HomeMy WebLinkAbout1108 Cathleen St Technical - BuildingTECHNICAL
Permit °'1 --539
Address 1 1 0g Ccit'l ir, S
Project descriptio n_ \J So 1,
Date the permit was finaled `l 30
Number of technical pages 30
PLAN 63095N
FOR
Suntel Home Design
In return for payment of a one -time fe Architecture Engineering, Inc grants
you a limited license to use the Ana ly is to construct one single house a the address shown
below This lateral analysis is not to a used for any master plan approval process.
Site Location 1108 Cathleen St, Port Angeles, WA. Only
Copyright: 9670
NOTICE If the Building Department accepts the Analysis without an engineer's
original "wet- stamp" seal signed with red ink or for different site location than shown above,
then it is agreed that such Building Department accepts total liability out of or in connection
with this Analysis.
CALCULATIONS, SHEAR SHEET, L- SHEET VALID ONLY WITH
ORIGINAL STAMP HERE AND DIGITAL STAMP ON PLANS
w 122
W
O
OP
AND s. 'E AFTER
CAN NOT rE USED, $'r4 December 2007
5
f)°
Project: Yamhill -N By RF Sheet No
File #63095-N-100D-D2-WA Date. 8/2005
Designs Engineering, Inc. Client: 3untel Home Design Job No 1923 j
LATERAL AALYSIS
LIABILITY LIMITATIONS
ANALYZE BUILDING FOR ONLY WIND SEISMIC FORCES
ac ordi to the
2003 INTERNA1 IONAL BUILDING CODE
WIND ANALYSIS FC R EXPOSURE "D" 100 MPH (3 -sec Gust)
SEISMIC ANA:.,YSIS FOR ZONE D2
g alle/t/ Designs Engineering, "FDE') was retained in a limited capacity for this project. Design is
based upon information provided by the Chen who is solely responsible for accuracy of same No responsibility
and liability is assumed to FDE for items beyc nd that shown on these sheets No construction observations nor
soils investigations performed by FDE.
INDEMNIFICATIONS BY BUILDING !APARTMENT
Building Department agrees to defend, indemr ify and hold harmless FDE from any loss, costs, damage,
expense, including attorney fees upon trial or z ppeal, for liability arising out of or in connection with
FDE's Analysis unless Analysis is used for sn,ctfic site location shown on cover page and contains an
original enameer's "wet stamp" seal signed with red -ink (no photocopy allowed).
OWNERSHIP OF DOCUMENTS
All documents produced by FDE shall remain the property of FDE and shall not be used unless accompanied by at
original engineer's wet -stamp issued from FD1
IRNER
Project. Yamhill N By RF Sheet No
S
File #63095-N 100D-D2-WA Date 8/2005
Designs Engineering, Inc Client: untel Home Design Job No 1923
1-
NM X 4
DRREET ELEV ONLY) Tye
MEDI ID PRE -PNI
PAECIA &UTTER&
A° ICKIP OOP LAP
3A WON ROCK VENEER
'11111111
11111114
ENE EINE
COMPORTION ROOMNI1
11 /"TTCW ADP. OvER PAP PM PAIP;ATNr1
1 1 11 U =1 M
LUH 11M Mil
CJI=11M.
1=11 DD fallEt
SCALE. 1/4. 1
12
0
SCALE: va. P-0"
pirrT4
-Ramo II
`MN I II
116111111111111
101 7__CVA
RERRI EWER
ummateuasnmoussouseasrArake.
sillt,krommum mmmmm In mmmmm asaLe4V),,
w..
swomumanumegmmsast
N or, NNE
E MIR MEE!
M h MEM
4NA DP COL. 111/ TAPERED
CEDAR OOP 10/ 34 11614
ROCK DAM
-OT
LINE
Designs Engineering, Inc
NO FLOOR
L INE
1ST FLOOR
LINE
.10
IP
EINEMINEEMINIVASEINNIESSISIffmatk
Project. Yamhill-N By RF Sheet No
Client: 1 ,untel Home Design job No 1923
File #6 3095-N-100D-D2-WA Date 8/2005 3/
t 15
IN G OVER
15 A.S.F. 0 PAU SPEATI-IING
C7LQ tVA
SCALE. VS"
12
12
51PITC1-1
SCALE VS" P"
VA CD
li==e
Designs Engineering, Inc
/c\
1 I 1
Project. Yamhill N
File #6 :;095 -N 100D -D2 -WA
Client. Suntel Home Design
EXTEND WALL SHTHG
DOWN TO FLOOR
By RF
Date 8/2005
Job No 1923
FASTEN EA. TRUSS TO TOP
WALL PLATE W/ SIMP '1-16
4 EA. STUD TO TOP WALL
WI SIMP 'SP2
SPACE ROOF SHTHG FASTENERS AT 6 O.G. AT ALL INTERMEDIATE
FRAMING MEMBERS EACH SIDE OF EACH RIDGE, HIP AND WITHIN
A 5 -(D' WIDE NAILIN s ZONE AROUNr THE ENTIRE PERIMETER OF
THE HOUSE (NAILING!! ZONE WIDTH St ARTS AT EDGE OF ROOF)
18 1
Sheet No
-4/
Project. Yamhill-N By RF
File #(3095-I\t-100D-D2-WA Date 8/2005
Designs Eng Inc
Client: Suntel Home Design Job No 1923
L. TOP WALL,.
PLATES 4 SOLI
BLOCKING
(MILL) 30'
1.1.1AILL
WIDTHS
(TYPICAL)--,---
V
c
1 11:, 11 1
F I_511,:d4111,11■11,1
1
FASTEN STRAP TO
BEAM
-4-
Ili I
riN us "1-1,,%0E1) AREA
SPEC
SE
CWE 1ULE
--1i
L__C
0.Eit
.1
i ;Iowa--
DETAIL IB----
EXTEND 1-LEADER C vER ENDLUALLS
Sheet No
i
r1/\
Designs Engineering, Inc
L
Project Yamhill-N
File #63095-N-100D-D2-WA
Client. Si intel Home Design
SEE DETAIL
EXTEND HEADER OVER ENOUJALLS
illiMaawarAzarate.waune.r.mswx.
L
By RF
Date 8/2005
Job No 1923
r
CI''-
Sheet No
ey
ONLY (I) HD
REO'D AT
CORNERS
SEE G
Designs Engineering, Inc
Project. Yam lull -N By RF Sheet' No
File #63 +)95- N- 100D -D2 -WA Date 8/2005
Client: S; 7 Intel Home Design Job No 1923 1
WIND ANALYSIS USING 2003 IBC SIMPLIFIED WIND METHOD
Data.
W Total Wind Force Y x Ix P x A
Y• =161 I =10
FRONT REAR WALLS
SIDE WALLS
Reference 2003 IBC Figure 1609 6.2.1
Zone Horizontal Pressure Projected Area
A Pa 17 8 psf Aa 90 sq ft.
B Pb 12.2 psf Ab 20 sq ft.
C Pc 14.2 psf Ac 750 sq ft.
D Pd 9 8 psf Ad 90 sq ft.
W Y I (Pa Aa Pb.Ab Pc A:: Pd Ad) W 2 15 x 10 pounds
Distribute wind force to roof an i second -floor level
FRw1 YI(015PaAa +10 Pb.Ab +015 Pc Ac +10PdAd) FRw1 477x10 lbs
F2w1 Y I (0 85 Pa Aa 1 0 PI-Ab 0 85 Pc Ac 1 0 Pd Ad) F2w1 1 86 x 10 lbs
Zone Horizontal Pressure Projected Area
A Pa 17 8 psf Aa 90 sq ft.
B Pb 12.2 psf Ab 30 sq ft.
C Pc 14.2 psf Ac 540 sq ft.
D Pd 9 8 psf Ad 220 sq ft.
W Y I (Pa Aa Pb.Ab Pc A Pd Ad) W 1 9 x 10 pounds
Distribute wind force to roof and second -floor level
FRw2 Y I (0 3 Pa Aa 1 0 Pb Ab 0.3 Pc Ac 1 0.Pd Ad) FRw2 8.54 x 10 lbs
F2w2 Y I (0 7 Pa Aa 0 0 Pb. Ab 0 7 Pc Ac 0 0 Pd Ad) F2w2 1 04 x 10 lbs
0 Project: Yamlull -N By RF Sheet No
File #63 )95- N- 100D- D2 -WA Date 8/2005
Designs Engineering, Inc Client: Si intel Home Desi gn Job No 1923
SEISMIC ANALYSIS USING 2003 IBC SIMPLIFIED ANALYSIS PROCEDURE
Data. I =1 0 Sd 1 30 R 15 5 r 0 45 (worst case)
E Earthquake Base Shear 1.2 p Qe 1 4 1.2 p (Sd W/ 1 4R)
Weights
Mass Calculations
Roof Dead Load 15 psf (Composition Roof Covering)
Floor Dead Load 10 psf
Partitions 10 psf
Exterior Walls Windows 10 psf (Average)
Aroof 1200 ft ^2
A2ndFloor 1000 ft^2
AlstFloor 1600 ft ^2
h2 21 ft
Mroof 20•Aroof 10•Aioofwall
M2 20•A2ndFloor 10•I.2wall
p 2
20
r..\/ A2ndFloor
E 1.2 p. Sd (Mroof M2) E 1.11 x 10 pounds
1 4•R
Distribute Seismic Shears
D Mroof h2 M2 hl
Aroofwall 700ft ^2
A2wall 1400 ft^2
Al wall 0 ft ^2
hl• =10ft
Mroof 3 1 x 10 pounds
M2 3 4 x 10 pounds
p if (p l l p) p 1
D 9 91 x 10
Mroof h2
FRe D E FRe 7 32 x 10 pounds
M2 hl
F2e D E F2e 3 82 x 10 pounds
Designs Engineering, Inc
Project Yamlull -N
File #63 )95- N- 100D -D2 -WA
Client Sithtel Home Design
By RF
Date 8/2005
Job No 1923
Sheet No
'il 5
INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH
Analyze entire brace wall line as a series of r erforated shearwall panels using worst -case "maximum opening
height ratio Individual perforated shearwall panels extend between plan discontinuity Overturning for such
panel is calculated by rational analysis. Reference Section 2305 3 7.2 2003IBC
Unadjusted in-plane shear force for brace wall line, FRe 2950#
Percent full height sheathing 8 ft. .6 ft 50%
Maximum opening height ratio 4ft 8 ft 0 50
Shear resistance adjustment factor, Co 0 8 (Ref Shear resistance adjustment factor table)
Amplified in-plane shear, V Unadiusted shear force for brace wall line
Shear re sistance adjustment factor x Total length of full height walls
FRe /(CoxL)= 2950# (0 8 x 8 ft) 460 plf
Uplift at perforated shearwall ends call;ulated based on rational analysis (use only 50% of weight
of first individual full height wall segment for dead load)
2/3 average weight of full heig it wall segments and portion of roof framing, Wd 110 plf
2/3 dead -load reaction at end o shearwall or corner restraint, R1 400#
Uplift at end of perforated shearwalls, Pu Vf x hl Wd x (0 5 L1) R1
460 plf x 8 ft 110 plf x (0 5 x 4 ft) R1 3100#
Uplift between wall ends, t 1 1- Wd 460 plf 110 plf 350 plf
Wall bottom plate (1 1/2" thickness) tc rim joist.
Use 16d common nails (0 162 3 1/2 inches)
Lateral resistance 1 33 x 1414 187# per nail
Withdrawal resistance 1 33 x 40 ph x 2.5" 133# per nail.
Nails for shear transfer 460 plf 187# per nail 2.4 nails per foot
Nails for uplift transfer (460 -110 plf) 133# per nail 2 6 nails per foot
Net spacing for shear and uphf. 2.4" o c
Rim joist to wall top plate
Use 16d common nail (0 162 b y 3 1/2 in.) toe nailed to provide shear transfer
Lateral resistance 0 83 x 187,1 per nail x 1 5 nails per ft. 230 plf (150# per nail default maximum:
for seismic loads) plus Simpso :i "LTP5" framing clip capacity 630#
Net spacing for shear using LTP5 clip and 16d toenails at 8" o c 630# (460- 150 24" o c
Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor
wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced
moments and shears Continuity of lead path is provided by holdowns at ends of the perforated shear wall.
Use Tyne "C" shearwall w/ HTT22 ho downs, 16d at 2 1/2" o.c. sole plate nailing and LTP5 clips at 24" o.c
Designs Engineering, Inc.
RI 400°
FRe 2950"
I- IOLDOWN
Pu 3100"
S
4 -0'
P.S.W. Segment
ELEV4TIO
N
WALL HEIGHT
8' -0'
Percent Full- lleight Sheathing
10%e
20%
30%
40%
50%
600
10%
90%
Project YamhillN
File #63095- N- 100D -D2 -WA
Client ;iuntel Home Design
R -0'
OF PERFORATED S
By RF
Date 8/2005
Job No 1923
4 -0'
P.S.W. Segment
Perforated Shear Wall
-4E4RW4LL
MAXIMUM OPENING HEIGHT RATIO AND HEIGHT
14.3 1-1/2 214/3 214/6 H
2' 5' 4/-0' 5 -4 6 -8' 8' -0'
Shear Resistance AdJuetment Factor
L0 0.69 033 043 036
1.0 611 o.56 0 45 0.38
I.0 014 059 049 0 42
10 011 0.63 0.53 0 45
1.0 0.80 0b1 0.51 0.50
1.0 0.83 011 0.63 0.56
1.0 0.81 011 0b9 0.63
1.0 0.81 0.83 I 011 011
EAR RESIST/4\ICE 4DJUSTINIENT FACTOR
Sheet No
1 i 5
Designs Engmeermg, Inc.
INVESTIGATE UPPER -FLOOR SHEARWi LLS.
Line "A"
Rear Walls
Line "B"
Front Walls
Project: Yamhill =N
File #63095- N- 100D -D2 -WA
Client: ;lintel Home Design
Summation of fill- height walls lengths L 15 ft.
Total length of brace wall line TL 38 ft.
full- height sheathing S L 100 S 39 47 percent
TL
Diaghragm stress v 0 5 FR v 96.31 plf
TL
Shearwall stress v 0 5 FR v 304 99 plf
Weight Wd 110 plf
R1 400
08L
Uplift for shear vall length L 1 3 ft.
(worst case)
Pu• =v8— 5WdLl —Rl
Use Tyne "B" S learwall w/ MSTC40 holdowns
Summation of f Ill- height walls lengths L 20 ft.
Total length of brace wall line TL 34 ft.
full height sheathing S L 100 S 58 82 percent
TL
Diaghragm stre: s v 0 5 FR v 107 65 plf
TL
Uplift for shearvall length L1 3 ft.
R1 400
(worst case)
Pu v 8 5 Wd L1 Rl Pu 296 16 pounds
Use Type "B" S riearwall w/ MSTC52 holdowns
Uplift for shear vall length L 1 15 ft.
(worst case)
Pu•= v8— .5WdLl —R1
Use Type "B" S h.earwall w/ no holdowns
By RF
Date 8/2005
Job No 1923
Pu 1 87 x 10 pounds
Sheet No
Il I4,
Weight Wd 110 plf
Weight Wd 110 plf
Rl 400
Pu —363 84 pounds
Designs Engineering, Inc.
INVESTIGATE UPPER -FLOOR SHEARWt? LLS.
Line 1 Walls
Line 2 Walls
Project Yamhill -N
File #63095- N- 100D -D2 WA
Client: Suntel Home Design
Summation of fill- height walls lengths L 15 ft.
Total length of brace wall line TL 24 ft.
full- height sheathing S L 100 S 62.5 percent
TL
Diaghragm stres v 0 5 FR v 177 87 plf
TL
Shearwall stress v 0 5
FR
0 78 L
Uplift for shearwall length L1 8 ft.
(worst case)
Pu =v8— 5 —R1
Use Tyne "C" S .earwall w/ MSTC52 holdowns
Summation of hill- height walls lengths L 20 f1:.
Total length of brace wall line TL 23 ft.
full- height sheathing S L 100 S 86 96 percent
TL
Diaghragm stres v 0 5 FR v 185 6 plf
TL
FR
Shearwall stress v 0 5
08L
Uplift for shearwall length L1 3 ft.
(worst case)
Pu =v8— 5 —R1
Use Tyne "C" S .earwall w/ MSTC52 holdowns
By RF
Date 8/2005
Job No 1923
v 364 86 plf
Weight Wd 110 plf
Rl 400
Pu 2.08 x 10 pounds
Sheet No
I a/
v 266 81 plf
Weight Wd 110 plf
R1 400
Pu 1 57 x 10 pounds
Designs Engineering, Inc
INVESTIGATE LOWER-FLOOR SI.-IEARV6ALLS._
Rear Walls
Line A
Front Walls
Line B
Project: Yamhill -N
File #(3095- N- 100D -D2 WA
Client: Suntel Home Design
Summation of full- 1eight walls lengths
Total length of brace wall line
full- height sheathing S L 100
TL
F2w1
Diaghragm stress v 0.3
Rini/blocking sties: v
Shearwall stress v
TL
0 5 FRw1 0.35 F2w1
TL
0.5 FRw2 0.35 F2w2
L
Uplift for shearwall length L1 2 ft.
(worst case)
Pu• =v9— 5WdL1 —Rl
Type "U" Shearwal. w/ HTT22 holdowns
Summation of full Height walls lengths
Total length of brace wall line
full height sheatl mg S TL 100
F2w1
Diaghragm stress v 0 3
TL
0 5 FRwl 0 5 F2w1
TL
1 1 (0 5 FRe 0 5 F2e)
Rim/blocking stress v
Seismic Shearwall
stress w/ wall aspec v
ratio penalty
Shearwall stress
v
L
L
0 5 FRe 0.5 F2e
Uplift for shearwall length LI 2 ft.
(worst case)
Pu v 9 5 Wd Ll R1
Use Type "D" Shear wall w/ HTT22 holdowns
By RF
Date 8/2005
Job No 1923
L•= 16 ft.
TL 39 ft.
S 41 03 percent
v 142.92 plf
Sheet No
IS/ l5
v 227 92 plf
v 495.34 plf
Weight Wd 110 plf
Rl 400
Pu 3 95 x 10 pounds
L 18 ft.
TL 21 ft.
S 85 71 percent
v 265 42 plf
v 555 99 pif
v 340 48 plf
v 309 52 plf
Weight Wd 110 plf
R1 400
Pu 2.28 x 10 pounds
Designs Engineering, Inc
INVESTIGATE LOWER -FLOOR SHEAR. ALLS.
Project: Yamhill -N
File 3095- N- 100D -D2 -WA
Client: Suntel Home Design
Garage Summation of full leight walls lengths L 3 7 ft.
Front Walls Total length of brace wall line TL 20 ft.
Line C
full- height sheathing S TL 100 S 18 5 percent
F2w1
Diaghragm. stress v 0.3 TL v 278 7 plf
0 15 F2w1
Rim/blocking stres.' v TL v 139 35 plf
Seismic Shearwall 1 75 0.2 F2e
v L v 361 63 plf
stress w/ wall aspect
ratio penalty
0.2 F2w2
Shearwall stress v v 564 72 plf
L
Uplift for shearwall length L1 2 ft.
(worst case)
Pu v 9 .5 Wd L1 R1
Use Garage Frame Detail
By RF
Date 8/2005
Job No 1923
Sheet No
71 '5
Weight Wd 110 plf
Rl 400
Pu 4 57 x 10 pounds
Designs Engineering, Inc.
INVESTIGATE LOWER FLOOR SHEARWALLS..
Line 1
Line 2
Project: Yanihill -N
File #03095- N- 100D -D2 -WA
Client. Suntel Home Design
Summation of full- height walls lengths L 32 ft.
Total length oi'brace wall line TL 43 ft.
full- height heathing S L 100 S 74 42 percent
TL
F2w2
Diaghragm stress v 0.25 v 60 74 plf
TL
0 5 FRw2 0 5 F2w2
Rim/blocking .,tress v TL v 220 76 plf
Shearwall stre! ;s
Uplift for shea-wall length L1 7 ft.
(worst case)
Pu v 9 5 Wd Ll Rl
Tyne "C" Shearwalls w/ HTT22 holdowns
Summation of full height walls lengths L 18 ft.
Total length of brace wall line TL 22 ft.
full- height s aeathing S L 100 S 81 82 percent
TL
F2w2
Diaghragm stress v 0 25 v 118 72 plf
TL
0 5 FRw2 0 5 F2w2
TL
Rini/blocking tress v
Shearwall stress v
0 5 FRw2 0 5 F2w2
v L
Uplift for sheaiwall length L1 3
(worst case)
Pu =v9— 5•WdLl —R1
0 5 FRw2 0 5 F2w2
L
Type "D" Shearwalls w/ HTT22 holdowns
By RF
Date 8/2005
Job No 1923
ft
Sheet No
v 296 64 pif
Weight Wd 110 plf
Rl 400
Pu 1 88 x 10 pounds
v 431 48 plf
v 527 36 plf
Weight Wd 110 pif
R1 400
Pu 4 18 x 10 pounds
Architecture Engineering, Inc
a
0
a
0
fl
IC)
Project. Structural Notes
Location Pacific Northwest
Copyright 1993
OWNERSHIP OF DOCUMENTS
By RF
Date 1/2007
Job No 7000
The "diamond" shearwall designation system details were created by
Fuller Architecture Engineering, Inc (FAE) and are copyright protected
property of FAE and shall not be used unless issued from FAE
Copyright 1993
LEGEND
1
0
DRAWING NOTES
'SIMSPON 'HU" TYPE BEAM HANGER
SIMPSON "GLB' TYPE BEAM HANGER
DESIGNATES GRID LINE
DESIGNATES DETAIL MARK
C DESIGNATES SHEARWALL TYPE
6 DESIGNATES HOLDOWN TYPE
�.T (SEE SHEAR SCHEDULE)
PERFORATED SHEARWALL
SEE DETAIL #30
DESIGNATES DRAWING NOTE
DESIGNATES H.D. LOCATION (APPROXIMATE)
SIMSPON 'HUxx TYPE BEAM HANGER
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'EPC' TYPE POST CAP
DESIGNATES 6X DFL #1 POST W/ SIMPSON "ECC' TYPE POST CAP
(3) 2 x (WALL WIDTH) BUNDLED STUDS TO SUPPORT ROOF FRAMING ABOVE.
SIMPSON 'MSTC52' FASTENED TO DBL. JOISTS OR BEAM. SEE DETAIL 6
DOUBLE FLOOR JOISTS. NAIL FLOOR SHEATHING TO EACH JOIST WITH (2) ROWS
10d COMMON NAILS AT 6' O.C.
A 'DRAG SHEAR TRUSS' DESIGN TRUSS FOR 150 PLF DIAPHRAGM SHEAR
TRANFERRED FROM TOP TO BOTTOM CHORDS THROUGH THE WEB MEBERS WITH CUMULATIVE
FORCE RESISTED AT ONE END OF THE BOTTOM CHORD.
(2) STUDS UNDER BEAM CONTINUOUS DOWN TO FOUNDATION.
Sheet No
Architecture Engineering, Inc
SHEARWALL SCHEDULE
MARK. WALL COVER FASTENERS PANEL
K
EDGES
I6GA STAPL
RATED SHT'G 0.131 x 2
0.148'4 x 2
1/16 A.PA.
RATED SHT'G
EACH SIDE
7/16 A.P.A.
RATED SHT'G
EACH SIDE
NOLDOWN SCHEDULE
'X" DESIGNATES SIMPSON PRODUCT
MARK' HOLDOWN I FASTENERS
NO
HOLDOWN
REQUIRED
"MSTC40' (18) I6d SINKER
1 NAILS AT EACH END
\3/ MSTG66 (34) I6d SINKER
NAILS AT EACH END
\4/ 9 0 "LONG NAILS AT EACH END
6d WALLBD
5/S G.W.B. NAIL OR 1
W" 0 6 SCREW
0.1454'X2
ULL ROUND-
EAD P -NAIL,
0.145 m x 2
ULL ROUND-
EAD P -NAIL
MSTG52 (24) 16d SINKER
NAILS AT EACH END
"CMSTI2 (43) I6d SINKER
"PHD 5
-OR
'HDU -4
'HTT22
OR
"HDU -5
1 P1-1D6
SIMPSON '55T524
SIMPSON 'SST524
SIMPSON '55T528
DESIGNATES SHEAR PANEL
AND HOLDOWN TYPE.
4" 0.c 4" 0.0 1Scl Soc
3 O.G.
4" O.0
6" O.C.
A.P.A.- 0.131 4' x 2 3 O.G.
RATED SHT'G 0.145 "d' x 2
F RH. P -NAIL
IAN 1/16" A.PA.- 0.145 x 2 3 D.G
RATED SHT'G ULL ROUND- STAGRD
EAD F
STAGRD
O.C.
2" O.G.
STAGRD
'HDU 8
-OR SIMPSON 'SSTB28
'HDQ -S"
(15)(16) SIMPSON "SSTB28"
'HDU II' or W/ 5/64 CUT WASHER
'HHDQII" 4 HEAVY HEX NUT
(15)(16) 1" DIA. (A35) GALV
"HHDQ14" ROD EMBED 8 INTO
12 MIK. x 21" WIDE
10' 0' LONG FTG.
0 DESIGNATES APPROXIMATE
IHOLDOWN LOCATION
Project. Structural Details
Location Pacific Northwest
Copyright 1993
INTERM, SOLE (9) BLOCKING/ (9) %"4 x 1'
STUDS PLATE RIM JOIST EMB ABG
60.C 1 I6de 31/2 00
12 O.0 STAGRD
12" O.C. 16d's 21/2 oc
4" CC STAGRD
12" O.C. I6dm 31/2 oc
STAGRD
12" O.G 16th+ 2 oc
STAGRD
12 O.G. 16d€ 11/2 oc
STAGRD
NOTES
I6d TOENAILS
45" O.0
48" O.G.
IS" O.C.
10" O.C.
(3)
"LTP5 m 10' oc 15" O.C.
12 O.0
AT 8 O.0
(3)
"LTP5 "1D 48 oc
11/2 LONG x 1/16 WIDE
STAPLES W/ CROWNS
PARALLEL W/ FRAM'G.
DBL. STUDS /BLKG. AT (5)
ADJOINING PANEL EDGES
W/ I6d AT 4" O.0
DBL. STUDS/BLKG. AT (5)
ADJOINING PANEL EDGES
W/ 1661 AT 4 O.0
DBL. STUDS/BLKG, (5)(11)
ADJOIN'G PANEL EDGES
W/ I6d AT 4 4 3X MUDSILL
3X. MUDSILL AND (8)(11)
3X. STUDS /BLKG. AT
ADJOINING PANEL EDGES
PER NEW CODE, ALL ANCHOR BOLTS MUST
HAVE 2 SQUARE X 3/16 HDG PLATE WASHERS
(3)
"LTP5 "'s 24" oc
(3)
'LTP5 "w 16" oc
(3)
'LTPS'm 6 oc
By RF
Date 1/2007
Job No 7000
Sheet No
Aez
ALL PANEL EDGES
MUST BE BLOCKED
REMARKS
1. ALL FASTENERS USED AT THE COAST AND IN CONTACT WITH PRESSURE
TREATED MATERIAL MUST BE HOT DIPPED GALVANIZED (HDG)
2. "F RH. P -NAIL DESIGNATES A FULL ROUND HEAD PNEUMATIC- DRIVEN
NAIL (10d GALV BOX NAILS MAY SUBSTITUTE FOR 0.1454 P- NAILS)
3 SIMPSON 'RBC BOUNDARY CLIPS TO SUBSTITUTE FOR 'LTP5 AT ROOF
4 SHEATHING ON SHEARWALLS MUST EXTEND DOWN TO SOLE 4 MUDSILL
PLATES AND SHALL NOT BE INTERRUPTED BY ANY WALL BUTTING INTO
THE SHEARWALL.
5 PROVIDE DOUBLE STUDS /BLKG. W/ I6d AT 4" O.G. AT ADJOINING PANEL
EDGES TO AVOID SPLITTING, NAIL EACH PANEL EDGE TO ONLY ONE 2X.
6 'SIMPSON" PRODUCTS SHALL BE INSTALLED AS PER MFG. SPECS
1. HOLDOWNS OCCUR AT ENDS OF SHEAR WALLS AND SHALL FASTEN
TO A MINIMUM OF (2) STUDS (MIN.) LAMINATED TOGETHER W/ 16d AT 6 "o.c.
8 USE LONGER FDN. BOLTS WITH 3X MUDSILL AND SET BOLTS HIGHER.
DO NOT INSTALL FDN. VENT WITHIN 12 CLR. OF A HOLDOWN ANCHOR BOLT
9. FASTENERS SPACING APPLIES ONLY AT FULL HEIGHT WALL SEGEMENTS
OTHERWISE USE MINIMUM CONSTRUCTION STANDARDS
10 ANCHORS SHALL HAVE MIN 13/4 EDGE DISTANCE 4 5 END DISTANCE.
II. WALLS WITH PLYWOOD ON EACH SIDE SHALL OFFSET PLYWOOD EDGE
JOINTS ON ONE SIDE OF THE SHEARWALL FROM THOSE ON THE OTHER.
EXTEND PLYWOOD THROUGH CORNER AS SHOWN IN DETAIL 14 TO
ACHIEVE MINIMUM SHEARWALL WIDTH SHOWN ON PLANS
12 SHEARWALLS WITH OVERDRIVEN NAILS PENETRATING SURFACE BY MORE
THAN I/8 WILL BE REQUIRED TO SE RENAILED USE A RUBBER
GROMMET IN HEAD OF NAIL -GUN AND ADJUST AIR PRESSURE SO NAIL
HEADS ARE FLUSH WITH OR SLIGHTLY RECESSED INTO SHEATHING.
13 ALL STUD WALLS MUST HAVE DOUBLE TOP PLATES W/ lad AT 8 O.0
AND STUDS IS o.c. PLATES SHALL LAP A MINIMUM 4 -0' AT SPLICES
WITH AT LEAST EIGHT 16d NAILS EACH SIDE OF SPLICE
14 HOLDOWN TYPES W/ GREATER NUMERICAL DESIGNATION MAY
SUBSTITUTE FOR HOLDOWNS WITH LESSER 5EE CHART TO THE LEFT
15 USE 3000 PSI CONCRETE IN STEMWALL. PROVIDE (2) CONT T 4 5
IN STEMWALLS WITH THESE HOLDOWNS EXTEND 10' -0" PAST HOLDOWNS
16 FASTEN TO (4) 2x6 FULL HGT STUDS FASTEN EACH STUD TOGETHER W/
(2) ROWS I6d AT 6 0.0 STAGGERED EDGE NAIL WALL PLY TO EA. STUD
IN SHADED AREAS FASTEN SHTHG. AT 4 O.G. AT BOUNDARIES OF
SHADED AREA AND PANEL EDGES BLOCK PANEL EDGES W/ 2
NOMINAL FLAT BLOCKING. USE ad COMMON NAILS FOR ROOFAND
10d AT FLOORS /CLGS USE 5/S 055 OR PLY 51TI -IG. AT CEILINGS
REFERENCES TO SEE NOTES ABOVE
1-12-01
Architecture Engineering, Inc
BOUNDARY
NAIL (BN.)
2XSOLID
FRIEZE BD
2 X STUD WALL
O
SIMPSON 'LTPS'
SEE SCHEDULE
FOR SPACING
SHEARWALL
EXTEND WALL
SHTHG DOWN
TO TOP WALL
PLATE 4 EN.
SEE NOTE
BELOW
APA -RATED
ROOF SHEATHING
EDGE NAIL (EN)
PLY. SPLICE PT
EDGE NAILING
SIMPSON 'LTPS'
RECOMMEND
USING 'DRY'
LUMBER RIM
JOIST OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
ROOF FE IMETER
THIS DETAIL ALWAYS APPLIES.
lOd m 4 O.G.
10d m 4 O.C.
THIS DETAIL ALWAYS APPLIES.
SIMPSON '1-11' TIE AT
EACH RAFTER ALONG
ENTIRE PERIMETER
NOTE. 'HI0 -2' MAY
SUBSTITUTE FOR 'HI'
NOTE. SIMP 'H2.5' MAY
SUBSTITUTE FOR 'HI' AS
LONG AS 'RBC' CLIPS AT
24 o.c. ARE USED TO
CONNECT THE FRIEZE BD
TO TOP WALL PLATE.
PLYWOOD
DECK 51-1EATHING
JOIST
1
[--2 X BLOCK'G
EA. SIDE 48'
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS'
II
Th JOIST /SI- IEAW,4LL
APA -RATED
SHEATHING
SOLE PLATE
7 NAILING SEE
SGHDE FOR INFO
(4) IOd EA. BLK.
FLOOR JOISTS
2 X BLOCKING AT
6 -0' 0.CW /(3)I0d
TOENAILS TO PLATE
2 X STUD WALL
APA -RATED
SHEATHING
1=4R4LLEL JOISTS
Project: Structural Details
Location. Pacific Northwest
Q Copyright 1993
APA -RATED
ROOF SHEATHING
Sol 4 O.G.
2 X 6 FLAT BLK'G
W /I6d 4 O.G.
INTO WALL re
C
SHEARWALL
PLYWOOD
SHEATHING
1Od 4 O.G.
16d 8 "o.e.—
SOLID BLK'G.
SIMPSON 'LTPS"
SEE SCHEDULE
FOR SPACING
By RI-
Date 1/2007
Job No 7000
2 X SOLID BLKG.
WI SIMPSON 'LS50'
EN.
2' —1/2' SHTHG WI I0d AT 4 O.C.
EDGES, BLOCK EDGES.
SEE SI-I WALL SCHEDULE
FOR ADDITIONAL INFO.
2X BLKG. W/
16d AT 6 O.C.
2 X STUD WALL
STRUCTURAL CE I L INCA
JOIST /S1- 1EARUJALL
10d 6 O.C. AT FLOOR
AT DSCR, PROVIDE 2x4
x 5 -0' LONG NAILED TO
BOTTOM CHORD WI 16d AT
4 O.C. STAGGERRED
PREDRILL HOLES FOR
CONNECTOR SCREWS
END OF
2X WALL
END OF 2x4
4 DRAG STRUT
T
RAFTER OR
TRUSS —EN.
FLOOR
1
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS'
JOIST
/r
Sheet No
A- S
SOLID BLK'G.
SHEARWALL
APA -RATED
SHEATHING
SOLID BLKG
EA. SIDE 5 -0'
AWAY FROM END
OF DRAG STRUT
1 I
DRACz STRUT
BM.
CONNECTOR SEE PLAN
FOR SIZE. INSTALL W/
EQUAL LENGTH TO DRAG
STRUT AND WALL.
Architecture Engineering. Inc
49-
SOLE PLATE
NAILING SEE
SCHEDULE
FLOOR J /'1
FRAMING I�
•4 CONT I4ORIZ. •1
AT TOP 4 BOTTOM 11
11 •4 DOWELS 48 O.C.
11 "i (MINIMUM)
CONC. STEM WALL
THIS DETAIL ALWAYS APPLIES.
EDGE NAIL SIDE WALL
SHTH'G TO 4x6 STUD 4' -0"
(12) I6d-
1,
T/F ,rN WALL
BE T
PROV DE IS" HK—
ATEN'OF
WALL 3EINF
T/FTT. .r u i
I
r
NORMAL JOISTS
SIMPSON 'T1STC28
EA. SIDE (4- TOTAL)
L !MIN. PLY WIDTH! L
EA. SIDE I' 10'
I
1
I
4PA RATED
51-1EATHING FASTENED
TO MUDSILL PLATE
EDGE NAIL (EN)
SIMPSON 'LS50' ANCI•IOR
(NOT REQ'D IF 51-1T1-1'G
EXTENDS CONT TO MUDSILL
W /OUT ANY JOINTS)
EDGE NAIL (EN)
IN, "0 x 1" EMS. AB'•
W/2 X2 X3/16
PLATE WASHERS OR
SIMP 'BP 5/8 -2"
Project Structural Details
Location Pacific Northwest
Copyright 1993
NAIL SHEATHING TO
HEADER WI 0.148 "0 x
2 F RH. P -NAILS
3 O.G. BOTH WAYS
4x6 STUD EA. END
W/ ADD'L 2X NAILER
i m CORNER W/ lbd 6
CIARACsE
1 /1 APA -RATED SHTH'G
FROM A SINGLE SHEET
BOTH SIDES W/ 0)48 "0
F RI-I. P -NAILS INTO
4x6 W/ (2) ROWS AT 2' oc.
EXTEND PLYWD THRU
CORNER SEE DET 14
6X SOLID BLOCKING
AT SHEATHING SPLICE
SIMPSON 'P1-1D6
4x6 PLATES W/ (2) 5 /8 "OXI2"
J -BOLTS AT 5' o.c. W/
SIMP BP%S' WASHERS
(2) ROWS OF NAILS AT I 1/2"
STAGGERED TO MUDSILL
SIMPSON 'LTP4 EA. END'
'4 I IAIRPN BAR x 1 4
8" CONCRETE WALL W/
(2) "4 DOWELS EA. END
UNDER SHEARWALL
(2)'4 X 1
NOTE
EXTEND GARAGE
DOOR HEADER
OVER ENDWALL.
HEADER WIDTH TO
MATCH WALL WIDTH
12" SQ. CONT FIG.
W/ (2)•4TI S
24 x 45 "X12" FIG.
4' -O" y WI (3) 0 4 CENTERED
BELOW RAISED STEMWALL
C GARAGE —FRAME DETAIL,
2 -3 n
(4) 10d a 3" O.C.—
PLYWOOD
DECK SHEATHING
ci
II
IF FLOOR JOIST
SYSTEM, PROVIDE
2 X BLOCKING
12 OC. WI (3)
10d TOENAILS
TO PLATE
'R
11 1— •4 DOWELS 48 O.G.
CONC. STEM WALL
IIy RF
Date 1/2007
Job No 7000
1 r
II
2
11
I 11 i i
Ir'
I I
PARALLEL JO ISTS
THIS DETAIL ALWAYS APPLIES.
PONYWALLS 4' -0' AND TALLER MUST BE
APPROVE BY ENGINEER. OTHERWISE: OK
CI I
i
I1
u J 1
TT'rl 1 �rt
I� I'
:PpNYWALL TO'J i VE
"4' SHEA ALL
REQUIREMENTS
11
1f.
1 1
I.
:I
---APA RATED
SHEATHING.
Sheet No
SOLE PLATE
NAILING
EDGE NAIL (EN)
SIMPSON "LS50" AT
SAME SPACING AS 'LTPS
EDGE NAIL (EN)
•4 CONT HORIZ T I 5
x 1" EMS, AB'e
W/ 2 X 2 X 3/16
PLATE WASHERS OR
SIMP 'BP 5/8 -2'
MIN. (2) 2X6 STUDS AT
HOLDOUTS EDGE
NAIL PLY TO STUDS
PROVIDE SOLID WOOD
HOLDOWN STUDS
SIMPSON
INOLDOW'N
436 THREADED
ROD WITH SAME
DI TER AS
ANC OR BOLT
SIMPSON 'CNW" COUF'_ER
II1111
II 'II p
(I• it ll
11 m4 CONT
.(MINIMUM)
II CONCRETE FOUNDATION 1L
I."..'�' -b .rte T
•4 DOWELS m 48" OL.
IOLDOUJN e PONN'UJALL
Il l'
I
:II 1111
8IHP8cN BOLT
II 1 11 1
II hn'
II.
'll
II
Architecture Engineering, Inc.
WALL
SHEATHING
EDGE NAIL
SHEATHING
EDGE NAIL
PLY TO
HOLDOILN
STUDS
IF BEAM IS
UPTURNED USE
2x6 LEDGER
WI I6d AT6 "oe
STAGG'RD.
SIMPSON 'LTPS" 1
SEE SCHEDULE
FOR SPACING
2 X STUD WALL
APA -RATED
WALL SHEATHING
CANTILEVER JST
11 p I •(,A36) THREADED ROD
II W/. SIMPSQM. !SET! ADHESIVE.
11 (SPECIAL.INSPECTION
(I REQUIRED .B'1 CODE)
:If
11 CONCRETE FOUNDATION
RUN PLY.
GON7 TO
BOTTOM E
(2) -2X6
BLOCK'G
—RIM JOIST
JOIST
ti
LAM. STUDS
TOGETHER W/
16d AT 5' O.C.
Sr:'LE PLATE
NAILING
BOUNDARY
NAIL
SEE DET 2 /SEE PLAN IF PLYWOOD
IF BM EXTENDS CEILING IS REQUIRED
BELOW CEILING FASTEN RAFTER TO WALL
PLATE all SIMPSON 'HP
SEE DET I FOR ADD'L INFO,
SOLID BLKG.
Project: Structural Details
Location. Pacific Northwest
0 Copyright 1993
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR "LTPS'
.1111
II'0
.11 II:
15 ROOF LEDGER DETAIL
ANCHOR EMBED
DIAMETER DEPTH
5/8' 10'
314" 11"
1/5" 13"
HOLDOWN
GRADE A35"
THREADED ROD
SEE SIMPSON
CATOLOG FOR
DIAMETER
I
13 MISSING NOLDOUJN 4NG1-4018
BOUND NAIL ROOF PLYWD 10
2 X 10 LEDGER WI BEVELED
TOP TO MATCH ROOF SLOPE.
NAIL LEDGER WI (2) -16d EA
WALL STUD t EA 2 X 6 BLKG.
(USE Tx 8 BLKG. IF TRUSS ROOF)
FOR THIS SECTION OF ROOF,
BLOCK PANEL EDGES W/ 2 X d
FLAT NAIL 8d 4 O.C. EDGES
AND BOUNDARIES, 12' O.C. IN FIELD.
SHEARU)ALL PLYWD MUST EXTEND
DOWN TO BOTTOM WALL PLATE
C.="1.-47: (TY\ 8N.
APA -RATED
WALL
SHEATHING
(2) -2x OR
dx (REF TO
PLANS)
HOLDOUN
STRAP WRAP
AROUND DEL.
JOISTS
SIMPSON
'HTS30"
EA. SIDE OF
DEL. JOISTS
(PROVIDE WEB
STIFFENDER IF
I -JOIST USED)
®1-4OLDOLUN TO TRIM J5T
IF THIS IS A SH'WALL
W/ A HOLDOWN.
THEN EXTEND SHTI.I'G
THRU t EDGE NAIL
NOTE.
THIS DETAIL IS REQ'D.
ONLY WHEN TWO J._
SI- IEARWALLS SHARE
ONE HOLDOWN.
X
SHTHG.-
GABLE END TRUSS
a
EITHER NO
JOINT IN PLYWOOD
OR
FASTEN SH'WALL TO
ENDWALL TRUSS W/
BLOCKING/RIM
FASTENERS SHOU.N
IN SN'WALL SGHD'L.
SH'WALL SEE
GH'WALL SCHEDULE
FOR NAIL'G REQMTS.
By RF
Date 1/2007
Job No 7000
(12)10d
EA. END
OF STRAP
SOLE PLATE
NAIL ING
BOUNDARY
NAIL
SIMPSON "LS5O"
MAY SUBSTITUTE
JOIST FOR 'LTPS'
L DEL. JOIST AT
EACH END OF WALL
OVER DEL. STUDS
FASTEN TO RIM JOIST
W/ SIMPSON 'LSO'
Sheet No
dx6 OR
(2) 2X STUDS
I6d AT 6 O.C.
HOLDOLLN
I6d AT 5' O.G.
INTO EA. STUD
EDGE NAIL
FRAMING AT CORNER
2x4 FLAT AT 24" O.C.
IN END -WALL TRUSS
2X VERTICAL BRACE
(2) 10d AT 8' O.G.
Sol AT 6' o.c. 2x4 BLKG. AT 6 -0' O.G.
AT ALL FRAMING WI 8d AT 3" O.C.
ME OF T J' i N
5' -m0" OF EDDGE E F I I I I I N
TRUSS BOTTOM CHORD OR CEILING JOIST
(2) I6d EA. TRUSS
2x4 x 8' -0" LATERAL
NAILS BASED BRACE AT 5 -0' o.c.
ON SHEARWALL (6) I6d NAIL
REQMTS. BELOW
IF 'H' EXCEEDS 6 -0' THEN INSTALL
2x4 ON EDGE BEHIND 2x4 FLAT IN
END -WALL TRUSS. IF 'H' EXCEEDS
12' -0' USE 2x5 ON EDGE. SEE ABOVE.
DBL. 2xSOLID BLOCK
W/ (2) SIMP 'LS50'
TO WALL PLATE
2x6 PLATE W/ 16d
AT 12' o.c. TO WALL
GYPSUM BOARD
DIAPHRAGM WITH
5d COOLER NAILS
AT 1' O.C. AT FIRST
(4) CEILING MEMBERS
AND 2x5 PLATE
GA8LED ENDUJALL
Architecture Engineering, Inc.
II
SHEARWALL
2x SOLE E 1
SEE SCHDL
FOR INFO
I
L
F0120 04,9„
00010
R
Ef0 Io
INTERFLOOR HOLDOWN
it
.I
CUT x 4"
SLOT IN SHTHG.
2x SOLID BLK'G EACH
SIDE NEXT TO STRAP
I.. (2) -2x OR dx
(REF TO PLANS)
HOLDOILN STRAP
(INSTALL STRAP W/
EQUAL LENGTH TO
BEAM l STUDS.
DBL. JOIST
OR SEAM
(12) 10d EACH
END OF STRAP
1-10L DOWN DETAIL
ROOF
TRUSS
T
(2) I6d INTO TRUSS 7<B CHORDS
2x4 AROUND BLKG.
PANEL PERIMETER
1
1/2" PLY SHTH'G. W/
10d AT 4' O.C. EDGES
WALL TOP PLATES
1;
;BOUNDARY
NAIL
SOLID BLK'G.
SIMPSON "LIP'S'
7 SCHEDULE
FOR SPACING
SOLID WOOD
BELOW SEAM
EN. SHTHG
STUD W/ TO ST RAP
I6d AT S" O.G. FROM BLKG.
PANEL TO WALL PLATES
®Sf4EAW4LL EXTENSION
FOR TRUSS- FRAMED ROOFS
Project. Structtital Details
Location. Pacific Northwest
cU Copyright 1993
UNLESS OTHERWISE
SPECIFIED,USE (2)
SIMPSON '14T530"
EA. END OF BEAM
3' DIA VENT
HOLES AT 10' O.G.
PER IBC 12032
2x4 FLAT EDGE FRAMING
NAILED TO TRUSS VERTICAL
W/ I6d AT 6 O.C.
2X SOLE IE
SEE SCHEDULE
FOR INFO
APA -RATED
ROOF SHEATHING
2 X SOLID
FRIEZE BD
(2) -2x OR 4x
(SEE PLAN)
By RF
Date 1/2007
Job No 7000
HOLDOWN STRAP
(INSTALL WITH
EQUAL LENGTH
TO BEAM AND
STUDS.
L 2 X SOLID BLK'G
BELOW ENTIRE LENGTH
OF SHEARWALL.
1-10L DOWN DETAIL
2 X STUD WALL
SHEARWALL NAIL
SAME .45 BELOW
SOLID BLK'G.
SIMPSON 'LSSO'
MAY SUBSTITUTE
FOR 'LTPS'
CLG. JST
APA -RATED
SHEATHING
S heet No
SNEARWALL EXTENSION
FOR STICK FRAMED ROOFS
NAIL Sd AT OC. INTO
EACH SHEAR TR.155 FOR
DIAPHRAGM LOAD UP TO
200 PLF OTHERWISE USE 3' O.C.
UNLESS SPECIFIED OTHERWISE,
EITHER SHEAR TRANSFER
SYSTEM MAY 85 USED
SHEAR TRUSSES
EACH DESIGNED FOR
DIAPHRAGM SHEAR LOAD
SHOWN ON PLANS
(TRUSS TO TRANSFER SHEAR
FROM TOP TO BOTTOM CHORD)
(4) 16d NAILS
2x5 AT 16 O.G.
W/ (3) I6d EA. END
SHEARWALL
SHEAR TRUSS MAY BE ELIMINATED IF
SHEARWALL EXTENDS UP TO ROOF
SHEATHING. SEE DET no FOR INFO.
FASTEN TRUSS TO WALL
W/ 'LS50' CLIPS
SEE SCHEDULE FOR SPACING.r�"
@SI—lEARWAL L EXTENSION
Architecture Engineering, Inc
I. '1
BEAM
II
11
II
II
II
I I
IL
BOLT DECK LEDGER
TO RIM JOIST WI 9'e "0
AT 16' OA. AND (2) ROWS
I6d AT 8' O.C.
(USE 2 -5/8' BOLTS IF
JOIST SPAN GREATER
THAN 10' -0'
FLOOR JOIST I
2X STUD WALL
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
BEAM
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
STRAP SEE
FLOOR PLAN
4 X 8 POST
I�I
SIMP. 'MSTC40"
EA END OF HEADER
FASTEN TO
DBL. STUDS
-DRILL HOLE VS" GREATER IN DIA.
N CENTER OF BEAM FOR BOLT
I 11
5" SQ X 3/8" BRG PLATE
PEEN THREADS AFTER TIGHTENED
1- I0LDOUJN ABOVE BEAM
THIS DETAIL ALWAYS APPLIES.
APA- RATED)
SHEATHING
EXTERIOR WALL
DECK LEDGER 1- 1ANDRAIL CONN
THIS DETAIL ALWAYS APPLIES.
16d 0 6"
�MULTIPULE
HOLDOWN STUDS
i' SEE SCHEDULE
CUT 1" X 4" SLOT IN PLY
FLOOR SHTHG FOR STRAP
I I
II
II
SIMPSON "H2.5"
EA. SIDE
Project. Structural Details
Location Pacific Northwest
Q Copyright 1993
2X LEDGER
2X BLKG.
AT STRAP
HOLDOWN W/ A36
GRADE THREADED ROD
TREADED ROD
SIMPSON 'MSTC"
WRAP STRAP AROUND
HEADER IF NECESSARY
FILL CAVITY W/ SOLID
WOOD AT HOLDOILNS
IL JI IC
ISG I-�- -2X6 DIA. BRACE
ST6224 STRAP WRAP
AROUND BACK OF LEDGER
I NAIL TO DIAG. BRACE
NOTCH 4X8 FOR 3"
BEAM BEARING
4 X 12 BEAM
SIMPSON "PHD2" W/
5/8" X 8" EXP BOLT
CONCRETE FTG.
SNEAiRUJALL E'OST CONN.
25 FORCl -I /DECK FOST CONN.
W/ (2) I6d EA. JOIST
SIMPSON ABU"
POST BASE
OR ELEVATED
EPB" IF SLAB
OR USE BASE
CONN. SHCUN IN
DETAIL '30
2X SPACED CEDAR 1
DBL. 2X MEMBER OR
4X MEMBER RIM JOIST
1 4 X3 X6 "XO' -9"
STEEL 4J4 LE
-I II II
JOIST
DOUBLE 2X
BEAM
PERPENDICULAR WALL
4 11 /2 4
5/8 4 THROUGH BOLTS W/ NUTS
AND I DIA X 3/I6" WASHERS.
EA SIDE. 4X6 CEDAR NEWELL
TO RIM JOIST
(6) I6d 2 NAILS AT THE TOP
MIDDLE, I BOTTOM
CONNECT WALLS TOGETHER BY FIRST
(5) I6d THEN INSTAL D NAL
2x4 AGAINST IT AND NAIL W/ (6) I6d
N
PLYWOOD SHEATHING
OVER WALL STUDS
By RF
Date 1/2007
Job No 7000
EDGE NAIL (EN)
TO END 2x4
(6)16d
1
BEAM
PRESSURE TREATED
WOOD POST
CONCRETE SLAB
CONC.PTG.
--4-
Sheet No
UNLESS NOTED OTHERWISE,
USE 'SIMPSON' PC"
POST CAP
(USE "EPC" AT
ENDS OF BEAM)
EDGE
NAIL
O 21 SNEARWALL EXT WALL CONN
THIS DETAIL ALWAYS APPLIES.
Architecture Engineering, Inc
NAIL SHTHG TO
GIRDER TRUSS W/
ad AT 6 0G.
BOUNDARY
NAIL (BN.)
2 X SOLID _I
FRIEZE BD
NAIL WALL 51-171-1G.
TO EA. HOLDOWN
STUD W/ I0d 6
FOR 2 -STORY
CONDITION, USE
'MSTC28' STRAP
DIRECTLY BELOW
GIRDER TRUSS
TIEDOWN ABOVE
RECOMMEND
USING 'DRY'
LUMBER RIM
J0157 OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
NAIL (16) 12d
EACH END
TO STUDS ONLY
SEE DETAIL 11
TRUSS BOTTOM
CHORD OR
CEILING JOISTS
TT
1
THIS DETAIL ALWAYS APPLIES.
(4) I0d EA. BLK
FLOOR JOISTS
y n
Il
(2) BAYS OF
4X SOLID BLKG
WI (2) I6d EA. END
CONNECTOR SEE PLAN
FOR SIZE. INSTALL WI
EQUAL LENGTH TO WALL
AND BLOCKING. RE- ENTRANT
CORNER
Project. Structural Details
Location. Pacific Northwest
0 Copyright 1993
SIMPSON 'LGT' TIEDOIIIN
AT EA. GIRDER TRUSS
NOTE:
THIS DETAIL NOT REQ'D
IF TRUSS MFG. CALCS SHOW
LESS THAN 1000" NET
UPLIFT FORCE AT GIRDER
TRUSS REACTION. IF SO,
THEN USE (2) 4H2.5T' TIES
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
2 X BLOCKING AT
6 -0' O.0 WI (3) I0d
TOENAILS TO PLATE
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
NAIL WALL SHTHG.
TO EA. STUD WI
10d AT 6 OC.
G IIRDEIR -TRUSS CONN
FASTEN CLG. TO
BLKG. WI DRYWALL
SCREWS AT 4 O.C.
31
WALL- 70- CEIL'G CONN
APA -RATED SHTI -IG.
FILLER ON SIDE OF BM.
EDGE NAIL (EN.)
NAIL FULL -HGT STUD
TO BEAM W/ (2) ROWS
I6d AT 3 O.C. STAG'RD
2 X STUDS W/
16d AT 8' O.G.
STAGGERED
FULL -HGT
WALL
PANEL
EDGE
NAIL (EN.)
EDGE NAIL (EN.)
WALL TOP
PLATES
NAIL WALL SHTHG
TO F.H. STUDS WI
10d AT 6 O.C.
EXTERIOR VIEW
SUPPORT POST
TO SEAR ON FELT
30" FELT MOISTURE
BARRIER OVER
5000 PSI NON SHRINK
GROUT (THK mudeIIU
CONCRETE FOUNDATION
11
11
WHEN PANEL IS 1)
24" 25' WIDE, Il
PROVIDE 'LTPS
EACH END
AT BASE
By RI'
Date 1/2007
Job No 7000
EDGE NAIL
AROUND
OPENING
_04
NOTE:
(4) 2x6 LAM. W/ 16d AT 8" O.C.
EQUALS A 6x6 SUPPORT POST
Sheet No
5M-TO-WALL CONN
I- IOLDOWN EA. SIDE
USE 'HDSA UNLESS
NOTED OTHERWISE
POST TO -FDN CONN.
PERFORATED/ WALL DESIGNATION
V ra
32
THIS DETAIL ALWAYS APPLIES.
TIE WALLTOP
PLATES TOGETHER
WI MSTC40 STRAP
-C STOP RIM JOIST
EA. SIDE OF BM
FASTEN TO F.N.
STUD W/ (2) 10cl TN.
FULL -I-IGT STUD EA.
SIDE OF BEAM
BEAM TO BEAR ON
ON FULL AREA OF
2X STUDS LAMINATED
W/ I6d AT 12' O.G.
PT MUDSILL
STOP AT GROUT
5 /8 "0 EXP BOLT WI
4 1/2 MN. EMBED
PANEL
WIDTH
EDGE
NAIL (EN.)
RIM JOIST
SEE SCH'DL
FOR 'LTPS'
SPACING
PERFORATED WALL NAILING
Architecture Engineering. Inc
T/ WALL
IL/ SEE PLAN r
I
"H" (4 -E' MAX.)
I
4' -0"
e l k T/ WALL li MIN.
SEE PLAN I
I
I 1' -0"
I; MN. I
T/ FOOTING I
lid SEE PLAN 1 I (c .r
I
z T/ FOOTING 1 l
j'' J
(3) CONT.
T
ADD'L BARS IF
SPECIFIED CN PLANS
H' 2 I' -6
MIN. MN.
THIS DETAIL ALWAYS APPLIES.
HD ANCHOR' EMBED.
DIAMETER DEPTH
5 /5" I 10"
3/4" 1 II"
l /8" I 13"
18' UNA.
FOUNDATION STEP
4
0 35 SNEARLALL AT SLAB
THIS DETAIL ALWAYS APPLIES.
BEAM
FACTORY GLUED
BRG. BLOCK
COLUMN CAP
SEE PLAN FOR TYPE
II 0
1° _JL_ °i
HOLES MUST BE SPACED
AT LEAST 18' APART —7
THIS DETAIL ALWAYS APPLIES.
STEMWALL
FOOTING
UNDISTURBED
EARTH
MATCH FOOTING 22.-0
REINFORCING
AND TIES
APA RATED
SHEATHING.
5189. A136 OR
5/e EXP BOLTS
(5' MN. EMBEDMT)
AT HOLDOU.NS, USE
(A3.) THREADED ROD
WI SIMPSON 'SET' ADHESIVE.
(SPECIAL INSPECTION
REQUIRED BY CODE)
2' -0'
0
FOOTING DEPTH (HD
EMBEDMENT DEPTH 4
USE 14 (MN) DEPTH
ACCEPTABLE AREA TO DRILL
MAX 2 3/4 DIAMETER HOLE.
HOLES MUST BE AT LEAST
3' -0" FROM SUPPORTS 4 MIDSPAN
AND IN THE MIDDLE THIRD
.L OF THE BEAM DEPTH.
3'1 CCLULAI" I -BEAM PENETRATIONS
Project Shearwall Schedule
Location Pacific Northwest
0 Copyright 1993
2X6 FLAT ILL'
16d EA TRUSS
Sd 6 00.
OVERFRAMING
TRUSSES OR
1X FRAMING
EXTEND ROOF
SHTNG
DOLLN
TO BLKG.
PREFAB TRUSSES
OR 2X FRAMING
3' -0"
THIS DETAIL ALWAYS APPLIES.
4 -BAYS OF 4X BLKG.
—APA -RATED
FLOOR SHEATHING
By RI'
Date 1/2007
Job No 7000
IF RAFTER IS LESS
THAN 12" FROM
SHEARIUUALL, THEN
BLOCK (2) BAYS
IF SHEARLIALL
FALLS DIRECTLY
BELOW A RAFTER,
THEN USE PET. •3
2X BLKG. AT 32" CC.
W/ (2) lbd EA. END
EA. SIDE OF SH'IUALL
CEILING JOIST
I>C
STUD WALL
Sheet No
ROOF OVERFRAMING
10d 4 O.C.
ROOF 5HTS
Brt
E3UTTERFL DfizACG STRUT
APA -RATED
SHEATHING Ul/
ea 6 EDGES
12" FIELD
led EA TR)55
2X SOLID BLKG.
2X STUD WALL
SIMPSON "PHDS" FIOLDOU.N EA.
END W/ 5/5' DIA (A36) THRD ROD
RECOMMEND BUILDING SHEARWALL 3/16" SHORT
TO ALLOW FOR VERTICAL SHRINKAGE OF RAFTERS
Sd AT 3' OC.
Sd AT 6 OC.
r ROOF SHTI.IG.
RAFTERS
SHEARWALL
TO MATCH
BELOW
NAIL BLKG.
TO STUD
SHEARWALL
8 51-1EARLUALL EXTENSION
4.
1 )H
PREPART.E Er Sun Desigr
Tigard, Oreqrn
CliPnt SUNTEL
F ict MHILL '-t
L:calon GARAGE DR HDRF1
Calculation B. Ni
0:mm2n1
BEAM N A L NT 9 3 3
BEAM AND LOAD DIAGRAM
I
Will16"'"'" "tultaikSiatiiiiMIEM11"
R1
R:.:.
Ri t 1". m lb= Rsacti n Ri 1 "6) H lbs
7 al l_ad
TiF;r:Eicna span 15 fee r: erhanq
1
N: .1- i.arol la oaus.
m ..Je •eigi 5 lt2 1 t= .14f
Lr F:rn °ads J F 1 1 0 if f p t :,:f 16 0
1:....tq o Is ie,..d 1. 1 :6(
Pr 4nCE 7"- Lt-O 4 41
7 "...3F ST-N 7:Ec r.:' REG IFD h0T_
i..: ,.b..., 1 -7 7 F.' 7 .45 A 2a 3q In
1 M en I 4 J 'ES 4c F'q 1 g 1.1 Sr- 11:
Eefle:f .r 5: E i -7 ES M in 7 'le r 4, a
A 2' inche=
Ma .mum Def :n c u ra O" re■=i
MA imim M M2r1 Lr.r
MTM'MLM BEAM SIZE W
1INIMUM BE A0 -RE A S In 1
4:231 0:e
1
1 H
'PEP-iRED Suntel Design
Tiiard Oregiin
Mien+ SUNTE!
Pr:iect AMHILL
L:cati=n PORCH BEAMP
Calculati:n B L M
CDmment
2 F ANAL fE.T.
BEAM AND LOAD DIAGRAM
iithENIUZIMIEBilliamogitaraZirrauamuniatilSEM
R:.
P:= Pi ;0 lbs Rea_tl:n P2 Ei) lb=
T 1 lead s 1 I lb=
rim C ea r span k fi=F- nr n erhang
ptifl :E4:1E
:Lang ar ads
m cam e 1-r.E. 1'
Lnif m ads Li 12
nefl=ec liriL (11 p s dead 1:ac.
Sheer lbs i
1 f -1Ls) F.: -n.--,7; Se 1...d ]u
D=t1 in 4: E i S ES Mm Ina ''.Et
MA. imim Ocr "i_n
Ma imum Der1e»in :ire at 4 5
Ma .mum M cur= 4 7 fee
MINIMUM BEAM RI .E (W H)
IINIMLM SEAM AREA (Sc In
lb= a
ce t fn
1 4
BE M 7- FE WrICE =IR L.“
D=.=iT" =IR:PERT:ES R7n1IPPD fl.TU L
;7 Cl c >r
4.4 is
EZ.
lUH
PREPARED BY
Client
Pr:ject
L:cati:n
Calculati:n By
Ccmment
Reacti:n R1
T:tal 1:ad
Dimensicns
PDint IDads P1
No triangular 1:ads
Unifprm beam weight=
Uniform lcads U2
U1
Dsfle-+inn limit
Shear (lbs)
Mcment (ft-lbs)
Deflecti:n (in)
BEAM
Suntel De=ign
Tigard, Oreg:n
SUNTEL DESIGN
YAMHILL
BEAM AT NOOk
LM
R1
Actual MaAimum Deflectizn
Ma imum Deflecti:n Dccurs
Maximum MDment occurs
ANALYSIS
BEAM AND LOAD DIAGRAM
P1
0NN���0���
vmmmmmmmmmm
000TW0
mmIgnImmwx.
w111”:1
R2
2 30D 2 lbs
5,985 lbs
Clear span 9 feet, nc cverhang
Reacti:in R2 3,675 8 lbs
1 JN o lbs at 5 feet
15 lbs/lf 135 lbs total)
75m U lbs/lf at 4 m feet 3 0 feet
7 '0V lbs/lf at 0 feet t'D 4 0 feet
(live I:ai plus dead l:ad) 1/260
BEAM TYPE LAM 24 F GLUL*M
COMPUTED STRESS STRAIN DESIGN /AL PROPERTIES REQUIRED ACTUAL
8 58J
V
8 FV 165 Area (Sq In
J FB 2 4m m Se:t MDdulus
30 E 1 8»E6 Mcm Inertia
0 3) inches
at 4 5 feet
at 5 0 feet
MINIMUM BEAM SIZE (W H/
MINIMUM BEAM AREA Sq In 48 40
0� ^=r c�
45
58
11 )8*
Calculation By L M
Comment BEAM NR 4
L� H M H IV H L Y I b
PREPARED BY Suntel Design
Tigard, Oregon
Client SUNTEL DESIGN_
Project YAMHILL
Locati:'n BEAM AT LIV /DIN RM
BEAM AND LOAD DIAGRAM
IIIMIIII €IIIII IIII I IIIIIIIIIIIIIIIIIIIIIIIIIIIIII1
Ri
Actual Ma imam Deflection C) 35 inches
Maximum Deflecti Dn :occurs at 5 C? feet
Maximum MDment :'ccurs at 5 n feet
MINIMUM BEAM SIZE (W H)
R2
Reaction R1 3,0 5 lbs Reaction R2 3,097 5 lbs
Total 1Dad 6,1D5 i) lbs
Dimensions Clear span in 5 feet, no overhang
No point 1:'ads
N: triangular lads
Uniform beam weight= 15 lbs /if 157 5 lbs t:tal)
Unit 'rm 1 :ads U1 575 0 lbs/If at 0 0 feet t: 100 5 feet.
Deflecti:tn limit (live lead plus dead load) 1/360
BEAM TYPE LAM 24 F GLULAM
COMPUTED STRESS /STRAIN DESIGN VAL PROPERTIES REQUIRED ACTUAL
Shear (lbs) S 0D7 5 FV 165 U Area (Sq In 28 40
Moment (ft-lbs) 8,112 5 FB 2,4o0 0 Sect M:udulus 41 6()
Deflecti:n (in) 0 35 E 1 80E6 Mom Inertia X55 255*
MINIMUM BEAM AREA (Sq In 43 13