HomeMy WebLinkAbout721 E Front St - Building
~ VORT ~Q
,~ ~~lI~:r""
c~~
1L ~
~
~--;;--~
CITY OF PORT ANGELES
DEP ARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number
Property Address .
ASSESSOR PARCEL NUMBER:
Application description
Property Zoning . . .
Application valuation
03-00000069
1021 E 2ND ST
0630006290100000
ELECTRICAL ONLY
Date 2/28/03
o
Owner
Contractor
HAGUEWOOD JAMES T
705 CHRISTMAN PL
PORT ANGELES
WA 983624926
SHAMP ELECTRICAL CONTRACTING
PO BOX 383
PORT ANGELES WA 98362
(360) 452-1689
Permit
Additional desc
Sub Contractor
Permit Fee
Issue Date
Expiration Date
ELECTRICAL NEW COMMERICAL
HI TECH ELECTRONICS
63.10 Plan Check
2/20/03 Valuation
8/19/03
Fee
.00
o
Qty
2.00
.1.00
Unit Charge Per
11.1000 ECH
40.9000
EL-LVT-ADD THERMOSTAT
EL-LOW VOLT SYS <=2500 SQFT
Extension
22.20
40.90
.~
~
---
Fee summary. Charged Paid Credited
Due
----------------- ---------- ---------- ----------
----------
Permit Fee Total 63.10 63.10 .00
.00
Plan Check Total .00 .00 .00
.00
Grand Total 63.10 63.10 .00
.00
~
~
~
'-
C/\
:l
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction orwork is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Owner (if owner is builder)
Date
Signature of Contractor or Authorized Agent
Date
T:\PLANNING\FORMS\ 11 02.15 [4/2002]
BUILDING PERMIT INSPECTION RECORD
'J CALL 417-4815 FOR BUILDING INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE I ACCEPTED COMMENTS
YES NO
FOUNDATION: .
FOOTINGS
WALLS
FOUNDATION DRAINAGE
ELECTRICAL (LIGHT DEPT) SEPARATE PERMIT: #
ROUGH-IN
PLUMBING
UNDER FLOOR 1 SLAB
ROUGH-IN
WATER LINE
GAS LINE
BACK FLOW 1 WATER
AIR SEAL
WALLS
CEILING I
FRAMING
JOISTS 1 GIRDERS
SHEAR WALL
WALLS 1 ROOF 1 CEILING
DRYWALL
T-BAR
INSULATION
SLAB
WALL 1 FLOOR 1 CEILING
MECHANICAL
HEAT PUMP
WOOD STOVE 1 PELLET 1 CHIMNEY
HOOD 1 DUCTS
PW UTILITIES 1 SITE WORK (Engineering Division) SEPARATE PERMIT #'s:
WATERLINE 1 METER
SEWER CONNECTION
SANITARY
STORM
PLANNING DEPT. SEPARATE PERMIT #'s SEPA:
P ARKING/LIGHTING ESA:
LANDSCAPING SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCYIUSE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
ELECTRICAL - LIGHT DEPT. 417-4735 ELECTRICAL .kr:f0
LIGHT DEPT t-;; 8-03
CONSTRUCTION R.W.I PWI CONSTRUCTION - R.W.
ENGINEERING 417-4807 PW 1 ENGINEERING
FIRE 417-4653 FIRE DEPT.
PLANNING DEPT. 417-4750 PLANNING DEPT.
BUILDING 417-4815 BUILDING
T:\PLANNING\FORMS\1102.15 [4/2002]
ELECTRICAL PERMIT APPLICATION
FOR OFFICIA~ USE ~ Y ~
Da.eIKc\:: ~ :;. ~ -:.
Pmnillf: I
Dale App,u""d:
Dale Issued:
The Electrical Permit Application must be filled out completely.
Please type or reprint In ink. If you have any questions, please call (360. 417-4735
Fax number: (360) 417-4711
Owner or Elec. Contractor Agent: JI;.('! C-c..f/ G~AJICJ:;
Property Owner: ~ f"Y\ 1IJ4i.X:W~~
Phone: "'5-;) -,). 7')-7 Fax: tfS;)' ~S-bO
Phon~:
Address:
City:
Zip:
Electrical Contractor: #, 'Tli:-H G:.... ~ c-s
Address: 7'?- I - IE F~'-"'" ?r
Ucense #:
Exp:
Phone:
INSTALLATION WIRED BY:
DOWNER
City: fbz=r J4~g
~ ELECTRICAL CONTRACTOR
Zip: 9K3IO;?--
Credit Card Holder Name:
Exp. Date:
Zip:
VISA:
Billing Address:
City:
Credit Card Number:
MC:.....,
PROJECT ADDRESS:
JDZ, I E: Z V1~
Check all that apply: )i.New
o Alteration! Addition
TYPE OF WORK:
o Residental 0 Multi-family '0 Commercial 0 Mobile Home. . Sq. Ft.
o Remote Meter 0 Detached garage 0 Hot Tub 0 Swim Pool 0 septicp,ur,nP)JI.LOW Voltage ~Teiecom. 0 Si,
Number of Circuits added or altered: j,'. "
DESCRIPTION OF THEELEcTR;~~~ PROJECT: .fl, if' "5J9fT
, .. j . ;'. r .:,~-
b ~\,U Y-
1AJ(fL,:f " ,;f!ciL ,/iRr:
. ~
Electrical Heat Load Additions
(03. \:0_
~
serVice Information
o Overhead Service
o Temp Service
o Underground Service
Voltage:
Phase: 0 1
Service Size:
Feeder Size:
o Baseboard
o Furnace
o Heat Pump
o Fan-Wall
~KW
_KW
_KW
-KW
03
i
PAMC 14.05.060(B): For industrial, commercial, & residential projects larger than a duplex, a one -line drawing of ~e EI8ctrical Service ~
Feeders, building size (sq. ft.), load calculations, and the type & of conductors and/or raceway is required and shall accompany the
Electrical Permit application. .,.,
I hereby certify that I have read and examined this application and know that same to be true and correct, and I B
authorized to apply for this permit. I understand it is not the City's legal responsibility to determine what permits
are required; it remains the applicants responsibility to determine what permits are required and to obtain such.
Credit Card Holder's Signature:
Owner or Elec. Cont., Signature: ~ jJ~
Date:
Date: ~/7?/z.>3
PW-9019
fiI... C 6J.u- - 1"'~1-.!I
..I , """, u
"oi,
ELECTRICAL PERMIT SUBMITTAL REQUIREMENTS
INSPECTOR OFFICE HOURS 8 - 9am AND 1 - 2pm
NO INSPECTIONS WILL BE MADE UNTIL PLANS HAVE BEEN
APPROVED AND A PERMIT BAS BEEN ISSUED!
WffEN IS AN ELECTRICAL PERMIT REQUIRED?
BEFORE ANY ELECTRlCAL ADDmONS OR AI.. TERATIONS HA VB BEEN STARTED
WffO MAY APPLY FOR AN ELECTRICAL PERMIT?
1.) ELECTRICAL CONTRACTORS OR TIlEIR REPRESENTATIVES
2.) OWNER OF A BUIT..DING; UNLESS THE BUILDING IS NEW AND FOR RENT OR SALE
WffEN ARE PLANS REQUIRED?
1.) ALL NEW SINGLE AND MULTI-FAMILY RESIDENTIAL PROJECTS.
2.) ADDmONS AND REMODELS WITII ANY NEW ELECTRJCAL WIRING, REQUIRING MORE
THAN FOUR BRANCH CIRClITTS
3.) ALL COMMERCIAL AND INDUSTRIAL PROJECTS.
4.} PROPERTY OWNERS PERFORMING THEIR OWN WIRING
WJlAT IS REQUIRED FOR A COMPLETE ELECTRICAL PERMIT SUBMITTAL? 50 16
1.) AN APPLICATION FILLED OUT IN ITS ENTIRElY ' "
2.} FEE PAYMENT IN FULL
3.) PLANS MUST CONTAIN TIlE FOLLOWING:
a.) WIRING PLAN (SHOWING TIlE UGHTING, RECEPTACLES~ PANEL & ., S s.. ~ 0
DISCONNECT LOCA n:ONS, SERVICE LOCATION & SIZE) , " "'~'
b.) PHASE(S), VOLTAGE, & AMPERAGE '
c.) LOAD CALCULATIONS & PANEL SCHEDULES (COMMERCIAL, INDUSTRIAL
& RESIDENTIAL REMODEL AND ADD~O~S), "',i ,j, ,
el) DETAILED RISER DIAGRAM (COMMERCI4;& INDUSTRIf.\L) 'SHOWING
BREAKER, CONDillT & WIRE SIZE AND TYPE '
L) 0 '7 0
z.
. .~t
.
WlIEN ARE PLANS REQUIRED TO BE PRF;P ARED BY AN ELECTRICAL ENGINEER?
l.} EDUCATIONAL, INSTIlUTIONAL, OR HEALTH CARE FACILITIES AND OTHER
BUILDINGS PER WAC 296-46A-140
2.) COMPLEX INSTALLATIONS AND/OR LARGE FACILITIES, AS REQUIRED BY INSPECTOR
tfpw MUCH DOES AN ELECTRICAL PERMIT COST?
REFER TO TIlE ELECTRICAL PERMIT FEE SCHEDULE FOR APPROPRIATE FEES FOR YOUR
PROJECT. COSTS FOR PERMITS VARY DEPENDING ON THE SCOPE OF WORK..
tfpw LONG DOES IT TAKE TO GET AN ELECTRICAL PERMIT?
IF PLANS ARE REQUIRED, PERMIT ISSUANCE FOR MOST RESIDENTIAL PROJECTS WILL
NORMALLY TAKE'LESS THAN TIlREE WORKING DAYS. COMMERCIAL PROJECTS MAY
TAKE LONGER DEPENDING ON THE COMPLEXITY OF THE PROPOSED INSTALLATION.
WlIEN AND HOW ARE ELECTRICAL INSPECfION SCHEDULED?
1.) BEFORE COVER AND AGAIN WHEN ALL DEVICES AND EQUIPMENT ARE INSTALLED.
2.) INSPECTIONS ARE SCHEDULED BY CALLING 360 4174735 BY 7:00am \"'>-\ ...... \\. ~
I! t\ - t".. \ _ -,..~.) .) ~~