Loading...
HomeMy WebLinkAbout10282026 PC Regular Meeting Agenda PacketREGULAR MEETING AGENDA PLANNING COMMISSION October 28, 2026 6:00 - 8:00 PM Notice is hereby given that the Port Angeles Planning Commission will meet on Wednesday, October 28, 2026 located at 321 E. 5th Street, Port Angeles, WA. This meeting will be conducted as a hybrid meeting. In hybrid meetings, members of the public, Committee members, and City staff have the option to attend the meeting in person at City Hall or remotely through the Webex virtual meeting platform. For those planning to attend remotely, learn how to watch the meeting live and participate during the public comment period by visiting: https://www.cityofpa.us/Live- Virtual-Meetings For audio only please call: 1-844-992-4726 Use access code: 2555 220 2195 Webinar password: PC10282026 (72102820 when dialing from a phone or video system) Once connected, press *3 to raise your virtual hand if you wish to make a comment or public testimony. You will be notified when it is your turn to speak. This access code will work for the October 28, 2026 meeting only. If you are joining the meeting through the Webex link and wish to make a comment or provide public testimony, please use the “raise your hand” feature in Webex. You will be notified when it is your turn to speak. Virtual Webex Meeting Link: https://cityofpa.webex.com/cityofpa/j.php?MTID=m1c8ac597e62672c35401afa4c33e2e9b The meeting is open to the public. I.CALL TO ORDER II.ROLL CALL III.PUBLIC COMMENT IV.APPROVAL OF MINUTES Minutes of the September 23, 2026 Meeting V.ACTION/DISCUSSION ITEMS 1.Action: Facade Grant 26-0003 related to a sign request for Sound Bikes and Kayaks Discuss and approve FSG 26-0003 for Sound Bikes and Kayaks, located at 120 E Front St, to replace the existing sign to match the updated Art Deco facade. 2.Action: Facade Grant 26-0004 related to a sign request for Studio Bob Discussion and approval of FSG 26-0004 for Studio Bob, located at 118 E Front St, to replace the existing sign with one that matches the updated Art Deco facade. 3.Discussion: Municipal Code Amendment MCA 26-0286 related to regulation of Data Centers City staff will present proposed municipal code amendments to Title 17 related to data centers for the Planning Commission’s discussion. VI.STAFF UPDATES 1.Monthly Customer Service Report 2.Monthly Type 0/OTC Report 3.Monthly 5290 Report 4.Monthly Affordable Housing Report 5.Monthly Natural Resources Verbal Report 6.Monthly Building Report 7.Quarterly Licensing Report 8.Quarterly Grant Report VII.REPORTS OF COMMISSION MEMBERS VIII.PUBLIC COMMENT IX.ADJOURNMENT PLANNING COMMISSION MEETING Port Angeles, Washington September 23, 2026 This meeting was conducted as a hybrid meeting. CALL TO ORDER - REGULAR MEETING Vice Chair Kiedrowski called the regular meeting of the Port Angeles Planning Commission to order at 6:00 p.m. ROLL CALL Planning Commission Vice Chair Kiedrowski; Commissioners: Schorr, Mellema, Vogel, Omega Members Excused Absent: Chair Steiger and Commissioner Vanderlugt Staff Present: Community and Economic Development Director Shannen Cartmel, Planning Supervisor Ben Braudrick, Long Range and Special Projects Administrator Angel Torres, Housing Administrator Jalyn Boado, Natural Resources and Grant Administrator Courtney Bornsworth, Senior Development Services Specialist Pat Bartholick, Building Inspector/Licensing Administrator Chris Jackson, CED Technician II Triston Carlstrom. PUBLIC COMMENT Casey B., Resident, is the owner and operator of NW Tree Service. Spoke about the tree protections on marine bluffs affecting view corridors, with lengthy and unpredictable permitting processes that limit homeowners. The enhanced viewshed permitting is cost-prohibitive for homeowners. How does the City establish when and how to charge homeowners? Emphasized the importance of predictable permitting timelines. John R., Resident, is concerned about the critical areas ordinance map in the agenda packet. Discussed that wetlands are delineated on some maps, but not on the critical areas map. Dan B., Resident, is confused about the intent of tonight's discussion. Asked whether the City will restrict view enhancement and tree trimming. Expressed that the City of Port Angeles is responsible for the bluff's ongoing degradation due to stormwater outfall. Raised drainage and slope-stability concerns about the Brix Marine project. Lynn B., Resident, asked the City to preserve a practical process for careful tree pruning and view maintenance on bluff properties. Supported protecting tree roots and slope stability. Stated the views of the strait affect property value and asked that owners using approved methods be able to maintain them. Kelly J., Resident, spoke as the owner of the Courthouse Condominiums. Described the HOA’s small-scale work with a certified arborist to thin vegetation without clear-cutting or disturbing roots. Supported bluff protection and requested clear guidance that allows responsible owners to maintain vegetation safely. Ruth G., Resident, purchased the property she lives at for the view; the property is assessed as a waterfront view property. Requested consistent guidance and reasonable permit timelines. Expressed concern that unclear rules could lead to unpermitted work. AGENDA ITEMS 1.Action Item: APPROVAL OF MINUTES of the August 26, 2026, Meeting It was moved by Vogel and seconded by Shorr to: Approve the August 26, 2026, meeting minutes. Motion carried 5-5. October 28, 2026 Planning Commission Regular Meeting 1 CITY OF PORT ANGELES PLANNING COMMISSION – September 23, 2026 Page 2 of 4 2.Action Item: Public Hearing for MCA 26-0090 Critical Areas Ordinance Update. A municipal code amendment to Title 15 to update the Critical Areas Ordinance to comply with state law and the best available science. Planner Bornsworth presented the staff report for MCA 26-0090 to the Planning Commission. Vice Chair Kiedrowski opened the public hearing. Public Hearing Public Comment: Casey B, Resident, understands the Environmentally Sensitive Areas Exemptions (ESEs) requirements are similar. The City will not sign off on a permit for property that they own; compares ESEs to R ight of Way permits. There is destruction of public property in the Tumwater Creek corridor. Questioned the consistency and impartiality of City permitting decisions, using other development and drainage reviews as comparisons. Lynn B., Resident, restated her request for a workable way to maintain views through careful, approved pruning. Bryan J., Resident, lives on the bluff. Questioned how the ordinance affects existing homes. Asked how homeowners can address bluff stability before it becomes an emergency? As property owners living on the bluff, they have more at stake. The City should look into cost-saving measures for bluff stability and permitting. Frustration with uncertainty is real, and the process should be easy for professionals to navigate. Requested affordable, repeatable maintenance procedures and standards that qualified local contractors could follow. Renee (Penny) S., Resident, The City needs a common-sense approach to code changes related to view enhancements and bluff stability. Citizens must pay to maintain the bluff. A certified arborist is needed in the current permitting process, and the current system is working. Many of the City's parcels are paid for by the general public. Expressed that the City’s approval should be automatic. Dan B., Resident, asked whether the City would approve view work on City-owned property. Repeated his concerns about drainage and slope stability at the Brix Marine project, including his view that its proposed wall and drainage approach may be inadequate. William D., Resident, supported other bluff residents’ concerns about property values and drainage maintenance. Tony D., Resident, described earlier permission and arborist-assisted work to maintain his view corridor, followed by difficulty obtaining later approvals. Questioned the delays, costs, and effect of changed requirements on his view and property value. Jenessa B., Resident, described an environmentally sensitive area application returned as incomplete while the City assesses management of its urban forest and City-owned property. Said the required City-owner signature makes the process unclear and delays work for local contractors. Shane Park has been closed since June 12 due to hazardous trees. Questioned whether the City plans to take on view enhancement itself. Feels ignored. John R., Resident, Environmental permitting processes have become cumbersome, especially with bluff/sloping property. Spoke about the next steps at City Council. Kelly J., Resident, clear and reasonable vegetation laws are needed. A neighbor illegally clear -cut a bluff property with little to no follow-up from Code Enforcement. There have also been encampments at the bottom of the bluffs and ravine, with no timely action. Stated that the City is making processes harder for rule-abiding citizens. Asked the Commission to consider the experience of longtime residents and contractors. Requested a workable path for owners trying to comply. Vice Chair Kiedrowski closed the public hearing. Commissioner Discussion October 28, 2026 Planning Commission Regular Meeting 2 CITY OF PORT ANGELES PLANNING COMMISSION – September 23, 2026 Page 3 of 4 Commissioner Vogel, asked when the mapping will be done and brought before the Planning Commission? Has concerns over the critical aquifer recharge areas. Manufacturing and industrial uses are not allowed in the critical aquifer recharge areas. Suggests that, in the future, the maps be brought before the Planning Commission beforehand. Commissioner Shorr, flagged “hobby farms” in PAMC 15.22.240 B appearing in two “high” and “moderate” land- use intensity categories and duplicate subsection lettering for correction. There is duplicative lettering in PAMC 15.22.230. Asked about the earlier Commission motion concerning wetland buffer Option 3 and WAC exceptions. Vice Chair Kiedrowski, in PAMC 15.22.080 H, the code regarding vegetation management, “non-destructive pruning of vegetation is allowed, provided the trees are not located within a landslide or erosion control hazard area,” seems contradictory to what is being said tonight. It was moved by Kiedrowski and seconded by Shorr to: Recommend exploring a permit and professional-report process that would allow regular bluff vegetation maintenance at a reasonable cost. Motion carried 5-5. It was moved by Vogel and seconded by Shorr to: Recommend approval of MCA 26-0090 to the City Council, provided the maps referenced in the ordinance are returned to the Planning Commission for review. Motion carried 5-5. STAFF UPDATES Customer Service Report Senior Development Services Specialist Bartholick gave a brief update on customer service interactions in August 2026. Monthly Type 0/Over the Counter Report Licensing Administrator and Building Inspector Jackson reported that 334 over-the-counter permits have been issued year-to-date. Monthly 5290 Report Licensing Administrator and Building Inspector Jackson gave a brief report on the 5290 permitting timelines for August 2026. Monthly Affordable Housing Report Housing Administrator Boado-Sousa gave a brief update about affordable housing programs. CED awarded $10K in waiver permitting fees in August 2026 and issued eight preliminary MFTE certificates . Monthly Natural Resources Report Natural Resources and Grant Administrator Bornsworth shared that CED is currently processing multiple SEPA applications and one Shoreline Substantial Development permit. Monthly Land Use Permitting and Economic Development Report Long-range and special projects Administrator Torres highlighted the economic development industry summit, which will take place in late January 2027. October 28, 2026 Planning Commission Regular Meeting 3 CITY OF PORT ANGELES PLANNING COMMISSION – September 23, 2026 Page 4 of 4 Monthly Building Report Senior Development Services Specialist Bartholick gave the August 2026 building report, which showed 39 building permits were issued. Growth Management Act Report Planning Supervisor Braudrick shared that the City of Port Angeles is now GMA compliant and can move forward with grant applications and thanked the Planning Commission for all their hard work to get the ordinances across the finish line. COMMISSION REPORTS No Commission Reports. SECOND PUBLIC COMMENT None received. ADJOURNMENT Vice Chair Kiedrowski adjourned the meeting at 7:48 p.m. _____________________________________ _______________________________ Dallas Kiedrowski, Vice Chair Jalyn Boado, Secretary October 28, 2026 Planning Commission Regular Meeting 4 TO: Planning Commission Courtney Bornsworth, Natural Resources & Grant Administrator October 28, 2026 Sign Grant Application for Sound Bikes & Kayaks (Grant No. 26-0003) Maura Treacar, 120 E Front St, Port Angeles, WA 98362 Angeles Properties, LLC, PO Box 206, Palos Heights, IL 60463 120 E Front St, Port Angeles, WA 98362 Sound Bikes & Kayaks is requesting funding for the development of an updated sign on the building located at 120 E Front St, Port Angeles, WA 98362 (Grant No. 26-0003). The applicant is requesting these funds as part of a larger effort to restore the façade of the building which was previously approved under FSG 26-0002. A more in-depth description of the proposed work and its intended outcome can be found in “Attachment A” to this document. The desired result of this proposal is to improve the signage on the façade to match the updated art deco features of the restored facade. The Community Façade and Sign Improvement Program was authorized by the City Council through the passing of ordinance #3476. This authorization is represented in Chapter 2.80 of the Port Angeles Municipal Code. The Program will provide a grant for funding of façade improvements that will enhance the physical appearance, accessibility, and overall value of individual buildings as well as the surrounding downtown area. In evaluating proposals for funding, Staff reviewed the “Evaluation criteria and prioritization” of Section 2.80.110: 1.Private contribution over and above the required match; Staff Analysis: Per the submitted narrative, application, and invoice, the applicant is providing the required 50 percent match. The applicant is ready to begin work as soon as the grant approval process is complete. October 28, 2026 Planning Commission Regular Meeting 5 Sound Bikes & Kayaks at 120 E Front St, FSG 26-0003 October 28, 2026 Page 2 2.Present condition of existing façade/sign: Staff Analysis: As seen in Figure 1, the existing sign is mismatched and dated. It includes a mix of upper and lowercase letters, spanning 22’ across with letters ranging in height from 13 – 18 inches. The proposed changes will assist in matching the new branding and updated façade approved under FSG 26-0002. It will also match the style of the adjacent business, Studio Bob, creating a unified and visually appealing front for both businesses. 3.The building’s overall public visibility; Staff Analysis: The building is highly visible along the Front Street corridor. It sits directly across from the Gateway Center, Ferry Terminal Parking, and traffic passing through Downtown by both foot and automobile. 4.Expected increase in assessed value of improvement; Staff Analysis: The improvements to the signage are in line with the purpose of the grant and will undoubtedly increase the assessed value of the structure. Figure 1 Present Condition of Signage - Facing South on Front ST October 28, 2026 Planning Commission Regular Meeting 6 Sound Bikes & Kayaks at 120 E Front St, FSG 26-0003 October 28, 2026 Page 3 5.Historic Preservation; Staff Analysis: City records for the structure date back to 1925. The building was originally constructed as an office and retail block by Julius Kirshberg. The original tenant, M & S (Mullen and Schuller) Realty, was eventually joined by a café and the Pay ‘n Takit Store. Over the years, a bowling alley was opened on the second floor, as well as a lodge hall. The basement is part of the City’s Underground and Heritage Tours. Though significantly modified, modernized, and adjusted over time, the building provides an important historical contribution to understanding the overall integrity of the downtown area. It is likely that the building predates historic designation requirements. The changes being proposed to the sign are not significant enough to be a future detriment to the historic character of the original structure. Additionally, the original sign for the building (M & S Realty Bldg.) is currently being restored under previously approved façade improvement grant FSG 26-0002. Figure 2 Image of the proposed rendering for the updated signs - Facing South on Front St October 28, 2026 Planning Commission Regular Meeting 7 Sound Bikes & Kayaks at 120 E Front St, FSG 26-0003 October 28, 2026 Page 4 6.Context in the block or neighborhood; Staff Analysis: The building is in the Central Business District, a highly visible and accessible location for all visitors to the Downtown Corridor. It is adjacent to Olympic Stationers and Captain T’s Shirt Shop. 7.Benefit partner projects on same block; Staff Analysis: Numerous façade improvement grants have been awarded to buildings on the same block in the past. FSG 26-0002 was approved earlier this year for the façade improvements to the subject building. In 2025, The Hubbub, LLC was awarded a façade improvement grant for their building located at 117 N Lincoln St. HarborTowne, LLC has received grant awards in multiple years including 2013, 2019, and 2024 for their building located at 222 N Lincoln St. The Kokopelli Grill and Coyote BBQ building located at 201 E Front St received awards in 2015 and 2016. The Metta Room building located at 132 E Front St received an award in 2016 for their building located at 132 E Front St. Outside of the immediate block, multiple additional façade improvement grants have been awarded to various locations along the First and Front Street Corridors. FINDINGS, CONDITIONS & CONCLUSIONS Staff determine the following findings based on Staff’s review of the Program’s criteria: Findings 1.The Façade Grant (Application No. 26-0003) was submitted by Maura Treacar to the Department of Community and Economic Development on September 8, 2026. 2.The location of the work proposed is 120 E Front St, Port Angeles, WA 98362. 3.The project site is located within the Central Business District (CBD) zone. 4.The grant request includes the modernization of signage, including: a.The development of 3D lettering to be installed on the updated façade. 5.The application was reviewed by Planning Division Staff under the Façade and Sign Grant Program criteria, as included in Chapter 2.80 of the Port Angeles Municipal Code. 6.The applicant is requesting $931.68.00 toward signage improvements valued no more than $1,863.36. 7.The request will be heard by the Planning Commission at the regularly scheduled meeting October 28, 2026. Conclusions Based on the findings above, Staff makes the following conclusions: 1.Grant Application No. 26-0003 is found to provide for signage improvements that will enhance the physical appearance and overall value of the Front corridor. 2.Grant Application No. 26-0003 is found to meet the grant program’s criteria as included in Section 2.80.110 of the Port Angeles Municipal Code. October 28, 2026 Planning Commission Regular Meeting 8 Sound Bikes & Kayaks at 120 E Front St, FSG 26-0003 October 28, 2026 Page 5 3.Therefore, Staff is recommending support of approval of the grant proposal with conditions of approval that outlines the requirements of the final award of funding. Conditions Based on Staff’s finding and conclusions, the following conditions are placed on this grant application approval: 1.Upon the October 28th, 2026 Planning Commission’s approval, the applicant may proceed with the expenditures detailed in the application. 2.The applicant shall sign a grant contract with the City of Port Angeles for the reimbursement of a maximum amount of $931.68 for signage improvements. The applicant will be given 180 days to submit reimbursement of expenditures associated with the approved grant proposal as of the Planning Commission action. If progress on the project can be demonstrated, the applicant may request one 180-day extension of the contract. 3.Prior to contract signature, signed letters from the proposal’s property owners granting consent to the signage work on their property shall be provided to the Planning Division. The letters should indicate the acceptance of the 5-year requirement to preserve the grant work (Per standard contract language). 4.The applicant shall submit invoices for total reimbursement with a coversheet detailing each invoice number, amount, and type of payment and not exceeding the awarded grant amount. Reimbursement by the City will occur within 30 days of submission. 5.Prior to reimbursement, the property must be available to Staff for a site visit on the property confirming the work was done according to the approved grant application. 6.A building permit shall be required and submitted to the Department of Community & Economic Development for any and all construction work beyond repair. 7.Any labor performed in association with the grant proposal over $2,000.00 must meet federal prevailing wage standards. A.Application materials October 28, 2026 Planning Commission Regular Meeting 9 Page 1 Department of Community & Economic Development 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us FSG PROGRAM OVERVIEW In 2009 the City Council authorized a Facade and Signage Improvement Program aimed at addressing ongoing concerns with the physical appearance of the downtown and commercial areas. The program was established using Community and Development Block Grant income to provide matching grants to business and property owners that wish to renovate, enhance, and improve highly visible buildings along core commercial corridors throughout the City. GRANT INFORMATION The program allows applicants to request up to: 1. $10,000 for facade improvement; and/or 2. $1,000 for signage improvements. Funding will be matched by 50 percent of total project cost up to the $10,000 and $1,000 maximum funding availability. For instance, a project requesting a $10,000 grant award will require a minimum $20,000 total project cost. *Permit costs are not available for use as an award or match. EVALUATION CRITERIA & PRIORITIZATION Unfortunately, funding for this program is limited and not all eligible proposals are guaranteed funding. Projects will be evaluated competitively by the Community and Economic Development staff based on the following criteria: 1.Private contribution over and above the required match 2.Present condition of existing facade or signage 3.The building’s overall public visibility (i.e., the building’s relationship to commercial streets, public parks, etc.) 4.Expected increase in assessed value of improvement 5.Historic preservation and/or rehabilitation 6.Support the character of the neighborhood and streetscape 7.Priority will be given to projects that benefit partner projects on same block INFORMATION & AWARD PACKET CONTENTS Prior to application to the Facade and Sign Improvement Program, Please carefully review the following pages: Page 1: Facade and Sign Improvement Program Overview Page 2: Program Eligibility - Is your project Eligible? Page 3: Summary of 3-Step Application Process - STEP 1 Page 4: Summary of 3-Step Application Process - STEPS 2 & 3 + Program Contact Information Page 5: Facade and Signage Grant Application Checklist Page 6: Facade and Signage Grant Application 201 FACADE & SIGN IMPROVEMENT PROGRAM GRANT INFORMATION & APPLICATION Attachment A October 28, 2026 Planning Commission Regular Meeting 10 Page 2 IS YOUR PROJECT ELIGIBLE? ELIGIBILITY CRITERIA 1.Location: a property must be located in one of the following: Commercial Arterial (CA), Commercial Shopping District (CSD), Commercial Neighborhood (CN), Commercial Office (CO), and Commercial Business District (CBD) zones or be a conforming commercial use in a non-commercial zone. 2.The owner, for himself and his successors, shall agree to maintain improvements for a minimum of a five-year period. 3.The project shall increase taxable value of building and shall be considered new construction or be a project on property that is not subject to property tax but that does increase the valuation of surrounding property. 4.All funded activities must comply with federal, state and local laws pertaining to labor standards and payment of prevailing wages for contracted work. ELIGIBLE PROGRAM ITEMS The following shall be eligible for funding through the program: 1.Rehabilitation, reconstruction, or restoration to the exterior, streetside of a building facade 2.Glass, windows, doors, trim, and accessories that are part of the streetside facade 3.Signage 4.Awnings, canopies, fences, and landscaping features 5.Street grade entrances which contribute to activity along street edge 6.Professional architectural/design/contractor fees as deemed appropriate for eligible projects *Eligible projects must be for improvements to facades or signs and will require all applicable building and/or sign permits. Applicants are not eligible for both a facade and a sign grant in the same application cycle. * Improvements must conform to the City’s building and zoning codes (PAMC 14 & 17). * Sign projects must conform to the City of Port Angeles’ Sign Ordinance (PAMC 14.36). INELIGIBLE PROGRAM ITEMS The following shall not be eligible for funding through the program: 1.Interior improvements 2.Roof repairs 3.Non-street facing entrances 4.Signs resulting in an increase in sign area as defined by PAMC 14.36.020 and fluttering devices/banners, billboards, moving/rotating signs, temporary signs, reader boards, anything that flashes or adds glare onto public ways or adjacent properties. 5.Buildings and signs for residential and governmental uses are not eligible. 6.Non-permanent or temporary structures. Attachment A October 28, 2026 Planning Commission Regular Meeting 11 Page 3 THE 3 STEP APPLICATION PROCESS - STEP 1 STEP 1: APPLICATION SUBMISSION The first step in applying for the facade and sign improvement program is to have a plan for review. A pre-application meeting with Community and Economic Development Staff is recommended to find out whether or not a grant is eligible for the business’ location and to discuss specific plans for the facade and/or signage. After a pre-application meeting, an application can be submitted with these other attachments: 1. Detailed Project Narrative Description The project narrative should relate how the project will fulfill the criteria that staff will use to review the application. Specifically: 1.In detail, what improvements are being done and why they are necessary. 2.The history of the building. 3.How the project will benefit the community and the immediate streetscape. 4.The project start and finish dates. 2. Detailed Project Budget The Project Budget should identify each component mentioned (including labor at a prevailing wage) and a detail of each component part, cost of unit, number of units, and total cost. For projects of complexity, a cover sheet showing total component costs split into labor and materials helps the Planning Department complete a staff report more quickly. 3. Photographs of Current Conditions Photographs of the facade or sign are mandatory. Photographs of facade or sign details are helpful. 4. Renderings of Proposed Changes An “after picture”, rendering, or engineering/architectural document showing the finished product is mandatory for an application to be deemed complete. Please submit color renderings. Material examples can also be helpful for staff and Planning Commission members to understand the final product. 5. Federal W-9 Form This form should identify the individual or organization to be reimbursed. If the recipient is an organization or business, proof must be provided that the grant signatory has the authority to sign. The digital form can be found at https://www.irs.gov/pub/irs-pdf/fw9.pdf 6. Facade & Sign Grant Application Checklist SUBMISSION OF AN APPLICATION SHALL INCLUDE ALL SIX OF THESE REQUIRED ATTACHMENTS Attachment A October 28, 2026 Planning Commission Regular Meeting 12 Page 4 THE 3 STEP APPLICATION PROCESS - STEPS 2 & 3 STEP 2: PLANNING COMMISSION MEETING Upon receiving a complete application, the Planning Division will produce a staff report, which, when finished, will then be placed on the on the next available Planning Commission agenda for review. After reviewing the application, staff report, and staff recommendations, the Planning Commission will approve or deny the grant proposal. * For the Planning Commission to move for approval of a grant, the applicant or a representative must be present in the audience to make comment or answer any question Commissioners may have concerning the application and staff report. * PLEASE UNDERSTAND THAT APPROVAL by Planning Commission and the signing of a grant agreement does not constitute the issuance of a building permit or land use permit. Permitting should be sought following the approval of the Planning Commission STEP 3: GRANT AGREEMENT AND REIMBURSEMENT Once the grant has been approved by the Planning Commission, the City of Port Angeles will draft and agreement for the payment of the grant amount approved by the Planning Commission. Drafting an agreement may take up to two weeks, so planning a project timeline to reflect this additional period of time is essential for reimbursement. * Projects must be completed within six months of being awarded a grant. Failure to meet this timeline may result in nullification of the grant contract *** IMPORTANT INFORMATION CONCERNING PAYMENTS *** 1.Any work billed, or materials invoiced, before the date signed by the applicant on the agreement with the City of Port Angeles will NOT be available for grant funding. Having correct, easily understandable documents will assist staff in drafting an agreement in a shorter period of time. 2.Any payments brought in must have a proof of price and a transaction. This can be through invoice, credit card receipt, or a copy of a valid check or money order. 3.The city can only pay 50 percent of any payment brought in, up to the agreed upon grant amount. If a grant recipient brings in an invoice with proof of payment for $2,000.00, the City will reimburse up to $1,000.00, or up to the remaining available agreed upon reimbursement amount. 4.Payments are mailed to the applicant every other Friday. Project invoicing and proof of payment must be brought in the week before the payment date for review and approval. Payment will be made within 30 days of reimbursement submission. QUESTIONS? After reviewing the Information & Award process handout, please direct all questions regarding the Facade and Sign Grant Program or Application to: Courtney Bornsworth, Associste Planner Phone: (360) 417-4750 E-mail: ced@cityofpa.us Attachment A October 28, 2026 Planning Commission Regular Meeting 13 Page 5 FACADE & SIGN GRANT APPLICATION CHECKLIST FSG 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us An application will NOT be considered complete until all element have been completed in the following checklist. Check all that apply: Application Form Project Narrative explaining need for improvement and what is being improved. Project Budget Details: Cover page including: Individual Elements (Windows, Paint, Facia, etc.) Separating Labor and Materials Total Project Cost without Tax Contractor Estimates Before Color Photograph or rendering of each proposed building façade improvement. After Renderings with all work completed Any engineering documents involved in project (If Applicable) FSG ___-____Attachment A October 28, 2026 Planning Commission Regular Meeting 14 Page 6 Department of Community & Economic Development 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us FSG ___-____FSG FACADE AND SIGN GRANT APPLICATION APPLICANT AND PROPERTY OWNER INFORMATION Applicant Name: Mailing Address: Contact Name (or SAME): Contact Phone Number: Email Address: Property Owner Name: Mailing Address: Property Owner Phone Number: …I, the Contact, have read the Facade and Sign Grant Information and Award Cover Sheet Handout and understand both the grant award process and required application materials for submission approval. BUSINESS INFORMATION Business Name: Business Address: Business Type/Description: PROJECT INFORMATION Improvement Type …Facade Grant Brief Project Description: …Sign Grant Start Date: End Date: Project cost: Total Funding requested: (Facade: not to exceed 10k and Sign: not to exceed 1k) PROPERTY OWNER CONSENT (IF NOT THE APPLICANT) The owner(s) of the above property is fully aware and agree to all proposed improvements described in grant application. Applicant must have any changes to project proposal approved by property owner(s) Applicant’s Signature: Date: Property Owner’s Signature: Date: 9/8/26 Attachment A October 28, 2026 Planning Commission Regular Meeting 15 Christopher Allen <chris@studiobob.art> Signature and information needed for Facade Grant Application 3 messages Christopher Allen <chris@studiobob.art>Mon, Jul 13, 2026 at 10:20 AM To: Steven Colompos <scolomposlaw@gmail.com> Steven - I am completing the application for applying for a Facade Grant, and need your signature on the form as owner of the property. A digital signature on the PDF is fine. I also need you to fill out your phone number, as I cannot find it in any of my records. I have attached a rendering of what we would like to do. Please let me know if you have any questions. Chris 2 attachments Studio Bob Rendering_FINAL.png 2506K Facade and Sign Improvement Grant Application_202606111704375020.pdf 573K Steven Colompos <scolomposlaw@gmail.com>Mon, Jul 13, 2026 at 6:46 PM To: Christopher Allen <chris@studiobob.art> I couldn't print the form. The owner of record is Angeles Properties, LLC, not me. I use a 24hr answering machine and fax 708-448-8410. Good luck with the project From: Christopher Allen <chris@studiobob.art> Sent: Monday, July 13, 2026 5:20 PM To: Steven Colompos <scolomposlaw@gmail.com> Subject: Signature and information needed for Facade Grant Application [Quoted text hidden] Christopher Allen <chris@studiobob.art>Mon, Jul 13, 2026 at 8:51 PM To: Steven Colompos <scolomposlaw@gmail.com> Steven - Thanks for getting back on such short notice. I have changed the owner of record to Angeles Properties, LLC. If you, or another representative of Angeles Properties LLC, download the document, there is an option to sign it electronically. It's the option circled in red on the attached screenshot. If you do that, you can save the changes, and then email it back. I can then print it and submit it. I can also find out if any other form of acknowledgment on your part (a letter, an email, something) would be acceptable, but I think they would like a signature of some sort. I was also hoping for clarification on whether we might be receiving financial support from your end, in order to get our budget lined up. Thank you for your consideration. Attachment A October 28, 2026 Planning Commission Regular Meeting 16 Chris [Quoted text hidden] 2 attachments Screenshot 2026-07-13 8.30.42 PM.png 5K Facade and Sign Improvement Grant Application_202606111704375020.pdf 573K Attachment A October 28, 2026 Planning Commission Regular Meeting 17 Sound BIke and Kayak Sign Grant Narrative 118 Front Street was built in 1925, and has served many purposes over the years, including as a department store, Moose Lodge, Karate studio, and most recently, Sound Kayaks and Bikes and Studio Bob. It is located between Lincoln Street and Laurel Street, making it one of the most visible buildings to people coming downtown by car and by the Coho Ferry. Additional information regarding the building can be seen in the document labeled M & S Realty Building History. The current signage for Sound BIke and Kayak is a mixture of fonts from an old logo (Sound Bikes) and the addition of a different part of the business (Kayaks). It includes a mix of uppercase and lower case letters. This signage measures 22’ across. The lowercase letters are approx 13” tall, and the uppercase letters are approx. 18” tall. We would like to update the font to match our new branding, and to fit it to the original length. All the letters would be the same height, of 15”, which would match the letters of the word ‘Studio’ in the sign for our upstairs business partner, Studio Bob. This would create a unified and visually appealing front for both businesses. Installation would be completed by owners, and is not included as part of the budget. Attachment A October 28, 2026 Planning Commission Regular Meeting 18 Invoice Date 8/14/2026 Invoice # 3891 Bill To Sound Bikes & Kayaks Bailey Signs & Graphics 108 S. Lincoln Street Port Angeles, WA 98362 360-417-2690 P.O. No.Terms Due on receipt Project Total DescriptionQuantity Rate Amount 3D Lettering, Dynofaom Standard, black with foam mounting tape and pen plot1 1,863.86 1,863.86 tax1 165.89 165.89 $2,029.75 Attachment A October 28, 2026 Planning Commission Regular Meeting 19 Attachment A October 28, 2026 Planning Commission Regular Meeting 20 Attachment A October 28, 2026 Planning Commission Regular Meeting 21 TO: Planning Commission Courtney Bornsworth, Natural Resources & Grant Administrator October 28, 2026 Sign Grant Application for Studio Bob (Grant No. 26-0004) Christopher Allen, 118 ½ E Front St, Port Angeles, WA 98362 Angeles Properties, LLC, PO Box 206, Palos Heights, IL 60463 118 ½ E Front St, Port Angeles, WA 98362 RECOMMENDATION: Staff recommends the Planning Commission approve the sign grant award amount of $650.50 toward the development of a new sign for the business located at 118 ½ E Front St, Port Angeles, WA (Grant No. 26-0004). PROJECT SUMMARY Studio Bob is requesting funding for the development of an updated sign on the building located at 118 ½ E Front St, Port Angeles, WA 98362 (Grant No. 26-0004). The applicant is requesting these funds as part of a larger effort to restore the façade of the building which was previously approved under FSG 26-0002. A more in-depth description of the proposed work and its intended outcome can be found in “Attachment A” to this document. The desired result of this proposal is to improve the signage on the façade to match the updated art deco features of the restored facade. The Community Façade and Sign Improvement Program was authorized by the City Council through the passing of ordinance #3476. This authorization is represented in Chapter 2.80 of the Port Angeles Municipal Code. The Program will provide a grant for funding of façade improvements that will enhance the physical appearance, accessibility, and overall value of individual buildings as well as the surrounding downtown area. In evaluating proposals for funding, Staff reviewed the “Evaluation criteria and prioritization” of Section 2.80.110: 1.Private contribution over and above the required match; Staff Analysis: Per the submitted narrative, application, and invoice, the applicant is providing the required 50 percent match. The applicant is ready to begin work as soon as the grant approval process is complete. October 28, 2026 Planning Commission Regular Meeting 22 Studio Bob at 118 ½ E Front St, FSG 26-0004 October 28, 2026 Page 2 2. Present condition of existing façade/sign: Staff Analysis: As seen in Figure 1, the existing sign is mismatched and dated. For many years, there were signs for two businesses, Studio Bob and Art Front, both of which were owned by Bob Stokes. Art Front no longer exists, and the signage has since been taken down. Studio Bob is proposing to increase the size of the Studio Bob sign to take up the Art Front sign square footage, creating a larger visual clue as to where Studio Bob is. The font of the sign would not change. The size of the name Bob would not change (24” tall for the capital B); the letters in the word Studio would be increased to 15” high and spaced out further to match the square footage of the two original business signs, and to match the size of the lettering in the neighboring business, Sound Bikes and Kayaks. This would create a more unified effect for both businesses. 3. The building’s overall public visibility; Staff Analysis: The building is highly visible along the Front Street corridor. It sits directly across from the Gateway Center, Ferry Terminal Parking, and traffic passing through Downtown by both foot and automobile. Figure 1 Present Condition of Signage - Facing South on Front ST October 28, 2026 Planning Commission Regular Meeting 23 Studio Bob at 118 ½ E Front St, FSG 26-0004 October 28, 2026 Page 3 4.Expected increase in assessed value of improvement; Staff Analysis: The improvements to the signage are in line with the purpose of the grant and will undoubtedly increase the assessed value of the structure. 5.Historic Preservation; Staff Analysis: City records for the structure date back to 1925. The building was originally constructed as an office and retail block by Julius Kirshberg. The original tenant, M & S (Mullen and Schuller) Realty, was eventually joined by a café and the Pay ‘n Takit Store. Over the years, a bowling alley was opened on the second floor, as well as a lodge hall. The basement is part of the City’s Underground and Heritage Tours. Though significantly modified, modernized, and adjusted over time, the building provides an important historical contribution to understanding the overall integrity of the downtown area. It is likely that the building predates historic designation requirements. The changes being proposed to the sign are not significant enough to be a future detriment to the historic character of the original structure. Additionally, the original sign for the building (M & S Realty Bldg.) is currently being restored under previously approved façade improvement grant FSG 26-0002. October 28, 2026 Planning Commission Regular Meeting 24 Studio Bob at 118 ½ E Front St, FSG 26-0004 October 28, 2026 Page 4 Figure 2 Image of the proposed rendering for the updated signs - Facing South on Front St 6. Context in the block or neighborhood; Staff Analysis: The building is in the Central Business District, a highly visible and accessible location for all visitors to the Downtown Corridor. It is adjacent to Olympic Stationers and Captain T’s Shirt Shop. 7. Benefit partner projects on same block; Staff Analysis: Numerous façade improvement grants have been awarded to buildings on the same block in the past. FSG 26-0002 was approved earlier this year for the façade improvements to the subject building. In 2025, The Hubbub, LLC was awarded a façade improvement grant for their building located at 117 N Lincoln St. HarborTowne, LLC has received grant awards in multiple years including 2013, 2019, and 2024 for their building located at 222 N Lincoln St. The Kokopelli Grill and Coyote BBQ building located at 201 E Front St received awards in 2015 and 2016. The Metta Room building located at 132 E Front St received an award in 2016 for their building located at 132 E Front St. Outside of the immediate block, multiple additional façade improvement grants have been awarded to various locations along the First and Front Street Corridors. October 28, 2026 Planning Commission Regular Meeting 25 Studio Bob at 118 ½ E Front St, FSG 26-0004 October 28, 2026 Page 5 FINDINGS, CONDITIONS & CONCLUSIONS Staff determine the following findings based on Staff’s review of the Program’s criteria: Findings 1.The Façade Grant (Application No. 26-0004) was submitted by Maura Christopher Allen to the Department of Community and Economic Development on September 8, 2026. 2.The location of the work proposed is 118 ½ E Front St, Port Angeles, WA 98362. 3.The project site is located within the Central Business District (CBD) zone. 4.The grant request includes the modernization of signage, including: a.The development of 3D lettering to be installed on the updated façade. 5.The application was reviewed by Planning Division Staff under the Façade and Sign Grant Program criteria, as included in Chapter 2.80 of the Port Angeles Municipal Code. 6.The applicant is requesting $650.50 toward signage improvements valued no more than $1,301.00. 7.The request will be heard by the Planning Commission at the regularly scheduled meeting October 28, 2026. Conclusions Based on the findings above, Staff makes the following conclusions: 1.Grant Application No. 26-0004 is found to provide for signage improvements that will enhance the physical appearance and overall value of the Front corridor. 2.Grant Application No. 26-0004 is found to meet the grant program’s criteria as included in Section 2.80.110 of the Port Angeles Municipal Code. 3.Therefore, Staff is recommending support of approval of the grant proposal with conditions of approval that outlines the requirements of the final award of funding. Conditions Based on Staff’s finding and conclusions, the following conditions are placed on this grant application approval: 1.Upon the October 28th, 2026 Planning Commission’s approval, the applicant may proceed with the expenditures detailed in the application. 2.The applicant shall sign a grant contract with the City of Port Angeles for the reimbursement of a maximum amount of $650.50 for signage improvements. The applicant will be given 180 days to submit reimbursement of expenditures associated with the approved grant proposal as of the Planning Commission action. If progress on the project can be demonstrated, the applicant may request one 180-day extension of the contract. 3.Prior to contract signature, signed letters from the proposal’s property owners granting consent to the signage work on their property shall be provided to the Planning Division. October 28, 2026 Planning Commission Regular Meeting 26 Studio Bob at 118 ½ E Front St, FSG 26-0004 October 28, 2026 Page 6 The letters should indicate the acceptance of the 5-year requirement to preserve the grant work (Per standard contract language). 4. The applicant shall submit invoices for total reimbursement with a coversheet detailing each invoice number, amount, and type of payment and not exceeding the awarded grant amount. Reimbursement by the City will occur within 30 days of submission. 5. Prior to reimbursement, the property must be available to Staff for a site visit on the property confirming the work was done according to the approved grant application. 6. A building permit shall be required and submitted to the Department of Community & Economic Development for any and all construction work beyond repair. 7. Any labor performed in association with the grant proposal over $2,000.00 must meet federal prevailing wage standards. A. Application materials October 28, 2026 Planning Commission Regular Meeting 27 Page 1 Department of Community & Economic Development 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us FSG PROGRAM OVERVIEW In 2009 the City Council authorized a Facade and Signage Improvement Program aimed at addressing ongoing concerns with the physical appearance of the downtown and commercial areas. The program was established using Community and Development Block Grant income to provide matching grants to business and property owners that wish to renovate, enhance, and improve highly visible buildings along core commercial corridors throughout the City. GRANT INFORMATION The program allows applicants to request up to: 1. $10,000 for facade improvement; and/or 2. $1,000 for signage improvements. Funding will be matched by 50 percent of total project cost up to the $10,000 and $1,000 maximum funding availability. For instance, a project requesting a $10,000 grant award will require a minimum $20,000 total project cost. *Permit costs are not available for use as an award or match. EVALUATION CRITERIA & PRIORITIZATION Unfortunately, funding for this program is limited and not all eligible proposals are guaranteed funding. Projects will be evaluated competitively by the Community and Economic Development staff based on the following criteria: 1.Private contribution over and above the required match 2.Present condition of existing facade or signage 3.The building’s overall public visibility (i.e., the building’s relationship to commercial streets, public parks, etc.) 4.Expected increase in assessed value of improvement 5.Historic preservation and/or rehabilitation 6.Support the character of the neighborhood and streetscape 7.Priority will be given to projects that benefit partner projects on same block INFORMATION & AWARD PACKET CONTENTS Prior to application to the Facade and Sign Improvement Program, Please carefully review the following pages: Page 1: Facade and Sign Improvement Program Overview Page 2: Program Eligibility - Is your project Eligible? Page 3: Summary of 3-Step Application Process - STEP 1 Page 4: Summary of 3-Step Application Process - STEPS 2 & 3 + Program Contact Information Page 5: Facade and Signage Grant Application Checklist Page 6: Facade and Signage Grant Application 201 FACADE & SIGN IMPROVEMENT PROGRAM GRANT INFORMATION & APPLICATION Attachment A October 28, 2026 Planning Commission Regular Meeting 28 Page 2 IS YOUR PROJECT ELIGIBLE? ELIGIBILITY CRITERIA 1.Location: a property must be located in one of the following: Commercial Arterial (CA), Commercial Shopping District (CSD), Commercial Neighborhood (CN), Commercial Office (CO), and Commercial Business District (CBD) zones or be a conforming commercial use in a non-commercial zone. 2.The owner, for himself and his successors, shall agree to maintain improvements for a minimum of a five-year period. 3.The project shall increase taxable value of building and shall be considered new construction or be a project on property that is not subject to property tax but that does increase the valuation of surrounding property. 4.All funded activities must comply with federal, state and local laws pertaining to labor standards and payment of prevailing wages for contracted work. ELIGIBLE PROGRAM ITEMS The following shall be eligible for funding through the program: 1.Rehabilitation, reconstruction, or restoration to the exterior, streetside of a building facade 2.Glass, windows, doors, trim, and accessories that are part of the streetside facade 3.Signage 4.Awnings, canopies, fences, and landscaping features 5.Street grade entrances which contribute to activity along street edge 6.Professional architectural/design/contractor fees as deemed appropriate for eligible projects *Eligible projects must be for improvements to facades or signs and will require all applicable building and/or sign permits. Applicants are not eligible for both a facade and a sign grant in the same application cycle. * Improvements must conform to the City’s building and zoning codes (PAMC 14 & 17). * Sign projects must conform to the City of Port Angeles’ Sign Ordinance (PAMC 14.36). INELIGIBLE PROGRAM ITEMS The following shall not be eligible for funding through the program: 1.Interior improvements 2.Roof repairs 3.Non-street facing entrances 4.Signs resulting in an increase in sign area as defined by PAMC 14.36.020 and fluttering devices/banners, billboards, moving/rotating signs, temporary signs, reader boards, anything that flashes or adds glare onto public ways or adjacent properties. 5.Buildings and signs for residential and governmental uses are not eligible. 6.Non-permanent or temporary structures. Attachment A October 28, 2026 Planning Commission Regular Meeting 29 Page 3 THE 3 STEP APPLICATION PROCESS - STEP 1 STEP 1: APPLICATION SUBMISSION The first step in applying for the facade and sign improvement program is to have a plan for review. A pre-application meeting with Community and Economic Development Staff is recommended to find out whether or not a grant is eligible for the business’ location and to discuss specific plans for the facade and/or signage. After a pre-application meeting, an application can be submitted with these other attachments: 1. Detailed Project Narrative Description The project narrative should relate how the project will fulfill the criteria that staff will use to review the application. Specifically: 1.In detail, what improvements are being done and why they are necessary. 2.The history of the building. 3.How the project will benefit the community and the immediate streetscape. 4.The project start and finish dates. 2. Detailed Project Budget The Project Budget should identify each component mentioned (including labor at a prevailing wage) and a detail of each component part, cost of unit, number of units, and total cost. For projects of complexity, a cover sheet showing total component costs split into labor and materials helps the Planning Department complete a staff report more quickly. 3. Photographs of Current Conditions Photographs of the facade or sign are mandatory. Photographs of facade or sign details are helpful. 4. Renderings of Proposed Changes An “after picture”, rendering, or engineering/architectural document showing the finished product is mandatory for an application to be deemed complete. Please submit color renderings. Material examples can also be helpful for staff and Planning Commission members to understand the final product. 5. Federal W-9 Form This form should identify the individual or organization to be reimbursed. If the recipient is an organization or business, proof must be provided that the grant signatory has the authority to sign. The digital form can be found at https://www.irs.gov/pub/irs-pdf/fw9.pdf 6. Facade & Sign Grant Application Checklist SUBMISSION OF AN APPLICATION SHALL INCLUDE ALL SIX OF THESE REQUIRED ATTACHMENTS Attachment A October 28, 2026 Planning Commission Regular Meeting 30 Page 4 THE 3 STEP APPLICATION PROCESS - STEPS 2 & 3 STEP 2: PLANNING COMMISSION MEETING Upon receiving a complete application, the Planning Division will produce a staff report, which, when finished, will then be placed on the on the next available Planning Commission agenda for review. After reviewing the application, staff report, and staff recommendations, the Planning Commission will approve or deny the grant proposal. * For the Planning Commission to move for approval of a grant, the applicant or a representative must be present in the audience to make comment or answer any question Commissioners may have concerning the application and staff report. * PLEASE UNDERSTAND THAT APPROVAL by Planning Commission and the signing of a grant agreement does not constitute the issuance of a building permit or land use permit. Permitting should be sought following the approval of the Planning Commission STEP 3: GRANT AGREEMENT AND REIMBURSEMENT Once the grant has been approved by the Planning Commission, the City of Port Angeles will draft and agreement for the payment of the grant amount approved by the Planning Commission. Drafting an agreement may take up to two weeks, so planning a project timeline to reflect this additional period of time is essential for reimbursement. * Projects must be completed within six months of being awarded a grant. Failure to meet this timeline may result in nullification of the grant contract *** IMPORTANT INFORMATION CONCERNING PAYMENTS *** 1.Any work billed, or materials invoiced, before the date signed by the applicant on the agreement with the City of Port Angeles will NOT be available for grant funding. Having correct, easily understandable documents will assist staff in drafting an agreement in a shorter period of time. 2.Any payments brought in must have a proof of price and a transaction. This can be through invoice, credit card receipt, or a copy of a valid check or money order. 3.The city can only pay 50 percent of any payment brought in, up to the agreed upon grant amount. If a grant recipient brings in an invoice with proof of payment for $2,000.00, the City will reimburse up to $1,000.00, or up to the remaining available agreed upon reimbursement amount. 4.Payments are mailed to the applicant every other Friday. Project invoicing and proof of payment must be brought in the week before the payment date for review and approval. Payment will be made within 30 days of reimbursement submission. QUESTIONS? After reviewing the Information & Award process handout, please direct all questions regarding the Facade and Sign Grant Program or Application to: Courtney Bornsworth, Associste Planner Phone: (360) 417-4750 E-mail: ced@cityofpa.us Attachment A October 28, 2026 Planning Commission Regular Meeting 31 Page 5 FACADE & SIGN GRANT APPLICATION CHECKLIST FSG 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us An application will NOT be considered complete until all element have been completed in the following checklist. Check all that apply: Application Form Project Narrative explaining need for improvement and what is being improved. Project Budget Details: Cover page including: Individual Elements (Windows, Paint, Facia, etc.) Separating Labor and Materials Total Project Cost without Tax Contractor Estimates Before Color Photograph or rendering of each proposed building façade improvement. After Renderings with all work completed Any engineering documents involved in project (If Applicable) FSG ___-____Attachment A October 28, 2026 Planning Commission Regular Meeting 32 Page 6 Department of Community & Economic Development 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us 321 E. 5th Street, Port Angeles, WA 98362 360.417.4750 | www.cityof pa.us | ced@cityofpa.us FSG ___-____FSG FACADE AND SIGN GRANT APPLICATION APPLICANT AND PROPERTY OWNER INFORMATION Applicant Name: Mailing Address: Contact Name (or SAME): Contact Phone Number: Email Address: Property Owner Name: Mailing Address: Property Owner Phone Number: …I, the Contact, have read the Facade and Sign Grant Information and Award Cover Sheet Handout and understand both the grant award process and required application materials for submission approval. BUSINESS INFORMATION Business Name: Business Address: Business Type/Description: PROJECT INFORMATION Improvement Type …Facade Grant Brief Project Description: …Sign Grant Start Date: End Date: Project cost: Total Funding requested: (Facade: not to exceed 10k and Sign: not to exceed 1k) PROPERTY OWNER CONSENT (IF NOT THE APPLICANT) The owner(s) of the above property is fully aware and agree to all proposed improvements described in grant application. Applicant must have any changes to project proposal approved by property owner(s) Applicant’s Signature: Date: Property Owner’s Signature: Date: Attachment A October 28, 2026 Planning Commission Regular Meeting 33 Christopher Allen <chris@studiobob.art> Signature and information needed for Facade Grant Application 3 messages Christopher Allen <chris@studiobob.art>Mon, Jul 13, 2026 at 10:20 AM To: Steven Colompos <scolomposlaw@gmail.com> Steven - I am completing the application for applying for a Facade Grant, and need your signature on the form as owner of the property. A digital signature on the PDF is fine. I also need you to fill out your phone number, as I cannot find it in any of my records. I have attached a rendering of what we would like to do. Please let me know if you have any questions. Chris 2 attachments Studio Bob Rendering_FINAL.png 2506K Facade and Sign Improvement Grant Application_202606111704375020.pdf 573K Steven Colompos <scolomposlaw@gmail.com>Mon, Jul 13, 2026 at 6:46 PM To: Christopher Allen <chris@studiobob.art> I couldn't print the form. The owner of record is Angeles Properties, LLC, not me. I use a 24hr answering machine and fax 708-448-8410. Good luck with the project From: Christopher Allen <chris@studiobob.art> Sent: Monday, July 13, 2026 5:20 PM To: Steven Colompos <scolomposlaw@gmail.com> Subject: Signature and information needed for Facade Grant Application [Quoted text hidden] Christopher Allen <chris@studiobob.art>Mon, Jul 13, 2026 at 8:51 PM To: Steven Colompos <scolomposlaw@gmail.com> Steven - Thanks for getting back on such short notice. I have changed the owner of record to Angeles Properties, LLC. If you, or another representative of Angeles Properties LLC, download the document, there is an option to sign it electronically. It's the option circled in red on the attached screenshot. If you do that, you can save the changes, and then email it back. I can then print it and submit it. I can also find out if any other form of acknowledgment on your part (a letter, an email, something) would be acceptable, but I think they would like a signature of some sort. I was also hoping for clarification on whether we might be receiving financial support from your end, in order to get our budget lined up. Thank you for your consideration. Attachment A October 28, 2026 Planning Commission Regular Meeting 34 Chris [Quoted text hidden] 2 attachments Screenshot 2026-07-13 8.30.42 PM.png 5K Facade and Sign Improvement Grant Application_202606111704375020.pdf 573K Attachment A October 28, 2026 Planning Commission Regular Meeting 35 Sign Grant Narrative - Studio Bob 118 Front Street was built in 1925, and has served many purposes over the years, including as a department store, Moose Lodge, Karate studio, and most recently, Sound Kayaks and Bikes and Studio Bob. It is located between Lincoln Street and Laurel Street, making it one of the most visible buildings to people coming downtown by car and by the Coho Ferry. Additional information regarding the building can be seen in the document labeled M & S Realty Building History. For many years, there were signs for two businesses, Studio Bob and Art Front, both of which were owned by Bob Stokes. Art Front no longer exists, and the signage has since been taken down. We would like to increase the size of the Studio Bob sign to take up the Art Front sign square footage, creating a larger visual clue as to where Studio Bob is. The font of the sign would not change. The size of the name Bob would not change (24” tall for the capital B); the letters in the word Studio would be increased to 15” high and spaced out further to match the square footage of the two original business signs, and to match the size of the lettering in the neighboring business, Sound Bikes and Kayaks. This would create a more unified effect for both businesses. Attachment A October 28, 2026 Planning Commission Regular Meeting 36 Invoice Date 8/14/2026 Invoice # 3890 Bill To Studio Bob Bailey Signs & Graphics 108 S. Lincoln Street Port Angeles, WA 98362 360-417-2690 P.O. No.Terms Project Total DescriptionQuantity Rate Amount 3D Lettering, Dynofaom Standard, black with foam mounting tape and pen plot1 1,301.82 1,301.82 tax1 115.87 115.87 $1,417.69 Attachment A October 28, 2026 Planning Commission Regular Meeting 37 Attachment A October 28, 2026 Planning Commission Regular Meeting 38 Attachment A October 28, 2026 Planning Commission Regular Meeting 39 1 DATE: October 28, 2026 TO: Planning Commission FROM: Planning Division RE: Proposed Data Center and Large Power User Regulations – Preliminary Discussion SUMMARY The City is developing data center regulations following the City Council's September 1, 2026, adoption of a temporary moratorium. The proposed regulations are preliminary, have not yet been reviewed by the City Attorney's Office, and are being presented primarily to initiate discussion and receive policy direction from the Planning Commission. The draft is subject to further legal review, technical evaluation, and revisions before formal consideration for adoption. The proposed regulations include a new Port Angeles Municipal Code (PAMC) Chapter 17.28, Data Centers, and amendments to Chapter 13.10 to establish electrical utility requirements for all large power users with electrical demand of 1.5 megawatts (MW) or greater, regardless of land use. Corresponding amendments to the City's Master Fee Schedule will also be developed to address applicable fees and cost recovery associated with implementing and administering these regulations. The proposed framework classifies data centers by facility use and electrical demand, identifies appropriate zoning districts, and addresses electrical utility capacity, infrastructure funding, water use, noise, emergency systems, and ongoing operational responsibilities. No Planning Commission recommendation or final action is requested at this meeting. BACKGROUND At its August 18, 2026, meeting, the City Council agreed by consensus to schedule consideration of a data center moratorium following concerns raised about potential impacts from this emerging land use. The September 1 staff report noted that the City had no pending data center applications and that the temporary pause would allow time to develop appropriate standards before applications are submitted. On September 1, 2026, the City Council adopted Resolution No. 12-26, establishing a moratorium on accepting, processing, and approving facilities whose principal use is digital data processing, storage, management, or transmission. The moratorium excludes incidental server equipment supporting another principal use. On September 15, 2026, the Council held the required public hearing to receive community input and consider the moratorium’s findings. The moratorium is scheduled to expire on February 28, 2027, unless ended earlier or otherwise lawfully modified. The purpose of this code development effort is not to prohibit ordinary business information-technology equipment. Instead, it establishes predictable standards for stand-alone or larger-scale facilities whose electrical demand, infrastructure needs, cooling systems, or operational impacts may differ substantially from other commercial and industrial uses. Although the temporary moratorium specifically addresses data centers, the regulatory review has also identified the need for a broader framework to evaluate and manage significant electrical demands October 28, 2026 Planning Commission Regular Meeting 40 2 associated with other types of development. Accordingly, staff is proposing amendments to Chapter 13.10 that would apply to all large power users meeting the established electrical demand threshold, regardless of whether the proposed use is classified as a data center. This approach is intended to provide consistent utility review requirements, protect existing electrical customers, and ensure that infrastructure and power procurement costs associated with new development are appropriately addressed. OVERVIEW OF PROPOSED REGULATIONS Draft Chapter 17.28 consolidates server farms and similar computing facilities under the term “data center,” while distinguishing accessory equipment serving another lawful principal use. The draft establishes three classes, with increasing land use review for larger facilities. Electrical-demand thresholds and treatment of small stand-alone facilities remain subjects for Commission discussion and final technical reconciliation. Table 1: Class Category for Data Center Proposal Classification Electrical Demand/Characteristics Permitted Zoning Required Review Class A – Accessory Data Center Server rooms and accessory IT infrastructure subordinate to an otherwise permitted principal use <1.5 MW. districts, where accessory to a lawful principal electrical permits, as applicable. Class B – Commercial Data Center 1.5 MW – 9.9 MW Commercial and Industrial Zones Conditional Use Permit, Type III Conditional Use Permit when required under subsection C, Building, Electrical Permits, and all other applicable permits and Class C – Industrial Data Center >9.9 MW – 50 MW Industrial Zones Only Permit with Public Hearing, Building, Electrical Permits, and all other applicable permits Other proposed standards include applicant-funded attributable electrical and water improvements; an electrical utility service agreement; safeguards against shifting identifiable project costs to existing ratepayers; power-factor and harmonic-distortion requirements; closed-loop or comparable water-efficient cooling; state and local noise compliance; fire and emergency access requirements; environmental review; monitoring; and decommissioning. The working draft also contemplates a maximum facility demand of 50 MW, subject to confirmation of the intended cap and utility feasibility. In addition to the proposed data center development standards, the draft includes amendments to PAMC Chapter 13.10 establishing utility review and approval requirements for all proposed large power users with anticipated electrical demand of 1.5 MW or greater. These provisions would apply regardless of the proposed land use and would require applicants to obtain approval of their anticipated electrical demand from the City's Electrical Utility through the designated application pathway before submitting applicable development permit applications. October 28, 2026 Planning Commission Regular Meeting 41 3 The proposed amendments are intended to allow the City to evaluate electrical system capacity, infrastructure needs, power procurement requirements, and financial impacts before development proceeds. They would also establish requirements addressing applicant responsibility for attributable infrastructure improvements and utility costs, to protect existing utility customers from costs directly associated with new large-load development. Staff also anticipate corresponding amendments to the City's Master Fee Schedule, PAMC Appendix A, to establish applicable fees and cost-recovery mechanisms associated with the proposed regulations. These updates may include fees for utility capacity evaluations, application and permit reviews, technical studies, inspections, ongoing compliance monitoring, and other administrative or technical services necessary to implement and enforce the regulations. The proposed fee amendments will be developed in coordination with the Electrical Utility, Finance Department, and City Attorney's Office to ensure appropriate cost recovery, transparency, and consistency with applicable legal requirements. Project-specific infrastructure improvements, additional power procurement costs, and other utility obligations may also be addressed through applicable utility rates and service agreements. COMPARISON TO OTHER JURISDICTIONS Table 2. Summary of Washington regulatory approaches identified for comparison. Jurisdiction Regulatory Approach Relevance to Port Angeles Seattle City Light Specialized large-load electrical rates, developer- funded infrastructure, utility service agreements, and and ratepayer protections. Chelan County PUD Quincy Conditional use permits for data centers in certain commercial and industrial zones. Supports discretionary land use review and zoning restrictions. Wenatchee Development standards addressing noise, vibration, screening, building design, and operational impacts. and ongoing operational East Wenatchee Warden Industrial zoning restrictions and electrical utility review requirements. Supports zoning limitations and utility capacity verification. Moses Lake Regulations addressing cryptocurrency mining, server farms, data centers, and electrical consumption. Supports defining and regulating high-energy computing uses. Pierce County Five data center use classifications based on building size, with conditional use permits in certain locations. and graduated permitting Table 3: Comparison of proposed Port Angeles standards with identified Washington precedents. Proposed Port Angeles Standard Comparable Washington Approach Three-class data center classification October 28, 2026 Planning Commission Regular Meeting 42 4 Developer-funded on-site and off-site electrical infrastructure Seattle City Light Seattle City Light and Chelan County PUD Staff reviewed regulatory approaches utilized by other Washington jurisdictions to identify appropriate development standards and permitting requirements for data centers. As illustrated in Tables 2 and 3, jurisdictions have taken varying approaches, including conditional use permits, restrictions on permitted zoning districts, specialized electrical utility rates, developer-funded infrastructure improvements, noise limitations, and ongoing operational monitoring. The proposed Port Angeles ordinance incorporates several of these approaches while adding standards to address the City's unique electrical utility system, limited infrastructure capacity, and responsibility to protect existing and future utility customers. These additional provisions include specific electrical power quality requirements, limitations on total electrical demand, and financial protections related to the City's Bonneville Power Administration (BPA) power supply allocation. While the proposed ordinance generally aligns with regulatory approaches being considered or implemented elsewhere in Washington, certain provisions are specific to Port Angeles. In addition to the land use regulations, the proposed Chapter 13.10 amendments would establish a broader utility review framework applicable to all qualifying large power users. This approach recognizes that significant electrical demand and associated infrastructure costs are not exclusive to data centers and provides a consistent mechanism for evaluating and addressing those impacts across different types of development. KEY QUESTIONS FOR PLANNING COMMISSION DISCUSSION Staff requests feedback on whether the proposed Class A, B, and C classifications appropriately distinguish accessory data center uses from larger stand-alone facilities; whether the proposed commercial and industrial zoning restrictions are appropriate; whether conditional use review provides sufficient opportunity to evaluate community impacts; and whether the proposed standards adequately address water consumption, electrical infrastructure, noise, visual compatibility, and public safety. Staff also welcomes feedback on the proposed 50 MW maximum electrical demand for data centers and the broader Chapter 13.10 amendments that would establish utility review requirements for all large power users with electrical demand of 1.5 MW or greater. Additionally, staff seeks general feedback on the proposed approach to developer-funded infrastructure improvements, utility cost recovery, and corresponding Master Fee Schedule amendments. These discussions are intended to help staff identify policy priorities and areas requiring additional evaluation before the proposed regulations undergo final legal and technical review. October 28, 2026 Planning Commission Regular Meeting 43 5 PROPOSED REVIEW AND ADOPTION SCHEDULE Planning Commission discussion and initial review of draft code. SEPA notice published; comment period begins. Submit 60-day notice of proposed development regulations to the Washington Department of Commerce. November 10, 2026 December 2, 2026 December 15, 2026 December 30, 2026 January 19, 2027 February 28, 2027 NEXT STEPS / REQUESTED ACTION This item is presented for discussion only. Staff requests preliminary Planning Commission feedback on the proposed regulatory framework and associated policy considerations. No formal recommendation or action is requested at this time. Following this discussion, staff will continue coordinating with the City Attorney's Office, Electrical Utility, Finance Department, and other affected departments to review and refine the proposed regulations. This work will include further evaluation of Chapter 17.28, amendments to Chapter 13.10 addressing all large power users, and corresponding Master Fee Schedule updates to establish applicable fees and cost-recovery mechanisms. Staff will also consider feedback from the Utility Advisory Commission, SEPA, and public comments, along with any necessary legal or technical revisions, before returning to the Planning Commission for the proposed December 2, 2026, public hearing. ATTACHMENTS 1.Exhibit A - Draft PAMC Revised Chapter 13.10 Electric Utility and New Chapter 17.28 Data Centers 2. September 1, 2026, City Council Moratorium Staff Memo 3. September 15, 2026, City Council Public Hearing Staff Memo 4. Resolution No. 12-26 October 28, 2026 Planning Commission Regular Meeting 44 Exhibit A 1 CHAPTER 13.10 ELECTRIC UTILITY Only those items noted as follows are being adjusted: deleted, new or changed. All other items remain as is. 13.10.040 Connections. A.Large Power User Electrical Service Approval. Any applicant, property owner, or operator proposing a new or expanded electrical service with an anticipated demand of 1.5 megawatts (MW) or greater shall apply through the City of Port Angeles Electrical Utility’s designated application process and obtain written approval confirming the availability and capacity of electrical service necessary to meet the proposed power demands prior to submitting any associated land use, development, or building permit application. CHAPTER 17.28 DATA CENTERS 17.28.010 Purpose and scope. The purpose of this chapter is to establish standards for the location, development, construction, expansion, and operation of data centers within the City of Port Angeles. These regulations are intended to: A.Support responsible technological investment, economic development, and the continued operation of businesses requiring digital infrastructure. B.Establish a regulatory framework that distinguishes small accessory information technology facilities from commercial and industrial-scale data centers. C.Ensure that data center development is appropriately located and compatible with surrounding land uses, infrastructure capacity, and the City's Comprehensive Plan. D.Protect the reliability, affordability, and long-term sustainability of municipal electrical, water, wastewater, stormwater, and transportation infrastructure. E.Ensure that costs attributable to data center development, including necessary infrastructure improvements, utility capacity expansions, and ongoing utility service, are borne by the applicant and not shifted to existing utility customers to the extent authorized by law. F.Minimize impacts associated with water consumption, electrical demand, noise, air emissions, emergency power generation, stormwater runoff, and other environmental considerations. G.Establish predictable development standards and meaningful public review for data centers of a scale that may substantially affect the community. H.Preserve the City's ability to evaluate cumulative impacts and deny or condition development proposals that cannot adequately mitigate identified impacts. Permits issued under this Chapter are subject to the requirements of PAMC 18.02, Administration of Project Permit Applications and Review Procedures. 17.28.020 Applicability. A.The provisions of this chapter apply to all new data centers and expansions of any existing facilities proposed to include a data center within the City, except as otherwise provided herein. October 28, 2026 Planning Commission Regular Meeting 45 Exhibit A 2 B. Data centers will be classified according to their maximum aggregate electrical demand, proposed operational characteristics, and relationship to the principal use of the property. C. Classification will be based on the total proposed and reasonably foreseeable electrical demand of all phases of development, including associated cooling systems, information technology equipment, and supporting infrastructure. D. Multiple facilities located on contiguous or functionally integrated properties, under common ownership or control, or operating as part of a coordinated development will be evaluated collectively for purposes of determining the applicable class and maximum electrical demand. E. A project will not be divided into separate buildings, parcels, ownership entities, phases, or applications for the purpose of avoiding the requirements of this chapter. F. All data centers must comply with applicable building, electrical, fire, environmental, zoning, utility, and development regulations. 17.28.030 Definitions. For purposes of this chapter, the following definitions apply: A. “Accessory Data Center” means an information technology facility located within or accessory to a principal permitted use, intended primarily to support the operations of the business, institution, government agency, or organization occupying the property. Such facilities are subordinate to the principal use and are not operated primarily as a commercial data hosting or colocation enterprise. B. “BPA Tier 1 Power” means electrical power purchased by the City of Port Angeles from the Bonneville Power Administration (BPA) under the City's applicable power supply agreement at rates associated with the City's Tier 1 allocation. C. “BPA Tier 2 Power” means electrical power purchased by the City of Port Angeles from BPA or other suppliers to meet electrical demand exceeding the City's available Tier 1 power allocation, as determined under applicable power supply agreements, rate schedules, and utility operating requirements. D. “Closed-Loop Cooling System” means a cooling system designed to continuously recirculate cooling water or other cooling fluids through a contained system, with minimal routine consumption, discharge, or replacement of water. Such systems may include dry cooling, liquid-to-liquid heat exchange, or other technologies demonstrated to minimize potable water demand. E. "Data Center" means a building, facility, or portion thereof primarily designed, constructed, or operated to house computer servers, networking equipment, data storage systems, or other information technology infrastructure used for the storage, processing, management, transmission, or distribution of digital information. This term includes, but is not limited to, server farms, data center pods or containers, cloud computing facilities, artificial intelligence computing facilities, colocation facilities, and cryptocurrency mining operations, regardless of ownership or whether services are provided to third parties. Data centers may operate as a principal use or as an accessory use to another lawful principal use subject to the regulations of this chapter and will be classified according to the classes established in PAMC 17.28.040. F. “Electrical Demand” means the maximum aggregate electrical power required to operate a data center, measured in megawatts (MW), including information technology equipment, cooling systems, lighting, electrical losses, and associated operational equipment. Electrical demand will be based on the maximum proposed simultaneous demand, supported by a licensed electrical engineer's analysis and utility verification. G. “Harmonic Distortion” means the degradation of a periodic electrical waveform caused by nonlinear loads that generate voltage or current components at integer multiples (harmonics) of the fundamental October 28, 2026 Planning Commission Regular Meeting 46 Exhibit A 3 frequency, expressed as a percentage and evaluated in accordance with applicable electrical utility standards and recognized engineering methodologies. H. “Contract High Water Mark” or “CHWM” means the amount of Firm Requirements Power (expressed in annual Average Megawatts) that a Port Angeles is eligible to access from BPA at Tier 1 Rates. I. “Megawatt (MW)” means a unit of electrical power equivalent to one million watts. J. “Power Factor” means the ratio of real power (P, in watts or kilowatts) to apparent power (S, in volt- amperes or kilovolt-amperes), used to measure the efficiency with which electrical power is utilized. K. “Power Usage Effectiveness (PUE)” means the ratio of total data center facility energy consumption to the energy consumed by information technology equipment, calculated using a recognized industry methodology. L. “Water Usage Effectiveness (WUE)” means a measure of water consumption associated with data center operations relative to information technology equipment energy consumption, calculated using a recognized industry methodology. 17.28.040 Data Center Classifications and Permitted Locations. Data centers will be classified into three classes as established in Table 17.28.040. All data centers are required to meet all applicable standards in this chapter and the PAMC. Table 17.28.040 Classification Electrical Demand/Characteristics Permitted Zoning Required Review Class A – Accessory Data Center Server rooms and accessory IT infrastructure subordinate to an otherwise permitted principal use where accessory to a lawful principal permits, as applicable. Class B – Commercial Data Center 1.5 MW – 9.9 MW Commercial and Industrial Zones Conditional Use Permit, Type III Conditional Use Permit when required under subsection C, Building, Electrical Permits, and all other applicable permits and Class C – Industrial Data Center >9.9 MW – 50 MW Industrial Zones Only Permit with Public Hearing, Building, Electrical Permits, and all other applicable A. Class A — Accessory Data Centers. 1. Class A facilities will be permitted as accessory uses in any zoning district where the associated principal use is lawfully established. 2. Class A facilities must remain subordinate and incidental to the principal use. 3. Class A facilities must not be operated as independent commercial data centers or colocation facilities. 4. Applicable building, electrical, mechanical, and fire permits must be obtained. 5. A Class A facility will not be subject to the additional utility impact studies or conditional use requirements applicable to Class B and Class C facilities unless its operational characteristics establish that it is functioning as a commercial data center. October 28, 2026 Planning Commission Regular Meeting 47 Exhibit A 4 6. A facility does not qualify as a Class A Accessory Data Center solely based on its electrical demand. To qualify as Class A, the facility must be subordinate and incidental to an otherwise lawful principal use. A facility operated primarily for commercial data processing, hosting, colocation, cryptocurrency mining, or similar independent purposes will be classified as a Class B or Class C data center, as applicable, regardless of whether its electrical demand is below 1.5 MW. B. Class B — Commercial Data Centers. 1. Class B facilities may be permitted in commercial and industrial zoning districts, subject to approval of a Type II Discretionary Conditional Use Permit. 2. Class B facilities will have a maximum aggregate electrical demand of no more than 9.9 MW. 3. Class B facilities will ordinarily be processed through a Type II Discretionary Conditional Use Permit Review Procedure pursuant to PAMC 18.02.250 and this Chapter. 4. Class B facilities must comply with all applicable standards of this chapter, including utility capacity, water conservation, noise, environmental protection, and infrastructure cost recovery. 5. Electrical Utility Approval. Prior to submitting an application for a Type II Discretionary Conditional Use Permit, the applicant, property owner, or operator must apply through the City of Port Angeles Electrical Utility’s designated application process and obtain written approval confirming the availability and capacity of electrical service necessary to meet the proposed data center’s anticipated power demands. C. Class B — Type II Discretionary Conditional Use Review to a Type III Conditional Use Review. A Class B application will be processed as a Type III Conditional Use Permit pursuant to PAMC 18.02.250(D)(2)(i-iv), including a public hearing, when one or more of the following circumstances apply: 1. The project requires construction of a new electrical substation, major transmission infrastructure, or substantial off-site utility improvements that may materially affect surrounding properties. 2. The proposed facility is located within 300 feet of a residential zoning district, school, hospital, or other designated sensitive use. 3. The City's preliminary environmental review identifies potentially significant adverse impacts that require additional quasi-judicial review, to the extent authorized by applicable law. 4. The application proposes an alternative compliance method or modification to any applicable development standard requiring hearing-level review. 5. BPA power and line-and-load studies are approved and costs recovered. D. Class C — Industrial Data Centers. 1. Class C facilities may be permitted only within industrial zoning districts. 2. Class C facilities will have an aggregate maximum electrical demand greater than 9.9 MW, but will not exceed 50 MW. 3. A Type III Conditional Use Permit, including a public hearing, will be required. 4. Class C facilities must demonstrate that the proposed use is compatible with existing and planned industrial development, utility infrastructure, public safety, and the City's Comprehensive Plan. 5. The City may impose conditions necessary to mitigate identified impacts or deny an application when the required approval criteria cannot be satisfied. 6. Electrical Utility Approval. Prior to submitting an application for a Conditional Use Permit, the applicant, property owner, or operator must apply through the City of Port Angeles Electrical Utility’s designated application process and obtain written approval confirming the availability and capacity of electrical service necessary to meet the proposed data center’s anticipated power demands. 7. All BPA power and line-and-load studies identify dedicated power supply, transmission studies are approved, and all costs are recovered. E. Maximum Electrical Demand. No data center facility, campus, or integrated development will be approved or operated with an aggregate electrical demand exceeding 50 MW. The maximum will apply regardless of the number of buildings, parcels, service connections, utility meters, or development October 28, 2026 Planning Commission Regular Meeting 48 Exhibit A 5 phases. Different tiers of power require different studies and measures to identify a dedicated power supply, auxiliary power services, and transmission services identified and approved as required by the Bonneville Power Administration (BPA) or other power and transmission suppliers as may be needed in the future. F. Prohibited Locations. Class B and Class C data centers are prohibited in residential zoning districts and in any zoning district not expressly identified as eligible in Table 17.28.040. 17.28.050 General Development Standards. A. All Class B and Class C data centers must be designed, constructed, and operated to minimize adverse impacts on adjacent properties, public infrastructure, and the natural environment. B. Buildings and associated mechanical and electrical equipment must comply with the dimensional, height, lot coverage, setback, landscaping, and other development standards of the underlying zoning district, except where more restrictive standards are established by this chapter or through conditional use approval. C. All exterior mechanical equipment, cooling systems, backup generators, transformers, and similar infrastructure must be screened from public rights-of-way and adjacent properties to the maximum extent practicable, consistent with operational safety requirements. D. Outdoor storage unrelated to the direct operation of the data center will be prohibited. E. All exterior lighting must be directed downward and shielded to minimize light trespass onto adjacent properties. F. Site design must incorporate landscaping, screening, architectural treatments, and other measures appropriate to the scale of the facility and surrounding development. G. Class B and Class C facilities adjacent to residentially zoned property must provide a minimum 100-foot separation between principal data center buildings and the residential property line, and a minimum 200- foot separation for exterior emergency generators and major cooling equipment, unless an alternative configuration is approved through the Type III process upon demonstration of equal or greater impact mitigation. H. The City may require additional setbacks, landscape buffers, equipment enclosures, or other mitigation measures where necessary to address site-specific impacts. 17.28.60 Electrical Utility Capacity and Cost Responsibility. A. Utility Capacity and Electrical Impact Analysis. Prior to approval of a Class B or Class C Conditional Use Permit, the applicant must submit an electrical demand, infrastructure, and utility impact analysis prepared by a professional electrical engineer licensed in the State of Washington and reviewed and accepted by the City's electrical utility. The analysis must identify: 1. Maximum anticipated electrical demand, projected annual electrical consumption, and proposed development phasing. 2. Existing electrical infrastructure capacity and anticipated constraints. 3. Required substations, transformers, distribution lines, transmission improvements, and other on-site or off-site electrical infrastructure. 4. Potential impacts on system reliability, capacity, power quality, and existing utility customers. 5. Estimated capital costs, ongoing operating expenses, maintenance costs, and potential impacts on the City's electrical utility rates and power supply obligations. 6. Anticipated impacts on the City's Bonneville Power Administration (BPA) Tier 1 power allocation and potential requirements for Tier 2 or other higher-cost power purchases. 7. Proposed strategies for reducing peak electrical demand and improving energy efficiency. October 28, 2026 Planning Commission Regular Meeting 49 Exhibit A 6 8. Anticipated power factor and total harmonic distortion, including proposed equipment and mitigation necessary to maintain compliance with applicable standards. 9. The condition, capacity, and code compliance of electrical infrastructure necessary to serve the proposed development, including any required off-site improvements. 10. Any additional information determined necessary by the City's electrical utility to evaluate the proposed development's impacts on electrical service, infrastructure, rates, or system reliability. 11. Additional information and funding may be required for BPA, or other future suppliers, required power and transmission studies and subject to BPA timelines. B. Applicant Responsibility for Infrastructure Costs. To the maximum extent permitted by applicable law, the applicant will be responsible for the full incremental cost of electrical infrastructure, power, and transmission improvements reasonably attributable to the proposed development, including: 1. The applicant, owner, or operator of a Class B or Class C data center will be responsible for the full cost of all electrical infrastructure improvements necessary to serve the proposed development, to the extent attributable to the development and authorized by applicable law. 2. Such improvements include, but are not limited to, substations, transformers, electrical transmission and distribution lines, poles, conduits, switching equipment, protective devices, metering equipment, system controls, and other necessary infrastructure. 3. The applicant's financial responsibility will extend to all required on-site and off-site infrastructure improvements, including improvements located outside the development property or required elsewhere within the City's electrical utility system as a result of the development. 4. The applicant will also cover all costs for studies or infrastructure required to procure and/or transmit required additional power and auxiliary services to meet power supply and transmission contractual requirements to Port Angeles. 5. Required improvements must be designed, constructed, inspected, and accepted in accordance with applicable City standards, electrical codes, utility requirements, and state and federal regulations. 6. No development is entitled to electrical service until all required infrastructure improvements have been completed, accepted, and financially secured to the satisfaction of the City's electrical utility. 7. The City is not obligated to finance, construct, or subsidize infrastructure improvements necessary to accommodate a Class B or Class C data center, except as otherwise expressly authorized by applicable law. C. Protection of Existing Utility Customers. 1. The development, operation, and expansion of a Class B or Class C data center will not result in project-attributable electrical infrastructure costs, increased wholesale power procurement costs, or other identifiable incremental utility costs being shifted to existing residential, commercial, or industrial utility customers, to the maximum extent permitted by applicable law. 2. The applicant, owner, or operator is responsible for all additional electrical utility costs directly attributable to the development, including increased power procurement costs, infrastructure improvements, system capacity requirements, and other identifiable expenses associated with serving the facility. 3. This responsibility will remain in effect throughout the operational life of the data center and will not terminate upon completion of construction, issuance of a certificate of occupancy, transfer of property ownership, or commencement of operations. 4. Where the City determines through a documented cost-of-service analysis, applicable power supply agreement, or other reasonable utility methodology that the operation of a data center has resulted in increased electrical utility costs, the applicant, owner, or operator will pay such attributable costs through applicable rates, charges, or utility service agreements. 5. The City may require periodic reassessment of project-attributable costs and corresponding adjustments to utility rates, charges, or contractual payment obligations. October 28, 2026 Planning Commission Regular Meeting 50 Exhibit A 7 6. Nothing in this section prohibits the City from implementing otherwise lawful systemwide utility rate adjustments. The intent of this section is to ensure that identifiable costs attributable to data center development are assigned to the responsible development rather than improperly subsidized by other utility customers. D. Mandatory Electrical Utility Service Agreement. Prior to issuance of a building permit or authorization for electrical service, the applicant, owner, or operator of a Class B or Class C data center must execute an electrical utility service and infrastructure agreement acceptable to the City. The agreement must address, at a minimum: 1. Maximum authorized electrical demand and anticipated consumption. 2. Construction and funding of all required on-site and off-site infrastructure improvements. 3. Capacity reservation, service availability, and applicable service limitations. 4. Payment of all applicable connection, capacity, demand, usage, and infrastructure charges. 5. Responsibility for additional power procurement costs attributable to the development. 6. Financial security for infrastructure costs and other lawful financial obligations. 7. Minimum contractual service commitments or other mechanisms to address unused or stranded infrastructure costs, where authorized. 8. Compliance with power factor and harmonic distortion requirements. 9. Infrastructure inspection, maintenance, and repair obligations. 10. Procedures for adjusting rates, charges, or payment obligations when the City's BPA allocation, power procurement costs, or applicable utility contracts change. 11. Continuing financial obligations upon transfer of ownership or operation. 12. Procedures for enforcement, cost recovery, and corrective action. The agreement will remain effective for the duration of electrical service to the facility, subject to applicable law and the terms of the agreement. E. Electrical Rates. Data centers will pay all applicable electrical rates, fees, and charges established under the City's adopted utility regulations and rate schedules. The City may establish a separate rate classification or service agreement for large-load customers where supported by an appropriate cost-of- service analysis and applicable law. F. BPA Tier 1 and Tier 2 Power Cost Allocation. 1. The City will retain the authority to determine the allocation of available BPA Tier 1 power and the assignment of additional power procurement costs in accordance with applicable law, adopted utility rate schedules, and power supply agreements. 2. Class B and Class C data centers will be responsible for the incremental cost of BPA Tier 2 power or other higher-cost electrical supply purchases attributable to their electrical demand, as determined by the City's electrical utility through an adopted rate methodology or enforceable utility service agreement. 3. If the electrical demand from a residential, commercial, industrial, or other development not associated with a data center causes or contributes to the City's need to purchase BPA Tier 2 power or other higher-cost electrical supply, the City will evaluate the incremental costs attributable to the data center's continued electrical demand. 4. The City will establish and maintain a cost allocation methodology for determining incremental wholesale power procurement costs attributable to Class B and Class C data centers, including costs arising from changes in the City's BPA Tier 1 allocation, additional community electrical demand, or other applicable wholesale power supply arrangements. 5. When the City determines, pursuant to its adopted cost allocation methodology and applicable utility service agreement, that a data center is responsible for incremental Tier 2 power or other higher-cost October 28, 2026 Planning Commission Regular Meeting 51 Exhibit A 8 power procurement expenses, the City will provide written notice identifying the applicable charges and their effective date. 6. The applicant, owner, or operator will begin paying such charges within 30 calendar days following written notice, or on the next applicable billing cycle where required by the City's adopted rate schedule or utility service agreement. 7. Such charges will continue for the period established by the City's adopted rate methodology and applicable utility service agreement, subject to periodic adjustment based on actual power procurement costs and attributable electrical demand. 8. Nothing in this section will be interpreted as guaranteeing a data center access to BPA Tier 1 power or limiting the City's authority to establish rates and service conditions necessary to protect existing and future residential, commercial, and industrial utility customers. 9. Reliability. No facility will be approved unless the City determines that the proposed electrical service can be provided without unacceptable impacts to utility system reliability or existing service obligations, after accounting for required improvements. 10. No Guaranteed Capacity. Conditional use approval does not constitute a guarantee of electrical service availability, reserved capacity, or a commitment by the City to construct or finance electrical infrastructure. G. Electrical Capacity and Authority to Deny Development. 1. Approval of a Class B or Class C data center will be contingent upon a determination by the City's electrical utility that sufficient electrical capacity exists or can be provided to serve the proposed development without compromising system reliability, public safety, or the City's ability to meet existing utility service obligations. 2. The City may deny a Conditional Use Permit when sufficient electrical generation supply, transmission capacity, distribution capacity, or related infrastructure is unavailable, and the applicant has not demonstrated that necessary improvements or service arrangements can be feasibly provided. 3. The City may also deny an application where the proposed development would create unacceptable impacts on electrical system reliability, utility operations, or existing service obligations that cannot be adequately mitigated through enforceable conditions or applicant-funded improvements. 4. The City will not be required to expand electrical utility infrastructure, acquire additional wholesale power, or otherwise provide service beyond available or reasonably attainable capacity solely to accommodate a proposed data center. 5. A determination that sufficient capacity is unavailable will be supported by written findings or technical documentation prepared or accepted by the City's electrical utility. H. No Guaranteed Electrical Capacity. Conditional use approval will not constitute a guarantee of electrical service availability, reserved capacity, or a commitment by the City to construct or finance electrical infrastructure. I. Power Factor Requirements. 1. All Class B and Class C data centers must maintain a minimum power factor of 0.95, or 95 percent, at the point of electrical service delivery, or such more stringent standard as may be required by BPA, the City's electrical utility, or applicable power supply agreements. 2. The applicable power factor standard must be maintained during normal facility operations and will be measured in accordance with methods established or approved by the City's electrical utility. 3. The applicant, owner, or operator must install and maintain any power factor correction equipment necessary to achieve and maintain compliance. 4. Any violation of the applicable power factor standard must be corrected immediately upon discovery or notification by the City. Where immediate physical correction is not practicable, the operator must immediately implement interim protective measures approved by the City's electrical utility and complete permanent corrective action within a deadline established by the City. 5. The applicant, owner, or operator is responsible for all applicable fees, penalties, additional power charges, testing expenses, and other recoverable costs resulting from noncompliance, including October 28, 2026 Planning Commission Regular Meeting 52 Exhibit A 9 charges imposed upon the City by BPA or other power suppliers to the extent attributable to the facility. 6. Repeated or continuing violations may result in additional enforcement action, including operational restrictions or suspension of electrical service where authorized by applicable law. J. Total Harmonic Distortion Requirements. 1. All Class B and Class C data centers must be designed, constructed, and operated to maintain total harmonic distortion of three percent (3%) or less at the designated point of electrical measurement, subject to any more stringent applicable City, BPA, or other governing electrical utility standard. 2. Compliance will be evaluated using measurement procedures, monitoring intervals, operating conditions, and technical criteria established by the City's electrical utility and consistent with applicable recognized industry standards, including IEEE Standard 519, as appropriate. 3. The applicant, owner, or operator is responsible for correcting harmonic distortion attributable to the facility and will not be held responsible for distortion originating from the City's electrical system or other customers, except to the extent the facility materially contributes to the violation. 4. Any violation of the applicable harmonic distortion standard must be corrected immediately upon discovery or notification by the City. Where immediate physical correction is not practicable, the operator must immediately implement interim protective measures approved by the City's electrical utility and complete permanent corrective action within a deadline established by the City. 5. The applicant, owner, or operator is responsible for all applicable fees, penalties, testing expenses, infrastructure damage, and other recoverable costs resulting from noncompliance, including charges imposed upon the City by BPA or other power suppliers to the extent attributable to the facility. 6. The City may require additional testing or continuous monitoring where necessary to verify compliance. K. Electrical Infrastructure Condition, Maintenance, and Repair. 1. All electrical transmission lines, distribution lines, transformers, substations, and other electrical infrastructure constructed, installed, modified, or utilized to serve a Class A, Class B, or Class C data center must comply with applicable electrical codes, utility standards, and safety requirements. 2. Electrical infrastructure must be maintained in a safe and good operating condition throughout the operational life of the facility. 3. The applicant, owner, or operator will be responsible for the maintenance, repair, replacement, and correction of electrical infrastructure under its ownership or control and for costs attributable to the facility as established through applicable utility service agreements. 4. Where the City's electrical utility determines that infrastructure serving the facility is deficient, unsafe, or incapable of meeting applicable service requirements, the responsible party will undertake or fund necessary corrective action in accordance with applicable law and the utility service agreement. 5. The applicant, owner, or operator is responsible for the cost of repairing or replacing City-owned infrastructure where the deficiency, damage, or required improvement is directly attributable to the development, its operation, or its failure to comply with applicable electrical requirements. 6. Nothing in this section requires a data center to assume responsibility for preexisting deficiencies or general utility system maintenance unrelated to the development, except where otherwise authorized by law and expressly agreed upon. L. On-Site Generation, Cogeneration, and Self-Supplied Electrical Power. 1. Any Class B or Class C data center proposing to generate electrical power within the City, whether through cogeneration, renewable energy generation, conventional generation, or other methods, will disclose the proposed generation capacity, anticipated use, and interconnection characteristics. October 28, 2026 Planning Commission Regular Meeting 53 Exhibit A 10 2. Electrical power generated and consumed on-site, supplied to affiliated facilities, or otherwise utilized within the City remains subject to all applicable City taxes, utility charges, franchise requirements, and other legally authorized assessments. 3. Where on-site generation or cogeneration results in the displacement of electricity that would otherwise be purchased from the City's electrical utility, the applicant, owner, or operator will pay any applicable utility tax or other legally authorized charge established by the City. 4. The City may establish charges for standby capacity, backup electrical service, interconnection, system availability, and other utility services provided to facilities with on-site generation, where supported by an adopted rate schedule, applicable cost-of-service methodology, and state law. No charge will be imposed solely for the purpose of recovering hypothetical lost utility revenue unless expressly authorized by law. 5. The City may require separate metering, generation reporting, and other reasonable documentation necessary to determine applicable taxes, charges, and utility obligations. 6. Nothing in this subsection authorizes the imposition of a tax or fee not otherwise permitted under Washington State law. M. Continuing Obligations and Changes in Ownership. 1. All electrical infrastructure, power quality, utility cost recovery, and operational requirements established under this section will remain applicable throughout the operational life of a Class B or Class C data center. 2. The applicant, owner, or operator will remain responsible for compliance with applicable utility service agreements, adopted rates, permit conditions, and electrical system requirements. 3. Prior to transfer of ownership or operational control, the City must be notified in writing, and the successor owner or operator must assume all applicable ongoing obligations in accordance with the utility service agreement and applicable law. 4. The City may require updated financial assurances or amendments to utility service agreements when necessary to maintain enforceable financial and operational protections. 5. Failure to comply with continuing obligations constitutes a violation of this chapter and may result in enforcement action as authorized by applicable law. N. Financial Security for Electrical Infrastructure and Power Supply Obligations. 1. Prior to authorization of electrical service, the City may require the applicant, owner, or operator of a Class B or Class C data center to provide financial security sufficient to protect the City against reasonably anticipated financial obligations attributable to the development, including dedicated electrical infrastructure investments, capacity reservation commitments, and wholesale power purchase obligations. 2. Financial security may include an irrevocable letter of credit, performance bond, cash deposit, parent company guarantee, or other instrument acceptable to the City. 3. The amount and duration of financial security will be established based on documented project- specific financial exposure, applicable utility agreements, and the City's adopted utility policies. 4. Financial security must remain in effect for the period during which the City has outstanding financial exposure attributable to the development and may be adjusted periodically to reflect changes in that exposure. 5. The City may require replacement or additional financial security upon a material increase in electrical demand, expansion of the facility, change in ownership, or other circumstances that materially increase the City's financial exposure, consistent with applicable law and the utility service agreement. October 28, 2026 Planning Commission Regular Meeting 54 Exhibit A 11 17.28.070 Water Conservation and Wastewater Management. A. Closed-Loop Cooling Required. All Class B and Class C data centers must utilize closed-loop cooling systems or equivalent technology demonstrated to minimize routine water consumption through continuous recirculation, heat exchange, or other high-efficiency cooling methods. B. Prohibited Cooling Practices. Once-through cooling systems that continuously withdraw and discharge potable or surface water for routine data center cooling are prohibited. C. Water Conservation Plan. Applicants must submit a water conservation and cooling system management plan identifying: 1. Proposed cooling technology and system design. 2. Anticipated average daily, maximum daily, and annual water demand. 3. Estimated makeup water requirements, if applicable. 4. Proposed water recirculation and reuse methods. 5. Anticipated wastewater or process water discharge. 6. Emergency cooling and water supply requirements. 7. Water conservation performance measures and monitoring procedures. D. Water Utility Capacity. The applicant must demonstrate that sufficient water supply, treatment, storage, and distribution capacity exists or can be provided through applicant-funded improvements without adversely affecting existing utility customers or the City's adopted levels of service. E. Applicant Responsibility. The applicant must pay all applicable water and wastewater connection, capacity, infrastructure, and usage charges. The applicant will fund improvements reasonably attributable to the development, subject to applicable utility regulations and state law. F. Water Restrictions. The City may establish enforceable project-specific maximum water consumption limits based on the approved water conservation plan, demonstrated utility capacity, and operational requirements. G. Wastewater Discharge. Process water, cooling system discharge, or other industrial wastewater must comply with all applicable pretreatment, discharge, and environmental requirements. H. Alternative Water Sources. Use of reclaimed water, rainwater harvesting, or other alternative water sources may be considered where legally authorized and technically feasible, provided that such systems meet applicable public health and environmental requirements. I. Prior to approval of a Class B or Class C data center, the applicant must demonstrate that the proposed cooling system minimizes consumptive water use through closed-loop or other approved water-efficient technology. The City may establish maximum daily and annual water consumption limits as conditions of approval based on the facility's approved water conservation plan, available utility capacity, and applicable technical standards. The operator must maintain water use records and demonstrate continuing compliance with approved consumption limits. 17.28.080 Noise, Vibration, and Mechanical Equipment. A. All Class B and Class C facilities must comply with applicable City noise regulations and Washington State noise standards, including Chapter 173-60 WAC, as applicable. October 28, 2026 Planning Commission Regular Meeting 55 Exhibit A 12 B. A data center must not exceed applicable noise limits at receiving properties, including during nighttime operations, equipment testing, and operation of cooling and backup power systems, except where an applicable law expressly provides otherwise. C. Applicants must submit a noise impact assessment prepared by a qualified acoustical professional addressing: 1. Continuous operational noise. 2. Cooling equipment, fans, and mechanical systems. 3. Electrical transformers and substations. 4. Backup generator operation and routine testing. 5. Low-frequency, tonal, and cumulative noise impacts. 6. Sensitive surrounding uses and appropriate mitigation measures. D. Where necessary to achieve compliance, the City may require acoustical enclosures, sound barriers, equipment relocation, additional setbacks, or other noise reduction measures. E. Routine testing of backup generators will be limited to weekdays between 9:00 a.m. and 5:00 p.m., excluding recognized holidays, except where otherwise required by law or necessary for emergency operations. F. Within 30 calendar days following commencement of normal operations, and prior to final approval of any required operational compliance condition, the City may require a post-construction acoustical assessment demonstrating compliance with approved conditions and applicable noise regulations. The City may require additional testing when warranted by documented complaints, equipment modifications, or other evidence of potential noncompliance. G. All Class B and Class C Data Centers must conduct quarterly acoustical assessments to demonstrate ongoing compliance with applicable federal, state, and local noise regulations and all noise-related conditions of approval. Assessments must be conducted by a qualified acoustical professional at the sole expense of the data center owner or operator. 1. Reporting Requirements. Quarterly acoustical assessment reports must be submitted to the City within thirty (30) calendar days following the conclusion of each calendar quarter. Each report will include, at a minimum: a. Noise measurements collected during representative operating conditions, including periods of peak equipment operation; b. Documentation of measurement locations, dates, times, methodologies, equipment, and operating conditions; c. An evaluation of compliance with applicable noise regulations and conditions of approval; d. Identification of any exceedances or violations and associated corrective actions; and e. Certification by the qualified acoustical professional conducting the assessment. 2. Reporting Periods. Quarterly reporting must follow the calendar year as follows: a. a. Quarter 1: January 1 through March 31; b. b. Quarter 2: April 1 through June 30; c. c. Quarter 3: July 1 through September 30; and d. d. Quarter 4: October 1 through December 31. October 28, 2026 Planning Commission Regular Meeting 56 Exhibit A 13 3. Violations and Corrective Action. Upon discovery of any violation of applicable noise regulations or conditions of approval, the data center owner or operator must immediately notify the City and take all necessary measures to eliminate the violation. Any equipment or operations responsible for the violation must cease operation until compliance has been demonstrated to the satisfaction of the City. The City may require additional acoustical assessments, corrective measures, or other actions necessary to verify and maintain compliance. 4. Costs and Enforcement: The data center owner or operator is responsible for all costs associated with required acoustical assessments, monitoring, reporting, corrective actions, and additional studies necessary to demonstrate compliance. Failure to comply with the requirements of this section constitutes a violation of this code and is subject to applicable enforcement provisions, penalties, and remedies authorized by Chapter 2.90 of the Port Angeles Municipal Code. H. If post-occupancy monitoring establishes a violation of applicable noise requirements, the operator must implement corrective measures within a timeframe established by the City. 17.28.090 Emergency Power Generation and Energy Storage. A. Backup generators, battery energy storage systems, fuel storage, and related equipment must comply with all applicable fire, building, electrical, air quality, and environmental regulations. B. The applicant must identify the type, quantity, capacity, location, and anticipated operating characteristics of all emergency power generation equipment. C. Fuel storage systems must incorporate appropriate secondary containment, spill prevention, and emergency response measures. D. Backup power systems must be designed and operated to minimize noise, air emissions, and other impacts on surrounding properties. E. The Fire Marshal may require an emergency response plan addressing fire suppression, battery thermal runaway, hazardous materials, emergency shutdown procedures, and emergency access. F. Use of backup generators for routine commercial power production, energy market participation, or peak-demand management will require separate evaluation and any applicable permits. Approval of a backup generator for emergency service will not automatically authorize nonemergency generation. 17.28.100 Environmental Review and Resource Protection. A. Class B and Class C data centers are subject to the Washington State Environmental Policy Act (SEPA), Chapter 43.21C RCW, and applicable City environmental review procedures, unless categorically exempt. B. Environmental review will evaluate potentially significant impacts associated with: 1. Electrical infrastructure and energy demand. 2. Water consumption and wastewater generation. 3. Noise, vibration, and air emissions. 4. Transportation and construction activities. 5. Stormwater runoff and drainage. 6. Critical areas, shorelines, and other environmentally sensitive resources. 7. Greenhouse gas emissions and energy efficiency, where authorized by applicable law. 8. Cumulative impacts of reasonably foreseeable phases and related development. October 28, 2026 Planning Commission Regular Meeting 57 Exhibit A 14 C. The applicant must demonstrate compliance with the City's critical areas, shoreline, stormwater, floodplain, and other applicable environmental regulations. D. The City may require mitigation measures reasonably related to identified impacts and authorized by applicable law. 17.28.110 Application Requirements. In addition to the standard Conditional Use Permit application requirements, Class B and Class C applications must include: A. A complete site development plan showing buildings, equipment, utility infrastructure, circulation, screening, and proposed development phases. B. A project narrative describing the proposed operations, maximum electrical demand, cooling systems, hours of operation, staffing, and anticipated expansion. C. An electrical demand and infrastructure impact analysis. D. A water conservation and utility capacity analysis. E. A noise impact assessment. F. A preliminary emergency power generation and hazardous materials inventory. G. A preliminary stormwater management plan. H. A description of anticipated construction traffic, heavy equipment deliveries, and transportation impacts. I. An evaluation of potential impacts on surrounding land uses. J. A proposed infrastructure funding and utility service strategy. K. A description of proposed energy efficiency measures, including anticipated PUE and WUE where applicable. L. Any additional technical studies reasonably necessary to determine compliance with the applicable approval criteria. M. An electrical engineering analysis demonstrating the proposed facility's ability to comply with the minimum power factor and maximum total harmonic distortion requirements established in PAMC 17.28.060, including identification of any required power quality correction or mitigation equipment. N. A preliminary electrical utility cost and infrastructure analysis identifying all anticipated on-site and off- site improvements, potential impacts on the City's BPA Tier 1 power allocation, projected higher-cost power procurement requirements, and proposed mechanisms for ensuring that the development bears project-attributable costs. O. A preliminary electrical utility service strategy demonstrating the applicant's ability to satisfy ongoing infrastructure, utility rate, power quality, and financial obligations throughout the operational life of the facility. Appropriately qualified professionals must prepare technical studies. Where professional engineering services are required under state law, such studies must be prepared by an engineer licensed in Washington State. 17.28.120 Conditional Use Permit Approval Criteria. In addition to the applicable Conditional Use Permit criteria established elsewhere in the PAMC and PAMC 18.02.250, a Class B or Class C data center may be approved only upon findings that: A. The proposed use is permitted within the applicable zoning district and is consistent with the City's Comprehensive Plan. October 28, 2026 Planning Commission Regular Meeting 58 Exhibit A 15 B. The development is compatible with surrounding land uses or can be made compatible through enforceable conditions of approval. C. Adequate electrical, water, wastewater, stormwater, transportation, and emergency service infrastructure exists or can be provided through improvements secured by the applicant. D. The development will not create unacceptable impacts on the reliability of municipal utilities or the City's ability to serve existing and reasonably anticipated customers. E. Project-attributable utility infrastructure costs have been appropriately identified and assigned consistent with applicable law. F. The proposed cooling system satisfies the water conservation requirements of this chapter. G. Noise, air quality, lighting, and other operational impacts will comply with applicable regulations. H. Adequate emergency access, fire protection, and hazardous materials safeguards will be provided. I. All required environmental review and mitigation obligations have been satisfied. J. The applicant has demonstrated the ability to comply with the applicable operational requirements and conditions of approval. K. The proposal does not exceed the maximum electrical demand permitted under this chapter. L. The City's electrical utility has determined that sufficient electrical supply and infrastructure capacity exists or can be provided to serve the development without compromising system reliability or existing service obligations. M. The applicant has demonstrated the ability to comply with applicable power factor, harmonic distortion, electrical infrastructure, and ongoing utility service requirements established in PAMC 17.28.060. N. Adequate and legally enforceable mechanisms have been identified to ensure that electrical infrastructure improvements and incremental utility costs attributable to the development are borne by the applicant, owner, or operator and are not improperly shifted to existing utility customers. O. The applicant has demonstrated, through written documentation from the City's electrical utility, that adequate electrical service capacity is available or can feasibly be provided through identified and financially secured improvements. Where the City's electrical utility determines that adequate capacity cannot be provided without unacceptable impacts to existing service obligations, system reliability, or public safety, and such impacts cannot be adequately mitigated, the Conditional Use Permit will be denied. The City may approve, approve with conditions, or deny a Conditional Use Permit based upon the applicable approval criteria and the evidence contained in the record. 17.28.130 Conditions of Approval and Financial Assurances. A. The City may impose reasonable conditions necessary to ensure compliance with this chapter and mitigate identified impacts. B. Conditions may include limitations on maximum electrical demand, water consumption, generator operation, hours of equipment testing, noise levels, construction phasing, and other operational characteristics. C. Prior to issuance of applicable construction permits or utility service authorization, the City may require agreements and financial assurances securing the construction of necessary public improvements and other lawful obligations. D. Financial assurances may include performance bonds, letters of credit, escrow accounts, or other instruments acceptable to the City. October 28, 2026 Planning Commission Regular Meeting 59 Exhibit A 16 E. The amount of financial assurance will be based on a documented estimate of the secured obligation, including appropriate contingency and administrative costs, consistent with applicable law. F. Financial assurances will remain in effect until the secured obligations have been satisfied and accepted by the City. 17.28.140 Operational Monitoring and Reporting. A. Class B and Class C data centers must operate in accordance with the approved Conditional Use Permit and applicable utility agreements. B. The City may require annual reporting of: 1. Maximum electrical demand. 2. Total annual electricity consumption. 3. Annual water consumption. 4. Cooling system performance. 5. Backup generator testing and operational hours. 6. Compliance with applicable noise limits and other permit conditions. C. The City may require additional monitoring where reasonably necessary to verify compliance with an adopted condition of approval. D. Reports containing proprietary operational information will be handled in accordance with the Washington Public Records Act and applicable exemptions. Submission of information to the City will not guarantee confidentiality. E. A material increase in approved electrical demand, water consumption, building area, or operational impacts will require City review and may require modification of the Conditional Use Permit or a new permit. 17.28.150 Expansion, Modification, and Change of Use. A. Expansion of an existing Class A facility that remains accessory to the principal use will be reviewed under applicable building and electrical permit requirements. B. An expansion that causes a facility to exceed the applicable class threshold will require approval under the requirements of the higher class before the expansion may occur. C. Expansion of a Class B or Class C facility will require review of cumulative electrical demand, utility impacts, and operational characteristics. D. Material modifications to an approved facility will require review and approval consistent with the City's applicable land use procedures. E. No expansion or modification will result in an aggregate electrical demand exceeding 50 MW. 17.28.160 Discontinuance, Abandonment, and Decommissioning. A. A Class B or Class C facility that permanently ceases operation will be subject to applicable building, fire, environmental, and nuisance regulations. B. The operator must notify the City when permanent cessation of operations is anticipated. C. Hazardous materials, unused fuel, batteries, and other regulated materials must be removed or secured in accordance with applicable laws. D. Prior to approval of a Class C facility, the City may require a decommissioning plan identifying measures for safe closure, removal of hazardous materials, and stabilization of the site. October 28, 2026 Planning Commission Regular Meeting 60 17 E. Where authorized by law and supported by project-specific findings, the City may require financial security for decommissioning obligations directly related to identified public health, safety, or environmental risks. 17.28.170 Administration and Enforcement. A. The Community and Economic Development Director, or designee, will administer this chapter in coordination with the City's utility departments, Fire Marshal, and other applicable reviewing agencies. B. No building permit, certificate of occupancy, or authorization for utility service will be issued for a Class B or Class C data center unless the applicable land use approval and required conditions have been satisfied. C. Each day a violation of this Chapter occurs or continues constitutes a separate offense and is subject to enforcement and penalties under PAMC 2.90. D. The City may pursue corrective action, penalties, or other remedies authorized by law for failure to comply with approved development or operational requirements. E. Nothing in this chapter limits the City's authority to enforce applicable building, fire, utility, environmental, or public safety regulations. F. Any violation of the electrical power quality, infrastructure maintenance, or utility service requirements established in PAMC 17.28.060 will require immediate action by the responsible applicant, owner, or operator to protect the City's electrical utility system and restore compliance. Where immediate permanent correction is not practicable, the responsible party will implement interim protective measures approved by the City's electrical utility and complete permanent corrective action within the timeframe established by the City. G. The applicant, owner, or operator is responsible for all lawfully imposed fees, penalties, additional power procurement charges, testing expenses, infrastructure repair costs, and other recoverable expenses directly attributable to a violation, including applicable charges assessed against the City by BPA or another power supplier. H. Repeated or continuing violations may result in additional enforcement action, including civil penalties, operational restrictions, suspension of electrical service where authorized by law, or other remedies available under the Port Angeles Municipal Code and applicable state law. 17.28.180 Appeals. Any person aggrieved by the denial or conditioning of a decision described in subsection A of PAMC 14.01.090 may appeal such action pursuant to Article V of PAMC 18.02 to the City’s Hearing Examiner by filing a notice of appeal with the applicable Director as defined in PAMC 18.02.20 and paying the appeal fee set forth in the most current edition of the City’s Master Fee Schedule, PAMC Appendix A. Any appeals of a Type III approval are appealed pursuant to PAMC 18.02.230. October 28, 2026 Planning Commission Regular Meeting 61 Total Engagements YTD:% Change vs Last Year:Avg Daily Engagements YTD:% Timely Responses: Counter Visits = In-person front desk visits. Emails Sent = Messages sent through the permits inbox to applicants. Phone Calls = Customer phone calls logged. Timely Responses = Customer inquiries that receive a response within two business days of the initial contact. The CED Technicians have managed over 6,500 interactions so far this year, with nearly 98% of inquiries responded to within 2 business days. CED Customer Service Report - September 2026 +19.8%6,590 33.1 97.3% 28% 60% 12% Customer Engagement Counter Visits Emails Sent Phone Calls 1259 3845 1486 COUNTER VISITS EMAILS SENT PHONE CALLS Engagement Type –YTD 2026 YTD Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2025 464 553 640 644 730 594 617 571 690 750 526 668 2026 473 542 550 772 703 1087 763 786 786 400 500 600 700 800 900 1000 1100 To t a l I n t e r a c t i o n s Monthly Engagment Trend 0 200 400 600 800 1000 1200 Jan Feb Mar Apr May Jun Jul Aug Sep Timely Response Rate -YTD Total Interactions Timely Responses October 28, 2026 Planning Commission Regular Meeting 62 Total Permits YTD:% Change vs Last Year:% Same-Day Processing YTD:% Timely Issuance YTD: Over-the-Counter permits are completed quickly averaging less than 1 business day from intake to issuance with about 85% processed the same day Same-Day Processing = Measures the time from when an application is received until fees are sent. Counted as “Same-Day” if fees are sent the same business day. Timely Issuance = Measures the time from when payment is received until the permit is issued. Counted as “Timely” if issued within one business day of payment. Note: Customer payment delays are not included in these times. CED Over-the-Counter Permit Report – September 2026 370 +34.5%84.9%96.8% 134 4 3 5 42 61 121 0 20 40 60 80 100 120 140 160 Vendor Inspection Only Fire Solar Plumbing Re-Roof/Re-Side Mechanical Permits by Type -YTD 88% 100% 86%83%83%88%88% 0% 20% 40% 60% 80% 100% Same-Day Processing Rate 17 28 27 28 29 35 32 51 28 27 27 23 27 40 27 31 60 36 54 59 36 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Permits Issued by Month Permits 2025 Permits 2026 0.0 0.2 0.4 0.6 0.8 1.0 1.2 0.6 0.4 0.6 0.9 0.8 0.4 0.7 Average Staff Time by Type (Days) October 28, 2026 Planning Commission Regular Meeting 63 *If we ask for more information about a project and the applicant takes longer than 60 days to respond, the City may add up to 30 extra days to the overall review time for the application, as allowed under Port Angeles Municipal Code (PAMC) 18.02.170(G) and (H). CED SB 5290 Report - Sep 2026 TYPE I - Allowed, Permitted, or Accessory Uses Not Requiring Notice of Application; Building Permits Categorically Exempt from SEPA; Business Licenses; Clearing and Grading Permits; Critical Area Exemptions; Director's Determinations¹; Electrical Permits; Environmentally Sensitive Area Permits and Extensions; Fee Waivers; Final Binding Site Plans; Final Boundary Line Adjustments; Final Overlay Zones; Final Planned Residential Development (PRD); Final Plats; Final Short Plats; Final Unit Lot Subdivisions; Fire Alarm Permits; Fire Permits – Any Other Approval Provided by the Fire Department – Office of the Fire Marshal; Fire Sprinkler Permits; Flood Development Permits; Home Businesses/Home Occupation Permit; Land-Use Verification; Minor Amendments to an Approved Plat, Binding Site Plan, or Planned Residential Development; Minor Deviations Up to 20%; Minor Mobile or Itinerant Vendor Hosting Site Plan Review; NICE Grants; Preliminary Boundary Line Adjustments; Preliminary Short Plats; Regulatory Mobile or Itinerant Vendor Permit; Reasonable Use Exceptions; Right- of-Way Construction Permits; Sales and Use Tax Grants; Shoreline Exemptions; Sign Permits; Short-Term Lodging Licenses; Site Plan Review; Temporary Uses Up to One Year; Utility Feasibility Requests; Wetland Permit Extension; Wetland Temporary Emergency Permit. TYPE II - Administrative Conditional Use Permits; Administrative Conditional Use Permits Required for Transitional Housing Facilities 1–4 Units; Building Permits Requiring SEPA; Cottage Industries; Discretionary Conditional Use Permits; Major Mobile or Itinerant Vendor Hosting Site Plan Review; Minor Plat Amendment; Minor Variances; Preliminary Binding Site Plan; Preliminary Unit Lot Subdivision; SEPA Review (Not Associated with a Public Hearing); Shoreline Substantial Development Permits²; Temporary Housing Facilities; Wetland Permits. TYPE III - Conditional Use Permits; Conditional Use Permits Required for Transitional Housing Facilities 5+ Units; Major Amendments to an Approved Plat or Planned Residential Development; Major Variances; Minor Deviations 21–30%; Plat Vacation; Preliminary Overlay Zones; Preliminary Plats; Preliminary Planned Residential Development (PRD); SEPA Review (Associated with a Public Hearing); Shoreline Conditional Uses; Shoreline Substantial Development Permits³; Shoreline Variances; Temporary Uses – One to Five Years; Unclassified Use – TYPE IV - Site S ecific Rezones. TYPE V - Amendments to Development Regulations; Amendments to the Port Angeles Municipal Code; Annexations; Area-Wide Rezones; Comprehensive Plan Amendments; Development Agreements; Master Land Use, Subarea, Functional, and/or Utility Plans and Amendments; Shoreline Master Program Adoption and Amendments. NOTES: 1. See PAMC 18.02.240 for applicable procedures. 2. Only if the application is for a permitted use and receives a threshold determination of non-significance. 3. Except for Type II shoreline substantial development permits. 14 10 1 0 0 0 2 4 6 8 10 12 14 16 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 Days Nu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type I (65 Day Deadline*) 0 0 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 Days Nu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type II (100 Day Deadline*) 0 0 0 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 Days Nu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type III (170 Day Deadline*) 0 0 0 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 DaysNu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type IV (170 Day Deadline*) 0 0 0 0 0 0 1 2 3 4 5 <14 Days 15-30 Days 31-65 Days 66-100 Days 101-170 DaysNu m b e r o f P e r m i t s I s s u e d Total Number of Days for Permit Review Permit Type V (No Deadline*) October 28, 2026 Planning Commission Regular Meeting 64 CED Affordable Housing Report - September 2026 Type JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2026 YTD 2025 YTD SUT - HB 1406 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SUT - HB 1590 $0.00 $0.00 $0.00 $9,000.00 $91,006.37 $0.00 $0.00 $0.00 $500,000.00 $0.00 $0.00 $0.00 $600,006.37 $50,000.00 FWP $97,226.99 $1,065.00 $31,983.63 $0.00 $35,265.00 $101,704.86 $970.20 $10,646.61 $980.00 $0.00 $0.00 $0.00 $279,842.29 $153,645.15 NICE- Small Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NICE - Medium Scale $0.00 $0.00 $0.00 $21,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $21,000.00 $0.00 NICE - Large Scale $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $46,750.00 TOTAL CITY INVESTMENTS $97,226.99 $1,065.00 $31,983.63 $30,000.00 $126,271.37 $101,704.86 $970.20 $10,646.61 $500,980.00 $0.00 $0.00 $0.00 $900,848.66 $250,395.15 PRP 4 2 2 2 0 1 4 0 2 0 0 0 17 12 MFTE 0 4 4 0 0 0 0 8 0 0 0 0 8 4 Key SUT- HB 1406 SUT- HB 1590 FWP NICE - Small Scale NICE - Medium Scale NICE - Large Scale PRP MFTE Please Note: City staff invest considerable time to proactively engage with prospective housing developers in order to amplify these critical City programs. This report only includes one stage of this important process. Multi Family Tax Exemption. Contracts are shown in the month they were executed between developer and City, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the monthly Building Report. Fee Waiver Program. The costs of 25 permit types are waived by the City for all infill and multifamily housing projects. New Improvements for Community Enhancement of Neighborhoods Projects (≤ $14,999). Grants are shown in the month that the contract was fully executed between the developer and the City. Sales and Use Tax - HB 1406. Grants are shown in the month that the contract was fully executed between the developer and the City. Sales and Use Tax - HB 1590. Grants are shown in the month that the contract was fully executed between the developer and the City. New Improvements for Community Enhancement of Neighborhoods Projects ($15,000-$24,999). Grants are shown in the month that the contract was fully executed between the developer and the City. New Improvements for Community Enhancement of Neighborhoods Projects (≥ $25,000). Grants are shown in the month that the contract was fully executed between the developer and the City. Permit Ready Plans. Plans are shown in the month they were shared with prospective developer, minimum number of estimated new dwelling units listed. Final dwelling unit counts will be determined at permitting/approval phase, and will be detailed on the monthly Building Report. October 28, 2026 Planning Commission Regular Meeting 65 CED Building Report - September 2026 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2025 YTD 0 0 1 0 1 0 1 0 0 0 0 0 4 $0.00 $0.00 $3,000.00 $0.00 $8,268.00 $0.00 $85,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,070,222.00 2 2 6 9 7 6 8 8 12 0 0 0 60 $8,007.00 $11,713.00 $116,130.00 $841,149.00 $151,714.00 $219,289.00 $728,935.00 $275,280.00 $1,001,069.00 $0.00 $0.00 $0.00 $2,460,399.00 Certificate of Occupancy 1 0 0 0 0 0 0 0 0 0 0 0 N/A 1 0 1 1 0 0 1 0 0 0 0 0 0 $7,000,000.00 $0.00 $1,019,685.00 $3,100,000.00 $0.00 $0.00 $186,650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 0 1 0 0 0 0 0 0 0 0 0 2 $0.00 $0.00 $4,500,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,702,099.00 Certificate of Occupancy 0 0 0 0 0 0 0 0 0 0 0 0 N/A 0 0 0 0 0 0 0 0 0 0 0 0 2 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $56,120,000.00 0 0 0 0 0 0 0 0 0 0 0 0 4 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,021,000.00 Certificate of Occupancy 0 0 0 0 0 0 0 0 0 0 0 0 N/A 4 0 2 0 1 4 0 0 0 0 0 0 6 $2,120,000.00 $0.00 $327,936.00 $0.00 $680,190.00 $2,120,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,384,827.00 2 2 0 0 2 0 7 0 0 0 0 0 6 $407,313.00 $130,000.00 $0.00 $0.00 $267,680.00 $0.00 $475,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $884,034.00 1 0 4 0 1 1 0 0 1 0 0 0 12 $224,352.00 $0.00 $515,807.00 $0.00 $400,000.00 $632,337.00 $0.00 $0.00 $412,800.00 $0.00 $0.00 $0.00 $3,698,821.00 1 0 2 1 2 3 3 0 1 0 0 0 8 $170,517.00 $0.00 $86,690.00 $20,000.00 $105,552.00 $577,000.00 $185,000.00 $0.00 $130,000.00 $0.00 $0.00 $0.00 $574,854.00 19 32 18 31 29 32 30 28 27 0 0 0 278 $251,345.00 $322,685.00 $201,849.00 $557,995.00 $753,323.00 $508,882.00 $513,627.00 $468,045.00 $634,053.00 $0.00 $0.00 $0.00 $4,547,901.00 Certificate of Occupancy 2 0 0 0 0 0 2 3 0 0 0 0 N/A Comm 0 0 2 0 1 0 4 0 0 0 0 0 6 Res $0.00 $0.00 $15,200.00 $0.00 $7,734.00 $0.00 $15,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $85,880.00 30 36 37 42 44 46 56 39 41 0 0 0 388 $10,181,534.00 $464,398.00 $6,786,297.00 $4,519,144.00 $2,374,461.00 $4,057,508.00 $2,189,212.00 $743,325.00 $2,177,922.00 $0.00 $0.00 $0.00 $74,550,037.00 $106,793.40 $20,095.63 $100,441.68 $89,033.73 $44,118.65 $62,333.96 $51,832.20 $18,546.35 $58,702.12 $0.00 $0.00 $0.00 $926,388.56 3 2 4 2 4 2 1 1 1 0 0 0 23 0 0 1 0 1 2 0 0 1 0 0 0 5 2 4 8 0 4 0 2 8 0 0 0 0 0 0 22 2 12 1 0 4 0 1 1 0 0 1 0 0 0 8 0 12 2 2 0 0 2 0 7 0 0 0 0 0 13 4 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 2 9 0 6 11 7 0 2 0 0 0 48 8 34 20 Demolition and Moving Repair and Alteration 246 $4,211,804.00 $551,897.72 $33,493,801.00 7 $37,934.00 371 13 $1,274,759.00 7 $0.00 0 0 $0.00 11 $5,248,126.00 13 $1,279,993.00 8 $2,185,296.00 4 $11,306,335.00 0 0 $4,500,000.00 1 2026 YTD 3 $96,268.00 1 60 $3,353,286.00 italics are at various stages of staff review. Additionally, not all applicants have submitted a complete application at this time. While we expect the majority to advance through the review process, it is possible that some may experience the need for additional review. Total Dwelling Units New Single Family New Accessory Structure Res Dwelling Units - Duplex New Construction New Multi Family New Manufactured Home Business Certificate of Occupancy Permit Fees Paid Total Permits Issued Total Construction Valuation Repair and Alteration Comm Ind Public New Construction New Construction Repair and Alteration Repair and Alteration October 28, 2026 Planning Commission Regular Meeting 66 CED Business License Report - Q3 2026 * Deliquent Licensees: All records are being reviewed to confirm whether a business is still operating in the city, has relocated, or simply failed to renew with the Washington State Department of Revenue. Local businesses operating without a valid business license will receive 30, 60, 90-day, warning and fine notices from the City. Program Effective Date: The City's Business License Program was launched Q3 of 2025. Businesses operating in Port Angeles City Limits were not previously required to obtain a Port Angeles Endorsement on their Washington State Business License. ** Number of employees: This data is voluntary and not required in order to receive a business license. Information obtained by the City has been self-reported and is not necessarily representative of all licensed businesses in Port Angeles. *** Licenses Issued by Industry: North American Industry Classification System (NAICS) codes are voluntarily reported. Information obtained by the City has been self-reported and is not necessarily representative of all licensed businesses in Port Angeles. General Business Licenses Issued - Q3 2026 267 Year to Date All Licenses 874 Non-Profit Licenses Issued - Q3 2026 12 17 0 5 34 7 15 28 2 10 29 8 5 26 7 12 0 50 100 150 200 250 300 350 400 Q1 General Business Q1 Non- Profit Q2 General Business Q2 Non- Profit Q3 General Business Q3 Non- Profit Q4 General Business Q4 Non- Profit Licenses Issued by Quarter - Q3 2026* 2025 2026 2 3 3 6 6 6 7 14 17 18 23 25 26 28 35 60 0 10 20 30 40 50 60 70 Finance and Insurance Educational Services Wholesale Trade Transportation and Warehousing Agriculture, Forestry, Fishing and Hunting Manufacturing Information Arts, Entertainment, and Recreation Real Estate and Rental and Leasing Accommodation and Food Services Health Care and Social Assistance Other Services Administrative & Support / Waste Management Professional, Scientific, and Technical Services Retail Trade Construction Licensed Issued by Industry - Q3 2026*** 1-5 employees, 83% 6-10 employees, 5% 11-20 employees, 3% 21 or more employees, 9% Licensed Businesses by Number of Employees - Q3 2026** 50 62 30 25 16 0 10 20 30 40 50 60 70 30-Day Notices 60-Day Notices 90-Day Notices Warning Notices Fine Notices Delinquent License Notices by Quarter - Q3 2026* October 28, 2026 Planning Commission Regular Meeting 67 2026 Q3 CED Grant Report October 28, 2026 Planning Commission Regular Meeting 68 1 CED Grant Report 2026 Q3 ACTIVE GRANTS Parking and Business Improvement Area (PBIA) & Port Angeles Waterfront District (PAWD) Grant: $16,402.52 distributed YTD Source: PBIA Funds Contract Number: N/A Partners: Port Angeles Waterfront District Status: Three-year contract approved by City Council on December 3rd, 2024. Contract executed on December 17th, 2024, and valid through December 31, 2027. Contractor: N/A Q3 Deliverables: • PAWD reporting for Q3 demonstrated the following: o Strategic Planning & Communications: Continued implementation of the ELEVATE PA 5-Year Strategic Action Plan through regular communications, community calendar management, and quarterly reporting. o Business Support & Advocacy: Maintained regular communication with Waterfront District businesses, identifying key needs including affordable financing, parking, public safety, blighted properties, and stalled development projects. Advocated for businesses through City meetings, public comments, and stakeholder committees. o Economic Development: Supported business attraction and retention efforts, including conference and convention recruitment. Several new businesses opened or expanded, while additional businesses are preparing to open in the District. o Public Space & Community Engagement: Hosted public meetings focused on street conditions, space activation, and positive guardianship. Successfully piloted a community activation at Pebble Beach Park and began development of future ambassador/street greeter programs. o Events & District Vibrancy: Supported major community events including the July 4th celebration and parade, mural festival, Arts in Action, and other seasonal activities. Volunteers completed 12 downtown work parties. October 28, 2026 Planning Commission Regular Meeting 69 2 o Beautification: Completed a District Beautification Plan outlining responsibilities and priorities for improving public spaces, seasonal decorations, planters, banners, and other beautification efforts. o Vacancy & Property Revitalization: Conducted and published the first Vibrancy Survey, which demonstrated strong community concern about vacant/blighted properties and support for action. Continued advocacy for strategies to address vacancies. o Partnerships & Public Safety: Maintained collaboration with the City of Port Angeles Police Department, Port Angeles Regional Chamber of Commerce, Port Angeles Business Association, Clallam County Economic Development Council, and other community partners. Continued support of the Downtown Neighborhood Watch and explored additional positive-guardianship strategies. o Transparency & Community Participation: Held three public ELEVATE PA meetings and five committee meetings, providing accessible opportunities for residents and businesses to participate in District activities and planning. o 2027 Readiness: Successfully re-enrolled in the Washington Main Street Program, with official designation beginning January 1, 2027. Continued preparation for the Main Street Tax Credit Incentive Program and potential PBIA expansion. Department of Commerce: Urban Forestry Program Grant: $109,000 Source: Washington Department of Commerce; Climate Commitment Act Contract Number: 26-63117-005 Partners: WA Department of Commerce Status: Contract period is July 1, 2025 – June 30, 2027. Contractor: The City will be responsible for providing all but one of the deliverables under the grant agreement. AKS Engineering & Forestry was selected to conduct an Urban Tree Canopy Assessment and Stream Assessment that will be used to develop the Urban Forestry Management Plan. Q3 Deliverables: • An Urban Forestry Tiger Team has continued to work together to meet the deliverables of the grant which are also in alignment with the updates to the Critical Areas Ordinance. October 28, 2026 Planning Commission Regular Meeting 70 3 • AKS Engineering & Forestry has been working on completing the Urban Forest Tree Canopy & Stream Assessment, which is currently being reviewed by staff. These assessments will assist staff with developing the Urban Forest Management Plan in the coming months. • AKS performed a ground-truthing field day where staff from CED, Public Works & Utilities, and Parks & Recreation were invited to learn about the methodologies used for performing the stream assessments. These tools can be applied internally should the need arise for future assessments. Pre-Development Technical Assistance – Multifamily Housing Pipeline Project Grant: $1,988,500 Source: Washington Department of Commerce; Housing Trust Fund Contract Number: 25-94110-003 Partners: A development partner will be selected by Q3 of 2027. Status: Contract period is February 19, 2026 - June 30, 2027 Contractor: Dialog – Design Services Only Q3 Deliverables: • On July 29, 2026, the City convened a collaborative workshop for Project 935, bringing together approximately 42 participants representing the City, local developers and builders, housing and financial institutions, community organizations, industry associations, and the consultant team. Key outcomes of the workshop included an emphasis on practical transformation: creating housing and community amenity that is affordable to build, affordable to live in, simple to replicate, and flexible enough to adapt across sites, market conditions, construction capacity, and changing code requirements. October 28, 2026 Planning Commission Regular Meeting 71 4 • On September 3, 2026, the Consultants provided the City with three design alternatives for Project 935 varying in unit numbers, size, amounts of parking, building modulation, green spaces, and amenities. • Using the vision, success criteria, and feedback from the Project 935 Design Workshop, which included community stakeholders, City staff reached a consensus-based decision to recommend moving forward with Study 2.1. The selected building design provides 24 units, four stories, and 3,500 square feet of commercial space. Clallam County Economic Development Council Grant: $20,000 Source: General Fund Contract Number: N/A Partners: Clallam County Economic Development Council Status: Contract period is January 1st, 2026 – December 31st, 2026 Contractor: N/A Q3 Deliverables: • Clallam Economic Alliance continued to meet, establishing its legislative agenda for the 2027 WA State legislative session. Key priorities include improving US 101 freight mobility and transportation infrastructure, securing capital funding for the Hollywood Beach seaplane project, expanding the Port Angeles Composites building, and protecting Peninsula College from further budget reductions. • Continued to support efforts for repurposing McKinley Mill, including facilitating tribal and agency engagement, and advancing due diligence work essential to the Asset Purchase Agreement. • Initiated two (2) new business contacts; one for marine technology and one for hospitality/bakery. • Provided business retention and expansion support to 15 different businesses including residential remodelers, landscaping, marketing, engineering services, construction, forest products, and more. • Provided startup assistance to three (3) new businesses including pet care, construction, and home health care. • Continued to offer training and workshops with various partners, including the Opportunity Zone 2.0, Small Business Innovation Research (SBIR) Program, Business Health Trust, and Emergency Management Training that resulted in assistance to over 20 local businesses. October 28, 2026 Planning Commission Regular Meeting 72 5 Accelerating Procurement Excellence (APEX) Accelerator Grant: $10,000 Source: General Fund Contract Number: N/A Partners: Accelerating Procurement Excellence (APEX) Accelerator Status: Contract period is January 1st, 2026 – December 31st, 2026 Contractor: N/A Q3 Deliverables: • Hosted five (5) training events to include a successful Federal Meet the Agencies event with 27 local businesses in attendance. • Provided 92 hours of one-on-one counseling, supporting 13 local businesses. • Assisted four (4) new small businesses to be government contracting-ready. • Assisted two (2) businesses with achieving new certifications. • Federal government awarded dollars to local businesses: $3,116,499.80 Lodging Tax Annual Fund Allocation Grants: $1,836,045 Source: Loding Tax Funds Contract Number: N/A Partners: Please see the ‘Q3 Deliverables’ section below. Status: All round one and round two awardees have received their contracts and invoices have been received from numerous recipients. The CED team continually disburse funds as reimbursement requests come in. Contractor: Lodging Tax funds are used to support the following annual contracts and expenses: • Port Angeles Regional Chamber of Commerce – Visitor Center Operations: $142,342 • Wander Fuca – Destination Marketing Campaign: $266,000 • City of Port Angeles ROW Coverage Costs – NTE $10,000 • City of Port Angeles Expenses for LTAX Related Work – $55,824 Q3 Deliverables: Organization Name Amount Reimbursed Port Angeles Regional Chamber of Commerce $71,511.87 October 28, 2026 Planning Commission Regular Meeting 73 6 Wander Fuca $50,950.00 Lincoln Park BMX Association $6,307.13 Port Angeles Fine Arts Center $57,407.22 Concerts on the Pier $10,500.00 Olympic Peninsula Tourism Commission $20,024.65 Feiro Marine Life Center $2,100.00 GOPA LLC $15,000.00 Juan de Fuca Foundation for the Arts $24,825.00 Port Angeles Salmon Club $10,000.00 Music on the Strait $9,102.64 Total Amount Reimbursed in Q3: $277,728.51 Affordable Housing Programs Grants: $900,848.66 YTD Source: Sales and Use Tax funds, Fee Waivers, and NICE funds. Contract Number: N/A Partners: Please see the ‘Q3 Deliverables’ section below. Contractor: N/A Q3 Deliverables: Fee Waiver Program Grants • The City waived $12,596.81 in building, land use, fire, engineering, and public works fees for three eligible residential projects. Sales and Use Tax Funds • $500,000 SET 1590 grant to Peninsula Housing Authority’s Francis Ridge senior housing development. Francis Ridge will be located behind the Boys and Girls Club and will provide 62 units of housing to senior with set asides for veterans and formerly homeless individuals. NICE Neighborhood Funds • No NICE funds were awarded in Q3. Façade Grant Program Grants: $16,226.50 YTD October 28, 2026 Planning Commission Regular Meeting 74 7 Source: $40,726.15 CDBG program income funds. Contract Number: N/A Partners: Please see the ‘Q3 Deliverables’ section below. Contractor: N/A Q3 Deliverables: • Clallam County Genealogical Society applied for a Façade Improvement Grant at their building located at 403 E 8th St. The application was approved by the Planning Commission at the May 27th meeting in the amount of $10,000. The muralist has been making good progress towards the improvements to the façade. • Studio Bob and Sound Bikes and Kayaks applied for a Façade Improvement Grant for the building located at 118 ½ E Front St. The application was approved by the Planning Commission at the August 26th meeting in the amount of $6,226.50 for the restoration and enhancement of the art deco features of the original façade. CLOSED GRANTS None to report for Q3. October 28, 2026 Planning Commission Regular Meeting 75 Wednesday, October 28, 2026 | Slide 1Department of Community & Economic DevelopmentCity of Port Angeles | Department of Community & Economic Development Sign Grant 26-0003 Sound Bikes & Kayaks and 26-0004 Studio Bob 120 E Front St and 118 ½ E Front St Planning Commission Sign Grant Presentation October 28th, 2026 Presented by: Courtney Bornsworth, Natural Resources & Grant Administrator Wednesday, October 28, 2026 | Slide 2Department of Community & Economic Development Location: Location Wednesday, October 28, 2026 | Slide 3Department of Community & Economic Development Façade Grant Request Details FSG 26-0003 Sign Development •Restoration Labor None requested •Restoration Materials Estimated $1,863.36 Total Eligible Sign Cost: $1,863.36 Sign Grant Request: $931.68 FSG 26-0004 Sign Development •Restoration Labor None requested •Restoration Materials Estimated $1,301.00 Total Eligible Sign Cost: $1,301.00 Sign Grant Request: $650.50 Wednesday, October 28, 2026 | Slide 4Department of Community & Economic Development Current State Wednesday, October 28, 2026 | Slide 5Department of Community & Economic Development Proposed Improvements Wednesday, October 28, 2026 | Slide 6Department of Community & Economic Development 1.Staff recommends the approval of funding for Sign Grant 26-0003, citing 7 Findings, 3 Conclusions, and 7 Conditions in the Staff Report. 2.Staff recommends the approval of funding for Sign Grant 26-0004, citing 7 Findings, 3 Conclusions, and 7 Conditions in the Staff Report. October 28, 2026CITY OF PORT ANGELES 1 Preliminary Discussion MCA 26-00286 Proposed Data Center and Large Power User Regulations Agenda •Background •Summary •Overview of Proposed Regulations •Comparison to Other Jurisdictions •Key Questions for Planning Commission Discussion •Proposed Review and Adoption Schedule •Next Steps October 28, 2026CITY OF PORT ANGELES 2 Background •September 1, 2026: City Council adopted a temporary data center moratorium under Resolution No. 12-26. •September 15, 2026: City Council held the required public hearing to receive community input and consider the moratorium’s findings. • February 28, 2027: Moratorium expires. •Goal: Establish standards before applications arrive. October 28, 2026CITY OF PORT ANGELES 3 Summary •The proposed regulations are preliminary, have not yet been reviewed by the City Attorney's Office, and are being presented primarily to initiate discussion and receive policy direction from the Planning Commission. •The draft is subject to further legal review, technical evaluation, and revisions before formal consideration for adoption. •The proposed framework classifies data centers by facility use and electrical demand, identifies appropriate zoning districts, and addresses electrical utility capacity, infrastructure funding, water use, noise, and ongoing operational responsibilities. •No Planning Commission recommendation or final action is requested at this meeting. October 28, 2026CITY OF PORT ANGELES 4 Overview of Proposed Regulations •The proposed regulations include a new Port Angeles Municipal Code (PAMC) Chapter 17.28, Data Centers, and amendments to Chapter 13.10 to establish electrical utility requirements for all large power users. •The proposed framework classifies data centers by facility use and electrical demand, identifies appropriate zoning districts, and addresses electrical utility capacity, infrastructure funding, water use, noise, and ongoing operational responsibilities. •Corresponding amendments to the City's Master Fee Schedule will also be developed to address applicable fees and cost recovery associated with implementing and administering these regulations. October 28, 2026CITY OF PORT ANGELES 5 Overview of Proposed Regulations Continued •Although the temporary moratorium specifically addresses data centers, the regulatory review has also identified the need for a broader framework to evaluate and manage significant electrical demands associated with other types of development. •Amendments to Chapter 13.10 would apply to all large power users meeting the established electrical demand threshold, regardless of whether the proposed use is classified as a data center. •Intended to provide consistent utility review requirements, protect existing electrical customers, and ensure that infrastructure and power procurement costs associated with new development are appropriately addressed. October 28, 2026CITY OF PORT ANGELES 6 Title 18.02 Project Permit Application Types October 28, 2026CITY OF PORT ANGELES 7 Overview of Proposed Regulations Continued Classification Electrical Demand/Characteristics Permitted Zoning Required Review Class A – Accessory Data Center Server rooms and accessory IT infrastructure subordinate to an otherwise permitted principal use <1.5 MW. All zoning districts, where accessory to a lawful principal use Type I Building and electrical permits, as applicable. Class B – Commercial Data Center 1.5 MW – 9.9 MW Commercial and Industrial Zones Type II Discretionary Conditional Use Permit, Type III Conditional Use Permit when required under subsection C, Building, Electrical Permits, and all other applicable permits and studies. Class C – Industrial Data Center >9.9 MW – 50 MW Industrial Zones Only Type III Conditional Use Permit with Public Hearing, Building, Electrical Permits, and all other applicable permits and studies. October 28, 2026CITY OF PORT ANGELES 8 What is a Megawatt of Power? October 28, 2026CITY OF PORT ANGELES 9 Overview of Proposed Regulations Continued •Proposed safeguards to prevent unauthorized expansion of facilities that try to avoid the requirements of the proposed code. •Although the temporary moratorium specifically addresses data centers, the regulatory review has also identified the need for a broader framework to evaluate and manage significant electrical demands associated with other types of development. October 28, 2026CITY OF PORT ANGELES 10 Overview of Proposed Regulations Continued •Amendments to Chapter 13.10 would apply to all large power users meeting the established electrical demand threshold, regardless of whether the proposed use is classified as a data center. •Intended to provide consistent utility review requirements, protect existing electrical customers, and ensure that infrastructure and power procurement costs associated with new development are appropriately addressed. October 28, 2026CITY OF PORT ANGELES 11 Overview of Proposed Regulations - Electrical •Applicant-funded attributable electrical improvements. •An electrical utility service agreement to ensure all requirements are met. •Several safeguards against shifting identifiable project costs to existing ratepayers. October 28, 2026CITY OF PORT ANGELES 12 Overview of Proposed Regulations – Electrical Continued •Power-factor and harmonic-distortion requirements. •The working draft also contemplates a maximum facility demand of 50 MW, subject to confirmation of the intended cap and utility feasibility. •In addition to the proposed data center development standards, the draft includes amendments to PAMC Chapter 13.10 establishing utility review and approval requirements for all proposed large power users with anticipated electrical demand of 1.5 MW or greater. October 28, 2026CITY OF PORT ANGELES 13 Overview of Proposed Regulations - Water •Closed-loop or comparable water-efficient cooling required. •Applicant-funded attributable water improvements. •Prohibited Cooling Practices. Once-through cooling systems that continuously withdraw and discharge potable or surface water for routine data center cooling are prohibited. •Applicants must submit a water conservation and cooling system management plan. October 28, 2026CITY OF PORT ANGELES 14 Overview of Proposed Regulations – Water Continued •Applicants must demonstrate that sufficient water supply, treatment, storage, and distribution capacity exists or can be provided through applicant-funded improvements without adversely affecting existing utility customers or the City's adopted levels of service. •Process water, cooling system discharge, or other industrial wastewater must comply with all applicable pretreatment, discharge, and environmental requirements. October 28, 2026CITY OF PORT ANGELES 15 Overview of Proposed Regulations - Noise •Must comply with applicable City noise regulations and Washington State noise standards, including Chapter 173-60 WAC. •Applicants must submit a noise impact assessment prepared by a qualified acoustical professional. •Where necessary to achieve compliance, the City may require acoustical enclosures, sound barriers, equipment relocation, additional setbacks, or other noise reduction measures. October 28, 2026CITY OF PORT ANGELES 16 Overview of Proposed Regulations – Noise Continued •Quarterly acoustical assessment reports must be submitted to the City within thirty (30) calendar days following the conclusion of each calendar quarter. •The data center owner or operator is responsible for all costs associated with required acoustical assessments, monitoring, reporting, corrective actions, and additional studies necessary to demonstrate compliance. October 28, 2026CITY OF PORT ANGELES 17 Overview of Proposed Regulations – Environment Protection •Subject to the Washington State Environmental Policy Act (SEPA), Chapter 43.21C RCW, and applicable City environmental, shoreline, and all other applicable regulations. •The applicant must demonstrate compliance with the City's critical areas, shoreline, stormwater, floodplain, and other applicable environmental regulations. October 28, 2026CITY OF PORT ANGELES 18 Comparison to Other Jurisdictions in WA State October 28, 2026CITY OF PORT ANGELES 19 Jurisdiction Regulatory Approach Relevance to Port Angeles Seattle City Light Specialized large-load electrical rates, developer-funded infrastructure, utility service agreements, and power demand management. Supports electrical cost recovery and ratepayer protections. Chelan County PUD Data center rate schedules with demand charges, energy charges, and upfront infrastructure costs. Supports separate electrical rates for large-load customers. Quincy Conditional use permits for data centers in certain commercial and industrial zones.and zoning restrictions. Wenatchee Development standards addressing noise, vibration, screening, building design, and operational impacts. Supports development standards and ongoing operational compliance. Comparison to Other Jurisdictions in WA State Continued October 28, 2026CITY OF PORT ANGELES 20 Jurisdiction Regulatory Approach Relevance to Port Angeles East Wenatchee Noise regulations requiring post-operational testing and compliance documentation.operations begin. Warden Industrial zoning restrictions and electrical utility review requirements. Supports zoning limitations and utility capacity verification. Moses Lake Regulations addressing cryptocurrency mining, server farms, data centers, and electrical consumption. Supports defining and regulating high- energy computing uses. Pierce County Five data center use classifications based on building size, with conditional use permits in certain locations. Supports tiered classifications and graduated permitting requirements. Proposed Port Angeles Regulations in Comparison to Other Jurisdictions in WA October 28, 2026CITY OF PORT ANGELES 21 Proposed Port Angeles Standard Comparable Washington Approach Three-class data center classification Pierce County uses multiple classifications based on facility size. Conditional use permits for larger facilities Quincy and Pierce County Developer-funded on-site and off-site electrical infrastructure Seattle City Light Protection against increased electrical costs to existing ratepayers Seattle City Light and Chelan County PUD Proposed Port Angeles Regulations in Comparison to Other Jurisdictions in WA Continued October 28, 2026CITY OF PORT ANGELES 22 Proposed Port Angeles Standard Comparable Washington Approach Electrical capacity verification and ability to deny inadequate service Seattle City Light and Warden provide related utility precedents. Mandatory noise standards Wenatchee and East Wenatchee Post-construction noise testing East Wenatchee Continuing responsibility for attributable utility cost increases Seattle City Light has related contractual protections, but not an identical requirement. Key Questions for Planning Commission 1.Are the proposed commercial and industrial zoning restrictions are appropriate? 2.Do the proposed Class A, B, and C classifications appropriately distinguish accessory data center uses from larger stand- alone facilities? October 28, 2026CITY OF PORT ANGELES 23 Key Questions for Planning Commission 3.Does the conditional use review provide sufficient opportunity to evaluate community impacts? 4.Do the proposed standards adequately address water consumption, electrical infrastructure, noise, visual compatibility, and public safety? October 28, 2026CITY OF PORT ANGELES 24 Key Questions for Planning Commission 5.What feedback does the Commission have on the proposed 50 MW maximum electrical demand for data centers and the broader Chapter 13.10 amendments that would establish utility review requirements for all large power users with electrical demand of 1.5 MW or greater? 6.What feedback does the Commission have on the proposed approach to developer-funded infrastructure improvements and utility cost recovery? October 28, 2026CITY OF PORT ANGELES 25 Proposed Review and Public Participation Plan Schedule Date Milestone/Action October 28, 2026 Planning Commission discussion and initial review of draft code. October 28, 2026 SEPA notice published; comment period begins. By October 28, 2026 Submit 60-day notice of proposed development regulations to the Washington Department of Commerce. November 10, 2026 Utility Advisory Commission meeting. December 2, 2026 Special Planning Commission meeting and public hearing; anticipated recommendation. December 15, 2026 City Council first reading. December 30, 2026 60-day pre-expiration deadline identified for bringing an item back to Council. January 19, 2027 City Council second reading / anticipated adoption. February 28, 2027 Current moratorium expiration. October 28, 2026CITY OF PORT ANGELES 26 Next Steps •This item is presented for discussion only. •Staff requests preliminary Planning Commission feedback on the proposed regulatory framework and associated policy considerations. •No formal recommendation or action is requested at this time. •Following this discussion, staff will continue coordinating with the City Attorney's Office, Electrical Utility, Finance Department, and other affected departments to review and refine the proposed regulations. •Staff will also consider feedback from the Utility Advisory Commission, SEPA, and public comments, along with any necessary legal or technical revisions. October 28, 2026CITY OF PORT ANGELES 27 Thank you - Questions October 28, 2026CITY OF PORT ANGELES 28