Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
11042026 CC Agenda Packet
Wednesday November 4, 2026 Port Angeles City Council Meeting Page 1 November 4, 2026 City of Port Angeles Council Meeting Agenda This meeting will be conducted as a hybrid meeting. In hybrid meetings, members of the public, Council members, and City sta ff have the option to attend the meeting in person, in Council chambers at City Hall located at 321 East 5 th Street, Port Angeles, or remotely via telephone or video link. The Mayor may determine the order of business for a particular City Council meeting. The agenda should be arranged to best serve the needs and/or convenience of the Council and the public. The Mayor will determine time of break. Hearing devices are available for those needing assistance. The items of business for regular Council meetings may include the following: A. Call to Order – Special Meeting at 5:30 p.m. – The purpose of the special meeting is for City Council to hold a Closed Session under authority of RCW 42.30.140(4), to discuss collective bargaining with an employee organization . . Call to Order – Regular Meeting at 6:00 p.m. B. Roll Call, Pledge of Allegiance Ceremonial Matters, Proclamations & Employee Recognitions 1. Proclamation in Recognition of Veteran’s Day C. Late Items To be placed on this or future agendas, including any executive session needed during or at the end of the meeting. D. Public Comment The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an or derly and timely manner. Visit https://www.cityofpa.us/Live-Virtual-Meetings to learn how to participate during public comment and or watch the meeting live. Written public comments can be submitted to: council@cityofpa.us, comments will not be read aloud. Audio only: 1-844-992-4726 Access code (webinar number): 2554 980 0346 Webinar password: 35fYarYcX3Y (35392792 when dialing from a phone or video system) Once connected, press *3 to raise your virtual hand if you wish to make a comment or public testimony. Webex link: https://cityofpa.webex.com/cityofpa/j.php?MTID=mbcde240c16cdf551b7b1d6219c8715da To make a public comment, please use the “raise your hand” feature in Webex. You will be notified when it is your turn to speak. These access codes are good for the November 4, 2026 meeting only. Members of the public may address the City Council at the beginning and end of any Regular Meeting under "Public Comment." During the "Public Comment" portion of the meeting, individuals may speak to agenda items, except those scheduled for a Publi c Hearing. The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an orderly, timely manner. At any time, the presiding officer, in the presiding officer's sole discretion, may set such reaso nable limits as are necessary to prevent disruption of other necessary business. At its most restrictive, Public Comment shall be limited to a total of 15 minutes for the first Public Comment period and shall be concluded not later than 9:45 for the second Publi c Comment period. Individuals may speak for three (3) minutes or less, depending on the number of people wishing to speak. If more than 20 peop le are signed up to speak each speaker may be allocated two (2) minutes. Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference given to those who wish to speak to an item on the meeting’s agenda. If time remains, the presiding officer will call other individuals wish ing to speak, generally in the order in which they have signed in. I f time is available, the presiding officer may call for additional unsigned speakers. Persons speaking shall state their name, whether they reside within the City limits, whether they have any other pertinent co nnection to the City, and whether they are appearing as the representative of an organization. Excerpts: Council Rules of Procedure Section 12 Wednesday November 4, 2026 Port Angeles City Council Meeting Page 2 E. Consent Agenda | Approve 1. Expenditure Report for October 10, 2026 to October 23, 2026 in the amount of $2,857,993.17 / Approve .. E-1 2. Pump Station 4 Odor Scrubber Media Replacement - CON-2026-37 / 1) Award a construction contract CON- 2026-37 to Pacific Coast Carbon LLC of Vancouver, WA, in the amount of $26,767.62, including applicable taxes, for carbon media replacement for the Wastewater utility Pump Station 4, and 2) authorize the City Manager to sign all contract-related documents, to administer the contract, and to make minor modifications as necessary. ....................................................................................................................................................... E-19 3. Vehicle Purchase-Public Works Light Operations Division Van #2650 / 1) Approve the purchase of a new Light Operations Division 2027 Ford T250 Transit Van in an amount not to exceed $75,300.00, including tax and accessories, and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary. ....................................................................... E-21 4. Vehicle Purchase – Replacement of Parks Department Vehicle #6323 / 1) Approve the purchase of a new Parks Department 2027 Ford F250 4x4 Pickup that is the functional equivalent of existing vehicle #6323, in an amount not to exceed $80,600.00, including taxes and accessories, and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary, and 3) authorize the City Manager to surplus vehicle #6323 and to dispose of the vehicle in a commercially reasonable manner, upon addition of the new vehicle to the City fleet. ......................................................... E-23 5. Equipment Purchase – Replacement of Parks Department Equipment #6321 / 1) Approve the purchase of a new Parks Department 2027 John Deere Gator that is the functional equivalent of existing equipment #6321, in an amount not to exceed $14,695.92, including taxes and accessories, and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary, and 3) authorize the City Manager to surplus equipment #6321 and to dispose of the equipment in a commercially reasonable manner, upon addition of the new equipment to the City fleet. ............................. E-25 6. Night Vision Equipment Purchase / 1) Authorize the purchase of five sets of night vision goggles, and the associated training from War Hammar Armaments in an amount not to exceed $40,395.00 plus applicable sales tax, and 2) allow the City Manager to make minor modifications. ................................................................. E-27 7. Material Purchase: 5th & Peabody Signal Detection and Cabinet Equipment / 1) Award a contract with Western Systems Inc. through the WSDOES cooperative purchasing agreement #29023, for traffic signal equipment at a price of $69,130.28 including sales tax, and 2) authorize the City Manager or their designee to execute all contract-related documents, to administer the contract, and to make minor modifications to the contract as necessary. ........................................................................................................................................................ E-29 8. Class B Biosolids Hauling 2026 Contract – CO #3 - SVC-2025-54 / 1) Approve Change Order No. 03 to Service Contract SVC-2025-54 amending and increasing the contract value by $40,000.00 to a new not to exceed value of $260,500.00, and 2) authorize the City Manager to sign all contract-related documents, to administer the contract, and to make minor modifications as necessary. .............................................................................. E-34 9. National League of Cities Voting Delegate / Appoint Mayor Dexter as the City’s delegate to vote at the National League of Cities Annual Business Meeting. .................................................................................................... E-36 10. Western Port Angeles Harbor Alternative Dispute Resolution Agreement / 1) Approve and authorize the City Manager to execute on behalf of the City the WPAH ADR Agreement; 2) to make minor modifications and amendments to the ADR Agreement as needed over time; and 3) to administer the ADR Agreement throughout its duration. .......................................................................................................................................................... E-37 F. Public Hearings | 6:30 p.m. or Soon Thereafter 1. Ordinance Levying 2026 Property Tax for Collection in 2027 / Open Public Hearing / Continue Public Hearing to the November 17, 2026 Meeting / Conduct First Reading .............................................................................. F-1 Wednesday November 4, 2026 Port Angeles City Council Meeting Page 3 PUBLIC HEARINGS Public hearings are set by the City Council in order to meet legal requirements. City Council may set a public hearing in ord er to receive public input prior to making decisions which impact citizens. City Council may choose to seek public opinion through the public hearing process. G. Ordinances Not Requiring Council Public Hearings 1. Municipal Code Amendments to portions of Title 15 of the Port Angeles Municipal Code Related to the 2025 Comprehensive Plan Periodic Update Critical Areas Ordinance (CAO) Component (MCA 26-0090) / 1) Continue discussion from the October 20, 2026 first reading of the ordinance, and 2) continue this matter to the November 17, 2026, Council Meeting. ............................................................................................................................. G-1 H. Resolutions Not Requiring Council Public Hearings ............................................................................... None I. Other Considerations 1. CED 3rd Quarter Economic Development Presentation / For Information Only 2. Clallam County Homelessness Task Force Recommendations 2.0 / Approve ............................................... I-1 3. Port Angeles Healthy Youth Coalition City Council Seat / Discuss .............................................................. I-11 4. Legislative Priorities Discussion / Discuss ..................................................................................................... I-13 5. Association of Washington Cities Center for 2027 Quality Communities Scholarship / Council Discussion and Appoint ..................................................................................................................................................... I-16 J. Contracts & Purchasing 1. Vehicle Purchase – Replacement of Parks Department Vehicle #5335 / Approve and Authorize ................ J-1 K. Council Reports L. Information City Manager Reports: M. Second Public Comment Follow the instructions from the first public comment period. Adjournment November 4,2026 PUBLIC COMMENT SIGN-UP SHEET g > - . a of R tv 4 i s FIDLgik PUBLIC HEARING: Levying Public Comment Agenda 2026 Property Tax for Topic: or No Collection in 2027 PA A1)/M.4 ¢P S ,.t(aaGu(i'1(A/C V l-5 i i7 4 ❑PUBLIC HEARING: Levying f1Public Comment Agenda ��7�7 2026 Property Tax for Topic: Collection in 2027 `i' t friii or No iC)(›A ❑PUBLIC HEARING:Levying ❑Public Comment Agenda 2026 Property Tax for Topic: Yes or No Collection in 2027 ❑PUBLIC HEARING: Levying ❑ Public Comment Agenda 2026 Property Tax for Topic: Yes or No Collection in 2027 ❑PUBLIC HEARING: Levying ❑ Public Comment Agenda 2026 Property Tax for Topic: Yes or No Collection in 2027 ❑PUBLIC HEARING: Levying ❑ Public Comment Agenda 2026 Property Tax for Topic: Yes or No Collection in 2027 ❑PUBLIC HEARING: Levying ❑ Public Comment Agenda 2026 Property Tax for Topic: Yes or No Collection in 2027 Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference given to those who wish to speak to an item on the meeting's agenda. If time remains, the presiding officer will call other individuals wishing to speak, generally in the order in which they have signed in. If time is available, the presiding officer may call for additional unsigned speakers. Persons speaking shall state their name, whether they reside within the City limits, whether they have any other pertinent connection to the City, and whether they are appearing as the representative of an organization. Excerpts: Council Rules of Procedure Section. ,►-.�� PORTANGELES FINANCE siiallMIMF WASHINGToN , U . S . DEPARTMENT November 4, 2026 We,the undersigned City Officials of the City of Port Angeles, do hereby certify that the merchandise and/or services herein specified have been received and that these claims are approved for payment in the amount of$2,857,993.17 this 4th day of November, 2026. ayor City Manager "Where the mountains meet the sea" 360.457.0411 I finance@cityofpa.us www.cityofpa.us 321 E.5th Street,Port Angeles,WA 98362 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 001-0000-237.00-00 106.23 EXCISE TAX RETURNS-SEPT 001-0000-237.30-00 990.62 EXCISE TAX RETURNS-SEPT 001-0000-237.50-00 18,273.64 US BANK CORPORATE PAYMENT SYSTEM CITY CREDIT CARD 001-0000-213.10-95 30,224.75 WA STATE PATROL SEPT 2026 FINGERPRINTS 001-0000-229.50-00 108.00 WASHINGTON (DOL), STATE OF SEPT 2026 CPLS 001-0000-229.60-00 413.00 Division Total:$50,116.24 Department Total:$50,116.24 PACIFICA LAW GROUP, LLP CONSULTING SERVICES 001-1160-511.41-50 1,275.87 Mayor & Council Division Total:$1,275.87 Legislative Department Total:$1,275.87 SOUND PUBLISHING INC COMMUNICATIONS/MEDIA SERV 001-1230-514.44-10 93.22 City Clerk Division Total:$93.22 City Manager Department Total:$93.22 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 001-2023-514.44-50 468.15 WASHINGTON (AUDITOR), STATE OF FINANCIAL SERVICES 001-2023-514.41-50 11.34 Accounting Division Total:$479.49 Finance Department Total:$479.49 CLALLAM CNTY COMMISSIONER'S OFFICE SUPPLIES 001-3012-598.51-23 28,461.46 SUPPLIES 001-3012-598.51-23 32,773.31 SUPPLIES 001-3012-598.51-23 34,850.40 Jail Contributions Division Total:$96,085.17 LEXISNEXIS SUPPLIES 001-3030-515.49-01 480.25 THOMSON REUTERS-WEST SUPPLIES 001-3030-515.49-01 386.60 City Attorney Division Total:$866.85 City Attorney Department Total:$96,952.02 MISC BUILDING PERMIT REFUNDS REFUND FOR BP 26-0894 PER 001-4050-322.10-17 506.48 NEUMO TAX & LICENSING CONSULTING SERVICES 001-4050-558.41-50 28,643.01 Building Division Total:$29,149.49 AKS ENGINEERING & FORESTRY CONSULTING SERVICES 001-4060-558.41-50 4,795.13 MISC TRAVEL A TORRES-WA APA CONF 001-4060-558.43-10 303.80 C BORNSWORTH-PNW ISA CONF 001-4060-558.43-10 794.18 SOUND PUBLISHING INC COMMUNICATIONS/MEDIA SERV 001-4060-558.41-15 101.12 Page 1 of 18 Oct 24, 2026 8:06:16 AM November 4, 2026 E - 1 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount SOUND PUBLISHING INC COMMUNICATIONS/MEDIA SERV 001-4060-558.41-15 118.50 Planning Division Total:$6,112.73 Community Development Department Total:$35,262.22 LEXISNEXIS LIBRARY SERVICES(EXCL 908 001-5010-521.49-01 54.45 POWER DMS INC LIBRARY SERVICES(EXCL 908 001-5010-521.41-50 598.95 PUBLIC SAFETY TESTING INC HUMAN SERVICES 001-5010-521.41-50 483.00 Police Administration Division Total:$1,136.40 DR. PANZA LLC HEALTH RELATED SERVICES 001-5021-521.41-50 275.00 LINCOLN STREET STATION SHIPPING AND HANDLING 001-5021-521.42-10 60.96 MISC TRAVEL K MALONE-WPL TRAINING 001-5021-521.43-10 357.00 Investigation Division Total:$692.96 CURTIS & SONS INC, L N CLOTHING & APPAREL 001-5022-521.31-11 2,071.65 GUNARAMA WHOLESALE, INC POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 (816.75) POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 1,512.22 POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 (947.43) POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 (784.08) POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 172.92 POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 758.60 POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 100.41 POLICE EQUIPMENT & SUPPLY 001-5022-521.35-01 494.41 LINCOLN STREET STATION SHIPPING AND HANDLING 001-5022-521.42-10 95.13 SHIPPING AND HANDLING 001-5022-521.42-10 17.72 OLYMPIC MEDICAL CENTER HEALTH RELATED SERVICES 001-5022-521.49-90 195.00 OLYMPIC PRINTERS INC PRINTING,SILK SCR,TYPSET 001-5022-521.31-01 439.96 PORT ANGELES POLICE DEPARTMENT CAR BULBS/BAGGIES-KB/DM 001-5022-521.31-01 47.87 SNIPER TRAINING EQUIP-DM 001-5022-521.31-80 47.00 VIKING SEW & VAC MISCELLANEOUS SERVICES 001-5022-521.31-11 40.80 MISCELLANEOUS SERVICES 001-5022-521.31-11 81.60 MISCELLANEOUS SERVICES 001-5022-521.31-11 38.08 Patrol Division Total:$3,565.11 CURTIS & SONS INC, L N CLOTHING & APPAREL 001-5026-521.31-11 727.30 CLOTHING & APPAREL 001-5026-521.31-11 171.74 CLOTHING & APPAREL 001-5026-521.31-11 183.04 Reserves & Volunteers Division Total:$1,082.08 CALIBRE PRESS INC HUMAN SERVICES 001-5029-521.43-10 359.00 Page 2 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 2 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount CALIBRE PRESS INC HUMAN SERVICES 001-5029-521.43-10 (359.00) MISC TRAVEL K BUTLER-CRIME SCENE EVID 001-5029-521.43-10 379.88 Records Division Total:$379.88 Police Department Total:$6,856.43 ANGELES MILLWORK & LUMBER NOTIONS & RELATED SEWING 001-6010-522.31-01 24.43 Fire Administration Division Total:$24.43 CURTIS & SONS INC, L N HAND TOOLS ,POW&NON POWER 001-6020-522.31-01 167.15 GALLS CLOTHING & APPAREL 001-6020-522.31-11 78.68 LINCOLN STREET STATION SHIPPING AND HANDLING 001-6020-522.31-01 23.63 Fire Suppression Division Total:$269.46 WALTER E NELSON CO JANITORIAL SUPPLIES 001-6050-522.31-01 183.01 JANITORIAL SUPPLIES 001-6050-522.31-01 60.64 Facilities Maintenance Division Total:$243.65 Fire Department Total:$537.54 BAXTER AUTO PARTS #15 ELECTRICAL EQUIP & SUPPLY 001-7012-532.31-01 22.85 MISC ONE-TIME VENDORS CITY ENGINEER RECRUITMENT 001-7012-532.41-50 300.00 CITY ENGINEER RECRUITMENT 001-7012-532.41-50 300.00 CITY ENGINEER RECRUITMENT 001-7012-532.41-50 300.00 CITY ENGINEER RECRUITMENT 001-7012-532.41-50 300.00 CITY ENGINEER RECRUITMENT 001-7012-532.41-50 1,500.00 WSDOT SPEC BOOKS 001-7012-532.31-01 1,028.14 MISC TRAVEL M MOORE-PE LICENSING EXAM 001-7012-532.43-10 850.16 Engineering & CIP Division Total:$4,601.15 Public Works & Utilities Department Total:$4,601.15 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 001-8050-536.44-50 (761.00) QUIRING MONUMENTS INC MARKERS, PLAQUES,SIGNS 001-8050-536.34-01 400.00 Ocean View Cemetery Division Total:($361.00) ANGELES MILLWORK & LUMBER RENTAL/LEASE EQUIPMENT 001-8080-576.45-30 40.84 CENTRAL WELDING SUPPLY SUPPLIES 001-8080-576.45-30 42.22 HARTNAGEL BUILDING SUPPLY INC HARDWARE,AND ALLIED ITEMS 001-8080-576.31-20 37.24 HAULAWAY STORAGE RENTAL/LEASE EQUIPMENT 001-8080-576.45-30 209.02 HEARTLINE SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 147.02 SEED,SOD,SOIL&INOCULANT 001-8080-576.31-40 269.53 MISC TRAVEL T SHAY-PICK UP TREES FOR 001-8080-576.43-10 112.00 T TUCKER-WA PLACES CONF 001-8080-576.43-10 222.67 Page 3 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 3 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount PORT OF PORT ANGELES RENTAL/LEASE EQUIPMENT 001-8080-576.45-30 7,142.67 PUGET SOUND HARDWARE, INC HARDWARE,AND ALLIED ITEMS 001-8080-576.31-20 698.21 SWAIN'S GENERAL STORE INC FIRST AID & SAFETY EQUIP.001-8080-576.31-01 32.53 FIRST AID & SAFETY EQUIP.001-8080-576.31-20 35.90 POISONS:AGRICUL & INDUSTR 001-8080-576.31-20 49.93 HARDWARE,AND ALLIED ITEMS 001-8080-576.31-20 25.92 HARDWARE,AND ALLIED ITEMS 001-8080-576.31-20 21.75 THURMAN SUPPLY PLUMBING EQUIP FIXT,SUPP 001-8080-576.31-20 42.36 SUPPLIES 001-8080-576.31-20 53.36 BUILDER'S SUPPLIES 001-8080-576.31-20 11.11 SUPPLIES 001-8080-576.31-20 297.69 SUPPLIES 001-8080-576.31-20 16.54 SUPPLIES 001-8080-576.31-20 47.45 SUPPLIES 001-8080-576.31-20 52.66 Parks Facilities Division Total:$9,608.62 Parks & Recreation Department Total:$9,247.62 OTIS ELEVATOR COMPANY INC BUILDING MAINT&REPAIR SER 001-8112-555.48-10 4,413.39 THURMAN SUPPLY PLUMBING EQUIP FIXT,SUPP 001-8112-555.31-20 18.70 Senior Center Facilities Division Total:$4,432.09 GRAINGER SUPPLIES 001-8131-518.31-20 236.69 HD SUPPLY FACILITIES MAINT. REFRIGERATION EQUIPMENT 001-8131-518.35-01 2,118.09 PUGET SOUND HARDWARE, INC HARDWARE,AND ALLIED ITEMS 001-8131-518.31-20 522.50 SWAIN'S GENERAL STORE INC PAINTING EQUIPMENT & ACC 001-8131-518.31-20 35.84 FIRST AID & SAFETY EQUIP.001-8131-518.31-01 184.99 FIRST AID & SAFETY EQUIP.001-8131-518.31-01 125.68 PAINTING EQUIPMENT & ACC 001-8131-518.31-20 28.84 WALTER E NELSON CO JANITORIAL SUPPLIES 001-8131-518.31-20 56.73 JANITORIAL SUPPLIES 001-8131-518.31-20 (35.24) JANITORIAL SUPPLIES 001-8131-518.31-20 35.24 JANITORIAL SUPPLIES 001-8131-518.31-20 (17.62) Central Svcs Facilities Division Total:$3,291.74 Facilities Maintenance Department Total:$7,723.83 General Fund Fund Total:$213,145.63 OLYMPIC PENINSULA VISITOR BUREAU MISC PROFESSIONAL SERVICE 101-1430-557.41-50 2,502.92 Page 4 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 4 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount PENINSULA ADVENTURE SPORTS MISCELLANEOUS SERVICES 101-1430-557.41-50 1,500.00 PORT ANGELES CHAMBER OF COMM MISC PROFESSIONAL SERVICE 101-1430-557.41-50 11,394.13 Lodging Excise Tax Division Total:$15,397.05 Lodging Excise Tax Department Total:$15,397.05 Lodging Excise Tax Fund Total:$15,397.05 BLOOMING NURSERY NURSERY STOCK & SUPPLIES 102-0000-237.00-00 (379.26) DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 102-0000-237.10-00 40.15 NORTH LIGHT COLOR COMPUTER ACCESSORIES&SUPP 102-0000-237.00-00 (2,412.43) COMPUTER ACCESSORIES&SUPP 102-0000-237.00-00 (30.70) COMPUTER ACCESSORIES&SUPP 102-0000-237.00-00 (127.52) Division Total:($2,909.76) Department Total:($2,909.76) AMAZON CAPITAL SERVICES MISCELLANEOUS PRODUCTS 102-7230-542.31-25 550.38 ANGELES MILLWORK & LUMBER MACHINERY & HEAVY HRDWARE 102-7230-542.31-01 24.95 BLOOMING NURSERY NURSERY STOCK & SUPPLIES 102-7230-542.48-10 4,640.64 CASCADE INDUSTRIAL SERVICES PW CONSTRUCTION & RELATED 102-7230-542.48-10 19,729.47 DR. PANZA LLC HEALTH RELATED SERVICES 102-7230-542.49-90 440.00 FAMILY SHOE STORE SHOES AND BOOTS 102-7230-542.31-01 300.00 FASTENAL INDUSTRIAL FIRST AID & SAFETY EQUIP.102-7230-542.31-01 587.09 HERMANN BROS LOGGING & CONST MISCELLANEOUS SERVICES 102-7230-542.31-20 92.40 NORTH LIGHT COLOR COMPUTER ACCESSORIES&SUPP 102-7230-542.31-20 29,518.42 COMPUTER ACCESSORIES&SUPP 102-7230-542.31-25 375.66 COMPUTER ACCESSORIES&SUPP 102-7230-542.31-25 1,560.36 ORKIN EXTERMINATING COMPANY INC ADD'L DUE 102-7230-542.41-50 3.70 TRAFFIC SAFETY SUPPLY CO MARKERS, PLAQUES,SIGNS 102-7230-542.31-25 2,395.43 EQUIP MAINT & REPAIR SERV 102-7230-542.31-25 1,718.79 Street Division Total:$61,937.29 Public Works-Street Department Total:$61,937.29 Street Fund Total:$59,027.53 CENTURYLINK 10-06 A/C 300539444 107-5160-528.42-11 79.89 CENTURYLINK-QWEST 10-03 A/C 333809527 107-5160-528.42-11 278.11 ESCHAT COMMUNICATIONS/MEDIA SERV 107-5160-528.49-01 1,222.56 MISC TRAVEL J CONNER-WA ST PEER SUPPO 107-5160-528.43-11 470.56 Page 5 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 5 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount MISC TRAVEL K HATTON-APCO-NENA FALL C 107-5160-528.43-11 236.68 T LOZANO-APCO-NENA FALL C 107-5160-528.43-11 88.00 T LOZANO-DIGITAL DAY TRAI 107-5160-528.43-11 472.30 T LOZANO-MENTAL HEALTH TR 107-5160-528.43-11 71.00 T LOZANO-CAMP 911 107-5160-528.43-11 40.00 PUBLIC SAFETY TESTING INC HUMAN SERVICES 107-5160-528.41-50 204.00 QUILL CORPORATION OFFICE SUPPLIES, GENERAL 107-5160-528.31-01 56.41 VOIANCE LANGUAGE SERVICES, LLC MISC PROFESSIONAL SERVICE 107-5160-528.42-11 49.00 Pencom Division Total:$3,268.51 Pencom Department Total:$3,268.51 Pencom Fund Total:$3,268.51 GOODMAN SANITATION EQUIP MAINT & REPAIR SERV 175-5260-524.41-50 147.11 Code Enforcement Division Total:$147.11 Criminal Justice Department Total:$147.11 Code Compliance Enforcmt Fund Total:$147.11 AXON ENTERPRISE, INC. POLICE EQUIPMENT & SUPPLY 310-5950-594.65-10 110.39 Homeland Security Division Total:$110.39 Public Safety Projects Department Total:$110.39 COMMONSTREET CONSULTING PW CONSTRUCTION & RELATED 310-7910-594.65-10 3,171.79 PW CONSTRUCTION & RELATED 310-7910-594.65-10 702.37 DIALOG ARCHITECTURE + ENGINEERING CONSULTING SERVICES 310-7910-594.65-10 101,663.02 Cap Improvmt Admin Division Total:$105,537.18 Capital Projects-Pub Wks Department Total:$105,537.18 Capital Improvement Fund Total:$105,647.57 OLYMPIC PENINSULA TITLE CO FINANCIAL SERVICES 312-7930-595.65-10 326.70 SARGENT ENGINEERING, INC ENGINEERING SERVICES 312-7930-595.65-10 3,516.26 TRANSPO GROUP CONSULTING SERVICES 312-7930-595.65-10 2,459.47 CONSULTING SERVICES 312-7930-595.65-10 8,055.00 GF-Street Projects Division Total:$14,357.43 Capital Projects-Pub Wks Department Total:$14,357.43 Transportation Benefit Fund Total:$14,357.43 LINCOLN PARK BMX ASSOCIATION PARK,PLAYGROUND,REC EQUIP 316-8982-594.65-10 5,445.00 Park Improvmt Division Total:$5,445.00 Page 6 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 6 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount Capital Proj-Parks & Rec Department Total:$5,445.00 Park Improvement Fund Fund Total:$5,445.00 MISC UTILITY DEPOSIT REFUNDS FINAL BILL REFUND 401-0000-122.10-99 0.20 FINAL BILL REFUND 401-0000-122.10-99 6.98 FINAL BILL REFUND 401-0000-122.10-99 9.40 FINAL BILL REFUND 401-0000-122.10-99 10.94 FINAL BILL REFUND 401-0000-122.10-99 13.73 FINAL BILL REFUND 401-0000-122.10-99 20.97 FINAL BILL REFUND 401-0000-122.10-99 30.97 FINAL BILL REFUND 401-0000-122.10-99 33.42 FINAL BILL REFUND 401-0000-122.10-99 33.90 FINAL BILL REFUND 401-0000-122.10-99 35.10 FINAL BILL REFUND 401-0000-122.10-99 37.80 FINAL BILL REFUND 401-0000-122.10-99 40.11 FINAL BILL REFUND 401-0000-122.10-99 47.04 FINAL BILL REFUND 401-0000-122.10-99 48.39 FINAL BILL REFUND 401-0000-122.10-99 59.75 FINAL BILL REFUND 401-0000-122.10-99 71.20 FINAL BILL REFUND 401-0000-122.10-99 71.70 FINAL BILL REFUND 401-0000-122.10-99 72.66 FINAL BILL REFUND 401-0000-122.10-99 73.68 FINAL BILL REFUND 401-0000-122.10-99 76.61 FINAL BILL REFUND 401-0000-122.10-99 78.96 FINAL BILL REFUND 401-0000-122.10-99 84.24 FINAL BILL REFUND 401-0000-122.10-99 89.00 FINAL BILL REFUND 401-0000-122.10-99 90.82 FINAL BILL REFUND 401-0000-122.10-99 95.30 FINAL BILL REFUND 401-0000-122.10-99 97.88 FINAL BILL REFUND 401-0000-122.10-99 105.94 FINAL BILL REFUND 401-0000-122.10-99 118.47 FINAL BILL REFUND 401-0000-122.10-99 131.45 FINAL BILL REFUND 401-0000-122.10-99 140.17 FINAL BILL REFUND 401-0000-122.10-99 144.35 FINAL BILL REFUND 401-0000-122.10-99 159.55 FINAL BILL REFUND 401-0000-122.10-99 164.12 Page 7 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 7 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount MISC UTILITY DEPOSIT REFUNDS FINAL BILL REFUND 401-0000-122.10-99 183.36 FINAL BILL REFUND 401-0000-122.10-99 188.63 FINAL BILL REFUND 401-0000-122.10-99 205.49 FINAL BILL REFUND 401-0000-122.10-99 231.94 FINAL BILL REFUND 401-0000-122.10-99 249.68 FINAL BILL REFUND 401-0000-122.10-99 266.59 FINAL BILL REFUND 401-0000-122.10-99 269.50 FINAL BILL REFUND 401-0000-122.10-99 270.38 FINAL BILL REFUND 401-0000-122.10-99 282.91 FINAL BILL REFUND 401-0000-122.10-99 290.28 FINAL BILL REFUND 401-0000-122.10-99 360.32 FINAL BILL REFUND 401-0000-122.10-99 375.28 FINAL CREDIT-1133 HAZEL D 401-0000-122.10-99 112.68 FINAL CREDIT-2606 PEACH A 401-0000-122.10-99 423.90 Division Total:$6,005.74 Department Total:$6,005.74 AMAZON CAPITAL SERVICES OFFICE MACHINES & ACCESS 401-7111-533.31-60 42.05 OLYMPIC PRINTERS INC OFFICE SUPPLIES, GENERAL 401-7111-533.31-01 224.33 Engineering-Electric Division Total:$266.38 MISC CITY CONSERVATION REBATES RENEWABLE ENEREGY SYS - 6 401-7120-533.49-86 853.44 RENEWABLE ENEREGY SYS - 6 401-7120-533.49-86 932.16 RENEWABLE ENEREGY SYS - 6 401-7120-533.49-86 997.92 RENEWABLE ENERGY SYSTEM 6 401-7120-533.49-86 797.37 RENEWABLE ENERGY SYSTEM 6 401-7120-533.49-86 909.00 RENEWABLE ENERGY SYSTEM 6 401-7120-533.49-86 1,077.66 6.30.25 - 6.30.25 401-7120-533.49-86 477.54 6.30.25 - 6.30.26 401-7120-533.49-86 219.45 6.30.25 - 6.30.26 401-7120-533.49-86 466.09 6.30.25 - 6.30.26 401-7120-533.49-86 897.12 6.30.25 - 6.30.26 401-7120-533.49-86 1,478.18 6/30/25 - 6/30/26 401-7120-533.49-86 1,025.92 MISC TRAVEL J CURRIE-WESTERN WA UTILI 401-7120-533.43-10 235.80 WASHINGTON (AUDITOR), STATE OF FINANCIAL SERVICES 401-7120-533.41-50 3,763.98 Power Systems Division Total:$14,131.63 Page 8 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 8 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount AMAZON CAPITAL SERVICES ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 31.85 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 249.18 HARDWARE,AND ALLIED ITEMS 401-7180-533.31-01 138.99 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 35.47 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 45.22 MATERIAL HNDLING&STOR EQP 401-7180-533.32-10 394.23 MATERIAL HNDLING&STOR EQP 401-7180-533.31-20 71.66 SUPPLIES 401-7180-533.31-01 308.31 SUPPLIES 401-7180-533.31-01 387.47 SHIPPING CREDIT 401-7180-533.42-10 (7.62) SUPPLIES 401-7180-533.31-01 96.75 CED/CONSOLIDATED ELEC DIST ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 0.78 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 499.81 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-20 108.55 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 35.30 HAND TOOLS ,POW&NON POWER 401-7180-533.35-01 2,389.20 CLALLAM CNTY AUDITOR MANAGEMENT SERVICES 401-7180-533.47-10 304.50 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 401-7180-533.44-50 61,991.34 FEDERAL EXPRESS CORP SHIPPING CHARGES 401-7180-533.42-10 7.93 SHIPPING CHARGES 401-7180-533.42-10 6.68 GRAINGER ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 49.68 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 197.17 HARDWARE,AND ALLIED ITEMS 401-7180-533.34-02 79.27 HEARTLINE HARDWARE,AND ALLIED ITEMS 401-7180-533.31-01 31.53 MISC TRAVEL J BREITHAUPT-SUBSTATION B 401-7180-533.43-10 123.88 OVERTON SAFETY TRAINING, INC HUMAN SERVICES 401-7180-533.43-10 10,341.85 SECURITY SERVICES NW, INC COMMUNICATIONS/MEDIA SERV 401-7180-533.41-50 107.81 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 401-7180-533.49-90 25.19 ZORO TOOLS CLOTHING ACCESSORIES(SEE 401-7180-533.31-01 357.06 Electric Operations Division Total:$78,409.04 Public Works-Electric Department Total:$92,807.05 Electric Utility Fund Total:$98,812.79 ALS ENVIRONMENTAL MISC PROFESSIONAL SERVICE 402-0000-237.00-00 (24.47) FERGUSON ENTERPRISES INC PIPE AND TUBING 402-0000-141.40-00 2,138.15 Page 9 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 9 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount FLEXASEAL ENGINEERED SEALS & SYSTEM PLUMBING EQUIP FIXT,SUPP 402-0000-237.00-00 (204.21) Division Total:$1,909.47 Department Total:$1,909.47 ALS ENVIRONMENTAL MISC PROFESSIONAL SERVICE 402-7380-534.41-50 299.47 AMAZON CAPITAL SERVICES BRUSHES (NOT CLASSIFIED) 402-7380-534.31-01 57.97 HARDWARE,AND ALLIED ITEMS 402-7380-534.31-01 59.79 OFFICE MECH AIDS,SM MACH 402-7380-534.31-01 89.03 PLUMBING EQUIP FIXT,SUPP 402-7380-534.31-20 150.32 ANGELES MILLWORK & LUMBER BRUSHES (NOT CLASSIFIED) 402-7380-534.31-01 52.69 PAINTS,COATINGS,WALLPAPER 402-7380-534.31-20 77.95 PAINTS,COATINGS,WALLPAPER 402-7380-534.31-20 26.68 LUMBER& RELATED PRODUCTS 402-7380-534.31-20 331.59 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 402-7380-534.44-50 31,150.84 EUROFINS DRINKING WATER & WASTEWATE MISC PROFESSIONAL SERVICE 402-7380-534.41-50 1,528.00 FERGUSON ENTERPRISES INC AIR CONDITIONING & HEATNG 402-7380-534.31-20 1,859.23 FLEXASEAL ENGINEERED SEALS & SYSTEM PLUMBING EQUIP FIXT,SUPP 402-7380-534.31-20 2,498.77 MISC CITY CONSERVATION REBATES RAIN BARREL - LID #154144 402-7380-534.49-90 50.00 RAIN BARREL - LID 102922 402-7380-534.49-90 25.00 MISC EMPLOYEE EXPENSE REIMBURSEMENT WORK BOOTS - 10/09/26 402-7380-534.31-01 212.34 ORKIN EXTERMINATING COMPANY INC ADD'L DUE 402-7380-534.41-50 3.70 PLATT ELECTRIC SUPPLY INC FASTENERS, FASTENING DEVS 402-7380-534.31-20 43.80 ROBUST RENTALS PW CONSTRUCTION & RELATED 402-7380-534.45-30 660.90 SPECTRA LABORATORIES-KITSAP TESTING&CALIBRATION SERVI 402-7380-534.41-50 333.00 TESTING&CALIBRATION SERVI 402-7380-534.41-50 269.00 SWAIN'S GENERAL STORE INC CLOTHING & APPAREL 402-7380-534.31-01 320.97 PAPER & PLASTIC-DISPOSABL 402-7380-534.31-01 38.17 THURMAN SUPPLY PIPE FITTINGS 402-7380-534.31-20 5.82 PIPE FITTINGS 402-7380-534.31-20 106.55 TMG SERVICES INC PIPE AND TUBING 402-7380-534.31-20 2,710.09 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 402-7380-534.49-90 25.18 Water Division Total:$42,986.85 Page 10 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 10 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount ANGELES MILLWORK & LUMBER LUMBER& RELATED PRODUCTS 402-7382-534.31-20 146.73 AUTO & TRUCK MAINT. ITEMS 402-7382-534.31-20 104.74 THURMAN SUPPLY ELECTRICAL EQUIP & SUPPLY 402-7382-534.31-20 28.96 Industrial Water Treatmnt Division Total:$280.43 Public Works-Water Department Total:$43,267.28 Water Utility Fund Total:$45,176.75 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 403-0000-237.00-00 69.94 Division Total:$69.94 Department Total:$69.94 ANGELES MILLWORK & LUMBER ROAD/HWY MAT NONASPHALTIC 403-7480-535.31-20 10.78 BRANOM INSTRUMENT COMPANY SHIPPING AND HANDLING 403-7480-535.31-20 42.97 WATER SEWAGE TREATMENT EQ 403-7480-535.31-20 1,453.34 CUES PHOTOGRAPHIC EQUIPMENT 403-7480-535.31-01 678.49 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 403-7480-535.44-50 25,631.45 DR. PANZA LLC HEALTH RELATED SERVICES 403-7480-535.49-90 440.00 FERGUSON ENTERPRISES INC PIPE FITTINGS 403-7480-535.31-20 133.40 FOWLER COMPANY, H D PIPE AND TUBING 403-7480-535.31-20 5,195.20 PLUMBING EQUIP FIXT,SUPP 403-7480-535.35-01 2,602.95 HARTNAGEL BUILDING SUPPLY INC HARDWARE,AND ALLIED ITEMS 403-7480-535.35-01 309.05 LUMBER& RELATED PRODUCTS 403-7480-535.31-20 349.00 HEARTLINE HARDWARE,AND ALLIED ITEMS 403-7480-535.31-20 31.53 HERMANN BROS LOGGING & CONST MISCELLANEOUS SERVICES 403-7480-535.31-20 96.00 MISCELLANEOUS SERVICES 403-7480-535.31-20 110.70 LINCOLN STREET STATION USPS CHARGES-REETZ 403-7480-535.42-10 13.56 MISC TRAVEL D FREED-PNW PRETREATMENT 403-7480-535.43-10 990.98 NAPA AUTO PARTS BELTS AND BELTING 403-7480-535.31-20 67.39 NCL NORTH CENTRAL LABORATORIES CHEMICAL LAB EQUIP & SUPP 403-7480-535.31-01 343.09 ORKIN EXTERMINATING COMPANY INC ADD'L DUE 403-7480-535.41-50 3.70 PORT ANGELES CITY TREASURER CERTIFIED MAIL-FREED 403-7480-535.42-10 11.02 PROFESSIONAL TRAINING ASSN WILLIAMS 403-7480-535.43-10 864.00 PUD #1 OF CLALLAM COUNTY MISC PROFESSIONAL SERVICE 403-7480-535.47-10 351.06 SWAIN'S GENERAL STORE INC TAPE(NOT DP,SOUND,VIDEO) 403-7480-535.31-01 16.49 BRUSHES (NOT CLASSIFIED) 403-7480-535.31-01 93.37 Page 11 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 11 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount SWAIN'S GENERAL STORE INC SALT (SODIUM CHLORIDE) 403-7480-535.31-01 11.14 BOATS,MOTORS,& MARINE SUP 403-7480-535.31-20 7.32 TENELCO MISCELLANEOUS SERVICES 403-7480-535.47-10 4,210.37 MISCELLANEOUS SERVICES 403-7480-535.47-10 4,953.20 MISCELLANEOUS SERVICES 403-7480-535.47-10 5,012.86 MISCELLANEOUS SERVICES 403-7480-535.47-10 5,204.49 MISCELLANEOUS SERVICES 403-7480-535.47-10 5,084.77 MISCELLANEOUS SERVICES 403-7480-535.47-10 6,125.27 THURMAN SUPPLY PIPE FITTINGS 403-7480-535.31-20 67.74 PIPE FITTINGS 403-7480-535.31-20 565.76 PIPE FITTINGS 403-7480-535.31-20 42.59 PIPE FITTINGS 403-7480-535.31-20 46.85 PIPE FITTINGS 403-7480-535.31-20 320.24 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 403-7480-535.49-90 25.18 WHITNEY EQUIPMENT CO INC BOATS,MOTORS,& MARINE SUP 403-7480-535.31-01 344.90 Wastewater Division Total:$71,862.20 Public Works-Wastewater Department Total:$71,862.20 Wastewater Utility Fund Total:$71,932.14 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 404-0000-237.00-00 242.26 Division Total:$242.26 Department Total:$242.26 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 404-7538-537.44-50 37,555.32 HERMANN BROS LOGGING & CONST MISCELLANEOUS SERVICES 404-7538-537.41-50 1,575.00 MISC EMPLOYEE EXPENSE REIMBURSEMENT SEPTEMBER MILEAGE REIMBUS 404-7538-537.31-01 29.26 SEPTEMBER MILEAGE REIMBUS 404-7538-537.31-01 65.82 SEPTEMBER MILEAGE REIMBUS 404-7538-537.31-01 233.62 RABANCO, LTD MISCELLANEOUS SERVICES 404-7538-537.41-51 46,076.40 SW - Transfer Station Division Total:$85,535.42 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 404-7580-537.44-50 27,178.86 DR. PANZA LLC HEALTH RELATED SERVICES 404-7580-537.49-90 220.00 MISC EMPLOYEE EXPENSE REIMBURSEMENT SAFETY GLASSES 10/14/26 404-7580-537.31-01 200.00 ORKIN EXTERMINATING COMPANY INC ADD'L DUE 404-7580-537.41-50 3.70 Page 12 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 12 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount Solid Waste-Collections Division Total:$27,602.56 GEOSYNTEC CONSULTANTS CONSULTING SERVICES 404-7585-537.41-50 4,862.00 Solid Waste-Landfill Division Total:$4,862.00 Public Works-Solid Waste Department Total:$117,999.98 Solid Waste Utility Fund Total:$118,242.24 ACF WEST, INC SEED,SOD,SOIL&INOCULANT 406-7412-538.31-20 1,633.50 ANGELES MILLWORK & LUMBER PIPE FITTINGS 406-7412-538.31-20 30.05 PAINTS,COATINGS,WALLPAPER 406-7412-538.31-01 19.73 CLALLAM COOPERATIVE ASSN INC SEED,SOD,SOIL&INOCULANT 406-7412-538.31-20 364.55 DEPARTMENT OF REVENUE EXCISE TAX RETURNS-SEPT 406-7412-538.49-50 263.98 HEARTLINE SEED,SOD,SOIL&INOCULANT 406-7412-538.31-20 69.70 SEED,SOD,SOIL&INOCULANT 406-7412-538.31-20 69.70 SWAIN'S GENERAL STORE INC LAWN MAINTENANCE EQUIP 406-7412-538.35-01 110.95 FIRST AID & SAFETY EQUIP.406-7412-538.31-01 95.15 PLUMBING EQUIP FIXT,SUPP 406-7412-538.31-01 25.64 THURMAN SUPPLY PIPE FITTINGS 406-7412-538.31-20 87.38 PIPE FITTINGS 406-7412-538.31-20 203.21 UTILITIES UNDERGROUND LOC CTR MISCELLANEOUS SERVICES 406-7412-538.49-90 25.19 Stormwater Division Total:$2,998.73 Public Works-Wastewater Department Total:$2,998.73 Stormwater Utility Fund Total:$2,998.73 A/R MISCELLANEOUS REFUNDS ROBERTA HARRISON 409-0000-213.10-90 150.00 Division Total:$150.00 Department Total:$150.00 CEDAR GROVE COUNSELING, INC. HEALTH RELATED SERVICES 409-6025-526.41-50 150.00 LIFE ASSIST SALE SURPLUS/OBSOLETE 409-6025-526.31-01 244.37 LINCOLN STREET STATION SHIPPING AND HANDLING 409-6025-526.43-10 18.08 WITMER PUBLIC SAFETY GROUP FIRST AID & SAFETY EQUIP.409-6025-526.31-01 772.05 Medic I Division Total:$1,184.50 Fire Department Total:$1,184.50 Medic I Utility Fund Total:$1,334.50 MISC CITY CONSERVATION REBATES HEAT PUMP - LID #106744 421-7121-533.49-86 2,451.01 Conservation Division Total:$2,451.01 Page 13 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 13 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount Public Works-Electric Department Total:$2,451.01 Conservation Fund Total:$2,451.01 HDR ENGINEERING, INC CONSULTING SERVICES 451-7188-594.65-10 7,428.75 MAGNUM POWER, LLC CONSTRUCTION SERVICES,GEN 451-7188-594.65-10 132,622.12 Electric Projects Division Total:$140,050.87 Public Works-Electric Department Total:$140,050.87 Electric Utility CIP Fund Total:$140,050.87 OLYMPIC PENINSULA TITLE CO FINANCIAL SERVICES 452-7388-594.65-10 6,534.00 RH2 ENGINEERING CONSULTING SERVICES 452-7388-594.65-10 12,205.88 Water Projects Division Total:$18,739.88 Public Works-Water Department Total:$18,739.88 Water Utility CIP Fund Total:$18,739.88 CONSTRUCTION INSPECTION SERVICES ENVIRONMENTAL&ECOLOGICAL 453-7488-594.65-10 2,039.42 INTERWEST CONSTRUCTION, INC. CONSTRUCTION SERVICES,HEA 453-7488-594.65-10 537,839.98 SCI INFRASTRUCTURE LLC CONSTRUCTION SERVICES,HEA 453-7488-594.65-10 29,082.62 CONSTRUCTION SERVICES,HEA 453-7488-594.65-10 137,176.02 Wastewater Projects Division Total:$706,138.04 Public Works-Wastewater Department Total:$706,138.04 WasteWater Utility CIP Fund Total:$706,138.04 AMAZON CAPITAL SERVICES AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 219.00 RADIO & TELECOMMUNICATION 501-0000-141.40-00 234.77 RADIO & TELECOMMUNICATION 501-0000-141.40-00 65.34 BAXTER AUTO PARTS #15 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 34.87 DAREN'S POINT S AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 1,075.44 N C MACHINERY CO AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 205.95 NAPA AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 27.14 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 53.10 FUEL PUMP-VEH 5335 501-0000-141.40-00 267.79 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 58.35 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 39.82 O'REILLY AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 (130.68) AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 254.22 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 162.72 PAPE-KENWORTH NORTHWEST, AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 398.41 Page 14 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 14 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount INC PETROCARD, INC FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 2,431.44 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 26,465.10 POMP'S TIRE SERVICE AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 2,192.26 PRICE FORD LINCOLN AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 54.38 PSI ELECTRONICS, LLC RADIO & TELECOMMUNICATION 501-0000-141.40-00 15,821.26 TACOMA SCREW PRODUCTS INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 926.19 Division Total:$50,856.87 Department Total:$50,856.87 AMAZON CAPITAL SERVICES AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 17.94 ANGELES COLLISION REPAIR EXTERNAL LABOR SERVICES 501-7630-548.34-02 366.53 AUTOZONE STORES, INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 52.09 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 96.26 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 159.67 COPY CAT GRAPHICS & SIGNS AUTO & TRUCK ACCESSORIES 501-7630-548.34-02 353.93 AUTO & TRUCK ACCESSORIES 501-7630-548.34-02 598.95 DAREN'S POINT S EXTERNAL LABOR SERVICES 501-7630-548.34-02 62.07 EXTERNAL LABOR SERVICES 501-7630-548.34-02 28.04 EXTERNAL LABOR SERVICES 501-7630-548.34-02 28.04 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 817.28 EXTERNAL LABOR SERVICES 501-7630-548.34-02 815.84 GRAINGER AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 98.18 LES SCHWAB TIRE CENTER AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 163.35 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 1,549.94 EXTERNAL LABOR SERVICES 501-7630-548.34-02 52.11 EXTERNAL LABOR SERVICES 501-7630-548.34-02 132.64 EXTERNAL LABOR SERVICES 501-7630-548.34-02 326.55 MATT'S TOOLS USA, LLC AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 102.32 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 83.42 NAPA AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 97.68 AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 117.22 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 163.39 O'REILLY AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 (172.41) AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 331.13 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 (43.56) Page 15 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 15 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount O'REILLY AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 148.10 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 241.95 BELTS AND BELTING 501-7630-548.34-02 126.73 ORKIN EXTERMINATING COMPANY INC ADD'L DUE 501-7630-548.41-50 3.70 PACIFIC POWER GENERATION AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 1,730.99 PORT ANGELES AUTO GLASS AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 1,066.13 RUDDELL AUTO MALL AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 12,496.28 SNAP-ON TOOLS - SARGENT TOOLS LLC AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 17.53 TACOMA SCREW PRODUCTS INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 171.34 AUTO & TRUCK MAINT. ITEMS 501-7630-548.31-01 81.57 THURMAN SUPPLY AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 32.66 VESTIS SERVICES LAUNDRY/DRY CLEANING SERV 501-7630-548.49-90 19.16 WORLD KINECT ENERGY SVCS FUEL,OIL,GREASE, & LUBES 501-7630-548.32-13 245.03 FUEL,OIL,GREASE, & LUBES 501-7630-548.32-13 95.58 Equipment Services Division Total:$22,875.35 Public Works Department Total:$22,875.35 Equipment Services Fund Total:$73,732.22 ASTOUND BROADBAND COMMUNICATIONS/MEDIA SERV 502-2081-518.42-12 11,002.18 COMPUTERS,DP & WORD PROC. 502-2081-518.42-12 290.89 DATA PROC SERV &SOFTWARE 502-2081-518.42-12 7,260.57 CANON USA, INC OFFICE MACHINES & ACCESS 502-2081-518.45-31 4,131.99 MISC EMPLOYEE EXPENSE REIMBURSEMENT MEAL TICKET COUNCIL MEETI 502-2081-518.31-01 46.00 Information Technologies Division Total:$22,731.63 PUD #1 OF CLALLAM COUNTY RADIO & TELECOMMUNICATION 502-2083-518.47-10 62.46 Wireless Mesh Division Total:$62.46 Finance Department Total:$22,794.09 Information Technology Fund Total:$22,794.09 AWC EMPLOYEE BENEFITS TRUST MED PREMIUMS-OCT 503-1631-517.46-30 291,466.99 MED PREMIUMS-OCT 503-1631-517.46-31 8,451.16 MED PREMIUMS-OCT 503-1631-517.46-32 2,096.25 MED PREMIUMS-OCT 503-1631-517.46-34 8,066.20 HSA BANK EMPLOYER CONTRIBUTION 503-1631-517.46-30 3,400.00 EMPLOYEE DEDUCTIONS 503-1631-517.46-30 5,601.28 Page 16 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 16 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount MISC EMPLOYEE EXPENSE REIMBURSEMENT EMPLOYEE REIMBURSEMENT 503-1631-517.41-51 348.44 NW ADMIN TRANSFER ACCT INSURANCE, ALL TYPES 503-1631-517.46-33 119,592.40 INSURANCE, ALL TYPES 503-1631-517.46-34 6,947.20 REDACTED DISABILITY BOARD-AUGUST 503-1631-517.46-35 16.65 DISABILITY BOARD-AUGUST 503-1631-517.46-35 161.71 DISABILITY BOARD-AUGUST 503-1631-517.46-35 2,521.30 REDQUOTE, INC. HRA REIMBURSEMENT 503-1631-365.90-20 127.83 Other Insurance Programs Division Total:$448,797.41 DEPARTMENT OF LABOR & INDUSTRIES 3RD QUARTER L&I REPORT 503-1661-517.49-50 173,028.72 WASHINGTON HOSPITAL SVCS JULY FEE FOR SERVICE 503-1661-517.41-50 750.00 AUGUST FEE FOR SERVICE 503-1661-517.41-50 750.00 SEPTEMBER FEE FOR SERVICE 503-1661-517.41-50 750.00 OCTOBER FEE FOR SERVICE 503-1661-517.41-50 750.00 Worker's Compensation Division Total:$176,028.72 MISC CLAIM SETTLEMENTS IN HOUSE LIABILITY CLAIM 503-1671-517.49-98 4,100.00 WCIA (WA CITIES INS AUTHORITY) PROFESSIONAL LEGAL SERVIC 503-1671-517.41-50 3,627.00 PROFESSIONAL LEGAL SERVIC 503-1671-517.41-50 4,449.00 Comp Liability Division Total:$12,176.00 Self Insurance Department Total:$637,002.13 Self-Insurance Fund Total:$637,002.13 AWC EMPLOYEE BENEFITS TRUST MED PREMIUMS-OCT 920-0000-231.53-30 793.20 CHAPTER 13 TRUSTEE CASE 3 125-11570 920-0000-231.56-90 1,384.62 EMPLOYEES ASSOCIATION PAYROLL SUMMARY 920-0000-231.55-30 1,096.00 EMPOWER-P/R WIRE PAYROLL SUMMARY 920-0000-231.52-10 456.51 PAYROLL SUMMARY 920-0000-231.52-20 33,091.44 FEDERAL PAYROLL TAX PAYROLL SUMMARY 920-0000-231.50-10 20.00 PAYROLL SUMMARY 920-0000-231.50-10 118,989.44 PAYROLL SUMMARY 920-0000-231.50-10 1,092.36 FICA/MEDICARE PAYROLL TAX PAYROLL SUMMARY 920-0000-231.50-20 25.96 PAYROLL SUMMARY 920-0000-231.50-20 135,762.48 PAYROLL SUMMARY 920-0000-231.50-20 1,155.54 FIREFIGHTER'S LOCAL 656 PAYROLL SUMMARY 920-0000-231.54-30 322.20 HRA VEBA PLAN PAYROLL SUMMARY 920-0000-231.52-60 2,773.59 Page 17 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 17 City of Port Angeles City Council Expenditure Report Between Oct 10, 2026 and Oct 23, 2026 Vendor Description Account Number Amount HSA BANK PAYROLL SUMMARY 920-0000-231.53-11 384.96 PAYROLL SUMMARY 920-0000-231.53-12 146.00 EMPLOYEE CONTRIBUTIONS 920-0000-231.52-40 50.00 EMPLOYEE DEDUCTIONS 920-0000-231.52-40 186.00 LEOFF PAYROLL SUMMARY 920-0000-231.51-21 51,337.28 MISSION SQUARE-P/R WIRES PAYROLL SUMMARY 920-0000-231.52-10 (1,000.00) PAYROLL SUMMARY 920-0000-231.52-10 43,805.82 OFFICE OF SUPPORT ENFORCEMENT PAYROLL SUMMARY 920-0000-231.56-20 1,522.18 PERS PAYROLL SUMMARY 920-0000-231.51-12 18.60 PAYROLL SUMMARY 920-0000-231.51-10 601.81 PAYROLL SUMMARY 920-0000-231.51-11 14,364.36 PAYROLL SUMMARY 920-0000-231.51-12 71,812.72 PAYROLL SUMMARY 920-0000-231.51-22 8,132.25 PAYROLL SUMMARY 920-0000-231.51-12 602.13 TEAMSTERS LOCAL 589 PAYROLL SUMMARY 920-0000-231.54-10 2,929.50 PAYROLL SUMMARY 920-0000-231.54-10 2,870.00 UNITED WAY (PAYROLL) PAYROLL SUMMARY 920-0000-231.56-10 225.00 WSCFF/EMPLOYEE BENEFIT TRUST PAYROLL SUMMARY 920-0000-231.53-20 7,200.00 Division Total:$502,151.95 Department Total:$502,151.95 Payroll Clearing Fund Total:$502,151.95 Total for Checks Dated Between Oct 10, 2026 and Oct 23, 2026 $2,857,993.17 Page 18 of 18 Oct 24, 2026 8:06:16 AMNovember 4, 2026 E - 18 Date: November 4, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Pump Station 4 Odor Scrubber Media Replacement - CON-2026-37 Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: The Wastewater utility Pump Station 4, located along Marine Drive in the downtown area, is the City’s primary system for conveyance of wastewater to the Wastewater Treatment Plant. It was constructed as part of the Combined Sewer Overflow (CSO) Reduction Facilities project and became active in 2016. It consists of a separate wet well/drywell configuration with a supply and exhaust ventilation system to maintain safe air quality in the spaces. The exhaust from the ventilation system from the wet well is pumped through the carbon media odor scrubber to reduce odor before the air is released into the atmosphere. The scope of the contract includes sampling and profiling of the spent carbon, removal and disposal of the spent carbon, and the purchase and installation of the new carbon. Notice of the bid opportunity for Pump Station 4 Odor Scrubber Media Replacement was advertised on September 18, 2026, through the Builders Exchange of Washington, the Peninsula Daily News, and posted to the City website. On October 1, 2026, two bids were received and opened with Pacific Coast Carbon LLC of Vancouver, WA being the lowest, responsive, responsible bidder with a total contract amount of $26,767.42, including applicable taxes. Summary: Staff is seeking City Council approval to award a construction contract, CON-2026-37, to Pacific Coast Carbon, LLC of Vancouver, WA, in the amount of $26,767.62, including applicable taxes, for carbon media replacement for the Wastewater utility Pump Station 4. Pump Station 4, located on Marine Drive in the downtown area, has an odor scrubber that uses activated carbon media to reduce odors prior to being emitted to the atmosphere and requires replacement every ten years to assure effectiveness. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Funding: Funding is available in the amount of $40,000.00, including applicable taxes, and is identified in the 2026 wastewater operational budget (403-7480-535-4810) for Pump Station 4 Odor Scrubber Media Replacement. Recommendation: 1) Award a construction contract CON-2026-37 to Pacific Coast Carbon LLC of Vancouver, WA, in the amount of $26,767.62, including applicable taxes, for carbon media replacement for the Wastewater utility Pump Station 4, and 2) authorize the City Manager to sign all contract-related documents, to administer the contract, and to make minor modifications as necessary. November 4, 2026 E - 19 The total bid amounts, including taxes, are tabulated in the following table: Contractor Location Total Bid Pacific Coast Carbon LLC Vancouver, WA $26,767.62 Carbon Activated Corporation Compton, CA $34,419.21 Engineer's Estimate N/A $32,000.00 - $35,000.00 Funding Overview: Funding is available in the amount of $40,000.00, including applicable taxes, and is identified in the 2026 wastewater operational budget (403-7480-535-4810) for Pump Station 4 Odor Scrubber Media Replacement. Attachment(s): None November 4, 2026 E - 20 Date: November 4, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Vehicle Purchase-Public Works Light Operations Division Van Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by City Council on October 1, 2024. This purchase directly aligns with Strategic Focus Area #4 - Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: The proposed new Light Operations Division vehicle will be a 2027 Ford Transit T250 Van and will feature a 3.5L V6 engine that burns unleaded fuel, with an estimated fuel economy of 14mpg. A hybrid and electric model is unavailable at this time. The new vehicle is designed to meet the mission parameters of the City Electrician and will be outfitted to supply a secure work area, tool storage, and an easy lift ladder rack to help prevent back injuries. As a new addition to the fleet, a surplus vehicle will not be associated with this purchase. This purchase furthers Equipment Services efforts to consolidate and streamline the fleet. It is noted that a van previously existed for this position, however it was transferred to our Industrial Electrician Position within the Operations Division some years ago. This new purchase will now provide a much needed vehicle for our City Electrician. Funding Overview: This vehicle replacement is identified in the 2026 budget (501-7630-594-6410), and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $73,500.00, including applicable taxes and accessories. Summary: Staff is seeking City Council approval for the procurement of a new 2027 Ford Transit T250 Van for the Light Operations Division in the amount of $75,300.00, including taxes and accessories. Through the City’s membership in the Washington State Purchasing Cooperative, participating vendor Bud Clary Ford of Longview, WA was selected from the cooperative vendors list, Contract No. 28423. Strategic Plan: This proposal directly aligns with Strategic Focus Area#4 – Infrastructure Development, Maintenance, and Connectivity. Funding: This vehicle replacement is identified in the 2026 budget (501-7630-594-6410), and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $73,500.00, including applicable taxes and accessories. Recommendation: 1) Approve the purchase of a new Light Operations Division 2027 Ford T250 Transit Van in an amount not to exceed $75,300.00, including tax and accessories, and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary. November 4, 2026 E - 21 Pricing from the Washington State Purchasing Cooperative contract is summarized below: Attachment(s): None Photo provided for reference New Vehicle Type Vehicle Budget WSPC Bid Accessories Replacing Vehicle (1) 2027 Ford T250 Transit Van $75,300.00 $65,868.07 $9,431.93 N/A Total Cost $75,300.00 November 4, 2026 E - 22 Date: November 4, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Vehicle Purchase – Replacement of Parks Department Vehicle #6323 Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: The Parks Department vehicle #6323 is 20 years old with over 108,437 miles of operation, has accrued $46,470.86 in repairs and maintenance, and has a current fuel economy of 12mpg. To maintain operational effectiveness, it is necessary to replace this piece of equipment at this time as it is now beyond its fiscally responsible service life. It will be replaced by a 2027 Ford F250 4x4 pickup truck with a 6.7L V8 diesel engine that will utilize R99 renewable diesel, a recognized green fuel. Currently, hybrid or electric models of this vehicle are unavailable. This purchase furthers Equipment Services efforts to consolidate and streamline the fleet, while following Green Fleet requirements. Funding Overview: This vehicle replacement is identified in the 2026 budget (501-7630-594-6410) and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $80,600.00, including taxes and accessories. Summary: Staff is seeking City Council approval for the procurement of a 2027 Ford F250 4x4 pickup truck for the replacement of the Parks Department vehicle #6323 in the amount of $80,600.00, including taxes and accessories. Vehicle #6323 is a 2006 GMC Sierra 2500 Pickup and is recommended for replacement in 2026 to maintain the department’s operational effectiveness. Through the City’s membership in the Washington State Purchasing Cooperative, participating vendor Bud Clary Ford of Longview, WA, was selected from the cooperative vendors list, Contract No. 28423. Strategic Plan: This proposal directly aligns with Strategic Focus Area#4 – Infrastructure Development, Maintenance, and Connectivity. Funding: This vehicle replacement is identified in the 2026 budget (501-7630-594-6410) and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $80,600.00, including taxes and accessories. Recommendation: 1) Approve the purchase of a new Parks Department 2027 Ford F250 4x4 Pickup that is the functional equivalent of existing vehicle #6323, in an amount not to exceed $80,600.00, including taxes and accessories, and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary, and 3) authorize the City Manager to surplus vehicle #6323 and to dispose of the vehicle in a commercially reasonable manner, upon addition of the new vehicle to the City fleet. November 4, 2026 E - 23 Pricing from the Washington State Purchasing Cooperative contract is summarized below: Attachment(s): None Photo provided for reference. New Vehicle Type Vehicle Budget WSPC Bid Accessories Replacing Vehicle 2027 Ford F250 4x4 Pickup Truck $80,600.00 $76,215.48 $4,384.52 #6323, 2006 GMC Sierra 2500 Pickup Budget Amendment $0 Total Cost $80,600.00 November 4, 2026 E - 24 Date: November 4, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Equipment Purchase – Replacement of Parks Department Equipment #6321 Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: The Parks Department equipment #6321 is 20 years old, with over 2,200 hours of operation, and has accrued $9,600.54 in repairs and maintenance. To maintain operational effectiveness, it is necessary to replace this piece of equipment at this time as it is now beyond its fiscally responsible service life. It will be replaced by a 2027 John Deere Gator. This purchase furthers Equipment Services efforts to consolidate and streamline the fleet, while following Green Fleet requirements. Funding Overview: This equipment replacement is identified in the 2026 budget (501-7630-594-6410), and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $15,500.00, including taxes and accessories. Pricing from the Sourcewell Purchasing Cooperative contract is summarized below: Summary: Staff is seeking City Council approval for the procurement of a 2027 John Deere Gator for the replacement of the Parks Department equipment #6321 in the amount of $14,695.92, including taxes and accessories. Equipment #6321 is a 2006 John Deere Gator. It is recommended for replacement in 2026 to maintain the department’s operational effectiveness. Through the City’s membership in the Sourcewell Purchasing Cooperative, participating vendor Pacific Golf and Turf LLC of Snohomish, WA, was selected from the cooperative vendors list, Contract No. 112624-DAC. Funding: This equipment replacement is identified in the 2026 budget (501-7630-594-6410), and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $15,500.00, including taxes and accessories. Recommendation: 1) Approve the purchase of a new Parks Department 2027 John Deere Gator that is the functional equivalent of existing equipment #6321, in an amount not to exceed $14,695.92, including taxes and accessories, and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary, and 3)authorize the City Manager to surplus equipment #6321 and to dispose of the equipment in a commercially reasonable manner, upon addition of the new equipment to the City fleet. November 4, 2026 E - 25 Attachment(s): None Photo provided for reference. New Equipment Type Equipment Budget Sourcewell Bid Accessories Replacing Equipment 2027 John Deere Gator $15,500.00 $12,195.92 $2,500.00 #6321, 2006 John Deere Gator Budget Amendment $0 Total Cost $14,695.92 November 4, 2026 E - 26 1 Date: November 4, 2026 To: City Council From: Brian S. Smith, Police Chief Subject: Night Vision Equipment Purchase Relationship with the Strategic Plan: The proposed equipment purchase aligns with Strategic Focus Area #2 - Citywide Resource Optimization. Upgrading the PAPD night vision equipment improves the capacity of our staff as specially trained and equipped with advanced resources. Background / Analysis: The safety of our personnel and the public during high risk, low frequency incidents rely on a cadre of well trained and well-equipped personnel. It is especially important that, during periods of darkness, staff assigned to high-risk incidents are equipped with tools and technology that allow them to see clearly and identify suspects and potential threats. During an active shooter incident in Port Angeles on November 2025, most of the CRT members who deployed to a wooded ravine and searched for the suspect did not have suitable night vision equipment available to them. PAPD since has replaced some of the night vision equipment via the Stonegarden 24 grant program. A portion of the night vision equipment owned by PAPD remains over 15 years old and is not configured to be carried or deployed by tactical team members. The proposed equipment purchase will outfit the balance of PAPD CRT members Summary: The Port Angeles Police Department (PAPD) has personnel assigned to the interagency Crisis Response Team (CRT). The CRT assignment involves agency personnel utilizing specialized training and equipment in high-risk situations. The ability for CRT personnel to see clearly during periods of darkness is important for safety and mission success. The night vision equipment available to PAPD personnel is dated and not configured for use during a tactical operation. The WA State Department of Military has authorized the purchase of specialized and modern night vision binoculars for PAPD from the FY25 Stonegarden Grant Program. The equipment to be purchased is from a sole source provider and configured for tactical operations. The FY25 Stonegarden Grant for PAPD has been previously accepted by City Council. The Clallam County Sheriff’s Office is the sub-recipient and grant administrator. Strategic Plan: The proposed equipment purchase aligns with Strategic Focus Area #2 - Citywide Resource Optimization. Upgrading the PAPD night vision equipment improves the capacity of our staff as specially trained and equipped with advanced resources. Funding: Funding in the amount of $44,000 is available through the FY25 Stonegarden Grant Program There is no local match requirement. The Police Department revenue and expense lines will be adjusted via Budget Amendment #1 to reflect the additional revenue and expense. Recommendation: Authorize the purchase of five sets of night vision goggles, and the associated training from War Hammar Armaments in an amount not to exceed $40,395.00 plus applicable sales tax and allow the City Manager to make minor modifications. November 4, 2026 E - 27 2 with modern and suitable night vision equipment that improves their performance and improves the safety for all involved. Funding: Funding in the amount of $44,000 is available through the FY24 Stonegarden Grant Program There is no local match requirement. The Police Department revenue and expense lines will be adjusted via Budget Amendment #1 to reflect the additional revenue and expense. November 4, 2026 E - 28 1 Date: November 4, 2026 To: City Council From: Calvin W. Goings, Deputy City Manager Shannen Cartmel, CED Manager Ben Braudrick, Planning Supervisor Tim Hayes, Civil Engineer III Subject: Material Purchase: 5th & Peabody Signal Detection and Cabinet Equipment Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) identifies Strategic Focus Area #4 – Infrastructure, Development, Maintenance, and Connectivity. This focus area directs the City to improve connectivity between neighborhoods. This equipment purchase will provide upgraded detection, a new traffic signal cabinet that provides adequate space for modern equipment, and battery backup equipment that will allow the signal to run in the event of power loss. This equipment upgrade will restore functionality, improve resilience, and prepare this location for future interconnection. Background / Analysis: Currently, there are multiple types of signal controllers and detection equipment at City-operated signals. Many controllers and other equipment have exceeded their expected life expectancy. Upgrading all equipment to a similar type allows greater resilience, reduces the need for multiple types of equipment backup, and allows for interconnection which improves signal monitoring and performance. Project TR1399 Traffic Signal Interconnect and Preemption is included in the 2027-2032 adopted Capital Summary: Staff is seeking City Council approval for the procurement of traffic signal equipment to replace nonfunctioning signal detection equipment and the associated cabinet at the intersection of 5th and Peabody. Through the City’s membership with WSDOES (Washington State Department of Enterprise Services), participating distributor Western Systems Inc. of Everett, WA, was selected from the vendor list, Contract No. 29023 for equipment purchase in the amount of $69,130.28, including applicable taxes. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4 – Infrastructure, Development, Maintenance, and Connectivity. Funding: Funding is in the approved 2027-2032 Capital Facilities Plan Project TR1399 for budget (312- 7930-595.6510) in the amount of $69,130.28, including applicable taxes. Recommendation: 1) Award a contract with Western Systems Inc. through the WSDOES cooperative purchasing agreement #29023, for traffic signal equipment at a price of $69,130.28 including sales tax, and 2) authorize the City Manager or their designee to execute all contract-related documents, to administer the contract, and to make minor modifications to the contract as necessary. November 4, 2026 E - 29 2 Facilities Plan and includes funding for these equipment upgrades and adequate backup equipment. Vehicle detection at the intersection of 5th and Peabody is currently non-functional and has been identified by staff as the highest priority replacement. Additionally, this purchase will allow this upgrade to be completed while ADA upgrades associated with TR0716 - ADA Peabody are being completed. The City is able to utilize the contract awarded by WSDOES to save time, obtain better prices, and better contract terms. Pricing from the WSDOES Purchasing contract is summarized below: Vendor Description Total Price Western Systems, Inc. Illumination, Traffic Signal and ITS Equipment $63,521.38 Sales Tax 8.9% $5,608.90 Total $69,130.28 Funding Overview: Funding is in the approved 2027-2032 Capital Facilities Plan Project TR1399 for budget (312-7930-595.6510) in the amount of $69,130.28, including applicable taxes. Attachment(s): 1. Western Systems Quote November 4, 2026 E - 30 1 of 3 Quotation 1122 Industry Street, Bldg. B, Everett, WA 98203 Phone: (425) 438-1133 | Fax: (425) 438-1585 Date Quote #Rev # 10/23/26 Q-25807 Project Agency: 5th and Peabody City of Port Angeles, WA Prepared For:To place an order: Contact:Phone: Contact:Andrew Colleran Company:City of Port Angeles, WA Phone:0 Email:Fax:(425)438-1585 Address:321 E 5th Street Email:acolleran@westernsystems-inc.com City/State:Port Angeles, Washington 98362 *This order is subject to the terms & conditions Qty Part #Description Unit Price Ext. Price 1 3012500000 ENCLOSURE TYPE P+ (UL) RS HANDLE (F) RH SOCKET (S) (UNFINISHED)$3,531.36 $3,531.36 1 2510012610 CONTROLLER CABINET (TS2-1); PORT ANGELES TYPE P+ DLS 32CH (ALPHA) 2024 $16,710.18 $16,710.18 1 5070070251 POWER SUPPLY (EDI-WS) PS250-WS, SHELF MOUNT 5A GREEN $528.51 $528.51 1 5060050711 BUS INTERFACE UNIT (EDI) BIU-700H-WS, 1/2 WIDTH, GREEN $314.85 $314.85 4 5060050711 BUS INTERFACE UNIT (EDI) BIU-700H-WS, 1/2 WIDTH, GREEN $314.85 $1,259.40 8 5020010800 LOAD SWITCH, DUAL CHANNEL (WESTERN SYSTEMS) SSS-216, W/IO INDICATORS $158.29 $1,266.32 1 5030020500 FLASHER, DUAL CHANNEL (WESTERN SYSTEMS) SSF- 216, W/IO INDICATORS $201.35 $201.35 8 5040040500 FLASHER TRANSFER RELAY, MINI (WESTERN SYSTEMS) FTR-216, 21BXHL-120VAC $61.60 $492.80 1 8025015000 AUTOMATIC TRANSFER SWITCH ASSEMBLY (ALPHA) 020- 168-25, 19" RM, W/SURGE, UATS, RECEPTACLES 120VAC $927.73 $927.73 1 8025095500 REMOTE BATTERY MGMT SYSTEM, RBMS (ALPHA) 0370260-002, CONTROLLER, (4) SENSOR CABLES, (1) CAT5E CABLE, (4) BS3B-12-4-EQ SENSORS $912.02 $912.02 1 8025050032 BATTERY CABLE HARNESS KIT (ALPHA) 740-628-32, 48V, 8FT, 1/4-20 TERM W/13IN BLK EXT (334/P+)$329.32 $329.32 4 8025040085 BATTERY, ALPHACELL (ALPHA) 240XTV, 1810229, 12V, 112AH / 75LB $425.49 $1,701.96 1 9780010000 ONSITE TURN-ON ASSISTANCE (WESTERN SYSTEMS)$1,545.45 $1,545.45 Attachment 1 November 4, 2026 E - 31 2 of 3 1 5460050562 OPTICAL SIGNAL PROCESSOR (TOMAR) OSPOCWV2-4, 4- CHANNEL, 2 SLOT, W/LOGGING, ETHERNET, & CONF. LIGHT $3,747.14 $3,747.14 1 Currux Camera Bundle Currux Camera Bundle - bullet and dome cameras $0.00 $0.00 1 8820080003 SMARTCITY ITS STANDARD, GEN 3, (CURRUX VISION) CVAIS G3, 6 PORT, GPU SERVER & SOFTWARE $17,912.85 $17,912.85 1 8820080023 SDLC MODULE, SERIAL VEH/PED/BIKE DETECTION (CURRUX VISION) SDLC $1,088.89 $1,088.89 1 8820080025 NTCIP MODULE (CURRUX VISION) NTCIP $1,088.89 $1,088.89 4 5900001002 CURRUX BULLET CAMERA SINGLE BUNDLE (1 CAMERA)$1,915.12 $7,660.48 4 7510010385 ASTRO-BRAC (STELLAR) CAMERA MOUNT (PELCO PRODUCTS) AS-0175-74-84-PNC, 74" TUBE, 84" STAINLESS CABLE (UNFINISHED) $282.58 $1,130.32 1 6399992200 5-PORT INDUSTRIAL FAST ETH/POEDIN-RAIL SWITCH, 4X FAST ETH POE, 1XFAST ETH PORT (TRENDNET TI-PE50)$145.23 $145.23 1 0130030067 POWER SUPPLY (MEAN WELL) SDR-120-48, 88-264VAC, 48VDC / 2.5A OUT, DIN-RAIL $92.95 $92.95 4 6660010485 PATCH CORD CAT6, EXTREME CAT 6 SLIMLINE BOOT, 5FT BLUE $17.19 $68.76 1 2100000001 SUB-ASSEMBLY 2140 TOMAR PANEL SYSTEM INSTALLATION (NEMA CABINET) 2024 $93.37 $93.37 1 5460050572 OPTICALLY ISOLATED 8 PHASE GREEN MONITOR (TOMAR) 2140-GPMON $271.25 $271.25 1 0000029023 WSDOES CONTRACT #29023, ILLUMINATION TRAFFIC SIGNALS, ITS EQUIPMENT & PARTS 2025 $0.00 $0.00 Terms:Net 30 Subtotal $63,021.38 Freight Terms:FOB DESTINATION Shipping $500.00 Material Lead Time:Tax 8.90%$5,608.90 See General Conditions below for exceptions and changes to freight and lead time policies Grand Total $69,130.28 Attachment 1 November 4, 2026 E - 32 3 of 3 GENERAL CONDITIONS OF SALE All information contained within this quote is valid for 30 days from the date of the quotation. Thereafter, all prices and applicable charges are subject to change; if the purchaser accepts this quote after 30 days, Western Systems may issue a revised quote with the 30 days following receipt of the acceptance. The acceptance of this quotation constitutes the acceptance of the following terms and conditions which cannot be varied or waived except by express written authorization by a Western Systems representative. These terms govern the sale of goods and services supplied by Western Systems. Differing terms from Buyer in any purchase order or written communication shall not be binding on Western Systems absent its written agreement to any such terms. Purchaser’s acceptance of the goods and/or services referenced in this quote also constitute acceptance of all terms and conditions herein, regardless of any contrary or additional terms submitted in purchaser’s purchase order or acceptance. TERMS AND CONDITIONS Purchase Order: All purchases require a written purchase order. Email or verbal communication does not constitute an acceptable purchase order. Delivery: Material lead time date is based after the release of the order. FOB Destination and FOB Destination, Prepay & Add terms as quoted imply that the customer will be available to receive material deliveries. Any repeated delivery attempts, trucking reroutes, enroute cancellations or product factory returns which incur additional shipping costs shall be billed to the purchaser. This quote is based on the current prices being paid by Western Systems for parts and components. It assumes delivery within a normal time frame after acceptance (in any case within 90 days). If delivery is delayed or postponed beyond normal delivery time frames at no fault of Western Systems, it reserves the right to adjust the pricing based on its estimate of increased costs and expenses resulting from the delay, unless contractually obligated otherwise or contrary to applicable law, Taxes/Fees: Unless current resale certificate is on file with Western Systems, purchaser shall be responsible for all tariffs, duties, sales or use taxes in addition to the quoted prices herein. Any taxes listed are estimated totals and should be verified against local requirements. Payment Terms: Payment terms are based on approval of credit. If credit is approved, terms are Net 30 days. Western Systems imposes a surcharge of 3% on the transaction amounts when paying with a Visa or MasterCard. We are unable to accept other credit cards for payment options. All prices are quotes in USD funds. Non-Payment Fees: If payment has not been received when due, the purchaser will be considered in default. Western Systems will be entitled, without prejudice to our other rights, without serving notice of default, to charge the purchaser for all costs incurred such as administration, storage, legal fees, etc. The unpaid portion of any amount due to Western Systems will bear interest at the rate of 1.5% per month simple interest. Western Systems reserves the right to hold goods until purchaser balances their account. Western Systems will not be subject to any project retainage of any kind. Material purchases are due and payable upon receipt. Unpaid balances will be subject to Non-Payment Fees. Collections: Upon Buyer default of these terms, Western Systems may, in addition to any other rights or remedies at contract or law, declare the entire balance of purchaser’s account immediately due and payable. If unpaid balance is referred for collections, Buyer agrees to pay Western Systems, to the extent permitted by law, reasonable attorney fees in addition to all damages otherwise available, plus any court costs or expenses incurred by Western Systems, plus any finance charges accrued on any unpaid balance owed by Purchaser. Deferment or Cancellation Policy: Order deferment or cancellation once materials have been released will be subject to cancellation and/or restocking fees. Documentation: Any operational documentation supplied as a part of this quotation remains the property of Western Systems and may not be copied, reproduced, transmitted, or communicated to 3rd parties without the express written consent of Western Systems. On-Site Services: On-site services such as signal or video system turn-on support shall be scheduled three weeks in advance. If services need to be cancelled or postponed, any non-reimbursable travel expenses will be billed to purchaser. This quotation does not include nor imply any on-site support services unless expressly stated herein. If on-site support services are required, and not included as part of this proposed scope of work, please contact Western Systems for a revised quotation. Warranty: Products are sold subject to manufacturer’s warranty. Products manufactured by Western Systems carry a one-year warranty. For additional information on Western Systems warranty, please send an email to info@westernsystems-inc.com. Return and Restocking Policy: Western Systems will be the sole source in determining whether any item is eligible for return. To be eligible the item(s) must be standard product models, new and unused, in the original packaging, and invoiced within the last 90 days. Restocking fees are applied to all returns and can vary between 20-50% based on annual sales activity. In no case will Western Systems be obligated to take returns for items that are obsolete, custom orders, or past the 90-day invoice period. Delivery Inspection: All materials deliveries must be inspected upon receipt from freight carrier. Any freight damages must be reported to the carrier at the time of receipt of goods. Any materials shortages or inaccuracies in shipment must be reported to Western Systems within ten days receipt of goods. Thereafter, any discrepancies will be considered incidental and the responsibility of the receiver. Force Majeure: Western Systems, Inc. shall in no event be responsible for delays in performance due to actions beyond its reasonable control including without limitation acts of God, strikes, supply chain interruptions or delays, labor shortage or disturbance, fire, accident, war, civil disturbance, or carrier delays. Western Systems, Inc. accepts no liability for errors or omissions or the accuracy or the completeness of this quotation. It has been prepared to the best of our knowledge per plans, specifications, documentation, and communications provided but we do not guarantee these to be accurate or of the latest revision. Determination of accuracy of this quotation and final quantities are the sole responsibility of recipient. Western Systems, Inc. shall in no event be liable for any special, consequential, incidental, or liquidated damages (including without limitation damages for loss of use of facilities or equipment, loss of revenue, loss of profits or loss of goodwill), regardless of whether it (a) has been informed of the possibility of such damages or (b) is negligent. Attachment 1 November 4, 2026 E - 33 Date: November 4, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Class B Biosolids Hauling – Change Order No. 03 SVC-2025-54 Relationship to Strategic Plan: The 2025 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This contract directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: The City entered into a service agreement SVC-2025-54 with Tenelco Inc. in January 2026 for disposal of biosolids through an approved beneficial use as required by state and federal regulations. Biosolids are generated at the WWTP as a by-product of the biological treatment process that cleans wastewater. The plant typically produces approximately 30 tons per week. Tenelco Inc. transports and land applies the biosolids on their permitted properties in Douglas County, Washington. Change order No. 1 was a no cost contract clarification modification and Change order No. 2 was for a time extension for an additional year. Due to increased load hauling and fuel costs in 2026, Change Order No. 03 is necessary to cover the increased costs of service for the remainder of 2026. Funding Overview: Funding is available in the amount of $40,000.00 in the 2026 Wastewater professional services budget (403-7480-535-4150) from savings expected in the 2026 year. Attachment(s): SVC-2025-54 Change Order No. 03 Summary: On January 20, 2026, City Council awarded a service contract, SVC-2025-54, to Tenelco, Inc. to transport Class B Biosolids from the City Wastewater Treatment Plant (WWTP) to their permitted properties for soil nutrients in the not to exceed contract amount of $220,500.00. Staff is seeking City Council approval of Change Order No. 03 amending and increasing the contract value by $40,000.00 to a new not to exceed amount of $260,500.00 to cover the increased cost of service for the remainder of 2026. Strategic Plan: This contract directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Funding: Funding is available in the amount of $40,000.00 in the 2026 Wastewater professional services budget (403-7480-535-4150) from savings expected in the 2026 year. Recommendation: 1) Approve Change Order No. 03 to Service Contract SVC-2025-54 amending and increasing the contract value by $40,000.00 to a new not to exceed value of $260,500.00, and 2) authorize the City Manager to sign all contract-related documents, to administer the contract, and to make minor modifications as necessary. November 4, 2026 E - 34 City of Port Angeles Public Works Department 321 East 5th Street / Port Angeles, WA 98362 CONTRACT CHANGE ORDER Contract No. & Title SVC-2025-54 Class B Biosolids Transportation & Beneficial Use Services Project Manager: Tyler White Date Prepared 10/28/2026 Change Order No. 03 Prime: Tenelco, Inc. Change Title: 2026 Budget Increase Change Scope / Justification: Current performance period ending December 31, 2026, total budget of $220,500, needs increased by $40,000 to cover the cost of hauling and beneficial use services for the remainder of 2026. COST DATA CONTRACT AMOUNT SCHEDULE Original Contract $220,500 Original Substantial Completion 12/31/2026 Previous Change Orders $0 Previous Time Extension by Change Order* This Change Order Amount (including applicable taxes) $40,000 Suspension of Work (days) N/A New Contract Amount $260,500 New Substantial Completion 12/31/2026 CONTRACTOR: Tenelco Inc. CITY OF PORT ANGELES Signature Signature Cindy Eldredge Office Manager Nathan West City Manager Date: Date: This Change Proposal shall represent full and complete compensation and final settlement of all Claims for all (1) time; (2) direct, indirect, and overhead costs; (3) profit; and (4) costs or damages associated with delay, inconvenience, disruption of schedule, impact, ripple effect, loss of efficiency or productivity, acceleration of work, lost profits, and/or any other costs or damages related to any work either covered or affected by the Change Proposal, or related to the events giving rise to the Change Proposal. November 4, 2026 E - 35 Date: November 4, 2026 To: City Council From: Nathan A. West, City Manager Subject: National League of Cities Voting Delegate Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #4, specifically Goal C, Improve public safety and peace of mind in our community while promoting policies that create efficient practices, Measure #3, Reduce unfunded mandates/barriers for state funding through annual adoption of legislative priorities. Background / Analysis: The National League of Cities Annual Business Meeting will take place on Saturday, November 21. The deadline to register voting delegates is Friday, November 20. Each member city shall designate one voting delegate and may designate one alternate voting delegate. Funding Overview: NA Attachment: None. Summary: This year Mayor Dexter will participate in the National League of Cities Annual Business Meeting and needs to be appointed as the City’s voting delegate. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4, specifically Goal C, Improve public safety and peace of mind in our community while promoting policies that create efficient practices, Measure #3, Reduce unfunded mandates/barriers for state funding through annual adoption of legislative priorities. Funding: NA Recommendation: Appoint Mayor Dexter as the City’s delegate to vote at the National League of Cities Annual Business Meeting. November 4, 2026 E - 36 Date: November 4, 2026 To: City Council From: Nathan A. West, City Manager Sheida R. Sahandy, City Attorney Subject: Western Port Angeles Harbor Alternative Dispute Resolution Agreement Background / Analysis: In 2012, the Washington Department of Ecology (DOE) informed the City that it is one of several PLPs under the State’s Model Toxics Control Act (MTCA) for some portion of the contamination in the WPAH Site. Six PLPs have been engaged in the regulatory process to investigate and develop a suitable remedial plan for the WPAH Site. They have shared in the costs of that work. In 2013, the City and other entities named as PLPs entered into a Participation Agreement. Among other things, the Participation Agreement (and associated agreements) provided that the participating entities would combine their resources to prepare an RI/FS required under an Agreed Order with DOE as part of the cleanup process for the WPAH Site. Under MTCA, the next step was for the willing PLPs to enter into a consent decree (CD) with Ecology, which obligated the PLPs to fund and perform the remedial design and cleanup of the Site. To enable the work parties to cooperate in implementing the cleanup under the CD, they entered into an agreement that defines their respective rights and obligations and included a provisional cost-sharing agreement. The next step now is for the PLPs to undergo a process, mediated by a neutral third party, that helps with the determination of relative responsibility for the contamination of each of the PLPs. The PLPs have participated in extensive and detailed negotiations to determine the details of these processes now Summary: City Council is being asked to approve an Alternative Dispute Resolution Agreement (ADR Agreement) relating to the environmental remediation work at the Western Port Angeles Harbor (WPAH) Site. The ADR Agreement describes in detail the process that will be used for an equitable allocation of responsibility for the remediation. Funding: The City is currently required, along with the other five potentially liable parties (PLSs), to pay an equal share (16.67%) of the expenses and fees of consultants and contractors to design and construct the remedy at the WPAH Site. This ADR process is one of the steps for the City to seek to obtain a reallocation of costs in accordance with its equitable share of responsibility. We anticipate that the expenses incurred for these processes will be reimbursed by insurance, except for amounts paid to outside attorneys, which will be partially reimbursed by insurance, as has been true for the duration of the cleanup to date. Recommendation: 1)Approve and authorize the City Manager to execute on behalf of the City the WPAH ADR Agreement; 2) to make minor modifications and amendments to the ADR Agreement as needed over time; and 3) to administer the ADR Agreement throughout its duration. November 4, 2026 E - 37 captured in the proposed ADR Agreement. This is a critical step as it will lead to the reallocation of costs and responsibilities both historically and moving forward. Recommendation: Outside expert counsel has been representing the City in this matter and recommends approval and authorization to enter the ADR Agreement, which is an essential step in the remediation process. It is currently anticipated that all 6 PLPs are going to approve the ADR Agreement and agree to participate based on the terms provided therein. Funding: This ADR process is one of the steps for the City to seek to obtain a reallocation of costs in accordance with its equitable share or responsibility. We anticipate that the expenses incurred for these processes will be reimbursed by insurance, except for amounts paid to outside attorneys, which will be partially reimbursed by insurance, as has been true for the duration of the cleanup to date. Attachments: Exhibit A: WPAH ADR Agreement November 4, 2026 E - 38 ALTERNATIVE DISPUTE RESOLUTION MEMORANDUM OF AGREEMENT October 7, 2026 November 4, 2026 E - 39 2 THIS ALTERNATIVE DISPUTE RESOLUTION MEMORANDUM OF AGREEMENT (“Agreement”) is made and entered into by and among a subset of potentially liable parties (“PLPs”) to the Western Port Angeles Harbor (“WPAH”) Site: Port of Port Angeles (“Port”); City of Port Angeles (“City”); Nippon Paper Industries USA Co., Ltd. (“NPIUSA”); Merrill & Ring, Inc. (“M&R”); Georgia-Pacific LLC (“GP”); and Owens Corning, Inc. (“OC”) (individually a “Party” and collectively, “Parties”), each of whom are signatories to this Agreement. The Parties seek to enter into an agreement to conduct alternative dispute resolution (“ADR”) with the objective of achieving a binding global settlement to resolve their respective liability as Potentially Liable Parties (“PLPs”) at the Western Port Angeles Harbor Site (“Site”). In consideration of the terms of this Agreement, the Parties mutually agree as follows: 1. RECITALS 1.1. The Parties have shared remedial action costs for the Site subject to a 2013 Participation Agreement and a 2025 Provisional Funding Agreement, subject to a final reallocation; 1.2. The Parties now wish to participate in confidential ADR to reach a global agreement on each Party’s share of remedial action costs for the Site; 1.3. The Parties intend to engage a qualified Neutral to assist the Parties in conducting the ADR Processes; and 1.4. The ADR Processes described in this Agreement are confidential and are being performed pursuant to Washington’s Uniform Mediation Act, RCW Ch. 7.07, and shall be considered a mediation that is covered by RCW 42.56.600. 2. DEFINITIONS As used in this Agreement, the following defined terms have the meanings indicated below, which definitions shall control and take precedence, for purposes of interpreting this Agreement. Each defined term used in this Agreement shall have a comparable meaning when used in its plural or singular form. 2.1. “ADR Calendar” means the schedule of ADR Processes included as Exhibit A to this Agreement. The ADR Calendar may be modified only by the written agreement of all Parties, except as modified by the Neutral in accordance with this Agreement. 2.2. “ADR Process(es)” means the procedures and processes described in Section 4 of this Agreement. November 4, 2026 E - 40 3 2.3. “Agreement” means this document and its attachments which may be amended by the Parties. 2.4. “Confidential ADR Materials” means any and all privileged and confidential materials prepared specifically for the ADR Processes, including documents and communications submitted to the Neutral or exchanged among the Parties for purposes of ADR. 2.5. “Confidential Information” means any and all data and information (oral, written, or electronic) that is given to, obtained by, developed for/by, or communicated to/from the Neutral or the Parties as part of the ADR Processes including, without limitation: (1) data or information derived from meetings, telephone calls or conversations with individual Parties or their legal or technical representatives; (2) studies, plans, documents, spreadsheets, reports, analyses, compilations, projections, notes, mailings, facsimile transmissions, emails, and / or memoranda given to or obtained by the Neutral; (3) any documents, communications, or mental impressions that Parties may disclose or transmit to each other, including through or by technical consultants retained by the WPAH Group or the Neutral, concerning the Site for the purposes of developing and/or negotiating a Sitewide Allocation and conducting the Mediations; (4) any notes, observations, or other materials that are developed, created, or obtained by the Neutral in connection with the Site or the ADR Processes; and (5) all opinions and work product of the Neutral shared with one or more Party or Parties. 2.5.1. Notwithstanding the foregoing, the term “Confidential Information” shall not include data or information that meets the following criteria (said criteria to be narrowly construed so as to give the greatest protection to said Confidential Information): (1) data or information that can be proven to have been in the possession of the Neutral as of the date of the Neutral Engagement Agreement, provided such possession did not occur by or through an unlawful act and/or by or through any other person or entity that had an obligation, duty or requirement to preserve the secrecy or confidentiality of such data or information; or (2) data or information that is in the public domain as of the Effective Date or thereafter enters the public domain without any act (or omission to act) on the part of the Neutral that is otherwise prohibited by this Agreement of the Neutral’s Engagement Agreement. 2.6. “Contaminants of Concern (COCs)” means the Indicator Hazardous Substances for the Site, which include cadmium, mercury, zinc, carcinogenic polycyclic aromatic hydrocarbons, polychlorinated biphenyls, and dioxins/furans (including without limitation pentachlorophenol and biocides, herbicides, and pesticides that may be sources of dioxins and/or furans). 2.7. “Contractual Issues” shall mean contractual issues and obligations among Parties arising from historical transactions and/or relationships. 2.8. “Decision Making” shall have the meaning described in Section 7.1 below. November 4, 2026 E - 41 4 2.9. “Document Repository” shall have the meaning described in Section 4.1.1 below. 2.10. “Effective Date” means the date when all Parties have executed this Agreement. 2.11. “Expert Report” shall have the meaning described in Section 4.2.2 below. 2.12. “Future Site Costs” means those costs associated with performing the obligations of the Consent Decree, which costs have not yet been incurred by any Party or are undefined or unknown prior to the Final Neutral’s Report; provided that the Neutral determines that any such costs would be subject to cost recovery or contribution under CERCLA or MTCA. 2.13. “Include,” “includes” and “including” shall be deemed to be followed by “without limitation” whether or not they are in fact followed by such words or words of like import. 2.14. “Joint Submission Documents” means those documents and materials related to the WPAH Site and the work that has been done or expected to be done by the WPAH Group that the Parties determine shall be added to the Document Repository, subject to the Confidentiality provisions in Section 6 below. 2.15. “Neutral” means the individual or entity selected by the Parties to serve as the Neutral under this Agreement, together with their employees, and any outside consultants or contractors engaged by the Neutral to support the performance of the services described in this Agreement, who collectively perform such services on behalf of the Neutral. 2.16. “Neutral Engagement Agreement” means the engagement agreement(s) the Parties have or will execute with the Neutral to support the ADR Processes on behalf of the Parties. 2.17. “Neutral’s Fees and Costs” shall mean the fees and costs invoiced by the Neutral to the Parties consistent with the Neutral’s Engagement Agreement. 2.18. “Neutral’s Report” “Draft Neutral’s Report” and “Final Neutral’s Report” have the meanings described in Section 4.4. 2.19. “Neutral’s Additional Information Requests” shall have the meaning described in Section 4.4.2. 2.20. “Past Site Costs” means the costs incurred by the WPAH Group prior to the Effective Date pursuant to the April 14, 2013 Participation Agreement for the Western Port Angeles Harbor, the Interim Cooperation Agreement for Western Port Angeles Harbor, and the August 29, 2025 Provisional Cost Sharing and Cooperating Agreement for the Western Port Angeles Harbor. It shall not include Parties’ individual attorneys’ fees, consultant fees, or other costs incurred as a result of their participation in the WPAH Group or at the Site. November 4, 2026 E - 42 5 2.21. “PLP” means Potentially Liable Party as defined by MTCA. 2.22. “Position Paper” shall have the meaning described in Section 4.2.3. 2.23. “Parties’ Requests for Additional Information” shall have the meaning described in Section 4.1.4. 2.24. “Rebuttal Evidence” shall have the meaning described in Section 4.1.3.3. 2.25. “Required Party Disclosures” shall mean the documents described in Section 4.1.3.1. 2.26. “Shall” and “will” mean “must” and shall and will have equal force and effect and express an obligation. 2.27. “Sitewide Allocation” means the Neutral’s non-binding recommended fair and equitable allocation of Past Site Costs and Future Site Costs based on: (1) application of legal and equitable factors under CERCLA and MTCA and any other applicable law that, in the judgment of the Neutral, are appropriate and that would be considered by a court in allocating costs for the Site; (2) evaluation of the Confidential Information, and (3) the Neutral’s experience and expertise. 2.28. “Summary Disclosure Statement” has the meaning set forth in Section 4.1.5 below. 2.29. “Supplemental Written Submissions” has the meaning described in Section 4.3.2. 2.30. “Termination” and “Early Termination” shall have the respective meanings described in Section 5.2. 2.31. “Western Port Angeles Harbor Site” or “Site” means the Western Port Angeles Harbor Site as defined in the Consent Decree. 2.32. “Withdrawal” shall have the meaning described in Section 5.3. 2.33. “WPAH Group” means the Port, the City, GP, NPIUSA, M&R, and OC, as organized under the April 14, 2013 Participation Agreement for the Western Port Angeles Harbor, the Interim Cooperation Agreement for Western Port Angeles Harbor, and the August 29, 2025 Provisional Cost Sharing and Cooperating Agreement for the Western Port Angeles Harbor. 2.34. “Writing” or “Written” means communication in writing including communications made by email. November 4, 2026 E - 43 6 3. THE NEUTRAL 3.1. No later than 60 days after the Effective Date, the Parties will enter into a contract with the Neutral to perform the services under this Agreement. If the Parties are unable to finalize a contract with the Neutral within 60 days, the Parties shall promptly meet and confer to resolve any outstanding issues and shall finalize such contract within 90 days of the Effective Date. 3.2. Each Party acknowledges that (1) the Neutral is performing services under this Agreement as an impartial neutral, and (2) the Neutral is not representing or acting as counsel or a consultant for any Party, nor will they do so prior to the Termination of this Agreement except as provided below. 3.3. The Parties will engage the Neutral with the understanding that the Neutral does not have a conflict of interest and the understanding that there is no existing basis for disqualification of the Neutral. The Neutral shall disclose any prior engagements or co-counseling arrangements with the Parties and their counsel prior to selection as the Neutral. The Neutral shall also disclose any financial, personal, or professional relationships with any Party, its counsel, or its consultants that could reasonably create an appearance of partiality. The Neutral shall not accept any future engagement with a Party or its counsel during the term of this Agreement unless it has first obtained a written conflict waiver from the WPAH Group, which waiver must be unanimously approved by the Parties. 3.4. The Neutral will handle all Confidential Information so as to maximize the application of all available legal rights and privileges against disclosure and admissibility including, without limitation, the protections that are set forth under state and federal law, including: Washington’s Uniform Mediation Act, RCW Ch. 7.07, Washington Rule of Evidence 408, Federal Rule of Evidence 408, and common interest privileges and protections, and subject to the terms and limitations in the Confidentiality provisions in Section 6 below. 3.5. The Neutral’s Fees and Costs are subject to the terms and conditions of the Neutral Engagement Agreement. The Parties agree to pay the Neutral’s Fees and Costs on an equal per- capita basis, except as provided in Sections 4.3.1.5, 4.3.2.2, and 5.3. 3.6. The Neutral will stop all work upon receipt of Notice of Termination as defined in Section 5 below. November 4, 2026 E - 44 7 4. ADR PROCESSES 4.1. Phase 1: Information Exchange 4.1.1. The Document Repository 4.1.1.1. The Parties intend to share information, subject to the confidentiality provisions set forth in Section 6 below, to ensure that all Parties have access to the available and relevant historical information concerning each Party’s nexus to the Site. 4.1.1.2. The Port, the City, GP, and OC previously engaged Espy to host a document repository as part of earlier mediation efforts. This document repository, containing historical records collected and shared by the parties to that mediation—but not confidential mediation materials prepared specifically for the mediation—shall be the foundation for the Document Repository. All Parties to this Agreement shall add additional documents to the Document Repository in accordance with this Agreement and the ADR Calendar. 4.1.1.3. NPIUSA and M&R shall begin upload of its Required Party Disclosures under Section 4.1.3 no later than 10 days after the Effective Date, and will receive access to the Document Repository according to the ADR Calendar. From that point forward, the Document Repository will be available to all Parties and the Neutral at all times except as provided in Sections 5.2 and 5.3. 4.1.1.4. Except for documents related to Contractual Issues, all documents exchanged and disclosed between the Parties and/or the Neutral, including copies of all substantive communications with the Neutral will be uploaded to and kept in the Document Repository. 4.1.1.5. The Parties will share equally in the costs of maintaining the Document Repository. 4.1.1.6. When uploading documents, the Parties shall use best efforts to identify the following codes for each document on an Excel spreadsheet or arrange for Espy to provide the codes: name or title of document, author, recipient, date, type of document. In the event a Party requests that Espy code its documents, Espy shall separately bill that Party for that work. November 4, 2026 E - 45 8 4.1.2. Group Joint Submission Documents 4.1.2.1. No later than the deadline stated on the ADR Calendar, the Port shall upload to the Document Repository an updated accounting of the WPAH Group costs incurred to date, together with any information necessary for the other Parties and/or the Neutral to evaluate the Past Site Costs. 4.1.2.2. No later than the deadline stated on the ADR Calendar, the Parties shall meet and confer to finalize their unanimous agreement on additional Joint Submission Documents that will be added to the Document Repository, which shall be confirmed in writing by all Parties prior to their upload. Within 7 days of the Parties’ written confirmation of agreement, the WPAH Group will upload the Joint Submission Documents to the Document Repository. 4.1.2.3. Within 7 days of submission of any remedial design deliverables to Ecology required under the Consent Decree, the WPAH Group will upload a copy of any such deliverable to the Document Repository. 4.1.3. Required Party Disclosures 4.1.3.1. Each Party must upload to the Document Repository its Required Party Disclosures, which is defined to include: (i) any documents that Party will cite, refer to, or rely upon in the ADR Processes and (ii) any non-attorney client privileged and non-attorney work product privileged documents that include the following information for that Party’s facility or facilities located at the Site: a) diagrams, maps, site plans, or photographs showing building or infrastructure layout, including overwater structures (creosote piles, docks, and wharves), floor drains, waste storage and disposal locations, hog fuel boilers, waste treatment systems, septic tanks, storm drain systems, and public and private outfalls (and how such features changed over time); b) information regarding operations conducted at each property (e.g., disclosing the equipment, processes, materials, products, chemicals, hazardous substances, wastewater, or activities at each property); c) information describing the upland or in-water use, discharge, investigation, dredge, filling, or remediation of materials containing any COC identified in Exhibit B, including environmental reports, technical memoranda, permits and related documents, and correspondence; November 4, 2026 E - 46 9 d) in addition to information related to any COC identified in Exhibit B (as described immediately above), any other information bearing on any release of process wastes, wastewater, or other contaminant discharge with a pathway into the WPAH (e.g., information regarding ground-water and in-water discharges (whether permitted or unpermitted), air emissions, in- water dredge and/or fill activities, land releases, or bank erosion); e) information regarding fines, violations, or penalties associated with the discharge of any hazardous substance; f) documents referenced or relied on in the Summary Disclosure; and g) information relevant to any asserted defense (including on matters of law, equity, and/or contract) or mitigating factors with respect to liability. 4.1.3.2. The Parties agree to act in good faith to search for and timely submit accurate and complete Required Party Disclosures as described in this section and will timely update their Required Party Disclosures on an ongoing basis with any documents that are newly created after the ADR Calendar deadline. The Parties will use good faith efforts to avoid submitting duplicate versions of the same document. The Parties shall give notice to all other Parties when uploading records to the Document Repository, including the general nature of the documents. All records uploaded to the Document Repository shall bear a Party signifier followed by a number sequence, according to normal legal convention. 4.1.3.3. Upload of the Required Party Disclosures to Espy may be completed on a rolling basis but shall be completed no later than the deadline stated on the ADR Calendar. Supplementation of the Document Repository shall be permitted after the Required Party Disclosures deadline in order to allow the Parties to upload rebuttal evidence (“Rebuttal Evidence”) related to the Required Party Disclosures in accordance with the Rebuttal Evidence Deadline set forth in the ADR Calendar; however, nothing in this sentence alters or modifies the Parties’ obligations pursuant to Section 4.1.3.1. Following such Rebuttal Evidence Deadline, no Party shall submit any additional Required Party Disclosures or Rebuttal Evidence except in response to a request for additional information under Sections 4.1.4, 4.3.3, 4.4.2, or pursuant to a majority written vote of the other Parties. November 4, 2026 E - 47 10 4.1.4. Parties’ Requests for Additional Information. 4.1.4.1. At any time prior to the deadline set in the ADR Calendar any Party may submit requests for additional information from any other Party to this Agreement, provided that follow-up requests for information are specific, reasonably non-burdensome, and clearly fall within the categories of information described in this Agreement (“Parties’ Requests for Additional Information”). Any dispute as to the Parties’ Requests for Additional Information shall be resolved by the Neutral. 4.1.5. Summary Disclosure Statements. 4.1.5.1. No later than the deadline set forth in the ADR Calendar, each Party will submit a Summary Disclosure Statement, based upon non-attorney-client privileged and non-attorney work-product privileged information, that identifies the following: all current or former ownership interests or operations at property in or adjacent to the WPAH Site; the names of all entities associated with each property; periods of ownership or operation; a description of operations conducted at each property; the equipment, processes, materials, products, or activities at each property that may have involved the use or release of any COC; and identifies any liability defenses to be asserted and known at the time of submission of the Summary Disclosures. 4.1.5.2. Summary Disclosure Statements may be modified after their initial submission; however, all such modifications must be completed in accordance with the ADR Calendar. 4.2. Phase 2: Advocacy Submissions 4.2.1. Role of the Neutral 4.2.1.1. The Neutral may convene a meeting of and/or request input from the Parties on the Parties’ recommendations as to the contents and length of the Expert Reports, Rebuttal Expert Reports, Position Papers, and Responses to Position Papers. 4.2.1.2. The Neutral shall provide written guidelines for the contents and length of the Expert Reports, Rebuttal Expert Reports, Position Papers, and Responses to Position Papers. The Parties shall follow the Neutral’s written guidance in good faith. November 4, 2026 E - 48 11 4.2.1.3. No later than 30 days after the deadline for submission of Position Papers identified on the ADR Calendar, the Neutral shall provide the Parties with a nonbinding cost estimate for preparation of the Neutral Report (“Report Budget”). Within 30 days of receipt of the Report Budget the Parties shall each provide advance payment of one-sixth of the Report Budget to the group account as described in the Neutral Engagement Agreement. Any discrepancies between the Report Budget and the actual cost of the Neutral Report shall be handled in accordance with the terms of the Neutral Engagement Agreement. 4.2.2. Expert Reports 4.2.2.1. Each Party may, in its discretion, submit an Expert Report that is prepared by third-party consultants and provide technical information or support bearing on conditions at the WPAH Site or the relative liabilities of the Parties no later than the deadline set forth in the ADR Calendar. Expert Reports will be uploaded to the Document Repository no later than the Expert Report Deadline set forth in the ADR Calendar. 4.2.2.2. Parties may submit Rebuttal Expert Reports responding to any other Party’s Expert Report. Rebuttal Expert Reports will be uploaded to the Document Repository no later than the deadline for Rebuttal Expert Reports set forth in the ADR Calendar. 4.2.2.3. The Expert Reports and Rebuttal Expert Reports shall not exceed 75 double-spaced pages, with 12-point font and 1-inch margins, excluding exhibits. 4.2.3. Position Papers 4.2.3.1. Each Party may submit a Position Paper setting out the factual and legal issues the Party deems relevant to negotiating the claims subject to ADR, including its basis and rationale for a Sitewide Allocation. Position Papers and any materials in support of such Position Papers will be uploaded to the Document Repository no later than the deadline for Position Papers set forth in the ADR Calendar. 4.2.3.2. Each Party may submit a Response to Position Papers setting out any factual statements or legal arguments it wishes to make in response to the other Parties’ Position Papers. Responses to Position Papers and any materials in support of such Responses will be uploaded to the Document Repository no November 4, 2026 E - 49 12 later than the deadline for Response to Position Papers set forth in the ADR Calendar. 4.2.3.3. Position Papers and Responses to Position Papers shall not exceed 50 double-spaced pages, with 12-point font and 1-inch margins, excluding exhibits. 4.3. Phase 3: First Mediation 4.3.1. Mediation Sessions 4.3.1.1. Following completion of Phases 1 and 2 as described above, the Neutral will convene the Parties and will engage in one or more mediation sessions. The primary purpose of Phase 3 is to provide the Parties an opportunity to define and narrow disputed factual, technical, and legal issues before preparation of the Neutral’s Report. Phase 3 is not intended to resolve Sitewide Allocation, adjudicate factual disputes, or determine liability. Nothing in this Agreement, however, precludes the Parties from reaching agreement during Phase 3 on one or more issues or sub-issues that may facilitate resolution of the Sitewide Allocation or otherwise move the ADR Processes forward. The initial Phase 3 mediation session will mark the beginning of Phase 3, which will continue for up to 60 days unless the Neutral recommends and the Parties decide consistent with Section 7.1 to extend Phase 3 for up to a total of 90 days. Notwithstanding the conclusion of Phase 3, the Parties may continue to engage in confidential settlement discussions with each other, and nothing in this Agreement shall prevent them from doing so. 4.3.1.2. Following the initial mediation session the Neutral may convene additional mediation sessions during Phase 3 with all Parties, a subset of the Parties, or a single Party to maximize the resolution of disputed issues necessary for settlement. 4.3.1.3. Contractual Issues affecting the overall allocation shall be generally identified by the Parties in their position papers and Contractual Issues may be, but are not required to be, addressed during the ADR Processes. Information sharing, mediation and other matters related to Contractual Issues shall be arranged by the involved Parties with the Neutral, and shall operate as a parallel but separate process from this Agreement. 4.3.1.4. Each Party will have a representative who is authorized to make settlement decisions present at each mediation session that is convened for November 4, 2026 E - 50 13 said Party; provided, however, that a Party that is a public entity may satisfy this requirement by having a representative present who is authorized to negotiate and recommend settlement terms, subject to any required approvals by that Party’s governing body pursuant to applicable law and public process requirements, including any conditions precedent to the governing body’s authorization or funding of a settlement that must be satisfied before a final commitment can be made, which the public entity shall use diligent efforts to resolve within a reasonable time following any mediation session. 4.3.1.5. All sessions, meetings, and communications (oral or written) by and among the Parties and/or their respective representatives which are intended by the Parties to be in furtherance of, in preparation for, or to facilitate the mediation, regardless of the timing of those sessions, meetings, or communications, are an inseparable and integral part of the Mediation. 4.3.1.6. To the extent that the Neutral convenes mediation sessions on Contractual Issues, the Neutral shall invoice only the Parties involved in those sessions for the time and costs associated with those sessions. 4.3.2. Neutral Communications 4.3.2.1. The Neutral may communicate as he/she deems appropriate with the Parties to advance negotiation and mediation, including scheduling mediation sessions with subsets of Parties for direct negotiation of disputed issues. 4.3.2.2. As part of the mediation, the Neutral may provide mediator’s recommendations to one or more Party or Parties on issues other than Sitewide Allocation if the Neutral believes such recommendations will aid in the goal of resolving or narrowing the issues. Such recommendations may be provided during or following Phase 3. To the extent that the Neutral convenes sessions with a subset of the Parties to resolve issues unique to them, he/she shall invoice his/her time for those sessions only the Parties participating in the sessions. 4.3.3. Supplemental Written Submissions 4.3.3.1. The Neutral may request Supplemental Written Submissions addressing specific factual, technical, or legal issues during this phase of the ADR Processes. 4.3.3.2. Supplemental Written Submissions that relate to Sitewide Allocation shall be shared with all Parties. Supplemental Written Submissions on other November 4, 2026 E - 51 14 issues or that relate to only a subset of the Parties (and not Sitewide Allocation) may be disclosed or withheld from Parties as directed by the Neutral to advance settlement objectives. 4.4. Phase 4: The Neutral’s Report 4.4.1. Scope and Framework of the Neutral’s Report 4.4.1.1. The Neutral shall convene a meeting with the Parties to discuss the scope and framework of the Neutral’s Report. The scope and framework of the Neutral’s Report shall be agreed upon by the Neutral and the Parties but shall include at a minimum: (1) a recommended Sitewide Allocation; (2) the factual bases, legal and equitable factors, and methodologies relied upon by the Neutral in reaching the recommended allocation; and (3) recommendations deemed appropriate by the Neutral and agreed to by the Parties regarding any other issues. In the absence of agreement on any additional recommendations, the Neutral shall proceed with preparation of the Neutral's Report addressing the required Sitewide Allocation. For the avoidance of doubt, the Neutral’s Report, including any recommended Sitewide Allocation, is advisory and non- binding on the Parties and shall not constitute a final determination of any Party’s liability or cost share. 4.4.1.2. The Neutral may begin drafting the Neutral’s Report at any time as a means of advancing their understanding of the issues. 4.4.1.3. The Neutral may incorporate information informed by the Information Exchange (Phase 1), the Advocacy Submissions (Phase 2), the First Mediation (Phase 3), and information obtained during Phase 4. 4.4.2. Additional Allocation Information 4.4.2.1. The Neutral may issue requests to one or more Party or Parties to provide additional factual material or supplemental explanations, including technical and non-technical questions (“Neutral’s Additional Information Requests”). The Neutral may issue Neutral’s Additional Requests for Information until he/she has sufficient information to proceed with the Neutral’s Report. The Neutral shall complete all Neutral’s Additional Information Requests in a timely fashion and avoid unnecessary delays. 4.4.2.2. All of the Neutral’s Additional Information Requests for Information shall include a response deadline. If the Party cannot respond within the November 4, 2026 E - 52 15 timeframe provided, the Party may request a revised response deadline, which will be confirmed by the Neutral in writing. 4.4.2.3. The Neutral shall copy all Parties on the Neutral’s Additional Information Requests and shall upload a copy of all such requests to the Document Repository. Any response by a Party to the Neutral’s Requests for Information will be in writing and uploaded to the Document Repository by the response deadline. 4.4.2.4. If a Neutral’s Additional Information Request asks for technical information, the Neutral or a responding Party may request an opportunity for its expert to meet with the Neutral to discuss the requested information. Other Parties, including their legal and technical representatives, may observe such meeting, but may not provide comments or ask questions. 4.4.3. The Neutral’s Report 4.4.3.1. The Neutral shall produce a Draft Neutral’s Report. 4.4.3.2. Within forty-five (45) days of receipt of the Draft Neutral’s Report, the Parties shall meet with the Neutral to discuss the Draft Neutral’s Report. Each Party may submit written comments on the Draft Neutral’s Report no later than five (5) days in advance of the meeting not exceeding 10 pages, double-spaced, 12-point font, 1-inch margins via upload to the Document Repository and simultaneous delivery to the Neutral and all Parties. 4.4.3.3. Within thirty (30) days of the meeting to discuss the Draft Neutral’s Report, the Parties may submit written comments on the Draft Neutral’s Report. All such comments must be (1) provided to the Neutral in writing, (2) supported only by reference to materials available in the Document Repository, and (3) uploaded to the Document Repository. 4.4.3.4. The Neutral shall consider Parties’ written comments and shall make any revisions to the Neutral’s Report that he/she deems appropriate. The Neutral shall then issue a Final Neutral’s Report. The Final Neutral’s Report shall be uploaded to the Document Repository. 4.5. Phase 5: Second Mediation 4.5.1. Following issuance of the Final Neutral’s Report, the Neutral shall convene the Parties and will engage in one or more mediation sessions in a good faith attempt to resolve the claims subject to Mediation, unless Termination of this Agreement has November 4, 2026 E - 53 16 occurred pursuant to Section 5.3.3 below. The timing and frequency of additional mediation sessions shall be determined by the Neutral in consultation with the Parties. 4.5.2. Each Party will have a representative who is authorized to make settlement decisions present at each mediation session that is convened for said Party; provided, however, that a Party that is a public entity may satisfy this requirement by having a representative present who is authorized to negotiate and recommend settlement terms, subject to any required approval by that Party’s governing body pursuant to applicable law and public process requirements, including any conditions precedent to the governing body’s authorization or funding of a settlement that must be satisfied before a final commitment can be made, which the public entity shall use diligent efforts to resolve within a reasonable time following any mediation session. 4.5.3. All sessions, meetings, and communications (oral or written) by and among the Parties and/or their respective representatives which are intended by the Parties to be in furtherance of, in preparation for, or to facilitate the mediation, regardless of the timing of those sessions, meetings, or communications, are an inseparable and integral part of the Mediation. 5. TERM 5.1. Effective Date. This Agreement is effective as of the Effective Date. 5.2. Termination. This Agreement shall continue in effect until the Parties complete the ADR Processes (“Termination”). Prior to Termination, the Parties may terminate this Agreement upon unanimous written agreement and notice to the Neutral (“Early Termination”). Upon Termination or Early Termination, the Parties shall delete and/or destroy all Confidential ADR Materials disclosed to them by the other Parties or the Neutral within thirty (30) days. Upon Termination or Early Termination the Neutral shall delete and/or destroy all files relating to this matter no later than ninety (90) days following the conclusion or termination of this Agreement, or upon the conclusion of his work under this Agreement, whichever occurs earlier. 5.3. Withdrawal. 5.3.1. Notice of Early Withdrawal. Any Party may withdraw from this Agreement with 30 days written notice via electronic mail to the remaining Parties and the Neutral delivered on or before the Phase 2 completion date (“Early Withdrawal”). The Phase 2 completion date shall be the deadline for responses to position papers identified on the ADR Calendar. The withdrawing Party shall be responsible for paying its share of the Neutral’s Fees and Costs incurred through the date of its notice of Early Withdrawal. The remaining Parties shall confer regarding whether to continue the ADR Processes or terminate this Agreement. An Early Withdrawal shall November 4, 2026 E - 54 17 become effective upon expiration of the 30-day notice period. After completion of Phase 2, the withdrawal procedures in Sections 5.3.2 and 5.3.3 apply, except that if a Party timely provides notice of Early Withdrawal, any other Party may also elect Early Withdrawal by providing written notice via electronic mail to the remaining Parties and the Neutral that it intends to withdraw from this Agreement within 30 days of the effective date of the initial Early Withdrawal. A subsequent Early Withdrawal under this Section shall not trigger an additional 30-day Early Withdrawal period. 5.3.2. Notice of Withdrawal. Any Party desiring to withdraw from this Agreement (“Withdrawing Party”) that does not constitute an Early Withdrawal (“Withdrawal”) shall provide 30 days written notice by electronic mail to the representatives of all other Parties and the Neutral identified in Section 7.18 (the “Withdrawal Notice”). The Withdrawing Party shall be responsible for paying its share of the Neutral's Fees and Costs incurred through the date of its Withdrawal Notice. A Withdrawal shall become effective upon expiration of the 30-day Withdrawal Notice period. 5.3.3. Consequences of Withdrawal. If a Party withdraws pursuant to Section 5.3.2, the Neutral shall immediately cease any pending mediation sessions and shall redirect all efforts toward preparation of the Neutral’s Report, including completion of the Draft Neutral’s Report, the Parties’ comment process set forth in Section 4.4.3, and issuance of the Final Neutral’s Report. The Neutral shall complete and issue the Draft Neutral's Report no later than one hundred twenty (120) days following the effective date of the Withdrawal. Upon issuance of the Final Neutral’s Report, unless the remaining Parties unanimously agree otherwise, this Agreement shall terminate in accordance with Section 5.2, and the document destruction obligations set forth in Section 5.2 shall apply to all Parties, the Withdrawing Party, and the Neutral. In the event that two or more Parties concurrently serve Withdrawal Notices within the same thirty (30)-day period, the Neutral shall proceed directly to preparation of the Neutral’s Report, with the 120-day deadline running from the effective date of the first-served Withdrawal. 5.4. In the event of Termination of this Agreement, Early Termination, or in the case of a Withdrawal by any Party, the following provisions shall remain in full force and effect: Sections 6 and 7.2 to 7.18. 6. CONFIDENTIALITY 6.1. The Parties intend that their communications with the Neutral and with one another during the ADR Processes, whether written or oral, will be kept confidential among the Parties and the Neutral to the fullest extent allowed by law, regardless of whether the information was November 4, 2026 E - 55 18 exchanged before the execution of this Agreement and regardless of whether a writing or document is marked “Confidential.” 6.2. The services of the Neutral are being engaged to conduct ADR among the Parties. The Neutral is functioning as a “Mediator” for the Parties, and the ADR Processes shall be considered a mediation that is covered by RCW 42.56.600 (exemption from public disclosure for records of mediation communications) and RCW 7.07.030 (mediation communications are privileged). 6.3. Mediation communications, as defined in RCW 7.07.010(2), including those materials and communications exchanged among the Parties and the Neutral during the ADR Processes, shall be kept confidential to the fullest extent allowed by law, unless those protections are waived. Likewise, all Confidential Information that is shared among the Parties, shared between Parties and the Neutral, or prepared by the Neutral is “settlement offer and negotiation information” that is protected from disclosure by Federal Rule of Evidence 408. The Neutral and Parties shall hold in strict confidence and not disclose to third parties: any Confidential Information that may be disclosed to the Neutral or shared among the Parties in the course of the ADR Processes except as: (1) required by governmental or judicial mandate; (2) provided in Section 6.6 below; or (3) by unanimous agreement of all Parties. The Neutral and the Parties shall ensure that their representatives also comply with this obligation of confidentiality. 6.4. The Parties reaffirm that they have an ongoing common interest relating to the Site as recognized in the 2025 Provisional Cost Sharing Agreement. Nothing in this Agreement shall be construed to negate, minimize, or otherwise impact the confidentiality provisions as set forth in Section 5.0 of the 2025 Provisional Cost Sharing Agreement. 6.5. The Neutral and the Parties agree all opinions and work product of the Neutral shared with a Party or Parties shall be maintained as Confidential Information and shall not be shared with any other person or entity without the written consent of all Parties. For the avoidance of any doubt, the Parties specifically agree that the Draft Neutral’s Report and Final Neutral’s Report are considered confidential information and may not be shared outside of the ADR Processes. The Neutral’s Report (including the Draft Neutral’s Report and the Final Neutral’s Report), any Sitewide Allocation recommendation, and all Confidential ADR Materials are inadmissible in any litigation, arbitration, or other adversarial proceeding, to the fullest extent permitted by law, including under Federal Rule of Evidence 408, Washington Rule of Evidence 408, and Washington’s Uniform Mediation Act, RCW Ch. 7.07. No Party shall seek to introduce or use any such materials in any such proceeding, and no Party shall subpoena or otherwise compel the Neutral to testify or produce such materials. The Parties agree to oppose any effort by any person or entity to introduce such materials in any proceeding. November 4, 2026 E - 56 19 6.6. If a Party that is a public entity receives a request for public records that could potentially result in the disclosure of Confidential Information, the public entity shall: (1) protect Confidential Information from disclosure or public release to the extent permitted by law; and (2) promptly notify all Parties whose documents or communications are or may be subject to the request. Notice shall be given in the most expeditious manner available. The Parties whose documents or communications are or may be subject to the request for records may take whatever action they deem appropriate, such as seeking a restraining order from a court with jurisdiction. 6.7. Unless prohibited by law, the Neutral agrees to provide prompt notice to Parties of any of the following events: (1) a request by anyone to examine, inspect, or copy Confidential Information; or (2) any attempt to serve, or the actual service of, any court order, subpoena, or summons upon the Neutral or its representatives that requires the production of Confidential Information. 6.8. The obligations contained in this Section 6 shall survive the Termination of this Agreement, regardless of the cause or reason for Termination, unless the WPAH Group unanimously provides a release of the obligations. 7. GENERAL TERMS 7.1. Decision Making. The Parties agree to seek unanimous consensus for any decisions related to the implementation of this Agreement, including without limitation, selection, management, and direction of the Neutral, addition of other parties to this Agreement, or scheduling mediation sessions. Where unanimous consensus cannot be achieved for any WPAH Group decisions under this Agreement and a decision does not require unanimous consent, any Party may call for a vote on such decision. Each Party has one vote. A majority of votes cast for a decision shall prevail. In the event of a 50-50 split, the Neutral will cast the deciding vote. 7.2. Fees and Costs. Each Party shall bear its own costs and fees associated with this Agreement and participation in the ADR Processes. 7.3. Documents. As between the Neutral and the WPAH Group, all information, data and reports generated by or furnished to the Neutral under this Agreement shall be the property of the WPAH Group. As between the Neutral and a Party, all information, data and reports generated by or furnished to the Neutral under this Agreement shall be the property of the producing Party. Each Party’s respective submissions shall remain the property of the submitting Party. Upon Termination of this Agreement, all such information shall be destroyed, delivered, or returned in accordance with Section 5. 7.4. Parties Reserve All Claims, Rights, and Defenses. Prior to and except as may be provided in any settlement, the Parties reserve all claims, rights, and defenses, including claims, November 4, 2026 E - 57 20 rights, and defenses against one another, and any third parties, with respect to Past Costs, Future Costs, and any other matters subject to the ADR Processes. 7.5. Litigation Among Parties During Term of This Agreement. 7.5.1. Notice Before Institution of New Litigation. Except as may be provided in any settlement between or among the Parties, the Parties reserve the right to initiate litigation against each other or any other party at any time during the term of this Agreement; provided, however, that prior to instituting any litigation against a Party(s), the Party intending to file (“Noticing Party”) shall provide written notice by electronic mail to the representatives of all other Parties and the Neutral identified in Section 7.18 (the “Litigation Notice”), and, unless otherwise required by law or court order, allow a period of no less than thirty (30) days from delivery of the Litigation Notice before filing. Nothing in this section shall be construed to prohibit any Party from taking emergency or time-sensitive action (including seeking injunctive relief) as may be necessary to protect its legal rights, provided that the Noticing Party shall provide prompt written notice to all other Parties and the Neutral of any such emergency action. The provisions of this Section 7.5.1 shall apply to the initiation of new litigation or the joining of a previously uninvolved Party(s) to litigation that existed on the Effective Date. The provisions of this Section 7.5 shall apply only to the litigation between the Parties related to the Site. 7.5.2. Consequences of Pursuing Litigation. If, following the thirty (30)-day notice period described in Section 7.5.2, the Noticing Party elects to pursue litigation, then: (a) if the Litigation Notice is served prior to the completion of Phase 2, the remaining Parties shall confer regarding whether to continue the ADR Processes or terminate this Agreement; or (b) if the Litigation Notice is served following completion of Phase 2, the Neutral shall immediately cease any pending mediation sessions and shall redirect all efforts toward preparation of the Neutral’s Report, including completion of the Draft Neutral’s Report, the Parties’ comment process set forth in Section 4.4.3, and issuance of the Final Neutral’s Report. If subsection (b) applies, the Neutral shall complete and issue the Draft Neutral's Report no later than one hundred twenty (120) days following the expiration of the thirty (30)-day notice period described in Section 7.5.2. Upon issuance of the Final Neutral's Report, this Agreement shall terminate in accordance with Section 5.2. In the event that two or more Parties concurrently serve Litigation Notices within the same thirty (30)-day period, the Neutral shall proceed directly to preparation of the Neutral’s Report, with the 120-day deadline running from the expiration of the first-served notice period. 7.6. Insurance. The Parties do not intend hereby to make any agreement that will prejudice any Party with respect to its insurers and, by entering into this Agreement, anticipate that the November 4, 2026 E - 58 21 actions taken pursuant to this Agreement will benefit such insurers. Nothing in this Agreement is intended to prevent a Party from sharing this Agreement and Confidential Information developed pursuant to this Agreement with a Party’s insurance carriers with direction in writing that the carrier(s) keep the information confidential and abide by the provisions of Section 6 (Confidentiality) hereto, and doing so shall not be construed as violating any confidentiality provisions of this Agreement. 7.7. Legal Advice. No Party, or representative or counsel for any Party, has acted as counsel for any other Party with respect to such Party’s entering into this Agreement, except as expressly engaged by such Party with respect to this Agreement, and each Party represents that it has sought and obtained any appropriate legal advice it deems necessary prior to entering into this Agreement. 7.8. No Attorney/Client Relationship. No Party or its representative shall act or be deemed to act as legal counsel or representative of any other Party, unless expressly retained by such Party for such purpose, and except for such express retention, no attorney/client relationship is intended to be created between or among the Parties, their representatives, and respective attorneys. The Neutral is not acting as legal counsel for any Party. 7.9. No Partnership or Joint Venture and/or Principal and Agent Relationship. Nothing in this Agreement shall be deemed to create a partnership, joint venture, or principal and agent relationship between or among the Parties or the Neutral. 7.10. Denial of Liability. Each Party understands and agrees that by entering into this Agreement, it does not admit, and it specifically denies, liability or fault for any and all of the facts, legal contentions, and occurrences alleged against it with respect to the Site. Neither this Agreement nor any information submitted or any action taken by any Party pursuant to this Agreement shall constitute or be interpreted, construed, or used as evidence of an admission of liability, law or fact or a waiver of any right or defense by, or an estoppel against, any Party. 7.11. Governing Law. This Agreement shall be governed by, and construed in accordance with, the laws of the State of Washington; and the parties hereto submit to jurisdiction in the State of Washington for the limited purpose of resolving any disputes that may arise out of, or relate to, this Agreement. The Parties irrevocably and unconditionally agree to waive a trial by jury in any action, proceeding, or counterclaim arising out of this Agreement. 7.12. Amendments. No amendment or modification of this Agreement shall be valid unless unanimous and evidenced in writing and signed by an authorized representative for each Party. A new party may be added to this Agreement through an amendment hereto. November 4, 2026 E - 59 22 7.13. Interpretation. 7.13.1. The Parties have jointly participated in the negotiation and drafting of this Agreement. In the event of an ambiguity or question of intent or interpretation arises, this Agreement shall be construed as if drafted jointly by the Parties and no presumptions or burdens of proof shall arise favoring any Party by virtue of the authorship of any of the provisions of this Agreement. 7.13.2. Section and subsection headings contained in this Agreement are inserted for convenience of reference only, shall not be deemed to be a part of this Agreement for any purpose, and shall not in any way define or affect the meaning, construction or scope of any of the provisions of this Agreement. 7.13.3. Unless the context otherwise requires, references in this Agreement (i) to Sections or Exhibits mean the Sections of and the Exhibits attached to this Agreement, (ii) to an agreement, instrument or document means such agreement, instrument or document as amended, supplemented and modified from time to time to the extent permitted by the provisions thereof, and (iii) to an applicable law means such applicable law as amended from time to time and includes any successor legislation thereto and regulations promulgated thereunder. 7.14. This Agreement and the ADR Processes created by it are a voluntary effort among the Parties to settle claims. Except for a breach of the Confidentiality Provisions in Section 6 of this Agreement, and/or the obligation to pay the Neutral’s Fees and Costs, nothing contained in this Agreement gives any party the right to commence suit or otherwise attempt to enforce any provision of this Agreement through judicial action of any kind and each of the Parties disclaims and waives any such right of action. Each party agrees that its sole and exclusive remedy against any other Party for any alleged claim other than for an alleged breach of the Confidentiality Provisions or obligation to pay the Neutral’s Fees and Costs is to withdraw under Section 5.3. 7.15. No Waiver. Failure of any Party to require performance of any provision of this Agreement shall not affect either that Party’s ability to require performance of any other provisions of this Agreement or any other Party’s right to require full performance at any time thereafter; and the waiver by any Party of a breach of any provision of this Agreement shall not constitute a waiver of a similar breach in the future or of any other breach or nullify the effectiveness of such provision(s). 7.16. Successors And Assigns. This Agreement shall be binding upon and inure to the benefit of the Parties and to their successors or assigns. 7.17. Validity. In the event that any provision or any part or portion of a provision of this Agreement is held to be invalid, void, or otherwise unenforceable, such holding shall not affect November 4, 2026 E - 60 23 the remaining part or portion of that provision, unless the removal of the invalid or unenforceable provision would substantially defeat the basic purpose of this Agreement. 7.18. Notices. All notices under this Agreement shall be in writing and communicated via electronic mail to the following Neutral and Party representatives as follows: 7.18.1. City of Port Angeles Nathan West City Manager 321 East 5th Street Port Angeles, WA 98362 Phone: (360) 417-4500 Email: nwest@cityofpa.us and Sheida Sahandy City Attorney 321 East 5th Street Port Angeles, WA 98362 Phone: (360) 460-5265 Email: ssahandy@cityofpa.us with copy to: Mark Myers Williams Kastner Two Union Square 601 Union Street, Suite 4100 Seattle, WA 98101-2380 Phone: (206) 550-7075 Email: mmyers@williamskastner.com 7.18.2. Georgia-Pacific LLC Jessie Rosell Georgia-Pacific Consumer Operations LLC Law Department 4111 E 37th Street N. P.O. Box 2256 Wichita, KS 67220 jessie.rosell@kochcc.com with copy to: November 4, 2026 E - 61 24 Steve Thiele Thiele Law Firm PLLC P.O. Box 4759 Rollingbay, WA 98061 steve@thielelaw.com and Anne Lynch Van Ness Feldman LLP 1191 Second Avenue, Suite 1800 Seattle, WA 98101 alynch@vnf.com 7.18.3. Merrill & Ring, Inc. Nicole Kimzey COO 809 E. 8th St. Port Angeles, WA 98362 Phone: (360) 452-0315 with copy to: Maureen Mitchell Fox Rothschild LLP 1001 Fourth Avenue, Suite 4400 Seattle, WA 98154 Phone: (206) 389-1773 Fax: (206) 389-1708 Email: mmitchell@foxrothschild.com and Norm Schaaf Phone: (360) 460-1365 Email: northstar@wavecable.com 7.18.4. Nippon Paper Industries USA Co. Ltd. Kensuke Suzuki Senior Manager, International Business Department Ochanimizu Sola City 4-6 Kandasurugadai, Chiyoda-Ku Tokyo 101-0062 JAPAN Phone: +81 3 6665 1267 November 4, 2026 E - 62 25 Fax: +81 3 6665 0305 with copy to: Maureen Mitchell Fox Rothschild LLP 1001 Fourth Avenue, Suite 4400 Seattle, WA 98154 Phone: (206) 389-1773 Fax: (206) 389-1708 Email: mmitchell@foxrothschild.com and Steve Johnson Phone: (360) 797-3605 Email: stevej.npiusa@olypen.com 7.18.5. Owens-Corning Mindy Kairis Director, Regulatory Law & Government Affairs Email: mindy.kairis@owenscorning.com with copy to: Endre Szalay K&L Gates, LLP 925 Fourth Avenue, Suite 2900 Seattle, WA 98104 Phone: (206) 370-6744 Email: endre.szalay@klgates.com 7.18.6. Port of Port Angeles Paul Jarkiewiez Chief Executive Officer 388 W. First St. Port Angeles, WA 98362 Phone: (360) 417-3360 Email: paulj@portofpa.com and Chris Hartman Chief Operating Officer November 4, 2026 E - 63 26 338 W. First St. Port Angeles, WA 98362 Phone: (360) 417-3422 Email: chrish@portofpa.com with copy to: Andy Rigel Hillis Clark Martin & Peterson P.S. 999 Third Avenue, Suite 4600 Seattle, WA 98104 Phone: (206) 623-1745 Email: andy.rigel@hcmp.com Each of the undersigned representatives certifies that he or she is fully authorized to enter into the terms and conditions of this Agreement and to bind the Party he or she represents to this document. SO AGREED and executed by and on behalf of: CITY OF PORT ANGELES By: ______________________________ Name: ____________________________ Title: _____________________________ Date: _____________________________ GEORGIA-PACIFIC LLC By: ______________________________ Name: ____________________________ Title: _____________________________ Date: _____________________________ MERRILL & RING, INC. By: ______________________________ Name: ____________________________ Title: _____________________________ Date: _____________________________ November 4, 2026 E - 64 27 NIPPON PAPER INDUSTRIES USA CO., LTD. By: ______________________________ Name: ____________________________ Title: _____________________________ Date: _____________________________ OWENS CORNING, INC. By: ______________________________ Name: ____________________________ Title: _____________________________ Date: _____________________________ PORT OF PORT ANGELES By: ______________________________ Name: ____________________________ Title: _____________________________ Date: _____________________________ November 4, 2026 E - 65 Exhibit A November 4, 2026 E - 66 Privileged & Confidential – For Settlement / Mediation Purposes Only Exhibit A: ADR Calendar Event Deadline Effective Date The date when all Parties have signed the Agreement (est. ~Oct. 1, 2026) The Port shall upload to the Document Repository an updated accounting of the WPAH Group costs incurred to date, together with any information necessary for the other Parties and/or the Neutral to evaluate the Past Site Costs. Within 30 days of the Effective Date (est. ~Nov. 1, 2026) Unanimous agreement on additional Joint Submission Documents. (Note that Joint Submission Documents must be uploaded by the WPAH Group within 7 days of written agreement of the Parties.) Within 30 days of the Effective Date (est. ~ Nov. 1, 2026) Deadline for completion of Required Party Disclosures December 11, 2026 NPIUSA/M&R Obtains Access to Document Repository December 12, 2026 Rebuttal Evidence Deadline Feb. 1, 2027 Deadline for Requests for Additional Information Mar. 1, 2027 Deadline for Responses to Requests for Additional Information Apr. 1, 2027 Summary Disclosure Statements May 3, 2027 Modifications to the Summary Disclosure Statements June 7, 2027 Deadline for Expert Reports 60 days following receipt of validated RD data package Rebuttal expert reports 30 days after the deadline for expert reports November 4, 2026 E - 67 Privileged & Confidential – For Settlement / Mediation Purposes Only Position Papers 60 days after the deadline for rebuttal expert reports Responses to Position papers Phase 2 Completion Date 60 days after the deadline for position papers First Mediation Session(s) No deadline (est. ~Q2 2028) Conclusion of Phase 3 + potential extension (up to total 90 days) No deadline (est. ~ Q3 2028) Preparation of Draft Neutral’s Report, meeting, written comments, and Final Neutral’s Report No deadline (est. ~2028) Second Mediation No deadline (est. ~2028-29) November 4, 2026 E - 68 Exhibit B November 4, 2026 E - 69 November 4, 2026 E - 70 Date: November 4, 2026 To: City Council From: Nathan West, City Manager Sarina Carrizosa, Finance Director Subject: Ordinance Levying 2026 Property Tax for Collection in 2027 Relationship to Strategic Plan: Adoption of the property tax levy aligns with Strategic Focus Area #2 –Citywide Resource Optimization goal to maintain fiscal health by maximizing available resources to sustainably balance the budget. This also directly impacts maintaining fund balance requirements. Background / Analysis: In accordance with state law, the 2027 Preliminary Budget was filed with the City Clerk on October 16, 2026. In addition, a presentation of estimated 2027 Revenues was provided to Council at a public hearing on October 20. This presentation included a brief summary of the property tax increase anticipated in 2027, including the Council policy-based assumption of a 1% increase. State law also requires that the City levy property taxes before November 30 of each year. The property tax ordinance is scheduled for adoption at the November 17 Council meeting. Additionally, tonight’s public hearing will include an opportunity for comments on the 2026 levying of property tax collection in 2027. The City Council, by simple majority vote, can increase the regular property tax levy by the lesser of one percent, or the amount of the implicit price deflator (IPD). For 2027 collection, the IPD is 3.876%. This means the maximum allowable increase in 2027 is 1.0%. The estimated value of a 1.0% increase in property tax collection in 2027 is approximately $53,100. Summary: In accordance with State law, the City of Port Angeles is required to levy property taxes before November 30. During tonight’s meeting, there will be a presentation on property taxes and an opportunity for the public to comment on the proposed 1.0% increase to the levy during the public hearing. This is the first reading of the property tax ordinance. Strategic Plan: The adoption of the ordinance levying property tax generally aligns with Strategic Focus Area #2 – Citywide Resource Optimization goal to maintain fiscal health. Funding: Property tax is the City’s second largest source of funding for general City services. Total property tax collection for 2027 is estimated to be $5,407,800. Recommendation: It is recommended tonight that the City Council should: 1.Open the Public Hearing. 2.Continue the Public Hearing on the Property Tax Ordinance to the November 17 meeting. 3.Conduct the First Reading of the Ordinance levying property tax for collection in 2027. November 4, 2026 F - 1 Per section 2.13 of the City’s Financial Policies, Council has directed the incorporation of the 1.0% increase on an annual basis. The City is also able to collect property tax on the value of new construction added during the past year, this is estimated at $38,500 in 2027. These estimations are subject to change until Clallam County certifies the tax levy. Funding Overview: Property tax is the City’s largest source of funding for general City services. Total property tax collection for 2027 is estimated to be $5,407,800. Attached: Ordinance Levying 2025 Property Tax for Collection in 2026. November 4, 2026 F - 2 ORDINANCE NO. AN ORDINANCE of the City of Port Angeles, Washington, levying regular ad valorem property taxes for collection in the fiscal year 2027, and directing the City Clerk to certify said amount to the Board of Clallam County Commissioners. WHEREAS, the City Council intends to levy property taxes for collection in 2027. WHEREAS, the City Council has adopted a Resolution pursuant to RCW 84.55.120 authorizing for the 2027 levy a 1.0%, or $52,985.28, increase over the actual levy for 2026. WHEREAS, the City’s actual levy amount from the previous year was $5,298,528.04; and, WHEREAS, the City’s population is greater than 10,000, NOW, THEREFORE, the City Council of the City of Port Angeles do hereby ordain as follows: Section 1. The amount of the actual levy for the fiscal year commencing January 1, 2027 shall be an increase of $52,985.28 which is a 1.0 percent increase from the previous year, plus: Additional revenue resulting from new construction, improvements to property, newly constructed wind turbines, any increase in the value of state-assessed property, any annexations that have occurred and refunds made. Section 2. The City Clerk is hereby directed to certify to the Board of Clallam County Commissioners the amount of ad valorem taxes to be levied for the fiscal year commencing January 1, 2027, as set forth in Section 1 of this Ordinance. Section 3. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum. This ordinance shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the _____ day of November 2026. Kate Dexter, Mayor November 4, 2026 F - 3 ATTEST: _____________________________ Kari Martinez-Bailey, City Clerk APPROVED AS TO FORM: _____________________________ Sheida R. Sahandy, City Attorney PUBLISHED: ,2026 (By Summary) November 4, 2026 F - 4 1 Date: November 4, 2026 To: City Council From: Calvin W. Goings, Deputy City Manager Shannen C. Cartmel, CED Manager Ben Braudrick, Planning Supervisor Courtney Bornsworth, Natural Resources Associate Planner and Grant Administrator Subject: Municipal Code Amendments to portions of Title 15 of the Port Angeles Municipal Code Related to the 2025 Comprehensive Plan Periodic Update Critical Areas Ordinance (CAO) Component (MCA 26-0090) Relationship to Strategic Plan: The proposed Critical Areas Ordinance amendments advance multiple objectives of the City's 2025-2026 Strategic Plan, including Strategic Focus Area #1 – Community Resilience, Goals B and C, and Strategic Focus Area #3 – Housing, Goals A and B. The amendments reinforce environmental stewardship through science-based protections and opportunities for ecological enhancement, while promoting public safety by establishing development standards that reduce risks associated with natural hazards. Consolidating and modernizing the City's critical areas regulations also promotes efficient practices through clearer, more consistent, and more predictable permitting procedures. Additionally, the amendments are the final component of the City's required 2025 Comprehensive Plan Periodic Update, support implementation of Vision 2045, and establish development standards that balance environmental protection with reasonable opportunities for housing and community development. Summary: The proposed amendments to Title 15 of the Port Angeles Municipal Code (MCA 26- 0090) represent the final component of the City's required 2025 Comprehensive Plan Periodic Update. The amendments modernize and consolidate the City's Critical Areas Ordinance (CAO) to ensure consistency with the Growth Management Act (GMA), current state requirements, and best available science, while establishing clearer, more consistent, and predictable development standards. The first reading was conducted during the October 20, 2026, Council meeting. However, due to time constraints, a motion was passed to continue Council discission of this matter to the November 4, 2026, Council meeting. The second reading will occur at the November 17, 2026, Council meeting. The proposed legislation would become effective on December 31, 2026. Strategic Plan: Strategic Focus Area #1 – Community Resilience, Goals B and C; Strategic Focus Area #3 – Housing, Goals A and B. Funding: N/A Recommendation: 1) Continue discussion from the October 20, 2026 first reading of the ordinance, and 2) continue this matter to the November 17, 2026, Council Meeting. November 4, 2026 G - 1 2 Background / Analysis: The City is required under the Growth Management Act (GMA) to periodically update the City’s Critical Areas Ordinance (CAO) to ensure ongoing compliance with recent state legislation. The attached ordinance complies with state development standards legislation from 2017-2025 and includes proposed amendments to improve clarity, readability, and consistency with best available science guided by state and federal agencies. The amendments reorganize the existing CAO into a more streamlined development regulation that is easier for both internal and external users to navigate. The amendments update and consolidate definitions and establish specific development regulations for each of the five regulated critical areas. The proposed amendments establish a balanced regulatory framework that protects critical area functions and values, promotes ecological enhancement where feasible, and safeguards people, property, and infrastructure from natural hazards. At the same time, the amendments provide clearer standards, more predictable permitting pathways, and reasonable opportunities for property use and development consistent with applicable state requirements. The proposed ordinance also reflects substantial public engagement and interagency coordination. Feedback received from community members, stakeholders, the Planning Commission, City Council, and state agencies has informed revisions throughout the process, resulting in a more comprehensive and responsive regulatory framework. The first reading was conducted during the October 20, 2026, Council meeting. However, due to time constraints, a motion was passed to continue Council discussion of this matter to the November 4, 2026, Council meeting. The second reading will occur at the November 17, 2026, Council meeting. The proposed legislation would become effective on December 31, 2026. Chapter 15.02 – Definitions Updates and consolidates definitions applicable to Title 15 to improve clarity, consistency, and alignment with current state requirements and best available science. New Chapter 15.22 – Critical Areas Establishes a comprehensive, consolidated chapter governing critical areas protections, permitting procedures, and development standards. The new chapter combines the existing regulations previously contained in Chapter 15.20 – Environmentally Sensitive Areas and Chapter 15.24 – Wetlands, into a single, more streamlined regulatory framework. The reorganization establishes general provisions and review procedures applicable to all critical areas, followed by dedicated regulations for each of the five critical area types. This approach improves consistency, reduces unnecessary duplication, and makes the regulations easier for property owners, applicants, and City staff to navigate and administer. Comments and Feedback Throughout the CAO update process, the City has engaged with community members, property owners, stakeholders, the Planning Commission, City Council, and state agencies to solicit feedback and ensure the proposed regulations reflect both applicable state requirements and local considerations. Following the August 25, 2026, City Council Work Session and the September 23, 2026, Planning Commission meeting and public hearing, staff continued to receive and evaluate public comments and agency recommendations. In total, 365 comments were received and reviewed, with staff responses documented in Attachment 3. Throughout the entire process, public and agency feedback has played an important role in refining the proposed ordinance. While staff addressed many earlier comments through revisions at the Planning November 4, 2026 G - 2 3 Commission level, additional comments received during and after the September 23 public hearing have led to ten further amendments proposed by staff intended to improve clarity, strengthen environmental protections, and provide greater certainty in applying the regulations. Staff appreciate the significant time and effort community members, stakeholders, and agency representatives have invested throughout this process. The following summarizes the ten additional areas of refinement that staff are recommending and the corresponding amendments that have been incorporated into the proposed ordinance. 1. Citing the science used for wetland buffering and ensuring buffer averaging and reduction will not lead to a net loss of wetland function. Staff Response: A reference was added to indicate the source used for wetland buffers: The Department of Ecology Wetland Guidance for Critical Areas Ordinance (CAO) updates for Western Washington, Publication #22-06-014, as amended. Amendments to the buffer averaging and reduction subsections found in 15.22.240.D and 15.22.240.E were made to ensure averaging and reductions cannot be used in combination. These subsections followed the Department of Ecology’s guidance document and a Department of Ecology representative reviewed them and expressed no concerns about the proposed draft. Further limitations were established for allowed buffer uses, including requiring restoration of disturbed areas, limiting herbicide use, and setting clear parameters for who may apply them. 2. Ongoing viewshed enhancement requests for landowners situated above a geologically hazardous area. Staff Response: In response to the motion passed by the Planning Commission during the September 23, 2026, Public Hearing, provisions have been added that would provide a path for annual, non-destructive pruning and trimming of vegetation for maintenance purposes in accordance with a valid, previously approved report as prepared by an ISA Certified Arborist. Existing regulations around viewshed enhancements was relatively unchanged and is shown in 15.22.080.D.8. Property owners may continue to apply for routine viewshed enhancement so long as they own the land on which the work is to be done and can meet the criteria outlined in the regulation. 3. Establish a clear path for Tribal consultation, especially for projects proposed near treaty- protected fish. Staff Response: Staff has added section 15.22.025 – Tribal Consultation, that sets clear standards for notifying all affected tribes when an application is received for a proposal in or near streams, riparian management zones, wetlands, fish and wildlife habitat conservation areas, floodplains and critical aquifer recharge areas, setting timeframes for review and response to those proposals, and to what effect the consultation provides. 4. Ensure the permitting of a proposal in a previously altered critical area will not lead to a net loss of functions and values. Staff Response: Proposals that seek to develop in an area that has been previously disturbed must still meet the provisions of the chapter to ensure no net loss of functions and values, and where feasible, strive for ecological enhancement of those areas. Amendments were made to 15.22.090.C.2 to require a qualified professional use field data to document, which functions remain, which are permanently lost, November 4, 2026 G - 3 4 and which can be restored. These proposals are processed under a Type II Critical Area Permit and must meet all the provisions of the chapter, including mitigation sequencing. 5. Clear regulations around stormwater facilities and the criteria from the Department of Ecology that allow such modifications. Staff Response: Subsection 15.22.090.C.3 sets the requirements for stormwater management facilities that may be permitted in a wetland or its buffer based on the feedback received from the Department of Ecology. The language included is specifically from Ecology’s guidance document and ensures that any proposal for this use meets the requirements of Low Impact Development methodology for Flow Control. 6. Ensure reasonable use exceptions and variances still protect critical area functions and values while allowing the minimum use of a property that would otherwise be denied. Staff Response: Section 15.22.100 – Reasonable Use Exceptions, establishes specific review criteria consistent with the Department of Commerce Critical Areas Ordinance Handbook to provide a limited pathway for reasonable property use where application of critical areas regulations would otherwise preclude reasonable development. The proposed amendments strengthen the review process by requiring independent third-party review of application materials and consultation with affected tribes pursuant to Section 15.22.025. Additional provisions clarify that reasonable use exceptions cannot authorize the taking of species protected under the federal Endangered Species Act, impairment of treaty-protected rights, or activities otherwise prohibited by applicable law. Reasonable use exceptions are processed as Type III Critical Areas Permits, with final decisions made by the Hearing Examiner. This process provides an additional level of review and accountability for proposals requiring exceptions to established critical areas protections. The amendments also clarify that critical areas variances are limited to applicable building setbacks and other dimensional development standards and do not authorize reductions or modifications to required critical area buffers. 7. Remove the multiple cross-references to shoreline management within the Critical Areas Ordinance pursuant to the separation of the Shoreline Master Program from the CAO as established in RCW 36.70A.480. Staff Response: Although staff received multiple comments requesting stricter regulation around marine bluffs and proper stewardship of these areas, including improving stormwater management and establishing larger buffer sizes, feedback received from the Department of Ecology and a reference to RCW 36.70A.480 led staff to remove all references to marine bluffs and shoreline management from the CAO. Shoreline management, including buffer requirements, stormwater and vegetation management, and setback requirements are to be regulated under the City’s Shoreline Master Program (SMP). The City will make many of these adjustments during the next update to the City’s SMP. Removing cross-references to the SMP from the CAO helps establish clear expectations for permitting requirements in areas that have often overlapped in the existing CAO, which has led to confusion amongst property owners and City staff alike. November 4, 2026 G - 4 5 8. Remove undefined standards that leave the outcome to the decision–maker (i.e., the applicable Director). Staff Response: Staff reviewed and refined provisions throughout the proposed ordinance to clarify ambiguous terminology, establish more objective development standards, and provide greater consistency in administering critical areas regulations. These amendments establish clearer application requirements, qualified professional reporting standards, and specific criteria for evaluating development proposals. By reducing unnecessary ambiguity and establishing more predictable review procedures, the proposed regulations improve transparency, support consistent and defensible permitting decisions, and provide greater certainty for applicants and property owners. The amendments also preserve appropriate administrative authority to evaluate individual proposals based on site-specific conditions, applicable regulations, and the recommendations of qualified professionals. 9. Move beyond the no-net-loss standard and shift toward ecological gain. Staff Response: The City's recently adopted Vision 2045 Comprehensive Plan establishes policy direction supporting the protection and, where feasible, enhancement of critical area functions and values. The proposed ordinance implements this direction while maintaining the no-net-loss standard for ecological functions and values consistent with applicable state requirements and guidance. Section 15.22.010 establishes the purpose of the chapter as protecting critical areas and, where feasible, enhancing their ecological functions and values. This approach is further reflected throughout the proposed regulations, including mitigation sequencing, mitigation plan requirements, wetland enhancement opportunities, and provisions intended to protect and improve fish and wildlife habitat conservation areas. The proposed regulations recognize that ecological enhancement opportunities vary depending on existing site conditions, development constraints, and environmental characteristics. Accordingly, the ordinance establishes a balanced framework that maintains required environmental protections while encouraging restoration and ecological improvements where feasible and consistent with best available science. This approach supports implementation of the City's Comprehensive Plan policies while providing reasonable, science-based, and predictable development standards consistent with WAC 365-196-830 and applicable Washington Department of Fish and Wildlife guidance. 10. Ensure climate resiliency and habitat connectivity are consistent throughout the regulation, specifically when discussing fencing requirements and culvert and bridge replacement projects. Staff Response: Staff made minor modifications to the following subsections to ensure items such as fencing requirements, stream crossings, restoration projects, and the daylighting of culverted streams are addressed accordingly, with special attention to flood-carrying capacity and maintaining fish and wildlife habitat corridors. • 15.22.090.C.4.f • 15.22.150.B.2 • 15.22.480.D.2.e November 4, 2026 G - 5 6 Funding Overview: N/A Attachment(s): 1. Ordinance for MCA 26-0090 2. Exhibit A: Periodic Update Draft Code 3. Public Comments and Responses Received 4. September 23, 2026, Planning Commission Packet 5. September 23, 2026, Planning Commission Meeting Draft Minutes November 4, 2026 G - 6 Attachment 1 1 ORDINANCE NO. ______ AN ORDINANCE of the City of Port Angeles, Washington, relating to Critical Areas; amending Chapter 15.02 of the Port Angeles Municipal Code; repealing Chapters 15.20 and 15.24; adopting a new Chapter 15.22; implementing the requirements of the Washington State Growth Management Act, including RCW 36.70A.060, RCW 36.70A.130, RCW 36.70A.170, and RCW 36.70A.172; completing the critical areas component of the City's 2025 Comprehensive Plan Periodic Update through the inclusion of best available science in designating and protecting critical areas; and establishing an effective date. WHEREAS, the City of Port Angeles first adopted a Growth Management Act-compliant Comprehensive Plan on June 28, 1994, and most recently amended the Comprehensive Plan on December 16, 2025; and WHEREAS, the City of Port Angeles first adopted a Growth Management Act-compliant Critical Areas Ordinance on November 29, 1991, and most recently amended the Critical Areas Ordinance on December 20, 2016; and WHEREAS, in accordance with RCW 36.70A.130(5)(b), the Growth Management Act requires the City to develop and adopt a comprehensive plan containing elements that sets forth the goals and policies to guide the future development of the City for the succeeding 20-year period; the City completed a periodic update of the Comprehensive Plan and ensured continued compliance with the Washington State Growth Management Act (GMA) on December 16, 2025; and WHEREAS, the City issued a Draft Environmental Impact Statement for the 2025 Comprehensive Plan on September 18, 2025, provided a 30-day comment period, and a Final Environmental Impact Statement on December 9, 2025; and WHEREAS, the Port Angeles Planning Commission held properly noticed public hearing on October 22, 2025, for the 2025 Comprehensive Plan; and recommended that the City Council approve the Vision 2045 Comprehensive Plan by a vote of 4-0 after the conclusion of the October 22, 2025 public hearing; and WHEREAS, the Port Angeles City Council held first and second readings on November 18, 2025, and December 16, 2025, for the Vision 2045 Comprehensive Plan (CPA 25-0004) and approved the Vision 2045 Comprehensive Plan (CPA 25-0004) by a vote of 7-0; and WHEREAS, the City Council, having considered the entire public record, public comments, written and oral, and the Port Angeles Planning Commission's recommendation, and made amendments to that recommendation it deemed appropriate, finds that the 2025 Comprehensive Plan, as recommended by the Planning Commission and amended by the City Council, adopted on December 16, 2025, is consistent with the Growth Management Act, is in the best interests of the citizens of the City of Port Angeles’, and should serve as the City of Port Angeles’ Comprehensive Plan for the succeeding 20 years; and November 4, 2026 G - 7 Attachment 1 2 WHEREAS, the City of Port Angeles adopted amendments to its development regulations through Municipal Code Amendment (MCA) 26-0180 on August 18, 2026, and the adoption of MCA 26-0090 is intended to complete the remaining Critical Areas Ordinance component of the City's 2025 Comprehensive Plan Periodic Update and bring the City's development regulations into compliance with applicable Growth Management Act periodic update requirements; and WHEREAS, the City recognizes the importance of government-to-government coordination with affected federally recognized tribes and the protection of treaty-reserved rights and resources, including fish and wildlife habitat; and the proposed regulations establish procedures for Tribal notification and consultation regarding development proposals that may affect designated critical areas and associated ecological functions; and WHEREAS, the City of Port Angeles is concluding the City’s Periodic Update with MCA 26- 0090 through the updates to the Critical Areas Ordinance and is now compliant with all development regulations as required by the Washington State Department of Commerce for the Periodic Update of the Comprehensive Plan and Critical Areas Ordinance as detailed in the following findings: 1. In accordance with RCW 36.70A.060(2), adopted under this Ordinance are development regulations that protect critical areas that are required to be designated under RCW 36.70A.170, identified as wetlands, critical aquifer recharge areas, frequently flooded areas, geologically hazardous areas, and fish and wildlife habitat conservation areas. 2. In accordance with RCW 36.70A.060(3), critical areas designations and development regulations were reviewed when adopting the Vision 2045 Comprehensive Plan under RCW 36.70A.040 and associated development regulations were reviewed and amended to ensure consistency. 3. In accordance with RCW 36.70A.106(3)(a), the amendments for permanent changes to the critical areas development regulation were submitted to the Department of Commerce on September 3, 2026, at least sixty days prior to final adoption. 4. In accordance with RCW 36.70A.172 and WAC 365-195, adopted under this ordinance for MCA 26-0090, the City has included best available science in developing the proposed critical areas regulations, considered the functions and values of the five designated critical area types, and given special consideration to conservation and protection measures necessary to preserve or enhance anadromous fisheries. The City has also considered applicable state agency guidance, local environmental conditions, and the need to establish reasonable and effective development standards consistent with the Growth Management Act. 5. In accordance with WAC 365-196-830, the City has designated critical areas and adopted regulations for the protection of the functions and values of these areas through the creation of Chapter 15.22 – Critical Areas of the Port Angeles Municipal Code. November 4, 2026 G - 8 Attachment 1 3 6. In accordance with WAC 365-195-905, the City has used information provided by local, state, and federal agencies that has been determined to represent the best available science consistent with the criteria set out in WAC 365-195-900 through 365-195-925. 7. In accordance with RCW 36.70A.172 and WAC 365-195-915, the best available science used for wetlands protection was from the Department of Ecology’s Wetland Guidance For Critical Areas Ordinance Updates, Publication #22-06-014. 8. In accordance with RCW 36.70A.172 and WAC 365-195-915, the best available science used for critical aquifer recharge areas protection was from the Department of Ecology’s Critical Aquifer Recharge Areas Guidance, Publication #05-10-028. 9. In accordance with RCW 36.70A.172 and WAC 365-195-915, the best available science used for frequently flooded areas protection was from FEMA Region 10, Floodplain Habitat Assessment and Mitigation Regional Guidance for the Puget Sound Basin, Effective Flood Insurance Rate Maps from FEMA, A Methodology for Delineating Planning-Level Channel Migration Zones from the Department of Ecology, and Land Use Planning for Salmon, Steelhead and Trout from the Washington Department of Fish and Wildlife, and the development regulation for Flood Damage Prevention previously adopted under Ordinance 3747 on April 15, 2025. 10. In accordance with RCW 36.70A.172 and WAC 365-195-915, the best available science used for geologically hazardous areas was from the Department of Natural Resources Geologic Planning and Geologic Information Portal. 11. In accordance with RCW 36.70A.172 and WAC 365-195-915, the best available science used for fish and wildlife habitat conservation areas was from the Washington Department of Fish and Wildlife Riparian Ecosystems Volume 1: Science Synthesis and Management Implications and Volume 2: Management Recommendations, and the Priority Habitats and Species Program. WHEREAS, on September 3, 2026, the City transmitted a copy of the proposed Ordinance to the Washington State Department of Commerce in accordance with RCW 36.70A.106 at least 60 days in advance of adoption for the required 60-day state review period; and WHEREAS, on September 23, 2026, the City Planning Commission held a duly noticed public hearing on MCA 26-0090 Critical Areas Ordinance Updates, accepted testimony, and made a recommendation to approve MCA 26-0090 to the City Council; and WHEREAS, the City conducted an extensive public engagement process, including City Council work sessions, Planning Commission meetings and a public hearing, and opportunities for written and oral public comment; and November 4, 2026 G - 9 Attachment 1 4 WHEREAS, the City received and reviewed 365 public and agency comments throughout the Critical Areas Ordinance update process, and considered the comments and recommendations received in developing and refining the proposed regulations; and WHEREAS, the City Council recognizes the importance of establishing critical areas regulations that are consistent with best available science, provide clear and predictable development standards, and balance environmental protection with reasonable property use and development opportunities consistent with applicable law; and WHEREAS, the City Council finds that adoption of MCA 26-0090 implements and furthers the goals of the Vision 2045 Comprehensive Plan; and WHEREAS, the City Council finds that adoption of MCA 26-0090 completes the Critical Areas Ordinance update as required by RCW 36.70A.060(3). NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN AS FOLLOWS: Section 1. – Findings, Adoption of Attachments. Chapter 15.02 of the Port Angeles Municipal Code is hereby amended; Chapters 15.20 and 15.24 are hereby struck in their entirety and replaced with a new Chapter 15.22 of the Port Angeles Municipal Code as shown in Exhibit A, attached hereto, and together with the “whereas” clauses and findings above, are incorporated herein by this reference. Section 2. – Classification. The Critical Areas development regulation set forth by this Ordinance is of a general and permanent nature and shall be kept on file with the City Clerk, available for public inspection. Section 3. - Corrections. The City Clerk is authorized to make necessary corrections to this Ordinance, including, but not limited to, the correction of scrivener’s clerical errors, references to other local, state, federal laws, codes, rules, or regulations, or Ordinance numbering, section/subsection numbers, and any references thereto. Section 4. - Severability. If any provisions of this Ordinance, or its application to any person or circumstance, are held invalid, the remainder of the Ordinance, or application of the provisions of the Ordinance to other persons or circumstances, is not affected. Section 5. Effective Date. This Ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum. This Ordinance shall take effect December 31, 2026. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the _____ day of ___________, 2026. November 4, 2026 G - 10 Attachment 1 5 _______________________ Kate Dexter, Mayor APPROVED AS TO FORM: _____________________________ Sheida Sahandy, City Attorney ATTEST: _____________________________ Kari Martinez-Bailey, City Clerk PUBLISHED: ___________________ By Summary November 4, 2026 G - 11 Attachment 2 MCA 26-0090 1 Title 15 Environment Underlined text indicates proposed additions. Struck text indicates proposed deletions. Please note the following color coordinated text for reference: Blue Text is existing language being proposed for relocation from a different section and has not been modified. Green Text is language from existing regulations that are being proposed for amendment. Black Text is new language entirely. CHAPTER 15.02 DEFINITIONS 15.02.010 Definitions. These definitions must apply to Chapters 15.22 and 15.26 15.20, 15.24 and 15.28, additional definitions are may be located in individual chapters. A. “Agricultural activities, existing and ongoing ” means those activities conducted on lands defined in RCW 84.34.020(2), and those activities involved in the production of crops and livestock, including but not limited to operation, maintenance and conservation measures of farm and stock ponds or drainage ditches, irrigation systems, changes between agricultural activities, and normal operation, maintenance or repair of existing serviceable structures, facilities or improved areas. Activities that bring an area into agricultural use are not part of an ongoing activity. An operation ceases to be ongoing when the area in which it was conducted is proposed for conversion to a non -agricultural use or has lain idle for a period of longer than five years, unless the idle land is registered in a federal or state soils conservation program. B. “Anadromous fish” means a fish that is born in freshwater, spends much of its life in the sea, and returns to freshwater to spawn. C. “Aquifer recharge” is the infiltration of rainfall, snowmelt, infiltration from lakes, wetlands and streams, or irrigation water into the ground that adds to the underground water that can supply a well. D. “Aquifers used for potable water” are existing wells and their protection areas, sole source aquifers, and aquifers otherwise identified as important supplies. They should be identified by looking at existing and future planned uses. E. “Best available science” means That the current scientific information derived from a valid scientific process applicable to the critical area prepared by local, state or federal natural resource agencies , a qualified scientific professional or team of qualified scientific professionals, that is consistent with criteria established in WAC 365-195-900 through WAC 365-195-925 used in the process to designate, protect, and/or restore critical areas. F. “Best management practices (BMPs)” means physical or structural tools and/or management conservation practices or systems of practices and management measures that: , which, when used singularly or in combination, prevent or reduce adverse impacts to the functions and values of critical areas and their buffers, including: 1. Control soil loss and reduce water quality degradation caused by high concentrations of nutrients, animal waste, toxics, and sediment; November 4, 2026 G - 12 Attachment 2 MCA 26-0090 2 2. Minimize adverse impacts to surface water and groundwater flow, circulation patterns, and the chemical, physical, and biological characteristics of wetlands; 3. Protect trees and vegetation designated to be retained during and following site construction and use native plant species appropriate to the site for re-vegetation of disturbed areas; and 4. Provide standards for proper use of chemical herbicides within critical areas. G. “Buffer” means an undisturbed area adjacent to a critical area that is required to remain in an undisturbed and untouched condition to protect the functions and values of the critical area , unless otherwise exempted, allowed, or permitted by this chapter. H. “Compensatory mitigation” means the restoration (re-establishment or rehabilitation), establishment (creation), enhancement, and/or in certain circumstances preservation of wetlands for the purposes of offsetting unavoidable adverse impacts that remain after all appropriate and practic able avoidance and minimization has been achieved. I. “Cowardian classification” means a commonly used classification system for wetlands first developed in 1979 by the US Fish and Wildlife Service and updated in 2013. The Cowardian system classifies wetlands based on water flow, substrate types, vegetation types, and dominant plant species. It is used for wetland classification in the National Wetland Inventory. J. “Critical aquifer recharge areas” are areas with a critical recharging effect on aquifers used for potable water, including areas where an aquifer that is a source of drinking water is vulnerable to contamination that would affect the potability of the water, or is susceptible to reduced r echarge. K. “Critical areas” means “wetlands”, “critical aquifer recharge areas”, “fish and wildlife habitat conservation areas”, “frequently flooded areas”, and “geologically hazardous areas”. L.C. “Critical habitat” means habitat necessary for the survival of endangered, threatened, rare, sensitive, or monitor species as identified under the Endangered Species Act. M. “Cumulative impacts” means the impact on the environment that results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (federal or non-federal) or person undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time. N. D. “Development” means any activity upon the land consisting of construction or alteration of structures, earth movement, dredging, dumping, grading, filling, driving of piles, drilling operations, bulkheading, clearing of vegetation, or other land disturbance. Development includes the storage or use of equipment or materials inconsistent with the existing use. Development also includes approvals issued by the City that binds land to specific patterns of use, including zoning changes, conditional use permits, and binding site plans. Development activity does not include the following activities: 1. Interior building improvements. 2. Exterior structure maintenance activities, including painting and roofing. 3. Routine landscape maintenance of established, ornamental landscaping, such as lawn mowing, pruning, and weeding. 4. Maintenance of the following existing facilities that does not expand the affected areas: individual utility service connections; and individual cemetery plots in established and approved cemeteries. O. “Emergency” means those activities necessary to prevent an immediate threat to public health, safety, or welfare, or that pose an immediate risk of damage to private property and that require remedial or preventative action in a timeframe too short to allow for compliance with the requirements of th e critical areas regulations. Once the immediate threat has been addressed, any adverse impacts on critical areas must be minimized and mitigated per the requirements of this chapter. November 4, 2026 G - 13 Attachment 2 MCA 26-0090 3 P.E. “Engineer” means a professional civil engineer, licensed by and in good standing in the State of Washington. Q. “Enhancement” means the manipulation of the physical, chemical, or biological characteristics of a wetland to heighten, intensify, or improve specific function(s) or to change the growth stage or composition of the vegetation present. Enhancement is undertaken for speci fied purposes such as water quality improvement, flood water retention, or wildlife habitat. Enhancement results in a change in some wetland functions and can lead to a decline in other wetland functions but does not result in a gain in wetland acres. Activities typically consist of planting vegetation, controlling non -native or invasive species, modifying site elevations or the proportion of open water to influence hydroperiods, or some combination of these activities. R. F. “Erosion” means the wearing away of the land or ground surface by the action of wind, water, ice, gravity, or any combination thereof. S. “Erosion hazard areas” are those areas containing soils which, according to the United States Department of Agriculture Natural Resources Conservation Service Soil Survey Program, may experience significant erosion. Erosion hazard areas also include coastal erosion-prone areas and channel migration zones. T. “Establishment (or creation)” means the manipulation of the physical, chemical, or biological characteristics present to develop a wetland on an upland or deepwater site where a wetland did not previously exist. Establishment results in a gain in wetland acres. Activities typically inv olve excavation of upland soils to elevations that will produce a wetland hydroperiod, create hydric soils, and support the growth of hydrophytic plant species. G. “Exotic” means any species of plant or animal that are not native to the area. U. “Fish and wildlife habitat conservation areas” are areas that serve a critical role in sustaining needed habitats and species for the functional integrity of the ecosystem, and which, if altered, may reduce the likelihood that the species will persist over the long term. These areas may include, but a re not limited to, rare or vulnerable ecological systems, communities, and habitat or habitat elements including seasonal ranges, breeding habitat, winter range, and movement corridors; and areas with high relat ive population density or species richness. These areas do not include such artificial features or constructs as irrigation delivery systems, irrigation infrastructure, irrigation canals, or drainage ditches that lie within the boundaries of, and are maintained by, a port district or an irrigation district or company. V. “Floodplain” means the total area subject to inundation by the base flood. W. H. “Frequently flooded areas” means are lands in the floodplain subject to at least a one percent or greater chance of flooding in any given year (the 100-year storm flood), or within areas subject to flooding due to high groundwater. These areas include but are not limited to streams, rivers, lakes, coastal areas, wetlands, and the like areas where high groundwater forms ponds on the ground surface. X. “Functions and values” means the ecosystem services provided by critical areas to society, including, but not limited to, improving and maintaining water quality, providing fish and wildlife habitat, supporting terrestrial and aquatic food chains, reducing flooding and erosive flows, wave attenuation, carbon sequestration, thermal refugia, historical or archaeological importance, cultural uses and significance, educational opportunities, and recreation. Y. “Geologically hazardous areas” are areas that because of their susceptibility to erosion, sliding, earthquakes, or other geological events, are not suited to siting commercial, residential, or industrial development consistent with public health or safety concerns. Z. “Habitats of local importance” means fish and wildlife habitat conservation areas that are found to be of significance to the City of Port Angeles. November 4, 2026 G - 14 Attachment 2 MCA 26-0090 4 AA. “Hazard tree” means a tree that has been determined by an International Society of Arboriculture (ISA) Certified Arborist with a valid Tree Risk Assessment Qualification, to be a hazard to people, property, or infrastructure as a result of a risk assessment conducted according to ISA guiding principles. I. “Historic condition” means the condition of the land, including flora, fauna, soil, topography, and hydrology that existed before the area and vicinity were developed or altered by human activity. BB. J. “Hydraulic project approval (HPA)” means a permit issued by the state Department of Fish and Wildlife for modifications to waters of the state in accordance with Chapter 75.20 77.55 RCW. CC. “Impervious surface” means a surface area that either prevents or slows the entry of water into the soil or other substrate that would occur under natural conditions prior to development. A non-vegetated surface area that causes water to run off the surface in greater quantit ies or at an increased rate of flow from the flow present under pre-development or pre-developed conditions. DD.K. “Indigenous” means any species of plant or animal native to an area. Not introduced. EE.L. “Infiltration” means the downward entry of water into the immediate surface of soil. FF. “Invasive species” means an organism that is not native to a specific ecosystem and whose introduction causes or is likely to cause harm to the environment, economy, or human, animal, or plant health. GG.M. “Joint aquatic resource permits application (JARPA)" means a single application form that may be used to apply for hydraulic project approvals, shoreline management permits, Department of Natural Resources use authorization, and Army Corps of Engineers permits. HH.N. “Land-disturbing activity” means any use of the land activity that results in the movement of earth, or a change in the existing natural cover (both vegetative and non-vegetative) and/or the existing soil topography, that may cause or contribute to erosion or sedimentation or a reduction in aquifer recharge or altered wetland hydrology. Land disturbing activities include, but are not limited to, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction will also be considered a land disturbing activity. Minor soil disturbance for site- investigation purposes, routine garden maintenance of lawfully established gardens, and non- destructive vegetation management are not considered land-disturbing activities.: 1. Change in the natural cover or topography that exposes soils or 2. May cause or contribute to erosion or sedimentation. This does not include nondestructive vegetation trimming. II. “Landslide hazard areas” are areas at risk of mass movement due to a combination of geologic, topographic, and hydrologic factors. JJ. “Locally unique features” means landforms and features that are important to the Character of the City of Port Angeles and the adjoining Port Angeles Urban Growth Area. These features or landforms often contain one or more critical area. Locally unique features in the Port Angeles region include ravines, marine bluffs, and beaches and associated coastal drift processes. KK.P. “Native” means any species of plants or animals that are indigenous to the area. LL. “No net loss” of critical area functions and values means the maintenance of existing ecological functions and habitat conditions over time. It ensures that planned developments do not result in a decline of ecosystem functions and values by mandating strict adherence to sequential mitigation. MM.Q. “Nondestructive vegetation trimming” means the trimming, or pruning of trees, shrubs, or plants, that does not harm the continued life and health of the plant and uses best management practices for pruning as defined by the International Society of Arboriculture. NN. “Ordinary high water mark” means the mark which is found by examining the bed and banks of water bodies and ascertaining where the presence and action of waters are so common and usual, and so November 4, 2026 G - 15 Attachment 2 MCA 26-0090 5 long continued in all ordinary years, that the soil has a character distinct from that of the abutting upland in respect to vegetation. OO.R.“Priority habitat”s means a habitat types or elements with unique or significant value to one or more species as classified by the Washington Department of Fish and Wildlife. A priority habitat may consist of a unique vegetation type or dominant plant species that is of primary importance to fish and wildlife such as eelgrass meadows, a described successional stage such as old-growth and mature forests, or a specific structural element such as a consolidated marine/estuarine shoreline or habitat snags. (WAC 173-26-020(3430). PP. “Priority species” means species requiring protective measures and/or management guidelines to ensure their persistence at genetically viable population levels, as defined by the Washington Department of Fish and Wildlife, that meet any of the criteria outlined in WAC 173-26-020(31)(a-d). QQ.S. “Puget Sound” means all salt waters of the State of Washington inside the international boundary line between the State of Washington and the Province of British Columbia, lying east of 123 degrees, 24 minutes west longitude and includes the Strait of Juan de Fuca. RR.T. “Qualified professional” means a person with relevant training, professional experience, and/or specific academic degrees or state licenses in the pertinent scientific discipline related to the critical area in question. experience and training in the applicable critical area. A qualified professional must have obtained a B.S. or B.A. or equivalent degree in biology, engineering, environmental studies, fisheries, geomorphology, or related field, and two years of related professional work experience. 1. A qualified professional for fish and wildlife habitats or wetlands must have a degree in biology, marine biology, wetland biology, or habitat ecology. 2. A qualified professional for a geologically hazardous area must be a professional civil engineer or geologist, licensed in the State of Washington. 3. A qualified professional for tree maintenance and tree pruning must be an arborist certified by the International Society of Arboriculture. SS. “Protection/Maintenance (or Preservation)” means removing a threat to, or preventing the decline of, wetland conditions by an action in or near a wetland. This includes the purchase of land or easements, repairing water control structures or fences, or structural protection such as repairing a barr ier island. This term also includes activities commonly associated with the term preservation. Preservation does not result in a gain of wetland acres, may result in a gain of functions, and will be used only in exceptional circumstances. TT. “Re-establishment” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former wetland. Re -establishment results in a gain in wetland acres (and functions). Activities could include removing fill material, plugging ditches, or breaking drain tiles. UU. “Reference condition” means a baseline standard, benchmark, or set of normal measurements used to compare and evaluate the health, quality, or performance of an ecosystem, environment, or scientific system. VV. “Rehabilitation” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural or historic functions of a degraded wetland. Rehabilitation results in a gain in wetland function but does not result in a gain in wetland acres. Activities could invoice breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. WW. “Restoration” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former or degraded wetland. For the purpose of tracking net gains in wetland acres, restoration is divided into re-establishment and rehabilitation. November 4, 2026 G - 16 Attachment 2 MCA 26-0090 6 XX. “Riparian area” means the area that encompasses both sides of a water body, composed of aquatic ecosystems, riparian ecosystems, and riverine wetlands. YY. “Riparian management zone (RMZ)” means the area that has the potential to provide full riparian functions, often synonymous with the riparian buffer. This area occurs within one 200 -year site potential tree height measured from the edge of the stream channel. In places where the site potential tree height is less than 100 feet, the RMZ is set at 100 feet to provide for the pollution removal function. ZZ. “Seismic hazard areas” are areas subject to severe risk of damage as a result of earthquake -induced ground shaking, slope failure, settlement, soil liquefaction, debris flows, lahars, or tsunamis. AAA. “Setback” means the required minimum distance for any use, structure, or building from a hazard critical area or its buffer that establishes the building envelope within which any structure or building may be erected or placed. as required by a qualified professional to protect safety for occupants of a development and/or users of a site. BBB. “Site potential tree height” means the average maximum height of the tallest dominant trees for a given age and site class. CCC. U “Topping or tree topping” means the indiscriminate cutting back of tree branches to stubs or lateral branches that are not large enough to assume the terminal role and is harmful to the life and health of the plant. Other names for topping include “heading”, “crowning”, or “tipping”. DDD.V. “Viewshed enhancement” means the removal or non-destructive thinning of trees or vegetation to enhance a view when proposed in ravine and marine bluff critical areas or their associated buffers so long as such alterations will not: 1. Increase geological hazards such as erosion potential, landslide potential, or seismic hazard potential as demonstrated by a qualified professional; 2. Adversely affect significant fish and wildlife habitat areas; 3. Through thinning, remove more than 30 25 percent of the live branches of a tree’s canopy; 4. Include felling, topping, or removal of trees in critical areas. Viewshed enhancement does not include nondestructive trimming of vegetation as defined in this title. EEE. “Watercourse” means any portion of a stream or river channel, bed, bank, or bottom waterward of the ordinary high water line of waters of the state. Watercourse also means areas in which fish may spawn, reside, or pass, and tributary waters with defined bed or banks that influence the quality of habitat downstream. Watercourse also means waters that flow intermittently or that fluctuate in level during the year, and the term applies to the entire bed of such waters whether or not the water is at peak level. This includes all surface-water-connected wetlands that provide or maintain habitat that supports fish live. This definition does not include irrigation ditches, canals, stormwater treatment and conveyance systems, or other entirely artificial watercourses, except where they exist in a natural watercourse that has been altered by humans. FFF. “Wetland or wetlands” means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. However, wetlands may include those artificial wetland s intentionally created from non- wetland areas to mitigate conversion of wetlands, if permitted by the county or city. November 4, 2026 G - 17 Attachment 2 MCA 26-0090 7 CHAPTER 15.20 ENVIRONMENTALLY SENSITIVE AREAS PROTECTION (MOVED TO CHAPTER 15.22) Chapter 15.20 is hereby deleted in its entirety and moved to a new chapter 15.22 for replacement. CHAPTER 15.22 CRITICAL AREAS ARTICLE I. GENERAL PROVISIONS 15.22.010 Purpose. A. The purpose of this chapter is to designate critical areas and to establish standards for the protection of and, where feasible, enhancement of, their functions and values, in compliance with the provisions of the Washington State Growth Management Act of 1990, and consistent with the goals and policies of the City of Port Angeles Comprehensive Plan, Climate Resiliency Plan, and Climate Resiliency Implementation Plan. B. By identifying and regulating development and alterations to critical areas and their buffers, this chapter seeks to accomplish the following goals: 1. Protect the public health, safety and welfare by avoiding disturbance of critical areas, minimizing unavoidable impacts, and mitigating impacts where necessary; 2. Protect the public from personal injury, loss of life or property damage due to flooding, erosion, landslides, seismic events, or soil subsidence; 3. Protect against publicly financed expenditures in the event critical areas are misused, which causes: a. Unnecessary maintenance and replacement of public facilities; b. Publicly funded mitigation of avoidable impacts; c. Cost for public emergency rescue and relief operations where the causes are avoidable; or d. Degradation of the natural environment. 4. Protect the public trust in navigable waters and aquatic resources; 5. Prevent cumulative adverse impacts to water availability, water quality, wetlands, fish and wildlife habitat, and the overall net loss of wetlands, frequently flooded areas, and habitat conservation areas; 6. Protect unique, fragile, and vulnerable elements of the environment, including wildlife and its habitat; 7. Alert appraisers, assessors, owners, potential buyers, or lessees to the development limitations of critical areas; and 8. Implement the policies of the State Environmental Policy Act (SEPA), Chapter 43.21C RCW; the City of Port Angeles Comprehensive Plan; this chapter of the Port Angeles Municipal Code; and all updates and amendments, functional plans, and other land use policies formally adopted or accepted by the City of Port Angeles. C. The regulations of this chapter are intended to protect critical areas in accordance with the Growth Management Act, through the application of best available science, as determined according to WAC 365 - 195-900 through 365-195-925, and in consultation with state and federal agencies and other qualified professionals. D. This chapter is intended to be administered with limited flexibility and attention to site-specific characteristics. It is not intended to make a parcel of property unusable by denying its owner reasonable economic use of the property, or to prevent the provision of public facilities and services necessary to November 4, 2026 G - 18 Attachment 2 MCA 26-0090 8 support existing development and that planned for by the community without decreasing current service levels below minimum standards. E. The city’s enactment or enforcement of this chapter must not be construed for the benefit of any individual person or group of persons other than the general public. 15.22.020 Applicability. Unless explicitly exempted, the provisions of this chapter apply to all land uses, development activity, and all structures and facilities within the City of Port Angeles that are within a critical area, within the maximum buffer distance of, or likely to affect the functions and values of one or more critical areas. Responsibility for administration and enforcement of the provisions of this chapter must rest with the Director of Community and Economic Development or their designee. A. Relationship to Other Regulations. 1. Shorelines of the state as defined in RCW 90.58.030, and critical areas occurring within the jurisdiction of shorelines of the state, are regulated and protected through the City of Port Angeles Shoreline Master Program (PAMC Chapter 15.08), as amended. Activities occurring within the shoreline jurisdiction are reviewed through the shoreline permit review and issuance process; a separate critical areas permit is not required. 2. These critical areas regulations apply in addition to zoning and other regulations adopted by the City. In the event of any conflict between these regulations and any other regulations of the City, the regulations apply that provide greater protection to the critical areas’ functions and values . 3. When any provision of this chapter or any existing easement, covenant, or deed restriction conflicts with this chapter, that which provides more protection to the critical area applies. 4. Compliance with the provisions of this chapter does not constitute compliance with other federal, state, or local regulations and permit requirements. The applicant is responsible for complying with other agency requirements, apart from the process established in this chapter. 15.22.025 Tribal Consultation A. Notice. Within ten (10) days after a complete application, the Director must send notice and the application materials to each affected tribe for any proposal in or near a stream, riparian management zone, wetland, fish and wildlife habitat conservation area, floodplain, or critical aquifer recharge area, and for any reasonable use exception, variance, buffer reduction, or mitigation or restoration plan . Notice of proposed amendments to this chapter must also be sent. B. Review. Each tribe has thirty days from notice to comment. The Director may grant a longer period on request. C. Response. The Director must respond in writing to timely comments and must state in the decision how each was addressed, including the reasons for any comment not adopted. D. Effect. This section provides for consultation only. It does not delegate the City’s decision -making authority, and a tribe’s participation or silence does not waive any treaty right. The City will not disclose culturally sensitive site information provided by a tribe, to the extent the law allows. 15.22.030 Identification, classification, and rating of Critical Areas. A. Critical Area Maps. The approximate distribution and extent of critical areas in the City are displayed on the City of Port Angeles’ critical areas maps. The maps are used to alert the public and City officials of the potential locations of critical areas and should act as a screening tool. As new information related to critical areas becomes available, the City is authorized to make changes as necessary to the critical area maps. Given that critical areas and the processes that define them are dynamic, qualified professionals must determine the actual presence and November 4, 2026 G - 19 Attachment 2 MCA 26-0090 9 location of critical areas and ensure they are protected in accordance with all provisions of this chapter, rather than relying on the generalized nature of the City's maps. If any of the critical areas shown on the maps conflict with the criteria set forth in this chapter, the criteria must control the designation of the critical area. B. Actual Site Conditions. Regardless of whether a critical area is shown on the critical areas map, the actual presence or absence of the features defined in this code as critical areas will govern. The exact location of the boundary of a critical area must be determined through the performance of a field investigation as performed by a qualified professional, applying the definitions and criteria provided in this chapter, as determined necessary by the City. C. Classification and Rating. To promote consistent application of the standards and requirements of this chapter, critical areas within the City will be rated or classified using best available science according to their characteristics, functions and values, and/or their sensitivity to disturbance. 1. Classification of critical areas will be determined by the City using the following tools: a. Application of the criteria contained in these regulations; b. Consideration of the critical area reports submitted by qualified professionals in connection with applications subject to these regulations; and c. Review of maps and other resource adopted pursuant to this chapter. 2. Rating categories will not change due to illegal modifications of the critical area or its buffer. If the development proposal site contains or is within a critical area or buffer suspected of illegal modifications, the rating will be based on pre-modification conditions. Abatement of the unauthorized modification will be required prior to authorization of the current development proposal being processed for the subject site. 15.22.040 Protection of Critical Areas and Best Available Science. A. Critical areas and their required buffers may not be altered except as otherwise provided by this chapter. B. Any action taken pursuant to this chapter must result in equivalent or greater functions and values of the critical area associated with the proposed action, as determined by the best available science. No activity or use may be allowed that results in a net loss of the functions or values of critical areas. Special consideration must be given to conservation or protection measures necessary to preserve or enhance anadromous fish , such as salmon, steelhead, and cutthroat trout, and their habitat. C. All proposed actions and development must be designed and constructed in accordance with mitigation sequencing per PAMC 15.22.130 to achieve no net loss of critical area functions and values. Compliance with mitigation sequencing is required but does not entitle a proposal to approval. A proposal that cannot achieve no net loss, or that fails another standard of this chapter must be modified or faces denial. D. Applicants must first demonstrate an actual inability to avoid or minimize impacts before restoration and compensation of impacts will be allowed. E. Any individual critical area adjoined by another type of critical area must have the buffer and meet the requirements that provide the most protection to the critical areas involved. F. Each day a violation of this chapter occurs or continues constitutes a separate offense and is subject to enforcement and penalties under PAMC 2.90. 15.22.050 Project evaluation. A. As part of the review, the City will: 1. Verify the information submitted by the applicant is complete and accurate; 2. Evaluate the project area and vicinity for any potential critical areas; November 4, 2026 G - 20 Attachment 2 MCA 26-0090 10 3. Determine whether the proposed project is likely to impact the functions or values of critical areas; and 4. Determine if the proposed project adequately addresses the impacts and follows the proper mitigation sequence to avoid, minimize, and mitigate the impacts. B. If the proposed project is within, adjacent to, or is likely to impact a critical area, the City will: 1. Require a critical area report from the applicant that has been prepared by a qualified professional, to be reviewed and evaluated; 2. Determine whether the development proposal conforms to the purposes and performance standards of this chapter, including the criteria in PAMC 15.22.060, Critical Areas Review; 3. Assess the potential impacts to the critical area and determine if they can be avoided or minimized; and 4. Determine if any mitigation proposed by the applicant is sufficient to protect the functions and values of the critical area, and the public health, safety, and welfare concerns consistent with the goals, purposes, objectives, and requirements of this chapter. C. The City may require third party review of any critical area report at the expense of the applicant. 15.22.060 Critical areas review. A. When required. A proposal to modify any critical area and/or the associated buffer including, but not limited to, clearing, grading, draining, removal or alteration of vegetation, construction of structures, utilities and related infrastructure, requires a critical area permit unless it qualifies as an exemption as provided in PAMC 15.22.070. B. Best Management Practices. All activities, including those allowed without full critical areas review, must be conducted using the best management practices appropriate for that activity that result in the least amount of impact to the critical area. Best management practices must be used for tree and vegetation protection, construction management, erosion and sediment control, water quality protection, and regulation of chemical applications to ensure the activity does not result in degradation to the critical area. Any incidental damage to, or alteration of, a critical area and/or buffer must be restored, rehabilitated, or replaced at the responsible party’s expense. C. Modifications to existing nonconforming structures and uses. Existing structures, activities, and uses that were established legally but do not meet the current critical area, buffer, or buffer setback requirements may continue in accordance with PAMC 17.95, nonconforming situations. The burden of proof is on the applicant to bring evidence in support of their position. The following modifications to existing nonconforming structures and uses are allowed: 1. Routine maintenance and repairs; 2. Structural modifications or additions that do not intensify the nonconformity of the structure or increase the area of hardscape within the critical area or buffer. The Director may, at their discretion, require an updated critical area report to confirm locations of buffers and that the modification is located entirely outside the critical area or buffer. If a use is discontinued for twelve months, or improvements exceed a value threshold set by the City in any five-year period, the site must be brought into compliance; 3. Vertical additions above the ground floor that do not encroach further into the critical area or buffer beyond the existing exterior walls, except for additions in geologically hazardous areas that warrant further critical areas review. 4. Restoration or replacement of a structure that is damaged by fire or other natural disaster, except that critical areas review is required when located in a critical area or buffer, when: November 4, 2026 G - 21 Attachment 2 MCA 26-0090 11 a. A complete application for reconstruction or replacement is submitted within one year of the damage; and b. The restoration or replacement is made to conform to the current critical areas regulations, or if such regulations cannot be physically met without reducing the size of the structure, the restoration or replacement may not intensify any nonconformity that existed prior to the damage. 5. The demolition of structures located within critical areas or their buffers is permitted, excluding demolition of structures necessary to support or stabilize landslide or erosion hazard areas, subject to approval of a demolition permit, and a stormwater pollution prevention plan consistent with the adopted stormwater management manual. a. Disturbed areas must be stabilized and revegetated with native species. Later new construction may not rely on the footprint of the demolished structure, except as allowed under subsection 4. 15.22.070 Exempt activities. A. General requirements for all exempt activities. Activities listed in this section are exempt from the remaining provisions of this chapter only if they meet the specific terms of this section. B. To be exempt from this chapter does not give permission to degrade a critical area or buffer or to ignore risk from natural hazards. All exempt activities must use reasonable methods to avoid potential impacts to critical areas and buffers. In every instance, disturbance to the critical area or buffer must be minimized through best management practices and the use of low-impact equipment. C. Any incidental damage to, or alteration of, a critical area or buffer that is not a necessary outcome of the exempted activity must be restored, rehabilitated, or replaced at the responsible party’s expense and will require the submittal of an approved mitigation plan. D. This chapter may not exempt an activity from the provisions of other city permits such as clearing and grading, or agency permit requirements such as a WDFW Hydraulic Project Approval, or US Army Corps of Engineers regulatory requirements. E. The burden of proof is on the applicant to bring forth evidence that the activity meets the precise description of the exemption pursuant to this section. F. The following activities are exempt from the provisions of this chapter, provided they meet the precise description stated herein. A written request must be submitted to the Director of Community and Economic Development and approved to be considered exempt. 1. Emergencies. Those activities necessary to prevent an immediate threat to public health, safety, or welfare or that pose an immediate risk of damage to private property that require remedial or preventative action in a timeframe too short to allow for compliance with the requirements of this chapter, if the following requirements are met: a. Only the minimum intervention necessary to reduce the risk to public health, safety, or welfare and/or the imminent risk of damage to private property may be authorized by this exemption. b. The alteration undertaken must be reported to the Director no later than 14 days after the alteration has occurred. Failure to report the alteration in the time allotted will result in an unauthorized critical area modification pursuant to section 15.22.190. The report must be prepared by a qualified professional and state findings that an emergency existed, what the smallest action taken to address the risk was, and determine what, if any, additional measures are required of the property owner to protect the critical area(s) consistent with the provisions of this chapter, and to mitigate any damage to a pre-existing state. c. After the emergency, the person or agency undertaking the action must fully fund and conduct necessary site evaluations and critical area reports, mitigation plans, and restoration for any November 4, 2026 G - 22 Attachment 2 MCA 26-0090 12 impacts to the critical area and buffers resulting from the emergency action pursuant to the review procedures of this chapter. Mitigation activities must be initiated within one year of the date of the emergency or as directed by the Department and be completed in a timely manner. d. If the Director determines that the action taken, or any part of the action taken, was beyond the scope of an allowed emergency action, or any required mitigation, the Director may take action to enforce the provisions of this chapter. 2. Passive outdoor activities. Low impact activities such as hiking, kayaking, fishing, bird watching, photography, education, or scientific research that do not involve modifying the land or vegetation, and that will not adversely affect the functions and values of the critical area or its buffer. 3. Trail maintenance. Maintenance, operation, repair, modification, or replacement of existing trails and trail-related facilities within publicly improved parks and recreation areas may be performed subject to the following: a. The activity does not involve the material expansion of facilities, disturbance to adjacent areas is minimized, and disturbed areas must be immediately restored; b. Work is conducted using best management practices; c. Biological characteristics of the critical area and its buffer are not impaired and adverse impacts are minimized; d. Where trail relocation is the least impactful method of repair, trail relocation, provided it is further away from the critical area, is not considered a new trail, but is included in the exemption for operation, maintenance, repair, or replacement. 4. Forest practices regulated by the State. Forest practices regulated and conducted in accordance with the provisions of Chapter 76.09 RCW and forest practices regulations, Title 222 WAC, except for conversions to non-forestry uses. 15.22.080 Allowed uses or activities. Allowed uses or activities are those uses or activities that are unlikely to result in an impact to the critical area or its buffer because of other regulations or previous reviews. The following activities are exempt from the critical areas review process, but not the protection standards set forth in this chapter; provided that the activity or use is conducted in accordance with the applicable standards noted below. A. All allowed activities must use mitigation sequencing and best management practices that result in the least amount of impact to the critical areas where practicable. Designation as an allowed activity does not give permission to degrade a critical area or ignore risk from natural hazards. Best management practi ces must be used for tree and vegetation protection, fish and wildlife protection, and regulation of chemical applications, all of which may be monitored by the City to ensure the activity does not result in degradation to the critical area or buffer. Any incidental damage to, or alteration of, a critical area that is not a necessary outcome of the allowed activity must be restored, rehabilitated, or replaced at the responsible party’s expense within one year of the disturbance to the satisfaction of the Director. B. The applicant must provide the Director of Community and Economic Development with an exemption request letter including drawings, plans, or other necessary documentation to determine whether additional City permits or approvals are needed to conduct the work. The letter must be submitted along with a critical area exemption application. C. Unless otherwise specified, approvals will be valid for one (1) year per activity allowed; provided that there is no change in the scope of the project, including, but not limited to, the location and/or extent of the activity allowed under the notification process. November 4, 2026 G - 23 Attachment 2 MCA 26-0090 13 D. Upon receipt of the application, the Director may condition and provide guidance on best management practices for tree and vegetation protection, construction management, erosion and sediment control, water quality protection, and use of chemical applications to be used in the execution of the following activities: 1. Site investigation. Minimal site investigative work and studies necessary for land use submittals, such as surveys, soil logs, percolation tests, water quality studies, scientific research, wildlife studies, and other related activities, where such activities do not require construction of new roads, removal of native trees or shrubs, and only minimal amounts of excavation and disturbed areas that must be immediately restored. 2. Projects previously reviewed for critical areas impacts. Development permits and approvals that involve both discretionary land use approvals and construction approvals that do not need to undergo a new critical areas review. 3. Minor additions to and modifications of existing structures. Existing structures or improvements that do not meet the requirements of this chapter may be remodeled, reconstructed, or replaced provided that the new construction does not further disrupt the critical area or its buffer. 4. Activities within the improved right-of-way. Replacement, modification, installation, or construction of utility facilities, lines, pipes, mains, equipment or appurtenances, when such facilities are located within the improved portion of the public right-of-way or a city authorized private roadway. Any activity that alters a wetland or watercourse or that may result in the transport of sediment or increased stormwater runoff must result in; a. Increased buffer widths equal to the width of the right-of-way improvement, including disturbed areas; and b. Retention and replacement of native vegetation or non-invasive, non-native vegetation along the right-of-way and resulting disturbance. 5. Operation, maintenance, or repair. The operation, maintenance, or repair of existing structures or infrastructure, provided the activity does not alter or increase impacts to critical areas and there is no increased risk to life or property. 6. Minor utility projects. Utility projects with minor or short-duration impacts to critical areas and no significant impact on the function or values of a critical area, provided such projects are constructed with best management practices and additional restoration measures. Such allowed minor utility projects must meet the following criteria: a. There is no practical alternative with less impact on the critical area; b. The activity involves the placement of a small utility facility such as a street sign or pole; and c. The activity involves disturbance of an area less than seventy-five (75) square feet of the critical area and/or its associated buffer. 7. Public and private pedestrian trails. Except for wetlands and fish and wildlife habitat conservation areas or their buffers, new public and private pedestrian trails may be allowed pursuant to the following criteria: a. Trails and related facilities must, to the extent feasible, be placed on existing levees, road grades, utility corridors, or any other previously disturbed areas; b. Trails and related facilities must be planned to avoid or minimize the removal of trees, shrubs, snags, and important wildlife habitat. When trees must be removed, a replacement plan must be developed in accordance with the requirements of this chapter; c. Trail construction and maintenance must follow best management practices and should be limited to pervious surfaces no more than five (5) feet in width and designed for pedestrian use only; November 4, 2026 G - 24 Attachment 2 MCA 26-0090 14 d. The trail surface must meet all other local, state, and federal requirements, including stormwater regulations. In areas where impervious trails and paths are used, permeable pavement must be used where feasible and must have a maintenance plan in place; e. Trails proposed in geologically hazardous areas must be constructed to not increase the risk of landslides or erosion in accordance with an approved geotechnical report prepared by a qualified professional; and f. Walkways and trails proposed in wetland buffers, provided they are limited to minor crossings having no adverse impact on water quality, must be positioned generally parallel to the perimeter of the wetland boundary, located only in the outer twenty-five percent (25%) of the wetland buffer area, and be located to avoid removal of significant, old gro wth, or mature trees. 8. Vegetation management practices. The following vegetation management practices within critical areas and their buffers may be permitted, provided vegetation removal or pruning is done in a manner that minimizes disturbance and prevents adverse effects on soil stability, fish and wildlife habitat, water quality, and water quantity. Any work that is found to be non-compliant with the provisions of this chapter will be subject to mitigation pursuant to the requirements in PAMC 15.22.140: a. Removal of noxious weeds or invasive vegetation, as identified by the Washington State or Clallam County Noxious Weed Control Board with hand labor and light equipment. Chemical applications of herbicides may be used in accordance with the state Department of Fish and Wildlife Management Recommendations, the state Department of Agriculture, and the US Environmental Protection Agency by a licensed applicator registered in the State of Washington; b. Vegetation management consistent with a previously approved mitigation, restoration, remediation, or habitat enhancement project, provided that increased erosion, landslide, or other adverse impacts to the critical area do not result, as prepared by a qualified professional. Previously approved plans are valid for a maximum of ten (10) years and must reference the best available science when prepared; c. Thinning of limbs of individual trees to provide for viewshed enhancement that will not: i. Increase geological hazards such as erosion potential, landslide potential, or seismic hazard potential, as demonstrated by a qualified professional; ii. Adversely affect fish and wildlife habitat conservation areas, including cumulative impacts to the functions and values of these areas; iii. Remove with appropriate pruning practices more than 25 percent of the live crown of a tree over the course of one growing season. Pruning must be in support of maintaining tree health and vigor and be in accordance with ANSI tree pruning practices. Tree topping is not an acceptable pruning practice; however, reduction may be utilized on deciduous trees only when approved by an ISA Certified Arborist as an acceptable practice. Window pruning is the preferred pruning method when feasible. iv. Include felling, topping, or removal of trees. If a violation of this subsection should occur, the landowner must replace any trees that are felled, topped, or removed with new trees at a ratio of 2:1 within one year of the action in accordance with an ap proved restoration plan. Tree species that are native to the site with a preference for drought tolerant species must be used. At least one of the replacement trees must be evergreen. d. Annual non-destructive pruning and trimming of vegetation for maintenance purposes in accordance with a valid, previously approved mitigation, restoration, remediation, or habitat enhancement report that utilizes best management practices consistent with the American National Standards Institute (ANSI) tree pruning standards as prepared by an ISA Certified Arborist. Tree topping is considered a destructive practice and is not allowed; November 4, 2026 G - 25 Attachment 2 MCA 26-0090 15 e. Removal of hazard trees. Trees that pose a threat to life, public safety, or private or public infrastructure, as demonstrated by an ISA Certified Arborist with valid Tree Risk Assessment Qualification credentials, may be removed from critical areas or their buffer. The Arborist must prepare a report to be submitted with the application that addresses the following: i. A site plan identifying the location of the hazard tree(s) and their proximity to the critical area and any nearby targets; ii. A conclusion that the condition of concern constitutes a high risk to the targets identified or a threat to life or property; iii. Recommendations for mitigating the risk and what the residual risk is for each target identified. Creation of a habitat snag is preferred over full tree removal, where and when feasible; iv. If a tree to be removed provides critical habitat, such as an eagle perch or occupied nest, a qualified professional must be consulted to determine timing and methods of removal that will minimize and mitigate impacts; v. If a tree to be removed is within a geologically hazardous area or buffer, an evaluation of potential impacts on slope stability must be accompanied by a qualified professional, including recommendations for avoiding adverse impacts to slope stability. vi. A restoration plan for any removed tree or vegetation that includes species, size, and a maintenance plan. Trees and vegetation must be replaced at a 2:1 ratio using appropriate native species suitable to the project site. At a minimum, 50 percent of the replacement trees must be evergreen species. 15.22.090 Permitted uses or activities. A. Applicability. Uses permitted on properties which contain an area classified as a critical area must be the same as those permitted in the underlying zone. Each use must be evaluated in accordance with the review process required for the proposed use in the underlying zone in conjunction with the requirements of this chapter, state, and federal regulations. Nothing in this chapter is intended to preclude reasonable use of property. B. Review process. 1. A Type II critical area development permit is required for all permitted uses or activities, consistent with Chapter 18.02 PAMC. No permit may be issued unless it can be shown that the proposed development is fully consistent with the requirements of this chapter. The burden of proof is on the applicant to bring forth evidence in support of the application and upon which any decision has to be made on the application. 2. In addition to other project-related documents, all permitted land uses and developments proposed in an area listed, identified, inventoried, classified, or rated as a critical area must require supporting reports or studies, prepared by a qualified professional to describe the environmental limitations of the site, consistent with the requirements of sections 15.22.110 and 15.22.120 PAMC. 3. No construction activity, including clearing and grading, may be permitted until the information required by this chapter is reviewed and approved by the City as adequate. C. In addition to the uses permitted in the underlying zone, the following land uses, activities, or developments are permitted pursuant to the requirements of this chapter. 1. Buffer modifications. An applicant may apply for buffer modifications including increased buffer width, buffer averaging, and buffer alterations of critical areas as described specifically by this chapter. 2. Previously altered critical areas. If any portion of a critical area or its associated buffer has been altered from its natural state, the applicant may propose to develop within the altered area pursuant to the November 4, 2026 G - 26 Attachment 2 MCA 26-0090 16 following decision criteria. This subsection does not apply to wetlands, streams, channel migration zones, or any portion of a riparian management zone that still performs riparian functions: a. The critical area was lawfully altered in accordance with the provisions of this chapter and any state and federal laws at the time the alteration occurred; b. The previous alteration has permanently disrupted the natural functions and values of the critical area, and the lost functions cannot easily be restored. A qualified professional must document using field data which functions remain, which are permanently lost, and which can be restored when applicable; c. The development proposal meets the avoidance and minimization steps of the mitigation sequence, and can demonstrate that the new alteration will not further disrupt the natural functions and values of the critical area; d. The proposal uses to the maximum extent possible the best available construction, design, and development techniques which result in the least adverse impact on the critical area , adhering to the mitigation sequencing requirements of this chapter, and where feasible, the restoration and rehabilitation of the impacted critical area; and e. The proposal is consistent with the purpose and intent of this chapter and incorporates all other development standards of this chapter stated herein. 3. Stormwater management facilities. A wetland or its buffer can be physically or hydrologically altered to meet the requirements of a Low Impact Development (LID) methodology or Flow Control BMP if all the following criteria are met: a. The wetland is classified as a Category IV or a Category III wetland with a habitat score of 3-5 points; b. There will be no net loss of functions and values of the wetland; c. The wetland does not contain a breeding population of any native amphibian species; d. The hydrologic functions of the wetland can be improved as outlined in questions 3, 4, and 5 of Chart 4 and questions 2, 3, and 4 of Chart 5 in Selecting Mitigation Sites Using a Watershed Approach, Western Washington (Ecology Publication #09-06-032, or as revised); or the wetland is part of a restoration plan intended to achieve restoration goals identified in a shoreline master program or a local or regional watershed plan; e. The wetland lies in the natural routing of the runoff, and the discharge follows the natural routing; f. All regulations regarding stormwater and wetland management are followed, including but not limited to local and state wetland and stormwater codes, manuals, and permits; and g. Modifications that alter the structure of a wetland or its soils will require permits. Existing functions and values that are lost will need to be compensated. 4. Utility location by a public agency or utility district. Every attempt must be made to avoid locating utilities within critical areas and their buffer. The Director may approve the siting of new public utilities in critical areas pursuant to the following criteria: a. There is no other practical alternative to the proposed development with less impact on the critical areas. b. The application of the critical area regulations would unreasonably restrict the ability to provide utility services to the public. c. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site. November 4, 2026 G - 27 Attachment 2 MCA 26-0090 17 d. The proposal attempts to protect and mitigate to the critical area functions and values consistent with the best available science. e. The proposal is consistent with other applicable regulations and standards. f. Stream crossings, whether for access or utility purposes, must be avoided to the extent possible; but when necessary due to the lack of feasible alternatives, crossing of streams must follow all applicable local, state, and federal laws and the following criteria: i. Bridges are required for streams which support salmonids, unless otherwise allowed by the Washington State Department of Fish and Wildlife; ii. All crossings using culverts must use super-span or oversize culverts; iii. Any work within the stream channel must be constructed and installed per the requirements of an applicable State hydraulics permit; iv. No work within the stream channel may occur in salmonid spawning areas or outside the work window established in the hydraulic project approval (HPA) from the Department of Fish and Wildlife, together with any added timing restrictions from consultation under PAMC 15.22.025; v. Bridge piers or abutments must not be placed in either the floodway or between the ordinary high water marks unless no other feasible alternative placement exists; vi. Crossings must not diminish flood-carrying capacity and must be designed to pass the 100- year flood and the increase in peak flow projected over the crossing’s design life, using WDFW guidance; vii. Crossings must provide for routine maintenance of culverts, bridges and utilities; and viii. Crossings must serve multiple properties whenever possible. 15.22.100 Reasonable use exceptions. Exceptions to the development restrictions and standards set forth in this chapter may be permitted by application to the Director of Community and Economic Development, limited to the requirements established in subsection A below. Reasonable use exceptions must be processed as a Type III permit pursuant to the provisions of this section and Chapter 18.02 PAMC, with a final decision made by the Hearing Examiner after reviewing the recommendation of the Director. The Director’s recommendation must be in writing with findings on each criterion, after third-party review and consultation under PAMC 15.22.025. A. Reasonable use development exceptions. An applicant may propose a reasonable use development exception only if all economic use of a property would otherwise be denied, pursuant to the following criteria: 1. The proposal is limited to the minimum necessary to fulfill reasonable use of the property, and there is no other reasonable economic alternative that has less impact on the critical area; 2. The proposal is compatible in design, scale, and use with other development or potential development in the immediate vicinity of the subject property in the same zone and with similar site constraints; 3. The proposal utilizes to the maximum extent possible the best available construction, design, and development techniques which result in the least adverse impact on the critical area or areas based on the best available science; 4. The proposal is consistent with the purpose and intent of this chapter and will result in no net loss of ecological functions and values of the critical area consistent with the best available science; 5. When the functions and values of the critical area or its buffer will be disrupted, the applicant has prepared a mitigation plan per the requirements in PAMC 15.22.13 0 to offset losses; November 4, 2026 G - 28 Attachment 2 MCA 26-0090 18 6. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site; 7. The inability of the applicant to derive reasonable economic use of the property is not the result of actions by the applicant after the effective date of this regulation, or its predecessor; 8. Alternatives that avoid or reduce impacts (i.e. smaller footprint, relocation, shared access, clustering) have been evaluated) and the record shows why each was rejected ; 9. A reasonable use exception does not authorize take of a species listed under the federal En dangered Species Act, impairment of a treaty right, or any activity prohibited by other law; and 10. The proposal is consistent with other applicable regulations and standards. B. Critical area variance. The city may approve or approve with modifications of conditions an application for a critical area variance from building or structure setbacks and other dimensional standards if all the following criteria are satisfied: 1. Special circumstances exist that are particular to the land, the lot, or something inherent in the land, and that are not applicable to other lands subject to the provisions of this chapter; 2. The proposed development does not pose a threat to adjacent property or to public health and safety; 3. Any proposed modification to a critical area will be evaluated through consideration of a critical area report and mitigation plan prepared by a qualified professional pursuant to the requirements of this chapter, and will be the minimum necessary to allow reasonable and economically viable use of the property. The report and mitigation plan must be prepared using best available science; 4. Mitigation sequencing per PAMC 15.22.130 has been applied, and the proposal mitigates impacts to the critical area or buffer on site to the maximum extent possible, while still allowing reasonable use of the lot. Off-site mitigation may only be utilized when deemed necessary to achieve no net loss of ecological functions and values; 5. The variance will not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and land use district in which the subject property is located; and 6. The granting of the variance is consistent with the general purpose and intent of the City of Port Angeles Comprehensive Plan, Climate Resiliency Plan, and other applicable planning policies. ARTICLE II. CRITICAL AREAS REVIEW PROCEDURES 15.22.110 Critical area report. A. Report required. All land uses and developments proposed in an area listed, identified, inventoried, classified, or rated, or likely to affect, one or more critical areas or within the required buffer, must include supporting reports or studies, prepared by a qualified professional, to describe the environmental limitations of the site. No construction activity, including clearing or grading, will be permitted until the information required by this chapter is reviewed and approved by the City as adequate. B. Critical area report sections. A critical area report must contain one or more of the following sections or report types unless exempted by the Director based on the extent of the potential impacts to the critical area or its associated buffer. The typical sequence of required sections or reports that will fulfill the requirements of this section include: 1. Reconnaissance. The existence, general location, and type of critical areas on, adjacent to, or likely to be impacted by activities on a project site. Determination of whether the project will impact or be at risk from the potential critical areas based on maximum potential buffers for the critical area type. Possible application of exemptions should also be addressed at this stage. If during site reconnaissance November 4, 2026 G - 29 Attachment 2 MCA 26-0090 19 it is determined that the proposed development is unlikely to impact a critical area or its buffer, additional reporting may not be required; 2. Delineations. The extent, field verified boundaries, rating or classification, and applicable standard buffers of critical areas where the project area could impact the critical area or its buffer. An assessment of the characteristics of, or functions and values of the critical area and buffers must be identified; 3. Analysis. The proposal and impact assessment report documenting the potential project impacts to the critical area and buffers including a discussion of the efforts taken to avoid, minimize, and reduce potential impacts to those areas. 4. Mitigation. The measures that prevent or compensate for the potential impacts of the project designed to meet the requirements of this chapter, mitigation plan requirements defined in PAMC 15.22.13, and the standards for the specific critical area(s) impacted. Mitigation plans include, but are not limited to, habitat management plans, revegetation or replanting plans, and restoration plans; 5. Maintenance and monitoring. The goals of the mitigation proposed, performance standards for success, monitoring methods and reporting schedule, and contingency actions. Maintenance and monitoring plans must be consistent with the mitigation performance standards and requirements of this chapter, including the specific mitigation plan requirements outlined in each critical area type section. 15.22.120 Minimum report requirements. The critical area report must use scientifically valid methods and studies in the analysis of critical area data and field reconnaissance and reference the source of science used. The critical area report must evaluate the proposal and all probable impacts to critical areas and/or buffers in accordance with the provisions of this chapter. At a minimum, critical area reports must contain the following: A. The name and contact information of the applicant, a description of the proposal, and identification of the permit requested; B. A copy of the site plan for the development proposal showing: 1. The field verified location of the critical area, applicable buffer, and the development proposal with dimensions and setbacks; 2. Limits of any areas to be cleared for the proposed development, any vegetation to remain, and a description of the proposed stormwater management plan for the development and consideration of impacts to drainage alterations. C. The dates, names, and qualifications of the persons preparing the report and documentation of any site investigations performed on the site; D. Identification and characterization of all critical areas and buffers adjacent to the proposed project area; E. A statement specifying the accuracy of the report, and all assumptions made and relied upon; F. An assessment of the probably cumulative impacts to critical areas resulting from the proposed development, including a landscape-scale assessment of the affected critical area; G. An analysis of site development alternatives, if applicable; H. A description of reasonable efforts made to apply mitigation sequencing pursuant to section 15.22.130 PAMC to avoid, minimize, and mitigate impacts to critical areas and buffers; I. Mitigation plans, as needed, to ensure no net loss of functions and values, in accordance with the mitigation plan requirements in section 15.22.140 PAMC. Where feasible, applicants are encouraged to strive for enhancement of functions and values of the impacted critical area; November 4, 2026 G - 30 Attachment 2 MCA 26-0090 20 J. A discussion of the performance standards applicable to the critical area and proposed activity; K. Financial guarantees to ensure compliance; and L. Any additional information required for the critical area as specified in the corresponding Article. 15.22.130 Mitigation sequencing. This section applies to mitigation required for all critical area reviews, approvals, and enforcement pursuant to this chapter. This section is supplemented with specific measures under sections for particular critical area types. Mitigation for specific development proposals may include a combination of the measures below and must be designed and constructed in accordance with the provisions of this section. An applicant must demonstrate that the following actions have been taken to achieve no net loss of functions and values, or where feasible, enhancement of functions and values, in the following sequential order: A. Avoiding the impact altogether by not taking a certain action or parts of actions; B. Minimizing impacts by limiting the degree of magnitude of the action and its implementation by using appropriate technology, or by taking affirmative steps, such as project redesign, relocation, or timing to avoid or reduce impacts; C. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment; D. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; E. Compensating for the impact by replacing, enhancing, or providing substitute resources or environments; and/or F. Monitoring the impact and taking appropriate corrective measures. 15.22.140 Mitigation plan requirements. When the functions and values of a critical area or its buffer will be impacted, a mitigation plan must be prepared by a qualified professional utilizing mitigation sequencing as described in section 15.22.130 PAMC. Mitigation must be sufficient to restore impacted functions and values or compensate for the impacted functions and values. At a minimum, the mitigation plan must consist of the following: A. Baseline information. Quantitative data must be collected and analyzed for both the impacted critical area and the proposed mitigation site, if different from the impacted area. B. Environmental goals and objectives. Goals and objectives describing the purposes of the mitigation measures must be provided, including a description of the site selection criteria, identification of target evaluation species, and resource functions. The goals and objectives must be related to the functions and values of the impacted critical area and consistent with the best available science. Where feasible, applicants are encouraged to strive for net ecological gain of the impacted critical area . C. Performance standards. Specific criteria for fulfilling the environmental goals and objectives, and for beginning remedial action or contingency measures must be provided, including water quality standards, species richness and diversity targets, habitat diversity indices, or other ecological, geological, or hydrological criteria. D. Detailed construction plan. Written specifications and descriptions of mitigation techniques must be provided, including the proposed construction sequence, accompanied by detailed site diagrams and blueprints that are an integral requirement of any development proposal. E. Monitoring program. A program outlining the approach for assessing a completed project must be provided, including descriptions or proposed experimental and control site survey or sampling techniques. A monitoring protocol must be included outlining how the data will be evaluated by agencies that are tracking the progress of the mitigation project. Updates must be submitted at least twice-yearly documenting November 4, 2026 G - 31 Attachment 2 MCA 26-0090 21 milestones, successes, issues, and contingency actions of the restoration or compensation project, for a minimum of five years as required by the Director. F. Contingency plan. A plan must be provided fully identifying potential courses of action and any corrective measures to be taken when monitoring or evaluation indicates project performance standards are not being met. G. Performance and maintenance securities. Securities ensuring fulfillment of the mitigation project, monitoring program, and any contingency measures must be posted pursuant to section 15.22.180 PAMC. 15.22.150 Critical area tracts. As a condition of any permit issued pursuant to this chapter, the permit holder may be required to create a separate critical area tract or tracts containing the areas determined to be a critical area in field investigations performed pursuant to this chapter. Critical area tracts are legally created tracts containing critical areas and their buffers that must remain undisturbed in perpetuity. Critical area tracts are an integral part of the lot in which they are created, are not intended for sale, lease or transfer, and must be included in the area of the parent lot for purposes of subdivision methods and zoning regulations. A. Legal protection of critical area tracts. When the Director of Community and Economic Development requires the creation of a critical area tract as a condition of any permit issued pursuant to this chapter, the critical area tract or tracts must be protected by one of the following methods to be determined by the Director of Community and Economic Development: 1. Easement. The permit holder must convey an irrevocable offer to dedicate to the City of Port Angeles, or other public or non-profit entity specified by the Director of Community and Economic Development, an easement for the protection of the critical area; or 2. Deed restriction. The permit holder must establish and record a permanent and irrevocable deed restriction on the property title of all lots containing a critical area tract or tracts created as a condition of any permit. Such deed restriction(s) must prohibit in perpetuity the development, alteration, or disturbance of vegetation within the critical area tract, except for purposes of habitat enhancement as part of an enhancement project which has received prior written approval from the City of Port Angeles and any other agency with jurisdiction over such activity. The deed restriction must also contain the following language: "Before beginning, and during the course of any grading, building construction, or other development activity on a lot or development site subject to this deed restriction, the common boundary between the area subject to the deed restriction and the area of development activity must be fenced or otherwise marked to the satisfaction of the City of Port Angeles". Additional note. The following note must appear on the face of all plats, short plats, PRDs, or other approved site plans containing separate critical area tracts and must be recorded on the title of record for all affected lots: "NOTE: All owners of lots adjoining separate critical area tracts identified as critical area easements or protected by deed restriction are responsible for maintenance and protection of the tracts. Maintenance includes ensuring that no alterations occur within the separate tract and that all vegetation remains undisturbed for other than natural reasons, unless the express written authorization of the City of Port Angeles has been received." B. Identification of critical area tracts. The common boundary between a separate critical area tract and the adjacent land must be permanently identified. 1. Signs. Identification must include permanent signs available from the Planning Division. Sign locations, wording, and size specifications must be approved by the Director of Community and Economic Development. 2. Fencing. The Director of Community and Economic Development may require permanent fencing for the purpose of delineating the critical area tract or tracts, only where the fence will not unnecessarily November 4, 2026 G - 32 Attachment 2 MCA 26-0090 22 impede the natural movement of wildlife. Any permanent fencing must be wildlife-permeable and designed using WDFW guidance. Where not feasible, signs and dense native vegetation must be used. C. Maintenance of critical area tracts. Responsibility for maintaining critical area tracts must be held by either the property owner, a homeowners' association, adjacent lot owners, the permit applicant or designee, or other appropriate entity as approved by the Director of Community and Economic Development. 15.22.160 Field identification and markings. A. Temporary field marking during construction. The outer perimeter of the critical area buffer and the clearing limits identified by an approved permit or authorization must be marked in the field with temporary “clearing limits” fencing in such a way as to ensure that no unauthorized intrusion will o ccur. This temporary marking and fencing must be maintained throughout development and may not be removed until permanent fencing and/or signs, if required, are installed. B. Permanent field marking. The decision maker may require installation of permanent signs, markers, and fencing along the outer perimeter of a critical area or its buffer when it is determined necessary to protect the critical area’s functions and values. Permanent fencing must be installed prior to final project approval or occupancy, as determined by the decision maker, consistent with the criteria in 15.22.150 PAMC. C. Maintenance and replacement. It is the responsibility of the landowner, successors, or as otherwise assigned to maintain in perpetuity and replace, if necessary, all permanent fencing and field markings. 15.22.170 Development plan review, monitoring, and inspections. A. The Director may require third party project building and development plans be reviewed by a qualified professional for confirmation of consistency with the critical area report and recommendations prior to approval of construction plans. B. The Director may require monitoring by a qualified professional during development activities within, or adjacent to, critical areas or buffers and/or a final inspection report by the qualified professional stating that development has or has not implemented the conditions design specifications provided in the project’s critical area report, and evaluation of any deviation from the recommendations. C. When the Director determines that such services are necessary to demonstrate compliance with the provisions of this chapter, they will be at the applicant’s expense. 15.22.180 Financial guarantee requirements. A. Performance securities. The Director of Community and Economic Development may require the applicant of a development proposal to post a cash performance bond or other acceptable security to guarantee that the applicant will properly construct all structures and improvements as required by this chapter. The security must guarantee that the work and materials used in construction are free from defects. All securities must be on a form approved by the Director of Community and Economic Development. Until written release of the security, the security may not be terminated or canceled. The Director of Community and Economic Development must release the security upon determining that all structures and improvements have been satisfactorily constructed and upon the posting by the applicant of a maintenance security if one is required. B. Maintenance securities. The Director of Community and Economic Development may require the applicant to post a cash maintenance bond or other acceptable security guaranteeing that structures and improvements required by this chapter satisfactorily perform for a minimum of two years. This requirement must also apply in the case of required mitigation improvements. All securities must be on a form approved by the Director. Until written release of the security, the principal or surety may not be terminated or canceled. The Director must release the security upon determining that performance standards established for evaluating the effectiveness and success of the structures and improvements have been satisfactorily met. The performance standards must be approved by the Director and contained in the mitigation plan developed and approved during the review process. November 4, 2026 G - 33 Attachment 2 MCA 26-0090 23 C. Renewable bonds. Any bonds required by this section may be in the form of one -year bonds to be renewed as appropriate. 15.22.190 Unauthorized critical area modifications. A. Violations. When a critical area of its buffer has been altered in violation of this Chapter, all ongoing development work must stop, and the critical area must be restored in accordance with the provisions of this chapter. Each day a violation of this chapter occurs or continues constitutes a separate offense and is subject to enforcement and penalties under PAMC 2.90 at the owner’s or other responsible party’s expense to compensate for violation of provisions of this chapter. B. Requirement for restoration plan. All unauthorized development work must remain stopped until a restoration plan is prepared and approved by the Director of Community and Economic Development. Such a plan must be prepared by a qualified professional for the applicable critical area using currently accepted scientific principles and must describe how the actions proposed meet the minimum requirements of a mitigation plan as described in section 15.22.140. The Director may, at the owner’s or other responsible party’s expense, seek expert advice in determining the adequacy of the plan. Inadequate plans will be returned to the applicant or other responsible party for revision and re-submittal. 15.22.200 Final decision and appeals. A. Final decisions. All project permit determinations made pursuant to this chapter must be final concurrent with the final decision to approve, condition, or deny the underlying permit for the development proposal or other activity involved unless appealed pursuant to PAMC 18.02.220 and 18.02.230. B. Appeals. A person aggrieved by the denial or conditioning of a critical areas permit may appeal the decision to the City’s Hearing Examiner pursuant to Article V of PAMC 18.02. To initiate an appeal, the appellant must file a notice of appeal with the applicable Director, as defined in PAMC 18.02.020, and pay the appeal fee established in the City’s Master Fee Schedule (PAMC Appendix A). CHAPTER 15.24 Wetlands Protection (MOVED TO CHAPTER 15.22) This chapter is hereby deleted in its entirety and moved to a new chapter 15.22 for replacement. ARTICLE III. Wetlands 15.22.210 Purpose A. The purpose of this article is to recognize and protect the many beneficial ecological functions and social services wetlands provide through regulated site planning to avoid or minimize impacts to wetlands wherever possible, to require that activities not dependent upon a wetland l ocation be located in upland sites, and to achieve no net loss of the ecological functions and values wetlands provide through compensatory mitigation to offset losses which are unavoidable. B. This article is intended to be consistent with the requirements of Chapter 36 .70A RCW and to implement the goals and policies of the City’s Comprehensive Plan, Climate Resiliency Plan, and Strategic Plan for protecting wetlands. 15.22.220 Identification, delineation, and rating. A. Identification. All areas that meet the criteria in the definition of a wetland consistent with RCW 36.70A.030 will be identified as critical areas and are subject to the provisions of this chapter. Wetlands are dynamic November 4, 2026 G - 34 Attachment 2 MCA 26-0090 24 systems that can change over time; as such, delineations must be performed to adequately identify wetlands and their buffers. B. Delineation. The exact location of a wetland’s boundary must be determined through the performance of a field investigation by a qualified wetland professional using the latest version of the approved federal wetland delineation manual and regional supplements. Evidence documenting the results of the boundary survey, including evidence of a lack of wetland indicators if no wetlands are identified, must be submitted to the City with any development application. 1. The delineation should result in a wetland boundary clearly marked in the field and an accurate ground-verified map of the boundaries. The map should be created using either a professional survey or using an equivalent method such as GPS with sub-meter accuracy. The map should also include an indication of where wetlands exist off-site, when feasible. 2. Wetland delineations are valid for five (5) years; after such date, the City will determine if a revision or additional assessment is necessary. C. Rating. Wetlands must be rated according to the Washington Department of Ecology wetland rating system, as set forth in the Washington State Wetland Rating System for Western Washington: 2014 Update (Version 2), and as revised. The wetland categories determined by the rating are as follows: 1. Category I. Category I wetlands are: a. Relatively undisturbed estuarine wetlands larger than one acre; b. Wetlands of high conservation value that have been identified by scientists from the Washington Natural Heritage Program due to the presence of rare species or a rare or high -quality ecosystem type; c. Bogs; d. Wetlands with mature and old-growth forests over one acre in size; e. Wetlands in coastal lagoons; and f. Wetlands that perform many functions well, scoring a 23 or higher on the questions related to functions in the wetland rating form. These wetlands are those that represent a unique wetland type, are more sensitive to disturbance than most wetlands, or are relatively undisturbed and contain ecological attributes that are impossible to replace within on human lifetime. 2. Category II. Category II wetlands include: a. Estuarine wetlands smaller than one acre in size, or disturbed estuarine wetlands larger than one acre; b. Wetlands that score between 20 – 22 points on the questions related to functions on the wetland rating form. 3. Category III. Category III wetlands are: a. Wetlands with a moderate level of functions, scoring between 16-19 points on the wetland rating form; and b. Can often be adequately replaced with a well-planned mitigation project. 4. Category IV. Category IV wetlands are often heavily disturbed and have the lowest levels of functions, scoring less than 16 in the wetland rating. D. Illegal modifications. When a violation occurs, wetland rating categories do not change due to illegal modifications or alterations. A wetland’s category must be based on the pre -violation condition of the wetland. November 4, 2026 G - 35 Attachment 2 MCA 26-0090 25 15.22.230 Regulated and allowed activities. A. Regulated activities. All development activities and uses are prohibited in wetlands and wetland buffers, unless administered through the permit procedures established in this chapter, and only when it is demonstrated that the activity or use will not result in a net loss of ecological functions and values of the wetland through the application of mitigation sequencing as demonstrated in a critical area report. The following activities are regulated unless otherwise exempted by PAMC 15.22.070 if they occur in a wetland or its buffer: 1. The removal, excavation, grading, or dredging of soil, sand, gravel, minerals, organic matter, or material of any kind; 2. The dumping of, discharging of, or filling with any material; 3. The draining, flooding, or disturbing of the water level or water table; 4. Pile driving; 5. The placing of obstructions; 6. The construction, reconstruction, demolition, or expansion of any structure; 7. The destruction or alteration of wetland vegetation through clearing, harvesting, shading, intentional burning, or planting of vegetation that would alter the character of a regulated wetland, provided that these activities are not part of a forest practice governed under Chapter 76.09 RCW and its rules; 8. Activities that result in a significant change of water temperature, a significant change of physical or chemical characteristics of wetland water sources, including quantity, or the introduction of pollutants; 9. Land divisions and land use permits that contain regulated wetlands or their buffers or, that may impact a regulated wetland or its buffer, must comply with the following procedures and development standards: a. Land that is located wholly within a wetland and/or its buffer may not be subdivided; b. Land that is located partially within a wetland or its buffer may be subdivided; provided, that an accessible and contiguous portion of each new lot: i. Is located outside of the wetland and its buffer, and ii. Meets the minimum lot size requirements of the underlying zone as defined in Title 17. c. Land division approvals must be conditioned to require that regulated wetlands and wetland buffers be dedicated as open space tracts, or as an easement or covenant encumbering the wetland and wetland buffer. Such dedication, easement or covenant must be r ecorded together with the land division and represented on the final plat and title; c. The use of clustered development or similar innovative site planning is strongly encouraged for projects with regulated wetlands and buffers on the project site to accommodate innovation, creativity, and design flexibility; d. After preliminary approval and prior to the final land division or other land use permit approval, the department may require that the common boundary between a regulated wetland and associated buffer and the adjacent land be identified using permanent signs and/or fencing consistent with PAMC 15.22.150 and 15.22.160. 10. Stormwater management facilities may not be located within wetland buffers, with the following exceptions: a. Conveyance systems may be located in wetland buffers on a case-by-case basis if deemed necessary and approved by the Director of Public Works and Utilities. November 4, 2026 G - 36 Attachment 2 MCA 26-0090 26 b. Full dispersion of flow, as described in BMP T5.30 of the Department of Ecology's most current SWMMWW, may be allowed in a wetland buffer if approved by the Director of Public Works and Utilities. c. The facilities or methods specified in subsections 10.a and b of this section are allowed only if impacts to the buffer, resulting from their installation, are avoided or mitigated. 11. Stormwater management design and facilities must be consistent with PAMC Section 13.63.190, to protect wetland hydrology and wetland functions. Native vegetation enhancement in wetland buffers may be approved for both buffer enhancement and as part of a b est management practice to meet low impact development stormwater standards required by the Washington State Department of Ecology. Any stormwater management facility or method associated with wetlands must meet the state requirements adopted in PAMC Section 13.63.190. B. Allowed activities. In addition to those uses or activities allowed under PAMC section 15.22.080, the following uses or activities may be allowed within a wetland or wetland buffer to the extent they are not prohibited by any other ordinance or law and provided they are condu cted using best available science, except where such activities result in the conversion of a regulated wetland or buffer to a use which it was not previously subjected: 1. Conservation or preservation of soil, water, vegetation, fish, shellfish, and other wildlife that does not include changing the structure or functions of the existing wetland or buffer; 2. The harvesting of wild crops in a manner that is not detrimental to the natural reproduction of such crops and provided the harvesting does not require tilling of soil, planting of crops, or alteration of the wetland or buffer by changing existing topography, water condition or quality, or water sources; 3. Existing and ongoing agricultural activities that minimize adverse impacts to wetlands, water quality, riparian ecology, salmonid populations, and wildlife habitat. New agricultural activities or existing activities that remove trees, divert or impound water, involve excavation, ditching, draining, culverting, filling, grading, or similar activities that introduce adverse impacts to wetlands are not allowed. a. For all existing and ongoing agricultural activities, the use of best management practices as established by the Natural Resource Conservation Service (NRCS), farm conservation plans, and incentive-based programs to improve agricultural practices in and n ear wetlands must be used to the extent feasible. 4. The maintenance, but not creation, of existing drainage ditches; 5. Navigation aids and boundary markers; and 6. Boat mooring buoys. C. Special permit uses. Any activity or use other than those specified in this chapter may not be conducted in wetlands or wetland buffers except upon issuance of a critical area development permit by the Director of Community and Economic Development. 15.22.240 Wetland buffers. A. Standard buffer zone widths. Wetland buffer zones are required for all regulated activities adjacent to or likely to impact a regulated wetland to protect the integrity, functions and values of the wetland. The buffer standards required by this chapter presume the existence of a dense vegetation community in the buffer adequate to protect the wetland functions and values. When a buffer lacks adequate vegetation, the Director may increase the standard buffer, require buffer planting or other enhancements, and/or deny a proposal for buffer reduction or buffer averaging. Buffers may not include areas that are functionally and effectively disconnected from the wetland by an existing public or private road. Functionally and effectively disconnected means that the road stops the protective measures provided by a buffer or it disrupts the life cycle of wildlife documented to be using the area. November 4, 2026 G - 37 Attachment 2 MCA 26-0090 27 The standard buffer widths established below are adopted from the Department of Ecology Wetland Guidance for Critical Areas Ordinance (CAO) Updates for Western Washington (publication #22-06-014 or as amended) and are based on the wetland category, the intensity of the proposed adjacent land use, and the functions or special characteristics of the wetland that need to be protected as determined through the rating system. If a wetland meets more than one of the characteristics listed, the buffer width will be that of the widest one: 1. Category I Wetlands. For wetlands rated as a Category I wetland with a score for all three basic functions greater than or equal to 23 points, or having the “special characteristics” identified in the rating system, the following buffer widths apply: Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Wetlands of high conservation value or Bogs 250 190 125 Estuarine or Coastal Lagoons 200 150 100 Forested Buffer width to be based on score for habitat functions or water quality functions (below). Score of 8-9 for habitat function 300 225 150 Score of 6-7 for habitat function 150 110 75 Score of 8-9 for water quality improvement and less than 6 for habitat 100 75 50 Not meeting any of the above, but still rated as a Category I 100 75 50 2. Category II Wetlands. For wetlands rated as a Category II wetland with a score for all three basic functions of 20 – 22 points or having the “special characteristics” identified in the rating system, the following buffer widths apply: Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Score of 8-9 for habitat function 300 225 150 Score of 6-7 for habitat function 150 110 75 Score of 8-9 for water quality improvement and less than 6 for habitat 100 75 50 Estuarine 150 110 75 Not meeting any of the above, but still rated as a Category II 100 75 50 November 4, 2026 G - 38 Attachment 2 MCA 26-0090 28 3. Category III Wetlands. For wetlands rated as a Category III wetland with a score for all three basic functions of 16 – 19 points, the following buffers widths apply: Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Score of 6-7 for habitat function 150 110 75 Score of 3-5 for habitat function 80 60 40 4. Category IV Wetlands. For wetland rated as a Category IV wetland scoring less than 16 points for all functions, the following buffer widths apply: Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Score for all three basic functions less than 16 points 50 40 25 B. Land use intensity. For buffer width determinations as shown above, the land use intensity rating is as follows: High Land Use Intensity Land uses including the following: commercial, industrial, institutional, conversion to high-intensity agriculture, high-intensity recreation such as golf courses or ball fields, and residential development with greater than 75% maximum site coverage. Moderate Land Use Intensity Land uses including the following: residential development with less than 75% maximum site coverage, moderate-intensity open space such as parks with paved trails, conversion to moderate-intensity agriculture, hobby farms, construction of logging roads associated with regulated forestry activities, and utility corridors or easements including access/maintenance roads. Low Land Use Intensity Land uses including the following: low-intensity open space activities, trails made of a pervious surface, utility corridors or easements with little or no vegetation management. C. Increased buffer widths. The Director may require increased standard buffer widths on a case-by-case basis when a larger buffer is necessary to protect the functions and values of the wetland, based on local conditions. This determination must be supported by appropriate documenta tion showing that it is reasonably related to the protection of the functions and values of the regulated wetland. Such determination will be attached as a permit condition and must demonstrate that: 1. A larger buffer is necessary to maintain viable populations of existing species; or 2. The wetland is used by species proposed or listed by the Federal Government or the State as endangered, threatened, rare, monitor, or sensitive, critical or outstanding potential habitat for those species, or has unusual nesting or resting sites, such as heron rookeries or raptor nesting trees; or 3. The adjacent land is susceptible to severe erosion, and erosion control measures will not effectively prevent adverse wetland impacts; or 4. The adjacent land has minimal vegetative cover or slopes greater than 15 percent. November 4, 2026 G - 39 Attachment 2 MCA 26-0090 29 D. Standard buffer width averaging. Standard buffer widths may be modified by averaging buffer widths to improve wetland protection or to allow for reasonable use of a parcel. Buffer averaging may not be combined with other buffer reductions. Averaging under this subsection may not be approved where the reduced buffer would harm habitat of listed or sensitive species or treaty-protected resources. 1. Averaging to improve wetland protection may be permitted when all the following conditions are met: a. The wetland has significant differences in characteristics that affect its habitat functions, such as a wetland with a forested component adjacent to a degraded emergent component or a dual - rated wetland with a Category I area adjacent to a lower rated area; b. The buffer is increased adjacent to the higher-functions area of habitat or more sensitive portion of the wetland and decreased adjacent to the lower-functioning or less sensitive portion; c. The total area of the buffer after averaging is equal to the area required without averaging; and d. The buffer, at its narrowest point, is never less than 75 percent of the required width. 2. Averaging to allow reasonable use of a parcel may be permitted when all the following criteria are met; a. There are no feasible alternatives to the site design that could be accomplished without buffer averaging; b. The averaged buffer will not result in degradation of the wetland’s functions and values as demonstrated by a report from a qualified wetland professional; c. Measures to be taken to ensure no loss of wetland or buffer function due to the buffer averaging are described in the report prepared by the qualified professional; d. The total buffer area after averaging is equal to the area required without averaging; and e. The width of the buffer at any given point after averaging should be no narrower than 75 percent of the standard buffer, or, 75 feet for Category I and II, 50 feet for Category III, and 25 feet for Category IV, whichever is greater. E. Reduction of standard buffer widths. No buffer may be reduced unless buffer averaging is infeasible. Buffer reductions may not be combined with averaging. The Director may reduce the standard wetland buffer width for proposed land uses with high-intensity impacts to those recommended for moderate -intensity impacts on a case-by-case basis where it can be demonstrated that: 1. For wetlands that score moderate or high for habitat (6 points or more for the habitat functions), the width of the buffer can be reduced if both of the following criteria are met: a. A relatively undisturbed, vegetated corridor of at least 100-feet wide is protected between the wetland and any other Priority Habitats as defined by the Washington Department of Fish and Wildlife. The corridor must be protected for the entire distance between the wetland and the Priority Habitat by some type of legal protection such as a conservation easement. b. Measures to minimize the impacts of different land uses on wetlands, such as the examples provided in table 15.22.240-1 below, are applied. These mitigation measures will be applied as conditions of the wetland permit. 2. For wetlands that score less than 6 points for habitat, the buffer width can be reduced to that required for moderate land-use impacts if measures to minimize the impacts of the proposed land use are applied as provided in table 15.22.240-1. 3. All wetland buffer reduction requests must be accompanied by a report prepared by a qualified professional that meets the criteria of this subsection and may be subject to third party review and consultation under PAMC 15.22.025. Table 15.22.240-1 Measures to Minimize Impacts on Wetlands November 4, 2026 G - 40 Attachment 2 MCA 26-0090 30 Examples of Disturbance Activities and Uses that Cause Disturbances Measures to Minimize Impacts Lights • Parking lots • Warehouses • Commercial • Industrial • Residential • Recreation (i.e. athletic fields) • Direct lights away from wetlands • Use of shielded light fixtures • Use motion-activated lights • Only use lighting where necessary and keep lights off when not needed • Use of lower-intensity LED lighting Noise • Commercial • Industrial • Recreation (i.e. athletic fields) • Residential • Locate noise-generating activities away from wetlands • Construct a fence to reduce noise impact on adjacent wetland and buffer • Plant a strip of dense tree and shrub vegetation adjacent to wetland buffer, consisting primarily of evergreen species Toxic runoff • Parking lots • Roads • Commercial • Industrial • Residential areas • Large-scale use of pesticides • Landscaping and excessive fertilizer use • Route all new, untreated runoff away from wetland while ensuring the wetland is not dewatered • Apply integrated pest management and best practices Stormwater runoff • Parking lots • Roads • Commercial • Industrial • Residential areas • Landscaping • Other impermeable surfaces, compacted soil, etc. • Retrofit stormwater detention and treatment for roads and existing adjacent development • Prevent channelized or sheet flow from lawns that directly enter the buffer • Infiltrate or treat, detain, and disperse new runoff from impervious surfaces and lawns Pets and human disturbance • Residential areas • Parks and recreation • Use privacy fencing • Plant dense vegetation appropriate for the ecoregion to delineate buffer edge and discourage disturbance • Place wetland and its buffer in a separate tract • Place signs around the wetland buffer and in subdivisions, place November 4, 2026 G - 41 Attachment 2 MCA 26-0090 31 one at the back of each residential lot • When platting new subdivisions, locate greenbelts, stormwater facilities, and other lower intensity uses adjacent to wetland buffers F. Measurement of buffer widths. All buffers must be measured perpendicularly from the wetland boundary as surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for approved wetland alterations must be the same as the buffer required for the category of the created, restored, or enhanced wetland. G. Buffers on mitigation sites. All wetland mitigation sites must have buffers consistent with the buffer requirements of this chapter. Buffers must be based on the expected or target category of the proposed wetland mitigation site once the mitigation actions are taken. H. Building setbacks from buffers. Buildings, structures, paving, and other impervious surfaces must be set back 15 feet from the edge of any wetland buffer. The setback must be identified on a site plan that is submitted with the development application. Minor intrusions into the area of t he building setback may be allowed if the Director of Community and Economic Development determines that such intrusions will not negatively impact the wetland’s functions and values, or the critical root zone of trees within the buffer. The following minor intrusions into the buffer may be allowed: 1. Landscaping, provided no non-native invasive species or copper-containing or chemically treated bark or mulch are used in the landscaping; 2. Uncovered decks, roof eaves and overhangs, unroofed stairways and steps; 3. Pervious ground surfaces, such as driveways, patios, and parking may be allowed; provided, that they are engineered as a permeable pavement system. Such improvements may be subject to the requirements in PAMC Chapter 13.63, Stormwater – Utility and Regulations. I. Buffer maintenance. Except where otherwise specified or allowed in this accordance with this chapter, final buffer conditions must be retained in an undisturbed or enhanced condition. In the case of compensatory mitigation sites, removal of nonnative weeds may be required for the duration of the mitigation bond. J. Buffer impacts. Wetland impacts must be avoided and minimized to the greatest extent practicable. Unavoidable impacts to wetlands must be offset by compensatory mitigation to achieve no net loss of wetland functions and values. Mitigation must occur on the same site when feasible or within the same wetland system, when possible. K. Allowed buffer uses. The following uses may be allowed within a wetland buffer in accordance with the review procedures of this chapter, provided they are not prohibited by any other applicable law, and they are conducted in a manner so as to minimize the impacts to the buffer and adjacent wetland: 1. Conservation or restoration activities aimed at protecting the soil, water, vegetation, or wildlife; 2. Passive recreation facilities designed in accordance with an approved critical area report, including: a. Walkways and trails, provided that they are limited to minor crossings having no adverse impact on water quality. They should be generally parallel to the perimeter of the wetland, located only in the outer 25% of the wetland buffer area, and located to avoid removal of significant, mature, or old-growth trees. The trail surface must be limited to five (5) feet in width and designed using permeable materials for pedestrian use only. b. Wildlife viewing structures that are designed to minimize impacts to the buffer. November 4, 2026 G - 42 Attachment 2 MCA 26-0090 32 3. Educational and scientific research activities; 4. Normal and routine maintenance and repair of any existing public or private facilities within an existing right-of-way, provided that the maintenance or repair does not increase the footprint or use of the facility or right-of-way, minimizes disturbance and clearing to only the extent necessary to perform the work, and restores disturbed areas within one year of the maintenance activity. If the use of herbicides is needed, only those approved for aquatic use may be used by a Washington State Licensed Applicator. 5. The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops and provided the harvesting does not require tilling of soil, planting of crops, chemical applications, or the alteration of the wetland by changing existing topography, water conditions, or water sources. 6. Drilling for utilities/utility corridors under a buffer, with entrance/exit portals located completely outside of the wetland buffer boundary, provided that the drilling does not alter the ground water connection to the wetland or percolation of surface water down through the soil column. Specific studies by a hydrologist are necessary to determine whether the ground water connection to the wetland or percolation of surface water down through the soil column would be disturbed. 7. Enhancement of a wetland buffer through the removal of non-native, invasive plant species by hand. All removed plant material must be taken away from the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed Control Board list of noxious weeds should be handled and disposed of according to a noxious weed control plan appropriate to that species. Revegetation with appropriate native species at natural densities is allowed in conjunction with removal of invasive plant species. 8. Repair and maintenance of legally established non-conforming uses or structures, provided they do not increase the degree of nonconformity and meet all other criteria established in PAMC 15.22.060.C. L. Overlapping critical area buffers. If buffers for two critical areas overlap, such as buffers for a stream and a wetland, the wider buffer applies. 15.22.250 Critical area report additional requirements. The following information is required for any proposed use or activity in a wetland or its buffer, in addition to the minimum critical area report requirements pursuant to PAMC 15.22.120. A. A wetland report must be prepared by a qualified wetland professional. B. Wetland Report. The following areas must be addressed in the wetland report: 1. The project area of the proposed activity; 2. All wetlands identified within 300 feet of the project area; 3. The wetland rating and associated buffer for all wetlands identified within 300 feet of the project area; 4. All shorelines, floodplains, or other applicable critical areas and their associated buffers within 300 feet of the project area. 5. A wetland analysis that includes a written assessment and accompanying maps of the wetlands and buffers within 300 feet of the project area, including the following information at a minimum: a. Wetland delineation, size (acreage) and required buffers based on a professional survey from the field delineation; b. Wetland category, including a description of and score for each function, per wetland ratings PAMC 15.22.220.C; c. Cowardian classification system and vegetation class, as well as the area of each class present; d. Hydrogeomorphic class or classes; November 4, 2026 G - 43 Attachment 2 MCA 26-0090 33 e. Soil and substrate conditions; f. Topographic elevations, at two-foot contours; g. An assessment of mitigation sequencing including avoidance, minimization, and mitigation proposed to ensure no net loss of wetland ecological functions and values, clearly identifying and describing any proposed unavoidable impacts and the compensatory mitigation planned for each impact. 15.22.260 Mitigation requirements specific to wetlands. As a condition of any permit allowing alteration of wetlands and/or wetland buffers, or as an enforcement action for illegal modifications to a wetland and/or its buffer, the applicant or violator must engage in compensatory mitigation to offset the impacts resulting from the applicant’s or violator’s actions. A mitigation plan must be developed that is consistent with the minimum plan requirements pursuant to PAMC 15.22.140 and the Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans (Ecology Publication No. 06-06-011b, Olympia WA, March 2006 or as revised). The overall goal of any compensatory mitigation project must be to achieve no net loss of wetland functions and values, and to strive for a net gain over present conditions where feasible. A. Preference of mitigation actions. Mitigation actions must describe how the activity will improve wetland functions, environmental processes, or both, and must occur in the following order of preference after mitigation sequencing has been applied: 1. Restoration: Re-establishment of a former wetland that results in a gain in wetland area and functions through the manipulation of the physical, chemical, or biological characteristics of a site. Examples include removing fill, plugging ditches, or breaking drain tiles to res tore a wetland hydroperiod, which in turn will lead to restoring wetland biotic communities and environmental processes. 2. Restoration: Rehabilitation of hydrologic processes to a degraded wetland that results in a gain in wetland function but does not result in a gain in wetland area. Examples include breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. 3. Creation (establishment) of new wetland area and functions in a location where they did not previously occur. Establishment results in a gain in wetland area and functions. 4. Preservation (protection) of high-quality, at-risk wetlands when done in combination with creation and re-establishment. Preservation as the sole means of mitigation for wetland impacts may be allowed if the wetland area to be preserved meets all the following criteria: a. The preservation site is determined to be under imminent threat of destruction, adverse modification, or substantive degradation, specifically sites with the potential to experience a high rate of undesirable ecological change due to on- and/or off-site activities; b. The area proposed for protection is of high quality (scores between 20 – 27 points in the wetland rating system), or is critical to the health and ecological sustainability of the watershed or sub - basin. Some of the other high-quality features include: i. Category I or II wetlands using the most recent version of the Wetland Rating System for western Washington, including Wetlands of High Conservation Value; ii. Rare wetland types such as bogs, mature forested wetlands, estuaries, coastal lagoons, or those of high regional or watershed importance; iii. Habitat for threatened or endangered species (state, federal, or both); iv. Provides biological and/or hydrologic connectivity; v. Of regional or watershed importance as indicated in a watershed, salmon recovery, or basin plan; November 4, 2026 G - 44 Attachment 2 MCA 26-0090 34 vi. Large size with high species diversity (plants, animals, or both), high abundance of native species, or both; vii. A site that is continuous with the head of a watershed, or with a lake or pond in an upper watershed that significantly contributes to hydrologic processes and water quality. c. The protected wetland and buffer are protected in perpetuity through a conservation easement, deed restriction, or dedication as a separate tract; d. Establishment, restoration, and enhancement opportunities have also been considered, and preservation is the best mitigation option; and e. The site includes buffer areas adequate to protect the habitat and its functions from encroachment and degradation over time. 5. Enhancement of significantly degraded wetlands in combination with restoration or creation. Such enhancement should be part of a mitigation package that includes replacing the impacted area to meet appropriate ratio requirements. Special consideration must be given to the presence of Oregon Spotted Frogs, as they often use lower-quality wetland habitats that are often dominated by reed canary grass. Examples of enhancement projects may include the following: a. Removal of invasive species, including roots and root mats, such as reed canary grass, purple loosestrife, knotweed, or any other recognized noxious weed as identified by the Clallam County Noxious Weed Board; b. Scarification of soil and addition of organic material or other soil amendments; c. Planting trees and shrubs as an emergent wetland dominated by non-native vegetation; d. Grading to establish multiple hydrologic regimes, from long duration seasonally inundated to saturated; and e. Adding habitat features such as snags, large woody debris, brush piles, rock piles, and nest boxes. B. Compensatory mitigation locations. Under the 2008 Federal Mitigation Rule, applicants are required to use a watershed approach for compensatory mitigation to the extent appropriate and practicable. The goal is to maintain and improve the quality and quantity of aquatic resources within watersheds through strategic selection of compensatory mitigation sites, based on the following: 1. An understanding of how environmental processes, such as the movement of water, determine the characteristics and functions in a watershed; 2. Determining the extent to which the hydrologic processes, and thus the biological processes, have been altered; 3. Identifying areas where these environmental processes can be most effectively restored and where they need to be protected or maintained; and 4. Using compensatory mitigation to restore and protect those processes and replace wetland functions and types that are relatively rare or limited in the watershed due to historic losses. C. Mitigation banking. Credits from a wetland mitigation bank certified under Chapter 173-700 WAC may be used to compensate for impacts located within the service area specified in the mitigation bank instrument, if: 1. The proposal would provide appropriate compensation for the proposed impacts ; 2. The impact site is located in the same service area as the bank; 3. The proposed use of credits is consistent with the terms and conditions of the certified mitigation bank instrument; and November 4, 2026 G - 45 Attachment 2 MCA 26-0090 35 4. Replacement ratios using bank credits are consistent with replacement ratios specified in the certified mitigation bank instrument. D. In-Lieu Fee Mitigation. Development or use of an in-lieu fee program is allowed if the program is established consistent with federal and state regulations and policies. Using credits from an approved in -lieu-fee program must be consistent with mitigation sequencing pursuant to PAMC 15.22.130. E. Mitigation Ratios. The following ratios in Table 15.22.260-1 and consideration of factors described in this section must be used to determine the relative amount of created, re -established, re-habilitated, enhanced, or preserved that will be required to replace impacted wetlands. The first number refers to the amount of wetland area providing mitigation and the second refers to the amount of wetland area impacted or altered. If a mitigation bank or in-lieu-fee program is used for mitigation requirements, wetland ratios are not applied. The mitigation bank credit system or in-lieu fee program credit system, whichever applies, is used to determine the number and cost of the credits to be purchased to fulfill mitigation requirements. Table 15.22.260-1 Wetland Mitigation Ratios Creation or Re- establishment Re-habilitation Enhancement Preservation Category I, Mature Forested Wetlands 6:1 12:1 24:1 24:1 Category I, Estuarine 3:1 (re- establishment only) 6:1 Limited circumstances (case-by-case) 12:1 Category I, Coastal Lagoons 4:1 (re- establishment only) 8:1 Not considered an option 16:1 Category I (all others) 4:1 8:1 16:1 16:1 Category II 3:1 6:1 12:1 12:1 Category III 2:1 4:1 8:1 8:1 Category IV 1.5:1 3:1 6:1 6:1 15.22.270 Performance Standards and Requirements. A. Mitigation performance standards. The performance standards in this section must be incorporated into the mitigation plans submitted to the City for impacts to wetlands and/or wetland buffers. The following standards apply to any mitigation proposed within Category I, II, III , and IV wetlands and their buffers. Modifications to these standards consistent with the guidance in “Wetland Mitigation in Washington State: Part 2 – Developing Mitigation Plans” may be considered for approval by the decision-maker as alternatives to the following: 1. Plants native to the region must be used; 2. Plant species selection must be consistent with the existing or projected hydrologic regime, including base water levels and stormwater event fluctuations; November 4, 2026 G - 46 Attachment 2 MCA 26-0090 36 3. Plant species selection must be consistent with the site environmental conditions, such as slope, aspect, soils, and exposure to the elements; 4. Plants should be commercially available or available from local sources. Small-form, bare-root plants are preferred over large specimens to reduce disturbance when planting; 5. Native plants species high in food and cover value for fish and wildlife should be prioritized, as appropriate, for the site; 6. Plant selection must be selected or approved by a qualified professional biologist, botanist, or ecologist; 7. A planting plan must be approved by the city; 8. Stockpiling soil and construction materials should be limited to upland areas outside of any tree protection zones, and contract specifications must limit stockpiling of materials to durations in accordance with city clearing and grading standards, unless otherwise approved by the City. 9. Irrigation must be installed or watering afforded by trucks or hoses to provide water for installed plants or seeded areas to supplement rainfall to ensure plants survive the first two years after installation. 10. All construction specifications and methods must be approved by a quali fied professional and the city. The city reserves the right to inspect all ongoing work on site through project completion. ARTICLE IV. CRITICAL AQUIFER RECHARGE AREAS 15.22.280 Purpose. A. Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect on aquifers used for potable water, including areas where an aquifer that is a source of drinking water is vulnerable to contamination that would affect the potability of the water, or is susceptible to reduced recharge, as defined by WAC 365-190-030. B. The purpose of this article is to protect the functions and values of groundwater by preventing pollution and maintaining supply for existing and planned potable uses, including public water systems and individual wells, and to protect groundwater that supplies stream baseflow, wetlands, and fish and wildlife habitat . The quality and quantity of groundwater in an aquifer is inextricably linked to its recharge area. It is the intent of this article to safeguard groundwater resources by mitigating or precluding future discharges of contaminants from new development activities and redevelopment activities. 15.22.290 Applicability and designation. A. Applicability. The provisions of this article apply to regulated facilities that are within or adjacent to those portions of the City of Port Angeles designated as critical aquifer recharge areas on the City’s critical areas map. Regulated activities or facilities are defined as those commercial, industrial, and home occupation uses that: 1. Process or handle hazardous materials in regulated quantities; and/or 2. Treat or store regulated quantities of hazardous materials. B. Designation. Critical aquifer recharge areas are those areas that include one or more of the following: 1. Areas served by groundwater which have been designated as a “sole source aquifer area” under the Federal Safe Drinking Water Act; 2. Areas designated as “wellhead protection areas” defined by the boundaries of the 10-year time of groundwater travel or boundaries established using alternate criteria provided by the Washington November 4, 2026 G - 47 Attachment 2 MCA 26-0090 37 State Department of Health in those settings where groundwater time of travel is not a reasonable delineation criterion, in accordance with WAC 246-290-135; 3. Susceptible groundwater management areas that have been designated as moderately or highly vulnerable or susceptible in an adopted groundwater management program developed pursuant to Chapter 173-100 WAC; 4. Special protection areas defined by WAC 173-200-900; or 5. Moderately or highly vulnerable aquifer recharge areas to degradation or depletion because of hydrogeologic characteristics that are delineated by a hydrogeologic study prepared in accordance with the State Department of Ecology guidelines. 15.22.300 Regulated activities. A. Activities or uses that do not cause degradation of groundwater quality and will not adversely affect the recharging of the aquifer may be permitted in a critical aquifer recharge area, and do not require preparation of a critical area report; provided, that they comply with the City of Port Angeles stormwater management regulations and applicable state and federal regulations. These activities typically include residential, commercial, and industrial development that does not include storage, processing, or handling of any dangerous waste of hazardous substance, or other development that does not substantially divert, alter, or reduce the flow of ground or surface waters. B. Activities that have the potential to cause degradation of groundwater quality or adversely affect the recharging of the aquifer may be permitted in critical aquifer recharge areas only in accordance with an approved critical area report and mitigation plan. These activities include, but are not limited to: 1. Aboveground/Underground Storage Tanks or vaults. The City of Port Angeles specifically regulates and authorizes permits for aboveground and underground storage tanks pursuant to the International Fire Code and this chapter. The Washington Department of Ecology also regulates and authorizes permits for underground storage tanks pursuant to Chapter 173-360 WAC. The removal of abandoned The City of Port Angeles Fire Department regulates and authorizes permits for the removal of abandoned underground storage tanks. 2. Agriculture. Agricultural uses, defined as commercial farming and animal husbandry. 3. Land Disturbing Activities. Activities that substantially divert, alter, or reduce the flow of ground or surface waters, or otherwise adversely affect aquifer recharge. 15.22.310 Critical area report additional requirements. A. For all regulated activities, the applicant must submit a report describing the best management practices to be used to minimize the risk of aquifer contamination. In addition to the minimum report requirements pursuant to PAMC 15.22.120, a critical area report for any regulated activity within a critical aquifer recharge area must contain the following: 1. A hydrogeologic assessment including, but not limited to, the following: a. Available information regarding geologic and hydrogeologic characteristics of the site, including the surface location of all critical aquifer recharge areas located on site or immediately adjacent to the site, and permeability of the unsaturated zone; b. Groundwater depth, flow direction, and gradient based on available information; c. Available well logs, borings, seeps/springs within 1,000 feet of the project area; d. Available ground and surface water quality data; e. Best management practices proposed to be used to minimize impacts to groundwater; November 4, 2026 G - 48 Attachment 2 MCA 26-0090 38 f. Groundwater monitoring plan provisions; g. Discussion of the effects of the proposed project on groundwater quality and quantity, including predictive evaluation of groundwater withdrawal effects on nearby wells and surface water features and predictive evaluation of contaminant transport based on potential releases to groundwater; h. A spill plan that identifies equipment and/or structures that could fail, resulting in an impact. Spill plans must include provisions for regular inspection, repair, replacement of structures and equipment that could fail, cleanup and disposal of all materials spilled ; and i. Description of potential mitigation measures, including any sampling schedules necessary should it be determined that the proposed project may have an adverse impact on groundwater resources. 2. If the hydrogeologic assessment determines that the facility will have no effect on groundwater resources, the facility is exempt from the development standard s as described in PAMC 15.22.320. 3. If the hydrogeologic assessment determined that the facility could have an effect on groundwater resources, the decision-maker will require implementation of applicable development standards in PAMC 15.22.320. 15.22.320 Protection and development standards for regulated activities. A. The following protection and development standards apply to the regulated activities and facilities in areas designated as critical aquifer recharge areas. 1. Aboveground/Underground Storage Tanks or Vaults. Aboveground/underground storage tanks or vaults for the storage of hazardous substances, animal wastes, sewage sludge, fertilizers, or other chemical or biological hazards or dangerous wastes as defined in Chapter 173-303 WAC, or any other substances, solids, or liquids in quantities identified by the Clallam County Environmental Health Division, consistent with Chapter 173-303, as a risk to groundwater quality, must be designed and constructed so as to: a. Prevent the release of such substances to the ground, ground waters, or surface waters; b. Have constructed around and under it, an impervious containment area enclosing or underlying the tank or part thereof. Impervious containment shall be greater than the volume of the storage area to avoid an overflow of the containment area; c. Provide for release detection; d. Provide written spill response and spill notification procedures to the Stormwater Division of the Port Angeles Public Works & Utilities Department; e. Use material in the construction or lining of the storage containment area which is compatible with the substance to be stored to protect against corrosion or leakage or otherwise designed in a manner to prevent the release or threatened release of any st ored substance; and f. Comply with Chapters 173-303 and 173-360 WAC. 2. Agriculture. New agriculture or hobby farms must use best management practices concerning animal husbandry, animal waste disposal, fertilizer use, pesticide use, and wastewater applications. It is highly recommended that farm owners and operators seek the technical as sistance of the Clallam County Conservation District for the development of Farm Management Plans. 3. Land disturbing activities. All ground disturbing activities likely to substantially divert, alter, or reduce the flow of ground or surface waters, or otherwise adversely affect aquifer recharge must implement best management practices (BMPs) for groundwater protection, consistent with Chapter 13.63, PAMC. November 4, 2026 G - 49 Attachment 2 MCA 26-0090 39 a. Stormwater infiltration must comply with Chapter 13.63 PAMC and the most recent update or version of the Department of Ecology’s Stormwater Management Manual for Western Washington. B. Prohibited uses. The following uses and activities for new development or redevelopment are prohibited within or adjacent to Critical Aquifer Recharge Areas, unless otherwise approved through a hydrogeologic assessment demonstrating no adverse impact: 1. Landfills or transfer stations; 2. Hazardous material disposal sites; 3. Outdoor wood preservation operations; 4. Manufacturing, processing, packaging, or storage of hazardous materials. ARTICLE V. FREQUENTLY FLOODED AREAS 15.22.330 Purpose. A. Frequently flooded areas include floodplains and other areas subject to flooding that perform important hydrologic functions and may present a risk to people and property. They include, but are not limited to, the 100-year floodplain designations of the Federal Emergency Management Act (FEMA), and the National Flood Insurance Program (NFIP), known as “special flood hazard areas” which are regulated under PAMC Chapter 15.12 – Flood Damage Prevention. B. The purpose of this article is to protect the ecological functions and values of floodplains while protecting buildings, infrastructure, and people from flood risk. 15.22.340 Designation. A. Special Flood Hazard Areas. Frequently flooded areas include those areas established as special flood hazard areas under PAMC Chapter 15.12, Flood Damage Prevention , including those areas of special flood hazard identified by the Federal Insurance Administrator in a scientific and engineering report entitled “The Flood Insurance Study (FIS) for Clallam County, WA and incorporated areas”, dated April 23, 2025 , and any revisions thereto, with accompanying Flood Insurance Rate Maps (FIRMs) dated April 23, 2025, and any revisions thereto. The best available information for flood hazard area identification as outlined in PAMC Chapter 15.12, Flood Damage Prevention, is the basis for regulation until a new FIRM is issued that incorporates the data utilized under PAMC Chapter 15.12, Flood Damage Prevention. B. Channel Migration Zones. Channel migration zones (CMZs) are areas in a floodplain where a stream or river channel can be expected to move naturally over time in response to gravity and topography. Development situated away from CMZs helps reduce flood and erosion hazards and costly repairs to infrastructure while preventing loss of crucial floodplain habitat. This area is designated using the method established by Rapp and Abbe that defines the CMZ as a composition of the following zones: 1. Historical migration zone. The Historical Migration Zone is the area the stream channel has occupied over the time period spanning the historical record as established through historical maps and aerials. 2. Avulsion hazard zone. The Avulsion Hazard Zone is an area deemed susceptible to avulsion of the main stem channel. Avulsions are abrupt switches in channel course than can have catastrophic consequences for existing floodplain development. Avulsion Hazard Zones may include low-lying floodplain areas capable of capturing main stem flows, and areas between channel bends prone to avulsions that cutoff meander bends. 3. Erosion hazard zone. The Erosion Hazard Zone is an area outside of the Historic Migration Zone that has a reasonable likelihood to be influenced by channel migration over the design life of the CMZ. A CMZ’s November 4, 2026 G - 50 Attachment 2 MCA 26-0090 40 Erosion Hazard Zone often extends outside and above the FEMA flood zones along actively migrating streams. 15.22.350 Mapping A. Reference Only. The maps and resources cited in this article are to be used as a guide for the City of Port Angeles Staff, project applicants, and/or property owners , and may be continuously updated as new critical areas are identified. They are a reference and do not provide a final critical area designation. The current FIRMs are filed at the office of the City Clerk, 321 East 5th Street, Port Angeles, WA 98362 and with the City’s GIS Division. 15.22.360 General development standards. A. All development proposals in frequently flooded areas must comply with PAMC Chapter 15.12, Flood Damage Prevention, for general and specific flood hazard protection. B. Base flood data and flood hazard notes must be shown the face of any recorded plat or binding site plan, including, but not limited to, base flood elevations, flood protection elevation, boundary of floodplain, and zero rise floodway. C. All development must conform to the provisions of the currently adopted International Building Code, including submittal of a critical area report. D. Development may not reduce the base flood water storage ability. Construction, grading, or other regulated activities that would reduce the flood water storage ability must be mitigated by creating compensatory storage on or off site. 15.22.370 Critical area report additional requirements. A. In addition to the minimum report contents required per PAMC 15.22.110, Critical area report, and PAMC 15.22.120, Minimum report requirements, any development proposal in a frequently flooded area must also contain the report requirements per PAMC 15.12.120.B. B. Habitat Assessment Required. Unless specifically exempted under subsection C, the critical area report must contain a habitat assessment prepared in accordance with the Regional Guidance for Floodplain Habitat Assessment and Mitigation (FEMA Region 10, 2013), or as hereafter amended. The habitat assessment is needed to identify the impact of the proposed development on existing floodplain and instream habitat functions and processes, and must contain, at a minimum, the following elements: 1. A description of the project area, including a map. 2. A description of the project area’s habitat including: a. Background research; b. Protected species identification; c. Site investigation; d. Habitat narrative; and e. Habitat area map. 3. A description of the project including the goal of the final project, construction processes and BMPs, and protection measures. 4. An assessment of the direct and indirect impacts of the action on any ESA-listed species and their aquatic, riparian, and floodplain habitat areas identified in the description of the project area’s habitat, as well as the cumulative effects of future actions that are reasonably certain to occur. Direct effects must be considered for the following: November 4, 2026 G - 51 Attachment 2 MCA 26-0090 41 a. First primary constituent element, such as freshwater spawning sites; b. Second primary constituent element, such as freshwater rearing sites; c. Third primary constituent element, such as freshwater migration corridors ; d. Essential Fish Habitat designated by the National Marine Fisheries Service; e. Fish and wildlife habitat conservation areas; f. Vegetation communities and habitat structures; g. Water quality; h. Water quantity, including flood and low flow depths, volumes and velocities; i. The channel’s planform pattern and migration processes; j. Spawning substrate, if applicable; and/or k. Floodplain refugia, if applicable. 5. The effects determination criteria must be consistent with that of the National Marine Fisheries Service, US Fish and Wildlife Service, and the US Army Corps of Engineers: 1. No effect (NE). The project has no effect, whatsoever, to the listed species or designated critical habitat. 2. May Affect, Not Likely to Adversely Affect (NLAA). Any negative effects to the listed species or designated critical habitat are insignificant and/or discountable. A determination of NLAA would also be made for those activities that have only a beneficial effect with no short - or long-term adverse effects. If the effects determination is NLAA, the report should indicate what steps were taken to avoid and minimize any negative project impacts and include a mitigation plan consistent with the guidance provided in the Habitat Assessment and Mitigation document referenced above. 3. Likely to Adversely Affect (LAA). The effects of the project will result in short- or long-term adverse effects on the identified species or designated habitat area. The assessment must include a mitigation plan consistent with the guidance provided in the Habitat Assessment and Mitigation document referenced above. 6. No short- or long-term effects to ESA-listed species or their designated critical habitats are allowed to occur within the Protection Area as established in the Regional Guidance for Floodplain Habitat Assessment and Mitigation, FEMA Region X, 2013. As such, avoidance is the only viable mitigation option. Outside of the Protected Area, any adverse effect must be fully mitigated to the extent practicable, and the proponent must demonstrate how each of the measures within the mitigation sequence will be used. C. Exemptions. The following activities are exempt from the habitat assessment requirements established above, provided all applicable federal, state, and local requirements are met. An exemption under this subsection does not apply to work in or over the stream channel, work that removes riparian vegetation unless allowed under subsection 2, or work where species listed under the federal Endangered Species Act or their designated critical habitat are present: 1. Repair of existing buildings or structures located entirely within the existing footprint, including damage by fire or other natural disasters, provided the repair is not a substantial improvement or is necessitated by substantial damage. To comply, such work must be less than 50% of the value of the structure(s); 2. Removal of noxious weeds, hazard trees, and replacement of non-native vegetation with native vegetation, provided the hazard tree does not provide critical habitat such as an eagle perch or occupied nest; November 4, 2026 G - 52 Attachment 2 MCA 26-0090 42 3. Ongoing maintenance activities such as lawn and garden maintenance of lawfully established landscaped areas that does not involve grading, excavating, or filling; 4. Normal maintenance of aboveground public utilities and facilities, such as replacing power lines and utility poles; 5. Activities with the sole purpose of creating, restoring, or enhancing natural functions associate with floodplains, lakes, estuaries, habitat, riparian areas, and streams that meet federal and state standards, provided the activities do not include structures, grading, fill, or impervious surface; 6. Normal maintenance of a levee or other flood control facility as prescribed in the operations and maintenance plan for the facility. Normal maintenance does not include repair from flood damage, any expansion of the prism, face or toe expansion, or the addition of material for protection or armor. ARTICLE VI. GEOLOGICALLY HAZARDOUS AREAS 15.22.380 Purpose. A. Geologically hazardous areas are areas that because of their susceptibility to erosion, sliding, earthquake, or other geological events, are not suited to siting commercial, residential, or industrial development consistent with public health or safety concerns. It is the purpose of this article is to reduce the risk of damage to structures and property from geologic hazards, to allow for natural geologic processes supportive of forming and maintaining fish and wildlife habitat, and to regulate and inform land use and planning decisions . It is recognized that the elimination of all risk from geologic hazards is not feasible to achieve, but the purpose of this article is to reduce the risk to acceptable levels. B. Special consideration will be given to climate change risks associated with geologically hazardous areas including flooding, sea level rise, and mass wasting/slope failures throughout this article. 15.22.390 Designation. A. The following areas situated within the City of Port Angeles are hereby established as geologically hazardous areas and are subject to the provisions of this chapter: 1. Erosion Hazard Areas. Erosion hazard areas are those areas containing soils which, according to the United States Department of Agriculture Natural Resources Conservation Service (NRCS) Soil Survey Program, may experience significant erosion. They also include coastal erosion-prone areas, channel migration zones, bluffs, steep slopes, and areas with unconsolidated soils. 2. Landslide Hazard Areas. Landslide hazard areas are areas at risk of mass movement due to a combination of geologic, topographic, and hydrologic factors. They include any areas susceptible to landslide because of any combination of bedrock, soil, slope, slope aspect, structure, hydrology , or other factors, and include, at a minimum, the following: a. Areas of historic failures, such as: i. Those areas delineated by the USDA NRCS as having a significant limitation for building site development; ii. Those coastal areas mapped as class u (unstable), uos (unstable old slides), and urs (unstable recent slides) in the department of ecology Washington Coastal Atlas; or iii. Areas designated as quaternary slumps, earthflows, mudflows, lahars, or landslides on maps published by the United States Geological Survey or Washington Department of Natural Resources. b. Areas with all three of the following characteristics: November 4, 2026 G - 53 Attachment 2 MCA 26-0090 43 i. Slopes steeper than 15 percent; ii. Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively impermeable sediment or bedrock; and iii. Springs or groundwater seepage. c. Areas that have shown movement from 10,000 years ago to the present, or which are underlain or covered by mass wastage debris of this epoch; d. Slopes that are parallel or subparallel to planes of weakness in subsurface materials; e. Slopes having gradients steeper than 80 percent subject to rockfall during seismic shaking; f. Areas potentially unstable as a result of rapid stream incision, stream bank erosion, and undercutting by wave action, including stream channel migration zones; g. Areas that show evidence of, or are at risk from snow avalanches; h. Areas located in a canyon or on an active alluvial fan, presently or potentially subject to inundation by debris flows or catastrophic flooding; and i. Any area with a slope of 40 percent or steeper and with a vertical relief of 10 or more feet except areas composed of bedrock. A slope is delineated by establishing its toe and top and measured by averaging the inclination over at least 10 feet of vertical relief. 3. Seismic hazard areas. Seismic hazard areas are areas subject to severe risk of damage as a result of earthquake induced ground shaking, slope failure, settlement or subsidence, soil liquefaction, surface faulting, debris flows, lahars, or tsunamis. 4. Tsunami hazard areas. Tsunami hazard areas include coastal areas and riverine shoreline areas susceptible to flooding, inundation, debris impact, and/or mass wasting as the result of coastal wave action generated by seismic events or other geologic events. 15.22.400 Mapping. A. The approximate location and extent of known potential geologically hazardous areas are shown on maps maintained by the City. The following resources provide information on the approximate location and extent of geologically hazardous areas and are hereby adopted by reference as amended: 1. Clallam County, Geohazards CCC 27.12.410; 2. Washington Department of Ecology, Coastal Zone Atlas; 3. U.S. Geological Survey geologic maps, landslide hazard maps, and seismic hazard maps; 4. Washington Department of Natural Resources Geologic Information Portal maps, including but not limited to landslides, tsunamis, earthquakes, and soil stability; and 5. USDA Natural Resources Conservation Service Web Soil Survey maps . B. Reference only. The maps and resources cited above are to be used as a guide for the City of Port Angeles Staff, project applicants, and/or property owners and may be continuously updated as new critical areas are identified. They are a reference and do not provide a final critical area designation. 15.22.410 General Development Standards. A. All development activities and uses are prohibited in geologically hazardous areas and their buffers, except as otherwise provided in this chapter under PAMC 15.22.070, Exempt Activities, 15.22.080, Allowed uses or activities, and 15.22.090, Permitted uses or activities. B. Approvals. New development proposals must be located and/or engineered and constructed to reduce risks to life, health, safety, and buildings, and not increase potential for landslides or erosion that could impact November 4, 2026 G - 54 Attachment 2 MCA 26-0090 44 either other properties, public resources, or other critical areas. The City may impose conditions on development activity in a geologically hazardous area as needed to: 1. Protect human life and safety; 2. Minimize the potential for property damage related to seismic events, erosion and/or landslides; 3. Minimize the need for stream or riverbank coastal bluff stabilization in the future; 4. Reduce public liabilities for damages associated with geologic hazards; 5. Protect slope stability and minimize erosion, seismic, and/or landslide hazard risks; 6. Maintain natural sediment and erosion processes that are integral to the health and sustainability of freshwater and marine ecosystems as well as minimizing impacts to stream, river, and coastal processes such as channel infill, channel migration, sediment transport, or flooding. C. Impact Avoidance. Impact avoidance measures must include, but not be limited to, locating the use/development outside of the hazard area, reducing the number, size, or scale of buildings and appurtenant features; altering the configuration or layout of the proposed development; implementing special engineering methods for construction, drainage, and stormwater runoff management; preserving native vegetation, and other feasible protective measures. D. Viewshed enhancement. In landslide and erosion hazard areas, the Director may approve alterations in vegetation coverage for the purposes of viewshed enhancement, so long as such alterations will not: 1. Increase geological hazards such as erosion potential, landslide potential, or seismic hazard potential , as demonstrated by a qualified professional; 2. Adversely affect fish and wildlife habitat conservation areas, including cumulative impacts to the functions and values of these areas; 3. Remove with appropriate pruning practices more than 25 percent of the live crown of a tree over the course of one growing season. Pruning must be in support of maintaining tree health and vigor and be in accordance with ANSI tree pruning practices. Tree topping is not an acceptable pruning practice; however, reduction may be utilized on deciduous trees only when approved by an ISA Certified Arborist as an acceptable practice. Window pruning is the preferred pruning method when feasible. 4. Include felling, topping, or removal of trees. If a violation of this subsection should occur, the landowner must replace any trees that are felled, topped, or removed with new trees at a ratio of 2:1 within one year of the action in accordance with an approved restoration plan. Tree species that are native to the site with a preference for drought tolerant species must be used. At least one of the replacement trees must be evergreen. 15.22.420 Specific Development Standards. A. Erosion or Landslide Hazard Areas. Areas containing or adjacent to erosion or landslide hazard areas may be altered only when the Director concludes, based on environmental information provided by a qualified professional, the following criteria are met in addition to the general development standards established in PAMC 15.22.410: 1. The proposed alteration includes all appropriate measures to avoid, eliminate, reduce, or otherwise mitigate risks to health and safety. 2. The proposed alteration is outside of an erosion or landslide hazard area and any required buffers as set forth in subsection B of this section. 3. The removal and disturbance of vegetation, clearing, or grading will be limited to the area of the approved development, and will otherwise not be disturbed. November 4, 2026 G - 55 Attachment 2 MCA 26-0090 45 4. The development is outside of the area of potential upslope or downslope surface movement or potential deposition in the event of slope failure. 5. The development will not increase or concentrate stormwater discharge or sedimentation to adjacent properties beyond predevelopment conditions. 6. The development will not decrease slope stability on adjacent properties or increase the risk or frequency of landslide occurrences. 7. The proposed alterations will not adversely impact other critical areas. 8. Structures and improvements will minimize alterations to the slope contour, and will be designed to minimize impervious lot coverage unless such alterations or impervious surfaces are needed to maintain slope stability. 9. Upon permit issuance, the property owner must sign and record a notice on title, at the owner’s sole expense, a covenant in a form acceptable to the City, which: a. Acknowledges and accepts the risks of the development in the landslide hazard area; b. Waives any rights to claims against the City; c. Indemnifies and holds harmless the City against claims, losses, and damages; and d. Informs subsequent owners of the property of the risks and the covenant. B. Erosion or landslide hazard area buffers. Buffers of undisturbed vegetation are required from the top, toe, and edges of any identified erosion or landslide hazard area in accordance with the following: 1. A minimum buffer of fifty (50) feet is established from the top, toe, and edges of erosion or landslide hazard areas for new developments, except as otherwise allowed under this s ubsection. The buffer may not be altered except by a general exemption, variance, or reasonable use exception approval, as authorized by this chapter; provided that such alterations meet all other standards for the protection of fish and wildlife habitat conservation areas. 2. Development proposals on sites that are directly adjacent to a wetland or other fish and wildlife habitat conservation area may be subject to additional buffer requirements and standards as set forth in the subsequent articles of this chapter. C. Buffer reduction. The buffer may be reduced by a maximum of 25 percent when a qualified professional is able to demonstrate to the satisfaction of the Director that the proposed development setback will: 1. Not adversely impact the stability of the erosion or landslide hazard area; 2. Not increase erosion and mass movement potential of the landslide hazard area; 3. Use construction techniques that minimize disruption of the existing topography and vegetation; 4. Include measures to overcome any geological, soils, and hydrological constraints of the site ; 5. Not adversely impact other critical areas; and 6. Through design and engineering solutions, provide protection to the proposed development and adjacent properties equal to that of the standard buffer . D. Increased buffer. The standard buffer may be increased by the decision-maker based on the critical area report by a qualified professional that indicates a greater buffer is necessary to protect the proposed development and/or adjacent properties. E. Seasonal restriction. Clearing within an erosion or landslide hazard area or buffer may be allowed only from May 1st to October 1st of each year; provided, that the decision-maker may extend or shorten the dry season on a case-by-case basis depending on actual weather conditions and other factors deemed relevant. November 4, 2026 G - 56 Attachment 2 MCA 26-0090 46 F. Stormwater management. Prior to any development activity, a plan for collection, transport, treatment and discharge of stormwater in accordance with the requirements of PAMC Chapter 13.63, or as amended, and in accordance with the current adopted Stormwater Management Manual for Western Washington , must be prepared and submitted for review. 15.22.430 Critical Area Report Additional Requirements. A. When City Critical Area Maps or other sources of credible information indicate that a site proposed for development or alteration is, or may be, located within an active or potentially geologically hazardous area, the Director will have the authority to require the submittal of a geotechnical report to be prepared by a qualified professional. B. Geotechnical Report Requirements. When required, a geotechnical report must include a field investigation and contain an assessment of whether the type of potential geologic hazard identified is present or not present and if development of the site will increase the potential for landslides or erosion on or off the site. Geotechnical reports must be prepared, stamped, and signed by a qualified professional . The report should: 1. Be appropriate for the scale and scope of the project; 2. Include a discussion of all geologically hazardous areas on the site and any geologically hazardous areas off site potentially impacted by or which could impact the proposed project. If the affected area extends beyond the subject property, the geology hazard assessment may utilize existing data sources pertaining to that area; 3. Clearly state that the proposed project will not decrease slope stability or pose an unreasonable threat to persons or property either on or off site and provide a rationale as to those conclusions based on geologic conditions and interpretations specific to the project; 4. Provide a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, and other adequate information to determine compliance with the requirements of this article; 5. Provide conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties; 6. Geotechnical reports must conform to accepted technical standards and generally follow the guidelines set forth in the Washington State Department of Licensing Guidelines for Preparing Engineering Geology Reports in Washington (2006). In some cases, such as when it is determined that no landslide or erosion risk is present, a full report may not be necessary to determine compliance with this article, and in those cases a stamped letter or abbreviated report may be provided; 7. If a landslide or erosion hazard is identified, provide a recommendation for the minimum no- disturbance buffer and minimum building setback for avoiding the landslide or erosion hazard, based upon the geotechnical analysis; 8. For projects in seismic hazard areas, the report must also include a detailed engineering evaluation of expected ground displacements, amplified seismic shaking, or other liquefaction and/or dynamic settlement effects and proposed mitigation measures to ensure an acceptable level of risk for the proposed structure type or other development facilities such as access roads and utilities. C. Duration. A geological assessment or report for a specific site may be valid for a period of up to five (5) years when the proposed land use activity and site conditions affecting the site are unchanged. However, if any surface and subsurface conditions associated with the site change during that five-year period, the applicant may be required to submit an amendment to the original geological assessment or report. November 4, 2026 G - 57 Attachment 2 MCA 26-0090 47 ARTICLE VII. FISH AND WILDLIFE HABITAT CONSERVATION AREAS 15.22.440 Purpose. A. The purposes of this article are to: 1. Ensure sufficient habitat quality, quantity, and connectivity to support long -term, viable populations of fish and wildlife species; 2. Prevent the creation of isolated subpopulations within their natural geographic distribution through development regulation to avoid habitat degradation and minimize fragmentation; 3. Protect, restore, and maintain native fish and wildlife populations by protecting and conserving fish and wildlife habitat through the protection and enhancement of the ecological processes, functions and values, and biodiversity that sustain these resources; 4. Protect valuable terrestrial habitats, streams and their associated riparian areas, and the ecosystem processes on which these areas depend. 15.22.450 Designation. A. Fish and Wildlife Habitat Conservation Areas (FWHCAs) are those areas identified as being of critical importance to the maintenance of certain fish, wildlife, and/or plant species populations. These areas are typically identified either by known point locations of specific species or by habitat areas, or both. All areas within the City meeting these criteria are hereby designated critical areas and are subject to the provisions of this article. Habitat conservation areas include all of the following: 1. Areas where endangered, threatened, and sensitive species have a primary association as indicated in the U.S . Fish and Wildlife’s Threatened and Endangered Species List of Critical Habitat List, the National Marine Fisheries Service, or the Washington Department of Fish and Wildlife’s Priority Habitats and Species List, as amended; 2. Commercial and recreational shellfish areas; 3. Kelp and eelgrass beds; herring, smelt, and other forage fish spawning areas as identified by the Washington State Department of Natural Resources and the Department of Ecology ; 4. Naturally occurring ponds under 20 acres and their submerged aquatic beds that provide fish or wildlife habitat. These do not include ponds deliberately designed and created from dry sites, such as canals, detention facilities, wastewater treatment facilities, farm ponds, temporary construction ponds, and landscape amenities; 5. Waters of the state as defined in RCW 90.48.020 to include lakes, rivers, ponds, streams, inland waters, underground waters, salt waters, and all other surface waters and watercourses in Washington, except that shorelines of the state are not considered critical areas as established in RCW 36.70A.480; 6. Lakes, ponds, streams, and rivers planted with game fish by a government or tribal entity; 7. State natural area preserves, natural resource conservation areas, and state wildlife areas ; and 8. Species and habitats of local importance as determined by the City. Locally important species and habitats have recreational, cultural, and/or economic values to the community. 15.22.460 Mapping. A. The approximate location and extent of identified fish, wildlife, and sensitive plant habitat areas are shown on the City’s critical area maps as well as state and federal maps and are for reference only. A location- specific assessment is necessary to determine the extent of the potential Habitat Conservation Area when a proposed use or activity is likely to contain a FWHCA. November 4, 2026 G - 58 Attachment 2 MCA 26-0090 48 B. The following maps and inventories are hereby adopted by reference, as amended: 1. U.S. Fish and Wildlife Service 2. National Oceanic and Atmospheric Administration Fisheries Northwest Region Critical Habitat Mapper; 3. Washington Department of Fish and Wildlife Priority Habitats and Species maps; 4. Washington Department of Natural Resources Natural Heritage Program mapping data; 5. Washington Department of Natural Resources State Natural Area Preserves and Natural Resource Conservation Area maps; 15.22.470 General development standards for all FWHCAs. A. All new development use and activity proposals are prohibited from fish and wildlife conservation areas and their buffers except in accordance with this chapter. Alteration of FWHCAs or their buffers is prohibited except as otherwise allowed by this Chapter and may occur only if the proposed alteration of the habitat and any associated mitigation proposed does not degrade the ecological functions and values of the habitat. B. Exemptions. Exemptions from this article are listed in the provisions established in PAMC 15.22.070. All other uses and activities are regulated under this chapter. C. Approvals and best available science. Any approval of alterations or impacts to a FWHCA must be supported by the best available science as described in the required critical area report . The decision-maker may condition approval of activities allowed within or adjacent to a FWHCA or its buffer as necessary to minimize or mitigate any potential adverse impacts and may include, but not be limited to, the following: 1. Establishment of buffer zones and building setbacks. Buffers must consist of an undisturbed area of native vegetation or areas identified for restoration or creation to protect the integrity , functions, and values of the affected habitat. Required buffer widths will reflect the sensitivity of the habitat and the type and intensity of the proposed activity; 2. Preservation or restoration of critically important vegetation and/or habitat features such as snags and downed large woody debris; 3. Preservation or enhancement of contiguous wildlife habitat corridors, to minimize fragmentation; 4. Limitation of access to the habitat area, including fencing or signage to deter unauthorized access, provided the fencing does not prohibit wildlife movement through the area; 5. Seasonal restriction of construction activities; 6. Establishment of a duration and timetable for periodic review of mitigation activities, if not already established in the mitigation plan; and 7. Requirement of a performance bond, when necessary, to ensure completion and success of proposed mitigation. D. Non-native species. No plant, wildlife, or fish species not indigenous to the region may be introduced into a FWHCA unless authorized by a state or federal permit or approval. E. Seasonal restrictions. When a species is more susceptible to adverse impacts during specific periods of the year, seasonal restrictions may apply. Larger buffers may be required and activities may be further restricted during the specified season for the applicable species. F. Subdivisions. The subdivision and short subdivision of land in FWHCAs and associated buffers is subject to the following: 1. Land that is located wholly within a FWHCA or its buffer may not be subdivided; November 4, 2026 G - 59 Attachment 2 MCA 26-0090 49 2. Land that is located partially within a FWHCA may be subdivided only if an accessible and contiguous portion of each new lot that meets the minimum lot size requirements for the zone is located outside of the FWHCA and its buffer; 3. Access roads and utilities serving a proposed subdivision may be permitted within the FWHCA and associated buffer only if the applicant’s qualified professional demonstrates, and the decision-maker determines, that no other feasible alternative exists, all unavoidable impacts are fully mitigated, and the use is consistent with this chapter; and 4. This subsection does not authorize new access roads and utilities in FWHCAs and associated buffers for existing subdivisions. G. Mitigation and Continuous Corridors. Mitigation sites must be located to preserve or achieve contiguous wildlife habitat corridors in accordance with a mitigation plan that is part of an approved critical area report to minimize the isolating effects of development on habitat areas and reduce fragmentation, so long as mitigation of aquatic habitat is located within the same aquatic ecosystem as the disturbed area. H. Mitigation and equivalent or greater biological functions. Mitigation for alterations to FWHCAs must achieve equivalent or greater biologic and hydrologic functions and must include mitigation for any adverse impacts up- or downstream of the project site. 15.22.480 Specific standards for riparian management zones. A. The Washington Department of Fish and Wildlife recognizes riparian ecosystems as a Priority Habitat for fish and wildlife. This area provides full ecological function for bank stability, shade, pollution removal, contributions of detrital nutrients, and recruitment of large woody debris. The City of Port Angeles hereby designates the riparian management zone (RMZ) as the location where protection and restoration of riparian ecosystem functions and values are addressed. B. Designation of the RMZ. The riparian management zone encompasses the riparian ecosystem and the channel migration zone to account for lateral movement of the riparian ecosystem over time. RMZs can also provide habitat for many terrestrial wildlife species and act as an important wildlife corridor. 1. The width of the RMZ is determined by the Site Potential Tree Height (SPTH200), which is the average maximum height of the tallest dominant tree for a given site class, or 100 feet, whichever is greater, measured horizontally. The RMZ is measured from whichever of the following features is furthest from the center of the watercourse: a. The ordinary high-water mark; b. The top of the stream bank; or c. The outer edge of the channel migration zone (if one exists). 2. Uses or activities that may impact an RMZ must provide a critical areas report prepared by a qualified professional describing the functions and values of the RMZ. The report must include the SPTH200 as determined by WDFW. If SPTH200 is calculated using site-scale data, that information must be included in the report, and clearly identify what inner measurement point was used and the extent of the RMZ with sufficient detail for field verification. The report must demonstrate that the project will result in no net loss of the ecological functions and values for the RMZ and associated species . C. Development standard for parcels containing an RMZ. Unless otherwise allowed in this chapter, all clearing, grading, new structures, or storage of materials and activities must be located outside of the RMZ , as defined in subsection B of this section. The following development standards apply for all parcels containing an RMZ: 1. In locations where an on-site sewage system is determined to be necessary, the system must be located outside of the RMZ; November 4, 2026 G - 60 Attachment 2 MCA 26-0090 50 2. New development that would require bank protection and/or hardening is prohibited, unless it addresses an imminent threat as an emergency activity. Consideration must be given to soft armoring prior to proposing hard armoring with any development proposal. 3. Due to the negative impact on RMZs, clearing, grading, and filling activities that cannot be located outside of the RMZ must limit disturbance and minimize effects to the greatest extent possible. Adequate mitigation must be demonstrated in the HMP pursuant to PAMC section 15.22.510.B. 4. Any action detrimental to habitat and any action affecting trees or vegetation, including but not limited to clearing or removal, are prohibited except as provided in PAMC 15.22.080. 5. If the RMZ is degraded due to the lack of trees or other native vegetation, the presence of invasive or nonnative species, and/or the presence of impervious surface or other development, the applicant must prepare and carry out a restoration plan that restores the ecological function of the RMZ to the extent commensurate with the impact of the development on the RMZ, and according to mitigation standards pursuant to PAMC 15.22.130 and 15.22.140. D. Piped watercourses and roadside ditches. The City recognizes that within the urban environment, many historical streams have been substantially modified to accommodate development, prior to the establishment of these regulations. Several of the regulated and mapped watercourses within the City of Port Angeles pass through natural reaches, modified reaches, piped reaches, and on occasion , along manmade roadside ditches. 1. Development along piped watercourses and ditches that do not meet the definition of a watercourse are subject to a 10-foot setback from the centerline of the pipes watercourse or ditch and are subject to the recording of a utility easement granted to the city for access and maintenance of the watercourse infrastructure. 2. The voluntary opening/daylighting and restoration or rehabilitation of a previously channelized, culverted, or piped watercourse is highly encouraged and may be approved by the decision -maker when the following is demonstrated in the critical area report: a. The restoration will result in a net gain in FWHCA functions, including an improvement in water quality, water storage capacity, and overall ecological functions ; b. Opened channels must be designed to support fish and wildlife habitat and uninhibited fish access, unless demonstrated to be infeasible; c. A reduction to the standard RMZ is allowed to a minimum of 25 feet, or as recommended by a qualified professional in the critical area report; d. The proposal will not significantly increase the threat of erosion, flooding, slope stability, or other natural hazards on the site or adjacent properties; e. The proposal must demonstrate by a hydraulic analysis from a qualified professional using the 100-year flow adjusted for projected climate change, that the opened channel and floodplain will convey and store flood flows without increasing flood risk to existing structures relative to existing conditions; f. The watercourse formerly in the pipe or culvert will be regulated as an RMZ , except for situations when the pipe or culvert was removed to provide for a publicly owned facility designed primarily for water quality treatment, flow control, or stormwater conveyance. E. Enhancement measures. Only those enhancement measures deemed most applicable and/or appropriate for RMZ enhancement projects will be considered in an EMZ modification proposal, and must be supported by best available science in the critical area report. These include, but are not limited to; 1. Removal of fish barriers to restore accessibility to fish; November 4, 2026 G - 61 Attachment 2 MCA 26-0090 51 2. Enhancement of fish habitat using large woody debris incorporated as part of a fish habitat enhancement plan; 3. Enhancement of fish and wildlife habitat structure that are likely to be used by wildlife, including wood duck houses, bat boxes, nesting platforms, the creation or retention of snags, rootwads/stumps, birdhouses, and heron nesting areas; 4. Planting native vegetation within the buffer area, especially vegetation that will increase value for fish and wildlife habitat, increase stream bank or slope stability, improve water quality and quantity, or provide aesthetic or recreational value; 5. Removal of invasive species and replacement with native vegetation consistent with best management practices for minimizing impacts to fish, wildlife, and their habitats, such as the use of hand tools or light equipment, use of aquatic herbicides and adjuvants regulated by the USDA and approved by the Department of Ecology, and minimizing soil compaction and erosion; 6. Creation of a surface channel where a watercourse was previously underground, in a culvert or pipe. Surface channels to be “daylighted” must be located in an RMZ and must be designed with energy dissipating functions or channel roughness features such as meanders and engineered log jams to reduce future bank failures and nearby flooding; 7. Removal or modification of existing stream culverts, such as road crossings, to improve fish passage, stream habitat, and flow capacities; or 8. Upgrading of retention/detention facilities or other stormwater management facilities beyond required levels. 15.22.490 Specific standards for all other FWHCAs. A. Endangered, threatened, and sensitive species. FWHCAs or buffers that have a primary association for state or federally endangered, threatened, or sensitive species or anadromous fish species are subject to the following: 1. No development is allowed within a FWHCA or buffer with which state or federally listed endangered, threatened, or sensitive species have a primary association, except that which is provided for by a management plan established by the Washington Department of Fish and Wildlife or applicable state or federal agency. 2. Whenever activities are proposed adjacent to a FWHCA with which state or federally endangered, threatened, or sensitive species have primary association, such areas must be protected through the application of protection measures in accordance with a critical area report prepared by a qualified professional and approved by the city. Alteration of the FWHCA or its buffer may not occur prior to consultation with the Washington Department of Fish and Wildlife, the Washington Department of Natural Resources, Tribes, or other appropriate federal or state agencies. 3. In kelp and eelgrass protection zones as established by the Washington Department of Fish and Wildlife, no-anchor zones must be established. B. Other priority habitats and species. Fish and wildlife habitat conservation areas or buffers with species that are not state or federally listed as endangered, threatened, or sensitive species, and are not anadromous fish species are subject to the following: 1. Development activities and uses that result in unavoidable impacts are prohibited except as otherwise allowed by this chapter and may occur in priority species habitat areas and associated buffers only i f the proposed alteration does not degrade the functions and values of the habitat in accordance with an approved critical area report with a habitat assessment/management plan, and only if the proposed activity is the only reasonable alternative that will accomplish the applicant’s objectives. Full November 4, 2026 G - 62 Attachment 2 MCA 26-0090 52 compensation for the loss of acreage and functions of habitat and buffer areas must be provided in compliance with the mitigation performance standards and requirements of this chapter. C. Required buffer for non-RMZ FWHCAs. Buffers from FWHCAs must be established to protect the functions and values of the critical area from the impacts of proposed adjacent activities. 1. Buffer widths for FWHCAs must be based on consideration of the following factors: species -specific recommendations of the Washington Department of Fish and Wildlife; recommendations contained in a habitat management plan submitted by a qualified professional; and the nature and intensity of land uses and activities occurring on the lands adjacent to the site. Buffers must: a. Consist of an undisturbed area of native vegetation, or areas identified for restoration, sufficient to protect the integrity, functions, and values of the affected habitat; b. Reflect the sensitivity of the habitat and the type and intensity of human activity proposed to be conducted nearby; c. Be consistent with the applicable species-specific management recommendation provided by the Washington Department of Fish and Wildlife. 2. Nesting bald eagles and their habitat. When activities are proposed adjacent to a confirmed bald eagle nest territory or communal roost, a bald eagle habitat management plan must be developed by a qualified professional consistent with the US Fish and Wildlife Service national bald eagle management guidelines. Activities are defined as being adjacent to managed bald eagle sites when they are within 600 feet of a nest or within one-half (1/2) mile of a shoreline foraging area. Approval of the activity must not occur prior to consultation with the state or federal agency with authority on bald eagle pairs and their nest. 15.22.500 Stormwater management facilities. A. Stormwater management facilities may not be located within stream buffers, with the following exceptions: 1. Conveyance systems may be located in stream buffers on a case-by-case basis if deemed necessary and approved by the Director of Public Works and Utilities. 2. Full dispersion of flow, as described in BMP T5.30 of the Department of Ecology's most current SWMMWW, may be allowed in a stream buffer if approved by the Director of Public Works and Utilities. 3. The facilities or methods specified in subsections A.1 and 2 of this section are allowed only if impacts to the buffer, resulting from their installation, are avoided or mitigated. 4. Stormwater management design and facilities must be consistent with PAMC Section 13.63.190, to protect the hydrology and functions of the RMZ. Native vegetation enhancement in RMZ buffers may be approved for both buffer enhancement and as part of a best management practice to meet low impact development stormwater standards required by the Washington State Department of Ecology. Any stormwater management facility or method associated with RMZs must meet the state requirements adopted in PAMC Section 13.63.190. 15.22.510 Critical area report additional requirements. In addition to the minimum report requirements of PAMC 15.22.120, critical area reports for FWHCAs must meet the requirements of this section. If a project in a FWHCA also has other designated critical areas, such as wetlands or frequently flooded areas, the critical areas report must contain all additional report requirements for each relevant critical area type. A. Prepared by a qualified professional. A critical areas report for FWHCAs must be prepared by a qualified professional biologist, botanist, or ecologist. November 4, 2026 G - 63 Attachment 2 MCA 26-0090 53 B. Habitat Management Plan Required. If an RMZ is found to be present and/or impacted by any proposed development, a Habitat Management Plan (HMP) must be included in the critical area report, to be prepared by a qualified professional biologist, botanist, or ecologist. The HMP must address the following: 1. The extent of critical areas within and adjacent to a proposed project site identified, along with the ecosystem functions and values that need protection; 2. Identify salmonids and other priority aquatic species that use the stream network in the immediate vicinity, as well as up- and downstream from the project site; 3. Identify any other Priority Species that may use the riparian corridor and any other Priority Habitats to which the corridor is connected; 4. Include a delineation map of the RMZ with field-verified ordinary high water mark(s) to be used for updating the City’s Critical Areas Maps; 5. Describe the relevant management recommendations for Priority Habitats and Species found on or near the site; 6. Identify and quantify current proposed disturbances to the RMZ and any other FWHCAs; 7. Include a description of the project proponent’s mitigation sequencing . If mitigation is necessary, the HMP should identify ways to improve riparian ecosystem function by enhancing riparian corridor connectivity, or by improving the quality of the riparian area; and 8. Describe requirements for monitoring and adaptive management, including identifying measurable standards and expectations to monitor compliance such as composition of riparian tree species, maximum invasive plant cover, and total extent of vegetation cover . Monitoring visits must be identified at an appropriate interval for the project and include measurable triggers for requiring further action, such as maximum percent area coverage of invasive plants. Clearly identify who is responsible for performing site visits and preparing and submitting any future reports to the City. 15.22.520 Performance standards and requirements. A. Mitigation for alterations to FWHCAs must achieve equivalent or greater biologic and hydrologic functions and must include mitigation for any adverse impacts up- or downstream of the project site, consistent with the requirements of this article and an approved Habitat Management Plan. November 4, 2026 G - 64 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 1 7/22/2026 Public Commenter Review materials and process Requested that presentation slides or handouts be made available and that agenda materials more clearly show proposed changes through redlines, highlighting, or similar formatting. Comment acknowledged. 2 7/22/2026 Public Commenter State deadline and compliance Asked what Department of Commerce deadline applies to the CAO update and what consequences, including potential grant impacts, could result from failure to comply. The City is required to adopt an updated CAO prior to December 31, 2026. Failure to do so would result in ineligibility of future grant sources from various state agencies such as the Department of Ecology. 3 7/22/2026 Public Commenter Best management practices Expressed concern that best management practices developed by professionals may reflect differing professional perspectives or biases. Best management practices are commonly developed by government agencies, environmental organizations and industry experts to guide sustainable and effective operations. This reduces potential bias and differing professional perspectives. 4 7/22/2026 Public Commenter Mitigation plans Asked whether mitigation plans are currently required for development affecting critical areas, whether the proposed ordinance changes those requirements, and whether plans must be prepared by a qualified professional. Mitigation plans are a current requirement of the existing CAO in situations where a regulated critical area is being impacted by development. The proposed changes to the regulation will not change this requirement, and the plans will still have to be prepared by a qualified professional, consistent with current regulations. 5 7/22/2026 Public Commenter Applicant costs and review time Expressed concern that additional studies, mitigation requirements, or professional review may increase applicant costs and extend development-review timelines. Additional studies, mitigation requirements, and professional review are already existing requirements within the City's CAO. Any proposed modifications to these requirements will not further exacerbate costs associated with developing in or adjacent to critical areas or extend review timelines beyond the SB5290 requirements. 6 7/22/2026 Public Commenter Review materials and timing Expressed concern that the approximately 140–150-page packet was provided only a few days before the meeting, limiting the time available for meaningful review. Comment acknowledged. 7 7/22/2026 Public Commenter Tree regulation outside critical areas Requested clear confirmation that a property owner may remove trees located outside a critical area or buffer without triggering the proposed CAO tree-protection requirements, subject to other applicable regulations. Current regulation does not prohibit tree removal from private property with the exception of the CAO and street trees located in the public right-of-way. Certain landscaping requirements must be met for commercial and mutli- family design standards, but more residential zones do not have existing tree removal regulations associated with them. 8 7/22/2026 Public Commenter Critical-area mapping Asked how the critical-area map was developed, who or what agency is responsible for the mapped information, and what source or authority guides its use. The City will be developing and managing the internal critical areas map based on the existing mapping tools that are managed by the applicable state or federal agency for each critical area. As agencies update their mapping tools, the City will follow suit to ensure the most up-to-date version exists within City- limits. 9 8/26/2026 Public Commenter Stakeholder outreach / technical practitioner input Asked whether the City timely sought input from local wetland-planning, civil-engineering, and similar practitioners—not only delineators—and suggested giving Zenovic & Associates or another local firm an opportunity to review the proposal. The updates to the CAO are open for review by any and all community members who wish to participate. The stakeholder working group was formed by internal discussions and was vetted by multiple City departments. Staff will reach out to local firms for their input prior to the close of the public hearing. Comments - Public Attachment 3 1November 4, 2026 G - 65 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 10 8/26/2026 Public Commenter Critical-area mapping / accuracy / applicant cost Expressed concern that combined City, county, state, and federal maps may show false-positive features, omit completed delineations, create confusing mapped 'blobs,' and require property owners to pay to disprove mapping errors; cited a mapped stream disproved by delineation and an older delineation still absent from a commonly used map. Staff acknolwedge that not all mapping tools and features are created equal, and that groundtruthing is an important part of performing any sort of analysis on a property that may contain a critical area. The due diligence has always been on the property owner to prove whether or not critical areas exist on a parcel. This regulation will not change with these updates. 11 8/26/2026 Public Commenter Regulatory costs / housing and building costs Referenced/submitted a Seattle Times cost editorial, expressed concern that layered state and federal mandates increase building costs, and urged the City to push back on costly requirements. The handout text itself is not contained in the transcript. Comment acknowledged. 12 9/10/2026 Public Commenter Development prohibitions in critical areas Opposed blanket prohibitions on development in critical areas, citing regulatory requests discussed at the August 25, 2026 City Council work session. Certain activities or uses are prohibited in specific critical areas, which are all indivdually outlined in the applicable articles. These prohibited uses and activities are in place to not only protect the critical area's functions and values, but often times to protect the development from any hazards associated with the critical area, such as landslides, flooding, or tsunamis. 13 9/10/2026 Public Commenter Industrial variances Opposed restrictions on industrial variances, citing the August 25, 2026 City Council work session. Comment acknowledged. At this time, the CAO does not intend to restrict industrial variances. Any individual or business is required to go through the same process for a variance pursuant to the criteria established in 15.22.100. 14 9/10/2026 Public Commenter Net ecological gain Opposed reinstating a “net ecological gain” standard.Comment acknowledged. The City's Comprehensive Plan indicates a strive for net gain, where feasible, while continuing to meet no-net-loss standards. This is reflected in the current proposed draft. 15 9/10/2026 Public Commenter Artificial-fill waterfront / existing industrial development Argued that the working waterfront and downtown were developed on artificial fill to support maritime and industrial activity and should be regulated in a manner that recognizes those conditions and economic functions, rather than treated like undisturbed natural areas. Staff recognize that the waterfront and downtown were developed on artifical fill to support the industries currently in place. These locations are still susceptible to sea level rise, tsunamis, and coastal flooding, and must be regulated accordingly. Protection standards are there to also protect infrastructure from natural hazards, should they arise. 16 9/10/2026 Public Commenter Economic impacts / environmental and economic balance Expressed concern that requirements exceeding state mandates would discourage business recruitment and retention, investment, and job creation and harm working-waterfront businesses and families. Urged rejection of the requested restrictions and a CAO that balances environmental protection with economic viability. Staff are proposing a balanced approach to environmental protection while also allowing for existing and new businesses to continue to operate within the bounds of what is reasonably acceptable. Attachment 3 2November 4, 2026 G - 66 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 17 9/17/2026 Public Commenter Viewshed pruning/Welcoming Vista Expressed concern over the current approach to viewshed pruning, specific to codification of "no topping, felling, or removal of trees" and the implications this has on the existing Welcoming Vista project. Suggested staff explore species conversion to maintain view corridors and ensure slope stability through the process of replacing dense, fast-growing deciduous trees with low-growing, native species. Staff recoginze the balance between maintaining and improving view corridors in critical areas with the need to maintain slope stability and reduce damage to infrastructure. The existing codified language around viewshed enhancements currently states that trees may not be felled, topped, or removed. Staff are not proposing new language in the updated CAO, but are continuing to use the existing, already codified language that promotoes tree health and vigor. The 10-year management plan involves species conversion, which has been part of the end-goal all along. The project will continue to work on opening view corridors, while replacing vegetation with more suitable species that are capable of ensuring slope stability and will not interfere with views into the future. 17 9/21/2026 Public Commenter Public hearing record Requested that the comment and referenced attachments be included in the record for the September 23, 2026 public hearing on proposed CAO MCA 26-0090. Comment acknowledged. 22 9/21/2026 Public Commenter Stormwater design / grant funding The stormwater design grant application deadline is September 30, seven days after this hearing. Please state whether the City can take any action toward an application by that date. If it cannot, please provide a written design and funding path for addressing the drainage conditions affecting Lang Heritage Homes. This request will be directed to the Public Works and Utilities Department. 23 9/22/2026 Public Commenter Existing homes, maintenance, and preventive erosion control Asked how the proposed 50-foot geologic-hazard buffer affects existing homes and what process allows routine maintenance, reasonable improvements, reconstruction, and preventive erosion or drainage work before an emergency. Comment acknowledged. The burden of proof for wetland evaluations lies with the applicant/deveoper on a case by case basis. 24 9/22/2026 Public Commenter Off-site and cumulative stormwater effects Asked how the City will evaluate and enforce cumulative runoff, erosion, vegetation, and slope- stability effects from neighboring bluff development when impacts extend beyond the applicant’s parcel. This request will be directed to the Public Works and Utilities Department. 25 9/22/2026 Public Commenter Privately owned bluff parcel and coordinated permits Asked what maintenance is allowed on a separately owned bluff parcel, including hazardous- tree removal, invasive vegetation management, drainage improvements, and preventive stabilization, and how permits for adjoining residential and critical-area parcels will be coordinated. A complete list of exempt, allowed, and permitted uses including maintenance, hazard tree removal, invasive species management and drainange improvements are found in sections 15.22.070 - 15.22.100. Any use or activity that is not listed as either exempt or allowed must undergo the full critical areas review, including reporting to be prepared by a qulified professional, provided the use is included as an allowed use in the underlying zone. 26 9/22/2026 Public Commenter Mapping and site- specific geological review Asked how mapped geologic-hazard boundaries will be field verified, how site-specific assessments will be used, and what an owner can do when a generalized map does not reflect site conditions. Mapping need only be field verified if a development proposal is being reviewed. If a landowner lives adjacent to a known critical area and is not planning to develop their parcel further, there would be no need to pay for a study to delineate the critical area in question. Attachment 3 3November 4, 2026 G - 67 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 27 9/22/2026 Public Commenter Guidance, costs, and shoreline overlap Requested guidance on the effect on existing homes, additional permits, professional studies and costs, and the interaction of the Critical Areas Ordinance with the Shoreline Master Program. Existing homes that do not meet the standards established in the updated regulation may continue to exist provided they meet the criteria of 15.22.060.C - modifications to existing nonconforming structures and uses. Based on recommendations and feedback from the Department of Ecology, there will be no connection between the SMP and the CAO by reference. Any property located in the shoreline jurisdiction will be managed under the SMP, not the CAO. 28 9/23/2026 Public Commenter Geotechnical report threshold for canopy thinning Requested clarification that minor canopy thinning without root or soil disturbance can be supported by an arborist rather than a full geotechnical report under PAMC 15.22.410.D.1. If a certified arborist has the knowledge, expertise and training needed to adequately demonstrate that canopy thinning can be done without increasing slope instability, then the report may be prepared by them. If they lack the expertise to make that decision, then the recommendation and reporting must be done by someone with that particular skill-set, who may be a civil engineer or geologist. 29 9/23/2026 Public Commenter ANSI A300 and the 25 percent five-year limit Asked whether the draft’s 25-percent canopy-removal limit over five years follows ANSI A300 or is a more restrictive City standard, and requested correction or an explanation of its basis. Upon further review of the ANSI A300 standards, staff have corrected the previous five-year allowance to a one-year growing cylce allowance, as established by industry standards. 30 9/23/2026 Public Commenter Existing bluff homes and mapping detail Asked that long-existing bluff homes and established careful tree maintenance be considered; said the geologic-hazard map boundaries near those homes are not shown clearly enough. Comment acknowledged. 31 9/23/2026 Public Commenter City storm drains, culverts, and sewer lines Raised concerns about aging City storm drains, culverts, and sewer lines in the bluff and requested attention to their maintenance and replacement. Infrastructure age and past plans are the commenters’ assertions.Comment acknowledged. 32 9/23/2026 Public Commenter Endorsement of prior written comments Joined the previously submitted September 22 bluff-owner letter and endorsed other September 10 and 17 public letters by reference; the referenced letters are not counted again as new submissions.Comment acknowledged. 33 9/23/2026 Public Commenter Welcoming Vista phased schedule Said the Welcoming Vista project’s ten-year phased tree-removal schedule may not keep pace with regrowth and requested a more effective view-restoration approach. Project expenditure and growth claims are the commenter’s.Comment acknowledged. 34 9/23/2026 Public Commenter Views, values, quality of life, and insurance Raised claimed effects of obstructed views on property value and quality of life and of mature trees on insurance underwriting and resident safety. Supporting studies were not supplied in the packet.Comment acknowledged. 35 9/23/2026 Public Commenter Single-phase clearing with revegetation Recommended allowing single-phase clearing for a viewshed enhancement area when paired with a professionally designed and promptly implemented native revegetation and slope- stabilization plan.Comment acknowledged. 36 9/23/2026 Public Commenter Permit standards and turnaround A local tree-service operator said requirements for disposing of pruned material have changed between years, making costs and scheduling unpredictable. Requested clear, consistent view- maintenance standards and permit timelines.Comment acknowledged. 37 9/23/2026 Public Commenter Permit fees and existing views Said homeowners pay a stated $588 per permit and requested a workable path to maintain established marine-bluff views that contributed to purchasing and valuing their homes.Staff have added a provision to allow for regular maintenance once a project has received an approved plan. See 15.22.080D.8.d 38 9/23/2026 Public Commenter Unpermitted work and local jobs Warned that unpredictable or unavailable permits may lead some owners to hire people willing to work without permits, disadvantaging licensed local contractors and their employees. Comment acknowledged. Attachment 3 4November 4, 2026 G - 68 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 39 9/23/2026 Public Commenter Critical-area map accuracy Said a map labels land adjacent to a parcel as critical without an apparent basis while omitting a wetland documented by a delineation on the speaker’s parcel. Mapping will be updated through the implementation phase. It is important to note that even with updated maps, maps are only to be used as a reference. Site specific delineations must still occur. 40 9/23/2026 Public Commenter Mapping and applicant costs Expressed concern that incomplete or inaccurate screening maps could create uncertainty and require owners to pay for studies to correct the record.Mapping need only be field verified if a development proposal is being reviewed. If a landowner lives adjacent to a known critical area and is not planning to develop their parcel further, there would be no need to pay for a study to delineate the critical area in question. 41 9/23/2026 Public Commenter Hearing scope and proposed change Asked which amendments were being considered and whether the Commission intended to change the ability to perform previously permitted view-enhancement work on City land.The Planning Commission does not have the authority to dictate City Policy, including the decision to allow for viewshed enhancement on City Land. 42 9/23/2026 Public Commenter Bluff drainage and public infrastructure Described water emerging from the bluff above Marine Drive and raised concerns about possible leaking utilities and maintenance of City culverts at the toe of the slope. These are the speaker’s observations and concerns.Comment acknowledged. 43 9/23/2026 Public Commenter Brix Marine slope treatment Raised concern that the Brix Marine proposal might lack adequate drainage and slope retention and could affect bluff stability. This is the speaker’s characterization, not a verified engineering conclusion.Comment acknowledged. 44 9/23/2026 Public Commenter Selective pruning on bluff properties Requested express permission for selective pruning using accepted arborist practices without tree topping, wholesale clearing, root disturbance, or increased slope and habitat risk. These provisions remain in the updated CAO. 45 9/23/2026 Public Commenter Views and property value Said Strait views are significant to bluff-home values and asked the Commission to consider the financial effect of losing the ability to maintain them.Comment acknowledged. 46 9/23/2026 Public Commenter Recurring view- maintenance process Requested a straightforward, affordable approval for recurring pruning under an approved plan as vegetation regrows. See 15.22.080.D.8.d 47 9/23/2026 Public Commenter Cliff House vegetation practices A condominium representative said the HOA has used a certified arborist and the City exemption process for limited thinning and limb reduction, without clear-cutting or disturbing roots. Comment acknowledged. These provisions will remain so long as the land on which the work is to be done is owned by the individual requesting the work. 48 9/23/2026 Public Commenter Clarity on responsible limb reduction Requested clear language distinguishing limited, professionally guided limb work from prohibited clearing, citing visibility, security, wind loading, and lower-unit views. Comment acknowledged. These provisions will remain and further guidance will be established in the city's soon to be drafted Urban Forest Management Plan. 49 9/23/2026 Public Commenter Guidance and reasonable timelines A bluff resident requested consistent guidance and timely permits for responsible view maintenance, while supporting ecological measures that protect the bluff. Comment acknowledged. These provisions will remain and further guidance will be established in the city's soon to be drafted Urban Forest Management Plan. 50 9/23/2026 Public Commenter Unpermitted cutting risk Warned that unclear rules and delays could lead to unauthorized tree cutting rather than professionally managed maintenance.Comment acknowledged. 51 9/23/2026 Public Commenter City owner signature on applications Said the City’s refusal to sign as owner for work on City-owned bluff parcels or the Fourth Street right of way leaves view-enhancement applications incomplete despite otherwise unchanged permit provisions.Comment acknowledged. 52 9/23/2026 Public Commenter Consistency of City- property decisions Questioned the City’s treatment of proposed vegetation work on public land and requested a clear, consistent decision path for its owner consent.The City is currently evaluating tree management on City-owned land, including the ROW and limited number of steep slope parcels it owns. 53 9/23/2026 Public Commenter Selective pruning repeated at hearing Restated during the formal hearing the request for selective pruning and an affordable recurring plan for existing bluff homes. This repeats the substance of the earlier general-public- comment turn.Comment acknowledged. Attachment 3 5November 4, 2026 G - 69 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 54 9/23/2026 Public Commenter Existing homes and preventive stabilization Asked how the ordinance affects existing homes and how owners can address bluff instability before an emergency; noted that the presentation had addressed the existing-home question. Emergency provisions can be found in the draft under 15.22.070. 55 9/23/2026 Public Commenter Affordable professional maintenance Requested a clear recurring-maintenance standard that licensed local professionals can follow without a costly new approval each time vegetation regrows. See 15.22.080.D.8.d 56 9/23/2026 Public Commenter Certified arborists and existing process A bluff homeowner said neighbors have paid for certified-arborist work to maintain views and urged the City to keep a workable process for responsible maintenance. See 15.22.080.D.8.d 57 9/23/2026 Public Commenter Consent for City-owned parcels Requested a reasonable process for obtaining City consent where vegetation to be maintained is on City-owned parcels between homes and the water.The City is currently evaluating tree management on City-owned land, including the ROW and limited number of steep slope parcels it owns. 58 9/23/2026 Public Commenter City permission on its property Asked whether the City intends to withhold permission for view work on City-owned property and whether the Commission can address that City policy question.The City is currently evaluating tree management on City-owned land, including the ROW and limited number of steep slope parcels it owns. Planning Commission cannot make decisions on policy. That lies with City Council. 59 9/23/2026 Public Commenter Brix Marine drainage and hazard review Questioned whether the Brix Marine project’s drainage and slope design adequately addresses bluff hazards under the proposed standards. Project-risk assertions are the commenter’s.The Brix Marine project was approved under the existing standards and is not required to meet the proposed standards as they have not yet been adopted. 60 9/23/2026 Public Commenter Bluff values and drainage history Supported neighboring owners’ concerns about home values and recalled prior drainage problems after heavy rain.Comment acknowledged. 61 9/23/2026 Public Commenter Previously authorized views A Fourth Street resident said earlier City permission and an arborist supported view maintenance, but later permit efforts encountered obstacles.Comment acknowledged. 62 9/23/2026 Public Commenter Financial effects and hearing process Asked whether the proposed rules would diminish an established view and home value, and whether state and federal requirements left room for the hearing to affect the outcome. See 15.22.080.D.8.d 63 9/23/2026 Public Commenter Incomplete exemption application A tree-service employee said a West Fourth Street ESE application was deemed incomplete while the City evaluates tree management and requires its signature as landowner before submission. The City is currently evaluating tree management on City-owned land, including the ROW and limited number of steep slope parcels it owns. 64 9/23/2026 Public Commenter City tree-work plans and local contractors Asked when the City would decide whether to allow vegetation work on its property, whether it would perform the work itself, and how that would affect small local tree services.The City is currently evaluating tree management on City-owned land, including the ROW and limited number of steep slope parcels it owns. 65 9/23/2026 Public Commenter Permit-process burden Described routine City permit processing as cumbersome and encouraged affected residents to bring specific examples to Council.Comment acknowledged. 66 9/23/2026 Public Commenter Bluff enforcement follow-through A condominium resident described reporting unpermitted bluff clearing and said requested enforcement updates had not been received. This is the speaker’s account.The landowner would need to follow up with Code Enforcement on this matter. 67 9/23/2026 Public Commenter Delay and resident safety Described delays addressing an encampment near the condominium and the effect residents said it had on their sense of safety. This is the speaker’s account. The landowner would need to follow up with Code Enforcement on this matter. 68 9/23/2026 Public Commenter Vegetation restrictions and values Asked for clear, workable rules for limited professional vegetation management and said unnecessary restrictions can affect property values and tax burdens. Comment acknowledged. Attachment 3 6November 4, 2026 G - 70 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 1 22-Jul-26 Planning Commission Comprehensive Plan consistency Asked whether the Critical Areas Ordinance update must also comply with the Comprehensive Plan. Yes. The updates to the CAO will need to achieve the goals and policies set forth in the recently updated Comprehensive Plan while also adhering to the requirements for compliance with the GMA. 2 22-Jul-26 Planning Commission Housing/development versus environmental protection Requested clarification of how the City would prioritize housing or development when tree, wetland, or other environmental protections conflict with development objectives. Housing may be permitted in locations that are otherwise encumbered by a critical area, pursuant to a reasonable use exception. Compensatory mitigaiton is needed in sitauations where impacts to a critical area cannot be avoided through a proposed development. 3 22-Jul-26 Planning Commission General implementation; Housing and permit predictability Expressed concern that critical-area, SEPA, or other local review processes could recreate discretionary barriers, uncertainty, and delays that increase development costs and conflict with Comprehensive Plan housing-production objectives. Regulations are already in place for development in critical areas, and when required, for the State Environmental Policy Act. The need to balance multiple goals and policies in the comprehensive plan including housing-production objectives and environmental regulation can best be achieved through smart land use planning that prioritizes infill and redevelopment in locations that are void of critical areas to reduce costs associated with affordable developments. 4 22-Jul-26 Planning Commission Tree protection and critical- area applicability Asked how tree protection applies when development affects a tree and whether the two-for- one tree-replacement provision would apply. In critical areas specifically, trees that are removed through development must be replaced at a 2:1 ratio. Further regulation regarding tree removals and replacements will be addressed at a later time when staff complete the Urban Forestry Chapter. 5 22-Jul-26 Planning Commission Tree protection outside critical areas Asked whether trees on vacant lots outside critical areas may be removed without triggering the proposed critical-area requirements. At this time, the only other regulations that exist in city code regarding tree removals are those that are located in public right-of-way, and commercial and multi-family landscapes. No other regulation exists at this time that would prohibit tree removals on private property outisde of critical areas. 7 22-Jul-26 Planning Commission PAMC 15.02 — Best Available Science Asked whether Best Available Science developed by local, state, federal, or tribal sources must meet the criteria established in the Washington Administrative Code. The definition of "best available science" as proposed is from the applicable Washington Administrative Code and must meet the criteria as established. 8 22-Jul-26 Planning Commission PAMC 15.02 — Best management practices Asked who develops or establishes the best management practices that would be used to implement the ordinance. Best management practices are commonly developed by government agencies, environmental organizations and industry experts to guide sustainable and effective operations. This reduces potential bias and differing professional perspectives. 9 22-Jul-26 Planning Commission Critical-area mapping; Critical aquifer recharge areas Emphasized the need to understand how critical areas will be mapped and the extent of properties potentially affected, particularly where mapped critical aquifer recharge areas encompass substantial portions of the City. Mapping will be based on the designations of each critical area. While many parcels will fall within a critical aquifer recharage area, not all uses and activities on those parcels will be applicable to the regulations. 10 22-Jul-26 Planning Commission Critical aquifer recharge area applicability Asked whether every property within the mapped critical aquifer recharge area would be affected by the ordinance. Not all properties or uses that exist in critical aquifer recharge areas will be affected by the ordinance. Regulated activities will be those commercial, industrial, or home occupations that process or handle hazardous materials in regulated quantities and/or treat or store regulated quantities of hazardous materials. 11 22-Jul-26 Planning Commission Future water supply and aquifer protection Noted that future alternative water-supply needs could justify retaining aquifer mapping and protection work even if it was not currently mandatory. Comment acknowledged. 12 22-Jul-26 Planning Commission Critical-area delineation Asked whether definitions should identify the standards and methods used to delineate each type of critical area, including wetland delineation standards. The standards for designating each critical area are defined in the applicable articles. 13 22-Jul-26 Planning Commission Critical-area functions and values Asked how and when existing critical-area functions and values will be identified during site screening and review. The functions and values of the critical area identified will need to be addressed through the reporting process and evaluated by the qualified professional with expertise in the applicable critical area. Comments - Planning Commission Attachment 3 7November 4, 2026 G - 71 14 22-Jul-26 Planning Commission PAMC 15.02 — Best Available Science; Tribal information Raised concern regarding references to Tribes within the Best Available Science provisions and requested consideration of how tribal information and the City's relationship with sovereign tribal governments are reflected in the ordinance. The inclusion of tribes in the definition of "best available science" comes from WAC 365-195-910(1) which states, "consultation with state and federal agencies and tribes can provide a quick and cost-effective way to develop scientific information and recommendations." 15 22-Jul-26 Planning Commission PAMC 15.02 — Best Available Science Commented that the proposed Best Available Science definition may be narrower than the cited WAC because it appears to focus on who prepared the information rather than the validity of the scientific process. Comment acknowledged. Staff have updated the definition to be more consistent with those of other jurisdictions, which now reads as follows: "Best available science" means the current scientific information derived from a valid scientific process consistent with criteria established in WAC 365-195- 900 through WAC 365-195-925 used in the process to designate, protect, and/or restore critical areas 16 22-Jul-26 Planning Commission PAMC 15.02 — Buffer Commented that defining a buffer as entirely “undisturbed” or “untouched” may conflict with later provisions allowing restoration, maintenance, trails, utilities, or other authorized activities within buffers; requested clarification. Staff acknowledge this and added the following to the end of the definition: unless otherwise exempted, allowed, or permitted by this chapter. 17 22-Jul-26 Planning Commission PAMC 15.02 — Development Asked whether activities included within the definition of “development” automatically require critical-area review or only when the activity may affect a critical area or buffer. Critical area review will only be required when the activity may impact a critical area or its buffer. 18 22-Jul-26 Planning Commission PAMC 15.02 — Habitats of local importance Commented that the definition appears circular because it defines habitats of local importance as habitat areas found to be locally important; requested clarification. Comment acknowledged. The definition is intended to be broad so as to not limit which habitats and species the City has identified as being of local importance. 19 22-Jul-26 Planning Commission No-net-loss punctuation Asked whether the no-net-loss definition was incomplete or missing a period.The definition was missing a period. Staff have corrected this. 20 22-Jul-26 Planning Commission PAMC 15.02 — Historical condition Questioned what baseline is intended by “historical condition,” noting that conditions before an area was altered may be unknown or could extend far into the past. Staff have replaced the definition of "historic condition" with that of "reference condition" which means a baseline standard, benchmark, or set of normal measurements used to compare and evaluate the health, quality, or performance of an ecosystem, environment, or scientific system. 21 22-Jul-26 Planning Commission PAMC 15.02 — Land disturbance activity Requested a clearer threshold for what constitutes land disturbance, including whether routine access, gardening, or minor soil disturbance would fall within the definition. Staff have added additional language to the definition of "land disturbing activity" that states minor soil disturbance for site-investigation puroposes or routine garden maintenance are not considered land-disturbing activities. 22 22-Jul-26 Planning Commission PAMC 15.02 — Locally unique features Requested clarification or revision of the use of “usually” within the definition because it creates uncertainty regarding conditions that fall outside the typical description. Staff have replaced the word "usually" with "often" in this definition. 23 22-Jul-26 Planning Commission PAMC 15.02 — Waters of the state Asked whether “waters of the state” is intended to include all surface waters and requested clearer language distinguishing regulated waters from artificial or constructed water features. The definition of "Waters of the State" has been relocated to 15.22.450.A.5 and the definition is consistent with that of RCW 90.48.020. While these do include surface waters, ponds that are less than 20-acres in size that were deliberately created from dry sites, including farm ponds and landscape amenities are not included in this definition. 24 22-Jul-26 Planning Commission PAMC 15.02 — Qualified professional Requested clarification of the education, experience, certification, and licensing requirements for qualified professionals, including whether the required professional experience applies to all listed degrees or only related fields. The definition of "qualified professional" has been modified to be more consistent with that of other jurisdictions, indicating what qualifications an individual must have specific to the critical area identified. Attachment 3 8November 4, 2026 G - 72 25 22-Jul-26 Planning Commission PAMC 15.02 — Riparian management zone / Site- potential tree height Requested explanation of the scientific and regulatory basis for the 100- and 200-year site- potential tree-height concepts used in defining riparian management zones. Site-potential tree height is based on a conceptual model developed by the Forest Ecosystem Management Assessment Team to determine how to protect riparian areas in forested landscapes. The model conveys two important points: 1) four of the five riparian ecosystem functions or processes occur within one 200-year-SPTH, and 2) the marginal return for each function or process decreases as distance from the stream channel increases. Thus, designating a riparian area based on at least one SPTH at 200-years is a scientifically supported approach if the goal is to protect and maintain full function of the riparian ecosystem for aquatic habitats and species, including salmon. 26 22-Jul-26 Planning Commission Qualified professionals; Conflicting professional opinions Asked which qualified professional controls when the City and an applicant rely on different professionals or technical opinions, how a third-party review would be initiated, and who bears the cost. The City has the internal knowledge and capcity to review most technical reports prepared by a qualified professional. In some situations, if staff do not agree with the assessments prepared, they may hire a third-party reviewer to read and review the reports prepared by the applicant for consistency with the CAO. In this situation, the cost associated would be borne by the applicant. 27 22-Jul-26 Planning Commission PAMC 15.02 — Critical-area setback Requested clarification of the critical-area setback definition, including how it differs from other setbacks in City code and whether it is intended primarily to protect development from hazardous conditions or protect the critical area. The definition of setback in this chapter is specific to critical areas, as are all other definitions defined in Chapter 15.02. Building setbacks adjacent to critical areas are important for protecting the functions and values of the critical area while also protecting the development from potential hazards associated with the critical area. 28 22-Jul-26 Planning Commission Chapter structure and review scope Asked whether Chapter 15.20 was being deleted and replaced by Chapter 15.22 and why the new chapter was not being reviewed in full. Yes, Chapter 15.20 is being replaced with Chapter 15.22. At the time of the July meeting, not all of Chapter 15.22 had been drafted so the review of all applicable articles will be phased. 29 22-Jul-26 Planning Commission Shane Park; Artificial or created wetlands Asked whether the ponded area at Shane Park, which may have resulted from prior City actions, could now constitute a regulated wetland and whether the City plans to review the area. Given the criteria that define a wetland, it is possible that this location would now be classified as such. Staff will discuss this topic in greater detail with the Parks & Recreation Director upon adoption of the CAO. 30 22-Jul-26 Planning Commission Review instructions and material scope Expressed concern that including Chapter 15.22 materials while assigning only selected sections for line-by-line review was confusing. Comment acknowledged. 31 22-Jul-26 Planning Commission PAMC 15.22.070(F)(1) — Emergency activities Requested clarification of how the 30-day post-emergency reporting requirement will be enforced and what consequences apply if required reporting is not completed. Failure to comply with the requirements of this section would result in an unauthorized modification and would be subject to enforcement provisions of the Port Angeles Municpal Code at the owner's or other responsible party's expense. 32 22-Jul-26 Planning Commission PAMC 15.22.070 — Exempt activities Commented that the exemption provisions appear to retain certain best-practice, restoration, mitigation, or other obligations, making it unclear which requirements do and do not apply to an exempt activity and whether a City determination is required. While exempt activities are not required to undergo full critical area review, they still must adhere to best management practices that minimize or otherwise do not degrade a critical area or its buffer. These activities are unlikley to disturb a critical area or its buffer due to the nature of the activity or the location where the activity takes place, such as in a lawfully established garden or landscape. Any activity that does not specifically meet the definition of those in 15.22.070.F 1-5. 33 22-Jul-26 Planning Commission PAMC 15.22.070 — Routine landscaping and maintenance Asked what routine landscaping, gardening, maintenance, or community cleanup activities are allowed under the exemption provisions and whether activities such as organized vegetation cleanup near bluffs could require review. If the landscaped or garden area was lawfully created, meaning it has undergone previous critical areas review, the activities defined in 15.22.070.F.2 would be considered exempt. "Organized vegetation cleanup" that has not previously been reviewed under the critical areas regulation would require an approved restoration and management plan that would be subject to review. Once approved, future maintenance of those areas would be considered exempt. Attachment 3 9November 4, 2026 G - 73 34 22-Jul-26 Planning Commission PAMC 15.22.070(B) — Reasonable methods Asked who determines what constitutes “reasonable methods” to avoid potential impacts when conducting an exempt activity. The exempt activities contain specific measures in their definitions that outline how to undergo the activity without impacting the criticial area or buffer. If the proponent determines at any point that their methods may not be considered reasonable, the burden of proof lies with the proponent and the decision on whether they are or not will be made by the Director of Community and Economic Development. 35 22-Jul-26 Planning Commission PAMC 15.22.080(A) — Allowed activities and avoidance Commented that an absolute requirement to avoid impacts appears inconsistent with later provisions allowing utilities, trails, vegetation management, and hazard-tree work; requested language recognizing allowable impacts where avoidance is not feasible. Staff have modified the sentence to the following to minimize confusion and inconsistency: "All allowed activities must use mitigatoin sequencing and best management practices that result in the least amount of impact to the critical areas where practicable." 36 22-Jul-26 Planning Commission PAMC 15.22.080 — Site investigation Requested clarification that limited vegetation or soil disturbance necessary for activities such as wetland delineation and site investigation is allowed. Yes, minimal soil disturbance and vegetation removal of non-tree or shrubs is allowed (such as grass and other herbaceous plants), provided the areas that are disturbed are properly restored to minimize erosion and sedimentation. 37 22-Jul-26 Planning Commission PAMC 15.22.080 — Minor utility projects Initially asked for clarification of “minor utility project,” then located the 75-square-foot threshold in the draft and withdrew the question. Comment acknowledged. 38 22-Jul-26 Planning Commission PAMC 15.22.080 — Viewshed enhancement Raised concern that allowing tree thinning for viewshed enhancement could result in incremental damage or loss of trees and requested consideration of whether the exception is appropriate and sufficiently protective. The provisions established for viewshed enhancement have been drafted to ensure that best practices are utilized. Further management practices and guidance will be established in the preparation of the Urban Forest Management Plan. 39 22-Jul-26 Planning Commission PAMC 15.22.080 — Viewshed enhancement Requested consistency between the viewshed-enhancement provisions and related definitions or standards applicable to geologically hazardous areas, ravines, and bluffs. Specific requirements for viewshed enhancement in geologically hazardous areas (previously referred to as marine bluffs and ravines) are explained under 15.22.410.D. They are very similar but vary slightly from the provisions established in 15.22.080.A.4.h only because viewshed enhancements in geologically hazardous areas must also ensure the trimming will not lead to increased bluff instability. 40 22-Jul-26 Planning Commission PAMC 15.22.080 — Tree replacement Asked for clarification of the two-to-one replacement requirement for removed trees or vegetation and how the requirement applies within critical areas. If trees are removed in a critical area or buffer, whether permitted or not, they must be replaced at a 2:1 ratio (two new trees for each tree removed). This only applies to the critical areas provisions of this chapter. 41 22-Jul-26 Planning Commission Tree replacement; Off-site mitigation Asked whether required tree replacement or mitigation may occur on another parcel owned by the same applicant and how that relates to future mitigation-banking provisions. Ideally, replacement trees should be installed adjacent to or near the location where trees were previously removed to mitigate for the lost functions and values of those trees in that particular location. If that isn't possible or there is a more suitable location for replacement trees, the Director may approve a subistitute location for plantings. 42 22-Jul-26 Planning Commission PAMC 15.22.090 — Critical- area review Asked whether a property containing a critical area automatically triggers Type II review when the proposed development is located outside the critical area and buffer. Not necessarily. If during the development review staff determine that the proposed development will not have an impact on critical areas or their buffers, the applicant will not need to undergo a full Type II permit review. The applicant must demonstrate to staff the location of all proposed improvements in relation to any critical areas on or within 300-feet of the subject parcel on a site plan with the building permit for staff to adequately determine whether critical areas review will be triggered. 43 22-Jul-26 Planning Commission PAMC 15.22.090 — Review procedure Requested that the site-reconnaissance and review pathway shown during the presentation be incorporated or more clearly described in the code so property owners can understand when additional critical-area review is required. Staff have added additional language to 15.22.110.B.1 to indicate that if during site reconnaissance it is determined that the proposed development is unlikely to impact a critical area or its buffer, additional reporting may not be required. 44 22-Jul-26 Planning Commission PAMC 15.22.090 — Drafting corrections Identified several drafting and formatting issues, including a cross-reference punctuation error, “beset” rather than “best,” incomplete wording, and indentation of stream-crossing provisions. Comment acknowledged and addressed all formatting and spelling errors. 45 22-Jul-26 Planning Commission PAMC 15.22.100 — Reasonable-use exception Asked who determines what constitutes “reasonable use” for purposes of a reasonable-use exception. Due to the difficult nature of determining what a reasonable use is, these decisions are left to the Hearing Examiner to either approve or deny. Attachment 3 10November 4, 2026 G - 74 46 22-Jul-26 Planning Commission PAMC 15.22.100 — Public notice and participation Asked whether the public receives notice and an opportunity to comment or participate when a reasonable-use exception or other critical-area permit may allow impacts to a critical area. Yes. As reasonbale use development applications are processed as a Type III permit, they are publicly noticed and open to a public comment period. 47 22-Jul-26 Planning Commission PAMC 15.22.100 — Construction feasibility and proportionality Raised concern that requiring the “best available” construction, design, and development techniques could be interpreted without a reasonable cost or feasibility limit or as an unlimited requirement for the most expensive construction available. This is required "to the maximum extent possible" meaning that any development that is proposed as a reasonable use must use the best available construction, design, and development techniques to the best of the proponent's abilities, rather than being explicitly required. 48 22-Jul-26 Planning Commission PAMC 15.22.100 — Meaning of construction standard Requested clarification that the provision concerns appropriate construction techniques rather than the quality or price tier of the building. Yes, this provision is referring to the actual construction techniques. 49 22-Jul-26 Planning Commission PAMC 15.22.100 — Cross- reference Identified a potential incorrect internal code cross-reference within the reasonable-use provisions and requested correction. Acknowledged and corrected. 50 22-Jul-26 Planning Commission Critical-area tracts; Ownership and taxation Asked whether creation of a critical-area tract creates a separate tax parcel and raised concern regarding continuing property-tax obligations for land that may not be developable. Critical area tracts would not turn into a spearate tax parcel. They would remain with the existing tax parcel and simply go on title as being a recorded critical area, such as when wetland boundaries are shown on plats for development. 51 22-Jul-26 Planning Commission Critical-area tracts; Maintenance responsibility Asked who is responsible for maintaining a critical-area tract or easement, particularly where an adjacent property owner did not create the tract. All owners of lots adjoining separate critical area tracts are responsible for the maintenance and protection of the tracts. Maintenance of these areas consists primarily of ensuring the tract remains undisturbed. 52 22-Jul-26 Planning Commission Critical-area tracts; Boundary markers Expressed concern that neighboring property owners could inadvertently enter, mow, or otherwise disturb a critical-area tract if its boundaries are unclear; requested confirmation regarding permanent fencing, signage, or other boundary marking. While it is possible that adjacent property owners may unintentionally mow or otherwise disturb a critical area tract, the permanent installation of fencing and signage will help reduce the chances of this happening. These provisions are established in 15.22.150.B and 15.22.160. 53 22-Jul-26 Planning Commission Exemption versus exception nomenclature and permit type Asked why the permit report listed critical-area exemptions as Type I when the earlier discussion appeared to place critical-area exceptions in Type III, and asked what “critical area exemptions” means. This goes back to the current improper use of the term "exception" in existing regulation. Critical area exemptions are different than exceptions. Exemptions are those activities or uses that only meet the criteria provided in 15.22.070. These are activities or uses that will not impact a critical area due to either the nature of the activity, or the fact that it takes place in a portion of a critical area or buffer that has previously been reviewed under the CAO. Examples include passive outdoor activities, trail maintenance, and landscape and garden maintenance. Exceptions are defined as either a reasonable use exception or critical area variance and require full critical area review. 54 26-Aug-26 Planning Commission Wetland buffers, Comprehensive Plan, and land capacity Asked how the wetland-buffer options related to the Comprehensive Plan and what effect each option would have on buildable land and lot capacity. A thorough analysis of the CAO and the Comprehensive Plan can be found in the staff analysis. To sumarize, the comprehensive plan has many goals and policies identified to establish a land use pattern that is consistent with the community's vision while also protecting and enhancing our area's unique natural features and overall environment. Wetland buffers will vary depending on the option selected; however, buffer alternative 3 as proposed provides the most flexibility when it comes to single and multi-family developments adjacent to wetlands, and may even provide more buildable land than current regulations allow. 55 26-Aug-26 Planning Commission Land-capacity analysis assumptions Asked whether the Comprehensive Plan land-capacity analysis used existing wetland buffers.The Land Capacity Analysis map that was developed for the Comprehensive Plan Periodic update used existing wetland delineations from multiple sources including the City's own wetland GIS database, WDFW priority habitats and species, and the national wetland inventory. 56 26-Aug-26 Planning Commission Current critical-area map Asked whether a map showed the City's current critical areas.The City's current GIS map shows some, not all, of the delineated critical areas including wetlands. Updating these maps will be a critical component of the implementation phase of this project. Attachment 3 11November 4, 2026 G - 75 57 26-Aug-26 Planning Commission Land capacity, clarity, and development cost Expressed concern that, although option 3 was flexible, it could be too complex for an ordinary landowner to understand without a professional and could cause some land to be treated as effectively unbuildable. Regardless of the wetland buffer alternative selected, all wetland reporting must be done by a qualified professional. 58 26-Aug-26 Planning Commission Required wetland professional Asked whether any buffer option would allow a landowner to avoid hiring a qualified professional. No. If a landowner wants to develop on a parcel that is adjacent to wetlands or their buffers, all reporting must be done by a qualified professional, regardless of the buffer alternative selected. 59 26-Aug-26 Planning Commission WAC 365-195-915 and departure from BAS recommendation Asked whether the WAC provision allowing documented legal, social, cultural, economic, and political considerations, including a justified departure from a scientific recommendation, had been considered. Any departure from WAC 365-195-915 must have a valid scientific reason listed on the record that justifies a different policy choice. Reasons that have been accepted in past cases include a documented need for essential public facilities, emergency access or public safety, protection of Tribal cultural resources, or conflicts with other legal obligations. Reasons that departures have been rejected include, assertions that longstanding buffers have reasonably performed, unsupported speculations on outcomes, selecting weaker science to achieve a desired outcome, and using scientific uncertainty to justify weaker protections. The city does not currently have the capcity to develop a valid scientific reason for deviating from the requirements of RCW 36.70A.172 and will utilize the best available science provided by state and federal agencies during this update. 60 26-Aug-26 Planning Commission Currency of Ecology wetland guidance Asked whether the Department of Ecology's 2022 ready-to-go options had been considered and how they differed from the cited 2018 material. The City has been utilizing the 2022 Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates while drafting these amendments. Within the 2022 document, under the Wetland Buffer Options, the July 2018 modified appendix is referenced as providing further clarification and detail on the three wetland buffer alternatives. So, even though the 2018 recommendations predate the 2022 guidance document, Ecology still recognizes those alternatives as the best available science. 61 26-Aug-26 Planning Commission Existing development within expanded buffers Asked how an existing approved development or structure would be treated if a newly enlarged buffer encompassed it. Previously approved developments that may be encompassed by a larger buffer under the new regulations may continue to exists as a pre-existing non- conforming situation as established in PAMC 17.95. Further provisions for these situations is established in 15.22.060.C. 62 26-Aug-26 Planning Commission Rebuilding a destroyed nonconforming structure Asked whether a nonconforming structure within a new buffer could be rebuilt in the same location if it was destroyed by fire. Yes. As set forth in 15.22.060.C.4, restoration or replacement of a structure that is damaged by fire or other natural disaster is allowed provided that a complete application for replacement is submitted within one year of the damage and the restoration or replacement is made to conform to the current critical areas regulations. If such regulations cannot be physically met without reducing the size of the strucutre, the restoration or replacement may not intesify any nonconformity that existed prior to the damage. 63 26-Aug-26 Planning Commission Unmapped wetlands and delineation trigger Asked whether a vacant parcel with no wetland shown on City maps would need to undergo wetland delineation during development review. A vacant lot may or may not contain wetlands - the burden of proof lies with the applicant on demonstrating whether critical areas are present. If during development review staff are led to believe wetlands may exist on the property due to soil type, aerial imagery, etc., it may delay the building permit process to have a wetland analysis performed. It is in the applicant's best interest to do their due diligence and have a site reconnaissance performed prior to submitting a building permit for review to indicate whether critical areas are or are not present. 64 26-Aug-26 Planning Commission Wetland use-intensity categories Asked whether the proposed system added a moderate-intensity category to the existing low- and high-intensity categories. Yes. The proposed wetland buffer alternative will add a monderate-intensity category to the existing low- and high-intensity categories. 65 26-Aug-26 Planning Commission Preferred wetland-buffer alternative Expressed support for buffer alternative 3.Comment acknowledged. Attachment 3 12November 4, 2026 G - 76 66 26-Aug-26 Planning Commission Flexibility versus public clarity Noted that alternative 3 created a tradeoff because it was more flexible but less transparent to a landowner without professional assistance. Regardless of the wetland buffer alternative selected, all wetland reporting and delineations must be done by a qualified professional. 67 26-Aug-26 Planning Commission Local flexibility and artificial wetlands Recommended using available WAC flexibility where justified, including for wetlands unintentionally created by road construction, while continuing to protect natural resources. The definition of wetlands excludes those that were unintentionally created after July 1, 1990 as a result of the construction of a road, street, or highway. As such, protection standards for wetlands that have been created in that manner do not apply. 68 26-Aug-26 Planning Commission Hybrid wetland-buffer alternative Asked whether the City could create a hybrid of options 2 and 3 by using a clear default buffer and requiring professional analysis only to reduce it. The City currently lacks the capcity to develop their own wetland buffer alternative at this time. If future direction is given to explore this further, staff would be happy to. 69 26-Aug-26 Planning Commission Timing of buffer-option decision Requested that the vote be delayed until staff reviewed the cited 2022 options and the Commission understood the complete range of choices. The City has been utilizing the 2022 Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates while drafting these amendments. Within the 2022 document, under the Wetland Buffer Options, the July 2018 modified appendix is referenced as providing further clarification and detail on the three wetland buffer alternatives. So, even though the 2018 recommendations predate the 2022 guidance document, Ecology still recognizes those alternatives as the best available science. 70 26-Aug-26 Planning Commission Maximum buffer and delineation currency Asked whether a buyer could identify the maximum possible buffer from the charts and then obtain a smaller buffer based on site conditions, and how long a prior delineation would remain usable. The maximum buffer size will easily be identified through the charts in 15.22.240. 71 26-Aug-26 Planning Commission Use of current BAS Expressed support for option 3 only if the City confirmed that the recommendation used the current 2022 guidance rather than relying on older material. The City has been utilizing the 2022 Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates while drafting these amendments. Within the 2022 document, under the Wetland Buffer Options, the July 2018 modified appendix is referenced as providing further clarification and detail on the three wetland buffer alternatives. So, even though the 2018 recommendations predate the 2022 guidance document, Ecology still recognizes those alternatives as the best available science. 72 26-Aug-26 Planning Commission Planning Commission recommendation on wetland buffers Recommended buffer alternative 3 with consideration of the exceptions or departure factors in WAC 365-195-915. Any departure from WAC 365-195-915 must have a valid scientific reason listed on the record that justifies a different policy choice. Reasons that have been accepted in past cases include a documented need for essential public facilities, emergency access or public safety, protection of Tribal cultural resources, or conflicts with other legal obligations. Reasons that departures have been rejected include, assertions that longstanding buffers have reasonably performed, unsupported speculations on outcomes, selecting weaker science to achieve a desired outcome, and using scientific uncertainty to justify weaker protections. The city does not currently have the capcity to develop a valid scientific reason for deviating from the requirements of RCW 36.70A.172 and will utilize the best available science provided by state and federal agencies during this update. 73 26-Aug-26 Planning Commission Article III wetlands review scope Asked whether the Commission had reviewed the proposed Article III wetland ordinance section by section rather than only the buffer options. Article III was reviewed at the August 26th PC meeting. 74 26-Aug-26 Planning Commission Historic flood-damage evidence Asked whether the City had data on buildings lost to flooding during approximately the last century to inform the frequently flooded-area standards. Staff have not been able to locate any records of this data at this time. 75 26-Aug-26 Planning Commission Geologic-hazard buffer width Commented that increasing the ravine or marine-bluff setback from 25 feet to 50 feet appeared reasonable for safety. Comment acknowledged. 76 26-Aug-26 Planning Commission Unauthorized stream- corridor impacts and penalties Asked where enforcement or penalties for unauthorized environmental damage in stream corridors would be addressed. Section 15.22.190 addresses all unauthorized critical areas impacts, including damage to stream corridors. Attachment 3 13November 4, 2026 G - 77 77 26-Aug-26 Planning Commission SPTH buffer measurement point Asked whether the riparian buffer was measured from a tree, the outermost tree, the stream center, or another point. Riparian management zone is measured from one of the following features (whichever is the farthest from the center of the watercourse): the ordinary high-water mark, the top of the stream bank, or the edge of the channel migration zone if one exists. 78 26-Aug-26 Planning Commission Piped watercourse applicability Asked whether the riparian-buffer standard applied where a creek was piped beneath developed property. No. Piped watercourses are not subject to the riparian buffer standards; however, if they are to be daylit then they would be subject to the applicable buffer standards. 79 26-Aug-26 Planning Commission Ordinary high-water mark versus top of bank Asked whether 'bank' in the ordinary-high-water-mark or top-of-bank standard meant the stream bank or the top of the ravine and requested clearer wording. "Bank" refers to top of the stream bank. This has been updated for clarity. 80 26-Aug-26 Planning Commission Planning Commission review of final critical-area map Asked whether the final critical-area map would return to the Planning Commission for review because the ordinance referenced the map. Once implementation takes place and the GIS mapping has been integrated, staff can bring the mapping tool back to the Planning Commission for review. 81 26-Aug-26 Planning Commission Scientific expert versus qualified professional Asked why 'professional' was replaced with 'scientific expert' without defining scientific expert and whether the two definitions should be reconciled. The definition for qualified professional has been amended and no longer contains "scientific expert". 82 26-Aug-26 Planning Commission Wetland delineation manuals and supplements Asked whether the regional supplements to the federal wetland delineation manual were federal, state, or locally developed. Regional suplements are developed by the US Army Corps of Engineers in partnership with state agencies. 83 26-Aug-26 Planning Commission Evidence when no wetland is found Asked whether an applicant would still need to submit documentation to the City if no wetland existed. The burden of proof is on the applicant to deomnstrate the presence or absence of wetlands during development review. If no wetlands are present on a parcel to be developed, the applicant should be able to demonstrate that through either site plans or a site feasibility assessment when submitting building plans for review. 84 26-Aug-26 Planning Commission Wetland-article numbering and agriculture wording Identified missing or misaligned item numbers and requested that the allowed-agriculture clause be revised so it did not say activities 'do not minimize adverse impacts,' using language such as no new or expanded adverse impacts instead. Comments acknowledged and addressed. 85 26-Aug-26 Planning Commission Placeholder table citations Asked whether citations shown as Table 15.22.XXX were temporary placeholders.Yes, table numbers will be updated prior to final adoption. 86 26-Aug-26 Planning Commission Final map review Requested that the finalized critical-area map return to the Planning Commission for review.Comment acknowledged. 87 26-Aug-26 Planning Commission Legal/scientific basis for future aquifer regulation Asked about the legal and scientific basis for restricting land in an aquifer solely because it might become a future potable-water source. Only specific uses and activities will be regulated in areas that are identified as a critical aquifer recharge area. This is to ensure groundwater protection from contaminants that are already regulated by the fire department, should the City choose to utilize aquifers as a source of potable water in the future. The City's legal department is currently reviewing the CAO. 88 26-Aug-26 Planning Commission CARA hazardous-material criterion connector Asked whether the two hazardous-material criteria should be joined by 'or' or 'and/or' rather than requiring both. Comment acknowledged and addressed. 89 26-Aug-26 Planning Commission Underlying zoning in CARAs Asked whether designation as a critical aquifer recharge area changed the underlying zoning or permitted uses. The underlying zoning will not be changed, however, permitted uses may need to be updated to ensure consitency, specifically with activities that result from specific commercial, industrial, and home occupation uses that process and handle regulated materials and/or store regulated materials. 90 26-Aug-26 Planning Commission Incomplete CARA subsection Asked whether the still-undrafted subsection would return to the Commission once completed.This subsection will be addressed during the public hearing on September 23rd. 91 26-Aug-26 Planning Commission CARA report scope for minor expansion Asked how much critical-area reporting would be required for a simple home or business addition that did not change the use or contamination potential. If the use or contamination potential of an existing home occupation or business is not changing, an applicant would state that information on their development application for staff to review. No further reporting would be required if they are compliant with the regulations established in Article IV. 92 26-Aug-26 Planning Commission Open-ended information requirement Asked what 'other information as required by the City' could include and whether that standard was too vague. Comment acknowledged and amended. 93 26-Aug-26 Planning Commission Frequently flooded-area drafting gaps Requested restoration of the missing subsection D and fuller text in subsection E on alteration of watercourses. Comments acknowledged and addressed. Attachment 3 14November 4, 2026 G - 78 94 26-Aug-26 Planning Commission Habitat-area map Asked whether the referenced habitat-area map existed or would be created.The habitat are map is something that will need to be prepared by the qualified professional responsible for preparing the habitat management plan. The map should show the general location of the affected habitats in relation to the proposed development, similar to that of what is prepared on a site plan for other types of development proposals. 95 26-Aug-26 Planning Commission Map establishment and maintenance Recommended that the code explicitly require critical-area maps to be created and kept current.Comments acknowledged and addressed. 96 26-Aug-26 Planning Commission Increase from 25-foot to 50- foot geologic-hazard buffer Asked whether the provision increased a ravine setback from 25 feet to 50 feet and whether it also applied to bluff-side structures within shoreline jurisdiction. Yes, because the existing 'ravine' designation will now be defined as a geologically hazardous area, they will be subject to a 50-foot setback as opposed to a 25-foot setback. This is also consistent with the vegetation conservation area of the shoreline jurisdiction. The city will be updating their Shoreline Master Program in the coming years for consistency where needed. 97 26-Aug-26 Planning Commission Tree-removal prohibition and 2:1 replacement Asked why the provision prohibited felling, topping, or removal and then required 2:1 replacement when trees were felled. This requirement is established in situations where violations of the regulation occur. If there is not path to compliance established, it is difficult to enfore noncompliance with regulation. 98 26-Aug-26 Planning Commission Intentional violation and enforcement sufficiency Asked whether applying for a permit and planting two smaller trees was the only consequence if an owner intentionally removed a tree to improve a view. In addition to permitting and vegetation replacement, any individual out of compliance with regulation would also be subject to daily fees once a violation is established through code enforcement. 99 26-Aug-26 Planning Commission Viewshed permit applicability Asked whether the viewshed-enhancement process applied only to new development or also to an existing owner who later wanted to improve a view. Establishing a viewshed corridor is part of a development standard, meaning that it may be done with new development; however, vegetation management including viewshed enhancement is an allowed use per section 15.22.080 so existing developments may apply for this use pursuant to the criteria established. 100 26-Aug-26 Planning Commission Reuse and expiration of arborist/mitigation reports Asked how long an approved arborist or mitigation report could be reused for recurring pruning without paying for a new professional report. Existing reports expire after five years or possibly sooner if the best available science and best management practices for the particular use or activity are updated. 101 26-Aug-26 Planning Commission Geologic-hazard title notice/indemnification Expressed concern that the broad title notice and indemnification requirement could affect financing, insurance, and resale, and recommended legal review and consideration of recording the notice only after development in the hazard area was approved. Comment acknolwedged. Modified language to "Upon permit issuance" rather than "prior to permit issuance". This draft is currently under review by the City's legal department. 102 26-Aug-26 Planning Commission Species and habitats of local importance Asked how the City would determine which species and habitats were locally important.Utilizing the WDFW priority habitats and species list, the City will coordinate with local natural resource professionals and the Lower Elwha Klallam Tribe to establish a list of locally important species and habitats. 103 26-Aug-26 Planning Commission RMZ classification as FWHCA Asked whether riparian management zones were fish and wildlife habitat conservation areas and whether RMZs should be expressly listed. Yes, riparian management zones are a specific type of fish and wildlife habtiat conservation area. They are expressly listed because of the extensive regulations from the Department of Fish and Wildlife for protection standards of anadromous fisheries. 104 26-Aug-26 Planning Commission Ground-truthing site- potential tree height map Asked whether field evidence could override the state SPTH map when the mapped dominant tree species did not match present conditions. The dominant tree species that is used is based on the NRCS soil type for a given location, not on the actual field-verified dominant tree species. It is the dominant species that a site could potentially support under the right growing conditions. 105 26-Aug-26 Planning Commission Piped watercourses Commented that the added treatment of piped watercourses was reasonable and helpful.Comment acknowledged. 106 26-Aug-26 Planning Commission RMZ typo Requested correction of the reference from 'EMZ' to 'RMZ.'Comment acknowledged and corrected. 107 23-Sep-26 Planning Commission Recharge-area maps and timing Asked when updated critical-area maps would be complete and returned to the Commission, and how the ordinance would operate in the meantime. Mapping is part of the implementation phase of this update. Once development regulation is approved, staff can work to incorporate the mapping sources cited in the regulation and will bring the maps to the committee for review. Attachment 3 15November 4, 2026 G - 79 108 23-Sep-26 Planning Commission Recharge areas and industrial uses Asked how proposed rules for critical aquifer recharge areas would affect future industrial and manufacturing uses in mapped waterfront locations.Future industrial and manufacturing uses in mapped waterfront locations may be permitted provided they have a hydrogeologic assesment of the proposed development that demonstrates no adverse impact to groundwater through mitigation measures and best management practices. 109 23-Sep-26 Planning Commission Maps with ordinance review Recommended that referenced maps be available to commissioners during future ordinance reviews to show the geographic reach and potential land-use effects.Comment acknowledged. 110 23-Sep-26 Planning Commission Access to existing maps Asked why commissioners could not see available maps during review; staff referred to maps presented at a prior meeting. Mapping is part of the implementation phase of this update. Once development regulation is approved, staff can work to incorporate the mapping sources cited in the regulation and will bring the maps to the committee for review. 111 23-Sep-26 Planning Commission Fuel stations and future waterfront use Raised concern about how mapped recharge areas might affect new fuel stations, port parcels, and future industrial use along Marine Drive.Any proposed use that is within a critical aquifer recharge area that has the potential to impact groundwater will need a hydrogeologic assessment and mitigation report to be prepared . So long as they are able to meet the requirements of the chapter, the activities would be approved. 112 23-Sep-26 Planning Commission City-owned pruning policy Asked about the City’s approval process, timing, and cost for pruning on City-owned bluff land. At this time, the city is evaluating it's tree management standards and will be developing an Urban Forest Management Plan to address these decisions. 113 23-Sep-26 Planning Commission Pruning on private bluff property Asked whether a property owner who owns bluff land may seek approval to prune trees there. Yes, so long as the land where the work is to be done is owned by the individual requesting the work, they may continue to apply for a permit to do so provided they continue to meet the provisions of the chapter. 114 23-Sep-26 Planning Commission Work outside a public right of way Asked what process a private person can use to request vegetation work on City land outside a right of way.At this time, the city is evaluating it's tree management standards and will be developing an Urban Forest Management Plan to address these decisions. 115 23-Sep-26 Planning Commission City-property discussion and evaluation date Asked where residents can discuss incomplete applications and when the City’s tree- management evaluation would conclude.Comment acknowledged. 116 23-Sep-26 Planning Commission General pruning and hazard- area provisions Asked whether the general non-destructive-pruning allowance conflicts with the separate view- enhancement provision for landslide and erosion hazard areas. No - regardless of where the trees are located, all purning that is allowed under the CAO must be non-destructive in nature and may not adversely affect tree health and vigor. 117 23-Sep-26 Planning Commission Recurring exemption permits Asked whether a previously approved arborist report or permit could support recurring trimming without repeated professional expense.Yes. Staff have added regulation to reflect this under 15.2.080.D.8.d. 118 23-Sep-26 Planning Commission Hobby-farm intensity listing Noted that hobby farms appeared in both high- and moderate-intensity land-use lists. Corrected to remove hobby farms from high-intensity uses. 119 23-Sep-26 Planning Commission Duplicate code lettering Identified duplicate lettering in the draft critical-area code. 120 23-Sep-26 Planning Commission Wetland-buffer motion and WAC exceptions Asked whether the draft implemented the prior Commission motion on wetland buffer option three and WAC exceptions. The draft implements the selection of buffer option 3, however, staff do not have the capacity to consider exceptions from the best available science at this time. That would require extensive time and dedication to come up with a valid scienctific method of our own that strays from the provided best available science. 121 23-Sep-26 Planning Commission Recurring-maintenance motion Moved to have staff explore an initial report and permit that would authorize regular maintenance without repeated professional costs. Staff added regulation for annual maintenance once an initial report or plan has been provided. See 15.22.080.D.8.d 122 23-Sep-26 Planning Commission Recommendation and maps motion Moved to recommend approval of the amendment provided that the referenced maps return to the Commission for review.Comment acknowledged. Attachment 3 16November 4, 2026 G - 80 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 1 25-Aug-26 City Council Review process and access to presentation Requested the slide deck and noted that the engagement questions required more review time, with additional written feedback to follow. Comment acknowledged. 2 25-Aug-26 City Council Article I decision authority Asked which director would make the decision referenced in Article I and slide 20.The Community and Economic Development Director. 3 25-Aug-26 City Council Compensatory mitigation Asked whether compensatory mitigation meant a monetary payment in lieu of impacts and what other forms it could take. Fee-in-lieu of is one form of compensatory mitigation. Additional mitigation measures include restoration (both re-establishment and rehabilitation), establishment, protection (preservation), or a combination of enhancement and protection. 4 25-Aug-26 City Council Location of mitigation requirements Asked whether compensatory-mitigation options and requirements would be included in the code or the planned handbook. Yes, they will be established in code under section 15.22.260. 5 25-Aug-26 City Council Unauthorized camping and enforcement Asked whether the unauthorized-use and enforcement provisions would apply to people living or camping outdoors in critical areas. Because camping is not an authorized use of the underlying zone of critical areas, such as public building and parks, any unauthorized living or camping within critical areas would be subject to enforcement provisions of PAMC. 6 25-Aug-26 City Council Critical aquifer recharge area mapping Asked whether critical aquifer recharge areas were present in Port Angeles and where they were located. Yes, several CARAs exist within City Limits. Their locations will be identified through the implementation phase of this update when GIS maps are updated to reflect the adopted ordinance. The County has a current CARA map that can be referenced at this time. 7 25-Aug-26 City Council Tree management, retention, and viewsheds Asked what tree management and tree retention meant in the update.For the CAO, tree management will be limited to hazard tree removals and pruning for tree maintenance and viewshed purposes only. Additional tree retention and management practices will be established at a later time with the Urban Forest chapter and Urban Forest Management Plan. 8 25-Aug-26 City Council Cautious uses and encampments Requested robust future discussion of activities and uses requiring greater caution, particularly where the policy intersected with homelessness and encampments. Comment acknowledged. 9 25-Aug-26 City Council Critical aquifer recharge area protection Recommended proactive protection of potential future water sources because drought and low water levels increased their importance. Comment acknowledged. 10 25-Aug-26 City Council Restoration leadership Recommended that the City take a more active role in restoring degraded critical areas while partnering with willing community organizations. Comment acknowledged. 11 25-Aug-26 City Council Viewshed enhancement and enforcement Recommended giving watershed protection, shade, and salmon habitat greater weight than viewshed enhancement through an enforceable process coordinated across code enforcement and police capacity. Vegetation removal or pruning must be done in a manner that minimizes disturbance and prevents adverse effects on soil stability, fish and wildlife habitat, water quality, or water quantity. If an applicant cannot demonstrate these requirements through the permit process, a permit will not be approved. 12 25-Aug-26 City Council Interconnected stream and shoreline systems Noted that the City's five stream and riparian corridors connected toward Olympic National Park and that upstream and downstream actions affected neighboring jurisdictions and required coordination. Comment acknowledged. Strong protection standards for riparian and wildlife corridors must be established between adjacent agencies, including the County, US Forest Service, DNR, and Olympic National Park. 13 25-Aug-26 City Council Existing urban footprint and buffers Noted that homes, industry, and parks already existed near critical areas and recommended strong setbacks and buffers rather than blanket prohibitions. Setbacks and buffers are established for each of the five critical areas, based on the best available science and recommendations from the state agencies that govern the areas. Comments - City Council Attachment 3 17November 4, 2026 G - 81 14 25-Aug-26 City Council Tree-height setbacks and development limits Recommended that potential mature tree height inform development setbacks and that the City deny development on some sites rather than grant an exception. The City cannot legally deny all reasonable use of a property due to the presence of critical areas. There is a legal obligation to allow for a reasonable use exception. If the city is interested in denying future development on parcels of land that are completely encumbered by critical areas, direction should be given to explore a buy-back program of sorts to purchase parcels of interest. 15 25-Aug-26 City Council Conservation acquisition Recommended working with state legislators on a buyback program to acquire parcels unsuitable for development and protect them permanently through conservation easements. Comment and acknowledged. 16 25-Aug-26 City Council Hazardous materials Recommended greater scrutiny of uses involving oil, gasoline, diesel, and similar hard-to-clean contaminants near critical areas. Comment acknolwedged. This is addressed in Article IV, critical aquifer recharge areas. 17 25-Aug-26 City Council Roadways, traffic, and stormwater Recommended accounting for traffic and road impacts, including tire-related contaminants and stormwater treatment before runoff reached critical areas. Comment acknowledged. Updates to the City's stormwater regulations would best address treatment prior to runoff. Additionally, maintaining adequate, healthy vegetation buffers along our stream corridors assists with polutant filtering. 18 25-Aug-26 City Council Public GIS mapping Requested robust public GIS layers showing wetlands, critical areas, wellhead-protection areas, and aquifers rather than limiting those maps to internal use. Mapping tools are available for both internal and external users. The City maintains a public-facing GIS portal that will be updated with new critical area layers during the implementation phase. 19 25-Aug-26 City Council Applicant-funded technical reports Expressed concern that applicant-hired technical reports could create bias and recommended independent third-party review focused on objective environmental analysis. 15.22.170 allows the Director of Community and Economic Development to engage in third-party review of critical area reports, if during review,it is determined that additional external review is warranted. 20 25-Aug-26 City Council Emergency shoreline permits and interagency notice Requested prompt, reliable notice to the City and follow-through for emergency shoreline or erosion permits issued by state agencies, including during lengthy finalization periods and ownership changes. Shoreline permitting and timelines will be addressed during the periodic update to the City's shoreline master program. 21 25-Aug-26 City Council Aquifer protection and source switching Recommended fully protecting aquifers and evaluating them as a future source-switching or supplemental-water option when Elwha River flows were low. Comment acknowledged. 22 25-Aug-26 City Council Tree-canopy benefits Noted that tree retention supported carbon sequestration and neighborhood cooling.Comment acknowledged. 23 25-Aug-26 City Council Priority restoration sites and staffing Recommended active restoration of degraded locations such as the former mill site, Valley Creek, and the lagoon, supported by additional natural-resources staffing and field capacity. Comment acknowledged. 24 25-Aug-26 City Council Enforcement capacity Identified the need for additional enforcement capacity if the ordinance were expected to address unauthorized camping and other critical-area violations. Comment acknowledged. 25 25-Aug-26 City Council Airport trees Asked whether no-topping or tree-felling restrictions would apply to City-owned trees near the airport. The trees at the airport are located outside of a critical area, as such, the regulations under this chapter would not apply. However, during the urban forestry chapter development, best management practices will be established for all other trees on city-owned property, including trees at Lincoln Park near the airport. 26 25-Aug-26 City Council Waterfront District viewshed work Asked whether the amendments would make the Waterfront District's effort to open the view behind the waterfront hotel more difficult. Proposed amendments would not make the existing project for viewshed enhancement behind the Red Lion Motel - the viewshed enhancement provisions are only being modified slightly from current regulation to ensure best management practices are up to date. 27 25-Aug-26 City Council Time to review engagement questions Commented that the eight policy questions should have been available earlier and noted that more considered written feedback would follow review of the emailed deck. Comment acknowledged. 28 25-Aug-26 City Council Reuse of County aquifer mapping Asked whether the City could use the existing County aquifer map for its public GIS without commissioning new survey work. Yes, the city can adopt by reference the existing County map showing the location of the critical aquifer recharge areas. Attachment 3 18November 4, 2026 G - 82 29 25-Aug-26 City Council Restoration leadership Recommended that the City take a large, visible leadership role in restoring degraded critical areas. Comment acknowledged. Staff will await future guidance from leadership in these efforts. 30 25-Aug-26 City Council Code-enforcement staffing Asked whether the City currently had two code-enforcement officers.Confirmed. 31 25-Aug-26 City Council Comprehensive critical-area mapping Requested visual maps of stream corridors, including buried streams beneath roads, shorelines, ravines, and aquifers, to show where policy would apply and support defensible decisions. Comment acknowledged - mapping will be updated during the implementation phase of this project upon Council adoption. 32 25-Aug-26 City Council Development on fill and climate risk Asked how the ordinance or related plans would address downtown and other shoreline areas built on fill when considering climate-change and shoreline risk. These issues will be further addressed during the City's periodic review of the Shoreline Master Program. Greater scrutiny may be required when considering factors such as sea level rise and earthquake and tsunami hazards, given the location and extent of the known geologically hazardous areas associated with downtown. 33 25-Aug-26 City Council Net ecological gain and public review Recommended revisiting net ecological gain, providing a clear opportunity for public discussion, and incorporating public comments on standards grounded in best available science. Per the goals and policies of the recently updated comprehensive plan, the critical areas ordinance will strive for net gain of ecological functions and values while also maintaining no-net-loss as the currently accepted best available science from the Department of Fish and Wildlife's guidance documents. Additionally, various state agencies, including WDFW, are currently reviewing the draft CAO for meeting statutory requirements. The public is invited to review and comment during the Public Hearing on September 23rd. 34 25-Aug-26 City Council Variance standards and consistent enforcement Recommended a specific, transparent variance and enforcement process that avoided selective treatment based on complaints, wealth, business influence, or ability to navigate the Variances are established in 15.22.100. 35 25-Aug-26 City Council Kelp, eelgrass, anchoring, and harbor access Recommended protecting kelp and eelgrass from anchoring impacts, considering public mooring buoys or additional public dock space for smaller vessels, and evaluating harbor access equitably without prioritizing large business interests. Many of these management recommendations can be incorporated during the City's Shoreline Master Program periodic update. A no-anchor zone in kelp and eelgrass protection zones will be established. 36 25-Aug-26 City Council Aquifer protection and alternate supply Recommended protecting aquifers and water-storage capacity and evaluating alternate water sources in light of drought and regional watershed concerns. Comment acknowledged. 37 25-Aug-26 City Council Holistic tree-canopy management Recommended that tree policy recognize parcel interdependence, including shade and microclimate benefits supplied by neighboring trees, and manage the urban canopy holistically. Comments acknowledged and will be addressed through the development of the Urban Forestry Chapter and Urban Forest Management Plan. 38 25-Aug-26 City Council Equity between new and existing development Recommended avoiding inequitable treatment between new development and existing property owners while protecting critical areas and preserving reasonable buildability. Regardless of an individual's wealth, all proposed development on land that is within or adjacent to a critical area must adhere to the regulations established to protect the ecological functions and values of the critical area, and to ensure that any proposed use or development is safe for the individual or business interested in development. 39 25-Aug-26 City Council Bluff erosion, buffers, and existing development Recommended that the CAO address new and existing development on unstable marine bluffs, larger buffers, downstream safety impacts, taxpayer exposure, and consistent enforcement, with more detail in later presentations. Comments acknowledged. 40 25-Aug-26 City Council Code clarity and consistent administration Recommended updated definitions and clear standards to reduce inconsistent answers while preserving flexibility for project-specific circumstances. The defintions section of the chapter has been updated to reflect all current definitions and consolidated for ease of use. 41 25-Aug-26 City Council Comparable single-source water cities Asked how many comparable jurisdictions used in the code review also relied on a single water source. There are 11 sole source aquifers that are regulated under the EPA in Western Washington. Of the comparable jurisdictions used in this code review, three of them fall within the sole source aquifer mapped locations established under the EPA. Additional cities, such as Bellingham, rely on a single-source for drinking water that is not an aquifer, similar to Port Angele; however, they have chosen not to adopt any regulation for CARAs becuase they do not currently use aquifers as a source of potable water. Attachment 3 19November 4, 2026 G - 83 42 25-Aug-26 City Council Availability of qualified professionals Asked how many qualified professionals were locally available to prepare required reports and whether limited availability could make the ordinance impracticable. The County has a list of qualified professionals that they distribute to applicants who request it. They city can develop one of their own or refer to the County's list, if desired. 43 25-Aug-26 City Council Geographic scope and UGA Asked whether the ordinance would apply to the urban growth area, including the proposed boundary swap identified in the Comprehensive Plan. No, these regulations only apply to areas within City Limits. 44 25-Aug-26 City Council Aquifer protection and planned groundwater supply Noted that persistent drought and reduced snowpack increased the value of the planned groundwater project and expressed concern that contamination would undermine that future resource. Comment acknowledged. 45 25-Aug-26 City Council Agricultural uses in aquifer areas Recommended preserving opportunities for low-contaminant or biodynamic agriculture while distinguishing those activities from uses that could damage aquifers. Agricultural uses are defined as commercial agriculture and animal husbandry. Any other sort of hobby farming or otherwise "backyard" agricutlure would not be required to undergo critical area permit review. 46 25-Aug-26 City Council State-regulated forest- practice exemption Asked whether the exemption for forest practices regulated by the state meant that the state itself was broadly exempt from the CAO. No, forest practices that are regulated by the state are those that are reviewed under RCW 76.09. This does not provide the state a blanket exemption from the critical areas review. 47 25-Aug-26 City Council Bluff and shoreline erosion mechanisms Recommended distinguishing erosion driven by stormwater runoff and geologic instability from shoreline erosion driven by wave action while addressing both through the appropriate critical- area and stormwater tools. Stormwater management is regulated by the Public Works Department and thus, any amendments to the existing stormwater regulation must be developed by the appropriate department. CED will address bluff erosion and best management practices for stormwater runoff during the updates to the Shoreline Master Program. 48 25-Aug-26 City Council Nearshore trails and public access Recommended retaining existing downtown trails while considering over-water redesign as an immersive path that could improve public access and reduce nearshore impacts. This can be addressed during the updates to the Shoreline Master Program. 49 25-Aug-26 City Council City-owned shoreline infrastructure and restoration Recommended that the City lead by protecting its own critical areas, relocating infrastructure where feasible, and advancing naturalized shoreline protection at Ediz Hook using large wood and native vegetation. This can be addressed during the updates to the Shoreline Master Program and with future guidance from Council. 50 25-Aug-26 City Council Environmentally responsible shoreline redevelopment Requested strong, usable CAO direction for environmentally responsible future development of the downtown nearshore and former mill property. The downtown nearshore and former mill property are primarily regulated under the Shoreline Master Program, and any additional direction for the future development of these areas will need to be provided during the updates the the SMP. 51 25-Aug-26 City Council Location of mitigation Recommended keeping mitigation within Port Angeles and preferably within the same watershed or riparian system rather than shifting ecological impacts elsewhere. This is addressed under mitigation requirements specific to wetlands in 15.22.260 and 15.22.520 for fish and wildlife habitat conservation areas. 52 25-Aug-26 City Council Follow-up timing and legislative schedule Recommended submitting written questions early enough for review and preserving the schedule between the Planning Commission hearing and Council first reading so revisions could be incorporated without a last-minute scramble. Staff will provide responses to questions as soon as possible after the completion of the Public Hearing. 53 25-Aug-26 City Council Mooring-program reference Identified Port Townsend and the Jefferson County Marine Resources Committee as references for boat-mooring approaches. Staff will look into these provisions when further establishing boat-mooring approaches during the SMP updates. 54 25-Aug-26 City Council Supported uses near critical areas Recommended supporting conservation and restoration, native vegetation and invasive-species work, stream, wetland, riparian, floodplain, fish-passage and habitat projects, low-impact recreation and education, environmental research and monitoring, and Indigenous stewardship practices. All of these uses or activities will be supported as either exempt or allowed uses established in 15.22.070 and 15.22.080. 55 25-Aug-26 City Council Uses requiring greater scrutiny Recommended greater scrutiny of intensive residential, commercial, industrial, roadway, parking, and recreation uses; grading, clearing, hazardous-material, impervious-surface, drainage-altering, groundwater-affecting, and mature-vegetation-removal activities; and directing intensive development away from critical areas and buffers where alternatives existed. These uses and activities will all be regulated as either Type II or Type III critical areas permits and must adhere to the requirements to be established herein. Attachment 3 20November 4, 2026 G - 84 56 25-Aug-26 City Council Buffers and indirect impacts Recommended treating buffers as part of the protection strategy because adjacent development could affect stormwater, sediment, temperature, groundwater, hydrology, wildlife movement, vegetation, noise, light, floodplain function, and salmon habitat. Buffers will always be considered as a required part of any proposed use or activity and are established within each applicable article. 57 25-Aug-26 City Council Wetland-protection factors Recommended that wetland policy consider ecological function and value, size, condition, type, connectivity, development impacts, buffers, best available science, climate change, public benefits, existing development, Tribal treaty rights and cultural resources, and restoration opportunities. These considerations are currently drafted under Article III - Wetlands. 58 25-Aug-26 City Council Critical aquifer recharge area controls Recommended prioritizing aquifer recharge protection and limiting activities that could contaminate groundwater, compact soils, create extensive impervious cover, alter drainage, or reduce infiltration. These considerations are currently drafted under Article IV - Critical Aquifer Recharge Areas. 59 25-Aug-26 City Council Managed recharge and supplemental water Recommended clean stormwater infiltration and, where feasible, managed aquifer recharge to support a protected aquifer, municipal well, treatment, and supplemental or emergency residential supply, subject to hydrogeologic, water-quality, regulatory, and water-rights analysis. Many of these recommendations will need to be incorporated into the City's Stormwater section of code, which is managed by the Public Works and Utilities Department. 60 25-Aug-26 City Council Private and public viewshed distinction Asked whether the CAO would distinguish private view enhancement from significant public scenic views and whether the two types of viewsheds should be identified separately. Separating private view enhancement from significant public views would be difficult to separate, as the parcels that contain trees and other vegetation are owned by various entities, including a mix of private and public ownership. Staff may consider separating the two with the addition of the Urban Forestry chapter, if capacity exists. 61 25-Aug-26 City Council Viewshed standards Recommended allowing viewshed enhancement only where it does not compromise critical- area functions and values, favoring selective pruning, thinning, and carefully designed view corridors over extensive vegetation removal, with greater protection where vegetation supports slope stability, habitat, shoreline, or other critical-area functions. These considerations are currently drafted under section 15.22.080.A.4.h and 15.22.410.D. 62 25-Aug-26 City Council City-led restoration and incentives Recommended City-led restoration of parks, rights-of-way, stormwater facilities, stream corridors, wetlands, and floodplains; prioritizing landscape-scale benefits; and offering landowners technical assistance, grants, permit help, recognition, and nonprofit partnerships. Comments acknowledged. Staff will await further guidance from leadership on these efforts. 63 25-Aug-26 City Council Natural-resource expert engagement Requested a natural-resources and nonprofit roundtable so restoration experts could review the draft CAO before the public-comment stage, complementing the builder roundtable. An external stakholder group consisting of various natural resource professionals has been meeting regularly through these updates. Their comments and quetsions are addressed within this matrix. 64 25-Aug-26 City Council Critical areas on private property Commented that private ownership should not exempt wetlands, streams, fish habitat, aquifer recharge areas, or other critical resources from CAO protection and recommended a local regulatory layer that respected lawful property rights. All landowners, regardless of type of ownership, are subject to the provisions of the critical areas protection standards. 65 25-Aug-26 City Council Equitable urban-tree retention Recommended protecting high-value mature, native, habitat, riparian, and shade trees; evaluating canopy at the neighborhood scale; allowing reasonable removal of dead, diseased, hazardous, poorly located, or unavoidable trees; and directing City investment toward areas with low canopy. Comments acknowledged. These issues and more will be addressed through the development of the Urban Forestry Chapter. 66 25-Aug-26 City Council Nonconforming structures Requested clarification of PAMC 15.22.060(C) so modification rights applied to a habitable existing structure and could not be used to remodel an uninhabitable structure while retaining nonconforming status. 15.22.060.C establishes regulation for existing structures that were outside of the previously established buffers, but with the new regulation, may be located within a critical area buffer. It provides a pathway for minor modifications of these lawfully established strucutres to occur, even if they are located in an area that would now be considered for full critical area review for a new development. Attachment 3 21November 4, 2026 G - 85 67 25-Aug-26 City Council Net ecological gain Recommended replacing or moving beyond no net loss toward net ecological gain because no- net-loss policy could shift rather than repair environmental impacts. Goals and policies in the recently adopted comprehensive plan indicate that critical areas regulations should strive for net ecological gain, but continue to meet no-net-loss of ecological functions and values. That said, wetland mitigation requirements give prefernce to re-establishment that results in a gain in wetland area and function, and fish and wildlife habitat conservation area mitigation must achieve equivalent or greater biologic and hydrologic functions. This regulation maintains a balance between what is feasible for local landowners while also striving for net gain when possible. 68 25-Aug-26 City Council Watershed-scale mitigation Recommended keeping water and mitigation benefits within the affected watershed and maintaining healthy riparian forests rather than shifting mitigation outside the local system. Comments acknowledged and are incorporated within mitigation standards. 69 25-Aug-26 City Council Restoration inventory and implementation capacity Recommended expanding restoration capacity and inventorying priority needs, including wildlife activity, Valley Creek, Ediz Hook, the former mill site and bluff toe, wetlands, aquifers, riparian habitat, pocket estuaries, the lagoon, culverts, fish passage, and invasive-species removal. Staff will await further guidance from Council on these efforts. 70 25-Aug-26 City Council Priority-parcel acquisition Recommended establishing a program to identify and acquire priority parcels within critical areas for permanent conservation. Staff will await further guidance from Council on these efforts. 71 25-Aug-26 City Council Interactive and current public GIS Requested an interactive public map with switchable critical-area and FEMA layers and the ability for natural-resource staff to add field observations and baseline changes so the information remained current. These mapping features will be incorporated into the public-facing GIS imagery during implementation. 72 25-Aug-26 City Council Clear and coordinated permitting Recommended clear, user-friendly requirements and applications, staff training, and coordination of local permits with state and federal permitting requirements. Internal training will be completed during implementation. Staff are always looking for ways to coordinate local permitting with state and federal requirements. 73 25-Aug-26 City Council Emergency permit coordination Recommended formalizing communication among the City, County, Tribes, and state agencies when emergency shoreline protection was authorized and tracking completion through permit finalization and ownership changes. This can be addressed during the updates the the Shoreline Master Program with further guidance from Council. 74 25-Aug-26 City Council Wetland regulatory hierarchy Requested a clear explanation of federal, state, and local wetland roles, including federal dredge-and-fill jurisdiction, state water-quality, shoreline and SEPA requirements, and local land-use, buffer, clearing, grading, and CAO controls. Cities are responsible for regulating wetlands at the local level, utilizing the guidance and oversight from the Department of Ecology and the US Army Corps of Engineers. Any Type II and above critical area permit will also trigger SEPA review, which is reviewed by Department of Ecology and other state agencies. The city has the ability to set buffer widths, local land use policies, clearing and grading regulations, and CAO requirements based on guidance from state and federal agencies. 75 25-Aug-26 City Council Property notice and parcel encumbrance Asked how the City would notify appraisers, assessors, owners, buyers, and real-estate professionals about development limits and whether parcels would be formally flagged or encumbered when critical areas were present. Through properly and readily available mapping tools, appraisers, owners, etc. will be able to easily identify whether a parcel is likely to contain 76 25-Aug-26 City Council Independent technical review Recommended an independent technical-review process in which the City defined the scope and selected or retained the reviewer, the applicant paid, conflict safeguards applied, peer review could be required, findings were transparent, and the City retained final decision authority. Section 15.22.170 established regulation for situations where the City may hire a third-party, independent review of development proposals at the expense of the applicant. 77 25-Aug-26 City Council Scope of environmental impact analysis Recommended continuing analysis beyond a consultant's conclusion of no impact by evaluating affected functions, magnitude, duration, reversibility, worst-case conditions, cumulative development, climate-change conditions, uncertainty, and the consequences of mitigation failure. If the city feels an applicant's analysis does not comply with the regulations of the CAO, additional information may be requested for further review. Similarily, the provisions of 15.22.170 may come into place should a situation of this nature arise. Attachment 3 22November 4, 2026 G - 86 78 25-Aug-26 City Council Tribal and resource-agency review Recommended a process to seek appropriate Tribal and resource-agency expertise for projects involving salmon, shorelines, habitat, cultural resources, or water quality without transferring the City's decision authority. Any project that involves SEPA or has the potential to impact a critical area or cultural resource is always routed to the appropriate Tribal and resource- agencies for their review and comment. Additionally, staff have added 15.22.025 - Tribal Consultation. 79 25-Aug-26 City Council Director authority to waive report sections Asked why the Director could exempt particular sections of a critical-area report under PAMC 15.22.110(B). If, after review, the Director has determined that a full critical areas report is not required, due to either the nature of the proposal or the lack of a critical area near the project location, certain portions of the report requirements may be exempt. This would only apply in limited situations and after a complete review of the development submittal. Another example may be if a proposed project will have no impact on a critical area, the Director may exempt the mitigation and monitoring components of the report. 80 25-Aug-26 City Council Critical-area report contents Recommended relabeling PAMC 15.22.110(B) as required report sections; including standard methodology, existing-condition, species, habitat, impact, water, ordinary-high-water-mark, geotechnical, and mitigation elements as applicable; and removing 'adversely' so all impacts were identified regardless of magnitude. 15.22.110.B has been relabeled as such to reduce confusion. Specific report requirements are established for each of the critical areas and contain items relevant to the applicable critical area. Adversely has been removed. 81 25-Aug-26 City Council Consultant conflicts and report assumptions Recommended requiring a consultant no-conflict-of-interest declaration and City approval of material report assumptions before a technical report was finalized. Comment acknowledged. This can be addressed when specific circumstances arise. 82 25-Aug-26 City Council Net ecological gain Recommended replacing the no-net-loss standard in PAMC 15.22.130 with net ecological gain.Staff have added the following: "or where feasible, enhancement of functions and values." 83 25-Aug-26 City Council Mitigation-completion encumbrance Recommended recording an encumbrance against the property until required mitigation was complete so the obligation survived a sale and the public investment was protected. This suggestion can be added as a condition to any permit during the permit review and issuance. Failure to comply with the mitigation requirements would be a violation of the property owner and subject to the enforcement provisions of PAMC. 84 25-Aug-26 City Council Critical-area signs and fencing Requested examples of approved signs and fencing used to protect critical areas.Staff will be working on new signage during implementation and will share drafts with Planning Commission and Council as requested. 85 31-Aug-26 City Council Pair groundwater wells with managed aquifer recharge Recommended pairing any future City groundwater-well project with aquifer recharge so high- flow recharge could support supplemental groundwater use during low Elwha River flows. Staff are prepared to coordinate with the Public Works Department on these efforts with future guidance from leadership. 86 31-Aug-26 City Council Watershed water-rights inventory and source options Asked whether the City could prepare a watershed inventory of water rights to identify options and the pros and cons of aquifer recharge, groundwater wells, and source switching during low Elwha River flows. Staff would need further direction from leadership, and capacity, to work on a project of this nature. 87 31-Aug-26 City Council Regional water initiative and examples Noted that Washington’s Water Initiative was seeking community input and provided Kitsap and Sequim-Dungeness managed-aquifer-recharge examples for context. Comment acknowledged. Attachment 3 23November 4, 2026 G - 87 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 1 4-Aug-26 Stakeholder PAMC 15.02 — Development and restoration Asked whether restoration efforts or activities are included within the definition of “development” and suggested adding a formal definition of “restoration.” Restoration efforts are not considered under the umbrella of "development", however, they are subject to the exempt and allowed uses activities regulated under the proposed 15.22.070 and .080. A definition for restoration has been added. 2 4-Aug-26 Stakeholder PAMC 15.02 — Priority species Requested verification of the WAC citations and the source and reliability of information used in the “priority species” definition. The definition of "priority species" is from WAC 173-26-020(31). 3 4-Aug-26 Stakeholder PAMC 15.22.050 — Third- party review Asked what specific conditions trigger third-party review, who selects the reviewer, and what criteria the City uses to determine when review is required. 15.22.170 further establishes when third-party review may be warranted. The reviewer would be chose by the City, at the applican'ts expense, if a proposal does not adhere to the criteria established, or if there appear to be discrepencies with reporting based on institutional and local knowledge. 4 4-Aug-26 Stakeholder Professional disagreements and costs Asked who makes the controlling determination when technical experts disagree, how conflicting professional opinions are resolved, and who is responsible for associated review costs. See above response. 5 4-Aug-26 Stakeholder Land Capacity Analysis Requested additional explanation of how critical areas are accounted for or subtracted in the Land Capacity Analysis and how that relates to conclusions regarding development capacity. The land capacity analysis that was performed during the comprehensive plan periodic update did not take into consideration the acreage contained within critical areas. They were otherwise exempted from the land capacity analysis and not included in the conclusions regarding development capacity within the city. 6 4-Aug-26 Stakeholder PAMC 15.02 — No net loss Suggested broadening the definition of “no net loss” beyond fish life and wildlife habitat to address ecosystem functions and values consistent with WAC 365-196-830(4). Comment acknowledged and addressed accordingly. 7 4-Aug-26 Stakeholder PAMC 15.22.010(A) — Purpose Suggested revising the purpose statement to include protection and, where feasible, enhancement of critical- area functions and values, consistent with the 2023 amendment to RCW 36.70A.020(10). Comment acknowledged and addressed accordingly. 8 4-Aug-26 Stakeholder PAMC 15.22.010 — Public trust / Aquatic resources Flagged the proposed public-trust language as a federal-water-regulation legal term.Comment acknowledged. 9 4-Aug-26 Stakeholder Regulatory flexibility and reasonable economic use Requested clarification of the extent of the City’s “limited flexibility” when applying critical-area requirements and what constitutes reasonable economic use of a property. The determination of "reasonable economic use" of a property would be decided by the hearing examiner. In most instances, a reaonable economic use may be considered a single-family residence, or potentially a mixed-use facility, depending on the underlying zone. "Limited flexibility" means that the regulations established in the CAO must be construed narrowly and are not intended to be interpreted in various ways. 10 4-Aug-26 Stakeholder PAMC 15.22.080(A)(4)(h) — Viewshed enhancement Requested identification of the Best Available Science supporting the 25-percent living-canopy thinning standard and explanation of how the standard protects shade, temperature, microclimate, and wildlife- screening functions. 25% removal of the living canopy of a given tree is based on industry practice developed by the International Society of Arboriculture for maintaining tree health and vigor. Most of the requests the City receives for viewshed enhancement are for trees located in geologically hazardous areas and are not adjacent to watercourses. In situations where that request may come into play, maintaining 75% of a tree's canopy will allow the tree to continue to provide the ecosystem services such as shade, temperature management, steep slope erosion control and bluff stability. 11 4-Aug-26 Stakeholder Conflicting regulations Asked which regulation controls when critical-area requirements conflict with another code provision and how such conflicts may affect future use or development of a property. In a situation where other provisions conflict with the CAO requirements, that which provides the greater protection of the critical area's functions and values takes precedence. This provision is found in 15.22.020.B. 15 4-Aug-26 Stakeholder PAMC 15.22.020 — Applicability Suggested adding specific code cross-references or links to related provisions governing applicability and review. Links will be added as time permits prior to final adoption for easy reference. 16 4-Aug-26 Stakeholder PAMC 15.22.030 — Critical- area maps Requested that procedures for updating critical-area maps and designations accommodate updated information, new sources, and changing site conditions. Internal procedures can be drafted outside of the CAO for how and when to update City maps, in coordination with the GIS department. Comments - Community Stakeholders Attachment 3 24November 4, 2026 G - 88 17 4-Aug-26 Stakeholder Qualified-professional standards Requested confirmation that qualified-professional determinations rely on recognized education, experience, certification, and licensing standards. Yes, qualified professionals must have a degree, certification, or experience in the field in which they are representing. 19 4-Aug-26 Stakeholder PAMC 15.22.010 — Purpose Suggested combining or revising the purpose provisions to more clearly integrate environmental and habitat protection into the ordinance’s core purpose. Comment acknowledged. 20 4-Aug-26 Stakeholder Reasonable-use criteria Suggested including environmental protection within the health, safety, and welfare criteria used to evaluate a reasonable-use request. Environmental protection is identified in 15.22.100.A.4 and A.5, which require the reasonable use exception to be consistent with the purpose and intent of the chapter and will result in no net loss of ecological functions and values. 21 4-Aug-26 Stakeholder Wetland-buffer flexibility; Development and variance Raised concern about development and variance implications under the wetland-buffering options.Variances are processed as a Type III permit and must receive approval by the Hearing Examiner. These provisions are outlined in 15.22.100. 22 4-Aug-26 Stakeholder PAMC 15.22.070(F)(1)(b) — Emergency reporting Suggested shortening the 30-day post-emergency reporting period because 30 days may be too long to adequately document and evaluate emergency work. Comment addressed. Staff have reduced the 30-day requirement to 14 days. 24 4-Aug-26 Stakeholder Mitigation procedures Requested clarification of how mitigation is proposed, reviewed, conducted, monitored, and managed, including responsibility for overseeing the process. Depending on what critical area is needing mitigation, specific mitigatoin standards are outlined in each applicable article. For example, wetland mitigation requirements must adhere to a mitigation plan that is consistent with the Wetland Mitigation in Washinton State - Part 2, developed by the Department of Ecology. Fish and Wildlife Habitat Conservation Areas must have a habitat management plan developed for any proposed use imapcting those areas. How a professional chooses to draft monitoring and oversight is up to the consultant, but must be approved by the city. 25 4-Aug-26 Stakeholder Applicant mitigation responsibilities Asked why the applicant bears responsibility for demonstrating that proposed mitigation meets ordinance requirements. The applicant is responsible for providing a mitigation plan for review by the city, who then determines if it meets the ordinance requirements. It is up to the applicant to hire a qualified professional who can develop a plan that is consistent with the ordinance, rather than having the city be responsible for the preparation of such plans. 29 4-Aug-26 Stakeholder PAMC 15.22.090(C)(4)(f) — Stream crossings Suggested adding specific provisions addressing when and how directional boring beneath streams may be permitted and regulated. Comment acknowledged. 30 4-Aug-26 Stakeholder Mitigation banking Asked whether the City currently has, participates in, or intends to establish a mitigation bank and when mitigation banking may be used. The city does not currenlty have or participate in a mitigation bank within city limits. 31 4-Aug-26 Stakeholder PAMC 15.22.010(C) and (D) — Reasonable use Requested clarification of the meaning and application of “reasonable use” and suggested providing relevant case-law examples or implementation guidance to assist with future interpretation. Criteria for consideration as a "reasonable use" are set forth in Section 15.22.100. Do to the difficult nature of what is and is not defined as a reasonable use makes it hard to define, which is why the decision is to be made by the hearing examiner. 32 4-Aug-26 Stakeholder Critical-area map currency / draft status Asked whether the map is current or reflects the draft Critical Areas Ordinance updates.The land capacity analysis map was developed during the comprehensive plan periodic update and used existing critical areas designations, not the proposed draft CAO updates. 33 23-Sep-26 Futurewise Tribal consultation and treaty resources Requested a defined consultation process for affected treaty tribes on proposals and amendments affecting streams, wetlands, fish and wildlife habitat, floodplains, aquifers, exceptions, and mitigation. The printed 2025 year is a confirmed typo; the letter is dated September 23, 2026. Added section 15.22.025 Tribal Consultation as suggested. 34 23-Sep-26 Futurewise Wetland buffer science basis Requested that the record identify the best available science supporting wetland buffer widths, reductions, and averaging, including Ecology guidance and reasons for any departures.Added a reference to the Department of Ecology Wetland Guidance for Critical Areas Ordinance (CAO) Updates as the source for determining wetland buffers. 35 23-Sep-26 Futurewise Buffer reduction and averaging safeguards Requested complete and enforceable minimization measures, professional findings, third-party review, tribal consultation, and limits protecting listed species and treaty resources for buffer reductions or averaging; suggested deleting the reduction provision or narrowing it. Modifications to the buffer averaging and reduction subsections have been made to ensure the regulations still protect the functions and values of the wetland and buffer. 36 23-Sep-26 Futurewise Reasonable use exception criteria Requested tighter reasonable-use exception criteria, including limits to the applicable subsection, self-created hardship, public safety, listed-species effects, and evaluated less-impactful alternatives. Reasonable Use Exceptions have been modified as suggested, ensuring limiting to the applicable subsection, and including the remaining references in the Dept. of Commerce handbook. Attachment 3 25November 4, 2026 G - 89 37 23-Sep-26 Futurewise Variance scope and minimum impacts Requested that variances apply only to setbacks or dimensional standards and not authorize critical-area or buffer alteration; urged minimum necessary impacts and protection of listed species and treaty rights. Amended as suggested. 38 23-Sep-26 Futurewise Previously altered critical areas and restoration Warned that the previously altered-area allowance could authorize development in functioning riparian areas; requested field evidence of permanently lost functions and a rule that does not foreclose restoration.Modified to ensure functions and values are not lost and provided an avenure for restoration and additional field reporting. 39 23-Sep-26 Futurewise Streams and wetlands as drainage facilities Requested that natural streams, fish-bearing streams, and wetlands not be converted to drainage facilities under PAMC 15.22.090.C.3; suggested limiting the provision to constructed ditches or facilities with improved habitat or water quality.This section has been modified based on feedback provided by Ecology. 40 23-Sep-26 Futurewise Nonconforming structures and disaster reconstruction Requested that reconstruction after disaster receive review in every critical area and buffer, not just geologic- hazard areas, and that reconstruction avoid expansion or intensification.Modified for clarity and consistency with other critical areas, not just geologically hazardous areas. 41 23-Sep-26 Futurewise Demolition and nonconformity limits Warned that demolition followed by rebuilding could turn an old footprint into a new development entitlement; requested limits on expansion, long discontinuance, and major redevelopment of nonconforming uses. Language added to note that new construction may not rely on the footprint of a demolished structure, except as allowed for replacement after a natural hazard such as a fire. 42 23-Sep-26 Futurewise Definitions for emergency, reference condition, watercourse, and variance Requested definitions or clearer standards for minimum emergency intervention, imminent risk, reference condition, watercourse, and special circumstances used in variance decisions. Definitions were updated accordingly for clarity. 43 23-Sep-26 Futurewise Agriculture drafting and best management practices Identified a possible drafting error in the ongoing-agriculture provision and requested distinctions between existing and new agriculture, NRCS practices, monitoring, and adaptive management. Drafting error corrected and definitions added for agriculture. 44 23-Sep-26 Futurewise Director findings and appeal Requested written findings, qualified-professional input, and appeal rights when the Director determines which conflicting rule offers greater protection or waives reporting.Amended to remove ambiguity with Director determinations. 45 23-Sep-26 Futurewise Stream crossings and future hydrology Requested stream-crossing design for projected peak flows and fish passage over the structure’s service life, with explicit reference to applicable WDFW work windows.Amended as suggested. 46 23-Sep-26 Futurewise Wildlife-permeable fencing Requested that required permanent fencing remain permeable to wildlife, or that signs or native planting be used where fencing would obstruct habitat connectivity.Amended as suggested. 47 23-Sep-26 Futurewise Daylighting and flood-risk standard Requested a measurable hydraulic standard for daylighting that compares projected flood risk to existing conditions, rather than requiring proof that no flooding occurs anywhere in the basin. Amended as suggested. 48 23-Sep-26 Futurewise CARA purpose and groundwater functions Requested that the CARA purpose statement protect groundwater used for individual and public potable supply, stream baseflow, wetlands, and fish habitat, rather than focus solely on possible future City supply. Amended as suggested. 49 23-Sep-26 Futurewise Land-disturbing activity definition Requested a broader land-disturbing-activity definition covering clearing, compaction, grading, fill, and drainage that affect recharge or wetland hydrology even without erosion or sedimentation.The definition of land-disturbing-activity includes references to clearing, grading, filling and excavating. Additional language was added to include modifications to a reduction in aquifer recharge or altered wetland hydrology. 50 23-Sep-26 Futurewise Garden exemption Requested that the existing-garden exemption include fish and wildlife habitat protections, exclude wetlands and synthetic chemicals, and explain its science basis for gardens in buffers. Upon further review and consultation with the Department of Commerce Handbook, the established garden and landscape maintenance exemption was removed. 51 23-Sep-26 Futurewise Floodplain habitat assessment exemptions Requested narrower floodplain habitat-assessment exemptions for work affecting streams, riparian vegetation, or listed species, and clearer terms for maintenance and restoration. Modified language in 15.22.370 to improve clarity - the intent was not to exempt certain activities from the report, but rather, exempt certain portions of the report if deemed not necessary. Staff removed the "unless otherwise exempted" from the narrative. 52 23-Sep-26 Futurewise Utility maintenance in wetland buffers Requested specific conditions for routine utility maintenance in wetland buffers, including limits on clearing, herbicide use and restoration of disturbed areas. Added language around clearing limits, restoration of disturbed areas, and the use of aquatic herbicides when necessary. 53 23-Sep-26 Futurewise Mitigation sequencing and approval Requested an express statement that compliance with mitigation sequencing does not itself entitle a proposal to approval and correction of the mitigation-section cross-reference.Added language clarifying the meeting the mitigation sequencing requirement does not entitle a proposal to approval. Corrected the cross-reference. 54 23-Sep-26 Futurewise Mitigation monitoring duration Requested longer mitigation monitoring than the draft two-year minimum, informed by Ecology guidance, and tribal access to monitoring reports for stream and wetland buffer projects.Increased the monitoring duration from two to five years. 55 23-Sep-26 Futurewise Commerce transmittal timing Requested confirmation that the amendments have been or will be transmitted to Commerce at least 60 days before adoption, alongside the letter’s requested substantive revisions. Yes, the draft amendments were sent to Commerce on September 3rd and are currently being reviewed by the applicable agencies. Attachment 3 26November 4, 2026 G - 90 #Date Name Code Section / Topic Comment (may be paraphrased or abridged)Response / Recommendation 1 14-Aug-26 Washington Department of Natural Resources (DNR) General — Draft CAO materials Indicated that the proposed amendments and supporting materials generally look good and that the Critical Areas Checklist and public notice were useful. More detailed comments were limited because the Geologically Hazardous Areas article has not yet been drafted. Comment acknowledged. 2 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.02.010 — Qualified professional Recommended retaining the existing critical-area-specific qualification requirements rather than replacing them solely with general language concerning licensure, training, and experience. Noted that the proposed general language does not specify Washington licensure and that the existing language provides greater clarity regarding professionals reviewing geologically hazardous areas. Comment acknowledged and addressed accordingly. 3 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.02.010 — Technical scientist Recommended adding a definition of “technical scientist” because the term is used in PAMC 15.22.030(A).Comment acknowledged. 4 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.030(C) — Critical-area rating and classification Requested clarification of the rating categories used to classify critical areas and whether those categories correspond to known or suspected risk, no known risk, or unknown risk due to insufficient data. This section is a general statement that critical areas will be classified and rated based on the criteria of the subsection. Specific ratings will be based on the requirements of the applicable critical area as determined necessary by a qualified professional. 5 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.030(C) — Documentation of ratings Asked where City-determined critical-area ratings will be documented, including whether the information will be included in the permit or application record or recorded on the property title. Rating information will be included in the permit after a review of the application, as well as incorporated to any deed restrictions or title requirements. Specific protocols for ratings are outlined in the applicable critical area's article. 6 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.090 — Permitted uses or activities Recommended providing more specific requirements for reports or studies prepared by qualified professionals when critical-area permit review is required, or adding a cross-reference to the section containing those requirements. Cross-references added in 15.22.090.B.2. 7 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.110 — Critical Areas Report Expressed support for the proposed mitigation, monitoring, maintenance, and financial-guarantee requirements. Comment acknowledged. 8 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.120 — Minimum report requirements Recommended requiring critical-area reports to address stormwater management, grading and erosion, and the applicable factor of safety. Stormwater requirements are identified in 15.22.120.B.2. 9 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.150 — Title notice Recommended requiring notice to be recorded on the title of all properties containing critical areas, rather than limiting the requirement to properties containing designated critical-area tracts. Comment acknowledged. Staff will work with the City's Legal Department to ensure adequate languge is incorporated regarding a record on title. 10 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.150 — Critical- area tract fencing Noted that fencing may or may not be necessary to delineate a critical-area tract and suggested allowing the requirement to be determined based on site conditions. Comment acknowledged. 11 14-Aug-26 Washington Department of Natural Resources (DNR) PAMC 15.22.160 — Field identification and markings Expressed support for the proposed field-identification and marking requirements.Comment acknowledged. 12 14-Aug-26 Washington Department of Natural Resources (DNR) Geologically Hazardous Areas — Article to be drafted Noted that the Geologically Hazardous Areas article remains to be drafted and indicated an interest in reviewing the article when it becomes available. Comment acknowledged. 13 14-Aug-26 Washington Department of Natural Resources (DNR) Geologically hazardous areas and natural resource lands Recommended considering references to the definition of geologically hazardous areas in WAC 365-190-120 and to the natural resource lands provisions in WAC 365-196-480 in the Comprehensive Plan, development regulations, Shoreline Master Program, or other applicable City documents. Comment acknowledged. Comments - Government Agencies Attachment 3 27November 4, 2026 G - 91 14 14-Aug-26 Washington Department of Natural Resources (DNR) Geologic information and mapping Recommended consulting the Washington Geologic Information Portal for current geologic information and mapping relevant to the City’s planning and regulatory work. Comment acknowledged. 15 14-Aug-26 Washington Department of Natural Resources (DNR) Geologic planning resources Recommended consulting the Washington Department of Natural Resources’ Geologic Planning resources during current or future Comprehensive Plan, development-code, Shoreline Master Program, and critical-area updates. Comment acknowledged. 16 25-Sep-26 Washington State Department of Ecology Emergency mitigation and restoration timing Recommended retaining post-emergency minimization and mitigation requirements and establishing a restoration, rehabilitation, or replacement deadline; suggested initiating restoration within one year and completing it in a timely manner. Definition of "emergency" has been updated to ensure compliance with the regulation once the immediate threat has been adressed. Further regulation surrounding emergency actions has been established in 15.22.070.F.1. 17 25-Sep-26 Washington State Department of Ecology Marine bluff definition and shoreline jurisdiction Asked whether the marine-bluff definition is needed if all marine bluffs fall within shoreline jurisdiction, where the SMP regulates shorelines of the state. Yes, all marine bluffs fall within the shoreline. The definition has been removed as advised. 18 25-Sep-26 Washington State Department of Ecology Shorelines of the state terminology Recommended deleting redundant "and shorelands" wording or clarifying that shorelines of the state includes shorelines, shorelines of statewide significance, and shorelands. Removed "and shorelands" from the definition as advised. 19 25-Sep-26 Washington State Department of Ecology SMP incorporation and CAO applicability Stated that the current SMP incorporates dated Title 15 provisions and that the updated CAO would not apply within shoreline jurisdiction until the SMP is amended. Recommended reconsidering 15.22.020(B)(1) based on SMP amendment timing and the referenced proposed SMA rulemaking, and keeping shoreline-specific language in the SMP. All mention of shorelines has been removed from the CAO in accordance with the guidance provided by Ecology to keep shoreline specific language in the SMP, not the CAO. 20 25-Sep-26 Washington State Department of Ecology Shoreline permit administration Recommended deleting the shoreline-review and permitting sentence because the updated CAO would not apply in shoreline jurisdiction until the SMP is amended. Removed per the suggestion. 21 25-Sep-26 Washington State Department of Ecology Wetland buffer walkways and trails Recommended walkway and trail criteria addressing minor crossings, water quality, placement parallel to the wetland perimeter and within the outer 25 percent of the buffer, avoidance of significant, old-growth, or mature tree removal, pervious surfaces, a five-foot maximum width, and pedestrian use. Acknowledged and modified accordingly for trails in wetlands. See 22 25-Sep-26 Washington State Department of Ecology Previously altered areas and mitigation sequencing Recommended requiring avoidance and minimization first in the mitigation sequence for development in previously altered critical areas. Added a reference to mitigation sequencing requirements. 23 25-Sep-26 Washington State Department of Ecology Previously altered areas and remaining functions Asked whether the provision applies to areas degraded by alterations and stated that remaining critical-area or buffer functions should be protected through mitigation before development is allowed. Acknowledged and removed this as a criteria, noting that restoration and rehabilition of the area should be considered in the proposal. 24 25-Sep-26 Washington State Department of Ecology Drainage facilities and wetland alterations Asked whether the drainage-facility provision concerns stormwater and recommended specific criteria for LID or flow-control alterations, including wetland category and habitat score, no net loss, native amphibians, hydrologic improvement or restoration planning, natural runoff routing, and compliance with wetland and stormwater requirements. Amended as recommended. 25 25-Sep-26 Washington State Department of Ecology Existing and ongoing agriculture definition Recommended defining existing and ongoing agriculture and supplied guidance distinguishing ongoing activities from new agricultural conversion, conversion to nonagricultural use, and prolonged inactivity, with a conservation-program exception. Added a definition for agricultural activities, existing and ongoing. 26 25-Sep-26 Washington State Department of Ecology Wetland mitigation preference Recommended the compensatory mitigation preference in the 2021 interagency guidance: re-establishment, rehabilitation of hydrologic processes, creation, preservation, then enhancement. The draft ordinance lists the preference for mitigation in the correct order. 27 25-Sep-26 Washington State Department of Ecology Mitigation table titles Requested checking that tables have titles.Confirmed all tables have titles. 28 25-Sep-26 Washington State Department of Ecology Wetland preservation ratios Recommended checking Appendix E of Ecology's Wetland Guidance for CAOs and stated that preservation uses the same ratios as enhancement where preservation is an option. Verified ratios are correct using Tables 1 and 2 in Appendix E of the Wetland Guidance Document. 29 25-Sep-26 Washington State Department of Ecology Marine shoreline references in hazard buffers Recommended deleting marine-shoreline references here and in 15.22.440(A)(4), stating that shoreline- specific language belongs in the SMP and that the updated CAO would not apply in shoreline jurisdiction until the SMP is amended. Removed marine shoreline references as advised. 30 25-Sep-26 Washington State Department of Ecology Marine shoreline habitat purpose Recommended deleting the marine-shoreline reference, citing RCW 36.70A.480(5) and SMP regulation of shorelines of the state. Deleted as advised. Attachment 3 28November 4, 2026 G - 92 31 25-Sep-26 Washington State Department of Ecology Waters of the state and shoreline exclusion Recommended clarifying the RCW 90.48.020 waters-of-the-state reference to exclude shorelines of the state, citing the GMA/SMA separation in RCW 36.70A.480. Modified as advised. 32 25-Sep-26 Washington State Department of Ecology FWHCA shoreline applicability Recommended removing shoreline-specific language from the CAO and addressing it in the SMP, stating that the updated CAO would not apply in shoreline jurisdiction. Removed as advised. 33 25-Sep-26 Washington State Department of Ecology Marine FWHCA buffer cross- reference Recommended deleting the marine FWHCA buffer cross-reference because 15.22.020 already addresses SMP regulation of shorelines of the state. Removed as advised. Attachment 3 29November 4, 2026 G - 93 EXHIBIT 1: STAFF REPORT TO: Planning Commission FROM: Planning Division DATE: Wednesday, September 23, 2026 RE: Municipal Code Amendment Application 26-0090 I.BACKGROUND The City is undertaking a multi-phased municipal code update to improve clarity, organization, and alignment with the Vision 2045 Comprehensive Plan. This effort builds on prior City Council direction and the adopted Municipal Code Amendment work plan. Phase 2 of this work plan was introduced to the Planning Commission on May 27, 2026, as a periodic update to the City’s Critical Areas Ordinance (CAO). The proposed municipal code updates are required under the Growth Management Act (GMA) and must be completed by December 31, 2026. This report details a comprehensive review of the planning and engagement processes for the critical areas ordinance public hearing. The proposed amendments have been drafted to improve clarity, readability, and consistency with best available science guided by state and federal agencies. The amendments have reorganized the existing CAO into a more streamlined development regulation that will be easier for both internal and external users of the code to navigate. Definitions have been updated and consolidated, and each of the five regulated critical areas have specific development regulations established. The amendments serve to balance reasonable protection standards for critical areas, as well as the protection of people, infrastructure and buildings from the hazards associated with development in or adjacent to critical areas. Throughout the CAO code writing processThe CAO staff have presented and requested feedback from the Planning Commission and City Council. This includes an internal code audit work, targeted outreach with stakeholders, and a formal public process. The following timeline summarizes the major milestones supporting the development of the proposed amendments. •January 28, 2026. The Planning Commission adopts the staff-recommended 2026-2028 Planning Commission Workplan, which includes MCA 26-0090 as Phase 2 of the planned four-phase development code update. •May 27, 2026. Staff introduced Phase 2 to the periodic update to the City’s Critical Areas Ordinance. •April through August 2026. Staff conducted an internal kickoff, scope definition, code 1November 4, 2026 G - 94 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 2 of 10 audit, drafting, interdepartmental review and refinement, and external stakeholder engagement of the Phase 2 amendment package. • June through August, 2026. Staff brought proposed amendments to the Planning Commission for review, and public comment. • August 25, 2026. City Council work session. • Septmeber 23, 2026. Planning Commission public hearing of the amendments. • November 17, 2026. City Council Adoption of the Critical Areas Ordinance. Upon Council adoption, implementation identified in the Phase 2 work program includes updates to frequently asked questions, website content, mapping and GIS updates, and the development of handbooks for homewoners, relators, and any other interested party. II. CODIFICATION GOALS AND OBJECTIVES The Planning Commission has been asked to consider the Phase 2 amendment package as a comprehensive update to Title 15 of the Port Angeles Municipal Code. Staff have approached this proposal through the following goals and objectives: Goal 1: Complete a critical areas ordinance update that complies with GMA periodic update requirements and the inclusion of best available science. Objective 1.1: Align Title 15 with the state-mandated Critical Areas Ordinance update associated with the 2025 Growth Management Act periodic update. Objective 1.2: Ensure amended critical areas regulations reflect best available science current best practices, and net gain of critical areas where feasible. Objective 1.3: Maintain consistency between local code, adopted plans, and applicable state requirements governing environmental review, critical areas protection, and related procedures. Objective 1.4: Deliver an adopted ordinance prior to the December 31, 2026 deadline set by the Growth Management Act. Goal 2: Redevelop Title 15 to provide administrative clarity for both the community and members of the city team. Objective 2.1: Consolidate critical areas regulations into a more clearly organized chapter structure so standards are easier to locate, interpret, and administer. Objective 2.2: Update environmental definitions and related terminology to support consistent interpretation across affected chapters. Objective 2.3: Improve readability of environmental review requirements for staff, applicants, property owners, contractors, and qualified professionals. 2November 4, 2026 G - 95 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 3 of 10 Objective 2.4: Clarify how critical area regulations mitigate the impacts associated with development activities, including clearing, grading, utilities, and related site work across affected code titles. Goal 3: Amend Title 15 to contain established methods, rules, and sequences of action to ensure procedural consistency. Objective 3.1: Align review thresholds, submittal expectations, and procedural references with PAMC 18.02 and related permit processing requirements. Objective 3.2: Remove outdated, duplicative, or conflicting provisions that create uncertainty during environmental review and code administration. Objective 3.3: Improve coordination across Community and Economic Development, Public Works, Parks and Recreation, Legal, and Communications functions during code administration and rollout. Goal 4: Improve public usability and long-term implementation through handbooks, BMPs, and FAQs. Objective 4.1: Support clearer public-facing implementation through improved code structure, website content, frequently asked questions, and handbook development. Objective 4.2: Use stakeholder and Planning Commission review to vet the amended code for readability, consistency, and practical administration. Objective 4.3: Prepare the amended code for long-term implementation through staff training, public education, and maintenance of a more usable environmental code structure. III. OUTREACH AND ENGAGEMENT Targeted outreach completed or underway includes: • Planning Commission 2026-2028 Workplan Adoption – January 28, 2026 • Dedicated website to MCA 26-0090 – May 2026 • Builder’s Roundtable MCA 26-0090 Introduction – May 15, 2026 • Planning Commission MCA 26-0090 Introduction – May 27, 2026 • Stakeholder Advisory Committee Meetings – June – August 2026 • Planning Commission Amendment Review – June – August 2026 • KONP Todd Ortloff Radio Appearance and Discussion – August 5, 2026 • City Council Work Session – August 25, 2026 • Planning Commission Public Hearing – September 23, 2026 3November 4, 2026 G - 96 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 4 of 10 IV. PROCEDURE MCA 26-0090 is a citywide non-project actions that require public notice, a public hearing, and a final legislative decision by the City Council. These actions were accomplished on the following dates: • August 19, 2026. Public notice for MCA 26-0090 was published in the Peninsula Daily News and on the City’s Website. • September 3, 2026. 60-day notice to the Department of Commerce. • September 23, 2026. Written comment period close. • September 23, 2026. Planning Commission public hearing. • October 20, 2026. City Council first reading of ordinance. • November 17, 2026. City Council second reading of ordinance and adoption. V. COMMENTS Public Comment: See Exhibit 3, Public Comment Memo. The public comment memo and matrix also contain all comments and questions received from Planning Commission, Stakeholders, City Council, and other government agencies to-date. Exhibit 4 also contains questions and responses from the June 2026 Planning Commission Meeting. City of Port Angeles Departmental Comments: Comments received from the City of Port Angeles Departments have been incorporated into the proposed code amendments. VI. PROPOSED MUNICIPAL CODE UPDATES Title 15 – Environment The proposed amendments strike Chapter 15.20 – Environmentally Sensitive Areas Protection entirely and incorporate them into a new chapter titled 15.22 – Critical Areas. Chapter 15.02 – Definitions now consolidates applicable definitions and includes additional definitions for clarity and reference. Chapter 15.24 – Wetlands Protection have been struck entirely and are proposed to be incorporated under Article III – Wetlands of Chapter 15.22. VII. FINDINGS OF FACT AND STAFF ANALYSIS Comprehensive Plan All municipal code amendments must be consistent with the Port Angeles Comprehensive Plan. The following adopted goals and policies are the strongest direct policy support for the CAO amendment package. Land Use Element: 4November 4, 2026 G - 97 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 5 of 10 Goal LU-1: Land Use Pattern. Establish and manage a pattern of development consistent with the community’s vision and provide for a variety of land uses that further the policies of this Plan. Guide land development to balance certainty with flexibility to adapt to future challenges and opportunities. Policy LU-1.8: Avoid split zoning in creek riparian zones and bluffs, and use the critical areas ordinance to protect environmentally sensitive features. However, designate creek riparian zones and bluffs as “open space” on the Future Land Use Map to signal their significance to the ecology and community of Port Angeles and explore ways to connect these open spaces to create habitat corridors. Goal LU-7: Growth Management and Regional Cooperation. Regulate development, manage growth, and annex land in a responsible manner that is beneficial to the community as a whole and is consistent with the Washington State Growth Management Act. Policy LU-7.5: Assure that development review and permit processes operate in a fair, timely, and predictable manner and update processes from time to time to incorporate best practices, changes in law, and align with community priorities and values. Conservation Element: Goal C-2: Protect and enhance the area's unique physical features, its natural, historical, archaeological, and cultural amenities, and the overall environment. Policy C-2.3: Recognize the essential role of critical areas and the shoreline in community health and ecological resilience. Strive for net ecological gain, in State-designated Critical Areas, of functions and values when feasible, with close guidance from WDFW’s best available science. Policy C-2.7: Reference the most recently adopted Washington State Citations of Recommended Sources of Best Available Science for Designating and Protecting Critical Areas and other research identified as more locally appropriate and applicable when available as Best Available Science in the Critical Areas Ordinance. Hazard Mitigation & Climate Resiliency Element: Goal HM-4: Ensure the protection and restoration of streams, riparian zones, estuaries, wetlands, and floodplains to achieve healthy floodplains that are more resilient to climate change. Policy HM-4.1: Protect and restore watershed-scale processes to maximize the ecological benefits and climate resilience of riparian ecosystems, utilizing best available science. Utilities & Public Services Element: 5November 4, 2026 G - 98 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 6 of 10 Goal U-3: Prepare conservation strategies and protect water quality to increase resilience to drought, sea level rise, and reduced snowpack. Policy U-3.3: Maintain and enhance the quality of water resources through the regulation of clearing, grading, dumping, discharging, and draining, and the provision of flood and erosion control measures and regulations to protect wetlands and other environmentally sensitive areas. Use adaptive management practices and best available climate science and projections to inform these efforts. Staff Analysis: Collectively, these goals and policies provide direction for the critical area protection, environmental resilience, water quality, and development review provisions proposed through MCA 26-0090. The proposal supports Goal LU-1 and the critical area protection component of Policy LU-1.8 through standards for identifying and protecting critical areas and their buffers. Consolidated definitions and coordinated review requirements support Goal LU-7 and Policy LU-7.5 by clarifying how these standards are applied. Goal C-2 and Policies C-2.3 and C-2.7 are supported through the use of best available science in critical area review and mitigation. The proposed regulations require mitigation sequencing to achieve no net loss of functions and values and encourage net ecological gain where feasible. Goal HM-4 and Policy HM-4.1 are supported through wetland, floodplain, and riparian provisions that protect ecological functions, maintain floodwater storage, and address development impacts through mitigation and restoration. The proposal also supports Goal U-3 and Policy U-3.3 through critical aquifer recharge area protections and requirements for best management practices and review of clearing, grading, drainage, and other regulated activities affecting critical areas and water quality. Housing Action Plan The 2025 Housing Action Plan identifies local barriers to housing production and reuse, including aging housing stock, infrastructure constraints, limited workforce capacity, and regulatory barriers that can increase costs and uncertainty for applicants and property owners. 6November 4, 2026 G - 99 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 7 of 10 Staff Analysis: The Housing Action Plan is not the primary policy basis for MCA 26-0090. However, Task 2 in the Housing Action Plan addresses improvements to the City of Port Angeles’ weatherization and repair programs. Weatherization and energy rebates are valuable investments that can significantly enhance your home's comfort and efficiency. By properly sealing gaps, adding insulation, and making necessary upgrades, you can create a more consistent indoor temperature year-round. This not only reduces the strain on your heating and cooling systems, ultimately lowering your energy bills, but also contributes to a healthier living environment by minimizing drafts and reducing moisture buildup. In addition, the Housing Needs Assessment provides a land capacity analysis that looks at Port Angeles’ housing targets and the capacity of income bands. The land capacity analysis identifies critical areas, EPA Superfund sites, the 50% critical area reduction factor, partially used parcels, and re-developable parcels. Climate Resiliency Plan The primary policy basis for this CAO amendment package is the Comprehensive Plan, City Work Plan and the draft amendment text itself. The Climate Resiliency Plan and Implementation Plan contain several strategies and actions that address community resilience and wellbeing, ecosystem health, transportation, buildings and energy, and consumption & waste that can be achieved through critical areas regulation. Specific actions and activities from the Climate Resiliency Plan that are relevant to the CAO are identified below. Community Resilience and Wellbeing • Water supply monitoring & enhancement • Sea level rise vulnerability assessment of City assets • Comprehensive Plan priorities Ecosystem Health • Forest and marine habitat preservation • Urban tree canopy, parks, and open space • Native plant landscaping • Critical area protection • Coastal erosion reduction • Salmon habitat protection • Land-based pollutant reduction 7November 4, 2026 G - 100 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 8 of 10 Staff Analysis: The 2022 Climate Resiliency Plan includes a focus on community resilience and wellbeing and ecosystem health. MCA 26-0090 is consistent with that direction by implementing management strategies focused on protecting and enhancing critical areas, including but not limited to fish and wildlife habitat conservation areas. Protection standards for critical areas serve to preserve the ecosystem functions and values of wetlands, geologically hazardous areas, groundwater, and fish and wildlife habitat while also protecting our community from the potential hazards associated with building in or adjacent to critical areas. Many of our critical areas also serve as open space throughout the community, contributing to the community’s wellbeing while also contributing to the overall climate resiliency of the landscape. Port Angeles Municipal Code The following PAMC provisions are seen as relevant to this application. Planning Staff provides comments under each provision as a demonstration of the analysis conducted during the application review process and the findings of fact relevant to the application. Title 18 Per PAMC Section 18.02.050, the City Council has the authority to review and is authorized and directed to hear and decide on Type V permit applications. Staff Analysis: A Municipal Code Amendment requires a public hearing before the Planning Commission. The recommendation to the City Council is based on the draft plan, comprehensive public comments, the Port Angeles Municipal Code, and information available during the public engagement process. Such a decision may be appealed to the Superior Court, provided that the appeal is filed within 21 days of the City Council's decision, as per Chapter 36.70C RCW. If an appeal is not filed within the applicable period, the City Council's decision is final. A timely appeal of any City Council decision will stay all further proceedings by the Department of Community and Economic Development, specifically related to the periodic update under appeal. Environmental Review Amendments to the Critical Areas Ordinance are exempt from the requirements of the State Environmental Policy Act under RCW 43.21C.450(1) and RCW 43.21C.450(3). Consistency In preparation and submission of a Municipal Code Amendment, City Staff have demonstrated that all standards will be met in accordance with the City’s Comprehensive Plan and the Port Angeles Municipal Code. 8November 4, 2026 G - 101 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 9 of 10 VIII. CONCLUSIONS Having reviewed and considered the draft amendment package, public comment, and all other materials presented in the legislative record, City staff recommends that the Planning Commission forward a recommendation of approval to City Council for MCA 26-0090 based on the following conclusions: 1. Analysis and findings of fact from staff are based on the draft code language, municipal code, adopted plans, public comment, and other materials available during the review period. Collectively, the information contained in this staff report and its Attachments forms the record of review for this legislative amendment package. 2. MCA 26-0090 is citywide legislative actions affecting Title 15 of the Port Angeles Municipal Code. 3. The proposed amendments are organizational, procedural and adhere to the best available science as guided by state and federal agencies in accordance with the requirements established in Washington Administrative Code and the Revised Code of Washington. 4. The proposal improves administrative clarity by consolidating definitions and providing clear regulation for each of the five regulated critical areas; wetlands, critical aquifer recharge areas, frequently flooded areas, geologically hazardous areas, and fish and wildlife conservation areas. 5. The proposal is consistent with the adopted Comprehensive Plan policies addressing protection of critical areas, open space, and land use planning. 6. The amendment package is legislative and citywide and does not authorize site-specific disturbance or development independent of future permit review under applicable City regulations. IX. RECOMMENDATION The Planning Division recommends that the Planning Commission recommend approval of Municipal Code Amendment No. 26-0090 to the City Council. This recommendation is based on staff review of the draft code language, Port Angeles Municipal Code, adopted plans, and submitted public comments. X. EXHIBIT LIST Exhibit 2: Draft Code 26-0090 Exhibit 3: Public Comment Memo Exhibit 4: Planning Commission Q & A Exhibit 5: PC Phase 2 Introductory Memo Exhibit 6: Fish and Wildlife Habitat Audit and Analysis Memo 9November 4, 2026 G - 102 Exhibit 1: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 10 of 10 Exhibit 7: Wetlands Gap Analysis Memo Exhibit 8: Wetlands Buffer Analysis and Recommendation Memo Exhibit 9: August 26, 2026 Draft Planning Commission Minutes Exhibit 10: Stakeholder Advisory Committee Agendas Exhibit 11: Critical Areas Ordinance Checklist Exhibit 12: List of Resources 10November 4, 2026 G - 103 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Title 15 Environment WORKING REDLINE — CHANGED SECTIONS Underlined text indicates proposed additions. Struck text indicates proposed deletions. Please note the following color coordinated text for reference: Blue Text is language from existing regulation that has not been modified, Green Text is language from existing regulation that has been amended, and Black Text is new language entirely CHAPTER 15.02 DEFINITIONS 15.02.010 Definitions. These definitions must apply to Chapters 15.22 and 15.26 15.20, 15.24 and 15.28, additional definitions are located in individual chapters. “Anadromous fish” means a fish that is born in freshwater, spends much of its life in the sea, and returns to freshwater to spawn. “Aquifer recharge” is the infiltration of rainfall, snowmelt, infiltration from lakes, wetlands and streams, or irrigation water into the ground that adds to the underground water that can supply a well. “Aquifers used for potable water” are existing wells and their protection areas, sole source aquifers, and aquifers otherwise identified as important supplies. They should be identified by looking at existing and future planned uses. A. “Best available science” means That the current scientific information derived from a valid scientific process applicable to the critical area prepared by local, state or federal natural resource agencies, a qualified scientific professional or team of qualified scientific professionals, that is consistent with criteria established in WAC 365-195-900 through WAC 365-195-925 used in the process to designate, protect, and/or restore critical areas. B. “Best management practices (BMPs)” means physical or structural tools and/or management conservation practices or systems of practices and management measures that: , which, when used singularly or in combination, prevent or reduce adverse impacts to the functions and values of critical areas and their buffers, including: 1. Control soil loss and reduce water quality degradation caused by high concentrations of nutrients, animal waste, toxics, and sediment; 2. Minimize adverse impacts to surface water and groundwater flow, circulation patterns, and the chemical, physical, and biological characteristics of wetlands; 3. Protect trees and vegetation designated to be retained during and following site construction and use native plant species appropriate to the site for re-vegetation of disturbed areas; and 4. Provide standards for proper use of chemical herbicides within critical areas. C. “Buffer” means an undisturbed area adjacent to a critical area that is required to remain in an undisturbed and untouched condition to protect the functions and values of the critical area, unless otherwise exempted, allowed, or permitted by this chapter. D. “Compensatory mitigation” means the restoration (re-establishment or rehabilitation), establishment (creation), enhancement, and/or in certain circumstances preservation of wetlands for the purposes of offsetting unavoidable adverse impacts that remain after all appropriate and practicable avoidance and minimization has been achieved. 11November 4, 2026 G - 104 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 E. “Cowardian classification” means a commonly used classification system for wetlands first developed in 1979 by the US Fish and Wildlife Service and updated in 2013. The Cowardian system classifies wetlands based on water flow, substrate types, vegetation types, and dominant plant species. It is used for wetland classification in the National Wetland Inventory. F. “Critical aquifer recharge areas” are areas with a critical recharging effect on aquifers used for potable water, including areas where an aquifer that is a source of drinking water is vulnerable to contamination that would affect the potability of the water, or is susceptible to reduced recharge. G. “Critical areas” means “wetlands”, “critical aquifer recharge areas”, “fish and wildlife habitat conservation areas”, “frequently flooded areas”, and “geologically hazardous areas”. H.C. “Critical habitat” means habitat necessary for the survival of endangered, threatened, rare, sensitive, or monitor species as identified under the Endangered Species Act. I. “Cumulative impacts” means the impact on the environment that results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (federal or non-federal) or person undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time. J. D. “Development” means any activity upon the land consisting of construction or alteration of structures, earth movement, dredging, dumping, grading, filling, driving of piles, drilling operations, bulkheading, clearing of vegetation, or other land disturbance. Development includes the storage or use of equipment or materials inconsistent with the existing use. Development also includes approvals issued by the City that binds land to specific patterns of use, including zoning changes, conditional use permits, and binding site plans. Development activity does not include the following activities: 1. Interior building improvements. 2. Exterior structure maintenance activities, including painting and roofing. 3. Routine landscape maintenance of established, ornamental landscaping, such as lawn mowing, pruning, and weeding. 4. Maintenance of the following existing facilities that does not expand the affected areas: individual utility service connections; and individual cemetery plots in established and approved cemeteries. K. “Emergency” means those activities necessary to prevent an immediate threat to public health, safety, or welfare, or that pose an immediate risk of damage to private property and that require remedial or preventative action in a timeframe too short to allow for compliance with the requirements of the critical areas regulations L.E. “Engineer” means a professional civil engineer, licensed by and in good standing in the State of Washington. M. “Enhancement” means the manipulation of the physical, chemical, or biological characteristics of a wetland to heighten, intensify, or improve specific function(s) or to change the growth stage or composition of the vegetation present. Enhancement is undertaken for specified purposes such as water quality improvement, flood water retention, or wildlife habitat. Enhancement results in a change in some wetland functions and can lead to a decline in other wetland functions but does not result in a gain in wetland acres. Activities typically consist of planting vegetation, controlling non-native or invasive species, modifying site elevations or the proportion of open water to influence hydroperiods, or some combination of these activities. N. F. “Erosion” means the wearing away of the land or ground surface by the action of wind, water, ice, gravity, or any combination thereof. O. “Erosion hazard areas” are those areas containing soils which, according to the United States Department of Agriculture Natural Resources Conservation Service Soil Survey Program, may 12November 4, 2026 G - 105 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 experience significant erosion. Erosion hazard areas also include coastal erosion-prone areas and channel migration zones. P. “Establishment (or creation)” means the manipulation of the physical, chemical, or biological characteristics present to develop a wetland on an upland or deepwater site where a wetland did not previously exist. Establishment results in a gain in wetland acres. Activities typically involve excavation of upland soils to elevations that will produce a wetland hydroperiod, create hydric soils, and support the growth of hydrophytic plant species. Q. G. “Exotic” means any species of plant or animal that are not native to the area. R. “Fish and wildlife habitat conservation areas” are areas that serve a critical role in sustaining needed habitats and species for the functional integrity of the ecosystem, and which, if altered, may reduce the likelihood that the species will persist over the long term. These areas may include, but are not limited to, rare or vulnerable ecological systems, communities, and habitat or habitat elements including seasonal ranges, breeding habitat, winter range, and movement corridors; and areas with high relative population density or species richness. These areas do not include such artificial features or constructs as irrigation delivery systems, irrigation infrastructure, irrigation canals, or drainage ditches that lie within the boundaries of, and are maintained by, a port district or an irrigation district or company. S. “Floodplain” means the total area subject to inundation by the base flood. T. H. “Frequently flooded areas” means are lands in the floodplain subject to at least a one percent or greater chance of flooding in any given year (the 100-year storm flood), or within areas subject to flooding due to high groundwater. These areas include but are not limited to streams, rivers, lakes, coastal areas, wetlands, and the like areas where high groundwater forms ponds on the ground surface. U. “Functions and values” means the ecosystem services provided by critical areas to society, including, but not limited to, improving and maintaining water quality, providing fish and wildlife habitat, supporting terrestrial and aquatic food chains, reducing flooding and erosive flows, wave attenuation, carbon sequestration, thermal refugia, historical or archaeological importance, cultural uses and significance, educational opportunities, and recreation. V. “Geologically hazardous areas” are areas that because of their susceptibility to erosion, sliding, earthquakes, or other geological events, are not suited to siting commercial, residential, or industrial development consistent with public health or safety concerns. W. “Habitats of local importance” means fish and wildlife habitat conservation areas that are found to be of significance to the City of Port Angeles. X. “Hazard tree” means a tree that has been determined by an International Society of Arboriculture (ISA) Certified Arborist with a valid Tree Risk Assessment Qualification, to be a hazard to people, property, or infrastructure as a result of a risk assessment conducted according to ISA guiding principles. I. “Historic condition” means the condition of the land, including flora, fauna, soil, topography, and hydrology that existed before the area and vicinity were developed or altered by human activity. Y. J. “Hydraulic project approval (HPA)” means a permit issued by the state Department of Fish and Wildlife for modifications to waters of the state in accordance with Chapter 75.20 77.55 RCW. Z. “Impervious surface” means a surface area that either prevents or slows the entry of water into the soil or other substrate that would occur under natural conditions prior to development. A non-vegetated surface area that causes water to run off the surface in greater quantities or at an increased rate of flow from the flow present under pre-development or pre-developed conditions. AA.K. “Indigenous” means any species of plant or animal native to an area. Not introduced. BB.L. “Infiltration” means the downward entry of water into the immediate surface of soil. 13November 4, 2026 G - 106 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 CC. “Invasive species” means an organism that is not native to a specific ecosystem and whose introduction causes or is likely to cause harm to the environment, economy, or human, animal, or plant health. DD.M. “Joint aquatic resource permits application (JARPA)" means a single application form that may be used to apply for hydraulic project approvals, shoreline management permits, Department of Natural Resources use authorization, and Army Corps of Engineers permits. EE.N. “Land-disturbing activity” means any use of the land activity that results in the movement of earth, or a change in the existing cover (both vegetative and non-vegetative) and/or the existing soil topography, that may cause or contribute to erosion or sedimentation. Land disturbing activities include, but are not limited to, clearing, grading, filling, and excavation. Compaction that is associated with stabilization of structures and road construction will also be considered a land disturbing activity. Minor soil disturbance for site-investigation purposes or routine garden maintenance are not considered land- disturbing activities: 1. Change in the natural cover or topography that exposes soils or 2. May cause or contribute to erosion or sedimentation. This does not include nondestructive vegetation trimming. FF. “Landslide hazard areas” are areas at risk of mass movement due to a combination of geologic, topographic, and hydrologic factors. GG. “Locally unique features” means landforms and features that are important to the Character of the City of Port Angeles and the adjoining Port Angeles Urban Growth Area. These features or landforms often contain one or more critical area. Locally unique features in the Port Angeles region include ravines, marine bluffs, and beaches and associated coastal drift processes. HH.O.“Marine bluffs” means coastal features that resulted from wave erosion undercutting uplands located adjacent to the shoreline, creating vertical cliffs that are an important source of sediment for coastal drift processes and/or the landforms created by these processes. II.P. “Native” means any species of plants or animals that are indigenous to the area. JJ. “No net loss” of critical area functions and values means the maintenance of existing ecological functions and habitat conditions over time. It ensures that planned developments do not result in a decline of ecosystem functions and values by mandating strict adherence to sequential mitigation. KK.Q. “Nondestructive vegetation trimming” means the trimming, or pruning of trees, shrubs, or plants, that does not harm the continued life and health of the plant and uses best management practices for pruning as defined by the International Society of Arboriculture. LL. “Ordinary high water mark” means the mark which is found by examining the bed and banks of water bodies and ascertaining where the presence and action of waters are so common and usual, and so long continued in all ordinary years, that the soil has a character distinct from that of the abutting upland in respect to vegetation. MM.R.“Priority habitat”s means a habitat types or elements with unique or significant value to one or more species as classified by the Washington Department of Fish and Wildlife. A priority habitat may consist of a unique vegetation type or dominant plant species that is of primary importance to fish and wildlife such as eelgrass meadows, a described successional stage such as old-growth and mature forests, or a specific structural element such as a consolidated marine/estuarine shoreline or habitat snags. (WAC 173-26-020(3430). NN. “Priority species” means species requiring protective measures and/or management guidelines to ensure their persistence at genetically viable population levels, as defined by the Washington Department of Fish and Wildlife, that meet any of the criteria outlined in WAC 173-26-020(31)(a-d). 14November 4, 2026 G - 107 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 OO.S. “Puget Sound” means all salt waters of the State of Washington inside the international boundary line between the State of Washington and the Province of British Columbia, lying east of 123 degrees, 24 minutes west longitude and includes the Strait of Juan de Fuca. PP.T. “Qualified professional” means a person with relevant training, professional experience, and/or specific academic degrees or state licenses in the pertinent scientific discipline related to the critical area in question. experience and training in the applicable critical area. A qualified professional must have obtained a B.S. or B.A. or equivalent degree in biology, engineering, environmental studies, fisheries, geomorphology, or related field, and two years of related professional work experience. 1. A qualified professional for fish and wildlife habitats or wetlands must have a degree in biology, marine biology, wetland biology, or habitat ecology. 2. A qualified professional for a geologically hazardous area must be a professional civil engineer or geologist, licensed in the State of Washington. 3. A qualified professional for tree maintenance and tree pruning must be an arborist certified by the International Society of Arboriculture. QQ. “Protection/Maintenance (or Preservation)” means removing a threat to, or preventing the decline of, wetland conditions by an action in or near a wetland. This includes the purchase of land or easements, repairing water control structures or fences, or structural protection such as repairing a barrier island. This term also includes activities commonly associated with the term preservation. Preservation does not result in a gain of wetland acres, may result in a gain of functions, and will be used only in exceptional circumstances. RR. “Re-establishment” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former wetland. Re-establishment results in a gain in wetland acres (and functions). Activities could include removing fill material, plugging ditches, or breaking drain tiles. SS. “Reference condition” means a baseline standard, benchmark, or set of normal measurements used to compare and evaluate the health, quality, or performance of an ecosystem, environment, or scientific system. TT. “Rehabilitation” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural or historic functions of a degraded wetland. Rehabilitation results in a gain in wetland function but does not result in a gain in wetland acres. Activities could invoice breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. UU. “Restoration” means the manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural or historic functions to a former or degraded wetland. For the purpose of tracking net gains in wetland acres, restoration is divided into re-establishment and rehabilitation. VV. “Riparian area” means the area that encompasses both sides of a water body, composed of aquatic ecosystems, riparian ecosystems, and riverine wetlands. WW. “Riparian management zone (RMZ)” means the area that has the potential to provide full riparian functions, often synonymous with the riparian buffer. This area occurs within one 200-year site potential tree height measured from the edge of the stream channel. In places where the site potential tree height is less than 100 feet, the RMZ is set at 100 feet to provide for the pollution removal function. XX. “Seismic hazard areas” are areas subject to severe risk of damage as a result of earthquake-induced ground shaking, slope failure, settlement, soil liquefaction, debris flows, lahars, or tsunamis. YY. “Setback” means the required minimum distance for any use, structure, or building from a hazard critical area or its buffer that establishes the building envelope within which any structure or building 15November 4, 2026 G - 108 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 may be erected or placed. as required by a qualified professional to protect safety for occupants of a development and/or users of a site. ZZ. “Site potential tree height” means the average maximum height of the tallest dominant trees for a given age and site class. AAA. U “Topping or tree topping” means the indiscriminate cutting back of tree branches to stubs or lateral branches that are not large enough to assume the terminal role and is harmful to the life and health of the plant. Other names for topping include “heading”, “crowning”, or “tipping”. BBB.V. “Viewshed enhancement” means the removal or thinning of trees or vegetation to enhance a view when proposed in ravine and marine bluff critical area buffers so long as such alterations will not: 1. Increase geological hazards such as erosion potential, landslide potential, or seismic hazard potential as demonstrated by a qualified professional; 2. Adversely affect significant fish and wildlife habitat areas; 3. Through thinning, remove more than 30 25 percent of the live branches of a tree’s canopy; 4. Include felling, topping, or removal of trees in critical areas. Viewshed enhancement does not include nondestructive trimming of vegetation as defined in this title. CCC. “Wetland or wetlands” means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. However, wetlands may include those artificial wetlands intentionally created from non- wetland areas to mitigate conversion of wetlands, if permitted by the county or city. CHAPTER 15.20 ENVIRONMENTALLY SENSITIVE AREAS PROTECTION (MOVED TO CHAPTER 15.22) Chapter 15.20 is hereby deleted in its entirety and moved to a new chapter 15.22 for replacement. CHAPTER 15.22 CRITICAL AREAS ARTICLE I. GENERAL PROVISIONS 15.22.010 Purpose. A. The purpose of this chapter is to designate critical areas and to establish standards for the protection of and, where feasible, enhancement of, their functions and values, in compliance with the provisions of the Washington State Growth Management Act of 1990, and consistent with the goals and policies of the City of Port Angeles Comprehensive Plan, Climate Resiliency Plan, and Climate Resiliency Implementation Plan. B. By identifying and regulating development and alterations to critical areas and their buffers, this chapter seeks to accomplish the following goals: 1. Protect the public health, safety and welfare by avoiding disturbance of critical areas, minimizing unavoidable impacts, and mitigating impacts where necessary; 16November 4, 2026 G - 109 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 2. Protect the public from personal injury, loss of life or property damage due to flooding, erosion, landslides, seismic events, or soil subsidence; 3. Protect against publicly financed expenditures in the event critical areas are misused, which causes: a. Unnecessary maintenance and replacement of public facilities; b. Publicly funded mitigation of avoidable impacts; c. Cost for public emergency rescue and relief operations where the causes are avoidable; or d. Degradation of the natural environment. 4. Protect the public trust in navigable waters and aquatic resources; 5. Prevent cumulative adverse impacts to water availability, water quality, wetlands, fish and wildlife habitat, and the overall net loss of wetlands, frequently flooded areas, and habitat conservation areas; 6. Protect unique, fragile, and vulnerable elements of the environment, including wildlife and its habitat; 7. Alert appraisers, assessors, owners, potential buyers, or lessees to the development limitations of critical areas; and 8. Implement the policies of the State Environmental Policy Act (SEPA), Chapter 43.21C RCW; the City of Port Angeles Comprehensive Plan; this chapter of the Port Angeles Municipal Code; and all updates and amendments, functional plans, and other land use policies formally adopted or accepted by the City of Port Angeles. C. The regulations of this chapter are intended to protect critical areas in accordance with the Growth Management Act, through the application of best available science, as determined according to WAC 365- 195-900 through 365-195-925, and in consultation with state and federal agencies and other qualified professionals. D. This chapter is intended to be administered with limited flexibility and attention to site-specific characteristics. It is not intended to make a parcel of property unusable by denying its owner reasonable economic use of the property, or to prevent the provision of public facilities and services necessary to support existing development and that planned for by the community without decreasing current service levels below minimum standards. E. The city’s enactment or enforcement of this chapter must not be construed for the benefit of any individual person or group of persons other than the general public. 15.22.020 Applicability. A. Unless explicitly exempted, the provisions of this chapter apply to all land uses, development activity, and all structures and facilities within the City of Port Angeles that are within a critical area, within the maximum buffer distance of, or likely to affect the functions and values of one or more critical areas. Responsibility for administration and enforcement of the provisions of this chapter must rest with the Director of Community and Economic Development or their designee. B. Relationship to Other Regulations. 1. Shorelines of the state and shorelands as defined in RCW 90.58.030, and critical areas occurring within the jurisdiction of shorelines of the state and shorelands, are regulated and protected through the City of Port Angeles Shoreline Master Program (PAMC Chapter 15.08), as amended. Activities occurring within the shoreline jurisdiction are reviewed through the shoreline permit review and issuance process; a separate critical areas permit is not required. The Shoreline Master Program incorporates by reference portions of this chapter; however, certain provisions of this chapter that are not consistent with the Shoreline Management Act, Chapter 90.58 RCW, and supporting Washington Administrative Code chapters do not apply in shoreline jurisdiction. 17November 4, 2026 G - 110 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 2. These critical areas regulations apply in addition to zoning and other regulations adopted by the City. In the event of any conflict between these regulations and any other regulations of the City, the regulations apply that provide greater protection to the critical areas’ functions and values, as determined by the Director of Community and Economic Development. 3. When any provision of this chapter or any existing easement, covenant, or deed restriction conflicts with this chapter, that which provides more protection to the critical area applies. 4. Compliance with the provisions of this chapter does not constitute compliance with other federal, state, or local regulations and permit requirements. The applicant is responsible for complying with other agency requirements, apart from the process established in this chapter. 15.22.030 Identification, classification, and rating of Critical Areas. A. Critical Area Maps. The approximate distribution and extent of critical areas in the City are displayed on the City of Port Angeles’ critical areas maps. The maps are used to alert the public and City officials of the potential locations of critical areas and should act as a screening tool. As new information related to critical areas becomes available, the City is authorized to make changes as necessary to the critical area maps. Given the generalized nature of these maps and recognizing that critical areas and the processes that define them are dynamic, the actual presence and location of critical areas, as determined by qualified professionals and technical scientists, must be established and protected in accordance with all the provisions of this chapter, which must govern the treatment of proposed development sites. If any of the critical areas shown on the maps conflict with the criteria set forth in this chapter, the criteria must control the designation of the critical area. B. Actual Site Conditions. Regardless of whether a critical area is shown on the critical areas map, the actual presence or absence of the features defined in this code as critical areas will govern. The exact location of the boundary of a critical area must be determined through the performance of a field investigation as performed by a qualified professional, applying the definitions and criteria provided in this chapter, as determined necessary by the City. C. Classification and Rating. To promote consistent application of the standards and requirements of this chapter, critical areas within the City will be rated or classified using best available science according to their characteristics, functions and values, and/or their sensitivity to disturbance. 1. Classification of critical areas will be determined by the City using the following tools: a. Application of the criteria contained in these regulations; b. Consideration of the critical area reports submitted by qualified professionals in connection with applications subject to these regulations; and c. Review of maps and other resource adopted pursuant to this chapter. 2. Rating categories will not change due to illegal modifications of the critical area or its buffer. If the development proposal site contains or is within a critical area or buffer suspected of illegal modifications, the rating will be based on pre-modification conditions. Abatement of the unauthorized modification will be required prior to authorization of the current development proposal being processed for the subject site. 15.22.040 Protection of Critical Areas and Best Available Science. A. Critical areas and their required buffers may not be altered except as otherwise provided by this chapter. B. Any action taken pursuant to this chapter must result in equivalent or greater functions and values of the critical area associated with the proposed action, as determined by the best available science. No activity or use may be allowed that results in a net loss of the functions or values of critical areas. 18November 4, 2026 G - 111 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 C. All permitted actions and development must be designed and constructed in accordance with mitigation sequencing per PAMC 15.22.12 to achieve no net loss of critical area functions and values. D. Applicants must first demonstrate an actual inability to avoid or minimize impacts before restoration and compensation of impacts will be allowed. E. Any individual critical area adjoined by another type of critical area must have the buffer and meet the requirements that provide the most protection to the critical areas involved. F. Violations of this chapter must be subject to the enforcement provisions of the Port Angeles Municipal Code. 15.22.050 Project evaluation. A. As part of the review, the City will: 1. Verify the information submitted by the applicant is complete and accurate; 2. Evaluate the project area and vicinity for any potential critical areas; 3. Determine whether the proposed project is likely to impact the functions or values of critical areas; and 4. Determine if the proposed project adequately addresses the impacts and follows the proper mitigation sequence to avoid, minimize, and mitigate the impacts. B. If the proposed project is within, adjacent to, or is likely to impact a critical area, the City will: 1. Require a critical area report from the applicant that has been prepared by a qualified professional, to be reviewed and evaluated; 2. Determine whether the development proposal conforms to the purposes and performance standards of this chapter, including the criteria in PAMC 15.22.060, Critical Areas Review; 3. Assess the potential impacts to the critical area and determine if they can be avoided or minimized; and 4. Determine if any mitigation proposed by the applicant is sufficient to protect the functions and values of the critical area, and the public health, safety, and welfare concerns consistent with the goals, purposes, objectives, and requirements of this chapter. C. The City may require third party review of any critical area report at the expense of the applicant. 15.22.060 Critical areas review. A. When required. A proposal to modify any critical area and/or the associated buffer including, but not limited to, clearing, grading, draining, removal or alteration of vegetation, construction of structures, utilities and related infrastructure, must require a critical area permit unless it qualifies as an exemption as provided in PAMC 15.22.070. Except that, for within shoreline jurisdiction, administration of this chapter must be through the Shoreline Master Program and the appropriate shoreline permit administration process set forth in PAMC Chapter 15.08. B. Best Management Practices. All activities, including those allowed without critical areas review, must be conducted using the best management practices appropriate for that activity that result in the least amount of impact to the critical area. Best management practices must be used for tree and vegetation protection, construction management, erosion and sediment control, water quality protection, and regulation of chemical applications to ensure the activity does not result in degradation to the critical area. Any incidental damage to, or alteration of, a critical area and/or buffer must be restored, rehabilitated, or replaced at the responsible party’s expense. C. Modifications to existing nonconforming structures and uses. Existing structures, activities, and uses that were established legally but do not meet the current critical area, buffer, or buffer setback requirements 19November 4, 2026 G - 112 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 may continue in accordance with PAMC 17.95, nonconforming situations. The burden of proof is on the applicant to bring evidence in support of their position. The following modifications are allowed: 1. Routine maintenance and repairs; 2. Structural modifications or additions that do not intensify the nonconformity of the structure or increase the area of hardscape within the critical area or buffer. The Director may, at their discretion, require an updated critical area report to confirm locations of buffers and that the modification is located entirely outside the critical area or buffer; 3. Vertical additions above the ground floor that do not encroach further into the critical area or buffer beyond the existing exterior walls, except for additions in geologically hazardous areas that warrant further critical areas review. 4. Restoration or replacement of a structure that is damaged by fire or other natural disaster, except that critical areas review is required when located in a geologically hazardous area or buffer, when: a. A complete application for reconstruction or replacement is submitted within one year of the damage; and b. The restoration or replacement is made to conform to the current critical areas regulations, or if such regulations cannot be physically met without reducing the size of the structure, the restoration or replacement may not intensify any nonconformity that existed prior to the damage. 5. The demolition of structures located within critical areas or their buffers is permitted, excluding demolition of structures necessary to support or stabilize landslide or erosion hazard areas, subject to approval of a demolition permit, and a stormwater pollution prevention plan consistent with the adopted stormwater management manual. 15.22.070 Exempt activities. A. General requirements for all exempt activities. Activities listed in this section are exempt from the remaining provisions of this chapter only if they meet the specific terms of this section. B. To be exempt from this chapter does not give permission to degrade a critical area or buffer or to ignore risk from natural hazards. All exempt activities must use reasonable methods to avoid potential impacts to critical areas and buffers. In every instance, disturbance to the critical area or buffer must be minimized through best management practices and the use of low-impact equipment. C. Any incidental damage to, or alteration of, a critical area or buffer that is not a necessary outcome of the exempted activity must be restored, rehabilitated, or replaced at the responsible party’s expense and will require the submittal of an approved mitigation plan. D. This chapter may not exempt an activity from the provisions of other city permits such as clearing and grading, or agency permit requirements such as a WDFW Hydraulic Project Approval, or US Army Corps of Engineers regulatory requirements. E. The burden of proof is on the applicant to bring forth evidence that the activity meets the precise description of the exemption pursuant to this section. F. The following activities are exempt from the provisions of this chapter, provided they meet the precise description stated herein. No further critical areas review is required. 1. Emergencies. Those activities necessary to prevent an immediate threat to public health, safety, or welfare or that pose an immediate risk of damage to private property that require remedial or preventative action in a timeframe too short to allow for compliance with the requirements of this chapter, if the following requirements are met: 20November 4, 2026 G - 113 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 a. Only the minimum intervention necessary to reduce the risk to public health, safety, or welfare and/or the imminent risk of damage to private property may be authorized by this exemption. b. The alteration undertaken must be reported to the Director no later than 14 days after the alteration has occurred. Failure to report the alteration in the time allotted will result in an unauthorized critical area modification pursuant to section 15.22.190. The Director will confirm that an emergency existed and determine what, if any, additional permits and/or measures are required of the property owner to protect the critical area(s) consistent with the provisions of this chapter, and to mitigate any damage to a pre-existing state. c. After the emergency, the person or agency undertaking the action must fully fund and conduct necessary site evaluations and critical area reports, mitigation plans, and restoration for any impacts to the critical area and buffers resulting from the emergency action pursuant to the review procedures of this chapter. Mitigation activities must be initiated within one year of the date of the emergency or as directed by the Department. d. If the Director determines that the action taken, or any part of the action taken, was beyond the scope of an allowed emergency action, or any required mitigation, the Director may take action to enforce the provisions of this chapter. 2. Landscape and garden maintenance. Maintenance of existing, lawfully established landscaping and gardens within a regulated critical area or its buffer including, but not limited to, cutting, mowing, weeding and hand removal of noxious and invasive species, harvesting and replanting of garden crops, pruning and planting of non-invasive ornamental vegetation or indigenous, native species to maintain the general condition and extent of such areas, provided that these maintenance activities do not further expand into critical areas or associated buffers, do not alter topography, do not destroy or clear native vegetation, do not remove non-hazard trees, and do not diminish water quality or quantity. Tree topping is considered a destructive vegetation practice and is not exempt. a. Native growth protection area, vegetation conservation areas, mitigation sites, or other areas protected via permit conditions, conservation easements, or similar restrictive covenants are not covered by this exemption. 3. Passive outdoor activities. Low impact activities such as hiking, kayaking, fishing, bird watching, photography, education, or scientific research that do not involve modifying the land or vegetation, and that will not adversely affect the functions and values of the critical area or its buffer. 4. Trail maintenance. Maintenance, operation, repair, modification, or replacement of existing trails and trail-related facilities within publicly improved parks and recreation areas may be performed subject to the following: a. The activity does not involve the material expansion of facilities, disturbance to adjacent areas is minimized, and disturbed areas must be immediately restored; b. Work is conducted using best management practices; c. Biological characteristics of the critical area and its buffer are not impaired and adverse impacts are minimized; d. Where trail relocation is the least impactful method of repair, trail relocation, provided it is further away from the critical area, is not considered a new trail, but is included in the exemption for operation, maintenance, repair, or replacement. 5. Forest practices regulated by the State. Forest practices regulated and conducted in accordance with the provisions of Chapter 76.09 RCW and forest practices regulations, Title 222 WAC, except for conversions to non-forestry uses. 15.22.080 Allowed uses or activities. 21November 4, 2026 G - 114 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Applicability. Allowed uses or activities are those uses or activities that are unlikely to result in an impact to the critical area or its buffer because of other regulations or previous reviews. The following activities are exempt from the critical areas review process, but not the protection standards set forth in this chapter; provided that the activity or use is conducted in accordance with the applicable standards noted below. 1. All allowed activities must use mitigation sequencing and best management practices that result in the least amount of impact to the critical areas where practicable. Designation as an allowed activity does not give permission to degrade a critical area or ignore risk from natural hazards. Best management practices must be used for tree and vegetation protection, fish and wildlife protection, and regulation of chemical applications, all of which may be monitored by the City to ensure the activity does not result in degradation to the critical area or buffer. Any incidental damage to, or alteration of, a critical area that is not a necessary outcome of the allowed activity must be restored, rehabilitated, or replaced at the responsible party’s expense within one year of the disturbance to the satisfaction of the Director. 2. The applicant must provide the Director with an exemption request letter including drawings, plans, or other necessary documentation to determine whether additional City permits or approvals are needed to conduct the work. The letter must be submitted along with a critical area exemption application. 3. Unless otherwise specified, approvals will be valid for one (1) year per activity allowed; provided that there is no change in the scope of the project, including, but not limited to, the location and/or extent of the activity allowed under the notification process. 4. Upon receipt of the application, the Director may condition and provide guidance on best management practices for tree and vegetation protection, construction management, erosion and sediment control, water quality protection, and use of chemical applications to be used in the execution of the following activities: a. Site investigation. Minimal site investigative work and studies necessary for land use submittals, such as surveys, soil logs, percolation tests, water quality studies, scientific research, wildlife studies, and other related activities, where such activities do not require construction of new roads, removal of native trees or shrubs, and only minimal amounts of excavation and disturbed areas that must be immediately restored. b. Projects previously reviewed for critical areas impacts. Development permits and approvals that involve both discretionary land use approvals and construction approvals that do not need to undergo a new critical areas review. c. Minor additions to and modifications of existing structures. Existing structures or improvements that do not meet the requirements of this chapter may be remodeled, reconstructed, or replaced provided that the new construction does not further disrupt the critical area or its buffer. d. Activities within the improved right-of-way. Replacement, modification, installation, or construction of utility facilities, lines, pipes, mains, equipment or appurtenances, when such facilities are located within the improved portion of the public right-of-way or a city authorized private roadway. Any activity that alters a wetland or watercourse or that may result in the transport of sediment or increased stormwater runoff must result in; i. Increased buffer widths equal to the width of the right-of-way improvement, including disturbed areas; and ii. Retention and replacement of native vegetation or non-invasive, non-native vegetation along the right-of-way and resulting disturbance. e. Operation, maintenance, or repair. The operation, maintenance, or repair of existing structures or infrastructure, provided the activity does not alter or increase impacts to critical areas and there is no increased risk to life or property. 22November 4, 2026 G - 115 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 f. Minor utility projects. Utility projects with minor or short-duration impacts to critical areas and no significant impact on the function or values of a critical area, provided such projects are constructed with best management practices and additional restoration measures. Such allowed minor utility projects must meet the following criteria: i. There is no practical alternative with less impact on the critical area; ii. The activity involves the placement of a small utility facility such as a street sign or pole; and iii. The activity involves disturbance of an area less than seventy-five (75) square feet of the critical area and/or its associated buffer. g. Public and private pedestrian trails. Except for wetlands and fish and wildlife habitat conservation areas or their buffers, new public and private pedestrian trails must be allowed pursuant to the following criteria: i. Trails and related facilities must, to the extent feasible, be placed on existing levees, road grades, utility corridors, or any other previously disturbed areas; ii. Trails and related facilities must be planned to avoid or minimize the removal of trees, shrubs, snags, and important wildlife habitat. When trees must be removed, a replacement plan must be developed in accordance with the requirements of this chapter; iii. Trail construction and maintenance must follow best management practices and minimize the use of impervious surface; iv. The trail surface must meet all other local, state, and federal requirements, including stormwater regulations. In areas where impervious trails and paths are used, permeable pavement must be used where feasible and must have a maintenance plan in place; and v. Trails proposed in geologically hazardous areas must be constructed to not increase the risk of landslide or erosion in accordance with an approved geotechnical report prepared by a qualified professional. h. Vegetation management practices. The following vegetation management practices within critical areas and their buffers are allowed: i. Removal of noxious weeds or invasive vegetation, as identified by the Washington State or Clallam County Noxious Weed Control Board with hand labor and light equipment. Chemical applications of herbicides may be used in accordance with the state Department of Fish and Wildlife Management Recommendations, the state Department of Agriculture, and the US Environmental Protection Agency; ii. Vegetation management consistent with a previously approved mitigation, restoration, remediation, or habitat enhancement project, provided that increased erosion, landslide, or other adverse impacts to the critical area do not result. Previously approved plans are valid for a maximum of five (5) years and must reference the best available science when prepared; iii. Non-destructive pruning and trimming of vegetation for maintenance purposes, provided the trees are not located in a landslide or erosion hazard area, and that best management practices consistent with the American National Standards Institute (ANSI) are utilized. Tree topping is considered a destructive practice and is not allowed; iv. Thinning of limbs of individual trees to provide for viewshed enhancement that will not harm tree health or vigor, using the pruning specifications set forth in the City of Port Angeles Urban Forest Management Plan and in accordance with ANSI tree pruning standards. Tree topping is considered a destructive practice and is not allowed. Any work 23November 4, 2026 G - 116 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 that is found to be non-compliant with the provisions of this chapter will be subject to mitigation pursuant to the requirements in PAMC 15.22.140; and v. Vegetation removal or pruning must be done in a manner that minimizes disturbance and prevents adverse effects on soil stability, fish and wildlife habitat, water quality, or water quantity. i. Removal of hazard trees. Trees that pose a threat to life, public safety, or private or public infrastructure, as demonstrated by an ISA Certified Arborist with valid Tree Risk Assessment Qualification credentials, may be removed from critical areas or their buffer. The Arborist must prepare a report to be submitted with the application that addresses the following: i. A site plan identifying the location of the hazard tree(s) and their proximity to the critical area and any nearby targets; ii. A conclusion that the condition of concern constitutes a high risk to the targets identified or a threat to life or property; iii. Recommendations for mitigating the risk and what the residual risk is for each target identified. Creation of a habitat snag is preferred over full tree removal, where and when feasible; iv. If a tree to be removed provides critical habitat, such as an eagle perch or occupied nest, a qualified professional must be consulted to determine timing and methods of removal that will minimize and mitigate impacts; v. If a tree to be removed is within a geologically hazardous area or buffer, an evaluation of potential impacts on slope stability must be accompanied by a qualified professional, including recommendations for avoiding adverse impacts to slope stability. vi. A restoration plan for any removed tree or vegetation that includes species, size, and a maintenance plan. Trees and vegetation must be replaced at a 2:1 ratio using appropriate native species suitable to the project site. At a minimum, 50 percent of the replacement trees must be evergreen species. 15.22.090 Permitted uses or activities. A. Applicability. Uses permitted on properties which contain an area classified as a critical area must be the same as those permitted in the underlying zone. Each use must be evaluated in accordance with the review process required for the proposed use in the underlying zone in conjunction with the requirements of this chapter, state, and federal regulations. Nothing in this chapter is intended to preclude reasonable use of property. B. Review process. 1. A Type II critical area development permit is required for all permitted uses or activities, consistent with Chapter 18.02 PAMC. No permit may be issued unless it can be shown that the proposed development is fully consistent with the requirements of this chapter. The burden of proof is on the applicant to bring forth evidence in support of the application and upon which any decision has to be made on the application. 2. In addition to other project-related documents, all permitted land uses and developments proposed in an area listed, identified, inventoried, classified, or rated as a critical area must require supporting reports or studies, prepared by a qualified professional to describe the environmental limitations of the site, consistent with the requirements of sections 15.22.110 and 15.22.120 PAMC. 3. No construction activity, including clearing and grading, may be permitted until the information required by this chapter is reviewed and approved by the City as adequate. 24November 4, 2026 G - 117 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 C. In addition to the uses permitted in the underlying zone, the following land uses, activities, or developments are permitted pursuant to the requirements of this chapter. 1. Buffer modifications. An applicant may apply for buffer modifications including increased buffer width, buffer averaging, and buffer alterations of critical areas as described specifically by this chapter. 2. Previously altered critical areas. If any portion of a critical area or its associated buffer has been altered from its natural state, the applicant may propose to develop within the altered area pursuant to the following decision criteria: a. The critical area was lawfully altered in accordance with the provisions of this chapter and any state and federal laws at the time the alteration occurred; b. The previous alteration has significantly disrupted the natural functions and values of the critical area; c. The new alteration does not further disrupt the natural functions and values of the critical area; d. The proposal uses to the maximum extent possible the best available construction, design, and development techniques which result in the least adverse impact on the critical area; and e. The proposal is consistent with the purpose and intent of this chapter and incorporates all other development standards of this chapter stated herein. 3. Drainage facilities. Streams or wetlands and their buffers may be altered for use as a drainage facility provided that all requirements of the City of Port Angeles Stormwater Management Plan and all other local, state, and federal laws are satisfied, and so long as increased natural resource functions are achievable and the benefits outweigh any lost resource. The Director may approve drainage facilities in these areas only where they determine that long-term impacts are minimal or where there are no practicable or reasonable alternatives and mitigation is provided. 4. Utility location by a public agency or utility district. Every attempt must be made to avoid locating utilities within critical areas and their buffer. The Director may approve the siting of new public utilities in critical areas pursuant to the following criteria: a. There is no other practical alternative to the proposed development with less impact on the critical areas. b. The application of the critical area regulations would unreasonably restrict the ability to provide utility services to the public. c. The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site. d. The proposal attempts to protect and mitigate to the critical area functions and values consistent with the best available science. e. The proposal is consistent with other applicable regulations and standards. f. Stream crossings, whether for access or utility purposes, must be avoided to the extent possible; but when necessary due to the lack of feasible alternatives, crossing of streams must follow all applicable local, state, and federal laws and the following criteria: i. Bridges are required for streams which support salmonids, unless otherwise allowed by the Washington State Department of Fish and Wildlife; ii. All crossings using culverts must use superspan or oversize culverts; iii. Any work within the stream channel must be constructed and installed per the requirements of an applicable State hydraulics permit; iv. No work within the stream channel may occur in salmonid spawning areas; 25November 4, 2026 G - 118 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 v. Bridge piers or abutments must not be placed in either the floodway or between the ordinary high water marks unless no other feasible alternative placement exists; vi. Crossings must not diminish flood-carrying capacity; vii. Crossings must provide for routine maintenance of culverts, bridges and utilities; and viii. Crossings must serve multiple properties whenever possible. 15.22.100 Reasonable use exceptions. Exceptions to the development restrictions and standards set forth in this chapter may be permitted by application to the Director of Community and Economic Development. Reasonable use exceptions must be processed as a Type III permit pursuant to the provisions of this section and Chapter 18.02 PAMC, with a final decision made by the Hearing Examiner after reviewing the recommendation of the Director. A. Reasonable use development exceptions. An applicant may propose a reasonable use development exception only if all economic use of a property would otherwise be denied, pursuant to the following criteria: 1. The proposal is limited to the minimum necessary to fulfill reasonable use of the property, and there is no other reasonable economic alternative; 2. The proposal is compatible in design, scale, and use with other development or potential development in the immediate vicinity of the subject property in the same zone and with similar site constraints; 3. The proposal utilizes to the maximum extent possible the best available construction, design, and development techniques which result in the least adverse impact on the critical area or areas based on the best available science; 4. The proposal is consistent with the purpose and intent of this chapter and will result in no net loss of ecological functions and values of the critical area consistent with the best available science; 5. When the functions and values of the critical area or its buffer will be disrupted, the applicant has prepared a mitigation plan per the requirements in PAMC 15.22.130 to offset losses. 6. In geologically hazardous areas, a reasonable use exception may only be granted if a qualified professional has determined that the development will not pose a threat to public safety or property. B. Critical area variance. The city may approve or approve with modifications of conditions and application for a critical area variance if all the following criteria are satisfied: 1. Special circumstances exist that are particular to the land, the lot, or something inherent in the land, and that are not applicable to other lands subject to the provisions of this chapter; and 2. The proposed development does not pose a threat to adjacent property or to public health and safety; and 3. Any proposed modification to a critical area will be evaluated through consideration of a critical area report and mitigation plan prepared by a qualified professional pursuant to the requirements of this chapter, and will be the minimum necessary to allow reasonable and economically viable use of the property. The report and mitigation plan must be prepared using best available science; and 4. Mitigation sequencing per PAMC 15.22.130 has been applied, and the proposal mitigates impacts to the critical area or buffer on site to the maximum extent possible, while still allowing reasonable use of the lot. Off-site mitigation may only be utilized when deemed necessary to achieve no net loss of ecological functions and values; and 5. The variance will not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and land use district in which the subject property is located; and 6. The granting of the variance is consistent with the general purpose and intent of the City of Port Angeles Comprehensive Plan, Climate Resiliency Plan, and other applicable planning policies. 26November 4, 2026 G - 119 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE II. CRITICAL AREAS REVIEW PROCEDURES 15.22.110 Critical area report. A. Report required. All land uses and developments proposed in an area listed, identified, inventoried, classified, or rated, or likely to affect, one or more critical areas or within the required buffer, must include supporting reports or studies, prepared by a qualified professional, to describe the environmental limitations of the site. No construction activity, including clearing or grading, will be permitted until the information required by this chapter is reviewed and approved by the City as adequate. B. Critical area report sections. A critical area report must contain one or more of the following sections or report types unless exempted by the Director based on the extent of the potential impacts to the critical area or its associated buffer. The typical sequence of required sections or reports that will fulfill the requirements of this section include: 1. Reconnaissance. The existence, general location, and type of critical areas on, adjacent to, or likely to be impacted by activities on a project site. Determination of whether the project will impact or be at risk from the potential critical areas based on maximum potential buffers for the critical area type. Possible application of exemptions should also be addressed at this stage. If during site reconnaissance it is determined that the proposed development is unlikely to impact a critical area or its buffer, additional reporting may not be required; 2. Delineations. The extent, field verified boundaries, rating or classification, and applicable standard buffers of critical areas where the project area could impact the critical area or its buffer. An assessment of the characteristics of, or functions and values of the critical area and buffers must be identified; 3. Analysis. The proposal and impact assessment report documenting the potential project impacts to the critical area and buffers including a discussion of the efforts taken to avoid, minimize, and reduce potential impacts to those areas. 4. Mitigation. The measures that prevent or compensate for the potential impacts of the project designed to meet the requirements of this chapter, mitigation plan requirements defined in PAMC 15.22.13, and the standards for the specific critical area(s) impacted. Mitigation plans include, but are not limited to, habitat management plans, revegetation or replanting plans, and restoration plans; 5. Maintenance and monitoring. The goals of the mitigation proposed, performance standards for success, monitoring methods and reporting schedule, and contingency actions. Maintenance and monitoring plans must be consistent with the mitigation performance standards and requirements of this chapter, including the specific mitigation plan requirements outlined in each critical area type section. 15.22.120 Minimum report requirements. The critical area report must use scientifically valid methods and studies in the analysis of critical area data and field reconnaissance and reference the source of science used. The critical area report must evaluate the proposal and all probable impacts to critical areas and/or buffers in accordance with the provisions of this chapter. At a minimum, critical area reports must contain the following: A. The name and contact information of the applicant, a description of the proposal, and identification of the permit requested; B. A copy of the site plan for the development proposal showing: 1. The field verified location of the critical area, applicable buffer, and the development proposal with dimensions and setbacks; 27November 4, 2026 G - 120 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 2. Limits of any areas to be cleared for the proposed development, any vegetation to remain, and a description of the proposed stormwater management plan for the development and consideration of impacts to drainage alterations. C. The dates, names, and qualifications of the persons preparing the report and documentation of any site investigations performed on the site; D. Identification and characterization of all critical areas and buffers adjacent to the proposed project area; E. A statement specifying the accuracy of the report, and all assumptions made and relied upon; F. An assessment of the probably cumulative impacts to critical areas resulting from the proposed development, including a landscape-scale assessment of the affected critical area; G. An analysis of site development alternatives, if applicable; H. A description of reasonable efforts made to apply mitigation sequencing pursuant to section 15.22.130 PAMC to avoid, minimize, and mitigate impacts to critical areas and buffers; I. Mitigation plans, as needed, to ensure no net loss of functions and values, in accordance with the mitigation plan requirements in section 15.22.140 PAMC. Where feasible, applicants are encouraged to strive for net ecological gain of the impacted critical area; J. A discussion of the performance standards applicable to the critical area and proposed activity; K. Financial guarantees to ensure compliance; and L. Any additional information required for the critical area as specified in the corresponding Article. 15.22.130 Mitigation sequencing. This section applies to mitigation required for all critical area reviews, approvals, and enforcement pursuant to this chapter. This section is supplemented with specific measures under sections for particular critical area types. Mitigation for specific development proposals may include a combination of the measures below and must be designed and constructed in accordance with the provisions of this section. Before impacting any critical area or its buffer, an applicant must demonstrate that the following actions have been taken to achieve no net loss of functions and values, or where feasible, enhancement of functions and values, in the following sequential order: A. Avoiding the impact altogether by not taking a certain action or parts of actions; B. Minimizing impacts by limiting the degree of magnitude of the action and its implementation by using appropriate technology, or by taking affirmative steps, such as project redesign, relocation, or timing to avoid or reduce impacts; C. Rectifying the impact by repairing, rehabilitating, or restoring the affected environment; D. Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action; E. Compensating for the impact by replacing, enhancing, or providing substitute resources or environments; and/or F. Monitoring the impact and taking appropriate corrective measures. 15.22.140 Mitigation plan requirements. When the functions and values of a critical area or its buffer will be impacted, a mitigation plan must be prepared by a qualified professional utilizing mitigation sequencing as described in section 15.22.130 PAMC. Mitigation must be sufficient to restore impacted functions and values, or compensate for the impacted functions and values. At a minimum, the mitigation plan must consist of the following: 28November 4, 2026 G - 121 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Baseline information. Quantitative data must be collected and analyzed for both the impacted critical area and the proposed mitigation site, if different from the impacted area. B. Environmental goals and objectives. Goals and objectives describing the purposes of the mitigation measures must be provided, including a description of the site selection criteria, identification of target evaluation species, and resource functions. The goals and objectives must be related to the functions and values of the impacted critical area and consistent with the best available science. Where feasible, applicants are encouraged to strive for net ecological gain of the impacted critical area; C. Performance standards. Specific criteria for fulfilling the environmental goals and objectives, and for beginning remedial action or contingency measures must be provided, including water quality standards, species richness and diversity targets, habitat diversity indices, or other ecological, geological, or hydrological criteria; D. Detailed construction plan. Written specifications and descriptions of mitigation techniques must be provided, including the proposed construction sequence, accompanied by detailed site diagrams and blueprints that are an integral requirement of any development proposal. E. Monitoring program. A program outlining the approach for assessing a completed project must be provided, including descriptions or proposed experimental and control site survey or sampling techniques. A monitoring protocol must be included outlining how the data will be evaluated by agencies that are tracking the progress of the mitigation project. Updates must be submitted at least twice-yearly documenting milestones, successes, issues, and contingency actions of the restoration or compensation project, for a minimum of two years as required by the Director. F. Contingency plan. A plan must be provided fully identifying potential courses of action and any corrective measures to be taken when monitoring or evaluation indicates project performance standards are not being met. G. Performance and maintenance securities. Securities ensuring fulfillment of the mitigation project, monitoring program, and any contingency measures must be posted pursuant to section 15.22.180 PAMC. 15.22.150 Critical area tracts. As a condition of any permit issued pursuant to this chapter, the permit holder may be required to create a separate critical area tract or tracts containing the areas determined to be a critical area in field investigations performed pursuant to this chapter. Critical area tracts are legally created tracts containing critical areas and their buffers that must remain undisturbed in perpetuity. Critical area tracts are an integral part of the lot in which they are created, are not intended for sale, lease or transfer, and must be included in the area of the parent lot for purposes of subdivision methods and zoning regulations. A. Legal protection of critical area tracts. When the Director of Community and Economic Development requires the creation of a critical area tract as a condition of any permit issued pursuant to this chapter, the critical area tract or tracts must be protected by one of the following methods to be determined by the Director of Community and Economic Development: 1. Easement. The permit holder must convey an irrevocable offer to dedicate to the City of Port Angeles, or other public or non-profit entity specified by the Director of Community and Economic Development, an easement for the protection of the critical area; or 2. Deed restriction. The permit holder must establish and record a permanent and irrevocable deed restriction on the property title of all lots containing a critical area tract or tracts created as a condition of any permit. Such deed restriction(s) must prohibit in perpetuity the development, alteration, or disturbance of vegetation within the critical area tract, except for purposes of habitat enhancement as part of an enhancement project which has received prior written approval from the City of Port Angeles and any other agency with jurisdiction over such activity. The deed restriction must also contain the following language: 29November 4, 2026 G - 122 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 "Before beginning, and during the course of any grading, building construction, or other development activity on a lot or development site subject to this deed restriction, the common boundary between the area subject to the deed restriction and the area of development activity must be fenced or otherwise marked to the satisfaction of the City of Port Angeles". Additional note. The following note must appear on the face of all plats, short plats, PRDs, or other approved site plans containing separate critical area tracts and must be recorded on the title of record for all affected lots: "NOTE: All owners of lots adjoining separate critical area tracts identified as critical area easements or protected by deed restriction are responsible for maintenance and protection of the tracts. Maintenance includes ensuring that no alterations occur within the separate tract and that all vegetation remains undisturbed for other than natural reasons, unless the express written authorization of the City of Port Angeles has been received." B. Identification of critical area tracts. The common boundary between a separate critical area tract and the adjacent land must be permanently identified. 1. Signs. Identification must include permanent signs available from the Planning Division. Sign locations, wording, and size specifications must be approved by the Director of Community and Economic Development. 2. Fencing. The Director of Community and Economic Development may require permanent fencing for the purpose of delineating the critical area tract or tracts. C. Maintenance of critical area tracts. Responsibility for maintaining critical area tracts must be held by either the property owner, a homeowners' association, adjacent lot owners, the permit applicant or designee, or other appropriate entity as approved by the Director of Community and Economic Development. 15.22.160 Field identification and markings. A. Temporary field marking during construction. The outer perimeter of the critical area buffer and the clearing limits identified by an approved permit or authorization must be marked in the field with temporary “clearing limits” fencing in such a way as to ensure that no unauthorized intrusion will occur. This temporary marking and fencing must be maintained throughout development and may not be removed until permanent fencing and/or signs, if required, are installed. B. Permanent field marking. The decision maker may require installation of permanent signs, markers, and fencing along the outer perimeter of a critical area or its buffer when it is determined necessary to protect the critical area’s functions and values. Permanent fencing must be installed prior to final project approval or occupancy, as determined by the decision maker, consistent with the criteria in 15.22.150 PAMC. C. Maintenance and replacement. It is the responsibility of the landowner, successors, or as otherwise assigned to maintain in perpetuity and replace, if necessary, all permanent fencing and field markings. 15.22.170 Development plan review, monitoring, and inspections. A. The Director may require third party project building and development plans be reviewed by a qualified professional for confirmation of consistency with the critical area report and recommendations prior to approval of construction plans. B. The Director may require monitoring by a qualified professional during development activities within, or adjacent to, critical areas or buffers and/or a final inspection report by the qualified professional stating that development has or has not implemented the conditions design specifications provided in the project’s critical area report, and evaluation of any deviation from the recommendations. C. When the Director determines that such services are necessary to demonstrate compliance with the provisions of this chapter, they will be at the applicant’s expense. 15.22.180 Financial guarantee requirements. 30November 4, 2026 G - 123 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Performance securities. The Director of Community and Economic Development may require the applicant of a development proposal to post a cash performance bond or other acceptable security to guarantee that the applicant will properly construct all structures and improvements as required by this chapter. The security must guarantee that the work and materials used in construction are free from defects. All securities must be on a form approved by the Director of Community and Economic Development. Until written release of the security, the security may not be terminated or canceled. The Director of Community and Economic Development must release the security upon determining that all structures and improvements have been satisfactorily constructed and upon the posting by the applicant of a maintenance security if one is required. B. Maintenance securities. The Director of Community and Economic Development may require the applicant to post a cash maintenance bond or other acceptable security guaranteeing that structures and improvements required by this chapter satisfactorily perform for a minimum of two years. This requirement must also apply in the case of required mitigation improvements. All securities must be on a form approved by the Director. Until written release of the security, the principal or surety may not be terminated or canceled. The Director must release the security upon determining that performance standards established for evaluating the effectiveness and success of the structures and improvements have been satisfactorily met. The performance standards must be approved by the Director and contained in the mitigation plan developed and approved during the review process. C. Renewable bonds. Any bonds required by this section may be in the form of one-year bonds to be renewed as appropriate. 15.22.190 Unauthorized critical area modifications. A. When a critical area of its buffer has been altered in violation of this Chapter, all ongoing development work must stop, and the critical area must be restored. Violations of this chapter are subject to the enforcement provisions of the Port Angeles Municipal Code at the owner’s or other responsible party’s expense to compensate for violation of provisions of this chapter. B. Requirement for restoration plan. All unauthorized development work must remain stopped until a restoration plan is prepared and approved by the Director of Community and Economic Development. Such a plan must be prepared by a qualified professional for the applicable critical area using currently accepted scientific principles and must describe how the actions proposed meet the minimum requirements of a mitigation plan as described in section 15.22.140. The Director may, at the owner’s or other responsible party’s expense, seek expert advice in determining the adequacy of the plan. Inadequate plans will be returned to the applicant or other responsible party for revision and re-submittal. 15.22.200 Final decision and appeals. A. Final decisions. All project permit determinations made pursuant to this chapter must be final concurrent with the final decision to approve, condition, or deny the underlying permit for the development proposal or other activity involved unless appealed pursuant to PAMC 18.02.220 and 18.02.230. B. Appeals. Any decision to approve, condition, or deny a development activity proposal or other activity based on the requirements of this chapter may be appealed pursuant to PAMC 18.02.220 and 18.02.230. CHAPTER 15.24 Wetlands Protection (MOVED TO CHAPTER 15.22) This chapter is hereby deleted in its entirety and moved to a new chapter 15.22 for replacement. 31November 4, 2026 G - 124 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE III. Wetlands 15.22.210 Purpose A. The purpose of this article is to recognize and protect the many beneficial ecological functions and social services wetlands provide through regulated site planning to avoid or minimize impacts to wetlands wherever possible, to require that activities not dependent upon a wetland location be located in upland sites, and to achieve no net loss of the ecological functions and values wetlands provide through compensatory mitigation to offset losses which are unavoidable. B. This article is intended to be consistent with the requirements of Chapter 36-70A RCW and to implement the goals and policies of the City’s Comprehensive Plan, Climate Resiliency Plan, and Strategic Plan for protecting wetlands. 15.22.220 Identification, delineation, and rating. A. Identification. All areas that meet the criteria in the definition of a wetland consistent with RCW 36.70A.030 will be identified as critical areas and are subject to the provisions of this chapter. Wetlands are dynamic systems that can change over time; as such, delineations must be performed to adequately identify wetlands and their buffers. B. Delineation. The exact location of a wetland’s boundary must be determined through the performance of a field investigation by a qualified wetland professional using the latest version of the approved federal wetland delineation manual and regional supplements. Evidence documenting the results of the boundary survey, including evidence of a lack of wetland indicators if no wetlands are identified, must be submitted to the City with any development application. 1. The delineation should result in a wetland boundary clearly marked in the field and an accurate ground-verified map of the boundaries. The map should be created using either a professional survey or using an equivalent method such as GPS with sub-meter accuracy. The map should also include an indication of where wetlands exist off-site, when feasible. 2. Wetland delineations are valid for five (5) years; after such date, the City will determine if a revision or additional assessment is necessary. C. Rating. Wetlands must be rated according to the Washington Department of Ecology wetland rating system, as set forth in the Washington State Wetland Rating System for Western Washington: 2014 Update (Version 2), and as revised. The wetland categories determined by the rating are as follows: 1. Category I. Category I wetlands are: a. Relatively undisturbed estuarine wetlands larger than one acre; b. Wetlands of high conservation value that have been identified by scientists from the Washington Natural Heritage Program due to the presence of rare species or a rare or high-quality ecosystem type; c. Bogs; d. Wetlands with mature and old-growth forests over one acre in size; e. Wetlands in coastal lagoons; and f. Wetlands that perform many functions well, scoring a 23 or higher on the questions related to functions in the wetland rating form. These wetlands are those that represent a unique wetland type, are more sensitive to disturbance than most wetlands, or are relatively undisturbed and contain ecological attributes that are impossible to replace within on human lifetime. 2. Category II. Category II wetlands include: 32November 4, 2026 G - 125 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 a. Estuarine wetlands smaller than one acre in size, or disturbed estuarine wetlands larger than one acre; b. Wetlands that score between 20 – 22 points on the questions related to functions on the wetland rating form. 3. Category III. Category III wetlands are: a. Wetlands with a moderate level of functions, scoring between 16-19 points on the wetland rating form; and b. Can often be adequately replaced with a well-planned mitigation project. 4. Category IV. Category IV wetlands are often heavily disturbed and have the lowest levels of functions, scoring less than 16 in the wetland rating. D. Illegal modifications. When a violation occurs, wetland rating categories do not change due to illegal modifications or alterations. A wetland’s category must be based on the pre-violation condition of the wetland. 15.22.230 Regulated and allowed activities. A. Regulated activities. All development activities and uses are prohibited in wetlands and wetland buffers, unless administered through the permit procedures established in this chapter, and only when it is demonstrated that the activity or use will not result in a net loss of ecological functions and values of the wetland through the application of mitigation sequencing as demonstrated in a critical area report. The following activities are regulated unless otherwise exempted by PAMC 15.22.070 if they occur in a wetland or its buffer: 1. The removal, excavation, grading, or dredging of soil, sand, gravel, minerals, organic matter, or material of any kind; 2. The dumping of, discharging of, or filling with any material; 3. The draining, flooding, or disturbing of the water level or water table; 4. Pile driving; 5. The placing of obstructions; 6. The construction, reconstruction, demolition, or expansion of any structure; 7. The destruction or alteration of wetland vegetation through clearing, harvesting, shading, intentional burning, or planting of vegetation that would alter the character of a regulated wetland, provided that these activities are not part of a forest practice governed under Chapter 76.09 RCW and its rules; 8. Activities that result in a significant change of water temperature, a significant change of physical or chemical characteristics of wetland water sources, including quantity, or the introduction of pollutants; 9. Land divisions and land use permits that contain regulated wetlands or their buffers or, that may impact a regulated wetland or its buffer, must comply with the following procedures and development standards: a. Land that is located wholly within a wetland and/or its buffer may not be subdivided; b. Land that is located partially within a wetland or its buffer may be subdivided; provided, that an accessible and contiguous portion of each new lot: i. Is located outside of the wetland and its buffer, and ii. Meets the minimum lot size requirements of the underlying zone as defined in Title 17. 33November 4, 2026 G - 126 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 c. Land division approvals must be conditioned to require that regulated wetlands and wetland buffers be dedicated as open space tracts, or as an easement or covenant encumbering the wetland and wetland buffer. Such dedication, easement or covenant must be recorded together with the land division and represented on the final plat and title; c. The use of clustered development or similar innovative site planning is strongly encouraged for projects with regulated wetlands and buffers on the project site to accommodate innovation, creativity, and design flexibility; d. After preliminary approval and prior to the final land division or other land use permit approval, the department may require that the common boundary between a regulated wetland and associated buffer and the adjacent land be identified using permanent signs and/or fencing consistent with PAMC 15.22.150 and 15.22.160. 10. Stormwater management facilities may not be located within wetland buffers, with the following exceptions: a. Conveyance systems may be located in wetland buffers on a case-by-case basis if deemed necessary and approved by the Director of Public Works and Utilities. b. Full dispersion of flow, as described in BMP T5.30 of the Department of Ecology's most current SWMMWW, may be allowed in a wetland buffer if approved by the Director of Public Works and Utilities. c. The facilities or methods specified in subsections 10.a and b of this section are allowed only if impacts to the buffer, resulting from their installation, are avoided or mitigated. 11. Stormwater management design and facilities must be consistent with PAMC Section 13.63.190, to protect wetland hydrology and wetland functions. Native vegetation enhancement in wetland buffers may be approved for both buffer enhancement and as part of a best management practice to meet low impact development stormwater standards required by the Washington State Department of Ecology. Any stormwater management facility or method associated with wetlands must meet the state requirements adopted in PAMC Section 13.63.190. B. Allowed activities. In addition to those uses or activities allowed under PAMC section 15.22.080, the following uses or activities may be allowed within a wetland or wetland buffer to the extent they are not prohibited by any other ordinance or law and provided they are conducted using best available science, except where such activities result in the conversion of a regulated wetland or buffer to a use which it was not previously subjected: 1. Conservation or preservation of soil, water, vegetation, fish, shellfish, and other wildlife that does not include changing the structure or functions of the existing wetland or buffer; 2. The harvesting of wild crops in a manner that is not detrimental to the natural reproduction of such crops and provided the harvesting does not require tilling of soil, planting of crops, or alteration of the wetland or buffer by changing existing topography, water condition or quality, or water sources; 3. Existing and ongoing agricultural activities that minimize adverse impacts to wetlands, water quality, riparian ecology, salmonid populations, and wildlife habitat. New agricultural activities or existing activities that remove trees, divert or impound water, involve excavation, ditching, draining, culverting, filling, grading, or similar activities that introduce adverse impacts to wetlands are not allowed. a. For all existing and ongoing agricultural activities, the use of best management practices as established by the Natural Resource Conservation Service (NRCS), farm conservation plans, and incentive-based programs to improve agricultural practices in and near wetlands must be used to the extent feasible. 4. The maintenance, but not creation, of existing drainage ditches; 5. Navigation aids and boundary markers; and 34November 4, 2026 G - 127 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 6. Boat mooring buoys. C. Special permit uses. Any activity or use other than those specified in this chapter may not be conducted in wetlands or wetland buffers except upon issuance of a critical area development permit by the Director of Community and Economic Development. 15.22.240 Wetland buffers. A. Standard buffer zone widths. Wetland buffer zones are required for all regulated activities adjacent to or likely to impact a regulated wetland to protect the integrity, functions and values of the wetland. The buffer standards required by this chapter presume the existence of a dense vegetation community in the buffer adequate to protect the wetland functions and values. When a buffer lacks adequate vegetation, the Director may increase the standard buffer, require buffer planting or other enhancements, and/or deny a proposal for buffer reduction or buffer averaging. Buffers may not include areas that are functionally and effectively disconnected from the wetland by an existing public or private road. Functionally and effectively disconnected means that the road stops the protective measures provided by a buffer or it disrupts the life cycle of wildlife documented to be using the area. The standard buffer widths will be based on the wetland category, the intensity of the proposed adjacent land use, and the functions or special characteristics of the wetland that need to be protected as determined through the rating system. If a wetland meets more than one of the characteristics listed, the buffer width be that of the widest one: 1. Category I Wetlands. For wetlands rated as a Category I wetland with a score for all three basic functions greater than or equal to 23 points, or having the “special characteristics” identified in the rating system, the following buffer widths apply: Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Wetlands of high conservation value or Bogs 250 190 125 Estuarine or Coastal Lagoons 200 150 100 Forested Buffer width to be based on score for habitat functions or water quality functions (below). Score of 8-9 for habitat function 300 225 150 Score of 6-7 for habitat function 150 110 75 Score of 8-9 for water quality improvement and less than 6 for habitat 100 75 50 Not meeting any of the above, but still rated as a Category I 100 75 50 2. Category II Wetlands. For wetlands rated as a Category II wetland with a score for all three basic functions of 20 – 22 points or having the “special characteristics” identified in the rating system, the following buffer widths apply: 35November 4, 2026 G - 128 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Score of 8-9 for habitat function 300 225 150 Score of 6-7 for habitat function 150 110 75 Score of 8-9 for water quality improvement and less than 6 for habitat 100 75 50 Estuarine 150 110 75 Not meeting any of the above, but still rated as a Category II 100 75 50 3. Category III Wetlands. For wetlands rated as a Category III wetland with a score for all three basic functions of 16 – 19 points, the following buffers widths apply: Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Score of 6-7 for habitat function 150 110 75 Score of 3-5 for habitat function 80 60 40 4. Category IV Wetlands. For wetland rated as a Category IV wetland scoring less than 16 points for all functions, the following buffer widths apply: Wetland Characteristics Buffer Width (feet) High Intensity Moderate Intensity Low Intensity Score for all three basic functions less than 16 points 50 40 25 B. Land use intensity. For buffer width determinations as shown above, the land use intensity rating is as follows: High Land Use Intensity Land uses including the following: commercial, industrial, institutional, conversion to high-intensity agriculture, high-intensity recreation such as golf courses or ball fields, hobby farms, and residential development with greater than 75% maximum site coverage. Moderate Land Use Intensity Land uses including the following: residential development with less than 75% maximum site coverage, moderate-intensity open space such as parks with paved trails, conversion to moderate-intensity agriculture, hobby farms, construction of logging roads associated with regulated forestry activities, and utility corridors or easements including access/maintenance roads. Low Land Use Intensity Land uses including the following: low-intensity open space activities, trails made of a pervious surface, utility corridors or easements with little or no vegetation management. 36November 4, 2026 G - 129 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 C. Increased buffer widths. The Director may require increased standard buffer widths on a case-by-case basis when a larger buffer is necessary to protect the functions and values of the wetland, based on local conditions. This determination must be supported by appropriate documentation showing that it is reasonably related to the protection of the functions and values of the regulated wetland. Such determination will be attached as a permit condition and must demonstrate that: 1. A larger buffer is necessary to maintain viable populations of existing species; or 2. The wetland is used by species proposed or listed by the Federal Government or the State as endangered, threatened, rare, monitor, or sensitive, critical or outstanding potential habitat for those species, or has unusual nesting or resting sites, such as heron rookeries or raptor nesting trees; or 3. The adjacent land is susceptible to severe erosion, and erosion control measures will not effectively prevent adverse wetland impacts; or 4. The adjacent land has minimal vegetative cover or slopes greater than 15 percent. D. Reduction of standard buffer widths. No buffer may be reduced unless buffer averaging is infeasible. The Director may reduce the standard wetland buffer width for proposed land uses with high-intensity impacts to those recommended for moderate-intensity impacts on a case-by-case basis where it can be demonstrated that: 1. For wetlands that score moderate or high for habitat (6 points or more for the habitat functions), the width of the buffer can be reduced if both of the following criteria are met: a. A relatively undisturbed, vegetated corridor of at least 100-feet wide is protected between the wetland and any other Priority Habitats as defined by the Washington Department of Fish and Wildlife. The corridor must be protected for the entire distance between the wetland and the Priority Habitat by some type of legal protection such as a conservation easement. b. Measures to minimize the impacts of different land uses on wetlands, such as the examples provided in table 15.22.240-1 below, are applied. 2. For wetlands that score less than 6 points for habitat, the buffer width can be reduced to that required for moderate land-use impacts if measures to minimize the impacts of the proposed land use are applied as provided in table 15.22.240-1. Table 15.22.240-1 Measures to Minimize Impacts on Wetlands Examples of Disturbance Activities and Uses that Cause Disturbances Measures to Minimize Impacts Lights • Parking lots • Warehouses • Manufacturing • Residential • Direct lights away from wetlands • Use of shielded light fixtures Noise • Manufacturing • Residential • Locate noise-generating activities away from wetlands Toxic runoff • Parking lots • Roads • Manufacturing • Residential areas • Large-scale use of pesticides • Landscaping and excessive fertilizer use • Route all new, untreated runoff away from wetland while ensuring the wetland is not dewatered • Apply integrated pest management and best practices 37November 4, 2026 G - 130 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Stormwater runoff • Parking lots • Roads • Manufacturing • Residential areas • Commercial • Landscaping • Retrofit stormwater detention and treatment for roads and existing adjacent development • Prevent channelized flow from lawns that directly enters the buffer Change in water regime • Impermeable surfaces • Lawns • Tilling • Infiltrate or treat, detain, and disperse into buffer new runoff from impervious surfaces and new lawns. Pets and human disturbance • Residential areas • Parks and recreation • Use privacy fencing or plant dense vegetation to delineate buffer edge and to discourage disturbance using vegetation appropriate for the ecoregion; place wetland and its buffer in a separate tract. E. Standard buffer width averaging. Standard buffer widths may be modified by averaging buffer widths to improve wetland protection or to allow for reasonable use of a parcel. 1. Averaging to improve wetland protection may be permitted when all the following conditions are met: a. The wetland has significant differences in characteristics that affect its habitat functions, such as a wetland with a forested component adjacent to a degraded emergent component or a dual- rated wetland with a Category I area adjacent to a lower rated area; b. The buffer is increased adjacent to the higher-functions area of habitat or more sensitive portion of the wetland and decreased adjacent to the lower-functioning or less sensitive portion; c. The total area of the buffer after averaging is equal to the area required without averaging; and d. The buffer is at its narrowest point is never less than 75 percent of the required width. 2. Averaging to allow reasonable use of a parcel may be permitted when all the following criteria are met; a. There are no feasible alternatives to the site design that could be accomplished without buffer averaging; b. The averaged buffer will not result in degradation of the wetland’s functions and values as demonstrated by a report from a qualified wetland professional; c. The total buffer area after averaging is equal to the area required without averaging; and d. The buffer at its narrowest point is never less than 75 percent of the required width or, 75 feet for Category I and II, 50 feet for Category III, and 25 feet for Category IV, whichever is greater. F. Measurement of buffer widths. All buffers must be measured perpendicularly from the wetland boundary as surveyed in the field. The buffer for a wetland created, restored, or enhanced as compensation for approved wetland alterations must be the same as the buffer required for the category of the created, restored, or enhanced wetland. G. Buffers on mitigation sites. All wetland mitigation sites must have buffers consistent with the buffer requirements of this chapter. Buffers must be based on the expected or target category of the proposed wetland mitigation site once the mitigation actions are taken. 38November 4, 2026 G - 131 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 H. Building setbacks from buffers. Buildings, structures, paving, and other impervious surfaces must be set back 15 feet from the edge of any wetland buffer. The setback must be identified on a site plan that is submitted with the development application. Minor intrusions into the area of the building setback may be allowed if the Director of Community and Economic Development determines that such intrusions will not negatively impact the wetland’s functions and values, or the critical root zone of trees within the buffer. The following minor intrusions into the buffer may be allowed: 1. Landscaping, provided no non-native invasive species are used in the landscaping; 2. Uncovered decks, roof eaves and overhangs, unroofed stairways and steps; 3. Pervious ground surfaces, such as driveways, patios, and parking may be allowed; provided, that they are engineered as a permeable pavement system. Such improvements may be subject to the requirements in PAMC Chapter 13.63, Stormwater – Utility and Regulations. I. Buffer maintenance. Except where otherwise specified or allowed in this accordance with this chapter, final buffer conditions must be retained in an undisturbed or enhanced condition. In the case of compensatory mitigation sites, removal of nonnative weeds may be required for the duration of the mitigation bond. J. Buffer impacts. Wetland impacts must be avoided and minimized to the greatest extent practicable. Unavoidable impacts to wetlands must be offset by compensatory mitigation to achieve no net loss of wetland functions and values. Mitigation must occur on the same site when feasible or within the same wetland system, when possible. K. Allowed buffer uses. The following uses may be allowed within a wetland buffer in accordance with the review procedures of this chapter, provided they are not prohibited by any other applicable law, and they are conducted in a manner so as to minimize the impacts to the buffer and adjacent wetland: 1. Conservation or restoration activities aimed at protecting the soil, water, vegetation, or wildlife; 2. Passive recreation facilities designed in accordance with an approved critical area report, including: a. Walkways and trails, provided that they are limited to minor crossings having no adverse impact on water quality. They should be generally parallel to the perimeter of the wetland, located only in the outer 25% of the wetland buffer area, and located to avoid removal of significant, mature, or old-growth trees. The trail surface must be limited to five (5) feet in width and designed using permeable materials for pedestrian use only. b. Wildlife viewing structures that are designed to minimize impacts to the buffer. 3. Educational and scientific research activities; 4. Normal and routine maintenance and repair of any existing public or private facilities within an existing right-of-way, provided that the maintenance or repair does not increase the footprint or use of the facility or right-of-way. 5. The harvesting of wild crops in a manner that is not injurious to natural reproduction of such crops and provided the harvesting does not require tilling of soil, planting of crops, chemical applications, or the alteration of the wetland by changing existing topography, water conditions, or water sources. 6. Drilling for utilities/utility corridors under a buffer, with entrance/exit portals located completely outside of the wetland buffer boundary, provided that the drilling does not alter the ground water connection to the wetland or percolation of surface water down through the soil column. Specific studies by a hydrologist are necessary to determine whether the ground water connection to the wetland or percolation of surface water down through the soil column would be disturbed. 7. Enhancement of a wetland buffer through the removal of non-native, invasive plant species by hand. All removed plant material must be taken away from the site and appropriately disposed of. Plants that appear on the Washington State Noxious Weed Control Board list of noxious weeds should be handled and disposed of according to a noxious weed control plan appropriate to that species. Revegetation 39November 4, 2026 G - 132 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 with appropriate native species at natural densities is allowed in conjunction with removal of invasive plant species. 8. Repair and maintenance of legally established non-conforming uses or structures, provided they do not increase the degree of nonconformity. L. Overlapping critical area buffers. If buffers for two critical areas overlap, such as buffers for a stream and a wetland, the wider buffer applies. 15.22.250 Critical area report additional requirements. Unless specifically waived by the Director of Community and Economic Development, the following information is required for any proposed use or activity in a wetland or its buffer, in addition to the minimum critical area report requirements pursuant to PAMC 15.22.120. A. A wetland report must be prepared by a qualified wetland professional. B. Wetland Report. The following areas must be addressed in the wetland report: 1. The project area of the proposed activity; 2. All wetlands identified within 300 feet of the project area; 3. The wetland rating and associated buffer for all wetlands identified within 300 feet of the project area; 4. All shorelines, floodplains, or other applicable critical areas and their associated buffers within 300 feet of the project area. 5. A wetland analysis that includes a written assessment and accompanying maps of the wetlands and buffers within 300 feet of the project area, including the following information at a minimum: a. Wetland delineation, size (acreage) and required buffers based on a professional survey from the field delineation; b. Wetland category, including a description of and score for each function, per wetland ratings PAMC 15.22.220.C; c. Cowardian classification system and vegetation class, as well as the area of each class present; d. Hydrogeomorphic class or classes; e. Soil and substrate conditions; f. Topographic elevations, at two-foot contours; g. An assessment of mitigation sequencing including avoidance, minimization, and mitigation proposed to ensure no net loss of wetland ecological functions and values, clearly identifying and describing any proposed unavoidable impacts and the compensatory mitigation planned for each impact. 15.22.260 Mitigation requirements specific to wetlands. As a condition of any permit allowing alteration of wetlands and/or wetland buffers, or as an enforcement action for illegal modifications to a wetland and/or its buffer, the applicant or violator must engage in compensatory mitigation to offset the impacts resulting from the applicant’s or violator’s actions. A mitigation plan must be developed that is consistent with the minimum plan requirements pursuant to PAMC 15.22.140 and the Wetland Mitigation in Washington State – Part 2: Developing Mitigation Plans (Ecology Publication No. 06-06-011b, Olympia WA, March 2006 or as revised). The overall goal of any compensatory mitigation project must be to achieve no net loss of wetland functions and values, and to strive for a net gain over present conditions where feasible. 40November 4, 2026 G - 133 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 A. Preference of mitigation actions. Mitigation actions must describe how the activity will improve wetland functions, environmental processes, or both, and must occur in the following order of preference after mitigation sequencing has been applied: 1. Restoration: Re-establishment of a former wetland that results in a gain in wetland area and functions through the manipulation of the physical, chemical, or biological characteristics of a site. Examples include removing fill, plugging ditches, or breaking drain tiles to restore a wetland hydroperiod, which in turn will lead to restoring wetland biotic communities and environmental processes. 2. Restoration: Rehabilitation of hydrologic processes to a degraded wetland that results in a gain in wetland function but does not result in a gain in wetland area. Examples include breaching a dike to reconnect wetlands to a floodplain or return tidal influence to a wetland. 3. Establishment (creation) of new wetland area and functions in a location where they did not previously occur. Establishment results in a gain in wetland area and functions. 4. Preservation (protection) of high-quality, at-risk wetlands when done in combination with creation and re-establishment. Preservation as the sole means of mitigation for wetland impacts may be allowed if the wetland area to be preserved meets all the following criteria: a. The preservation site is determined to be under imminent threat of destruction, adverse modification, or substantive degradation, specifically sites with the potential to experience a high rate of undesirable ecological change due to on- and/or off-site activities; b. The area proposed for protection is of high quality (scores between 20 – 27 points in the wetland rating system), or is critical to the health and ecological sustainability of the watershed or sub- basin. Some of the other high-quality features include: i. Category I or II wetlands using the most recent version of the Wetland Rating System for western Washington, including Wetlands of High Conservation Value; ii. Rare wetland types such as bogs, mature forested wetlands, estuaries, coastal lagoons, or those of high regional or watershed importance; iii. Habitat for threatened or endangered species (state, federal, or both); iv. Provides biological and/or hydrologic connectivity; v. Of regional or watershed importance as indicated in a watershed, salmon recovery, or basin plan; vi. Large size with high species diversity (plants, animals, or both), high abundance of native species, or both; vii. A site that is continuous with the head of a watershed, or with a lake or pond in an upper watershed that significantly contributes to hydrologic processes and water quality. c. The protected wetland and buffer are protected in perpetuity through a conservation easement, deed restriction, or dedication as a separate tract; d. Establishment, restoration, and enhancement opportunities have also been considered, and preservation is the best mitigation option; and e. The site includes buffer areas adequate to protect the habitat and its functions from encroachment and degradation over time. 5. Enhancement of significantly degraded wetlands in combination with restoration or creation. Such enhancement should be part of a mitigation package that includes replacing the impacted area to meet appropriate ratio requirements. Special consideration must be given to the presence of Oregon Spotted Frogs, as they often use lower-quality wetland habitats that are often dominated by reed canary grass. Examples of enhancement projects may include the following: 41November 4, 2026 G - 134 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 a. Removal of invasive species, including roots and root mats, such as reed canary grass, purple loosestrife, knotweed, or any other recognized noxious weed as identified by the Clallam County Noxious Weed Board; b. Scarification of soil and addition of organic material or other soil amendments; c. Planting trees and shrubs as an emergent wetland dominated by non-native vegetation; d. Grading to establish multiple hydrologic regimes, from long duration seasonally inundated to saturated; and e. Adding habitat features such as snags, large woody debris, brush piles, rock piles, and nest boxes. B. Compensatory mitigation locations. Under the 2008 Federal Mitigation Rule, applicants are required to use a watershed approach for compensatory mitigation to the extent appropriate and practicable. The goal is to maintain and improve the quality and quantity of aquatic resources within watersheds through strategic selection of compensatory mitigation sites, based on the following: 1. An understanding of how environmental processes, such as the movement of water, determine the characteristics and functions in a watershed; 2. Determining the extent to which the hydrologic processes, and thus the biological processes, have been altered; 3. Identifying areas where these environmental processes can be most effectively restored and where they need to be protected or maintained; and 4. Using compensatory mitigation to restore and protect those processes and replace wetland functions and types that are relatively rare or limited in the watershed due to historic losses. C. Mitigation banking. Credits from a wetland mitigation bank certified under Chapter 173-700 WAC may be used to compensate for impacts located within the service area specified in the mitigation bank instrument, if: 1. The proposal would provide appropriate compensation for the proposed impacts; 2. The impact site is located in the same service area as the bank; 3. The proposed use of credits is consistent with the terms and conditions of the certified mitigation bank instrument; and 4. Replacement ratios using bank credits are consistent with replacement ratios specified in the certified mitigation bank instrument. D. In-Lieu Fee Mitigation. Development or use of an in-lieu fee program is allowed if the program is established consistent with federal and state regulations and policies. Using credits from an approved in-lieu-fee program must be consistent with mitigation sequencing pursuant to PAMC 15.22.130. E. Mitigation Ratios. The following ratios in table 15.22.260-1 and consideration of factors described in this section must be used to determine the relative amount of created, re-established, re-habilitated, enhanced , or preserved that will be required to replace impacted wetlands. The first number refers to the amount of wetland area providing mitigation and the second refers to the amount of wetland area impacted or altered. If a mitigation bank or in-lieu-fee program is used for mitigation requirements, wetland ratios are not applied. The mitigation bank credit system or in-lieu fee program credit system, whichever applies, is used to determine the number and cost of the credits to be purchased to fulfill mitigation requirements. Table 15.22.260-1 Wetland Mitigation Ratios Creation or Re- establishment Re-habilitation Enhancement Preservation 42November 4, 2026 G - 135 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 Category I, Mature Forested Wetlands 6:1 12:1 24:1 24:1 Category I, Estuarine 4:1 8:1 Case-by-case 16:1 Category I, Coastal Lagoons 4:1 8:1 Case-by-case 16:1 Category II 3:1 6:1 12:1 16:1 Category III 2:1 4:1 8:1 10:1 (may be case- by-case) Category IV 1.5:1 3:1 6:1 Case-by-case (range from 5:1 to 10:1) 15.22.270 Performance Standards and Requirements. A. Mitigation performance standards. The performance standards in this section must be incorporated into the mitigation plans submitted to the City for impacts to wetlands and/or wetland buffers. The following standards apply to any mitigation proposed within Category I, II, III, and IV wetlands and their buffers. Modifications to these standards consistent with the guidance in “Wetland Mitigation in Washington State: Part 2 – Developing Mitigation Plans” may be considered for approval by the decision-maker as alternatives to the following: 1. Plants native to the region must be used; 2. Plant species selection must be consistent with the existing or projected hydrologic regime, including base water levels and stormwater event fluctuations; 3. Plant species selection must be consistent with the site environmental conditions, such as slope, aspect, soils, and exposure to the elements; 4. Plants should be commercially available or available from local sources. Small-form, bare-root plants are preferred over large specimens to reduce disturbance when planting; 5. Native plants species high in food and cover value for fish and wildlife should be prioritized, as appropriate, for the site; 6. Plant selection must be selected or approved by a qualified professional biologist, botanist, or ecologist; 7. A planting plan must be approved by the city; 8. Stockpiling soil and construction materials should be limited to upland areas outside of any tree protection zones, and contract specifications must limit stockpiling of materials to durations in accordance with city clearing and grading standards, unless otherwise approved by the City. 9. Irrigation must be installed or watering afforded by trucks or hoses to provide water for installed plants or seeded areas to supplement rainfall to ensure plants survive the first two years after installation. 10. All construction specifications and methods must be approved by a qualified professional and the city. The city reserves the right to inspect all ongoing work on site through project completion. 43November 4, 2026 G - 136 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE IV. CRITICAL AQUIFER RECHARGE AREAS 15.22.280 Purpose. A. Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect on aquifers used for potable water, including areas where an aquifer that is a source of drinking water is vulnerable to contamination that would affect the potability of the water, or is susceptible to reduced recharge, as defined by WAC 365-190-030. B. The purpose of this article is to protect the functions and values of groundwater by preventing pollution and maintaining supply, should the City intend to use CARAs for future public water supplies. The quality and quantity of groundwater in an aquifer is inextricably linked to its recharge area. It is the intent of this article to safeguard groundwater resources by mitigating or precluding future discharges of contaminants from new development activities and redevelopment activities. 15.22.290 Applicability and designation. A. Applicability. The provisions of this article apply to regulated facilities that are within or adjacent to those portions of the City of Port Angeles designated as critical aquifer recharge areas on the City’s critical areas map. Regulated activities or facilities are defined as those commercial, industrial, and home occupation uses that: 1. Process or handle hazardous materials in regulated quantities; and/or 2. Treat or store regulated quantities of hazardous materials. B. Designation. Critical aquifer recharge areas are those areas that include one or more of the following: 1. Areas served by groundwater which have been designated as a “sole source aquifer area” under the Federal Safe Drinking Water Act; 2. Areas designated as “wellhead protection areas” defined by the boundaries of the 10-year time of groundwater travel or boundaries established using alternate criteria provided by the Washington State Department of Health in those settings where groundwater time of travel is not a reasonable delineation criterion, in accordance with WAC 246-290-135; 3. Susceptible groundwater management areas that have been designated as moderately or highly vulnerable or susceptible in an adopted groundwater management program developed pursuant to Chapter 173-100 WAC; 4. Special protection areas defined by WAC 173-200-900; or 5. Moderately or highly vulnerable aquifer recharge areas to degradation or depletion because of hydrogeologic characteristics that are delineated by a hydrogeologic study prepared in accordance with the State Department of Ecology guidelines. 15.22.300 Regulated activities. A. Activities or uses that do not cause degradation of groundwater quality and will not adversely affect the recharging of the aquifer may be permitted in a critical aquifer recharge area, and do not require preparation of a critical area report; provided, that they comply with the City of Port Angeles stormwater management regulations and applicable state and federal regulations. These activities typically include residential, commercial, and industrial development that does not include storage, processing, or handling of any dangerous waste of hazardous substance, or other development that does not substantially divert, alter, or reduce the flow of ground or surface waters. 44November 4, 2026 G - 137 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 B. Activities that have the potential to cause degradation of groundwater quality or adversely affect the recharging of the aquifer may be permitted in critical aquifer recharge areas only in accordance with an approved critical area report and mitigation plan. These activities include, but are not limited to: 1. Aboveground/Underground Storage Tanks or vaults. The City of Port Angeles specifically regulates and authorizes permits for aboveground and underground storage tanks pursuant to the International Fire Code and this chapter. The Washington Department of Ecology also regulates and authorizes permits for underground storage tanks pursuant to Chapter 173-360 WAC. The removal of abandoned The City of Port Angeles Fire Department regulates and authorizes permits for the removal of abandoned underground storage tanks. 2. Agriculture. Agricultural uses, defined as commercial farming and animal husbandry. 3. Land Disturbing Activities. Activities that substantially divert, alter, or reduce the flow of ground or surface waters, or otherwise adversely affect aquifer recharge. 15.22.310 Critical area report additional requirements. A. For all regulated activities, the applicant must submit a report describing the best management practices to be used to minimize the risk of aquifer contamination. In addition to the minimum report requirements pursuant to PAMC 15.22.120, a critical area report for any regulated activity within a critical aquifer recharge area must contain the following: 1. A hydrogeologic assessment including, but not limited to, the following: a. Available information regarding geologic and hydrogeologic characteristics of the site, including the surface location of all critical aquifer recharge areas located on site or immediately adjacent to the site, and permeability of the unsaturated zone; b. Groundwater depth, flow direction, and gradient based on available information; c. Available well logs, borings, seeps/springs within 1,000 feet of the project area; d. Available ground and surface water quality data; e. Best management practices proposed to be used; f. Groundwater monitoring plan provisions; g. Discussion of the effects of the proposed project on groundwater quality and quantity, including predictive evaluation of groundwater withdrawal effects on nearby wells and surface water features and predictive evaluation of contaminant transport based on potential releases to groundwater h. A spill plan that identifies equipment and/or structures that could fail, resulting in an impact. Spill plans must include provisions for regular inspection, repair, replacement of structures and equipment that could fail, cleanup and disposal of all materials spilled; and i. Description of potential mitigation measures, including any sampling schedules necessary should it be determined that the proposed project may have an adverse impact on groundwater resources. 2. If the hydrogeologic assessment determines that the facility will have no effect on groundwater resources, the facility is exempt from the development standards as described in PAMC 15.22.320. 3. If the hydrogeologic assessment determined that the facility could have an effect on groundwater resources, the decision-maker will require implementation of applicable development standards in PAMC 15.22.320. 45November 4, 2026 G - 138 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 15.22.320 Protection and development standards for regulated activities. A. The following protection and development standards apply to the regulated activities and facilities in areas designated as critical aquifer recharge areas. 1. Aboveground/Underground Storage Tanks or Vaults. Aboveground/underground storage tanks or vaults for the storage of hazardous substances, animal wastes, sewage sludge, fertilizers, or other chemical or biological hazards or dangerous wastes as defined in Chapter 173-303 WAC, or any other substances, solids, or liquids in quantities identified by the Clallam County Environmental Health Division, consistent with Chapter 173-303, as a risk to groundwater quality, must be designed and constructed so as to: a. Prevent the release of such substances to the ground, ground waters, or surface waters; b. Have constructed around and under it, an impervious containment area enclosing or underlying the tank or part thereof. Impervious containment shall be greater than the volume of the storage area to avoid an overflow of the containment area; c. Provide for release detection; d. Provide written spill response and spill notification procedures to the Stormwater Division of the Port Angeles Public Works & Utilities Department; e. Use material in the construction or lining of the storage containment area which is compatible with the substance to be stored to protect against corrosion or leakage or otherwise designed in a manner to prevent the release or threatened release of any stored substance; and f. Comply with Chapters 173-303 and 173-360 WAC. 2. Agriculture. New agriculture or hobby farms must use best management practices concerning animal husbandry, animal waste disposal, fertilizer use, pesticide use, and wastewater applications. It is highly recommended that farm owners and operators seek the technical assistance of the Clallam County Conservation District for the development of Farm Management Plans. 3. Land disturbing activities. All ground disturbing activities likely to substantially divert, alter, or reduce the flow of ground or surface waters, or otherwise adversely affect aquifer recharge must implement best management practices (BMPs) for groundwater protection, consistent with Chapter 13.63, PAMC. a. Stormwater infiltration must comply with Chapter 13.63 PAMC and the most recent update or version of the Department of Ecology’s Stormwater Management Manual for Western Washington. B. Prohibited uses. The following uses and activities for new development or redevelopment are prohibited within or adjacent to Critical Aquifer Recharge Areas, unless otherwise approved through a hydrogeologic assessment demonstrating no adverse impact: 1. Landfills or transfer stations; 2. Hazardous material disposal sites; 3. Outdoor wood preservation operations; 4. Manufacturing, processing, packaging, or storage of hazardous materials. 46November 4, 2026 G - 139 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 ARTICLE V. FREQUENTLY FLOODED AREAS 15.22.330 Purpose. A. Frequently flooded areas include floodplains and other areas subject to flooding that perform important hydrologic functions and may present a risk to people and property. They include, but are not limited to, the 100-year floodplain designations of the Federal Emergency Management Act (FEMA), and the National Flood Insurance Program (NFIP), known as “special flood hazard areas” which are regulated under PAMC Chapter 15.12 – Flood Damage Prevention. B. The purpose of this article is to protect the ecological functions and values of floodplains while protecting buildings, infrastructure, and people from flood risk. 15.22.340 Designation. A. Special Flood Hazard Areas. Frequently flooded areas include those areas established as special flood hazard areas under PAMC Chapter 15.12, Flood Damage Prevention, including those areas of special flood hazard identified by the Federal Insurance Administrator in a scientific and engineering report entitled “The Flood Insurance Study (FIS) for Clallam County, WA and incorporated areas”, dated April 23, 2025, and any revisions thereto, with accompanying Flood Insurance Rate Maps (FIRMs) dated April 23, 2025, and any revisions thereto. The best available information for flood hazard area identification as outlined in PAMC Chapter 15.12, Flood Damage Prevention, is the basis for regulation until a new FIRM is issued that incorporates the data utilized under PAMC Chapter 15.12, Flood Damage Prevention. B. Channel Migration Zones. Channel migration zones (CMZs) are areas in a floodplain where a stream or river channel can be expected to move naturally over time in response to gravity and topography. Development situated away from CMZs helps reduce flood and erosion hazards and costly repairs to infrastructure while preventing loss of crucial floodplain habitat. This area is designated using the method established by Rapp and Abbe that defines the CMZ as a composition of the following zones: 1. Historical migration zone. The Historical Migration Zone is the area the stream channel has occupied over the time period spanning the historical record as established through historical maps and aerials. 2. Avulsion hazard zone. The Avulsion Hazard Zone is an area deemed susceptible to avulsion of the main stem channel. Avulsions are abrupt switches in channel course than can have catastrophic consequences for existing floodplain development. Avulsion Hazard Zones may include low-lying floodplain areas capable of capturing main stem flows, and areas between channel bends prone to avulsions that cutoff meander bends. 3. Erosion hazard zone. The Erosion Hazard Zone is an area outside of the Historic Migration Zone that has a reasonable likelihood to be influenced by channel migration over the design life of the CMZ. A CMZ’s Erosion Hazard Zone often extends outside and above the FEMA flood zones along actively migrating streams. 15.22.350 Mapping A. Reference Only. The maps and resources cited in this article are to be used as a guide for the City of Port Angeles Staff, project applicants, and/or property owners, and may be continuously updated as new critical areas are identified. They are a reference and do not provide a final critical area designation. The current FIRMs are filed at the office of the City Clerk, 321 East 5th Street, Port Angeles, WA 98362 and with the City’s GIS Division. 15.22.360 General development standards. A. All development proposals in frequently flooded areas must comply with PAMC Chapter 15.12, Flood Damage Prevention, for general and specific flood hazard protection. 47November 4, 2026 G - 140 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 B. Base flood data and flood hazard notes must be shown the face of any recorded plat or binding site plan, including, but not limited to, base flood elevations, flood protection elevation, boundary of floodplain, and zero rise floodway. C. All development must conform to the provisions of the currently adopted International Building Code, including submittal of a critical area report. D. Development may not reduce the base flood water storage ability. Construction, grading, or other regulated activities that would reduce the flood water storage ability must be mitigated by creating compensatory storage on or off site. 15.22.370 Critical area report additional requirements. A. In addition to the minimum report contents required per PAMC 15.22.110, Critical area report, and PAMC 15.22.120, Minimum report requirements, any development proposal in a frequently flooded area must also contain the report requirements per PAMC 15.12.120.B. B. Habitat Assessment Required. Unless otherwise exempted, the critical area report must contain a habitat assessment prepared in accordance with the Regional Guidance for Floodplain Habitat Assessment and Mitigation (FEMA Region 10, 2013), or as hereafter amended. The habitat assessment is needed to identify the impact of the proposed development on existing floodplain and instream habitat functions and processes, and must contain, at a minimum, the following elements: 1. A description of the project area, including a map. 2. A description of the project area’s habitat including: a. Background research; b. Protected species identification; c. Site investigation; d. Habitat narrative; and e. Habitat area map. 3. A description of the project including the goal of the final project, construction processes and BMPs, and protection measures. 4. An assessment of the direct and indirect impacts of the action on any ESA-listed species and their aquatic, riparian, and floodplain habitat areas identified in the description of the project area’s habitat, as well as the cumulative effects of future actions that are reasonably certain to occur. Direct effects must be considered for the following: a. First primary constituent element, such as freshwater spawning sites; b. Second primary constituent element, such as freshwater rearing sites; c. Third primary constituent element, such as freshwater migration corridors; d. Essential Fish Habitat designated by the National Marine Fisheries Service; e. Fish and wildlife habitat conservation areas; f. Vegetation communities and habitat structures; g. Water quality; h. Water quantity, including flood and low flow depths, volumes and velocities; i. The channel’s planform pattern and migration processes; j. Spawning substrate, if applicable; and/or 48November 4, 2026 G - 141 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 k. Floodplain refugia, if applicable. 5. The effects determination criteria must be consistent with that of the National Marine Fisheries Service, US Fish and Wildlife Service, and the US Army Corps of Engineers: 1. No effect (NE). The project has no effect, whatsoever, to the listed species or designated critical habitat. 2. May Affect, Not Likely to Adversely Affect (NLAA). Any negative effects to the listed species or designated critical habitat are insignificant and/or discountable. A determination of NLAA would also be made for those activities that have only a beneficial effect with no short- or long-term adverse effects. If the effects determination is NLAA, the report should indicate what steps were taken to avoid and minimize any negative project impacts and include a mitigation plan consistent with the guidance provided in the Habitat Assessment and Mitigation document referenced above. 3. Likely to Adversely Affect (LAA). The effects of the project will result in short- or long-term adverse effects on the identified species or designated habitat area. The assessment must include a mitigation plan consistent with the guidance provided in the Habitat Assessment and Mitigation document referenced above. 6. No short- or long-term effects to ESA-listed species or their designated critical habitats are allowed to occur within the Protection Area as established in the Regional Guidance for Floodplain Habitat Assessment and Mitigation, FEMA Region X, 2013. As such, avoidance is the only viable mitigation option. Outside of the Protected Area, any adverse effect must be fully mitigated to the extent practicable, and the proponent must demonstrate how each of the measures within the mitigation sequence will be used. C. Exemptions. The following activities are exempt from the habitat assessment requirements established above: 1. Repair of existing buildings or structures located entirely within the existing footprint, including damage by fire or other natural disasters unless the repair constitutes substantial improvement or is necessitated by substantial damage; 2. Removal of noxious weeds; 3. Replacement of non-native vegetation with native vegetation; 4. Ongoing maintenance activities such as lawn and garden maintenance of lawfully established landscaped areas; 5. Removal of high-risk hazard trees, unless the tree provides critical habitat, such as an eagle perch or occupied nest; 6. Normal maintenance of public utilities and facilities; 7. Restoration or enhancement of floodplains, riparian areas, and streams that meet federal and state standards. ARTICLE VI. GEOLOGICALLY HAZARDOUS AREAS 15.22.380 Purpose. A. Geologically hazardous areas are areas that because of their susceptibility to erosion, sliding, earthquake, or other geological events, are not suited to siting commercial, residential, or industrial development consistent with public health or safety concerns. It is the purpose of this article is to reduce the risk of damage to structures and property from geologic hazards, to allow for natural geologic processes supportive of forming 49November 4, 2026 G - 142 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 and maintaining fish and wildlife habitat, and to regulate and inform land use and planning decisions. It is recognized that the elimination of all risk from geologic hazards is not feasible to achieve, but the purpose of this article is to reduce the risk to acceptable levels. B. Special consideration will be given to climate change risks associated with geologically hazardous areas including flooding, sea level rise, and mass wasting/slope failures throughout this article. 15.22.390 Designation. A. The following areas situated within the City of Port Angeles are hereby established as geologically hazardous areas and are subject to the provisions of this chapter: 1. Erosion Hazard Areas. Erosion hazard areas are those areas containing soils which, according to the United States Department of Agriculture Natural Resources Conservation Service (NRCS) Soil Survey Program, may experience significant erosion. They also include coastal erosion-prone areas, channel migration zones, bluffs, steep slopes, and areas with unconsolidated soils. 2. Landslide Hazard Areas. Landslide hazard areas are areas at risk of mass movement due to a combination of geologic, topographic, and hydrologic factors. They include any areas susceptible to landslide because of any combination of bedrock, soil, slope, slope aspect, structure, hydrology, or other factors, and include, at a minimum, the following: a. Areas of historic failures, such as: i. Those areas delineated by the USDA NRCS as having a significant limitation for building site development; ii. Those coastal areas mapped as class u (unstable), uos (unstable old slides), and urs (unstable recent slides) in the department of ecology Washington Coastal Atlas; or iii. Areas designated as quaternary slumps, earthflows, mudflows, lahars, or landslides on maps published by the United States Geological Survey or Washington Department of Natural Resources. b. Areas with all three of the following characteristics: i. Slopes steeper than 15 percent; ii. Hillsides intersecting geologic contacts with a relatively permeable sediment overlying a relatively impermeable sediment or bedrock; and iii. Springs or groundwater seepage. c. Areas that have shown movement from 10,000 years ago to the present, or which are underlain or covered by mass wastage debris of this epoch; d. Slopes that are parallel or subparallel to planes of weakness in subsurface materials; e. Slopes having gradients steeper than 80 percent subject to rockfall during seismic shaking; f. Areas potentially unstable as a result of rapid stream incision, stream bank erosion, and undercutting by wave action, including stream channel migration zones; g. Areas that show evidence of, or are at risk from snow avalanches; h. Areas located in a canyon or on an active alluvial fan, presently or potentially subject to inundation by debris flows or catastrophic flooding; and i. Any area with a slope of 40 percent or steeper and with a vertical relief of 10 or more feet except areas composed of bedrock. A slope is delineated by establishing its toe and top and measured by averaging the inclination over at least 10 feet of vertical relief. 50November 4, 2026 G - 143 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 3. Seismic hazard areas. Seismic hazard areas are areas subject to severe risk of damage as a result of earthquake induced ground shaking, slope failure, settlement or subsidence, soil liquefaction, surface faulting, debris flows, lahars, or tsunamis. 4. Tsunami hazard areas. Tsunami hazard areas include coastal areas and riverine shoreline areas susceptible to flooding, inundation, debris impact, and/or mass wasting as the result of coastal wave action generated by seismic events or other geologic events. 15.22.400 Mapping. A. The approximate location and extent of known potential geologically hazardous areas are shown on maps maintained by the City. The following resources provide information on the approximate location and extent of geologically hazardous areas and are hereby adopted by reference as amended: 1. Clallam County, Geohazards CCC 27.12.410; 2. Washington Department of Ecology, Coastal Zone Atlas; 3. U.S. Geological Survey geologic maps, landslide hazard maps, and seismic hazard maps; 4. Washington Department of Natural Resources Geologic Information Portal maps, including but not limited to landslides, tsunamis, earthquakes, and soil stability; and 5. USDA Natural Resources Conservation Service Web Soil Survey maps. B. Reference only. The maps and resources cited above are to be used as a guide for the City of Port Angeles Staff, project applicants, and/or property owners and may be continuously updated as new critical areas are identified. They are a reference and do not provide a final critical area designation. 15.22.410 General Development Standards. A. All development activities and uses are prohibited in geologically hazardous areas and their buffers, except as otherwise provided in this chapter under PAMC 15.22.070, Exempt Activities, 15.22.080, Allowed uses or activities, and 15.22.090, Permitted uses or activities. B. Approvals. New development proposals must be located and/or engineered and constructed to reduce risks to life, health, safety, and buildings, and not increase potential for landslides or erosion that could impact either other properties, public resources, or other critical areas. The City may impose conditions on development activity in a geologically hazardous area as needed to: 1. Protect human life and safety; 2. Minimize the potential for property damage related to seismic events, erosion and/or landslides; 3. Minimize the need for stream or riverbank coastal bluff stabilization in the future; 4. Reduce public liabilities for damages associated with geologic hazards; 5. Protect slope stability and minimize erosion, seismic, and/or landslide hazard risks; 6. Maintain natural sediment and erosion processes that are integral to the health and sustainability of freshwater and marine ecosystems as well as minimizing impacts to stream, river, and coastal processes such as channel infill, channel migration, sediment transport, or flooding. C. Impact Avoidance. Impact avoidance measures must include, but not be limited to, locating the use/development outside of the hazard area, reducing the number, size, or scale of buildings and appurtenant features; altering the configuration or layout of the proposed development; implementing special engineering methods for construction, drainage, and stormwater runoff management; preserving native vegetation, and other feasible protective measures. D. Viewshed enhancement. In landslide and erosion hazard areas, the Director may approve alterations in vegetation coverage for the purposes of viewshed enhancement, so long as such alterations will not: 51November 4, 2026 G - 144 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 1. Increase geological hazards such as erosion potential, landslide potential, or seismic hazard potential, as demonstrated by a qualified professional; 2. Adversely affect fish and wildlife habitat conservation areas, including cumulative impacts to the functions and values of these areas; 3. Remove with appropriate pruning practices more than 25 percent of the live crown of a tree over any five-year period. Pruning must be in support of maintaining tree health and vigor and be in accordance with ANSI tree pruning practices. Tree topping is not an acceptable pruning practice; however, reduction may be utilized on deciduous trees only when approved by an ISA Certified Arborist as an acceptable practice. Window pruning is the preferred pruning method when feasible. 4. Include felling, topping, or removal of trees. If a violation of this subsection should occur, the landowner must replace any trees that are felled, topped, or removed with new trees at a ratio of 2:1 within one year of the action in accordance with an approved restoration plan. Tree species that are native to the site with a preference for drought tolerant species must be used. At least one of the replacement trees must be evergreen. 15.22.420 Specific Development Standards. A. Erosion or Landslide Hazards Areas. Areas containing or adjacent to erosion or landslide hazard areas may be altered only when the Director concludes, based on environmental information provided by a qualified professional, the following criteria are met in addition to the general development standards established in PAMC 15.22.410: 1. The proposed alteration includes all appropriate measures to avoid, eliminate, reduce, or otherwise mitigate risks to health and safety. 2. The proposed alteration is outside of an erosion or landslide hazard area and any required buffers as set forth in subsection B of this section. 3. The removal and disturbance of vegetation, clearing, or grading will be limited to the area of the approved development, and will otherwise not be disturbed. 4. The development is outside of the area of potential upslope or downslope surface movement or potential deposition in the event of slope failure. 5. The development will not increase or concentrate stormwater discharge or sedimentation to adjacent properties beyond predevelopment conditions. 6. The development will not decrease slope stability on adjacent properties or increase the risk or frequency of landslide occurrences. 7. The proposed alterations will not adversely impact other critical areas. 8. Structures and improvements will minimize alterations to the slope contour, and will be designed to minimize impervious lot coverage unless such alterations or impervious surfaces are needed to maintain slope stability. 9. Upon permit issuance, the property owner must sign and record a notice on title, at the owner’s sole expense, a covenant in a form acceptable to the City, which: a. Acknowledges and accepts the risks of the development in the landslide hazard area; b. Waives any rights to claims against the City; c. Indemnifies and holds harmless the City against claims, losses, and damages; and d. Informs subsequent owners of the property of the risks and the covenant. B. Erosion or landslide hazard area buffers. Buffers of undisturbed vegetation will be required from the top, toe, and edges of any identified erosion or landslide hazard area in accordance with the following: 52November 4, 2026 G - 145 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 1. A minimum buffer of fifty (50) feet is established from the top, toe, and edges of erosion or landslide hazard areas for new developments, except as otherwise allowed under this subsection. The buffer may not be altered except by a general exemption, variance, or reasonable use exception approval, as authorized by this chapter; provided that such alterations meet all other standards for the protection of fish and wildlife habitat conservation areas. 2. Development proposals on sites that are directly adjacent to a wetland, marine shoreline, or other fish and wildlife habitat conservation area may be subject to additional buffer requirements and standards as set forth in the subsequent articles of this chapter. C. Buffer reduction. The buffer may be reduced by a maximum of 25 percent when a qualified professional is able to demonstrate to the satisfaction of the Director that the proposed development setback will: 1. Not adversely impact the stability of the erosion or landslide hazard area; 2. Not increase erosion and mass movement potential of the landslide hazard area; 3. Use construction techniques that minimize disruption of the existing topography and vegetation; 4. Include measures to overcome any geological, soils, and hydrological constraints of the site; 5. Not adversely impact other critical areas; and 6. Through design and engineering solutions, provide protection to the proposed development and adjacent properties equal to that of the standard buffer. D. Increased buffer. The standard buffer may be increased by the decision-maker based on the critical area report by a qualified professional that indicates a greater buffer is necessary to protect the proposed development and/or adjacent properties. E. Seasonal restriction. Clearing within an erosion or landslide hazard area or buffer may be allowed only from May 1st to October 1st of each year; provided, that the decision-maker may extend or shorten the dry season on a case-by-case basis depending on actual weather conditions and other factors deemed relevant. F. Stormwater management. Prior to any development activity, a plan for collection, transport, treatment and discharge of stormwater in accordance with the requirements of PAMC Chapter 13.63, or as amended, and in accordance with the current adopted Stormwater Management Manual for Western Washington. 15.22.430 Critical Area Report Additional Requirements. A. When City Critical Area Maps or other sources of credible information indicate that a site proposed for development or alteration is, or may be, located within an active or potentially geologically hazardous area, the Director will have the authority to require the submittal of a geological assessment report. B. Geologic Hazards Assessment. A geologic hazards assessment report for a geologically hazardous area must include a field investigation and contain an assessment of whether or not the type of potential geologic hazard identified is present or not present and if development of the site will increase the potential for landslides or erosion on or off the site. Geology hazards assessment reports must be prepared, stamped, and signed by a qualified professional. The report should: 1. Be appropriate for the scale and scope of the project; 2. Include a discussion of all geologically hazardous areas on the site and any geologically hazardous areas off site potentially impacted by or which could impact the proposed project. If the affected area extends beyond the subject property, the geology hazard assessment may utilize existing data sources pertaining to that area; 53November 4, 2026 G - 146 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 3. Clearly state that the proposed project will not decrease slope stability or pose an unreasonable threat to persons or property either on or off site and provide a rationale as to those conclusions based on geologic conditions and interpretations specific to the project; 4. Provide a description of the ground and surface hydrology and geology, the affected land form and its susceptibility to mass wasting, erosion, and other geologic hazards or processes, and other adequate information to determine compliance with the requirements of this article; 5. Provide conclusions and recommendations regarding the effect of the proposed development on geologic conditions, the adequacy of the site to be developed, the impacts of the proposed development, alternative approaches to the proposed development, and measures to mitigate potential site-specific and cumulative geological and hydrological impacts of the proposed development, including the potential adverse impacts to adjacent and down-current properties; 6. Geotechnical reports must conform to accepted technical standards and generally follow the guidelines set forth in the Washington State Department of Licensing Guidelines for Preparing Engineering Geology Reports in Washington (2006). In some cases, such as when it is determined that no landslide or erosion risk is present, a full report may not be necessary to determine compliance with this article, and in those cases a stamped letter or abbreviated report may be provided; 7. If a landslide or erosion hazard is identified, provide a recommendation for the minimum no- disturbance buffer and minimum building setback for avoiding the landslide or erosion hazard, based upon the geotechnical analysis; 8. For projects in seismic hazard areas, the report must also include a detailed engineering evaluation of expected ground displacements, amplified seismic shaking, or other liquefaction and/or dynamic settlement effects and proposed mitigation measures to ensure an acceptable level of risk for the proposed structure type or other development facilities such as access roads and utilities. C. Duration. A geological assessment or report for a specific site may be valid for a period of up to five years when the proposed land use activity and site conditions affecting the site are unchanged. However, if any surface and subsurface conditions associated with the site change during that five-year period, the applicant may be required to submit an amendment to the original geological assessment or report. ARTICLE VII. FISH AND WILDLIFE HABITAT CONSERVATION AREAS 15.22.440 Purpose. A. The purposes of this article are to: 1. Ensure sufficient habitat quality, quantity, and connectivity to support long-term, viable populations of fish and wildlife species; 2. Prevent the creation of isolated subpopulations within their natural geographic distribution through development regulation to avoid habitat degradation and minimize fragmentation; 3. Protect, restore, and maintain native fish and wildlife populations by protecting and conserving fish and wildlife habitat through the protection and enhancement of the ecological processes, functions and values, and biodiversity that sustain these resources; 4. Protect marine shorelines, valuable terrestrial habitats, streams and their associated riparian areas, and the ecosystem processes on which these areas depend. 15.22.450 Designation. A. Fish and Wildlife Habitat Conservation Areas (FWHCAs) are those areas identified as being of critical importance to the maintenance of certain fish, wildlife, and/or plant species populations. These areas are typically identified either by known point locations of specific species or by habitat areas, or both. All areas 54November 4, 2026 G - 147 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 within the City meeting these criteria are hereby designated critical areas and are subject to the provisions of this article. Habitat conservation areas include all of the following: 1. Areas where endangered, threatened, and sensitive species have a primary association as indicated in the U.S . Fish and Wildlife’s Threatened and Endangered Species List of Critical Habitat List, the National Marine Fisheries Service, or the Washington Department of Fish and Wildlife’s Priority Habitats and Species List, as amended; 2. Commercial and recreational shellfish areas; 3. Kelp and eelgrass beds; herring, smelt, and other forage fish spawning areas as identified by the Washington State Department of Natural Resources and the Department of Ecology; 4. Naturally occurring ponds under 20 acres and their submerged aquatic beds that provide fish or wildlife habitat. These do not include ponds deliberately designed and created from dry sites, such as canals, detention facilities, wastewater treatment facilities, farm ponds, temporary construction ponds, and landscape amenities; 5. Waters of the state as defined in RCW 90.48.020 to include lakes, rivers, ponds, streams, inland waters, underground waters, salt waters, and all other surface waters and watercourses in Washington; 6. Lakes, ponds, streams, and rivers planted with game fish by a government or tribal entity; 7. State natural area preserves, natural resource conservation areas, and state wildlife areas; and 8. Species and habitats of local importance as determined by the City. Locally important species and habitats have recreational, cultural, and/or economic values to the community. 15.22.460 Mapping. A. The approximate location and extent of identified fish, wildlife, and sensitive plant habitat areas are shown on the City’s critical area maps as well as state and federal maps and are for reference only. A location- specific assessment is necessary to determine the extent of the potential Habitat Conservation Area when a proposed use or activity is likely to contain a FWHCA. B. The following maps and inventories are hereby adopted by reference, as amended: 1. U.S. Fish and Wildlife Service 2. National Oceanic and Atmospheric Administration Fisheries Northwest Region Critical Habitat Mapper; 3. Washington Department of Fish and Wildlife Priority Habitats and Species maps; 4. Washington Department of Natural Resources Natural Heritage Program mapping data; 5. Washington Department of Natural Resources State Natural Area Preserves and Natural Resource Conservation Area maps; 15.22.470 General development standards for all FWHCAs. A. All new development use and activity proposals are prohibited from fish and wildlife conservation areas and their buffers except in accordance with this chapter, with the exception of those areas in the shoreline jurisdiction that are hereby regulated under PAMC 15.08, Shoreline Management. Alteration of FWHCAs or their buffers is prohibited except as otherwise allowed by this Chapter and may occur only if the proposed alteration of the habitat and any associated mitigation proposed does not degrade the ecological functions and values of the habitat. B. Exemptions. Exemptions from this article are listed in the provisions established in PAMC 15.22.070. All other uses and activities are regulated under this chapter. C. Approvals and best available science. Any approval of alterations or impacts to a FWHCA must be supported by the best available science as described in the required critical area report. The decision-maker may 55November 4, 2026 G - 148 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 condition approval of activities allowed within or adjacent to a FWHCA or its buffer as necessary to minimize or mitigate any potential adverse impacts and may include, but not be limited to, the following: 1. Establishment of buffer zones and building setbacks. Buffers must consist of an undisturbed area of native vegetation or areas identified for restoration or creation to protect the integrity, functions, and values of the affected habitat. Required buffer widths will reflect the sensitivity of the habitat and the type and intensity of the proposed activity; 2. Preservation or restoration of critically important vegetation and/or habitat features such as snags and downed large woody debris; 3. Preservation or enhancement of contiguous wildlife habitat corridors, to minimize fragmentation; 4. Limitation of access to the habitat area, including fencing or signage to deter unauthorized access, provided the fencing does not prohibit wildlife movement through the area; 5. Seasonal restriction of construction activities; 6. Establishment of a duration and timetable for periodic review of mitigation activities, if not already established in the mitigation plan; and 7. Requirement of a performance bond, when necessary, to ensure completion and success of proposed mitigation. D. Non-native species. No plant, wildlife, or fish species not indigenous to the region may be introduced into a FWHCA unless authorized by a state or federal permit or approval. E. Seasonal restrictions. When a species is more susceptible to adverse impacts during specific periods of the year, seasonal restrictions may apply. Larger buffers may be required and activities may be further restricted during the specified season for the applicable species. F. Subdivisions. The subdivision and short subdivision of land in FWHCAs and associated buffers is subject to the following: 1. Land that is located wholly within a FWHCA or its buffer may not be subdivided; 2. Land that is located partially within a FWHCA may be subdivided only if an accessible and contiguous portion of each new lot that meets the minimum lot size requirements for the zone is located outside of the FWHCA and its buffer; 3. Access roads and utilities serving a proposed subdivision may be permitted within the FWHCA and associated buffer only if the applicant’s qualified professional demonstrates, and the decision-maker determines, that no other feasible alternative exists, all unavoidable impacts are fully mitigated, and the use is consistent with this chapter; and 4. This subsection does not authorize new access roads and utilities in FWHCAs and associated buffers for existing subdivisions. G. Mitigation and Continuous Corridors. Mitigation sites must be located to preserve or achieve contiguous wildlife habitat corridors in accordance with a mitigation plan that is part of an approved critical area report to minimize the isolating effects of development on habitat areas and reduce fragmentation, so long as mitigation of aquatic habitat is located within the same aquatic ecosystem as the disturbed area. H. Mitigation and equivalent or greater biological functions. Mitigation for alterations to FWHCAs must achieve equivalent or greater biologic and hydrologic functions and must include mitigation for any adverse impacts up- or downstream of the project site. 56November 4, 2026 G - 149 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 15.22.480 Specific standards for riparian management zones. A. The Washington Department of Fish and Wildlife recognizes riparian ecosystems as a Priority Habitat for fish and wildlife. This area provides full ecological function for bank stability, shade, pollution removal, contributions of detrital nutrients, and recruitment of large woody debris. The City of Port Angeles hereby designates the riparian management zone (RMZ) as the location where protection and restoration of riparian ecosystem functions and values are addressed. B. Designation of the RMZ. The riparian management zone encompasses the riparian ecosystem and the channel migration zone to account for lateral movement of the riparian ecosystem over time. RMZs can also provide habitat for many terrestrial wildlife species and act as an important wildlife corridor. 1. The width of the RMZ is determined by the Site Potential Tree Height (SPTH200), which is the average maximum height of the tallest dominant tree for a given site class, or 100 feet, whichever is greater, measured horizontally. The RMZ is measured from whichever of the following features is furthest from the center of the watercourse: a. The ordinary high-water mark; b. The top of the stream bank; or c. The outer edge of the channel migration zone (if one exists). 2. Uses or activities that may impact an RMZ must provide a critical areas report prepared by a qualified professional describing the functions and values of the RMZ. The report must include the SPTH200 as determined by WDFW. If SPTH200 is calculated using site-scale data, that information must be included in the report, and clearly identify what inner measurement point was used and the extent of the RMZ with sufficient detail for field verification. The report must demonstrate that the project will result in no net loss of the ecological functions and values for the RMZ and associated species. C. Development standard for parcels containing an RMZ. Unless otherwise allowed in this chapter, all clearing, grading, new structures, or storage of materials and activities must be located outside of the RMZ, as defined in subsection B of this section. The following development standards apply for all parcels containing an RMZ: 1. In locations where an on-site sewage system is determined to be necessary, the system must be located outside of the RMZ; 2. New development that would require bank protection and/or hardening is prohibited, unless it addresses an imminent threat as an emergency activity. Consideration must be given to soft armoring prior to proposing hard armoring with any development proposal. 3. Due to the negative impact on RMZs, clearing, grading, and filling activities that cannot be located outside of the RMZ must limit disturbance and minimize effects to the greatest extent possible. Adequate mitigation must be demonstrated in the HMP pursuant to PAMC section 15.22.510.B. 4. Any action detrimental to habitat and any action affecting trees or vegetation, including but not limited to clearing or removal, are prohibited except as provided in PAMC 15.22.080. 5. If the RMZ is degraded due to the lack of trees or other native vegetation, the presence of invasive or nonnative species, and/or the presence of impervious surface or other development, the applicant must prepare and carry out a restoration plan that restores the ecological function of the RMZ to the extent commensurate with the impact of the development on the RMZ, and according to mitigation standards pursuant to PAMC 15.22.130 and 15.22.140. D. Piped watercourses and roadside ditches. The City recognizes that within the urban environment, many historical streams have been substantially modified to accommodate development, prior to the establishment of these regulations. Several of the regulated and mapped watercourses within the City of Port Angeles pass through natural reaches, modified reaches, piped reaches, and on occasion, along manmade roadside ditches. 57November 4, 2026 G - 150 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 1. Development along piped watercourses and ditches that do not meet the definition of a watercourse are subject to a 10-foot setback from the centerline of the pipes watercourse or ditch and are subject to the recording of a utility easement granted to the city for access and maintenance of the watercourse infrastructure. 2. The voluntary opening/daylighting and restoration or rehabilitation of a previously channelized, culverted, or piped watercourse is highly encouraged and may be approved by the decision-maker when the following is demonstrated in the critical area report: a. The restoration will result in a net gain in FWHCA functions, including an improvement in water quality, water storage capacity, and overall ecological functions; b. Opened channels must be designed to support fish and wildlife habitat and uninhibited fish access, unless demonstrated to be infeasible; c. A reduction to the standard RMZ is allowed to a minimum of 25 feet, or as recommended by a qualified professional in the critical area report; d. The proposal will not significantly increase the threat of erosion, flooding, slope stability, or other natural hazards on the site or adjacent properties; e. The proposal must demonstrate that the conveyance will maintain the flow capacity and not create flooding elsewhere in the drainage basin; f. The watercourse formerly in the pipe or culvert will be regulated as an RMZ, except for situations when the pipe or culvert was removed to provide for a publicly owned facility designed primarily for water quality treatment, flow control, or stormwater conveyance. E. Enhancement measures. Only those enhancement measures deemed most applicable and/or appropriate for RMZ enhancement projects will be considered in an EMZ modification proposal, and must be supported by best available science in the critical area report. These include, but are not limited to; 1. Removal of fish barriers to restore accessibility to fish; 2. Enhancement of fish habitat using large woody debris incorporated as part of a fish habitat enhancement plan; 3. Enhancement of fish and wildlife habitat structure that are likely to be used by wildlife, including wood duck houses, bat boxes, nesting platforms, the creation or retention of snags, rootwads/stumps, birdhouses, and heron nesting areas; 4. Planting native vegetation within the buffer area, especially vegetation that will increase value for fish and wildlife habitat, increase stream bank or slope stability, improve water quality and quantity, or provide aesthetic or recreational value; 5. Removal of invasive species and replacement with native vegetation consistent with best management practices for minimizing impacts to fish, wildlife, and their habitats, such as the use of hand tools or light equipment, use of aquatic herbicides and adjuvants regulated by the USDA and approved by the Department of Ecology, and minimizing soil compaction and erosion; 6. Creation of a surface channel where a watercourse was previously underground, in a culvert or pipe. Surface channels to be “daylighted” must be located in an RMZ and must be designed with energy dissipating functions or channel roughness features such as meanders and engineered log jams to reduce future bank failures and nearby flooding; 7. Removal or modification of existing stream culverts, such as road crossings, to improve fish passage, stream habitat, and flow capacities; or 8. Upgrading of retention/detention facilities or other stormwater management facilities beyond required levels. 58November 4, 2026 G - 151 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 15.22.490 Specific standards for all other FWHCAs. A. Endangered, threatened, and sensitive species. FWHCAs or buffers that have a primary association for state or federally endangered, threatened, or sensitive species or anadromous fish species are subject to the following: 1. No development is allowed within a FWHCA or buffer with which state or federally listed endangered, threatened, or sensitive species have a primary association, except that which is provided for by a management plan established by the Washington Department of Fish and Wildlife or applicable state or federal agency. 2. Whenever activities are proposed adjacent to a FWHCA with which state or federally endangered, threatened, or sensitive species have primary association, such areas must be protected through the application of protection measures in accordance with a critical area report prepared by a qualified professional and approved by the city. Alteration of the FWHCA or its buffer may not occur prior to consultation with the Washington Department of Fish and Wildlife, the Washington Department of Natural Resources, or other appropriate federal or state agencies. 3. In kelp and eelgrass protection zones as established by the Washington Department of Fish and Wildlife, no-anchor zones must be established. B. Other priority habitats and species. Fish and wildlife habitat conservation areas or buffers with species that are not state or federally listed as endangered, threatened, or sensitive species, and are not anadromous fish species are subject to the following: 1. Development activities and uses that result in unavoidable impacts are prohibited except as otherwise allowed by this chapter and may occur in priority species habitat areas and associated buffers only if the proposed alteration does not degrade the functions and values of the habitat in accordance with an approved critical area report with a habitat assessment/management plan, and only if the proposed activity is the only reasonable alternative that will accomplish the applicant’s objectives. Full compensation for the loss of acreage and functions of habitat and buffer areas must be provided in compliance with the mitigation performance standards and requirements of this chapter. C. Required buffer for non-RMZ FWHCAs. 1. Marine FWHCA Buffers. Buffers for all designated fish and wildlife habitats or species within marine shorelines must be regulated by Chapter 15.08 PAMC – Shoreline Management, and the current adopted version of the City’s Shoreline Master Program. 2. All other non-RMZ FWHCA buffers. Buffers from FWHCAs must be established to protect the functions and values of the critical area from the impacts of proposed adjacent activities. a. Buffer widths for FWHCAs must be based on consideration of the following factors: species- specific recommendations of the Washington Department of Fish and Wildlife; recommendations contained in a habitat management plan submitted by a qualified professional; and the nature and intensity of land uses and activities occurring on the lands adjacent to the site. Buffers must: i. Consist of an undisturbed area of native vegetation, or areas identified for restoration, sufficient to protect the integrity, functions, and values of the affected habitat; ii. Reflect the sensitivity of the habitat and the type and intensity of human activity proposed to be conducted nearby; iii. Be consistent with the applicable species-specific management recommendation provided by the Washington Department of Fish and Wildlife. b. Nesting bald eagles and their habitat. When activities are proposed adjacent to a confirmed bald eagle nest territory or communal roost, a bald eagle habitat management plan must be 59November 4, 2026 G - 152 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 developed by a qualified professional consistent with the US Fish and Wildlife Service national bald eagle management guidelines. Activities are defined as being adjacent to managed bald eagle sites when they are within 600 feet of a nest or within one-half (1/2) mile of a shoreline foraging area. Approval of the activity must not occur prior to consultation with the state or federal agency with authority on bald eagle pairs and their nest. 15.22.500 Stormwater management facilities. A. Stormwater management facilities may not be located within stream buffers, with the following exceptions: 1. Conveyance systems may be located in stream buffers on a case-by-case basis if deemed necessary and approved by the Director of Public Works and Utilities. 2. Full dispersion of flow, as described in BMP T5.30 of the Department of Ecology's most current SWMMWW, may be allowed in a stream buffer if approved by the Director of Public Works and Utilities. 3. The facilities or methods specified in subsections A.1 and 2 of this section are allowed only if impacts to the buffer, resulting from their installation, are avoided or mitigated. 4. Stormwater management design and facilities must be consistent with PAMC Section 13.63.190, to protect the hydrology and functions of the RMZ. Native vegetation enhancement in RMZ buffers may be approved for both buffer enhancement and as part of a best management practice to meet low impact development stormwater standards required by the Washington State Department of Ecology. Any stormwater management facility or method associated with RMZs must meet the state requirements adopted in PAMC Section 13.63.190. 15.22.510 Critical area report additional requirements. In addition to the minimum report requirements of PAMC 15.22.120, critical area reports for FWHCAs must meet the requirements of this section. If a project in a FWHCA also has other designated critical areas, such as wetlands or frequently flooded areas, the critical areas report must contain all additional report requirements for each relevant critical area type. A. Prepared by a qualified professional. A critical areas report for FWHCAs must be prepared by a qualified professional biologist, botanist, or ecologist. B. Habitat Management Plan Required. If an RMZ is found to be present and/or impacted by any proposed development, a Habitat Management Plan (HMP) must be included in the critical area report, to be prepared by a qualified professional biologist, botanist, or ecologist. The HMP must address the following: 1. The extent of critical areas within and adjacent to a proposed project site identified, along with the ecosystem functions and values that need protection; 2. Identify salmonids and other priority aquatic species that use the stream network in the immediate vicinity, as well as up- and downstream from the project site; 3. Identify any other Priority Species that may use the riparian corridor and any other Priority Habitats to which the corridor is connected; 4. Include a delineation map of the RMZ with field-verified ordinary high water mark(s) to be used for updating the City’s Critical Areas Maps; 5. Describe the relevant management recommendations for Priority Habitats and Species found on or near the site; 6. Identify and quantify current proposed disturbances to the RMZ and any other FWHCAs; 60November 4, 2026 G - 153 MCA 26-0090 Exhibit 2 Title 15 Amendments V4.0 September 16, 2026 7. Include a description of the project proponent’s mitigation sequencing. If mitigation is necessary, the HMP should identify ways to improve riparian ecosystem function by enhancing riparian corridor connectivity, or by improving the quality of the riparian area; and 8. Describe requirements for monitoring and adaptive management, including identifying measurable standards and expectations to monitor compliance such as composition of riparian tree species, maximum invasive plant cover, and total extent of vegetation cover. Monitoring visits must be identified at an appropriate interval for the project and include measurable triggers for requiring further action, such as maximum percent area coverage of invasive plants. Clearly identify who is responsible for performing site visits and preparing and submitting any future reports to the City. 15.22.520 Performance standards and requirements. A. Mitigation for alterations to FWHCAs must achieve equivalent or greater biologic and hydrologic functions and must include mitigation for any adverse impacts up- or downstream of the project site, consistent with the requirements of this article and an approved Habitat Management Plan. 61November 4, 2026 G - 154 ` MEMORANDUM DATE: Tuesday, September 22, 2026 TO: Planning Commission FROM: Planning Division RE: MCA 26-0090 Public Comment INTRODUCTION This memo and its attachment serve as the official City staff response to public comments and includes all noticing procedures and documents and individual comments and responses. It encompasses the questions from Planning Commission, City Council, Stakeholders, and Government Agencies. PUBLIC NOTICING PROCEDURES Public notice for Land Use Application MCA 26-0090 was opened on Wednesday, August 19, 2026, closed on Wednesday, September 23, 2026, and was provided in the following manner: • In the Peninsula Daily News: August 19, 2026 • At the City Hall Noticing Board: August 19, 2026 • On the City’s Website: August 19, 2026 See Attachment A for noticing documentation. PUBLIC COMMENT There were two individual written public comments received by staff during the open public comment period, in addition to the verbal comments from the public during the regularly scheduled planning commission meetings. Many of the comments received by the public related to ensuring critical areas regulations do not go above and beyond the state requirement of no-net-loss to also incorporate new ecological gain. There was a general concern over having adequate mapping available to the public upon adoption to ensure consistency with County, state, and federal mapping tools and to make navigating the areas identified as critical areas easier for local users. Additional comments were specific to viewshed enhancements and the ongoing Welcoming Vista project. 62November 4, 2026 G - 155 MCA 26-0090 Exhibit 3 Page 2 |Tuesday, September 22, 2026 PLANNING COMMISSION During the regularly scheduled Planning Commission meetings from May through August, the Commissioners raised several clarifying questions related to impacts on development, housing density, comprehensive plan goals, regulatory compliance, mapping discrepancies, buffer alternatives, and potential impacts to private landowners. Attachment B contains detailed questions and responses to all planning commission questions raised during the July and August meetings. Exhibit 4 of the staff report contains questions and answers from the June 2026 meeting. CITY COUNCIL At the August 25, 2026, City Council work session, several Councilmembers had clarifying questions related to decision authority, compensatory mitigation, unauthorized uses in critical areas and enforcement of these areas, viewshed enhancement and tree management, single-source water supplies and groundwater protection, among others. All questions and comments made during this meeting have been recorded and responded to accordingly in Attachment B to this memorandum. STAKEHOLDERS The Stakeholder Advisory Group met periodically throughout the municipal code development process for technical review and guidance from local professionals. This group had clarifying questions and comments specific to definitions, consistency with the Comprehensive Plan, third-party review of applications and reports, reasonable economic use and variances, conflicting regulations, mitigation requirements and monitoring, and mapping requirements and procedures. All comments to date have been documented and responded to accordingly in Attachment B to this memorandum. GOVERNMENT AGENCIES At the time of this staff report, the draft CAO had been sent to the Department of Commerce for review by applicable government agencies. The Washington State Department of Natural Resources is the only agency to have completed their review at this time. Their comments are documented and responded to accordingly in Attachment B of this memorandum. STAFF RESPONSE Staff have addressed all relevant comments through the review process, which are documented in the Public Comment Response Matrix as Attachment B. Attachment A: Public Noticing Documentation Attachment B: Public Comment Response Matrix Attachment C: Individual Written Comments by Date Received 63November 4, 2026 G - 156 Attachment A PUBLIC NOTICE - Public Hearing Process for a Municipal Code Amendment 26-0090 MCA - Application Type: Municipal Code Amendment Zone: Citywide Description: Critical Areas Ordinance updates are required under the Growth Management Act consistent with the periodic update of the Comprehensive Plan. Submitted: March 2, 2026 Applicant: City of Port Angeles Determined Complete: March 2, 2026 Location: Citywide Comment Period Close: Written comment must be received by September 23, 2026. WHAT: The City of Port Angeles is working towards an update of its Critical Areas Ordinance (CAO) as a requirement of the GMA. The CAO is updated every ten (10) years to ensure the applicable development regulation meets statutory requirements. Project information may be found on the City’s website: https://www.cityofpa.us/1442/Critical-Areas- Ordinance-Updates HOW TO COMMENT: Interested parties are encouraged to comment on the proposal and may request a copy of the decision once it’s been made and any appeal rights. Written comments must be submitted prior to the close of the public hearing, care of the Department of Community & Economic Development (DCED) ced@cityofpa.us or 321 E 5th Street, Port Angeles WA 98362 c/o DCED. DATE/TIME OF HYBRID PUBLIC HEARING: Wednesday, September 23, 2026 @ 6:00 PM PST LOCATION OF HEARING: This meeting will be held as a hybrid meeting in the City Council Chambers, 321 E 5th Street, Port Angeles WA 98362. HEARING PARTICIPATION: This hearing will be held as a hybrid meeting. The Audio Only and Live Hearing function and access to City Council Chambers will be available 30 minutes prior to the meeting. If you are unable to attend the hearing, or unable to deliver audio public testimony during the public hearing as described above, you may submit written public comment. All written public testimony must be postmarked prior to September 23, 2026. LEARN ABOUT THIS LIVE MEETING: www.cityofpa.us/Live-Virtual-Meetings Toll Free Phone Number for Audio Only: 1-844-992-4726 Access Code: 255 199 9993 (*Audio Only Testimony for those without internet access: Instructions will be given during meeting) DECISION AND APPEAL INFORMATION: The City Council decision will be made based on the Staff Report, record, and written public comment. Any appeal of this decision shall be filed within 21 days after the date of decision. .............................................................................................................................................. - State Environmental Policy Act - WHAT: This action has been determined to be exempt from the State Environmental Policy Act (SEPA) per RCW 43.21C.450(1). .............................................................................................................................................. FOR ADDITIONAL INFORMATION PLEASE CONTACT: Courtney Bornsworth, Natural Resource & Grant Administrator at (360) 417-4750 or ced@cityofpa.us. 64November 4, 2026 G - 157 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 1 of 60 Comments - Public # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 22-Jul-26 Public Commenter Verbal Comment Review materials and process Requested that presentation slides or handouts be made available and that agenda materials more clearly show proposed changes through redlines, highlighting, or similar formatting. Comment acknowledged. 2 22-Jul-26 Public Commenter Verbal Question State deadline and compliance Asked what Department of Commerce deadline applies to the CAO update and what consequences, including potential grant impacts, could result from failure to comply. The City is required to adopt an updated CAO prior to December 31, 2026. Failure to do so would result in ineligibility of future grant sources from various state agencies such as the Department of Ecology. 3 22-Jul-26 Public Commenter Verbal Comment Best management practices Expressed concern that best management practices developed by professionals may reflect differing professional perspectives or biases. Best management practices are commonly developed by government agencies, environmental organizations and industry experts to guide sustainable and effective operations. This reduces potential bias and differing professional perspectives. 4 22-Jul-26 Public Commenter Verbal Question Mitigation plans Asked whether mitigation plans are currently required for development affecting critical areas, whether the proposed ordinance changes those requirements, and whether plans must be prepared by a qualified professional. Mitigation plans are a current requirement of the existing CAO in situations where a regulated critical area is being impacted by development. The proposed changes to the regulation will not change this requirement, and the plans will still have to be prepared by a qualified professional, consistent with current regulations. 5 22-Jul-26 Public Commenter Verbal Comment Applicant costs and review time Expressed concern that additional studies, mitigation requirements, or professional review may increase applicant costs and extend development-review timelines. Additional studies, mitigation requirements, and professional review are already existing requirements within the City's CAO. Any proposed modifications to these requirements will not further exacerbate costs associated with developing in or adjacent to critical areas or extend review timelines beyond the SB5290 requirements. Attachment B 65November 4, 2026 G - 158 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 2 of 60 Comments - Public # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 6 22-Jul-26 Public Commenter Verbal Comment Review materials and timing Expressed concern that the approximately 140–150-page packet was provided only a few days before the meeting, limiting the time available for meaningful review. Comment acknowledged. 7 22-Jul-26 Public Commenter Verbal Question Tree regulation outside critical areas Requested clear confirmation that a property owner may remove trees located outside a critical area or buffer without triggering the proposed CAO tree-protection requirements, subject to other applicable regulations. Current regulation does not prohibit tree removal from private property with the exception of the CAO and street trees located in the public right-of-way. Certain landscaping requirements must be met for commercial and mutli- family design standards, but more residential zones do not have existing tree removal regulations associated with them. 8 22-Jul-26 Public Commenter Verbal Question Critical-area mapping Asked how the critical-area map was developed, who or what agency is responsible for the mapped information, and what source or authority guides its use. The City will be developing and managing the internal critical areas map based on the existing mapping tools that are managed by the applicable state or federal agency for each critical area. As agencies update their mapping tools, the City will follow suit to ensure the most up-to-date version exists within City-limits. 9 26-Aug-26 Public Commenter Verbal Question Stakeholder outreach / technical practitioner input Asked whether the City timely sought input from local wetland-planning, civil-engineering, and similar practitioners—not only delineators— and suggested giving Zenovic & Associates or another local firm an opportunity to review the proposal. The updates to the CAO are open for review by any and all community members who wish to participate. The stakeholder working group was formed by internal discussions and was vetted by multiple City departments. Staff will reach out to local firms for their input prior to the close of the public hearing. Attachment B 66November 4, 2026 G - 159 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 3 of 60 Comments - Public # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 10 26-Aug-26 Public Commenter Verbal Comment Critical-area mapping / accuracy / applicant cost Expressed concern that combined City, county, state, and federal maps may show false-positive features, omit completed delineations, create confusing mapped 'blobs,' and require property owners to pay to disprove mapping errors; cited a mapped stream disproved by delineation and an older delineation still absent from a commonly used map. Staff acknolwedge that not all mapping tools and features are created equal, and that groundtruthing is an important part of performing any sort of analysis on a property that may contain a critical area. The due diligence has always been on the property owner to prove whether or not critical areas exist on a parcel. This regulation will not change with these updates. 11 26-Aug-26 Public Commenter Verbal Comment Regulatory costs / housing and building costs Referenced/submitted a Seattle Times cost editorial, expressed concern that layered state and federal mandates increase building costs, and urged the City to push back on costly requirements. The handout text itself is not contained in the transcript. Comment acknowledged. 12 10-Sep-26 Public Commenter Written Comment Development prohibitions in critical areas Opposed blanket prohibitions on development in critical areas, citing regulatory requests discussed at the August 25, 2026 City Council work session. Certain activities or uses are prohibited in specific critical areas, which are all indivdually outlined in the applicable articles. These prohibited uses and activities are in place to not only protect the critical area's functions and values, but often times to protect the development from any hazards associated with the critical area, such as landslides, flooding, or tsunamis. 13 10-Sep-26 Public Commenter Written Comment Industrial variances Opposed restrictions on industrial variances, citing the August 25, 2026 City Council work session. Comment acknowledged. At this time, the CAO does not intend to restrict industrial variances. Any individual or business is required to go through the same process for a variance pursuant to the criteria established in 15.22.100. Attachment B 67November 4, 2026 G - 160 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 4 of 60 Comments - Public # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 14 10-Sep-26 Public Commenter Written Comment Net ecological gain Opposed reinstating a “net ecological gain” standard. Comment acknowledged. The City's Comprehensive Plan indicates a strive for net gain, where feasible, while continuing to meet no-net-loss standards. This is reflected in the current proposed draft. 15 10-Sep-26 Public Commenter Written Comment Artificial-fill waterfront / existing industrial development Argued that the working waterfront and downtown were developed on artificial fill to support maritime and industrial activity and should be regulated in a manner that recognizes those conditions and economic functions, rather than treated like undisturbed natural areas. Staff recognize that the waterfront and downtown were developed on artifical fill to support the industries currently in place. These locations are still susceptible to sea level rise, tsunamis, and coastal flooding, and must be regulated accordingly. Protection standards are there to also protect infrastructure from natural hazards, should they arise. 16 10-Sep-26 Public Commenter Written Comment Economic impacts / environmental and economic balance Expressed concern that requirements exceeding state mandates would discourage business recruitment and retention, investment, and job creation and harm working-waterfront businesses and families. Urged rejection of the requested restrictions and a CAO that balances environmental protection with economic viability. Staff are proposing a balanced approach to environmental protection while also allowing for existing and new businesses to continue to operate within the bounds of what is reasonably acceptable. 18 21-Sep-26 Public Commenter Written Comment Wetlands / buffers / buildable area Reported that an expanding wetland and its buffers have reduced the buildable area of four remaining Phase 1 lots at Lang Heritage Homes on West 10th Street. Noted installed sewer capacity and electrical infrastructure intended to support additional homes, subject to approvals. Requested consideration of a referenced wetland delineation map and previously provided stormwater records and chronology. Comment acknowledged. Attachment B 68November 4, 2026 G - 161 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 5 of 60 Comments - Public # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 19 21-Sep-26 Public Commenter Written Comment Stormwater connection feasibility An existing stormwater pipe is within immediate reach of the four remaining lots. Please evaluate whether a connection is feasible, including the pipe’s ownership, capacity, elevation, connection requirements, and any treatment needed. Please provide the City’s determination in writing. This request will be directed to the Public Works and Utilities Department. 20 21-Sep-26 Public Commenter Written Comment Wetland determinations; artificial- feature exclusion; stormwater discharges Requested a written, lot-by-lot determination of the wetland boundary, rating, buffer, building setback, and resulting buildable area. Asked what evidence is needed to evaluate whether an artificial-feature exclusion applies and how existing stormwater discharges will be assessed. Comment acknowledged. The burden of proof for wetland evaluations lies with the applicant/developer on a case- by-case basis. 21 21-Sep-26 Public Commenter Written Comment Stormwater design; grant funding The stormwater design grant application deadline is September 30, seven days after this hearing. Please state whether the City can take any action toward an application by that date. If it cannot, please provide a written design and funding path for addressing the drainage conditions affecting Lang Heritage Homes. This request will be directed to the Public Works and Utilities Department. Attachment B 69November 4, 2026 G - 162 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 6 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 22-Jul-26 Planning Commission Verbal Question Comprehensive Plan consistency Asked whether the Critical Areas Ordinance update must also comply with the Comprehensive Plan. Yes. The updates to the CAO will need to achieve the goals and policies set forth in the recently updated Comprehensive Plan while also adhering to the requirements for compliance with the GMA. 2 22-Jul-26 Planning Commission Verbal Comment Housing/development versus environmental protection Requested clarification of how the City would prioritize housing or development when tree, wetland, or other environmental protections conflict with development objectives. Housing may be permitted in locations that are otherwise encumbered by a critical area, pursuant to a reasonable use exception. Compensatory mitigaiton is needed in sitauations where impacts to a critical area cannot be avoided through a proposed development. 3 22-Jul-26 Planning Commission Verbal Comment General implementation; Housing and permit predictability Expressed concern that critical-area, SEPA, or other local review processes could recreate discretionary barriers, uncertainty, and delays that increase development costs and conflict with Comprehensive Plan housing- production objectives. Regulations are already in place for development in critical areas, and when required, for the State Environmental Policy Act. The need to balance multiple goals and policies in the comprehensive plan including housing-production objectives and environmental regulation can best be achieved through smart land use planning that prioritizes infill and redevelopment in locations that are void of critical areas to reduce costs associated with affordable developments. 4 22-Jul-26 Planning Commission Verbal Question Tree protection and critical-area applicability Asked how tree protection applies when development affects a tree and whether the two-for-one tree- replacement provision would apply. In critical areas specifically, trees that are removed through development must be replaced at a 2:1 ratio. Further regulation regarding tree removals and replacements will be addressed at a later time when staff complete the Urban Forestry Chapter. Attachment B 70November 4, 2026 G - 163 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 7 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 5 22-Jul-26 Planning Commission Verbal Question Tree protection outside critical areas Asked whether trees on vacant lots outside critical areas may be removed without triggering the proposed critical-area requirements. At this time, the only other regulations that exist in city code regarding tree removals are those that are located in public right-of-way, and commercial and multi-family landscapes. No other regulation exists at this time that would prohibit tree removals on private property outisde of critical areas. 6 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Best Available Science Asked whether Best Available Science developed by local, state, federal, or tribal sources must meet the criteria established in the Washington Administrative Code. The definition of "best available science" as proposed is from the applicable Washington Administrative Code and must meet the criteria as established. 7 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Best management practices Asked who develops or establishes the best management practices that would be used to implement the ordinance. Best management practices are commonly developed by government agencies, environmental organizations and industry experts to guide sustainable and effective operations. This reduces potential bias and differing professional perspectives. 8 22-Jul-26 Planning Commission Verbal Comment Critical-area mapping; Critical aquifer recharge areas Emphasized the need to understand how critical areas will be mapped and the extent of properties potentially affected, particularly where mapped critical aquifer recharge areas encompass substantial portions of the City. Mapping will be based on the designations of each critical area. While many parcels will fall within a critical aquifer recharage area, not all uses and activities on those parcels will be applicable to the regulations. 9 22-Jul-26 Planning Commission Verbal Question Critical aquifer recharge area applicability Asked whether every property within the mapped critical aquifer recharge area would be affected by the ordinance. Not all properties or uses that exist in critical aquifer recharge areas will be affected by the ordinance. Regulated activities will be those commercial, industrial, or home occupations that process or handle hazardous materials in regulated quantities and/or treat or store regulated quantities of hazardous materials. Attachment B 71November 4, 2026 G - 164 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 8 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 10 22-Jul-26 Planning Commission Verbal Comment Future water supply and aquifer protection Noted that future alternative water- supply needs could justify retaining aquifer mapping and protection work even if it was not currently mandatory. Comment acknowledged. 11 22-Jul-26 Planning Commission Verbal Question Critical-area delineation Asked whether definitions should identify the standards and methods used to delineate each type of critical area, including wetland delineation standards. The standards for designating each critical area are defined in the applicable articles. 12 22-Jul-26 Planning Commission Verbal Question Critical-area functions and values Asked how and when existing critical- area functions and values will be identified during site screening and review. The functions and values of the critical area identified will need to be addressed through the reporting process and evaluated by the qualified professional with expertise in the applicable critical area. 13 22-Jul-26 Planning Commission Verbal Comment PAMC 15.02 — Best Available Science; Tribal information Raised concern regarding references to Tribes within the Best Available Science provisions and requested consideration of how tribal information and the City's relationship with sovereign tribal governments are reflected in the ordinance. The inclusion of tribes in the definition of "best available science" comes from WAC 365-195-910(1) which states, "consultation with state and federal agencies and tribes can provide a quick and cost-effective way to develop scientific information and recommendations." Attachment B 72November 4, 2026 G - 165 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 9 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 14 22-Jul-26 Planning Commission Verbal Comment PAMC 15.02 — Best Available Science Commented that the proposed Best Available Science definition may be narrower than the cited WAC because it appears to focus on who prepared the information rather than the validity of the scientific process. Comment acknowledged. Staff have updated the definition to be more consistent with those of other jurisdictions, which now reads as follows: "Best available science" means the current scientific information derived from a valid scientific process consistent with criteria established in WAC 365-195- 900 through WAC 365-195-925 used in the process to designate, protect, and/or restore critical areas 15 22-Jul-26 Planning Commission Verbal Comment PAMC 15.02 — Buffer Commented that defining a buffer as entirely “undisturbed” or “untouched” may conflict with later provisions allowing restoration, maintenance, trails, utilities, or other authorized activities within buffers; requested clarification. Staff acknowledge this and added the following to the end of the definition: unless otherwise exempted, allowed, or permitted by this chapter. 16 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Development Asked whether activities included within the definition of “development” automatically require critical-area review or only when the activity may affect a critical area or buffer. Critical area review will only be required when the activity may impact a critical area or its buffer. 17 22-Jul-26 Planning Commission Verbal Comment PAMC 15.02 — Habitats of local importance Commented that the definition appears circular because it defines habitats of local importance as habitat areas found to be locally important; requested clarification. Comment acknowledged. The definition is intended to be broad so as to not limit which habitats and species the City has identified as being of local importance. 18 22-Jul-26 Planning Commission Verbal Question No-net-loss punctuation Asked whether the no-net-loss definition was incomplete or missing a period. The definition was missing a period. Staff have corrected this. Attachment B 73November 4, 2026 G - 166 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 10 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 19 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Historical condition Questioned what baseline is intended by “historical condition,” noting that conditions before an area was altered may be unknown or could extend far into the past. Staff have replaced the definition of "historic condition" with that of "reference condition" which means a baseline standard, benchmark, or set of normal measurements used to compare and evaluate the health, quality, or performance of an ecosystem, environment, or scientific system. 20 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Land disturbance activity Requested a clearer threshold for what constitutes land disturbance, including whether routine access, gardening, or minor soil disturbance would fall within the definition. Staff have added additional language to the definition of "land disturbing activity" that states minor soil disturbance for site-investigation puroposes or routine garden maintenance are not considered land- disturbing activities. 21 22-Jul-26 Planning Commission Verbal Comment PAMC 15.02 — Locally unique features Requested clarification or revision of the use of “usually” within the definition because it creates uncertainty regarding conditions that fall outside the typical description. Staff have replaced the word "usually" with "often" in this definition. 22 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Waters of the state Asked whether “waters of the state” is intended to include all surface waters and requested clearer language distinguishing regulated waters from artificial or constructed water features. The definition of "Waters of the State" has been relocated to 15.22.450.A.5 and the definition is consistent with that of RCW 90.48.020. While these do include surface waters, ponds that are less than 20-acres in size that were deliberately created from dry sites, including farm ponds and landscape amenities are not included in this definition. Attachment B 74November 4, 2026 G - 167 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 11 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 23 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Qualified professional Requested clarification of the education, experience, certification, and licensing requirements for qualified professionals, including whether the required professional experience applies to all listed degrees or only related fields. The definition of "qualified professional" has been modified to be more consistent with that of other jurisdictions, indicating what qualifications an individual must have specific to the critical area identified. 24 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Riparian management zone / Site-potential tree height Requested explanation of the scientific and regulatory basis for the 100- and 200-year site-potential tree- height concepts used in defining riparian management zones. Site-potential tree height is based on a conceptual model developed by the Forest Ecosystem Management Assessment Team to determine how to protect riparian areas in forested landscapes. The model conveys two important points: 1) four of the five riparian ecosystem functions or processes occur within one 200-year- SPTH, and 2) the marginal return for each function or process decreases as distance from the stream channel increases. Thus, designating a riparian area based on at least one SPTH at 200- years is a scientifically supported approach if the goal is to protect and maintain full function of the riparian ecosystem for aquatic habitats and species, including salmon. 25 22-Jul-26 Planning Commission Verbal Question Qualified professionals; Conflicting professional opinions Asked which qualified professional controls when the City and an applicant rely on different professionals or technical opinions, how a third-party review would be initiated, and who bears the cost. The City has the internal knowledge and capcity to review most technical reports prepared by a qualified professional. In some situations, if staff do not agree with the assessments prepared, they may hire a third-party reviewer to read and review the reports prepared by the applicant for consistency with the CAO. In this situation, the cost associated would be borne by the applicant. Attachment B 75November 4, 2026 G - 168 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 12 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 26 22-Jul-26 Planning Commission Verbal Question PAMC 15.02 — Critical-area setback Requested clarification of the critical- area setback definition, including how it differs from other setbacks in City code and whether it is intended primarily to protect development from hazardous conditions or protect the critical area. The definition of setback in this chapter is specific to critical areas, as are all other definitions defined in Chapter 15.02. Building setbacks adjacent to critical areas are important for protecting the functions and values of the critical area while also protecting the development from potential hazards associated with the critical area. 27 22-Jul-26 Planning Commission Verbal Question Chapter structure and review scope Asked whether Chapter 15.20 was being deleted and replaced by Chapter 15.22 and why the new chapter was not being reviewed in full. Yes, Chapter 15.20 is being replaced with Chapter 15.22. At the time of the July meeting, not all of Chapter 15.22 had been drafted so the review of all applicable articles will be phased. 28 22-Jul-26 Planning Commission Verbal Question Shane Park; Artificial or created wetlands Asked whether the ponded area at Shane Park, which may have resulted from prior City actions, could now constitute a regulated wetland and whether the City plans to review the area. Given the criteria that define a wetland, it is possible that this location would now be classified as such. Staff will discuss this topic in greater detail with the Parks & Recreation Director upon adoption of the CAO. 29 22-Jul-26 Planning Commission Verbal Comment Review instructions and material scope Expressed concern that including Chapter 15.22 materials while assigning only selected sections for line-by-line review was confusing. Comment acknowledged. 30 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.070(F)(1) — Emergency activities Requested clarification of how the 30- day post-emergency reporting requirement will be enforced and what consequences apply if required reporting is not completed. Failure to comply with the requirements of this section would result in an unauthorized modification and would be subject to enforcement provisions of the Port Angeles Municpal Code at the owner's or other responsible party's expense. Attachment B 76November 4, 2026 G - 169 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 13 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 31 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.070 — Exempt activities Commented that the exemption provisions appear to retain certain best-practice, restoration, mitigation, or other obligations, making it unclear which requirements do and do not apply to an exempt activity and whether a City determination is required. While exempt activities are not required to undergo full critical area review, they still must adhere to best management practices that minimize or otherwise do not degrade a critical area or its buffer. These activities are unlikley to disturb a critical area or its buffer due to the nature of the activity or the location where the activity takes place, such as in a lawfully established garden or landscape. Any activity that does not specifically meet the definition of those in 15.22.070.F 1-5. 32 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.070 — Routine landscaping and maintenance Asked what routine landscaping, gardening, maintenance, or community cleanup activities are allowed under the exemption provisions and whether activities such as organized vegetation cleanup near bluffs could require review. If the landscaped or garden area was lawfully created, meaning it has undergone previous critical areas review, the activities defined in 15.22.070.F.2 would be considered exempt. "Organized vegetation cleanup" that has not previously been reviewed under the critical areas regulation would require an approved restoration and management plan that would be subject to review. Once approved, future maintenance of those areas would be considered exempt. 33 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.070(B) — Reasonable methods Asked who determines what constitutes “reasonable methods” to avoid potential impacts when conducting an exempt activity. The exempt activities contain specific measures in their definitions that outline how to undergo the activity without impacting the criticial area or buffer. If the proponent determines at any point that their methods may not be considered reasonable, the burden of proof lies with the proponent and the decision on whether they are or not will be made by the Director of Community and Economic Development. Attachment B 77November 4, 2026 G - 170 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 14 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 34 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.080(A) — Allowed activities and avoidance Commented that an absolute requirement to avoid impacts appears inconsistent with later provisions allowing utilities, trails, vegetation management, and hazard- tree work; requested language recognizing allowable impacts where avoidance is not feasible. Staff have modified the sentence to the following to minimize confusion and inconsistency: "All allowed activities must use mitigatoin sequencing and best management practices that result in the least amount of impact to the critical areas where practicable." 35 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.080 — Site investigation Requested clarification that limited vegetation or soil disturbance necessary for activities such as wetland delineation and site investigation is allowed. Yes, minimal soil disturbance and vegetation removal of non-tree or shrubs is allowed (such as grass and other herbaceous plants), provided the areas that are disturbed are properly restored to minimize erosion and sedimentation. 36 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.080 — Minor utility projects Initially asked for clarification of “minor utility project,” then located the 75-square-foot threshold in the draft and withdrew the question. Comment acknowledged. 37 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.080 — Viewshed enhancement Raised concern that allowing tree thinning for viewshed enhancement could result in incremental damage or loss of trees and requested consideration of whether the exception is appropriate and sufficiently protective. The provisions established for viewshed enhancement have been drafted to ensure that best practices are utilized. Further management practices and guidance will be established in the preparation of the Urban Forest Management Plan. Attachment B 78November 4, 2026 G - 171 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 15 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 38 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.080 — Viewshed enhancement Requested consistency between the viewshed-enhancement provisions and related definitions or standards applicable to geologically hazardous areas, ravines, and bluffs. Specific requirements for viewshed enhancement in geologically hazardous areas (previously referred to as marine bluffs and ravines) are explained under 15.22.410.D. They are very similar but vary slightly from the provisions established in 15.22.080.A.4.h only because viewshed enhancements in geologically hazardous areas must also ensure the trimming will not lead to increased bluff instability. 39 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.080 — Tree replacement Asked for clarification of the two-to- one replacement requirement for removed trees or vegetation and how the requirement applies within critical areas. If trees are removed in a critical area or buffer, whether permitted or not, they must be replaced at a 2:1 ratio (two new trees for each tree removed). This only applies to the critical areas provisions of this chapter. 40 22-Jul-26 Planning Commission Verbal Question Tree replacement; Off-site mitigation Asked whether required tree replacement or mitigation may occur on another parcel owned by the same applicant and how that relates to future mitigation-banking provisions. Ideally, replacement trees should be installed adjacent to or near the location where trees were previously removed to mitigate for the lost functions and values of those trees in that particular location. If that isn't possible or there is a more suitable location for replacement trees, the Director may approve a subistitute location for plantings. 41 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.090 — Critical-area review Asked whether a property containing a critical area automatically triggers Type II review when the proposed development is located outside the critical area and buffer. Not necessarily. If during the development review staff determine that the proposed development will not have an impact on critical areas or their buffers, the applicant will not need to undergo a full Type II permit review. The applicant must demonstrate to staff the location of all proposed improvements in relation to any critical areas on or within 300-feet of the subject parcel on a site plan with the building permit for staff to adequately determine whether critical areas review will be triggered. Attachment B 79November 4, 2026 G - 172 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 16 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 42 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.090 — Review procedure Requested that the site- reconnaissance and review pathway shown during the presentation be incorporated or more clearly described in the code so property owners can understand when additional critical-area review is required. Staff have added additional language to 15.22.110.B.1 to indicate that if during site reconnaissance it is determined that the proposed development is unlikely to impact a critical area or its buffer, additional reporting may not be required. 43 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.090 — Drafting corrections Identified several drafting and formatting issues, including a cross- reference punctuation error, “beset” rather than “best,” incomplete wording, and indentation of stream- crossing provisions. Comment acknowledged and addressed all formatting and spelling errors. 44 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.100 — Reasonable-use exception Asked who determines what constitutes “reasonable use” for purposes of a reasonable-use exception. Due to the difficult nature of determining what a reasonable use is, these decisions are left to the Hearing Examiner to either approve or deny. 45 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.100 — Public notice and participation Asked whether the public receives notice and an opportunity to comment or participate when a reasonable-use exception or other critical-area permit may allow impacts to a critical area. Yes. As reasonbale use development applications are processed as a Type III permit, they are publicly noticed and open to a public comment period. Attachment B 80November 4, 2026 G - 173 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 17 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 46 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.100 — Construction feasibility and proportionality Raised concern that requiring the “best available” construction, design, and development techniques could be interpreted without a reasonable cost or feasibility limit or as an unlimited requirement for the most expensive construction available. This is required "to the maximum extent possible" meaning that any development that is proposed as a reasonable use must use the best available construction, design, and development techniques to the best of the proponent's abilities, rather than being explicitly required. 47 22-Jul-26 Planning Commission Verbal Question PAMC 15.22.100 — Meaning of construction standard Requested clarification that the provision concerns appropriate construction techniques rather than the quality or price tier of the building. Yes, this provision is referring to the actual construction techniques. 48 22-Jul-26 Planning Commission Verbal Comment PAMC 15.22.100 — Cross-reference Identified a potential incorrect internal code cross-reference within the reasonable-use provisions and requested correction. Acknowledged and corrected. 49 22-Jul-26 Planning Commission Verbal Question Critical-area tracts; Ownership and taxation Asked whether creation of a critical- area tract creates a separate tax parcel and raised concern regarding continuing property-tax obligations for land that may not be developable. Critical area tracts would not turn into a spearate tax parcel. They would remain with the existing tax parcel and simply go on title as being a recorded critical area, such as when wetland boundaries are shown on plats for development. 50 22-Jul-26 Planning Commission Verbal Question Critical-area tracts; Maintenance responsibility Asked who is responsible for maintaining a critical-area tract or easement, particularly where an adjacent property owner did not create the tract. All owners of lots adjoining separate critical area tracts are responsible for the maintenance and protection of the tracts. Maintenance of these areas consists primarily of ensuring the tract remains undisturbed. Attachment B 81November 4, 2026 G - 174 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 18 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 51 22-Jul-26 Planning Commission Verbal Question Critical-area tracts; Boundary markers Expressed concern that neighboring property owners could inadvertently enter, mow, or otherwise disturb a critical-area tract if its boundaries are unclear; requested confirmation regarding permanent fencing, signage, or other boundary marking. While it is possible that adjacent property owners may unintentionally mow or otherwise disturb a critical area tract, the permanent installation of fencing and signage will help reduce the chances of this happening. These provisions are established in 15.22.150.B and 15.22.160. 52 22-Jul-26 Planning Commission Verbal Question Exemption versus exception nomenclature and permit type Asked why the permit report listed critical-area exemptions as Type I when the earlier discussion appeared to place critical-area exceptions in Type III, and asked what “critical area exemptions” means. This goes back to the current improper use of the term "exception" in existing regulation. Critical area exemptions are different than exceptions. Exemptions are those activities or uses that only meet the criteria provided in 15.22.070. These are activities or uses that will not impact a critical area due to either the nature of the activity, or the fact that it takes place in a portion of a critical area or buffer that has previously been reviewed under the CAO. Examples include passive outdoor activities, trail maintenance, and landscape and garden maintenance. Exceptions are defined as either a reasonable use exception or critical area variance and require full critical area review. Attachment B 82November 4, 2026 G - 175 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 19 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 53 26-Aug-26 Planning Commission Verbal Question Wetland buffers, Comprehensive Plan, and land capacity Asked how the wetland-buffer options related to the Comprehensive Plan and what effect each option would have on buildable land and lot capacity. A thorough analysis of the CAO and the Comprehensive Plan can be found in the staff analysis. To sumarize, the comprehensive plan has many goals and policies identified to establish a land use pattern that is consistent with the community's vision while also protecting and enhancing our area's unique natural features and overall environment. Wetland buffers will vary depending on the option selected; however, buffer alternative 3 as proposed provides the most flexibility when it comes to single and multi- family developments adjacent to wetlands, and may even provide more buildable land than current regulations allow. 54 26-Aug-26 Planning Commission Verbal Question Land-capacity analysis assumptions Asked whether the Comprehensive Plan land-capacity analysis used existing wetland buffers. The Land Capacity Analysis map that was developed for the Comprehensive Plan Periodic update used existing wetland delineations from multiple sources including the City's own wetland GIS database, WDFW priority habitats and species, and the national wetland inventory. 55 26-Aug-26 Planning Commission Verbal Question Current critical-area map Asked whether a map showed the City's current critical areas. The City's current GIS map shows some, not all, of the delineated critical areas including wetlands. Updating these maps will be a critical component of the implementation phase of this project. 56 26-Aug-26 Planning Commission Verbal Comment Land capacity, clarity, and development cost Expressed concern that, although option 3 was flexible, it could be too complex for an ordinary landowner to understand without a professional and could cause some land to be treated as effectively unbuildable. Regardless of the wetland buffer alternative selected, all wetland reporting must be done by a qualified professional. Attachment B 83November 4, 2026 G - 176 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 20 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 57 26-Aug-26 Planning Commission Verbal Question Required wetland professional Asked whether any buffer option would allow a landowner to avoid hiring a qualified professional. No. If a landowner wants to develop on a parcel that is adjacent to wetlands or their buffers, all reporting must be done by a qualified professional, regardless of the buffer alternative selected. 58 26-Aug-26 Planning Commission Verbal Question WAC 365-195-915 and departure from BAS recommendation Asked whether the WAC provision allowing documented legal, social, cultural, economic, and political considerations, including a justified departure from a scientific recommendation, had been considered. Any departure from WAC 365-195-915 must have a valid scientific reason listed on the record that justifies a different policy choice. Reasons that have been accepted in past cases include a documented need for essential public facilities, emergency access or public safety, protection of Tribal cultural resources, or conflicts with other legal obligations. Reasons that departures have been rejected include, assertions that longstanding buffers have reasonably performed, unsupported speculations on outcomes, selecting weaker science to achieve a desired outcome, and using scientific uncertainty to justify weaker protections. The city does not currently have the capcity to develop a valid scientific reason for deviating from the requirements of RCW 36.70A.172 and will utilize the best available science provided by state and federal agencies during this update. 59 26-Aug-26 Planning Commission Verbal Question Currency of Ecology wetland guidance Asked whether the Department of Ecology's 2022 ready-to-go options had been considered and how they differed from the cited 2018 material. The City has been utilizing the 2022 Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates while drafting these amendments. Within the 2022 document, under the Wetland Buffer Options, the July 2018 modified appendix is referenced as providing further clarification and detail on the three wetland buffer alternatives. So, even though the 2018 recommendations predate the 2022 guidance document, Ecology still recognizes those alternatives as the best available science. Attachment B 84November 4, 2026 G - 177 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 21 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 60 26-Aug-26 Planning Commission Verbal Question Existing development within expanded buffers Asked how an existing approved development or structure would be treated if a newly enlarged buffer encompassed it. Previously approved developments that may be encompassed by a larger buffer under the new regulations may continue to exists as a pre-existing non- conforming situation as established in PAMC 17.95. Further provisions for these situations is established in 15.22.060.C. 61 26-Aug-26 Planning Commission Verbal Question Rebuilding a destroyed nonconforming structure Asked whether a nonconforming structure within a new buffer could be rebuilt in the same location if it was destroyed by fire. Yes. As set forth in 15.22.060.C.4, restoration or replacement of a structure that is damaged by fire or other natural disaster is allowed provided that a complete application for replacement is submitted within one year of the damage and the restoration or replacement is made to conform to the current critical areas regulations. If such regulations cannot be physically met without reducing the size of the strucutre, the restoration or replacement may not intesify any nonconformity that existed prior to the damage. 62 26-Aug-26 Planning Commission Verbal Question Unmapped wetlands and delineation trigger Asked whether a vacant parcel with no wetland shown on City maps would need to undergo wetland delineation during development review. A vacant lot may or may not contain wetlands - the burden of proof lies with the applicant on demonstrating whether critical areas are present. If during development review staff are led to believe wetlands may exist on the property due to soil type, aerial imagery, etc., it may delay the building permit process to have a wetland analysis performed. It is in the applicant's best interest to do their due diligence and have a site reconnaissance performed prior to submitting a building permit for review to indicate whether critical areas are or are not present. Attachment B 85November 4, 2026 G - 178 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 22 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 63 26-Aug-26 Planning Commission Verbal Question Wetland use-intensity categories Asked whether the proposed system added a moderate-intensity category to the existing low- and high-intensity categories. Yes. The proposed wetland buffer alternative will add a monderate- intensity category to the existing low- and high-intensity categories. 64 26-Aug-26 Planning Commission Verbal Comment Preferred wetland-buffer alternative Expressed support for buffer alternative 3. Comment acknowledged. 65 26-Aug-26 Planning Commission Verbal Comment Flexibility versus public clarity Noted that alternative 3 created a tradeoff because it was more flexible but less transparent to a landowner without professional assistance. Regardless of the wetland buffer alternative selected, all wetland reporting and delineations must be done by a qualified professional. 66 26-Aug-26 Planning Commission Verbal Comment Local flexibility and artificial wetlands Recommended using available WAC flexibility where justified, including for wetlands unintentionally created by road construction, while continuing to protect natural resources. The definition of wetlands excludes those that were unintentionally created after July 1, 1990 as a result of the construction of a road, street, or highway. As such, protection standards for wetlands that have been created in that manner do not apply. 67 26-Aug-26 Planning Commission Verbal Question Hybrid wetland-buffer alternative Asked whether the City could create a hybrid of options 2 and 3 by using a clear default buffer and requiring professional analysis only to reduce it. The City currently lacks the capcity to develop their own wetland buffer alternative at this time. If future direction is given to explore this further, staff would be happy to. 68 26-Aug-26 Planning Commission Verbal Comment Timing of buffer-option decision Requested that the vote be delayed until staff reviewed the cited 2022 options and the Commission understood the complete range of choices. See staff response to #60. Attachment B 86November 4, 2026 G - 179 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 23 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 69 26-Aug-26 Planning Commission Verbal Question Maximum buffer and delineation currency Asked whether a buyer could identify the maximum possible buffer from the charts and then obtain a smaller buffer based on site conditions, and how long a prior delineation would remain usable. The maximum buffer size will easily be identified through the charts in 15.22.240. 70 26-Aug-26 Planning Commission Verbal Comment Use of current BAS Expressed support for option 3 only if the City confirmed that the recommendation used the current 2022 guidance rather than relying on older material. See staff response to #60. 71 26-Aug-26 Planning Commission Verbal Comment Planning Commission recommendation on wetland buffers Recommended buffer alternative 3 with consideration of the exceptions or departure factors in WAC 365-195- 915. Any departure from WAC 365-195-915 must have a valid scientific reason listed on the record that justifies a different policy choice. Reasons that have been accepted in past cases include a documented need for essential public facilities, emergency access or public safety, protection of Tribal cultural resources, or conflicts with other legal obligations. Reasons that departures have been rejected include, assertions that longstanding buffers have reasonably performed, unsupported speculations on outcomes, selecting weaker science to achieve a desired outcome, and using scientific uncertainty to justify weaker protections. The city does not currently have the capcity to develop a valid scientific reason for deviating from the requirements of RCW 36.70A.172 and will utilize the best available science provided by state and federal agencies during this update. Attachment B 87November 4, 2026 G - 180 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 24 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 72 26-Aug-26 Planning Commission Verbal Question Article III wetlands review scope Asked whether the Commission had reviewed the proposed Article III wetland ordinance section by section rather than only the buffer options. Article III was reviewed at the August 26th PC meeting. 73 26-Aug-26 Planning Commission Verbal Question Historic flood-damage evidence Asked whether the City had data on buildings lost to flooding during approximately the last century to inform the frequently flooded-area standards. Staff have not been able to locate any records of this data at this time. 74 26-Aug-26 Planning Commission Verbal Comment Geologic-hazard buffer width Commented that increasing the ravine or marine-bluff setback from 25 feet to 50 feet appeared reasonable for safety. Comment acknowledged. 75 26-Aug-26 Planning Commission Verbal Question Unauthorized stream-corridor impacts and penalties Asked where enforcement or penalties for unauthorized environmental damage in stream corridors would be addressed. Section 15.22.190 addresses all unauthorized critical areas impacts, including damage to stream corridors. 76 26-Aug-26 Planning Commission Verbal Question SPTH buffer measurement point Asked whether the riparian buffer was measured from a tree, the outermost tree, the stream center, or another point. Riparian management zone is measured from one of the following features (whichever is the farthest from the center of the watercourse): the ordinary high-water mark, the top of the stream bank, or the edge of the channel migration zone if one exists. 77 26-Aug-26 Planning Commission Verbal Question Piped watercourse applicability Asked whether the riparian-buffer standard applied where a creek was piped beneath developed property. No. Piped watercourses are not subject to the riparian buffer standards; however, if they are to be daylit then they would be subject to the applicable buffer standards. Attachment B 88November 4, 2026 G - 181 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 25 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 78 26-Aug-26 Planning Commission Verbal Question Ordinary high-water mark versus top of bank Asked whether 'bank' in the ordinary- high-water-mark or top-of-bank standard meant the stream bank or the top of the ravine and requested clearer wording. "Bank" refers to top of the stream bank. This has been updated for clarity. 79 26-Aug-26 Planning Commission Verbal Question Planning Commission review of final critical-area map Asked whether the final critical-area map would return to the Planning Commission for review because the ordinance referenced the map. Once implementation takes place and the GIS mapping has been integrated, staff can bring the mapping tool back to the Planning Commission for review. 80 26-Aug-26 Planning Commission Verbal Question Scientific expert versus qualified professional Asked why 'professional' was replaced with 'scientific expert' without defining scientific expert and whether the two definitions should be reconciled. The definition for qualified professional has been amended and no longer contains "scientific expert". 81 26-Aug-26 Planning Commission Verbal Question Wetland delineation manuals and supplements Asked whether the regional supplements to the federal wetland delineation manual were federal, state, or locally developed. Regional suplements are developed by the US Army Corps of Engineers in partnership with state agencies. 82 26-Aug-26 Planning Commission Verbal Question Evidence when no wetland is found Asked whether an applicant would still need to submit documentation to the City if no wetland existed. The burden of proof is on the applicant to deomnstrate the presence or absence of wetlands during development review. If no wetlands are present on a parcel to be developed, the applicant should be able to demonstrate that through either site plans or a site feasibility assessment when submitting building plans for review. Attachment B 89November 4, 2026 G - 182 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 26 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 83 26-Aug-26 Planning Commission Verbal Comment Wetland-article numbering and agriculture wording Identified missing or misaligned item numbers and requested that the allowed-agriculture clause be revised so it did not say activities 'do not minimize adverse impacts,' using language such as no new or expanded adverse impacts instead. Comments acknowledged and addressed. 84 26-Aug-26 Planning Commission Verbal Question Placeholder table citations Asked whether citations shown as Table 15.22.XXX were temporary placeholders. Yes, table numbers will be updated prior to final adoption. 85 26-Aug-26 Planning Commission Verbal Comment Final map review Requested that the finalized critical- area map return to the Planning Commission for review. Comment acknowledged. 86 26-Aug-26 Planning Commission Verbal Question Legal/scientific basis for future aquifer regulation Asked about the legal and scientific basis for restricting land in an aquifer solely because it might become a future potable-water source. Only specific uses and activities will be regulated in areas that are identified as a critical aquifer recharge area. This is to ensure groundwater protection from contaminants that are already regulated by the fire department, should the City choose to utilize aquifers as a source of potable water in the future. The City's legal department is currently reviewing the CAO. 87 26-Aug-26 Planning Commission Verbal Question CARA hazardous-material criterion connector Asked whether the two hazardous- material criteria should be joined by 'or' or 'and/or' rather than requiring both. Comment acknowledged and addressed. Attachment B 90November 4, 2026 G - 183 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 27 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 88 26-Aug-26 Planning Commission Verbal Question Underlying zoning in CARAs Asked whether designation as a critical aquifer recharge area changed the underlying zoning or permitted uses. The underlying zoning will not be changed, however, permitted uses may need to be updated to ensure consitency, specifically with activities that result from specific commercial, industrial, and home occupation uses that process and handle regulated materials and/or store regulated materials. 89 26-Aug-26 Planning Commission Verbal Question Incomplete CARA subsection Asked whether the still-undrafted subsection would return to the Commission once completed. This subsection will be addressed during the public hearing on September 23rd. 90 26-Aug-26 Planning Commission Verbal Question CARA report scope for minor expansion Asked how much critical-area reporting would be required for a simple home or business addition that did not change the use or contamination potential. If the use or contamination potential of an existing home occupation or business is not changing, an applicant would state that information on their development application for staff to review. No further reporting would be required if they are compliant with the regulations established in Article IV. 91 26-Aug-26 Planning Commission Verbal Question Open-ended information requirement Asked what 'other information as required by the City' could include and whether that standard was too vague. Comment acknowledged and amended. 92 26-Aug-26 Planning Commission Verbal Comment Frequently flooded-area drafting gaps Requested restoration of the missing subsection D and fuller text in subsection E on alteration of watercourses. Comments acknowledged and addressed. Attachment B 91November 4, 2026 G - 184 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 28 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 93 26-Aug-26 Planning Commission Verbal Question Habitat-area map Asked whether the referenced habitat-area map existed or would be created. The habitat are map is something that will need to be prepared by the qualified professional responsible for preparing the habitat management plan. The map should show the general location of the affected habitats in relation to the proposed development, similar to that of what is prepared on a site plan for other types of development proposals. 94 26-Aug-26 Planning Commission Verbal Comment Map establishment and maintenance Recommended that the code explicitly require critical-area maps to be created and kept current. Comments acknowledged and addressed. 95 26-Aug-26 Planning Commission Verbal Question Increase from 25-foot to 50-foot geologic-hazard buffer Asked whether the provision increased a ravine setback from 25 feet to 50 feet and whether it also applied to bluff-side structures within shoreline jurisdiction. Yes, because the existing 'ravine' designation will now be defined as a geologically hazardous area, they will be subject to a 50-foot setback as opposed to a 25-foot setback. This is also consistent with the vegetation conservation area of the shoreline jurisdiction. The city will be updating their Shoreline Master Program in the coming years for consistency where needed. 96 26-Aug-26 Planning Commission Verbal Question Tree-removal prohibition and 2:1 replacement Asked why the provision prohibited felling, topping, or removal and then required 2:1 replacement when trees were felled. This requirement is established in situations where violations of the regulation occur. If there is not path to compliance established, it is difficult to enfore noncompliance with regulation. 97 26-Aug-26 Planning Commission Verbal Question Intentional violation and enforcement sufficiency Asked whether applying for a permit and planting two smaller trees was the only consequence if an owner intentionally removed a tree to improve a view. In addition to permitting and vegetation replacement, any individual out of compliance with regulation would also be subject to daily fees once a violation is established through code enforcement. Attachment B 92November 4, 2026 G - 185 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 29 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 98 26-Aug-26 Planning Commission Verbal Question Viewshed permit applicability Asked whether the viewshed- enhancement process applied only to new development or also to an existing owner who later wanted to improve a view. Establishing a viewshed corridor is part of a development standard, meaning that it may be done with new development; however, vegetation management including viewshed enhancement is an allowed use per section 15.22.080 so existing developments may apply for this use pursuant to the criteria established. 99 26-Aug-26 Planning Commission Verbal Question Reuse and expiration of arborist/mitigation reports Asked how long an approved arborist or mitigation report could be reused for recurring pruning without paying for a new professional report. Existing reports expire after five years or possibly sooner if the best available science and best management practices for the particular use or activity are updated. 100 26-Aug-26 Planning Commission Verbal Comment Geologic-hazard title notice/indemnification Expressed concern that the broad title notice and indemnification requirement could affect financing, insurance, and resale, and recommended legal review and consideration of recording the notice only after development in the hazard area was approved. Comment acknolwedged. Modified language to "Upon permit issuance" rather than "prior to permit issuance". This draft is currently under review by the City's legal department. 101 26-Aug-26 Planning Commission Verbal Question Species and habitats of local importance Asked how the City would determine which species and habitats were locally important. Utilizing the WDFW priority habitats and species list, the City will coordinate with local natural resource professionals and the Lower Elwha Klallam Tribe to establish a list of locally important species and habitats. 102 26-Aug-26 Planning Commission Verbal Question RMZ classification as FWHCA Asked whether riparian management zones were fish and wildlife habitat conservation areas and whether RMZs should be expressly listed. Yes, riparian management zones are a specific type of fish and wildlife habtiat conservation area. They are expressly listed because of the extensive regulations from the Department of Fish and Wildlife for protection standards of anadromous fisheries. Attachment B 93November 4, 2026 G - 186 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 30 of 60 Comments - Planning Commission # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 103 26-Aug-26 Planning Commission Verbal Question Ground-truthing site-potential tree height map Asked whether field evidence could override the state SPTH map when the mapped dominant tree species did not match present conditions. The dominant tree species that is used is based on the NRCS soil type for a given location, not on the actual field- verified dominant tree species. It is the dominant species that a site could potentially support under the right growing conditions. 104 26-Aug-26 Planning Commission Verbal Comment Piped watercourses Commented that the added treatment of piped watercourses was reasonable and helpful. Comment acknowledged. 105 26-Aug-26 Planning Commission Verbal Comment RMZ typo Requested correction of the reference from 'EMZ' to 'RMZ.' Comment acknowledged and corrected. Attachment B 94November 4, 2026 G - 187 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 31 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 25-Aug-26 City Council Verbal Comment Review process and access to presentation Requested the slide deck and noted that the engagement questions required more review time, with additional written feedback to follow. Comment acknowledged. 2 25-Aug-26 City Council Verbal Question Article I decision authority Asked which director would make the decision referenced in Article I and slide 20. The Community and Economic Development Director. 3 25-Aug-26 City Council Verbal Question Compensatory mitigation Asked whether compensatory mitigation meant a monetary payment in lieu of impacts and what other forms it could take. Fee-in-lieu of is one form of compensatory mitigation. Additional mitigation measures include restoration (both re-establishment and rehabilitation), establishment, protection (preservation), or a combination of enhancement and protection. 4 25-Aug-26 City Council Verbal Question Location of mitigation requirements Asked whether compensatory- mitigation options and requirements would be included in the code or the planned handbook. Yes, they will be established in code under section 15.22.260. 5 25-Aug-26 City Council Verbal Question Unauthorized camping and enforcement Asked whether the unauthorized-use and enforcement provisions would apply to people living or camping outdoors in critical areas. Because camping is not an authorized use of the underlying zone of critical areas, such as public building and parks, any unauthorized living or camping within critical areas would be subject to enforcement provisions of PAMC. Attachment B 95November 4, 2026 G - 188 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 32 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 6 25-Aug-26 City Council Verbal Question Critical aquifer recharge area mapping Asked whether critical aquifer recharge areas were present in Port Angeles and where they were located. Yes, several CARAs exist within City Limits. Their locations will be identified through the implementation phase of this update when GIS maps are updated to reflect the adopted ordinance. The County has a current CARA map that can be referenced at this time. 7 25-Aug-26 City Council Verbal Question Tree management, retention, and viewsheds Asked what tree management and tree retention meant in the update. For the CAO, tree management will be limited to hazard tree removals and pruning for tree maintenance and viewshed purposes only. Additional tree retention and management practices will be established at a later time with the Urban Forest chapter and Urban Forest Management Plan. 8 25-Aug-26 City Council Verbal Comment Cautious uses and encampments Requested robust future discussion of activities and uses requiring greater caution, particularly where the policy intersected with homelessness and encampments. Comment acknowledged. 9 25-Aug-26 City Council Verbal Comment Critical aquifer recharge area protection Recommended proactive protection of potential future water sources because drought and low water levels increased their importance. Comment acknowledged. 10 25-Aug-26 City Council Verbal Comment Restoration leadership Recommended that the City take a more active role in restoring degraded critical areas while partnering with willing community organizations. Comment acknowledged. Attachment B 96November 4, 2026 G - 189 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 33 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 11 25-Aug-26 City Council Verbal Comment Viewshed enhancement and enforcement Recommended giving watershed protection, shade, and salmon habitat greater weight than viewshed enhancement through an enforceable process coordinated across code enforcement and police capacity. Vegetation removal or pruning must be done in a manner that minimizes disturbance and prevents adverse effects on soil stability, fish and wildlife habitat, water quality, or water quantity. If an applicant cannot demonstrate these requirements through the permit process, a permit will not be approved. 12 25-Aug-26 City Council Verbal Comment Interconnected stream and shoreline systems Noted that the City's five stream and riparian corridors connected toward Olympic National Park and that upstream and downstream actions affected neighboring jurisdictions and required coordination. Comment acknowledged. Strong protection standards for riparian and wildlife corridors must be established between adjacent agencies, including the County, US Forest Service, DNR, and Olympic National Park. 13 25-Aug-26 City Council Verbal Comment Existing urban footprint and buffers Noted that homes, industry, and parks already existed near critical areas and recommended strong setbacks and buffers rather than blanket prohibitions. Setbacks and buffers are established for each of the five critical areas, based on the best available science and recommendations from the state agencies that govern the areas. 14 25-Aug-26 City Council Verbal Comment Tree-height setbacks and development limits Recommended that potential mature tree height inform development setbacks and that the City deny development on some sites rather than grant an exception. The City cannot legally deny all reasonable use of a property due to the presence of critical areas. There is a legal obligation to allow for a reasonable use exception. If the city is interested in denying future development on parcels of land that are completely encumbered by critical areas, direction should be given to explore a buy-back program of sorts to purchase parcels of interest. Attachment B 97November 4, 2026 G - 190 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 34 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 15 25-Aug-26 City Council Verbal Comment Conservation acquisition Recommended working with state legislators on a buyback program to acquire parcels unsuitable for development and protect them permanently through conservation easements. Comment and acknowledged. 16 25-Aug-26 City Council Verbal Comment Hazardous materials Recommended greater scrutiny of uses involving oil, gasoline, diesel, and similar hard-to-clean contaminants near critical areas. Comment acknolwedged. This is addressed in Article IV, critical aquifer recharge areas. 17 25-Aug-26 City Council Verbal Comment Roadways, traffic, and stormwater Recommended accounting for traffic and road impacts, including tire- related contaminants and stormwater treatment before runoff reached critical areas. Comment acknowledged. Updates to the City's stormwater regulations would best address treatment prior to runoff. Additionally, maintaining adequate, healthy vegetation buffers along our stream corridors assists with polutant filtering. 18 25-Aug-26 City Council Verbal Comment Public GIS mapping Requested robust public GIS layers showing wetlands, critical areas, wellhead-protection areas, and aquifers rather than limiting those maps to internal use. Mapping tools are available for both internal and external users. The City maintains a public-facing GIS portal that will be updated with new critical area layers during the implementation phase. 19 25-Aug-26 City Council Verbal Comment Applicant-funded technical reports Expressed concern that applicant- hired technical reports could create bias and recommended independent third-party review focused on objective environmental analysis. 15.22.170 allows the Director of Community and Economic Development to engage in third-party review of critical area reports, if during review,it is determined that additional external review is warranted. Attachment B 98November 4, 2026 G - 191 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 35 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 20 25-Aug-26 City Council Verbal Comment Emergency shoreline permits and interagency notice Requested prompt, reliable notice to the City and follow-through for emergency shoreline or erosion permits issued by state agencies, including during lengthy finalization periods and ownership changes. Shoreline permitting and timelines will be addressed during the periodic update to the City's shoreline master program. 21 25-Aug-26 City Council Verbal Comment Aquifer protection and source switching Recommended fully protecting aquifers and evaluating them as a future source-switching or supplemental-water option when Elwha River flows were low. Comment acknowledged. 22 25-Aug-26 City Council Verbal Comment Tree-canopy benefits Noted that tree retention supported carbon sequestration and neighborhood cooling. Comment acknowledged. 23 25-Aug-26 City Council Verbal Comment Priority restoration sites and staffing Recommended active restoration of degraded locations such as the former mill site, Valley Creek, and the lagoon, supported by additional natural-resources staffing and field capacity. Comment acknowledged. 24 25-Aug-26 City Council Verbal Comment Enforcement capacity Identified the need for additional enforcement capacity if the ordinance were expected to address unauthorized camping and other critical-area violations. Comment acknowledged. Attachment B 99November 4, 2026 G - 192 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 36 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 25 25-Aug-26 City Council Verbal Question Airport trees Asked whether no-topping or tree- felling restrictions would apply to City-owned trees near the airport. The trees at the airport are located outside of a critical area, as such, the regulations under this chapter would not apply. However, during the urban forestry chapter development, best management practices will be established for all other trees on city- owned property, including trees at Lincoln Park near the airport. 26 25-Aug-26 City Council Verbal Question Waterfront District viewshed work Asked whether the amendments would make the Waterfront District's effort to open the view behind the waterfront hotel more difficult. Proposed amendments would not make the existing project for viewshed enhancement behind the Red Lion Motel - the viewshed enhancement provisions are only being modified slightly from current regulation to ensure best management practices are up to date. 27 25-Aug-26 City Council Verbal Comment Time to review engagement questions Commented that the eight policy questions should have been available earlier and noted that more considered written feedback would follow review of the emailed deck. Comment acknowledged. 28 25-Aug-26 City Council Verbal Question Reuse of County aquifer mapping Asked whether the City could use the existing County aquifer map for its public GIS without commissioning new survey work. Yes, the city can adopt by reference the existing County map showing the location of the critical aquifer recharge areas. 29 25-Aug-26 City Council Verbal Comment Restoration leadership Recommended that the City take a large, visible leadership role in restoring degraded critical areas. Comment acknowledged. Staff will await future guidance from leadership in these efforts. 30 25-Aug-26 City Council Verbal Question Code-enforcement staffing Asked whether the City currently had two code-enforcement officers. Confirmed. Attachment B 100November 4, 2026 G - 193 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 37 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 31 25-Aug-26 City Council Verbal Comment Comprehensive critical-area mapping Requested visual maps of stream corridors, including buried streams beneath roads, shorelines, ravines, and aquifers, to show where policy would apply and support defensible decisions. Comment acknowledged - mapping will be updated during the implementation phase of this project upon Council adoption. 32 25-Aug-26 City Council Verbal Question Development on fill and climate risk Asked how the ordinance or related plans would address downtown and other shoreline areas built on fill when considering climate-change and shoreline risk. These issues will be further addressed during the City's periodic review of the Shoreline Master Program. Greater scrutiny may be required when considering factors such as sea level rise and earthquake and tsunami hazards, given the location and extent of the known geologically hazardous areas associated with downtown. 33 25-Aug-26 City Council Verbal Comment Net ecological gain and public review Recommended revisiting net ecological gain, providing a clear opportunity for public discussion, and incorporating public Comments on standards grounded in best available science. Per the goals and policies of the recently updated comprehensive plan, the critical areas ordinance will strive for net gain of ecological functions and values while also maintaining no-net- loss as the currently accepted best available science from the Department of Fish and Wildlife's guidance documents. Additionally, various state agencies, including WDFW, are currently reviewing the draft CAO for meeting statutory requirements. The public is invited to review and comment during the Public Hearing on September 23rd. 34 25-Aug-26 City Council Verbal Comment Variance standards and consistent enforcement Recommended a specific, transparent variance and enforcement process that avoided selective treatment based on complaints, wealth, business influence, or ability to navigate the application process. Variances are established in 15.22.100. Attachment B 101November 4, 2026 G - 194 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 38 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 35 25-Aug-26 City Council Verbal Comment Kelp, eelgrass, anchoring, and harbor access Recommended protecting kelp and eelgrass from anchoring impacts, considering public mooring buoys or additional public dock space for smaller vessels, and evaluating harbor access equitably without prioritizing large business interests. Many of these management recommendations can be incorporated during the City's Shoreline Master Program periodic update. A no-anchor zone in kelp and eelgrass protection zones will be established. 36 25-Aug-26 City Council Verbal Comment Aquifer protection and alternate supply Recommended protecting aquifers and water-storage capacity and evaluating alternate water sources in light of drought and regional watershed concerns. Comment acknowledged. 37 25-Aug-26 City Council Verbal Comment Holistic tree-canopy management Recommended that tree policy recognize parcel interdependence, including shade and microclimate benefits supplied by neighboring trees, and manage the urban canopy holistically. Comments acknowledged and will be addressed through the development of the Urban Forestry Chapter and Urban Forest Management Plan. 38 25-Aug-26 City Council Verbal Comment Equity between new and existing development Recommended avoiding inequitable treatment between new development and existing property owners while protecting critical areas and preserving reasonable buildability. Regardless of an individual's wealth, all proposed development on land that is within or adjacent to a critical area must adhere to the regulations established to protect the ecological functions and values of the critical area, and to ensure that any proposed use or development is safe for the individual or business interested in development. Attachment B 102November 4, 2026 G - 195 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 39 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 39 25-Aug-26 City Council Verbal Comment Bluff erosion, buffers, and existing development Recommended that the CAO address new and existing development on unstable marine bluffs, larger buffers, downstream safety impacts, taxpayer exposure, and consistent enforcement, with more detail in later presentations. Comments acknowledged. 40 25-Aug-26 City Council Verbal Comment Code clarity and consistent administration Recommended updated definitions and clear standards to reduce inconsistent answers while preserving flexibility for project- specific circumstances. The defintions section of the chapter has been updated to reflect all current definitions and consolidated for ease of use. 41 25-Aug-26 City Council Verbal Question Comparable single-source water cities Asked how many comparable jurisdictions used in the code review also relied on a single water source. There are 11 sole source aquifers that are regulated under the EPA in Western Washington. Of the comparable jurisdictions used in this code review, three of them fall within the sole source aquifer mapped locations established under the EPA. Additional cities, such as Bellingham, rely on a single-source for drinking water that is not an aquifer, similar to Port Angele; however, they have chosen not to adopt any regulation for CARAs becuase they do not currently use aquifers as a source of potable water. 42 25-Aug-26 City Council Verbal Question Availability of qualified professionals Asked how many qualified professionals were locally available to prepare required reports and whether limited availability could make the ordinance impracticable. The County has a list of qualified professionals that they distribute to applicants who request it. They city can develop one of their own or refer to the County's list, if desired. Attachment B 103November 4, 2026 G - 196 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 40 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 43 25-Aug-26 City Council Verbal Question Geographic scope and UGA Asked whether the ordinance would apply to the urban growth area, including the proposed boundary swap identified in the Comprehensive Plan. No, these regulations only apply to areas within City Limits. 44 25-Aug-26 City Council Verbal Comment Aquifer protection and planned groundwater supply Noted that persistent drought and reduced snowpack increased the value of the planned groundwater project and expressed concern that contamination would undermine that future resource. Comment acknowledged. 45 25-Aug-26 City Council Verbal Comment Agricultural uses in aquifer areas Recommended preserving opportunities for low-contaminant or biodynamic agriculture while distinguishing those activities from uses that could damage aquifers. Agricultural uses are defined as commercial agriculture and animal husbandry. Any other sort of hobby farming or otherwise "backyard" agricutlure would not be required to undergo critical area permit review. 46 25-Aug-26 City Council Verbal Question State-regulated forest-practice exemption Asked whether the exemption for forest practices regulated by the state meant that the state itself was broadly exempt from the CAO. No, forest practices that are regulated by the state are those that are reviewed under RCW 76.09. This does not provide the state a blanket exemption from the critical areas review. 47 25-Aug-26 City Council Verbal Comment Bluff and shoreline erosion mechanisms Recommended distinguishing erosion driven by stormwater runoff and geologic instability from shoreline erosion driven by wave action while addressing both through the appropriate critical-area and stormwater tools. Stormwater management is regulated by the Public Works Department and thus, any amendments to the existing stormwater regulation must be developed by the appropriate department. CED will address bluff erosion and best management practices for stormwater runoff during the updates to the Shoreline Master Program. Attachment B 104November 4, 2026 G - 197 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 41 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 48 25-Aug-26 City Council Verbal Comment Nearshore trails and public access Recommended retaining existing downtown trails while considering over-water redesign as an immersive path that could improve public access and reduce nearshore impacts. This can be addressed during the updates to the Shoreline Master Program. 49 25-Aug-26 City Council Verbal Comment City-owned shoreline infrastructure and restoration Recommended that the City lead by protecting its own critical areas, relocating infrastructure where feasible, and advancing naturalized shoreline protection at Ediz Hook using large wood and native vegetation. This can be addressed during the updates to the Shoreline Master Program and with future guidance from Council. 50 25-Aug-26 City Council Verbal Comment Environmentally responsible shoreline redevelopment Requested strong, usable CAO direction for environmentally responsible future development of the downtown nearshore and former mill property. The downtown nearshore and former mill property are primarily regulated under the Shoreline Master Program, and any additional direction for the future development of these areas will need to be provided during the updates the the SMP. 51 25-Aug-26 City Council Verbal Comment Location of mitigation Recommended keeping mitigation within Port Angeles and preferably within the same watershed or riparian system rather than shifting ecological impacts elsewhere. This is addressed under mitigation requirements specific to wetlands in 15.22.260 and 15.22.520 for fish and wildlife habitat conservation areas. Attachment B 105November 4, 2026 G - 198 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 42 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 52 25-Aug-26 City Council Verbal Comment Follow-up timing and legislative schedule Recommended submitting written questions early enough for review and preserving the schedule between the Planning Commission hearing and Council first reading so revisions could be incorporated without a last- minute scramble. Staff will provide responses to questions as soon as possible after the completion of the Public Hearing. 53 25-Aug-26 City Council Verbal Comment Mooring-program reference Identified Port Townsend and the Jefferson County Marine Resources Committee as references for boat- mooring approaches. Staff will look into these provisions when further establishing boat-mooring approaches during the SMP updates. 54 25-Aug-26 City Council Written Comment Supported uses near critical areas Recommended supporting conservation and restoration, native vegetation and invasive-species work, stream, wetland, riparian, floodplain, fish-passage and habitat projects, low-impact recreation and education, environmental research and monitoring, and Indigenous stewardship practices. All of these uses or activities will be supported as either exempt or allowed uses established in 15.22.070 and 15.22.080. 55 25-Aug-26 City Council Written Comment Uses requiring greater scrutiny Recommended greater scrutiny of intensive residential, commercial, industrial, roadway, parking, and recreation uses; grading, clearing, hazardous-material, impervious- surface, drainage-altering, groundwater-affecting, and mature- vegetation-removal activities; and directing intensive development away from critical areas and buffers where alternatives existed. These uses and activities will all be regulated as either Type II or Type III critical areas permits and must adhere to the requirements to be established herein. Attachment B 106November 4, 2026 G - 199 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 43 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 56 25-Aug-26 City Council Written Comment Buffers and indirect impacts Recommended treating buffers as part of the protection strategy because adjacent development could affect stormwater, sediment, temperature, groundwater, hydrology, wildlife movement, vegetation, noise, light, floodplain function, and salmon habitat. Buffers will always be considered as a required part of any proposed use or activity and are established within each applicable article. 57 25-Aug-26 City Council Written Comment Wetland-protection factors Recommended that wetland policy consider ecological function and value, size, condition, type, connectivity, development impacts, buffers, best available science, climate change, public benefits, existing development, Tribal treaty rights and cultural resources, and restoration opportunities. These considerations are currently drafted under Article III - Wetlands. 58 25-Aug-26 City Council Written Comment Critical aquifer recharge area controls Recommended prioritizing aquifer recharge protection and limiting activities that could contaminate groundwater, compact soils, create extensive impervious cover, alter drainage, or reduce infiltration. These considerations are currently drafted under Article IV - Critical Aquifer Recharge Areas. 59 25-Aug-26 City Council Written Comment Managed recharge and supplemental water Recommended clean stormwater infiltration and, where feasible, managed aquifer recharge to support a protected aquifer, municipal well, treatment, and supplemental or emergency residential supply, subject to hydrogeologic, water-quality, regulatory, and water-rights analysis. Many of these recommendations will need to be incorporated into the City's Stormwater section of code, which is managed by the Public Works and Utilities Department. Attachment B 107November 4, 2026 G - 200 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 44 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 60 25-Aug-26 City Council Written Question Private and public viewshed distinction Asked whether the CAO would distinguish private view enhancement from significant public scenic views and whether the two types of viewsheds should be identified separately. Separating private view enhancement from significant public views would be difficult to separate, as the parcels that contain trees and other vegetation are owned by various entities, including a mix of private and public ownership. Staff may consider separating the two with the addition of the Urban Forestry chapter, if capacity exists. 61 25-Aug-26 City Council Written Comment Viewshed standards Recommended allowing viewshed enhancement only where it does not compromise critical-area functions and values, favoring selective pruning, thinning, and carefully designed view corridors over extensive vegetation removal, with greater protection where vegetation supports slope stability, habitat, shoreline, or other critical-area functions. These considerations are currently drafted under section 15.22.080.A.4.h and 15.22.410.D. 62 25-Aug-26 City Council Written Comment City-led restoration and incentives Recommended City-led restoration of parks, rights-of-way, stormwater facilities, stream corridors, wetlands, and floodplains; prioritizing landscape-scale benefits; and offering landowners technical assistance, grants, permit help, recognition, and nonprofit partnerships. Comments acknowledged. Staff will await further guidance from leadership on these efforts. 63 25-Aug-26 City Council Written Comment Natural-resource expert engagement Requested a natural-resources and nonprofit roundtable so restoration experts could review the draft CAO before the public-comment stage, complementing the builder roundtable. An external stakholder group consisting of various natural resource professionals has been meeting regularly through these updates. Their Comments and quetsions are addressed within this matrix. Attachment B 108November 4, 2026 G - 201 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 45 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 64 25-Aug-26 City Council Written Comment Critical areas on private property Commented that private ownership should not exempt wetlands, streams, fish habitat, aquifer recharge areas, or other critical resources from CAO protection and recommended a local regulatory layer that respected lawful property rights. All landowners, regardless of type of ownership, are subject to the provisions of the critical areas protection standards. 65 25-Aug-26 City Council Written Comment Equitable urban-tree retention Recommended protecting high-value mature, native, habitat, riparian, and shade trees; evaluating canopy at the neighborhood scale; allowing reasonable removal of dead, diseased, hazardous, poorly located, or unavoidable trees; and directing City investment toward areas with low canopy. Comments acknowledged. These issues and more will be addressed through the development of the Urban Forestry Chapter. 66 25-Aug-26 City Council Written Comment Nonconforming structures Requested clarification of PAMC 15.22.060(C) so modification rights applied to a habitable existing structure and could not be used to remodel an uninhabitable structure while retaining nonconforming status. 15.22.060.C establishes regulation for existing structures that were outside of the previously established buffers, but with the new regulation, may be located within a critical area buffer. It provides a pathway for minor modifications of these lawfully established strucutres to occur, even if they are located in an area that would now be considered for full critical area review for a new development. Attachment B 109November 4, 2026 G - 202 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 46 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 67 25-Aug-26 City Council Written Comment Net ecological gain Recommended replacing or moving beyond no net loss toward net ecological gain because no-net-loss policy could shift rather than repair environmental impacts. Goals and policies in the recently adopted comprehensive plan indicate that critical areas regulations should strive for net ecological gain, but continue to meet no-net-loss of ecological functions and values. That said, wetland mitigation requirements give prefernce to re-establishment that results in a gain in wetland area and function, and fish and wildlife habitat conservation area mitigation must achieve equivalent or greater biologic and hydrologic functions. This regulation maintains a balance between what is feasible for local landowners while also striving for net gain when possible. 68 25-Aug-26 City Council Written Comment Watershed-scale mitigation Recommended keeping water and mitigation benefits within the affected watershed and maintaining healthy riparian forests rather than shifting mitigation outside the local system. Comments acknowledged and are incorporated within mitigation standards. 69 25-Aug-26 City Council Written Comment Restoration inventory and implementation capacity Recommended expanding restoration capacity and inventorying priority needs, including wildlife activity, Valley Creek, Ediz Hook, the former mill site and bluff toe, wetlands, aquifers, riparian habitat, pocket estuaries, the lagoon, culverts, fish passage, and invasive-species removal. Staff will await further guidance from Council on these efforts. 70 25-Aug-26 City Council Written Comment Priority-parcel acquisition Recommended establishing a program to identify and acquire priority parcels within critical areas for permanent conservation. Staff will await further guidance from Council on these efforts. Attachment B 110November 4, 2026 G - 203 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 47 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 71 25-Aug-26 City Council Written Comment Interactive and current public GIS Requested an interactive public map with switchable critical-area and FEMA layers and the ability for natural-resource staff to add field observations and baseline changes so the information remained current. These mapping features will be incorporated into the public-facing GIS imagery during implementation. 72 25-Aug-26 City Council Written Comment Clear and coordinated permitting Recommended clear, user-friendly requirements and applications, staff training, and coordination of local permits with state and federal permitting requirements. Internal training will be completed during implementation. Staff are always looking for ways to coordinate local permitting with state and federal requirements. 73 25-Aug-26 City Council Written Comment Emergency permit coordination Recommended formalizing communication among the City, County, Tribes, and state agencies when emergency shoreline protection was authorized and tracking completion through permit finalization and ownership changes. This can be addressed during the updates the the Shoreline Master Program with further guidance from Council. 74 25-Aug-26 City Council Written Comment Wetland regulatory hierarchy Requested a clear explanation of federal, state, and local wetland roles, including federal dredge-and- fill jurisdiction, state water-quality, shoreline and SEPA requirements, and local land-use, buffer, clearing, grading, and CAO controls. Cities are responsible for regulating wetlands at the local level, utilizing the guidance and oversight from the Department of Ecology and the US Army Corps of Engineers. Any Type II and above critical area permit will also trigger SEPA review, which is reviewed by Department of Ecology and other state agencies. The city has the ability to set buffer widths, local land use policies, clearing and grading regulations, and CAO requirements based on guidance from state and federal agencies. Attachment B 111November 4, 2026 G - 204 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 48 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 75 25-Aug-26 City Council Written Question Property notice and parcel encumbrance Asked how the City would notify appraisers, assessors, owners, buyers, and real-estate professionals about development limits and whether parcels would be formally flagged or encumbered when critical areas were present. Through properly and readily available mapping tools, appraisers, owners, etc. will be able to easily identify whether a parcel is likely to contain 76 25-Aug-26 City Council Written Comment Independent technical review Recommended an independent technical-review process in which the City defined the scope and selected or retained the reviewer, the applicant paid, conflict safeguards applied, peer review could be required, findings were transparent, and the City retained final decision authority. Section 15.22.170 established regulation for situations where the City may hire a third-party, independent review of development proposals at the expense of the applicant. 77 25-Aug-26 City Council Written Comment Scope of environmental impact analysis Recommended continuing analysis beyond a consultant's conclusion of no impact by evaluating affected functions, magnitude, duration, reversibility, worst-case conditions, cumulative development, climate- change conditions, uncertainty, and the consequences of mitigation failure. If the city feels an applicant's analysis does not comply with the regulations of the CAO, additional information may be requested for further review. Similarily, the provisions of 15.22.170 may come into place should a situation of this nature arise. 78 25-Aug-26 City Council Written Comment Tribal and resource-agency review Recommended a process to seek appropriate Tribal and resource- agency expertise for projects involving salmon, shorelines, habitat, cultural resources, or water quality without transferring the City's decision authority. Any project that involves SEPA or has the potential to impact a critical area or cultural resource is always routed to the appropriate Tribal and resource- agencies for their review and comment. Attachment B 112November 4, 2026 G - 205 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 49 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 79 25-Aug-26 City Council Written Question Director authority to waive report sections Asked why the Director could exempt particular sections of a critical-area report under PAMC 15.22.110(B). If, after review, the Director has determined that a full critical areas report is not required, due to either the nature of the proposal or the lack of a critical area near the project location, certain portions of the report requirements may be exempt. This would only apply in limited situations and after a complete review of the development submittal. Another example may be if a proposed project will have no impact on a critical area, the Director may exempt the mitigation and monitoring components of the report. 80 25-Aug-26 City Council Written Comment Critical-area report contents Recommended relabeling PAMC 15.22.110(B) as required report sections; including standard methodology, existing-condition, species, habitat, impact, water, ordinary-high-water-mark, geotechnical, and mitigation elements as applicable; and removing 'adversely' so all impacts were identified regardless of magnitude. 15.22.110.B has been relabeled as such to reduce confusion. Specific report requirements are established for each of the critical areas and contain items relevant to the applicable critical area. Adversely has been removed. 81 25-Aug-26 City Council Written Comment Consultant conflicts and report assumptions Recommended requiring a consultant no-conflict-of-interest declaration and City approval of material report assumptions before a technical report was finalized. Comment acknowledged. This can be addressed when specific circumstances arise. 82 25-Aug-26 City Council Written Comment Net ecological gain Recommended replacing the no-net- loss standard in PAMC 15.22.130 with net ecological gain. Staff have added the following: "or where feasible, enhancement of functions and values." Attachment B 113November 4, 2026 G - 206 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 50 of 60 Comments - City Council # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 83 25-Aug-26 City Council Written Comment Mitigation-completion encumbrance Recommended recording an encumbrance against the property until required mitigation was complete so the obligation survived a sale and the public investment was protected. This suggestion can be added as a condition to any permit during the permit review and issuance. Failure to comply with the mitigation requirements would be a violation of the property owner and subject to the enforcement provisions of PAMC. 84 25-Aug-26 City Council Written Comment Critical-area signs and fencing Requested examples of approved signs and fencing used to protect critical areas. Staff will be working on new signage during implementation and will share drafts with Planning Commission and Council as requested. 85 31-Aug-26 City Council Written Comment Pair groundwater wells with managed aquifer recharge Recommended pairing any future City groundwater-well project with aquifer recharge so high-flow recharge could support supplemental groundwater use during low Elwha River flows. Staff are prepared to coordinate with the Public Works Department on these efforts with future guidance from leadership. 86 31-Aug-26 City Council Written Question Watershed water-rights inventory and source options Asked whether the City could prepare a watershed inventory of water rights to identify options and the pros and cons of aquifer recharge, groundwater wells, and source switching during low Elwha River flows. Staff would need further direction from leadership, and capacity, to work on a project of this nature. 87 31-Aug-26 City Council Written Comment Regional water initiative and examples Noted that Washington’s Water Initiative was seeking community input and provided Kitsap and Sequim-Dungeness managed- aquifer-recharge examples for context. Comment acknowledged. Attachment B 114November 4, 2026 G - 207 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 51 of 60 Comments - Community Stakeholders # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 4-Aug-26 Stakeholder Verbal Question PAMC 15.02 — Development and restoration Asked whether restoration efforts or activities are included within the definition of “development” and suggested adding a formal definition of “restoration.” Restoration efforts are not considered under the umbrella of "development", however, they are subject to the exempt and allowed uses activities regulated under the proposed 15.22.070 and .080. A definition for restoration has been added. 2 4-Aug-26 Stakeholder Verbal Question PAMC 15.02 — Priority species Requested verification of the WAC citations and the source and reliability of information used in the “priority species” definition. The definition of "priority species" is from WAC 173-26-020(31). 3 4-Aug-26 Stakeholder Verbal Question PAMC 15.22.050 — Third-party review Asked what specific conditions trigger third-party review, who selects the reviewer, and what criteria the City uses to determine when review is required. 15.22.170 further establishes when third-party review may be warranted. The reviewer would be chose by the City, at the applican'ts expense, if a proposal does not adhere to the criteria established, or if there appear to be discrepencies with reporting based on institutional and local knowledge. 4 4-Aug-26 Stakeholder Verbal Question Professional disagreements and costs Asked who makes the controlling determination when technical experts disagree, how conflicting professional opinions are resolved, and who is responsible for associated review costs. See above response. 5 4-Aug-26 Stakeholder Verbal Question Land Capacity Analysis Requested additional explanation of how critical areas are accounted for or subtracted in the Land Capacity Analysis and how that relates to conclusions regarding development capacity. The land capacity analysis that was performed during the comprehensive plan periodic update did not take into consideration the acreage contained within critical areas. They were otherwise exempted from the land capacity analysis and not included in the conclusions regarding development capacity within the city. Attachment B 115November 4, 2026 G - 208 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 52 of 60 Comments - Community Stakeholders # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 6 4-Aug-26 Stakeholder Written Comment PAMC 15.02 — No net loss Suggested broadening the definition of “no net loss” beyond fish life and wildlife habitat to address ecosystem functions and values consistent with WAC 365-196-830(4). Comment acknowledged and addressed accordingly. 7 4-Aug-26 Stakeholder Written Comment PAMC 15.22.010(A) — Purpose Suggested revising the purpose statement to include protection and, where feasible, enhancement of critical-area functions and values, consistent with the 2023 amendment to RCW 36.70A.020(10). Comment acknowledged and addressed accordingly. 8 4-Aug-26 Stakeholder Verbal Comment PAMC 15.22.010 — Public trust / Aquatic resources Flagged the proposed public-trust language as a federal-water- regulation legal term. Comment acknowledged. 9 4-Aug-26 Stakeholder Verbal Question Regulatory flexibility and reasonable economic use Requested clarification of the extent of the City’s “limited flexibility” when applying critical-area requirements and what constitutes reasonable economic use of a property. The determination of "reasonable economic use" of a property would be decided by the hearing examiner. In most instances, a reaonable economic use may be considered a single-family residence, or potentially a mixed-use facility, depending on the underlying zone. "Limited flexibility" means that the regulations established in the CAO must be construed narrowly and are not intended to be interpreted in various ways. Attachment B 116November 4, 2026 G - 209 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 53 of 60 Comments - Community Stakeholders # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 10 4-Aug-26 Stakeholder Written Question PAMC 15.22.080(A)(4)(h) — Viewshed enhancement Requested identification of the Best Available Science supporting the 25- percent living-canopy thinning standard and explanation of how the standard protects shade, temperature, microclimate, and wildlife-screening functions. 25% removal of the living canopy of a given tree is based on industry practice developed by the International Society of Arboriculture for maintaining tree health and vigor. Most of the requests the City receives for viewshed enhancement are for trees located in geologically hazardous areas and are not adjacent to watercourses. In situations where that request may come into play, maintaining 75% of a tree's canopy will allow the tree to continue to provide the ecosystem services such as shade, temperature management, steep slope erosion control and bluff stability. 11 4-Aug-26 Stakeholder Verbal Question Conflicting regulations Asked which regulation controls when critical-area requirements conflict with another code provision and how such conflicts may affect future use or development of a property. In a situation where other provisions conflict with the CAO requirements, that which provides the greater protection of the critical area's functions and values takes precedence. This provision is found in 15.22.020.B. 12 4-Aug-26 Stakeholder Verbal Comment PAMC 15.22.020 — Applicability Suggested adding specific code cross-references or links to related provisions governing applicability and review. Links will be added as time permits prior to final adoption for easy reference. 13 4-Aug-26 Stakeholder Verbal Comment PAMC 15.22.030 — Critical-area maps Requested that procedures for updating critical-area maps and designations accommodate updated information, new sources, and changing site conditions. Internal procedures can be drafted outside of the CAO for how and when to update City maps, in coordination with the GIS department. Attachment B 117November 4, 2026 G - 210 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 54 of 60 Comments - Community Stakeholders # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 14 4-Aug-26 Stakeholder Verbal Question Qualified-professional standards Requested confirmation that qualified-professional determinations rely on recognized education, experience, certification, and licensing standards. Yes, qualified professionals must have a degree, certification, or experience in the field in which they are representing. 15 4-Aug-26 Stakeholder Verbal Comment PAMC 15.22.010 — Purpose Suggested combining or revising the purpose provisions to more clearly integrate environmental and habitat protection into the ordinance’s core purpose. Comment acknowledged. 16 4-Aug-26 Stakeholder Verbal Comment Reasonable-use criteria Suggested including environmental protection within the health, safety, and welfare criteria used to evaluate a reasonable-use request. Environmental protection is identified in 15.22.100.A.4 and A.5, which require the reasonable use exception to be consistent with the purpose and intent of the chapter and will result in no net loss of ecological functions and values. 17 4-Aug-26 Stakeholder Verbal Comment Wetland-buffer flexibility; Development and variance Raised concern about development and variance implications under the wetland-buffering options. Variances are processed as a Type III permit and must receive approval by the Hearing Examiner. These provisions are outlined in 15.22.100. 18 4-Aug-26 Stakeholder Verbal Comment PAMC 15.22.070(F)(1)(b) — Emergency reporting Suggested shortening the 30-day post-emergency reporting period because 30 days may be too long to adequately document and evaluate emergency work. Comment addressed. Staff have reduced the 30-day requirement to 14 days. Attachment B 118November 4, 2026 G - 211 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 55 of 60 Comments - Community Stakeholders # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 19 4-Aug-26 Stakeholder Verbal Question Mitigation procedures Requested clarification of how mitigation is proposed, reviewed, conducted, monitored, and managed, including responsibility for overseeing the process. Depending on what critical area is needing mitigation, specific mitigatoin standards are outlined in each applicable article. For example, wetland mitigation requirements must adhere to a mitigation plan that is consistent with the Wetland Mitigation in Washinton State - Part 2, developed by the Department of Ecology. Fish and Wildlife Habitat Conservation Areas must have a habitat management plan developed for any proposed use imapcting those areas. How a professional chooses to draft monitoring and oversight is up to the consultant, but must be approved by the city. 20 4-Aug-26 Stakeholder Verbal Question Applicant mitigation responsibilities Asked why the applicant bears responsibility for demonstrating that proposed mitigation meets ordinance requirements. The applicant is responsible for providing a mitigation plan for review by the city, who then determines if it meets the ordinance requirements. It is up to the applicant to hire a qualified professional who can develop a plan that is consistent with the ordinance, rather than having the city be responsible for the preparation of such plans. 21 4-Aug-26 Stakeholder Verbal Comment PAMC 15.22.090(C)(4)(f) — Stream crossings Suggested adding specific provisions addressing when and how directional boring beneath streams may be permitted and regulated. Comment acknowledged. 22 4-Aug-26 Stakeholder Verbal Question Mitigation banking Asked whether the City currently has, participates in, or intends to establish a mitigation bank and when mitigation banking may be used. The city does not currenlty have or participate in a mitigation bank within city limits. Attachment B 119November 4, 2026 G - 212 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 56 of 60 Comments - Community Stakeholders # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 23 4-Aug-26 Stakeholder Verbal Question PAMC 15.22.010(C) and (D) — Reasonable use Requested clarification of the meaning and application of “reasonable use” and suggested providing relevant case-law examples or implementation guidance to assist with future interpretation. Criteria for consideration as a "reasonable use" are set forth in Section 15.22.100. Do to the difficult nature of what is and is not defined as a reasonable use makes it hard to define, which is why the decision is to be made by the hearing examiner. 24 4-Aug-26 Stakeholder Written Question Critical-area map currency / draft status Asked whether the map is current or reflects the draft Critical Areas Ordinance updates. The land capacity analysis map was developed during the comprehensive plan periodic update and used existing critical areas designations, not the proposed draft CAO updates. Attachment B 120November 4, 2026 G - 213 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 57 of 60 Comments - Government Agencies # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 1 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment General — Draft CAO materials Indicated that the proposed amendments and supporting materials generally look good and that the Critical Areas Checklist and public notice were useful. More detailed Comments were limited because the Geologically Hazardous Areas article has not yet been drafted. Comment acknowledged. 2 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.02.010 — Qualified professional Recommended retaining the existing critical-area-specific qualification requirements rather than replacing them solely with general language concerning licensure, training, and experience. Noted that the proposed general language does not specify Washington licensure and that the existing language provides greater clarity regarding professionals reviewing geologically hazardous areas. Comment acknowledged and addressed accordingly. 3 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.02.010 — Technical scientist Recommended adding a definition of “technical scientist” because the term is used in PAMC 15.22.030(A). Comment acknowledged. Attachment B 121November 4, 2026 G - 214 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 58 of 60 Comments - Government Agencies # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 4 14-Aug-26 Washington Department of Natural Resources (DNR) Written Question PAMC 15.22.030(C) — Critical-area rating and classification Requested clarification of the rating categories used to classify critical areas and whether those categories correspond to known or suspected risk, no known risk, or unknown risk due to insufficient data. This section is a general statement that critical areas will be classified and rated based on the criteria of the subsection. Specific ratings will be based on the requirements of the applicable critical area as determined necessary by a qualified professional. 5 14-Aug-26 Washington Department of Natural Resources (DNR) Written Question PAMC 15.22.030(C) — Documentation of ratings Asked where City-determined critical- area ratings will be documented, including whether the information will be included in the permit or application record or recorded on the property title. Rating information will be included in the permit after a review of the application, as well as incorporated to any deed restrictions or title requirements. Specific protocols for ratings are outlined in the applicable critical area's article. 6 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.22.090 — Permitted uses or activities Recommended providing more specific requirements for reports or studies prepared by qualified professionals when critical-area permit review is required, or adding a cross-reference to the section containing those requirements. Cross-references added in 15.22.090.B.2. 7 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.22.110 — Critical Areas Report Expressed support for the proposed mitigation, monitoring, maintenance, and financial-guarantee requirements. Comment acknowledged. Attachment B 122November 4, 2026 G - 215 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 59 of 60 Comments - Government Agencies # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 8 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.22.120 — Minimum report requirements Recommended requiring critical-area reports to address stormwater management, grading and erosion, and the applicable factor of safety. Stormwater requirements are identified in 15.22.120.B.2. 9 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.22.150 — Title notice Recommended requiring notice to be recorded on the title of all properties containing critical areas, rather than limiting the requirement to properties containing designated critical-area tracts. Comment acknowledged. Staff will work with the City's Legal Department to ensure adequate languge is incorporated regarding a record on title. 10 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.22.150 — Critical-area tract fencing Noted that fencing may or may not be necessary to delineate a critical-area tract and suggested allowing the requirement to be determined based on site conditions. Comment acknowledged. 11 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment PAMC 15.22.160 — Field identification and markings Expressed support for the proposed field-identification and marking requirements. Comment acknowledged. 12 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment Geologically Hazardous Areas — Article to be drafted Noted that the Geologically Hazardous Areas article remains to be drafted and indicated an interest in reviewing the article when it becomes available. Comment acknowledged. Attachment B 123November 4, 2026 G - 216 Exhibit 3: MCA 26-0090 Public Hearing Staff Report Wednesday, September 23, 2026 | Page 60 of 60 Comments - Government Agencies # Date Commenter Comment (may be paraphrased or abridged) Staff Response / Recommendation 13 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment Geologically hazardous areas and natural resource lands Recommended considering references to the definition of geologically hazardous areas in WAC 365-190-120 and to the natural resource lands provisions in WAC 365-196-480 in the Comprehensive Plan, development regulations, Shoreline Master Program, or other applicable City documents. Comment acknowledged. 14 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment Geologic information and mapping Recommended consulting the Washington Geologic Information Portal for current geologic information and mapping relevant to the City’s planning and regulatory work. Comment acknowledged. 15 14-Aug-26 Washington Department of Natural Resources (DNR) Written Comment Geologic planning resources Recommended consulting the Washington Department of Natural Resources’ Geologic Planning resources during current or future Comprehensive Plan, development- code, Shoreline Master Program, and critical-area updates. Comment acknowledged. Attachment B 124November 4, 2026 G - 217 From:Lisa Hoffman To:Community and Economic Development Cc:City Clerk Subject:Public Comment on the Critical Areas Ordinance (CAO) Update Date:Thursday, September 10, 2026 7:16:55 AM [CAUTION - EXTERNAL EMAIL] Dear members of the City Council and Planning Commission, I am writing to formally log my strong opposition to the regulatory expansions requested by Deputy Mayor Navarra Carr during the August 25, 2026 city council work session regarding the Critical Areas Ordinance (CAO) updates. Specifically, I oppose proposals to blanketly prohibit development in critical areas, restrict industrial variances, and revive the overreaching standard of “net ecological gain.” Port Angeles is a historic blue-collar maritime community. Like many major, successful port cities across the Pacific Northwest-including Seattle, Tacoma, and Olympia-large portions of our active waterfront and downtown were intentionally built on artificial fill. This land was engineered specifically to serve as the economic backbone of our region. Treating our working, filled waterfront with the same restrictive regulations as an untouched, pristine wilderness ignores the reality of how our city was built and how it must function to survive. Our community is already struggling to recruit and retain sustainable businesses. Imposing aggressive environmental mandates that go far beyond state requirements will severely damage our local economy. If these proposals move forward, the resulting red tape will drive away future investment, stifle job creation, and hurt the families who rely on our working waterfront for their livelihoods. We cannot protect our future prosperity if we legally choke out our path to growth. While environmental stewardship is important, it must be balanced with economic reality. I urge the Planning Commission and City Council to reject Deputy Mayor Carr’s requests. Please maintain a balanced CAO that protects our environment without dismantling the marine businesses and industries that keep Port Angeles alive. Thank you for your time, consideration, and service to our community. Sincerely, Lisa Hoffman Attachment C 125November 4, 2026 G - 218 Christopher H. Fidler 306 E. Front St. #5, Port Angeles, WA 98362 City Council September 17, 2026 City of Port Angeles Dear Council Members: I write to you in three capacities: As a downtown business owner; as one of the many homeowners who overlook the “Welcoming Vista” property; and as someone very interested in our downtown’s physical and natural appeal given my former role directing the design, development, and construction of Field Arts & Event Hall. In reviewing the COPA Development Code Amendments slides presented to Council last month, I noted Slide 30 entitled Spotlight: View Enhancements “No topping, felling or removal of trees are allowed.” Naturally if such strict limitations become codified, eYorts to create a Welcoming Vista are essentially over. To be clear, peekaboo views created by selectively skirting or inter-limbing some of the trees as proposed in the Ten -Ye ar Plan will never produce a “vista”, particularly when viewed at 35 mph. Such work would be pointless and nearly impossible to adequately maintain after the initial pruning was complete. A far more eYective approach to view enhancement and one used by urban planners throughout the nation is Species Conversion. Species Conversion (Right Tree, Right Place) is often used to replace large, dense and fast- growing broadleaf trees with slow-growing, dwarf, or low-statue native species. This permanently maintains the view corridor without requiring constant pruning. Foresters gradually remove the existing foliage over a period of several years and strategically plant appropriate replacements in patterns that better ensure slope stability (versus the weak and chaotic root system currently in place). Utilizing GIS mapping, planners can place new trees to frame vistas rather than block them. The benefits to such an approach are obvious: 1. Selecting native low-growing species permanently resolves view obstruction while still maintaining a tree canopy. 2. Replacing declining or hazard trees prevents failures on the slope and Front Street, and diminishes the risk of damaging Red Lion buildings below and overhead power lines above. 3. Replacing invasive or inappropriate species with deep-rooted native plants further secures the slope and prevents erosion. uttxzhmLnt m 06#November 4, 2026 G - 219 I believe the positive impacts produced by unimpeded sightlines to the harbor and downtown waterfront district are enormous from the standpoint of civic pride and tourist attention (“stickiness”). However, such goals will never be realized if pursued as a piece- meal, ten-year, multiple-step, pruning exercise that halfway through loses supervisory and budgetary attention for other priorities and allows the existing vegetation to once again frustrate the view. I therefore ask Council to request additional information on Species Conversion from staY in the hope that such an approach is recognized as both valid and helpful for the purposes of the COPA Development Code Amendments in general and the Welcoming Vista proposal in particular. Best regards, Christopher H. Fidler Christopher H. Fidler cc: Sam Grello Jim Haguewood uttxzhmLnt m 065November 4, 2026 G - 220 From:Dan Williams To:Community and Economic Development Subject:Public Comment on MCA 26-0090 — Lang Heritage Homes Date:Monday, September 21, 2026 9:48:10 AM [CAUTION - EXTERNAL EMAIL] Dear Planning Commissioners: Please include this comment and its attachments in the record for the September 23, 2026 public hearing on the proposed Critical Areas Ordinance, MCA 26-0090. I am developing Lang Heritage Homes on West 10th Street. The growing wetland and its buffers have impaired the buildable area of our four remaining Phase 1 lots. We have installed sewer capacity and electrical infrastructure intended to support additional homes, subject to approvals. I am attaching a wetland delineation map and ask the City to consider the stormwater records and chronology I have previously provided. An existing stormwater pipe is within immediate reach of the four remaining lots. Please evaluate whether a connection is feasible, including the pipe’s ownership, capacity, elevation, connection requirements, and any treatment needed. Please provide the City’s determination in writing. I also ask staff for a written, lot-by-lot determination showing the wetland boundary, rating, buffer, building setback, and resulting buildable area. Please explain what evidence is needed to evaluate whether an artificial-feature exclusion applies and how existing stormwater discharges will be assessed. The stormwater design grant application deadline is September 30, seven days after this hearing. Please state whether the City can take any action toward an application by that date. If it cannot, please provide a written design and funding path for addressing the drainage conditions affecting Lang Heritage Homes. Sincerely, Dan Williams Angeles Building Services Inc Port Angeles WA 98363 Lang Heritage Homes Attachment C 128November 4, 2026 G - 221 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 1 MCA 26-0090 Exhibit 4 DATE: July 22, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 CAO Municipal Development Code Audit Questions and Responses SUMMARY In June 2026 staff presented an initial audit on current Title 15 municipal code amendment requirements related the 2025 Comprehensive Plan Periodic Update to the Planning Commission and Critical Areas Ordinance (CAO) Stakeholder Advisory Committee. During the discussion of necessary updates several clarifying questions were raised by the Commission and Committee. This memo serves to summarize those questions and provides guidance on what requirements from the state must be adopted in Title 15 of the municipal code (PAMC). The questions below are summarized and grouped by topic. Impact on Development, Housing Density, and Comprehensive Plan Goals Question 1: How might the proposed CAO amendments affect development capacity, housing goals, infill development, and Comprehensive Plan implementation? Staff Response: The proposed amendments will have minimal increased effects on development capacity, housing goals, infill development and Comprehensive Plan implementation. The existing CAO and environmental protections associated with PAMC Chapter 15.20 – Environmentally Sensitive Areas Protection will be modified to ensure that the protection standards meet the criteria defined by state agencies such as Washington Department of Fish and Wildlife and the Department of Ecology but will not go above and beyond those requirements. The City currently regulates development activities within the designated critical areas; this code update will evaluate whether the existing development standards continue to protect ecological functions and values and adjust those standards to 129November 4, 2026 G - 222 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 2 MCA 26-0090 Exhibit 4 ensure no net loss where necessary. Amended protections may appear as adjusted buffer widths or the requirement of additional mitigation measures if impacts to critical areas cannot be avoided. Current science finds that wide terrestrial buffers, a near continuous corridor of mature, native vegetation, and limits on in-water projects are all necessary to protect salmonid habitat functions in riparian areas. Protection standards are addressed in existing code. Development capacity and housing goals will not be significantly affected by the proposed amendments. Question 2: Can you distinguish between screening-level GIS overlap and actual loss of buildable area? Staff Response: The GIS maps available from local, state and federal agencies act as the first screening for potential overlap identifying potential critical areas. If it is identified that a critical area may be located within a project site, During the development application process the applicant is responsible for demonstrating be boundaries of a critical area and its buffer. A professional consultant may be necessary to accomplish this task. As an example: If there is a proposal to build a structure on a property that is located adjacent to a steep slope (geologically hazardous area), a geotechnical engineer is required to perform an analysis of the parcel and develop a site map that identifies the location of the top of the ravine and any applicable buffers and building setbacks for that location. This professional reporting ensures the proposed development either does not encroach within the buffer or the provision of mitigation measures are in place to ensure no net loss of the ecological functions and values. Mapping tools planned for development and publishing during the implementation step of this code update will be explicit in stating that the tools are for screening purposes only. This communication is particularly important in the identification of existing wetlands throughout the City. Not all wetlands are currently delineated or mapped and those that are not may need to be delineated prior to development activities. Question 3: Can we evaluate the impacts of Title 15 by zoning, future land use, parcel size, vacant or underutilized status, and remaining buildable envelope? Staff Response: During the 2025 Comprehensive Plan Periodic Update, the City performed a land capacity analysis that incorporated the existing critical areas within the entirety of the Port Angeles UGA. While it is unknown how new buffer requirements will 130November 4, 2026 G - 223 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 3 MCA 26-0090 Exhibit 4 affect the available building space on remaining developable parcels, the existing land capacity analysis can be a living document updated as critical areas and their associated buffers are delineated and mapped. Question 4: How can we ensure that every parcel intersected by a screening map is not characterized as having lost development capacity? Staff Response: In most scenarios, a landowner or developer could apply for what is called a “reasonable use exception” if the regulations set forth by the Critical Areas chapter would deny all use of a parcel. The Department of Commerce provides guidance on criteria that can be used for determining if a development application would qualify as a “reasonable use”: • No other reasonable economic use of the property has less impact on the critical area. • The proposed impact to the critical area is the minimum necessary to allow for reasonable economic use of the property. • The inability of the applicant to derive reasonable economic use of the property is not the result of actions by the applicant after the effective date of the regulation, or its predecessor. • The proposal does not pose an unreasonable threat to the public health, safety, or welfare on or off the development proposal site. • The proposal will result in no net loss of critical area functions and values consistent with the best available science. • The proposal is consistent with other applicable regulations and standards. Reasonable use exceptions provide a path forward that would allow for certain types of development to occur either within a critical area or its buffer, so long as it is only the minimal reasonable use of the property. This option does not limit development capacity in these areas but rather allows a path forward for a proposal if the development criteria are satisfied. Regulatory Compliance, Best Available Science, and Municipal Flexibility Question 5: What is legally required, what is best available science (BAS)-supported, and what remains a local policy or implementation choice? 131November 4, 2026 G - 224 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 4 MCA 26-0090 Exhibit 4 Staff Response: The City is required to update the critical areas ordinance utilizing the best available science as provided by state agencies with expertise in their area as a part of the mandated Growth Management Act 10-year periodic update of the city’s Comprehensive Plan giving special consideration to anadromous fish species. Two examples of required best available science updates according to the recommendations from the state agencies are provided below: • Fish and Wildlife Habitat Conservation Areas – WDFW is the lead agency for advising local governments on matters related to the FWHCAs. Their guidance, established in Riparian Ecosystems, Vol. 2: Management Recommendations, is to delineate riparian corridors within one Site Potential Tree Height (SPTH) to protect the full riparian ecosystem functions and values. SPTH is defined as “the average maximum height of the tallest dominant trees (200 years or more) for a given site class”. “200 years or more” refers to the approximate minimum age of old-growth forests, which reflects the underlying assumption that old-growth forest conditions are needed for full riparian ecosystem functions. The City has some flexibility on management recommendations within these areas, however, those protection standards and management decisions must lead to the eventual establishment of old-growth forests within our riparian areas. • Wetlands – Wetland guidance comes from the Department of Ecology’s Wetland Guidance for CAO Updates, October 2022. In this document, the Department of Ecology summarizes the protection of wetland functions as: avoid, buffer, compensate and secure. This means: 1. Avoid direct impacts to a wetland and its buffer to the extent practicable by allowing impacts only when these is no reasonable alternative. 2. Buffer wetlands from impacts of adjacent land use through the retention of vegetated upland surrounding the wetland. 3. Compensate for unavoidable impacts by requiring the replacement of wetland and/or buffer area and function through the restoration, creation, preservation, and/or enhancement of wetlands and/or their buffers. 4. Secure long-term protection of wetlands and their buffer areas through legal mechanisms. Port Angeles has some flexibility is determining what type of wetland buffering are implemented. Department of Ecology provides three alternatives for wetland buffering; Option 1 sets the width of the buffer based only on the wetland category as determined 132November 4, 2026 G - 225 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 5 MCA 26-0090 Exhibit 4 using the Wetland Rating System. This option provides the least amount of flexibility because it doesn’t take into account the potential impacts from land use, or the wetland’s functions. Option 2 sets the width of the buffer based on the wetland category and the intensity of the impacts from the proposed land use. For example, if a wetland is rated as a Category III wetland per the Wetland Rating System, but the potential impact on the wetland would be low, the buffer width would be set at 75 feet as compared with a land use that would have high impact on the wetland, which would require a 150-foot buffer. Option 3 provides the most flexibility. It sets the buffer width based on the Wetland Category, the potential impact the land use has on the wetland, and the wetland functions or special characteristics as determined through the rating system. If it is determined that the City selects option 2 or 3, there also lies some flexibility with determining which land uses would be classified as having low, moderate, and high impact. Another example of local policy is how an application is reviewed. Title 18.02 PAMC provides a permit “typing” system that determines the level of review, permit timing, and the responsible decision-maker. Procedures developed in this code amendment process will define certain allowed uses, exemptions, reasonable uses, and their associated permit and review types and timelines. Question 6: How does local knowledge, site-specific information, and professional judgement remain part of the review process? Staff Response: A professional assessment of the project site may be required by a qualified professional depending on the type of development proposed and the critical area that it impacts. That report is submitted as a part of a development permit application. The responsibility to demonstrate whether 1) critical areas are present or not, 2) any proposed development on a parcel that contains a critical area or its buffer will result in no net loss of functions and values, and 3) that any impacts to critical areas will be mitigated according to a mitigation plan lies with the applicant. Staff is responsible for reviewing the materials provided by the applicant and using local knowledge and expertise to determine if the reports and materials provided are accurate and representative of the parcels identified. Question 7: What is the correct wetland terminology? Staff Response: “Wetland” or “wetlands” means areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that 133November 4, 2026 G - 226 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 6 MCA 26-0090 Exhibit 4 under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. Wetlands may include those artificial wetlands intentionally created from non-wetland areas created to mitigate conversion of wetlands.” Question 8: Can the city compare Department of Ecology buffer options before recommending a final approach? Staff Response: A decision can be made on which wetland buffering option the city implements. The setbacks listed in each of the three options are not negotiable unless the city can produce its own documentation and analysis beyond the state’s existing BAS that meets or exceeds documented BAS. Please refer to the Wetland Buffering Analysis staff memo for more information on this topic. Private Property Burdens, Mapping Discrepancies, and Cost Impacts Question 9: Can you provide clarity around affected parcels, private property impacts, applicant costs, and City costs? Staff Response: Affected parcels and impacts to private property will be updates in the City’s GIS maps throughout this process. The impacts to private property will remain relatively the same, with the exception of any increased buffer widths that will be adopted based on the best available science. Regardless of the presence of a critical area on a parcel, a landowner or developer may apply for a critical area reasonable use exception or critical area variance if the proposed evaluation criteria are met. Application costs are determined in the City’s Master Fee Schedule. Costs associated with necessary environmental reporting vary depending on the qualified professional selected by the landowner. Question 10: Can staff clarify how public maps are used as screening tools and should not be used as final regulatory determinations? Staff Response: Amendments to the CAO include the addition of identification, classification, and rating of critical areas, which are not currently well-defined in current 134November 4, 2026 G - 227 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 7 MCA 26-0090 Exhibit 4 code. Proposed PAMC Section 15.22.030.A will clearly define the use of critical areas maps and what purpose they serve as screening tool to identify the potential location of critical areas. Proposed PAMC Section 15.22.030.B will require that actual site conditions must be determined through the performance of a field investigation as performed by a qualified professional. Question 11: Can staff address City, County, State, Federal, and consultant mapping discrepancies. Staff Response: Because each jurisdiction is responsible for managing it’s own GIS maps, there are existing discrepancies between various agencies. The City’s GIS mapping tool should be used for screening purposes first by both city staff and property owners investigating the development potential of a specific property in Port Angeles. The actual location of critical areas should be confirmed in the field during any development application process to officially determine if there is a critical area onsite. A delineation performed by a qualified professional and submitted to the City along with their proposal for development will be added to the City’s CAO GIS database. Because each agency providing CAO mapping has different staff capacity and documentation procedures, the time in which a submitted CAO survey is mapped can vary. The implementation step in the CAO code amendment workplan will establish procedures to better map existing and submitted CAO surveys for staff and public use. Question 12: Will applicants be responsible for offsite or landscape-scale analysis? Staff Response: Offsite or landscape-scale analysis will primarily be done as part of the reporting requirements, to be performed by a qualified professional. Implementation of mapping procedures will assist qualified professionals in determining larger landscape scale impacts. Exemptions, Appeals, and Practical Environmental Definitions Question 13: How are wetlands identified and when do mapped features require review? Staff Response: According to the definition provided by Department of Ecology wetlands are areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands 135November 4, 2026 G - 228 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 8 MCA 26-0090 Exhibit 4 generally include swamps, marshes, bogs, and similar areas. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway. Wetlands may include those artificial wetlands intentionally created from non-wetland areas created to mitigate conversion of wetlands. They are identified by a qualified professional, either a Wetland Professional, Wetland Professional in Training, or a biologist who has received training from the Washington Department of Ecology for Wetland Identification and Rating. When looking at whether or not an area is or could be a wetland, the professional will first perform a wetland assessment, where they will look at the soil types, existing vegetation, and presence or absence of saturated soils. The area being assessed must meet the specific criteria set forth in the identification and rating system established by Ecology to be classified, identified, and delineated as a wetland. Question 14: How are artificial or inadvertently created wetlands delt with? Staff Response: Inadvertently create wetlands are not defined as a wetland or wetlands. Wetlands do not include those artificial wetlands intentionally created from non-wetland sites, including, but not limited to, irrigation and drainage ditches, grass-lined swales, canals, detention facilities, wastewater treatment facilities, farm ponds, and landscape amenities, or those wetlands created after July 1, 1990, that were unintentionally created as a result of the construction of a road, street, or highway, The burden of proof remains with the landowner or developer to clearly demonstrate a wetland is artificial or inadvertently create. If it is found that the area would be classified as an artificial wetland as described above, then wetland-related critical area regulations would not apply. Question 15: Would previously platted properties qualify for transition provisions or exemptions if wetlands were found on site where none previously existed during the time of the original plat? Staff Response: The only inadvertently created wetlands that would be exempt from the provisions of the ordinance would be those that are created from non-wetland sites as described above in Question 15. The burden of proof is on the developer or landowner to demonstrate how those areas were created to the City. Previously platted property having not shown a wetland may still establish a functional wetland over time. This situation does not automatically exempt those properties from the wetland regulations set forth by the 136November 4, 2026 G - 229 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 9 MCA 26-0090 Exhibit 4 City. Question 16: How are piped streams and previously modified corridors evaluated? Staff Response: Several of the City’s urban stream corridors are currently culverted under vast stretches of roads and other land uses. In these heavily urbanized areas, it is important to consider the existing conditions to understand where opportunities may occur to protect whatever functions currently exist. In the case of culverted streams, keeping the potential open for habitat improvement and restoration down and upstream of the culvert and allowing for future daylighting projects are one way to address the current lack of function for those portions of the streams. Taking a more holistic approach and a landscape-scale view of the entire stream corridor involves not just looking at the lack of functions or values of segments. A key element to maintaining these urbanized riparian management zones is connectivity, both in and along streams. WDFW has many recommendations for urban riparian ecosystems that will be evaluated as the proposed code is further developed to include fish and wildlife habitat conservation areas. Question 17: Clarify appeal procedures and how conflicting expert opinions are resolved. Staff Response: Appeals for any decision will be consistent with PAMC Title 18, Article V, Sections 18.02.220 and 18.02.230. References: WA Department of Fish and Wildlife Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (https://wdfw.wa.gov/sites/default/files/publications/01987/wdfw01987.pdf) WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA Department of Transportation and WA Department of Fish and Wildlife, Washington Habitat Connectivity Action Plan (https://wdfw.wa.gov/sites/default/files/publications/02630/wdfw02630.pdf) WDFW Riparian Management Zone Checklist for Critical Areas Ordinance – Addendum (https://wdfw.wa.gov/sites/default/files/2023-08/rmr-cao-checklistaddendum.pdf) 137November 4, 2026 G - 230 MCA 26-0090 Phase 2 June COA Audit Q&A Memo Page 10 MCA 26-0090 Exhibit 4 Attachments: Attachment A: 2025 Land Capacity Analysis 138November 4, 2026 G - 231 MCA 26-0090 Exhibit 5 MCA 26-0090 Phase 2 Introduction Memo Page 1 DATE: May 27, 2026 TO: Planning Commission FROM: Planning Division RE: Planning Commission Phase 2 Introductory Memo SUMMARY Washington’s Growth Management Act (GMA) requires all cities and counties to designate and regulate “critical areas”, which are defined as wetlands, critical aquifer recharge areas used for potable water, fish and wildlife habitat conservation areas, frequently flooded areas, shorelines, and geologically hazardous areas. Critical areas perform key functions that enhance our environment and protect us from hazards, such as landslides, tsunamis, and floods. The many beneficial functions and values these areas provide include but are not limited to, water quality protection and enhancement, fish and wildlife habitat, flood storage, conveyance, and the slow release of flood waters, groundwater recharge and discharge, erosion control, and wave attenuation. Critical areas protection is essential to protect the public’s health and safety and is necessary to comply with state laws in Washington. The City of Port Angeles is required to update its Critical Areas Ordinance (CAO) in accordance with the state-mandated Comprehensive Plan Periodic Updates under the GMA. The proposed code updates are scheduled to be completed in accordance with state requirements prior to the end of 2026. A more detailed schedule is provided in this memo as Attachment 1. Phase 2 provides the City with an opportunity to ensure existing regulation meets protection standards and incorporates best available science as provided by state agencies such as Washington Department of Fish and Wildlife, Department of Ecology, and Washington Department of Natural Resources. These code updates provide the Planning Commission with the opportunity to assist staff in an in-depth audit and reorganization of the existing Title 15 of the Port Angeles Municipal Code (PAMC). The proposed updates will seek to reorganize and consolidate regulations to improve clarity and readability for internal and external users of the code. BACKGROUND AND PROJECT SCOPE Under the GMA (RCW 36.70.a) all cities and counties in Washington State are required to update their Comprehensive Plan in a 10 year cycle. Updates to the CAO is an additional requirement that ensures all state legislative requirements involving critical area protections and regulations during the previous 10-year period are incorporated into local municipal code regulations. The CED team also views this mandate as an opportunity to ensure Title 15 permitting and environmental compliance procedures match those of larger and more advanced municipalities in Western Washington . The proposed update will include a comprehensive audit and reevaluation of existing codes within Title 15 by the Planning Commission, consolidating critical areas review procedures and ensuring the code includes updates best available science and best management practices. 139November 4, 2026 G - 232 MCA 26-0090 Exhibit 5 MCA 26-0090 Phase 2 Introduction Memo Page 2 This code updated process began in April with a series of internal interdepartmental kick-off meetings to bring departments together and raise awareness of the goals and objectives of these code updates. The draft Goals and Objectives are included in this memo as Attachment 2. Interdepartmental coordination is essential for regulatory consistency and transparency and provides members of the development review team an opportunity to provide feedback on current permit review and areas that need improved clarity and simplify permitting processes. Title 15 currently generally labels Critical Areas as “Environmentally Sensitive Areas”. A main goal of this code update is to reduce confusion of both staff members and applicants, and to bring the City up to the standards used elsewhere in Washington State, where these areas are clearly defined as “Critical Areas”. For example, our stream ravines and marine bluffs are currently classified as “locally unique features”, when in fact, they should be defined as “geologically hazardous areas” based on their soils and slope. Geologically hazardous areas are one of the five Critical Areas as defined by WAC 365-190-030, along with wetlands, critical aquifer recharge areas, fish and wildlife habitat conservation areas, and frequently flooded areas. An analysis of thirteen (13) similar jurisdictions’ environmental code was performed to find a structure that allowed for the most clarity and simplicity. The layout and organization of the City of Anacortes provided the best structure for the proposed Title 15 Chapter and Sections. The proposed draft code structure is included in this memo as Attachment 3. The new code structure will maintain existing chapters of code relevant to the State Environmental Policy Act (SEPA), as well as the recently updated Flood Damage Prevention chapter that is proposed to be referenced in the Frequently Flooded Areas article of the Critical Areas Chapter. General definitions will be consolidated to a central chapter for easy reference, and general and administrative provisions will be clearly defined. Each critical area will receive their own article where specific identification methods, protection standards, and mitigation requirements will be clearly outlined. The Phase 2 update provides the City with an opportunity to develop a new chapter consolidating tree planting and maintenance regulations into a new Urban Forestry chapter. The chapter will enact recently adopted goals and policies set forth in the Climate Resiliency Plan, Strategic Plan, and the newly updated 2025 Comprehensive Plan related to ensuring a healthy urban forest. This phase is also taking place coincidentally with a project to develop an Urban Forestry Program that includes a citywide canopy and stream assessment. Implementation of the code will consist of the development of training and educational resources, a new dedicated city webpage for environmental programs and urban forestry to be made publicly available for residents, developers, and staff regarding best management practices and development standards in and adjacent to critical areas. This final step in the update process will commence as code updates move to City Council adoption. Materials will be made available on the City’s website and in City Hall. ATTACHMENTS Attachment 1 – CAO Update Workplan 140November 4, 2026 G - 233 MCA 26-0090 Exhibit 5 MCA 26-0090 Phase 2 Introduction Memo Page 3 Attachment 2 – CAO Update Goals and Objectives Attachment 3 – CAO Proposed Title Organization Attachment 4 – Department of Commerce CAO Regulation Checklist and Guidance 141November 4, 2026 G - 234 DATE: June 24, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Fish and Wildlife Habitat Analysis SUMMARY Existing Port Angeles Municipal Code (PAMC) Chapter 15.20 is reasonably strong at protecting individual habitat sites, but modern Washington Department of Fish and Wildlife (WDFW) Best Available Science (BAS) has shifted toward protecting ecological networks, connected populations, and landscape-scale ecosystem processes. That shift creates the most significant and defensible gaps between Chapter 15.20 and current fish and wildlife habitat science. Table 1 provides an overview of the various environmental protections standards set by the Washington Department of Fish and Wildlife, specific to their Priority Habitats and Species (PHS) list. Through this analysis, existing code was evaluated for consistency with the BAS found in the WDFW Riparian Ecosystems, Volume 2: Management Recommendations. Topics that were rated as having “strong” consistency were present throughout existing code and will require minimum amendments to meet BAS requirements. No recommendations for next steps have been provided for items with strong consistency because no next steps are necessary. “Potential Deficiency” was identified as being present in existing code but may need some updates to meet BAS standards. “Moderate Deficiency” was identified as lacking in context and “significant deficiency” was either missing entirely or was only mentioned but did not contain significant protection standards for protection. This analysis will be the driving factor for targeting those deficiencies as described below, with heavy emphasis on the significant and moderate deficiencies. Potential deficiencies will be addressed if needed, and those with strong consistency with BAS will be amended to improve clarity and readability if needed. Many of the topics identified under this analysis apply to protection standards that can be used for other critical areas, such as geologically hazardous areas and frequently flooded areas as these areas frequently overlap in our region. Critical Aquifer Recharge Areas, while mentioned as an environmentally sensitive area in current regulation, have no development standards associated with them, and were not analyzed. Moving forward, if MCA 26-0090 Exhibit 6 142November 4, 2026 G - 235 Port Angeles chooses to shift towards utilizing groundwater as a potable water source, it would be wise to include development standards and protection of these areas in this code update. Table 1: Gap Analysis by Environmental Protection Consideration | Source – WDFW Riparian Ecosystems, Vol. 2 Management Recommendations. HABITAT CONNECTIVITY, WILDLIFE CORRIDORS, AND LANDSCAPE SCALE CONSERVATION Analysis: One of WDFW's most explicit planning priorities is maintaining viable, connected populations over the long term through habitat and wildlife connectivity. WDFW's PHS program treats connectivity as a foundational conservation principle rather than an optional consideration. Chapter 15.20 currently recognizes: •fish habitat, •wildlife habitat, Environmental Topics BAS Consistency Observation Priority Species Protection Strong Present Riparian Habitat Protection Potential Deficiency Present Habitat Connectivity Significant Deficiency Core BAS Principle Wildlife Corridors Significant Deficiency Core BAS Principle Landscape-Scale Conservation Significant Deficiency Core BAS Principle Population Viability Moderate Deficiency Explicit Goal Anadromous Fish Protection Potential Deficiency Special Consideration Required Cumulative Impacts Moderate Deficiency Increasing BAS Emphasis Adaptive Management Potential Deficiency Recommended Climate Resilience Significant Deficiency Increasingly Incorporated in newly adopted CAOs MCA 26-0090 Exhibit 6 143November 4, 2026 G - 236 •stream corridors, •riparian habitat, •priority species habitat. The code primarily protects habitat as discrete sites with no requirements to evaluate: •corridor function, •habitat linkage areas, •wildlife movement pathways, •fragmentation effects, •migration routes, •dispersal corridors, •breeding movement pathways, •connectivity between habitat patches, •landscape permeability. Deficiency or Concern: This is the largest BAS gap in the entire chapter, as it relates to multiple management strategies and protection standards. Current environmentally sensitive area provisions protect habitat patches but lacks standards for identifying, maintaining, or restoring habitat connectivity necessary to support viable wildlife populations and movement across the landscape. The objective is to maintain functioning ecological systems rather than isolated habitat fragments. Chapter 15.20 PAMC largely assumes habitat can be protected by protecting the immediate site. Modern BAS indicates that many species decline even when habitat patches remain intact if movement pathways are severed. The chapter does not provide regulatory mechanisms for preserving wildlife movement corridors despite substantial scientific evidence that connectivity is necessary for long-term population persistence. Recommendations: Suggested edits would include the development of a monitoring and adaptive management program to ensure goals, policies and regulations are effectively protecting these areas. The establishment of a monitoring system would allow the City to better determine if protection standards lead to habitat connectivity and wildlife corridor preservation in the long-term. Systems need to be viewed as a whole rather than fragmented across the landscape, and development standards need to be updated to reflect the BAS as provided by WDFW. Wildlife corridors are closely related to habitat connectivity. The proposed code could reference the Washington Habitat Connectivity Action Plan to find specific recommendations for improving connectivity across the landscape. MCA 26-0090 Exhibit 6 144November 4, 2026 G - 237 Landscape-scale protection measures should incorporate full protection within one SPTH, identified using the site potential tree height (SPTH) mapping tool. This will protect Riparian Management Zones at the landscape scale, rather than on a parcel-by-parcel level, even if applications are reviewed on a parcel level. Additional recommendations for landscape- scale habitat conservation should utilize the Washington Habitat Connectivity Action Plan. While the City of Port Angeles alone may be too small to consider Landscape-Scale Habitat Conservation, efforts should be made to think about how the City connects to the UGA, and therefore the County, as well as the proximity to the landscape to the South (Olympic National Park). POPULATION VIABILITY Analysis: A major objective of the Priority Habitat Species program is maintaining healthy populations over time rather than simply preventing local habitat destruction. WDFW explicitly references maintaining or enhancing populations within current and historic ranges. The ordinance protects habitat but does not appear to require evaluation of whether: •local populations remain viable, •breeding populations remain connected, •cumulative habitat loss threatens population persistence. Deficiency or Concern: Habitat protection is treated as an end in itself rather than a means of sustaining populations. Chapter 15.20 PAMC lacks mechanisms for evaluating whether habitat protection results in viable populations of fish and wildlife. Recommendations: The establishment of a monitoring and adaptive management program would allow the City to evaluate whether the protection measures established are sufficient to maintain viable fish and wildlife populations over the long term. Without a monitoring program, there is no way to track viable populations. This would be a good opportunity to partner with local organizations who focus on habitat recovery in our region, as many of them already have monitoring programs in place. RIPARIAN HABITAT PROTECTION Analysis: Modern WDFW science views riparian habitat as ecological systems rather than simply stream buffers and places enormous emphasis on riparian functions such as: •shade, •large woody debris recruitment, •nutrient inputs, •bank stability, MCA 26-0090 Exhibit 6 145November 4, 2026 G - 238 •floodplain interaction, •wildlife movement. Chapter 15.20 PAMC contains protective guidance regarding: •stream temperature, •sedimentation, •woody debris recruitment, •streambank stability, •aquatic habitat. Deficiency or Concern: The code recognizes riparian functions but does not fully incorporate more recent riparian ecosystem science emphasizing: •floodplain connectivity, •riparian ecosystem processes, •site-potential tree height concepts, •watershed-scale function. Riparian protections generally align with BAS but do not fully incorporate modern riparian ecosystem management approaches developed since ordinance adoption. Recommendations: Protection standards will need to be updated to reflect BAS, specifically for maintaining riparian ecosystem processes using SPTH. This science can be applied to multiple critical areas protection standards, including geologically hazardous areas, fish and wildlife habitat conservation areas, and critical aquifer recharge areas. Full protection within one SPTH as determined by using the SPTH mapping tool is recommended. The City’s GIS layers will be updated through implementation to align with the SPTH map, primarily for fish and wildlife habitat conservation areas, and geologically hazardous areas, as the two generally overlap. ANADROMOUS FISH Analysis: Under the Growth Management Act, local governments must give special consideration to habitat associated with anadromous fisheries. WDFW repeatedly emphasizes salmonid habitat protection. The chapter contains extensive findings regarding: •spawning habitat, •fish eggs, •stream temperatures, •sedimentation, •aquatic habitat. MCA 26-0090 Exhibit 6 146November 4, 2026 G - 239 Deficiency or Concern: The code generally addresses salmonid concerns but predates many advances in salmon recovery science and recognizes salmonid habitat functions in the findings of the chapter. It does not fully incorporate current watershed-based salmon recovery strategies. Recommendations: Anadromous fish habitat includes the nearshore marine ecosystem, Port Angeles Harbor, and the six urban stream corridors found within the City. The protection and enhancement of these areas will involve incorporating management practices for anadromous fish habitat to be pulled from the WDFW Riparian Ecosystems, Volume 2: Management Recommendations. No net loss of ecological functions or values will be the foundational pillar for determining which management practices are included in development standards for all fish and wildlife habitat conservation areas, including habitat for anadromous fish. CUMULATIVE IMPACTS Analysis: Modern habitat science increasingly recognizes cumulative degradation as a major driver of species decline. The current ordinance is largely permit- and project-based with little evidence for requirements for: •cumulative habitat accounting, •cumulative fragmentation analysis, •watershed-level degradation assessments. Deficiency or Concern: The ordinance lacks procedures for evaluating cumulative habitat losses and fragmentation effects resulting from multiple development actions over time. Recommendations: Through the development of a monitoring and adaptive management program, the City will be able to better manage for the cumulative effects of habitat degradation and protection. Noting that fragmented landscapes lead to cumulative habitat loss, the best way to monitor the efforts of critical areas protection is through a monitoring and adaptive management program. Adaptive management relies on scientific methods to evaluate how well regulatory and nonregulatory actions achieve their objectives, and adjusts those programs accordingly. CLIMATE RESILIENCE Analysis: Although not prominent in the original PHS manuals, current WDFW conservation planning increasingly considers: •climate adaptation, MCA 26-0090 Exhibit 6 147November 4, 2026 G - 240 •shifting species distributions, •drought impacts, •thermal refugia, •resilience corridors. There is currently no mention or guidance on climate resiliency, hazard mitigation or adaptation provisions in Chapter 15.20 PAMC. Deficiency or Concern: The ordinance predates the City’s current Climate Resiliency Implementation Plan. The ordinance does not address climate-driven changes in habitat conditions, species distributions, hydrology, or ecosystem resilience. Recommendations: Incorporate climate-related specifics in the findings and purpose of the chapter. These can be pulled from the Climate Resiliency Action Plan as well as the Climate Resiliency and Hazard Mitigation Element of the 2025 Comprehensive Plan. Management strategies should also reflect BAS to protect and restore ecosystems to increase the resilience of species, habitats, and communities to climate change. Guidance from the Department of Commerce on Climate Resiliency efforts should be incorporated into the regulations and standards to ensure concurrency with long range environmental planning efforts. References: WA Department of Fish and Wildlife Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (https://wdfw.wa.gov/sites/default/files/publications/01987/wdfw01987.pdf) WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA Department of Transportation and WA Department of Fish and Wildlife, Washington Habitat Connectivity Action Plan (https://wdfw.wa.gov/sites/default/files/publications/02630/wdfw02630.pdf) WDFW Riparian Management Zone Checklist for Critical Areas Ordinance – Addendum (https://wdfw.wa.gov/sites/default/files/2023-08/rmr-cao-checklistaddendum.pdf) MCA 26-0090 Exhibit 6 148November 4, 2026 G - 241 DATE: June 24, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Wetlands Analysis SUMMARY In 2017, the City amended Port Angeles Municipal Code (PAMC) Chapter 15.24 - Wetlands to expressly adopt the Washington Department of Ecology wetland rating system requiring the use of the latest Ecology rating procedures. Specifically, Chapter 15.24.040(D)(3) PAMC states that the City "shall apply the latest version" of Ecology's Wetland Rating System and Field Methodology. In auditing the chapter using the Department of Ecology Wetland Guidance for Critical Areas demonstrated that there are still several areas where the code appears to be vulnerable from a Best Available Science (BAS) perspective. The strongest argument is that the current ordinance remains largely site-scale and project-scale, while contemporary wetland BAS increasingly requires protection of landscape-scale ecological processes, particularly habitat connectivity, cumulative impacts, and long-term resilience. Those are the areas where the gap between the ordinance and current science are most pronounced and will be the primary focus of the amendments moving forward. Any consistency that was found to be “Strong ” was not analyzed further as no recommended changes were deemed necessary. “Moderate” deficiencies contain some standards that are still relevant, but do not reflect current science in its entirety. “Significant” deficiencies are either lacking entirely from the ordinance or are present but do not meet current standards. Those deficiencies that were identified as significant will have the most recommendations for amendments moving forward, with moderate deficiencies requiring minimal amendments to meet current standards. MCA 26-0090 Exhibit 7 149November 4, 2026 G - 242 Environmental Topic BAS Consistency Observation Ecology Rating System Adoption Strong City adopts Ecology rating system. Mitigation Sequencing Strong Avoidance → minimization → rectification → compensation hierarchy is incorporated. Delineation Standards Strong Uses Ecology delineation manual. Functional Assessment System Moderate Deficiency Local methodology retained alongside Ecology system. Wetland Buffers Moderate Deficiency Several provisions appear tied to older assumptions and not clearly tied to Ecology's current buffer framework. Habitat Connectivity Significant Deficiency Little evidence of modern landscape-scale connectivity analysis. Climate Resilience Significant Deficiency No climate resilience provisions. Mitigation Moderate Deficiency Uses "best professional judgment" rather than current functional assessment tools and watershed approaches. Category I Wetlands Moderate Deficiency Less detailed than Ecology's modern emphasis on irreplaceable wetlands. Cumulative Impacts Significant Deficiency Little discussion of cumulative effects analysis. Table 1: Best Available Science Gap Analysis | Source: Department of Ecology Wetland Guidance for Critical Areas (2022). FUNCTIONAL ASSESSMENT SYSTEM Analysis: The most obvious BAS issue is in Section 15.24.045 PAMC. Although the City adopts Ecology's rating system, it simultaneously retains a local hydrology classification framework (Type 1, Type 2, Type 3, etc.) and a locally developed functional assessment methodology intended to align with Clallam County's approach. Wetlands are classified based on hydrology types and local habitat criteria in addition to Ecology's categories. Section 15.24.045 PAMC evaluates: • habitat diversity, • habitat types, • adjacent upland conditions, • documented species use, • management modifications. However, the 2014 Ecology Wetland Rating System places much greater emphasis on: MCA 26-0090 Exhibit 7 150November 4, 2026 G - 243 • landscape position, • watershed connectivity, • habitat corridors, • adjacent habitat integrity, • landscape context. Deficiency or Concern: Current wetland science increasingly recognizes that wetland value is strongly influenced by landscape-scale relationships rather than solely on-site conditions. The Port Angeles code appears largely parcel-oriented. The 2014 Ecology Wetland Rating System was specifically developed to replace many locally developed functional assessment methods because: • ratings are calibrated statewide, • functions are scored consistently, • buffers are linked to ecological performance, • habitat scores are standardized. A Growth Management Hearings Board challenge could argue that retaining parallel local functional assessment methods introduces subjectivity and potentially departs from Ecology's scientifically vetted methodology. Recommendation: Remove the City’s Local Functional Assessment System (15.24.045), adopt the state’s 2014 Wetland Rating System as the standard for functional assessments moving forward, and focus more on the science provided by Ecology that focuses on landscape-scale relationships. WETLAND BUFFERS Analysis: Port Angeles does use Category I-IV wetlands and applies associated buffer standards. However, the code largely relies on fixed regulatory categories and does not appear to require a project-specific analysis of: • landscape connectivity, • amphibian movement, • species-specific habitat requirements, • ecological network integrity. Chapter 15.24 PAMC protects wetlands primarily through category-based buffer assignments rather than through a comprehensive evaluation of habitat-function and connectivity considerations reflected in Ecology's current wetland rating methodology. MCA 26-0090 Exhibit 7 151November 4, 2026 G - 244 Deficiency or Concern: Existing buffer widths do not meet the current standards as defined in July 2018 Modified Habitat Score Ranges. Recommendation: Update the buffer standards using the Buffer Alternative 3 method as outlined in the July 2018 Modified Habitat Score Ranges prepared by the Department of Ecology. This method determines the buffer width based on the wetland category, intensity of impacts, wetland functions, or special characteristics. Table 2 shows the existing buffer regulations under PAMC and the recommended buffer widths following Buffer Alternative 3. Wetland Category Current Buffer Widths by Intensity Buffer Alternative 3 Widths by Intensity Category I Low Intensity - 200 ft High Intensity - 300 ft Low Impact - 150 ft Medium Impact - 225 ft High Impact - 300 ft Category II Low Intensity - 100 ft High Intensity - 200 ft Low Impact - 150 ft Medium Impact - 225 ft High Impact - 300 ft Category III Low Intensity - 50 ft High Intensity - 100 ft Low Impact - 75 ft Medium Impact - 110 ft High Impact - 150 ft Category IV Low Intensity - 25 ft High Intensity - 25 ft Low Impact - 25 ft Medium Impact - 40 ft High Impact - 50 ft Table 2: Buffer Widths Analysis using Buffer Alternative 3 method, by intensity. For the purposes of buffer determination, land use intensity ratings must be established. Currently, the City does not define land use intensity ratings for buffer requirements, which can lead to subjective decisions being made. Examples of some proposed land uses associated with each intensity rating are listed below. High Intensity – Commercial, Industrial, Residential development with >1 unit/acre, High- intensity Recreation. Medium Intensity – Residential development <1 unit/acre, moderate-intensity open space, paved trails, utility corridors with ongoing maintenance needs. Low Intensity – Low-intensity open space, unpaved trails, utility corridors with little or no vegetation management needs. MCA 26-0090 Exhibit 7 152November 4, 2026 G - 245 HABITAT CONNECTIVITY Analysis: The current Wetlands chapter lacks any explicit reference to habitat connectivity standards. Modern ecology guidance and peer-reviewed wetland science emphasize: • wildlife movement corridors, • connected wetland complexes, • amphibian migration routes, • salmon-supporting wetland networks, • regional biodiversity connectivity. Chapter 15.24 PAMC discusses habitat functions but there are no requirements for evaluating: • corridor fragmentation, • connectivity loss, • barrier effects, • regional habitat network degradation. Deficiency or Concern: This is one of the strongest BAS deficiencies because connectivity science has advanced substantially since many portions of the chapter were originally written. Recommendation: Modify reporting requirements to include habitat connectivity science in order to better evaluate fragmentation, connectivity loss and regional habitat network degradation from development. CLIMATE RESILIENCY Analysis: Climate resiliency and hazard mitigation are entirely absent, and the code provides no references to: • climate adaptation, • changing hydrology, • sea-level rise, • drought resilience, • increased storm intensity, • carbon sequestration functions. Deficiency or Concern: While Chapter 15.24 PAMC predates much of Washington's climate-resilience guidance, modern BAS increasingly identifies wetlands as critical climate infrastructure. This is becoming a common criticism of older critical areas ordinances. MCA 26-0090 Exhibit 7 153November 4, 2026 G - 246 Recommendation: Incorporate into the purpose the importance of wetland protection from a climate resiliency standpoint. Existing plans and policies point to their importance; the integration just needs to happen to align protections standards. MITIGATION Analysis: Section 15.24.070 PAMC relies heavily on: "best professional judgment of a qualified wetland ecologist" for determining functional replacement and mitigation success. Deficiency or Concern: Modern Ecology guidance increasingly favors: • standardized function assessment, • watershed-based mitigation planning, • mitigation banking, • in-lieu fee programs, • measurable performance standards. Reliance on professional judgment alone may create inconsistency. Recommendation: Provide guidelines for the “professional judgement” and reporting requirements that reflect the above concerns. Stricter reporting requirements for mitigation plans that meet current standards should be integrated. CATEGORY I WETLANDS Analysis: Ecology's 2014 rating system places strong emphasis on wetlands that are: • difficult to replace, • rare, • exceptionally high functioning, • of high conservation value. Port Angeles recognizes Category I wetlands, but much of the ordinance language still reflects the older "replace equivalent functions" framework rather than explicitly acknowledging that some wetlands cannot realistically be replaced. Deficiency or Concern: Replacement-based mitigation is often scientifically controversial for mature forested wetlands and rare wetland systems, such as those that meet the criteria of Category I and II wetlands. Recommendation: Update the wetland categories, especially Category I and II wetlands to reflect the current wetland types that are used by Ecology, and protection standards for MCA 26-0090 Exhibit 7 154November 4, 2026 G - 247 both that highlight their importance. Update the buffer requirements for Category I and II as defined in Table 2 to ensure the wetlands and their buffers remain intact. CUMULATIVE IMPACTS Analysis: The chapter is heavily focused on individual permit impacts. No comprehensive requirement to evaluate: • incremental wetland losses, • cumulative watershed degradation, • regional habitat fragmentation, • multiple buffer reductions, • repeated minor encroachments. Deficiency or Concern: Washington courts and Growth Management Hearings Boards increasingly recognize cumulative impacts as a BAS consideration. The code primarily evaluates project-by-project effects. Recommendation: Update the reporting requirements to include the cumulative impacts of development. Include mapping language and other ways of tracking and monitoring watershed degradation and incremental wetlands losses. Set the baseline for monitoring into the future. References: WA Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates (https://apps.ecology.wa.gov/publications/documents/2206014.pdf) WA Department of Ecology Washington State Wetland Rating System for Western Washington (https://apps.ecology.wa.gov/publications/documents/1406029.pdf) WA Department of Ecology Wetlands in Washington State Vol. 2: Guidance for Protecting and Managing Wetlands, July 2018 Modified Habitat Score Ranges (https://apps.ecology.wa.gov/publications/parts/0506008part3.pdf) WA Department of Ecology Characterizing Wetland Buffers in Washington State (https://apps.ecology.wa.gov/publications/documents/1706008.pdf) MCA 26-0090 Exhibit 7 155November 4, 2026 G - 248 DATE: August 26, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Wetlands Buffer Options Analysis SUMMARY In June 2026 staff presented an initial audit on current Title 15 municipal code amendment requirements related to the 2025 Comprehensive Plan Periodic Update to the Planning Commission and Critical Areas Ordinance (CAO) Stakeholder Advisory Committee (SAC). Several clarifying questions were raised specific to wetland buffering regulations. Current best available Science from the Washington Department of Ecology provides three options for setting the widths of wetland buffers. •Buffer Alternative 1 sets a fixed width based only on the wetland category. o Strengths: Very simplified buffering that does not require much analysis by staff. o Weaknesses: Provides very little flexibility. With no consideration to the potential impact of the proposed use, a single-family home would have the same buffer requirements as a large industrial building adjacent to the same wetland. All buffer widths would increase for all wetland categories, regardless of the intensity of the use. •Buffer Alternative 2 sets the width based on wetland category and the intensity of impacts from proposed changes in land use, providing some flexibility. A comparison of the existing buffer regulations and Buffer Alternatives 1 and 2 can be seen in Table 1. o Strengths: Provides more flexibility when it comes to setting buffer widths than Alternative 1. Low impact uses on category IV wetlands would have no change in buffer requirements from existing regulations. Buffer widths for low MCA 26-0090 Exhibit 8 156November 4, 2026 G - 249 impact uses on Category I wetlands would decrease as compared to current regulations. o Weaknesses: Nearly all buffer widths will increase and there is still no consideration of the actual function the wetlands provide during the assessment. • Buffer Alternative 3 sets the width based on wetland category, intensity of impacts, and wetland functions or special characteristics. This alternative also has two options for determining the widths of buffers when they are based on the score for habitat and provides three buffer widths based on habitat scores. o Strengths: Provides the greatest amount of flexibility. It looks at both the intensity of projects and uses and considers the function the wetland is providing. Low impact uses for Category IV wetlands would have the same buffer width requirement as existing regulations, and some Category III wetlands may see a reduction in buffer requirements for all proposed uses if the habitat score is low. With Category III and IV wetlands being the most common in the Port Angeles Urban Growth Area, this alternative results in lower buffer widths than what are currently required in similar situations. Category II wetlands may also see a buffer reduction, as there are multiple buffer widths offered depending on the levels of function for habitat. Wetland Category Existing Buffer Requirements Buffer Alternative 1 Buffer Alternative 2 Category I Buffers Low Intensity - 200 ft High Intensity - 300 ft 300 ft Low Impact - 150 ft Moderate Impact - 225 ft High Impact - 300 ft Category II Buffers Low Intensity - 100 ft High Intensity - 200 ft 300 ft Low Impact - 150 ft Moderate Impact - 225 ft High Impact - 300 ft Category III Buffers Low Intensity - 50 ft High Intensity - 100 ft 150 ft Low Impact - 75 ft Moderate Impact - 110 ft High Impact - 150 ft Category IV Buffers Low Intensity - 25 ft High Intensity - 25 ft 50 ft Low Impact - 25 ft Moderate Impact - 40 ft High Impact - 50 ft Table 1:Comparison of existing, Alternative 1 and Alternative2 buffer requirements for Category I, II, III and IV Wetlands from the 2018 Guidance on Widths of Buffers and Ratios for Compensatory Mitigation. MCA 26-0090 Exhibit 8 157November 4, 2026 G - 250 o Weaknesses: Requires greater scrutiny and analysis by qualified professionals during reporting and the ability of staff to determine whether the analysis was performed correctly. Additional site visits may need to be performed by staff, especially in situations where Category I and II wetlands are involved. • Buffer Alternative 3A provides a graduated scale of widths for buffers based on habitat scores. o Strengths: Whereas Buffer Alternative 3 works on a step-wise scale, using only three groupings of habitat scores (3-4, 5-7, and 8-9), Buffer Alternative 3A uses a graduated scale to reduce any potential contention that may result in up to a 50-foot buffer increase between scores, such as between a score of 4 and 5. o Weaknesses: There is no set scale for this option. It would be up to the City to determine how the gradient would be set, provided that the scale stays within the limits established from the scientific information that is currently available. Alternative 3 buffers widths are attached to this memo in Attachment A, for review. Careful consideration of all three alternatives will provide a wetland buffer evaluation system that works best for Port Angeles. Regardless of which alternative we choose, buffer widths will change from existing requirements based on the best available science as required by the State. RECOMMENDATION Staff are recommending the adoption of Buffer Alternative 3 as the preferred method for setting buffer requirements based on the best available science provided by the Washington Department of Ecology. This buffering option is also the preferred method by various other jurisdictions in Western Washington that share a similar historic reliance on natural resource economics and water transport due to their coastal or deep-water bay location, including City Of Bellingham, City of Anacortes, City of Aberdeen, City of Port Townsend, City of Tumwater, among others. Utilizing Buffer Alternative 3 would set the City of Port Angeles buffer requirements similar to above communities that share similar natural resource and critical area land use distributions as Port Angeles. Alternative 3 provides the greatest flexibility for evaluating buffer widths. It not only takes into consideration the impact the proposed land use would have on the wetland, but also MCA 26-0090 Exhibit 8 158November 4, 2026 G - 251 the level of function the wetland provides, which could result in a lower buffer requirement for some Category III wetlands, if they do not provide high quality habitat. References: WA Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates (https://apps.ecology.wa.gov/publications/documents/2206014.pdf) WA Department of Ecology Washington State Wetland Rating System for Western Washington (https://apps.ecology.wa.gov/publications/documents/1406029.pdf) WA Department of Ecology Wetlands in Washington State Vol. 2: Guidance for Protecting and Managing Wetlands, July 2018 Modified Habitat Score Ranges (https://apps.ecology.wa.gov/publications/parts/0506008part3.pdf) WA Department of Ecology Characterizing Wetland Buffers in Washington State (https://apps.ecology.wa.gov/publications/documents/1706008.pdf) MCA 26-0090 Exhibit 8 159November 4, 2026 G - 252 8C.2.3 Buffer Alternative 3: Width Based on Wetland Category, Intensity of Impacts, Wetland Functions, or Special Characteristics The third alternative provides the most flexibility by basing the widths of buffers on three factors: the wetland category, the intensity of the impacts (as used in Alternative 2), and the functions or special characteristics of the wetland that need to be protected as determined through the rating system. The recommended widths for buffers are shown in Tables 8C-4 to 8C-7. Using this alternative, a wetland may fall into more than one category in the table. For example, an interdunal wetland may be rated a Category III wetland because it is an isolated interdunal wetland, but it may be rated a Category II wetland based on its score for functions. Table 8C-4. Width of buffers needed to protect Category IV wetlands in western Washington (Buffer Alternative 3 for wetlands scoring less than 16 points for all functions). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use Other Measures Recommended for Protection Score for all 3 basic functions is less than 16 points Low - 25 ft Moderate – 40 ft High – 50 ft No recommendations at this time1 1 No information on other measures for protection was available at the time this document was written. The Washington State Department of Ecology will continue to collect new information for future updates to this document. If a wetland meets more than one of the characteristics listed in Tables 8C-4 to 8C-7, the buffer recommended to protect the wetland is the widest one. For example, if a Category I wetland (Table 8C-7) scores 8 points for habitat and 7 points for water quality functions, a 300-foot buffer is needed for land uses with high impacts because the widths needed to protect habitat are wider than those needed for the other functions. MCA 26-0090 Exhibit 8 160November 4, 2026 G - 253 Table 8C-5. Width of buffers needed to protect Category III wetlands in western Washington (Buffer Alternative 3 for wetlands scoring 16 - 19 points for all functions). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use Other Measures Recommended for Protection Moderate level of function for habitat (score for habitat 6 - 7 points)* *If wetland scores 8-9 habitat points, use Table 8C-6 for Category II buffers Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time Score for habitat 3-5 points Low - 40 ft Moderate – 60 ft High – 80 ft No recommendations at this time 1 MCA 26-0090 Exhibit 8 161November 4, 2026 G - 254 Table 8C-6. Width of buffers needed to protect Category II wetlands in western Washington (Buffer Alternative 3 for wetlands scoring 20 - 22 points for all functions or having the “Special Characteristics” identified in the rating system). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use (Apply most protective if more than one criterion is met.) Other Measures Recommended for Protection High level of function for habitat (score for habitat 8 - 9 points) Low - 150 ft Moderate – 225 ft High – 300 ft Maintain connections to other habitat areas Moderate level of function for habitat (score for habitat 6 - 7 points) Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time2 High level of function for water quality improvement and low for habitat (score for water quality 8 - 9 points; habitat less than 6 points) Low - 50 ft Moderate – 75 ft High – 100 ft No additional surface discharges of untreated runoff Estuarine Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time2 Interdunal Low - 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time2 Not meeting above characteristics Low - 50 ft Moderate – 75 ft High – 100 ft No recommendations at this time2 2 See footnote on the previous page. MCA 26-0090 Exhibit 8 162November 4, 2026 G - 255 Table 8C-7. Width of buffers needed to protect Category I wetlands in western Washington (Buffer Alternative 3 for wetlands scoring 23 points or more for all functions or having the “Special Characteristics” identified in the rating system). Wetland Characteristics Buffer Widths by Impact of Proposed Land Use (Apply most protective if more than one criterion is met) Other Measures Recommended for Protection Wetlands Of High Conservation Value Low - 125 ft Moderate – 190 ft High – 250 ft No additional surface discharges to wetland or its tributaries No septic systems within 300 ft of wetland Restore degraded parts of buffer Bogs Low - 125 ft Moderate – 190 ft High – 250 ft No additional surface discharges to wetland or its tributaries Restore degraded parts of buffer Forested Buffer width to be based on score for habitat functions or water quality functions If forested wetland scores high for habitat, need to maintain connections to other habitat areas Restore degraded parts of buffer Estuarine Low - 100 ft Moderate – 150 ft High – 200 ft No recommendations at this time3 Wetlands in Coastal Lagoons Low - 100 ft Moderate – 150 ft High – 200 ft No recommendations at this time3 High level of function for habitat (score for habitat 8 - 9 points) Low – 150 ft Moderate – 225 ft High – 300 ft Maintain connections to other habitat areas Restore degraded parts of buffer Interdunal wetland with high level of function for habitat (score for habitat 8 - 9 points). Low – 150 ft Moderate – 225 ft High – 300 ft Maintain connections to other habitat areas Restore degraded parts of buffer Moderate level of function for habitat (score for habitat 6 - 7 points) Low – 75 ft Moderate – 110 ft High – 150 ft No recommendations at this time3 High level of function for water quality improvement (8 – 9 points) and low for habitat (less than 6 points) Low – 50 ft Moderate – 75 ft High – 100 ft No additional surface discharges of untreated runoff Not meeting any of the above characteristics Low – 50 ft Moderate – 75 ft High – 100 ft No recommendations at this time3 3 See footnote on page 6. MCA 26-0090 Exhibit 8 163November 4, 2026 G - 256 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 13 Rating Form – Effective January 1, 2015 These questions apply to wetlands of all HGM classes. HABITAT FUNCTIONS - Indicators that site functions to provide important habitat H 1.0. Does the site have the potential to provide habitat? H 1.1. Structure of plant community: Indicators are Cowardin classes and strata within the Forested class. Check the Cowardin plant classes in the wetland. Up to 10 patches may be combined for each class to meet the threshold of ¼ ac or more than 10% of the unit if it is smaller than 2.5 ac. Add the number of structures checked. ____Aquatic bed 4 structures or more: points = 4 ____Emergent 3 structures: points = 2 ____Scrub-shrub (areas where shrubs have > 30% cover) 2 structures: points = 1 ____Forested (areas where trees have > 30% cover) 1 structure: points = 0 If the unit has a Forested class, check if: ____The Forested class has 3 out of 5 strata (canopy, sub-canopy, shrubs, herbaceous, moss/ground-cover) that each cover 20% within the Forested polygon H 1.2. Hydroperiods Check the types of water regimes (hydroperiods) present within the wetland. The water regime has to cover more than 10% of the wetland or ¼ ac to count (see text for descriptions of hydroperiods). ____Permanently flooded or inundated 4 or more types present: points = 3 ____Seasonally flooded or inundated 3 types present: points = 2 ____Occasionally flooded or inundated 2 types present: points = 1 ____Saturated only 1 type present: points = 0 ____Permanently flowing stream or river in, or adjacent to, the wetland ____Seasonally flowing stream in, or adjacent to, the wetland ____Lake Fringe wetland 2 points ____Freshwater tidal wetland 2 points H 1.3. Richness of plant species Count the number of plant species in the wetland that cover at least 10 ft 2. Different patches of the same species can be combined to meet the size threshold and you do not have to name the species. Do not include Eurasian milfoil, reed canarygrass, purple loosestrife, Canadian thistle If you counted: > 19 species points = 2 5 - 19 species points = 1 < 5 species points = 0 H 1.4. Interspersion of habitats Decide from the diagrams below whether interspersion among Cowardin plants classes (described in H 1.1), or the classes and unvegetated areas (can include open water or mudflats) is high, moderate, low, or none. If you have four or more plant classes or three classes and open water, the rating is always high. None = 0 points Low = 1 point Moderate = 2 points All three diagrams in this row are HIGH = 3points MCA 26-0090 Exhibit 8 164November 4, 2026 G - 257 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 14 Rating Form – Effective January 1, 2015 H 1.5. Special habitat features: Check the habitat features that are present in the wetland. The number of checks is the number of points. ____Large, downed, woody debris within the wetland (> 4 in diameter and 6 ft long). ____Standing snags (dbh > 4 in) within the wetland ____Undercut banks are present for at least 6.6 ft (2 m) and/or overhanging plants extends at least 3.3 ft (1 m) over a stream (or ditch) in, or contiguous with the wetland, for at least 33 ft (10 m) ____Stable steep banks of fine material that might be used by beaver or muskrat for denning (> 30 degree slope) OR signs of recent beaver activity are present (cut shrubs or trees that have not yet weathered where wood is exposed) ____At least ¼ ac of thin-stemmed persistent plants or woody branches are present in areas that are permanently or seasonally inundated (structures for egg-laying by amphibians) ____Invasive plants cover less than 25% of the wetland area in every stratum of plants (see H 1.1 for list of strata) Total for H 1 Add the points in the boxes above Rating of Site Potential If score is: 15-18 = H 7-14 = M 0-6 = L Record the rating on the first page H 2.0. Does the landscape have the potential to support the habitat functions of the site? H 2.1. Accessible habitat (include only habitat that directly abuts wetland unit). Calculate: % undisturbed habitat + [(% moderate and low intensity land uses)/2] = _______% If total accessible habitat is: > 1/3 (33.3%) of 1 km Polygon points = 3 20-33% of 1 km Polygon points = 2 10-19% of 1 km Polygon points = 1 < 10% of 1 km Polygon points = 0 H 2.2. Undisturbed habitat in 1 km Polygon around the wetland. Calculate: % undisturbed habitat + [(% moderate and low intensity land uses)/2] = _______% Undisturbed habitat > 50% of Polygon points = 3 Undisturbed habitat 10-50% and in 1-3 patches points = 2 Undisturbed habitat 10-50% and > 3 patches points = 1 Undisturbed habitat < 10% of 1 km Polygon points = 0 H 2.3. Land use intensity in 1 km Polygon: If > 50% of 1 km Polygon is high intensity land use points = (- 2) ≤ 50% of 1 km Polygon is high intensity points = 0 Total for H 2 Add the points in the boxes above Rating of Landscape Potential If score is: 4-6 = H 1-3 = M < 1 = L Record the rating on the first page H 3.0. Is the habitat provided by the site valuable to society? H 3.1. Does the site provide habitat for species valued in laws, regulations, or policies? Choose only the highest score that applies to the wetland being rated. Site meets ANY of the following criteria: points = 2 It has 3 or more priority habitats within 100 m (see next page) It provides habitat for Threatened or Endangered species (any plant or animal on the state or federal lists) It is mapped as a location for an individual WDFW priority species It is a Wetland of High Conservation Value as determined by the Department of Natural Resources It has been categorized as an important habitat site in a local or regional comprehensive plan, in a Shoreline Master Plan, or in a watershed plan Site has 1 or 2 priority habitats (listed on next page) within 100 m points = 1 Site does not meet any of the criteria above points = 0 Rating of Value If score is: 2 = H 1 = M 0 = L Record the rating on the first page MCA 26-0090 Exhibit 8 165November 4, 2026 G - 258 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 15 Rating Form – Effective January 1, 2015 WDFW Priority Habitats Priority habitats listed by WDFW (see complete descriptions of WDFW priority habitats, and the counties in which they can be found, in: Washington Department of Fish and Wildlife. 2008. Priority Habitat and Species List. Olympia, Washington. 177 pp. http://wdfw.wa.gov/publications/00165/wdfw00165.pdf or access the list from here: http://wdfw.wa.gov/conservation/phs/list/) Count how many of the following priority habitats are within 330 ft (100 m) of the wetland unit: NOTE: This question is independent of the land use between the wetland unit and the priority habitat. Aspen Stands: Pure or mixed stands of aspen greater than 1 ac (0.4 ha). Biodiversity Areas and Corridors: Areas of habitat that are relatively important to various species of native fish and wildlife (full descriptions in WDFW PHS report). Herbaceous Balds: Variable size patches of grass and forbs on shallow soils over bedrock. Old-growth/Mature forests: Old-growth west of Cascade crest – Stands of at least 2 tree species, forming a multi- layered canopy with occasional small openings; with at least 8 trees/ac (20 trees/ha ) > 32 in (81 cm) dbh or > 200 years of age. Mature forests – Stands with average diameters exceeding 21 in (53 cm) dbh; crown cover may be less than 100%; decay, decadence, numbers of snags, and quantity of large downed material is generally less than that found in old-growth; 80-200 years old west of the Cascade crest. Oregon White Oak: Woodland stands of pure oak or oak/conifer associations where canopy coverage of the oak component is important (full descriptions in WDFW PHS report p. 158 – see web link above). Riparian: The area adjacent to aquatic systems with flowing water that contains elements of both aquatic and terrestrial ecosystems which mutually influence each other. Westside Prairies: Herbaceous, non-forested plant communities that can either take the form of a dry prairie or a wet prairie (full descriptions in WDFW PHS report p. 161 – see web link above). Instream: The combination of physical, biological, and chemical processes and conditions that interact to provide functional life history requirements for instream fish and wildlife resources. Nearshore: Relatively undisturbed nearshore habitats. These include Coastal Nearshore, Open Coast Nearshore, and Puget Sound Nearshore. (full descriptions of habitats and the definition of relatively undisturbed are in WDFW report – see web link on previous page). Caves: A naturally occurring cavity, recess, void, or system of interconnected passages under the earth in soils, rock, ice, or other geological formations and is large enough to contain a human. Cliffs: Greater than 25 ft (7.6 m) high and occurring below 5000 ft elevation. Talus: Homogenous areas of rock rubble ranging in average size 0.5 - 6.5 ft (0.15 - 2.0 m), composed of basalt, andesite, and/or sedimentary rock, including riprap slides and mine tailings. May be associated with cliffs. Snags and Logs: Trees are considered snags if they are dead or dying and exhibit sufficient decay characteristics to enable cavity excavation/use by wildlife. Priority snags have a diameter at breast height of > 20 in (51 cm) in western Washington and are > 6.5 ft (2 m) in height. Priority logs are > 12 in (30 cm) in diameter at the largest end, and > 20 ft (6 m) long. Note: All vegetated wetlands are by definition a priority habitat but are not included in this list because they are addressed elsewhere. MCA 26-0090 Exhibit 8 166November 4, 2026 G - 259 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 16 Rating Form – Effective January 1, 2015 CATEGORIZATION BASED ON SPECIAL CHARACTERISTICS Wetland Type Check off any criteria that apply to the wetland. Circle the category when the appropriate criteria are met. Category SC 1.0. Estuarine wetlands Does the wetland meet the following criteria for Estuarine wetlands? The dominant water regime is tidal, Vegetated, and With a salinity greater than 0.5 ppt Yes –Go to SC 1.1 No= Not an estuarine wetland SC 1.1. Is the wetland within a National Wildlife Refuge, National Park, National Estuary Reserve, Natural Area Preserve, State Park or Educational, Environmental, or Scientific Reserve designated under WAC 332 -30-151? Yes = Category I No - Go to SC 1.2 Cat. I SC 1.2. Is the wetland unit at least 1 ac in size and meets at least two of the following three conditions? The wetland is relatively undisturbed (has no diking, ditching, filling, cultivation, grazing, and has less than 10% cover of non-native plant species. (If non-native species are Spartina, see page 25) At least ¾ of the landward edge of the wetland has a 100 ft buffer of shrub, forest, or un-grazed or un- mowed grassland. The wetland has at least two of the following features: tidal channels, depressions with open water, or contiguous freshwater wetlands. Yes = Category I No = Category II Cat. I Cat. II SC 2.0. Wetlands of High Conservation Value (WHCV) SC 2.1. Has the WA Department of Natural Resources updated their website to include the list of Wetlands of High Conservation Value? Yes – Go to SC 2.2 No – Go to SC 2.3 SC 2.2. Is the wetland listed on the WDNR database as a Wetland of High Conservation Value? Yes = Category I No = Not a WHCV SC 2.3. Is the wetland in a Section/Township/Range that contains a Natural Heritage wetland? http://www1.dnr.wa.gov/nhp/refdesk/datasearch/wnhpwetlands.pdf Yes – Contact WNHP/WDNR and go to SC 2.4 No = Not a WHCV SC 2.4. Has WDNR identified the wetland within the S/T/R as a Wetland of High Conservation Value and listed it on their website? Yes = Category I No = Not a WHCV Cat. I SC 3.0. Bogs Does the wetland (or any part of the unit) meet both the criteria for soils and vegetation in bogs? Use the key below. If you answer YES you will still need to rate the wetland based on its functions. SC 3.1. Does an area within the wetland unit have organic soil horizons, either peats or mucks, that compose 16 in or more of the first 32 in of the soil profile? Yes – Go to SC 3.3 No – Go to SC 3.2 SC 3.2. Does an area within the wetland unit have organic soils, either peats or mucks, that are less than 16 in deep over bedrock, or an impermeable hardpan such as clay or volcanic ash, or that are floating on top of a lake or pond? Yes – Go to SC 3.3 No = Is not a bog SC 3.3. Does an area with peats or mucks have more than 70% cover of mosses at ground level, AND at least a 30% cover of plant species listed in Table 4? Yes = Is a Category I bog No – Go to SC 3.4 NOTE: If you are uncertain about the extent of mosses in the understory , you may substitute that criterion by measuring the pH of the water that seeps into a hole dug at least 16 in deep. If the pH is less than 5.0 and the plant species in Table 4 are present, the wetland is a bog. SC 3.4. Is an area with peats or mucks forested (> 30% cover) with Sitka spruce, subalpine fir, western red cedar, western hemlock, lodgepole pine, quaking aspen, Engelmann spruce, or western white pine, AND any of the species (or combination of species) listed in Table 4 provide more than 30% of the cover under the canopy? Yes = Is a Category I bog No = Is not a bog Cat. I MCA 26-0090 Exhibit 8 167November 4, 2026 G - 260 Wetland name or number ______ Wetland Rating System for Western WA: 2014 Update 17 Rating Form – Effective January 1, 2015 SC 4.0. Forested Wetlands Does the wetland have at least 1 contiguous acre of forest that meets one of these criteria for the WA Department of Fish and Wildlife’s forests as priority habitats? If you answer YES you will still need to rate the wetland based on its functions. Old-growth forests (west of Cascade crest): Stands of at least two tree species, forming a multi-layered canopy with occasional small openings; with at least 8 trees/ac (20 trees/ha) that are at least 200 years of age OR have a diameter at breast height (dbh) of 32 in (81 cm) or more. Mature forests (west of the Cascade Crest): Stands where the largest trees are 80- 200 years old OR the species that make up the canopy have an average diameter (dbh) exceeding 21 in (53 cm). Yes = Category I No = Not a forested wetland for this section Cat. I SC 5.0. Wetlands in Coastal Lagoons Does the wetland meet all of the following criteria of a wetland in a coastal lagoon? The wetland lies in a depression adjacent to marine waters that is wholly or partially separated from marine waters by sandbanks, gravel banks, shingle, or, less frequently, rocks The lagoon in which the wetland is located contains ponded water that is saline or brackish (> 0.5 ppt) during most of the year in at least a portion of the lagoon (needs to be measured near the bottom) Yes – Go to SC 5.1 No = Not a wetland in a coastal lagoon SC 5.1. Does the wetland meet all of the following three conditions? The wetland is relatively undisturbed (has no diking, ditching, filling, cultivation, grazing), and has less than 20% cover of aggressive, opportunistic plant species (see list of species on p. 100). At least ¾ of the landward edge of the wetland has a 100 ft buffer of shrub, forest, or un -grazed or un- mowed grassland. The wetland is larger than 1/10 ac (4350 ft2) Yes = Category I No = Category II Cat. I Cat. II SC 6.0. Interdunal Wetlands Is the wetland west of the 1889 line (also called the Western Boundary of Upland Ownership or WBUO)? If you answer yes you will still need to rate the wetland based on its habitat functions. In practical terms that means the following geographic areas: Long Beach Peninsula: Lands west of SR 103 Grayland-Westport: Lands west of SR 105 Ocean Shores-Copalis: Lands west of SR 115 and SR 109 Yes – Go to SC 6.1 No = not an interdunal wetland for rating SC 6.1. Is the wetland 1 ac or larger and scores an 8 or 9 for the habitat functions on the form (rates H,H,H or H,H,M for the three aspects of function)? Yes = Category I No – Go to SC 6.2 SC 6.2. Is the wetland 1 ac or larger, or is it in a mosaic of wetlands that is 1 ac or larger? Yes = Category II No – Go to SC 6.3 SC 6.3. Is the unit between 0.1 and 1 ac, or is it in a mosaic of wetlands that is between 0.1 and 1 ac? Yes = Category III No = Category IV Cat I Cat. II Cat. III Cat. IV Category of wetland based on Special Characteristics If you answered No for all types, enter “Not Applicable” on Summary Form MCA 26-0090 Exhibit 8 168November 4, 2026 G - 261 MCA 26-0090 Exhibit 9 PLANNING COMMISSION MEETING Port Angeles, Washington August 26, 2026 This meeting was conducted as a hybrid meeting. CALL TO ORDER - REGULAR MEETING Chair Young called the regular meeting of the Port Angeles Planning Commission to order at 6:05 p.m. ROLL CALL Planning Commission Chair Steiger, Vice Chair Kiedrowski, Commissioners: Omega, Vogel. Members Absent: Commissioner Schorr, Mellema, Vanderlugt. Staff Present: Planning Supervisor Ben Braudrick, Natural Resources and Grant Administrator Coutney Bornsworth, Senior Development Services Specialist Pat Bartholick. COMMISSIONER INTRODUCTIONS Planning Commissioners introduced themselves to newly appointed Commissioner Omega. PUBLIC COMMENT John R., Resident Supports Façade Grant 26-0002. ADA improvements made for all future grants. AGENDA ITEMS Action Item: Action: Façade Grant 26-0002 Studio Bob. Planning Commission review of façade grant proposal for façade updates (paint and highlight historic art deco architectural features restoration) at Studio Bob and Sound Bikes and Kayaks, 118 E Front St, Port Angeles, WA 98362. It was moved by Kiedrowski and seconded by Vogel to: Approve funding for Façade Improvement Grant 26-0002, citing 7 findings, 2 conclusions, and 8 conditions in the staff report. Motion carried 4-0. Action Item: MCA 26-0090 Wetlands Buffer Options Analysis. Staff presentation on wetland buffering regulations. Planning Commission action to recommend the preferred alternative for the wetland buffers. It was moved by Omega and seconded by Vogel to: Select Option 3 as the preferred Wetland Buffer methodology It was moved by Steiger and seconded by Vogel to Amend the motion to also include exceptions listed from WAC 365-195-915 Motion carried 3-1, with Kiedrowski dissenting. Amended Motion: Select Option 3 as the preferred Wetland Buffer methodology and include exceptions listed from WAC 365-195-915. Motion carried 3-1, with Kiedrowski dissenting. Discussion: MCA 26-0090 Critical Areas Ordinance Update. Staff presentation and Planning Commission discussion of Phase 2 of the development code updates to Titles 11, 13, and 15 of the municipal code with the proposed amended code. 169November 4, 2026 G - 262 CITY OF PORT ANGELES PLANNING COMMISSION – August 26, 2026 Page 2 of 3 Changes for Title 15 suggested by the Planning Commission: Section 15.02.010: Add definition to scientific expert and remove the definition for qualified professional. Section 15.22.230.B.: Missing Sections 3 and 7. Section 15.22.230.B.4: strike the words “do not” and add the word “minimize”. Section 15.22.280: Request to review aquifer recharge map prior to finalization. Section 15.22.290.A.1: change “and” to “or”. Section 15.22.310: Concern over level of analysis for expansion of existing use. Section 15.22.360: Missing point “d”. Section 15.22.410.D: Clarification tree replacement as an enforcement issue. Section 15.22.450.A.8: How will staff define locally important habitat areas? Section 15.22.480.E: Change “EMZ” to “RMZ”. STAFF UPDATES Customer Service Report None given. Monthly Type 0/Over the Counter Report None given. Monthly 5290 Report Licensing Administrator and Building Inspector Jackson gave a brief report on the 5290 permitting timelines for July 2026. Monthly Affordable Housing Report None given. Monthly Natural Resources Report The City is reviewing two SEPA checklist applications for the Port Angeles School District. Monthly Land Use Permitting and Economic Development Report None given. Monthly Building Report Senior Development Services Specialist Bartholick gave the July 2026 building report, which showed 56 building permits were issued. Quarterly Business Licensing Report None given COMMISSION REPORTS No reports given due to time constraints. 170November 4, 2026 G - 263 CITY OF PORT ANGELES PLANNING COMMISSION – August 26, 2026 Page 3 of 3 COMMISSION REPORTS None given. SECOND PUBLIC COMMENT John R., Resident Did the City get any feedback on the proposed CAO update from qualified professions. Concerned about the accuracy of the various critical area maps from federal, state, and local agencies. Provided an editorial from the Seattle Times about construction costs. ADJOURNMENT Chair Stieger adjourned the meeting at 7:45 p.m. _____________________________________ _______________________________ Chair Steiger, Chair Ben Braudrick, Secretary 171November 4, 2026 G - 264 Development Code Amendment Project Phase 2 : Critical Areas Ord. & Urban Forestry Stakeholder Committee Meeting 1 Kick off Agenda June 2 , 2026, 3:00 – 4:00 PM Location: Vern Burton Meeting Rooms 321 E 5th St., Port Angeles, WA 98362 Objectives •Stakeholder Orientation to Phase 2 of the Critical Area Ordinance and Urban Forestry Amendment Project. •Overview of Project Scope and Steps. •Discuss Roles and Responsibilities of Stakeholders during the scope of the project. •Discussion of future meeting participation, reoccurrence, and location. Meeting Schedule 3:00 PM Presentation of Phase 2 Amendment Goals and Objectives Kickoff and Introduction to the Critical Areas Ordinance, Scope Overview and Goals and Objectives of the updates. •Ben Braudrick & Courtney Bornsworth 3 :4 0 P M Code Updates Discussion Discuss CAO Checklist from Department of Commerce •All participants 3:50 PM Discussion of future meeting participation, reoccurrence, and location •All participants 4:00 P M Adjourn S takeholders Invited: Melissa Voltz, Lower Elwha Klallam Tribe Ian Miller, Washington Sea Grant Melissa Williams, Feiro Marine Life Center (Olympic Coast Exploration Center) Jesse Waknitz, Port or Port Angeles Angela Glore, Strait Ecosystem Recovery Network Sam Grello, Port Angeles Waterfront District Colleen McAleer, Clallam EDC Mitch Koonz, Clallam EDC Amber Dewey, North Peninsula Building Association Susannah Spock, FutureWise MCA 26-0090 Exhibit 10 172November 4, 2026 G - 265 Development Code Amendment Project Phase 2: Critical Areas Ord. & Urban Forestry Stakeholder Committee Meeting 2 Agenda June 30, 2026, 3:00 – 4:00 PM Location: Vern Burton Meeting Rooms 321 E 5th St., Port Angeles, WA 98362 Objectives • Overview and discussion of the Wetland and Critical Habitat code audit Meeting Schedule 3:00 PM Presentation of Phase 2 Code Audit Presentation and discussion of the critical area code audit • Courtney Bornsworth 3:50 PM Discussion of future meeting dates and agendas • All participants 4:00 PM Adjourn Stakeholders Invited: Melissa Voltz, Lower Elwha Klallam Tribe Ian Miller, Washington Sea Grant Melissa Williams, Feiro Marine Life Center (Olympic Coast Exploration Center) Jesse Waknitz, Port or Port Angeles Chris Hartman, Port or Port Angeles Angela Glore, Strait Ecosystem Recovery Network Sam Grello, Port Angeles Waterfront District Sarah Doyle, North Olympic Salmon Coalition Colleen McAleer, Clallam EDC/Port of Port Angeles Mitch Koonz, Clallam EDC Jim Haguewood, Port Angeles Association of Realtors/Waterfront District Amber Dewey, North Peninsula Building Association Susannah Spock, FutureWise Cheryl Baumann, NOPLE MCA 26-0090 Exhibit 10 173November 4, 2026 G - 266 Development Code Amendment Project Phase 2: Critical Areas Ord. & Urban Forestry Internal Stakeholder Committee Meeting 3 Agenda August 4, 2026, 3:00 PM– 4:30 PM Location: Vern Burton Meeting Rooms and Online 321 E 5th St., Port Angeles, WA 98362 Objectives • Discuss Title 15 Code Amendments To-Date • Discuss next steps and possible meeting #4 in September Meeting Schedule 3:00 PM Discussion of Chapter 15.02 - Definitions • Courtney Bornsworth • All 3:10 PM Discussion of Article I – General Provisions Special attention and time will be given to the exemptions, allowed uses, and permitted uses sections. • Courtney Bornsworth • All 3:30 PM Discussion of Article II – Critical Areas Review Procedures Focus on report requirements and mitigation. • Courtney Bornsworth • All 4:00 PM Adjourn Stakeholders Invited: Melissa Voltz, Lower Elwha Klallam Tribe Ian Miller, Washington Sea Grant Melissa Williams, Feiro Marine Life Center (Olympic Coast Exploration Center) Chris Hartman, Port of Port Angeles Teagan Darmody, Strait Ecosystem Recovery Network Sam Grello, Port Angeles Waterfront District Colleen McAleer, Clallam EDC/Port of Port Angeles Mitch Koonz, Clallam EDC Jim Haguewood, Port Angeles Association of Realtors/Waterfront District Amber Dewey, North Peninsula Building Association Susannah Spock, FutureWise Cheryl Baumann, NOPLE MCA 26-0090 Exhibit 10 174November 4, 2026 G - 267 Critical Areas Checklist A Technical Assistance Tool f rom Growth Management Services – updated May 2024 Name of city or county: City of Port Angeles Staff contact, phone, and e-mail address: Courtney Bornsworth, 360 -582-6449, cbornsworth@cityofpa.us INSTRUCTIONS This checklist is intended to help local governments update their development regulations, pursuant to the schedule in RCW 36.70A.130(5). We strongly encourage but do not require jurisdictions to complete the checklist and return it to Growth Management Services (GMS), along with their updates. However, If the jurisdiction is using a portion of their Periodic Update Grant (PUG) to update the Critical Areas Ordinance, this checklist is required. This checklist may be used by all jurisdictions, including those local governments planning for resource lands and critical areas only. For general information on update requirements, refer to A Guide to the Periodic Update Process Under the Growth Management Act – Fully Planning Counties & Cities, 2022 and WAC 365-196-610 . For additional information, resources , and general checklists pertaining to comprehensive plan and development regulation periodic updates please visit Commerce’s Growth Management Act Periodic Update webpage. Bold items are a GMA requirement or may be related requirements of other state or federal laws . Underlined items are links to Internet sites and may include best practices or other ideas to consider. Commerce WAC provisions are advisory under Commerce’s statutory mandate to provide technical assistance, RCW 43.330.120 which states that the Department of Commerce “…shall help local officials interpret and implement the different requirements of the act through workshops, model ordinances, and information materials .” If you have questions, call GMS at (360) 725-3066. 0BHow to fill out the checklist Using the current version of your critical areas regulations, fill out each item in the checklist. Select the check box or type in text fields, answering the following question: Is this item addressed in your current Critical Areas Ordinance (CAO)? If YES, fill in the form with citation(s) to where in the plan or code the item is addressed. We recommend using citations rather than page numbers because they stay the same regardless of how the document is printed. If you have questions about the requirement, follow the hyperlinks to the relevant statutory provision or rules. If you still have questions, visit the Commerce Growth Management Services Web page or contact one of the Commerce planners assigned to your region. C ONTENTS I n s t r u c t i o n s ………. . …………. …. 1 Overall Requirements………..2 We t l a n d s …………………………….3 Critical Aquifer Recharge A r e a s ……………………………. ……5 Frequently Flooded Areas….6 Geologically Hazardous A r e a s …………………………………. 7 Fish and Wildlife Habitat Conservation Areas….………..8 Designating and Protecting Waters of the Sta t e ……. . ….....9 A nadromous F i s h e r i e s ………………………….....10 Reasonable Use Exceptions…………………….…….10 Agricultural Activities…….…. .11 Forest Practices R e g u l a t i o n s ……………………....11 G o o d I d e a s ……. ……. . ……….….12 LOCAL GOVERNMENT DIVISION GROWTH MANAGEMENT SERVICES MCA 26-0090 Exhibit 11 175November 4, 2026 G - 268 CRITICAL AREAS Regulations protecting critical areas are required by RCW 36.70A.060(2) and RCW 36.70A.172(1). WAC 365-195-900 through 925 provide guidelines . Guidance can also be found in Commerce’s Critical Areas Handbook (2022); the Minimum Guidelines WAC 365-190-080 through 130; Best Available Science WAC 365-195; and Procedural Criteria , WAC 365-196-485 and WAC 365-196-830, and on Growth Management’s Critical Areas webpage. Regulations required to protect critical areas Addressed in current plan or regulations? If yes, note where OVERALL REQUIREMENTS The CAO includes best available science to clearly designate and protect all critical areas that might be found within the jurisdiction. 1. Designation of Critical Areas RCW 36.70A.170(1)(d) requires all counties and cities to designate critical areas. RCW 36.70A.170(2) requires that counties and cities consider the Commerce Minimum Guidelines pursuant to RCW 36.70A.050. RCW 36.70A.050 directs Commerce to adopt the Minimum Guidelines to classify critical areas. WAC 365-190-080 through 130 provide guidance on defining or “designating” each of the five critical areas. WAC 365-190-040 outlines the process to classify and designate natural resource lands and critical areas. 2. Definition of Critical Areas RCW 36.70A.030(11) provides definitions for critical areas . Sections (20) regarding geologically hazardous areas; and (48) regarding wetlands were updated in 2010. WAC 365-190-030 provides definitions in the Minimum Guidelines. 3. Protection of Critical Areas RCW 36.70A.060(2) requires counties and cities to adopt development regulations that protect the critical areas required to be designated under RCW 36.70A.170. RCW 36.70A.172(1) requires the inclusion of best available science in developing policies and development regulations to protect the functions and values of critical areas. In addition, counties and cities must give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries. WAC 365-196-830 provides guidance on protection of critical areas. W as BAS documented in the record for the review and updates to the critical areas regulations? ☒ Yes ☐ No Location in Text: 15.22.010 - Purpose 15.22 .020 - Applicability Do your regulations address no net loss and require compensatory mitigation? ☒ Yes ☐ No Location in Text: 15.22.040 – Protection of critical areas and best available science. 15.22.050 – Project evaluation. 15.22.130 – Mitigation sequencing. 15.22.140 – Mitigation plan requirements. MCA 26-0090 Exhibit 11 176November 4, 2026 G - 269 4. Inclusion of Best Available Science RCW 36.70A.172(1) requires inclusion of the best available science (BAS). WAC 365-195-900 through 925 outlines recommended criteria for determining which information is the BAS, for obtaining the BAS, for including BAS in policies and regulations, for addressing inadequate scientific information, and for demonstrating “special consideration” to conservation or protection measures necessary to preserve or enhance anadromous fisheries. WAC 365-195-915 provides criteria for including BAS in the record. 5. No net loss of critical area functions and values is a requirement for development regulations in WAC 365-196-830(4). If development regulations allow harm to critical areas, they must require compensatory mitigation of the harm. WETLANDS DEFINITION The definition of wetlands is consistent with RCW 36.70A.030(48). Is the wetland definition consistent with RCW 36.70A.030(48)? ☒ Yes ☐ No ☐ N/A Location in Text: 15.02.010 - Definitions MCA 26-0090 Exhibit 11 177November 4, 2026 G - 270 WETLANDS DELINEATION Wetlands are delineated using the approved federal wetland delineation manual and applicable regional supplements in accordance with WAC 173-22-035. See Ecology’s Wetland Delineation page and WAC 365-190-090 for additional assistance. Are wetlands delineated using the approved Federal Wetland Delineation Manual and Regional Supplements? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.220.B WETLANDS PROTECTION Policies and regulations protect the functions and values of wetlands. RCW 36.70A.172(1). Counties and cities are encouraged to make their actions consistent with the intent and goals of “protection of wetlands”, Executive Order 89 -10 as it existed on September 1, 1990. WAC 365-190-090(3) recommends using a wetlands rating system that evaluates the existing wetland functions and values to determine what functions must be protected. Ecology updated its recommended wetlands rating systems effective January 2015. For information on the rating system, including the July 2018 adjustments to ranges for habitat scores, see: • 2014 Updates to the Washington State Wetland Rating Systems • Washington State Wetland Rating System for Western Washington • Washington State Wetland Rating System for Eastern Washington For other resources and guidance on protecting wetlands, go to Ecology’s Local Wetland Regulations: Growth Management Act technical assistance and see: • Wetland Guidance for Critical Areas Ordinance (CAO) Updates: Western and Eastern Washington (2022) Do the regulations use a rating system to determine wetlands protection? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.220.C MCA 26-0090 Exhibit 11 178November 4, 2026 G - 271 CRITICAL AQUIFER RECHARGE AREAS Policies and regulations protect the functions and values of critical aquifer recharge areas. RCW 36.70A.172(1). Policies and regulations protect the quality and quantity of groundwater used for public water supplies. RCW 36.70A.070(1) and WAC 365-196-485(1)(d). The following references also relate to protection of groundwater resources: • RCW 90.44 – Regulation of Public Groundwaters • RCW 90.48 – Water Pollution Control • RCW 90.54 – Water Resources Act of 1971 • RCW 36.36.020 - Creation of aquifer protection area (1985) • WAC 365-190-100 Critical Aquifer Recharge Areas 2023 • WAC 173-100 Groundwater Management Areas and Programs (1988) • WAC 173-200 Water Quality Standards for Groundwaters of the State of Washington (1990) • WAC 365-196-735 Consideration of state and regional planning provisions (list) (2010) The Critical Aquifer Recharge Areas Guidance Document (2021) provides information on protecting functions and values of critical aquifer recharge areas, best available science, how to work with state and local regulations and adaptive management. Also, consider the following: • Prohibiting or strictly regulating hazardous uses in critical aquifer recharge areas (CARAs) and designating and protecting wellhead areas. See Ecology’s guidance on Critical Aquifer Recharge Areas . • Limiting impervious surfaces to reduce stormwater runoff, as required under Phase I and II municipal stormwater permits. Ecology’s Stormwater Manual for Western Washington (2012) includes low impact development (LID) related definitions, requirements, and an LID performance standard. See Stormwater Management and Design Manuals on Ecology’s web page. • For additional guidance on LID resources, see Commerce’s Incentivizing low- impact development guidebook . If groundwater is used for potable water, do regulations protect the quality and quantity of ground water? ☐ Yes ☐ No ☒ N/A Location in text: COPA does not currently use groundwater for potable water, however, regulation is planned to be set should the City explore the use of groundwater for potable water. Article IV Sections 15.22.280 – 15.22.320. Are the critical aquifer recharge regulations consistent with current mapping of these critical areas? ☐ Yes ☐ No ☒ N/A Location in text: Mapping will be updated over the coming months prior to ordinance adoption. MCA 26-0090 Exhibit 11 179November 4, 2026 G - 272 CRITICAL AQUIFER RECHARGE AREAS FREQUENTLY FLOODED AREAS Regulations protect the functions and values of frequently flooded areas and safeguard the public from hazards to health and safety. RCW 36.70A.172(1). WAC 365-196-830 provides: "’Protection‘ in this context means preservation of the functions and values of the natural environment, or to safeguard the public from hazards to health and safety.” WAC 365-190-110 directs c ounties and cities to consider the following when designating and classifying frequently flooded areas: (a) Effects of flooding on human health and safety, and to public facilities and services; (b) Available documentation including federal, state, and local laws, regulations, and programs, local studies and maps, and federal flood insurance programs, including the provisions for urban growth areas in RCW 36.70A.110; (c) The future flow flood plain, defined as the channel of the stream and that portion of the adjoining flood plain that is necessary to contain and discharge the base flood flow at build out; (d) The potential effects of tsunami, high tides with strong winds, sea level rise, and extreme weather events, including those potentially resulting from global climate change; (e) Greater surface runoff caused by increasing impervious surfaces. Classification of and regulations for frequently flooded areas should not conflict with the FEMA requirements for the National Flood Insurance Program (NFIP). See Ecology’s Frequently Flooded areas: Critical Areas Ordinance webpage and 44 CFR 60. Communities that are located on Puget Sound or the Strait of Juan de Fuca, or have lakes, rivers or streams that directly or indirectly drain to those water bodies, are subject to the NFIP Biological Opinion (BiOp) for Puget Sound. The biological opinion required changes to the implementation of the NFIP in order to meet the requirements of the Endangered Species Act (ESA) in the Puget Sound watershed. FEMA Region X has developed an implementation plan that allows communities to apply the performance standards contained in the Biological Opinion by implementing: Are f requently flooded areas designated and regulated using FEMA and Ecology guidance? ☒ Yes ☐ No ☐ N/A Location in Text: Chapter 15.12 was updated in 2024 (referenced in Article V, sections 15.22.33 0 - 15.22.370) Are you utilizing your CAO as part of a programmatic response to the BiOp? ☒ Yes ☐ No ☐ N/A Location in Text: A rticle V MCA 26-0090 Exhibit 11 180November 4, 2026 G - 273 FREQUENTLY FLOODED AREAS 1) a model ordinance ; 2) a programmatic Checklist; or 3) on a permit by permit basis as long as it can be demonstrated that there is no adverse effect to listed species. Communities have the option of utilizing their CAOs as part of a programmatic response to address the requirements of the biological opinion. FEMA must approve a community’s biological opinion compliance strategy. Additional resources: RCW 86.12 Flood Control by Counties RCW 86.16 Floodplain Management RCW 86.26 State Participation in Flood Control Maintenance RCW 86.16.041 Floodplain Management Ordinance and Amendments WAC 173-158-070 Requirements for construction in Special Flood Hazard Areas DEFINITION OF GEOLOGICALLY HAZARDOUS AREAS The definition of geologically hazardous areas is consistent with RCW 36.70A.030(20) and WAC 365-190-120(1). “Geologically hazardous areas" means areas that because of their susceptibility to erosion, sliding, earthquake, or other geological events, are not suited to the siting of commercial, residential, or industrial development consistent with public health or safety concerns. Is the geologically hazardous areas definition consistent with RCW 36.70A.030(20)? ☒ Yes ☐ No ☐ N/A Location in Text: 15.02.010 - Definitions PROTECTION OF GEOLOGICALLY HAZARDOUS AREAS Regulations protect the functions and values of geologically hazardous areas and safeguard the public from hazards to health and safety. RCW 36.70A.172(1). WAC 365-196-830 provides: “’Protection’" in this context means preservation of the functions and values of the natural environment, or to safeguard the public from hazards to health and safety.” Geologically hazardous areas are designated, and their use is regulated or limited consistent with public health and safety concerns . RCW 36.70A.030(20) WAC 365-190-120 describes the different types of hazardous areas: Are uses in geologically hazardous areas designated and regulated or limited consistent with public health and safety? ☒ Yes ☐ No ☐ N/A MCA 26-0090 Exhibit 11 181November 4, 2026 G - 274 • Geologically hazardous areas include: • Erosion hazards • Landslide hazards • seismic hazards • tsunami hazards • volcanic hazards • channel migration zones • areas subject to other geological events such as coal mine hazards including: mass wasting, debris flows, rock falls, and differential settlement. The Department of Natural Resource’s Washington Geological Survey Geologic Hazards and the Environment website includes information on earthquakes and faults, landslides, volcanoes and lahars, tsunamis, hazardous minerals, emergency preparedness, historic mines and includes geologic hazard maps that can be accessed from the Geologic Information Portal. Location in Text: Sections 15.22.380 – 1.22.430 Additionally, 15.22.070 – 15.22.100 defines exempt, allowed, permitted, and reasonable use exceptions for all critical areas. DEFINITION OF FISH AND WILDLIFE HABITAT AND CONSERVATION AREAS The definition of fish and wildlife habitat conservation areas is consistent with WAC 365-190-030(6). The definition of fish and wildlife habitat conservation areas was amended to state that they do not include: “such artificial features or constructs as irrigation delivery systems, irrigation infrastructure, irrigation canals, or drainage ditches that lie within the boundaries of and are maintained by a port district or an irrigation district or company”. Is the FWHCA definition consistent with WAC 365-190- 030(6 )? ☒ Yes ☐ No ☐ N/A Location in Text: 15.02.010 - Definitions PROTECTION OF FISH AND WILDLIFE HABITAT AND CONSERVATION AREAS Have you reviewed your regulations MCA 26-0090 Exhibit 11 182November 4, 2026 G - 275 Policies and regulations protect the functions and values of fish and wildlife habitat conservation areas. RCW 36.70A.172(1) and WAC 365-190-030(6). WAC 365-190-130(4) says local jurisdictions must consult current information on priority habitats and species identified by WDFW . Additional information that must be consulted is available from DNR’s natural heritage program and aquatic resources program . BAS regarding biodiversity areas and corridors has advanced significantly. Recent updates and resources include: • Aquatic Habitat Guidelines • Priority Habitat and Species maps • Priority Habitats and Species List (updated June 2023) • Priority Habitats and Species: Management recommendations: • Landscape Planning for Washington’s Wildlife (2009) • Land Use Planning for Salmon, Steelhead and Trout (2009) • Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (2020) • Riparian Ecosystems, Volume 2: Management Recommendations (2020) • Riparian Management Zone Checklist for CAOs (2023) • Shrub-Steppe Management Recommendations (2020) • Oregon White Oak Woodlands Ecosystems Management Recommendations (1998) • Management recommendations for Washington's Priority Species (by taxa) • Puget Sound Kelp Conservation and Recovery Plan (2020) • Stream Habitat Restoration Guideline s (2012) • Water Crossing Design Guidelines (2013) “Areas where endangered, threatened, and sensitive species have a primary association” must be considered per WAC 365-190-130(2)(a). Consult WDFW’s Threatened and Endangered Species list and U.S. Fish and Wildlife Service’s Information for Planning and Consultation resources for up to date information on all state and federal listed species. Also see the Puget Sound Pa rtnership’s Salmon Recovery website for Water Resource Inventory Area (WRIA) Plans in Puget Sound. regarding any applicable changes in management recommendations for priority habitats and species? ☒ Yes ☐ No ☐ N/A Location in Text 15.22.470 – 15.22.490 Have you reviewed your regulations regarding any changes in species listings? ☒ Yes ☐ No ☐ N/A Location in Text 15.22.450.A.1 MCA 26-0090 Exhibit 11 183November 4, 2026 G - 276 DESIGNATING AND PROTECTING WATERS OF THE STATE RCW 90.48.020 defines waters of the state, which include all surface waters, salt waters, groundwater and all other water courses in Washington. WAC 365-190- 130(2)(f) recommends designating all waters of the state as fish and wildlife habitat conservation areas (FWHCAs). Stream types are classified in WAC 222-16-030 with field verification, or an alternate system that considers factors listed in WAC 365-190-130(4)(f)(iii). See http://www.dnr.wa.gov/forest-practices -water-typing to use Washington State Department of Natural Resources (DNR)’s stream typing system. Establish riparian management zones to maintain no net loss of riparian ecosystem functions and values. Designate areas that risk contaminating or harming shoreline resources including tidelands and bedland suitable for shellfish harvest, kelp and eelgrass beds and forage fish spawning areas. Do you designate waters of the state as FWHCAs? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.450.A.5 Do your regulations protect waters of the state? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.480 – 15.22.490 ANADROMOUS FISHERIES Policies and regulations for protecting critical areas give special consideration to conservation or protection measures necessary to preserve or enhance anadromous fisheries. RCW 36.70A.172(1) is the requirement and WAC 365-195- 925 lists criteria involved. This requirement applies to all five types of critical areas. WAC 365-190-130(4)(i) recommends sources and methods for protecting fish and wildlife habitat conservation areas, including salmonid habitat. Counties and cities may use information prepared by the United States Department of the Interior Fish and Wildlife Service, National Ma rine Fisheries Service, the Washington State Department of Fish and Wildlife, the State Recreation and Conservation Office, and the Puget Sound Partnership to designate, protect and restore salmonid habitat. Counties and cities should consider recommendations found in the regional and watershed specific salmon recovery plans (see the Governor's Salmon Recovery Office webpage and the Puget Sound Partnership’s Salmon Recovery webpage). Land Use Planning for Salmon, Steelhead and Trout: A land use planner’s guide to salmonid habitat protection and recovery (October 2009) is an excellent resource. Do your regulations give special consideration to anadromous fisheries? ☒ Yes ☐ No ☐ N/A Location in Text: 15.22.010 and 15.22.480 MCA 26-0090 Exhibit 11 184November 4, 2026 G - 277 REASONABLE USE EXCEPTIONS The Critical Areas Ordinance (CAO) allows for “reasonable use” if the CAO would otherwise deny all reasonable use of property. Reasonable use provisions should limit intrusions into critical areas to the greatest extent possible and apply the mitigation sequence as needed for no net loss of ecosystem functions and values RCW 36.70A.370. Common exemptions include emergencies, remodels that do not further extend into critical areas, surveying, walking, and development that has already been completed with critical areas review under a previous permit. See Critical Areas Handbook, Chapter 3: Structuring Critical Areas Regulations, p.10 (Updated 2022). Do you have reasonable use provisions? ☒ Yes ☐ No Location in Text: 15.22.100 AGRICULTURAL ACTIVITIES (COUNTIES ONLY) Non-VSP Counties Critical areas regulations as they specifically apply to agricultural activities in counties or watersheds not participating in the Voluntary Stewardship Program (VSP) have been reviewed, and if needed, revised pursuant to RCW 36.70A.130. RCW 36.70A.710(6) "Agricultural activities" means all agricultural uses and practices as defined in RCW 90.58.065. VSP Counties After watershed work plan approval, VSP counties are encouraged to reference and describe their participation in the program within their critical areas development regulations (WAC 365-196-832). See Critical Areas Handbook, Chapter 5: Protecting Critical Areas in Natural Resource Lands (2022). Did you review your regulations as they apply to agricultural activities ? ☐ Yes ☐ No ☒ N/A Location in Text: MCA 26-0090 Exhibit 11 185November 4, 2026 G - 278 FOREST PRACTICES APPLICATION REGULATIONS If applicable , regulations for forest practices have been adopted: RCW 36.70A.570. RCW 76.09.240, requires many counties over 100,000 in population, and the cities and towns within those counties to adopt regulations for forest practices. These are often included in clearing and grading ordinances. Have you adopted f orest practices regulations? ☐ Yes ☐ No ☒ N/A Location in Text: GOOD IDEAS Non-regulatory measures to protect or enhance functions and values of critical areas may be used to complement regulatory methods. These may include: • public education • stewardship programs • pursuing grant opportunities • water conservation • joint planning with other jurisdictions and non-profit organizations • stream and wetland restoration activities • transfer of development rights Monitoring and adaptive management is encouraged in WAC 365-195-905(6) to improve implementation of your regulations. See Commerce’s Monitoring and Adaptive Management chapter in the Critical Areas Handbook , Chapter 7: Monitoring and Adaptive Management of Critical Areas (2022). Are you using non- regulatory measures to protect critical areas? ☒ Yes ☐ No Location in Text: Wetlands restoration activities are the preferred mitigation method as defined in 15.22.260. Do you have a monitoring and adaptive management program for your CAO? ☒ Yes ☐ No Location in Text: MCA 26-0090 Exhibit 11 186November 4, 2026 G - 279 Mitigation plan requirements include a monitoring program and contingency plan that will require corrective measures if performance standards are not being met. Section 15.22.140.E and F outline these requirements. Also, 15.22.510.B.8 MCA 26-0090 Exhibit 11 187November 4, 2026 G - 280 MCA 26-0090 Exhibit 12 DATE: June 24, 2026 TO: Planning Commission FROM: Planning Division RE: Phase 2 Municipal Development Code Audit – Relevant Resources Frequently Flooded Areas WAC 365-190-110 – Frequently flooded areas (https://apps.leg.wa.gov/WAC/default.aspx?cite=365-190-110) Department of Ecology guidance for floodplains (https://ecology.wa.gov/regulations-permits/guidance-technical-assistance/guidance-for- floodplains-critical-areas-ordinanc) Land Use Planning for Salmon, Steelhead and Trout (https://wdfw.wa.gov/sites/default/files/publications/00033/wdfw00033.pdf) Floodplain Habitat Assessment and Mitigation – Regional Guidance for the Puget Sound Basin (https://www.ecology.wa.gov/getattachment/b2847e38-b79a-4646-8d3a- 78d734f567f5/%EF%BF%BD%C3%BF%3Cfont%20color=) Fish and Wildlife Habitat Conservation Areas WA Department of Fish and Wildlife Riparian Ecosystems, Volume 1: Science Synthesis and Management Implications (https://wdfw.wa.gov/sites/default/files/publications/01987/wdfw01987.pdf) WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA Department of Transportation and WA Department of Fish and Wildlife, Washington Habitat Connectivity Action Plan (https://wdfw.wa.gov/sites/default/files/publications/02630/wdfw02630.pdf) 188November 4, 2026 G - 281 MCA 26-0090 Exhibit 12 WDFW Riparian Management Zone Checklist for Critical Areas Ordinance – Addendum (https://wdfw.wa.gov/sites/default/files/2023-08/rmr-cao-checklistaddendum.pdf) Geologically Hazardous Areas WA Department of Fish and Wildlife Riparian Ecosystems, Volume 2: Management Recommendations (https://wdfw.wa.gov/sites/default/files/publications/01988/wdfw01988.pdf) WA DNR Geologic Information Portal (https://dnr.wa.gov/washington-geological- survey/publications-and-data/geologic-information-portal) Critical Aquifer Recharge Areas Department of Ecology – Critical Aquifer Recharge Areas Guidance (https://apps.ecology.wa.gov/publications/summarypages/0510028.html) WAC 365-190-100 Critical Aquifer Recharge Areas (https://app.leg.wa.gov/wac/default.aspx?cite=365-190-100) Wetlands WA Department of Ecology Wetland Guidance for Critical Areas Ordinance Updates (https://apps.ecology.wa.gov/publications/documents/2206014.pdf) WA Department of Ecology Washington State Wetland Rating System for Western Washington (https://apps.ecology.wa.gov/publications/documents/1406029.pdf) WA Department of Ecology Wetlands in Washington State Vol. 2: Guidance for Protecting and Managing Wetlands, July 2018 Modified Habitat Score Ranges (https://apps.ecology.wa.gov/publications/parts/0506008part3.pdf) WA Department of Ecology Characterizing Wetland Buffers in Washington State (https://apps.ecology.wa.gov/publications/documents/1706008.pdf) Comparable Jurisdictions Anacortes Critical Areas Ordinance Arlington Critical Areas Ordinance Bellingham Critical Areas Ordinance Gig Harbor Critical Areas Ordinance Mill Creek Critical Areas Ordinance 189November 4, 2026 G - 282 MCA 26-0090 Exhibit 12 Oak Harbor Critical Areas Ordinance Port Townsend Critical Areas Ordinance Tumwater Critical Areas Ordinance 190November 4, 2026 G - 283 Attachment 5 1 PLANNING COMMISSION MEETING Port Angeles, Washington September 23, 2026 This meeting was conducted as a hybrid meeting. CALL TO ORDER - REGULAR MEETING Vice Chair Kiedrowski called the regular meeting of the Port Angeles Planning Commission to order at 6:00 p.m. ROLL CALL Planning Commission Vice Chair Kiedrowski; Commissioners: Schorr, Mellema, Vogel, Omega Members Excused Absent: Chair Steiger and Commissioner Vanderlugt Staff Present: Community and Economic Development Director Shannen Cartmel, Planning Supervisor Ben Braudrick, Long Range and Special Projects Administrator Angel Torres, Housing Administrator Jalyn Boado, Natural Resources and Grant Administrator Courtney Bornsworth, Senior Development Services Specialist Pat Bartholick, Building Inspector/Licensing Administrator Chris Jackson, CED Technician II Triston Carlstrom. PUBLIC COMMENT Casey B., Resident, is the owner and operator of NW Tree Service. Spoke about the tree protections on marine bluffs affecting view corridors, with lengthy and unpredictable permitting processes that limit homeowners. The enhanced viewshed permitting is cost-prohibitive for homeowners. How does the City establish when and how to charge homeowners? Emphasized the importance of predictable permitting timelines. John R., Resident, is concerned about the critical areas ordinance map in the agenda packet. Discussed that wetlands are delineated on some maps, but not on the critical areas map. Dan B., Resident, is confused about the intent of tonight's discussion. Asked whether the City will restrict view enhancement and tree trimming. Expressed that the City of Port Angeles is responsible for the bluff's ongoing degradation due to stormwater outfall. Raised drainage and slope-stability concerns about the Brix Marine project. Lynn B., Resident, asked the City to preserve a practical process for careful tree pruning and view maintenance on bluff properties. Supported protecting tree roots and slope stability. Stated the views of the strait affect property value and asked that owners using approved methods be able to maintain them. Kelly J., Resident, spoke as the owner of the Courthouse Condominiums. Described the HOA’s small-scale work with a certified arborist to thin vegetation without clear -cutting or disturbing roots. Supported bluff protection and requested clear guidance that allows responsible owners to maintain vegetation safely. Ruth G., Resident, purchased the property she lives at for the view; the property is assessed as a waterfront view property. Requested consistent guidance and reasonable permit timelines. Expressed concern that unclear rules could lead to unpermitted work. AGENDA ITEMS 1. Action Item: APPROVAL OF MINUTES of the August 26, 2026, Meeting It was moved by Vogel and seconded by Shorr to: Approve the August 26, 2026, meeting minutes. November 4, 2026 G - 284 CITY OF PORT ANGELES PLANNING COMMISSION – September 23, 2026 2 Motion carried 5-5. 2. Action Item: Public Hearing for MCA 26-0090 Critical Areas Ordinance Update. A municipal code amendment to Title 15 to update the Critical Areas Ordinance to comply with state law and the best available science. Public Hearing Public Comment: Casey B, Resident, understands the Environmentally Sensitive Areas Exemptions (ESEs) requirements are similar. The City will not sign off on a permit for property that they own; compares ESEs to R ight of Way permits. There is destruction of public property in the Tumwater Creek corridor. Questioned the consistency and impartiality of City permitting decisions, using other development and drainage reviews as comparisons. Lynn B., Resident, restated her request for a workable way to maintain views through careful, approved pruning. Bryan J., Resident, lives on the bluff. Questioned how the ordinance affects existing homes. Asked how homeowners can address bluff stability before it becomes an emergency? As property owners living on the bluff, they have more at stake. The City should look into cost-saving measures for bluff stability and permitting. Frustration with uncertainty is real, and the process should be easy for professionals to navigate. Requested affordable, repeatable maintenance procedures and standards that qualified local contractors could follow. Renee (Penny) S., Resident, The City needs a common-sense approach to code changes related to view enhancements and bluff stability. Citizens must pay to maintain the bluff. A certified arborist is needed in the current permitting process, and the current system is working. Many of the City's parcels are paid for by the general public. Expressed that the City’s approval should be automatic. Dan B., Resident, asked whether the City would approve view work on City -owned property. Repeated his concerns about drainage and slope stability at the Brix Marine project, including his view that its proposed wall and drainage approach may be inadequate. William D., Resident, supported other bluff residents’ concerns about property values and drainage maintenance. Tony D., Resident, described earlier permission and arborist-assisted work to maintain his view corridor, followed by difficulty obtaining later approvals. Questioned the delays, costs, and effect of changed requirements on his view and property value. Jenessa B., Resident, described an environmentally sensitive area application returned as incomplete while the City assesses management of its urban forest and City -owned property. Said the required City-owner signature makes the process unclear and delays work for local contractors. Shane Park has been closed since June 12 due to hazardous trees. Questioned whether the City plans to take on view enhancement itself. Feels ignored. John R., Resident, Environmental permitting processes have become cumbersome, especially with bluff/sloping property. Spoke about the next steps at City Council. Kelly J., Resident, clear and reasonable vegetation laws are needed. A neighbor illegally clear -cut a bluff property with little to no follow-up from Code Enforcement. There have also been encampments at the bottom of the bluffs and ravine, with no timely action. Stated that the City is making processes harder for rule-abiding citizens. Asked the Commission to consider the experience of longtime residents and contractors. Requested a workable path for owners trying to comply. Commissioner Discussion Commissioner Vogel, asked when the mapping will be done and brought before the Planning Commission? Has concerns over the critical aquifer recharge areas. Manufacturing and industrial uses are not allowed in the critical aquifer recharge areas. Suggests that, in the future, the maps be brought before the Planning Commission beforehand. November 4, 2026 G - 285 CITY OF PORT ANGELES PLANNING COMMISSION – September 23, 2026 3 Commissioner Shorr, flagged “hobby farms” in PAMC 15.22.240 B appearing in two “high” and “moderate” land- use intensity categories and duplicate subsection lettering for correction. There is duplicative lettering in PAMC 15.22.230. Asked about the earlier Commission motion concerning wetland buffer Option 3 and WAC exceptions. Vice Chair Kiedrowski, in PAMC 15.22.080 H, the code regarding vegetation management, “non -destructive pruning of vegetation is allowed, provided the trees are not located within a landslide or erosion control hazard area,” seems contradictory to what is being said tonight. Action Item: It was moved by Kiedrowski and seconded by Shorr to: Recommend exploring a permit and professional-report process that would allow regular bluff vegetation maintenance at a reasonable cost. Motion carried 5-5. Action Item: It was moved by Vogel and seconded by Shorr to: Recommend approval of MCA 26-0090 to the City Council, provided the maps referenced in the ordinance are returned to the Planning Commission for review. Motion carried 5-5. STAFF UPDATES Customer Service Report Senior Development Services Specialist Bartholick gave a brief update on customer service interactions in August 2026. Monthly Type 0/Over the Counter Report Licensing Administrator and Building Inspector Jackson reported that 334 over-the-counter permits have been issued year-to-date. Monthly 5290 Report Licensing Administrator and Building Inspector Jackson gave a brief report on the 5290 permitting timelines for August 2026. Monthly Affordable Housing Report Housing Administrator Boado-Sousa gave a brief update about affordable housing programs. CED awarded $10K in waiver permitting fees in August 2026 and issued eight preliminary MFTE certificates . Monthly Natural Resources Report Natural Resources and Grant Administrator Bornsworth shared that CED is currently processing multiple SEPA applications and one Shoreline Substantial Development permit. Monthly Land Use Permitting and Economic Development Report November 4, 2026 G - 286 CITY OF PORT ANGELES PLANNING COMMISSION – September 23, 2026 4 Long-range and special projects Administrator Torres highlighted the economic development industry summit, which will take place in late January 2027. Monthly Building Report Senior Development Services Specialist Bartholick gave the August 2026 building report, which showed 39 building permits were issued. Growth Management Act Report Planning Supervisor Braudrick shared that the City of Port Angeles is now GMA compliant and can move forward with grant applications. COMMISSION REPORTS No Commission Reports. SECOND PUBLIC COMMENT None received. ADJOURNMENT Vice Chair Kiedrowski adjourned the meeting at 7:48 p.m. _____________________________________ _______________________________ Dallas Kiedrowski, Vice Chair Jalyn Boado, Secretary November 4, 2026 G - 287 1 Date: November 4, 2026 To: City Council From: Calvin W. Goings, Deputy City Manager Shannen Cartmel, CED Manager Ben Braudrick, Planning Supervisor Jalyn Boado, Housing Administrator Subject: Clallam County Homelessness Task Force Recommendations 2.0 Relationship to Strategic Plan: The 2026-2027 Strategic Plan (Resolution 04-26) was approved by the City Council on April 7, 2026. This item aligns with Strategic Focus Area #3B, which includes implementing actions outlined in the 2025 Housing Action Plan (HAP) Periodic Update. Background / Analysis: At the February 3, 2026, meeting, the City Council discussed camping and encampments and directed staff to schedule a work session on April 7, 2026, to further explore the issue. In preparation for the work session, several external organizations presented information regarding their respective roles in providing homelessness services. During the April 7, 2026, work session, City staff summarized these presentations, outlined existing City partnerships and programs supporting housing and homelessness services, and facilitated Council discussion regarding potential actions to address camping, encampments, and homelessness. The discussion continued during the April 7, 2026, regular City Council meeting, where Council approved several motions directing additional staff research and follow-up. One motion specifically directed staff to: “Direct staff to report back to Council, no later than the second meeting in September, the feasibility of the creation of a Memorandum of Understanding or Interlocal Agreement with Clallam County that Summary: At the April 7, 2026, City Council meeting, Council directed staff to explore opportunities to strengthen the City's role in decisions regarding federal and state homelessness funding administered through Clallam County. After additional Council discussion on September 15, 2026, City staff met with Clallam County representatives on October 19, 2026, to identify opportunities to increase City participation and oversight within the existing Homelessness Task Force (HTF) structure. As a result of these discussions, staff are recommending City Council appointments to two upcoming HTF subcommittees, continued coordination between City and County leadership, and quarterly funding updates to City Council to improve transparency, collaboration, and the City's involvement in homelessness funding decisions. Strategic Plan: This item aligns with Strategic Focus Area #3 – Housing. Funding: N/A Recommendation: 1) Approve recommendations #1-4 and direct City staff to implement the recommendations as detailed in this memo. November 4, 2026 I - 1 2 establishes some form of a new oversight board or a larger stake as a member of a leadership team subset of an existing county board, committee, or commission where the City has a stronger voice in the final say on the uses of federal and state homelessness funding, such as 1590 sales tax and document recording fees, that are directed to be used within City limits.” Staff returned to Council on September 15, 2026, with an analysis of available options and recommendations (Attachment 1). During that meeting, Council considered a motion to approve Option A, which would strengthen City participation within the existing Homelessness Task Force (HTF) structure, while seeking improved access to funding information, participation in establishing performance measures, and greater involvement in evaluating program outcomes. Councilmember Hodgson is the current City representative to the HTF, and Councilmember Miller is the City’s alternate. Council ultimately tabled that motion and instead directed staff to coordinate additional discussions with Clallam County and designated Council members Hodgson, Miller and Hamilton as the Council liaisons on this matter. As a result of that direction, City staff had an initial meeting at the staff level on October 19, 2026 to discuss next steps. Attendees from the County included Clallam County Health and Human Services Deputy Director Jenny Oppelt and Behavioral Health and Homelessness Coordinator Christine Dunn. Thisdiscussion included opportunities to increase City participation, transparency, and collaboration in homelessness funding decisions. Based on this discussion, staff recommends the following actions to strengthen the City's involvement in the existing HTF process. 1. Enhanced Participation in HTF Funding Priorities Subcommittee Appoint Councilmember Hodgson and/or Councilmember Miller to participate in the HTF Funding Priorities Subcommittee. The subcommittee is scheduled to meet on Monday, November 16, 2026, from 2:00 to 4:00 p.m., with a potential follow-up meeting. The subcommittee will assist in developing funding priorities and Request for Proposals (RFP) scoring criteria consistent with the five-year Homeless Housing Plan. Participation at this stage will provide the City with a direct opportunity to contribute to the development of funding priorities and evaluation criteria before proposals are solicited and reviewed. 2. Active Involvement in HTF RFP Review Subcommittee Councilmember Hodgson and/or Councilmember Miller seek appointment to the HTF RFP Review Subcommittee. Interested Council members would attend the December 1, 2026, regular HTF meeting and nominate themselves for participation. The RFP Review Subcommittee is anticipated to meet during the week of March 22–26, 2027, to evaluate approximately 10 funding proposals. Participation would provide the City with a direct role in reviewing proposed projects, assessing their alignment with established priorities, and contributing to funding recommendations. November 4, 2026 I - 2 3 Clallam County staff have indicated that each subcommittee may include up to two City Council representatives, with a preference for participation by Councilmember Hodgson, the City's current HTF representative, and/or Councilmember Miller, the designated alternate. 3. Expanded City and County Coordination Request the City Clerk to coordinate a follow-up meeting upon the completion of the HTF RFP review cycle. The meeting would include the City Manager, County Administrator or designated County management representative, Councilmembers Hamilton, Hodgson, and Miller, and Commissioner Johnson. This meeting would provide an opportunity to evaluate the City's participation in the funding process, discuss outcomes, identify opportunities for improvement, and determine whether to consider additional agreements or changes to the existing structure. 4. New Quarterly Homelessness Funding Updates Clallam County Health and Human Services Deputy Director Jenny Oppelt has offered to provide quarterly presentations to the City Council regarding homelessness-related funding and expenditures. These updates would include information regarding document recording fee revenues and expenditures associated with SHB 2060 (RCW 36.22.178) and HB 2163 (RCW 36.22.179), as well as the one-tenth of one percent sales and use tax authorized under RCW 82.14.460 for behavioral health services. Request the Clerk invite Clallam County Health and Human Services to provide these quarterly updates to improve transparency, strengthen intergovernmental coordination, and provide Council with ongoing information regarding funding allocations, program investments, and outcomes. Funding Overview: There is no funding associated with the HTF subcommittee appointments. The HTF RFP review subcommittee will recommend funding allocations for SHB 2060 (RCW 36.22.178) and HB 2163 (RCW 36.22.179). Attachments: 1. Clallam County Homelessness Task Force Overview and Recommendations memo 2. HTF Draft RFP Timeline November 4, 2026 I - 3 1 Date: September 15, 2026 To: City Council From: Calvin W. Goings, Deputy City Manager Nathan A. West, City Manager Shannen Cartmel, CED Manager Ben Braudrick, Planning Supervisor Jalyn Boado, Housing Administrator Subject: Clallam County Homelessness Task Force Overview and Recommendations Relationship to Strategic Plan: The 2026-2027 Strategic Plan (Resolution 04-26) was approved by the City Council on April 7, 2026. This item aligns with Strategic Focus Area #3B, which involves implementing actions outlined in the 2025 Housing Action Plan (HAP) Periodic Update. Specifically, the HAP focuses on developing strategies to improve housing affordability and minimize displacement. Background / Analysis: At the February 3, 2026, City Council meeting, camping and encampments were discussed. A motion was passed to hold a City Council Work Session on this issue on April 7, 2026. This item was originally presented to Council on May 19th 2026, however, consideration was postponed to a future meeting. Organizational Presentations To prepare for the work session, a series of external organizations presented to the City Council on their respective roles in homelessness services. During Council meetings in February and March, the City Council received presentations from the following organizations; Habitat for Humanity, Salvation Army, 4PA, the Clallam County Homelessness Task Force, Clallam County Harm Reduction Center, Peninsula Behavioral Health, Peninsula Housing Authority, Serenity House, The Answer For Youth (TAFY), Port Angeles Waterfront District, Olympic Peninsula Community Clinic (OPCC) / REdisCOVERY, Port Angeles First United Methodist Church, and Olympic Community Action Programs. April 7th Work Session Summary: At the April 7, 2026, City Council meeting, the following motion was passed: “Direct staff to report back to Council, no later than the second meeting in September, the feasibility of the creation of a Memorandum of Understanding or Interlocal Agreement with Clallam County that establishes some form of a new oversight board or a larger stake as a member of a leadership team subset of an existing county board, committee, or commission where the City has a stronger voice in the final say on the uses of federal and state homelessness funding, such as 1590 sales tax and document recordin g fees, that are directed to be used within City limits.” This memo describes Clallam County's Homelessness Task Force, the models used by other cities and counties to address homelessness, and offers options for enhanced co- governance. Strategic Plan: This item aligns with Strategic Focus Area #3 – Housing. Funding: N/A Recommendation: 1) Select Option A or B, and 2) authorize the Mayor to write a letter to the Chair and Vice Chair of the Homelessness Task Force to discuss the preferred option. Attachment 1 November 4, 2026 I - 4 2 During the April 7th Work Session, City staff provided a review of the presentations and recommendations from external organizations; the roles and partnerships that City departments have in supporting housing and homelessness assistance programs; and posed a series of questions to City Council to facilitate discussion on addressing camping, encampments, and homelessness. April 7th City Council Meeting The discussion carried over to the regular meeting on April 7, 2026, where Council took formal action. Motions were passed to prepare a set of proposals on several topics, including the following: “Direct staff to report back to Council, no later than the second meeting in September, the feasibility of the creation of a Memorandum of Understanding or Interlocal Agreement with Clallam County that establishes some form of a new oversight board or a larger stake as a member of a leadership team subset of an existing county board, committee, or commission where the City has a stronger voice in the final say on the uses of federal and state homelessness funding, such as 1590 sales tax and document recording fees, that are directed to be used within City limits.” Staff prepared this memo and background information to assist the City Council in considering the next steps. Federal and State Laws that control Homelessness Funding There are several state laws addressing homelessness funding: •RCW 43.185C.050 requires every Washington county with a homeless housing task force to create a multiyear plan aimed at eliminating homelessness, and it defines what activities those plans may fund. •RCW 43.185C.060 creates a Washington State Home Security competitive grant fund that is managed by the Washington State Department of Commerce and primarily funded through recording fees. This statute creates performance metrics for the Counties and ties a portion of the funding to measurable outcomes. This fund is primarily available to Washington State Counties. •RCW 36.32.120 (6) gives Counties the legislative authority to control County property and the management of the County funds. •RCW 43.185C.080 defines the eligible organizations for homelessness funds, including nonprofits, local governments, and housing authorities. In addition, the following is stated: “Only a local government is eligible to receive a homeless housing grant from the home security fund account. Any city may assert responsibility for homeless housing within its borders, if it so chooses, by forwarding a resolution to the county legislative authority stating its intention and commitment to operate a separate homeless housing program. The city shall then receive a percentage of the surcharge assessed under RCW 36.22.250(2)(b) equal to the percentage of the city's local portion of the real estate excise tax collected by the county. A participating city may also then apply separately for homeless housing program grants.” •Homelessness Emergency Assistance and Rapid Transition to Housing (HERTH) Act consolidated HUD’s competitive grant programs into a single Continuum of Care (CoC) program, emphasizing rapid re-housing, widened the definition of homelessness, and increased prevention resources to improve efficiency. Attachment 1 November 4, 2026 I - 5 3 Washington State and the counties, in large part, control homelessness funding, homelessness task forces, and create local homelessness housing plans. It is the responsibility of the Cities to actively participate in these processes and groups. County Funding Opportunities and the Relation to Sales Use Taxes The City of Port Angeles can request 2163 or 2060 funds through a County-led request for proposals process or create a separate homelessness housing program. Staff strongly advises against creating a City- led homelessness housing program without additional dedicated recurring funding and staffing. Both the City of Port Angeles and Clallam County manage separate Sales and Use Tax SHB 1406 (through RCW 82.14.540), and Sales and Use Tax SHB 1590 funds (through RCW 82.14.530). Since 2024, the City of Port Angeles has awarded a $40,000 SUT 1406 grant to Peninsula Behavioral Health to rehabilitate a single-family residence for its program participants. There have been five SUT 1590 grants awarded by the City since 2024. A $24,999 grant was awarded to TAFY and the First United Methodist Church of Port Angeles to build one transitional-housing tiny home. A $740,000 SUT 1590 grant was given to PBH for the North View 36-unit permanent supportive housing development. In 2025, a $50,000 grant was awarded to support 4PA's 11-unit transitional- housing tiny homes. In 2026, a $9,000 1590 SUT grant was awarded to the Olympic Home Share organization to support the Nesterly home-sharing app. In 2026, a $91,006.37 grant was awarded to 4PA for the common facilities building, which includes three bathrooms, a kitchen, and common areas. The City of Port Angeles manages a highly successful SUT affordable housing grant program; therefore, it is not recommended that the Clallam County Homelessness Task Force or Housing Solutions Committee have jurisdiction over the distribution of these City funds. Clallam County Homelessness Task Force The Clallam County Homelessness Task Force (HTF) was created in 2005 through Resolution 85 and serves as an advisory committee to the Board of County Commissioners. The HTF advises and recommends on issues related to the 10- Year Plan to End Homelessness in Clallam County. On May 27, 2025, the HTF updated the five-year plan for Clallam County's response to homelessness. HTF has a maximum of 22 positions, with 17 current members serving three terms with no term limits. HTF includes an executive committee, on which the City of Port Angeles has a seat; a request for proposals (RFP) review committee composed of HTF members and community members with no fiduciary association with the Homeless Grant, consisting of 2163 and 2060 funds; and an outreach and education committee. The Executive Committee is comprised of no more than seven members: • Chair: Viola Ware, Director of Housing and Community Development, Olympic Community Action Programs • Vice Chair: Sharon Maggard, the Executive Director of Serenity House of Clallam County • Additional members whose agencies work directly with the homeless and those who are Government Officials. The most recent HTF RFP Review Committee was comprised of: • Amy Miller, City of Port Angeles City Council Member • Loni Greninger, Vice Chairwoman of the Jamestown S’Klallam Tribe • Laurel Shriner, United Way of Clallam County Community Impact Manager • John DeBoer, a homeless or formerly homeless representative Attachment 1 November 4, 2026 I - 6 4 The RFP review process was facilitated by Jenny Oppelt, Clallam County Health and Human Services Deputy Director, and Christine Dunn, the Clallam County Health and Human Services Behavioral Health and Homelessness Coordinator. The HTF primarily recommends funding allocations for SHB 2060 (RCW 36.22.178), which provides funds for the operation and maintenance of low- income housing projects and for innovative housing demonstration projects, and HB 2163 (RCW 36.22.179), which provides funds to address local homelessness by providing housing, supportive services, and homelessness prevention. Clallam County has access to the Washington State Department of Commerce Consolidated Homeless Grant funding and document recording fees, also known as the Washington State Home Security Fund, through SSB 5386 and RCW 36.22.250. These funds are not awarded through the RFP process. Clallam County Homelessness Task Force Funding Process The HTF uses a Request for Proposals (RFP) process to make funding decisions for eligible projects on a fixed biennial schedule that aligns with the Washington State fiscal year. The most recent 2025-2027 funding allocation approved 11 applications totaling $1,148,281.95 for shelter/housing, security mitigation, housing navigators, and workforce development. Awards totaling $755,778.65, or 66% of the total funding, went directly to organizations working primarily within the Port Angeles city limits. Homelessness funding proposals are reviewed by the RFP committee, approved at the HTF level, and ultimately approved by the Clallam County Board of County Commissioners. Sales and Use Tax SHB 1406 (through RCW 82.14.540), and Sales and Use Tax SHB 1590 funds (through RCW 82.14.530) collected by Clallam County are presented to the County’s Housing Solutions Committee ad hoc RFP committee, then presented to the larger Housing Solutions Committee, and ultimately approved by the Clallam County Board of County Commissioners. Sales and Use Tax 1406 and 1590 funding requests are issued on a rolling basis at the Clallam County Housing Solutions Committee. The Clallam County Housing Solutions Committee is currently reevaluating how to allocate grant funds and at what cadence. Other Examples of ILAs and MOUs for Joint Governance of Homelessness Services Funding Both MOU’s and ILAs are valuable tools that help local governments ensure the rate of return and equity in homelessness funding. Several Washington cities and counties’ MOUs and ILAs regarding homelessness assistance funding and services are provided below: City of Spokane, City of Spokane Valley, and Spokane County The City of Spokane, Spokane County, the City of Spokane Valley, and the Spokane County Housing and Community Development Department have an interlocal agreement stating that each party will administer its grants separately. Data is collected through the Spokane Regional Continuum of Care. The interlocal agreement outlines the joint responsibilities of the fund administrators, including meeting regularly, coordinating planning and community outreach, updating and approving local homelessness plans, updating the housing inventory count, coordinating inclement weather response, jointly planning and conducting the point-in-time count, coordinating and distributing homelessness funds, and evaluating the effectiveness of homelessness programs. City of Seattle and King County The City of Seattle and King County have a memorandum of understanding (MOU) for joint governance of homelessness services. The MOU's key features include rethinking how homelessness services and housing investments are governed by first examining the current system to identify gaps, overlaps, and inefficiencies between county and city efforts. It aims to define clear principles and outcomes and to engage stakeholders to improve services. The process emphasizes regional coordination with cities across Attachment 1 November 4, 2026 I - 7 5 King County to ensure that investments form a cohesive network. The MOU also directs the jurisdictions to study governance models from other U.S. cities for local adoption. City of Vancouver and Clark County Clark County and the City of Vancouver have an ILA specific to sales and use tax for chemical dependency and mental health treatment funds. This ILA supports the City of Vancouver’s owned-and- operated shelter. It also says that Clark County agrees to pay the City of Vancouver $2.1 million for this project. City of Port Townsend and Jefferson County Jefferson County and the City of Port Townsend also have an ILA to create a joint housing fund board. This joint framework speaks to how the two jurisdictions coordinate, manage, and distribute affordable housing recording fees (through RCW 36.22.178 and RCW 36.22.179 & 1791), Sales and Use Tax SHB 1406 funding (through RCW 82.14.540), and Sales and Use Tax SHB 1590 funds (through RCW 82.14.530). All funding for the joint housing fund board is held by the Jefferson County Treasurer, except for 1406 funds, which are managed by the City of Port Townsend. The joint housing fund board has seven members: two city-elected officials, two county-elected officials, and three jointly appointed citizen members. The board recommends how ILA revenues are allocated, creates a 10‑year plan for SHB 1590 funds, establishes RFP processes and scoring criteria, ensures equitable distribution of funds across the county, and confirms all expenditures comply with state law. The ILA also states that the joint housing fund board can jointly hire a facilitator to work through the process. If any disagreements arise, the ILA points to negotiations, non-binding mediation through the Peninsula Dispute Resolution Center, or binding arbitration before a three-person panel. Options for Co-Governance of Homelessness Funding with Clallam County With best practices in mind, City staff are suggesting two options for Council discussion and consideration to fulfill the motion passed at the April 7th City Council Meeting on this topic. An ILA or MOU may be helpful for asserting greater influence by the City of Port Angeles over the funds distribution process, including SHB 2060 (RCW 36.22.178), HB 2163 (RCW 36.22.179), the Washington State Department of Commerce Consolidated Homeless Grant funding, and document recording fees, also known as the Washington State Home Security Fund, through SSB 5386 and RCW 36.22.250. City staff advise against co-governance of City SUT 1406 and 1590 funds. Option A – The current HTF charter includes both an executive committee and an RFP selection committee. Although the executive committee is not meeting at present, a new MOU or ILA could revive it, establish regular meetings, and detail specific roles and responsibilities. For Option A, the following steps would be taken: 1) Authorize the Mayor to send a letter to the HTF Chair and Vice Chair, requesting an MOU or ILA to reestablish the executive committee. The executive committee would have specific roles and responsibilities, including greater authority to create the local homelessness plan, set overarching goals, and evaluate and audit the effectiveness of overall homelessness programs and funding streams. 2) The MOU or ILA would also create additional seats on the overall Homelessness Task Force and the executive committee for the City of Port Angeles. This action is both representative of the level of service in Port Angeles and representative of the proportion of homeless community members within Port Angeles city limits. Attachment 1 November 4, 2026 I - 8 6 Option B – Create a joint housing funding board modeled after the Jefferson County Model. Option B could be more costly and time-consuming. Option B recommends an ILA that outlines the following: 1) Authorize the Mayor to send a letter to the HTF Chair and Vice Chair requesting the creation of a joint housing fund board between the City of Port Angeles, the City of Sequim, the City of Forks, the Jamestown S’Klallam Tribe, the Lower Elwha Klallam Tribe, the Quileute Tribe, the Makah Tribe, and Clallam County. 2) The joint housing funding board would coordinate, manage, and distribute homelessness funding. 3) Each jurisdiction could jointly hire an independent and impartial facilitator to guide funding decisions and negotiations. 4) The ILA will task the HTF executive committee with evaluating and auditing the effectiveness of homelessness programs and funding streams. Funding Overview: There is no funding associated with the creation of an interlocal agreement. The proposed City of Port Angeles and Clallam County ILA would discuss the co-governance of SHB 2060 (RCW 36.22.178), HB 2163 (RCW 36.22.179), the Washington State Department of Commerce Consolidated Homeless Grant funding, and document recording fees, also known as the Washington State Home Security Fund, through SSB 5386 and RCW 36.22.250. Attachment(s): 1. Clallam County Homelessness Task Force Bylaws 2. 2025-2027 Clallam County Homelessness Task Force Funding Distribution 3. Spokane Interlocal Agreement 4. King County and Seattle Memorandum of Understanding 5. Clark County and Vancouver Interlocal Agreement 6. Jefferson County and Port Townsend Interlocal Agreement Attachment 1 November 4, 2026 I - 9 DRAFT REQUEST FOR PROPOSAL (RFP) TIMELINE Clallam County Homelessness Program Funding Date Activity December 1, 2026 Homelessness Task Force Meeting – Priorities Confirmed January 4, 2027 RFP presented to BOCC at work session meeting January 12, 2027 RFP approved by BOCC at regular agenda meeting January 12, 2027 RFP released January 25, 2027 Voluntary Bidders Conference questions due to christine.dunn@clallamcountywa.gov by 5pm January 29, 2027 Voluntary Bidders Conference answers posted to HHS website (http://www.clallamcountywa.gov/HHS) March 1, 2027 Proposals due to Board of Commissioners by 3:00 p.m. March 2, 2027 Proposals opened and accepted at BOCC meeting March 22 – 26, 2027 MANDATORY virtual interviews with RFP Review Committee. Rating sheets completed/finalized. Preliminary recommendations made April 6, 2027 Homelessness Task Force Meeting Recommended Proposals on Agenda for Approval April 12, 2027 Work Session with BOCC for funding recommendations April 14 – May 24, 2027 Contracts to County Prosecutor for approval if required June 1, 2027 Contracts to Providers and returned to HHS with signatures June 16, 2027 BOCC regular meeting for contract final approval July 1, 2027 Contract period begins Note – All dates are subject to change – Updated May 6, 2026 Attachment 2 1November 4, 2026 I - 10 Date: November 4, 2026 To: City Council From: Nathan A. West, City Manager Subject: Port Angeles Healthy Youth Coalition Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #1, specifically Goal C, Increase community engagement outreach with the public and local businesses. Background / Analysis: Not only do members of the Port Angeles City Council dedicate time to their duties as Council members, they are also asked to serve on a variety of internal and external boards, committees, and commissions. Appointments to these boards, committees and commissions are typically for two years. List Traditionally, Council has considered the appointment list every two years during their meetings in January. Prior to appointments, staff recommend that Council review the list of assignments in preparation for the January meeting when assignments are made. At that time, staff remind Council they may also choose to add or remove assignments altogether. The current list of Council assignments is as follows: • Clallam County Board of Health • Clallam Transit System Board • Feiro Marine Life Center Board • Fireman's Pension Board • G.M. Lauridsen Charity Trust Summary: City Council members are asked to serve on a variety of internal and external boards, committees, and commissions. Some assignments are either required by State statute or by the organization’s bylaws. Every two years, City Council reviews the current assignments for possible alteration or updates. The Mayor works with Council members to determine each member’s interest in and availability to serve on these various committees and then presents a draft assignment list to the full Council for consideration. Strategic Plan: This proposal directly aligns with Strategic Focus Area #1, specifically Goal C, Increase community engagement outreach with the public and local businesses. Funding: N/A Recommendation: 1) Appoint a Council representative to the Port Angeles Healthy Youth Coalition, and/or 2) discuss the addition during the next upcoming designation of Council assignments currently planned for January of 2028. November 4, 2026 I - 11 • Homelessness Task Force • Joint Task Force – PUD • Law and Justice Council • LEOFF I Disability Board • Lodging Tax Advisory Committee • Marine Resources Committee • North Olympic Peninsula Recompete Coalition • North Olympic Peninsula Resource Conservation & Development Council • Olympic Peninsula Tourism Commission • Peninsula Regional Transportation Planning Organization • Port Angeles Regional Chamber of Commerce • Regional Fire and EMS Delivery • Solid Waste Advisory Committee • Strait Ecosystem Recovery Network • Volunteer Fireman's Pension Board • Utility Advisory Committee • William Shore Memorial Pool District In addition to serving as the primary member, Council members are also assigned to serve as alternates for these committees. While alternates typically do not need to attend regular committee meetings, they do serve an important role in ensuring that the City is represented when the assigned Council member(s) cannot attend. In addition to the list above, throughout the year, Council may be appointed to serve on various sub- committees. Port Angeles Healthy Youth Coalition During the October 6, 2026 a presentation was provided by Amanda Sanders of the Port Angeles Healthy Youth Coalition. Later that evening, Council member Miller suggested the need to discuss a Council representative for the Coalition. Mayor Dexter concurred it should come back to Council for consideration. The Coalition’s meeting is the third Thursday of the month at 3:30 p.m. in person or via Zoom and is a 45-minute meeting. There is not a designated term length so the term would coincide with the standard Council two-year assignments. Reporting The Council Reports section of the meeting agenda is intended to be a time when Council members can update the full body on the work of their various committee assignments. Funding Overview: N/A November 4, 2026 I - 12 Date: November 4, 2026 To: City Council From: Nathan A. West, City Manager Subject: 2027 Legislative Priorities Discussion Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #4, specifically Goal C, Improve public safety and peace of mind in our community while promoting policies that create efficient practices, Measure #3, Reduce unfunded mandates/barriers for state funding through annual adoption of legislative priorities. Background / Analysis: Each year, the City Council establishes legislative priorities that are utilized to inform State and Federal legislators of issues important to the City. Some important items that staff recommend prioritizing this year include: •Adequate and Non Regressive Tax Structure •Ediz Hook Boat Launch •Rayonier Mill Cleanup •Protection of the Department of Natural Resources Elwha Watershed Study Legislation •PILT Funds •Arterial Pavement Procurement and Management •Criminal Justice Costs •Lobbying in partnership with Clallam County for the State to pay their fair share for jail •Regulation of KratomStaff may have additional items to present at the Council meeting. The Association of Washington Cities (AWC) has provided four priorities for this legislative session: Summary: Each year in anticipation of the upcoming State Legislative Session, City Council and staff review and update the City’s Legislative Priorities. Staff are presenting a preliminary list of items to be discussed in preparation for a final list for the 2027 Session. Strategic Plan: This proposal directly aligns with Strategic Focus Area #4. Funding: N/A Recommendation: Discuss 2026 Legislative Priorities and identify items important to the majority of Council. November 4, 2026 I - 13 • Fully fund an ongoing local government fiscal health account • Expand existing city revenue tools • Escalate funding for the Municipal Criminal Justice Assistance Account • Engage state and local government experts • Continue direct and meaningful investments in local infrastructure • Increase funding and enhance eligibility for the Connecting Housing to Infrastructure Program (CHIP) Staff further recommends that the City adopt AWC priorities as part of the 2026 Legislative Briefing Paper. Funding Overview: N/A Attachment: Association of Washington Cities 2027 Legislative Priorities November 4, 2026 I - 14 2027 Candice Bock Government Relations Director candiceb@awcnet.org Contact: Association of Washington Cities • 1076 Franklin St SE, Olympia, WA 98501 • 1.800.562.8981 • wacities.org Cities and towns are home to 66% of Washington’s residents, drive the state’s economy, and provide the most accessible form of government. Their success depends on having adequate resources and being empowered to meet the unique needs of their communities. However, local leaders are struggling with systemic budget challenges that limit their ability to serve their residents. Cities and towns are asking the Legislature to provide tools and support to improve fiscal sustainability and ensure long-term success. Additionally, local leaders and legislators must work together to bolster our economy by funding local infrastructure that improves affordability, supports housing, and creates jobs. City Legislative Priorities Copyright © 2026 by Association of Washington Cities, Inc. All rights reserved. | 09/22/26 Washington’s cities and towns ask the Legislature to partner with us and act on the following priorities: Budget & fiscal sustainability Fully fund an ongoing local government fiscal health account as proposed in SB 6346 (tax on millionaires). The account should backfill lost local revenue from sales tax exemptions and reflect a commitment to share revenue generated in cities and towns with those communities. Expand existing city revenue tools to better meet the funding needs of our communities. Greater flexibility and increased options are needed to meet current budget challenges. This includes revising the outdated property tax cap. Escalate funding for the Municipal Criminal Justice Assistance Account (MCJAA). A modest annual increase of $5 million will better meet local public safety needs and assist with rising costs for indigent defense. Engage state and local government experts to examine and develop recommendations for a long-term update to Washington’s local tax structure to improve fiscal sustainability and move to a more progressive set of revenue options. Housing, jobs, & infrastructure Continue direct and meaningful investments in local infrastructure, including funding for operations and maintenance of aging systems. This includes reliable, full funding for the Public Works Assistance Account with authorization of $500 million for competitive awards for the 2027-29 biennium and no new diversions. Increase funding and enhance eligibility for the Connecting Housing to Infrastructure Program (CHIP). CHIP is a capital budget program that provides state funding to cities to cover certain infrastructure costs for developers of affordable housing. The previous funding level was $100 million; cities are requesting that the state invest $150 million for the next biennium and allow expansion of eligible uses to include impact fees, frontage improvements, sidewalks, and ADA improvements. November 4, 2026 I - 15 1 Date: November 4, 2026 To: City Council From: Nathan A. West, City Manager Subject: Association of Washington Cities Center for 2027 Quality Communities Scholarship Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #1, Increase community engagement outreach with the public and local businesses. Background / Analysis: The AWC Center for Quality Communities (CQC) scholarship supports high school seniors who are active in leadership in their city government, community, or school, and plan to pursue post-secondary education. Each year, all of Washington’s 281 cities and towns can recruit scholarship applicants. Each jurisdiction can nominate one graduating high school senior. In 2025, CQC awarded three scholarships. This year, the CQC will award up to four $3,000 scholarships. The application period opened October 2026 and the deadline for cities to submit their nominations is January 25, 2027. Should Council wish to pursue this, Council should consider a process and timeline to collect, review and nominate a student. During the application process, staff will advertise on the City’s website and social media. Such a timeline could include the following: • November 4, 2026, Council appoints a subcommittee to review and nominate a student. • November 5, 2026, staff will prepare social media and website advertisements. Staff will then begin collecting applications, forwarding the applications to the subcommittee as they come in. • On or around a week before the decided application deadline, staff will close the application period and forward any final applications received to the subcommittee. • On or around a week before the CQC application deadline, staff will close the application period and a member of the subcommittee will forward their nominee to the City Clerk. Summary: The 2027 Association of Washington Cities (AWC) Center for Quality Communities scholarship cycle is now open. The AWC Center for Quality Communities (CQC) scholarship supports high school seniors who are active in leadership in their city government, community, or school and plan to pursue post-secondary education. Strategic Plan: This proposal directly aligns with Strategic Focus Area #1, Increase community engagement outreach with the public and local businesses. Funding: N/A Recommendation: Discuss the staff-recommended application process and appoint a Council subcommittee of no more than three Council members to review scholarship applications and nominate a student to the AWC Center for Quality Communities Scholarship. November 4, 2026 I - 16 2 •Prior to the January 25, 2027 deadline, the City Clerk will submit the subcommittee’s nomination to CQC along with the student’s letter of recommendation. •Following the nomination, staff will communicate to those who were not chosen, and the name of the student nominee will be provided to Council under the Information section of a February City Council meeting packet. Funding Overview: N/A Attachment: None. November 4, 2026 I - 17 Date: November 4, 2026 To: City Council From: Scott Curtin, Director of Public Works & Utilities Subject: Vehicle Purchase – Replacement of Parks Department Vehicle #5335 Relationship to Strategic Plan: The 2025-2026 Strategic Plan (Resolution 10-24) was approved by the City Council on October 1, 2024. This proposal directly aligns with Strategic Focus Area #4 – Infrastructure Development, Maintenance, and Connectivity. Background / Analysis: The Parks Department vehicle #5335 is 20 years old with over 86,217 miles of operation, has accrued $34,091.79 in repairs and maintenance, and has a current fuel economy of 7.4mpg. To maintain operational effectiveness, it is necessary to replace this piece of equipment at this time as it is now beyond its fiscally responsible service life. It will be replaced by a 2027 Ford F550 4x4 2yd dump truck with a 6.7L V8 diesel engine that will utilize R99 renewable diesel, a recognized green fuel. Currently, hybrid or electric models of this vehicle are unavailable. This purchase furthers Equipment Services efforts to consolidate and streamline the fleet, while following Green Fleet requirements. Funding Overview: The vehicle replacement is identified in the 2026 budget (501-7630-594-6410) and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $110,600.00, including taxes and accessories. Summary: Staff is seeking City Council approval for the procurement of a 2027 Ford F550 4x4 2yd dump truck for the replacement of the Parks Department vehicle #5335 in the amount of $110,600.00, including taxes and accessories. Vehicle #5335 is a 2005 Ford F450 2yd dump truck and is recommended for replacement in 2026 to maintain the department’s operational effectiveness. Through the City’s membership in the Washington State Purchasing Cooperative, participating vendor Bud Clary Ford of Longview, WA, was selected from the cooperative vendors list, Contract No. 28423. Strategic Plan: This proposal directly aligns with Strategic Focus Area#4 – Infrastructure Development, Maintenance, and Connectivity. Funding: The vehicle replacement is identified in the 2026 budget (501-7630-594-6410) and through the approved 2027-2032 Equipment Services Capital Facilities Plan, in the amount of $110,600.00, including taxes and accessories. Recommendation: 1) Approve the purchase of a new Parks Department 2027 Ford F550 4x4 2yd dump truck that is the functional equivalent of existing vehicle #5330, in an amount not to exceed $110,600.00 including taxes and accessories, and 2) authorize the City Manager to approve and execute the final purchase documents, to complete the purchase, and to make minor modifications as necessary, and 3) authorize the City Manager to surplus vehicle #5335 and to dispose of the vehicle in a commercially reasonable manner, upon addition of the new vehicle to the City fleet. November 4, 2026 J - 1 Pricing from the Washington State Purchasing Cooperative contract is summarized below: Attachment(s): None Photo Provided for reference. New Vehicle Type Vehicle Budget WSPC Bid Accessories Replacing Vehicle 2027 Ford F550 4x4 Dump Truck $110,600.00 $106,070.71 $4,529.29 #5335, 2006 Ford F450 2yd Dump Truck Total Cost $110,600.00 November 4, 2026 J - 2