and Civil Engineering
September 30, 2008 S - BEI# 116 03R
��VIM,- JIBS
Parametnx, Inc. f, a
Attn. Stan Cruse,Protect Manager 1010
2102 N Pearl Street, Suite 301D6RLE
0
Tacoma,WA 98406 oh
RE PORT ANGELES INTERNATIONAL GATEWAY—Plaza Dei f or.,
Response to Mr Tracy Gudgel Comments ��UoeNGF
4o�FS
Dear Stan.
The following is our response to the information request by Mr Tracy Gudgel in his letter to
Mr Jim Lierly,dated September 22,2008
Item 1
Delamination/Spall under PB3 at Grid 8/B has been monitored by the contractor and CM since it
was first observed. Our field reports from site visits have noted our observations, opinions, and
recommendations.
The following are beam Dead Load (DL) and Live Load(LL)reactions under beams supported
along Grid 8
Beams PB3 and PB5 at 8B and 8C, respectively-Total DL=215k and LL=50 k
Beams PB5A, PB7, and PB7 at 8D, 8D3 and 8D6,respectively—Total DL=87 k and LL=50 k
Total DL(Dead Load) are all permanent loads including pavers, topping and soil. Minimum width
of bearing required under total ultimate Dead Load is under 5",which is approximately 5'/s"that Mr
Gudgel measured at the deepest location.
Item 2
During the site visit of August 21, 2008, we observed some horizontal and diagonal hairline cracks
on the wall emanating from the bottom comer of the framing beams along Grid 8 These cracks
coincide with the reentrant comer of the wall blockout for the PT beam as well as the location of
concrete anchors that supported the horizontal walers. The temporary walers were installed to
facilitate backfill behind the wall before the plaza deck was placed.These cracks are not of concern
since they may have developed even if the beams were not present because of the reentrant corner
� b C PLL5
6 Mr Stan Cruse,AIA,LEEDv.2 AP
September 30,2008
Page 2 of 2
Item 3
Our site visit report dated September 2, 2008, cited by Mr Gudgel,noted the observed cracks and
crack pattern, and when they were first noticed by the field personnel. Again,it was reported that
they were first observed during a period of elevated temperatures. The crack location and pattern
does fit flexural or shear cracks and we did not attempt to determine the cause simply because of the
inordinate number of variables, including temperature. The slab is reinforced for temperature in that
direction. /10 C Ct�G
Item 4
We have provided our best technical explanation in our letter dated September 19,2008 Please note
that beam PB5 on Grid 8C has the same magnitude of reaction as the beam in question,but higher
post-tensioning force; and that the vertical rebar in the wall extends through the construction Joint
beam pocket into the beam. This restrains the beam from rotating freely, as noted in our last letter
The presence of sand and silt was reported in our site visit report dated March 19, 2008 The
infiltration of silt occurred before the waterstop was placed around the construction joint.
Item 5
We have observed the cracks and have recommended in our letter,dated September 19, 2008,that
the topping slab and pavers be placed on the deck, and have recommended repairs be made after
that. This repair could be made Just like the others ahead of adding loads to the deck, but we think it
is prudent to impose all permanent loads before repair is made.
To conclude, cracks are inherent in any concrete structures, and as the Structural Engineer of
Record, we have no reservation for the placement of topping slab and pavers, and we welcome any
technical proof that states otherwise.
Please contact me if you have any questions.
Best Te rds, _
`A4 /I'
c�e J Brig t,PE SE
C , 19813
R:ti L
SS14NAL ��G
A 41
CUIFN.G'INEE�j���G ,
�. c � s
IAN D'SUkNtVJNNG: '
Priv k- ..k,. ,,_.. y '
`+ 3 `Ft., &.
HO, VIP e
& ASSOCIATES 301 East 6th Street,Suite 1
Port AngelesNashmgton 98362
1 N C 0 R P 0 R A T E D
(360)417-0501
September 29 2008 Fax(360)417-0514
E-mail:zenovic@olympus.net
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway—West Parking Garage
Dear Mr Lierly
This is a follow up to the inspection I performed with you at Gateway West Parking Garage on
September 23, 2008. This inspection included several representatives from the City of Port
Angeles, a representative from Exeltech, and two representatives from Primo Construction. I
have also reviewed structural site visit reports#1 and#4 for the parking garage. Based on the
inspection and a review of the documentation noted above the following additional information is
requested from the engineer-
1 The engineer shall address the migration of the cracks in the deck slab from the time
of the July 30 2008 inspection (report#4)to present. Based on Exhibit A, provided
by Primo Construction, a number of the cracks have increased in length and
additional cracks have occurred Please address the recommendation in site visit
report#4 that no physical crack control measures be implemented for at least two
years Also provide proposed recommendations for repair of the cracks in the upper
deck slab
2. The engineer shall provide an analysis of the cracks occurring in the post-tensioned
(PT) beams at the inside face of the concrete shear walls in the east/west direction
There are three semi-vertical cracks which have developed at each end of each PT
beam near the inside edge of the concrete shear walls These can be seen on
pictures#1 #2, #3, and #4 Please address the fact that the stirrup spacing shown
on detail 8/S8 changes at this same location and the fact that the shear walls appear
to be providing vertical support of the PT beams
3. Please address the cracking in the west wall of the structure along Grid Line
0 1 Provide an explanation as to cause of cracks and proposed repair methods if
any These cracks occur at a number of locations and can be seen in pictures#8 9
10 11 12, 13 14 15 16 and 17
4 The engineer shall address the cracking issues noted in items 1 through 3 above
with any required fixes and shall provide a statement that the cracking noted above,
with any proposed fixes, does not compromise the structural integrity of the structure
Please call me if y u have any further questions on this matter
Sincerely
Tracy Gudgel P E o��tis cToti
Fc: JN 08091
1r 4
R
�tOFESFJSGlpS14�'
D °
�M(g
CSO USST RUC6 u yoxy flbwc. Project Manager James Bartee
970 Carlsborg Road Sequim,WA 98382 Project Superintendent Roland Ordona
(360)683-5447 Fax(360)683-6475 Project Gateway
e-mail: rolando@primoconstructioninc.com Project No 702203
SHORT DURATION SCHEDULE Date. 25-Sep-08
/.'=
Month SEPTEMBER SEPTEM BER SEPTEMBER/OCTOBER OCTOBER
Work Items Week Previous Week Current Week 2nd Week 3rd Week Subcontractor
Day S M T W TH' F I S S M T WITH F I S S M T W TH F S S M T W THI F S
Date 14 15 16 17 18 19120 21 22 23 24 25126 27 28 29 30 1 2 3 4 5 6 7 8 —9][-10— 11
Progress/Principal Meeting X/P X X
TRANSIT BUILDING
Mechanical X X X X X X X X/EX X Miller Sheet Metal
Flooring/Tile X X X X X X X X X X X X Rubenstein's
Stucco/Ceiling Tile X X X Goettlin
Paint/Sealers X X X X X Hoggatt
Toilet Partitions X X X Primo
Electrical X X X X X X X X X X X X X X X Olympic Electric
Plumbing X X X X X X X X X X Cool Water
Pavilion/Plaza/Clock
M E.P X X X X X X X X X X X X X X X X X X X X Oly Elec./Cool water/Miller
Sitework X X X X X X X X X X X X X X X X X X X X Primo
Painting/Sealing D R X X X X X X X X X Hoggatt
Concrete Finish X X X X X X X X X X X X X X X X X X X X Primo
Elevator X X X X X X X X X X/P X X X X Schindler
"T Line Pre X/F X X P X X/F X X X X X X X X X X X X IPrimo
WEST GARAGE
Deck Sealing X X X X X X X X X X X Primo
Structural Steel X X X X X X X X X X X X X X X X X X X X Primo
Bike Racks S/>
/ X/C Primo
C = Complete
D = Delay
R = Resume
S = Start
X= Progress
c
I . OjRTANGELES,
--
WASHINGTON, U S A
a�
MEMO September 24, 2008
DEPARTMENT TO Nathan West, Director
OF
COMMUNITY FROM. Sue Roberds, Planning 14
& ECONOMIC Jinn Lierly, Building Inspector
DEVELOPMENT
RE Gateway Inspections
Nathan West Following is a short history of events surrounding a recent inspection at the
Director
417-4751 Gateway construction site that caused Jim Lierly, Building Inspector, to ask for an
outside inspector to verify certain discrepancies at the site.
Sue Roberds
Planning Manager Jim Mahlum asked Jim Lierly to do a site inspection in review of signage at the
417-4750
Gateway site. While there, the two Jims walked through the plaza parking area.
Scott Johns Jim Mahlum pointed out significant spallmg in the concrete and cracks in an
Associate Planner overhead beam. It was determined after a group conversation in the office that
417-4752 Tracey Gudgel from Zenovic &Associates would be contacted to review the
Daniel Bialzik engineering issues. Jim Mahlum agreed. Excel Tech was contacted and requested
Assistant Planner to provide engineering data immediately
417-4804
Tracy Gudgel and Jim performed a site visit, and Tracy noted the cracking and
Jim Lierly
Building Inspector expressed concern with cracks in an overhead beam. He wanted to know if the
417-4816 cracks were due to deflection. Jim Lierly asked for pertinent engineering info from
Excel Tech rep Ingo Ingo said their engineer was working on the matter and they
Patrick Compliance,
would forward reports and all data pertaining to the issue to Jim Lierly ASAP It
Code Compliance,
Building Inspections was expected that the data would be received by the City by the following Monday
417-4712 (9/8) The information was not received by the Building Division until Thursday
(9/18) of the following week. Jim Mahlum had received some information in a
Linda Pangrle timely manner but did not forward it to Jim Lierly until a week later because the
Permit Technician
417-4815 Information was incomplete.
Fax Tracey again reviewed the Information and determined that the data was still not
360-417-4711 complete enough for him to make a determination. Jim Lierly then Issued an e-
mail to Exel Tech stating that no further loading or pouring of concrete or heavy
equipment could occur on the (east)plaza deck. He also spoke in person with the
contracting site manager(Roland) This was short of a stop work order and meant
for the plaza deck only
Later that day, Jim L phoned Roland to verify receipt of the email and to make sure he
understood the direction. Roland supplied Jim L. with an e-mail from Exel Tech s Ingo
stating "DO NOT stop work unless a red tag is posted." (Copy of email in file) Jim L.
contacted Ingo and assured him that this was a partial stop work on the deck of the plaza and,
if necessary, a stop work order would be issued. He agreed to stop work until the matter is
resolved.
RECOMMENDATION.
Continue stop work, or issue a stop work order if work is not stopped until engineering is
received to ensure that work is sound.
P FORMS\Sue's Daily Work\GatewayMemo.wpd
AL
R G
301 East 6th Street,Suite I
& ASSOCIATES Port Angeles,Vlashington 98362
6x(360)417-0514
E-mail:zenovic@olytnpus.mz
September 15 2008
Mr Jim Liady
Building Inspector
City ofPort Angeles Department mfCommunity Development
321 East Fifth Street
Port Angeles, VVAS8382
SUBJECT Port Angeles International Gateway
Dear Mr Lier|y-
Aaafo||ovvupioc|orifvmy |etterdatmdGapbernbar12' 2UOGvvamranaquestingthattha
engineer provide structural calculations for the issues noted in the letter Due tothe
extensive epa||ing/de|anninaUonatPB3 the engineer needs toprovide calculations to
show that itis safe toadd additional load bzthe beam prior hzpouring mfthe topping
a|ob There appears tobe only approximately 0inches ofbearing support remaining due
to the extensive spal Ii ng/dela m i nation and the calculations must show that this is
adequate prior to placing additional load
The engineer shall also provide calculations using the actual temperature data for Port
Angeles over the time period the cracks developed toshow that the cracks inbeam PB3
are caused bytemperature cracking and not caused bydeflection
Based onthe documentation provided itappears that the npa||inQ/de|arhinabonot the
east end of the other beams was minimal innature and otthe time ofnnyinspection
some repair work had been performed The engineer shall provide calculations to show
that the beam supports were not compromised bythis apa||ing/da|arninoUon
Documentation and inspection reports shall also be provided to show that the repair
work was performed 0omeet the satisfaction ofthe engineer
Please call nno )fyou have any further questions onthis mattmr
Sincerely
TrocrGudge| P E.
Fc: JN 08091
4
0�&� ASSOCIATES 301 East 6th Street,Suite 1
Port Angeles,Washington 98362
INCORPORATED (360)417-0501
Fax(360)417-0514
E-mail:zenovic@olympus.net
September 12, 2008
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
As you know I have performed an inspection at the site noted above to review the
spalling/delamination under the east ends of the post tensioned beams and also the
cracks in beam P133 I have also reviewed the correspondence regarding this issue
which you dropped off at my office.
Based on my inspection and review of the documentation it is my recommendation that
no additional weight be added to the structure until the engineer has addressed the
issue of whether the structural integrity of beam P133 and its support wall have been
compromised by the spalling/delamination at the east end. The engineer should also
address the vertical cracks in the beam and provide justification that these cracks are
truly expansion/contraction cracks due to temperature changes and not due to deflection
in the beam The repair work for the spalling/delamination issues already performed at
the east end of the other beams should also be addressed
Please call me if you have any further questions on this matter
Sincerely,
Tracy Gudgel, P E. Of
Ir WA
Fc: JN 08091
AI
Fc: `eco
2777
r �
SSf�N��G
(9/18%2008) Sue Roberds-'Memo on Inspection...._.......__....
From Nathan West
To, Sue Roberds
Date: 9/17/2008 5 00 PM
Subject: Memo on Inspection
Attachments: PA International Gateway of
Sue,
Please work with Jim to provide me with a draft memo(addressed to DCED)on this issue that I can use for discussions
with Glenn and Jerry The memo should detail how we arrived at the attached letter and have the following specifics:
1 The reason or purpose of any inspections dates)and time�
.The items/issues of concern identified during those inspections
-3' Identification of correspondence and other details referred to in Tracy's letters
i Summary of recommendatio;e;
Jim and/or Tracy as a result of those inspections including any actions to be taken
by the developer
5. Please reference and attach tters from Tracy �l,�
Thanks
Nathan
>>>James Lierly 9/15/2008 1143 AM >>>
Jim Lierly
Building Inspector
City of Port angeles
360-417-4816
it ierly(�citvofoa.us
>>> 'Nikki Dawley' <zenovicCaolympus.net> 9/15/2008 11.31 AM >>>
Here you go.
Thank You,
Nikki Dawley
Zenovic&Assoicates,Inc.
(9/23/2008) Nathan West- Fwd- Gateway Page 1
From James Lierly
To: Nathan West; Sue Roberds
Date: 9/23/2008 8 49 AM
Subject: Fwd Gateway
Attachments: Itr scan 09-22-08 tif; 1 jpg, 2.jpg, 3.jpg, sketch of
Nathan I have just received this email and wanted you to have time to read the letter I will forward to all when you give
me the go ahead.
Jim Lierly
Building Inspector
City of Port angeles
360-417-4816
jlierly@cityofpa.us
>>> 'Tracy Gudgel' <tracy@zenovic.net> 9/23/2008 8:35 AM >>>
Jim,
Here is the letter my sketch,and three of the pictures originally sent.
The remaining pictures are in the original hard copy you picked up this
morning.When I open up the letter on my computer in this email both pages
including my signed stamp which Stan Cruse stated wasn't there. Since
public works was in a hurry for this letter I did not reference the picture
number in the report. Please see below for a description of the the three
pictures I am sending attached.
Picture#1 shows the extent of spalling(6 1/2 maximum)and the dirt and
fines on the bottom of the beam.
Picture#2 shows the 45 degree crack extending out from the bottom corner of
the beam on the north side.
Picture#3 shows a small void in the bottom of the beam,it also shows the
dirt and fines that would inhibit bonding between the beam and the wall.
Tracy Gudgel
Zenovic&Associates,Inc.
Record of Communication
Staff Member Name J i m L 1 F- iZUE4JU ate
Name of Individual Contacted.
1� , e
Subject: �.cJO
Issues discussed.
kk C�y�/,ZdS JI ;v, 11i1i6C Lemli-�6L�'
L yvip f-L J l,,J
zd& Z) rYtbn--F C I X--f
Q ESQ' � cs Q
w G 4 v
o4A L eyLis-
-
IM V
1� d1:24 ! ,
G
fec (1)
C G 4-)
4/2/2009 Nathan West Fwd Gateway Page 1
From James Lierly
To: Nathan West; Sue Roberds
Date: 9/23/2008 8 49 AM
Subject: Fwd Gateway
Attachments: Itr scan 09-22-08 tif; 1 jpg, 2.jpg, 3 jpg, sketch of
Nathan I have just received this email and wanted you to have time to read the letter I will forward to all when you give
me the go ahead.
Jim Lierly
Building Inspector
City of Port angeles
360-417-4816
jlierly@cityofpa.us
>>> 'Tracy Gudgel' <tracy@zenovic.net> 9/23/2008 8:35 AM >>>
Jim,
Here is the letter my sketch,and three of the pictures originally sent.
The remaining pictures are in the original hard copy you picked up this
morning.When I open up the letter on my computer in this email both pages
including my signed stamp which Stan Cruse stated wasn't there. Since
public works was in a hurry for this letter I did not reference the picture
number in the report. Please see below for a description of the the three
pictures I am sending attached.
Picture#1 shows the extent of spalling(6 1/2 maximum)and the dirt and
fines on the bottom of the beam.
Picture#2 shows the 45 degree crack extending out from the bottom corner of
the beam on the north side.
Picture#3 shows a small void in the bottom of the beam, it also shows the
dirt and fines that would inhibit bonding between the beam and the wall.
Tracy Gudgel
Zenovic&Associates, Inc.
f'
( 3
POGGEMEYER SEP 9 4 ong3
DESIGN GROUP
4
September 22,2008
Mr James Bartee
Owner
Primo Construction, Inc.
970 Carlsborg Road
Sequim,WA 98382
Dear Mr Bartee: '
RE: Port Angeles International Gateway
West Parking Garage
Port Angeles,WA
In regards to the concrete cracking,the following commentary is presented:
1. Wall crack repairs can be implemented any time after 90 days of pouring,as about 2/3rds of the
total shrinkage has already occurred. It is not necessary to wait two years,as was recommended
in our site visit report of July 30,2008. It is now understood that waiting two years may not be a
viable option in terms of completing the project. Furthermore,the amount and degree of
cracking from the 90 day period to the two year period is likely not to be significant.
2. The epoxy injection method is appropriate for wall repairs.
3. The cracks at the elevated deck can be repaired with a crack healer/penetrating sealer A
product such as Sikadur 55 SLV is appropriate for this application.According to the manufacturer,
it"penetrates/seals surface of slabs from water absorption,chloride-ion intrusion,and chemical
attack."It also"structurally improves the concrete surface"
4. The Sikadur product will require pre-treatment under the cracks,so the product does not leak
out. Use a product below the cracks such as Sikagard 670W(acrylic base)or Sikatop 144(cement
base).These product have been recommended by the manufacture to work with the surface
sealer
S. The deck sealer may be used locally or over the entire surface of the deck. It is recommended
that a trial crack be address initially to assess installation techniques and measure performance.
6. As always,apply the products in strict accordance with the manufacturer's recommendations.
512 8th Street South,Suits 2021 Kirkland,Washington 98033 1 P 425.827.59951 www.poggemeyer.00m
" POGGEMEYER
DESIGN GROUP
Port Angeles International Gateway
West Parking Garage
September 23,2008
Page 2
Should you have any additional questions or comments, please feel free to contact
US.
Regards,
Robert Bourdages, P.E.
Principal
Poggemeyer Design Group, Inc.
P� O. B0V'QO
aogj SOF%
i or ~ z
7 �
t,7
Y6NAL
CIVIL ENGINEERING
LAND'SURVEYING
& ASSOCIATES 301 East 6th Street,Suite 1
2Port Angeles,Washmgton 98362
I N C O R P O R A T E D
(360)417-0501
Fax(360)417-0514
E-mail:zenovic@olympus.net
September 22, 2008
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
As requesting this is a foll�p to my previous letters and to the meeting I attended this
morning with yourself Gfenn Cutler Jim Mahlum Nathan West, and Sue Robards to
clarify the information we are requesting prior to pouring the topping slab on the project.
After the meeting I again visited the site and took pictures and created a basic sketch of
what is occurring at the bearing point of beam PB3 and the wall to send to Ade Bright. I
spoke with Ade this morning prior to the meeting and told him I would send him
additional pictures and information so that he could see the diagonal cracks in the wall
below the beam as well as the depth of the spalling/delamination under the beam that
was discussed this morning The following information is requested prior to allowing
placement of the topping slab
1) Calculations shall be provided to justify the September 22 2008 letter
from Bright Engineering that repairs are not required prior to final
loading It appears based on my inspection and as shown in the
attached photos that the spalling/delamination extends for a depth of
6 '/2 into the wall This leaves only approximately 5 1/2' of bearing at
the wall The calculations shall justify that the remaining bearing area
is adequate to support the additional loads imposed by the addition of
the topping slab
2) There are also two cracks extending down the wall diagonally below
the beam PB3 one at approximately 45 degrees and one at
approximately 60 degrees, as shown on my attached sketch which I
mentioned to Ade this morning There is also a horizontal crack in the
approximately in line with the bottom of the beam This horizontal
cracking can be seen in several locations along the east wall line. It
should be noted that there are stress cracks extending downward in
the walls from near the corners of every beam where they interface
with the walls along the west and east sides of the structure which
were noted in my inspection today The cracking in the walls shall be
addressed in the calculations and letter of response
y
3) Bright engineering shall also address the vertical cracks in beam P133
located west of PB11 which extend through the beam and into the
slab In previous documentation reviewed by this office is was noted
that they are temperature cracks. Bright Engineering shall provided
calculations using City of Port Angeles temperature data to justify that
these cracks were caused by expansion or contraction due to
temperature changes.
4) The engineer shall provide an explanation as to why the cracks and
spalling/delamination noted above have occurred It should be noted
that in my conversation with Ade this morning he feels that the spalling
was caused by bonding between the wall and beam and that it
occurred as the inside face of the beam lifted off the wall During my
inspection this morning there appears to be no indication of bonding
between the wall and the beam and in fact there is a fine layer of dirt
and fines left on the bottom of the beam which would inhibit bonding
5) The certifying engineer shall provide in writing an assurance that the
spalling and cracking issues have been inspected and that it is safe to
proceed with construction specifically the addition of the topping slab
along with the other permanent dead loads.
It is the opinion of this office that additional permanent dead loads should not be placed
on the structure until the items noted above have been addressed to the satisfaction of
the building department. That said as was discussed this morning in the meeting it is
my opinion that the contractor may proceed with the use of man lifts to finish work on the
pavilion and clock tower forming on the deck for the topping slab and placement of the
bridge deck concrete while the issues noted above are being addressed Please note
that additional questions may arise based on the comments received and additional
documentation may be required.
Please call me if you have any further questions on this matter
Sincerely,
Tracy udgel P E.
Fc: JN 08091
08
N
i
r
r
"s
LL,,,JZ7
�a"
a
2k
v�
Volo
uq'o/j
�v �s
J
� I
r• s
11 6p A ;
09 / 22 / 2008
m
CO
N
N
N
CD
O
I
_ I -
•
i
7;
All -
.1, y
. � Q
I
qtr
K`
09 / 22 / 2008
lk
•
1
jig A
r
09 /22 /2008
,t.
09 / 22 / 2008
,
t
1
r
1
Y
per- 4
.r,
lti .
09 / 22 / 2008
1.
hP y j
s
• a a
♦ a
dr
T
n
09 / 22 / 2008
p
t
{ I a
yf s
09 / 22 / 2008
J�
,p 1
P :•S
,1,
f •
�t 0
1
AIL
It
• 1
,�
S
l
09 / 22 / 2008
f q
r
r ►-
. r•,7
s +
09 / 22 / 2008
8002 / ZZ / 60
_
�a
f
N
-ak 09 / 22 / 2008
09 / 22 /2008
r
L
i
fi
1r-
09 / 22 / 2008
7
Uric��'c n�!neer!n Inc Consulting StrRECHWED
an !vi FT
CITY OF PORT ANGELES
Dept.of Community Development
September 19 2008 BEI# 116.03R
Parametrix, Inc.
Attn. Stan Cruse, Project Manager
2102 N Pearl Street, Suite 301
Tacoma,WA 98406
RE PORT ANGELES INTERNATIONAL GATEWAY
Plaza Deck
Dear Stan
This letter is in response to James Dugan s e-mail sent this morning regarding loading the plaza
deck.
In my site visit report dated September 2, 2008, and in my discussion with Ingo during my visit, I
stated the topping slab as well as all superimposed loads, such as pavers, etc.,be placed on the plaza
deck.
The plaza deck beams and slab post-tensioning force was designed to support the weight of the
concrete and all superimposed dead loads, and all other permanent added loads. -
This post-tensioning force induces upward camber, and therefore tension,on the upper surface of the
concrete deck until all design loads are in place. In order to alleviate any adverse long-term effects of
not negating the post-tensioning forces, it is necessary, and without question, to add the topping slab
and other loads on the plaza as designed.
The addition of these loads would change the internal stresses in the beams and slabs as well as the
camber and end rotation at the support to meet design requirements. The attached hand sketch
illustrates the rotation at the end of the beams or slab The loading stages and load path mechanism
is as follows.
The Red Line is the original honzontal position of the beam, before PT while supported on
falsework.
When the post-tensioned(Blue Line), the beam lifts upwards (or hugs) and separates from the
falsework. As a result, the ends of the beam would rotate such that the bottom of the beam moves
away from the support (or wall in this case)
This resulted in spalling of concrete directly below the beam support.
Mr Stan Cruse,AIA,LEEDv.2 AP
September 19 2008
Page 2 of
When fully loaded (Green Line), the beam would deflect downward (or sag) and the beam-end
rotation would push the bottom of the beam into the wall
As stated in my field report,the spalls would be repaired after the topping and pavers are in place.
Please call me if you have any questions.
Best regards,
e J Braga tC PE, SE
-Pri,3kt C—ngneer,ng Inc. Consulting Structural 8 Civil Engineering
1848 P,venua Suite 1100 SeaMe,YVA 98101 (206)625-377 4 max(206)6254)185 4 info@bdghteng.com
Pegtar,-'No.
{Vn
S UBJFCT —Vim BY
s
LL
I O
CL
i
m
r � O
t — Ui
fl
W
co
� Q
•0 o W
CITY OF ,
ORTP. NGELES
A
W
A S H I N G T O N, U S A
MEMO September 19, 2008
DEPARTMENT TO Nathan West, Director
OF
COMMUNITY FROM. Sue Roberds, Planning Manager
&ECONOMIC Jim Lierly,Building Inspector
DEVELOPMENT
RE Gateway Inspections
Nathan West Following is a short history of events surrounding a recent inspection at the
Director
417-4751 Gateway construction site that caused Jim Lierly, Building Inspector, to ask for an
outside inspector to verify certain discrepancies at the site.
Sue Roberds
Planning Manager Jim Mahlum asked Jim Lierly to do a site inspection in review of signage at the
417-4750
Gateway site. While there, the two Jims walked through the plaza parking area.
Scott Johns Jim Mahlum pointed out significant spalling in the concrete and cracks in an
Associate Planner overhead beam. It was determined after a group conversation in the office that
417-4752 Tracey Gudgel from Zenovic &Associates would be contacted to review the
Daniel Bialzik engineering issues. Jim Mahlum agreed. Excel Tech was contacted and requested
Assistant Planner to provide engineering data immediately
417-4804
Jim Lierly Tracy Gudgel and Jim performed a site visit and Tracy agreed that there was a
Building Inspector concern with cracks in the overhead beam and wanted to know if the cracks were
417-4816 due to deflection. Jim Lierly asked for pertinent engineering info from Excel Tech
rep Ingo Ingo also said their engineer was working on the matter and they would
Patrick Bartholick forward reports and all data pertaining to the issue to Jim Lierly ASAP It was
Code Compliance, expected that the data would be received by the City by the following Monday
Building Inspections
417-4712 The information was not received until Thursday of the following week by Jim
Mahlum but not forwarded to Jim Lierly until a week later because it was
Linda Pangrle incomplete and Jim M. didn't want to forward incomplete information.
Permit Technician
417-4815
Tracey again reviewed the information and determined that the data was still not
Fax complete. Jim Lierly issued an e-mail to the contractor (Exel Tech) stating that no
360-417-4711 loading or pouring of concrete or heavy equipment could occur on the plaza deck;
he also spoke in person with the site manager(Roland) This was short of a stop
work order and meant for the plaza deck only
Later that day Jim L phoned Roland to verify receipt of the email and to make sure
ac understood the direction. Roland supplied Jim L with an e-mail from Exel
- rech's Ingo who told Roland to continue vorkmg unless a stop work order was
issued. Ingo replied "DO NOT stop work unless a red tag is posted. (Copy of email in file)
Jim L. contacted Ingo and assured him that this was a partial stop work on the deck of the
plaza and, if necessary, a stop work order would be issued. He agreed to stop work until the
matter is resolved.
RECOMMENDATION.
Continue stop work,or issue a stop work order if work is not stopped until engineering is
received to ensure that work is sound.
TAFORMS\Sue's Daily Work\GatewayMemo.rvpd
� Il
CONSTRUCTION, INC
Commercial&Residential Building Concrete Excavation
Utilities Custom Homes Sand&Gravel
September 19,2008
Ingo Goller
Exeltech Consulting,Inc.
116 W 8h Street, Suite 120
Port Angeles,WA 98362
RE. Plaza Deck Delay
Dear Ingo
The intent of this letter is to inform Clallam Transit that Prim Construction,Inc. is
currently experiencing delays on this project. These delays are the result of a"stop
work"direction on the Plaza Deck,given by both the building inspector and Exeltech.
Due to these circumstances,it is unclear at this time as to the impact to both the schedule
and the cost of the project. Once this issue is resolved,we will gather all information
necessary and submit it to you as part of our contractual agreement.
Thank you for your attention in this matter
Sincerely,
4nnifer Howe
ct Administrator
Primo Construction,Inc.
970 Carlsborg Road Sequim,WA 98382 (36o)683-5447 Fax(36o)683-6475
Cont.Uc.#PRIMOC1133P7
Bright -E—ng,neering Inc Consul ing Structural and Civil Engineering
September 18, 2008 BEI# 116 03R
Parametnx,Inc.
Attn. Stan Cruse
2102 N Pearl Street, Suite 301
Tacoma, WA 98406
RE PORT ANGELES INTERNATIONAL GATEWAY
Plaza Deck
Dear Stan.
This letter is in response to James Dugan s e-mail sent this morning regarding loading the plaza
deck.
In my site visit report dated September 2, 2008, and in my discussion with Ingo during my visit, I
stated the topping slab as well as all superimposed loads, such as pavers, etc. be placed on the plaza
deck.
The plaza deck beams and slab postensioning force was designed to support the weight of the
concrete and all superimposed dead loads, and all other permanent added loads.
This postensioning force induces upward camber, and therefore tension,on the upper surface of the
concrete deck until all design loads are in place. In order to alleviate any adverse long-term effects of
not negating the postensioning forces, it is necessary, and without question, to add the topping slab
and other loads on the plaza as designed.
The addition of these loads would change the internal stresses in the beams and slabs as well as the
camber and end rotation at the support to meet design requirements.
Please call me if you have any questions.
F L�n •9
Best re ards,
iAdeJ Bngh , , SE
v '' �xx t
/.
'RALEt�C'`
' `ssI LW
From Nathan West
To: SueRobenjs
Date: 9/17/30085'00PM
Subject: Memo onInspection
Attachments: PA International Gatevvaytif
Sue,
Please work with Jim to provide me with a draft memo(addressed to DCED)on this issue that I can use for discussions
with Glenn and Jerry The memo should detail how we arrived at the attached letter and have the following specifics:
1.The reason orpurpose o[any inspactinn($daUe(o)and Ume(y)
2.The items/issues o[concern identified during those inspections
3 Identification of correspondence and other details referred to in Tracy's letters
4 Summary of recommendations from Jim and/or Tracy as a result of those inspections including any actions to be taken
bythe developer
S Please reference and attach the two letters from Tracy
Thanks
Nathan
>^>James Uedyg/15/2OO8111jAM >p>
]imUedy
Building Inspector
City ofPort ange|os
360'*17'4010
^»> 'Nikki Dawley' < ^9y15/ZOO8zz.]1AM >^^
Here you go.
Thank You,
Nikki Dawley
zenov|c&Asso|caus,mc
„« ?e
ia� t 'ilr•,�a4� - F�,�:e°I"z,�Y,�t.:�.:�� '�` � � � �. `: i, f a'TTk '3I�f='G�i`r'�.�"�-` ""�' :gt�'.ii:x�^ `° "�,
4�&;,y;; n�• ,_..k�+� .: ;.qr^5�”,
Y.. v: SIM a� ��IVIN,CY' G i' y{r
�' I� - (h. «#! �'Si a:.s`'.&:... « -c1.' ..;'Y •yw�1! ��.. .M,};a�µ�e^wi',a_ J,^Y d:'- �;: .•''tY. �'��_ +raik,�"^i.'
�`Sic.� 21' '�}' .:+t:.'�" _ _ w ,,, .�;. .:b"jH.»"�' «� =3..: $'�:p :�.'=<• 'f',t,VH.. _.,. �, ,� t�f.�s.�S'�iSp'3�tJ'[1'Y'.1:+�'1Y, ^a„a�
4L, ' iS C s t II
& ASSOCIATES 301 East 6th Street,Suite 1
Port Angeles,Washington 98362
1 N C 0 R P 0 R A T E D (360)417-0501
Fax(360)417-0514
E-mail:zenovic@olympus.net
September 15 2008
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly-
As a follow up to clarify-my letter dated September 12, 2008 we are requesting that the
engineer provide structural calculations for the issues noted in the letter Due to the
extensive spalling/delamination at P133 the engineer needs to provide calculations to
show that it is safe to add additional load to the beam prior to pouring of the topping
slab There appears to be only approximately 6 inches of bearing support remaining due
to the extensive spalling/delamination and the calculations must show that this is
adequate prior to placing additional load
The engineer shall also provide calculations using the actual temperature data for Port
Angeles over the time period the cracks developed to show that the cracks in beam P133
are caused by temperature cracking and not caused by deflection.
Based on the documentation provided it appears that the spalling/delamination at the
east end of the other beams was minimal in nature and at the time of my inspection
some repair work had been performed The engineer shall provide calculations to show
that the beam supports were not compromised by this spalling/delamination
Documentation and inspection reports shall also be provided to show that the repair
work was performed to meet the satisfaction of the engineer
Please call me if you have any further questions on this matter
Sincerely
Trac Gudgel P E.
�w4Ks o
Fc: JN 08091
kr.
�Ut��5f0;11ti�
NOME=
& ASSOCIATES 301 East 6th Street,Suite 1
Port AngelesMashington 98362
INCORPORATED (360)417-0501
Fax(360)417-0514
E-mail:zenovtc@olympus.net
September 12, 2008
Mr Jim Lierly
Building Inspector
City of Port Angeles Department of Community Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT Port Angeles International Gateway
Dear Mr Lierly
As you know I have performed an inspection at the site noted above to review the
spalling/delamination under the east ends of the post tensioned beams and also the
cracks in beam P133. I have also reviewed the correspondence regarding this issue
which you dropped off at my office
Based on my inspection and review of the documentation it is my recommendation that
no additional weight be added to the structure until the engineer has addressed the
issue of whether the structural integrity of beam PB3 and its support wall have been
compromised by the spalling/delamination at the east end. The engineer should also
address the vertical cracks in the beam and provide justification that these cracks are
truly expansion/contraction cracks due to temperature changes and not due to deflection
in the beam. The repair work for the spalling/delamination issues already performed at
the east end of the other beams should also be addressed
Please call me if you have any further questions on this matter
Sincerely
Tracy Gudgel, P E. RI1��g
Fc: JN 08091
T ?'
(,t 327
SSIp�lvAL 6NG
[(9/12/2008)JamesLierly RE_ Gateway Project Page 1
From Ingo Goller<igoller@xltech com>
To Roland Ordono <roland@primosequim com>
Date 9/12/2008 1006 AM
Subject: RE Gateway Project
CC Jennifer Howell <jen@primosequim com> James Lierly[Jlierly@cityofpa u
Roalnd
DO NOT stop work! A stop work order has not been issued Thank you contacting me but do not stop
work unless I direct you to do so This is an issue relating to the delaminations in the east wall of the
plaza garage and we are trying to keep Mr Lierly in the loop on the ongoing developments
Ingo Goller PE
Construction Manager
Exeltech Consulting Inc
116 West 8TH Street, Suite 120
Port Angeles, WA 98362
igoller@xltech com
Ph 360 417 3803
Fax: 360 417 3097
Sustainable Engineering Solutions for a Changing World * People Not Companies Deliver Projects
Disclaimer- The attached files and/or text within this e-mail message are the property of Exeltech
Consulting, Inc Reuse of the files for any other purpose without authorization is strictly prohibited
Exeltech Consulting Inc shall not be held responsible for any and all losses claims or liabilities
associated with the unauthorized use interpretation or modification of the files or text.
From Roland Ordono
Sent: Fri 9/12/2008 9 56 AM
To Ingo Goller
Cc- Jennifer Howell
Subject: FW Gateway Project
Ingo I received this today and I don't see you CC'd on this Am I
supposed to communicate with the building dept. directly? Is this a stop
work order at the plaza deck? Please advise
-Original Message-
From James Lierly[mailto.Jlierly@cityofpa.us]
Sent: Friday September 12 2008 9.05 AM
To Roland Ordona
Subject: Fwd Gateway Project
>>> James Lierly 9/12/2008 9.02 AM >>>
Jim Ingo I would like to have the engineers contact information that
is responsible over the issues at the Gateway garage Also i would will
need the full report for the issues in the Garage including but not
[9/12/2008)James Lierly RE. Gateway Project , �_ Page 2
S
41
'A limited to the cracks in the beams (running east and west)
r,
Also provide the documentation for the west parking garage that details
the parking spaces not meeting the requirements in the parking space's
handout.
Also any meetings and or correspondence for this project needs to be
brought to my attention in advance
At this point i do not want any work or loads added to the plaza deck
until i have had time to review the data and consult with the engineer
of record and our third party
Jim Lierly
Building Inspector
City of Port angeles
360-417-4816
jlierly@cityofpa.us
________ __ _____9.��U
Y
� -�-
�� �
rage i or 2.
Ingo Goller
From: Ade Bright[ab@brighteng.com] Sent: Wed 3/5/2008 2:01 PM
To: Ingo Goller, roland@primoinc.org, pb@olympus.net; 'Jennifer Howell' rh@olympus.net
Cc: Roger Horton, Bill Alton; Jmahlum@cityofpa.us; Denis Miller* Lindsay Murray
Subject: RE. Delaminated Concrete 6 _
Attachments:
Ingo �1
I have a couple of question in looking at the picture
1 1 see some 3-2x around the beam. What are those for and are they embedded in the wall?
2. How deep is the delamination? Or is it scaling? Does the area have a hollow sound or crack around the
yellow mark? It may be necessary to chip out concrete around that area.
Ade Bright PE, SE
Bright Engineering, Inc.
From. Ingo Goller [mailto igoller@xitech.com]
Sent:Tuesday, March 04, 2008 9 39 AM
To: roland@primoinc.org, Patsy Busby [pb@olympus.net],Jennifer Howell, rh@olympus.net
Cc: ab@brighteng.com, Roger Horton, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us], Denis Miller; Lindsay
Murray
Subject: Delaminated Concrete
Attached picture shows the location of the delaminated concrete in the east plaza garage wall under the
bearing seat of PB 3 Please provide a repair procedure including intended materials proposed for addressing
the delaminated concrete At this time do not make any repairs until the engineer of record has reviewed the
delaminated concrete and your proposed repair procedure
Regards
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street,Suite 120
http.//mail xltech.com/exchange/igoller/Inbox/Projects/Gateway,'Construction/NE%20Retai 9/8/2008
JL ar,%+L V1 L
' Port Angeles,WA 98362
Ph:360.417.3803
Fax:360.417.3097
The attached files and/or text within this e-mail message are the property of Exeltech Consulting Inc. Reuse of
the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting, Inc shall not be.
held responsible for any and all losses claims or liabilities associated with the unauthorized use interpretation
or modification of the files or text.
http.//mall.xltecli com/exchange/igoller/lnbox/Pre;ects/Gateway/ConstructioniNE°%20Retai 9/8/2008
Page 1 of 1
AYou replied on 9/4/2008 7:57 AM.
Attachments can contain viruses that may harm your computer Attachments may not display correctly
Ingo Goller
From: Stan Cruse[SCruse@parametrix.com] Sent: Thu 9/4/2008 6.53 AM
To: Ingo Goller
Cc: James Dugan;Jim Mahlum[Jmahlum@cityofpa.us],ab@brighteng.com
Subject: Site Visit Report Bright Engineering
Attachments: D Site Visit Report 090308.pdf(2MB)
Ingo,
Attached is Bright Engineering site visit report and recommendations as requested.
Please call if you have any additional questions or need any additional clarification.
Parametrix
caalwd#n & — irrajFuiced de&'iocrre.—mdwf a q0wwe
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax-253 752.9865
cell: 360 710.6425
scruse@parametdx.com
http.//mail.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
6 right C—ngineering Inc Consulting Structural and Civil Engineering
SITE VISIT REPORT
Project Name: Port Angeles International Gateway Project No 116.03R
Date Prepared. September 2, 2008
Prepared for- Stan Cruse—Parametnx,Inc.
Prepared By- Ade Bright,PE, SE
I visited the site on August at the request of Ingo to observe the spall and continued delanunation
of the wall dust below the east end(Grid B)of beam PB3 Conditions of the beams along the east
wall were observed on March 11 2008 covered in the report dated March 19 2008 I was
accompanied by Ingo and Tom(Exceltech), Rolland and Jim(Pnmo).
Observations
1 Beam PB3
• Spalls under beams PB5 and PB5A have not increased and have been repaired.
• Spalls under beam PB3 have expanded to the north and toward the bottom of slab as
indicated on Figures 1 and 2. It has not extended to the south.
Based on several observations, it does not appear that the delamination is a result of relative
movement between the east wall and beam PB3 However in order to propose an effective
repair,this possibility needs to be eliminated. Targets could be marked on the rebar as shown in
Figure 2,near the soffit of the beam and another as low as possible, and a third at the base of the
wall in line with the other two This could be measured over time to record any movement.
It is my recommendation that this delammation not be repaired until after the topping slab is in
place. It is expected that delammation would have stabilized and that delammated concrete up to
the soffit of the slab would be removed and repaired.
2. Beam PB4(along Grid B)
It was reported that hairline cracks in slab and around beam PB3 was first observed about
three weeks ago This timeframe corresponds to a period of high summer temperatures and
after about nine months of curing. An elevation of beam PB3 and the crack pattern is shown
on Figures 3 and 4
180974A— Sita 1100 I S—tt�,\//A98101-1381 I pko 206.6,25.3777 I iw�:zo6.625.185i I of o 0�6rg�teng.om
Port Angeles International Gateway Site Visit Report
The crack in the slab leak in this area is primarily because of standing water on the plaza
slab Figures 5 and 6.
It is my recommendation that surface(brushed-on)applied crystalline waterproofing be applied
on PT deck surface and waterstop grout around the void/nm of all stubouts on the PT deck prior
to installing the topping slab. In addition,it is recommend that polypropylene fiber secondary
reinforcing be added in the topping slab mixture.
Pg.2
Port Angeles International Gateway Site Visit Report
Fi ure 1
Gateway
_East Garage
i East Wall , '"
Contractods.penciledy
de-lam line t•
Y
14�
k,� (:
Figure 2
R
Upper Target s
;r
Lower Target r .
1
Y
Pg.3
Port Angeles International Gateway Site Visit Report
Figure 3
Leak from hairline
crack in slab
rY a,
Pg.4
6 Brigkt Qngineering Inc. Consulting Structural a Civil Engineering
1809 711 Avenue,suite 1100 • Seattle,WA 98101 • (206)625-3m • Fax(206)625-0185 • into@bdghteng.wm
o f'417 e r'£! . oJECT No. s��<<
SUBJECT DATE 7 BY
3a
vD Q,
� Z
E o
A4
r
t 1
V
�If•'
T -
r�.
s ��r
a„
:r, � » �� •� ,i•.. sy.i rte~ �' �'� ;'1fi ',•<� ,.3,�ti'
ki`�14i�e:.ter• r q-,`.
2008) Sue Roberds Parking lane width--
From <mmadsen@priorityone-advisors com>
To <Sroberds@cityofpa.us>
Date 9/12/2008 10:25 AM
Subject: Parking lane width
Sue
This email is to confirm our phone conversation this morning
I did not and would not have approved a parking drive aisle with a width of
only 18'when the parking angle is 90 deg The minimum that I would have
even discussed would have been 20' and then only if the parking stall depth
was also 20' IE, 20-20-20 = 18-24-18
Hope all is well
Mark
Mark E. Madsen
PriorityOne Advisors
<mailto mmadsen@PriorityOne-Advisors com> mmadsen@PriorityOne-Advisors com
360 460 5885
r
�C/�/ ,:
���
���
.�
��
��
,�r(�� Ort'
U— e,✓
r
s
Page 1 of 3
,•,rM
(Attachments can contain viruses that may harm your computer Attachments may not display correctly
Ingo Goller
From: Roger Horton Sent: Mon 8/18/2008 9:34 AM
To: Santosh Kuruvilla;Abdul Chahim
Cc: Ingo Goller
Subject: RN• Gateway East Wall Delamination
Attachments: D Ss852579A.ipg(940KB) 0 SS852578.iPg(2MB) D SS852576.ipg(2MB) Ss852580A.ipg(866KB)
Please review and give thoughts on extent of delamination
Regards,
Roger E. Horton, P.E.
Deputy Director of Transportation
Exeltech Consulting, Inc.
2590 Willamette DR NE, Suite 101
Lacey WA 98516
rhorton@xltech.com
P 360.357 8289
C. 360 915 4147
F 360.357.8225
Sustainabe Engineering Solutions for a Changing World*People,Not Companies, Deliver Projects
Disclaimer-The attached files and/or text within this e-mail message are the property of Exeltech Consulting, Inc. Reuse
of the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting,Inc.shall not be held
responsible for any and all losses,claims or liabilities associated with the unauthorized use,interpretation or
modification of the files or text.
http.//maii.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2oRetai 9/8/2008
Page 2 of 3
1
J `
From: Ingo Goller
Sent: Sunday, August 17, 2008 4 21 PM
To: ab@brighteng.com; Stan Cruse [scruse@parametrix.comj, rkugen@parametrix.com,
jdugan@parametrix.com
Cc: Roger Horton,Tom Ellis; Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us], Lindsay Murray
Subject: Gateway - East Wall Delamination
Attached are four pictures that shows the more severe portion of the delamination under the bearing seat for
PB 3 The delaminated area has expanded about 150% since it was first identified after the stressing of the
beam. Please have Ade arrange a site visit as soon as possible to review this condition in person and provide
a recommended repair
A question to consider is 'What is the structural impact of the delamination that is up to 6 5' in depth and has
exposed three vertical bars and at least one horizontal bar?" A second question to consider 'What is the
structural service life impact?'
Minor delaminations have also occurred at the other beam bearing locations except for the north beam.
Ade still needs to provide the load limit calculations for the plaza deck.
Regards,
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street,Suite 120
Port Angeles,WA 98362
Ph:360.417.3803
http.//mail.xltech.com/exchange/igoiler/Inbox/Proj ec.ts/Gateway/Construction/NE%2ORetal 9/8/2008
Page 3 of 3
Fax:360.417.3097
The attached files and/or text within this e-mail message are the property of Exeltech Consulting Inc. Reuse of
the files for any other purpose without authorization is strictly prohibited. Exeltech Consulting Inc shall not be
held responsible for any and all losses claims or liabilities associated with the unauthorized use interpretation
or modification of the files or text.
http.//mail.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
Gateway
East Garage
East Wall y ;
Contractor's penciled }
de-lam line
e
a
�3
I
i
o�
' � � nidi;✓ .� ,t tl.
.t r 7 n �t•�r� 1f
' 6
x J
-A
9 t;�• 1
Gateway
# ' T
East Garage
3 x P. 3
} East Wan .
3(yTu�"
e_
08 / 15 / 2008
V,
�vx
ft
l4k 7 �1000
0 At
14-
vf 4, x W49L
ez
-Y
vf#
10
JW
)T,WK
As
1A
y2f
PREPARED 7/30/08 14 20 39 INSPECTION TICKET PAGE 2
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 7/30/08
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PHONE
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
provide access to remove hvac/roof access ladder sprinkler
is in the way of using ladder safely
BLI O1 6/13/08 JLL BLDG INSULATION
6/13/08 AP June 13 2008 8 57 31 AM 1pangrle
RANDY 461 1391
EXTERIOR INSULATION-
June 13 2008 4 19 05 PM jlierly
BL3 02 6/13/08 JLL BLDG FRAMING
6/13/08 AP June 16 2008 5 33 14 PM 1pangrle
FRAMING
June 16 2008 5 34 14 PM 1pangrle
BLCG O1 7/30/08 LL BLDG CEILING GRID
July 30 2008 8 45 35 AM 1pangrle
RANDY 461 1391
CEILING GRID
COMMENTS AND NOTES
°f`0
'4"� CITY OF PORT ANGELES
T FN
DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION
�v 321 EAST 5TH STREET PORT ANGELES, WA 98362
Application Number 06 00001042 Date 7/14/08
Application pin number 715806
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000
Tenant nbr name CLALLAM TRANSIT SYSTEM
Application type description COMM NEW CONST
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 2717673
Application desc
GateWay Transportation Center MAIN BLDG
Owner Contractor
Clallam Transit System O R� �r i rn0 ans-"oln 3: jc
830 W Lauridsen Blvd ,-„76
C
PORT ANGELES WA 98363 `c,,C,
(360) 452 1315 c/ �tllly�� �A q 3-Z
Other struct info TOTAL % LOT COVERAGE 28 50
NUMBER OF STORIES 2 00 -3(0) 683 �
LOT SIZE 79715 00
PROPOSED LOT COVERAGE 22791 00
TOTAL LOT COVERAGE 22791 00
NUMBER OF UNITS 1 00
?gyp �-�c
Permit PLUMBING PERMIT
Additional desc BACKFLOW PROTECTION \� �A
Permit pin number 130013 xl v
Permit Fee 17 00 Plan Check Fee 00 ,l (}� r`% JJJJ
Issue Date 7/14/08 Valuation 0
Expiration Date 1/10/09 .frame/
Qty Unit Charge Per Extension
BASE FEE 10 00
1 00 7 0000 ECH PL-OTHER BACKFLOW 2 OR LESS 7 00 4d
Special Notes and. Comments
This project will require a seperate permit and fire alarm
plans for review
Address numbers shall be plainly visible from the street
Address numbers shall be a minimum of six inches high and be
of contrasting color from the background
Owner is responsible for ongoing fire alarm system
inspection and maintenance per the current addition of NFPA
72
Owner is responsible for ongoing fire sprinkler system
inspection and testing per the current addition of NFPA 25
This project will require seperate permit and fire
sprinkler plans for review
Call for cover inspection for all sprinkler installations A
full acceptance test will be required for all fire alarm
systems
Separate Permits are required for electrical work,SEPA,Shoreline ESA,utilities,private and public improvements This permit becomes
null and void if work or construction authorized is not commenced within 180 days if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced or if required inspections have not been requested within 180 days from the
last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
© c
Date Print N e Sign atur of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T.Forms/Building Division/Building Permit(10/01/07).wpd
BUILDING PERMIT INSPECTION RECORD
CALL 417-4815 FOR BUILDING INSPECTIONS CALL 417-4735 FOR ELECTRICAL INSPECTIONS
CALL 417-4807 FOR PUBLIC WORKS UTILITIES
PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE
INSPECTED AND ACCEPTED POST PERMIT INA CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE.
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO
FOUNDATION-
FOOTINGS
SHEAR WALLS/WALLS
FOUNDATION DRAINAGE/DOWNSPOUTS
PIERS
POST HOLES(POLE BLDGS.)
PLUMBING
UNDERFLOOR/SLAB
ROUGH-IN
WATER LINE(METER TO BLDG)
GAS LINE FINAL DATE ACCEPTED BY.
BACK FLOW/WATER
AIR SEAL
WALLS
CEILING
FRAMING
JOISTS/ GIRDERS
SHEAR WALL/HOLD DOWNS
WALLS/ROOF/CEILING
DRYWALL(INTERIOR BRACED PANEL ONLY)
T-BAR
INSULATION
SLAB
WALL/FLOOR/CEILING
MECHANICAL
HEAT PUMP/FURNACE/DUCTS
GAS LINE
WOOD STOVE/PELLET/CHIMNEY FINAL DATE ACCEPTED BY.
COMMERCIAL HOOD/ DUCTS
MANUFACTURED HOMES
FOOTING/SLAB
BLOCKING&HOLD DOWNS
SKIRTING
PLANNING DEPT SEPARATE PERMIT N's SEPA.
PARKING/LIGHTING ESA.
LANDSCAPING SHORELINE.
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCYIUSE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
ELECTRICAL LIGHT DEPT 417-4735 ELECTRICAL
LIGHT DEPT
CONSTRUCTION R.W /PW/ CONSTRUCTION R.W
ENGINEERING 417-4807 PW/ENGINEERING
FIRE 417-4653 FIRE DEPT
.,PLANNING.DEPT 1417-4750 PLANNING DEPT
BUILDING 417-4815 BUILDING
T Forms/Building Division/Building Pernut(10/01/07),wpd
OF pORT,N,O CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION
v 321 EAST 5TH STREET PORT ANGELES, WA 98362
Page 2
Application Number 06 00001042 Date 7/14/08
Application pin number 715806
Special Notes and Comments
10/03/2006 03 42 PM KDUBUC
A KNOX locking keybox will be required for Fire Department
access Contact the Fire Department at 417 4653 for KNOX
locking keybox ordering and location information
10/03/2006 04 00 PM KDUBUC
10/03/2006 03 43 PM KDUBUC
A fire extinguisher will be required in the elevator
machinery room
10/03/2006 03 44 PM KDUBUC
Contact the Fire Department for recommended fire sprinkler
system FDC locations
10/03/2006 04 01 PM KDUBUC
Fire sprinkler riser rooms must be labeled on exterior
doors
Electrical load calculations and elctrical permits are
required
Sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch 24 hour advance
notice is required
Construct driveway and Sidewalks to City Standards
No concrete with exposed aggregate allowed in the City
road right of way An inspection by Public Works
Engineering is required prior to prouring concrete
Other Fees SEWER SYSTEM DELV CHARGE 6960 00
STATE SURCHARGE 4 50
PW WATER SYSTEM USE FEE 12600 00
Fee summary Charged Paid Credited Due
Permit Fee Total 17 00 17 00 00 00
Plan Check Total 00 00 00 00
Other Fee `Ictal 19564 50 19564 50 00 00
Grand Total 19581 50 19581 50 00 00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
M T.Forrms/Building Division/Building Permit(10/01/07).wpd
1 BUILDING PERMIT INSPECTION RECORD
s:
CALL 417-4815 FOR BUILDING INSPECTIONS CALL 417-4735 FOR ELECTRICAL INSPECTIONS
CALL 417-4807 FOR PUBLIC WORKS UTILITIES
PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WOR.KBEFO:ZE
INSPECTED AND ACCEPTED POST PERMIT INA CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE.
INSPECTION TYPE DA'L'E ACCEPTED COMMENTS
YES NO
FOUNDATION-
FOOTINGS
SHEAR WALLS/WALLS
FOUNDATION DRAINAGE/DOWNSPOUTS
PIERS
POST HOLES(POLE BLDGS.)
PLUMBING
UNDERFLOOR/SLAB
ROUGH-IN
WATER LINE(METER TO BLDG)
GAS LINE FINAL DATE ACCEPTED BY.
BACK FLOW/WATER
AIR SEAL
WALLS
CEILING
FRAMING
JOISTS/ GIRDERS
SHEAR WALL/HOLD DOWNS
WALLS/ROOF/CEILING
DRYWALL(INTERIOR BRACED PANEL ONLY)
T-BAR
INSULATION
SLAB
WALL/FLOOR/CEILING
MECHANICAL
HEAT PUMP/FURNACE/DUCTS
GAS LINE
WOOD STOVE/PELLET/CHIMNEY FINAL DATE ACCEPTED BY.
COMMERCIAL HOOD/ DUCTS
MANUFACTURED HOMES
FOOTING/SLAB
BLOCKING&HOLD DOWNS
SKIRTING
PLANNING DEPT SEPARATE PERMIT H's SEPA.
PARKING/LIGHTING ESA.
LANDSCAPING SHORELINE.
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
ELECTRICAL LIGHT DEPT 417-4735 ELECTRICAL
LIGHT DEPT
CONSTRUCTION R.W /PW/ CONSTRUCTION R.W
ENGINEERING 417-4807 PW/ENGINEERING
FIRE 417-4653 FIRE DEPT
PLANNING DEPT k 41. 4750 PLANNING DEPT
BUILDING 417-4815 1 1 1 1 BUILDING
T Forms/Building Division/Building Permit(10/01/07).wpd
0,pOuT,14. BUILDING PERMIT APPLICATION Print in ink
"r CITY OF PORT ANGELES
For City Use Onl
Attn Building Permit Technician Date Received -09
�! 321 E. Fifth St. Port Angeles WA 98362 Permit#
(360) 417-4815 fax (360)417-4711
\ `� Date Approved
Applicant or Agent � Phone r
Property Owner 494 Phone
Property Owner's Address T-C �-
Contractor/Engineer �a,��Q,�P�. („� Co��r;w„� otic Phone
Contractor/Engineer's Address qF,3-z-) _C-e5 _ putn
License # flrJ0 Sic 63 Q Z Expires --5/c
PROJECT ADDRESS
Parcel Number Lot Zoning
Project Type & Brief Description. ❑ Residential ❑ Commercial 3/fj❑ Multi-family ❑ Industrial
Check all that apply lt, ci
❑ New Construction GcJu � �lrt �J IP/C(y,\ktq
❑ AdditionI In c -,
❑ Remodel d 14 c 1 s f L,e,p
❑ Repair
❑ Re-roof
❑ Demolition
❑ Heat System ❑ Heat pump ❑ wood-burning stove ❑ gas fireplace ❑ pellet stove ❑ other
❑ Other
Floor Areas Existing(sq. ft.) Proposed(sq. ft.)
Basement @ $ per sq ft. _ $
1 st Floor
2nd Floor
3`d Floor
Garage
Carport
Covered Porch
Deck
Shed
Other
TOTAL VALUATION $
Total footprint of structures sq ft. T Lot size sq ft. = Lot coverage %
Max. height of proposed structures ft. Occupancy group #of bedrooms
Will a lawn sprinkler system be installed? Occupant load #of full baths
Will a fire sprinkler system be installed? Construction type #of half baths
/have read and completed this application and know it to be true and correct. /am authorized to apply for this permit and
understand that it is my responsibility to determine what permits are required, and to obtain permits prior to working on
projects. c� r
Date v Print Name c-219%-t Signature
T Forms Bu ld ng Divis, n/Bldg Permit Appl. 2006 ode coc
71
'Pa .3. 'n���T-,„u:y'�,'.`ew = u ',5'�its'• ' '• �,.. .�. ?w�SY„' �y i,21
.21
,rte $',#� �+:% C _ ,,"^ :�' .';<, •��a,�' 'day '
I k
.$28 "dY•F.i.. �}
r4 � ;fir. ��•'s-`
222� •' ' i.• � aA• .31 w v . YP�
17��� ' roar �� � �`., •,' v •
14'r r ro`• a 1
mom°
123
' .?rt'• r 'v B ,"�,,.` � R.F.�.°' .�' •`y,„iy"fa1•�v •, J.a-}� i y f" t� ".4
- 126
201.
124
is
Oda. .4-
-Prigkt -Lncgineering inc Consulting 5ircicturc l ond'Ovil Engineering
Memo
Dofe. July 11 2008 PAID--1 16 03R
AI
To. Stan Cruse,Pararnetrix, Inc.
2102 N'Pearl Street,Suite301-
'Tacoma;WA:98406
From: Ade J'Bnght
RE: Port Angeles,Iintermational.Gateway
Brick Overhaing BeIoW,Parapet
As,requested, this is.to confirm that staggered buck overhang above window'head.wag.considefe :in
thedesign and reflected in the calculations with regatds to seismic. �--
N
Brink anchors are'placed at l 6'x 1`6''grids#o coincide with stud spacing;and the overhangs longer,
Anchors were specified and corifinned to be installed.by.the contractor Please refer,to sections Cl and
C2/A6.03'and,A/S2.08
Please call!,rf'yI u have any questions.
1.
5S�i
V-
cc' 'Signed, Acle J Bright,PE, SE
7/8/2008)James L_ierly SW Plaza Stair pdf _ Page 1
f
4
I
Iw
it 9 t L C
O Ks
s xxarrxtei rH 4ur ennm6. iga
.aQt3'i 1+raa �75;a[ P't55a_ F85td'/uAm
'.6582' !
...�� i P53T nti4,a' :5' t Ald
PM- F%vA 117 C•6583,'. -R. AN -
li 3`5• -3 'fat3v _ t•03 a k:l7t a _1.I atYn.$£;M,-4tt 5F' k'.�5.
� � �..f,Rtm ... �4rA' .. 9'.9y1s .._tOit._ �a' Psi t:�t'A�LH._��,S•77,13G,. ?} _��.
�5
'p;:5o 1"). PYSS _ SS,CEslt4, 'P-,9f!Y , 9... A16- .
I ' ..
29.1 G445}
AS
k
751A
.4
'A
_ �� �T baa..�
`y eta 2 s
B. 6
f 54
_Ptu3C>Au7. .. 4 � er, i Ptd I ,,. P25S p M Z t
td
h
-
`
7FiA
MA i2-41WAA
N.
Wil�*y� Ft9Y +, w,M q,,''"ti.�, `:; `,•.� � `�� i pt87�� � .was � 11�`--�\
CITY OF.PORT ANGELES—Con0mcNion.Plans � a�� � ,, ✓ DETAIL
The Issuance of this.permit based upon these.plans,spedfl-
cations and other data iFmll not preven e building official
i �4• yi_
from,thereafter.requiring the correctionof errors in said
plats, specifications and other data, or from preventing
building operations being carried on thereunder when in • ;,
violation of all codes and ordinances of this jurisdiction. ''"
(g€&FJ8N383 NI
1loil •ng l`nrlra l , 3 `' 7
Approval Date
NP198 5.51 .Wt • '�GRr 1Can,
_ _ __ - - _ PR87Y RL�AA6 - «`•wif Puai a .
_ ._ _ - .. �P �. 21$ � P`'�(�'/ �. Mn � idq.lutt NM �_ �,aa.etw�we :• ,.
PR MO CONSTRUCTION
1 RAILING 4h4ad .711A � "' tf 7 4UTM.Y7rtnY6Ftuffn*c&m
GRIM SV=TM AU WE=.WJRft,
PFE6 L9RA11T iDt�:a'" °" - - .. . 6,.5e+ARV$Llt3G8. :' ,..
errs..?i.-vnra'.sxr .v arrr�-.
T42e'�'1� m74.ttr A�
�� �CV11-1
13:-21516-
2'-81316 1012
2'-1015 t6 3'-47is
276 T-3116 L
38CD'o N
�j 1a 735. f8 '65$. �fi
s�
CD
Cl)
� j f•;p
0$9
f 3'-2316
•�w 2'-0316 f `�: . �
31
g 616 .fi1fi
c
ey 1t 1{ 'yt
.8
311 f �\
�f
I•
! -P ORT NGELES
A,
`® W A S H 1 N G T 0 N, U S A
s
MEMO
COMMUNITY DATE June 30, 2008
ECONOMIC TO Nathan West
DEVELOPMENT
Marls Madsen FROM Scott K. Johns, AIC
City Manager
417-4501 Gateway signage
Sue Roberds After reviewing the plans for signage at the Gateway Transportation Center at
Planning Manager Front and Lincoln Streets, I have the following comments
417-4750 1 Proposed freestanding signs. The plan calls for 2 free standing signs of
Nathan West 10 square feet each. Section 14.36 070A(4) PAMC indicates that in the
Deputy Directorr CBD, buildings may have one freestanding sign in addition to the
417-4751 signs allowed on the building. This is regardless of the number of
buildings on the site or number of businesses operating from the site
Scott Johns The freestanding sign located at the corner of Front and Lincoln would
Associate Planner be the more sensible location for a single freestanding sign.
417-4752 No structural information or color rendering was provided for the
Jim Lierly freestanding signs.
Building Inspector "Harbor Plaza and Gateway Transit Center" may not be the final choice
417-4816 for the name of the project.
2 Proposed wall mounted signs. Two wall mounted signs are proposed,
Linda Pangrle one facing Front Street mounted parallel to the south side of the
Permit Technician structure, the other facing west,parallel to the west face of the building.
417-4815 Both signs are 16 feet long by 1 foot, 8 inches high or a total of 26 6
Patrick Bartholick square feet. Both signs are well below the maximum allowed 20% of
Compliance Officer the building fagade area. The pavilion area has not been calculated into
417-4712 these figures
Even though the signs meet the allowed sign area, it appears that the
Fax. 360-417-4711 signs may cover the decorative brick patterns in the wall construction.
3 Directional/informative signage
a. Sign#4, restroom directional sign to be placed on the north side
of the building may be confusing and cause pedestrians
additional steps to locate the restroom entries. This sign's
location or design should be rethought.
b Sign#17, No Trailer/RV's located at the north and south ends
of the parking ramp structure are proposed to be white lettering
on a brown background. These may be more readable if they
F;
.. ', ..
Mrte— F
,S w. _ - .�•ro.ar s :{.`s-�1d.�•�.j;""s'.Px:.Lb;�'s 'S ;t �jy,; ~'� -zf�
it
'S'
~ were black lettering on a yellow bacxground, similar to other
traffic warnings signs
c Signs#18, Low�Clearance 7' 6" located at1he north entry to the
parking ramp and at the entry to the parking area below the
plaza is also proposed to be white lettering on a brown
background. These may also be more readable if they were
black lettering on a yellow background. For both #1.7 and#18,
a high color contrast on a reflective surface is recommended.
The-informational signage proposed appears to be consistent with color standards for similar
signage, i.e , green lettering on a white background for general parking information, blue
lettering on white background for restrooms and accessible parking areas, and white lettering on
brown background for recreational information (bicycle storage areas)
The signs proposed do not include several messages that are important to adequately inform the
public Additional public information signs should include messages about skateboarding,
bicycling, and rollerblading in the downtown area per the Port Angeles Municipal Code. These
signs need to be located in several locations. Also lacking is signage that differentiates between
long-term, short-term, and permit parking and directions to the locations of such parking.
A design template for tenant's signs must also be included. An informational kiosk concept for
the site has been discussed. This will unify the signage for leased parking, public parking, and
public uses areas for the entire site. Consistent sign design for the entire project will provide a
quality look and provide flexibility for future changes of use or occupancy and will eliminate the
need to revisit the sign issue if changes in use do occur
Color renditions of all proposed signage must be submitted for review This is especially
important for the commercial signage to allow staff to evaluate the appearance of the entire sign
package.
TRANSMITTAL MEMO
e x e I t e c h
Date: June 26 2008 Re. W G —Stairway& Railing Dwgs.
To- Jim Mahlum Engineering Job#• 0635
City of Port Angeles
325 E 4th St. Gateway Transportation Center
Port Angeles WA 98362 City of Port Angeles
The following is transmitted
❑ As requested X For approval X For review/comment
❑ For your use ❑ For correction and,resubmittal ❑
Copies Date No. Description
1 5/22/08 ProDraft, Inc. Dwgs. E7 703A—712A, &W167 W216
Remarks:
Submitted for Jim Lierly review O�
t�
n�
Signed:
----- � d
Ino Gofler, PE J�v1 r
cc: File
Lacey Office Port Angeles Office Seattle Office
2590 Willamette Dr NE,Suite 101 116.W 8th Street,Suite--120 615 2nd Avenue,Suite 660
Lacey WA 98516-1325 Port Angeles,WA 98362 Seattle,WA 98104-2228
(360)357-8289 (360)417-3803 (206)623-9646
(360)357-8225 Fax (360)417-3097 Fax (206)623-9658 Fax
-r-
;` _ s..
CONSTRUCTION, INC
Port Angeles International Gateway Center
SUBMITTAL FORM SUBMITTAL NO- Div 05
DATE 06/03/2008 SECTIONS 05120
PCI# 702203 P196,-P201,P203-206,P208-215,
W702.A, W710.A-712.A,P207 &P216
ENGINEER. Poggeme er Desi Group, Inc
ADDRESS 512-6"' St. So Ste 202,Kirkland, WA 98033
PHONE. 425 827 5995
GC Pnmo Construction,Inc
CONTACT Patsy Busby
ADDRESS 970 Carlsborg Rd., Se uim, WA 98382
PHONE 360 683 5447 X 234
SUPPLIER.
CONTACT
ADDRESS
PHONE
SUBMITTAL CONTENTS
SHOP DRAWINGS
PRODUCT DATA/SPECS
INSTALLATION DATA
X CALCS /TEST DATA
MANUFACTURER S RECOMMENDATIONS
MANUFACTURER'S WARRANTY
OPERATING INSTRUCTIONS
INSTALLER CERTIFICATIONS
MATERIAL CERTIFICATIONS
SAMPLES
COLOR SELECTION REVIEWED COMMENTS
OTHER. ANY CHANGES MADE BY
Contractor's Comments. SUBMITTALS,ECT ARE SUBJECT
TO AR¢211 �REVIEW.
BY: tt
DATE:
B Pats BusbyPRIMO CONSTRUCTION,INC.
970 Carlsborg Road,Sequim,WA 98382 360.683.5447 X 234 360.683.6475 fax pb@olympus.net
pr1�
j-/mnr 0 V
CONSTRUCTION, INC
Port Angeles International Gateway Center
SUBMITTAL FORM SUBMITTAL NO- Div 05
DATE 05/28/2008 SECTIONS 05123-01
PCI# 702203 W Parking Garage N Stair
ENGINEER. Pog eme er Design Group, Inc
ADDRESS 512-6h St. So Ste. 202,Kirkland, WA 98033
PHONE 425 827 5995
GC Primo Construction, Inc
CONTACT Patsy Busby
ADDRESS 970 Carlsborg Rd., Se uim, WA 98382
PHONE 360 683 5447 X 234
SUBMITTAL CONTENTS &
X I SHOP DRAWINGS �3
PRODUCT DATA/SPECS
INSTALLATION DATA
CALCS /TEST DATA
MANUFACTURER'S RECOMMENDATIONS
MANUFACTURER S WARRANTY
OPERATING INSTRUCTIONS
INSTALLER CERTIFICATIONS
MATERIAL CERTIFICATIONS
SAMPLES
COLOR SELECTION
OTHER.
Contractor's Comments.
By Patsy Busby
970 Carlsborg Road,Sequim,WA 98382 360.683.5447 X 234 360.683.6475 fax pb@olympus.net
FB 14X2 x 612
114 L 4 114
2- 160
r 00 p196
N
a0
r-
❑REVIEWED
❑REVIEWED AS MODIFIED
Lj/REVISE AND RESUBMIT
NOT REVIEWED ENTIRE 51A01TTAL
Reviewed only as to general conformity with the
design concept.The Engineer does not warrant
or represent that the im Irmation contained on
tti;;arawing is either acc,irate or complete.
!� -sponsibility for correct design,details and
a;uns shalt remain,with the party
si ,t Ig tl,e drawing.
�yE n. Si"N GROUP INC.
U
Date. O o
No In assembly
1 711A
1 712A
P196 FBI/4X2 A36 2 0'-61/2' 30.23 0.9
MARK L SIZE I GRADE I No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 6047 1 8
PRO DRAFT INC DRAWING NUMBER: W [P 196]
#205-12332 Pattull0 Pl. CONTRACT NO- PROJ # PLOT DATE 06/03/2008
PH-804,58H42h FAX:W Sag 7747 Surrey B.C. V3V8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
I Website: mpmdraffingcom C)1'4 0
FB14X2 x 8
114 512 114
2- 160
I'loo p197
N
00
r
No In assembly
3 711A
3 712A
p197 FBI/4X2 A36 6 0'-v 36.94 11
MARK LSIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 221 65 6 8
PRO DRAFT INC DRAWING NUMBER. W [p 197]
#205-12332 Pattull0 PI. CONTRACT NO- PROJ # PLOT DATE 06/03/2008
Surrey B.C.WV K3 REVISION TEXT FOR APPROVAL PH-604 589 642S FAYAn4.QA 7747ISSUE DATE. 00100/0000
Websk ymprodraftapm 1,40-
F1314X2 x 10
P198
N
No in assembly
2 702A
P198 F81/4X2 A36 2 0- 10' 45.98 14
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 9197 28
PRO DRAFT INC DRAWING NUMBER. W [p 1981
#205-12332 Pattull0 PI. CONTRACT NO- PROD # PLOT DATE 06/03/2008
Surrey B.C.V3V 8C3 REVISION TEXT FORAPPROVAL ISSUE DATE 00/00/0000
Webs47
ite: ww.
worodraf inc.can o'
FB14X2 x 43
F/pl99
N
-----------
No In assembly
2 702A
P199 FBI/4X2 A36 2 0'-4 3/4' 22.46 0.7
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 4493 14
PRO DRAFT INC DRAWING NUMBER. W [p 199]
#205-12332 P2ttuli0 PI. CONTRACT NO- PROJ # PLOT DATE 06/03/2008
Surrey B.C.V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
PH-MO-6425 FAXAWRY774�--Wel b:—www.nrodraMncc�a---- o
F1314X2 x 212
p200
N
No In assembly
2 702A
p200 FBI/4X2 A36 2 0'-21/2' 12.23 0.4
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 24 47 07
PRO DRAFT INC. DRAWING NUMBER: W [p 200]
#205-12332 Pettull0 Pl. CONTRACT NO" PROJ # PLOT DATE 06/03/2008
Surrey B.C.V3V 8C3 RE25 Y.sn4.QQ 7747VISION TEXT FOR APPROVAL ISSUE DATE 00/00!0000
0REVISON
FBl4X2 x 658
p201
N
No In assembly
2 702A
p201 FB1/4X2 A36 2 0'-6 5/8' 30.90 0.9
MARK SIZE I GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 61 80 19
PRO DRAFT INC DRAWING NUMBER: W [p 201 ]
#205-12332 Pattullo PI. CONTRACT NO• PROD # PLOT DATE. 06/03/2008
Surrey B.0 V3V 8C3FAY-BMW 7747 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
Wehsfte: wnuw.nrodraftinc com o'
FB38X3 12 x 612
114 1, 4 714
2- 160
p203
N r
r
M sl
M
r
No In assembly
Z 711A
2 712A
p203 F63/8X31/2 A36 4 W-61/2" 1 52.97 2.4
MARK I GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 21188 1 97
PRO DRAFT INC DRAWING NUMBER: W [p 203]
#205-12332 Pattullo Pl. CONTRACT NO- PROJ # PLOT DATE_ 06/03/2008
PHJUM464A FAX,_Rn4 SH 7747 Surrey B.C.V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE. 00/00/0000
0
5'-7
p204 A
A
N
134
78
p204
co c
L r M�
t0 (o
co
c+')
1316
A - A
No In assembly
1 702A
p204 PL3/16X7 A36 1 5'7' 992.88 25.7
MARK SIZE GRADEI No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 99288 257
PRO DRAFT INC DRAWING NUMBER: W [p 204]
#205-12332 Pattullo PI. CONTRACT NO- PROJ # PLOT DATE 06/03/2008
PH-604 589 6425 FAX-fiU 589 7747Surrey B.C.V3V8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
0
5'-7 (PL316X21 58 x 5'-7")
p205 B
fA A
B
4 4
M M
M
V7 Lo
0
NOD
p205 A - A co
316 10 1116
34
cfl
p205 ,00
A co 00
� M
238 5 334
11116 134
(n'p)
1158 N
B - B
No In assembly
1 702A
p205 PL3/16X_ 21 34" A36 1 5'7' 2934.83 771
MARK SIZE GRADE I No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 293483 771
PRO DRAFT INC DRAWING NUMBER: W [p 2051
#205-12332 Pattullo PI. CONTRACT NO- "
O PROJ # PLOT DATE 06/03/2008
Surrey B.C.V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
0
5'-7 (PL316X21 58 x 5'-7")
/,211
A
A
316 10 1116
34
"o
co
p+6 -D co co
�
11116
1158 134 (NP)
A - A
No In assembly
15 702A
p206 PL3/16X_ 21 34' A36 15 5,-7' 3012.15 79.2
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 45182.24 11878
PRO DRAFT INC DRAWING NUMBER: W [p 2061
#205-12332 Pattull0 Pl. CONTRACT NO- PROJ # PLOT DATE. 06/03/2008
Surrey B.C.V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE. 00/00/0000
Website: w,!.mdrafincmm o•
PIPE_1-14"0 SCH 40 x 4'-0
1316 1316
p208
R1316 - - - - - - - - - - - - - - - - -- - - -
— — R 1316
No In assembly
12 71 OA
p208 PIPE_1-1/4'0_SCH._40 A53 12 4-0" 24446 9.1
MARK SIZE GRADE No. I LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 2933.48 109.3
PRO DRAFT INC, DRAWING NUMBER. W [p 208]
#205•-12332 Pattullo Pi. CONTRACT NO- PROJ # PLOT DATE 06/03/2008
Surrey B.C.V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE. 00/OO/0000
Websfte mumdraftinc.can o' F-CETTSTYMOM=- 1 037301,7757-'
PIPE 1-14"Q1_BCH. 40 x 5'-4
1316 1316
p209
R 1316 7 - -
- - - - - - - - - - - - - - - - -- - - - - - - - 81316
No In assembly
7 71 OA
p209 P1PE_1 1/4'PJ_SCH._40 A53 7 5'-4 327.61 12.1
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 2293.30 85
PRO DRAFT INC DRAWING NUMBER: W [p 209]
#205-12332 Paltullo Pl. CONTRACT NO• PROJ #
Surrey PLOT DATE. 06/03/2008
PH'6945896425 FAX-fiD4 589 7747
B.C.V3V$C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
No,'
813p210
16 - - - - - - - - - - - - - -
- - - -
- - - - - - - - - - - - - - - - - - -
1316
PIPE_1-14"Q3_SCH. 40 x V-5316
No In assembly
4 71 OA
p210 PIPE_1 1/4"0_SCH_40 A53 4 1-5 3/16° 87.28 3.3
MARK SIZE GRADE I No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 349 12 13.1
PRO DRAFT INC, DRAWING NUMBER: W [p 210]
#205-12332 Pattullo Pi. CONTRACT NO- PROD # PLOT DATE. 06/03/2008
PH,604 589 6425 FAX-Q 589 7747Surrey B.C.V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE. 00/00/0000
o.
r
PIPE_1-14"0 SCH 40 x V-5316
1316
p211
No In assembly
1
710A
p211 PIPE_1-1/4'Yd_SCH._40 A53 1 3'-5 3/16" 211.80 7.8
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 21180 78
PRO DRAFT INC. DRAWING NUMBER: W [p 21 1 ]
#205-12332 Pattullo Pl. CONTRACT NO- PROD # PLOT DATE 06/03/2008
Surrey'V589 fd25 AX,AnA AN 7717 B.C.V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
1316
p212
8 1316 — — — — — — — — — — — — — — — — — — — — — — — — — — — —
- - - - - - - - - - - - - - - - - - - - - - - - - - - -�
I I
I I
co I I
I I I
� I I
co
4
r-
cfl
M
2'-214
2' 1014' (ABT)-7No In assembly
3 71 OA
p212 PIPE_1 1/4"0 SCH._40 A53 3 2'-9 1/2" 168.99 6.4
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 50696 191
PRO DRAFT INC DRAWING NUMBER. W [p 212]
#205-12332 Pattullo Pl. CONTRACT NO- PROJ # PLOT DATE 06/03/2008
Surrey B.C.V3V 8C3 wsw REVISION TEXT FOR APPROVAL ISSUE DATE. 00/0010000
WnhcOn rcnAraAinc mm O
PIPE_1-14"P_SCH 40x5'-778
5r16l-P
138
P213
�P - - - - - - - - - - - - - - - - - -
- - -
71316
6138 N 516
T
A
1116
R - -�p213
78
A - A
No In assembly
15 711A
15 712A
p213 PIPE_1 1/4'0-SCH_40 A53 30 5-77/8' 348.03 12.9
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1044103 3865
PRO DRAFT INC DRAWING NUMBER: W [p 213]
#205-12332 Pattullo Pl. CONTRACT NO• PROJ # PLOT DATE 06/03/2008
Surrey B.C.V3V 8C3 REVISION TEXT FOR APPROVALFAY-AnA;RQ 7717ISSUE DATE. 00/00/0000
Wefsite wm4,nmdraftinc.cam Io'
PIPE_1-14V_SCH 40 x T-21116
138 CN
71316 p214
-
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
516 1116
1116
p214
R18 7 — — — — - -
A - A
No In assembly
2 711A
2 712A
P214 PIPE_1-1/4"Od-SCH_40 A53 1 4 3'2 11/16' 19641 7.3
MARK SIZE GRADE No, LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 78564 29.4
PRO DRAFT INC, DRAWING NUMBER; W [p 214]
#205-12332 Pattullo Pi. CONTRACT No- PROD # PLOT DATE. 06/03/2008
Surrey B.0 V3V 8C3 REVISION TEXT FOR APPROVAL5897747 ISSUE DATE 00/00/0000
Wersile wuw.omArnflinc crvn o'
p215
N
2516
No In assembly
4 711A
4 712A
p215 ROD1/4 A36 8 0'-4 3/16' 3.36 0.1
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 2691 O 5
PRO DRAFT INC DRAWING NUMBER: W [p 215]
#205-12332 PattUllo PI. CONTRACT NO- PROD # PLOT DATE 06/03/2008
Surrey B.0 FAX-604.0 7747V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
draftinc wm o
MC12X10.6 x 17'-9716
IT-31516 5916
358N
co ?78 6S8
/7131C 12 42
v co
Lo
oo
co
N N
ti
ro
1. u
co
O
12
co
9151671316
n
N 51116 31316 138
1078
No In assambl
1 702A
702A MC12x10.6 A36 1 1 1T-97116° 1 6008.80 187.6
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 6008.80 187.6
PRO DRAFT INC. DRAWING NUMBER: W [702.14]
#205-12332 Pat41110 PI. CONTRACT NO: PROD:# 1 PLOT DATE. 06/03/2008
Surrey,B.C.V3V 8C3
PHIffidag REVISION TEXT. FORAPPROVAL I ISSUE DATE: 00/00/0000
i
6'-0
I
I
I
I
� I
04
ap I
I
I
I
_ — — _ ___ _ _ _ _ _
I I
I I
I I
I I co
o
I I
I I
I i
I
I
I
1
I
4
I (V
I
6'-0
No I In assembly
29'-034-(ABS I 1 71 OA
710A PIPE_1-1/N'0_SCH-40 A53 1 1799.9065.7
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 1799.90 65.7
PRO DRAFT INC. DRAWING NUMBER: W [71 O A]
#205-12332 PattUlD PL CONTRACT NO PROJ:* PLOT DATE. 06/03/2008
SURBY,B.C.V3V 8C3 REVISION TEXT. FOR APPROVAL ISSUE DATE: 00!00/0000
14'-358
I `
I �
m I \
r
I
� I
I �
M
I 7>,
12 .OSB
CV
co `
I
I
I �
N
M I <M
� I
12
ro
23'-9(ABT) No In assembly
1 711A
711A PIPF--1-1/4"0_SCH._40 A531 1458.15 53.3
MARK SIZE GRADE No, LEN OTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1458.15 53.3
PRO DRAFT INC. DRAWING NUMBER: W [71 1.A]
4205-12332 Path1B0 PL CONTRACT NO: PROJ:# PLOT DATE: 06/03Y2008
Surrey,B.C.V3V 8C3 REVISION TEXT, FORAPPROVAL ISSUE DATE. 00/00/0000
16'-878
111518 L 14'10 L 101516
� I �
i �
I
U30
12
� h
N
UP
� I
M
iV I p207
No In assembly
25' 1 (ABT) 1 711 A
P1 712A
p207 PIPF-1-114%0 SCH-40 A53 2 1 1555 56.8
MARK SIZE GRADE No. I LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 3110 113.5
PRO DRAFT INC. DRAWWG NUMBER: W [p 207]
#205-12332 Pattullo PL CONTRACT NO: PROJ:# PLOT DATE. 06/03/2008
`_ SlRfay,B.C.V3V 8C3 REVISION TEXT. FORAPPROVAL ISSUE DATE: 00/001D000
14'-358
m I \
\ 12
\ e
\ CY)
\ (V
co \
r \
f�
co (V
c; I M
1�-
12
23'-9(ABT) No In assembly
1 1 712A
712A PIPE-1-1W0-SCR-40 A53 1 1458.15 53.3
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1 1458.15 1 53.3
PRO DRAFT INC. DRAWING NUMBER: W [712 A]
#205-12332 Pattu@o PL CONTRACT NO: PROJ:# ELOT
DATE: 06/03/2008
Burley,B.C.V3V 8C3 REVISION TEXT. FOR APPROVAL ISSUE DATE. 00/00/0000
MC12X10.6 x 17'-9716
91516 16-01116 51116 31316 1, 138
� N
1271316
c
co
co
y
to
N N
of
Lc) � co
io rn
co
71316 p216 Z�2 ��00 g358
N 12
5916
No I In assembly
1 1 702A
p216MC12X70.6 A36 1 iT-97116' 6088.87 187.6
MARK SIZE GRADE No. LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL1 6008.87 1 187.6
PRO DRAFT INC DRAWING NUMBER: W [p 216]
#205-12332 Pettu110 PI. CONTRACT NO: PROD:# PLOT DATE. 06/03/2008
Surrey,B.C.V3V 8C3 REVISION TEXT. FOR APPROVAL ISSUE DATE: 00/00/0000
PRO DRAFT INC
49_1
a'MWtl0nPa9H;Jnv nq
Y,OMM9m9' «t JORl-YlGELE9_GAIEWA 319
hm ma'oa99rzwe 9r:erm
0.5 C�D © C,2
2121 5'-7 212 I 1 T-5 18'-0 r -
N459 5'-21119 2 2
�► I I
,12 „1 54
8'RSTAININO WALL 708A I a 12 _ 712A
CLOSURE ANGLE v r RAIDING RAILING _ W v
_ ________
EMBED
_ _ O
RA ING eT° + ° } _�� ` �y N {Q° 34'0 EXPANSION BOLT 34"PJ EXPANSION BOLT
711A 7.1 .� •— 1L7 — — — — — — — — 'Eil
RAILING —__— _ 7
co
is
--� — — DETAIL 1
709A 70SA
709A EMBED 6 CLOSUR OLE
EMBED
I' I 2 '
212
S
mco
709A
R EMBEDFF
N _a
34"0 EXPANSION BOLT
E09� k d '�` DETAIL 2
_ 2 2i2
6 8'-2 I 2'-334 13'-107e
(TO ANGLE HLS) I I
4,118 5'.2117e "' •
709A Fl Ci.2
A A e14
© m_
FO L" - 3 710A 3
RAILING � EMBEDMENT 4
TO EDGE OP S•SLAS ly (MIN) I 2 2
(EL.or•o•roes �4 5'-4 I
C.2 ©
O 0.5 ,S
4 4 CLOSURE ANGLE
6'-416'0 V4 4 TOP STAIR
614 3'-934 1. 4'-0 4'-0 4'-0 1, 7-214 PAN
- 4
c
5-0 8 4' S'-4 8 I c
(OPEN TO BELOW) IA
214 RAILING
RAIDING I I I I . I RAILING 8"RETAINING WALL
34°0 EXPANSION BOLT
R �D b
EMSE R
I _ 3
78 2 8
CLOSURE-ANGLE EMBED 709A 709A 709A (\QI
EMBED EMBED EMBED
— — — — — — —
709A �709A DETAIL 3
(SIM/OPP) EMBED 6 EMBED EMBED 1
I. 61-0 18;,
702A
BTAIR•1 I 1 TAI L ,j
}} 2
I
O .I, I ..`
PLAN Q STAIR-1 (WEST PARKING GARAGE) I y -------------
------------
-- ---_----
I -- --------
J -ti_ lig CONTRACTOR NOTE:
212 2 2 702A — PRINT RECORD y1p" A 93VLWW FORAPPROVAL a
(OPP) (OPP) STAIR-1 0. Um are 10 DA RIFTI
_ m
13'-107e 7.334 ,'-97,e I c c n PRIMO CONSTRUCTION
Bp I—H ""a 970 CaAeborg Road Sequlm,Wa.98382
D Pho (380)243.8229 Fax:(360)504.1183
Fos omm 'p1q"°a °T GATEWAY TRANSPORTATION CENTER
0A —j RAN@EL 7!O(FAIXI NEST PAWHGGAAl0
OST PRIMO CON9TRUCi9°N P,C
a�ECT. ' mrs9rm°e aM— 1 702203 -E'$~ n
PRO DRAFT INC!'01e 'Px 4ea4us
°RNeYI°3 PIEFAM.A Pipes "
N xv Tae_ 3p0RT.1NGELF3_GATEWAr_09
Plot oqc a6-df2pGe 16'.Ia:1a
0.5 GJD O
20'-10 4 -EMBEDMENT
Ep--�� 7-314 3.91118 3.91116 3'_91118 2'-134 18 (MIN)
—1— — 178
` 709A 1"51t+6
�r
EMBED 704A 706A I I CL7D1P hJGL. O FPANSION
707-8 aAluwG RgILING707-8 RAILING RAILNG � BOLT
Lt o o M
I
EMBED
I i
o EMBED 709A 709A 709A
I I CLIA ANGLE EMBED EMBED EMBED b
N » 70RA i 6-0 i 5 aro�NGLE a EMBEDMENT
EMBED I 6'-112 112
(MIN)
D E IEWED '°'">
ss4
FIELD�334 r-a 2 5'-612�A RE IEWED AS MODIFIED M
V-334 a
I
Bl REVISE AND RESUBMIT Se
709A r-224 a'-0 s+ 709-8 UNOT REVIEWED
EMBED I3 3EMBED
709A Reviewed only as to general conformity with the 24"0 EXPANSION BOLT
16
EMBED design concept.The Engineer does not warrant
_ E E
m ' I o or represent that the information contained on I
EMB W Mf F N Iete
I
�C R„�G C 709A W Scle-esponsibi!ity for correct design,details and
Q EMBED .- a ,
7�rt 7oSA d;n ns;Drs shall remain with the party
aw ANGLE RAILING subrnitling the drawing. W 2 2
704-8 1 70
3A z 2 212 FOGGEMEY R DESIGN GROUP INC.
RAILING 1 (`SHIM) 9TNR•2
I D `I I m + N 7•334 14'-212 6y'— i l�S I
E D m q
�' - - - — — A A Date 6 0Lk 2V,
24"0 EXPANSION BOLT 24V EXPANSION BOLT
LRE „F� ode DETAIL 1
COMMENTS 7-024 4'-1 714 1224 4'-0 714
”) -ES MADE BY
Ti:EE .y.. +-61116 Sole 312 12 706A 3 63) SPLICE 12
11 O` DRAWINGS I RAILING 707A DI212
mALS,ECT ARE SUBJRAILINGI RARNG
1. �7G
CHITECTS REVIEW ; ! m g
TYP Y =,�. w o .M CONSTRUCTIOM INC tyi l
709A 709A EMBED
r- J 708A EMBED 709-8 E0BE 9M�BE EMBEo EMBED 24°0 EXPANSION BOLT
F_J CLIP ANGLE 6 5-0 DETAIL 2
--- -- 1_ 7 703A
F-� C C
(._j i'-412 5-612
5 5'-2 F-� o
(TO ANGLE HLS) F_J ti
41116 5'•21116 B F_J '^ls�
le
CONTRACTOR NOTE: AL
2 2 212 ATN'9nEEQARWD.WFVY WpPPILr AUFORGuwr�&
KL 01 ENSIONSALLNFORWTI N,IALL
ELM��IISTAIR-2.- F
(W �T PARKING GARAG� 2,-334 14'_212 PRINT RECORD
A Yyme PGR APPROVAL 0.1
0. WE I MT REVI DATE I DESCRIPTION
B s n PRIMO CONSTRUCTION
APPiL
RlRCN A1;PALd° 970 Carisbo g Road 9equlm,Wa 98382
FAB Pho (360)243-8229 Fax(360)504-1153
FA5.01TICE0P''"•"D L1 GATEWAY TRANSPORTATION CENTER
oa op awsa"ora RANQEL 27'•10'70.2 WESTPNWNGGPRAGE
GIST. PPoNO CONSTRUCTION I
o Lu "
ERECT. T „ wa Mme 702203 —E7 0
`s
o:
DIV GRID LOC. ELEV.
I ssy.Mlc e•a•vs
1°r� '""T FILO soLTs IENcrN Nob HP No PIECE
z z U' GIA Y oO _S T A w• MARK PIECES DESCRIPTION LENGTH UWT NIT GRADE REMARKS
p 168(WS)
p170(F/S) 9116 1 160 1 703A STAIR-2 1897
p169 ` p171171 212 21 p195 1 703A MC12X10.6 10'-1113/16" 211 A36
N 2 p167 REVIEWED 2 P167 FBv4x11n 0'-61/2" 1 A36
N LlREVIEWED AS MODIFIED 2 pies FB1/4X2 a 6518" 1 A
a ❑REVISE AND RESUBMIT 2 p169 FB1/4X2 0•-2 Mr 0 AM
2 P170 FBI/4X2 0'-4314" I A36
❑NOT REVIEWED 2 P171 FB1/4X2 V_i(r 1 AM
I �
I Reviewed only as to general conformity with the 1 p176 PL3/16x7 5'-T 26 A36 (FORMING)
{ I design concept.The Engineer does not warrant I P177 PL3/I6X2I 13116 5•-r 78 A36 (FORMING)
or represent that the information contained on 17 P178 PL3/16X2113M6 5'-7" 8D A36 (FORMING)
this drawing is either accurate or complete.
I P'184 MC12Xt0.6 19'-1113116' 211 A36
Sole responsibility for correct design,details and 2 PISS 1.00318 0'-5" 4 A36
dimensions shall remain with the party
submitting the drawing.
P176 POGGEIMEYER DESIGN GROU INC.
By
F� o(, 01WE,
N_7_
r - l.l'.�wL
178 p178 ,78
p169 p194 P P178 pi78 p178 p178 p178 p178 p178 p178 p178 p178 p178 p178 p178 P178 p167 "
P168(N/S) r
p170(FS) P171 212 212 P195
1 180
IL/4
TVP
16'-891a(MC 12x10.6x19'•11/316) TYP
,4 p168(F/S) \ 16
16'8116 14 P169(WS) \ 1 p178
g58 P169 PS) TYP p178
P194(N/S) 16'-112 p194(WS)
TYP 703A(F/S)
703A(NIS)` 7310 TYP 1 4 703A(p 194 NS) TYP
; \ ti , ,P178
p,68(WS)
p168(FS).1 816 10916 10016 1012 1(38'6 10916 10'2 10816 10816 108th 10016 10816 1012 10816 10818 10916 1012 10818 1012 314 PITO(F/S) ' / TMP 8 1"08" o n
P,169(WS)
d a
pi69(FS) \
P171WS) e--_---<
\'\N
I 7�s7s { { P171(F/S) -
— — — N TYP I6 TMP
— -I- - _ + _ — T �— — — - W I P178 6 1
—�._ —r— + _IG_ + —{— } —{— -{ —f— -E — I — — —m DETAIL DETAIL
rt rr rr i'1 4- —I— + —{— -f- —f— --{- —-I— 4 — — --`° � (PYP WELDING DETAIL)
p170(WS)r r p178
p 170(F/S) r p178
p171(N/S) IN -1 Ips I _I I ri
pl7l(FS) L 7g— t- —I — i- —f— -I- —f— + —{— T
p178 Nf\ �0gis r- —I — {- —r— -f-- —�— -I- —I— + -{ P177
p178 _ t N \ 7 — — — p178
� � p194(WS)
cD f. 703A(F/S)
p178 1 w 7,
B e2�s_f— -f —i— -I- —{— -i — — --^� 46 pl76
p178 l .\ � 7s 1 —I— -{- —f— -{ — — --m , p167(N/8)
I I e p167(FS)
p176 L cv \ 9rs 7" a
p 178 L N N\ wig'` t-- -{-- —� — -f- - — — 4' a �,EI� e y ---l \
COMMENTS ® 3 SIDES TYP e
p178 =1 N 1- —� N CE�{:� €�e ES MADE BY 4
p,76 I —{ — -{- --F — — CI O T $�SHOP DRAWI[VGS ,
' " \ j'e UB ITTALS,ECT ARE SU pl95(WS) 2 z 8 ,"
p178 L �s t —L_ �.— — _ p195(F/8) t
P178 "�— t- --� — — O RCHITECTS REVIEW. ;',/ J; 9,6
'.p1178 , " - '°e Y: DETAIL 3
1 N 7'�e CUi OUT - s '44.2
P178 - 1 C" ,s — E O CONSTRUCTION,INC.
p178 V,
p178
L
_ 7s- -mw
m �
p 178CONTRACTOR NOM.
THISGMU GI9SE rtiEO FpM/�PRGVAL
9REGl11ME°.Y9i1F1M p'(SLpKY A UANIr11
L° E3, -
p177 ALL OILENSIGNS.AU.mFOWMTIIXd,6-81.1.
P 167(WS)
14 �p 167(F/Sj PRINTRECORD 11r1s gum A szrosme FOMAwRowL a
P'76 No use oarE ° E7y%>< REV DATE DESCRIPTION
3 61316 P195(F/S) APP a asyzG s°um
W4 IoA3T5 um
095(N)S) CONSTRUCTION
111516 aFvrt eam
MuacN arc.ava.
9P-2 870 CaAsborO RU. Sequim,We 06382
FPBru"r GALYANILE° PhOnO:(360)243-8229 Fa (360)504.1153
1 STAIR 2 -Marked 703-8 "°'°E;` GATEWAY TTRANSPORranoNceNTeR
PRO DRAFT INC wa :anm.sesuzs SHOP NOTE F FFicE
GRIND SMOOTH ALL WELDS,BURRS, ce,»w°mawr` STAIR-2
g rvmre r�NOELEs_GnTFwA say 8 SHARP EDGES. DST PRIMO CONSTRUCTION INC.
Mm°n"szrzzrmys 16T:�9
E�cT "" osrzsrzaoe s`n maznysy �"702203 7(13-8
MC12X10 6 x 19'-111316
19'-6516 5916
358 71316
12
`4
r6 60
A
M
� M �
W
N �y
00
d' ry
M
00
c0
LO(U
co4 L
91516 M ID REVIEWED
�.. U PEVIEWED AS MODIFIED
12 I7 REVISE AND RESUBMIT
C,UNOT AEVIcWEE) BALancC-
of stT
Re Cited only as to general conformity with the
design concept,The Engineer does not warrant51116 31316 138
o, represent tilat the into-niation contained on 71316
th;s drawing is either accurate or complete,
vc•ra"r?,;?or;sitaii ty for correct design,details and 1078
dimer :ons shall remain with the party
W'Mitiir•g the dewing,
E °ri:` D DESIGN GROUP INC.M
ENTS [3
AN I x..114. IES MADE BY
PCI TO T€-i SHOP DRAWINGSD"Ate;ti� R-
SUBMI i IALS,ECT ARE SUBJECT
TO ARCHITECTS REVIEW. 1/4 , J
BY' F tr�� Na In assembly
DATE:— P yb=i 1 703A
PRIMO C0*15TRUCTION,INC 703A MC12X10.6 A36 1 1 9' 11 13(16" 6789.36 210.9
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 6789.36 2109
PRO DRAFT INC DRAWING NUMBER, W [703 A]
##205-12332 Pattullo PI. CONTRACT NO- PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3PH.ffA 5&96425 FAX-6QA 9 7747 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
0
DIV GRID LOG ELEV,
I 051-J
RELD9ars LENGTN Nolo SHIP No PIECE UNIT
DIA A3OLT BOLT 1 I/d
MARK PIECES DESCRIPTION LENGTH GRADE REMARKS
z z W.
IMA wEOLE_ear w•
1 704A RAILING 25'-,0'(AST) 358
18'-71310 1 704A PIPE-1-114"0 SCH._40 58 A53
3 p172 F81/4X2 01-8' 1 A36
1134 16'$318 1178 1 p173 F81/4X2 0'-81/Y 1 A36
1 p174 F83/8X31/2 OL6 ire 2 A36
71518 16-134 1'10318 1 p179 PL.SN8X15/8 0'-15/8' 0 A36
2 p180 PIPE_1-1/4"0_SCH_40 3'-29/18" 7 A53
5'-491815 p181 PIPE_1-1/4"0_SCH._40 5J 11/16' 15 A53
64918 5'-49,8 10518 1 P182 PIPE_7-1/4"0_SCH._40 59 A53
5 pi93 ROD1/4 0'-43/18" 0 AN
@ 6 25-4`(ABT)
p193(N/S)
P193(F/S)
p182
704A
\ \ �p179(NIS)
m A
Al @ C
e 3 1134
p193
° 1 \,1 Qre \ 71515 37e p182 31e 31e
18 � r
P181m pi93 ^
TYP
4
Q m
704A RI p193 I 1e TYP
m \• pi93 15 6 p179 p181 B B
\ A \ \ �w \I P180 7 ,e 6 7D4A
2 2 \ \h^� \ \ `� P193(F/S) 1'115,e 316 —
P 173 1
\ ^ \ M ' •\ ram r�,r 1'-215
\ \ \ 12 6;t �rrre A A
'or@\ 704A
p173 2 2
TYP 2 180
704A P181 m /� /�
(c c c
cl
7� IF P180
vI p172\ \ \ \ ^\m\ p193(F/S) P173 2 2 P180
DETAIL 1 Pm72 234 234 ,e
N D D
9 \ \ �a171
\Br \ \\` \ P181 4 TYP
P181 P182 2 2
\ p174
w� \ I 4 TYP 'e 100
m nr \ \
'R`tlll=it�EU COMMENTS [] 2, \Br \ \
AN Y CSAS MADE BY \ \'\ p172 Q)
�,9 p172 \ \ \ P180 are III���
RCI TO TIS SHOP DRAWINGS
\ \ \ �wm 2�
T SUBMITTALS,ECTARE SUB1ECf E E
TO ARCHITECTS REVIEW I p193(F/S)
M ,� \ I
BY DETAIL 2 m
�M � \ II
DATE. N N \1
PRIMO CONSTRUCTION
wp IV
CONTRACTOR OTE:
01 5�pqyJp� �9BE �5
, E' IEjAB REOUR®G ER FYNC116 TVALL DUANi1 ES
�q p 172 ALL DIWEII W ALL INFORWA .&ALL
?3 PRINTRECORD weB " fine 0UM A 220508 I FORAPPROVAL DJ
4 4 2 2 P174(F/S) No I usE i DATE r E7= REY DATE DESCRIPTION
ars
APP 0 UM
APPPRIMO CONSTRUCTION
R 3/4!K 3/t WA't3 UM
PU OH DUp"—w
P2 970 Cer166org Rd. Sequim,Wa 98382
GALI'AIa2E0
FAB
P11on (360)2438229 Fax:(300)504-1163
111
1 RAILING -Marked 704A SHOP NOTE.r F o R� GATEWAY TRANSPORTATION ON CHJTER
PRO DRAFT INI mw . r nEl
9_ GRIND SMOOTH ALL VIEWS.BURRS, RAILING
RT-A ORE GATY
mrnAosPAer�A®o m po,Al 8 SHARP EDGES.
PWWIO CONSTRUCnON INC.
WJBN EWASb
Yb1—ZrZZQXB I6M32
"DJ DJ
ER " osr2umce Osronae f702203 T04h
16-134
I
i
I �
I
I
12
� M
r
` 1
I
12
'i ' N
o
_ ti cri
I
C�2E
&v,1 :. ~E;MADE BY
FCI T�` f�°, ,"OP DRAWINGS
SUBMI-n-ALS'ECT ARE SUBJECT
TO ARCHITE( rs.REVIEW
BY.
DATE: f No In assembly
PRIA�O 25' 10' (ABT) 1 7oaA
CONSTRUCTI®NP£NC. 704A PIPE-1 1/4"Pl_SCH._40 A53 1 ® 159374 58.3
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1583 74 1 58.3
11 PRO DRAFT INC DRAWING NUMBER, w [704. A]
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE. 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FORAPPROVAL ISSUE DATE. 00/00/0000
DIV GRID LOC. ELEV.
1 Ob08°J 1'�9A1
roTu ur° nL ews 1l=NGTN Nolo I No PIECE rUNIT T MARK PIECES DESCRIPTION LENGTHGRADE REMARKS
705A RAILING 28-10'(ABT)18'-8118 1 705A PIPE1-1/4.0_SCH._40 A53
1118 101516 3 p172 FBI/4X2 0'-8' An
11761 p173 FBI/4X2 0'-81/2' A38
1 P174 F83/8X3112 0'-61/2' 2 A36
7118 16_1341'10318 2 pl80 PIPE_1.1/4"0_SCH._40 3'-29/18' 7 A53
15 p181 PIPE_1-114"0_SCH._40 8'-411/16' 15 A53
I p192 PIPE_1-1/4"0 SCH._40 56 A$3
6'-4918 V-4018 5-0918 10516 4 p193 ROD114 0'-43/16' 0 AU
9B
24'-7'(ABT)
p193(ws) I bl TYPE-CVVELD-ON END CAP (BUYOUT,
p192(wS)
pbo t
705A
m A \ \
706A
P1a 318
m
ui m \ ptB2 p192 705A
A° p7� '\ \ TYP iV P193 p 181
_• \ 7b7 B TYP
7116 378 18
P180 101818p
p173 pl93(N/S) A A B B
0 \ \ \ \ 12 vIf ;t ,s
706A
. p173 2 2
TVP m
tv \ p,e 181
705A
V^ C
cl
p193(N/S) 173plao
2 2
24 \ \ \ \
\ \ \ \ \ \ \ \ e(s DETAIL 1 m p12 234 234 160
D D
p181 4 TYP
p181
\ "a
m \
m \ \ \ I TYP p192 2 2
p,
vi of \ \ '�.
4 a P174 2 1
y 3
p172 O
COM E9IN[S 0 pig \ \ n m p180
, f '�Ci,-j. =ES MADE 13Y239 \ \ \ M \'
PCI`f 0 T;- \ 3'B
�m SOP DRAWINGS
UBMI-FIALS,ECT ARE SUBJECT' \ \ m\ \ \ \ E E
" O ARCHI_TCLTS REVIEW", !' —,4,- \M N �\ \ i\ P193(ws) I m DETAIL 2
ATE.
('�;� (SIM) I ro
RI 10 C✓It�S"HUCTION,`NIc. m N
� m �
J m I ♦ AS REQLYREDGVENFYIWOR TION' 71E9.
pl CONTRACTOR OTE:
m 234 l ALL DI°.ENSONe ALL INPpi TIDN,IAL
p172
PRINTRECORD °rex xme° 13/18 Bu,N
234 0. DATE E7Wcx REV DATE
FOR APPROVAL DESCRIPTION D,
2 2 p174(N/8) SPA °al AMGP-10DN
' APP �/ PRIMO CONSTRUCTION
PIktCH IVp�R MSAr
6p 870 Cedebwg Rd. Seq..-,We 98382
FASGALVANIZED
Phon (360)243-8229 Fac(360)604-1163
vmxf
1 RAILING -Marked 705A SHOP NOTE: -0 o ^°"°'GATEWAY TRPNSPORTA ON CENTER
PRO DRAFT INC PDH .rlU°a>:a 25
GRIND SMOOTH ALL WELDS,BURRS, DA p41H01N0.1q`0 RAILNG
Awax6°p6°pAA®�n:T vmM 8 SHARP EDGES.
A mro 1u_PORT WAGE GATEWA�a9 D� PRIMA CONSTRUCTION INC
YbI U°1e OYR/dIOB 163 Z2
enECT x Oosmrzow Dova�oe NW0F702203 '05A_ a1
16'-134
I
I
� I �
I
ch I
I
I
i
12
w 79,
r 3 M `
� h
� M
� r
Lo
� O
I
I
RLt aR ' a`a
CD
AL IMNT$ N
PCITUT-t 5MADEBY
ti I ch
SUBM17S SHOP DRAWINGS 12 I
TO ARCHITECTS ARE SUBJECT
BYREVIEW. ,p -
DAT �-- _
PRIMO CONSTRUCTION,INC.
25' 10"(ABT) No In assembly
1 705A
705A PIPE_1 1/4"PJ_SCH._40 A53 1 159374 58.3
MARK I SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 159374 53.3
PRO DRAFT INC DRAWING NUMBER, w [705 A]
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE. 05/22/2008
PR 804 559 649.5 EAX 804 W 774 Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
SICIN0
DIV GRID LOG ELEV.1 GRID
1'J'
rota` uaT FlELnears F.ZTx Nolo SHIP No
MARK PIECES MARK MERE DESCRIPTION LENGTH WT UNIT GRADE REMARKS
p183
p188 1 706A RAILING 14'-2•(ABT) 207
p188 1 706A PIPE 1-1/4'0 SCH._40 32 A53
p185 Y .P188 3 p183 PIPE 1-1/4"0_SCH_40 3'-53/18' B A53
p185 — 4— — — — —
p185Y 7 PISS PIPE 1-1/4"0_SCH._40 1123/4' 3 A53
P185 •P1 5 �� P6 P188 PIPE 1-1/4`0_SCH._O V-41/1' 10 A53
p1B3 _-P185 P1 PISS PIPE 1-1/4' _SCH_40 4'-1° 9 A53
P188189 0 P188 7 p190 PIPE 1-114'0_SCH.40 4'-0' 9 A53
m
'1
H
P190 I P190
p190 „ P190
P190 �� i, P190
P190 I P183
f
i
RENEE 3EQ COMMENTS p
ANY CH; ISMADEBY I 708A
PCI TO TF(L HOP DRAWINGS
SUBMITTALS,ECT ARE SUBJECT 50318
TO ARCHITECT]S REVIEW A A
BY
DATE: c —i
PRIMO CONSTRUCTIOrd,!;fir,
6-334
5'-03te
8 4'-0 734 �'--• X34 4'•412
706A t4 TYP I A 706A J —Al
1Fl p190 p1B5 P1B8(NIS) ;� p190(F/S) PISS -— — — — — —
P189
'Fl I p190 I p165 P18s(N/S) � p190(F!S), — — — — — — — — — —
P1B5 I P188
'n I P190 PISS p18s(N/S) p190(F/S)
— — — — — — I pim I P188 — I
N ^ p190 I PISS p188(N/S) p190(F/S) PISS I
— — — — — — — — — — — — — P188 N
1D P190
p185 I p188(N/S) n' p190(F/S)
I P-185
I wPies
190 P188(N/S) 190(F/S)
- - PPISS P188
.—
— — — — -- ---- --
—
I
N
P190 SP189(WS) p190(F/S)p185 PISS i 188
Y — — — — — — -
- — — — "-- — — _ _ _
P183 id— TMP TYP — — -- —
�PIRINT
Ns ci we sueMrT oFo AP B
1
D D 14 ( p183 I p p183(WS) p1� I CONTRACTOR NOTE: p oyq
B D 312 B FE NSION ALL ItFORANT kJALLAAu
NiIT1E6.
RECORD ” fans ou" q nos.® FOA APPROVAL pd
0 USE I ATE EM)O( REU DATE DESCRIPTION
ITIL
APPR s M 0A=UM PRIMO CONSTRUCTION
PUNCH p.2 970 Cadaborg Rd. Sequlm,Wo 98382
1
Phone(360)243.8229 Fear:(360)504-1153
FAB ' GAIVAtdZEO RAILING -Marked 706A FAB OFFICE
PRO DRAFT INC rota PHPAB;n SHOP NOTE. ,A Er GATEWAY TRANSPORTATION CENTER
QA ReW�°Et RAILING
�m PAI GRIND SMOOTH ALL WELDS,BURRS, PPJ.00NSTRUCTION INC
erodlw- w_1> Poor ANGELES GATEW Y sro 8 SHARP EDGES. QA
waume.lsra2Ve 1s2s.1s
Eltec °o�amzo® �pae¢ueooB �°702203 706A Q
5'-014
6-014
fA A
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
I
I I
I
I
I
I
I II
I
I _o
I CV ce)
I � I
I
M I
I M
I Co
I I
I
I
I �
u7 I
I �
I
'-D
Ai 312
PG rp Tr 'SH FS I MADE BYG�r`�FflITS
'rOS, AR I�ALS C,qR���GS A - A
BY CHl7 ECS RF E SUBJECT �.
VIEW ,
NSTRUC77QR! P
No
14 2"(ABT) In assembly
1 706A
706A PIPE 1-1/4"0-SCH._40 A53 1 1 862.18 31.5
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 862.18 31 5
PRO DRAFT INC DRAWING NUMBER, W [706 A]
#205-12332 Pattullo P1 CONTRACT NO PROJ # PLOT DATE 05/22/2008
ER UA 582 6495Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE. 00/00/0000
0
DIV GRID LOC. ELEV.
1 091K 314'
1OTAL "" FIELD BOLTS ReNcrN Nob SHIP No PIECEUNIT
MARK PIECES MARK DESCRIPTION LENGTH WT. GRADE REMARKS
1 707A RAILING 15"X(ABT) 240
1 707A PIPE_1-114"12_SCH._40 35 A53
3 p184 PIPE_1-1/4"0_SCH.40 2'-113/16' 7 A53
11'1034
8 p186 PIPE_1-1/4"0_SCH._40 1'-10314' 4 A53
1 p187 PIPE_1-1/4"0_SCH._40 1'-45/16" 3 A53
P186 p186
18 p191 PIPE_1-1/4"PJ_SCH._40 3'-911/18' 9 A53
p186
p186 � p186
P186 p187
m
P191 P191 P191
I
707A -P191 ip184 191 p191 �p184 P191 +
!p191 184
— — — F p
pi 91
zi
P191 P191 p191
'p191 P191
P191 p191 A A P191
11'1034
3-81176
3"911's534
,-911tB534 1'-534
3'-91716
a
6
W" .707A TMP 4 B
- - — - - - — - - - - - - — — — A 707A
— - - -
h p191 P191
— — — p191 186 P191
P 186 n
P191 I p191
— — — — — I P191 — I p186 I P191 I 188 w1
P191 p191
— — — — — — — — — — — -— — — — P191 — — — — p168 p191 186 H
iv p191 p191 I I a
— — — — — — — p191 p186 9 p191 188 I in ion
— — — — I P191 — — — — — — - -� — —
— — — — — — — — — — — _ I P191 I p186
P191 I
— — 188
'u1 I p191
_ p191 it p191
— — — — — — — — — -— — — — — — — — — — — — — — — — — P186 P191
— — — — p184
u — — — — — — — I M * a
P — I P184— — — — — — — — — — — — — —.. — _. — — — _. — — — — —
TYP TY167 I us
a 4 I p184 — —
P784 I w
p187 � 1q
51618 111316
REVIEWED
ANY CRAW EES IbiADE BYDMMEWs B B
PCI TO THE -
SUB NII7TAL5HOP DRAWINGS
TO ARCHITE e ECT ARE SUBj
BY REVIEW
DATE:
/��y[a{/,/ - CONNgTpRRAOTSgOER NOTE
rTED Fop qpa VAS
PRIMO CONST
R]��0� 4 AB ENURED 8eLLlW0PA%LVALLOINNTITEB,
(,f INC- ALL AENBIONS,A111fffNRNATIDN,&ALL
e NPRINTRECORD 0EN1g16 13ne muM q zws,Oe FORAPPRNVAL v3
NO USE ATE Um REV I DATE DESCRIPTION
APPIL n X0AX25 UN PRIMO CONSTRUCTION
PORCH °�PR$S SP'2 970 Carlsborg Rd. Sequlm,Wa 98382
Phan (360)243-8229 Fe (360)504-1153
FAB r GALVANRED
1 RAILING -Marked 707A FAB.OFRCE0 E GATEWAY TRPNSPORTAT ON CENTER
PRC)DRAFT_ INC Pura :PB(B4j5W.W25 SHOP NOTE. Na °,•„„„"a'°°, Rwut
w.. r°Ta
CF23fA0B 16304 GELEs ATEWAY 539 GRIND SMOOTH ALL WELDS,BURRS, DI PRIMO CONSTRUCTION INC
Abtl xe anErAaFfl ou � &SHARP EDGES.
YI°I Ue4
ERE "D05J8 D -702203 —7O7A A
11'-1034
fA —A
- - - - - - - - - - - -- - - - - - - - - - - - - - -
r�t
M
�
11'-1034
70,I
4yM
0 - C,.a' nom
0 `d ray 2,
C6 n i
�y t
I
CN
I
I
I
A A
No
15'-9" (ABT) In assembly707A
707A PIPE 1-1/4"0 SCH._40 A53 1 96774 353
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 96774 353
PRO DRAFT INC. DRAWING NUMBER. W [707.A]
#205-12332 Pattull0 Pl. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
Ij 47
0
DIV GRID LOC ELEV
1 0.5-0.8/J 27 g 1/4 E41
UNIT FIELD BOLTS LENGTH PRO DRAFT INC PDI# PH:(6pq)589.6411
4 3/4" DIA WEDGE_ BOLT 4 1l4" DRAWINGS PREPARED ON lll%gxl File Name A [708.A]
Model Name: 749_113–PORT ANGELES_GATEWAY 539
Plot Date: 05/22/2008 16:19:46
L3 X2X14x6-718
234 1'-858 11-858 1'-858 21 2
708A
c) -- —
M
REVIEWED �J
ANY CHAp4c.' S MADE gCO COMMENTS
PCI TO THE SHOP Y O
SUBMITTALS,E� DRAWINGS
TO ARCHITECTS REUB.IE
By.
PRINITE: t,
Q CQCONTRACTOR NOTE
RUCTIQ/1j�IRj THIS DRAWING IS BEING SUBMITTED FOR APPROVAL
Eti AS REQUIRED.VERIFY OR SUPPLY ALL QUANTITIES,
AL DIMENSIONS ALL INFORMATION,&ALL
CONRIGURATIONK
PRINT RECORD OPENHOLEe 13/18 QJuM
A 22105/08 FOR APPROVAL DJ
NO. USE DATE WELD E70XX REV DATE DESCRIPTION
1
APPR. STEEL A992 GR.50 UIN-
CLIP—ANGLE -Marked - 708A APPR. DOLTS A992
pfA325U1N PRIMO CONSTRUCTION
PURCH SURFACE PREP-Sp
SP-2 970 Carlsborg Rd. -Sequim,Wa, 98382
1 708ACLIP_ANGLE 23 FAB GALVANIZED PAINT Phone- (360)243-8229 Fax: (360) 504-1153
1 708A L3 X2 X1/4 TJ 1/8" A36REFARAWING OJECT
23 FAB.OFFICE E7 GATEWAY TRANSPORTATION CENTER
O.A.
IS DRAWNG INCLUDES CLIP ANGLE
No SHIP No PIECE DIST OR PRIMO CONSTRUCTION INC.
to DESCRIPTION LENGTH GRADE REMARKS WEIGHT ADVANCE DRAWN DJ CHK DJ DWGNUMBER
SHIP MARK PIECES MARKS BILL ERECT
DATE 05/20/2008 DATE 05/22/2008 702203 — 708A
DIV GRID LOC ELEV
TOTAL UNIT FIELD BOLTS LENGTH PRO DRAFT INC PDI# PH:(IN)589-1425
4 0.5-0.8/J-K 27'10' DRAWINGS PREPARED ON 3D.M File Name A [709.A]
4 0.5-0.8lJ-K 27' 10"
Model Name: 749L_1 13_PORT_ANGELES_GATEWAY539
4 0.5/J-K 27'10'
Plot Date: 05/22/2008 16:19:44
4 0.5/J-K 28'-4'
4 0.5/J-K 28'-4"
4 0.5/J-K 28'-4
4 0,5/J-K 28'.4
p129 p129
N �
d' X
N
709A /qi jaq
S�j�T�T . 14 P
FB 2X4 x 6 Tp e%lt�"Zs/ySMgO c0
ey, 9�Fop �e M F
709A 1 4 1 p gjF �5�
RFViR�6'�'i��ss
p129 (F/S) c� �
/p129 (F/S) srRU�o
N
N
CONTRACTOR NOTE
THIS DRAWING IS BEING SUBMITTED FOR APPROVAL
AS REQUIRED.VERIFY OR SUPPLY ALL QUANTITIES,
ALL DIMENSIONS ALL INFORMATION,&ALL
CONFIGURATION§
PRINT RECORD OPENHOLES 13118 0U/N
A 22/05108 FORAPPROVAL DJ
NO. USE DATE WELD E70M REV I DATE DESCRIPTION
8 - EMBED -Marked - 709ASTEEL
APPR. /N
3GR.50 PRIMO CONSTRUCTION
APPR. aoLrs 3/4/4 QIA325 U
PURCH SURFACE PREP-SP
8 709A EMBED 3 SP-2 970 Carlsborg Rd -Sequim, Wa. 98382
PAINT Phone (360)243-8229 Fax: (360) 504-1153
8 709A FBI/2X4 0'-6" A36 3 FAB GALVANIZED
16 129 STUD-1/2-DIA REF.DRAWING PROJECT
p 0'4 A108 Q FAB.OFFICE E7 GATEWAY TRANSPORTATION CENTER
Q.A.
IS DRAWING INCLUDES EMBED
No SHIP No PIECE
DIST OR PRIMO CONSTRUCTION INC.
to DESCRIPTION LENGTH GRADE REMARKS WEIGHT ADVANCE DRAWN DJ CHK DJ DWGNUMBER
SHIP MARK PIECES MARKS
BILL ERECT ATE 05/20/2008 DATE 05/22/2008 702203 - 709A l A\
�O
yob �ZD
co
T
a
FB14X1 12 x 612
cv Xp167
r
No in assembly
2 703A
p167 FB1/4X1 1/2 A36 2 0'-6 1/2' 23.51 07
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 4703 14
PRO DRAFT INC. DRAWING NUMBER. W [p. 167]
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
FAX-604 589 7747 Kt--VIZSI N o-
mad�
y
�' c ssQv
h
0
F1314X2 x 658
p 168
CV
No In assembly
2 703A
p168 FBI/4X2 A36 2 0'-6 5/8" 30.90 0.9
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 6180 1 9
PRO DRAFT INC. DRAWING NUMBER. W [p. 168]
#205-12332 Pattull0 PI. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
604589 7747 `2=108o-
o n�0 �rn
X ns
n�D rp" Oy
,z
FB14X2 x 212
pl 69
N
No In assembly
2 703A
p169 FB 1/4X2 A36 2 0'-2 1/2' 12.23 04
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 2447 07
INC. DRAWING NUMBER. W [p. 169]
PRO DRMFT
#205-12332 Pattull0 Pl. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
PH:6045896425 FAk,604 CA 7747 NREVISLAN U^ IF-* 2270,510S
o-
i
ti
FB 14X2 x 43
p170
N
No In assembly
2 703A
p170 FB1/4X2 A36 2 0'-4 3/4' 22.46 07
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 44 93 14
PRO DRAFT INC. DRAWING NUMBER. W [p. 1 70]
#205-12332 Pattullo PI. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FORAPPROVAI_ ISSUE DATE 00/00/0000
o•
0
v c,
v1'
4F
co mn
FB14X2 x 10
p171
N
No In assembly
2 703A
p171 FB1/4X2 A36 2 0'-10' 45.98 14
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 9197 28
PRO DRAFT INC. DRAWING NUMBER. W [p. 171 ]
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
H-604589 AX-RUSM77A7 j /-% -777M708NO-
�O
k�co
0C �� �
O n a r'i
O
ar ry� P0
< % T
` �0
4
FB14X2 x 8 01
114 512 114
OD 2 - 11160
p172
N
No In assembly_
3 704A
3 705A
p172 FB 1/4X2 A36 6 0'-8" 36.94 1 1
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 221 65 68
AFT INC. DRAWING NUMBER. W [p. 1 72]
PRS DR
#205-12332 Pattullo Pl. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
L-4awewe: wmadr&acn No,
Zi
O
c k / A 2aZ
rill �7
o, s�� o
� b rf,
y
0
FB14X2 x 612
114 L 4 1, 114
ao 2 _ 11161
T p173
N
co
No In assembly
1 704A
1 705A
p173 FB1/4X2 A36 2 j 0'-61/2' 30.23 09
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 6047 1 8
PRO DRAFT INC. DRAWING NUMBER. W [p. 173]
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
SO-
1+0 C y
c -c n
CcD
FB38X3 12 x 612
114 4 114
(- 2 - 13 1
_ 13160
p174
N r'
M d-
M
r
No In assembly
1 704A
1 705A
p174 FB3/8X31/2 A36 2 0'-61/2' 52.97 2.4
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 10594 48
PRO DRAFT INC. DRAWING NUMBER. W [p. 174]
#205-12332 Pattullo Pl. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
Pl+804 589 FAk 604 50No'
5'-7 (PL316X7 x 5'-7")
p176 A
�a��y
A
o � ���' �,
O q-Y
�� o'y r
R-5 . Z, pasp'
e 4-n cv
134
cQ
p176
CD
1316
A - A
No in assembly
1 703A
p176 PI-3/16X7 A36 1 V-7' 992.88 25.7
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 99288 257
PRO DRMFTDA
INCA DRAWING NUMBER. W [p. 1 76]
##205-12332 Pattull0 PI. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL Pit 604 589 6425 FAK 6M 5M 7747 1ISSUE DATE 00/00/0000
o'
5'-7 (PL31 6X21 1316 x 5'-7")
p177 B
- - - - -- - - - - - - - - -- - - - - - - -
A A
B
4 lo, 4
p177
d. �r
co MIT-
IT—
LO LO
co
"f y
rz A - A N
y n7 r .
Cr"a�..
0c -
o � va 316 101'16 1116
mm�rn 3
4
cc 0
d' co
M r
® p177 � °°
co
0
r r
238 5 334
1118 1, 134
1134
(TyP)
N
B - B.
No in assembly
1 703A
_p177 PL3/16X21 13/16 A36 1 5'-7" 2954.86 776
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 295486 776
PRO DRAFT I NC. DRAWING NUMBER. W [p. � 7 7]
#205-12332 Paffull0 Pl. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
PH-6045896425 FQ6045M
o•
5'-7 (PL316X21 1316 x 5'-711)
p178 A
gn
316 L 10116 L1116
34
p178CO
CA� �
D
V_
f 00
co CU
r M
1118
1134 134
11 (TYP)
A - AN
No In assembly
17 703A
p178 PL3/16X21 13/16 A36 17 F-7" 3032.33 797
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 5154953 13553
PRO DRAFT INC. DRAWING NUMBER. W [p. 1 78]
#205-12332 Pattullo PI. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
No,
ct�p'y
f CSP?
f
o
co
p
3
4
PL316X1 58 X 158
p179
R 1316
No In assembly
1 704A
p179 PL3/16X15/8 A36 1 01-15/8" 5.35 01
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 535 01
fFT INC. DRAWING NUMBER. w C�. 79�
PRO D'M'
#205-12332 Pattullo PI. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
PR 96425 W60458977aNO'
PIPE 1-14"0 SCH _40 x 3'-2916
Q� N
7�
3 7s 71316
1 g
p180
516 11 1116
i
r'
1116
0:6a oa p180
SP
o 8
®
A - A
No In assembly
2 704A
2 705A
p180 PIPE-1-1/4"O SCH_40 A53 4 3'-2 9/16" 19564 73
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 78258 293
PRO DRAFT INC. DRAWING NUMBER. W [p. 1801
#205-12332 Pattullo Pi. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
PU 604 589 6425 FAX-604 589 7747 0
PIPE 1-14"0 SCH 40 x 6'-41116
516 138
p181
- 7'/- - - - - - - - - -- - - - - - - - - - -
- - - - - - - - - - - -- - - - - - - - - - -
- - - - - - - - - - - - - -- - - - - - - - - - - - - - - -
138 516
lo
71316
16
�,�-(5�tn -
1116
pl8l
0
R 78
A - A
No In assembly
15 704A
15 705A
p181 PIPE_1-1/4"OLSCH 40 A53 30 6-4 11/16" 393.74 146
MARK SIZE GRADE No LENGTH AREA - WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1181211 4366
PRO DRAFT INC. DRAWING NUMBER. W [p. 181 ]
#205-12332 Pattullo Pl. CONTRACT NO PROJ # PLOT DATE05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE EE00/0010000
p .'M4 rAq WS FAK 604 589 7747
wetrsk MuLd&cwn
18'-71316
11781, 16'-8316 1.1134
1'-11516 1 -11516 ,
co p182
2316 Lo
TA�
Al -
2316 1134
A - A
to
O / co
l� r
12
- S�1 j. T Ee ES 4 q1 C���E
8/ jai "Hop p 8 ws tj
p182 B o Arc `SES.6, DI WIM
4i g`S SU8GS
I � �E�E� , t
00 pl'�1�1 .E�
' E.
N o co 1 a 26'-4" (ABT) No In assembly
1
p182 PIPE-1 1/4"o SCH_4Q A53 1 704A 1627.65 594
MARK I SIZE GRADE L No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 1627 65 1 594
PRO DRAFT INC DRAWING NUMBER. W [p 1821
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE. 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE. 00/00/0000
0
rr7
co
0
.01 PIPE-1--1-4"O SCH 40 x 3'-5316
1316
p183
81316 - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -
q--- - -- — — — — — — — — — — — — — -- — — — — — — — — — — — — — — — —
No In assembly
3 706A
p183 PIPE_1-1/4"QJ SCH_40 A53 3 T-5 3/16" 211.80 78
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 63539 234
PRO DRAFT INC. DRAWING NUMBER: W [p. 183]
#205-12332 Pattullo Pl. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
FAX-604 589 7747 -0
ocnr
O3 --� ` � ;
( i . .
Q'UI _ .
c mO
orn
� °o
Nco
PIPE-1-14"O SCH _40 x 2'-11316
1316
p184
81316 - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - --i
No In assembly
3 707A
p184 PIPE_1-1/4"O_SCH_40 A53 3 2'-11 3/16" 18063 6.7
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 54188 20
PRO DRAFT INC. DRAWING NUMBER. W [p. 184]
#205-12332 Pattuito PI. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
0
�aoc y
h y 81
a 3
o
734 (PIPE-1-14"0 SCH 40 x V-234)
r it ' C�O
M
I I co
I I I
1316 I
I I co
p185 III
. I
81316 - - - - - -
r
-4
J - - - - - --
No In assembly
7 706A
p185 PIPE-1-1/4"O SCH _40 1 A53 7 1-2 3/4" 71.55 2.8
MARK SIZE I GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 50087 196
PRO DRAFT INC. DRAWING NUMBER. W [p. 1851
#205-12332 Pattull0 PI. CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
EH-604 589 6425 FaX.604 589 7747 m t--v lSl0
co
5.
zw
� s
1'-534 (PIPE_1-14"0 SCH 40 x 1'-1034)
M
r
1316 I
co
r-
co
p186 LOi
:-j4J
81316 - - - - - - - - - - - -
No. In assembly
6 707A
P186 PIPE 1-1/4"0 SCH_40A53 6 1 -10 314' 11319 43
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 67917 2,59
PRO DRAFT INC. DRAWING NUMBER. W [p. 186]
#205-12332 Pattullo PI CONTRACT NO PROD # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
0
111316 (PIPE_1-14"0 SCH _40 x T-4516)
B
fA A
p187
RI 1316
MLo
•�O
lie
�..
c�� 1316
pl 87
- - - - - - - - - -
— — — — — — — — — — — R 13
0 16
A A
M
r
I
� I
I
� I I
I
I � 1
p187
B - B
No In assembly
1 707A
p187 PIPE_1-1/4"Q1_SCH _40 A53 1 1-4 5/16" 7977 31
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 7977 31
PRO DRAFT INC. DRAWING NUMBER. W [p. 1 87]
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
Now
1316L 1316
p188
R1316 — — — — --- — — — — — — — — — — — — — — — — — — — — —
- - - - - - - - - - - - - - - - - - - - - - - - - - - - -
R 1316
4'-412 (PIPE_1-14"0 SCH _40 x 4'-412)
1316 1316
/088
t
i
O
No In assembly
6 706A
p188 PIPE 1-1/4"0 SCH_40 A53 1 6 4'-4 1/2" 26779 10
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 160675 598
PRO DRAFT INC. DRAWING NUMBER. w [p. 1 881
#205-12332 Pattullo P1 CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
PR 604 589 6425 Ak 604,599 7747 10
1316 L L L 1316
I I Z
p189 1
R1316 -- - - - - - - - - - - - - - - - - - - - - - - - - -
- — - — - — - — - — - — - — - — - — - — -
- - - - - - - - - - - - - - - - - - - -- - - - - - --- R 1316
4'-1 (PIPE 1-14"0 SCH 40 x 4'-1
1316 L 1316
p189
- - - - - - - - - - -- - - - - - - - - - - - - -
— - — - — - — - — - — - - -
- - - - - - - - - - - - - -- - - - - - - - - - - - - - -
jh,
yob
P6
jt
No
In assembly
706A
_P189 PIPE-1-1 4"0 SCH 40 A53 24961 93
-MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 24961 93
PRO DRAFT INC. DRAWING NUMBER. W [p. 189]
#205-12332 Paftullo P1 CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
M4.8. FAX 04 5§9 7747 -oFZE=0r-j 0A I 227057LM
ebsqes wwwgddincon -
131611, L 1316
p190
R1316 — — — — — — — — — — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — - -- — — — — — — — — — — R 1316
4'-0 (PIPE_1-14"0 SCH _40 x 4'-0")
1316 1316
P190
�jhvy
_7
r
Q
No In assembly
7 706A
p190 PIPE-1-1/4"O SCH _40 A53 7 4'-0" 24444 91
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 171106 638
PRO DRAFT INC. DRAWING NUMBER. W [p. 1 90]
#205-12332 Pattull0 P1 CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
0
1316 log 1316
P191
R 1316 - - - 2-
13 316
31-91116 (PIPE 1-14"0 SCH 40 x 3'-91116) 01
1316 1316,
P191 I
--- - - -- - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - -
;''cz
No In assembly
18 707A
P191 PIPE 1-1/4"O-SCH 40 A53 18 3,-91 232.36 87
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 418251 156
PRO DRAFT INC, DRAWING NUMBER. W [P- 191 ] 05/22/2008
#205-12332 Pattullo Pl. CONTRACT NO PROJ # PLOT DATE OO/Oo/
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
I PR604=gZ5 EXX-604W7747 m_ Z Uts
-4 No' IA
WebsRe: wwpMftaffhQQpm KEW,-W-M
18'-7
101516 , 16'-8316 1111781,
\
\
p192 (RIS-11 \
\
\
\
7
9•
\ \ '7
071
\ � o
T \
M \ O
I� \
12 co
\ r-
\ M
\ cT�
\ i
\ co
\ r
\
\
\
ANYSFO - -
PC/TOT 'ACES CO co
B•Ml AESNO � YNM/yEBCal
TOHEFV oR / � �By 7 , -1
AT
i
PRIMO i
24'-7" (ABT) N�' In assembly
1 705A
p192 PIPE-1 1/4"0_SCH._40 A53 1 152619 55.7
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 152619 55 7
PRO DRAFT INC DRAWING NUMBER. W [p 1921
#205-12332 PattuHo PI CONTRACT NO PROJ 0 PLOT DATE 05/22/2008
Surrey B.0 V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE. 00/00/0000
58L EAX-804 589 774Z0
�oco
0 .71 °�� �
nn� f 17
0 a�� m
"y �
c& ��0L
O.1 -2 Oa
2716 (ROD14 X 43 16)
0
p193
co
2316
No in assembly
5 704A
4 705A
p193 RO131/4 A36 9 0'-4 3/16' 3.36 01
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 30.27 05
PRO DRAFT INC. DRAWING NUMBER. W [p. 1 93]
#205-12332 Pattu110 PI CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
NM Mq 7747 r- mTZLMM0r-j
o• Ak
MC12X10 6 x 19'-111316
19'-6516 5916
358 71316
12
04
M 216 6s8
p194
w
�2
M M
0)Lo � _�
N
� N
d'
C.0 co CD
CD cD
co
- - - - - - - - - - - - - - - - - - - - - - - - - - - — — — — — — —
w
91516
12 N
51116 31316 138
71316 le
1078
REVIEWED
RkA.---C
MC1—fo— - O
tiESHOPDR4SUg r7tC7A0RRC5RESBME11/1S
Q
�
-E. EVIE{�/ j Na In assembly
DA,
pl 1 703A
.NC, MARK SIZE10.6 RADE iNo 19' 11 13116-LENGTH 6789.40 AREA 210.WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 678940 2109
RAFT INC DRAWING NUMBER. w (p 194,
PRO D
#205-12332 Pattull0 PI. CONTRACT NO- PROJ # PLOT DATE 05/22/2008
Surrey B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
0
p19504
1 - 1316Q�
3 n
o ¢ a ox
MR 212 212
L4X4X38 x 5
p195
No In assembly
2 703A
P195 L4X4X3/8 A36 2 0'-5' 85.78 41
MARK SIZE GRADE No LENGTH AREA WEIGHT
MATERIAL LIST FOR WORKSHOP TOTAL 171 55 81
PRO DRAFT INC. DRAWING NUMBER W [P- 1951
#205-12332 Pattullo PI CONTRACT NO PROJ # PLOT DATE 05/22/2008
Surrey, B C V3V 8C3 REVISION TEXT FOR APPROVAL ISSUE DATE 00/00/0000
o-
PREPARED 6/13/08 9 48 06 INSPECTION TICKET PAGE 2
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 6/13/08
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PHONE
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
provide access to remove hvac/roof access ladder sprinkler
is in the way of using ladder safely
BLI O1 6/13/08J BLDG INSULATION
19 June 13 2008 8 57 31 AM 1pangrle
RANDY 461 1391
EXTERIOR INSULATION'
COMMENTS AND NOTES
C
PA A
PREPARED 6/10/08 8 57 58 INSPECTION TICKET PAGE 1 w
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 6/10/08
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PHONE
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
-- - --- --- --- ----
PERMIT BPC 00 BUILDING PERMIT COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
BLHD O1 4/15/08 JLL BLDG FRAMING HOLD DOWNS TIME 01 00
4/15/08 DA April 14 2008 4 59 32 PM 1pangrle
TOM (CONSULTING ENGINEER) 360 915-4149
HOLD DOWNS TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30-MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
April 15 2008 4 27 32 PM jlierly
missing hold down/verify with engineer the change in type of
hold down/missing nailsin shear/ washer required on sill
plates per code/jll
BL9 01 4/15/08 JLL BLDG SHEARWALL TIME 01 00
4/15/08 DA April 14 2008 5 01 27 PM 1pangrle
TOM (CONSULTING ENGINEER) 360 915 4149
SHEARWALL NAILING TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30-MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
April 15 2008 4 27 32 PM jlierly
missing hold down/verify with engineer the change in type of
hold down/missing nailsin shear/ washer required on sill
plates per code/jll
BLHD 02 4/24/08 JLL BLDG FRAMING HOLD DOWNS TIME 01 00
4/24/08 DA April 24 2008 8 32 29 AM 1pangrle
RANDY 461 1391
HOLD DOWNS
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
April 24 2008 3 36 07 PM jlierly
eng to approve change for different holddowns actually
used/ROO
BL8 01 4/24/08 JLL BLDG ROOF SHEETING TIME 01 00 � /J G,1)/��/✓) J
4/24/08 AP April 24 2008 8 36 20 AM 1pangrle
RANDY 461 1391
ROOF NAILING & HARDWARE
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
April 24 2008 3 37 00 PM jlierly
BL9 02 4/24/08 JLL BLDG SHEARWALL TIME 01 00
4/24/08 AP April 24 2008 8 34 44 AM 1pangrle
RANDY 461 1391
SHEARWALL
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
April 24 2008 3 3 07 PM jlierly
BL3 01 6/10/08 LL BLDG FRAMING 1
June 9 2008 3 08 18 PM 1pangrle �-
RANDY 4611391
FRAMING TRANSIT BLDG
COMMENTS AND NOTES
BUILDING DIVISION
CITY OF PORT ANGELES
�Qp
\ t'01
V'
01 Correction Notice
Yv SJ\
Job Located at
Inspection of your work revealed that the following. is
not in accordance with the codes governing the work in
this jurisdiction
}
vt 14;�- I -n
These corrections must be made and are not to be
covered until reinspection is made. Whencorrections
have been made, please call
for inspection
Date j a CI
Inspector for Building Division
DO NOT REMOVE THIS TAG
PREPARED 6/04/08 9 27 31 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 6/04/08
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PHONE
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
-- - ------- - --- -- -- -------- ---
PERMIT PL 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
PL1 01 2/29/08 JLL PLUMBING UNDER SLAB TIME O1 00
2/29/08 AP February 29 2008 8 52 24 AM 1pangrle
RANDY 461 1391
UNDERGROUND PLUMBING
AFTERNOON
February 29 2008 4 14 16 PM jlierly
PL2 01 6/04/08 PLUMBING ROUGH IN
June 4 2008 8 18 31 AM 1pangrle
TODD 301 9945
'ROUGH IN PLUMBING ON THE PLAZA BLDG
INSPECT ASAP (THE WORKERS LEAVE AT 3 00 PM)
COMMENTS AND NOTES
AGREEMENT
THIS AGREEMENT is entered into this day of June, 2008 by and between the City
of Port Angeles, Washington, a municipal corporation, hereinafter called "City" and the Clallam
County Economic Development Council, Inc., a non-profit corporation, hereinafter called
"Contractor "
WHEREAS, the City is a municipal corporation of the State of Washington authorized to
contract for economic development services, and,
WHEREAS,it is in the public interest for economic development activities to be performed
that will enhance the economy and employment opportunities in the City of Port Angeles, and,
WHEREAS the City has need of research and assistance in regards to these and other aspects
of its operations,
NOW,THEREFORE,in consideration of the above representations and the mutual covenants
and agreements herein, it is agreed by the parties as follows
1 PERFORMANCE BY THE CONTRACTOR.
A. Promote Economic and Employment Opportunities.
The Contractor shall promote and enhance economic development and employment
opportunities in the City in accordance with the mission and goals set forth in the attached
Exhibit "A" The Contractor shall use its resources to market the facilities and capabilities
of the City to new and existing businesses with the goals of increasing City revenues and
employment opportunities for City residents.
1
r
B Business Retention, Expansion and Recruitment.
(1) The Contractor shall work cooperatively with the City and shall serve as an
economic development research and reference service for the City In this capacity
the Contractor shall conduct ongoing basic market research,identify target markets,
provide business retention, expansion and recruitment services aimed at existing
businesses and target markets, and participate with the City in the process of
responding to inquiries,site selection consultation,and case management,regarding
existing or new industries or other commercial ventures which seek mfonnation
concerning the facilities and resources managed by the City or which may involve
properties and/or infrastructure within the City and the Port Angeles Urban Growth
Area(UGA)
(2) The Contractor shall, upon request, provide effective industrial marketing
guidance to City staff and provide services in the development and execution of
programs aimed at better planning, utilization, promotion, and advertisement of
commnumty services, facilities, infrastructure, and property
(3) The Contractor shall maintain and enhance working relations with existing
businesses to assist them with start-up and expansion needs, technical assistance,
access to business counseling and financing resources including aid and assistance
to at-risk businesses.
(4) The Contractor shall assist the City in preparing replies to inquires received by
the City or the Contractor regarding City facilities and resources or which may
involve properties and/or infrastructure within the Port Angeles Urban Growth Area
(UGA)relative to economic development retention and growth opportunities.
(5) The Contractor shall assist the City in applying for and administering economic
development related grants,including any potential to support the development of
infrastructure.
(6) The Contractor shall assist the City in working with Clallam County to
(a) Expand City Limits into the Port Angeles UGA,
(b) Extend the Port Angeles UGA, and
(c) Extend City services and utilities into such areas
(7) The Contractor shall maintain an up-to-date community profile specific to the
Port Angeles area,which highlights demographic and development data customarily
of interest to industrial/commercial developers.
2
3
(8) The Contractor shall work with the City in the maintenance and periodic update
of the commercial and industrial property and infrastructure databases for the Port
Angeles vicinity
(9) The Contractor shall work with the City to research, identify, and implement
the addition of new development incentive programs or packages as may be
applicable to Port Angeles economic development efforts.
C Prospect Management
The Contractor will be primarily responsible for providing services in connection
with industrial and business retention,expansion and/or relocation. The Contractor
will represent the attributes for appropriate site locations within the City that meet
the prospects criteria. In such dealings, the Contractor shall participate in the
handling of prospects, in accordance with the following guidelines
(1) Contacts made directly to the Contractor or referred to Contractor by
Outside Sources.
(a) The Contractor will provide general information and other data
requested by the prospect. Within 24 hours of being contacted regarding a
prospect, the Contractor shall notify the City Manager, or his designee,by
phone and/or e-mail,regarding details of the contact.
(b) If the prospect indicates an interest in specific business locations, the
Contractor shall notify other affected parties and property owners as
appropriate, make appropriate introductions, and assist in follow-up
marketing.
(c) If the prospect requests confidentiality, the Contractor will keep the
City Manager,or his designee,fully informed without revealing the identity
of the prospect.
(2) Contacts made directly to the City
(a) When the City receives a direct contact or is managing a development
prospect and desires support from the Contractor it may request such
assistance, and Contractor will render such assistance The Contractor to
supply recruitment information and services as described in 1A and 1B
3
r
(3) Public Events, and Media
Any public events such as media conferences,ground breaking ceremonies,
and ribbon cuttings in which the Contractor is involved within the City and
or the Port Angeles UGAs will be coordinated with the City Manager or his
designee, the siting jurisdiction, and other affected partners.
D The Contractor shall provide to the City and to such persons as the City may direct,
free of additional charge,materials prepared by the Contractor
E. The Contractor shall maintain records and report to the City as follows
(1) The Contractor shall maintain accounts and records that accurately reflect the
revenues and costs for the Contractor's activities under this Contract. These
financial records, and all records related to the performance of this Contract, shall
be available for City inspection.
(2) The Contractor shall provide the City with written reports monthly, fully
describing what work has been perfonned pursuant to this Contract, and including
a current statement of revenues and costs.
(3) The Contractor shall provide the City with a written report quarterly as outlined
in Exhibit A — Reporting Performance Measures, fully describing how the
Contractor s activities have benefitted the City,the greater Port Angeles community
and the economy of Port Angeles. In addition,the Contractor's Executive Director
shall appear before the City Council at least quarterly to report on the Contractors
activities pursuant to this agreement and to answer questions
(4) The Contractor shall use its best efforts to economize on overhead expenses to
the maximum extent feasible in providing the services to be performed pursuant to
this Contract.
(5) The Contractor shall provide the City with an annual budget,including current
salaries and benefits for all employees and classifications of employees and shall
notify the City within 30 days of any increases in salaries or benefits from the
previous year
2 PERFORMANCE BY THE CITY
A. For the services to be rendered by the Contractor the City will provide,by payment
in cash, the amount of$5,000
-4-
B Payment by the City shall be due upon receipt and acceptance by the City Manager
of the Contractor's written quarterly report showing that the Contractor has
performed in accordance with Section 1 of this Agreement. The Contractor will
invoice the City for all quarterly payments.
3 TERM.
This agreement shall be for a tenn of one year, commencing on January 1, 2008
4 ASSIGNMENT
This agreement may not be assigned by either party to this agreement except by signed
amendment.
5 BREACH.
A. In the event of either party's material breach of the terms or conditions of this
Contract, the non-breaching party reserves the right to withhold payments or
services until corrective action has been taken or completed. However, the party
shall not exercise this right until they have given written notice of such material
breach to the breaching parry and ten days have passed since the receipt of such
notice. This option is in addition to and not in lieu of the parties'right to terminate
this Contract or any other right which State law offers for breach of contract.
B If either party shall materially breach any of the covenants undertaken herein or any
of the duties unposed upon it by this Contract,such material breach shall entitle the
other party to terminate this Contract,provided that the party desiring to terminate
for such cause shall give the offending party at least twenty days' written notice,
specifying the particulars wherein it is claimed that there has been a violation hereof,
and if at the end of such time, the party notified has not removed the cause of
complaint,or remedied the purported violation,then the tennmation of this Contract
shall be deemed complete
6 NON DISCRIMINATION
A. The Contractor shall conduct its business in a manner which assures fair,equal and
non-discriminatory treatment of all persons, without respect to race, creed or
national origin, and, in particular•
B The Contractor shall maintain open hiring and employment practices and will
welcome applications for employment in all positions, from qualified individuals
who are members of minorities protected by federal equal opportunity/affirmative
action requirements, and,
5-
C The Contractor shall comply with all requirements of applicable federal, state or
local laws or regulations issued pursuant thereto, relating to the establishment of
non-discriminatory requirements in hiring and employment practices and assuring
the service of all persons without discrimination as to any person's race, color,
religion, sex, Vietnam era veteran's status, disabled veteran condition,physical or
mental handicap, or national origin.
7 DISPUTE RESOLUTION
The parties agree that any dispute related to this Agreement shall first be submitted to the
City Manager and the Contractor s Executive Director,and they shall attempt to resolve that
dispute If the City Manager and Executive Director are not able to resolve that dispute,the
dispute shall next be submitted to the City Council and to the Contractor's Board of
Directors. Those entities shall attempt to resolve the dispute If they are not able to resolve
the dispute, the dispute shall be submitted to mediation. The parties shall agree on one
mediator If mediation is unable to resolve the dispute,then either party may take such legal
action as they deem appropriate. The venue of any lawsuit related to this Agreement shall
be in Clallam County, Washington.
8 INDEPENDENT CONTRACTOR STATUS
The relation created by this Contract is that of independent contracting entities. The
Contractor is not an employee of the City and is not entitled to the benefits provided by the
City to its employees. The Contractor, as an independent contractor, has the authority to
control and direct the performance of the details of the services to be provided. The
Contractor shall assume full responsibility for payment of all Federal, State,and local taxes
or contributions unposed or required, including, but not limited to, unemployment
insurance, Social Security, and income tax.
9 HOLD HARMLESS AND INSURANCE.
The Contractor shall protect, defend, save harmless, and indemnify the City, its officers,
agents,and employees from and against any and all claims,damages,losses,and expenses,
including reasonable attorney's fees, occurring, arising, or resulting from supplying work,
services, materials, or supplies in connection with the performance of this Contract. The
Contractor shall provide a Certificate of Insurance evidencing occurrence-based
Commercial General Liability insurance with limits of no less than$1,000,000 combined
single limit per occurrence,with the City shown as a named additional insured.
-6-
r
10 ENTIRE CONTRACT
The parties agree that this Contract is the complete expression of the terins hereto and any
oral representation or understanding not incorporated herein is excluded. Further, any
modification of this Contract shall be in writing and signed by both parties
IN WITNESS WHEREOF the parties hereto caused this Contract to be executed the day
and year first herein above written.
CITY OF PORT ANGELES CLALLAM COUNTY ECONOMIC
DEVELOPMENT COUNCIL
By
Gary Braun, Mayor President
ATTEST
Becky J Upton, City Cleric Vice President
APPROVED AS TO FORM.
William E. Bloor, City Attorney
GALegnl Backup\AGREEMENTS&CONTRACTS\2008 Agi vs&Contr cts\EDC 2008 Co Or ct.062008.vpd
7
Exhibit A
1 Perfonnance measures for reporting on in each monthly/quarterly/annual report:
a. Describe the results of the EDC s efforts to implement the region s economic
development strategies Please be specific.
b Identify new investments made in the long-term economic growth of the region
as part of the above strategy this month/quarter/year (Give special emphasis to
those directly related to the Port Angeles area)
c Identify new businesses/business people recruited to be EDC members this past
month/quarter/year(again, give special emphasis to those directly related to Port
Angeles), along with the following information.
1. Key personnel and contact information
ii. Business sector
ill. How you will engage them in furthering the region s economic
development strategies.
d. Identify new business startups and expansions in/near Port Angeles, along with
the following information.
1. Key personnel and contact information
ii. Business sector
ill. Number of new fobs
IV Reason they chose Port Angeles
V What are the owner's/principal s interests?
vi. How might they be further engaged in community involvement?
2 Quarterly reports will include the quarterly financials for the EDC Reports shall reflect
how the EDC is increasing corporate sponsorship and investment in the EDC while
reducing reliance on public agency funding.
8-
STRUCTURAL SITE VISIT REPORT#2
JOB NAME. International Gateway Parking Garage
JOB ADDRESS: Port Angeles, WA POGGEMEYER
PDG JOB NUMBER: 7036 DESIGN GROUP
=Gh1-'U Fit 1 G ENC-31NEE-PS
DATE: May 7,2008 TIME. 1.00 PM
PRESENT AT SITE/OFFICE:
Roland Ordona, Primo Construction Co. (superintendent)
Robert Bourdages, Poggemeyer Design Group (structural engineer)
PROJECT STATUS:
The south half of the 2nd floor slab rebar has been poured. The north half is ready for
FIV,
inspection, to be poured on Friday, May 9
ITEMS REVIEWED-
1 2"d floor PT tendons, north pour
2. 2i d floor reinforcing, north pour
OBSERVATIONS. (Photos taken)
1 The tensioned tendons at the north pour shall be cut and grout pockets are to be
grouted as soon as possible.
2. The tendons that splay out of the beam to the anchorage position sometimes are
in close proximity to the edge of the forms at the bottom of slab/beam interface.
Provide 1-1/2' clearance minimum to forms.Also place (2)#3 hairpins or(1)#4
hairpin at each location where tendons are within 2"of forms. Rebar need not be
epoxied. Hairpin length shall be at least 8"
3. It was noted that(3)distributed tendons where placed at 6' on center rather than
(2) at 4 on centers. This is an acceptable condition.
4 A dead end overlap was found at grid 0.5-K. Reposition anchor to 4 spacing and
eliminate the overlap.
5. Reference. detail 13/S7 At grid F 5-0.5 hairpins are to be positioned 3/8 the slab
thickness (2.25") away from the anchor plate.
6. At grid F 5-0.5, remove one of the#6 top reinforcing bars at the anchor to relieve
congestion and reposition on the east face of the column.
7 Other banded and distributed anchors, each end appeared adequate.
POGGEMEYER
OESGNGMUP INC.
Port Angeles International Gateway
West Parking Garage
Structural Site Visit Report
May 7 2008
Page 2
8. Of the 17 tendons in each beam, 10 are splayed into the slab. This condition is
acceptable.
9 A random check of beam PT profiles and distributed tendon profiles appeared
adequate.
10 The mid-depth rebar running N-S was found to be in place. 50%of the E-W mid-
depth rebar was not in place.
11 Beam reinforcing was found to be adequate, based on a random check.
12. PCV conduit embedded in the slab was found to negligible.
The special inspector shall review all of the deficiencies noted above and confirm that they
have been corrected prior to the pour
Report repared by
Ro Vert Bourdages, P.E.
Pr' cipal
P ggemeyer Design Group, Inc.
Page 2 j7 -
j(5/2%2008)James -ierlyW--F2esponse RFI #274 Memo.pdf Page 1
grigkt engineering Inc. Corisultin6StructuraldndC' ilEngineering
l
Memo
Date: May.2;2008 116.03R
To: Stan;Cruse
Parametriz,Inc.
2102;N Pearl Street,Suite 301
Tacoma,.`WA,98406
From: Ade J`Bright
RE: Port Angeles International Gateway
N
Stan—
As requested ,y the Port Angeles Building Inspector,this is to confirm that holdbwnS.PHD-2;PHD-5,
and HDQ-8t&c.acceptable,siibstitutes for,HD-2A,HD-;5A,and HD-,8A respectively These materials
were specified on drawing 52:09
Please.callIfte if you have any°questions.
3. B.,;l
S�CfVrfit
EKPIRES'S;'30
J�
cc: Sighed: Ade.J.Bright,PE,SE
�it3oq.f Ate?^ SI S-10e\VA q8i '58, 1 F. toG bt:w; 1Fa a0o 67s i65 ' �foQa�!+aV,tng :m.
PREPARED 4/24/08 8 55 34 INSPECTION TICKET PAGE 2
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 4/24/08
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PHONE
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
- ---- - -- - - --- ------ -- - --
PERMIT BPC 00 BUILDING PERMIT COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
BLHD 01 4/15/08 JLL BLDG FRAMING HOLD DOWNS TIME 01 00
4/15/08 DA April 14 2008 4 59 32 PM 1pangrle
TOM (CONSULTING ENGINEER) 360 915 4149
HOLD DOWNS TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30-MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
April 15 2008 4 27 32 PM jlierly
missing hold down/verify with engineer the change in type of
hold down/missing nailsin shear/ washer required on sill
plates per code/jll
BL9 01 4/15/08 JLL BLDG SHEARWALL TIME O1 00
4/15/08 DA April 14 2008 5 01 27 PM 1pangrle
TOM (CONSULTING ENGINEER) 360 915 4149
SHEARWALL NAILING TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30 MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
April 15 2008 4 27 32 PM jlierly
missing hold down/verify with engineer the change in type of
hold down/missing nailsin shear/ washer required on sill
plates per code/jll
BLHD 02 4/24/08 BLDG FRAMING HOLD DOWNS TIME O1 00
April 24 2008 8 32 29 AM 1pangrle
RANDY 461 1391
HOLD DOWNS
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
BL8 01 4/24/08 J BLDG ROOF SHEETING TIME O1 00
April 24 2008 8 36 20 AM 1pangrle
RANDY 461 1391
ROOF NAILING & HARDWARE
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
BL9 02 4/24/08 LL BLDG SHEARWALL TIME 01 00
April 24 2008 8 34 44 AM 1pangrle
RANDY 461 1391
SHEARWALL
AFTERNOON
PLEASE CALL HIM TEN MINUTES BEFORE YOU GET THERE
COMMENTS AND NOTES
l
PREPARED 4/15/08 9 40 32 INSPECTION TICKET PAGE 5
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 4/15/08
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PHONE
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
--- - -- - -- - -- -- -- - - ---- - ---
PERMIT BPC 00 BUILDING PERMIT COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
BLHD 01 4/15/08 �d�,L_ BLDG FRAMING HOLD DOWNS TIME 01 00
April 14 2008 4 59 32 PM 1pangrle
TOM (CONSULTING ENGINEER) 360 915 4149
HOLD DOWNS TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30 MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
BL9 01 4/15/08 JLL BLDG SHEARWALL TIME 01 00
April 14 2008 5 01 27 PM 1pangrle
TJI�v� TOM (CONSULTING ENGINEER) 360 915 4149
SHEARWALL NAILING TRANSIT BLDG
AFTERNOON
PLEASE CALL HIM 30 MINUTES BEFORE YOU GET THERE SO HE CAN
MEET YOU THERE
COMMENTS AND NOTES
Page 1 of 1
lAttachments can contain viruses that may harm your computer Attachments may not display correctly
Ingo Goller
From: Ade Bright[ab@brighteng.com] Sent: Thu 3/27/2008 6:28 PM
To: 'Stan Cruse' Ingo Goller
Cc:
Subject:
Attachments: D FS-17_pdf(52KB).D FS-14.odf(51KB) D FS-15.odf(784KB) D FS-16.pdf(96KB)
Stan,
Based on our discussions yesterday attached are preliminary sketches of proposed repairs at 1)the pop-outs
on the East wall under the PT beams 2) parking level slab and 3)joint between the retaining wall and the
garage wall The exterior of the wall seem to suggest that the exterior pilaster come up to the curb. I am also
considering tying both walls together by using U-shaped dowels instead of L-shape dowels which allow the
retaining wall to move North
Ingo please have the contractor provide the distance from the NE corner of the retaining wall to the catch point
along the North wall.
Please-comment on the sketches.
Ade
Ade Bright PE, SE
Bright Engineering, Inc.
1809 7th Avenue I Suite 1100 1 Seattle,WA 98101
P•206.625.3777 1 F•206.625.1851 1 www.brighteng.com
http.//mail.xltech.com/exchange/igoller/Inbox/Proj ects/Gateway/Constructlon/NE%2OReta. 9/12/2008
EAST END OF
PB3 P65 PB5A
a �
d a d BEAM SOFFI T
a
a
4
a
a a 4 a
NEAR
VERTICAL AS
POSSIBLE
CUT 1/8 MIN
DEEP GROOVE
BOUNDARY
PATCH AREA
NEAR HORIZONTAL
AS POSSIBLE
NOTES.
1 LOCATE LIMITS OF CONCRETE DEFECT AND CUT 1/8 DEEP BOUNDARY AS
SHOWN ABOVE
2 CHIP OUT TO SOUND CONCRETE WITHIN THE BOUNDARY
3 USE SIKAREPAIR SHB OR SIKATOP 123 PLUS OR APPROVED EQUAL.
4 PREPARE SURFACE AND APPLY REPAIR MORTAR ACCORDING TO
MANUFACTURERS INSTRUCTIONS
5 RE—VERIFY CONDITION AT PB7 AND PB9
REN90N5 BRIGHT ENGINEERING, INC PORT ANGELES INTERNATIONAL GATEWAY °N°S-1a
Consulting Structural & Civil Engin Bring TRANSPORTATION CENTER 16,031?
1809 7th Av ue. Suite 1100 116.03R
6 Seattle WA 98101 REPAIR ON WALL ALONG GRID 8 °A1e:3 27 06
206-625-3777 Fax 206-625-1851
BY-A. BRIGHT
�� °i"',�►. `'^"^'. �., —_ —�- °o< --kala
y.
o,r
> � K
,
21,11
b+�
£ r •t t 't`L ? if +; .. ;Y —
_ Q r
x� ,1
p r .+' a i ✓ ,SSL v C t i V£' / s
�'k l� �,,,._.��. �,.r �r j �5�'Y��x �L.r�.i,` ry r _ � '(�M��' r `� �` 'fes1VG✓ � �. ..
/
4 ix. �;,f�Ai« �t^t� � h��-�✓{ M�+-�p � W"r r+s 1�u,,. '' _ S t �•�� c\r�E/ :*l_^ � '
�e �
16 BRIGHT ENGINEERIWANC CPOR
1802 7th Avenue Suits 1100 1 1
TRANSPORTATION ®'
EXTERIOR PILASTER E
SfDEWALK
RETAINING WALL d PLAZA CURB I
Al-
I
JO/FELT
TOP OF
e t"J
d RETAINING WALL
e
° INTERIOR
m d PILASTER BELOW
d° PLAZA
d
VA
4 PLAZA CURB EXTENDED
OVER INTERIOR PILASTER
d
d
TOPJ�yEy(E WW
SECTION
4 SCALE:17/Y�1'-O' _
a
d
d TOP OF EXTERIOR PILASTER Y
• e BELOW BOY OF SIDEWALK SLAB•
it BOT OF PILASTER AT EL_�_
i� 130A,FELT
d
II SO/FELT
II '_
SPRAYED ON MCN
DENSITY FOAM
PILASTER e
d °
INTERIOR FACE •
OF WALL
ii
a
B• SDE FELT
d .70/FELT frl
II T•_g•
�j TOP Or SLAB
Ip BOT OF INTERIOR PILASTER
TO MATCH BASE SLAB.TCP Z
OF PILASTER EL 22'-0• !�
i
ELEVATION SECTION w
SCALE:7 1/2'-1'-0• SCALE:7 1/2'-I'-(r — a/
° R1GH�N6 NCNC
/ cti +»+• +� el�..ev PORT ANGELES INTERNATIONAL g+e
�+ p 6 +rw.i uF. GATEWAY TRANSPORTATION CENTER
rxT-ro 777 mm 7s-+wp REPAIR AT RETAINING WALL
PLEASE PROVIDE 8
I
+EL
FILL AREA
CUT 1/8 MIN
DEEP GROOVE
EL10 + +
EL10
Q
CJ Z
J
W
w
CL
NOTES.
1 PATCH AREA IS BOUNDED BY CJ SA WCU T GROOVE AND CONCRETE
WALLS
2 VEE ANY EXISTING CRACKS IN SLAB PREPARE SURFACE AND FILL WITH
SIKAFLEX 1A OR EQUAL ACCORDING TO MANUFACTURERS INSTRUCTIONS
3 ALLOW CRACK SEALANT TO CURE AND PREPARE SURFACE PRIOR TO
FILLING AREA WITH GROUT
4 USE SIKH TOP 122 PLUS OR APPROVED EQUAL
5 ADD PEA GRAVEL TO MIX WHERE FILL IS 1 OR MORE IN DEPTH
REM °N5 BRIGHT ENGINEERING, INC PORT ANGELES INTERNATIONAL GATEWAY EDAM3
s=n
6 COnsuBing Structural & Civil Engin ring TRANSPORTATION CENTER T Na.
1809 7th Avenue, Suite 1100 6.03R
Seattle WA 98101 REPAIR AT NE CORNER OF PARKING LEVEL 24 08206-625-3777Fax 206-625-1831 BRIGHT
Page 1 of 2
o
Ingo Goller
From: Ade Bright[ab@brighteng.com] Sent: Fri 3/7/2008 3:42 PM
To: 'Stan Cruse'
Cc: Ingo Goller• 'James Dugan' Jmahlum@cityofpa.us
Subject: RE: Beam P3
Attachments:
Stan
You are spot on The picture show the rebars were cut.
Ade Bright PE, SE
Bright Engineering, Inc.
From Stan Cruse [mailto•SCruse@parametrix.com]
Sent: Friday, March 07, 2008 3 11 PM
To: Ade Bright
Cc: 'Ingo Goller', James Dugan, Jmahlum@cityofpa us
Subject: RE Beam P3
Ade,
Another photo looking down at the P3 beam seat.
Parametrix
corOW'd#*de — uc#vd aaeitaow — 014 y a dwex"Oe
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax 253 752.9865
cell: 360 710.6425
scruse@parametdx.com
From: Stan Cruse
http.//mail.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
Page 2 of 2
Sent: Friday, March 07, 2008 3 07 PM
To- 'Ade Bright'
Cc: 'Ingo Goller', James Dugan, Jmahlum@cityofpa us
Subject: Beam P3
Ade,
The attached photo of beam P3 seat would indicate the bearing area is not the width (12 inches)of the wall,
but less.
There are no vertical bars visible as at the other beam locations.
Parametrix
ics#Wd,lea, & — ur*wd QoQutie — a �rce
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253.752.9862
fax-253 752.9865
cell: 360 710 6425
scruse@parametdx.com
http.//mail.xltech.com/exchange/igoller/Inbox/Proj ects/Gateway/Construction/NE%2ORetal 9/8/2008
grigkt Engineering Inc Consulting Structural and Civil Engineering
SITE VISIT REPORT
Project Name: Port Angeles International Gateway Project No 116 03R
Date Prepared March 19, 2008
Prepared for- KREI
Prepared By- Ade J Bright, PE, SE
At the request of the Owner and Construction Manager, I visited the site on March 11 2008 to
(a)Evaluate reported delamination on the wall along grid B directly below the PB3 and PB5
(b)Evaluate the treatment of the gap, at the expansion point 8E,between the retaining wall and the
plaza wall.
Observations
PT Beams.
PB3
Photo #1 shows an area about 36"x36' chipped out to solid concrete The-spall extends the.
width of the,beam.
There was,evidence of sandy(fine)material between the spalled concrete and sound concrete.
Only one vertical rebar was observed with 2 Z/2 cover Specified wall reinforcement on this
face is 12 on center both ways with 1 I/2 cover The surface of the bar was clean and it appears
that concrete mortar did not bond to it.
Source of water intrusion around the beam was determined to be from the chamfer, around the
wall/beam point on the exterior face of the wall. This is shown in photo#2
There is a layer of fines along and directly below the beam seat.
PB5
Photo#3 shows a significantly less spalled area and depth below the beam.
PB5A
Photo #4 shows very limited spall under the beam.
PB7 and PB7A.
Photo #5 and#6 respectively show no indication of voids or spall under the beams
+80q J S ioo 1_—,P ft k �A goin-1351 615 37' fo o6 625J851
P
� l 4
Port Angeles International Gateway Bright Engineering,Inc.
Site Visit Report March 19 2008
No spalls or void were observed at the west end of the beam.
Possible repair would consist of identifying the limits of unsound concerete, score a trapezoidal
limit of unsound concrete, and patch the void with repair mortar
Expansion Joint:
Photos #6 and#7 show the gap at the expansion point. It was discussed that a possible cosmetic
fix would be a concrete or metal covet
The NE corner is now a low point due to the previously reported settlement.
One possible repair discussed is to fill the corner with repair mortar and slope it to drain. The
contractor is to provide the location of the catch point along the retaining wall. This point would be
the westerly limit of the repair
Conclusion
Repairs for the concrete spalls, expansion point cover and slab `slope would be provided after
consultation with the,architect.
Page 2 of 6
Port Angeles International Gateway $ '-`: Bright Engineering,Inc.
Site Visit Report March 1.9 2008
Site Photos
7 TFr'
3 /" Deep
Sand - ' Y" ,
y 2 % Deep
Rebar ,
x i" Deep
Photo#1
._ 7 A t�
fi
� Ry(
.�
* 'A Chaaaaier
1. 'Ria . �"$ 3u •'t'i-
at &'B3! �j^}
Photo #2
Page 3 of 6
Port Angeles International Gateway a Bright Engineering,Inc
Site Visit Report March ]9mm
J
«SS
yJn# . ^\
` $22
\
Photo #3
P#S*
Sand \
Photo#4
Page 4o6
Port Angeles International Gateway Bright Engineering,Inc
Site Visit Report March 19 2008
�e
9
81(16 �
Pd?/
zw /
A iik �
Photo#5
'h.
�4.
7
y" PB74,
Joint
Photo #6
Page 5 of 6
Port Angeles International Gateway Bright Engineering,Inc.
Site Visit Report March.19 2008
g
NO
a
I
A, fi
5
i
5 �
Photo #7
i
Page 6 of 6
Page 1 of 2
r
y
Attachments can contain viruses that may harm your computer Attachments may not display correctly
Ingo Goller
From: Stan Cruse[SCruse@parametrix.com] Sent: Fri 3/7/2008 3:11 PM
To: Ade Bright
Cc: Ingo Goller•James Dugan,Jmahlum@cityofpa.us
Subject: RE: Beam P3
Attachments: D IMG 6622.JPG(2MB1
Ade,
Another photo looking down at the P3 beam seat.
Parametrix
ior#wd#4& — loran w-d Qaeutiocrd —
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax 253 752.9865
cell: 360 710 6425
scruse@parametrix.com
From: Stan Cruse
Sent: Friday, March 07, 2008 3 07 PM
To: 'Ade Bright'
Cc: 'Ingo Goller', James Dugan, Jmahlum@cityofpa us
Subject: Beam P3
Ade,
The attached photo of beam P3 seat would indicate the bearing area is not the width(12 inches)of the wall,but less.
There are no vertical bars visible as at the other beam locations.
Parametrix
ur#VWd Ae*A& — uu QoPutiocrd — a d'if ree
Stanley C Cruse AIA, LEED v.2 AP
http.//mall.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
Page 2 of 2
Project Manager
phone 253 752.9862
fax. 253 752.9865
cell: 360 710 6425
scruse@parametrix.com
http.//mall.xltech.com/exchange/i goller/Inbox/Projects/Gateway/Construction/NE%20Retai 9/8/2008
sF to .��� �.
ggY�"�t a (•�+�"''��.bgt��ev a.•i'k•yj c+� } `�8''�"r�-s'r
y,,. y, 'Y`4'.t,a*'.f, •fid� �,��.},*`�`�°�f,�CP"N��� t ��7~_"U�..
�°� ;. t, •Gyy � a 'Y 317 d "w" r. iWs -
, iit.: "'i;',t+ .� .4}7��.., Y �t '�' j •rj +F', a• a
i>'h�b } 'A,l' b' •;.It'''k �f�'j`l�� '' �_ y .3 �"jr^°'aC+l1''�'�"at ;h��YYt'!
ile
4`# *
`�0. �` t
^.�„_, +c i
Y��NRO,
,_•3.IZ,Y�
^ I??; G t ..' .f .P�'''•' •., y''ar� g}.0
• {D'
•9.6 ,y=a :d i;�r:'sR,, �"' .7'A "tea'' P'
, ';_
'1' �C+f- f,'�+k!�R;''{ a.�G'' �* yy .l+�tiA,.iy r'*^ "� „�Y ''�.,�tis��• �
•a"n^ f �^{ .Y 1fY?n'•t^Z`ti'.k='.tep Si° :1.3'rj'
`k+'``33,77''k .rr��3� � ,�� tL�� � ,}, �RF� � ! g�+'�;°�'"'1 '<��R��•��. :,'71�2 � DV � 't }�
•�� Rj ,a �eE` v:# � {�w � �• S,'� C'`i "}s;t}"�,�E
g���'*,,,,',',•m :a +4 Q,a hs' .F ' s •wF'f t.>•�ri 7, �',' '�r''y,1
• d- diP''?.'°1 k .�j• y._�'r,AI t;;, ,fib:+ �' i�3ak'^' ,.7a[V •}.+ °yl,4„,g5 i ,b ,/'"� 'Av. -
Yl
rr^fit".P' ^`' E .tY.+ ?iZw't,i ,`l> ,3 .'t$y.:�'t^' iP 11. �R, r �'i� �Si' Fit• i+. 4, a
At t, � sem' ryy �� ,gf.,(,hy ..k'� � lr ^� � ��M' ;"� t'?F,41 ,S• Jt r •`� '��� ��,,
it
A7' X'
r��r' � �y•r�` r q �.' k Y�-._ T,, ,�� ` ; s, fit,
s r• � � Ln.T'La�
Page 1 of 1
1zhAttachments can contain viruses that may harm your computer Attachments may not display correctly
Ingo Goller
From: Stan Cruse[SCruse@parametrix.com] Sent: Fri 3/7/2008 3:06 PM
To: Ade Bright
Cc: Ingo Goller James Dugan;Jmahlum@cityofpa.us
Subject: Beam P3
Attachments: 11 IMG 6657.JPG(2MB) F'1 IMG 6658.3PG(2MB)
Ade,
The attached photo of beam P3 seat would indicate the bearing area is not the width(12 inches)of the wall, but less.
There are no vertical bars visible as at the other beam locations.
Parametrix
icr#vw-d#4& — ic#md Qa&ew" — ma&V a d% it xwe
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax-253 752.9865
cell: 360 710.6425
scruse@parametdx.com
http.//mail.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
i
•� ,N
IRMO
Of
I'
Page 1 of 3
Attachments can contain viruses that may harm your computer Attachments may not display correctly
Ingo Goller
From: Stan Cruse [SCruse@parametrix.com] Sent: Fri 3/7/2008 10:58 AM
To: Ade Bright; Ingo Goller
Cc: James Dugan,Jmahlum@cityofpa.us
Subject: FW Delaminated Concrete
Attachments: 12l Gateway Void East Wall.ipp(lMB)
Ade and Ingo,
It would appear to me that this happened when they stressed/tensioned the beam
Parametrix
ur#Wd Elie,de — icy f Wd QaPrttiacr� — a �rce
Stanley C Cruse AIA, LEED v.2 AP
Project Manager
phone 253 752.9862
fax 253 752.9865
cell: 360 710.6425
scruse@parametrix.com
From Ingo Goller [mailto igoller@xltech.com]
Sent: Tuesday, March 04, 2008 2.04 PM
To: Stan Cruse; Robert Kugen, James Dugan
Subject: FW Delaminated Concrete
Stan,
Sorry to leave you out of the information loop This was sent out this morning
Regards,
Ingo Goller PE
Construction Manager
http.//matl.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetat 9/8/2008
Page 2 of 3
Exeltech Consulting,Inc.
116 West 8TH Street,Suite 120
Port Angeles,WA 98362
Ph.360.417.3803
Fax:360.417.3097
The attached files and/or text within this e-mail message are the property of Exeltech Consulting Inc. Reuse of
the files for any other purpose without authorization is strictly prohibited Exeltech Consulting, Inc.shall not be
held responsible for any and all losses, claims or liabilities associated with the unauthorized use interpretation
or modification of the files or text.
From: Ingo Goller
Sent: Tue 3/4/2008 9.39 AM
To- roland@primoinc.org, Patsy Busby [pb@olympus.net],Jennifer Howell, rh@olympus.net
Cc: ab@brighteng.com, Roger Horton, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us], Denis Miller; Lindsay
Murray
Subject: Delaminated Concrete
Attached picture shows the location of the delaminated concrete in the east plaza garage wall under the
bearing seat of PB 3 Please provide a repair procedure including intended materials proposed for addressing
the delaminated concrete At this time do not make any repairs until the engineer of record has reviewed the
delaminated concrete and your proposed repair procedure
Regards
Ingo Goller PE
Construction Manager
Exeltech Consulting,Inc.
116 West 8TH Street,Suite 120
http.//mail.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
Page 3 of 3
Port Angeles,WA 98362
Ph.360.417.3803
Fax:360.417.3097
The attached files and/or text within this e-mail message are the property of Exeltech Consulting Inc. Reuse of
the files for any other purpose without authorization is strictly prohibited Exeltech Consulting, Inc.shall not be
held responsible for any and all losses claims or liabilities associated with the unauthorized use interpretation
or modification of the files or text.
hop.//mall.xltech.com/exchange/l*goller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
L _
4 A
1.
T a
x '
02-2908
1 _ �
I
J
j G lUA
—4 o.
Coe,
Page 1 of 2
Ingo Goller
From: Ade Bright[ab@brighteng.com] Sent: Wed 3/5/2008 2:01 PM
To: Ingo Goller- roland@primoinc.org, pb@olympus.net; 'Jennifer Howell' rh@olympus.net
Cc: Roger Horton; Bill Alton;Jmahlum@cityofpa.us; Denis Miller- Lindsay Murray
Subject: RE: Delaminated Concrete
Attachments: ^ 2
�� 0 ✓��
Ingo > I
I have a couple of question in looking at the picture � � a
1 1 see some 3 2x around the beam. What are those for and are they embedded in the wall?
2. How deep is the delamination?Or is it scaling?Does the area have a hollow sound or crack around the
yellow mark? It may be necessary to chip out concrete around that area.
Ade Bright PE, SE
Bright Engineering, Inc.
From: Ingo Goller[mailto igoller@xltech.com]
Sent: Tuesday, March 04, 2008 9 39 AM
To: roland@primoinc.org, Patsy Busby [pb@olympus.net],Jennifer Howell, rh@olympus.net
Cc: ab@brighteng.com, Roger Horton, Bill Alton, Jim Mahlum [Jmahlum@cityofpa.us], Denis Miller; Lindsay
Murray
Subject: Delaminated Concrete
Attached picture shows the location of the delaminated concrete in the east plaza garage wall under the
bearing seat of PB 3 Please provide a repair procedure including intended materials proposed for addressing
the delaminated concrete At this time do not make any repairs until the engineer of record has reviewed the
delaminated concrete and your proposed repair procedure
Regards
Ingo Goller PE
Construction Manager
Exeltech Consulting, Inc.
116 West 8TH Street,Suite 120 �J
http.//mall.xltech.com/exchange/igoller/Inbox/Proj ects/Gateway/Construction/NE%20Retal 9/8/2008
Page 2 of 2
Port Angeles,WA 98362
Ph:360.417.3803
Fax:360.417.3097
The attached files and/or text within this e-mail message are the property of Exeltech Consulting Inc. Reuse of
the files for any other purpose without authorization is strictly prohibited Exeltech Consulting Inc shall not be
held responsible for any and all losses claims or liabilities associated with the unauthorized use interpretation
or modification of the files or text.
http.//mail.xltech.com/exchange/igoller/Inbox/Projects/Gateway/Construction/NE%2ORetai 9/8/2008
PREPARED 2/29/08 9 27 25 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR JAMES LIERLY DATE 2/29/08
ADDRESS 123 E FRONT ST SUBDIV
TENANT NBR CLALLAM TRANSIT SYSTEM
CONTRACTOR PHONE
OWNER Clallam Transit System PHONE (360) 452 1315
PARCEL 06 30 00 5 0 0043 0000
APPL NUMBER 06 00001042 COMM NEW CONST
-- --- - - - - -- -- -- ---- ------
PERMIT PL 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
PL1 01 2/29/08 LL PLUMBING UNDER SLAB TIME O1 00
February 29 2008 8 52 24 AM 1pangrle
RANDY 461 1391
UNDERGROUND PLUMBING
AFTERNOON
COMMENTS AND NOTES
CITY OF PORT ANGELES
FIRE DEPARTMENT PERMIT
e 321 East 5' Street, Port Angeles, WA 98362
Application Number 08 00000034 Date 1/16/08
Application pin number 410914
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0.000
Tenant nbr name, CLALLAM TRANSIT SYSTEM
Application type description FIRE SPRINKLER SYSTEM
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 204000
Owner Contractor -
CLALLAM TRANSIT SYSTEM KNIGHT FIRE PROTECTION INC
830 W LAURIDSEN BLVD 2509 WEST 19TH STREET
PORT ANGELES WA 98363 PORT ANGELES WA 98363
(360) 452 1315 (360) 417 0505
Structure Information 000 000 INSTALL FIRE SPRINKLER SYSTEM
Permit FIRE SPRINKLER COMM
Additional desc MAIN BLDG/PAVIL /E&W GARAGES _
Permit pin number 118786
Permit Fee 1602 65 Plan Check Fee. 1041 72
Issue Date 1/16/08 Valuation 204000
Expiration Date 7/14/08
Qty Unit Charge Per Extension
BASE FEE 1020 25
104 00 5 6000 THOU BL-100 001 500K (5 60 PER K) 582 40
4
Permit FIRE SPRINKLER COMM rr
Additional desc INSPECTION & TESTING
Permit pin number 118794' W
Permit Fee 100 00 Plan Check Fee 00
Issue Date 1/16/08 Valuation 204000
Expiration Date 7/14/08 x
Qty Unit Charge Per Extension.
BASE FEE 100, 00
Permit PLUMBING PERMIT
Additional desc BACKFLOW PROTECTION - m.
Permit pin number 119198
Permit Fee 57 00 f Plan Check Fee - 00
Issue Date 1116/08 Valuation 0
Expiration Date 7/14•/08
Qty Unit Charge Per Extension
BASE FEE 50 00
1 00 7 0000 ECH PL OTHER BACKFLOW 2 OR LESS 7 00
Special Notes and Comments
January 15 2008 1 10 46 PM 1pangrle l O -
Call Ron Becker at 417 4886 when the `
backflow device is ready for inspection
January 11 2008 2 41 31 PM kdubuc / �O
1) Project specifications dictate use of stainless steel
sprinkler heads Wax coated sprinkler heads listed for
outdoor applications may be substituted
This permit becomes null and void if work authorized is not commenced within 180 days, if work is suspended or
abandoned for a period of 180 days afer the work has commenced, or if required inspections have not been requested with
180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be
true and correct. All provisions of recognized standards, laws and ordinances governing this type of work will be compled
w whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel
th rovisions of any state or local law regulating the work specified in the pen-nit.
Signature of•Contractor or Authorized.Agent Date Signature of Owner(if Owner is builder) Date
FIRE PERMIT INSPECTION RECORD
4
Call 360-417-4655 for fire inspections Please provide a minimum 24-hour notice It is unlawful to cover insulate
or conceal any work before inspected and accepted. Post permit in a conspicuous location.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
Inspection Type Date Passed Comments
FIRE SPRINKLER
Underground piping hydrostatically tested
Underground piping flushed
Interior piping hydrostatically tested
Interior piping inspection
Dry system air tested at 40 psi (24 hours)
Sprinkler final
FIRE ALARM
Rough-in inspection
Alarm final
LP-GAS Completed by Contractor-
Underground piping inspection/pressure test Test 41
Above ground piping inspection/pressure test Piping pressure test psi
Time initiated
Tank (container) inspection Test#2
Appliance inspection Piping pressure test psi
Time initiated
LP-gas final
UNDERGROUND STORAGE TANK (UST) ABANDONMENT
Removal of flammable/combustible liquids
Tank appropriately abandoned
UST abandonment final
PERMIT OTHER(specify)
permit final
GENERAL COMMENTS
2/15/00
CITY OF PORT .ANGELES
FIRE DEPARTMENT PERMIT
e 321 East 5h Street, Port Angeles, WA 98362
r
Page 2
Application Number 08 00000034 Date 1/16/08
Application pin number 410914
Special Notes and .Comments
2) All wall mounted indicating valves may be eliminated
3) Doors to sprinkler riser rooms must be labeled
4) Fire Department Connections (FDC s) must be labeled
January 15 2008 8 32 33 AM rbecker
When you install the Fire Sprinkler System you will need to
install a double check backflow assembly If you install a
irrigation system for the plants you will also need to
install a backflow assembly for watering the plants If you
have any question call Ron Becker at 417 4886
Fee summary Charged Paid Credited Due
Permit Fee Total 1759 65 1759 65 __ 00- 00_
Plan Check Total 1041 72 1041 72 00 00
Grand Total 2801 37 2801 37 00 00
f'
>. c
t.
This permit becomes null and void if work authorized is not commenced within 180 days, if work is suspended or
abandoned for a period of 180 days afer the work has commenced,or if required inspections have not been requested with
180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be
true and correct. All provisions of recognized standards, laws and ordinances governing this type of work will be compied
with whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel
the provisions of any state or local law regulating the work specified in the permit.
Signature of Contractor or Authorized Agent Date Signature of Owner(if Owner is builder) Date
i — ~
__.......i_: :t::�.�a..�...s:..3.i_.. v.._._.... ._... �� w...�.�.._....._.., _°I�,-.... .. .cam..,
FIRE PERMIT INSPECTION RECORD
Call 360-417-4655 for fire inspections Please provide a minimum 24-hour notice It is unlawful to cover insulate
or conceal any work before inspected and accepted. Post permit in a conspicuous location.
Q4
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
fi
Inspection TypeDate Passed Comments
FIRE SPRINKLER
Underground piping hydrostatically tested
Underground piping flushed
Interior piping hydrostatically tested
Interior piping inspection
Dry system air tested at 40 psi (24 hours)
Sprinkler final . + �� KDD
FIRE ALARM
Rough-in inspection
Alarm final
LP-GAS Completed by Contractor-
Underground piping inspection/pressure test Test#1
r
Above ground piping inspection/pressure test Piping pressure test psi
Time initiated
Tank (container) inspection Test 92
Appliance inspection Piping pressure test psi
Time initiated
LP-gas final
UNDERGROUND STORAGE TANK(UST) ABANDONMENT V�
Removal of flammable/combustible liquids
Tank appropriately abandoned
UST abandonment final
PERMIT OTHER(specify)
permit final
GENERAL COMMENTS
N
2/15/00 \A <
t
PORT ANGELES FIRE DEPARTMENT
102 East Fifth Street, Port Angeles, Washington 98362
(360) 417-4650 FAX (360) 417-4659
Fire Sprinkler System Plan Review
Project Name Gateway Transportation Ctr Address 123 East Front
Installer• Knight Fire Protection Installer Telephone 417-0505
Type of System wet and dry, closed 13 ® 13 R ❑ 13 D ❑
Date 1 11.2008 PAFD Permit # 02-08
We have checked this plan and find that it conforms to the requirements of the code
1) Project specifications dictate use of stainless steel sprinkler heads. Wax-coated sprinkler
heads listed for outdoor applications may be substituted.
2) All wall-mounted indicating valves may be eliminated.
3) Doors to sprinkler riser rooms must be labeled.
4) Fire Department Connections (FDC's) must be labeled.
Additional Comments
All systems, including underground mains, shall be installed by a state licensed and certified
company Systems shall be installed per the applicable NFPA Standard.
All electrical components shall be compatible with the fire alarm system.
All underground piping must be inspected and hydrostatically tested by the Port Angeles Fire
Department PRIOR to being covered. A witnessed flush of the underground piping is required.
Before final acceptance of the system, an inspection will be conducted to ensure that the
installation complies with the applicable NFPA Standard.
❑ Contractor Reviewed by-
Building Department Date ll Ora
❑ Fire Department
0, pORTgN��` DATE. _ q'-U
ci FN
'?a
`'c�RKS ANOJ�
TO•
FIRE DEPARTMENT
❑ PLANNING DEPARTMENT
❑ PUBLIC WORKS/ENGINEERING DIVISION
❑ LIGHT DIVISION
❑ ENERGY
❑ ENGINEERING
❑ POLICE DEPARTMENT
❑ ADMINISTRATION
❑ CITY CLERK
❑ RISK MANAGEMENT
FROM. PUBLIC WORKS/BUILDING DIVISION
RE ADDRESS 2� F- FY-0"i- St
NAME/CONTACT n W t{
PHONE " L n -O-t:�D -j
PERMIT NUMBER. S-- sli r
PROJECT DESCRIPTION RM N K 1p-f-
Yp aGtr
NEW CONSTRUCTION
❑ ADDITION/ALTERNATION
COMMENTS/CONDITIONS
REVIEW/RETURN ❑ FILE
F{�rD o8-o z
0\n0Hr+,,.� BUILDING PERMIT APPLICATION Print in ink
r
�'*1•� CITY OF PORT ANGELES
- Attn Building Permit Technician Date Received
gr
For City Use Only
321 E. Fifth St. Port Angeles WA 98362
Permit#4CSS-3�{-
� (360)417-4815 fax(360)417-4711 Date Approved
Applicant or Agent0,44u- Phone r-�-oc6r-
Property Owner G I T 1 S Phone
Property Owner's Address Q'�- Sr-
Contractor/Engineer Pcox c--7 Phone �►� r
Contractor/Engineer's Address -2-SiWt-ST 191-h cr
License # Vo I wff-DaN4c_►L Expires
PROJECT ADDRESS 12 ; -�— � Ga,
Parcel Number <^ NG Q Lot Zoning
Project Type & Brief Description. ❑ Residential VIClommercial ❑ Multi-family ❑ Industrial
Check all that apply
view Construction -u�ttla� 1T J1/FL!?iNG-
❑Addition
❑ Remodel
❑ Repair
❑ Re-roof
❑ Demolition
❑ Sign ❑ wall-mounted ❑ projecting ❑ freestanding ❑ awning ❑ other
Total sign area sq ft. Maximum allowed sign area sq ft.
❑ eat System ❑ Heat pump ❑wood-burning stove ❑ gas fireplace ❑ pellet stove ❑ other
Other /$7 he VGle2
Floor Areas Existin_g(sq. ft.) Proposed(sq. ft.)
Basement @$ per sq. ft. _ $
1St Floor
2nd Floor
3rd Floor
Garage
Carport
Covered Porch
Deck
Shed
Other
TOTAL VALUATION $ 2e--4GY�D
Total footprint of structures sq ft. T Lot size sq ft. = Lot coverage %
Max. height of proposed structures ft. Occupancy group #of bedrooms
Will a lawn sprinkler system be installed? Occupant load #of full baths
Will a fire sprinkler system be installed? Construction type #of half baths
/have read and completed this application and know it to be true and correct. I am authorized to apply for this permit and
understand that it is my responsibility to determine what permits are required, an o obtain p r prior to working on
projects.
Date l Gl f Print Name `L Signature
T Forms/Building Division/Bldg Permit Appl.-2006 Code.doc
S
r-
V
�� \ \
��� ;x
ao
;��-
, �
CITY OF PORT ANGELES
FIRE DEPARTMENT PERMIT
a J
s 321 East 5`h Street, Port Angeles, WA 98362
Application Number 08 00000005 Date 1/03/08
Application pin number 466155
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0.000
Tenant nbr name INT L GATEWAY TRANS CTR
Application type description FIRE ALARM SYSTEM
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application 'valuation 16870
Owner Contractor -
CLALLAM TRANSIT SYSTEM COSCO FIRE PROTECTION IN_ C
830 LAURIDSEN BLVD 13 RUTH S PLACE
PORT ANGELES WA 98363 SEQUIM WA 98382
(360) 457 3308
Permit FIRE ALARM SYSTEM -
Additional desc MAIN BLDG & 1ST FLR GARAGE
Permit pin number 118406
Permit Fee 150 00 Plan Check Fee 00
Issue Date 1/03/08 Valuation 168.70 _
Expiration Date 7/01/08
Qty Unit Charge Per Extension
1 00 100 0000 ECH FIRE INSPECTION & TESTING 100 00
1 00 50 0000 ECH FIRE ALARM PLAN REVIEW 50 00 -- - -
Special Notes and Comments
Call for cover inspection for all sprinkler installations A
full acceptance test will be. required for, all fire alarm
systems
Fee summary Charged Paid Credited Due -
� a,
Permit Fee Total 150 00 15000 00 00 -,
Plan Check Total 00 00 00 00
Grand-Total 150 00 150 00 00 00
08
This permit becomes null and void if work authorized is not commenced within 180 days, if work is suspended or
abandoned for a period of 180 days afer the work has commenced,or if required inspections have not been requested with
180 days from the last inspection.I hereby certify that I have read and examined this application and know the same to be
true and correct. All provisions of recognized standards, laws and ordinances governing this type of work will be compled
with whether specified herein or not. The granting of this permit does not presume to give- authority to violate or cancel
the provisions of any state or local law regulating the work specified in the permit.
Signature of-Contractor or.Authorized Agent Date Signature of Owner(if Owner is builder) Date
C)
FIRE PERMIT INSPECTION RECORD Q
Call 360-417-4655 for fire inspections. Please provide a mimmum 24-hour notice It is unlawful to cover insulate
or conceal any work before inspected and accepted Post permit in a conspicuous location.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
Inspection Type Date Passed Comments
FIRE SPRINKLER
Underground piping hydrostatically tested
Underground piping flushed
Interior piping hydrostatically tested
Interior piping inspection
Dry system air tested at 40 psi (24 hours)
Sprinkler final
FIRE ALARM
tv
Rough-in inspection
Alarm final
LP-GAS Completed by Contractor-
Underground piping inspection/pressure test Test#1
75
Above ground piping inspection/pressure test Piping pressure test psi t
—1
Tank (container) inspection Time initiated Test#2
Appliance inspection Piping pressure test psi
Time initiated
LP gas final
UNDERGROUND STORAGE TANK(UST) ABANDONMENT
Removal of flammable/combustible liquids
Tank appropriately abandoned
UST abandonment final
PERMIT OTHER (specify)
permit final
GENERAL COMMENTS
2/15/00 C
08 - 05
PORT ANGELES FIRE DEPARTMENT
FIRE ALARM SYSTEM PLAN REVIEW
Project Name Gateway main bldg and garage first floor
Address 123 East Front Street
Plan# 08-01 Installer• Cosco Date 01 03.2008
We have checked this plan and find that it conforms to the requirements of our codes and
ordinances, with the following comments
1) OK to eliminate manual pull stations from fully sprinklered buildings.
2) A KNOX locking keybox is required. Contact the Fire Department at 417-4653 for
ordering and mounting information.
3) Door to room containing fire alarm control panel must be labeled on the outside with the
letters "FACP "
The following comments apply to all systems
1 All systems shall be installed per NFPA 72
2 A final field acceptance test will be conducted before final approval. The field
acceptance test will be a test of ALL system components.
3 Owner is responsible for all ongoing inspection, testing and maintenance required per the
current edition of the International Fire Code
NOTE Prior to the issuance of a Certificate of Occupancy, compliance with the above
conditions must be met.
Reviewed by- Date t 3 06
0 Building Department Copy
❑ Contractor/Owner Copy
❑ Fire Department Copy
❑ Light Department
For OFFICIAL USE ONLY
. BUILDING PERMIT - APPLICATION Du.e RL�, — 3 —o�
Permit#' 0?;—Os
Fill out COMPLETELY and in INK.Your application and site plan MUST BE Date n
COMPLETE to be accepted for review If you have any questions,call sued.
d�'ed.
Date issue
PERMITS(360)417-4815 FAX(360)417-4711
Applicant or Agent: UD#4- L7– VA r'4w Phone V<7 –`3
Owner_ A rg L Phone
Address ,��, C% �{� City• R;Icc. A NEs G-L-(--< zip 9,L''�Z���
Architect/Engineer- Phone
COntractorc'c C Ff eys-z- ICCIEtEr-T- State License#•C-cy5c oFPg3s/hc`Exp -1-OZ-o 9 Phone 'K7-3�;(>%'
Address 3 (ZirTi.�s Pl,r3 Lam' y,+-�s "City kLy� U-)K:� Zip•��5 -
PROJECT ADDRESS /a Z F-g..o v $� 1. .;I'DE_GJ_ Y'_P�OZPNING
LEGAL DESCRIPTION Lot: Block: Subdivision.
CLALLAM COUNTY PARCEL NUMBER.
Credit Card Holder Name:
Billing Address: city.
Credit Card Type VISA MC—# Exp.Date:
TYPE OF WORK. SIZE/VALUATION
❑ Residential ❑ New Constr ❑ Re-roof ❑ Stove SF @$ /SF =$
❑ Multi-family ❑ Addition ❑ Move ❑ Garage SF @$ . /SF =$
❑ Commercial ❑ Remodel P Demolition ❑ Deck SF @$ /SF =$
❑ Repair ❑ Sign -4 Other tc-ie 9 TOTAL VALUATION $ o�
BRIEF DESCRIPTION OF THE PROJECT l(J L0 0 s-F F/ter
Rsjannn
COMMERCIAL/RESIDENTIAL Occupancy Group Occupant Load. Construction Type
No.of Stories.— Lot Size. Existing Sq Ft. &Proposed Sq Ft. =TOTAL Sq Ft.
Total lot coverage %
PLANNING USE ONLY APPROVALS.
PLAN
BLDG
DPWU
ESA/Wetland(s) ❑ Yes E3No SEPA Checklist required? ❑ Yes ❑ No Other- OTHER.
VALUATION OF CONSTRUCTION In all cases,a valuation amount must be entered by the applicant. This figure will be reviewed
and may be revised by the Building Division to comply with current fee schedules. Contact the Permit Coordinator at 417-4815 for assistance.
PLAN CHECK FEE IF a plan check fee is due it must be subimtted at the tune the building pemut application and construction plans are
submitted. All other pennitfees are due at the time of permit issuance.
EXPIRATION OF PLAN REVIEW If no peiirnt is issued within 180 days of the date of application,the application will expire. The
Builduig Official can extend the time for action by the applicant up to 180 days upon written request by the applicant(see Section R105.3.2
of the International Building/Residential Code,2003) No application can be extended more than once.
1 hereby certify that 1 have read and examined this application and know the same to be true and correct. 1 am authorized to apply for this permit and
understand that it is my responsibility to determine what permits are required,not the City's, and that I must obtain such permits prior to work.
T-\RVESS\BLDG-forms-brochures\2004-Buildingpermit.�pd Applicant Date ZC>GD
r-)r7 n
TABLE OF CONTENTS
PORT ANGELES INTERNATIONAL GATEWAY T, -T
BONDED BEAM CALCULATIONS - --------
SECTION TITLE/DESCRIPTION PAGE No.
8
TABLE OF CONTENTS I
PT BEAM DATA
Beam Layout Info. I
Beam&Tendon Summary 2
PT Friction/Loss Calcs 3 to 23
PT Beam Data 24 to 25
PT Beam Anchorage Reinforcing 26 to 27
ow vCWT)ON TAKEW. MAKE CL RRECTf0NS MOTO
MACTED— REVISE AND RESUBMIT
SUBMIT SPECIFIEC ITEM M
CHECKING IS%ONLY FOR GPJEU. C�lfjr0i,MANCE NTH THE DESIGN
CONCFPT OF THE pRojvr-, ,NC' -PLIPJJCE WITH THE
INFOr,mAT&4 Givai 114 rti,- cr, FAC D:J—UV�N-3, 04i ACr'0-4
SHOWN Is SlJeJECT TO 'HF -E-xMp Or tHr :1A. 13' "'T
SpECIFjCATI0,N,S Colij, % jor. r FC;R
WH)CS SHALL BE CONFik, -,l) Al C)Rt,=,-ATED AT THE ',bZ,'jTj7.
FABRICATION PROCESSES AND [E;H"lilES OF (;04,57;',JC-J-014
COOFONA7K)N Of THiS vj0rX Vli i Tr443 OF AL-0-j HER TR4ES AND
M SATISFACTORY PERFORMANCE OF CONTRACTOR S WORK.
JN 07007 Dma-,Z�p
9AIGKT ENGINEERING INC
PAGE
0 Sill
23,159
IONAL
EXPIRES 12/26/200b]
CFFEc-riy6 E:o�)ec.67 cALGL..jLA7-1O4S
-rg4,cp i1 �wa C.oa. B�a�l _
V.2" , 1 G G 4A'
b2 24f G,3 7
32d 91• , Z 3L
(v Z_ 121 fa
13_ .3Q+� 1J= 4-8` (p-/:t z� /2p" A= 3o.Y48 f /2007�f�
.P , 7,!) =- .Z85 ps1' A = 2340
a a40
A
.234o
1.3 0'SPA" t of �-�o�} 32- i �1-1S.3 am0:064)iYG #w 1+s
G 1► !'i
0 rX/2)J = O.o 475 visa 10 /
C D E
44
1c1
5�3y 341-9 " 38 84 � �� 13!11�
(3
- (.0' D^ 4$" L14 33.L71,4X 12 = tot s
A= �x+O) + 1oIC�.s"� 2lRB/uv
p— l+ISP X23 p s 1►
11'50 782o P.,
.-T ,�
owe
kDo-dmtV 'FRICNO `t/`.,0. -s b i `r=1 1neCin ineerin �o750977thDriveSE Snohomish.WA98290
NWbsim www.11neenginecnng.cotn
Office(360)56866695
TWO BEAN EAn
C%IRDER FFFECTIVE TENDON VCF 0.OF L%19 OF W.OF JACKM V, 20 � 100 '1k" ANCHOR
MkWR FORr.E W�`18ER iK1R,Q�M tLL15MW MOLD i1�1061R,4Ib (K) � �r MLTI mLTI 10 r TYPE
P5-344 W666 I 129 19 -- 1'31 20 B° 101 In EC6-19
P5-344 444 2 18 12 �✓ -- -- 521 -• 11/40 43140 6" P/4" ECb-12
PB-344 444 3 18 12 -- -- 521 11140 4014" 6° P14° ECb-12
P5-54'6 b11 1 f 18 lei 11/4 4Ai4° 6" Pi40 EC6-19
PB-546 440 2 129 2 -- -- 521 -- 2" 8° 10" 1° ECb-p1
P5-54'6 440 3 129 0 -- 521 -- 2" $° 10" 1" EC6-12
3-5A46A 691 I 129 IS -- -- 635 -- 2° 8° I0° lya° ECb-I3
3-5A46A 333 2 a9 9 '1r .. .. 3% -- 2" B° 108 3/4" EC641
M-148 684 1 119 IS •- -- 191 -- 2" 8° 10"
3-1A48A 461 'U 129 1? •• •• 521 -- 20 be ION I' ° EC6-12
3-1A48A 456 2 a9 2 -- -- 521 -- 2" w 10" I%" EC6-12
PB-9410 684 1 129 18 -- -- 191 -- 2" 8° 100 I " EG6-19
5-11, 12013 1238 14 4 101 361, -- -- 191 -- Ilia ob 116° 0 4EC,649
°5-11 412 168 2 431 56 22 -- -- 483 -- 1/4" 3%4 Aso 0 2xEC6-12
BE BEAM ELEYAT1O1*
1/
N
Es'I N E
WW4aIZ4_M "A2I•NC3
7509 77th Drive BE
SNOBOM 31U.SIASSINGTON
98290
1Fn.EL.ONG
FRICTION / ELONGATION LpRO(3RAM.
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
PROJECT A. -PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I.D TTP TWO SPAR BEAN
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002'
MODULUS OF ELASTICITY = 28500 KSI Fu = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES = 10 07 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS = 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RESULTS
AVERAGE INITIAL TENDON STRESS = 185 36 KSI OR = 68 $ Fu
.AVERAGE FINAL TENDON .STRESS = 175 29 KSI = 38 0 KIPS OR = 64 $ Fu
TOTAL TENDON ELONGATION = 9 74 INCHES
.AVERAGE TENDON ELONGATION = 078 LNCHES PER FOOT
SPAN' SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALEHA LEFT CENTERRIGHT
` --------
1 61 67 0 32623 - 0.6910 32 00 6 50 41 50
2 63 08 0 31897 - 06750 41 50 6 50 32 00
-
TOTALS 124 75 0 64520 - 13660
PACE 1 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D TYP TWO SPAN BEAM
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH Q STRESSING Voi = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f'o = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO VIS = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN -THIS STRIP P/A = 0 265 KSI
RELATIVE HUMIDITY RH = 80 %
FORK-21AS USED (ESTIMATING PRESTRESS LOSSES, C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ec = 57 (1000 f'c )1/2
ELASTIC SHORTENING
ES = Ken (PIA) (E/Eoi )
CREEP
CR = Kcr (P/A) (E/E,
SHRINKAGE
SH = 8 2 x 10-6 KmbE(1 - 0 06(V./S).) (100 - RH)
RELAXATION
RE = (K.. - J.. (-ES + CR +- SH) C,,,
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
K.■ = O 5 FOR POST-TENSIONED MEMBERS
Ker = 1 6 FOR POST-TENSIONED MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kr. = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jr. = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cr. = 0 70 FOR LOW RELAXATION STRAND @ 69% Fu
REBUTS
ELASTIC SHORTENING = 1 13 KSI
CREEP = 3 22 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 35 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 10 07 KSI
PAGE 2 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D TYP TWO SPAN BEAM
SPAN SPAN SPAN ADD'L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
1 61 67 0 32623 - 06910 181 6 186 9 190 O
2 63 08 0 31897 - 06750 190 0 183 2 178 4
TOTAL 124 75
X - 52 895 FEET STRESS LOSS AT SEATING = 20 94 KSI
PEAK STRESS = 192 '0 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 61 67 .0 25713 202 5 197 1 190 0
2 63 08 0 25147 190 O 183 2 173 4
- PAGE 3
PINE
ENQ I wm-E:lt.I NG
7509 7.7th Drive SE
SNOHOMISH WASHINGTON
98290
3Fnmzi.c3xq4c.l
FRICTION / EL1Q"(34%'T ION P�'ROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-3/4 TWO SPAN
DA'T'A
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY = 28500 .KSI F„ = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES 15 76 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS = 25 INCH
SYSTEM BONDED STRESSED FROM LETT
LTS
AVERAGE INITIAL TENDON STRESS = 186 18 RSI OR = 68 % Fu
AVERAGE FINAL TENDON STRESS = 170 42 RSI = 37 O .KIPS OR = 63 % Fu
TOTAL TENDON ELONGATION = 9 78 INCHES
AVERAGE TENDON ELONGATION = 078 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBERLENGTH ALPHAS ALPHA LEFT CEN'T'ER RIGHT
1 61 67 0 28314 - 047.39 24 00 6 50 41 50
2 63 08 0 31897 - 06750 41 50 6 50 32 00
TOTALS 124 75 0 60211 - 11489
PAGE 1 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-3/4 TWO SPAN
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH 9 STRESSING Voi = 4 000 KSI
CONCRETE STRENGTH (28 DAX) V c = 5 000 K8I
T-BEAM VOLUME TO SURFACE RATIO V/S = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
-
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE HUMIDITY RH = 60 %
FORMULAS USED (EST.IMATING PRESTRESS LOSSES, C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Er = 57 (1000 f-v )1/2
ELASTIC SHORTENING
ES = Kea (P/A) (E/Eci )
CREEP
CR = Kar (P/A) (E/Ec )
SHRINKAGE
SH = 8 2 x 10-5 KshE(1 - 0 06(V/S)) (100 - RH)
RELAXATION
RE = (Kr. - Jr. (ES + CR + SH) Cr.
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
Ke. = 0 5 FOR POST-TENSIONED -MEMBERS
Kcr = 1 6 FOR POST-TENSIONED MEMBERS
K.h = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kr. = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jr. = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cr. = 0 72 FOR LOW RELAXATION STRAND @ 69% Fu
RESULTS
ELASTIC SHORTENING = 2 62 KSI
CREEP = 7 .51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 23 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 76 RSI
PAGE 2
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D_ = PB-314 TWO SPAN
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
1 61 67 0 28314 - 04739 183 2 187V3 190 8
2 63 08 0 31897 -.06750 190 8 184 O 179 2
TOTAL 124 75
X = 53 341 FEET STRESS LOSS AT SEATING = 19 27 KSI
PEAK STRESS = 192 9 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 61 67 O 23575 202 5 198 4 190 8
2 63 08 0_25147 190 8 184 O 179 2
PAGE 3 -
8
F I N E
ENC3.�1�EERI N.+�
75.09 77th Drive SE
SNOHOM•ISH WASHINGTON
98290
Y•'RELC3NG
3E`R I CT Z ULY PROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
PROJECT PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I D PB-5/6 TWO SPAN
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002:
MODULUS OF ELASTICITY = 285Q0 KSI Fu = 270 KSI a
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM! LOSSES = 15 65 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RICOULTS
AVERAGE INITIAL TENDON STRESS = 184 75 KSI OR = 68 % Fu
AVERAGE FINAL TENDON STRESS = 169.11 KS1 = 36 7 KIPS OR = 62 % Fu
TOTAL TENDON ELONGATION = 9 70 INCHES
AVERAGE TENDON ELONGATION = 078 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 61 67 0 35847 - 08516 38^00` --------
`
650 41 50
2 63 08 0 31897 - 06750 41 50 6 50 32 00
TOTALS 124 75 0 67744 - 15266
PAGE 1
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-5/6 TWO SPAN
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @- STRESSING f 'a; = 4 000 KSI
CONCRETE STRENGTH (28 DAY) Vo = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO V/S = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE- HUMIDITY RH = 80 %
FORMULAS USED (ESTIMATING PRESTRESS. LOSSES, C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ec = 57 (1000 f'a )1/2
ELASTIC SHORTENING
ES = Res (P/A) (E/Eoi )
CREEP
CR = Ker (P/A) (E/Eo )
SHRINKAGE
SH = 8 2 x 10-6 K$hE(1 - 0 06(V/S) ) (100 - RH)
RELAXATION
RE = (Kra - Jte (ES + CR + SH) Cra
TOTAL LONG. TERM LOSSES
LTL = ES + CR + SH + RE
FORKULA CONSTANTS
K•■ 0 5 FOR P05T-TENSIONED MEMBERS
Kor = 1 6 FOR POST-TENSIONED .MEMBERS
Kai = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kc• = 5 0 KST FOR 270 GRADE LOW RELAXATION STRAND
he = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cc = 0 6.9 FOR LOW RELAXATION STRAND @ 68% Fu
RESOLTS
ELASTIC SHORTENING = 2 62 KSI
CREEP = 7 51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 12 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 65 KSI
PAGE 2 -
10
PROJECT PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I D PB-5/6 TWO SPAN
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
Y
1 61 67 0 35847 - 08516 180 3 1866 189-4
2 63 08 O 31897 - 06750 189 4 182 6 177 8
TOTAL 124 75
X = 52 505 FEET STRESS LASS AT SEATING - 22 19 KSI
PEAK STRESS = 191 4 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
-
1 61 67 0 2733.1 202-5 196 2 189 4
2 63 08 0 25147 189 4 182 6 177' 8
- PAGE 3 -
it Z NE
ENCS=NEEFC,ING
7509 77th Drive SE
SNOHOMISH WASHINGTON
98290
3'RE L C?NG
LP`R I CT I ON' / ELC>NGPkT I QN POEtC?GRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
PROJECT PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I D PB--3/4 ADDED TENDONS
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = d'0012
MODULUS OF ELASTICITY = .28500 KSI Fu = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES = 15 75 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM UNBONDED STRESSED FROM LEFT
ROOM
AVERAGE INITIAL TENDON STRESS = 186 09 RSI OR = 68 % Fu
AVERAGE FINAL TENDON STRESS = 170 34 ASI = 37 O KIPS OR = 63 % Fu
TOTAL TENDON ELONGATION = 5 77 INCHES
AVERAGE TENDON ELONGATION = 078 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
-----
1 61 67 0 35847 - 08516 3800 6 50 41 50
2 12 00 0 26351 0 00000 41 50 *CANT* 32 00
TOTALS 73 67 0 62198 - 08516
PAGE 1 -
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-3/4 ADDED TENDONS
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING t 'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) f 'c = 5 000 KSI
T-BEAM. VOLUME TO SURFACE RATIO V'/S = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE HUMIDITY RH = 80 $
FORMULAS USED (ESTIMATING PRESTRESS LOSSES, C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
E. = 57 (1000 f'r )1/2
ELASTIC SHORTENING
ES = Kee (P/A) (E/E.
CREEP
CR = Kar (P/A) (E/Ec ) .
SHRINKAGE
SH = 8 2 x 10-6 Koh E(1 - 0 06(V/S) ) (100 - RH)
RELAXATION
RE = (K,, - Jr a (ES + CR + SH) Cr e
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
Ke■ = 0 5 FOR POST-TENSIONED MEMBERS,
Kar = 1 6 FOR POST-TENSIONED MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kre = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
he = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cre = 0 72 FOR LOW RELAXATION STRAND @ 69% Pu
RESULTS
ELASTIC SHORTENING n 2 62 KSI
CREEP = 7 .51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 22 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 75 KSI
PAGE 2 -
l3
'
PROJECT PORT ANGLES - TRANS CENTER 12-04-2007
STRIP I D PS-314 ADDED TENDONS
SPAN SPAN SPAN ADD L. STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
-
1 61_67 0 35847 -_08516 180 3 166 6 189 4
2 12 00 026351 O 00000 189 4 184 2 179 2
TOTAL 73 67
X = 52 505 FEET STRESS LOSS AT SEATING = 22 19 KSI
PEAK STRESS = 191 4 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
'NUMBER LENGTH ALPHA LEFT CENTER RIGHT
-
1 61 67 O 27331 202 5 1962 189' 4
2 12 00 0 26351 189 4 184 2 179 2
PAGE 3 -
t4-
E$' ILYIH:
L1V+ 1"mER I MC3
7509 77th Drive SE
SNOHOMISH WASHINGTON
98290
F`RELONG
3EPR Z CT I C W / 3H:L0NGAT I ON PRC C3aZ: M
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PH-5/6 ADDED TENDON
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0.`OO2
MODULUS OF ELASTICITY - 28500 KSI Fu = 270 KSI
INITIAL JACKING STRESS = 75 % Fu = 203 KSI STRAND: AREA = 0 217 IN "2
LONG TERM LOSSES = 15 86 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RESULTS
AVERAGE INITIAL TENDON STRESS = 187 54 KSI OR = 69 % F„
AVERAGE FINAL TENDON STRESS = 171 "68 KSI = 37 3 KIPS OR = 63 % Fu
TOTAL TENDON ELONGATION = 5 82 INCHES
AVERAGE TENDON ELONGATION = 079 INCITES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 61 67 0 28314 - 04739 24-00 6 50 41 50
2 12 00 0 26351 0 00000 41 50 *CANT'* 32 00
TOTALS 73 67 0 54664 - 04739
PAGE 1 -
f5
12-04-2007
PROJECT PORT ANGLES — TRANS CENTER
STRIP I D PB-5/6 ADDED TENDON
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) V c = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO V/S = 6 14 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 664 KSI
RELATIVE HUMIDITY RH = 80 %
FORM LAS USED (ESTIMATING PRESTRESS LOSSES C I 5/79)
MODULUS OF ELASTICITY OF CONCRETE
Ec = 57 (1000 £+c )1i2
ELASTIC SHORTENING
ES = Ka,a (P/A) (E/Eci )
CREEP
CR = Kcr (,P/A) (E/E. )
SHRINKAGE
SH = 8 2 a 10-6 KmhE(1 - 0 06(V/S)) (100 - RH)
RELAXATION
RE = (Kra - Jr, (ES + CR + SH) Cre
TOTAL LONG TERM LOSSES
LTL = ES + CR + SH + RE
FORMiJLA CONSTANTS
Keo = 0 5 FOR POST-TENSIONED MEMBERS
Kcr = 1 6 FOR POST-TENSIONED MEMBERS
Keh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kra = 5 0 KSI FOR 270 GRADE LOW RELAXA'T'ION STRAND
Jra = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cra = 0 74 FOR LOW RELAXATION STRAND @ 69% Fu
RESULTS
ELASTIC SHORTENING = 2 62 KSI
CREEP = 7 51 KSI
SHRINKAGE = 2 39 KSI
RELAXATION = 3 34 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 15 86 KSI
PAGE 2 -
!6
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I_D PB-5/6 ADDED TENDON
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
1 61 67 0 28314 - 04739 183 2 187 3 190 8
2 12 00 O 26351 O 00000 190 H 185 6 184 6
TOTAL 73 67
X = 53 341 FEET STRESS LOSS AT 5EATING = 19 27 KSI
PEAK STRESS = 192 9 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 61 67 0 23575 202 5 198 4 190 8
2 12 00 0 26351 190 8 185 6 180 6
- PAGE 3 -
PINE
MM(3 =NEER I NCA
7509 77th Drive SE
SNOHOKISH WASHINGTON
98290
FREL.ONG
IrR I CT I ON / ELClNC3ZL-r Z ON PROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-11/12/13 ADDED TENDONS
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K =- 0.002
MODULUS OF ELASTICITY = 28500 KSI Fu = 270 KSI `•i
INITIAL JACKING STRESS - 75 % F„ = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES = 16 74 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM BONDED STRESSED FROM LEFT
RESULTS
AVERAGE INITIAL TENDON STRESS = 177 60 KSI OR = 65 % Fu
AVERAGE FINAL TENDON STRESS = 160 86 K81 =' 34 9 KIPS' OR = 59 % Fu
TOTAL TENDON ELONGATION = 3 89 INCHES
AVERAGE •TENDON ,ELONGATION - 075 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 5 25 0 00000 0 00000 28 00 *CANT* 28 00
2 36 75 0 50923 0 00000 28 00 6 50 41 50
3 10 00 0 77354 0 00000 41 50 *CANT* 18 00
TOTALS 52 00 1 28277 0 00000
- PAGE 1 -
12-04-2007
PROJECT PORT ANGLES — TRANS CENTER
STRIP I D PB-11/12/13 ADDED TENDONS
LONG TERM LOSS CALCULATIONS
DATA-
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f 'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) Vc = 5 000 KSI
T—BEAM VOLUME TO SURFACE RATIO V/S = %11 26 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 850 KSI
RELATIVE HUMIDITY RE = 80 %
FORMULAS USED (ESTIMATING PRESTRESS LOSSES C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ec = 57 (1000 f'c )112
ELASTIC SHORTENING
ES - Kea (P/'A) (E/Eci }
CREEP
CR = Kor (P/A) (E/Ee ) .
SHRINKAGE
SH = 8 2 x 10`6 KohE(1 — 0 06(V/S) ) (100 — RH)
RELAXATION
RE = (Kra — Jra ('ES + CR + SA') Cre
TOTAL LONG TERM. LOSSES
LTL = ES + CR + SH + RE
FORMULA CONSTANTS
Kee = 0 5 FOR POST—TENSIONED MEMBERS
Kor = 1 6 FOR POST—TENSIONED MEMBERS
Koh = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kr. = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jre = 0 04 FOR 270 GRADE LOW RELAXATION STRAND
Cre = 0 57 FOR LOW RELAXATION STRAND @ 66% Fu
RESULTS
ELASTIC SHORTENING = 3 36 'KSI
CREEP = 9 62 KSI
SHRINKAGE = 1 23 KSI
RELAXATION = 2 54 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 16 74 KSI
— PAGE 2 —
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-11/12/13 ADDED TENDONS
SPAN SPAN SPAN ADD L STRESS AFTER SEATING
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RIGHT
1 5 25 0 00000 0 00000 172 Ft 373 0 173 0
2 36 75 O 50923 0 00000 17"1 0 IRI 5 181 4
3 10 00 O 77354 0 00000 181 4 157 7 1FS
TOTAL 52 00
X = 32 736 FEET STRESS LOSS AT SEATING = 29 57 KSI
PEAK STRESS = 187 7 KSI
SPAN SPAN SPAN STRESS BEFORE SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 5 25 0 00000 202 5 202 4 202 3
2 36 75 0 50923 202 3 193 9 1814
3 10 00 0 77354 181 4 167 7 155 1
- PAGE 3 -
'20
FIX rgH:
EN4c.3I LYELxz Z mc;
7.509 77th Drive SE
SNOHOMI SH WASHINGTON.
98290
FRE L.CNG
F'1Z = CT I'OiV / ELOMC3AT I ON PROGRAM
POST TENSIONING LOSSES AND THEORETICAL ELONGATION CALCULATIONS
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-11/12/13
DATA
CURVATURE COEFFICIENT U = 2 WOBBLE COEFFICIENT K = 0002
MODULUS OF ELASTICITY = 28500 XSI Fu = 270 KSI
INITIAL JACKING STRESS - 75 % Fu = 203 KSI STRAND AREA = 0 217 IN "2
LONG TERM LOSSES = 16 55 KSI (SEE PAGE 2 FOR CALCULATIONS)
SEATING LOSS - 25 INCH
SYSTEM BONDED TWO END STRESSING (LEFT SIDE STRESSED FIRST)
RESDLTS
AVERAGE INITIAL TENDON STRESS = 174 87 KSI OR = 64 % Fu
AVERAGE FINAL TENDON STRESS = 158 33 KSI = 34 4 ;KITS OR = 58 % Fu
TOTAL TENDON ELONGATION = 7 66 INCHES
AVERAGE TENDON ELONGATION = 074 INCHES PER FOOT
SPAN SPAN SPAN ADD'L PROFILES
NUMBER LENGTH ALPHAS ALPHA LEFT CENTER RIGHT
1 5 25 0 00000 0 00000 28 00 *CANT* 28 00
2 36 75 0 50923 0 00000 28 00 6 50 41 50
3 33 67 0 68619 0 00000 41 50 6 50 41 50
4 24 42 0 76713 0 00000 41 50 6 50 28 50
5 3 92 0 00000 0 00000 28 50 **ANT* 28 50
TOTALS 104 00 1 96255 0 00000
PAGE 1 -
1.2-04-2007
PROJECT PORT ANGLES — TRANS CENTER
STRIP I D PB-11/12/13
LONG TERM LOSS CALCULATIONS
DATA
MODULUS OF ELASTICITY E = 28500 KSI
CONCRETE STRENGTH @ STRESSING f 'ci = 4 000 KSI
CONCRETE STRENGTH (28 DAY) Cc = 5 000 KSI
T-BEAM VOLUME TO SURFACE RATIO V/S = X511 26 INCHES
TIME BETWEEN MOIST CURE & STRESSING = 5 DAYS
P/A IN THIS STRIP P/A = 0 850 KSI
RELATIVE HUMIDITY RH = 80 %
FORMULAS USED (ESTIMATING PRESTRESS LOSSES C I 6/79)
MODULUS OF ELASTICITY OF CONCRETE
Ea = 57 (1000 f'c )ZI2
ELASTIC SHORTENING
ES = K.. (P/A) (E/Eci )
CREEP
CR = Ker (P/A) (E/Ec )
SHRINKAGE
SH = 8 2 x 10- 6 KahE(1 - 0 06(V/S) ) (100 — RH)
RELAXATION
RE = (Kr a — J,, (ES + CR + SH) Cr e
TOTAL LONG TERM LOSSES
LTL "= ES + CR + SH + RE
ORMULA CON TANTS
Kee = 0 5 FOR POST—TENSIONED MEMBERS
Kor = 1 6 FOR POST—TENSIONED MEMBERS
Kmb = 0 81 FOR A 5 DAY DELAY BETWEEN MOIST CURE AND STRESSING
Kr = 5 0 KSI FOR 270 GRADE LOW RELAXATION STRAND
Jre = 0 04 FOR 270 GRADE LOW RELAXA'T'ION STRAND
Cre = 0 53 FOR .LOW RELAXATION STRAND @ 65% Fu
RESULTS
ELASTIC SHORTENING = 3 36 KSI
CREEP = 9 62 KSI
SHRINKAGE = 1 23 KSI
RELAXATION = 2 35 KSI
----------------------------------
TOTAL LONG TERM LOSSES = 16 55 KSI
PAGE 2 —
2—
12-04-2007
PROJECT PORT ANGLES - TRANS CENTER
STRIP I D PB-11/12/13
SPAN SPAN SPAN ADD L STRESS AF i i.'= "r,W- Y SEA-TNS
NUMBER LENGTH ALPHAS ALPHAS LEFT CENTER RICHT
-
1 5 25 0 00000 O 00000 172 8 1?29 173_0
2 36 75 0 50923 0 00000 173 0 18-1 S 181 4
3 33 67 0 68619 0 00000 181 4 168 8 172 7
4 24 42 0 76713 0 00000 172 7 172 1 159 9
5 3 92 0 00000 0 00000 159 4 159 >a 159 7
TOTAL 104 00
X LEFT = 32 736 FEET X RIGHT = 22 456 FEET
XC = 64 55 FEET
STRESS LOSS 6 SEATING LEFT = 29 67 KSI RIGHT = 42 77 KSI s
STRESS AT XC = 164 79 KSI
PEAK STRESS = 187 7 KSI
SPAN SPAN SPAN STRESS AFTER IST PULL & SEATING
NUMBER LENGTH ALPHA LEFT CENTER RIGHT
1 5 25 0 00000 172_8 172— 173 0
2 36 75 O 50923 173 0 181 181 4
3 33 67 0 6861q 18] 4 168 8 157 0
4 24 42 0 76713 157 0 142 6 1.14 1.
S 3 92 O 00000 134 1 134 0 133 a
- PAGE 3
23
Bunn Date 313-66.m BONDED BEAMS Q ill Lad 1000 PM
PB 7A031.
7 300
8 7 a a 4 3 2 1 RMIRD 1. Z 4 5 8 B Pmft CGS
• e
11 0.678 32. 1 las 1LVID am 6.20 &W 7.18 933 12M 17A4 23.59- 31.11 381W 41M 3510 41.9 41.5
13M 15D 1.50 1.50 1.80 1 Im COD 1 1.50 1 1.95 Im 1 1.50
z 0.500 o" omo 0.500- 0800 a" 0,500 0.500 0:500 "DD OMD 0.500 0.500 o,5D0 0800 0.500 -0.600
24.0Z 1 18346 14,450 10.880 8.090 6.090 4.900 4. 3.180 7.230 10.950 15.440 21.880 Z9.110 rO.T70-F 40.5001 41.500
1 2 0. 41 :1 .23 20 .1 32.0 32
1: 1. 1. J.
1.50
X -0.900 0.500 0.500 0.500 0.600 0.800 0.500 0.600 0.500 0.500 a 500 0.800 0,600 0.600 0.500 0.500 0.000
4D.500 38.T70 29-110 21.8010.115O 7.230 5,18D4.900 4.90 8.090 8.090 10.86014.458 18.840 24.0201 30.500 32.000
P811
4.10
SPWW PSnNe e 1 a 3 4 2 1 plum 1 2 3 4 5 8 7 a Prcf% F42td COS
ec
1 0.8 1 41.5
2A 2M 2.05 2 2 2• 2.115
z -0:420 0.420 0420 0.420 O.420 0.42D. 0.420 MAW 0.420 0.420 0.420.
-2 -2.0 1 9.8 4. 5.780 11.000 19. .030 .6 2'. 2050 2 41.500
1 2 1 b.M 20, 17.70 .0 41.3 418
-LD6 LOS 2, IM 2 2
z -0.420 0.420 o.42D.-. '0.430 0.4200.420 0420 0.4ZD 0.430 0.420 -0.420
8. 1 1 10. .830 4.130 4. 11. 1 .7B 32.03G 38.570 -2.050 - .2.050 41.
PS 12&13
4.10
4 .3 2 1 PSM 1 2 a 4 5 6 7 8 COS
e b a
4lrD 35.D 41.3 41.5
--2-05 Z05 22V ;. L
z wao 0.750- 0.760 0.750 0.760 0.760 0,750 0.75u 0.750 0.780 -0.76D ao
-2.050 -2.050 40.200 31. DD 19.45D 10.700 .450 10,700 19.450 31.100 40. -2.053 -2.050 41.
2 AIM 41 SO M.0 41.5028.5
Dud 2A 2 2 2AS 2.09 LOS
z -0.780 D.760 0.750 0.730 0.750 0.750 -0.760
O .0 -2.050 -2.0 140 8.580 3.700 6.7110 16.9M 27.200 -2 -2.050 -2 28500
P812 CANT.
3.00
8 7 8 3 2 1 Pr=8 1 2 s 4 5 8 T COS
■ 0
iz
1 L 41.5
1.50 1 1. 1.50 1113 133 IN 1 X30 1.9-1. 00 1°500 -1. 1. . 1. -0. •U 1.500. -1.500 1.500 -1.500 -1,500 -i. 1. 1.500 1. 00-1.5 41800
01. 1. 1 1 1. 1. 1.50 1.50
-OJW 0.600 0.600 0.500
t.sw 1.600 1.500 1. 4. 40.6W - 35.240 26,440 16.0001.5W 1. -1. •1.500 1.5D0 .1.500 1,5001 1.500 0.000
1214f1007 FINE ENO04EEWN0 2
4
Seem Dale 3-13-MAS BONDED SEAJAB 01st Lard 1000 PM
RECTO CALM 0 RFQ'D SCAN Pro18e CUT 0 K
Am ©uo Beam ID CommerAr. F,0. F, 0/Ten Tendons STRANDS 0 B PIA Lanpl A B C I 0 a b c LENGTH (L+4) EC6 t2 EC6
9.86 7.90 PB 3-0 CC8-19 $12 371 19.0 0.87 17 4.00 2.50 0262 124,85 0,00 81.67 63,08 0.00 32.000 6.5 41.500 128.11 2191 1
6.86 4.70 ADD 2XSC&12 616 36.5 12.0 1., 23 4.50 2.50 0.610 74.06 0.90 81.87 12.00 0.00 32000 6.5 41.500 76.1 1795 2
9.88 T.9Q PB 5 6 2XEC6 t2 950 37.1 f2.0 2.13 ZB 4,50 2.60 0.406 121.8 0.00 61.fi7 63-08 0.00 32.000 8.6 41.500 128,9 3350 2
5M 4.70 ADD EC6 70 475 36.3 19.0 0.68 14 4.50 2.50 0.809 74.98 0.00 61.67 12.00 0.00 32.000 6.5 41.500 76.1 1093 1
9M 7.90 ?B SMIA EC812J19 950 371 19.0 1.33 26 4.50 2.50 0.406 124,85 0.00 61.67 83.08 0:00 32.000 6.5 41.5DO 125,9 3350 1 1
9A8 7.90 PB 7-0 ECO-10 610.0 37,1 19.0 0.87 17 4.60 2.50 0,201 124.85 0.00 61.67 83.08 0.00 32 000 6.5 41.500 125.9 2191 1
D9.887.90 PB 7A-SA ZXEC6.12 BSOA 311 12.0 1.91 23 4,60 2.SD 0.383 124.88 0.00 61.67 83.08 0.00 32.000 6.5 41.500 128.9 2961 2
R.88 7.90 PB 8-10 ECS-19 550.0 37.1 19.0 0.79 16 4.50 2.50 0.239 124.86 0.00 BS.67 83.08 O.OQ 32.000 0.5 41.500 128,9 2082 1
fi6B ,34 ?B 11-13 2xEC619 1150.0 371 19.0 1 63 31 4.00 5.00 0.523 104.25 42 OD 33.fi7 24.62 3.9Z 41,500 3.5 41.500 1082 3358 4
0.68 5.34 ADD 2xE06-12 720,0 .$6.5 12.0 1.64 20 4.00 5.00 0.850 52.04 4.75 36.75 10-DO 0.00 28.000 30. 41.500 56.0 1121 2
213 23,471 9 9
PB 718
IL 4.1
Sw 81.67 B B 1 1 4- 8 CGS
c
a
1 l 021 12.W WV 23.3 31.110 41.1 41.5
Duct 2
Z 0000 0.878 0.878 0.578 0876 0676 CAM 0.575 .0.876 0.878 0976 0975 0.875 0.875 0.575 08% -0,875
O, 29 1 .91 1 1 T.1 BS 1 9 S 3. 4. 8, 14.515 20. B 846 41a500
32
2.05 2.95 Z.., ZA &- - 05
Z -0978 0.878 OA75 0.670. 0.876 -0.678 0.875 0975 OATS DA" ae76 aS78 0.875 0.578 0878 0876 0.000
4Q.3 8.1 1 .61 9: 4. 3.9 .1 .1 13,531 1 .9t 23.095 32.000
PB 314
* 4AC
proM5 B 4 1 1 4 6 8 CGS
C
s738 1 41.5
1Dud 1 2 05 iLw
2 0.760 0.750 0.750 0.760 0.750 0.768 0.760 0.750- 0.760 -0.750 0.760 0.760 0.750 0.780 0.750 0.760 -0.750
B, 21 1 .1 t S0: 6.180 3.970 3. .38D 8.430 1 . 20:790 2 ,31 .970 41.
-1 2 0,750 31:5 MM SM 2422 16.60 U-35 10.93 455" GINO ILSO 7.W 8.40 1108 14A7 10.95 24A 30.01 MA 25.5 A 32
Z05 2.05 z 2 y L05
Z .0.75D 0.750 0.750 0.760 .0:780 .0.750 . .0.760 0.756. .0.750 0.750 0.750 ,0.750 0,760 0.750 0.79D 0.780 0.000
v. 36.7007. 21.420 18. 11.860 8.130" 5.670 4,190 3.700 4.200 5.690 5.100'11-670 18.1 27,210 29.950 32.DDO
PB SAMA
4.10
GPM* I Prom MV-0 6 4 3 2 1 Prom 1 z 3 5 8 5 Plaine RWd COS
G
8
.00 13. 9B 9 41.5
L05 ZC5 US 2. 2 2 2
Z 0,750 0.750 0.750 .0.780 0.760 0.780. 0.750 0'760 0.750 0,780 0.750 0.750 0.750 0.750 Or 0.780 -0.750
17.200 14. 1 .290' 8.9 4 . DO 4. 9.850 14. 20.790 28,31 0 40.200 41.
1 3,78 IM 931 0.85 BAD 32
0.7w Mao ina, Z05 2M
2A US Los 20 Mo 2 -0.760 WED 0.750 0.750 0.750 0.760 0:780 0.7ab 0.750 0.780- o.760 0.760 0.750 0,780 0.750 0.760 0.000
34.200 .20.010 15. 10.9 S. 1 4. 3 4, .690 .1 11.8 0 18.150 10 29. 32.0
90
124/2007 FINE'ENGINEERING 1
1204/2007
BURSTING BAR 9:50 PM
#Strands/ 9 Vert Hoa. CGS VERTICAL BARS HORMNTAL BARS Ast= 031 #Les 4
Tendon Tendons Fu Psu da da D B x dsp TeuasT I AsT I dsp TauRST I AsT daursr d&uRsT Spacing S aci
ng
PS 7/8 Vert Hort. Vert Hort.
ISE 17 1 70 956.2 12:250 12 250 48 30 32 15 32 147.5 2.89 30 141.4 2.77 16.00 15.00 5.9 6.7
1 DE 17 1 270 956.2 15.000 15.000 48 30 E2 15 32 127.0 2.49 30 119,5 2.34 16.00 15.00 8,0 7.9
PB-5A/6A
ISE 19 1 270 1068.7 12.250 12,250 48 30 35.5 15 25 136.3 2.67 30 158.1 3.10 12.50 15.005.8 6.0
1&2 SE 6 1 '0 1574.9 26.000 12.250 48 30 30.5 .5 35 101.2 1.99 30 233.0 4.57 17.50 15,00 10.9 4.1
1,2 DE 1 28 1 170 1574.9 14.625 21.000 48 30 32 15 32 213,81 4.191 30 118:1 2.321 16.0 15.001 4.71 8.01
#Strands/ sf Vert Hoa CGS VERTICAL BARS HORIZONTAL BARS Ast= 0.2 N Legs 4
Tendon Tendons Fu Psu 'da da D- B y x dsp Tnuasr I AsT I dsp TsuRST Asr dBuw deuwr Spacing Spacin
Vert Hort. Vert Horz.
PS-7/8
15E 17 1 270 956,2 12.250 _2.250 48 30 32 15 32 147.5 2.69 30 141.4 2.77 16.00 25.00 4.4 4.3
1 DE 17 1 270 956,2 15.000 15.000 48 30 32 15 32 127,0 Z.49 30 119.5 2.34 16.00 15,00 5.1 5.1
PB-5A/6A
1 SE 19 1 270 1068.7 12.250 12.250 48 30 35.5 15 25 136.31 2.671 30 158.11 3 101 12.501 15,00 3;71 3.91
1&2 SE 28 1 270 1574.9 26.0+0'0 .250 48 30 30.5 15 35 101.2 1.991 30 233.0 4.57 17,50 15.00 71 2.61
1,2 DE 1 28 1 270 1574.9 14.625 21.000 48 30 32 15 32 213,81 4.191 30 118.11 2 321 16.001 15.001 3.11 5.21
#Strands/ # F Vert Hoa CGS VERTICAL BARS HORIZONTAL BARS Ast= 0.31 #Legs 4
Tendon Tendons Fu Psu I da da D B y x dsp Tsmsr Asr dsp Teuw I Ait deuRsr dww Spacing Spacing
Vert Hoa. Vern Hort.
PB-3/4
15E 18 1 270 iD12:4 12.250 12.250' 48 30 38.00 15.00 20 98.1 i.92 30 149.$ 2:94 10.00 15.00 5.4 6.3
1&2 SE 42 1 270 2362,3 44.000 18,000 48 30 29.7' 15.00 36,46 201.8 3.96, 30 23&2 4163 18.23 15,00 5.7 4.D
1,2&35E 18 3. 270 3037.3 24,000 24.000 48 30 32,00 15'MO 32 189.8 3.72 30 1SL9 2.99 16.00 15.00 5.3 6.2
1 DE is 1 270 1.99
2 DE 12 1 270 1675,0 .0.000 21.OW 48 30 32,00 15.00 32 116,01 2.27) 30 0114 X 000 18-000 48 30 32DO 15-00 32 174.0 141 30 150.61 0.99) 16.001 15.001 8:7 18.71
PB 5/6
1 SE 12 1 270 675.0 9 875 9.875 48 30 38.00 15.00 20 85,4 1.67 30 113.2 2.22 10. 15.00J 74 8.4
1&2 SE 12 2 70 1349,9 9.875 24.000 48 30 29 77 15-DO 36.46 246.1 4.82 30 67.5 1.32 18.23 15.00 4.7 14.1
1,2&3 SE 16 3 70 3037.3 24 000 24.000 49 30 32.00 .5.00 32 189.8 3.72 30 151.9 2.98 16,00 15.00 5.3 6.2
12/4/2007 BURSTING BAR 9:50 PM
#Strands/ # Vert Horz CGS VERTICAL BARS HORIZONTAL BARS 1 Ast= 0 31 #les 4
Tendon Tendons Fu Psu da da 0 B y x dsp TBmT I AST I dsp Tau- AST d5unT dww Spacing Spacing
PB-7A SA Vert Horz. Vert Hors.
15E 12 1 270 675.0 9.875 9.875 48 30 32 8 32 116.7 2.29 16 64.6 1.27 16.00 8.00 8.7 7.8
1&2 SE 12 2 270 1349.9 9.875 24,000 48 30 32 15 32 233.3 4.5€ 30 67.5 1.32 16.00 13.00 4.3 14.1
1 DE 19
1,20E 12 1 270 675.0 14.625 11.04 2 2 270 1349.9 14.625 21.0 0 48 30 32 15 32 183.21 3.59 30 1OL21 199 16.001 15.001 15.51 9.41
#Strands/ _ # Vert Hort CGS VERTICAL BARS HORRONTAL BARS Ast= 031 #Legs 6
Tendon Tendons Fu Psu da da D B y x dsp Teuass • AST.. I dsp TauRstAsT 4ww dww Spacing Spacing
PB-1113 Vert Horz. Vert Horz,
1 SE 18 1 170 1012.4 12.250 12.250 48 60 3550 21.00 25 129.1 2.53 42 179.3 3.52 12.50 21.00 9.2 11.1
1&2 SE 29 1 ^70 1631.1 11.000 34.000 48 60 35.50 30.00 25 228.4 Q Q8 W 176.7 3.46 12.50 30.00 5.2 16.1
1,2&3 SE 40 1 '70 2249.9 12.250 17 750 48 60 32.00 15.00 32 347.1 6.81 30 229.7 4.50 16.00 15.00 4.4 6.2
1,2,3&4SE 5€ 1 270 3262.3 12.250 24.003 48 60 32.00 15.00 32 503.4 9.87 30 163.1 3.201 16.00 15.001 3.0 8.7
I SE 19 1 i&2 SE 1 15 2 ,70 2024.9 12.250 29.500 48 60 7950 30.00 39 347.2' 6.821 60 270 1012.4 12250 12,250 48 60 28.5a 21.00 3 173. 3,4 42 57.31 $051 19.501 30.001 15.31 11.1`
2 3 1 11 1 70 618.7 14625 11.000 48 60 18.00 1150 36 2 270 1237.4 14.625 44.000 48 60 18.00 30:0 36 183.71 360) 60 82.5 27 1 1. B 001 30.001 19.31 34.51
2&3 DE 11
#Strands/ # Vert Horz CGS VERTICAL BARS HORIZONTAL BARS Ask- 0.31 #Les 4.
Tendon Tendons Fu Psu da _ da D B y x dsp TwRsT I AsT dsp TwRsT 1, AsT deuasT deuw Spacing Spacing
PB-1113 _ Vert Hoa. Vert Horz
1 SE 18 1 270 1012.4 12,250 12.250 48' 60 35.50 21.00 25 129.1 2.53 42 179.3 352 12.50 21.00 6.1 7.4
1&25E 29 1 270 1631.1 11.0D0 34.000 48 60 35,50 30.00 25 228,4 4.48 60 176.7 3.46 12.50 30.00 3.5 10.7
1,2&3 SE 40 1 270 2249.9 12.250 17.750 4B 60 32:00 15.00 32 347.1 6.81. 30 229.7 4.50 16.00 15.00 2.9 4.1
1,2,3&4SE 58 1 270 3262.3 1...250 24.000 48 60 32.00 15.00 32 503.4 9.67 30 163.1 3.20 16.00 15.00 2.0 5.8
50 12-250 49 60 28.50 21.00
173.6 3.40 42 179.3 352 19.50
7.11
1&2 SE 1 ,.8 2 270 2024.9 12 250 29.500 48 60 28.50 30.00 39 347.21 6.811
60 257.31 5.051 19.501 30.001 3.6 7.41
2&3 DE 1 11 2 270 12374 14.625 44.000 48 60 18.00 30.00 36 183.71 3.601 60 82.51 1.621 18.001 30.001 16.21 23.01
4—
41- 1- 2-
ECI 9) 12 ANC440RAGE
OB=CK
&
-it"Ni.M,
CS
I'll 2
EQI Co 15 ANr-HQEAQE eleven p
TYR GROUT VENT DETAIL
AS 6WOUN FRECQP'IOmED BY FIC
SEE EaAM ELEVATION FOR LOCATIONS.
1 - 1145 V–Vll— M TAFW
n�a
A-,
T
GROUT VENT 5ADDLE
SEE DE�ELEVATION FOR LOCATIONS.
mm M,
'Z' FACOR DETAIL
T rl.!,�"—
wLu
W
gul PM
z
- 1 144- 4-1
lw1r
�xy.� ,�.�: .�T �m
�.,.w n�,µr .,. -. �w�rmxi. .�. ,n..a,.�.�w — ,.���.�„ � �LL �_�
0. VOL%N ANCHORAGE
A'—
$6N DEAD END ANCHORAGE
PT5
�L-V F
R 36 3'
tF?�R@EE31:std t>� p
7191 nk 1 f� B S 5.1 3131919 3 s k 6 8 s
-IT T 115
7ik ny I Ig a
I1) ,
� l� � Emdim
5��E955�95�
Q � �« Ca � i `fs4S S4 S S 44Fpf 4�D
o L
O s,76444rt449F4'•'•to
1 9e � a
'� • W a Y 7 F Y s 3 S 2 7
61T
I 8k 6� 44
I i'(
6 �F
5% 44
a
•
4% s
4
—n 4�R 4 7
Q U3 x
� Ir
44 R .
498
d
all
•
w
�D w
r
•
Kk I 0 +
^ ,.
0
i 96
�dus-nn
I
EIATAIL PB-344
GATEWA7 WA r. Dare rt„e a+ er
--7 t4l n
cov,
At-
a gig I a j
z-1
37'
EI336 04
411_
2 U3
3k,3%
44
m-P
rr
to
LD Sib
114b
Al I
n%
36
aw,w a is
4
oft
Uk
BEAM DETAIL
TAIL P5-54
ES KETIQULGATEWAY
opwv&
LES
WA ora l-' er
S5 Qm i4a@a I.cacisiF
36
151114I F�Itg99999999��a9Q
II l i
�� 10 114 II�� ®� 6
I�I
S21
� !I � IP + rl �;4.49\49 a4FF+gip
� it m p I F�44444444 - '-4�0
I �
All
I a
If 54 4 � c
I
k. U3
g
A
gq
41i
s
F
A 6% �
A
I �
1 �
Im z
o �
18 —
>..1
Rr R�
yYNDtwk ~
IObii�3`it '
1 BEAM DETAIL PB-5Ad6
j'ORT ANGELES
` tl I -
NTERNATIOL4 GATEWAY c se va o rcrt a w.
PORT ANGELES WA >..m wx case men er
_
31*Go v:, I F ® a $$s ads s c $
- -- �
—— -
t3k —
A� II ,, s5sssssisss'.1.1 1204s
dI �
IJ3�tl� se -a ea soros a
� I dddccc
It
' 1 �
jj t 3 Y Y Y Y Y Y Y Y T iC Y�D
s .•• I� j� s 4 4 4 4 4 4 6 4•!t 4�p
it u
j I
a I
ul d
A
�A $
i
q � �
4b
44 t0
m jh-
� IIID
f
s
0
em 11� � 1� � ( " i
as AO%- s
1
OO
22
®sell 3Z' --
BEAM DETAIL PB-148 T.
b6TIME
RT
yr INNTTONAT _]M
IONAL GATEWAY ¢v>,fl st: cE ono^ ` F a cw avmrru- wr
PORT ANGELES WA
- ®® 32'a AL ri # ;■!f,!|;|,£� .
■,I■ � ��■�� ■■,!!■2
| l -
_
_
k ` ., §
\ . \ III Hill
|
� ,� ■
AS
■
.!T,�■,,,�n,.\
q
n |$222„■
} ^
\ § $
� ( §
|� 1-0
■� |u)
�6 4
|
| �
-
�m
q % ,
� -
,
I �
� § \
� � � ( �§ � ■
@ �2
. # ` ` -
_ f .
244 |§
4 E
- -
� | - EM D �% FTE-A434 RK
| ?EWalIaL` UIUE #mT=LE aa <a _ _
3v.3Abi ��' i —� E�fi'��>r3FjFdE�fg�
1914 33'6
411
@
YYYS k 1E I E�-
U3 H+1 I
tO 3% (744844444!'•':
JI
Q
-b
@
gk
.14
—LP4
IM
it'I
4 44-1L
T
4 q
Olt
3A%
ad
2;�7
214
AIM,Q
LJ
-777
IL—i I
)
;7 1 'Xill-34
4 R
4 10 5M. DETAIL PB-11 ,m.
,12413 eg . aw
ST��
Ul --Amp
FORT ANGELES
INTERNATIONAL GATEWAY Ir,SFR
FORT ANGELES WA
E P if 1 .1,1)TY C 301 East 6th Street,Suite I
& ASSOCIATES Port Angeles,Waslungcon 98362
Fax(360)417-0514
/ E-mail:�u��o���.ou
NovomberG. 2OO8
'
Mr Jim Uody
Building Inspector
City ofPort Angeles Department of Community Development
321East Fifth Street NOV, 0 7 2008
Port Angeles,VVAQ83G2
aTy OF PORT ANGELES
SUBJECT Port Angeles International Gateway '
Dear Mr Lierly-
I have reviewed the response letter from Ade Bright dated October 28, 2008 concerning building
inspector's letter and meeting notes/outline notes ofOctober 7 2008' His response letter does
not adequately address all the issues in the outline and is not acceptable to this office. It should
be noted that Ade does not appear to have all my comments in the outline and he should include
all my comments in his response. I will not provide a complete review of his letter but will
highlight the following portions (see outline for item numbern).
Item B.) Details not provided to clarify issue of bearing with reduction in wall width to
S' due tompoUing.
Item O1|nmeeting Ade appeared boindicate that loads donot include live loads.
Item 2. 0Cause ofcracks and construction loads not completely addressed.
Item 3. AJReason for cracks bobaaddressed. Ade boaddress this issue and comment
that design was performedbyothers. Provide his approval ondnaviawofthe
design, including shop drawings and structural calculations.
Ade should provide a complete response to the items in the outline and should provide
calculations where necessary tojustify his responses.
Also reviewed adthis time|ooletter dated October 2O 2UO8byIngo GoUorofExe|boohwhich
agrees with my opinion that Ade has not completely and specifically addressed the issues noted
In the outline. Ingo s letter also contains several items related to the design which may be
possible causes of the spalling/delamination and cracking that must also be addressed by Bright
Engineering owpart ofhis response.
A third letter by PCS Structural Solutions was also reviewed by this office-.This letter does
discuss possible causes of the various cracking but appears to be only a cursory review as is
noted inthe letter It does bring up a discrepancy concerning the actual superimposed dead load
onthe structure. |t|onoted that Ade used o1SUpnfsuperimposed dead load wnthe deck while
PCS indicates a 50 psf superimposed dead load more accurately represents the loading on the
deck. This discrepancy shall be addressed by Ade including what affect this would have on the
design of the structure since the dead load is less than he figured and thus would affect the
camber inthe PTbeams and what PTload was specified inthe design. |tshall benoted that the
letter from PCS is not considered by this office to be an independent third party review of the
design and iaonly cursory innature.
The issues noted above must be addressed prior to final acceptance of any proposed structural
repairs. That said, this office is willing to allow construction activities to continue with the
placement of the topping slab to complete loading of the deck provided the following conditions
r
R '
Page 2,
November 6, 2008
Gateway Project
1) Shoring under P133 shall be provided to protect against catastrophic failure of the
structure prior to allowing placement of the topping slab. This shoring shall be
designed by a structural engineer licensed in the State of Washington The shoring
shall be designed in such a way to allowing the beam to move under the increased
dead loads created by the addition of the topping slab without affecting the load path
on the beam.
2) A monitoring program shall be developed and approved to monitor the deflection in
the beam as it is loaded as well as monitor the cracks in PB4 during loading by
placement of the topping slab.
3) The monitoring program shall be developed by experts in the field and shall be
initiated prior to placement of the topping slab with ample time to develop a baseline
to account for movements due to temperature.
Once items 1-3 have been adequately addressed, the contractor may place the final topping slab.
It shall be noted that placement of the final topping slab does not constitute an approval of the
previous issues or the additional issues by PCS or Ingo which must be addressed prior to the
approval of any proposed structural repairs to address the spalling/delamination or cracking. Any
proposed structural repairs shall be submitted and approved prior to beginning any repair work.
Please be reminded that the building shall not be occupied until all design questions have been
answered and any required repairs have been designed, approved, and completed to the
satisfaction of the City of Port Angeles Building Department.
Please call me if yo hav any questions on this matter
Sincerely
Tra Gudgel, P.E.
Fc: JN 08091 11 01
lt`
O
NS i
REGI ¢�
SSIO��
r �
- rl,34 Qng[neering Inc Consulting Structural and Civil Engineering
November 12, 2008 BEI# 116 03R
Parametrix, Inc.
Attn. Stan Cruse,Project Manager
2102 N Pearl Street, Suite 301
Tacoma, WA 98406
VE
R.E. PORT ANGELES INTERNATIONAL GATEWAY Nov 13 2 D
Response to Zenovic& Associates, Inc. ��8
CITY
dept.o�C"'p"' T gNGE[ .
Dear Stan ORy��unit
ve1pDes
nt
Our response to letter dated November 6, 2008 from Zenovic&Associates,Inc. is as follows.
Item 1 B.
We have provided calculations to show that an average of 5" deep bearing is all that is necessary to
support dead plus superimposed dead load. Our uutial proposal was to make the repair after that,
and at which time the bearing width would have been filled to at least 12" the thickness of th6wall
for any added loads.No further calculation will be provided.
Item 1 D.
In my letter dated September 30,2000, 1 indicated the magnitude of dead and live load reaction for
PB3 at the east wall I also stated that under ultimate dead load (which includes contribution of
loading the deck), approximately 5" bearing depth is required. This is consistent with our response
of October 28 and the calculation submitted November 7'h
As stated above,we are not concerned about live load effects for the existing bearing condition
simply because full bearing depth would be in place prior to the application of live load. There is no
calculation for proposed repair since the bearing area after the repair is more than adequate. Repair is
based on our professional judgment.
Item 2C:
We cannot comment on the effect of construction loads on the cracks because we were not present at
the site for observation.
Our letter of October 28'h included photographs and statements from October 7`h meeting related to
significant ground settlement when sheet piles along the east walls were being removed. We and
Landau Associates have also noted in previous reports significant ground vibration while the sheet
piles were being removed.
Noting that the crack is almost in line with the waler among the factors we have mentioned it is
conceivable that in may be induced by the vibration. Again, we cannot conclusively claim a
w
Mr Stan Cruse,AIA,LEEDv.2 AP
November 12,2008
Page 2 of 2
particular cause for the crack as Zenovic is requesting. In our opinion, the location of the honzontal
e
crack does not compromise the structural integrity of the wall.
Item 3A.
Again,we have addressed the issue of these cracks to the best of our knowledge. We have also
attached copies of reviewed shop drawings which we believe the COPA has copies of Zenovic
should note that we only reg,iew shop drawings and not approve them
We have reviewed our work and are satisfied with the design. However, we can only comment on
and not draw absolute conclusions to the effects of material,means and method of construction,
matenals placement and their conformance to design drawings. If Zenovic&Associates has done
some calculations or has expertise or experience in these matters, we would like them to share it with
us, because their persistent requests in view of our responses suggest so
Deck Supenmposed Dead Load.
As noted on page 5-001 of previous submitted calculation, dead load is 94 psf, superimposed dead
load is 52 psf. Total dead load is 146 psf,but rounded up to 150 psf for which the PT was
proportioned_ It is for this reason we have persisted on loading the deck so as to balance the stresses
in the plaza deck.
Our only contact with PCS with respect to this protect was on Monday of this week to discuss their
expenence with our initial sketch of the proposed fix. We do not know what matenal they were
provided for their review and cannot comment on the scope of their work.
Zenovic s Conditions for Loadin-R:
With respect to the conditions placed on loading the plaza, we can only comment on Item#1 We
elect to do the repair pnor to loading the structure since it is our opinion that there is no benefit to
the proposed shoring method. We have consistently maintained that the plaza can be loaded without
the repair With respect to items 2 and 3,we would defer them for future discussion with Parametrix
and the COPA.
Finally, with respect to comments regarding PCS independent review and responses we have
provided thus far,Zenovic's comments, without the benefit of any calculations or assessment, is
unprofessional. We will limit our responses only to those comments that have technical validity
Please call me if you have any questions.
Best regards,
1 �
L Adk-J Bright, Ply I
ELECTRICAL PER1 T INSPECTIONRECORD
360-4.17-4735
Application Number 07 00000672 Date 10/23/07
Application pin number 715456
Property Address 123 E FRONT ST
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000
Application type description COMM NEW CONST
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 138675
Owner Contractor
Clallam Transit System PRIMO CONSTRUCTION INC
830 Lauridsen Blvd PO BOX 296
PORT ANGELES WA 98362 CARLSBORG WA
SEQUIM WA 98382
(360) 683 5447
Structure Information 000 000 CLOCK TOWER
Other struct info TOTAL % LOT COVERAGE 1 00
HARD SURFACE AREA
NUMBER OF STORIES 1 00
EXISTING LOT COVERAGE 1 00
LOT SIZE 1 00 .rte
PROPOSED LOT COVERAGE 1 00
TOTAL LOT COVERAGE 1 00
NUMBER OF UNITS 1 00 1 V
Permit ELECTRICAL NEW COMMERICAL
Additional desc OLY EL / 400A 3 225A PNL
Permit pin number 113787
Sub Contractor OLYMPIC ELECTRIC
Permit Fee 382 00 Plan Check Fee 00
Issue Date 10/23/07 Valuation 0
Expiration Date 4/20/08
Qty Unit Charge Per Extension T1
1 00 175 0000 ECH EL COM 201 400 NEW SRV FEEDER 175 00
3 00 69 0000 ECH EL COM 201 400 NEW ADD SRV FDR 207 00
Other Fees STATE SURCHARGE 4 50
Fee summary Charged Paid Credited Due
Permit Fee Total 382 00 382 00 00 00
Plan Check Total 00 00 00 00
Other Fee Total 4 50 4 50 00 00
Grand Total 386 50 386 50 00 00 n
19
1
INSPECTION ELECTRICAL
TYPE DATE RESULTS INSPECTOR
DITCH (I k?
SERVICE
OUCH - IN
66 4
FINAL
COMMENTS :
10/16/2007 13 46 3604523498 OLYMPIC ELECTRIC PAGE 01 ,
AppLICATION
TxYCALwo�xpy
c
Inst Iladmt deseiriPtlon
eetrlcal Contractor o )E
O Owner Commecelal
tesldenaal
Job wired byEl
Blectricsl controctor name
i.icoose cumber Date Expires �eN, d Allered/Additioo
a
mailing address New V �
r State ZIP
City /
FAX number
Telephone nvmbe
�jl �If��
Preadtes owners psme r�.
Address O IospeellooI F�Ar�f SitZ.
("1
Cftp Awl
phone number to sebedule Intpectloat 6
owner as de1lned by RCW.19,2&261:(1) owner will oethe structurefor two r>
yegrt gRBr Jhis dedMool yarn
dr Is !trod(2)Owner is required to hire on elecb1cal Q Cosh O Check#
cooancror(f above sad prODerb b Joe dale,roar or 1809. Discover
After reading the above statonm1t,1 hereby eortily that 1 a the owner of Mc above M6ditCard � U Steroard
or a licensed electrical contractor. 1 ttrn melcinII the oleetricai Indite- INGCe
taQ property compliance with the eledrictl laws.N.B.C., RCW.Chapter
latioo of oltetstton in omplianc The City of Port An!<ela Municipal Code, and Cn[d# _
19.28,WAC. Chap
Utility Speclficadoa trlesl odnslatorpitadoILDW fe
Slspsture of er,Clectrical'contrsct or clecAP
of $ dt� vl
Date: 1/7/0 _ 1
X dAd M ptaK
O vo No LOAD CHANGES 1460 Ph ag a 0.
0 Sweboard _KW
D Overhead Sarvloa Service Stte:
rnSO'
O Furnace —KW O Temp Service Feeder SO: Q–
(3 Heat Pump _Ton LAR Underground SONlce
O Fan Wall —KW
SAME DAY INSPECTION CALL BEFORE 7.00AM AT7-4135 HOW
ICE
Rove-nv L7T LF ____
t�pr
Us
=::::7M
MAL
w
a•
DW 'c a ElecMasl
Arca,Building or Equipment Ltsp feted Action Taken Inspectof
Mspectioo
pate
�0.�3 0.7--
P2aStzY FA ib 115,e-xF,,.,e• #
I l �i7 L T cW
n t '� -/
�10 1
2001
of°°RraN ELECTRICAL INSPECTION
c�`�N
y WIRING REPORT
R-may 417-4735
DATE PERMIT# INSPECTOR
a
3 it 0'7-0(
OWNER/CONTRACTOR
+_Yrs- 14L- CLI-C� LC
ADDRESS
iz FrpPi,T- S -7 —
APPROVED NOT APPROVED
❑ DITCH ❑
❑ ROUGH IN/COVER ❑
❑ SERVICE ❑
❑ FINALf
CORRECTIONS NEEDED L-A$1EL �� 'Lp�.(Al �S GGRTLmr-
ba4L1Er pKrbA. i�T1�TZiO Go19fS
J`1IIc X06 -e1
5MASm F I T- fL -A 11¢ 9Z A 1241 wL Dih T-S
l�lr£c 1/� lZ�A
NOTIFY INSPECTOR WHEN CORRECTIONS
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
0VVORTA& ELECTRICAL INSPECTION
WIRING REPORT
°wo KS 417-4735
DAT PERMIT# INSPECTOR
O ER/CO RAC OR
L G
ADDRESS _n
APPROVED NOT APPROVED
❑ DITCH ❑
❑ ROUGH IN/COVER ❑
❑ SERVICE ❑
❑ FINAL ❑
CORRECTIONS NEEDED- 1 WovL,D t- /.( "r'o
1C [}A"-pr-12 !J/-11-1J 1-L l d d=-"D IZ—
end sP &XMo fL. 1-16 nAl S,l e.kr
L-e—
Irl G. ©Farb)a l`l
lc�t�17 It' r3e�-1 L�
NOTIFY INSPECTOR WHEN CORRECTIONS
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
�>°Fp, �F� ELECTRICAL INSPECTION
U/v"�N
y WIRING REPORT
G�`�°w°�.s�``'� 417-4735
DAT PERMIT# INSPECTOR
!� z -(7Z
OWNER/CONTRACTOR
L-q lo- ;p , L
ADDRESS
I-2-7-> IC= 1 ry 1
APPROVED NOT APPROVED
❑ DITCH ❑
❑ ROUGH IN/COVER ❑
❑ SERVICE ❑
❑ FINAL
CORRECTIONS NEEDED. L PBV-L,
�R►�Fig- �L9�2 � _ G>-��zt�, t�91�.�
cS oaf A U- 7bs AU�H{Y"S, Y} rL
NOTIFY INSPECTOR WHEN CORRECTIONS
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
oFpoR,rgk ELECTRICAL INSPECTION
c
ti WIRING REPORT
°woRKS&,s�`��� 417-4735
DgE �Blco PERO7-067 2, INSPE
OWNER/CONTRACTOR 7
ADDRESS
123 5—
APPROVED NOT APPROVED
❑ DITCH ❑
❑ ROUGH IN/COVER
❑ SERVICE ❑
❑ FINAL ❑
CORRECTIONS NEEDED•
tas7rge" glemQ`,1rz 5m
�¢��G)c►�- K<tzo
�rotC- 1b01b0
NOTIFY INSPECTOR WHEN CORRECTIONS
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
FpORTgNOy
ELECTRICAL INSPECT
ION
� 0�NWVWIRING REPORT
�W
°wo KS 417-4735
DATE PERMIT# INSPECTOR
a S I
OWNER/CONTRACTOR
OLS ��1L Z
ADDRESS
/717j
APPROVED NOT APPROVED
❑ DITCH ❑
❑ ROUGH IN/COVER ❑
❑ SERVICE ❑
❑ FINAL ❑
CORRECTIONS NEEDED
S'C2�LZ0rL -1uaL
'�'ps P l rr-L s do, d-,c)J uc–x it)l
m FEC, 110 1 Z(77 A
NOTIFY INSPECTOR WHEN CORRECTIONS
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
oFP°RTaH ELECTRICAL INSPECTION
y WIRING REPORT
c F�
RKS& 417-4735
DATEINSPECTOR
Im
OWNER/CONTRACTOR
L
ADDRESS
APPROVED NOT APPROVED
❑ DITCH ❑
❑ ROUGH IN/COVER ❑
SERVICE ❑
❑ FINAL ❑
CORRECTIONS NEEDED•
LA3 � �t q nI� S +
Fjbqj V;
NOTIFY INSPECTOR WHEN CORRECTIONS
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
o*QORT4 ELECTRICAL INSPECTION
61 -���N
WIRING REPORT
RKS 417-4735&3t�
DATE PERMIT# INSPE
12 D`7
OONTRACTOR
N�ER/
ADDRESS
APPROVED NOT APPROVED
❑ DITCH ❑
❑ ROUGH IN/COVER ❑
❑ SERVICE ❑
❑ FINAL ❑
CORRECTIO{{N��S NEEDED• `r�
NOTIFY INSPECTOR WHEN CORRECTIONS
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
0 p F,� .7 _
A
�.°°RrjN ELECTRICAL INSPECTION
ti /wCF!
�-� WIRING REPORT
U N
°woRKS& 417-4735
DATE "'-� PERRMIT# / INSPECTOFL
'I o L 6-7
- b-
OWNER/CONTRACTOR
ADDRESS
3
APPROVED NOT APPROVED
❑ DITCH ❑
6,w-'OV!4j> ROUGH IN/COVER —
❑ SERVICE ❑
❑ FINAL ❑
CORRECTIONS NEEDED-
NOTIFY INSPECTOR WHEN CORRECTIONS At
ARE COMPLETED WITHIN 15 DAYS
— DO NOT REMOVE —
OLYMPIC PRINTERS,INC.(360)452-1381
GENERAL NOTES:
NOTE SEE NM SPECF1C TO EAN RAN MR <
ADDRINN NOWTION. �.g!
RAILROAD AVENUE MX MR 8 NE 311
- - - - - - - -
I I I I I I KEYNOTEILEGEND � �^
I I I i I I I Y ETF RANTER 'Q
coli$
h GR
I I I 20Iri
mg
I I— / ; 1A .Eg
I I -(, C
(--4
IA CONiFAM TOPRO IDE PANIC ACCESS TOit 09M REAR DOOR THROUGMUT 7HE
%0M7RWM TOP09UC SOMALI(
iR EdI on MGGD STAIR WAS mom.
— — — — � NE90 * ;;� —
;WWPARMy GPa,O low,
I I as p NOT UM >�
11 mv Cmatm mom
tt t ; I — — — — — — — — ® FIRE 7041M RISER RM
E38.TRICAL R11N g
TRI'tl1Y mm Um
g g f�
Q NOT USED
I I \ I 30 ® NUTUSED
Nm usm
4*SIRFMO.TM = I - 9Q NOT URD
Na Um
I I A4A1 I I fs I ® Nat USEDE�VATUR
EQUIT ROOM --- - I e n Nm 16m
I �
I b u I �i IG
NEN PRE-E RIMED CONC/IETAL SDOt
ow
` — — — — — — — — — — I - - - `'=� -Q'®— — — J7 — — I — --{ I- AVING REFER N CI& 3
I I 0 �0�00 `J cc
c
15
NOT USED 2
I I J —)�BK.YCIE RM v 16 YPRIICN B CYCLE mm
DS
I I 1
If I I I OUIUNE OF NOT URD yQ `
SIGN I m I I i I PM AM ® Wr USED ca4�
- - - - - - - -f- - - � -
zPEn
TO ,� zG's' 's'-0' --- ® Nm usm
' 4? V
II eR - ♦ Y-6' Y ITYP• I 21 NOT USED s
NOT USED ,0
III'RJ IIIco
r.Aee11N8 BD 8%BXBiTAA1M NOT URD C
r WFJf PAN7p BENB &B I I� .!Q _— J--� NOT URD Q a
Y— ' F -----� Nm URD
®
mar um y
e ---------
-- _ 1 ® E�
-== _ t -— —� — — — I — D ® NEM PAD M)=JAM ER I� U
s,EFL(PAOIRD)eatARGs SFE oJ/A0.05
® MMTm IPO TAM SEE AOO.01
ENIER PARING ——J — — — — —•• - C.2 ® Nu CONCRFWG
IE PAV
0OURM a 3Q t"BMW/NO WWW PARING GARAGE
PROVIDED uran.FFl1DES a T FOR VEHICLE
�izMt�1XIM
PEDM W�AG�CF.Si.MAW NO SE OF
`'�'�
B'COIICRFIE WSNRf — 9� I STAUJ%MN"CLEARANCE AT SERXIM
IRalEA5l0E OF ITT.OEDIQ. I _ ♦� —� APPEARANCE.SIGN SRIUCRAVLmum
(� -ffI I SYSTEM,FIRE SPRAOGER S61E11.POWER •
T j t AND LUM
I ( AT MEFPm SR)RUX ROOM 1FOm THE CW
• -- — — AIRF— A Pr*dNo. 7014116401
— — RISER RM ®I i I I § i sGt STO SIRI ABWE AND 4 F M FROM THE CEDIC pl z S
® INCH CLEAR OPPENNGS�N CENTER Ar 11107
THE
W.. ALL Issue 04!
-^.. — = — —• ORevisbns
CT.r i 4 SUNS 0 10'-0' 4 STALLS 0 10'-v 1—WI 7 AOA S BEE AWF
SI1fEET(EXIFNT QF V010LW HANG
I UNDER SOEWAN UMGIOWI) I I 19 I FRONT Snm I —
I I I I I I I
I I I I I I I
55'-0' 3B'-11' 29'-7' 33'-1' S9'-4' 54'-10'
d
0.1 0.5 0.8 b Lower Site&
r
LOWER SITE PLAN o Parking Garage Plan
sovE: t• zo'-a'
"+
A0.0
l
t ORT NGELES
{,. ;¢ '�,`- WASHINGTON, U S A
.; Public Works & Utilities Department
_4
h August 29, 2007
41' 'elk"
r ��� •'�i'YjI Cev.
t{:
Clallam County Transit System
'� ' ;,tw;y,„ 830 West Lauridsen Blvd
}>
x, 1.,. Port Angeles,WA 98363
tax :i:
RE. Port Angeles Landfill/Transfer Waste Disposal Application,WDA 07-41, Acceptance
of petroleum contaminated soil from the Gateway Transit project located at Front&Lincoln
Streets,Port Angeles
IN
We have received your application for the disposal of petroleum contaminated soil from the
referenced site and the testing results submitted by Alkai Consultants, LLC and CCI Analytical
Laboratories Based on the testing results the soil appears to be acceptable for disposal at the
transfer station. Clallam County Environmental Health Department has reviewed the report and
approved issuance of the enclosed approved waste disposal application. A copy of your approved
application is attached. This approved application must be shown to the landfill scale attendant
at the time of disposal.
Please be advised that disposal of debris and material other than the petroleum contaminated soil
covered in the report will require additional disposal applications and approval t �
Please call if you have questions I
Sincerely
Stephen Sperr
City Engineer P.E.
SS/:tf
Encl. WDA 07-41
Copy Claudia Stromski
Alkai Consultants,LLC
N:\PWKS\ENGINEER\WDAPPLIC\07-41 WPD 3
FILE:Landfill Solid Waste Disposal Applications S`
Phone 360-417-4805 / Fax 360-417-4542
Website wwwcityofpa.us/Email publicworks@cityofpa.us
321 East Fifth Street P 0 Box 1150/ Port Angeles WA 98362-0217
�XJW CO
• ;QJ- Clallam County Department of
Health and Human Services
_ Environmental Health Services♦223 East 4`h Street,Suite#14♦Port Angeles, WA 98362-3015
• ,.V Telephone:360-417 2258 FAX.360-417-2313
$`
Hum o'
August 30, 2007
Trema Funston
City of Port Angeles
321 E. 5"' St
PO Box 1150
Port Angeles, WA 98362
RE. City of Port Angeles Waste Disposal Application 07-41
Dear Ms. Funston.
Based on the chemical test results submitted by Alka> Consultants on behalf of Clallam Transit
System, Clallam County Environmental Health Services (CCEHS) concurs with the disposal of
25 yd3/30 tons of petroleum contaminated soil (PCS)to the Regional Transfer Station. The
material is comprised 100% soil. The PCS is from a heating oil tank discovered during
excavation for the Gateway Project at Front and Lincoln Streets in Port Angeles.
If you have any questions,please contact me at 360-417-2347 orjgarcelon@co clallam.wa.us.
Sincerely,
Jennifer Garcelon, RS
Environmental Health Specialist II
C. Andy Brastad,Director of Environmental Health
PALF File
Correspondence File
8/30/2007 Trenia Funston WDA07 22.doc Page 1
From 'Garcelon Jennifer' <JGarcelon@co clallam wa.us>
To 'Trenia Funston' <Tfunston@cityofpa.us>
Date: 8/30/2007 9.06 AM
Subject: WDA07 22.doc
Attachments. WDA07 22.doc
<<W DA07 22 doc>>
Trenia.
Here is the unsigned Waste Disposal Application for the Gateway Project.
The signed copy is in today's mail
Let me know if you have any questions.
Thanks, Jennifer
Jennifer Garcelon MPH, RS
Environmental Health Specialist II
(360)417-2347 phone
(360)565-2615 fax
http.//www.clal lam.net/EnvHealth
Always working for a Healthier and Safer Clallam County
ORT NGELES
WASHINGTON U SA
FQ
�® Public Works & Utilities Department
V +{t
,r
tMj
.7;
TY
August 29 2007
MS Jennifer Garcelon, RS
Environmentalist Health Specialist
Clallam County
Department of Health and Human Services
223 E Fourth Street, Suite 14
Port Angeles WA 98362-3015
RE Port Angeles Landfill Disposal Application, WDA 07-41, Petroleum
contaminated soil at Front & Lincoln, Port Angeles, WA
Dear Jennifer-
Please review the attached landfill waste disposal application (WDA 07-41)submitted
by Clallam County Transit System
Please call Steve Sperr at X-4803 or Trenia at X-4807 if you concur with disposal of
the petroleum contaminated soils Thanks
Sincerely
Trenia Funston
Engineer Specialist
N:\PWKS\ENGlNEER\WDAPPLlC\07-41 CCH.W PD
File:Landfill Solid Waste Disposal Applications
Phone 360-417-4805 / Fax 360-417-4542
Website wwwcityofpa.us/ Email publicworks@cityofpa.us
321 East Fifth Street P 0 Box 1150 / Port Angeles WA 98362-0217
Aug 28 07 02 48p Fllkai Consultants 360-613-2408 p 2
,t paRT,4
=� PORT ANGELES LANDFILL
WASTE DISPOSAL APPLICATION
To. City of Port Angeles City Engineer Phone: (360)417-4803
321 E Fifth Street FAX. (360)417-4709
PO Box 1150
Port Angeles Washington 98362
NOTE. All questions must be answered for waste to be approved.
1 Generator Information.
Cf ff '` S sfew.
Company Name. a- °�-� C.�^�+Y ��"�S �� Y
Mailing Address: Sao LJ I.A'J s,-o. B 1'/.�
Contact: e
Phone. 36 0 - ti 5 2- 1 3 1 S
Project Name. Go. u.�ay �n Ee. ,nc+.T a h 4.i rrcL, Sp �c.T o Pro CC�
Project Location.
2. Other Contacts (if applicable)
Consulting Firm: Rl jc4 r C�^sal -G � -s , Lt-Q_
Contact:
Phone.
Contractor Name.
Contact: R o G^ Oho^a
Phone. 360—ys= -S95Z
Laboratory* Gc r A" -JY¢- c--�
Contact:
u
Phone. ti 2 S— 3 56 - 2-C-06
City of Port Angeles Landfill Waste Disposal Application Page 1
Flue 28 07 02 49p Alkai Consultants 360-613-2408 p 3
3, Source of Waste"
Check the appropriate box below and briefly describe the project, process, and/or cleanup that
will or has produced the waste requiring disposal. Include the gasoline service station number
(if applicable)
CERCLA/MTCA Remediation Agency Contact:
Independent Remedial Action _X UST Removal
Unused Chemical Product Spill Other Source
4 Waste Material Composition (check all that apply and include percent of total)
Soil —Lo 0 % Foundry Slag
Concrete/Asphalt % Dredge Sediments
Preserved Wood % Debris
Coal Ash % Other(list)
Wood Ash
NOTE. Total must equal 100%
5. Waste Material Contaminants (check all that apply)
Gasoline Metals Diesel
Solvents x Heating Oil PCBs
Unused Motor Oil Used Motor Oil/Waste Oil
Other Other Petroleum Product
Unknown
NOTE. Supply any MSDS information with application if available
City of Port Angeles Landfill Waste Disposal Application Page-2
Flue 28 07 02 49p Alkai Consultants 360-613-2408 p 4
6. Estimated Quantity of Waste for Disposal,
Cubic yards/ 3 S Tons (estimate both)
Drums I Tons (estimate both)
Other
NOTE. Estimated quantity for disposal must be within 20% of the quantity actually
disposed (10%for projects over 7,500 tons or 5,000 cubic yards.)
7 Frequency of Disposal.
_ X _ Onetime Monthly Annual Other
8 Waste Sampling:
Proper characterization of the waste for disposal requires the collection of representative
samples. The methods and equipment necessary for obtaining representative samples of a
waste, and the frequency of sampling will vary with the type and form of the waste Check the
appropriate box and briefly describe how and where the waste was sampled. Include site maps
With sampling locations if possible.
Number of COMPOSITE samples & number of discrete samples per composite
Number of DISCRETE samples 3
C' 2C fro r<L.
U SLTrwlcL
S'r��W o•.1 I S 4i�o.( � fJ r-1 �JUTTc•a1 G.l 2/e.. Q0.'^--fQ�CCjr�
NOTE 1 Unless prior approval has been granted by Port Angeles, the following sampling
frequency will be used:
0- 25 cubic yards = 1 composite sample
25 - 100 cubic yards = 3 composite samples
101 -500 cubic yards = 5 composite samples
501 - 1000 cubic yards = 7 composite samples
1001 - 2000 cubic yards = 10 composite samples
>2000 cubic yards = 10 plus one sample for each additional 500
cubic yards
NOTE 2. One composite sample shall contain a minimum of three/maximum of five discrete
samples.
City of Port Angeles-Landfill Waste Disposal Application Page-3
Flue 28 07 02 50p Alkai Consultants 360-613-2408 p 5
9 Waste Analysis
The 'Dangerous Waste Regulations' (WAC 173-303) shall be utilized to determine the
appropriate analytical requirements for waste characterization Ecology Publication #91-30
(Revised April 1994) 'Guidance for Remediation of Petroleum Contaminated Soils' shall also
be used to characterize petroleum contaminated soils from UST releases. Submit all laboratory
analytical results, QA/QC data and Chain of Custody sheets along with this application.
(NOTE. The laboratory must be accredited by the Washington State Department of
Ecology)
a) List all analytical test methods used.
/UGJ7-f*— 'Jri
P14H, - R'Z70
b) Provide a narrative as to why the above analytical methods were selected-
�3e�ca us c_ ',e_
:92tf let -t y��oTac_. wcL9 da ���vco{
NOTE. Additional sheets attached _ YES NO
10. Soil Classification: (`*FOR PETROLEUM CONTAMINATED SOILS ONLY`*')
Based on the analytical data and Ecology Publication#91-30 the soil classification is_ (check
one)
Class 1 Class 2 Class 3 Class 4
Calculated Hazard Index
11 Dangerous Waste Affidavit:
Based on a review of the analytical test results, site history and the applicable regulations, this
waste is classified as (check one)
Neither Dangerous Waste (DW) nor Extremely Hazardous Waste (EHW)
Dangerous Waste (DW) and Waste Code
Extremely Hazardous Waste (EHW) and Waste Code
City of Port Angeles-Landfill Waste Disposal Application Page-4
08/28/2007 WED 09 18 FA$
Aug 20 07 02 SUp Aikaai Consultants 36D-613-24n8 P B
12. Cartiticauarr_
We,THE UNDERSIGNED, catty that tms appilcatlort Is true to the beat or aur knowlfdgd. All
information provided is correct and the encloadd ans"CMI results roprasant the proposed
watsto material to Ow best of our#bilins:.
Wasto Generator Signature
Tprry G . Weed_
prinked Name
[`1 1 am Tra•,g, +- SX's
Company
Data
City of Pert Angelos Approval:
pa�
City 1=ngineer
0�
Dow
Approval Expiration Date
�-
Q-VAT* ,wW Gv DA- © y
ally of Part Angales-Landfi l Waste Disposal Application Page-e
ZO d 91EI ESV 090 'ON XU W31SAS IISNVNI WVIIV` D WV 50 01 a3M Looz-6?-qnH
Rug 28 07 02 50p Rlkai Consultants 360-613-2408 p 7
ccl
- ANAL
� . ANORAI ORI
LABORATORIES
ADi .(D..0—L.Abom..e.I-
CERTIFICATE
fDa.0—l.abom..e.I-
CERTIFICATE OF ANALYSIS
CLIENT ALKAI CONSULTANTS LLC DATE. 8/28/2007
9465 PROVOST ROAD NW SUITE 202 CCIL JOB#- 0708110
SILVERDALE, WA 98383 DATE RECEIVED' 8/27/2007
WDOE ACCREDITATION#' C142
CLIENT CONTACT SHAWN WILLIAMS
CLIENT PROJECT ID- ACL07-08-EO66
CLIENT SAMPLE ID- 8/24/2007 1030 PA-UST1-SL-01
CCIL SAMPLE#' -01
DATA RESULTS
ANALYSIS ANALYSIS
ANALYTE METHOD RESULTS* UNITS' DATE BY
TPH-Diesel Range NWTPH-DX 9300 MG/KG 8/27/2007 EBS
TPH-Oil Range NWTPH-DX ND(<290) MG/KG 8/27/2007 EBS
Naphthalene EPA-8270 SIM 10 MG/KG 8/27/2007 RAL
1-Methylnaphthalene EPA-8270 SIM 27 MG/KG 8/27/2007 RAL
2-Methylnaphthalene EPA-8270 SIM 41 MG/KG 8/27/2007 RAL
Acenaphthylene EPA-8270 SIM 0.51 MG/KG 8/27/2007 RAL
Acenaphthene EPA-8270 SIM 1.2 MG/KG 8/27/2007 RAL
Fluorene EPA-8270 SIM 6.0 MG/KG 8/27/2007 RAL
Phenanthrene EPA-8270 SIM 8.0 MG/KG 8/27/2007 RAL
Anthracene EPA-8270 SIM 10 MG/KG 8/27/2007 RAL
Fluoranthene EPA-8270 SIM 0.35 MG/KG 8/27/2007 RAL
Pyrene EPA-8270 SIM 041 MG/KG 8/27/2007 RAL
Benzo[A]Anthracene EPA-8270 SIM 0.05 MG/KG 8/27/2007 RAL
Chrysene EPA-8270 SIM 012 MG/KG 8/27/2007 RAL
Benzo[B]Fluoranthene EPA-8270 SIM ND(<0 05) MG/KG 8/27/2007 RAL
Benzo[K]Fluaranthene EPA-8270 SIM ND(<0 05) MG/KG 8/27/2007 RAL
Benzo(A)Pyrene EPA-8270 SIM ND(<0 05) MG/KG 8/27/2007 RAL
Indeno[1,2,3-Cd]Pyre ne EPA-8270 SIM ND(<0.05) MG/KG 8/27/2007 RAL
Dibenz[A,H]Anthracene EPA-8270 SIM ND(<0 05) MG/KG 8/27/2007 RAL
Benzo[G,H I]Perylene EPA-8270 SIM ND(<0 05) MG/KG 8/27/2007 RAL
NOTE.CHROMATOGRAM INDICATES SAMPLE CONTAINS PRODUCT WHICH IS LIKELY WEATHERED DIESEL FUEL.
OIL RANGE REPORTING LIMIT RAISED DUE TO LOW SAMPLE VOLUME.
'ND'INDICATES ANALYTE ANALYZED FOR BUT NOT DETECTED AT LEVEL ABOVE REPORTING LIMIT.REPORTING LIMIT IS GIVEN IN PARENTHESES.
UMTS FOR ALL NON LIQUID SAMPLES ARE REPORTED ON A DRY WEIGHT BASIS
APPROVED BY
Ai"F--
Page 1
8620 Hotly Drive Suite 100 Everett, WA 99208 425 356-2600 FAX 425 356-2626 Seattle 206 292 9059
Rug 28 07 02 51p Rlkai Consultants 360-613-2408 p 8
- CCI
ANA LYTICA[
� . LABORATORIES
4 01 nrDmaChcm Labomfonm In
CERTIFICATE OF ANALYSIS
CLIENT ALKAI CONSULTANTS LLC DATE 8/28/2007
9465 PROVOST ROAD NW SUITE 202 CCIL JOB#• 0708110
SILVERDALE, WA 98383 DATE RECEIVED, 8/27/2007
WDOE ACCREDITATION#' C142
CLIENT CONTACT SHAWN WILLIAMS
CLIENT PROJECT ID ACL07-08-EO66
CLIENT SAMPLE ID' 8/24/2007 10'35 PA-UST1-SL-02
CCIL SAMPLE# -02
DATA RESULTS
ANALYSIS ANALYSIS
ANALYTE METHOD RESULTS* UNITS- DATE BY
TPH-Diesel Range NWTPH-DX 12000 MG/KG 8/27/2007 EBS
TPH-Oil Range NWTPH-DX ND(<280) MG/KG 8/27/2007 EBS
Naphthalene EPA-8270 SIM 2.6 MG/KG 8/27/2007 RAL
1-Methylnaphthalene EPA-8270 SIM 98 MG/KG 8/27/2007 RAL
2-Methylnaphthalene EPA-8270 SIM 13 MG/KG 8/27/2007 RAL
Acenaphthylene EPA-8270 SIM 0.33 MG/KG 8/27/2007 RAL
Acenaphthene EPA-8270 SIM 054 MG/KG 8/27/2007 RAL
Fluorene EPA-8270 SIM 24 MG/KG 8/27/2007 RAL
Phenanthrene EPA-8270 SIM 3.2 MG/KG 8/27/2007 RAL
Anthracene EPA-8270 SIM 0.59 MG/KG 8/27/2007 RAL
Fluoranthene EPA-8270 SIM 0.34 MG/KG 8/27/2007 RAL
Pyrene EPA-8270 SIM 062 MG/KG 8/27/2007 RAL
Benzo[A]Anthracene EPA-8270 SIM 005 MG/KG 8/27/2007 RAL
Chrysene EPA-8270 SIM 0.17 MG/KG 8/27/2007 RAL
Benzo[B]Fluoranthene EPA-8270 SIM 0.03 MG/KG 8/27/2007 RAL
Benzo[K]Fluoranthene EPA-8270 SIM 005 MG/KG 8/27/2007 RAL
Benzo(A)Pyrene EPA-8270 SIM 0.04 MG/KG 8/27/2007 RAL
Indeno[1,2,3-Cd]Pyrene EPA-8270 SIM ND(<0.04) MG/KG 8/27/2007 RAL
Dibenz[A,H]Anthracene EPA-8270 SIM ND(<0 04) MG/KG 8/27/2007 RAL
Benzo[G,H I]Perylene EPA-8270 SIM ND(<0.04) MG/KG 8/27/2007 RAL
NOTE.CHROMATOGRAM INDICATES SAMPLE CONTAINS PROOUCT WHICH IS LIKELY WEATHERED DIESEL FUEL.
OIL RANGE REPORTING LIMIT RAISED DUE TO LOW SAMPLE VOLUME-
*ND'INDICATES ANALYTE ANALYZED FOR BUT NOT DETECTED AT LEVEL ABOVE REPORTING LIMIT REPORTING LIMIT IS GIVEN IN PARENTHESES.
UMTS FOR ALL NON LIQUID SAMPLES ARE REPORTED ON A DRY WEIGHT BASIS
APPROVED BY
Page 2
8620 Holly Drive Suite 100 Everett, WA 98208 425 356-2600 FAX 425 356-2626 Seattle 206 292 9059
Aug 28 07 02 51p Rlkai Consultants 360-613-2408 p 9
- CCI
LABORATORIES
AD, of D.uCh—Ljb.,af.nn.Inc MII
CERTIFICATE OF ANALYSIS
CLIENT ALKAI CONSULTANTS LLC DATE. 8/28/2007
9465 PROVOST ROAD NW SUITE 202 CCIL JOB#• 0708110
SILVERDALE, WA 98383 DATE RECEIVED 8/27/2007
WDOE ACCREDITATION#- C142
CLIENT CONTACT SHAWN WILLIAMS
CLIENT PROJECT ID ACL07-08-EO66
CLIENT SAMPLE ID- 8/24/2007 1040 PA-USTI-SL-03
CCIL SAMPLE#' -03
DATA RESULTS
ANALYSIS ANALYSIS
ANALYTE METHOD RESULTS' UNITS" DATE BY
TPH-Diesel Range NWTPH-DX 4800 MG/KG 8/27/2007 EBS
TPH-Oil Range NWTPH-DX ND(<480) MG/KG 8/27/2007 EBS
Naphthalene EPA-8270 SIM 10 MG/KG 8/27/2007 RAL
1-Methylnaphthalene EPA-8270 SIM 18 MG/KG 8/27/2007 RAL
2-Methylnaphthalene EPA-8270 SIM 30 MG/KG 8/27/2007 RAL
Acenaphthylene EPA-8270 SIM 0.30 MG/KG 8/27/2007 RAL
Acenaphthene EPA-8270 SIM 085 MG/KG 8/27/2007 RAL
Fluorene EPA-8270 SIM 41 MG/KG 8/27/2007 RAL
Phenanthrene EPA-8270 SIM 44 MG/KG 8/27/2007 RAL
Anthracene EPA-8270 SIM 0.43 MG/KG 8/27/2007 RAL
Fluoranthene EPA-8270 SIM 0.22 MG/KG 8/27/2007 RAL
Pyrene EPA-8270 SIM 0.27 MG/KG 8/27/2007 RAL
Benzo[A]Anthracene EPA-8270 SIM 0.04 MG/KG 8/27/2007 RAL
Chrysene EPA-8270 SIM 0.07 MG/KG 8/27/2007 RAL
Benzo[B]Fluoranthene EPA-8270 SIM ND(<0 04) MG/KG 8/27/2007 RAL
Benzo[K]Fluoranthene EPA-8270 SIM ND(<0 04) MG/KG 8/27/2007 RAL
Senzo(A)Pyrene EPA-8270 SIM ND(<0 04) MG/KG 8/27/2007 RAL
Indeno[1,2,3-Cd]Pyrene EPA-8270 SIM ND(<0 04) MG/KG 8/27/2007 RAL
Dibenz[A,H]Anthracene EPA-8270 SIM ND(<0 04) MG/KG 8/27/2007 RAL
Benzo[G H I]Perylene EPA-8270 SIM ND(<0.04) MG/KG 8/27/2007 RAL
NOTE.CHROMATOGRAM INDICATES SAMPLE CONTAINS PRODUCT WHICH IS LIKELY LIGHTLY WEATHERED DIESEL
FUEL,
OIL RANGE REPORTING LIMIT RAISED DUE TO LOW SAMPLE VOLUME.
'ND'INOICATES ANALYTE ANALYZED FOR BUT NOT DETECTED AT LEVEL ABOVE REPORTING LIMIT REPORTING LIMIT IS OI VEN IN PARENTHESES.
—UNITS FOR ALL NON LIQUID SAMPLES ARE REPORTED ON A DRY WEIGHT BASIS
APPROVED BY
,Al7--
Page 3
8620 Holly Drive Suite 100 Everett, WA 98208 425 356-2600 FAX 425 356-2626 Seattle 206 292 9059
Rug 28 07 02 52p Rlkai Consultants 360-613-2408 p 10
- CCI
ANALYTICA1.
� . LAgORATURIES
A Di soon of UamChem Lafwratones.lnc
CERTIFICATE OF ANALYSIS
CLIENT ALKAI CONSULTANTS LLC DATE 8/28/2007
9465 PROVOST ROAD NW SUITE 202 CCIL JOB #- 0708110
SILVERDALE, WA 98383 DATE RECEIVED 8/27/2007
WDOE ACCREDITATION#- C142
CLIENT CONTACT SHAWN WILLIAMS
CLIENT PROJECT ID ACL07-08-EO66
QUALITY CONTROL RESULTS
SURROGATE RECOVERY
CCIL SAMPLE ID METHOD SUR ID %RECV
0708110-01 NWrPH-DX C25 75
0708110-01 EPA-8270 SIM Terphenyl-d14 98
0708110-02 NWrPH-DX C25 69
0708110-02 EPA-8270 SIM Terphenvkd14 108
0708110-03 NWrPH-DX C25 64
0708110-03 EPA-8270 SIM Terphenvl-d14 93
0708110-04 NWTPH-HCID BCB 103
0708110-04 NWrPH-HCID C25 124
0708110-04 NWTPH-DX C25 86
0708110-05 NWrPH-HCID BCB 103
0708110-05 NWrPH-HCID C25 109
0708110-05 NWTPH-OX C25 117
APPROVED BY
Aiv--
Page
6
8620 Holly Drive Suite 100 Everett, WA 98208 425 356-2600 FAX 425 356-2626 Seattle 206 292-9059
Aug 28 07 02 48p Rlkai Consultants 360-613-2408 p 1
ALKAI CONSULTANTS LLC .
Environmental Engineering • Geotechnical Engineering Wetland Consulting
DATE 9/ 7
Fax Transmittal Sheet
To ✓�•, �w �hs{�ti
Company c l r y
Fax Number- 3 6 0 - 41 l7- g 7,o
9
Regarding Sa •CTj, 5 you o s
From TJb
Number of Pages Including Cover- /6
Comments
we— ' 2S i— �P�,.L„-�1-�- s 4 •,at7 a✓C �1�✓��C s� �I� �c.-� bP s�'��`ti�.o�
C
9465 Provost Road NW Suite 202 • Silverdale Washington 99383 • (360) 613-2407 • Fax (360) 613 2408
08/20/2001 WED 08 16 FXX
FAX TRANSMITTAL
CITY OF PORT ANGELES
ENGINEE WX(;DMS10N
321E5% St
PORT ANGELES,WA 98362
(360)4374411
COMPANY NAME: ' ,&
oo
FA&
CITY/STATS:
� �
DESCSII'' oN:
�J
oe
OF
. G�str-1
NUMBER OF PAGES (INCLUDING COVER SHEET):
RETURN FAX NO. (360)417-4709
IF THERE ART ANY PROBLEMS WITH TRANSMISSION
CALL. (360)4174807
10 d 9161 ZSV 09E 'ON XV. W31SAS I I SNVNI 011VIO WV 50 0 l G3M LOOZ-6Z-0fld
ORT q,Y CITY OF PORT ANGELES 0
DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING IVISION 6�1
321 EAST 5TH STREET PORT ANGELES,WA 98362 i6 0U IAe spa*n
-�2C'' WeSFq e C�
Application Number 06 00001042 Date 6/12/07 JV—
Application pin number 715806
Property Address 123 E FRONT ST —ti�-�_c �a#al pKin s�aees
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000
Tenant nbr name CLALLAM TRANSIT SYSTEM l 1 'd �-7C
Application type description COMM NEW CONST ran% E7� ) lIo J
Subdivision Name (�
Property Use Favi 1�h 1� (5 5 nfo
Property Zoning CENTRAL BUSINESS DISTRICT -too
Application valuation 2717673 C 10(-k To we4- bq F o�
Owner Contractor Wles# Pav-Kin (J� Gava�e J5.) GyZ SF ,e
Clallam Transit System Y Y-�t�D �j�11 la �O H.Y'P IZ •�2J1 s l r 15
830 W Lauridsen Blvd
PORT ANGELES WA 98363 I-To C arks 6/-5 RA
(360) 452 1315 5qv 1m)vjA 983s z
Other struct info TOTAL t LOT COVERAGE 28 50
NUMBER OF STORIES 2 00 (360) 69 3-5447
LOT SIZE 79715 00
PROPOSED LOT COVERAGE 22791 00
TOTAL LOT COVERAGE 22791 00
NUMBER OF UNITS 1 00
Permit BUILDING PERMIT COMMERCIAL
Additional desc
Permit pin number 87494 (�}
Permit Fee 11905 95 Plan Check Fee 7738 87
Issue Date 6/12/07 Valuation 2717673 > W
Expiration Date 12/09/07 /
Qt} Unit Charge Per Extension �)
BASE FEE 5635 25 n Q
1718 00 3 6500 THOU BL 1M + (3 65 PER K) 6270 70
Permit MECHANICAL PERMIT �a
Additiona. desc 6`
Permit pin number 88971 C
Permit Fee 108 20 Plan Check Fee 00
Issue Date 6/12/07 Valuation 0
Expiration Date 12/09/07 �� / C 7
Qty Unit Charge Per Extension Vr f
BASE FEE 50 00 Q /�
1 00 14 7000 ECH ME INSTALL 100- FAU 14 70
6 00 7 2500 ECH ME VENT FAN 43 50 ��ox(Q V• ••il�-
r
Permit PLUMBING PERMIT f�
Additional desc
Permit pin number 88989 1�
Permit Fee 240 00 Plan Check Fee 00 a �•5
/O
Issue Date 6/12/07 Valuation 0
Expiration Date 12/09/07 ^^ ®�1
Qty Unit Charge Per ExtensionL �-
BASE FEE 50 00
23 00 7 0000 ECH PL- EA FIXTURE ON ONE TRAP 161 00
1 00 7 0000 ECH PL EA INSTALL WATER PIPE 7 00
1 00 15 0000 ECH PL EA BLDG SEWER 15 00
Separate Permits are required for electrical work,SEPA,Shoreline ESA,utilities private and public improvements This permit becomes
null and void if work or construction authorized is not commenced within 180 days if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced or if required inspections have not been requested within 180 days from the last
inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of J
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not .s
presume to give authority to violate or cancel the provisions of any sta a or local law regulating construction or the performance of 9'
construction
t/o I-
1-
Signature of Contractor or Authorized Agent Date ig ature of Owner(if owner is builder) Date
T\Policies\1102 15 building permit inspection record05 wpd[1/4/20051
BUILDING PERMIT INSPECTION RECORD
k
CALL 417-4815 FOR BUILDING INSPECTIONS CALL 417-473 FOR ELECTRICAL INSPECTIONS
CALL 417-4807 FOR PUBLIC WORKS UTILITIES
PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAN FUL TO C'OFL'R INSULATE OR CONCEAL ANI'li'ORK EEFORE
INSPECTED AND ACCEPTED POST PERMIT INA CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE.
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO
FOUNDATION:
FOOTINGS
SHEAR WALLS/WALLS
FOUNDATION DILAINAGE DOWN SPOUTS
I
PIERS
POST HOLES(POLE BLDGS.)
PLUMBING
UNDERFLOOR/SLAB
ROUrH-IN
WATER LINE(METER TO BLDG)
GAS LINE FINAL DATE ACCEPTED BY.
BACK FLOW/WATER
AIR SEAL
WALLS
CEILING
FRAMING
JOISTS/ GIRDERS
SHEAR WALL/HOLD DOWNS
W ALLS/ROOF/CEILING
DRYWALL(INTER]OR BRACED PANEL ONLY)
T-BAR
INSULATION
SLAB
WALL/FLOOR/CEILING
MECHANICAL
ROUGH-IN
HEAT PUMP/FURNACE/DUCTS
GAS LINE FINAL DATE ACCEPTED BY.
WOOD STOVE/PELLET/CHIMNEY
MANUFACTURED HOMES
FOOTING/SLAB
BLOCIUNG&,HOLD DOWNS
SKIRTING
PLANNING DEPT SEPARATE PERMIT#'s SEPA.
PARKING/LIGHTING ESA.
LANDSCAPING SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
ELECTRICAL LIGHT DEPT 417-4735 ELECTRICAL
LIGHT DEPT
CONSTRUCTION R.W /PW/ CONSTRUCTION R.W
ENGINEERING 417-4807 PW/ENGINEERING
FIRE 417-4653 FIRE DEPT
PLANNING DEPT 417-4750 PLANNING DEPT
BUILDING 417-4815 BUILDING
T•\Policies\l 102 15 building permit inspection record05.wpd(1/4/20051
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION
321 EAST 5TH STREET PORT ANGELES,WA 98362
Page 2
Application Number 06 00001042 Date 6/12/07
Application pin number 715806
Qty Unit Charge Per Extension
1 00 7 0000 ECH PL EA WATER HEATER 7 00
Special Notes and Comments
This project will require a seperate permit and fire alarm
plans for review
Address numbers shall be plainly visible from the street
Address numbers shall be a minimum of six inches high and be
of contrasting color from the background
Owner is responsible for ongoing fire alarm system
inspection and maintenance per the current addition of NFPA
72
Owner is responsible for ongoing fire sprinkler system
inspection and testing per the current addition of NFPA 25
This project will require seperate permit and fire
sprinkler plans for review
Call for cover inspection for all sprinkler installations A
full acceptance test will be required for all fire alarm
systems
10/03/2006 03 42 PM KDUBUC
A KNOX locking keybox will be required for Fire Department
access Contact the Fire Department at 417 4653 for KNOX
locking keybox ordering and location information
10/03/2006 04 00 PM KDUBUC
10/03/2006 03 43 PM KDUBUC
A fire extinguisher will be required in the elevator
machinery room
10/03/2006 03 44 PM KDUBUC
Contact the Fire Department for recommended fire sprinkler
system FDC locations
10/03/2006 04 01 PM KDUBUC
Fire sprinkler riser rooms must be labeled on exterior
doors
Electrical load calculations and elctrical permits are
required
Sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch 24 hour advance
notice is required
Construct driveway and Sidewalks to City Standards
No concrete with exposed aggregate allowed in the City
road right of way An inspection by Public Works
Engineering is required prior to prouring concrete
Other Fees SEWER SYSTEM DELV CHARGE 6960 00
STATE SURCHARGE 4 50
PW WATER SYSTEM USE FEE 12600 00
Fee summary Charged Paid Credited Due
Permit Fee Total 12254 15 12254 15 00 00
Plan Check Total 7738 87 7738 87 00 00
Other Fee Total 19564 50 19564 50 00 00
Grand Total 39557 52 39557 52 00 QO
Separate Permits are required for electrical work,SEPA,Shoreline ESA,utilities private and public improvements This permit becomes
null and void if work or construction authorized is not commenced within 180 days if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced or if required inspections have not been requested within 180 days from the last
inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction
Signature of Contractor or Authorized Agent Date C &;-gnature of Owner(if owner is builder) Date
T\Policies\1102 15 building permit inspection record05 wpd[1/4/2005]
BUILDING PERMIT INSPECTION RECORD
CALL 417-4815 FOR BUILDING INSPECTIONS CALL 417-4735 FOR ELECTRICAL INSPECTIONS.
CALL 417-4807 FOR PUBLIC WORKS UTILITIES
PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAN FUL TO COVER,IA'SULATE OR CONCEAL 4NY 6f'0RA BEFORE
INSPECTED 4./VD ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT.JOB SITE.
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO
FOUNDATION:
FOOTINGS
SHEAR WALLS/WALLS
FOUNDATION DRAINAGE/DOWN SPOUTS
I I
PIERS
POST HOLES(POLE BLDGS.)
PLUMBING
UNDER FLOOR/SLABS -Q g
ROUGI-I-IN
WATER LINE(METER TO BLDG) �--�
GAS LINE FINAL o 15'O1 DATE �) ACCEPTED Bl'
BACK FLOW/WATER
AIR SEAL
WALLS
CEILING
FRAMING (,0-(0-09-
JOISTS/ GIRDERS 1 r�-�e (0-(3::68,
7t-L
SHEAR WALL/HOLD DOWNS
WALLS/ROOF/CEILING J
DRYWALL(INTERIOR BRACED PANEL ONLY)
T-BAR
INSULATION
SLAB
WALL/FLOOR/CEILING
MECHANICAL
ROUGH-IN --U$ �w
HEATPUMP/FURNACE/DUCTS C /'
GAS LINE FINAL ()o-5-09 DATE � j✓ ACCEPTED BY.
WOOD STOVE/PELLET/CHIMNEY
MANUFACTURED HOMES
FOOTING/SLAB
BLOCIUNG&HOLD DOWNS
SKIRTING
PLANNING DEPT SEPARATE PERMIT#t's SEPA.
PARKING/LIGHTING ESA.
LANDSCAPING SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
ELECTRICAL LIGHT DEPT 417-4735 ELECTRICAL
LIGHT DEPT
CONSTRUCTION R.W /PW/ CONSTRUCTION R.W
ENGINEERING 417-4807 PW/ENGINEERING
FIRE 417-4653 FIRE DEPT
PLANNING DEPT 417-4750 PLANNING DEPT
BUILDING 417-4815 BUILDING
T\Policies\l 102 15 building permit inspection record05 wpd[1/4/2005]
Of pORT,k,O
•^e`�� CITY OF PORT ANGELES
PUBLIC WORKS -UTILITIES DIVISION
321 EAST 5TH-STREET PORT ANGELES,WA 98362
Application Number 06 00001042 Date 6/12/07 C(>''
Application pin number 715806
Property Address 123 E FRONT ST ^1
ASSESSOR PARCEL NUMBER 06 30 00 5 0 0043 0000 \�'
Tenant nbr name CLALLAM TRANSIT SYSTEM
Application type description COMM NEW CONST
Subdivision Name
Property Use
Property Zoning CENTRAL BUSINESS DISTRICT
Application valuation 2717673
Owner Contractor
Clallam Transit System OWNER
830 W Lauridsen Blvd
PORT ANGELES WA 98363
(360) 452 1315
Other struct info TOTAL % LOT COVERAGE 28 50
NUMBER OF STORIES 2 00
LOT SIZE 79715 00
PROPOSED LOT COVERAGE 22791 00
TOTAL LOT COVERAGE 22791 00
NUMBER OF UNITS 1 00
Permit DRIVEWAY INSTALLATION
Additional desc 2 NEW DRIVEWAY OPENINGS
Permit pin number 88674
Permit Fee 340 00 Plan Check Fee 00
Issue Date 6/12/07 Valuation 0
Expiration Date 12/09/07
Qty Unit Charge Per Extension N
BASE FEE 340 00 V
Permit PUBLIC WORKS COMM WATER SERV
Additional desc 2 COMPOUND DROP IN METER
Permit pin number 88658 �7
Permit Fee 1000 00 Plan Check Fee 00 1l '
Issue Date 6/12/07 Valuation 0
Expiration Date 12/09/07
Qty Unit Charge Per Extension
BASE FEE 1000 00
Permit PUBLIC WORKS COMM WATER SERV
Additional desc 1 LANDSCAPE DROP IN METER
Permit pin number 88666
Permit Fee 250 00 Plan Check Fee 00
Issue Date 6/12/07 Valuation 0
Expiration Date 12/09/07
Qty Unit Charge Per Extension
BASE FEE 250 00
Permit RIGHT OF WAY
Additional desc
Permit pin number 88682
Permit Fee 50 00 Plan Check Fee 00
Issue Date 6/12/07 Valuation 2717673
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
fora period of 1-80 days after the work as commenced,or if required inspections have not been requested within 1'80 days from.the last
inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any sta a or local law regulating construction or the performance of
construction. nn
Signature of Contractor or Authorized Agent Date n ure of Owner(if owner is builder) Date
T-\Policies\1102.15R[1/051
PERMIT INSPECTION RECORD
CALL 417-4807 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO
PW UTILITIES (Engineering Division)
WATERLINE/METER
SEWER CONNECTION
SANITARY
STORM
SITE DRAINAGE
SITE EROSION CONTROL
PARKING
SIDEWALK
CURB&GUTTER
DRIVEWAY APPROACH
BACK-FLOW DEVICE
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
CONSTRUCTION R.W /PW/ CONSTRUCTION RW
ENGINEERING 417-4807 PW/ENGINEERING
FIRE 417-4653 FIRE DEPT
PLANNING DEPT 417-4750 PLANNING DEPT
BUILDING 417-4815 BUILDING
T-\Policies\1102.15R[1/05]
t+pf pORT,k.Q CITY OF PORT ANGELES
cT T��W
PUBLIC WORKS -UTILITIES DIVISION
321 EAST 5TH STREET PORT ANGELES,WA 98362
Page 2
Application Number 06 00001042 Date 6/12/07
Application pin number 715806
Expiration Date 12/09/07
Qty Unit Charge Per Extension
1 00 50 0000 ECH RIGHT OF WAY PERMIT 50 00
Permit SANITARY SEWER HOOK UP
Additional desc
Permit pin number 88641
Permit Fee 990 00 Plan Check Fee 00
Issue Date 6/12/07 Valuation 2717673
Expiration Date 12/09/07
Qty Unit Charge Per Extension
1 00 110 0000 EA SAN SEWER HOOKUP 110 00
16 00 55 0000 EA STORM DRAIN C/B 880 00
Special Notes and Comments
This project will require a seperate permit and fire alarm
plans for review
Address numbers shall be plainly visible from the street
Address numbers shall be a minimum of six inches high and be
of contrasting color from the background
Owner is responsible for ongoing fire alarm system
inspection and maintenance per the current addition of NFPA
72
Owner is responsible for ongoing fire sprinkler system
inspection and testing per the current addition of NFPA 25
This project will require seperate permit and fire
sprinkler plans for review
Call for cover inspection for all sprinkler installations A
full acceptance test will be required for all fire- alarm
systems
10/03/2006 03 42 PM KDUBUC
A KNOX locking keybox will be required for Fire Department
access Contact the Fire Department at 417 4653 for KNOX
locking keybox ordering and location information
10/03/2006 04 00 PM KDUBUC
10/03/2006 03 43 PM KDUBUC
A fire extinguisher will be required in the elevator
machinery room
10/03/2006 03 44 PM KDUBUC
Contact the Fire Department for recommended fire sprinkler
system FDC locations
10/03/2006 04 01 PM KDUBUC
Fire sprinkler riser rooms must be labeled on exterior
doors
Electrical load calculations and elctrical permits are
required
Sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch 24 hour advance
notice is required
Construct driveway and Sidewalks to City Standards
No concrete with exposed aggregate allowed in the City
road right of way An inspection' by Public Works
Engineering is required prior to prouring concrete
Other Fees SEWER SYSTEM DELV CHARGE 6960 00
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
fora period'of 180 days after the work as commenced,or if required inspections have not been requestedwithin-1'80 days from the last'
inspection I hereby certify that I have read and examined this application and know the same to be true and correct. All.provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authorized Agent Date ft4ure of Owner(if owner is builder) Date
T•\Po1icies\1102.15R[1/05]
PERMIT INSPECTION RECORD
CALL 417-4807 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. ITIS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO
PW UTILITIES (Engineering Division)
WATERLINE/METER
SEWER CONNECTION
SANITARY
STORM
SITE DRAINAGE
SITE EROSION CONTROL
PARKING
SIDEWALK
CURB&GUTTER
DRIVEWAY APPROACH
BACK-FLOW DEVICE
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
CONSTRUCTION R.W /PW/ CONSTRUCTION RW
ENGINEERING 417-4807 PW/ENGINEERING
FIRE 417-4653 1 FIRE DEPT
PLANNING DEPT 417-4750 PLANNING DEPT
BUILDING 417-4815 BUILDING
T•\Policies\I102.15R(1/051
_.
``�"'""� CITY OF PORT ANGELES
PUBLIC WORKS UTILITIES DIVISION
321 EAST 5TH STREET PORT ANGELES,WA 98362
Page 3
Application Number 06 00001042 Date 6/12/07
Application pin number 715806
Other Fees STATE SURCHARGE 4 50
PW WATER SYSTEM USE FEE 12600 00
Fee summary Charged Paid Credited Due
Permit Fee Total 2630 00 2630 00 00 00
Plan Check Total 00 00 00 00
Other Fee Total 19564 50 19564 50 00 00
Grand Total 22194 50 22194 50 00 00
Separate.Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements.This permit becomes
null and void if work or construction authorized is not commenced.within 180 days,if construction or work is suspended or abandoned
for a period'of 180 days after the work as commenced,or if required inspections have not been requested within 1'80 days from.the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authorized Agent Date jn �ureolf Owner(if owner is builder) Date
T•\Policies\I 102.15R i 1/05]
r
PERMIT INSPECTION RECORD
CALL 417-4807 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO
PW UTILITIES (Engineering Division)
WATERLINE/METER
SEWER CONNECTION
SANITARY
STORM
SITE DRAINAGE
SITE EROSION CONTROL
PARKING
SIDEWALK
CURB&GUTTER
DRIVEWAY APPROACH
BACK-FLOW DEVICE
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
CONSTRUCTION R.W /PW/ CONSTRUCTION RW
ENGINEERING 417-4807 PW/ENGINEERING
FIRE 417-4653 FIRE DEPT
PLANNING DEPT 417-4750 PLANNING DEPT
BUILDING 417-4815 BUILDING
T-\Policies\l 102.15R[11051
CIVIL ENGINEERING
E N 0 V I C RECEH � � .ED
LAND SURVEYING
301 East 6th Street,Suite 1
& ASSOCIATES FEB 2 0 2007 Port Angeles,Washmgton 98362
INCORPORATED (360)417-0501
CITY OF PORT ANGELES Dept.of community otw@lopmdnt Fax(360)417-0514
E-mail:zenovic@olympus.net
PORT ANGELES INTERNATIONAL GATEWAY TRANSPORTATION CENTER
PORT ANGELES,WASHINGTON
FIRST STRUCTURAL PLANCHECK— November 30, 2006
Note.
The designer is to address each item of the plancheck notes in his or her letter of
response. The designer is also to place a cloud' around all changes so that compliance
may be verified
Notes that are preceded by an asterisk are general comments that require no change to
plans.
Notes.
1 Three complete revised full sized set of plans incorporating all changes and
addendums shall be provided to the City of Port Angeles Building Department
for final review and approval. Documents shall include two complete set of
structural calculations incorporating all revisions. All documents shall be wet (�
stamped by appropriate design professional licensed in the State of
Washington.
"'2. Special inspections required on this project per U B.0 Section 1700 Inspection "1
program shall be submitted to the City of Port Angeles Building Department for
review and approval Submit proposed inspection program including names and
qualifications of all inspectors and timing for inspections. Copies of all inspection
reports to be submitted to the City of Port Angeles Building Department. The items
requiring special inspections are noted on Sheet SO 01 of the plans. Special
inspections shall include monitoring of pile driving operations. cL
3. Based on the roof layout shown on the Transit Building it appears that rafters may t
not align with the interior shear walls. Although it is noted that Details A& B Sheet
S2.08 do denote a rafter and/or blocking on the plans the Roof Framing Plan shall be
revised to clearly show additional rafters aligning with the interior shear walls which
are parallel to the rafters since the walls do not match the 24" layout on the rafters
4 Final structural plans and any revised calculations for revisions to clock tower shall
be included in final sets of plans and documents submitted for review and approval
as noted in Item #1 above.
5 Building permit application shall be revised as necessary to clearly indicate which
structures are to be constructed as part of this project(i.e. pavilion, clock tower
etc.)
Page 2
6 Copies of monitoring reports for adjacent buildings which are to be performed by
the contractor during pile driving shall be submitted to the City of Port Angeles
Building Department. The City of Port Angeles Building Department shall be
notified of any damage to adjacent buildings caused by pile driving activity
I
CML ENGINEERING
LAND SURVEYING
JEN 0 V I C`
& ASSOCIATES 110t
301 East 6th Street,Suite 1
Port Angeles,Washmgton 98362
INCORPORATED (360)417-0501
Fax(360)417-0514
E-mail.zenovic@olympus.net
PORT ANGELES INTERNATIONAL GATEWAY TRANSPORTATION CENTER
PORT ANGELES, WASHINGTON
FIRST STRUCTURAL PLANCHECK— November 30, 2006
Note-
The designer is to address each item of the plancheck notes in his or her letter of
response. The designer is also to place a cloud' around all changes so that compliance
may be verified.
Notes that are preceded by an asterisk are general comments that require no change to
plans.
Notes.
1 Complete revised full sized plans shall be submitted to the building department for
final review and approval These final plans shall incorporate addendum changes
where revised plans were not provided
"2. Special inspections required on this project per U B.0 Section 1700 Inspection
program shall be submitted to the City of Port Angeles for approval Submit
proposed inspection program including names and qualifications of all inspectors
and timing for inspections Copies of all inspection reports to be submitted to the
City of Port Angeles. Please note that all pile driving will also be required to be
monitored
3 Please justify why retaining wall footings Detail B and C/S2.02 do not have pile
footing
4 Sheet S1 01 calls out for 4 foot wide by 2' deep cap beam while Detail A/S2.02 calls
out for a 1 —6" deep cap beam. Please clarify
5 The plywood shown on Details 1 and 3/S2.06 shall be pressure treated where
against concrete. Revise plans to reflect this requirement.
6 Shear wall schedule calls out LPT4 clips while details on Sheet S2.08 call out for
A35F clips. Please clarify plans.
7 How are roof diaphragm loads transferred to shear walls parallel to rafters at the
Transit Building? It appears that rafters may not align with the parallel shear walls.
8 Structural calculations (Section 4)do not appear to match transit building shown on
the plans. Provide calculations to match submitted plans.
9 Please justify parapet connections at the transit building It appears there is nothing
to resist outward rotation of the parapet wall Provide calculations and revised plans
as necessary
10 There appears to be no connection between the pile and cap and cap and
footings for the transit building shown on Detail 1/S2 06
11 On Sheet S1 05 please clarify why there are no upper and lower `W' beams
called out along Grid Lines 2 and 3 at one of the bays. The same brick facade
appears on the architectural plans but it appears that the beams are there to provide
support as shown on Detail C/S2.08
12 On Sheet BS1 02 please clarify the Diaphragm plan There are two Zone B's in
the table with different panel thicknesses. Please revise plans to match
requirements of structural calculations.
13 Page 3 006 of structural calculations appears to require 15/32' diaphragm
sheathing while plans call for 7/16' sheathing, please clarify
14 Page 3 008 of structural calculations appears to require a 4 x 12 plate with 3/'
diameter anchor bolts. Please clarify where this requirement is located on the
plans.
15 Please clarify location of structural details for the cmu walls shown in calculations
on Page 3 007 There do not appear to be any details for structural cmu walls in
the plans.
16 The 2 foot sump shown on the foundation and pit plan Sheet S4 01 appears to
conflict with the pile Please review and modify plans as necessary
17 Please clarify how piles tie into the pile cap at the elevator Provide details of
connection
18 Calculations on Page 7 007 appear to require#6 reinforcing bars at the heal with a
spacing not to exceed 10 74 inches while the plans call for#6 reinforcing bars at
12' o c. Please clarify
19 Verify thickness of concrete wall shown on Detail A, Sheet S2.02. The wall
thickness is not shown on this detail
20 Structural plans have not been provided for the clock tower If the clock tower is to
be constructed please provide structural plans for review
21 Please clarify whether plinths for clock tower and pavilion are being constructed as
part of the base bid or if they are an alternate If not installed as part of base bid
how will they be attached to the post tensioned slab?
22. Geotechnical report recommends monitoring neighboring building for potential
damage from driven piles. How is this being addressed in the plans and
specifications for this project?
C
C* L L I NS ARCHITECTURE PLANNING INTERIOR DESIGN
M
70
3 710 SECONOAVENUE SUITE 1400
DSEATTLE WASHINGTON 98104-1710
Z T 2062452100 F 2062452101 CO.LINSWOEHMAN COM
TRANSMITTAL
DATE 12/4/06
TO ® JIM PAPKE ® LYLE ADCOCK
Olympic Medical Center AWA Electrical Consultants
939 Caroline Street 1901536 1h Ave W Suite E
Port Angeles WA 98362-3997 Lynwood,WA 98036
® DAVID GONZALES ® PERMIT INTAKE
Degenkolb Engineers City of Port Angeles
720-3rd Ave,Suite 1420 321 East 5th Street
Seattle,WA 98104 Port Angeles, WA 98362
® RICK PETERS ® PERMIT INTAKE
TBS Engineering,Inc. Department of Health
7302 Pearl Ct. 2725 Harrison Ave NW Suite 500
Bainbridge Island,WA 98110 Olympia,WA 98504
FROM • ❑ Marguerite Jamieson REGARDING • Permit Plans
® Grant Faust
PROJECT• Olympic Medical Center PROJECT NUMBER • 06047
®Attached ❑Under separate cover via the following items:
®Drawings ®Specifications ❑Shop Drawings ❑Product Data ❑Samples ❑Change Order
❑Letter ❑Application for Payment ❑Other
- SM, w � '
❑For approyal ®For your use ❑As requested ❑For review and comment
❑Approved as submitted ❑Approved as noted ❑Rgturned for corrections ❑For review
COPIES DATE j DESCRIPTION
j 1 (_ 11/24/06 —T Plans
1 11/24/06 j Specifications
i I
r
Team,
i
Please find attached the permit plans and specifications for your use I have
provided 1 set to you and 2 sets to DOH?and the City of Port Angeles
I
i I
i
Thank you,
Grant Faust i
i
CO P I E S SENT V I A T FACSIMILE
i
� . ,_.COURIER ®! POST_ { Q` ELECTRONIC !
C 0 L L I N S W 0 E R M A N I S A W A S H I N G T 0 N C 0 R P 0 R A T 10 N G:\AG\06047 OMC 923 Georgian\01 Correspondence\Corr Templates\06047 transmittal 1
Jambs Li�rly Electrical Responses to Energy Review Comments Page 1
From 'Stan Cruse <scruse@parametrix.com>
To <Jlierly@cityofpa.us> <Jmahlum@cityofpa.us>
Date 11/22/06 11 44AM
Subject: Electrical Responses to Energy Review Comments
Attached are the review comment responses to the Lighting items
Krei Architecture A Parametrix Company
Stan Cruse, A.I.A. LEED v.2 A.P
Corporate Architect
scruse@kreiarchitecture us
scruse@parametrix.com
Parametrix Bremerton Office r
4660 Kitsap Way Suite A
Bremerton Washington 98312
Phone 360-850-5313 Direct
Fax: 360 479 5961
CC <gkenworthy@cityofpa.us>
q�
l
VA
r1
c ific-a tion R I e I y_ _'f6r"'Re' "' 'fl' 1;0,-- en,i'
r do'
Y_ Tpa i
Energy Specification Review for International Gateway Transportation Center
Lightin —Section 16500
0 Plan exceeds Washington State Energy Code Lighting Power Density in Public
Bathrooms (Specifications are higher than needed)
RESPONSE
According to 51-11 WAC Section 1531 the building may be calculated by
multiplying the gross interior floor area by its primary use The rule
also states Accessory uses including corridors lobbies and toilet
facilities shall be included with the primary use
Energy calculations are in compliance and do not recommend reducing the
lighting level in these rooms
Vandal Proof light fixtures per plan in all 4 restrooms. Although necessary in Public
Restrooms,the vandal proof fixtures may not be needed in the office restrooms.
RESPONSE
Suggest maintaining specified fixtures Please provide clear direction
if non-vandal resistant fixtures are desired
0 Some additional lighting energy savings may be incorporated by specifying high
perfon-nance ballast lamp combination in troffer fixtures (see attached lighting audit)
RESPONSE
This recommendation will create a possible proprietary design standard that could result in reducing
competition.
0 Incorporate minimum Color Rendering Index (CRI)requirement of 85 into plan for
fluorescent lighting.
RESPONSE
This suggestion will be included in the next document revision
`-
WASHINGTON, U S A
MEMO DATE October 27, 2006
COMMUNITY
& TO Glenn Cutler
ECONOMIC
DEVELOPMENT FROM Scott K. Johns, Associate Planner
Mark Madsen
City Manager RE Landscaping requirements for Gateway project
417-4501
Sue Roberds The Department of Community and Economic Development has reviewed the
Planning Manager landscaping plans for the Gateway project. The number of trees proposed for
417-4750 the Gateway meets the existing requirement for the number of exposed parking
spaces (those under the deck were not included in the calculation)
Nathan West
Principal Planner Mr Mike Mills, the Certified Arborist who visited with staff on Monday
417-4751 recommended that the areas shown on the landscape plan using 'structural soils'
be increased in area to extend the full length of the new sidewalk adjacent to
Scott Johns Lincoln Street. Expanding the areas of structural soils on Front Street where
Associate Planner
417-4752 planter boxes with trees would benefit from additional root zone area was also
recommended.
Jim Lierly Regarding the design/build parking structure, CED staff with direction of the
Building Inspector
417-4816 City Manager, intends to establish an example of providing 1 tree for each
group of five parking spaces. A total of 58 parking spaces are shown on the
Dave Yasumura plan(AA1 01) This calculates to a requirement of 12 trees to be included in
Permit Technician the design of the parking structure (again, only parking spaces on the exposed
417-4815 level were included in the calculation)
Patrick Bartholick I have discussed the location of these 12 trees with other staff and Charlie
Compliance Officer Smith of Lindberg and Smith Architects. It is the consensus of these
417-4712 discussions that the 12 trees should be located on the east side of the structure
Fax: 360-417-4711 to help screen the structure, and should be planted using the same standards as
other street trees in the Central Business District. The use of structural soils for
the sidewalk area on the east side of the parking structure is also highly
recommended.
Due to limited space along the east side of the structure, the use of fastigate or
columnar varieties of trees is recommended. Should you have difficulty
achieving suitable locations for all 12 required trees, alternatives that mitigate
this requirement may be considered. The department's primary concern is to
soften the hard lines of the proposed structure and to set an example for the
community of how the generous use of landscaping can contribute to the
quality of the City
Some suggested alternatives may include,
• The use of vines or other vegetation on the structure to soften the lines,
Distributing some of the required trees to the east side of the transit access lane
where a wider pedestrian area exists.
Planning Division staff will be available if you have further questions or concerns regarding this
requirement.
Thank you
PEN I:I SUL_. D, T;. I` E,W1; ^•f f t C F jf'} 'l i ;.t. r--T-1
I Y f 'I�� �_'?i_ IJ Y:.' i,G d; fii c7'^�' ig ,i n 'I- a 1'
.Pen Ti._U la Da .I y New ---
_.._._.__ CITY OF PORT ANGELES
NOTICE _.
-- -- ----- - -- --- -------- -- - ---- DETERMINATION OF ------
L A t.CT i,11'Y C,L%E:11 COMPLETENESS
NOTICE OF DEVELOP-
T Y D I-'0F I A N CzE.LE•=i I MENT APPLICATION
-__.-_f-Y,_� - iL •._). _- - -- -__. �T_- NOTICE IS HEREBY GIVEN
that on September 27 --
1' :}'hi•IGS.LES ...• WA 9`96 2006, the City of Port An=
l geles received a State Envi-
ronmental Policy Act (SEPA)-
_-___—_ checklist for review in assn-
- -` -1`---- ciation with the
"-,)=-T F1 1x11" . • , '? #1. I
ment of a bus transfer sta-
. ;ri•I c t tion facility and parking fa-
I._ -• '7 c.x 4sc r.'I I. .0 et fi7 'i"T_'sa i i ? �: I: f. cility in the CBD Central
Business District zone. The,
application was determined
1 he.e u n d e r ni-i.C T ed be i Ti g f i'r a:j d u-1-y S OJ O r h On C,a-t 1a ; to be..complete on Septem-
ber 27 2006. Interested
U r `� `I ' y. I parties are encouraged to
-.LL? -5S'_e_:h a i _ 31Jli11T?..x:-ed- :[37 1 C1-C}i: -ti?:71�e- iT --1--- comment on the proposal _ ---and may request a copy of
-�•F f I,d o 1.'L'. f O Ta Tri d on b e h a.I. -F o f P en 1 n V U.I.a �u 1. 1.y � the decision once it's been
made. The application and
N f�?ill O 3' :)n 1":7'� 1 O n a 7'i d !;h t I?£: f G 1. l I Lt1].Y7 t: I any studies may be re-
viewed at the City art-
- vid De p -- - -- ---
ment of Community & Eco-
ar.d a(7 u '1 I..r?ut'lledr-
+�_ I nomic Development. No
public hearing will be con-
ducted on the SEPA check-
_ i-h-a t rt rf C'rf (x_5 3 # list. A decision will be --
made based on the record
C,f F'e • r? "i s J 1 a D a 1 t,t )'' e w s I,}L.h 1 i s)"1 a dl -i r I including-any written public
com-
1cY1. pro'-c)tT); )E' f-fe1 ' oa1 CC.Ur?'I.:2eS anu � :I h ' been ap e�o s
ed I menemust berttten submtt•d
f
(1-- '- --h--ti--�3 T-i1-ae�"--11-'
W . .'om . - - to the City Department of
Community& Economic De-
COL, ---- ----
t o.wsaid (-1alla. t1erfe S 01 11 +••O-U Ti t LI: Of the I velopment, 321 East Fifth
StP.O. Box 1150 Port An-
`"'u a#=E�. i_s' .k1: ' 1' i r.?. 6. O T` 3 ge.les, Washington, 98362,
-_%:-._� 1; ? r;t; r_nr jam, .. } I; d-pr;t of ,rl .i -- �_ no later than October 23, --
2006.
ir- 'I:•iC:rl a 1't: Was put) l2s1"ted 3n regular 1sT#It_r I STATE ENVIRONMENTAL
( a w u r.i o; � -• POLICY ACT It is anticipat-
t =u 1- I` e m e i' o f f i O • "a i u ';c.i£-I S D c��i=T' I ed that a determination of
•i;r•i h.,1'.s
Si-u-a C-7 1. i e i �-„ - ---- non significance (DNS) will
be issued for the proposal
CI.t t r?,T?CI R.1 1 C'4, :.i a!d p'e r i o dT'h'I? i7 U.b l.j, h. 't f; u a",( e j. per WAC 197 11340(2)fol-
4_ lowing the public comment
d 1.w 's,I'?e i s iq t day f P U b'I i cL i,on period which ends October
_ 23,2006.
APPLICANT Clallam Transit--_--- -� ---
I System
LOCATION: 123' E. Front
I Street
For further information con-
-----_._ .-- I----- -- tact: Scott Johns, (360)----------.-'- --
I 417-4752
Pub:Oct.1,2006
ism-#- C?N 1.0 01 I, —
I
I
Tr3l'Al C1'3ST 57 95 -1
_F:ll:I_-T_•,D' Qrel.,— 10-t 01/,OA
atJbsc-ribcd and susorn to before me thi _ day of C')(/�?. _ IIII�i�1ii.
;a.r y P iJ b 1.a c i and f c�r .b h e a t c3 t.e o f .W a s.h i n t.o n r.e s.i d i n t a.t r a 116ttOiT/ j 'A
Flen:i.nsula Eaily 1`4ews P 0 Dox 1330 Port Angeles, WA (n, AS-05-OG =`
�,A UBIN O,
/����OP I I i ASN
City of Port Angeles
Community Developement (Building Division)
321 E 5th St
Port Angeles Washington 98362
360-417-4815/ Fax 417-4711
Plan analysis based on
the 2003 International Building Code
Project Number 06-1042 Date September 27 2006
Project Name Gateway transportation center
Address 123 E Front Street
Contractor TBA
Occupancy S-2 Architect Krei architecture
Construction IV Engineer Ade J Bright PE
Report By JIM LIERLY
NOTE The code items listed in this report are not intended to be a
complete listing of all possible code requirements in the 2003 IBC
It is a guide to selected sections of the code
Report created using Plan Analyst software by IHS Global 800-854-7179
PROPERTY DESCRIPTION
EXTERIOR WALL FIRE RATINGS AND OPENING PROTECTION
Sec 602 Tables 601 and 602 and Sec 704
North Side has a property line - Distance to property line = 20 0
Minimum fire rating Bearing =2-hour - Nonbearing =1-hour
A parapet wall is required on this wall See exceptions
There is no limit to unprotected openings in this wall
There is no limit to protected openings in this wall
Length of openings per tier = 50 feet
Area of openings per tier = 300 feet
East Side has a property line - Distance to property line = 0 0
Minimum fire rating Bearing =2-hour - Nonbearing =1-hour
A parapet wall is required on this wall See exceptions
Unprotected openings are not permitted in this wall
Protected openings are not permitted in this wall
There are no openings in this wall
South Side has a property line - Distance to property line = 0 0
Minimum fire rating Bearing =2-hour - Nonbearing =1-hour
A parapet wall is required on this wall See exceptions
Unprotected openings are not permitted in this wall
Protected openings are not permitted in this wall
There are no openings in this wall
d
Page # 2
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
West Side has a property line - Distance to property line = 0 0
Minimum fire rating Bearing =2-hour - Nonbearing =1-hour
A parapet wall is required on this wall See exceptions
Unprotected openings are not permitted in this wall
Protected openings are not permitted in this wall
Length of openings per tier = 1 feet
WARNING Openings are not allowed in this wall
The exterior walls are required to be of NONCOMBUSTIBLE material
-- Sec 602 4
Exterior walls are required to be fire-rated for exposure to fire
1 From Both sides when fire separation is 5 feet or less
2 On the interior side only when separation is greater than 5 feet
-- Sec 704 5
The area of openings in an open parking structure with a fire
separation distance of greater than 10 feet shall not be limited
-- Table 704 8 note c
Then maximum percent of area of unprotected opening has been
adjusted for an automatic sprinkler system -- Sec 704 8 1
If some openings are protected and some are not then use formula
in Sec 704 8
Openings in lhr walls are required to be protected with
3/4 hour assemblies -- Sec 704 12 and 715 4 8
Openings in walls required to be greater than lhr are required
protected with 1 1/2 hour assemblies -- Sec 715 4 8
When a parapet wall is required the parapet wall shall extend 30
inches above the roofing The parapet wall is required to have
inches same fire rating as the wall and shall have noncombustible
faces for the uppermost 18 inches -- Sec 704 11
Exceptions
The parapet wall is not required where
1 The roof is construction is at least 2 hour fire resistive
2 The roof including the deck and supporting construction is
constructed entirely of noncombustible materials
3 Exterior wall is required to be 1 hour fire resistive and
where the roof is constructed per Exception 4
(1 hour roof/ceiling, no openings in the roof near the exterior
wall and Class B covering)
Page # 3
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
Open parking garage description
1 Design based on parking structure having an automatic sprinkler
system per NFPA 13
2 Design based on all areas of garage being within 200 feet
of an exterior opening
3 Public has access to all levels
5 Garage has an office/waiting area on the grade level
Note The combined area of an office, waiting and/or toilet rooms
cannot exceed 1000 square feet -- Sec 406 3 5 1 Exception
Use is limited to the parking or storage of private motor vehicles
-- Sec 406 3 5 1
The following uses are not permitted -- Sec 406 3 13
1 Vehicle repair work
2 Parking of buses, trucks and similar vehicles
3 Closing of required openings by tarpaulins or any other means
4 Dispensing of fuel
Garage has 22791 sq ft per tier
The allowed area per tier is 50000sq ft
-- Sec 406 3 5 and Table 406 3 5
The area per tier is within the allowed area
Garage has 1 tier
The allowed number of tiers is 4
-- Sec 406 3 5 and Table 406 3 5
The number of tiers is within the allowed
Warning! The minimum number of openings in at least 2 exterior walls
is not provided -- Sec 406 3 3 1
Note The aggregate length of openings are less than 40 percent of
the perimeter of tiers A mechanical ventilation system is
required -- Sec 406 3 3 1
FIRE RESISTANCE RATINGS FOR BUILDING ELEMENTS -- Table 601
ELEMENT MATERIAL RATING NOTES
Structural Frame Heavy Timber H T
Interior Bearing wall Heavy Timber 1 hr/H T
Interior nonbrg wall Heavy Timber 1 hr/H T
Floor/Ceiling Assembly Heavy Timber H T Note 12
Roof/Ceiling Assembly Heavy Timber H T Note 12
NOTES
12 Floors shall be without concealed spaces -- Sec 602 4 4
Roofs shall be without concealed spaces -- Sec 602 4 5
Page # 4
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
EXIT REQUIREMENTS
Tiers with public access
The number of occupants per tier is 114
Each tier must have at least 2 exits
-- Sec 1014 1 & 1018 1
Note Travel distance limits may require additional exits
Doors are required to swing in the direction of egress travel
-- Sec 1008 1 2
EXIT ACCESS TRAVEL DISTANCE
The maximum travel distance in a parking garage is 400 feet -- Table 1015 1
EXIT NOTES
Occupant load is based on Section 1004 1 and Table 1004 1 2
For the minimum width of doors see Section 1008 1 1
Exits shall be continuous from the point of entry into the exit to
the exit discharge -- Sec 1003 6
Vehicle ramps shall not be considered as providing required exit
facilities -- Sec 406 2 5
EXIT SEPARATION
In areas where 2 exits are required the minimum separation is 1/3 of
the maximum diagonal of the area or floor measured in a straight line
between exits or exit access doorways -- Sec 1014 2 1 Exception 2
Multiple means of egress shall be sized such that the loss of any one
means of egress shall not reduce the available capacity by more than
50 percent -- Sec 1005 1
EXIT SIGNS
Exits and exit access doors shall be marked by an approved exit sign
Signs shall be placed where the exit or the path of egress travel is not
immediately visible No point to be more than 100 feet from an exit sign
-- Sec 1011 1
Exception 1 Exit signs are not required in rooms or areas which require
only one exit
Exception 2 Main exterior exit doors which obviously and clearly are
identifiable as exits need not be signed when approved
Exit signs shall be internally or externally illuminated
-- Sec 1011 2
Exit sign shall be illuminated at all times including during loss of
primary power -- Sec 1011 4 & Sec 1011 5 3
Page # 5
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
BOLT LOCKS
Manually operated flush bolts and surface bolts are not permitted
-- Sec 1008 1 8 4
Exception 2 Where a pair of doors serves a storage or equipment room
manually operated edge- or surface-mounted bolts are
permitted on the inactive leaf
LOCKS AND LATCHES
Egress doors shall be readily openable from the egress side without the
use of a key or any special knowledge or effort -- Sec 1008 1 8
Locks and latches shall be permitted to prevent operation where any
of the following exists
Exception 2 The main door or doors in Group B F M and S areas are
permitted to be equipped with key operating locking devices
from the egress side provided
2 1 The locking device is readily distinguishable as locked
2 2 A readily visible durable sign is posted on the egress
side stating THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING
IS OCCUPIED
Exception 3 Where egress doors are used in pairs automatic flush bolts
shall be permitted to be used provided the door leaf having
the automatic flush bolts has no doorknob or surface-mounted
hardware
LANDINGS AT DOORS
1 There shall be a floor or landing on each side of a door
-- Sec 1008 1 4
2 Such floor or landing shall be at the same elevation on each
side of the door -- Sec 1008 1 4
3 The floor or landing shall not be more than 1/2 inch lower than the
threshold -- Sec 1008 1 6
4 Landings shall have a width not less than the width of the stairway
or width of the doorway whichever is the greater Where a landing
serves an occupant load of 50 or more doors in any position shall
not reduce the landing dimension to less than one half it required
width The minimum length in the direction of exit travel is 44
inches -- Sec 1008 1 5
5 The space between two doors in series shall be 48 inches plus the
width of door swinging into the space -- Sec 1008 1 7
Page # 6
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
STAIR REQUIREMENTS
Public Stairways
1 The riser heights shall not be less than 4 inches or greater than 7
inches The minimum tread depth is 11 inches -- Sec 1009 3 The
maximum variation is 3/8 inch between the largest and the smallest
in a stairway flight -- Sec 1009 3
2 Public Stairways The minimum width of a stairway is 36 inches
44 inches if the occupant load is greater than 50
-- Sec 1009 1
3 Provide a handrail on each side of stairways -- Sec 1009 11
Handrail height measured above stair tread nosing shall be not
less than 34 inches and not more than 38 inches -- Sec 1009 11 1
Handrails with a circular cross section shall have an outside diameter
of at least 1 1/4 inches and not greater than 2 inches or shall
provide equivalent graspability -- Sec 1009 11 3
Handrail-gripping surfaces shall be continuous without interruption
by newel post or other obstructions -- Sec 1009 11 4
Handrails shall return to a wall guard or the walking surface or
shall be continuous to the handrail of an adjacent stair flight
Where handrails are not continuous between flights the handrails
shall extend horizontally at least 12 inches beyond the top riser
top riser and continue to slope for the depth of one tread beyond
the bottom riser -- Sec 1009 11 5
4 Open sides of walking surfaces which are located more than 30 inches
above the floor or grade below are required to have a guard
-- Sec 1012 1
5 The minimum height of guard is 42 inches -- Sec 1012 2
6 Open guards shall have balusters or ornamental pattern such that
a 4-inches diameter sphere cannot pass through any opening up to a
height of 34 inches From a height of 34 inches above the adjacent
walking surface to 42 inches above the walking surface a sphere
8 inches in diameter shall not pass -- Sec 1012 3
Exception 1 The triangular opening formed at the riser tread and
guardrail may be 6 inches
7 The minimum headroom clearance is 80 inches (6 ft - 8 inches )
measured vertically from a line connecting the edge of the nosing
Headroom shall be continuous to the point where the line intersects
the landing below The minimum clearance shall be maintained the full
width of the stairway and landing -- Sec 1009 2
8 Enclosed usable space under the stairs is required to be protected
by 1-hour fire-resistive construction or the fire-resistance rating
of the stairway enclosure whichever is greater -- Sec 1019 1 5
9 A flight of stairs shall not have a vertical rise greater than 12 feet
between floor levels or landings -- Sec 1009 6
Page # 7
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
ELEVATOR REQUIREMENTS
1 An approved pictorial sign of a standardized design shall be posted
adjacent to each elevator call station on all floors instructing
occupants to use the exit stairways and not to use the elevators
in case of fire -- Sec 3002 3
1104 4 Multilevel buildings and facilities
At least one accessible route shall connect each level
including mezzanines in multilevel buildings and facilities
EXCEPTION
1 An accessible route is not required to stories and mezzanies
above and below accessible levels that have an aggregate area
of not more that 3 000 S F This exception does not apply to
1 1 Muliti tenant facilities of group M occupancies containing
five or more tenant spaces
1 2 Levels containing offices of health care providers
(Group B or I)
1 3 passenger transportation facilities and airports
(Group A-3 or B) or
1 4 buildings owned or leased by government agencies
BUILDING ACCESSIBILITY
1 In addition to accessible entrances required by Sections 1105 1 1
through 1105 1 6, at least 50 percent of all public entrances
shall be accessible -- Sec 1105 1
2 At least one accessible entrance shall be provided to each tenant
dwelling unit and sleeping unit in a facility -- Sec 1105 1 6
3 Where parking is provided accessible parking spaces hall be provided
in compliance with Table 1106 1 -- Sec 1106 1
4 At least one accessible route shall connect each accessible level
-- Sec 1104 4 See exceptions
5 Accessible routes shall coincide with or be located in the same
area as a general circulation path Where the circulation path is
interior the accessible route shall also be interior
-- Sec 1104 5
6 On floors where drinking fountains are provided at least 50 percent
but not less than one fountain shall be accessible -- Sec 1109 5
Page # 8
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
7 ADA title 3 technical assistance manual (covering public accomodations
and commercial facilities)
A "professional office of health care provider" is a location where state
regulated professionals provides physical or mental health services to the
public The ADA' s elevator exemption does not apply to buildings housing
the offices of a health care provider
ACCESSIBLE FACILITIES
NOTE Except as noted section numbers listed below are from
ANSI A117 1-2003 AND CHAPTER 11 OF THE 2003 INTERNATIONAL
BUILDING CODE
WATER FOUNTAINS AND WATER COOLERS
Accessible units must comply with the following
1 Spout is to be within 36 inches of the floor -- Sec 602 4
2 Spout arranged for parallel approach shall be located 3 1/2
inches maximum from the front edge Units with a forward approach
shall have the spout 15 inches minimum from the vertical support
and 5 inches maximum from the front edge of the unit
-- Sec 602 5
3 Spouts shall provide a flow of water 4 inches height minimum
-- Sec 602 6
TOILET FACILITIES
1 A 60 inch diameter turning space or T-shaped space is required
in the toilet room -- Sec 603 2 1 and 304 3
Doors shall not swing into the clear floor space for any fixture
603 2 3 See exception for rooms used for individual use
2 Water closet shall be mounted adjacent to a side wall or
partition The distance from the side wall or partition to the
centerline of the water closet shall be 16 to 18 in Sec 604 2
3 When the accessible water closet is not in a compartment
Clearance around the water closet shall be 60 inches minimum
measured perpendicular to the side wall and 56 inches minimum
measured perpendicular to the rear wall -- Sec 604 3 1
4 When the accessible water closet is in a compartment
Wheelchair accessible compartments shall be 60 inches wide
minimum measured perpendicular to the side wall and 56 inches
deep minimum for wall hung water closets and 59 inches deep
for floor mounted water closets measured perpendicular to the
rear wall -- Sec 604 8 1 1
Compartment doors shall not swing into the minimum required
compartment area -- Sec 604 8 1 2
Page # 9
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
5 Grab bars shall have a circular cross section with a diameter of
1 1/4 inch minimum and 2 inches maximum or shall provide
equivalent graspability -- Sec 609 2
The space between the wall and the grab bar shall be 1 1/2 inches
Sec 609 3
Grab bars shall be mounted in a horizontal position 33 inches
minimum and 36 inches maximum above the floor -- Sec 609 4
a Side wall grab bars are required to start within 12 inches
of the backwall and extend to 54 inches from the back wall
(The minimum length of the bar is 42 in) -- Sec 604 5 1
b The rear bar shall be 24 in long minimum centered on the
water closet Where space permits the bar shall be 36 in
long minimum with the additional length provided on the
transfer side -- Sec 604 5 2
6 The top of the water closet seats shall be 17 to 19 inches above
the floor -- Sec 604 4
7 Accessible urinals shall be of the stall type or wall hung with
the rim at 17 inches maximum above the floor -- Sec 605 2
8 Accessible lavatories shall be mounted with the rim 34 inches
maximum above the floor -- Sec 606 3
9 Sinks shall be 6 1/2 inches deep maximum -- Sec 606 5
10 Water supply and drain pipes under lavatories shall be
insulated or otherwise treated to protect against contact
-- Sec 606 6
11 Mirrors shall be mounted with the bottom edge of the reflecting
surface 40 inches maximum above the floor -- Sec 603 3
Page # 10
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
RAMP REQUIREMENTS
1 The minimum width is 44 inches If a ramp serves an occupant load
of 50 or less it may be 36 inches wide If the ramp is serving a
high occupant load check exit table above for required width
-- Sec 1010 5 1 & 1016 2 Exception 2
2 If the ramp is part of the means of egress the maximum slope is
1 12 All other ramps may have a slope of 1 8 or less
-- Sec 1010 2
3 The rise for any ramp shall be 30 inches maximum -- Sec 1010 4
4 Landings shall be provided at the top bottom points of turning
and at doors -- Sec 1010 6
Landings shall have a length of at least 5 feet in the direction
of travel -- Sec 1010 6 3
Where changes in direction of travel occur at landings the
landing shall be 60 inches by 60 inches minimum -- Sec 1010 6 4
5 The surface shall of slip-resistant materials that are securely
attached -- Sec 1010 7 1
6 Handrails shall be per stair requirements -- Sec 1010 8
A rail shall be mounted below the handrail 17 to 19 inches above
the ramp or landing surface -- Sec 1010 9 1
7 A curb or barrier shall be provided that prevents the passage of
a 4-inch diameter sphere where any portion of the sphere is
within 4 inches of the floor or ground surface -- Sec 1010 9 2
Page # 11
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
PEDESTRIAN WALKWAY -- Sec 3104
1 The pedestrian walkway shall be of noncombustible construction
-- Sec 3104 3
Exception Combustible construction is permitted when buildings are
combustible construction
2 Walkway shall be separated from the interior of buildings by fire
barrier walls with a fire-resistive rating of not less than 2 hours
-- Sec 3104 5
Exceptions
1 The distance between buildings is greater than 10 feet and the
walkway and both buildings have an automatic sprinkler system
per NFPA 13 See exception for glass requirements
2 The distance between buildings is greater than 10 feet and the
sidewalls of the walkway is at least 50% open
3 Walkway is not required to be separated when buildings are on
the same lot are treated as one building per Section 503 1 3
3 The unobstructed width of pedestrian walkways shall not be less than
36 inches The total width shall not exceed 30 feet -- Sec 3104 8
4 The length of exit access travel shall not exceed 200 feet
-- Sec 3104 9
Exceptions
1 If walkway has an automatic sprinkler system length shall not
exceed 250 feet
2 If both sides are at least 50 percent open length shall not exceed
300 feet
3 If walkway has an automatic sprinkler system and both sides are
open 50 percent or more length shall not exceed 400 feet
5 Smoke and heat venting shall be provided for enclosed walkways
-- Sec 3104 11
STANDPIPE AND HOSE SYSTEMS -- Sec 905
Exception Class I standpipes are allowed in buildings with an automatic
sprinkler system
A standpipe system is not required
Page # 12
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
VENTILATION
1 The structure shall have uniformly distributed opening on two or
more sides The area of openings on a tier must be at least 20
percent of the total perimeter wall area of each tier
2 Interior walls shall be at least 20 percent open with uniformly
distributed openings
3 The aggregate length of the openings considered to be providing
natural ventilation shall constitute a minimum of 40 percent of
the tier -- Sec 406 3 3 1
Exception Openings are not required to be distributed over 40
percent of the building perimeter where the required
openings are uniformly distributed over 2 opposing
sides of the building
Ventilation other than the percentage of opening specified is not
required -- Sec 406 3 12
Open parking garages shall be used exclusively for the parking or
storage of private motor vehicles -- Sec 406 3 5 1
The following uses and alterations are not permitted
1 Vehicle repair work
2 Parking of busses trucks and similar vehicles
3 Partial or complete closing of required openings in exterior walls
by tarpaulins or any other means
4 Dispensing of fuel -- Sec 406 3 13
Parking areas shall be provided with walls or barriers except at
pedestrian or vehicular accesses -- Sec 406 2 4
Vehicle barriers not less than 2 feet high shall be placed at ends
of drive lanes and at the end of parking spaces where the difference
in adjacent floor elevation is greater than 1 foot -- Sec 406 2 4
Vehicle barrier systems for passenger cars shall be designed to
resist a single load of 6 000 pounds applied horizontally and shall
be capable of transmitting load to the structure -- 1607 7 3
Parking surfaces shall be of concrete or similar noncombustible
and nonabsorbent materials -- Sec 406 2 6
Exception Asphalt parking surfaces are permitted at ground level
The clear height of a parking tier shall not be less than 7 feet
-- Sec 406 3 5 1
Page # 13
Code review for
Project Id Gateway transportation center
Address 123 E Front Street
The grade-level tier may contain an office waiting and toilet rooms
having a total combined area of not more than 1 000 square feet
Such area need not be separated from the open parking garage
-- Sec 406 3 5 1, Exception
Is the surface sloped toward a floor drain and does the plans show a trap primer
qqy
_�pq�gy§p
Energy Specification Review for International Gateway Transportation Center
Mechanical responses./roin SCS at Tres 1,Yest Engineers tire in blue italicizedfiont. 1111012006
Thermal Insulation
Code Analysis Plan GO 03
• Roof R 38 Sheet A3 06, Sections 2 3
• Wall R 21 Sheet A3 06 Section 3
• Floor R 38? Sheet A 3 00, Section 3
FILk
Water Heating—Section 15480
Model. A.0 Smith DEL 50 with 6kW elements
No GAMA listing of Energy Factor for this model (See Attached)Ly this required? The unit
has been listed with the 4 5 kWeleinents the vpec�fiedunil isthesanie, exceptivith 6kW
elenients
No heat trap to prevent convective thermal loses. (This is a needed requirement) This will be
added bv addendion
Warranty-Tank—3 years,Heating elements-3 years,Parts 1 year (This is an extremely low
warranty)Additional ivarranh, is available.for additional cost I�this soniething the Cin
11"ould like to add to the project?
Heat Pump—Section 15741
Model. Trane 2TWA306OA3 with 2TEC3F60 air handler
No ARI listing for this model or combination See 4RI listing included in einail, docunient
nalnes are Trane ARIpdf and Trane ARI List p(�f
Cannot verify HSPF of 8.5 and SEER of 13 HSPF andSEER ver�fied on ARI listing
No heat loss calculations submitted with plans to verify correct sizing of proposed heat pump
Heat loss calculation included in einail,file nani e is 060602—P 4IG—5ingle p4l'
Economizer and Economizer controls absent from plans (this is a needed requirement) 4ir
Handler Schedule shows 100%outside air capabilitv Section 15900 details econoinizer
operation
Duct work Sections 15 8 10 and 15 813
• Unbalanced air distribution system per plan. (the system needs to be balanced)Systein
ai�flovvs are �hown on �heel M2 01 Building is vlightiv pressurized to control infiltration.
Relief air path is provided through grilles tnarlced TG Insti-tictio;zsfoi-balatici*ngai-e
included in Section 15950
• hicorporate on-site inspection services of Northwest Sheet Metal Inspection Service in plan
with provision for contractor to make corrections as required by inspection reports.
Requireinent.for this will be added in addendunt
James Lierly Energy Spec Review doc _ _T Page 21
i
i
Lighting—Section 16500 i
• Plan exceeds Washington State Energy Code Lighting Power Density in Public Bathrooms
(Specifications are higher than needed)
• Vandal Proof light fixtures per plan in all 4 restrooms. Although necessary in Public I
Restrooms,the vandal proof fixtures may not be needed in the office restrooms. I
• Some additional lighting energy savings may be incorporated by specifying high performance
ballast lamp combination in troffer fixtures (see attached lighting audit) I
• Incorporate minimum Color Rendering Index(CRI)requirement of 85 into plan for
fluorescent lighting.
f
i
i
I
I
i
I
I
I
I
I
I
I
i
I
I
I
I
I
i
i
I
I
I
James—L'
ierly q_1ra� ARI_List.pqfPage 1
HP SEARCH ARI Directory of Certified Product Performance Page 1 of 1
How to Use This Site Help Me
Data is not required in all fields.Entering data in multiple fields may unnecessarily limitthe results.When
entering model numbers,only the first few characte rs may be needed. If you get no results,
reduce the number of characters in the model number
Found 4 matching Heat Pumps.Displaying results 1 through 4.
LOW
Cooling High Heating Haab.ng
47°F 17°F
Outdoor Unit Indoor Unit Furnace S` SEER Capacity HSPF Capacity
ARI Ref, SManufacturer MgkL Trade/B,ne Model Model Model (Btuh) (Btuh) LMPhasLLhL
A tatus i— Number Nu r Nunber
(F 602628 Active THE TRANE
COMPANY XA13 2TWA3060A3 2TEC3F60A1 56,000 13.00 1 53,000 8.50 1 34,400 3
r 1107267 Active THE TRANE XA13 2TWA306OA3 2TEC3F60B1 56,000 13.00 53,000 8.50 34,400 3
I 1COMPANY
I
602513 Active THE TRANE XA13 2TWA3060A4 2rEC3F60AI 56,000 13.00 53,000 8.50 34,400 3
COMPANY
1107257 Active THE TRANE XA13 2TWA3060A4 2TEC3F60BI 56,000 13.00 53,000 8.50 34,400 3
Irr I ICOMPANY I
*Revised si rice last directory see certification report.@Highest Sales V01 Urne Tested Combination,($)Average National Annual Cost of Operation.
Select a model to print.
Print Preview
No results match your search criteria in the HP mix-match table
No results?Click Modify Search and remove some of the search criteria you entered or enter only aportion of the model number
Modify Search Home Download Query Results to Excel File
Air-Conditioning&Refriaeration Institute(ARI)
4100 North Fairfax Drive,Suite 200
Arlington VA 22203
703-524-8800,fax 703-528-3816
Site Design by lip
Web Developers'Studios
Copyright©2006 Air-Conditoning&Refrigeration Institute.All rights reserved.
http.//www.andi rectory org/ari/hp_5earch.p hp 11/10/2006
`James Lierly Trane ARI-p—
Certificate of ARI-Certified Performance
The following
Three Phase, Split System: Heat Pump with Remote Outdoor Unit-Air-Source
Outdoor Unit Model Number 2TWA3060A3
combined with
Indoor Unit Model Number 2TEC3F60A1
manufactured by- THE TRANE COMPANY
under the Trade/Brand Name: XA13
has been rated in accordance with
ARI Standard 210/240-2005, Unitary Air-Conditioning and Air-Source Heat Pump Equipment
and is certified by the Air-Conditioning and Refrigeration Institute to meet
the followingproduct performance ratings:
Cooling Capacity (Btuh): 56000
SEER Rating(Cooling): 13.00
Heating Capacity (Btuh) @,47°F 53000
Region.IV HSPF Rating (Heating): 8.5
Heating Capacity (Btuh) @ 17°F 34400
Voluntarily revised,unless accompanied with a WAS in which case the change is involuntary
ARI Reference # 602628
N.Enc..q._ s Today's Date: 11 / 10/06
Prof.alonallam
I Status: Active
Thr uSh.TgFhni.
CorNflcatlon by NATE
CERTIFIED RATINGS.ARE VAUD ONLY FOR THE PARTICULAR COMBINATION OF INDOOR AND OUTDOOR UNITS'LISTED IN THE
AIR-CONDITIONING AND REFRIGERATION INSTITUTE'S DIRECTORY OF.CERTIFIED EQUIPMENT VISIT WWW.ARIDIRECTORY.ORG TO VERIFY
THAT THIS COMBINATION ISAN ACTIVE LISTING AND THE DATA LISTED ON THIS CERTIFICATE ISACCURATE. SEARCH ON THE ARI
REFERENCE#TO QUICKLY LOCATE THIS COMBINATION IN THE DIRECTORY
TERMS AND CONDITIONS
This Certificate shall be used for individual, personal,and confidential reference purposes only, and may be used only pursuant tothe teras and
condifions listed.This Certificate and the contents hereof are proprietary products of ARI.The contents of this Certificate may not, in whole or in part,be
reproduced; copied;disseminated; entered into a computer database; or olherwise utilized,in any form or manner or by any mean s,except for the user's
individual, personal and confidenfial reference. Contained herein are product information and is certified ratings. ARI does not endorse the product(s) listed
in this Certificate and makes no representatio ns,warranties or guarantees as to,and assumes no responsibilit y for the product(s)listed in this Certificate.
ARI expressly disclaims all liability for damages of any kind arising out of the use or performance of the product(s), or the unauthorized alteration of data,
listed in this Certificate.
i James Lierly Water Division Comments doc _ _._,_._._...n ... _.. _ ...._�._. _._... Paii
i
I
i
F
I
Water Division Comments
Mechanical responses,front SCS at Ties TVeest Engineers are in blue italicized font
1111012006 I
I
Specifications
Section 15120 —Valves
All valves and PRV's should be rated for pressures of 120 to 135 psig This will
be noted in addendum
i
Plans i
Sheet No C2 18 Note 3 j
Make change to reflect what the City of Port Angeles uses
i
We stock the Mid-States Meter Box MSBCF 1324 12 with the D I Lid
(Reader Lid) (MSCBC 1324-R) This Mtr Box is applicable for all standard
water service installations (1 X 5/8' 1 X 3/4 1 X 1 )
I
j
i
I
i
i
i
I
i
i
f
I
i
r
i
r
f James Lierly Fire Dept Comments doc Page 1
E
E
f
Memo
I
Date October 27 2006
To Jim Mahlum
;
From. Ken Dubuc
Subject: Gateway Project Review
Jim,
I have reviewed the submittals for the fire sprinkler and fire alarm systems and I have the
following comments j
1
Mechanical resI)onses fr-oin SCS at Ties West Engineers are in blue italicized font. 1111012006
1) Section 15330 Wet Pipe Sprinkler System,Part 1, Section 105 Qualifications of Installer
Contractor performing the underground portion of the sprinkler system must be licensed
by the State of Washington to perform underground sprinkler work(Level `U' or
equivalent) This will be added in addendum
2) Section 15330 Wet Pipe Sprinkler System,Part 1 Section 106 Submittals,A. 7
It is not necessary to require that drawings have a stamp of approval from the Local Fire
Department. Fire Marshal approval stamp will meet this requirement. This will be added
in addendum
3) Section 15330 Wet Pipe Sprinkler System,Part 2, Section 2.04 Sprinklers,D 6
The plan calls for Viking Model `N' stainless steel or equivalent sprinklers for use in
Corrosive Environments. Due to the proximity of this project to the waterfront, and
based upon past experience with existing systems in this area, it will be required that all
sprinklers that are not contained within an enclosed structure(for example all sprinklers
within the open parking garage)meet this requirement. This will be clarified in
addendum
4) Section 16720 Fire Alarm System, Part 1 Section 1 10 Fire Alarm Monitoring.
It is NOT required that the system be tied to PENCOM.
5) Section 16720 Fire Alarm System,Part 2, Section 2.09 Sprinkler
Fire alarm supervision must include Post Indicating Valve(PN)
Some general comments
1)A KNOX locking keybox will be required for the structure. The Fire Department must be
contacted for a KNOX order form. The Fire Department must also be contacted for suggested
James Lierly doc
Page 2
mounting location.
2) Spare keys must be provided for KNOX box (including any keys for fire alarm or fire
sprinkler systems)
II
3)The door opening into the room containing the sprinkler riser must be labeled on the exterior—
`Sprinkler Riser Similarly,the door leading into the room containing the Fire Alarm Control
Panel must be labeled on the exterior— 'FACP
4)Per PANIC,in a fully sprinklered building, smoke detection may be eliminated from all areas
except over the FACP and in egress pathways.
!James Lierly im e.6i2
Return-path: <scruse@parametrix.com>
Received:from olypen2.olypen.com ([208.200.248.249])
by mail.cityofpa.us with SMTP- Mon,20 Nov 2006 09.45:28-0800
Received:from chip2mx138.postini.com ([64 18 13.218] helo=psmtp.com)
by olypen2.olypen.com with smtp(Exim 4 43)
id 1 GmDCw-00031 v-RA, Mon, 20 Nov 2006 0945:29-0800
Received:from source([209 168.113.30])by chip2mx1 38.postini.com ([64 18.5.10])with SMTP-
Mon,20 Nov 2006 12:45:09 EST
X-ASG-Debug-ID- 1164044693-25958-47-0
X-Barracuda-URL. hftp://l72.24.20 10:8000/cgi-bin/mark.cgi
X-ASG-Whitelist: Client
Received:from CORPS U M N-2.parametrix.com (unknown [172.17 10 12])
by scan.parametrix.com (Spam Firewall)with ESMTP
id 2806F49661 Mon,20 Nov 2006 0944:53-0800(PST)
Received:from Parametrix-MTA by CORPSUMN-2.parametrix.com
with Novell GroupWise; Mon 20 Nov 2006 0944:51 -0800
Message-Id: <s5617913.037@CORPSUMN-2.parametrix.com>
X-Mailer- Novell GroupWise Internet Agent 6.5.3
Date: Mon,20 Nov 2006 0944:24-0800
From 'Stan Cruse <scruse@parametrix.com>
To <Jlierly@cityofpa.us><Jmahlum@cityofpa.us>
Cc:<gkenworthy@cityofpa.us>
X-ASG-Orig.-Subj:Various City Review Comments From TresWest Engineers
Subject:Various City Review Comments From TresWest Engineers
Mime-Version. 1.0
Content-Type. multipart/mixed boundary="=_PartCDE9E468.0
X Virus-Scanned: by Barracuda Spam Firewall at parametrix.com
X-Barracuda-Spam-Score:0.00
X-Barracuda-Spam-Status. No SCORE=O 00 using global scores of TAG LEVEL=3.0
QUARANTINE LEVEL=5.5 KILL LEVEL=6.5
X-pstn-levels: (S:99.90000/99.90000 R:95.9108 P-95.9108 M-97 0282 C:98.6951
X-OLYPEN-SPF unknown
PartCDE9E468.0—=
Co—ntent-Type text/plain,charset=US-ASCII
Content-Transfer-Encoding 7bit
Content-Disposition inline
Attached are resprises to several different City Coments:
Building Division
Energy
Water Division
Fire Department
The City Spreadsheet comments will be a separate item to come.
We will also have Landscape coments to respond to once clarification is
received on a couple of issues.
Let me know if we are missing anything other than what I have indicated
is still coming
Krei Architecture A Parametrix Company
Stan Cruse,A.I.A. LEED v.2 A.P
Corporate Architect
James Lierly Mime 822 Page 2
i
i
scruse@kreiarchitecture.us
scruse@parametrix.com I
Parametrix Bremerton Office
4660 Kitsap Way Suite A i
Bremerton Washington 98312
Phone: 360-850-5313 Direct
Fax: 360 479 5961
i
I
-= PartCDE9E468.0_=
Content-Type:_ application/pdf- name="Pages from Bldg Div comments.pdf'
Content-Transfer-Encoding base64
Content-Disposition attachment;filename="Pages from Bldg Div comments.pdf'
Pages from Bldg Div comments.pdf
Content-Type.application/msword; name="Energy Spec Review.doc'
Content-Transfer-Encoding: base64
Content-Disposition.attachment;filename="Energy Spec Review.doc'
Energy Spec Review.doc
j
Content-Type application/pdf-name="Trane ARI_List.pdf'
Content-Transfer-Encoding: base64
Content-Disposition:attachment;filename="Trane ARI_List.pdf'
Trane ARI_List.pdf
Content-Type application/pdf•name='Trane ARI.pdf'
Content-Transfer-Encoding: base64
Content-Disposition.attachment;filename="Trane ARI.pdf'
Trane ARI.pdf
Content-Type:application/msword; name="Water Division Comments.doc' j
Content-Transfer-Encoding base64
Content-Disposition.attachment;filename="Water Division Comments.doc'
Water Division Comments.doc
Content-Type:application/msword; name="Fire Dept Comments.doc' I
Content-Transfer-Encoding: base64
Content-Disposition:attachment;filename="Fire Dept Comments.doc'
Fire Dept Comments.doc j
t
i
i
i
i
1
(
i
i
E
i
A
EXISTING 13'-0" 6'-10"FACE OF
18'-8" 14'-0" 4'-8" 47'-10"
WALL 2'-0" WIDE 4-8" o 15'-1 8'-10" 4'-11 19'-0'
x 18"DEEPI3;g8
EDGE BEAM7 Q I 1-2" 2'-4
PC-1 PC-1 PC-1 C-1 I PC-11 I PC-1 yy2
2.03 I 112" WIDE x I I I I o S A/S2.03 2
GRADEEAM,I' I --- -J EL 16.75 co_w
1 ® 1 I TYPICAL, SEE 1 ---
:nr II II I II I1 II II II I III1II II III I II II EYPANSION
1 JOINT 6" SLAB ON
10+
go
BETWEEN GROUND, REINF Op
BEAM D 19
A
FACE OFIII TDP OF SLA EACH WAY ON
EXISTING
WALL
' _________ -- ------- --------- --�-- ------------------------- ------------ gym
--
FT ------ ----- - T------- -r�-C-- ;�ir
---- T, T-
T -------- - a
°- 0.6" DIA ONST
I I I® 18• I I I I Jo1Nr I I _ � N a
I I EL 16.50 ap
0 3 1} --1�1 b "�-1 - 6"- 1}" T4 6• 1} 6. 1 -J 3 1 - C1
4 EXPOSED I 1 T2 I r-- T3 O-- T3 T gJ/
FACE OF Bi I B2 I 83 I I I B4 I I B2 I B—5-I / FOR DETAIJELEVATOR
EXISTING STAIR AND
WALL I III III III m p III III I / 9V�1 SEE 54.01
BELOW
IPfD
T. SL B�
1� II QI II I a 11111 o I
1 7}• Ia y . .. t, h3 } 1 " a I I EL 21 ��7 I I 1} a I I„ 1} 6I I I 1}" a I .
I6
� ... ... � I
0.6" DIA I I 6- I ---
8" CONCRETE WALL
LO
3j 1�" 16- 1j" I I 1j I I 11" III 6- 1j" 3"
I " T
III0.6•DIA
® 18" I --_ I 8"x2'-0" CONCRETE = c
0 1 B1 T2 r B2 I B3 I I T3 B4 2 I o B6T6 WALL BELOW s
N I I I 1 1 4,_ . I I I I 1 1 �, 3'-11
L 74- L PBif I JIL PB12 -JIL_� PB13 IL --- E C
4'-10"� r C c
o B/52.03 L .�.. 1 L ——— —� — —J B/52.03 -2 cn
3j" o �°
7} 11 1 ::... I 1}" 111 �" 1 d H m
-'-'-'-- �•_�__::�_• 1 ADDITIVE C I I " I I "
15" SLAB I I l a 8DIA I I CLOCK TOWER
TYP SHADED I I I I 1
AREAS 1 T I (T2 I I-T3—-- J LT3---J L,� --I L----T5--
B2
TS—J
B2 r- -B� -i�-k - r� r- -- ,mss
1 h I S��NAI�G
0 31 t 1 1 • d l �p 171" 1116- 1}_ 1 1 16- 11 1 1 16• 13" 1
m m m EXPIRES 5-30-07
U) la a a a TOP OF WALL Aal O. 7 1
0.6" DIA I I 1 1 I I 1 EL. 17'-6" Issue 09126/66
RevlsIm
_ 3l I I 111" 13 } �..'. ., �3 �" 1j 1 �. 1�. I 161 I 31• - - - - - - - - - - -
C/52.03 I IIII I C/SS203 —
N I I
1-61-6"*DIa ®65DIA I III III I I ®650/A
1 r1 r2 I f I PLAZA PLAN
3 171• t3•j;" :1}� 1 " 31• TOP OF WALL SCALE. 1/8" = 1'-01117 '
EXPANSION EL.25'-9"
Bl 1 .Bi:: 7, i I 3 --1- JOINT
8 — 3---------- --�� -- —
r1 o TT o Grade,Plaza&Transit
JOL
BS TS m Building Floor Plan
0
,� S1.O2
A B C D 413'--11 13'-0" 6'-10" 18'-8" 18'-8" 4T-f0"
VERIFY 14-10" 14'-6" 14-7"
I �
01 -LT T
o
CD
L
A/82.03 I EL. I I I
A/82.03 ca a
I
o,
v I o I I Ok y
I
S m�
I
°- 1
2 1/2" CONCRETE ��0'�
OVER 2" x 20 GA
I I I ( STEEL DECK
I I I
1101 BU-1
�_ � - BU-1
I I I I RP�1
I I I p� m 6�OC� gx gg
N I ' I ❑ i I ❑ 1�Z II `4
I I 1 I 15�y I
EXISTING I
WALL I w I
BELOW i o o I I I I I
5.1 — + ❑ �I T CDZ
j I I I I i c c
C=_=- - 2 1/2" CONCRETE OVER
1 1/2" x 20 GA STEEL
1 I may% P� I DECK REINF W/#4 0 E =w 12" EW w V t�J
I (� ❑
I i�'!1`P i'i C---- — ^ N p O
' RP �'�
5 B/S2.03 ,0 '� I _ I 1 _ _ B/S2.03
i
m
I
I 2'y
I
1 i6 ❑ ❑ ❑ ❑ lona
:EUR!eJ�•'G
NO
I 0 S�ON,4l
I
p � EXPIRES 5-30-07
Piot o. 701-3116-001
CONCRETE TOPPING
toI y ELEVATION VARIES, SEE Issue 09126/06
�I52� ARCHITECTURAL DRAWINGS RB Wom
I
I
I
I
I
C/82.03 i C/S2.03 PLAN
I SCALE. 1/8" = T-0-
I
I ____________
I o Topping Slab,Pavilion&
o i y Ramp Framing Plan
I o ,
' S1.03
A B C D E
34'-10" 3'-4" 24-0" 3-4 26'-0' a
SIDEWALK •N
C
ro EL. 22'-0"
PILE 1 EL. 12" WIDE x 1-6" EL. 16'-0" 3
CAP PILE DEEP GRADE BEAM, 1 EL. 16'-0" r`
2'-0" WIDE x 1-6" TIP
DEEP EDGE BEAM 2'-0" WIDE x 4'-0"
SECTION � DEEP EDGE BEAM a
1/8"=1-0"
A B C D E
mm
I I I I
I I TOPPING SLAB OVER
I I ( I I WATERPROOFING REINF i— -+ —�
1 I W/ WWF6X6-W4XW4 I
I I I I EL. 22'-0'
l� 1 j
I I t
--- I 4
. 5 S!M
SECTION
� N
CC Z
E-
ca
3 A B C D E
5 C � C Q
5
__________ ___ ____ 6
CLOCK TOPPING SLAB OVER 2 E
PEDESTAL WATERPROOFING ��. ()
I 1 �— I I EL. 22'-0
O O
------ --- -----)
I I I I 24"x24"BEAM BEYOND ca
I I EL. 10'-0"ob
Q� m
t I I
s SECTION
/ONAt_
1 Q ) 8 A EXN5-30-07
Y TOPPING SLAB . 2 SIM ProJed o.. J 70 6001
1@6
6 A OVER PT SLAB B Inue09126106
.
1 4 TOPPING SLAB OVER 2
6 PAVILION PEDESTAL WATERPROOFING W I
I�
I _ i
(� i I II I
24" NIDE x 24" DEEP DIAPHRAGM BEAM, I I
I I REINF W/3#7 TOP AND 5#7 BOTTOM
I I CONT AND J5 V 0 18" OC TYP I I EL. 10'-0"
1
I ( I
Plaza
SECTION �p� Cross Sections
1/8'=1'-0"
52.03 :
2-#4
CONTINUOUS STUD WALL
PLYWOOD PLYWOOD <
TOP OF PLINTH 2-#4 2x STUD 2-#4 A 5
EL. 25'-6" 6"STEM
WALL #4 ® 12" OC
�3
#4 ® 12" OC #4 L®8" OC #4 L®8` O.C. 2-#5 CONTINUOUS
10' TOPPING SLAB 9' PLAZA 6^ Lo vigil
REINF WITH WWW TOPPING SLAB TOPPING SLAB OVER
W 6X6-W4XW4 EL 22'-8" WATERPROOFING
TOPPING SLAB OVER PT SLAB
EL. 22'-0" EL. 22'-0" WATERPROOFING ao EL. 22'-0" < g
L�r --
#4 EACH WAY 1191111
1 1
WATERSTOP
PT SLAB "SWELL OR
a
OR EQUAL
3- 7 TOP &
i---'-� # 1-#5 #4 012" OC �
BOTTOM W/#5
® 18" OC m
� m
CURB AT GLAZING STEM WALL AT VENEER leg I91 1151
DETAIL DETAIL DETAIL rY�
112'--1'-0' 112'=l'-O'
6" 6" 3/4" CORNER
TH'D INSERT- WILLIAMS F15 CHAMFERS
LOOP FERRULE 1" UNC X 8"
LONG OR APPROVED EQUAL
p I I IW/( SE PL
4)1AR/ 2B HOLES • 8
#5 X 2'-0"BENT I FOR 1"BOLTS
HAIR PIN THRU LOOP ]IN SIN
OF EA AB INSERT io -L
T
(9) #5 VERT DOWELS 0 I
#4 TIES ®6" I SIDEWALK 4" TOPPING
SLAB SLAB
�n
c i7 I TOPPING SLABCC
-0" COMPAC7E0 N N
PT SLAB EL 21-7" FILL 0
SQUARE
E
CfjC
v
W-17PT SLAB Ca C
PEDESTAL AT PAVILION CD v
/'� c
DETAIL / 4 ` SECTION rc-"� 2 o `�
N.r.s. 1/2`=I'-o" S2.03 rn AT
20 8
c
•s
4" 4" 8" 4" 4` 2'-0" d H m
C4X5.4 EDGE W/ 2 1/2" CONCRETE OVER 1 8^
1/2"x6" WELD 1/2"20 GA B-DECK P`
HEX COUPLER w/ #4 TIES STUDS ® 12" OC REINF W/#4012 EW
PLASTIC CAP
a
' N A3)07 BOLT THREADED4 #4 ONAL�G2
TO COUPLERS o 0
N I 'qTOPPING SLAB OVER EXPIRES5-30-07
#4 TIES 8#6 WATERPROOFING P�ol�tb. 7073118-001
x Z EL. 22'-0" Revbns® ® ® I12II06
k3/8x4xO'-8"
n
'10LI
�.
M v #6 —
n h HEXCOUPLER
TOP OF PT SLAB
PT SLAB #4012"AT rt
N
PEDESTAL AT CLOCK TOWER CURB AT GLAZING Plaza Sections
DETAIL SECTION la� and Details
N.T.S 3/4"=1'-0"
S2.06 V
/y�
ZO'SS
S1ie1eaPUB SG140Jd NVId GN3 0NISSMUS N0UVA313 GN3 0NISS38iS N0UVA313 GN3 ad30 N0U33S NV38
7101 80 H101M WV38
UL689 p8U01SU8j-ISOd a3LSV71d 371103H0S aid
NW11100 JN13a OIIW W01108
1n0aO n rm+,
TWOS WV38 WV38 =1�' m w
SV 73A37 3WVS m e o °; c s
Z0 3015 HOV3 S#-Z ;
NE1N3W3ONVd8V 8V8 `
ajW aid 80HONV
ONV JN138 1Vn10V &0-471V13O ONV 3lna3HOs ON3 OV30
30
NW11100 33S A7N0
wgsyea 30N3a3d3a 80d 0 38V in03a SV NMOHS SV dNl3a OIIW BVIS ONVaLS 8V7S
NMOHS SWG 7VOLLa3A 31V1d 80HONV SO3dS meg-t 3NI38 80HONV 4#
9019zmonsq ONV SM NW11100 1V SAL IIno aid 1no&o dAl �a1N00 Id a3d ON/8 NOISN31
L O! o pe(ad 3NI38 80HONV Id 10110 1d ginn3HOS d01
1N13
LO-0£-S S3iiidX3
x x 09 Z l8d .zl .z! „8bxM„09 L l8d .zl '
0„8� M„09 £ 8d .zl .zl "13 „
dAl
.zl .4z®(-4 s# .s® s#(oz) .4z® rl s# .�® 1 .zt ®,n,s# .zt
.o-,s .o-,01 s#(oz) slaoddns w .9-,zrx6# (L)
ca ® .9-,4® dVl
ICA •9-•5L SONValS 1N00 6# (Z) .0-,9ex6# (4)
x6#(s) N •VIO .9.0 (4l)
N N
G C> �' N
I�
� HOOs i.
1 O
X096
tcCD
> > n
w SONValS a .B-.91x6# (4) ® .s V GIN 9 x 61 (L)
c7 .o-,sl x s#(s) -V/10 .9-0 (Zr) dvi
-J-,zr
3 N .0-,0Zx6# (L) •1NOO 6# (Z) x s# (4)
>= .o-,se
cL
0
du 4„8-vxM„ O l
0£ ed .z! .zl 0„8 x „0£ 68d „ PM„0£ b'98d 4„8tFxM„0£ 98d
dAl dAl dAl
c .Z1 .zt ®a 9# w .9®a «9® w .ZL ®A s# .Z! s# .ZL ® ��s# .ZL
ro la0ddnS 1V.9-,b .0-,64x6# (S) W .0-,64x6# (4)
dVl laoddns 0 .0-,4 s# (L) S# (L) .0-,64x6# (z) dVl
N N N N
1• V V V
V
X099 a�oN0911
NVdS01W
IV.0-,4 ,6b �I 0-,Or SONVa1S NVdSO1W 1V .9-,4 x 0-,rr SONVa1S
dVl 1N00 6# (Z) �;W(Z) °D x 6# (r) VIO.9.0 (L L)
dV7 •1N00 6# (Z) s# (4) VIa.s o (4r)
x 6# (4)
0_9"
0-,zz - i x 6# (4) x 6# (4) o-,L) x 6# (4)
all MIR Ill .s-,4L Xs# (r) x s# (4) x s# (s) .s-,4L
p $ „BbxM„0£ 88d 0„8* M„0£ L8 dAl dAl a„8t m 0£ t8d 0„8-VxM„0£ £8d dAl
dU
..z! .4Z 0.n,s# w .4Z®f1 s# .Z! .Zl .40 0 J-1 s#
laoddns 1V .0-,b .0-.64x6# (r) \ .0-.64x6# (r) laoddns 1V.9-,4 .0-.64x6# (4) \ .0-,64x6# (4)
dVl 1NOO 6# (z) N N dVl •1NOO 6# (Z) N N
$ 8 S N N N N
RR4 I 1 V
V V V
14
NOrS m N0911
'1 ! NVdS01W 1V.0-,4 �j
a-of SONVaIs NVdS01W 1V.9-4 0-,rr SONValS °
a N $ m x 6# (Z) VIO.9.0 (91) dVl 1No0 6# (Z) 00 x 6# (4) Via.9.0 (4r)
dVl 1Noo s# (z)
a x 6# (4) \ x 6# (ti) _J x 6# (4) .�9-ti x 6# (4) t.0
�) .9-41� x 6# (4)
.9-,41
o � x x `dSBd 0„8txM,tZ Z8d a„ORM„-F l8d dAl
r cd. du 0„Sti M„0£ V98d d„8b M„0£ dAl dAl
.4z 0,n, s# w .4z®n s# .z! .z!
n laoddns 1V .9-,4 .0-.64x6# (4) w .0-,64x6# (r) laoddns 1V.9-,4 w .0-,6bxs# (Z) .0-.64x6# (Z)
s dVl 1NOO 6# (Z) dVl 1NOO 6# (Z) N N
fig
"j IliN N N N
C V V
N018 a NOLO A
§f NVdSOIW 1V .9-,4 �j a-cc TSNV7aL-- NVdS01W 1V .9-0, w .0-,rr SONVa1S
N00 6# (Z) x6# (r) VIO .90 dVl '1N00 6# (Z) 9 x 6# (4) 'Vic.9'0 00
x 6# (4) \ 9 x 6# (s) x 6# (4) x 6# (4)
,9-,b! .9-,41 .9-,4{
Al
S3anSS3ad
4
i
O
W
— — — — — — — — —
I
I I I I
I ' I
I-- — — — — — — -- — — -j L- —F F I
I
I II II I
• I it I i
r- - - - - - - - - - - - —
— — — — — — — — — — — — — - - p- - -I
--
1I I I _4 I I Ipl lol !off ; — -
II II I II II II II ; • � � i
II it I II it II II ; II I
ool ooi aol ool I®I I®I I®I I f
- - — — — — — — --J L - - J J - - J I- - - J L - - -J L - - -J L - - -J L - - -i - -1 L
- - - - -
II II II
oal I owl I
— — — — — — — — — — — — — —
DI I I ool I
- - - - - - - - - -J - - - - - - 11- - - - - - - - - -- - - - - - -i1
—_ -- - - - - - - - 7 - - --I F-- - ---1 F- - - - - - - --I F- —I I— — -r --F
- - -
� lool I l iIF�! I I I lool lool ( I I I
91 II 1 II ij
—J I I®I oa oa
I I I L i� �i I ii ii ii—I I i i I I i I I I
i— — — — — —— — — — — — L _L I— — u— — t — — 1— — — --� �— — — J L —
I
I
L I
� II
II
II
II
II
I
II
II
f\I
A
I
II \\
II
II \\
I \
II )
II
Y
II
I i
II
I
II
II
II
I
II
11
11
It
II
II
n D II
If
m < I II
r 1 II
Q II
it
II
II
o D II
Z IJ
II
II
I
II
II
II
I
It
II
II
I
II
j°D I _ Port Angeles International Gateway ' ' krei architecture
� < • X Boyd Enphiem6p Tien NbslEip'meae ply dean AnBdae
2066253777 2534723300 3604174803 Base Bid&AddMnA
Transportation Center
CaQe
>- "� PMMe* Tres West Ergiieata cWM Tlarod System 5814Gmharn AvwW Supe 200 � '
3603770014 2534723300 3804521315 P.O.Box 460 4660 MW Way&MA
u cj Samier,WwWngton88380 Nowbon,WaftVbe 88312
Undscep Segs Enynm AMhbd Adds.B&C 2538635128 3603770014�owr
Pamro66t LwlaeAseadaW UnM"AS b 25388373991acshb 3604765981 facsMOe
Bid&Cmtnjction Set Addendum No.2 4254596200 2538Y62483 3604528116 ww*Mwm dbm eae www mm`
m
o, 5 1 8x18 c42' of W6 G Pp G 5 118X18 G G
cn j
4\. T—
'�LO
to �_N x N W6 T—z—
U) to to
o41150 mm
<o N G� p G�
T-1 Q > 3 p-� ----T-�-----ru
N 3 1/8x9 CURB p W6 & W16 691
x AND SKYLIGHT ^
SEE ARCH rn rn
C/BS2.03
�I U) , G,� ^ G,9 202 LEDGER
00 T-1 ro h --r-1— ups
^s2.02 \� \ ^ ^s2.02
x 2X TONGUE AND GROOVE °p Y
Z g N SIMPSON PA23
DECKING PERPENDICULAR / U) G� x , — STRAPS 0 48" 8
TO FRAMING, 7/16"PANELS OVER $� ———T-1—————— N 4
T-i o S
IR 6
DIAPHRAGM 3/4"
GLULAM 3 1/8x9 PLYWOOD AND JOISTS
RAFTERS ®4'-4 O.C. VERTICAL K `K SOLID BLOCK
ROD BRACING -k
w w to to
x T-2 x T-2
o ^ --- ----- --
e/esz.oz B/BS2.02 00 X
o
c N C) cb
G�� G�ti G�ti h (Dto
N
t/155 1 8x18 42' 1 8X18 Z
C c
0 0
Em
12'-0" is'-o" 12'-0" C U
0 o GL3 1/8x9 RAFTERS a> 1
0 4'-4" O.C. w .O
� >
o � �
PAVILION ROOF FRAMING PLAN .� PAVILION LOWER CHORD FRAMING PLAN .� OE of• ��y�
SCALE. 1/8" = 1'-0" . SCALE. 1/8" = 1'-0" .
EXPIRES 5-30-07
PIoJeCf u. 70 J11 1
Issue 09/26/08
A ZONE PANEL NAILING NOTES NOTES: Revlwm
FE? THICKNESS 1. ROOF DECKING TO BE 2x6 TONGUE AND GROOVE, DOUGLAS FIR _
A 7/16" 8d 0 6 EDGES USE EQUIVALENT SELECT GRADE. LAID PERPENDICULAR TO FRAMING. _
8d 0 12"FIELD 1 112- LONG FASTENERS
B 7/16` 8d 0 4" USE EQUIVALENT 2. ALL DECKING JOINTS TO FALL OVER FRAMING-NO EXPOSED
A A B 1 112" LONG FASTENERS JOINTS.
B 3/4" 10d 0 6 EDGES SOLID BLOCK
IOd 0 12" FIELD 3. FASTEN DECKING TO FRAMING WITH ONE FACE NAIL AND ONE
A NOTE. FOR PANELS OVER T&G PLANKING, LAY LONG EDGES NAIL AT TONGUE WITH 16d HOT-DIP GALVANIZED NAILS.
PARALLEL r0 PLANKING. CUT PANELS SO THAT JOINTS IN 4. COVER TOP OF DECKING WITH APA RATED PANELS, NAILED
ADJACENT PANELS FALL OVER COMMON PLANK FOR SHEAR W17H 1 1/2" MAX LENGTH FASTENERS WITH SHEAR VALUES TO
TRANSFER. MEET REQUIREMENTS SHOWN IN DIAPHRAGM PLAN.
Pavilion Roof
DIAPHRAGM PLAN
Framing Plan
BS1.02
ROD BRACING
SEE 8 <
.OS
GL5 1/8x12 s
2
1 8X9 c`S
GO
N N U.
IngR
GL5 1 8x9 d
GL5 1/8x18 GL5 1/8x18 GL5 1/8x33 GL5 1/8x18
mm
o p �
Nall E9 1
to to to to to
s
EL 22'-0"
PAVILION WEST
SECTION
scALE: 1/4"=1'-0" BS1 02
ROD BRACING
SEE 8 � w
Z
E
GL5 1/842 C
P9 RgO ` m
CSC _(D Q
C
Gv,5 tI$�c9 GCS'�Bxg U z
C c
CO
O c
N C14
O O
O
ti X118x9 O p
io d IF-- m
GL5 1/8x18 GL5 1/8x18 GL5 1/8x18 GL5 1/8x18 GL5 1/8x18 GL5 1/808
to to to tx 0 t0 x o
,aG
to to to to to rNAL F`
0
Pmja a 70 3118-001
188118 OW26M
RWWM
LL
o
I
EL 22'-0"
PAVILION EAST
ELEVATION
% Pavilion Sections
SCALE.• 1/4'=}=0' 851 02
B
S
f 13 BS2.01
6'-0" 6'-0" 8'-0" `
1
SIMPSON LEG3 TYPE HANGER
01 I OR SADDLE W/SLOPED SEATSIMPI $ 3 8
ION HGAIOKT
EA SDE I I = 9 m
GL5 1/8x6
CUT BIRDSMOUTH ®
BOTTOM OF RAFTER 0 o
I
I � � GL5 11 8x21
I I I I a
I 1 m
Dt BOLTED CONN. MIN Jul 1 9 51
2
(2) 3/4' THRU GLB'S
V I
= 8" CMU 3 SIDES
5 118 PERIMETER JAR
3 3BEAM AR .
TYPICAL RAFTER
DETAIL
EL 22'-0" SCALE. 1'=1'-0'
TRUSS T-1
PAVILION SECTION
SCALE 1/4"=I'-o" BS1 02
ccc
3
m
6'-0' 6'-0' a'-o" Icc
CD
5 !BOLTS
RI CGL5 t/8x9 — OGL5 1/8x6 5 1/8 HIP RAFTER
COUNTERSINK BOLT HEAD C h& WASHERN43 COMPOUND MIN -2 g(2) 3/4x6 LAO �OR THRU BOL $
GL5 1/8x21 I O v
RAFTER AT HIP CONNECTION a m
DETAIL
/1 SCALE 1"=1'-0'to to
—
co
G
h y �ONAI
Z =
ETPIRES 5-30-07
ftjed No. 7013116-001
Issue 08123m
RevW=
EL 22'-0"
TRUSS T-2
a PAVILION SECTION
scALE 1/4-=1'-o" BS1 02 Pavi ion Sections
A
s
BS2.02
r
N <�8
END le 3/8' W/(2) 3/4" A325 3 1/2- 1/4' BACKERS
EL 38'-0' BAR HSS6x6
W6x15 W6x15 'fi—l� COLUMNS g 38
� � �� .
1 1/2" J I � �
W6 BEHIND 2
DRILL FLANGES , Typ
5/8'DIA ® 1/4 2-6 V
I W6 BEHIND 12" TYP I W6 BEHIND I �=
WI6x26 1 r
1 1/2' W16x26 <
21
WOOD STUD
FRAMING ( ,
�a3n
W16 BEHIND �5/8x5 1/2
W16x26 W16x26
W16 END I)'. W16/HSS6x6 b
EL 30'-6'_ , , -I- DETAIL DETAIL
R 1/2x15 I R 1/2x15 I SCALE. 1"=1'-O" — SCALE 1'=1'-0'
lag jig 9
o f o f x I � gg gg g
SS6x6BRCSi xi 3
SEEIARCH OLUMNS 3f 3
I WI6 �X1 gr
I 274 4(1/4.3-12 g
BASE!? 1/2x12x12 gg g
BOTTOM OF BASE R I W/(4) 3/4'AB I
EL 22-9 1/2" — — — — — — — — — —SOUTH SIDE OF BREEZEWAY 3/8 S77FFENER
SECTION STIFFENER F�
SCALE 1/2'=1'—D' BS1 02 DETAIL DETAIL
SCALE. 1'-I'-0" — SCALE. —
a
� N
td O
1`
N ( HSS COLUMNS 'cc '
Ozi— `
EL 38'-0' I I111��� EL 38'-0"- W6x15 C Q Q
Wi6x26 W16x26
I° V -
I° O O
3/8'KNIFE IE HSS COLUMNS
DRILL FLANGES I CONN. THIS I BENT Ie 1/4x6 cCL
n
5/8'DIA ® 2/ I SIDE ONLY BRACKET �
FOR
I 12 (TYP) 20
N W16x26 d m
WOOD STUDe
\
FRAMING I 3/8" STIFFENERS (TW) `r BRi
A '-C
WI6x26 d �
WI6X26 W16x26
I
EL 30'-6' EL 30'-6'- 3
N I R 1/2x15 I R 1/2x15 3/8"KNIFE R R 1/2x15 W16x26 /0Nni
I
X N ,to CONN. THIS EXPIRES
to SIDE ONLY 5-30-07
\ I Pmsu6je 7 3 1
� I I HSS COLUMNS IS09/26N6
Revidaeo.
0
BOTTOM OF BASER I I I EL 25'-1 1/2" _
EL 25'-1 1/2'
BASE VOx20 BASEQ 1 2xi2x12
FOR HSS COLS BOTTOM OF BASE !e W/(4) 3 4"AB
EL 22-9 1/2'
NORTH FACE OF BREEZEWAY EAST FACE OF BREEZEWAY Pavilion Sections
s SECTION �B� �— SECTION rC�
g SCALE: 1/2'=1'-O' BS1 02 SCALE- 1/2"=1'-0- BS1 02
BS2.O3
14
a ,, ,
�g
BAR 3x316x0-5 1/4 5 1/4" I 1 \
WELD 3 6' R 4• 2" 6" 6" 2"
EDGES 1/4 4' 4° 4• 4" 2" P114 EA SIDE �" 7" /
r1/4-
F114'
'a I 2•
4
co
12
4 rN
\ I T IL1/4' �12 11/4x6 EA SIDE
$114
vS
jig 6.25 I 6, big
I /
12 ,/ I \.
825 13i 3 g
YSIDE VIEW g �E R
1'
12
1125
TOP CONNECTION AT T-1 TOP CONNECTION AT T-2
c
T
N
� Z
1 C7 E
-o
R / O v
a Q
\ / I E
\ // 12 � 12 � U
5
-� R7_g• 10.25 5 1/4'// 8.25 I by'
2' 6" 6' 2 Cg
Q t�
O p
4
/ y )E1/4 EA SIDE IP7 f� ~ m
12"R BENT(L'1/4" �2
I I �
/ 12 12 \ I 1/4 ft X10131111
1"UG 0VAN
Raw==
10.25 10.25
)E1/4 I
SIDE VIEW
CONNECTION AT T-1 AND T-2 CONNECTION AT T-1 AND T-2
g TYPICAL TRUSS CONNECTION DETAILS
Truss and
$ SCALE 1/1"= V-0' Timber Details
i
BS3.01
CAP IR WP 12 4 1/2' CAP IP WP 12 4 1/2" 2
iv 3/16' TYP 4 N 3/16' TIP 4�— V
EL 44'-0" EL 44-0"
/ p
cs
I i I
/ 12
i toast �i0'
2 3 2 /
c S3.05 / OS16s
– I CUT SLOT IN END DIAGONAL3
TO PREVENT BOLT FROM c 05 Y 3 e
I BEARING LEAVE 1 MIN GAP
_ _ I TO T.O. BOTTOM CHORD ^
EL 38'_0" v \ � EL 38'_0" ---------
]IN
i
2 2
05 .05
a
c
N
CC Z
E
cc :3
c c
4 HSS6x6x1/4 4 HSS6x6x1/4
cc
E a
� c c
w
W to
vi o .9
a�
co
c
Cx- in
of
J Bq/
E .. c
1 1/2"GROUT
5/8S3.05 5/BS3.05 .0....NAL.
TOC EL 25'-0" / \\I TOC EL 25'-0" TOC EL 25_—� TOC EL 25'-0" plq,,WES5-100-0;m1
Issue 09120106
--- -- 5 --- -- 5 .05 Revl*s
05 —
LIJ
COLUMN C-1 N&S WALL COLUMNS COLUMN C-2 E&W WALL COLUMNS
DETAIL 1 DETAIL 2
ALL HOLES 13/16"DIA UNLESS Steel Details
SCALE. 3/4"=1'-0" SCALE. 3/4"=1'-0" NOTED FOR 3/4 A307 BOLTS.
BS3.O2
Al
TOP OF COLUMN 4 1/2" 3§
WP SLOPE BEHIND
3/4" A307
i-+ 0<3
EL 44'-0" _ C/— FTill ��
CAP IL114 AND ��Q I I I co„
BENT 11/4x6 I $
/ BENT IL3/16x3 3 5!a
CAP IP3/16 SLOPE
DOWN 4:12
\\ CAP fC3/16 mm
/ N
n HOLES STAGGERED ON 05 /
OPP SIDES OF COLUMNS
COLUMNS ON OPP SIDES OF HIP
RAFTER TO EXTEND UP TO WITHIN
Y 1 1/2" OF UIS OF ROOF DECKING
\
!CAP
183/16 SLOPE
EL 38'-0" C/ x DOWN 4:12 A R
SECTION SECTION �� g
SCALE. 1 1/2"=1'-0" — SCALE. 1 1/2"=1'—O" —
v
3
S 05
� N
� Z
� E
4 HSS6x6x1/4 C
O
E ED
4- lr4-
co
..
I- -I rn C>
do a' i3
o F= m
7�rTnm I
1 1/2" GROUT W
4/BS3.05
— IOIJAI
TOC EL 25'-0"
EXPIRES 5-30-07
2,0 701J116-001
5 1/8' GLULAMS NOTCH TO CROSS ® CORNER Issue WNW
SECTION �C� R
SCALE. 1 1/2"=1'—O" — —
COLUMN C-3 CORNERS =
DETAIL 1
SCALE. 314'--I'—C"
ALL HOLES 13/16" DIA UNLESS Building Sections
NOTED FOR 3/4" A307 BOLTS.
BS3.03
I
g
4 1/2" 12 WP 4 1/2" WP CAP P
4 y
\ �4 \ 3/16" T1P �F
EL 44'-0" _ _ _ EL 44-0" _ _ _ EL 44'-0" �N $
I I mo, M co
GL 5 1/8x18 \ - - — / GL 5 1/8x18
v m
2m
2 B .0
B
F� y
3
BS /• ---- �\
Bi/ - I -
to
I
EL 38'-0" EL 38'-0" 149 RE S3i N
I Ia) a
- — CONNECTION TO SHEAR o II gig 11
WALL SEE 1/8S3.05
GL 5 1/8x18 I - ------
I I
NOTCH END OF
33"BEAM �_ `GL 5 1/8x33 B INVERTED GL 5 1/8x33
2 `*
B .
C�
3
N
COLUMN C-5 OVER PLATFORM z
4 HSS6x6x1/4 DETAIL 2 3
SCALE. 3/4"=1'-O" C c
O o
cid +� Q
E
coU
c �
ao
co p�
N—
a U
C od
J
1-1/2" GROUT icy
4/BS3.05
TOP OF CONCRETE EL 25
EXPIRES 5-30-07
--- -- 5 PI.I a 70131 1
05 Issue 091206
ReVW=
COLUMN C-4 SIDES OF PLATFORM
DETAIL 1
SCALE. 3/4"=1'-0'
ALL HOLES 13/16" DIA UNLESS Steel Details
NOTED FOR 3/4" A307 BOLTS.
14 BS3.04
114
GLB-PROVIDE TREATED GLB-PROVIDE TREATED
3/8 0O 0 3/8" PLYWOOD FILLERS 3/8" PLYWOOD FILLERS
3 g
LAP W/T.O.W. BOND ON EACH SIDE 5 1/4"
I I \ p p BEAM REINFORCING ON EACH SIDE 2
_ N & GROUT SOLID 13/16"DIA FOR
I I M 3/4 A307 5 1/4" 2^
v NOTE. SPACE BETWEEN HSS6x6
I _ _ EL 38'-0" 2 1-0" 2" LEFT OPEN FOR INSTALLATION PT, _ I gg
o I I
i1/4
OF GLU-LAM BELOW48 - \ N j j - - _- BENT 83/8 BENT 13/8 �1-0" � I I 4 1/2" _IA x48" 4 1/2I EBARS0. old
, , 13/16" DIA FORLTS 0 COL 3/4" A307AONNECTION ggif.3/16 3/16 y3 0 4 16" 12 TOTAL4� HSS6x6HSS6x6 EA LOCA77ON HSS6x6 W jig 9
PLAN SECTION A FRONT VIEW SIDE VIEW FRONT VIEW SIDE VIEW
PLATFORM CORNER BEAM SEAT BEAM SEAT
DETAIL DETAIL (� DETAIL
13S1 02 1"=1'-0" BS3.02 1^=1•-o" BS3.02 :
s" 12'-0"
3" DIA GROUT 1-0" i Ig
VENT HOLE 6^ 6- BASE 83/4x20"x2O"
I '!
O 1/4"DIA DRAIN HOLES 5 1/8x12 GLB
ip 0 COLUMN BOTTOMS RIDGE BEAM
o O
BOLT BRACE TO
LOWER BOLT ON TOP
CHORD BRACKET
1 1/2"DIA HOLES I 3
� FOR ANCHOR BOLTS 1/4 N N
cCD o
Z
BOLT BRACE TO E
BRACKET AT LOWER I C q
CHORD p m
BASE PLATE E
RB
4- BOLT AT
DETAIL ACKETS TYP I C C
�4� 5 , 8x9 GLB a
BS3.02
c CD
CD o
I y U
C
� � m
1 DIA A36 TWO ROD — TACK 8'-0" gR�
WELD TO INSERT FOR COLUMN
INSTALL'N. °
SECTION LOOKING NORTH SECTION LOOKING WEST
SCALE. 1/2" = 1'-0" SCALE. 1/2" = 1'-0" IDNAL�G
17'-8" CALCULATED LENGTH (FIELD VERIFY) P*-ExPIRES 5-701 0;&W1
Issue 09126106
TOPPING SLAB
1'-0" CUT TO FIT RevWmm
PT SLAB 1 1/2" 1 1/
EL 21-7' —
13/16" DIA
BAR 2 1/2x1/4x12" 7
13/16"DIA
BEND APROX
30 DEG TO FIT TURNBUCKLE 5/8" DIA THREADED ROD
DETAIL DETAIL
LOCKING NUT Steel Details
�� ��
BS3.02 3"=1'-o" —
BS3.05
NOTE: BRACES NOT SHOWN FOR CLARITY
I W6 STUB
WT3 /1\ 2'-0" 3
WT3x7.5 EA SIDE W6x15 STUB
EA COLUMN 1 4 TYP (/ 1 4 TYP
W6 I I W6 \ \ / i q
Sk
2-3/4 DIA HS 1 4 TYP L<
1r I I �r 1co
4 T1P /\ BOLTS TYP + + + + rJ
I I I I i 4 ? 13/8 GUSSET i° §151
-- -------L-----___ -r 3 I / \ TYP c o CONCRETE PEDESTAL
-------------
---n-- ,.- r----
II C' (8) 7/8"DIA ASTM Y
A307 BOLTS
4-3/4"DIA / \\ // BASE IZI 3/8'x20xi-8-
HS BOLTS / \ TYP i0
In 111 fig
6' MAX
X—BRACES
TOP VIEW SIDE VIEW DETAIL DETAIL
TYP A R
IE3/8x19x1-7" m
CAP PLATE
I I
I I I I
I I
1 4 TYP
I I p1
II \ 3"
I I
cq
II I \ I
c
II � 3/8 /�3/8 GUSSET �14 . � �( Icc
�L� 1 1/2" \ + \ Cd C
/ / +/ T/ 1/2" W6 \\ \ \\ CD
W6 STUB W6 L I I c Ucl
co
aE + II1 1 I 4- 1 + II -�- I _ + 1 _ i -r II I
II -}--
+ II + I + II + + I C
N
W6
I I
\
a m
I I H
\ \ /p3/8 �/ � 4/_ W6
\\\\` �+\\\ 13/8x4 1/2x0'-6 1/2" % +/ +// I I 1 1 2" GROUT E BR/c
I THREADED 1 I /
J COUPLER I
11 3 SIDES
W6 STUB NAL'
III \
II I / I EXPIRES�5-30-07
I I / ProJed No. 7013116001
li \ Issue 09128108
h
III I I I M RBVlebfq
01
II 3 I� \ TOPPING SLAB
I
I I TOP OF PT SLAB —
EL 21-7*
ELEVA TION
BRACE CONNECTION TO WEB BRACE CONNECTION TO FLANGE Sections and Details
DETAIL DETAIL r1 DETAIL r5�
TYP 3"=1'— TYP 1"=1'-0" TYP
CS2.01
?y;��J FOR OFFICIAL USE ONLY
BUILDING PERMIT - APPLICATION DateRe�c.
Permit 13 ell
5—WF/ Fy out COMPLETELY and in INK.N our application and site plan MUST BE Date,1pproved:
COMPLETE to be accepted for review If von have any questions,call
PERMITS (360)417-481 FAX(360)417-4711 Late Issued:
Applicant or kvent. Q."A 4 A►i- Phone
f
Owner Cttx tk a w'N 7ir a A s d `JtiiS"�-Qlly� Phone , (00
Address.830 W �.Cil•�t-v�S4'.+1 B ' city,-N � �1tie4�Lt�5 Zip $363
Architect/Engineer K r e+ Air c V%i -C-+ 1 r e_ Phone: 2-53 983' G O®
Contractor TBD -84 +e 'Si ch State License# Exp Phone-
Address: City. Zip
PROJECT ADDRESS ;-2� CL I'r�ice'\ ��-'�' ZONING C
a 1
LEGAL DESCRIPTION Lot: I — 7 Block. Subdivision.
CLALL_AM COUNTY PARCEL NUMBER. M tX WV r-% 'e.
T iTE OF WORK. SIZE/VALUATION
❑ Residential )iD Nev,,Constr ❑ Re-roof ❑ Stove SF @S /SF =$
❑ Multi-family ❑ Addition ❑ Move❑ Garage SF @ S /SF =S
)L Commercial ❑ Remodel. ❑ Demolition ❑ Deck SF @ S /SF =S Q
❑ Repair E) Sip ❑ Other TOTAL VALUATION 7
BRIEF DESCRIPTION OF THE PROJECT C.L k'j a v— : CanJLf eu.>
Cie O � ej,
neuj
re. b 0—+X'64' GOO 'awl
o3 ^ 4 b t on w oWe4" QY rSc CA p� f k11z
COMMERC /RESIDENTIAL. Occupancy Group Occupant Load. Construction Type:
No.of Stones :2 Lot Size: 7q-116' Existing Sq.Ft. _&Proposed Sq Ft. A2;-MII =TOTAL Sq Ft.;Qj7'j
Total lot coverage Xa,S %
PLANNING USE ONLY APPROVALS
PLAN
BLDG
DPWU
ESA/Wetland(s) ❑Yes ❑No SEPA Checklist required? ❑ Yes ❑ No Other- FIRE.
OTHER.
VALUATION OF CONSTRUCTION In all cases,a valuation amount must be entered by the applicant.
This fibre will be reviewed and may be revised by the Building Division to comply with current fee schedules. Contact the Permit
Coordinator at 417-4815 for assistance.
PLAN CHECK FEE.IF a plan check fee is due it must be submitted at the time the building permit application and construction plans are
submitted. All other permit fees are due at the time of permit issuance.
EVIRATION OF PLAN REVIEW If no permit is issued within 180 days of the date of application,the application will expire. The
Building Official can extend the time for action by the applicant up to 180 days upon written request by the applicant(see Section
RI 05.3.2 of the International Building/Residential Code,2003). No application can be extended more than once.
1 hereby certify that 1 have read and examined this application and know the same to be true and correct. I am authorized to
apply for this permit and understand that it my responsibility to determine what permits are required not the City's, and that I
must obtain such permits prior to work. 1
T-T0RMS\B1dkPermitform.wpd Applicant: Date: av (U
� �T-s
FOR OFF]C, 'US ONn
BUILDING PERMIT - APPLICATION Datelcec. y�
G 12,
Permit W.
`--� nu out COMPLETELY and in INTK.I our application and site plan MUST BE
Dat.-Approved:
COMPLETE to be accepted for review If you have anyquestions,call Date issued:
PERMITS (360)417-481 FAX(360)417-4711
Applicant or Agent: Lti y �� �d r� ►�-��,2 C Phone.
Ou�ner'��a���a►h'� �iwGlln S r"� i Phone. 3603 4-52-' I Z1(S
Address:Sia� �.pu r%�S�•�1 L.��s City b5d A wq, I e s Zip 98,363
Architect/En-Orinee �`e+ r C C' �l w e- Phone:
Contractor 04 ♦e i State License#- Exp Phone:
Address- City. Zip
PROJECT ADDRESS 123 L� si-re- ' 9ZONIlVG C I�
LEGAL DESCRIPTION Lot: I 7 Block. Subdivision. M d e.1 a►hA 5
CLALLAM COUNTY PARCEL NUMBER. Lk
TI'PE OF WORK. SIZE/VALUATION
❑ Residential p New Constr ❑ Re-roof ❑ Stove SF @$ /SF =S
❑ Multi-family ❑ Addition ❑ Move❑ Garage SF @$ /SF =$
X.Commercial ❑ Remodel ❑ Demolition ❑ Deck SF C$ /SF =$
❑ Repair ❑ 'Sign ❑ Other TOTAL VALUATION $ 2-717,67-2
BRIEF DESCRIPTION OF THE PROJECT ale OP►' r' +a►. Ce —4e, : Can
�� Qa
ji Y• ji ra, I- PkC6 6 A51
a n o►b 1" p i 40f1 U N cs a r' Q X r5 b a•� o� �k 1�n
COMMERC /RESIDENTIAL. Occupancy Group Occupant Load. Construction Type:
No.of Stones 2 Lot Size: 79'1 I S Existmg Sq.Ft.__gj_&Proposed Sq Ft. !Z2, i =TOTAL Sq Ft.
Total lot coverage__. 'a�S %
PLANNING USE ONLY APPROVALS
PLAN
BLDG
DPWU-
ESA/Wetland(s) ❑Yes ❑No SEPA Checklist required? 13Yes 11 No
No Other- OTHER.
VALUATION OF CONSTRUCTION In all cases,a valuation amount must be entered by the applicant.
This figure will be reviewed and may be revised by the Building Division to comply with current fee schedules. Contact the Permit
Coordinator at 417-4815 for assistance.
PLAN CHECK FEE.IF a plan check fee is due it must be submitted at the time the building permit application and construction plans are
submitted. All other permit fees are due at the time of permit issuance.
EVIRATION OF PLAN REVIEW If no permit is issued within 180 days of the date of application,the application will expire. The
Building Official can extend the time for action by the applicant up to 180 days upon written request by the applicant(see Section
R105.3.2 of the International Building/Residential Code,2003). No application can be extended more than once.
1 hereby certify that I have read and examined this application and know the same to be true and correct. I am authorized to
apply for this permit and understand that it is my responsibility to determine what permits are required,not the City's, and that I
must obtain such permits prior to work.
T-T0RMS1B1dgPerrnitfotm.wpd Applicant: Date:
i
/I
CLALLAM TRANSIT SYSTEM
NOTICE TO PLANHOLDERS
ADDENDUM NO ONE (1) SEPTEMBER 19, 2006
PORT ANGELES INTERNATIONAL GATEWAY
TkANSPORTATION CENTER
The Bidder hereby acknowledges receipt of Addendum Number One (1) for-Port
Angeles International Gateway Transportation Center and this addendum hereby
becomes a part of the specifications
All bidders must submit a signed copy of this Addendum signature.-page when
submitting their `Bid Proposal' to acknowledge receipt of and compliance to"the
clarifications within this Addendum Failure to submit a signed copy of this
Addendum, with the Bid Proposal will render the bid `Non-Responsive by
definition and the bid will be reiected in its entirety
ACKNOWLEDGED
Bidder's Signature
Firm Name _
Date '4
�.<_sr•
Port Angeles International,Gateway Addendum One (1)—Page 1 of 4
Transportation Center'
i
v
Responses to Questions received as of September 18, 2006
1 1 Q The building elevations sheet A2 01 have what appears.to be Portland
Cement Plaster at the base below the brick, is this correct?
A. No it is sandblasted concrete typical as indicated on elevation 4 The
walls at the entrance to the restrooms shown on elevation 3 are Portland Cement
Plaster as indicated
1 2 Q Is the Portland Cement Plaster a system?
A. Yes refer to Specification Section 09220 Portland Cement Plaster
1 3 Q Is the Additive B Pavilion an open air' structure?
A. Yes
1 4 Q Specification Section 08630 Metal - Framed Skylights references Section
08800 Glass and Glazing, but does not indicate what type of glazing, correct?
A. No Section 08630 2 3 Glazing Materials indicates insulating glazing
Section 08800 1 06, D defines Insulated Glass Units
1 5 Q What is the estimated cost of the project?
A. Base Bid is approximately $4 5 million Additive A approximately $2
million Additive B approximately $450,000 and Additive C approximately
$130000
Changes to Procurement Requirements
1 6 A mandatory pre-bid conference and site visit will be held at the offices of
Clallam Transit System 830 W Lauridsen Blvd Port Angeles WA, starting at 10
AM and ending with site visit at approximately 1 PM on October 17 2006
All General Contractors bidding the project must sign in for both the pre-bid
conference and site visit.
Changes to Specifications
1 7 Entire Specification as Listed in SECTION 00010 TABLE OF CONTENTS -
Change all references to ARCHITECT' to 'OWNER' —The term Owner' means
the 'Owner" or Owner's representative
The City of Port Angeles or their authorized representative will manage the
construction administration process for THE WORK and THE PROJECT as
required and performed under the Contract Documents. The ARCHITECT and
their subconsultants will be 'On-Call' to the Owner for the length of the Contract.
Port Angeles International Gateway Addendum One(1)—Page 2 of 4
Transportation Center
Changes to Drawings
1 8 Sheet BA1 02 Roof Plans Detail 1 Skylight Plan, change detail
references at ridge and curb to reflect detail 2 at curb and detail 3 at
ridge Revised drawing will not be provided in addendum
1 9 Sheet Al 04 Finish Plan — Ceilings in Fire Riser Room 22 and
Mechanical/Electrical Room 16 are open to structure per Sheet A7 01
Reflected Ceiling Plan Delete C2 from the legend for each of those
rooms Revised drawing will not be provided in addendum
1 10 Sheet A8 03 Elevations 1 Women's Restroom — Room 14 wall 1
and 2 Men's Restroom — Room 15 wall 3, delete reference to FRP
Walls are Portland Cement Plaster as indicated on sheet Al 04
Finish Plan Revised drawing will not be provided in addendum
1 11 Sheet A3 06 Enlarged Masonry Plans, Sections & Elevation,
Section 2 Wall Section @ Masonry, detail references B2/A4 03 &
C3/A4 03 should be referenced to sheet A6 03 Revised drawing will
not be provided in addendum
1 12 Sheet A3 06 Enlarged Masonry Plans, Sections & Elevation,
Section 3 Wall Section @ Masonry, Reference to "Metal Panels"
should be changed to "Portland Cement Plaster" Revised drawing
will not be provided in addendum
1 13 Sheet MO 01 Schedules & Legend Mechanical — In AIR
HANDLING UNIT SCHEDULE at "FILTERS" revise note 4 to be note
3 Revised drawing will not be provided in addendum
1 14 Sheet.M1 01 Site Plan Mechanical — Plan Notes delete text of
note 13 and add note "See Architectural site plan for extents of
paving and planters" Revised drawing will not be provided in
addendum
1 15 Sheet M1 01 Site Plan Mechanical — Plan Notes add to note 2,
"Connect to 6" fire line shown on C2 08 Provide thrust blocks at
changes in direction The final connection is to be made by
Mechanical Contractor " Revised drawing will not be provided in
addendum
1 16 Sheet AM1 01 Additive A Parking Garage — Mech — Add the
following to fire riser note "Connect to 6" fire line shown on C2 08
Port Angeles International Gateway Addendum One (1)—Page 3 of 4
Transportation Center
A
Provide thrust blocks at changes in direction The final connection is
to be made by Mechanical Contractor " Revised drawing will not be
provided in addendum
1 17 Sheet EO 01 Legend/Schedules Abbreviations — FIXTURE
SCHEDULE — Change 1 Light fixture catalog number for S1 to FP
166 R INV 70S 120 2 Light fixture catalog number for S3 to NT 500
H70 120 3 Light fixture catalog number for T to PM24cb 250 AL
Revised drawing will not be provided in addendum
1 18 Sheet E1 01 Site Plan Electrical — Plan Notes add note "See
Architectural site plan for extent of paving and planters " Revised
drawing did not add this note in addendum
1 19 Sheet E1 01 Site Plan Electrical — On the Overall Site Plan add
GFCI weatherproof receptacles to all S1 light fixture poles, mount
receptacles 10'-0" above plaza elevation 22'-0" per Port Angeles
standards See Drawings E1 01 and E4 01 provided in this
addendum for circuits
1 20 Sheet E2 01 Transit Building Power Plan — 1 Add circuit 36 to
callout for WH-1 located in Janitor Room 19 2 Change
platform/stage receptacles and homerun callout from S/33 to S32
3 Delete heat trace junction box/conduit for circuit B/43 in
Mechanical/Electrical Room 16 Revised drawing will not be provided
in addendum
1 21 Sheet E3 01 — Transit Building Lighting Plan — Change interior
lights homerun to just B/1 , eliminating circuit 3, therefore revising
those fixtures indicated on circuit 3 to change to circuit 1 Revised
drawing will not be provided in addendum
1 ,22 Sheet E4 01 — Panel Schedules Single Line Diagram — See
drawing provided in this addendum, includes Panels and Load
Calculation revisions
1 23 Sheet BE1 01 — Additive B Pavilion — Change "T" fixtures from
circuit 49a to 29a
END OF ADDENDUM NO ONE (1)
Port Angeles International Gateway Addendum One (1)—Page 4 of 4
Transportation Center
(1)2•C,O.�FOR FIBER
TERMINATE AT UTILITY POIE
! Q +10'-0 / � PLAN NOTES
FIELD FY EXACT LOCATE
Oj EXISTING TELEPHONE AND CABLE TV PEDESTALS RELOCATED BY UTILITY.
i 4 11 8
/ I .I EXISTING 150KVA.208/120V TRANSFORMER RELOCATED BY ELECTRIC ;3
--- I UTILITY. m $
I I• 1 I O FUTURE.SECURITY CAMERA I.C.O.FROM TRANSIT BUILDING ^�a
J I I I POLICE OFFICE(RM 13)TO POLE BASEMINI
i
INSTALL NEW FIXTURE/POLE EXTEND AND RECONNECT T EXISTING DED.
LIGHTING CIRCUIT. EXTEND CONDUIT/CONDUCTORS AS NEEDED. ,g
1 O X39 H
j i Q r 1 I I I O$ LIGHTING AND POWER TO BE DESIGN/BUILD BY CONTRACTOR L a
/ <
4 i .� FIXTURE/POLE TO BE DELETED/NOT INSTALLED IF ADDITIVE B- 2 PS$
PAVILLION IS INCORPORATED INTO PROJECT. 1 09 1"1 g
EXIST! O 521 •—J� I -I BUILD G I I I
BUILDING
BU a"
- Oil - �
4 I / gQ2)?"C.O.
@� 1n
I
1 Ll
1 El
Eli m
C.0 TO
I I I 4 13 ECH C RN 1
10'-0•
X10
I1
9
I0 1 1 1 ! 8 0
I /
pua
j 3 St A _0 I CC
2
--- }-- — -- - _
C13 p
I I I 1 D i
v
— -• NUED TINUED ON
E E1.1 ET.10 Q
6 r- i" (D (-.-) 15
-- -i -- - ---I E G C c
S) 39 1 I co .� O
0•
CD.2
Q�o�ID`O
k�r
c
z
6 O +10' LLI
U
0- _PAVILI 39 3
co
TRAJT n
z S1 1 o
- � ---- - Z
6-
.0
U
_
S/67. /20m06 39
10
3z
(2) #6
'
Si +10-0
_I IXPRES:'7
Project Na 7013116401
THR LIGHTNG PLAZA 6 '
"II Issue 09119/06
I. \ CON ACTOR MECL
9.06 AddenAnn No.t
�6 ry 6 Lo) 6 —
+0'_0• AFF- -
A IF
- _ AFF FF q ._
q i
FRONT STREET j
OVERALLSITE PLAN ELECTRICAL Site Plan
Electrical
E1.01
t
E
S 3 H
s — s sus ss ss ss —ss s ss ss
2+06ss Sg3$ 8
i �2 2+r 0� - ��_ - R 3+00 1- - R 4+00 ss- R 5+00
- --------�—- i1JIN i
RAILROAD AV
\
o--,—, P P - P P P P Q
W G WATERLINE
W_ W W W W W ly 4g3
W
--T T T T T T T < y
W W W W W _ — W W W " W W r 2 g
❑ � 3rE 5�
fl
�p g C 8{
��9 N a 13 Sid as
op Il N o
5 1 SD
7 6 #
E "
PARKING
GARAGE
(ADDITIVE BID A) S A R Ila 3
o
3 8 8
Q SEE�SHEET 08 FOR
D UTILITY CONT NUATION O a I
A 2 3
o I 152 LF 6" o
~ N?I PERF PVC 3 +tI
CB JLL019.1 N
RIM 10.5 Zi
124 LF 2" 6
DISCHARGE SD1 j I t
'- 26 LF LLI11 cc
° 6"PERF' 3 N
/ PVC O CQ o Z
1 23 LF 6" '
Ld I IE 8.30 PERF PVC a J I �
O
Z " ca
_-_ U c
�T �'� O I I Z_ I 'SO O i v
J T 72 LF C Q
PE FP ? E
FOOTING DRAIN, \ 64 LF { (DU
T SEE DETAIL 4 —— — -8"PVC- — — — — " 10 N
1 I I IE 6.30 GATEWAY
-DOTING DRAIN N v
5 EE DETAIL 4
PLAZA OUTLINEcm
4 I (ABOVE) 13a 5 CONSTRUCTION NOTES
-4c N
0o I I IE 6.52 I + 4 (D CAP EXIST SANITARY SEWER LINE =Q v
CL
T ITRANSIT Ice #14 IE 6.90 CB.415 I(1 H m
= 1 I BUILDING TRIM 8.60 IE 6.62 RIM 8.60 I I O2 INSTALL 8" CLEAN OUT
II li 3
3 REMOVE EXISTING CATCH BASIN, DELIVER E bac
I I 3 GRATE AND FRAME TO CITY INSTALL
CONNECTD TOI- 35 LF 56 LF I D TYPE 2 CATCH BASIN WITH FRAME AND c�
FOOTING IN 1 6"PVC 8"PVC 32 LF SOLID COVER AND STORM WATER PUMP
1 L— S=0.5% 6"PVC I " PER DETAIL 4
63 LF 6" ERF 1 4
7 1 PVC ---- -1 CONNECT SD T'),
F0077NG DRAIN 63 LF 6" O PLAZA DRAIN CONNECTION AT PLAZA
LF a gPE PV I G 4AIH
SD Eo.
SD PVC STREET TO RETAINING WALL.FROMEL 20.OTO
SWEEPER EL 7.00, CONNECT TO 6"FOOTING DRAIN ISOIU9 No. 7013116001
_ ENCLOSURE ISsuB 09N9196
OREMOVE EXIST 8"SEWER LINE _ 1�„ ,
s D 1
o P° 4 O STORMWATER OVERFLOW. _ AddendumNo.1
WCONNECT SEE DETAIL Ot T 8' SS. _
9 7
0
E FRONT STREET I O END 6"PVC SD AND TEMPORARY CAP
F 6+OF 7+00 F—LINE8+003 O TRANSFORMER. SEE ELECTRICAL SHEETS
0 0 - - - F
PLAN O DRILL 2"DIA HOLES IN EXISTING WALL,
SCALE. 1"=20' 6"ABOVE FINISHED FLOOR ELEVATION,
ss AT 5' ON CENTER
SD D
-W 10 PLAZA AND TRENCH DRAIN CONNECTION Lower Level
ss— 55 d' S5 8 ss ss ss- ¢ ss ss St SD °O 1X AT PLAZA LEVEL.4"DI VERTICAL DRAIN On-Site Utility Plan
ss 5s —� ATTACHED TO RETAINING WALL. FROM
W W W W r W T—W�WW EL 120.0 TO EL 7.00, CONNECT TO
I r r r r i 7 r 7 17 r r . i r i i r i i i I- �^� , ,-, 6'FOOTING DRAIN C2, 09
raoec eq 1S,a100-aasAn aww.�aeoeo;ewtsss
I
i
Q t"S.A:Z11Vd=1uvsajejo5aej!�Jao� L m� � bJExE 1rst!INUt:?G 'ufie pp�mpVlu��uj�� ym�
IG113In or
1n M In 6 8 A
In�
� � w
V Neo ��C � C C C C S r S S SAOOr� C
rs P1
D N uNIII c �„P
�2a23»1tFSfSfS "d 92i t5 gt f5 t '89112i23>
ps 8t m
> m> > .s
n n see n n n n m n
n n n
8 8 � � o 2i 2i2Z8d^d2S2dB2Z2S9B2 S� 081
8a8dBdddd23add
Paz
r I= P� P'r P r P P P P r r•r•P P P r EE
1-a
C O O ~ C
H-1
O O C C A A A>H-1.A A
11
00
$0 1 � EiRf$ w >QpQ ppQQp
vgP'. ao � �41M 4i �y'y y'oo`y y yy w
A � EI I
Y' So. SQ y� 4I CI X8'.6 Q as S2
ash S cls � (2ri�� �,l't. g cls
z
m I � U IRS
�� RR3�o`!e`trr:.o&'$kN8'f6Ff,X'Y�'$'�$,1'+� Nfaf6ib'kk+£S�mrf30'mo.kNomo.aN�
00 n: ;uA-Vuw�� Ny
52 Vj
9 11
7
S 66a
O N ++
p C 00 C p AAA r A r ddd r
Vl '8NE faHz 250 tnHHHi3SP S075 a
6
M r > > > > >
> m m m m m m m
np 19 � rLL�
I=
�� C) 110 r CCCAAA.SAAA AAAOCrrrr
0 gig
NM Z' N teAi�ia'>'>'s'si>' $ coca
a®Ll
Lit' il is
i
Structure]Erg Tres est owner krei architecture
Port Angeles International Gateway BroM Enpneerbp Tree West Enpineere Clry of PoA Arpelee
O CD $ Q C 2058253771 2534723300 3804174803 Base Bk BAddRveA
s Transportation Center
my m CNA Ekhtcel oweer Corporate Address: Project Oft A&MM
0 i1 '� G u r$ Pwenw85r Tree Weal Enowns Odw Tranell System 5814 Graham Avenue,Supe 200 Paremei bt
s0C 360 377 0014 253 4723300 3604521315 P.O.Baa 480 4880 K bap Way Sub A
c �I M �?A Sumne Washki 98390 Bremerlan,Wa iglon 98312
C� u+ 4fR Landscape Bona Engineer ArcNbct Adds.BBC 2538835128 tebphow 3603770014 telephone
3 Parei Landau Associates Uri a Brift 2538&17398 favi 360 476 5981 fars5n5e
Bid&Construction Set Addendum No.1 4254588200 2539252493 3804525118 www.kndarchitectureua wwwyeremeh6uom
i
r
5814 Graham Avenue,Suite 200 Sumner Washington 98390 telephone 360 377 0014 facsimile 360 479 5961
krel architecture
Transmittal
To City of Port Angeles
Attn Mr Gary Kenworthy, Project Manager
321 East Fifth Street
P O Box 1150
Port Angeles,WA 98362-0217
From Stan Cruse, AIA, LEED v.2 AP
Date August 29, 2006
Project Port Angeles International Gateway Transportation Center
Project No 701 3116-001
cc File
This is For Your Use
Sent via Express Overnight
Copies Dated Description
1 25 August 2006. Washington State Energy Code Compliance Forms
1 25 August 2006 Structural Calculations
Comments
These documents are to be used in the permit submittal
Please call if you have any questions
www.kreiarchitecture.us
Washington State
Energy Code
Compliance
Port Angeles
International Gateway
Transportation Center
August 25, 2006
G Y
3130
IST
SSIONAL �G
EXPIRES 516,1-2,o0-?
PREPARED BY
KREI ARCHITECTURE
TRES WEST ENGINEERS,INC.
2702S42 NO STREET SUITE 301
TACOMA,WA 98409
253-472 3300
253-472 3463
2004 Washin ton State Nonresidential Ener Code Com fiance Form
' Envelope �qj •
2004 Washington State Nonresidential Energy Code Compliance Forms Revised May 2005
Project Info Project Address PA international Gateway Transportation Center Date 8/21/2006
123 East Front Street For Building Department Use
Port Angeles Washington 96362
Applicant Name: Tres West Engineers Inc
Applicant Address: 2702 S 42nd Street Suite 301 Tacoma, WA 96409
Applicant Phone 253-472-3300
Project Description ®New Building [3Addition 0 Alteration Q Change of Use
Compliance Option Q Prescriptive ®Component Performance Q Systems Analysis
(See Decision Flowchart(over)for qualifications)
Space Heat Type 0 Electric resistance 19 All other (see over for definitions)
Total Glazing Area Electronic version: these values are automatically taken from ENV-UA-1
Glazing Area Calculation (rough opening) Gross Exterior
Note.Below grade walls may be included in (vertical&overhd) divided by Wall Area times 100 equals %Glazing
the Gross Exterior Wall Area if they are
insulated to the level required for opaque 308 0 — 2498 0 X 100 = 12 3%
0 yes Check here if using this option and if project meets all requirements for the Concrete/Masonry
Concrete/Masonry Option Option. See Decision Flowchart(over)for qualifications. Enter requirements for each
111111 no qualifying assembly below
Envelope Requirements(enter values as applicable) Opaque Concrete/Masonry Wall Requirements
Fully heated/cooled space Wall Maximum U-factor is 0.15(R5 7 continuous ins)
Minimum Insulation R-values CMU block walls with insulated cores comply
Roofs Over Attic If project qualifies for Concrete/Masonry Option, list walls
All Other Roofs R-30 with HC>_9.0 Btu/ft2•°F below(other walls must meet
Opaque Wall requirements) Use descriptions and values
Opaque Walls R-19 from Table 10-9 in the Code.
Below Grade Walls Wall Description U-factor
Floors Over Unconditioned Space R-38 (including insulation R-value&position
Slabs-on-Grade R-10
Radiant Floors
Maximum U-factors
Opaque Doors U-0 6
Vertical Glazing U-0 55
Overhead Glazing
Maximum SHGC(or SC)
Vertical/Overhead Glazing
Semi-heated space
Minimum Insulation R-values
Roofs Over Semi-Heated Spaces2
1 Assemblies with metal framing must comply with overall U-factors
2. Refer to Section 1310 for qualifications and requirements
Notes
2004 Washington State Nonresidential Eneray Code Com fiance Form
Envelope UACalculations Climate Zonel '
2004 Washington State Nonresidential Energy Code Compliance Forms _ Revised May 2005
Project Address PA International Gateway Transportation Center Date 8/21/2006
Space Heat Type 0 Electric resistance All other For Building Department Use
Glazing Area as%gross exterior wall area 12 3% Prop 45 0% Max.Target
Concrete/Masonry Option O Yes • No
Notes. If glazing area exceeds maximum allowed in Table,then calculate adjusted areas on back(over).
Building Component Proposed UA Target UA
List components by assembly fD&page# U-factor x Area(A) =UA(U x A) U-factor x Area(A) =UA(U x A)
U=0 560 Plan ID- 0 560 308 0 172 5 0 550 308 0 169 4
U= Plan ID, Glazing% Electric Resist. Other Heating.
rn U= Plan ID- 0-30% 0.40 0.55
.E N U= Plan ID- >30-45% see note above 045
> U= Plan ID-
U= Plan ID-
I
U= Plan ID-
U= Plan ID- 0 700
U= Plan ID- Glazing% Electric Resist. Other Heating
M > U= Plan ID- 0-30% 0.6 0.7
v O U= Plan ID- >30-45% see note above 0.6
r ,Wn U= Plan ID:
0 I0 U= Plan ID-
0 = U= Plan ID-
U= Plan ID- 0 700
U=0 600 Plan ID, 0 600 105 0 63 0 0 600 105 0 63 0
CX
$ U= Plan ID- Electric Resist. Other Heating
0 U= Plan ID- 0.60 0.60
o 6 R= Plan ID- 0 036
jX O R= Plan ID- Electric Resist. Other Heating
R= Plan ID- 0.031 0.036
R=38 0 Plan 1D- 0 036 1677 0 60 4 0 046 1677 0 77 1
L $ R= Plan ID- Electric Resist. Other Heating
0: R= Plan ID- 0.034 •0:046
R=21 0 Plan ID- 0 047 2085 0 98 0 0 062 2085 0 129 3
R= Plan ID- **
R= Plan ID- **
m
m
R= Plan ID- Electric Resist. Other Heating
Q R= Plan ID- Frame-Wd 0.062 0.062
o R= Plan ID- Frame-Mtl 0.062 0.109
R= Plan ID- Mass Wall++ 0.15 0.15
*Note sum of Target Areas here should equal Target Opaque Wall Area(see back) ++see mass wall Criteria
R= Plan ID-
0 R= Plan ID- Electric Resist. Other Heating
m m R= Plan ID- Int Ins. 0.062 0.062
0 Note:if insulated to levels required for opaque walls,list above with opaque walls Ext Ins 0.07 0.07
L R=38 0 Plan ID- 0 059 476 0 28 1 0 056 476 0 26 7
0 R= Plan ID, Electric Resist: Other Heating
o c R = Plan ID- 0.029 0.056
LL =) JR= Plan ID-
Dv
R=10 0 Plan ID- 0 540 190 0 102 6 0 540 190 0 102 6
4 -
m R= Plan ID- Electric Resist. Other Heating
R= Plan ID- 'F=0.54 F=0:54
R= Plan ID- (see Table 1'3-1 for radiant floor values).
*For CMU walls, indicate core insulation material. Totals 4841 0 524 5 Totals 4841 0 568 1
To comply- 1)Proposed Total UA shall not exceed Target Total UA.
2)Proposed Total Area shall equal Target Total Area.
2004 Washington State Nonresidential EngW,Code Compliance Form
Climate •
2004 Washington State Nonresidential Energy Code Compliance Forms Revised May 2005
Glazing Proposed SHGC Target SHGC
List components by assembly ID&page# SHGC' x Area(A) =SHGC x A SHGC x Area(A) =SHGC x A
ID' 0 450 308 0 138 6 0 450 308 0 138 6
o, ID' Glazing% Electric Resist. Other Heating
c
ID' 0-30% 04 045
ID' >30-45% not allowed 04
ID'
ID'
*Note,Manufacturer's SC may be used in lieu of SHG(
Totals 308 0 138 6 Totals 308 0 138 6
For compliance Proposed total SHGC x A shall not exceed Target total SHGC x A
NOTE: Since 1997 SHGC compliance for vertical and overhead glazing is allowed to be calculated together
TargetAdjustment Calculations
If the total amount of glazing area as a%of gross exterior wall area(calculated on ENV-SUM1)exceeds the maximum allowed in Table 13-1
then this calculation must be submitted Use the resulting areas in the Target UA and SHGC calculations above.
Proposed Areas. Numbered values are used in calculations below
Roofs over Attics Other Roofs Walls
Note:
OG= VG= 308 0
Glazing Area OG= OG=overhead glazing
OpaqueAreal 1677 0 2085 0 VG=vertical glazing
Gross Exterior Wall Max Glazing Area Maximum Target
Area (Table 13-1) Glazing Area
2498 0 X 45 0% — 100 = 1124 1
Target OG Area in Roofs over Attics Target OG Area in Other Roofs
Max OG Remaining Tar et VG Area For Target OG's,the
1124 1 — a lesser = 1124 1 —
II lesser 308 0 lesser values are used
1124 1 \ 1124 1 I, both here and below
Pro os ed O a ue Area Proposed OG Area y Target OG Area`+' Tar et O a ue Area
Roofs over Attics + —
Other Roofs 1677 0 +
Pr osed Opaque Area Proposed VG Area Target VG Area Tar et Opaque Area
Walls 2085 0 1 + 308 0 — 308 0 = 2085 0 Target Areas OK
Note: If there is more than one type of wall,the Target VG Area maybe distributed among them,and separate Target Opaque Areas found.
If the Target Areas for Opaque Walls listed on the front must equal the total calculated here.
Target values in shaded boxes are used in the applicable Target UA calculations on the front.
Target VG Area and Total Target OG Area are also used in the applicable Target SHGC calculations above.
2001 Washington State Nonresidential Energy Code Compliance Form
Lighting Summary
2001 Washington State Nonresidential Energy Code Compliance Forms June 2001 KJM
Project Info Project Address PORT ANGELES GATEWAY TRANSPORTATION CENTER Date 8/21/2006
123 East Front Street For Building Department Use
Port Angeles Washington 98362
Applicant Name: TRES WEST ENGINEERS INC
Applicant Address: 2702 S 42ND ST SUITE 301 TACOMA WA 98409
Applicant Phone: 253-472 3300
Project Description ® New Building Q Addition Q Alteration Q Plans Included
Refer to WSEC Section 1513 for controls and commissioning requirements.
Compliance Option 0 Prescriptive 0 Lighting Power Allowance 0 Systems Analysis
(See Qualification Checklist(over).Indicate Prescriptive&LPA spaces clearly on plans.)
Alteration Exceptions Q No changes are being made to the lighting
(check appropriate box) Q Less than.60%of the fixtures are new and installed lighting wattage is not being increased
Maximum Allowed Lighting Wattage (Interior)
Location Allowed
(floor/room no.) Occupancy Description Watts per if Area in if Allowed x Area
OFFICE 1 00 2970 0 2970 0
From Table 15-1 (over) document all exceptions on form LTG-LPA Total Allowed Watt2970 0
Notes:
1 Use manufacturer's listed maximum input wattage. For hard-wired ballasts only the default
table in the NREC Technical Reference Manual may also be used
2.Include exit lights unless less than 5 watts per fixture.
Proposed Lighting Wattage (Interidr}ist all fixtures.For exempt lighting,not exception and leave Watts/Fixture blank.
Location Number of Watts/ Watts
(floor/room no.) Fixture Description Fixtures Fixture Proposed
1 X 4 FLOURESCENT 8 61 0 488 0
2 X 4 FLOURESCENT 10 61 0 610 0
RECESSED DOWNLIGHT 11 37 0 407 0
RECESSED DOWNLIGHT 6 69 0 414 0
Total Proposed Watts may not exceed Total Allowed Watts for Interior Total Proposed Watts 1919 0
Maximum Allowed Lighting Wattage (Exterior)
Allowed Watts Area in ft' Allowed Watts
Location Description per fl?orer If
p (or If for perimeter) x fl?(or x If)
Covered Parking
(standard paint) UNDERGROUND PARKING GARAGE 0.2 W/ff 15642 0 3128 4
Covered Parking 0.3 W/flz
(reflective paint)
Open Parking 0.2 W/ft2
Outdoor Areas PAVILION/SITE 0.2 W/f? 83830 0 16766 0
Bldg.(by facade) 0.25 W/fF
Bldg.(by perim) 7.5 W/If
Note-for building exterior choose either the facade area or the perimeter method,but not both) Total Allowed WaftE 19894 4
Use mfgr listed maximum input wattage For fixtures with hard-wired ballasts only
Proposed Lighting Wattage (Exterior) default table in the NREC Technical Reference Manual may also be used.
Number of Watts/ Watts
Location Fixture Description Fixtures Fixture Proposed
Covered park PENDANT HPS 1 9 188 0 1692 0
Covered park 1 X 4 FLOURESCENT 6 61 0 366 0
PAVILLION PENDANT METAL HALIDE 13 295 0 3835 0
PAVILION TRACK 1 1800 0 1800 0
2001 Washington State Nonresidential Energy Code Compliance Form
SITE S1 - HPS 22 87 0 1914 0
SITE S2 - HPS 9 250 0 2250 0
SITE S3 — HPS 5 87 0 435 0
SITE S4 — LED 8 11 0 88 0
Total Proposed Watts may not exceed Total Allowed Watts for Exterior Total Proposed Watts 12380 0
2004 Washin ton State Nonresidential EQgW Code Com fiance Form
Mechanical Summary MECH-SUMI
2004 Washington State Nonresidential Energy Code Compliance Forms ``+p Revised May 2005
Project Info Project Address PA International Gateway Transportation Center Date 8/21/2006
123 East Front Stiieet For Building Dept. Use
Port Angeles WA 98362
Applicant Name. Tres West Engineers Inc
Applicant Address. 2702 S 42nd Street Suite 301 Tacoma WA 98409
Applicant Phone: 253-472-3300
Project Description Split system heat pump (air handler in ceiling space and heat pump
Briefly describe mechanical on rood with economizer capability
system type and features.
®Includes Plans Drawings must contain notes requireing compliance with commissioning requirements Section 1416
Compliance Option 40 Simple System 0 Complex System O Systems Analysis
(See Decision Flowchart(over)for qualifications. Use separate MECH-SUM for simple&complex systems.)
Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the
plans. For projects without plans,fill in the required information below
Cooling Equipment Schedule
Equip Capacity2 OSA CFM SEER
ID Brand Name' Model No.' Btu/h Total CFM or Econo? or EER IPLV3 Location
HP-1 Trane 2TWA3048A3 57300 N/A N/A 13 00 N/A MO 01
AHU-1 Trane 2TEC3F60 57300 1600 ECONO N/A N/A MO 01
Heating Equipment Schedule
Equip Capacity2 OSA cfm
ID Brand Name' Model No.' Btu/h Total CFM or Econo? Input Btuh Output Btuh Efficient 4
HP-1 Trane 2TWA3048A3 34450 N/A N/A N/A N/A N/A
AHU-1 Trane 2TEC3F60 34450 1600 ECONO N/A N/A N/A
Fan Equipment Schedule
Equip
ID Brand Name' Model No.' CFM SP1 HP/BHP Flow Control Location of Service
EF-1 COOK GN-520 250 0 50 0 17 CV MEN
EF-2 COOK GN-520 250 0 50 0 17 Cv WOMEN
EF-3 COOK GC-144 751 0 50 0 10 Cv TOILET
EF-4 COOK GC-145 75 0 50 0 10 CV TOILET
EF-5 COOK GC-142 22 0 50 0 10 CV JANITOR
EF-6 COOK 90W15DH 150 0 50 0 13 CV ELEVATOR MACHINERY
�If available. s As tested according to Table 14-1A through 14-1G. 3 If required. a COP HSPF Combustion Efficiency or AFUE,as
a
applicable. Flow control types.variable air volume(VAV) constant volume(CV) or variable speed(VS)
2004 Washington State Nonresidential Enerav Code Com fiance Form
Medhanical Summary (back) MECH-SUM
System Description If Heating/Cooling ® Constant vol? Q Air cooled? 0 Packaged sys?13<20 000 Btuh?
See Section 1421 for full description or Cooling Only- 0 Split system? 0 Economizer included?
of Simple System qualifications. If Heating Only- 13 <5000 cfm? [3<70%outside air?
Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not,either the
Complex System or Systems Analysis Options must be used.
START
Heating/Cooling Air Cooled,
System Type or Cooling Only Constant Vol. No
Reference
Heating Only Section 1421Ye
<5000 ingle plit Syste
cfm? Yes Package N —84,000 N
Yes Unit? Btuh?
No Ye
of Ca Outd s
<70%OSA Ye Econo No-t.- <20,000 NO,-
of Ye
Included. Btuh? Adjacent to
utdoor
Yes Yes
Reference No
Section 1423
ool Ca
Yes--
e <54 000 N
Btuh?
otal Ca .
wo economize N
<240,000 Btuh
r 10%?
Simple System Yes
Allowed
(section 1420)
Use Complex
11111 Systems
(section 1430)
Complex Systems Refer to MECH-COMP Mechanical Complex Systems for assistance in determining which
Complex Systems requirements are applicable to this project.
2004 Washington State Nonresidential Energy Code Compliance Form
PermitMechanical
2004 Washington State Nonresidential Energy Code Compliance Forms Revised May 2005
Project Address PA International Gateway Transportation Center Date 821/2006
The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the
Washington State Nonresidential Energy Code.
ApplicabilityCode Location Building Department
(yes,no,n.a.) Section Component Information Required on Plans Notes
HVAC REQUIREMENTS(Sections 1401 1424)
1411 Equipment performance
yes 14114 Pkg.elec.htg.&clg. List heat pumps on schedule Mo 01
yes 1411 1 Minimum efficiency Equipment schedule with type,capacity efficiency Mo 01
a 1411 1 Combustion htg. Indicate intermittent ignition,flue/draft damper&jacket loss
1412 HVAC controls
yes 1412.1 Temperature zones Indicate locations on plans M2 01
yes 1412.2 Deadband control Indicate 5 degree deadband minimum 15900
a 1412.3 Humidity control Indicate humidistat
yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff.day types 15900
yes 1412.4 1 Dampers Indicate damper location and auto.controls&max.leakage M2 01
yes 1412.4.2 Optimum Start Indicate optimum start controls 15900
yes 1412.5 Heat pump control Indicate microprocessor on thermostat schedule 15900
a 1412.6 Combustion htg. Indicate modulating or staged control
yes 1412.7 Balancing Indicate balancing features on plans 142 01
yes 1422 Thermostat interlock Indicate thermostat interlock on plans M2 01
yes 1423 Economizers Equipment schedule Mo 01
1413 Air economizers
yes 1413.1 Air Econo Operation Indicate 100%capability on schedule Mo 01
• a 14131 Wtr Econo Operation Indicate 100%capacity at 45 degF db&40 deg F wb
• a 1413.2 Water Econo Doc Indicate clg load&water econoe&clg tower performance
yes 1413.3 Integrated operation Indicate capability for partial cooling 15900
a 1413.4 Humidification Indicate direct evap or fog atomization w/air economizer
1414 Ducting systems
yes 14141 Duct sealing Indicate sealing necessary 15810
yes 1414.2 Duct insulation Indicate R-value of insulation on duct 15082
yes 1415.1 Piping insulation Indicate R-value of insulation on piping 15086
1416 Completion Requirements
yes 1416 1&2 Drawings&Manuals Indicate requirement for record drawings and operation docs. 15010
yes 1416.3.2 Air Balancing Indicate air system balance requirements 15950
a 1416.3.3 Hydronic Balancing Indicate hydronic system balance requirements
yes 14164 Commissioning Indicate requirements for commissioning and prelim.Report 15050
yes 1424 Separate air sys. Indicate separate systems on plans M2 07
yes Mechanical Completed and attached. Equipment schedule with types,
Summary Form input/output,efficiency,cfm,hp,economizer
SERVICE WATER HEATING—ANDFREATED POOLS (Sections 1440-14541
1440 Service water htg.
yes 1441 Elec.water heater Indicate R-10 insulation under tank MO 02
yes 1442 Shut-off controls Indicate automatic shut-off 15480
yes 1443 Pipe Insulation Indicate R-value of insulation on piping 15086
a 1452 Heat Pump COP Indicate minimum COP of 4 0
a 1452 Heater Efficiency Indicate pool heater efficiency
a 1453 Pool heater controls Indicate switch and 65 degree control
a 1454 Pool covers Indicate vapor retardant cover
e 1454 Pools 90+degrees Indicate R-12 pool cover
It no is circled or any question, provide explanation
2004 Washington State Nonresidential Energy Code Compliance Form
Building Permit Plans Checklist ENV-CHK
2004 Washington State Nonresidential Energy Code Compliance Forms Revised May 2005
Project Address PA International Gateway Transportation Center Date 9/21/2006
The following information is necessary to check a building permit application for compliance with the building envelope requirements in the
Washington State Nonresidential Energy Code.
Applicability Code Location Building Department
(yes,no,n.a.) Section Component Information Requirec on Plans Notes
GENERAL REQUIREMENTS (Sections 1301-1314)
1301 Scope Unconditioned spares identified on plans if allowed
yes 1302 Space heat type: M1 01
Other If'Other'
indicate on plans that electric resistance heat is not allowed
n a 1310.2 Semi-heated spaces Semi-heated spaces identified on plans if allowed
1311 Insulation
yes 1311 1 Insul.installation Indicate densities and clearances A3 06
yes 1311.2 Roof/ceiling insul. Indicate R-value on roof sections for attics and other roofs; A3 06
Indicate clearances for attic insulation;
Indicate baffles if eave vents installed;
Indicate face stapling of faced batts
yes 1311.3 Wall insulation Indicate R-value on wall sections;
Indicate face stapling of faced batts; A3 06
Indicate above grade exterior insulation is protected;
Indicate loose-fill core insulation for masonry walls as necess;
Indicate heat capacity of masonry walls
if masonry option is used F73;
yes 1311 4 Floor insulation Indicate R-value on floor sections; A3 06
Indicate substantial contact with surface;
Indicate supports not more than 24' o.c.
Indicate that insulation does not block
airflow through foundation vents
yes 1311.5 Slab-on-grade floor Indicate R-value on wall section or foundation detail; A3 06
Indicate slab insulation extends down vertically 24' from top;
Indicate above grade exterior insulation is protected
n a 1311 6 Radiant floor Indicate R-value on wall section or foundation detail;
Indicate slab insulation extends down vertically 36' from the top;
Indicate above grade exterior insulation is protected;
Indicate insulation also under entire slab where re 'd.by Official
yes 1312 Glazing and doors Provide calculation of glazing area(including both vertical
vertical and overhead)as percent of gross wall area ENV-suml
yes 1312.1 U-factors Indicate glazing and door U-factors on glazing and door 8110
schedule(provide area-weighted calculations as necessary); 8520
Indicate if values are NFRC or default,if values are default 8800
then specify frame type,glazing layers,gapwidth,low-e GO 03
coatings, as fillings
yes 1312.2 SHGC&SC Indicate glazing solar heat gain coefficient or shading 8110
coefficient on glazing schedule(provide area-weighted 8520
calculations as necessary) 8800
GO 03
1313 Moisture control
yes 1313.1 Vapor retarders Indicate vapor retarders on warm side A6 02
A6 03
GO 03
07260
yes 1313.2 Roof/ceiling vap.ret. Indicate vapor retarder on roof section; A6 02
A6 03
GO 03
Indicate va .retard.with sealed seams for non-wood struc. 7260
yes 1313.3 Wall vapor retarder Indicate vapor retarder on wall section A6 02
A6 03
GO 03
07260
yes 1313.4 Floor vapor retarder Indicate vapor retarder on floor section A6 02
A6 03
GO 03
07260
yes 1313.5 Crawl space vap.ret. Indicate six mil black polyethylene overlapped 12' on ground A6 02
A6.03
1314 Air leaks e
yes 13141 Bldg.envel.sealing Indicate sealing,caulking,gasketing,and weatherstripping A6 02
A6 03
GO 03
07260
• 2004 Washington State Nonresidential Energy Code Compliance Form
• yes 1314.2 Glazing/door sealing Indicate weatherstripping A6 02
A6 03
GO 03
07260
yes 1314.3 Assemb.as ducts Indicate sealing,caulking and gasketing A6 02
A6 03
GO 03
07260
PRESCRIPTIVE/COMPONENT PERFORMANCE (Sections 1320-23 or 1330-34)
yes Envelope Sum.Form Completed and attached. Attached
Provide component performance worksheet if necessary
If 'no' is shown for any question,provide explanation:
\\ 115.
21:7
p
Gq
:4
C9 �
/ Q
/ -47 /
�O O``
A
0
\ fl
118; 10(/10
\ D
St //
/
124
1-30
1.36_
60 7hrs m is not intended to be rsed as a legal description.
Vertical Datum=NA VD 88 N map ga p
Horizontal Datum=NAD 83191 Area Map 77rrs map.d the r use
produced by the City ojPort Angeles for its own rse and itv. ses. r
Feet Arry other rrse ofthrs maa�drawinY steal!not be the respmrsibiliry of the Cirv. �r'
Parcel Lookup Page 1 of 1
Parcel Number 0630005000000000
'Site Address. 133 E FRONT ST PA
Taxpayer•
VOANG KHOAN 633 E 1ST ST
PORT ANGELES WA 98362-3303
Title Owner•
VOANG KHOAN 633 E IST ST
PORT ANGELES WA 98362-3303
Description-
TIDELANDS EAST
TX#309 EX PT& EX S10' LT1 131-1
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
'Senior/Disabled or Current Use programs(except Commercial Forestland properties).
Land Value: 38,860
Improvements Value: 0
Total Assessed Value. 38,860
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property.
Use Code: 5820 TAVERN/LOUNG
Land Size (acreage). 00
Note:Acreage is not listed for all properties in the
Assessor's records.More information about land size.
Tax Status: Taxable
Tax Code Area: 0010
Zoning Code- P_CBD
Note:Zoning and zoning codes change constantly.Verify all
zoning with the appropriate planning or building department.
Building Characteristics. (Click on Bldg.#for more details.)
# Bldg.Type Bldg. Style Total S.F. BD BA
Tax History Sales History
§i
930,622
0�
http.//apps.ciallam.net/website/sitis_p pgm?parcel=0630005000000000 8/1/2006
Parcel Lookup Page 1 of 1
Parcel Number 0630000701160000
Site Address:
Taxpayer-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES WA 98362-0217
Title Owner-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES, WA 98362-0217
Description.
TIDELNDS W 40' LT 2 BL 1
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or Current Use programs(except Commercial Forestland properties).
Land Value: 0
Improvements Value. 0
Total Assessed Value. 0
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property
Use Code: 9350 SALTWATER TL
Land Size(acreage). 00
Note:Acreage Is not listed for all properties in the
Assessor's records.More information about land size.
Tax Status: City
Tax Cade Area: 0010
Zoning Code-
Note:Zoning and zoning codes change constantly Verify all
zoning with the appropriate planning or building department.
Building Characteristics. (Click on Bldg.#for more details.)
Bldg.Type Bldg. Style Total S.F. BD BA
Tax History Sales History
3
930 673
http.Hai)ps.clailam.net/website/sit;is—p pgm?parcel=0630000701160000 8/1/2006
Parcel Lookup Page 1 of 1
Parcel Number 0630005090200000
Site Address: 127 E FRONT ST PA
Taxpayer-
ELLIOTT RICHARD E 651 SOUTHFIELD
SHREVEPORT LA 71106
Title Owner-
ELLIOTT RICHARD E 651 SOUTHFIELD
SHREVEPORT LA 71106
Description
TIDELANDS WEST
SP#86-1-1 V16 P30 LOT 2
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or Current Use programs(except Commercial Forestland properties).
Land Value: 31,875
Improvements Value: 0
Total Assessed Value: 31 875
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property.
Use Code: 9120 COMMERCIAL
Land Size(acreage). 00
Note:Acreage is not listed for all properties in the
Assessor's records.More.Inforrnation about land size.
Tax Status: Taxable
Tax Code Area: 0010
Zoning Code. P_CBD
Note:Zoning and zoning codes change constantly Verify all
zoning with the appropriate planning or building department.
Building Characteristics. (Click on Bldg.#for more details.)
# Bldg.Type Bidg Stile Total S.F. BD BA
Tax History Sales History
C3uit; .:Back:;
930,618
t 1
l,ttn flnnnc rinllam net/website/sitls n nQm?parcel=0630005090200000 8/]/2006
Parcel Lookup Page 1 of 1
Parcel Number 0630000701240000
Site Address:
Quit Back
Taxpayer-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES WA 98362-0217
Title Owner-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES WA 98362-0217
Description
TIDELNDS W2 LT 3 & LT 4 BL 1
Value Summary
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or Current Use programs(except Commercial Forestland properties).
Land Value: 0
Improvements Value: 0
Total Assessed Value- 0
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property
Use Code: 9350 SALTWATER TL
Land Size(acreage). 00
Note:Acreage is not listed for all properties in the
Assessor's records.More information about land size.
Tax Status. City
Tax Code Area: 0010
Zoning Code.
Note:Zoning and zoning codes change constantly.Verify all
zoning with the appropriate planning or building department.
Building Characteristics. (Click on Bldg.#for more details.)
-AL Bldg.Type Bldg Style Total S.F. BD BA
Tax History Sales History
�uit: Back
930,716
http.//apps.ciallam.net/website/sitis_p pgm?parcel=0630000701240000 8/l/2006
Parcel Lookup Page 1 of 1
Parcel Number 0630005000460000
Site Address:
Quit= 13ack�
Taxpayer-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES WA 98362-0217
Title Owner-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES WA 983624217
Description
TIDELANDS EAST
S80'W2 LT4 EXC S10'& E2 LT4 BL1
SUR V40 P40
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or Current Use programs(except Commercial Forestland properties).
Land Value. 0
Improvements Value: 0
Total Assessed Value. 0
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property
Use Code: 9350 SALTWATER TL
Land Size(acreage). 00
Note:Acreage is not listed for all properties in the
Assessors records.More information about land size.
Tax Status:
Tax Code Area: 0010
Zoning Code. P_CBD
Note:Zoning and zoning codes change constantly Verify all
zoning with the appropriate planning or building department.
Building Characteristics (Click on Bldg.#for more details.)
# Bldg..Type Bldg_Sttle Total..S.F. _BD. BA
Tax History Sales History
,Quit; :,:back
930,714
V�
http.//apps.clallam.net/website/sitis_p pgm?parcel=0630005000460000 8/1/2006
Parcel Lookup Page 1 of 1
Parcel Number 0630005000430000
Site Address: 9999 RAILROAD AVE PA
Taxpayer•
HECKMAN JAMES C C/O JAMES&ASSOC INC
1115 E FRONT ST STE B
PORT ANGELES WA 98362
Title Owner•
HECKMAN JAMES C C/O JAMES&ASSOC INC
1115 E FRONT ST STE B
PORT ANGELES WA 98362
Description.
TIDELANDS EAST
N210 OF VV2 LT4 BL 1
SUR V40 P40
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or current Use programs(except Commercial Forestland properties).
Land Value: 44 855
Improvements Value: 10 665
Total Assessed Value. 55,520
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property
Use Code: 5900 OTHER RETAIL
Land Size(acreage). 00
Note:Acreage is not listed for all properties in the
Assessor's records.More information about land size.
Tax Status: Taxable
Tax Code Area: 0010
Zoning Code. P_CBD
Note:Zoning and zoning codes change constantly Verify all
zoning with the appropriate planning or building department.
Building Characteristics (Click on Bldg.#for more details.)
# Bldg.Type Bida.Style Total S.F. BD BA
House
Tax History Sales History
C2uit: .Sack
930 562
lo
httn_//anns.clallam.net/website/sitis p pem?PARCEL=0630005000430000 8/1/2006
Parcel Lookup Page 1of 1
.Parcel Number 0630005000500000
Site Address: 119 E FRONT ST PA
4 _
Taxpayer-
HECKMAN JAMES C C/O JAMES &ASSOC INC
1115 E FRONT ST STE B
PORT ANGELES, WA 98362
Title Owner-
HECKMAN JAMES C C/O JAMES &ASSOC INC
1115 E FRONT ST STE B
PORT ANGELES,WA 98362
Description
TIDELANDS EAST
E2 LT5 EXC N175' &S 10' BL 1
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or current Use programs(except commercial Forestland properties).
Land Value: 24,635
Improvements Value: 0
t
Total Assessed Value: 24,635
Property Characteristics.
Note:Use Code is for Assessor's purposes only.Contact the appropriate planning or
building departments for Zoning and allowable usage of properly.
Use Code: 4600 AUTO PARK
Land Size(acreage). 00
Note:Acreage is not listed for all properties in the
Assessor's records.More Information about land size.
Tax Status: Taxable
Tax Code Area: 0010
Zoning Code: P_CBD
Note:Zoning and zoning codes change constantly.Verify all
zoning with the appropriate planning or building department.
Building Characteristics: (Click on Bldg.#for more details.)
Total S.E. BD BA
House
Tax History Sales History
930 607
tA
bttp.Happs.clallam.net/website/sitis_p pgm?parcel=0630005000500000 9/l/2006
Parcel Lookup Page 1 of 1
Parcel Number 0630005000600000
Site Address:
Taxpayer-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES,WA 98362-0217
Title Owner*
CITY OF.PORT ANGELES PO BOX 1150
PORT ANGELES WA 98362-0217
Description.
TIDELANDS EAST
N175' LT5BL1 EXCS10'
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or Current Use programs(except commercial Forestland properties).
Land Value: 0
Improvements Value. 0
Total Assessed Value. 0
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property
Use Code: 9750 EXEMPT
Land Size(acreage). 00
Note:Acreage is not listed for all properties in the
Assessor's records.More information about land size.
Tax Status: City
Tax Code Area: 0010
Zoning-Code: P_CBD
Note:Zoning and zoning codes change constantly verify all
zoning with the appropriate planning or building department
Building Characteristics (Click on Bldg.#for more details.)
# Blaa�pe _ BId�_S�t fle Total S.F. 5D. BA
Tax History Sales History
930 558
� i
�h
le w" L
httn //nnnc rlallam net/website/sites n nam?PARCEL=0630005000600000 8/1/2006
Parcel Lookup Page 1 of 1
Parcel Number 0630000701480000
Site Address:
Taxpayer*
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES WA 98362-021.7
Title Owner-
CITY OF PORT ANGELES PO BOX 1150
PORT ANGELES,WA 98362-0217
Description.
TIDELNDS S 10'OF E2 &ALL W2
LOT 5 & E2 LOT 6 BL 1
Value Summary-
Note:Listed values do not reflect adjustments made for exemption programs such as
Senior/Disabled or Current Use programs(except Commercial Forestland properties).
Land Value: 0
Improvements Value: 0
Total Assessed Value. 0
Property Characteristics
Note:Use Code is for Assessor's purposes only Contact the appropriate planning or
building departments for Zoning and allowable usage of property.
Use Code: 9350 SALTWATER TL
Land Size (acreage). 00
Note:Acreage is not listed for all properties in the
Assessor's records.More information about land size.
Tax Status: City
Tax Code Area: 0010
Zoning Code.
Note:Zoning and zoning codes change constantly.Verify all
zoning with the appropriate planning or building department.
Building Characteristics. (Click on Bldg.#for more details.)
# Bldg.Type Bldg Style Total% BD BA
Tax History Sales History
°Quit°° -Back:
7411
v�
h �
8/]/2006
�lallam nPtAx7PhC1tP/C1t1Q n nom7nsrreI=0h�0000701480000
Application Number . . . . . 22-00001551 Date 12/13/22
Application pin number . . . 889412
Property Address . . . . . . 123 E FRONT ST
ASSESSOR PARCEL NUMBER: 06-30-00-5-0-0043-0000-
Application type description ELECTRICAL ONLY
Subdivision Name . . . . . .
Property Use . . . . . . . .
Property Zoning . . . . . . . CENTRAL BUSINESS DISTRICT
Application valuation . . . . 0
----------------------------------------------------------------------------
Application desc
Restroom circuit
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
CLALLAM TRANSIT SYSTEM OLYMPIC ELECTRIC CO INC
830 LAURIDSEN BLVD 4230 TUMWATER
PORT ANGELES WA 98363 PORT ANGELES WA 98363
(360) 457-5303
----------------------------------------------------------------------------
Permit . . . . . . ELECTRICAL ALTER COMMERCIAL
Additional desc . .
Permit Fee . . . . 74.00 Plan Check Fee . . .00
Issue Date . . . . 12/13/22 Valuation . . . . 0
Expiration Date . . 6/11/23
Qty Unit Charge Per Extension
1.00 74.0000 ECH EL-COMM BRANCH CIR WO/ S/F 74.00
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 74.00 74.00 .00 .00
Plan Check Total .00 .00 .00 .00
Grand Total 74.00 74.00 .00 .00
Public Works and Utilities Department
321 E. 5th Street, Port Angeles, WA 98362
360.417.4735 | www.cityofpa.us | electricalpermits@cityofpa.us
ELCOM MULTI-FAMILY / COMMERCIAL
ELECTRICAL PERMIT APPLICATION
Project Address:
Project Description: □Multi-Family Residential □ Commercial / Industrial / Public Building Square footage:
OWNER INFORMATION
Name: Email:
Mailing Address: Phone:
ELECTRICAL CONTRACTOR INFORMATION
Name: License:
Mailing Address: Expiration Date:
Email: Phone:
PROJECT DETAILS
Item Unit Charge Quantity Total (Quantity x Unit Charge)
Service/Feeder 200 Amp.$132.00 $
Service/Feeder 201-400 Amp.$160.00 $
Service/Feeder 401-600 Amp.$225.00 $
Service/Feeder 601-1000 Amp.$288.00 $
Service/Feeder over 1000 Amp.$410.00 $
Branch Circuit W/ Service Feeder $5.00 $
Branch Circuit W/O Service Feeder $74.00 $
Each Additional Branch Circuit $5.00 $
Branch Circuits 1-4 $86.00 $
Temp. Service/Feeder 200 Amp.$102.00 $
Temp. Service/Feeder 201-400 Amp.$121.00 $
Temp. Service/Feeder 401-600 Amp.$164.00 $
Temp. Service/Feeder 601-1000 Amp.$185.00 $
Portal to Portal Hourly $96.00 $
Sign / Outline Lighting $88.00 $
Signal Circuit/Limited Energy - Multi-Family $88.00 $
Signal Circuit/Limited Energy/First 1500 sf - Commercial
(Note: $5.00 for each additional 1500 sf)
$96.00 $
Renewable Elec. Energy: 5KVA System or less $113.00 $
Thermostat (Note: $5 for each additional)$56.00 $
$ TOTAL
Owner as defined by RCW.19.28.261: (1) Owner will occupy the structure for two years after this electrical permit is finalized. (2) Owner is
required to hire an electrical contractor if above said property is for sale, rent or lease. Permit expires after six months of last inspection.
After reading the above statement, I hereby certify that I am the owner of the above named property or a licensed electrical contractor. I
am making the electrical installation or alteration in compliance with the electrical laws, N.E.C., RCW. Chapter 19.28, WAC. Chapter 296-
46B, The City of Port Angeles Municipal Code, and Utility Specifications and PAMC 14.05.050 regarding Electrical Permit Applications.
Date Print Name Signature (□Owner □Electrical Contractor / Administrator)Permit #: [Electrical Permit Applications may be submitted to City Hall or epermits@cityofpa.us or faxed to 360.417.4711]
PREPARED 12/12/22,13:20:17 PAYMENT DUE
CITY OF PORT ANGELES PROGRAM BP820L
---------------------------------------------------------------------------
APPLICATION NUMBER:22-00001551 123 E FRONT ST
FEE DESCRIPTION AMOUNT DUE
---------------------------------------------------------------------------
ELECTRICAL ALTER COMMERCIAL 74.00
TOTAL DUE 74.00
Please present reciept to the cashier with full payment
ELECTRICAL INSPECTION WIRING REPORT
APPROVED NOT APPROVED
DITCH
ROUGH IN/COVER
SERVICE
FINAL
COMMENTS:
Bathroom
NOTIFY INSPECTOR at (360) 808-2613
WHEN CORRECTIONS ARE COMPLETED
WITHIN 15 DAYS
DATE PERMIT # INSPECTOR
12/13/2022 22-1551 TAP
OWNER
CONTRACTOR
Olympic Electric
PROJECT ADDRESS
123 E Front St