HomeMy WebLinkAbout4.592 Original Contract 4.5q~ PROJECT MANUAL Front St. Emergency Repairs Project No. 30345-008 SCOPE OF WORK The project consists of the repair of approximately 40 feet by 85 feet of roadway on Front Street (US 101) by the placement of 6" of A TB in the shoulder area and 5" of HMA 12" asphalt overlay and installation of approximately 45 feet of curb and gutter. The project shall include providing lighting for the placement of the ATB and HMA. The curb and gutter shall be placed within three (3) calendar weeks of the executed contract. All other traffic control will be provided by the City of Port Angeles. All work to complete the project including the furnishing of all material, labor and equipment to remove and replace all material shall be included in the bid price to do the work. This contract incorporates the Washington State Department of Transportation's 2008 Standard Specifications for Road, Bridge, and Municipal Construction (English Units), referred to herein as the Standard Specifications. See the attached Location, Site and/or detail maps for more information. ADDITIONAL REQUIREMENTS List all additional requirements; below is a typical list: 1. Questions may be directed to Jim Mahlum, at 360-417-4701. 2. The most recently issued Washington State Prevailing Wage Rates for Clallam County, a copy of which is attached to this Project Manual, shall apply to this Contract. These can be accessed on the internet at www.lni.wa.qov/orevailinqwaae/Default.htm. 3. The Project has been declared an emergency by the City Manager, Jerry Osterman, on September 8, 2008 and has accepted the unit bid from Lakeside Industries as verbally submitted on September 9,2008. The accepted work is for paving to be completed on the evening of September 9,2008 as weather permits. 4. A retainage will be required for this work. 5. The performance period for the paving is to be completed by 8:00 AM September 10,2008 all remaining work is to be completed by September 30,2008. BID FORM Front St. Emergency Repairs Project No. 30345-008 The bidder hereby bids the following amounts for all work (including labor, equipment, time and materials) required to remove and replace asphalt concrete pavement and related work as required in the Scope of Work. Item Spec. Description Qty Unit Unit Price Amount 1 5-04 ATB 30 Ton $235.00 $ 7,050.00 2 5-04 HMA%" 115 Ton $265.00 $30,475.00 3 8-04 ' Cub & Gutter 1 LS $2,000.00 $ 2,000.00 Total Bid $ 39,525.00 The bidder hereby-acknowledges that it has received Addenda No(s). ~ I~ (Enter "N/A" if none were issued) to this Project Manual. The name of the bidder submitting this bid and its business phone number and address, to which address' all communications concerned with this bid and with the contract shall be sent, are listed below. Bidder's firm name, ~~~1.l,r;.~ /J~ ~ Complete address J (p?&A~ ~11~~~11 ~ 1~f:.vt1 d8, (Street address) ~~ f111\<l1oh A IAJA qg3~6- (CltyYA ~ (State) (Zip) Registration No. 1 ~f.,S.:r- ~ ~, Ll'Jb . UBI No. (pDt l?Jfo ~l.Jl Employment Security No. 4IScJ;);)1:P3 Industrial Ins. Acct. No. '7f)D,~d' State Excise Tax No. ~ 0 , ~ / D fr; . <( \.I~ Telephone No. 3(00 - '-l~ -1~03 Signed by r~ ~~/ Title ~/~ Printed Name: GE()1.6~. ~ PUBLI~1>>>'ORKS CONTRACT This Contract is made and entered into in duplicate thIS q+'-- day of S"rtl't4.... , " 20~, by and between the City of Port Angeles, a non-charter code city of the State of Washington, hereinafter referred to as "the City", and, l--A~.s., ~E ~fo.S'b 7~~' " a WA.&~ \-0",- Corporation, hereinafter referred to as "the Contractor", WITNESSETH: Vlhereas, the City desires to have certain publIc work performed as hereinafter set' fOrth, requiring specialized skills ancfother supportive capabilIties; and Whereas, the Contractor represents that it is qualified and possesses s'..lfficient skills 'and the necessary capabiliti~s to p~rform the services set forth inthis Contract. NOW, THEREFORE, in, consideration of the' terms, conditions, and agreements contained herein, the parties hereto agree as follows: 1. Scope of Work. The Contractor shall do all work and fumishall tools, materials, and equipment in order to accomplIsh the following' proj'~ct: ' , Front St. Emergency Repairs Project No. 30345aOOB m accordance with and as described in Section 1-1.3 of the Washington State Department of Transportation Standard Specifications, and shall perform any alteratIOns in or additions t,) ,the work provided under this Contract and every part thereof. The Contractor shall provide and bear the expense of all eqUIpment, work, and labor of any sort ' whatsoever that may be required for the transfer of materials and for constructing and completing' the work provided for in this Contract, except as may otherwise be provided in the Project Manual. 2. Time for Performance and Liquidated Damages. a. Time is of the essence in the performance of this Contract and in adhering to the time frames specified herem. The Contractor shall commence work on Septt:mber 9, 2008 and said work shall be physically completed wIthin three (3) calendar weeks after commencing work, unless a different time frame is expressly provided in writing by the City. 3. Compensation and Method of Payment. a. Tht: City shall pay the Contractor for work performed undel this Contract as detailed in the bid, at the cO!l}p~etlOn of work and submission of a detailed lllVOlce. b. Payments for any alterations in or additions to the work provided under this ~ontract shall be on a negotiated time and materials basis. , . 4. Independent Contractor RelationshlP. It. The relationship created by this Contract is that of independent contracting entities. No agent, employee, servant, or representative of the Contractor shall be deemed to be an employee, agent, servant, or representative ofthe City, and the employees of the Contractor are not entitled to, any of the benefits the City provides for its employee!). The Contractor shall be solely and' entirely responsible for its acts and th~ ~cts of Its agents, employees, servants, subcontractors, or representatives during the performance of this Contract. The Contractor shall assume full responsibility :for .payment of all wages and salarie$ and all federal, state, and local taxes or ' contributions imposed or required, incl~ding, but, not limited to, unemployment insurance, workers compensation insurance, social security, and income tax withholding. 5. Prevailing Wage Requirements. ~- : \ ~ > I 1 The Contractor shall comply with applicable, prevailing wage requirements of the Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and Chapter 296-127 WAC,. The Cqntra<;tor shall document compliance with said requirements and shall file with the City appropriate affidaVIts, certificates, and/or statements of compliance with the State prevailing wage requirements. The Washington State Prevailing Wage Rates FoOr Public Works Contracts, Clallam County, incorporated in thi~ Contract have been established by the Department of Labor & Industries and are included as an Atta~hment to this Contract. The Contractor shall also ensure that any subcontractors or' agents of the Contractor shall comply with,tre l?rfiva~~ing wage and documentation requirements as ser forth herein. 6. I ~ ) 'I ' , , Indemnification and Hold Harmless. ;\ I , , a. '[ ,The Contractor shall defend, indemnify, and hold harmless the City, its officers, officials, employees, and volunteers against and from any and all claims, injuries, damages, losses, or suits" including attorney 'fees, arising out of or in connection with the performance of this Contract, except for i~juries and damages caused by the sole negligence of the City. b. Should a court of competent jurisdiction determine that this Contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or dam~g~s tD property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemmfication. ThIS waiver has been mutually negotiated by the parties. The provisions .of this section shall survive the expiration or termination of this Contract. 7> Insurance. ~~'\:'~?~i The insurance coverage shall ~b~ in accordance' '\Vith and as described in the Washington State Department of Transportation Standard Specifications DIvIsion 1-07.18. A. VerificatlOn of Coverage The Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including, hut not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability msurance of the Contractor before commencement of the work. Before any exposure to loss may occur, the Contractor shall .file with the City a ,copy of the Builders Risk insurance policy that includes all applicable conditions, exclusions, definitions, terms and endorsements related to this proj ect. B. Subcontractors The Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates for each subcontractor. All, coverages for subcontractors shall be subject to all of the same insurance requirements, as stated herein for the Contractor. 8. Compliance with Laws. a. The Contractor shall comply with all applicable federal, state, and local laws, including regulations for licensing, certificatio~, and operation of facilitIes and programs, and accreditation and licensing of individuals, and any other standards , or criteria as set forth in the Project Manual. ", b. The Contractor shall pay any apphcable business and permit fees and taxes which may be required for the performance of the work. c. The Contractor shall comply with all legal and permitting requirements as set forth in the Proj ect Manual. 9. Non-discnmination. Non-discrimination shall be in accordance with and as described in the Washmgton State Department of Transportation Specifications Division 1-07.11. 10. Assignment. a. The Contractor shall not assign thIS Contract or any interest herein, nor any money due to or to become due hereunder, without first obtaining the written consent of the City, nor shall the Contractor subcontract any part ofthe services to be performed hereunder wIthout first obtaining the consent of the City. b. The Contractor hereby assigns to the City any and all claims for overcharges resulting from antitrust vIOlations as to goods and materials purchased in connection with this Contract, except as to overcharges resulting from antitrust violations commencing after the date of the bid or other event establishing the price of this Contract. In addition, the Contractor warrants and represents that each of its suppliers and subcontractors shall assign any and all such claims for overcharges to the CIty in accordance with the terms of this provision. The Contractor further agrees to give the CIty immediate notice of the existence of any. such claim. 11. Contract Administration. This Contract shall be administered by ;V1rJ>J <1 1JAfl/l~n behalf of the Contractor and by James M. Mahlum, Civil Emdneer on behalf of the CIty. Any wntten notices required by the terms of this Contract shall be served or mailed to the following addresses: Contractor: ~ ( ~ ~ (.L. S"'f'{l.(t:s J:i.,K:!... ~o ~ 1 d8 ...pc 0 th.K:,f;L~ (..,aq q ~ ~<p ~ City: City of Port Angeles P.O. Box 1150 321 East Fifth Street Port Angeles, W A 98362-0217 12. Interpretation and Venue. This Contract shall be interpreted and construed in accordance with the laws of the State _ of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed- the day and year first set forth above. . ' CONTRACTOR: Lakeside Industries Name of Contractor By:C- ~~~. Title: m~~_ \.... /oj) '- ' CITY OF PORT ANGELES: ,I" , By: ~l. O~- ~ I City Manager Attest: b~ JJ.rW "- CIty er Washington State Department of labor and Industries Policy Statement (Regarding the Production of "Standard" or "Non-standard" Items) Below IS the department's (State L&l's) list of criteria to be used in determining whether a prefabricated item IS "standard" or "non-standard" For Items not appearing on WSDOT's predetermined list, these criteria shall be used by the Contractor (and the Contractor's subcontractors, agents to subcontractors, suppliers, manufacturers, and fabricators) to determine coverage under RCW 39.12 The production, In the State of Washington, of non-standard items IS covered by RCW 39.12, and the production of standard Items IS not. The production of any Item outside the State of Washington is not covered by RCW 39 12. 1 Is the Item fabricated for a public works proJect? If not, It IS not subject to RCW 39 12 If it is, go to question 2. 2. Is the Item fabricated on the public works Jobsite? If It IS, the work is covered under RCW 39 12 If not, go to question 3 3. Is the Item fabricated in an assembly/fabrication plant set up for, and dedicated primarily to, the public works project? If It IS, the work is covered by RCW 39 12. If not, go to question 4. 4. Does the Item require any assembly, cutting, modification or other fabrication by the supplier? If not, the work IS not covered by RCW 39.12 If yes, go to question 5. 5. Is the prefabricated item intended for the public works project typically an inventory item which could reasonably be sold on the general market? If not, the work is covered by RCW 39.12. If yes, go to questIon 6. 6. Does the specIfic prefabricated Item, generally defined as standard, have any unusual characteristics such as shape, type of material, strength requirements, finish, etc? If yes, the work IS covered under RCW 39.12. Any firm with questions regarding the policy, WSDOT's Predetermined LiSt, or for determinations of covered and non-covered workers shall be directed to State L&I at (360) 902-5330 Supplemental to Wage Rates 1 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator Below IS a list of potentially prefabncated Items, onglnally furnished by WSDOT to Washington State Department of Labor and Industnes, that may be considered non- standard and therefore covered by the prevailing wage law, RCW 39 12 Items marked with an X In the "YES" column should be considered to be non-standard and therefore covered by RCW 39 12 Items marked with an X in the "NO" column should be considered to be standard and therefore not covered Of course, exceptions to this general list may occur, and in that case shall be evaluated according to the cntena descnbed in State and L&I's policy statement. ITEM DESCRIPTION YES NO Metal rectangular frames, solid metal covers, herringbone grates, and bl-directlonal vaned grates for Catch Basin Types 1, 1 L, 1 P, and 2 and Concrete Inlets See Std. Plans x 2 MetaTCircular fram-es(rlngs) an-d e<:n,ers,-circular-grafes; and prefabncated ladders for Manhole Types 1, 2, and 3, Drywell Types 1, 2, and 3 and Catch Basin Type 2 See Std. Plans 3. Prefabrbrted steel grafe.supports an-d welded gra-fes,---- - metal frames and dual vaned grates, and Type 1, 2, and 3 structural tubing grates for Drop Inlets See Std. Plans. x x ---- 4 Concrete Pipe - Plain Concrete pipe and reinforced concrete pipe Class 2 to 5 sizes smaller than 60 Inch diameter x _~ u_ _ _ _~_ __ _ _ __ __ ____ __ _ _ _ _____ _ _ _________ ___ _ _ __ _ ___ ~ _ _ _ _ _ _____ ___ _ __ _ 5. Concrete Pipe - Plain Concrete pipe and reinforced concrete pipe Class 2 to 5 sizes larger than 60 inch diameter x 6 Corrugated Steel Pipe - Steel lock seam corrugated pipe for culverts and storm sewers, sizes 30 Inch to 120 Inches In diameter. May also be treated, 1 thru 5. x 7. Corrugated Aluminum Pipe - Aluminum lock seam corrugated pipe for culverts and storm sewers, sizes 30 Inch to 120 inches In diameter. May also be treated, #5 x Supplemental to Wage Rates 2 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator ITEM DESCRIPTION YES NO 8 Anchor Bolts & Nuts - Anchor Bolts and Nuts, for mounting sign strtlctures, lumlnanes and other items, shall be made from commercial bolt stock See Contract Plans and Std. Plans for size and matenal type 9 -- - ----- --------- -- - ------ -- ---- ------ Aluminum Pedestnan Handrail - Pedestnan handrail conforming to the type and material specifications set forth in the contract plans Welding of aluminum shall be in accordance with Section 9-28 14(3). 10 ____ ____ - ____ __ - ____ __ - ___ - - _n _ _ __ ____ _ __ _ ____ Major Structural Steel Fabncation - Fabrication of major steel Items such as trusses, beams, girders, etc , for bndges - -- -- --- - - - -- - --- - -- - ---- ------- 11. Minor Structural Steel Fabrication - Fabncatlon of minor steel Items such as special hangers, brackets, access doors for structures, access ladders for irrigation boxes, bridge expansion jOint systems, etc , involving welding, cutting, punching and/or boring of holes. See Contact Plans for item descnption and shop drawings. 12. Aluminum Bndge Railing Type BP - Metal bndge railing conforming to the type and material specifications set forth in the Contract Plans. Welding of aluminum shall be in accordance with Section 9-28.14(3) x _ {_ _ _ _ __ _______ L_ __ x x x x I 1j---ConcretePI~ ng--Precast-Pres-tressedcorlcrete pllTngfor- useas 55- i ----- - ___ and 70 ton concrete piling Concrete to conform to i Section 9-19 1 of Std Spec ! X _ ____ __________ __________ _________ _______ _ ______________ _______________ ________1.______ _____n__ 14 Precast Manhole Types 1,2, and 3 with cones, adjustment : X sections and flat top slabs. See Std. Plans 15. Precast Drywell Types 1,2, and with cones and adjustment Sections See Std Plans. 16. Precast Catch BaSin - Catch Basin type 1, 1 L, 1 P, and 2 With adjustment sections See Std. Plans Supplemental to Wage Rates X -1- -------- ---- --- -- - < I X 3 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator ITEM DESCRIPTION YES NO 17 Precast Concrete Inlet - with adjustment sections, See Std Plans 18 Precast Drop Inlet Type 1 and 2 with metal grate supports See Std Plans. x x x , - --- -----~----~------------ ------~------ --~--------~---------------~------- -~---- ---.------ ------- --------- i I 19 Precast Grate Inlet Type 2 with extension and top units. See Std. Plans x x , -------------------~------------------~---------~-- ----------------------- -------- 22 Vault Risers - For use with Valve Vaults and Utilities I Vaults. X 20 Metal frames, vaned grates, and hoods for Combination Inlets. See Std. Plans I I I ____~___ _ _-1_ _ __ - --- 21 Precast Concrete Utility Vaults - Precast Concrete utility vaults of various sizes. Used for in ground storage of utility facilities and controls. See Contract Plans for size and construction requirements Shop drawings are to be provided for approval prior to casting 23 Valve Vault - For use with underground utilities See Contract Plans for details. Precast Co-ncrete Ba-n-Ier- - P-recast Concrete Barrier for - -- use as new barrier or may also be used as Temporary Concrete Barrier Only new state approved barrier may be used as permanent barrier. 24. 25 - ~-- --- -- ---- - - - - -- -- -- - - - -- -- - ----- -- - - - - -- --- ---- - - - Reinforced Earth Wall Panels - Reinforced Earth Wall Panels in size and shape as shown in the Plans Fabrication plant has annual approval for methods and materials to be used. See Shop Drawing Fabrication at other locations may be approved, after faCilities Inspection, contact HQ. Lab. 26 __ _____u______ ______ _ _ _ _____ __ _ ______ ________ ____ Precast Concrete Walls - Precast Concrete Walls - tilt-up wall panel in size and shape as shown In Plans Fabrication plant has annual approval for methods and materials to be used Supplemental to Wage Rates x x x x 4 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator ITEM DESCRIPTION YES NO 27. Precast Railroad Crossings - Concrete Crossing Structure Slabs - -- - --- - -- -- - - --- ------- -------- --- - -- --- - 12, 18 and 26 Inch Standard Precast Prestressed Glrder- Standard Precast Prestressed Girder for use.ll,l structures Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be proVided for approval prior to casting girders See Std. Spec Section 6-02 3(25)A 28 29. -Prestressed Con-crete-Girder-Series 4-f4 - Prestressed Co'ncrete- Girders for use in structures. Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be provided for approval prior to casting girders. See Std. Spec Section 6-02.3(25)A 30 Prestressed TrI-Beam Girder - Prestressed Tri-Beam Girder s for use in structures Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be provided for approval prior to casting girders See Std. Spec. Section 6-02.3(25)A 31 Prestressed Precast Hollow-Core Slab - Precast Prestressed Hollow-core slab for use in structu'res.. Fabric~tor plant has annual approval of methods and materials to be used Shop Drawing to be provided for approval prior to casting girders See Std. Spec. Section 6-02.3(25)A. 32. Prestressed-Bulb Tee Girder - Bulb Tee Prestressed Girder for use In structures Fabricator plant has annual approval of methods and materials to be used. Shop Drawing to be proVided for approval prior to casting girders. See Std Spec Section 6-02.3(25)A 33 Monument Case and Cover See Std. Plan Supplemental to Wage Rates x x x x x x x 5 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator ITEM DESCRIPTION YES NO 34 Cantilever Sign Structure - Cantilever Sign Structure fabncated from steel tubing meeting AASHTO-M-183 See Std. Plans, and Contract Plans for details. The steel structure shall be galvanized after fabncation In accordance With AASHTO-M-111 - - - --~-- - - -- - 35 Mono-tube Sign Structures - Mono-tube Sign Bridge fabricated to details shown in the Plans Shop draWings for approval are required pnor to fabrication --- -- ----- ------------ ------ --- - ---- 36 Steel Sign Bridges - Steel Sign Bndges fabncated from steel tubing meeting AASHTO-M-138 for Aluminum Alloys See Std. Plans, and Contract Plans for details. The steel structure shall be galvanized after fabrication In accordance With AASHTO-M-111 37. Steel SIgn Post - Fabricated Steel Sign Posts as detailed in Std Plans. Shop drawings for approval are to be provided pnor to fabrication -- ----- - -- - -- - - ---~---- - - ---- - ---- - --- 38 Light Standard-Prestressed - Spun, prestressed, hollow concrete poles 39 Light Standards - lighting 'Standards for use' on highway illumination systems, poles to be fabncated to conform With methods and matenals as specified on Std Plans. See Specia Provisions for pre-approved drawings - ------1- x x x - ------ , x x x 40-TraffTCSlg'narStanda'rds~-Traffic Sfgnal Stana'arcfs'furuse-on- '~-r-' --".-. . -.-. highway and/or street signal systems. Standards hbe fabricated ~ X to conform with methods and matenal as specified on Std. Plans. I .n.____~~e ~p~~lC!LProv~~I(:>ns_f9SJ~re-aI2Qroved d rawlng~. .__________ 00_.1_ ._~,__..__ 41. Precast Concrete Sloped Mountable Curb (Single and DualFaced) : See Std Plans. ! X Supplemental to Wage Rates 6 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator ITEM DESCRIPTION YES NO 42 Traffic Signs - Pnor to approval of a Fabncator of Traffic Signs, the sources of the following matenals must be submitted and approved for reflective sheeting, legend matenal, and aluminum sheeting. NOTE: *** Fabncatlon inspection required. Only signs tagged "Fabncatlon Approved" by WSDOT Sign Fabncatlon Inspector to be installed x x Std Custom Sl n1n Message g 9 . .. ....____...__._. _~.es~age_ 43 Cutting & bending reinforcing steel x --- - --...... ------- -- -- --- X X - .. --- CuslorTl.... Slandarc(' ,. En.d ~ec _ ~~c . Covered by WAC 296-127-018 44 Guardrail components . - . 45 Aggregates/Concrete mixes 46 Asphalt Covered by WAC 296-127-018 47 Fiber fabrics x - ~ -- - - -- - - - - - - - - --- - - 48 Electncal wiring/components -- -- - -- - - - - --- ~--- 49 treated or untreated timber pile X - - --- -- - - ---- X ~-- ~- --- ------- - - - -- -- -- - ~-- -- --- ----- - --- ----- 50 Girder pads (elastomenc bearing) X _nn_______ _________ _ ____ ___ 51 Standard Dimension lumber X -- - -- --- - ----- - ---- - -- --- -------- -- ------ ------- - X 52 Irrigation components Supplemental to Wage Rates 7 WSDOT's Predetermined List for Suppliers - Manufactures - Fabricator ITEM DESCRIPTION YES NO 53 Fencing matenals 54. GUide Posts 55 Traffic Buttons 56 Epoxy x x -- - --- ~-~ X ----- ----~- X --- - ---------------- ~-- -- - ---- - --- ~--- ----- -- 57 Cribbing - --- -- -- 58 Water distnbutlon matenals ----- 59 Steel "Hit piles - --- --- - - -- -- ------ --- -- - - - -- -- - -- 60. Steel pipe for concrete pile casings -- - 61 Steel pile tipS, standard _ ___ __ ___ ___n _ _ __ 62. Steel pile tipS, custom Supplemental to Wage Rates I I I --i _ _1 , X X. X x X -- - - --- X 8 State of Washington Department of Labor and Industries Prevailing Wage Section - Telephone (360) 902- PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here Include both the hourly wage rate and the hourly rate of fringe benefits On public works proJects, workers' wage and benefit rates must add to not less than thiS total A brief description of overtime calculation requirements IS proVided on the Benefit Code Key METAL FABRICATION (IN SHOP) EFFECTIVE 08-31-2008 (See Benefit Code Key) **************************************************************************************************** ClaSSification Code Prevailing Wage Overtime Code Holiday Code Counties Covered ADAMS, ASOTIN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, KITTITAS LINCOLN, OKANOGAN, PEND ORIELLE, STEVENS, WALLA WALLA AND WHITMAN FITTER/WELDER LABORER MACHINE OPERATOR PAINTER $1276 $813 $1266 $1020 Counties Covered BENTON MACHINE OPERATOR PAINTER WELDER $1053 $976 $1670 Counties Covered CHELAN FITTER LABORER MACHINE OPERATOR PAINTER WELDER $1504 $954 $971 $993 $1224 1 1 1 1 Counties Covered CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, LEWIS, MASON, PACIFIC SAN JUAN AND SKAGIT FITTER/WELDER LABORER MACHINE OPERATOR PAINTER $1516 $1113 $1066 $1141 Supplemental to Wage Rates 1 1 1 1 9 METAL FABRICATION (IN SHOP) EFFECTIVE 08-31-2008 **************************************************************************************************** Classification Code FITTER LABORER MACHINE OPERATOR PAINTER WELDER LA YEROUT MACHINE OPERATOR PAINTER WELDER FITTER/WELDER PAINTER FITTER LABORER MACHINE OPERATOR PAINTER WELDER FITTER LABORER MACHINE OPERATOR WELDER Supplemental to Wage Rates (See Benefit Code Key) Prevailing Wage Counties Covered CLARK $28 63 $20 35 $2991 $26 45 $28 03 $29 91 Counties Covered COWLITZ $24 46 $24 46 $24 46 Counties Covered GRANT $1079 $807 Counties Covered KING $1586 $978 $1304 $11 10 1548 Counties Covered KITSAP $26 96 $807 $1383 $1383 OvertiMe Code 1E 1E 1E 1E 1E 1E 1B 1B 1B Holiday Code 6H 6H 6H 6H 6H 6H 6V 6V 6V 10 METAL FABRICATION (IN SHOP) EFFECTIVE 08-31-2008 **************************************************************************************************** ClaSSification Code FITTER/WELDER LABORER MACHINE OPERATOR PAINTER FITTER LABORER MACHINE OPERATOR WELDER FITTER/WELDER LABORER MACHINE OPERATOR PAINTER FITTER LABORER MACHINE OPERATOR PAINTER WELDER Supplemental to Wage Rates (See Benefit Code Key) Prevailing Wage Counties Covered KLlCKITAT, SKAMANIA, WAHKIAKUM $1699 $1044 $1721 $17 03 Counties Covered PIERCE $1525 $1032 $13 98 $1398 Counties Covered SNOHOMISH $1538 $979 $884 $998 Counties Covered SPOKANE $1259 $807 $1326 $1027 $1080 Overtime Code 1 1 1 1 1 Holiday Code 11 METAL FABRICATION (IN SHOP) EFFECTIVE 08-31-2008 **************************************************************************************************** ClaSSification Code FITTER LABORER MACHINE OPERATOR LAYEROUT WELDER FITTER/WELDER LABORER MACHINE OPERATOR FITTER LABORER MACHINE OPERATOR PAINTER WELDER Supplemental to Wage Rates (See Benefit Code Key) Prevailing Wage Counties Covered THURSTON $24 88 $1661 $26 95 $26 95 $22 81 Counties Covered- WHA TeaM $1381 $900 $1381 Counties Covered YAKIMA $1200 $1031 $11 32 $1200 $11 32 Overtime Code 1A 1A 1A 1A 1A Holiday Code 6T 6T 6T 6T 6T 12 FABRICATED PRECAST CONCRETE PRODUCTS EFFECTIVE 08-31-2008 ***************************************************************************************~~*********~ (See Benefit Code Key) ClaSSification Code Prevailing Wage Overtime Code Holiday Code Counties Covered ADAMS, ASOTIN, BENTON, COLUMBIA, DOUGLAS, FERRY, GARFIELD, GRANT, LINCOLN, OKANOGAN, PEND OREILLE, STEVENS, WALLA WALLA AND WHITMAN ALL CLASSIFICATIONS $996 ALL CLASSIFICATIONS Counties Covered CHELAN, KITTITAS, KLlCKITAT AND SKAMANIA 861 Counties Covered CLALLAM, CLARK, COWLITZ, GRAYS HARBOR, ISLAND, JEFFERSON, KITSAP,LEWIS, MASON, PACIFIC, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WAHKIAKUM ALL CLASSIFICATIONS $1350 Counties Covered FRANKLI\\J ALL CLASSIFICATIONS $11 50 Counties Covered KING ALL CLASSIFICATIONS $1315 2K 5B Counties Covered PIERCE ALL CLASSIFICATIONS $928 Counties Covered SPOKANE ALL CLASSIFICATIONS $20 23 Counties Covered WHA TCOM ALL CLASSIFICATIONS $1367 Counties Covered YAKIMA CRAFTSMAN LABORER $872 $807 1 1 Supplemental to Wage Rates 13 WSDOT's List of State Occupations not applicable to Heavy and Highway Construction Projects This project IS subject to the state hourly minimum rates for wages and fringe benefits In the contract provIsions, as provided by the state Department of Labor and Industries. The following list of occupations, IS comprised of those occupations that are not normally used In the construction of heavy and highway projects When considering job classifications for use and / or payment when bidding on, or building heavy and highway construction projects for, or administered by WSDOT, these Occupations will be excepted from the Included "Washington State Prevailing Wage Rates For Public Work Contracts" documents . Electrical Fixture Maintenance Workers . Electricians - Motor Shop . Heating Equipment Mechanics o Industrial Engine and Machine Mechanics . Industrial Power Vacuum Cleaners . Inspection, Cleaning, Sealing of Water Systems by Remote Control . Laborers - Underground Sewer & Water . Machinists (Hydroelectric Site Work) . Modular BUildings . Playground & Park FqUlpment Installers . Power Equipment Operators - Underground Sewer & Water . ReSidential *** ALL ASSOCIATED RATES *** . Sign Makers and Installers (Non-Electrical) . Sign Makers and Installers (Electncal) . Stage Rigging Mechanics (Non Structural) The followmg occupations may be used only as outlined in the preceding text concernmg "WSDOT's list for Suppliers - Manufacturers - Fabricators" . Fabricated Precast Concrete Products . Metal Fabrication (In Shop) Definitions for the Scope of Work for prevailing wages may be found at the Washington State Department of Labor and Industries web site and in WAC Chapter 296-127 Supplemental to Wage Rates 14 Washington State Department of Labor and Industries Policy Statements (Regarding Production and Delivery of Gravel, Concrete, Asphalt, etc.) The following two letters from the State Department of Labor and Industries (State L&I) dated August 18, 1992 and June 18, 1999, clarify the Intent and establish policy for administrating the prOVisions of WAC 296-127-018 COVERAGE AND EXEMPTIONS OF WORKERS INVOLVED IN THE PRODUCTION AND DELIVERY OF GRAVEL, CONCRETE, ASPHALT, OR SIMILAR MATERiALS. Any firm With questions regarding the policy, these letters, or for determinations of covered and non-covered workers shall be directed to State L&I at (360) 902-5330 c; EffectIve September 1, 1993, minimum prevailing wages for all work covered by WAC 296-127-018 for the production and/or delivery of materials to a publiC works contract will be found under the regular classification of work for Teamsters, Power Equipment Operators, etc. - -.- -- Supplemental to Wage Rates 15 ESAC DIVISION - TELEPHONE (206) 586-6887 PO BOX 44540, OLYMPIA, WASHINGTON 98504-4540 August 18, 1992 TO' FROM All Interested Parties SUBJECT Jim P Christensen Acting Industnal Statistician Materials Suppliers - WAC 296-127-018 This memo IS Intended to provide greater clanty regarding the application of ~AC296- 127-018 to awarding agencies, contractors, subcontractors, matenal suppliers and other Interested parties The Information contaIned herein should not be construed to cover all possible scenanos which might require the payment of prevailing wage The absence .of a particular activity under the heading "PREVAILING WAGES ARE REQUIRED.FOR" does not mean that the activity is not covered. Separate Material Supplier Equipment Operator rates have been eliminated. For those cases where a production facility is set up for the specific purpose of supplying matenals to a public: works construction site, prevailing wage rates for operators of .equipment such as crushers and batch plants can be found under Power Equipment Operators. PREVAILING WAGES ARE REQUIRED FOR: Hauling materials away from a public works project Site, including excavated matenals, demolished materials, etc. 2 Delivery of materials to a public works project site using a method that involves incorporation of the delivered materials into the project Site, such as spreading, leveling, rolling, etc. 3 The production of materials at a faCIlity that is established for the specific, but not necessanly exclusive, purpose of supplying matenals for a public works project 4. Delivery of the materrals mentioned in #3 above, regardless of the metl10d of delivery. PREVAILING WAGES ARE NOT REQUIRED FOR: 1 The production of materials by employees of an established matenals supplier, in a permanent faCIlity, as well as the delivery of these matenals, as long as df:llvery does not Include incorporation of the materials Into the job site 2. Delivery of materials by a common or contract carner, as long 0;:; delivery does not include Incorporation of the materrals into the job site 3 Production of materials for unspecified future use Supplemental to Wage Rates 16 STA TE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES June 18, 1999 TO Kerry S Radcliff, Editor Washington State Register FROM Gary Moore, Director Department of Labor and Industnes SUBJECT Notice re WAC 296-127-018, COh~rage and exemptions of wor~ers involved in the production and delivery of grav(,!l, concn':!te, asphf;.llt, or similar materials ~::: -:- The department wishes to publish the following Notice in the next edition of the_,_ ' _ Washington State Register ~ .------ ~-- =--=:-:=-- NOTICE Under the current material supplier regulations, WAC 296-127-018, thc'" department takes the position that prevailing wages do not apply to'the delivery of wet concrete to public works sites, unless the dnvers do something more than Just deliver the concrete Dnvers delivering concrete into a crane and bucket, hopper of a r)ump trut,k, or fOi'rns (II _. footings, are not entitled to prevailing wages unless ttley operate machinery or use tools that screed, float, or put a finish on the concrete This position applies only to the delivery of wet concrete It does not extend to the delivery of asphalt, sand, gravel, crushed rock, or other __, similar materials covered under WAC 296-127-018. The department's' position applies only to this regulation. If you need additional Information regarding this matter, please cont8ct Greg Mowat, Program Manager, Employment Standards, at P.O. Box 44510, Olympia, WA 98504-4510, or ~all (360) 902-5310. Please publish the above Notice in WSR 99-13. If you have questions or need additional Information, please call Selwyn Walters at 902-4206 Thank you. Cc Selwyn Walters, Rules Coordinator Patrick Woods, ASSistant Director Greg Mowat, Program Manager Supplemental to Wage Rates 17 BENEFIT CODE KEY - EFFECTIVE 08-31-08 *~******~~**********~*****~***************~*********~******4**~*~**~~~~*********************************~**~***~******** OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON TilE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MII'IUS THE HOURLY RATE OFTHE COST OF FRINGE BE1\lEFITS ACTUALLY PROVIDED FOR THE WORKER. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE A ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLlDA YS SHALL ALSO BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B !\LL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF W AGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE C THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (IO) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER OVERTIME HOURS WORKED SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE D THE FIRST TWO (2) HOURS BEFORE OR !\FTER A FIVE - EIGHT (8) HOUR WORKWEEK DAY OR A FOUR - TEN (10) HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTER EITHER WORKWEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL ADDITIONAL-HOURS WORKED AND ALL WORKED ON SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE E THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIME~ THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON~- SUNDAYS AND- HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE F THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (IO) HOURS.ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOiJRLY RATE~OF WAGE ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL Ee: PAID AT DOUBLE THE l-iOURLY RATE OF W AGE ALL HOURS WORKED ON LABOR DAY SHALL BE F AID AT THREE TIMES THE HOURL Y RATE OF VI AGE ~ G THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEl.T (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, :;HALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE _ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER. DAY MONDAY ,THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE H ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID ATONE AND Ol,TE-HALF TIMES THE HOURL Y~ RA TE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (I2) HOURS AND ALL HOURS WORKED ON SUNDA YS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN (IO) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE K ALL HOURS WORKED ON SA TURDA YS AND SUNDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE L ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL YRA TE OF WAGE M ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE N ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RA TE OF WAGE o THE FIRST TEN (10) HOURS WORKED ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS, HOLIDAYS AND AFTER TWELVE (12) HOURS, MONDAY THROUGH FRIDA Y, AND AFTER TEN (10) HOURS ON SA TURDA Y SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE P ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF CIRCUMSTANCES WARRANT) AND SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE BENEFIT CODE KEY c EFFECTIVE 08-31-08 -2- I ' Q THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND UP TO TEN (10) HOURS WORKED ON '3A TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SA TURDA Y AND ALL HOUR~ WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRIST MAS DAY) SH "LL BE PAID AT DOUBLE THE HOURLY RA TE OF WAGE ALL HOURS WORKED ON CHRISTMAS DA Y SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE R ALL HOURS WORKED ON SUNDA YS AND HOLlDA YS SHALL BE PAID AT fWO TIMES THE HOURLY RATE OF WAGE S THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDA Y AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DA Y, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DA Y SHALL BE PAID AT THREE TIMES THE HOURL Y RATE OF WAGE T WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DA Y, OR TEN (10) HOURS OF STRAIGHT TIME PER DAY WHEN FOUR TEN (10) HOUR SHIFTS ARE ESTABLISHED, OR fORTY (40) HOURS OF STRAIGHT TIME PER WEEK, MONDAY THROUGH FRIDAY, OR OUTSIDE THE NORMAL SHIFT AND ALL WORK ON SA TURDA YS SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME. RATE HOU;~S WORKED OVER rWELVE HOURS (12) IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SA TURDA Y TO 6 00 AM MONDAY AND HOLIDAYS SHALL BE PAID AT DOUBLE THE STRAIGHf TIME RATE OF PAY fHE EMPLOYER SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES PRIMARY CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE WORK TO BE PERFORMED ON OVERTIME SITUATIONS AFTER AN EMPLOYEE HAS WORKED EIGHT (8) HOURS AT AN APPLICABLE OVERTIME'RATE, ALL ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS HAD A BREAK OF EIGHT (8) HOURS OR MORE U ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF rIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE V ALL HOURS WOR\5-ED ON SA TURDA YS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY "NO CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DA Y SHALL BE PAID AT DOUBLE THE l{OURL Y RATE OF WAGE W ALL HOURS WORKED ON SA TURDA YS AND SUNDA YS (EXCEPT MAKE-UP DA YS DUE TO CONDITIONS BEYOND THE CONTROL OF THE EMPLOYER)) SHALL Bl:. PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON HOLlDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE X THE FIRST FOUR (4) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TWEL VE (12) HOURS ON SA TURDA Y SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RA Tt OF WAGE ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SA TURDA y, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE WHEN HOLIDAy FALLS ON SATURDAY OR SUNDAY, THE DAY BEFORE SA TURDA Y, FRIDAY, AND THE DAY AFTER SUNDAY, MONDAY, SHALL BE CONSIDERED THE HOLIDA Y AND ALL WORK PERFORMED SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE Y ALL HOURS WORKED OUTSIDE THE HOURS OF 5 00 AM AND 5 00 PM (OR SUCH OTHER HOURS AS MAYBE AGREED UPON BY ANY EMPLOYER AND THE EMPLOYEE) AND ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DA Y (10 HOURS PER DAY FOR A 4 X 10 WORKWEEK) AND ON SATURDAYS AND HOLIDA YS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE (EXCEPT FOR EMPLOYEES WHO ARE ABSENT FROM WORK WITHOUT PRIOR APROVAL ON A SCHEDULED WORKDAY DURING THE-WORKWEEK SHALL BE PAID AT THE STRAIGHT-TIME RATE UNTIL THEY HAVE WORKED 8 HOLJRS IN A DAY (10 IN ^ 4 X 10 WORKWEEK) OR 40 HOURS DURING THAT WORK WEEK) ALL HOURS WORKED MONDAY THROUGH SA TURDA Y OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND LABOR DAY SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE - 2 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE A THE FIRST SIX (6) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON SUNDA YS AND HOLlDA YS SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE B ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE C ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON HOLlDA YS SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE o ALL HOURS WORKED ON SA TURDA YS AND SUNDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RA TE OF WAGE THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN 2 BENEFIT CODE KEY - EFFECTIVE 08-31-08 -3- ADDITION TO THE HOLIDAY PA Y ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE E ALL HOURS WORKED ON SA TURDA YS OR HOLIDAYS (EXCEPT LABOR DA Y) ~HALL BE PAID ATONE AND ONE- HALF TIMES THE HOURLY RATE Of. WAGE ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RA TE OF WAGE F TIlE FIRST l::IGHT (8) HOURS WORKED ON HOLlDA YS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDITION TO THE HOLlDA Y PA Y ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLlDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE G ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON PAID HGLlDA YS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PA Y H ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIME') THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SA TURDA YS AND HOLIDAY,) (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND ON LABOR DA Y SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE K ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, INCLUDING mE HOLIDAY PAY ALL HOURS WORKED O;-..r UNPAID HOLIDAYS SHALL BE PAID-AT lWO TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON HOLIDA YS SHALL BE FAID AT TWO TIMES THE HOURL Y RATE OF WAGE IN ADDITION TO THE HOLlDA Y PA Y M ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE I-IOURL Y RATE OF WAGE o ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALFTIMES THE HOURLY RATE Of WAGE ~ P THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF W AGE ALL HOURS WORKED IN EXCESS OF EIGHT 8) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON SUNDA YS AND HOLlDA YS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE Q ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE - 4A ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) l-iOtJkS PER WEEK SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE 5 flOLIDA Y CODES A HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DA Y AND CHRISTMAS DAY (7) - .B HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DA Y, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8) C HOLIDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, THE FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (8) o HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDA Y AND SA TURDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) E HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, PRESIDENTIAL ELECTION DA Y, THANKSGIVING DA Y, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DA Y (8) F HOLIDA YS NE\V YEAR'S DAY, MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DA Y, AND CHRISTMAS DAY (II) G HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DA Y (7) N - P Q R .' S T 6 - BENEFIT CODE KEY - EFFECTIVE 08-31-08 -4- H HOLlDA YS NEW YEAR'S DAY. MEMORIAL DAY, INDEPENDENCE DAY THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DA Y, AND CHRISTMAS (6) HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (6) l-IOLlDA YS NEW YEAR'S DAY MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DA Y, AND CHRISTMAS DA Y (7) K HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DA Y, THE DAY BEFORE CHRISTMAS AND CHRISTMAS DAY (9) L HOLIDA YS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DAY (8) M HOLlDA YS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DA Y. FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS AND CHRISTMAS DAY (9) HOLlDA YS NEW YEAR'S DA Y, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, VETERANS' DA Y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (9) HOLlDA YS NEW YEAR'S DA Y, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, FRlDA Y AND SA TURDA Y AFTER THANKSGIVING DAY, THE DAY BEFORE CHRIST~tlAS, AND CHRISTMAS DAY (9)- PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY. AND CHRISTMAS DAY (6) PAID HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DA Y AFTER THANKSGIVING DAY, ONE-HALF DA Y BEFORE CHRISTMAS DAY, AND CHRISTMAS DA Y (7 II2) PAID HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y THANKSGIVING DAY, AND CHRISTMAS DAY (7) PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY BEFORE OR AFTER CHRISTMAS (IO) U PAID HOLIDAYS NEW YEAR'S DAY. MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, AND CHRISTMAS DAY (8) - V PAID HOLlDA YS SIX (6) PAID HOLIDAYS W PAID HOLlDA YS NINE (9) PAID HOLlOA YS X HOLlDA YS AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY AFTER 2080 HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DA Y AND A FLOATING HOLIDAY (8) Y HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DA Y, THANKSGIVING DAY, THE FRIDA Y FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8) Z HOLlDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VE1ERANS DAY, THANKSGIVING DA Y, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) A PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (8) B PAID HOLlDA YS NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE'S DAY, AND CHRISTMAS DAY (9) C HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DA Y AFTER THANKSGIVING DAY, THE LAST WORK DA Y BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9) D PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY. THE DAY BEFORE OR THE DAY AFTER CHRISTMAS DAY (9) BENEFIT CODE KEY - EFFECTIVE 08-31-08 -5- E PAID HOLIDAyS NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRE<;IDENTS DAY, MEMORIAL DA Y, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DA Y. AND A HALF-DAY ON CHRISTMAS EVE DAY (9 1/2) F PAID HOLIDAYS NEW YEAR'S DAY. MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DA Y, THANK:,GIVING DA Y. THE DA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (I I) G PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY. LABOR DAY, VETERANS' DAY, THANKSGIVING DAY THE FRIDAY AFTER THANKSGIVING DA Y, CHRISTMAS DAY, AND CHRISTMAS EVE DAY (Ii) H PAID HOLIDA YS NEW YEAR'S DAy, NEW YEAR'S EVE DAY, MEMORIAL DAY, INDEPENDENCE DAY. LABOR DA Y, THANKSGIVING DA Y, FRIDA Y AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A FLOATING HOLIDA Y (I 0) . PAID HOLIDA YS NEW YEAR'S DA Y, MEMORIAL DA Y, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, FRIDA Y AFTER THANKSGIVING DA Y. AND CHRISTMAS DAY (7) PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y. THA.NKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A FLOA TING HOLlDA Y (9) L HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y. LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DA Y (8) Q PAID HOLlDA YS NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DA Y. LABOR DAY. VETERANS DA Y, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY (8) UNPAID hOLIDAY, PRESIDENTS' DA Y T PAID HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, ,NDEPDJDENCE DAY, LABOR DA Y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, THE LAST WC~,KING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9) U HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, :~,.rDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BHORE CHRISTMAS DAY, CHRISTMAS DAY (9) V PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE (9) W PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENfS DAy, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DA Y, CHIZISTMAS DA Y, DA Y BEFORE OR AFTER CHRISTMAS DAY (10) X PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY OA Y AFTER THANKSGIVING DA Y, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (I I) NOTE CODES 8 A THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN f..DDITION TO THE HOURL Y WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPL Y TO DEPTHS OF FIFTY FEET OR MORE OVER 50' TO 100' - $100 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 175' - $2 25 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 175' TO 250' - $5 50 PER FOOT FOR EACH FOOT OVER 175 FEET OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO LESS THAN THE SCALE LISTED FOR 250 FEET C THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN ADDITION TO THE HOURL Y WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPL Y TO DEPTHS OF FIFTY FEET OR MORE OVER 50' TO 100' - $100 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 150' - $ I 50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150' TO 200' - $2 00 PER FOOT FOR EACH FOOT OVER 150 FEET BENEFIT CODE KEY - EFFECTIVE 08-31-08 -6- OVER 200' - DIVERS MA Y NAME THEIR OWN PRICE D WORKERS WORKING WITH SUPPLIED AIR ON HAZMA T PROJECTS RECEIVE AN ADDITIONAL 'j; 1 00 PER HOUR L WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A $075, LEVEL B $0 50, AND LEVEL C $025 M WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURL Y PREMIUM~ AS FOLLOWS LEVELS A & B $ I 00 LEVELS C & D $0 50 N -- WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS fOLLOWS - LEVEL A $ I 00 LEVEL B $075, LEVEL C $050, AND LEVEL D $025 State of Washington DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage Rates For Public WOiks Contracts The PREVAILING WAGES listed here Include both the hourly wage rate and the hourly rate of fnnge benefits On public works projects, workers' wage and benefit rates must add to not less than thiS total A brief descnptlon of overtime calculation requirements IS provided on the Benefit Code Key CLALLAM COUNTY EFFECTIVE 08-31-2008 ***********************************************************************************~********************** ClaSSification ASBESTOS ABATE:MENT WORKERS JOURNEY LEva BOILERMAKERS ,JOURNEY LEVEL BRICK AND MARALE MASONS JOURNEY LEVEL CABINET MAKERS (IN SHOP) JOURNEY LEVEL CARPENTERS ACOUSTICAL WORKE'R BRIDGE, DOCK AND WARF CARPENTERS C:ARPENTER CREOSOTED MA TERI/\L DRYWALL APPLlCA10R FLOOR FINISHER FLOOR LAYER FLOOR SANDER MILLWRIGHT AND MACHINE ERECTORS PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDIt'-JG SAWFILER SHINGl ER STATIONARY POWER SAW OPERATOR STATIONARY WOODWORKING TOOLS CEMENT MASONS JOURNEY LEVEL DIVERS & TENDERS DIVER DIVER TENDER DREDGE WORKERS ASSISTANT ENGINEER ASSISTANT MATE (DECKHAND) BOATMEN ENGINEER WELDER LEVERMAN, HYDRAULIC MAINTENANCE MATES OILER DRYWALL TAPERS JOURNEY LEVEL ELECTRICAL FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL Page 1 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE CodE: Code Code $38 06 1H 5D' $50 33 1C 5N' $45 05 1M 5A , " $1467 $46 32 1M ' 50 $4616 1M bD $46 16 1M ' 5D $4fl ::'5 1M 'SO $46 47 1M 50 $46 16 1M 50 $46 16 1M 50 $46 16 1M sD $47 16 1M "50 $46 36 1M t.0 $46 16 1 r\~ 50' $46 16 1M 50 $46 16 1M ,50 $46 16 1M 50 ' $38 06 1H 50 $92 31 1M ,50 8A $49 84 1M 50 $4709 1T 5D 8L $46 58 1T 50 8L $47 09 1T 50 8L $47 14 1T 50 8L $48 71 1T 50 8L $46 58 1T 50 8L $47 09 1T 50 8L $46 71 1T 50 8L $46 04 1E 5P $937 CLALLAM COUNTY EFFECTIVE 08-31-2008 ********************************************************************************************************** ClaSSification PREVAILING WAGE ELECTRICIANS - INSIDE CABLE SPLICER CABLE SPLICER (TUNNEL) CERTIFIED WELDER CERTIFIED WELDER (TUNNEL) CONSTRUCTION STOCK PERSON JOURNEY LEVEL JOURNEY LEVEL (TUNNEL) ELECTRICIANS - MOTOR SHOP CRAFTSMAN JOURNEY LEVEL ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER CERTIFIED LINE WELDER GROUNDPERSON PlEAD GROUNDPERSON HE.AVY LINE EQUIPMENT OPERATOR JACKHAMMER OPERATOR JOURNEY LEVEL -L1NEPERSON LINE EQUiPMENT OPERATOR POLE SPRAYER POWDERPERSON ELECTRONIC 1 ECHNICIA!\~S . E:LE.C mONIC TECHNICIANS JOURNEY LEVEL ELEVATOR CONSTRUCTORS MECHANIC MECHANIC IN CHARGE FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS FENCE ERECTORS FENCE ERECTOR FENCE LABORER I:LAGGERS JOURNEY LEVEL GLAZIERS ,JOURNEY LEVEL HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC HEATING EQUIPMENT MECHANICS MECHANIC HOD CARRIERS & MASON TENDERS JOURNEY LEVEL INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL INLAND BOATMEN CAPTAIN COOK DECKHAND ENGINEER/DECKHAND MATE, LAUNCH OPERATOR $58 34 $62 86 $56 29 $60 60 $28 83 $54 25 $58 34 $1537 $14 69 $56 53 $51 64 $37 15 $39 19 $51 64 $39 19 $51 64 $43 83 $51 G4 $39 19 $1207 $60 85 $66 25 $13 50 $13 80 $11 bO $32 41 $45 20 $47 58 $16 00 $39 25 1H 50 $15 65 $924 $59 22 $3481 $34 52 $58 62 $50 20 Page 2 CLALLAM COUNTY EFFECTIVE 08-31-2008 ***************************************************************k*******************************~********** ,Cl3sslflcallon INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR GROUT TRUCK OPERATOR HEAD OPERATOR TECHNICIAN TV TRUCK OPERATOR INSULATION APPLICATORS JOURNEY LEVEL IRONWORKERS JOURNEY LEVEL LABORERS ASPHALT RAKER BALLAST REGULATOR MACHINE BATCH WEIGHMAN BRUSH CUTTER BRUSH HOG FEEDER BURNERS CARPENTER TENDER CASSION WORKER CEMENT DUMPER/PAVING CEMENT FINISHER TENDER CHANGE-HOUSE MAN OR DRY SHACKMAN CHIPPING GUN (OVER 30 LBS) CHIPPING GUNiUNDER 30 LBS) CHOKER SETTER CHUCK TENDER CLEAN-UP LABORER CONCRETE DUMPER/CHUTE OPERATOR CONCRETE FORM STRIPPER CONCRETE SAW OPERATOR CRUSHER FEEDER CURING LABORER. DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS) DITCH DIGGER DIVER DRILL OPERATOR (HYDRAULIC, DIP-MONO) DRILL OPERATOR, AIRTRAC OUMPMAN EPOXY TECHNICIAN EROSION CONTROL WORKER FALLER/BUCKER, CHAIN SAW FINAL DETAIL CLEANUP (I e , dusting, vacuuming, Window cleaning NOT construction debriS cleanup) FINE GRADERS FIRE WATCH FORM SETTER GABION BASKET BUILDER GENERAL LABORER GRADE CHECKER & TRANSIT PERSON GRINDERS GROUT MACHINE TENDER Page 3 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code' Code $973 1 - $11 48 1 $1278 1- $807 1 $1053 . 1 $20 50 ' 1 $50 77 1.0 SA .- $38 77 lH 50 $38 06 .1H 50 $32 41 c 1H 50 $38 06 - 1H ::;0 $38 06 1H tlD, $38 06 1J:i. 50--- $38 06 1H. - 50 - $39 25 i "I 50< _ $38 77 1H .50-, $38 06 -_1H ::i0 $38 06 1H 5D $38 77 1H Sf)' $38 06 .1H ,',5D $38 06 11-1 50 $38 06 1H 5D $38 06 1H 50 $38 77 11-t [,0 $38 06 -1H 50 $38 77 1H 50 - $32 41 1H 50 $38 06 1H 50 $38 06 !H 50 $38 06 1H 5D $39 25 1H 5D $38 77- 1H bD - $39 25 1H 5D $38 06 1H 5D $38 06 1H 50 $38- 06 1H 50 $38 77 1H 50 $29 59 1H 50 $38 06 1H 50 $32 41 1H 50 $38 06 1H 50 $38 06 1H 50 $38 06 1H 50 $38 77 1H 50 $38 06 1H 50 $38 06 1H 5D CLALLAM COUNTY EFFECTIVE 08-31-2008 ********************************************************************************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note Qasslflcatlon WAGE Cod~ Code Code GUARDRAIL ERECTOR $38 06 1H 50 HAZARDOUS WASTE WORKER LEVEL A $39 25 1H 50 HAZARDOUS WASTE WORKER LEVEL B $38 77 1H 50 HAZARDOUS WASTE WORKER LEVEL C $38 06 1H 50 HIGH SCALER $39 25 1H 50 HOD CARRIER/MORTARMAN $'3877 1H 50 JACKHAMMER $38 77 1H 50 LASER BEAM OPERATOR $38 77 1H 50 MANHOLE BUILDER-MUDMAN $38 77 1H 50 MATERIAL YARDMAN $38 06 1H 50 -- MINER $39 25 -1H 50 NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USII'IlG HIGH $38 77 1H 50 PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER $38 77 1H 50 PILOT CAR $32 41 1H 50 PIPE POT TENDER $38 77 1H 50 PIPE RELINER (NOT INSERT TYPE) $38 77 1H 50 PIPELAYER & CAULKER $38 77 1H 5D PIPELA YER & CAULKER (LEAD) $39 L5 11-1 50 PIPEWRAPPER $38 77 1H 50 POT TENDER $38 06 1H 51) POWDER MAN $39 25 1H 50 POWDERMAN HELPER $3b U6 1H 50 POWERJACKS $38 T1 1H ,,50 ' RAILROAD SPIKE PULLER (POWER) $38 77 1H -50 RE~TIMBERMAN $39 25 1H 50 RIPRAP MAN $38 06 1H 50 RODDER $38 77 1H 50 SCAFFOLD ERECTOR $38 06 1H 50 SCALE PERSON $38 06 1H 50 SIGNALMAN $38 06 1H 50 SLOPER (OVER 20") $38 77 IH 50 SLOPER SPRAYMAN $38 06 1H 50 SPREADER (CLARY POWER OR SIMILARTYPES) $38 77 1H 50 SPREADER (CONCRETE) $38 77 1H 50 STAKE HOPPER $38 06 1H 50_ STOCKPILER $38 06 1H 50 TAMPER & SIMILAR ELECTRIC, AIR & GAS $38 7-7 1H 50 TAMPER (MULTIPLE & SELF PROPELLED) $38 77 1 t I 5D TOOLROOM MAN (AT JOB SITE) $38 06 1H 50 TOPPER-TAILER $38 06 1H 50 TRACK LABORER $38 06 1H 50 TRACK LINER (POWER) $38 77 1H 50 TRUCK SPOTTER $38 06 1H 50 TUGGER OPERATOR $38 77 1H 50 VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $38 06 1H 50 VIBRATOR $38 77 1H 50 VINYL SEAMER $38 06 1H 50 WELDER $38 06 1H 50 WELL-POINT LABORER $38 77 1H 50 Page 4 CLALLAM COUNTY EFrEc.;TIVE 08-31-2008 **~*****~**~*************************************************************************w******************** ClaSSification LABORERS - UNDERGROUND SEWER & WATER GENERAL LABORER PIPE LAYER LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS LANDSCAPING OR PLANTING LABORERS LATHERS JOURNEY LEVEL METAL FABRICATION (IN SHOP) FITTER/WELDE'R LABORER MACHINE OPERATOR PAINTER PAINTERS JOURNEY LEVEL PU\STERERS J(>URNEY LEVEL PLAY(,ROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL f'LUMBE::RS & PIPU-ITTERS ,IOURNEY LEVEL (,OWER EQUIPMENT OPERATORS ASSISTANT ENGINEEF1S BACKHOE, [,XCAVATOr~, SHOVEL (3 YO & UNDER) BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YO & UNDER 6 YO) BACKHOE, EXCAVATOR, SHOVEL (6 YO AND OVER WITH ATTACHMENTS) BACKHOES, (75 HP & UNDER) BACKHOES, ,(OVER 75 HP) BARRIER MACHINE (ZIPPER) BATCH PLANT OPERATOR, CONCRETE BELT LOADERS (ELEVATING TYPE) BOB~AT (SKID STEER) BROOMS BUMP CUTTER CABLEWAYS CHIPPER COMPRESSORS CONCRETE FI!-JISH MACHINE - LASER SCREED CONCRETE PUMPS CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT CONVEYORS CRANES, THRU 19 TONS, WITH ATTACHMENTS CRANES, 20 - 44 TONS, WITH ATTACHMENTS CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH AT ACHMENTS) CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER CRANES, A-FRAME, OVER 10 TON Page 5 PREVAILING WAGE $38 06 $38 77 $1289 $1289 $1289 $4642 $1516 $11 1:) $1 0 60 $1141 $33 94 $25 83 $8 Of $6024 $44611 ~~7 42 $47 91 $48 46 $4700 $47 42 - $47 42 $47 42 $47 00 $44 64 $44 64 $47 42 $47 91 $4742 $44 64 $44 64 $4700 $4742 $4700 $47 00 $4742 $47 91 $4B 46 $47 03 $44 64 $47 00 (See Benefit Code Key) Over Time Holiday Note Code _ Code Code 1H 50 1H 50 1 - - 1 ~ 1M - 50 - ~i - 2B 5A ',G GA 1T !iU iT 5[) 1T 50 1T 50, n- 5D '11 ' bD H 50 11 5D 1T 5D n 50 1T 50 1T 50 1T SO 1T 50 1T 50 1f 50 1T 5D 1T 50 1T 50 H 60 1T 50 IT 50 1T 50 1T 50 1T 50 1T 50 8L ; 8L 8L 8L 8L 8L' 8L 8L 8L 8L 3L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L 8L CLALLAM COUNTY EFFECTIVE 08-31-2008 ****************************************************************~***************************************** (See Benefit Code Key) Over PREVAILING Time Holiday Note ClasSification WAGE- Code Cod~ Code CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $48 29 n ,M 8L ATTACHMENTS CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $47 42 n 50 8L CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $4791 iT 50 8L CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $48 46 n 5D 8L - CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $48 46 n 50 8L CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $47 03 H_ 50 8L' CRUSHERS $4742 n 50 8L DECK ENGINEER/DECK WINCHES (POWER) $4742 1T 50 3L DERRICK, BUILDING $47 91 H_ 50 8L DOZERS, D-9 & UNDER $47 00 H 50 8L DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT M700 H 50 8L DRILLING MACHINE $47 42 n 5D 8L - ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $44 64 n 50 8L .EQUIPMENT SERVICE ENGINEER (OILER) $47 00 _:1T 5D 8L FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $47 42 n 50 8L r-GRK LIFTS, (3000 LBS AND OVER) $4700 - -- H 50 8L FORK LIFTS, (UNDER 3000 LBS) $4~ G4 iT 50 Rl GRADE ENGINEER $47 00 1T SO 8L - GRADECHECKER AND ST AKEMAN $44 64 1:1 50 8L GUARDRAIL PUNCH $47 42 1:r~: '"'C- -_50 8L ,HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $4700 -H 50 8L HORIZONTAUOIRECTIONAL DRILL LOCATOR $47 00 JL 50 8L ~--- -- HORIZONTAUOIRECTIONAI DRILL OPERATOR $47 42 1T 50 _ _ elL - 'HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $4464 iT _50 _ 8L HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $47 00 1T 50 8L LOADERS, OVERHEAD (6 YD UP TO 8 YO) $47 91 H 50 8L LOADERS, OVERHEAD (8 YO & OVER) $48 46 H- 50 8L LOADERS, OVERHEAD (UNDER 6 YO), PLANT EEEO $47 42 n ". 5D 8L LOCOMOTIVES, ALL $4742 '11- 5D at ME'CHANICS, J\LL $47 91 n -50 8L MIXERS, ASPHALT PLANT $47 42 1T 50 .8L MOTOR PATROL GRADER (FINISHING) $4742 n- 50 8L MOTOR PATROL GRADER (NON-FINISHING) $47 00 n 50 8L MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $47 91 1L 50 8L O'L DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $44 64 iT 50 SL OPERATOR PAVEOMENT BREAKER $44 64 n 50 8L PILEDRIVER (OTHER THAN CRANE MOUNT) $47 42 n 5D SL PLANT OILER (ASP HAL T, CRUSHER) $47 00 11" 51) , 8L POSTHOLE DIGGER, MECHANICAL $44 64 1T 50 8L POWER PLANT $44 64 n 50 8L PUMPS, WATER $44 64 H 5D 8L QUAD 9, D-10, AND HD-41 $47 91 n 50 8L REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $47 91 H 50 8L EQUIP RIGGER AND BELLMAN $44 64 H 50 8L ROLLAGON $47 91 H 5D 8L ROLLER, OTHER THAN PLANT ROAD MIX $44 64 n 5D 8L ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $47 00 n 5D 8L ROTO-MILL, ROTO-GRINDER $4742 n 5D 8L SAWS, CONCRETE $47 00 H 50 8L Page 6 CLALLAM COUNTY EFFECTIVE 08-31-2008 ********************************************************************************************************** ClaSSification SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT ( UNDER 45 YO) SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING OFF-ROAD EQUIPMENT (45 YO AND OVER) SCRAPERS, CONCRETE AND CARRY ALL SCREED MAN SHOTCRETE GUNITE SLlPFORM PAVERS SPREADER, TOPSIDE Of:'ERATOR - BLAW KNOX SUBGRADE TRIMMER TOWER BUCKET ELEVATORS TRACTORS, (75 HP & UNDER) JHACTORS, (OVER 75 HP) TRANSFER MATERIAL SERVICE MACHINE TRANSPORTERS, ALL TRACK OR TRUCK TYPE TRENCHING MACHINES TRUCK CRANE OILER/DRIVER (UNDER 100 TON) TRUCK CRANE OILER/DRIVER (100 TOI-J & OVER) TRUCK MOUNT PORTABLE CONVEYER . WHEEL TRACTO~S, FARMALL TYPE YO YO PAY DOZER POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) f'OWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE SPRAY PERSON TREE EQUIPMENT OPERATOR TREE TRIMMER TREE TRIMMER GROUNDPERSON RErRlGERATION & AIR CONDITiONING MECHANICS MECHANIC RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL RESIDENTIAL CARPENTERS JOURNEY LEVEL RESIDENTIAL CEMENT MASONS JOURNEY LEVEL RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL RESIDENTIAL ELECTRICIANS JOURNEY LEVEL RESIDENTIAL GLAZIERS ,JOURNEY LEVEL RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL RESIDENTIAL LABORERS JOURNEY LEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL Page 7 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code $4742 H 50 . SL $47 91 H 50 -SL $47 00 H 50 SL $47 42 1T 50 8L $44 64 1T 50 SL $47 91 .H 50 SL $4742 H 50. 8L $4742 1T 5LJ SL $4700 1T 50 SL $47 00 H 5D SL $4747 H 50 S:_ $47 42 H 50 SL - - $4791 .H 50 SL $47 00 1T 50 SL $47 00 1T 50 SL $4742 H ~D SL $47 42 H 50 SL $446Ll 1T- 50 Sl" $47 tl.? -H 50 _uSL $3761 $35 73 $36 19 $33 69 $25 43 ~.A 5A I~A SA 4A SA 4A 5A 4A .5A $27 68 $45 05 --1M SA $1785 $25 63 . 1 $1800 - -~ $27 78 $21 36 1 . $986 $1808 $1597 $14 60 CLALLAM COUNTY EFFECTIVE 08-31-2008 ~**********************k*************************************************************~******************** (See Benefit Code Key) Over PREVAILING Time Holiday Note ,ClaSSification WAGf,. kode Code Cogg RESIDENTIAL REFRIGERATION & AIR CONDITIONING MECHANICS JOURNEY LEVEL $5621 1G SA RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $33 59 1E 6L RESIDENTIAL SOFT FLOOR LAYERS JOURNEY LEVEL $1 0 88 RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $1967 ROOf-ERS JOURNEY LEVEL $38 28 1R SA USING IRRITABLE BITUMINOUS MATERIALS $41 28 IR SA SHeET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $54 07 1E 6L SHIPBUILDING & SHIP REPAIR BOIL ERMAKER $32 ~E) 1H 6W. HEAT & FROST INSULATOR $47 58 is SJ LABORER $1216 1 MACHINIS r $171G 1 SH:PFITTER $14 Be, 1 WELDER/BURNER $11l 66 1 SIGN MAKERS & INSTALLERS (ELECTRICAL) JOURNEY LEVEL $19 ?Si SIGN MAKERS & INSTALLEHS (NON.-ELECTRICAL) JOURNEY LEVEL $1215 SOFT FLOOR LAYERS JOURNEY LEVEL $37 08 18 5A SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $1031 1B 50 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVE:L . $19 61 STAGE RIGGING MECHANICS (NON STRUCTURAL) JOURNEY LEVEL $1323 SURVEYORS CHAIN PERSON $935 1 INSTRUMENT PERSON $11 40 -- 1 PAR fY CHIEF $13 40 TELECOMMUNICATION TECHNICIANS TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $323-1 1E liA TELEPHONE LINE CONSTRUCTION - OUTSIDE CA8LE SPLICER $31 46 28 5A HOLE DIGGER/GROUND PERSON $17 58 28 5A INSTALLER (REPAIRER) $30 17 28 SA JOlJRNEY LEVEL TELEPHONE L1NEPERSON $29 26 28 5A SPECIAL APPARATUS INSTALLER I $31 46 28 5A SPECIAL APPARATUS INSTALLER II $30 82 28 5A TELEPHONE EQUIPMENT OPERATOR (HEAVY) $31 46 28 SA TELEPHONE EQUIPMENT OPERATOR (LIGHT) $29 26 28 5A TELEVISION GROUND PERSON $1667 28 5A TELEVISION L1NEPERSONIINST ALLER $22 19 28 5A TELEVISION SYSTEM TECHNICIAN $26 42 2B 5A TELEVISION TECHNICIAN $23 76 28 5A TREE TRIMMER $29 26 28 5A Page 8 CLALLAM COUNTY EFFECTIVE 08-31-2008 *****************************************************************************k**************************** C!asslflcatlon PREVAILING WAGE TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL TILE, MARBLE & TERRAZZO FINISHERS FINISHER TRAFFIC CONTROL STRIPERS JOURNEY LEVEL TRUCK DRIVERS ASPHALT MIX (TO 16 YARDS) ASPHALT MIX (OVER 16 YARDS) DUMP TRUCK DUMP TRUCK & TRAILER m HER TRUCKS TRANSIT MIXER WELL DRILLERS 8. IRRIGATION PUMP INSTALLERS IRRIGATION PUMP INSTALLER OILER WELL DRILLER $4361 $37 44 $37 90 $43 45 $4.1 25 $20 23 $20 23 $44 25 $23 73 $11 60 $945 $11 60 Page 9 (See Benefit Code Key) Over Time - Code Hollaay .Gode Note Cod~ - - 1M 5A lB 5A -~ --"-- -1K 5A , ,-~- 1T 5D 8L -1.:r-- 5D 8L 1:.- t - 1T 5') 8L :-1 _. - -- - -~.-- -c r -- - 1~ .- --- ~- </.5C16L.. PROCLAMATION OF EMERGENCY WHEREAS, in the late afternoon of September 8, 2008, a 12 inch water main ruptured under Highway 101 causing damage to Highway 101 and adjoining property; and WHEREAS, the City does not have equipment able to excavate the site to the depth of the water main, necessitating contracting with Craig Barr Excavating to excavate the site; and WHEREAS, Highway 101 must remain closed until the roadbed can be repaired; and WHEREAS, Highway 101 is a vital thoroughfare through the City of Port Angeles; and WHEREAS, Lakeside Industries is the only local contractor available to make immediate repairs to the sub grade and roadbed of Highway 101; and WHEREAS, the total cost of repairs is estimated to be $125,000.00; and WHEREAS, RCW 39.04.280(1)(e) allows an exception to normal bidding requirements for public works in the event of an emergency; NOW, THEREFORE, 1. There is hereby declared in the City of Port Angeles a state of emergency due to the rupture of a 12 inch water main on Highway 101 on the afternoon of September 8, 2008. 2. There is a critical need to restore water service for drinking water and fire fighting and to restore access to Highway 101, a major arterial highway serving Port Angeles. -1- 3. Pursuant to RCW 39.04.280(1)(e), an exception to normal bidding requirements is declared for repair of the water main pipes and for repair of Highway 101 subgrade and roadbed damaged as a result of the water main rupture. 4. The Public Works and Utilities Department is authorized to contract as necessary for repair of the water main pipes, and the Highway 101 subgrade and roadbed in the area of the water main rupture in the approximate amount of$125,000.00. Dated this 9th day of September, 2008. ~ L f} ~......-' Jerald Osterman, City Manager Attest: 6~~J..AF^- Becky J. U n, ity Cle Approved as to form: iY:::l11~\tO~/4#X ~~ G ILeg.I_B.ckupIPROCLAMATIONSlProcl.m.tlOn-Emergency Front St Rep'If' 090908 wpd -2-