Loading...
HomeMy WebLinkAbout10062026 CC Agenda PacketTuesday October 6, 2026 Port Angeles City Council Meeting Page 1 October 6, 2026 City of Port Angeles Council Meeting Agenda This meeting will be conducted as a hybrid meeting. In hybrid meetings, members of the public, Council members, and City sta ff have the option to attend the meeting in person, in Council chambers at City Hall located at 321 East 5 th Street, Port Angeles, or remotely via telephone or video link. The Mayor may determine the order of business for a particular City Council meeting. The agenda should be arranged to best serve the needs and/or convenience of the Council and the public. The Mayor will determine time of break. Hearing devices are available for those needing assistance. The items of business for regular Council meetings may include the following: A.Call to Order – Special Meeting at 5:30 p.m. – The City Council will convene in Executive Session as authorized under RCW 42.30.110 in order to discuss potential litigation with its legal counsel, per RCW 42.30.110(1)(i). Call to Order – Regular Meeting at 6:00 p.m. B.Roll Call, Pledge of Allegiance Ceremonial Matters, Proclamations & Employee Recognitions 1.Proclamation in Recognition of Indigenous People’s Day C.Late Items To be placed on this or future agendas, including any executive session needed during or at the end of the meeting. D.Public Comment The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an orderly and timely manner. Visit https://www.cityofpa.us/Live-Virtual-Meetings to learn how to participate during public comment and or watch the meeting live. Written public comments can be submitted to: council@cityofpa.us, comments will not be read aloud. Audio only: 1-844-992-4726 Access code (webinar number): 2551 691 2595 Webinar password: K6UweJJ2iJ8 (56893552 when dialing from a phone or video system) Once connected, press *3 to raise your virtual hand if you wish to make a comment or public testimony. You will be notified when it is your turn to speak. Webex link: https://cityofpa.webex.com/cityofpa/j.php?MTID=m88dac057e25054c802195370b1025a6a To make a public comment, please use the “raise your hand” feature in Webex. You will be notified when it is your turn to speak. These access codes are good for the Tuesday, October 6, 2026 meeting only. Members of the public may address the City Council at the beginning and end of any Regular Meeting under "Public Comment." During the "Public Comment" portion of the meeting, individuals may speak to agenda items, except those scheduled for a Public Hearing. The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an orderly, timely manner. At any time, the presiding officer, in the presiding officer's sole discretion, may set such reasonable limits as are necessary to prevent disruption of other necessary business. At its most restrictive, Public Comment shall be limited to a total of 15 minutes for the first Public Comment period and shall be concluded not later than 9:45 for the second Public Comment period. Individuals may speak for three (3) minutes or less, depending on the number of people wishing to speak. If more than 20 people are signed up to speak each speaker may be allocated two (2) minutes. Tuesday October 6, 2026 Port Angeles City Council Meeting Page 2 Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference given to those who wish to speak to an item on the meeting’s agenda. If time remains, the presiding officer will call other individuals wishing to speak, generally in the order in which they have signed in. If time is available, the presiding officer may call for additional unsigned speakers. Persons speaking shall state their name, whether they reside within the City limits, whether they have any other pertinent connection to the City, and whether they are appearing as the representative of an organization. Excerpts: Council Rules of Procedure Section 12 E. Consent Agenda | Approve 1. Minutes from September 15, 2026 / Approve ................................................................................................. E-1 2. Expenditure Report: Between September 5, 2026 and September 25, 2026 in the amount of $4,448,734.51 / Approve ........................................................................................................................................................... E-7 3. Light-Ops Material Purchase (240 meters) / 1) Approve the purchase of two hundred and forty (240) electric meters from WESCO of Portland, OR, through the Sourcewell cooperative purchasing agreement, in the amount of $36,843.92, including applicable taxes; and 2) authorize the City Manager to sign all contract-related documents, to administer the contract, and to make minor modifications as necessary. ............................. E-37 4. Interagency Agreement Between WA Traffic Safety Commission and the Port Angeles Police Department / City of Port Angeles / 1) Approve the Interagency Agreement between the Washington Traffic Safety Commission and the City of Port Angeles for its Police Department for the period of performance between October 1, 2026, and September 30, 2027; and 2) authorize the City Manager to sign and implement all actions necessary to manage and administer the Agreement. ...................................................................................................................... E-40 5. Pacific Salmon Commission – Southern Fund Grant Acceptance: Ennis Creek Fish Barrier Removal (GG0119) / 1) Accept the Pacific Salmon Commission Southern Fund grant in the amount of $300,000; and 2) authorize the City Manager to execute all grant-related documents, to administer the grant, and to make minor modifications as necessary. ................................................................................................................................................... E-66 6. Stonegarden FY 2025 Grant Agreement with Clallam County / Authorize the City Manager and Police Chief to accept the grant funds and sign the letter of understanding between the City and the Clallam County Sheriff’s Office. .............................................................................................................................................................. E-104 7. Temporary On-Call Professional Engineering Services PSA-2026-41 / 1) Authorize the City Manager to approve and execute a professional services agreement to an appropriate firm as selected by staff through a competitive informal procurement process through utilization of our MRSC Roster in an amount not to exceed $100,000.00, to administer the agreement and to make minor modifications as may be necessary. ...................................... E-167 F. Public Hearings | 6:30 p.m. or Soon Thereafter .......................................................................................... None G. Ordinances Not Requiring Council Public Hearings ............................................................................... None H. Resolutions Not Requiring Council Public Hearings ............................................................................... None I. Other Considerations 1. PA Healthy Youth Coalition / Presentation 2. OlyCAP Dignity Bus / Presentation, Council Discussion and Direction....................................................... I-1 3. Public Defense Interlocal Agreement / Approve and Authorize ..................................................................... I-27 4. No Smoking on City Properties / Council Discussion .................................................................................... I-29 5. Invitation to Joint Meeting with Clallam County, the Port of Port Angeles, and Clallam P.U.D. / Council Discussion and Appoint ................................................................................................................................. I-30 Tuesday October 6, 2026 Port Angeles City Council Meeting Page 3 PUBLIC HEARINGS Public hearings are set by the City Council in order to meet legal requirements. City Council may set a public hearing in ord er to receive public input prior to making decisions which impact citizens. City Council may choose to seek public opinion through the public hearing process. J. Contracts & Purchasing 1. CON-2026-03 Light-Ops Pole Testing 2026-2028 / Award and Authorize .................................................... J-1 2. PSA-2026-33 (TR0220) Traffic Circle Program / Award and Authorize ....................................................... J-3 3. Vehicle Purchase – Light Operations Digger Derrick Vehicle #2552 / Approve and Authorize .................... J-52 K. Council Reports L. Information City Manager Reports: 1. Combined Sewer Overflow Discharge Update / For Information Only ......................................................... L-1 M. Second Public Comment Follow the instructions from the first public comment period. Adjournment City Council Meeting October 6,2026 PUBLIC COMMENT SIGN .UP SHEET I , Are you a City of Port Angeles resident or business owner? Yes or No TopicPrint Name Clearly Yes or C-r,,.-"1,o[",, l"- T;l*+' or g*A*',n- of n/vtr^t"g 4\\ocn Fos\o, (qn)el art a 7n')(r^,fr f"luono Yes or No C^ nJr la r,,a- - h,J. Gnt ttDu* \nlat\"" 6wt'u- or No C ,t ^,A nJ6 u, nfr,( tl-(.r\ANIM ," Yes or No nol tttiVruVc1 - N/t ; ?"^h or No C^Mo-\^^ or No C.. \"\a"''ca- - 9(Q*n \\o*.*-- S'./l^^r' C-^ n rla)6^-t'i <-'--(ttLLt/\/ //LcA /ee{@ or No Yes or 'DAtrA c,a-[a2- t.du\3iCdR\\'lrnSrS6J^ Parolo o Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference given to those who wish to speak to an item on the meeting's agenda. If time remains, the presiding officer will call other individuals wishing to speak, generally in the order in which they have signed in. If time is available, the presiding officer may call for additional unsigned speakers. Persons speaking shall state their name, whether they reside within the City limits, whether they have any other perlinent connection to the City, and whether they are appearing as the representative of an organization. Excerpts: Council Rules of Procedure Section 12 Page I City Council Meeting October 61 2026 PUBLIC CO MMENT SIGN-UP SHEET Are you a City of Port Angeles resident or business owner? Yes or No TopicPrint Name Clearly Vqq ra,,frh,* We );w{C>>c f^-n /w4 f Yes or Yes or No Yes or No Yes or No Yes or No Yes or No Yes or No Yes or No Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference given to those who wish to speak to an item on the meeting's agenda. If time remains, the presiding officer will call other individuals wishing to speak, generally in the order in which they have signed in. If time is available, the presiding officer may call for additional unsigned speakers. Persons speaking shall state their name, whether they reside within the City limits, whether they have any other pertinent connection to the City, and whether they are appearing as the representative of an organtzatron. Excerpts: Council Rules of Procedure Section 12 Page 2 City Council Meeting October 6,2026 PUBLIC COMMENT SIGN .UP SHEET I , Are you a City of Port Angeles resident or business owner? Yes or No TopicPrint Name Clearly Yes or C-r,,.-"1,o[",, l"- T;l*+' or g*A*',n- of n/vtr^t"g 4\\ocn Fos\o, (qn)el art a 7n')(r^,fr f"luono Yes or No C^ nJr la r,,a- - h,J. Gnt ttDu* \nlat\"" 6wt'u- or No C ,t ^,A nJ6 u, nfr,( tl-(.r\ANIM ," Yes or No nol tttiVruVc1 - N/t ; ?"^h or No C^Mo-\^^ or No C.. \"\a"''ca- - 9(Q*n \\o*.*-- S'./l^^r' C-^ n rla)6^-t'i <-'--(ttLLt/\/ //LcA /ee{@ or No Yes or 'DAtrA c,a-[a2- t.du\3iCdR\\'lrnSrS6J^ Parolo o Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference given to those who wish to speak to an item on the meeting's agenda. If time remains, the presiding officer will call other individuals wishing to speak, generally in the order in which they have signed in. If time is available, the presiding officer may call for additional unsigned speakers. Persons speaking shall state their name, whether they reside within the City limits, whether they have any other perlinent connection to the City, and whether they are appearing as the representative of an organization. Excerpts: Council Rules of Procedure Section 12 Page I City Council Meeting October 61 2026 PUBLIC CO MMENT SIGN-UP SHEET Are you a City of Port Angeles resident or business owner? Yes or No TopicPrint Name Clearly Vqq ra,,frh,* We );w{C>>c f^-n /w4 f Yes or Yes or No Yes or No Yes or No Yes or No Yes or No Yes or No Yes or No Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference given to those who wish to speak to an item on the meeting's agenda. If time remains, the presiding officer will call other individuals wishing to speak, generally in the order in which they have signed in. If time is available, the presiding officer may call for additional unsigned speakers. Persons speaking shall state their name, whether they reside within the City limits, whether they have any other pertinent connection to the City, and whether they are appearing as the representative of an organtzatron. Excerpts: Council Rules of Procedure Section 12 Page 2 CITY OF PORT ANGELES CITY COUNCIL Port Angeles, Washington September 15, 2026 This meeting was conducted as a hybrid meeting. SPECIAL MEETING A Special Meeting of the City Council commenced at 4:00 p.m. when a quorum of Council gathered to attend a groundbreaking ceremony at the future site of the Joint Public Safety Facility. The ceremony began at 4:15 p.m. and lasted until 4:45 p.m. At that time, the attending Council members returned to City Hall. Members Present: Mayor Dexter, Council members Hamilton, Hodgson, and Schwab. Members Absent: Deputy Mayor Carr, and Council members Miller and Suggs. Staff Present: City Manager West, Deputy City Manager Goings, Clerk Martinez-Bailey, S. Curtin, J. Toth, S. Craig, C> Geyer, and M. Spencer RULES OF PROCEDURE WORK SESSION At 5:00 p.m., Council met for a Rules of Procedure Work Session. Members Present: Mayor Dexter, Deputy Mayor Carr, Council members Hamilton, Hodgson, Miller, Schwab, and Suggs (attending virtually). Members Absent: None. Staff Present: City Manager West, Deputy City Manager Goings, Attorney Sahandy, Clerk Martinez- Bailey, C. Delikat, B. Smith, S. Carrizosa, D. Sharp, S. Curtin, A. Fountain and M. Young. City Manager Nathan West reminded Council that during the 2025-2026 Strategic Plan update, rewriting the Council Rules of Procedure had been added as a measurement under Strategic Focas Area #2 – Citywide Resource Optimization. He presented slides that spoke to the purpose of the Rules of Procedure, existing rules of procedure, issues and challenges, opportunities for expansion, and questions for City Council: •What parts of the current rules are particularly helpful and effective? •What topics are not addressed in a way that you have found helpful? •On the potential rules, are there any topics you would add or delete? •On the potential rules, do you have feedback about the specific way in which you want any of the topics addressed? Manager West spoke to proposed next steps, including a Draft Rules of Procedure document tentatively planned for Council review and discussion and tentative actions at upcoming Council meetings. During Council discussion, Council members provided their input on the current Rules of Procedure and their suggestions for new items. As Council provided their feedback, staff noted items that were mentioned by a quorum of Council. October 6, 2026 E - 1 PORT ANGELES CITY COUNCIL MEETING – September 15, 2026 Page 2 of 6 ADJOURNMENT Mayor Dexter adjourned the Special Meeting at 6:00 p.m. CALL TO ORDER-REGULAR MEETING Mayor Dexter called the regular meeting of the Port Angeles City Council to order at 6:05 p.m. ROLL CALL Members Present: Mayor Dexter, Deputy Mayor Carr, Council members Hamilton, Hodgson, Miller, Schwab, and Suggs (attending virtually). Members Absent: None. Staff Present: City Manager West, Deputy City Manager Goings, Attorney Sahandy, Clerk Martinez- Bailey, C. Delikat, B. Smith, S. Carrizosa, D. Sharp, S. Curtin, A. Fountain and M. Young. PLEDGE OF ALLEGIANCE Mayor led the Pledge of Allegiance to the Flag. LATE ITEMS TO BE PLACED ON THIS OR FUTURE AGENDAS Council member Miller asked Council to consider a discussion on an ordinance related to smoking and vaping on City property to a future agenda. Hearing no objections, the Mayor noted the matter would appear on a future agenda. PUBLIC COMMENT Tim Dalten, County resident and Clallam County Housing and Grant Resource Director, spoke to the Clallam County Homelessness Task Force Overview and Recommendations. Jenny Oppelt, city resident and Clallam County Deputy Director of Health & Human Services, spoke to the Clallam County Homelessness Task Force Overview and Recommendations. CONSENT AGENDA At the request of Council member Schwab, and after hearing no objections, the Mayor added J-2 Addition of Enterprise Asset Management to the Enterprise Resource Planning System to the Consent Agenda. It was moved by Hamilton and seconded by Hodgson to approve the Consent Agenda to include: 1.Minutes from September 1, 2026 / Approve 2.Expenditure Report: Between August 22, 2026 and September 4, 2026 in the Amount of $1,426,363.20 / Approve 3.Neighborhood Sewer Rehabilitation (WW0918) CON-2025-08 – Final Acceptance / 1) Accept the Sanitary Sewer Rehabilitation contract, CON-2025-08, as complete, 2) and authorize staff to proceed with project closeout and release the 5% retainage upon receipt of all required clearances. 4.Paramedic Backfill Interlocal Agreement with Clallam 2 Fire Rescue / 1) Approve the Paramedic Backfill Interlocal Agreement between the City of Port Angeles and Clallam County Fire District #2, and 2) authorize the City Manager to sign the agreement and make minor modifications as necessary. 5.Resolution Ratifying a Declaration of Emergency – Water Main Repair / Pass the attached resolution, affirming and ratifying the Declaration of Emergency issued by the City Manager on September 3, 2026.Passed Resolution # 13-26 6.ADDED TO CONSENT AGENDA / J-2 Addition of Enterprise Asset Management to the Enterprise Resource Planning System / Authorize the addition of the Enterprise Asset Management (EAM) module, conversion of data and implementation costs to the current ERP implementation October 6, 2026 E - 2 PORT ANGELES CITY COUNCIL MEETING – September 15, 2026 Page 3 of 6 with Tyler Technologies in an amount not to exceed $263,953.00 including taxes, and authorize the City Manager to sign all necessary documents and to make minor modifications as necessary. Motion carried 7-0. RESOLUTIONS NOT REQUIRING COUNCIL PUBLIC HEARINGS 1.Resolution Amending the City’s Utility Master Fee Schedule for Solid Waste Disposal Fees Public Works & Utilities Director Scott Curtin noted a scrivener’s error on the draft fee schedule and then clarified in the Council Packet and spoke to some of the changes in the amendment. Mayor Dexter read the resolution by title, entitled, RESOLUTION NO. 14-26 A RESOLUTION of the City Council of the City of Port Angeles, Washington, amending in part the City of Port Angeles Utility Master Fee Schedule for Solid Waste Disposal Rates for uncommon materials. It was moved by Carr and seconded by Hamilton to: Pass the resolution amending in part the City of Port Angeles Utility Master Fee Schedule for Solid Waste Disposal Rates for uncommon materials. Motion carried 7-0. CONTRACTS & PURCHASING 1.Prosecution Services Interlocal Agreement Manager West presented the agenda item, provided background on the matter, and pointed out the changes made to the contract appeared in the packet as underline and strike through notations. It was moved by Miller and seconded by Carr to: Approve the Prosecution Interlocal between the City of Port Angeles, Clallam County, and Clallam County Prosecuting Attorney’s Office, and authorize the City Manager to sign the agreement and make such minor changes as deemed necessary to affect the intent of this authorization. Motion carried 7-0. PUBLIC HEARINGS 1.Public Hearing for Prior Data Center Moratorium Action Manager West presented the agenda item, provided background on the matter, spoke to the 6-month moratorium, reiterated there were no existing applications, added that the moratorium allows for the opportunity to take the time to review our Port Angeles municipal code, to review those elements relative to land use relative to utilities. He stated it was intended to have public opportunities in both the Utility Advisory Committee and the Planning commission to consider both the utility related issues and land use issues. He reiterated that as a part of a state statute the moratorium required a public hearing to be held to obtain public testimony and feedback relative to the adopted moratorium. At 6:36 p.m. the Mayor opened the public hearing. Cherie Kidd, city resident, spoke to the importance of a moratorium and the opportunities a data center could bring to Port Angeles. Daniel England, city resident, spoke in opposition of allowing data centers in Port Angeles. October 6, 2026 E - 3 PORT ANGELES CITY COUNCIL MEETING – September 15, 2026 Page 4 of 6 Paul Jarkiewicz, Port of Port Angeles Chief Executive Officer and city resident, spoke to the opportunities a data center could bring to Port Angeles and suggested a workshop to understand what was intended to happen at the McKinley property. Kelly Kidwell, Port of Port Angeles and business owner, spoke to the opportunities a data center could bring to Port Angeles and suggested a workshop to understand what was intended to happen at the McKinley property. Colleen McAleer, speaking on behalf of Clallam County Economic Development Council, county resident, suggested Council limit certain aspects of data center and spoke to the opportunities a data center could bring to Port Angeles Tracy Able, city resident, spoke in opposition of allowing data centers in Port Angeles. Steven Pelayo, county resident, suggested the Council consider the potential opportunities before they make any decision to outright deny data centers. Roy Mann, county resident, asked the Council to consider what types of data centers might work and that the City should consider water and power use and noise mitigation when reviewing code. The Mayor closed the public hearing. Council discussion followed. The Mayor recessed the meeting for a break at 7:10 p.m. The meeting reconvened at 7:15 p.m. OTHER CONSIDERATIONS 1.Clallam County Homelessness Task Force Overview and Recommendations Deputy City Manager Goings introduced the matter, provided Strategic Plan alignment background and introduced Housing Administrator Jalyn Boado who spoke to the presentation Council was about to receive. She then spoke to Council action taken, spoke to laws that control Homelessness Funding, Sales and Use Tax Grants for Affordable Housing, action taken by the Clallam County Homelessness Task Force, spoke to action taken by other Washington organizations, and provided two recommendations for Co-Governance, first Option A – Operate within the existing Homelessness Task Force systems and Option B – Create a joint housing funding board modeled after the Jefferson County Model. Option B could be more costly and time-consuming. Council discussion followed. It was moved by Schwab and seconded by Hamilton to: Approve Option A and authorize the Mayor to send the proposed letter, with direction that discussions seek provisions providing City representatives timely access to information necessary for funding review and program evaluation, and City participation in establishing outcome-based performance measures, evaluating results, and recommending corrective action. Council discussion followed. It was moved by Suggs and seconded by Miller to: Table the motion and direct staff to work with three council members to set up a meeting with Clallam County. Motion carried 5-2 with Carr and Hamilton opposed. Manager West asked for clarification on the expectations for the meeting. Council agreed by consensus to include a single Commissioner rather than the full Board. Council discussion followed. October 6, 2026 E - 4 PORT ANGELES CITY COUNCIL MEETING – September 15, 2026 It was moved by Dexter and seconded by Hodgson to: Direct staff to work with Hamilton, Miller and Hodgson, as the designated members on the County subcommittee. Motion carried 7-0. 2. Letter Opposing the Proposed Repeal of the National Forest Roadless Rule Mayor Dexter presented the agenda item then provided background on the matter. Council discussion followed. It was moved by Carr and seconded by Hodgson to: Authorize the Mayor to sign on to the joint letter from a coalition of Washington stakeholders opposing the repeal of the 2001 National Forest Roadless Rule. It was moved by Hamilton and seconded by Carr to amend the motion to state: Add, and authorize the Mayor to write to the City’s federal delegation with Port Angeles specific details about the City’s opposition of the 2001 National Forest Roadless Rule. Motion to amend carried 7-0. The Mayor re-stated the final motion before Council: Authorize the Mayor to sign on to the joint letter from a coalition of Washington stakeholders opposing the repeal of the 2001 National Forest Roadless Rule authorize the Mayor to write to the City’s federal delegation with Port Angeles specific details about the City’s opposition of the 2001 National Forest Roadless Rule. Consideration of the final motion 7-0. CITY COUNCIL REPORTS Council member Suggs spoke about attendance at a Marine Resources Committee meeting. Council member Hodgson said he attended a Coast Guard all-hands meeting, attendance at a Habitat for Humanity ribbon cutting event and a Chamber of Commerce luncheon. He expressed interest in attending the National League of Cities conference in Nashville, Tennessee, and stated he intended to cover his own expenses given the limited Council travel budget. Council member Schwab said he attended the Olympic Peninsula Tourism Commission meeting, a Chamber of Commerce luncheon, and an Elevate PA meeting. Deputy Mayor Carr spoke about attendance at a Utility Advisory Committee meeting. Council member Miller expressed appreciation for Suggs attendance as her alternate in her absence and said she will spend time reviewing meetings she missed. Council member Hamilton spoke about resuming his work as a Port Angeles High School teacher after summer break, recognizing there were students in the audience he expressed his appreciation for fellow teacher Stacey Sanders who encourages students to attend public meetings, spoke about his attendance at a recent Utility Advisory Committee meeting, and proposed the idea of a quarterly subcommittee meeting with members of the Lower Elwha Klallam Tribe. Mayor Dexter attendance at a recent Lodging Tax Advisory Committee meeting, a KONP interview where she was able to share information on both the moratorium public hearing and the Joint Public groundbreaking event, Page 5 of 6 October 6, 2026 E - 5 PORT ANGELES CITY COUNCIL MEETING – September 15, 2026 Page 6 of 6 No other reports were given. INFORMATION Manager West reminded Council of an upcoming work session where two agreements would be considered, modeled after the prosecution document approved earlier in the meeting. He noted a number of reports in the packet and expressed his appreciation for staff’s work to put the reports together. SECOND PUBLIC COMMENT Ileana Murphy Haggardy, city resident, spoke about Senior Center matters, senior advocacy, and policies. Janette Winty, city resident, spoke about Senior Center matters, senior advocacy, and policies. Donna Peterson, city resident, spoke about Senior Center matters, senior advocacy, and policies. Cherie Kidd, city resident, spoke about the groundbreaking event for the Joint Public Safety Facility meeting that took place earlier that day. Gayle Brauner, city resident, spoke to warning signs and threats of domestic terrorism in the Port Angeles community, and provided Council with paper copies of her comments which included a list of informational resources. Steve Pelayo, county residents, spoke about data centers and their potential effect on the community and asked that Council focus on Economic development. ADJOURNMENT There being no further business to come before the Council, the Mayor adjourned the meeting at 8:57 p.m. _____________________________________ _______________________________ Kate Dexter, Mayor Kari Martinez-Bailey, City Clerk Minutes were approved on: October 6, 2026 E - 6 PORTANGELES FINANCE Si;;;;; WASHtNGroN , U . S . DEPARTMENT October 6, 2026 We,the undersigned City Officials of the City of Port Angeles, do hereby certify that the merchandise and/or services herein specified have been received and that these claims are approved for payment in the amount of$4,448,734.51 this 6th day of October, 2026. Mayor City Manager "Where the mountains meet the sea" 360.457.04111finanCe@cityofpo.us www.cityofpa.us 321 E.5th Street,Port Angeles,WA 98362 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 001-0000-237.00-00 979.85 MISC DEPOSIT & PERMIT REFUNDS REFUND-SALES TAX 001-0000-237.30-00 402.34 PLAY BY DESIGN PARK,PLAYGROUND,REC EQUIP 001-0000-237.00-00 (106.23) US BANK CORPORATE PAYMENT SYSTEM CITY CREDIT CARD 001-0000-213.10-95 38,933.56 WA STATE PATROL AUGUST 2026 FINGERPRINTS 001-0000-229.50-00 60.00 WASHINGTON (DOL), STATE OF AUGUST 2026 CPLS 001-0000-229.60-00 312.00 Division Total:$40,581.52 Department Total:$40,581.52 LEMAY MOBILE SHREDDING OFFICE MACHINES & ACCESS 001-1210-513.41-50 410.75 PACIFIC OFFICE EQUIPMENT INC SUPPLIES 001-1210-513.31-01 18.51 SUPPLIES 001-1210-513.31-01 203.07 City Manager Division Total:$632.33 MISC TRAVEL L INGRAHAM-AWC BENEFIT FO 001-1220-516.43-10 176.00 Human Resources Division Total:$176.00 CIVICPLUS COMMUNICATIONS/MEDIA SERV 001-1230-514.41-50 4,094.24 SOUND PUBLISHING INC COMMUNICATIONS/MEDIA SERV 001-1230-514.44-10 42.66 COMMUNICATIONS/MEDIA SERV 001-1230-514.44-10 93.22 COMMUNICATIONS/MEDIA SERV 001-1230-514.44-10 29.28 City Clerk Division Total:$4,259.40 City Manager Department Total:$5,067.73 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 001-2023-514.44-50 9.73 OLYMPIC PRINTERS INC PAPER (OFFICE,PRINT SHOP) 001-2023-514.31-01 395.31 PACIFIC OFFICE EQUIPMENT INC COMPUTER ACCESSORIES&SUPP 001-2023-514.31-01 313.26 SHI INTERNATIONAL CORP COMPUTERS,DP & WORD PROC. 001-2023-514.48-02 25.12 WASHINGTON (AUDITOR), STATE OF FINANCIAL SERVICES 001-2023-514.41-50 11,570.20 Accounting Division Total:$12,313.62 DATABAR INCORPORATED MISC PROFESSIONAL SERVICE 001-2025-514.41-50 3,192.85 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 3,332.89 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,705.93 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 3,125.92 EQUIFAX FINANCIAL SERVICES 001-2025-514.41-50 84.94 FINANCIAL SERVICES 001-2025-514.41-50 392.04 FINANCIAL SERVICES 001-2025-514.41-50 (226.86) Page 1 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 7 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount LEXISNEXIS FINANCIAL SERVICES 001-2025-514.41-50 217.80 OLYMPIC PRINTERS INC PAPER (OFFICE,PRINT SHOP) 001-2025-514.31-01 413.82 OLYMPIC STATIONERS INC PRINTING,SILK SCR,TYPSET 001-2025-514.31-01 213.44 Customer Service Division Total:$13,452.77 OLYMPIC PRINTERS INC ENVELOPES, PLAIN, PRINTED 001-2070-518.31-01 745.97 ENVELOPES, PLAIN, PRINTED 001-2070-518.31-01 1,116.23 Reprographics Division Total:$1,862.20 Finance Department Total:$27,628.59 CLALLAM CNTY COMMISSIONER'S OFFICE SUPPLIES 001-3012-598.51-23 150,569.95 Jail Contributions Division Total:$150,569.95 MISC EMPLOYEE EXPENSE REIMBURSEMENT RELOCATION REIMB. 001-3030-515.43-10 5,853.13 City Attorney Division Total:$5,853.13 City Attorney Department Total:$156,423.08 BAILEY SIGNS & GRAPHICS SIGNS, SIGN MATERIAL 001-4050-558.45-21 490.05 TSYS MERCHANT SOLUTIONS CONSULTING SERVICES 001-4050-558.41-50 50.00 Building Division Total:$540.05 AKS ENGINEERING & FORESTRY CONSULTING SERVICES 001-4060-558.41-50 1,328.75 CONSULTING SERVICES 001-4060-558.41-50 13,206.25 SOUND PUBLISHING INC COMMUNICATIONS/MEDIA SERV 001-4060-558.41-15 90.06 COMMUNICATIONS/MEDIA SERV 001-4060-558.41-15 96.38 Planning Division Total:$14,721.44 LAMINAR LAW PLLC MISC PROFESSIONAL SERVICE 001-4071-558.41-50 825.00 MISC TRAVEL S CARTMEL-WA PLANNING DIR 001-4071-558.43-10 153.00 Economic Development Division Total:$978.00 Community Development Department Total:$16,239.49 GALLS CLOTHING & APPAREL 001-5010-521.31-11 74.59 LEXISNEXIS LIBRARY SERVICES(EXCL 908 001-5010-521.49-01 54.45 Police Administration Division Total:$129.04 MISC EMPLOYEE EXPENSE REIMBURSEMENT TUITION REIMBURSEMENT 75% 001-5021-521.43-10 937.50 MISC TRAVEL J HOOPER-SWAT BASIC ACADE 001-5021-521.43-10 622.84 K MALONE-OHIA MAJOR CRIME 001-5021-521.43-10 252.66 R CAMERON-OHIA MAJOR CRIM 001-5021-521.43-10 172.00 T DROPP-OHIA MAJOR CRIMES 001-5021-521.43-10 176.75 Page 2 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 8 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount Investigation Division Total:$2,161.75 CRIMINAL JUSTICE TRAINING COMM HUMAN SERVICES 001-5022-521.43-10 2,608.80 CURTIS & SONS INC, L N CLOTHING & APPAREL 001-5022-521.31-11 82.55 CLOTHING & APPAREL 001-5022-521.31-11 198.70 CLOTHING & APPAREL 001-5022-521.31-11 366.00 CLOTHING & APPAREL 001-5022-521.31-11 193.85 CLOTHING & APPAREL 001-5022-521.31-11 171.38 CLOTHING & APPAREL 001-5022-521.31-11 55.65 CLOTHING & APPAREL 001-5022-521.31-11 547.26 CLOTHING & APPAREL 001-5022-521.31-11 2,070.12 POLICE EQUIPMENT & SUPPLY 001-5022-521.31-11 900.05 CLOTHING & APPAREL 001-5022-521.31-11 20.20 CLOTHING & APPAREL 001-5022-521.31-11 937.60 DUNGENESS RANCH PET RESORT MISCELLANEOUS SERVICES 001-5022-521.49-80 262.50 LINCOLN STREET STATION SHIPPING AND HANDLING 001-5022-521.42-10 76.86 SHIPPING AND HANDLING 001-5022-521.42-10 17.72 SHIPPING AND HANDLING 001-5022-521.42-10 77.28 SHIPPING AND HANDLING 001-5022-521.42-10 16.69 SHIPPING AND HANDLING 001-5022-521.42-10 131.90 SHIPPING AND HANDLING 001-5022-521.42-10 93.53 SHIPPING AND HANDLING 001-5022-521.42-10 189.74 MISC EMPLOYEE EXPENSE REIMBURSEMENT REIMBURSEMENT VACCINE FBI 001-5022-521.43-10 240.00 MISC TRAVEL Z MOORE-SWAT BASIC ACADEM 001-5022-521.43-10 976.34 D MILLER-WACE FALL CONF 2 001-5022-521.43-10 321.00 K PERRY-SWAT BASIC ACADEM 001-5022-521.43-10 494.50 L EMERY-WSPCA K9 SEMINAR 001-5022-521.43-10 265.89 OLYMPIC MEDICAL CENTER HEALTH RELATED SERVICES 001-5022-521.49-90 520.00 PACIFIC OFFICE EQUIPMENT INC PAPER (OFFICE,PRINT SHOP) 001-5022-521.31-01 282.36 QUILL CORPORATION OFFICE SUPPLIES, GENERAL 001-5022-521.31-01 27.83 SWAIN'S GENERAL STORE INC OFFICE SUPPLIES, GENERAL 001-5022-521.31-01 34.87 AUTO SHOP EQUIPMENT & SUP 001-5022-521.31-01 13.98 METALS,BARS,PLATES,RODS 001-5022-521.31-01 6.98 METALS,BARS,PLATES,RODS 001-5022-521.31-01 3.23 Page 3 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 9 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount SWAIN'S GENERAL STORE INC METALS,BARS,PLATES,RODS 001-5022-521.31-01 3.23 SYMBOLARTS, LLC POLICE EQUIPMENT & SUPPLY 001-5022-521.31-11 89.84 VIKING SEW & VAC MISCELLANEOUS SERVICES 001-5022-521.31-11 13.06 Patrol Division Total:$12,311.49 CALIBRE PRESS INC HUMAN SERVICES 001-5029-521.43-10 359.00 PACIFIC OFFICE EQUIPMENT INC PAPER (OFFICE,PRINT SHOP) 001-5029-521.31-01 282.37 Records Division Total:$641.37 Police Department Total:$15,243.65 AP TRITON CONSULTING SERVICES 001-6010-522.41-15 212.59 GLOBALSTAR USA 08-16 A/C AC00153767 001-6010-522.42-10 105.01 LEMAY MOBILE SHREDDING OFFICE MACHINES & ACCESS 001-6010-522.41-50 102.70 Fire Administration Division Total:$420.30 CURTIS & SONS INC, L N CLOTHING & APPAREL 001-6020-522.31-11 1,082.31 CLOTHING & APPAREL 001-6020-522.20-80 859.42 FIRE PROTECTION EQUIP/SUP 001-6020-522.31-02 341.86 MISC PROFESSIONAL SERVICE 001-6020-522.35-01 2,374.67 GALLS CLOTHING & APPAREL 001-6020-522.20-80 201.69 JIFFY CLEANERS LAUNDRY/DRY CLEANING SERV 001-6020-522.20-80 92.57 MISC ONE-TIME VENDORS INSURANCE, ALL TYPES 001-6020-522.20-20 279.44 INSURANCE, ALL TYPES 001-6020-522.20-20 2,838.01 NORTHWEST SAFETY CLEAN CLOTHING & APPAREL 001-6020-522.31-11 2,076.08 CLOTHING & APPAREL 001-6020-522.31-11 835.75 CLOTHING & APPAREL 001-6020-522.31-11 153.71 SEAWESTERN INC SHOES AND BOOTS 001-6020-522.20-80 567.18 SHIELD ASSESSMENTS HEALTH RELATED SERVICES 001-6020-522.41-50 465.00 SWAIN'S GENERAL STORE INC HAND TOOLS ,POW&NON POWER 001-6020-522.31-01 21.75 AUTO SHOP EQUIPMENT & SUP 001-6020-522.31-01 10.82 Fire Suppression Division Total:$12,200.26 JIFFY CLEANERS LAUNDRY/DRY CLEANING SERV 001-6030-522.20-80 5.45 LAUNDRY/DRY CLEANING SERV 001-6030-522.20-80 23.96 PACIFIC OFFICE EQUIPMENT INC OFFICE SUPPLY,INKS,LEADS 001-6030-522.31-01 88.60 OFFICE SUPPLY,INKS,LEADS 001-6030-522.31-01 88.60 Fire Prevention Division Total:$206.61 BLUE CARD COMMAND SCHOOL EQUIP& SUPPLIES 001-6045-522.43-10 3,080.00 Fire Training Division Total:$3,080.00 Page 4 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 10 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount A-1 PERFORMANCE, INC BUILDING MAINT&REPAIR SER 001-6050-522.41-50 438.60 ANGELES MILLWORK & LUMBER HARDWARE,AND ALLIED ITEMS 001-6050-522.48-10 34.30 HARTNAGEL BUILDING SUPPLY INC BUILDING MAINT&REPAIR SER 001-6050-522.48-10 1,472.58 PORT ANGELES POWER EQUIPMENT PUMPS & ACCESSORIES 001-6050-522.31-20 71.57 SWAIN'S GENERAL STORE INC SALE SURPLUS/OBSOLETE 001-6050-522.48-10 2.98 THURMAN SUPPLY FIRE PROTECTION EQUIP/SUP 001-6050-522.48-10 22.05 WALTER E NELSON CO EQUIP MAINT & REPAIR SERV 001-6050-522.31-01 236.03 Facilities Maintenance Division Total:$2,278.11 Fire Department Total:$18,185.28 APWA WASHINGTON STATE CHAPTER MCINTYRE 001-7012-532.43-10 2,000.00 BUILDERS EXCHANGE OF WA INC CONSTRUCTION SERVICES,HEA 001-7012-532.44-10 49.01 KARRAS CONSULTING MISC PROFESSIONAL SERVICE 001-7012-532.41-50 7,500.00 MISC EMPLOYEE EXPENSE REIMBURSEMENT LODGING - M. ZUKOWSKI 001-7012-532.41-50 3,184.80 MISC ONE-TIME VENDORS LODGING - M. ZUKOWSKI 001-7012-532.41-50 961.50 LODGING - M. ZUKOWSKI 001-7012-532.41-50 2,101.55 OLYMPIC PRINTERS INC PRINTING,SILK SCR,TYPSET 001-7012-532.31-01 229.78 PROTHMAN COMPANY CONSULTING SERVICES 001-7012-532.41-50 4,893.79 SHI INTERNATIONAL CORP COMPUTERS,DP & WORD PROC. 001-7012-532.48-02 753.86 Engineering & CIP Division Total:$21,674.29 Public Works & Utilities Department Total:$21,674.29 AMAZON CAPITAL SERVICES SUPPLIES 001-8010-574.31-01 39.30 SUPPLIES 001-8010-574.31-01 59.54 Parks Administration Division Total:$98.84 MISC TRAVEL C GEYER-WFOA PRESENTOR-HO 001-8012-555.43-10 463.90 Senior Center Division Total:$463.90 AMAZON CAPITAL SERVICES SUPPLIES 001-8050-536.31-20 52.72 ANGELES MILLWORK & LUMBER HARDWARE,AND ALLIED ITEMS 001-8050-536.31-20 88.02 LUMBER& RELATED PRODUCTS 001-8050-536.31-20 275.60 LUMBER& RELATED PRODUCTS 001-8050-536.31-20 17.21 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 001-8050-536.44-50 580.68 MATTHEWS INTERNATIONAL MARKERS, PLAQUES,SIGNS 001-8050-536.34-01 530.36 MISC DEPOSIT & PERMIT REFUNDS REFUND-CONCRETE VAULT (UR 001-8050-343.60-16 240.00 REFUND-SLANT/COLLAR/INSTA 001-8050-343.60-13 4,332.00 Page 5 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 11 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount MISC DEPOSIT & PERMIT REFUNDS REFUND-URN/VAULT/SERVICE 001-8050-343.60-14 1,350.00 QUIRING MONUMENTS INC MARKERS, PLAQUES,SIGNS 001-8050-536.34-01 315.00 MARKERS, PLAQUES,SIGNS 001-8050-536.34-01 450.00 MARKERS, PLAQUES,SIGNS 001-8050-536.34-01 1,065.00 MARKERS, PLAQUES,SIGNS 001-8050-536.34-01 1,115.00 SWAIN'S GENERAL STORE INC SUPPLIES 001-8050-536.31-20 38.02 Ocean View Cemetery Division Total:$10,449.61 ALLPLAY SYSTEMS, LLC PARK,PLAYGROUND,REC EQUIP 001-8080-576.31-20 2,792.33 AMAZON CAPITAL SERVICES ROADSIDE,GRNDS,REC, PARK 001-8080-576.31-20 186.83 SUPPLIES 001-8080-576.31-01 10.98 SUPPLIES 001-8080-576.31-01 69.32 SUPPLIES 001-8080-576.31-01 94.96 SUPPLIES 001-8080-576.31-20 11.21 SUPPLIES 001-8080-576.31-20 58.17 SUPPLIES 001-8080-576.35-01 340.70 ANGELES CONCRETE PRODUCTS ROAD/HWY MAT NONASPHALTIC 001-8080-576.31-40 66.25 SPORTING & ATHLETIC EQUIP 001-8080-576.31-40 1,246.73 ROAD/HWY MAT NONASPHALTIC 001-8080-576.31-40 1,280.39 ROAD/HWY MAT NONASPHALTIC 001-8080-576.31-40 92.96 ROAD/HWY MAT NONASPHALTIC 001-8080-576.31-40 114.25 ANGELES MILLWORK & LUMBER PAINTING EQUIPMENT & ACC 001-8080-576.31-20 41.55 CENTRAL WELDING SUPPLY SUPPLIES 001-8080-576.49-90 42.22 EAST SIDE LANDSCAPING SUPPLY SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 81.45 FAMILY SHOE STORE FIRST AID & SAFETY EQUIP.001-8080-576.31-01 277.64 FERGUSON ENTERPRISES INC PLUMBING EQUIP FIXT,SUPP 001-8080-576.31-20 89.64 PLUMBING EQUIP FIXT,SUPP 001-8080-576.31-20 577.36 GOODMAN SANITATION BUILDING, FABRICATED 001-8080-576.48-10 226.44 GRAINGER HARDWARE,AND ALLIED ITEMS 001-8080-576.31-20 26.75 HARTNAGEL BUILDING SUPPLY INC PAINTING EQUIPMENT & ACC 001-8080-576.31-20 51.19 HAULAWAY STORAGE SUPPLIES 001-8080-576.45-30 (203.44) SUPPLIES 001-8080-576.45-30 203.44 MISCELLANEOUS SERVICES 001-8080-576.45-30 206.23 SUPPLIES 001-8080-576.45-30 202.10 SUPPLIES 001-8080-576.45-30 202.10 Page 6 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 12 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount HAULAWAY STORAGE SUPPLIES 001-8080-576.45-30 202.10 SUPPLIES 001-8080-576.45-30 203.44 HEARTLINE SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 98.01 SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 245.03 SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 392.04 SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 245.03 SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 139.39 SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 343.04 NAPA AUTO PARTS FUEL,OIL,GREASE, & LUBES 001-8080-576.31-01 145.16 PACIFIC OFFICE EQUIPMENT INC SUPPLIES 001-8080-576.31-01 694.46 PLAY BY DESIGN PARK,PLAYGROUND,REC EQUIP 001-8080-576.31-20 288.97 PARK,PLAYGROUND,REC EQUIP 001-8080-576.31-20 1,010.87 PORT ANGELES POWER EQUIPMENT SUPPLIES 001-8080-576.31-20 84.65 PORT OF PORT ANGELES SUPPLIES 001-8080-576.45-30 7,142.67 RAINBOW SWEEPERS, INC RENTAL/LEASE EQUIPMENT 001-8080-576.48-10 1,486.49 SMALL ENGINE CLINIC, INC LAWN MAINTENANCE EQUIP 001-8080-576.31-01 784.01 SWAIN'S GENERAL STORE INC JANITORIAL SUPPLIES 001-8080-576.31-20 117.48 FIRST AID & SAFETY EQUIP.001-8080-576.31-01 161.06 SUPPLIES 001-8080-576.31-20 35.90 PAINTING EQUIPMENT & ACC 001-8080-576.31-20 82.63 HARDWARE,AND ALLIED ITEMS 001-8080-576.31-20 52.99 FUEL,OIL,GREASE, & LUBES 001-8080-576.31-20 19.44 TAPE(NOT DP,SOUND,VIDEO) 001-8080-576.31-20 7.78 FIRST AID & SAFETY EQUIP.001-8080-576.31-20 52.87 PAINTING EQUIPMENT & ACC 001-8080-576.31-20 40.18 SUPPLIES 001-8080-576.31-20 56.50 HARDWARE,AND ALLIED ITEMS 001-8080-576.31-01 28.14 JANITORIAL SUPPLIES 001-8080-576.31-20 101.70 THURMAN SUPPLY PLUMBING EQUIP FIXT,SUPP 001-8080-576.31-20 25.03 PLUMBING EQUIP FIXT,SUPP 001-8080-576.31-20 20.43 ELECTRONIC COMPONENTS 001-8080-576.31-20 23.53 Parks Facilities Division Total:$22,720.77 Parks & Recreation Department Total:$33,733.12 ANGELES MILLWORK & LUMBER HARDWARE,AND ALLIED ITEMS 001-8112-555.31-20 8.83 Page 7 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 13 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount ANGELES MILLWORK & LUMBER METALS,BARS,PLATES,RODS 001-8112-555.31-20 16.50 HARDWARE,AND ALLIED ITEMS 001-8112-555.31-20 11.92 COMMERCIAL REPAIR MISCELLANEOUS SERVICES 001-8112-555.48-10 179.68 MISCELLANEOUS SERVICES 001-8112-555.48-10 631.56 GRAINGER MARKERS, PLAQUES,SIGNS 001-8112-555.31-20 195.11 ELECTRICAL EQUIP & SUPPLY 001-8112-555.31-20 164.00 RAINBOW SWEEPERS, INC RENTAL/LEASE EQUIPMENT 001-8112-555.31-20 81.68 SWAIN'S GENERAL STORE INC HARDWARE,AND ALLIED ITEMS 001-8112-555.31-20 33.50 Senior Center Facilities Division Total:$1,322.78 AMAZON CAPITAL SERVICES JANITORIAL SUPPLIES 001-8131-518.31-20 41.33 SUPPLIES 001-8131-518.31-20 26.64 ANGELES MILLWORK & LUMBER PAINTING EQUIPMENT & ACC 001-8131-518.31-20 231.54 TAPE(NOT DP,SOUND,VIDEO) 001-8131-518.31-20 47.82 PAINTING EQUIPMENT & ACC 001-8131-518.31-20 37.35 PAINTING EQUIPMENT & ACC 001-8131-518.31-20 292.13 TAPE(NOT DP,SOUND,VIDEO) 001-8131-518.31-20 55.62 PAINTING EQUIPMENT & ACC 001-8131-518.31-20 52.49 SUPPLIES 001-8131-518.31-20 19.63 PAINTING EQUIPMENT & ACC 001-8131-518.31-20 16.62 SUPPLIES 001-8131-518.31-20 47.98 CED/CONSOLIDATED ELEC DIST ELECTRICAL EQUIP & SUPPLY 001-8131-518.31-20 85.86 ELECTRICAL EQUIP & SUPPLY 001-8131-518.31-20 164.75 ELECTRICAL EQUIP & SUPPLY 001-8131-518.31-20 1,710.33 DAVE'S HEATING & COOLING SVC MISCELLANEOUS SERVICES 001-8131-518.48-10 5,140.08 GRAINGER PLUMBING EQUIP FIXT,SUPP 001-8131-518.31-20 354.38 HD SUPPLY JANITORIAL SUPPLIES 001-8131-518.31-20 145.01 SUPPLIES 001-8131-518.31-20 210.72 SWAIN'S GENERAL STORE INC HAND TOOLS ,POW&NON POWER 001-8131-518.31-20 24.51 HARDWARE,AND ALLIED ITEMS 001-8131-518.31-20 47.35 PLUMBING EQUIP FIXT,SUPP 001-8131-518.31-20 13.66 ROAD/HWY MAT NONASPHALTIC 001-8131-518.31-20 30.33 PAINTING EQUIPMENT & ACC 001-8131-518.31-20 23.89 PAINTING EQUIPMENT & ACC 001-8131-518.31-20 48.31 JANITORIAL SUPPLIES 001-8131-518.31-01 98.27 Page 8 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 14 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount THURMAN SUPPLY PLUMBING EQUIP FIXT,SUPP 001-8131-518.31-20 38.12 Central Svcs Facilities Division Total:$9,004.72 AMAZON CAPITAL SERVICES ELECTRICAL EQUIP & SUPPLY 001-8155-575.31-20 597.86 Facility Rentals Division Total:$597.86 Facilities Maintenance Department Total:$10,925.36 DEPT OF NATURAL RESOURCES CONSULTING SERVICES 001-9029-518.41-50 1,548.56 General Unspecified Division Total:$1,548.56 Non-Departmental Department Total:$1,548.56 General Fund Fund Total:$347,250.67 CONCERTS ON THE PIER MISC PROFESSIONAL SERVICE 101-1430-557.41-50 10,500.00 FEIRO MARINE LIFE CENTER MISC PROFESSIONAL SERVICE 101-1430-557.41-50 2,100.00 GOPA LLC MISCELLANEOUS SERVICES 101-1430-557.41-50 15,000.00 JUAN DE FUCA FOUNDATION MISC PROFESSIONAL SERVICE 101-1430-557.41-50 24,825.00 PORT ANGELES CHAMBER OF COMM MISC PROFESSIONAL SERVICE 101-1430-557.41-50 15,586.80 MISC PROFESSIONAL SERVICE 101-1430-557.41-50 19,626.80 PORT ANGELES SALMON CLUB MISCELLANEOUS SERVICES 101-1430-557.41-50 10,000.00 WANDER FUCA LLC MISC PROFESSIONAL SERVICE 101-1430-557.41-50 16,400.00 MISC PROFESSIONAL SERVICE 101-1430-557.41-50 16,875.00 MISC PROFESSIONAL SERVICE 101-1430-557.41-50 (16,875.00) MISC PROFESSIONAL SERVICE 101-1430-557.41-50 (16,400.00) MISC PROFESSIONAL SERVICE 101-1430-557.41-50 16,400.00 MISC PROFESSIONAL SERVICE 101-1430-557.41-50 16,875.00 Lodging Excise Tax Division Total:$130,913.60 Lodging Excise Tax Department Total:$130,913.60 Lodging Excise Tax Fund Total:$130,913.60 A-1 PERFORMANCE, INC BUILDING MAINT&REPAIR SER 102-7230-542.41-50 152.68 AMAZON CAPITAL SERVICES FLAGS,POLES,BANNERS,ACCES 102-7230-542.31-01 47.90 ANGELES CONCRETE PRODUCTS BUILDER'S SUPPLIES 102-7230-542.31-20 1,032.79 BUILDER'S SUPPLIES 102-7230-542.31-20 614.13 ANGELES MILLWORK & LUMBER LUMBER& RELATED PRODUCTS 102-7230-542.31-20 105.63 EPOXY BASED FORMULAS 102-7230-542.31-01 211.15 EPOXY BASED FORMULAS 102-7230-542.31-20 (99.06) HAND TOOLS ,POW&NON POWER 102-7230-542.31-20 24.95 TAPE(NOT DP,SOUND,VIDEO) 102-7230-542.31-25 73.79 ROAD/HWY MAT NONASPHALTIC 102-7230-542.31-20 86.76 Page 9 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 15 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount ANGELES MILLWORK & LUMBER LUMBER& RELATED PRODUCTS 102-7230-542.31-20 109.31 BUCK'S NORTHWEST LANDSCAPING, LLC ROADSIDE,GRNDS,REC, PARK 102-7230-542.48-10 1,217.50 ROADSIDE,GRNDS,REC, PARK 102-7230-542.48-10 1,217.50 ROADSIDE,GRNDS,REC, PARK 102-7230-542.48-10 1,217.50 CED/CONSOLIDATED ELEC DIST ELECTRICAL EQUIP & SUPPLY 102-7230-542.31-20 190.05 HARTNAGEL BUILDING SUPPLY INC PAINTING EQUIPMENT & ACC 102-7230-542.35-01 456.11 HEARTLINE SEED,SOD,SOIL&INOCULANT 102-7230-542.31-20 139.39 HERMANN BROS LOGGING & CONST MISCELLANEOUS SERVICES 102-7230-542.31-20 30.00 LAKESIDE INDUSTRIES INC ROAD/HWY MATERIALS ASPHLT 102-7230-542.31-20 2,852.09 ROAD/HWY MATERIALS ASPHLT 102-7230-542.31-20 304.92 ROAD/HWY MATERIALS ASPHLT 102-7230-542.31-20 515.29 ROAD/HWY MATERIALS ASPHLT 102-7230-542.31-20 2,689.87 PORT ANGELES POWER EQUIPMENT AUTO & TRUCK MAINT. ITEMS 102-7230-542.31-01 535.97 PUD #1 OF CLALLAM COUNTY MISC PROFESSIONAL SERVICE 102-7230-542.47-10 27.61 MISC PROFESSIONAL SERVICE 102-7230-542.47-10 15.50 MISC PROFESSIONAL SERVICE 102-7230-542.47-10 23.90 SWAIN'S GENERAL STORE INC FIRST AID & SAFETY EQUIP.102-7230-542.31-01 220.46 LAWN MAINTENANCE EQUIP 102-7230-542.35-01 108.87 TRAFFIC SAFETY SUPPLY CO MARKERS, PLAQUES,SIGNS 102-7230-542.31-25 3,624.19 WESTERN SYSTEMS, INC EXTERNAL LABOR 102-7230-542.48-10 1,500.00 Street Division Total:$19,246.75 Public Works-Street Department Total:$19,246.75 Street Fund Total:$19,246.75 CENTURYLINK 09-06 A/C 300539444 107-5160-528.42-11 79.47 CENTURYLINK-QWEST 09-03 A/C 333809527 107-5160-528.42-11 274.14 DELL MARKETING LP COMPUTER HARDWARE&PERIPHE 107-5160-528.31-60 3,754.69 RADIO & TELECOMMUNICATION 107-5160-528.31-14 48.31 ESCHAT COMMUNICATIONS/MEDIA SERV 107-5160-528.49-01 1,231.05 COMMUNICATIONS/MEDIA SERV 107-5160-528.49-01 1,231.05 INSIGHT PUBLIC SECTOR DATA PROC SERV &SOFTWARE 107-5160-528.48-10 20,140.40 MISC TRAVEL S CRAIG-WAPRO CONF 107-5160-528.43-10 248.20 T LOZANO-CAMP 911 107-5160-528.43-11 40.00 J CONNER-DIFFICULT CONVOS 107-5160-528.43-10 86.00 Page 10 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 16 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount PACIFIC OFFICE EQUIPMENT INC PAPER (OFFICE,PRINT SHOP) 107-5160-528.31-01 188.24 PROCOM HEALTH RELATED SERVICES 107-5160-528.41-50 78.00 QUALITY LOGO PRODUCTS FASTENERS, FASTENING DEVS 107-5160-528.31-61 1,418.86 PRINTING PREPARATIONS 107-5160-528.31-61 26.69 AUTO & TRUCK MAINT. ITEMS 107-5160-528.31-61 1,159.62 MISCELLANEOUS PRODUCTS 107-5160-528.31-61 880.02 PRINTING PREPARATIONS 107-5160-528.31-61 5.75 PRINTING PREPARATIONS 107-5160-528.31-61 30.10 ART EQUIPMENT & SUPPLIES 107-5160-528.31-61 725.77 MISCELLANEOUS PRODUCTS 107-5160-528.31-61 867.77 PRINTING PREPARATIONS 107-5160-528.31-61 5.90 PRINTING PREPARATIONS 107-5160-528.31-61 54.25 QUILL CORPORATION OFFICE SUPPLIES, GENERAL 107-5160-528.31-01 179.39 STORMWIND, LLC HUMAN SERVICES 107-5160-528.43-11 4,970.00 VOIANCE LANGUAGE SERVICES, LLC MISC PROFESSIONAL SERVICE 107-5160-528.42-11 70.19 WA STATE PATROL COMPUTER SOFTWARE FOR MIN 107-5160-528.41-50 1,200.00 Pencom Division Total:$38,993.86 Pencom Department Total:$38,993.86 Pencom Fund Total:$38,993.86 ALPINE AUTO INC PERS,TEMP EMPLOYMENT AGCY 175-5260-524.41-50 2,684.39 PERS,TEMP EMPLOYMENT AGCY 175-5260-524.41-50 3,134.14 EVERGREEN COLLISION CENTER EXTERNAL LABOR SERVICES 175-5260-524.41-50 4,328.78 EVERGREEN TOWING EXTERNAL LABOR SERVICES 175-5260-524.41-50 2,885.85 LINCOLN STREET STATION SHIPPING CASE#25-17749 175-5260-524.42-10 13.56 Code Enforcement Division Total:$13,046.72 Criminal Justice Department Total:$13,046.72 Code Compliance Enforcmt Fund Total:$13,046.72 ANGELES MILLWORK & LUMBER LUMBER& RELATED PRODUCTS 310-5950-594.65-10 70.38 Homeland Security Division Total:$70.38 Public Safety Projects Department Total:$70.38 DIALOG ARCHITECTURE + ENGINEERING CONSULTING SERVICES 310-7910-594.65-10 36,054.00 CONSULTING SERVICES 310-7910-594.65-10 33,034.35 ENVIRONMENTAL SCIENCE ASSOCIATES CONSULTING SERVICES 310-7910-594.65-10 9,820.02 CONSULTING SERVICES 310-7910-594.65-10 4,503.16 Page 11 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 17 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount Cap Improvmt Admin Division Total:$83,411.53 Capital Projects-Pub Wks Department Total:$83,411.53 TRANE US INC AIR CONDITIONING & HEATNG 310-8985-594.65-10 40,878.09 AIR CONDITIONING & HEATNG 310-8985-594.65-10 9,369.72 Misc Parks Projects Division Total:$50,247.81 Capital Proj-Parks & Rec Department Total:$50,247.81 Capital Improvement Fund Total:$133,729.72 2 GRADE, LLC RELEASE RETAINAGE 312-0000-223.40-00 6,159.23 LAKESIDE INDUSTRIES INC RELEASE RETAINAGE 312-0000-223.40-00 2,649.61 Division Total:$8,808.84 Department Total:$8,808.84 FEHR & PEERS CONSULTING SERVICES 312-7930-595.65-10 1,990.21 INTERWEST CONSTRUCTION, INC. CONSTRUCTION SERVICES,HEA 312-7930-595.65-10 259,141.06 SARGENT ENGINEERING, INC ENGINEERING SERVICES 312-7930-595.65-10 729.29 SOUND PUBLISHING INC COMMUNICATIONS/MEDIA SERV 312-7930-595.65-10 297.04 GF-Street Projects Division Total:$262,157.60 Capital Projects-Pub Wks Department Total:$262,157.60 Transportation Benefit Fund Total:$270,966.44 BORDER STATES INDUSTRIES INC ELECTRICAL EQUIP & SUPPLY 401-0000-141.41-00 1,131.61 GENERAL PACIFIC INC ELECTRICAL EQUIP & SUPPLY 401-0000-141.41-00 11,713.81 MISC UTILITY DEPOSIT REFUNDS FINAL BILL REFUND 401-0000-122.10-99 8.02 FINAL BILL REFUND 401-0000-122.10-99 10.89 FINAL BILL REFUND 401-0000-122.10-99 19.65 FINAL BILL REFUND 401-0000-122.10-99 26.35 FINAL BILL REFUND 401-0000-122.10-99 26.42 FINAL BILL REFUND 401-0000-122.10-99 42.19 FINAL BILL REFUND 401-0000-122.10-99 54.09 FINAL BILL REFUND 401-0000-122.10-99 54.97 FINAL BILL REFUND 401-0000-122.10-99 56.93 FINAL BILL REFUND 401-0000-122.10-99 63.60 FINAL BILL REFUND 401-0000-122.10-99 66.17 FINAL BILL REFUND 401-0000-122.10-99 69.49 FINAL BILL REFUND 401-0000-122.10-99 86.23 FINAL BILL REFUND 401-0000-122.10-99 195.24 FINAL BILL REFUND 401-0000-122.10-99 198.92 Page 12 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 18 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount MISC UTILITY DEPOSIT REFUNDS FINAL BILL REFUND 401-0000-122.10-99 231.23 FINAL BILL REFUND 401-0000-122.10-99 237.36 FINAL BILL REFUND 401-0000-122.10-99 248.37 FINAL BILL REFUND 401-0000-122.10-99 273.69 FINAL BILL REFUND 401-0000-122.10-99 394.55 FINAL BILL REFUND 401-0000-122.10-99 500.58 FINAL BILL REFUND 401-0000-122.10-99 542.31 FINAL BILL REFUND 401-0000-122.10-99 624.26 FINAL CREDIT-2607 PLUM B 401-0000-122.10-99 424.25 FINAL CREDIT-415 LOPEZ AV 401-0000-122.10-99 392.75 OVERPAYMENT-1419 I ST 401-0000-122.10-99 25.00 OVERPAYMENT-2126 CLIPPER 401-0000-122.10-99 104.02 OVERPAYMENT-216 N ALBERT 401-0000-122.10-99 548.66 OVERPAYMENT-2316 S EUNICE 401-0000-122.10-99 153.70 OVERPAYMENT-3017 REGENT 401-0000-122.10-99 433.87 OVERPAYMENT-3119 MT ANGEL 401-0000-122.10-99 502.60 FINAL BILL REFUND 401-0000-122.10-99 (231.23) FINAL BILL REFUND 401-0000-122.10-99 231.23 OVERPAYMENT-301 W 3RD ST 401-0000-122.10-99 36.99 Division Total:$19,498.77 Department Total:$19,498.77 AMAZON CAPITAL SERVICES OPTICAL EQUIP ACESS& SUPP 401-7111-533.31-01 131.20 MILSOFT UTILITY SOLUTIONS DATA PROC SERV &SOFTWARE 401-7111-533.48-02 10,302.48 Engineering-Electric Division Total:$10,433.68 BPA-POWER WIRES ELECTRICAL EQUIP & SUPPLY 401-7120-533.33-10 480,050.00 GDS ASSOCIATES CONSULTING SERVICES 401-7120-533.49-01 167.30 MARSH MUNDORF PRATT SULLIVAN MISC PROFESSIONAL SERVICE 401-7120-533.49-01 421.35 MISC CITY CONSERVATION REBATES RENEWABLE ENERGY COST REC 401-7120-533.49-86 1,770.07 WASHINGTON (AUDITOR), STATE OF FINANCIAL SERVICES 401-7120-533.41-50 3,802.00 Power Systems Division Total:$486,210.72 A-1 PERFORMANCE, INC BUILDING MAINT&REPAIR SER 401-7180-533.41-50 488.76 AMAZON CAPITAL SERVICES MATERIAL HNDLING&STOR EQP 401-7180-533.31-01 81.01 AUTO & TRUCK MAINT. ITEMS 401-7180-533.31-60 353.72 Page 13 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 19 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount ANGELES MILLWORK & LUMBER FASTENERS, FASTENING DEVS 401-7180-533.31-20 10.66 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 256.03 BORDER STATES INDUSTRIES INC ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 737.40 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 3,005.64 CED/CONSOLIDATED ELEC DIST ELECTRICAL CABLES & WIRES 401-7180-533.34-02 2,069.10 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 664.29 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 1,650.72 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 2,271.02 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 527.40 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 (36.03) ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 1,246.73 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 542.73 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 2,042.69 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-01 64.83 HAND TOOLS ,POW&NON POWER 401-7180-533.35-01 280.17 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 220.60 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 61.51 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 313.60 ELECTRICAL CABLES & WIRES 401-7180-533.34-02 1,846.20 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 262.00 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 1,075.14 MATERIAL HNDLING&STOR EQP 401-7180-533.34-02 314.94 MATERIAL HNDLING&STOR EQP 401-7180-533.34-02 586.44 CINTAS CORPORATION NO. 2 FIRST AID & SAFETY EQUIP.401-7180-533.31-01 135.29 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 401-7180-533.44-50 51,593.59 EXPONENTIAL POWER, INC HARDWARE,AND ALLIED ITEMS 401-7180-533.35-01 6,002.02 FRONTIER PRECISION, INC. HAND TOOLS ,POW&NON POWER 401-7180-533.31-60 585.61 GENERAL PACIFIC INC FIRE PROTECTION EQUIP/SUP 401-7180-533.31-01 66.54 FIRE PROTECTION EQUIP/SUP 401-7180-533.31-01 103.89 HI-TECH SECURITY COMMUNICATIONS/MEDIA SERV 401-7180-533.41-50 415.00 JOHNSON ELECTRIC COMPANY CONSTRUCTION SERVICES,TRA 401-7180-594.64-10 17,080.97 KENNEDY, STEPHEN H. BLANKET PURCHASE ORDER 401-7180-533.45-30 19,443.57 LIBBY ENVIRONMENTAL ENVIRONMENTAL&ECOLOGICAL 401-7180-533.49-90 579.00 MISC EMPLOYEE EXPENSE REIMBURSEMENT #0006826 - SAFETY GLASSES 401-7180-533.31-01 213.44 Page 14 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 20 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount MISC EMPLOYEE EXPENSE REIMBURSEMENT COUNTY FAIR DEMONSTRATION 401-7180-533.31-01 42.99 MT VIEW LOCATING SERVICES MISCELLANEOUS SERVICES 401-7180-533.41-50 2,900.00 MURREY'S DISPOSAL CO, INC BUILDING MAINT&REPAIR SER 401-7180-533.47-10 732.48 MATERIAL HNDLING&STOR EQP 401-7180-533.41-50 312.55 OLYMPIC STATIONERS INC OFFICE SUPPLIES, GENERAL 401-7180-533.31-01 65.61 PLATT ELECTRIC SUPPLY INC ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 54.28 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 18.02 HAND TOOLS ,POW&NON POWER 401-7180-533.35-01 325.79 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 985.40 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 163.48 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 63.86 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 17.04 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 449.58 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 179.91 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 623.67 RAINBOW SWEEPERS, INC ROADSIDE,GRNDS,REC, PARK 401-7180-533.48-10 571.73 ROADSIDE,GRNDS,REC, PARK 401-7180-533.48-10 571.73 ROADSIDE,GRNDS,REC, PARK 401-7180-533.48-10 571.73 SECURITY SERVICES NW, INC COMMUNICATIONS/MEDIA SERV 401-7180-533.41-50 750.00 SWAIN'S GENERAL STORE INC MATERIAL HNDLING&STOR EQP 401-7180-533.34-02 25.01 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 57.71 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 6.07 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 38.61 THURMAN SUPPLY MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 7.32 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 79.94 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 20.75 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 52.04 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 30.10 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 42.37 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 401-7180-533.49-90 23.81 WESCO ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 930.55 ZORO TOOLS MATERIAL HNDLING&STOR EQP 401-7180-533.31-01 676.24 PAINTS,COATINGS,WALLPAPER 401-7180-533.31-20 200.99 Page 15 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 21 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount Electric Operations Division Total:$128,747.58 Public Works-Electric Department Total:$625,391.98 Electric Utility Fund Total:$644,890.75 FERGUSON ENTERPRISES INC PIPE AND TUBING 402-0000-141.40-00 2,395.80 FOWLER COMPANY, H D PIPE AND TUBING 402-0000-141.40-00 234.93 PIPE FITTINGS 402-0000-141.40-00 4,045.66 ZENNER USA PIPE FITTINGS 402-0000-141.40-00 9,546.68 Division Total:$16,223.07 Department Total:$16,223.07 AMERICAN WATER WORKS ASSN MEMBERSHIPS 402-7380-534.49-01 285.00 ANGELES MILLWORK & LUMBER BUILDER'S SUPPLIES 402-7380-534.31-20 20.87 FASTENERS, FASTENING DEVS 402-7380-534.31-20 31.19 SALT (SODIUM CHLORIDE) 402-7380-534.31-05 144.68 SALT (SODIUM CHLORIDE) 402-7380-534.31-05 651.08 HARDWARE,AND ALLIED ITEMS 402-7380-534.31-01 122.37 CED/CONSOLIDATED ELEC DIST ELECTRICAL EQUIP & SUPPLY 402-7380-534.31-20 506.77 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 402-7380-534.44-50 30,034.20 FEDERAL EXPRESS CORP SHIPPING CHGS-ROMAC 402-7380-534.42-10 6.68 FRONTIER PRECISION, INC. HAND TOOLS ,POW&NON POWER 402-7380-534.31-60 585.61 GENERAL PACIFIC INC FIRST AID & SAFETY EQUIP.402-7380-534.31-01 454.95 JOHNSON CONTROLS SECURITY SOLUTIONS SECURITY,FIRE,SAFETY SERV 402-7380-534.41-50 45.43 SECURITY,FIRE,SAFETY SERV 402-7380-534.41-50 45.43 MCMASTER-CARR SUPPLY CO PIPE FITTINGS 402-7380-534.31-01 41.50 MISC EMPLOYEE EXPENSE REIMBURSEMENT MAIN BREAK - OT MEAL TICK 402-7380-534.31-01 46.00 MAIN BREAK - OT MEAL TICK 402-7380-534.31-01 46.00 MAIN BREAK - OT MEAL TICK 402-7380-534.31-01 46.00 MAIN BREAK - OT MEAL TICK 402-7380-534.31-01 46.00 MAIN BREAK - OT MEAL TICK 402-7380-534.31-01 46.00 MAIN BREAK - OT MEAL TICK 402-7380-534.31-01 46.00 MAIN BREAK - OT MEAL TICK 402-7380-534.31-01 46.00 PLATT ELECTRIC SUPPLY INC ELECTRICAL EQUIP & SUPPLY 402-7380-534.31-20 285.88 SPECTRA LABORATORIES-KITSAP TESTING&CALIBRATION SERVI 402-7380-534.41-50 333.00 TESTING&CALIBRATION SERVI 402-7380-534.41-50 333.00 THURMAN SUPPLY PIPE AND TUBING 402-7380-534.31-01 100.09 PIPE FITTINGS 402-7380-534.31-01 167.36 Page 16 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 22 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount THURMAN SUPPLY PUMPS & ACCESSORIES 402-7380-534.31-20 206.23 TMG SERVICES INC CONSTRUCTION SERVICES,TRA 402-7380-534.31-20 6,310.30 US BANK-DEBT SVC WIRES FINANCIAL SERVICES 402-7380-534.41-50 51.98 USA BLUEBOOK CHEMICAL LAB EQUIP & SUPP 402-7380-534.35-01 911.34 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 402-7380-534.49-90 23.80 WESTERN STEEL METALS,BARS,PLATES,RODS 402-7380-534.31-20 302.87 Water Division Total:$42,323.61 HEARTLINE HARDWARE,AND ALLIED ITEMS 402-7382-534.31-01 94.58 Industrial Water Treatmnt Division Total:$94.58 Public Works-Water Department Total:$42,418.19 Water Utility Fund Total:$58,641.26 ALS ENVIRONMENTAL MISC PROFESSIONAL SERVICE 403-0000-237.00-00 (34.97) MISC PROFESSIONAL SERVICE 403-0000-237.00-00 (34.97) DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 403-0000-237.00-00 333.65 Division Total:$263.71 Department Total:$263.71 ALS ENVIRONMENTAL MISC PROFESSIONAL SERVICE 403-7480-535.41-50 427.97 MISC PROFESSIONAL SERVICE 403-7480-535.41-50 427.97 AMAZON CAPITAL SERVICES PLUMBING EQUIP FIXT,SUPP 403-7480-535.31-01 943.67 ANGELES MILLWORK & LUMBER HOSES, ALL KINDS 403-7480-535.31-01 10.39 ROAD/HWY MAT NONASPHALTIC 403-7480-535.31-20 380.37 BUILDER'S SUPPLIES 403-7480-535.31-20 359.26 FASTENERS, FASTENING DEVS 403-7480-535.31-20 12.27 HARDWARE,AND ALLIED ITEMS 403-7480-535.31-01 22.35 PIPE FITTINGS 403-7480-535.31-20 5.74 CUES PHOTOGRAPHIC EQUIPMENT 403-7480-535.31-01 190.98 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 403-7480-535.44-50 24,552.49 FERGUSON ENTERPRISES INC PIPE AND TUBING 403-7480-535.31-20 448.18 FRONTIER PRECISION, INC. HAND TOOLS ,POW&NON POWER 403-7480-535.31-60 585.61 GRAINGER HOSES, ALL KINDS 403-7480-535.31-20 565.14 PLUMBING EQUIP FIXT,SUPP 403-7480-535.31-20 395.76 SHOES AND BOOTS 403-7480-535.31-01 173.30 FIRST AID & SAFETY EQUIP.403-7480-535.31-01 73.08 FIRST AID & SAFETY EQUIP.403-7480-535.31-01 128.32 Page 17 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 23 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount GRAINGER FIRST AID & SAFETY EQUIP.403-7480-535.31-01 82.46 FIRST AID & SAFETY EQUIP.403-7480-535.31-01 84.15 HAND TOOLS ,POW&NON POWER 403-7480-535.31-01 217.48 LAB EQUIP,BIO,CHEM,ENVIR 403-7480-535.31-01 81.15 HARDWARE,AND ALLIED ITEMS 403-7480-535.35-01 135.42 STEAM & HOT WATER FITTING 403-7480-535.31-20 404.88 HASA, INC WATER&SEWER TREATING CHEM 403-7480-535.31-05 14,460.98 LEITZ FARMS, INC WATER SEWAGE TREATMENT EQ 403-7480-535.31-20 3.26 MCMASTER-CARR SUPPLY CO JANITORIAL SUPPLIES 403-7480-535.31-01 209.67 METALS,BARS,PLATES,RODS 403-7480-535.31-20 103.94 HOSES, ALL KINDS 403-7480-535.31-20 157.05 BEARINGS (EXCEPT WHEEL) 403-7480-535.31-20 580.60 MISC EMPLOYEE EXPENSE REIMBURSEMENT CDL RENEWAL REIMBURSEMENT 403-7480-535.49-90 136.00 NAPA AUTO PARTS BELTS AND BELTING 403-7480-535.31-20 104.85 NCL NORTH CENTRAL LABORATORIES CHEMICAL LAB EQUIP & SUPP 403-7480-535.31-01 872.73 CHEMICAL LAB EQUIP & SUPP 403-7480-535.31-01 646.71 PETROCARD, INC FUEL,OIL,GREASE, & LUBES 403-7480-535.32-20 190.73 FUEL,OIL,GREASE, & LUBES 403-7480-535.32-20 189.51 PROFESSIONAL TRAINING ASSN AUTO SHOP EQUIPMENT & SUP 403-7480-535.43-10 1,368.00 PUD #1 OF CLALLAM COUNTY MISC PROFESSIONAL SERVICE 403-7480-535.47-10 284.42 MISC PROFESSIONAL SERVICE 403-7480-535.47-10 322.91 PUMPTECH INC PUMPS & ACCESSORIES 403-7480-594.64-10 13,449.15 SWAIN'S GENERAL STORE INC AIR CONDITIONING & HEATNG 403-7480-535.31-01 58.89 HARDWARE,AND ALLIED ITEMS 403-7480-535.31-01 35.34 HAND TOOLS ,POW&NON POWER 403-7480-535.31-01 98.33 JANITORIAL SUPPLIES 403-7480-535.31-01 35.09 SEED,SOD,SOIL&INOCULANT 403-7480-535.31-01 117.01 BRUSHES (NOT CLASSIFIED) 403-7480-535.31-01 65.73 ROOFING MATERIALS 403-7480-535.31-01 522.37 FASTENERS, FASTENING DEVS 403-7480-535.31-20 13.04 JANITORIAL SUPPLIES 403-7480-535.31-01 82.67 FOODS: PERISHABLE 403-7480-535.31-20 114.89 FIRST AID & SAFETY EQUIP.403-7480-535.31-01 109.47 FIRST AID & SAFETY EQUIP.403-7480-535.35-01 29.88 Page 18 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 24 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount SWAIN'S GENERAL STORE INC PAINTING EQUIPMENT & ACC 403-7480-535.31-01 64.57 TENELCO MISCELLANEOUS SERVICES 403-7480-535.47-10 4,391.71 THURMAN SUPPLY LAWN MAINTENANCE EQUIP 403-7480-535.31-20 25.59 UNIT PROCESS COMPANY WATER SEWAGE TREATMENT EQ 403-7480-535.41-50 1,043.79 US BANK-DEBT SVC WIRES FINANCIAL SERVICES 403-7480-535.41-50 293.82 USA BLUEBOOK CHEMICAL LAB EQUIP & SUPP 403-7480-535.35-01 1,143.56 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 403-7480-535.49-90 23.80 WA STATE DEPARTMENT OF ECOLOGY ENVIRONMENTAL&ECOLOGICAL 403-7480-535.49-90 12,906.50 WALTER E NELSON CO PAPER & PLASTIC-DISPOSABL 403-7480-535.31-01 391.41 PAPER & PLASTIC-DISPOSABL 403-7480-535.31-01 287.07 Wastewater Division Total:$85,643.43 Public Works-Wastewater Department Total:$85,643.43 Wastewater Utility Fund Total:$85,907.14 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 404-0000-237.00-00 319.40 Division Total:$319.40 Department Total:$319.40 AMAZON CAPITAL SERVICES FIRST AID & SAFETY EQUIP.404-7538-537.31-01 122.40 PAPER (OFFICE,PRINT SHOP) 404-7538-537.31-01 381.04 ANGELES MILLWORK & LUMBER HAND TOOLS ,POW&NON POWER 404-7538-537.35-01 62.90 CLOTHING ACCESSORIES(SEE 404-7538-537.31-01 96.17 CLEAN EARTH EVIRONMENTAL SOLUTIONS PW CONSTRUCTION & RELATED 404-7538-537.41-50 31,373.55 PW CONSTRUCTION & RELATED 404-7538-537.41-50 37,704.74 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 404-7538-537.44-50 36,146.51 HERMANN BROS LOGGING & CONST ROADSIDE,GRNDS,REC, PARK 404-7538-537.41-50 13,486.40 MISCELLANEOUS SERVICES 404-7538-537.41-50 1,575.00 MISC EMPLOYEE EXPENSE REIMBURSEMENT AUGUST MILEAGE REIMBURSEM 404-7538-537.31-01 12.54 AUGUST MILEAGE REIMBURSEM 404-7538-537.31-01 16.87 AUGUST MILEAGE REIMBURSEM 404-7538-537.31-01 71.06 AUGUST MILEAGE REIMBURSEM 404-7538-537.31-01 239.86 MEAL REIMBURSEMENT - CALL 404-7538-537.31-01 69.00 PUD #1 OF CLALLAM COUNTY MISC PROFESSIONAL SERVICE 404-7538-537.47-10 90.67 MISC PROFESSIONAL SERVICE 404-7538-537.47-10 89.06 RABANCO, LTD MISCELLANEOUS SERVICES 404-7538-537.41-51 53,959.51 Page 19 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 25 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount REGIONAL DISPOSAL BUILDING MAINT&REPAIR SER 404-7538-537.41-51 24,488.56 BUILDING MAINT&REPAIR SER 404-7538-537.41-51 45,557.93 BUILDING MAINT&REPAIR SER 404-7538-537.41-51 513,973.69 SWAIN'S GENERAL STORE INC CLOTHING ACCESSORIES(SEE 404-7538-537.31-01 211.53 US BANK-DEBT SVC WIRES FINANCIAL SERVICES 404-7538-537.41-50 350.00 FINANCIAL SERVICES 404-7538-537.41-50 350.00 SW - Transfer Station Division Total:$760,428.99 A-1 PERFORMANCE, INC BUILDING MAINT&REPAIR SER 404-7580-537.41-50 152.70 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 404-7580-537.44-50 26,374.23 REHRIG PACIFIC COMPANY, INC HARDWARE,AND ALLIED ITEMS 404-7580-537.35-01 24,665.85 Solid Waste-Collections Division Total:$51,192.78 GEOSYNTEC CONSULTANTS CONSULTING SERVICES 404-7585-537.41-50 17,577.25 Solid Waste-Landfill Division Total:$17,577.25 Public Works-Solid Waste Department Total:$829,199.02 Solid Waste Utility Fund Total:$829,518.42 A/R MISCELLANEOUS REFUNDS REFUND-STORMWATER FEES 20 406-7412-343.83-00 1,769.55 ALS ENVIRONMENTAL MISC PROFESSIONAL SERVICE 406-7412-538.41-50 899.00 AMAZON CAPITAL SERVICES PIPE FITTINGS 406-7412-538.31-20 78.36 ANGELES CONCRETE PRODUCTS BUILDER'S SUPPLIES 406-7412-538.31-20 165.62 ANGELES MILLWORK & LUMBER HARDWARE,AND ALLIED ITEMS 406-7412-538.35-01 448.71 LUMBER& RELATED PRODUCTS 406-7412-538.31-20 28.63 CLALLAM CNTY DEPT OF HEALTH LAB EQUIP,BIO,CHEM,ENVIR 406-7412-538.41-50 950.00 CLALLAM COOPERATIVE ASSN INC SEED,SOD,SOIL&INOCULANT 406-7412-538.31-20 364.55 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-AUGUST 406-7412-538.49-50 521.46 FRONTIER PRECISION, INC. HAND TOOLS ,POW&NON POWER 406-7412-538.31-60 585.61 HEARTLINE ROAD/HWY MAT NONASPHALTIC 406-7412-538.31-20 176.42 MISC EMPLOYEE EXPENSE REIMBURSEMENT REIMBURSEMENT FOR COUNTY 406-7412-538.44-10 23.61 MAIN BREAK - MEAL TICKETS 406-7412-538.31-01 46.00 SWAIN'S GENERAL STORE INC HAND TOOLS ,POW&NON POWER 406-7412-538.31-01 53.30 THURMAN SUPPLY PIPE FITTINGS 406-7412-538.31-20 154.86 PIPE FITTINGS 406-7412-538.31-20 59.22 US BANK-DEBT SVC WIRES FINANCIAL SERVICES 406-7412-538.41-50 4.20 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 406-7412-538.49-90 23.81 Stormwater Division Total:$6,352.91 Page 20 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 26 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount Public Works-Wastewater Department Total:$6,352.91 Stormwater Utility Fund Total:$6,352.91 A/R MISCELLANEOUS REFUNDS JESSE JUDD 409-0000-213.10-90 165.85 Division Total:$165.85 Department Total:$165.85 AP TRITON CONSULTING SERVICES 409-6025-526.41-50 496.04 BAXTER AUTO PARTS #15 MEMBERSHIPS 409-6025-526.31-01 6.39 BOUND TREE MEDICAL, LLC SALE SURPLUS/OBSOLETE 409-6025-526.31-01 2,479.51 SALE SURPLUS/OBSOLETE 409-6025-526.31-13 901.12 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 267.31 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 1,171.31 SALE SURPLUS/OBSOLETE 409-6025-526.31-13 516.67 SALE SURPLUS/OBSOLETE 409-6025-526.31-13 627.00 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 577.08 SALE SURPLUS/OBSOLETE 409-6025-526.31-13 455.61 SALE SURPLUS/OBSOLETE 409-6025-526.31-13 359.99 SALE SURPLUS/OBSOLETE 409-6025-526.31-13 77.37 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 818.51 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 41.98 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 891.54 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 920.72 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 58.36 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 1,186.69 SALE SURPLUS/OBSOLETE 409-6025-526.31-13 1,015.18 CEDAR GROVE COUNSELING, INC. HEALTH RELATED SERVICES 409-6025-526.41-50 50.00 HEALTH RELATED SERVICES 409-6025-526.41-50 50.00 EMSCONNECT MEMBERSHIPS 409-6025-526.43-10 339.22 MEMBERSHIPS 409-6025-526.43-10 347.39 LINCOLN STREET STATION SHIPPING AND HANDLING 409-6025-526.31-01 13.88 EQUIP MAINT & REPAIR SERV 409-6025-526.31-01 22.63 EXTERNAL LABOR 409-6025-526.31-01 18.09 MISC EMPLOYEE EXPENSE REIMBURSEMENT HARBOR FREIGHT REIMB 409-6025-526.31-01 97.95 MISC ONE-TIME VENDORS INSURANCE, ALL TYPES 409-6025-526.20-20 7,244.89 OLYMPIC MEDICAL CENTER HEALTH RELATED SERVICES 409-6025-526.41-50 287.00 Page 21 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 27 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount OLYMPIC PRINTERS INC PRINTING,SILK SCR,TYPSET 409-6025-526.31-01 451.94 PORT ANGELES POWER EQUIPMENT METALS,BARS,PLATES,RODS 409-6025-526.31-01 54.28 SEQUIM MEDICAL ASSOCIATES HEALTH RELATED SERVICES 409-6025-526.41-50 338.00 MEMBERSHIPS 409-6025-526.41-50 75.00 SWAIN'S GENERAL STORE INC AUTO SHOP EQUIPMENT & SUP 409-6025-526.31-01 45.10 SYSTEMS DESIGN WEST, LLC CONSULTING SERVICES 409-6025-526.41-50 30,000.00 HUMAN SERVICES 409-6025-526.41-50 5,223.92 CONSULTING SERVICES 409-6025-526.41-50 4,075.92 WA STATE HEALTH CARE AUTHORITY HUMAN SERVICES 409-6025-526.41-50 23,148.42 ZIEGLER APPAREL CLOTHING & APPAREL 409-6025-526.31-01 90.93 Medic I Division Total:$84,842.94 Fire Department Total:$84,842.94 Medic I Utility Fund Total:$85,008.79 INTEGRAL CONSULTING, INC CONSULTING SERVICES 413-7481-535.41-50 799.00 CONSULTING SERVICES 413-7481-535.41-50 1,874.00 CONSULTING SERVICES 413-7481-535.41-50 5,867.00 Wastewater Remediation Division Total:$8,540.00 Public Works-Wastewater Department Total:$8,540.00 Harbor Clean Up Fund Total:$8,540.00 ALL WEATHER HEATING AND COOLING AIR CONDITIONING & HEATNG 421-7121-533.49-86 920.00 C & F INSULATION CONSTRUCTION SERVICES,TRA 421-7121-533.49-86 268.35 DAVE'S HEATING & COOLING SVC AIR CONDITIONING & HEATNG 421-7121-533.49-86 920.00 AIR CONDITIONING & HEATNG 421-7121-533.49-86 2,000.00 AIR CONDITIONING & HEATNG 421-7121-533.49-86 920.00 AIR CONDITIONING & HEATNG 421-7121-533.49-86 6,000.00 AIR CONDITIONING & HEATNG 421-7121-533.49-86 920.00 HARTNAGEL BUILDING SUPPLY INC BUILDER'S SUPPLIES 421-7121-533.49-86 1,412.32 BUILDER'S SUPPLIES 421-7121-533.49-86 40.00 BUILDER'S SUPPLIES 421-7121-533.49-86 470.40 BUILDER'S SUPPLIES 421-7121-533.49-86 116.16 BUILDER'S SUPPLIES 421-7121-533.49-86 567.36 Conservation Division Total:$14,554.59 Public Works-Electric Department Total:$14,554.59 Page 22 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 28 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount Conservation Fund Total:$14,554.59 NRC ENVIRONMENTAL SERVICES, INC ENVIRONMENTAL&ECOLOGICAL 451-7188-594.65-10 7,733.79 Electric Projects Division Total:$7,733.79 Public Works-Electric Department Total:$7,733.79 Electric Utility CIP Fund Total:$7,733.79 2 GRADE, LLC RELEASE RETAINAGE 452-0000-223.40-00 12,249.22 Division Total:$12,249.22 Department Total:$12,249.22 Water Utility CIP Fund Total:$12,249.22 CONSTRUCTION INSPECTION SERVICES ENVIRONMENTAL&ECOLOGICAL 453-7488-594.65-10 3,711.29 ENVIRONMENTAL&ECOLOGICAL 453-7488-594.65-10 1,206.90 INTERWEST CONSTRUCTION, INC. CONSTRUCTION SERVICES,HEA 453-7488-594.65-10 323,592.24 SARGENT ENGINEERING, INC CONSULTING SERVICES 453-7488-594.65-10 713.93 Wastewater Projects Division Total:$329,224.36 Public Works-Wastewater Department Total:$329,224.36 WasteWater Utility CIP Fund Total:$329,224.36 AMAZON CAPITAL SERVICES AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 566.17 AUTOZONE STORES, INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 130.94 BAILEY SIGNS & GRAPHICS AUTO & TRUCK ACCESSORIES 501-0000-141.40-00 287.50 BAXTER AUTO PARTS #15 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 127.54 DAREN'S POINT S AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 962.18 DOBBS PETERBILT INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 16.29 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 150.41 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 436.65 FIRE CHIEF EQUIPMENT CO, INC AUTO & TRUCK ACCESSORIES 501-0000-141.40-00 1,383.85 GRAINGER HOSES, ALL KINDS 501-0000-141.40-00 263.45 HOSES, ALL KINDS 501-0000-141.40-00 632.41 HOSES, ALL KINDS 501-0000-141.40-00 962.41 HUGHES FIRE EQUIPMENT INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 267.46 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 268.69 IRONCLAD COMPANY AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 3,452.13 MCMASTER-CARR SUPPLY CO AUTO & TRUCK ACCESSORIES 501-0000-141.40-00 55.06 MOTION INDUSTRIES, INC HOSES, ALL KINDS 501-0000-141.40-00 85.41 HOSES, ALL KINDS 501-0000-141.40-00 1,673.71 Page 23 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 29 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount NAPA AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 230.07 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 307.57 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 10.89 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 28.16 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 205.40 O'REILLY AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 143.52 OWEN EQUIPMENT AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 258.12 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 501.35 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 2,652.09 PAPE-KENWORTH NORTHWEST, INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 285.99 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 252.73 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 93.56 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 265.61 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 535.48 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 1,533.94 PENINSULA LUBRICANTS AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 376.16 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 206.34 PETROCARD, INC FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 1,122.20 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 22,957.99 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 27,643.37 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 27,990.14 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 1,861.91 SMALL & SONS OIL DIST CO. AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 626.19 SOLID WASTE SYSTEMS, INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 (462.76) AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 (462.76) AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 384.83 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 427.84 SSI SHREDDING SYSTEMS INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 2,717.45 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 494.31 TACOMA DODGE CHRYSLER JEEP AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 462.09 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 1,343.68 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 320.90 TACOMA SCREW PRODUCTS INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 62.10 WESTERN EQUIPMENT DISTRIB INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 2,141.68 Page 24 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 30 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount WESTERN EQUIPMENT DISTRIB INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 53.59 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 339.89 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 107.18 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 153.83 WESTERN STEEL METALS,BARS,PLATES,RODS 501-0000-141.40-00 302.87 Division Total:$110,197.76 Department Total:$110,197.76 A-1 PERFORMANCE, INC BUILDING MAINT&REPAIR SER 501-7630-548.41-50 188.20 AMAZON CAPITAL SERVICES AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 59.72 ANGELES MILLWORK & LUMBER AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 24.82 AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 26.36 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 21.22 AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 73.78 AUTOZONE STORES, INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 182.19 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 690.00 BAXTER AUTO PARTS #15 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 10.63 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 98.10 DAREN'S POINT S EXTERNAL LABOR SERVICES 501-7630-548.34-02 28.04 EXTERNAL LABOR SERVICES 501-7630-548.34-02 62.07 EXTERNAL LABOR SERVICES 501-7630-548.34-02 68.17 EXTERNAL LABOR SERVICES 501-7630-548.34-02 222.16 EXTERNAL LABOR SERVICES 501-7630-548.34-02 50.75 EXTERNAL LABOR SERVICES 501-7630-548.34-02 28.04 EXTERNAL LABOR SERVICES 501-7630-548.34-02 243.45 EXTERNAL LABOR SERVICES 501-7630-548.34-02 243.45 DOBBS PETERBILT INC SHIPPING AND HANDLING 501-7630-548.34-02 (272.25) AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 44.59 FREIGHTLINER NORTHWEST AUTO & TRUCK 501-7630-548.34-02 (425.40) AUTO & TRUCK 501-7630-548.34-02 425.40 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 875.33 GRAINGER AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 351.12 HEARTLINE AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 311.40 HECKMAN MOTORS, INC EXTERNAL LABOR SERVICES 501-7630-548.34-02 942.00 HUGHES FIRE EQUIPMENT INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 7,364.49 LES SCHWAB TIRE CENTER EXTERNAL LABOR SERVICES 501-7630-548.34-02 74.97 Page 25 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 31 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount LES SCHWAB TIRE CENTER AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 2,211.80 EXTERNAL LABOR SERVICES 501-7630-548.34-02 365.72 EXTERNAL LABOR SERVICES 501-7630-548.34-02 170.65 MATT'S TOOLS USA, LLC AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 158.54 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 33.26 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 47.73 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 93.76 MCMASTER-CARR SUPPLY CO AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 396.82 N C MACHINERY CO AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 784.87 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 65.64 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 254.06 NAPA AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 113.69 NELSON TRUCK EQUIPMENT CO INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 2,578.63 O'REILLY AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 65.30 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 65.45 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 290.98 BELTS AND BELTING 501-7630-548.34-02 12.52 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 29.93 AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 8.81 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 14.26 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 207.50 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 53.39 OFFICE DEPOT OFFICE SUPPLIES, GENERAL 501-7630-548.31-01 261.79 OWEN EQUIPMENT AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 163.91 PAPE-KENWORTH NORTHWEST, INC EXTERNAL LABOR SERVICES 501-7630-548.34-02 2,523.35 RENTAL/LEASE EQUIPMENT 501-7630-548.48-02 1,143.45 PRICE FORD LINCOLN AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 63.25 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 133.84 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 32.47 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 212.33 SAFETY-KLEEN SYSTEMS AUTO & TRUCK MAINT. ITEMS 501-7630-548.49-90 388.49 SNAP-ON TOOLS - SARGENT TOOLS LLC AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 393.35 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 67.25 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 303.83 Page 26 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 32 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount SOLID WASTE SYSTEMS, INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 1,744.90 SWAIN'S GENERAL STORE INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 260.55 SYSTEMS FOR PUBLIC SAFETY, INC AUTO & TRUCK MAINT. ITEMS 501-7630-594.64-10 23,943.18 EXTERNAL LABOR SERVICES 501-7630-594.64-10 7,854.37 TACOMA SCREW PRODUCTS INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 291.22 AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 20.01 THE AUTO GLASS CLINIC & MOBILE RAD EXTERNAL LABOR SERVICES 501-7630-548.34-02 304.92 THE FAB SHOP, LLC AUTO MAJOR TRANSPORTATION 501-7630-594.64-10 242,171.20 THURMAN SUPPLY AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 18.64 TRANCO TRANSMISSIONS INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 63.16 VESTIS SERVICES LAUNDRY/DRY CLEANING SERV 501-7630-548.49-90 19.16 LAUNDRY/DRY CLEANING SERV 501-7630-548.49-90 19.16 LAUNDRY/DRY CLEANING SERV 501-7630-548.49-90 19.16 LAUNDRY/DRY CLEANING SERV 501-7630-548.49-90 19.16 WA STATE DEPARTMENT OF REVENUE LICENSING FEES-VEH 2610 501-7630-594.64-10 5,206.01 WESTERN EQUIPMENT DISTRIB INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 229.48 WESTERN STEEL METALS,BARS,PLATES,RODS 501-7630-548.34-02 127.48 WILDER TOYOTA INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 38.15 WORLD KINECT ENERGY SVCS FUEL,OIL,GREASE, & LUBES 501-7630-548.32-13 207.75 FUEL,OIL,GREASE, & LUBES 501-7630-548.32-13 291.25 FUEL,OIL,GREASE, & LUBES 501-7630-548.32-13 499.15 FUEL,OIL,GREASE, & LUBES 501-7630-548.32-13 538.10 Equipment Services Division Total:$309,609.58 Public Works Department Total:$309,609.58 Equipment Services Fund Total:$419,807.34 CANON USA, INC OFFICE MACHINES & ACCESS 502-2081-518.45-31 4,131.99 CARAHSOFT TECHNOLOGY CORP MEMBERSHIPS 502-2081-518.41-50 1,610.91 HEWLETT-PACKARD COMPANY COMPUTER HARDWARE&PERIPHE 502-2081-518.31-61 519.49 COMPUTER HARDWARE&PERIPHE 502-2081-518.31-61 1,379.61 COMPUTER HARDWARE&PERIPHE 502-2081-518.31-61 7,617.60 COMPUTER HARDWARE&PERIPHE 502-2081-518.31-61 9,593.57 COMPUTER HARDWARE&PERIPHE 502-2081-518.31-61 12,987.09 COMPUTER HARDWARE&PERIPHE 502-2081-518.31-61 83,922.94 Page 27 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 33 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount MISC EMPLOYEE EXPENSE REIMBURSEMENT MEAL TICKET CC MTG COVERA 502-2081-518.31-01 46.00 PACIFIC OFFICE EQUIPMENT INC MISCELLANEOUS SERVICES 502-2081-518.45-31 250.47 OFFICE MACHINES & ACCESS 502-2081-518.45-31 3,249.25 PROGRESS SOFTWARE CORPORATION DATA PROC SERV &SOFTWARE 502-2081-518.48-02 4,522.34 SHI INTERNATIONAL CORP COMPUTER HARDWARE&PERIPHE 502-2081-518.31-61 551.03 DATA PROC SERV &SOFTWARE 502-2081-518.48-02 2,193.46 VERIZON WIRELESS 09-15 A/C 842160242-00001 502-2081-518.42-10 3,243.25 09-15 A/C 842160242-00003 502-2081-518.42-10 1,289.11 WA5 APPAREL COMPANY CLOTHING & APPAREL 502-2081-518.31-02 457.38 Information Technologies Division Total:$137,565.49 AVI-SPL LLC COMPUTER HARDWARE&PERIPHE 502-2082-594.65-10 9,425.62 DATA PROC SERV &SOFTWARE 502-2082-594.65-10 45,187.65 MISC PROFESSIONAL SERVICE 502-2082-594.65-10 1,128.90 SOUND SYSTEMS & ACCESSORY 502-2082-594.65-10 13,806.73 RETURN EQUIP/SHIPPING 502-2082-594.65-10 (1,037.68) SHI INTERNATIONAL CORP COMPUTERS,DP & WORD PROC. 502-2082-594.65-10 1,950.94 COMPUTER HARDWARE&PERIPHE 502-2082-594.65-10 45,040.82 SOFTRESOURCES LLC CONSULTING SERVICES 502-2082-594.65-10 10,719.84 TYLER TECHNOLOGIES, INC DATA PROC SERV &SOFTWARE 502-2082-594.65-10 1,742.40 DATA PROC SERV &SOFTWARE 502-2082-594.65-10 1,742.40 DATA PROC SERV &SOFTWARE 502-2082-594.65-10 2,613.60 DATA PROC SERV &SOFTWARE 502-2082-594.65-10 3,484.80 DATA PROC SERV &SOFTWARE 502-2082-594.65-10 5,227.20 DATA PROC SERV &SOFTWARE 502-2082-594.65-10 871.20 DATA PROC SERV &SOFTWARE 502-2082-594.65-10 871.20 IT Capital Projects Division Total:$142,775.62 PUD #1 OF CLALLAM COUNTY RADIO & TELECOMMUNICATION 502-2083-518.47-10 62.46 Wireless Mesh Division Total:$62.46 Finance Department Total:$280,403.57 Information Technology Fund Total:$280,403.57 REDACTED DISABILITY BOARD-JULY 503-1631-517.46-35 65.96 DISABILITY BOARD-JULY 503-1631-517.46-35 161.71 REISSUE CK 219070-JULY 503-1631-517.46-35 108.00 Page 28 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 34 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount REDQUOTE, INC. HRA REIMBURSEMENT 503-1631-365.90-20 3,196.43 HRA REIMBURSEMENT 503-1631-365.90-20 8,213.45 Other Insurance Programs Division Total:$11,745.55 DEPARTMENT OF THE TREASURY Q4, 2025 ID 91-6001266 503-1661-517.49-50 662.77 INTERNAL REVENUE SERVICE ID 91-6001266 Q2 2025 720 503-1661-517.49-50 183.80 Worker's Compensation Division Total:$846.57 Self Insurance Department Total:$12,592.12 Self-Insurance Fund Total:$12,592.12 AFLAC AFLAC MONTHLY PREMIUMS 920-0000-231.53-10 1,139.30 AFLAC MONHTLY PREMIUMS 920-0000-231.53-10 1,139.30 AFSCME LOCAL 1619 PAYROLL SUMMARY 920-0000-231.54-40 560.00 BROWN & BROWN OF WASHINGTON PAYROLL SUMMARY 920-0000-231.53-40 3,017.27 CHAPTER 13 TRUSTEE CASE #125-11570 920-0000-231.56-90 1,384.62 PAYROLL SUMMARY 920-0000-231.56-90 1,384.62 EMPLOYEES ASSOCIATION PAYROLL SUMMARY 920-0000-231.55-30 1,160.00 EMPOWER-P/R WIRE PAYROLL SUMMARY 920-0000-231.52-10 456.51 PAYROLL SUMMARY 920-0000-231.52-20 34,821.67 FEDERAL PAYROLL TAX PAYROLL SUMMARY 920-0000-231.50-10 (254.35) PAYROLL SUMMARY 920-0000-231.50-10 127,856.38 PAYROLL SUMMARY 920-0000-231.50-10 (127,856.38) PAYROLL SUMMARY 920-0000-231.50-10 121,829.03 PENSIONER'S P/R TAX 920-0000-231.50-10 100.00 FICA/MEDICARE PAYROLL TAX PAYROLL SUMMARY 920-0000-231.50-20 (460.10) PAYROLL SUMMARY 920-0000-231.50-20 49.70 PAYROLL SUMMARY 920-0000-231.50-20 143,798.36 FIREFIGHTER'S LOCAL 656 PAYROLL SUMMARY 920-0000-231.54-30 4,707.49 PAYROLL SUMMARY 920-0000-231.54-30 330.00 HAWAII DEPARTMENT OF TAXATION PAYROLL SUMMARY 920-0000-231.50-30 479.04 PAYROLL SUMMARY 920-0000-231.50-30 (479.04) HRA VEBA PLAN PAYROLL SUMMARY 920-0000-231.52-60 2,886.81 HSA BANK EMPLOYEE DEDUCTIONS 920-0000-231.52-40 5,821.28 EMPLOYEE DEDUCTIONS 920-0000-231.52-40 180.00 EMPLOYEE DEDUCTIONS 920-0000-231.52-40 6,001.28 PAYROLL SUMMARY 920-0000-231.53-11 384.96 Page 29 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 35 City of Port Angeles City Council Expenditure Report Between Sep 5, 2026 and Sep 25, 2026 Vendor Description Account Number Amount HSA BANK PAYROLL SUMMARY 920-0000-231.53-12 146.00 IBEW LOCAL 997 PAYROLL SUMMARY 920-0000-231.54-20 2,478.44 LEOFF PAYROLL SUMMARY 920-0000-231.51-21 48,870.88 PAYROLL SUMMARY 920-0000-231.51-21 51,065.78 MISSION SQUARE-P/R WIRES PAYROLL SUMMARY 920-0000-231.52-10 (150.00) PAYROLL SUMMARY 920-0000-231.52-10 43,954.58 OFFICE OF SUPPORT ENFORCEMENT PAYROLL SUMMARY 920-0000-231.56-20 1,742.52 PAYROLL SUMMARY 920-0000-231.56-20 1,742.52 PERS PAYROLL SUMMARY 920-0000-231.51-10 584.77 PAYROLL SUMMARY 920-0000-231.51-11 13,876.65 PAYROLL SUMMARY 920-0000-231.51-12 76,250.59 PAYROLL SUMMARY 920-0000-231.51-22 8,087.23 PAYROLL SUMMARY 920-0000-231.51-11 34.37 PAYROLL SUMMARY 920-0000-231.51-12 (324.09) PAYROLL SUMMARY 920-0000-231.51-10 562.46 PAYROLL SUMMARY 920-0000-231.51-11 14,296.35 PAYROLL SUMMARY 920-0000-231.51-12 75,504.84 PAYROLL SUMMARY 920-0000-231.51-22 8,352.60 POLICE ASSOCIATION PAYROLL SUMMARY 920-0000-231.55-10 443.00 TEAMSTERS LOCAL 589 PAYROLL SUMMARY 920-0000-231.54-10 3,016.50 PAYROLL SUMMARY 920-0000-231.54-10 2,929.50 UNITED WAY (PAYROLL) PAYROLL SUMMARY 920-0000-231.56-10 225.00 PAYROLL SUMMARY 920-0000-231.56-10 225.00 WSCCCE AFSCME AFL-CIO PAYROLL SUMMARY 920-0000-231.54-40 7,609.25 WSCFF/EMPLOYEE BENEFIT TRUST PAYROLL SUMMARY 920-0000-231.53-20 7,200.00 Division Total:$699,162.49 Department Total:$699,162.49 Payroll Clearing Fund Total:$699,162.49 Total for Checks Dated Between Sep 5, 2026 and Sep 25, 2026 $4,448,734.51 Page 30 of 30 Sep 29, 2026 6:54:22 AM October 6, 2026 E - 36 Date: October 6, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Light Operations Material Purchase: Electric Meters Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This purchase directly aligns with Strategic Focus Area # 4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: This procurement will stock inventory of residential 240V electric meters for the Light Operations Division. The meters will be used for the current needs of aged and failing meters as well as new service installation. As a participating member of the cooperative purchasing group, the City can piggyback on contracts awarded by Sourcewell to save time in delivery and obtain better pricing and contract terms. This purchase is expected to arrive within two weeks from the date of purchase. Funding Overview: Funding is available in the amount of $36,843.92, including tax, as material inventory through the 2026 Electric Utility Operational budget (401-7180-533-34-02). Summary: Staff is seeking City Council approval for the purchase of two hundred and forty (240) 240V electrical meters for the Light Operations Division in the amount of $36,843.92, including taxes. Through the City’s membership with Sourcewell cooperative purchasing, participating distributor of general electrical supplies WESCO of Portland, OR, was selected from the cooperative vendor list, Contract No. 091422-WES. Strategic Plan: This purchase directly aligns with Strategic Focus Area# 4 – Infrastructure Development, Maintenance, and Connectivity. Funding: Funding is available in the amount of $36,843.92, including tax, as material inventory through the 2026 Electric Utility Operational budget (401-7180-533-34-02). Recommendation: 1) Approve the purchase of two hundred and forty (240) electric meters from WESCO of Portland, OR, through the Sourcewell cooperative purchasing agreement, in the amount of $36,843.92, including applicable taxes; and 2) authorize the City Manager to sign all contract-related documents, to administer the contract, and to make minor modifications as necessary. October 6, 2026 E - 37 Pricing from the Sourcewell Cooperative Purchasing contract is summarized below: Vendor Product Quantity Unit Price Price WESCO Distribution, Inc. HBA10YC2-0AJ7-6000 Axe-SD, FM2S, CL200, 240V, Mesh IP 240 $140.97 $33,832.80 Tax 8.9% 1 $3,011.12 TOTAL: $36,843.92 Attachments: Quotation U00814936.00 October 6, 2026 E - 38 October 6, 2026 E - 39 Date: October 6, 2026 To: City Council From: Brian S. Smith, Chief of Police Subject: Interagency Agreement Between WA Traffic Safety Commission and the Port Angeles Police Department / City of Port Angeles Relationship to the Strategic Plan: Our long-standing operations and collaboration with the Washington Traffic Safety Commission promote efficiency and enhances our capacity to carry out law enforcement duties. This is consistent with the 2025-2026 Strategic Plan, including Strategic Focus Area (SFA) #1C “Improve public safety and peace of mind in our community while promoting policies that create efficient practices,” and SFA #2D “Promote efficient practices.” Background / Analysis: This is an annual grant award from the WTSC and to local agencies. PAPD is a grant sub-recipient. This grant affords PAPD the opportunity to engage in traffic enforcement activities that it would be otherwise unable to accomplish due to staffing and other workload constraints. The WTSC has awarded funding to the WTSC Region 1 Traffic Safety Task Force for the purpose of conducting coordinated HVE enforcement and community outreach/collaboration activities. The funding Summary: The City is a sub-recipient in the annual traffic safety grant that is provided by the United States Department of Transportation (USDOT) National Highway Traffic Safety Administration (NHTSA). This grant specifically provides funding for the law enforcement agencies in Washington Traffic Safety Commission (WTSC) Region 1 to conduct straight time or overtime enforcement activities with traffic safety emphasis patrols. To receive this funding, it is necessary for the City to enter into an Interagency Agreement with the WTSC. Strategic Plan: The Port Angeles Police Department (PAPD) has limited resources. We have a long- standing practice of working with the WTSC to support our law enforcement operations. This approach significantly improves our efficiency and our capacity. This collaboration supports the Strategic Plan in areas that include Strategic Focus Area (SFA) #1C “Improve public safety and peace of mind in our community while promoting policies that create efficient practices,” and SFA #2D “Promote efficient practices.” Funding: The WTSC will provide overtime funding (to agencies in an amount to be determined) to the WTSC Region 1 Traffic Safety Task Force for the purpose of conducting coordinated, high visibility enforcement (HVE) and community outreach/collaboration activities. The funding must be used for traffic safety purposes in the areas of impaired driving, distracted driving, occupant restraint use, speeding, and motorcycle safety. The amount of funds received by the Port Angeles Police Department (PAPD) will depend upon the level of PAPD participation. There is no match requirement. Recommendation: 1) Approve the Interagency Agreement between the Washington Traffic Safety Commission and the City of Port Angeles for its Police Department for the period of performance between October 1, 2026, and September 30, 2027; and 2) authorize the City Manager to sign and implement all actions necessary to manage and administer the Agreement. October 6, 2026 E - 40 must be used for traffic safety purposes in the areas of impaired driving, distracted driving, occupant restraint use, speeding, and motorcycle safety. By signing this agreement, the City as a Sub-recipient can seek reimbursement for approved straight time or overtime expenses incurred as a participant in this grant. Funds are expressly designated for staffing activities and may not be used for other expenses that may be incurred, such as vehicle damage, supply replacement, etc. All activity must be coordinated by the region’s traffic safety task force to be eligible for reimbursement. Funding Overview: The WTSC will provide overtime funding to agencies in an amount to be determined. The funding is for the WTSC Region 1 Traffic Safety Task Force for the purpose of conducting coordinated HVE enforcement and community outreach/collaboration activities. There is no match requirement. Attachments: 1. Interagency Agreement between the Washington Traffic Safety Commission and Port Angeles Police Department 2. Grant Requirements Acknowledgement Form for HVE Mobilizations. October 6, 2026 E - 41 HVE_IAA_Agreement_Port Angeles Police Department  INTERAGENCY AGREEMENT BETWEEN THEWashington Traffic Safety CommissionANDPort Angeles Police DepartmentTHIS AGREEMENT is made and entered into by and between the Washington Traffic Safety Commission,hereinafter referred to as “WTSC,” and SUB RECIPIENT NAME Port Angeles Police Department,hereinafter referred to as “SUB-RECIPIENT.”NOW THEREFORE, in consideration of the authority provided to WTSC in RCW 43.59 and RCW 39.34,terms, conditions, covenants, and performance contained herein, or attached and incorporated and madea part hereof, the parties mutually agree as follows:  1.PURPOSE OF THE AGREEMENT:The purpose of this Agreement is to provide funding, provided by the United States Department ofTransportation (USDOT) National Highway Traffic Safety Administration (NHTSA) and allowed under theAssistance Listings Catalog of Federal Domestic Assistance (CFDA) numbers 20.600 and 20.616 fortraffic safety grant project 2027-HVE-6073-Region 1 HVE, specifically to provide funding for the lawenforcement agencies in WTSC Region 1 to conduct straight time or overtime enforcement activities(traffic safety emphasis patrols) as outlined in the Statement of Work (SOW), in support of Target Zeropriorities. The Target Zero Manager (TZM) and/or the Law Enforcement Liaison (LEL) shall coordinate theSOW with the SUB-RECIPIENT with the goal of reducing traffic crashes.WTSC grant 2027-HVE-6073-Region 1 HVE was awarded to the WTSC Region 1 to support collaborativeefforts to conduct HVE activities. By signing this agreement, the SUB-RECIPIENT can seek reimbursementfor straight time or overtime for approved law enforcement activity expenses incurred as a participant inthe region’s HVE grant.2.PERIOD OF PERFORMANCEThe period of performance of this Agreement shall commence upon the date of execution by both parties,but not earlier than October 1, 2026, and remain in effect until September 30, 2027, unless terminatedsooner, as provided herein.3.SCOPE OF WORK3.1.1 Problem ID and/or OpportunityAlthough Washington has experienced encouraging declines in traffic fatalities since the record-high yearof 2023, traffic deaths remain substantially above pre-pandemic levels, and risky driving behaviorscontinue to claim hundreds of lives each year. After reaching 809 fatalities in 2023, the highest annualtotal since 1990, fatalities declined to 737 in 2024 and an estimated 659 in 2025. Despite this progress,Page 1 of 21October 6, 2026 E - 42 Washington has not yet returned to pre-COVID fatality levels, and the primary behavioral factors targetedthrough High Visibility Enforcement remain major contributors to fatal and serious injury crashes.In 2025 alone:•382 fatalities involved an impaired driver.•189 fatalities involved speeding.•115 fatalities involved distracted driving.•122 fatalities involved unrestrained vehicle occupants.•103 motorcyclists were killed.•160 pedestrians and other active transportation users lost their lives, representing the third-highestannual total on record despite recent declines.While many traffic safety measures improved during 2024 and 2025, several areas remain concerning.Fatalities involving drivers age 70 and older increased for the second consecutive year, heavy truck-involved fatalities also increased in 2025, and active transportation fatalities continue to remainhistorically high. In addition, fatal crashes continue to occur statewide, with every county experiencing atleast one fatal crash during the previous three-year period.This project will fund coordinated High Visibility Enforcement mobilizations focused on impaired driving,speeding, distracted driving, occupant protection, motorcycle safety, and pedestrian and bicycle safety.Enforcement activities will be organized through local Target Zero Managers (TZMs), the statewide LawEnforcement Liaison (LEL) network, local Target Zero Task Forces, and the Washington State Patrol tomaximize visibility, improve interagency coordination, and reduce crashes caused by high-risk drivingbehaviors.3.1.2 Project Purpose and StrategiesThis project will fund High Visibility Enforcement (HVE) and Traffic Safety Enforcement Program (TSEP)patrols to prevent impaired driving, distracted driving, seat belt use, speeding, and motorcycle safety.High Visibility Enforcement (HVE) and Traffic Safety Enforcement Program (TSEP) patrols are designedto create deterrence by increasing the expectation of a citation/fine/arrest. Officers may also removehigh risk (impaired) drivers when encountered. So together, this countermeasure works by preventingdangerous driving behaviors and stopping those who still decide to engage in those behaviors.Funding and events will be organized by local TZMs, LELs, and their local Target Zero Task Force. Taskforces will use local data and professional judgement to determine enforcement priorities for theirjurisdictions and will schedule and plan enforcement and outreach activities.Regional participation in the following National Campaigns is mandatory:•Impaired driving enforcement during the Holiday DUI campaign (December 2026).•Distracted driving enforcement during the Distracted Driving campaign (April 2027)•Seat belt enforcement during the Click It or Ticket campaign (May 2027).•Impaired driving enforcement during the Summer DUI campaign (August 2027).These patrols will also be coordinated with the Washington State Patrol (WSP). Target Zero Managerswill establish or strengthen relationships with key WSP district personnel to improve interagencyPage 2 of 21October 6, 2026 E - 43 coordination with the WSP.3.1.3 Requirements for National Mobilizations and Traffic Safety Enforcement Program (TSEP)3.1.3.1.HVE events will be data informed; based on crash data, anecdotal evidence, and the professionaljudgement of task force members. WTSC strongly believes in the expertise of local officers to understandthe highest priority areas in their communities to focus their efforts.3.1.3.2.The SUB-RECIPIENT will ensure that all officers participating in these patrols are BAC certifiedand have received and passed the SFST training.3.1.3.3.SUB-RECIPIENT will ensure all officers participating in Impaired Driving patrols have receivedAdvanced Roadside Impaired Driving Enforcement (ARIDE) training.3.1.3.4.WTSC recommends that the SUB-RECIPIENT ensures that officers use TraCS to issue writtenwarnings instead of delivering them verbally. Recording each stop within the TraCS system not onlyformalizes the warning but also provides valuable information for future reference. This documentationallows subsequent officers to quickly review a driver’s prior interactions, fostering greater awareness andcontinuity in enforcement efforts. By maintaining this record, officers can make more informed decisionsduring future stops and contribute to a consistent approach in managing driver behavior.3.1.3.5.Impaired driving enforcement is a multifaceted process, requiring officers to recognize riskydriving behaviors, carry out thorough investigations, and handle arrests and processing efficiently. WTSCadvises that officers assigned to impaired driving HVE patrols should have completed at least 10 DUIarrests in the past two years. By setting this standard, WTSC ensures that participating officers possessthe necessary experience and skills to accurately identify and apprehend impaired drivers during thesespecialized patrols.3.1.3.6.SUB-RECIPIENT shall ensure all participating personnel will use the WEMS system provided bythe WTSC to record all activities in digital activity logs conducted by their commissioned officerspursuant to the HVE events. Participating officers will fill out all applicable fields of the digital activity logand use the comments field to provide details on irregularities, challenges or other details that would helpexplain what was encountered during their shift. SUB- RECIPIENT will also ensure all supervisors andfiscal staff have the ability to review and edit those activity logs.3.1.3.7.If an officer's contacts per hour rate falls below 2.0, the officer must provide a commentexplaining the circumstance. However, this requirement does not apply in cases where a DUI arrest hasbeen made.3.1.4 Project Intent and Best Practice3.1.4.1.SUB-RECIPIENT is encouraged to help their Region Task Force fulfill the requirement toparticipate in the four mandatory National Campaigns. (Holiday DUI campaign in December 2026,Distracted Driving campaign in April 2027, Click It or Ticket campaign in May 2027 and Summer DUIcampaign in August 2027).Page 3 of 21October 6, 2026 E - 44 NOTE: Agencies must participate in speed or impaired driving enforcement under this agreement to beeligible to receive funding under the WASPC equipment grant.3.1.4.2.SUB-RECIPIENT is strongly encouraged to participate in their task force to plan and executeenforcement events.3.1.4.3.Regional task force will be submitting quarterly progress reports and SUB-RECIPIENT isencouraged to participate to the fullest extent possible. Quarterly progress reports are due January 15,April 15, July 15, and October 15.3.1.4.4.WTSC encourages participating officers to prioritize violations that directly contribute to the injuryand death of road users, such as impaired driving, speeding, distracted driving, non-restraint, etc.3.1.4.5.SUB-RECIPIENT should promote patrol events through all earned, owned and, if funded, paidmedia that is available so that the public is made aware of the event before, during, and after theenforcement takes place. It is best practice to translate messages as needed and invite local mediainvolvement in the effort to reach communities in which HVE will occur.3.1.4.6.SUB-RECIPIENT should strive to actively enforce traffic safety laws focused on collision causingbehaviors in priority areas throughout the year outside of HVE events.3.1.4.7.When participating in motorcycle patrols SUB-RECIPIENT should focus on the illegal and unsafedriving actions of all motor vehicles interacting with motorcycles. This includes speeding, failure to yieldto a motorcycle, following too closely to a motorcycle, distracted driving, etc.3.1.4.8.When participating in motorcycle patrols SUB-RECIPIENT should ensure that enforcement willfocus on the illegal and unsafe driving actions of motorcycles that are known to cause serious and fatalcrashes. This includes impaired driving, speeding, and following too closely.3.1.4.9.Performance will be monitored by the regional TZM, LEL, and Task Force, as well as WTSC. WTSCreserves the right to designate specific officers as ineligible for cost reimbursement. This will occur if anofficer is determined to not have not met the purpose/intent of this grant in multiple emphasis patrols.3.1.4.10.Funds can be used to support the mentoring of officers in traffic enforcement. This can befocused on impaired driving, or general traffic enforcement.For DUI mentorship, WTSC has found it to be best practice to include a mix of instruction and practicalexperience. The mentor should be a DRE when possible, or a highly effective DUI emphasis patrol officerwith a minimum of ARIDE training. Mentor/mentee activities will be pre-approved by the TZM or LEL afterthe mentee submits their interest. Mentees are eligible to participate in impaired driving HVE patrolswithout ARIDE certification. Page 4 of 21October 6, 2026 E - 45 3.1.4.11.Community outreach/collaboration: Funds can be used to pay for traffic safety focusedcommunity outreach and collaboration activities. The operational approach for regional communityoutreach and collaboration activities should be developed at the Task Force level and be approved by theWTSC. WTSC recommends that these activities include an opportunity for the audience to providefeedback on local traffic safety priorities and activities, which ideally will influence the region's plan fortraffic safety programming.3.1.4.12.In order to receive funding from this grant, agencies must participate with the regional trafficsafety task force/coalition in the planning efforts for these activities.3.1.4.13.WTSC also encourages all law enforcement agencies in Washington to utilize WTSC's dataanalysis resources, such as interactive dashboards and data from a statewide attitudinal survey, as welltheir regional Target Zero Manager to identify priorities for engaging with the community.3.1.4.14.WTSC will provide tools for documenting community collaboration activities, such as the WEMSactivity log.3.1.5 NATIONAL AND STATE-WIDE MOBILIZATIONSNot all agencies are required to participate in all of the mobilizations listed below. However, the regionmust have some law enforcement participation in all of the mobilizations listed. Dates are tentative andmay change when NHTSA publishes their FFY2027 mobilization calendar.Mobilization Dates•Holiday DUI December 14, 2026 – January 3, 2027•Put the Phone Away or Pay April 5 – 12, 2027•Click It or Ticket May 17 – June 6, 2027•Ride Safe Ride On (optional if funded)July 2027 (Dates TBD)•DUI Drive Sober or Get Pulled Over August 11 – September 5, 20273.2 PROJECT GOALSPrevent traffic crashes to reduce traffic related deaths and serious injuries through active, visible,consistent, and targeted traffic law enforcement, law enforcement training, and community outreach. Lawenforcement can have a profound effect on traffic safety and this project aims to increase participationto accomplish that.3.3 COMPENSATION3.3.1 The Compensation for the straight time or overtime work provided in accordance with thisAgreement has been established under the terms of RCW 39.34. The cost of accomplishing the workdescribed in the SOW will not exceed dollar total from amounts listed below. Payment for satisfactoryperformance shall not exceed this amount unless the WTSC and SUB-RECIPIENT mutually agree to ahigher amount in a written Amendment to this Agreement executed by both the WTSC and SUB-RECIPIENT. Comp-time is not considered overtime and will not be approved for payment. All lawenforcement agencies who are active members of the Region’s traffic safety task force with a fullyPage 5 of 21October 6, 2026 E - 46 executed grant agreement are eligible to participate in this grant.3.3.2 WTSC will reimburse for personnel straight time or overtime expenses at 150 percent of theofficer’s normal salary rate plus SUB-RECIPIENT’s contributions to employee benefits, limited to thefollowing:•FICA•Medicare•Any portion of L&I that is paid by the employer (SUB-RECIPIENT)•Retirement contributions paid by the employer (SUB-RECIPIENT) can be included if the contribution isbased on a percentage of their hours worked.Health insurance, or any other benefits not listed above, are not eligible for reimbursement.The SUB-RECIPIENT will provide law enforcement officers with appropriate equipment (e.g., vehicles,radars, portable breath testers, etc.) to participate in the emphasis patrols.3.3.3 Funding alterations are permitted as follows: Upon agreement by the regional TZM and all otherparties impacted by a proposed budget alteration, the budget category amounts may be increased ordecreased without amending this agreement, so long as the total grant award amount does not increase.HVE grant funds should be managed collaboratively by the SUB-RECIPIENT and the TZM.These alterations must be requested through email communication between the regional TZM andassigned WTSC Program Manager. This communication shall include details of the requested budgetmodifications and a description of why these changes are needed. The TZM will also send an updatedquarterly Operations Plan to the WASPC representative monitoring the project if the budget modificationwill result in changes to the previously submitted plan.3.3.4 These funds, designated for salaries and benefits, are intended to pay for the hourly straight time orovertime costs and proportional amounts of fringe benefits of commissioned staff pursuing the activitiesdescribed in the statement of work. These funds may not be used for any other purpose for example anywork required to maintain a law enforcement commission including recertification trainings like firearmqualification. This agreement is expressly designated to fund salaries and benefits. By signing thisagreement, SUB-RECIPIENT agrees to supply all necessary equipment and vehicles needed to accomplishthe work in the scope of work. WTSC is not responsible for any equipment that is lost, stolen, ordestroyed in the execution of the scope of work.3.3.5 Dispatch: WTSC will reimburse communications officers/dispatch personnel for work on thisproject providing SUB- RECIPIENT has received prior approval from their region’s TZM. This activity mustbe overtime and only the expenses listed in section 3.2 and its subsections will be reimbursed.3.3.6 Transport Officers: WTSC will reimburse transport officers for their work on this project providingSUB-RECIPIENT has received approval from their regions TZM. The TZM will work with the regional LEL todetermine if need is warranted for the type of HVE activity. This activity must be overtime and only thePage 6 of 21October 6, 2026 E - 47 expenses listed in section 3.2 and its subsections will be reimbursed.3.3.7 The law enforcement agency involved will not schedule individual officer overtime shifts for longerthan eight hours. WTSC understands there may be instances when more than eight hours are billed dueto DUI processing or other reasons and an explanation should be provided on the WEMS Officer ActivityLog.3.3.8 The law enforcement agency involved will ensure that any reserve officer for whom reimbursementis claimed has exceeded his/her normal weekly working hours when participating in an emphasis patroland is authorized to be paid at the amount requested. Reserve officers may only be paid at the normalhourly rate and not at the 150 percent overtime rate.3.4 PROJECT COSTSThe WTSC has awarded $13,700.00 to the WTSC Region 1 Traffic Safety Task Force for the purpose ofconducting coordinated HVE enforcement and community outreach/collaboration activities. The fundingmust be used for traffic safety purposes in the areas of impaired driving, distracted driving, occupantrestraint use, speeding, and motorcycle safety. See the project in WEMS for an updated distribution offunding by specific emphasis area.By signing this agreement, the SUB-RECIPIENT can seek reimbursement for approved straight time orovertime expenses incurred as a participant in this grant. Funds are expressly designated for staffingactivities and may not be used for other expenses that may be incurred, such as vehicle damage, supplyreplacement, etc. All activity must be coordinated by the region’s traffic safety task force and TZM to beeligible for reimbursement.APPLICABLE STATE AND FEDERAL TERMS AND CONDITIONS:4.ACTIVITY REPORTSThe SUB-RECIPIENT agrees to have all personnel who work HVE patrols submit a WEMS Officer ActivityLog within 24 hours of the end of all shifts worked. These same logs will be associated with invoices asdetailed in the “BILLING PROCEDURE” section. Use of the Officer Activity Log in the WTSC’s online grantmanagement system, WEMS, is required. Supervisor review and accuracy certification will also be done inWEMS.5.ADVANCE PAYMENTS PROHIBITEDNo payments in advance of or in anticipation of goods or services to be provided under this Agreementshall be made by the WTSC.6.AGREEMENT ALTERATIONS AND AMENDMENTSThis Agreement may be amended by mutual agreement of the Parties in the form of a written request toamend this Agreement. Such amendments shall only be binding if they are in writing and signed bypersonnel authorized to bind each of the Parties. Changes to the budget, SUB-RECIPIENT’S PrimaryPage 7 of 21October 6, 2026 E - 48 Contact, and WTSC Program Manager can be made through email communication and signatures are notrequired.7.ALL WRITINGS CONTAINED HEREINThis Agreement contains all the terms and conditions agreed upon by the parties. No otherunderstandings, oral or otherwise, regarding the subject matter of this Agreement shall be deemed toexist or to bind any of the parties hereto.8.ASSIGNMENTThe SUB-RECIPIENT may not assign the work to be provided under this Agreement, in whole or in part,without the express prior written consent of the WTSC, which consent shall not be unreasonably withheld.The SUB-RECIPIENT shall provide the WTSC a copy of all third-party contracts and agreements enteredinto for purposes of fulfilling the SOW. Such third-party contracts and agreements must follow applicablefederal, state, and local law, including but not limited to procurement law, rules, and procedures. If any ofthe funds provided under this Agreement include funds from NHTSA, such third-party contracts andagreements must include the federal provisions set forth in this Agreement in sections 32 through 40.9.ATTORNEYS’ FEESIn the event of litigation or other action brought to enforce the Agreement terms, each party agrees tobear its own attorney fees and costs.10.BILLING PROCEDUREAll invoices for reimbursement of HVE activities will be done using the WTSC’s grant managementsystem, WEMS. WEMS Officer Activity logs will be attached to invoices, directly linking the cost of theactivity to the invoice. Because the activity, approval, and invoicing are all done within WEMS, no back updocumentation is required in most cases.Once submitted by the SUB-RECIPIENT, invoices are routed to the regional TZM for review and approval.The TZM will submit all approved invoices to the WTSC via WEMS within 10 days of receipt.Payment to the SUB-RECIPIENT for approved and completed work will be made by warrant or accounttransfer by WTSC within 30 days of receipt of such properly documented invoices acceptable to WTSC.Upon expiration of the Agreement, any claim for payment not already made shall be submitted within 45days after the expiration date of this Agreement. All invoices for goods received or services performed onor prior to June 30, 2027, must be received by WTSC no later than August 10, 2027. All invoices for goodsreceived or services performed between July 1, 2027 and September 30, 2027, must be received by WTSCno later than November 15, 2027.11.CONFIDENTIALITY / SAFEGUARDING OF INFORMATIONThe SUB-RECIPIENT shall not use or disclose any information concerning the WTSC, or information whichmay be classified as confidential, for any purpose not directly connected with the administration of thisPage 8 of 21October 6, 2026 E - 49 Agreement, except with prior written consent of the WTSC, or as may be required by law.12.COST PRINCIPLESCosts incurred under this Agreement shall adhere to provisions of 2 CFR Part 200 Subpart E.13.COVENANT AGAINST CONTINGENT FEESThe SUB-RECIPIENT warrants that it has not paid, and agrees not to pay, any bonus, commission,brokerage, or contingent fee to solicit or secure this Agreement or to obtain approval of any applicationfor federal financial assistance for this Agreement. The WTSC shall have the right, in the event of breachof this section by the SUB-RECIPIENT, to annul this Agreement without liability.14.DISPUTES14.1.Disputes arising in the performance of this Agreement, which are not resolved by agreement of theparties, shall be decided in writing by the WTSC Deputy Director or designee. This decision shall be finaland conclusive, unless within 10 days from the date of the SUB-RECIPIENT’s receipt of WTSC’s writtendecision, the SUB-RECIPIENT furnishes a written appeal to the WTSC Director. The SUB-RECIPIENT’sappeal shall be decided in writing by the Director or designee within 30 days of receipt of the appeal bythe Director. The decision shall be binding upon the SUB-RECIPIENT and the SUB-RECIPIENT shall abideby the decision.14.2.Performance During Dispute. Unless otherwise directed by WTSC, the SUB-RECIPIENT shallcontinue performance under this Agreement while matters in dispute are being resolved.14.3 In the event that either Party deems it necessary to institute legal action or proceedings to enforceany right or obligation under this Agreement, the Parties hereto agree that any such action or proceedingsshall be brought in the superior court situated in Thurston County, Washington.15.GOVERNANCE15.1.This Agreement is entered into pursuant to and under the authority granted by the laws of the stateof Washington and any applicable federal laws. The provisions of this Agreement shall be construed toconform to those laws.15.2.In the event of an inconsistency in the terms of this Agreement, or between its terms and anyapplicable statute or rule, the inconsistency shall be resolved by giving precedence in the following order:15.2.1.Applicable federal and state statutes and rules15.2.2.Terms and Conditions of this Agreement15.2.3.Any Amendment executed under this Agreement15.2.4.Any SOW executed under this Agreement Page 9 of 21October 6, 2026 E - 50 15.2.5.Any other provisions of the Agreement, including materials incorporated by reference16.INCOMEAny income earned by the SUB-RECIPIENT from the conduct of the SOW (e.g., sale of publications,registration fees, or service charges) must be accounted for, reported to WTSC, and that income must beapplied to project purposes or used to reduce project costs.17.INDEMNIFICATION17.1.To the fullest extent permitted by law, the SUB-RECIPIENT shall indemnify and hold harmless theWTSC, its officers, employees, and agents, and process and defend at its own expense any and all claims,demands, suits at law or equity, actions, penalties, losses, damages, or costs of whatsoever kind(“claims”) brought against WTSC arising out of or in connection with this Agreement and/or the SUB-RECIPIENT’s performance or failure to perform any aspect of the Agreement. This indemnity provisionapplies to all claims against WTSC, its officers, employees, and agents arising out of, in connection with,or incident to the acts or omissions of the SUB-RECIPIENT, its officers, employees, agents, contractors,and subcontractors. Provided, however, that nothing herein shall require the SUB-RECIPIENT to indemnifyand hold harmless or defend the WTSC, its agents, employees, or officers to the extent that claims arecaused by the negligent acts or omissions of the WTSC, its officers, employees or agents; and providedfurther that if such claims result from the concurrent negligence of:(a) the SUB-RECIPIENT, its officers, employees, agents, contractors, or subcontractors, and(b) the WTSC, its officers, employees, or agents, or involves those actions covered by RCW 4.24.115, theindemnity provisions provided herein shall be valid and enforceable only to the extent of the negligence ofthe SUB- RECIPIENT, its officers, employees, agents, contractors, or subcontractors.17.2.The SUB-RECIPIENT agrees that its obligations under this Section extend to any claim, demandand/or cause of action brought by, or on behalf of, any of its employees or agents in the performance ofthis agreement. For this purpose, the SUB- RECIPIENT, by mutual negotiation, hereby waives with respectto WTSC only, any immunity that would otherwise be available to it against such claims under theIndustrial Insurance provisions chapter 51.12 RCW.17.3.The indemnification and hold harmless provision shall survive termination of this Agreement.18.INDEPENDENT CAPACITYThe employees or agents of each party who are engaged in the performance of this Agreement shallcontinue to be employees or agents of that party and shall not be considered for any purpose to beemployees or agents of the other party.19.INSURANCE COVERAGE19.1.The SUB-RECIPIENT shall comply with the provisions of Title 51 RCW, Industrial Insurance, ifrequired by law.19.2.If the SUB-RECIPIENT is not required to maintain insurance in accordance with Title 51 RCW, prior toPage 10 of 21October 6, 2026 E - 51 the start of any performance of work under this Agreement, the SUB-RECIPIENT shall provide WTSC withproof of insurance coverage (e.g., vehicle liability insurance, private property liability insurance, orcommercial property liability insurance), as determined appropriate by WTSC, which protects the SUB-RECIPIENT and WTSC from risks associated with executing the SOW associated with this Agreement.20.LICENSING, ACCREDITATION, AND REGISTRATIONThe SUB-RECIPIENT shall comply with all applicable local, state, and federal licensing, accreditation, andregistration requirements and standards necessary for the performance of this Agreement. The SUB-RECIPIENT shall complete registration with the Washington State Department of Revenue, if required, andbe responsible for payment of all taxes due on payments made under this Agreement.21.RECORDS MAINTENANCE21.1.During the term of this Agreement and for six years thereafter, the SUB-RECIPIENT shall maintainbooks, records, documents, and other evidence that sufficiently and properly reflect all direct and indirectcosts expended in the performance of the services described herein. These records shall be subject toinspection, review, or audit by authorized personnel of the WTSC, the Office of the State Auditor, andfederal officials so authorized by law. All books, records, documents, and other material relevant to thisAgreement will be retained for six years after expiration. The Office of the State Auditor, federal auditors,the WTSC, and any duly authorized representatives shall have full access and the right to examine any ofthese materials during this period.21.2.Records and other documents, in any medium, furnished by one party to this Agreement to the otherparty, will remain the property of the furnishing party, unless otherwise agreed. The receiving party will notdisclose or make available this material to any third parties without first giving notice to the furnishingparty and giving them a reasonable opportunity to respond. Each party will utilize reasonable securityprocedures and protections to assure that records and documents provided by the other party are noterroneously disclosed to third parties.22.RIGHT OF INSPECTIONThe SUB-RECIPIENT shall provide right of access to its facilities to the WTSC or any of its officers, or toany other authorized agent or official of the state of Washington or the federal government, at allreasonable times, in order to monitor and evaluate performance, compliance, and/or quality assuranceunder this Agreement. The SUB-RECIPIENT shall make available information necessary for WTSC tocomply with the right to access, amend, and receive an accounting of disclosures of their PersonalInformation according to the Health Insurance Portability and Accountability Act of 1996 (HIPAA) or anyregulations enacted or revised pursuant to the HIPAA provisions and applicable provisions of WashingtonState law. The SUB- RECIPIENT shall upon request make available to the WTSC and the United StatesSecretary of the Department of Health and Human Services all internal policies and procedures, books,and records relating to the safeguarding, use, and disclosure of Personal Information obtained or used asa result of this Agreement.23.RIGHTS IN DATA23.1.WTSC and SUB-RECIPIENT agree that all data and work products (collectively called “WorkPage 11 of 21October 6, 2026 E - 52 Product”) pursuant to this Agreement shall be considered works made for hire under the U.S. CopyrightAct, 17 USC §101 et seq., and shall be owned by the state of Washington. Work Product includes, but isnot limited to, reports, documents, pamphlets, advertisement, books, magazines, surveys, studies,computer programs, films, tapes, sound reproductions, designs, plans, diagrams, drawings, software,and/or databases to the extent provided by law. Ownership includes the right to copyright, register thecopyright, distribute, prepare derivative works, publicly perform, publicly display, and the ability tootherwise use and transfer these rights.23.2.If for any reason the Work Product would not be considered a work made for hire under applicablelaw, the SUB- RECIPIENT assigns and transfers to WTSC the entire right, title, and interest in and to allrights in the Work Product and any registrations and copyright applications relating thereto and anyrenewals and extensions thereof.23.3.The SUB-RECIPIENT may publish, at its own expense, the results of project activities without priorreview by the WTSC, provided that any publications (written, visual, or sound) contain acknowledgment ofthe support provided by NHTSA and the WTSC. Any discovery or invention derived from work performedunder this project shall be referred to the WTSC, who will determine through NHTSA whether patentprotections will be sought, how any rights will be administered, and other actions required to protect thepublic interest.24.SAVINGSIn the event funding from state, federal, or other sources is withdrawn, reduced, or limited in any way afterthe effective date of this Agreement and prior to completion of the SOW under this Agreement, the WTSCmay terminate the Agreement under the "TERMINATION FOR CONVENIENCE" clause, without the 30-daynotice requirement. The Agreement is subject to renegotiation at the WTSC’s discretion under any newfunding limitations or conditions.25.SEVERABILITYIf any provision of this Agreement or any provision of any document incorporated by reference shall beheld invalid, such invalidity shall not affect the other provisions of this Agreement which can be giveneffect without the invalid provision, if such remainder conforms to the requirements of applicable law andthe fundamental purpose of this Agreement, and to this end the provisions of this Agreement aredeclared to be severable.26.SITE SECURITYWhile on WTSC premises, the SUB-RECIPIENT, its agents, employees, or sub-contractors shall conform inall respects with all WTSC physical, fire, or other security policies and applicable regulations.27.TAXESAll payments of payroll taxes, unemployment contributions, any other taxes, insurance, or other suchexpenses for the SUB- RECIPIENT or its staff shall be the sole responsibility of the SUB-RECIPIENT. Page 12 of 21October 6, 2026 E - 53 28.TERMINATION FOR CAUSEIf the SUB-RECIPIENT does not fulfill in a timely and proper manner its obligations under this Agreementor violates any of these terms and conditions, the WTSC will give the SUB-RECIPIENT written notice ofsuch failure or violation, and may terminate this Agreement immediately. At the WTSC’s discretion, theSUB-RECIPIENT may be given 15 days to correct the violation or failure. In the event that the SUB-RECIPIENT is given the opportunity to correct the violation and the violation is not corrected within the 15-day period, this Agreement may be terminated at the end of that period by written notice of the WTSC.29.TERMINATION FOR CONVENIENCEExcept as otherwise provided in this Agreement, either party may terminate this Agreement, withoutcause or reason, with 30 days written notice to the other party. If this Agreement is so terminated, theWTSC shall be liable only for payment required under the terms of this Agreement for services renderedor goods delivered prior to the effective date of termination.30.TREATMENT OF ASSETS30.1.Title to all property furnished by the WTSC shall remain property of the WTSC. Title to all propertyfurnished by the SUB- RECIPIENT for the cost of which the SUB-RECIPIENT is entitled to be reimbursed asa direct item of cost under this Agreement shall pass to and vest in the WTSC upon delivery of suchproperty by the SUB-RECIPIENT. Title to other property, the cost of which is reimbursable to the SUB-RECIPIENT under this Agreement, shall pass to and vest in the WTSC upon (i) issuance for use of suchproperty in the performance of this Agreement, or (ii) commencement of use of such property in theperformance of this Agreement, or (iii) reimbursement of the cost thereof by the WTSC in whole or in part,whichever first occurs.30.2.Any property of the WTSC furnished to the SUB-RECIPIENT shall, unless otherwise provided hereinor approved by the WTSC, be used only for the performance of this Agreement.30.3.The SUB-RECIPIENT shall be responsible for any loss or damage to property of the WTSC whichresults from the negligence of the SUB-RECIPIENT or which results from the failure on the part of theSUB-RECIPIENT to maintain and administer that property in accordance with sound managementpractices.30.4.If any WTSC property is lost, destroyed, or damaged, the SUB-RECIPIENT shall immediately notifythe WTSC and shall take all reasonable steps to protect the property from further damage.30.5.The SUB-RECIPIENT shall surrender to the WTSC all property of the WTSC upon completion,termination, or cancellation of this Agreement.30.6.All reference to the SUB-RECIPIENT under this clause shall also include SUB-RECIPIENT'semployees, agents, or sub- contractors.31.WAIVERA failure by either party to exercise its rights under this Agreement shall not preclude that party fromPage 13 of 21October 6, 2026 E - 54 subsequent exercise of such rights and shall not constitute a waiver of any other rights under thisAgreement.APPLICABLE CERTIFICATIONS AND ASSURANCES FOR HIGHWAY SAFETY GRANTS (23 CFR PART 1300APPENDIX A):In all future references to sub-recipients, the term "SUB-RECIPIENT" shall also apply to its agents,employees, sub-contractors, and other participants of Federal financial assistance under such program.SUB-RECIPIENT, its agents, employees, sub-contractors, and other participants will comply with allrequirements imposed or pursuant to the Acts, the Regulations, and this Assurance.32.FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA)In accordance with FFATA, the SUB-RECIPIENT shall, upon request, provide WTSC the names and totalcompensation of the five most highly compensated officers of the entity, if the entity in the precedingfiscal year received 80 percent or more of its annual gross revenues in federal awards, received$25,000,000 or more in annual gross revenues from federal awards, and if the public does not haveaccess to information about the compensation of the senior executives of the entity through periodicreports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 or section 6104 of theInternal Revenue Code of 1986.33.FEDERAL NONDISCRIMINATION (Title VI, 42 U.S.C. § 2000d et seq.)Instructions for Lower Tier Certification33.1.By signing this Agreement, the SUB-RECIPIENT (hereinafter in this section referred to as the “lowertier participant”) is providing the certification set out below and agrees to comply with the requirementsof 2 CFR part 180 and 23 CFR part 1200.33.2.The certification in this section is a material representation of fact upon which reliance was placedwhen this transaction was entered into. If it is later determined that the lower tier participant knowinglyrendered an erroneous certification, in addition to other remedies available to the federal government, thedepartment or agency with which this transaction originated may pursue available remedies, includingsuspension and/or debarment.33.3.The lower tier participant shall provide immediate written notice to the WTSC if at any time thelower tier participant learns that its certification was erroneous when submitted or has become erroneousby reason of changed circumstances.33.4.The terms covered transaction, civil judgement, debarment, suspension, ineligible, participant,person, principal, and voluntarily excluded, as used in this clause, are defined in 2 CFR parts 180 and1200.33.5.The lower tier participant agrees by signing this Agreement that it shall not knowingly enter into anylower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpartPage 14 of 21October 6, 2026 E - 55 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this coveredtransaction, unless authorized by WTSC.33.6.The lower tier participant further agrees by signing this Agreement that it will include the clausetitled “Instructions for Lower Tier Certification” including the “Certification Regarding Debarment,Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transaction,” without modification,in all lower tier covered transactions and in all solicitations for lower tier covered transactions, and willrequire lower tier participants to comply with 2 CFR part 180 and 23 CFR part 1200.33.7.A participant in a covered transaction may rely upon a certification of a prospective participant in alower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4,debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows thatthe certification is erroneous. A participant is responsible for ensuring that its principals are notsuspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibilityof its principals, as well as the eligibility of any prospective lower tier participants, each participant may,but is not required to, check the System for Award Management Exclusions website(https://www.sam.gov/).33.8.Nothing contained in the foregoing shall be construed to require establishment of a system ofrecords in order to render in good faith the certification required by this clause. The knowledge andinformation of a participant is not required to exceed that which is normally possessed by a prudentperson in the ordinary course of business dealings.33.9.Except for transactions authorized under paragraph 33.5. of these instructions, if a participant in acovered transaction knowingly enters into a lower tier covered transaction with a person who is proposedfor debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excludedfrom participation in this transaction, in addition to other remedies available to the Federal government,the department or agency with which this transaction originated may pursue available remedies, includingsuspension or debarment.Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier CoveredTransactions33.10.The lower tier participant certifies, by signing this Agreement, that neither it nor its principals arepresently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded fromparticipation in this transaction by any federal department or agency.33.11.Where the lower tier participant is unable to certify to any of the statements in this certification,such participant shall attach an explanation to this Agreement.34.THE DRUG-FREE WORKPLACE ACT OF 1988 (41 U.S.C. 8103)34.1.The SUB-RECIPIENT shall: Page 15 of 21October 6, 2026 E - 56 34.1.1.Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing,possession, or use of a controlled substance is prohibited in the SUB-RECIPIENT’s workplace, and shallspecify the actions that will be taken against employees for violation of such prohibition.34.1.2.Establish a drug-free awareness program to inform employees about the dangers of drug abuse inthe workplace; the SUB- RECIPIENT’s policy of maintaining a drug-free workplace; any available drugcounseling, rehabilitation, and employee assistance programs; and the penalties that may be imposedupon employees for drug violations occurring in the workplace.34.1.3.Make it a requirement that each employee engaged in the performance of the grant be given acopy of the statement required by paragraph 34.1.1. of this section.34.1.4.Notify the employee in the statement required by paragraph 34.1.1. of this section that, as acondition of employment under the grant, the employee will abide by the terms of the statement, notifythe employer of any criminal drug statute conviction for a violation occurring in the workplace no laterthan five days after such conviction, and notify the WTSC within 10 days after receiving notice from anemployee or otherwise receiving actual notice of such conviction.34.1.5.Take one of the following actions within 30 days of receiving notice under paragraph 34.1.3. ofthis section, with respect to any employee who is so convicted: take appropriate personnel action againstsuch an employee, up to and including termination, and/or require such employee to participatesatisfactorily in a drug abuse assistance or rehabilitation program approved for such purposes by afederal, state, or local health, law enforcement, or other appropriate agency.34.1.6.Make a good faith effort to continue to maintain a drug-free workplace through implementation ofall of the paragraphs above.35.FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA)In accordance with FFATA, the SUB-RECIPIENT shall, upon request, provide WTSC the names and totalcompensation of the five most highly compensated officers of the entity, if the entity in the precedingfiscal year received 80 percent or more of its annual gross revenues in federal awards, received$25,000,000 or more in annual gross revenues from federal awards, and if the public does not haveaccess to information about the compensation of the senior executives of the entity through periodicreports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 or section 6104 of theInternal Revenue Code of 1986.36.FEDERAL LOBBYING36.1.The undersigned certifies, to the best of his or her knowledge and belief, that:36.1.1.No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned,to any person for influencing or attempting to influence an officer or employee of any agency, a Memberof Congress, an officer or employee of Congress, or an employee of a Member of Congress in connectionwith the awarding of any federal contract, the making of any federal grant, the making of any federal loan,Page 16 of 21October 6, 2026 E - 57 the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, ormodification of any federal contract, grant, loan, or cooperative agreement.36.1.2.If any funds other than federal appropriated funds have been paid or will be paid to any person forinfluencing or attempting to influence an officer or employee of any agency, a Member of Congress, anofficer or employee of Congress, or an employee of a Member of Congress in connection with this federalcontract, grant, loan, or cooperative agreement, the undersigned shall complete and submit StandardForm-LLL, Disclosure Form to Report Lobbying, in accordance with its instructions.36.1.3.The undersigned shall require that the language of this certification be included in the awarddocuments for all sub- awards at all tiers (including sub-contracts, sub-grants, and contracts under grant,loans, and cooperative agreements), and that all sub- recipients shall certify and disclose accordingly.36.2.This certification is a material representation of fact upon which reliance was placed when thistransaction was made or entered into. Submission of this certification is a prerequisite for making orentering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to filethe required certification shall be subject to a civil penalty of not less than $10,000 and not more than$100,000 for each such failure.37.FEDERAL NONDISCRIMINATION (Title VI, 42 U.S.C. § 2000d et seq.)37.1.The State highway safety agency [and its SUB-RECIPIENTs] will comply with all Federal statutes andimplementing regulations relating to nondiscrimination (“Federal Nondiscrimination Authorities”). Theseinclude but are not limited to:37.1.1.Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq., 78 stat. 252), (prohibitsdiscrimination on the basis of race, color, national origin);37.1.2.49 CFR part 21 (entitled Non-discrimination in Federally-Assisted Programs of the Department ofTransportation—Effectuation of Title VI of the Civil Rights Act of 1964);37.1.3.28 CFR section 50.3 (U.S. Department of Justice Guidelines for Enforcement of Title VI of the CivilRights Act of 1964);37.1.4.The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C.4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because ofFederal or Federal-aid programs and projects);37.1.5.Federal-Aid Highway Act of 1973, (23 U.S.C. 324 et seq.), and Title IX of the EducationAmendments of 1972, as amended (20 U.S.C. 1681-1683 and 1685-1686) (prohibit discrimination on thebasis of sex);37.1.6.Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. 794 et seq.), as amended, (prohibitsdiscrimination on the basis of disability) and 49 CFR part 27;Page 17 of 21October 6, 2026 E - 58 37.1.7.The Age Discrimination Act of 1975, as amended, (42 U.S.C. 6101 et seq.), (prohibitsdiscrimination on the basis of age);37.1.8.The Civil Rights Restoration Act of 1987, (Pub. L. 100-209), (broadens scope, coverage andapplicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" toinclude all of the programs or activities of the Federal aid SUB-RECIPIENTs, subrecipients andcontractors, whether such programs or activities are Federally-funded or not);37.1.9.Titles II and III of the Americans with Disabilities Act (42 U.S.C. 12131-12189) (prohibitsdiscrimination on the basis of disability in the operation of public entities, public and privatetransportation systems, places of public accommodation, and certain testing) and 49 CFR parts 37 and38;During the performance of this contract/funding agreement, the SUB-RECIPIENT agrees:37.1.10.To comply with all Federal nondiscrimination laws and regulations, as may be amended fromtime to time;37.1.11.Not to participate directly or indirectly in the discrimination prohibited by any Federal non-discrimination law or regulation, as set forth in Appendix B of 49 CFR part 2l and herein;37.1.12.To permit access to its books, records, accounts, other sources of information, and its facilitiesas required by the State highway safety office, US DOT or NHTSA;37.1.13.That, in event a SUB-RECIPIENT fails to comply with any nondiscrimination provisions in thiscontract/funding agreement, the State highway safety agency will have the right to impose suchcontract/agreement sanctions as it or NHTSA determine are appropriate, including but not limited towithholding payments to the SUB-RECIPIENT/funding recipient under the contract/agreement until theSUB-RECIPIENT/funding recipient complies; and/or cancelling, terminating, or suspending a contract orfunding agreement, in whole or in part; and37.1.14.To insert this clause, including paragraphs a through e, in every subcontract and subagreementand in every solicitation for a subcontract or sub-agreement, that receives Federal funds under thisprogram.38.POLITICAL ACTIVITY (HATCH ACT)The SUB-RECIPIENT will comply with provisions of the Hatch Act (5 U.S.C. 1501-1508), which limit thepolitical activities of employees whose principal employment activities are funded in whole or in part withfederal funds.39.PROHIBITION ON USING GRANT FUNDS TO CHECK FOR HELMET USAGE Page 18 of 21October 6, 2026 E - 59 The SUB-RECIPIENT will not use 23 U.S.C. Chapter 4 grant funds for programs to check helmet usage orto create checkpoints that specifically target motorcyclists. This Agreement does not include any aspectsor elements of helmet usage or checkpoints, and so fully complies with this requirement.40.STATE LOBBYINGNone of the funds under this Agreement will be used for any activity specifically designed to urge orinfluence a state or local legislator to favor or oppose the adoption of any specific legislative proposalpending before any state or local legislative body. Such activities include both direct and indirect (e.g.,“grassroots”) lobbying activities, with one exception. This does not preclude a state official whose salaryis supported with NHTSA funds from engaging in direct communications with state or local legislativeofficials, in accordance with customary state practice, even if such communications urge legislativeofficials to favor or oppose the adoption of a specific pending legislative proposal.41.CERTIFICATION ON CONFLICT OF INTERESTGENERAL REQUIREMENTS41.1.No employee, officer or agent of the SUB-RECIPIENT who is authorized in an official capacity tonegotiate, make, accept or approve, or to take part in negotiating, making, accepting or approving anysubaward, including contracts or subcontracts, in connection with this grant shall have, directly orindirectly, any financial or personal interest in any such subaward. Such a financial or personal interestwould arise when the employee, officer, or agent, any member of his or her immediate family, his or herpartner, or an organization which employs or is about to employ any of the parties indicated herein, has afinancial or personal interest in or a tangible personal benefit from an entity considered for a subaward.41.2.Based on this policy:41.2.1.The SUB-RECIPIENT shall maintain a written code or standards of conduct that provide fordisciplinary actions to be applied for violations of such standards by officers, employees, or agents. Thecode or standards shall provide that the SUB- RECIPIENT’s officers, employees, or agents may neithersolicit nor accept gratuities, favors, or anything of monetary value from present or potential sub-awardees, including contractors or parties to subcontracts and establish penalties, sanctions or otherdisciplinary actions for violations, as permitted by State or local law or regulation.41.2.2.The SUB-RECIPIENT shall maintain responsibility to enforce the requirements of the written codeor standards of conduct.DISCLOSURE REQUIREMENTS41.3.No SUB-RECIPIENT, including its officers, employees or agents, shall perform or continue toperform under a grant or cooperative agreement, whose objectivity may be impaired because of anyrelated past, present, or currently planned interest, financial or otherwise, in organizations regulated byNHTSA or in organizations whose interests may be substantially affected by NHTSA activities.41.3.1.The SUB-RECIPIENT shall disclose any conflict of interest identified as soon as reasonablypossible, making an immediate and full disclosure in writing to WTSC. The disclosure shall include aPage 19 of 21October 6, 2026 E - 60 description of the action which the recipient has taken or proposes to take to avoid or mitigate suchconflict.41.3.2.NHTSA will review the disclosure and may require additional relevant information from therecipient. If a conflict of interest is found to exist, NHTSA may (a) terminate the award, or (b) determinethat it is otherwise in the best interest of NHTSA to continue the award and include appropriateprovisions to mitigate or avoid such conflict.41.3.3.Conflicts of interest that require disclosure include all past, present or currently plannedorganizational, financial, contractual or other interest(s) with an organization regulated by NHTSA or withan organization whose interests may be substantially affected by NHTSA activities, and which are relatedto this award. The interest(s) that require disclosure include those of any SUB-RECIPIENT, affiliate,proposed consultant, proposed subcontractor and key personnel of any of the above. Past interest shallbe limited to within one year of the date of award. Key personnel shall include any person owning morethan a 20 percent interest in a SUB-RECIPIENT, and the officers, employees or agents of a recipient whoare responsible for making a decision or taking an action under an award where the decision or actioncan have an economic or other impact on the interests of a regulated or affected organization.42.DESIGNATED CONTACTSThe following named individuals will serve as designated contacts for each of the parties for allcommunications, notices, and reimbursements regarding this Agreement:  The Contact for the SUB- RECIPIENT is:The Contact for WTSC is:Jason JonesAccountantjjones@cityofpa.us360-417-4606 Mark MedalenWTSC Program Managermmedalen@wtsc.wa.gov360-725-9878 AUTHORITY TO SIGNThe undersigned acknowledge that they are authorized to execute this Agreement and bind theirrespective agencies or entities to the obligations set forth herein.IN WITNESS WHEREOF, the parties have executed this Agreement.SUB-RECIPIENT: Page 20 of 21October 6, 2026 E - 61 ______________________________Signature  ______________________________Printed Name ______________________________Title ______________________________Date WASHINGTON TRAFFIC SAFETY COMMISSIONName: Mark MedalenTitle: Program Manager  ______________________________Date Page 21 of 21October 6, 2026 E - 62 Grant Requirements Acknowledgment Form for High Visibility Enforcement (HVE) Mobilizations WEMS ID: 2027-HVE-6073-Region 1 HVE Before beginning work on this grant project, the Sub-recipient's representative should thoroughly read and understand the terms of the Inter-agency Agreement (IAA). This Grant Requirements Acknowledgment Form provides an explanation of some key terms and highlights but is not comprehensive. If the Sub-recipient's representative has questions after reviewing this document, please refer to the WTSC Grants Management Manual, or contact the WTSC Program Manager assigned to this grant. When you, the Sub-recipient's representative, agree to this document, you certify that you understand the grant requirements and agree to fully comply with the terms and conditions set forth in the Agreement/Contract, as well as additional federal requirements outlined in the Code of Federal Regulations for Federal Grants and Agreements, as referenced below. If anything in this document conflicts with the Agreement/Contract, the Agreement/Contract takes precedence. Before you begin work, you must have: • A fully executed IAA or contract signed by both parties. • Attested to the Grant Requirements Acknowledgment Form (this document). Work cannot begin before the start date on the IAA, or before the IAA is signed by all parties. WTSC will only reimburse expenses incurred after the IAA is fully executed. Select Contract Provisions: • Statement of Work: This summarizes the work to be done for this grant. If this changes significantly, the grantee will need to request a change in WEMS, and an IAA amendment may be required. • High Visibility Enforcement (HVE) Best Practices: The specific HVE requirements listed in the Scope of Work are extremely important to the success of the high visibility enforcement strategy. ALL of these requirements must be followed. • WEMS Digital Activity Log: WTSC requires all agencies participating in high visibility enforcement to use the WEMS system to document the activity of all participating officers. An officer cannot participate if they do not have a WEMS account and do not input their activities into the WEMS digital activity log. • Officer Training Requirements: Any participating officer must document in WEMS that they have current qualifications for BAC and SFST. • Period of Performance: All work must be completed, and goods and services must be received, during the period of performance on the IAA. October 6, 2026 E - 63 • Compensation: o Comp time is not an allowable expense for reimbursement on a high visibility enforcement (HVE) campaign contract or other OT (Overtime) patrol projects. The funding for these types of projects are for the actual activity of patrolling and comp time or any other type of leave will not be reimbursed. o All expenses must be incurred during the period of performance on the IAA. o Expenses cannot exceed the total amount of the agreement and must fall within the amounts of each budget category as listed in the IAA. o Funds may be moved, with prior approval and within certain limits, between planned budget categories. A formal request must be submitted to the Target Zero Manager. • Advance Payments Prohibited: WTSC cannot pay for any costs prior to the work being completed or the goods being delivered. • Agreement Alterations and Amendments: If your agency wants to seek an exception to any of the HVE operational requirements, you must submit an exception request to the WTSC’s primary contact listed in the in Interagency Agreement. • Billing Procedure: Your agency is required to utilize the Digital Activity Log in the WEMS system, supplied by the WTSC for all of your invoices. Your local TZM can give you training and support if you need assistance using this system. • Buy America Act: For any manufactured goods over $10,000, the grantee must provide written certification that the goods, including IT software and hardware, were produced in the USA. • Cost Principles: Grantee cannot use grant funds to replace routine and/or existing staff or expenditures. Must comply with 2 CFR Part 200 Subpart E. • Income: Any income generated with this grant must be accounted for and applied to project purposes or used to reduce project costs. • Lobbying/Political Activity: Because this grant uses federal funds, no work being funded by this grant can be used to lobby or otherwise influence state or federal officials, or support or oppose legislation; there is an allowance for “customary state practice.” • Records Maintenance: Maintain records pertaining to this agreement for 6 years after expiration Other Requirements: • Promotional Item Purchase Restrictions: No promotional items can be purchased with these grant funds. • Single Audit Requirements: Required of an entity that expends $750,000 or more annually of federal funds, federal grants, or federal awards; usually performed annually. October 6, 2026 E - 64 By checking this box and typing your name below, you certify that you agree to fully comply with the terms and conditions set forth in the Agreement, as well as the requirements listed in this document. Typing your name below constitutes your electronic signature on this document. Name: Title: Agency: Date: October 6, 2026 E - 65 Date: October 6, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Pacific Salmon Commission – Southern Fund Grant Acceptance: Ennis Creek Fish Barrier Removal (GG0119) Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Additionally, this project furthers the City’s goals through the approved 2027-2032 Capital Facilities Plan under project GG0119. Background / Analysis: In partnership with the Lower Elwha Klallam Tribe, the City has collaborated in submitting proposals for funding to remove the last unfunded fish passage barriers on Ennis Creek to restore habitat and significantly improve salmon runs. This project will also improve access to the City’s Wastewater Treatment Plant and area residents. The City was successful in obtaining $300,000 in PSC Southern Fund grant funding for construction activities. This project includes the removal of a double barrel fish barrier culvert and replacement of the bridge to meet Washington State fish passage standards. The Ennis Creek Fish Barrier Removal Project GG0119 is assigned first priority of General Government Projects in the approved 2027-2032 Capital Facilities Plan & Transportation Improvement Plan. The project design is fully funded and is expected to be completed by December 2026. Funding Overview: The City was successful in obtaining grant funding from the Pacific Salmon Commission (PSC) Southern Fund Committee in the amount of $300,000 toward construction of the Ennis Creek Fish Barrier Removal project GG0119. There are no cost share requirements under the conditions of this award. Other construction funding secured includes a grant in the amount of $1,402,396 awarded to the Lower Elwha Klallam Tribe through the NOAA Restoring Tribal Priority Fish Passage through Barrier Removal program. The Engineer’s cost estimate for this project is $2,345,000. Attachment(s): Pacific Salmon Commission Grant Agreement - Draft Summary: Staff is seeking City Council approval to accept grant funding from the Pacific Salmon Commission (PSC) Southern Fund Committee in the amount of $300,000. An agreement with PSC is required to obligate the funding. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Funding: The City was successful in obtaining grant funding from the Pacific Salmon Commission (PSC) Southern Fund Committee in the amount of $300,000 for construction activities. The engineer’s cost estimate at 90% design for the Ennis Creek Fish Barrier Removal project GG0119 is $2,345,000. Recommendation: 1) Accept the Pacific Salmon Commission Southern Fund grant in the amount of $300,000; and 2) authorize the City Manager to execute all grant-related documents, to administer the grant, and to make minor modifications as necessary. October 6, 2026 E - 66 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 1 of 11 GRANT AGREEMENT THIS AGREEMENT dated 25th day of September, 2026 BETWEEN: PACIFIC SALMON COMMISSION, a legal body created by the Treaty between the Government of Canada and the Government of the United States of America and having its head office at: Suite 600, 1155 Robson Street, Vancouver, B.C., V6E 1B5. (the “Commission”) And CITY OF PORT ANGELES, having an Employer Identification Number (EIN) 91-6001266 and having an office at 321 E 5th St, Port Angeles, WA, 98362. (the “Grantee”) WHEREAS, the Commission wishes to provide the Grant, that is not to exceed $300,000.00 USD, to support the Grantee for the purposes of the Ennis Creek Fish Barrier Removal described in more detail in Schedule A and in exchange for the Grant, the Grantee accepts the terms and conditions described in this Agreement. 1. DEFINITIONS 1.01 The following terms shall have the following meaning: “Accountable Advance” means money advanced to the Grantee in accordance with this Agreement. “Assets” means capital items that are purchased by the Grantee, that have an initial cost of $10,000 or more which will not be fully consumed during the term of the Project. October 6, 2026 E - 67 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 2 of 11 “Communications Materials” means any public communications regarding his Agreement, including news releases, information, print/audio-visual/electronic materials, websites, and exhibits. “Eligible Cost(s)” means those Project expenses set out in Schedule B that are necessary and properly incurred by the Grantee to carry out and complete the Project. “Final Project Report” means a detailed written report, in a format specified by the Commission and in the Commission’s view, of sufficient detail to assess the Project and the value of the Project in relation to the Commission’s relevant program objectives and amount of the Grant. “Financial Statement” means a written statement of account, setting out: 1. the amount of the Grant that has been received, how much of the Grant has been spent, and any portion of the Grant that is remaining; and 2. the details of what the Grant was spent on, including all Eligible Costs, using, where applicable, specified forms and providing supporting documentation. “Grant” means the total amount of money the Commission will provide to the Grantee under this Agreement for carrying out and completing the Project. “Project” means the activities described in detail in Schedule A for which the Grant was approved. 2. TERM AND DUTIES 2.01 The Term of this Agreement will, notwithstanding the actual date of execution and delivery of this Agreement, start on the 1st day of MARCH 2027 and will end on the 31st day of DECEMBER 2027 (“Term”) unless sooner terminated in accordance with the provisions of this Agreement. 2.02 The Grantee will during the Term carry out and complete the Project to the satisfaction of the Commission. October 6, 2026 E - 68 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 3 of 12 3. PAYMENTS AND SCHEDULE 3.01 Subject to the terms and conditions of this Agreement and in consideration for the performance of the Project, the Commission will pay to the Grantee a sum not to exceed $300,000.00 USD. 3.02 The amount specified in section 3.01 is a maximum amount and will be disbursed by the Commission to the Grantee as follows: (a) an initial Accountable Advance of up to $150,000.00 USD upon signing this Agreement; (b) further Accountable Advances as required for the Project if the Grantee notifies the Commission, and the Commission is satisfied that the Project is being performed in accordance with this Agreement and is on track to be completed in accordance with the timelines stipulated in this Agreement. These amounts, when combined with the amount specified in subsection (a) must not cause the total of Accountable Advances to exceed 90% of the total Grant specified in section 3.01; and (c) a final payment, upon receipt of a satisfactory Final Project Report and Financial Statement submitted by the Grantee in the format and within the timelines specified in section 8. The final payment is also subject to the following: i. when combined with the amounts in subsection (a) and (b), the final payment will not exceed the Grant specified in section 3.01; ii. the Eligible Costs stipulated in Schedule B have not been exceeded; and iii. the Grantee has complied with all terms and conditions of this Agreement. 3.03 The Grantee agrees to receive and be held accountable for use and disbursement of the funds as received from the Commission in accordance with this Agreement, including this section 3. 4. ELIGIBLE COSTS 4.01 The Grantee may use the Grant to pay the Eligible Costs set out in Schedule B. October 6, 2026 E - 69 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 4 of 12 4.02 The Grant Program Manager of the Commission is the only person duly authorized to approve amendments to Schedule B on behalf of the Commission. Any such amendments shall be in writing. October 6, 2026 E - 70 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 5 of 12 5. CONDITIONS OF GRANT 5.01 If this Agreement is terminated before the end of the Term, then the Grantee will, upon the Commission issuing a written demand, repay the Commission the entirety of the Grant or any portion thereof. The amount that the Grantee will repay will depend upon the stage at which the Project was completed, the amount of the Grant that was applied to the Project, and the amounts of the Grant that are accounted for in accordance with this Agreement. 5.02 Regardless of the other terms in this Agreement, the Commission will not pay the Grantee more than the amount specified in section 3.01. 6. REPAYMENT TERMS 6.01 If, for any reason, the Grantee is required to pay or refund money to the Commission, the Grantee will pay the required amount to the Commission within 60 days of receipt of the written demand. 7. GOODS AND SERVICES TAX (GST) 7.01 The maximum amount of the Grant payable by the Commission to the Grantee, as set out in section 3.01, includes any GST which may be payable by the Grantee. 7.02 The Grantee will make every effort to ensure that it does not pay GST unless required under applicable legislation, and it will not request reimbursement from the Commission for any amount paid by the Grantee for which there is a rebate available to the Grantee. 8. REPORTS AND STATEMENTS 8.01 The Grantee will prepare and submit to the Commission in a readable format and at the frequency and dates specified below: (a) Final Project Report – to be completed within or by 45 days of the end date of this Agreement; and (b) Financial Statement - to be completed within or by 45 days of the end date of this Agreement; October 6, 2026 E - 71 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 6 of 12 8.02 Without limiting the above reporting requirements, the Grantee will: (a) provide any reports (in a readable format) requested by the Commission; and (b) in writing, immediately advise the Commission as soon as it becomes aware that there will be a delay in completing the Project or complying with any other term and condition in this Agreement and the reason for such delay(s). 9. PURCHASE OF ASSETS 9.01 Where identified as an Eligible Cost, a Grantee may use the Grant to purchase Assets that are required to carry out and complete the Project. 9.02 The Commission may, in its sole discretion, refuse to approve a request by a Grantee to purchase Assets, or approve the request on certain terms and conditions. 9.03 Upon purchase of Assets, unless otherwise determined by the Commission, the Grantee assumes ownership and ongoing costs and liabilities associated with the ownership of the Assets. 10. TERMINATION 10.01 The Commission may, by giving 30 days’ written notice to the Grantee, terminate this Agreement. 11. REPRESENTATIVE 11.01 For the purposes of this Agreement, the Commission hereby designates Sascha Bendt, Grant Program Manager, as its representative. 12. NOTICE 12.01 Any notice (including a written demand) provided for under this Agreement may be delivered or sent by regular or registered mail, courier, or email. Notice will be considered as received upon delivery by courier, or one (1) business day after being sent via email, or five (5) business days after mailing. Any notice to the Commission shall be sent to: Pacific Salmon Commission Attention: Grant Programs October 6, 2026 E - 72 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 7 of 12 600-1155 Robson Street Vancouver, BC, V6E 1B5 Email: funds@psc.org Any notice to the Grantee shall be sent to: City of Port Angeles Attention: Anina Jones 321 E 5th St Port Angeles, WA. 98362 12.02 If a party changes its address, it will deliver written notice of the change to the other party immediately. Once notice is delivered, the new address specified will, be considered the address of the party giving the notice. 13. SUBCONTRACTORS 13.01 The Grantee acknowledges, and the Commission agrees, that responsibility for implementation of the Project may be subcontracted by the Grantee to a subcontractor subject to the Grantee obtaining the prior written consent of the Commission and that the Commission, in its sole discretion, may approve the request on certain terms and conditions. The Grantee will ensure the subcontractor is responsible for the Project, the subcontractor complies with this Agreement, and the Grantee will monitor, evaluate, and report on Project delivery in a systematic manner and collect and compile Project records. The subcontracting of any responsibilities relating to the Project does not relieve the Grantee of its obligation to comply with this Agreement, including completing the Project in a timely and competent manner. 14. COMMUNICATIONS, PUBLIC ANNOUNCEMENTS AND ACKNOWLEDGEMENT 14.01 The Commission may make public announcements relating to this Agreement, which may include the Grantees’ name, amount of the Grant, and other details concerning the Project. 14.02 The Commission may create and use Communications Materials pertaining to the Project for use in the Commission’s newsletters, website, annual reports, social media, and other forms of communications. 14.03 The Grantee grants permission to the Commission to reproduce/publish Project photos provided in the Final Project Report. October 6, 2026 E - 73 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 8 of 12 14.04 The Grantee shall ensure the Commission receives acknowledgement for its role and contribution on all Communications Materials related to the Project. At a minimum the recognition statement should state: "______ gratefully acknowledges the financial support of the Pacific Salmon Commission’s Southern Fund" and should be accompanied by the official logo of the Commission. 15. WARRANTIES AND REPRESENTATIONS 15.01 The Grantee warrants and represents that: (a) it does not know of any fact(s) that may or does materially adversely affect its assets, properties, business, operations, or condition (financial or otherwise); (b) it does not know of any fact(s) that may or does materially adversely affect its ability to satisfy or fulfil its obligations under this Agreement; (c) it is not in breach of, or in default under, any law, statute, or regulation of the United States of America or of the State of Washington that applies to or is binding upon it; (d) it is able to enter into this Agreement and to carry out the transactions contemplated by this Agreement and all necessary proceedings have been taken and done to authorize the execution and delivery of this Agreement by the Grantee and this Agreement has been legally and properly executed by the Grantee and is legally binding upon and enforceable against the Grantee in accordance with its terms. 15.02 The Grantee represents and warrants that it has no direct or indirect beneficial interest whether financial or otherwise in the business or affairs of any third party that would give rise to a conflict of interest. 16. INSURANCE AND INDEMNIFICATION 16.01 The Grantee shall indemnify and save harmless the Commission, its agents, and employees from all losses, claims, damages, costs, charges, actions, and other proceedings which may arise in connection with the Project, including the use of any Assets. The Grantee agrees that this indemnity shall survive the period of time required to fulfil this Agreement. 16.02 The Grantee's liability to indemnify or reimburse the Commission under this Agreement shall not affect or prejudice the Commission from exercising any other rights under law. 16.03 Without limiting its obligations or liabilities under this Agreement, and at its own expense, the Grantee shall obtain and maintain insurance as required to cover the risks it has assumed or may encounter as a result of entering into this Agreement or completing the Project during the Term. October 6, 2026 E - 74 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 9 of 12 17. INTELLECTUAL PROPERTY 17.01 Title to any intellectual property created solely by the Grantee as part of or in respect of the Project shall vest with the Grantee. 17.02 The Commission will have a non-exclusive perpetual royalty free world-wide license to use, reproduce, modify, copy, for any purpose in its sole discretion, any or all of the material produced, received, or acquired by the Grantee as a result of this Agreement. 17.03 The Grantee warrants that the Project does not violate any copyright or other intellectual property rights of any other person. 18. MISCELLANEOUS 18.01 No amendment of this Agreement shall be effective unless made in writing and signed by the parties. 18.02 This Agreement constitutes the entire Agreement between the parties with respect to the subject matter of this Agreement and supersedes all previous negotiations, communications and other Agreements relating to this Agreement except as expressly set out in this Agreement. 18.03 The Grantee will not transfer or assign this Agreement or any part thereof, or its rights, duties, or obligations under this Agreement, without the prior written consent of the Commission. 18.04 Time is of the essence of this Agreement. 18.05 If any provision of this Agreement or the application thereof to any person or circumstance is invalid or unenforceable to any extent, the remainder of this Agreement and the application of such provision to any other person or circumstance will not be affected or impaired thereby and will be valid and enforceable to the extent permitted by law. 18.06 The parties agree that the laws of the Province of British Columbia and the laws of Canada shall govern this Agreement. 18.07 The Grantee shall comply with all laws applicable to Project or any part thereof including, without limitation, all laws concerning health, safety, employment and labour standards, and environmental protection. Evidence of compliance with such laws shall be furnished by the Grantee if requested by the Commission. October 6, 2026 E - 75 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 10 of 12 19. SIGNATURES This Agreement has been executed on behalf of the Commission and the Grantee by their duly authorized signatories. PACIFIC SALMON COMMISSION CITY OF PORT ANGELES By: __________________________________ By: ____________________________________ Print Name: ____John Field_____________ Print Name: _____________________________ Title: ________Executive Secretary______ Title: ____________________________________ Date: __________________________________ Date: ____________________________________ October 6, 2026 E - 76 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 11 of 12 SCHEDULE “A” THE PROJECT The Grantee, in consultation with and with the prior approval of the Commission, will carry out and complete the Project as described below: October 6, 2026 E - 77 1 Southern Fund Detailed Proposal Form 2025 Project Title: Ennis Creek Fish Barrier Removal Proponent’s name: Jonathan Boehme; Jamie Michel, Mike McHenry Affiliation / Organization: City of Port Angeles; Lower Elwha Klallam Tribe E-mail address: jboehme@cityofpa.us Phone: (360) 460-3456 Identify the one category of eligible activity that best describes the main intent of the proposal. Refer to the Call for Proposals for context. Amount requested: $300,000 USD 1. Habitat Restoration / Preservation 2. Southern Panel Priority 3. Fraser River Panel Priority 4. Chinook Technical Committee Priority 5. Okanagan Work Group 6. Other / General Project Location: Has the Southern Fund funded this project previously? No If the project spans multiple years: this request is for year 1 of 1 Are you also seeking funding from the Northern Fund for this project? No Start date: 01/April/2025 End date (period covered by this application): 31/December/2025 Expected end date (overall project – if different): 31/December/2025 October 6, 2026 E - 78 Southern Fund Detailed Proposal Form 2025 2 Part 1: RELEVANCE AND SIGNIFICANCE 1. Overview: Ennis Creek is located on the Olympic Peninsula of Washington State with its headwaters protected within the Olympic National Park. Ennis Creek flows 8.65 miles through National Park, Washington Department of Natural Resources, and intact forested ravines to enter the Strait of Juan de Fuca about a mile east of downtown City of Port Angeles. Ennis Creek is less than 0.5 miles upstream from the former Y’innis village and was inhabited by the Lower Elwha Klallam Tribe for thousands of years prior to colonization. The region comprises Usual and Accustomed Treaty Area on ancestral land, with waters of Ennis Creek historically stocked with various populations of anadromous fish. Existing double barrel concrete culverts were identified as a fish barrier across Ennis Creek at River Mile 0.5 (Worksite 1: 931825). This proposal will provide funding to remove the fish passage barrier associated with the undersized twin culverts on East Ennis Road, Port Angeles and re-establish the crossing with a bridge. Removal of the barrier will reconnect approximately 5.4 river miles and restore access of an estimated 80 acres of historically available, high-quality habitats resulting in beneficial outcomes for Endangered Species Act (ESA)-listed and various resident fish of all freshwater life stages in the watershed. The project is expected to support recovery of salmonid populations to historic levels of abundance. 2. Stock: The stocks identified are ESA-listed and designated evolutionarily significant units (ESU) Puget Sound steelhead, Puget Sound Chinook and bull trout in addition to Coho, Chum, Cutthroat, Pacific lamprey, and resident trout populations. 3. Conservation: Although Ennis Creek populations are a small component of the overall ESU, all populations within Ennis Creek are at critically low levels with Chinook likely extirpated revealing a high level of concern. Smolt trapping conducted by the Lower Elwha Klallam Tribe indicated low productivity of Coho, steelhead, and cutthroat. 4. Bilateral Fishery Relevance: As one of the last fish barriers upstream, removal will restore fish passage and provide an estimated 80 acres of high-quality critical habitat that is currently inaccessible in conjunction with two upstream barrier removal projects. The projected impact on stocks identified are expected to remedy barriers to migration by reconnecting approximately 5.4 miles of river habitat into the Strait of Juan de Fuca (Port Angeles Harbor) for ESA-listed and ESU designated salmonids. Degradation of streams both large and small has led to a decline in abundance and diversity of Puget Sound anadromous species. Lower Elwha Klallam Tribe will conduct annual surveys to document fish use upstream and downstream of the new bridge. 5. Fishery Benefits: The restoration of salmon relies on small rivers and its significant contribution in diversifying an assortment of species. Historically, smaller systems were important in “portfolio effect” to maintain a diverse marine ecosystem. The diversity supported and increased fishing opportunities in time and space, October 6, 2026 E - 79 Southern Fund Detailed Proposal Form 2025 3 and a full recovery is needed to achieve diversity within the larger systems. Coho and Chinook are rated high in fishery relevance according to the Strategic Plan of the Southern Fund Committee. 6. Context: Ennis Creek Fish Barrier Removal project is identified in the Puget Sound Chinook Recovery Plan, Action Agenda for Puget Sound, Coastal and Puget Sound Bill Trout Recovery Plan, ESA Recovery Plan for Puget Sound steelhead, and included in various watershed planning documents as follows: North Olympic Peninsula Lead Entity for Salmon Workplan, Water Resources Inventory Area 18 Limiting Factors Analysis, and the Ennis Watershed Plan. Ennis Creek Fish Barrier removal is also included in the 2025-2030 City of Port Angeles Capital Facilities and Transportation Improvement Plan. Further, the project has been ranked, vetted, and prioritized by the North Olympic Peninsula Lead Entity for Salmon, a community coalition working to coordinate and implement local salmon recovery efforts. The project is in partnership and supported by the Friends of Ennis Creek who actively assist with project updates and community outreach. The project will be led by the City of Port Angeles and Lower Elwha Klallam Tribe with responsibilities detailed in an inter-local agency agreement. Partnerships include the North Olympic Lead Entity for Salmon and Friends of Ennis Creek. U.S. Fish and Wildlife Services (USFWS) and Washington State Recreation and Conservation Office’s (RCO) Brian Abbott Fish Barrier Removal Board (BAFBRB) grant program are funding partners in the design engineering with construction activities funded by National Oceanic and Atmospheric Administration (NOAA). Two additional upstream fish barrier removal projects are planned and underway on Ennis Creek as shown in Figure 1. The proposed culvert removal will be necessary in ensuring maximum benefit for fish passage along Ennis Creek upstream and downstream for several miles. In alignment with the Pacific Salmon Commission Priority Area 1: Habitat Preservation and Restoration, funding support from the Southern Fund has potential to contribute to the complete fish passage of Ennis Creek and ultimately carry the downstream project forward into substantial completion expected Fall 2025. Part 2: TECHNICAL IMPLEMENTATION DETAILS 7. Approach: The project which is being designed by Environmental Science Associates under a professional services agreement with the Lower Elwha Kallam Tribe does not deviate from a traditional approach to correcting fish barriers at water crossing. The design which is currently approaching 30% proposes a modular precast bridge to replace the existing double barrel culverts. Stream waters will be diverted and restored after culvert removal, grading, bridge installation, road work, and habitat enhancements are complete. Because the crossing occurs just before the end of a road where the City of Port Angeles Wastewater Treatment Plant and four residences are located, construction will also involve creating adequate access through City property to the north for workers, residents, and emergency services during the short duration of time which the crossing is impassable. This project will leverage two additional worksites of fish passage barrier removal projects along Ennis Creek. River mile 0.14 (Worksite 2: 992658) will include the complete removal of an abandoned sewer main. The project will also leverage a culvert removal currently underway by Washington State Department of Transportation located on U.S. HWY 101 which will open 10.5 sq mi of drainage area and 8.6 miles of Ennis Creek to anadromous salmon. This combined result of these projects will enable access October 6, 2026 E - 80 Southern Fund Detailed Proposal Form 2025 4 to high quality, upstream habitat with its headwaters originating in the Olympic National Park at more than 6,000 feet elevation with approximately 3 miles of upper reach and several Ennis tributary streams protected. Figure 1. Ennis Creek Worksites: Worksite 1. 9831825; Existing Double Barrel Culverts 8. Schedule: The project is currently approaching a 30% design and is anticipated to be complete with plans, specifications, estimates, and a permit package by the end of March. The project will go to bid and will be awarded approximately a month later, after advertisement, questions, review, and approval. The contractor will be responsible for procuring materials and detailing the construction timeline, which will occur in the approved work window for fish protection – July 15th to September 30th shown in Figure 2. After construction, project closeout will occur. October 6, 2026 E - 81 Southern Fund Detailed Proposal Form 2025 5 Figure 2. Ennis Creek Fish Barrier Removal Project Schedule Ennis Creek Fish Barrier Removal (Worksite #1) 2025 Task Ja n Fe b Ma r Ap r Ma y Ju n Ju l Au g Se p Oc t No v De c Design -> Construction Bid Process Permitting -> Pre-Restoration Monitoring Materials Procurement Construction Project Closeout and Reporting Implementation Monitoring (Ends Oct '26) -> 9. Assumptions and Risks: The project assumes the engineer’s estimate and funding availability will cover the construction costs, the bridge materials will be procured prior to time of construction, and that any easements impacting private driveway owners will be granted. The primary risk of funding has been addressed by using a conservative contingency in the estimate, proactively sourcing additional funding to supplement the $1.4 million NOAA grant awarded to the Lower Elwha Klallam Tribe for construction, and consideration of additives for expanded stream and habitat work. The risk of lead time for the desired bridge system is anticipated to be well within the window for procurement. The risk of allowance for minor modifications to existing driveways is being addressed through early communication with property owners. Part 3: CAPACITY TO DELIVER 10. Key Personnel: For construction of the Ennis Creek Fish Barrier Removal, the City of Port Angeles will be managing construction and the requirements of this grant, while the Lower Elwha Klallam Tribe will be providing guidance and managing the requirements of the NOAA Tribal Priority Fish Passage Project grant. The City and Lower Elwha Klallam Tribe both regularly receive, manage, and fulfill the obligations of grant awards, up to the federal level. City Stormwater Engineer, Ryan Jeffries will be leading the project with support by Civil/Utility Engineer, Matthew Moore and oversight by Capital Projects Engineer, Vince McIntyre and City Engineer, Jonathan Boehme. Jonathan Boehme, PE is the City Engineer for the City of Port Angeles and has been with the City of 11 years. As City Engineer, Jonathan is responsible for managing the delivery of the City's $140 million six- year capital project plan. He also oversees the City's utilities and infrastructure. Before joining the City, he worked for the Washington State Department of Transportation for seven years designing and inspecting transportation highway projects. October 6, 2026 E - 82 Southern Fund Detailed Proposal Form 2025 6 Vince McIntyre, PE is a Civil/Utility Engineer for the City of Port Angeles and has been with the City for 10 years. Vince serves as the Capital Projects Engineer and formerly served as the Stormwater Engineer from 2018 to 2023. Vince has 10 years of experience in stormwater design, including two years of laboratory research. Vince has supported numerous grant funded projects. Ryan Jeffries, PE is a Civil/Utility Engineer for the City of Port Angeles and has been with the City for two years where he serves as the Stormwater Engineer. Before joining the City, he worked for a consulting firm in Alaska as a Senior Engineer and as Capital Projects Project Manager for the Lower Kuskokwim School District; Ryan has worked as a Professional Engineer in the Puget Sound Region from 1995 to 2018. Matthew Moore, EIT is a Civil & Utility Engineer I for the City of Port Angeles and has been with the City for two years. Matthew serves as a support for the City’s stormwater program and capital facilities projects. Matthew has two years of project management prior to joining the City. Support from the Lower Elwha Klallam Tribe includes Habitat Managers, Mike McHenry and Jamie Michel, who have 49 combined years experience in fisheries habitat restoration management. Lower Elwha Klallam Tribe was involved with the nation’s largest fish passage project completed to date which included removal of the Elwha River dams. Lower Elwha Klallam Tribe Habitat Restoration Management have been monitoring the repopulation of the Elwha watershed for more than a decade with expertise and monitoring partnerships with NOAA Northwest Fisheries Science Center giving experience, sufficient capability, and techniques. 11. Consultation, coordination, and approvals: The City of Port Angeles, established in 1890, has recently been working closely with the Lower Elwha Klallam Tribe , whose people have inhabited the Olympic Peninsula for thousands of years, to correct infrastructure of the past and restore fish runs in the area. Restoring Ennis Creek is a priority for the City of Port Angeles, Lower Elwha Klallam Tribe, and other community partners such as the North Olympic Peninsula Lead Entity for Salmon and Friends of Ennis Creek. Additionally, we have had support from the Rayonier Properties LLC who is granting the property access necessary for the removal of fish barriers along Ennis Creek. The City of Port Angeles will be managing construction of the fish barrier removal where the majority of funding will come through a pass-through grant awarded by NOAA to the Lower Elwha Klallam Tribe. NOAA will be the lead for federal permits S106, ESA, and NEPA. All other permitting will be applied for by the City of Port Angeles as the lead with the Lower Elwha Klallam Tribe as a partner. These responsibilities will be formalized into a new inter-local agreement for construction. The Lower Elwha Klallam Tribe has been working closely with USFWS and WDFW during the design process. The design itself follows the WDFW’s Water Crossing Design Guidelines (2013) and is anticipated to exceed the minimum requirements for the fish passage. The Lower Elwha Klallam Tribe will be performing monitoring before and after project completion to measure success. 12. Partnerships: The project is led by the City of Port Angeles and Lower Elwha Klallam Tribe. The project site, infrastructure and right of way are all City owned. Awarded NOAA construction funds to the Lower Elwha Klallam Tribe will be managed and implemented by the City of Port Angeles. The design and permitting phase of the project are funded by USFWS. In partnership with the Friends of Ennis Creek, October 6, 2026 E - 83 Southern Fund Detailed Proposal Form 2025 7 who actively assist with project updates and community outreach. This project has been ranked, vetted, and prioritized by the North Olympic Peninsula Lead Entity for Salmon, a community coalition working to coordinate and implement local salmon recovery efforts. Permits will be sought from the City of Port Angeles and Washington Department of Fish and Wildlife (WDFW) and Federal agencies. Tribal staff will interact with Tribal community members through conversation and engagement at the annual Natural Resources dinner with Tribal members. Fish barrier removal projects align with local community priorities in conservation efforts and create opportunity in engaging with multiple Tribes in the region undergoing similar activities. Rayonier, the former pulp mill, has been coordinating with the City of Port Angeles and the Lower Elwha Klallam Tribe in the clean-up and restoration of 80 acres where the project site is located. The environmental benefits and initiatives can extend beyond local and into regional-wide interest from Clallam County due to its restoration, supporting healthier ecosystems and overall health benefits of the community. Healthy fish populations can foster economic benefits to support the tourism and recreation industry that are heavily relied on in the region. The Washington State Fish Barrier Removal Project was an established statewide effort to coordinate the removal of barriers across the state with local efforts contributing to the broader salmon recovery plans and national conservation goals. Part 4: BENEFITS 13. Measures of success: The project has two primary measures of success, the construction being completed as designed and the long-term restoration of impacted habitat. Both measures make assumptions based on models and best practices informed by the current understanding for restoring fish passages. The project’s concrete achievements such as increasing the bankfull width, reducing the velocity at the crossing, increasing spawning and rearing habitat areas, and restoring miles of access of creek will be almost immediately clear. The longer-term recovery associated with the site will be understood several years after construction with the conclusion of the implementation monitoring program administered by the Lower Elwha Klallam Tribe and supported by NOAA. Additionally, the barrier at Ennis Creek was identified in the Puget Sound Chinook Recovery Plan, Action Agenda for Puget Sound, Coastal and Puget Sound Bull Trout Recovery Plan, and ESA Recovery Plan for Puget Sound Steelhead. Fish recovery and return is expected with the barrier removal. An additional measure of success is the impression on the community. Ennis Creek was recognized as the best opportunity for restoration among six urban streams of Port Angeles identified by the project’s education and outreach partner, Friends of Ennis Creek. Remedying barriers, revegetating native conifer buffers, and placing wood to act as refugia and promote diversity among anadromous salmonid populations. Restoration provides increased quantity and quality of riparian and aquatic habitat providing high quality salmonid rearing and spawning habitat benefiting more than 130 species including the orca, bear, and coastal communities. Anadromous fish also provide upstream benefits when they reach the end of life by contributing to the flora and fauna as a result from nutrients brought from the ocean essential for healthy vegetation and trees along reaches of the river. 14. Monitoring and Assessment: The Lower Elwha Klallam Tribe will conduct annual surveys to document fish use upstream and downstream of the new bridge. The award from NOAA initiated an implementation monitoring plan October 6, 2026 E - 84 Southern Fund Detailed Proposal Form 2025 8 consistent with NOAA Tier 1 Guidance to detect fish passage, habitat quality and fish use by species/life stage on Ennis Creek three years following bridge installation. The NOAA construction funds will also be utilized to develop and implement a site-specific monitoring plan. 15. Beneficiaries: The City of Port Angeles and Lower Elwha Klallam Tribe are both identified as disadvantaged census tracts indicated by the CEQ Climate and Economic Justic Screening Tool. The Ennis Creek Fish Barrier Removal project’s conservation efforts will complement a future independent project seeking to fully restore a former pulp mill site to include the stream corridor, estuary and nearshore on 80 acres of the lower half mile of the river downstream. The removal of this barrier culvert along with the remediation of a superfund Model Toxics Control Act (MTCA) site located approximately 0.5 miles downstream at the location of a former Elwha Kallam Tribal village site will bring environmental justice and an improved sense of place for community members. Additionally, replacement of the undersized culverts will alleviate backwater flooding impacts for adjacent upstream residences and will reduce the likelihood of a road failure. The road containing the culverts is owned by the City of Port Angeles providing access to critical infrastructure such as the wastewater treatment plant. Improving fish passage will provide the co-benefit of reliable vehicle access to the wastewater treatment plant enabling the facility to continue minimizing any septic inputs into the marine environment. Part 5: COST EFFECTIVENESS 16. Costs: The project proposes to remove two 7-foot diameter by 50-foot-long concrete culverts and replace the crossing with a pre-cast modular bridge. By removing the culverts, the appropriate bankfull width will be restored and velocity barrier removed to allow fish migration. Alternate bridge and box culvert options were considered for the crossing before landing on an option that could accommodate the desired bankfull width, road standards, available property boundaries, and project budget. The removal of the culverts is not possible without the replacement of an adequate crossing and the Southern Fund will contribute to the cost associated with the bridge itself, including the foundations and wingwalls. Other site supplies and materials listed are based on the first 30% design alternative and is not expected to be significantly different than the final cost estimate. While all items are critical to the successful restoration of the area, some of the stream and habitat work may be considered as bid additives to create flexibility with available funding. The labor costs detailed in the budget form is the current best estimate for the project based on the designer’s first alternative and the City of Port Angeles and Lower Elwha Klallam Tribe’s assumptions for project management. For the City, the cost of labor for project management and administration has been roughly estimated based on our current understanding of the project and will be refined as the final design is completed. 17. Cost sharing: The following entities and programs are the resource partners dedicated to the project. Letters of Acknowledgement and Letters of Support are provided in Appendix A. October 6, 2026 E - 85 Southern Fund Detailed Proposal Form 2025 9 USFWS National Fish Passage Program: A federal partner supporting aquatic ecosystem restoration projects and restores free-flowing waters, allowing for enhanced fish migration and protecting communities from flooding. NOAA Restoring Tribal Barrier Fish Passage Program: A federal program for fish passage and tribal capacity building under the Bipartisan Infrastructure Law. Washington State Recreation & Conservation Office Brian Abbott Fish Barrier Removal Grant: A Washington State Legislative program governed by the Brian Abbott Fish Barrier Removal Board to identify and remove impediments to the migration of salmon and steelhead listed under the federal Endangered Species Act. Contributors Amount Status Design Phase USFWS $200,000 Confirmed RCO Brian Abbott Fish Barrier $255,000 Pending* City of Port Angeles $45,000 Confirmed Construction Phase NOAA $1,402,396 Confirmed Pacific Salmon Commission $300,000 Requested *The City of Port Angeles is currently negotiating to accept a $255,000 design only grant from the RCO Brian Abbott Fish Barrier Removal Grant for worksites 1 and 2. Where the Lower Elwha Klallam Tribe had been awarded a $200,000 design only grant by the USFWS for the design of the Ennis Creek Fish Barrier Removal (Worksite 1), we anticipate only a portion of the RCOBAFBR grant will be utilized. 18. Duration of the funding request: The funding request is only for the construction portion of the project, which we anticipate being completed in Fall of 2025 with 2 to 3 months for close-out for grant administrative and project report activities completed by the end of the year. The monitoring portion of the project will extend at least three years beyond the project completion date and is being completed by the Lower Elwha Klallam Tribe and funded by NOAA. Part 6: PROGRESS UPDATE (ONGOING PROJECTS ONLY) 19. N/A October 6, 2026 E - 86 Appendix A October 6, 2026 E - 87 October 6, 2026 E - 88 October 6, 2026 E - 89 Julia Guarino, Senior Associate Tribal Attorney, Lower Elwha Klallam Tribe October 6, 2026 E - 90 October 6, 2026 E - 91 October 6, 2026 E - 92 RESOLUTION NO. 03 -e2 3 A RESOLUTION of the City Council of the City of Port Angeles, Washington, adopting the City's Capital Facilities Plan for 2024 — 2029, which includes the City's Transportation Improvement Program for the years 2024-2029. WHEREAS, the City of Port Angeles is required to annually update its Capital Facilities Plan (CFP) and its Transportation Improvement Program (TIP); and WHEREAS, the City Council of the City of Port Angeles, being the legislative body of said City, on the 6th day of June 2023 and the 20th day of June 2023, did hold public hearings on the proposed CFP and TIP for 2024 — 2029; and WHEREAS, the proposed CFP and TIP for 2024- 2029 are consistent with the City's Comprehensive Plan; and WHEREAS, the City Council finds and declares that the CFP, including the TIP, is appropriate to address the capital and transportation planning needs of the City for 2024-2029. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles, Washington, that the City's 2024 — 2029 CFP, which includes the City's TIP for the years 2024 -2029, as published April 28, 2023 in a document filed with the City Clerk titled the Preliminary Capital Facilities Plan and Transportation Improvement Plan for the City" and as it is illustrated by the project listing attached to this Resolution, is hereby adopted. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 20th day of June 2023. G Kate Dexter, Mayor ATT ST: Kari Martinez -Bailey, C' .Ie OVED AS TO FORM: William E. Bloor, City October 6, 2026 E - 93 October 6, 2026 E - 94 united States Department of the Interior FISH AND WILDLIFE SERVICE Westem Washington Fish and Wildlife Conservation Office 500 Desmond Drive SE Lacey, Washington 98503 November 15,2024 Dear Pacific Salmon Commission Staff, The U.S Fish and Wildlife Service (USFWS) supports the City of Port Angeles's Public Works and Utilities construction funding request to correct the last remaining fish passage banier on Ennis Creek. USFWS is already providing $200,000 of funding to the Lower Elwha Klallam Tribe's forthe engineering design phase of this project through our National Fish Passage Program. The request to correct this barrier is strategically timed for construction funding since the Tribe has secured design funding via the USFWS National Fish Passage Program and NOAA's Restoring Tribal Priority Fish Passage through Barrier Removal funding. The Washington State Department of Transportation is scheduled to resolve the upstream barrier at Highway 101 during 2024. The synergy of these efforts will resolve the last unfunded barrier on Ennis Creek. Ennis Creek provides habitat for Puget Sound steelhead and is part ofthe Puget Sound steelhead ESU. It is also part of the USFWS's Federal Bull Trout Recovery Plan. Puget Sound Coho Salmon and Cutthroat Trout are also present. While Chum Salmon have likely been extirpated, the removal of fish passage barriers and other planned restoration actions in lower Ennis Creek may open the door to future recovery efforts. With this work and other restoration proposed for the near future combined, it significantly increases chances for improved salmon runs on Ennis Creek. Please strongly consider this proposal to ensure that the remaining unfunded fish passage banier on Ennis Creek is removed. Thank you for your consideration. Sincerely, BENJAMIN CROSS Digitally signed by BENJAMIN cRoss Datei 2024.1 1.1 5 1 2i42:32 -08'00' Benjamin Cross, Ph.D. Project Leader benj amin_cross @fws. gov PACIFIC R-EGION 1 IDAHO, ONEGON*, WASHINGTON, AMEzuCAN SAMOA, GUEU, HAWAII, NORTHERN MAzuANA ISLANDS -PARrIAI October 6, 2026 E - 95 Page 1 of 12 Version: 18 - 2/14/2024 3:34 PM | Generated on: 9/6/2024 12:17 AM Department of Commerce National Oceanic and Atmospheric Administration (NOAA) Fisheries Habitat Conservation Program Office (HCPO) Notice of Award (NoA) NA24NMFX463C0020-T1-01 RECIPIENT INFORMATION 1. Recipient Name LOWER ELWHA TRIBAL COMMUNITY COUNCIL 2851 LOWER ELWHA RD PORT ANGELES, WA 98363 2. Congressional District of Recipient 06 3. Employer Identification Number (EIN) 91-0838085 4. UEI TZX8FVYKGNT3 5. Recipient Point of Contact Jamie Michel 6. Authorized Official Michel, Jamie jamie.michel@elwha.org _______________________________________________ FEDERAL AGENCY CONTACT INFORMATION 7. Grant Specialist Elana Felberg Elana.Felberg@noaa.gov 8. Program Officer Julia Royster julia.royster@noaa.gov 9. Grant Officer Olga Dixon olga.dixon@noaa.gov FEDERAL AWARD INFORMATION 10. Award Number / FAIN NA24NMFX463C0020-T1-01 / NA24NMFX463C0020 / Mod 0 11. Award Type Cooperative Agreement 12. Period of Performance Start Date & End Date 09/01/2024 – 01/31/2027 13. Federal Share of Cost $1,402,396 14. Recipient Share of Cost $0 15. Total Federal and Recipient Cost $1,402,396 16. Opportunity Number NOAA-NMFS-HCPO-2023-2008074 17. Project Title Ennis Creek Barrier Correction - East Ennis Road 18. Assistance Listing Number and Name 11.463 Habitat Conservation 19. Award Action Type New Competing 20. Multiyear Award? No 21. R&D Award? No 22. Construction Award? No 23. Grants Officer – Signature and Date Olga Dixon – 09/06/2024 October 6, 2026 E - 96 Page 2 of 12 Version: 18 2/14/2024 3:34 PM | Generated on: 9/6/2024 12:17 AM Department of Commerce NOAA Fisheries Habitat Conservation Program Office (HCPO) Notice of Award NA24NMFX463C0020-T1-01 NOTICE OF NOAA AWARD COVER LETTER Congratulations, you are the recipient of NOAA award Number NA24NMFX463C0020-T1-01. This Notice of Award (NoA) approved by the NOAA Grants Officer, constitutes the official grant award and the obligation of Federal funding. The NoA serves as the official legal document issued to notify the recipient and others that an award has been made. The NoA contains all terms and conditions of the grant award. The complete NoA can be found and downloaded under eRA Commons using the following instructions: View Notice of Award | eRA This NoA was sent to the specified email address entered in the NoA email field by the recipient organization when completing the electronic Research Administration (eRA) Commons registration process. The Signing Official (SO) can update this email address through the Institutional Profile section in eRA Commons. The NoA can also be viewed from the Status Information page in eRA Commons. By accepting the award, the recipient agrees to comply with the award provisions specified on the award document. As the Signing Official (SO) you are authorized to legally bind the institution in grant-administration matters. In providing your signature approval on the grant application submission you are responsible for monitoring grant related activities and authorizing expenditures under this award. Additional Information about your award is shown below: • Assistance Listing Number: 11.463 • Project Period: 09/01/2024 – 01/31/2027 • Program Office: Fisheries Habitat Conservation Program Office (HCPO) • Program Officer: Julia Royster • Program Officer Phone: • Program Officer Email: julia.royster@noaa.gov • Total Federal Funding: $1,402,396 • Total Non-Federal Funding: $0 • Organization Name: LOWER ELWHA KLALLAM TRIBAL COUNCIL • Project Title: Ennis Creek Barrier Correction - East Ennis Road • Name of Principal Director/Project Investigator (PI/PD) as identified in the negotiated application: o Jamie Michel This email was sent from a source that is not monitored for responses. If you need assistance, contact your Program/Project Officer (for programmatic issues) or the eRA Help Desk (for technical issues). October 6, 2026 E - 97 11/18/24 , 12 :26 PM Tribal Priority Fish Passage Projects Selected for Funding I NOAA Fisheries The Cowlitz Indian Tribe ~ will address the last remaining fish passage barrier on Ostrander Creek, a tributary of the lower Cowlitz River, by completely removing a culvert and associated abandoned railroad crossing. This work will benefit multiple species of steelhead and salmon that are important subsistence and cultural resources for tribal members. It will also help reduce the risk of downstream flooding. ($1.9 million) The Lower Elwha Klallam Tribe ~ will address one of the last remaining fish passage barriers in the Ennis Creek watershed by replacing undersized culverts on a city road in Port Angeles, Washington, with a bridge. This work will benefit threatened Puget Sound steelhead, bull trout, and Chinook salmon. The new bridge will also help reduce maintenance costs and reduce the risk of road failure and flooding. ($1.4 million) The NisguallY. Indian Tribe will remove a culvert that is completely blocking fish passage on Brighton Creek, a tributary of the Nisqually River. They will replace it with a new channel-spanning culvert, opening up high quality habitat to access by threatened Puget Sound steelhead and Chinook salmon. The project design incorporates climate change projections to help prevent flooding, and a wildlife crossing to reduce the chance of animal strikes. The project will also support the tribe's Native Plant Restoration Crew's work at the project site after implementation. ($5.8 million) The Port Gamble S'Klallam Tribe ~ will work to address fish passage at the floating Hood Canal Bridge to reduce a major cause of mortality for juvenile steelhead. They will develop a plan for near- term solutions to immediately reduce the loss of steelhead at the bridge, and evaluate the possibility of replacing the bridge as a long-term solution. Addressing this significant barrier will help support sustainable tribal fisheries and protect tribal trust resources. ($2.2 million) The Skagit River SY.stem CooP-erative ~. which provides natural resource management services for the Swinomish Indian Tribal Community and the Sauk-Suiattle Indian Tribe, will remove or replace seven culverts that block fish passage in the Skagit and Samish watersheds. They will also assess the feasibility of one additional fish passage project. This project will support tribal capacity to develop and engage in fish passage projects, and provide a hands-on opportunity for tribal members and youth to participate in habitat restoration. ($3.3 million) The Sguaxin Island Tribe ~ will work to remove the 5th Avenue Dam, a barrier built across the mouth of the Deschutes River to create Capitol Lake. Removal of the dam and restoration of the estuary will create a significant amount of habitat of key importance to the recovery of threatened Puget Sound Chinook. The project will also support tribal capacity to expand their barrier removal efforts and engagement in salmon recovery planning in south Puget Sound. ($6.4 million) The TulaliP-Tribes will work with partners to remove multiple fish passage barriers at priority streams in the Stillaguamish and Snohomish Basins, part of the South Whidbey Basin in Puget Sound. This effort will open significant habitat to access by threatened Puget Sound Chinook and steelhead, as well as Puget Sound coho. It will also benefit Southern Resident killer whales, a NOAA SP-ecies in the SP-otlight , by supporting their prey. Climate change considerations will be incorporated into the barrier replacements, to help prevent flooding and increase community resilience. ($9.2 million) https://www.fisheries .noaa .gov/national/habitat-conservation/tribal-priority-fish-passage-projects-selected-funding 5/7 October 6, 2026 E - 98 North Olympic Peninsula Lead Entity for Salmon Thursday, Sept. 5, 2024 Re: Federal Highway Administration AOP Fish Passage Grant Request To Whom It May Concern: The North Olympic Peninsula Lead Entity for Salmon is a consortium which works to advance salmon restoration and protection on the North Olympic Peninsula. Participating governments include the Jamestown S’Klallam, Lower Elwha Klallam and Makah Tribes, the Cities of Port Angeles and Sequim, and Clallam County, along with various other non-profit organizations and citizens. This is a letter of support for construction funding to help alleviate a significant fish passage barrier along Ennis Creek in the City of Port Angeles. The Lower Elwha Klallam Tribe and the City of Port Angeles are working together to ensure that this long overdue fish passage barrier is corrected. This barrier is located near a Highway 101 Fish Passage Barrier Correction being done as part of a Washington State Culvert Injunction Court Case. Both the City of Port Angeles, the Lower Elwha Klallam Tribe and our Lead Entity for Salmon have long been interested in seeing these fish barriers corrected but funding was not forthcoming. This project is specifically called out in our Lead Entity’s 2024 Four Year Work Plan and has also been part of previous work plans. In addition, Ennis Creek Steelhead are listed as threatened under the Endangered Species Act and are part of the Puget Sound Steelhead Recovery Plan. Bull Trout found in Ennis Creek are also listed under ESA and are part of the Federal Puget Sound Bull Trout Recovery Plan. Ennis Creek is one of five independent, snow-fed drainages in Port Angeles. It also provides habitat for Puget Sound Coho and Cutthroat. With the Washington State Department of Transportation correcting an upstream culvert at Highway 101 and Ennis Creek shortly, it makes perfect sense to fund the correction of this last unfunded barrier on Ennis Creek. Thank you for the chance to weigh in on this opportunity to correct the fish passage barrier on Ennis Creek and hanks also for your continued efforts to advance this important work. Sincerely, Cheryl Baumann Cheryl Baumann, Coordinator North Olympic Lead Entity for Salmon Clallam County Courthouse 223 E. Fourth Street, # 5 Port Angeles, WA 98362 360/417-2326 October 6, 2026 E - 99 Friends of Ennis Creek Acknowledgement via Email October 6, 2026 E - 100 Ennis Creek Fish Barrier Removal SF-2025-H-21 Page 12 of 12 SCHEDULE “B” ELIGIBLE COSTS The Grantee may apply the Grant to the following items: October 6, 2026 E - 101 Page 1 of 2 Name of Project: PSC ELIGIBLE COSTS TOTAL OTHER S. FUND PROJECT FUNDING GRANT Labour BUDGET AMOUNT Wages & Salaries Position # of crew # of work days hrs per day rate per hour Total (PSC + In-kind + cash) In-Kind & Cash PSC Amount City of Port Angeles - - 1 30 0.8 54 1,300 1,300 1 100 1.6 52 8,320 8,320 1 250 3.2 46 36,800 36,800 1 110 4 39 17,160 17,160 1 100 8 39 31,200 31,200 1 130 0.8 46 4,790 4,790 1 20 0.4 53 430 430 Lower Elwha Klallam Tribe TBD TBD TBD TBD 100,000 100,000 - Person Days (# of crew x work days)TBD sub total 200,000 200,000 - Labour - Employer Costs ( rate = percent of Wages & Salaries subtotal ) rate sub total - # of work rate per Subcontractors & Consultants # of crew days hrs per day hour Construction Consultant, TBD TBD TBD TBD TBD 50,000 50,000 - - - - Insurance if applicable rate 0%- sub total 50,000 50,000 - # of work Volunteer Labour # of crew days hrs per day - - rate 0%- sub total - - - 250,000 250,000 - Provide details in the space below Site / Project Costs (use an additional page if needed ) - - - 216,000 216,000 84,000 84,000 28,200 28,200 315,207 315,207 459,100 159,100 300,000 76,000 76,000 Vince McIntyre, Capital Projects Engineer Ryan Jeffries, Civil/Utility Engineer III Matthew Moore, Civil/Utility Engineer I Casey McFarlen, Capital Project Manager Weston Jorgenson, Capital Projects Inspector II Lucy Hanley, Contract Specialist II Eric Walrath, Engineering Project Supervisor Import, place, and compact aggregate base; HMA surfacing; import fill for road and embankment; gravel shoulder Travel (do not include to & from work) Small Tools & Equipment Site Supplies & Materials Insurance if applicable Construction Temporary Access and Traffic Control Demolition Stream & Habitat Bridge Roadway Mob, mgmt, staging, ESC, diversion, staking & survey Gravel access, detour signage and cones, modification of (2) gates on ODT Removal and disposal of existing culverts and road Channel excavation, streambed material, wood structures, seeding and mulching, planting Bridge, foundations, and wingwalls; import fill; scour protection Southern Fund Project Budget Form 2025 Ennis Creek Fish Barrier Removal - Construction Phase See details below Un-skilled Skilled Total Labour Costs October 6, 2026 E - 102 253,889 253,889 Equipment Rental - Work & Safety Gear - Repairs & Maintenace - Permits 20,000 20,000 Technical Monitoring - Other site costs - 1,452,396 1,152,396 300,000 ELIGIBLE COSTS BUDGET OTHER CONTRIBUTION FUNDING FUNDING Training (e.g Swiftwater, bear aware, electrofishing, etc). Total (PSC + In-kind + cash) In-Kind & Cash PSC Amount # of crew # of days - - - - - - - - Administrative Costs Office space; including utilities, etc.- Office supplies - Telephone & Long Distance - Photocopies & printing - Insurance - Indirect/overhead costs - (If the PSC contribution to Indirect costs exceeds 20% of the total PSC grant - you will be required to submit back-up documentation justifying the expense).- Other overhead costs (give details)- - - - Provide details in the space below Capital Costs / Assets (use an additional page if needed ) Asset - Asset - Asset - Asset - - - - - 1,702,396 1,402,396 300,000 Budget Summary (PSC + in-kind + cash) Total Labour Costs 250,000 Total Site / Project Costs 1,452,396 Total Training Costs - Total Overhead Costs - Total Capital Costs - Project Total 1,702,396 Contingency and Tax Contingency (20%) + Sales Tax (8.9%) S106/ESA/NEPA applied for by NOAA. USACOE/HPA/SEPA/etc Applied for by City. Performed by Lower Elwha Klalla Tribe, covered under labor Total Capital Costs Project Total Costs Total Site / Project Costs Total Administrative Costs Total Training Costs Assets are things of value that have an initial cost of $10,000 or more and which can be readily misappropriated for personal use or gain or which are not, or will not be, fully consumed during the term of the project. Name of course October 6, 2026 E - 103 Date: October 6, 2026 To: City Council From: Brian S. Smith, Police Chief Subject: Stonegarden FY 2025 Grant Agreement with Clallam County Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. The Stonegarden overtime and equipment grant program directly aligns with Strategic Focus Area #4 – Infrastructure Maintenance through the protection of City assets that include Parks and City property, as well as Strategic Focus Area #2 – Citywide Resource Optimization to grow Staff capacity by providing additional Police Department resources and ability to achieve the overall mission of the Police Department and the City of Port Angeles. Background / Analysis: This funding is being provided to enhance law enforcement preparedness and operational readiness along borders of the United States. The Clallam County Sheriff’s Office (CCSO) is the award sub-recipient. The Stonegarden grant program has provided the Police Department substantial overtime and equipment funding since its inception in Clallam County in 2009. The overtime funding will allow the Police Department to assist the Olympic Peninsula Narcotics Enforcement Team (OPNET) with planned and targeted operations directed at the distribution of illicit drugs in Clallam County. The funding for Summary: The Port Angeles Police Department has received a grant award through the Stonegarden grant program since 2009. The grant originates with the Federal Emergency Management Agency (FEMA) and is administered through the Washington State Military Department. The Clallam County Sheriff’s Office is the sub-recipient and provides grant funding to the Port Angeles Police Department and to the City of Port Angeles through a letter of understanding. The FY 2025 Stonegarden Grant Program awards the Port Angeles Police Department a total of $53,750. Of that amount, $9,750 has been awarded for overtime and associated fringe benefits; $44,000 has been awarded for approved equipment. The grant performance period commenced on September 1, 2026, and will end on July 31, 2028. Strategic Plan: Aligns with Strategic Focus Area #2 – Citywide Resource Optimization and #4 – Infrastructure Maintenance. Funding: The $53,750 in funding provided will be added to the Police Department 2026 budget via a budget amendment. There is no match requirement, Recommendation: Authorize the City Manager and Police Chief to accept the grant funds and sign the letter of understanding between the City and the Clallam County Sheriff’s Office. October 6, 2026 E - 104 equipment will allow the Police Department to complete the process of outfitting each Crisis Response Team (CRT) member with modern and usable night vision equipment. Funding: The funding provided is for overtime/fringe benefits and for equipment. It will be added to the Police Department 2026 budget. There is no match requirement. Attachments: The Washington State Military Department and Clallam County Sheriff’s Office contract (#E26-323). Letter of Understanding Between the Port Angeles Police Department and the Clallam County Sheriff’s Office. October 6, 2026 E - 105 October 6, 2026 E - 106 October 6, 2026 E - 107 October 6, 2026 E - 108 October 6, 2026 E - 109 October 6, 2026 E - 110 October 6, 2026 E - 111 October 6, 2026 E - 112 October 6, 2026 E - 113 October 6, 2026 E - 114 October 6, 2026 E - 115 October 6, 2026 E - 116 October 6, 2026 E - 117 October 6, 2026 E - 118 October 6, 2026 E - 119 October 6, 2026 E - 120 October 6, 2026 E - 121 October 6, 2026 E - 122 October 6, 2026 E - 123 October 6, 2026 E - 124 October 6, 2026 E - 125 October 6, 2026 E - 126 October 6, 2026 E - 127 October 6, 2026 E - 128 October 6, 2026 E - 129 October 6, 2026 E - 130 October 6, 2026 E - 131 October 6, 2026 E - 132 October 6, 2026 E - 133 October 6, 2026 E - 134 October 6, 2026 E - 135 October 6, 2026 E - 136 October 6, 2026 E - 137 October 6, 2026 E - 138 October 6, 2026 E - 139 October 6, 2026 E - 140 October 6, 2026 E - 141 October 6, 2026 E - 142 October 6, 2026 E - 143 October 6, 2026 E - 144 October 6, 2026 E - 145 October 6, 2026 E - 146 October 6, 2026 E - 147 October 6, 2026 E - 148 October 6, 2026 E - 149 October 6, 2026 E - 150 October 6, 2026 E - 151 October 6, 2026 E - 152 October 6, 2026 E - 153 October 6, 2026 E - 154 October 6, 2026 E - 155 October 6, 2026 E - 156 October 6, 2026 E - 157 October 6, 2026 E - 158 October 6, 2026 E - 159 October 6, 2026 E - 160 October 6, 2026 E - 161 October 6, 2026 E - 162 October 6, 2026 E - 163 October 6, 2026 E - 164 October 6, 2026 E - 165 LETTER OF UNDERSTANDING BETWEEN THE PORT ANGELES POLICE DEPARTMENT AND CLALLAM COUNTY SHERIFF’S OFFICE FFY25 STONEGARDEN GRANT PROGRAM Clallam County Sheriff’s Office has received an award from the U.S. Department of Homeland Security (DHS), Federal Emergency Management Agency (FEMA) through a contract with Washington State Military Department (#E26-323). The funds are to enhance the capability of state and local units of government to prevent, deter, respond to, and recover from catastrophic and/or terrorist events through the FFY25 Operation Stonegarden Program. The funding is being provided to enhance law enforcement preparedness and operational readiness along borders of the United States. As Clallam County Sheriff’s Office (CCSO) is the award sub-recipient, it is their responsibility to report activity required by the award on such reporting forms as required for reimbursement. This Letter of Understanding (LOU) is written to describe the funding award that shall be passed on to your agency upon receipt of approved reimbursement requests and completed reporting forms. The parties understand the funding amounts allocated in this LOU may only be altered upon approval from the State and the Border Patrol, which would then need to be approved by FEMA. Port Angeles Police Department (PAPD) will receive a maximum award of $53,750.00 for the following category. Overtime: PAPD shall receive a maximum award amount of $9,750.00 for overtime approved under the FFY25 Stonegarden Grant Program. PAPD will be reimbursed for direct costs only of overtime and fringe benefits based on PAPD established overtime guidelines and policies, not to exceed $9,750.00. No reimbursements will be made for expenditures other than approved overtime. Equipment: PAPD will receive a maximum award of $44,000.00 for equipment spent on approved equipment items. The cost of this equipment will be calculated using the GSA approved rate. No reimbursements will be made for expenditures other than approved overtime or equipment. PAPD shall abide by all terms and conditions passed on to Clallam County Sheriff’s Office as per Washington State Military Department Contract (#E26-323) attached hereto. PAPD agrees to complete the attached Audit Certification Form and Debarment Certification Form and return them both to Clallam County Sheriff’s Office. PAPD agrees to complete all reporting required by Washington State Military Department and Clallam County Sheriff’s Office. All Daily Activity Reports (DAR) for overtime must be entered into the Border Patrol HSIN website and approved before seeking reimbursement. A list of all overtime shifts approved in HSIN and the timesheets for those shifts must accompany all overtime invoices sent for reimbursement. The Clallam County Sheriff’s Office reserves the right to amend the grant or transfer funding under this LOU to other partner agencies if not used by PAPD during the grant period. This award’s performance period commenced September 1, 2026, and will end July 31, 2028, unless extended. Extended performance periods may be incorporated by notice or amendment from Washington State without altering other conditions of the agreement. It is further understood that PAPD must submit an invoice along with pertinent documentation to Clallam County Sheriff’s Office in person, by mail: 223 E. 4th Street, Suite 12, Port Angeles, WA 98362, or by email: judy.minnoch@clallamcountywa.org and that Clallam County Sheriff’s Office will reimburse PAPD upon receipt of funds from Washington State Military Department. ________________________________________ Date ______________________________ Brian King, Sheriff ____________________________________ ____ Date ______________________________ Brian Smith, Chief of Police October 6, 2026 E - 166 Date: October 6, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Temporary On-Call Professional Engineering Services PSA-2026-41 Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This project directly aligns with the Strategic Focus Area #2 – Citywide Resource Optimization. Background / Analysis: This recommendation is intended to provide additional resources to the Public Works and CED departments as may be needed due to vacant positions currently within the Engineering Division. Staff is navigating through an informal procurement process to obtain these temporary services which are not expected to extend beyond March 31, 2027, and not to exceed $100,000.00. In the event additional services become necessary beyond this date, a more formal procurement process will be released with separate agreements coming back to Council at a later date. These services are necessary to ensure timely and appropriate responses are provided to permitting and development applicants as well as staff that are actively managing various City projects and contracts. These services will also ensure the City remains in full compliance with RCW 18.43.010 (licensing requirement for anyone practicing engineering) and RCW 39.80 (competitive procurement for public engineering contracts.) Summary: Staff is seeking City Council approval to authorize a short-term professional services agreement to provide On-Call Professional Engineering service support to the Public Works and Community & Economic Development (CED) Departments in an amount not to exceed $100,000.00. Strategic Plan: This proposal directly aligns with Strategic Focus Area #2 – Citywide Resource Optimization. Funding: Funding in the amount of $100,000.00, including taxes and accessories, is identified in the 2026 budget in the Engineering Division from savings resulting from staffing vacancies. Any costs incurred from services provided to City utilities will be allocated to the appropriate division. Recommendation: 1) Authorize the City Manager to approve and execute a professional services agreement to an appropriate firm as selected by staff through a competitive informal procurement process through utilization of our MRSC Roster in an amount not to exceed $100,000.00, to administer the agreement and to make minor modifications as may be necessary. October 6, 2026 E - 167 Funding Overview: Funding in the amount of $100,000.00, including taxes and accessories, is identified in the 2026 budget in the Engineering Division from savings resulting from staffing vacancies. Any costs incurred from services provided to City utilities will be allocated to the appropriate division Attachment(s): None October 6, 2026 E - 168 1 Date: October 6, 2026 To: City Council From: Nathan A. West, City Manager Calvin W. Goings, Deputy City Manager Sheida Sahandy, City Attorney Shannen Cartmel, CED Manager Subject: Managed Sheltering RFP Response Presentation (RFPSVC-2026-24) Relationship to Strategic Plan: The 2026-2027 Strategic Plan (Resolution 04-26) was approved by the City Council on April 7, 2026. This item aligns with Strategic Focus Area #3B, which involves implementing actions outlined in the 2025 Housing Action Plan (HAP) Periodic Update. Specifically, the HAP focuses on developing strategies to improve housing affordability and minimize displacement. Background/Analysis: During the April 7, 2026, City Council meeting, the following motion was passed: “Direct the City Manager to prepare a proposal on managed sheltering, including options for sanctioned encampments and safe parking and to report back to City Council for consideration during the second meeting in May.” On July 2, 2026, staff issued the corresponding request for proposals (RFP). After extending the application period twice, the City did receive an application on the final day. One proposal was received on August 18, 2026, entitled OlyCAP Dignity Bus. Staff have now arranged for a presentation by the proposer to present the RFP to Council. Staff previously shared the written proposal on August 28 so that Council would have time for review well in advance of the presentation. Funding Overview: Funding possibilities can be discussed following the presentation. Attachment: OlyCAP Dignity Bus Proposal Summary: At the April 7, 2026, City Council meeting, the following motion was passed: “Direct the City Manager to prepare a proposal on managed sheltering, including options for sanctioned encampments and safe parking and to report back to City Council for consideration during the second meeting in May.” On July 2, 2026, staff issued the corresponding request for proposals. One proposal was received on August 18, 2026 entitled OlyCAP Dignity Bus. Strategic Plan: This item aligns with Strategic Focus Area #3 – Housing. Funding: Funding possibilities can be discussed following the presentation. Recommendations: 1.) Presentation 2.) Council discussion and direction October 6, 2026 I - 1 October 6, 2026 I - 2 October 6, 2026 I - 3 08/18/2026 October 6, 2026 I - 4 October 6, 2026 I - 5 October 6, 2026 I - 6 October 6, 2026 I - 7 October 6, 2026 I - 8 October 6, 2026 I - 9 October 6, 2026 I - 10 October 6, 2026 I - 11 October 6, 2026 I - 12 October 6, 2026 I - 13 October 6, 2026 I - 14 October 6, 2026 I - 15 October 6, 2026 I - 16 October 6, 2026 I - 17 October 6, 2026 I - 18 October 6, 2026 I - 19 October 6, 2026 I - 20 October 6, 2026 I - 21 October 6, 2026 I - 22 October 6, 2026 I - 23 October 6, 2026 I - 24 October 6, 2026 I - 25 October 6, 2026 I - 26 1 Date: October 6, 2026 To: City Council From: Nathan A. West, City Manager Calvin W. Goings, Deputy City Manager Sarina Carrizosa, Finance Director Sheida Sahandy, City Attorney Brian Smith, Police Chief Subject: Public Defense Interlocal Agreement Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by City Council on October 1, 2024. This issue aligns with the City of Port Angeles Strategic Plan Focus Area #1 -“Improve Public Safety and Peace of Mind in our Community.” Background / Analysis: Clallam County (the “County”) and the City of Port Angeles (the “City”) are parties to an Interlocal Agreement between Clallam County and the City of Port Angeles Regarding Criminal Justice Services, effective January 1, 2016, (the “Original Agreement”). The Original Agreement was amended by Amendment 1 to Criminal Justice Services Interlocal Agreement Between the City of Port Angeles and Clallam County dated as of January 1, 2026, and then extended to the end of October by City Council on June 23, 2026. Representatives of the City and County have been engaged in negotiations for agreements pursuant to which the County would provide the City criminal justice services to cover prosecutions, public defense, courts and jail services. City staff have recommended that the previous agreement that included all Summary: This is a placeholder item in anticipation of a mutually agreed upon draft of the Public Defense Interlocal Agreement with Clallam County. At the time this memo was produced the legal drafting of a mutually agreed upon document was still underway. Both Clallam County and the City of Port Angeles have tentatively agreed upon the cost methodology of the agreement. It is anticipated a final draft will be provided prior to the meeting and approval will be sought to execute and deliver the Interlocal Cooperation Agreement among the City of Port Angeles, Clallam County, and the Clallam County for Public Defense services through Clallam Public Defenders (CPD) office. Strategic Plan: The procurement of public defense services aligns with the City of Port Angeles Strategic Plan Focus Area #1 -“Improve Public Safety and Peace of Mind in our Community.” Funding: The City’s 2026 Budget includes $1,157,600 for all criminal justice services. The total cost to the City in 2026 for Public Defense services only is estimated to be $379,713.37. Once all agreements for criminal justice services provided by the County are complete staff will provide a final update to Council on any needed Budget action. Recommendation: 1) Approve the Public Defense ILA between the City of Port Angeles, Clallam County, and Clallam Public Defenders office, and 2) authorize the City Manager to sign the agreement and make such minor changes as deemed necessary to affect the intent of this authorization. October 6, 2026 I - 27 2 criminal justice services into one ILA be separated into four agreements for each service to better track costs and monitor the needs of these specific services. The Public Defense ILA, incorporated as an attachment to this memorandum is the third of these agreements that has been completed and covers the term of October 29, 2026 through December 31, 2027. It ensures professional and cost-effective public defense services. City and County staff utilized the previously approved Prosecution and District Court I services agreement as a template and included terms specific to State law for public defense services when finalizing this ILA. Staff look forward to continuing to work with Clallam County to provide efficient, effective, transparent, and accountable criminal justice services to our communities. Funding Overview: The City’s 2026 Budget includes $1,157,600 for all criminal justice services. The total cost to the City in 2026 for Public Defense services only is estimated to be $379,713.37. Once all agreements for criminal justice services provided by the County are complete Staff will provide a final update to Council on any needed Budget action. Attachment: Attachment: Interlocal Cooperation Agreement between the City of Port Angeles, and Clallam County for Public Defense Services (To be made available prior to the Council meeting). October 6, 2026 I - 28 1 Date: October 6, 2026 To: City Council From: Nathan A. West, City Manager Subject: No Smoking on City Properties Discussion Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by City Council on October 1, 2024. Discussion should consider correlation of action to the Strategic Plan. Background / Analysis: During the September 15, 2026 meeting, Council approved by consensus, a request from Council member Miller to add a topic for future discussion to a future agenda, a discussion on an ordinance related to smoking and vaping on City property. Staff will be prepared to provide input and options as necessary. Funding Overview: N/A. Summary: During the September 15, 2026 meeting, Council approved by consensus, a request from Council member Miller to add a topic for future discussion to a future agenda, a discussion on no smoking on City properties. Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by City Council on October 1, 2024. Funding: N/A Recommendation: Discuss options and potential action to create smoke-free outdoor areas. October 6, 2026 I - 29 1 Date: October 6, 2026 To: City Council From: Nathan A. West, City Manager Subject: Invitation to Joint Meeting with Clallam County, the Port of Port Angeles, and Clallam P.U.D. Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This project directly aligns with the Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity and #1 – Community Resilience. Background / Analysis: The County and the Port of Port Angeles have invited the City to attend a joint meeting with Commissioners from Clallam County, the Port of Port Angeles, and Clallam P.U.D to discuss important issues and priorities affecting Clallam County. The invitation shares that the purpose of the meeting is to provide an opportunity for the participating organizations to come together, share information, discuss issues of mutual importance, and identify opportunities for coordination and collaboration in District II. The meeting is set for October 26, 2026, from 11:00 a.m. to 2:30 p.m. The County has asked that the City respond with a list of the representatives who plan to attend no later than Friday, October 9, 2026. Staff has recommended that Council appoint three (3) Council members to represent the City at the upcoming meeting, however, if Council so chooses, we are also happy to notice the meeting in order to allow four or more to attend. Funding Overview: N/A. Attachment: 1.Port of Port Angeles Invitation 2.Clallam County Invitation Summary: The City of Port Angeles has been invited to participate in the Joint District 2 Meeting between Clallam County, Clallam County Public Utility District and the Port of Port Angeles. Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This project directly aligns with the Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity and #1 – Community Resilience. Funding: N/A. Recommendation: 1) Council discussion; and 2) appoint three members of Council to attend. October 6, 2026 I - 30 Mayor Kate Dexter, and Members of the Port Angeles City Council 321 East Fifth Street Port Angeles, WA 98362 September 22, 2026 Port Angeles, WA Dear Mayor Dexter and Members of the Port Angeles City Council: On behalf of the Clallam County Board of Commissioners, the Commission of Public Utility District No. 1 of Clallam County, and the Port of Port Angeles Commission, we would like to extend an invitation to the City Council and City Leadership Team to participate in our Joint Commission Meeting on October 26, 2026, from 11 AM to 2:30 PM. Over the past year, our three agencies have established a series of joint executive and commission-level meetings to strengthen communication, improve interagency coordination, and identify opportunities for collaboration on issues of regional significance. As this effort has evolved, we have organized future Joint Commission Meetings around the geographic focus areas represented by Clallam County's Commissioner Districts. The October 26 meeting will focus on District 2, including the City of Port Angeles and surrounding communities. Anticipated topics include regional infrastructure, economic development, regional transportation needs, utility planning, workforce development, educational opportunities and challenges, resiliency initiatives, and other issues that benefit from coordinated public-sector leadership. Because several of these topics directly affect the City of Port Angeles, we believe City participation will strengthen the discussion and help identify opportunities for alignment on shared priorities. We would be honored to welcome the Port Angeles City Council and Leadership Team to join us for this conversation. The October meeting represents the first implementation of a district-focused approach to the Joint Commission process, bringing together agencies, jurisdictions, and community partners most closely connected to the issues affecting a particular area of October 6, 2026 I - 31 Clallam County. Future district-focused meetings may include participation from municipalities, tribal governments, educational institutions, and other partner organizations as appropriate. We appreciate the City's leadership and partnership, and we look forward to your participation on October 26. Additional meeting details and agenda materials will be provided in advance of the meeting. Thank you for your continued service to the residents of the City of Port Angeles and Clallam County. Respectfully, Todd Mielke County Administrator Clallam County Sean Worthington General Manager Public Utility District No. 1 of Clallam County Paul Jarkiewicz Chief Executive Officer Port of Port Angeles CC: Nathan West, City Manager Calvin Goings, Deputy City Manager Kari Martinez-Bailey, City Clerk October 6, 2026 I - 32 From:Gores, Loni To:Medolyn Evans; Kari Martinez-Bailey Cc:Gores, Loni; jennar@portofpa.com Subject:Joint CC/Port/PUD meeting - October 26 - City of PA invite Date:Tuesday, September 22, 2026 1:18:27 PM [CAUTION - EXTERNAL EMAIL] City of Port Angeles Council and Manager West: Please join us for a joint meeting with Commissioners from Clallam County, the Port of Port Angeles, and Clallam PUD to discuss important issues and priorities affecting Clallam County. The meeting is scheduled for: Date: Monday, October 26, 2026 Time: 11:00 a.m. Location: Clallam County Board of Commissioners Board Room, 223 East 4th Street, Room 160, Port Angeles, WA This meeting will provide an opportunity for the participating organizations to come together, share information, discuss issues of mutual importance, and identify opportunities for coordination and collaboration in District II. We hope you will be able to join us. Please let me know the names of the representatives that will be available to attend no later than Friday, October 9, 2026. Loni Gores, Clerk Loni Gores Clerk of the Board Commissioners Office 223 East 4th Street, Suite 4 Port Angeles, WA 98362 Phone: 360-417-2256 October 6, 2026 I - 33 Date: October 6, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: 2026-2028 Pole Testing, Contract Award (CON-2026-03) Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This project directly aligns with the Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: Many of the City’s wooden utility poles are over 40 years old. An accurate assessment of their condition cannot be made by visual inspection only. It is necessary to drill test holes and inspect for internal decay. When a pole is still solid, treating the test holes prevents decay from starting and extends the life of the pole. Projects in previous years discovered several rotten poles with no outward appearance of deterioration. In order to minimize deterioration of the City’s wooden utility poles, staff utilize a regular cycle of inspecting and testing approximately 10 percent of the City's wooden poles for internal decay each year and cycle through the system once every 10 years. Utilities employing routine pole inspections and treatments find that wooden pole life can be extended by decades. On September 11th, 2026, bids for pole inspections were solicited on a unit basis for a fixed amount per pole from all companies on the Municipal Research and Services Center (MRSC), and posted to the City’s website. On September 30th, 2026, two bids were received and opened with Pacific Pole Inspection, LLC of Kelso, WA being the lowest bidder. The estimated quantity of poles and services required will be reduced as necessary so as not to exceed the annual contract value of $60,000. Two companies responded with bids based on testing and treatment services for approximately 2,000 poles total over the 3 year period. Pacific Pole Inspection, LLC is the lowest responsible bidder. Summary: Staff is seeking Council approval to award a three year maintenance contract to Pacific Pole Inspection, LLC of Kelso, WA in an annual not-to-exceed amount of $60,000, for pole testing contract CON-2026-03. Staff utilize a regular cycle of inspecting and testing approximately 10 percent of the City's wooden poles for internal decay each year and cycle through the system once every 10 years. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Funding: Funding is available in the 2026-2028 Light Operations budget 401-7180-533-4810 in the annual not-to-exceed amount of $60,000.00, including taxes. Recommendation: Award a three year contract to Pacific Pole Inspection, LLC of Kelso, WA, for the 2026-2028 Pole Testing contract CON-2026-03 in an annual not-to-exceed amount of $60,000.00, a total not to exceed $180,000.00 over 3 years, including taxes, and authorize the City Manager to sign all contract-related documents, to administer the contract, and to make minor modifications as necessary. October 6, 2026 J - 1 A summary of the bids for the estimated quantity of poles to be tested and all pole treatment options is shown in the table below: Contractor Total Bid Amount, including tax Pacific Pole Inspection, LLC – Kelso, WA $185,549.96 Intec Services, Inc – Fort Collins, CO $218,768.23 2026-2028 Budgeted Not to Exceed amount $180,000.00 Funding Overview: Funding is available in the 2026-2028 Light Operations budget 401-7180-533- 4810 in the annual not-to-exceed amount of $60,000.00, including taxes. Attachment: none October 6, 2026 J - 2 Date: October 6, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: PSA-2026-33 Traffic Circle Program Project (TR0220) Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This project directly aligns with Strategic Focus Area #4 and furthers the City’s approved 2027-2032 Capital Facilities Plan through project TR0220 – Traffic Circle Program. Background / Analysis: On January 21, 2025, City Council accepted a grant from Washington State Department of Transportation (WSDOT) 2024 City Safety Program for the Traffic Circle Program Project. This project will address crash history on local streets that are one block off US 101. The Traffic Circle Program Project (TR0220) is included in the approved 2026-2031 Capital Facilities Plan and includes the following improvements: •Mini traffic circles and curb ramps at various locations along Laurel Street, 6th Street, and East 2nd Street •Visibility enhancements to existing stop control along Laurel Street •Marked crosswalk and curb ramps at the intersection of Laurel and 5th Streets A Request for Qualifications (RFQ) was advertised in the Peninsula Daily News on July 21, 2026, and July 28, 2026. Two firms submitted statements of qualifications and were evaluated and interviewed for the award. In evaluating the statement of qualifications, Transpo Group USA of Kirkland, WA, was Summary: Staff is seeking City Council approval to award a Professional Services Contract PSA-2026- 33 to Transpo Group USA of Kirkland, WA in the not-to-exceed amount of $284,213.00, including applicable taxes, for the preliminary engineering design work for the Traffic Circle Program Project (TR0220). This project is included in the approved 2027-2032 Capital Facilities Plan and will address the frequency of crashes on local streets that are one block off US 101. Strategic Plan: This proposed project directly aligns with the Strategic Focus Area #4 - Infrastructure Development, Maintenance and Connectivity. Funding: The Traffic Circle Program Project TR0220 is identified in the approved 2027-2032 Capital Facilities Plan. The preliminary engineering phase of this project is fully funded through a Washington State Department of Transportation (WSDOT) Highway Safety Improvement Program Grant in the amount of $325,000.00. Recommendation: Award the Professional Services Agreement, PSA-2026-33, to Transpo Group USA of Kirkland, WA in the not-to-exceed amount of $284,213.00, including applicable taxes, and authorize the City Manager to execute all contract-related documents, to administer the contract, and to make minor modifications as necessary. October 6, 2026 J - 3 determined to be the most qualified. Engineering staff worked with Transpo Group USA to develop a detailed scope of work and negotiate a maximum not-to-exceed contract amount of $284,213.88 based on the anticipated support services. Funding Overview: The Traffic Circle Program Project TR0220 is identified in the approved 2027- 2032 Capital Facilities Plan. The preliminary engineering phase of this project is fully funded through a Washington State Department of Transportation (WSDOT) Highway Safety Improvement Program Grant in the amount of $325,000. Summary of tasks and fees for the TR0220 – Traffic Circle Program project: Task Budget 1 - Project Management $13,028.00 2 – Design Support Services $24,219.00 3 – 30% Channelization Concept Refinement $46,899.00 4 – Final Design Plans, Specifications, and Estimate $105,854.00 5 – Bid and Award Support $3,540.00 6 – Subconsultant Services (Survey and Stormwater) $89,673.00 Reimbursable Expenses $1,000.00 Total $284,213.00 Attachment(s): Draft PSA-2026-33, Exhibit A – Scope of Work, Memorandum, and Prime Consultant Cost computations October 6, 2026 J - 4 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Agreement Number: PSA-2026-33 Firm/Organization Legal Name (do not use dba’s): Transpo Group USA, Inc. Address 12131 113th Ave NE #203, Kirkland, WA 98034 Federal Aid Number HSIP-000S(740) UBI Number 603-258-009 Federal TIN or SSN Number 46-1523472 Execution Date Completion Date 1099 Form Required Yes No Federal Participation Yes No Project Title Systemic Intersection Improvements - TR0220 Traffic Circle Program Description of Work Transpo Group USA, Inc. (Consultant), will provide engineering services to the City of Port Angeles (City) for the design of circular intersection control improvements, visibility treatments at existing stop controlled intersections, and crossing improvements in the City of Port Angeles, Washington. Improvements in the scope meet the scope of the City’s programmed TR 0220 project and funded by a WSDOT Highway Safety Improvement Program (HSIP), consisting of federal funds. The Consultant will lead the project and work in coordination with subconsultants, Wilson Engineering, to provide a consistent overall project design across engineering disciplines. Subconsultant efforts will include stormwater management improvement support and site survey. Yes No DBE Participation Total Amount Authorized: $284,213.88 Yes No MBE Participation Management Reserve Fund: Yes Yes No WBE Participation No SBE Participation Maximum Amount Payable: $284,213.88 Index of Exhibits Exhibit A Exhibit B Exhibit C Exhibit D Scope of Work DBE Participation Preparation and Delivery of Electronic Engineering and Other Data Prime Consultant Cost Computations Exhibit E Sub-consultant Cost Computations Title VI Assurances Certification Documents Liability Insurance Increase Alleged Consultant Design Error Procedures Consultant Claim Procedures Agreement Number: PSA-2026-33 Exhibit F Exhibit G Exhibit H Exhibit I Exhibit J October 6, 2026 J - 5 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 2 of 14 THIS AGREEMENT, made and entered into as shown in the “Execution Date” box on page one (1) of this AGREEMENT, between the City of Port Angeles , hereinafter called the “AGENCY,” and the “Firm / Organization Name” referenced on page one (1) of this AGREEMENT, hereinafter called the “CONSULTANT.” WHEREAS, the AGENCY desires to accomplish the work referenced in “Description of Work” on page one (1) of this AGREEMENT and hereafter called the “SERVICES;” and does not have sufficient staff to meet the required commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary SERVICES; and WHEREAS, the CONSULTANT represents that they comply with the Washington State Statutes relating to professional registration, if applicable, and has signified a willingness to furnish consulting services to the AGENCY. NOW, THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein, or attached and incorporated and made a part hereof, the parties hereto agree as follows: I. General Description of Work The work under this AGREEMENT shall consist of the above-described SERVICES as herein defined, and necessary to accomplish the completed work for this project. The CONSULTANT shall furnish all services, labor, and related equipment and, if applicable, sub-consultants and subcontractors necessary to conduct and complete the SERVICES as designated elsewhere in this AGREEMENT. II. General Scope of Work The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit “A” attached hereto and by this reference made a part of this AGREEMENT. The General Scope of Work was developed utilizing performance based contracting methodologies. III. General Requirements All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and/or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress, and presentation meetings with the AGENCY and/or such State, Federal, Community, City, or County officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days’ notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit “A.” The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will outline in written and graphical form the various phases and the order of performance of the SERVICES in sufficient detail so that the progress of the SERVICES can easily be evaluated. The CONSULTANT, any sub-consultants, and the AGENCY shall comply with all Federal, State, and local laws, rules, codes, regulations, and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of Washington. Agreement Number: PSA-2026-33 October 6, 2026 J - 6 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 3 of 14 Participation for Disadvantaged Business Enterprises (DBE) or Small Business Enterprises (SBE), if required, per 49 CFR Part 26, shall be shown on the heading of this AGREEMENT. If DBE firms are utilized at the commencement of this AGREEMENT, the amounts authorized to each firm and their certification number will be shown on Exhibit “B” attached hereto and by this reference made part of this AGREEMENT. If the Prime CONSULTANT is a DBE certified firm they must comply with the Commercial Useful Function (CUF) regulation outlined in the AGENCY’s “DBE Program Participation Plan” and perform a minimum of 30% of the total amount of this AGREEMENT. It is recommended, but not required, that non-DBE Prime CONSULTANTS perform a minimum of 30% of the total amount of this AGREEMENT. In the absents of a mandatory DBE goal, a voluntary SBE goal amount of ten percent of the Consultant Agreement is established. The Consultant shall develop a SBE Participation Plan prior to commencing work. Although the goal is voluntary, the outreach efforts to provide SBE maximum practicable opportunities are not. The CONSULTANT, on a monthly basis, shall enter the amounts paid to all firms (including Prime) involved with this AGREEMENT into the wsdot.diversitycompliance.com program. Payment information shall identify any DBE Participation. All Reports, PS&E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned. All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit “C – Preparation and Delivery of Electronic Engineering and other Data.” All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for these SERVICES, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or on behalf of the AGENCY of any such instruments of service, not occurring as a part of this SERVICE, shall be without liability or legal exposure to the CONSULTANT. Any and all notices or requests required under this AGREEMENT shall be made in writing and sent to the other party by (i) certified mail, return receipt requested, or (ii) by email or facsimile, to the address set forth below: If to AGENCY: If to CONSULTANT: Name: Timothy Ha yes, P.E. Name: Agency: City of Por t Angeles Agency: Address: 321 East 5th Street Address: City: Port Angeles State: WA Zip: 98362 City: State: Zip: Email: thayes@city ofpa.us Email: Phone: 360-417-482 7 Phone: Facsimile: 360-417- 4709 Facsimile: IV. Time for Beginning and Completion The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing by the AGENCY. All work under this AGREEMENT shall be completed by the date shown in the heading of this AGREEMENT titled “Completion Date.” The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD, governmental actions, or other conditions beyond the control of the CONSULTANT. A prior supplemental AGREEMENT issued by the AGENCY is required to extend the established completion time. October 6, 2026 J - 7 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 4 of 14 V. Payment Provisions The CONSULTANT shall be paid by the AGENCY for completed SERVICES rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for SERVICES performed or SERVICES rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete SERVICES, specified in Section II, “Scope of Work”. The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31 (www.ecfr.gov). The estimate in support of the Cost Plus Fixed Fee amount is attached hereto as Exhibits “D” and “E” and by this reference made part of this AGREEMENT. A. Actual Costs: Payment for all consulting services for this PROJECT shall be on the basis of the CONSULTANT’S actual cost plus a fixed fee. The actual cost shall include direct salary cost, indirect cost rate, and direct non-salary costs. 1. Direct (RAW) Labor Costs: The Direct (RAW) Labor Cost is the direct salary paid to principals, professional, technical, and clerical personnel for the time they are productively engaged in work necessary to fulfill the terms of this AGREEMENT. The CONSULTANT shall maintain support data to verify the direct salary costs billed to the AGENCY. 2. Indirect Cost Rate (ICR) Costs: ICR Costs are those costs, other than direct costs, which are included as such on the books of the CONSULTANT in the normal everyday keeping of its books. Progress payments shall be made at the ICR rates shown in attached Exhibits “D” and “E” of this AGREEMENT. Total ICR payment shall be based on Actual Costs. The AGENCY agrees to reimburse the CONSULTANT the actual ICR costs verified by audit, up to the Maximum Total Amount Payable, authorized under this AGREEMENT, when accumulated with all other Actual Costs. A summary of the CONSULTANT’S cost estimate and the ICR percentage is shown in Exhibits “D” and “E”, attached hereto and by this reference made part of this AGREEMENT. The CONSULTANT (prime and all A&E sub-consultants) will submit to the AGENCY within six (6) months after the end of each firm’s fiscal year, an ICR schedule in the format required by the AGENCY (cost category, dollar expenditures, etc.) for the purpose of adjusting the ICR rate for billings received and paid during the fiscal year represented by the ICR schedule. It shall also be used for the computation of progress payments during the following year and for retroactively adjusting the previous year’s ICR cost to reflect the actual rate. The ICR schedule will be sent to Email: ConsultantRates@wsdot.wa.gov. Failure to supply this information by either the prime CONSULTANT or any of their A&E sub-consultants shall cause the AGENCY to withhold payment of the billed ICR costs until such time as the required information is received and an overhead rate for billing purposes is approved. The AGENCY’s Project Manager and/or the Federal Government may perform an audit of the CONSULTANT’S books and records at any time during regular business hours to determine the actual ICR rate, if they so desire. 3. Direct Non-Salary Costs: Direct Non-Salary Costs will be reimbursed at the Actual Cost to the CONSULTANT. (excluding Meals, which are reimbursed at the per diem rates identified in this section) These charges may include, but are not limited to, the following items: travel, printing, long distance telephone, supplies, computer charges and fees of sub-consultants. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by the AGENCY. The CONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with WSDOT’s Accounting Manual M 13-82, Chapter 10 – Travel Rules and Procedures, and revisions thereto. Air, train, and rental car costs shall be reimbursed in accordance with 48 Code of Federal Regulations (CFR) Part 31.205-46 “Travel Costs.” The billing for Direct Non-Salary Costs shall include an itemized listing of the charges directly identifiable with the PROJECT. The CONSULTANT shall maintain the original supporting documents in their office. Copies of the original supporting documents shall be supplied to the AGENCY upon request. All above charges must be necessary for the services provided under this AGREEMENT. Agreement Number: PSA-2026-33 October 6, 2026 J - 8 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 5 of 14 4. Fixed Fee: The Fixed Fee, which represents the CONSULTANT’S profit, is shown in attached Exhibits “D” and “E” of this AGREEMENT. This fee is based on the Scope of Work defined in this AGREEMENT and the estimated person-hours required to perform the stated Scope of Work. In the event the CONSULTANT enters into a supplemental AGREEMENT for additional work, the supplemental AGREEMENT may include provisions for the added costs and an appropriate additional fee. The Fixed Fee will be prorated and paid monthly in proportion to the percentage of work completed by the CONSULTANT and reported in the Monthly Progress Reports accompanying the billings. Any portion of the Fixed Fee earned but not previously paid in the progress payments will be covered in the final payment, subject to the provisions of Section IX entitled “Termination of Agreement.” 5. Management Reserve Fund (MRF): The AGENCY may desire to establish MRF to provide the Agreement Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed the lesser of $100,000 or 10% of the Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included for the MRF is shown in the heading of this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in excess of the MRF shall be made in accordance with Section XIII, “Extra Work.” 6. Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and the MRF. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in Section XIII, “Extra Work.” No minimum amount payable is guaranteed under this AGREEMENT. B. Monthly Progress Payments: The CONSULTANT may submit billings to the AGENCY for reimbursement of Actual Costs plus the ICR and calculated fee on a monthly basis during the progress of the work. Such billings shall be in a format approved by the AGENCY and accompanied by the monthly progress reports required under Section III, “General Requirements” of this AGREEMENT. The billings will be supported by an itemized listing for each item including Direct (RAW) Labor, Direct Non-Salary, and allowable ICR Costs to which will be added the prorated Fixed Fee. To provide a means of verifying the billed Direct (RAW) Labor costs for CONSULTANT employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles, Direct (RAW) Labor rates, and present duties of those employees performing work on the PROJECT at the time of the interview. C. Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT, contingent, if applicable, upon receipt of all PS&E, plans, maps, notes, reports, electronic data and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit; all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to the AGENCY within thirty (30) calendar days of notice of the overpayment. Such refund shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. The CONSULTANT has twenty (20) working days after receipt of the final POST AUDIT to begin the appeal process to the AGENCY for audit findings. Agreement Number: PSA-2026-33 October 6, 2026 J - 9 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 6 of 14 D. Inspection of Cost Records: The CONSULTANT and their sub-consultants shall keep available for inspection by representatives of the AGENCY and the United States, for a period of six (6) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, claim or audit arising out of, in connection with, or related to this AGREEMENT is initiated before the expiration of the six (6) year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed. An interim or post audit may be performed on this AGREEMENT. The audit, if any, will be performed by the State Auditor, WSDOT’s Internal Audit Office and/or at the request of the AGENCY’s Project Manager. VI. Sub-Contracting The AGENCY permits subcontracts for those items of SERVICES as shown in Exhibit “A” attached hereto and by this reference made part of this AGREEMENT. The CONSULTANT shall not subcontract for the performance of any SERVICE under this AGREEMENT without prior written permission of the AGENCY. No permission for subcontracting shall create, between the AGENCY and sub-consultant, any contract or any other relationship. Compensation for this sub-consultant SERVICES shall be based on the cost factors shown on Exhibit “E” attached hereto and by this reference made part of this AGREEMENT. The SERVICES of the sub-consultant shall not exceed its maximum amount payable identified in each sub- consultant cost estimate unless a prior written approval has been issued by the AGENCY. All reimbursable direct labor, indirect cost rate, direct non-salary costs and fixed fee costs for the sub-consultant shall be negotiated and substantiated in accordance with section V “Payment Provisions” herein and shall be memorialized in a final written acknowledgement between the parties. All subcontracts shall contain all applicable provisions of this AGREEMENT, and the CONSULTANT shall require each sub-consultant or subcontractor, of any tier, to abide by the terms and conditions of this AGREEMENT. With respect to sub-consultant payment, the CONSULTANT shall comply with all applicable sections of the STATE’s Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011. The CONSULTANT, sub-recipient, or sub-consultant shall not discriminate on the basis of race, color, national origin, or sex in the performance of this AGREEMENT. The CONSULTANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this AGREEMENT, which may result in the termination of this AGREEMENT or such other remedy as the recipient deems appropriate. VII. Employment and Organizational Conflict of Interest The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct from this AGREEMENT price or consideration or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen’s Agreement Number: PSA-2026-33 October 6, 2026 J - 10 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 7 of 14 Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a third party as a consequence of any act or omission on the part of the CONSULTANT’s employees or other persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the CONSULTANT. The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of this AGREEMENT, any professional or technical personnel who are, or have been, at any time during the period of this AGREEMENT, in the employ of the United States Department of Transportation or the AGENCY, except regularly retired employees, without written consent of the public employer of such person if he/she will be working on this AGREEMENT for the CONSULTANT. VIII. Nondiscrimination During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, sub-consultants, subcontractors and successors in interest, agrees to comply with the following laws and regulations: • Title VI of the Civil Rights Act of 1964 • Civil Rights Restoration Act of 1987 (42 U.S.C. Chapter 21 Subchapter V § 2000d (Public Law 100-259) through 2000d-4a) • American with Disabilities Act of 1990 • Federal-aid Highway Act of 1973 (42 U.S.C. Chapter 126 § 12101 et. seq.) (23 U.S.C. Chapter 3 § 324) • 23 CFR Part 200 • Rehabilitation Act of 1973 • 49 CFR Part 21 (29 U.S.C. Chapter 16 Subchapter V § 794) • 49 CFR Part 26 • Age Discrimination Act of 1975 • RCW 49.60.180 (42 U.S.C. Chapter 76 § 6101 et. seq.) In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit “F” attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit “F” in every sub-contract, including procurement of materials and leases of equipment, unless exempt by the Regulations or directives issued pursuant thereto. IX. Termination of Agreement The right is reserved by the AGENCY to terminate this AGREEMENT at any time with or without cause upon ten (10) days written notice to the CONSULTANT. In the event this AGREEMENT is terminated by the AGENCY, other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT for actual hours charged and any appropriate fixed fee percentage at the time of termination of this AGREEMENT, plus any direct non-salary costs incurred up to the time of termination of this AGREEMENT. No payment shall be made for any SERVICES completed after ten (10) days following receipt by the CONSULTANT of the notice to terminate. If the accumulated payment made to the CONSULTANT prior to Notice of Termination exceeds the total amount that would be due when computed as set forth in paragraph two (2) of this section, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess paid. If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall not apply. In the event of a termination for default, the amount to be paid to the CONSULTANT shall be determined by the AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing SERVICES to the date of termination, the amount of SERVICES originally required which was satisfactorily completed to October 6, 2026 J - 11 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 8 of 14 date of termination, whether that SERVICE is in a form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of employing another firm to complete the SERVICES required and the time which may be required to do so, and other factors which affect the value to the AGENCY of the SERVICES performed at the time of termination. Under no circumstances shall payment made under this subsection exceed the amount, which would have been made using the formula set forth in paragraph two (2) of this section. If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT’s failure to perform is without the CONSULTANT’s or its employee’s fault or negligence, the termination shall be deemed to be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed for actual costs and appropriate fixed fee percentage in accordance with the termination for other than default clauses listed previously. The CONSULTANT shall, within 15 days, notify the AGENCY in writing, in the event of the death of any member, partner, or officer of the CONSULTANT or the death or change of any of the CONSULTANT’s supervisory and/or other key personnel assigned to the project or disaffiliation of any principally involved CONSULTANT employee. The CONSULTANT shall also notify the AGENCY, in writing, in the event of the sale or transfer of 50% or more of the beneficial ownership of the CONSULTANT within 15 days of such sale or transfer occurring. The CONSULTANT shall continue to be obligated to complete the SERVICES under the terms of this AGREEMENT unless the AGENCY chooses to terminate this AGREEMENT for convenience or chooses to renegotiate any term(s) of this AGREEMENT. If termination for convenience occurs, final payment will be made to the CONSULTANT as set forth in the second and third paragraphs of this section. Payment for any part of the SERVICES by the AGENCY shall not constitute a waiver by the AGENCY of any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the CONSULTANT, or for failure of the CONSULTANT to perform SERVICES required of it by the AGENCY. Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights with respect to any future act or omission by the CONSULTANT. X. Changes of Work The CONSULTANT shall make such changes and revisions in the completed work of this AGREEMENT as necessary to correct errors appearing therein, without additional compensation thereof. Should the AGENCY find it desirable for its own purposes to have previously satisfactorily completed SERVICES or parts thereof changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as herein provided under section XIII “Extra Work.” XI. Disputes Any disputed issue not resolved pursuant to the terms of this AGREEMENT shall be submitted in writing within 10 days to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this AGREEMENT; provided however, that if an action is brought challenging the Director of Public Works or AGENCY Engineer’s decision, that decision shall be subject to judicial review. If the parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the procedures found in Exhibit “J”. In the event that either party deem it necessary to institute legal action or proceeding to enforce any right or obligation under this AGREEMENT, this action shall be initiated in the Superior Court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto agree that all questions shall be resolved by application of Washington law and that the parties have the right of appeal from such decisions of the Superior Court in accordance with the laws of the State of Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior Court of the State of Washington, situated in the county in which the AGENCY is located. October 6, 2026 J - 12 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 9 of 14 XII. Legal Relations The CONSULTANT, any sub-consultants, and the AGENCY shall comply with all Federal, State, and local laws, rules, codes, regulations and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of Washington. The CONSULTANT shall defend, indemnify, and hold The State of Washington (STATE) and the AGENCY and their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the negligence of, or the breach of any obligation under this AGREEMENT by, the CONSULTANT or the CONSULTANT’s agents, employees, sub consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable; provided that nothing herein shall require a CONSULTANT to defend or indemnify the STATE and the AGENCY and their officers and employees against and hold harmless the STATE and the AGENCY and their officers and employees from claims, demands or suits based solely upon the negligence of, or breach of any obligation under this AGREEMENT by the STATE and the AGENCY, their agents, officers, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the STATE and/or the AGENCY may be legally liable; and provided further that if the claims or suits are caused by or result from the concurrent negligence of (a) the CONSULTANT or the CONSULTANT’s agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT is legally liable, and (b) the STATE and/or AGENCY, their agents, officers, employees, sub-consultants, subcontractors and or vendors, of any tier, or any other persons for whom the STATE and or AGENCY may be legally liable, the defense and indemnity obligation shall be valid and enforceable only to the extent of the CONSULTANT’s negligence or the negligence of the CONSULTANT’s agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable. This provision shall be included in any AGREEMENT between CONSULTANT and any sub-consultant, subcontractor and vendor, of any tier. The CONSULTANT shall also defend, indemnify, and hold the STATE and the AGENCY and their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions by the CONSULTANT or the CONSULTANT’s agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable, in performance of the Work under this AGREEMENT or arising out of any use in connection with the AGREEMENT of methods, processes, designs, information or other items furnished or communicated to STATE and/or the AGENCY, their agents, officers and employees pursuant to the AGREEMENT; provided that this indemnity shall not apply to any alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions resulting from STATE and/or AGENCY’s, their agents’, officers’ and employees’ failure to comply with specific written instructions regarding use provided to STATE and/or AGENCY, their agents, officers and employees by the CONSULTANT, its agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable. The CONSULTANT’s relation to the AGENCY shall be at all times as an independent contractor. Notwithstanding any determination by the Executive Ethics Board or other tribunal, the AGENCY may, in its sole discretion, by written notice to the CONSULTANT terminate this AGREEMENT if it is found after due notice and examination by the AGENCY that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or any similar statute involving the CONSULTANT in the procurement of, or performance under, this AGREEMENT. The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT’s own employees or its agents against the STATE and /or the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51 RCW. This waiver has been mutually negotiated between the Parties. October 6, 2026 J - 13 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 10 of 14 Unless otherwise specified in this AGREEMENT, the AGENCY shall be responsible for administration of construction contracts, if any, on the project. Subject to the processing of a new sole source, or an acceptable supplemental AGREEMENT, the CONSULTANT shall provide On-Call assistance to the AGENCY during contract administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper construction techniques, job site safety, or any construction contractor’s failure to perform its work in accordance with the contract documents. The CONSULTANT shall obtain and keep in force during the terms of this AGREEMENT, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. Insurance Coverage A. Worker’s compensation and employer’s liability insurance as required by the STATE. B. Commercial general liability insurance written under ISO Form CG 00 01 12 04 or its equivalent with minimum limits of one million dollars ($1,000,000.00) per occurrence and two million dollars ($2,000,000.00) in the aggregate for each policy period. C. Business auto liability insurance written under ISO Form CG 00 01 10 01 or equivalent providing coverage for any “Auto” (Symbol 1) used in an amount not less than a one million dollar ($1,000,000.00) combined single limit for each occurrence. Excepting the Worker’s Compensation Insurance and any Professional Liability Insurance, the STATE and AGENCY, their officers, employees, and agents will be named on all policies of CONSULTANT and any sub- consultant and/or subcontractor as an additional insured (the “AIs”), with no restrictions or limitations concerning products and completed operations coverage. This coverage shall be primary coverage and non-contributory and any coverage maintained by the AIs shall be excess over, and shall not contribute with, the additional insured coverage required hereunder. The CONSULTANT’s and the sub-consultant’s and/or subcontractor’s insurer shall waive any and all rights of subrogation against the AIs. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements required by this AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the execution of this AGREEMENT to: Name: Lucy Hanley Agency: City of Port Angeles Address: 321 East 5th Street City: Port Angeles State: WA Zip: 98362 Email: lhanley@cityofpa.us Phone: 360-417-4541 Facsimile: 360-417-4709 No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY. The CONSULTANT’s professional liability to the AGENCY, including that which may arise in reference to section IX “Termination of Agreement” of this AGREEMENT, shall be limited to the accumulative amount of the authorized AGREEMENT amount or one million dollars ($1,000,000.00), whichever is greater, unless the limit of liability is increased by the AGENCY pursuant to Exhibit H. In no case shall the CONSULTANT’s professional liability to third parties be limited in any way. October 6, 2026 J - 14 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 11 of 14 The parties enter into this AGREEMENT for the sole benefit of the parties, and to the exclusion of any third party, and no third party beneficiary is intended or created by the execution of this AGREEMENT. The AGENCY will pay no progress payments under section V “Payment Provisions” until the CONSULTANT has fully complied with this section. This remedy is not exclusive; and the AGENCY may take such other action as is available to it under other provisions of this AGREEMENT, or otherwise in law. XIII. Extra Work A. The AGENCY may at any time, by written order, make changes within the general scope of this AGREEMENT in the SERVICES to be performed. B. If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the SERVICES under this AGREEMENT, whether or not changed by the order, or otherwise affects any other terms and conditions of this AGREEMENT, the AGENCY shall make an equitable adjustment in the: (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms and shall modify this AGREEMENT accordingly. C. The CONSULTANT must submit any “request for equitable adjustment,” hereafter referred to as “CLAIM,” under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final payment of this AGREEMENT. D. Failure to agree to any adjustment shall be a dispute under the section XI “Disputes” clause. However, nothing in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed. E. Notwithstanding the terms and conditions of paragraphs (A.) and (B.) above, the maximum amount payable for this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement to this AGREEMENT. XIV. Endorsement of Plans If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering data furnished by them. XV. Federal Review The Federal Highway Administration shall have the right to participate in the review or examination of the SERVICES in progress. XVI. Certification of the Consultant and the Agency Attached hereto as Exhibit “G-1(a and b)” are the Certifications of the CONSULTANT and the AGENCY, Exhibit “G-2” Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions, Exhibit “G-3” Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying and Exhibit “G-4” Certificate of Current Cost or Pricing Data. Exhibit “G-3” is required only in AGREEMENT’s over one hundred thousand dollars ($100,000.00) and Exhibit “G-4” is required only in AGREEMENT’s over five hundred thousand dollars ($500,000.00.) These Exhibits must be executed by the CONSULTANT, and submitted with the master AGREEMENT, and returned to the AGENCY at the address listed in section III “General Requirements” prior to its performance of any SERVICES under this AGREEMENT. October 6, 2026 J - 15 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 12 of 14 XVII. Complete Agreement This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as a supplement to this AGREEMENT. XVIII. Execution and Acceptance This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements, representations, warranties, covenants, and AGREEMENT’s contained in the proposal, and the supporting material submitted by the CONSULTANT, and does hereby accept this AGREEMENT and agrees to all of the terms and conditions thereof. XIX. Protection of Confidential Information The CONSULTANT acknowledges that some of the material and information that may come into its possession or knowledge in connection with this AGREEMENT or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either chapter 42.56 RCW or other local, state or federal statutes (“State’s Confidential Information”). The “State’s Confidential Information” includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver’s license numbers, medical data, law enforcement records (or any other information identifiable to an individual), STATE and AGENCY source code or object code, STATE and AGENCY security data, non-public Specifications, STATE and AGENCY non-publicly available data, proprietary software, State security data, or information which may jeopardize any part of the project that relates to any of these types of information. The CONSULTANT agrees to hold the State’s Confidential Information in strictest confidence and not to make use of the State’s Confidential Information for any purpose other than the performance of this AGREEMENT, to release it only to authorized employees, sub-consultants or subcontractors requiring such information for the purposes of carrying out this AGREEMENT, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make it known to any other party without the AGENCY’s express written consent or as provided by law. The CONSULTANT agrees to release such information or material only to employees, sub-consultants or subcontractors who have signed a nondisclosure AGREEMENT, the terms of which have been previously approved by the AGENCY. The CONSULTANT agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to the State’s Confidential Information. Immediately upon expiration or termination of this AGREEMENT, the CONSULTANT shall, at the AGENCY’s option: (i) certify to the AGENCY that the CONSULTANT has destroyed all of the State’s Confidential Information; or (ii) returned all of the State’s Confidential Information to the AGENCY; or (iii) take whatever other steps the AGENCY requires of the CONSULTANT to protect the State’s Confidential Information. As required under Executive Order 00-03, the CONSULTANT shall maintain a log documenting the following: the State’s Confidential Information received in the performance of this AGREEMENT; the purpose(s) for which the State’s Confidential Information was received; who received, maintained and used the State’s Confidential Information; and the final disposition of the State’s Confidential Information. The CONSULTANT’s records shall be subject to inspection, review, or audit upon reasonable notice from the AGENCY. The AGENCY reserves the right to monitor, audit, or investigate the use of the State’s Confidential Information collected, used, or acquired by the CONSULTANT through this AGREEMENT. The monitoring, auditing, or investigating may include, but is not limited to, salting databases. October 6, 2026 J - 16 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 13 of 14 Violation of this section by the CONSULTANT or its sub-consultants or subcontractors may result in termination of this AGREEMENT and demand for return of all State’s Confidential Information, monetary damages, or penalties. It is understood and acknowledged that the CONSULTANT may provide the AGENCY with information which is proprietary and/or confidential during the term of this AGREEMENT. The parties agree to maintain the confidentiality of such information during the term of this AGREEMENT and afterwards. All materials containing such proprietary and/or confidential information shall be clearly identified and marked as “Confidential” and shall be returned to the disclosing party at the conclusion of the SERVICES under this AGREEMENT. The CONSULTANT shall provide the AGENCY with a list of all information and materials it considers confidential and/or proprietary in nature: (a) at the commencement of the term of this AGREEMENT; or (b) as soon as such confidential or proprietary material is developed. “Proprietary and/or confidential information” is not meant to include any information which, at the time of its disclosure: (i) is already known to the other party; (ii) is rightfully disclosed to one of the parties by a third party that is not acting as an agent or representative for the other party; (iii) is independently developed by or for the other party; (iv) is publicly known; or (v) is generally utilized by unaffiliated third parties engaged in the same business or businesses as the CONSULTANT. The parties also acknowledge that the AGENCY is subject to Washington State and federal public disclosure laws. As such, the AGENCY shall maintain the confidentiality of all such information marked proprietary and/ or confidential or otherwise exempt, unless such disclosure is required under applicable state or federal law. If a public disclosure request is made to view materials identified as “Proprietary and/or confidential information” or otherwise exempt information, the AGENCY will notify the CONSULTANT of the request and of the date that such records will be released to the requester unless the CONSULTANT obtains a court order from a court of competent jurisdiction enjoining that disclosure. If the CONSULTANT fails to obtain the court order enjoining disclosure, the AGENCY will release the requested information on the date specified. The CONSULTANT agrees to notify the sub-consultant of any AGENCY communication regarding disclosure that may include a sub-consultant’s proprietary and/or confidential information. The CONSULTANT notification to the sub-consultant will include the date that such records will be released by the AGENCY to the requester and state that unless the sub-consultant obtains a court order from a court of competent jurisdiction enjoining that disclosure the AGENCY will release the requested information. If the CONSULTANT and/or sub-consultant fail to obtain a court order or other judicial relief enjoining the AGENCY by the release date, the CONSULTANT shall waive and release and shall hold harmless and indemnify the AGENCY from all claims of actual or alleged damages, liabilities, or costs associated with the AGENCY’s said disclosure of sub-consultants’ information. XX. Records Maintenance During the progress of the Work and SERVICES provided hereunder and for a period of not less than six (6) years from the date of final payment to the CONSULTANT, the CONSULTANT shall keep, retain and maintain all “documents” pertaining to the SERVICES provided pursuant to this AGREEMENT. Copies of all “documents” pertaining to the SERVICES provided hereunder shall be made available for review at the CONSULTANT’s place of business during normal working hours. If any litigation, claim or audit is commenced, the CONSULTANT shall cooperate with AGENCY and assist in the production of all such documents. “Documents” shall be retained until all litigation, claims or audit findings have been resolved even though such litigation, claim or audit continues past the six (6) year retention period. For purposes of this AGREEMENT, “documents” means every writing or record of every type and description, including electronically stored information (“ESI”), that is in the possession, control, or custody of the CONSULTANT, including, without limitation, any and all correspondences, contracts, AGREEMENT ‘s, appraisals, plans, designs, data, surveys, maps, spreadsheets, memoranda, stenographic or handwritten notes, reports, records, telegrams, schedules, diaries, notebooks, logbooks, invoices, accounting records, work sheets, charts, notes, drafts, scribblings, recordings, visual displays, photographs, minutes of meetings, October 6, 2026 J - 17 PSA-2026-33 Agreement Number: Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 14 of 14 tabulations, computations, summaries, inventories, and writings regarding conferences, conversations or telephone conversations, and any and all other taped, recorded, written, printed or typed matters of any kind or description; every copy of the foregoing whether or not the original is in the possession, custody, or control of the CONSULTANT, and every copy of any of the foregoing, whether or not such copy is a copy identical to an original, or whether or not such copy contains any commentary or notation whatsoever that does not appear on the original. For purposes of this AGREEMENT, “ESI” means any and all computer data or electronic recorded media of any kind, including “Native Files”, that are stored in any medium from which it can be retrieved and examined, either directly or after translation into a reasonably useable form. ESI may include information and/or documentation stored in various software programs such as: Email, Outlook, Word, Excel, Access, Publisher, PowerPoint, Adobe Acrobat, SQL databases, or any other software or electronic communication programs or databases that the CONSULTANT may use in the performance of its operations. ESI may be located on network servers, backup tapes, smart phones, thumb drives, CDs, DVDs, floppy disks, work computers, cell phones, laptops or any other electronic device that CONSULTANT uses in the performance of its Work or SERVICES hereunder, including any personal devices used by the CONSULTANT or any sub-consultant at home. “Native files” are a subset of ESI and refer to the electronic format of the application in which such ESI is normally created, viewed, and /or modified. The CONSULTANT shall include this section XX “Records Maintenance” in every subcontract it enters into in relation to this AGREEMENT and bind the sub-consultant to its terms, unless expressly agreed to otherwise in writing by the AGENCY prior to the execution of such subcontract. In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the “Execution Date” box on page one (1) of this AGREEMENT. Signature Date Signature Date Any modification, change, or reformation of this AGREEMENT shall require approval as to form by the Office of the Attorney General. October 6, 2026 J - 18 PSA-2026-33 Agreement Number: Exhibit A - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 Exhibit A Scope of Work Project No. HSIP-000S(740) / TR0220 See attached Scope of Work October 6, 2026 J - 19 PSA-2026-33 Agreement Number: Exhibit B - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 Exhibit B DBE Participation N/A October 6, 2026 J - 20 PSA-2026-33 Agreement Number: Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 4 Exhibit C Preparation and Delivery of Electronic Engineering and Other Data In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is to use in preparing electronic files for transmission to the agency. The format and standards to be provided may include, but are not limited to, the following: I. Surveying, Roadway Design & Plans Preparation Section A. Survey Data See attached Scope of Work B. Roadway Design Files See attached Scope of Work C. Computer Aided Drafting Files See attached Scope of Work October 6, 2026 J - 21 PSA-2026-33 Agreement Number: Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 2 of 4 D. Specify the Agency’s Right to Review Product with the Consultant Provided for review upon request. E. Specify the Electronic Deliverables to Be Provided to the Agency See attached Scope of Work. F. Specify What Agency Furnished Services and Information Is to Be Provided See attached Scope of Work. October 6, 2026 J - 22 Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 3 of 4 II. Any Other Electronic Files to Be Provided None. III. Methods to Electronically Exchange Data Email or.... October 6, 2026 J - 23 Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 4 of 4 A. Agency Software Suite Microsoft Office 365 AutoCAD (Version Needed) AutoCAD Civil3D (Version Needed) B. Electronic Messaging System Microsoft Office 365 C. File Transfers Format As specified above. October 6, 2026 J - 24 PSA-2026-33 Agreement Number: Exhibit D - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 Exhibit D Prime Consultant Cost Computations See attached Cost Estimate Worksheet for Transpo Group, et al. October 6, 2026 J - 25 PSA-2026-33 Agreement Number: Exhibit E - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 Exhibit E Sub-consultant Cost Computations If no sub-consultant participation at this time. The CONSULTANT shall not sub-contract for the performance of any work under this AGREEMENT without prior written permission of the AGENCY. Refer to section VI “Sub-Contracting” of this AGREEMENT. See Attachment A October 6, 2026 J - 26 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Agreement Number Revised 02/01/2021 Exhibit F - Title VI Assurances Appendix A & E APPENDIX A During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows: 1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, (Title of Modal Operating Administration), as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. 2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21. [Include Modal Operating Administration specific program requirements.] 3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to Non-discrimination on the grounds of race, color, or national origin. [Include Modal Operating Administration specific program requirements.] 4. Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the (Title of Modal Operating Administration) to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the (Title of Modal Operating Administration), as appropriate, and will set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non- discrimination provisions of this contract, the Recipient will impose such contract sanctions as it or the (Title of Modal Operating Administration) may determine to be appropriate, including, but not limited to: a. withholding payments to the contractor under the contract until the contractor complies; and/or b. cancelling, terminating, or suspending a contract, in whole or in part. 6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the Recipient or the (Title of Modal Operating Administration) may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States. October 6, 2026 J - 27 Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement Agreement Number Revised 02/01/2021 Exhibit F - Title VI Assurances Appendix A & E APPENDIX E During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: Pertinent Non-Discrimination Authorities: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); • Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38; • The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). October 6, 2026 J - 28 Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 Exhibit G Certification Documents Exhibit G-1(a) Certification of Consultant Exhibit G-1(b) Certification of Exhibit G-2 Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions Exhibit G-3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying Exhibit G-4 Certificate of Current Cost or Pricing Data Agency October 6, 2026 J - 29 Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Exhibit G-1(a) Certification of Consultant I hereby certify that I am the and duly authorized representative of the firm of Transpo Group USA, Inc. whose address is 12131 113th Ave NE #203, Kirkland, WA 98034 and that neither the above firm nor I have: a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT) to solicit or secure this AGREEMENT; b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out this AGREEMENT; or c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any); I acknowledge that this certificate is to be furnished to the Washington State Department of Transportation and the Federal Highway Administration, U.S. Department of Transportation in connection with this AGREEMENT involving participation of Federal-aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. Transpo Group USA, Inc. Consultant (Firm Name) Signature (Authorized Official of Consultant) Date October 6, 2026 J - 30 Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Exhibit G-1(b) Certification of I hereby certify that I am the: City Manager Other of the City of Port Angeles Agency , and Transpo Group USA, Inc. or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this AGREEMENT to: a) Employ or retain, or agree to employ to retain, any firm or person; or b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution, donation, or consideration of any kind; except as hereby expressly stated (if any): I acknowledge that this certificate is to be furnished to the Washington State Department of Transportation and the Federal Highway Administration, U.S. Department of Transportation, in connection with this AGREEMENT involving participation of Federal-aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. Signature Date October 6, 2026 J - 31 Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Exhibit G-2 Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions I. The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: A. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; B. Have not within a three (3) year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State anti-trust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; C. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and D. Have not within a three (3) year period preceding this application / proposal had one or more public transactions (Federal, State and local) terminated for cause or default. II. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. Transpo Group USA, Inc. Consultant (Firm Name) Signature (Authorized Official of Consultant) Date October 6, 2026 J - 32 Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Exhibit G-3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: 1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative AGREEMENT, and the extension, continuation, renewal, amendment, or modification of Federal contract, grant, loan or cooperative AGREEMENT. 2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan or cooperative AGREEMENT, the undersigned shall complete and submit Standard Form - LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000.00, and not more than $100,000.00, for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier sub-contracts, which exceed $100,000, and that all such sub-recipients shall certify and disclose accordingly. Transpo Group USA, Inc. Consultant (Firm Name) Signature (Authorized Official of Consultant) Date October 6, 2026 J - 33 Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Exhibit G-4 Certificate of Current Cost or Pricing Data This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer’s representative in support of Traffic Circle Program * are accurate, complete, and current as of (Insert Date) **. This certification includes the cost or pricing data supporting any advance AGREEMENT’s and forward pricing rate AGREEMENT’s between the offer or and the Government that are part of the proposal. Firm: Transpo Group USA, Inc. Signature Title Date of Execution***: (Insert Date) *Identify the proposal, quotation, request for pricing adjustment, or other submission involved, giving the appropriate identifying number (e.g. project title.) **Insert the day, month, and year, when price negotiations were concluded and price AGREEMENT was reached. ***Insert the day, month, and year, of signing, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to. Agreement Number: PSA-2026-33 October 6, 2026 J - 34 PSA-2026-33 Agreement Number: Exhibit H - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 Exhibit H Liability Insurance Increase To Be Used Only If Insurance Requirements Are Increased The professional liability limit of the CONSULTANT to the AGENCY identified in Section XII, Legal Relations and Insurance of this Agreement is amended to $ N/A . The CONSULTANT shall provide Professional Liability insurance with minimum per occurrence limits in the amount of $ N/A . Such insurance coverage shall be evidenced by one of the following methods: • Certificate of Insurance. • Self-insurance through an irrevocable Letter of Credit from a qualified financial institution. Self-insurance through documentation of a separate fund established exclusively for the payment of professional liability claims, including claim amounts already reserved against the fund, safeguards established for payment from the fund, a copy of the latest annual financial statements, and disclosure of the investment portfolio for those funds. Should the minimum Professional Liability insurance limit required by the AGENCY as specified above exceed $1 million per occurrence or the value of the contract, whichever is greater, then justification shall be submitted to the Federal Highway Administration (FHWA) for approval to increase the minimum insurance limit. If FHWA approval is obtained, the AGENCY may, at its own cost, reimburse the CONSULTANT for the additional professional liability insurance required. Notes: Cost of added insurance requirements: $ N/A . • Include all costs, fee increase, premiums. • This cost shall not be billed against an FHWA funded project. • For final contracts, include this exhibit. N/A October 6, 2026 J - 35 PSA-2026-33 Agreement Number: Exhibit I - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 2 Exhibit I Alleged Consultant Design Error Procedures The purpose of this exhibit is to establish a procedure to determine if a consultant’s alleged design error is of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage due to the alleged error by the consultant. Step 1 Potential Consultant Design Error(s) is Identified by Agency’s Project Manager At the first indication of potential consultant design error(s), the first step in the process is for the Agency’s project manager to notify the Director of Public Works or Agency Engineer regarding the potential design error(s). For federally funded projects, the Region Local Programs Engineer should be informed and involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an agency staff person other than the project manager, who has not been as directly involved in the project, to be responsible for the remaining steps in these procedures.) Step 2 Project Manager Documents the Alleged Consultant Design Error(s) After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the Director of Public Works or Agency Engineer’s concurrence, the project manager obtains more detailed documentation than is normally required on the project. Examples include: all decisions and descriptions of work; photographs, records of labor, materials and equipment. Step 3 Contact the Consultant Regarding the Alleged Design Error(s) If it is determined that there is a need to proceed further, the next step in the process is for the project manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged error(s). The project manager and other appropriate agency staff should represent the agency and the consultant should be represented by their project manager and any personnel (including sub-consultants) deemed appropriate for the alleged design error(s) issue. Step 4 Attempt to Resolve Alleged Design Error with Consultant After the meeting(s) with the consultant have been completed regarding the consultant’s alleged design error(s), there are three possible scenarios: • It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, then the process will not proceed beyond this point. • It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case, then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement with the consultant. The settlement would be paid to the agency or the amount would be reduced from the consultant’s agreement with the agency for the services on the project in which the design error took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary of the settlement for review and to make adjustments, if any, as to how the settlement affects federal reimbursements. No further action is required. • There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5. October 6, 2026 J - 36 PSA-2026-33 Agreement Number: Exhibit I - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 2 of 2 Step 5 Forward Documents to Local Programs For federally funded projects all available information, including costs, should be forwarded through the Region Local Programs Engineer to LP for their review and consultation with the FHWA. LP will meet with representatives of the agency and the consultant to review the alleged design error(s), and attempt to find a resolution to the issue. If necessary, LP will request assistance from the Attorney General’s Office for legal interpretation. LP will also identify how the alleged error(s) affects eligibility of project costs for federal reimbursement. • If mutual agreement is reached, the agency and consultant adjust the scope of work and costs to reflect the agreed upon resolution. LP, in consultation with FHWA, will identify the amount of federal participation in the agreed upon resolution of the issue. • If mutual agreement is not reached, the agency and consultant may seek settlement by arbitration or by litigation. October 6, 2026 J - 37 PSA-2026-33 Agreement Number: Exhibit J - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 2 Exhibit J Consultant Claim Procedures The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following procedures should only be utilized on consultant claims greater than $1,000. If the consultant’s claim(s) are a total of $1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant’s claim(s) that total $1,000 or less. This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential claim by the consultant. Step 1 Consultant Files a Claim with the Agency Project Manager If the consultant determines that they were requested to perform additional services that were outside of the agreement’s scope of work, they may be entitled to a claim. The first step that must be completed is the request for consideration of the claim to the Agency’s project manager. The consultant’s claim must outline the following: • Summation of hours by classification for each firm that is included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Timeframe of the additional work that was outside of the project scope; • Summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; and • Explanation as to why the consultant believes the additional work was outside of the agreement scope of work. Step 2 Review by Agency Personnel Regarding the Consultant’s Claim for Additional Compensation After the consultant has completed step 1, the next step in the process is to forward the request to the Agency’s project manager. The project manager will review the consultant’s claim and will met with the Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the FHWA is participating in the project’s funding, forward a copy of the consultant’s claim and the Agency’s recommendation for federal participation in the claim to the WSDOT Local Programs through the Region Local Programs Engineer. If the claim is not eligible for federal participation, payment will need to be from agency funds. If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Local Programs (if applicable), and FHWA (if applicable) agree with the consultant’s claim, send a request memo, including backup documentation to the consultant to either supplement the agreement, or create a new agreement for the claim. After the request has been approved, the Agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. No further action in needed regarding the claim procedures. If the Agency does not agree with the consultant’s claim, proceed to step 3 of the procedures. October 6, 2026 J - 38 PSA-2026-33 Agreement Number: Exhibit J - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 2 of 2 Step 3 Preparation of Support Documentation Regarding Consultant’s Claim(s) If the Agency does not agree with the consultant’s claim, the project manager shall prepare a summary for the Director of Public Works or Agency Engineer that included the following: • Copy of information supplied by the consultant regarding the claim; • Agency’s summation of hours by classification for each firm that should be included in the claim; • Any correspondence that directed the consultant to perform the additional work; • Agency’s summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; • Explanation regarding those areas in which the Agency does/does not agree with the consultant’s claim(s); • Explanation to describe what has been instituted to preclude future consultant claim(s); and • Recommendations to resolve the claim. Step 4 Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency Documentation The Director of Public Works or Agency Engineer shall review and administratively approve or disapprove the claim, or portions thereof, which may include getting Agency Council or Commission approval (as appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain concurrence from WSDOT Local Programs and FHWA regarding final settlement of the claim. If the claim is not eligible for federal participation, payment will need to be from agency funds. Step 5 Informing Consultant of Decision Regarding the Claim The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final decision regarding the consultant’s claim(s). Include the final dollar amount of the accepted claim(s) and rationale utilized for the decision. Step 6 Preparation of Supplement or New Agreement for the Consultant’s Claim(s) The agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. October 6, 2026 J - 39 Page 1 EXHIBIT A Scope of Work Client Name: City of Port Angeles Project Name: Traffic Circle Program (TR 0220) Exhibit Dated: September 24, 2026 TG: 1.26064.00 Scope of Services Transpo Group USA, Inc. (Consultant), will provide engineering services to the City of Port Angeles (City) for the design of circular intersection control improvements, visibility treatments at existing stop controlled intersections, and crossing improvements in the City of Port Angeles, Washington. Improvements in the scope meet the scope of the City’s programmed TR 0220 project and funded by a WSDOT Highway Safety Improvement Program (HSIP), consisting of federal funds. The Consultant will lead the project and work in coordination with subconsultants, Wilson Engineering, to provide a consistent overall project design across engineering disciplines. Subconsultant efforts will include stormwater management improvement support and site survey. The Consultant work program is organized into the following tasks: Task 1. Project Management Task 2. Design Support Services Task 3. Preliminary (30%) Design & Intersection Control Alternatives Task 4. Final Design, Specifications, and Estimates (PS&E) Task 5. Bid and Award Support Project Definition The Consultant has developed the scope with the assumption that the specific project elements identified in the RFQ and the WSDOT HSIP application, as issued in July, 2026, are the basis of design, but with the understanding that the City wishes to engage in an alternatives process and the scope of the project may be altered. The following describes the key project components, divided by improvement type. Circular Intersection Control Locations: Laurel Street and 9th, 7th and 6th Streets, Oak and 6th and 3rd Streets, Chase and 6th Street, Vine and 6th Street, Francis and 2nd Street, Washington and 2nd Street. The project site is generally considered the footprint of the subject intersection and approximately 100’ along each associated leg of the intersection. Elements: Consider for Design and install;  Circular intersection control – either neighborhood traffic circles or mini-roundabouts, as determined by an engineering analysis and study of each intersection  Curb ramp replacement where (1) existing ramps are out of compliance with current ADA standards and (2) receiving facilities are present in the existing condition  Associated stormwater modifications, as required by ramps, wheel paths, etc. Stop Controlled Intersection Improvements Locations: Laurel Street and 8th and 3rd Streets. The project site is generally considered the footprint of the subject intersection and approximately 100’ along Laurel Street. Elements: Consider for Design and install; October 6, 2026 J - 40 Page 2  Stop sign visibility treatments  Low Cost/High Impact style channelization and surface mount feature improvements to improve safety, visibility and compliance with existing stop control Crossing Improvements Locations: Laurel Street and 5th Street. The project site is generally considered the footprint of the subject intersection and approximately 100’ along Laurel Street. Elements: Design and install;  Channelization, beacon (if warranted) and visibility treatments for crossing of 5th Street  Low Cost/High Impact style channelization and surface mount feature improvements to improve safety, visibility and compliance with existing stop control Task 1 — Project Management 1.1 Project Coordination The Consultant team project manager will coordinate video chats with the City’s project manager on a regular basis (weekly or bi-weekly) throughout the duration of the project. The coordination will address project scope/status, technical and policy direction, budget, schedule, and meetings. Coordination will be via video chat, telephone calls, and email, as appropriate. Design meetings may be expanded as the project progresses for significant milestones including alternatives evaluations or reviewing comments following design submittals. Agendas will be prepared for meetings, but minutes will not be distributed. The Consultant will prepare and maintain an internal Project Management Plan (PMP). The PMP will include a copy of the project scope, schedule and budget. The PMP will also include a risk matrix, quality control plan, and communications plan (internal and external). The PMP will be updated regularly throughout the course of the project. Up to two (2) in-person meetings are included in the scope, including the meeting described in Section 2.2. Additional in-person meetings may be feasible based on project resources, and will be discussed between the City and Consultant project manager. The Consultant team project manager will also coordinate with subconsultants on a regular basis regarding project scope/status, project direction, budget, and schedule. 1.2 Progress Reports and Invoicing Detailed progress reports and invoices will be prepared on a monthly basis and provided to the City. 1.3 Project Schedule The Consultant will provide a project schedule to the City and maintain the schedule with monthly updates on progress and affected milestones. The schedule will show milestone dates and events necessary to complete the plans, estimates, and special provisions to complete the design of all the project improvements. The anticipated schedule for this project is 17 months, with a Notice to Proceed in September 2026 with anticipated completion of the 100 percent design and bid package submittal by the end of September 2027 and support of obligation and bidding to extend into early 2028. October 6, 2026 J - 41 Page 3 Task 2 — Design Support Services 2.1 NEPA Permitting Permitting for the project is anticipated to be a NEPA Categorical Exclusion. The Consultant will prepare the draft Categorical Exclusion form, assist the City in coordinating a kickoff, interim submittal and final submittal with WSDOT Local Programs/Environmental Services to obtain the NEPA permit for the project, and prepare the forms, exhibits and other associated documents that fall within the Consultants’ area of expertise. If specialty services are required following kickoff review and consultation with WSDOT Local Programs, the Consultant may need to subcontract services including biological assessment and cultural and/or archeological assessment. At the time of scoping, these specialty services are not anticipated. 2.2 Survey The Consultant will work with Wilson Engineering to address needed topographic survey. The survey will be completed at intersections that are evaluated to have a need for more detailed design in order to meet required ADA slopes at curb ramps. Survey may not be acquired at all intersections. The Consultant team and the City will meet in the field to confirm the scope of necessary survey early in the project design process. The scope of survey services is to be completed per Attachment A from Wilson Engineering. 2.3 Public Outreach The City will lead the public outreach, but the Consultant will provide support with exhibits, including colorized, simplified public facing versions, and excerpts from reports prepared for the alternatives analysis and preliminary design. Additional materials may be provided for City-provided project websites or for Council reports. The scope includes attendance by the Consultant at one public open houses, if desired by the City. The timing of the Consultant’s attendance at the open house will be discussed with the City during the project design. Additional public outreach will include coordination with stakeholders in the City operating large vehicles or emergency response who may be affected by the proposed changes at the intersections with circular control identified in the project description. The Consultant will work with the City to coordinate the appropriate routing of contacts to set up individual meetings, participation in weekly check-ins, or separate task force meetings as appropriate. The Consultant anticipates stakeholder outreach to occur prior to the finalizing of conceptual design, informing the alternatives selection, and prior to the 90% submittal, for input from stakeholders on the detailed designs. Stakeholders are anticipated to include:  Port Angeles fire and police departments  Clallam Transit  Port Angeles School District  Safeway, located at 110 E 3rd Street Up to two additional stakeholders not listed may be included in the coordination efforts. More than two additional stakeholders or additional public outreach meetings may require a modification of the Consultant’s fee or schedule. The Consultant will notify the City as early as possible if outreach efforts are anticipated to exceed the anticipated scope of work. October 6, 2026 J - 42 Page 4 2.4 Stormwater Design Wilson Engineering will provide stormwater design for the project, consisting of adjustments/relocations of existing stormwater inlets and catch basins. The scope of the modifications in the project is not anticipated to trigger a need for new stormwater systems. It is assumed that the conceptual design for intersection control and ramps will avoid stormwater impacts to the extent feasible at most intersections in the scope. A scope of stormwater services to be completed is included in Attachment A from Wilson Engineering. It is assumed that the City will provide existing/as-built catch basin, stormwater conduit and drainage basin information from existing files and/or the City’s Overall Stormwater Plan. Task 3 — Preliminary (30%) Design & Alternatives For the preliminary (30%) design, the Consultant will use the existing concept developed for the City’s Local Road Safety Plan and described in the HSIP application provided with the RFQ in July, 2026 to guide the range of considered alternatives and the location of circular intersection control. The City and the Consultant will discuss any changes the City desires and any alternatives that need to be addressed. Alternatives will be developed using guidance applicable to federally funded projects, including:  AASHTO 2018, “A Policy on Geometric Design of Highways and Streets”  MUTCD  FHWA Safety and Roundabout guidance  WSDOT Design Manual  City of Port Angeles Urban Services Standards & Guidelines (USSG) The WSDOT Active Transportation Program Design Guide is not a federally mandated design standard, but will be used to help guide the selection of alternatives, where feasible and aligned with other guidance and standards applicable to federally funded projects. The evaluation of alternatives will identify conditions at the subject intersections for circular intersection control and select between a neighborhood traffic circle design and a mini roundabout design. The differences between the two treatments are assumed to be as described in Attachment B to the scope of work. Modifications to the criteria to select between the two intersection treatment types, or the introduction of other intersection treatment options to the evaluation by the City may represent a modification of the scope and the Consultant may request a modification of the fee or schedule. The Consultant will prepare a report for each intersection documenting the identified existing conditions, both physical and operational, and the justification for selecting the recommended treatment. The City will confirm the Consultant’s evaluation and intersection control type. The Consultant will prepare a final report of the alternatives evaluation process for the City’s records and to demonstrate the process to the public. Following confirmation of the intersection control type, the Consultant will prepare conceptual design exhibits depicting paving modifications, channelization, signing, cross-sections, and stormwater modifications at each circular control intersection. The Consultant will prepare conceptual design exhibits depicting recommended channelization, signing and surface-mounted treatments at the stop controlled intersections and crossing improvement intersection for review, comment and confirmation by the City. At the 30% design level, submittals will consist of exhibits, simplified design drawings on non-construction borders, that are intended to convey the concepts of civil and traffic elements of the project, but do not contain detailed dimensioning, may not be completely aligned to survey, and are not intended to convey all design elements of the final plans. Exhibits are intended to provide the Consultant with an opportunity to assess critical feasibility elements of a design, and convey an understanding of the City’s intended and expected design. The exhibits will provide the City with an opportunity to provide input on global changes October 6, 2026 J - 43 Page 5 to civil geometry and/or traffic elements of the project before detailed design work is completed, in an effort to increase efficiency of design resources. For the TR 0220 project, specific emphasis will be placed on curb ramps at the 30% design stage and the relationship of civil work to existing right of way (ROW), assumed to be accurate based on available GIS data at the 30% design stage. If more detailed ROW information is required based on the 30% design, additional detail will be provided per Task 2.2 at a later design stage. The Consultant will maintain cost estimates at the highest level of accuracy as feasible given the preliminary nature of design. Cost estimates prepared in Task 3 will include contingencies and other factors to account for unknowns or potential changes in later stages of design. The cost estimates prepared in Task 3 are intended to be for tracking alternatives against the overall project budget and comparing alternatives and are not intended to be representative of the final bid estimate level of detail or accuracy. Consultant Deliverables  Evaluation and documentation of alternatives for circular intersection control at the intersections described in the Project Description  Conceptual cost estimates for all project modifications  Preliminary design level intersection plans for the preferred alternatives, topics including: o Roadway paving exhibits (Transpo)  Paving will include curb ramp extents, compared to known ROW o Channelization exhibits (Transpo) o Typical roadway sections (Transpo) o Stormwater system plan view exhibits (Wilson)  Intersection control type alternatives evaluation summary report Task 4 — Final (90% & 100%) Design Plans, Specifications, and Estimates (PS&E) The Consultant will prepare design plans, specifications, and estimates for 90%, and 100% (final) levels of design of the preferred alternative. Plan sheets will be developed at a 1”=20’ full-size scale that allows for approximately 500 feet per plan “window”. Two plan windows will be used on sheets where feasible to reduce the total number of sheets and proposed work can be clearly and concisely conveyed to contractors. Topics may be combined on sheets, as listed or per City approval to reduce the total number of sheets in the final package. Any deviations from this scope or approved City standard practices shall require written prior approval from the City. Design of curb ramps is resource-intensive, involving all disciplines including survey, and therefore, the scope of anticipated ramps are included below. A total of 50 ramps is assumed for the development of the scope but the final number may vary. Ramps will be designed to be directional where feasible based on site context. An increase of 5% or more in the number of ramps may affect the scope, schedule and fee. Ramps are anticipated at:  8 ramps at Laurel and 9th  8 ramps at Laurel and 7th  6 ramps at Laurel and 6th (SE ramps are recently replaced)  2 ramps at Laurel and 5th (only ramps associated with the improved crossing)  8 ramps at Oak and 6th  8 ramps at Oak and 3rd  6 ramps at Chase and 6th (NE ramps appear to meet standards)  4 ramps at Vine and 6th (east/west only with no receiving facilities north of 6th on Vine)  0 ramps at Francis and 2nd (all ramps are recently replaced) October 6, 2026 J - 44 Page 6  0 ramps at Washington and 2nd (2 ramps are recently replaced, no receiving facilities on other 3 corners)  No ramp modifications are expected to be required for the stop sign enhancement modifications For efficiency of design resources, flowline profiles will only be provided at curb ramps where grading is necessary to provide positive drainage. Roadway cross slopes will be matched at ramps for mini- roundabout and uncontrolled intersections, per ADA requirements, as required for federally funded projects.(PROWAG R302.5.2.4, R304.2.2). Stormwater facilities impacting ramps may be a documented reason to avoid reconstructing a ramp (PROWAG R202.3). The Consultant will provide MEF documentation, as required, for curb ramps. Standard details from WSDOT and the City of Port Angeles will be used to guide detailed ramp design to the extent feasible. As a federally funded project, the Consultant anticipates the need to prepare site-specific traffic control plans for all project work locations, including temporary routing for pedestrian access routes. The Consultant will utilize City, WSDOT and MUTCD standard plans, modified and updated to be specific to each project site, to the extent feasible given site conditions. The Consultant will submit the design plans for review by the City. The City’s review will assist in identifying issues, resolve problems, recommend modifications, suggest actions required and provide direction and guidance for the next stage of design. The City will be responsive to communication from the Consultant during the design plan preparation process to assist in avoiding substantial revision during the review process. This effort shall not alter the Consultant’s responsibility for the work and is intended to be a collaboration to evaluate potential conflicts in the design. The Consultant will prepare the special provisions and applicable amendments to the contract provisions, Divisions one through nine, as required for the improvements. The Consultant will compile the final specifications for bid, with support from the City in the form of recently bid projects, and any boilerplate materials for bid documents or Division 1. The contract provisions shall be prepared in accordance with the requirements of WSDOT and the City of Port Angeles. The Consultant shall prepare special provisions for those items not covered by WSDOT’s most current publication of the Standard Specifications for Road, Bridge and Municipal Construction including the most current published WSDOT GSPs and APWA GSPs. The Consultant will prepare quantity estimates and backup calculations in accordance with the WSDOT bid item descriptions. Final quantity estimates will be prepared according to WSDOT format and backup calculations for lump sum and unit price items will be provided. Quantity estimates will be used to prepare the summary of quantity sheets, and all other material required for construction. Quantities will be combined into a single bid package. The Consultant will maintain a construction cost estimate throughout the project consistent with City estimate files, updated at each design milestone. The estimate will be developed in Excel format. The Consultant and the City will collaborate to develop the final bid documents book, including required forms, legal agreements, bid schedule, etc. The Consultant will rely on the City to provide any City- approved legal documents, preferred templates and formatting, etc. to develop the final bid documents. All electronic materials used to generate the Bid Set Plans, Specifications and Estimate will be submitted to the City. Drawings will be submitted in PDF and AutoCAD/AutoCAD Civil 3D format. Specifications will be submitted in editable Microsoft Word format. The Estimate will be submitted in editable Microsoft Excel format. File names for submitted plans and specification files shall follow the convention: Date-Project#-plans-percent-status October 6, 2026 J - 45 Page 7 4.1 90% Submittal The 90% submittal will include drawings, special provisions listing, and the Engineer’s estimate. The City will review the submittal and return a consolidated set of comments to the Consultant. The review period will last a minimum of two weeks. The 90% plans will include the following topics:  Cover Sheet with Vicinity Map and Index (Transpo)  Legend and Abbreviations (Transpo)  Site Preparation Plans, including TESC and Details (Transpo)  Roadway and Sidewalk Paving Plans (Transpo)  Curb ramp Details (Transpo)  Flowline profiles for all new curb and gutter (Transpo)  Roadway Details (Transpo)  Stormwater Plans, Profiles and Details (Wilson)  Striping and Signing Plans (Transpo)  Traffic Control Plans and Details (Transpo) The standard and custom design details will utilize City of Port Angeles and WSDOT standards. During the development of the 90% submittal, the Consultant anticipates completion of the final NEPA categorical exclusion, implementing the feedback gathered from WSDOT from earlier preliminary submittals, and identifying final information for project elements including traffic control, affected pollution generating impermeable surface, etc. The Consultant will submit the final permitting documents to WSDOT and respond to any feedback in this phase. The Consultant will offer WSDOT the opportunity to conduct a preliminary review of the 90% plans and specifications, with the goal of limiting the review time and comments on the formal WSDOT review of the final set prior to obligation. Consultant Deliverables  One electronic PDF copy of 90% Plans.  90% Cost estimate in Excel format.  90% Special provisions in Word format.  Draft Drainage Report, if required, in PDF format 4.2 100% (Final) Submittal The 100% package will include completed drawings, special provisions, and the final Engineer’s estimate. The 90% PS&E Plan submittal comments will be incorporated into the submittal. The Consultant will make no further changes to the documents without the approval of the City. The Consultant will maintain communication with WSDOT regarding their timing for review of the final plans and specifications to ensure the City’s timeline and federal funding obligation timelines are being met. The Consultant will prepare the obligation package, including required forms as identified in the WSDOT LAG Manual and the most recent updates for submittal to WSDOT. The Consultant anticipates one round of comments from WSDOT and submittal of an updated obligation package. Additional rounds of comments from WSDOT may require a modification of the fee or schedule, and the Consultant will notify the City as soon as possible of any cost or schedule impacts of additional WSDOT review. Consultant Deliverables  Comment response letter/matrix from 90% submittal.  One electronic PDF copy of Final Plans. Each sheet shall be stamped and signed by the engineer of record (EOR) from the Consultant. October 6, 2026 J - 46 Page 8  100% Cost estimate in Excel format.  100% Special provisions in Word format.  Final Drainage Report, if required, in PDF format  Final electronic CAD files. Task 5 – Bid and Award Support The Consultant will provide assistance during the bid and award of the construction contract. The following tasks will be provided on an as-needed basis. Written authorization from the City will be obtained prior to providing any of the following services:  The Consultant will attend a pre-construction meeting with the construction contractor to assist the City in responding to questions and inquires.  If requested, the Consultant will assist the City during the bid period to answer any questions that arise concerning the PS&E documents, and will assist the City in preparing any addenda required. Consultant Deliverables:  Prepare response to bidder questions and bid document addenda. Task 6 –Construction Services Construction services will be negotiated at a later date. The Consultant may need to add additional subconsultants to support the City’s needs for construction phase services for a federally funded project. The fee for construction services is not included in the scope at this time. Consultant Deliverables:  None Assumptions The Consultant has developed this scope with the assumption that the project elements identified in the RFQ and in subsequent discussions with the City project PM are applicable. Modifications to these project elements, including the addition or removal of project elements such as new curbing, increased signage, relocation of improvements or additional pavement markings, or changes in roadway surface preferences may require a negotiated fee and schedule modification between the Consultant and the City. The Consultant will notify the City as soon as possible of the anticipated impact of changes to project elements on fee and schedule. This Scope of Services assumes the following:  Computer Aided Drafting (CAD) will be performed using AutoCAD version 2024 or later  All other deliverables besides the CAD files will be provided electronically via PDF and in their original file format.  City of Port Angeles Urban Services Standards & Guidelines (USSG) will be used as a starting point for preparing design concepts. Additional standards may be incorporated from WSDOT or developed custom for the project.  Right of way acquisition, including temporary construction easements, is not anticipated and will be avoided by the Consultant throughout the design phase. No right of way or easements are anticipated as of the writing of this scope. October 6, 2026 J - 47 Page 9  No relocation of franchise utilities is assumed as part of the design. Identified franchise utilities will be designed by the owners, and the City will conduct the coordination with support from the Consultant in the form of files and sheets already in development for other design milestones.  All projects are anticipated to meet the requirements for a NEPA categorical exclusion and no design of or Consultant support for mitigation is included in this scope.  No signal additions or modifications are anticipated in the scope.  No illumination or modifications to existing illumination are included or anticipated in the scope.  No driveway modifications are included or anticipated in the scope.  No retaining walls are included or anticipated in the scope.  Turning movements at circular intersection control will only be checked if a transit or school bus route exists through the intersection. Other turning movements will be considered to be acceptable based on design standards for circles/roundabouts, and center islands are intended to be traversed by larger vehicles.  No geotechnical support services are required at this time. If geotechnical investigations and analysis are required, a supplement to the scope and fee will be required, and a separate subconsultant with expertise in geotechnical investigation will be added to the Consultant team.  No major changes, requiring engineering re-design, will be required to the plans, estimate or special provisions after the 100% submittal. Final modifications will be editorial in nature. October 6, 2026 J - 48 12131 113th Avenue NE, Suite 203, Kirkland, WA 98034 | 425.821.3665 | MEMORANDUM Date: September 24, 2026 TG:26064.00 To: Project File From: Brett Schock, PE, AICP, RSP2i, Project Manager cc: Subject: Traffic Circle vs. Mini-Roundabout evaluation For the purposes of the City’s project TR 0220, installing circular intersection control at several locations throughout the City, there are two main options for such a circular control; neighborhood traffic circles or mini roundabouts. The following documents Transpo’s understanding of the difference between the two treatments and outlines the selection process between the two, although the selection at a particular intersection will be highly context sensitive and may deviate from what is listed below with documented existing conditions and operations. The following represents considerations that were developed for the response to the City’s RFQ and may be refined during the design process of the TR 0220 project. Comparing Intersection Treatments Both a mini roundabout and a neighborhood traffic circle provide circular intersection control, avoiding the need for signed stop control, use of yield control, or higher cost treatments like a signal without leaving the intersection with no set type of control for conflicting crossing and turning movements. Mini Roundabout Neighborhood Traffic Circle Provides circular control Yes, with control and safety benefits Yes, with control and safety benefits Central island  Fully traversable  Larger, comparatively  Can be sawcut & cast in place or surface mounted  Fully traversable  Smaller, comparatively  Typically surface mounted Splitter islands  Raised with chicaning designed to limit entry and exit speeds  Sawcut & cast in place may be recommended for durability Painted with supplemental raised markers (optional) Potential impacts to Existing stormwater Possible impact if size of central island places drive lanes over existing structures Less likely to impact as circle and drive paths can be adjusted to avoid structures Existing pedestrian access routes (PARs)  Possible impact depending on splitter islands.  Splitter island design can be affected by a need to provide crossings Likely no impact with no raised features affecting crossings On-street parking Needs to be removed near intersection to accommodate splitter islands in most contexts Can remain closer to the intersection (within RCW limits) in many contexts October 6, 2026 J - 49 2 Transit (school or public) vehicles  Splitter island geometry may need to be shifted or raised islands removed depending on bus movements.  Busses likely have some “raised wheel” crossing of the center island for turns  Busses may have some “raised wheel” crossing of the center island for turns. Emergency response vehicles  Will slow all traffic through the intersection  Fire trucks may have some “raised wheel” crossings of the center island for turns  Will slow all traffic through the intersection  Fire trucks may have some “raised wheel” crossings of the center island for turns Design considerations for Topography Raised features may impact snow removal on steeper slopes Less raised features with maintenance concerns on steeper slopes Traffic volume Better for higher volume intersections (actual vpd will vary based on local context) Better for lower volume intersections (actual vpd will vary based on local context) Posted speeds Typically used for 30+ mph posted speeds Typically used for 25 and under posted speeds Operating speeds Can have a more pronounced traffic calming impact if operating speeds are higher than desired Some traffic calming impact, especially if used in sequence on adjacent intersections Design Features The design features of both types of intersection control will follow recommendations and standards from AASHTO, MUTCD/FHWA, WSDOT (including the Active Mode Design Guide) and the City of Port Angeles. October 6, 2026 J - 50 Transpo Group USA, Inc. Cost Estimate Worksheet Number / Project Name 26064 Port Angeles Traffic Circle Program Rate schedule is effective from June 27, 2026 through June 25, 2027 Only key staff are shown and other staff may work on and charge to the project as needed by the project manager. Project Manager Quality Control Lead Engineer Project Analyst Support Engineer Project Admin Project Admin Overhead Rate 162.87% initials BAS RP KBC JK TYK CM AMC Fee (as % of Labor)15% labor category Eng L7 Prin L7 Eng L5 Anyl L3 Eng L3 PA L3 PA L5 cost rate $103.37 $111.54 $81.73 $53.85 $50.00 $49.52 $72.12 Overhead $168.35 $181.66 $133.11 $87.70 $81.44 $80.65 $117.45 Fee (as a % of Labor)$40.76 $43.98 $32.23 $21.23 $19.72 $19.53 $28.44 Fully Burdened Rate $312.48 $337.18 $247.08 $162.78 $151.16 $149.70 $218.01 Labor: Work Task Hours Cost 1 Task 01 - Project Management 2 1.1 Project Coordination 16 2 4 4 26 $7,534 3 1.2 Progress Reports and Invoices 12 8 20 $5,494 5 0 $0 6 Task 02 - Design Support Services $0 7 2.1 NEPA Permitting 12 2 4 8 40 66 $12,610 8 2.2 Survey 2 1 2 4 9 $2,107 9 2.3 Public Outreach 16 16 32 $7,395 10 2.4 Stormwater Design 2 1 2 4 9 $2,107 11 0 $0 12 Task 03 - Channelization Concept Refinement $0 13 Evaluate intersection control alternatives 24 2 40 16 82 $20,662 14 Conceptual plans and estimates 12 2 16 40 70 $14,889 15 Design report 16 2 8 8 16 50 $11,348 16 0 $0 17 Task 04 - Final Design Plans, Specifications and Estimate $0 18 90% Engineering Design 20 2 80 120 40 262 $52,270 19 100% Engineering Design 12 2 60 80 16 170 $34,690 20 WSDOT Design Documentation & Obligation 16 2 12 16 46 $11,034 Bid Documents 8 12 16 36 $7,860 21 0 $0 22 Task 05 - Bid and Award Support $0 23 RFI & Bid Support 4 4 8 16 $3,540 32 0 $0 33 Task 06 - Construction Services $0 34 TBD $0 35 $0 40 0 $0 Total Hours 172 18 244 280 64 104 12 894 Labor Costs $53,747 $6,069 $60,288 $45,578 $9,674 $15,569 $2,616 $193,540.88 Miscellaneous Expenses:Reimbursable Subconsultants:Subs Item Cost Cost 1 Federal Express / Courier $0 1 Wilson Engineering (Survey, Stormwater)$89,673 2 Phone $0 2 3 Fax $0 3 4 Postage $0 4 5 Graphic supplies $0 5 6 Photography $0 7 Travel expenses (mileage)$1,000 $89,673 8 Reproduction $0 9 Traffic counts $0 10 Traffic accident data $0 11 Spec. MPS model run $0 12 Transportation Concurrency Application $0 Total Reimbursable Expenses $1,000 TOTAL ESTIMATE $284,213.88 Firm Total Subconsultants Cost Estimate Prepared on: 9/24/2026 October 6, 2026 J - 51 Date: October 6, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Vehicle Purchase – Light Operations Digger Derrick Vehicle #2552 Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This project directly aligns with the Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: The purchase of this Digger Derrick is necessary to support continued maintenance operations for the Light Operations utility. With this equipment the department will be able to support two crews while having some redundancies in place that would also allow for the servicing of equipment when necessary. Response times to outages and storm events will also be improved as staff will have the ability to respond to multiple locations quickly. The new unit will feature remote controls which will allow for better sightlines and safer operation for staff. The new Digger Derrick will be a 2027 Freightliner and feature a flatbed deck with an Altec Digger Derrick boom, as well as a Cummins engine that will utilize R99 Renewable Diesel while getting an estimated eight miles per gallon. Greener fleet options for this type of equipment are currently not available, and the purchase of this unit at this time is in the best interest of the City. Summary: Staff is seeking City Council approval to purchase a new 2027 Freightliner Digger Derrick for the Light Operations Division in the amount of $337,998.78, including taxes and accessories. Through the City’s membership in the Sourcewell Purchasing Cooperative, participating vendor Altec Industries of Saint Joseph, MO, was selected from the cooperative vendors list, Contract No. 091125- ALT. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Funding: Funding in the amount of $337,998.78, including taxes and accessories, is identified in the 2026 Equipment Services Replacement fund budget (501-7630-594-6410). Recommendation: 1) Approve the purchase of a new 2027 Freightliner Digger Derrick for the Light Operations Division from Altec Industries of Saint Joseph, MO, in an amount not-to-exceed $337,998.78, including taxes and accessories; and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary. October 6, 2026 J - 52 Funding Overview: This vehicle replacement is identified in the 2026 budget and through the approved 2027 – 2032 Capital Facilities Plan, including applicable taxes and accessories. Funding in the amount of $337,998.78, including taxes and accessories, is available in the Equipment Services Replacement Fund (501-7630-594-6410). Pricing from the Sourcewell Purchasing Cooperative contract is summarized below: Attachment(s): None Photo provided for reference. New Vehicle Type Vehicle Budget Sourcewell Bid Accessories Replacing Vehicle 2027 Freightliner Digger Derrick $350,000.00 $305,784.00 $5,000.00 N/A – New Addition to the City Fleet Tax $27,214.78 Total Cost $337,998.78 October 6, 2026 J - 53 Date: October 6, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: September 25, 2026, Wastewater Treatment Plant Discharge Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This project directly aligns with the Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity and #1 – Community Resilience. Background / Analysis: Outfall 002 was purchased from Rayonier during the Combined Sewer Overflow (CSO) Reduction Facilities project. It is utilized as the main outfall for Wastewater Treatment Plant (WWTP) effluent and the outfall that conveys CSOs when facilities reach full capacity. It is 7,990 feet long and discharges approximately one mile offshore, east of Port Angeles Harbor, in 60 feet of water. Its location is indicated on the attached site map. Primary treated wastewater is screened to remove larger debris that could plug pumps and equipment. It then flows into primary clarifiers where settled and floatable solids are removed. Primary treatment removes approximately 90% of settled solids and 60% of suspended solids. Failed components will be replaced and pumping control programs evaluated for optimization under similar circumstances. This includes, but is not limited to, replacement of a failed level sensor and evaluation of redundant sensor programming within our SCADA system. Summary: On the morning of September 25, 2026, the Wastewater Treatment Plant recorded two separate non-compliant wastewater discharges cause by equipment failures during high-flow conditions from a rainstorm. One discharge was estimated at 3,655 gallons of raw sewage discharged through Outfall 002. The other resulted in an estimated 4,200 gallons of wastewater that had undergone primary treatment and discharged to the same outfall. While these events are related to process operations intended to manage wet weather flows, they are not considered Combined Sewer Overflows (CSOs) because the combined sewer conveyance, treatment and storage were not at full capacity when these events occurred. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity and #1 – Community Resilience. Funding: N/A Recommendation: For Information Only October 6, 2026 L - 1 Timeline of Events 8:25am The WWTP was receiving high flow due to a rainstorm. The Plant Lead Operator was monitoring the influent diversion to CSO storage process and noticed the Influent Diversion Structure (IDS) wet well level climbed above the overflow level, yet the pumps were not running. This resulted in an overflow at this process location, sending untreated sewage into the WWTP’s main effluent outfall, Outfall 002. Operators determined that the primary pump-controlling level sensor was not correctly registering the level rise in the wet well. Operators immediately switched to the secondary level sensor as the main pump control device. The pumps turned on and lowered the wet well level. 8:26am Wet well levels returned to normal and overflow to Outfall 002 ceased. 9:00am Plant flow was still elevated due to rain. There was a power bump causing faults at the WWTP and main sewer lift station, Pump Station 4. The primary pumps at Pump Station 4 faulted and temporarily shut off. They were immediately reset and restarted. 9:04am The WWTP influent flow momentarily dropped from 9 Million Gallons per Day (MGD) to 1.5 MGD after pumps shut off at Pump Station 4. WWTP Trickling Filter Wet Well Pumps slowed down to minimum speed due to influent flow reduction. The WWTP influent flow returned to 9.5 MGD when Pump Station 4 restarted and flow reached the plant. The sudden increase in flow led to a rapidly rising Trickling Filter Wet Well level. The pump control response struggled to match the rise rate before the wet well level reached the overflow point. Overflow at this process location consists of primary treated sewage that bypasses secondary treatment and disinfection before entering the main effluent outfall 002. 9:05am WWTP Trickling Filter Wet Well pumping speed reached capacity and matched incoming flow rates. Overflow into the outfall stopped. Summary The primary Influent Diversion Structure (IDS) wet well level sensor had failed and was incorrectly measuring a value in the normal range, so it did not indicate an alarm or failure. Consequently, when the level began to rise, the sensor failed to register the increase that would have triggered the pumps. This sensor will be replaced. Sewage is only diverted to the IDS wet well when plant flows reach ≈20 MGD or higher. Thus, pumping at this process location is not continuous and only required when the level rises due to heavy rain and the diversion of high flows into the wet well. Additionally, it has been determined the Trickling Filter Wet Well level sensor serving as primary during this event did not recognize the level increase as instantly as the secondary sensor. The secondary sensor October 6, 2026 L - 2 will be set and fixed as the primary sensor until this issue is resolved by adjustment or replacement. In typical flow circumstances, the difference in reactivity between the two sensors is negligible. We are actively seeking solutions to improve the response during rapid level rise. Funding Overview: N/A Attachment: IDS Sensor Photo below, Outfall Site Map October 6, 2026 L - 3 002 October 6, 2026 L - 4