Loading...
HomeMy WebLinkAbout09232026 PC Regular Meeting Agenda PacketREGULAR MEETING AGENDA PLANNING COMMISSION September 23, 2026 6:00 - 8:00 PM Notice is hereby given that the Port Angeles Planning Commission will meet on Wednesday, September 23, 2026 located at 321 E. 5th Street, Port Angeles, WA. This meeting will be conducted as a hybrid meeting. In hybrid meetings, members of the public, Committee members, and City staff have the option to attend the meeting in person at City Hall or remotely through the Webex virtual meeting platform. For those planning to attend remotely, learn how to watch the meeting live and participate during the public comment period by visiting: https://www.cityofpa.us/Live-Virtual-Meetings For audio only, please call: 1-844-992-4726 Use access code: 2555 199 9993 Webinar password: PC09232026 (72092320 when dialing from a phone or video system) Once connected, press *3 to raise your virtual hand if you wish to make a comment or public testimony. You will be notified when it is your turn to speak. This access code will work for the September 23, 2026 meeting only. If you are joining the meeting through the Webex link and wish to make a comment or provide public testimony, please use the “raise your hand” feature in Webex. You will be notified when it is your turn to speak. Virtual Webex Meeting Link: https://cityofpa.webex.com/cityofpa/j.php?MTID=m96bca9959594c7efb2c28ab0dff53b83 The meeting is open to the public. I.CALL TO ORDER II.ROLL CALL III.PUBLIC COMMENT IV. APPROVAL OF MINUTES Minutes of the August 26, 2026 Meeting V. ACTION/DISCUSSION ITEMS 1.Action: Public Hearing for MCA 26-0090 Critical Areas Ordinance Update. A municipal code amendment to Title 15 to update the Critical Areas Ordinance to comply with state law and the best available science. STAFF UPDATES 1. Monthly Customer Service Report 2. Monthly Type 0/OTC Report 3. Monthly 5290 Report 4. Monthly Affordable Housing Report 5. Monthly Natural Resources Verbal Report 6. Monthly Land Use and Permitting Verbal Report 7. Monthly Building Report VI. REPORTS OF COMMISSION MEMBERS VII. PUBLIC COMMENT VIII. ADJOURNMENT PLANNING COMMISSION MEETING Port Angeles, Washington August 26, 2026 This meeting was conducted as a hybrid meeting. CALL TO ORDER - REGULAR MEETING Chair Young called the regular meeting of the Port Angeles Planning Commission to order at 6:05 p.m. ROLL CALL Planning Commission Chair Steiger, Vice Chair Kiedrowski, Commissioners: Omega, Vogel. Members Absent: Commissioner Schorr, Mellema, Vanderlugt. Staff Present: Planning Supervisor Ben Braudrick; Natural Resources and Grant Administrator Courtney Bornsworth; Senior Development Services Specialist Pat Bartholick; Building Inspector/Licensing Administrator Chris Jackson. COMMISSIONER INTRODUCTIONS Planning Commissioners introduced themselves to newly appointed Commissioner Omega. PUBLIC COMMENT John R., Resident Supports Façade Grant 26-0002. ADA improvements made for all future grants. AGENDA ITEMS Action Item: Action: Façade Grant 26-0002 Studio Bob. Planning Commission review of façade grant proposal for façade updates (paint and highlight historic Art Deco architectural features restoration) at Studio Bob and Sound Bikes and Kayaks, 118 E Front St, Port Angeles, WA 98362. It was moved by Kiedrowski and seconded by Vogel to: Approve funding for Façade Improvement Grant 26-0002, citing 7 findings, 2 conclusions, and 8 conditions in the staff report. Motion carried 4-0. Action Item: MCA 26-0090 Wetlands Buffer Options Analysis. Staff presentation on wetland buffering regulations. Planning Commission action to recommend the preferred alternative for the wetland buffers. It was moved by Omega and seconded by Vogel to: Select Option 3 as the preferred Wetland Buffer methodology It was moved by Steiger and seconded by Vogel to Amend the motion to also include exceptions listed in WAC 365-195-915 Motion carried 3-1, with Kiedrowski dissenting. Amended Motion: Select Option 3 as the preferred Wetland Buffer methodology and include the exceptions listed in WAC 365-195-915. Motion carried 3-1, with Kiedrowski dissenting. Discussion: MCA 26-0090 Critical Areas Ordinance Update. Staff presented, and the Planning Commission discussed Phase 2 of the development code updates to Titles 11, 13, and 15 of the municipal code, including the proposed amended code. September 23, 2026 Planning Commission Regular Meeting 1 CITY OF PORT ANGELES PLANNING COMMISSION – August 26, 2026 Page 2 of 3 Changes for Title 15 suggested by the Planning Commission: Section 15.02.010: Add a definition for scientific experts and remove the definition for qualified professionals. Section 15.22.230.B.: Missing Sections 3 and 7. Section 15.22.230.B.4: Strike the words “do not” and add the word “minimize”. Section 15.22.280: Request review of the aquifer recharge map before finalization. Section 15.22.290.A.1: Change “and” to “or”. Section 15.22.310: Concern over the level of analysis for expansion of existing use. Section 15.22.360: Missing point “d”. Section 15.22.410.D: Clarification of tree replacement as an enforcement issue. Section 15.22.450.A.8: How will staff define locally important habitat areas? Section 15.22.480.E: Change “EMZ” to “RMZ”. STAFF UPDATES Customer Service Report None given. Monthly Type 0/Over the Counter Report None given. Monthly 5290 Report Licensing Administrator and Building Inspector Jackson gave a brief report on the 5290 permitting timelines for July 2026. Monthly Affordable Housing Report None given. Monthly Natural Resources Report The City is reviewing two SEPA checklist applications for the Port Angeles School District. Monthly Land Use Permitting and Economic Development Report None given. Monthly Building Report Senior Development Services Specialist Bartholick gave the July 2026 building report, which showed 56 building permits were issued. Quarterly Business Licensing Report None given COMMISSION REPORTS No reports given due to time constraints. September 23, 2026 Planning Commission Regular Meeting 2 CITY OF PORT ANGELES PLANNING COMMISSION – August 26, 2026 Page 3 of 3 COMMISSION REPORTS None given. SECOND PUBLIC COMMENT John R., Resident Did the City get any feedback on the proposed CAO update from qualified professionals? Concerned about the accuracy of the various critical area maps from federal, state, and local agencies. Provided an editorial from the Seattle Times about construction costs. ADJOURNMENT Chair Steiger adjourned the meeting at 7:45 p.m. _____________________________________ _______________________________ Chair Steiger, Chair Ben Braudrick, Secretary September 23, 2026 Planning Commission Regular Meeting 3 EXHIBIT 1: STAFF REPORT TO: Planning Commission FROM: Planning Division DATE: Wednesday, September 23, 2026 RE: Municipal Code Amendment Application 26-0090 I. BACKGROUND The City is undertaking a multi-phased municipal code update to improve clarity, organization, and alignment with the Vision 2045 Comprehensive Plan. This effort builds on prior City Council direction and the adopted Municipal Code Amendment work plan. Phase 2 of this work plan was introduced to the Planning Commission on May 27, 2026, as a periodic update to the City’s Critical Areas Ordinance (CAO). The proposed municipal code updates are required under the Growth Management Act (GMA) and must be completed by December 31, 2026. This report details a comprehensive review of the planning and engagement processes for the critical areas ordinance public hearing. The proposed amendments have been drafted to improve clarity, readability, and consistency with best available science guided by state and federal agencies. The amendments have reorganized the existing CAO into a more streamlined development regulation that will be easier for both internal and external users of the code to navigate. Definitions have been updated and consolidated, and each of the five regulated critical areas have specific development regulations established. The amendments serve to balance reasonable protection standards for critical areas, as well as the protection of people, infrastructure and buildings from the hazards associated with development in or adjacent to critical areas. Throughout the CAO code writing processThe CAO staff have presented and requested feedback from the Planning Commission and City Council. This includes an internal code audit work, targeted outreach with stakeholders, and a formal public process. The following timeline summarizes the major milestones supporting the development of the proposed amendments. • January 28, 2026. The Planning Commission adopts the staff-recommended 2026-2028 Planning Commission Workplan, which includes MCA 26-0090 as Phase 2 of the planned four-phase development code update. • May 27, 2026. Staff introduced Phase 2 to the periodic update to the City’s Critical Areas Ordinance. • April through August 2026. Staff conducted an internal kickoff, scope definition, code September 23, 2026 Planning Commission Regular Meeting 4 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 2 of 10 audit, drafting, interdepartmental review and refinement, and external stakeholder engagement of the Phase 2 amendment package. • June through August, 2026. Staff brought proposed amendments to the Planning Commission for review, and public comment. • August 25, 2026. City Council work session. • Septmeber 23, 2026. Planning Commission public hearing of the amendments. • November 17, 2026. City Council Adoption of the Critical Areas Ordinance. Upon Council adoption, implementation identified in the Phase 2 work program includes updates to frequently asked questions, website content, mapping and GIS updates, and the development of handbooks for homewoners, relators, and any other interested party. II. CODIFICATION GOALS AND OBJECTIVES The Planning Commission has been asked to consider the Phase 2 amendment package as a comprehensive update to Title 15 of the Port Angeles Municipal Code. Staff have approached this proposal through the following goals and objectives: Goal 1: Complete a critical areas ordinance update that complies with GMA periodic update requirements and the inclusion of best available science. Objective 1.1: Align Title 15 with the state-mandated Critical Areas Ordinance update associated with the 2025 Growth Management Act periodic update. Objective 1.2: Ensure amended critical areas regulations reflect best available science current best practices, and net gain of critical areas where feasible. Objective 1.3: Maintain consistency between local code, adopted plans, and applicable state requirements governing environmental review, critical areas protection, and related procedures. Objective 1.4: Deliver an adopted ordinance prior to the December 31, 2026 deadline set by the Growth Management Act. Goal 2: Redevelop Title 15 to provide administrative clarity for both the community and members of the city team. Objective 2.1: Consolidate critical areas regulations into a more clearly organized chapter structure so standards are easier to locate, interpret, and administer. Objective 2.2: Update environmental definitions and related terminology to support consistent interpretation across affected chapters. Objective 2.3: Improve readability of environmental review requirements for staff, applicants, property owners, contractors, and qualified professionals. September 23, 2026 Planning Commission Regular Meeting 5 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 3 of 10 Objective 2.4: Clarify how critical area regulations mitigate the impacts associated with development activities, including clearing, grading, utilities, and related site work across affected code titles. Goal 3: Amend Title 15 to contain established methods, rules, and sequences of action to ensure procedural consistency. Objective 3.1: Align review thresholds, submittal expectations, and procedural references with PAMC 18.02 and related permit processing requirements. Objective 3.2: Remove outdated, duplicative, or conflicting provisions that create uncertainty during environmental review and code administration. Objective 3.3: Improve coordination across Community and Economic Development, Public Works, Parks and Recreation, Legal, and Communications functions during code administration and rollout. Goal 4: Improve public usability and long-term implementation through handbooks, BMPs, and FAQs. Objective 4.1: Support clearer public-facing implementation through improved code structure, website content, frequently asked questions, and handbook development. Objective 4.2: Use stakeholder and Planning Commission review to vet the amended code for readability, consistency, and practical administration. Objective 4.3: Prepare the amended code for long-term implementation through staff training, public education, and maintenance of a more usable environmental code structure. III. OUTREACH AND ENGAGEMENT Targeted outreach completed or underway includes: • Planning Commission 2026-2028 Workplan Adoption – January 28, 2026 • Dedicated website to MCA 26-0090 – May 2026 • Builder’s Roundtable MCA 26-0090 Introduction – May 15, 2026 • Planning Commission MCA 26-0090 Introduction – May 27, 2026 • Stakeholder Advisory Committee Meetings – June – August 2026 • Planning Commission Amendment Review – June – August 2026 • KONP Todd Ortloff Radio Appearance and Discussion – August 5, 2026 • City Council Work Session – August 25, 2026 • Planning Commission Public Hearing – September 23, 2026 September 23, 2026 Planning Commission Regular Meeting 6 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 4 of 10 IV. PROCEDURE MCA 26-0090 is a citywide non-project actions that require public notice, a public hearing, and a final legislative decision by the City Council. These actions were accomplished on the following dates: • August 19, 2026. Public notice for MCA 26-0090 was published in the Peninsula Daily News and on the City’s Website. • September 3, 2026. 60-day notice to the Department of Commerce. • September 23, 2026. Written comment period close. • September 23, 2026. Planning Commission public hearing. • October 20, 2026. City Council first reading of ordinance. • November 17, 2026. City Council second reading of ordinance and adoption. V. COMMENTS Public Comment: See Exhibit 3, Public Comment Memo. The public comment memo and matrix also contain all comments and questions received from Planning Commission, Stakeholders, City Council, and other government agencies to-date. Exhibit 4 also contains questions and responses from the June 2026 Planning Commission Meeting. City of Port Angeles Departmental Comments: Comments received from the City of Port Angeles Departments have been incorporated into the proposed code amendments. VI. PROPOSED MUNICIPAL CODE UPDATES Title 15 – Environment The proposed amendments strike Chapter 15.20 – Environmentally Sensitive Areas Protection entirely and incorporate them into a new chapter titled 15.22 – Critical Areas. Chapter 15.02 – Definitions now consolidates applicable definitions and includes additional definitions for clarity and reference. Chapter 15.24 – Wetlands Protection have been struck entirely and are proposed to be incorporated under Article III – Wetlands of Chapter 15.22. VII. FINDINGS OF FACT AND STAFF ANALYSIS Comprehensive Plan All municipal code amendments must be consistent with the Port Angeles Comprehensive Plan. The following adopted goals and policies are the strongest direct policy support for the CAO amendment package. Land Use Element: September 23, 2026 Planning Commission Regular Meeting 7 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 5 of 10 Goal LU-1: Land Use Pattern. Establish and manage a pattern of development consistent with the community’s vision and provide for a variety of land uses that further the policies of this Plan. Guide land development to balance certainty with flexibility to adapt to future challenges and opportunities. Policy LU-1.8: Avoid split zoning in creek riparian zones and bluffs, and use the critical areas ordinance to protect environmentally sensitive features. However, designate creek riparian zones and bluffs as “open space” on the Future Land Use Map to signal their significance to the ecology and community of Port Angeles and explore ways to connect these open spaces to create habitat corridors. Goal LU-7: Growth Management and Regional Cooperation. Regulate development, manage growth, and annex land in a responsible manner that is beneficial to the community as a whole and is consistent with the Washington State Growth Management Act. Policy LU-7.5: Assure that development review and permit processes operate in a fair, timely, and predictable manner and update processes from time to time to incorporate best practices, changes in law, and align with community priorities and values. Conservation Element: Goal C-2: Protect and enhance the area's unique physical features, its natural, historical, archaeological, and cultural amenities, and the overall environment. Policy C-2.3: Recognize the essential role of critical areas and the shoreline in community health and ecological resilience. Strive for net ecological gain, in State-designated Critical Areas, of functions and values when feasible, with close guidance from WDFW’s best available science. Policy C-2.7: Reference the most recently adopted Washington State Citations of Recommended Sources of Best Available Science for Designating and Protecting Critical Areas and other research identified as more locally appropriate and applicable when available as Best Available Science in the Critical Areas Ordinance. Hazard Mitigation & Climate Resiliency Element: Goal HM-4: Ensure the protection and restoration of streams, riparian zones, estuaries, wetlands, and floodplains to achieve healthy floodplains that are more resilient to climate change. Policy HM-4.1: Protect and restore watershed-scale processes to maximize the ecological benefits and climate resilience of riparian ecosystems, utilizing best available science. Utilities & Public Services Element: September 23, 2026 Planning Commission Regular Meeting 8 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 6 of 10 Goal U-3: Prepare conservation strategies and protect water quality to increase resilience to drought, sea level rise, and reduced snowpack. Policy U-3.3: Maintain and enhance the quality of water resources through the regulation of clearing, grading, dumping, discharging, and draining, and the provision of flood and erosion control measures and regulations to protect wetlands and other environmentally sensitive areas. Use adaptive management practices and best available climate science and projections to inform these efforts. Staff Analysis: Collectively, these goals and policies provide direction for the critical area protection, environmental resilience, water quality, and development review provisions proposed through MCA 26-0090. The proposal supports Goal LU-1 and the critical area protection component of Policy LU-1.8 through standards for identifying and protecting critical areas and their buffers. Consolidated definitions and coordinated review requirements support Goal LU-7 and Policy LU-7.5 by clarifying how these standards are applied. Goal C-2 and Policies C-2.3 and C-2.7 are supported through the use of best available science in critical area review and mitigation. The proposed regulations require mitigation sequencing to achieve no net loss of functions and values and encourage net ecological gain where feasible. Goal HM-4 and Policy HM-4.1 are supported through wetland, floodplain, and riparian provisions that protect ecological functions, maintain floodwater storage, and address development impacts through mitigation and restoration. The proposal also supports Goal U-3 and Policy U-3.3 through critical aquifer recharge area protections and requirements for best management practices and review of clearing, grading, drainage, and other regulated activities affecting critical areas and water quality. Housing Action Plan The 2025 Housing Action Plan identifies local barriers to housing production and reuse, including aging housing stock, infrastructure constraints, limited workforce capacity, and regulatory barriers that can increase costs and uncertainty for applicants and property owners. September 23, 2026 Planning Commission Regular Meeting 9 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 7 of 10 Staff Analysis: The Housing Action Plan is not the primary policy basis for MCA 26-0090. However, Task 2 in the Housing Action Plan addresses improvements to the City of Port Angeles’ weatherization and repair programs. Weatherization and energy rebates are valuable investments that can significantly enhance your home's comfort and efficiency. By properly sealing gaps, adding insulation, and making necessary upgrades, you can create a more consistent indoor temperature year-round. This not only reduces the strain on your heating and cooling systems, ultimately lowering your energy bills, but also contributes to a healthier living environment by minimizing drafts and reducing moisture buildup. In addition, the Housing Needs Assessment provides a land capacity analysis that looks at Port Angeles’ housing targets and the capacity of income bands. The land capacity analysis identifies critical areas, EPA Superfund sites, the 50% critical area reduction factor, partially used parcels, and re-developable parcels. Climate Resiliency Plan The primary policy basis for this CAO amendment package is the Comprehensive Plan, City Work Plan and the draft amendment text itself. The Climate Resiliency Plan and Implementation Plan contain several strategies and actions that address community resilience and wellbeing, ecosystem health, transportation, buildings and energy, and consumption & waste that can be achieved through critical areas regulation. Specific actions and activities from the Climate Resiliency Plan that are relevant to the CAO are identified below. Community Resilience and Wellbeing • Water supply monitoring & enhancement • Sea level rise vulnerability assessment of City assets • Comprehensive Plan priorities Ecosystem Health • Forest and marine habitat preservation • Urban tree canopy, parks, and open space • Native plant landscaping • Critical area protection • Coastal erosion reduction • Salmon habitat protection • Land-based pollutant reduction September 23, 2026 Planning Commission Regular Meeting 10 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 8 of 10 Staff Analysis: The 2022 Climate Resiliency Plan includes a focus on community resilience and wellbeing and ecosystem health. MCA 26-0090 is consistent with that direction by implementing management strategies focused on protecting and enhancing critical areas, including but not limited to fish and wildlife habitat conservation areas. Protection standards for critical areas serve to preserve the ecosystem functions and values of wetlands, geologically hazardous areas, groundwater, and fish and wildlife habitat while also protecting our community from the potential hazards associated with building in or adjacent to critical areas. Many of our critical areas also serve as open space throughout the community, contributing to the community’s wellbeing while also contributing to the overall climate resiliency of the landscape. Port Angeles Municipal Code The following PAMC provisions are seen as relevant to this application. Planning Staff provides comments under each provision as a demonstration of the analysis conducted during the application review process and the findings of fact relevant to the application. Title 18 Per PAMC Section 18.02.050, the City Council has the authority to review and is authorized and directed to hear and decide on Type V permit applications. Staff Analysis: A Municipal Code Amendment requires a public hearing before the Planning Commission. The recommendation to the City Council is based on the draft plan, comprehensive public comments, the Port Angeles Municipal Code, and information available during the public engagement process. Such a decision may be appealed to the Superior Court, provided that the appeal is filed within 21 days of the City Council's decision, as per Chapter 36.70C RCW. If an appeal is not filed within the applicable period, the City Council's decision is final. A timely appeal of any City Council decision will stay all further proceedings by the Department of Community and Economic Development, specifically related to the periodic update under appeal. Environmental Review Amendments to the Critical Areas Ordinance are exempt from the requirements of the State Environmental Policy Act under RCW 43.21C.450(1) and RCW 43.21C.450(3). Consistency In preparation and submission of a Municipal Code Amendment, City Staff have demonstrated that all standards will be met in accordance with the City’s Comprehensive Plan and the Port Angeles Municipal Code. September 23, 2026 Planning Commission Regular Meeting 11 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 9 of 10 VIII. CONCLUSIONS Having reviewed and considered the draft amendment package, public comment, and all other materials presented in the legislative record, City staff recommends that the Planning Commission forward a recommendation of approval to City Council for MCA 26-0090 based on the following conclusions: 1. Analysis and findings of fact from staff are based on the draft code language, municipal code, adopted plans, public comment, and other materials available during the review period. Collectively, the information contained in this staff report and its Attachments forms the record of review for this legislative amendment package. 2. MCA 26-0090 is citywide legislative actions affecting Title 15 of the Port Angeles Municipal Code. 3. The proposed amendments are organizational, procedural and adhere to the best available science as guided by state and federal agencies in accordance with the requirements established in Washington Administrative Code and the Revised Code of Washington. 4. The proposal improves administrative clarity by consolidating definitions and providing clear regulation for each of the five regulated critical areas; wetlands, critical aquifer recharge areas, frequently flooded areas, geologically hazardous areas, and fish and wildlife conservation areas. 5. The proposal is consistent with the adopted Comprehensive Plan policies addressing protection of critical areas, open space, and land use planning. 6. The amendment package is legislative and citywide and does not authorize site-specific disturbance or development independent of future permit review under applicable City regulations. IX. RECOMMENDATION The Planning Division recommends that the Planning Commission recommend approval of Municipal Code Amendment No. 26-0090 to the City Council. This recommendation is based on staff review of the draft code language, Port Angeles Municipal Code, adopted plans, and submitted public comments. X. EXHIBIT LIST Exhibit 2: Draft Code 26-0090 Exhibit 3: Public Comment Memo Exhibit 4: Planning Commission Q & A Exhibit 5: PC Phase 2 Introductory Memo Exhibit 6: Fish and Wildlife Habitat Audit and Analysis Memo September 23, 2026 Planning Commission Regular Meeting 12 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 10 of 10 Exhibit 7: Wetlands Gap Analysis Memo Exhibit 8: Wetlands Buffer Analysis and Recommendation Memo Exhibit 9: August 26, 2026 Draft Planning Commission Minutes Exhibit 10: Stakeholder Advisory Committee Agendas Exhibit 11: Critical Areas Ordinance Checklist Exhibit 12: List of Resources September 23, 2026 Planning Commission Regular Meeting 13 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Title 15 Environment WORKING REDLINE — CHANGED SECTIONS Underlined text indicates proposed additions. Struck text indicates proposed deletions. Please note the following color coordinated text for reference: Blue Text is language from existing regulation that has not been modified, Green Text is language from existing regulation that has been amended, and Black Text is new language entirely CHAPTER 15.02 DEFINITIONS 15.02.010 Definitions. These definitions must apply to Chapters 15.22 and 15.26 15.20, 15.24 and 15.28, additional definitions are located in individual chapters. “Anadromous fish” means a fish that is born in freshwater, spends much of its life in the sea, and returns to freshwater to spawn. “Aquifer recharge” is the infiltration of rainfall, snowmelt, infiltration from lakes, wetlands and streams, or irrigation water into the ground that adds to the underground water that can supply a well. “Aquifers used for potable water” are existing wells and their protection areas, sole source aquifers, and aquifers otherwise identified as important supplies. They should be identified by looking at existing and future planned uses. A. “Best available science” means That the current scientific information derived from a valid scientific process applicable to the critical area prepared by local, state or federal natural resource agencies, a qualified scientific professional or team of qualified scientific professionals, that is consistent with criteria established in WAC 365-195-900 through WAC 365-195-925 used in the process to designate, protect, and/or restore critical areas. B. “Best management practices (BMPs)” means physical or structural tools and/or management conservation practices or systems of practices and management measures that: , which, when used singularly or in combination, prevent or reduce adverse impacts to the functions and values of critical areas and their buffers, including: 1. Control soil loss and reduce water quality degradation caused by high concentrations of nutrients, animal waste, toxics, and sediment; 2. Minimize adverse impacts to surface water and groundwater flow, circulation patterns, and the chemical, physical, and biological characteristics of wetlands; 3. Protect trees and vegetation designated to be retained during and following site construction and use native plant species appropriate to the site for re-vegetation of disturbed areas; and 4. Provide standards for proper use of chemical herbicides within critical areas. C. “Buffer” means an undisturbed area adjacent to a critical area that is required to remain in an undisturbed and untouched condition to protect the functions and values of the critical area, unless otherwise exempted, allowed, or permitted by this chapter. D. “Compensatory mitigation” means the restoration (re-establishment or rehabilitation), establishment (creation), enhancement, and/or in certain circumstances preservation of wetlands for the purposes of offsetting unavoidable adverse impacts that remain after all appropriate and practicable avoidance and minimization has been achieved. September 23, 2026 Planning Commission Regular Meeting 14 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 E. “Cowardian classification” means a commonly used classification system for wetlands first developed in 1979 by the US Fish and Wildlife Service and updated in 2013. The Cowardian system classifies wetlands based on water flow, substrate types, vegetation types, and dominant plant species. It is used for wetland classification in the National Wetland Inventory. F. “Critical aquifer recharge areas” are areas with a critical recharging effect on aquifers used for potable water, including areas where an aquifer that is a source of drinking water is vulnerable to contamination that would affect the potability of the water, or is susceptible to reduced recharge. G. “Critical areas” means “wetlands”, “critical aquifer recharge areas”, “fish and wildlife habitat conservation areas”, “frequently flooded areas”, and “geologically hazardous areas”. H.C. “Critical habitat” means habitat necessary for the survival of endangered, threatened, rare, sensitive, or monitor species as identified under the Endangered Species Act. I. “Cumulative impacts” means the impact on the environment that results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (federal or non-federal) or person undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time. J. D. “Development” means any activity upon the land consisting of construction or alteration of structures, earth movement, dredging, dumping, grading, filling, driving of piles, drilling operations, bulkheading, clearing of vegetation, or other land disturbance. Development includes the storage or use of equipment or materials inconsistent with the existing use. Development also includes approvals issued by the City that binds land to specific patterns of use, including zoning changes, conditional use permits, and binding site plans. Development activity does not include the following activities: 1. Interior building improvements. 2. Exterior structure maintenance activities, including painting and roofing. 3. Routine landscape maintenance of established, ornamental landscaping, such as lawn mowing, pruning, and weeding. 4. Maintenance of the following existing facilities that does not expand the affected areas: individual utility service connections; and individual cemetery plots in established and approved cemeteries. K. “Emergency” means those activities necessary to prevent an immediate threat to public health, safety, or welfare, or that pose an immediate risk of damage to private property and that require remedial or preventative action in a timeframe too short to allow for compliance with the requirements of the critical areas regulations L.E. “Engineer” means a professional civil engineer, licensed by and in good standing in the State of Washington. M. “Enhancement” means the manipulation of the physical, chemical, or biological characteristics of a wetland to heighten, intensify, or improve specific function(s) or to change the growth stage or composition of the vegetation present. Enhancement is undertaken for specified purposes such as water quality improvement, flood water retention, or wildlife habitat. Enhancement results in a change in some wetland functions and can lead to a decline in other wetland functions but does not result in a gain in wetland acres. Activities typically consist of planting vegetation, controlling non-native or invasive species, modifying site elevations or the proportion of open water to influence hydroperiods, or some combination of these activities. N. F. “Erosion” means the wearing away of the land or ground surface by the action of wind, water, ice, gravity, or any combination thereof. O. “Erosion hazard areas” are those areas containing soils which, according to the United States Department of Agriculture Natural Resources Conservation Service Soil Survey Program, may September 23, 2026 Planning Commission Regular Meeting 15 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 experience significant erosion. Erosion hazard areas also include coastal erosion-prone areas and channel migration zones. P. “Establishment (or creation)” means the manipulation of the physical, chemical, or biological characteristics present to develop a wetland on an upland or deepwater site where a wetland did not previously exist. Establishment results in a gain in wetland acres. Activities typically involve excavation of upland soils to elevations that will produce a wetland hydroperiod, create hydric soils, and support the growth of hydrophytic plant species. Q. G. “Exotic” means any species of plant or animal that are not native to the area. R. “Fish and wildlife habitat conservation areas” are areas that serve a critical role in sustaining needed habitats and species for the functional integrity of the ecosystem, and which, if altered, may reduce the likelihood that the species will persist over the long term. These areas may include, but are not limited to, rare or vulnerable ecological systems, communities, and habitat or habitat elements including seasonal ranges, breeding habitat, winter range, and movement corridors; and areas with high relative population density or species richness. These areas do not include such artificial features or constructs as irrigation delivery systems, irrigation infrastructure, irrigation canals, or drainage ditches that lie within the boundaries of, and are maintained by, a port district or an irrigation district or company. S. “Floodplain” means the total area subject to inundation by the base flood. T. H. “Frequently flooded areas” means are lands in the floodplain subject to at least a one percent or greater chance of flooding in any given year (the 100-year storm flood), or within areas subject to flooding due to high groundwater. These areas include but are not limited to streams, rivers, lakes, coastal areas, wetlands, and the like areas where high groundwater forms ponds on the ground surface. U. “Functions and values” means the ecosystem services provided by critical areas to society, including, but not limited to, improving and maintaining water quality, providing fish and wildlife habitat, supporting terrestrial and aquatic food chains, reducing flooding and erosive flows, wave attenuation, carbon sequestration, thermal refugia, historical or archaeological importance, cultural uses and significance, educational opportunities, and recreation. V. “Geologically hazardous areas” are areas that because of their susceptibility to erosion, sliding, earthquakes, or other geological events, are not suited to siting commercial, residential, or industrial development consistent with public health or safety concerns. W. “Habitats of local importance” means fish and wildlife habitat conservation areas that are found to be of significance to the City of Port Angeles. X. “Hazard tree” means a tree that has been determined by an International Society of Arboriculture (ISA) Certified Arborist with a valid Tree Risk Assessment Qualification, to be a hazard to people, property, or infrastructure as a result of a risk assessment conducted according to ISA guiding principles. I. “Historic condition” means the condition of the land, including flora, fauna, soil, topography, and hydrology that existed before the area and vicinity were developed or altered by human activity. Y. J. “Hydraulic project approval (HPA)” means a permit issued by the state Department of Fish and Wildlife for modifications to waters of the state in accordance with Chapter 75.20 77.55 RCW. Z. “Impervious surface” means a surface area that either prevents or slows the entry of water into the soil or other substrate that would occur under natural conditions prior to development. A non-vegetated surface area that causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under pre-development or pre-developed conditions. AA.K. “Indigenous” means any species of plant or animal native to an area. Not introduced. BB.L. “Infiltration” means the downward entry of water into the immediate surface of soil. September 23, 2026 Planning Commission Regular Meeting 16 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 CC. “Invasive species” means an organism that is not native to a specific ecosystem and whose introduction causes or is likely to cause harm to the environment, economy, or human, animal, or plant health. DD.M. “Joint aquatic resource permits application (JARPA)" means a single application form that may be used to apply for hydraulic project approvals, shoreline management permits, Department of Natural Resources use authorization, and Army Corps of Engineers permits. EE.N. “Land-disturbing activity” means any use of the land activity that results in the movement of earth, or a change in the existing cover (both vegetative and non-vegetative) and/or the existing soil topography, that may cause or contribute to erosion or sedimentation. Land disturbing activities include, but are not limited to, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction will also be considered a land disturbing activity. Minor soil disturbance for site-investigation purposes or routine garden maintenance are not considered land- disturbing activities: 1. Change in the natural cover or topography that exposes soils or 2. May cause or contribute to erosion or sedimentation. This does not include nondestructive vegetation trimming. FF. “Landslide hazard areas” are areas at risk of mass movement due to a combination of geologic, topographic, and hydrologic factors. GG. “Locally unique features” means landforms and features that are important to the Character of the City of Port Angeles and the adjoining Port Angeles Urban Growth Area. These features or landforms often contain one or more critical area. Locally unique features in the Port Angeles region include ravines, marine bluffs, and beaches and associated coastal drift processes. HH.O.“Marine bluffs” means coastal features that resulted from wave erosion undercutting uplands located adjacent to the shoreline, creating vertical cliffs that are an important source of sediment for coastal drift processes and/or the landforms created by these processes. II.P. “Native” means any species of plants or animals that are indigenous to the area. JJ. “No net loss” of critical area functions and values means the maintenance of existing ecological functions and habitat conditions over time. It ensures that planned developments do not result in a decline of ecosystem functions and values by mandating strict adherence to sequential mitigation. KK.Q. “Nondestructive vegetation trimming” means the trimming, or pruning of trees, shrubs, or plants, that does not harm the continued life and health of the plant and uses best management practices for pruning as defined by the International Society of Arboriculture. LL. “Ordinary high water mark” means the mark which is found by examining the bed and banks of water bodies and ascertaining where the presence and action of waters are so common and usual, and so long continued in all ordinary years, that the soil has a character distinct from that of the abutting upland in respect to vegetation. MM.R.“Priority habitat”s means a habitat types or elements with unique or significant value to one or more species as classified by the Washington Department of Fish and Wildlife. A priority habitat may consist of a unique vegetation type or dominant plant species that is of primary importance to fish and wildlife such as eelgrass meadows, a described successional stage such as old-growth and mature forests, or a specific structural element such as a consolidated marine/estuarine shoreline or habitat snags. (WAC 173-26-020(3430). NN. “Priority species” means species requiring protective measures and/or management guidelines to ensure their persistence at genetically viable population levels, as defined by the Washington Department of Fish and Wildlife, that meet any of the criteria outlined in WAC 173-26-020(31)(a-d). September 23, 2026 Planning Commission Regular Meeting 17 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 OO.S. “Puget Sound” means all salt waters of the State of Washington inside the international boundary line between the State of Washington and the Province of British Columbia, lying east of 123 degrees, 24 minutes west longitude and includes the Strait of Juan de Fuca. PP.T. “Qualified professional” means a person with relevant training, professional experience, and/or specific academic degrees or state licenses in the pertinent scientific discipline related to the critical area in question. experience and training in the applicable critical area. A qualified professional must have obtained a B.S. or B.A. or equivalent degree in biology, engineering, environmental studies, fisheries, geomorphology, or related field, and two years of related professional work experience. 1. A qualified professional for fish and wildlife habitats or wetlands must have a degree in biology, marine biology, wetland biology, or habitat ecology. 2. A qualified professional for a geologically hazardous area must be a professional civil engineer or geologist, licensed in the State of Washington. 3. A qualified professional for tree maintenance and tree pruning must be an arborist certified by the International Society of Arboriculture. QQ. “Protection/Maintenance (or Preservation)” means removing a threat to, or preventing the decline of, wetland conditions by an action in or near a wetland. This includes the purchase of land or easements, repairing water control structures or fences, or structural protection such as repairing a barrier island. This term also includes activities commonly associated with the term preservation. Preservation does not result in a gain of wetland acres, may result in a gain of functions, and will be used only in exceptional circumstances. RR. “Re-establishment” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former wetland. Re-establishment results in a gain in wetland acres (and functions). Activities could include removing fill material, plugging ditches, or breaking drain tiles. SS. “Reference condition” means a baseline standard, benchmark, or set of normal measurements used to compare and evaluate the health, quality, or performance of an ecosystem, environment, or scientific system. TT. “Rehabilitation” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural or historic functions of a degraded wetland. Rehabilitation results in a gain in wetland function but does not result in a gain in wetland acres. Activities could invoice breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. UU. “Restoration” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former or degraded wetland. For the purpose of tracking net gains in wetland acres, restoration is divided into re-establishment and rehabilitation. VV. “Riparian area” means the area that encompasses both sides of a water body, composed of aquatic ecosystems, riparian ecosystems, and riverine wetlands. WW. “Riparian management zone (RMZ)” means the area that has the potential to provide full riparian functions, often synonymous with the riparian buffer. This area occurs within one 200-year site potential tree height measured from the edge of the stream channel. In places where the site potential tree height is less than 100 feet, the RMZ is set at 100 feet to provide for the pollution removal function. XX. “Seismic hazard areas” are areas subject to severe risk of damage as a result of earthquake-induced ground shaking, slope failure, settlement, soil liquefaction, debris flows, lahars, or tsunamis. YY. “Setback” means the required minimum distance for any use, structure, or building from a hazard critical area or its buffer that establishes the building envelope within which any structure or building September 23, 2026 Planning Commission Regular Meeting 18 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 may be erected or placed. as required by a qualified professional to protect safety for occupants of a development and/or users of a site. ZZ. “Site potential tree height” means the average maximum height of the tallest dominant trees for a given age and site class. AAA. U “Topping or tree topping” means the indiscriminate cutting back of tree branches to stubs or lateral branches that are not large enough to assume the terminal role and is harmful to the life and health of the plant. Other names for topping include “heading”, “crowning”, or “tipping”. BBB.V. “Viewshed enhancement” means the removal or thinning of trees or vegetation to enhance a view when proposed in ravine and marine bluff critical area buffers so long as such alterations will not: 1. Increase geological hazards such as erosion potential, landslide potential, or seismic hazard potential as demonstrated by a qualified professional; 2. Adversely affect significant fish and wildlife habitat areas; 3. Through thinning, remove more than 30 25 percent of the live branches of a tree’s canopy; 4. Include felling, topping, or removal of trees in critical areas. Viewshed enhancement does not include nondestructive trimming of vegetation as defined in this title. CCC. “Wetland or wetlands” means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. However, wetlands may include those artificial wetlands intentionally created from non- wetland areas to mitigate conversion of wetlands, if permitted by the county or city. CHAPTER 15.20 ENVIRONMENTALLY SENSITIVE AREAS PROTECTION (MOVED TO CHAPTER 15.22) Chapter 15.20 is hereby deleted in its entirety and moved to a new chapter 15.22 for replacement. CHAPTER 15.22 CRITICAL AREAS ARTICLE I. GENERAL PROVISIONS 15.22.010 Purpose. A. The purpose of this chapter is to designate critical areas and to establish standards for the protection of and, where feasible, enhancement of, their functions and values, in compliance with the provisions of the Washington State Growth Management Act of 1990, and consistent with the goals and policies of the City of Port Angeles Comprehensive Plan, Climate Resiliency Plan, and Climate Resiliency Implementation Plan. B. By identifying and regulating development and alterations to critical areas and their buffers, this chapter seeks to accomplish the following goals: 1. Protect the public health, safety and welfare by avoiding disturbance of critical areas, minimizing unavoidable impacts, and mitigating impacts where necessary; September 23, 2026 Planning Commission Regular Meeting 19 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 2. Protect the public from personal injury, loss of life or property damage due to flooding, erosion, landslides, seismic events, or soil subsidence; 3. Protect against publicly financed expenditures in the event critical areas are misused, which causes: a. Unnecessary maintenance and replacement of public facilities; b. Publicly funded mitigation of avoidable impacts; c. Cost for public emergency rescue and relief operations where the causes are avoidable; or d. Degradation of the natural environment. 4. Protect the public trust in navigable waters and aquatic resources; 5. Prevent cumulative adverse impacts to water availability, water quality, wetlands, fish and wildlife habitat, and the overall net loss of wetlands, frequently flooded areas, and habitat conservation areas; 6. Protect unique, fragile, and vulnerable elements of the environment, including wildlife and its habitat; 7. Alert appraisers, assessors, owners, potential buyers, or lessees to the development limitations of critical areas; and 8. Implement the policies of the State Environmental Policy Act (SEPA), Chapter 43.21C RCW; the City of Port Angeles Comprehensive Plan; this chapter of the Port Angeles Municipal Code; and all updates and amendments, functional plans, and other land use policies formally adopted or accepted by the City of Port Angeles. C. The regulations of this chapter are intended to protect critical areas in accordance with the Growth Management Act, through the application of best available science, as determined according to WAC 365- 195-900 through 365-195-925, and in consultation with state and federal agencies and other qualified professionals. D. This chapter is intended to be administered with limited flexibility and attention to site-specific characteristics. It is not intended to make a parcel of property unusable by denying its owner reasonable economic use of the property, or to prevent the provision of public facilities and services necessary to support existing development and that planned for by the community without decreasing current service levels below minimum standards. E. The city’s enactment or enforcement of this chapter must not be construed for the benefit of any individual person or group of persons other than the general public. 15.22.020 Applicability. A. Unless explicitly exempted, the provisions of this chapter apply to all land uses, development activity, and all structures and facilities within the City of Port Angeles that are within a critical area, within the maximum buffer distance of, or likely to affect the functions and values of one or more critical areas. Responsibility for administration and enforcement of the provisions of this chapter must rest with the Director of Community and Economic Development or their designee. B. Relationship to Other Regulations. 1. Shorelines of the state and shorelands as defined in RCW 90.58.030, and critical areas occurring within the jurisdiction of shorelines of the state and shorelands, are regulated and protected through the City of Port Angeles Shoreline Master Program (PAMC Chapter 15.08), as amended. Activities occurring within the shoreline jurisdiction are reviewed through the shoreline permit review and issuance process; a separate critical areas permit is not required. The Shoreline Master Program incorporates by reference portions of this chapter; however, certain provisions of this chapter that are not consistent with the Shoreline Management Act, Chapter 90.58 RCW, and supporting Washington Administrative Code chapters do not apply in shoreline jurisdiction. September 23, 2026 Planning Commission Regular Meeting 20 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 2. These critical areas regulations apply in addition to zoning and other regulations adopted by the City. In the event of any conflict between these regulations and any other regulations of the City, the regulations apply that provide greater protection to the critical areas’ functions and values, as determined by the Director of Community and Economic Development. 3. When any provision of this chapter or any existing easement, covenant, or deed restriction conflicts with this chapter, that which provides more protection to the critical area applies. 4. Compliance with the provisions of this chapter does not constitute compliance with other federal, state, or local regulations and permit requirements. The applicant is responsible for complying with other agency requirements, apart from the process established in this chapter. 15.22.030 Identification, classification, and rating of Critical Areas. A. Critical Area Maps. The approximate distribution and extent of critical areas in the City are displayed on the City of Port Angeles’ critical areas maps. The maps are used to alert the public and City officials of the potential locations of critical areas and should act as a screening tool. As new information related to critical areas becomes available, the City is authorized to make changes as necessary to the critical area maps. Given the generalized nature of these maps and recognizing that critical areas and the processes that define them are dynamic, the actual presence and location of critical areas, as determined by qualified professionals and technical scientists, must be established and protected in accordance with all the provisions of this chapter, which must govern the treatment of proposed development sites. If any of the critical areas shown on the maps conflict with the criteria set forth in this chapter, the criteria must control the designation of the critical area. B. Actual Site Conditions. Regardless of whether a critical area is shown on the critical areas map, the actual presence or absence of the features defined in this code as critical areas will govern. The exact location of the boundary of a critical area must be determined through the performance of a field investigation as performed by a qualified professional, applying the definitions and criteria provided in this chapter, as determined necessary by the City. C. Classification and Rating. To promote consistent application of the standards and requirements of this chapter, critical areas within the City will be rated or classified using best available science according to their characteristics, functions and values, and/or their sensitivity to disturbance. 1. Classification of critical areas will be determined by the City using the following tools: a. Application of the criteria contained in these regulations; b. Consideration of the critical area reports submitted by qualified professionals in connection with applications subject to these regulations; and c. Review of maps and other resource adopted pursuant to this chapter. 2. Rating categories will not change due to illegal modifications of the critical area or its buffer. If the development proposal site contains or is within a critical area or buffer suspected of illegal modifications, the rating will be based on pre-modification conditions. Abatement of the unauthorized modification will be required prior to authorization of the current development proposal being processed for the subject site. 15.22.040 Protection of Critical Areas and Best Available Science. A. Critical areas and their required buffers may not be altered except as otherwise provided by this chapter. B. Any action taken pursuant to this chapter must result in equivalent or greater functions and values of the critical area associated with the proposed action, as determined by the best available science. No activity or use may be allowed that results in a net loss of the functions or values of critical areas. September 23, 2026 Planning Commission Regular Meeting 21 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 C. All permitted actions and development must be designed and constructed in accordance with mitigation sequencing per PAMC 15.22.12 to achieve no net loss of critical area functions and values. D. Applicants must first demonstrate an actual inability to avoid or minimize impacts before restoration and compensation of impacts will be allowed. E. Any individual critical area adjoined by another type of critical area must have the buffer and meet the requirements that provide the most protection to the critical areas involved. F. Violations of this chapter must be subject to the enforcement provisions of the Port Angeles Municipal Code. 15.22.050 Project evaluation. A. As part of the review, the City will: 1. Verify the information submitted by the applicant is complete and accurate; 2. Evaluate the project area and vicinity for any potential critical areas; 3. Determine whether the proposed project is likely to impact the functions or values of critical areas; and 4. Determine if the proposed project adequately addresses the impacts and follows the proper mitigation sequence to avoid, minimize, and mitigate the impacts. B. If the proposed project is within, adjacent to, or is likely to impact a critical area, the City will: 1. Require a critical area report from the applicant that has been prepared by a qualified professional, to be reviewed and evaluated; 2. Determine whether the development proposal conforms to the purposes and performance standards of this chapter, including the criteria in PAMC 15.22.060, Critical Areas Review; 3. Assess the potential impacts to the critical area and determine if they can be avoided or minimized; and 4. Determine if any mitigation proposed by the applicant is sufficient to protect the functions and values of the critical area, and the public health, safety, and welfare concerns consistent with the goals, purposes, objectives, and requirements of this chapter. C. The City may require third party review of any critical area report at the expense of the applicant. 15.22.060 Critical areas review. A. When required. A proposal to modify any critical area and/or the associated buffer including, but not limited to, clearing, grading, draining, removal or alteration of vegetation, construction of structures, utilities and related infrastructure, must require a critical area permit unless it qualifies as an exemption as provided in PAMC 15.22.070. Except that, for within shoreline jurisdiction, administration of this chapter must be through the Shoreline Master Program and the appropriate shoreline permit administration process set forth in PAMC Chapter 15.08. B. Best Management Practices. All activities, including those allowed without critical areas review, must be conducted using the best management practices appropriate for that activity that result in the least amount of impact to the critical area. Best management practices must be used for tree and vegetation protection, construction management, erosion and sediment control, water quality protection, and regulation of chemical applications to ensure the activity does not result in degradation to the critical area. Any incidental damage to, or alteration of, a critical area and/or buffer must be restored, rehabilitated, or replaced at the responsible party’s expense. C. Modifications to existing nonconforming structures and uses. Existing structures, activities, and uses that were established legally but do not meet the current critical area, buffer, or buffer setback requirements September 23, 2026 Planning Commission Regular Meeting 22 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 may continue in accordance with PAMC 17.95, nonconforming situations. The burden of proof is on the applicant to bring evidence in support of their position. The following modifications are allowed: 1. Routine maintenance and repairs; 2. Structural modifications or additions that do not intensify the nonconformity of the structure or increase the area of hardscape within the critical area or buffer. The Director may, at their discretion, require an updated critical area report to confirm locations of buffers and that the modification is located entirely outside the critical area or buffer; 3. Vertical additions above the ground floor that do not encroach further into the critical area or buffer beyond the existing exterior walls, except for additions in geologically hazardous areas that warrant further critical areas review. 4. Restoration or replacement of a structure that is damaged by fire or other natural disaster, except that critical areas review is required when located in a geologically hazardous area or buffer, when: a. A complete application for reconstruction or replacement is submitted within one year of the damage; and b. The restoration or replacement is made to conform to the current critical areas regulations, or if such regulations cannot be physically met without reducing the size of the structure, the restoration or replacement may not intensify any nonconformity that existed prior to the damage. 5. The demolition of structures located within critical areas or their buffers is permitted, excluding demolition of structures necessary to support or stabilize landslide or erosion hazard areas, subject to approval of a demolition permit, and a stormwater pollution prevention plan consistent with the adopted stormwater management manual. 15.22.070 Exempt activities. A. General requirements for all exempt activities. Activities listed in this section are exempt from the remaining provisions of this chapter only if they meet the specific terms of this section. B. To be exempt from this chapter does not give permission to degrade a critical area or buffer or to ignore risk from natural hazards. All exempt activities must use reasonable methods to avoid potential impacts to critical areas and buffers. In every instance, disturbance to the critical area or buffer must be minimized through best management practices and the use of low-impact equipment. C. Any incidental damage to, or alteration of, a critical area or buffer that is not a necessary outcome of the exempted activity must be restored, rehabilitated, or replaced at the responsible party’s expense and will require the submittal of an approved mitigation plan. D. This chapter may not exempt an activity from the provisions of other city permits such as clearing and grading, or agency permit requirements such as a WDFW Hydraulic Project Approval, or US Army Corps of Engineers regulatory requirements. E. The burden of proof is on the applicant to bring forth evidence that the activity meets the precise description of the exemption pursuant to this section. F. The following activities are exempt from the provisions of this chapter, provided they meet the precise description stated herein. No further critical areas review is required. 1. Emergencies. Those activities necessary to prevent an immediate threat to public health, safety, or welfare or that pose an immediate risk of damage to private property that require remedial or preventative action in a timeframe too short to allow for compliance with the requirements of this chapter, if the following requirements are met: September 23, 2026 Planning Commission Regular Meeting 23 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 a. Only the minimum intervention necessary to reduce the risk to public health, safety, or welfare and/or the imminent risk of damage to private property may be authorized by this exemption. b. The alteration undertaken must be reported to the Director no later than 14 days after the alteration has occurred. Failure to report the alteration in the time allotted will result in an unauthorized critical area modification pursuant to section 15.22.190. The Director will confirm that an emergency existed and determine what, if any, additional permits and/or measures are required of the property owner to protect the critical area(s) consistent with the provisions of this chapter, and to mitigate any damage to a pre-existing state. c. After the emergency, the person or agency undertaking the action must fully fund and conduct necessary site evaluations and critical area reports, mitigation plans, and restoration for any impacts to the critical area and buffers resulting from the emergency action pursuant to the review procedures of this chapter. Mitigation activities must be initiated within one year of the date of the emergency or as directed by the Department. d. If the Director determines that the action taken, or any part of the action taken, was beyond the scope of an allowed emergency action, or any required mitigation, the Director may take action to enforce the provisions of this chapter. 2. Landscape and garden maintenance. Maintenance of existing, lawfully established landscaping and gardens within a regulated critical area or its buffer including, but not limited to, cutting, mowing, weeding and hand removal of noxious and invasive species, harvesting and replanting of garden crops, pruning and planting of non-invasive ornamental vegetation or indigenous, native species to maintain the general condition and extent of such areas, provided that these maintenance activities do not further expand into critical areas or associated buffers, do not alter topography, do not destroy or clear native vegetation, do not remove non-hazard trees, and do not diminish water quality or quantity. Tree topping is considered a destructive vegetation practice and is not exempt. a. Native growth protection area, vegetation conservation areas, mitigation sites, or other areas protected via permit conditions, conservation easements, or similar restrictive covenants are not covered by this exemption. 3. Passive outdoor activities. Low impact activities such as hiking, kayaking, fishing, bird watching, photography, education, or scientific research that do not involve modifying the land or vegetation, and that will not adversely affect the functions and values of the critical area or its buffer. 4. Trail maintenance. Maintenance, operation, repair, modification, or replacement of existing trails and trail-related facilities within publicly improved parks and recreation areas may be performed subject to the following: a. The activity does not involve the material expansion of facilities, disturbance to adjacent areas is minimized, and disturbed areas must be immediately restored; b. Work is conducted using best management practices; c. Biological characteristics of the critical area and its buffer are not impaired and adverse impacts are minimized; d. Where trail relocation is the least impactful method of repair, trail relocation, provided it is further away from the critical area, is not considered a new trail, but is included in the exemption for operation, maintenance, repair, or replacement. 5. Forest practices regulated by the State. Forest practices regulated and conducted in accordance with the provisions of Chapter 76.09 RCW and forest practices regulations, Title 222 WAC, except for conversions to non-forestry uses. 15.22.080 Allowed uses or activities. September 23, 2026 Planning Commission Regular Meeting 24 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Applicability. Allowed uses or activities are those uses or activities that are unlikely to result in an impact to the critical area or its buffer because of other regulations or previous reviews. The following activities are exempt from the critical areas review process, but not the protection standards set forth in this chapter; provided that the activity or use is conducted in accordance with the applicable standards noted below. 1. All allowed activities must use mitigation sequencing and best management practices that result in the least amount of impact to the critical areas where practicable. Designation as an allowed activity does not give permission to degrade a critical area or ignore risk from natural hazards. Best management practices must be used for tree and vegetation protection, fish and wildlife protection, and regulation of chemical applications, all of which may be monitored by the City to ensure the activity does not result in degradation to the critical area or buffer. Any incidental damage to, or alteration of, a critical area that is not a necessary outcome of the allowed activity must be restored, rehabilitated, or replaced at the responsible party’s expense within one year of the disturbance to the satisfaction of the Director. 2. The applicant must provide the Director with an exemption request letter including drawings, plans, or other necessary documentation to determine whether additional City permits or approvals are needed to conduct the work. The letter must be submitted along with a critical area exemption application. 3. Unless otherwise specified, approvals will be valid for one (1) year per activity allowed; provided that there is no change in the scope of the project, including, but not limited to, the location and/or extent of the activity allowed under the notification process. 4. Upon receipt of the application, the Director may condition and provide guidance on best management practices for tree and vegetation protection, construction management, erosion and sediment control, water quality protection, and use of chemical applications to be used in the execution of the following activities: a. Site investigation. Minimal site investigative work and studies necessary for land use submittals, such as surveys, soil logs, percolation tests, water quality studies, scientific research, wildlife studies, and other related activities, where such activities do not require construction of new roads, removal of native trees or shrubs, and only minimal amounts of excavation and disturbed areas that must be immediately restored. b. Projects previously reviewed for critical areas impacts. Development permits and approvals that involve both discretionary land use approvals and construction approvals that do not need to undergo a new critical areas review. c. Minor additions to and modifications of existing structures. Existing structures or improvements that do not meet the requirements of this chapter may be remodeled, reconstructed, or replaced provided that the new construction does not further disrupt the critical area or its buffer. d. Activities within the improved right-of-way. Replacement, modification, installation, or construction of utility facilities, lines, pipes, mains, equipment or appurtenances, when such facilities are located within the improved portion of the public right-of-way or a city authorized private roadway. Any activity that alters a wetland or watercourse or that may result in the transport of sediment or increased stormwater runoff must result in; i. Increased buffer widths equal to the width of the right-of-way improvement, including disturbed areas; and ii. Retention and replacement of native vegetation or non-invasive, non-native vegetation along the right-of-way and resulting disturbance. e. Operation, maintenance, or repair. The operation, maintenance, or repair of existing structures or infrastructure, provided the activity does not alter or increase impacts to critical areas and there is no increased risk to life or property. September 23, 2026 Planning Commission Regular Meeting 25 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 f. Minor utility projects. Utility projects with minor or short-duration impacts to critical areas and no significant impact on the function or values of a critical area, provided such projects are constructed with best management practices and additional restoration measures. Such allowed minor utility projects must meet the following criteria: i. There is no practical alternative with less impact on the critical area; ii. The activity involves the placement of a small utility facility such as a street sign or pole; and iii. The activity involves disturbance of an area less than seventy-five (75) square feet of the critical area and/or its associated buffer. g. Public and private pedestrian trails. Except for wetlands and fish and wildlife habitat conservation areas or their buffers, new public and private pedestrian trails must be allowed pursuant to the following criteria: i. Trails and related facilities must, to the extent feasible, be placed on existing levees, road grades, utility corridors, or any other previously disturbed areas; ii. Trails and related facilities must be planned to avoid or minimize the removal of trees, shrubs, snags, and important wildlife habitat. When trees must be removed, a replacement plan must be developed in accordance with the requirements of this chapter; iii. Trail construction and maintenance must follow best management practices and minimize the use of impervious surface; iv. The trail surface must meet all other local, state, and federal requirements, including stormwater regulations. In areas where impervious trails and paths are used, permeable pavement must be used where feasible and must have a maintenance plan in place; and v. Trails proposed in geologically hazardous areas must be constructed to not increase the risk of landslide or erosion in accordance with an approved geotechnical report prepared by a qualified professional. h. Vegetation management practices. The following vegetation management practices within critical areas and their buffers are allowed: i. Removal of noxious weeds or invasive vegetation, as identified by the Washington State or Clallam County Noxious Weed Control Board with hand labor and light equipment. Chemical applications of herbicides may be used in accordance with the state Department of Fish and Wildlife Management Recommendations, the state Department of Agriculture, and the US Environmental Protection Agency; ii. Vegetation management consistent with a previously approved mitigation, restoration, remediation, or habitat enhancement project, provided that increased erosion, landslide, or other adverse impacts to the critical area do not result. Previously approved plans are valid for a maximum of five (5) years and must reference the best available science when prepared; iii. Non-destructive pruning and trimming of vegetation for maintenance purposes, provided the trees are not located in a landslide or erosion hazard area, and that best management practices consistent with the American National Standards Institute (ANSI) are utilized. Tree topping is considered a destructive practice and is not allowed; iv. Thinning of limbs of individual trees to provide for viewshed enhancement that will not harm tree health or vigor, using the pruning specifications set forth in the City of Port Angeles Urban Forest Management Plan and in accordance with ANSI tree pruning standards. Tree topping is considered a destructive practice and is not allowed. Any work September 23, 2026 Planning Commission Regular Meeting 26 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 that is found to be non-compliant with the provisions of this chapter will be subject to mitigation pursuant to the requirements in PAMC 15.22.140; and v. Vegetation removal or pruning must be done in a manner that minimizes disturbance and prevents adverse effects on soil stability, fish and wildlife habitat, water quality, or water quantity. i. Removal of hazard trees. Trees that pose a threat to life, public safety, or private or public infrastructure, as demonstrated by an ISA Certified Arborist with valid Tree Risk Assessment Qualification credentials, may be removed from critical areas or their buffer. The Arborist must prepare a report to be submitted with the application that addresses the following: i. A site plan identifying the location of the hazard tree(s) and their proximity to the critical area and any nearby targets; ii. A conclusion that the condition of concern constitutes a high risk to the targets identified or a threat to life or property; iii. Recommendations for mitigating the risk and what the residual risk is for each target identified. Creation of a habitat snag is preferred over full tree removal, where and when feasible; iv. If a tree to be removed provides critical habitat, such as an eagle perch or occupied nest, a qualified professional must be consulted to determine timing and methods of removal that will minimize and mitigate impacts; v. If a tree to be removed is within a geologically hazardous area or buffer, an evaluation of potential impacts on slope stability must be accompanied by a qualified professional, including recommendations for avoiding adverse impacts to slope stability. vi. A restoration plan for any removed tree or vegetation that includes species, size, and a maintenance plan. Trees and vegetation must be replaced at a 2:1 ratio using appropriate native species suitable to the project site. At a minimum, 50 percent of the replacement trees must be evergreen species. 15.22.090 Permitted uses or activities. A. Applicability. Uses permitted on properties which contain an area classified as a critical area must be the same as those permitted in the underlying zone. Each use must be evaluated in accordance with the review process required for the proposed use in the underlying zone in conjunction with the requirements of this chapter, state, and federal regulations. Nothing in this chapter is intended to preclude reasonable use of property. B. Review process. 1. A Type II critical area development permit is required for all permitted uses or activities, consistent with Chapter 18.02 PAMC. No permit may be issued unless it can be shown that the proposed development is fully consistent with the requirements of this chapter. The burden of proof is on the applicant to bring forth evidence in support of the application and upon which any decision has to be made on the application. 2. In addition to other project-related documents, all permitted land uses and developments proposed in an area listed, identified, inventoried, classified, or rated as a critical area must require supporting reports or studies, prepared by a qualified professional to describe the environmental limitations of the site, consistent with the requirements of sections 15.22.110 and 15.22.120 PAMC. 3. No construction activity, including clearing and grading, may be permitted until the information required by this chapter is reviewed and approved by the City as adequate. September 23, 2026 Planning Commission Regular Meeting 27 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 C. In addition to the uses permitted in the underlying zone, the following land uses, activities, or developments are permitted pursuant to the requirements of this chapter. 1. Buffer modifications. An applicant may apply for buffer modifications including increased buffer width, buffer averaging, and buffer alterations of critical areas as described specifically by this chapter. 2. Previously altered critical areas. If any portion of a critical area or its associated buffer has been altered from its natural state, the applicant may propose to develop within the altered area pursuant to the following decision criteria: a. The critical area was lawfully altered in accordance with the provisions of this chapter and any state and federal laws at the time the alteration occurred; b. The previous alteration has significantly disrupted the natural functions and values of the critical area; c. The new alteration does not further disrupt the natural functions and values of the critical area; d. The proposal uses to the maximum extent possible the best available construction, design, and development techniques which result in the least adverse impact on the critical area; and e. The proposal is consistent with the purpose and intent of this chapter and incorporates all other development standards of this chapter stated herein. 3. Drainage facilities. Streams or wetlands and their buffers may be altered for use as a drainage facility provided that all requirements of the City of Port Angeles Stormwater Management Plan and all other local, state, and federal laws are satisfied, and so long as increased natural resource functions are achievable and the benefits outweigh any lost resource. The Director may approve drainage facilities in these areas only where they determine that long-term impacts are minimal or where there are no practicable or reasonable alternatives and mitigation is provided. 4. Utility location by a public agency or utility district. Every attempt must be made to avoid locating utilities within critical areas and their buffer. The Director may approve the siting of new public utilities in critical areas pursuant to the following criteria: a. There is no other practical alternative to the proposed development with less impact on the critical areas. b. The application of the critical area regulations would unreasonably restrict the ability to provide utility services to the public. c. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site. d. The proposal attempts to protect and mitigate to the critical area functions and values consistent with the best available science. e. The proposal is consistent with other applicable regulations and standards. f. Stream crossings, whether for access or utility purposes, must be avoided to the extent possible; but when necessary due to the lack of feasible alternatives, crossing of streams must follow all applicable local, state, and federal laws and the following criteria: i. Bridges are required for streams which support salmonids, unless otherwise allowed by the Washington State Department of Fish and Wildlife; ii. All crossings using culverts must use superspan or oversize culverts; iii. Any work within the stream channel must be constructed and installed per the requirements of an applicable State hydraulics permit; iv. No work within the stream channel may occur in salmonid spawning areas; September 23, 2026 Planning Commission Regular Meeting 28 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 v. Bridge piers or abutments must not be placed in either the floodway or between the ordinary high water marks unless no other feasible alternative placement exists; vi. Crossings must not diminish flood-carrying capacity; vii. Crossings must provide for routine maintenance of culverts, bridges and utilities; and viii. Crossings must serve multiple properties whenever possible. 15.22.100 Reasonable use exceptions. Exceptions to the development restrictions and standards set forth in this chapter may be permitted by application to the Director of Community and Economic Development. Reasonable use exceptions must be processed as a Type III permit pursuant to the provisions of this section and Chapter 18.02 PAMC, with a final decision made by the Hearing Examiner after reviewing the recommendation of the Director. A. Reasonable use development exceptions. An applicant may propose a reasonable use development exception only if all economic use of a property would otherwise be denied, pursuant to the following criteria: 1. The proposal is limited to the minimum necessary to fulfill reasonable use of the property, and there is no other reasonable economic alternative; 2. The proposal is compatible in design, scale, and use with other development or potential development in the immediate vicinity of the subject property in the same zone and with similar site constraints; 3. The proposal utilizes to the maximum extent possible the best available construction, design, and development techniques which result in the least adverse impact on the critical area or areas based on the best available science; 4. The proposal is consistent with the purpose and intent of this chapter and will result in no net loss of ecological functions and values of the critical area consistent with the best available science; 5. When the functions and values of the critical area or its buffer will be disrupted, the applicant has prepared a mitigation plan per the requirements in PAMC 15.22.130 to offset losses. 6. In geologically hazardous areas, a reasonable use exception may only be granted if a qualified professional has determined that the development will not pose a threat to public safety or property. B. Critical area variance. The city may approve or approve with modifications of conditions and application for a critical area variance if all the following criteria are satisfied: 1. Special circumstances exist that are particular to the land, the lot, or something inherent in the land, and that are not applicable to other lands subject to the provisions of this chapter; and 2. The proposed development does not pose a threat to adjacent property or to public health and safety; and 3. Any proposed modification to a critical area will be evaluated through consideration of a critical area report and mitigation plan prepared by a qualified professional pursuant to the requirements of this chapter, and will be the minimum necessary to allow reasonable and economically viable use of the property. The report and mitigation plan must be prepared using best available science; and 4. Mitigation sequencing per PAMC 15.22.130 has been applied, and the proposal mitigates impacts to the critical area or buffer on site to the maximum extent possible, while still allowing reasonable use of the lot. Off-site mitigation may only be utilized when deemed necessary to achieve no net loss of ecological functions and values; and 5. The variance will not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and land use district in which the subject property is located; and 6. The granting of the variance is consistent with the general purpose and intent of the City of Port Angeles Comprehensive Plan, Climate Resiliency Plan, and other applicable planning policies. September 23, 2026 Planning Commission Regular Meeting 29 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE II. CRITICAL AREAS REVIEW PROCEDURES 15.22.110 Critical area report. A. Report required. All land uses and developments proposed in an area listed, identified, inventoried, classified, or rated, or likely to affect, one or more critical areas or within the required buffer, must include supporting reports or studies, prepared by a qualified professional, to describe the environmental limitations of the site. No construction activity, including clearing or grading, will be permitted until the information required by this chapter is reviewed and approved by the City as adequate. B. Critical area report sections. A critical area report must contain one or more of the following sections or report types unless exempted by the Director based on the extent of the potential impacts to the critical area or its associated buffer. The typical sequence of required sections or reports that will fulfill the requirements of this section include: 1. Reconnaissance. The existence, general location, and type of critical areas on, adjacent to, or likely to be impacted by activities on a project site. Determination of whether the project will impact or be at risk from the potential critical areas based on maximum potential buffers for the critical area type. Possible application of exemptions should also be addressed at this stage. If during site reconnaissance it is determined that the proposed development is unlikely to impact a critical area or its buffer, additional reporting may not be required; 2. Delineations. The extent, field verified boundaries, rating or classification, and applicable standard buffers of critical areas where the project area could impact the critical area or its buffer. An assessment of the characteristics of, or functions and values of the critical area and buffers must be identified; 3. Analysis. The proposal and impact assessment report documenting the potential project impacts to the critical area and buffers including a discussion of the efforts taken to avoid, minimize, and reduce potential impacts to those areas. 4. Mitigation. The measures that prevent or compensate for the potential impacts of the project designed to meet the requirements of this chapter, mitigation plan requirements defined in PAMC 15.22.13, and the standards for the specific critical area(s) impacted. Mitigation plans include, but are not limited to, habitat management plans, revegetation or replanting plans, and restoration plans; 5. Maintenance and monitoring. The goals of the mitigation proposed, performance standards for success, monitoring methods and reporting schedule, and contingency actions. Maintenance and monitoring plans must be consistent with the mitigation performance standards and requirements of this chapter, including the specific mitigation plan requirements outlined in each critical area type section. 15.22.120 Minimum report requirements. The critical area report must use scientifically valid methods and studies in the analysis of critical area data and field reconnaissance and reference the source of science used. The critical area report must evaluate the proposal and all probable impacts to critical areas and/or buffers in accordance with the provisions of this chapter. At a minimum, critical area reports must contain the following: A. The name and contact information of the applicant, a description of the proposal, and identification of the permit requested; B. A copy of the site plan for the development proposal showing: 1. The field verified location of the critical area, applicable buffer, and the development proposal with dimensions and setbacks; September 23, 2026 Planning Commission Regular Meeting 30 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 2. Limits of any areas to be cleared for the proposed development, any vegetation to remain, and a description of the proposed stormwater management plan for the development and consideration of impacts to drainage alterations. C. The dates, names, and qualifications of the persons preparing the report and documentation of any site investigations performed on the site; D. Identification and characterization of all critical areas and buffers adjacent to the proposed project area; E. A statement specifying the accuracy of the report, and all assumptions made and relied upon; F. An assessment of the probably cumulative impacts to critical areas resulting from the proposed development, including a landscape-scale assessment of the affected critical area; G. An analysis of site development alternatives, if applicable; H. A description of reasonable efforts made to apply mitigation sequencing pursuant to section 15.22.130 PAMC to avoid, minimize, and mitigate impacts to critical areas and buffers; I. Mitigation plans, as needed, to ensure no net loss of functions and values, in accordance with the mitigation plan requirements in section 15.22.140 PAMC. Where feasible, applicants are encouraged to strive for net ecological gain of the impacted critical area; J. A discussion of the performance standards applicable to the critical area and proposed activity; K. Financial guarantees to ensure compliance; and L. Any additional information required for the critical area as specified in the corresponding Article. 15.22.130 Mitigation sequencing. This section applies to mitigation required for all critical area reviews, approvals, and enforcement pursuant to this chapter. This section is supplemented with specific measures under sections for particular critical area types. Mitigation for specific development proposals may include a combination of the measures below and must be designed and constructed in accordance with the provisions of this section. Before impacting any critical area or its buffer, an applicant must demonstrate that the following actions have been taken to achieve no net loss of functions and values, or where feasible, enhancement of functions and values, in the following sequential order: A. Avoiding the impact altogether by not taking a certain action or parts of actions; B. Minimizing impacts by limiting the degree of magnitude of the action and its implementation by using appropriate technology, or by taking affirmative steps, such as project redesign, relocation, or timing to avoid or reduce impacts; C. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment; D. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; E. Compensating for the impact by replacing, enhancing, or providing substitute resources or environments; and/or F. Monitoring the impact and taking appropriate corrective measures. 15.22.140 Mitigation plan requirements. When the functions and values of a critical area or its buffer will be impacted, a mitigation plan must be prepared by a qualified professional utilizing mitigation sequencing as described in section 15.22.130 PAMC. Mitigation must be sufficient to restore impacted functions and values, or compensate for the impacted functions and values. At a minimum, the mitigation plan must consist of the following: September 23, 2026 Planning Commission Regular Meeting 31 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Baseline information. Quantitative data must be collected and analyzed for both the impacted critical area and the proposed mitigation site, if different from the impacted area. B. Environmental goals and objectives. Goals and objectives describing the purposes of the mitigation measures must be provided, including a description of the site selection criteria, identification of target evaluation species, and resource functions. The goals and objectives must be related to the functions and values of the impacted critical area and consistent with the best available science. Where feasible, applicants are encouraged to strive for net ecological gain of the impacted critical area; C. Performance standards. Specific criteria for fulfilling the environmental goals and objectives, and for beginning remedial action or contingency measures must be provided, including water quality standards, species richness and diversity targets, habitat diversity indices, or other ecological, geological, or hydrological criteria; D. Detailed construction plan. Written specifications and descriptions of mitigation techniques must be provided, including the proposed construction sequence, accompanied by detailed site diagrams and blueprints that are an integral requirement of any development proposal. E. Monitoring program. A program outlining the approach for assessing a completed project must be provided, including descriptions or proposed experimental and control site survey or sampling techniques. A monitoring protocol must be included outlining how the data will be evaluated by agencies that are tracking the progress of the mitigation project. Updates must be submitted at least twice-yearly documenting milestones, successes, issues, and contingency actions of the restoration or compensation project, for a minimum of two years as required by the Director. F. Contingency plan. A plan must be provided fully identifying potential courses of action and any corrective measures to be taken when monitoring or evaluation indicates project performance standards are not being met. G. Performance and maintenance securities. Securities ensuring fulfillment of the mitigation project, monitoring program, and any contingency measures must be posted pursuant to section 15.22.180 PAMC. 15.22.150 Critical area tracts. As a condition of any permit issued pursuant to this chapter, the permit holder may be required to create a separate critical area tract or tracts containing the areas determined to be a critical area in field investigations performed pursuant to this chapter. Critical area tracts are legally created tracts containing critical areas and their buffers that must remain undisturbed in perpetuity. Critical area tracts are an integral part of the lot in which they are created, are not intended for sale, lease or transfer, and must be included in the area of the parent lot for purposes of subdivision methods and zoning regulations. A. Legal protection of critical area tracts. When the Director of Community and Economic Development requires the creation of a critical area tract as a condition of any permit issued pursuant to this chapter, the critical area tract or tracts must be protected by one of the following methods to be determined by the Director of Community and Economic Development: 1. Easement. The permit holder must convey an irrevocable offer to dedicate to the City of Port Angeles, or other public or non-profit entity specified by the Director of Community and Economic Development, an easement for the protection of the critical area; or 2. Deed restriction. The permit holder must establish and record a permanent and irrevocable deed restriction on the property title of all lots containing a critical area tract or tracts created as a condition of any permit. Such deed restriction(s) must prohibit in perpetuity the development, alteration, or disturbance of vegetation within the critical area tract, except for purposes of habitat enhancement as part of an enhancement project which has received prior written approval from the City of Port Angeles and any other agency with jurisdiction over such activity. The deed restriction must also contain the following language: September 23, 2026 Planning Commission Regular Meeting 32 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 "Before beginning, and during the course of any grading, building construction, or other development activity on a lot or development site subject to this deed restriction, the common boundary between the area subject to the deed restriction and the area of development activity must be fenced or otherwise marked to the satisfaction of the City of Port Angeles". Additional note. The following note must appear on the face of all plats, short plats, PRDs, or other approved site plans containing separate critical area tracts and must be recorded on the title of record for all affected lots: "NOTE: All owners of lots adjoining separate critical area tracts identified as critical area easements or protected by deed restriction are responsible for maintenance and protection of the tracts. Maintenance includes ensuring that no alterations occur within the separate tract and that all vegetation remains undisturbed for other than natural reasons, unless the express written authorization of the City of Port Angeles has been received." B. Identification of critical area tracts. The common boundary between a separate critical area tract and the adjacent land must be permanently identified. 1. Signs. Identification must include permanent signs available from the Planning Division. Sign locations, wording, and size specifications must be approved by the Director of Community and Economic Development. 2. Fencing. The Director of Community and Economic Development may require permanent fencing for the purpose of delineating the critical area tract or tracts. C. Maintenance of critical area tracts. Responsibility for maintaining critical area tracts must be held by either the property owner, a homeowners' association, adjacent lot owners, the permit applicant or designee, or other appropriate entity as approved by the Director of Community and Economic Development. 15.22.160 Field identification and markings. A. Temporary field marking during construction. The outer perimeter of the critical area buffer and the clearing limits identified by an approved permit or authorization must be marked in the field with temporary “clearing limits” fencing in such a way as to ensure that no unauthorized intrusion will occur. This temporary marking and fencing must be maintained throughout development and may not be removed until permanent fencing and/or signs, if required, are installed. B. Permanent field marking. The decision maker may require installation of permanent signs, markers, and fencing along the outer perimeter of a critical area or its buffer when it is determined necessary to protect the critical area’s functions and values. Permanent fencing must be installed prior to final project approval or occupancy, as determined by the decision maker, consistent with the criteria in 15.22.150 PAMC. C. Maintenance and replacement. It is the responsibility of the landowner, successors, or as otherwise assigned to maintain in perpetuity and replace, if necessary, all permanent fencing and field markings. 15.22.170 Development plan review, monitoring, and inspections. A. The Director may require third party project building and development plans be reviewed by a qualified professional for confirmation of consistency with the critical area report and recommendations prior to approval of construction plans. B. The Director may require monitoring by a qualified professional during development activities within, or adjacent to, critical areas or buffers and/or a final inspection report by the qualified professional stating that development has or has not implemented the conditions design specifications provided in the project’s critical area report, and evaluation of any deviation from the recommendations. C. When the Director determines that such services are necessary to demonstrate compliance with the provisions of this chapter, they will be at the applicant’s expense. 15.22.180 Financial guarantee requirements. September 23, 2026 Planning Commission Regular Meeting 33 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Performance securities. The Director of Community and Economic Development may require the applicant of a development proposal to post a cash performance bond or other acceptable security to guarantee that the applicant will properly construct all structures and improvements as required by this chapter. The security must guarantee that the work and materials used in construction are free from defects. All securities must be on a form approved by the Director of Community and Economic Development. Until written release of the security, the security may not be terminated or canceled. The Director of Community and Economic Development must release the security upon determining that all structures and improvements have been satisfactorily constructed and upon the posting by the applicant of a maintenance security if one is required. B. Maintenance securities. The Director of Community and Economic Development may require the applicant to post a cash maintenance bond or other acceptable security guaranteeing that structures and improvements required by this chapter satisfactorily perform for a minimum of two years. This requirement must also apply in the case of required mitigation improvements. All securities must be on a form approved by the Director. Until written release of the security, the principal or surety may not be terminated or canceled. The Director must release the security upon determining that performance standards established for evaluating the effectiveness and success of the structures and improvements have been satisfactorily met. The performance standards must be approved by the Director and contained in the mitigation plan developed and approved during the review process. C. Renewable bonds. Any bonds required by this section may be in the form of one-year bonds to be renewed as appropriate. 15.22.190 Unauthorized critical area modifications. A. When a critical area of its buffer has been altered in violation of this Chapter, all ongoing development work must stop, and the critical area must be restored. Violations of this chapter are subject to the enforcement provisions of the Port Angeles Municipal Code at the owner’s or other responsible party’s expense to compensate for violation of provisions of this chapter. B. Requirement for restoration plan. All unauthorized development work must remain stopped until a restoration plan is prepared and approved by the Director of Community and Economic Development. Such a plan must be prepared by a qualified professional for the applicable critical area using currently accepted scientific principles and must describe how the actions proposed meet the minimum requirements of a mitigation plan as described in section 15.22.140. The Director may, at the owner’s or other responsible party’s expense, seek expert advice in determining the adequacy of the plan. Inadequate plans will be returned to the applicant or other responsible party for revision and re-submittal. 15.22.200 Final decision and appeals. A. Final decisions. All project permit determinations made pursuant to this chapter must be final concurrent with the final decision to approve, condition, or deny the underlying permit for the development proposal or other activity involved unless appealed pursuant to PAMC 18.02.220 and 18.02.230. B. Appeals. Any decision to approve, condition, or deny a development activity proposal or other activity based on the requirements of this chapter may be appealed pursuant to PAMC 18.02.220 and 18.02.230. CHAPTER 15.24 Wetlands Protection (MOVED TO CHAPTER 15.22) This chapter is hereby deleted in its entirety and moved to a new chapter 15.22 for replacement. September 23, 2026 Planning Commission Regular Meeting 34 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE III. Wetlands 15.22.210 Purpose A. The purpose of this article is to recognize and protect the many beneficial ecological functions and social services wetlands provide through regulated site planning to avoid or minimize impacts to wetlands wherever possible, to require that activities not dependent upon a wetland location be located in upland sites, and to achieve no net loss of the ecological functions and values wetlands provide through compensatory mitigation to offset losses which are unavoidable. B. This article is intended to be consistent with the requirements of Chapter 36-70A RCW and to implement the goals and policies of the City’s Comprehensive Plan, Climate Resiliency Plan, and Strategic Plan for protecting wetlands. 15.22.220 Identification, delineation, and rating. A. Identification. All areas that meet the criteria in the definition of a wetland consistent with RCW 36.70A.030 will be identified as critical areas and are subject to the provisions of this chapter. Wetlands are dynamic systems that can change over time; as such, delineations must be performed to adequately identify wetlands and their buffers. B. Delineation. The exact location of a wetland’s boundary must be determined through the performance of a field investigation by a qualified wetland professional using the latest version of the approved federal wetland delineation manual and regional supplements. Evidence documenting the results of the boundary survey, including evidence of a lack of wetland indicators if no wetlands are identified, must be submitted to the City with any development application. 1. The delineation should result in a wetland boundary clearly marked in the field and an accurate ground-verified map of the boundaries. The map should be created using either a professional survey or using an equivalent method such as GPS with sub-meter accuracy. The map should also include an indication of where wetlands exist off-site, when feasible. 2. Wetland delineations are valid for five (5) years; after such date, the City will determine if a revision or additional assessment is necessary. C. Rating. Wetlands must be rated according to the Washington Department of Ecology wetland rating system, as set forth in the Washington State Wetland Rating System for Western Washington: 2014 Update (Version 2), and as revised. The wetland categories determined by the rating are as follows: 1. Category I. Category I wetlands are: a. Relatively undisturbed estuarine wetlands larger than one acre; b. Wetlands of high conservation value that have been identified by scientists from the Washington Natural Heritage Program due to the presence of rare species or a rare or high-quality ecosystem type; c. Bogs; d. Wetlands with mature and old-growth forests over one acre in size; e. Wetlands in coastal lagoons; and f. Wetlands that perform many functions well, scoring a 23 or higher on the questions related to functions in the wetland rating form. These wetlands are those that represent a unique wetland type, are more sensitive to disturbance than most wetlands, or are relatively undisturbed and contain ecological attributes that are impossible to replace within on human lifetime. 2. Category II. Category II wetlands include: September 23, 2026 Planning Commission Regular Meeting 35 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 a. Estuarine wetlands smaller than one acre in size, or disturbed estuarine wetlands larger than one acre; b. Wetlands that score between 20 – 22 points on the questions related to functions on the wetland rating form. 3. Category III. Category III wetlands are: a. Wetlands with a moderate level of functions, scoring between 16-19 points on the wetland rating form; and b. Can often be adequately replaced with a well-planned mitigation project. 4. Category IV. Category IV wetlands are often heavily disturbed and have the lowest levels of functions, scoring less than 16 in the wetland rating. D. Illegal modifications. When a violation occurs, wetland rating categories do not change due to illegal modifications or alterations. A wetland’s category must be based on the pre-violation condition of the wetland. 15.22.230 Regulated and allowed activities. A. Regulated activities. All development activities and uses are prohibited in wetlands and wetland buffers, unless administered through the permit procedures established in this chapter, and only when it is demonstrated that the activity or use will not result in a net loss of ecological functions and values of the wetland through the application of mitigation sequencing as demonstrated in a critical area report. The following activities are regulated unless otherwise exempted by PAMC 15.22.070 if they occur in a wetland or its buffer: 1. The removal, excavation, grading, or dredging of soil, sand, gravel, minerals, organic matter, or material of any kind; 2. The dumping of, discharging of, or filling with any material; 3. The draining, flooding, or disturbing of the water level or water table; 4. Pile driving; 5. The placing of obstructions; 6. The construction, reconstruction, demolition, or expansion of any structure; 7. The destruction or alteration of wetland vegetation through clearing, harvesting, shading, intentional burning, or planting of vegetation that would alter the character of a regulated wetland, provided that these activities are not part of a forest practice governed under Chapter 76.09 RCW and its rules; 8. Activities that result in a significant change of water temperature, a significant change of physical or chemical characteristics of wetland water sources, including quantity, or the introduction of pollutants; 9. Land divisions and land use permits that contain regulated wetlands or their buffers or, that may impact a regulated wetland or its buffer, must comply with the following procedures and development standards: a. Land that is located wholly within a wetland and/or its buffer may not be subdivided; b. Land that is located partially within a wetland or its buffer may be subdivided; provided, that an accessible and contiguous portion of each new lot: i. Is located outside of the wetland and its buffer, and ii. Meets the minimum lot size requirements of the underlying zone as defined in Title 17. September 23, 2026 Planning Commission Regular Meeting 36 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 c. Land division approvals must be conditioned to require that regulated wetlands and wetland buffers be dedicated as open space tracts, or as an easement or covenant encumbering the wetland and wetland buffer. Such dedication, easement or covenant must be recorded together with the land division and represented on the final plat and title; c. The use of clustered development or similar innovative site planning is strongly encouraged for projects with regulated wetlands and buffers on the project site to accommodate innovation, creativity, and design flexibility; d. After preliminary approval and prior to the final land division or other land use permit approval, the department may require that the common boundary between a regulated wetland and associated buffer and the adjacent land be identified using permanent signs and/or fencing consistent with PAMC 15.22.150 and 15.22.160. 10. Stormwater management facilities may not be located within wetland buffers, with the following exceptions: a. Conveyance systems may be located in wetland buffers on a case-by-case basis if deemed necessary and approved by the Director of Public Works and Utilities. b. Full dispersion of flow, as described in BMP T5.30 of the Department of Ecology's most current SWMMWW, may be allowed in a wetland buffer if approved by the Director of Public Works and Utilities. c. The facilities or methods specified in subsections 10.a and b of this section are allowed only if impacts to the buffer, resulting from their installation, are avoided or mitigated. 11. Stormwater management design and facilities must be consistent with PAMC Section 13.63.190, to protect wetland hydrology and wetland functions. Native vegetation enhancement in wetland buffers may be approved for both buffer enhancement and as part of a best management practice to meet low impact development stormwater standards required by the Washington State Department of Ecology. Any stormwater management facility or method associated with wetlands must meet the state requirements adopted in PAMC Section 13.63.190. B. Allowed activities. In addition to those uses or activities allowed under PAMC section 15.22.080, the following uses or activities may be allowed within a wetland or wetland buffer to the extent they are not prohibited by any other ordinance or law and provided they are conducted using best available science, except where such activities result in the conversion of a regulated wetland or buffer to a use which it was not previously subjected: 1. Conservation or preservation of soil, water, vegetation, fish, shellfish, and other wildlife that does not include changing the structure or functions of the existing wetland or buffer; 2. The harvesting of wild crops in a manner that is not detrimental to the natural reproduction of such crops and provided the harvesting does not require tilling of soil, planting of crops, or alteration of the wetland or buffer by changing existing topography, water condition or quality, or water sources; 3. Existing and ongoing agricultural activities that minimize adverse impacts to wetlands, water quality, riparian ecology, salmonid populations, and wildlife habitat. New agricultural activities or existing activities that remove trees, divert or impound water, involve excavation, ditching, draining, culverting, filling, grading, or similar activities that introduce adverse impacts to wetlands are not allowed. a. For all existing and ongoing agricultural activities, the use of best management practices as established by the Natural Resource Conservation Service (NRCS), farm conservation plans, and incentive-based programs to improve agricultural practices in and near wetlands must be used to the extent feasible. 4. The maintenance, but not creation, of existing drainage ditches; 5. Navigation aids and boundary markers; and September 23, 2026 Planning Commission Regular Meeting 37 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 6. Boat mooring buoys. C. Special permit uses. Any activity or use other than those specified in this chapter may not be conducted in wetlands or wetland buffers except upon issuance of a critical area development permit by the Director of Community and Economic Development. 15.22.240 Wetland buffers. A. Standard buffer zone widths. Wetland buffer zones are required for all regulated activities adjacent to or likely to impact a regulated wetland to protect the integrity, functions and values of the wetland. The buffer standards required by this chapter presume the existence of a dense vegetation community in the buffer adequate to protect the wetland functions and values. When a buffer lacks adequate vegetation, the Director may increase the standard buffer, require buffer planting or other enhancements, and/or deny a proposal for buffer reduction or buffer averaging. Buffers may not include areas that are functionally and effectively disconnected from the wetland by an existing public or private road. Functionally and effectively disconnected means that the road stops the protective measures provided by a buffer or it disrupts the life cycle of wildlife documented to be using the area. The standard buffer widths will be based on the wetland category, the intensity of the proposed adjacent land use, and the functions or special characteristics of the wetland that need to be protected as determined through the rating system. If a wetland meets more than one of the characteristics listed, the buffer width be that of the widest one: 1. Category I Wetlands. For wetlands rated as a Category I wetland with a score for all three basic functions greater than or equal to 23 points, or having the “special characteristics” identified in the rating system, the following buffer widths apply: Wetland Characteristics Wetlands of high conservation value or Bogs 250 190 125 200 150 100 based on score for habitat functions or water quality 300 225 150 150 110 75 100 75 50 above, but still rated as 100 75 50 2. Category II Wetlands. For wetlands rated as a Category II wetland with a score for all three basic functions of 20 – 22 points or having the “special characteristics” identified in the rating system, the following buffer widths apply: September 23, 2026 Planning Commission Regular Meeting 38 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Wetland Characteristics Score of 8-9 for habitat function 300 225 150 150 110 75 100 75 50 above, but still rated as 100 75 50 3. Category III Wetlands. For wetlands rated as a Category III wetland with a score for all three basic functions of 16 – 19 points, the following buffers widths apply: Wetland Characteristics Score of 6-7 for habitat function 150 110 75 80 60 40 4. Category IV Wetlands. For wetland rated as a Category IV wetland scoring less than 16 points for all functions, the following buffer widths apply: Wetland Characteristics Score for all three basic functions less than 16 points 50 40 25 B. Land use intensity. For buffer width determinations as shown above, the land use intensity rating is as follows: conversion to high-intensity agriculture, high-intensity recreation such as golf courses or ball fields, hobby farms, and residential development than 75% maximum site coverage, moderate- such as parks with paved trails, conversion to moderate-intensity agriculture, hobby farms, with regulated forestry activities, and utility corridors or easements trails made of a pervious surface, utility corridors or easements with September 23, 2026 Planning Commission Regular Meeting 39 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 C. Increased buffer widths. The Director may require increased standard buffer widths on a case-by-case basis when a larger buffer is necessary to protect the functions and values of the wetland, based on local conditions. This determination must be supported by appropriate documentation showing that it is reasonably related to the protection of the functions and values of the regulated wetland. Such determination will be attached as a permit condition and must demonstrate that: 1. A larger buffer is necessary to maintain viable populations of existing species; or 2. The wetland is used by species proposed or listed by the Federal Government or the State as endangered, threatened, rare, monitor, or sensitive, critical or outstanding potential habitat for those species, or has unusual nesting or resting sites, such as heron rookeries or raptor nesting trees; or 3. The adjacent land is susceptible to severe erosion, and erosion control measures will not effectively prevent adverse wetland impacts; or 4. The adjacent land has minimal vegetative cover or slopes greater than 15 percent. D. Reduction of standard buffer widths. No buffer may be reduced unless buffer averaging is infeasible. The Director may reduce the standard wetland buffer width for proposed land uses with high-intensity impacts to those recommended for moderate-intensity impacts on a case-by-case basis where it can be demonstrated that: 1. For wetlands that score moderate or high for habitat (6 points or more for the habitat functions), the width of the buffer can be reduced if both of the following criteria are met: a. A relatively undisturbed, vegetated corridor of at least 100-feet wide is protected between the wetland and any other Priority Habitats as defined by the Washington Department of Fish and Wildlife. The corridor must be protected for the entire distance between the wetland and the Priority Habitat by some type of legal protection such as a conservation easement. b. Measures to minimize the impacts of different land uses on wetlands, such as the examples provided in table 15.22.240-1 below, are applied. 2. For wetlands that score less than 6 points for habitat, the buffer width can be reduced to that required for moderate land-use impacts if measures to minimize the impacts of the proposed land use are applied as provided in table 15.22.240-1. Table 15.22.240-1 Measures to Minimize Impacts on Wetlands Activities and Uses that Cause Measures to Minimize Impacts Lights • Parking lots • Warehouses • Manufacturing • Residential • Direct lights away from wetlands • Use of shielded light fixtures Noise • Manufacturing • Residential • Locate noise-generating activities away from wetlands Toxic runoff • Parking lots • Roads • Manufacturing • Residential areas • Large-scale use of pesticides • Landscaping and excessive fertilizer use • Route all new, untreated runoff away from wetland while ensuring the wetland is not dewatered • Apply integrated pest management and best practices September 23, 2026 Planning Commission Regular Meeting 40 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Stormwater runoff • Parking lots • Roads • Manufacturing • Residential areas • Commercial • Landscaping • Retrofit stormwater detention and treatment for roads and existing adjacent development • Prevent channelized flow from lawns that directly enters the buffer Change in water regime • Impermeable surfaces • Lawns • Tilling • Infiltrate or treat, detain, and disperse into buffer new runoff from impervious surfaces and Pets and human disturbance • Residential areas • Parks and recreation • Use privacy fencing or plant dense vegetation to delineate buffer edge and to discourage disturbance using vegetation appropriate for the ecoregion; place wetland and its buffer in a E. Standard buffer width averaging. Standard buffer widths may be modified by averaging buffer widths to improve wetland protection or to allow for reasonable use of a parcel. 1. Averaging to improve wetland protection may be permitted when all the following conditions are met: a. The wetland has significant differences in characteristics that affect its habitat functions, such as a wetland with a forested component adjacent to a degraded emergent component or a dual- rated wetland with a Category I area adjacent to a lower rated area; b. The buffer is increased adjacent to the higher-functions area of habitat or more sensitive portion of the wetland and decreased adjacent to the lower-functioning or less sensitive portion; c. The total area of the buffer after averaging is equal to the area required without averaging; and d. The buffer is at its narrowest point is never less than 75 percent of the required width. 2. Averaging to allow reasonable use of a parcel may be permitted when all the following criteria are met; a. There are no feasible alternatives to the site design that could be accomplished without buffer averaging; b. The averaged buffer will not result in degradation of the wetland’s functions and values as demonstrated by a report from a qualified wetland professional; c. The total buffer area after averaging is equal to the area required without averaging; and d. The buffer at its narrowest point is never less than 75 percent of the required width or, 75 feet for Category I and II, 50 feet for Category III, and 25 feet for Category IV, whichever is greater. F. Measurement of buffer widths. All buffers must be measured perpendicularly from the wetland boundary as surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for approved wetland alterations must be the same as the buffer required for the category of the created, restored, or enhanced wetland. G. Buffers on mitigation sites. All wetland mitigation sites must have buffers consistent with the buffer requirements of this chapter. Buffers must be based on the expected or target category of the proposed wetland mitigation site once the mitigation actions are taken. September 23, 2026 Planning Commission Regular Meeting 41 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 H. Building setbacks from buffers. Buildings, structures, paving, and other impervious surfaces must be set back 15 feet from the edge of any wetland buffer. The setback must be identified on a site plan that is submitted with the development application. Minor intrusions into the area of the building setback may be allowed if the Director of Community and Economic Development determines that such intrusions will not negatively impact the wetland’s functions and values, or the critical root zone of trees within the buffer. The following minor intrusions into the buffer may be allowed: 1. Landscaping, provided no non-native invasive species are used in the landscaping; 2. Uncovered decks, roof eaves and overhangs, unroofed stairways and steps; 3. Pervious ground surfaces, such as driveways, patios, and parking may be allowed; provided, that they are engineered as a permeable pavement system. Such improvements may be subject to the requirements in PAMC Chapter 13.63, Stormwater – Utility and Regulations. I. Buffer maintenance. Except where otherwise specified or allowed in this accordance with this chapter, final buffer conditions must be retained in an undisturbed or enhanced condition. In the case of compensatory mitigation sites, removal of nonnative weeds may be required for the duration of the mitigation bond. J. Buffer impacts. Wetland impacts must be avoided and minimized to the greatest extent practicable. Unavoidable impacts to wetlands must be offset by compensatory mitigation to achieve no net loss of wetland functions and values. Mitigation must occur on the same site when feasible or within the same wetland system, when possible. K. Allowed buffer uses. The following uses may be allowed within a wetland buffer in accordance with the review procedures of this chapter, provided they are not prohibited by any other applicable law, and they are conducted in a manner so as to minimize the impacts to the buffer and adjacent wetland: 1. Conservation or restoration activities aimed at protecting the soil, water, vegetation, or wildlife; 2. Passive recreation facilities designed in accordance with an approved critical area report, including: a. Walkways and trails, provided that they are limited to minor crossings having no adverse impact on water quality. They should be generally parallel to the perimeter of the wetland, located only in the outer 25% of the wetland buffer area, and located to avoid removal of significant, mature, or old-growth trees. The trail surface must be limited to five (5) feet in width and designed using permeable materials for pedestrian use only. b. Wildlife viewing structures that are designed to minimize impacts to the buffer. 3. Educational and scientific research activities; 4. Normal and routine maintenance and repair of any existing public or private facilities within an existing right-of-way, provided that the maintenance or repair does not increase the footprint or use of the facility or right-of-way. 5. The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops and provided the harvesting does not require tilling of soil, planting of crops, chemical applications, or the alteration of the wetland by changing existing topography, water conditions, or water sources. 6. Drilling for utilities/utility corridors under a buffer, with entrance/exit portals located completely outside of the wetland buffer boundary, provided that the drilling does not alter the ground water connection to the wetland or percolation of surface water down through the soil column. Specific studies by a hydrologist are necessary to determine whether the ground water connection to the wetland or percolation of surface water down through the soil column would be disturbed. 7. Enhancement of a wetland buffer through the removal of non-native, invasive plant species by hand. All removed plant material must be taken away from the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed Control Board list of noxious weeds should be handled and disposed of according to a noxious weed control plan appropriate to that species. Revegetation September 23, 2026 Planning Commission Regular Meeting 42 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 with appropriate native species at natural densities is allowed in conjunction with removal of invasive plant species. 8. Repair and maintenance of legally established non-conforming uses or structures, provided they do not increase the degree of nonconformity. L. Overlapping critical area buffers. If buffers for two critical areas overlap, such as buffers for a stream and a wetland, the wider buffer applies. 15.22.250 Critical area report additional requirements. Unless specifically waived by the Director of Community and Economic Development, the following information is required for any proposed use or activity in a wetland or its buffer, in addition to the minimum critical area report requirements pursuant to PAMC 15.22.120. A. A wetland report must be prepared by a qualified wetland professional. B. Wetland Report. The following areas must be addressed in the wetland report: 1. The project area of the proposed activity; 2. All wetlands identified within 300 feet of the project area; 3. The wetland rating and associated buffer for all wetlands identified within 300 feet of the project area; 4. All shorelines, floodplains, or other applicable critical areas and their associated buffers within 300 feet of the project area. 5. A wetland analysis that includes a written assessment and accompanying maps of the wetlands and buffers within 300 feet of the project area, including the following information at a minimum: a. Wetland delineation, size (acreage) and required buffers based on a professional survey from the field delineation; b. Wetland category, including a description of and score for each function, per wetland ratings PAMC 15.22.220.C; c. Cowardian classification system and vegetation class, as well as the area of each class present; d. Hydrogeomorphic class or classes; e. Soil and substrate conditions; f. Topographic elevations, at two-foot contours; g. An assessment of mitigation sequencing including avoidance, minimization, and mitigation proposed to ensure no net loss of wetland ecological functions and values, clearly identifying and describing any proposed unavoidable impacts and the compensatory mitigation planned for each impact. 15.22.260 Mitigation requirements specific to wetlands. As a condition of any permit allowing alteration of wetlands and/or wetland buffers, or as an enforcement action for illegal modifications to a wetland and/or its buffer, the applicant or violator must engage in compensatory mitigation to offset the impacts resulting from the applicant’s or violator’s actions. A mitigation plan must be developed that is consistent with the minimum plan requirements pursuant to PAMC 15.22.140 and the Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans (Ecology Publication No. 06-06-011b, Olympia WA, March 2006 or as revised). The overall goal of any compensatory mitigation project must be to achieve no net loss of wetland functions and values, and to strive for a net gain over present conditions where feasible. September 23, 2026 Planning Commission Regular Meeting 43 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Preference of mitigation actions. Mitigation actions must describe how the activity will improve wetland functions, environmental processes, or both, and must occur in the following order of preference after mitigation sequencing has been applied: 1. Restoration: Re-establishment of a former wetland that results in a gain in wetland area and functions through the manipulation of the physical, chemical, or biological characteristics of a site. Examples include removing fill, plugging ditches, or breaking drain tiles to restore a wetland hydroperiod, which in turn will lead to restoring wetland biotic communities and environmental processes. 2. Restoration: Rehabilitation of hydrologic processes to a degraded wetland that results in a gain in wetland function but does not result in a gain in wetland area. Examples include breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. 3. Establishment (creation) of new wetland area and functions in a location where they did not previously occur. Establishment results in a gain in wetland area and functions. 4. Preservation (protection) of high-quality, at-risk wetlands when done in combination with creation and re-establishment. Preservation as the sole means of mitigation for wetland impacts may be allowed if the wetland area to be preserved meets all the following criteria: a. The preservation site is determined to be under imminent threat of destruction, adverse modification, or substantive degradation, specifically sites with the potential to experience a high rate of undesirable ecological change due to on- and/or off-site activities; b. The area proposed for protection is of high quality (scores between 20 – 27 points in the wetland rating system), or is critical to the health and ecological sustainability of the watershed or sub- basin. Some of the other high-quality features include: i. Category I or II wetlands using the most recent version of the Wetland Rating System for western Washington, including Wetlands of High Conservation Value; ii. Rare wetland types such as bogs, mature forested wetlands, estuaries, coastal lagoons, or those of high regional or watershed importance; iii. Habitat for threatened or endangered species (state, federal, or both); iv. Provides biological and/or hydrologic connectivity; v. Of regional or watershed importance as indicated in a watershed, salmon recovery, or basin plan; vi. Large size with high species diversity (plants, animals, or both), high abundance of native species, or both; vii. A site that is continuous with the head of a watershed, or with a lake or pond in an upper watershed that significantly contributes to hydrologic processes and water quality. c. The protected wetland and buffer are protected in perpetuity through a conservation easement, deed restriction, or dedication as a separate tract; d. Establishment, restoration, and enhancement opportunities have also been considered, and preservation is the best mitigation option; and e. The site includes buffer areas adequate to protect the habitat and its functions from encroachment and degradation over time. 5. Enhancement of significantly degraded wetlands in combination with restoration or creation. Such enhancement should be part of a mitigation package that includes replacing the impacted area to meet appropriate ratio requirements. Special consideration must be given to the presence of Oregon Spotted Frogs, as they often use lower-quality wetland habitats that are often dominated by reed canary grass. Examples of enhancement projects may include the following: September 23, 2026 Planning Commission Regular Meeting 44 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 a. Removal of invasive species, including roots and root mats, such as reed canary grass, purple loosestrife, knotweed, or any other recognized noxious weed as identified by the Clallam County Noxious Weed Board; b. Scarification of soil and addition of organic material or other soil amendments; c. Planting trees and shrubs as an emergent wetland dominated by non-native vegetation; d. Grading to establish multiple hydrologic regimes, from long duration seasonally inundated to saturated; and e. Adding habitat features such as snags, large woody debris, brush piles, rock piles, and nest boxes. B. Compensatory mitigation locations. Under the 2008 Federal Mitigation Rule, applicants are required to use a watershed approach for compensatory mitigation to the extent appropriate and practicable. The goal is to maintain and improve the quality and quantity of aquatic resources within watersheds through strategic selection of compensatory mitigation sites, based on the following: 1. An understanding of how environmental processes, such as the movement of water, determine the characteristics and functions in a watershed; 2. Determining the extent to which the hydrologic processes, and thus the biological processes, have been altered; 3. Identifying areas where these environmental processes can be most effectively restored and where they need to be protected or maintained; and 4. Using compensatory mitigation to restore and protect those processes and replace wetland functions and types that are relatively rare or limited in the watershed due to historic losses. C. Mitigation banking. Credits from a wetland mitigation bank certified under Chapter 173-700 WAC may be used to compensate for impacts located within the service area specified in the mitigation bank instrument, if: 1. The proposal would provide appropriate compensation for the proposed impacts; 2. The impact site is located in the same service area as the bank; 3. The proposed use of credits is consistent with the terms and conditions of the certified mitigation bank instrument; and 4. Replacement ratios using bank credits are consistent with replacement ratios specified in the certified mitigation bank instrument. D. In-Lieu Fee Mitigation. Development or use of an in-lieu fee program is allowed if the program is established consistent with federal and state regulations and policies. Using credits from an approved in-lieu-fee program must be consistent with mitigation sequencing pursuant to PAMC 15.22.130. E. Mitigation Ratios. The following ratios in table 15.22.260-1 and consideration of factors described in this section must be used to determine the relative amount of created, re-established, re-habilitated, enhanced , or preserved that will be required to replace impacted wetlands. The first number refers to the amount of wetland area providing mitigation and the second refers to the amount of wetland area impacted or altered. If a mitigation bank or in-lieu-fee program is used for mitigation requirements, wetland ratios are not applied. The mitigation bank credit system or in-lieu fee program credit system, whichever applies, is used to determine the number and cost of the credits to be purchased to fulfill mitigation requirements. Table 15.22.260-1 Wetland Mitigation Ratios Creation or Re- establishment Re-habilitation Enhancement Preservation September 23, 2026 Planning Commission Regular Meeting 45 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Category I, Mature Forested Wetlands 6:1 12:1 24:1 24:1 Category I, Estuarine 4:1 8:1 Case-by-case 16:1 Category I, Coastal Lagoons 4:1 8:1 Case-by-case 16:1 Category II 3:1 6:1 12:1 16:1 Category III 2:1 4:1 8:1 10:1 (may be case- by-case) Category IV 1.5:1 3:1 6:1 Case-by-case (range from 5:1 to 10:1) 15.22.270 Performance Standards and Requirements. A. Mitigation performance standards. The performance standards in this section must be incorporated into the mitigation plans submitted to the City for impacts to wetlands and/or wetland buffers. The following standards apply to any mitigation proposed within Category I, II, III, and IV wetlands and their buffers. Modifications to these standards consistent with the guidance in “Wetland Mitigation in Washington State: Part 2 – Developing Mitigation Plans” may be considered for approval by the decision-maker as alternatives to the following: 1. Plants native to the region must be used; 2. Plant species selection must be consistent with the existing or projected hydrologic regime, including base water levels and stormwater event fluctuations; 3. Plant species selection must be consistent with the site environmental conditions, such as slope, aspect, soils, and exposure to the elements; 4. Plants should be commercially available or available from local sources. Small-form, bare-root plants are preferred over large specimens to reduce disturbance when planting; 5. Native plants species high in food and cover value for fish and wildlife should be prioritized, as appropriate, for the site; 6. Plant selection must be selected or approved by a qualified professional biologist, botanist, or ecologist; 7. A planting plan must be approved by the city; 8. Stockpiling soil and construction materials should be limited to upland areas outside of any tree protection zones, and contract specifications must limit stockpiling of materials to durations in accordance with city clearing and grading standards, unless otherwise approved by the City. 9. Irrigation must be installed or watering afforded by trucks or hoses to provide water for installed plants or seeded areas to supplement rainfall to ensure plants survive the first two years after installation. 10. All construction specifications and methods must be approved by a qualified professional and the city. The city reserves the right to inspect all ongoing work on site through project completion. September 23, 2026 Planning Commission Regular Meeting 46 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE IV. CRITICAL AQUIFER RECHARGE AREAS 15.22.280 Purpose. A. Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect on aquifers used for potable water, including areas where an aquifer that is a source of drinking water is vulnerable to contamination that would affect the potability of the water, or is susceptible to reduced recharge, as defined by WAC 365-190-030. B. The purpose of this article is to protect the functions and values of groundwater by preventing pollution and maintaining supply, should the City intend to use CARAs for future public water supplies. The quality and quantity of groundwater in an aquifer is inextricably linked to its recharge area. It is the intent of this article to safeguard groundwater resources by mitigating or precluding future discharges of contaminants from new development activities and redevelopment activities. 15.22.290 Applicability and designation. A. Applicability. The provisions of this article apply to regulated facilities that are within or adjacent to those portions of the City of Port Angeles designated as critical aquifer recharge areas on the City’s critical areas map. Regulated activities or facilities are defined as those commercial, industrial, and home occupation uses that: 1. Process or handle hazardous materials in regulated quantities; and/or 2. Treat or store regulated quantities of hazardous materials. B. Designation. Critical aquifer recharge areas are those areas that include one or more of the following: 1. Areas served by groundwater which have been designated as a “sole source aquifer area” under the Federal Safe Drinking Water Act; 2. Areas designated as “wellhead protection areas” defined by the boundaries of the 10-year time of groundwater travel or boundaries established using alternate criteria provided by the Washington State Department of Health in those settings where groundwater time of travel is not a reasonable delineation criterion, in accordance with WAC 246-290-135; 3. Susceptible groundwater management areas that have been designated as moderately or highly vulnerable or susceptible in an adopted groundwater management program developed pursuant to Chapter 173-100 WAC; 4. Special protection areas defined by WAC 173-200-900; or 5. Moderately or highly vulnerable aquifer recharge areas to degradation or depletion because of hydrogeologic characteristics that are delineated by a hydrogeologic study prepared in accordance with the State Department of Ecology guidelines. 15.22.300 Regulated activities. A. Activities or uses that do not cause degradation of groundwater quality and will not adversely affect the recharging of the aquifer may be permitted in a critical aquifer recharge area, and do not require preparation of a critical area report; provided, that they comply with the City of Port Angeles stormwater management regulations and applicable state and federal regulations. These activities typically include residential, commercial, and industrial development that does not include storage, processing, or handling of any dangerous waste of hazardous substance, or other development that does not substantially divert, alter, or reduce the flow of ground or surface waters. September 23, 2026 Planning Commission Regular Meeting 47 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 B. Activities that have the potential to cause degradation of groundwater quality or adversely affect the recharging of the aquifer may be permitted in critical aquifer recharge areas only in accordance with an approved critical area report and mitigation plan. These activities include, but are not limited to: 1. Aboveground/Underground Storage Tanks or vaults. The City of Port Angeles specifically regulates and authorizes permits for aboveground and underground storage tanks pursuant to the International Fire Code and this chapter. The Washington Department of Ecology also regulates and authorizes permits for underground storage tanks pursuant to Chapter 173-360 WAC. The removal of abandoned The City of Port Angeles Fire Department regulates and authorizes permits for the removal of abandoned underground storage tanks. 2. Agriculture. Agricultural uses, defined as commercial farming and animal husbandry. 3. Land Disturbing Activities. Activities that substantially divert, alter, or reduce the flow of ground or surface waters, or otherwise adversely affect aquifer recharge. 15.22.310 Critical area report additional requirements. A. For all regulated activities, the applicant must submit a report describing the best management practices to be used to minimize the risk of aquifer contamination. In addition to the minimum report requirements pursuant to PAMC 15.22.120, a critical area report for any regulated activity within a critical aquifer recharge area must contain the following: 1. A hydrogeologic assessment including, but not limited to, the following: a. Available information regarding geologic and hydrogeologic characteristics of the site, including the surface location of all critical aquifer recharge areas located on site or immediately adjacent to the site, and permeability of the unsaturated zone; b. Groundwater depth, flow direction, and gradient based on available information; c. Available well logs, borings, seeps/springs within 1,000 feet of the project area; d. Available ground and surface water quality data; e. Best management practices proposed to be used; f. Groundwater monitoring plan provisions; g. Discussion of the effects of the proposed project on groundwater quality and quantity, including predictive evaluation of groundwater withdrawal effects on nearby wells and surface water features and predictive evaluation of contaminant transport based on potential releases to groundwater h. A spill plan that identifies equipment and/or structures that could fail, resulting in an impact. Spill plans must include provisions for regular inspection, repair, replacement of structures and equipment that could fail, cleanup and disposal of all materials spilled; and i. Description of potential mitigation measures, including any sampling schedules necessary should it be determined that the proposed project may have an adverse impact on groundwater resources. 2. If the hydrogeologic assessment determines that the facility will have no effect on groundwater resources, the facility is exempt from the development standards as described in PAMC 15.22.320. 3. If the hydrogeologic assessment determined that the facility could have an effect on groundwater resources, the decision-maker will require implementation of applicable development standards in PAMC 15.22.320. September 23, 2026 Planning Commission Regular Meeting 48 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 15.22.320 Protection and development standards for regulated activities. A. The following protection and development standards apply to the regulated activities and facilities in areas designated as critical aquifer recharge areas. 1. Aboveground/Underground Storage Tanks or Vaults. Aboveground/underground storage tanks or vaults for the storage of hazardous substances, animal wastes, sewage sludge, fertilizers, or other chemical or biological hazards or dangerous wastes as defined in Chapter 173-303 WAC, or any other substances, solids, or liquids in quantities identified by the Clallam County Environmental Health Division, consistent with Chapter 173-303, as a risk to groundwater quality, must be designed and constructed so as to: a. Prevent the release of such substances to the ground, ground waters, or surface waters; b. Have constructed around and under it, an impervious containment area enclosing or underlying the tank or part thereof. Impervious containment shall be greater than the volume of the storage area to avoid an overflow of the containment area; c. Provide for release detection; d. Provide written spill response and spill notification procedures to the Stormwater Division of the Port Angeles Public Works & Utilities Department; e. Use material in the construction or lining of the storage containment area which is compatible with the substance to be stored to protect against corrosion or leakage or otherwise designed in a manner to prevent the release or threatened release of any stored substance; and f. Comply with Chapters 173-303 and 173-360 WAC. 2. Agriculture. New agriculture or hobby farms must use best management practices concerning animal husbandry, animal waste disposal, fertilizer use, pesticide use, and wastewater applications. It is highly recommended that farm owners and operators seek the technical assistance of the Clallam County Conservation District for the development of Farm Management Plans. 3. Land disturbing activities. All ground disturbing activities likely to substantially divert, alter, or reduce the flow of ground or surface waters, or otherwise adversely affect aquifer recharge must implement best management practices (BMPs) for groundwater protection, consistent with Chapter 13.63, PAMC. a. Stormwater infiltration must comply with Chapter 13.63 PAMC and the most recent update or version of the Department of Ecology’s Stormwater Management Manual for Western Washington. B. Prohibited uses. The following uses and activities for new development or redevelopment are prohibited within or adjacent to Critical Aquifer Recharge Areas, unless otherwise approved through a hydrogeologic assessment demonstrating no adverse impact: 1. Landfills or transfer stations; 2. Hazardous material disposal sites; 3. Outdoor wood preservation operations; 4. Manufacturing, processing, packaging, or storage of hazardous materials. September 23, 2026 Planning Commission Regular Meeting 49 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE V. FREQUENTLY FLOODED AREAS 15.22.330 Purpose. A. Frequently flooded areas include floodplains and other areas subject to flooding that perform important hydrologic functions and may present a risk to people and property. They include, but are not limited to, the 100-year floodplain designations of the Federal Emergency Management Act (FEMA), and the National Flood Insurance Program (NFIP), known as “special flood hazard areas” which are regulated under PAMC Chapter 15.12 – Flood Damage Prevention. B. The purpose of this article is to protect the ecological functions and values of floodplains while protecting buildings, infrastructure, and people from flood risk. 15.22.340 Designation. A. Special Flood Hazard Areas. Frequently flooded areas include those areas established as special flood hazard areas under PAMC Chapter 15.12, Flood Damage Prevention, including those areas of special flood hazard identified by the Federal Insurance Administrator in a scientific and engineering report entitled “The Flood Insurance Study (FIS) for Clallam County, WA and incorporated areas”, dated April 23, 2025, and any revisions thereto, with accompanying Flood Insurance Rate Maps (FIRMs) dated April 23, 2025, and any revisions thereto. The best available information for flood hazard area identification as outlined in PAMC Chapter 15.12, Flood Damage Prevention, is the basis for regulation until a new FIRM is issued that incorporates the data utilized under PAMC Chapter 15.12, Flood Damage Prevention. B. Channel Migration Zones. Channel migration zones (CMZs) are areas in a floodplain where a stream or river channel can be expected to move naturally over time in response to gravity and topography. Development situated away from CMZs helps reduce flood and erosion hazards and costly repairs to infrastructure while preventing loss of crucial floodplain habitat. This area is designated using the method established by Rapp and Abbe that defines the CMZ as a composition of the following zones: 1. Historical migration zone. The Historical Migration Zone is the area the stream channel has occupied over the time period spanning the historical record as established through historical maps and aerials. 2. Avulsion hazard zone. The Avulsion Hazard Zone is an area deemed susceptible to avulsion of the main stem channel. Avulsions are abrupt switches in channel course than can have catastrophic consequences for existing floodplain development. Avulsion Hazard Zones may include low-lying floodplain areas capable of capturing main stem flows, and areas between channel bends prone to avulsions that cutoff meander bends. 3. Erosion hazard zone. The Erosion Hazard Zone is an area outside of the Historic Migration Zone that has a reasonable likelihood to be influenced by channel migration over the design life of the CMZ. A CMZ’s Erosion Hazard Zone often extends outside and above the FEMA flood zones along actively migrating streams. 15.22.350 Mapping A. Reference Only. The maps and resources cited in this article are to be used as a guide for the City of Port Angeles Staff, project applicants, and/or property owners, and may be continuously updated as new critical areas are identified. They are a reference and do not provide a final critical area designation. The current FIRMs are filed at the office of the City Clerk, 321 East 5th Street, Port Angeles, WA 98362 and with the City’s GIS Division. 15.22.360 General development standards. A. All development proposals in frequently flooded areas must comply with PAMC Chapter 15.12, Flood Damage Prevention, for general and specific flood hazard protection. September 23, 2026 Planning Commission Regular Meeting 50 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 B. Base flood data and flood hazard notes must be shown the face of any recorded plat or binding site plan, including, but not limited to, base flood elevations, flood protection elevation, boundary of floodplain, and zero rise floodway. C. All development must conform to the provisions of the currently adopted International Building Code, including submittal of a critical area report. D. Development may not reduce the base flood water storage ability. Construction, grading, or other regulated activities that would reduce the flood water storage ability must be mitigated by creating compensatory storage on or off site. 15.22.370 Critical area report additional requirements. A. In addition to the minimum report contents required per PAMC 15.22.110, Critical area report, and PAMC 15.22.120, Minimum report requirements, any development proposal in a frequently flooded area must also contain the report requirements per PAMC 15.12.120.B. B. Habitat Assessment Required. Unless otherwise exempted, the critical area report must contain a habitat assessment prepared in accordance with the Regional Guidance for Floodplain Habitat Assessment and Mitigation (FEMA Region 10, 2013), or as hereafter amended. The habitat assessment is needed to identify the impact of the proposed development on existing floodplain and instream habitat functions and processes, and must contain, at a minimum, the following elements: 1. A description of the project area, including a map. 2. A description of the project area’s habitat including: a. Background research; b. Protected species identification; c. Site investigation; d. Habitat narrative; and e. Habitat area map. 3. A description of the project including the goal of the final project, construction processes and BMPs, and protection measures. 4. An assessment of the direct and indirect impacts of the action on any ESA-listed species and their aquatic, riparian, and floodplain habitat areas identified in the description of the project area’s habitat, as well as the cumulative effects of future actions that are reasonably certain to occur. Direct effects must be considered for the following: a. First primary constituent element, such as freshwater spawning sites; b. Second primary constituent element, such as freshwater rearing sites; c. Third primary constituent element, such as freshwater migration corridors; d. Essential Fish Habitat designated by the National Marine Fisheries Service; e. Fish and wildlife habitat conservation areas; f. Vegetation communities and habitat structures; g. Water quality; h. Water quantity, including flood and low flow depths, volumes and velocities; i. The channel’s planform pattern and migration processes; j. Spawning substrate, if applicable; and/or September 23, 2026 Planning Commission Regular Meeting 51 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 k. Floodplain refugia, if applicable. 5. The effects determination criteria must be consistent with that of the National Marine Fisheries Service, US Fish and Wildlife Service, and the US Army Corps of Engineers: 1. No effect (NE). The project has no effect, whatsoever, to the listed species or designated critical habitat. 2. May Affect, Not Likely to Adversely Affect (NLAA). Any negative effects to the listed species or designated critical habitat are insignificant and/or discountable. A determination of NLAA would also be made for those activities that have only a beneficial effect with no short- or long-term adverse effects. If the effects determination is NLAA, the report should indicate what steps were taken to avoid and minimize any negative project impacts and include a mitigation plan consistent with the guidance provided in the Habitat Assessment and Mitigation document referenced above. 3. Likely to Adversely Affect (LAA). The effects of the project will result in short- or long-term adverse effects on the identified species or designated habitat area. The assessment must include a mitigation plan consistent with the guidance provided in the Habitat Assessment and Mitigation document referenced above. 6. No short- or long-term effects to ESA-listed species or their designated critical habitats are allowed to occur within the Protection Area as established in the Regional Guidance for Floodplain Habitat Assessment and Mitigation, FEMA Region X, 2013. As such, avoidance is the only viable mitigation option. Outside of the Protected Area, any adverse effect must be fully mitigated to the extent practicable, and the proponent must demonstrate how each of the measures within the mitigation sequence will be used. C. Exemptions. The following activities are exempt from the habitat assessment requirements established above: 1. Repair of existing buildings or structures located entirely within the existing footprint, including damage by fire or other natural disasters unless the repair constitutes substantial improvement or is necessitated by substantial damage; 2. Removal of noxious weeds; 3. Replacement of non-native vegetation with native vegetation; 4. Ongoing maintenance activities such as lawn and garden maintenance of lawfully established landscaped areas; 5. Removal of high-risk hazard trees, unless the tree provides critical habitat, such as an eagle perch or occupied nest; 6. Normal maintenance of public utilities and facilities; 7. Restoration or enhancement of floodplains, riparian areas, and streams that meet federal and state standards. ARTICLE VI. GEOLOGICALLY HAZARDOUS AREAS 15.22.380 Purpose. A. Geologically hazardous areas are areas that because of their susceptibility to erosion, sliding, earthquake, or other geological events, are not suited to siting commercial, residential, or industrial development consistent with public health or safety concerns. It is the purpose of this article is to reduce the risk of damage to structures and property from geologic hazards, to allow for natural geologic processes supportive of forming September 23, 2026 Planning Commission Regular Meeting 52 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 and maintaining fish and wildlife habitat, and to regulate and inform land use and planning decisions. It is recognized that the elimination of all risk from geologic hazards is not feasible to achieve, but the purpose of this article is to reduce the risk to acceptable levels. B. Special consideration will be given to climate change risks associated with geologically hazardous areas including flooding, sea level rise, and mass wasting/slope failures throughout this article. 15.22.390 Designation. A. The following areas situated within the City of Port Angeles are hereby established as geologically hazardous areas and are subject to the provisions of this chapter: 1. Erosion Hazard Areas. Erosion hazard areas are those areas containing soils which, according to the United States Department of Agriculture Natural Resources Conservation Service (NRCS) Soil Survey Program, may experience significant erosion. They also include coastal erosion-prone areas, channel migration zones, bluffs, steep slopes, and areas with unconsolidated soils. 2. Landslide Hazard Areas. Landslide hazard areas are areas at risk of mass movement due to a combination of geologic, topographic, and hydrologic factors. They include any areas susceptible to landslide because of any combination of bedrock, soil, slope, slope aspect, structure, hydrology, or other factors, and include, at a minimum, the following: a. Areas of historic failures, such as: i. Those areas delineated by the USDA NRCS as having a significant limitation for building site development; ii. Those coastal areas mapped as class u (unstable), uos (unstable old slides), and urs (unstable recent slides) in the department of ecology Washington Coastal Atlas; or iii. Areas designated as quaternary slumps, earthflows, mudflows, lahars, or landslides on maps published by the United States Geological Survey or Washington Department of Natural Resources. b. Areas with all three of the following characteristics: i. Slopes steeper than 15 percent; ii. Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively impermeable sediment or bedrock; and iii. Springs or groundwater seepage. c. Areas that have shown movement from 10,000 years ago to the present, or which are underlain or covered by mass wastage debris of this epoch; d. Slopes that are parallel or subparallel to planes of weakness in subsurface materials; e. Slopes having gradients steeper than 80 percent subject to rockfall during seismic shaking; f. Areas potentially unstable as a result of rapid stream incision, stream bank erosion, and undercutting by wave action, including stream channel migration zones; g. Areas that show evidence of, or are at risk from snow avalanches; h. Areas located in a canyon or on an active alluvial fan, presently or potentially subject to inundation by debris flows or catastrophic flooding; and i. Any area with a slope of 40 percent or steeper and with a vertical relief of 10 or more feet except areas composed of bedrock. A slope is delineated by establishing its toe and top and measured by averaging the inclination over at least 10 feet of vertical relief. September 23, 2026 Planning Commission Regular Meeting 53 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 3. Seismic hazard areas. Seismic hazard areas are areas subject to severe risk of damage as a result of earthquake induced ground shaking, slope failure, settlement or subsidence, soil liquefaction, surface faulting, debris flows, lahars, or tsunamis. 4. Tsunami hazard areas. Tsunami hazard areas include coastal areas and riverine shoreline areas susceptible to flooding, inundation, debris impact, and/or mass wasting as the result of coastal wave action generated by seismic events or other geologic events. 15.22.400 Mapping. A. The approximate location and extent of known potential geologically hazardous areas are shown on maps maintained by the City. The following resources provide information on the approximate location and extent of geologically hazardous areas and are hereby adopted by reference as amended: 1. Clallam County, Geohazards CCC 27.12.410; 2. Washington Department of Ecology, Coastal Zone Atlas; 3. U.S. Geological Survey geologic maps, landslide hazard maps, and seismic hazard maps; 4. Washington Department of Natural Resources Geologic Information Portal maps, including but not limited to landslides, tsunamis, earthquakes, and soil stability; and 5. USDA Natural Resources Conservation Service Web Soil Survey maps. B. Reference only. The maps and resources cited above are to be used as a guide for the City of Port Angeles Staff, project applicants, and/or property owners and may be continuously updated as new critical areas are identified. They are a reference and do not provide a final critical area designation. 15.22.410 General Development Standards. A. All development activities and uses are prohibited in geologically hazardous areas and their buffers, except as otherwise provided in this chapter under PAMC 15.22.070, Exempt Activities, 15.22.080, Allowed uses or activities, and 15.22.090, Permitted uses or activities. B. Approvals. New development proposals must be located and/or engineered and constructed to reduce risks to life, health, safety, and buildings, and not increase potential for landslides or erosion that could impact either other properties, public resources, or other critical areas. The City may impose conditions on development activity in a geologically hazardous area as needed to: 1. Protect human life and safety; 2. Minimize the potential for property damage related to seismic events, erosion and/or landslides; 3. Minimize the need for stream or riverbank coastal bluff stabilization in the future; 4. Reduce public liabilities for damages associated with geologic hazards; 5. Protect slope stability and minimize erosion, seismic, and/or landslide hazard risks; 6. Maintain natural sediment and erosion processes that are integral to the health and sustainability of freshwater and marine ecosystems as well as minimizing impacts to stream, river, and coastal processes such as channel infill, channel migration, sediment transport, or flooding. C. Impact Avoidance. Impact avoidance measures must include, but not be limited to, locating the use/development outside of the hazard area, reducing the number, size, or scale of buildings and appurtenant features; altering the configuration or layout of the proposed development; implementing special engineering methods for construction, drainage, and stormwater runoff management; preserving native vegetation, and other feasible protective measures. D. Viewshed enhancement. In landslide and erosion hazard areas, the Director may approve alterations in vegetation coverage for the purposes of viewshed enhancement, so long as such alterations will not: September 23, 2026 Planning Commission Regular Meeting 54 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 1. Increase geological hazards such as erosion potential, landslide potential, or seismic hazard potential, as demonstrated by a qualified professional; 2. Adversely affect fish and wildlife habitat conservation areas, including cumulative impacts to the functions and values of these areas; 3. Remove with appropriate pruning practices more than 25 percent of the live crown of a tree over any five-year period. Pruning must be in support of maintaining tree health and vigor and be in accordance with ANSI tree pruning practices. Tree topping is not an acceptable pruning practice; however, reduction may be utilized on deciduous trees only when approved by an ISA Certified Arborist as an acceptable practice. Window pruning is the preferred pruning method when feasible. 4. Include felling, topping, or removal of trees. If a violation of this subsection should occur, the landowner must replace any trees that are felled, topped, or removed with new trees at a ratio of 2:1 within one year of the action in accordance with an approved restoration plan. Tree species that are native to the site with a preference for drought tolerant species must be used. At least one of the replacement trees must be evergreen. 15.22.420 Specific Development Standards. A. Erosion or Landslide Hazards Areas. Areas containing or adjacent to erosion or landslide hazard areas may be altered only when the Director concludes, based on environmental information provided by a qualified professional, the following criteria are met in addition to the general development standards established in PAMC 15.22.410: 1. The proposed alteration includes all appropriate measures to avoid, eliminate, reduce, or otherwise mitigate risks to health and safety. 2. The proposed alteration is outside of an erosion or landslide hazard area and any required buffers as set forth in subsection B of this section. 3. The removal and disturbance of vegetation, clearing, or grading will be limited to the area of the approved development, and will otherwise not be disturbed. 4. The development is outside of the area of potential upslope or downslope surface movement or potential deposition in the event of slope failure. 5. The development will not increase or concentrate stormwater discharge or sedimentation to adjacent properties beyond predevelopment conditions. 6. The development will not decrease slope stability on adjacent properties or increase the risk or frequency of landslide occurrences. 7. The proposed alterations will not adversely impact other critical areas. 8. Structures and improvements will minimize alterations to the slope contour, and will be designed to minimize impervious lot coverage unless such alterations or impervious surfaces are needed to maintain slope stability. 9. Upon permit issuance, the property owner must sign and record a notice on title, at the owner’s sole expense, a covenant in a form acceptable to the City, which: a. Acknowledges and accepts the risks of the development in the landslide hazard area; b. Waives any rights to claims against the City; c. Indemnifies and holds harmless the City against claims, losses, and damages; and d. Informs subsequent owners of the property of the risks and the covenant. B. Erosion or landslide hazard area buffers. Buffers of undisturbed vegetation will be required from the top, toe, and edges of any identified erosion or landslide hazard area in accordance with the following: September 23, 2026 Planning Commission Regular Meeting 55 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 1. A minimum buffer of fifty (50) feet is established from the top, toe, and edges of erosion or landslide hazard areas for new developments, except as otherwise allowed under this subsection. The buffer may not be altered except by a general exemption, variance, or reasonable use exception approval, as authorized by this chapter; provided that such alterations meet all other standards for the protection of fish and wildlife habitat conservation areas. 2. Development proposals on sites that are directly adjacent to a wetland, marine shoreline, or other fish and wildlife habitat conservation area may be subject to additional buffer requirements and standards as set forth in the subsequent articles of this chapter. C. Buffer reduction. The buffer may be reduced by a maximum of 25 percent when a qualified professional is able to demonstrate to the satisfaction of the Director that the proposed development setback will: 1. Not adversely impact the stability of the erosion or landslide hazard area; 2. Not increase erosion and mass movement potential of the landslide hazard area; 3. Use construction techniques that minimize disruption of the existing topography and vegetation; 4. Include measures to overcome any geological, soils, and hydrological constraints of the site; 5. Not adversely impact other critical areas; and 6. Through design and engineering solutions, provide protection to the proposed development and adjacent properties equal to that of the standard buffer. D. Increased buffer. The standard buffer may be increased by the decision-maker based on the critical area report by a qualified professional that indicates a greater buffer is necessary to protect the proposed development and/or adjacent properties. E. Seasonal restriction. Clearing within an erosion or landslide hazard area or buffer may be allowed only from May 1st to October 1st of each year; provided, that the decision-maker may extend or shorten the dry season on a case-by-case basis depending on actual weather conditions and other factors deemed relevant. F. Stormwater management. Prior to any development activity, a plan for collection, transport, treatment and discharge of stormwater in accordance with the requirements of PAMC Chapter 13.63, or as amended, and in accordance with the current adopted Stormwater Management Manual for Western Washington. 15.22.430 Critical Area Report Additional Requirements. A. When City Critical Area Maps or other sources of credible information indicate that a site proposed for development or alteration is, or may be, located within an active or potentially geologically hazardous area, the Director will have the authority to require the submittal of a geological assessment report. B. Geologic Hazards Assessment. A geologic hazards assessment report for a geologically hazardous area must include a field investigation and contain an assessment of whether or not the type of potential geologic hazard identified is present or not present and if development of the site will increase the potential for landslides or erosion on or off the site. Geology hazards assessment reports must be prepared, stamped, and signed by a qualified professional. The report should: 1. Be appropriate for the scale and scope of the project; 2. Include a discussion of all geologically hazardous areas on the site and any geologically hazardous areas off site potentially impacted by or which could impact the proposed project. If the affected area extends beyond the subject property, the geology hazard assessment may utilize existing data sources pertaining to that area; September 23, 2026 Planning Commission Regular Meeting 56 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 3. Clearly state that the proposed project will not decrease slope stability or pose an unreasonable threat to persons or property either on or off site and provide a rationale as to those conclusions based on geologic conditions and interpretations specific to the project; 4. Provide a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, and other adequate information to determine compliance with the requirements of this article; 5. Provide conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties; 6. Geotechnical reports must conform to accepted technical standards and generally follow the guidelines set forth in the Washington State Department of Licensing Guidelines for Preparing Engineering Geology Reports in Washington (2006). In some cases, such as when it is determined that no landslide or erosion risk is present, a full report may not be necessary to determine compliance with this article, and in those cases a stamped letter or abbreviated report may be provided; 7. If a landslide or erosion hazard is identified, provide a recommendation for the minimum no- disturbance buffer and minimum building setback for avoiding the landslide or erosion hazard, based upon the geotechnical analysis; 8. For projects in seismic hazard areas, the report must also include a detailed engineering evaluation of expected ground displacements, amplified seismic shaking, or other liquefaction and/or dynamic settlement effects and proposed mitigation measures to ensure an acceptable level of risk for the proposed structure type or other development facilities such as access roads and utilities. C. Duration. A geological assessment or report for a specific site may be valid for a period of up to five years when the proposed land use activity and site conditions affecting the site are unchanged. However, if any surface and subsurface conditions associated with the site change during that five-year period, the applicant may be required to submit an amendment to the original geological assessment or report. ARTICLE VII. FISH AND WILDLIFE HABITAT CONSERVATION AREAS 15.22.440 Purpose. A. The purposes of this article are to: 1. Ensure sufficient habitat quality, quantity, and connectivity to support long-term, viable populations of fish and wildlife species; 2. Prevent the creation of isolated subpopulations within their natural geographic distribution through development regulation to avoid habitat degradation and minimize fragmentation; 3. Protect, restore, and maintain native fish and wildlife populations by protecting and conserving fish and wildlife habitat through the protection and enhancement of the ecological processes, functions and values, and biodiversity that sustain these resources; 4. Protect marine shorelines, valuable terrestrial habitats, streams and their associated riparian areas, and the ecosystem processes on which these areas depend. 15.22.450 Designation. A. Fish and Wildlife Habitat Conservation Areas (FWHCAs) are those areas identified as being of critical importance to the maintenance of certain fish, wildlife, and/or plant species populations. These areas are typically identified either by known point locations of specific species or by habitat areas, or both. All areas September 23, 2026 Planning Commission Regular Meeting 57 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 within the City meeting these criteria are hereby designated critical areas and are subject to the provisions of this article. Habitat conservation areas include all of the following: 1. Areas where endangered, threatened, and sensitive species have a primary association as indicated in the U.S . Fish and Wildlife’s Threatened and Endangered Species List of Critical Habitat List, the National Marine Fisheries Service, or the Washington Department of Fish and Wildlife’s Priority Habitats and Species List, as amended; 2. Commercial and recreational shellfish areas; 3. Kelp and eelgrass beds; herring, smelt, and other forage fish spawning areas as identified by the Washington State Department of Natural Resources and the Department of Ecology; 4. Naturally occurring ponds under 20 acres and their submerged aquatic beds that provide fish or wildlife habitat. These do not include ponds deliberately designed and created from dry sites, such as canals, detention facilities, wastewater treatment facilities, farm ponds, temporary construction ponds, and landscape amenities; 5. Waters of the state as defined in RCW 90.48.020 to include lakes, rivers, ponds, streams, inland waters, underground waters, salt waters, and all other surface waters and watercourses in Washington; 6. Lakes, ponds, streams, and rivers planted with game fish by a government or tribal entity; 7. State natural area preserves, natural resource conservation areas, and state wildlife areas; and 8. Species and habitats of local importance as determined by the City. Locally important species and habitats have recreational, cultural, and/or economic values to the community. 15.22.460 Mapping. A. The approximate location and extent of identified fish, wildlife, and sensitive plant habitat areas are shown on the City’s critical area maps as well as state and federal maps and are for reference only. A location- specific assessment is necessary to determine the extent of the potential Habitat Conservation Area when a proposed use or activity is likely to contain a FWHCA. B. The following maps and inventories are hereby adopted by reference, as amended: 1. U.S. Fish and Wildlife Service 2. National Oceanic and Atmospheric Administration Fisheries Northwest Region Critical Habitat Mapper; 3. Washington Department of Fish and Wildlife Priority Habitats and Species maps; 4. Washington Department of Natural Resources Natural Heritage Program mapping data; 5. Washington Department of Natural Resources State Natural Area Preserves and Natural Resource Conservation Area maps; 15.22.470 General development standards for all FWHCAs. A. All new development use and activity proposals are prohibited from fish and wildlife conservation areas and their buffers except in accordance with this chapter, with the exception of those areas in the shoreline jurisdiction that are hereby regulated under PAMC 15.08, Shoreline Management. Alteration of FWHCAs or their buffers is prohibited except as otherwise allowed by this Chapter and may occur only if the proposed alteration of the habitat and any associated mitigation proposed does not degrade the ecological functions and values of the habitat. B. Exemptions. Exemptions from this article are listed in the provisions established in PAMC 15.22.070. All other uses and activities are regulated under this chapter. C. Approvals and best available science. Any approval of alterations or impacts to a FWHCA must be supported by the best available science as described in the required critical area report. The decision-maker may September 23, 2026 Planning Commission Regular Meeting 58 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 condition approval of activities allowed within or adjacent to a FWHCA or its buffer as necessary to minimize or mitigate any potential adverse impacts and may include, but not be limited to, the following: 1. Establishment of buffer zones and building setbacks. Buffers must consist of an undisturbed area of native vegetation or areas identified for restoration or creation to protect the integrity, functions, and values of the affected habitat. Required buffer widths will reflect the sensitivity of the habitat and the type and intensity of the proposed activity; 2. Preservation or restoration of critically important vegetation and/or habitat features such as snags and downed large woody debris; 3. Preservation or enhancement of contiguous wildlife habitat corridors, to minimize fragmentation; 4. Limitation of access to the habitat area, including fencing or signage to deter unauthorized access, provided the fencing does not prohibit wildlife movement through the area; 5. Seasonal restriction of construction activities; 6. Establishment of a duration and timetable for periodic review of mitigation activities, if not already established in the mitigation plan; and 7. Requirement of a performance bond, when necessary, to ensure completion and success of proposed mitigation. D. Non-native species. No plant, wildlife, or fish species not indigenous to the region may be introduced into a FWHCA unless authorized by a state or federal permit or approval. E. Seasonal restrictions. When a species is more susceptible to adverse impacts during specific periods of the year, seasonal restrictions may apply. Larger buffers may be required and activities may be further restricted during the specified season for the applicable species. F. Subdivisions. The subdivision and short subdivision of land in FWHCAs and associated buffers is subject to the following: 1. Land that is located wholly within a FWHCA or its buffer may not be subdivided; 2. Land that is located partially within a FWHCA may be subdivided only if an accessible and contiguous portion of each new lot that meets the minimum lot size requirements for the zone is located outside of the FWHCA and its buffer; 3. Access roads and utilities serving a proposed subdivision may be permitted within the FWHCA and associated buffer only if the applicant’s qualified professional demonstrates, and the decision-maker determines, that no other feasible alternative exists, all unavoidable impacts are fully mitigated, and the use is consistent with this chapter; and 4. This subsection does not authorize new access roads and utilities in FWHCAs and associated buffers for existing subdivisions. G. Mitigation and Continuous Corridors. Mitigation sites must be located to preserve or achieve contiguous wildlife habitat corridors in accordance with a mitigation plan that is part of an approved critical area report to minimize the isolating effects of development on habitat areas and reduce fragmentation, so long as mitigation of aquatic habitat is located within the same aquatic ecosystem as the disturbed area. H. Mitigation and equivalent or greater biological functions. Mitigation for alterations to FWHCAs must achieve equivalent or greater biologic and hydrologic functions and must include mitigation for any adverse impacts up- or downstream of the project site. September 23, 2026 Planning Commission Regular Meeting 59 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 15.22.480 Specific standards for riparian management zones. A. The Washington Department of Fish and Wildlife recognizes riparian ecosystems as a Priority Habitat for fish and wildlife. This area provides full ecological function for bank stability, shade, pollution removal, contributions of detrital nutrients, and recruitment of large woody debris. The City of Port Angeles hereby designates the riparian management zone (RMZ) as the location where protection and restoration of riparian ecosystem functions and values are addressed. B. Designation of the RMZ. The riparian management zone encompasses the riparian ecosystem and the channel migration zone to account for lateral movement of the riparian ecosystem over time. RMZs can also provide habitat for many terrestrial wildlife species and act as an important wildlife corridor. 1. The width of the RMZ is determined by the Site Potential Tree Height (SPTH200), which is the average maximum height of the tallest dominant tree for a given site class, or 100 feet, whichever is greater, measured horizontally. The RMZ is measured from whichever of the following features is furthest from the center of the watercourse: a. The ordinary high-water mark; b. The top of the stream bank; or c. The outer edge of the channel migration zone (if one exists). 2. Uses or activities that may impact an RMZ must provide a critical areas report prepared by a qualified professional describing the functions and values of the RMZ. The report must include the SPTH200 as determined by WDFW. If SPTH200 is calculated using site-scale data, that information must be included in the report, and clearly identify what inner measurement point was used and the extent of the RMZ with sufficient detail for field verification. The report must demonstrate that the project will result in no net loss of the ecological functions and values for the RMZ and associated species. C. Development standard for parcels containing an RMZ. Unless otherwise allowed in this chapter, all clearing, grading, new structures, or storage of materials and activities must be located outside of the RMZ, as defined in subsection B of this section. The following development standards apply for all parcels containing an RMZ: 1. In locations where an on-site sewage system is determined to be necessary, the system must be located outside of the RMZ; 2. New development that would require bank protection and/or hardening is prohibited, unless it addresses an imminent threat as an emergency activity. Consideration must be given to soft armoring prior to proposing hard armoring with any development proposal. 3. Due to the negative impact on RMZs, clearing, grading, and filling activities that cannot be located outside of the RMZ must limit disturbance and minimize effects to the greatest extent possible. Adequate mitigation must be demonstrated in the HMP pursuant to PAMC section 15.22.510.B. 4. Any action detrimental to habitat and any action affecting trees or vegetation, including but not limited to clearing or removal, are prohibited except as provided in PAMC 15.22.080. 5. If the RMZ is degraded due to the lack of trees or other native vegetation, the presence of invasive or nonnative species, and/or the presence of impervious surface or other development, the applicant must prepare and carry out a restoration plan that restores the ecological function of the RMZ to the extent commensurate with the impact of the development on the RMZ, and according to mitigation standards pursuant to PAMC 15.22.130 and 15.22.140. D. Piped watercourses and roadside ditches. The City recognizes that within the urban environment, many historical streams have been substantially modified to accommodate development, prior to the establishment of these regulations. Several of the regulated and mapped watercourses within the City of Port Angeles pass through natural reaches, modified reaches, piped reaches, and on occasion, along manmade roadside ditches. September 23, 2026 Planning Commission Regular Meeting 60 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 1. Development along piped watercourses and ditches that do not meet the definition of a watercourse are subject to a 10-foot setback from the centerline of the pipes watercourse or ditch and are subject to the recording of a utility easement granted to the city for access and maintenance of the watercourse infrastructure. 2. The voluntary opening/daylighting and restoration or rehabilitation of a previously channelized, culverted, or piped watercourse is highly encouraged and may be approved by the decision-maker when the following is demonstrated in the critical area report: a. The restoration will result in a net gain in FWHCA functions, including an improvement in water quality, water storage capacity, and overall ecological functions; b. Opened channels must be designed to support fish and wildlife habitat and uninhibited fish access, unless demonstrated to be infeasible; c. A reduction to the standard RMZ is allowed to a minimum of 25 feet, or as recommended by a qualified professional in the critical area report; d. The proposal will not significantly increase the threat of erosion, flooding, slope stability, or other natural hazards on the site or adjacent properties; e. The proposal must demonstrate that the conveyance will maintain the flow capacity and not create flooding elsewhere in the drainage basin; f. The watercourse formerly in the pipe or culvert will be regulated as an RMZ, except for situations when the pipe or culvert was removed to provide for a publicly owned facility designed primarily for water quality treatment, flow control, or stormwater conveyance. E. Enhancement measures. Only those enhancement measures deemed most applicable and/or appropriate for RMZ enhancement projects will be considered in an EMZ modification proposal, and must be supported by best available science in the critical area report. These include, but are not limited to; 1. Removal of fish barriers to restore accessibility to fish; 2. Enhancement of fish habitat using large woody debris incorporated as part of a fish habitat enhancement plan; 3. Enhancement of fish and wildlife habitat structure that are likely to be used by wildlife, including wood duck houses, bat boxes, nesting platforms, the creation or retention of snags, rootwads/stumps, birdhouses, and heron nesting areas; 4. Planting native vegetation within the buffer area, especially vegetation that will increase value for fish and wildlife habitat, increase stream bank or slope stability, improve water quality and quantity, or provide aesthetic or recreational value; 5. Removal of invasive species and replacement with native vegetation consistent with best management practices for minimizing impacts to fish, wildlife, and their habitats, such as the use of hand tools or light equipment, use of aquatic herbicides and adjuvants regulated by the USDA and approved by the Department of Ecology, and minimizing soil compaction and erosion; 6. Creation of a surface channel where a watercourse was previously underground, in a culvert or pipe. Surface channels to be “daylighted” must be located in an RMZ and must be designed with energy dissipating functions or channel roughness features such as meanders and engineered log jams to reduce future bank failures and nearby flooding; 7. Removal or modification of existing stream culverts, such as road crossings, to improve fish passage, stream habitat, and flow capacities; or 8. Upgrading of retention/detention facilities or other stormwater management facilities beyond required levels. September 23, 2026 Planning Commission Regular Meeting 61 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 15.22.490 Specific standards for all other FWHCAs. A. Endangered, threatened, and sensitive species. FWHCAs or buffers that have a primary association for state or federally endangered, threatened, or sensitive species or anadromous fish species are subject to the following: 1. No development is allowed within a FWHCA or buffer with which state or federally listed endangered, threatened, or sensitive species have a primary association, except that which is provided for by a management plan established by the Washington Department of Fish and Wildlife or applicable state or federal agency. 2. Whenever activities are proposed adjacent to a FWHCA with which state or federally endangered, threatened, or sensitive species have primary association, such areas must be protected through the application of protection measures in accordance with a critical area report prepared by a qualified professional and approved by the city. Alteration of the FWHCA or its buffer may not occur prior to consultation with the Washington Department of Fish and Wildlife, the Washington Department of Natural Resources, or other appropriate federal or state agencies. 3. In kelp and eelgrass protection zones as established by the Washington Department of Fish and Wildlife, no-anchor zones must be established. B. Other priority habitats and species. Fish and wildlife habitat conservation areas or buffers with species that are not state or federally listed as endangered, threatened, or sensitive species, and are not anadromous fish species are subject to the following: 1. Development activities and uses that result in unavoidable impacts are prohibited except as otherwise allowed by this chapter and may occur in priority species habitat areas and associated buffers only if the proposed alteration does not degrade the functions and values of the habitat in accordance with an approved critical area report with a habitat assessment/management plan, and only if the proposed activity is the only reasonable alternative that will accomplish the applicant’s objectives. Full compensation for the loss of acreage and functions of habitat and buffer areas must be provided in compliance with the mitigation performance standards and requirements of this chapter. C. Required buffer for non-RMZ FWHCAs. 1. Marine FWHCA Buffers. Buffers for all designated fish and wildlife habitats or species within marine shorelines must be regulated by Chapter 15.08 PAMC – Shoreline Management, and the current adopted version of the City’s Shoreline Master Program. 2. All other non-RMZ FWHCA buffers. Buffers from FWHCAs must be established to protect the functions and values of the critical area from the impacts of proposed adjacent activities. a. Buffer widths for FWHCAs must be based on consideration of the following factors: species- specific recommendations of the Washington Department of Fish and Wildlife; recommendations contained in a habitat management plan submitted by a qualified professional; and the nature and intensity of land uses and activities occurring on the lands adjacent to the site. Buffers must: i. Consist of an undisturbed area of native vegetation, or areas identified for restoration, sufficient to protect the integrity, functions, and values of the affected habitat; ii. Reflect the sensitivity of the habitat and the type and intensity of human activity proposed to be conducted nearby; iii. Be consistent with the applicable species-specific management recommendation provided by the Washington Department of Fish and Wildlife. b. Nesting bald eagles and their habitat. When activities are proposed adjacent to a confirmed bald eagle nest territory or communal roost, a bald eagle habitat management plan must be September 23, 2026 Planning Commission Regular Meeting 62 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 developed by a qualified professional consistent with the US Fish and Wildlife Service national bald eagle management guidelines. Activities are defined as being adjacent to managed bald eagle sites when they are within 600 feet of a nest or within one-half (1/2) mile of a shoreline foraging area. Approval of the activity must not occur prior to consultation with the state or federal agency with authority on bald eagle pairs and their nest. 15.22.500 Stormwater management facilities. A. Stormwater management facilities may not be located within stream buffers, with the following exceptions: 1. Conveyance systems may be located in stream buffers on a case-by-case basis if deemed necessary and approved by the Director of Public Works and Utilities. 2. Full dispersion of flow, as described in BMP T5.30 of the Department of Ecology's most current SWMMWW, may be allowed in a stream buffer if approved by the Director of Public Works and Utilities. 3. The facilities or methods specified in subsections A.1 and 2 of this section are allowed only if impacts to the buffer, resulting from their installation, are avoided or mitigated. 4. Stormwater management design and facilities must be consistent with PAMC Section 13.63.190, to protect the hydrology and functions of the RMZ. Native vegetation enhancement in RMZ buffers may be approved for both buffer enhancement and as part of a best management practice to meet low impact development stormwater standards required by the Washington State Department of Ecology. Any stormwater management facility or method associated with RMZs must meet the state requirements adopted in PAMC Section 13.63.190. 15.22.510 Critical area report additional requirements. In addition to the minimum report requirements of PAMC 15.22.120, critical area reports for FWHCAs must meet the requirements of this section. If a project in a FWHCA also has other designated critical areas, such as wetlands or frequently flooded areas, the critical areas report must contain all additional report requirements for each relevant critical area type. A. Prepared by a qualified professional. A critical areas report for FWHCAs must be prepared by a qualified professional biologist, botanist, or ecologist. B. Habitat Management Plan Required. If an RMZ is found to be present and/or impacted by any proposed development, a Habitat Management Plan (HMP) must be included in the critical area report, to be prepared by a qualified professional biologist, botanist, or ecologist. The HMP must address the following: 1. The extent of critical areas within and adjacent to a proposed project site identified, along with the ecosystem functions and values that need protection; 2. Identify salmonids and other priority aquatic species that use the stream network in the immediate vicinity, as well as up- and downstream from the project site; 3. Identify any other Priority Species that may use the riparian corridor and any other Priority Habitats to which the corridor is connected; 4. Include a delineation map of the RMZ with field-verified ordinary high water mark(s) to be used for updating the City’s Critical Areas Maps; 5. Describe the relevant management recommendations for Priority Habitats and Species found on or near the site; 6. Identify and quantify current proposed disturbances to the RMZ and any other FWHCAs; September 23, 2026 Planning Commission Regular Meeting 63 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 7. Include a description of the project proponent’s mitigation sequencing. If mitigation is necessary, the HMP should identify ways to improve riparian ecosystem function by enhancing riparian corridor connectivity, or by improving the quality of the riparian area; and 8. Describe requirements for monitoring and adaptive management, including identifying measurable standards and expectations to monitor compliance such as composition of riparian tree species, maximum invasive plant cover, and total extent of vegetation cover. Monitoring visits must be identified at an appropriate interval for the project and include measurable triggers for requiring further action, such as maximum percent area coverage of invasive plants. Clearly identify who is responsible for performing site visits and preparing and submitting any future reports to the City. 15.22.520 Performance standards and requirements. A. Mitigation for alterations to FWHCAs must achieve equivalent or greater biologic and hydrologic functions and must include mitigation for any adverse impacts up- or downstream of the project site, consistent with the requirements of this article and an approved Habitat Management Plan. September 23, 2026 Planning Commission Regular Meeting 64 ` MEMORANDUM DATE: Tuesday, September 22, 2026 TO: Planning Commission FROM: Planning Division RE: MCA 26-0090 Public Comment INTRODUCTION This memo and its attachment serve as the official City staff response to public comments and includes all noticing procedures and documents and individual comments and responses. It encompasses the questions from Planning Commission, City Council, Stakeholders, and Government Agencies. PUBLIC NOTICING PROCEDURES Public notice for Land Use Application MCA 26-0090 was opened on Wednesday, August 19, 2026, closed on Wednesday, September 23, 2026, and was provided in the following manner: • In the Peninsula Daily News: August 19, 2026 • At the City Hall Noticing Board: August 19, 2026 • On the City’s Website: August 19, 2026 See Attachment A for noticing documentation. PUBLIC COMMENT There were two individual written public comments received by staff during the open public comment period, in addition to the verbal comments from the public during the regularly scheduled planning commission meetings. Many of the comments received by the public related to ensuring critical areas regulations do not go above and beyond the state requirement of no-net-loss to also incorporate new ecological gain. There was a general concern over having adequate mapping available to the public upon adoption to ensure consistency with County, state, and federal mapping tools and to make navigating the areas identified as critical areas easier for local users. Additional comments were specific to viewshed enhancements and the ongoing Welcoming Vista project. September 23, 2026 Planning Commission Regular Meeting 65 MCA 26-0090 Exhibit 3 P a g e 2 |Tuesday, September 22, 2026 PLANNING COMMISSION During the regularly scheduled Planning Commission meetings from May through August, the Commissioners raised several clarifying questions related to impacts on development, housing density, comprehensive plan goals, regulatory compliance, mapping discrepancies, buffer alternatives, and potential impacts to private landowners. Attachment B contains detailed questions and responses to all planning commission questions raised during the July and August meetings. Exhibit 4 of the staff report contains questions and answers from the June 2026 meeting. CITY COUNCIL At the August 25, 2026, City Council work session, several Councilmembers had clarifying questions related to decision authority, compensatory mitigation, unauthorized uses in critical areas and enforcement of these areas, viewshed enhancement and tree management, single-source water supplies and groundwater protection, among others. All questions and comments made during this meeting have been recorded and responded to accordingly in Attachment B to this memorandum. STAKEHOLDERS The Stakeholder Advisory Group met periodically throughout the municipal code development process for technical review and guidance from local professionals. This group had clarifying questions and comments specific to definitions, consistency with the Comprehensive Plan, third-party review of applications and reports, reasonable economic use and variances, conflicting regulations, mitigation requirements and monitoring, and mapping requirements and procedures. All comments to date have been documented and responded to accordingly in Attachment B to this memorandum. GOVERNMENT AGENCIES At the time of this staff report, the draft CAO had been sent to the Department of Commerce for review by applicable government agencies. The Washington State Department of Natural Resources is the only agency to have completed their review at this time. Their comments are documented and responded to accordingly in Attachment B of this memorandum. STAFF RESPONSE Staff have addressed all relevant comments through the review process, which are documented in the Public Comment Response Matrix as Attachment B. Attachment A: Public Noticing Documentation Attachment B: Public Comment Response Matrix Attachment C: Individual Written Comments by Date Received September 23, 2026 Planning Commission Regular Meeting 66 Attachment A P U B L I C N O T I C E - Public Hearing Process for a Municipal Code Amendment 26-0090 MCA - : Municipal Code Amendment : Citywide : Critical Areas Ordinance updates are required under the Growth Management Act consistent with the periodic update of the Comprehensive Plan. Submitted Applicant Determined Complete Location Comment Period Close received by September 23, 2026. WHAT: The City of Port Angeles is working towards an update of its Critical Areas Ordinance (CAO) as a requirement of the GMA. The CAO is updated every ten (10) years to ensure the applicable development regulation meets statutory requirements. Project information may be found on the City’s website: https://www.cityofpa.us/1442/Critical-Areas- Ordinance-Updates HOW TO COMMENT: Interested parties are encouraged to comment on the proposal and may request a copy of the decision once it’s been made and any appeal rights. Written comments must be submitted prior to the close of the public hearing, care of the Department of Community & Economic Development (DCED) ced@cityofpa.us or 321 E 5th Street, Port Angeles WA 98362 c/o DCED. DATE/TIME OF HYBRID PUBLIC HEARING: Wednesday, September 23, 2026 @ 6:00 PM PST LOCATION OF HEARING: This meeting will be held as a hybrid meeting in the City Council Chambers, 321 E 5th Street, Port Angeles WA 98362. HEARING PARTICIPATION: This hearing will be held as a hybrid meeting. The Audio Only and Live Hearing function and access to City Council Chambers will be available 30 minutes prior to the meeting. If you are unable to attend the hearing, or unable to deliver audio public testimony during the public hearing as described above, you may submit written public comment. All written public testimony must be postmarked prior to September 23, 2026. LEARN ABOUT THIS LIVE MEETING: www.cityofpa.us/Live-Virtual-Meetings Toll Free Phone Number for Audio Only: 1-844-992-4726 Access Code: 255 199 9993 (*Audio Only Testimony for those without internet access: Instructions will be given during meeting) DECISION AND APPEAL INFORMATION: The City Council decision will be made based on the Staff Report, record, and written public comment. Any appeal of this decision shall be filed within 21 days after the date of decision. .............................................................................................................................................. - State Environmental Policy Act - WHAT: This action has been determined to be exempt from the State Environmental Policy Act (SEPA) per RCW 43.21C.450(1). .............................................................................................................................................. FOR ADDITIONAL INFORMATION PLEASE CONTACT: Courtney Bornsworth, Natural Resource & Grant Administrator at (360) 417-4750 or ced@cityofpa.us. September 23, 2026 Planning Commission Regular Meeting 67 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 1 of 60 Comments - Public #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 22-Jul-26 Public Commenter Verbal Comment Requested that presentation slides or handouts be made available and that agenda materials more clearly show proposed changes through redlines, highlighting, or similar formatting. 2 22-Jul-26 Public Commenter Verbal Question Asked what Department of Commerce deadline applies to the CAO update and what consequences, including potential grant impacts, could result from failure to comply. updated CAO prior to December 31, 2026. Failure to do so would result in ineligibility of future grant sources from various state agencies such as the Department of Ecology. 3 22-Jul-26 Public Commenter Verbal Comment Expressed concern that best management practices developed by professionals may reflect differing professional perspectives or biases. commonly developed by government agencies, environmental organizations and industry experts to guide sustainable and effective operations. This reduces potential bias and differing professional perspectives. 4 22-Jul-26 Public Commenter Verbal Question Asked whether mitigation plans are currently required for development affecting critical areas, whether the proposed ordinance changes those requirements, and whether plans must be prepared by a qualified professional. requirement of the existing CAO in situations where a regulated critical area is being impacted by development. The proposed changes to the regulation will not change this requirement, and the plans will still have to be prepared by a qualified professional, consistent with current regulations. 5 22-Jul-26 Public Commenter Verbal Comment Expressed concern that additional studies, mitigation requirements, or professional review may increase applicant costs and extend development-review timelines. requirements, and professional review are already existing requirements within the City's CAO. Any proposed modifications to these requirements will not further exacerbate costs associated with developing in or adjacent to critical areas or extend review timelines beyond the SB5290 requirements. Attachment B September 23, 2026 Planning Commission Regular Meeting 68 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 2 of 60 Comments - Public #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 6 22-Jul-26 Public Commenter Verbal Comment Expressed concern that the approximately 140–150-page packet was provided only a few days before the meeting, limiting the time available for meaningful review. 7 22-Jul-26 Public Commenter Verbal Question Requested clear confirmation that a property owner may remove trees located outside a critical area or buffer without triggering the proposed CAO tree-protection requirements, subject to other applicable regulations. tree removal from private property with the exception of the CAO and street trees located in the public right-of-way. Certain landscaping requirements must be met for commercial and mutli- family design standards, but more residential zones do not have existing tree removal regulations associated with them. 8 22-Jul-26 Public Commenter Verbal Question Asked how the critical-area map was developed, who or what agency is responsible for the mapped information, and what source or authority guides its use. managing the internal critical areas map based on the existing mapping tools that are managed by the applicable state or federal agency for each critical area. As agencies update their mapping tools, the City will follow suit to ensure the most up-to-date version exists within City-limits. 9 26-Aug-26 Public Commenter Verbal Question practitioner input Asked whether the City timely sought input from local wetland-planning, civil-engineering, and similar practitioners—not only delineators— and suggested giving Zenovic & Associates or another local firm an opportunity to review the proposal. review by any and all community members who wish to participate. The stakeholder working group was formed by internal discussions and was vetted by multiple City departments. Staff will reach out to local firms for their input prior to the close of the public hearing. Attachment B September 23, 2026 Planning Commission Regular Meeting 69 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 3 of 60 Comments - Public #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 10 26-Aug-26 Public Commenter Verbal Comment applicant cost Expressed concern that combined City, county, state, and federal maps may show false-positive features, omit completed delineations, create confusing mapped 'blobs,' and require property owners to pay to disprove mapping errors; cited a mapped stream disproved by delineation and an older delineation still absent from a commonly used map. tools and features are created equal, and that groundtruthing is an important part of performing any sort of analysis on a property that may contain a critical area. The due diligence has always been on the property owner to prove whether or not critical areas exist on a parcel. This regulation will not change with these updates. 11 26-Aug-26 Public Commenter Verbal Comment building costs Referenced/submitted a Seattle Times cost editorial, expressed concern that layered state and federal mandates increase building costs, and urged the City to push back on costly requirements. The handout text itself is not contained in the transcript. 12 10-Sep-26 Public Commenter Written Comment areas Opposed blanket prohibitions on development in critical areas, citing regulatory requests discussed at the August 25, 2026 City Council work session. in specific critical areas, which are all indivdually outlined in the applicable articles. These prohibited uses and activities are in place to not only protect the critical area's functions and values, but often times to protect the development from any hazards associated with the critical area, such as landslides, flooding, or tsunamis. 13 10-Sep-26 Public Commenter Written Comment Opposed restrictions on industrial variances, citing the August 25, 2026 City Council work session. the CAO does not intend to restrict industrial variances. Any individual or business is required to go through the same process for a variance pursuant to the criteria established in 15.22.100. Attachment B September 23, 2026 Planning Commission Regular Meeting 70 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 4 of 60 Comments - Public #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 14 10-Sep-26 Public Commenter Written Comment Opposed reinstating a “net ecological gain” standard. Comprehensive Plan indicates a strive for net gain, where feasible, while continuing to meet no-net-loss standards. This is reflected in the current proposed draft. 15 10-Sep-26 Public Commenter Written Comment industrial development Argued that the working waterfront and downtown were developed on artificial fill to support maritime and industrial activity and should be regulated in a manner that recognizes those conditions and economic functions, rather than treated like undisturbed natural areas. downtown were developed on artifical fill to support the industries currently in place. These locations are still susceptible to sea level rise, tsunamis, and coastal flooding, and must be regulated accordingly. Protection standards are there to also protect infrastructure from natural hazards, should they arise. 16 10-Sep-26 Public Commenter Written Comment and economic balance Expressed concern that requirements exceeding state mandates would discourage business recruitment and retention, investment, and job creation and harm working-waterfront businesses and families. Urged rejection of the requested restrictions and a CAO that balances environmental protection with economic viability. approach to environmental protection while also allowing for existing and new businesses to continue to operate within the bounds of what is reasonably acceptable. 18 21-Sep-26 Public Commenter Written Comment Reported that an expanding wetland and its buffers have reduced the buildable area of four remaining Phase 1 lots at Lang Heritage Homes on West 10th Street. Noted installed sewer capacity and electrical infrastructure intended to support additional homes, subject to approvals. Requested consideration of a referenced wetland delineation map and previously provided stormwater records and chronology. Attachment B September 23, 2026 Planning Commission Regular Meeting 71 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 5 of 60 Comments - Public #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 19 21-Sep-26 Public Commenter Written Comment An existing stormwater pipe is within immediate reach of the four remaining lots. Please evaluate whether a connection is feasible, including the pipe’s ownership, capacity, elevation, connection requirements, and any treatment needed. Please provide the City’s determination in writing. Public Works and Utilities Department. 20 21-Sep-26 Public Commenter Written Comment feature exclusion; stormwater discharges Requested a written, lot-by-lot determination of the wetland boundary, rating, buffer, building setback, and resulting buildable area. Asked what evidence is needed to evaluate whether an artificial-feature exclusion applies and how existing stormwater discharges will be assessed. of proof for wetland evaluations lies with the applicant/developer on a case- by-case basis. 21 21-Sep-26 Public Commenter Written Comment The stormwater design grant application deadline is September 30, seven days after this hearing. Please state whether the City can take any action toward an application by that date. If it cannot, please provide a written design and funding path for addressing the drainage conditions affecting Lang Heritage Homes. Public Works and Utilities Department. Attachment B September 23, 2026 Planning Commission Regular Meeting 72 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 6 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 22-Jul-26 Planning Commission Verbal Question Asked whether the Critical Areas Ordinance update must also comply with the Comprehensive Plan. to achieve the goals and policies set forth in the recently updated Comprehensive Plan while also adhering to the requirements for compliance with the GMA. 2 22-Jul-26 Planning Commission Verbal Comment environmental protection Requested clarification of how the City would prioritize housing or development when tree, wetland, or other environmental protections conflict with development objectives. that are otherwise encumbered by a critical area, pursuant to a reasonable use exception. Compensatory mitigaiton is needed in sitauations where impacts to a critical area cannot be avoided through a proposed development. 3 22-Jul-26 Planning Commission Verbal Comment and permit predictability Expressed concern that critical-area, SEPA, or other local review processes could recreate discretionary barriers, uncertainty, and delays that increase development costs and conflict with Comprehensive Plan housing- production objectives. development in critical areas, and when required, for the State Environmental Policy Act. The need to balance multiple goals and policies in the comprehensive plan including housing-production objectives and environmental regulation can best be achieved through smart land use planning that prioritizes infill and redevelopment in locations that are void of critical areas to reduce costs associated with affordable developments. 4 22-Jul-26 Planning Commission Verbal Question applicability Asked how tree protection applies when development affects a tree and whether the two-for-one tree- replacement provision would apply. are removed through development must be replaced at a 2:1 ratio. Further regulation regarding tree removals and replacements will be addressed at a later time when staff complete the Urban Forestry Chapter. Attachment B September 23, 2026 Planning Commission Regular Meeting 73 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 7 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 5 22-Jul-26 Planning Commission Verbal Question Asked whether trees on vacant lots outside critical areas may be removed without triggering the proposed critical-area requirements. that exist in city code regarding tree removals are those that are located in public right-of-way, and commercial and multi-family landscapes. No other regulation exists at this time that would prohibit tree removals on private property outisde of critical areas. 6 22-Jul-26 Planning Commission Verbal Question Asked whether Best Available Science developed by local, state, federal, or tribal sources must meet the criteria established in the Washington Administrative Code. science" as proposed is from the applicable Washington Administrative Code and must meet the criteria as established. 7 22-Jul-26 Planning Commission Verbal Question practices Asked who develops or establishes the best management practices that would be used to implement the ordinance. commonly developed by government agencies, environmental organizations and industry experts to guide sustainable and effective operations. This reduces potential bias and differing professional perspectives. 8 22-Jul-26 Planning Commission Verbal Comment recharge areas Emphasized the need to understand how critical areas will be mapped and the extent of properties potentially affected, particularly where mapped critical aquifer recharge areas encompass substantial portions of the City. designations of each critical area. While many parcels will fall within a critical aquifer recharage area, not all uses and activities on those parcels will be applicable to the regulations. 9 22-Jul-26 Planning Commission Verbal Question applicability Asked whether every property within the mapped critical aquifer recharge area would be affected by the ordinance. critical aquifer recharge areas will be affected by the ordinance. Regulated activities will be those commercial, industrial, or home occupations that process or handle hazardous materials in regulated quantities and/or treat or store regulated quantities of hazardous materials. Attachment B September 23, 2026 Planning Commission Regular Meeting 74 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 8 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 10 22-Jul-26 Planning Commission Verbal Comment protection Noted that future alternative water- supply needs could justify retaining aquifer mapping and protection work even if it was not currently mandatory. 11 22-Jul-26 Planning Commission Verbal Question Asked whether definitions should identify the standards and methods used to delineate each type of critical area, including wetland delineation standards. critical area are defined in the applicable articles. 12 22-Jul-26 Planning Commission Verbal Question Asked how and when existing critical- area functions and values will be identified during site screening and review. area identified will need to be addressed through the reporting process and evaluated by the qualified professional with expertise in the applicable critical area. 13 22-Jul-26 Planning Commission Verbal Comment Science; Tribal information Raised concern regarding references to Tribes within the Best Available Science provisions and requested consideration of how tribal information and the City's relationship with sovereign tribal governments are reflected in the ordinance. of "best available science" comes from WAC 365-195-910(1) which states, "consultation with state and federal agencies and tribes can provide a quick and cost-effective way to develop scientific information and recommendations." Attachment B September 23, 2026 Planning Commission Regular Meeting 75 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 9 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 14 22-Jul-26 Planning Commission Verbal Comment Commented that the proposed Best Available Science definition may be narrower than the cited WAC because it appears to focus on who prepared the information rather than the validity of the scientific process. updated the definition to be more consistent with those of other jurisdictions, which now reads as follows: "Best available science" means the current scientific information derived from a valid scientific process consistent with criteria established in WAC 365-195- 900 through WAC 365-195-925 used in the process to designate, protect, and/or restore critical areas 15 22-Jul-26 Planning Commission Verbal Comment Commented that defining a buffer as entirely “undisturbed” or “untouched” may conflict with later provisions allowing restoration, maintenance, trails, utilities, or other authorized activities within buffers; requested clarification. following to the end of the definition: unless otherwise exempted, allowed, or permitted by this chapter. 16 22-Jul-26 Planning Commission Verbal Question Asked whether activities included within the definition of “development” automatically require critical-area review or only when the activity may affect a critical area or buffer. required when the activity may impact a critical area or its buffer. 17 22-Jul-26 Planning Commission Verbal Comment importance Commented that the definition appears circular because it defines habitats of local importance as habitat areas found to be locally important; requested clarification. definition is intended to be broad so as to not limit which habitats and species the City has identified as being of local importance. 18 22-Jul-26 Planning Commission Verbal Question Asked whether the no-net-loss definition was incomplete or missing a period. Staff have corrected this. Attachment B September 23, 2026 Planning Commission Regular Meeting 76 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 10 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 19 22-Jul-26 Planning Commission Verbal Question Questioned what baseline is intended by “historical condition,” noting that conditions before an area was altered may be unknown or could extend far into the past. "historic condition" with that of "reference condition" which means a baseline standard, benchmark, or set of normal measurements used to compare and evaluate the health, quality, or performance of an ecosystem, environment, or scientific system. 20 22-Jul-26 Planning Commission Verbal Question activity Requested a clearer threshold for what constitutes land disturbance, including whether routine access, gardening, or minor soil disturbance would fall within the definition. the definition of "land disturbing activity" that states minor soil disturbance for site-investigation puroposes or routine garden maintenance are not considered land- disturbing activities. 21 22-Jul-26 Planning Commission Verbal Comment features Requested clarification or revision of the use of “usually” within the definition because it creates uncertainty regarding conditions that fall outside the typical description. with "often" in this definition. 22 22-Jul-26 Planning Commission Verbal Question Asked whether “waters of the state” is intended to include all surface waters and requested clearer language distinguishing regulated waters from artificial or constructed water features. has been relocated to 15.22.450.A.5 and the definition is consistent with that of RCW 90.48.020. While these do include surface waters, ponds that are less than 20-acres in size that were deliberately created from dry sites, including farm ponds and landscape amenities are not included in this definition. Attachment B September 23, 2026 Planning Commission Regular Meeting 77 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 11 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 23 22-Jul-26 Planning Commission Verbal Question Requested clarification of the education, experience, certification, and licensing requirements for qualified professionals, including whether the required professional experience applies to all listed degrees or only related fields. professional" has been modified to be more consistent with that of other jurisdictions, indicating what qualifications an individual must have specific to the critical area identified. 24 22-Jul-26 Planning Commission Verbal Question zone / Site-potential tree height Requested explanation of the scientific and regulatory basis for the 100- and 200-year site-potential tree- height concepts used in defining riparian management zones. conceptual model developed by the Forest Ecosystem Management Assessment Team to determine how to protect riparian areas in forested landscapes. The model conveys two important points: 1) four of the five riparian ecosystem functions or processes occur within one 200-year- SPTH, and 2) the marginal return for each function or process decreases as distance from the stream channel increases. Thus, designating a riparian area based on at least one SPTH at 200- years is a scientifically supported approach if the goal is to protect and maintain full function of the riparian ecosystem for aquatic habitats and species, including salmon. 25 22-Jul-26 Planning Commission Verbal Question professional opinions Asked which qualified professional controls when the City and an applicant rely on different professionals or technical opinions, how a third-party review would be initiated, and who bears the cost. capcity to review most technical reports prepared by a qualified professional. In some situations, if staff do not agree with the assessments prepared, they may hire a third-party reviewer to read and review the reports prepared by the applicant for consistency with the CAO. In this situation, the cost associated would be borne by the applicant. Attachment B September 23, 2026 Planning Commission Regular Meeting 78 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 12 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 26 22-Jul-26 Planning Commission Verbal Question Requested clarification of the critical- area setback definition, including how it differs from other setbacks in City code and whether it is intended primarily to protect development from hazardous conditions or protect the critical area. is specific to critical areas, as are all other definitions defined in Chapter 15.02. Building setbacks adjacent to critical areas are important for protecting the functions and values of the critical area while also protecting the development from potential hazards associated with the critical area. 27 22-Jul-26 Planning Commission Verbal Question Asked whether Chapter 15.20 was being deleted and replaced by Chapter 15.22 and why the new chapter was not being reviewed in full. with Chapter 15.22. At the time of the July meeting, not all of Chapter 15.22 had been drafted so the review of all applicable articles will be phased. 28 22-Jul-26 Planning Commission Verbal Question wetlands Asked whether the ponded area at Shane Park, which may have resulted from prior City actions, could now constitute a regulated wetland and whether the City plans to review the area. it is possible that this location would now be classified as such. Staff will discuss this topic in greater detail with the Parks & Recreation Director upon adoption of the CAO. 29 22-Jul-26 Planning Commission Verbal Comment scope Expressed concern that including Chapter 15.22 materials while assigning only selected sections for line-by-line review was confusing. 30 22-Jul-26 Planning Commission Verbal Comment activities Requested clarification of how the 30- day post-emergency reporting requirement will be enforced and what consequences apply if required reporting is not completed. requirements of this section would result in an unauthorized modification and would be subject to enforcement provisions of the Port Angeles Municpal Code at the owner's or other responsible party's expense. Attachment B September 23, 2026 Planning Commission Regular Meeting 79 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 13 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 31 22-Jul-26 Planning Commission Verbal Comment Commented that the exemption provisions appear to retain certain best-practice, restoration, mitigation, or other obligations, making it unclear which requirements do and do not apply to an exempt activity and whether a City determination is required. to undergo full critical area review, they still must adhere to best management practices that minimize or otherwise do not degrade a critical area or its buffer. These activities are unlikley to disturb a critical area or its buffer due to the nature of the activity or the location where the activity takes place, such as in a lawfully established garden or landscape. Any activity that does not specifically meet the definition of those in 15.22.070.F 1-5. 32 22-Jul-26 Planning Commission Verbal Question landscaping and maintenance Asked what routine landscaping, gardening, maintenance, or community cleanup activities are allowed under the exemption provisions and whether activities such as organized vegetation cleanup near bluffs could require review. lawfully created, meaning it has undergone previous critical areas review, the activities defined in 15.22.070.F.2 would be considered exempt. "Organized vegetation cleanup" that has not previously been reviewed under the critical areas regulation would require an approved restoration and management plan that would be subject to review. Once approved, future maintenance of those areas would be considered exempt. 33 22-Jul-26 Planning Commission Verbal Question methods Asked who determines what constitutes “reasonable methods” to avoid potential impacts when conducting an exempt activity. measures in their definitions that outline how to undergo the activity without impacting the criticial area or buffer. If the proponent determines at any point that their methods may not be considered reasonable, the burden of proof lies with the proponent and the decision on whether they are or not will be made by the Director of Community and Economic Development. Attachment B September 23, 2026 Planning Commission Regular Meeting 80 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 14 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 34 22-Jul-26 Planning Commission Verbal Comment activities and avoidance Commented that an absolute requirement to avoid impacts appears inconsistent with later provisions allowing utilities, trails, vegetation management, and hazard- tree work; requested language recognizing allowable impacts where avoidance is not feasible. following to minimize confusion and inconsistency: "All allowed activities must use mitigatoin sequencing and best management practices that result in the least amount of impact to the critical areas where practicable." 35 22-Jul-26 Planning Commission Verbal Question Requested clarification that limited vegetation or soil disturbance necessary for activities such as wetland delineation and site investigation is allowed. vegetation removal of non-tree or shrubs is allowed (such as grass and other herbaceous plants), provided the areas that are disturbed are properly restored to minimize erosion and sedimentation. 36 22-Jul-26 Planning Commission Verbal Comment projects Initially asked for clarification of “minor utility project,” then located the 75-square-foot threshold in the draft and withdrew the question. 37 22-Jul-26 Planning Commission Verbal Comment enhancement Raised concern that allowing tree thinning for viewshed enhancement could result in incremental damage or loss of trees and requested consideration of whether the exception is appropriate and sufficiently protective. viewshed enhancement have been drafted to ensure that best practices are utilized. Further management practices and guidance will be established in the preparation of the Urban Forest Management Plan. Attachment B September 23, 2026 Planning Commission Regular Meeting 81 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 15 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 38 22-Jul-26 Planning Commission Verbal Question enhancement Requested consistency between the viewshed-enhancement provisions and related definitions or standards applicable to geologically hazardous areas, ravines, and bluffs. enhancement in geologically hazardous areas (previously referred to as marine bluffs and ravines) are explained under 15.22.410.D. They are very similar but vary slightly from the provisions established in 15.22.080.A.4.h only because viewshed enhancements in geologically hazardous areas must also ensure the trimming will not lead to increased bluff instability. 39 22-Jul-26 Planning Commission Verbal Question Asked for clarification of the two-to- one replacement requirement for removed trees or vegetation and how the requirement applies within critical areas. buffer, whether permitted or not, they must be replaced at a 2:1 ratio (two new trees for each tree removed). This only applies to the critical areas provisions of this chapter. 40 22-Jul-26 Planning Commission Verbal Question Asked whether required tree replacement or mitigation may occur on another parcel owned by the same applicant and how that relates to future mitigation-banking provisions. installed adjacent to or near the location where trees were previously removed to mitigate for the lost functions and values of those trees in that particular location. If that isn't possible or there is a more suitable location for replacement trees, the Director may approve a subistitute location for plantings. 41 22-Jul-26 Planning Commission Verbal Question review Asked whether a property containing a critical area automatically triggers Type II review when the proposed development is located outside the critical area and buffer. development review staff determine that the proposed development will not have an impact on critical areas or their buffers, the applicant will not need to undergo a full Type II permit review. The applicant must demonstrate to staff the location of all proposed improvements in relation to any critical areas on or within 300-feet of the subject parcel on a site plan with the building permit for staff to adequately determine whether critical areas review will be triggered. Attachment B September 23, 2026 Planning Commission Regular Meeting 82 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 16 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 42 22-Jul-26 Planning Commission Verbal Comment Requested that the site- reconnaissance and review pathway shown during the presentation be incorporated or more clearly described in the code so property owners can understand when additional critical-area review is required. 15.22.110.B.1 to indicate that if during site reconnaissance it is determined that the proposed development is unlikely to impact a critical area or its buffer, additional reporting may not be required. 43 22-Jul-26 Planning Commission Verbal Comment corrections Identified several drafting and formatting issues, including a cross- reference punctuation error, “beset” rather than “best,” incomplete wording, and indentation of stream- crossing provisions. addressed all formatting and spelling errors. 44 22-Jul-26 Planning Commission Verbal Question exception Asked who determines what constitutes “reasonable use” for purposes of a reasonable-use exception. determining what a reasonable use is, these decisions are left to the Hearing Examiner to either approve or deny. 45 22-Jul-26 Planning Commission Verbal Question participation Asked whether the public receives notice and an opportunity to comment or participate when a reasonable-use exception or other critical-area permit may allow impacts to a critical area. applications are processed as a Type III permit, they are publicly noticed and open to a public comment period. Attachment B September 23, 2026 Planning Commission Regular Meeting 83 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 17 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 46 22-Jul-26 Planning Commission Verbal Comment feasibility and proportionality Raised concern that requiring the “best available” construction, design, and development techniques could be interpreted without a reasonable cost or feasibility limit or as an unlimited requirement for the most expensive construction available. possible" meaning that any development that is proposed as a reasonable use must use the best available construction, design, and development techniques to the best of the proponent's abilities, rather than being explicitly required. 47 22-Jul-26 Planning Commission Verbal Question construction standard Requested clarification that the provision concerns appropriate construction techniques rather than the quality or price tier of the building. actual construction techniques. 48 22-Jul-26 Planning Commission Verbal Comment Identified a potential incorrect internal code cross-reference within the reasonable-use provisions and requested correction. 49 22-Jul-26 Planning Commission Verbal Question taxation Asked whether creation of a critical- area tract creates a separate tax parcel and raised concern regarding continuing property-tax obligations for land that may not be developable. spearate tax parcel. They would remain with the existing tax parcel and simply go on title as being a recorded critical area, such as when wetland boundaries are shown on plats for development. 50 22-Jul-26 Planning Commission Verbal Question responsibility Asked who is responsible for maintaining a critical-area tract or easement, particularly where an adjacent property owner did not create the tract. critical area tracts are responsible for the maintenance and protection of the tracts. Maintenance of these areas consists primarily of ensuring the tract remains undisturbed. Attachment B September 23, 2026 Planning Commission Regular Meeting 84 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 18 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 51 22-Jul-26 Planning Commission Verbal Question markers Expressed concern that neighboring property owners could inadvertently enter, mow, or otherwise disturb a critical-area tract if its boundaries are unclear; requested confirmation regarding permanent fencing, signage, or other boundary marking. property owners may unintentionally mow or otherwise disturb a critical area tract, the permanent installation of fencing and signage will help reduce the chances of this happening. These provisions are established in 15.22.150.B and 15.22.160. 52 22-Jul-26 Planning Commission Verbal Question nomenclature and permit type Asked why the permit report listed critical-area exemptions as Type I when the earlier discussion appeared to place critical-area exceptions in Type III, and asked what “critical area exemptions” means. use of the term "exception" in existing regulation. Critical area exemptions are different than exceptions. Exemptions are those activities or uses that only meet the criteria provided in 15.22.070. These are activities or uses that will not impact a critical area due to either the nature of the activity, or the fact that it takes place in a portion of a critical area or buffer that has previously been reviewed under the CAO. Examples include passive outdoor activities, trail maintenance, and landscape and garden maintenance. Exceptions are defined as either a reasonable use exception or critical area variance and require full critical area review. Attachment B September 23, 2026 Planning Commission Regular Meeting 85 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 19 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 53 26-Aug-26 Planning Commission Verbal Question Plan, and land capacity Asked how the wetland-buffer options related to the Comprehensive Plan and what effect each option would have on buildable land and lot capacity. Comprehensive Plan can be found in the staff analysis. To sumarize, the comprehensive plan has many goals and policies identified to establish a land use pattern that is consistent with the community's vision while also protecting and enhancing our area's unique natural features and overall environment. Wetland buffers will vary depending on the option selected; however, buffer alternative 3 as proposed provides the most flexibility when it comes to single and multi- family developments adjacent to wetlands, and may even provide more buildable land than current regulations allow. 54 26-Aug-26 Planning Commission Verbal Question Asked whether the Comprehensive Plan land-capacity analysis used existing wetland buffers. was developed for the Comprehensive Plan Periodic update used existing wetland delineations from multiple sources including the City's own wetland GIS database, WDFW priority habitats and species, and the national wetland inventory. 55 26-Aug-26 Planning Commission Verbal Question Asked whether a map showed the City's current critical areas. some, not all, of the delineated critical areas including wetlands. Updating these maps will be a critical component of the implementation phase of this project. 56 26-Aug-26 Planning Commission Verbal Comment development cost Expressed concern that, although option 3 was flexible, it could be too complex for an ordinary landowner to understand without a professional and could cause some land to be treated as effectively unbuildable. alternative selected, all wetland reporting must be done by a qualified professional. Attachment B September 23, 2026 Planning Commission Regular Meeting 86 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 20 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 57 26-Aug-26 Planning Commission Verbal Question Asked whether any buffer option would allow a landowner to avoid hiring a qualified professional. a parcel that is adjacent to wetlands or their buffers, all reporting must be done by a qualified professional, regardless of the buffer alternative selected. 58 26-Aug-26 Planning Commission Verbal Question from BAS recommendation Asked whether the WAC provision allowing documented legal, social, cultural, economic, and political considerations, including a justified departure from a scientific recommendation, had been considered. must have a valid scientific reason listed on the record that justifies a different policy choice. Reasons that have been accepted in past cases include a documented need for essential public facilities, emergency access or public safety, protection of Tribal cultural resources, or conflicts with other legal obligations. Reasons that departures have been rejected include, assertions that longstanding buffers have reasonably performed, unsupported speculations on outcomes, selecting weaker science to achieve a desired outcome, and using scientific uncertainty to justify weaker protections. The city does not currently have the capcity to develop a valid scientific reason for deviating from the requirements of RCW 36.70A.172 and will utilize the best available science provided by state and federal agencies during this update. 59 26-Aug-26 Planning Commission Verbal Question guidance Asked whether the Department of Ecology's 2022 ready-to-go options had been considered and how they differed from the cited 2018 material. Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates while drafting these amendments. Within the 2022 document, under the Wetland Buffer Options, the July 2018 modified appendix is referenced as providing further clarification and detail on the three wetland buffer alternatives. So, even though the 2018 recommendations predate the 2022 guidance document, Ecology still recognizes those alternatives as the best available science. Attachment B September 23, 2026 Planning Commission Regular Meeting 87 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 21 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 60 26-Aug-26 Planning Commission Verbal Question expanded buffers Asked how an existing approved development or structure would be treated if a newly enlarged buffer encompassed it. may be encompassed by a larger buffer under the new regulations may continue to exists as a pre-existing non- conforming situation as established in PAMC 17.95. Further provisions for these situations is established in 15.22.060.C. 61 26-Aug-26 Planning Commission Verbal Question nonconforming structure Asked whether a nonconforming structure within a new buffer could be rebuilt in the same location if it was destroyed by fire. restoration or replacement of a structure that is damaged by fire or other natural disaster is allowed provided that a complete application for replacement is submitted within one year of the damage and the restoration or replacement is made to conform to the current critical areas regulations. If such regulations cannot be physically met without reducing the size of the strucutre, the restoration or replacement may not intesify any nonconformity that existed prior to the damage. 62 26-Aug-26 Planning Commission Verbal Question trigger Asked whether a vacant parcel with no wetland shown on City maps would need to undergo wetland delineation during development review. wetlands - the burden of proof lies with the applicant on demonstrating whether critical areas are present. If during development review staff are led to believe wetlands may exist on the property due to soil type, aerial imagery, etc., it may delay the building permit process to have a wetland analysis performed. It is in the applicant's best interest to do their due diligence and have a site reconnaissance performed prior to submitting a building permit for review to indicate whether critical areas are or are not present. Attachment B September 23, 2026 Planning Commission Regular Meeting 88 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 22 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 63 26-Aug-26 Planning Commission Verbal Question Asked whether the proposed system added a moderate-intensity category to the existing low- and high-intensity categories. alternative will add a monderate- intensity category to the existing low- and high-intensity categories. 64 26-Aug-26 Commission Verbal Comment Expressed support for buffer alternative 3. 65 26-Aug-26 Planning Commission Verbal Comment Noted that alternative 3 created a tradeoff because it was more flexible but less transparent to a landowner without professional assistance. alternative selected, all wetland reporting and delineations must be done by a qualified professional. 66 26-Aug-26 Planning Commission Verbal Comment Recommended using available WAC flexibility where justified, including for wetlands unintentionally created by road construction, while continuing to protect natural resources. those that were unintentionally created after July 1, 1990 as a result of the construction of a road, street, or highway. As such, protection standards for wetlands that have been created in that manner do not apply. 67 26-Aug-26 Planning Commission Verbal Question Asked whether the City could create a hybrid of options 2 and 3 by using a clear default buffer and requiring professional analysis only to reduce it. develop their own wetland buffer alternative at this time. If future direction is given to explore this further, staff would be happy to. 68 26-Aug-26 Planning Commission Verbal Comment Requested that the vote be delayed until staff reviewed the cited 2022 options and the Commission understood the complete range of choices. Attachment B September 23, 2026 Planning Commission Regular Meeting 89 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 23 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 69 26-Aug-26 Planning Commission Verbal Question currency Asked whether a buyer could identify the maximum possible buffer from the charts and then obtain a smaller buffer based on site conditions, and how long a prior delineation would remain usable. identified through the charts in 15.22.240. 70 26-Aug-26 Planning Commission Verbal Comment Expressed support for option 3 only if the City confirmed that the recommendation used the current 2022 guidance rather than relying on older material. 71 26-Aug-26 Planning Commission Verbal Comment recommendation on wetland buffers Recommended buffer alternative 3 with consideration of the exceptions or departure factors in WAC 365-195- 915. must have a valid scientific reason listed on the record that justifies a different policy choice. Reasons that have been accepted in past cases include a documented need for essential public facilities, emergency access or public safety, protection of Tribal cultural resources, or conflicts with other legal obligations. Reasons that departures have been rejected include, assertions that longstanding buffers have reasonably performed, unsupported speculations on outcomes, selecting weaker science to achieve a desired outcome, and using scientific uncertainty to justify weaker protections. The city does not currently have the capcity to develop a valid scientific reason for deviating from the requirements of RCW 36.70A.172 and will utilize the best available science provided by state and federal agencies during this update. Attachment B September 23, 2026 Planning Commission Regular Meeting 90 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 24 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 72 26-Aug-26 Planning Commission Verbal Question Asked whether the Commission had reviewed the proposed Article III wetland ordinance section by section rather than only the buffer options. 26th PC meeting. 73 26-Aug-26 Planning Commission Verbal Question Asked whether the City had data on buildings lost to flooding during approximately the last century to inform the frequently flooded-area standards. records of this data at this time. 74 26-Aug-26 Planning Commission Verbal Comment Commented that increasing the ravine or marine-bluff setback from 25 feet to 50 feet appeared reasonable for safety. 75 26-Aug-26 Planning Commission Verbal Question impacts and penalties Asked where enforcement or penalties for unauthorized environmental damage in stream corridors would be addressed. unauthorized critical areas impacts, including damage to stream corridors. 76 26-Aug-26 Planning Commission Verbal Question Asked whether the riparian buffer was measured from a tree, the outermost tree, the stream center, or another point. measured from one of the following features (whichever is the farthest from the center of the watercourse): the ordinary high-water mark, the top of the stream bank, or the edge of the channel migration zone if one exists. 77 26-Aug-26 Planning Commission Verbal Question Asked whether the riparian-buffer standard applied where a creek was piped beneath developed property. to the riparian buffer standards; however, if they are to be daylit then they would be subject to the applicable buffer standards. Attachment B September 23, 2026 Planning Commission Regular Meeting 91 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 25 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 78 26-Aug-26 Planning Commission Verbal Question of bank Asked whether 'bank' in the ordinary- high-water-mark or top-of-bank standard meant the stream bank or the top of the ravine and requested clearer wording. This has been updated for clarity. 79 26-Aug-26 Planning Commission Verbal Question critical-area map Asked whether the final critical-area map would return to the Planning Commission for review because the ordinance referenced the map. the GIS mapping has been integrated, staff can bring the mapping tool back to the Planning Commission for review. 80 26-Aug-26 Planning Commission Verbal Question professional Asked why 'professional' was replaced with 'scientific expert' without defining scientific expert and whether the two definitions should be reconciled. has been amended and no longer contains "scientific expert". 81 26-Aug-26 Planning Commission Verbal Question supplements Asked whether the regional supplements to the federal wetland delineation manual were federal, state, or locally developed. the US Army Corps of Engineers in partnership with state agencies. 82 26-Aug-26 Planning Commission Verbal Question Asked whether an applicant would still need to submit documentation to the City if no wetland existed. to deomnstrate the presence or absence of wetlands during development review. If no wetlands are present on a parcel to be developed, the applicant should be able to demonstrate that through either site plans or a site feasibility assessment when submitting building plans for review. Attachment B September 23, 2026 Planning Commission Regular Meeting 92 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 26 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 83 26-Aug-26 Planning Commission Verbal Comment agriculture wording Identified missing or misaligned item numbers and requested that the allowed-agriculture clause be revised so it did not say activities 'do not minimize adverse impacts,' using language such as no new or expanded adverse impacts instead. addressed. 84 26-Aug-26 Planning Commission Verbal Question Asked whether citations shown as Table 15.22.XXX were temporary placeholders. prior to final adoption. 85 26-Aug-26 Commission Verbal Comment Requested that the finalized critical- area map return to the Planning Commission for review. 86 26-Aug-26 Planning Commission Verbal Question aquifer regulation Asked about the legal and scientific basis for restricting land in an aquifer solely because it might become a future potable-water source. regulated in areas that are identified as a critical aquifer recharge area. This is to ensure groundwater protection from contaminants that are already regulated by the fire department, should the City choose to utilize aquifers as a source of potable water in the future. The City's legal department is currently reviewing the CAO. 87 26-Aug-26 Planning Commission Verbal Question connector Asked whether the two hazardous- material criteria should be joined by 'or' or 'and/or' rather than requiring both. addressed. Attachment B September 23, 2026 Planning Commission Regular Meeting 93 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 27 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 88 26-Aug-26 Planning Commission Verbal Question Asked whether designation as a critical aquifer recharge area changed the underlying zoning or permitted uses. changed, however, permitted uses may need to be updated to ensure consitency, specifically with activities that result from specific commercial, industrial, and home occupation uses that process and handle regulated materials and/or store regulated materials. 89 26-Aug-26 Planning Commission Verbal Question Asked whether the still-undrafted subsection would return to the Commission once completed. during the public hearing on September 23rd. 90 26-Aug-26 Planning Commission Verbal Question expansion Asked how much critical-area reporting would be required for a simple home or business addition that did not change the use or contamination potential. an existing home occupation or business is not changing, an applicant would state that information on their development application for staff to review. No further reporting would be required if they are compliant with the regulations established in Article IV. 91 26-Aug-26 Planning Commission Verbal Question Asked what 'other information as required by the City' could include and whether that standard was too vague. amended. 92 26-Aug-26 Planning Commission Verbal Comment Requested restoration of the missing subsection D and fuller text in subsection E on alteration of watercourses. addressed. Attachment B September 23, 2026 Planning Commission Regular Meeting 94 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 28 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 93 26-Aug-26 Planning Commission Verbal Question Asked whether the referenced habitat-area map existed or would be created. will need to be prepared by the qualified professional responsible for preparing the habitat management plan. The map should show the general location of the affected habitats in relation to the proposed development, similar to that of what is prepared on a site plan for other types of development proposals. 94 26-Aug-26 Commission Verbal Comment Recommended that the code explicitly require critical-area maps to be created and kept current. addressed. 95 26-Aug-26 Planning Commission Verbal Question geologic-hazard buffer Asked whether the provision increased a ravine setback from 25 feet to 50 feet and whether it also applied to bluff-side structures within shoreline jurisdiction. designation will now be defined as a geologically hazardous area, they will be subject to a 50-foot setback as opposed to a 25-foot setback. This is also consistent with the vegetation conservation area of the shoreline jurisdiction. The city will be updating their Shoreline Master Program in the coming years for consistency where needed. 96 26-Aug-26 Planning Commission Verbal Question replacement Asked why the provision prohibited felling, topping, or removal and then required 2:1 replacement when trees were felled. situations where violations of the regulation occur. If there is not path to compliance established, it is difficult to enfore noncompliance with regulation. 97 26-Aug-26 Planning Commission Verbal Question sufficiency Asked whether applying for a permit and planting two smaller trees was the only consequence if an owner intentionally removed a tree to improve a view. replacement, any individual out of compliance with regulation would also be subject to daily fees once a violation is established through code enforcement. Attachment B September 23, 2026 Planning Commission Regular Meeting 95 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 29 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 98 26-Aug-26 Planning Commission Verbal Question Asked whether the viewshed- enhancement process applied only to new development or also to an existing owner who later wanted to improve a view. of a development standard, meaning that it may be done with new development; however, vegetation management including viewshed enhancement is an allowed use per section 15.22.080 so existing developments may apply for this use pursuant to the criteria established. 99 26-Aug-26 Planning Commission Verbal Question arborist/mitigation reports Asked how long an approved arborist or mitigation report could be reused for recurring pruning without paying for a new professional report. possibly sooner if the best available science and best management practices for the particular use or activity are updated. 100 26-Aug-26 Planning Commission Verbal Comment notice/indemnification Expressed concern that the broad title notice and indemnification requirement could affect financing, insurance, and resale, and recommended legal review and consideration of recording the notice only after development in the hazard area was approved. language to "Upon permit issuance" rather than "prior to permit issuance". This draft is currently under review by the City's legal department. 101 26-Aug-26 Planning Commission Verbal Question importance Asked how the City would determine which species and habitats were locally important. species list, the City will coordinate with local natural resource professionals and the Lower Elwha Klallam Tribe to establish a list of locally important species and habitats. 102 26-Aug-26 Planning Commission Verbal Question Asked whether riparian management zones were fish and wildlife habitat conservation areas and whether RMZs should be expressly listed. specific type of fish and wildlife habtiat conservation area. They are expressly listed because of the extensive regulations from the Department of Fish and Wildlife for protection standards of anadromous fisheries. Attachment B September 23, 2026 Planning Commission Regular Meeting 96 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 30 of 60 Comments - Planning Commission #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 103 26-Aug-26 Planning Commission Verbal Question height map Asked whether field evidence could override the state SPTH map when the mapped dominant tree species did not match present conditions. is based on the NRCS soil type for a given location, not on the actual field- verified dominant tree species. It is the dominant species that a site could potentially support under the right growing conditions. 104 26-Aug-26 Commission Verbal Comment Commented that the added treatment of piped watercourses was reasonable and helpful. 105 26-Aug-26 Commission Verbal Comment Requested correction of the reference from 'EMZ' to 'RMZ.' corrected. Attachment B September 23, 2026 Planning Commission Regular Meeting 97 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 31 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 25-Aug-26 City Council Verbal Comment presentation Requested the slide deck and noted that the engagement questions required more review time, with additional written feedback to follow. 2 25-Aug-26 City Council Verbal Question Asked which director would make the decision referenced in Article I and slide 20. Development Director. 3 25-Aug-26 City Council Verbal Question Asked whether compensatory mitigation meant a monetary payment in lieu of impacts and what other forms it could take. compensatory mitigation. Additional mitigation measures include restoration (both re-establishment and rehabilitation), establishment, protection (preservation), or a combination of enhancement and protection. 4 25-Aug-26 City Council Verbal Question Asked whether compensatory- mitigation options and requirements would be included in the code or the planned handbook. under section 15.22.260. 5 25-Aug-26 City Council Verbal Question enforcement Asked whether the unauthorized-use and enforcement provisions would apply to people living or camping outdoors in critical areas. use of the underlying zone of critical areas, such as public building and parks, any unauthorized living or camping within critical areas would be subject to enforcement provisions of PAMC. Attachment B September 23, 2026 Planning Commission Regular Meeting 98 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 32 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 6 25-Aug-26 City Council Verbal Question mapping Asked whether critical aquifer recharge areas were present in Port Angeles and where they were located. Limits. Their locations will be identified through the implementation phase of this update when GIS maps are updated to reflect the adopted ordinance. The County has a current CARA map that can be referenced at this time. 7 25-Aug-26 City Council Verbal Question viewsheds Asked what tree management and tree retention meant in the update. limited to hazard tree removals and pruning for tree maintenance and viewshed purposes only. Additional tree retention and management practices will be established at a later time with the Urban Forest chapter and Urban Forest Management Plan. 8 25-Aug-26 City Council Verbal Comment Requested robust future discussion of activities and uses requiring greater caution, particularly where the policy intersected with homelessness and encampments. 9 25-Aug-26 City Council Verbal Comment protection Recommended proactive protection of potential future water sources because drought and low water levels increased their importance. 10 25-Aug-26 City Council Verbal Comment Recommended that the City take a more active role in restoring degraded critical areas while partnering with willing community organizations. Attachment B September 23, 2026 Planning Commission Regular Meeting 99 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 33 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 11 25-Aug-26 City Council Verbal Comment enforcement Recommended giving watershed protection, shade, and salmon habitat greater weight than viewshed enhancement through an enforceable process coordinated across code enforcement and police capacity. done in a manner that minimizes disturbance and prevents adverse effects on soil stability, fish and wildlife habitat, water quality, or water quantity. If an applicant cannot demonstrate these requirements through the permit process, a permit will not be approved. 12 25-Aug-26 City Council Verbal Comment systems Noted that the City's five stream and riparian corridors connected toward Olympic National Park and that upstream and downstream actions affected neighboring jurisdictions and required coordination. protection standards for riparian and wildlife corridors must be established between adjacent agencies, including the County, US Forest Service, DNR, and Olympic National Park. 13 25-Aug-26 City Council Verbal Comment Noted that homes, industry, and parks already existed near critical areas and recommended strong setbacks and buffers rather than blanket prohibitions. for each of the five critical areas, based on the best available science and recommendations from the state agencies that govern the areas. 14 25-Aug-26 City Council Verbal Comment development limits Recommended that potential mature tree height inform development setbacks and that the City deny development on some sites rather than grant an exception. reasonable use of a property due to the presence of critical areas. There is a legal obligation to allow for a reasonable use exception. If the city is interested in denying future development on parcels of land that are completely encumbered by critical areas, direction should be given to explore a buy-back program of sorts to purchase parcels of interest. Attachment B September 23, 2026 Planning Commission Regular Meeting 100 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 34 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 15 25-Aug-26 City Council Verbal Comment Recommended working with state legislators on a buyback program to acquire parcels unsuitable for development and protect them permanently through conservation easements. 16 25-Aug-26 City Council Verbal Comment Recommended greater scrutiny of uses involving oil, gasoline, diesel, and similar hard-to-clean contaminants near critical areas. addressed in Article IV, critical aquifer recharge areas. 17 25-Aug-26 City Council Verbal Comment Recommended accounting for traffic and road impacts, including tire- related contaminants and stormwater treatment before runoff reached critical areas. the City's stormwater regulations would best address treatment prior to runoff. Additionally, maintaining adequate, healthy vegetation buffers along our stream corridors assists with polutant filtering. 18 25-Aug-26 City Council Verbal Comment Requested robust public GIS layers showing wetlands, critical areas, wellhead-protection areas, and aquifers rather than limiting those maps to internal use. internal and external users. The City maintains a public-facing GIS portal that will be updated with new critical area layers during the implementation phase. 19 25-Aug-26 City Council Verbal Comment Expressed concern that applicant- hired technical reports could create bias and recommended independent third-party review focused on objective environmental analysis. Community and Economic Development to engage in third-party review of critical area reports, if during review,it is determined that additional external review is warranted. Attachment B September 23, 2026 Planning Commission Regular Meeting 101 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 35 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 20 25-Aug-26 City Council Verbal Comment interagency notice Requested prompt, reliable notice to the City and follow-through for emergency shoreline or erosion permits issued by state agencies, including during lengthy finalization periods and ownership changes. be addressed during the periodic update to the City's shoreline master program. 21 25-Aug-26 City Council Verbal Comment switching Recommended fully protecting aquifers and evaluating them as a future source-switching or supplemental-water option when Elwha River flows were low. 22 25-Aug-26 City Council Verbal Comment Noted that tree retention supported carbon sequestration and neighborhood cooling. 23 25-Aug-26 City Council Verbal Comment Recommended active restoration of degraded locations such as the former mill site, Valley Creek, and the lagoon, supported by additional natural-resources staffing and field capacity. 24 25-Aug-26 City Council Verbal Comment Identified the need for additional enforcement capacity if the ordinance were expected to address unauthorized camping and other critical-area violations. Attachment B September 23, 2026 Planning Commission Regular Meeting 102 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 36 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 25 25-Aug-26 City Council Verbal Question Asked whether no-topping or tree- felling restrictions would apply to City-owned trees near the airport. outside of a critical area, as such, the regulations under this chapter would not apply. However, during the urban forestry chapter development, best management practices will be established for all other trees on city- owned property, including trees at Lincoln Park near the airport. 26 25-Aug-26 City Council Verbal Question Asked whether the amendments would make the Waterfront District's effort to open the view behind the waterfront hotel more difficult. make the existing project for viewshed enhancement behind the Red Lion Motel - the viewshed enhancement provisions are only being modified slightly from current regulation to ensure best management practices are up to date. 27 25-Aug-26 City Council Verbal Comment Commented that the eight policy questions should have been available earlier and noted that more considered written feedback would follow review of the emailed deck. 28 25-Aug-26 City Council Verbal Question Asked whether the City could use the existing County aquifer map for its public GIS without commissioning new survey work. existing County map showing the location of the critical aquifer recharge areas. 29 25-Aug-26 City Council Verbal Comment Recommended that the City take a large, visible leadership role in restoring degraded critical areas. await future guidance from leadership in these efforts. 30 25-Aug-26 City Council Verbal Question Asked whether the City currently had two code-enforcement officers. Attachment B September 23, 2026 Planning Commission Regular Meeting 103 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 37 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 31 25-Aug-26 City Council Verbal Comment Requested visual maps of stream corridors, including buried streams beneath roads, shorelines, ravines, and aquifers, to show where policy would apply and support defensible decisions. be updated during the implementation phase of this project upon Council adoption. 32 25-Aug-26 City Council Verbal Question Asked how the ordinance or related plans would address downtown and other shoreline areas built on fill when considering climate-change and shoreline risk. during the City's periodic review of the Shoreline Master Program. Greater scrutiny may be required when considering factors such as sea level rise and earthquake and tsunami hazards, given the location and extent of the known geologically hazardous areas associated with downtown. 33 25-Aug-26 City Council Verbal Comment Recommended revisiting net ecological gain, providing a clear opportunity for public discussion, and incorporating public Comments on standards grounded in best available science. recently updated comprehensive plan, the critical areas ordinance will strive for net gain of ecological functions and values while also maintaining no-net- loss as the currently accepted best available science from the Department of Fish and Wildlife's guidance documents. Additionally, various state agencies, including WDFW, are currently reviewing the draft CAO for meeting statutory requirements. The public is invited to review and comment during the Public Hearing on September 23rd. 34 25-Aug-26 City Council Verbal Comment enforcement Recommended a specific, transparent variance and enforcement process that avoided selective treatment based on complaints, wealth, business influence, or ability to navigate the application process. Attachment B September 23, 2026 Planning Commission Regular Meeting 104 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 38 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 35 25-Aug-26 City Council Verbal Comment access Recommended protecting kelp and eelgrass from anchoring impacts, considering public mooring buoys or additional public dock space for smaller vessels, and evaluating harbor access equitably without prioritizing large business interests. recommendations can be incorporated during the City's Shoreline Master Program periodic update. A no-anchor zone in kelp and eelgrass protection zones will be established. 36 25-Aug-26 City Council Verbal Comment supply Recommended protecting aquifers and water-storage capacity and evaluating alternate water sources in light of drought and regional watershed concerns. 37 25-Aug-26 City Council Verbal Comment Recommended that tree policy recognize parcel interdependence, including shade and microclimate benefits supplied by neighboring trees, and manage the urban canopy holistically. addressed through the development of the Urban Forestry Chapter and Urban Forest Management Plan. 38 25-Aug-26 City Council Verbal Comment development Recommended avoiding inequitable treatment between new development and existing property owners while protecting critical areas and preserving reasonable buildability. proposed development on land that is within or adjacent to a critical area must adhere to the regulations established to protect the ecological functions and values of the critical area, and to ensure that any proposed use or development is safe for the individual or business interested in development. Attachment B September 23, 2026 Planning Commission Regular Meeting 105 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 39 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 39 25-Aug-26 City Council Verbal Comment development Recommended that the CAO address new and existing development on unstable marine bluffs, larger buffers, downstream safety impacts, taxpayer exposure, and consistent enforcement, with more detail in later presentations. 40 25-Aug-26 City Council Verbal Comment administration Recommended updated definitions and clear standards to reduce inconsistent answers while preserving flexibility for project- specific circumstances. has been updated to reflect all current definitions and consolidated for ease of use. 41 25-Aug-26 City Council Verbal Question cities Asked how many comparable jurisdictions used in the code review also relied on a single water source. are regulated under the EPA in Western Washington. Of the comparable jurisdictions used in this code review, three of them fall within the sole source aquifer mapped locations established under the EPA. Additional cities, such as Bellingham, rely on a single-source for drinking water that is not an aquifer, similar to Port Angele; however, they have chosen not to adopt any regulation for CARAs becuase they do not currently use aquifers as a source of potable water. 42 25-Aug-26 City Council Verbal Question Asked how many qualified professionals were locally available to prepare required reports and whether limited availability could make the ordinance impracticable. professionals that they distribute to applicants who request it. They city can develop one of their own or refer to the County's list, if desired. Attachment B September 23, 2026 Planning Commission Regular Meeting 106 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 40 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 43 25-Aug-26 City Council Verbal Question Asked whether the ordinance would apply to the urban growth area, including the proposed boundary swap identified in the Comprehensive Plan. areas within City Limits. 44 25-Aug-26 City Council Verbal Comment groundwater supply Noted that persistent drought and reduced snowpack increased the value of the planned groundwater project and expressed concern that contamination would undermine that future resource. 45 25-Aug-26 City Council Verbal Comment Recommended preserving opportunities for low-contaminant or biodynamic agriculture while distinguishing those activities from uses that could damage aquifers. commercial agriculture and animal husbandry. Any other sort of hobby farming or otherwise "backyard" agricutlure would not be required to undergo critical area permit review. 46 25-Aug-26 City Council Verbal Question exemption Asked whether the exemption for forest practices regulated by the state meant that the state itself was broadly exempt from the CAO. by the state are those that are reviewed under RCW 76.09. This does not provide the state a blanket exemption from the critical areas review. 47 25-Aug-26 City Council Verbal Comment mechanisms Recommended distinguishing erosion driven by stormwater runoff and geologic instability from shoreline erosion driven by wave action while addressing both through the appropriate critical-area and stormwater tools. by the Public Works Department and thus, any amendments to the existing stormwater regulation must be developed by the appropriate department. CED will address bluff erosion and best management practices for stormwater runoff during the updates to the Shoreline Master Program. Attachment B September 23, 2026 Planning Commission Regular Meeting 107 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 41 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 48 25-Aug-26 City Council Verbal Comment Recommended retaining existing downtown trails while considering over-water redesign as an immersive path that could improve public access and reduce nearshore impacts. updates to the Shoreline Master Program. 49 25-Aug-26 City Council Verbal Comment and restoration Recommended that the City lead by protecting its own critical areas, relocating infrastructure where feasible, and advancing naturalized shoreline protection at Ediz Hook using large wood and native vegetation. updates to the Shoreline Master Program and with future guidance from Council. 50 25-Aug-26 City Council Verbal Comment shoreline redevelopment Requested strong, usable CAO direction for environmentally responsible future development of the downtown nearshore and former mill property. mill property are primarily regulated under the Shoreline Master Program, and any additional direction for the future development of these areas will need to be provided during the updates the the SMP. 51 25-Aug-26 City Council Verbal Comment Recommended keeping mitigation within Port Angeles and preferably within the same watershed or riparian system rather than shifting ecological impacts elsewhere. requirements specific to wetlands in 15.22.260 and 15.22.520 for fish and wildlife habitat conservation areas. Attachment B September 23, 2026 Planning Commission Regular Meeting 108 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 42 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 52 25-Aug-26 City Council Verbal Comment schedule Recommended submitting written questions early enough for review and preserving the schedule between the Planning Commission hearing and Council first reading so revisions could be incorporated without a last- minute scramble. questions as soon as possible after the completion of the Public Hearing. 53 25-Aug-26 City Council Verbal Comment Identified Port Townsend and the Jefferson County Marine Resources Committee as references for boat- mooring approaches. when further establishing boat-mooring approaches during the SMP updates. 54 25-Aug-26 City Council Written Comment Recommended supporting conservation and restoration, native vegetation and invasive-species work, stream, wetland, riparian, floodplain, fish-passage and habitat projects, low-impact recreation and education, environmental research and monitoring, and Indigenous stewardship practices. supported as either exempt or allowed uses established in 15.22.070 and 15.22.080. 55 25-Aug-26 City Council Written Comment Recommended greater scrutiny of intensive residential, commercial, industrial, roadway, parking, and recreation uses; grading, clearing, hazardous-material, impervious- surface, drainage-altering, groundwater-affecting, and mature- vegetation-removal activities; and directing intensive development away from critical areas and buffers where alternatives existed. regulated as either Type II or Type III critical areas permits and must adhere to the requirements to be established herein. Attachment B September 23, 2026 Planning Commission Regular Meeting 109 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 43 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 56 25-Aug-26 City Council Written Comment Recommended treating buffers as part of the protection strategy because adjacent development could affect stormwater, sediment, temperature, groundwater, hydrology, wildlife movement, vegetation, noise, light, floodplain function, and salmon habitat. required part of any proposed use or activity and are established within each applicable article. 57 25-Aug-26 City Council Written Comment Recommended that wetland policy consider ecological function and value, size, condition, type, connectivity, development impacts, buffers, best available science, climate change, public benefits, existing development, Tribal treaty rights and cultural resources, and restoration opportunities. drafted under Article III - Wetlands. 58 25-Aug-26 City Council Written Comment Recommended prioritizing aquifer recharge protection and limiting activities that could contaminate groundwater, compact soils, create extensive impervious cover, alter drainage, or reduce infiltration. drafted under Article IV - Critical Aquifer Recharge Areas. 59 25-Aug-26 City Council Written Comment water Recommended clean stormwater infiltration and, where feasible, managed aquifer recharge to support a protected aquifer, municipal well, treatment, and supplemental or emergency residential supply, subject to hydrogeologic, water-quality, regulatory, and water-rights analysis. need to be incorporated into the City's Stormwater section of code, which is managed by the Public Works and Utilities Department. Attachment B September 23, 2026 Planning Commission Regular Meeting 110 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 44 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 60 25-Aug-26 City Council Written Question distinction Asked whether the CAO would distinguish private view enhancement from significant public scenic views and whether the two types of viewsheds should be identified separately. from significant public views would be difficult to separate, as the parcels that contain trees and other vegetation are owned by various entities, including a mix of private and public ownership. Staff may consider separating the two with the addition of the Urban Forestry chapter, if capacity exists. 61 25-Aug-26 City Council Written Comment Recommended allowing viewshed enhancement only where it does not compromise critical-area functions and values, favoring selective pruning, thinning, and carefully designed view corridors over extensive vegetation removal, with greater protection where vegetation supports slope stability, habitat, shoreline, or other critical-area functions. drafted under section 15.22.080.A.4.h and 15.22.410.D. 62 25-Aug-26 City Council Written Comment Recommended City-led restoration of parks, rights-of-way, stormwater facilities, stream corridors, wetlands, and floodplains; prioritizing landscape-scale benefits; and offering landowners technical assistance, grants, permit help, recognition, and nonprofit partnerships. await further guidance from leadership on these efforts. 63 25-Aug-26 City Council Written Comment Requested a natural-resources and nonprofit roundtable so restoration experts could review the draft CAO before the public-comment stage, complementing the builder roundtable. of various natural resource professionals has been meeting regularly through these updates. Their Comments and quetsions are addressed within this matrix. Attachment B September 23, 2026 Planning Commission Regular Meeting 111 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 45 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 64 25-Aug-26 City Council Written Comment Commented that private ownership should not exempt wetlands, streams, fish habitat, aquifer recharge areas, or other critical resources from CAO protection and recommended a local regulatory layer that respected lawful property rights. ownership, are subject to the provisions of the critical areas protection standards. 65 25-Aug-26 City Council Written Comment Recommended protecting high-value mature, native, habitat, riparian, and shade trees; evaluating canopy at the neighborhood scale; allowing reasonable removal of dead, diseased, hazardous, poorly located, or unavoidable trees; and directing City investment toward areas with low canopy. issues and more will be addressed through the development of the Urban Forestry Chapter. 66 25-Aug-26 City Council Written Comment Requested clarification of PAMC 15.22.060(C) so modification rights applied to a habitable existing structure and could not be used to remodel an uninhabitable structure while retaining nonconforming status. existing structures that were outside of the previously established buffers, but with the new regulation, may be located within a critical area buffer. It provides a pathway for minor modifications of these lawfully established strucutres to occur, even if they are located in an area that would now be considered for full critical area review for a new development. Attachment B September 23, 2026 Planning Commission Regular Meeting 112 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 46 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 67 25-Aug-26 City Council Written Comment Recommended replacing or moving beyond no net loss toward net ecological gain because no-net-loss policy could shift rather than repair environmental impacts. adopted comprehensive plan indicate that critical areas regulations should strive for net ecological gain, but continue to meet no-net-loss of ecological functions and values. That said, wetland mitigation requirements give prefernce to re-establishment that results in a gain in wetland area and function, and fish and wildlife habitat conservation area mitigation must achieve equivalent or greater biologic and hydrologic functions. This regulation maintains a balance between what is feasible for local landowners while also striving for net gain when possible. 68 25-Aug-26 City Council Written Comment Recommended keeping water and mitigation benefits within the affected watershed and maintaining healthy riparian forests rather than shifting mitigation outside the local system. incorporated within mitigation standards. 69 25-Aug-26 City Council Written Comment implementation capacity Recommended expanding restoration capacity and inventorying priority needs, including wildlife activity, Valley Creek, Ediz Hook, the former mill site and bluff toe, wetlands, aquifers, riparian habitat, pocket estuaries, the lagoon, culverts, fish passage, and invasive-species removal. Council on these efforts. 70 25-Aug-26 City Council Written Comment Recommended establishing a program to identify and acquire priority parcels within critical areas for permanent conservation. Council on these efforts. Attachment B September 23, 2026 Planning Commission Regular Meeting 113 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 47 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 71 25-Aug-26 City Council Written Comment Requested an interactive public map with switchable critical-area and FEMA layers and the ability for natural-resource staff to add field observations and baseline changes so the information remained current. incorporated into the public-facing GIS imagery during implementation. 72 25-Aug-26 City Council Written Comment Recommended clear, user-friendly requirements and applications, staff training, and coordination of local permits with state and federal permitting requirements. during implementation. Staff are always looking for ways to coordinate local permitting with state and federal requirements. 73 25-Aug-26 City Council Written Comment Recommended formalizing communication among the City, County, Tribes, and state agencies when emergency shoreline protection was authorized and tracking completion through permit finalization and ownership changes. updates the the Shoreline Master Program with further guidance from Council. 74 25-Aug-26 City Council Written Comment Requested a clear explanation of federal, state, and local wetland roles, including federal dredge-and- fill jurisdiction, state water-quality, shoreline and SEPA requirements, and local land-use, buffer, clearing, grading, and CAO controls. wetlands at the local level, utilizing the guidance and oversight from the Department of Ecology and the US Army Corps of Engineers. Any Type II and above critical area permit will also trigger SEPA review, which is reviewed by Department of Ecology and other state agencies. The city has the ability to set buffer widths, local land use policies, clearing and grading regulations, and CAO requirements based on guidance from state and federal agencies. Attachment B September 23, 2026 Planning Commission Regular Meeting 114 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 48 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 75 25-Aug-26 City Council Written Question encumbrance Asked how the City would notify appraisers, assessors, owners, buyers, and real-estate professionals about development limits and whether parcels would be formally flagged or encumbered when critical areas were present. mapping tools, appraisers, owners, etc. will be able to easily identify whether a parcel is likely to contain 76 25-Aug-26 City Council Written Comment Recommended an independent technical-review process in which the City defined the scope and selected or retained the reviewer, the applicant paid, conflict safeguards applied, peer review could be required, findings were transparent, and the City retained final decision authority. regulation for situations where the City may hire a third-party, independent review of development proposals at the expense of the applicant. 77 25-Aug-26 City Council Written Comment analysis Recommended continuing analysis beyond a consultant's conclusion of no impact by evaluating affected functions, magnitude, duration, reversibility, worst-case conditions, cumulative development, climate- change conditions, uncertainty, and the consequences of mitigation failure. does not comply with the regulations of the CAO, additional information may be requested for further review. Similarily, the provisions of 15.22.170 may come into place should a situation of this nature arise. 78 25-Aug-26 City Council Written Comment Recommended a process to seek appropriate Tribal and resource- agency expertise for projects involving salmon, shorelines, habitat, cultural resources, or water quality without transferring the City's decision authority. the potential to impact a critical area or cultural resource is always routed to the appropriate Tribal and resource- agencies for their review and comment. Attachment B September 23, 2026 Planning Commission Regular Meeting 115 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 49 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 79 25-Aug-26 City Council Written Question sections Asked why the Director could exempt particular sections of a critical-area report under PAMC 15.22.110(B). determined that a full critical areas report is not required, due to either the nature of the proposal or the lack of a critical area near the project location, certain portions of the report requirements may be exempt. This would only apply in limited situations and after a complete review of the development submittal. Another example may be if a proposed project will have no impact on a critical area, the Director may exempt the mitigation and monitoring components of the report. 80 25-Aug-26 City Council Written Comment Recommended relabeling PAMC 15.22.110(B) as required report sections; including standard methodology, existing-condition, species, habitat, impact, water, ordinary-high-water-mark, geotechnical, and mitigation elements as applicable; and removing 'adversely' so all impacts were identified regardless of magnitude. such to reduce confusion. Specific report requirements are established for each of the critical areas and contain items relevant to the applicable critical area. Adversely has been removed. 81 25-Aug-26 City Council Written Comment assumptions Recommended requiring a consultant no-conflict-of-interest declaration and City approval of material report assumptions before a technical report was finalized. addressed when specific circumstances arise. 82 25-Aug-26 City Council Written Comment Recommended replacing the no-net- loss standard in PAMC 15.22.130 with net ecological gain. where feasible, enhancement of functions and values." Attachment B September 23, 2026 Planning Commission Regular Meeting 116 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 50 of 60 Comments - City Council #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 83 25-Aug-26 City Council Written Comment Recommended recording an encumbrance against the property until required mitigation was complete so the obligation survived a sale and the public investment was protected. condition to any permit during the permit review and issuance. Failure to comply with the mitigation requirements would be a violation of the property owner and subject to the enforcement provisions of PAMC. 84 25-Aug-26 City Council Written Comment Requested examples of approved signs and fencing used to protect critical areas. during implementation and will share drafts with Planning Commission and Council as requested. 85 31-Aug-26 City Council Written Comment aquifer recharge Recommended pairing any future City groundwater-well project with aquifer recharge so high-flow recharge could support supplemental groundwater use during low Elwha River flows. the Public Works Department on these efforts with future guidance from leadership. 86 31-Aug-26 City Council Written Question source options Asked whether the City could prepare a watershed inventory of water rights to identify options and the pros and cons of aquifer recharge, groundwater wells, and source switching during low Elwha River flows. leadership, and capacity, to work on a project of this nature. 87 31-Aug-26 City Council Written Comment examples Noted that Washington’s Water Initiative was seeking community input and provided Kitsap and Sequim-Dungeness managed- aquifer-recharge examples for context. Attachment B September 23, 2026 Planning Commission Regular Meeting 117 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 51 of 60 Comments - Community Stakeholders #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 4-Aug-26 Stakeholder Verbal Question restoration Asked whether restoration efforts or activities are included within the definition of “development” and suggested adding a formal definition of “restoration.” under the umbrella of "development", however, they are subject to the exempt and allowed uses activities regulated under the proposed 15.22.070 and .080. A definition for restoration has been added. 2 4-Aug-26 Stakeholder Verbal Question Requested verification of the WAC citations and the source and reliability of information used in the “priority species” definition. from WAC 173-26-020(31). 3 4-Aug-26 Stakeholder Verbal Question Asked what specific conditions trigger third-party review, who selects the reviewer, and what criteria the City uses to determine when review is required. third-party review may be warranted. The reviewer would be chose by the City, at the applican'ts expense, if a proposal does not adhere to the criteria established, or if there appear to be discrepencies with reporting based on institutional and local knowledge. 4 4-Aug-26 Stakeholder Verbal Question costs Asked who makes the controlling determination when technical experts disagree, how conflicting professional opinions are resolved, and who is responsible for associated review costs. 5 4-Aug-26 Stakeholder Verbal Question Requested additional explanation of how critical areas are accounted for or subtracted in the Land Capacity Analysis and how that relates to conclusions regarding development capacity. performed during the comprehensive plan periodic update did not take into consideration the acreage contained within critical areas. They were otherwise exempted from the land capacity analysis and not included in the conclusions regarding development capacity within the city. Attachment B September 23, 2026 Planning Commission Regular Meeting 118 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 52 of 60 Comments - Community Stakeholders #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 6 4-Aug-26 Stakeholder Written Comment Suggested broadening the definition of “no net loss” beyond fish life and wildlife habitat to address ecosystem functions and values consistent with WAC 365-196-830(4). addressed accordingly. 7 4-Aug-26 Stakeholder Written Comment Suggested revising the purpose statement to include protection and, where feasible, enhancement of critical-area functions and values, consistent with the 2023 amendment to RCW 36.70A.020(10). addressed accordingly. 8 4-Aug-26 Stakeholder Verbal Comment Aquatic resources Flagged the proposed public-trust language as a federal-water- regulation legal term. 9 4-Aug-26 Stakeholder Verbal Question economic use Requested clarification of the extent of the City’s “limited flexibility” when applying critical-area requirements and what constitutes reasonable economic use of a property. economic use" of a property would be decided by the hearing examiner. In most instances, a reaonable economic use may be considered a single-family residence, or potentially a mixed-use facility, depending on the underlying zone. "Limited flexibility" means that the regulations established in the CAO must be construed narrowly and are not intended to be interpreted in various ways. Attachment B September 23, 2026 Planning Commission Regular Meeting 119 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 53 of 60 Comments - Community Stakeholders #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 10 4-Aug-26 Stakeholder Written Question enhancement Requested identification of the Best Available Science supporting the 25- percent living-canopy thinning standard and explanation of how the standard protects shade, temperature, microclimate, and wildlife-screening functions. given tree is based on industry practice developed by the International Society of Arboriculture for maintaining tree health and vigor. Most of the requests the City receives for viewshed enhancement are for trees located in geologically hazardous areas and are not adjacent to watercourses. In situations where that request may come into play, maintaining 75% of a tree's canopy will allow the tree to continue to provide the ecosystem services such as shade, temperature management, steep slope erosion control and bluff stability. 11 4-Aug-26 Stakeholder Verbal Question Asked which regulation controls when critical-area requirements conflict with another code provision and how such conflicts may affect future use or development of a property. conflict with the CAO requirements, that which provides the greater protection of the critical area's functions and values takes precedence. This provision is found in 15.22.020.B. 12 4-Aug-26 Stakeholder Verbal Comment Suggested adding specific code cross-references or links to related provisions governing applicability and review. prior to final adoption for easy reference. 13 4-Aug-26 Stakeholder Verbal Comment maps Requested that procedures for updating critical-area maps and designations accommodate updated information, new sources, and changing site conditions. outside of the CAO for how and when to update City maps, in coordination with the GIS department. Attachment B September 23, 2026 Planning Commission Regular Meeting 120 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 54 of 60 Comments - Community Stakeholders #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 14 4-Aug-26 Stakeholder Verbal Question Requested confirmation that qualified-professional determinations rely on recognized education, experience, certification, and licensing standards. a degree, certification, or experience in the field in which they are representing. 15 4-Aug-26 Stakeholder Verbal Comment Suggested combining or revising the purpose provisions to more clearly integrate environmental and habitat protection into the ordinance’s core purpose. 16 4-Aug-26 Stakeholder Verbal Comment Suggested including environmental protection within the health, safety, and welfare criteria used to evaluate a reasonable-use request. in 15.22.100.A.4 and A.5, which require the reasonable use exception to be consistent with the purpose and intent of the chapter and will result in no net loss of ecological functions and values. 17 4-Aug-26 Stakeholder Verbal Comment Development and variance Raised concern about development and variance implications under the wetland-buffering options. permit and must receive approval by the Hearing Examiner. These provisions are outlined in 15.22.100. 18 4-Aug-26 Stakeholder Verbal Comment Emergency reporting Suggested shortening the 30-day post-emergency reporting period because 30 days may be too long to adequately document and evaluate emergency work. reduced the 30-day requirement to 14 days. Attachment B September 23, 2026 Planning Commission Regular Meeting 121 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 55 of 60 Comments - Community Stakeholders #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 19 4-Aug-26 Stakeholder Verbal Question Requested clarification of how mitigation is proposed, reviewed, conducted, monitored, and managed, including responsibility for overseeing the process. needing mitigation, specific mitigatoin standards are outlined in each applicable article. For example, wetland mitigation requirements must adhere to a mitigation plan that is consistent with the Wetland Mitigation in Washinton State - Part 2, developed by the Department of Ecology. Fish and Wildlife Habitat Conservation Areas must have a habitat management plan developed for any proposed use imapcting those areas. How a professional chooses to draft monitoring and oversight is up to the consultant, but must be approved by the city. 20 4-Aug-26 Stakeholder Verbal Question Asked why the applicant bears responsibility for demonstrating that proposed mitigation meets ordinance requirements. providing a mitigation plan for review by the city, who then determines if it meets the ordinance requirements. It is up to the applicant to hire a qualified professional who can develop a plan that is consistent with the ordinance, rather than having the city be responsible for the preparation of such plans. 21 4-Aug-26 Stakeholder Verbal Comment crossings Suggested adding specific provisions addressing when and how directional boring beneath streams may be permitted and regulated. 22 4-Aug-26 Stakeholder Verbal Question Asked whether the City currently has, participates in, or intends to establish a mitigation bank and when mitigation banking may be used. participate in a mitigation bank within city limits. Attachment B September 23, 2026 Planning Commission Regular Meeting 122 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 56 of 60 Comments - Community Stakeholders #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 23 4-Aug-26 Stakeholder Verbal Question Reasonable use Requested clarification of the meaning and application of “reasonable use” and suggested providing relevant case-law examples or implementation guidance to assist with future interpretation. "reasonable use" are set forth in Section 15.22.100. Do to the difficult nature of what is and is not defined as a reasonable use makes it hard to define, which is why the decision is to be made by the hearing examiner. 24 4-Aug-26 Stakeholder Written Question status Asked whether the map is current or reflects the draft Critical Areas Ordinance updates. developed during the comprehensive plan periodic update and used existing critical areas designations, not the proposed draft CAO updates. Attachment B September 23, 2026 Planning Commission Regular Meeting 123 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 57 of 60 Comments - Government Agencies #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment Indicated that the proposed amendments and supporting materials generally look good and that the Critical Areas Checklist and public notice were useful. More detailed Comments were limited because the Geologically Hazardous Areas article has not yet been drafted. 2 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment professional Recommended retaining the existing critical-area-specific qualification requirements rather than replacing them solely with general language concerning licensure, training, and experience. Noted that the proposed general language does not specify Washington licensure and that the existing language provides greater clarity regarding professionals reviewing geologically hazardous areas. addressed accordingly. 3 14-Aug-26 Department of Natural Resources (DNR) Written Comment scientist Recommended adding a definition of “technical scientist” because the term is used in PAMC 15.22.030(A). Attachment B September 23, 2026 Planning Commission Regular Meeting 124 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 58 of 60 Comments - Government Agencies #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 4 14-Aug-26 Washington Department of Natural Resources (DNR) Written Question rating and classification Requested clarification of the rating categories used to classify critical areas and whether those categories correspond to known or suspected risk, no known risk, or unknown risk due to insufficient data. critical areas will be classified and rated based on the criteria of the subsection. Specific ratings will be based on the requirements of the applicable critical area as determined necessary by a qualified professional. 5 14-Aug-26 Washington Department of Natural Resources (DNR) Written Question Documentation of ratings Asked where City-determined critical- area ratings will be documented, including whether the information will be included in the permit or application record or recorded on the property title. the permit after a review of the application, as well as incorporated to any deed restrictions or title requirements. Specific protocols for ratings are outlined in the applicable critical area's article. 6 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment activities Recommended providing more specific requirements for reports or studies prepared by qualified professionals when critical-area permit review is required, or adding a cross-reference to the section containing those requirements. 15.22.090.B.2. 7 14-Aug-26 Department of Natural Resources (DNR) Written Comment Report Expressed support for the proposed mitigation, monitoring, maintenance, and financial-guarantee requirements. Attachment B September 23, 2026 Planning Commission Regular Meeting 125 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 59 of 60 Comments - Government Agencies #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 8 14-Aug-26 Department of Natural Resources (DNR) Written Comment requirements Recommended requiring critical-area reports to address stormwater management, grading and erosion, and the applicable factor of safety. in 15.22.120.B.2. 9 14-Aug-26 Department of Natural Resources (DNR) Written Comment Recommended requiring notice to be recorded on the title of all properties containing critical areas, rather than limiting the requirement to properties containing designated critical-area tracts. work with the City's Legal Department to ensure adequate languge is incorporated regarding a record on title. 10 14-Aug-26 Department of Natural Resources (DNR) Written Comment fencing Noted that fencing may or may not be necessary to delineate a critical-area tract and suggested allowing the requirement to be determined based on site conditions. 11 14-Aug-26 Department of Natural Resources (DNR) Written Comment identification and markings Expressed support for the proposed field-identification and marking requirements. 12 14-Aug-26 Department of Natural Resources (DNR) Written Comment Article to be drafted Noted that the Geologically Hazardous Areas article remains to be drafted and indicated an interest in reviewing the article when it becomes available. Attachment B September 23, 2026 Planning Commission Regular Meeting 126 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 60 of 60 Comments - Government Agencies #Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 13 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment natural resource lands Recommended considering references to the definition of geologically hazardous areas in WAC 365-190-120 and to the natural resource lands provisions in WAC 365-196-480 in the Comprehensive Plan, development regulations, Shoreline Master Program, or other applicable City documents. 14 14-Aug-26 Department of Natural Resources (DNR) Written Comment Recommended consulting the Washington Geologic Information Portal for current geologic information and mapping relevant to the City’s planning and regulatory work. 15 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment Recommended consulting the Washington Department of Natural Resources’ Geologic Planning resources during current or future Comprehensive Plan, development- code, Shoreline Master Program, and critical-area updates. Attachment B September 23, 2026 Planning Commission Regular Meeting 127 From:Lisa Hoffman To:Community and Economic Development Cc:City Clerk Subject:Public Comment on the Critical Areas Ordinance (CAO) Update Date:Thursday, September 10, 2026 7:16:55 AM [CAUTION - EXTERNAL EMAIL] Dear members of the City Council and Planning Commission, I am writing to formally log my strong opposition to the regulatory expansions requested by Deputy Mayor Navarra Carr during the August 25, 2026 city council work session regarding the Critical Areas Ordinance (CAO) updates. Specifically, I oppose proposals to blanketly prohibit development in critical areas, restrict industrial variances, and revive the overreaching standard of “net ecological gain.” Port Angeles is a historic blue-collar maritime community. Like many major, successful port cities across the Pacific Northwest-including Seattle, Tacoma, and Olympia-large portions of our active waterfront and downtown were intentionally built on artificial fill. This land was engineered specifically to serve as the economic backbone of our region. Treating our working, filled waterfront with the same restrictive regulations as an untouched, pristine wilderness ignores the reality of how our city was built and how it must function to survive. Our community is already struggling to recruit and retain sustainable businesses. Imposing aggressive environmental mandates that go far beyond state requirements will severely damage our local economy. If these proposals move forward, the resulting red tape will drive away future investment, stifle job creation, and hurt the families who rely on our working waterfront for their livelihoods. We cannot protect our future prosperity if we legally choke out our path to growth. While environmental stewardship is important, it must be balanced with economic reality. I urge the Planning Commission and City Council to reject Deputy Mayor Carr’s requests. Please maintain a balanced CAO that protects our environment without dismantling the marine businesses and industries that keep Port Angeles alive. Thank you for your time, consideration, and service to our community. Sincerely, Lisa Hoffman Attachment C September 23, 2026 Planning Commission Regular Meeting 128 Christopher H. Fidler Selecting native low-growing species permanently resolves view obstruction while still maintaining a tree canopy. Replacing declining or hazard trees prevents failures on the slope and Front Street, and diminishes the risk of damaging Red Lion buildings below and overhead power lines above. Replacing invasive or inappropriate species with deep-rooted native plants further secures the slope and prevents erosion. Attachment C September 23, 2026 Planning Commission Regular Meeting 129 I believe the positive impacts produced by unimpeded sightlines to the harbor and downtown waterfront district are enormous from the standpoint of civic pride and tourist attention (“stickiness”). However, such goals will never be realized if pursued as a piece- meal, ten-year, multiple-step, pruning exercise that halfway through loses supervisory and budgetary attention for other priorities and allows the existing vegetation to once again frustrate the view. Christopher H. Fidler Christopher H. Fidler Attachment C September 23, 2026 Planning Commission Regular Meeting 130 From:Dan Williams To:Community and Economic Development Subject:Public Comment on MCA 26-0090 — Lang Heritage Homes Date:Monday, September 21, 2026 9:48:10 AM [CAUTION - EXTERNAL EMAIL] Dear Planning Commissioners: Please include this comment and its attachments in the record for the September 23, 2026 public hearing on the proposed Critical Areas Ordinance, MCA 26-0090. I am developing Lang Heritage Homes on West 10th Street. The growing wetland and its buffers have impaired the buildable area of our four remaining Phase 1 lots. We have installed sewer capacity and electrical infrastructure intended to support additional homes, subject to approvals. I am attaching a wetland delineation map and ask the City to consider the stormwater records and chronology I have previously provided. An existing stormwater pipe is within immediate reach of the four remaining lots. Please evaluate whether a connection is feasible, including the pipe’s ownership, capacity, elevation, connection requirements, and any treatment needed. Please provide the City’s determination in writing. I also ask staff for a written, lot-by-lot determination showing the wetland boundary, rating, buffer, building setback, and resulting buildable area. Please explain what evidence is needed to evaluate whether an artificial-feature exclusion applies and how existing stormwater discharges will be assessed. The stormwater design grant application deadline is September 30, seven days after this hearing. Please state whether the City can take any action toward an application by that date. If it cannot, please provide a written design and funding path for addressing the drainage conditions affecting Lang Heritage Homes. Sincerely, Dan Williams Angeles Building Services Inc Port Angeles WA 98363 Lang Heritage Homes Attachment C September 23, 2026 Planning Commission Regular Meeting 131 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 1 MCA 26-0090 Exhibit 4 DATE: July 22, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 CAO Municipal Development Code Audit Questions and Responses SUMMARY In June 2026 staff presented an initial audit on current Title 15 municipal code amendment requirements related the 2025 Comprehensive Plan Periodic Update to the Planning Commission and Critical Areas Ordinance (CAO) Stakeholder Advisory Committee. During the discussion of necessary updates several clarifying questions were raised by the Commission and Committee. This memo serves to summarize those questions and provides guidance on what requirements from the state must be adopted in Title 15 of the municipal code (PAMC). The questions below are summarized and grouped by topic. Impact on Development, Housing Density, and Comprehensive Plan Goals Question 1: How might the proposed CAO amendments affect development capacity, housing goals, infill development, and Comprehensive Plan implementation? Staff Response: The proposed amendments will have minimal increased effects on development capacity, housing goals, infill development and Comprehensive Plan implementation. The existing CAO and environmental protections associated with PAMC Chapter 15.20 – Environmentally Sensitive Areas Protection will be modified to ensure that the protection standards meet the criteria defined by state agencies such as Washington Department of Fish and Wildlife and the Department of Ecology but will not go above and beyond those requirements. The City currently regulates development activities within the designated critical areas; this code update will evaluate whether the existing development standards continue to protect ecological functions and values and adjust those standards to September 23, 2026 Planning Commission Regular Meeting 132 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 2 MCA 26-0090 Exhibit 4 ensure no net loss where necessary. Amended protections may appear as adjusted buffer widths or the requirement of additional mitigation measures if impacts to critical areas cannot be avoided. Current science finds that wide terrestrial buffers, a near continuous corridor of mature, native vegetation, and limits on in-water projects are all necessary to protect salmonid habitat functions in riparian areas. Protection standards are addressed in existing code. Development capacity and housing goals will not be significantly affected by the proposed amendments. Question 2: Can you distinguish between screening-level GIS overlap and actual loss of buildable area? Staff Response: The GIS maps available from local, state and federal agencies act as the first screening for potential overlap identifying potential critical areas. If it is identified that a critical area may be located within a project site, During the development application process the applicant is responsible for demonstrating be boundaries of a critical area and its buffer. A professional consultant may be necessary to accomplish this task. As an example: If there is a proposal to build a structure on a property that is located adjacent to a steep slope (geologically hazardous area), a geotechnical engineer is required to perform an analysis of the parcel and develop a site map that identifies the location of the top of the ravine and any applicable buffers and building setbacks for that location. This professional reporting ensures the proposed development either does not encroach within the buffer or the provision of mitigation measures are in place to ensure no net loss of the ecological functions and values. Mapping tools planned for development and publishing during the implementation step of this code update will be explicit in stating that the tools are for screening purposes only. This communication is particularly important in the identification of existing wetlands throughout the City. Not all wetlands are currently delineated or mapped and those that are not may need to be delineated prior to development activities. Question 3: Can we evaluate the impacts of Title 15 by zoning, future land use, parcel size, vacant or underutilized status, and remaining buildable envelope? Staff Response: During the 2025 Comprehensive Plan Periodic Update, the City performed a land capacity analysis that incorporated the existing critical areas within the entirety of the Port Angeles UGA. While it is unknown how new buffer requirements will September 23, 2026 Planning Commission Regular Meeting 133 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 3 MCA 26-0090 Exhibit 4 affect the available building space on remaining developable parcels, the existing land capacity analysis can be a living document updated as critical areas and their associated buffers are delineated and mapped. Question 4: How can we ensure that every parcel intersected by a screening map is not characterized as having lost development capacity? Staff Response: In most scenarios, a landowner or developer could apply for what is called a “reasonable use exception” if the regulations set forth by the Critical Areas chapter would deny all use of a parcel. The Department of Commerce provides guidance on criteria that can be used for determining if a development application would qualify as a “reasonable use”: • No other reasonable economic use of the property has less impact on the critical area. • The proposed impact to the critical area is the minimum necessary to allow for reasonable economic use of the property. • The inability of the applicant to derive reasonable economic use of the property is not the result of actions by the applicant after the effective date of the regulation, or its predecessor. • The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site. • The proposal will result in no net loss of critical area functions and values consistent with the best available science. • The proposal is consistent with other applicable regulations and standards. Reasonable use exceptions provide a path forward that would allow for certain types of development to occur either within a critical area or its buffer, so long as it is only the minimal reasonable use of the property. This option does not limit development capacity in these areas but rather allows a path forward for a proposal if the development criteria are satisfied. Regulatory Compliance, Best Available Science, and Municipal Flexibility Question 5: What is legally required, what is best available science (BAS)-supported, and what remains a local policy or implementation choice? September 23, 2026 Planning Commission Regular Meeting 134 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 4 MCA 26-0090 Exhibit 4 Staff Response: The City is required to update the critical areas ordinance utilizing the best available science as provided by state agencies with expertise in their area as a part of the mandated Growth Management Act 10-year periodic update of the city’s Comprehensive Plan giving special consideration to anadromous fish species. Two examples of required best available science updates according to the recommendations from the state agencies are provided below: • Fish and Wildlife Habitat Conservation Areas – WDFW is the lead agency for advising local governments on matters related to the FWHCAs. Their guidance, established in Riparian Ecosystems, Vol. 2: Management Recommendations, is to delineate riparian corridors within one Site Potential Tree Height (SPTH) to protect the full riparian ecosystem functions and values. SPTH is defined as “the average maximum height of the tallest dominant trees (200 years or more) for a given site class”. “200 years or more” refers to the approximate minimum age of old-growth forests, which reflects the underlying assumption that old-growth forest conditions are needed for full riparian ecosystem functions. The City has some flexibility on management recommendations within these areas, however, those protection standards and management decisions must lead to the eventual establishment of old-growth forests within our riparian areas. • Wetlands – Wetland guidance comes from the Department of Ecology’s Wetland Guidance for CAO Updates, October 2022. In this document, the Department of Ecology summarizes the protection of wetland functions as: avoid, buffer, compensate and secure. This means: 1. Avoid direct impacts to a wetland and its buffer to the extent practicable by allowing impacts only when these is no reasonable alternative. 2. Buffer wetlands from impacts of adjacent land use through the retention of vegetated upland surrounding the wetland. 3. Compensate for unavoidable impacts by requiring the replacement of wetland and/or buffer area and function through the restoration, creation, preservation, and/or enhancement of wetlands and/or their buffers. 4. Secure long-term protection of wetlands and their buffer areas through legal mechanisms. Port Angeles has some flexibility is determining what type of wetland buffering are implemented. Department of Ecology provides three alternatives for wetland buffering; Option 1 sets the width of the buffer based only on the wetland category as determined September 23, 2026 Planning Commission Regular Meeting 135 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 5 MCA 26-0090 Exhibit 4 using the Wetland Rating System. This option provides the least amount of flexibility because it doesn’t take into account the potential impacts from land use, or the wetland’s functions. Option 2 sets the width of the buffer based on the wetland category and the intensity of the impacts from the proposed land use. For example, if a wetland is rated as a Category III wetland per the Wetland Rating System, but the potential impact on the wetland would be low, the buffer width would be set at 75 feet as compared with a land use that would have high impact on the wetland, which would require a 150-foot buffer. Option 3 provides the most flexibility. It sets the buffer width based on the Wetland Category, the potential impact the land use has on the wetland, and the wetland functions or special characteristics as determined through the rating system. If it is determined that the City selects option 2 or 3, there also lies some flexibility with determining which land uses would be classified as having low, moderate, and high impact. Another example of local policy is how an application is reviewed. Title 18.02 PAMC provides a permit “typing” system that determines the level of review, permit timing, and the responsible decision-maker. Procedures developed in this code amendment process will define certain allowed uses, exemptions, reasonable uses, and their associated permit and review types and timelines. Question 6: How does local knowledge, site-specific information, and professional judgement remain part of the review process? Staff Response: A professional assessment of the project site may be required by a qualified professional depending on the type of development proposed and the critical area that it impacts. That report is submitted as a part of a development permit application. The responsibility to demonstrate whether 1) critical areas are present or not, 2) any proposed development on a parcel that contains a critical area or its buffer will result in no net loss of functions and values, and 3) that any impacts to critical areas will be mitigated according to a mitigation plan lies with the applicant. Staff is responsible for reviewing the materials provided by the applicant and using local knowledge and expertise to determine if the reports and materials provided are accurate and representative of the parcels identified. Question 7: What is the correct wetland terminology? Staff Response: “Wetland” or “wetlands” means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that September 23, 2026 Planning Commission Regular Meeting 136 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 6 MCA 26-0090 Exhibit 4 under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. Wetlands may include those artificial wetlands intentionally created from non-wetland areas created to mitigate conversion of wetlands.” Question 8: Can the city compare Department of Ecology buffer options before recommending a final approach? Staff Response: A decision can be made on which wetland buffering option the city implements. The setbacks listed in each of the three options are not negotiable unless the city can produce its own documentation and analysis beyond the state’s existing BAS that meets or exceeds documented BAS. Please refer to the Wetland Buffering Analysis staff memo for more information on this topic. Private Property Burdens, Mapping Discrepancies, and Cost Impacts Question 9: Can you provide clarity around affected parcels, private property impacts, applicant costs, and City costs? Staff Response: Affected parcels and impacts to private property will be updates in the City’s GIS maps throughout this process. The impacts to private property will remain relatively the same, with the exception of any increased buffer widths that will be adopted based on the best available science. Regardless of the presence of a critical area on a parcel, a landowner or developer may apply for a critical area reasonable use exception or critical area variance if the proposed evaluation criteria are met. Application costs are determined in the City’s Master Fee Schedule. Costs associated with necessary environmental reporting vary depending on the qualified professional selected by the landowner. Question 10: Can staff clarify how public maps are used as screening tools and should not be used as final regulatory determinations? Staff Response: Amendments to the CAO include the addition of identification, classification, and rating of critical areas, which are not currently well-defined in current September 23, 2026 Planning Commission Regular Meeting 137 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 7 MCA 26-0090 Exhibit 4 code. Proposed PAMC Section 15.22.030.A will clearly define the use of critical areas maps and what purpose they serve as screening tool to identify the potential location of critical areas. Proposed PAMC Section 15.22.030.B will require that actual site conditions must be determined through the performance of a field investigation as performed by a qualified professional. Question 11: Can staff address City, County, State, Federal, and consultant mapping discrepancies. Staff Response: Because each jurisdiction is responsible for managing it’s own GIS maps, there are existing discrepancies between various agencies. The City’s GIS mapping tool should be used for screening purposes first by both city staff and property owners investigating the development potential of a specific property in Port Angeles. The actual location of critical areas should be confirmed in the field during any development application process to officially determine if there is a critical area onsite. A delineation performed by a qualified professional and submitted to the City along with their proposal for development will be added to the City’s CAO GIS database. Because each agency providing CAO mapping has different staff capacity and documentation procedures, the time in which a submitted CAO survey is mapped can vary. The implementation step in the CAO code amendment workplan will establish procedures to better map existing and submitted CAO surveys for staff and public use. Question 12: Will applicants be responsible for offsite or landscape-scale analysis? Staff Response: Offsite or landscape-scale analysis will primarily be done as part of the reporting requirements, to be performed by a qualified professional. Implementation of mapping procedures will assist qualified professionals in determining larger landscape scale impacts. Exemptions, Appeals, and Practical Environmental Definitions Question 13: How are wetlands identified and when do mapped features require review? Staff Response: According to the definition provided by Department of Ecology wetlands are areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands September 23, 2026 Planning Commission Regular Meeting 138 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 8 MCA 26-0090 Exhibit 4 generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. Wetlands may include those artificial wetlands intentionally created from non-wetland areas created to mitigate conversion of wetlands. They are identified by a qualified professional, either a Wetland Professional, Wetland Professional in Training, or a biologist who has received training from the Washington Department of Ecology for Wetland Identification and Rating. When looking at whether or not an area is or could be a wetland, the professional will first perform a wetland assessment, where they will look at the soil types, existing vegetation, and presence or absence of saturated soils. The area being assessed must meet the specific criteria set forth in the identification and rating system established by Ecology to be classified, identified, and delineated as a wetland. Question 14: How are artificial or inadvertently created wetlands delt with? Staff Response: Inadvertently create wetlands are not defined as a wetland or wetlands. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway, The burden of proof remains with the landowner or developer to clearly demonstrate a wetland is artificial or inadvertently create. If it is found that the area would be classified as an artificial wetland as described above, then wetland-related critical area regulations would not apply. Question 15: Would previously platted properties qualify for transition provisions or exemptions if wetlands were found on site where none previously existed during the time of the original plat? Staff Response: The only inadvertently created wetlands that would be exempt from the provisions of the ordinance would be those that are created from non-wetland sites as described above in Question 15. The burden of proof is on the developer or landowner to demonstrate how those areas were created to the City. Previously platted property having not shown a wetland may still establish a functional wetland over time. This situation does not automatically exempt those properties from the wetland regulations set forth by the September 23, 2026 Planning Commission Regular Meeting 139 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 9 MCA 26-0090 Exhibit 4 City. Question 16: How are piped streams and previously modified corridors evaluated? Staff Response: Several of the City’s urban stream corridors are currently culverted under vast stretches of roads and other land uses. In these heavily urbanized areas, it is important to consider the existing conditions to understand where opportunities may occur to protect whatever functions currently exist. In the case of culverted streams, keeping the potential open for habitat improvement and restoration down and upstream of the culvert and allowing for future daylighting projects are one way to address the current lack of function for those portions of the streams. Taking a more holistic approach and a landscape-scale view of the entire stream corridor involves not just looking at the lack of functions or values of segments. A key element to maintaining these urbanized riparian management zones is connectivity, both in and along streams. WDFW has many recommendations for urban riparian ecosystems that will be evaluated as the proposed code is further developed to include fish and wildlife habitat conservation areas. Question 17: Clarify appeal procedures and how conflicting expert opinions are resolved. Staff Response: Appeals for any decision will be consistent with PAMC Title 18, Article V, Sections 18.02.220 and 18.02.230. References: WA Department of Fish and Wildlife Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (https://wdfw.wa.gov/sites/default/files/publications/01987/wdfw01987.pdf) WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA Department of Transportation and WA Department of Fish and Wildlife, Washington Habitat Connectivity Action Plan (https://wdfw.wa.gov/sites/default/files/publications/02630/wdfw02630.pdf) WDFW Riparian Management Zone Checklist for Critical Areas Ordinance – Addendum (https://wdfw.wa.gov/sites/default/files/2023-08/rmr-cao-checklistaddendum.pdf) September 23, 2026 Planning Commission Regular Meeting 140 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 10 MCA 26-0090 Exhibit 4 Attachments: Attachment A: 2025 Land Capacity Analysis September 23, 2026 Planning Commission Regular Meeting 141 MCA 26-0090 Exhibit 5 MCA 26-0090 Phase 2 Introduction Memo Page 1 DATE: May 27, 2026 TO: Planning Commission FROM: Planning Division RE: Planning Commission Phase 2 Introductory Memo SUMMARY Washington’s Growth Management Act (GMA) requires all cities and counties to designate and regulate “critical areas”, which are defined as wetlands, critical aquifer recharge areas used for potable water, fish and wildlife habitat conservation areas, frequently flooded areas, shorelines, and geologically hazardous areas. Critical areas perform key functions that enhance our environment and protect us from hazards, such as landslides, tsunamis, and floods. The many beneficial functions and values these areas provide include but are not limited to, water quality protection and enhancement, fish and wildlife habitat, flood storage, conveyance, and the slow release of flood waters, groundwater recharge and discharge, erosion control, and wave attenuation. Critical areas protection is essential to protect the public’s health and safety and is necessary to comply with state laws in Washington. The City of Port Angeles is required to update its Critical Areas Ordinance (CAO) in accordance with the state-mandated Comprehensive Plan Periodic Updates under the GMA. The proposed code updates are scheduled to be completed in accordance with state requirements prior to the end of 2026. A more detailed schedule is provided in this memo as Attachment 1. Phase 2 provides the City with an opportunity to ensure existing regulation meets protection standards and incorporates best available science as provided by state agencies such as Washington Department of Fish and Wildlife, Department of Ecology, and Washington Department of Natural Resources. These code updates provide the Planning Commission with the opportunity to assist staff in an in-depth audit and reorganization of the existing Title 15 of the Port Angeles Municipal Code (PAMC). The proposed updates will seek to reorganize and consolidate regulations to improve clarity and readability for internal and external users of the code. BACKGROUND AND PROJECT SCOPE Under the GMA (RCW 36.70.a) all cities and counties in Washington State are required to update their Comprehensive Plan in a 10 year cycle. Updates to the CAO is an additional requirement that ensures all state legislative requirements involving critical area protections and regulations during the previous 10-year period are incorporated into local municipal code regulations. The CED team also views this mandate as an opportunity to ensure Title 15 permitting and environmental compliance procedures match those of larger and more advanced municipalities in Western Washington . The proposed update will include a comprehensive audit and reevaluation of existing codes within Title 15 by the Planning Commission, consolidating critical areas review procedures and ensuring the code includes updates best available science and best management practices. September 23, 2026 Planning Commission Regular Meeting 142 MCA 26-0090 Exhibit 5 MCA 26-0090 Phase 2 Introduction Memo Page 2 This code updated process began in April with a series of internal interdepartmental kick-off meetings to bring departments together and raise awareness of the goals and objectives of these code updates. The draft Goals and Objectives are included in this memo as Attachment 2. Interdepartmental coordination is essential for regulatory consistency and transparency and provides members of the development review team an opportunity to provide feedback on current permit review and areas that need improved clarity and simplify permitting processes. Title 15 currently generally labels Critical Areas as “Environmentally Sensitive Areas”. A main goal of this code update is to reduce confusion of both staff members and applicants, and to bring the City up to the standards used elsewhere in Washington State, where these areas are clearly defined as “Critical Areas”. For example, our stream ravines and marine bluffs are currently classified as “locally unique features”, when in fact, they should be defined as “geologically hazardous areas” based on their soils and slope. Geologically hazardous areas are one of the five Critical Areas as defined by WAC 365-190-030, along with wetlands, critical aquifer recharge areas, fish and wildlife habitat conservation areas, and frequently flooded areas. An analysis of thirteen (13) similar jurisdictions’ environmental code was performed to find a structure that allowed for the most clarity and simplicity. The layout and organization of the City of Anacortes provided the best structure for the proposed Title 15 Chapter and Sections. The proposed draft code structure is included in this memo as Attachment 3. The new code structure will maintain existing chapters of code relevant to the State Environmental Policy Act (SEPA), as well as the recently updated Flood Damage Prevention chapter that is proposed to be referenced in the Frequently Flooded Areas article of the Critical Areas Chapter. General definitions will be consolidated to a central chapter for easy reference, and general and administrative provisions will be clearly defined. Each critical area will receive their own article where specific identification methods, protection standards, and mitigation requirements will be clearly outlined. The Phase 2 update provides the City with an opportunity to develop a new chapter consolidating tree planting and maintenance regulations into a new Urban Forestry chapter. The chapter will enact recently adopted goals and policies set forth in the Climate Resiliency Plan, Strategic Plan, and the newly updated 2025 Comprehensive Plan related to ensuring a healthy urban forest. This phase is also taking place coincidentally with a project to develop an Urban Forestry Program that includes a citywide canopy and stream assessment. Implementation of the code will consist of the development of training and educational resources, a new dedicated city webpage for environmental programs and urban forestry to be made publicly available for residents, developers, and staff regarding best management practices and development standards in and adjacent to critical areas. This final step in the update process will commence as code updates move to City Council adoption. Materials will be made available on the City’s website and in City Hall. ATTACHMENTS Attachment 1 – CAO Update Workplan September 23, 2026 Planning Commission Regular Meeting 143 MCA 26-0090 Exhibit 5 MCA 26-0090 Phase 2 Introduction Memo Page 3 Attachment 2 – CAO Update Goals and Objectives Attachment 3 – CAO Proposed Title Organization Attachment 4 – Department of Commerce CAO Regulation Checklist and Guidance September 23, 2026 Planning Commission Regular Meeting 144 DATE: June 24, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Fish and Wildlife Habitat Analysis SUMMARY Existing Port Angeles Municipal Code (PAMC) Chapter 15.20 is reasonably strong at protecting individual habitat sites, but modern Washington Department of Fish and Wildlife (WDFW) Best Available Science (BAS) has shifted toward protecting ecological networks, connected populations, and landscape-scale ecosystem processes. That shift creates the most significant and defensible gaps between Chapter 15.20 and current fish and wildlife habitat science. Table 1 provides an overview of the various environmental protections standards set by the Washington Department of Fish and Wildlife, specific to their Priority Habitats and Species (PHS) list. Through this analysis, existing code was evaluated for consistency with the BAS found in the WDFW Riparian Ecosystems, Volume 2: Management Recommendations. Topics that were rated as having “strong” consistency were present throughout existing code and will require minimum amendments to meet BAS requirements. No recommendations for next steps have been provided for items with strong consistency because no next steps are necessary. “Potential Deficiency” was identified as being present in existing code but may need some updates to meet BAS standards. “Moderate Deficiency” was identified as lacking in context and “significant deficiency” was either missing entirely or was only mentioned but did not contain significant protection standards for protection. This analysis will be the driving factor for targeting those deficiencies as described below, with heavy emphasis on the significant and moderate deficiencies. Potential deficiencies will be addressed if needed, and those with strong consistency with BAS will be amended to improve clarity and readability if needed. Many of the topics identified under this analysis apply to protection standards that can be used for other critical areas, such as geologically hazardous areas and frequently flooded areas as these areas frequently overlap in our region. Critical Aquifer Recharge Areas, while mentioned as an environmentally sensitive area in current regulation, have no development standards associated with them, and were not analyzed. Moving forward, if MCA 26-0090 Exhibit 6 September 23, 2026 Planning Commission Regular Meeting 145 Port Angeles chooses to shift towards utilizing groundwater as a potable water source, it would be wise to include development standards and protection of these areas in this code update. Table 1: Gap Analysis by Environmental Protection Consideration | Source – WDFW Riparian Ecosystems, Vol. 2 Management Recommendations. HABITAT CONNECTIVITY, WILDLIFE CORRIDORS, AND LANDSCAPE SCALE CONSERVATION Analysis: One of WDFW's most explicit planning priorities is maintaining viable, connected populations over the long term through habitat and wildlife connectivity. WDFW's PHS program treats connectivity as a foundational conservation principle rather than an optional consideration. Chapter 15.20 currently recognizes: •fish habitat, •wildlife habitat, Environmental Topics BAS Consistency Observation Priority Species Protection Strong Present Protection Potential Deficiency Present Significant Deficiency Core BAS Principle Significant Deficiency Core BAS Principle Conservation Significant Deficiency Core BAS Principle Moderate Deficiency Explicit Goal Protection Potential Deficiency Special Consideration Required Moderate Deficiency Increasing BAS Emphasis Potential Deficiency Recommended Significant Deficiency Increasingly Incorporated in newly adopted CAOs MCA 26-0090 Exhibit 6 September 23, 2026 Planning Commission Regular Meeting 146 •stream corridors, •riparian habitat, •priority species habitat. The code primarily protects habitat as discrete sites with no requirements to evaluate: •corridor function, •habitat linkage areas, •wildlife movement pathways, •fragmentation effects, •migration routes, •dispersal corridors, •breeding movement pathways, •connectivity between habitat patches, •landscape permeability. Deficiency or Concern: This is the largest BAS gap in the entire chapter, as it relates to multiple management strategies and protection standards. Current environmentally sensitive area provisions protect habitat patches but lacks standards for identifying, maintaining, or restoring habitat connectivity necessary to support viable wildlife populations and movement across the landscape. The objective is to maintain functioning ecological systems rather than isolated habitat fragments. Chapter 15.20 PAMC largely assumes habitat can be protected by protecting the immediate site. Modern BAS indicates that many species decline even when habitat patches remain intact if movement pathways are severed. The chapter does not provide regulatory mechanisms for preserving wildlife movement corridors despite substantial scientific evidence that connectivity is necessary for long-term population persistence. Recommendations: Suggested edits would include the development of a monitoring and adaptive management program to ensure goals, policies and regulations are effectively protecting these areas. The establishment of a monitoring system would allow the City to better determine if protection standards lead to habitat connectivity and wildlife corridor preservation in the long-term. Systems need to be viewed as a whole rather than fragmented across the landscape, and development standards need to be updated to reflect the BAS as provided by WDFW. Wildlife corridors are closely related to habitat connectivity. The proposed code could reference the Washington Habitat Connectivity Action Plan to find specific recommendations for improving connectivity across the landscape. MCA 26-0090 Exhibit 6 September 23, 2026 Planning Commission Regular Meeting 147 Landscape-scale protection measures should incorporate full protection within one SPTH, identified using the site potential tree height (SPTH) mapping tool. This will protect Riparian Management Zones at the landscape scale, rather than on a parcel-by-parcel level, even if applications are reviewed on a parcel level. Additional recommendations for landscape- scale habitat conservation should utilize the Washington Habitat Connectivity Action Plan. While the City of Port Angeles alone may be too small to consider Landscape-Scale Habitat Conservation, efforts should be made to think about how the City connects to the UGA, and therefore the County, as well as the proximity to the landscape to the South (Olympic National Park). POPULATION VIABILITY Analysis: A major objective of the Priority Habitat Species program is maintaining healthy populations over time rather than simply preventing local habitat destruction. WDFW explicitly references maintaining or enhancing populations within current and historic ranges. The ordinance protects habitat but does not appear to require evaluation of whether: •local populations remain viable, •breeding populations remain connected, •cumulative habitat loss threatens population persistence. Deficiency or Concern: Habitat protection is treated as an end in itself rather than a means of sustaining populations. Chapter 15.20 PAMC lacks mechanisms for evaluating whether habitat protection results in viable populations of fish and wildlife. Recommendations: The establishment of a monitoring and adaptive management program would allow the City to evaluate whether the protection measures established are sufficient to maintain viable fish and wildlife populations over the long term. Without a monitoring program, there is no way to track viable populations. This would be a good opportunity to partner with local organizations who focus on habitat recovery in our region, as many of them already have monitoring programs in place. RIPARIAN HABITAT PROTECTION Analysis: Modern WDFW science views riparian habitat as ecological systems rather than simply stream buffers and places enormous emphasis on riparian functions such as: •shade, •large woody debris recruitment, •nutrient inputs, •bank stability, MCA 26-0090 Exhibit 6 September 23, 2026 Planning Commission Regular Meeting 148 •floodplain interaction, •wildlife movement. Chapter 15.20 PAMC contains protective guidance regarding: •stream temperature, •sedimentation, •woody debris recruitment, •streambank stability, •aquatic habitat. Deficiency or Concern: The code recognizes riparian functions but does not fully incorporate more recent riparian ecosystem science emphasizing: •floodplain connectivity, •riparian ecosystem processes, •site-potential tree height concepts, •watershed-scale function. Riparian protections generally align with BAS but do not fully incorporate modern riparian ecosystem management approaches developed since ordinance adoption. Recommendations: Protection standards will need to be updated to reflect BAS, specifically for maintaining riparian ecosystem processes using SPTH. This science can be applied to multiple critical areas protection standards, including geologically hazardous areas, fish and wildlife habitat conservation areas, and critical aquifer recharge areas. Full protection within one SPTH as determined by using the SPTH mapping tool is recommended. The City’s GIS layers will be updated through implementation to align with the SPTH map, primarily for fish and wildlife habitat conservation areas, and geologically hazardous areas, as the two generally overlap. ANADROMOUS FISH Analysis: Under the Growth Management Act, local governments must give special consideration to habitat associated with anadromous fisheries. WDFW repeatedly emphasizes salmonid habitat protection. The chapter contains extensive findings regarding: •spawning habitat, •fish eggs, •stream temperatures, •sedimentation, •aquatic habitat. MCA 26-0090 Exhibit 6 September 23, 2026 Planning Commission Regular Meeting 149 Deficiency or Concern: The code generally addresses salmonid concerns but predates many advances in salmon recovery science and recognizes salmonid habitat functions in the findings of the chapter. It does not fully incorporate current watershed-based salmon recovery strategies. Recommendations: Anadromous fish habitat includes the nearshore marine ecosystem, Port Angeles Harbor, and the six urban stream corridors found within the City. The protection and enhancement of these areas will involve incorporating management practices for anadromous fish habitat to be pulled from the WDFW Riparian Ecosystems, Volume 2: Management Recommendations. No net loss of ecological functions or values will be the foundational pillar for determining which management practices are included in development standards for all fish and wildlife habitat conservation areas, including habitat for anadromous fish. CUMULATIVE IMPACTS Analysis: Modern habitat science increasingly recognizes cumulative degradation as a major driver of species decline. The current ordinance is largely permit- and project-based with little evidence for requirements for: •cumulative habitat accounting, •cumulative fragmentation analysis, •watershed-level degradation assessments. Deficiency or Concern: The ordinance lacks procedures for evaluating cumulative habitat losses and fragmentation effects resulting from multiple development actions over time. Recommendations: Through the development of a monitoring and adaptive management program, the City will be able to better manage for the cumulative effects of habitat degradation and protection. Noting that fragmented landscapes lead to cumulative habitat loss, the best way to monitor the efforts of critical areas protection is through a monitoring and adaptive management program. Adaptive management relies on scientific methods to evaluate how well regulatory and nonregulatory actions achieve their objectives, and adjusts those programs accordingly. CLIMATE RESILIENCE Analysis: Although not prominent in the original PHS manuals, current WDFW conservation planning increasingly considers: •climate adaptation, MCA 26-0090 Exhibit 6 September 23, 2026 Planning Commission Regular Meeting 150 •shifting species distributions, •drought impacts, •thermal refugia, •resilience corridors. There is currently no mention or guidance on climate resiliency, hazard mitigation or adaptation provisions in Chapter 15.20 PAMC. Deficiency or Concern: The ordinance predates the City’s current Climate Resiliency Implementation Plan. The ordinance does not address climate-driven changes in habitat conditions, species distributions, hydrology, or ecosystem resilience. Recommendations: Incorporate climate-related specifics in the findings and purpose of the chapter. These can be pulled from the Climate Resiliency Action Plan as well as the Climate Resiliency and Hazard Mitigation Element of the 2025 Comprehensive Plan. Management strategies should also reflect BAS to protect and restore ecosystems to increase the resilience of species, habitats, and communities to climate change. Guidance from the Department of Commerce on Climate Resiliency efforts should be incorporated into the regulations and standards to ensure concurrency with long range environmental planning efforts. References: WA Department of Fish and Wildlife Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (https://wdfw.wa.gov/sites/default/files/publications/01987/wdfw01987.pdf) WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA Department of Transportation and WA Department of Fish and Wildlife, Washington Habitat Connectivity Action Plan (https://wdfw.wa.gov/sites/default/files/publications/02630/wdfw02630.pdf) WDFW Riparian Management Zone Checklist for Critical Areas Ordinance – Addendum (https://wdfw.wa.gov/sites/default/files/2023-08/rmr-cao-checklistaddendum.pdf) MCA 26-0090 Exhibit 6 September 23, 2026 Planning Commission Regular Meeting 151 DATE: June 24, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Wetlands Analysis SUMMARY In 2017, the City amended Port Angeles Municipal Code (PAMC) Chapter 15.24 - Wetlands to expressly adopt the Washington Department of Ecology wetland rating system requiring the use of the latest Ecology rating procedures. Specifically, Chapter 15.24.040(D)(3) PAMC states that the City "shall apply the latest version" of Ecology's Wetland Rating System and Field Methodology. In auditing the chapter using the Department of Ecology Wetland Guidance for Critical Areas demonstrated that there are still several areas where the code appears to be vulnerable from a Best Available Science (BAS) perspective. The strongest argument is that the current ordinance remains largely site-scale and project-scale, while contemporary wetland BAS increasingly requires protection of landscape-scale ecological processes, particularly habitat connectivity, cumulative impacts, and long-term resilience. Those are the areas where the gap between the ordinance and current science are most pronounced and will be the primary focus of the amendments moving forward. Any consistency that was found to be “Strong” was not analyzed further as no recommended changes were deemed necessary. “Moderate” deficiencies contain some standards that are still relevant, but do not reflect current science in its entirety. “Significant” deficiencies are either lacking entirely from the ordinance or are present but do not meet current standards. Those deficiencies that were identified as significant will have the most recommendations for amendments moving forward, with moderate deficiencies requiring minimal amendments to meet current standards. MCA 26-0090 Exhibit 7 September 23, 2026 Planning Commission Regular Meeting 152 Environmental Topic BAS Consistency Observation Ecology Rating System Adoption Strong City adopts Ecology rating system. Mitigation Sequencing Strong Avoidance → minimization → rectification → compensation hierarchy is incorporated. Delineation Standards Strong Uses Ecology delineation manual. Functional Assessment System Moderate Deficiency Local methodology retained alongside Ecology system. Wetland Buffers Moderate Deficiency assumptions and not clearly tied to Ecology's current buffer framework. Habitat Connectivity Significant Deficiency Climate Resilience Significant Deficiency Mitigation Deficiency than current functional assessment tools Category I Wetlands Deficiency Cumulative Impacts Significant Deficiency Little discussion of cumulative effects Table 1: Best Available Science Gap Analysis | Source: Department of Ecology Wetland Guidance for Critical Areas (2022). FUNCTIONAL ASSESSMENT SYSTEM Analysis: The most obvious BAS issue is in Section 15.24.045 PAMC. Although the City adopts Ecology's rating system, it simultaneously retains a local hydrology classification framework (Type 1, Type 2, Type 3, etc.) and a locally developed functional assessment methodology intended to align with Clallam County's approach. Wetlands are classified based on hydrology types and local habitat criteria in addition to Ecology's categories. Section 15.24.045 PAMC evaluates: • habitat diversity, • habitat types, • adjacent upland conditions, • documented species use, • management modifications. However, the 2014 Ecology Wetland Rating System places much greater emphasis on: MCA 26-0090 Exhibit 7 September 23, 2026 Planning Commission Regular Meeting 153 • landscape position, • watershed connectivity, • habitat corridors, • adjacent habitat integrity, • landscape context. Deficiency or Concern: Current wetland science increasingly recognizes that wetland value is strongly influenced by landscape-scale relationships rather than solely on-site conditions. The Port Angeles code appears largely parcel-oriented. The 2014 Ecology Wetland Rating System was specifically developed to replace many locally developed functional assessment methods because: • ratings are calibrated statewide, • functions are scored consistently, • buffers are linked to ecological performance, • habitat scores are standardized. A Growth Management Hearings Board challenge could argue that retaining parallel local functional assessment methods introduces subjectivity and potentially departs from Ecology's scientifically vetted methodology. Recommendation: Remove the City’s Local Functional Assessment System (15.24.045), adopt the state’s 2014 Wetland Rating System as the standard for functional assessments moving forward, and focus more on the science provided by Ecology that focuses on landscape-scale relationships. WETLAND BUFFERS Analysis: Port Angeles does use Category I-IV wetlands and applies associated buffer standards. However, the code largely relies on fixed regulatory categories and does not appear to require a project-specific analysis of: • landscape connectivity, • amphibian movement, • species-specific habitat requirements, • ecological network integrity. Chapter 15.24 PAMC protects wetlands primarily through category-based buffer assignments rather than through a comprehensive evaluation of habitat-function and connectivity considerations reflected in Ecology's current wetland rating methodology. MCA 26-0090 Exhibit 7 September 23, 2026 Planning Commission Regular Meeting 154 Deficiency or Concern: Existing buffer widths do not meet the current standards as defined in July 2018 Modified Habitat Score Ranges. Recommendation: Update the buffer standards using the Buffer Alternative 3 method as outlined in the July 2018 Modified Habitat Score Ranges prepared by the Department of Ecology. This method determines the buffer width based on the wetland category, intensity of impacts, wetland functions, or special characteristics. Table 2 shows the existing buffer regulations under PAMC and the recommended buffer widths following Buffer Alternative 3. Wetland Category Current Buffer Widths by Intensity Buffer Alternative 3 Widths by Intensity Category I Low Intensity - 200 ft High Intensity - 300 ft 150 ft Medium Impact - 225 ft High Impact - 300 ft Category II 100 ft High Intensity - 200 ft 150 ft Medium Impact - 225 ft High Impact - 300 ft Category III Low Intensity - 50 ft High Intensity - 100 ft 75 ft Medium Impact - 110 ft High Impact - 150 ft Category IV Low Intensity - 25 ft High Intensity - 25 ft 25 ft Medium Impact - 40 ft High Impact - 50 ft Table 2: Buffer Widths Analysis using Buffer Alternative 3 method, by intensity. For the purposes of buffer determination, land use intensity ratings must be established. Currently, the City does not define land use intensity ratings for buffer requirements, which can lead to subjective decisions being made. Examples of some proposed land uses associated with each intensity rating are listed below. High Intensity – Commercial, Industrial, Residential development with >1 unit/acre, High- intensity Recreation. Medium Intensity – Residential development <1 unit/acre, moderate-intensity open space, paved trails, utility corridors with ongoing maintenance needs. Low Intensity – Low-intensity open space, unpaved trails, utility corridors with little or no vegetation management needs. MCA 26-0090 Exhibit 7 September 23, 2026 Planning Commission Regular Meeting 155 HABITAT CONNECTIVITY Analysis: The current Wetlands chapter lacks any explicit reference to habitat connectivity standards. Modern ecology guidance and peer-reviewed wetland science emphasize: • wildlife movement corridors, • connected wetland complexes, • amphibian migration routes, • salmon-supporting wetland networks, • regional biodiversity connectivity. Chapter 15.24 PAMC discusses habitat functions but there are no requirements for evaluating: • corridor fragmentation, • connectivity loss, • barrier effects, • regional habitat network degradation. Deficiency or Concern: This is one of the strongest BAS deficiencies because connectivity science has advanced substantially since many portions of the chapter were originally written. Recommendation: Modify reporting requirements to include habitat connectivity science in order to better evaluate fragmentation, connectivity loss and regional habitat network degradation from development. CLIMATE RESILIENCY Analysis: Climate resiliency and hazard mitigation are entirely absent, and the code provides no references to: • climate adaptation, • changing hydrology, • sea-level rise, • drought resilience, • increased storm intensity, • carbon sequestration functions. Deficiency or Concern: While Chapter 15.24 PAMC predates much of Washington's climate-resilience guidance, modern BAS increasingly identifies wetlands as critical climate infrastructure. This is becoming a common criticism of older critical areas ordinances. MCA 26-0090 Exhibit 7 September 23, 2026 Planning Commission Regular Meeting 156 Recommendation: Incorporate into the purpose the importance of wetland protection from a climate resiliency standpoint. Existing plans and policies point to their importance; the integration just needs to happen to align protections standards. MITIGATION Analysis: Section 15.24.070 PAMC relies heavily on: "best professional judgment of a qualified wetland ecologist" for determining functional replacement and mitigation success. Deficiency or Concern: Modern Ecology guidance increasingly favors: • standardized function assessment, • watershed-based mitigation planning, • mitigation banking, • in-lieu fee programs, • measurable performance standards. Reliance on professional judgment alone may create inconsistency. Recommendation: Provide guidelines for the “professional judgement” and reporting requirements that reflect the above concerns. Stricter reporting requirements for mitigation plans that meet current standards should be integrated. CATEGORY I WETLANDS Analysis: Ecology's 2014 rating system places strong emphasis on wetlands that are: • difficult to replace, • rare, • exceptionally high functioning, • of high conservation value. Port Angeles recognizes Category I wetlands, but much of the ordinance language still reflects the older "replace equivalent functions" framework rather than explicitly acknowledging that some wetlands cannot realistically be replaced. Deficiency or Concern: Replacement-based mitigation is often scientifically controversial for mature forested wetlands and rare wetland systems, such as those that meet the criteria of Category I and II wetlands. Recommendation: Update the wetland categories, especially Category I and II wetlands to reflect the current wetland types that are used by Ecology, and protection standards for MCA 26-0090 Exhibit 7 September 23, 2026 Planning Commission Regular Meeting 157 both that highlight their importance. Update the buffer requirements for Category I and II as defined in Table 2 to ensure the wetlands and their buffers remain intact. CUMULATIVE IMPACTS Analysis: The chapter is heavily focused on individual permit impacts. No comprehensive requirement to evaluate: • incremental wetland losses, • cumulative watershed degradation, • regional habitat fragmentation, • multiple buffer reductions, • repeated minor encroachments. Deficiency or Concern: Washington courts and Growth Management Hearings Boards increasingly recognize cumulative impacts as a BAS consideration. The code primarily evaluates project-by-project effects. Recommendation: Update the reporting requirements to include the cumulative impacts of development. Include mapping language and other ways of tracking and monitoring watershed degradation and incremental wetlands losses. Set the baseline for monitoring into the future. References: WA Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates (https://apps.ecology.wa.gov/publications/documents/2206014.pdf) WA Department of Ecology Washington State Wetland Rating System for Western Washington (https://apps.ecology.wa.gov/publications/documents/1406029.pdf) WA Department of Ecology Wetlands in Washington State Vol. 2: Guidance for Protecting and Managing Wetlands, July 2018 Modified Habitat Score Ranges (https://apps.ecology.wa.gov/publications/parts/0506008part3.pdf) WA Department of Ecology Characterizing Wetland Buffers in Washington State (https://apps.ecology.wa.gov/publications/documents/1706008.pdf) MCA 26-0090 Exhibit 7 September 23, 2026 Planning Commission Regular Meeting 158 DATE: August 26, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Wetlands Buffer Options Analysis SUMMARY In June 2026 staff presented an initial audit on current Title 15 municipal code amendment requirements related to the 2025 Comprehensive Plan Periodic Update to the Planning Commission and Critical Areas Ordinance (CAO) Stakeholder Advisory Committee (SAC). Several clarifying questions were raised specific to wetland buffering regulations. Current best available Science from the Washington Department of Ecology provides three options for setting the widths of wetland buffers. •Buffer Alternative 1 sets a fixed width based only on the wetland category. o Strengths: Very simplified buffering that does not require much analysis by staff. o Weaknesses: Provides very little flexibility. With no consideration to the potential impact of the proposed use, a single-family home would have the same buffer requirements as a large industrial building adjacent to the same wetland. All buffer widths would increase for all wetland categories, regardless of the intensity of the use. •Buffer Alternative 2 sets the width based on wetland category and the intensity of impacts from proposed changes in land use, providing some flexibility. A comparison of the existing buffer regulations and Buffer Alternatives 1 and 2 can be seen in Table 1. o Strengths: Provides more flexibility when it comes to setting buffer widths than Alternative 1. Low impact uses on category IV wetlands would have no change in buffer requirements from existing regulations. Buffer widths for low MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 159 impact uses on Category I wetlands would decrease as compared to current regulations. o Weaknesses: Nearly all buffer widths will increase and there is still no consideration of the actual function the wetlands provide during the assessment. • Buffer Alternative 3 sets the width based on wetland category, intensity of impacts, and wetland functions or special characteristics. This alternative also has two options for determining the widths of buffers when they are based on the score for habitat and provides three buffer widths based on habitat scores. o Strengths: Provides the greatest amount of flexibility. It looks at both the intensity of projects and uses and considers the function the wetland is providing. Low impact uses for Category IV wetlands would have the same buffer width requirement as existing regulations, and some Category III wetlands may see a reduction in buffer requirements for all proposed uses if the habitat score is low. With Category III and IV wetlands being the most common in the Port Angeles Urban Growth Area, this alternative results in lower buffer widths than what are currently required in similar situations. Category II wetlands may also see a buffer reduction, as there are multiple buffer widths offered depending on the levels of function for habitat. Wetland Category Existing Buffer Requirements Buffer Alternative 1 Buffer Alternative 2 Category I Buffers Low Intensity - 200 ft Low Impact - 150 ft Moderate Impact - 225 ft Low Intensity - 100 ft Low Impact - 150 ft Moderate Impact - 225 ft Low Intensity - 50 ft Low Impact - 75 ft Moderate Impact - 110 ft Low Intensity - 25 ft Low Impact - 25 ft Moderate Impact - 40 ft Table 1:Comparison of existing, Alternative 1 and Alternative2 buffer requirements for Category I, II, III and IV Wetlands from the 2018 Guidance on Widths of Buffers and Ratios for Compensatory Mitigation. MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 160 o Weaknesses: Requires greater scrutiny and analysis by qualified professionals during reporting and the ability of staff to determine whether the analysis was performed correctly. Additional site visits may need to be performed by staff, especially in situations where Category I and II wetlands are involved. • Buffer Alternative 3A provides a graduated scale of widths for buffers based on habitat scores. o Strengths: Whereas Buffer Alternative 3 works on a step-wise scale, using only three groupings of habitat scores (3-4, 5-7, and 8-9), Buffer Alternative 3A uses a graduated scale to reduce any potential contention that may result in up to a 50-foot buffer increase between scores, such as between a score of 4 and 5. o Weaknesses: There is no set scale for this option. It would be up to the City to determine how the gradient would be set, provided that the scale stays within the limits established from the scientific information that is currently available. Alternative 3 buffers widths are attached to this memo in Attachment A, for review. Careful consideration of all three alternatives will provide a wetland buffer evaluation system that works best for Port Angeles. Regardless of which alternative we choose, buffer widths will change from existing requirements based on the best available science as required by the State. RECOMMENDATION Staff are recommending the adoption of Buffer Alternative 3 as the preferred method for setting buffer requirements based on the best available science provided by the Washington Department of Ecology. This buffering option is also the preferred method by various other jurisdictions in Western Washington that share a similar historic reliance on natural resource economics and water transport due to their coastal or deep-water bay location, including City Of Bellingham, City of Anacortes, City of Aberdeen, City of Port Townsend, City of Tumwater, among others. Utilizing Buffer Alternative 3 would set the City of Port Angeles buffer requirements similar to above communities that share similar natural resource and critical area land use distributions as Port Angeles. Alternative 3 provides the greatest flexibility for evaluating buffer widths. It not only takes into consideration the impact the proposed land use would have on the wetland, but also MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 161 the level of function the wetland provides, which could result in a lower buffer requirement for some Category III wetlands, if they do not provide high quality habitat. References: WA Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates (https://apps.ecology.wa.gov/publications/documents/2206014.pdf) WA Department of Ecology Washington State Wetland Rating System for Western Washington (https://apps.ecology.wa.gov/publications/documents/1406029.pdf) WA Department of Ecology Wetlands in Washington State Vol. 2: Guidance for Protecting and Managing Wetlands, July 2018 Modified Habitat Score Ranges (https://apps.ecology.wa.gov/publications/parts/0506008part3.pdf) WA Department of Ecology Characterizing Wetland Buffers in Washington State (https://apps.ecology.wa.gov/publications/documents/1706008.pdf) MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 162 8C.2.3 Buffer Alternative 3: Width Based on Wetland Category, Intensity of Impacts, Wetland Functions, or Special Characteristics The third alternative provides the most flexibility by basing the widths of buffers on three factors: the wetland category, the intensity of the impacts (as used in Alternative 2), and the functions or special characteristics of the wetland that need to be protected as determined through the rating system. The recommended widths for buffers are shown in Tables 8C-4 to 8C-7. Using this alternative, a wetland may fall into more than one category in the table. For example, an interdunal wetland may be rated a Category III wetland because it is an isolated interdunal wetland, but it may be rated a Category II wetland based on its score for functions. Table 8C-4. Width of buffers needed to protect Category IV wetlands in western Washington (Buffer Alternative 3 for wetlands scoring less than 16 points for all functions). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use Other Measures Recommended for Protection Score for all 3 basic functions is less than 16 points Low - 25 ft Moderate – 40 ft High – 50 ft No recommendations at this time 1 No information on other measures for protection was available at the time this document was written. The Washington State Department of Ecology will continue to collect new information for future updates to this document. If a wetland meets more than one of the characteristics listed in Tables 8C-4 to 8C-7, the buffer recommended to protect the wetland is the widest one. For example, if a Category I wetland (Table 8C-7) scores 8 points for habitat and 7 points for water quality functions, a 300-foot buffer is needed for land uses with high impacts because the widths needed to protect habitat are wider than those needed for the other functions. MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 163 Table 8C-5. Width of buffers needed to protect Category III wetlands in western Washington (Buffer Alternative 3 for wetlands scoring 16 - 19 points for all functions). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use Other Measures Recommended for Protection Moderate level of function for habitat (score for habitat 6 - 7 points)* *If wetland scores 8-9 habitat points, use Table 8C-6 for Category II buffers Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time Score for habitat 3-5 points Low - 40 ft Moderate – 60 ft High – 80 ft No recommendations at this time 1 MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 164 Table 8C-6. Width of buffers needed to protect Category II wetlands in western Washington (Buffer Alternative 3 for wetlands scoring 20 - 22 points for all functions or having the “Special Characteristics” identified in the rating system). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use (Apply most protective if more than one criterion is met.) Other Measures Recommended for Protection High level of function for habitat (score for habitat 8 - 9 points) Low - 150 ft Moderate – 225 ft High – 300 ft Maintain connections to other habitat areas Moderate level of function for habitat (score for habitat 6 - 7 points) Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time2 High level of function for water quality improvement and low for habitat (score for water quality 8 - 9 points; habitat less than 6 points) Low - 50 ft Moderate – 75 ft High – 100 ft No additional surface discharges of untreated runoff Estuarine Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time2 Interdunal Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time2 Not meeting above characteristics Low - 50 ft Moderate – 75 ft High – 100 ft No recommendations at this time2 2 See footnote on the previous page. MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 165 Table 8C-7. Width of buffers needed to protect Category I wetlands in western Washington (Buffer Alternative 3 for wetlands scoring 23 points or more for all functions or having the “Special Characteristics” identified in the rating system). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use (Apply most protective if more than one criterion is met) Other Measures Recommended for Protection Wetlands Of High Conservation Value Low - 125 ft Moderate – 190 ft High – 250 ft No additional surface discharges to wetland or its tributaries No septic systems within 300 ft of wetland Restore degraded parts of buffer Bogs Low - 125 ft Moderate – 190 ft High – 250 ft No additional surface discharges to wetland or its tributaries Restore degraded parts of buffer Forested Buffer width to be based on score for habitat functions or water quality functions If forested wetland scores high for habitat, need to maintain connections to other habitat areas Restore degraded parts of buffer Estuarine Low - 100 ft Moderate – 150 ft High – 200 ft No recommendations at this time Wetlands in Coastal Lagoons Low - 100 ft Moderate – 150 ft High – 200 ft No recommendations at this time3 High level of function for habitat (score for habitat 8 - 9 points) Low – 150 ft Moderate – 225 ft High – 300 ft areas Restore degraded parts of buffer Interdunal wetland with high level of function for habitat (score for habitat 8 - 9 points). Low – 150 ft Moderate – 225 ft High – 300 ft areas Restore degraded parts of buffer Moderate level of function for habitat (score for habitat 6 - 7 points) Low – 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time3 High level of function for water quality improvement (8 – 9 points) and low for habitat (less than 6 points) Low – 50 ft Moderate – 75 ft High – 100 ft No additional surface discharges of untreated runoff Not meeting any of the above characteristics Low – 50 ft Moderate – 75 ft High – 100 ft No recommendations at this time3 3 See footnote on page 6. MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 166 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 13 Rating Form – Effective January 1, 2015 These questions apply to wetlands of all HGM classes. HABITAT FUNCTIONS - Indicators that site functions to provide important habitat H 1.0. Does the site have the potential to provide habitat? H 1.1. Structure of plant community: Indicators are Cowardin classes and strata within the Forested class. Check the Cowardin plant classes in the wetland. Up to 10 patches may be combined for each class to meet the threshold of ¼ ac or more than 10% of the unit if it is smaller than 2.5 ac. Add the number of structures checked. ____Aquatic bed 4 structures or more: points = 4 ____Emergent 3 structures: points = 2 ____Scrub-shrub (areas where shrubs have > 30% cover) 2 structures: points = 1 ____Forested (areas where trees have > 30% cover) 1 structure: points = 0 If the unit has a Forested class, check if: ____The Forested class has 3 out of 5 strata (canopy, sub-canopy, shrubs, herbaceous, moss/ground-cover) that each cover 20% within the Forested polygon H 1.2. Hydroperiods Check the types of water regimes (hydroperiods) present within the wetland. The water regime has to cover more than 10% of the wetland or ¼ ac to count (see text for descriptions of hydroperiods). ____Permanently flooded or inundated 4 or more types present: points = 3 ____Seasonally flooded or inundated 3 types present: points = 2 ____Occasionally flooded or inundated 2 types present: points = 1 ____Saturated only 1 type present: points = 0 ____Permanently flowing stream or river in, or adjacent to, the wetland ____Seasonally flowing stream in, or adjacent to, the wetland ____Lake Fringe wetland 2 points ____Freshwater tidal wetland 2 points H 1.3. Richness of plant species Count the number of plant species in the wetland that cover at least 10 ft 2. Different patches of the same species can be combined to meet the size threshold and you do not have to name the species. Do not include Eurasian milfoil, reed canarygrass, purple loosestrife, Canadian thistle If you counted: > 19 species points = 2 5 - 19 species points = 1 < 5 species points = 0 H 1.4. Interspersion of habitats Decide from the diagrams below whether interspersion among Cowardin plants classes (described in H 1.1), or the classes and unvegetated areas (can include open water or mudflats) is high, moderate, low, or none. If you have four or more plant classes or three classes and open water, the rating is always high. None = 0 points Low = 1 point Moderate = 2 points All three diagrams in this row are HIGH = 3points MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 167 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 14 Rating Form – Effective January 1, 2015 H 1.5. Special habitat features: Check the habitat features that are present in the wetland. The number of checks is the number of points. ____Large, downed, woody debris within the wetland (> 4 in diameter and 6 ft long). ____Standing snags (dbh > 4 in) within the wetland ____Undercut banks are present for at least 6.6 ft (2 m) and/or overhanging plants extends at least 3.3 ft (1 m) over a stream (or ditch) in, or contiguous with the wetland, for at least 33 ft (10 m) ____Stable steep banks of fine material that might be used by beaver or muskrat for denning (> 30 degree slope) OR signs of recent beaver activity are present (cut shrubs or trees that have not yet weathered where wood is exposed) ____At least ¼ ac of thin-stemmed persistent plants or woody branches are present in areas that are permanently or seasonally inundated (structures for egg-laying by amphibians) ____Invasive plants cover less than 25% of the wetland area in every stratum of plants (see H 1.1 for list of strata) Total for H 1 Add the points in the boxes above Rating of Site Potential If score is: 15-18 = H 7-14 = M 0-6 = L Record the rating on the first page H 2.0. Does the landscape have the potential to support the habitat functions of the site? H 2.1. Accessible habitat (include only habitat that directly abuts wetland unit). Calculate: % undisturbed habitat + [(% moderate and low intensity land uses)/2] = _______% If total accessible habitat is: > 1/3 (33.3%) of 1 km Polygon points = 3 20-33% of 1 km Polygon points = 2 10-19% of 1 km Polygon points = 1 < 10% of 1 km Polygon points = 0 H 2.2. Undisturbed habitat in 1 km Polygon around the wetland. Calculate: % undisturbed habitat + [(% moderate and low intensity land uses)/2] = _______% Undisturbed habitat > 50% of Polygon points = 3 Undisturbed habitat 10-50% and in 1-3 patches points = 2 Undisturbed habitat 10-50% and > 3 patches points = 1 Undisturbed habitat < 10% of 1 km Polygon points = 0 H 2.3. Land use intensity in 1 km Polygon: If > 50% of 1 km Polygon is high intensity land use points = (- 2) ≤ 50% of 1 km Polygon is high intensity points = 0 Total for H 2 Add the points in the boxes above Rating of Landscape Potential If score is: 4-6 = H 1-3 = M < 1 = L Record the rating on the first page H 3.0. Is the habitat provided by the site valuable to society? H 3.1. Does the site provide habitat for species valued in laws, regulations, or policies? Choose only the highest score that applies to the wetland being rated. Site meets ANY of the following criteria: points = 2  It has 3 or more priority habitats within 100 m (see next page)  It provides habitat for Threatened or Endangered species (any plant or animal on the state or federal lists)  It is mapped as a location for an individual WDFW priority species  It is a Wetland of High Conservation Value as determined by the Department of Natural Resources  It has been categorized as an important habitat site in a local or regional comprehensive plan, in a Shoreline Master Plan, or in a watershed plan Site has 1 or 2 priority habitats (listed on next page) within 100 m points = 1 Site does not meet any of the criteria above points = 0 Rating of Value If score is: 2 = H 1 = M 0 = L Record the rating on the first page MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 168 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 15 Rating Form – Effective January 1, 2015 WDFW Priority Habitats Priority habitats listed by WDFW (see complete descriptions of WDFW priority habitats, and the counties in which they can be found, in: Washington Department of Fish and Wildlife. 2008. Priority Habitat and Species List. Olympia, Washington. 177 pp. http://wdfw.wa.gov/publications/00165/wdfw00165.pdf or access the list from here: http://wdfw.wa.gov/conservation/phs/list/) Count how many of the following priority habitats are within 330 ft (100 m) of the wetland unit: NOTE: This question is independent of the land use between the wetland unit and the priority habitat.  Aspen Stands: Pure or mixed stands of aspen greater than 1 ac (0.4 ha).  Biodiversity Areas and Corridors: Areas of habitat that are relatively important to various species of native fish and wildlife (full descriptions in WDFW PHS report).  Herbaceous Balds: Variable size patches of grass and forbs on shallow soils over bedrock.  Old-growth/Mature forests: Old-growth west of Cascade crest – Stands of at least 2 tree species, forming a multi- layered canopy with occasional small openings; with at least 8 trees/ac (20 trees/ha ) > 32 in (81 cm) dbh or > 200 years of age. Mature forests – Stands with average diameters exceeding 21 in (53 cm) dbh; crown cover may be less than 100%; decay, decadence, numbers of snags, and quantity of large downed material is generally less than that found in old-growth; 80-200 years old west of the Cascade crest.  Oregon White Oak: Woodland stands of pure oak or oak/conifer associations where canopy coverage of the oak component is important (full descriptions in WDFW PHS report p. 158 – see web link above).  Riparian: The area adjacent to aquatic systems with flowing water that contains elements of both aquatic and terrestrial ecosystems which mutually influence each other.  Westside Prairies: Herbaceous, non-forested plant communities that can either take the form of a dry prairie or a wet prairie (full descriptions in WDFW PHS report p. 161 – see web link above).  Instream: The combination of physical, biological, and chemical processes and conditions that interact to provide functional life history requirements for instream fish and wildlife resources.  Nearshore: Relatively undisturbed nearshore habitats. These include Coastal Nearshore, Open Coast Nearshore, and Puget Sound Nearshore. (full descriptions of habitats and the definition of relatively undisturbed are in WDFW report – see web link on previous page).  Caves: A naturally occurring cavity, recess, void, or system of interconnected passages under the earth in soils, rock, ice, or other geological formations and is large enough to contain a human.  Cliffs: Greater than 25 ft (7.6 m) high and occurring below 5000 ft elevation.  Talus: Homogenous areas of rock rubble ranging in average size 0.5 - 6.5 ft (0.15 - 2.0 m), composed of basalt, andesite, and/or sedimentary rock, including riprap slides and mine tailings. May be associated with cliffs.  Snags and Logs: Trees are considered snags if they are dead or dying and exhibit sufficient decay characteristics to enable cavity excavation/use by wildlife. Priority snags have a diameter at breast height of > 20 in (51 cm) in western Washington and are > 6.5 ft (2 m) in height. Priority logs are > 12 in (30 cm) in diameter at the largest end, and > 20 ft (6 m) long. Note: All vegetated wetlands are by definition a priority habitat but are not included in this list because they are addressed elsewhere. MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 169 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 16 Rating Form – Effective January 1, 2015 CATEGORIZATION BASED ON SPECIAL CHARACTERISTICS Wetland Type Check off any criteria that apply to the wetland. Circle the category when the appropriate criteria are met. Category SC 1.0. Estuarine wetlands Does the wetland meet the following criteria for Estuarine wetlands?  The dominant water regime is tidal,  Vegetated, and  With a salinity greater than 0.5 ppt Yes –Go to SC 1.1 No= Not an estuarine wetland SC 1.1. Is the wetland within a National Wildlife Refuge, National Park, National Estuary Reserve, Natural Area Preserve, State Park or Educational, Environmental, or Scientific Reserve designated under WAC 332 -30-151? Yes = Category I No - Go to SC 1.2 Cat. I SC 1.2. Is the wetland unit at least 1 ac in size and meets at least two of the following three conditions?  The wetland is relatively undisturbed (has no diking, ditching, filling, cultivation, grazing, and has less than 10% cover of non-native plant species. (If non-native species are Spartina, see page 25)  At least ¾ of the landward edge of the wetland has a 100 ft buffer of shrub, forest, or un-grazed or un- mowed grassland.  The wetland has at least two of the following features: tidal channels, depressions with open water, or contiguous freshwater wetlands. Yes = Category I No = Category II Cat. I Cat. II SC 2.0. Wetlands of High Conservation Value (WHCV) SC 2.1. Has the WA Department of Natural Resources updated their website to include the list of Wetlands of High Conservation Value? Yes – Go to SC 2.2 No – Go to SC 2.3 SC 2.2. Is the wetland listed on the WDNR database as a Wetland of High Conservation Value? Yes = Category I No = Not a WHCV SC 2.3. Is the wetland in a Section/Township/Range that contains a Natural Heritage wetland? http://www1.dnr.wa.gov/nhp/refdesk/datasearch/wnhpwetlands.pdf Yes – Contact WNHP/WDNR and go to SC 2.4 No = Not a WHCV SC 2.4. Has WDNR identified the wetland within the S/T/R as a Wetland of High Conservation Value and listed it on their website? Yes = Category I No = Not a WHCV Cat. I SC 3.0. Bogs Does the wetland (or any part of the unit) meet both the criteria for soils and vegetation in bogs? Use the key below. If you answer YES you will still need to rate the wetland based on its functions. SC 3.1. Does an area within the wetland unit have organic soil horizons, either peats or mucks, that compose 16 in or more of the first 32 in of the soil profile? Yes – Go to SC 3.3 No – Go to SC 3.2 SC 3.2. Does an area within the wetland unit have organic soils, either peats or mucks, that are less than 16 in deep over bedrock, or an impermeable hardpan such as clay or volcanic ash, or that are floating on top of a lake or pond? Yes – Go to SC 3.3 No = Is not a bog SC 3.3. Does an area with peats or mucks have more than 70% cover of mosses at ground level, AND at least a 30% cover of plant species listed in Table 4? Yes = Is a Category I bog No – Go to SC 3.4 NOTE: If you are uncertain about the extent of mosses in the understory , you may substitute that criterion by measuring the pH of the water that seeps into a hole dug at least 16 in deep. If the pH is less than 5.0 and the plant species in Table 4 are present, the wetland is a bog. SC 3.4. Is an area with peats or mucks forested (> 30% cover) with Sitka spruce, subalpine fir, western red cedar, western hemlock, lodgepole pine, quaking aspen, Engelmann spruce, or western white pine, AND any of the species (or combination of species) listed in Table 4 provide more than 30% of the cover under the canopy? Yes = Is a Category I bog No = Is not a bog Cat. I MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 170 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 17 Rating Form – Effective January 1, 2015 SC 4.0. Forested Wetlands Does the wetland have at least 1 contiguous acre of forest that meets one of these criteria for the WA Department of Fish and Wildlife’s forests as priority habitats? If you answer YES you will still need to rate the wetland based on its functions.  Old-growth forests (west of Cascade crest): Stands of at least two tree species, forming a multi-layered canopy with occasional small openings; with at least 8 trees/ac (20 trees/ha) that are at least 200 years of age OR have a diameter at breast height (dbh) of 32 in (81 cm) or more.  Mature forests (west of the Cascade Crest): Stands where the largest trees are 80- 200 years old OR the species that make up the canopy have an average diameter (dbh) exceeding 21 in (53 cm). Yes = Category I No = Not a forested wetland for this section Cat. I SC 5.0. Wetlands in Coastal Lagoons Does the wetland meet all of the following criteria of a wetland in a coastal lagoon?  The wetland lies in a depression adjacent to marine waters that is wholly or partially separated from marine waters by sandbanks, gravel banks, shingle, or, less frequently, rocks  The lagoon in which the wetland is located contains ponded water that is saline or brackish (> 0.5 ppt) during most of the year in at least a portion of the lagoon (needs to be measured near the bottom) Yes – Go to SC 5.1 No = Not a wetland in a coastal lagoon SC 5.1. Does the wetland meet all of the following three conditions?  The wetland is relatively undisturbed (has no diking, ditching, filling, cultivation, grazing), and has less than 20% cover of aggressive, opportunistic plant species (see list of species on p. 100).  At least ¾ of the landward edge of the wetland has a 100 ft buffer of shrub, forest, or un -grazed or un- mowed grassland.  The wetland is larger than 1/10 ac (4350 ft2) Yes = Category I No = Category II Cat. I Cat. II SC 6.0. Interdunal Wetlands Is the wetland west of the 1889 line (also called the Western Boundary of Upland Ownership or WBUO)? If you answer yes you will still need to rate the wetland based on its habitat functions. In practical terms that means the following geographic areas:  Long Beach Peninsula: Lands west of SR 103  Grayland-Westport: Lands west of SR 105  Ocean Shores-Copalis: Lands west of SR 115 and SR 109 Yes – Go to SC 6.1 No = not an interdunal wetland for rating SC 6.1. Is the wetland 1 ac or larger and scores an 8 or 9 for the habitat functions on the form (rates H,H,H or H,H,M for the three aspects of function)? Yes = Category I No – Go to SC 6.2 SC 6.2. Is the wetland 1 ac or larger, or is it in a mosaic of wetlands that is 1 ac or larger? Yes = Category II No – Go to SC 6.3 SC 6.3. Is the unit between 0.1 and 1 ac, or is it in a mosaic of wetlands that is between 0.1 and 1 ac? Yes = Category III No = Category IV Cat I Cat. II Cat. III Cat. IV Category of wetland based on Special Characteristics If you answered No for all types, enter “Not Applicable” on Summary Form MCA 26-0090 Exhibit 8 September 23, 2026 Planning Commission Regular Meeting 171 MCA 26-0090 Exhibit 9 PLANNING COMMISSION MEETING Port Angeles, Washington August 26, 2026 This meeting was conducted as a hybrid meeting. CALL TO ORDER - REGULAR MEETING Chair Young called the regular meeting of the Port Angeles Planning Commission to order at 6:05 p.m. ROLL CALL Planning Commission Chair Steiger, Vice Chair Kiedrowski, Commissioners: Omega, Vogel. Members Absent: Commissioner Schorr, Mellema, Vanderlugt. Staff Present: Planning Supervisor Ben Braudrick, Natural Resources and Grant Administrator Coutney Bornsworth, Senior Development Services Specialist Pat Bartholick. COMMISSIONER INTRODUCTIONS Planning Commissioners introduced themselves to newly appointed Commissioner Omega. PUBLIC COMMENT John R., Resident Supports Façade Grant 26-0002. ADA improvements made for all future grants. AGENDA ITEMS Action Item: Action: Façade Grant 26-0002 Studio Bob. Planning Commission review of façade grant proposal for façade updates (paint and highlight historic art deco architectural features restoration) at Studio Bob and Sound Bikes and Kayaks, 118 E Front St, Port Angeles, WA 98362. It was moved by Kiedrowski and seconded by Vogel to: Approve funding for Façade Improvement Grant 26-0002, citing 7 findings, 2 conclusions, and 8 conditions in the staff report. Motion carried 4-0. Action Item: MCA 26-0090 Wetlands Buffer Options Analysis. Staff presentation on wetland buffering regulations. Planning Commission action to recommend the preferred alternative for the wetland buffers. It was moved by Omega and seconded by Vogel to: Select Option 3 as the preferred Wetland Buffer methodology It was moved by Steiger and seconded by Vogel to Amend the motion to also include exceptions listed from WAC 365-195-915 Motion carried 3-1, with Kiedrowski dissenting. Amended Motion: Select Option 3 as the preferred Wetland Buffer methodology and include exceptions listed from WAC 365-195-915. Motion carried 3-1, with Kiedrowski dissenting. Discussion: MCA 26-0090 Critical Areas Ordinance Update. Staff presentation and Planning Commission discussion of Phase 2 of the development code updates to Titles 11, 13, and 15 of the municipal code with the proposed amended code. September 23, 2026 Planning Commission Regular Meeting 172 CITY OF PORT ANGELES PLANNING COMMISSION – August 26, 2026 Page 2 of 3 Changes for Title 15 suggested by the Planning Commission: Section 15.02.010: Add definition to scientific expert and remove the definition for qualified professional. Section 15.22.230.B.: Missing Sections 3 and 7. Section 15.22.230.B.4: strike the words “do not” and add the word “minimize”. Section 15.22.280: Request to review aquifer recharge map prior to finalization. Section 15.22.290.A.1: change “and” to “or”. Section 15.22.310: Concern over level of analysis for expansion of existing use. Section 15.22.360: Missing point “d”. Section 15.22.410.D: Clarification tree replacement as an enforcement issue. Section 15.22.450.A.8: How will staff define locally important habitat areas? Section 15.22.480.E: Change “EMZ” to “RMZ”. STAFF UPDATES Customer Service Report None given. Monthly Type 0/Over the Counter Report None given. Monthly 5290 Report Licensing Administrator and Building Inspector Jackson gave a brief report on the 5290 permitting timelines for July 2026. Monthly Affordable Housing Report None given. Monthly Natural Resources Report The City is reviewing two SEPA checklist applications for the Port Angeles School District. Monthly Land Use Permitting and Economic Development Report None given. Monthly Building Report Senior Development Services Specialist Bartholick gave the July 2026 building report, which showed 56 building permits were issued. Quarterly Business Licensing Report None given COMMISSION REPORTS No reports given due to time constraints. September 23, 2026 Planning Commission Regular Meeting 173 CITY OF PORT ANGELES PLANNING COMMISSION – August 26, 2026 Page 3 of 3 COMMISSION REPORTS None given. SECOND PUBLIC COMMENT John R., Resident Did the City get any feedback on the proposed CAO update from qualified professions. Concerned about the accuracy of the various critical area maps from federal, state, and local agencies. Provided an editorial from the Seattle Times about construction costs. ADJOURNMENT Chair Stieger adjourned the meeting at 7:45 p.m. _____________________________________ _______________________________ Chair Steiger, Chair Ben Braudrick, Secretary September 23, 2026 Planning Commission Regular Meeting 174 Developm ent C ode Am endm ent Projec t Pha s e 2 : C ritic a l Area s Ord. & Urba n Fores try Sta keholder C om m ittee Meeting 1 Kic k off Agenda J une 2 , 2026 , 3:00 – 4:00 PM Location: Vern Burton Meeting Rooms 321 E 5 th St., Port Angeles, WA 98362 Objectives •Stakeholder Orientation to Phase 2 of the Critical Area Ordinance and Urban Forestry Amendment Project. •Overview of Project Scope and Steps. •Discuss Roles and Responsibilities of Stakeholders during the scope of the project. •Discussion of future meeting participation, reoccurrence, and location. Meeting Schedule Kickoff and Introduction to the Critical Areas Ordinance, Scope Overview and Goals and Objectives of the updates. • Discuss CAO Checklist from Department of Commerce •All participants 3:50 PM Discussion of future meeting participation, reoccurrence, and location •All participants 4:00 P M Adjourn S tak eholders Invited: Melissa Voltz, Lower Elwha Klallam Tribe Ian Miller, Washington Sea Grant Melissa Williams, Feiro Marine Life Center (Olympic Coast Exploration Center) J esse Waknitz, Port or Port Angeles Angela Glore, Strait Ecosystem Recovery Network Sam Grello, Port Angeles Waterfront District Colleen McAleer, Clallam EDC Mitch Koonz, Clallam EDC Amber Dewey, North Peninsula Building Association Susannah Spock, FutureWise MCA 26-0090 Exhibit 10 September 23, 2026 Planning Commission Regular Meeting 175 Development Code Amendment Project Phase 2: Critical Areas Ord. & Urban Forestry Stakeholder Committee Meeting 2 Agenda June 30, 2026, 3:00 – 4:00 PM Location: Vern Burton Meeting Rooms 321 E 5th St., Port Angeles, WA 98362 Objectives • Overview and discussion of the Wetland and Critical Habitat code audit Meeting Schedule 3:00 PM Presentation and discussion of the critical area code audit • Discussion of future meeting dates and agendas • All participants 4:00 PM Adjourn Stakeholders Invited: Melissa Voltz, Lower Elwha Klallam Tribe Ian Miller, Washington Sea Grant Melissa Williams, Feiro Marine Life Center (Olympic Coast Exploration Center) Jesse Waknitz, Port or Port Angeles Chris Hartman, Port or Port Angeles Angela Glore, Strait Ecosystem Recovery Network Sam Grello, Port Angeles Waterfront District Sarah Doyle, North Olympic Salmon Coalition Colleen McAleer, Clallam EDC/Port of Port Angeles Mitch Koonz, Clallam EDC Jim Haguewood, Port Angeles Association of Realtors/Waterfront District Amber Dewey, North Peninsula Building Association Susannah Spock, FutureWise Cheryl Baumann, NOPLE MCA 26-0090 Exhibit 10 September 23, 2026 Planning Commission Regular Meeting 176 Development Code Amendment Project Phase 2: Critical Areas Ord. & Urban Forestry Internal Stakeholder Committee Meeting 3 Agenda August 4, 2026, 3:00 PM– 4:30 PM Location: Vern Burton Meeting Rooms and Online 321 E 5th St., Port Angeles, WA 98362 Objectives • Discuss Title 15 Code Amendments To-Date • Discuss next steps and possible meeting #4 in September Meeting Schedule 3:00 PM • Courtney Bornsworth • Discussion of Article I – General Provisions Special attention and time will be given to the exemptions, allowed uses, and permitted uses sections. • Courtney Bornsworth • All 3:30 PM Discussion of Article II – Critical Areas Review Procedures Focus on report requirements and mitigation. • Courtney Bornsworth • All 4:00 PM Adjourn Stakeholders Invited: Melissa Voltz, Lower Elwha Klallam Tribe Ian Miller, Washington Sea Grant Melissa Williams, Feiro Marine Life Center (Olympic Coast Exploration Center) Chris Hartman, Port of Port Angeles Teagan Darmody, Strait Ecosystem Recovery Network Sam Grello, Port Angeles Waterfront District Colleen McAleer, Clallam EDC/Port of Port Angeles Mitch Koonz, Clallam EDC Jim Haguewood, Port Angeles Association of Realtors/Waterfront District Amber Dewey, North Peninsula Building Association Susannah Spock, FutureWise Cheryl Baumann, NOPLE MCA 26-0090 Exhibit 10 September 23, 2026 Planning Commission Regular Meeting 177 Critical Areas Checklist A Technical Assistance Tool f rom Growth Management Services – updated May 2024 INSTRUCTIONS This checklist is intended to help local governments update their development regulations, pursuant to the schedule in RCW 36.70A.130(5). We strongly encourage but do not require jurisdictions to complete the checklist and return it to Growth Management Services (GMS), along with their updates. However, If the jurisdiction is using a portion of their Periodic Update Grant (PUG) to update the Critical Areas Ordinance, this checklist is required. This checklist may be used by all jurisdictions, including those local governments planning for resource lands and critical areas only. For general information on update requirements, refer to A Guide to the Periodic Update Process Under the Growth Management Act – Fully Planning Counties & Cities, 2022 and WAC 365-196-610 . For additional information, resources , and general checklists pertaining to comprehensive plan and development regulation periodic updates please visit Commerce’s Growth Management Act Periodic Update webpage. Bold items are a GMA requirement or may be related requirements of other state or federal laws . Underlined items are links to Internet sites and may include best practices or other ideas to consider. Commerce WAC provisions are advisory under Commerce’s statutory mandate to provide technical assistance, RCW 43.330.120 which states that the Department of Commerce “…shall help local officials interpret and implement the different requirements of the act through workshops, model ordinances, and information materials .” If you have questions, call GMS at (360) 725-3066. 0BHow to fill out the checklist Using the current version of your critical areas re gulations, fill out each item in the checklist. Select the check box or type in text fields, answering the following question: Is this item addressed in your current Critical Areas Ordinance (CAO)? If YES, fill in the form with citation(s) to where in the plan or code the item is addressed. We recommend using citations rather than page numbers because they stay the same regardless of how the document is printed. If you have questions about the requirement, follow the hyperlinks to the relevant statutory provision or rules. If you still have questions, visit the Commerce Growth Management Services Web page or contact one of the Commerce planners assigned to your region. Instructions………..………….….1 Overall Requirements………..2 We tlands…………………………….3 Critical Aquifer Recharge Areas…………………………….……5 Frequently Flooded Areas….6 Geologically Hazardous Areas…………………………………. 7 Fish and Wildlife H abitat Conservation Areas….………..8 Designating and Protecting Waters of the State……..….....9 A nadromous Fisheries………………………….....10 Reasonable Use Exceptions…………………….…….10 Agricultural Activities…….…..11 Forest Practices Regulations……………………....11 Good Ideas…….……..……….….12 MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 178 CRITICAL AREAS Regulations protecting critical areas are required by RCW 36.70A.060(2) and RCW 36.70A.172(1). WAC 365-195-900 through 925 provide guidelines . Guidance can also be found in Commerce’s Critical Areas Handbook (2022); the Minimum Guidelines WAC 365-190-080 through 130; Best Available Science WAC 365-195; and Procedural Criteria , WAC 365-196-485 and WAC 365-196-830, and on Growth Management’s Critical Areas webpage. Regulations required to protect critical areas current plan or regulations? If yes, OVERALL REQUIREMENTS The CAO includes best available science to clearly designate and protect all critical areas that might be found within the jurisdiction. 1. Designation of Critical Areas RCW 36.70A.170(1)(d) requires all counties and cities to designate critical areas. RCW 36.70A.170(2) requires that counties and cities consider the Commerce Minimum Guidelines pursuant to RCW 36.70A.050. RCW 36.70A.050 directs Commerce to adopt the Minimum Guidelines to classify critical areas. WAC 365 -190-080 through 130 provide guidance on defining or “designating” each of the five critical areas. WAC 365-190-040 outlines the process to classify and designate natural resource lands and critical areas. 2. Definition of Critical Areas RCW 36.70A.030(11 ) provides definitions for critical areas . Sections (20 ) regarding geologically hazardous areas; and (48 ) regarding wetlands were updated in 2010. WAC 365-190-030 provides definitions in the Minimum Guidelines. 3. Protection of Critical Areas RCW 36.70A.060(2) requires counties and cities to adopt development regulations that protect the critical areas required to be designated under RCW 36.70A.170. RCW 36.70A.172(1) requires the inclusion of best available science in developing policies and development regulations to protect the functions and values of critical areas. In addition, counties and cities must give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries. WAC 365-196-830 provides guidance on protection of critical areas. in the record for the review and updates to the critical areas regulations? ☒ Yes ☐ No Location in Text: 15.22.010 - Purpose 15.22 .0 20 - Applicability Do your regulations address no net loss and require compensatory mitigation? ☒ Yes ☐ No Location in Text: 15.22.040 – Protection of critical areas and best available science. 15.22.050 – Project evaluation. 15.22.130 – Mitigation sequencing. 15.22.140 – Mitigation plan requirements. MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 179 4. Inclusion of Best Available Science RCW 36.70A.172(1) requires inclusion of the best available science (BAS). WAC 365-195-900 through 925 outlines recommended criteria for determining which information is the BAS, for obtaining the BAS, for including BAS in policies and regulations, for addressing inadequate scientific information, and for demonstrating “special consideration” to conservation or protection measures necessary to preserve or enhance anadromous fisheries. WAC 365-195-915 provides criteria for including BAS in the record. 5. No net loss of critical area functions and values is a requirement for development regulations in WAC 365 -196-830(4). If development regulations allow harm to critical areas, they must require compensatory mitigation of the harm. WETLANDS DEFINITION The definition of wetlands is consistent with RCW 36.70A.030(48). Is the wetland definition consistent with RCW 36.70A.030(48)? ☒ Yes ☐ No ☐ N/A Location in Text: 15.02.010 - Definitions MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 180 WETLANDS DELINEATION Wetlands are delineated using the approved federal wetland delineation manual and applicable regional supplements in accordance with WAC 173-22-035. See Ecology’s Wetland Delineation page and WAC 365-190-090 for additional assistance. Are wetlands delineated using the approved Federal Wetland Delineation Manual and Regional Supplements? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.220.B WETLANDS PROTECTION Policies and regulations protect the functions and values of wetlands. RCW 36.70A.172(1). Counties and cities are encouraged to make their actions consistent with the intent and goals of “protection of wetlands”, Executive Order 89 -10 as it existed on September 1, 1990. WAC 365-190-090(3) recommends using a wetlands rating system that evaluates the existing wetland functions and values to determine what functions must be protected. Ecology updated its recommended wetlands rating systems effective J anuary 2015. For information on the rating system, including the J uly 2018 adjustments to ranges for habitat scores, see: • 2014 Updates to the Washington State Wetland Rating Systems • Washington State Wetland Rating System for Western Washington • Washington State Wetland Rating System for Eastern Washington For other resources and guidance on protecting wetlands, go to Ecology’s Local Wetland Regulations: Growth Management Act technical assistance and see: • Wetland Guidance for Critical Areas Ordinance (CAO) Updates: Western and Eastern Washington (2022) Do the regulations use a rating system to determine wetlands protection? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.220.C MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 181 CRITICAL AQUIFER RECHARGE AREAS Policies and regulations protect the functions and values of critical aquifer recharge areas. RCW 36.70A.172(1). Policies and regulations protect the quality and quantity of groundwater used for public water supplies. RCW 36.70A.070(1) and WAC 365-196-485(1)(d). The following references also relate to protection of groundwater resources: • RCW 90.44 – Regulation of Public Groundwaters • RCW 90.48 – Water Pollution Control • RCW 90.54 – Water Resources Act of 1971 • RCW 36.36.020 - Creation of aquifer protection area (198 5) • WAC 365-190-100 Critical Aquifer Recharge Areas 2023 • WAC 173-100 Groundwater Management Areas and Programs (1988) • WAC 173-200 Water Quality Standards for Groundwaters of the State of Washington (1990) • WAC 365-196-735 Consideration of state and regional planning provisions (list) (2010) The Critical Aquifer Recharge Areas Guidance Document (2021) provides information on protecting functions and values of critical aquifer recharge areas, best available science, how to work with state and local regulations and adaptive management. Also, consider the following: • Prohibiting or strictly regulating hazardous uses in critical aquifer recharge areas (CARAs) and designating and protecting wellhead areas. See Ecology’s guidance on Critical Aquifer Recharge Areas . • Limiting impervious surfaces to reduce stormwater runoff, as required under Phase I and II municipal stormwater permits. Ecology’s Stormwater Manual for Western Washington (2012) includes low impact development (LID) related definitions, requirements, and an LID performance standard. See Stormwater Management and Design Manuals on Ecology’s web page. • For additional guidance on LID resources, see Commerce’s Incentivizing low- impact development guidebook . If groundwater is used for potable water, do regulations protect the quality and quantity of ground water? ☐ Yes ☐ No ☒ N/A Location in text: COPA does not currently use groundwater for potable water, however, regulation is planned to be set should the City explore the use of groundwater for potable water. Article IV Sections 15.22.280 – 15.22.320 . Are the critical aquifer recharge regulations consistent with current mapping of these critical areas? ☐ Yes ☐ No ☒ N/A Location in text: Mapping will be updated over the coming months prior to ordinance adoption. MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 182 CRITICAL AQUIFER RECHARGE AREAS FREQUENTLY FLOODED AREAS Regulations protect the functions and values of frequently flooded areas and safeguard the public from hazards to health and safety. RCW 36.70A.172(1). WAC 365-196-830 provides: "’Protection‘ in this context means preservation of the functions and values of the natural environment, or to safeguard the public from hazards to health and safety.” WAC 365-190-110 directs c ounties and cities to consider the following when designating and classifying frequently flooded areas: (a) Effects of flooding on human health and safety, and to public facilities and services; (b) Available documentation including federal, state, and local laws, regulations, and programs, local studies and maps, and federal flood insurance programs, including the provisions for urban growth areas in RCW 36.70A.110; (c) The future flow flood plain, defined as the channel of the stream and that portion of the adjoining flood plain that is necessary to contain and discharge the base flood flow at build out; (d) The potential effects of tsunami, high tides with strong winds, sea level rise, and extreme weather events, including those potentially resulting from global climate change; (e) Greater surface runoff caused by increasing impervious surfaces. Classification of and regulations for frequently flooded areas should not conflict with the FEMA requirements for the National Flood Insurance Program (NFIP). See Ecology’s Frequently Flooded areas: Critical Areas Ordinance webpage and 44 CFR 60. Communities that are located on Puget Sound or the Strait of J uan de Fuca, or have lakes, rivers or streams that directly or indirectly drain to those water bodies, are subject to the NFIP Biological Opinion (BiOp) for Puget Sound. The biological opinion required changes to the implementation of the NFIP in order to meet the requirements of the Endangered Species Act (ESA) in the Puget Sound watershed. FEMA Region X has developed an implementation plan that allows communities to apply the performance standards contained in the Biological Opinion by implementing: Are f requently flooded areas designated and regulated using FEMA and Ecology guidance? ☒ Yes ☐ No ☐ N/A Location in Text: Chapter 15.12 was updated in 2024 (referenced in Article V, sections 15.22.33 0 - 15.22.370) Are you utilizing your CAO as part of a programmatic response to the BiOp? ☒ Yes ☐ No ☐ N/A Location in Text: A rticle V MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 183 FREQUENTLY FLOODED AREAS 1) a model ordinance ; 2) a programmatic Checklist; or 3) on a permit by permit basis as long as it can be demonstrated that there is no adverse effect to listed species. Communities have the option of utilizing their CAOs as part of a programmatic response to address the requirements of the biological opinion. FEMA must approve a community’s biological opinion compliance strategy. Additional resources: RCW 86.12 Flood Control by Counties RCW 86.16 Floodplain Management RCW 86.26 State Participation in Flood Control Maintenance RCW 86.16.041 Floodplain Management Ordinance and Amendments WAC 173-158-070 Requirements for construction in Special Flood Hazard Areas DEFINITION OF GEOLOGICALLY HAZARDOUS AREAS The definition of geologically hazardous areas is consistent with RCW 36.70A.030(20) and WAC 365-190-120(1). “Geologically hazardous areas" means areas that because of their susceptibility to erosion, sliding, earthquake, or other geological events, are not suited to the siting of commercial, residential, or industrial development consistent with public health or safety concerns. Is the geologically hazardous areas definition consistent with RCW 36.70A.030(20)? ☒ Yes ☐ No ☐ N/A Location in Text: 15.02.010 - Definitions PROTECTION OF GEOLOGICALLY HAZARDOUS AREAS Regulations protect the functions and values of geologically hazardous areas and safeguard the public from hazards to health and safety. RCW 36.70A.172(1). WAC 365-196-830 provides: “’Protection’" in this context means preservation of the functions and values of the natural environment, or to safeguard the public from hazards to health and safety.” Geologically hazardous areas are designated, and their use is regulated or limited consistent with public health and safety concerns . RCW 36.70A.030(20) WAC 365-190-120 describes the different types of hazardous areas: Are uses in geologically hazardous areas designated and regulated or limited consistent with public health and safety? ☒ Yes ☐ No ☐ N/A MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 184 • Geologically hazardous areas include: • Erosion hazards • Landslide hazards • seismic hazards • tsunami hazards • volcanic hazards • channel migration zones • areas subject to other geological events such as coal mine hazards including: mass wasting, debris flows, rock falls, and differential settlement. The Department of Natural Resource’s Washington Geological Survey Geologic Hazards and the Environment website includes information on earthquakes and faults, landslides, volcanoes and lahars, tsunamis, hazardous minerals, emergency preparedness, historic mines and includes geologic hazard maps that can be accessed from the Geologic Information Portal. Location in Text: Sections 15.22.380 – 1.22.430 Additionally, 15.22.070 – 15.22.100 defines exempt, allowed, permitted, and reasonable use exceptions for all critical areas. DEFINITION OF FISH AND WILDLIFE HABITAT AND CONSERVATION AREAS The definition of fish and wildlife habitat conservation areas is consistent with WAC 365-190-030(6). The definition of fish and wildlife habitat conservation areas was amended to state that they do not include: “such artificial features or constructs as irrigation delivery systems, irrigation infrastructure, irrigation canals, or drainage ditches that lie within the boundaries of and are maintained by a port district or an irrigation district or company”. Is the FWHCA definition consistent with WAC 365 -190- 030(6 )? ☒ Yes ☐ No ☐ N/A Location in Text: 15.02.010 - Definitions PROTECTION OF FISH AND WILDLIFE HABITAT AND CONSERVATION AREAS Have you reviewed MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 185 Policies and regulations protect the functions and values of fish and wildlife habitat conservation areas. RCW 36.70A.172(1) and WAC 365 -190-030(6). WAC 365-190-130(4) says local jurisdictions must consult current information on priority habitats and species identified by WDFW. Additional information that must be consulted is available from DNR’s natural heritage program and aquatic resources program . BAS regarding biodiversity areas and corridors has advanced significantly. Recent updates and resources include: • Aquatic Habitat Guidelines • Priority Habitat and Species maps • Priority Habitats and Species List (updated J une 2023) • Priority Habitats and Species: Management recommendations: • Landscape Planning for Washington’s Wildlife (2009) • Land Use Planning for Salmon, Steelhead and Trout (2009) • Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (2020) • Riparian Ecosystems, Volume 2: Management Recommendations (2020) • Riparian Management Zone Checklist for CAOs (2023) • Shrub-Steppe Management Recommendations (2020) • Oregon White Oak Woodlands Ecosystems Management Recommendations (1998) • Management recommendations for Washington's Priority Species (by taxa) • Puget Sound Kelp Conservation and Recovery Plan (2020) • Stream Habitat Restoration Guideline s (2012) • Water Crossing Design Guidelines (2013) “Areas where endangered, threatened, and sensitive species have a primary association” must be considered per WAC 365-190-130(2)(a). Consult WDFW’s Threatened and Endangered Species list and U.S. Fish and Wildlife Service’s Information for Planning and Consultation resources for up to date information on all state and federal listed species. Also see the Puget Sound Pa rtnership’s Salmon Recovery website for Water Resource Inventory Area (WRIA ) Plans in Puget Sound. applicable changes in management recommendations for priority habitats and species? ☒ Yes ☐ No ☐ N/A Location in Text 15.22.470 – 15.22.490 Have you reviewed your regulations regarding any changes in species listings? ☒ Yes ☐ No ☐ N/A Location in Text 15.22.450.A.1 MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 186 DESIGNATING AND PROTECTING WATERS OF THE STATE RCW 90.48.020 defines waters of the state, which include all surface waters, salt waters, groundwater and all other water courses in Washington. WAC 365-190- 130(2)(f) recommends designating all waters of the state as fish and wildlife habitat conservation areas (FWHCAs). Stream types are classified in WAC 222-16-030 with field verification, or an alternate system that considers factors listed in WAC 365-190-130(4)(f)(iii). See http://www.dnr.wa.gov/forest-practices -water-typing to use Washington State Department of Natural Resources (DNR)’s stream typing system. Establish riparian management zones to maintain no net loss of riparian ecosystem functions and values. Designate areas that risk contaminating or harming shoreline resources including tidelands and bedland suitable for shellfish harvest, kelp and eelgrass beds and forage fish spawning areas. Do you designate waters of the state as FWHCAs? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.450.A.5 Do your regulations protect waters of the state? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.480 – 15.22.490 ANADROMOUS FISHERIES Policies and regulations for protecting critical areas give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries. RCW 36.70A.172(1) is the requirement and WAC 365-195- 925 lists criteria involved. This requirement applies to all five types of critical areas. WAC 365-190-130(4)(i) recommends sources and methods for protecting fish and wildlife habitat conservation areas, including salmonid habitat. Counties and cities may use information prepared by the United States Department of the Interior Fish and Wildlife Service, National Ma rine Fisheries Service, the Washington State Department of Fish and Wildlife, the State Recreation and Conservation Office, and the Puget Sound Partnership to designate, protect and restore salmonid habitat. Counties and cities should consider recommendations found in the regional and watershed specific salmon recovery plans (see the Governor's Salmon Recovery Office webpage and the Puget Sound Partnership’s Salmon Recovery webpage). Land Use Planning for Salmon, Steelhead and Trout: A land use planner’s guide to salmonid habitat protection and recovery (October 2009) is an excellent resource. Do your regulations give special consideration to anadromous fisheries? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.010 and 15.22.480 MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 187 REASONABLE USE EXCEPTIONS The Critical Areas Ordinance (CAO) allows for “reasonable use” if the CAO would otherwise deny all reasonable use of property. Reasonable use provisions should limit intrusions into critical areas to the greatest extent possible and apply the mitigation sequence as needed for no net loss of ecosystem functions and values RCW 36.70A.370. Common exemptions include emergencies, remodels that do not further extend into critical areas, surveying, walking, and development that has already been completed with critical areas review under a previous permit. See Critical Areas Handbook, Chapter 3: Structuring Critical Areas Regulations, p.10 (Updated 2022 ). Do you have reasonable use provisions? ☒ Yes ☐ No Location in Text: 15.22.100 AGRICULTURAL ACTIVITIES (COUNTIES ONLY) Non-VSP Counties Critical areas regulations as they specifically apply to agricultural activities in counties or watersheds not participating in the Voluntary Stewardship Program (VSP) have been reviewed, and if needed, revised pursuant to RCW 36.70A.130. RCW 36.70A.710(6) "Agricultural activities" means all agricultural uses and practices as defined in RCW 90.58.065. VSP C ounties After watershed work plan approval, VSP counties are encouraged to reference and describe their participation in the program within their critical areas development regulations (WAC 365-196-832). See Critical Areas Handbook, Chapter 5: Protecting Critical Areas in Natural Resource Lands (2022). Did you review your regulations as they apply to agricultural activities ? ☐ Yes ☐ No ☒ N/A Location in Text: MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 188 FOREST PRACTICES APPLICATION REGULATIONS If applicable, regulations for forest practices have been adopted: RCW 36.70A.570. RCW 76.09.240, requires many counties over 100,000 in population, and the cities and towns within those counties to adopt regulations for forest practices. These are often included in clearing and grading ordinances. Have you adopted f orest practices regulations? ☐ Yes ☐ No ☒ N/A Location in Text: GOOD IDEAS Non-regulatory measures to protect or enhance functions and values of critical areas may be used to complement regulatory methods. These may include: • public education • stewardship programs • pursuing grant opportunities • water conservation • joint planning with other jurisdictions and non-profit organizations • stream and wetland restoration activities • transfer of development rights Monitoring and adaptive management is encouraged in WAC 365-195-905(6) to improve implementation of your regulations. See Commerce’s Monitoring and Adaptive Management chapter in the Critical Areas Handbook , Chapter 7: Monitoring and Adaptive Management of Critical Areas (2022). Are you using non- regulatory measures to protect critical areas? ☒ Yes ☐ No Location in Text: Wetlands restoration activities are the preferred mitigation method as defined in 15.22.260. Do you have a monitoring and adaptive management program for your CAO? ☒ Yes ☐ No Location in Text: MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 189 Mitigation plan requirements include a monitoring program and contingency plan that will require corrective measures if performance standards are not being met. Section 15.22.140.E and F outline these requirements. Also, 15.22.510.B.8 MCA 26-0090 Exhibit 11 September 23, 2026 Planning Commission Regular Meeting 190 MCA 26-0090 Exhibit 12 DATE: June 24, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Relevant Resources Frequently Flooded Areas WAC 365-190-110 – Frequently flooded areas (https://apps.leg.wa.gov/WAC/default.aspx?cite=365-190-110) Department of Ecology guidance for floodplains (https://ecology.wa.gov/regulations-permits/guidance-technical-assistance/guidance-for- floodplains-critical-areas-ordinanc) Land Use Planning for Salmon, Steelhead and Trout (https://wdfw.wa.gov/sites/default/files/publications/00033/wdfw00033.pdf) Floodplain Habitat Assessment and Mitigation – Regional Guidance for the Puget Sound Basin (https://www.ecology.wa.gov/getattachment/b2847e38-b79a-4646-8d3a- 78d734f567f5/%EF%BF%BD%C3%BF%3Cfont%20color=) Fish and Wildlife Habitat Conservation Areas WA Department of Fish and Wildlife Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (https://wdfw.wa.gov/sites/default/files/publications/01987/wdfw01987.pdf) WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA Department of Transportation and WA Department of Fish and Wildlife, Washington Habitat Connectivity Action Plan (https://wdfw.wa.gov/sites/default/files/publications/02630/wdfw02630.pdf) September 23, 2026 Planning Commission Regular Meeting 191 MCA 26-0090 Exhibit 12 WDFW Riparian Management Zone Checklist for Critical Areas Ordinance – Addendum (https://wdfw.wa.gov/sites/default/files/2023-08/rmr-cao-checklistaddendum.pdf) Geologically Hazardous Areas WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA DNR Geologic Information Portal (https://dnr.wa.gov/washington-geological- survey/publications-and-data/geologic-information-portal) Critical Aquifer Recharge Areas Department of Ecology – Critical Aquifer Recharge Areas Guidance (https://apps.ecology.wa.gov/publications/summarypages/0510028.html) WAC 365-190-100 Critical Aquifer Recharge Areas (https://app.leg.wa.gov/wac/default.aspx?cite=365-190-100) Wetlands WA Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates (https://apps.ecology.wa.gov/publications/documents/2206014.pdf) WA Department of Ecology Washington State Wetland Rating System for Western Washington (https://apps.ecology.wa.gov/publications/documents/1406029.pdf) WA Department of Ecology Wetlands in Washington State Vol. 2: Guidance for Protecting and Managing Wetlands, July 2018 Modified Habitat Score Ranges (https://apps.ecology.wa.gov/publications/parts/0506008part3.pdf) WA Department of Ecology Characterizing Wetland Buffers in Washington State (https://apps.ecology.wa.gov/publications/documents/1706008.pdf) Comparable Jurisdictions Anacortes Critical Areas Ordinance Arlington Critical Areas Ordinance Bellingham Critical Areas Ordinance Gig Harbor Critical Areas Ordinance Mill Creek Critical Areas Ordinance September 23, 2026 Planning Commission Regular Meeting 192 MCA 26-0090 Exhibit 12 Oak Harbor Critical Areas Ordinance Port Townsend Critical Areas Ordinance Tumwater Critical Areas Ordinance September 23, 2026 Planning Commission Regular Meeting 193 Total Engagements YTD:% Change vs Last Year:Avg Daily Engagements YTD:% Timely Responses: Counter Visits = In-person front desk visits. Emails Sent = Messages sent through the permits inbox to applicants. Phone Calls = Customer phone calls logged. Timely Responses = Customer inquiries that receive a response within two business days of the initial contact. The CED Technicians have managed over 5,600 interactions so far this year, with nearly 98% of inquiries responded to within 2 business days. CED Customer Service Report - August 2026 +17.9%5,676 33.5 97.3% 28% 60% 12% Customer Engagement Counter Visits Emails Sent Phone Calls 1096 3309 1271 COUNTER VISITS EMAILS SENT PHONE CALLS Engagement Type –YTD 2026 YTD Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2025 464 553 640 644 730 594 617 571 690 750 526 668 2026 473 542 550 772 703 1087 763 786 400 500 600 700 800 900 1000 1100 To t a l I n t e r a c t i o n s Monthly Engagment Trend 0 200 400 600 800 1000 1200 Jan Feb Mar Apr May Jun Jul Aug Timely Response Rate -YTD Total Interactions Timely Responses September 23, 2026 Planning Commission Regular Meeting 194 Total Permits YTD:% Change vs Last Year:% Same-Day Processing YTD:% Timely Issuance YTD: Over-the-Counter permits are completed quickly averaging less than 1 business day from intake to issuance with about 85% processed the same day Same-Day Processing = Measures the time from when an application is received until fees are sent. Counted as “Same-Day” if fees are sent the same business day. Timely Issuance = Measures the time from when payment is received until the permit is issued. Counted as “Timely” if issued within one business day of payment. Note: Customer payment delays are not included in these times. CED Over-the-Counter Permit Report – August 2026 334 +35.2%85.0%97.0% 126 3 3 3 38 55 106 0 20 40 60 80 100 120 140 Vendor Inspection Only Fire Solar Plumbing Re-Roof/Re-Side Mechanical Permits by Type -YTD 88% 100% 86%83%83%88%88% 0% 20% 40% 60% 80% 100% Same-Day Processing Rate 17 28 27 28 29 35 32 51 28 27 27 23 27 40 27 31 60 36 54 59 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Permits Issued by Month Permits 2025 Permits 2026 0.0 0.2 0.4 0.6 0.8 1.0 1.2 0.6 0.5 0.6 1.0 0.8 0.4 0.8 Average Staff Time by Type (Days) September 23, 2026 Planning Commission Regular Meeting 195 *If we ask for more information about a project and the applicant takes longer than 60 days to respond, the City may add up to 30 extra days to the overall review time for the application, as allowed under Port Angeles Municipal Code (PAMC) 18.02.170(G) and (H). CED SB 5290 Report - Aug 2026 TYPE I - Allowed, Permitted, or Accessory Uses Not Requiring Notice of Application; Building Permits Categorically Exempt from SEPA; Business Licenses; Clearing and Grading Permits; Critical Area Exemptions; Director's Determinations¹; Electrical Permits; Environmentally Sensitive Area Permits and Extensions; Fee Waivers; Final Binding Site Plans; Final Boundary Line Adjustments; Final Overlay Zones; Final Planned Residential Development (PRD); Final Plats; Final Short Plats; Final Unit Lot Subdivisions; Fire Alarm Permits; Fire Permits – Any Other Approval Provided by the Fire Department – Office of the Fire Marshal; Fire Sprinkler Permits; Flood Development Permits; Home Businesses/Home Occupation Permit; Land-Use Verification; Minor Amendments to an Approved Plat, Binding Site Plan, or Planned Residential Development; Minor Deviations Up to 20%; Minor Mobile or Itinerant Vendor Hosting Site Plan Review; NICE Grants; Preliminary Boundary Line Adjustments; Preliminary Short Plats; Regulatory Mobile or Itinerant Vendor Permit; Reasonable Use Exceptions; Right- of-Way Construction Permits; Sales and Use Tax Grants; Shoreline Exemptions; Sign Permits; Short-Term Lodging Licenses; Site Plan Review; Temporary Uses Up to One Year; Utility Feasibility Requests; Wetland Permit Extension; Wetland Temporary Emergency Permit. TYPE II - Administrative Conditional Use Permits; Administrative Conditional Use Permits Required for Transitional Housing Facilities 1–4 Units; Building Permits Requiring SEPA; Cottage Industries; Discretionary Conditional Use Permits; Major Mobile or Itinerant Vendor Hosting Site Plan Review; Minor Plat Amendment; Minor Variances; Preliminary Binding Site Plan; Preliminary Unit Lot Subdivision; SEPA Review (Not Associated with a Public Hearing); Shoreline Substantial Development Permits²; Temporary Housing Facilities; Wetland Permits. TYPE III - Conditional Use Permits; Conditional Use Permits Required for Transitional Housing Facilities 5+ Units; Major Amendments to an Approved Plat or Planned Residential Development; Major Variances; Minor Deviations 21–30%; Plat Vacation; Preliminary Overlay Zones; Preliminary Plats; Preliminary Planned Residential Development (PRD); SEPA Review (Associated with a Public Hearing); Shoreline Conditional Uses; Shoreline Substantial Development Permits³; Shoreline Variances; Temporary Uses – One to Five Years; Unclassified Use – TYPE IV - Site S ecific Rezones. TYPE V - Amendments to Development Regulations; Amendments to the Port Angeles Municipal Code; Annexations; Area-Wide Rezones; Comprehensive Plan Amendments; Development Agreements; Master Land Use, Subarea, Functional, and/or Utility Plans and Amendments; Shoreline Master Program Adoption and Amendments. NOTES: 1. See PAMC 18.02.240 for applicable procedures. 2. Only if the application is for a permitted use and receives a threshold determination of non-significance. 3. Except for Type II shoreline substantial development permits. 16 4 4 0 0 0 2 4 6 8 10 12 14 16 18 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 Days Nu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type I (65 Day Deadline*) 0 0 1 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 Days Nu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type II (100 Day Deadline*) 0 0 0 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 Days Nu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type III (170 Day Deadline*) 0 0 0 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 DaysNu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type IV (170 Day Deadline*) 0 0 0 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 DaysNu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type V (No Deadline*) September 23, 2026 Planning Commission Regular Meeting 196 CED Affordable Housing Report - August 2026 Type JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2026 YTD 2025 YTD SUT - HB 1406 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUT - HB 1590 $0.00 $0.00 $0.00 $9,000.00 $91,006.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100,006.37 $50,000.00 FWP $97,226.99 $1,065.00 $31,983.63 $0.00 $35,265.00 $101,704.86 $970.20 $10,646.61 $0.00 $0.00 $0.00 $0.00 $278,862.29 $140,868.84 NICE- Small Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NICE - Medium Scale $0.00 $0.00 $0.00 $21,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $21,000.00 $0.00 NICE - Large Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $46,750.00 TOTAL CITY INVESTMENTS $97,226.99 $1,065.00 $31,983.63 $30,000.00 $126,271.37 $101,704.86 $970.20 $10,646.61 $0.00 $0.00 $0.00 $0.00 $399,868.66 $237,618.84 PRP 4 2 2 2 0 1 4 0 0 0 0 0 15 10 MFTE 0 4 4 0 0 0 0 8 0 0 0 0 8 4 Key SUT- HB 1406 SUT- HB 1590 FWP NICE - Small Scale NICE - Medium Scale NICE - Large Scale PRP MFTE Please Note: City staff invest considerable time to proactively engage with prospective housing developers in order to amplify these critical City programs. This report only includes one stage of this important process. Multi Family Tax Exemption. Contracts are shown in the month they were executed between developer and City, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the New Improvements for Community Enhancement of Neighborhoods Projects (≤ $14,999). Grants are shown in the month that the contract was fully executed between the developer and the City. New Improvements for Community Enhancement of Neighborhoods Projects ($15,000-$24,999). Grants are shown in the month that the contract was fully executed between the developer and the City. New Improvements for Community Enhancement of Neighborhoods Projects (≥ $25,000). Grants are shown in the month that the contract was fully executed between the developer and the City. Permit Ready Plans. Plans are shown in the month they were shared with prospective developer, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the monthly Building September 23, 2026 Planning Commission Regular Meeting 197 CED Building Report - August 2026 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2025 YTD 0 0 1 0 1 0 1 0 0 0 0 0 4 $0.00 $0.00 $3,000.00 $0.00 $8,268.00 $0.00 $85,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,070,222.00 2 2 6 9 7 6 8 8 0 0 0 0 51 $8,007.00 $11,713.00 $116,130.00 $841,149.00 $151,714.00 $219,289.00 $728,935.00 $275,280.00 $0.00 $0.00 $0.00 $0.00 $1,998,122.00 Certificate of Occupancy 1 0 0 0 0 0 0 0 0 0 0 0 N/A 1 0 1 1 0 0 1 0 0 0 0 0 0 $7,000,000.00 $0.00 $1,019,685.00 $3,100,000.00 $0.00 $0.00 $186,650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 1 0 0 0 0 0 0 0 0 0 2 $0.00 $0.00 $4,500,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,702,099.00 Certificate of Occupancy 0 0 0 0 0 0 0 0 0 0 0 0 N/A 0 0 0 0 0 0 0 0 0 0 0 0 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $56,000,000.00 0 0 0 0 0 0 0 0 0 0 0 0 4 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,021,000.00 Certificate of Occupancy 0 0 0 0 0 0 0 0 0 0 0 0 N/A 4 0 2 0 1 4 0 0 0 0 0 0 5 $2,120,000.00 $0.00 $327,936.00 $0.00 $680,190.00 $2,120,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,284,827.00 2 2 0 0 2 0 7 0 0 0 0 0 6 $407,313.00 $130,000.00 $0.00 $0.00 $267,680.00 $0.00 $475,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $884,034.00 1 0 4 0 1 1 0 0 0 0 0 0 10 $224,352.00 $0.00 $515,807.00 $0.00 $400,000.00 $632,337.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,848,821.00 1 0 2 1 2 3 3 0 0 0 0 0 7 $170,517.00 $0.00 $86,690.00 $20,000.00 $105,552.00 $577,000.00 $185,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $545,322.00 19 32 18 31 29 32 30 28 0 0 0 0 249 $251,345.00 $322,685.00 $201,849.00 $557,995.00 $753,323.00 $508,882.00 $513,627.00 $468,045.00 $0.00 $0.00 $0.00 $0.00 $3,901,838.00 Certificate of Occupancy 2 0 0 0 0 0 2 3 0 0 0 0 N/A Comm 0 0 2 0 1 0 4 0 0 0 0 0 6 Res $0.00 $0.00 $15,200.00 $0.00 $7,734.00 $0.00 $15,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85,880.00 30 36 37 42 44 46 56 39 0 0 0 0 345 $10,181,534.00 $464,398.00 $6,786,297.00 $4,519,144.00 $2,374,461.00 $4,057,508.00 $2,189,212.00 $743,325.00 $0.00 $0.00 $0.00 $0.00 $72,342,165.00 $106,793.40 $20,095.63 $100,441.68 $89,033.73 $44,118.65 $62,333.96 $51,832.20 $18,546.35 $0.00 $0.00 $0.00 $0.00 $860,668.80 3 2 4 2 4 2 1 1 0 0 0 0 20 0 0 1 0 1 2 0 0 0 0 0 0 4 2 3 8 0 4 0 2 8 0 0 0 0 0 0 22 6 10 1 0 4 0 1 1 0 0 0 0 0 0 7 0 10 2 2 0 0 2 0 7 0 0 0 0 0 13 4 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 2 9 0 6 11 7 0 0 0 0 0 46 12 29 19 Demolition and Moving Repair and Alteration 219 $3,577,751.00 $493,195.60 $31,315,879.00 7 $37,934.00 330 12 $1,144,759.00 7 $0.00 0 0 $0.00 11 $5,248,126.00 13 $1,279,993.00 7 $1,772,496.00 4 $11,306,335.00 0 0 $4,500,000.00 1 2026 YTD 3 $96,268.00 1 48 $2,352,217.00 italics are at various stages of staff review. Additionally, not all applicants have submitted a complete application at this time. While we expect the majority to advance through the review process, it is possible that some may experience the need for additional review. Total Dwelling Units New Single Family New Accessory Structure Res Dwelling Units - Duplex New Construction New Multi Family New Manufactured Home Business Certificate of Occupancy Permit Fees Paid Total Permits Issued Total Construction Valuation Repair and Alteration Comm Ind Public New Construction New Construction Repair and Alteration Repair and Alteration September 23, 2026 Planning Commission Regular Meeting 198 MCA 26-0090 Critical Areas Ordinance (CAO) Public Hearing September 23, 2026PLANNING COMMISSION 1 Background •10-year Comprehensive Plan Periodic Update required by the GMA •Critical Areas Ordinance update additional requirement. •Ensure all state legislative requirements are met by local code. •Look at internal and external environmental compliance and procedures. •Opportunity to improve clarity and reduce confusion around development regulation. September 24, 2026PLANNING COMMISSION 2 Overview •Provide clear pathways for activities and uses within critical areas. •Inclusion of best available science. •Protection of public health, safety and welfare. •Protection unique, fragile, and vulnerable elements of the environment. September 24, 2026PLANNING COMMISSION 3 Procedure •January 28, 2026 – PC adoption of the 2026-2028 Planning Commission Workplan •May 27, 2026 – Introduction to Phase 2, Critical Areas Ordinance •April – August, 2026 – Internal kickoff, scoping, audit, drafting, internal and external engagement •June – August, 2026 – Planning Commission review of draft amendments September 24, 2026PLANNING COMMISSION 4 Procedure •August 25, 2026 – City Council Work Session •September 23, 2026 – Planning Commission public hearing and recommendation •October 20, 2026 – City Council first reading •November 17, 2026 – City Council second reading and adoption September 24, 2026PLANNING COMMISSION 5 Environmental Review: Categorically exempt from the requirements of the State Environmental Policy Act under RCW 43.21C.450(1) and RCW 43.21C.450(3). Goals Goal 1 – Complete a CAO update that complies with GMA periodic update requirements and the inclusion of best available science. Goal 2 – Redevelop Title 15 to provide administrative clarity for both the community and members of the city team. September 24, 2026PLANNING COMMISSION 6 Goals Goal 3 – Amend Title 15 to contain established methods, rules, and sequences of action to ensure procedural consistency. Goal 4 – Improve public usability and long-term implementation through handbooks, BMPs, and FAQs. September 24, 2026PLANNING COMMISSION 7 Outreach and Engagement •Dedicated website to MCA 26-0090 – May, 2026 •Builder’s Roundtable Introduction – May, 2026 •Stakeholder Committee Meetings – June – August, 2026 •Planning Commission Review and Discussions – June – August, 2026 •KONP Todd Ortloff Radio Appearance – August 5, 2026 •City Council Work Session – August 25, 2026 •Planning Commission Public Hearing – September 23, 2026 September 24, 2026PLANNING COMMISSION 8 Proposed Updates •Moving away from “environmentally sensitive areas” to “critical areas” •Reclassification of marine bluffs and ravines to geologically hazardous areas •Addition of regulation for critical aquifer recharge areas and fish and wildlife habitat conservation areas •Consolidation of definitions applicable to critical areas into one location •Establishing Articles I - VII September 24, 2026PLANNING COMMISSION 9 Chapter 15.22, Article I – General Provisions •Provides clarity around critical areas permitting provisions. •Improves understanding of GIS mapping and screening tools and how they are used. •Clarifies “exemptions”, “allowed uses”, “permitted uses” and exceptions”. September 24, 2026PLANNING COMMISSION 10 Article II – Critical Areas Review Procedures •Critical area reports and minimum report requirements. •Mitigation sequencing and mitigation plans. •Establishment of critical area tracts and temporary and permanent field markings. •Financial guarantees, unauthorized critical area modifications, final decisions & appeals. September 24, 2026PLANNING COMMISSION 11 Article III - Wetlands •Updating buffer widths based on best available science from Department of Ecology •Addition of “moderate” land use impacts •Buffer width determined by the wetland category, intensity of impacts, and wetland functions or special characteristics September 24, 2026PLANNING COMMISSION 12 August 26th Motion Select Option 3 as the preferred Wetland Buffer methodology and include exceptions listed from WAC 365-195-915. September 24, 2026PLANNING COMMISSION 13 Staff Response •Departures from WAC 365-195-915 must have a valid, scientific reason listed on the record that justifies a different policy choice. •Examples of accepted deviations: •Essential public facilities •Emergency access or public safety •Tribal cultural resource protections •Conflicts with other legal obligations September 24, 2026PLANNING COMMISSION 14 Staff Response •Reasons departures were rejected: •Longstanding buffers performed adequately •Unsupported speculations on outcomes •Selecting weaker science to achieve a desired outcome •Using scientific uncertainty to justify weaker protections September 24, 2026PLANNING COMMISSION 15 Staff Response •Lacking capacity to develop a valid scientific reason for deviating from the requirements of RCW 36.70A.172. •The best available science provided by state and federal agencies will continue to be used for this update. September 24, 2026PLANNING COMMISSION 16 Article IV – Critical Aquifer Recharge Areas •CARAs – areas with a critical recharging effect on aquifers used for potable water. •Currently not used for that purpose within City Limits. •Unanimous consensus from City Council for regulating uses in CARAs. September 24, 2026PLANNING COMMISSION 17 Article V – Frequently Flooded Areas •Floodplains and other areas subject to flooding. •Based on FEMA Flood Insurance Risk Maps. •Protection of ecological functions and values while protecting buildings, infrastructure, and people from flood risk. •Chapter 15.12 – Flood Damage Prevention. •Reporting must include a habitat assessment. •Identifies the impact of proposed development on the floodplain and instream habitat. September 24, 2026PLANNING COMMISSION 18 Article VI – Geologically Hazardous Areas •Landslide, erosion, seismic hazard areas, such as marine bluffs and stream ravines. •Reduce risk of damage to structures and property. •Allow for natural geologic processes that support and maintain fish and wildlife habitat. •Special consideration given to climate change risks. September 24, 2026PLANNING COMMISSION 19 Erosion and Landslide Areas •Minimum buffer of 50 feet: increase from 25-feet for “ravines” •Special consideration given to stormwater management •Geologic hazards assessment and geotechnical report requirements September 24, 2026PLANNING COMMISSION 20 Viewshed Enhancements •No significant changes made to existing regulation. •Minor addition of defining pruning cuts to be used – reduction and window pruning. •Permitting requirements remain the same. •Lands on which the work is to be done must be approved by the property owner – always a requirement for permit approval. September 24, 2026PLANNING COMMISSION 21 Article VII – Fish and Wildlife Habitat Conservation Areas •FWHCAs – critically important to maintenance of certain fish, wildlife and/or plant species populations •All creeks, kelp and eelgrass beds, and any area designated as having endangered, threatened, and sensitive species or habitats •Special consideration given to anadromous fisheries including riparian corridors and nearshore habitat •Establishment of adequate buffer zones to limit incompatible uses using Site Potential Tree Height September 24, 2026PLANNING COMMISSION 22 Public Comment Questions and comments from the following: •Planning Commission •City Council •Stakeholder Advisory Committee •Verbal and written public comments September 24, 2026PLANNING COMMISSION 23 Changes made since August •Scrivner’s errors and minor changes to definitions for clarity and consistency with WAC and RCW •Completed Article IV – CARAs •Completed development standards and report requirements for frequently flooded areas September 24, 2026PLANNING COMMISSION 24 Comprehensive Plan Analysis •Consistency with Land Use, Conservation, Hazard Mitigation & Climate Resiliency, and Utilities & Public Services Elements •Goals and policies provide direction for critical areas protection, environmental resilience, water quality and development review provisions September 24, 2026PLANNING COMMISSION 25 Climate Resiliency Plan •Community Resilience and Wellbeing •Water supply monitoring & enhancement •Sea level rise vulnerability assessment •Comprehensive plan priorities •Ecosystem Health •Forest and marine habitat preservation •Urban tree canopy, parks, and open space •Native plant landscaping •Critical area protection •Coastal erosion reduction •Salmon habitat protection •Land-based pollutant reduction September 24, 2026PLANNING COMMISSION 26 Housing Action Plan •Not primary policy basis for MCA 26-0090 •Balance between proper siting of development for sustainable homes and the environment •Weatherization and repair programs produce environmentally sound and sustainable homes September 24, 2026PLANNING COMMISSION 27 Implementation •CAO Management Handbook for property owners. •Updated mapping to be made publicly available. •Updated Environmental Planning landing webpage, including FAQ’s and links to handbooks. September 24, 2026PLANNING COMMISSION 28 Conclusions 1.Analysis/findings of fact based on draft code, adopted plans, public comment and other materials for review. 2.Citywide legislative actions affecting Title 15. 3.Proposed amendments are organizational, procedural, and adhere to best available science. September 24, 2026PLANNING COMMISSION 29 Conclusions (continued) 4.Improves administrative clarity by providing clear regulation for each of the five critical areas. 5.Consistent with adopted Comprehensive Plan policies addressing protection of critical areas, open space, and land use planning. 6.Legislative and citywide independent of future permit review under applicable City regulations. September 24, 2026PLANNING COMMISSION 30 Recommendation Planning Division recommends that the Planning Commission recommend approval of Municipal Code Amendment 26-0090 to the City Council. September 24, 2026PLANNING COMMISSION 31