PROJECT MANUAL
Front St. Emergency Repairs
Project No. 30345-008
SCOPE OF WORK
The project consists of the repair of approximately 40 feet by 85 feet of roadway on
Front Street (US 101) by the placement of 6" of A TB in the shoulder area and 5" of HMA
12" asphalt overlay and installation of approximately 45 feet of curb and gutter. The
project shall include providing lighting for the placement of the ATB and HMA. The curb
and gutter shall be placed within three (3) calendar weeks of the executed contract. All
other traffic control will be provided by the City of Port Angeles.
All work to complete the project including the furnishing of all material, labor and
equipment to remove and replace all material shall be included in the bid price to do the
work.
This contract incorporates the Washington State Department of Transportation's 2008
Standard Specifications for Road, Bridge, and Municipal Construction (English Units),
referred to herein as the Standard Specifications.
See the attached Location, Site and/or detail maps for more information.
ADDITIONAL REQUIREMENTS
List all additional requirements; below is a typical list:
1. Questions may be directed to Jim Mahlum, at 360-417-4701.
2. The most recently issued Washington State Prevailing Wage Rates for Clallam
County, a copy of which is attached to this Project Manual, shall apply to this
Contract. These can be accessed on the internet at
www.lni.wa.qov/orevailinqwaae/Default.htm.
3. The Project has been declared an emergency by the City Manager, Jerry
Osterman, on September 8, 2008 and has accepted the unit bid from Lakeside
Industries as verbally submitted on September 9,2008. The accepted work is for
paving to be completed on the evening of September 9,2008 as weather
permits.
4. A retainage will be required for this work.
5. The performance period for the paving is to be completed by 8:00 AM September
10,2008 all remaining work is to be completed by September 30,2008.
BID FORM
Front St. Emergency Repairs
Project No. 30345-008
The bidder hereby bids the following amounts for all work (including labor,
equipment, time and materials) required to remove and replace asphalt
concrete pavement and related work as required in the Scope of Work.
Item Spec. Description Qty Unit Unit Price Amount
1 5-04 ATB 30 Ton $235.00 $ 7,050.00
2 5-04 HMA%" 115 Ton $265.00 $30,475.00
3 8-04 ' Cub & Gutter 1 LS $2,000.00 $ 2,000.00
Total Bid $ 39,525.00
The bidder hereby-acknowledges that it has received Addenda No(s). ~ I~
(Enter "N/A" if none were issued) to this Project Manual.
The name of the bidder submitting this bid and its business phone number and address,
to which address' all communications concerned with this bid and with the contract shall
be sent, are listed below.
Bidder's firm name, ~~~1.l,r;.~ /J~ ~
Complete address J (p?&A~ ~11~~~11 ~ 1~f:.vt1 d8,
(Street address)
~~ f111\<l1oh A IAJA qg3~6-
(CltyYA ~ (State) (Zip)
Registration No. 1 ~f.,S.:r- ~ ~, Ll'Jb
.
UBI No. (pDt l?Jfo ~l.Jl
Employment Security No. 4IScJ;);)1:P3
Industrial Ins. Acct. No. '7f)D,~d'
State Excise Tax No. ~ 0 , ~ / D fr; . <( \.I~
Telephone No. 3(00 - '-l~ -1~03
Signed by r~ ~~/
Title ~/~
Printed Name: GE()1.6~. ~
PUBLI~1>>>'ORKS
CONTRACT
This Contract is made and entered into in duplicate thIS q+'-- day of S"rtl't4.... , "
20~, by and between the City of Port Angeles, a non-charter code city of the State of
Washington, hereinafter referred to as "the City", and, l--A~.s., ~E ~fo.S'b 7~~' " a
WA.&~ \-0",- Corporation, hereinafter referred to as "the Contractor",
WITNESSETH:
Vlhereas, the City desires to have certain publIc work performed as hereinafter set' fOrth,
requiring specialized skills ancfother supportive capabilIties; and
Whereas, the Contractor represents that it is qualified and possesses s'..lfficient skills 'and
the necessary capabiliti~s to p~rform the services set forth inthis Contract.
NOW, THEREFORE, in, consideration of the' terms, conditions, and agreements
contained herein, the parties hereto agree as follows:
1. Scope of Work.
The Contractor shall do all work and fumishall tools, materials, and equipment in order
to accomplIsh the following' proj'~ct: ' ,
Front St. Emergency Repairs
Project No. 30345aOOB
m accordance with and as described in Section 1-1.3 of the Washington State Department of
Transportation Standard Specifications, and shall perform any alteratIOns in or additions t,) ,the
work provided under this Contract and every part thereof.
The Contractor shall provide and bear the expense of all eqUIpment, work, and labor of any sort '
whatsoever that may be required for the transfer of materials and for constructing and completing'
the work provided for in this Contract, except as may otherwise be provided in the Project
Manual.
2. Time for Performance and Liquidated Damages.
a. Time is of the essence in the performance of this Contract and in adhering to the
time frames specified herem. The Contractor shall commence work on Septt:mber
9, 2008 and said work shall be physically completed wIthin three (3) calendar
weeks after commencing work, unless a different time frame is expressly
provided in writing by the City.
3. Compensation and Method of Payment.
a. Tht: City shall pay the Contractor for work performed undel this Contract as
detailed in the bid, at the cO!l}p~etlOn of work and submission of a detailed
lllVOlce.
b. Payments for any alterations in or additions to the work provided under this
~ontract shall be on a negotiated time and materials basis.
, .
4. Independent Contractor RelationshlP.
It.
The relationship created by this Contract is that of independent contracting entities. No
agent, employee, servant, or representative of the Contractor shall be deemed to be an employee,
agent, servant, or representative ofthe City, and the employees of the Contractor are not entitled
to, any of the benefits the City provides for its employee!). The Contractor shall be solely and'
entirely responsible for its acts and th~ ~cts of Its agents, employees, servants, subcontractors, or
representatives during the performance of this Contract. The Contractor shall assume full
responsibility :for .payment of all wages and salarie$ and all federal, state, and local taxes or '
contributions imposed or required, incl~ding, but, not limited to, unemployment insurance,
workers compensation insurance, social security, and income tax withholding.
5. Prevailing Wage Requirements.
~- : \ ~ > I 1
The Contractor shall comply with applicable, prevailing wage requirements of the
Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and
Chapter 296-127 WAC,. The Cqntra<;tor shall document compliance with said requirements and
shall file with the City appropriate affidaVIts, certificates, and/or statements of compliance with
the State prevailing wage requirements. The Washington State Prevailing Wage Rates FoOr
Public Works Contracts, Clallam County, incorporated in thi~ Contract have been established by
the Department of Labor & Industries and are included as an Atta~hment to this Contract. The
Contractor shall also ensure that any subcontractors or' agents of the Contractor shall comply
with,tre l?rfiva~~ing wage and documentation requirements as ser forth herein.
6.
I ~ ) 'I ' , ,
Indemnification and Hold Harmless.
;\ I
, ,
a. '[ ,The Contractor shall defend, indemnify, and hold harmless the City, its officers,
officials, employees, and volunteers against and from any and all claims, injuries,
damages, losses, or suits" including attorney 'fees, arising out of or in connection
with the performance of this Contract, except for i~juries and damages caused by
the sole negligence of the City.
b. Should a court of competent jurisdiction determine that this Contract is subject to
RCW 4.24.115, then, in the event of liability for damages arising out of bodily
injury to persons or dam~g~s tD property caused by or resulting from the
concurrent negligence of the Contractor and the City, its officers, officials,
employees, and volunteers, the Contractor's liability hereunder shall be only to
the extent of the Contractor's negligence. It is further specifically and expressly
understood that the indemnification provided herein constitutes the Contractor's
waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the
purposes of this indemmfication. ThIS waiver has been mutually negotiated by
the parties. The provisions .of this section shall survive the expiration or
termination of this Contract.
7>
Insurance.
~~'\:'~?~i
The insurance coverage shall ~b~ in accordance' '\Vith and as described in the Washington
State Department of Transportation Standard Specifications DIvIsion 1-07.18.
A. VerificatlOn of Coverage
The Contractor shall furnish the City with original certificates and a copy of the
amendatory endorsements, including, hut not necessarily limited to the additional insured
endorsement, evidencing the Automobile Liability and Commercial General Liability
msurance of the Contractor before commencement of the work. Before any exposure to
loss may occur, the Contractor shall .file with the City a ,copy of the Builders Risk
insurance policy that includes all applicable conditions, exclusions, definitions, terms and
endorsements related to this proj ect.
B. Subcontractors
The Contractor shall include all subcontractors as insureds under its policies or shall
furnish separate certificates for each subcontractor. All, coverages for subcontractors
shall be subject to all of the same insurance requirements, as stated herein for the
Contractor.
8. Compliance with Laws.
a.
The Contractor shall comply with all applicable federal, state, and local laws,
including regulations for licensing, certificatio~, and operation of facilitIes and
programs, and accreditation and licensing of individuals, and any other standards ,
or criteria as set forth in the Project Manual.
",
b. The Contractor shall pay any apphcable business and permit fees and taxes which
may be required for the performance of the work.
c. The Contractor shall comply with all legal and permitting requirements as set
forth in the Proj ect Manual.
9. Non-discnmination.
Non-discrimination shall be in accordance with and as described in the Washmgton State
Department of Transportation Specifications Division 1-07.11.
10. Assignment.
a. The Contractor shall not assign thIS Contract or any interest herein, nor any
money due to or to become due hereunder, without first obtaining the written
consent of the City, nor shall the Contractor subcontract any part ofthe services to
be performed hereunder wIthout first obtaining the consent of the City.
b. The Contractor hereby assigns to the City any and all claims for overcharges
resulting from antitrust vIOlations as to goods and materials purchased in
connection with this Contract, except as to overcharges resulting from antitrust
violations commencing after the date of the bid or other event establishing the
price of this Contract. In addition, the Contractor warrants and represents that
each of its suppliers and subcontractors shall assign any and all such claims for
overcharges to the CIty in accordance with the terms of this provision. The
Contractor further agrees to give the CIty immediate notice of the existence of any.
such claim.
11. Contract Administration.
This Contract shall be administered by ;V1rJ>J <1 1JAfl/l~n behalf of the
Contractor and by James M. Mahlum, Civil Emdneer on behalf of the CIty. Any wntten
notices required by the terms of this Contract shall be served or mailed to the following
addresses:
Contractor:
~ ( ~ ~ (.L. S"'f'{l.(t:s J:i.,K:!...
~o ~ 1 d8
...pc 0 th.K:,f;L~ (..,aq q ~ ~<p ~
City:
City of Port Angeles
P.O. Box 1150
321 East Fifth Street
Port Angeles, W A 98362-0217
12. Interpretation and Venue.
This Contract shall be interpreted and construed in accordance with the laws of the State _
of Washington. The venue of any litigation between the parties regarding this Contract shall be
Clallam County, Washington.
IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed-
the day and year first set forth above. . '
CONTRACTOR:
Lakeside Industries
Name of Contractor
By:C- ~~~.
Title: m~~_
\.... /oj)
'- '
CITY OF PORT ANGELES:
,I" ,
By:
~l. O~- ~
I City Manager
Attest:
b~ JJ.rW "-
CIty er
Washington State Department of labor and Industries
Policy Statement
(Regarding the Production of "Standard" or "Non-standard" Items)
Below IS the department's (State L&l's) list of criteria to be used in determining whether a
prefabricated item IS "standard" or "non-standard" For Items not appearing on
WSDOT's predetermined list, these criteria shall be used by the Contractor (and the
Contractor's subcontractors, agents to subcontractors, suppliers, manufacturers, and
fabricators) to determine coverage under RCW 39.12 The production, In the State of
Washington, of non-standard items IS covered by RCW 39.12, and the production of
standard Items IS not. The production of any Item outside the State of Washington is not
covered by RCW 39 12.
1 Is the Item fabricated for a public works proJect? If not, It IS not subject to RCW
39 12 If it is, go to question 2.
2. Is the Item fabricated on the public works Jobsite? If It IS, the work is covered under
RCW 39 12 If not, go to question 3
3. Is the Item fabricated in an assembly/fabrication plant set up for, and dedicated
primarily to, the public works project? If It IS, the work is covered by RCW 39 12. If not,
go to question 4.
4. Does the Item require any assembly, cutting, modification or other fabrication by the
supplier? If not, the work IS not covered by RCW 39.12 If yes, go to question 5.
5. Is the prefabricated item intended for the public works project typically an inventory
item which could reasonably be sold on the general market? If not, the work is covered
by RCW 39.12. If yes, go to questIon 6.
6. Does the specIfic prefabricated Item, generally defined as standard, have any
unusual characteristics such as shape, type of material, strength requirements, finish,
etc? If yes, the work IS covered under RCW 39.12.
Any firm with questions regarding the policy, WSDOT's Predetermined LiSt, or for
determinations of covered and non-covered workers shall be directed to State L&I at
(360) 902-5330
Supplemental to Wage Rates
1
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
Below IS a list of potentially prefabncated Items, onglnally furnished by WSDOT to
Washington State Department of Labor and Industnes, that may be considered non-
standard and therefore covered by the prevailing wage law, RCW 39 12 Items marked
with an X In the "YES" column should be considered to be non-standard and therefore
covered by RCW 39 12 Items marked with an X in the "NO" column should be
considered to be standard and therefore not covered Of course, exceptions to this
general list may occur, and in that case shall be evaluated according to the cntena
descnbed in State and L&I's policy statement.
ITEM DESCRIPTION
YES
NO
Metal rectangular frames, solid metal covers, herringbone grates,
and bl-directlonal vaned grates for Catch Basin
Types 1, 1 L, 1 P, and 2 and Concrete Inlets See Std. Plans
x
2 MetaTCircular fram-es(rlngs) an-d e<:n,ers,-circular-grafes;
and prefabncated ladders for Manhole Types 1, 2, and 3,
Drywell Types 1, 2, and 3 and Catch Basin Type 2
See Std. Plans
3. Prefabrbrted steel grafe.supports an-d welded gra-fes,---- -
metal frames and dual vaned grates, and Type 1, 2, and
3 structural tubing grates for Drop Inlets See Std. Plans.
x
x
----
4
Concrete Pipe - Plain Concrete pipe and reinforced
concrete pipe Class 2 to 5 sizes smaller than 60 Inch diameter
x
_~ u_ _ _ _~_ __ _ _ __ __ ____ __ _ _ _ _____ _ _ _________ ___ _ _ __ _ ___ ~ _ _ _ _ _ _____ ___ _ __ _
5. Concrete Pipe - Plain Concrete pipe and reinforced
concrete pipe Class 2 to 5 sizes larger than 60 inch diameter
x
6 Corrugated Steel Pipe - Steel lock seam corrugated
pipe for culverts and storm sewers, sizes 30 Inch
to 120 Inches In diameter. May also be treated, 1 thru 5.
x
7. Corrugated Aluminum Pipe - Aluminum lock seam corrugated pipe
for culverts and storm sewers, sizes 30 Inch to 120 inches In
diameter. May also be treated, #5
x
Supplemental to Wage Rates
2
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
ITEM DESCRIPTION
YES
NO
8
Anchor Bolts & Nuts - Anchor Bolts and Nuts, for
mounting sign strtlctures, lumlnanes and other items, shall be
made from commercial bolt stock
See Contract Plans and Std. Plans for size and matenal type
9
-- - ----- --------- -- - ------ -- ---- ------
Aluminum Pedestnan Handrail - Pedestnan handrail
conforming to the type and material specifications set forth in the
contract plans Welding of aluminum shall be
in accordance with Section 9-28 14(3).
10
____ ____ - ____ __ - ____ __ - ___ - - _n _ _ __ ____ _ __ _ ____
Major Structural Steel Fabncation - Fabrication of major steel
Items such as trusses, beams, girders, etc , for bndges
- -- -- --- - - - -- - --- - -- - ---- -------
11. Minor Structural Steel Fabrication - Fabncatlon of minor steel
Items such as special hangers, brackets, access doors for
structures, access ladders for irrigation boxes, bridge expansion
jOint systems, etc , involving welding, cutting, punching and/or
boring of holes. See Contact Plans for item descnption and shop
drawings.
12. Aluminum Bndge Railing Type BP - Metal bndge railing
conforming to the type and material specifications set forth
in the Contract Plans. Welding of aluminum shall be in
accordance with Section 9-28.14(3)
x
_ {_ _ _ _ __ _______ L_ __
x
x
x
x
I
1j---ConcretePI~ ng--Precast-Pres-tressedcorlcrete pllTngfor- useas 55- i ----- - ___
and 70 ton concrete piling Concrete to conform to i
Section 9-19 1 of Std Spec ! X
_ ____ __________ __________ _________ _______ _ ______________ _______________ ________1.______ _____n__
14 Precast Manhole Types 1,2, and 3 with cones, adjustment : X
sections and flat top slabs. See Std. Plans
15. Precast Drywell Types 1,2, and with cones and adjustment
Sections
See Std Plans.
16. Precast Catch BaSin - Catch Basin type 1, 1 L, 1 P, and 2
With adjustment sections See Std. Plans
Supplemental to Wage Rates
X
-1- -------- ---- --- -- - <
I
X
3
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
ITEM DESCRIPTION
YES
NO
17 Precast Concrete Inlet - with adjustment sections,
See Std Plans
18
Precast Drop Inlet Type 1 and 2 with metal grate supports
See Std Plans.
x
x
x
,
- --- -----~----~------------ ------~------ --~--------~---------------~------- -~---- ---.------ ------- ---------
i
I
19
Precast Grate Inlet Type 2 with extension and top units.
See Std. Plans
x
x
,
-------------------~------------------~---------~-- ----------------------- --------
22 Vault Risers - For use with Valve Vaults and Utilities I
Vaults. X
20
Metal frames, vaned grates, and hoods for Combination
Inlets. See Std. Plans
I
I
I
____~___ _ _-1_ _ __
- ---
21
Precast Concrete Utility Vaults - Precast Concrete utility vaults of
various sizes. Used for in ground storage of utility facilities and
controls. See Contract Plans for size and construction
requirements Shop drawings are to be provided for approval
prior to casting
23
Valve Vault - For use with underground utilities
See Contract Plans for details.
Precast Co-ncrete Ba-n-Ier- - P-recast Concrete Barrier for - --
use as new barrier or may also be used as Temporary Concrete
Barrier Only new state approved barrier may be used as
permanent barrier.
24.
25
- ~-- --- -- ---- - - - - -- -- -- - - - -- -- - ----- -- - - - - -- --- ---- - - -
Reinforced Earth Wall Panels - Reinforced Earth Wall Panels in
size and shape as shown in the Plans Fabrication plant has
annual approval for methods and materials to be used.
See Shop Drawing
Fabrication at other locations may be approved, after faCilities
Inspection, contact HQ. Lab.
26
__ _____u______ ______ _ _ _ _____ __ _ ______ ________ ____
Precast Concrete Walls - Precast Concrete Walls - tilt-up wall
panel in size and shape as shown In Plans
Fabrication plant has annual approval for methods and materials
to be used
Supplemental to Wage Rates
x
x
x
x
4
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
ITEM DESCRIPTION
YES
NO
27.
Precast Railroad Crossings - Concrete Crossing Structure
Slabs
- -- - --- - -- -- - - --- ------- -------- --- - -- --- -
12, 18 and 26 Inch Standard Precast Prestressed Glrder-
Standard Precast Prestressed Girder for use.ll,l structures
Fabricator plant has annual approval of methods and materials to
be used. Shop Drawing to be proVided for approval prior to
casting girders
See Std. Spec Section 6-02 3(25)A
28
29. -Prestressed Con-crete-Girder-Series 4-f4 - Prestressed Co'ncrete-
Girders for use in structures. Fabricator plant has annual approval
of methods and materials to be used. Shop Drawing to be
provided for approval prior to casting girders.
See Std. Spec Section 6-02.3(25)A
30 Prestressed TrI-Beam Girder - Prestressed Tri-Beam Girder s for
use in structures Fabricator plant has annual approval of
methods and materials to be used. Shop Drawing to be provided
for approval prior to casting girders
See Std. Spec. Section 6-02.3(25)A
31 Prestressed Precast Hollow-Core Slab - Precast Prestressed
Hollow-core slab for use in structu'res.. Fabric~tor plant has annual
approval of methods and materials to be used Shop Drawing to
be provided for approval prior to casting girders
See Std. Spec. Section 6-02.3(25)A.
32.
Prestressed-Bulb Tee Girder - Bulb Tee Prestressed Girder for
use In structures Fabricator plant has annual approval of
methods and materials to be used. Shop Drawing to be proVided
for approval prior to casting girders.
See Std Spec Section 6-02.3(25)A
33 Monument Case and Cover
See Std. Plan
Supplemental to Wage Rates
x
x
x
x
x
x
x
5
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
ITEM DESCRIPTION
YES
NO
34 Cantilever Sign Structure - Cantilever Sign Structure
fabncated from steel tubing meeting AASHTO-M-183 See Std.
Plans, and Contract Plans for details. The steel structure
shall be galvanized after fabncation In accordance With
AASHTO-M-111
- - - --~-- - - -- -
35 Mono-tube Sign Structures - Mono-tube Sign Bridge
fabricated to details shown in the Plans Shop draWings for
approval are required pnor to fabrication
--- -- ----- ------------ ------ --- - ----
36 Steel Sign Bridges - Steel Sign Bndges fabncated from steel
tubing meeting AASHTO-M-138 for Aluminum Alloys
See Std. Plans, and Contract Plans for details. The steel
structure
shall be galvanized after fabrication In accordance
With AASHTO-M-111
37. Steel SIgn Post - Fabricated Steel Sign Posts as detailed in Std
Plans. Shop drawings for approval are to be provided pnor to
fabrication
-- ----- - -- - -- - - ---~---- - - ---- - ---- - ---
38 Light Standard-Prestressed - Spun, prestressed, hollow
concrete poles
39
Light Standards - lighting 'Standards for use' on highway
illumination systems, poles to be fabncated to conform With
methods and matenals as specified on Std Plans. See Specia
Provisions for pre-approved drawings
- ------1-
x
x
x
- ------
,
x
x
x
40-TraffTCSlg'narStanda'rds~-Traffic Sfgnal Stana'arcfs'furuse-on- '~-r-' --".-. . -.-.
highway and/or street signal systems. Standards hbe fabricated ~ X
to conform with methods and matenal as specified on Std. Plans. I
.n.____~~e ~p~~lC!LProv~~I(:>ns_f9SJ~re-aI2Qroved d rawlng~. .__________ 00_.1_ ._~,__..__
41. Precast Concrete Sloped Mountable Curb (Single and DualFaced) :
See Std Plans. !
X
Supplemental to Wage Rates 6
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
ITEM DESCRIPTION
YES
NO
42 Traffic Signs - Pnor to approval of a Fabncator of Traffic Signs,
the sources of the following matenals must be submitted and
approved for reflective sheeting, legend matenal, and aluminum
sheeting.
NOTE: *** Fabncatlon inspection required. Only signs tagged
"Fabncatlon Approved" by WSDOT Sign Fabncatlon Inspector to
be installed
x
x
Std
Custom Sl n1n
Message g 9
. .. ....____...__._. _~.es~age_
43 Cutting & bending reinforcing steel
x
--- - --...... ------- -- -- ---
X X
- .. --- CuslorTl.... Slandarc('
,. En.d ~ec _ ~~c .
Covered by
WAC 296-127-018
44 Guardrail components
. - .
45 Aggregates/Concrete mixes
46 Asphalt
Covered by
WAC 296-127-018
47 Fiber fabrics
x
- ~ -- - - -- - - - - - - - - --- - -
48 Electncal wiring/components
-- -- - -- - - - - --- ~---
49 treated or untreated timber pile
X
- - --- -- - - ----
X
~-- ~- --- ------- - - - -- -- -- - ~-- -- --- ----- - --- -----
50 Girder pads (elastomenc bearing)
X
_nn_______ _________ _ ____ ___
51 Standard Dimension lumber
X
-- - -- --- - ----- - ---- - -- --- -------- -- ------ ------- -
X
52 Irrigation components
Supplemental to Wage Rates
7
WSDOT's
Predetermined List for
Suppliers - Manufactures - Fabricator
ITEM DESCRIPTION
YES
NO
53 Fencing matenals
54. GUide Posts
55 Traffic Buttons
56 Epoxy
x
x
-- - --- ~-~
X
----- ----~-
X
--- - ---------------- ~-- -- - ---- - --- ~--- ----- --
57 Cribbing
- --- -- --
58 Water distnbutlon matenals
-----
59
Steel "Hit piles
- --- --- - - -- -- ------ --- -- - - - -- -- - --
60. Steel pipe for concrete pile casings
-- -
61 Steel pile tipS, standard
_ ___ __ ___ ___n _ _ __
62. Steel pile tipS, custom
Supplemental to Wage Rates
I
I
I
--i
_ _1
,
X
X.
X
x
X
-- - - ---
X
8
State of Washington
Department of Labor and Industries
Prevailing Wage Section - Telephone (360) 902-
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here Include both the hourly wage rate and the hourly rate of fringe
benefits On public works proJects, workers' wage and benefit rates must add to not less than thiS total A
brief description of overtime calculation requirements IS proVided on the Benefit Code Key
METAL FABRICATION (IN SHOP)
EFFECTIVE 08-31-2008
(See Benefit Code Key)
****************************************************************************************************
ClaSSification Code
Prevailing
Wage
Overtime
Code
Holiday
Code
Counties Covered
ADAMS, ASOTIN, COLUMBIA, DOUGLAS, FERRY, FRANKLIN, GARFIELD, KITTITAS
LINCOLN, OKANOGAN, PEND ORIELLE, STEVENS, WALLA WALLA AND WHITMAN
FITTER/WELDER
LABORER
MACHINE OPERATOR
PAINTER
$1276
$813
$1266
$1020
Counties Covered
BENTON
MACHINE OPERATOR
PAINTER
WELDER
$1053
$976
$1670
Counties Covered
CHELAN
FITTER
LABORER
MACHINE OPERATOR
PAINTER
WELDER
$1504
$954
$971
$993
$1224
1
1
1
1
Counties Covered
CLALLAM, GRAYS HARBOR, ISLAND, JEFFERSON, LEWIS, MASON, PACIFIC
SAN JUAN AND SKAGIT
FITTER/WELDER
LABORER
MACHINE OPERATOR
PAINTER
$1516
$1113
$1066
$1141
Supplemental to Wage Rates
1
1
1
1
9
METAL FABRICATION (IN SHOP)
EFFECTIVE 08-31-2008
****************************************************************************************************
Classification Code
FITTER
LABORER
MACHINE OPERATOR
PAINTER
WELDER
LA YEROUT
MACHINE OPERATOR
PAINTER
WELDER
FITTER/WELDER
PAINTER
FITTER
LABORER
MACHINE OPERATOR
PAINTER
WELDER
FITTER
LABORER
MACHINE OPERATOR
WELDER
Supplemental to Wage Rates
(See Benefit Code Key)
Prevailing
Wage
Counties Covered
CLARK
$28 63
$20 35
$2991
$26 45
$28 03
$29 91
Counties Covered
COWLITZ
$24 46
$24 46
$24 46
Counties Covered
GRANT
$1079
$807
Counties Covered
KING
$1586
$978
$1304
$11 10
1548
Counties Covered
KITSAP
$26 96
$807
$1383
$1383
OvertiMe
Code
1E
1E
1E
1E
1E
1E
1B
1B
1B
Holiday
Code
6H
6H
6H
6H
6H
6H
6V
6V
6V
10
METAL FABRICATION (IN SHOP)
EFFECTIVE 08-31-2008
****************************************************************************************************
ClaSSification Code
FITTER/WELDER
LABORER
MACHINE OPERATOR
PAINTER
FITTER
LABORER
MACHINE OPERATOR
WELDER
FITTER/WELDER
LABORER
MACHINE OPERATOR
PAINTER
FITTER
LABORER
MACHINE OPERATOR
PAINTER
WELDER
Supplemental to Wage Rates
(See Benefit Code Key)
Prevailing
Wage
Counties Covered
KLlCKITAT, SKAMANIA, WAHKIAKUM
$1699
$1044
$1721
$17 03
Counties Covered
PIERCE
$1525
$1032
$13 98
$1398
Counties Covered
SNOHOMISH
$1538
$979
$884
$998
Counties Covered
SPOKANE
$1259
$807
$1326
$1027
$1080
Overtime
Code
1
1
1
1
1
Holiday
Code
11
METAL FABRICATION (IN SHOP)
EFFECTIVE 08-31-2008
****************************************************************************************************
ClaSSification Code
FITTER
LABORER
MACHINE OPERATOR
LAYEROUT
WELDER
FITTER/WELDER
LABORER
MACHINE OPERATOR
FITTER
LABORER
MACHINE OPERATOR
PAINTER
WELDER
Supplemental to Wage Rates
(See Benefit Code Key)
Prevailing
Wage
Counties Covered
THURSTON
$24 88
$1661
$26 95
$26 95
$22 81
Counties Covered-
WHA TeaM
$1381
$900
$1381
Counties Covered
YAKIMA
$1200
$1031
$11 32
$1200
$11 32
Overtime
Code
1A
1A
1A
1A
1A
Holiday
Code
6T
6T
6T
6T
6T
12
FABRICATED PRECAST CONCRETE PRODUCTS
EFFECTIVE 08-31-2008
***************************************************************************************~~*********~
(See Benefit Code Key)
ClaSSification Code
Prevailing
Wage
Overtime
Code
Holiday
Code
Counties Covered
ADAMS, ASOTIN, BENTON, COLUMBIA, DOUGLAS, FERRY, GARFIELD, GRANT, LINCOLN,
OKANOGAN, PEND OREILLE, STEVENS, WALLA WALLA AND WHITMAN
ALL CLASSIFICATIONS
$996
ALL CLASSIFICATIONS
Counties Covered
CHELAN, KITTITAS, KLlCKITAT AND SKAMANIA
861
Counties Covered
CLALLAM, CLARK, COWLITZ, GRAYS HARBOR, ISLAND, JEFFERSON, KITSAP,LEWIS, MASON,
PACIFIC, SAN JUAN, SKAGIT, SNOHOMISH, THURSTON AND WAHKIAKUM
ALL CLASSIFICATIONS
$1350
Counties Covered
FRANKLI\\J
ALL CLASSIFICATIONS
$11 50
Counties Covered
KING
ALL CLASSIFICATIONS
$1315
2K
5B
Counties Covered
PIERCE
ALL CLASSIFICATIONS
$928
Counties Covered
SPOKANE
ALL CLASSIFICATIONS
$20 23
Counties Covered
WHA TCOM
ALL CLASSIFICATIONS
$1367
Counties Covered
YAKIMA
CRAFTSMAN
LABORER
$872
$807
1
1
Supplemental to Wage Rates
13
WSDOT's List of State Occupations not applicable to Heavy and
Highway Construction Projects
This project IS subject to the state hourly minimum rates for wages and fringe benefits In
the contract provIsions, as provided by the state Department of Labor and Industries.
The following list of occupations, IS comprised of those occupations that are not normally
used In the construction of heavy and highway projects
When considering job classifications for use and / or payment when bidding on, or
building heavy and highway construction projects for, or administered by WSDOT, these
Occupations will be excepted from the Included "Washington State Prevailing Wage
Rates For Public Work Contracts" documents
. Electrical Fixture Maintenance Workers
. Electricians - Motor Shop
. Heating Equipment Mechanics
o Industrial Engine and Machine Mechanics
. Industrial Power Vacuum Cleaners
. Inspection, Cleaning, Sealing of Water Systems by Remote Control
. Laborers - Underground Sewer & Water
. Machinists (Hydroelectric Site Work)
. Modular BUildings
. Playground & Park FqUlpment Installers
. Power Equipment Operators - Underground Sewer & Water
. ReSidential *** ALL ASSOCIATED RATES ***
. Sign Makers and Installers (Non-Electrical)
. Sign Makers and Installers (Electncal)
. Stage Rigging Mechanics (Non Structural)
The followmg occupations may be used only as outlined in the preceding text concernmg
"WSDOT's list for Suppliers - Manufacturers - Fabricators"
. Fabricated Precast Concrete Products
. Metal Fabrication (In Shop)
Definitions for the Scope of Work for prevailing wages may be found at the Washington
State Department of Labor and Industries web site and in WAC Chapter 296-127
Supplemental to Wage Rates
14
Washington State Department of Labor and Industries
Policy Statements
(Regarding Production and Delivery of Gravel, Concrete, Asphalt, etc.)
The following two letters from the State Department of Labor and Industries (State L&I)
dated August 18, 1992 and June 18, 1999, clarify the Intent and establish policy for
administrating the prOVisions of WAC 296-127-018 COVERAGE AND EXEMPTIONS OF
WORKERS INVOLVED IN THE PRODUCTION AND DELIVERY OF GRAVEL,
CONCRETE, ASPHALT, OR SIMILAR MATERiALS.
Any firm With questions regarding the policy, these letters, or for determinations of
covered and non-covered workers shall be directed to State L&I at (360) 902-5330
c;
EffectIve September 1, 1993, minimum prevailing wages for all work covered by WAC
296-127-018 for the production and/or delivery of materials to a publiC works contract will
be found under the regular classification of work for Teamsters, Power Equipment
Operators, etc.
- -.- --
Supplemental to Wage Rates
15
ESAC DIVISION - TELEPHONE (206) 586-6887
PO BOX 44540, OLYMPIA, WASHINGTON 98504-4540
August 18, 1992
TO'
FROM
All Interested Parties
SUBJECT
Jim P Christensen
Acting Industnal Statistician
Materials Suppliers - WAC 296-127-018
This memo IS Intended to provide greater clanty regarding the application of ~AC296-
127-018 to awarding agencies, contractors, subcontractors, matenal suppliers and other
Interested parties The Information contaIned herein should not be construed to cover all
possible scenanos which might require the payment of prevailing wage The absence .of
a particular activity under the heading "PREVAILING WAGES ARE REQUIRED.FOR"
does not mean that the activity is not covered.
Separate Material Supplier Equipment Operator rates have been eliminated. For those
cases where a production facility is set up for the specific purpose of supplying matenals
to a public: works construction site, prevailing wage rates for operators of .equipment
such as crushers and batch plants can be found under Power Equipment Operators.
PREVAILING WAGES ARE REQUIRED FOR:
Hauling materials away from a public works project Site, including excavated
matenals, demolished materials, etc.
2 Delivery of materials to a public works project site using a method that involves
incorporation of the delivered materials into the project Site, such as spreading,
leveling, rolling, etc.
3 The production of materials at a faCIlity that is established for the specific, but not
necessanly exclusive, purpose of supplying matenals for a public works project
4. Delivery of the materrals mentioned in #3 above, regardless of the metl10d of
delivery.
PREVAILING WAGES ARE NOT REQUIRED FOR:
1 The production of materials by employees of an established matenals supplier, in a
permanent faCIlity, as well as the delivery of these matenals, as long as df:llvery
does not Include incorporation of the materials Into the job site
2. Delivery of materials by a common or contract carner, as long 0;:; delivery does not
include Incorporation of the materrals into the job site
3 Production of materials for unspecified future use
Supplemental to Wage Rates
16
STA TE OF WASHINGTON
DEPARTMENT OF LABOR AND INDUSTRIES
June 18, 1999
TO
Kerry S Radcliff, Editor
Washington State Register
FROM
Gary Moore, Director
Department of Labor and Industnes
SUBJECT
Notice re WAC 296-127-018, COh~rage and exemptions of wor~ers
involved in the production and delivery of grav(,!l, concn':!te, asphf;.llt,
or similar materials
~::: -:-
The department wishes to publish the following Notice in the next edition of the_,_ ' _
Washington State Register ~ .------ ~-- =--=:-:=--
NOTICE
Under the current material supplier regulations, WAC 296-127-018, thc'"
department takes the position that prevailing wages do not apply to'the
delivery of wet concrete to public works sites, unless the dnvers do
something more than Just deliver the concrete Dnvers delivering
concrete into a crane and bucket, hopper of a r)ump trut,k, or fOi'rns (II _.
footings, are not entitled to prevailing wages unless ttley operate
machinery or use tools that screed, float, or put a finish on the concrete
This position applies only to the delivery of wet concrete It does not
extend to the delivery of asphalt, sand, gravel, crushed rock, or other __,
similar materials covered under WAC 296-127-018. The department's'
position applies only to this regulation.
If you need additional Information regarding this matter, please cont8ct
Greg Mowat, Program Manager, Employment Standards, at
P.O. Box 44510, Olympia, WA 98504-4510, or ~all (360) 902-5310.
Please publish the above Notice in WSR 99-13. If you have questions or need
additional Information, please call Selwyn Walters at 902-4206 Thank you.
Cc Selwyn Walters, Rules Coordinator
Patrick Woods, ASSistant Director
Greg Mowat, Program Manager
Supplemental to Wage Rates
17
BENEFIT CODE KEY - EFFECTIVE 08-31-08
*~******~~**********~*****~***************~*********~******4**~*~**~~~~*********************************~**~***~********
OVERTIME CODES
OVERTIME CALCULATIONS ARE BASED ON TilE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC
WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MII'IUS THE
HOURLY RATE OFTHE COST OF FRINGE BE1\lEFITS ACTUALLY PROVIDED FOR THE WORKER.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID ATONE
AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE
A ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLlDA YS SHALL ALSO BE PAID AT ONE AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE
B !\LL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
W AGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE
C THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN
(IO) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL
OTHER OVERTIME HOURS WORKED SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
D THE FIRST TWO (2) HOURS BEFORE OR !\FTER A FIVE - EIGHT (8) HOUR WORKWEEK DAY OR A FOUR - TEN (10)
HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTER EITHER WORKWEEK
SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL ADDITIONAL-HOURS WORKED
AND ALL WORKED ON SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
E THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT
(8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIME~ THE HOURLY RATE OF WAGE ALL
OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON~- SUNDAYS AND-
HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
F THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN
(IO) HOURS.ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOiJRLY RATE~OF WAGE ALL
OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL Ee: PAID AT DOUBLE THE l-iOURLY RATE OF
W AGE ALL HOURS WORKED ON LABOR DAY SHALL BE F AID AT THREE TIMES THE HOURL Y RATE OF VI AGE
~ G THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEl.T (10) HOURS WORKED ON A FIFTH
CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, :;HALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURL Y RATE OF WAGE _ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER. DAY MONDAY ,THROUGH
SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY
RATE OF WAGE
H ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID ATONE AND Ol,TE-HALF TIMES THE HOURL Y~ RA TE OF
WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (I2) HOURS AND ALL HOURS
WORKED ON SUNDA YS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN
(IO) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL
HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE
PAID AT DOUBLE THE HOURL Y RATE OF WAGE
K ALL HOURS WORKED ON SA TURDA YS AND SUNDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y
RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
L ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS
WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL YRA TE OF WAGE
M ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED
ON SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
N ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF TIMES
THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE
THE HOURL Y RA TE OF WAGE
o THE FIRST TEN (10) HOURS WORKED ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE ALL HOURS WORKED ON SUNDAYS, HOLIDAYS AND AFTER TWELVE (12) HOURS, MONDAY
THROUGH FRIDA Y, AND AFTER TEN (10) HOURS ON SA TURDA Y SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF
WAGE
P ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF CIRCUMSTANCES WARRANT) AND SUNDAYS
SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS
SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
BENEFIT CODE KEY c EFFECTIVE 08-31-08
-2-
I '
Q
THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND UP TO TEN (10)
HOURS WORKED ON '3A TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SA TURDA Y AND ALL HOUR~
WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRIST MAS DAY) SH "LL BE PAID AT DOUBLE THE HOURLY
RA TE OF WAGE ALL HOURS WORKED ON CHRISTMAS DA Y SHALL BE PAID AT TWO AND ONE-HALF TIMES THE
HOURL Y RATE OF WAGE
R ALL HOURS WORKED ON SUNDA YS AND HOLlDA YS SHALL BE PAID AT fWO TIMES THE HOURLY RATE OF WAGE
S THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDA Y AND THE FIRST EIGHT
(8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL
OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DA Y, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON LABOR DA Y SHALL BE PAID AT THREE TIMES THE HOURL Y RATE OF WAGE
T WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DA Y, OR TEN (10) HOURS OF STRAIGHT
TIME PER DAY WHEN FOUR TEN (10) HOUR SHIFTS ARE ESTABLISHED, OR fORTY (40) HOURS OF STRAIGHT TIME
PER WEEK, MONDAY THROUGH FRIDAY, OR OUTSIDE THE NORMAL SHIFT AND ALL WORK ON SA TURDA YS
SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME. RATE HOU;~S WORKED OVER rWELVE HOURS (12)
IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SA TURDA Y TO 6 00 AM MONDAY AND HOLIDAYS
SHALL BE PAID AT DOUBLE THE STRAIGHf TIME RATE OF PAY fHE EMPLOYER SHALL HAVE THE SOLE
DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES PRIMARY CONSIDERATION FOR OVERTIME WORK
SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE WORK TO BE PERFORMED ON OVERTIME
SITUATIONS AFTER AN EMPLOYEE HAS WORKED EIGHT (8) HOURS AT AN APPLICABLE OVERTIME'RATE, ALL
ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS
HAD A BREAK OF EIGHT (8) HOURS OR MORE
U ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF rIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES
THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE
HOURLY RATE OF WAGE
V ALL HOURS WOR\5-ED ON SA TURDA YS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY "NO CHRISTMAS
DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON
THANKSGIVING DAY AND CHRISTMAS DA Y SHALL BE PAID AT DOUBLE THE l{OURL Y RATE OF WAGE
W ALL HOURS WORKED ON SA TURDA YS AND SUNDA YS (EXCEPT MAKE-UP DA YS DUE TO CONDITIONS BEYOND THE
CONTROL OF THE EMPLOYER)) SHALL Bl:. PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE ALL
HOURS WORKED ON HOLlDA YS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
X THE FIRST FOUR (4) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
TWEL VE (12) HOURS ON SA TURDA Y SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RA Tt OF WAGE
ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SA TURDA y, SUNDAYS AND HOLIDAYS
SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE WHEN HOLIDAy FALLS ON SATURDAY OR SUNDAY,
THE DAY BEFORE SA TURDA Y, FRIDAY, AND THE DAY AFTER SUNDAY, MONDAY, SHALL BE CONSIDERED THE
HOLIDA Y AND ALL WORK PERFORMED SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
Y ALL HOURS WORKED OUTSIDE THE HOURS OF 5 00 AM AND 5 00 PM (OR SUCH OTHER HOURS AS MAYBE AGREED
UPON BY ANY EMPLOYER AND THE EMPLOYEE) AND ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER
DA Y (10 HOURS PER DAY FOR A 4 X 10 WORKWEEK) AND ON SATURDAYS AND HOLIDA YS (EXCEPT LABOR DAY)
SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE (EXCEPT FOR EMPLOYEES WHO ARE
ABSENT FROM WORK WITHOUT PRIOR APROVAL ON A SCHEDULED WORKDAY DURING THE-WORKWEEK SHALL
BE PAID AT THE STRAIGHT-TIME RATE UNTIL THEY HAVE WORKED 8 HOLJRS IN A DAY (10 IN ^ 4 X 10
WORKWEEK) OR 40 HOURS DURING THAT WORK WEEK) ALL HOURS WORKED MONDAY THROUGH SA TURDA Y
OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND LABOR DAY SHALL BE PAID AT DOUBLE
THE HOURL Y RATE OF WAGE
- 2 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE
AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE
A THE FIRST SIX (6) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON SUNDA YS
AND HOLlDA YS SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE
B ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE
C ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE
ALL HOURS WORKED ON HOLlDA YS SHALL BE PAID AT TWO TIMES THE HOURL Y RATE OF WAGE
o ALL HOURS WORKED ON SA TURDA YS AND SUNDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y
RA TE OF WAGE THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN
2
BENEFIT CODE KEY - EFFECTIVE 08-31-08
-3-
ADDITION TO THE HOLIDAY PA Y ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE
P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
E
ALL HOURS WORKED ON SA TURDA YS OR HOLIDAYS (EXCEPT LABOR DA Y) ~HALL BE PAID ATONE AND ONE-
HALF TIMES THE HOURLY RATE Of. WAGE ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE
PAID AT TWO TIMES THE HOURLY RA TE OF WAGE
F
TIlE FIRST l::IGHT (8) HOURS WORKED ON HOLlDA YS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE
IN ADDITION TO THE HOLlDA Y PA Y ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLlDA YS SHALL
BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
G
ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS
WORKED ON PAID HGLlDA YS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
INCLUDING HOLIDAY PA Y
H
ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS
WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIME') THE HOURL Y RATE OF WAGE
ALL HOURS WORKED ON SA TURDA YS AND HOLIDAY,) (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-
HALF TIMES THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND ON LABOR DA Y SHALL BE
PAID AT TWO TIMES THE HOURL Y RATE OF WAGE
K
ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE,
INCLUDING mE HOLIDAY PAY ALL HOURS WORKED O;-..r UNPAID HOLIDAYS SHALL BE PAID-AT lWO TIMES THE
HOURL Y RATE OF WAGE
ALL HOURS WORKED ON HOLIDA YS SHALL BE FAID AT TWO TIMES THE HOURL Y RATE OF WAGE IN ADDITION TO
THE HOLlDA Y PA Y
M
ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDA YS SHALL BE PAID AT DOUBLE THE I-IOURL Y RATE
OF WAGE
o
ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALFTIMES THE HOURLY
RATE Of WAGE ~
P
THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
W AGE ALL HOURS WORKED IN EXCESS OF EIGHT 8) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON
SUNDA YS AND HOLlDA YS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE
Q
ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
- 4A ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) l-iOtJkS PER WEEK SHALL BE PAID AT
DOUBLE
THE HOURL Y RATE OF WAGE ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT
DOUBLE THE HOURL Y RATE OF WAGE
5
flOLIDA Y CODES
A
HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, FRIDAY
AFTER THANKSGIVING DA Y AND CHRISTMAS DAY (7)
- .B HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVING DA Y, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8)
C HOLIDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DA Y, THE FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (8)
o HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE
FRIDA Y AND SA TURDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8)
E HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, PRESIDENTIAL
ELECTION DA Y, THANKSGIVING DA Y, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DA Y (8)
F HOLIDA YS NE\V YEAR'S DAY, MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING
DA Y, AND CHRISTMAS DAY (II)
G HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, THANKSGIVING DAY, THE
LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DA Y (7)
N
- P
Q
R
.' S
T
6 -
BENEFIT CODE KEY - EFFECTIVE 08-31-08
-4-
H HOLlDA YS NEW YEAR'S DAY. MEMORIAL DAY, INDEPENDENCE DAY THANKSGIVING DAY, THE DAY AFTER
THANKSGIVING DA Y, AND CHRISTMAS (6)
HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY (6)
l-IOLlDA YS NEW YEAR'S DAY MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, FRIDAY AFTER
THANKSGIVING DAY, CHRISTMAS EVE DA Y, AND CHRISTMAS DA Y (7)
K HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DA Y, FRIDAY AFTER THANKSGIVING DA Y, THE DAY BEFORE CHRISTMAS AND CHRISTMAS DAY
(9)
L HOLIDA YS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DA Y, THANKSGIVING DA Y, FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DAY (8)
M HOLlDA YS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DA Y, INDEPENDENCE DA Y, LABOR
DA Y, THANKSGIVING DA Y. FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS AND CHRISTMAS
DAY (9)
HOLlDA YS NEW YEAR'S DA Y, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, VETERANS'
DA Y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (9)
HOLlDA YS NEW YEAR'S DA Y, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y, THANKSGIVING DAY, FRlDA Y
AND SA TURDA Y AFTER THANKSGIVING DAY, THE DAY BEFORE CHRIST~tlAS, AND CHRISTMAS DAY (9)-
PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY.
AND CHRISTMAS DAY (6)
PAID HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
DA Y AFTER THANKSGIVING DAY, ONE-HALF DA Y BEFORE CHRISTMAS DAY, AND CHRISTMAS DA Y (7 II2)
PAID HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y
THANKSGIVING DAY, AND CHRISTMAS DAY (7)
PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DA y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY BEFORE OR
AFTER CHRISTMAS (IO)
U PAID HOLIDAYS NEW YEAR'S DAY. MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING DA Y, AND CHRISTMAS DAY (8) -
V PAID HOLlDA YS SIX (6) PAID HOLIDAYS
W PAID HOLlDA YS NINE (9) PAID HOLlOA YS
X HOLlDA YS AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY AFTER 2080
HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DA Y AND A FLOATING HOLIDAY (8)
Y HOLlDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DA Y, THANKSGIVING DAY, THE FRIDA Y FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8)
Z HOLlDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VE1ERANS DAY,
THANKSGIVING DA Y, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8)
A
PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DA Y, AND CHRISTMAS DA Y (8)
B PAID HOLlDA YS NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DA Y, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE'S DAY, AND CHRISTMAS DAY (9)
C HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE DA Y AFTER THANKSGIVING DAY, THE LAST WORK DA Y BEFORE CHRISTMAS DAY, AND
CHRISTMAS DAY (9)
D PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY. THE DAY BEFORE OR THE DAY
AFTER CHRISTMAS DAY (9)
BENEFIT CODE KEY - EFFECTIVE 08-31-08
-5-
E PAID HOLIDAyS NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRE<;IDENTS DAY, MEMORIAL
DA Y, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS
DA Y. AND A HALF-DAY ON CHRISTMAS EVE DAY (9 1/2)
F PAID HOLIDAYS NEW YEAR'S DAY. MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS' DA Y, THANK:,GIVING DA Y. THE DA Y AFTER THANKSGIVING DA Y,
AND CHRISTMAS DA Y (I I)
G PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY,
INDEPENDENCE DAY. LABOR DAY, VETERANS' DAY, THANKSGIVING DAY THE FRIDAY AFTER THANKSGIVING
DA Y, CHRISTMAS DAY, AND CHRISTMAS EVE DAY (Ii)
H PAID HOLIDA YS NEW YEAR'S DAy, NEW YEAR'S EVE DAY, MEMORIAL DAY, INDEPENDENCE DAY. LABOR DA Y,
THANKSGIVING DA Y, FRIDA Y AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A
FLOATING HOLIDA Y (I 0) .
PAID HOLIDA YS NEW YEAR'S DA Y, MEMORIAL DA Y, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING
DA Y, FRIDA Y AFTER THANKSGIVING DA Y. AND CHRISTMAS DAY (7)
PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DA Y. THA.NKSGIVING
DA Y, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS, AND A
FLOA TING HOLlDA Y (9)
L HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y. LABOR DAY, THANKSGIVING DAY,
THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND
CHRISTMAS DA Y (8)
Q PAID HOLlDA YS NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DA Y. LABOR DAY. VETERANS DA Y,
THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY (8) UNPAID hOLIDAY,
PRESIDENTS' DA Y
T PAID HOLlDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, ,NDEPDJDENCE DAY, LABOR
DA Y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, THE LAST WC~,KING DAY BEFORE
CHRISTMAS DAY, AND CHRISTMAS DAY (9)
U HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, :~,.rDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BHORE
CHRISTMAS DAY, CHRISTMAS DAY (9)
V PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DA Y, INDEPENDENCE DAY, LABOR DA Y, THANKSGIVING
DA Y, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, AND ONE DAY OF THE
EMPLOYEE'S CHOICE (9)
W PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENfS DAy, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DA Y, CHIZISTMAS
DA Y, DA Y BEFORE OR AFTER CHRISTMAS DAY (10)
X PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY OA Y AFTER THANKSGIVING
DA Y, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (I I)
NOTE CODES
8
A
THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN f..DDITION TO
THE HOURL Y WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPL Y TO DEPTHS OF FIFTY FEET
OR MORE
OVER 50' TO 100' - $100 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100' TO 175' - $2 25 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 175' TO 250' - $5 50 PER FOOT FOR EACH FOOT OVER 175 FEET
OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO LESS THAN THE SCALE LISTED
FOR 250 FEET
C THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN ADDITION TO
THE HOURL Y WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPL Y TO DEPTHS OF FIFTY FEET
OR MORE
OVER 50' TO 100' - $100 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100' TO 150' - $ I 50 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 150' TO 200' - $2 00 PER FOOT FOR EACH FOOT OVER 150 FEET
BENEFIT CODE KEY - EFFECTIVE 08-31-08
-6-
OVER 200' - DIVERS MA Y NAME THEIR OWN PRICE
D WORKERS WORKING WITH SUPPLIED AIR ON HAZMA T PROJECTS RECEIVE AN ADDITIONAL 'j; 1 00 PER HOUR
L WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A $075,
LEVEL B $0 50, AND LEVEL C $025
M WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURL Y PREMIUM~ AS FOLLOWS LEVELS A & B $ I 00
LEVELS C & D $0 50
N -- WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS fOLLOWS - LEVEL A $ I 00
LEVEL B $075, LEVEL C $050, AND LEVEL D $025
State of Washington
DEPARTMENT OF LABOR AND INDUSTRIES
Prevailing Wage Section - Telephone (360) 902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage Rates For Public WOiks Contracts
The PREVAILING WAGES listed here Include both the hourly wage rate and the hourly rate of fnnge benefits
On public works projects, workers' wage and benefit rates must add to not less than thiS total A brief descnptlon
of overtime calculation requirements IS provided on the Benefit Code Key
CLALLAM COUNTY
EFFECTIVE 08-31-2008
***********************************************************************************~**********************
ClaSSification
ASBESTOS ABATE:MENT WORKERS
JOURNEY LEva
BOILERMAKERS
,JOURNEY LEVEL
BRICK AND MARALE MASONS
JOURNEY LEVEL
CABINET MAKERS (IN SHOP)
JOURNEY LEVEL
CARPENTERS
ACOUSTICAL WORKE'R
BRIDGE, DOCK AND WARF CARPENTERS
C:ARPENTER
CREOSOTED MA TERI/\L
DRYWALL APPLlCA10R
FLOOR FINISHER
FLOOR LAYER
FLOOR SANDER
MILLWRIGHT AND MACHINE ERECTORS
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDIt'-JG
SAWFILER
SHINGl ER
STATIONARY POWER SAW OPERATOR
STATIONARY WOODWORKING TOOLS
CEMENT MASONS
JOURNEY LEVEL
DIVERS & TENDERS
DIVER
DIVER TENDER
DREDGE WORKERS
ASSISTANT ENGINEER
ASSISTANT MATE (DECKHAND)
BOATMEN
ENGINEER WELDER
LEVERMAN, HYDRAULIC
MAINTENANCE
MATES
OILER
DRYWALL TAPERS
JOURNEY LEVEL
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEY LEVEL
Page 1
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
WAGE CodE: Code Code
$38 06 1H 5D'
$50 33 1C 5N'
$45 05 1M 5A
, "
$1467
$46 32 1M ' 50
$4616 1M bD
$46 16 1M ' 5D
$4fl ::'5 1M 'SO
$46 47 1M 50
$46 16 1M 50
$46 16 1M 50
$46 16 1M sD
$47 16 1M "50
$46 36 1M t.0
$46 16 1 r\~ 50'
$46 16 1M 50
$46 16 1M ,50
$46 16 1M 50 '
$38 06 1H 50
$92 31 1M ,50 8A
$49 84 1M 50
$4709 1T 5D 8L
$46 58 1T 50 8L
$47 09 1T 50 8L
$47 14 1T 50 8L
$48 71 1T 50 8L
$46 58 1T 50 8L
$47 09 1T 50 8L
$46 71 1T 50 8L
$46 04 1E 5P
$937
CLALLAM COUNTY
EFFECTIVE 08-31-2008
**********************************************************************************************************
ClaSSification
PREVAILING
WAGE
ELECTRICIANS - INSIDE
CABLE SPLICER
CABLE SPLICER (TUNNEL)
CERTIFIED WELDER
CERTIFIED WELDER (TUNNEL)
CONSTRUCTION STOCK PERSON
JOURNEY LEVEL
JOURNEY LEVEL (TUNNEL)
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN
JOURNEY LEVEL
ELECTRICIANS - POWERLlNE CONSTRUCTION
CABLE SPLICER
CERTIFIED LINE WELDER
GROUNDPERSON
PlEAD GROUNDPERSON
HE.AVY LINE EQUIPMENT OPERATOR
JACKHAMMER OPERATOR
JOURNEY LEVEL -L1NEPERSON
LINE EQUiPMENT OPERATOR
POLE SPRAYER
POWDERPERSON
ELECTRONIC 1 ECHNICIA!\~S .
E:LE.C mONIC TECHNICIANS JOURNEY LEVEL
ELEVATOR CONSTRUCTORS
MECHANIC
MECHANIC IN CHARGE
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS
FENCE ERECTORS
FENCE ERECTOR
FENCE LABORER
I:LAGGERS
JOURNEY LEVEL
GLAZIERS
,JOURNEY LEVEL
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC
HEATING EQUIPMENT MECHANICS
MECHANIC
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL
INDUSTRIAL ENGINE AND MACHINE MECHANICS
MECHANIC
INDUSTRIAL POWER VACUUM CLEANER
JOURNEY LEVEL
INLAND BOATMEN
CAPTAIN
COOK
DECKHAND
ENGINEER/DECKHAND
MATE, LAUNCH OPERATOR
$58 34
$62 86
$56 29
$60 60
$28 83
$54 25
$58 34
$1537
$14 69
$56 53
$51 64
$37 15
$39 19
$51 64
$39 19
$51 64
$43 83
$51 G4
$39 19
$1207
$60 85
$66 25
$13 50
$13 80
$11 bO
$32 41
$45 20
$47 58
$16 00
$39 25
1H
50
$15 65
$924
$59 22
$3481
$34 52
$58 62
$50 20
Page 2
CLALLAM COUNTY
EFFECTIVE 08-31-2008
***************************************************************k*******************************~**********
,Cl3sslflcallon
INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY
REMOTE CONTROL
CLEANER OPERATOR, FOAMER OPERATOR
GROUT TRUCK OPERATOR
HEAD OPERATOR
TECHNICIAN
TV TRUCK OPERATOR
INSULATION APPLICATORS
JOURNEY LEVEL
IRONWORKERS
JOURNEY LEVEL
LABORERS
ASPHALT RAKER
BALLAST REGULATOR MACHINE
BATCH WEIGHMAN
BRUSH CUTTER
BRUSH HOG FEEDER
BURNERS
CARPENTER TENDER
CASSION WORKER
CEMENT DUMPER/PAVING
CEMENT FINISHER TENDER
CHANGE-HOUSE MAN OR DRY SHACKMAN
CHIPPING GUN (OVER 30 LBS)
CHIPPING GUNiUNDER 30 LBS)
CHOKER SETTER
CHUCK TENDER
CLEAN-UP LABORER
CONCRETE DUMPER/CHUTE OPERATOR
CONCRETE FORM STRIPPER
CONCRETE SAW OPERATOR
CRUSHER FEEDER
CURING LABORER.
DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED MATERIALS)
DITCH DIGGER
DIVER
DRILL OPERATOR (HYDRAULIC, DIP-MONO)
DRILL OPERATOR, AIRTRAC
OUMPMAN
EPOXY TECHNICIAN
EROSION CONTROL WORKER
FALLER/BUCKER, CHAIN SAW
FINAL DETAIL CLEANUP (I e , dusting, vacuuming, Window cleaning NOT
construction debriS cleanup)
FINE GRADERS
FIRE WATCH
FORM SETTER
GABION BASKET BUILDER
GENERAL LABORER
GRADE CHECKER & TRANSIT PERSON
GRINDERS
GROUT MACHINE TENDER
Page 3
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
WAGE Code Code' Code
$973 1 -
$11 48 1
$1278 1-
$807 1
$1053 . 1
$20 50 ' 1
$50 77 1.0 SA
.-
$38 77 lH 50
$38 06 .1H 50
$32 41 c 1H 50
$38 06 - 1H ::;0
$38 06 1H tlD,
$38 06 1J:i. 50---
$38 06 1H. - 50 -
$39 25 i "I 50<
_ $38 77 1H .50-,
$38 06 -_1H ::i0
$38 06 1H 5D
$38 77 1H Sf)'
$38 06 .1H ,',5D
$38 06 11-1 50
$38 06 1H 5D
$38 06 1H 50
$38 77 11-t [,0
$38 06 -1H 50
$38 77 1H 50 -
$32 41 1H 50
$38 06 1H 50
$38 06 !H 50
$38 06 1H 5D
$39 25 1H 5D
$38 77- 1H bD -
$39 25 1H 5D
$38 06 1H 5D
$38 06 1H 50
$38- 06 1H 50
$38 77 1H 50
$29 59 1H 50
$38 06 1H 50
$32 41 1H 50
$38 06 1H 50
$38 06 1H 50
$38 06 1H 50
$38 77 1H 50
$38 06 1H 50
$38 06 1H 5D
CLALLAM COUNTY
EFFECTIVE 08-31-2008
**********************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Qasslflcatlon WAGE Cod~ Code Code
GUARDRAIL ERECTOR $38 06 1H 50
HAZARDOUS WASTE WORKER LEVEL A $39 25 1H 50
HAZARDOUS WASTE WORKER LEVEL B $38 77 1H 50
HAZARDOUS WASTE WORKER LEVEL C $38 06 1H 50
HIGH SCALER $39 25 1H 50
HOD CARRIER/MORTARMAN $'3877 1H 50
JACKHAMMER $38 77 1H 50
LASER BEAM OPERATOR $38 77 1H 50
MANHOLE BUILDER-MUDMAN $38 77 1H 50
MATERIAL YARDMAN $38 06 1H 50
--
MINER $39 25 -1H 50
NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USII'IlG HIGH $38 77 1H 50
PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE,
SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER $38 77 1H 50
PILOT CAR $32 41 1H 50
PIPE POT TENDER $38 77 1H 50
PIPE RELINER (NOT INSERT TYPE) $38 77 1H 50
PIPELAYER & CAULKER $38 77 1H 5D
PIPELA YER & CAULKER (LEAD) $39 L5 11-1 50
PIPEWRAPPER $38 77 1H 50
POT TENDER $38 06 1H 51)
POWDER MAN $39 25 1H 50
POWDERMAN HELPER $3b U6 1H 50
POWERJACKS $38 T1 1H ,,50 '
RAILROAD SPIKE PULLER (POWER) $38 77 1H -50
RE~TIMBERMAN $39 25 1H 50
RIPRAP MAN $38 06 1H 50
RODDER $38 77 1H 50
SCAFFOLD ERECTOR $38 06 1H 50
SCALE PERSON $38 06 1H 50
SIGNALMAN $38 06 1H 50
SLOPER (OVER 20") $38 77 IH 50
SLOPER SPRAYMAN $38 06 1H 50
SPREADER (CLARY POWER OR SIMILARTYPES) $38 77 1H 50
SPREADER (CONCRETE) $38 77 1H 50
STAKE HOPPER $38 06 1H 50_
STOCKPILER $38 06 1H 50
TAMPER & SIMILAR ELECTRIC, AIR & GAS $38 7-7 1H 50
TAMPER (MULTIPLE & SELF PROPELLED) $38 77 1 t I 5D
TOOLROOM MAN (AT JOB SITE) $38 06 1H 50
TOPPER-TAILER $38 06 1H 50
TRACK LABORER $38 06 1H 50
TRACK LINER (POWER) $38 77 1H 50
TRUCK SPOTTER $38 06 1H 50
TUGGER OPERATOR $38 77 1H 50
VIBRATING SCREED (AIR, GAS, OR ELECTRIC) $38 06 1H 50
VIBRATOR $38 77 1H 50
VINYL SEAMER $38 06 1H 50
WELDER $38 06 1H 50
WELL-POINT LABORER $38 77 1H 50
Page 4
CLALLAM COUNTY
EFrEc.;TIVE 08-31-2008
**~*****~**~*************************************************************************w********************
ClaSSification
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER
PIPE LAYER
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS
LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS
LANDSCAPING OR PLANTING LABORERS
LATHERS
JOURNEY LEVEL
METAL FABRICATION (IN SHOP)
FITTER/WELDE'R
LABORER
MACHINE OPERATOR
PAINTER
PAINTERS
JOURNEY LEVEL
PU\STERERS
J(>URNEY LEVEL
PLAY(,ROUND & PARK EQUIPMENT INSTALLERS
JOURNEY LEVEL
f'LUMBE::RS & PIPU-ITTERS
,IOURNEY LEVEL
(,OWER EQUIPMENT OPERATORS
ASSISTANT ENGINEEF1S
BACKHOE, [,XCAVATOr~, SHOVEL (3 YO & UNDER)
BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YO & UNDER 6 YO)
BACKHOE, EXCAVATOR, SHOVEL (6 YO AND OVER WITH ATTACHMENTS)
BACKHOES, (75 HP & UNDER)
BACKHOES, ,(OVER 75 HP)
BARRIER MACHINE (ZIPPER)
BATCH PLANT OPERATOR, CONCRETE
BELT LOADERS (ELEVATING TYPE)
BOB~AT (SKID STEER)
BROOMS
BUMP CUTTER
CABLEWAYS
CHIPPER
COMPRESSORS
CONCRETE FI!-JISH MACHINE - LASER SCREED
CONCRETE PUMPS
CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT
CONVEYORS
CRANES, THRU 19 TONS, WITH ATTACHMENTS
CRANES, 20 - 44 TONS, WITH ATTACHMENTS
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB
WITH AT ACHMENTS)
CRANES, 100 TONS - 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB
WITH ATTACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB
WITH ATTACHMENTS)
CRANES, A-FRAME, 10 TON AND UNDER
CRANES, A-FRAME, OVER 10 TON
Page 5
PREVAILING
WAGE
$38 06
$38 77
$1289
$1289
$1289
$4642
$1516
$11 1:)
$1 0 60
$1141
$33 94
$25 83
$8 Of
$6024
$44611
~~7 42
$47 91
$48 46
$4700
$47 42
- $47 42
$47 42
$47 00
$44 64
$44 64
$47 42
$47 91
$4742
$44 64
$44 64
$4700
$4742
$4700
$47 00
$4742
$47 91
$4B 46
$47 03
$44 64
$47 00
(See Benefit Code Key)
Over
Time Holiday Note
Code _ Code Code
1H 50
1H 50
1
- - 1 ~
1M - 50
- ~i -
2B 5A
',G GA
1T !iU
iT 5[)
1T 50
1T 50,
n- 5D
'11 ' bD
H 50
11 5D
1T 5D
n 50
1T 50
1T 50
1T SO
1T 50
1T 50
1f 50
1T 5D
1T 50
1T 50
H 60
1T 50
IT 50
1T 50
1T 50
1T 50
1T 50
8L
; 8L
8L
8L
8L
8L'
8L
8L
8L
8L
3L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
8L
CLALLAM COUNTY
EFFECTIVE 08-31-2008
****************************************************************~*****************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
ClasSification WAGE- Code Cod~ Code
CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $48 29 n ,M 8L
ATTACHMENTS
CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $47 42 n 50 8L
CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $4791 iT 50 8L
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $48 46 n 5D 8L
- CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $48 46 n 50 8L
CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $47 03 H_ 50 8L'
CRUSHERS $4742 n 50 8L
DECK ENGINEER/DECK WINCHES (POWER) $4742 1T 50 3L
DERRICK, BUILDING $47 91 H_ 50 8L
DOZERS, D-9 & UNDER $47 00 H 50 8L
DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT M700 H 50 8L
DRILLING MACHINE $47 42 n 5D 8L
-
ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $44 64 n 50 8L
.EQUIPMENT SERVICE ENGINEER (OILER) $47 00 _:1T 5D 8L
FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $47 42 n 50 8L
r-GRK LIFTS, (3000 LBS AND OVER) $4700 - -- H 50 8L
FORK LIFTS, (UNDER 3000 LBS) $4~ G4 iT 50 Rl
GRADE ENGINEER $47 00 1T SO 8L
- GRADECHECKER AND ST AKEMAN $44 64 1:1 50 8L
GUARDRAIL PUNCH $47 42 1:r~: '"'C- -_50 8L
,HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $4700 -H 50 8L
HORIZONTAUOIRECTIONAL DRILL LOCATOR $47 00 JL 50 8L
~--- --
HORIZONTAUOIRECTIONAI DRILL OPERATOR $47 42 1T 50 _ _ elL -
'HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $4464 iT _50 _ 8L
HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $47 00 1T 50 8L
LOADERS, OVERHEAD (6 YD UP TO 8 YO) $47 91 H 50 8L
LOADERS, OVERHEAD (8 YO & OVER) $48 46 H- 50 8L
LOADERS, OVERHEAD (UNDER 6 YO), PLANT EEEO $47 42 n ". 5D 8L
LOCOMOTIVES, ALL $4742 '11- 5D at
ME'CHANICS, J\LL $47 91 n -50 8L
MIXERS, ASPHALT PLANT $47 42 1T 50 .8L
MOTOR PATROL GRADER (FINISHING) $4742 n- 50 8L
MOTOR PATROL GRADER (NON-FINISHING) $47 00 n 50 8L
MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $47 91 1L 50 8L
O'L DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $44 64 iT 50 SL
OPERATOR
PAVEOMENT BREAKER $44 64 n 50 8L
PILEDRIVER (OTHER THAN CRANE MOUNT) $47 42 n 5D SL
PLANT OILER (ASP HAL T, CRUSHER) $47 00 11" 51) , 8L
POSTHOLE DIGGER, MECHANICAL $44 64 1T 50 8L
POWER PLANT $44 64 n 50 8L
PUMPS, WATER $44 64 H 5D 8L
QUAD 9, D-10, AND HD-41 $47 91 n 50 8L
REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $47 91 H 50 8L
EQUIP
RIGGER AND BELLMAN $44 64 H 50 8L
ROLLAGON $47 91 H 5D 8L
ROLLER, OTHER THAN PLANT ROAD MIX $44 64 n 5D 8L
ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $47 00 n 5D 8L
ROTO-MILL, ROTO-GRINDER $4742 n 5D 8L
SAWS, CONCRETE $47 00 H 50 8L
Page 6
CLALLAM COUNTY
EFFECTIVE 08-31-2008
**********************************************************************************************************
ClaSSification
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT ( UNDER 45 YO)
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT (45 YO AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL
SCREED MAN
SHOTCRETE GUNITE
SLlPFORM PAVERS
SPREADER, TOPSIDE Of:'ERATOR - BLAW KNOX
SUBGRADE TRIMMER
TOWER BUCKET ELEVATORS
TRACTORS, (75 HP & UNDER)
JHACTORS, (OVER 75 HP)
TRANSFER MATERIAL SERVICE MACHINE
TRANSPORTERS, ALL TRACK OR TRUCK TYPE
TRENCHING MACHINES
TRUCK CRANE OILER/DRIVER (UNDER 100 TON)
TRUCK CRANE OILER/DRIVER (100 TOI-J & OVER)
TRUCK MOUNT PORTABLE CONVEYER
. WHEEL TRACTO~S, FARMALL TYPE
YO YO PAY DOZER
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
f'OWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVEL IN CHARGE
SPRAY PERSON
TREE EQUIPMENT OPERATOR
TREE TRIMMER
TREE TRIMMER GROUNDPERSON
RErRlGERATION & AIR CONDITiONING MECHANICS
MECHANIC
RESIDENTIAL BRICK & MARBLE MASONS
JOURNEY LEVEL
RESIDENTIAL CARPENTERS
JOURNEY LEVEL
RESIDENTIAL CEMENT MASONS
JOURNEY LEVEL
RESIDENTIAL DRYWALL TAPERS
JOURNEY LEVEL
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL
RESIDENTIAL GLAZIERS
,JOURNEY LEVEL
RESIDENTIAL INSULATION APPLICATORS
JOURNEY LEVEL
RESIDENTIAL LABORERS
JOURNEY LEVEL
RESIDENTIAL PAINTERS
JOURNEY LEVEL
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEY LEVEL
Page 7
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
WAGE Code Code Code
$4742 H 50 . SL
$47 91 H 50 -SL
$47 00 H 50 SL
$47 42 1T 50 8L
$44 64 1T 50 SL
$47 91 .H 50 SL
$4742 H 50. 8L
$4742 1T 5LJ SL
$4700 1T 50 SL
$47 00 H 5D SL
$4747 H 50 S:_
$47 42 H 50 SL
- -
$4791 .H 50 SL
$47 00 1T 50 SL
$47 00 1T 50 SL
$4742 H ~D SL
$47 42 H 50 SL
$446Ll 1T- 50 Sl"
$47 tl.? -H 50 _uSL
$3761
$35 73
$36 19
$33 69
$25 43
~.A 5A
I~A SA
4A SA
4A 5A
4A .5A
$27 68
$45 05
--1M
SA
$1785
$25 63
. 1
$1800
- -~
$27 78
$21 36
1 .
$986
$1808
$1597
$14 60
CLALLAM COUNTY
EFFECTIVE 08-31-2008
~**********************k*************************************************************~********************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
,ClaSSification WAGf,. kode Code Cogg
RESIDENTIAL REFRIGERATION & AIR CONDITIONING MECHANICS
JOURNEY LEVEL $5621 1G SA
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $33 59 1E 6L
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEY LEVEL $1 0 88
RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL $1967
ROOf-ERS
JOURNEY LEVEL $38 28 1R SA
USING IRRITABLE BITUMINOUS MATERIALS $41 28 IR SA
SHeET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $54 07 1E 6L
SHIPBUILDING & SHIP REPAIR
BOIL ERMAKER $32 ~E) 1H 6W.
HEAT & FROST INSULATOR $47 58 is SJ
LABORER $1216 1
MACHINIS r $171G 1
SH:PFITTER $14 Be, 1
WELDER/BURNER $11l 66 1
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEY LEVEL $19 ?Si
SIGN MAKERS & INSTALLEHS (NON.-ELECTRICAL)
JOURNEY LEVEL $1215
SOFT FLOOR LAYERS
JOURNEY LEVEL $37 08 18 5A
SOLAR CONTROLS FOR WINDOWS
JOURNEY LEVEL $1031 1B 50
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVE:L . $19 61
STAGE RIGGING MECHANICS (NON STRUCTURAL)
JOURNEY LEVEL $1323
SURVEYORS
CHAIN PERSON $935 1
INSTRUMENT PERSON $11 40 -- 1
PAR fY CHIEF $13 40
TELECOMMUNICATION TECHNICIANS
TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $323-1 1E liA
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CA8LE SPLICER $31 46 28 5A
HOLE DIGGER/GROUND PERSON $17 58 28 5A
INSTALLER (REPAIRER) $30 17 28 SA
JOlJRNEY LEVEL TELEPHONE L1NEPERSON $29 26 28 5A
SPECIAL APPARATUS INSTALLER I $31 46 28 5A
SPECIAL APPARATUS INSTALLER II $30 82 28 5A
TELEPHONE EQUIPMENT OPERATOR (HEAVY) $31 46 28 SA
TELEPHONE EQUIPMENT OPERATOR (LIGHT) $29 26 28 5A
TELEVISION GROUND PERSON $1667 28 5A
TELEVISION L1NEPERSONIINST ALLER $22 19 28 5A
TELEVISION SYSTEM TECHNICIAN $26 42 2B 5A
TELEVISION TECHNICIAN $23 76 28 5A
TREE TRIMMER $29 26 28 5A
Page 8
CLALLAM COUNTY
EFFECTIVE 08-31-2008
*****************************************************************************k****************************
C!asslflcatlon
PREVAILING
WAGE
TERRAZZO WORKERS & TILE SETTERS
JOURNEY LEVEL
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL
TRUCK DRIVERS
ASPHALT MIX (TO 16 YARDS)
ASPHALT MIX (OVER 16 YARDS)
DUMP TRUCK
DUMP TRUCK & TRAILER
m HER TRUCKS
TRANSIT MIXER
WELL DRILLERS 8. IRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER
OILER
WELL DRILLER
$4361
$37 44
$37 90
$43 45
$4.1 25
$20 23
$20 23
$44 25
$23 73
$11 60
$945
$11 60
Page 9
(See Benefit Code Key)
Over
Time
- Code
Hollaay
.Gode
Note
Cod~
- - 1M 5A
lB 5A
-~ --"--
-1K 5A
, ,-~-
1T 5D 8L
-1.:r-- 5D 8L
1:.-
t -
1T 5') 8L
:-1 _. - --
- -~.--
-c
r -- -
1~
.- --- ~-
</.5C16L..
PROCLAMATION OF EMERGENCY
WHEREAS, in the late afternoon of September 8, 2008, a 12 inch water main ruptured under
Highway 101 causing damage to Highway 101 and adjoining property; and
WHEREAS, the City does not have equipment able to excavate the site to the depth of the
water main, necessitating contracting with Craig Barr Excavating to excavate the site; and
WHEREAS, Highway 101 must remain closed until the roadbed can be repaired; and
WHEREAS, Highway 101 is a vital thoroughfare through the City of Port Angeles; and
WHEREAS, Lakeside Industries is the only local contractor available to make immediate
repairs to the sub grade and roadbed of Highway 101; and
WHEREAS, the total cost of repairs is estimated to be $125,000.00; and
WHEREAS, RCW 39.04.280(1)(e) allows an exception to normal bidding requirements for
public works in the event of an emergency;
NOW, THEREFORE,
1. There is hereby declared in the City of Port Angeles a state of emergency due to the
rupture of a 12 inch water main on Highway 101 on the afternoon of September 8, 2008.
2. There is a critical need to restore water service for drinking water and fire fighting and
to restore access to Highway 101, a major arterial highway serving Port Angeles.
-1-
3. Pursuant to RCW 39.04.280(1)(e), an exception to normal bidding requirements is
declared for repair of the water main pipes and for repair of Highway 101 subgrade and roadbed
damaged as a result of the water main rupture.
4. The Public Works and Utilities Department is authorized to contract as necessary for
repair of the water main pipes, and the Highway 101 subgrade and roadbed in the area of the water
main rupture in the approximate amount of$125,000.00.
Dated this 9th day of September, 2008.
~ L f} ~......-'
Jerald Osterman, City Manager
Attest:
6~~J..AF^-
Becky J. U n, ity Cle
Approved as to form:
iY:::l11~\tO~/4#X ~~
G ILeg.I_B.ckupIPROCLAMATIONSlProcl.m.tlOn-Emergency Front St Rep'If' 090908 wpd
-2-