HomeMy WebLinkAbout1304 O St Technical - BuildingTECHNICAL
Permit 3 7
Address
130{ 0 Sf
Project description 1Q4J S FZ
Date the permit was finaled t
Number of technical pages 2)()
4-
PLAT 62893
FOR
Suntel Home Design
In return for payment of a one -time fee, f Ui%v Designs Engineenng, Inc. grants
you a limited license to use the Analysis to construct one single house a the address shown
below
Site Location Lot 5 Rolling Hills, Port Angelos, Washington
Copyright 8851 (please refer to this number when requesting customer support)
NOTICE' If the Building Department accepts the Analysis without an engineer's
original "wet- stamp" seal signed with red ink or for different site location than shown above,
then it is agreed that such Building Department accepts total liability out of or in connection
with this Analysis.
AND
CAN NOT BE USED
CALCULATIONS, SHEAR SHEET, L -SHEET VALID ONLY WITH
ORIGINAL STAMP HERE AND DIGITAL STAMP ON PLANS
AFTER
DECEMBER 2006
e7'Lte&P/ D ESIGNS ENGINEERING, INC
12560 N W Welsh Dr
Portland, OR 97229
(503) 533-5100
Designs Engineering, Inc
Project. Coventry By RF Sheet No
I rle #62893- 100D -D2 -WA Date 6/2005
Client: Suritel Home Design Job No 1842 1 /1(.0
IJATERAL ANALYSIS
LIABILITY LIMITATIONS
OWNERSHIP OF DOCUMENTS
ANALYZE BUILDING FOR ONLY WIND SEISMIC FORCES
according to the
2003 INTERNATIONAL BUILDING CODE,
WIND ANALYSIS FOR EXPOSURE "D" 100 MPH (3 -sec Gust)
SEISMIC ANALYSIS FOR ZONE 1)2
e�''t,e Designs Engineering, "FDE was retained in a limited capacity for this project. Design is
based upon information provided by the Client, who is.solely responsible for accuracy of same No responsibility
and liability is assumed to FDE for items beyond that shown on these sheets No construction observatigns nor
soils i nvestigations performed by FDIC'
INDEMNIFICATIONS BY BUILDING DEPARTMENT
Building Department agrees to defend, indemnify and hold harmless FDE from any loss, costs, damage,
expense. including attorney fees upon trial or appeal, for liability arising out of or in connection with
FDE's Analysis unless Analysis is used for specific site location shown on cover parse and contains an
original enseineer's "wet stamp" seal sinned with red -ink (no photocopy allowed).
All documents produced by FDE shall remain the property of FDE and shall not be used unless accompanied by ar
original engineer's wet stamp issued from FDE
Designs Engineering, Inc
OAP-
ING;ICATED
n!!!!!!!!!!!!!!!!!!!!!'
RR;
11 11 1 1 1 1 1 11" 7
EOM MOM E:
ism mum
I. MliglIMMIHNEHHOI
IjU 11.0.0 1111111111111111E1111111 1111
Mai 164 116-4--
Ho
IV
1•••
.111111IMIII.MMIIIMMIUMMIMMMIMM
ili II M..M..11DMMMMMIIIMMMIMMMMMI
'"..1!!!!! 11.111011 II 11111 iiiiiiii 1 i n
.1 III IlillIllill I vt: 1111 11 n11'11'1)11 II II
1111
owmil om I
11 1 1
l
111.1 I t 111111111 11
'9 III i;• iniimit I I I IIIIIIIII 11
111111111 11 11
III 111 III 1111
A-AB A.
IN MMMMM 111111•••11111 MMMMMMMM
ION 111•11111•1111111111•111111111 MMMMMMMM
.=_LVA CD'
SCALE 125
BRICK EDGED CONCRETE STOOP
Project Coventry
File #62893-100D-D2-WA
Client: Suntel Home Design
,..."...1" I
1
...S,
',IA.
rr)
ROOFING OVER
ONE LA rEtz 15. ASP 1545E <DYER
Ill" COX PLY SHEATHING
INE
1111111111111
MUM
By RF
Date 6/2005
Job No 1842
12
16`
P
lb/0 X 7/0 OA GARAGE DOOR
Sheet No
TYPICAL ALL
Designs Engineering, Inc
Project. Coventry
File #62893-100D-D2-WA
Client. Suntel Home Design
SCALE VS' l'-0'
SCALE VS
LVAO
11•111
1111111111111
11111111111111
1111111111111
1E1111111111111 111
1
1111111imlo nmone "--21111•11111111111
m
a mt
man
By RF
Date 6/2005
Job No 1842
Sheet No
3/ I
1,e)
2ND FLOC212
1S1 FLOOR L. I
Designs Engineering, Inc
a 11P,F MMIIMIIII WM1I OR 1 1,1 11 1 111
1 1 1
1 1 1 6 1 1 1 1 1
1 1 1 11 1 1 1 1 1
�f 1 f
1 1 1 1 11
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 I I I I 1 1 I I
I I i I 1 1 1 1 1 1 1 1
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I I I I I I I I I I
I I 1 1 1 1 I 1 I I I 1__-
4
I
I I I I I I I I I I I I I I I I I I
i l l l l l l l l
T► I I I I I I I I
J
1 1 1 1 1 1 1 1
J L 1 1 J I L 1 1
1
Project Coventry By RF Sheet No
File 462893 100D -02 WA Date 6/2005
Client Suntel Home Design Job No 1842 4 i
1
SPACE ROOF SHTHG FASTENERS AT 6 O.G. AT ALL INTERMEDIATE
FRAMING MEMBERS EACH SIDE OF EACH RIDGE, HIP AND WITHIN
A 5 -0' WIDE NAILING ZONE AROUND THE ENTIRE PERIMETER OF
HE HOUSE (NAILING ZONE WIDTH STARTS AT EDGE OF ROOF)
1 1 1 1 FASTEN EA. TRUSS TO TOP
WALL PLATE W/ SIMP 1H6
1 1 1 1 .i 4 EA. STUD TO TOP WALL
WI SIMP 5P2
1 1 1 1
Project. Coventry By RF Sheet No
File #62893 100D -I)2 WA Date 6/2005
Designs Engineering, Inc Client Suntel Home Design Job No 1842
30' (MIN)
WIDTHS
4),
47‘ Y (7
0 0,
r
!VIII 10'fl.`.. wr
H) =ApER
SEE DETAIL "9
EXTEND HEADER OvER ENDWALLS
MA' CDC
r
egate/d.
Designs Engineering, Inc
SEE
S gONCRETE STEMIUALL
w /I6 X S CONT FIG.
r1 T. -1
L �42' x 24 x12 FTC
w/ (3)'4
Project Coventry
Pile 462893 100D-D2 WA
Client Some! Home Design
By RF
Date 6/2005
Job No 1842
Sheet No
4
l co
SEE DETAIL '9
EXTEND HEADER OVER ENDWALLS
Data.
Designs Engineering, Inc
WIND ANALYSIS USING 2003 IBC SIMPLIFIED WIND METHOD
W Total Wind Force Y x lx P x A
Y =161 I• =10
FRONT REAR WALLS
SIDE WALLS
Project. Coventry
File #62893- 100D -D2 -WA
Client. Suntel Home Design
Zone Horizontal Pressure
A Pa 17 8 psf
B Pb 12.2 psf
C Pc 14.2 psf
D Pd 9 8 psf
By RF
Date 6/2005
Job No 1842
Reference 2003 IBC Figure 1609 6.2 1
Projected Area
Aa 85
Ab 0
Ac 390
Ad 0
sq ft.
sq ft.
sq ft.
sq ft.
Sheet No
W Y I (Pa Aa Pb Ab Pc Ac Pd Ad) W 1 14 x 10 pounds
Distribute. wind force to roof and second floor level
FRw1 Y I (0 7 Pa Aa 1 0 Pb Ab 0 7 Pc Ac 1 0 Pd Ad) FRw1 7 95 x 10 lbs
F2w1 Y I (0 3 Pa Aa 1 0 Pb•Ab 0 3 Pc Ac 1 0 Pd Ad) F2w1 3 41 x 10 lbs
Zone Horizontal Pressure Projected Area
A Pa 17 8 psf Aa 85 sq ft.
B Pb 12.2 psf Ab 50 sq ft.
C Pc 14 2 psf Ac 450 sq ft.
D Pd 9 8 psf Ad 380 sq ft.
W Y I (Pa Aa Pb•Ab Pc Ac Pd Ad) W 1 97 x 10 pounds
I
Distribute wind force to roof and second -floor level
FRw2 Y I (0 3 Pa Aa 0 7 Pb•Ab 0 3 Pc Ac 0 7 Pd Ad) FRw2 8 7 x 10 lbs
F2w2 Y I (0 7 Pa Aa 0 3 Pb•Ab 0 7 Pc Ac 0 3 Pd Ad) F2w2 1 1 x 10 lbs
Designs Engineering, Inc
SEISMIC ANALYSIS USING 2003 IBC SIMPLIFIED ANALYSIS PROCEDURE
Data. 1 =1 0 Sd 1 30 R 6 5 r 0 45 (worst case)
E Earthquake Base Shear 1 2 p Qe 1 4 1.2 p (Sd W/ 1 4R)
Weights
Mass Calculations
Roof Dead Load 15 psf (Composition Roof Covering)
Floor Dead Load 10 psf
Partitions 10 psf
Exterior Walls -I- Windows 10 psf (Average)
Aroof 1100 tt ^2
A2ndFloor 900 ft^2
A l stFloor 1800 11^2
h2• =21 ft
Mroof 20 Aroof 10•Aroofwall
M2 20 A2ndFloor 10 A2wall
p• =2—
20
r.V A2ndFloor
E 1.2 p 1
Sd
4 R (Mroof M2) E 1 05 x 10 pounds
Distribute Seismic Shears
D Mroof h2 M2 hl
FRe Mroof h2 E
FRe 6 86 x 10 pounds
D
M2 hl
F2e
D
Project Coventry
File #62893- 100D -D2 WA
Client. Suntel Home Design
By RF Sheet No
Date 6/2005
Job No 1842 (p
Aroofwall 7006 1 \2
A2wall 1400 ft^2
A 1 wall 0 ft ^2
hi 10ft
Mroof 2 9 x 10 pounds
M2 3.2 x 10 pounds
p =if(p< l,1,p)p= 1
D= 9.29x10
F2e 3 6 x 10 pounds
Designs Engineering, Inc
Project Coventry
File #62893 100.D -D2 WA
Client Suntel Home Design
By RF
Date 6 /2005
Job No 1842
INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH
Analyze entire brace wall line as a series of perforated shearwall panels using worst -case "maximum o ening
height ratio Individual perforated shearwall panels extend between plan discontinuity Overturning fbr such
panel is calculated by rational analysis Reference Section 2305 3 7.2 2003IBC
Unadjusted in -plane shear force for brace wall line, FRe 2950#
Percent full height sheathing 8 ft. 16 ft 50%
Maximum opening height ratio 4ft 8 ft 0 50
Shear resistance adjustment factor, Co 0 8 (Ref Shear resistance adjustment factor table)
Amplified in plane shear, V Unadiusted shear force for brace wall line
Shear resistance adjustment factor x Total length of full height walls
FRe (Co x L) 2950# (0 8 x 8 ft) 460 plf
Uplift at perforated shearwall ends calculated based on rational analysis (use only 50% of weight
of first individual full height wall segment for dead load)
2/3 average weight of full height wall segments and portion of roof framing, Wd 110 plf
2/3 dead -load reaction at end of shearwall or corner restraint, R1 400#
Uplift at end of perforated shearwalls, Pu Vf x hl Wd x (0 5 L1) R1
460 plf x 8 ft 110 plf x (0 5 x 4 ft) Rl 3100#
Uplift between wall ends, t V- Wd 460 plf 110 plf 350 plf
Wall bottom plate (1 1/2" thickness) to rim joist.
Use 16d common nails (0 162 by 3 1/2 inches)
Lateral resistance 1 33 x 141# 187# per nail
Withdrawal resistance 1 33 x 40 ph x 2.5" 133# per nail.
Nails for shear transfer 460 plf 187# per nail 2 4 nails per foot
Nails for uplift transfer (460 -110 plf) 133# per nail 2 6 nails per foot
Net spacing for shear and uplift 2 4" o c
Sheet No
ko
Rim foist to wall top plate
Use 16d common nail (0 162 by 3 1/2 m.) toe nailed to provide shear transfer
Lateral resistance 0 83 x 187# per nail x 1 5 nails per ft. 230 plf (150# per nail default maximur
for seismic loads) plus Simpson "LTP5" framing clip capacity 630#
Net spacing for shear using LTP5 clip and 16d toenails at 8" o c 630# (460- 150 24" o c
Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor
wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced
moments and shears Continuity of load path is provided by holdowns at ends of the perforated shear wall.
Use Tvne "C" shearwall w/ HTT22 holdowns. 16d at 2 1/2" o c. sole plate nailine and LTP5 clips at 24" o.c
Designs Engineering, Inc.
RI 400"
FRe 2950"
I- IOLDOWN
Pu 3100"
ELEv4
s
4 -0'
P.S.W. Segment
WALL HEIGHT
EAR IR
Project. Coventry
file #62893- 100D- D2 -WA.
Cl lent Simnel Home ]:Design
ESISTA
5, -OY
Perforated Shear Illall
\CE ADJUST
ION OF FEIR 5
By RF Sheet No
Date 6/2005
Job No 1842
4 -0'
P.S.W. Segment
E RLU4LL
MAXIMUM OPENING HEIGHT RATIO AND HEIGHT
1-1/3 1-1/2 I 2H/3 I 21-1/5 H
8' -0' I 2' -5' 4/ -0' I 5 -4 I 6 -5' 8 -0'
Percent Full Height 5heathln91 Shear Resistance Adjustment Factor
10% 1.0 0.59 053 043 0.36
20% 10 011 0.55 045 0.38
30% 1.0 014 059 049 042
40' 1.0 011 063 053 045
50% 1.0 0.50 061 0.51 0.50
60% 1.0 0.53 011 0.63 0.56
109' 1.0 0.51 011 069 I 0.53
809 1.0 0.91 0.53 011 011
NT FACTOR
Project. Coventry By RF Sheet No
File #62893 100D -D2 -WA Date 6/2005 J j
Designs Engineering, Inc Client. Suntel Home Design Job No 1842
INVESTIGATE UPPER 1 LOOR SHLARWALLS.
Line "A"
Rear Walls
Line "C"
Front Walls
Summation of full height walls lengths L 23 ft.
Total length of brace wall line TL 31 ft.
full. height sheathing S L 100 S 74 19 percent
TL
I:)iagluagm stress v 0 5 T v 128 17 plf
Shearwall stress v 0 5 FR v 191 94 plf
09L
Weight Wd 160 pl.f
Uplift for shearwall length L1 8 ft. R1 400
(worst case)
Pu v 8 5 Wd Ll R1 Pu 495 55 pounds
Use Tyne "B" Shearwall w/ no holdowns
Summation of full height walls lengths
Total length of brace wall line
full- height sheathing S L 100 S 51 61 percent
TL
Diaghragm stress v 0 5 FR v 128 17 plf
TL
Shearwall stress v 1 75 0.5 FRe v 374 89 plf
(Seismic)
Uplift for shearwall. length L1 2 ft.
(worst case)
Pu =v8— 5 Wd L1 R1
Use Type "C" Shearwall w/ MSTC52 holdowns
L 16 ft.
TL• =31 ft.
Weight Wd 160 plf
R1 400
Pu 2.44 x 10 pounds
Designs Engineering, Inc
INVESTIGATE UPPER FLOOR SHEARWALLS.
Line 1 Walls
Line 2 Walls
Project. Coventry By RF Sheet No
File #62893 100D -D2 -WA Date 6/2005 Zl
Client. Suntel Home Design Job No 1842 (p
Summation of full height walls lengths L 19 ft.
Total length of brace wall line TL 27 ft.
full height sheathing S =L 100 S 70.37 percent
Diaghragm stress v 0 5 FR v 161 14 plf
TL
Shearwall stress v 0 5 FR
L
Uplift for shearwall length L1 18 ft.
(worst case)
Pu =v8— 5 WdLl —R1
Use T vne "B" Shearwall w/ no holdowns
Summation of full- height walls lengths L 20 ft.
Total length of brace wall hne TL 27 ft.
full height sheathing S L 100 S 74 07 percent
TL
Diaghragm stress v 0 5 F v 161 14 plf
TL
Shearwall. stress v 0 5
FR
L
Uplift for sh.earwall length L1 19 ft.
(worst case)
Pu =v8— 5 WdLl —R1
Use Tvne "B" Shearwall w/ no holdowns
v 228 99 plf
Weight Wd 110 plf
R1 400
Pu 441 91 pounds
v 217 54 plf
Weight Wd 110 plf
Rl 400
Pu 295 31 pounds
Designs Engineering, Inc
Rear Walls
Line A
Front Walls
Lane l3
Project. Coventry
File #62893 100D-D2-WA
Client: Suntel Home Design
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Summation of full height walls lengths L 8 ft.
Total length of brace wall line TL 30 ft.
full height sheathing S 100 S 26 67 percent
TL
F2w1
Diaghragm stress v 0.2 v 22 7 plf
TL
0 5 FRw1 0.25 F2w1
Rim/blocking stress v v 160 82 plf
TL
Seismic Shearwall 1 75 (0 5 FRe 0.25 F2e) v 946 76 plf
stress w/ wall aspect L
ratio penalty
0 5 FRe 0.25 F2e
Shearwall stress v v 541 01 plf
Uplift for shearwall length L1 2 ft.
(worst case)
Pu v 9 5 Wd L1 R1
Type "D" Shearwall ANI) I vpe "F" Shearwall at narrow width walls w/ PHD8 holdown5
Summation of full height walls lengths L 9 ft.
Total length of brace wall line TL 15 ft.
full height sheathing S L 100
TL
F2w1
Diaghragm stress v 0 3
TL
Rim /blocking stress v
0 5 F2w1
TL
Seismic Shearwall 0 5 F2e
stress w/ wall aspect v L
ratio penalty
By RF
Date 6 /2005
Job No 1842
Weight Wd 110 plf
R1 400
Pu 4 36 x 10 pounds
S 60 percent
v 68 11 plf'
v 11352 plf
v 200 11 1 of
0 5 F2e
Shearwall stress v v 200 11 pit
L
Uplift for shearwall length L1 8 ft.
(worst case)
Pu =v9— 5 WdLl —R1
Use Type "B" Shearwall w/ HTT22 holdowns
Weight Wd 110 plf
Rl 400
Pu 961 01 pounds
Sheet No
13 rico
Designs Engineering, Inc.
INVLSTIGATE LOWER -FLOOR SI3EARWALLS..
Front Walls
Line C
Uplift for shearwall length Ll 2 ft.
(worst case)
Pu• =v9— 5 WdLl —R1
I vie "D" Shearwall w/ IITT22 holdowns
Project. Coventiy By RF Sheet No
File #62893- 100D -D2 -WA Date 6/2005 14/
Client: Suntel Horne Design Job No 1842 1
Summation of full- height walls lengths L 13 ft.
Total length of brace wall line TL 30 ft.
full height sheathing S L 100 S 43 33 percent
TL
F2w1
Diaghragm. stress v 0.25 v 28 38 plf
TL
0 5 FRw1 0.25 F2w1
Rim /blocking stress v v 160' 82 plf
TL
Seismic Shearwall 1 75 (0 5 FRe 0 25 F2e), v 582 62 plf
stress w/ wall aspect L
ratio penalty
0 5 FRe 0.25 F2e
Shearwall stress v L v 332.93 plf
Weight Wd 110 plf
R1 400
Pu 2 49 x 10 pounds
Designs Engineering, Inc.
Line 1
Project. Coventry
File #62893 100D -D2 WA
Client: Suntel I-lonie Design
INVESTIGATE LOWER -FLOOR SHEARWALLS.,
Summation of full height walls lengths L i 19 ft.
Total :length of brace wall line TL 27 ft.
full- height sheathing S L 100 S 70 37 percent
TL
F2w2
Diaghragm stress v 0 35 TL v 142.59 plf
0.5 FRw2 0 35 F2w2
Rim/blocking stress v TL v 303 73 plf
Shcarwall stress v 0 5 FRw2 0 35 F2w2 v 431 62 plf
L
Weight Wd 110 pif
Uplift for shearwall length Ll 3 ft. R1 400
(worst case)
Pu v 9 5 Wd L1— Rl Pu 3 32 x 10 pounds
Type "C" Shearwalls w/ HTT22 holdowns
Lune 2 Sununation of full- height walls lengths L 32 ft.
Total length of brace wall line TL 35 ft.
full height sheathing S 100 S 91 43 percent
TL
F2w2
Diaghragm stress v 0.25 v 78 57 pif
TL
0 5 FRw2 0 5 F2w2
Rim /blocking stress v v 281 45 plf
TL
0 5 FRw2 0 5 F2w2
Shearwall stress v L v 307 84 plf
Weight Wd 110 plf
Uplift for shearwall length Ll 8 ft. R1 400
(worst case)
Pu v 9 5 Wd L1 R1 Pu 1 93 x 10 pounds
Type "B" Shearwalls w/ HTT22 holdowns
By RF
Date 6 /2005
Job No 1842
Sheet No
1 ry /i1 Co
Designs Engineering, Inc
Project. Coventry
File #62893- 100D -D2 -WA
Client Suntel Home Design
INVESTIGATE LOWER FLOOR SHEARWALLS.
Line 3 Summation of full- height walls lengths
Total length of brace wall line
full height sheathing S TL 100 S 100 percent
F2w2
Draghragm stress v 0.35 v 154 plf
TL
0.2 F2w2
Rim /blocking stress v v 88 plf
TL
Shearwall stress v
0.2 F2w2
L
Uplift for shearwall length L1 24 ft. R1 400
(worst case)
Pu v 9 5 Wd L1 R1 Pu —928 pounds
Tyne "B" Shearwalls w/ no holdowns
By RF
Date 6/2005
Job No 1842
L 25 ft.
TL 25 ft.
Sheet No
I
v 88 plf
Weight Wd 110 plf
L EGEN
DESIGNATES GRID LINE
1
DESIGNATES DETAIL MARK
DESIGNATES SINEARWALL TYPE
DESIGNATES HOLDOWN TYPE
(SEE SHEAR SCHEDULE)
DESIGNATES DRAWING NOTE
DESIGNATES H.D LOCATION (APPROXIMATE)
Designs Engineering, Inc
51-4EARW4LL SCI-IEDULE
MARK WALL COVER FASTENERS PANEL INTERN.
EDGES STUDS
6d WALLED
A 5/8" G.W,B. NAIL OR 1 4" O.C. 4" O.C. 16c1 8 "oc
'W" "6 SCREW
1/16" A.P.A.- 16GA STAPLE
RATED SHT'G 0.131 "4 x 2
0 x 21/4"
NOLDOWN SCHEDULE
NO
HOLDOWN
REQUIRED
"MSTC40"
"MSTC66"
10
"MSTC52
"STHDI4"
"147722"
-OR-
"I-0U 5"
"PHD6"
"1DU -8"
-OR
"HDQ -8"
(15)(16)
"HDU II" or
"H?- IDQfl"
(151(16)
"HHDQ14"
4" O.C.
6" O.0
/C 1/16" A.P.A. 0.131"4; x 2�� 3 O.G. 12"
r2ATED 5NT'G 01484x2 4 4 O.C.
F RH. P -NAIL
1/16" A.P.A. 0.148 "4 x 2 3" O.C.
RATED SHT'G FULL ROUND- STAGRD 12"
,HEAD P NAIL,
1/16" A.P.A. 0.148 "4 x 2
RATED S14T'G FULL ROUND- 4" O.C.
EACH SIDE ,MEAD P NAIL,
1/I6" A.P.A. 0.148 "4 x 21/4" 2" O.C.
RATED 5HT'G FULL ROUND- STAGRD 12"
EACH SIDE HEAD P NAIL
DESIGNATES SIMPSON PRODUCT
MARK4HOLDOUIN 1 FASTENERS
(18) I6d SINKER
NAILS AT EACH END
(24) 16d SINKER
NAILS AT EACH END
(34) 16d SINKER
NAILS AT EACH END
'CMSTI2" (43) 16d SINKER
U 9' -0 "LONG NAILS AT EACH END
(38) 16d
SINKER NAILS
SIMPSON "SSTB24"
SIMPSON "SSTB28"
SIMPSON "SSTB28
SIMPSON "SSTB28"
W/ 9/64" rUT WASHER
4 HEAVY HEX NUT
1" DIA. (A36) GALV
ROD EMBED 8" INTO
12" THK. x 21" WIDE
I0 -0" LONG FTG.
DESIGNATES SHEAR PANEL
AND HOLDOWN TYPE.
DESIGNATES APPROXIMATE
HOLDOWN LOCATION
Project. SIIEARWALI. SCHEDULE By FDE
Location Pacific Northwest Date 3/2006
Client FDE Job No 0000
3" O.G. 6" O.C _II6de 31/2 "oc
12" O.C. STAGRD
O.C. 16d* 2 "oc
STAGRD
O.C.
12" O.C. 16de 21'2 oc
STAGRD
O.C.
NOTES
SOLE (9)
PLATE
16d* 3 "oc
STAGRD
16dm I "oc
STAGIRD
BLOCKING/ (9)
IM JOIST
16cl TOENAILS
AT 5" O.C.
%s" 4 x 1"
EMB. ABe
Sheet No
ALL PANEL EDGES
MUST BE BLOCKED
REMARKS
1 1/2" LONG x 1/16" WIDE
STAPLES W/ CROWNS
PARALLEL WI FRAM'G.
DBL. STUDS/BLKG. AT (5
ADJOINING PANEL EDGES
W/ 16d AT 4" O.G.
DBL. STUDSBLKG. AT l 5)
ADJOINING PANEL EDGES
W/ 1601 AT 4" O.C.
DBL. STUDSBLKG. (8)(I1)
e ADJOIN'G PANEL EDGES
W/ 16d AT 4" 4 3X MUDSILL
3X. MUDSILL AND (8)(11)
"LTP5 "e 3?<. STUDS /BLKG. AT
ADJOINING PANEL EDGES
PER NEW CODE, ALL ANCHOR BOLTS MUST
HAVE 2" SQUARE X 3/16" HDG PLATE WASHERS
(3)
"LTP5 "0 48" oc
(3)
"LTP5 "0 24" oc
(3)
"LTP5 "e 16" oc 10" O.C.
"LTP5 "0
45" O.G.
48" O.C.
16" O.C.
(3)
10" oc 15" O.C.
(3)
6" oc 12" O.C.
1. ALL FASTENERS USED AT THE COAST AND IN CONTACT WITH PRESSURE
TREATED MATERIAL MUST BE HOT DIPPED GALVANIZED (HDG).
2. "F RH. P- NAIL" DESIGNATES A FULL -ROUND HEAD PNEUMATIC- DRIVEN
NAIL (10d GALV BOX NAILS MAY SUBSTITUTE FOR 0.1484 P- NAILS)
3. SIMPSON "RBC" BOUNDARY CLIPS TO SUBSTITUTE FOR "LTP5" AT ROOF
4 514EATHING ON SHEARWALLS MUST EXTEND DOWN TO SOLE 4 MUDSILL
PLATES AND SHALL NOT BE INTERRUPTED BY ANY WALL BUTTING INTO
THE SHEARWALL.
5 PROVIDE DOUBLE STUDSBLKG, W/ 16d AT 4" O.C. AT ADJOINING PANEL
EDGES TO AVOID SPLITTING, NAIL EACH PANEL EDGE TO ONLY ONE 2X.
6 SIMPSON" PRODUCTS SHALL BE INSTALLED AS PER MFG. SPECS
1. HOLDOWNS OCCUR AT ENDS OF SHEAR -WALLS AND SHALL FASTEN
TO A MINIMUM OF (2) STUDS (MIN.) LAMINATED TOGETHER W/ 16cl AT 6 "o.c.
5. USE LONGER FDN. BOLTS WITH 3X MUDSILL AND SET BOLTS HIGHER.
DO NOT INSTALL FDN. VENT WITHIN 12 CLR OF A HOLDOWN ANCHOR BOLT
9. FASTENERS SPACING APPLIES ONLY AT FULL HEIGHT WALL SEGEMENTS,
OTHERWISE USE MINIMUM CONSTRUCTION STANDARDS.
10 USE SIMPSON 'STI- 1D14RJ" INSTEAD OF "STHD14" WITH JOIST FLOOR SYSTEM.
II. WALLS WITH PLYWOOD ON EACH SIDE SHALL OFFSET PLYWOOD EDGE
.JOINTS ON ONE SIDE OF THE 51- IEARWALL FROM THOSE ON THE OTHER.
EXTEND PLYWOOD THROUGH CORNER AS SHOWN IN DETAIL 14 TO
ACHIEVE MINIMUM 51HEARWALL WIDTH SHOWN ON PLANS.
12 514EARWALLS WITH OVERDRIVEN NAILS PENETRATING SURFACE BY MORE
THAN 1/8" WILL BE REQUIRED TO BE RENAILED USE A RUBBER
GROMMET IN HEAD OF NAIL -GUN AND ADJUST AIR PRESSURE 50 NAIL
HEADS ARE FLUSH WITH OR SLIGHTLY RECESSED INTO SHEATHING.
13 ALL STUD WALLS MUST HAVE DOUBLE TOP PLATES W/ I601 AT 8" O.C.
AND STUDS 16" o.c. PLATES SHALL LAP A MINIMUM 4 0" AT SPLICES
WITH AT LEAST EIGHT 16cl NAILS EACH SIDE OF SPLICE
14 HOLDOWN TYPES W/ GREATER NUMERICAL DESIGNATION MAY
SUBSTITUTE FOR 14OLD0WNS WITH LESSER. SEE CHART 70 THE LEFT
15 USE 3000 P51 CONCRETE IN STEMWALL. PROVIDE (2) "4 CONT 7 4 B
IN STEMWALLS WITH THESE HOLDOWNS. EXTEND 10' -0" PAST HOLDOUJNB.
16 FASTEN TO (3) 2x6 FULL -HGT STUDS. FASTEN EACH STUD TOGETHER/W/
(2) ROWS I6d AT 6" O.C. STAGGERED. EDGE NAIL WALL PLY TO EA. STUD
IN SHADED AREAS FASTEN SHTI -IG. AT 4" O.C. AT BOUNDARIES OF
SHAPED AREA AND PANEL EDGES. BLOCK PANEL EDGES W/ 2"
NOMINAL FLAT BLOCKING. USE 8c1 COMMON NAILS FOR ROOF /CLGS.
AND I0d AT FLOORS USE 1/16" 055 OR PLY 51-ITHG. AT CEILINGS.
REFERENCES TO SEE NOTES ABOVE 341 -06
galet.
Designs Engineering, Inc.
t/ APA -RATED
ROOF SHEATHING
BOUNDARY
NAIL (BN.)
2 X SOLID
FRIEZE P.
2 X STUD WALL_
ROOF PERIMETER
I0d a 4" O.C.
SIMPSON 'LTP4'
SEE SCHEDULE
FOR SPACING
SHEARWALL
EXTEND WALL
54111G DOWN
TO TOP WALL
PLACE 1 EN.
EDGE NAIL (EN)
PLY. SPLICE Pt
EDGE NAILING
SIMPSON "LTP4'
o-
TI-118 DETAIL Y8 APPLIES.
TH18 DETAIL ALWAYS APPLIES.
r
CLG. JST
SIMPSON '41" TIE AT
EACH RAFTER ALONG
ENTIRE PERIMETER
NOTE: '410 -2' MAY
SUBSTITUTE FOR "41"
1 APA -RATED
SHEATHING
10d *4 O.C.
PLYWOOD
DECK SHEATHING
X -f- JOIST
1 -2 X BLOCK'G
EA. SIDE a 48"
SIMPSON "LS50'
MAY SUBSTITUTE
FOR 'LTP4'
APA -RATED
SHEATHING
301ST /5I- 1EARUJALL
SOLE PLATE
NAILING SEE
SCHDE FOR INFO
(4) I0d EA. BLK
FLOOR JOISTS
2 X BLOCKING AT
6 -0' OPW /(3)10d
TOENAILS TO PLATE
2 X STUD WALL
15 APA -RATED
SHEATHING
0 PARALLEL JOISTS
THIS DETAIL ALWAYS APPLIES.
Project: Structural Details
Location. Pacific Northwest
Client. FDE
NOTE: SIMP "42.5" MAY
SUBSTITUTE FOR '41' AS
LONG AS "RBC" CLIPS AT
48" o.c. ARE USED TO
CONNECT THE FRIEZE D.
TO TOP WALL PLATE.
y APA -RATED
ROOF SHEATHING
ade4 O.C.
2 X 6 FLAT SLK'G
W /16de4 O.C.
INTO WALL IE
8I- IEARWALL
PLYWOOD
SHEATHING
SI MPSON "LTP4"
SEE SCHEDULE
FOR SPACING
10d a 4' O.G.—\
16d a 8 "o.c.-
SOL ID BLK
WALL
END OF 2x4
DRAG STRUT
By RF
Date: 3/2006
Job No 0000
STRUCTURAL CEIL INCA
I0d a 6' O.G. AT FLOOR
AT DSCR, PROVIDE 2x4
x 5 -0' LONG NAILED TO
BOTTOM CHORD W/ 16d AT
4" O.C. STAGGERRED
PREDRILL HOLES FOR
CONNECTOR SCREWS
DRAG STRUT
Sheet No
2 X SOLID BLO KING
W/ EIMPSON 'LS50'
STRUCTURAL CEILING
IN CROSS -HATCH AREA
—SEE 5I- 1111ALL SCHEDULE
FOR ADDITIONAL INFO.
2 X STUD Ext. WALL
TYPE "C' 51- IEARWALL
SOLID ELK'G.
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTP4'
JOIST
SHEAR/ALL
FULL HEIGHT
1, 3 APA -RATED
SHEATHING
JO IST /SI- 4EARUJALL
1
SOLID BLKG
EA. SIDE 5' -0'
AWAY FROM END
OF DRAG STRUT
CONNECTOR SEE PLAN
FOR SIZE. INSTALL W/
EQUAL LENGTH TO DRAG
STRUT AND WALL.
Designs Engineeting, Inc
3
F' )N WALL
E POND
49 OF
REINF
1,
SOLE PLATE
NAILING SEE
SCHEDULE
PLYWOOD
SHEATHING
r `4
FL
FRAMING u
0 4 CONT HORIZ.
A7 TOP 4 BOTTOM
CONC. STEM WALL
4 -0'
L
NORMAL JOISTS
THIS DETAIL ALWAYS APPLIES.
EDGE NAIL SIDE WALL
8H7H TO 4x6 STUD
7
I MIN. PLY WIDTH 1 d
EA. SIDE I' 10'
f
T• —.I
4 -0'
SIMPSON '1
EA SIPE (4- TOTAL)
1
e-.
W/ STUD EA. ENP
W/ App'L 2X NAILER
s CORNER W/ 1601 6
SIMPSON 'PHD6
4x6 PLATES W/ (2) 6/8'4X12'
J -SOLTS AT 6 oc. W/
SIMP '5 S' WASHERS
(2) ROWS OF NAILS AT 11/2'
STAGGERED TO MUDSILL
lit APA RATED
SHEATHING FASTENED
TO MUDSILL PLATE
Project: Structural Details
Location. Pacific Northwest
Client.
FDE
EDGE NAIL. (EN)
SIMPSON 'L860' ANCHOR
(NOT REQ'D IF SHTH'G
EXTENDS CONT TO MUDSILL
W /OUT ANY JOINTS)
EDGE NAIL (EN)
x10'ABbW/
2 X 2 X 3/16
PLATE WASHERS OR
SIMP 'SP6/8 -2'
0 4 DOWELS m 48' O.C.
1.
NAIL. SHEATHING 70
HEADER W/ 0.148'4 x
2 F RH. P -NAILS
3 O.C. 501H WAYS
�a APA -RATED SHTH'G
FROM A SINGLE SHEET
BOTH SIDES W/ 0.148'4
F R14. P -NAILS INTO
4x6 W/ (2) ROWS AT 2' oc.
EXTEND PLYWD THRU
CORNER SEE PET 14
6x SOLID BLOCKING
AT SHEATHING SPLICE
1 -4
0 4 x I I 2 3
HAIRPIN DAR
1 1 1.. {I
1 -rr 8' CONCRETE WALL W/
(2) DOWELS EA. END
{.1 UNDER SHEARWALL
NOTE
EXTEND GARAGE
DOOR HEADER
OVER ENPWALL.
HEADER WIDTH TO
MATCH WALL WIDTH
12' DEEP x B'
0 4 X -6 CONT FTG. W/
8-0 /„4 CONT T 4 13
24' x 48' X 12' FTC.
W/ (3) M CENTERED
G RAGE -F RAME DETA1LDELOW RAISED STEMWALL
(4) 1001 0 3 0.C.—
PLYWOOD
DECK SHEATHING
By' RF
Date 2/2006
Job No 0000
II 111111111111/1/1111111/1111111111 II 1111111111111111111111 11Y
I..1
a
J
L
IF FLOOR JOIST
SYSTEM, PROVIDE
2 X BLOCKING
m
12' o.G. W/ (3)
1001 TOENAILS
TO PLATE
CONC. STEM i
WALL
Ie
PARALLEL JOISTS
THIS DETAIL ALWAYS APPLIES.
PONYWALLS 4 -0' AND TALLER MUST DE
APPROVE BY ENGINEER. OTHERWISE OK
:I
iPON'I'IUiki:I. to +I
I 'TTi- 1tBNEA
1 •i OJIR �IENT3 L,
si is
1 l I I Y 11
't
CONCRETE FOUNDATION
0 4 DOWELS 0 48' O.G.
Sheet No
—1- APA RATED
SHEATHING.
SOLE PLATE
NAIL ING
EDGE NAIL (EN)
SIMPSON 1L880' AT
SAME SPACING AS 'LTP4
EDGE NAIL (EN)
0 4 CONT HORIZ T 4 B
0 4'4 x 10' AB's W/
2 X 2 X 3/16
PLATE WASHERS OR
SIMP '5P8/6 -2'
i *4 DOWELS 48' O.C.
MIN. (2) 2X6 STUDS AT
HOLPOWNS EDGE
NAIL PLY TO STUDS
HOLD
436 THREADED
ROD WITH SAME
PIA TER AS
ANCI -OR BOLT
SIMPSON 'CNW' COUPLET
1 '•.111L4--
p '81U1F*SON 'BT46 BOLT
!4COt'T I n
i1 •i
NOLDOWN PONYWAL
t-
h
Q
Designs Engineering, Inc.
1 i RATEP—
WALL
BNEATHIIVG
EDGE NAIL..—
SHEATHING
EDGE NAIL
PLY 7O
HOLDOUN
STUDS
(2) -2 X 6
BLOCKG
SIMPSON "LTP4 1
SEE SCHEDULE
FOR SPACING
2 X STUD WALL
1 'i RATED
WALL SHEATHING
RIM JOIST
JOIST
SIMPSON "L850"
MAY SUBSTITUTE
FOR "LTt'4'
CANTILEVER JST
LAM. STUDS
TOGETHER W/
I6d AT 6 O.C,
GRADE A36"
THREADED ROD
8EE SIMPSON
CATOLOG FOR
DIAMETER
I I II II TA.A6) THREADED' ROLE U P
}I• 1p UU. SII" IPSPN. "SET" ADHESIVE. AU. •81tlP 'HDIOA'
1 .1_10) USE 1QJ" EMBEDT1ENT •DEPTH u d tg0IIRES 15'
r II EXCEPT 4 -ID10A (SPECIAL EMBEDMENT
ii INBPEtSTiON'IS'.RECIUIRED) DEPTH
tl CONCRET.E FOUNDATION'
13 MISSING NOLDOUJN ANCHOR
8EE PLAN IF PLYWOOD
CEILING I8 REQUIRED.
FASTEN RAFTER TO WALL
PLATE W/ SIMPSON "HI"
8EE PET 1 FOR ADD'L INFO.
SOLE PLATE
NAILING
BOUNDARY
NAIL
1: BLKG.
HOLDCU 1
BOUND. NAIL ROOF PLYWD. TO
2 X 10 LEDGER W/ BEVELED
TOP TO MATCH ROOF SLOPE.
NAIL LEDGER W/ (2) -I6d EA
WALL STUD 4 EA 2 X 6 BLKG,
FOR THIS SECTION OP ROOF,
BLOCK PANEL EDGES W/ 2 X 4
FLAT NAIL ed 4 O.C. EDGES
AND BOUNDARIES, 12' O.C. IN FIELD.
ROOF LEDGER DETAIL
Project DETAILS
Location Pacific Northwest
Client FDE
SHEARWALL PLYWD MUST EXTEND
DOWN TO BOTTOM WALL PLATE
lTY\
VI RATED
WALL
8HEATHING
(2) -2x OR---
4x (REF TO
PLANS)
I- IOLDOU.N
STRAP WRAP
AROUND DBL.
JOISTS
UPSIDE DOWN
SIMPSON
"THAC222 -2'
FASTEN TO
DBL JOISTS
4x6 OR
(2) 2X STUDS
12 1- IOLDOUJN TO RIM J5T
Sd AT 6 o.c.
AT ALL FRAMING
MEMBERS WITHIN
5' -0' OF EDGE
IF THIS 1S A 61-1'WALL
W/ A HOLDOWN,
THEN EXTEND BHTH'G
THRU t EDGE NAIL
NOTE;
T14I6 DETAIL IS REC"YD.
ONLY WHEN TWO 1.
SHEARWALLS SHARE
CNE HOLDOUN.
8HTHG.
GABLE END TRUSS
i
EITHER NO
JOINT IN PLYWOOD
OR
FASTEN 8H'WALL TO
ENDWALL TRUSS W/
BLOCKING/RIM
FASTENERS SHOLLN
IN 814'WALL SCHD'L.
6H'WALL SEE
SHWALL SCHEDULE
FOR NAIL'G REQMT8.
By RF
Late 1/2005
Job No 0000
A
SOLE PLATE
NAILING
BOUNDARY
NAIL
c SOLID BLKG.
RIM 1� L SIMPSON "L550"
KG, OR S MAY SUBSTITUTE
RIM JST •1 FOR 'LTP4"
GOVT
2X BL
JOIS
—1 --DBL. JOIST AT
EACH END OF WALL
OVER DBL. STUDS
FASTEN TO RIM JOIST
W/ SIMPSON 'L'30"
Sheet No
16c1 AT6 00.
HOLDOJN
I6d.AT 6" O.G.
INTO EA STUD
EDGE NAIL
FRAMING AT CORNER
2x4 FLAT AT 24' O.C.
IN END -WALL TRUSS
2X VERTICAL BRACE
(2) 10d AT 8" OC,
2x4 BLKG, AT 6' -0' O.G.
W/ 8d AT 3' O.C.
TRUSS BOTTOM CHORD OR CEILING JOISTS
(2) 16d EA. TRUSS
2x4 x 8' -0' LATERAL
NAILS BASED rl BRACE AT 6' -0' o.c.
ON 8HEARWALL I (6) 16d NAIL
REO,MTS. BELOW
DBL. 2xSOLID BLOCK
W/ (2) GIMP "L8SO'
TO WALL PLATE
2x6 PLATE W/ I6d
AT 12" o.c. TO WALL
GYPSUM BOARD
DIAPHRAGM WITH
Sd COOLER NAILS
AT 1" 0.O. AT FIRST
(4) CEILING MEMBERS
AND 2x6 PLATE
GABLED ENDUJALL
11" "H" EXCEEDS 6 -0" THEN INSTALL
2x4 ON EDGE BEHIND 2x4 FLAT M
END -WALL TRUSS. IP "H" EXCEEDS
I2' -0' USE 2x6 ON EDGE. SEE ABOVE.
Designs Engineering, Inc.
INTRFLOOR
SHEAFUALL?
CUT Lci x 4"
SLOT N SHTHG.
ROOF
TRUSS
1 C7
I
8d AT 3" 0.C.
INTO 2x4 BLKG.
FOR TRUSS FRAMED ROOFS
I..-- (2) -2x OR 4x
(REF TO PLANS)
WOLDOU.N STRAP
2x SOLE IE I (INSTALL STRAP W/
SEE SCI-ID\
EQUAL LENGTH TO
FOR INI O L 1 BEAM 1 STUDS.
I T I 7 4
f
1--- DBL. JOIST
OR BEAM
\-2x SOLID BLKG EACH
SIDE NEXT TO STRAP
I- 10L DOWN DETAIL
NOLDOWN
(2) 16d INTO TRUSS T &B CHORDS
2x KG.
4 AROUND BL
PANEL PERIMETER
Project DETAILS
Location Pacific Northwest
Client. FDE
2x4 FLAT EDGE FRAMING
NAILED TO TRUSS VERTICAL
W/ 16d AT 6" O.C.
1/2" PLY SHTH'G. W/
10d AT 4" 0.C. EDGES
E-- WALL TOP PLATES
16d AT 8" 0.C. FROM BLKG.
PANEL. TO WALL PLATES
C SI- IEAI2UJALL EXTENSION
2X SOLE 12
SEE SCHEDULE
FOR INFO
APA -RATED
.ROOF SHEATHING
BOUNDARY
NAIL (BN.)
2XSOLID
FRIEZE BD.
2 X STUD WALL
(2) -2x OR 4x
(8EE PLAN)
-4OLPQWN DETAIL
20
51— IE4RUJALL EXTENSION
FOR STICK- FRAMED ROOFS
TNAIL 8d AT 3" OC. INTO EACH SHEAR TRUS
By RF
Date 1/2005
Job No 0000
BN.
DBL. JST.
OR BEAK(
L 2 X SOLID BLKG
BELOW ENTIRE LENGTH
OF 844EARWALL.
HOLDOU.N STRAP
(INSTALL WITH
EQUAL LENGTH
TO BEAM AND
8TUD8,
SHEARWALL NAILING
SAME AS BELOW
SOLID BLKG.
SIMPBON 'L680"
MAY SUBSTITUTE
FOR "LTP4"
CLG. JST
ty APA -RATED
SHEATHING
EITHER SHEAR TRANSFER
SYSTEM MAY BE USED.
SHEAR TRUSSES
EACH DESIGNED FOR
DIAPHRAGM SHEAR LOAD
SHOWN ON PLANS
TRUSS TO TRANSFER SHEAR
FROM TOP TO BOTTOM CHORD)
(4) 16d NAILS
2x8 AT 16" 0.C.
W/ (3) 16d EA. END
Sheet No
FASTEN TRUSS TO WALL
SEE "SSHE" CUPS
W/ SEE SCHEDULE FOR SPACING.
1
SHEARWALL
SHEAR TRUSS MAY BE ELIMINATED IF
SHEARWALL EXTENDS UP TO ROOF SHEATHING
NAIL ROOF TO SHEARWALL W/ 8d AT 3" 0.0.
Si-IEAF LUALL EXTENSION
I
t
Designs Engineering, Inc
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
BEAM
2X STUD WALL
STRAP SEE
FLOOR PLAN
4 X 8 POST
8R1P. 'M&TC40"
EA END CP HEADER
FASTEN TO
DBL. STUDS
BOLT DECK LEDGER
TO RIM JOIST W/ 5 43"4
AT 16 O.C. AND 2) ROWS
16d AT 8 O.C.
(USE 2 5/8 BOLTS IF
JOIST SPAN GREATER
THAN IO' -ID'
FLOOR JOIST
I
5' SO X 3/8" BRG PLATE
PEEN THREADS AFTER TIGHTENED
SH
11
1- IOLDOWN ABOVE BEAM
THIS DETAIL ALWAYS APPLIES.
fl FILL CAVITY UV SOLID
I
WOOD AT I•IOLDOLLNS
_i I -DRILL HOLE V8' GREATER M DIA
N CENTER OF BEAM FOR BOLT
DECK LEDGER HANDRAIL CONN.
THIS DETAIL ALUTATB APPLIES.
16d O 6"
MULTIPULE
HOLDOWN STUDS
SEE SCHEDULE
11
CUT 1" X 4" SLOT IN PLY
FLOOR SHTHG FOR STRAP
SIMPSON "H2.5
g EA. SIDE
NOTCH 4X8 FOR 3"
BEAM BEARING
EXTERIOR WALL
4 X 12 BEAM
SIMPSON "PH02" W/
5/8" X 8" EXP BOLT
CONCRETE FTC.
81MP8ON "MTV
WRAP STRAP AROUND
HEADER IF NECESSARY
O SHEARWALL POST CONN.
26
Project Structural Details
Location. Pacific Northwest
Client: FDE
HOLDOUN W/ 436
GRADE THREADED ROD
THEADED ROD
2X LEDGER
SIMPSON ABU•
POST BABE
OR ELEVATED
ERB IP SLAB
THIS DETAIL ALWAYS APPLIES.
DBL. 2X MEMBER OR
4X MEMBER RIM JOIST
1 4 X 3" X 6 X 9'
STEEL ANGLE
II II 7 n n
2X BLKG.
AT STRAP
DOUBLE 2X
JOIST
15ZI -2X6 DIA. BRACE
W/ (2) I6d EA. JOIST
SEAM
PERPENDICULAR WALL
PLYWOOD SHEATHING
OVER WALL STUDS
2X SPACED CEDAR
(6) 16d 2 NAILS AT THE TOP
MIDDLE, 4 BOTTOM
CONNECT WALLS TOGETHER BY FIRE
NAILING END 2x4 TO CHANNEL W/
(S) I6d THEN INSTALL ADDITIONAL
2x4 AGAINST IT AND NAIL W/ (6) 16d
EDGE NAIL (E)4)
TO END 2x4
By RI
Date 2 /2005
Job No 0000
PORCH /DECK POST CONN.
TOENAIL
UNLESS NOTED OTHERWISE,
USE SIMPSON" PC
POST CAP
(USE EPC' AT
ENDS CP BEAM)
PRESSURE TREATED
WOOD POST
/CONCRETE SLAB
CONC. FTG.
BEAM
4 1/2" 4"
ST6224 STRAP WRAP
AROUND BACK OF LEDGER 5/8 THROUGH BOLTS W/ NUTS
4 NAIL TO DIAL. BRACE AND I DIA. X 3/16 WASHERS.
EA. SIDE. 4X6 CEDAR NEWELL
TO RIM JOIST
SHEARUJALL- WALL
CONN.
Sheet No
1
e
EDGE
NAIL
7r e
B E A
3�
����,*�=,*"��*»�w,www~v**w�w�m�w��w***,rr��*v^*p`www,n�ww"`v���"`�w`^wvww*/vvw"=v,IOvxwm"n"=
lOH
PREPARED BY
Client
Project
Location
Date
Calculation By
Comment
sii!i: v.
Suntel Design
Tigard, Oregon
SUNTEL DESIGN
COVENTRY PLAN
GARAGE DR HDR
LM
R1
BEAM AND LOAD DIAGRAM
000���0�������0�0��00����������0�
m�mm�m�mwmwmm�m���m�m�mm��m�mwm�m
R2
Reaction R1 5,000 0 lbs Reaction R2 5,000 0 lbs
Total load 10,000 0 lbs
Dimensions: Clear span 16 0 feet, no overhang
No point loads
No triangular loads
Uniform beam weight= 25 lbs/lf 400 lbs total)
Uniform loads U1 600 0 lbsylf at 0 0 feet to 16 0 feet
Deflection limit (live load plus dead load) 1/240
BEAM TYPE LAM 24 F GLULAM
COMPUTED STRESS/STRAIN DESIGN VAL PROPERTIES REQUIRED ACTUAL
Shear (lbs) 5,00V 0 FV 165 0 Area (Sq In
Moment (ft-lbs) 20,000 0 FB 2,400 0 Sect Modulus
Deflection {in) 0 80 E 1 80E6 Mom Inertia
i
.1' i'
Actual Maximum Deflection 0 80 inches
Maximum Deflection occurs at 8 0 feet
Maximum Moment occurs at 8 0 feet
MINIMUM BEAM SIZE (W x H)
H: i i
NM
MINIMUM BEAM AREA (Sci In 58 62
45
100
639
.���:a�
59
112
639*
BEAM ANALYSIS
����u�����' r��u�*������������
�����������y'��o�*�wowvw���� �www�ww�m»woo«w�xn°wr^w
PREPARED BY Suntel Design
Tigard, Oregon
SUNTEL DESIGN
COVENTRY PLAN
PORCH ROOF BM
Client
Project
Location
Date
Calculation By
Comment
LM
BEAM AND LOAD DIAGRAM
0 00N 0 0�� 0 �0� 0 ��0 00�
m mmm m mmm m mmm m m�m m mm� m mw
R1
R2
Reaction R1 935 0 lbs Reaction R2
Total load 1,870 0 lbs
Dimensions Clear span 11 0 feet, no overhang
935 0 lbs
No point loads
No triangular loads
Uniform beam weight= 20 lbs/lf 220 lbs total)
Uniform loads U1 150 0 lbs/lf at 0 0 feet to 11 0 feet
Deflection limit (live load plus dead load) 1/240
�s. i. th
BEAM TYPE WOOD FIR/LARCH 4X #2
COMPUTED STRESS/STRAIN DESIGN VAL PROPERTIES REQUIRED ACTUAL
Shear (lbs) 935 0 FV
Moment (ft-lbs) 2,571 3 FB
Deflection (in) 0 55 E
:i.
Actual Maximum Deflection 0 25 inches
Maximum Deflection occurs at 5 5 feet
Maximum Moment occurs at 5 5 feet
MINIMUM BEAM SIZE (W x H)
95 0 Area (Sq In
875 0 Sect Modulus
1 60E6 Mom Inertia
MINIMUM BEAM AREA (Sq In 27 21
15
63
27
35*
137
.�i i 1, N �i' :I: Vi
lVH
PREPARED BY
Client
Prcject
Location
Date
CalculatiDn By
Comment
Suntel Design
Tigard, Oregon
SUNTEL DESIGN
COVENTRY PLAN
BEAM AT NOOK
i
BEAM ANAL YSI
BEAM AND LOAD DIAGRAM
00�����0�00��N0��
mmmmm�mmmmmmmmmmm
R1
R:2
Reaction R1 9,600 0 lbs Reartipn R2
Total 1/ad 7,200 0 lbs
Dimensizns Clear span 8 0 feet, no overhang
0,600 0 lbs
l ed=
M triangular lDads
Unifno. 15 lbs/If 120 lbs tctal)
Unif.)rm loads U1 985 0 lbs/lf at U 0 feet to 8 0 feet
Deflecti n limit (live lrad plus dead load) 1/360
BEAM TYPE LAM 24 F GLULAM
COMPUTED STRESS/STRAIN DESIGN VAL PROPERTIES REQUIRED ALTUAL
Shear (lbs) 3,60o o FV 165 Area (Sq In
Moment (ft-lbs) 7,i00 0 FB :,400 Sect M�dulus
Deflectirn (in) 0 7 E 1 80E6 Mom Inertia
Actual Ma imum Deflection 0 27 inches
Ma imum Deflection cccurs at 4 0 feet
Maximum Moment occurs at 4 0 feet
MINIMUM BEAM SIZE (W x H)
MINIMUM BEAM AREA (Sq In 37 83
33
17
38
47
17'*
1
l0H
P lrads P1
No triangular loads
Uniform beam weight=
Uniform loads U1
Deflection limit (live
BEAM ANALYSIS
PREPARED BY Suntel Design
Tigard, Oregon
Client SUNTFL DESICN
pr COVENTRY pLANX-
Location BEAM BTWN NOOP AND kITCH
Date
Calculati/n By L M
Comment
Reacti R1 2,961 7 lbs
Tctal load 4,350 V lbs
Dimensions Clear span
BEAM AND LOAD DIAGRAM
����0��� 0� 00N�0��
mm mmmmmmmm mm mmmmmmm
m
R1
P1
mw
Actual Ma imum Deflection o '10 inches
Maximum Deflection /ccur at 1 0 feet
Maximum Moment occurs at 5 feet
MINIMUM BEAM SIZE (W x H)
UV
)111111
R2
Reacti/n R 1,388 3 lbs
9 0 feet, no cverhang
3,540 0 at 2 5 feet
MINIMUM BEAM AREA (Sq In 36 50
15 lbs/if 135 lbs total)
75 0 lbs/lf at 0 0 feet to 9
load plus dead load) 1/360
o
feet
BEAM TYPE LAM `4 F GLULAM
COMPUTED STRESS/STRAIN DFSIGN VAL PROPERTIES REQUIRED ACTUAL
Shear (lbs) 2,961 7 FV 165 0 Area (qq In 7 36
Moment (ft lbs) 7,1~. 9 FE{ 2,4oU o Sect Modulus 06 43
DeflectiDn (in) 0 30 E 1 8»E6 Mom Inertia 154 151*
ft��pe 7' 1 .2
111:1112C II
1 0H
BEAM ANALYSIS
IIINIIIINIIININIONIVIIIIIININIINNIVINNIIIIIIINIIIIIVIIVINVIIIIIINI
PREPARED BY Suntel Design
Tigard, Oregon
Client SUNTEL DESIGN
Project COVENTRY PLAN
Location: PORCH/DECK BM K1
Date
Calculation By L M
Comment
BEAM AND LOAD DIAGRAM
111111111111111111111111M Hi
111•1111111•11.111■111111110111111111111•11
R1
1
R2
Reaction R1 1,210 0 lbs Reaction R2 1,210 0 lbs
Total load 2,420 0 lbs
Dimensions Clear span 11 0 feet, nO overhang
No point loads
No triangular loads
Uniform beam weight= 20 lbs/lf 220 lbs total)
Uniform loads U1 200 0 lbs/lf at 0 0 feet to 11 0 feet
Deflection limit (live load plus dead load) 1/240
iiiiiiiilliiiiiliiiiill
BEAM TYPE WOOD FIR/LARCH 4X #2
COMPUTED STRESS/STRAIN DESIGN VAL PROPERTIES REQUIRED ACTUAL
Shear (lbs) 1,210 0 FV 95 0 Area (Sq In 19 31
Moment (ft-lbs) 3,327 5 FB 875 0 Sect Modulus 46 46*
Deflection (in) 0 55 E 1 60E6 Mom Inertia 92 202
!PIM: 1' 'hi' t:: 21 322: 222.22 22: ti:11:22:12S, tit :it: :it
Actual Maximum Deflection 0 22 inches
Maximum Deflection occurs at 5 5 feet
Maximum Moment occurs at 5 5 feet
I Hriii; P :illilln: P 11;:i: i i
MINIMUM BEAM SIZE (W x H) 17m."'" nCC km 'ye B. B1-
MINIMUM BEAM AREA (Sq In 30 96