Loading...
HomeMy WebLinkAbout939 Caroline St Technical 1997 - BuildingPer m►t Addr tra 0 t�a�vv s oli, \Ao rA-c4 2 P r ��;,�;on,s ,,�o� c, d ,ale m ►t wa s f ►r Date the per S. /-cri____ Da pages techn ►cal p Number c‘ *-4 N 1� 1 1 V \CI):)e/CI \*IM1/4'°U(k o 0---- ,o �n5 1 1 1 1 1 1 1 1 1 1 Q3c Caro n -6 S+ OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PROJECT #96160 '00 SEPTEMBER 11 1997 MAHLUM NORDFORS MCKINLEY GORDON PROJECT MANUAL VOLUME lA pivIsIoNs-o 7 OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PROJECT MANUAL VOLUME lA DIVISIONS 0 7 PROJECT #96160 00 SEPTEMBER 11 1997 MAHLUM NORDFORS MCKINLEY GORDON 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- THE PROJECT 1.1 IDENTIFICATION Olympic Memorial Hospital 2 Main/Surgery Additions Alterations 1.2 PROJECT ADDRESS Olympic Memorial Hospital 939 Caroline Street Port Angeles, Washington 98362 1.3 PROJECT DESCRIPTION See Section 01010 Summary of Work, for complete project description. 1.4 OWNER Olympic Memorial Hospital 1.5 OWNER'S PROJECT MANAGER Mr Mike Glenn (360) 417 -7703 PART 2 THE DOCUMENTS 2.1 TITLE 2.2 DATE `The Construction Documents for the `Olympic Memorial Hospital 2 Main/Surgery Additions Alterations. The construction documents are dated September 11, 1997 PART 3 THE DESIGN TEAM 3.1 CERTIFICATION I hereby certify that this project specification was prepared by me or under my direct supervision and that I am a duly registered architect under the laws of the State of Washington. SECTION 00002 PAGE 1 INTRODUCTION MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 ARCHII'J CT Mahlum Nordfors McKinley Gordon Vince Nordfors, Principal O)an Jardine, Project Manager Gary Braun, Project Architect Charles Nighbor, Architect Naoto Sekiguchi, Architect Holly Johnson, Team Assistant 3.3 CONSULTANTS Mechanical Engineer Facility Support, Inc. (a.k.a. FSi) Rob Danforth, Project Manager Jill Connell, Project Engineer Electrical Engineer Spading Katrina Corbett, Project Engineer Structural Engineer Martens/Chan Randy Martens, Project Principal Steve Sandhorst, Project Engineer Civil Engineer Northwestern Territories, Inc. Joe Donisi, Project Engineer Interior Designer Distinctive Designs by Julie, Inc. Julie Haguewood, Principal SECTION 00002 PAGE 2 INTRODUCTION 2505 Third Avenue, Suite 219 Seattle, Washington 98121 (206) 441-4151 (206) 441 -0478 (FAX) 605 First Avenue, Suite 400 Seattle, Washington 98121 (206) 622 -3321 (206) 622 5804 (FAX) 720 Olive Way Suite 1100 Seattle, Washington 98101 -1853 (206) 667 -0555 (206) 667 -0554 (FAX) 400 Mercer St. Suite 410 Seattle, Washington 98109 (206) 298-9818 (206) 298 -9876 (FAX) 717 South Peabody Port Angeles, Washington 98362 (800) 654 -5545 (360) 452 -8498 (FAX) 705 Christman P1. Port Angeles, WA 98362 (360) 452 -3540 (360) 452 -6638 (FAX) MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDmONS ALTERATIONS Cost Estimator Rider Hunt Ackroyd 999 Third Avenue, Suite 830 Peter Knowles, Project Estimator Seattle, Washington 98104 (206) 223-2055 e (206) 223 -2056 (FAX) Hardware Consultant Frank Schelhamer 4015 192nd Pl. SW Lynnwood, WA 98036 (206) 778-1232 0 1997 Mahlum Nordfors McKinley Gordon SECTION 00002 PAGE 3 INTRODUCTION END OF SECTION 00002 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS DESCRIPTION OF CONTENTS THE CONTRACT DOCUMENTS CONTAIN THE FOLLOWING. VOLUME 1A PROJECT MANUAL 1 Division 0 Bidding Requirements, Contract Forms, and Contract Division 1 General Requirements Divisions 2 7 Technical Specifications VOLUME 1B PROJECT MANUAL Divisions 8 -14 Division 15 Division 16. SECTION 00003 PAGE 1 TABLE OF CONTENTS Technical Specifications Mechanical Specifications .Electrical Specifications VOLUME 2 PROJECT DRAWINGS See Cover Sheet, Drawing A 0.1.2, for list of Drawings. VOLUME 1A PROJECT MANUAL Unit Description No. of Pages DIVISION 0 BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE CONTRACT Section 00002 Introduction. 3 00003 Table of Contents 5 00030 Advertisements For Bids 2 00100 Instructions For Bidders 1 AIA Document A701 Instructions to Bidders, 1987 Edition 5 Supplementary Instructions 2 00220 Geotechnical Data. 1 Soils Report. 25 00300 Bid Form 3 00320 Bid Bond 1 00420 Bidder Qualification Form 4 00510 Form of Agreement 1 AIA Document A101 Form of Agreement, 1987 Edition 8 Supplementary Provisions 1 00515 Contract Transmittal 1 00520 Notice to Proceed 2 00700 General Conditions 1 AIA Document A201 General Conditions of the Contract, 1987 Edition 24 Supplementary Conditions of the Contract. 6 Special Conditions of the Contract 4 00900 Addenda 1 DIVISION 1 GENERAL REQUIREMENTS Section 01010 Summary of Work 4 01011 Contract Time and Sequence 7 01014 Project Finishes and Openings 2 01026 Payment Procedures 3 Affidavit for Payment of Retained Percentage (Form MNMG1060) 1 01027 Schedule of Values 2 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS DIVISION 2 SITEWORK Section 03300 Cast -In -Place Concrete 03450 Architectural Precast Concrete Plant Cast. 03650 Cementitious Underlayment SECTION 00003 PAGE 2 TABLE OF CONTENTS 01030 Base Bid and Alternates 2 01036 Change Order Procedures 2 Change Order Proposal (Form MNMG1038) 1 Change Order (Form MNMG1039) 1 Architect's Supplemental Instructions (Form MNMG1036) 1 Construction Change Directive (Form MNMG1037) 1 is 01045 Cutting and Patching 4 01064 Seismic Anchorage Requirements 5 01065 Code and Permit Requirements 2 01091 Reference Standards 13 01095 Explanations, Definitions, Abbreviations, Symbols 5 01121 Hazardous Materials Procedures 2 01122 Hazardous Materials Report. 1 01200 Project Meetings 2 Progress Meeting Agenda (Form MNMG 1068) 1 01300 Submittals 7 Submittal Cover Sheet/Transmittal (Form MNMG1046) 1 01310 Progress Schedule 3 01400 Quality Control 10 01500 Construction Facilities and Temporary Controls 6 State Fire Marshall Information Sheet A -1 1 01600 Material and Equipment 4 01610 Delivery Storage, and Handling 1 01630 Product Options and Substitutions 3 Substitution Request Form (Form MNMG1063). 1 01700 Contract Closeout 5 01710 Final Cleaning 2 01720 Project Record Documents 3 01745 Warranty Procedures 3 Contractor's Warranty 2 Subcontractor's Warranty 1 Section 02060 Building Demolition 4 02070 Selective Demolition 6 02110 Site Clearing 3 02160 Excavation Support Systems 4 02200 Earthwork 9 02511 Hot -Mixed Asphalt Paving. 5 02520 Portland Cement Concrete Paving 15 02665 Water Systems. 11 02700 Sewerage and Drainage 14 02711 Foundation Drainage Systems. 5 02810 Irrigation Systems 12 02900 Landscaping 6 DIVISION 3 CONCRETE 16 9 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS DIVISION 4 MASONRY Section 04200 Unit Masonry 9 DIVISION 5 METALS Section 05120 Structural Steel 7 05210 Steel Joists 4 05310 Steel Deck 6 05400 Cold- Framed Metal Framing. 11 05500 Metal Fabrications. 15 05510 Metal Stairs 7 05810 Expansion Joint Cover Assemblies. 7 DIVISION 6 WOOD AND PLASTICS Section 06100 Rough Carpentry 4 06200 Finish Carpentry 4 06402 Interior Architectural Woodwork. 9 06650 Solid Surface Wall Panels 3 DIVISION 7 THERMAL AND MOISTURE PROTECTION Section 07100 Concrete Sealers. 3 07120 Fluid- Applied Waterproofing 3 07210 Building Insulation 4 07241 Exterior Insulation and Finish Systems Class PB 11 07242 Direct Applied Exterior Finish System 7 07251 Fireproofmg 5 07270 Firestopping and Smokestopping 8 07412 Manufactured Wall Panels 4 07530 Single -Ply Membrane Roofing 5 07600 Flashing and Sheet Metal. 5 07716 Roof Specialties. 4 07720 Roof Accessories. 3 07820 Aluminum Framed Skylights 6 07901 Joint Sealants 8 VOLUME 1B PROJECT MANUAL Unit Description No. of Pages DIVISION 8 DOORS AND WINDOWS Section 08110 Steel Doors and Frames 6 08211 Flush Wood Doors 5 08305 Access Doors. 5 08310 Aluminum Sliding Glass Doors 5 08410 Aluminum Entrances 7 08520 Aluminum Windows. 7 08710 Door Hardware 15 08800 Glazing 12 DIVISION 9 FINISHES Section SECTION 00003 PAGE 3 TABLE OF CONTENTS 09255 Gypsum Board Assemblies. 13 09280 Glass- Reinforced Gypsum Fabrications. 3 09300 Ceramic Tile 6 09511 Acoustical Panel Ceilings 6 09660 Resilient Tile Floorings 4 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 00003 PAGE 4 TABLE OF CONTENTS 09666 Sheet Vinyl Floor 5 09678 Resilient Base. 4 09680 Carpet 7 09900 Painting 11 09950 Wall Coverings. 3 DIVISION 10 SPECIALTIES Section 10100 Visual Display Boards 3 10190 Cubicles 2 10200 Louvers and Vents 6 10265 Wall Surface Protection Systems. 5 10522 Fire Extinguishers 3 10800 Toilet and Bath Accessories 5 10990 Miscellaneous Specialties 3 DIVISION 11 EQUIPMENT Section 11452 Appliances j 4 11700 Equipment 7 DIVISION 12 FURNISHINGS Section 12511 Horizontal Louver Blinds 2 12541 Draperies 2 DIVISION 13 SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 CONVEYING SYSTEMS Section 14240 Hydraulic Elevators. 7 14600 Pneumatic Tube System 4 DIVISION 15 MECHANICAL Section 15010 General Provisions 7 15020 Vibration Isolation 3 15030 Mechanical Painting and Identification. 3 15040 Balancing Air and Water Systems 4 15060 Piping and Fittings. 10 15070 Mechanical Systems Insulation 8 15090 Piping and Mechanical Equipment Support 6 15100 Valves. 4 15420 Soil, Waste, and Vent Systems 2 15440 Plumbing Fixtures and Trim 9 15480 Medical Gas Systems 10 15500 Automatic Fire Protection Systems 5 15640 Refrigeration Equipment. 4 15650 Liquid Heat Transfer Systems 3 15660 Steam Systems 3 15700 Air Handling Equipment. 9 15800 Air Distribution Systems. 11 15850 Air Filtration. 3 15900 Automatic Temperature Controls. 10 DIVISION 16 ELECTRICAL Section 16010 General Provisions 16020 Schedule 16030 Testing 16040 Identification 8 2 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 00003 PAGE 5 TABLE OF CONTENTS 16051 Existing Systems 5 16100 Basic Materials and Methods 5 16110 Raceways. 4 16114 Cable Trays. 2 16115 Cable Rings 1 16120 Conductors and Terminators, Copper Only 2 16130 Outlet, Junction, and Pull Boxes 3 16140 Switches and Receptacles 4 16160 Motor Controllers 3 16170 Disconnects and Fuse Switches 2 16180 Fuses 1 16190 Supporting Devices 5 16450 Grounding. 2 16470 Switchboard 1 16471 Panelboards 3 Appendix 1 New Panelboards. 14 Appendix 2, Existing Panelboards w/ Modifications. 28 Appendix 3, Existing Panelboards to be Demolished 8 16500 Lighting 8 16501 Light Fixture Schedule 6 16660 Isolated Power System 3 Appendix 1 New Panels. 15 Appendix 2, Existing Systems to be Demolished 6 16670 Equipotential Grounding System 2 16700 Communications. 2 16721 Fire Alarm System 14 16724 Smoke Damper Control. 2 16731 Elapsed Time Clocks 1 16732 Clock System. 3 16740 Telephone, Computer Raceway Systems. 2 16750 Nurse Call 8 16758 Intercom Systems. 3 16775 Public Address System 3 16781 Television Distribution System Completion 4 16791 Dictation Raceway System. 1 16930 Lighting Control Equipment 1 16950 Pneumatic Tube System 1 16999 Project Closeout 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS DIVISION AD ARCHITECTURAL DETAILS See Drawings DIVISION AS ARCHITECTURAL SCHEDULES See Drawings VOLUME 4 PROJECT DRAWINGS Unit Description DIVISION A ARCHITECTURAL DRAWINGS See Drawing A0.1.2 for Complete List of Architectural Drawings DIVISION C CIVIL DRAWINGS See Drawing A0.1.2 for Complete List of Civil Drawings DIVISION S STRUCTURAL DRAWINGS See Drawing A0.1.2 for Complete List of Structural Drawings DIVISION PTS PNEUMATIC TUBE SYSTEM DRAWINGS See Drawing A0.1.2 for Complete List of Pneumatic Tube System Drawings DIVISION M MECHANICAL DRAWINGS See Drawing A0.1.2 for Complete List of Mechanical Drawings DIVISION E ELECTRICAL DRAWINGS See Drawing A0.1.2 for Complete List of Electrical Drawings 01997 Mahlum Nordfon McKinley Gordon SECTION 00003 PAGE 6 TABLE OF CONTENTS END OF SECTION 00003 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS LEGAL NOTICE INVITATION TO BID OLYMPIC MEMORIAL HOSPITAL CLALLAM COUNTY PUBLIC HOSPITAL DISTRICT No. 2 PORT ANGELES, WASHINGTON Date of Bid Opening: SECTION 00030 PAGE 1 ADVERTISEMENT FOR BIDS October 9, 1997 In accordance with RCW 70 44 140 you are invited to bid on a contract for the construction of the Olympic Memorial Hospital 2 Main/Surgery Additions Alterations, located within Olympic Memorial Hospital, Port Angeles, Washington. Sealed bids will be received until 2:00 PM at Office of the Administrator Clallam County Public Hospital District No. 2 Olympic Memorial Hospital 939 Caroline Street Port Angeles, Washington 98362 Bids will be publicly opened and read aloud by the Administrator or his/her authorized representative in the Board Room of Olympic Memorial Hospital at 2:00 PM on Thursday October 9 1997 The public is invited to attend the bid opening. In the case of mailing, address bids to Mr Mike Glenn, Assistant Administrator Olympic Memorial Hospital, 939 Caroline Street, Port Angeles, Washington, 98362 Each bid shall be sealed in an opaque envelope and accompanied by a certified check, cashier's check, postal money order, or surety bond (issued by an authorized surety) made payable to Clallam County Public Hospital District No. 2. Bid security shall be in an amount not less than five percent (5 of the total bid. No bid shall be accepted unless accompanied by bid security and any bid bond must be in a form and issued by a surety acceptable to the Board of Commissioners, Clallam County Public Hospital District No. 2. Bids will not be accepted from bidders who have not attended the mandatory site inspection, which will take place at the site, 10:00 AM, Thursday, September 25, 1997 The Board of Conunissioners, Clallam County Public Hospital District No. 2 reserves the right to reject any or all bids. The Board of Commissioners will consider bids and the matter of awarding the contract at the next scheduled public meeting of the Board of Commissioners to be held in the Board Room of Olympic Memorial Hospital. No bidder may withdraw his/her bid after the date and hour set forth above for the bid opening. If a successful bidder fails to enter into a contract in accordance with his/her bid and furnish required performance and payment bonds within ten (10) days from the date he /she is notified that he /she is the successful bidder, such bidder's bid security shall be forfeited. Bona fide bidders may obtain bid documents at: Olympic Reprographics 1016 First Avenue South Seattle, Washington 98134 (206) 343 -1587 MAHLUM NORDFORS McK NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS COMMISSION CLALLAM COUNTY PUBLIC HOSPITAL DISTRICT NO 2 0 1997 Mahlum Nordfors McKinley Gordon SECTION 00030 PAGE 2 ADVERTISEMENT FOR BIDS Bidders should call the printer (listed above) to order sets prior to pick up. A maximum of two sets of documents may be obtained without deposit by AGC general contractors. A maximum of two sets may be obtained with a $150 00 deposit per set by non -AGC general contractors. A maximum of one set of documents may be obtained by AGC and non -AGC mechanical and electrical subcontractors with a $150 00 deposit. All other subcontractors may view documents at a plan center or purchase a set directly from the printer (listed above). Dated this 11th Day of September 1997 at Port Angeles, Washington END OF SECTION 00030 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 00100 PAGE 1 INSTRUCTIONS TO BIDDERS PART 1 GENERAL 1.1 INCORPORATION A. AIA Document A701 Instructions to Bidders, 1987 Edition, is hereby made a part of the Contract as modified by the Supplementary Instructions and is bound herein. 1.2 DESCRIPTION A. Instructions described in this section include: 1 Instructions to Bidders (5 pages) 2. Supplementary Instructions (2 pages) INSTRUCTION SHEET FOR AIA DOCUMENT A701 INSTRUCTIONS TO BIDDERS -1987 EDITION A. GENERAL INFORMATION 1 Purpose AIA Document A701 and the 1987 edition of A201 General Conditions of the Contract for Construction, have complementary provisions and are designed to be used together in the Project Manual for competitively bid projects. 2. Related Documents This Document is complementary- to, and has been prepared for use with, the 1987 edition of A201 It may also be used with the construction management and federal supplement versions of A201 (i.e. A201 /CM and A201 /SC). Specific information for a particular Project must be provided in the Advertisement or Invitation to Bid, in the Supplementary Provisions provided for the Project, or in a supplement to this document. Another set of Instructions to Bidders, AIA Document A771 is published by the AIA for use on projects involving interiors work. 3. Use of Non AIA Forms If a combination of AIA documents and non -AIA documents is to be used, particular care must be taken to achieve consistency of language and intent. Certain owners require the use of owner- contractor agreements and other contract forms which they prepare. Such forms should be carefully compared with the standard AIA forms for which they are being substituted before execution of an agreement If there are any significant omissions, additions or variances from the terms of the related standard AIA forms, both legal and insurance counsel should be consulted. 4. Letter Forms of Agreement Letter forms of agreement are generally discouraged by the AIA, as is the performance of a part or the whole of the Work on the basis of oral agreements or understandings. The standard AIA agreement forms have been developed through more than seventy -five years of experience and have been tested repeatedly in the courts. In addition, the standard forms have been carefully coordinated with other AIA documents, including the owner- contractor agreements and the General Conditions of the Contract for Construction. 5. Use of Current Documents Prior to using an AIA document, users should consult the AIA, an AIA component chapter or a current AIA Documents Price List for the date of the current edition 6. Reproduction AIA Document A701 is a copyrighted work and ma\- not be reproduced or excerpted from in substantial part without the express written permission of the AIA. The A701 document is intended to be used as a consumable —that is, the original document pur chased by the user is intended to be consumed in the course of being used. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce them. The A701 Document may- not be reproduced for Project Manuals. Rather, the normal practice is to purchase a quantitss of the pre- printed forms and bind one in each of the Project Manuals. Modifications maN be accomplished through the use of separate Supplementar\- Instructions to Bidders. Unlike many other AIA documents, A701 does not carry with it a limited license to reproduce. The AIA will not permit the reproduction of this document or the use of substantial portions of language from it, except upon written request and after receipt of written permission from the AIA. B. CHANGES FROM THE PREVIOUS EDITION 1 Format Changes Article 9 Supplementary Instructions, has been deleted. Modifications to these Instructions to Bidders may- now be made by a separate document supplementing these Instructions. 2 Changes in Content The following changes in content have been made in A701 on the recommendation of AIA members, contractors, legal and insur ance counsel and users of the document. INSTRUCTION SHEET FOR AIA DOCUMENT A701 1957 EDITION AIA` TIIE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE NW WASHINGTON. DC 20006 1 Article 1 Bidding Requirements are now specifically defined and made a part of the Bidding Documents. Modifications have been dropped from the list of proposed Contract Documents because these occur only after the Contract is executed and are unknown at the time Bids are solicited. Article 2: A new Paragraph 2 1.2 has been added in which the Bidder acknowledges an understanding of the documents for other portions of the Project being bid concurrently Article 3. The Bidder is required to carefully compare the Bidding Documents with each other and with other Work being bid concurrently or presently under construction. Article 6 The Bidder is required to submit information as soon as practible after notification of the award rather than seven days after notification. Article 7• The time for the delivery of the bonds is now no later than three days after the execution of the Contract, rather than on the date of the Contract. The bonds are to be written on AIA Document A312 instead of A311 A new Subparagraph 7.2 3 has been added, requiring that the bonds be dated on or after the date of the Contract. C. USING THE A701 FORM 2 1 Modifications Users are encouraged to consult an attorney before using the form. On publicly funded projects, this document may require modifica- tion with the assistance of legal counsel, particularly with respect to local, state or federal regulations governing the bidding process. Because it is designed for general usage, A701 does not provide all the information particular to specific projects required by pro- spective Bidders. Necessary additional information must be provided in the Advertisement or Invitation to Bid, in the Supplemen- tary Provisions provided for the Project or in a supplement to this document Consult AIA Document A521 Uniform Location of Subject Matter, to determine the proper locations for such information. Users are cautioned not to retype this document Besides being a violation of copyright, retyping eleminates one of the principal advantages of the standard documents. By merely reviewing the modifications to be made to a standard form document, parties familiar with that document can quickly understand the essence of the proposed relationship. Commercial exchanges are greatly expedited and simplified, good -faith dealing is encouraged, and otherwise latent clauses are exposed for scrutiny In this way con- tracting parties can more fairly measure their risks. Some provisions in AIA Document A701 are stated to be effective unless otherwise required in the Bidding Documents. If other requirements are desired, these must be stated in the Bidding Documents. Modifications to the General Conditions, wherever contained, should be carefully compared with the requirements of A701 Because A701 is not designed or intended for use as a Contract Document, provisions of this document intended to remain effective after execution of the Contract for Construction should be reflected in the Conditions of the Contract (General, Supplementary or Other Conditions). INSTRUCTION SHEET FOR AIA DOCUMENT A701 1987 EDITION AIA° THE AMERICAN INSTITUTE OF 4RCTIITECTS, 1735 NEW YORK AVENUE NW WASHINGTON, D.C. 20)06 H E A M E R IC AN 1 DEFINITIONS 2 BIDDER S REPRESENTATIONS 3 BIDDING DOCUMENTS 4 BIDDING PROCEDURES 5 CONSIDERATION OF BIDS AIA AIA Document A701 Instructions to Bidders 1987 EDITION TABLE OF ARTICLES CAUTION You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. Copyright 1970 1974, 1978, ©1987 by The American Institute of Architects, 1735 New York Avenue, N W Washington, D C. 20006 Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will be subject to legal prosecution. AIA DOCUMENT A701 INSTRUCTIONS TO BIDDERS FOURTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 I N S T I T U T E O F A R C H I T E C T S 6 POST BID INFORMATION 7 PERFORMANCE BOND AND PAYMENT BOND 8 FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A701 1987 1 ARTICLE 1 DEFINITIONS 1 1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding Requirements consist of the Advertisement or Invitation to Bid, Instructions to Bidders, Supplementary Instructions to Bidders, the bid form, and other sample bidding and contract forms. The pro- posed Contract Documents consist of the form of Agreement between the Owner and Contractor Conditions of the Con- tract (General, Supplementary and other Conditions), Draw- ings, Specifications and all Addenda issued prior to execution of the Contract. 1.2 Definitions set forth in the General Conditions of the Con- tract for Construction, AIA Document A201 or in other Con- tract Documents are applicable to the Bidding Documents. 1.3 Addenda are written or graphic instruments issued by the Architect prior to the execution of the Contract which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections. 1.4 A Bid is a complete and properly signed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents. 1.5 The Base Bid is the sum stated in the Bid for which the Bid- der offers to perform the Work described in the Bidding Docu- ments as the base, to which Work may be added or from which Work may be deleted for sums stated in Alternate Bids. 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from the amount of the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted. 1 7 A Unit Price is an amount stated in the Bid as a price per unit of measurement for materials, equipment or services or a portion of the Work as described in the Bidding Documents. 1.8 A Bidder is a person or entity who submits a Bid. 1.9 A Sub bidder is a person or entity who submits a bid to a Bidder for materials, equipment or labor for a portion of the Work. ARTICLE 2 BIDDER'S REPRESENTATIONS 2.1 The Bidder by making a Bid represents that. 2.1 1 The Bidder has read and understands the Bidding Docu- ments and the Bid is made in accordance therewith. 2.1.2 The Bidder has read and understands the Bidding Docu- ments or contract documents, to the extent that such docu- mentation relates to the Work for which the Bid is submitted, for other portions of the Project, if any being bid concurrently or presently under construction. 2.1.3 The Bidder has visited the site, become familiar with local conditions under which the Work is to be performed and INSTRUCTIONS TO BIDDERS AIA DOCUMENT A701 INSTRUCTIONS TO'BIDDERS FOURTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 has correlated the Bidder's personal observations with the requirements of the proposed Contract Documents. 2.1.4 The Bid is based upon the materials, equipment and sys- tems required by the Bidding Documents without exception. ARTICLE 3 BIDDING DOCUMENTS 3.1 COPIES 3.1 1 Bidders may obtain complete sets of the Bidding Docu- ments from the issuing office designated in the Advertisement or Invitation to Bid in the number and for the deposit sum, if any stated therein. The deposit will be refunded to Bidders who submit a bona fide Bid and return the Bidding Documents in good. condition within ten days after receipt of Bids. The cost of replacement of missing or damaged documents will be deducted from the deposit. A Bidder receiving a Contract award may retain the Bidding Documents and the Bidder's deposit will be refunded. 3.1.2 Bidding Documents will not be issued directly to Sub bidders or others unless specifically offered in the Advertise ment or Invitation to Bid, or in supplementary instructions to bidders. 3.1.3 Bidders shall use complete sets of Bidding Documents in preparing Bids; neither the Owner nor Architect assumes responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 3.1.4 In making copies of the Bidding Documents available on the above terms, the Owner and the Architect do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant permission for any other use of the Bidding Documents. 3.2 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS 3.2.1 The Bidder shall carefully study and compare the Bid- ding Documents with each other and with other work being bid concurrently or presently under construction to the extent that it relates to the Work for which the Bid is submitted, shall examine the site and local conditions, and shall at once report to the Architect errors, inconsistencies or ambiguities discovered. 3.2.2 Bidders and Sub bidders requiring clarification or inter pretation of the Bidding Documents shall make a written request which shall reach the Architect at least seven days prior to the date for receipt of Bids. 3.2.3 Interpretations, corrections and changes of the Bidding Documents will be made by Addendum. Interpretations, cor rections and changes of the Bidding Documents made in any other manner will not be binding, and Bidders shall not rely upon them. 3.3 SUBSTITUTIONS 3.3.1 The materials, products and equipment described in the Bidding Documents establish a standard of required function, WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A701 1987 2 dimension, appearance and quality to'be met by any proposed substitution. 3.3.2 No substitution will be considered prior to receipt of Bids unless written request for approval has been received by the Architect at least ten days prior to the date for receipt of Bids. Such requests shall include the name of the :material or equipment for which it is to be substituted and a complete description of the proposed substitution including drawings, performance and test data, and other information necessary for an evaluation. A statement setting forth changes in other mate rials, equipment or other portions of the Work including changes in the work of other contracts that incorporation of the proposed substitution would require shall be included. The burden of proof of the merit of the proposed substitution is upon the proposer The Architect's decision of approval or dis- approval of a proposed substitution shall be final. 3.3.3 If the Architect approves a proposed substitution prior to receipt of Bids, such approval will be set forth in an Adden- dum. Bidders shall not rely upon approvals made in any other manner 3.3.4 No substitutions will be considered after the Contract award unless specifically provided in the Contract Documents. 3.4 ADDENDA 3.4.1 Addenda will be mailed or delivered to all who are known by the issuing office to have received a complete set of Bidding Documents. 3.4.2 Copies of Addenda will be made available for inspection wherever Bidding Documents are on file for that purpose. 3.4.3 No Addenda will be issued later than four days prior to the date for receipt of Bids except an Addendum withdrawing the request for Bids or one which includes postponement of the date for receipt of Bids. 3.4.4 Each Bidder shall ascertain prior to submitting a Bid that the Bidder has received all Addenda issued, and the Bidder shall acknowledge their receipt in the Bid. 4.1 FORM AND STYLE OF BIDS 4.1 1 Bids shall be submitted on forms identical to the form included with the Bidding Documents. 4.1.2 All blanks on the bid form shall be filled in by typewriter or manually in ink. 4.1.3 Where so indicated by the makeup of the bid form, sums shall be expressed in both words and figures, and in case of dis- crepancy between the two the amount written in words shall govern. 4.1.4 Interlineations, alterations and erasures must be initialed by the signer of the Bid. 4.1.5 All requested Alternates shall be bid. If no change in the Base Bid is required, enter 'No Change. 4.1.6 Where two or more Bids for designated portions of the Work have been requested, the Bidder may without forfeiture 3 A701 1987 ARTICLE 4 BIDDING PROCEDURES of the bid security state the Bidder's refusal to accept award of less than the combination of Bids stipulated by the Bidder The Bidder shall make no additional stipulations on the bid form nor qualify the Bid in any other manner 4.1 7 Each copy of the Bid shall include the legal name of the Bidder and a statement that the Bidder is a sole proprietor part nership corporation or other legal entity Each copy shall be signed by the person or persons legally authorized to bind the Bidder to a contract. A Bid by a corporation shall further give the.state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached certifying the agent s authority to bind the Bidder 4.2 BID SECURITY 4.2.1 If so stipulated in the Advertisement or Invitation to Bid, or supplementary instructions to bidders, each Bid shall be accompanied by a bid security in the form and amount required, pledging that the Bidder will enter into a Contract with the Owner on the terms stated in the Bid and will, if required, furnish bonds covering the faithful performance of the Contract and payment of all obligations arising thereunder Should the Bidder refuse to enter into such Contract or fail to furnish such bonds if required, the arnount of the bid security shall be forfeited to the Owner as liquidated damages, not as a penalty The amount of the bid security shall norbe forfeited to the Owner in the event the Owner fails to comply with Sub- paragraph 6.2 1 4.2.2 If a surety bond is required, it shall 'be written on AIA Document A310 Bid Bond, unless otherwise provided in the Bidding Documents, and the attorney -in -fact who executes the .bond on behalf of the surety shall affix to the bond a certified and current copy of the power of attorney 4.2.3 The Owner will have the right to retain the bid security of Bidders to whom an award is being considered until either (a) the Contract has been executed and bonds, if required, have been furnished, or (b) the specified time has elapsed so that Bids may be withdrawn, or (c) all Bids have been rejected. 4.3 SUBMISSION OF BIDS 4.3.1 All copies of the Bid, the bid security if any and other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope. The envelope shall be addressed to the party receiving the Bids and shall be identified with the Project name, the Bidder's name and address and, if applicable, the designated portion of the Work for which the Bid is submitted. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the nota- tion `SEALED BID ENCLOSED on the face thereof. 4.3.2 Bids shall -be deposited at the designated location prior to the time and date for receipt of Bids. Bids received after the time and date for receipt of Bids will be returned unopened. 4.3.3 'The Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 4.3.4 Oral, telephonic or telegraphic Bids are invalid and will not receive consideration. 4.4 MODIFICATION OR WITHDRAWAL OF BID 4.4.1 A Bid may not be modified, withdrawn or canceled by the Bidder during the stipulated time period following the time AIA DOCUMENT A701 INSTRUCTIONS TO BIDDERS FOURTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. and date designated for the receipt of Bids, and each Bidder so agrees in submitting a Bid. 4.4.2 Prior to the time and date designated for receipt of Bids, a Bid submitted may be modified or withdrawn by notice to the party receiving Bids at the place designated for receipt of Bids. Such notice shall be in writing over the signature of the Bidder or by telegram, if by telegram, written confirmation over the signature of the Bidder shall be mailed and postmarked on or before the date and time set for receipt of Bids. A change shall be so worded as not to reveal the amount of the original Bid. 4.4.3 Withdrawn Bids may be resubmitted up to the date and time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 4.4.4 Bid security if required, shall be in an amount sufficient for the Bid as modified or resubmitted. 5.1 OPENING OF BIDS ARTICLE 5 CONSIDERATION OF BIDS 5.1 1 Unless stated otherwise in the Advertisement or Invita- tion to Bid, the properly identified Bids received on time will be opened publicly and will be read aloud. An abstract of the Bids will be made available to Bidders. When it has been stated that Bids will be opened privately an abstract of the same infor mation may at the discretion of the Owner be made available to the Bidders within a reasonable time. 5.2 REJECTION OF BIDS 5.2.1 The Owner shall have the right to reject any or all Bids, reject a Bid not accompanied by a required bid security or by other data required by the Bidding Documents, or reject a Bid which is in any way incomplete or irregular 5.3 ACCEPTANCE OF BID (AWARD) 5.3.1 It is the intent of the Owner to award a Contract to the lowest responsible Bidder provided the Bid has been submitted in accordance with the requirements of the Bidding Documents and does not exceed the funds available The Owner shall have the right to waive informalities or irregularities in a Bid received and to accept the Bid which, in the Owner's judgment, is in the Owner's own best interests. 5.3.2 The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically pro- vided in the Bidding Documents, and to determine the low Bid- der on the basis of the sum of the Base Bid and Alternates ac cepted. ARTICLE 6 POST -BID INFORMATION 6.1 CONTRACTOR'S QUALIFICATION STATEMENT 6.1 1 Bidders to whom award of a Contract is under con- sideration shall submit to the Architect, upon request, a prop- erly executed AIA Document A305 Contractor's Qualification Statement, unless such a Statement has been previously AIkDOCUMENT A701 INSTRUCTIONS TO BIDDERS FOURTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D.C. 20006 required and submitted as a prerequisite to the issuance of Bid- ding Documents, 6.2 OWNER'S FINANCIAL CAPABILITY 6.2.1. The Owner shall, at the request of the Bidder to whom award of a Contract is under consideration and no later than seven days prior to the expiration of the time for withdrawal of Bids, furnish to the Bidder reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. Unless such reasonable evidence is fur nished, the Bidder will not be required to execute the Agree merit between the Owner and Contractor 6.3 SUBMITTALS 6.3.1 The Bidder shall, as soon as practicable after notification of selection for the award of a Contract, furnish to the Owner through the Architect in writing: 1 a designation of the Work to be performed with the Bidder's own forces, .2 names of the manufacturers, products and the sup- pliers of principal items or systems of materials and equipment proposed for the Work, and .3 names of persons or entities (including those who are to furnish materials or equipment fabricated to a special design) proposed for the principal portions of the Work. 6.3.2 The Bidder will be required to establish to the satisfac tion of the Architect and Owner the reliability and responsibil- ity of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents. 6.3.3 Prior to the award of the Contract, the Architect will notify the Bidder in writing if either the Owner or Architect, after due investigation, has reasonable objection to a person or entity proposed by the Bidder If the Owner or Architect has reasonable objection to a proposed person or entity the Bidder may at the Bidder's option, (1) withdraw the Bid, or (2) submit an acceptable substitute person or entity with an adjustment in the Base Bid or Alternate Bid to cover the difference in cost occasioned by such substitution. The Owner may accept the adjusted bid price or disqualify the Bidder In the event of either withdrawal or disqualification, bid security will not be forfeited. 6.3.4 Persons and entities proposed by the Bidder and to whom the Owner and Architect have made no reasonable objection must be used on the Work for which they were pro- posed and shall not be changed except with the written con- sent of the Owner and Architect. ARTICLE 7 PERFORMANCE BOND AND PAYMENT BOND 7 1 BOND REQUIREMENTS 7 1 1 If stipulated in the Bidding Documents, the Bidder shall furnish bonds covering the faithful performance of the Con- tract and payment of all obligations arising thereunder Bonds may be secured through the Bidder's usual sources. 7 1.2 If the furnishing of such bonds is stipulated in the Bid- ding Documents, the cost shall be included in the Bid. If the WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A701 1987 4 furnishing of such bonds is required after receipt of bids and before execution of the Contract, the cost of such bonds shall be added to the Bid in determining the Contract Sum. 7 1.3 If the Owner requires that bonds be secured from other than the Bidder's usual sources, changes in cost will be adjusted as' provided in the Contract Documents. 7.2 TIME OF DELIVERY AND FORM OF BONDS 7.2.1 The Bidder shall deliver the required bonds to the Owner not later than three days following the date of execution of the Contract. If the Work is to be commenced prior thereto in response to a letter of intent, the Bidder shall, prior to com- mencement of the Work, submit evidence satisfactory to the Owner that such bonds will be furnished and delivered in accordance with this Subparagraph 7.2 1 7.2.2 Unless otherwise provided, the bonds shall be written on AIA Document A312 Performance, Bond and Payment Bond. Both bonds shall be written in the amount of the Con- tract Sum. 5 A701 1987 7.2.3 The bonds shall be dated on or after the date of the Contract. 7.2.4 The Bidder shall require the attorney -in -fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of the power of attorney FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR 8.1 FORM TO BE USED ARTICLE 8 8.1 1 Unless otherwise required in the Bidding Documents, the Agreement for the Work will be written on AIA Document A101 Standard Form of Agreement Between Owner and Con- tractor Where the Basis of Payment Is a Stipulated Sum. AIA DOCUMENT A701 INSTRUCTIONS TO BIDDERS FOURTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. to Printed on Recycled Paper 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS ARTICLE 9: SUPPLEMENTARY INSTRUCTIONS THE FOLLOWING MODIFICATIONS APPLY TO THE PRECEDING ARTICLES: ADDITIONAL INSTRUCTIONS ARE AS FOLLOWS: SECTION 00100 PAGE 1 INSTRUCTIONS TO BIDDERS SUPPLEMENTARY INSTRUCTIONS Article 3.3 This article is expanded and modified by Division 1 of the Specifications. e Article 4.2 A Surety Company Bid Bond, AIA Document A310 or a State of Washington approved form, a certified check, cashier's check or postal money order payable to the order of the Commission of Clallam County Public Hospital District No. 2, Olympic Memorial Hospital, shall accompany each bid in an amount not less than five percent (5 of the aggregate of Basic Bid and all Additive Alternates. No bid shall be considered unless accompanied by such bid proposal security Article 4 4 1 No bidder may withdraw his bid after the hour set for the opening thereof, unless the award of the Contract is delayed for a period exceeding thirty (30) days. Article 5 1 1 Bid opening will be public. Article 6.3 This article is expanded and modified by the Supplementary Conditions and the General Requirements. Article 7 1 Delete Articles 7 1, 7 1 1, 7 1.2 and 7 1.3 and substitute the following: "The successful Contractor shall at the time of delivery of the executed Contract, furnish a duly executed bond upon a form, furnished or approved by the Owner, signed by two or more approved sureties or an approved surety company in the full amount of the contract price conditioned upon the faithful performance of the contract by the Contractor within the time prescribed therein. Such bond shall provide that the surety or sureties will agree to protect and indemnify the Owner against any direct or indirect loss that shall be suffered or claimed. a. The failure of the Contractor or any of the Contractor's employees, subcontractors or agents to faithfully perform the said contract, or b. The failure of the Contractor to pay all laborers, mechanics, subcontractors, agents, materialmen, and all persons who shall supply such Contractor subcontractor or agents with provisions or supplies for carrying on such work. At any time and as often as may be deemed necessary the Owner may require any or all sureties or any surety company to appear and qualify themselves upon the bond. Whenever such surety or sureties are deemed by the Owner to have become insufficient, the Owner may demand in writing that the Contractor furnish additional surety in an amount not exceeding that originally required as may be deemed necessary considering the work remaining to be done. No further payments will be made on the contract until such additional surety as required is furnished. Each form of bond must be approved in writing by the Owner The surety or sureties must be authorized to do business in the State of Washington and be satisfactory to the Owner 1 Mandatory Site Inspection. In addition to examination of the bid documents, each general contractor must examine the site; at the date and time specified below and so indicate on the bid form; and conduct such other examinations and investigations as are necessary to become MAHLUM NORDFORS McRINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 00100 PAGE 2 INSTRUCTIONS TO BIDDERS SUPPLEMENTARY INSTRUCTIONS fully informed of all existing or expected conditions and other matters that might in any way affect the cost or performance of the work. It is further recommended that each plumbing contractor, HVAC contractor, and electrical contractor attend the site inspection and likewise familiarize themselves with the existing conditions and access restrictions. The mandatory site inspection will be at 10 am on Thursday September 25 1997 0 1997 Mehhnn Nordfors McKinley Gordon END OF SECTION 00100 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 DESCRIPTION SECTION 00220 PAGE 1 GEOTECHNICAL DATA A. The following geotechnical engineering report is provided for information to bidders: 1 Geotechnical Recommendations for Proposed Additions to the Olympic Memorial Hospital, Port Angeles, Washington, dated March 11, 1997 B The report was prepared during the design phase of the project. Review contract drawings for exact building and site plan configurations. C. Owner not responsible for variations at locations other than those given or for changes after test pits were excavated. D For the Bidder's convenience, the complete report is reproduced hereinafter 1.3 BIDDER'S RESPONSIBILITY A. Bidder agrees to the following provisions: 1 Bidders shall examine the complete report reproduced hereinafter 2. The Owner does not represent that the available records show completely the existing conditions and does not guarantee any interpretation of these records or the correctness of any information shown on drawings relative to subsurface conditions. Bidders must assume all responsibility for deductions and conclusions which may be made by them as to the nature of the materials to be encountered, the difficulties of making and maintaining required excavations, and of doing other work which may be affected by soil and geological conditions at the site of the work. 3 Failure to make on -site examinations shall not relieve the bidder from entering into a contract nor excuse him from performing the work in strict accordance with the terms of the contract and the specifications. He will not be entitled to additional compensation if he subsequently finds the conditions to require other methods or equipment than those he anticipated in his bid. 4 Any oral statement or representation made by an officer agent, or employee of the Owner with respect to the physical condition appertaining to the site of the work shall not be binding upon the Owner 01997 Mahlum Nordfors McKinley Gordon END OF SECTION 00220 NTI NORTHWESTERN TERRITORIES, INC. Engineers Land Surveyors Planners Construction Coordination Materials Testing GEOTECHNICAL RECOMMENDATIONS FOR PROPOSED ADDITIONS TO THE OLYMPIC MEMORIAL HOSPITAL PORT ANGELES, WASHINGTON Olympic Memorial Hospital Prepared by Northwestern Territories, Inc. March 11, 1997 Prepared for 717 SOUTH PEABODY PORT ANGELES, WA 98362 (360) 452 -8491 1- 800 654 -5545 FAX 452 -8498 GENERAL GEOTECHNICAL RECOMMENDATIONS FOR PROPOSED ADDITIONS TO OLYMPIC MEMORIAL HOSPITAL This report hat been prepared at the request of Mr Mike Glenn of Olympic Memorial Hospital in accordance with our proposal dated February 19, 1997 The purpose of the report is to summarize the findings of previous investigations as they relate to the proposed additions, and to make geotechnical recommendations that will enable the Architect and Foundation Engineer to perform their work. The proposed additions are relatively small and since existing borings are very near the proposed additions and soils conditions are relatively consistent on the site, it was agreed that further investigations would not be necessary for this project. Therefore, the report is based upon existing geotechnical borings located near the proposed additions. No new soils borings or excavations were performed. SITE AND PROJECT DESCRIPTION The existing Olympic Memorial Hospital is located on Suburban Block 33 in the Townsite of Port Angeles. The two proposed additions are shown on the attached floor plan of the Hospital and consist of a one story, 1,500 square foot structure on the east side of the hospital and a two story, 2,500 square foot structure on the north side of the structure For the purposes of this report we have identified these as the "East Addition and the 'North Addition" The proposed location of the East Addition is currently occupied by a courtyard with pre- cast concrete walls, and planters and a cast in place slab on grade. Review of the 1989, Phase IV expansion drawings indicate that all footings, including the footing under the planters and dividers in the courtyard, were placed on compacted fill due to poor soil conditions in the upper 5 feet in this area. Our understanding is that the East Addition will be constructed upon a slab on grade with standard spread footings planned. The proposed location of the North Addition is currently paved with asphalt and serves as a small parking area. Review of the 1982 expansion drawings indicate that there is a utility corridor at the basement level to the south, and immediately adjacent to the proposed addition. Some utility conflicts were identified during the "as- built" plans review An abandoned steam and condensate return line run under the proposed additional as well as a propane gas line and some minor water lines. A major underground electrical line is located to the north of the addition. We understand that the north addition will consist of a slab on grade with spread footings. 1 Preliminary discussions with Dan Jardine Project Architect, indicate the soil bearing pressures on the order of 2,000 pounds per square foot are anticipated. SUMMARY OF PREVIOUS SOILS REPORTS Several previous geotechnical reports were reviewed and a summary is given below Copies of existing boring logs are included in Appendix B. 1970 Report by Dames Moore This is the first geotechnical report available for the hospital site. The report was prepared for the Northeast Wing which was constructed with a basement. The report was prepared in two phases. The first phase was a visual inspection of the bluff face and discussed the geology, drainage considerations and the stability of the bluff The second phase described two 25 foot deep borings and made recommendations for construction. In phase one, Dames Moore described three soil groups. 0 -20 feet: Glacial outwash consisting of layered sand, sand and fine gravel, and silty sand 20-60 feet: Glacial till consisting of dense silty sand with gravel and cob- bles with perched water table 60 -75 feet: Interlayered sand and sand and fine gravel, similar but some- what more granular to the surface soils. The report explained that the permeable surface soils allow water to percolate down until it reaches the till where it is forced to move horizontally until it emerges at the bluff as springs and seepages. The bluff stability was described as basically stable, although a description was given of on -going substantial shallow sloughing. The sloughing was described as possibly being triggered by the construction of the railroad grade at the base of the bluff and being aggravated by the seepage zone which keeps weathered surface soils saturated. The report recommends that storm water runoff be directed away from the top of the bluff and that the hospital complex be served by storm drains. The report stated that the conditions at the time of the report did not represent an actively receding bluff or deep- seated stability problem. Phase two borings are shown in Appendix C of this report. Boring 2, 1970, is located immediately east of the proposed North Addition and encountered medium dense gravelly sand and silty sand from the first floor elevation down to 5 feet, dense sand from 5 to 7.5 2 feet, dense gravelly sand (water bearing) from 7.5 to 18.5 feet, and dense to very dense glacial till from 18.5 to 25 feet. Recommendations made included an allowable soil bearing pressure of 3,000 pounds per square foot for undisturbed till or sand, and use of 35 pounds per cubic foot equivalent fluid for the design of retaining walls with adequate drainage to prevent hydrostatic pressures. 1981 Report by Dames Moore This report was prepared for the Southwest Wing addition. The west half of the addition was constructed as a slab on grade and the east half with a full basement. The report describes six borings ranging in depth from 18 to 30 feet (please see copy of Dames Moore boring logs in Appendix C) The soils encountered were similar to that described in the 1970 report: medium dense sands, silty sands, and gravelly sands underlain by very dense glacial till. An allowable soil bearing pressures of 3,000 pounds per square foot was recommended for the surficial (non plastic) silty sandy soils, 8,000 psf for dense sands, and 20,000 psf for drilled piers founded in the very dense glacial till. Recommendations for lateral earth pressures included the use of a 60 pound per cubic foot equivalent fluid for relatively rigid walls not allowed to rotate, and 35 pcf for walls allowed to rotate 0.002 times their height. 1982 Report by Dames Moore This report was prepared for the Critical Care Wing on the northwest corner of the hospital complex. Construction included a full basement. Two additional borings were drilled to depths of 24 feet and 30 feet and encountered loose silty sand fill to a depth of 6 feet, silty fine sands from 6 feet to 10 feet, underlain by dense to very dense glacial till (please see copy of Dames Moore boring logs in Appendix C) Recommendations included an allowable soil bearing pressure of 20,000 pounds per square foot for drilled piers founded in dense glacial till in addition to an allowable shaft friction of 1,500 psf Specific recommendations for underpinning existing footings were also given. 1989 Report by Northwestern Territories This report addressed foundation treatment for the Phase IV expansion. Four new borings were drilled to evaluate the suitability for foundations and to correlate with previous boring information. The report found that soils encountered did correlate in 3 general to previous investigations. In general the soils consisted of stratified silty sands in the upper 15 feet, underlain by very compact glacial till. Boring D is located Just west of the proposed East Addition. Recommendations for foundations in non basement locations included an allowable soil bearing pressure of 4,000 pounds per square foot following excavation of 4 to 6 feet of plastic silty soils and backfilling with compacted crushed rock. An allowable soil bearing pressure of 4,000 to 6,000 pounds per square foot was recommended for foundations in basement areas founded on or directly above the till layer Recommendations for lateral earth pressures included a coefficient of friction of 0.6 for sand and gravel soils, and the use of a equivalent fluid of 67 pcf for walls designed for uat- rest"earth pressures (not allowed to rotate) Recommendations regarding drainage included installation of foundation drains connected to a tightline all the way to the base of the bluff or connection to an existing City storm drain system. 1997 SURFACE INVESTIGATION On February 27, 1997, Joseph E. Donisi, P E., and Jerry Newlin, P E., both of Northwestern Territories Inc. (NTI), conducted a visual inspection of surface conditions and reviewed all available construction plans. Please see Appendix A for photographs showing the site prior to construction of the proposed additions. East Addition The foundation details for the 1989 Phase IV expansion called for the plastic silty soils and /or fill to be over excavated to a depth of 4 to 6 feet or until firm soils were reached and then to be backfilled and compacted up to foundation level, followed by conventional foundations. Apparently all courtyard walls were constructed in this manner No settlement problems were noticed in the area of the proposed East Addition. No utilities were shown on the drawings that were available for review, however, we recommend that a more thorough search be performed by the civil design team. North Addition The south line of the proposed foundation will be directly above the north side of an existing basement corridor in the basement (see Appendix D for sketch) Backfill compaction records for soils behind (north of) the corridor retaining wall are not available The structure of the existing building above the corridor is constructed with reinforced 4 concrete girders and slabs supported upon square concrete columns extending to the basement level. The columns at the basement level are built into the retaining wall and are visible in the basement corridor The existing retaining wall will be affected by any Toads placed near the wall and above the basement level. Since the structure is proposed to include a slab on grade, this cannot be easily avoided. There are several piping systems located in the footprint of the proposed addition. There are no documents available regarding backfill compaction test results. Typically, unless special planning has been made for future additions, the backfill for utility trenches is usually not compacted to the level needed for support of foundations. Therefore, it must be assumed that the soils are relatively loose where backfill is encountered. Some settlement of the asphalt parking area and concrete sidewalk was noticed at the south- east corner of the proposed addition. This is likely due to insufficient compaction of the backfill for the retaining wall. CONCLUSIONS AND RECOMMENDATIONS Foundations East Addition Due to the presence of low strength foundation soils in the upper five feet, as shown on Boring D of the 1989 report, the soils underlying the foundations supporting the East Addition should be over excavated and replaced with compacted structural fill. This should be accomplished by the Contractor as follows. 1 Excavate under all proposed building foundations four to six feet or as needed to remove the upper fill material or plastic silty soils. The width of the excavation should be the sum of the footing width and one -half the excavation depth (see Appendix D for sketch) Prior to backfilling, call for an inspection to ensure that competent foundation soils have been reached Under no circumstances should workers enter an unshored trench that is more than 4 feet deep 2. Backfill the excavations in 8 inch lifts with structural fill or crushed rock. Compact each lift with a heavy vibratory roller or backhoe mounted "hoe pack" to 95% of the modified proctor density as described under the structural fill section below Call a qualified testing lab for compaction testing. 3. Construct the foundations in the standard manner along the top of the compacted structural fill 5 When constructed as described above, the footings may be designed using an allowable soil bearing pressure of 4,000 pounds per square foot. However, a minimum 18 inch wide footing should be provided. This procedure has been successfully utilized in many similar cases in the Port Angeles area and is more economical than other alternatives. North Addition Conventional footings may be supported on the undisturbed soils in this area and may be designed using the 3,000 pound per square foot allowable soil bearing pressure recommended in the Dames Moore Report. However, we anticipate that a substantial amount of the foundation for the North Addition will encounter loose backfill either against the retaining wall or in utility trenches. If disturbed soils are encountered, the foundation treatment described for the East Addition (over excavation and backfill) should be used resulting in an allowable soil bearing pressure of 4,000 psf Additional vertical loads placed in the backfill of the existing retaining wall will increase the lateral force on the wall. Therefore, the effect of these additional loads on the existing retaining wall should be evaluated (see the retaining wall section below) This will include the floor loads including slab weight as well as any footings that are placed within about 8 feet of the retaining wall. As an alternative, the footing loads could be transferred using the existing concrete columns extending to the basement level. This would reduce the load on the retaining wall backfill to the floor slab loads. Structural Fill Structural fill is to be used in the over excavation areas for the perimeter footings, interior footings and under the slab. Structural fill shall consist of well graded granular material with no more than five percent by weight retained on the 2 1/2 inch sieve and no more than five percent fines by weight passing the No. 200 sieve. The percentage passing the 200 sieve should be measured from that portion of the material passing the three quarter inch sieve Structural fill should be placed only upon firm native soils and should be compacted in 8 inch lifts at or near the optimum moisture content as determined by the Modified Proctor Test (ASTM D1557) The subgrade should be inspected by a qualified engineer or inspector prior to placement of any structural fill. The structural fill should be compact- ed to 95 percent of the maximum dry density as determined by the Modified Proctor Test (ASTM D1557) Samples of the structural fill should be submitted to a soils laboratory for sieve analysis and approval prior to excavation. Following approval of the sieve analysis, but prior to compaction work, a sample of the structural fill material should be submitted to a soils laboratory for proctor testing. A qualified engineer or inspector should be on 6 site during backfilling operations to provide documentation that adequate compaction is being performed. Slabs on Grade The building floors may be constructed as slabs -on grade atop a six -inch layer of structural fill compacted as described above. The subgrade should be compacted and must be in a firm unyielding condition prior to placement of structural fill. The slab subgrade should be observed by a qualified engineer or inspector prior to placement of the structural fill. Any soft areas should be over excavated, backfilled and compacted with structural fill. The structural fill should be tested for compaction prior to placement of the concrete slabs. In areas where moisture is undesirable, a vapor barrier should be placed beneath the slab Additionally, sand may be used in the final grading process to provide uniform support for the slab and to minimize damage to the vapor barrier Evaluation of Retaining Walls at the North Addition In order to evaluate the existing retaining wall to support additional lateral loads induced by the new footings and floor, the following soil design values are believed to be appropri- ate These are based upon sandy soils that are believed to be used for backfill during construction Equivalent fluid of 35 pcf for walls allowed to deflect at least 0 002 times the wall height (Active condition) Equivalent fluid of 67 pcf for walls not allowed to deflect at least 0.002 times the wall height (At -Rest condition) Coefficient of Sliding Friction 0.61 Allowable soil- bearing capacity 6,000 pounds per square foot An appropriate safety factor should be applied for the design of the retaining walls. We recommend using a safety factor of at least 1.5 for sliding and overturning The above design values do not include the effects of any hydrostatic pressures behind the wall and assume that no surcharge slopes or loads will be placed above the walls. If these conditions exist, then those pressures should be added to the lateral earth pressures during the design. Surcharge pressures at any point on a rigid wall may be modelled using the following equation 7 X h Where h horizontal unit pressure at any point on a rigid wall, in pounds per square foot. P applied vertical load from proposed footings in pounds. x horizontal distance from wall to load, in feet. y lateral distance from point to load, in feet. z vertical distance from point to load, in feet. R 1,4 +2 Drainage Considerations During Construction, all excavations should be rolled with a compactor as soon as possible to reduce the impact of rain on the exposed surface. Water should not be allowed to stand in any area where foundations, slabs or pavements are to be construct- ed. This can be accomplished by constructing excavations to slope to a low spot and installing a sump pump discharging to a storm drain Based upon the existing boring information, we do not expect the excavations to encounter a significant amount of groundwater We recommend the use of perforated footing drains at the base of all footings including retaining walls. These drains should be surrounded by at least six inches of washed drain rock. At the highest point, the invert of the drain should be at least as low as the bottom of the footing and it should be sloped for drainage All roof and surface water drains must be kept separate from the perforated footing drains. All drains should be connected to a storm drain system and special care should be taken to avoid surface water from running over the bluff or from saturating soils near the top of the bluff Excavation and Slopes In no case should excavation slopes be greater than the limits specified in local, state and national safety regulations. Temporary cuts up to a depth of four feet may be made vertical in unsaturated soils. For temporary slopes having a depth greater than four feet, 8 the cut should have an inclination no steeper than 1 1 (horizontal. vertical) All permanent slopes should have a maximum inclination of 2:1 (horizontal•vertical) Paving For Tight vehicle parking and access, we recommend two inches of Class B asphaltic concrete paving over four inches of crushed rock base (WSDOT 9- 03.9(3) The sub grade should be compacted and must be in a firm, unyielding condition prior to place- ment of crushed rock. The subgrade should also be observed by a qualified engineer or inspector prior to placement of the crushed rock. Any soft areas should be over excavated, backfilled and compacted with structural fill. For heavy truck loading, we recommend three inches of Class B asphaltic concrete paving over six inches of crushed rock base. Crushed rock should be compacted to 95 percent of the maximum dry density as determined by the Modified Proctor Test (ASTM D1557) Utility Trenches The native sands may be used for utility trench backfill provided they are not too wet. The soil should be placed and compacted at or near its optimum moisture content as determined by ASTM D1557 If the native sands are too wet to be compacted to 95 percent, then structural fill should be placed in the upper 12 inches of the trench and compacted to 95 percent. Seismic Considerations The site is located within Seismic Zone 3 as illustrated on Figure No. 16 -2 of the 1994 Uniform Building Code (UBC) In accordance with Table 16 -J of the 1994 UBC, the site soil profile is best represented by Profile Type S2. LIMITATIONS This report has been prepared for the exclusive use of Olympic Memorial Hospital and their consultants for this expansion project. The recommendations in the report apply only to the additions described in the report and they are not applicable to other areas. The recommendations contained in this report are based upon site conditions as they existed at the time of previous exploration borings and assume that the soils encountered in the test pits are representative of the subsurface soils found on the site of the proposed additions. During construction, if subsurface conditions are discovered that are signifi- cantly different from those shown on the exploration borings, NTI should be advised at once so that we can review the conditions and reconsider our recommen- 9 dations where necessary Unanticipated soil conditions are commonly encountered on construction sites, especially when the topography has been altered years ago by construction and grading activities. Such unexpected conditions frequently require that additional expenditures be made to attain a properly constructed project. We recommend that a contingency be established in the project budget and schedule to cover unexpect- ed conditions. The project was in the conceptual design stage when this report was prepared. We expect that further consultation regarding specific design elements will be necessary When the design has been finalized, we recommend that NTI be retained to review the final design drawings and specifications to see that our recommendations have been interpreted and implemented as intended. The scope of our services does not include services related to construction safety precautions and our recommendations are not intended to direct the contractor's methods, techniques, sequences or procedures except as specifically described in our report for consideration in design. We recommend that this report be included in the project contract documents for the information of the contractor Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted professional engineering and geologic principles and practice. This warranty is in lieu of all others, either expressed or implied. Joseph E. Donisi, P E. Civil Engineer J R. Jerry Newlin, P E. Principal Engineer 10 Appendix A Photographs of Existing Conditions LOCATION OF EAST ADDITION LOOKING NORTH TH LOCATION OF NOR ADDITION LOOKING SOUTH Appendix B Map Showing Location of Existing Geotechnical Borings 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 PROPOSED NORTH ADDITION 1 UNDERGROUND UT1LI11ES L 1 O r rf� ?Ns_ 4 ►L uuuoli1i!ui ING B -1 1981 4 4 i Pi" _i Lai WI 'ING 8 -6 198 r PP 1 BORING 1 1970 ,r, NTI BORING 2190 PIP co 0 LOCATIONS OF EXISTING BORINGS NG C 1989 D BORING 8 -2 BORING B -1 1982 1982 BORING A 1989 LOCATION NOT SHOWN D �6' -v 3-4 r -4 BORING 1985 NORTH PROPOSED /-EAST ADDMON f e i -4 BORING 13-3 19810 ST 3 LOBBY RING 1989 NG 8 -2 1981 30R1NG B -5 7 N ENT FIGURE 1 Appendix C Borings Repo 1 1 1 1 1 1 1 1 1 1 1 1 1 95 90 II.6 -ly A 30 85 30 1 16.38 -103 b g 80 102 18 48 -117 100 9 85 80 75 70 7 r 70 6r e 230 SM BROWNISH GRAY SILTY SANG WITH GRAVEL (VERY DENSE) (TILL) 10" 10.2X BORING COMPLETES 7 95 16 16 OX -107 5 98-120 KEY. 65 14 84 250 j AO" 7.9X-133 250 O' BORING I ELEVATION 2S s BROWN SM BROWN SI LL Y GRAM ND HITN I GA A V(l (L00SL) Ml MOTTLED BROWN AND GRAY SANDY SILT WITH OCCASIONAL SILTY CLAY AN0 SILTY SAND (ST111) WATER LEVEL 7 -7 -70 SW BROWN GRAVELLY SAND (DENSE) (WATER BEARING) BORING 2 S M r RE001SH 8804N SAND 01E01UM 0(1155) ELEVATION 97 t 2' ASPHALT 4' BROWNISH GRAY GRAVELLY SAND YELLOWISH BROWN SILTY SAND (MEOIUM DENSE) SP REDDISH BROWN SAND (DENSE) SW BROWN GRAVELLY SAND (DENSE) WATER LEVEL 7 7 70 WATER SEARING MOTTLED BROWN AND GRAY SILTY GRAVELLY SAND WITH OCCASIONAL SILTY CLAY (DENSE) (WEATHERED TILL) SM BROWNISH GRAY SILTY SAND WITH GRAVEL (VERY DENSE) (TILL) BORING COMPLETED 7 -7 -70 BLOWS REQUIRED TO DRIVE SAMPLER ONE FOOT MOISTURE 1WEIGHT 180 LOS STROKE 30 INCHES CONTEN 145 5 9X 1 1 20 INDICATES DEPTH AT WHICH UNDISTURBED DRY SAMPLE WAS EXTRACTED DENSITY IN PCF O INDICATES DEPTH OF SAMPLING ATTEMPT WITH NO RECOVERY THE DISCUSSION IN THE TEXT OF THIS REPORT IS NECESSARY TO A PROPER UNDERSTANDING OF THE NATURE OF THE SUg59RFACE MATERIALS LOG OF BORINGS S' B7iAM�1a B MOORS• ems• ter- s 14.!11 71.70 106 in 1• $YJ ••I••^ AAA AM ELEVATION M.0' MOWN SILTY FMC 10 MEDIUM SAND AND DANN MOWN SILT AND SAND WIN A TRACE \,Q[01GANCS ♦OOM)(eu.0 M mown TINE $LTY SATO (M06TKM1OLW twins (VAT 10N 13 5► •1NOwN 0N1[ SA10 WITS A TIACI Of SLT 3Y (M06TMA1[001MNW) SP LM BORING 1 GRADES WITH LIST SLT 110WN SLTY GMVILLY RA1O (MO6TKVIfY D1NS1•GLACW TILL) 1011NG COWLRID 13 -37-10 M[ ZOMt1(o IN STALLID TO 11' OITN NO GIOVPO WATER O1S(IVID BORING 2 N SILTY SAND (TILL) MOTILIO IJSTY MOWN AND MOWN SANDY curly SILT (WIT) YCO•O LESS CLAYEY wrtN DtT'TN MOWN VERY SILTY TIM TO •LOUM SAND WTTN NON STAINS (WITXMfDNJJ• DONSI) MOWN 0134 TO AC/RP SAND wITN A TRACE Of SILT AND A TRACI Of NNE GRAVEL (M06T)N(NSO MOWN GRAVELLY SAND WITS A TRACE Of SILT (WET)pu'sQ MOWN GIAVILLY SILTY SAND WIN LENSES LY Of CL UM FINE TO COA(M LAND (MOIST TO W(TXV(RY DE16Q(GLACML TILL) IMMO COMPLITID 13 -7340 PILZOM(TU INSTALLED TO IT DERN GNOUPO WATTS um mammas AT 11.t DOTS ON 13-040 •ONS 4013310 TO SINE MMES AND M000 IAMF R PA FOOT WIN A NAMM* %MONT Of I25 011. APO A MAI Of 30 NCI3S. 341PCATU NM AT WNW IRO311. MID MAIM WAR I]GIACIO. INDICATES STANDA4 NNETRATION TEST USING IIAMMM WIIOM Of 140111. APO MOO Of 10 INCI3S. t 10 g IS S US.1 101 30 25 X 3 i b a.1% 13 40 LOG OF BORINGS ELEVATION PAP *WALT (0.t) AND SAND AND GRAVEL M I MOWN WOW NT WIN A TRACE Of s�Y 0sSNLY 061w1(0) SAL MOWN MOTTLED woo won STAINING VMY !ANDY SL1 pl0N41A$TIC*10I 1X IJM II' NNW T MOWN 0111 TO MEDUM SAND VIN H SOME Of SILT pO61XMIDLJM 0(341) MOWN LINE TO WORM SAND WITS L M1AC2 Of SLT +1001) MS1KML 00E13 111111Ql "nit BORING 3 MOWN GRAVELLY SAND WIN A MACS Of SLT (Yf1T)p116q TlY MOWN SILTY GIAVBLY SAND VMS 1.045 Of GRAN SANG APO NAVEL tN(T)CV1rY NAM SOOING COMLUID I3-?ip 01011140 WATER (t COUNIWD AT IY DEPTH BORING 4 ELEVATION 15.0' a L ASIIMIT (O.Y) AND SAND AND GNAW). Mil Lit 1NOWN SANDY SILT will SOME TINE SAND (NOM4LASTICX 4DUM NNW sY 1NOW14 Mt TO NEDR SILTY SAND 01061) INDIUM OOPS MOWN f*4 TO C0A1M SAND WON A TMCE ix Of SILT AND LAYERS Of NEVI 1AN0 (POST) prat TO VERY 0(16(3 8Y IgwN GRAVELLY SILTY SAPS (WESMISTY 013 613(0LAGMl 124 0031N0 CONTLITIO 11-35 01(2011(111 NSTALLED TO 11' owns 010U1O WATER LIVLL MAXI= AT IN OILS ON 9-3sa1 NOT& TN( DISCUSSION N NI TUT Of 1N3 WORT NICISANY POI A WPM LONDMI1APDNiO 00 MIN PNML1.01114 TU11131ACI YATIME1. B11/L.NS• 111 wort■ PLATE A —t 1 1 11 I1 M N• •I• I0• 0 R711— AA7 —AR 11111 m N NNW CO( GMVILLY SAM BORING 5 NATION 04.0' AVNALT (0.3104) SAND AND GAVIL IASI AK MOWN CLAM SANDY 1LT WITH A TMCI 0/ OIGANICS (MOST)(TO•SOL) MOWN NMI TO MIDUM SA/0 WITH A MCI •M Of 11.1(1•06T)p WIJM 0061 TO 0040 MOWN SILTY SAND WITH SOMI GMVIL (401ST)(VIUY DU61)(GLACIAL TILL, l0IING CONFUTED 11 -fl-0 G/OUND WATU NOT INCOUNTIUID ILIVATION 13.Y 1 jusyWALT (0.2') AND 3000 AND GAYS. M41 ML MOWN SANDY 111 WITH OSOANICS (WMT) r ILOOMWW M.111 L 11 IS tai 3'. lig wih 40• B• I0.4% LOG OF BORINGS 30• BORING 6 GAY NOTTLID WITH MOWN fWI ANDY 131 (WIT$OOSQ S► MOWN 1*6 TO MTDI)M SAND WITH A TMCI Of SILT AND LAVES Of IINI 14140 pIOST)(I18HUM 00413 MOWN f114 TO MEDIUM 100 WITH 111.611 Of 1111 TO COMM 31410 (NsT)Pv+4Q MOWN G44VII1Y 31410 1300ITWIN61) MOWN SLTY GAV111Y SAID tWUXVIIY $M DU•61)(GLACML TLy IK)11NG COAMLITID 12 -2340 G•OUND WATIA NOT NOTED IMOILMOMISI S .BOOS.. 1 PLATE A -2 PLASTID 1 IQ tz)Ex 1 S (L 5 7 p L I L i7 J SI r 1 E .J F1 AT E- 1 2. 1 lex=1 2F 1-11 1C)L-- 11 i. 11 Di v-- ti 34. Th o: 1. I 1 II t- ..,4 4 a -7, ic._, I k i if 4 -44.Prge?$41:N40441. Oi 0 P-1.-4 -i-- 1 1- I. -I------L-- 4 1 1 ---t f-.- -I —4 t» .1 1_1 i 1,_ #1-83 4t ea. 2 -Is -26 6 10/131 Io/Irl 111 ma citvin.a I 14P/20/b•1 s T R I DATE. 11-*-131 DESIGNED BY N p PROJECT .0-YM c 141— FOR i I (c7Lp plu) '1 L7 1 t-I -664.41E) r gF v\ip Dr_4=.p &12.4.■./e1-4-Y SAI-12 (vr=421- WA a6.e> r212 AK) 'NIG 5 NORTHWESTERN TERRITORIES, INC Enoinsen Land Surveyors Manners Construction Coordinstkn Materials Testing 717 SOUTH PEABODY PORT ANGELES. WASHINGTON 98362 1206) 452•491 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 IL t N J1T1 E s AW .a. I►vtre■"rE till .vA,413 #4i¢ 6 1 10 20 1 11 HpP {i2o1 14 _-IP i 13 22 1 1 10/196 IRATE. U ~0•S1 S P,T AN. R T DESIGNED BY N 2 PROJECT o(-YM PI G ME►N I41- FOR I •"4:1 I t-- t_. 6 1 1 50 8/119 .b- e //b SM 'ING c 1P1- .2 1 2 /e i J r' I 1 ri w4.1. me.P epow 5I1.--'ry S4-17- Q ./142-r gal 1f' 1 er 1'oM of 1-41-.8 (No HArre-R i bR 2 NORTHWESTERN TERRITORIES, INC Engineers Lind Surveyors Planners Construction Coordination Materials Testing 71? SOUTH PEAROOY PORT ANGELES, WASHINGTON 98362 (206) 4524491 1 Sf L r I e.S M #C20 #C22 4 Oc24- #c25 5 22/.94 I _1 G/123 11 /1o9 110 13// e:t.121Ni& 8 iv; T R DATE. II 6 DESIGNED BY N PROJECT i 4—YHA miag.409 1.41-- FOR NT1 Owl berm... 1 F ..fi-Frte,1121: ak_.*.!_emn 1.„ --t -4-- -1- I e7P-c% 4 (e:1 111-1) _1 I o I 4 c_,1206.vei_L,Y (1P-42%r e..11 45 GOAWI:L4 4- NORTHWESTERN TERRITORIES, INC Engineers Land brveyon Planners Construction Card:satin 'Midas Tieing 717 SOUTH PEABODY PORT ANEW. WASHINGTON 98382 (206) 452•491 1 4 pt_oss c- oex L L 37 F L I s r1 s A19 AF::"PRCk> -.4 I ilit 4.-. _l_a_4(L 'q Di i r 0 _La tt. i i 1.1 i D.: :.t 4 1 i .1 1 1 I 2 P7 L..L .4_1_:_. j_ I 1 1 W D8 i 1 .28/0 7 *011 1213 P 10 41Z Surtple Croo corn 1?gt2'1-10'Lr- tt IS 20 -20 O9 14//2 11/1” 10/118 1r_ A 4. ege i NIG CONIFI—G-1M19 10/00/61 8 T R 1, I DATE II DESIGNED BY H PROJECT G—YHA -4M'Q FOR R tirri 01.1 4 II II H. .1 4 Ft-ASTI Y SAN C) P fr.1.6cre.e 14 2 I 4 1 `4■1(, V l!,•' Pi2.414 I t•./ NORTHWESTERN TERRITORIES, INC Engineers UM Survoyors Moms Construction Coonfitufion Materials Testing 717 SOUTH PEABODY PORT ANGELES. WASHINGTON 93362 (206) 452•8491 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Appendix D Suggested Foundation Details 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 II II II 11 II 11 .II •.II II II H H n H II 11 H H 11= 11 11 -11- 11 11 -11= w T/2 H X11 11- 11-11 11 -1 11 H 11 11 11 11 H II W"P :11= II 11 11= 11 11 :11- 11 11 11 1 iI 11 11 11 II II H II II II II II II II 11= X11 11 11- 11 11 11 11-11 11 -11- 11 11- 11 11-11-1 -11:,,.11 H 11111111 I,,.II ,,.117.11.,,JI.,,:II H: TYPICAL FOUNDATION TREATMENT AT FlLL OR SOFT SOILS DOSTNG CONCRETE COLUMN BEYOND BASEMENT EWING CONCRETE COLUMN BEYOND EXISTING RETAINING WALL EXISTING NEW r PROPOSED ADD RION Vz iii 0 EXISTING RETAINING WALL AT NORTH ADDITON USE DETNL ABOVE FOR FOOTINGS LOCATED N DISTURBED SOILS UTILRY PIPES ANALYZE EXISTING RETAINING WALL FOR ADDRIONAL LOADS PLACED N SHADED AREA NTI SUPPORT ADDITION ON cosmic CONCRETE COLUMNS IF POSSIBLE TO REDUCE THE EFFECT ON THE EXISTING RETAINING WALL MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 THE PROJECT Olympic Memorial Hospital 2 Main/Surgery Additions Alterations 939 Caroline Street Port Angeles, Washington 1.2 THE DOCUMENTS 1.3 THE ARCHITECT Mahlum Nordfors McKinley Gordon 2505 Third Avenue, Suite 219 Seattle, Washington 98121 PART 2 THE BID SECTION 00300 PAGE 1 BID FORM The plans and specifications are entitled "Construction Documents for Olympic Memorial Hospital -2 Main/Surgery Additions Alterations To. Olympic Memorial Hospital 939 Caroline Street Port Angeles, Washington 98362 Ladies and Gentlemen. I/We have received the Project Specification for the project as identified above. I/We have also received Addenda Nos. and have included their provisions in my /our bid. I/We have attended the mandatory site inspection. Yes No (check one) I/We have examined both the documents and the site and fully understand the extent and nature of the work. Questions regarding the project have been asked of the Architect during the bidding period. I/We submit the following bid: In submitting this bid, I/We agree: 1 To hold my /our bid open for sixty (60) days. 2. To accept the provisions of the Advertisement to Bid and the Instructions to Bidders regarding disposition of Bid Security 3 To enter into and execute a contract, if awarded on the basis of this bid and to furnish guarantee bonds in accordance with the General and Supplementary Conditions of this contract. 4 To accomplish the work in accordance with the contract documents. 5 To complete the work by the time specified in Section 01011, Contract Time and Sequence. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION .00300 PAGE 2 BID FORM 6 The bids are in accordance with Section 01030, Base Bid and Alternates. 7 I/We have attached to this bid the required Bid Security and Bidder Qualification Form. I/We will construct this project for the lump -sum price of: DOLLARS None of the base bid or alternate prices include Washington State sales tax. Alternates (Not Used) Subcontractors I/We intend to use the following subcontractors for any and all portions of the work awarded. HVAC Subcontractor Plumbing Subcontractor Electrical Subcontractor Roofing Subcontractor In addition to the above, the following subcontractors have subcontract amounts equal to more than ten percent of the bid amount. 1 2. 3 4 NOTE. If such subcontractors are not listed below a list of their names must be submitted within one hour of the published bid submittal time. Failure to provide this list shall render the bid void. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDMONS ALTERATIONS Signatures (Date) (Signature) (Title) (Legal name of person, corporation, or firm submitting bid) (State Contractor's License Number) SECTION 00300 PAGE 3 BID FORM (Seal. If bid is by a corporation, signature must be as required in Section 00100, Instructions to Bidders.) 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 00300 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS KNOW ALL BY THESE PRESENT. That (Contractor) as principal, and (Bonding Company) as Surety a corporation of the State of whose principal office is located in the City of State of are firmly bound unto as Obligee, Dollars for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns jointly and securely firmly by these presents. WHEREAS, Principal has by written proposal, dated offered to enter into a contract with Obligee for SIGNED AND SEALED this NOW THEREFORE, the condition of this obligation is such that if the proposal of Principal is accepted by Obligee, Principal will pay to Obligee as liquidated damages a sum equal to five (5) percent of the amount of its bid unless within ten (10) days after delivery by Obligee to Principal of notice of acceptance of its proposal, Principal shall enter into a contract in accordance with its bid and furnish the Contractor's bond specified in said plans and specification sand contract documents. day of 19 (Surety) (Principal) (Title) (Title) 01997 Mahlum Nordfors McKinley Gordon SECTION 00320 PAGE 1 BID BOND END OF SECTION 00320 1 MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 INCORPORATION SECTION 00420 PAGE 1 BIDDER QUALIFICATION FORM The Owner's Qualification Form, three (3) pages, is incorporated hereafter as part of the Contract documents and shall be included with the bid form. Fill the following form out and submit along with the bid form. MAHLUM NORDFORS MclUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1. Type of organization: Individual Partnership Corporation 2. Years in business under present fine name: 3 Bonding Company Bonding Capacity• 4 Principal Bank: Branch. 5 Has your firm ever failed to complete any work awarded? 6 Has any officer or partner of your firm ever failed to complete a contract handled in his/her own name? If so, state name of individual, contract not completed, and why 7 List projects your organization has under way on this date: Contract Amount Class of Work Complete SECTION 00420 PAGE 2 BIDDER QUALIFICATION FORM Years Name and Address of Owner or Contracting Agent 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 8. List types of medical work completed in last five years: Contract Amount Class of Work Complete SECTION 00420 PAGE 3 BIDDER QUALIFICATION FORM Name and Address of Owner or Contracting Agent 9 List typical projects your organization has completed in the past three years: Contract Name and Address of Amount Class of Work Complete Owner or Contracting Agent MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 10 List any projects which resulted in substantial dispute with the Owner, arbitration, or litigation with the Owner or any subcontractors: Contract Name and Address of Amount Class of Work Complete Owner or Contracting Agent a 0 1997 Mahlum Nordfors McKinley Gordon SECTION 00420 PAGE 4 BIDDER QUALIFICATION FORM END OF SECTION 00420 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 INCORPORATION 1.2 DESCRIPTION A. Documents included in this section include: 1 AIA Document A101 (8 pages) 2. Supplementary Provisions (1 page) SECTION 00510 PAGE 1 FORM OF AGREEMENT AIA Document A101, Standard Form of Agreement Between Owner and Contractor where the Basis of Payment is a Stipulated Sum 1987 Edition, is hereby made a part of the Contract as modified by the Supplementary Conditions and is bound herein. 'INSTRUCTION SHEET FOR AIA DOCUMENT A101, STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR where the Basis of Payment is a STIPULATED SUM -1987 EDITION A. GENERAL INFORMATION 1 Purpose AIA Document A101 is intended for use on construction projects where the basis of payment is a stipulated sum (fixed price). It is suitable for any arrangement between the Owner and Contractor where the cost has been set in advance, either by bidding or by negotiation. 2. Related Documents This document has been prepared for use in conjunction with the 1987 edition of AIA Document A201 General Conditions of the Contract for Construction, which is adopted into A101 by a specific reference. This integrated set of documents is suitable for most projects; however for projects of limited scope, use of AIA Document A107 may be considered. The A101 document may be used as one part of the Contract Documents which record the Contract for Construction between the Owner and the Contractor The other Contract Documents are: General Conditions (i.e. A201) Supplementary Conditions Drawings Specifications Modifications Although the AIA does not produce standard documents for Supplementary Conditions, Drawings or Specifications, a variety of model and guide documents are available, including AIA s MASTERSPEC. 3. Arbitration This document incorporates ARBITRATION by adoption of AIA Document A201 which provides for arbitration according to the Construction Industry Arbitration Rules of the American Arbitration Association. Arbitration is BINDING AND MANDATORY in most states and under the federal Arbitration Act. In a minority of states, arbitration provisions relating to future disputes are not enforceable, but arbitration is enforceable if agreed to after the dispute arises. A few states require that the contracting parties be especially notified that the written contract contains an arbitration provision by a warning on the face of the document, specific placement of the arbitration provision within the document or specific discussions among the parties prior to signing the document. Arbitration provisions have been included in most AIA contract forms since 1888 in order to encourage alternative dispute resolu- tion procedures and to provide users of AIA documents with legally enforceable arbitration provisions when the parties choose to adopt arbitration into their contract. Individuals may however, choose to delete the arbitration provisions based upon their busi- ness decisions with the advice of counsel. To obtain a copy of the Construction Industry Arbitration Rules, write the American Arbitration Association, 140 West 51st Street, New York, NY 10020 4. Use of Non AIA Forms If a combination of AIA documents and non -AIA documents is to be used, particular care must be taken to achieve consistency of language and intent. Certain owners require the use of owner contractor agreements and other contract forms which they prepare. Such forms should be carefully compared with the standard AIA forms for which they are being substituted before execution of an agreement. If there are any significant omissions, additions or variances from the terms of the related standard AIA forms, both legal and insurance counsel should be consulted. 5. Letter Forms of Agreement Letter forms of agreement are generally discouraged by the AIA, as is the performance of a part or the whole of the Work on the basis of oral agreements or understandings. The standard AIA agreement forms have been developed through more than seventy five years of experience and have been tested repeatedly in the courts. In addition, the standard forms have been carefully coordin- ated with other AIA documents. 6. Use of Current Documents Prior to using any AIA document, the user should consult the AIA, an AIA component chapter or a current AIA Documents Price List to determine the current edition of each document. 7 Limited License for Reproduction AIA Document A101 is a copyrighted work and may not be reproduced or excerpted from in substantial part without the express written permission of the AIA. The A101 document is intended to be used as a consumable —that is, the original document pur chased by the user is intended to be consumed in the course of being used. There is no implied permission to reproduce this docu- ment, nor does membership in The American Institute of Architects confer any further rights to reproduce them. A limited license is hereby granted to retail purchasers to reproduce a maximum of ten copies of a completed or executed A101 but only for use in connection with a particular Project. A101 may not be reproduced for Project Manuals. Rather if a user wishes to INSTRUCTION SHEET FOR AIA DOCUMENT A101 1987 EDITION AIA° THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D.C. 20006 2 include it as an example in a Project Manual, the normal practice is to purchase a quantity of the pre printed forms and bind one in each of the Project Manuals. Partial modifications, if any may be accomplished without completing the form by using separate Sup- plementary Conditions. Upon reaching agreement concerning the Contract Sum and other conditions, the form may be removed from the manual and such information, except for the signatures, may be added to the blank spaces of the form. The user may then reproduce up to ten copies to facilitate the execution (signing) of multiple original copies of the form, or for other administrative purposes in connection with a particular Project. Please note that at least three original copies of A101 should be signed by the parties as required by the last provision of A101 B. CHANGES FROM THE PREVIOUS EDITION 1 Format Changes Two new articles have been added. Article 8, Termination or Suspension, and Article 9 Enumeration of Contract Documents. 2. Changes In Content The 1987 edition of A101 revises the 1977 edition to reflect changes made in the most recent (1987) edition of A201 It incor porates alterations proposed by architects, contractors, owners and professional consultants. The following are some of the signifi- cant changes made to the contents from the 1977 edition of A101 Article 1 A specific statement has been added that the Contract represents the entire agreement between the parties, supersed- ing previous negotiations and writings. Article 2: Space has been provided to describe any exceptions to the description of Contractor's scope of Work. Article 3: In the title of this article, `Time of Commencement has been changed to `Date of Commencement. Article 4: Space has been provided for insertion of the amounts relating to alternates and unit prices. Article 5: The Progress Payments article has been substantially rewritten and expanded. Detailed directions have been added on how and when payments shall be calculated and applied for Article 6: Further details have been added to clarify the conditions under which final payment shall be made by the Owner Article 7• The reference to definitions contained in the Conditions of the Contract has been deleted because the A201 docu- ment is now specifically adopted by reference under Article 9 Article 8: This is a new article containing references to the General Conditions. Article 9: This article is new The A101 Document and the A201 Document are explicitly enumerated as parts of the Contract Documents. Spaces are provided for information specifically identifying the other Contract Documents, including the Supple mentary Conditions, Specifications, Drawings and Addenda, if any Signature Page: It is noted above the signature lines that this agreement is executed on at least three original copies. See the instructions pertaining to Limited License for Reproduction. C. COMPLETING THE A101 FORM 1 Prospective bidders should be informed of any additional provisions which may be included in A101 such as liquidated damages or provisions for stored materials, by an appropriate notice in the Bidding Documents and the Supplementary Conditions. 2. Modifications Users are encouraged to consult an attorney before completing an AIA document. Particularly with respect to contractor's licensing laws, duties imposed by building codes, interest charges, arbitration and indemnification, this document may require modification with the assistance of legal counsel to fully comply with state or local laws regulating these matters. Generally necessary modifications may be accomplished by writing or typing the appropriate terms in the blank spaces provided on the form or by Supplementary Conditions, special conditions or amendments included in the Project Manual and referenced in this document. The form may also be modified by striking out language directly on the original pre printed form. Care must be taken in making these kinds of deletions, however Under NO circumstances should pre printed language be struck out in such a way as to render it illegible (as, for example, with blocking tape, correction fluid or X's that completely obscure the text). This may raise suspicions of fraudulent concealment or suggest that the completed and signed document has been tampered with. Handwrit ten changes should be initialed by both parties to the contract. It is definitely not recommended practice to retype the standard document. Besides being outside the limited license for reproduc tion granted under these Instructions, retyping can introduce typographical errors and cloud the legal interpretation given to a stan- dard clause when blended with modifications. Retyping eliminates one of the principal advantages of the standard form documents. By merely reviewing the modifications to be made to a standard form document, parties familiar with that document can quickly understand the essence of the proposed rela- tionship Commercial exchanges are greatly simplified and expedited, good -faith dealing is encouraged, and otherwise latent clauses are exposed for scrutiny In this way contracting parties can more fairly measure their risks. 3. Cover Page Date: The date represents the date the Agreement becomes effective. It may be the date that an oral agreement was reached, the date the Agreement was originally submitted to the owner the date authorizing action was taken or the date of actual execution. It INSTRUCTION SHEET FOR AIA DOCUMENT A101 1987 EDITION AIA® THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 HE A M E R IC AN AGREEMENT I N S T I T U T E O F A R C H I T E C T S AIA Document A101 Standard Form of Agreement Between Owner and Contractor THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES, CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION The 1987 Edition of AIA Document A201 General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified. This document has been approved and endorsed by The Associated General Contractors of America. made as of the Nineteen Hundred and BETWEEN the Owner (Name and address) where the basis of payment is a STIPULATED SUM 1987 EDITION and the Contractor (Name and address) The Project is (Name and location) The Architect is (Name and address) The Owner and Contractor agree as set forth below day of in the year of Copyright 1915 1918, 1925 1937, 1951 1958 1961 1963 1967 1974, 1977 ©1987 by The American Institute of Archi- tects, 1735 New York Avenue, N W Washington, D C. 20006. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will be subject to legal prosecution. AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 1987 1 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications, appears in Article 9 ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others, or as follows. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION 3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner (Insert the date of commencement, if it differs from the date of this Agreement or if applicable, state that the date will be fixed in a notice to proceed.) Unless the date of commencement is established by a notice to proceed issued by the Owner the Contractor shall notify the Owner in writing not less than five days commencing the Work to permit the timely filing of mortgages, mechanic s liens and other security interests. 3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than (Insert the calendar date or number of calendar days after the date of commencement. Also insert any requirements for earlier Substantial Completion of cer tain portions of the Work, if not stated elsewhere in the Contract Documents.) subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any for liquidated damages relating to failure to complete on time.) AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION ATA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 1987 2 ARTICLE 4 CONTRACT SUM 4.1 The Owner shall pay the Contractor in current funds for the Contractor's performance of the Contract the Contract Sum of Dollars subject to additions and deductions as provided in the Con- tract Documents. 4.2 The Contract Sum is based upon the following alternates, if any which are described in the Contract Documents and are hereby accepted by the Owner (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date until which that amount is valid.) 4.3 Unit prices, if any are as follows. AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 J WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 1987 3 5.1 Based upon Applications for Architect, the Owner shall make elsewhere in the Contract Docum 5.2 The period covered by each follows. ARTICLE 5 PROGRESS PAYMENTS Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the progress payments on account of the Contract Sum to the Contractor as provided below and ents. Application for Payment shall be one calendar month ending on the last day of the month, or as 5.3 Provided an Application for Payment is received by the Architect not later than the day of a month, the Owner shall make payment to the Contractor not later than the day of the month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than days after the Architect receives the Application for Payment. 5.4 Each Application for Payment shall be based upon the schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work and be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor s Applications for Payment. 5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows. 5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of percent Pending final determination of cost to the Owner of changes in the Work, amounts not in the dispute may be included as provided in Subparagraph 7 3 7 of the General Conditions even though the Contract Sum has not yet been adjusted by Change Order 5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or if approved in advance by the Owner suitably stored off the site at a location agreed upon in writing), less retainage of percent 5:6.3 Subtract the aggregate of previous payments made by the Owner and 5 6.4 Subtract amounts, if any for which the Architect has withheld or nullified a Certificate for Payment as provided in Para- graph 9 5 of the General Conditions 5 7 The progress payment amount determined in accordance with Paragraph 5 6 shall be further modified under the following circumstances 5.7 1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to percent of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims; and 5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the Contractor any additional amounts payable in accordance with Subparagraph 9 10 3 of the General Conditions. 5.8 Reduction or limitation of retainage, if any shall be as follows. (1/ it is intended. prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Subpara- graphs 5 6. and 5 6.2 above, and this is not explained e /sewbert. in the Contract Documents, insert here provisions for such reduction or limitation.) AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION AIA© ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 1987 4 ARTICLE 6 FINAL PAYMENT Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1) the Contract has been fully performed by the Contractor except for the Contractor's responsibility to correct nonconforming Work as provided in Subparagraph 12.2.2 of the General Conditions and to satisfy other requirements, if any which necessarily survive final payment, and (2) a final Certificate for Payment has been issued by the Architect, such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment, or as follows: ARTICLE 7 MISCELLANEOUS PROVISIONS 7 1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref erence refers to that provision as amended or supplemented by other provisions of the Contract Documents. 7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner s and Contractor s principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications, and also regarding requirements such as written disclosures or waivers.) 7.3 Other provisions. ARTICLE 8 TERMINATION OR SUSPENSION 8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions. 8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions. AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 1987 5 Document ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS 9 1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 9 1 1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor AIA Document A101 1987 Edition. 9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201 1987 Edition. 9 1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated and are as follows: Title Pages 9 1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9 1.3 and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Section Title Pages AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 1987 6 9 1.5 The Drawings are as follows, and are dated (Father list the Drawings here or refer to an exhibit attached to this Agreement Number Title 9.1.6 The addenda, if any are as follows Number AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. unless a different date is shown below Date Date Pages Portions of addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9 A101 1987 7 9 1 7 Other documents, if any forming part of the Contract Documents are as follows. (List here any additional documents which are intended to form part of the Contract Documents. The General Conditions provide that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor s bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) This Agreement is entered into as of the day and year first written above and is executed in at least three original copies of which one is to be delivered to the Contractor one to the Architect for use in the administration of the Contract, and the remainder to the Owner OWNER (Signature) (Printed name and title) AIA CONTRACTOR (Signature) (Printed name and title) CAUTION You should sign an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT A101 OWNER CONTRACTOR AGREEMENT TWELFTH EDITION AIM ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A101 1987 8 Printed on Recycled Paper Reprinted 10/93 will be the date from which the Contract Time is measured unless a different date is inserted under Paragraph 3 1 Identification of Parties. Parties to this Agreement should be identified using the full address and legal name under which the Agreement is to be executed, including a designation of the legal status of both parties (sole proprietorship partnership, joint ven- ture, unincorporated association, limited partnership or corporation [general, closed or professional], etc.). Where appropriate, a copy of the resolution authorizing the individual to act on behalf of the firm or entity should be attached. Project Description. The proposed Project should be described in sufficient detail to identify (1) the official name or title of the facility (2) the location of the site, if known, (3) the proposed building type and usage, and (4) the size, capacity or scope of the Project, if known. Architect. As in the other Contract Documents, the Architect's full legal or corporate titles should be used. 4. Article 1 The Contract Documents The Contract Documents must be enumerated in detail in Article 9 The Contractor's bid itself may be incorporated into the Con- tract, similarly other bidding documents, bonds, etc. may be incorporated, especially in public work. 5. Article 2 The Work of This Contract Portions of the Work which are the responsibility of persons other than the Contractor and which have not been otherwise indi- cated should be listed here. 6. Article 3 Date of Commencement and Substantial Completion The following items should be included as appropriate: Paragraph 3.1 The date of commencement of the Work should be inserted if it is different from the date of the Agreement. It should not be earlier than the date of execution (signing) of the Contract. After the first sentence, enter either the specific date of commencement of the Work, or if a notice to proceed is to be used, enter the sentence, `The date of commencement shall be stipulated by the notice to proceed. When time of performance is to be strictly enforced, the statement of starting time should be carefully weighed. Paragraph 3.2 The time within which Substantial Completion of the Work is to be achieved may be expressed as a number of days (preferably calendar days) or as a specified date. Any requirements for earlier Substantial Completion of portions of the Work should be entered here if not specified elsewhere in the Contract Documents. Also insert any provisions for liquidated damages relating to failure to complete on time. Liquidated damages are not a penalty. to be inflicted on the Contractor but must bear an actual and reasonably estimable relationship to the Owner's loss if construction is not completed on time. If liquidated damages are to be assessed because delayed construction will result in actual loss to the Owner the amount of damages due for each day lost should be entered in the Supplementary Conditions or the Agreement. Factors such as confidentiality or the need to inform Subcontractors about the amount of liquidated damages will help determine the location chosen. The provision for liquidated damages, which should be carefully reviewed or drafted by the Owner's attorney may be as follows: The Contractor and the Contractor's surety if any shall be liable for and shall pay the Owner the sums hereinafter stipulated as liquidated damages for each calendar day of delay until the Work is substantially complete: Dollars (8 For further information on liquidated damages, penalties and bonus provisions, see AIA Document A511 Guide for Supplementary Conditions, Paragraph 9 11 7 Article 4 Contract Sum Paragraph 4.1 Enter the Contract Sum payable to the Contractor Paragraph 4.2 Identify any alternates described in the Contract Documents and accepted by the Owner If decisions on alternates are to be made subsequent to execution of A101 attach a schedule showing the amount of each alternate and the date until which that amount is valid. Paragraph 4.3 Enter any unit prices, cash allowances or cash contingency allowances. If unit prices are not covered in greater detail elsewhere in the Contract Documents, the following provision for unit prices is suggested. The unit prices listed below shall determine the value of extra Work or changes in the Work, as applicable. They shall be con- sidered complete and shall include all material and equipment, labor installation costs, overhead and profit. Unit prices shall be used uniformly for additions or deductions. Specific allowances for overhead and profit on Change Orders may be included under this paragraph to forestall disputes over future Change Order costs. 8. Article 5— Progress Payments Paragraph 5.2 Insert the time period covered by each Application for Payment if it differs from the one given. INSTRUCTION SHEET FOR AIA DOCUMENT A101 1987 EDITION AIA° THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D.C. 20006 3 Paragraph 5.3 Insert the time schedule for presenting Applications for Payment. Insert the day of the month progress payments are due, indicating whether such day is to be in the same or the following month after receipt by the Architect of the relevant Application for Payment. The last day upon which Work may be included in an Application should normally be no less than 14 days prior to the payment date, in consideration of the 7 days required for the Architect's evaluation of an Application and issuance of a Certificate for Pay- ment and the time subsequently accorded the Owner to make payment in Article 9 of A201 The Contractor may prefer a few addi- tional days to prepare the Application. Due dates for payment should be acceptable to both the Owner and Contractor They should allow sufficient time for the Contrac tor to prepare an Application for Payment, for the Architect to certify payment, and for the Owner to make payment. They should also be in accordance with time limits established by this Article and Article 9 of A201 Subparagraph 5.6.1 Indicate the percent retainage, if any to be withheld when computing the amount of each progress payment. The Owner frequently pays the Contractor 90 percent of the earned sum when payments fall due, retaining 10 percent to ensure faithful performance. These percentages may vary with circumstances and localities. The AIA endorses the practice of reducing retainage as rapidly as possible, consistent with the continued protection of all affected parties. See AIA Document A511 Guide for Supplementary Conditions, for a complete discussion. Subparagraph 5.6.2 Insert any additional retainage to be withheld from that portion of the Contract Sum allocable to materials and equipment stored at the site. Payment for materials stored off the site should be provided for in a specific agreement and enumerated in Paragraph 7.3 Provi- sions regarding transportation to the site and insurance protecting Owner's interests should be included. Subparagraph 5.7 1 Enter the percentage of the Contract Sum to be paid to the Contractor upon Substantial Completion. Paragraph 5.8 Describe any arrangements to reduce or limit retainages indicated in Subparagraphs 5 6.1 and 5.6.2 if not explained elsewhere in the Contract Documents. A provision for reducing retainage should provide that the reduction will be made only if the Architect judges that the Work is pro- gressing satisfactorily If the Contractor has furnished a bond, demonstration of the surety s consent to reduction in or partial release of retainage must be provided before such reduction is effected. Use of AIA Document G707A is recommended. 9. Article 6 Final Payment Insert the date by which Owner shall make final payment, if it differs from the one stated. When final payment is requested, the Architect should ascertain that all claims have been settled or should define those which remain unsettled. The Architect should obtain the Contractor's certification required by Article 9 of A201 and must determine that, to the best of the Architect's knowledge and belief and according to final inspection, the requirements of the Contract have been fulfilled. 10. Article 7— Miscellaneous Provisions Paragraph 7.2 Enter any agreed upon interest rate due on overdue payments. Paragraph 7.3 Insert other provisions here. 11 Article 9 Enumeration of Contract Documents A detailed enumeration of all Contract Documents must be made in this Article. D. EXECUTION OF THE AGREEMENT 4 The Agreement should be executed in not less than triplicate by the Owner and the Contractor Each person executing the Agreement should indicate the capacity in which they are acting (i.e. president, secretary partner etc.) and the authority under which they are executing the Agreement. Where appropriate, a copy of the resolution authorizing the individual to act on behalf of the firm or entity should be attached. INSTRUCTION SHEET FOR AIA DOCUMENT A101 1987 EDITION AIA® THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D.C. 20006 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 2 SUPPLEMENTARY PROVISIONS SECTION 00510 PAGE 1 FORM OF AGREEMENT SUPPLEMENTARY PROVISIONS The following supplementary provisions modify change, delete from or add to the AIA Document A101, `Standard Form of Agreement Between Owner and Contractor where the Basis of Payment is a Stipulated Sum' 1987 Edition. Where any Article of the Form of Agreement is modified or deleted by these provisions ARTICLE 3: DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION Add the following Article: 3.2.3 Liauidated Damages: Owner and Contractor agree that should the project not be substantially completed within the time specified in the contract, that the damages sustained by the Owner or by the Contractor due to such delay will be assessed at five hundred dollars ($5001 Der day which is established as the liquidated damages which either the Contractor shall pay to the Owner, or the Owner shall pay to the Contractor, as the case may be, for each day's delay in completing the project beyond the time specified in this contract caused by the fault, error, act, change, or neglect of the other, its agents, employees or those acting for it. Refer to Paragraph 8.1.3 of the General Conditions for definitions of completion as referenced in this paragraph. The above amount will be used also for establishing the amount for "extended overhead" due to causes beyond the owner's control e.g. weather, unforeseen conditions, etc. ARTICLE 5: PROGRESS PAYMENTS Delete Paragraph 5.3 in entirety and add the following: 5.3 Provided an Application for Payment is received by the Architect not later than the last day of a month, the Owner shall make payment to the Contractor not later than the fifteenth of the following month. 5 6 1 Enter a value of 5 percent (5 for the percentage of retainage. 5 6.2 Enter a value of 5 percent (5 for the percentage of retainage. Add the following Article: 5 9 All monies retained will be deposited in an escrow account (in a bank or trust company chosen by Contractor and approved by Owner) and the interest earned in the account shall accrue to the benefit of the contractor until completion of contract. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 00510 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- CONTRACT TRANSMITTAL Date: To: From: Mahlum Nordfors McKinley Gordon 1.1 REFERENCE Section 00300, Bid Form, your proposal dated 1.2 OWNER'S ACTIONS The Owner authorizes us to advise you that he: Accepts/Rejects your base bid. Accepts your following alternates: Rejects your following alternates: 1.3 CONTRACT TRANSMITTAL The Owner forwards herewith for your signature his agreement with you per Section 00510 Form of Agreement. When the original and copies of the agreement are signed and dated, return the original and two copies to the Architect together with. Your payment bonds per Section 00510 Form of Agreement. Provide an original and two copies to the Architect, fully executed and signed. Your evidence of insurance coverage per Section 00700, General Conditions. Provide the completed original and two copies to the Architect. MAHLUM NORDFORS McKINLEY GORDON 0 1997 Mehlum Nordfors McKinley Gordon SECTION 00515 PAGE 1 CONTRACT TRANSMITTAL END OF SECTION 00515 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCHINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 NOTICE TO PROCEED Date: To: From. MAHLUM NORDFORS MCIQNLEY GORDON 1.1 REFERENCES A. Section 00300, Bid Form, your proposal dated. B. Section 00510 Form of Agreement, the contract dated: 1.2 OWNER'S DIRECTION The Owner has authorized us to direct you to commence and complete the work as follows: A. DATE OF COMMENCEMENT OF THE WORK FOR PHASE ONE is: and shall be the effective date of: 1 The specified insurance coverage 2. The contract, unless dated earlier 3 The performance and payment bond 4 The start of Phase One contract time of two hundred and twenty-five (225) calendar days SECTION 00520 PAGE 1 NOTICE TO PROCEED B DATE OF SUBSTANTIAL COMPLETION FOR PHASE ONE is and shall be the date of completion of all Phase One work except for deferred items, if any and shall be the effective start date of: 1 Liquidated damages at $500 00 per day (if project is not ready for owner's occupancy) 2. 30-day period to complete deferred items 3 Guarantees and warranties 4 Owner's occupancy 5 Owner's assumption of full responsibility for maintenance, heat, utilities, and insurance C. DATE OF COMMENCEMENT OF THE WORK FOR PHASE TWO is: and shall be the effective date of: 1 1 The specified insurance coverage 2. The contract, unless dated earlier 3 The performance and payment bond 4 The start of Phase Two contract time of one hundred and twenty-five (125) calendar days D DATE OF SUBSTANTIAL COMPLETION FOR PHASE TWO is and shall be the date of completion of all Phase Two work except for deferred items, if any and shall be the effective start date of: 1 Liquidated damages at $500 00 per day (if project is not ready for owner's occupancy) 2 30-day period to complete deferred items MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3 Guarantees and warranties 4 Owner's occupancy 5 Owner's assumption of full responsibility for maintenance, heat, utilities, and insurance E. DATE OF COMMENCEMENT OF THE WORK FOR PHASE THREE is: antl shall be the effective date of: 1 The specified insurance coverage 2. The contract, unless dated earlier 3 The performance and payment bond 4 The start of Phase Three contract time of one hundred and twenty-five (125) calendar days F DATE OF SUBSTANTIAL COMPLETION FOR PHASE THREE is and shall be the date of completion of all Phase Three work except for deferred items, if any and shall be the effective start date of: 1 Liquidated damages at $500 00 per day (if project is not ready for owner's occupancy) 2. 30-day period to complete deferred items 3 Guarantees and warranties 4 Owner's occupancy 5 Owner's assumption of full responsibility for maintenance, heat, utilities, and insurance 1.3 RECEIPT Please signify your receipt and acceptance of this Notice to Proceed in Part 2 below MAHLUM NORDFORS McKINLEY GORDON (by) (date) PART 2 CONTRACTOR'S ACCEPTANCE To MAHLUM NORDFORS McKINLEY GORDON This is to acknowledge receipt and acceptance of above Notice to Proceed. 1. The executed contract is attached, has been submitted. 2. Evidence of insurance coverage is attached, has been submitted. (Contractor) (by) O 1997 Mehlum Nordfors McKinley Gordon (date) SECTION 00520 PAGE 2 NOTICE TO PROCEED END OF SECTION 00520 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 INCORPORATION 1.2 DESCRIPTION A. Conditions of the Contract described in this section include: 1. General Conditions (24 pages) 2. Supplementary Conditions of the Contract (6 pages) 3 Special Conditions of the Contract (4 pages) SECTION 00700 PAGE 1 GENERAL CONDITIONS A. AIA Document A201 General Conditions of the Contract For Construction, 1987 Edition, is hereby made a part of the Contract as modified by the Supplementary General Conditions and is bound herein. INSTRUCTION SHEET FOR AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION -1987 Edition A. GENERAL INFORMATION 1 Purpose AIA Document A201, a general conditions forms, is intended to be used as one of the Contract Documents forming the Con- struction Contract In addition, it is frequently adopted by reference into a variety of other agreements, including the Owner Architect agreements and the Contractor Subcontractor agreements, in order to establish a common basis for the primary and secondary relationships on the typical construction project. 2. Related Documents The current edition of A201 is incorporated by specific reference into two AIA Owner Contractor agreements (A101 and A111) and several AIA Owner Architect agreements (B141, B151, B161 and B181) It may also be adopted by indirect reference when the prime Agreement between the Owner and Contractor is adopted into a Subcontract, such as AIA Document A401 or when the prime Agreement between the Owner and Architect is adopted into Architect Consultant agreements such as AIA Documents C141 C142 and C161 Such incorporation by reference is a valid legal drafting method, and documents so incorporated are generally interpreted as part of the respective contract. The Contract Documents, including A201, record the Contract for Construction between the Owner and Contractor. The other Contract Documents include: Owner Contractor Agreement Form (i.e. A101 or Alll) Supplementary and Other Conditions Drawings Specifications Modifications Also included in the Contract Documents are addenda issued prior to execution of the Contract and other documents listed in the Agreement. The A201 document is considered the keystone document coordinating the many parties involved in the construction process. As mentioned above and diagramed below, it is a vital document used to allocate the proper legal respon- sibilities of the parties. General Conditions Owner Contractor Contract Owner Architect Contract for Construction for Design and Administration Contractor Subcontractor Contract Architect Consultant Contract for a Portion of the Work for a Portion of the Services The AIA publishes other General Conditions that parallel A201 for the construction management family of documents (AIA Document A201 /CM) and the interiors family of documents (AIA Document A271) For certain federal projects, the AIA publishes Federal Supplementary Conditions (AIA Document A201 /SC) for use with A201 3. Arbitration The A201 document incorporates ARBITRATION according to the Construction Industry Arbitration Rules of the American Arbitration Association. Arbitration is BINDING AND MANDATORY in most states and under the federal Arbitration Act In a minority of states, arbitration provisions related to future disputes are not enforceable, but arbitration is enforceable if agreed to after the dispute arises. A few states require that the contracting parties be especially notified that the written contract con- tains an arbitration provision by a warning on the face of the document, specific placement of the arbitration provision within the document, or specific discussions among the parties prior to signing the document. Arbitration provisions have been included in most AIA contract forms since 1888 in order to encourage alternative dispute resolution procedures and to provide users of AIA documents with legally enforceable arbitration provisions when the parties choose to adopt arbitration into their contract. Individuals may however, choose to delete the arbitration provisions based upon their business decisions with the advice of counsel To obtain a copy of the Construction Industry Arbitration Rules, write to the American Arbitration Association,'140 West 51st St. New York, NY 10020 INSTRUCTION SHEET FOR AIA DOCUMENT A201 1987 EDITION AIA THE AMERICAN 1 INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D.C. 20006 4. Use of Non -AIA Forms If a combination of AIA documents and non -AIA documents is to be used, particular care must be taken to achieve consistency of language and intent. Certain owners require the use of owner contractor agreements with general conditions and other contract forms which they prepare. Such forms should be carefully compared with the standard AIA forms for which they are being substituted before execution of an agreement. If there are any significant omissions, additions or variances from the terms of the related standard AIA forms, both legal and insurance counsel should be consulted. 5. Use of Current Documents Prior to using any AIA document, the user should consult the AIA, an AIA component chapter or a current AIA Documents Price List to determine the current edition of each document. 6. Reproduction AIA Document A201 is a copyrighted work and may not be reproduced or excerpted from in substantial part without the express written permission of the AIA. The A201 document is intended to be used as a consumable —that is, the original docu- ment purchased by the user is intended to be consumed in the course of being used. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce them A201 may not be reproduced for Project Manuals. Rather, if a user wishes to include it in a Project Manual, the normal practice is to purchase a quantity of the pre printed forms and bind one in each of the Project Manuals. Modifications may be accom- plished through the use of separate Supplementary Conditions, such as those derived from AIA Document A511 Unlike the instruction sheets accompanying some AIA documents, this A201 Instruction Sheet does not include a license granting permission to reproduce the A201 document. AIA will not permit the reproduction of this document or the use of substantial portions of language from it, except upon written request and receipt of written permission from the AIA. B. CHANGES FROM THE PREVIOUS EDITION 2 1 Format Changes The provisions dealing with the rights and responsibilities of the Architect have been moved from Article 2 to Article 4 retitled Administration of the Contract, in order to focus on the Owner and the Contractor as the parties to the Construction Con- tract. Miscellaneous Provisions, formerly Article 7 is now Article 13 2. Changes in Content The 1987 edition of A201 revises the 1976 edition to reflect changes in construction industry practices and the law Comments and assistance in this revision were received from numerous individuals and organizations, including those representing owners, architects, engineers, specifiers, general contractors, subcontractors, sureties, attorneys and arbitrators. Substantial changes have been made to the A201 document. The principal changes are as follows. Article 3. Contractor Warranty The warranty provision now explicitly excludes damage or defect caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, and normal wear and tear under normal usage. Article 4. Administration of the Contract Review of Shop Drawings The provision governing architect's review of shop drawings has been expanded, and now requires that the architect be given sufficient time in his or her professional judgment to conduct an adequate review The general limitation on the purpose of the Architect's review to checking for conformance with the information given and the design concept expressed in the Contract Documents has been retained. In addition, language has been added specifically excluding purposes of checking details that are the responsibility of the Contractor. Claims and Disputes Provisions governing the handling of Claims and disputes have been expanded and brought together in a single paragraph to spell out procedures more clearly and sequentially diagrams of the Change Order and Claims pro- cesses may be found on the last page of this Instruction Sheet. In the interest of expediting arbitration proceedings, a notice of demand for arbitration is now required to include all causes of action then known to the party filing the demand. Limita- tions on consolidation or joinder in arbitration of the Architect or the Architect s employees or consultants have been retained. Delays Due to Adverse Weather Conditions Claims for delay due to adverse weather conditions must now be substan- tiated by data showing ihat such conditions were out of the ordinary and had an adverse effect on the scheduled construction. Article 5. Subcontractors Contingent Assignment of Subcontracts new provision assigns Subcontracts to the Owner in the event that the Con- tract is terminated, and also provides for adjustment of the Subcontractor's compensation if termination has resulted in suspension of the Work for more than 30 days. Both Owner and Subcontractors are thus given a measure of protection from the effects of termination. INSTRUCTION SHEET FOR AIA DOCUMENT A201 1987 EDITION AIA® THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW WASHINGTON, D.C. 20006 HE A M E R IC AN 1 GENERAL PROVISIONS 2 OWNER 3 CONTRACTOR 5 SUBCONTRACTORS 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 7 CHANGES IN THE WORK AIA I N S T I T U T E O F A R C H I T E C T S AIA Document A201 General Conditions of the Contract for Construction THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES, CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS MODIFICATION 1987 EDITION TABLE OF ARTICLES 8 TIME 9 PAYMENTS AND COMPLETION 10 PROTECTION OF PERSONS AND PROPERTY 4 ADMINISTRATION OF THE CONTRACT 11 INSURANCE AND BONDS 12 UNCOVERING AND CORRECTION OF WORK 13 MISCELLANEOUS PROVISIONS 14 TERMINATION OR SUSPENSION OF THE CONTRACT This document has been approved and endorsed by the Associated General Contractors of America. Copyright 1911 1915 1918, 1925 1937 1951 1958, 1961 1963 1966, 1967 1970 1976, ©1987 by The American Institute of Architects, 1735 New York Avenue, N W Washington, D C. 20006. Reproduction of the material herein or substantial quotation of its provisions without written permission of the AIA violates the copyright laws of the United States and will be subject to legal prosecutions. CAUTION You should use an original AIA document which has this caution printed in red. An original assures that changes will not be obscured as may occur when documents are reproduced. AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 1 Acceptance of Nonconforming Work '9.6.6, 9 9.3 12.3 Acceptance of Work 9 6.6, 9.8.2, 9 9.3 9 10 1 9 10.3 Access to Work 3.16, 6.2 1 12 1 Accident Prevention 4.2.3 10 Acts and Omissions 3.2 1 3.2.2 3.3.2 3 12.8, 3 18, 4.2.3 4.3.2, 4.39 8.31 101 4 10.25 134.2 137 141 Addenda 1 1 1 3 11 Additional Cost, Claims for 4.3.6, 4.3 7 4.3 9 6.1 1 10.3 Additional Inspections and Testing 4.2.6, 9.8.2 12.2 1 13 5 Additional Time, Claims for 4.3 6 4.3.8, 4.3 9 8.3.2 ADMINISTRATION OF THE CONTRACT 3.3.3 4, 9 4, 9 5 Advertisement or Invitation to Bid 1 1 1 Aesthetic Effect 4.2 13 4 5 1 Allowances 3.8 All -risk Insurance 11 3 1 1 Applications for Payment 4.2 5 7.3 7 9.2, 9.3, 9 4, 9 5 1 9.6.3 9.8.3 9 10 1 9 10.3 9 104 11 1.3 14.2 4 Approvals 2 4 3.3.3 3 5 3 10.2 3 12 4 through 3 12.8, 3 18.3 4.27 9.3.2 11.31 4 134.2 135 Arbitration 4 1 4, 4.3.2 4.3 4 4 4 4 4.5, 8.3 1 10 1.2 11.3 9 11 3 10 Architect 4.1 Architect, Definition of 4 1 1 Architect, Extent of Authority 2 4 3 12 6, 4.2 4:3.2 4.3 6, 4.4, 5.2 6.3 7 1.2 7.2 1 7.3 6 7 4 9.2 9.3 1 94 95 96.3 9.8.2 9.83 9 10 1 910.3 121 12.21 1351 135.2 14.2.2 14.24 Architect, Limitations of Authority and Responsibility 3 3 3 3 12.8, 3 12 11 41.2 4.21 4.2.2 4.2.3 4.26,4.27 4.210 4.212, 4.2 13 4.3.2 5.2 1 7 4, 9 4.2 9 6 4, 9.6.6 Architect s Additional Services and Expenses 2 4, 9.8.2, 11 31 1 12.2 1 12.24, 135.2 135.3 14.24 Architect's Administration of the Contract 4.2, 4.3 6, 437 44,94,95 Architect s Approvals 2 4 3 5 1 3 10.2 3 12.6, 3 12.8, 3 18.3 4.2 7 Architect s Authority to Reject Work 3 5 1 4.2 6, 12 1.2 12.2 1 Architect s Copyright 1.3 Architect s Decisions 4.2 6, 4.2 7 4.2 11 4.2 12 4.2 13 4.3.2 4 3 6, 4 4 1 4 4 4 4 5 6.3 7.3 6 7 3.8 8.1.3 8.3 1 9.2 9 4 9 5 1 9.8.2 9 9 1 10 1.2 13 5.2, 14.2.2, 14.2 4 Architect's Inspections 4.2.2 4.2 9 4.3 6, 9 4.2 9.8.2 9 9.2, 9 10 1 13 5 Architect s Instructions 4.2 6, 4.2 7 4.2.8 4.3 7 7 4 1 12.1 13 5.2 Architect s Interpretations 4.2 11 4.2 12, 4.3 7 Architect s On -Site Observations 4.2.2 4.2 5 4.3 6, 9 4.2, 951 9 10 1 135 Architect's Project Representative 4.2 10 Architect s Relationship with Contractor 1 1.2 3.2 1 3.2.2 3.33 351 37.3 311 312.8,31211 316 „318,4.23 4.24, 4.26,4.212 5.2 6.2.2 7.3 4, 9.8.2, 11 3 7 121 135 Architect s Relationship with Subcontractors 1 1.2 4.2.3 4.2 4 4.26,9.63 964 1137 Architect s Representations 9 4.2 9 5 1 9 10 1 Architect s Site Visits 4.2.2, 4.2 5 4.2 9 4.3.6, 9 4.2 9 5 1 9.8.2 9 9.2 9 10 1 13 5 Asbestos Attorneys Fees Award of Separate Contracts Award of Subcontracts and Other Contracts for Portions of the Work Basic Definitions Bidding Requirements Boiler and Machinery Insurance Bonds, Lien Bonds, Performance and Payment 2 A201 1987 3 18.1 10 1 9 10.2 10 1 4 6.1 1 5.2 11 111 117 5.21 114.1 11.3.2 9 10.2 7 3.6.4 9 10.3 11.3 9 11 4 INDEX Building Permit 3 7 1 Capitalization 1.4 Certificate of Substantial Completion 9.8.2 Certificates for Payment 4.2 5 4.2 9 9 3 3 9.4, 9 5 9 6.1 96.6, 971 9.8.3 9 10 1 910.3 137 14.1 1 3 14.24 Certificates of Inspection, Testing or Approval 3 12 11 13 5 4 Certificates of Insurance 9.3.2 9 10.2 11 1.3 Change Orders 1 1 1 2 4 1 3.8.2 4, 3 11 4.2.8, 4 3.3 5.2 3 7 1 7.2, 7.3.2 8.3 1 9.3 1 1 9 10.3 11 3 1.2 11.3 4, 11.3 9 12 1.2 Change Orders, Definition of 7.2 1 71 Changes CHANGES IN THE.WORK 3 11 4.2.8, 7 8.3 1 9.3 1 1 10 1.3 Claim, Definition of 4.3.1 Claims and Disputes 4.3, 4 4 4 5 6.2 5 8.3.2, 9.3 1.2 9.3 3 9 10 4, 10 1 4 Claims and Timely Assertion of Claims 4.5.6 Claims for Additional Cost 4 3 6 4.3.7 4 3 9 6.1 1 10.3 Claims for Additional Time 4.3 6 4.3.8, 4.3 9 8.3.2 Claims for Concealed or Unknown Conditions 4.3.6 Claims for Damages 3 18, 4 3 9 6 1 1 6.2 5 8.3.2 9 5 1.2 10 1 4 Claims Subject to Arbitration 4.3.2, 4.4 4, 4.5 1 Cleaning Up 3.15, 6.3 Commencement of Statutory Limitation Period 13.7 Commencement of the Work, Conditions Relating to 2 1.2, 2.2 1 3.2 1 3.2.2, 3 7 1 3 10 1 3 12 6, 4.3 7 5.2 1 6.2.2 8 1.2, 8.2.2 9.2 11 1 3 11.3 6, 11 4.1 Commencement of the Work, Definition of 8.1.2 Communications Facilitating Contract Administration 3 9 1 4.2 4 5.2.1 Completion, Conditions Relating to 3 11 .3 15 4.2.2 4.2 9 4.3.2 94.2 9.8, 991 910 11.35 12.2.2, 1371 COMPLETION, PAYMENTS AND 9 Completion, Substantial 4.2 9 4.3 5.2 8.1 1 8.1.3 8.2.3 9.8, 9 9 1 12.2.2 13 7 Compliance with Laws 1.3 3 6, 3 7 3 13 4 1 1 10.2.2 11 1 11.3 13 13 5 1 13 5.2 13.6, 14.1 1 14.2 1.3 Concealed or Unknown Conditions 4.3.6 Conditions of the Contract 1 1 1 1 1 7 6.1 1 Consent, Written 1 3 1 3 12:8, 3 14.2, 4 1.2 4 3 4 4 5 5 9.3.2 9.8.2 9 9 1 9 10.2, 9 10.3 10 1.2 10'1.3 11 3 1 11.3 1 4, 11 3 11 13.2 13 4.2 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 1 1 4, 6 Construction Change Directive, Definition of 7.3 1 Construction Change Directives 1 1 1 4.2.8, 7 1 7.3, 9.3 1 1 Construction Schedules, Contractor s 3 10, 6.1.3 Contingent Assignment of Subcontracts 5.4 Continuing Contract Performance 4.3.4 Contract, Definition of 1 1.2 CONTRACT TERMINATION OR. SUSPENSION OF THE 4.3 7 5 4 1 1 14 Contract Administration 3.3.3 4 9 4 9 5 Contract Award and Execution, Conditions Relating to 3 7 1 310 5.2 9.2 111.3 11.36 1141 Contract Documents, The 1 1 1.2, 7 Contract Documents, Copies Furnished and Use of 1.3 2.2 5 5.3 Contract Documents, Definition of 1 1 1 Contract Performance During Arbitration 4 3 4, 4 5.3 Contract Sum 3.8' 4.3-6, 4.3 7 4 4 4, 5.2.3 6.1.3 7.2 7 3 9.1 9.7 11 3 1 12.2 4 12.3 14.2 4 Contract Sum, Definition of 9.1 Contract Time 4.3 6, 4.3.8, 4 4 4, 7.2 1.3 7.3 8.21 8.31 97 1211 8.1 1 Contract Time, Definition of AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. CONTRACTOR 3 Contractor Definition of 3.1 6 1.2 Contractor's Bid 1 1 1 Contractor's Construction Schedules 3.10, 6.1 3 Contractor's Employees 3.3.2, 3 4.2, 3.8 1 3 9 3 18, 4.2 3 4.2 6, 8.1.2 10.2 10.3 11 1 1 14.2 1 0 Contractor's Liability Insurance 11 1 Contractor's Relationship with Separate Contractors and Owner's Forces 2.2.6, 3 12 5 3 14.2, 4.2 4, 6, 12.2 5 Contractor's Relationship with Subcontractors 1.2 4, 3.3.2, 318.1 318.2 5.2 53 54,96.2 11.37 11.3.8, 14.2 1.2 Contractor's Relationship with the Architect 1 1.2 3.2 1 3.2.2 33.3 351 373 311 312.8316,318,4.23 4•.24,4.2.6 4.2 12 .5.2 6.2.2 7.3 4, 9.8.2 11.3 7 12 1 13 5 Contractor's Representations 1.2.2 3 5 1 3 12 7 6.2.2 8.2 1 9.3.3 Contractor's Responsibility for Those Performing the Work 3.3.2 3 18, 4.2.3 10 Contractor's Review of Contract Documents 1.2.2 3.2 3 7.3 Contractor's Right to Stop the Work 9 7 Contractor s Right to Terminate the Contract 14.1 Contractor's Submittals 3 10 3 11 3 12 4.2 7 5.2 1 5.2.3 7.3.6, 9.2 9.3 1 9.8.2 9 9 1 9 10.2, 9 10.3 10 1.2 11 4.2, 114.3 Contractor's Superintendent 3 9 10.2 6 Contractor's Supervision and Construction Procedures 1.2 4, 3.3 3 4 4.2 3 8.2.2 8.2.3 10. Contractual Liability Insurance 11 1 1 7 11.2 1 Coordination and Correlation 1,2.2 1.2 4, 3.3 1 310 3 12 7 6.1.3 6.21 Copies Furnished of Drawings and Specifications 1.3 2.2 5 3 1.1 Correction of Work 2 3 2 4, 4.2 1 9.8.2 9 9 1 12 1.2, 12.2 13 7 1.3 Cost, Definition of 7.3.6, 14.3 5 Costs 24,3.21 374,3.8.2 315.2 4.36,4.37 4.3.8.1 5.2.3 6.1 1 6.2.3 6.3 7.3.3 3 7.3 6, 7 3 7 9 7 9.8.2 9 10.2 11.3 1.2, 11.3 1.3 11.34,11 39 121 12.21 12.24,12.25 135 14 Cutting and Patching 3.14 6.2.6 Damage to Construction of Owner or Separate Contractors 3 14.2, 6.2.4, 951 5 10.2 1.2, 10.25 103 11 1 11.3 12.2.5 Damage to the Work 3 14.2 9 9 1 10.2 1.2, 10.2. 5 10.3 11.3 Damages, Claims for 3 18, 4 3 9 6 1 1 6.2 5 8.3.2 9 5 1.2, 10 1 4 Damages for Delay 6.1 1 8 3 3 9 5 .1.6, 9 7 Date of Commencement of the Work, Definition of 8.1.2 Date of Substantial Completion, Definition of 8.1 3 Day Definition of 8 1 4 Decisions of the Architect 4.2.6, 4.2 7 4.2 11 4.2 1.2 4.2 13 4.3.2, 4.3 6, 4 4 1 4 4.4 4 5 6 3 7 3.6, 7 3.8, 8.1 3 8.3 1 9.2, 94, 951 9.8.2 991 101.2 135.2 14.2.2 14.24 Decisions to Withhold Certification 9.5, 9 7 14 1 1 3 Defective or Nonconforming Work, Acceptance, Rejection and Correction of 2.3 2 4 3 5 1 4.2 1 4.2 6, 4.3 5 9 5.2 9.8.2 .9 9 1 10.2 5 12 13 7 1 3 Defective Work, Definition of 3 5 1 Definitions 1 1 2 1 1 3 1 3 5 1 3 12 1 3 12.2 3 12 3 4 1 1 4.3 1 5 1 6.1.2 7.2 1 7.3 1 7 3 6, 8 1 9 1 9:8 1 Delays and Extensions of Time 4.3 1 4.3.8 1 4.3.8.2 6.1 1 6.2 3 7.2 1 7 3 1 7 3 4, 7 3'5 7.3.8, 7.39 81 1 8.3, 1031 14:1 14 Disputes 4 1 4, 4.3 4 4, 4 5 6.2 5 6 3 7.3.8, 9 3 1.2 Documents and Samples at the Site 3 11 Drawings, Definition of 1 1 5 Drawings and Specifications, Use and Ownership of 1 i 1 _1 3 2.2 5 3 11 5.3 Duty to Review Contract Documents and Field Conditions 3.2 Effective Date of Insurance 8.2.2 11 1.2 Emergencies 4 3 7 10.3 Employees, Contractor's 3.3.2, 3 4.2, 3.8 1 3 9 3 18.1 318.2 4.2.3 4.26,81.2 10.2, 10.3 1111 14.211 Equipment, Labor Materials and 1 1.3 1 1 6, 3 4 3 5 1 3.8.2,3 3 12 7 3 12 11 313 3 15 1 4.27 6.2 1 7.3.6, 9.3.2 9.3 3 11.3 12.2 4, 14 Execution and Progress of the Work 1 1.3 1.2.3 3.2 3 4.1 3 5 1 4.2.2, 4.2 3 4.3 4, 4.3.8, 6.2.2 7 1 3 739 8.2,83 95 991 10.2 14.2, 14.3 Execution, Correlation and Intent of the Contract Documents 1.2, 3 7 1 Extensions of Time 4.3 1 4,3.8, 7.2 1.3 8.3 10.3 1 Failure of Payment by Contractor 9 5 1 3 14.2 1.2 Failure of Payment by Owner 4 3 7 9 7 14.1.3 Faulty Work (See Defective or Nonconforming Work) Final Completion and Final Payment 4.2 1 4.2 9 4 3.2 4.35 9.10, 11 1.2 11 1.3 11 35 1231 137 Financial Arrangements, Owner's 2.2 1 Fire and Extended Coverage Insurance 11.3 GENERAL PROVISIONS 1 Governing Law 13.1 Guarantees (See Warranty and Warranties) Hazardous Materials 10 1 .10.2 4 Identification of Contract Documents 1.2 1 Identification of Subcontractors and Suppliers 5.2 1 Indemnification 3 17 3.18, 9 10.2, 10 1 4 11,3 1.2, 11 3 7 Information and Services Required of the Owner 2 1.2 2.2, 4.3 4, 6.1 3 6 1 4 6.2 6, 9.3.2j 9.6 1 9.6.4 9.8.3 9 9.2 9 10 3 1014, 11.2, 11.3 1351 135.2 Injury or Damage to Person or Property 4.3.9 Inspections 3.3 3 3.3 4, 3 7 1 4.2.2, 4.2 6, 4.2 9 4.3 6, 9 4.2 9.8.2 9 9.2 9 10 1 13 5 Instructions to Bidders 1 1 1 Instructions to the Contractor 3.8.1 4.2.8, 5.2 1 7 12 1 13 5.2 Insurance 4.3 9 6 1 1 7.3.6 4,9 3.2, 9.8.2 9 9 1 9 10.2 11 Insurance, Boiler and Machinery 11.3.2 Insurance, Contractor's Liability 11 1 Insurance, Effective Date of 8.2.2 11 1.2 Insurance, Loss of Use 11.3 3 Insurance, Owner's Liability 11.2 Insurance, Property 10.2 5 11.3 Insurance, Stored Materials 9.3.2 11 3 1 4 INSURANCE AND BONDS 11 Insurance Companies, Consent to Partial Occupancy 9 9 1 11.3 11 Insurance Companies, Settlement with 11.3 10 Intent of the Contract Documents 1.2.3 3 12 4, 4.2 6, 4.2 7 4.2 12 4.2 13 7 4 Interest 13.6 Interpretation 1.2 5 1 4 1.5, 4 1 1 4 3 1 5 1 6.1.2 8 1 4 Interpretations, Written 4.2 11 4.2 12 4.3 7 Joinder and Consolidation of Claims Required 4 5 6 Judgment on Final Award 4.5 1 4 5 4 1 4.5.7 Labor and Materials, Equipment 1 1 3 1 1 6, 3.4, 3 5 1 3.8.2 312.2 3 12 3 3 12 7 3 12 11 313 3 15 1 4.2 7 6.2 1 7 3 6, 9 3.2 9 3.3 12.2 4, 14 Labor Disputes 8.3 1 Laws and Regulations 1.3 3.6, 3 7 3 13 4 1 1 4 5 5 4 5 7 99 1 10.2.2 11 1 11.3 13 1 134 1.351 13 5.2, 136 Liens 2 1.2 4 3.2 4.3 5 1 8.2.2, 9 3.3 9 10.2 Limitation on Consolidation or Joinder 4.5.5 Limitations, Statutes of 4 5 4.2, 12.2 6, 13 7 Limitations of Authority 3 3 1 4 1.2 4.2 1 4.2.3 4.27 4.210 5.2.2, 5.2 4, 7 4, 11 3 10 AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION MA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 3 Limitations of Liability 2.3 3.2 1 3 5 1 3 7.3 3 12.8, 3 .12 11 317 3 18, 4.2.6, 4.2 7 4.212,6.2.2 94.2 9.6.4 9 10 4, 1014 10.25 11 1.2 11.21 11.37 134.2 135.2 Limitations of Time, General 2.2 1 2.2 4, 3.2 1 3 7.3 3.8.2 310 3 12 5 3 15 1 4.21 4.27 4.2.11 4.3.2 4.3.3 4.3 4,4.3.6, 4.3 9 4 5 4.2, 5.2 1 5.2.3 6.2 4, 7.3 4 7 4, 8.2, 9 5 9 6.2 9.8 9 9 9 10 11 1.3 11.3 1 11.3.2 11 3 5 11.3 6, 12.2 1 12.2.2 13 5 13 7 Limitations of Time, Specific 2 1.2 2.2 1 2 4, 3 10 3 11 3 15 1 4.2 1 4.2 41 4.3 4 4, 4 5 5.3 5 4 7.3 5 7.3 9 8.2 9.2 9.3 1 9.3 3 9 4 1 9 6.1 9 7 9.8.2, 9 10.2, 11 1.3 11.3.6, 11.310 11.311 12.2.2, 12.24, 12.26, 137 14 Loss of Use Insurance 11.3.3 Material Suppliers 1.3 1 3 12.1 4.2.4, 4.2 6, 5.2 1 9.3 1 9.3 1.2 9.3.3 9 4.2, 9 6.5 9 10 4 Materials, Hazardous 10 1 10.2 4 Materials, Labor Equipment and 1 1 3 1 1 6 3 4 3 5 1 3.8.2 312.2 3 12 3 3 12 7 3 12 11 313 3 15 1 4.27 6.21 7.3 6, 93.2 9.3.3 12.2 4, 14 Means, Methods, Techniques, Sequences and Procedures of Construction 3.3 1 4.2.3 4.2.7 9 4.2 Minor Changes in the Work 1 1 1 4.2.8, 4.3 7 7 1 7.4 MISCELLANEOUS PROVISIONS 1 3 Modifications, Definition of 1 1 1 Modifications to the Contract 1 1 1 1 1.2, 3 7 3 3 11 4 1.2 4.2 1 5.2 3 7 8.3'1 9 7 Mutual Responsibility 6.2 Nonconforming Work, Acceptance of 12.3 Nonconforming Work, Rejection and Correction of 2 3 1 4.35 95.2,9.8.2 12, 137'1.3 Notice 2.3 2 4 3.2 1 3.2.2 3 7.3 3 7 4 3 9 3 12.8, 3 12 9 3 17 4.3 4.4 4 4.5 5.2 1 5.3 5 4.1 1 8.2.2 9 4.1 95 1 96.1 97 910 101.2 10.2.6, 11 1.3 11.3 12.2.2 12.24, 13.3 1351 135.2 14 Notice, Written 2.3 2 4 3 9 3 12.8, 3 12 9 4.3 444 45 5.21 5.3 5411 8.2.2 941 951 97 910 101.2 10.26, 11 1 3 11.3 12.2.2 12.2 4, 13.3, 13 5.2 14 Notice of Testing and Inspections 13 5 1 13 5.2 Notice to Proceed 8.2.2 Notices, Permits, Fees and 2.2 3 3.7 3 13 7.3 6.4, 10.2.2 Observations, Architect s On -Site 4.2.2 4.2 5 4.36,94.2 951 9 10 1 135 Observations, Contractor s 1.2.2 3.2.2 Occupancy 9.6.6, 9.8.1 9 9 11.3 11 On -Site Inspections by the Architect 4.2.2 4.2 9 4.3 6, 9 4.2 9.8.2 9 9.2, 9 10 1 On -Site Observations by the Architect 4.2.2 4.2 5 4.3 6, 94.2 951 9 10 1 135 Orders, Written 2 3 3 9 4.3 7 7 8.2.2 11.3 9 12 1 12.2 13 5.2 14.3 1 2 OWNER Owner Definition of Owner Information and Services Required of the 2.1.2, 2.2, 4.34,6,9 1014, 11.2, 11.3 1351 14115 1413 Owner's Authority 3.8 1 4 1.3 4.2 9 5.2 1 5.2 4, 5 4 1 731 8.2.2 9.31 93.2 1141 12.24, 135.2 1,4.2, 14.31 Owner s Financial Capability 2.2 1 14 1 1 5 11.2 11.3.3 1 1.2, 5.2 1 5 4 1 9.6 4 2 4, 12.2 4 14.2.2.2 Owner's Liability Insurance Owner's Loss of Use Insurance Owner's Relationship with Subcontractors Owner's Right to Carry Out the Work Owner's Right to Clean Up 4 A201-1987 2.1 Owner's Right to Perform Construction and to Award Separate Contracts 6.1 Owner's Right to Stop the Work 2.3, 4.3 7 Owner's Right to Suspend the Work 14.3 Owner's Right to Terminate the Contract 14.2 Ownership and Use of Architect's Drawings, Specifications and Other Documents 1 1 1 1.3, 2.2 5 5.3 Partial Occupancy or Use 9.6.6, 9.9, 11 3 11 Patching, Cutting and 3.14, 6.2 6 Patents, Royalties and 3.17 Payment, Applications for 4.2 5 9.2 9.3, 9 4 951 9.8.3 9 10 1 9 10 3 9 10 4, 14.24 Payment, Certificates for 4.2 5 4.2 9 9.3.3 9.4, 9 5 9.6.1 9.6.6, 971 9.8.3 9 10 1 910.3 137 141 1.3 14.24 Payment, Failure of 4.3 7 9 5 1 3 9.7 9 10.2 14 1 1.3 14.2 1.2 Payment, Final 4.2 1 4.2 9 4.3.2 4.3 5 9 10 11 1.2 11 1.3 11.3 5 12.3 1 Payment Bond, Performance Bond and 7.3.6.4 910.3 11.39 114 Payments, Progress 4.3 4, 9.3 9 6 9.8.3 9 10 3 136, 14.2.3 PAYMENTS AND COMPLETION 9, 14 Payments to Subcontractors 5 4.2 9 5 1 3 9 6.2 9 6.3 9 6.4, 11.3.8, 14.2 1.2 PCB 10 1 Performance Bond and Payment Bond 7.3 6.4 910.3 11.39 114 Permits, Fees and Notices 2.2.3 3.7 3 13 7.3.6.4 10.2.2 PERSONS AND PROPERTY PROTECTION OF 10 Polychlorinated Biphenyl 10 1 Progress and Completion Product Data, Definition of 3 12.2 Product Data and Samples, Shop Drawings Project Representatives 3 11 3.12, 4 .2 7 4.2.2 4.3 4, 8.2 Progress Payments 4.3 4, 9.3 9.6, 9.8.3 9 10.3 13 6, 14.2 3 Project, Definition of the 1 1 4 Project Manual, Definition of the 1 1 7 Project Manuals 2.2 5 4 .2 1 9 10 Property Insurance 10.2 5 11.3 PROTECTION OF PERSONS AND PROPERTY 10 Regulations and Laws 13 3 6, 3 7 •3 13 4 1 1 4.5 5 457 10.2.2 11 1 11.3 131 134 1351 135.2 136, 14 Rejection of Work 3 5 1 4.2 6, 12.2 Releases of Waivers and Liens 9 10.2 Representations 1.2.2 3 5 1 3 12 7 6.2.2 8.2 1 9.3.3 9 4.2 9 5 1 9.8.2 9 10 1 Representatives 2 1 1 3 1 1 3 9 411 4.21 4.210 511 51.2 13.21 Resolution of Claims and Disputes 4.4, 4 5 Responsibility for Those Performing the Work 3 3.2 4.2 3 6 1.3 6.2 10 Retainage 9 3 1 9 6.2 9.8 3 9 9 1 9 10.2 9 10.3 Review of Contract Documents and Field Conditions by Contractor 1.2.2, 3.2', 3 7 3 3 12 7 Review of Contractor's Submittals by Owner and Architect 3 10 1 3 10.2 3 11 3 12 4.2 7 4.2 9 5.2 1 5.2 3 9.2 9.8.2 Review of Shop Drawings, Product Data and Samples by Contractor 3 12 5 Rights and Remedies 1 1.2 2.3 2 4 3 5 1 3 15.2 4.2 6, 4.3 6, 4 5 5.3 6.1 6 3 7 3 1 8.3 1 9 5 1 9 7 10.2 5 10.3 12.2.2 12.2 4 13.4, 14 3.17 6.3 Royalties and Patents AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. Rules and Notices for Arbitration 4.5.2 Safety of Persons and Property 10.2 Safety Precautions and Programs 4.2.3 4.2 7 10.1 Samples, Definition of 3 12.3 Samples, Shop Drawings, Product Data and 3 11 3.12, 4.2 7 Samples at the Site, Documents and 3.11 Schedule of Values 9.2, 9.3 1 Schedules, Construction 3 10 Separate Contracts and Contractors 1 1 4 3 14.2 4.2 4, 455 6, 11.37 12 1.2 12.25 Shop Drawings, Definition of 3 12.1 Shop Drawings, Product Data and Samples 3 11 3.12, 4.2 7 Site, Use of 3.13, 6.1 1 6.2 1 Site Inspections 1.2.2, 3.3 4, 4.2.2, 4.2 9 4.3 6, 9.8.2 9 10 1 13 5 Site Visits, Architect's 4.2.2, 4.2 5 4.2 9 4.3 6, 9 4.2, 9 5 1 9.8.2 9 9.2 9 10 1 13 5 Special Inspections and Testing 4.2 6, 12.2 1 13 5 Specifications, Definition of the 1 1.6 Specifications, The 1 1 1 1 1.6, 1 1 7 1.2 4, 1 3 3 11 Statutes of Limitations 4 5 4.2, 12.2 6, 13 7 Stopping the Work 2.3 4.3 7 9 7 10 1.2 10.3 14 1 Stored Materials 6.2 1 9.3.2, 10.2 1.2 11 3 1 4 12.2 4 Subcontractor Definition of 5 1 1 SUBCONTRACTORS 5 Subcontractors, Work by 1.2 4, 3 3.2, 3 12 1 4.2.3 5 3 5 4 Subcontractual Relations 5.3, 5 4, 9.3 1.2 9.6.2, 96.3 964, 10.2 1 11 37 11.3.8, 141 1 14.2 1.2 14.3.2 Submittals 1 3 3.2.3 3 10 3 11 3 12 4.2 7 5.2 1 5.2.3 7.3 6, 9.2 9.3 1 9.8.2 9 9 1 9 10.2 9 10.3 10 1.2 11 1 3 Subrogation, Waivers of 6.1 1 11 3 5 11.3.7 Substantial Completion 4.2 9 4.3 5.2, 8.1 1 8 1.3 8.2.3 9.8, 991 12.2 1 12.2.2, 137 Substantial Completion, Definition of 9.8.1 Substitution of Subcontractors 5.2 3 5.2 4 Substitution of the Architect 4 1.3 Substitutions of Materials 3 5 1 Sub subcontractor Definition of 5 1.2 Subsurface Conditions 4 3 6 Successors and Assigns 13.2 Superintendent 3.9, 10.2 6 Supervision and Construction Procedures 1.2 4 3.3, 3 4, 4.2 3 4 3 4, 6 1.3 6.2 4 7 1.3 7 3 4, 8.2 8 3 1 10 12, 14 Surety 44.1 444,541.2 910.2 9 10 3 14.2.2 Surety Consent of 9 9 1 9 10.2 9 10 3 Surveys 2.2.2, 3 18.3 Suspension by the Owner for Convenience 14.3 Suspension of the Work 4 3 7 5 4.2, 14.1 1 4, 14.3 Suspension or Termination of the Contract 4 3 7 5 4 1 1 14 Taxes 3.6, 7.3 6.4 Termination by the Contractor 14.1 Termination by the Owner for Cause 5 4.1 1 14.2 Termination of the Architect 4 1 3 Termination of the Contractor 14.2:2 TERMINATION OR SUSPENSION OF THE CONTRACT 14 Tests and Inspections 3.3.3 4.2 6, 4.2 9 9 4.2, 12.2 1 13.5 TIME 8 Time, Delays and Extensions of 4.3.8, 7.2 1 8.3 Time Limits, Specific 2 1.2, 2.2 1 2 4, 3 10 3 11 3 15 1 4.2 1 4.2 11 4.3 4 4, 4.5 5.3 5 4, 7.3 5 7 3 9 8.2 9.2, 9 3 1 93.3 941 96-1 97 9.8.2, 910.2 11 1.3 11.3.6, 11 310 11311 12.2.2 12.24, 12.2.6, 137 14 Time Limits on Claims 4.3.2 4.3.3, 4.3.6, 4.3 9 4 4, 4 5 Title to Work 9.3.2 9 3.3 UNCOVERING AND CORRECTION OF WORK 12 Uncovering of Work 12.1 Unforeseen Conditions 4.3 6, 8.3 1 10 1 Unit Prices 7 1 4, 7 3.3.2 Use of Documents 1 1 1 1.3 2.2 5 3 12 7 5.3 Use of Site 3.13, 6.1 1 6.2 1 Values, Schedule of 9.2, 9.3 1 Waiver of Claims: Final Payment 4.3.5, 4 5 1 9 10.3 Waiver of Claims by the Architect 13 4.2 Waiver of Claims by the Contractor 9 10 4, 11.3 7 13 4.2 Waiver of Claims by the Owner 4.3 5 4 5 1 9 9.3 9 10 3 11.3.3 11.35 11.3 134.2 Waiver of Liens 9 10.2 Waivers of Subrogation 6.1 1 11.3 5 11.3 7 Warranty and Warranties 3.5, 4.2 9 435.3 93.3 9.8.2,991 12.2.2, 1371 3 Weather Delays 4 3.8.2 When Arbitration May Be Demanded 4.5.4 Work, Definition of 1 1 3 Written Consent 1.3 1 3 12.8, 3 14.2 4 1.2, 4.3 4, 455 93.2 9.8.2 991 910.2 9 10 3 101.2 101.3 11.31 11.314,11 13.2 134.2 Written Interpretations 4.2 11 4.2 12, 4 3 7 Written Notice 2 3 2 4, 3 9 3 12.8, 3 12 9 4.3 4 4 4, 4.5 5.21 53 5411 8.2.2,941 951 97 910 101.2 10.26, 11 13 11.3 12.2.2, 12.24 13.3, 135.2, 14 Written Orders 2 3 3 9 4 3 7 7 8.2.2, 11.39 12 1 12.2 13 5.2 143 1 ALA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution. A201 1987 5 6 A201 1987 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION ARTICLE 1 GENERAL PROVISIONS 1 1 BASIC DEFINITIONS 1 1 1 THE CONTRACT DOCUMENTS The Contract Documents consist of the Agreement between Owner and Contractor (hereinafter the Agreement), Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modifi- cation is (1) a written amendment to the Contract signed by both parties, (2) a Change Order (3) a Construction Change Directive or (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in 'the Agreement, the Contract Documents do not include other documents such as bidding requirements (advertisement or invitation to bid, Instructions to Bidders, sample forms; the Contractor's bid or portions of addenda relating to bidding requirements). 1 1.2 THE CONTRACT The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated` agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. The Con- tract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contrac tual relationship of any kind (1) between the Architect and Con- tractor (2) between the Owner and a Subcontractor or Sub subcontractor or (3) between any persons or entities other than the Owner and Contractor The Architect shall, however be entitled to performance and enforcement of obligations under the Contract intended to facilitate performance of the Architect s duties. 1 1.3 THE WORK The term `Work means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor's obligations. The Work may constitute the whole or a part of the Project. 1 1.4 THE PROJECT The Project is the total construction of which the Work per formed under the Contract Documents may be the whole or a part and which may include construction by the Owner or by separate contractors. 1 1.5 THE DRAWINGS The Drawings are the graphic and pictorial portions of the Con- tract Documents, wherever located and whenever issued, showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, sched- ules and diagrams. 1 1.6 THE SPECIFICATIONS The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equip- ment, construction systems, standards and workmanship for the Work, and performance of related services. 1 1 7 THE PROJECT MANUAL The Project Manual is the volume usually assembled for the Work which may include the bidding requirements, sample forms, Conditions of the Contract and Specifications. 1.2 EXECUTION, CORRELATION AND INTENT 1.2.1 The Contract Documents shall be signed by the Owner and Contractor as provided in the Agreement. If either the Owner or Contractor or both do not sign all the Contract Documents; the Architect shall identify such unsigned Docu- ments upon request. 1.2.2 Execution of the Contract by the Contractor is a repre sentation that the Contractor has visited the site, become famil- iar with local conditions under which the Work is to be per formed and correlated personal observations with require ments of the Contract Documents. 1.2.3 The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor The Contract Documents are comple mentary and what is required by one shall be as binding as if required by all, performance by the Contractor shall be required only to the extent consistent with the Contract Docu- ments and reasonably inferable from them as being necessary to produce the intended results. 1.2.4 Organization of the Specifications into divisions, sections and articles, and arrangement of Drawings shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. 1.2.5 Unless otherwise stated in the Contract Documents, words which have well -known technical or construction indus- try meanings are used in the Contract Documents in accord- ance with such recognized meanings. 1.3 OWNERSHIP AND USE OF ARCHITECT'S DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS 1.3.1 The Drawings, Specifications and other documents prepared by the Architect are instruments of the Architect s service through which the Work to be executed by the Con- tractor is described. The Contractor may retain one contract record set. Neither the Contractor nor any Subcontractor Sub subcontractor or material or equipment supplier shall own or claim a copyright in the Drawings, Specifications and other documents prepared by the Architect, and unless otherwise indicated the Architect shall be deemed the author of them and will retain all common law statutory and other reserved rights, in addition to the copyright. All copies of them, except the Contractor s record set, shall be returned or suitably accounted for to the Architect, on request, upon completion of the Work. The Drawings, Specifications and other documents prepared by the Architect, and copies thereof furnished to the Contrac tor are for use solely with respect to this Project. They are not to be used by the Contractor or any Subcontractor Sub subcontractor or material or equipment supplier on other proj- ects or for additions to this Project outside the scope of the AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying,violates U.S. copyright laws and is subject to legal prosecution. Work without the specific written consent of the Owner and Architect. The Contractor Subcontractors, Sub subcontractors and material or equipment suppliers are granted a limited license to use and reproduce applicable portions of the Draw- ings, Specifications and other documents prepared by the Architect appropriate to and for use in the execution of their Work under the Contract Documents. All copies made under this license shall bear the statutory copyright notice, if any shown on the Drawings, Specifications and other documents prepared by the Architect. Submittal or distribution to meet official regulatory requirements or for other purposes in con- nection with this Project is not to be construed as publication in derogation of the Architect's copyright or other reserved rights. 1.4 CAPITALIZATION 1.4.1 Terms capitalized in these General Conditions include those which are (1) specifically defined, (2) the titles of num- bered articles and identified references to Paragraphs, Subpara- graphs and Clauses in the document or (3) the titles of other documents published by the American Institute of Architects. 1.5 INTERPRETATION 1.5.1 In the interest of brevity the Contract Documents fre quently omit modifying words such as all and any' and arti= cles such as the and an, but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement. ARTICLE 2 OWNER 2.1 DEFINITION 2.1 1 The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number The term Owner' means the Owner or the Owner's authorized representative. 2.1.2 The Owner upon reasonable written request shall furnish to the Contractor in writing information which is necessary and relevant for the Contractor to evaluate, give notice of or enforce mechanic s lien rights. Such information shall include a correct statement of the record legal title to the property on which the Project is located, usually referred to as the.site, and the Owner's interest therein at the time of execution of the Agreement and, within five days after any change, information of such change in title, recorded or unrecorded. 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER 2.2.1 The Owner shall, at the request of the Contractor prior to execution of the Agreement and promptly from time to time thereafter furnish to the Contractor reasonable evidence that financial arrangements have been made to fulfill the Owner's obligations under the Contract. [Note: Unless such reasonable evidence were furnished on request prior to the execution of the Agreement, the prospective contractor would not be required to execute the Agreement or to commence the Work.] 2.2.2 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a legal description of the site. 2.2.3 Except for permits and fees which are the responsibility of the Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals, easements, assess- ments and charges required for construction, use or occupancy of permanent structures or'for permanent changes in existing facilities. 2.2.4 Information or services under the Owner's control shall be furnished by the Owner with reasonable promptness to avoid delay, in orderly progress of the Work. 2.2.5 Unless otherwise provided in the Contract Documents, the Contractor will be furnished; free of charge, such copies of Drawings and Project Manuals as are reasonably necessary for execution of the Work. 2:2.6 The foregoing are in addition to other duties and respon- sibilities of the Owner enumerated herein and especially those in respect to Article 6 (Construction by Owner or by Separate Contractors), Article 9 (Payments and Completion) and Article 11 (Insurance and Bonds). 2.3 OWNER'S RIGHT TO STOP THE WORK 2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the Contract Documents as required by Paragraph '12.2 or persistently fails to carry out Work in accordance with the Contract Documents, the Owner by written order signed personally or by an agent specifically so empowered by the Owner in writing, may order the Contrac tor to stop the Work, or any portion thereof, until the cause for such order has been eliminated, however the right of the Owner to stop the Work shall not give rise to a duty on the part of the. Owner to exercise this right for the benefit of the Con- tractor or any other person or entity except to the extent required by Subparagraph 6.1 3 2.4 OWNER'S RIGHT TO CARRY OUT THE WORK 2.4 1 If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a seven -day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may after such seven -day period give the Contractor a second written notice to correct such deficiencies within a second seven -day period. If the Contractor within such second seven day period after receipt of such second notice fails to com- mence and continue to correct any deficiencies, the Owner may without prejudice to other remedies the Owner may have, correct such deficiencies. In such case an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the cost of correcting such defi- ciencies, including compensation for the Architect s additional services and expenses made necessary by such default, neglect or failure. Such action by the Owner and amounts charged to the Contractor are both subject to prior approval of the Archi- tect. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner 3.1 DEFINITION ARTICLE 3 CONTRACTOR 3.1 1 The Contractor is the person or entity identified as such in the Agreement and-is referred to throughout the Contract Documents as if singular in number The term Contractor' means the Contractor or the Contractor s authorized representative. AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 7 3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR 3.2.1 The Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by the Owner pursuant to Subparagraph 2.2.2 and shall at once report to the Architect errors, inconsistencies or omissions discovered. The Contractor shall not be liable to the Owner or Architect for damage resulting from errors, inconsis- tencies or omissions in the Contract Documents unless the Contractor recognized such error inconsistency or omission and knowingly failed to report it to the Architect. If the Con- tractor performs any construction activity knowing it involves a recognized error inconsistency or omission in the Contract Documents without such notice to the Architect, the Contrac tor shall assume appropriate responsibility for such perfor mance and shall bear an appropriate amount of the attributable costs for correction. 3.2.2 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field mea- surements and conditions and other information known to the Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to the Architect at once. 3.2.3 The Contractor shall perform the Work in accordance with the Contract Documents and submittals approved pur suant to Paragraph 3 12 3.3 SUPERVISION AND CONSTRUCTION PROCEDURES 3.3.1 The Contractor shall supervise and direct the Work, using the Contractor's best skill and attention. The Contractor shall be solely responsible for and have control over construe tion means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Con- tract, unless Contract Documents give other specific instruc tions concerning these matters. 3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with the Contractor 3.3.3 The Contractor shall not be relieved of obligations to per form the Work in accordance with the Contract Documents either by activities or duties of the Architect in the Architect s administration of the Contract, or by tests, inspections or approvals required or performed by persons other than the Contractor 3.3.4 The Contractor shall be responsible for inspection of por tions of Work already performed under this Contract to deter mine that such portions are in proper condition to receive sub- sequent Work. 3.4 LABOR AND MATERIALS 3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor materials, equip- ment, tools, construction equipment and machinery water heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorpo- rated or to be incorporated in the Work. 3.4.2 The Contractor shall enforce strict discipline and good order among the Contractor's employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. 8 A201 1987 3.5 WARRANTY 3:5.1 The Contractor warrants to the Owner and Architect that materials and equipment furnished under the Contract will be of good quality and new unless otherwise required or permit ted by the Contract Documents, that the Work will be free from defects not inherent in the quality required or permitted, and that the Work will conform with the requirements of the Contract Documents. Work not conforming to these require mens, including substitutions not properly approved and authorized, may be considered defective. The Contractor's warranty excludes remedy for damage or defect caused by abuse, modifications not executed by the Contractor improper or insufficient maintenance, improper operation, or normal wear and tear under normal usage. If required by the Architect, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. 3.6 TAXES 3.6.1 The Contractor shall pay sales, consumer use and similar taxes for the Work or portions thereof provided by the Con- tractor which are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. 3.7 .PERMITS, FEES AND NOTICES 3.7 1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay for the building permit and other permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required when bids are received or nego- tiations concluded. 3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations and lawful orders of public authorities bearing on performance of the Work. 3.7.3 It is not the Contractor's responsibility to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regula- tions. However if the Contractor observes that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify the Architect and Owner in writing, and necessary .changes shall be accomplished by appropriate Modification. 3.7.4 If the Contractor performs Work knowing it to be con- trary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the Architect and Owner the Contractor shall assume full responsibility for such Work and shall bear the attributable costs. 3.8 ALLOWANCES 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but the Contractor shall not be required to employ persons or entities against which the Contractor makes reasonable objection. 3.8.2 Unless otherwise provided in the Contract Documents. 1 materials and equipment under an allowance shall be selected promptly by the Owner to avoid delay in the Work, .2 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts, AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright Taws and is subject to legal prosecution. .3 Contractor's costs for unloading and handling at the site, labor installation costs, overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum and not in the allowances, .4 whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order The amount of the Change Order shall reflect (1) the difference between actual costs and the allowances under Clause 3.8.2.2 and (2) changes in Contractor's costs under Clause 3 8.2 3 3.9 SUPERINTENDENT 3.9.1 The Contractor shall employ a competent superinten- dent and necessary assistants who shall be in attendance at the Project site during performance of the Work. The superinten- dent shall represent the Contractor and communications given to the superintendent shall be as binding as if given to the Con- tractor Important communications shall be confirmed in writ ing. Other communications shall be similarly confirmed on written request in each case. 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES 3.10.1 The Contractor promptly after being awarded the Con- tract, shall prepare and submit for the Owner's and Architect s information a Contractor's construction schedule for the Work. The schedule shall not exceed time limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Con- tract Documents, and shall provide for expeditious and practi- cable execution of the Work. 3.10.2 The Contractor shall prepare and keep current, for the Architect s approval, a schedule of submittals which is coordi- nated with the Contractor's construction schedule and allows the Architect reasonable time to review submittals. 3.10.3 The Contractor shall conform to the most recent schedules. 3.11 DOCUMENTS AND SAMPLES AT THE SITE 3.11 1 The Contractor shall maintain at the site for the Owner one record copy of the Drawings, Specifications, addenda, Change Orders and other Modifications, in good order and marked currently to record changes and selections made during construction, and in addition approved Shop Drawings, Prod- uct Data, Samples and similar required submittals. These shall be available to the Architect and shall be delivered to the Archi- tect for submittal to the Owner upon completion of the Work. 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or a Subcontractor Sub subcontractor manufacturer supplier or distributor to illustrate some portion of the Work. 3.12.2 Product Data are illustrations, standard schedules, per formance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work. 3.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 3.12.4 Shop Drawings, Product Data, Samples and similar sub- mittals are not Contract Documents. The purpose of their sub- mittal is to demonstrate for those portions of the Work for which submittals are required the way the Contractor proposes to conform to the information given and the design concept expressed in the Contract Documents. Review by the Architect is subject to the limitations of Subparagraph 4.2 7 3.12.5 The Contractor shall review approve and submit to the Architect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents with reason- able promptness and in such sequence to cause no delay in the Work or in the activities of the Owner or of separate con- tractors. Submittals made by the Contractor which are not required by the Contract Documents may be returned without action. 3.12.6 The Contractor shall perform no portion of the Work requiring submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submit tal has been approved by the Architect. Such Work shall be in accordance with approved submittals. 3.12.7 By approving and submitting Shop Drawings, Product Data, Samples and similar submittals, the Contractor represents that the Contractor has determined and verified materials, field measurements and field construction criteria related thereto or will do so and has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 3.12.8 The Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect in writing of such deviation at the time of submittal and the Architect has given written approval to the specific deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Draw ings, Product Data, Samples or similar submittals by the Archi- tect s approval thereof. 3.12.9 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by the Architect on previous submittals. 3.12.10 Informational submittals upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents. 3.12.11 When professional certification of performance criteria of materials, systems or equipment is required by the Contract Documents, the Architect shall be entitled to rely upon the accuracy and completeness of such calculations and certifi- cations. 3.13 USE OF SITE 3.13.1 The Contractor shall confine operations at the site to areas permitted by law ordinances, permits and the Contract Documents and shall not unreasonably encumber the site with materials or equipment. 3.14 CUTTING AND PATCHING 3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly 3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or other wise altering such construction, or by excavation. The Contrac tor shall not cut or otherwise alter such construction by the AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 9 Owner or a separate contractor except with written consent of the Owner and of such separate contractor such consent shall not be unreasonably withheld. The Contractor shall not unrea- sonably withhold from the Owner or a separate contractor the Contractor's consent to cutting or otherwise altering the Work. 3.15 CLEANING UP 3.15.1 The Contractor shall keep the premises and surround- ing area. free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work the Contractor shall remove from and about the Project waste materials, rubbish, the Contractor's tools, construction equipment, machinery and surplus materials. 3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and the cost thereof shall be charged to the Contractor 3.16 ACCESS TO WORK 3.16.1 The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever located. 3.17 ROYALTIES AND PATENTS 3.17 1 The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or prod- uct of a particular manufacturer or manufacturers is required by the Contract Documents. However if the Contractor has rea- son to believe that the required design, process or product is an infringement of a patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the Architect. 3.18 INDEMNIFICATION 3.18.1 To the fullest extent permitted by law the Contractor shall indemnify and hold harmless the Owner Architect, Archi- tect s consultants, and agents and employees of any of them from and against claims, damages, losses and expenses, includ- ing but not limited to attorneys fees, arising out of or resulting from performance of the Work, provided that such claim, dam- age, loss or expense is attributable to bodily injury sickness, disease or death, or to injury to or destruction of tangible prop- erty (other than the Work itself) including loss of use resulting therefrom, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor a Subcontractor anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph 3 18. 3.18.2 In claims against any person or entity indemnified under this Paragraph 3 18 by an employee of the Contractor a Subcontractor anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnifica- tion obligation under this Paragraph 3 18 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor or a Subcontractor under workers or workmen s compensation acts, disability benefit acts or other employee benefit acts. 3.18.3 The obligations of the Contractor under this Paragraph 3 18 shall not extend to the liability of the Architect, the Archi- 10 A201 1987 tect's consultants, and agents and employees of any of them arising out of (1) the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, designs or specifica- tions, or (2) the giving of or the failure to give directions or instructions by the Architect, the Architect's consultants, and agents and employees of any of them provided such giving or failure to give is the primary cause of the injury or damage ARTICLE 4 ADMINISTRATION OF THE CONTRACT 4.1 ARCHITECT 4.1 1 The Architect is the person lawfully licensed to practice architecture or an entity lawfully practicing architecture iden- tified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number The term Architect means the Architect or the Architect s authorized representative. 4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner Contractor and Architect. Consent shall not be unrea- sonably withheld. 4.1.3 In case of termination of employment of the Architect, the Owner shall appoint an architect against whom the Con- tractor makes no reasonable objection and whose status under the Contract Documents shall be that of the former architect. 4.1.4 Disputes arising under Subparagraphs 4 1.2 and 4 1.3 shall be subject to arbitration. 4.2 ARCHITECT'S ADMINISTRATION OF THE CONTRACT 4.2.1 The Architect will provide administration of the Contract as described in the Contract Documents, and will be the Owner's representative (I) during construction, (2) until final payment is due and (3) with the Owner's concurrence, from time to time during the correction period described in Para- graph 12.2 The Architect will advise and consult with the Owner The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents, unless otherwise modified by written instrument in accordance with other provisions of the Contract. 4.2.2 The Architect will visit the site at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the completed Work and to determine in general if the Work is being performed in a manner. indicat ing that the Work, when completed, will be in accordance with the Contract Documents. However the Architect will not be required to make exhaustive or continuous on -site inspections to check quality or quantity of the Work. On the basis of on- site observations as an architect, the Architect will keep the Owner informed of progress of the Work, and will endeavor to guard the Owner against defects and deficiencies in the Work. 4.2.3 The Architect will not have control over or charge of and will not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, since these are solely the Contractor's responsibility as provided in Paragraph 3.3 The Architect will not be responsible for the Contractor's failure to carry out the Work in accordance with the Contract Documents. The Architect will not have control over or charge of and will not be responsible for acts or omissions of the Con- AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. tractor Subcontractors, or their agents or employees, or of any other persons performing portions of the Work. 4.2.4 Communications Facilitating Contract Administra- tion. Except as otherwise provided in the Contract Documents or when direct communications have been specially autho- rized, the Owner and Contractor shall endeavor to communi- cate through the Architect. Communications by and with the Architect's consultants shall be through the Architect. Commu- nications by and with Subcontractors and material suppliers shall be through the Contractor Communications by and with separate contractors shall be through the Owner 4.2.5 Based on the Architect s observations and evaluations of the Contractor s Applications for Payment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts. 4.2.6 The Architect will have authority to reject Work which does not conform to the Contract Documents. Whenever the Architect considers it necessary or advisable for implementa- tion of the intent of the Contract Documents, the Architect will have authority to require additional inspection or testing of the Work in accordance with Subparagraphs 13 5.2 and 13 5 3 whether or not such Work is fabricated, installed or completed. However neither this authority of the Architect nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Archi- tect to the Contractor Subcontractors, material and equipment suppliers, their agents or employees, or other persons perform- ing portions of the Work. 4.2.7 The Architect will review and approve or take other appropriate action upon the Contractor's submittals such as Shop Drawings, Product Data and Samples, but only for the limited purpose of checking for conformance with information given and the design concept expressed in the Contract Docu- ments The Architect s action will be taken with such reason- able promptness as to cause no delay in the Work or in the activities of the Owner Contractor or separate contractors, while allowing sufficient time in the Architect s professional judgment to permit adequate review Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities, or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of the Contractor as required by the Contract Documents. The Architect's review of the Contractor's submit tals shall not relieve the Contractor of the obligations under Paragraphs 3 3 3 5 and 3 12 The Architect s review shall not constitute approval of safety precautions or unless otherwise specifically stated by the Architect, of any construction means, methods, techniques, sequences or procedures. The Architect s approval of a specific item shall not indicate approval of an assembly of which the item is a component. 4.2.8 The Architect will prepare Change Orders and Construc tion Change Directives, and may authorize minor changes in the Work as provided in Paragraph 7 4 4.2.9 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date of final completion, will receive and forward to the Owner for the Owner's review and records written warranties and related documents required by the Contract and assembled by the Contractor and will issue a final Certificate for Payment upon compliance with the requirements of the Contract Documents. 4.2.10 If the Owner and Architect agree, the Architect will pro- vide one or more project representatives to assist in carrying out the Architect's responsibilities at the site. The duties, responsibilities and limitations of authority of such project representatives shall be as set forth in an exhibit to be incorpo- rated in the Contract Documents. 4.2.11 The Architect will interpret and decide matters concern- ing performance under and requirements of the Contract Documents on written request of either the Owner or Contrac tor The Architect s response to such requests will be made with reasonable promptness and within any time limits agreed upon. If no agreement is made concerning the time within which interpretations required of the Architect shall be fur nished in compliance with this Paragraph 4.2 then delay shall not be recognized on account of failure by the Architect to fur nish such interpretations until 15 days after written request is made for them. 4.2.12 Interpretations and decisions of the Architect will be consistent with the intent of and reasonably inferable from the Contract Documents and will be in writing or in the form of drawings. When making such interpretations and decisions the Architect will endeavor to secure faithful performance by both Owner and Contractor will not show partiality to either and will not be liable for results of interpretations or decisions so rendered in good faith. 4.2.13 The Architect s decisions on matters relating to aesthetic effect will be final if consistent with the intent expressed in the Contract Documents. 4.3 CLAIMS AND DISPUTES 4.3.1 Definition. A Claim is a demand or assertion by one of the parties seeking, as a matter of right, adjustment or interpre tation of Contract terms, payment of money extension of time or other relief with respect to the terms of the Contract. The term Claim also includes other disputes and matters in ques- tion between the Owner and Contractor arising out of or relat ing to the Contract. Claims must be made by written notice. The responsibility to substantiate Claims shall rest with the party making the Claim. 4.3.2 Decision of Architect. Claims, including those alleging an error or omission by the Architect, shall be referred initially to theArchitect for action as provided in Paragraph 4 4 A deci- sion by the Architect, as provided in Subparagraph 4 4 4, shall be required as a condition precedent to arbitration or litigation of a Claim between the Contractor and Owner as to all such matters arising prior to the date final payment is due, regardless of (1) whether such matters relate to execution and progress of the Work or (2) the extent to which the Work has been com- pleted. The decision by the Architect in response to a Claim shall not be a condition precedent to arbitration or litigation in the event (1) the position of Architect is vacant, (2) the Architect has not received evidence or has failed to render a decision within agreed time limits, (3) the Architect has failed to take action required under Subparagraph 4 4 4 within 30 days after the Claim is made, (4) 45 days have passed after the Claim has been referred to the Architect or (5) the Claim relates to a mechanic s lien. 4.3.3 Time Limits on Claims. Claims by either party must be made within 21 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later Claims must be made by written notice. An additional Claim made after the initial Claim has been implemented by Change Order will not be considered unless submitted in a timely manner AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 11 4.3.4 Continuing Contract Performance. Pending final reso- lution of a Claim including arbitration, unless otherwise agreed in writing the Contractor shall proceed diligently with perfor mance of the Contract and the Owner shall continue to make payments in accordance with the Contract Documents. 4.3.5 Waiver of Claims: Final Payment. The making of final payment shall constitute a waiver of Claims by the Owner except those arising from. 1 liens, Claims, security interests or encumbrances aris- ing out of the Contract and unsettled; .2 failure of the Work to comply with the requirements of the Contract Documents, or .3 terms of special warranties required by the Contract Documents. 4.3.6 Claims for Concealed or Unknown Conditions. If con- ditions are encountered at the site which are (1) subsurface or otherwise concealed Physical conditions which differ materi- ally from those indicated in the Contract Documents or (2) unknown physical conditions of an unusual nature, which dif- fer materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Contract Documents, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than 21 days after first observance of the conditions. The Archi- tect will promptly investigate such conditions and, if they differ materially and cause an increase or decrease in the Contractor's cost of, or time required for performance of any part of the Work, will recommend an equitable adjustment in the Contract Sum or Contract Time, or both. If the Architect determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the Architect shall so notify the Owner and Contractor in writing, stating the reasons. Claims by either party in opposition to such determination must be made within 21 days after the Architect has given notice of the decision. If the Owner and Contractor cannot agree on an adjustment in the Contract Sum or Contract Time, the adjustment shall be referred to the Architect for initial deter mination, subject to further proceedings pursuant to Paragraph 4.4. 4.3.7 Claims for Additional Cost. If the Contractor wishes to make Claim for an increase in the Contract Sum, written notice as provided herein shall be given before proceeding to execute the Work. Prior notice is not required for Claims relating to an emergency endangering life or property arising under Para- graph 10 3 If the Contractor believes additional cost is involved for reasons including but not limited to (1) a written interpretation from the Architect, (2) an order by the Owner to stop the Work where the Contractor was not at fault, (3) a writ ten order for a minor change in the Work issued by the Archi- tect, (4) failure of payment by the Owner (5) termination of the Contract by the Owner (6) Owner's suspension or (7) other reasonable grounds, Claim shall be filed in accordance with the procedure established herein. 4.3.8 Claims for Additional Time 4.3.8.1 If the Contractor wishes to make Claim for an increase in the Contract Time, written notice as provided herein shall be given. The Contractor s Claim shall include an estimate of cost and of probable effect of delay on progress of the Work. In the case of a continuing delay only one Claim is necessary 4.3.8.2 If adverse weather conditions are the basis for a Claim for additional time, such Claim shall be documented by data 12 A201 1987 substantiating that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the scheduled construction. 4.3.9 Injury or Damage to Person or Property If either party to the Contract suffers injury or damage to person or property because of an act or omission of the other party of any of the other party s employees or agents, or of others for whose acts such party is legally liable, written notice of such injury or damage, whether or not insured, shall be given to the other party within a reasonable time not exceeding 21 days after first observance. The notice shall provide sufficient detail to enable the other party to investigate the matter If a Claim for addi- tional cost or time related to this Claim is to be asserted, it shall be filed as provided in Subparagraphs 4.3 7 or 4.3.8 4.4 RESOLUTION OF CLAIMS AND DISPUTES 4.4.1 The Architect will review Claims and take one or more of the following preliminary actions within ten days of receipt of a Claim. (1) request additional supporting data from the claimant, (2) submit a schedule to the parties indicating when the Archi- tect expects to take action, (3) reject the Claim in whole or in part, stating reasons for rejection, (4) recommend approval of the Claim by the other party or (5) suggest a compromise. The Architect may also but is not obligated to notify the surety if any of the nature and amount of the Claim. 4.4.2 If a Claim has been resolved, the Architect will prepare or obtain appropriate documentation. 4 4.3 If a Claim has not been resolved, the party making the Claim shall, within ten days after the Architect s preliminary response, take one or more of the following actions. (1) submit additional supporting data requested by the Architect, (2) modify the initial Claim or (3) notify the Architect that the initial Claim stands. 4.4.4 If a Claim has not been resolved after consideration of the foregoing and of further evidence presented by the parties or requested by the Architect, the Architect will notify the parties in writing that the Architect's decision will be made within seven days, which decision shall be final and binding on the parties but subject to arbitration. Upon expiration of such time period, the Architect will render to the parties the Architect's written decision relative to the Claim, including any change in the Contract Sum or Contract Time or both. If there is a surety and there appears to be a possibility of a Contractor's default, the Architect may but is not obligated to notify the surety and request the surety s assistance in resolving the controversy 4.5 ARBITRATION 4.5.1 Controversies and Claims Subject to Arbitration. Any controversy or Claim arising out of or related to the Contract, or the breach thereof shall be settled by arbitration in accor dance with the Construction Industry Arbitration Rules of the American Arbitration Association, and judgment upon the award rendered by the arbitrator or arbitrators may be entered in any court having jurisdiction thereof, except controversies or Claims relating to aesthetic effect and except those waived as provided for in Subparagraph 4 3 5 Such controversies or Claims upon which the Architect has given notice and rendered a decision as provided in Subparagraph 4 4 4 shall be subject to arbitration upon written demand of either party Arbitration may be commenced when 45 days have passed after a Claim has been referred to the Architect as provided in Paragraph 4.3 and no decision has been rendered. AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. 4.5.2 Rules and Notices for Arbitration. Claims between the Owner and Contractor not resolved under Paragraph 4 4 shall, if subject to arbitration under Subparagraph 4 5 1 be decided by arbitration in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association cur rently in effect, unless the parties mutually agree otherwise. Notice of demand for arbitration shall be filed in writing with the other party to the Agreement between the Owner and Con- tractor and with the American Arbitration Association, and a copy shall be filed with the Architect. 4.5.3 Contract Performance During Arbitration. During arbi- tration proceedings, the Owner and Contractor shall comply with Subparagraph 4.3 4 4.5.4 When Arbitration May Be Demanded. Demand for arbi- tration of any Claim may not be made until the earlier of (1) the date on which the Architect has rendered a final written deci- sion on the Claim, (2) the tenth day after the parties have pre sented evidence to the Architect or have been given reasonable opportunity to do so if the Architect has not rendered a final written decision by that date, or (3) any of the five events described in Subparagraph 4 3.2 4.5.4.1 When a written decision of the Architect states that (1) the decision is final but subject to arbitration and (2) a demand for arbitration of a Claim covered by such decision must be made within 30 days after the date on which the party making the demand receives the final written decision, then failure to demand arbitration within said 30 days period shall result in the Architect's decision becoming final and binding upon the Owner and Contractor If the Architect renders a decision after arbitration proceedings have been initiated, such decision may be entered as evidence, but shall not supersede arbitration pro- ceedings unless the decision is acceptable to all parties concerned. 4.5.4.2 A demand for arbitration shall be made within the time limits specified in Subparagraphs 4 5 1 and 4 5 4 and Clause 4 5 4 1 as applicable, and in other cases within a reasonable time after the Claim has arisen, and in no event shall it be made after the date when institution of legal or equitable proceedings based on such Claim would be barred by the applicable statute of limitations as determined pursuant to Paragraph 13 7 4.5.5 Limitation on Consolidation or Joinder No arbitration arising out of or relating to the Contract Documents shall include, by consolidation or joinder or in any other manner the Architect, the Architect s employees or consultants, except by written consent containing specific reference to the Agree ment and signed by the Architect, Owner Contractor and any other person or entity sought to be joined. No arbitration shall include, by consolidation or joinder or in any other manner parties other than the Owner Contractor a separate contrac tor as described in Article 6 and other persons substantially involved in a common question of fact or law whose presence is required if complete relief is to be accorded in arbitration. No person or entity other than the Owner Contractor or a separate contractor as described in Article 6 shall be included as an orig- inal third party or additional third party to an arbitration whose interest or responsibility is insubstantial. Consent to arbitration involving an additional person or entity shall not constitute consent to arbitration of a dispute not described therein or with a person or entity not named or described therein. The fore going agreement to arbitrate and other agreements to arbitrate with an additional person or entity duly consented to by parties to the Agreement shall be specifically enforceable under appli- cable law in any court having jurisdiction thereof 4.5.6 Claims and Timely Assertion of Claims. A party who files a notice of demand for arbitration must assert in the demand all Claims then known to that party on which arbitra- tion is permitted to be demanded. When a party fails to include a Claim through oversight, inadvertence or excusable neglect, or when a Claim has matured or been acquired subsequently the arbitrator or arbitrators may permit amendment. 4.5.7 Judgment on Final Award. The award rendered by the arbitrator or arbitrators shall be final, and judgment may be entered upon it in accordance with applicable law in any court having jurisdiction thereof. ARTICLE 5 SUBCONTRACTORS 5.1 DEFINITIONS 5.1 1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the Work at the site. The term 'Subcontractor' is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or an authorized representative of the Subcon- tractor The term 'Subcontractor' does not include a separate contractor or subcontractors of a separate contractor 5.1.2 A Sub subcontractor is a person or entity who has a direct or indirect contract with a Subcontractor to perform a portion of the Work at the site. The term `Sub- subcontractor' is referred to throughout the Contract Documents as if singular in number and means a Sub subcontractor or an authorized representative of the Sub subcontractor 5.2 AWARD OF SUBCONTRACTS AND OTHER CONTRACTS FOR PORTIONS OF THE WORK 5.2.1 Unless otherwise stated in the Contract Documents or the bidding requirements, the Contractor as soon as prac ticable after award of the Contract, shall furnish in writing to the Owner through the Architect. the names of persons or enti- ties (including those who are to furnish materials or equipment fabricated to a special design) proposed for each principal por tion of the Work. The Architect will promptly reply to the Con- tractor in writing stating whether or not the Owner or the Architect, after due investigation, has reasonable objection to any such proposed person or entity Failure of the Owner or Architect to reply promptly shall constitute notice of no reason- able objection. 5.2.2 The Contractor shall not contract with a proposed per son or entity to whom the Owner or Architect has made rea- sonable and timely objection. The Contractor shall not be required to contract with anyone to whom the Contractor has made reasonable objection. 5.2.3 If the Owner or Architect has reasonable objection to a person or entity proposed by the Contractor the Contractor shall propose another to whom the Owner or Architect has no reasonable objection. The Contract Sum shall be increased or decreased by the difference in cost occasioned by such change and an appropriate Change Order shall be issued. However no increase in the Contract Sum shall be allowed for such change unless the Contractor has acted promptly and responsively in submitting names as required. 5.2.4 The Contractor shall not change a Subcontractor person or entity previously selected if the Owner or Architect makes reasonable objection to such change. AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 13 5.3 SUBCONTRACTUAL RELATIONS 5.3.1 By appropriate agreement, written where legally required for validity the Contractor shall require each Subcontractor to the extent of the Work to be performed by the Subcontractor to be bound to the Contractor by terms of the Contract Docu- ments, and to assume toward the Contractor all the obligations and responsibilities which the Contractor by these Docu- ments, assumes toward the Owner and Architect. Each subcon- tract agreement shall preserve and protect the rights of the Owner and Architect under the Contract Documents with respect to the Work to be performed by the Subcontractor so that subcontracting thereof will not prejudice such rights, and shall allow to the Subcontractor unless specifically provided otherwise in the subcontract agreement, the benefit of all rights, remedies and redress against the Contractor that the Contractor by the Contract Documents, has against the Owner Where appropriate, the Contractor shall require each Subcontractor to enter into similar agreements with Sub -sub- contractors. The Contractor shall make available to each pro- posed Subcontractor prior to the execution of the subcontract agreement, copies of the Contract Documents to which the Subcontractor will be bound, and, upon written request of the Subcontractor identify to the Subcontractor terms and condi- tions of the proposed subcontract agreement which may be at variance with the Contract Documents. Subcontractors shall similarly make copies of applicable portions of such documents available to their respective proposed Sub subcontractors. 5.4 CONTINGENT ASSIGNMENT OF SUBCONTRACTS 5.4.1 Each subcontract agreement for a portion of the Work is assigned by the Contractor to the Owner provided that. 1 assignment is effective only after termination of the Contract by the Owner for cause pursuant to Para- graph 14.2 and only for those subcontract agreements which the Owner accepts by notifying the Subcon- tractor in writing, and .2 assignment is subject to the prior rights of the surety if any obligated under bond relating to the Contract. 5.4.2 If the Work has been suspended for more than 30 days, the Subcontractor s compensation shall be equitably adjusted. ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS 6.1 OWNER'S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE CONTRACTS 6.1 1 The Owner reserves the right to perform construction or operations related to the Project with the Owner's own forces, and to award separate contracts in connection with other por tions of the Project or other construction or operations on the site under Conditions of the Contract identical or substantially similar to these including those portions related to insurance and waiver of subrogation. If the Contractor claims that delay or additional cost is involved because of such action by the Owner the Contractor shall make such Claim as provided else where in the Contract Documents. 6.1.2 When separate contracts are awarded for different por tions of the Project or other construction or operations on the site, the term Contractor' in the Contract Documents in each case shall mean the Contractor who executes each separate Owner Contractor Agreement. 14 A201 1987 6.1.3 The Owner shall provide for coordination of the activi- ties of the Owner's own forces and of each separate contractor with the Work of the Contractor who shall cooperate with them. The Contractor shall participate with other separate con- tractors and the Owner in reviewing their construction sched- ules when directed to do so The Contractor shall make any revisions to the construction schedule and Contract Sum deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the Contractor separate contractors and the Owner until subsequently revised. 6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations related to the Project with the Owner's own forces, the Owner shall be deemed to be subject to the same obligations and to have the same rights which apply to the Contractor under the Condi- tions of the Contract, including, without excluding others, those stated in Article 3 this Article 6 and Articles 10 11 and 12 6.2 MUTUAL RESPONSIBILITY 6.2.1 The Contractor shall afford the Owner and separate con- tractors reasonable opportunity for introduction and storage of their materials and equipment and performance of their activi- ties and shall connect and coordinate the Contractor's con- struction and operations with theirs as required by the Contract Documents. 6.2.2 If part of the Contractor's Work depends for proper execution or results upon construction or operations by the Owner or a separate contractor the Contractor shall, prior to proceeding with that portion of the Work, promptly report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable for such proper execution and results. Failure of the Contractor so to report shall constitute an acknowledgment that the Owner's or sepa- rate contractors completed or partially completed construction is fit and proper to receive the Contractor's Work, except as to defects not then reasonably discoverable. 6.2.3 Costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsi- ble therefor 6.2.4 The Contractor shall promptly remedy damage wrong- fully caused by the Contractor to completed or partially com- pleted construction or to property of the Owner or separate contractors as provided in Subparagraph 10.2 5 6.2.5 Claims and other disputes and matters in question between the Contractor and a separate contractor shall be sub- ject to the provisions of Paragraph 4.3 provided the separate contractor has reciprocal obligations. 6.2.6 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are described for the Contractor in Paragraph 3 14 6.3 OWNER'S RIGHT TO CLEAN UP 6.3.1 If a dispute arises among the Contractor separate con- tractors and the Owner as to the responsibility under their respective contracts for maintaining the premises and surround- ing area free from waste materials and rubbish as described in Paragraph 3 15 the Owner may clean up and allocate the cost among those responsible as the Architect determines to be just. AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. ARTICLE 7 CHANGES IN THE WORK 7 1 CHANGES 7 1 1 Changes in the Work may be accomplished after execu- tion of the Contract, and without invalidating the Contract, by Change Order Construction Change Directive or order for a minor change in the Work, subject to the limitations stated in this Article 7 and elsewhere in the Contract Documents. 7 1.2 A Change Order` shall be based upon agreement among the Owner Contractor and Architect, a Construction Change Directive requires agreement by the Owner and Architect and may or may not be agreed to by the Contractor• an order for a minor change in the Work may be issued by the Architect alone. 7 1.3 Changes in the Work shall be performed under appli- cable provisions of the Contract Documents, and the Contrac tor shall proceed promptly unless otherwise provided in the Change Order Construction Change Directive or order for a minor change in the Work. 7 1.4 If unit prices are stated in the Contract Documents or subsequently agreed upon, and if quantities originally con- templated are so changed in a proposed Change Order or Con- struction Change Directive that application of such unit prices to quantities of Work proposed will cause substantial inequity to the Owner or Contractor the applicable unit prices shall be equitably adjusted. 7.2 CHANGE ORDERS 7.2.1 A Change Order is a written instrument prepared by the Architect and signed by the Owner Contractor and Architect, stating their agreement upon all of the following. 1 a change in the Work, .2 the amount of the adjustment in the Contract Sum, if any and .3 the extent of the adjustment in the Contract Time, if any 7.2.2 Methods used in determining adjustments to the Contract Sum may include those listed in Subparagraph 7 3 3 7.3 CONSTRUCTION CHANGE DIRECTIVES 7.3.1 A Construction Change Directive is a written order pre pared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any in the Contract Sum or Contract Time, or both The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of addi- tions, deletions or other revisions, the Contract Sum and Con- tract Time being adjusted accordingly 7.3.2 A Construction Change Directive shall be used in the absence of total agreement on the terms of a Change Order 7.3.3 If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment shall be based on one of the following methods. 1 mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to per mit evaluation, .2 unit prices stated in the Contract Documents or sub- sequently agreed upon, .3 cost to be determined in a manner agreed upon by the parties and a mutually acceptable fixed or percent age fee; or .4 as provided in Subparagraph 7 3 6 7.3.4 Upon receipt of a Construction Change Directive, the Contractor shall promptly proceed with the change in the Work involved and advise the Architect of the Contractor's agreement or disagreement with the method, if any provided in the Construction Change Directive for determining the pro- posed adjustment in the Contract Sum or Contract Time. 7.3.5 A Construction Change Directive signed by the Contrac tor indicates the agreement of the Contractor therewith, includ- ing adjustment in Contract Sum and Contract Time or the method for determining them. Such agreement shall be effec tive immediately and shall be recorded as a Change Order 7.3.6 If the Contractor does not respond promptly or disagrees with the method for adjustment in the Contract Sum, the method and the adjustment shall be determined by the Archi- tect on the basis of reasonable expenditures and savings of those performing the Work attributable to the change, includ- ing, in case of an increase in the Contract Sum, a reasonable allowance for overhead and profit. In such case, and also under Clause 7 3 3 3 the Contractor shall keep and present, in such form as the Architect may prescribe, an itemized accounting together with appropriate supporting data. Unless otherwise provided in the Contract Documents, costs for the purposes of this Subparagraph 7 3 6 shall be limited to the following. 1 costs of labor including social security old age and unemployment insurance, fringe benefits required by agreement or custom, and workers or workmen s compensation insurance; .2 costs of materials, supplies and equipment, includ- ing cost of transportation, whether incorporated or consumed, .3 rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others; .4 costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the Work, and .5 additional costs of supervision and field office person- nel directly attributable to the change. 7.3.7 Pending final determination of cost to the Owner amounts not in dispute may be included in Applications for Payment. The amount of credit to be allowed by the Contrac tor to the Owner for a deletion or change which results in a net decrease in the Contract Sum shall be actual net cost as con- firmed by the Architect. When both additions and credits covering related Work or substitutions are involved in a change, the allowance for overhead and profit shall be figured on the basis of net increase, if any with respect to that change. 7.3.8 If the Owner and Contractor do not agree with the adjustment in Contract Time or the method for determining it, the adjustment or the method shall be referred to the Architect for determination. 7.3.9 When the Owner and Contractor agree with the deter mination made by the Architect concerning the adjustments in the Contract Sum and Contract Time, or otherwise reach agree ment upon the adjustments, such agreement shall be effective immediately and shall be recorded by preparation and execu- tion of an appropriate Change Order MA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA 1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 15 7.4 MINOR CHANGES IN THE WORK 7 4.1 The Architect will have authority to order minor changes in the Work not involving adjustment in the Contract Sum or extension of the Contract Time and not inconsistent with the intent of the Contract Documents. Such changes shall be effected by written order and shall be binding on the Owner and Contractor The Contractor shall carry out such written orders promptly 16 A201 1987 ARTICLE 8 TIME 8.1 DEFINITIONS 8.1 1 Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, allotted in the Con- tract Documents for Substantial Completion of the Work. 8.1.2 The date of commencement of the Work is the date established in the Agreement. The date shall not be postponed by the failure to act of the Contractor or of persons or entities for whom the Contractor is responsible. 8.1.3 The date of Substantial Completion is the date certified by the Architect in accordance with Paragraph 9 8 8.1.4 The term day as used in the Contract Documents shall mean calendar day unless otherwise specifically defined. 8.2 PROGRESS AND COMPLETION 8.2.1 Time limits stated in the Contract Documents are of the essence of the Contract. By executing the Agreement the Con- tractor confirms that the Contract Time is a reasonable period for performing the Work. 8.2.2 The Contractor shall not knowingly except by agree ment or instruction of the Owner in writing, prematurely com- mence operations on the site or elsewhere prior to the effective date of insurance required by Article 11 to be furnished by the Contractor The date of commencement of the Work shall not be changed by the effective date of such insurance. Unless the date of commencement is established by a notice to proceed given by the Owner the Contractor shall notify the Owner in writing not less than five days or other agreed period before commencing the Work to permit the timely filing of mortgages, mechanic s liens and other security interests. 8.2.3 The Contractor shall proceed expeditiously with ade quate forces and shall achieve Substantial Completion within the Contract Time. 8.3 DELAYS AND EXTENSIONS OF TIME 8.3.1 If the Contractor is delayed at any time in progress of the Work by an act or neglect of the Owner or Architect, or of an employee of either or of a separate contractor employed by the Owner or by changes ordered in the. Work, or by labor disputes, fire, unusual delay in deliveries, unavoidable casualties or other causes beyond the Contractor s control, or by delay authorized by the Owner pending arbitration, or by other causes which the Architect determines may justify delay then the Contract Time shall be extended by Change Order for such reasonable time as the Architect may determine. 8.3.2 Claims relating to time shall be made in accordance with applicable provisions of Paragraph 4.3 8.3.3 This Paragraph 8.3 does not preclude recovery of dam- ages for delay by either party under other provisions of the Contract Documents. ARTICLE 9 PAYMENTS AND COMPLETION 9.1 CONTRACT SUM 9.1 1 The Contract Sum is stated in the Agreement and, includ- ing authorized adjustments, is the total amount payable by the Owner to the Contractor for performance of the Work under the Contract Documents. 9.2 SCHEDULE OF VALUES 9.2.1 Before the first Application for Payment, the Contractor shall submit to the Architect a schedule of values allocated to various portions of the Work, prepared in such form and sup- ported by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor s Applica- tions for Payment. 9.3 APPLICATIONS FOR PAYMENT 9.3.1 At least ten days before the date established for each progress payment, the Contractor shall submit to the Architect an itemized Application for Payment for operations completed in accordance with the schedule of values. Such application shall be notarized, if required, and supported by such data substantiating the Contractor's right to payment as the Owner or Architect may require, such as copies of requisitions from Subcontractors and material suppliers, and reflecting retainage if provided for elsewhere in the Contract Documents. 9.3.1 1 Such applications may include requests for payment on account of changes in the Work which have been properly authorized by Construction Change Directives but not yet included in Change Orders. 9.3.1.2 Such applications may not include requests for pay ment of amounts the Contractor does not intend to pay to a Subcontractor or material supplier because of a dispute or other reason. 9.3.2 Unless otherwise provided in the Contract Documents, payments shall be made on account of materials and equipment delivered and suitably stored at the site for subsequent incor poration in the Work. If approved in advance by the Owner payment may similarly be made for materials and equipment suitably stored off the site at a location agreed upon in writing. Payment for materials and equipment stored on or off the site shall be conditioned upon compliance by the Contractor with procedures satisfactory to the Owner to establish the Owner s title to such materials and equipment or otherwise protect the Owner s interest, and shall include applicable insurance, storage and transportation to the site for such materials and equipment stored off the site. 9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass to the Owner no later than the time of payment. The Contractor further warrants that upon submittal of an Application for Payment all Work for which Certificates for Payment have been previously issued and payments received from the Owner shall, to the best of the Contractor's knowledge, information and belief, be free and clear of liens, claims, security interests or encumbrances in favor of the Contractor Subcontractors, material suppliers, or other persons or entities making a claim by reason of having provided labor materials and equipment relating to the Work. 9.4 CERTIFICATES FOR PAYMENT 9.4 1 The Architect will, within seven days after receipt of the Contractor's Application for Payment, either issue to the AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION fOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. Owner a Certificate for Payment, with a copy to the Contrac tor for such amount as the Architect determines is properly due, or notify the Contractor and Owner in writing of the Architect's reasons for withholding certification in whole or in part as provided in Subparagraph 9 5 1 9.4.2 The issuance of a Certificate for Payment will constitute a representation by the Architect to the Owner based on the Architect's observations at the site and the data comprising the Application for Payment, that the Work has progressed to the point indicated and that, to the best of the Architect s knowl- edge, information and belief, quality of the Work is in accor dance with the Contract Documents. The foregoing representa- tions are subject to an evaluation of the Work for conformance with the Contract Documents upon Substantial Completion, to results of subsequent tests and inspections, to minor deviations from the Contract Documents correctable prior to completion and to specific qualifications expressed by the Architect. The issuance of a Certificate for Payment will further constitute a representation that the Contractor is entitled to payment in the amount certified. However the issuance of a Certificate for Pay ment will not be a representation that the Architect has (1) made exhaustive or continuous on -site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by the Owner to substantiate the Contractor's right to payment or (4) made examination to ascertain how or for what purpose the Contrac tor has used money previously paid on account of the Contract Sum. 9.5 DECISIONS TO WITHHOLD CERTIFICATION 9.5.1 The Architect may decide not to certify payment and may withhold a Certificate for Payment in whole or in part, to the extent reasonably necessary to protect the Owner if in the Architect's opinion the representations to the Owner required by Subparagraph 9 4.2 cannot be made. If the Architect is unable to certify payment in the amount of the Application, the Architect will notify the Contractor and Owner as provided in Subparagraph 9 4 1 If the Contractor and Architect cannot agree on a revised amount, the Architect will promptly issue a Certificate for Payment for the amount for which the Architect is able to make such representations to the Owner The Archi- tect may also decide not to certify payment or because of subsequently discovered evidence or subsequent observations, may nullify the whole or a part of a Certificate for Payment previously issued, to such extent as may be necessary in the Architect s opinion to protect the Owner from loss because of. 1 defective Work not remedied, .2 third party claims filed or reasonable evidence indicat ing probable filing of such claims, 3 failure of the Contractor to make payments prop- erly to Subcontractors or for labor materials or equipment, 4 reasonable evidence that the Work cannot be com- pleted for the unpaid balance of the Contract Sum, .5 damage to the Owner or another contractor 6 reasonable evidence that the Work will not be com- pleted within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay or 7 persistent failure to carry out the Work in accordance with the Contract Documents. 9.5.2 When the above reasons for withholding certification are removed, certification will be made for amounts previously withheld. 9.6 PROGRESS PAYMENTS 9.6.1 After the Architect has issued a Certificate for Payment, the Owner shall make payment in the manner and within the time provided in the Contract Documents, and shall so notify the Architect. 9.6.2 The Contractor shall promptly pay each Subcontractor upon receipt of payment from the Owner out of the amount paid to the Contractor on account of such Subcontractor's por tion of the Work, the amount to which said Subcontractor is entitled, reflecting percentages actually retained from payments to the Contractor on account of such Subcontractor's portion of the Work. The Contractor shall, by appropriate agreement with each Subcontractor require each Subcontractor to make payments to Sub subcontractors in similar manner 9.6.3 The Architect will, on request, furnish to a Subcontrac tor if practicable, information regarding percentages of com- pletion or amounts applied for by the Contractor and action taken thereon by the Architect and Owner on account of por tions of the Work done by such Subcontractor 9.6.4 Neither the Owner nor Architect shall have an obligation to pay or to see to the payment of money to a Subcontractor except as may otherwise be required by law 9.6.5 Payment to material suppliers shall be treated in a manner similar to that provided in Subparagraphs 9 6.2 9 6.3 and 9 6.4 9.6.6 A Certificate for Payment, a progress payment, or partial or entire use or occupancy of the Project by the Owner shall not constitute acceptance of Work not in accordance with the Contract Documents. 9.7 FAILURE OF PAYMENT 9.7 1 If the Architect does not issue a Certificate for Payment, through no fault of the Contractor within seven days after receipt of the Contractor's Application for Payment, or if the Owner does not pay the Contractor within seven days after the date established in the Contract Documents the amount cer tified by the Architect or awarded by arbitration, then the Con- tractor may upon seven additional days written notice to the Owner and Architect, stop the Work until payment of the amount owing has been received. The Contract Time shall be extended appropriately and the Contract Sum shall be increased by the amount of the Contractor's reasonable costs of shut -down, delay and start -up which shall be accomplished as provided in Article 7 9.8 'SUBSTANTIAL COMPLETION 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is suffi- ciently complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. 9.8.2 When the Contractor considers that the Work, or a por tion thereof which the Owner agrees to accept separately is substantially complete, the Contractor shall prepare and submit to the Architect a comprehensive list of items to be completed or corrected. The Contractor shall proceed promptly to com- plete and correct items on the list. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Docu- ments. Upon receipt of the Contractor's list, the Architect will make an inspection to determine whether the Work or desig- AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA° ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 17 nated portion thereof is substantially complete. If the Architect's inspection discloses any item, whether or not included on the Contractor's list, which is not in accordance with the requirements of the Contract Documents, the Contrac tor shall, before issuance of the Certificate of Substantial Com- pletion, complete or correct such item upon notification by the Architect. The Contractor shall then submit a 'request for another inspection by the Architect to determine Substantial Completion. When the Work or designated portion thereof is substantially complete, the Architect will prepare a Certificate of Substantial Completion which shall establish the date of Sub- stantial Completion, shall establish responsibilities of the Owner and Contractor for security maintenance, heat, utilities, damage to the. Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Con- tract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Comple tion. The Certificate of Substantial Completion shall be sub- mitted to the Owner and Contractor for their written accep- tance of responsibilities assigned to them in such Certificate. 9.8.3 Upon Substantial Completion of the Work or designated portion thereof and upon application by the Contractor ,and certification by the Architect, the Owner shall make payment, reflecting adjustment in retainage, if any for such Work or por tion thereof as provided in the Contract Documents. 9.9 PARTIAL OCCUPANCY OR USE 9.9.1 The Owner may occupy or use any completed or par tially completed portion of the Work at any stage when such portion is designated by separate agreement with the Contrac tor provided such occupancy or use is consented to by the insurer as required under Subparagraph 11 3 11 and authorized by public authorities having jurisdiction over the Work. Such partial occupancy or use may commence whether or not the portion• is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage if any secu- rity maintenance, heat, utilities, damage to the Work and insur ance, and have agreed in writing concerning the period for cor rection of the Work and commencement of warranties required by the Contract Documents. When the Contractor considers a portion substantially complete, the Contractor shall prepare and submit a list to the Architect as provided under Subparagraph 9.8.2 Consent of the Contractor to partial occu- pancy or use shall not be unreasonably withheld. The stage of the progress of the Work shall be determined by written agree ment between the Owner and Contractor or if no agreement is reached, by decision of the Architect. 9.9.2 Immediately prior to such partial occupancy or use, the Owner Contractor and Architect shall jointly inspect the area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work. 9.9.3 Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work shall not constitute accep- tance of Work not complying with the requirements of the Contract Documents. 9.10 FINAL COMPLETION AND FINAL PAYMENT 9.10.1 Upon receipt of written notice that the Work is ready for final inspection and acceptance and upon receipt of a final Application for Payment, the Architect will promptly make 18 A201 1987 such inspection and, when the Architect finds the Work accept able under the Contract Documents and the Contract fully per formed, the Architect will promptly issue a final Certificate for Payment stating that to the best of the Architect s knowledge, information and belief, and on the basis of the Architect's observations and inspections, the Work has been completed in accordance with terms and conditions of the Contract Docu- ments and that the entire balance found to be due the Contrac tor and noted in said final Certificate is due and payable. The Architect's final Certificate for Payment will constitute a further representation that conditions listed in Subparagraph 9 10.2 as precedent to the Contractor's being entitled to final payment have been fulfilled. 9.10.2 Neither final payment nor any remaining retained percentage shall become due until the Contractor submits to the Architect (1) an affidavit that payrolls, bills for materials and equipment, and other indebtedness connected with the Work for which the Owner or the Owner's property might be responsible or encumbered (less amounts withheld by Owner) have been paid or otherwise satisfied, (2) a certificate evidenc ing that insurance required by the Contract Documents to remain in force after final payment is currently in effect and will not be cancelled or allowed to expire until at least 30 days prior written notice has been given to the Owner (3) a written statement that the Contractor knows of no substantial reason that the insurance will not be renewable to cover the period required by the Contract Documents, (4) consent of surety if any to final payment and (5), if required by the Owner other data establishing payment or satisfaction of obligations, such as receipts, releases and waivers of liens, claims, security interests or encumbrances arising out of the Contract, to the extent and in such form as may be designated by the Owner If a Subcon- tractor refuses to furnish a release or waiver required by the Owner the Contractor may furnish a bond satisfactory to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after paymerits are made, the Contractor shall refund to the Owner all money that the Owner niay be compelled to pay in discharging such lien, including all costs and reasonable attorneys fees 9.10.3 If, after Substantial Completion of the Work, final com- pletion. thereof is materially delayed through no fault of the Contractor or by issuance of Change Orders affecting final completion, and the Architect so confirms, the Owner shall, upon application by the Contractor and certification by the Architect, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance for Work not fully com- pleted or corrected is less than retainage stipulated in the Con- tract Documents, and if bonds have been furnished, the written consent of surety to payment of the balance due for that por tion of'the Work fully completed and accepted shall be submit ted by the Contractor to the Architect prior to certification of such payment. Such payment shall be made under terms and conditions governing final payment, except that it shall not constitute a waiver of claims. The making of final payment shall constitute a waiver of claims by the Owner as provided in Sub- paragraph 4.3 5 9.10.4 Acceptance of final payment by the Contractor a Sub- contractor or material supplier shall constitute' a waiver of claims by that payee except those previously made in writing and identified by that payee as unsettled' at the time of final Application for Payment. Such waivers shall be in addition to the waiver described in .Subparagraph 4 3.5 AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY 10.1 SAFETY PRECAUTIONS AND PROGRAMS 10.1 1 The Contractor shall be responsible for initiating, main- taining and supervising all safety precautions and programs in connection with the performance of the Contract. 10.1.2 In the event the Contractor encounters on the site. material reasonably believed to be asbestos or polychlorinated biphenyl (PCB) which has not been rendered harmless, the Contractor shall immediately stop Work in the area affected and report the condition to the Owner and Architect in writing. The Work in the affected area shall not thereafter be resumed except by written agreement of the Owner and Contractor if in fact the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless. The Work in the affected area shall be resumed in the absence of asbestos or polychlori- nated biphenyl (PCB), or when it has been rendered harmless, by written agreement of the Owner and Contractor or in accordance with final determination by the Architect on which arbitration has not been demanded, or by arbitration under Article 4 10.1.3 The Contractor shall not be required pursuant to Article 7 to perform without consent any Work relating to asbestos or polychlorinated biphenyl (PCB). 10.1.4 To the fullest extent permitted by law the Owner shall indemnify and hold harmless the Contractor Architect, Archi- tect s consultants and agents and employees of any of them from and against claims, damages, losses and expenses, includ- ing but not limited to attorneys' fees, arising out of or resulting from performance of the Work in the affected area if in fact the material is asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless, provided that such claim, damage, loss or expense is attributable to bodily injury sickness, disease or death, or to injury to or destruction of tangible property (other than the Work itself) including loss of use resulting therefrom, but only to the extent caused in whole or in part by negligent acts or omissions of the Owner anyone directly or indirectly employed by the Owner or anyone for whose acts the Owner may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Subparagraph 10 1 4 10.2 SAFETY OF PERSONS AND PROPERTY 10.2.1 The Contractor shall take reasonable precautions for safety of and shall provide reasonable protection to prevent damage, injury or loss to 1 employees on the Work and other persons who may be affected thereby .2 the Work and materials and equipment to be incorpo- rated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor s Subcontractors or Sub- subcontrac tors, and .3 other property at the site or adjacent thereto such -as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relo- cation or replacement in the course of construction. 10.2.2 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulations and lawful orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of the Contract, reason- able safeguards for safety and protection, including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying owners and users of adjacent sites and utilities. 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual methods are necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activities under supervision of properly qualified personnel. 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property insurance required by the Contract Documents) to property referred to in Clauses 10.2 1.2 and 10.2 1 3 caused in whole or in part by the Contractor a Subcontractor a Sub subcontractor or anyone directly or indirectly employed by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsible under Clauses 10.2 1.2 and 10.2 1 3 except damage or loss attributable to acts or omissions of the Owner or Architect or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, and not attributable to the fault or negligence of the Contractor The foregoing obligations of the Contractor are in addition to the Contractor's obligations under Paragraph 3 18 10.2.6 The Contractor shall designate a responsible member of the Contractor's organization at the site whose duty shall be the prevention of accident's. This person shall be the Contractor's superintendent unless otherwise designated by the Contractor in writing to the Owner and Architect. 10.2.7 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its safety 10.3 EMERGENCIES 10.3.1 In an emergency affecting safety of persons or property the Contractor shall act, at the Contractor's discretion, to pre vent threatened damage, injury or loss. Additional compensa- tion or extension of time claimed by the Contractor on account of an emergency shall be determined as provided in Paragraph 4.3 and Article 7 ARTICLE 11 INSURANCE AND BONDS 11 1 CONTRACTOR'S LIABILITY INSURANCE 11 1 1 The Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor s operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable: 1 claims under workers or workmen s compensation, disability benefit and other similar employee benefit acts which are applicable to the Work to be performed; AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 'WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 19 .2 claims for damages because of bodily injury occupa- tional sickness or disease, or death of the Contractor's employees; .3 claims for damages because of bodily injury sickness or disease, or death of any person other than the Con- tractor's employees, .4 claims for damages insured by usual personal injury liability coverage which are sustained (1) by a person as a result of an offense directly or indirectly related to employment of such person by the Contractor or (2) by another person, 5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible prop- erty including loss of use resulting therefrom, 6 claims for damages because of bodily injury death of a person or property damage arising out of owner ship maintenance or use of a motor vehicle; and 7 claims involving contractual liability insurance appli- cable to the Contractor's obligations under Paragraph 3 18 11 1.2 The insurance required by Subparagraph 11 1 1 shall be written for not less than limits of liability specified in the Con- tract Documents or required by law whichever coverage is greater Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption from date of commencement of the Work until date of final payment and termination of any coverage required to be main- tained after final payment. 11 1.3 Certificates of Insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the Work. These Certificates and the insurance policies required by this Paragraph 11 1 shall contain a provision that coverages afforded under the policies will not be cancelled or allowed to expire until at least 30 days prior written notice has been given to the Owner If any of the foregoing insurance coverages are required to remain in force after final payment and are reason- ably available, an additional certificate evidencing continuation of such coverage shall be submitted with the final Application for Payment as required by Subparagraph 9 10.2 Information concerning reduction of coverage shall be furnished by the Contractor with reasonable promptness in accordance with the Contractor's information and belief. 11.2 OWNER'S LIABILITY INSURANCE 11.2.1 The Owner shall be responsible for purchasing and maintaining the Owner's usual liability insurance. Optionally the Owner may purchase and maintain other insurance for self protection against claims which may arise from operations under the Contract. The Contractor shall not be responsible for purchasing and maintaining this optional Owner's liability insurance unless specifically required by the Contract Documents. 11.3 PROPERTY INSURANCE 11.3.1 Unless otherwise provided, the Owner shall purchase and maintain, in a company or companies lawfully authorized to do business in the jurisdiction in which the Project is located, property insurance in the amount of the initial Con- tract Sum as well as subsequent modifications thereto for the entire Work at the site on a replacement cost basis without vol- untary deductibles. Such property insurance shall be main- tained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until final payment has been made as provided in Paragraph 9 10 or until no person or entity 20 A201 1987 other than the Owner has an insurable interest in the property required by this Paragraph 11 3 to be covered, whichever is earlier This insurance shall include interests of the Owner the Contractor Subcontractors and Sub subcontractors in the Work. 11.3.1 1 Property insurance shall be on an all -risk policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including, without duplication of coverage, theft, vandalism, malicious mischief, collapse, false work, temporary buildings and debris removal including demolition occasioned by enforcement of any applicable legal requirements, and shall cover reasonable compensation for Architect s services and expenses required as a result of such insured loss. Coverage for other perils shall not be required unless otherwise provided in the Contract Documents. 11.3.1.2 If the Owner does not intend to purchase such prop- erty insurance required by the Contract and with all of the coverages in the amount described above, the Owner shall so inform the Contractor in writing prior to commencement of the Work. The Contractor may then effect insurance which will protect the interests of the Contractor Subcontractors and Sub subcontractors in the Work, and by appropriate Change Order the cost thereof shall be charged to the Owner If the Contrac tor is damaged by the failure or neglect of the Owner to pur chase or maintain insurance as described above, without so notifying the Contractor then the Owner shall bear all reason- able costs properly attributable thereto 11.3.1.3 If the property insurance requires minimum deducti- bles and such deductibles are identified in the Contract Docu- ments, the Contractor shall pay costs not covered because of such deductibles. If the Owner or insurer increases the required minimum deductibles above the amounts so identified or if the Owner elects to purchase this insurance with voluntary deduc tible amounts, the Owner shall be responsible for payment of the additional costs not covered because of such increased or voluntary deductibles. If deductibles are not identified in the Contract Documents, the Owner shall pay costs not covered because of deductibles. 11.3.1.4 Unless otherwise provided in the Contract Docu- ments, this property insurance shall cover portions of the Work stored off the site after written approval of the Owner at the value established in the approval, and also portions of the Work in transit. 11.3.2 Boiler and Machinery Insurance. The Owner shall purchase and maintain boiler and machinery insurance required by the Contract Documents or by law which shall specifically cover such insured objects during installation and until final acceptance by the Owner• this insurance shall include interests of the Owner Contractor Subcontractors and Sub subcontractors in the Work, and the Owner and. Contractor shall be named insureds. 11.3.3 Loss of Use Insurance. The Owner at the Owner's option, may purchase and maintain such insurance as will insure the Owner against Toss of use of the Owner's property due to fire or other hazards, however caused. The Owner waives all rights of action against the Contractor for loss of use of the Owner's property including consequential losses due to fire or other hazards however caused. 11.3.4 If the Contractor requests in writing that insurance for risks other than those described herein or for other special haz ards be included in the property insurance policy the Owner shall, if possible, include such insurance, and the cost thereof shall be charged to the Contractor by appropriate Change Order AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. 11.3.5 If during the Project construction period the Owner insures properties, real or personal or both, adjoining or adja- cent to the site by property insurance under policies separate from those insuring the Project, or if after final payment prop- erty insurance is to be provided on the completed Project through a policy or policies other than those insuring the Proj- ect during the construction period, the Owner shall waive all rights in accordance with the terms of Subparagraph 11.3 7 for damages caused by fire or other perils covered by this separate property insurance. All separate policies shall provide this waiver of subrogation by endorsement or otherwise. 11.3.6 Before an exposure to loss may occur the Owner shall file with the Contractor a copy of each policy that includes insurance coverages required by this Paragraph 11.3 Each policy shall contain all generally applicable conditions, defini- tions, exclusions and endorsements related to this Project. Each policy shall contain a provision that the policy will not be cancelled or allowed to expire until at least 30 days' prior writ ten notice has been given to the Contractor 11.3.7 Waivers of Subrogation. The Owner and Contractor waive all rights against -1) each other and any of their subcon- tractors, sub subcontractors, agents and employees, each of the other and (2) the Architect, Architect's consultants, separate contractors described in Article 6, if any and any of their sub- contractors, sub subcontractors, agents and employees, for damages caused by fire or other perils to the extent covered by property insurance obtained pursuant to this Paragraph 11.3 or other property insurance applicable to the Work, except such rights as they have to proceeds of such insurance held by the Owner as fiduciary The Owner or Contractor as appropriate, shall require of the Architect, Architect's consultants, separate contractors described in Article 6, if any and the subcontrac tors, sub subcontractors, agents and employees of any of them, by appropriate agreements, written where legally required for validity similar waivers each in favor of other parties enum- erated herein. The policies shall provide such waivers of subro- gation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even though that per son or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly and whether or not the person or entity had an insurable interest in the property damaged. 11.3.8 A loss insured under Owner's property insurance shall be adjusted by the Owner as fiduciary and made payable to the Owner as fiduciary for the insureds, as their interests may appear subject to requirements of any applicable mortgagee clause and of Subparagraph 11.3 10 The Contractor shall pay Subcontractors their just shares of insurance proceeds received by the Contractor and by appropriate agreements, written where legally required for validity shall require Subcontractors to make payments to their Sub subcontractors in similar manner 11.3.9 If required in writing by a party in interest, the Owner as fiduciary shall, upon occurrence of an insured loss, give bond for proper performance of the Owner's duties. The cost of required bonds shall be charged against proceeds received as fiduciary The Owner shall deposit in a separate account pro- ceeds so received, which the Owner shall distribute in accor dance with such agreement as the parties in interest may reach, or in accordance with an arbitration award in which case the procedure shall be as provided in Paragraph 4 5 If after such loss no other special agreement is made, replacement of dam- aged property shall be covered by appropriate Change Order 11.3.10 The Owner as fiduciary shall have power to adjust and settle a loss with insurers unless one of the parties in interest shall object in writing within five days after occurrence of loss to the Owner's exercise of this power• if such objection be made, arbitrators shall be chosen as provided in Paragraph 4 5 The Owner as fiduciary shall, in that case, make settlement with insurers in accordance with directions of such arbitrators. If distribution of insurance proceeds by arbitration is required, the arbitrators will direct such distribution. 11.3.11 Partial occupancy or use in accordance with Paragraph 9 9 shall not commence until the insurance company or com- panies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. The Owner and the Contractor shall take reasonable steps to obtain consent of the insurance company or companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of insurance. 11 4 PERFORMANCE BOND AND PAYMENT BOND 11.4.1 The Owner shall have the right to require the Contrac tor to furnish bonds covering faithful performance of the Con- tract and payment of obligations arising thereunder as stipu- lated in bidding requirements or specifically required in the Contract Documents on the date of execution of the Contract. 11.4.2 Upon the request of any person or entity appearing to be a potential beneficiary of bonds covering payment of obliga- tions arising under the Contract, the Contractor shall promptly furnish a copy of the bonds or shall permit a copy to be made. ARTICLE 12 UNCOVERING AND CORRECTION OF WORK 12.1 UNCOVERING OF WORK 12.1 1 If a portion of the Work is covered contrary to the Architect s request or to requirements specifically expressed in the Contract Documents, it must, if required in writing by the Architect, be uncovered for the Architect s observation and be replaced at the Contractor's expense without change in the Contract Time. 12.1.2 If a portion of the Work has been covered which the Architect has not specifically requested to observe prior to its being covered, the Architect may request to see such Work and it shall be uncovered by the Contractor If such Work is in accordance with the Contract Documents, costs of uncover ing and replacement shall, by appropriate Change. Order be charged to the Owner If such Work is not in accordance with the Contract Documents, the Contractor shall pay such costs unless the condition was caused by the Owner or a separate contractor in which event the Owner shall be responsible for payment of such costs. 12.2 CORRECTION OF WORK 12.2.1 The Contractor shall promptly correct Work rejected by the Architect or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear costs of correcting such rejected Work, including additional testing and inspec tions and compensation for the Architect s services and expenses made necessary thereby 12.2.2 If, within one year after the date of Substantial Comple tion of the Work or designated portion thereof, or after the date AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA° ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 21 for commencement of warranties established under Sub- paragraph 9 9 1 or by terms of an applicable special warranty required by the Contract Documents, any of the Work is found to.be not in accordance with the requirements of the Contract Documents, the Contractor shall correct it promptly after receipt of written notice from the Owner to do so unless the Owner has previously given the Contractor a written accep- tance of such condition. This period of one year shall be extended with respect to portions of Work first performed after Substantial Completion by the period of time between Substan- tial Completion and the actual performance of the Work. This obligation under this Subparagraph 12.2.2 shall survive accep- tance of the Work under the Contract and termination of the Contract. The Owner shall give such notice promptly after dis- covery of the condition. 12.2.3 The Contractor shall remove from the site portions of the Work which are not in accordance with the requirements of the Contract Documents and are neither corrected by the Contractor nor accepted by the Owner 12.2.4 If the Contractor fails to correct nonconforming Work within a reasonable time, the Owner may correct it in accor dance with Paragraph 2 4 If the Contractor does not proceed with correction of such nonconforming Work within a reason- able time fixed by written notice from the Architect, the Owner may remove it and store the salvable materials or equipment at the Contractor's expense. If the Contractor does not pay costs of such removal and storage within ten days after written notice, the Owner may upon ten additional days written notice sell such materials and equipment at auction or at private sale and shall account for the proceeds thereof, after deducting costs and damages that should have been borne by the Con- tractor including compensation for the Architect's services and expenses made necessary thereby If such. proceeds of sale do not cover costs which the Contractor should have borne, the Contract Sum shall be reduced by the deficiency If payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the Owner 12.2.5 The Contractor shall bear the .cost of correcting destroyed or damaged construction, whether completed or partially completed, of the Owner or separate contractors caused by the Contractor's correction or removal of Work which is not in accordance with the requirements-of the Con- tract Documents 12.2.6 Nothing contained in this Paragraph 12.2 shall be con- strued to establish a period. of limitation with respect to other obligations which the Contractor might have under the Con- tract Documents. Establishment of the time period of one yeat as described in Subparagraph 12.2.2 relates' only to the specific obligation of the Contractor to correct the Work, and has no relationship to the time within which the obligation to comply with the Contract Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish the Contractor's liability with respect to the Con- tractor s obligations other than specifically to correct the Work. 12.3 ACCEPTANCE OF NONCONFORMING WORK 12.3.1 If the Owner prefers to accept Work which is not in accordance with the requirements of the Contract Documents, the Owner may do so instead of requiring its removal and cot rection, in which case the Contract Sum will be reduced as appropriate and equitable. Such adjustment shall be effected whether or not final payment has been made. 22 A201 1987 ARTICLE 13 MISCELLANEOUS PROVISIONS 13.1 GOVERNING LAW 13.1 1 The Contract shall be governed by the law of the place where the Project is located. 13.2 SUCCESSORS AND ASSIGNS 13.2.1 The Owner and Contractor respectively bind them- selves, their partners, successors, assigns and legal representa- tives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to covenants, agreements and obligations contained in the Con- tract Documents. Neither party to the Contract shall assign the Contract as a whole without written consent of the other If either party attempts to make such an assignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. 13.3 WRITTEN NOTICE 13.3.1 Written notice shall be deemed to have been duly served if delivered in person to the individual or a member of the firm or entity or to an officer of the corporation for which it was intended, or if delivered at or sent by registered or certified mail to the last business address known to the party giving notice. 13.4 RIGHTS AND REMEDIES 13.4.1 Duties and obligations imposed by the Contract Docu- ments and rights and remedies available thereunder shall be in addition to and not a limitation of duties, obligations, rights and remedies otherwise imposed or available by law 13.4.2 No action or failure to act by the Owner Architect or Contractor shall constitute a waiver of a right or duty afforded them under the Contract, nor shall such :action or failure to act constitute approval of or acquiescence in a breach thereunder except as may be specifically agreed in writing. 13.5 TESTS AND INSPECTIONS 13.5.1 Tests, inspections and approvals of portions of the Work required by the Contract Documents or by laws, ordi- nances, rules, regulations or orders of public authorities having jurisdiction shall be made at an appropriate time. Unless other wise provided, the Contractor shall make arrahgements for such tests, inspections and approvals with an independent test ing laboratory or entity acceptable to the Owner or with the appropriate public authority and shall bear all related costs of tests, inspections and approvals. The Contractor shall give the Architect timely notice of when and where tests and inspec tions are to be made so the Architect may observe such proce dures. The Owner shall bear costs of tests, inspections or approvals which do not become requirements until after bids are received or negotiations concluded. 13.5.2 If the Architect, Owner or public authorities having jurisdiction determine that portions of the Work require addi- tional testing, inspection or approval not included under Sub- paragraph 13 5 1 the Architect will, upon written authorization from the.Owner instruct the Contractor to make arrangements for such additional testing, inspection or approval by an entity acceptable to the Owner and the Contractor shall give timely notice to the Architect of when and where tests and inspections are to be made so the Architect may observe such procedures. AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. The Owner shall bear such costs except as provided in Sub- paragraph 13 5.3 13.5.3 If such procedures for testing, inspection or approval under Subparagraphs 13 5 1 and 13 5.2 reveal failure of the portions of the Work to comply with requirements established by the Contract Documents, the Contractor shall bear all costs made necessary by such failure including those of repeated procedures and compensation for the Architect s services and expenses. 13.5.4 Required certificates of testing, inspection or approval shall, unless otherwise required by the Contract Documents, be secured by the Contractor and promptly delivered to the Architect. 13.5.5 If the Architect is to observe tests, inspections or approvals required by the Contract Documents, the Architect will do so promptly and, where practicable, at the normal place of testing. 13.5.6 Tests or inspections conducted pursuant to the Con- tract Documents shall be made promptly to avoid unreasonable delay in the Work. 13.6 INTEREST 13.6.1 Payments due and unpaid under the Contract Docu- ments shall bear interest from the date payment is due at such rate as the parties may agree upon in writing or in the absence thereof, at the legal rate prevailing from time to time at the place where the Project is located. 13.7 COMMENCEMENT OF STATUTORY LIMITATION PERIOD 13.7 1 As between the Owner and Contractor 1 Before Substantial Completion. As to acts or failures to act occurring prior to the relevant date of Substan- tial Completion, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than such date of Substantial Completion, .2 Between Substantial Completion and Final Certifi- cate for Payment. As to acts or failures to act occur ring subsequent to the relevant date of Substantial Completion and prior to issuance of the final Certifi- cate for Payment, any applicable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of issuance of the final Certificate for Payment, and .3 After Final Certificate for Payment. As to acts or failures to act occurring after the relevant date of issu- ance of the final Certificate for Payment, any appli- cable statute of limitations shall commence to run and any alleged cause of action shall be deemed to have accrued in any and all events not later than the date of any act or failure to act by the Contractor pursuant to any warranty provided under Paragraph 3 5 the date of any correction of the Work or failure to correct the Work by the Contractor under Paragraph 12.2 or the date of actual commission of any other act or failure to perform any duty or obligation by the Contractor or Owner whichever occurs last. ARTICLE 14 TERMINATION OR SUSPENSION OF THE CONTRACT 14.1 TERMINATION BY THE CONTRACTOR 14.1 1 The Contractor may terminate the Contract if the Work is stopped for a period of 30 days through no act or fault of the Contractor or a Subcontractor Sub subcontractor or their agents or employees or any other persons performing portions of the Work under contract with the Contractor for any of the following reasons. 1 issuance of an order of a court or other public author ity having jurisdiction, .2 an act of government, such as a declaration of national emergency making material unavailable; .3 because the Architect has not issued a Certificate for Payment and has not notified the Contractor of the reason for withholding certification as provided in Subparagraph 9 4 1 or because the Owner has not made payment on a Certificate for Payment within the time stated in the Contract Documents, .4 if repeated suspensions, delays or interruptions by the Owner as described in Paragraph 14.3 constitute in the aggregate more than 100 percent of the total num- ber of days scheduled for completion, or 120 days in any 365 -day period, whichever is less; or .5 the Owner has failed to furnish to the Contractor promptly upon the Contractor's request, reasonable evidence as required by Subparagraph 2.2 1 14.1.2 If one of the above reasons exists, the Contractor may upon seven additional days' written notice to the Owner and Architect, terminate the Contract and recover from the Owner payment for Work executed and for proven loss with respect to materials, equipment, tools, and construction equipment and machinery including reasonable overhead, profit and damages. 14.1.3 If the Work is stopped for a period of 60 days through no act or fault of the Contractor or a Subcontractor or their agents or employees or any other persons performing portions of the Work under contract with the Contractor because the Owner has persistently failed to fulfill the Owner s obligations under the Contract Documents with respect to matters impor rant to the progress of the Work, the Contractor may upon seven additional days written notice to the Owner and the Architect, terminate the Contract and recover from the Owner as provided 'in Subparagraph 14 1.2 14.2 TERMINATION BY THE OWNER FOR CAUSE 14.2.1 The Owner may terminate the Contract if the Contractor 1 persistently or repeatedly refuses or fails to supply enough properly skilled workers or proper materials, .2 fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors, .3 persistently disregards laws, ordinances or rules, reg- ulations or orders of a public authority having juris- diction, or .4 otherwise is guilty of substantial breach of a provision of the Contract Documents 14.2.2 When any of the above reasons exist, the Owner upon certification by the Architect that sufficient cause exists to jus- AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION ALA ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. A201 1987 23 tify such action, may without prejudice to any other rights or remedies of the Owner and after giving the Contractor and the Contractor's surety if any seven days' written notice, termi- nate employment of the Contractor and may subject to any prior rights of the surety 1 take possession of the site and of all materials, equip- ment, tools, and construction equipment and machin- ery thereon owned by the Contractor. .2 accept assignment of subcontracts pursuant to Para- graph 5 4, and .3 finish the Work by whatever reasonable method the Owner may deem expedient. 14.2.3 When the Owner terminates the Contract for one of the reasons stated in Subparagraph 14.2 1 the Contractor shall not be entitled to receive further payment until the Work is finished. 14.2.4 If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for the Archi- tect's services and expenses made necessary thereby such excess shall be paid to the Contractor If such costs exceed the unpaid balance, the Contractor shall pay the difference to the 24 A201 1987 Owner The amount to be paid to the Contractor or Owner as the case may be, shall be certified by the Architect, upon appli- cation, and this obligation for payment shall survive termina- tion of the Contract. 14.3 SUSPENSION BY THE OWNER FOR CONVENIENCE 14.3.1 The Owner may without cause, order the Contractor in writing to suspend, delay or interrupt the Work in whole or in part for such period of time as the Owner may determine. 14.3.2 An adjustment shall be made for increases in the cost of performance of the Contract, including profit on the increased cost of performance, caused by suspension, delay or interrup- tion. No adjustment shall be made to the extent. 1 that performance is, was or would have been so sus- pended, delayed or interrupted by another cause for which the Contractor is responsible; or .2 that an equitable adjustment is made or denied under another provision of this Contract. 14.3.3 Adjustments made in the cost of performance may have a mutually agreed fixed or percentage fee. AIA DOCUMENT A201 GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION FOURTEENTH EDITION AIA® ©1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. Article 7• Changes in the Work This article has undergone substantial revision, and provides for a new type of document. The Change Order is now required to be signed by the Owner, Contractor and Architect. In the event the Contractor's agreement cannot be obtained, a new document, a Construction Change Directive which is signed by the Owner and Architect, shall be issued. Both of these situa- tions were previously covered by Change Orders. Now they are separated so that they can, if necessary, be handled independently A diagram of the process may be found on the last page of this Instruction Sheet. Article 9: Payments and Completion Substantial Completion The Substantial Completion provisions now explicitly allow for partial occupancy or use. A Certifi- cate of Substantial Completion covering a portion of Work is provided for, and consent of the insurer of the property is required. Article 10• Protection of Persons and Property Asbestos, PCB and Other Hazardous Wastes The problem of hazardous wastes is addressed, for the first time, in a paragraph prescribing procedures to be followed in the event such substances are encountered on the site. Under its provisions, the Work may only proceed in the affected area by written consent of the Owner and Contractor, or in accordance with a deter mination of the Architect upon which arbitration has not been demanded. Article 11 Insurance and Bonds This article has been expanded to cover bonds as well, and it is now provided that bonding requirements must be made known to the Contractor in the bidding requirements or at the time the Contract is signed. The Contractor, in turn, is required to furnish copies of the bonds on request to any person appearing to be a beneficiary of them. Owner's property insurance is now required to be written in the full amount of the Contract Sum and adjusted for changes in the Contract Sum effected by Change Order. The coverages to be included on the all -risk policy form are given in much greater detail because all -risk merely means coverage of all risks not specifically excluded. In addition, the Owner is now required to insure materials stored off -site or in transit. Article 12: Uncovering and Correction of Work Correction of Work The correction period has been extended with respect to Work performed after Substantial Comple tion so that such Work is also covered by a one year correction period. Article 13. Miscellaneous Provisions Statutory Limitation Period separate paragraph has been included under Miscellaneous Provisions giving the dates of commencement of the statutory limitation period with respect to acts or failures to act occurring at different points in the Project. This paragraph covers a range of situations and sets three commencement dates one for occurrences before Substan- tial Completion, another for those taking place between Substantial Completion and issuance of the final Certificate for Pay ment, and a third for those taking place after the final Certificate has been issued. Article 14 Termination or Suspension of the Contract Procedures are set out for suspension of the Contract by the Owner for reasons other than the fault of the Contractor. A provi- sion allowing for termination in like circumstances has been included in AIA Document A511, Guide for Supplementary Conditions. Further details on these changes may be found in the Architect's Handbook of Professional Practice when revised. A side -by side comparison of the 1976 and 1987 editions of A201 will be available for a limited time after publication of the 1987 edition C. USING THE A201 FORM Modifications Users are encouraged to consult an attorney before using an AIA document. Particularly with respect to licensing laws, duties imposed by building codes, interest charges, arbitration and indemnification, this document may require modification with the assistance of legal counsel to fully comply with state or local laws regulating these matters. Generally necessary modifications to the General Conditions may be accomplished by Supplementary Conditions included in the Project Manual and referenced in the Owner Contractor Agreement. See AIA Document A511 Guide for Supplementary Con- ditions, for model provisions and suggested format for the Supplementary Conditions. Because A201 is designed for general usage, it does not provide all the information and legal requirements needed for a specific Project and location Necessary additional requirements must be provided in the other Contract Documents, such as the Sup- plementary Conditions. Consult AIA Document A521 Uniform Location of Subject Matter, to determine the proper location for such additional stipulations. It is definitely not recommended practice to retype the standard document. Besides being a violation of copyright, retyping can introduce typographical errors and cloud the legal interpretation given to a standard clause when blended with modifica- tions. Retyping eliminates one of the principal advantages of standard form documents. By merely reviewing the modifications to be made to a standard form document, parties familiar with that document can quickly understand the essence of the proposed relationship. Commercial exchanges are greatly simplified and expedited, good -faith dealing is encouraged, and otherwise latent clauses are exposed for scrutiny In this way contracting parties can more confidently and fairly measure their risks. INSTRUCTION SHEET FOR AIA DOCUMENT A201 1987 EDITION AJA® THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W WASHINGTON, D.C. 20006 3 D. CHANGE ORDERS AND CLAIMS 4 The diagrams below are graphic examples of the Change Order and Claims processes under the 1987 edition of AIA Document A201 These diagrams are presented for instructional purposes only, and are not intended to augment or supersede any contract language contained in the document. Users are urged to read the document in its entirety and to consult the relevant contract language regard- ing the particulars of the processes diagrammed below A Change Order may he initiated by the Owner, Contractor or Architect Typically upon initiation of the Change Order process, the Architect prepares a copy of AIA Document G709 Proposal Request, and submits it to the Contractor for pricing. This is then con- veyed hack through the Architect to the Owner, beginning the process diagrammed below CHANGE ORDER PROCESS Architect Owner Contractor With full Contractor Proposal Pro Owner sends Po prepares Architect accepted and signs signs Change agrees and agreement on submi 1 appli- ts certifies by Owner Change Change v' Order signs C.O. price /time cation for payment Order Order to or C.C.D. 71 payment Contractor 3701 ARCHITECT 7.2.1 7.2.1' 7.2.1 Without Q G71 2/703 4.2.8 VES Without YES Architect iPROCESSES PAPERWORK ment on Architect PAYMENTS ontractor Owner docu- price /time Bills Owner Change PROVISIONS transmits pa proposal rtilly accepts ments 7. 3.4 se and Order IN ART. 9 agrees a A rc nt h itect to prepared with with partial amount 7'. for Contractor and commen a reement not in agree lotions C.C.D. 9 dispute evaluation signed 7.3.7 7.3.6 7.3.5 7.3.9 w Owner or Proposal Architect Architect a Contractor Contractor Becomes must rejected prepares Owner sends NO refuses r o both a be filed by v and signs CsiCgns C.C.D. to to sign disagree a V claim within Owner C.C.D. C.C.D. Contractor C.C.D. second time 21 days G714 7.3.1 7.3.1 7.3.8 ;.3.8 4.3.1 rl 4.3.3 7.3.1 7.3.4 7.3.2 CONTRACTOR CLAIMS 4.2.8 PROCESS UNDER ART. 4 Dropped The Claims process may be started through a variety of circumstances, including failure to agree upon the terms of a Change Order as shown in the diagram above. Once the Claim arises, the Owner and Contractor, together with the Architect, seek resolution of the dispute by following specific steps established in the Contract Documents and particularly in A201 These steps are generalized in the diagram below CLAIMS PROCESS U Ev nt occurs, Is first recognized, giving to Claim 4.3.3 21 days 10 days k 10 days ma imum ma imum 7 ma imum Claim made by writle oti 4.3.3, 4.3.6 6 4.3.9 Fi al payment wa Claims of already made preserved Architect take of fly prelims ary cti 4.4.1 13.7 4.3.2 DISAGREES 4.3.5 Claimant responds 4.4.3 11 cti follows withi 30 days minimum If ctlo follows within 45 days minimum 4.3.2 If mechanic lie is filed, may proceed immediately to arbitrati Statute of Ilmitatio s— maximum time limit No definite time limit 11 de sit, withi 10 days —on mum 4.3.2 Architect otille 7 days Architect' partie final that ii al ma imum decisio de forthcoming 4.4.4 4.5.4 30 days ma imum Arbitration a 0 o q 0 i'L J INSTRUCTION SHEET FOR AIA DOCUMENT A201 1987 EDITION AIA© THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N W WASHINGTON, D C. 20006 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 2 SUPPLEMENTARY CONDITIONS OF THE CONTRACT SECTION 00700 PAGE 1 GENERAL CONDITIONS SUPPLEMENTARY CONDITIONS OF THE CONTRACT The following supplements modify change, delete from or add to the "General Conditions of the Contract for Construction, AIA Document A201, 14th Edition, 1987 Where any Article of the General Conditions is modified or deleted by these supplements, the unaltered portion of that Article, Paragraph, Subparagraph or use shall remain in effect. ARTICLE 1. CONTRACT DOCUMENTS 1.1 BASIC DEFINITIONS Add the following numbers, titles and paragraphs: 1 1.5 Miscellaneous Definitions 1 1.5 1 The `Standard Form of Agreement between Owner and Contractor" AIA Document A101, 1987 Edition shall be used as the form of agreement for this Project. All articles in the form shall be subject to the bidding requirements and contract documents. 1 1.5.2 The term `Project Manual' as used in these Supplementary conditions is the volume which includes the Instructions to Bidders, sample forms, and certain of the Contract Documents such as the Conditions of the Contract, and the Technical Specifications. 1 1.5.3 The technical specifications are included in this Project Manual as Divisions 1 through 16. 1 1.5 4 The term `product' as used in these Supplementary Conditions includes materials, systems, equipment and accessories. ARTICLE 2: OWNER 2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER Delete Paragraph 2.2.5 in its entirety and add the following: 2.2.5 The Contractor will be furnished fifteen (15) copies of Drawings and Project Manuals free of charge. These copies may consist of Drawings and Project Manuals returned through the bidding process. It is the Contractor's responsibility to assure the completeness of these copies. ARTICLE 3: CONTRACTOR 3.4 LABOR AND MATERIAL Add the following paragraphs: 3 4.3 Not later than twenty (20) days from the Contract Date, the Contractor shall provide a list showing the name of Subcontractors and Principal Suppliers and Fabricators. No substitutions of subcontractors and principal suppliers and fabricators will be allowed without prior approval by the Architect. 3 4 4 The Architect will promptly reply in writing to the Contractor stating whether the Owner or the Architect, after due investigation, has reasonable objection to any such substitution. Failure MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.7 PERMITS, FEE AND NOTICES ARTICLE 4: ADMINISTRATION OF THE CONTRACT 4.5 ARBITRATION ARTICLE 7: CHANGES IN THE WORK 7.3 CONSTRUCTION CHANGE DIRECTIVES SECTION 00700 PAGE 2 GENERAL CONDITIONS SUPPLEMENTARY CONDITIONS OF THE CONTRACT to object to above shall not constitute a waiver of any of the requirements of the Contract Documents. Delete Paragraph 3 7 1 in its entirety and add the following: 3 7 1 The Owner shall be responsible for bearing the cost of the building permit and any renewal charges for same. The Architect shall be the `single point' of contact between the Building Department and the project. The Contractor will be notified by the Architect that the building permit is available. The Contractor shall secure and pay for other permits and governmental fees, licenses, and inspections necessary for proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required when bids are received or negotiations concluded. 4.5 1 Delete the first sentence and replace with the following: `Except as may be otherwise provided in this agreement, all claims, counterclaims, disputes and other matters in question between the Owner and the Contractor arising out of or relating to this agreement, or the branch thereof, will be decided by arbitration, if the parties hereto mutually agree, otherwise, in a court of competent jurisdiction within the county in which the Owner is located. In the event the parties agree to arbitrate any matters, said arbitration shall be in compliance with the terms of Paragraph 4.5 of the AIA Document A201 General Conditions of the Contract for Construction. Delete paragraph 4.3 4 in its entirety and add the following: 4.3 4 Unless otherwise agreed to in writing, the Contractor shall diligently carry on the Work and maintain its progress during any arbitration or court proceedings in accordance with the Architect's directions, and the Owner shall continue to make payments to the Contractor in accordance with the Contract Documents. 7.3 6 In the first sentence, delete the words `a reasonable allowance for overhead and profit' and add `an allowance for overhead and profit in accordance with the schedule set forth in Paragraph 7.3 10 below" Add the following Paragraph. 7.3 10 In Paragraphs 7.3.3 and 7.3.6 the allowance for overhead and profit combined, included in the total cost to the Owner shall be based on the following schedule: 1 For the Contractor, for any Work performed by the Contractor's own forces, fifteen (15) percent of the cost. 2. For the Contractor for Work performed by his Subcontractor, ten (10) percent of the amount due the Subcontractor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3 For each Subcontractor or Sub subcontractor involved, for any Work performed by that Contractor's own forces, fifteen (15) percent of the cost. 4 For each Subcontractor, for Work performed by his Sub subcontractors, ten (10) percent of the amount due the Sub subcontractor 5 Cost to which overhead and profit is to be applied shall be determined in accordance with Paragraph 7.3.6 6. hi order to facilitate checking of quotations for extras or credits, all proposals, except those so minor that their propriety can be seen by inspection, shall be accompanied by a compete itemization of costs including labor, materials, and Subcontracts. Labor and materials shall be itemized in the manner prescribed above. Where major cost items are Subcontracts, they shall also be itemized. In no case will change involving over $100 00 be approved without such itemization. ARTICLE 9: PAYMENT AND COMPLETION. See General Requirements Section 01026 for expansion of this article. ARTICLE 11. INSURANCE AND BONDS SECTION 00700 PAGE 3 GENERAL CONDITIONS SUPPLEMENTARY CONDITIONS OF THE CONTRACT 11.1 1 In the first line of subparagraphs 11.1.1 following the word `maintain' insert the words `in a company or companies licensed to do business in the State of Washington. Add to end of subparagraph 11.1.1 `Owner's and Contractor's protective coverage shall include the following as additional named insured. Clallam County Public Hospital District No. 2 (owner Olympic Memorial Hospital, Port Angeles, Washington), the Board of Commissioners thereof, and the officers and employees thereof in their official capacities. Add the following subparagraphs: 11 1 1.8 Liability insurance shall include all major divisions of coverage and be on a comprehensive basis including: 1 Premises Operations (including X -C -U). 2. Independent contractor's protective. 3 Products and completed operations. 4 Contractual including specified provision for the Contractor's obligations under Paragraph 3 18. 5 Owner, non -owned and hired motor vehicles. 6 Broad form coverage for property damage. 7 Workmen s Compensation Statutory 8. Employer's liability Same limits as compensation liability on Stop Gap. 9 Comprehensive general liability a. Bodily injury $1, 250,000 each person/$1,500,000 each occurrence b. Personal injury $1,250,000 each person $1,250,000 aggregate $1,500,000 general aggregate. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 11.1.3 Add the following paragraph. SECTION 00700 PAGE 4 GENERAL CONDITIONS SUPPLEMENTARY CONDITIONS OF THE CONTRACT c. Property damage $1,100,000 each person $1,100,000 each occurrence/$ 1,100,000 aggregate. 10 Automobile liability a. Bodily injury $1, 250,000 each person/$1,500,000 each occurrence. 11 Independent contractors same limits as above. 12. Products and completed operations same limits as above until full acceptance of new construction by Owner Additionally named insured. Clallam County Public Hospital District No. 2, State of Washington; the Board of Commissioners and Administrative Officers in their capacities, known as Olympic Memorial Hospital, Port Angeles, Washington. Certificate of insurance to be supplied to Owner 13 Contractual liability same limits as above. 14 Broad Form Builders Risk policy covering materials, supplies, machinery equipment, fixtures, temporary structures to be used in or incidental to the construction, fabrication, installation, erection or completion, including accrued labor charges. All Risk form with normal Exclusions. All Sub or Independent Contractors should provide Certificates of Insurance to Contractor commensurate with the liability limits set forth in 7 8, 9 and 10 Amount: In the sum of the total completed value. `Furnish one copy of Certificates herein required for each copy of the Agreement; specifically set forth evidence of all coverage required by Paragraphs 11 1.1 and 11 1.2. The form of the Certificate shall be AIA Document G705 Furnish to the Owner copies of any endorsements that are subsequently issued amending coverage or limits. 11.3 PROPERTY INSURANCE: ALL RISK (SEE ALSO 11.1.8 (14) ABOVE) Delete Paragraph 11.3 1 in its entirety and add the following: 11.3 1 The Contractor shall purchase and maintain property insurance upon the entire work at the site to the full insurable value thereof. Such insurance shall be in a company or companies against which the Owner, the Contractor, the Subcontractors and Sub subcontractors in the Work and shall insure against the perils of fire and extended coverage and shall include "all risk' insurance for physical loss or damage including, without duplication of coverage, theft, vandalism and malicious mischief. 11.3 1.1 If this insurance is written with stipulated amounts deductible under the terms of the policy the Contractor shall pay the difference attributable to deductions in any payments made by the insurance carrier on claims paid by this insurance. Delete Paragraph 11.3 6 in its entirety and add the following: 11.3.6 The Contractor shall file the original and one certified copy of all policies with the Owner and Architect before exposure to loss may occur If the Owner is damaged by the failure of the Contractor to maintain such insurance and to so notify the Owner, then the Contractor shall bear all reasonable costs properly attributable thereto. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 11.3 7 Add the following sentence: `In waiving rights of recovery under terms of this paragraph, the term `Owner" shall be deemed to include his employees, and the Architect and his employees as the Owner's representative, as provided in the Contract Documents. Delete Paragraph 11.3 11 in its entirety and add the following: 11.3 11 If the Owner finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion, such occupancy shall not commence prior to a time mutually agreed to by the Owner and Contractor and concurred with by the insurance company or companies. This insurance shall not be canceled or lapsed on account of such partial occupancy ARTICLE 13: MISCELLANEOUS PROVISIONS 13.1 GOVERNING LAW Delete Paragraph 13 1 1 in its entirety and add the following: 13 1.1 The Contractor shall at all times comply with federal and state laws, local laws and ordinance, and any regulations which in any manner affect the performance of the contract. Add the following numbers, titles and paragraphs: 13.8 PREVAILING WAGE ACT SECTION 00700 PAGE 5 GENERAL CONDITIONS SUPPLEMENTARY CONDITIONS OF THE CONTRACT 13 8.1 State of Washington Prevailing Wage Act, Chapter 39 12 RCW applies to the entire project. The contractor any subcontractor, or other person doing work or any part of it shall not pay any workmen, laborers, or mechanics less than the hourly minimum rate of wage defined by RCW 39 12.010 as established by the Department of Labor and Industries which is the prevailing rate of wage. Prevailing Wage Rates are included in the Contract Documents as though bound herein. 13 8.2 The Contractor shall obtain the minimum hourly wage rate for each trade or occupation from the Department of Labor and Industries. 13.8.3 The Contractor and all Subcontractors shall submit a `Statement of Intent to Pay Prevailing Wage' prior to receiving the first payment, and following final acceptance, shall submit Affidavits of Wages Paid' that have been certified by the industrial statistician of the Department of Labor and Industries. 13.9 THE CONTRACTOR SHALL MAINTAIN POLICIES OF EMPLOYMENT AS FOLLOWS: 13 9 1 The Contractor and all Subcontractors shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, age, marital status, creed, or national origin and the presence of any sensory mental or physical handicap, and to authorize selections or decisions to be made upon such classifications if they are based on a bona fide occupational qualification. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, religion, color sex or national origin. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the policies of nondiscrimination. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 00700 PAGE 6 GENERAL CONDITIONS SUPPLEMENTARY CONDITIONS OF THE CONTRACT 13.9.2 The Contractor and all Subcontractors shall, in all solicitations or advertisement for employees placed by them or on their behalf, state that all qualified applicants will receive consideration for employment without regard to race, religion, color, sex, or national origin. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS' A. Drawings and general provisions of Contract, including General and Supplementary Conditions apply to work of this section. Coordinate related requirements, specified in other Division 1 sections including but not limited to the following: B. Section 01500 Temporary Facilities C. Section 01010 Summary of Work, Alternates D Section 01205 Procedures and Controls 1.2 DESCRIPTION OF REQUIREMENTS A. A list of minimum special conditions existing as a part of this project include but are not necessarily limited to the following categories: 1.3 Permits 1.4 Fire Safety 1.5 Owner Occupancy 1.6 Protection of Existing Utilities 17 Continuity of Utility Services 1.8 Work During Other Than Normal Working Hours 1.9 Waste Material 1 10 Control of Solvents 1.11 Final Acceptance 1.3 PERMITS SECTION 00700 PAGE 1 GENERAL CONDITIONS SPECIAL CONDITIONS OF THE CONTRACT A. The permits required for execution of this contract, as referenced in General Conditions, Article 10, and amendments thereto, may include but are not necessarily limited to the following: B. City of Port Angeles Building Permit C. City of Port Angeles Electrical Permit D City of Port Angeles Mechanical Permit E. City of Port Angeles Plumbing Permit F City of Port Angeles Fire Department permits for flammable liquid storage and use, and welding and cutting. G. Washington State Department of Health/Department of Labor Industry Permit. H. Equipment Standards: All equipment furnished and/or installed under this contract shall meet the safety requirements of all applicable codes. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.4 FIRE SAFETY A. The Contractor shall conduct operations in a manner that is fire -safe for the work area and adjacent areas. Proper fire extinguishers shall be provided, identified, and maintained. Refer to Section 01500. The premise shall be maintained clear of rubbish, debris, or other material constituting a potential fire hazard. A proper fire separation shall be maintained between work area and any adjacent areas. All exit pathways shall be maintained. The City of Port Angeles Fire Code is incorporated herein by reference, and the Contractor shall adhere to all applicable provisions as determined by the Port Angeles Fire Department. B. Where significant or continued noncompliance with fire safety is noted, the Owner reserves the right to stop the work at no extra cost or extension of time pending remedial action. Furthermore, the Contractor shall be responsible for, and reimburse the Owner as appropriate, any fines or penalties levied by the Port Angeles Fire Department. C. Prior to a shutdown or temporary termination of all or part of the existing fire sprinkler system, the Contractor shall notify the Owner and Architect in writing 10 days prior and verbal notification 48 hours in advance. The Contractor shall also provide for manned fire watch of the entire affected area for the duration of the shutdown, even as it includes areas outside the scope of work area. The specific schedule and provisions of the shutdown and fire watch shall be submitted to and approved by the Owner and shall adhere to State and city requirements. 1.5 OWNER OCCUPANCY SECTION 00700 PAGE 2 GENERAL CONDITIONS SPECIAL CONDITIONS OF THE CONTRACT A. The Owner will occupy the site and existing building during the entire construction period. The Owner reserves the right to occupy all or portions of the newly completed areas of the building provided that such occupancy does not interfere with completion of the work. Refer to Section 01010 Summary of Work. 1.6 PROTECTION OF EXISTING UTILITIES A. Concealed utility of record are shown on the drawings. These are not necessarily exact with respect to location or completeness; therefore, the Contractor shall take the following steps: 1. Notify the Owner in writing, on each occasion, of the intent to work near existing underground utility services or structures. Submit procedure for approval to assure safe and continuous operation of the services. 2. Proceed with sufficient caution to preclude damaging any utilities known or unknown. In the event unidentified utilities are encountered, notify Owner immediately for direction. 3 In the event utilities are damaged during construction by general contractor or his subcontractor, temporary services and/or repairs must be made immediately to maintain continuity of services at the Contractor's expense. 1.7 CONTINUITY OF UTILITY SERVICES A. Continuity of utility services to and within the building shall be reasonably maintained at all times. Utility systems shutdowns required to facilitate construction work shall be accomplished in accordance with the following requirements: B. The Contractor shall submit a schedule of utility shutdowns within thirty days after the Notice to Proceed. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 00700 PAGE 3 GENERAL CONDITIONS SPECIAL CONDITIONS OF THE CONTRACT C. The Contractor shall confirm all requests for utility shutdowns in writing to the Owner not less than ten (10) days prior to the proposed date. Verbal notification shall be given 48 hours prior to Owner's representative and Architect. Requests shall include as a minimum the following information. 1 Utility services affected. 2. Reason shutdown is required. 3 Work to be accomplished during the shutdown. 4 Proposed shutdown date and time. 5 Duration of the shutdown. 6 List person on site responsible for shutdown during its duration, i.e. mechanical subcontractors and/or electrical subcontractors on site man-in- charge. C. The actual time and date of all shutdowns will be subject to approval by the Owner In general, they will be scheduled for nights, weekends, holidays or other low intensity use periods. D The duration of all shutdowns shall be held to a reasonable minimum as determined by the Owner in cooperation with the general contractor and trade being affected. E. Materials and equipment required for the work to be accomplished during shutdown shall be complete and available on the job for review by the Owner prior to the shutdown. If the Contractor is not adequately prepared, the shutdown will be canceled and rescheduled by the Contractor F The Owner's personnel shall be involved in all shutdown and restarting of utilities. They will inspect the installation prior to restarting and will not restart if any unsafe condition exists. In the event the Contractor's work is not complete during the time scheduled for the shutdown, the Owner may elect to restart the utilities' service. In that event, additional shutdown requirements shall be rescheduled in accordance with the preceding requirements. Restarting shall not be construed as acceptance of the work as complete. G. The Contractor shall include in the bid all costs associated with utilities' shutdowns. The Owner will make no extra payment for overtime work, schedule changes or failure to complete utility connections within authorized shutdown periods. 1.8 WORK DURING OTHER THAN NORMAL WORKING HOURS A. When work during other than normal working hours is to be accomplished, the Owner must be advised so that the Owner's Security may be properly notified. Any construction activity between the hours of 6 p.m. to 6 a.m. is subject to approval of the Owner 1.9 WASTE MATERIAL A. All refuse and waste material, including excess earth from excavation, shall be disposed of by the Contractor off the Owner's property Waste material shall not be stockpiled on the Owner's property Immediately clean up any spilled material from buildings, roads, etc. 1.10 CONTROL OF SOLVENTS A. The use of solvents shall be subject to the approval of the Owner. A written procedure for the control of emissions shall be submitted prior to any use. Areas where solvents are to be used MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS must be isolated and vented to the outside (away from air intakes, pedestrian traffic or patient room windows). 1.11 FINAL ACCEPTANCE A. Final acceptance of the project shall be by action of the Board of Commissioners after substantial completion of the project. 0 1997 Mahlum Nordfcas McKinley Gordon SECTION 00700 PAGE 4 GENERAL CONDITIONS SPECIAL CONDITIONS OF THE CONTRACT END OF SECTION 00700 t 1 1 r 1 1 t 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 ADDENDA TO BE ISSUE!) A. Addenda may be issued by the Architect prior to the bid opening. B. All addenda will be considered a part of the contract documents. C. Please add addenda to the contract documents and make notations on this page as indicated below Addendum PART 2 ADDENDA FORMAT Addenda will be issued in the following format: MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS No. of Pages Date Received From the Office of: MAHLUM NORDFORS MCKINLEY GORDON 2505 Third Avenue, Suite 219 Seattle, WA 98121 Date: NOTICE TO ALL CONTRACTORS. SUBCONTRACTORS. AND SUPPLIERS This addendum is considered a part of the contract documents. Section Description 0 1997 Mahlon Nordfors McKinley Gordon SECTION 00900 PAGE 1 ADDENDA SECTION 00901 PAGE 1 ADDENDUM 1 END OF SECTION 00900 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. Project Identification and Location. Refer to Section 00002, Introduction. SECTION 01010 PAGE 1 SUMMARY OF WORK B. Form of Contract: The work shall be performed under a single General Contract, including civil, mechanical and electrical work, as specified in Divisions 0 and 1 through 16 and as shown on drawings in Division A, C, M and E. C. Governing Regulations: The work shall be performed in accordance with applicable codes, ordinances and regulations. 1.4 WORK SUMMARY A. Demolition and remodel of approximately 12,000 SF at the first floor Surgery Center to renovate existing operating rooms and support facilities, enlarge the Recovery area, and add a sixth operating room. B Demolition and remodel of approximately 12,000 SF at the second floor nursing units to renovate patient care rooms and provide better support facilities. C. An addition to the north side of the hospital comprising approximately 1 700 SF of new storage /office space at the basement level, approximately 1 700 SF of new Surgery locker rooms, lounge, and education space at the first floor level, and approximately 2,200 SF of new patient rooms and corridor at the second floor level. D Demolition and remodel of approximately 1,700 SF at the first floor Short Stay wing to expand the waiting area and add a an admissions office and renovate patient care rooms. E. An approximately 2,500 SF addition to the east side of the first floor Short Stay wing to add patient rooms and a new minor procedure operating room. F Miscellaneous room reconfigurations and remodels within or near the area of work to renovate or improve services or provide access to the area of work. G. Generally the work includes: 1 Interior demolition of existing walls, ceilings and floor finishes, sawcutting new openings in concrete slabs and walls. Temporary removal, storage, protection, and reinstallation of building components on floors below as required to perform work. 2. Construction of walls, ceilings, doors, and related components, including floor, ceiling, and wall finishes. 3 Mechanical and electrical systems and equipment and connections and extensions to existing utilities including fire sprinkler and fire alarm systems. Repair of roofing at all penetrations and curbs. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01010 PAGE 2 SUMMARY OF WORK 4 Protection of existing facilities, finishes, and equipment. Construction barriers to protect adjacent occupied areas. Patching and repair of all existing facilities, finishes, or utilities damaged as a result of the work. 5 Installation of Owner furnished items and preparations for items furnished and installed by the Owner 6. a New exterior walls and window systems and roofing at additions. 7 Maintaining the project site in an orderly manner, maintaining all construction materials and refuse within the area of work, and daily cleaning areas adjacent to the area of work from all refuse caused as a result of the work. 8. Seismic bracing for mechanical and electrical system components per Section 01064 Seismic Anchorage Requirements. 9 Cooperation and coordination with Owner's Representative and other Contractors on site to maintain Owner's operation and ensure the timely progress of all work. H. Items Furnished and Installed by Owner 1 Concurrently with work of this Project, the Owner will separately purchase certain movable and fixed equipment and miscellaneous items which will be installed during the course of Construction. Such items may not be indicated in the Documents, or they may be indicated as "By Others" or "MC" items, meaning "Not in Contract." Contractor shall cooperate with the Owner and his Suppliers. 2. Items furnished and installed by Owner are noted "FIO" Items Furnished by Owner Installed by Contractor 1 Items furnished by Owner and installed by Contractor are noted "FOIC." 2. Contractor shall be responsible for required coordination of all trades, to include required scheduling of equipment with Owner for delivery and protection of equipment as required. 3 Refer to drawings and specifications for preparatory work, to be accomplished by Contractor 4 Contractor shall be responsible to verify service requirements for proper installation of items, per approved shop drawings. 5 FOIC items will be delivered to the job site loading dock for consignment to the Contractor 6 The Contractor shall assume custody and responsibility for the items upon uncrating and determining that the contents are complete and in satisfactory condition for installation. 7 The installation of the items includes the following: a. Uncrating and delivery to installation locations in the Project. b. Setting in place, building -in, leveling and attaching to other work as required. c. Making any required electrical or mechanical connections. d. Leaving items completely installed and in operable condition satisfactory to the Architect. J Salvage 1 Items Marked "Owner Salvage" Contractor to move to storage where directed by Owner MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01010 PAGE 3 SUMMARY OF WORK 2. Items Marked "For Re-Use" Contractor to incorporate in the Work and modify and refinish as may be required, or provide new at Contractor's option. 3 Other All items unless otherwise noted such as clocks, casework, coat hook racks, doors, etc. which are necessary to remove due to interference with new work, remain the property of the Owner, and are to be salvaged for the Owner a. All other work becomes Contractor's property and may be reused on the work provided Architect judges it equal to new materials specified. b. Remove all other items from site at Contractor's expense. K. Mock -ups 1. Patient Headwall Mock -ups: After walls are framed in, but prior to roughing in electrical and plumbing, mock up locations of electrical receptacles, phone and data outlets, nurse call and code blue devices, wall mounted lights, vacuum, oxygen, and medical air outlets. Use full size labeled cards or colored paper to differentiate different devices. Obtain patient bed or gurney from Owner and place in appropriate location. a. Allow sufficient time to review mock -up with Architect and Owner's departmental representative. Make minor adjustments as directed before proceeding with rough in. b. Provide mock -ups at the following locations: (1) Surgery Recovery Room Provide mock -ups at two adjacent gurney locations to show relationship of nurse workspace to two patients. (2) Surgery Pre-Op Holding Area Provide mock -up at one of the two Pre-Op Holding rooms. 2 Main Patient Wing Provide mock -ups of headwalls at two typical back to back south side patient room and mock -ups of headwalls at two typical back to back north side patient rooms. 2. Operating Room Mock ups: After walls are opened up or framed in, but prior to roughing in electrical and plumbing, mock up locations of electrical receptacles, phone and data outlets, nurse call and code blue devices, X -Ray viewboxes, vacuum, oxygen, nitrogen, and medical air outlets. Use full size labeled cards or colored paper to differentiate different devices. a. Allow sufficient time to review mock -up with Architect and Owner's departmental representative. Make minor adjustments as directed before proceeding with rough in. (3) b. Provide mock ups each Operating Room, Numbers 1 through 7 1.5 CONTRACTOR'S USE OF PREMISES A. General 1 Comply with requirements of Section 01500 Construction Facilities and Temporary Controls. 2. Use of premises will be permitted provided Owner's normal, safe use of building, roads and walks is not negatively affected in Owner's judgment. 3 Any damage to building or site shall be restored to condition on day of bid opening at Contractor's expense, including grass, paving, curbs etc. 4 Provide construction site barrier to prevent unauthorized entry into construction areas and as directed by authorities having jurisdiction. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS B. Access to Work 1 Existing roadways and walks adjoining the building may be used, subject to approval of planned use prior to starting work. 2. Work area and parking shall be per Section 01500 Construction Facilities and Temporary Controls. 1.6 ALTERATIONS TO EXISTING WORK A. Existing finishes and materials shall be altered as shown or as required for a complete installation. In the event of damage, the work includes restoring existing finishes and materials to their condition immediately prior to the award of contract. 1.7 OCCUPANCY BY OWNER A. During the Contractor's performance of the Work, tenants will continue to occupy the buildings and spaces in the immediate vicinity during its normal hours. Protect safety of building occupants at all times. B. Interruption of building access and operation will not be permitted. Limit construction operation and methods to those that will not unduly affect the working environment of the occupied spaces, including noise, dust, odors, hazards and other undesirable effects and conditions. Special caution is emphasized because tenants will be occupying this facility during the construction. 1.8 VERIFICATION OF EXISTING CONDITIONS A. Project Drawings: Contract Document Drawings do not necessarily represent complete or exact existing conditions of the Project. B Examination of Existing Building and Site 1 Bidders and Contractors shall examine existing sites and buildings as required prior to bidding to determine any conditions affecting the Work. Refer and read in detail all aspects of the existing as built drawings. 2. Contact Owner for arrangements. C. Examination of Original Drawings 1 Some Original Drawings and other record drawings are available. 2. Contact Architect or Owner for arrangements. PART 2 PRODUCTS Not used. PART 3 EXECUTION Not used. 0 1997 Mahhun Nordfors McKinley Gordon SECTION 01010 PAGE 4 SUMMARY OF WORK END OF SECTION 01010 MAHLUM NORDFORS McKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. Requirements Specified in This Section 1 Contract time and liquidated damages 2. Contract administration sequence 3 Work sequence requirements B. Related Requirements Specified Elsewhere 1 Section 00520, Notice to Proceed 2. Section 00700, General Conditions 3 Section 01026, Payment Procedures 4 Section 01300 Submittals 5 Section 01500 Construction Facilities and Temporary Controls 6 Section 01630 Product Options and Substitutions 7 Section 01700, Project Closeout PART 2 CONTRACT TIME AND LIOUIDATED DAMAGES 2.1 CONTRACT TIME ALLOTTED 2.2 SUBSTANTIAL COMPLETION AND COMPLETION SECTION 01011 PAGE 1 CONTRACT TIME AND SEQUENCE A. The work shall be substantially completed within four hundred seventy-five (475) calendar days of the date of the Notice to Proceed. B Contract Time may be changed only by Section 01036, Change Order Procedures. C. Provide overtime as required to complete the work within the contract time allotted without additional cost to Owner A. Time is of the essence of each and every portion of this Contract: the Contractor shall prosecute the Work regularly diligently and uninterrupted at such rate of progress as will ensure completion thereof within the time specified. Proceed per Section 00510 Notice to Proceed. B. The Owner intends to occupy each Phase of Work completed the day after the Date of Substantial Completion for that Phase in accordance with the Certificate of Substantial Completion, AIA, Document G704 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Affidavit for payment and subsequent release of retainage shall be based on the total retainage for all Work as defined in Section 01010, Sununary of Work. Submit Payment Application as outlined below 1 MA Document G702, covering total work to Date. 2. MA Document G703 to itemize each Part of Work as invoiced to the schedule of values for that Part of Work. 2.3 LIQUIDATED DAMAGES 3.1 C. 3.2 A. 3.3 A. SECTION 01011 PAGE 2 CONTRACT TIME AND SEQUENCE A. The Work of this Contract shall be commenced at once after the issuance of a written "Notice to Proceed" and shall be substantially completed within the specified Contract Time limits. Contractor shall reimburse Owner for any loss suffered through failure to meet the Construction Schedule. Should an extension of time be granted to the Contractor by Change Order signed by the Owner, the Contractor shall indemnify and save harmless the Owner and the Architect from any loss to any other Contractor or subcontractor caused by such extension. B. Refer to Article 3 Date of Commencement and Substantial Completion of the Agreement between Owner and Contractor for description of "Liquidated Damages." PART 3 CONTRACT ADMINISTRATION SEOUENCE DEFINITION A. Contract Administration shall proceed per the following only as approved by Architect. Submit at this time the following: 1 Section 01300 Construction Progress Schedule. 2. Section 01300 List of Proposed Subcontractors. 3.4 FIRST PROGRESS PAYMENT sequence. Deviations, if any shall be B Responsibility for activities shall be per Section 00510 00700, General Conditions. Refer to Divisions 1 through 16 Technical Specification for further requirements. COMMENCEMENT OF THE WORK Shall occur upon issuance of Section 00510 Notice to Proceed. PRECONSTRUCTION CONFERENCE Notice to Proceed, and per Section A. Submittal of Applications for Payment No. 1 (Section 01026, Payment Procedures) shall be preceded by the submittal and approval of the following: 1 Schedule of values per Section 01027 Schedule of Values. 2. Updated construction progress schedule per Section 01310, Progress Schedule. 3 Statement of intent to pay prevailing wages for each trade included in the request in a form agreeable to the Owner The statements shall be approved by the State of Washington, Department of Labor and Industries prior to submission. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.5 SUBSEQUENT PROGRESS PAYMENTS A. Submittal of Application for Payment (Section 01026, Payment Procedures) shall be accompanied by the submittal of documentation as outlined below 1. Updated construction progress schedule (Section 01310, Progress Schedule) '2. Affidavit of materials stored at site, if applicable 3 Affirmative action reports (Section 00821, Equal Employment Opportunity Requirement) 4 Statement of intent to pay prevailing wages for each trade included in the request in a form agreeable to the Owner The statements shall be approved by the State of Washington, Department of Labor and Industries prior to submission. 3.6 SUBSTANTIAL COMPLETION PAYMENT, OCCUPANCY A. Submission of Application for Payment and Certificate of Substantial Completion (Section 01026, Payment Procedures) to be submitted following substantial completion procedure. 3.7 FINAL PAYMENT COMPLETION, ACCEPTANCE A. Submission of Application for Payment and Affidavit for Payment of Retained Percentage (Section 01026, Payment Procedures) and other documentation as required by the Owner and/or described in Section 01700 Contract Closeout; final payment of retained percentage shall be for all work, partial payment of retained percentage shall not be allowed. PART 4 WORK SEOUENCE REOUIREMENTS 4.1 GENERAL SECTION 01011 PAGE 3 CONTRACT TIME AND SEQUENCE A. The Contractor shall schedule and supervise the work to accomplish completion within the Contract Time. B The Contractor shall schedule any work that impairs tenant operations to after hours or weekends. 1 Normal hours of operation are 7 AM to 7 PM, seven days a week. Work performed outside normal hours of operation, including the work described in paragraphs below must be reviewed and cleared with the Owner prior to start of work. 2. All work which involves penetrating the second floor slab into the ceiling space of the first floor, or penetrating the first floor slab into the ceiling space of the basement must be performed between the hours of 7 PM and 5 AM Monday through Friday and between the hours of 7 PM Friday and 5 AM Monday on weekends. All affected areas of the floors below must be cleaned, all materials and debris removed, and all acoustic ceiling panels replaced, or open areas of ceiling temporarily protected with plastic sheeting prior to 5 AM Monday through Friday 3 All work in the surgery area which involves sawcutting, roto hammering, using powder actuated fasteners, or other methods which may produce vibration or sudden noise, shall be performed between the hours of 5 PM and 5 AM Monday through Friday and between the hours of 5 PM Friday and 5 AM Monday on weekends. All affected occupied areas must be cleaned, all materials and debris removed, and all acoustic ceiling panels replaced, or open areas of ceiling temporarily protected with plastic sheeting prior to 5 AM Monday through Friday MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01011 PAGE 4 CONTRACT TIME AND SEQUENCE 4 All work at main entry vestibule to Surgery shall be performed between the hours of 5 PM Friday and 5 AM Monday on weekends. All affected areas must be cleaned, all materials and debris removed, and all acoustic ceiling panels replaced, or open areas of ceiling temporarily protected with plastic sheeting prior to 5 AM Monday 5 All work performed in occupied areas of the hospital, other than patient sleeping areas, is to be done outside normal business hours. All work performed in occupied patient sleeping areas is to be coordinated with the patient unit manager to establish a time when the affected rooms will be available for work. Contractor must be ready to suspend work at any time, clean area of tools, debris and residue, and vacate area of work within 30 minutes of being requested to do so by the Owner's representative. C. Work in occupied spaces of the Building shall be coordinated with the Owner's representative and the Owner at least one week in advance of the work. D Legal exitways shall be maintained at all times while building is occupied. E. All utility and service shutdowns required for connections to existing systems shall be performed after normal business hours at no additional cost. Electrical power interruptions are limited to one hour maximum. F All site work which interferes with roadways or parking is to occur on weekends between 6 PM Friday and 6 am Monday Steel plates or other adequate support are to be placed over open trenches in roadways and marked with appropriate signage when Contractor is not working. G. Upon request of the Property Owner or the Owner, the Contractor shall immediately stop work that is disruptive to building tenants, and reschedule the work for a time that will not interfere with the tenants. PART 5 SEOUENCE OF PHASING 5.1 GENERAL A. The Work will be conducted in three major phases in order for the Owner to maintain a minimum of four operating rooms available for surgical procedures at any time during the construction period. Each phase has sub- phases of work at the beginning and end in order to facilitate relocation of Owner's staff, construction and dismantling of temporary facilities and dustproof partitions, installation and testing of equipment, and completion of work by the Owner's hazardous materials contractor B. Timing of the sub phases is open to modification if sufficient notification can be given to the Owner and the Owner's staff. Changes in the substantial completion dates for each phase can only be effected by Change Order C. The Drawings are organized by areas, floor levels, and phases to illustrate the finished condition of work (other than temporary partitions and doors) at the end of each phase. The work completed in one phase is shown as an existing condition in the drawings for the subsequent phases. D Refer to Mechanical and Electrical drawings and specifications for additional phasing requirements particular to their scope of work. E. The following Sequence of Phasing is intended to be a description of one method for the Contractor to perform the Work while satisfying the Owner's operational needs. Contractor's bid shall be based on the specified sequence of phasing. The Contractor is welcome to propose MAIILUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS other methods as long as they fully satisfy the Owner's requirements. Deviations from the specified Sequence of Phasing must be fully documented by the Contractor, and reviewed and approved by the Architect and Owner prior to their implementation. 5.2 PHASE ONE (225 CALENDAR DAYS) SECTION 01011 PAGE 5 CONTRACT TIME AND SEQUENCE A. Phase One -A, (14 calendar days) Temporary Facilities. Contractor constructs temporary facilities to replace those to be demolished in Phase One. The following are to be completed prior to proceeding with Phase One -B 1 Construct Temporary Women s Locker room B012 and Temporary WC B013 in Basement. Relocate and re -use existing lockers, casework, toilet accessories, and other items as indicated or available to expedite completion. 2. Construct Temporary Men s Locker room R102 at Radiology Relocate and re-use existing lockers, casework, toilet accessories, and other items as indicated or available to expedite completion. 3 Relocate existing dialysis water hook -up box and drain from existing CCU Dialysis to room NW103 and provide additional work to establish dialysis services at NW103 4 Provide patient headwall services, including power, communications, oxygen, air, and vacuum, at Patient Room NW 104 5 Remove cabinets and operator shield wall at OR #3 room S128 in Surgery 6 Construct temporary Staff Toilet room S 104 at existing Cast Room in Surgery 7 Provide new water hook -up box and drain and new electrical receptacle at Patient Room NW250 to establish dialysis function. B. Phase One -B, (7 calendar days) Preliminary Demolition. Contractor proceeds with preliminary demolition after owner occupies temporary facilities. The following are to be completed prior to proceeding with Phase One -C: 1 Construct temporary partitions and doors at basement, first floor, and second floor and provide temporary exit signage. Delay building temporary partition for new Short Stay Waiting SS101 and Admissions SS102 until Patient Rooms SS132 and SS130 are complete. 2. Construct temporary exterior exit doors and pathways. 3 Provide temporary project fencing and safety signage at exterior areas of work. 4 Demolish interior wall finishes and ceilings to expose piping at 2 Main Patient Wing and at first floor Surgery area of work. 5 Begin construction of Patient Rooms SS132 and SS130 C. Phase One -C, (14 calendar days) Hazardous Material Abatement. Contractor to vacate 2 Main Patient Wing and first floor Surgery area of work to allow Owner's hazardous material abatement contractor to remove any identified hazardous material. Work may continue on exterior site and at Short Stay area of work. D Phase One -D (182 calendar days) Bulk of Construction. Contractor to perform majority of work associated with Phase One, including remainder of demolition, excavation, sitework, concrete, steel, exterior closure, and interior construction. 1 Within Phase One -D complete Patient Rooms SS132 and SS130 before demolishing existing patient rooms which will be replaced by new Short Stay Waiting SS101 and Admissions SS102. 2. Complete Short Stay Waiting SS101 and Admissions SS102 within Phase One -D MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 01011 PAGE 6 CONTRACT TIME AND SEQUENCE 3 Restore Shower rooms T001 and T002 in basement as soon as feasible after construction of new columns. E. Phase One -E, (7 calendar days) Clean -up and Substantial Completion. Contractor prepares completed areas of work for occupancy by Owner. 1. Complete Contractor's punchlist for review by Architect. 2. Remove temporary partitions and doors, do final clean-up, and provide construction barrier tape to secure areas of work until ready for occupancy by Owner. 3 Perform system balancing and provide any required owner instruction and training. 4 Clean and repair OR #3 S128 for use as Operating Room (this work should start prior to this phase.) 5 Remove temporary exterior walkways and protective fencing. 5.3 PHASE TWO (125 CALENDAR DAYS) A. Phase Two-A, (7 calendar days) Transition. Contractor removes Phase One temporary facilities and constructs Phase Two temporary facilities. The following are to be completed prior to proceeding with Phase Two -B 1 Restore Temporary Men s locker room R102 to office for Radiology Director 2. Convert temporary Staff Toilet room S104 to temporary Housekeeping closet. 3 Relocate hazardous materials shed north of Central Services. Construct temporary stairs north of Surgery and provide temporary exit door B Phase Two -B, (7 calendar days) Preliminary Demolition. Contractor proceeds with preliminary demolition. The following are to be completed prior to proceeding with Phase Two -C• 1 Construct temporary partitions and doors at Surgery and provide temporary exit signage. 2. Demolish interior wall finishes and ceilings to expose piping at Phase Two area of work. C. Phase Two -C, (7 calendar days) Hazardous Material Abatement. Contractor to vacate Phase Two area of work to allow Owner's hazardous material abatement contractor to remove any identified hazardous material. D Phase Two -D (97 calendar days) Bulk of Construction. Contractor to perform majority of work associated with Phase Two, including remainder of demolition, elevator, and interior construction. E. Phase Two -E, (7 calendar days) Clean-up and Substantial Completion. Contractor prepares completed areas of work for occupancy by Owner 1 Complete Contractor's punchlist for review by Architect. 2. Remove temporary partitions and doors, do final clean-up, and provide construction barrier tape to secure areas of work until ready for occupancy by Owner 3 Perform system balancing and provide any required owner instruction and training. 5.4 PHASE THREE (125 CALENDAR DAYS) A. Phase Three -A, (7 calendar days) Transition. Contractor removes Phase Two temporary facilities. The following are to be completed prior to proceeding with Phase Two -B 1 Remove temporary Anesthesia Workroom S 146 and temporary Anesthesia Store room S147 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 01011 PAGE 7 CONTRACT TIME AND SEQUENCE B. Phase Three -B, (7 calendar days) Preliminary Demolition. Contractor proceeds with preliminary demolition. The following are to be completed prior to proceeding with Phase Three -C: 1 Construct temporary partitions and doors at Surgery and provide temporary exit signage. 2. Demolish interior wall finishes and ceilings to expose piping at Phase Two area of work. C. Phase Three -C, (7 calendar days) Hazardous Material Abatement. Contractor to vacate Phase Three area of work to allow Owner's hazardous material abatement contractor to remove any identified hazardous material. D Phase Three -D (97 calendar days) Bulk of Construction. Contractor to perform majority of work associated with Phase Three. E. Phase Three -E, (7 calendar days) Clean-up and Substantial Completion. Contractor prepares completed areas of work for occupancy by Owner 1. Complete Contractor's punchlist for review by Architect. 2. Remove temporary partitions, stairs, and doors, do final clean-up, and provide construction barrier tape to secure areas of work until ready for occupancy by Owner 3 Perform system balancing and provide any required owner instruction and training. 4 Relocate hazardous materials storage back to original position. 5 Convert temporary housekeeping back to Cast Room S104 F Phase Three -F (3 weekends) After temporary partitions are removed, work over three successive weekends to complete ceiling and flooring in 'Sterile Corridor O 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 01011 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL SECTION 01014 PAGE 1 PROJECT FINISHES AND OPENINGS 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091 Reference Standards. 1.3 DESCRIPTION A. Provide materials and finishes as specified herein, and as scheduled and shown. B. Room materials and finishes are scheduled in Volume 2 Project Drawings. C. Door openings are scheduled in Volume 2 Project Drawings. D The extent and details of the work are shown in the drawings. 1.4 PRIORITY OF THE DOCUMENTS A. In event of conflict between documents, provide the most expensive work specified, scheduled or shown. B. In event of work shown or scheduled, but not specified, provide the work as indicated per specifications to be furnished upon request by the Architect. PART 2 ROOM MATERIAL AND FINISH REOUIREMENTS 2.1 GENERAL A. Provide materials and/or finishes in rooms as specified herein, and as scheduled and shown on drawings. B See the Room Finish Schedule in Volume 2 Project Drawings. C. For room locations, details, and extent, refer to the drawings. In existing rooms listed on Room Finish Schedule, Where surfaces are listed as existing' provide new finishes to match existing where surfaces are damaged by work in this contract. Carry new finishes to natural break in construction such as a change in plane or construction joint. 2.2 CODES A. Conform with Section 01065 Code and Permit Requirements. B Comply with State Fire Marshal's requirements. C. Interior Finishes shall comply with the Building Code (see Section 01065 Code and Permit Requirements) as follows: Enclosed Vertical Other Rooms Stairways Exitways or Area Class I II III Flame Spread 0 -25 26 -75 76 -225 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.3 GENERAL NOTES TO FINISH SCHEDULE A. Provide the following if not shown elsewhere. B Painting: Provide 09900 paint throughout on. 1 09250 gypsum board 2. 06200 wood 3 08100 hollow metal 4 08200 wood doors 5 All exposed structural, mechanical and electrical work, interior and exterior, except prefinished items C. Closets: Provide same finishes as adjoining room unless otherwise indicated. D Typical Room Finish. Provide the following finishes for all rooms and spaces if no other finishes are indicated. 1 Floor and Base: Provide 09666 vinyl sheet flooring with 6 inch topset vinyl base. 2. Walls: Provide 09250 gypsum board with 09900 paint. 3 Ceiling and Acoustic Treatment: Provide 09540 ceiling suspension and 09500 acoustic panel. PART 3 DOOR OPENING REOUIREMENTS 3.1 GENERAL NOTES TO DOOR OPENING SCHEDULE A. See Door Opening Schedule in Volume 2 Project Drawings. 0 1997 Mahium Nordfors McKinley Gordon SECTION 01014 PAGE 2 PROJECT FINISHES AND OPENINGS END OF SECTION 01014 r 1 t 1 MAHLUM NORDFORS MIILTLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS B. Section 00003 Table of Contents C. Section 01010, Summary of Work D Section 01011, Contract Time and Sequence E. Section 01030, Base Bid and Alternates F Section 01065 Code and Permit Requirements G. Section 01091, Reference Standards H. Section 01095 Explanations, Definitions, Abbreviations, Symbols I. Section 01630 Product Options and Substitutions J Section 01700 Contract Closeout K. Section 01710 Final Cleaning 1.2 DESCRIPTION 1.3 INCORPORATED DOCUMENTS SECTION 01026 PAGE 1 PAYMENT PROCEDURES A. Divisions 0 and 1 apply to the work specified in each section of Divisions 2 through 16 Make particular reference to the following sections: A. Progress payment shall be made per Section 00700 General Conditions, and as specified hereinafter A. The following documents are incorporated as a part of the contract documents as if bound herein. 1 Application and Certificate for Payment, MA Document G702 2. Continuation Sheet, MA Document G703 3 Certificate of Substantial Completion, MA Document G704 4 Contractor's Affidavit of Release of Liens, MA Document G706A 5 Contractor's Affidavit of Payment of Debts and Claims, AIA Document G706 6 Consent of Surety Company to Final Payment, MA Document G707 B. The following documents are bound herein and incorporated as a part of the contract documents: 1 Affidavit for Payment of Retained Percentage, Mahlum Nordfors McKinley Gordon Form MN1060 C. Payment procedures shall comply with requirements of the above incorporated forms and shall be per Section 00700 General Conditions. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 2 PRODUCTS (NOT USED PART 3 EXECUTION 3.1 SCHEDULE OF VALUES SECTION 01026 PAGE 2 PAYMENT PROCEDURES A. Suibmit per Section 01011, Contract Time and Sequence, and Section 01027 Schedule of Values. Form of submission to include all divisions and sections included in Section 00003 Table of Contents. B. Schedule of Values shall be used only as a basis for application for payment. 3.2 APPLICATION AND CERTIFICATION FOR PAYMENT A. Each application shall consist of AIA Documents G702 and G703 B. Submit per Section 01011 Contract Time and Sequence. C. Contractor shall review draft of application with Architect prior to submittal. D Retainage on AIA Document G702 shall be per Owner /Contractor agreement. E. Statement of intent to pay prevailing wages, for each trade included in the request, in a form agreeable to the Owner The statements shall be approved by the State of Washington Department of Labor and Industries prior to submission. 3.3 REQUEST FOR PAYMENT OF RETAINED PERCENTAGE A. The following forms are required. 1 Form MN1060 certifying that all payrolls, bills, claims, liens, or any other indebtedness for which the Owner or his property might in any way be responsible have been paid or are otherwise satisfied 2. MA Document G707 3 AIA Document G706A 4 AIA Document G706 5 Affidavit of wages paid in form acceptable to Owner Affidavit shall receive certification from the State of Washington, Department of Labor and Industries, prior to submission to Owner 6 Letter of release of liabilities from State of Washington, Department of Labor and Industries. 7 State of Washington Department of Revenue Certification. B. If required by the Owner, provide other data establishing payment or satisfaction of all such obligations such as receipts, releases, and waivers of liens arising out of the contract to the extent and in such form as may be designated by the Owner C. If any subcontractor refuses to furnish a release or waiver required by the Owner the Contractor may furnish a bond satisfactory to the Owner to indemnify him against any such lien. D If any such lien remains unsatisfied after any such payments are made, the Contractor shall refund to the Owner all moneys that the latter may be compelled to pay in discharging such lien, including all cost and reasonable attorney fees. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 CERTIFICATE OF SUBSTANTIAL COMPLETION SECTION 01026 PAGE 3 PAYMENT PROCEDURES A. Architect will issue AIA Document G704 per Section 01011, Contract Time and Sequence. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 01026 1 1 1 1 1 1 A F F I D A V I T F O R P A Y M E N T O F R E T A I N E D P E R C E N T A G E To Mahlum Nordfors McKinley Gordon This affidavit is executed as a part of the foregoing application for final payment: STATE OF WASHINGTON County of The undersigned, being first duly sworn on oath, disposes and says. 1 That he /she is the of having its principal place of business at 2. That said Contractor is constructing for 3 That as of this date, all persons, firms, and corporations furnishing labor and/or materials in connection with the above described construction, at the request of and for and on behalf of the Contractor described above, have been paid in full, and no person, firm, or corporation who has furnished labor and/or materials to the Contractor herein for the above described construction or the real property described herein, or the retained percentage of the contractor for labor and materials, except as follows: a. Retained percentages due subcontractors, payable upon payment of retained percentage to Contractor by Owner, and b Subcontractor progress payments billed in payment estimate 4 That there are no municipal, state, or federal charges, levies, or taxes, unpaid or delinquent, which constitute an encumbrance, claim, or lien against said construction, or said real property or the Contractor's bond, or the retained percentage of the contract. 5 That this affidavit is made by the Undersigned with a full understanding of the facts as set forth herein, and for the purpose of inducing the Owner to make payment to the retained percentage of final payment to the Contractor on the assurance that there are no liens, claims, or encumbrances, under the contract, which may in any way reflect against: (by) SUBSCRIBED AND SWORN to before me this day of 19 NOTARY PUBLIC in and for the State of Washington, residing at AFFIDAVIT FOR PAYMENT OF RETAINED PERCENTAGE FINAL PAYMENT (date) Mahlum Nordfors McKinley Gordon 1997 Form 1060 8/97 MAHLUM NORDFOR McKINLEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206 44 1 -4 15 1 206 441 0478 F MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. e 1.2 DESCRIPTION A. Provide schedule of value submittals as indicated herein. PART 2 REOUIREMENTS SECTION 01027 PAGE 1 SCHEDULE OF VALUES 2.1 GENERAL A. Prepare per Section 01300 Submittals, Section 00700 General Conditions, and as follows. B Purpose is to establish value of every item of the work for use in each request for progress payment. C. Review outline of proposed schedule with Architect prior to final submission. 2.2 FORMAT A. Title "Section 01027 Schedule of Values. Type on MA Document G703 Continuation Sheet. B Break out costs per specification divisions and sections (except Division 0) as listed in Section 00003 Table of Contents, unless other method is agreed upon with the Architect. Break down items into subcomponents, materials, installation, etc. so no line item exceeds $50 000 C. Divide costs into phases so the values for the line items in paragraph 2.2.B are accurately apportioned to each phase. This may take the form of three separate Schedules of Values, one for each phase. D Each cost item shall include its proportionate share of project overhead and profit. E. Include line item for As- builts and O &M Manuals' equal to 1% of the total value each for Architectural (Divisions 2 14), Mechanical (Division 15), and Electrical (Division 16), or $1,000 each, whichever is the lesser 2.3 REQUIRED INFORMATION A. Each element of the project, identified with specification section number and title B. Costs for each item C. Total of costs which equals the contract sum D Contractor's signature and date 2.4 DISTRIBUTION A. Submit four copies to the Architect with certification statement included in this section. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3 SCHEDULE OF VALUES Date: To MAHLUM NORDFORS MCKINLEY GORDON a From. By (Contractor) jSignature) This is to certify that this Schedule of Values has been prepared in accordance with the contract documents and that values listed are correct and show the proper cost, including overhead and profit, to provide each item of the work. These values shall be the basis for future Application for Payment. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01027 PAGE 2 SCHEDULE OF VALUES END OF SECTION 01027 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART I GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES SECTION 01030 PAGE 1 BASE BID AND ALTERNATES A. Comply with Section 00030 Invitation to Bid, and Section 00100, Instructions to Bidders. B. Each bidder shall state in his bid, in the spaces provided on the Bid Form (Section 00300), the following: 1 Base Bid. Bid for performing the work of the base bid as described below 2. Alternate Bids: Bid for performing additional items of work, omitting items of work, substituting materials or construction for those specified in the base bid, all as described below State the amount to be added to or deducted from the base bid. C. No sales tax shall be included for any of the bid prices. D The above terms are used as defined in Section 00100 Instructions to Bidders. 1.3 DESCRIPTION A. Base bid is the sum proposed to perform all general, mechanical, and electrical work as specified and shown in Divisions 0 through 16 (specifications) and Divisions A, M, and E (project drawings) also referred to as the contract documents. B The following items are excluded from the above base bid. 1 Work included in the following additive or deductive alternates 2 Work specifically shown or noted as not in contract (MC) 1.4 DESCRIPTION OF ALTERNATES A. An alternate is an amount proposed by bidders and stated on the Bid Form (Section 00300) for certain construction activities defined in the bidding requirements that may be added to or deducted from base bid amount if the Owner decides to accept a corresponding change in either the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the contract documents. 1.5 ALTERNATES A. Coordination. Coordinate related work and modify or adjust adjacent work as necessary to ensure that work affected by each accepted alternate is complete and fully integrated into the project. B Notification. Immediately following the award of the contract, prepare and distribute to each party involved notification of the status of each alternate. Indicate whether alternates have been accepted, rejected, or deferred for consideration at a later date. Include a complete description of negotiated modifications to alternates. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 2 PRODUCTS (NOT USED PART 3 EXECUTION 3.2 SCHEDULE OF ALTERNATES (NOT USED) 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01030 PAGE 2 BASE BID AND ALTERNATES C. Schedule 1 A schedule of alternates is included at the end of this section. Specification sections referenced in the schedule contain requirements for materials and methods necessary to achieve the work described under each alternate. 2. Include as part of each alternate miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not mentioned as part of the alternate. 3.1 GENERAL A. Alternate bids may or may not be accepted by Owner B Bid prices for alternates shall include adjustments in the work of all materials and trades as may be necessary because of additions, deletions, or substitutions. C. Rough -ins and all other provisions required for the future installation of items of work omitted in base bid or in deductive alternates shall remain in the contract unless otherwise stated. Refer to drawings or specifications for explanations of cut -off- points of work remaining. D Work which may be added in alternates shall become part of and be governed by the provisions of the specification sections for like materials and construction. E. In alternate descriptions, reference to architectural drawings shall be interpreted as all inclusive reference to any other project drawings showing the work. END OF SECTION 01030 MAHLUM NORDFORS McKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in each section of Divisions 2 through 16 Make particular reference to the following sections: 1 Section 00003 Table of Contents 2. Section 01010 Summary of Work 3 Section 01011 Contract Time and Sequence 4 Section 01030 Base Bid and Alternates 5 Section 01065 Code and Permit Requirements 6 Section 01091, Reference Standards 7 Section 01095 Explanations, Definitions, Abbreviations, Symbols 8 Section 01630 Product Options and Substitutions 9 Section 01700, Contract Closeout 10 Section 01710 Final Cleaning 1.2 DESCRIPTION A. The contract may be changed per Section 00700 General Conditions, and as follows. 1.3 INCORPORATED DOCUMENTS A. The following documents are a part of the contract documents: 1 Change Order Proposal, Mahlum Nordfors McKinley Gordon Form 1038 2. Change Order Mahlum Nordfors McKinley Gordon Form 1039 3 Architect's Supplemental Instructions, Mahlum Nordfors McKinley Gordon Form 1036 4 Construction Change Directive, Mahlum Nordfors McKinley Gordon Form 1037 B Change order proposals, change orders, architect's supplemental instructions, and construction change directives shall comply with requirements of the above incorporated forms and shall be per Section 00700, General Conditions. PART 2 PRODUCTS (NOT USED PART 3- EXECUTION 3.1 ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS SECTION 01036 PAGE 1 CHANGE ORDER PROCEDURES A. Architect's Supplemental Instructions (Form 1036) is bound herein and incorporated as a part of the contract documents. B Architect's Supplemental Instructions are used to clarify the scope of work or make changes to the work which have no effect on the contract sum or contract time. Notify the Architect immediately if the supplemental instruction is anticipated to require a change to the contract sum or contract time. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS •ALTERATIONS 3.2 CHANGE ORDER PROPOSALS A. Change Order Proposal (Form 1038) is bound herein and incorporated as a part of the contract documents. B. Contractor shall complete proposal portion of form and return original to Architect for action. C The Contractor shall not proceed with the work described in the proposal until the proposal is accepted by the Owner 3.3 CONSTRUCTION CHANGE DIRECTIVES A. Construction Change Directive (Form 1037) is bound herein and incorporated as a part of the contract documents. B. Proceed with the work described in the construction change directive immediately upon receipt of the signed form. C. Fill in the cost, sign, and forward the construction change directive form with requested backup documents to the Architect. 3.4 CHANGE ORDERS 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01036 PAGE 2 CHANGE ORDER PROCEDURES A. Change Order (Form 1039) is bound herein and incorporated as a part of the contract documents. B The Change Order is the instrument by which changes in contract sum or contract time are incorporated into the contract. Accepted change order proposals and construction change directives shall be the basis for contract change orders. C. Contract change orders may incorporate more than one change order proposal or construction change directive. END OF SECTION 01036 t 1 1 1 1 PROJECT Olympic Memorial Hospital 2 Main /Surgery Additions Alterations OWNER. Olympic Memorial Hospital OWNER S Mike Glenn REPRESENTATIVE TO a CHANGE O R D E R P R O P O S A L N O PROJECT NO 96160.00 CONTRACT DATE September 26, 1996 COPIES TO Mahlum Nordfors McKinley Gordon Request Please furnish your proposal to us for performing the following change(s): ATTACHMENTS BY DATE Contractor Proposal: We propose to perform the change(s) described above for the following change(s) in the Contract Sum and the Contract Time (a detailed cost estimate is attached): Contract Sum. addition deduction of Contract Time: extension reduction of (excluding state sales tax) calendar days This proposal includes any and all necessary adjustments to the construction schedule and all direct and indirect costs. All further claims for additional compensation, time, or damages arising out of the changed work addressed in this proposal are waived upon the Owner's acceptance of this proposal. Contractor. BY DATE Mahlum Nordfors McKinley Gordon Recommendation: We have carefully examined the above proposal, find it to be in order and the cost reasonable, and recommend its acceptance. BY DATE Owner Acceptance: We hereby accept the above proposal. BY DATE. This form, when igned above constitutes the conditions upon which the Architect will issue Change Order for the above changes Mahlum Nordfors McKinley Gordon 1997 Form 1038 8/97 MAHLUM NORDFORS McKINLEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206 441 -4151 206 441 0478 F PROJECT Olympic Memorial Hospital 2 Main /Surgery Additions Alterations CHANGE ORDER N O PROJECT NO 96160.00 OWNER. Olympic Memorial Hospital CONTRACT DATE OWNER S REPRESENTATIVE The Owner and the Contractor agree to the following change(s): ATTACHMENTS Contract Time: Before this Change Order, the date of substantial completion was: The Contract Time change because of this Change Order is: With this Change Order, the new date of substantial completion will be: Contract Sum Mike Glenn The original contract sum was: The net change in the Contract Sum by previously authorized Change Orders is: days The amount of this Change Order is: The new Contract Sum will be: The above summary does not reflect changes in the Contract Sum or Contract Time which have been authorized by Construction Change Directive. This Change Order becomes valid once signed by the Owner, Contractor, and Architect, and is effective on the date of Owner's Authorization. ISSUED BY Mahlum Nordfors McKinley Gordon BY DATE. CONFIRMED BY Contractor BY DATE AUTHORIZED BY Olympic Memorial Hospital BY DATE. Mahlum Nordfors McKinley Gordon 1997 Form 1039 8/97 MAHLUM NORDFOR McKINLEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206 441 -4151 206 441 0478 F 1 I I I 1 I I I I I I I I I I PROJECT Olympik Memorial Hospital 2 Main /Surgery Additions Alterations OWNER. Olympic Memorial Hospital OWNER S REPRESENTATIVE Mike Glenn TO COPIES TO ATTACHMENTS ARCHITECT'S SUPPLEMENTAL I N S T R U C T I O N NO Issued by Mahlum Nordfors McKinley Gordon By Accepted by Contractor By PROJECT NO 96160.00 CONTRACT DATE. Proceed immediately with the following at no change in the Contract Time or the Contract Sum. If you believe this Supplemental Instruction requires a change in either the Contract Time or Contract Sum, contact the Architect within five days of receipt and do not proceed with the following. Otherwise, this change(s) shall be binding to the contract. Date: Date: 0 Mahlum Nordfors McKinley Gordon 1997 Form 1036 9/97 MAH LU M NO'RDFORS Mc BIN LEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206 441 -4151 206 441 0478 F e 1 1 1 C O N S T R U C T I O N CHANGE D I R E C T I V E OWNER OWNER S REPRESENTATIVE. e By Owner Directive Mike Glenn ATTACHMENTS ADJUST THE CONTRACT SUM AS FOLLOWS ADJUST THE CONTRACT TIME AS FOLLOWS N O PROJECT Olympic Memorial Hospital 2 Main /Surgery Additions Alterations Olympic Memorial Hospital TO COPIES TO Mahlum Nordfors McKinley Gordon Recommendation Make the following change(s) in this contract: PROJECT NO 96160.00 CONTRACT DATE Date: Upon receipt of this signed document, you are hereby directed to proceed immediately with the change(s) described above. By Date: Contractor Agreement/Disagreement We have carefully examined the above adjustment and (0 agree) (0 disagree) with the adjustments to the Contract Sum and Contract Time. By Date- Following agreement by the Contractor on above adjustments to the Contract Sum and Contract Time, a Change Order will be issued. Mahlum Nordfors McKinley Gordon 1997 Form 1037 8/97 MAHLUM NORDFORS McKINLEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206 441 -4151 206 441 0478 F 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION SECTION 01045 PAGE 1 CUTTING AND PATCHING A. Definition. Cutting and patching is hereby defined to include but is not necessarily limited to the cutting and patching of nominally completed or previously existing work in order to accommodate the coordination of work or the installation of other work or to uncover other work for access or inspection or to obtain samples for testing or for similar purposes and is defined to exclude integral cutting and patching during the manufacturing, fabricating, erecting, and installing process for individual units of work. Drilling the work to install fasteners and similar operations are included under their specific sections. B General Work: The Contractor represents that he has carefully reviewed all demolition, removal, modification, cutting, and patching requirements of all subtrades and that he has included in his bid the cost for all such requirements for work specified and as further stated below C. Mechanical and Electrical Work, Divisions 15 and 16, and Site Utilities: The Contractor represents that he has advised his bidders for the mechanical and electrical work to include in their work all costs of cutting, patching, and coring; disconnecting electrical services; disconnecting and capping utility lines at present locations; connections to new locations and modification in piping runs; and electrical devices, as may be required for the installation and completion of other work in the area. The Contractor represents that he has reviewed the site and will remove and replace any and all mechanical and electrical items as required for new work whether shown on the drawings or not to produce a complete product as required by code and implied by the balance of the contract documents. 1.4 SUBMITTALS A. Comply with Section 01300 Submittals. 1.5 QUALITY ASSURANCE A. General. Comply with Section 01400, Quality Control. B. Requirements for Structural Work: Do not cut and patch structural work in a manner resulting in a reduction of load- carrying capacity or load/deflection ratio. Notify Architect if work resulting in structural integrity loss is apparent. C. Operational and Safety Limitations: Do not cut and patch operational elements and safety- related components in a manner resulting in a reduction of capacities to perform in a manner intended or resulting in decreased operational life, increased maintenance, or decreased safety D Visual Requirements: Do not cut and patch work which is exposed to the exterior or exposed in occupied spaces of the building in a manner resulting in a reduction of visual qualities or resulting in substantial evidence of the cut and patch work, both as judged solely by the Architect. Remove and replace work judged by the Architect to be visually unsatisfactory MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 DELIVERY STORAGE, AND HANDLING A. Comply with Section 01610 Delivery Storage, and Handling. 1.7 PROJECT CONDITIONS A. Verify conditions at site affecting work to ensure the best and most complete cutting and patching per industry standards. 1.8 SCHEDULING A. Comply with Section 01310 Progress Schedule. 1.9 WARRANTY A. Comply with Section 01745 Warranty Procedures. PART 2 PRODUCTS 2.1 MATERIALS A. Except as otherwise indicated or approved by the Architect, provide materials for cutting and patching which will result in equal or better work than the work being cut and patched in terms of performance characteristics and including visual effect where applicable. Comply with the requirements and use materials identical, including color, with the original where feasible and where recognized that satisfactory results can be produced thereby PART 3 EXECUTION 3.1 INSPECTION A. Inspect existing conditions, including elements subject to damage or movement, during cutting and patching. B Inspect after uncovering cutting and patching. C. Beginning of cutting or patching means acceptance of existing conditions. 3.2 PREPARATION 3.3 PERFORMANCE SECTION 01045 PAGE 2 CUTTING AND PATCHING A. Temporary Support: Provide adequate temporary support for work to be cut to prevent failure. Do not endanger other work. B. Protection: Provide adequate protection of other work during cutting and patching to prevent damage and provide protection of the work from adverse weather exposure. Take precautions not to cut existing pipe, conduit, or duct serving the building but scheduled to be relocated until provisions have been made to bypass them. A. General 1 Execute cutting, fitting, and patching, including excavation and fill, to complete work and to a. Fit the several parts together to integrate with other work. b. Uncover work to install ill -timed work. 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01045 PAGE 3 CUTTING AND PATCHING c. Remove and replace defective and nonconforming work. d. Remove samples of installed work for testing. e. Provide openings in elements of work for penetrations of mechanical and electrical work. 2. All work to be performed in a "workmanlike" manner Employ skilled tradesmen to perform cutting and patching. Except as otherwise indicated or approved by the Architect, proceed with cutting and patching at the earliest feasible time, in each instance, and perform the work promptly 3 Execute work by methods to avoid damage to other work and to provide proper surfaces to receive patching and finishing. 4 If possible, employ original installer or fabricator to perform cutting and patching for sight exposed surfaces. 5 Restore work with new products in accordance with requirements of contract documents. 6 Fit work airtight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces. 7 At penetrations of fire -rated material, provide proper thickness of the construction element to maintain the required fire rating. For penetrations and recessed items larger than or more numerous than allowed by Uniform Building Code Section 4304(f), provide appropriate blocking, and continuation of the construction element to maintain the required fire rating. 8. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for an assembly refinish entire unit. B. Cutting 1 Cut work by methods least likely to damage work to be retained and work adjoining. Review proposed procedure with original installer where possible and comply with his recommendations. 2. In general, where mechanical cutting is required, cut work with sawing and grinding tools, not with hammering and chopping tools. Core drill openings through concrete work. C. Patching 1 Patch with seams which are durable and as invisible as possible. Comply with specified tolerances of the work. Where feasible, inspect and test patched areas to demonstrate integrity of work. 2. Restore exposed finishes of patched areas and, where necessary extend finish restoration onto retained work adjoining in a manner which will eliminate evidence of patching. 3 Where patch occurs in a smooth painted surface, extend final paint coat over the entire unbroken surface containing the patch. D Cutting and Patching for Work by Subcontractors: Cutting and patching for mechanical and electrical work will be included in the cost for mechanical and electrical work, respectively and will be performed in accordance with this section and Division 15 Mechanical, and Division 16 Electrical. See Divisions 15 and 16 for additional instructions. 3.4 FIELD QUALITY CONTROL A. Comply with Section 01400 Quality Control. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS B. Provide experienced supervision of all elements of the work of this section. 3.5 CLEANING AND PROTECTION 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01045 PAGE 4 CUTTING AND PATCHING A. Comply with Section 01500, Construction Facilities and Temporary Controls, and Section 01710 Final Cleaning. B. Thoroughly clean areas and spaces where cutting and patching is performed or used as access. Remove completely paint, mortar, oils, putty and items of similar nature. Thoroughly clean piping, conduit, and similar features before painting or other finishing is applied. Restore damaged pipe covering to its original condition. END OF SECTION 01045 MAHLUM NORDFORS McKINLEY GORDON SECTION 01064 PAGE 1 OLYMPIC MEMORIAL HOSPITAL SEISMIC ANCHORAGE 2 MAIN/SURGERY ADDITIONS ALTERATIONS REQUIREMENTS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A complete list of standards is located in Section 01091 Reference Standards. 1.3 DESCRIPTION A. The purpose of this section is to provide instruction relating to the design and construction of anchorage requirements for mechanical and electrical equipment and components. It is required that these items be anchored to the facility in a manner whereby the overall reliability of the facility is not compromised. B Unless otherwise determined by the Architect, it is not intended that any item of purchased equipment be modified to meet the requirements of this section. C. Related work specified elsewhere includes: 1 Division 9 Finishes 2. Division 15 Mechanical 3 Division 16, Electrical 1.4 INSPECTION A. Installation of all wedge- anchors shall be performed under the continuous inspection of a certified inspector B. Field tests of the anchorage shall be performed by a licensed testing laboratory under the supervision of a certified inspector 1.5 GENERAL CONNECTION REQUIREMENTS A. All supports and connections shall be designed by a registered structural engineer licensed in the State of Washington. in accordance with the Uniform Building Code, Zone 3 The Contractor shall retain this engineer to perform the design work. B SMACNA guidelines shall be used for the design of seismic restraints of mechanical systems (and cabinets), with the additional requirements dictated by Paragraph 1.3 above and the specific requirements and exceptions specified in this section. C. Acquisition of design data and installation of gravity and seismic anchorages (restraints) shall be the responsibility of the Contractor unless otherwise noted in this section. Design data and shop drawings shall be provided in accordance with Paragraph 1 8 below 1.6 DISTRIBUTION OF GRAVITY AND SEISMIC LOADS TO STRUCTURE A. It is the responsibility of the Contractor to see that the combined equipment and system and piping loads do not exceed the capacity of any individual supporting structural member or group of structural members. MAHLUM NORDFORS McKINLEY GORDON SECTION 01064 PAGE 2 OLYMPIC MEMORIAL HOSPITAL SEISMIC ANCHORAGE 2 MAIN/SURGERY ADDITIONS ALTERATIONS REQUIREMENTS B. Supplemental structural distribution members shall be required when equipment gravity and seismic loads exceed design loads shown on the structural drawings and specifications. Requirements will be established by the Architect. C. All systems and equipment shall be connected to the building's structural system in a rigid manner except units with special vibration isolation mounting requirements. D The Contractor shall make available to the Architect that information required to verify the anchorage (restraint) of the following critical equipment: 1 In -line centrifugal fans 2. Vaneaxial fans and cabinet fans 3 Air handling units 4 Chillers 5 Boiler and breeching/stack 6 Chilled water pumps 7 Hot water heating and circulation pumps 8 Storage tanks 9 Condenser water pumps 10 Compression tanks 11 Air compressors 12. Cooling towers 13 Cooling tower separator and pump 14 Converter 15 Domestic water booster pump assembly 16. Fire pump and controller 17 Air conditioning units 18. Fan coil units 19 Engine generators, switchgear, mufflers, and radiators 20 Service switchgear 21 Distribution panels (floor- mounted) 22. Motor control centers 23 Transformers E. Information to be provided shall include, but not necessarily be limited to, the following: 1 Center of gravity 2. Weight 3 Footprint 4 Space envelope 5 Tie -down provisions MAHLUM NORDFORS McI INLEY GORDON SECTION 01064 PAGE 3 OLYMPIC MEMORIAL HOSPITAL SEISMIC ANCHORAGE 2 MAIN/SURGERY ADDITIONS ALTERATIONS REQUIREMENTS 1.7 CONNECTION REQUIREMENTS BY LOCATION AND STRUCTURAL MEMBER A. Slabs on Grade 1 Conduits, pipe, and ducts may be fastened to the grade slab with supports spaced in accordance with the requirements of Division 15 Mechanical, and Division 16 Electrical. 2. For heavy building equipment (500 pounds or more), submit information on the following for review a. Weight b. Dimensions c. Center of gravity d. Vibration criteria e. Base connection details 3 The type of fastener to be used on the grade slab connections shall be either cast -in -place anchor bolts or wedge anchors as specified in Paragraph 1 7 below B. Suspended Slabs 1 Same as requirements for Paragraph 1 6.A above with modifications specified in Paragraph 1 6.E below 2. For heavy building equipment (500 pounds or more), submit information on the following for review a. Weight b Dimensions c. Center of gravity d. Vibration criteria e. Base connection details 3 The type of fastener to be used on the suspended floor and roof slabs shall be wedge anchors as specified in Paragraph 1 7 below C. Suspended Ceilings: Support and brace in accordance with UBC requirements. D Lighting Fixtures: In suspended ceilings, provide auxiliary supports to the structure in accordance with UBC requirements. MAHLUM NORDFORS McKINLEY GORDON SECTION 01064 PAGE 4 OLYMPIC MEMORIAL HOSPITAL SEISMIC ANCHORAGE 2 MAIN/SURGERY ADDITIONS ALTERATIONS REQUIREMENTS E. Equipment and Systems Suspended from Underside of Suspended Slabs or Roof 1 Provide gravity hangers or frames for conduit and pipes running perpendicular to the floor joists or beams. Space the hangers as follows: Pine Size Maximum Spacing 2 1/2 -inch 11 feet 4 -inch 14 feet 5 -inch 16 feet 6 -inch 16 feet 8 -inch 14 feet 10 -inch and over Layout subject to approval of Architect 2. Provide gravity hangers at 10 feet maximum for ducts running perpendicular to joists and beams. 3 Pipes, conduits, and ducts that are oriented parallel to joists or beams shall have vertical supports spaced at a maximum of 10 feet. Supports shall be attached to spreader beams connected to two or more joists as required by the Architect. 4 Lateral or transverse seismic sway bracing shall be provided at 25 feet maximum. It may be anchored at each girder that is oriented perpendicular to the pipe, conduit, or duct. Location of the intermediate bracing between main girder lines shall be staggered for the individual runs and trades to avoid the concentration of loads on any individual joist or beam. 5 Longitudinal seismic bracing may be located at girders, with a maximum spacing of 50 feet on center and at ends, turns, and bends with the same restriction as noted in Paragraph 1 6.E.4 above. F Vertical Runs Between Floors: Provide tube or metal stud supports in accordance with requirements of this section. Connect to concrete floor or steel framing as noted in Paragraph 1 7 below 1.8 GENERAL CONNECTIONS TO STRUCTURE A. The following wedge anchors (approved by ICBO) may be used as attachments to the concrete slabs. Phillips Red -head, Parabolt, Dynabolt, Star, and Ramset. For seismic design of the anchorage, a safety factor of 3 shall be used with the ultimate -rated capacity of the anchorage. For gravity load design at working stress, a safety factor of 5 shall be applied to the ultimate rated capacity of the anchorage. These safety factors apply for continuous inspection, as specified in Paragraph 1 10 below Installation of wedge anchors shall be field tested as specified in Paragraph 1 9 below B At suspended slabs, wedge- anchors shall be located at the thickened areas of slabs with metal deck. C Welded and bolted connections are not permitted to the main structural members (e.g. beams, girders, columns, braces, etc.) except as noted in the following or by special approval. 1 Clip angles or plate angles may be welded to structural columns, girders, and beams (flanges and webs) with 3/16 -inch by 3 -inch maximum fillet welds. 2. Verify all bolted connections used to webs of steel shapes with Architect. MAHLUM NORDFORS McKINLEY GORDON SECTION 01064 PAGE 5 OLYMPIC MEMORIAL HOSPITAL SEISMIC ANCHORAGE 2 MAIN/SURGERY ADDITIONS ALTERATIONS REQUIREMENTS D Clamps with positive grip or threaded fasteners may be used to attach to steel beam or girder webs. No "C" clamps are permitted. 1.9 CERTIFICATION OF CONNECTION DESIGN A. All design data and shop drawings shall be submitted for approval by the Architect before the equipment anchorage is fabricated or installed. Allow 4 weeks from time of submittal of design data and shop drawings for review The following information must be included in the design data and shop drawings. 1 Exact dimension and intended locations of each unit 2. Verification and location of weight (e.g. plan and height location of the center of gravity) 3 Scale drawings showing base details with original intended connection system 1.10 FIELD TEST A. A calibrated torque wrench shall be used to field test the installation of selected wedge anchorage. The wrench shall be calibrated by a licensed testing laboratory through tensile tests on the wedge- anchors. In the field verification test, the wedge anchors shall be torque tested to 1/2 the ultimate pull -out capacity B Fifty percent of the wedge- anchors shall be field tested if their design tensile load is more than 250 pounds. If the design tensile load is 250 pounds or less, 10 percent of the anchorages shall be field- tested. C. One percent of the wedge- anchors shall be field- tested for withdrawal at 1 1/2 times the design loadings. PART 2 PRODUCTS (NOT USED PART 3 EXECUTION (NOT USED 0 1997 Mahlon Nordfors McKinley Gordon END OF SECTION 01064 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 APPLICABLE CODES AND ORDINANCES A. Uniform Building Code, latest edition with Washington State Amendments B Uniform Mechanical Code, latest edition C. Uniform Fire Code, latest edition D Life Safety Code, NFPA 101 latest edition E. Uniform Plumbing Code, latest edition F National Electrical Code, latest edition with Washington State Amendments G Washington State Requirements for Barrier Free Standards, WAC 51 -20 latest edition H. Washington State Rules and Regulations for Hospital Construction, WAC 246 -318, latest edition I. State Environmental Protection Act J State Fire Marshal Requirements K. WAC 212 14 State Fire Mann Code L. City of Port Angeles Zoning Codes and Ordinances PART 2 BUILDING CODE REOUIREMENTS SECTION 01065 PAGE 1 CODE AND PERMIT REQUIREMENTS 2.1 REFERENCED CODE A. The Uniform Building Code, latest edition with Washington State Amendments 2.2 PROJECT CLASSIFICATION A. Seismic Zone: No. 3 B. Fire Zone: N/A C Occupancy Groups: I -1 D Construction Type: Type 1 FR E. Building Floor Area 1 Area of Remodeling: 24 700 square feet 2. Area of Additions: 8,100 square feet MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS F Fire Protection. Building is fully sprinklered. 0 1997 Mahl= Nordfors McKinley Gordon SECTION 01065 PAGE 2 CODE AND PERMIT REQUIREMENTS PART 3 ENERGY CODE REOUIREMENTS 3.1 GOVERNING CODE A. Washington State Energy Code, WAC 51 11, latest edition with all updates 3.2 PROJECT CLASSIFICATION AND ANALYSIS A. Value of alteration does not exceed 60 percent of the replacement value of the existing building. PART 4 PERMITS AND FEES 4.1 GENERAL A. Comply with Section 00510 Form of Agreement. B Owner shall pay for permit review fees and obtain and pay for the Port Angeles building permit. The Contractor shall obtain and pay for all additional permits, approvals, licenses, fees, bonds, and inspections necessary for the proper execution and completion of the Work. Any drawings, received from governing agencies, which are obtained by the Contractor and have corrective notes attached or on such drawings shall be reviewed by the Contractor prior to construction. Notify Architect of any corrective notes prior to doing the Work. C Contractor shall coordinate and obtain all Certification for Owner's occupancy and use of this project or portions of this Work. END OF SECTION 01065 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 USE OF STANDARDS A. Not all organizations listed below are referenced in the Contract Documents. This list is provided to help the Contractor locate referenced standards, and every effort has been made to provide accurate information. The Contractor is responsible for adherence to all standards referenced in the Contract Documents whether or not they are included in this section. 1.3 INDUSTRY STANDARDS SECTION 01091 PAGE 1 REFERENCE STANDARDS A. Applicability of Standards: Except where the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents. Such standards are made a part of the Contract Documents by reference. Individual sections indicate which codes and standards the Contractor must keep available at the project site for reference. B Publication Dates: Where the date of issue of a reference standard is not specified, comply with the standard in effect as of date of Contract Documents. C. Updated Standards: At the request of the Architect, Contractor, or authority having jurisdiction, submit a change order proposal where an applicable code or standard has been revised and reissued after the date of the Contract Documents and before performance of work affected. The Architect will decide whether to issue a change order to proceed with the updated standard. D Conflicting Requirements 1 Where compliance with two or more standards is specified and they establish different or conflicting requirements for minimum quantities or quality levels, the most stringent requirements will be enforced unless the Contract Documents indicate otherwise. Refer requirements that are different but apparently equal, and uncertainties as to which quality level is more stringent to the Architect for a decision before proceeding. 2. In every instance, the quantity or quality level shown or specified shall be the minimum to be provided or performed. The actual installation may comply exactly within specified tolerances, with the minimum quantity or quality specified, or it may exceed that minimum within reasonable limits. In complying with these requirements, indicated numeric values are minimum or maximum values, as noted, or appropriate for the context of the requirements. Refer instances of uncertainty to the Architect for a decision before proceeding. E. Copies of Standards 1 Each entity engaged in construction on the project is required to be familiar with industry standards applicable to that entity's construction activity Copies of applicable standards are not bound with the Contract Documents. 2. Where copies of standards are needed for performance of a required construction activity the Contractor shall obtain copies directly from the publication source. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS F Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. The following acronyms or abbreviations as referenced in Contract Documents are defined to mean the associated names. Names and addresses are subject to change and are believed to be, but are not ensured to be, accurate and up to date as of date of Contract Documents. 1.4 Lt ST OF STANDARDS AA Aluminum Association 900 19th Street NW Suite 300 Washington, D C. 20006 (202) 862-5100 DAF-45 Designation System for Aluminum Finishes AAMA American Architectural Manufacturers' Association 2700 River Road, Suite 118, Des Plains, Illinois 60018 (312) 699 -7310 AASHTO American Association of State Highway and Transportation Officials 444 North Capitol Street, Suite 225 Washington, D C. 20001 (202) 624-5800 AATCC American Association of Textile Chemists and Colorists P 0 Box 12215 Research Triangle Park, North Carolina 27709 (919) 549-8141 ACI American Concrete Institute P 0 Box 19150 Detroit, Michigan 48219 (313) 532 2600 214 AGC AHA AI Recommended Practice for Evaluation of Strength Test Results of Concrete 301 84(88) Specifications for Structural Concrete for Buildings 304 Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete 315 Manual of Standard Practice for Detailing Reinforced Concrete Structures 318 Building Code Requirements for Reinforced Concrete 506R Recommended Practice for Shotcreting 506.2 Materials, Proportioning, and Application of Shotcrete Associated General Contractors of America 1200 Westlake North, Seattle, Washington 98109 (206) 284 -0061 American Hardboard Association 520 N. Hicks Road, Palatine, Illinois 60067 (312) 934 -8800 Asphalt Institute Asphalt Institute Building, College Park, Maryland 20740 SECTION 01091 PAGE 2 REFERENCE STANDARDS MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 3 REFERENCE STANDARDS (301) 277 -4258 AIA American Institute of Architects 1735 New'York Avenue Northwest, Washington, D C. 20006 (202) 626-7300 )USC American Institute of Steel Construction 400 North Michigan Avenue, 8th Floor, Chicago, Illinois 60611 (312) 670 -2400 AISI American Iron and Steel Institute 1133 Fifteenth Street NW Washington, D C. 20036 (202) 452 -7100 Specification for Design of Cold- Formed Steel Structural Members ALI Associated Laboratories 641 S. Vermont Street, Palatine, Illinois 60067 (312) 358 -7400 ALSC American Lumber Standards Committee P 0 Box 210 Germantown, Maryland 20874 (301) 972 -1700 AMCA Air Movement and Control Association 30 W University Drive, Arlington Heights, Illinois 60004 (312) 394 -0150 ANSI American National Standards Institute 1430 Broadway New York, New York 10018 (212) 354 -3300 A10 Series Safety Requirements for Construction and Demolition APA American Plywood Association P 0 Box 11700, Tacoma, Washington 98411 (206) 565 -6600 APWA American Public Works Association, Washington Chapter Standard Specifications for Municipal Public Works Construction ASHRAE American Society of Heating, Refrigerating, and Air Conditioning Engineers 1791 Tullie Circle NE, Atlanta, Georgia 30329 (404) 636-8400 Handbook, Fundamentals (1981 Errata) ASM Architectural Specification Manual ASME American Society of Mechanical Engineers 345 East 47th Street, New York, New York 10017 (212) 705 -7722 MAHLIJM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS Elevator Code ASPE American Society of Plumbing Engineers 3617 Thousand Oaks Boulevard, Suite 210 Westlake, California 91362 (805) 495-7120 ASTM American Society for Testing and Materials 1916 Race Street, Philadelphia, Pennsylvania 19103 (215) 299 -5400 Standards in Building Codes: A36 Standard Specification for Structural Steel A53 Pipe, Steel, Black and Hot Dipped, Zinc Coated Welded and Seamless A82 Steel Wire, Plain, for Concrete Reinforcement Al20 Pipe, Steel, "Black and Hot Dipped Zinc Coated (Galvanized) Welded and Seamless, for Ordinary Uses Al23 Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products A153 Zinc Coating (Hot -Dip) on Iron and Steel Hardware A167 Stainless and Heat Resisting Chromium- Nickel Steel Plate, Sheet, and Strip A185 Steel Welded Wie Fabric, Plain, for Concrete Reinforcement A193/A193M Alloy -Steel and Stainless Steel Bolting Materials for High Temperature Service Stainless Steel and Heat- Resisting Steel Bars and Shapes Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength Seamless and Welded Austenitic Stainless Steel Pipes Steel Sheet, Zinc Coated (Galvanized) by the Hot -Dip Process for Roofing and Siding Steel, Sheet, Carbon, Cold Rolled, Commercial Quality Steel Sheet, Zinc Coated (Galvanized) by the Hot -Dip Process, Structural (Physical) Quality A500 Cold- Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes A276 A307 A312/A312M A361 A366 A446/A446M A501 A525 A526/A526M A527/A527M A554 SECTION 01091 PAGE 4 REFERENCE STANDARDS Hot Formed Welded and Seamless Carbon Steel Structural Tubing General Requirements for Steel Sheet, Zinc Coated (Galvanized) by the Hot -Dip Process Steel Sheet, Zinc Coated (Galvanized) by the Hot-Dip Process, Commerical Quality Steel Sheet, Zinc Coated (Galvanized) by the Hot -Dip Process, Lock Forming Quality Welded Stainless Steel Mechanical Tubing MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS A563 A569/A569M A570/A570M A611 A615 A775/775M A780 A786/A786M B32 B209 B211 B221 SECTION 01091 PAGE 5 REFERENCE STANDARDS Carbon and Alloy Steel Nuts Steel, Carbon (0 15 Maximum, Percent), Hot Rolled Sheet and Strip Commercial Quality Steel, Sheet and Strip, Carbon, Hot Rolled, Structural Quality Steel, Sheet, Carbon, Cold Rolled, Structural Quality Deformed and Plain Billet -Steel Bars for Concrete Reinforcement Epoxy Coated Reinforcing Steel Bars Standard Practice for Repair of Damaged Hot -Dip Galvanized Coatings Rolled Steel Floor Plates Solder Metal Aluminum and Aluminum -Alloy Sheet and Plate Aluminum and Aluminum -Alloy Bar Rod, and Wire Aluminum and Aluminum -Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes B316 Aluminum and Aluminum -Alloy Rivet and Cold- Heading Wire and Rods B429 Aluminum -Alloy Extruded Structural Pipe and Tube C33 Concrete Aggregates C36 Gypsum Wallboard C42 Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete C94 Ready -Mix Concrete C143 Method of Test of Slump of Portland Cement Concrete C150 Portland Cement C260 Air- Entraining Admixtures for Concrete C332 Lightweight Aggregates for Insulating Concrete C495 Compressive Strength of Lightweight Insulating Concrete C513 Securing, Preparing, and Testing Specimens from Hardened Lightweight Insulating Concrete for Compressive Strength C518 Standard Test Method for Steady -State Heat Flux Measurements and Thermal Transmission Properties by Means of the Heat Flow Meter Appartus C578 Preformed, Cellular Polystyrene Thermal Insulation C612 Mineral Fiber Block and Board Thermal Insulation C665 Mineral -Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing D146 Methods of Sampling and Testing Bitumen Saturated Felts and Fabrics Used in Roofing and Waterproofing D412 Standard Test Methods for Rubber Properties in Tension MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 6 REFERENCE STANDARDS D573 Standard Test Method for Rubber Deterioration in an Air Oven D624 Test Method for Rubber Property—Tear Resistance D746 Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact D882 Test Methods for Tensile Properties of Thin Plastic Sheeting D1149 Standard Test Method for Rubber Deterioration Surface Ozone Cracking in a Chamber D1751 Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) D1752 Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction D1938 Test Method for Tear Propagation Resistance of Elastic Film and Thin Sheeting by a Single -Tear Method D2626 Specification for Asphalt- Saturated and Coated Organic Felt Base Sheet Used in Roofing D4637 Vulcanized Rubber Sheet Used in Single -Ply Roof Membrane E84 Standard Test Method for Surface Burning Characteristics of Building Material E119 Standard Test Methods for Fire Tests of Building Construction and Materials E136 Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C E605 Standard Test Methods for Thickness and Desnity of Sprayed Fire Resistive Material Applied to Structural Members E736 Standard Test Method for CohesionlAdehsion of Sprayed Fire Resistive Materials Applied to Structural Members AWI Architectural Woodwork Institute 2310 S. Walter Reed Drive, Arlington, Virginia 22206 (703) 671-9100 Architectural Woodwork Quality Standards, Guide Specifications and Quality Certification Program (referred to in contract documents as "AWI quality standards AWPA American Wood Preservers' Association P 0' Box 849 Stevensville, Maryland 21666 (301) 643-4163 AWPB American Wood Preservers' Bureau P 0 Box 5283 Springfield, Virginia 22150 (703) 339 -6660 AWPI American Wood Preservers' Institute 1651 Old Meadow Road, McLean, Virginia 22101 MAHLUM NORDFORS MCK INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 7 REFERENCE STANDARDS AWS American Welding Society P 0 Box 351040 550 LeJeune Road Northwest, Miami, Florida 33135 (305) 443 -9353 D1 1 Structural Welding Code —Steel D1.2 Structural Welding Code— D1.3 Structural Welding Code -Sheet Steel D1 4 Structural Welding Code Reinforcing Steel AWWA American Water Works Association 6666 W Quincy Avenue, Denver, Colorado 80235 (303) 794 -7711 BANC Brick Association of North Carolina P 0 Box 13290 Greensboro, North Carolina 27415 (919) 273 -5566 BHMA Builders' Hardware Manufacturers Association 60 East 42nd Street, Room 511, New York, New York 10165 (212) 682-8142 CRSI Concrete Reinforcing Steel Institute 933 Plum Grove Road, Schaumburg, Illinois 60195 (312) 490-1700 MSP 1 Manual of Standard Practice Placing Reinforcing Bars Bar Support Specifications CSI The Construction Specifications Institute 601 Madison Street, Alexandria, Virginia 22314 (703) 684 -0300 CTI Ceramic Tile Institute of America 700 North Virgil Avenue, Los Angeles, California 90029 (213) 660 -1911 FGMA Flat Glass Marketing Association White Lakes Professional Building, 3310 West Harrison, Topeka, Kansas 66611 (913) 266 -7013 Glazing Manual Sealant Manual FM Factory Mutual Engineering and Research 1151 Boston Providence Turnpike, Norwood, Massachusetts 02062 (617) 762 -4300 FMS 1 -28 Insulated Steel Deck MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 8 REFERENCE STANDARDS FMS 1-49 Perimeter Flashing FMS P7825 Approval Guide GA Gypsum Association 1603 Orrington Avenue, Evanston, Illinois 60201 (312) 491 -1744 GTA Glass Tempering Association 66 -9 -20 Specification for Ceramic Enameled Spandrel Glass Fully Tempered or Heat Strengthened IEEE Institute of Electrical and Electronic Engineers 345 East 47th Street, New York, New York 10017 (212) 705 -7900 IGCC Insulating Glass Certification Council Route 11, Industrial Park, Cortland, New York 13045 (607) 753 -6711 MLA Metal Lath Association 221 North LaSalle Street, Chicago, Illinois 60601 ML /SFA Metal Lath/Steel Framing Association 600 South Federal Street, Suite 400 Chicago, Illinois 60605 (312) 922 -6222 Specification for Metal Lathing and Furring NAAMM National Association of Architectural Metal Manufacturers 600 S. Federal Street, Suite 400 Chicago, Illinois 60601 (312) 922 -6222 MBG 531 Metal Bar Grating Manual Metal Finishes Manual NBS National Bureau of Standards Washington, D C. 20234 NCMA National Concrete Masonry Association P 0 Box 781, Herndon, Virginia 22070 (301) 435 -4900 Tek Bulletin No. 45 NCRPM National Council on Radiation Protection and Measurement 7910 Woodmont Avenue, Suite 1016, Bethesda, Maryland 20814 (301) 657 -2652 NEC National Electric Code (from NFPA) NECA National Electrical Contractors Association 7315 Wisconsin Avenue, Bethesda, Maryland 20814 (301) 657 3110 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 9 REFERENCE STANDARDS NJG-6 Temporary Job Utilities and Services NEII National Elevator Industry Inc. 630 Third Avenue, New York, New York 10016 (212) 986-1545 Minimum Passenger Elevator Requirements for the Handicapped NEMA National Electrical Manufacturer's Association 2101 L Street NW Suite 300 Washington, D C. 20037 (202) 457 -8700 0 NFPA National Fire Protection Association Batterymarch Park, Quincy Massachusetts 02269 (617) 770 -3000 80 Standard for Fire Doors and Windows 241 Building Construction and Demolition Options 252 Standard Methods of Fire Tests of Door Assemblies NHLA National Hardwood Lumber Association P 0 Box 34518, Memphis, Tennessee 38184 (901) 377-1818 NTMA National Terrazzo and Mosaic Association 3166 Des Plaines Avenue, Suite 132, Des Plaines, Illinois 60018 (312) 635 -7744 NWWDA National Wood Window and Door Association (formerly NWMA) 1400 E. Touhy Avenue #G54 Des Plaines, Illinois 60018 (312) 299 -5200 I.S. 1 Industry Standard for Wood Flush Doors PCI Prestressed Concrete Institute 175 W Jackson Boulevard, Chicago, Illinois 60604 (312) 786 -0300 MNL 116 Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products MNL 117 Manual for Quality Control for Plants and Production of Architectural Precast Concrete Products MNL 127 Recommended Practice for Erection of Precast Concrete PDCA Painting and Decorating Contractors of America 614 Industry Drive, Tukwila, Washington 98188 (206) 364 -5165 Architectural Specification Manual SAMA Scientific Apparatus Makers Association 1101 Sixteenth Street NW Washington, D C. 20036 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 10 REFERENCE STANDARDS (202) 223-1360 SDI Steel Door Institute do A. P Wherry and Associates, Inc. 712 Lakewood Center N, 14600 Detroit Avenue, Cleveland, Ohio 44107 (216) 226 -7700 105 Recommended Erection Instructions for Steel Frames SGCC Safety Glazing Certification Council 41 Route 11, Industrial Park, Cortland, New York 13045 (607) 753 -6711 SJI Steel Joist Institute 1205 48th Street North, Suite A, Myrtle Beach, South Carolina 29577 (803) 449-0487 SMACNA Sheet Metal and Air Conditioning Contractors National Association P 0 Box 70, Merrifield, Virginia 22116 (703) 790-9890 Architectural Sheet Metal Manual SSPC Steel Structures Painting Council 4400 Fifth Avenue, Pittsburgh, Pennsylvania 15213 (412) 268 -3327 PA 1 Shop, Field, and Maintenance Painting Paint 12 Cold- Applied Asphalt Mastic (Extra Thick Film) Paint 20 Zinc -Rich Primers (Type I, "Inorganic," and Type II, 'Organic SP 1 Solvent Cleaning SP 3 Power Tool Cleaning SP 5 White Metal Blast Cleaning SP 6 Commercial Blast Cleaning SP 8 Pickling SP 10 Near -White Blast Cleaning Sweet's Sweet's Catalog File Sweet's Division McGraw -Hill Information Systems Company Attn. Direct Marketing Dept. 20th Floor 1221 Avenue of the Americas, New York, New York 10124 (800) 521-2737 TCA Tile Council of America, Inc. P 0 Box 326, Princeton, New Jersey 08542 (609) 921 7050 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 11 REFERENCE STANDARDS UBC Uniform Building Code International Conference of Building Officials 5360 Workman Mill Road, Whittier California 90601 UL Underwriters' Laboratories, Inc. 333 Pfingsten Road, Northbrook, Illinois 60062 (312) 272 -8800 Building Materials Directory The Recognized Component Directory Fire Resistance Directory WABO Washington Association of Building Officials WCLIB West Coast Lumber Inspection Bureau P 0 Box 23145 Portland, Oregon 97223 (503) 639 -0651 WMMP Wood Molding and Millwork Producers WM4 General Requirements For Wood Molding WWPA Western Wood Products Association 522 SW 5th Avenue, Yeon Building, Portland, Oregon 97204 -2122 (503) 224 -3930 1.5 FEDERAL GOVERNMENT AGENCIES CE Corps of Engineers (U.S. Department of the Army) Chief of Engineers Referral Washington, D C. 20314 (202) 272 -0660 CRD C621 Specification for Nonshrink Grout CFR Code of Federal Regulations N Capitol Street (between G and H Streets NW) Washington, D C. 20402 (202) 783 -3238 (available from the Government Printing Office) (material is usually first published in the Federal Register) 16 CFR Part 1201 29 CFR 1926 Asbestos, Tremolite, Anthophyllite, and Actinolite 40 CFR 763 Interim Method of the Detemrination of Asbestos in Bulk Insulation Samples CS Commercial Standard (U S. Department of Commerce) Government Printing Office, Washington, D C. 20402 MAHLUM NORDFORS McKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01091 PAGE 12 REFERENCE STANDARDS (202) 377 -2000 DOD Department of Defense P- 21035A Paint, High Zinc Dust Content, Galvanizing Repair (Metric) (Navy) DOT Department of Transportation 400 Seventh Street SW Washington, D C. 20590 (202) 366 -4000 EPA Environmental Protection Agency 401 M Street SW Washington, D C. 20460 (202) 382 2090 FS Federal Specification (from GSA) Specifications Unit (WFSIS) 7th and D Streets SW Washington, D C. 20406 (202) 472 -2205 or (202) 472 2140 FF -B -561 C Bolds (Screw), Lag FF -S -325 Shield, Expansion; Nail Expasnion; and Nail, Drive Screw (Devices, Anchoring, Masonry) FF -W -84A Washers, Lock (Spring) FF W -92B Washer, Flat (Plain) HH -I 1972/1 Insulation Board, thermal, Polyurethane or Polyisocyanurate, Faced with Aluminum Foil on Both Sides of the Foam HH- I -558B Insulation, Blocks, Boards, Blankets, Felts, Seeving (Pipe and Tube Covering), Thermal (Mineral Fiber Industrial Type) TT- C-494B Coating Compound, Bituminous, Solvent Type, Acid Resistant TT- P-645A Primer Paint, Zinc Chromate, Alkyd Type GSA General Services Administration F Street and 18th Street NW Washington, D C. 20405 (202) 472-1082 MIL Military Standardization Documents (U.S. Department of Defense) Naval Publications and Forms Center 5801 Tabor Avenue, Philadelphia, Pennsylvania 19120 MIL- M- 17194D Metal, Expanded, Steel MIL- M- 17999C Metal, Expanded, Aluminum OSHA Occupational Safety and Health Administration (U S. Department of Labor) Government Printing Office MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PS 4 0 1997 Mahhun Nordfors McKinley Gordon Washington, D C. 20402 (202) 523 -6091 29 CFR Part 1910 Product Standard of NBS (U S. Department of Commerce) Government Printing Office Washington, D C. 20402 (202) 783-3238 SECTION 01091 PAGE 13 REFERENCE STANDARDS END OF SECTION 01091 1 1 1 1 1 1 1 1 i f 1 1 MAHLUM NORDFORS McKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified this section. R B. Definitions and use of the contract documents shall be per Section 00700 General Conditions, and as follows. In case of conflict, the General Conditions shall take precedence. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. This sections includes the following: 1 Explanation of contract documents 2. Definitions 3 Abbreviations 4 Symbols 5 Keynotes 1.4 BIDDER AND CONTRACTOR RESPONSIBILITY SECTION 01095 PAGE 1 EXPLANATIONS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS A. Bidders and Contractors are responsible for providing subbidders and subcontractors with all contract documents necessary to achieve accurate completion of the work. PART 2 EXPLANATIONS 2.1 PURPOSE A. The contract documents collect into a single organization system all bid, contract, and technical documents related to project construction in section format. 2.2 SPECIFICATION CONTENT A. Language: This specification uses certain conventions in the use of language and the intended meaning of certain terms, words, and phrases when used in particular situations or circumstances. These conventions are explained as follows: 1 Wording of the contract documents is abbreviated or streamlined and frequently includes incomplete sentences. 2. "Shall," "the Contractor shall," "shall be," and similar words and phrases are hereby defined to have mandatory compulsory meaning. 3 These specifications are written in imperative and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. B Assignment of Specialists 1 The specification requires that certain specific construction activities shall be performed by specialists who are recognized experts in the operations to be performed. The specialists must be engaged for those activities, and assignments are requirements over MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.3 DESCRIPTION OF DOCUMENTS B. Volume 1 Project Drawings 1 Division A. Architectural Drawings 2. Division M. Mechanical Drawings 3 Division E. Electrical Drawings SECTION 01095 PAGE 2 EXPLANATIONS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS which the Contractor has no choice or option. Nevertheless, the ultimate responsibility for fulfilling contract requirements remains with the Contractor 2. This requirement shall not be interpreted to conflict with enforcement of building codes and similar regulations governing the work. It is also not intended to interfere with local trade union jurisdictional settlements and similar conventions. 3 Use of titles such as "carpentry" is not intended to imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter It also does not imply that requirements specified apply exclusively to tradespersons of the corresponding generic name. 4 The term "installer" shall be used to refer to all specialists. A. Volume 1 Project Manual 1 Division 0• Bidding requirements, contract forms, and conditions of the contract 2. Division 1 General requirements 3 Divisions 2 through 14 Architectural technical specifications 4 Division 15 Mechanical technical specifications 5 Division 16 Electrical technical specifications C. Size and Color 1 Project Manual Volume 1 is prepared in 8- 1/2 -by -11 -inch format and bound. Divisions 0 and 1 are copied on blue paper, Divisions 2 through 16 on white paper 2 Project Drawings Volume 2 is in large drawing sheet format and bound. Drawings are reproduced as blueline or blackline on white paper D Page Number Section page number are consecutive only for each section as noted in page heading. Section 00003 Table of Contents, lists each section and its number of pages. E. Section Format 1 The technical specifications are organized per the Construction Specifications Institute (CSI) MASTERFORMAT (1988 Edition). 2. The use of the section format of MASTERFORMAT has been extended to provide a similar format for all bid and contract documents, including drawings. 3 Basic groups of documents and information are organized into divisions, sections, or paragraphs. 4 References to and within the contract documents shall state item section number and name (and paragraph number if required). This paragraph is referred to as Paragraph 2.1.H.4 (or Paragraph 2.1.H to refer to all four paragraphs), Section 01095 Explanations, Definitions, Abbreviations, Symbols. 1 1 1 1 1 1 1 1 1 1 i 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 01095 PAGE 3 EXPLANATIONS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS F Reference System 1 References may be general (broadscope) or specific (narrowscope). Broadscope shall be meant to include derivative sections (example: Section 01300, Submittals, also includes Section 01310, Progress Schedule). Numbering of sections is for identification only and may not be consecutive. Contractor shall check his copies of the contract documents with Section 00003 Table of Contents, to verify that they are complete. Notify Architect of incomplete copies. 3 Section number references used on drawings serve to identify a material or detail with its applicable specification section. Other materials not so identified shall be provided by the respective trades in the customary manner 4 Section number and name shall be used to identify the subject of any correspondence with its related specification section. PART 3 DEFINITIONS 3.1 GENERAL A. A substantial amount of the contract document language constitutes specific definitions for terms found in other contract documents. Certain terms used more generally throughout the contract documents are defined as follows. 3.2 TERMINOLOGY A. Addenda: Additions made to the contract documents during the bidding period. Used to revise, delete, or add to any of the bidding requirements or contract documents. 1 Approve: Where used in conjunction with the Architect's response or submittals, requests, applications, inquiries, reports, and claims by the Contractor the meaning will be held to the limitations of the Architect's responsibilities and duties as specified in Section 00700 General Conditions. In no case will "approval" by the Architect be interpreted as an assurance to the Contractor that the requirements of the contract documents have been fulfilled. 2. As -built Drawings: Set of reproducible drawings prepared by the Contractor to indicate construction changes per Section 01700, Contract Closeout. 3 Bidding Requirements: Used to attract bidders and explain the procedures they are to follow in preparing and submitting their bids. 4 Construction Documents: All of the written and graphic documents prepared or assembled by the Architect for communicating the design and administering the construction contract. They include the following categories: bidding requirements, contract forms, conditions of the contract, specifications, drawings, addenda, and contract modifications. This term is interchangeable with "contract documents. 5 Contract Documents: The legally enforceable requirements which become part of the contract when the agreement is signed. See "construction documents" above. 6 Contract Modifications: After the agreement has been signed, any additions, deletions, or modifications of the work to be done are accomplished by change order or supplemental instructions. 7 Directed, Requested, etc. Where not otherwise explained, terms such as directed, "requested," 'authorized, "selected, "approved, "permitted," "required, and "accepted' mean "directed by the Architect, "requested by the Architect," etc. However MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01095 PAGE 4 EXPLANATIONS, DEFINTTIONS, ABBREVIATIONS AND SYMBOLS no such implied meaning will be interpreted to extend the Architect's responsibility into the Contractor's area of construction supervision. 8. Drawings: Graphic representation of the work to be done. Also referred to as project, design, or construction drawings. 9 Furnish: Except as otherwise defined in greater detail, the term "furnish is used to mean "supply and deliver to the project site, ready for unpacking, assembly and installation." 10 General Requirements: Synonymous with "Division 1 sections." 11 Guarantee: A separate contract by a third party analogous to a surety bond, covering responsibility in case the principal fails to perform. Contractor provides a guarantee for materials and a warranty for field workmanship. "Guarantee" and "warranty" are used interchangeably in these specifications as they relate to Section 00700 General Conditions.) 12. Indicated: A cross reference to details, notes, or schedules on the drawings, other paragraphs or schedules in the specifications, and similar means of recording requirements in the contract documents. 13 Install: To describe operations at project site, including the actual unloading, unpacking, assembly erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations. 14 Installer The person or entity engaged by the Contractor or his subcontractor or sub subcontractor for the performance of a particular unit of work at the project site, including installations, erections, application, and similar required operations. It is a general requirement that installers be recognized experts in the work they are engaged to perform. 15 Project Site: The space available to the Contractor for the performance of the work, either exclusively or in conjunction with others performing other work as part of the project. The extent of the project site is shown on the drawings and may or may not be identical with the description of the land upon which the project is to be built. 16 Provide: Except to the extent further defined, means 'to furnish and install, complete and ready for the intended use." 17 Record Drawings: Set of prints kept on site and updated by the Contractor to indicate construction changes per Section 01720 Project Record Documents. 18 Shop Drawings: Drawings, schedules, and other information prepared by the Contractor to describe fabrication and installation of elements of the work. 19 Specifications: Define the qualitative requirements for products, materials, and workmanship upon which the contract is based. Consist of Divisions 1 through 16 20 Testing Laboratory. An independent entity engaged to perform specific inspections or tests of the work, either at the project site or elsewhere, and to report and (if required) interpret the results of those inspections or tests. 21 Warranty An assurance by the principal that it will assume stipulated responsibilities for completed units. Manufacturer warrants its material. "Guarantee" and "warranty" are used interchangeably in these specifications as they relate to Section 00700 General Conditions.) 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON, OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 4 ABBREVIATIONS 4.1 STANDARD ABBREVIATIONS A. Following is a list of abbreviations commonly used in specifications and on drawings. 1. AD architectural detail 2. AS architectural schedule 3 EXG existing 4 FCIO furnished by contractor, installed by owner 5 FIC furnished and installed by contractor 6 FIO furnished and installed by owner 7 FOIC furnished by owner, installed by contractor 8. MISC miscellaneous 9 MC not in contract 10 OC on center 11 OPP opposite 12. R radius 13 SBC Seattle Building Code 14 SIM similar 15 TYP typical 16 UBC Uniform Building Code 4.2 SCHEDULES SECTION 01095 PAGE 5 EXPLANATIONS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS A. Refer to Volume 2, Project Drawings, for schedules and their applicable abbreviations. PART 5 SYMBOLS 5.1 GENERAL A. Refer to project drawings or details for symbols and special designations. 5.2 GRAPHIC SYMBOLS A. Where not otherwise noted, symbols are defined by Architectural Graphic Standards, published by John Wiley Sons, Inc. eighth edition. 5.3 MECHANICAL/ELECTRICAL DRAWINGS A. Graphic symbols used on mechanical and electrical drawings are generally aligned with symbols recommended by ASHRAE. Where appropriate, they are supplemented by more specific symbols recommended by technical associations including ASME, ASPE, IEEE, and similar organizations. Refer instances of uncertainty to the Architect for clarification before proceeding. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 01095 1 t 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON. SECTION 01121 PAGE 1 OLYMPIC MEMORIAL HOSPITAL HAZARDOUS MATERIALS 2 MAIN /SURGERY ADDITIONS ALTERATIONS PROCEDURES PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. a 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. The presence of hazardous materials, including but not limited to asbestos, and related materials or substances, have been identified or determined at the project site to the best of the Owner's ability through a Good Faith Inspection. B. A copy of the Owner's hazardous materials survey is attached to this section and shall be maintained on file with the Owner and available to the Contractor and the Director of the Department of Labor and Industries, or his designee. 1.4 OWNER RESPONSIBILITY A. The abatement of hazardous materials shall be the responsibility of the Owner B. Any questions that arise related to hazardous materials and their disturbance, disruption or abatement shall be referred to the Owner for resolution. C. The Owner shall bear the cost of hazardous materials abatement by a certified hazardous materials abatement contractor 1.5 CONTRACTOR RESPONSIBILITY A. If any hazardous materials abatement must be undertaken in the course of performing Contractor's work, Contractor shall discuss the timing of such abatement work with owner and plan for the same in Contractor's work schedule prior to commencing any work on the project. B Contractor shall not remove, disrupt or disturb any hazardous materials at any time. The Contractor shall have on site an employee who is certified for asbestos recognition during all phases of work. C. In the event that Contractor encounters any previously unidentified hazardous materials, the Contractor shall immediately suspend work and inform the Owner when materials suspected of being hazardous are encountered at the project site. D The Owner shall engage the services of a certified hazardous materials contractor to identify hazardous materials and perform hazardous materials abatement. E. The Contractor shall commence work only upon receiving a written clearance from the Owner 1.6 ARCHITECT RESPONSIBILITY A. The Architect will not be responsible for the content of the hazardous materials abatement documents nor for the work done thereunder MAHLUM NORDFORS MCKINLEY GORDON SECTION 01121 PAGE 2 OLYMPIC MEMORIAL HOSPITAL HAZARDOUS MATERIALS 2 MAIN /SURGERY ADDITIONS ALTERATIONS PROCEDURES B. The Architect will not be required to provide any service or render any opinions related to hazardous materials. PART 2 PRODUCTS Not used. PART 3- EXECUTION 3.1 GENERAL A. The Contractor shall submit a copy of their project weekly safety meeting which shall include in the agenda a discussion on handling of hazardous materials. B. The Contractor will suspend work immediately and notify the Owner if previously unidentified materials suspected of being hazardous are encountered at the project site. C. The Contractor shall perform initial demolition only to the extent required to expose undisturbed previously identified materials suspected of being hazardous per Section 02070 Selective Demolition. The Contractor will then cease work, notify the owner in writing that the contractor's forces have vacated the project site. D The Owner is responsible for engaging the services of certified and licensed independent hazardous materials abatement contractor and to secure all necessary permits from applicable agencies and remove hazardous materials. The Owner's abatement contractor shall enter the project site and abate the previously or subsequently identified materials suspected of being hazardous. E. The Contractor shall allow for the specified period of time identified in Section 01011 `Contract Time and Sequence' at each phase for the Owner's independent hazardous materials abatement contractor to complete their work, within the Contract Time Allotted. F The Contractor shall not resume work until receiving, in writing, clearance from the Owner that the abatement work has been completed. G. Neither the Contractor nor the Owner will be penalized by the other for delays in the project schedule due to work required for previously unidentified hazardous materials abatement. The specified contract construction time shall be adjusted to add the actual calendar days lost due to any additional abatement period. 0 1997 Mehlwn Nordfors McKinley Gordon END OF SECTION 01121 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. a 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION SECTION 01122 PAGE 1 HAZARDOUS MATERIALS REPORT A. The following AHERA Asbestos Survey was prepared for the Owner by Certified Industrial Hygiene Services, Inc. For the Contractor's convenience, the complete report is reproduced herein. B. The information included in the report shows records of the hazardous materials investigation. The Owner does not represent that the records show completely the existing conditions and does not guarantee any interpretation of these records or the correctness of any information shown on drawings relative to hazardous materials. C. Any oral statement or representation made by an officer, agent, or employee of the Owner with respect to the physical condition of the site of the work, the presence of hazardous materials, or hazardous material procedures shall not be binding upon the Owner 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 01122 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS s 0 1997 Mahlnm Nonlfors McKinley Gordon THE HAZARDOUS MATERIALS REPORT WILL BE ISSUED BY ADDENDUM TO ALL PLAN HOLDERS SECTION 01122 PAGE 2 HAZARDOUS MATERIALS REPORT END OF SECTION 01122 t 1 1 1 MAHLUM NORDFORS McKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. Attending or Conducting 1 General preconstruction conference 2. Subtrade preconstruction conferences 3 Progress payment meetings B Related Work Specified Elsewhere 1 Section 01026 Payment Procedures 2. Section 01500 Construction Facilities and Temporary Controls PART 2 PROJECT MEETINGS 2.1 GENERAL PRECONSTRUCTION CONFERENCE A. Attendance 1 Owner Architect, Contractor and his superintendent, major subcontractors, including the individuals responsible for scheduling, mechanical, and electrical work. B Agenda 1 The purpose is to discuss all matters affecting progress and administration of the work. The Architect has the agenda on file which is available upon request. C Responsibility 1 Conference will be called by Architect at mutually agreeable time and place prior to issuing the Notice to Proceed. 2.2 SUBTRADE PRECONSTRUCTION (PREINSTALLATION) CONFERENCES A. Attendance SECTION 01200 PAGE 1 PROJECT MEETINGS 1 Meetings shall be held prior to start of work of certain subtrades per Divisions 2 through 16 2. Attendance shall include Contractor and representative(s) of subtrade(s) as required. The Architect and Owner shall be notified at least 48 hours in advance for their optional attendance. B. Agenda 1 Purpose of these meetings is to ensure full understanding of necessary relation to the work, safety precautions, and other contract requirements of subject work. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Responsibility 1 Contractor shall arrange and conduct meetings at mutually agreeable time and place. Contractor shall record significant discussions and agreement and disagreements of each conference, along with the approved schedule. Distribute the record of the meeting to everyone concerned promptly including the Owner and Architect. Do not proceed if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of work and reconvene the conference at the earliest feasible date. 2.3 PROGRESS MEETINGS A. Attendance 1 Owner, Architect, and Contractor 2. Architect's consultants and Contractor's subcontractors shall attend when required. B Agenda 1 Agenda is attached to this section and shall be used by the Contractor All items requiring action will be assigned to the appropriate individual and carried forward to each subsequent meeting retaining the original meeting and item number The agenda is on disc and available to the Contractor upon request. C. Responsibility 1 Day of week and time shall be as agreed at general preconstruction conference. 2. Architect and Contractor shall determine in advance if consultant or subcontractor attendance is required. 3 Meeting minutes shall be by the Contractor and Faxed to all involved individuals within 2 working days of the meeting. 0 1997 Mahimn Nordfors McKinley Gordon SECTION 01200 PAGE 2 PROJECT MEETINGS END OF SECTION 01200 PROJECT Olympic Memorial Hospital PROJECT NO 96160.00 2 Main /Surgery Additions Alterations MEETING NO DATE. TIME PLACE ATTENDEES COPIES N O. /ITEM NO PROGRESS MEETING AGENDA DATE BY MEETING I FOLLOW UP ACTION DISCUSSION ITEMS Government Agency Concerns Contractor Questions Review Architect's Supplementary Instruction Review Change Order and Change Order Proposal Review Submittal Status Construction Progress and Schedule Review Site Utilization, Access, and Temporary Facilities Payment Application Review Additional Contractor Concerns Additional Owner Concerns Additional Architect /Engineer Concerns Safety REQUIRED BY Mahlum Nordfors McKinley Gordon 1997 Form 1068 8/97 MA H L U M NORDFORS Mc KIN LEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206 441 4151 206 441 0478 F MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A complete list of standards is located in Section 01091 Reference Standards. 1.3 DESCRIPTION A. General. Preparing and processing submittals as required by Section 00700 General Conditions, the specifications, and as follows. B Required Submittals 1 Schedule of values 2. Construction progress schedule 3 Schedule of submittals 4 List of proposed subcontractors 5 Material and product data 6 Shop drawings and samples 7 Record documents 8 Maintenance and operation manuals 9 Warranty manual 10 Miscellaneous submittals C. Related Requirements Specified Elsewhere 1 Substitutions, Section 01630 Product Options and Substitutions 2. Project closeout requirements, Section 01700, Contract Closeout 3 Particular submittal requirements, individual sections of Divisions 2 through 16 1.4 SUBMITTAL PROCEDURE SECTION 01300 PAGE 1 SUBMITTALS A. When applicable, each section of Divisions 2 through 16 will include submittal requirements specific to that section (i.e. shop drawings, samples, product data, etc.). The general submittal requirements listed in this section will apply to all sections whether specific requirements are listed or not. B Each copy of each submittal should have the following information on the cover on the first page of the submittal, or on a permanent label attached to the submittal, as applicable: 1 Project name 2. Submittal number correlated with the submittal schedule provided per 3 10.2 of the General Conditions 3 Date of submittal 4 Name of the Contractor 5 Name of the Architect MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS I. Copies in excess of the number requested will not be returned. 1.5 FORMAT 1.6 TIMING OF SUBMITTALS A. The Contractor's first payment request will not be processed prior to receipt of: 1 Schedule of Values 2. Construction Progress Schedule 3 Schedule of Submittals 4 List of Proposed Subcontractors SECTION 01300 PAGE 2 SUBMITTALS 6 Name and phone number of subcontractor supplier, and installer 7 Name of manufacturer 8 Number and title of applicable specification section 9 Drawing number and detail references, when applicable 10 Other necessary identifying information, such as stating the different parts of the submittal (i.e. product data, samples, etc.) and how many of each item are provided C. Contractor shall sign or initial each copy of each submittal to certify compliance with requirements of the contract documents or shall notify the Architect, in writing at time of submittal, of all deviations from requirements of contract documents. D Address to Architect. Copy and distribute as specified for each type of submittal (below). Include with each submittal completed Submittal Cover Sheet Transmittal (Form 1046 example at end of this section). E. Submittals to receive Architect's action marking should have blank space provided on cover first page, or label for action marking. F Package submittals required for each particular specification section together Incomplete submittals will generally be returned to the Contractor without review G. Architect to receive submittals no less than 15 working days in advance of required approval time to allow proper review by Architect or his consultants. Submittals requiring action in less than 15 working days are not timely submittals. H. Submittals will be accepted from the Contractor only Submittals received from other entities will be returned without action. A. Unless otherwise specified or impractical, use paper no larger than 8 -1/2 by 11 inches, except drawings to be size required, but folded to 8 -1/2 by 11 inches where possible. B Transmit each submittal at or before the time indicated on the approved schedule of submittals. C. Prepare and transmit each submittal requiring approval sufficiently in advance of scheduled performance of the work to which it relates to allow for adequate review and processing time, including time for resubmittal if necessary D Prepare and transmit each informational submittal prior to start of the work involved, unless the submittal is of a type which cannot be prepared until after completion of the work. Submit promptly 1 1 i 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 01300 PAGE 3 SUBMITTALS E. If processing time for a particular submittal will be critical to progress of the work, so advise the Architect on the submittal. F The Architect will notify the Contractor when a submittal is being delayed for coordination. G. No extension of time will be authorized because of the Contractor's failure to transmit Submittals sufficiently in advance of the work. 1.7 COORDINATION A. Coordinate preparation and processing of submittals with performance of the work. Coordinate each separate submittal with other submittals and related activities that require sequential performance. B Coordinate submittal of different units of interrelated work so that no submittal will be delayed by the Architect's need to review a related submittal. The Architect reserves the right to withhold action on any such submittal until the related submittals are received. C. Coordinate schedule so that casework shop drawings are not submitted for review during the same two week period as any other submittal. 1.8 REVIEW AND RETURN OF SUBMITTALS A. Architect shall review and mark with appropriate action per Section 00700 General Conditions. 1 No Exception Taken. Work covered by the submittal may proceed provided it complies with requirements of the contract documents. Accepted shall also mean "subject to plans and specifications, dimensions and quantities not guaranteed. 2 Note Markings, Confirm. Work covered by the submittal may proceed provided it complies both with notations and corrections on the submittal and with requirements of the contract documents. 3 Not Accepted, Resubmit: Do not proceed with work covered by the submittal. Revise the submittal or prepare a new submittal in accordance with notations made. Resubmit the submittal without delay B. Submittals will be returned to the Contractor by most economical mode. C Contractor shall perform resubmittals in the same manner as original submittals. Indicate all changes other than those requested by the Architect. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION 3.1 SCHEDULE OF VALUES A. Prepare per Section 01027 Schedule of Values. 3.2 CONSTRUCTION PROGRESS SCHEDULE A. Prepare per Section 01310, Progress Schedule. 3.3 SCHEDULE OF SUBMITTALS A. Title "Schedule of Submittals." MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS B. Prepare and submit for approval a schedule showing all submittals and their initial submittal dates required for coordination of the work. C. Organize the schedule by the applicable specification section number D Submit the schedule within thirty (30) days after commencement of the work. E. Revise and resubmit the schedule for approval when required to keep current. 3.4 LIST OF PROPOSED SUBCONTRACTORS A. Format SECTION 01300 PAGE 4 SUBMITTALS 1 Title "List of Proposed Subcontractors." 2. List items in order they occur in specification sections. 3 Each list item shall state specification section number(s) and name(s) of subcontract work and subcontractor's name. B Required Information 1 Section 00700, General Conditions, requires identification of subcontractors. This is hereby interpreted to mean those subcontractors who shall install or furnish and install work in the project. 2. If, with Architect's approval, identification of certain subcontractors is delayed, so indicate in list. Furnish prior to first progress payment application. C Distribution. Submit three copies to Architect. 3.5 MATERIAL AND PRODUCT DATA A. General 1 Purpose of these submittals is to establish the materials and products to be used in the work. 2. Submit to the Architect, shop drawings, samples, and maintenance and operation manuals for related submittal work. B Format 1 Provide with 'cover sheet" information per Paragraph 1 4.B. 2. Bind to allow removal or insertion of pages. Provide suitable protective cover 3 Present items in order they occur in specification sections. C. Required Information 1 Contractor's statement of approval and identification of any deviations from contract documents per Section 00700 General Conditions. Place on face or "cover sheet" of submittals. 2. Description of materials, products, or systems required by all sections of the specification. Provide sufficient technical information to establish conformance with specification via. a. Manufacturer's literature or other necessary descriptive materials, including installation instructions. b Contractor's letter that minor miscellaneous items (nails, bolts, etc.) shall conform to specified standards 1 1 t 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Distribution 3.6 SHOP DRAWINGS AND SAMPLES A. General B Format SECTION 01300 PAGE 5 SUBMITTALS c. Information requirements for mechanical and electrical items (refer to Divisions 15 and 16). 3 Where possible, submittal should include rough -in and dimension information to preclude need for further submittal per below 4 Indicate clearly for each item the need for selection by Architect of color, style, mounting, etc. Selections will be returned with approval. 5 Include recommendations for application and use. 6 Show special coordination requirements for the product. 1 Submit four copies to Architect for all structural, civil, mechanical, and electrical submittals: one each for consultant, Owner, and Architect and one for return to Contractor All architectural submittals require three copies. 2. Architect will forward approved copy of submittal to Contractor 1 Purpose of these submittals is to determine installation and erection requirements for components of the work. 2. Submit with product data, samples, test data, and installation or application procedures and other submittals as delineated for each section of the specifications. 3 Show all conditions and connections to other work on shop drawings. 4 Submittals under this part are not intended to duplicate those specified under Paragraph 3.5 above. 1 Provide with "cover sheet" information per Paragraph 1 4.B. 2. Submit one set of blueline or blackline prints of appropriate size and one sepia copy of drawings or two 8- 1 /2 -by -11 -inch or 11 -by -17 -inch copies, whichever applies. Provide one additional copy of all civil, structural, mechanical, and electrical shop drawings. Reviewed sepia will be to Contractor 3 Sample size (2 inches minimum) to be as necessary to display requested color, texture, pattern, or construction. Provide four samples total, one sample will be retained by the Architect and one sample is to be kept at the jobsite at all times. C. Required Information 1 Submittal information required per specifications for subject work. 2. Reference to work "by others" shall be assumed to mean "by Contractor" unless otherwise noted. 3 Samples to include accurate samples of all substrates and coverings, by same or other trades, as required to produce example of final result. D Distribution 1 Submit one copy and one sepia to Architect for each review 2. For work concerning Architect's consultant, submit all copies and sepias to Architect for distribution. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS B Format SECTION 01300 PAGE 6 SUBMITTALS 3 Architect will forward approved sepia of submittal to Contractor 4 Architect may return sepia or one copy of approved submittal requesting return of corrected sepia or copy Contractor will return one corrected copy each directly to Architect, Consultant, and Owner's representative. 5 Architect will return all copies and sepias of disapproved submittals for resubmittal. 3.7 RECORD DOCUMENTS A. Prepare per Section 01720, Project Record Documents. 3.8 MAINTENANCE AND OPERATION MANUALS A. General 1 Purpose is to provide Owner with record information necessary for his future operation and maintenance of the project. 2. Refer to Paragraph 3.5 above for related work. 3 Provide six separate manual sets: two each for architectural, mechanical, and electrical work. 1 Bind each manual in a three- ringed, heavy -duty vinyl covered hardboard binder 2. On cover imprint title "General (or 'Mechanical" or "Electrical Equipment Operation and Maintenance Manual" names of project, Owner, Architect (include name of appropriate consultant engineer on mechanical and electrical manuals); and year of substantial completion, include Contractor's name and date. On bound edge, imprint name of project and Owner year of substantial completion. 3 On bound edge, imprint name of project and owner and year of substantial completion. 4 Pages to be neat, clean sheets 8- 1 /2 -by -11 -inch maximum size or accordion foldouts to same size. 5 Items to be identified with tabbed dividers showing section name and number of appropriate specification sections. 6 Arrange dividers and items in order they occur in specifications. C. Required Information 1 Table of contents 2. Consecutive page number in lower right corner of each page 3 All information needed to operate and maintain systems and equipment provided in the project presented and arranged in a logical manner for efficient use by the Owner's operating personnel 4 Includes, but not limited to, the following: a. Equipment manufacturer, make, model number, size, etc. Include distributor, phone number etc. as required to obtain replacement parts. b. Equipment nameplate data of major items. c. Description of system configuration and operation, including component identification and interrelations. A master control schematic drawings(s) will normally be required for this purpose. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Distribution 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01300 PAGE 7 SUBMITTALS d. Dimensional and performance data for specific unit provided. Extraneous catalog data must be eliminated. e. Manufacturer's recommended cleaning methods and materials. f. Manufacturer's reconunended operating instructions as appropriate. g. Manufacturer's reconunended lubrication and servicing data. h. Complete parts list, including reordering information, recommended spares, and anticipated useful life (if appropriate). i. Emergency instructions. J• Inspection procedures. 5 Refer to Divisions 15 and 16 for further requirements for mechanical and electrical manuals. 1 Prior to binding, submit one preliminary copy to Architect for approval. Preliminary copy shall be complete, except include temporary cover showing intended layout for final cover and bound edge. 2. Upon approval of preliminary copy prepare and submit to Architect two final copies of each manual to be forwarded to Owner 3.9 WARRANTY MANUAL A. Prepare per Section 01745 Warranty Procedures. 3.10 MISCELLANEOUS SUBMITTALS A. Maintenance Instruction 1 Completely describe manufacturer's recommended maintenance methods, procedures, and materials. 2 Submit one copy to Owner in advance of Owner's use or maintenance of product or material to preclude incorrect action by Owner 3 Submit one copy in Maintenance and Operation Manual. B. Materials for Maintenance 1 Provide quantities specified in Divisions 2 through 16 2. Deliver to Owner as directed. 3 Colors, patterns, and textures shall match work installed and shall be taken from same run of stock. END OF SECTION 01300 t 1 1 C SUBMITTAL COVER SHEET PROJECT Olympic Memorial Hospital 2 Main /Surgery Additions Alterations SPECIFICATJON SECTION TO FROM SUBCONTRACTOR SUPPLIER. INSTALLER MANUFACTURER. Description of Submittals Mahlum Nordfors McKinley Gordon COPIES DWG NO REV /RET SUBMITTAL TYPE DATE. SUBMITTAL NO Contractors Comments: I have examined this submittal and certify compliance with requirements of the Contract Documents. By Date: Description of Deviation from Requirements: Architects Comments: No Exception Taken Rejected Submittal Review Note Markings See Attached By Date: T R A N S M I T T A L PROJECT NO 96160.00 PHONE. PHONE. PHONE. PHONE Response Required Confirm Resubmit Architect's review is for general conformance with the design content and Contract Documents. Markings or comments shall not be construed as relieving the Contractor from compliance with the project plans and specifications, nor departures therefrom. The Contractor remains responsible for details and accuracy for confirming and correlating all quantities and dimensions, for selecting fabrication processes, for techniques of assembly, and for performing the work in a safe manner Date Approvals Requested by Date Submittal Received Date Submittal Returned to Contractor Contractor Mahlum Nordfors McKinley Gordon 1997 Form 1046 9/97 MA H LU M NORDFORS Mc KIN LEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206 441 4151 206 441 0478 F 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIdNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. Work includes: 1 Construction progress schedule 2. Schedule updates and revisions B Related work specified elsewhere includes: 1 Section 01010 Summary of Work 2. Section 01011, Contract Time and Sequence 3 Section 01026, Payment Procedures 4 Section 01200 Project Meetings 5 Section 01300, Submittals 6 Section 01700 Contract Closeout 7 Divisions 2 through 16, Technical Specifications PART 2 PRODUCTS (NOT USED PART 3 EXECUTION 3.1 CONSTRUCTION PROGRESS SCHEDULE A. General SECTION 01310 PAGE 1 PROGRESS SCHEDULE 1 Prepare per Section 01300, Submittals, and Section 00700 General Conditions. B Format 1 Title "Construction Progress Schedule. 2. Date to be that of original submission with revision date noted for each subsequent update. 3 Use paper size and production method suitable for updating and reproduction throughout duration of project. C. Required Information 1 Submit, within seven (7) days after Notice to Proceed, a time- scaled critical path method (CPM) network schedule diagram of the project for the entire construction period. 2. Create, update, and revise all schedules and execute the plan described by the schedule. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3 Submit initial schedule to the Owner and Architect and review as appropriate for meeting the scheduling requirements of the contract. The construction schedule shall. a. Be an "activity- type" CPM schedule clearly identifying the activity and time required for the activity b. Be plotted to a calendar- day -based horizontal time scale divided into weekly increments. c. Clearly display the specific start and completion date of every activity in the schedule (basing the plotting of the CPM schedule on a time scaled calendar shown at the top of the schedule will fulfill the requirement) and the critical path of activities. d. Show a logical sequence of the work to be accomplished. e. Show the order and interdependence of the Contractor's planned activities. f. Have as many activities as practical broken down such that no individual CPM activity element is for a duration greater than 21 calendar days. Identify phases or major areas of construction of the CPM schedule by logically grouping activities and indicating phase or area in large print. h. Indicate any required actions of Owner or Architect affecting progress or completion date. i. Be updated as required to stay current with job progress and the relationship to the final completion date. Clearly display the precedence of submittal schedule activities, i.e. the nodal point on the construction schedule by which a particular submittal/review /fabrication and delivery must be accomplished. k. Display the phases and sub- phases of the project as described in 01011 Contract Time and Sequence clearly and the effects (if any) of the other scheduled projects that will occur simultaneously g. j• D Scheduling Update Requirements 1 This schedule shall be updated monthly SECTION 01310 PAGE 2 PROGRESS SCHEDULE E. Schedule Revision Requirements 1 When, in the opinion of the Owner with consultation from the Architect, it appears that the Contractor's work progress is generally not conforming to the representations of the schedule to such a degree as to significantly reduce the effectiveness of the schedule as a management tool, the Contractor shall revise the schedule. a. The revised schedule shall show actual as-built progress for all executed activities and shall show the scheduling of all future activities. b. The revised schedule shall be submitted to the Architect for review as appropriate for meeting the scheduling requirements of the contract. c. The Contractor will be allowed thirty (30) calendar days to prepare each schedule update. Delay beyond this 30-day period will be cause for withholding progress payments since the schedule of values for payments is based on the CPM schedule. F Distribution 1 Following initial submittal to and response by Architect, print and distribute progress schedule to Architect, Owner, principal subcontractors, suppliers or fabricators, and others with a need to know the schedule. Post copies in project meeting rooms and field MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS G. Procedure During Construction 1 The Contractor and Owner with the assistance of the Architect, shall analyze actual construction progress at each construction progress meeting. If, during the course of the work, changes are of such nature as to cause resequencing or rescheduling of events from that originally shown, the Contractor will submit updated and revised CPM reflecting the actual progress of the work. Should the Contractor fail to meet the scheduled dates shown, the Owner, through the Architect, may direct the Contractor to accelerate his efforts in order to complete the project within the time indicated on the latest approved schedule. Such acceleration costs shall be borne by the Contractor 3.2 THREE WEEK DETAIL CALENDAR A. General. In addition to the CPM schedule, provide a calendar in 8 -1/2 x 11 format showing the detailed activities of work scheduled for the impending three weeks. Include all significant milestones, utility shutdowns, and names and numbers of rooms in occupied areas that will be affected by work in the contract. 1 Update schedule weekly so that it always projects the next three weeks. 2. Issue the detail calendar weekly at the construction progress meeting, or no later than Wednesday of the week preceding the first week on the calendar Fax the calendar to the Architect, hospital administrator and the Owner's construction representative. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01310 PAGE 3 PROGRESS SCHEDULE office. Distribute and post subsequent updated issues to same entities when revisions are made—except, delete entities from distribution when they have completed assigned work and are no longer involved in performance of scheduled work. END OF SECTION 01310 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDmONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. General 1 Quality control work by Contractor as indicated 2. Inspections and testing by Owner's testing laboratory SECTION 01400 PAGE 1 QUALITY CONTROL B Requirements 1 Comply with Section 00700 General Conditions and Supplementary Conditions 2. Comply with Section 01065 Code and Permit Requirements 3 Comply with Section 01630, Product Options and Substitutions C. Related Work Specified Elsewhere 1 Section 01300 Submittals 2. Section 01310 Progress Schedules D Contract Conditions I Independent testing agencies, whether employed by the Owner or the Contractor, are not authorized to release, revoke, alter or enlarge the requirements of the Contract Documents or to approve or accept any portion of the work. 2. Employment of testing agencies, by the Contractor or the Owner, shall not relieve the Contractor of his obligation to perform the work in accordance with the Contract Documents. E. Owner's Responsibility for Inspections and Tests 1 The Owner will employ and pay for the services of an independent testing laboratory to perform the required services which are indicated in this section as the Owner's responsibility (if any). F Contractor's Responsibility for Inspections and Tests 1 The Contractor shall be responsible for inspections and tests required in Division 2 through 16 and not indicated to be the Owner's responsibility 2. The Contractor shall be responsible for and pay the expense of additional inspections and tests by the Owner's testing laboratory caused by defective work or ill -timed notice. 3 The Contractor shall remove and replace defective work at no cost to the Owner G. Code Inspections 1 Inspections and tests specified herein are in addition to those performed by code officials as required by the applicable codes. Any costs associated with code inspections shall be included in the contract sum. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.4 SUBMITTALS SECTION 01400 PAGE 2 QUALITY CONTROL A. The Contractor shall forward four copies of inspections and tests to the Architect for his use and for distribution to the Owner and consultants. B. The Owner's testing laboratory shall forward one copy each of inspections and tests directly to the Owner, the Architect, the Architect's consultants as directed, and the Contractor Additional copies shall be forwarded to the building official or other authorities as requested. C. Include the following information in all types of reports: 1. Date of report 2. Project name and number 3 Description of the quality control activity 4 Name, address, and phone number of entity performing activity 5 Date quality control activity was performed 6 Specification section(s) involved 7 Basis for evaluation (test method, etc.) 8. Results or conclusions, including evaluations and interpretations 9 Title, name, and signature of person performing activity D Include the following information in all test reports: 1 Locations from which samples were taken, if any 2. Ambient conditions at time of activity 3 Recommendations on retesting, if any 1.5 QUALITY ASSURANCE A. General Workmanship Standards: Except as specifically defined in individual sections, conform to the recognized workmanship quality standards (including ANSI standards where applicable) equal in all respects to best recognized practice of trade. Every installer performing a category of work is required to be: 1 Prequalified to the extent of being familiar with the applicable and recognized quality standards for his/her category of work. 2. Capable of workmanship complying with those standards. B Industry Standards and Recommendations 1 Applicable standards of construction industry shall be considered a part of the Contract Documents whether or not referenced. 2. Where industry associations are referenced, their published standards related to work specified shall be considered a part of the Contract Documents. 3 Industry or manufacturer's recommendations shall be considered mandatory 4 Referenced standards shall take precedence over nonreferenced standards. 5 Unless otherwise indicated, standards shall be those in effect as of date of Contract Documents. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01400 PAGE 3 QUALITY CONTROL C. Qualifications for Owner's Testing Laboratory The testing laboratory will be selected by the Owner and approved by local jurisdiction. The laboratory will meet ASTM E329 -67T standards. D Qualifications for Contractor's Testing Laboratory 1 As indicated in individual sections. 2. A firm independent from the Contractor's organization. 3 Experienced in the testing specified and having the capability of conducting satisfactorily the testing specified without delaying the progress of the work as shown by information supplied as required by ASTM E699 E. General Testing Laboratory Coordination. Where the Owner has employed a testing agency to test or inspect a portion of the work and the Contractor also is required to employ a testing agency for the same or a related element, do not employ the same testing agency unless otherwise agreed upon in writing by the Owner F Qualifications of Manufacturers 1 As indicated in individual sections. 2. The term 'experienced," unless otherwise indicated, means having 5 years of successful production of products similar to those to be used on this project. 3 Where qualifications are required to be submitted but no specific qualifications are specified, use only experienced manufacturers. 4 Manufacturer's field personnel shall be employed directly by the manufacturer and normally performing the activities specified. G. Testing Equipment: Calibrated at reasonable intervals with devices of an accuracy traceable to either the National Bureau of Standards (NBS) standards or to accepted values of natural physical constants. 1.6 COORDINATION WITH OTHER ENTITIES A. Cooperate with other entities performing quality control activities. B. Provide samples of materials and design criteria as indicated and when requested. C. Provide other assistance, equipment, tools, and storage facilities as specified. D If desired, make arrangements with those entities and pay for additional similar testing or inspection required for the Contractor's use or convenience. 1.7 SCHEDULING A. Prepare a schedule of quality control activities required. 1 Include activities of the Owner's testing agencies. 2. Provide the following information for each activity a. b c. d. Specification section number Description of the activity Identification of test or inspection methods Enumeration of results required e. Number of tests required or related MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS f. Number and type of samples to be taken, if any g. Starting time of activity h. Date work will be ready for the Owner's testing agency access i. Elapsed time required for activity j. Entity responsible k. Special requirements for activity SECTION 01400 PAGE 4 QUALITY CONTROL B. Coordinate quality control activities to avoid delay and to avoid the necessity of removing and replacing construction to accommodate testing and inspections. C. Notify the Owner's testing agencies 14 working days prior to commencement or completion of work which is to be tested or inspected, whichever is applicable. PART 2 PRODUCTS 2.1 Not used. PART 3 EXECUTION 3.1 GENERAL A. Provide work of the specified quality Where quality level is not indicated, provide work of quality customary in similar types of work. 1 Where codes, laws, or regulations require work of higher quality or performance, provide work complying with those codes, laws, and regulations. 2. Where two or more quality provisions of the Contract Documents conflict, comply with the most stringent requirement. Where requirements are different but apparently equal, and where it is uncertain which requirement is most stringent, obtain clarification from the Architect before proceeding. 3 Actual quality may exceed the specified quality Verify that such differences are acceptable to the Owner (other criteria may make excessive quality undesirable). B Control products, suppliers, manufacturers, site conditions, installers, and workmanship in such a manner as to produce work of the specified quality C. Comply with manufacturers' instructions and recommendations. 1 Keep a record of instructions and recommendations which supplement or conflict with the manufacturer's written instructions. 2. When manufacturers' instructions and recommendations conflict with the Contract Documents, obtain clarification from the Architect before proceeding. D Use installers who are capable of producing work of the specified quality E. Perform all quality control activities specified unless indicated to be performed by other entities. F Perform tests as specified. When results of tests are unsatisfactory make whatever changes or repairs are necessary and retest. G. Perform inspections as specified. When inspections reveal unsatisfactory work, make whatever changes or repairs are necessary and reinspect. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.2 CONTRACTOR'S PREINSTALLATION QUALITY CONTROL SECTION 01400 PAGE 5 QUALITY CONTROL A. Coordination of Work: Well in advance of the installation of every major unit of work which requires coordination with other work, the Contractor shall ensure that the unit of work can be installed and function as intended and required in conjunction with other work which has preceded or will follow In event of conflicts, the Contractor shall determine corrective action required, inform the Architect, and proceed with Architect's concurrence. B. Inspection of Conditions: The Contractor shall require the installer of each major unit of work to (1) inspect the substrate to receive the work, (2) inspect the conditions under which the work will be performed, and (3) report (in writing to the Contractor) unsatisfactory conditions. The installer shall not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to him. C. Notice for Owner's Testing Lab: The Contractor shall notify the Owner's testing laboratory the structural engineer and the Architect not less than 24 hours before work requiring inspection or testing is started. 3.3 CONTRACTOR'S INSTALLATION QUALITY CONTROL A. Manufacturer's Instructions: Where installations include manufactured products, the Contractor shall comply with the manufacturer's applicable instructions and recommendations for installation. To whatever extent these are more explicit or more stringent than applicable requirements, indicate in the Contract Documents. B. Inspection: The Contractor shall inspect each item of material or equipment immediately prior to installation and reject damaged and defective items. C. Attachments and Connections: Provide attachment and connection devices and methods for securing work properly as it is installed, true to line and level, and within recognized industry tolerances if not otherwise indicated. Allow for expansions and building movements. Provide uniform joint widths in exposed work, organized for best possible visual effect. Refer questionable visual effect choices to Architect for final decision. D Verify Dimensions: Recheck measurements and dimensions of the work as an integral step of starting each installation. E. Conditions for the Work: Install work during conditions of temperature, humidity exposure, forecasted weather, and status of project completion which will ensure the best possible result for each unit of work in coordination with the entire work. Isolate each unit of work from noncompatible work as required to prevent deterioration. F Closing -in the Work: Coordinate enclosure of work with required inspections and tests so as to avoid the necessity of uncovering work for that purpose. G. Mounting Heights: Except as otherwise indicated, mount individual units of work at the industry- recognized standard mounting heights for the applications indicated. Refer questionable mounting height choices to the Architect for final decision. H. Finished Height for Site Items 1 Adjust finished elevations and locations of site items, including fire hydrants, catch basins and other drains, and light standards, as required for perfect operation on grades per architectural site plans. 2. Adjust grades and site items as required or directed to maintain drains at low points and maintain functional slopes toward all drains. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 RESPONSIBILITIES OF OWNER'S TESTING LABORATORY A. Provide inspection of work listed below B. Make tests required by applicable building codes and these specifications. SECTION 01400 PAGE 6 QUALITY CONTROL C. Submit written reports of inspections and tests to Superintendent of Buildings, the Architect and his structural engineer, and the Contractor 3.5 SCHEDULE OF TESTS AND INSPECTIONS BY OWNER'S TESTING LABORATORY A. Metals 1 Reinforcing Steel Inspection a. Inspector shall inspect all reinforcement for concrete work for size, dimensions, locations, and proper placement. Inspector shall be present during welding of all reinforcing steel. b. Reinforcing steel need not be tested except as shown; however, mill certificates or affidavits will be required and all reinforcing steel shall be tagged for identification at the job site by the inspector 2. Metal Decking a. Tests: Continuous inspection of all deck welding will be made. The Contractor shall supply samples and test pieces and provide facilities for inspection without extra charges. The Contractor shall schedule his work so that costs of inspection to the Owner will be kept to a minimum. The provisions of continuous inspection by the Owner will not relieve the Contractor from performing the work in accordance with the Contract Documents. b. Inspection of Steel Welding: Shall be made to ensure that seam welds and puddle welds are made in accordance with these plans and specifications. Inspection shall ensure that proper electrodes, current, travel, and speed are used and that no cracks, serious undercutting, overlap, surface holes, or slag inclusions occur c. Weld Test: In addition to the required welder qualifications, prior to each welder starting work on the job and periodically as the inspector determines, each welder shall perform a weld test to demonstrate to the inspector his ability to produce a satisfactory weld. The weld test shall be as follows: (1) Weld at least two samples of deck material to a base steel section simulating the framing with one weld each sample. Twist the deck sample with respect to the base until failure occurs. If the decking tears or if the weld on shearing in torsion show the proper fusion area, the welds are satisfactory (2) Questionable welding of the permanent decking may be checked by the inspector by suitable means, including ultrasonic methods if applicable. 3 Structural Steel a. General (1) Testing laboratory shall perform inspections and testing of structural steel work in accordance with this section and as required to certify materials and installation are in compliance with the Contract Documents and Section 05120, Structural Steel, and Section 05500, Metal Fabrications. (2) Contractor shall notify the testing laboratory at least two weeks in advance of the mill and shop schedules before the start of any qualification testing or welding. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01400 PAGE 7 QUALITY CONTROL (3) Corrective measures, including additional and more complete testing which may result from these tests, shall be by the Contractor at his expense. (4) Contractor shall furnish the testing laboratory with the following: (a) Complete set of approved shop and erection drawings and modifications (b) Mill test reports (c) Information as to time and place of all rollings and shipment of materials to shop (d) Proper facilities, including scaffolding, temporary work platforms, adequate access to all structural members, etc. for inspection and testing of the work in the shop and field (e) Representative sample pieces requested for testing (f) Each person installing connections shall be assigned an identifying symbol or mark and all shop and field connections shall be so identified so that the inspector may refer back to the person making the connection. b. Unidentified Steel (1) Structural steel which is not clearly identified by mill shipping statements and certified mill reports shall be tested. (2) Construction manager shall furnish samples for testing 5 percent of the unidentified steel. (3) Cost of testing materials and cost of testing shall be paid by construction manager c. Plant Inspection (1) Inspection testing laboratory shall inspect structural steel at the plant before shipment as well as during erection. (2) Architect reserves the right to reject any material at any time before final acceptance which does not conform to all of the requirements of the Contract Documents. d. Shop Inspection (1) Visually inspect all structural steel elements and components during fabrication. (2) Inspect and test shop welds in accordance with requirements for welding specified in this section. (3) Check shapes, sizes, classes, and types of steel, high strength and unfurnished threaded fasteners, and testing and welding materials. (4) Verify and report all special corrections performed by the fabricator on his own initiative. Inspect bolted connections in accordance with Section 05120 Structural Steel. (6) Review reports of inspections performed by the construction manager's testing agency e. Field Inspection and Testing (1) Verify locations and anchorages, inserts, and adjustments. (5) MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDTTIONS ALTERATIONS SECTION 01400 PAGE 8 QUALITY CONTROL (2) Visually inspect erection of all structural steel components. (3) Inspect and test all field welding, including welded studs in accordance with requirements specified in this section. (4) Inspect and test all field bolted connections in accordance with Section 05120, Structural Steel. Inspect and verify plumbness and tolerances of structural frame for compliance with AISC "Code of Standard Practice." (6) Verify and report all special corrections performed by the fabricator on his own initiative. f. Welding Requirements (1) Review all field and shop welding procedures for compliance with AWS specifications. (2) Review all shop and field welder certifications. (3) Visually inspect all welded connections. (4) Perform magnetic particle testing in accordance with ASTM E709 and at the discretion of testing agency for all questionable welds. Ultrasonically test 100 percent of all complete penetration welds in accordance with AWS D1 1, Section 6, by American Society of Non Destructive Testing (ANST) level II technicians. (6) Ultrasonically test 100 percent of all partial- penetration welds. Ultrasonic test may ignore defects in first 1/8 inch of root pass. (7) Visually inspect meal deck welds on a random, 15 percent minimum, basis for quality of welds. (8) Review field plug weld certification procedure and welders for this procedure. (9) Visually inspect all shear stud installation for complete fusion and weld flash or fillet for a minimum of 90 percent of the circumference. g. Bolting Requirements: See Section 05120 Structural Steel. h. Testing Laboratory Reports: Shall be complete as specified elsewhere in this section and include the following information: (1) Adequate description of each weld testing, the identifying mark of the welder responsible for the weld, a critique of any defects noted by visual inspection or testing, and a statement regarding the acceptability of the weld tested as judged by current AWS standards (2) Survey readings of all columns (3) Statement indicating final approval of welded and bolted connections (4) Statement indicating that materials and installation comply with Contract Documents and specifications applicable to this work. i. Weld Testing (1) Full -time steel shop fabrication inspection shall be provided by a special inspection who is also a level II or III ultrasonic technician. (2) Ultrasonic testing shall be performed on 100 percent of the full penetration welds. (5) (5) 1 �A MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS Ultrasonic Testing (1) All penetration multi -pass groove welds shall be subject to ultrasonic testing. (2) All defective welds shall be repaired and retested with ultrasonic equipment. (3) Initially all multi pass groove field welds shall be tested at the rate of 100 percent of each individual welder, if rejectable defects occur in less than 5 percent of the welds tested. If the rate of rejectable defects increases to 5 percent or more, 100 percent testing shall be re- established until the rate is reduced to less than 5 percent. The percentage of rejects shall be calculated for each welder independently (4) When ultrasonic indications arising from the weld root can be interpreted as whether a weld defect or the backing strip itself, the backing strip shall be removed at the expense of the Contractor, and, if no root defect is visible, the weld shall be re- tested. If no defect is indicated on this re-test and no significant amount of the base and weld metal have been removed, no further repair or welding is necessary If a defect is indicated, it shall be repaired at the Contractor's expense. The ultrasonic instrumentation shall be calibrated by the technician to evaluate the quality of the welds in accordance with AWS D1 0 -79 (6) Should defects appear in welds tested, repairs shall be similarly inspected at the Contractor's expense and at the direction of the Architect until satisfactory performance is assured. (7) Other methods of inspection (for example: X -ray ganuna ray magnetic particle, or dye penetrant) may be used on welds if the Architect feels necessary 4 Testing of Shear Stud Connectors a. Testing laboratory shall perform inspections of shear stud connectors in accordance with this section and as required for compliance with Contract Documents. b Provide verification that shop and field installation of all shear stud connectors is in accordance with AWS D1 1, Sections 4.29 and 4.30 c. Where the rejection rate for any welder exceeds 5 percent, each stud welded by that welder shall be struck twice by a hammer with a force sufficient to indicate whether or not a quality weld has been obtained. This hammer test is in addition to the two stud 30- degree bend test required by Section 4.29 d. Visual inspection shall be done after ferrule removal. e. Certification of stud base qualification by manufacturer per AWS D1.1, Section 4.31, shall be supplied to Owner's testing agency J• (5) SECTION 01400 PAGE 9 QUALITY CONTROL B Roofing and Waterproof Membranes 1 Continuously inspect during application of all roofing and membranes. 2. Inspect and verify condition of deck prior to application of roofing and membrane. Inspect, for water tightness, all flashings and sealing at penetrations in waterproof barrier 3.6 REPAIR AND PROTECTION BY CONTRACTOR A. Upon completion of inspection, testing, sample- taking, and similar services, repair damaged construction and restore substrates and finishes to eliminate deficiencies, including deficiencies in visual qualities of exposed finishes. Comply with Section 01045 Cutting and Patching. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS B. Protect construction exposed by or for quality control service activities and protect repaired construction. C. Repair and protection is the Contractor's responsibility regardless of the assignment of responsibility for inspection, testing, or similar services. 3.7 ADJUSTMENT AND CLEANING 0 1997 Mahhun Nordfors McKinley Gordon SECTION 01400 PAGE 10 QUALITY CONTROL A. Adjust, clean, lubricate, restore marred finishes, and protect newly installed work to ensure that it will remain without damage or deterioration during the remainder of the construction period. END OF SECTION 01400 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. Work Includes 1 The temporary construction service facilities of all kinds required to complete the work as specified herein. 2. Removal of temporary facilities prior to acceptance. 1.4 QUALITY ASSURANCE A. Regulations 1 Conform with Section 01065 Code and Permit Requirements. SECTION 01500 PAGE 1 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS B Precautions 1 Take all necessary precautions for the safety of employees and other personnel on the site of the work; comply with all applicable provisions of Federal, State, and Municipal Safety Laws and Building Codes to prevent accidents or injury to persons on, about or adjacent to the premises where the Work is being done. 1.5 RESPONSIBILITY A. Unless otherwise specified, the Contractor for the general Contract shall be responsible to provide and maintain during the construction period the Temporary Facilities named herein. They shall be located as directed and terminated and removed from the premises prior to the Final Payment. PART 2 TEMPORARY CONSTRUCTION 2.1 CONTRACTOR'S OFFICE A. Job office trailer must be approved and located by Property Owner One or more vacant rooms within the construction area may be made available for the Contractors use, subject to any terms and conditions the Owner may specify B. Contractor staging area and project access shall be coordinated with the Property Owner C. The Contractor shall include in his bid all temporary structures, chutes, barriers, and the cost of correcting the disturbed areas back to their condition on the day of Notice to Proceed. 2.2 DUSTPROOF ENCLOSURES A. Provide dust -proof enclosures sufficient to protect occupied spaces from remodeling work for the duration of the work. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS B. Take all necessary precautions to prevent the migration of dust and debris into the existing mechanical system. Any damage to the existing mechanical systems caused by dust or debris will be repaired by the Contractor immediately at the Contractor's expense. 2.3 WEATHERPROOF ENCLOSURES SECTION 01500 PAGE 2 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS C. Construct dust -tight bathers within or at the edge of the existing building. Survey the existing air duct system and seal appropriate grilles so dust will not be deposited within or through the system. Dust barriers shall be constructed of non combustible studs with 5/8' GWB on public side, painted with two coats of paint, color to match adjacent surfaces or as selected. Extend dust barriers above the finish ceilings. Where passageways must be maintained for the Owner's or Contractor's access, provide temporary solid core wood door with latching hardware in hollow metal frame. Provide floor mats at both sides of door to prevent spread of construction dust to other areas of the building. A. Provide weather -proof enclosures sufficient to protect occupied spaces from exterior weather where existing exterior walls and roofs are demolished. Maintain weather -proof enclosure for the duration of the work, or until permanent exterior walls and roofs are weather tight. B. Take all necessary means to prevent moisture from penetrating into the occupied spaces. Adequately seal edges and penetrations to eliminate drafts. Insulate weather -proof enclosures equal to scheduled permanent enclosures. C. Construct weather -proof barriers within or at the edge of the existing building. Weather -proof barriers shall be constructed of non combustible studs with 5/8' GWB on occupied side, painted with two coats of paint, color to match adjacent surfaces or as selected. Exterior face to be 3/4 inch fire- treated plywood with 15 lb asphaltic felt layered in a shingle fashion to shed water Where passageways must be maintained for the Owner's or Contractor's access, provide temporary hollow metal door with latching hardware and dead -bolt in hollow metal frame. 2.4 FIRE PROTECTION A. Provide fire protection during all phases of construction as indicated on State Fire Marshal Information Sheet A -1, "Fire Protection During Construction." A copy of this sheet is attached at the end of this section. 2.5 PAINTING OF TEMPORARY STRUCTURES A. Coat temporary structures and barriers with two (2) coats prepared paint, color selected. 2.6 TEMPORARY CONSTRUCTION SAFETY BARRIERS A. Provide 6 -0' high temporary chain link fencing with locked gates around all structures under construction and around all hazardous conditions caused by construction or excavation. Provide signage in all principle directions reading: Danger Construction Area Keep Out Take care to keep construction safe and free of hazards at all times. Secure the site at the end of each day Remove all ladders and access to building. 2.7 TEMPORARY TOILETS A. The Owner's facilities may be used per any restrictions or designations established by the Owner 2.8 PUBLIC UTILITIES A. The Contractor shall take care of all public utilities encountered in connection with his work; he shall pay all expenses therewith. He shall properly support all water, sewer gas, electric, 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS telephone, and other services and shall immediately notify persons or corporations owning the same granting them the opportunity to take such precautions as they see fit. The Contractor shall be responsible for all damage caused by his operations. PART 3- EXECUTION 3.1 PROTECTION OF PROPERTY AND UTILITIES 9 Only Owner's personnel will shut down and restart utilities. SECTION 01500 PAGE 3 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS A. Fire Watch 1 The Contractor shall conduct his operations in a fire -safe manner subject to approval of the Owner or his authorized representative. 2. He shall provide and maintain a sufficient number of fire extinguishers of the proper type in locations readily available in case of a fire. 3 He shall clear the premises of excessive rubbish and debris. 4 He shall comply with the applicable provisions of the governing fire code which, by reference, shall be incorporated into these specifications. 5 The Contractor shall immediately correct any deficiencies brought to his attention. 6. Where significant or continued non compliance is noted, the Owner reserves the right to stop the work, at no extra cost or extension of time, pending remedial action. B. Continuity of Utility Services 1 Continuity of utility services to and within existing buildings shall be reasonably maintained at all times. 2. The Contractor shall submit a schedule of utility shutdowns within thirty (30) days after the Notice to Proceed. 3 The Contractor shall confirm all requests for utility shutdowns in writing to the Owner not less than one (1) week prior to the proposed date. Requests shall include as a minimum the following information. a. Utility services affected. b. Reason shutdown is required. c. Work to be accomplished during the shutdown. d. Proposed shutdown date and time. e. Duration of the shutdown. 4 The actual time and date of all shutdowns will be subject to approval of the Owner 5 In general, they will be scheduled for nights, weekends, or other low intensity use periods. 6 The duration of all shutdowns shall be held to a reasonable minimum as determined by the Owner 7 Materials and equipment required for the work to be accomplished during shutdown shall be complete and available on the job for review by the Owner three (3) days prior to the shutdown. 8. If the Contractor is not adequately prepared, the shutdown will be canceled and re- scheduled. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 01500 PAGE 4 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 10 Owner will inspect the installation prior to restarting and will not restart if an unsafe condition exists. 11 In the event the Contractor's work is not completed during the time scheduled for the shutdown, the Owner may elect to restart the utilities service. In that event, additional shutdown requirements shall be re- scheduled in accordance with the preceding requirements. 12. Restarting shall not be construed as acceptance of the work as complete. 13 The Contractor shall include in the bid all costs associated with utilities shutdowns. 14 The Owner will make no extra payment for overtime work, schedule changes or failure to complete utilities connections within authorized shutdown periods. C. Cleaning and Protection of Existing Surfaces: 1 Keep public areas adjacent to construction area and along access route to construction area free of dust and debris. Provide daily cleaning at end of work shift to prevent accumulation of dust and permanent soiling of finishes. 2. Provide floor protection along route of access to construction area when removing debris or delivering materials. 3 Provide protection mats for interior of elevator cabs that are in route of access to construction. 3.2 WASTE REMOVAL A. All refuse and waste material, including excess or unusable earth from excavation, shall be disposed of legally by the Contractor off the Owner's property B Waste material shall not be stockpiled on the Owner's property C. Immediately clean up any spilled material from buildings, roads, etc. 3.3 TEMPORARY CONSTRUCTION SERVICE FACILITIES A. General 1 The Contractor shall provide those temporary construction service facilities, prior to acceptance by Owner, as required, including all public utility connections, heating systems, and electrical services. 2. All installations shall comply with applicable Federal, State and local codes. 3 All temporary construction service facilities shall be removed by the Contractor prior to acceptance by the Owner B. Temporary Heat 1 The Contractor shall provide temporary heat as required to protect materials and equipment from dampness and cold. 2. The method of heating is subject to approval of the Architect. 3 The project's permanent heating plant may not be used for temporary heating. C. Temporary Illumination 1 Furnish a temporary illumination system which will provide not less than 10 footcandles or adequate illumination of building areas as required to maintain a high level of workmanship for all trades. In addition, provide adequate security and safety lighting for 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Provide and maintain security lighting as appropriate to provide general illumination of the work area during night time hours. D Telephone 1 Provide non -coin box telephone connected to nearest city exchange. 2. Install when work is started; maintain until full completion; pay all charges. 3 Allow all those connected with the Work to use, provided they pay for toll calls. E. Fax 1 Provide in office; pay all charges. F Access to Site 1 Access to site for material and personnel shall generally be from the exterior directly into the area of work. Avoid passing through occupied areas of the hospital. G. Storage of Materials 1 Store materials carefully Do not exceed the load capacity of existing or new floors at any time. 2. Up to ten parking spaces in the Owner's parking lot located across Caroline Street from the East campus may be used by the Contractor to park lockable storage containers or store pre ordered materials. Security and protection of materials from weather are the responsibility of the Contractor 3.4 NOISE CONTROL SECTION 01500 PAGE 5 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS all stairways, corridors, passageways and other areas as required for pathway lighting throughout the building. Pathway illumination level shall be a minimum of 2 footcandles. A. The purpose of this specification is to keep the level of construction noise inside adjacent existing buildings and/or rooms from exceeding a dBA 55 curve (with windows closed) during all occupied hours. The Contractor may meet this criteria by erecting barriers between equipment and occupied areas. B Outdoor Vehicle and Internal Combustion Engine Noise: Noise level of each piece of equipment shall not be greater than 86 DBA at a distance of 50 feet as measured under noisiest operating conditions. Rubber -tired equipment will be used whenever possible instead of equipment with metal tracks. Mufflers for stationary engines shall provide hospital area quality of silencing. C. Indoor Noise: Use of noise producing vehicles and equipment within existing buildings is subject to Owner's approval. D Air Compressors: Equipment with silencing packages. Electric driven preferred. E. Jack Hammers: Use prohibited. Use core drilling or saw cutting equipment whenever possible. F General. Any equipment that can be electrically driven instead of gas or diesel is preferred. If noise levels on any gear cannot reasonably be brought down to criteria, either that gear will not be allowed on the job or use times will have to be scheduled subject to approval of the Owner Conformance to this specification shall be included in the Contract price and no compensation will be allowed for special equipment, overtime, etc. that may be required. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.5 VEHICULAR CONTROL 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01500 PAGE 6 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS A. Traffic Regulation 1 Existing walkways and roadways leading past new work areas shall remain clear and safe at all times. This shall include access and paths for pedestrian flow B. Refer to additional requirements in 01010 Summary of Work and 01011 Contract Time and Sequence. C. On site parking for the Contractor's vehicles is subject to the limitations imposed by the Property Owner END OF SECTION 01500 1 i 1 r 1 r 1 1 The following information issued by the Office of the State Fire Marshal, State of Washington. Health Care Facihties Fire Protection Plan Review Information Sheet No A -1 Fire Protection During Construction April 10 1980 Revised 6/86 Records of the national Fire Protection Association indicate fatal fires have occurred when construction, remodeling, or demolition has been done in occupied buildings. The 1976 Life Safety Code FNPA Standard 101 Section 1 5 4 states, `Existing buildings may be occupied during repairs or alterations only if all existing exits and all existing fire protection are continuously maintained or in lieu thereof, other measures are taken which provide equivalent safety The following shall be observed during the demolition, construction, repair or alteration period as applicable. 1 Area Separation. Provide a temporary one -hour fire resistive separation between the construction area and all other areas of the building. If this is not feasible, fire watchman service shall be performed by trained and experienced personnel acceptable to the State Fire Marshal and local fire official. (Preferably equipped with portable radio communication.) 2 Exits: Construction or demolition shall not interfere or obstruct the exits or exiting system. Should it become necessary to do so, alternative methods shall first be approved by the local fire official and the State Fire Marshal. 3 Flammable Gases: Flammable gases and oxygen tanks shall not be used or stored in the building. Tanks shall be kept on the exterior and approved piping or UL- listed hoses used to convey the gases inside. Such tanks shall be positioned at least 20 feet from any building opening. 4 Flammable Liouids: Flammable liquids at the job site shall not be stored in building and shall otherwise be stored, dispensed, and used in accordance with the requirements of the local fire official and 1985 Uniform Code. 5 Housekeeping: Good housekeeping shall be maintained at all times. 6 Fire Extinguisher: Proper and adequate portable fire extinguishers shall be readily available. 7 Special Hazards: The local fire official and State Fire Marshal shall be contacted for procedure involving any special hazards or conditions. MAIH.UM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. General. Administrative and procedural requirements governing the Contractor's selection of products for use in the project. B. Requirements 1 Compliance with industry standards and recommendations 2. Product selections and substitutions 3 Warranties C. Related Requirements Specified Elsewhere 1 Section 01091 Reference Standards 2. Section 01300 Submittals 3 Section 01310 Progress Schedule 4 Section 01400 Quality Control 5 Section 01500 Construction Facilities and Temporary Controls 6 Section 01610 Delivery Storage, and Handling '7 Section 01630 Product Options and Substitutions 8. Section 01745 Warranty Procedures SECTION 01600 PAGE 1 MATERIAL AND EQUIPMENT D Definitions: Definitions used in this section are not intended to change or modify the meaning of other terms used in the contract documents. 1 Products: Items purchased for incorporation in the work, whether purchased for the project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent. 2. Named Products: Items identified by manufacturer's product name, including make or model designation, indicated in the manufacturer's published product literature, that is current as of the date of the contract documents. 3 Materials: Products that are substantially shaped, cut, worked, mixed, finished, refined, or otherwise fabricated, processed, or installed to form a part of the work. 4 Equipment: A product with operational parts, whether motorized or manually operated, that requires service connections such as wiring or piping. 1.4 SUBMITTALS A. Comply with Section 01300 Submittals. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 2-PRODUCTS 2.1 GENERAL LINIITATIONS 2.2 PRODUCT SELECTIONS 1.8 SCHEDULING A. Comply with Section 01310 Construction Progress Schedule. 1.9 WARRANTY A. Comply with Section 01745 Warranty Procedures. SECTION 01600 PAGE 2 MATERIAL AND EQUIPMENT 1.5 QUALITY ASSURANCE A. Comply with Section 01400 Quality Control, and Section 01091, Reference Standards. 1.6 DELIVERY STORAGE, AND HANDLING A. Comply with Section 01610 Delivery Storage, and Handling. 1.7 PROJECT CONDITIONS A. Verify conditions at site affecting work to ensure the best and most complete installation per industry standards. A. Where possible, provide entire required quantity of each generic product from single source. Where not possible to do so, match separate procurements as closely as possible. B. To extent selection process is under Contractor's control, provide compatible product. C. Where available and complying with requirements, provide standard products which have been used previously and successfully in similar applications and which are recommended by the manufacturers for the applications indicated. A. General. It is the Contractor's responsibility to select products which comply with the contract documents and which are compatible with one another 1 Verify that electrical characteristics of products are compatible with electrical systems. Notify Architect of all discrepancies. 2. Where visual matching to an established physical sample is required, the Architect's decision will be final. 3 Provide products complete with all accessories, trim, finish, safety guards, and other devices and details needed for a complete installation and for the intended use and effect. B Single Product Named: Provide only the product(s) specified, unless determined with prior approval to be unavailable, noncompatible with the work, or noncomplying with requirements or governing regulations. C. Two or More Products Named. Selection from named products is Contractor's option, provided selection complies with requirements specified. D Equivalent Products: Where specification allows for "or equivalent" product, product selection shall be submitted for review and Architect's approval during the bidding period per Section 00100 Instructions to Bidders. 1 1 1 1 t 1 1 1 1 i MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS E. Acceptable Manufacturers Named. Where a particular manufacturer's product is named, similar products by other named manufacturers may be used provided they comply with requirements of the contract documents F Quality Standard Product Named .1 Where a quality standard product or material is named, the manufacturer's product data and specifications, as most recently published, are incorporated in the contract documents. 2. Components of the quality standard product may be referenced in the contract documents using manufacturer's model or part numbers. The work shall conform, or be equivalent, to the quality standard product and components as indicated. 3 Identification of a quality standard product is intended to establish quality standard. Equivalent products by approved manufacturer's are acceptable if approved in addenda. G. Substitutions: Products other than those named in this manual shall be only those approved during bidding period per Section 00100 Instructions to Bidders. H. Visual Selection. Where specified product requirements include the phrase .as selected from manufacturer's standard colors, patterns, textures. or a similar phrase, select a product and manufacturer that complies with other specified requirements. The Architect will select the color pattern, and texture from the product line selected. PART 3 EXECUTION 3.1 EXAIVIINATION A. Require installer of each major unit of work to inspect substrate and conditions for installation and to report (in writing) unsatisfactory conditions to satisfaction of installer before proceeding. B Inspect each product immediately before installation and do not install damaged or defective product. 3.2 PREPARATION A. Prior to starting installation of each major component of the work, hold a preinstallation conference, attended by each entity involved or affected by planned installation. Include technical representatives of product manufacturers and others recognized as expert or otherwise capable of influencing success of the installation. Review significant aspects of requirements for the work. Record discussion and distribute as plan of action. 3.3 INSTALLATION A. General SECTION 01600 PAGE 3 MATERIAL AND EQUIPMENT 1 Comply with manufacturer's instructions and recommendations. Anchor securely in place; accurately locate and align with other work. Clean and protect to ensure that products will be free from damage and deterioration at time of acceptance. B Nameplates 1 Where needed for operation and maintenance, provide permanent engraved plastic laminate nameplates on equipment, located in inconspicuous places, and containing suitable information and operational data. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 FIELD QUALITY CONTROL A. Comply with Section 01400 Quality Control. a 3.5 CLEANING AND PROTECTION B Clean each element of work at time of installation. 0 1997 Mahlmn Nordfors McKinley Gordon SECTION 01600 PAGE 4 MATERIAL AND EQUIPMENT 2. Otherwise, do not allow manufacturer's trademarks or similar labels or nameplates to be placed on products in locations where exposed to view after installation. A. Comply with Section 01500 Construction Facilities and Temporary Controls, and Section 01710 Final Cleaning. C. Provide sufficient maintenance and protection during construction to ensure freedom from damage and deterioration at time of substantial completion. END OF SECTION 01600 1 f f 1 MAHLUM NORDFORS McKINNLEY GORDON. OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION SECTION 01610 PAGE 1 DELIVERY STORAGE AND HANDLING A. Deliver store, and handle products in accordance with the manufacturer's recommendations, using means and methods that will prevent damage, deterioration, and loss, including theft. B Schedule delivery to minimize long -term storage at the site and to prevent overcrowding of construction spaces. C. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses. D Deliver products to the site in the manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing. Labels to include: 1 Name of product 2. Name of manufacturer 3 Date of manufacture, where applicable 4 Shelf life, where applicable 5 Quality or grade, where applicable 6 Lot number where applicable 7 Fire performance characteristics, where applicable E. Store products at the site in a manner that will facilitate inspection and measurement of quantity or counting of units. F Store heavy materials away from the project structure in a manner that will not endanger the supporting construction. I G. Store products subject to damage by the elements above ground, under cover in a weathertight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required by manufacturer's instructions. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 01610 MAHLUM NORDFORS McIINLEY GORDON SECTION 01630 PAGE 1 OLYMPIC MEMORIAL HOSPITAL PRODUCT OPTIONS AND 2 MAIN/SURGERY ADDITIONS ALTERATIONS SUBSTITUTIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. General. Administrative and procedural requirements for handling product options and requests for substitutions made after award of the contract. B Requirements 1 Compliance with industry standards and recommendations 2. Product selections and substitutions 3 Warranties C. Related Requirements Specified Elsewhere 1 Section 01091, Reference Standards 2. Section 01300, Submittals 3 Section 01310 Progress Schedule 4 Section 01400 Quality Control 5 Section 01500 Construction Facilities and Temporary Controls 6 Section 01600 Material and Equipment 7 Section 01610 Delivery Storage, and Handling 8 Section 01745 Warranty Procedures D Definitions: Definitions used in this section are not intended to change or modify the meaning of other terms used in the contract documents. 1 Products: Any product, material, or equipment. 2. Substitution. Requests for changes in products, materials, equipment, and methods of construction required by contract documents proposed by the Contractor after award of the contract. The following are not considered substitutions and are not subject to requirements specified in this section for substitutions: a. Substitutions requested by bidders during the bidding period, and accepted prior to award of contract. b Revisions to contract documents requested by the Owner or Architect. c. Specified options of products and construction methods included in contract documents. d. The Contractor's determination of and compliance with governing regulations and orders issued by governing authorities. MAHLUM NORDFORS McKINLEY GORDON SECTION 01630 PAGE 2 OLYMPIC MEMORIAL HOSPITAL PRODUCT OPTIONS AND 2 MAIN /SURGERY ADDITIONS ALTERATIONS SUBSTITUTIONS 1.4 SUBMITTALS A. Substitution Request Submittal. Request for substitution will be considered if received within sixty (60) days after commencement of the work. Requests received more than (60) days after commencement of the work may be considered or rejected at the discretion of the Architect. 1. a Submit three copies of each request for substitution for consideration. Submit requests in the form and in accordance with procedures required for change order proposals. 2. Identify the product or the fabrication or installation method to be replaced in each request. Include related specifications section and drawing numbers. Provide complete documentation showing compliance with the requirements for substitutions and the following information, as appropriate: a. Product data, including drawings and description of products, fabrication, and installation procedures. b. Samples where applicable or requested. c. A detailed comparison of significant qualities of the proposed substitution with those of the work specified. Significant qualities may include elements such as size, weight, durability performance, and visual effect. d. Coordination information, including a list of changes or modifications needed to other parts of the work and to construction performed by the Owner and separate Contractors that will become necessary to accommodate the proposed substitution. e. A statement indicating the substitution's effect on the Contractor's construction schedule compared to the schedule without approval of the substitution. Indicate the effect of the proposed substitution on overall contract time. f. Cost information, including a proposal of the net change, if any in the contract g. sum. Certification by the Contractor that the substitution proposed is equal to or better in every significant respect to that required by the contract documents, and that it will perform adequately in the application indicated. Include the Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of the failure of the substitution to perform adequately B Architect's Action. Within five (5) working days of receipt of the request for substitution, the Architect will request additional information or documentation necessary for evaluation of the request. Within fifteen (15) working days of receipt of the request, or ten (10) working days of receipt of the additional information or documentation, whichever is later, the Architect will notify the Contractor of acceptance or rejection of the proposed substitution. If a decision on use of a proposed substitute cannot be made or obtained within the time allocated, use the product specified by name. Acceptance will be in the form of a change order 1.5 QUALITY ASSURANCE A. Comply with Section 01400 Quality Control, and Section 01091, Reference Standards. 1.6 DELIVERY STORAGE, AND HANDLING A. Comply with Section 01610 Delivery Storage, and Handling. 1.7 PROJECT CONDITIONS A. Verify conditions at site affecting work to ensure the best and most complete installation per industry standards. 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON SECTION 01630 PAGE 3 OLYMPIC MEMORIAL HOSPITAL PRODUCT OPTIONS AND 2 MAIN/SURGERY ADDITIONS ALTERATIONS SUBSTITUTIONS 1.8 SCHEDULING A. Comply with Section 01310 Progress Schedule. 1.9 WARRANTY A. Comply with Section 01745 Warranty Procedures. PART 2 PRODUCTS 2.1 SUBSTITUTIONS A. The Contractor's substitution request will be received and considered by the Architect when one or more of the following conditions are satisfied, as determined by the Architect. Otherwise, requests will be returned without action except to record noncompliance with these requirements. 1 The specified product or method of construction cannot be provided within the contract time. The request will not be considered if the product or method cannot be provided as a result of failure to pursue the work promptly or coordinate activities properly 2. The specified product or method of construction cannot receive necessary approval by a governing authority and the requested substitution can be approved. 3 A substantial advantage is offered the Owner in terms of cost, time, energy conservation, or other considerations of merit after deducting offsetting responsibilities the Owner may be required to bear Additional responsibilities for the Owner may include additional compensation to the Architect for redesign and evaluation services, increased cost of other construction by the Owner or separate contractors, and similar considerations. 4 The specified product or method of construction cannot be provided in a manner that is compatible with other materials and where the Contractor certifies that the substitution will overcome the incompatibility 5 The specified product or method of construction cannot be coordinated with other materials and where the Contractor certifies that the proposed substitution can be coordinated. 6 The specified product or method of construction cannot provide a warranty required by the contract documents and where the Contractor certifies that the proposed substitution provide the required warranty B. The Contractor's submittal and Architect's acceptance of shop drawings, product data, or samples that relate to construction activities not complying with the contract documents does not constitute an acceptable or valid request for substitution, nor does it constitute approval. PART 3 EXECUTION (NOT USED 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 01630 1 1 1 1 1 r 1 1 1 1 1 1 1 SUBSTITUTION REQUEST FORM PROJECT Olympic Memorial Hospital 2 Main /Surgery Additions Alterations SPECIFICATION SECTION TO FROM PROPOSED SUBSTITUTION MANUFACTURER MODEL NO (Bidder /Contractor) PROJECT NO 96160.00 DATE PARAGRAPH Mahlum Nordfors McKinley Gordon Attached data includes product description, specifications, drawings, photographs, performance, and test data adequate for evaluation of the request (applicable portions of the data are dearly identified). Attached data also includes description of changes to contract documents which proposed substitution will require for its proper installation. The following paragraphs, unless modified on attachments are correct: A The proposed substitution does not affect dimensions shown on drawings. A I /We will pay for changes to the building design, induding engineering design, detailing, and construction costs caused by the requested substitution. A The proposed substitution will have no adverse affect on other trades, the construction schedule, or specified warranty requirements. A Maintenance and service parts will be locally available for the proposed solution. I /We state that the function, appearance, and quality of the proposed substitution are equivalent or superior to the specified item. SIGNATURE. FIRM ADDRESS PHONE. FOR USE BY ARCHITECT Accepted Accepted as Noted Not Accepted Received Too Late BY DATE Mahlum Nordfors McKinley Gordon 1997 Form 1063 9/97 MA H L U M NORDFORS McKIN LEY GORDON 2505 Third Avenue Suite 219 Seattle WA 98121 206441 4151 206 441 0478F MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. This section specifies administrative and procedural requirements for project closeout. B. Work includes: 1 Substantial completion and punch list procedures 2. Record documents 3 Operating and maintenance instructions 4 Maintenance and operation manuals 5 Warranty manual 6 Warranty list items 7 Final cleanup 8 Final acceptance 1.4 SUBMITTALS A. Comply with Section 01300 Submittals. 1.5 QUALITY ASSURANCE A. Comply with Section 01400 Quality Control. 1.6 SCHEDULING A. Comply with Section 01310 Construction Progress Schedule. 1.7 WARRANTY A. Comply with Section 01745 Warranty Procedures. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION 3.1 SUBSTANTIAL COMPLETION AND PUNCH LIST PROCEDURE SECTION 01700 PAGE 1 CONTRACT CLOSEOUT A. Initiation by Contractor 1 The Contractor shall initiate process of determination for substantial completion. 2. He shall do so by giving written notice to the Architect that the project is substantially complete (or portion thereof as previously agreed to with the Owner and Architect) and that the building official has granted permission or certification for occupancy MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS NOTE. Final payment and release of retainage will not be granted until all punch list items are complete. Each punch list item, when completed by the contractor, must be initialed by the project superintendent prior to resubmission to the architect. SECTION 01700 PAGE 2 CONTRACT CLOSEOUT B Deficiency List 1 Prior to giving notice of substantial completion, and if it is agreed to be helpful, the Architect will walk through the project with the Contractor to point out work needing completion. The list of such work, to be called the "Deficiency List," will be compiled and written by the Contractor during the walkthrough. 2. Once the Deficiency List has been corrected, the Contractor may commence with notice to the Architect indicating the area is ready for substantial completion. 3 The Deficiency List is not the Punch List. C Determination of Substantial Completion 1 Upon written notification by the Contractor, the Architect will review the project (or parts) and determine whether or not substantial completion can be recommended to the Owner If the determination cannot be made, the Contractor will be so notified. 2. If the determination can be made, the Architect will prepare a certificate of substantial completion for the respective part for the Contractor's signature and the Owner's acceptance. The Owner will occupy the building or part of the building the day after the date of substantial completion. 3 Prior to or at the same time of substantial completion, the Contractor will apply and receive a certificate of occupancy from the inspectors having jurisdiction. This must be a part of granting the substantial completion certificate. D Issuance of Punch List 1 Attached to the certificate of substantial completion, the Architect will provide the punch list indicating items of work which must be completed prior to final acceptance. 2. Upon receipt of punch list, with all items initialed as complete, architectural back -check will be performed. 3.2 RECORD DOCUMENTS A. Prepare and provide per Section 01720 Project Record Documents. 3.3 OPERATING AND MAINTENANCE INSTRUCTIONS A. General 1 Provide per Divisions 15 and 16 and as follows. 2. Time to be per Section 01011, Contract Time and Sequence, and arranged for Owner's convenience. B. Required Information 1 Operation instruction period(s) shall be conducted by Contractor for operating personnel. MAHLUM NORDFORS McKI1 LEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Instructions shall be provided in all phases of operation and maintenance for all systems, including but not limited to, the following: a. Startup b. Shutdown c. Emergency operations d. Noise and vibration adjustments e. Safety procedures f. Economy and efficiency adjustments g. Effective energy utilization 3 Contractor representatives shall be foremen or superintendents for the trade involved or manufacturer's representatives. 4 Place of the instruction period shall be as mutually agreed to. 3.4 OPERATION AND MAINTENANCE MANUALS A. Prepare and provide per Section 01011, Contract Time and Sequence, and Section 01300 Submittals. 3.5 WARRANTY MANUAL A. Prepare and provide per Section 01011, Contract Time and Sequence, and Section 01745 Warranty Procedures. 3.6 WARRANTY LIST ITEMS A. Prepare and provide per Section 01745 Warranty Procedures. 3.7 FINAL CLEANUP A. Comply with Section 01710 Final Cleaning. 3.8 AS -BUILT DRAWINGS A. General 1 Prepare per Section 00700 General Conditions, and as follows. 2. Submit per Section 01011, Contract Time and Sequence. SECTION 01700 PAGE 3 CONTRACT CLOSEOUT B Format 1 Contractor shall provide one set of Diazo Sepia Mylars of Division A, M, and E drawings and two sets of blueline prints entitled "As -built Drawings." 2. In addition to the above, the Contractor shall provide an AutoCad computer file disk copy of Division A, C, M, and E As -built Drawings. This copy shall be based on the design drawing files provided by the Architect, updated by Contractor to show as -built information. 3 Make notations clearly legibly Accurately draft changes in the work. C Required Information 1 Significant changes made during construction. Identify source of changes. 2. Significant detail not shown in original Contract Documents. MAHLUM NORDFORS MclUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01700 PAGE 4 CONTRACT CLOSEOUT 3 Location of underground utilities and appurtenances as actually installed or encountered, referenced to permanent surface improvements. Show and locate changes in direction by dimension and elevation as utilities are actually installed. 4 Location of internal utilities and appurtenances concealed in building structure as actually installed or encountered, reference to visible and accessible features of the structures. D Distribution 1 Submit one copy to Architect. For records concerning mechanical and electrical work, submit direct to Architect's Consultant with transmittal letter copy to Architect. 2. Architect will return submittal for corrections as necessary 3 Architect will forward accepted submittal to Owner 3.9 FINAL ACCEPTANCE A. Requirements Prior to Final Acceptance 1 Contractor's submission of, and Architect's acceptance of, all record drawings and as- built drawings. 2. Submission and approval of warranties. 3 Issuance of final certificate of occupancy and submission of copies of all permits with signature of inspector indicating final approval, or equivalent, if not already obtained at time of substantial completion. 4 Final cleanup by the Contractor 5 Execution of all change orders. 6 Completion of all punch list items. B. Final Acceptance Process 1 When all items described above have been completed, the following are required. a. Architect's recommendation of final acceptance to the Owner b. Contractor's submission of final request for 100 percent payment and payment of retainage. Supporting documents shall include: 1) Affidavit for Payment of Retained Percentage per Section 01026, Payment Procedures. 2) Consent of Surety per Section 01026, Payment Procedures. 3) Contractor's Affidavit of Release of Liens per Section 01026, Payment Procedures. 4) Contractors Affidavit of Payment of Debts and Claims per Section 01026 Payment Procedures. 5) State of Washington Department of Revenue Certification. 6) Affidavit of wages paid in a form acceptable to the Owner Affidavit shall receive certification from the state of Washington, Department of Labor and Industries, prior to submission to Owner 7) In addition to the Affidavit of wages paid, copy of letter of release written by the state of Washington, Department of Labor and Industries to the Contractor MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01700 PAGE 5 CONTRACT CLOSEOUT C. Final Payment and Release of Retainage: Final payment and release of retainage shall be in accordance with the conditions of the contract upon final acceptance by the Owner and receipt of properly prepared invoice vouchers from the Contractor In any case, release of retainage will not occur until thirty (30) days after final acceptance by the Owner END OF SECTION 01700 MAHLUM NORDFORS McIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. This section specifies procedural requirements for final cleaning to occur at the end of each phase prior to Owner occupancy of completed work. B General cleaning during construction is required by Section 00700 General Conditions, and included in Section 01500 Construction Facilities and Temporary Controls. C. Cleaning required for specific trades of work is specified in sections pertaining to that trade of work. 1.4 QUALITY ASSURANCE A. Comply with Section 01400 Quality Control. 1.5 SCHEDULING A. Comply with Section 01310 Progress Schedule. PART 2 PRODUCTS (NOT USED) PART 3- EXECUTION D Materials producing flammable or harmful vapors are deemed inappropriate. 3.2 FINAL CLEANUP SECTION 01710 PAGE 1 FINAL CLEANING 3.1 GENERAL A. Employ experienced workers or professional cleaners for final cleaning. B. Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. C. Use only cleaning materials and methods recommended by manufacturer on surface to be cleaned. A. Upon completion of all other work under the contract, and prior to final acceptance, the Contractor shall be responsible for final cleanup of all work under this contract. B. Leave entire project perfectly clean and ready for occupancy All building and fixture surfaces shall be turned over to the Owner in a new condition, free of all damage, dust, dirt, spots, stains, encrustations, and other blemishes. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.5 COMPLIANCE SECTION 01710 PAGE 2 FINAL CLEANING C. Perform the following minimum cleaning operations after all trades have completed their work under this contract: 1 Vacuum entire interior. of project. 2. Clean all air ducts and ventilation equipment. 3 Hand dust and clean shelves and cabinets. 4 Remove labels that are not permanent. 5 Clean exposed exterior and interior hard- surfaced finishes to a dust -free condition, free of stains, films, and similar foreign substances. 6. Clean finish floors and floor coverings; wax when so specified. 7 Leave concrete floors broom clean. 8. Clean transparent materials, including mirrors and glass in doors and windows. Remove glazing compound and other substances that are noticeable vision obscuring materials. Replace chipped or broken glass and other damaged transparent materials. 9 Restore reflective surfaces to their original reflective condition. 10 Remove all protective coverings from all accessories furnished or installed. 11 Wipe surfaces of mechanical and electrical equipment. Remove excess lubrication and other substances. Clean plumbing fixtures to a sanitary condition. Clean light fixtures and lamps. D Contractor shall continue final cleanup as may be required by the punch list or other corrective work until such work is complete. 3.4 REMOVAL OF PROTECTION A. Remove temporary protection and facilities installed for protection of the work during construction. A. Comply with regulations of authorities having jurisdiction and safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on the Owner's property Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from the site and dispose of in a lawful manner B Where extra materials of value remaining after completion of associated work have become the Owner's property arrange for disposition of these materials as directed. 0 1997 Mahlon Nordfors McKinley Gordon END OF SECTION 01710 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. This section specifies administrative and procedural requirements for record documents. Record documents are defined as one set of construction documents kept on site for the purpose of recording changes to the project and uncovered conditions during the course of construction, as well as documenting approved products and colors. B. Work includes: 1 Record drawings 2. Record specifications 3 Record product data 4 Record sample submittals 5 Miscellaneous record submittals C. Related work specified elsewhere includes: 1 Section 01300 Submittals 2. Section 01700 Contract Closeout 1.4 SUBMITTALS A. Comply with Section 01300 Submittals. 1.5 QUALITY ASSURANCE A. Comply with Section 01400 Quality Control. 1.6 SCHEDULING A. Comply with Section 01310 Progress Schedule. PART 2 PRODUCTS (NOT USED). PART 3- EXECUTION SECTION 01720 PAGE 1 PROJECT RECORD DOCUMENTS 3.1 GENERAL A. Comply with Section 00700 General Conditions. B Maintain documents in good condition, available at all times for inspection by Architect and his consultants. C. Do not use for construction purposes. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Protect from deterioration and loss in a secure, fire resistive location. E. Make notations clearly and legibly Use color or other marking system for contrast. 3.2 RECORD DRAWINGS A. General 1 Keep records current. Do not permanently conceal any work until required information has been recorded. 2. Required information includes: a. Significant changes made during construction. Identify source of change. Mark each change with the associated COP or CCD b. Significant detail not shown in original contract documents. c. Location of underground utilities and appurtenances as actually installed or encountered, referenced to permanent surface improvements. Show and locate changes in direction by dimension and elevation as utilities are actually installed. d. Location of internal utilities and appurtenances concealed in building structure as actually installed or encountered, referenced to visible and accessible features of the structures. B. Format: Use one complete set of contract drawings titled "Project Record Drawings." C. Distribution 1 Submit one copy to Architect. For records concerning civil, structural, mechanical, and electrical work, submit directly to Architect's consultants with transmittal letter copy to Architect. 2. Architect will return submittal for corrections as necessary Contractor shall refer to corrected record drawings when preparing as -built drawings. 3 Architect will forward accepted submittal to Owner Contractor shall return corrected record drawings to Architect with as built drawing submittal. 3.3 RECORD SPECIFICATIONS A. General. Maintain one complete copy of the Project Manual, including addenda, and one copy of other written construction documents such as change orders and modifications issued in printed form during construction. Mark these documents to show substantial variations in actual work performed in comparison with the text of the specifications and modifications. Give particular attention to substitutions, selection of options, and similar information on elements that are concealed or cannot otherwise be readily discerned later by direct observations. Note related record drawing information and product data. B Format: Use one Project Manual titled "Project Record Specifications." C. Distribution 1 Submit one copy to Architect. 2. Architect will return submittal for corrections as necessary 3 Architect will forward accepted submittal to Owner SECTION 01720 PAGE 2 PROJECT RECORD DOCUMENTS MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 RECORD PRODUCT DATA A. General. Maintain one copy of each product data submittal. Mark these documents to show significant variations in 'actual work performed in comparison with information submitted. Include variations in products delivered to the site and from the manufacturer's installation instructions and recommendations. Give particular attention to concealed products and 13ortions of the work which cannot otherwise be readily discerned later by direct observation. Note related change order and markup of record drawings and specifications. B Format: Use one set of product data submittals titled "Project Record Product Data." C. Distribution. Upon completion of markup, submit complete set of record product data to the Architect for the Owner's records. 3.5 RECORD SAMPLE SUBMITTAL A. Immediately prior to the date or dates of substantial completion, the Contractor will meet at the site with the Architect and the Owner's personnel to determine which of the submitted samples that have been maintained during progress of the work are to be transmitted to the Owner for record purposes. Comply with delivery to the Owner's sample storage area. 3.6 MISCELLANEOUS RECORD SUBMITTALS A. Refer to other specification sections for requirements of miscellaneous record keeping and submittals in connection with actual performance of the work. Immediately prior to the date or dates of substantial completion, complete miscellaneous records and place in good order properly identified and bound or filed, ready for continued use and reference. Submit to the Architect for the Owner's records. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 01720 PAGE 3 PROJECT RECORD DOCUMENTS END OF SECTION 01720 MAHLUM NORDFORS McK NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 USE OF DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 REFERENCES A. A list of standards is located in Section 01091, Reference Standards. 1.3 DESCRIPTION A. Requirements 1 Comply with Section 00700 General Conditions. 2. Specific requirements for warranties for the work and products and installations that are specified to be warranted are included in the individual sections of Divisions 2 through 16 B Definitions C Types 1 Categories of warranties required for the work include: a. Special project warranty issued by Contractor and, where required, countersigned by installer or other recognized entity involved in performance of the work. b. Specified product warranty issued by a manufacturer or fabricator for compliance with requirements in contract documents. c. Coincidental product warranty available on a product incorporated into the work, by virtue of manufacturer's publication of warranty without regard for application requirements (nonspecified warranty). d. Refer to sections of Division 2 through 16 for requirements of specified warranties. D Disclaimers and Limitations 1.4 SUBMITTALS A. General 1 Prepare per Section 01300 Submittals, and as follows. SECTION 01745 PAGE 1 WARRANTY PROCEDURES 1 "Guarantee" and "warranty' are used interchangeably and are understood to mean the same thing. See Section 00700 General Conditions, for definition. 2. "Standard product warranties' are preprinted written warranties published by individual manufacturers for particular products and are specifically endorsed by the manufacturer to the Owner 3 'Special warranties" are written warranties required by or incorporated in the contract documents, either to extend time limits provided by standard warranties or to provide greater rights for the Owner 1 Manufacturer's disclaimers and limitations on product warranties do not relieve the Contractor of the warranty on the work that incorporates the products nor does it relieve suppliers, manufacturers, and subcontractors required to countersign special warranties with the Contractor MAIILUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 01745 PAGE 2 WARRANTY PROCEDURES 2. The Contractor's written warranty shall be submitted to the Architect on the "Contractor's Warranty' form attached to this section or in a similar format. 3 For subcontractor warranties as specified, a warranty by each such subcontractor, countersigned by the General Contractor shall be submitted to the Architect on the "Subcontractor's Warranty' form attached to this section or in a similar format. B Format 1 Bind each manual in a three -ring, heavy -duty vinyl, hardboard cover binder 2. On cover imprint title "Warranty Manual name of project, Owner, Architect; and date of substantial completion. 3 On bound edge, imprint name of project and owner and date of substantial completion. 4 Pages to be neat, clean sheets, 8 -1/2 by 11 -inch maximum size or accordion foldouts to same size. 5 Items to be identified with tabbed dividers showing name and number of appropriate specification sections. 6 Arrange dividers and items in order they occur in specifications. C Information Required 1 Table of contents identifying separate warranties by specification section number and name. 2 Contractor's warranty of the work per contract documents. 3 Warranties, certificates, and bonds for all portions of the work per specifications, Divisions 1 through 16 4 Certificate of occupancy obtained from appropriate building officials. D Distribution 1 Submit one preliminary copy to Architect for approval. 2. Upon approval of preliminary copy prepare and submit two final copies to Architect one for Architect and one for Owner 1.5 WARRANTY OBLIGATIONS A. Restore or remove and replace warranted work to its originally specified condition at such time during warranty as it does not comply with or fulfill terms of warranty Restore or remove and replace other work which has been damaged by failure of warranted work or which must be removed and replaced to gain access to warranted work. B. Except as otherwise indicated or required by governing regulations, warranties do not cover damage to building contents (other than work of contract) which results from failure of warranted work. C Cost of restoration or removal- and replacement is Contractor's obligation without regard to whether Owner has already benefited from use of failing work. D The Contractor shall warranty for a period of 1 year from the date of substantial completion all work performed under the provisions of the Agreement Between the Owner and Contractor 1.6 REINSTATEMENT OF WARRANTY A. Reinstatement of warranty shall be per Article 4.5 of the General Conditions of the Contract. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.7 OWNER'S RECOURSE SECTION 01745 PAGE 3 WARRANTY PROCEDURES A. Warranties and warranty periods do not diminish implied warranties and do not deprive Owner of actions, rights, and remedies otherwise available for Contractor's failure to fulfill requirements of the contract documents. Owner reserves right to reject coincidental product warranties considered to be conflicting with or detracting from requirements of the contract documents. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 01745 CONTRACTOR'S WARRANTY Date: General Contract Date: Owner Olympic Memorial Hospital Address: 939 Caroline Street e Port Angeles, WA 98362 Project: Olympic Memorial Hospital -2 Main/Surgery Additions Alterations (Contractor), the undersigned, warranties for a period of year(s) from the date of Certificate of Substantial Completions, all work performed under the provisions of the Agreement Between the Owner and Contractor (Contractor) will remedy any defects appearing during the warranty period which are due to failure, faulty materials, poor workmanship, or other nonconformity with or omission from the contract documents. The following subcontractors performed the work or furnished materials subject to warranty Trade Subcontractor and Address Phone Contact Person Contractor's Warranty Page 2 Trade Subcontractor and Address Phone Contact Person This warranty does not include holding the Contractor responsible for defects caused by abuse, modifications not executed by the Contractor improper or insufficient maintenance, improper operation, or wear and tear under normal usage (per Section 00700 General Conditions). Contractor- Address: Phone: Contact Person: Signature: (authorized representative) Trade: Subcontractor Address: Phone: Contact Person: Signature: Contractor Address: Signature: SUBCONTRACTOR'S WARRANTY Date: General Contract Date: Owner- Olympic Memorial Hospital Address: 939 Caroline Street Port Angeles, WA 98362 Project: Olympic Memorial Hospital -2 Main/Surgery Additions Alterations The General Contractor, and the Subcontractor warranty for a period of year (s), as specified in Section of the contract documents, all work performed under the provisions of the Agreement Between the Owner and the Contractor The undersigned will remedy any defects appearing during the warranty period which are due to failure, faulty materials, poor workmanship, or other nonconformity with or omission from the contract documents. This warranty does not include holding the Contractor responsible for defects caused by abuse, modifications not executed by the Contractor, improper or insufficient maintenance, improper operation, or wear and tear under normal usage (per Section 00700 General Conditions) (authorized representative) (authorized representative) MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS AND ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Provide materials, labor equipment, inspection, coordination, and supervision necessary for the safe and complete demolition work per industry standards of building and utility demolition as indicated in this specification and on the project drawings. B. This Section includes the following: 1 Demolition and removal of building portions. 2. Demolition and removal of structures. SECTION 02060 PAGE 1 BUILDING DEMOLITION C. Related Sections: The following Sections contain requirements that relate to this Section: 1 Division 1 Section `Construction Facilities and Temporary Controls' for temporary utilities, temporary construction and support facilities, temporary security and protection facilities, and environmental protection measures for demolition operations. 2. Division 2 Section `Site Clearing' for demolition of site improvements. 3 Division 2 Section `Selective Demolition' for interior demolition. 1.3 DEFINITIONS A. Existing to Remain. Protect construction indicated to remain against damage and soiling during demolition. When permitted by the Architect, items may be removed to a suitable, protected storage location during demolition and then cleaned and reinstalled in their original locations. 1.4 MATERIALS OWNERSHIP A. Except for items or materials indicated to be reused, salvaged, or otherwise indicated to remain the Owner's property demolished materials shall become the Contractor's property and shall be removed from the site with further disposition at the Contractor's option. 1.5 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections, for information only unless otherwise indicated. B Proposed dust control measures. C. Proposed noise control measures. D Schedule of demolition activities indicating the following: 1 Detailed sequence of demolition and removal work, with starting and ending dates for each activity 2. Dates for shutoff, capping, and continuation of utility services. F Photographs or videotape, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by demolition operations. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS AND ALTERATIONS 1.6 QUALITY ASSURANCE A. Demolition Firm Qualifications: Engage an experienced firm that has successfully completed demolition Work similar to that indicated for this Project. 1.7 PROJECT CONDITIONS SECTION 02060 PAGE 2 BUILDING DEMOLITION B. Regulatory Requirements: Comply with governing EPA notification regulations before starting demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. C. Predemolition Conference: Conduct conference at Project site to comply with pre installation conference requirements of Division 1 Section `Project Meetings' A. Building portions to be demolished will be vacated and their use discontinued before start of Work. B. Owner assumes no responsibility for actual condition of buildings to be demolished. C. Storage or sale of removed items or materials on -site will not be permitted. PART 2 PRODUCTS (NOT USED PART 3- EXECUTION 3.1 EXAMINATION A. Verify that utilities have been disconnected and capped. B. Survey existing conditions and correlate with requirements indicated to determine extent of demolition required. C. Survey the condition of the building to determine whether removing any element might result in a structural deficiency or unplanned collapse of any portion of the structure or adjacent structures during demolition. D Perform surveys as the Work progresses to detect hazards resulting from demolition activities. 3.2 UTILITY SERVICES A. Maintain existing utilities indicated to remain in service and protect them against damage during demolition operations. 1 Do not interrupt existing utilities serving occupied or operating facilities, except when authorized in writing by Owner and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to Owner and to governing authorities. 2. Provide not less than 72 hours notice to Owner if shutdown of service is required during changeover B. Utility Requirements: Locate, identify disconnect and seal or cap off indicated utility services serving structures to be demolished. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS AND ALTERATIONS 3.3 PREPARATION A. Conduct demolition operations and remove debris to ensure minimum interference with roads, streets, walks and other adjacent occupied and used facilities. 1 Do not close or obstruct streets, walks or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations. SECTION 02060 PAGE 3 BUILDING DEMOLITION B. Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of buildings to be demolished and adjacent buildings to remain. 1. Strengthen or add new supports when required during progress of demolition. 3.4 EXPLOSIVES A. Explosives: Use of explosives will not be permitted. 3.5 POLLUTION CONTROLS A. Use water mist, temporary enclosures, and other suitable methods to limit the spread of dust and dirt. Comply with governing environmental protection regulations. 1 Do not create hazardous or objectionable conditions, such as ice, flooding, and pollution, when using water B. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. 1 Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level. C. Clean adjacent buildings and improvements of dust, dirt, and debris caused by demolition operations. Return adjacent areas to condition existing before start of demolition. 3.11 DEMOLITION A. Building Demolition. Demolish building portions completely and remove from the site. Use methods required to complete Work within limitations of governing regulations and as follows: 1 Locate demolition equipment throughout the building and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing. 2. Dispose of demolished items and materials promptly On -site storage or sale of removed items is prohibited. 4 Demolish concrete and masonry in small sections. 5 Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation. 6 Break up and remove concrete slabs on grade, unless otherwise shown to remain. B. Damages: Promptly repair damages to adjacent facilities caused by demolition operations. 3.13 DISPOSAL OF DEMOLISHED MATERIALS A. General. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on -site. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS AND ALTERATIONS B. Burning: Do not burn demolished materials. e 0 1997 Mahlurn Nordfors McKinley Gordon SECTION 02060 PAGE 4 BUILDING DEMOLITION C. Disposal. Transport demolished materials off Owner's property and legally dispose of them. END OF SECTION 02060 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building. 2. Patching and repairs. SECTION 02070 PAGE 1 SELECTIVE DEMOLITION B. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 1 Section "Summary of Work" for use of the building and phasing requirements. 2. Division 1 Section "Cutting and Patching" for cutting and patching procedures for selective demolition operations. 3 Division 1 Section "Construction Facilities and Temporary Controls" for temporary utilities, temporary construction and support facilities, temporary security and protection facilities, and environmental protection measures for selective demolition operations. 4 Division 1 Section "Hazardous Materials Procedures" for abatement of hazardous materials 5 Division 1 Section "Contract Closeout" for record document requirements. 6 Division 6 Section "Rough Carpentry' for material and construction requirements for temporary enclosures. 7 Division 9 Section "Gypsum Board Assemblies" for material and construction requirements for temporary enclosures. 8. Division 15 Sections for cutting, patching, or relocating mechanical items. 9 Division 16 Sections for cutting, patching, or relocating electrical items. 1.3 DEFINITIONS A. Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the Owner's property B. Remove and Salvage: Items indicated to be removed and salvaged remain the Owner's property Remove, clean, and pack or crate items to protect against damage. Identify contents of containers and deliver to Owner's designated storage area. C. Remove and Reinstall. Remove items indicated; clean, service, and otherwise prepare them for reuse; store and protect against damage. Reinstall items in the same locations or in locations indicated. D Existing to Remain. Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by the Architect, items may be removed to a MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.4 MATERIALS OWNERSHIP 1.5 SUBMITTALS 1.7 PROJECT CONDITIONS PART 2- PRODUCTS 2.1 REPAIR MATERIALS SECTION 02070 PAGE 2 SELECTIVE DEMOLITION suitable, protected storage location during selective demolition and then cleaned and reinstalled in their original locations. A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain the Owner's property demolished materials shall become the Contractor's property and shall be removed from the site with further disposition at the Contractor's option. A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections, for information only unless otherwise indicated. B. Record drawings at Project closeout according to Division 1 Section "Contract Closeout." 1. Identify and accurately locate capped utilities and other subsurface structural, electrical, or mechanical conditions. C. Landfill records indicating receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes. 1.6 QUALITY ASSURANCE A. Demolition Firm Qualifications: Engage an experienced firm that has successfully completed selective demolition Work similar to that indicated for this Project. B Regulatory Requirements: Comply with governing EPA notification regulations before starting selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. A. Owner assumes no responsibility for actual condition of buildings to be selectively demolished. 1 Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical. B. Asbestos: If any materials suspected of containing asbestos are encountered, do not disturb the materials. Immediately notify the Owner 1 Asbestos will be surveyed and removed by Owner after wall finishes and framing are demolished. A. Use repair materials identical to existing materials. 1. Where identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. 2. Use materials whose installed performance equals or surpasses that of existing materials. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3- EXECUTION 3.1 EXAMINATION SECTION 02070 PAGE 3 SELECTIVE DEMOLITION A. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required. B. Inventory and record the condition of items to be removed and reinstalled and items to be .removed and salvaged. C. When unanticipated mechanical, electrical, or structural elements that conflict with the intended function or design are encountered, investigate and measure the nature and extent of the conflict. Promptly submit a written report to the Architect. D Survey the condition of the building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of the structure or adjacent structures during selective demolition. E. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities. 3.2 UTILITY SERVICES A. Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations. B Utility Requirements: Refer to Division 15 and 16 Sections for shutting off, disconnecting, removing, and sealing or capping utility services. Do not start selective demolition work until utility disconnecting and sealing have been completed and verified in writing. 3.3 PREPARATION A. Conduct demolition operations and remove debris to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities. 1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Owner and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations. B. Conduct demolition operations to prevent injury to people and damage,to adjacent buildings and facilities to remain. Ensure safe passage of people around selective demolition area. 1 Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction. 2. Protect existing site improvements, appurtenances, and landscaping to remain 3 Provide temporary weather protection, during interval between demolition and removal of existing construction, on exterior surfaces and new construction to ensure that no water leakage or damage occurs to structure or interior areas. C. Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of building to be selectively demolished. 1 Strengthen or add new supports when required during progress of selective demolition. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 POLLUTION CONTROLS SECTION 02070 PAGE 4 SELECTIVE DEMOLITION A. Use water mist, temporary enclosures, and other suitable methods to limit the spread of dust and dirt. Comply with governing environmental protection regulations. 1 Do not use water when it may damage existing construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution. B. Use enclosed chute and covered dumpster for debris removed via exterior opening. Carefully remove, store and protect any windows temporarily removed to provide access to exterior chute. Reinstall window per Division 8 Section Aluminum Windows." C. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas. D Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before start of selective demolition. 3.5 HAZARDOUS MATERIALS ABATEMENT COORDINATION. A. Initial demolition shall be limited to that necessary to expose existing piping and insulation, and expose existing carpet substrate to view 1 Remove wall and ceiling finishes and framing, casework, lighting and plumbing fixtures, and other work sufficiently to allow the Owner's abatement contractor unrestricted access to existing piping and insulation. 2. Do not disturb existing piping or insulation. If existing insulation is damaged, stop work and immediately notify Owner 3 Remove existing carpeting to expose pre- existing floor finishes. Do not disturb existing adhesives or substrate. 4 Mark locations on floor where slab will need to be core drilled for new plumbing and ductwork penetrations. B Allow sufficient time for the Owner's abatement contractor to survey analyze, and abate hazardous materials before resuming demolition. Refer to Division 1 Section Hazardous Materials Procedures. C. Upon written notification from the Owner, resume demolition of piping, flooring, and remaining work shown to be demolished. 3.6 SELECTIVE DEMOLITION A. Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete Work within limitations of governing regulations and as follows: 1 Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. To minimize disturbance of adjacent surfaces, use hand or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain. 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02070 PAGE 5 SELECTIVE DEMOLITION 2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces. 3 Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame cutting operations. Maintain portable fire- suppression devices during flame cutting operations. 4 Maintain adequate ventilation when using cutting torches. 5 Remove decayed, vermin infested, or otherwise dangerous or unsuitable materials and promptly dispose of off -site. 6. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation. 7 Locate selective demolition equipment throughout the structure and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing 8. Dispose of demolished items and materials promptly On -site storage or sale of removed items is prohibited. 9 Return elements of construction and surfaces to remain to condition existing before start of selective demolition operations. B. Demolish concrete and masonry in small sections. Cut concrete and masonry at junctures with construction to remain, using power driven masonry saw or hand tools; do not use power driven impact tools. C. Remove resilient floor coverings and adhesive according to recommendations of the Resilient Floor Covering Institute's (RFCI) "Recommended Work Practices for the Removal of Resilient Floor Coverings" and Addendum. 1 Remove residual adhesive and prepare substrate for new floor coverings by one of the methods recommended by RFCI. D Remove no more existing roofing than can be covered in one day by new roofing. See applicable Division 7 Section for new roofing requirements. E. Remove air conditioning equipment without releasing refrigerants. 3.7 PATCHING AND REPAIRS A. Promptly patch and repair holes and damaged surfaces caused to adjacent construction by selective demolition operations. B. Patching is specified in Division 1 Section "Cutting and Patching." C. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction to remain in a manner that eliminates evidence of patching and refinishing. 3.8 DISPOSAL OF DEMOLISHED MATERIALS A. General. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on -site. B Burning: Do not burn demolished materials. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 0 1996 Mahlum Nordfors McKinley Gordon SECTION 02070 PAGE 6 SELECTIVE DEMOLITION C. Disposal. Transport demolished materials off Owner's property and legally dispose of them. 3.9 CLEANING A. Sweep the building broom clean on completion of selective demolition operation. END OF SECTION 02070 MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Protection of existing trees indicated to remain. 2. Removal of trees and other vegetation. 3 Topsoil stripping. 4 Clearing and grubbing. 5 Removing above -grade improvements. 6. Removing below -grade improvements. 1.3 PROJECT CONDITIONS SECTION 02110 PAGE 1 SITE CLEARING A. Traffic: Conduct site clearing operations to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities. Do not close or obstruct streets, walks, or other occupied or used facilities without permission from Owner and authorities having jurisdiction. B. Protection of Existing Improvements: Provide protections necessary to prevent damage to existing improvements indicated to remain in place. 1 Protect improvements on adjoining properties and on Owner's property 2. Restore damaged improvements to their original condition, as acceptable to property owners. C. Protection of Existing Trees and Vegetation. Protect existing trees and other vegetation indicated to remain in place against unnecessary cutting, breaking or skinning of roots, skinning or bruising of bark, smothering of trees by stockpiling construction materials or excavated materials within drip line, excess foot or vehicular traffic, or parking of vehicles within drip line. Provide temporary guards to protect trees and vegetation to be left standing. 1. Water trees and other vegetation to remain within limits of contract work as required to maintain their health during course of construction operations. 2. Provide protection for roots over 1 -1/2 inch in diameter that are cut during construction operations. Coat cut faces with an emulsified asphalt or other acceptable coating formulated to use on damaged plant tissues. Temporarily cover exposed roots with wet burlap to prevent roots from drying out; cover with earth as soon as possible. 3 Repair or replace trees and vegetation indicated to remain that are damaged by construction operations in a manner acceptable to Architect. Employ a licensed arborist to repair damage to trees and shrubs. 4 Replace trees that cannot be repaired and restored to full- growth status, as determined by arborist. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS C. Relocation of Existing Trees: Carefully excavate the rootball of existing trees scheduled to be relocated, and replant per division 2 Section `Landscaping' Employ a licensed arborist to monitor the excavation, transport, and replanting of relocated trees. 1.4 EXISTING SERVICES A. General. Indicated locations are approximate; determine exact locations before commencing Work. B. Arrange and pay for disconnecting, removing, capping, plugging and relocating utility services. Notify affected utility companies in advance and obtain approval before starting this Work. SECTION 02110 PAGE 2 SITE CLEARING C. Place markers to indicate location of disconnected services. Identify service lines and capping locations on Project Record Documents. PART 2 PRODUCTS (NOT APPLICABLE) PART 3- EXECUTION 3.1 SITE CLEARING A. General. Remove trees, shrubs, grass, and other vegetation, improvements, or obstructions, as required, to permit installation of new construction. Remove similar items elsewhere on site or premises as specifically indicated. Removal includes digging out and off -site disposal of stumps and roots. 1 Cut minor roots and branches of trees indicated to remain in a clean and careful manner where such roots and branches obstruct installation of new construction. B. Topsoil. Topsoil is defined as friable sandy loam surface soil found in a depth of not less than 4 inches. Satisfactory topsoil is reasonably free of subsoil, clay lumps, stones, and other objects over 2 inches in diameter and without weeds, roots, and other objectionable material. 1 Strip topsoil to whatever depths encountered in a manner to prevent intermingling with underlying subsoil or other objectionable material. Remove heavy growths of grass from areas before stripping. a. Where existing trees are indicated to remain, leave existing topsoil in place within drip lines to prevent damage to root system. 2. Stockpile topsoil in storage piles off Owner's site. Construct storage piles to provide free drainage of surface water Cover storage piles, if required, to prevent wind erosion. 3 Dispose of unsuitable or excess topsoil as specified for disposal of waste material. C. Clearing and Grubbing: Clear site of trees, shrubs, and other vegetation, except for those indicated to be left standing. 1 Completely remove stumps, roots, and other debris protruding through ground surface. 2. Use only hand methods for grubbing inside drip line of trees indicated to remain. 3 Fill depressions caused by clearing and grubbing operations with satisfactory soil material, unless further excavation or earthwork is indicated. a. Place fill material in horizontal layers not exceeding 6 inches loose depth, and thoroughly compact each layer to a density equal to adjacent original ground. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02110 PAGE 3 SITE CLEARING 4 Relocate trees, shrubs, as indicated. Storage off site, protected as directed for installation. D Removal of Improvements: Remove existing above -grade and below -grade improvements as indicated and as necessary to facilitate new construction. .1 Abandonment or removal of certain underground pipe or conduits may be indicated on mechanical or electrical drawings and is included under work of related Division 15 and 16 Sections. Removing abandoned underground piping or conduits interfering with construction is included under this Section. 3.2 DISPOSAL OF WASTE MATERIALS A. Burning on Owner's Property Burning is not permitted on Owner's property B. Removal from Owner's Property Remove waste materials and unsuitable or excess topsoil from Owner's property 0 1997 Malilum Nordfors McKinley Gordon END OF SECTION 02110 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 02160 PAGE 1 EXCAVATION SUPPORT SYSTEMS A. Drawings and general provisions of Contract, including General and Supplementary bonditions and Division 1 Specification Sections, apply to this Section. B. Geotechnical Recommendations for Proposed Additions to the Olympic Memorial Hospital, Port Angeles, Washington dated March 11, 1997 prepared by Northwestern Territories, Inc. See Section 00220 Geotechnical Data. 1.2 SUMMARY A. This Section includes, but is not limited to, the following: 1 Shoring and bracing necessary to protect existing buildings, streets, walkways, utilities, and other improvements and excavation against loss of ground or caving embankments. 2. Maintenance of shoring and bracing. 3 Removal of shoring and bracing, as required. B. Scope: Furnish and supply all engineering, permits, materials, services and equipment required for proper shoring and underpinning and related safety measures to comply with all current applicable safety codes and practices. 1 Shoring and underpinning and related measures are the Contractor's responsibility 2. Shoring and underpinning including the required monitoring system for movement shall be designed by a professional engineer licensed to practice structural engineering in the State of Washington. The design shall utilize data provided in the project foundation investigation report Section 002200 C. Work includes, but is not limited to the following: 1 Bracing system to provide a completely clear excavation for building construction. 2. Permanent underpinning of existing structures. 3 Protection and support of adjacent utilities, sidewalks and streets. 4 Compliance with all of the requirements of the City of Port Angeles related to this work. 5 Removal of top of shoring piles to the depth required by these specifications D Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 0 Section Geotechnical Data' 2. Division 2 Section `Earthwork' for excavation and dewatering. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Layout drawings for excavation support system and other data prepared by or under the supervision of, a qualified professional engineer licensed to practice structural engineering in the State of Washington. System design and calculations must be acceptable to City of Port Angeles. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02160 PAGE 2 EXCAVATION SUPPORT SYSTEMS C. Submittals shall bear the professional seal of the design engineer and shall state the source of data upon which the design is based. D The Contractor will be responsible for obtaining required city permits and inspections related to this work. Copies of reports shall be sent directly to the Architect. 1.4 QUALITY ASSURANCE A. Engineer Qualifications: A professional engineer legally authorized to practice structural engineering in jurisdiction where Project is located, and experienced in providing successful engineering services for excavation support systems similar in extent required for this Project. B. Supervision. Engage and assign supervision of excavation support system to a qualified professional engineer foundation consultant. 1 Submit name of engaged consultant and qualifying technical experience. C. Shoring Monitoring: Conduct a systematic program of observations prior to and during project construction to measure deflection of the shoring wall system and determine the effects of construction on adjacent existing buildings and utilities. Monitoring shall be in the form of survey measurements. D Regulations: Comply with codes and ordinances of governing authorities having jurisdiction. 1.5 JOB CONDITIONS A. Examine the site, records of existing utilities, field logs of test borings and other conditions affecting the installation of shoring system. Check all possible conflicts between existing conditions and the installation of new pile shoring. Refer to Division 2 Section `Geotechnical Data. B. Before starting work, verify governing dimensions and elevations. Verify condition of adjoining properties. Take photographs to record any existing settlement or cracking of structures, pavements, and other improvements. Prepare a list of such damages, verified by dated photographs, and signed by Contractor and others conducting investigation. C. Survey adjacent structures and improvements, employing qualified professional engineer, establishing exact elevations at fixed points to act as benchmarks. Clearly identify benchmarks and record existing elevations. D During excavation, resurvey benchmarks weekly maintaining accurate log of surveyed elevations for comparison with original elevations. Promptly notify Architect if changes in elevations occur or if cracks, sags, or other damage is evident. 1.6 EXISTING UTILITIES A. Protect existing active sewer water, gas, electricity and other utility services and structures. B. Notify municipal agencies and service utility companies having jurisdiction. Comply with requirements of governing authorities and agencies for protection, relocation, removal, and discontinuing of services. 1 1 i 1 1 1 1 C. Shoring systems retaining earth on which the support or stability of existing strictures is dependent must be left in place at completion of work. 1 1 1 1 1 1 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 2 PRODUCTS 2.1 MATERIALS PART 3- EXECUTION 3.1 SHORING AND UNDERPINNING 3.3 SCHEDULING SECTION 02160 PAGE 3 EXCAVATION SUPPORT SYSTEMS A. General. Provide adequate shoring and bracing materials which will support loads imposed. Materials need not be new but should be in serviceable condition. B. Structural Steel. ASTM A 36 C. Driven sheet piling is prohibited. D All wood used in construction shall be pressure preservative treated in accordance with AWPA C -2 with Pentachlorophenol to a minimum retention of 0.5 pounds per cubic foot. A. Provide shoring and underpinning to protect and support existing and required utilities, buildings and foundations. B. Wherever shoring is required, locate the system to clear permanent construction and to permit forming and finishing of concrete surfaces. Provide shoring system adequately anchored and braced to resist earth and hydrostatic pressures. D During construction and until final completion of this contract the Contractor shall monitor the shoring to assure stability E. Cut-off piling designed to remain four feet below finish grade at completion of work. 3.2 BRACING A. Locate bracing to clear columns, floor framing construction, and other permanent work. If necessary to move a brace, install new bracing prior to removal of original brace. B Do not place bracing where it will be cast into or included in permanent concrete work, except as otherwise acceptable to Architect. C. Install internal bracing, if required, to prevent spreading or distortion of braced frames. D Maintain bracing until structural elements are supported by other bracing or until permanent construction is able to withstand lateral earth and hydrostatic pressures. E. Remove shoring and bracing in stages to avoid disturbance to underlying soils and damage to structures, pavements, facilities, and utilities. F Repair or replace, as acceptable to Architect, adjacent work damaged or displaced through installation or removal of shoring and bracing work. A. Provide bracing, shoring, and underpinning as required to maintain existing structure, utilities, roads, and other existing improvements that are indicated to remain. Also provide shoring as a MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS '0 1997 Mahlum Nordfors McKinley Gordon SECTION 02160 PAGE 4 EXCAVATION SUPPORT SYSTEMS Contractor's option to reduce excavation, and to keep truck access and fire lanes open as required by the City of Port Angeles. END OF SECTION 02160 1 f 1 1 1 1 1 1 1 1 1 1 t 1 1 MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY SECTION 02200 PAGE 1 EARTHWORK A. Drawings and general provisions of the Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. A. This Section includes the following: 1 Preparing and grading subgrades for slabs -on- grade, walks, pavements and landscaping. 2. Excavating and backfilling for buildings and structures. 3 Subbase course for walks and pavements. 4 Subsurface drainage backfill for walls and trenches. 5 Excavating and backfilling for underground mechanical and electrical utilities and appurtenances. B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 0 Section `Geotechnical Data' for excavation and fill recommendations. 2. Division 2 Section `Site Clearing' for site stripping, grubbing, topsoil removal, and tree protection. 3 Division 2 Section `Earthwork Support Systems' for shoring, underpinning and bracing. 4 Division 2 Section "Foundation Drainage Systems" for wall drainage. 5 Division 2 Section `Landscaping' for finish grading, including placing and preparing topsoil for lawns and planting. 6 Division 3 Section "Cast -In -Place Concrete" for concrete encasings, cradles, and appurtenances for utility systems. 7 Division 2 Section `Excavation Support Systems' for shoring and bracing. 8. Division 2 `Storm Sewerage and Sanitary Sewerage' for installation of storm sewer and sanitary sewer facilities. 1.3 DEFINITIONS A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed. B Subgrade: The uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, or topsoil materials. C. Borrow Soil material obtained off -site when sufficient approved soil material is not available from excavations. D Subbase Course: The layer placed between the subgrade and base course in a paving system or the layer placed between the subgrade and surface of a pavement or walk. E. Base Course: The layer placed between the subbase and surface pavement in a paving system. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02200 PAGE 2 EARTHWORK F Drainage Fill. Course of washed granular material supporting slab -on -grade placed to cut off upward capillary flow of pore water G. Unauthorized excavation consists of removing materials beyond indicated subgrade elevations or dimensions without direction by the Architect. Unauthorized excavation, as well as remedial work directed by the Architect, shall be at the Contractor's expense. H. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below ground surface. I. Utilities include on -site underground pipes, conduits, ducts, and cables, as well as underground services within building lines. 1.4 SUBMITTALS A. General. Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B Product data for the following: 1 Each type of plastic warning tape. 2. Filter Fabric. C. Samples of the following: 1 12 -by -12 -inch sample of filter fabric. 1.5 QUALITY ASSURANCE 1.6 PROJECT CONDITIONS A. Codes and Standards: Perform earthwork complying with requirements of authorities having jurisdiction. B Testing and Inspection Service: Owner will employ a qualified independent geotechnical engineering testing agency to classify proposed on -site and borrow soils to verify that soils comply with specified requirements and to perform required field and laboratory testing. C. Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings. 1 Before commencing earthwork, meet with representatives of the governing authorities, Owner Architect, consultants, Geotechnical Engineer, independent testing agency and other concerned entities. Review earthwork procedures and responsibilities including testing and inspection procedures and requirements. Notify participants at least 3 working days prior to convening conference. Record discussions and agreements and furnish a copy to each participant. A. Demolish and completely remove from site existing underground utilities indicated to be removed. Coordinate with utility companies to shutoff services if lines are active. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 2 PRODUCTS 2.1 SOIL MATERIALS SECTION 02200 PAGE 3 EARTHWORK A. General. Provide approved borrow soil materials from off -site when sufficient approved soil materials are not available from excavations. B. Satisfactory Soil Materials: ASTM D 2487 soil classification groups GW GP GM, SW SP and SM; free of rock or gravel larger than 2 inches in any dimension, debris, waste, frozen materials, vegetation and other deleterious matter C. Unsatisfactory Soil Materials: ASTM D 2487 soil classification groups GC, SC, ML, MH, CL, CH, OL, OH, and PT D Backfill and Fill Materials: Satisfactory soil materials. E. Subbase and Base Material. Per recommendations of Geotechnical Report in Division 0 Section Geotechnical Data. F Engineered Fill. Subbase or base materials. G. Bedding material shall be clean, sand gravel mixture free from organic matter and conforming to the following gradation when tested in accordance with ASTM D 422. 2.2 ACCESSORIES U.S. Percent Passing Standard Sieve Size 1 -inch 100 No. 4 25 -80 No. 200 0 -10 H. Drainage Fill. Washed, evenly graded mixture of crushed stone, or crushed or uncrushed gravel, ASTM D 448, coarse aggregate grading size 57 with 100 percent passing a 1 1/2 -inch sieve and not more than 5 percent passing a No. 8 sieve. I. Filtering Material. Evenly graded mixture of natural or crushed gravel or crushed stone and natural sand, with 100 percent passing a 1 -1/2 -inch sieve and 0 to 5 percent passing a No. 50 sieve. J Impervious Fill. Clayey gravel and sand mixture capable of compacting to a dense state. A. Filter Fabric: Manufacturer's standard nonwoven pervious geotextile fabric of polypropylene, nylon or polyester fibers, or a combination. 1 Provide filter fabrics that meet or exceed the listed minimum physical properties determined according to ASTM D 4759 and the referenced standard test method in parentheses: a. Grab Tensile Strength (ASTM D 4632) 1001b. b Apparent Opening Size (ASTM D 4751): #100 U.S. Standard sieve. c. Permeability (ASTM D 4491)• 150 gallons per minute per sq. ft. MAHLUM NORDFORS McKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION 3.1 PREPARATION SECTION 02200 PAGE 4 EARTHWORK A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations. B. Protect subgrades and foundation soils against freezing temperatures or frost. Provide protective insulating materials as necessary C. Provide erosion control measures to prevent erosion or displacement of soils and discharge of soil bearing water runoff or airborne dust to adjacent properties and walkways. D Tree protection is specified in the Division 2 Section `Site Clearing' 3.2 DEWATERING A. Prevent surface water and subsurface or ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area. B Protect subgrades and foundation soils from softening and damage by rain or water accumulation. Such water accumulation shall be removed. 3.3 EXCAVATION A. General. All trenches within 5 feet of footings or under footings shall be cut only after approval of the Architect. Bracing and shoring shall be provided where depth of excavation or character of ground render it necessary for personnel protection. Shoring shall be constructed per division 2 Section `Excavation Support Systems. Removal of bracing and shoring materials shall be done before backfilling except where necessary to insure against caving; in which case, it shall be withdrawn while backfilling is being done. Provide barricades around all excavation. Barricades to be securely constructed. The Contractor shall exercise extreme care while excavating in the area of utilities, carefully check for location of all possible utilities, whether shown on the drawings or not, and establish the location of all cut-off valves for ready shut -off of service in case of emergency The Contractor shall be completely responsible for all damage to any utilities caused in excavating as well as damage to personnel and property caused by said damaged utilities whether shown on the drawings or not. B Explosives: Do not use explosives. 3.4 STABILITY OF EXCAVATIONS A. Comply with local codes, ordinances, and requirements of authorities having jurisdiction to maintain stable excavations. MAHLUM NORDFORS MCKINLEY GORDON. OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.5 EXCAVATION FOR STRUCTURES SECTION 02200 PAGE 5 EARTHWORK A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 0 10 foot. Extend excavations a sufficient distance from structures for placing and removing concrete formwork, installing services and other construction, and for inspections. Excavations for Footings and Foundations: Do not disturb bottom of excavation. Excavate by hand to final grade just before placing concrete reinforcement. Trim bottoms to required lines and grades to leave solid base to receive other work. 2. Trench Excavations: Trenches shall be excavated to depth indicated or required to establish indicated slopes and invert elevations and to support bottom of piping or conduit on undisturbed soil. Trenches shall be of uniform width, sufficient to provide ample working room and a minimum of 6 to 9 inches of clearance on both sides of pipe or conduit. The bottoms of trenches shall be accurately graded to provide uniform bearing and support for the bottom quadrant of each section of the pipe. Bell holes shall be excavated to the necessary size at each joint or coupling to eliminate point bearing. Stones of 3 inches or greater in any dimension, or as recommended by the pipe manufacturer whichever is smaller, shall be removed to avoid point bearing. Where unyielding material is encountered in the bottom of the trench, such material shall be removed 6 inches below the required grade and replaced with materials described below for bedding. During excavation, material satisfactory for backfilling shall be stockpiled in an orderly manner at a distance from the banks of the trench equal to half the depth of the excavation, but in no instance closer than 2 feet. Excavated material not required or not satisfactory for backfill shall be removed from the site and shall be disposed of in designated areas approved for surplus material storage. 3 Drainage Structure Excavations: Excavation for manholes, catch basins, inlets, or similar structures shall be sufficient to leave at least 12 inches clear between the outer structure surfaces and the face of the excavation or support members. When concrete or masonry is to be places in an excavated area, special care shall be taken not to disturb the bottom .of the excavation. Excavation to the final grade level shall not be made until just before the concrete or masonry is to be placed. 3.6 EXCAVATION FOR WALKS AND PAVEMENTS A. Excavate surfaces under walks and pavements to indicated cross sections, elevations, and grades. 3.7 APPROVAL OF SUBGRADE A. Notify Architect/Engineer when excavations have reached required subgrade. B When Architect/Engineer determines that unforeseen unsatisfactory soil is present, continue excavation and replace with compacted backfill or fill material as directed. 1 Unforeseen additional excavation and replacement material will be paid according to the Contract provisions for changes in Work. C. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water or construction activities, as directed by the Architect. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.8 UNAUTHORIZED EXCAVATION A. Fill unauthorized excavation under foundations or wall footings by extending indicated bottom elevation of concrete foundation or footing to excavation bottom, without altering required top elevation. Lean concrete fill may be used to bring elevations to proper position when acceptable to the Architect. 1 Fill unauthorized excavations under other construction as directed by the Architect. B Where indicated widths of utility trenches are exceeded, provide stronger pipe, or special installation procedures, as required by the Architect. 3.9 STORAGE OF SOIL MATERIALS SECTION 02200 PAGE 6 EARTHWORK A. Stockpile excavated materials acceptable for bacld'ill and fill soil materials, including acceptable borrow materials. Stockpile soil materials without intermixing. Stockpile soil materials off Owner's property 3.10 BACKFILL A. Backfill excavations promptly but not before completing the following: 1 Acceptance of construction below finish grade including, where applicable, dampproofing, waterproofing, and perimeter insulation. 2. Measuring and recording locations of underground utilities for record documents. 3 Testing, inspecting, and approval of underground utilities. 4 Concrete formwork removal. 5 Removal of trash and debris from excavation. 6 Removal of temporary shoring and bracing, and sheeting. 7 Installing permanent or temporary horizontal bracing on horizontally supported walls. S. No underground lines shall be covered until the installation has been approved by the inspector having jurisdiction and the Owner 3.11 SUBSURFACE DRAINAGE BACKFILL A. Subsurface Drain. Place a layer of filter fabric around perimeter of drainage trench or at footing, as indicated. Place a 6 -inch compacted course of filtering material on filter fabric to support drainage pipe. After installing and testing, encase drainage pipe in a minimum of 6 inches of compacted filtering material and wrap in filter fabric, overlapping edges at least 6 inches. B Drainage Backfill. Place and compact drainage backfill of filtering material over subsurface drain, in width indicated, to within 12 inches of final subgrade. Overlay drainage backfill with one layer of filter fabric, overlapping edges at least 6 inches. C. Impervious Fill. Place and compact impervious fill material over drainage backfill to final subgrade. 3.12 FILL A. Preparation. Remove vegetation, topsoil, debris, wet, and unsatisfactory soil materials, obstructions, and deleterious materials from ground surface prior to placing fills. 1 Plow strip, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so fill material will bond with existing surface. 1 MAHLUM NORDFORS MCKINLEY GORDON, OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS B When subgrade or existing ground surface to receive fill has a density less than that required for fill, break up ground surface to depth required, pulverize, moisture condition or aerate soil and recompact to required density C. Place fill material in layers to required elevations for each location listed below Under grass, use satisfactory excavated or borrow soil material. 2. Under walks and pavements, use subbase or base material, or satisfactory excavated or borrow soil material. 3 Under steps and ramps, use subbase material. 4 Under building slabs, use drainage fill material. 5 Under footings and foundations, use engineered fill. 3.13 MOISTURE CONTROL SECTION 02200 PAGE 7 EARTHWORK A. Uniformly moisten or aerate subgrade and each subsequent fill or backfill layer before compaction to within 2 percent of optimum moisture content. 1 Do not place backfill or fill material on surfaces that are muddy frozen, or contain frost or ice. 3.15 GRADING 2. Remove and replace, or scarify and air-dry satisfactory soil material that is too wet to compact to specified density a. Stockpile or spread and dry removed wet satisfactory soil material. 3.14 COMPACTION A. Place backfill and fill materials per recommendations in Geotechnical Report in division 2 Section Geotechnical Data. B Place backfill and fill materials evenly on all sides of structures to required elevations. Place backfill and fill uniformly along the full length of each structure. C Bedding material shall be phased to a depth of 6 inches (6 over the top of piping. The bedding shall be brought up evenly on both sides of the pipe for the full length of the pipe. D Percentage of Maximum Dry Density Requirements: Compact soil per recommendations in Geotechnical Report in division 2 Section Geotechnical Data' and per drawings and notes in Civil Drawings. A. General. Uniformly grade areas to a smooth surface, free from irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevations indicated. 1 Provide a smooth transition between existing adjacent grades and new grades. 2. Cut out soft spots, fill low spots, and trim high spots to conform to required surface tolerances. B Site Grading: Slope grades to direct water away from buildings and to prevent ponding. Finish subgrades to required elevations within the following tolerances: 1 Lawn or Unpaved Areas: Plus or minus 0 10 foot. 2. Walks: Plus or minus 0 10 foot. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3 Pavements: Plus or minus 1/2 inch. SECTION 02200 PAGE 8 EARTHWORK C. Grading Inside Building Lines: Finish subgrade to a tolerance of 1/2 inch when tested with a 10 -foot straightedge. 3.16 SUBBASE AND BASE COURSES 1. A. Under pavements and walks, place subbase course material on prepared subgrades. Place base course material over subbases to pavements. 1 Compact subbase and base courses per recommendations in Geotechnical Report in division 2 Section Geotechnical Data and per drawings and notes in Civil Drawings. 2. Shape subbase and base to required crown elevations and cross -slope grades. 3.17 DRAINAGE FILL A. Under slabs -on- grade, place drainage fill course on prepared subgrade. 1 Compact drainage fill to required cross sections and thickness. 2. Compact subbase per recommendations in Geotechnical Report in division 2 Section Geotechnical Data' and per drawings and notes in Civil Drawings. 3.18 FIELD QUALITY CONTROL A. Testing Agency Services: Allow testing agency to inspect and test each subgrade and each fill or backfill layer Do not proceed until test results for previously completed work verify compliance with requirements. 1 Perform field in -place density tests according to ASTM D 1556 (sand cone method), ASTM D 2167 (rubber balloon method), or ASTM D 2937 (drive cylinder method), as applicable. 2. Footing Subgrade• At footing subgrades, perform at least one test of each soil stratum to verify design bearing capacities. Subsequent verification and approval of other footing subgrades may be based on a visual comparison of each subgrade with related tested strata when acceptable to the Architect. 3 Paved and Building Slab Areas: At subgrade and at each compacted fill and backfill layer perform at least one field in -place density test for every 2,000 sq. ft. or less of paved area or building slab, but in no case fewer than three tests. 4 Foundation Wall Backfill. In each compacted backfill layer, perform at least one field in -place density test for each 100 feet or less of wall length, but no fewer than two tests along a wall face. B. When testing agency reports that subgrades, fills, or back ills are below specified density the Contractor will. Scarify and moisten or aerate, or remove and replace soil to the depth required, recompact and retest until required density is obtained, at the Contractor's expense. 3.19 PROTECTION A. Protecting Graded Areas: Protect newly graded areas from traffic, freezing, and erosion. Keep free of trash and debris. B Repair and re- establish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settled, or lose compaction due to subsequent construction operations or weather conditions. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON. OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02200 PAGE 9 EARTHWORK 1 Scarify or remove and replace material to depth directed by the Architect; reshape and recompact at optimum moisture content to the required density C. Settling: Where settling occurs during the Project correction period, remove finished surfacing, backfill with additional approved material, compact, and reconstruct surfacing. Restore appearance, quality and condition of finished surfacing to match adjacent work, and eliminate evidence of restoration to the greatest extent possible. 3.20 DISPOSAL OF SURPLUS AND WASTE MATERIALS A. Disposal. Remove surplus and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off the Owner's property 01997 Mahhan Nordfors McKinley Gordon END OF SECTION 02200 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary c onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY 1.3 SUBMITTALS SECTION 02511 PAGE 1 HOT -MIXED ASPHALT PAVING A. This Section includes provisions for hot -mixed asphalt paving over prepared subbase. Proof rolling of prepared subbase is included in this Section. B. Related Sections: 1 Division 2 section `Excavation' for prepared subbase. 2. Division 2 section `Site Clearing' for saw- cutting of edges of existing pavement A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Material Certificates signed by material producer and Contractor, certifying that each material item complies with or exceeds specified requirements. C. Pavement marking plan indicating lane separations and defined parking spaces. Note dedicated handicapped spaces with international graphics symbol. 1.4 SITE CONDITIONS A. Weather Limitations: Apply prime and tack coats when ambient temperature is above 50 deg F (10 deg C) and when temperature has not been below 35 deg F (1 deg C) for 12 hours immediately prior to application. Do not apply when base is wet or contains an excess of moisture. B. Construct hot -mixed asphalt surface course when atmospheric temperature is above 40 deg F (4 deg C) and when base is dry Base course may be placed when air temperature is above 30 deg F (minus 1 deg C) and rising. C. Grade Control. Establish and maintain required lines and elevations. PART 2 PRODUCTS 2.1 MATERIALS A. General. Use locally available materials and gradations that exhibit a satisfactory record of previous installations. B Coarse Aggregate: Sound, angular crushed stone, crushed gravel, or properly cured crushed blast furnace slag, complying with ASTM D 692 -88. C. Fine Aggregate: Sharp -edged natural sand or sand prepared from stone, properly cured blast furnace slag, gravel, or combinations thereof, complying with ASTM D 1073 D Mineral Filler Rock or slag dust, hydraulic cement, or other inert material complying with ASTM D 242. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02511 PAGE 2 HOT -MIXED ASPHALT PAVING E. Asphalt Cement: ASTM D 3381 for viscosity- graded material, ASTM D 946 for penetration- graded material. F Prime Coat: Cut -back asphalt type, ASTM D 2027 MC -30, MC -70 or MC 250 G. Tack Coat: Emulsified asphalt; ASTM D 977 H. Herbicide Treatment: Commercial chemical for weed control, registered by Environmental Protection Agency Provide granular, liquid, or wetable powder form. 1 Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the work include, but are not limited to, the following: 2. Manufacturers: Subject to compliance with requirements, provide products of one of the following: a. Ciba -Geigy Corp. b. Dow Chemical U.S.A. c. E.I. Du Pont de Nemours Co. Inc. d. FMC Corp. e. Thompson- Hayward Chemical Co. f. U.S. Borax and Chemical Corp. I. Lane Marking Paint: Alkyd -resin type, ready -mixed complying with AASHTO M 248, Type I. 1 Color White. 2. Width. 4 inches. J Wheel Stops: 2,500 -psi compressive strength precast, air entrained concrete, approximately 6 inches high, 9 inches wide, and 7 feet long. Provide chamfered corners and drainage slots on underside. 2.2 ASPHALT AGGREGATE MIXTURE A. Provide plant- mixed, hot -laid asphalt- aggregate mixture complying with ASTM D 3515 and as recommended by local paving authorities to suit project conditions. PART 3 EXECUTION 3.1 SURFACE PREPARATION A. General. Remove loose material from compacted subbase surface immediately before applying herbicide treatment or prime coat. B. Proof -roll prepared subbase surface to check for unstable areas and areas requiring additional compaction. C. Notify Contractor of unsatisfactory conditions. Do not begin paving work until deficient subbase areas have been corrected and are ready to receive paving. D Herbicide Treatment: Apply chemical weed control agent in strict compliance with manufacturer's recommended dosages and application instructions. Apply to compacted, dry subbase prior to application of prime coat. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS E. Prime Coat: Apply at rate of 0.20 to 0.50 gal. per sq. yd. over compacted subgrade. Apply material to penetrate and seal, but not flood, surface. Cure and dry as long as necessary to attain penetration and evaporation of volatile. F Tack Coat: Apply to contact surfaces of previously constructed asphalt or Portland cement concrete and surfaces abutting or projecting into hot -mixed asphalt pavement. Distribute at rate of 0 05 to 0 15 gal. per sq. yd. of surface. G. Allow to dry until at proper condition to receive paving. H. Exercise care in applying bituminous materials to avoid smearing of adjoining concrete surfaces. Remove and clean damaged surfaces. 3.2 PLACING MIX SECTION 02511 PAGE 3 HOT -MIXED ASPHALT PAVING A. General. Place hot -mixed asphalt mixture on prepared surface, spread, and strike off. Spread mixture at minimum temperature of 225 deg F (107 deg C). Place areas inaccessible to equipment by hand. Place each course to required grade, cross section, and compacted thickness. B. Paver Placing: Place in strips not less than 10 feet wide, unless otherwise acceptable to Architect. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Complete base course for a section before placing surface course. C. Immediately correct surface irregularities in finish course behind paver Remove excess material forming high spots with shovel or lute. D Joints: Make joints between old and new pavements, or between successive days' work, to ensure continuous bond between adjoining work. Construct joints to have same texture, density and smoothness as other sections of hot -mixed asphalt course. Clean contact surfaces and apply tack coat. E. Curbs: Construct curbs over compacted pavement surfaces. Apply a light tack coat unless pavement surface is still tacky and free from dust. F Place curb materials to cross section indicated or if not indicated, to local standard shapes, by machine or by hand in wood or metal forms. Tamp hand placed materials and screed to smooth finish. Remove forms as soon as material has cooled. 3.3 ROLLING A. General. Begin rolling when mixture will bear roller weight without excessive displacement. B. Compact mixture with hot hand tampers or vibrating plate compactors in areas inaccessible to rollers. C. Breakdown Rolling: Accomplish breakdown or initial rolling immediately following rolling of joints and outside edge. Check surface after breakdown rolling and repair displaced areas by loosening and filling, if required, with hot material. D Second Rolling: Follow breakdown rolling as soon as possible, while mixture is hot. Continue second rolling until mixture has been evenly compacted. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.5 WHEEL STOPS 3.6 FIELD QUALITY CONTROL SECTION 02511 PAGE 4 HOT -MIXED ASPHALT PAVING E. Finish Rolling: Perform finish rolling while mixture is still warm enough for removal of roller marks. Continue rolling until roller marks are eliminated and course has attained 95 percent laboratory density F Patching: Remove and replace paving areas mixed with foreign materials and defective areas. Cut out such areas and fill with fresh, hot hot -mixed asphalt. Compact by rolling to specified surface density and smoothness. G. Protection. After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened. H. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked. 3.4 TRAFFIC AND LANE MARKINGS A. Cleaning: Sweep and clean surface to eliminate loose material and dust. B. Striping: Use chlorinated- rubber base traffic lane- marking paint, factory- mixed, quick drying, and nonbleeding. C. Do not apply traffic and lane marking paint until layout and placement have been verified with Architect. D Apply paint with mechanical equipment to produce uniform straight edges. Apply at manufacturer's recommended rates to provide minimum 12 to 15 mils dry thickness. A. General. Secure wheel stops to hot -mixed asphalt surface with not less than two 3/4 -inch- diameter galvanized steel dowels embedded in precast concrete at 1/3 points. Size length of dowel to penetrate at least 1/2 hot -mixed asphalt depth. A. General. Testing in -place hot -mixed asphalt courses for compliance with requirements for thickness and surface smoothness will be done by Owner's testing laboratory Repair or remove and replace unacceptable paving as directed by Architect. B. Thickness: In -place compacted thickness tested in accordance with ASTM D 3549 will not be acceptable if exceeding following allowable variations: 1 Base Course: Plus or minus 1/2 inch. 2. Surface Course: Plus or minus 1/4 inch. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02511 PAGE 5 HOT -MIXED ASPHALT PAVING C. Surface Smoothness: Test finished surface of each hot -mixed asphalt course for smoothness, using 10 -foot straightedge applied parallel with and at right angles to centerline of paved area. Surfaces will not be acceptable if exceeding the following tolerances for smoothness: 1 Base Course Surface: 1/4 inch. 2. Wearing Course Surface: 3/16 inch. 3 Crowned Surfaces: Test with crowned template centered and at right angle to crown. Maximum allowable variance from template is 1/4 inch. D Check surface areas at intervals as directed by Architect. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 02511 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.2 SUMMARY SECTION 02520 PAGE 1 PORTLAND CEMENT CONCRETE PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. A. This Section includes exterior portland cement concrete paving for the following: 1 Curbs and gutters. 2. Walkways. B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 2 Section "Earthwork" for subgrade preparation, grading and subbase course. 2. Division 3 Section "Cast -in -Place Concrete" for general building applications of concrete. 3 Division 7 Section "Paving Joint Sealants" for joint fillers and sealants within concrete paving and at joints with adjacent construction. 1.3 SUBMITTALS A. General. Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B Product data for proprietary materials and items, including reinforcement and forming accessories, admixtures, joint systems, curing compounds, dry-shake finish materials, and others if requested by Architect. C. Design mixes for each class of concrete. Include revised mix proportions when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments. D Laboratory test reports for evaluation of concrete materials and mix design tests. E. Material certificates in lieu of material laboratory test reports when permitted by Architect. Material certificates shall be signed by manufacturer and Contractor certifying that each material item complies with or exceeds requirements. Provide certification from admixture manufacturers that chloride content complies with requirements. F Minutes of preinstallation conference. 1.4 QUALITY ASSURANCE A. Concrete Standards: Comply with provisions of the following standards, except where more stringent requirements are indicated. 1 American Concrete Institute (ACI) 301, "Specifications for Structural Concrete for Buildings." 2. ACI 318, "Building Code Requirements for Reinforced Concrete." 3 Concrete Reinforcing Steel Institute (CRSI) "Manual of Standard Practice." MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02520 PAGE 2 PORTLAND CEMENT CONCRETE PAVING B. Concrete Manufacturer Qualifications: Manufacturer of ready -mixed concrete products complying with ASTM C 94 requirements for production facilities and equipment. C. Concrete Testing Service: Engage a qualified independent testing agency to perform materials evaluation tests and to design concrete mixes. D Fietd-Constructed Mockup: Cast mockup of size indicated or as required to demonstrate typical joints, surface finish, texture, color, and standard of workmanship. 1 When Architect determines that mockup does not meet requirements, demolish and remove it from the site and cast another until the mockup is accepted. 2. Keep accepted mockup undisturbed during construction as a standard for judging completed paving. Undamaged mockup may be incorporated into the Work. 3 Demolish accepted mockup and remove from site when directed by Architect. E. Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings" and the following: 1 Before installing portland cement concrete paving, meet with representatives of authorities having jurisdiction, Owner, Architect, consultants, independent testing agency and other concerned entities to review requirements. Notify participants at least 3 working days before conference. 1.5 PROJECT CONDITIONS A. Traffic Control. Maintain access for vehicular and pedestrian traffic as required for other construction activities. PART 2- PRODUCTS 2.1 FORMS A. Form Materials: Plywood, metal, metal -framed plywood, or other acceptable panel type materials to provide full- depth, continuous, straight, smooth exposed surfaces. 1 Use flexible or curved forms for curves of a 100 -foot or less radius. B Form Release Agent: Provide commercial formulation form release agent with a maximum of 350 g/L volatile organic compounds (VOCs) that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. 2.2 REINFORCING MATERIALS A. Reinforcing Bars and Tie Bars: ASTM A 615 Grade 60 deformed. B Epoxy Coated Reinforcing Bars: ASTM A 775 with ASTM A 615 Grade 60 deformed steel bars. C. Plain, Cold -Drawn Steel Wire: ASTM A 82. D Welded Steel Wire Fabric: ASTM A 185 1 Furnish in flat sheets, not rolls, unless otherwise acceptable to Architect. E. Deformed -Steel Welded Wire Fabric: ASTM A 497 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAFILUM NORDFORS McIONNLEY GORDON OLYMPIC MEMORIAL IIOSPTTAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02520 PAGE 3 PORTLAND CEMENT CONCRETE PAVING F Fabricated Bar Mats: Welded or clip assembled steel bar mats, ASTM A 184 Use ASTM A 615 Grade 60 steel bars, unless otherwise indicated. G. Joint Dowel Bars: Plain steel bars, ASTM A 615 Grade 60 Cut bars true to length with ends square and free of burrs. H. poxy-Coated Joint Dowel Bars: ASTM A 775 with ASTM A 615 Grade 60 plain steel bars. I. Hook Bolts: ASTM A 307 Grade A bolts, internally and externally threaded. Design hook bolt joint assembly to hold coupling against pavement form and in position during concreting operations, and to permit removal without damage to concrete or hook bolt. J Supports for Reinforcement: Chairs, spacers, dowel bar supports and other devices for spacing, supporting, and fastening reinforcing bars, welded wire fabric, and dowels in place. Use wire bar -type supports complying with CRSI specifications. 1 Use supports with sand plates or horizontal runners where base material will not support chair legs. 2.3 CONCRETE MATERIALS A. Portland Cement: ASTM C 150 Type I. 1 Use one brand of cement throughout Project unless otherwise acceptable to Architect. B. Fly Ash: ASTM C 618, Type F C. Normal- Weight Aggregates: ASTM C 33 Class 4 and as follows. Provide aggregates from a single source. 1 Maximum Aggregate Size: 1 -1/2 inches. 2. Do not use fine or coarse aggregates that contain substances that cause spalling. 3 Local aggregates not complying with ASTM C 33 that have been shown to produce concrete of adequate strength and durability by special tests or actual service may be used when acceptable to Architect. D Water Potable. E. Fiber Reinforcement: Synthetic fibers engineered and designed for secondary reinforcement of concrete slabs, complying with ASTM C 1116, Type III. 2.4 ADMIXTURES A. Provide concrete admixtures that contain not more than 0 1 percent chloride ions. B. Air- Entraining Admixture: ASTM C 260, certified by manufacturer to be compatible with other required admixtures. C. Water Reducing Admixture: ASTM C 494 Type A. D High -Range Water Reducing Admixture: ASTM C 494 Type F or Type G. E. Water- Reducing and Accelerating Admixture: ASTM C 494 Type E. F Water Reducing and Retarding Admixture: ASTM C 494 Type D MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02520 PAGE 4 PORTLAND CEMENT CONCRETE PAVING G. Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: H. Products: Subject to compliance with requirements, provide one of the following: 1. Air- Entraining Admixture: a. Air -Tite or Amex 210• Cormix Construction Chemicals. b. Air -Mix or Perma-Air Euclid Chemical Co. c. Darex AEA or Daravair; W.R. Grace Co. d. MB -VR or Micro-Air Master Builders, Inc. e. Sealtight AEA, W.R. Meadows, Inc. f. Sika AER, Sika Corp. 2. Water Reducing Admixture: a. Chemtard; ChemMasters Corp. b. Type A Series; Cormix Construction Chemicals. c. Eucon WR -75 Euclid Chemical Co. d. WRDA, W.R. Grace Co. e. Pozzolith Normal or Polyheed; Master Builders, Inc. f. Metco W.R Metalcrete Industries. g. Plastocrete 161 Sika Corp. 3 High -Range Water Reducing Admixture: a. Super P Anti -Hydro Co. Inc. b. Cormix 2000 PSI Super or Melmet; Cormix Construction Chemicals. c. Eucon 37 Euclid Chemical Co. d. WRDA 19 or Daracem; W.R. Grace Co. e. Rheobuild or Polyheed; Master Builders, Inc. f. Superslump; Metalcrete Industries. g. Sikament 300; Sika Corp. 1 4 Water Reducing and Accelerating Admixture: a. Q -Set; Conspec Marketing Manufacturing Co. b. Gilco Accelerator or Lub NCA, Cormix Construction Chemicals. c. Accelguard 80• Euclid Chemical Co. d. Daraset; W.R. Grace Co. e. Pozzutec 20• Master Builders, Inc. f. Accel -Set; Metalcrete Industries. 5 Water Reducing and Retarding Admixture: a. Type D Series; Cormix Construction Chemicals. b. Eucon Retarder 75 Euclid Chemical Co. c. Daratard -17 W.R. Grace Co. d. Pozzolith R, Master Builders, Inc. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.5 CURING MATERIALS e. Plastiment; Sika Corporation. SECTION 02520 PAGE 5 PORTLAND CEMENT CONCRETE PAVING A. Absorptive Cover Burlap cloth made from jute or kenaf, weighing approximately 9 oz. per sq. yd. complying with AASHTO M 182, Class 2. B Moisture- Retaining Cover One of the following, complying with ASTM C 171 1 Waterproof paper 2. Polyethylene film. 3 White burlap polyethylene sheet. C. Clear Solvent -Borne Liquid Membrane Forming Curing Compound. ASTM C 309 Type I, Class A or B, wax free. D Clear Waterborne Membrane Forming Curing Compound. ASTM C 309 Type I, Class B. 1 Provide material that has a maximum volatile organic compound (VOC) rating of 350 8/ E. Evaporation Control. Monomolecular film forming compound applied to exposed concrete slab surfaces for temporary protection from rapid moisture loss. F Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: G. Products: Subject to compliance with requirements, provide one of the following: 1 Clear Solvent -Borne Liquid Membrane Forming Curing Compound. a. Clear Cure; Anti-Hydro Co. Inc. b. Spartan-Cote; The Burke Co. c. All Resin; Conspec Marketing Mfg. Co. d. Sealco 309• Cormix Construction Chemicals. e. Day -Chem Cure and Seal; Dayton Superior Corp. f. Diamond Clear Euclid Chemical Co. g. #64 Resin Cure-Clear Lambert Corp. h. L&M Cure R, L&M Construction Chemicals, Inc. i. Masterkure; Master Builders, Inc. j. 3100 Series; W.R. Meadows, Inc. k. Seal N Kure; Metalcrete Industries. 1. Kure-N -Seal, Sonnebom- Chemrex. m. Horn Clear Seal, Tamms/A.C. Horn. 2. Clear Waterborne Membrane Forming Curing Compound. a. Clear Cure Water Base; Anti-Hydro Co. Inc. b Spartan Cote WB; The Burke Co. c. W.B. Resin Cure; Conspec Marketing and Mfg. Co. d. Sealco VOC; Connix Construction Chemicals. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS e. Safe Cure and Seal (J -18); Dayton Superior Corp. f. Diamond Clear VOX, Euclid Chemical Co. g. Aqua Kure-Clear Lambert Corp. h. Dress Seal #22 WB; L&M Construction Chemicals, Inc. i. Masterkure 100W Master Builders, Inc. j. 1100 Clear Series; W.R. Meadows, Inc. k. Metcure; Metalcrete Industries. 1. Kure -N -Seal WB; Sonnebom- Chemrex. m. Homcure 100• Tamms/A.C. Horn. 3 Evaporation Control. a. Aquafilm; Conspec Marketing and Mfg. Co. b. Eucobar• Euclid Chemical Co. c. E -Con; L&M Construction Chemicals, Inc. d. Confilm, Master Builders, Inc. e. Waterhold; Metalcrete Industries. 2.6 RELATED MATERIALS SECTION 02520 PAGE 6 PORTLAND CEMENT CONCRETE PAVING A. Boiled Linseed Oil Mixture: Combination of boiled linseed oil and mineral spirits, complying with AASHTO M -233 B Traffic Paint: Alkyd -resin ready -mixed, complying with AASHTO M 248, Type S. 1 Color White. 2. Color Yellow C. Nonslip Aggregate Finish. Fused aluminum oxide granules or crushed emery as the abrasive aggregate for a nonslip finish, with emery aggregate containing not less than 50 percent aluminum oxide and not less than 25 percent ferric oxide. Use material that is factory- graded, packaged, rustproof, nonglazing, and unaffected by freezing, moisture, and cleaning materials. D Dry-Shake Color Hardener Packaged dry combination of materials consisting of portland cement, graded quartz aggregate, coloring pigments, and plasticizing admixture. Use coloring pigments that are finely ground nonfading mineral oxides interground with cement. Color as selected by Architect from manufacturers' standards, unless indicated otherwise. E. Bonding Agent: Acrylic or styrene butadiene. F Epoxy Adhesive: ASTM C 881, two component material suitable for dry or damp surfaces. Provide material type, grade, and class to suit requirements. G. Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: H. Products: Subject to compliance with requirements, provide one of the following: 1 Dry -Shake Color Hardener a. Conshake 600 Colortone; Conspec Marketing Mfg. Co. b. Floorcron; Cormix Construction Chemicals. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS c. Quartz Tuff; Dayton- Superior d. Surfex; Euclid Chemical Co. e. Quartz Plate; L&M Construction Chemicals, Inc. f. Colorcron; Master Builders, Inc. g. Floor Quartz; Metalcrete Industries. h. Lithochrome Color Hardener L.M. Scofield Co. i. Harcol Redi -Mix; Sonneborn- Chemrex. j. Hard Top; Symons Corp. k. Colorundum; Tamms/A. C. Horn, Inc. 2. Bonding Agent: a. Acrylic Bondcrete; The Burke Co. b. Strongbond; Conspec Marketing and Mfg. Co. c. Day -Chem Ad Bond (J -40); Dayton Superior Corp. d. SBR Latex; Euclid Chemical Co. e. Daraweld C; W.R. Grace Co. f. Everbond; L&M Construction Chemicals, Inc. g. Acryl -Set; Master Builders Inc. h. Intralok; W.R. Meadows, Inc. i. Acrylpave; Metalcrete Industries. j. Sonocrete; Sonnebom-Chemrex. k. Stonlock LB2, Stonhard, Inc. 1. Strong Bond; Symons Corp. 3 Epoxy Adhesive: a. Burke Epoxy M.V The Burke Co. b. Spec -Bond 100• Conspec Marketing and Mfg. Co. c. Resi -Bond (J -58); Dayton Superior d. Euco Epoxy System #452 or #620• Euclid Chemical Co. e. Concresive Standard Liquid; Master Builders, Inc. f. Rezi -Weld 1000• W.R. Meadows, Inc. g. Metco Hi -Mod Epoxy Metalcrete Industries. h. Sikadur 32 Hi -Mod; Sika Corp. i. R-600 Series; Symons Corp. j. Epoxtite Binder 2390• Tamms/A C Horn, Inc. SECTION 02520 PAGE 7 PORTLAND CEMENT CONCRETE PAVING MAHLUM NORDFORS McKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02520 PAGE 8 PORTLAND CEMENT CONCRETE PAVING 2.7 CONCRETE MIX A. Prepare design mixes for each type and strength of normal- weight concrete by either laboratory trial batch or field experience methods as specified in ACI 301 For the trial batch method, use a qualified independent testing agency for preparing and reporting proposed mix designs. 1. Do not use the Owner's field quality- control testing agency as the independent testing agency 2. Limit use of fly ash to 25 percent of cement content by weight. B. Proportion mixes according to ACI 211 1 and ACI 301 to provide normal weight concrete with the following properties: 1 Compressive Strength (28 -Day) 3000 psi. 2. Maximum Water Cement Ratio at Point of Placement: 0.50 3 Slump Limit at Point of Placement: 3 inches. a. Slump limit for concrete containing high -range water reducing admixture (superplasticizer): Not more than 8 inches after adding admixture to site verified 2 to -3 -inch slump concrete. C. Add air- entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having an air content as follows with a tolerance of plus or minus 1 -1/2 percent: 1 Air Content: 5.5 percent for 1 -112 -inch maximum aggregate. 2. Air Content: 6 0 percent for 1 -inch maximum aggregate. 3 Air Content: 6 0 percent for 3/4 -inch maximum aggregate. 4 Air Content: 7 0 percent for 1/2 -inch maximum aggregate. 5 Air Content: 2.5 to 4.5 percent. D Fiber Reinforcement: Add to mix at rate of 1.5 lb per cu. yd. unless manufacturer recommends otherwise. E. Adjustment to Concrete Mixes: Mix design adjustments may be requested by Contractor when characteristics of materials, project conditions, weather, test results, or other circumstances warrant. 2.8 CONCRETE MIXING A. Ready -Mixed Concrete: Comply with requirements and with ASTM C 94 1 When air temperature is between 85 deg F (30 deg C) and 90 deg F (32 deg C), reduce mixing and delivery time from 1 -1/2 hours to 75 minutes; when air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes. PART 3- FXECUTION 3.1 SURFACE PREPARATION A. Proof -roll prepared subbase surface to check for unstable areas and verify need for additional compaction. Do not begin paving work until such conditions have been corrected and are ready to receive paving. B. Remove loose material from compacted subbase surface immediately before placing concrete. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.2 EDGE FORMS AND SCREED CONSTRUCTION 3.3 PLACING REINFORCEMENT 3.4 JOINTS SECTION 02520 PAGE 9 PORTLAND CEMENT CONCRETE PAVING A. Set, brace, and secure edge forms, bulkheads, and intermediate screed guides for paving to required lines, grades, and elevations. Install forms to allow continuous progress of work and so that forms can remain in place at least 24 hours after concrete placement. B. Check completed formwork and screeds for grade and alignment to following tolerances: 1 Top of Forms: Not more than 1/8 inch in 10 feet. 2. Vertical Face on Longitudinal Axis: Not more than 1/4 inch in 10 feet. C. Clean forms after each use and coat with form release agent as required to ensure separation from concrete without damage. A. General. Comply with Concrete Reinforcing Steel Institute's recommended practice for "Placing Reinforcing Bars" for placing and supporting reinforcement. B. Clean reinforcement of loose rust and mill scale, earth, ice, or other bond reducing materials. C Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement. Maintain minimum cover to reinforcement. D Install welded wire fabric in lengths as long as practicable. Lap adjoining pieces at least one full mesh and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction. Securely support and restrain fabric to prevent it from sinking to bottom or floating to top of slab during concrete pour E. Install fabricated bar mats in lengths as long as practicable. Handle units to keep them flat and free of distortions. Straighten bends, kinks, and other irregularities or replace units as required before placement. Set mats for a minimum 2 -inch overlap to adjacent mats. A. General. Construct contraction, construction, and isolation joints true to line with faces perpendicular to surface plane of concrete. Construct transverse joints at right angles to the centerline, unless indicated otherwise. 1 When joining existing paving, place transverse joints to align with previously placed joints, unless indicated otherwise. B. Contraction Joints: Provide weakened -plane contraction joints, sectioning concrete into areas as shown on Drawings. Construct contraction joints for a depth equal to at least 1/4 of the concrete thickness, as follows: 1 Tooled Joints: Form contraction joints in fresh concrete by grooving and finishing each edge of joint with a radiused jointer tool. 2. Sawed Joints: Form contraction joints with power saws equipped with shatterproof abrasive or diamond- rimmed blades. Cut 1/8- inch -wide joints into hardened concrete when cutting action will not tear, abrade, or otherwise damage surface and before development of random contraction cracks. 3 Inserts: Form contraction joints by inserting premolded plastic, hardboard, or fiberboard strips into fresh concrete until top surface of strip is flush with paving surface. Radius each joint edge with a jointer tool. Carefully remove strips or caps of two -piece assemblies after concrete has hardened. Clean groove of loose debris. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02520 PAGE 10 PORTLAND CEMENT CONCRETE PAVING C. Construction Joints: Set construction joints at side and end terminations of paving and at locations where paving operations are stopped for more than 1/2 hour, unless paving terminates at isolation joints. 1 Provide preformed galvanized steel or plastic keyway section forms or bulkhead forms with keys, unless indicated otherwise. Embed keys at least 1 -1/2 inches into concrete. 2. Continue reinforcement across construction joints unless indicated otherwise. Do not continue reinforcement through sides of strip paving unless indicated. 3 Provide tie bars at sides of paving strips where indicated. 4 Use bonding agent on existing concrete surfaces that will be joined with fresh concrete. D Isolation Joints: Form isolation joints of preformed joint filler strips abutting concrete curbs, catch basins, manholes, inlets, structures, walks, other fixed objects, and where indicated. 1 Locate expansion joints at intervals of 50 feet, unless indicated otherwise. 2. Extend joint fillers full width and depth of joint, not less than 1/2 inch or more than 1 inch below finished surface where joint sealant is indicated. Place top of joint filler flush with finished concrete surface when no joint sealant is required. 3 Furnish joint fillers in one -piece lengths for full width being placed wherever possible. Where more than one length is required, lace or clip joint filler sections together 4 Protect top edge of joint filler during concrete placement with a metal, plastic, or other temporary preformed cap. Remove protective cap after concrete has been placed on both sides of joint. E. Installation of joint fillers and sealants is specified in Division 7 Section "Paving Joint Sealants. F Install dowel bars and support assemblies at joints where indicated. Lubricate or asphalt -coat one half of dowel length to prevent concrete bonding to one side of joint. 3.5 CONCRETE PLACEMENT A. Inspection. Before placing concrete, inspect and complete formwork installation, reinforcing steel, and items to be embedded or cast in. Notify other trades to permit installation of their work. B Remove snow ice, or frost from subbase surface and reinforcing before placing concrete. Do not place concrete on surfaces that are frozen. C. Moisten subbase to provide a uniform dampened condition at the time concrete is placed. Do not place concrete around manholes or other structures until they are at the required finish elevation and alignment. D Comply with requirements and with ACI 304R for measuring, mixing, transporting, and placing concrete. E. Deposit and spread concrete in a continuous operation between transverse joints. Do not push or drag concrete into place or use vibrators to move concrete into place. 1 When concrete placing is interrupted for more than 1/2 hour, place a construction joint. F Use a bonding agent at locations where fresh concrete is placed against hardened or partially hardened concrete surfaces. 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02520 PAGE 11 PORTLAND CEMENT CONCRETE PAVING G. Consolidate concrete by mechanical vibrating equipment supplemented by hand- spading, rodding, or tamping. Use equipment and procedures to consolidate concrete complying with ACI 309R 1 Consolidate concrete along face of forms and adjacent to transverse joints with an internal vibrator Keep vibrator away from joint assemblies, reinforcement, or side t. forms. Use only square-faced shovels for hand spreading and consolidation. Consolidate with care to prevent dislocating reinforcing, dowels, and joint devices. H. Screed paved surfaces with a straightedge and strike off. Use bull floats or darbies to form a smooth surface plane before excess moisture or bleed water appears on the surface. Do not further disturb concrete surfaces prior to beginning finishing operations. Place concrete in two operations; strike off initial pour for entire width of placement and to the required depth below finish surface. Lay welded wire fabric or fabricated bar mats immediately in final position. Place top layer of concrete, strike off, and screed. 1 Remove and replace portions of bottom layer of concrete that have been placed more than 15 minutes without being covered by top layer or use bonding agent if acceptable to Architect. J Curbs and Gutters: When automatic machine placement is used for curb and gutter placement, submit revised mix design and laboratory test results that meet or exceed requirements. Produce curbs and gutters to required cross section, lines, grades, finish, and jointing as specified for formed concrete. If results are not acceptable, remove and replace with formed concrete. K. Slip -Form Pavers: When automatic machine placement is used for paving, submit revised mix design and laboratory test results that meet or exceed requirements. Produce paving to required thickness, lines, grades, finish, and jointing as required for formed paving. 1 Compact subbase and prepare subgrade of sufficient width to prevent displacement of paver machine during operations. L. When adjoining pavement lanes are placed in separate pours, do not operate equipment on concrete until pavement has attained 85 percent of its 28-day compressive strength. M. Cold- Weather Placement: Comply with provisions of ACI 306R and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures. 1 When air temperature has fallen to or is expected to fall below 40 deg F (4 deg C), uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 50 deg F (10 deg C) and not more than 80 deg F (27 deg C) at point of placement. 2. Do not use frozen materials or materials containing ice or snow 3 Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise accepted in mix designs. N Hot Weather Placement: Place concrete complying with ACI 305R and as specified when hot weather conditions exist. 1 Cool ingredients before mixing to maintain concrete temperature at time of placement to below 90 deg F (32 deg C). Mixing water may be chilled or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water Using liquid nitrogen to cool concrete is Contractor's option. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02520 PAGE 12 PORTLAND CEMENT CONCRETE PAVING 2. Cover reinforcing steel with water soaked burlap if it becomes too hot, so that steel temperature will not exceed the ambient air temperature immediately before embedding in concrete. 3 Fog spray forms, reinforcing steel, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas. 3.6 CONCRETE FINISHING A. Float Finish. Begin floating when bleed water sheen has disappeared and the concrete surface has stiffened sufficiently to permit operations. Float surface with power- driven floats, or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes within a tolerance of 1/4 inch in 10 feet as determined by a 10 -foot -long straightedge placed anywhere on the surface in any direction. Cut down high spots and fill low spots. Refloat surface immediately to a uniform granular texture. 1 Burlap Finish. Drag a seamless strip of damp burlap across concrete, perpendicular to line of traffic, to provide a uniform gritty texture finish. 2. Medium -to- Fine Textured Broom Finish. Draw a soft bristle broom across concrete surface perpendicular to line of traffic to provide a uniform fine line texture finish. 3 Medium -to- Coarse Textured Broom Finish. Provide a coarse finish by striating surface 1/16 inch to 1/8 inch deep with a stiff bristled broom, perpendicular to line of traffic. B Final Tooling: Tool edges of paving, gutters, curbs, and joints formed in fresh concrete with a jointing tool to the following radius. Repeat tooling of edges and joints after applying surface finishes. Eliminate tool marks on concrete surfaces. 1 Radius: 1/4 inch. 2. Radius: 3/8 inch. 3.7 SPECIAL FINISHES A. Nonslip Aggregate Finish. Apply nonslip aggregate finish to paving surfaces indicated. 1 After completing float finish, uniformly spread 25 lb of dampened nonslip aggregate per 100 sq. ft. of surface. Tamp aggregate flush with surface using a steel trowel, but do not force below surface. 2. After curing, lightly work surface with a steel wire brush or an abrasive stone, and water to expose nonslip aggregate. B Dry-Shake Color Hardener Finish. Apply a dry-shake color hardener finish to indicated paving surfaces as follows: 1 Uniformly apply dry-shake materials at a rate of 100 lb per 100 sq. ft. unless a greater amount is recommended by material manufacturer 2. Immediately following the first floating operation, uniformly distribute approximately 2/3 of the dry-shake material over the concrete surface with a mechanical spreader and embed by power floating. Follow the floating operation with a second shake application, uniformly distributing the remainder of the dry-shake material to ensure uniform color and embed by power floating. 3 After final floating, apply a light hand -trowel finish followed by a broom finish to concrete. Cure concrete with a curing compound recommended by the dry-shake material manufacturer Apply the curing compound immediately after final finishing. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.8 CONCRETE PROTECTION AND CURING SECTION 02520 PAGE 13 PORTLAND CEMENT CONCRETE PAVING A. General. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with the recommendations of ACI 306R for cold weather protection and ACI 305R for hot weather protection during curing. B. Evaporation Control. In hot, dry and windy weather, protect concrete from rapid moisture loss before and during finishing operations with an evaporation control material. Apply according to manufacturer's instructions after screeding and bull floating, but before floating. C. Begin curing after finishing concrete but not before free water has disappeared from concrete surface. D Curing Methods: Cure concrete by moisture curing, moisture- retaining -cover curing, curing compound, or a combination of these as follows: 1 Moisture Curing: Keep surfaces continuously moist for not less than 7 days with the following materials: a. Water b Continuous water -fog spray c. Absorptive cover water saturated, and kept continuously wet. Cover concrete surfaces and edges with a 12 -inch lap over adjacent absorptive covers. 2. Moisture Retaining -Cover Curing: Cover concrete surfaces with moisture retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Immediately repair any holes or tears during curing period using cover material and waterproof tape. 3 Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's directions. Recoat areas subjected to heavy rainfall within 3 hours after initial application. Maintain continuity of coating and repair damage during curing period. E. Boiled Linseed Oil Treatment: Apply boiled linseed oil mixture no sooner than 28 days after placement to clean dry concrete surfaces free of oil, dirt, or other foreign material. Apply in 2 sprayed applications at rate of 40 sq. yd. per gallon for the first application and 60 sq. yd. per gallon for the second application. Allow complete drying between applications. 3.9 TRAFFIC PAINT A. Traffic Paint: Apply traffic paint for striping and other markings with mechanical equipment to produce uniform straight edges. Apply at manufacturer's recommended rates to provide a 15 -mil minimum wet film thickness. 3.10 FIELD QUALITY CONTROL TESTING A. The Owner will employ a qualified testing and inspection agency to sample materials, perform tests, and submit test reports during concrete placement. Sampling and testing for quality control may include the following: 1 Sampling Fresh Concrete: ASTM C 172, except modified for slump to comply with ASTM C 94 a. Slump: ASTM C 143 one test at point of placement for each compressive- strength test but no less than one test for each day's pour of each type of concrete. Additional tests will be required when concrete consistency changes. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.11 REPAIRS AND PROTECTION SECTION 02520 PAGE 14 PORTLAND CEMENT CONCRETE PAVING b. Air Content: ASTM C 231, pressure method; one test for each compressive strength test but no less than one test for each day's pour of each type of air entrained concrete. c. Concrete Temperature: ASTM C 1064 one test hourly when air temperature is 40 deg F (4 deg C) and below and when 80 deg F (27 deg C) and above, and one test for each set of compressive strength specimens. d. Compression Test Specimens: ASTM C 31 one set of four standard cylinders for each compressive strength test, unless directed otherwise. Mold and store cylinders for laboratory-cured test specimens except when field -cured test specimens are required. e. Compressive- Strength Tests: ASTM C 39• one set for each day's pour of each concrete class exceeding 5 cu. yd. but less than 25 cu. yd. plus one set for each additional 50 cu. yd. Test one specimen at 7 days, test two specimens at 28 days, and retain one specimen in reserve for later testing if required. 2. When frequency of testing will provide fewer than five strength tests for a given class of concrete, conduct testing from at least five randomly selected batches or from each batch if fewer than five are used. 3 When total quantity of a given class of concrete is less than 50 cu. yd. Architect may waive strength testing if adequate evidence of satisfactory strength is provided. 4 When strength of field -cured cylinders is less than 85 percent of companion laboratory- cured cylinders, evaluate current operations and provide corrective procedures for protecting and curing the in -place concrete. 5 Strength level of concrete will be considered satisfactory if averages of sets of three consecutive strength test results equal or exceed specified compressive strength and no individual strength test result falls below specified compressive strength by more than 500 psi. C Test results will be reported in writing to Architect, concrete manufacturer, and Contractor within 24 hours of testing. Reports of compressive strength tests shall contain the Project identification name and number date of concrete placement, name of concrete testing agency concrete type and class, location of concrete batch in paving, design compressive strength at 28 days, concrete mix proportions and materials, compressive breaking strength, and type of break for both 7-day and 28-day tests. D Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted but shall not be used as the sole basis for acceptance or rejection. E. Additional Tests: The testing agency will make additional tests of the concrete when test results indicate slump, air entrainment, concrete strengths, or other requirements have not been met, as directed by Architect. Testing agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 42, or by other methods as directed. A. Remove and replace concrete paving that is broken, damaged, or defective, or does not meet the requirements of this Section. B Drill test cores where directed by Architect when necessary to determine magnitude of cracks or defective areas. Fill drilled core holes in satisfactory pavement areas with portland cement concrete bonded to paving with epoxy adhesive. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Protect concrete from damage. Exclude traffic from paving for at least 14 days after placement. When construction traffic is permitted, maintain paving as clean as possible by removing surface stains and spillage of materials as they occur D Maintain concrete paving free of stains, discoloration, dirt, and other foreign material. Sweep concrete paving not more than 2 days prior to date scheduled for Substantial Completion inspections. 0 1997 Mahhun Nordfors McKinley Gordon SECTION 02520 PAGE 15 PORTLAND CEMENT CONCRETE PAVING END OF SECTION 02520 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 02665 PAGE 1 WATER SYSTEMS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes water systems piping for potable water service and fire protection service outside the building. B This Section does not include tapping of utility company water main by utility company and charged directly to Owner C. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 15 Sections for fire protection systems inside building. 2. Division 15 Sections for water distribution systems inside building. D Utility- furnished products include water meters that will be furnished to the site and ready for installation. 1.3 SYSTEM PERFORMANCE REQUIREMENTS A. Minimum Working Pressure Ratings: Except where otherwise indicated, the following are minimum pressure requirements for water system piping. 1 Underground Piping: 150 psig (1035 kPa). 2. Underground Piping, Downstream of Fire Department Connections: 200 psig (1380 kPa). 1.4 SUBMITTALS A. General. Submit the following according to Conditions of the Contract and Division 1 Specification Sections. B. Product data, including pressure rating, rated capacity and settings of selected models for the following: 1 Water meters. 2. Backflow preventers. 3 Valves. 4 Fire hydrants. 5 Fire department connections. 6 Yard hydrants. 7 Identification materials and devices. C Shop drawings for precast concrete pits. Include frames and covers. Include drains when indicated. D Shop drawings for cast -in -place concrete valve and meter pits. Include frames and covers. Include drains when indicated. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.5 QUALITY ASSURANCE SECTION 02665 PAGE 2 WATER SYSTEMS E. Wiring diagrams for alarm devices. F Coordination drawings showing pipe sizes and valves, meter and specialty locations and elevations. Include details �f underground structures, connections, anchors, and reaction backing. Show other piping in same trench and clearances from water system piping. Indicate interface and spatial relationship between piping and proximate structures. G. Record drawings at Project closeout of installed water system piping and products according to Division 1 Section "Project Closeout." H. Test reports specified in "Field Quality Control" Article in Part 3 Maintenance data for inclusion in "Operating and Maintenance Manual" specified in Division 1 Section "Project Closeout." Include data for the following: 1 Water meters. 2. Backflow preventers. 3 Valves. 4 Fire hydrants. 5 Yard hydrants. A. Comply with requirements of utility supplying water Include tapping of water mains and backflow prevention. B Comply with standards of authorities having jurisdiction for fire protection systems. Include materials, hose threads, installation, and testing. C. Comply with standards of authorities having jurisdiction for potable water piping and plumbing systems. Include materials, installation, testing, and disinfection. D Comply with NFPA 24 "Standard for the Installation of Private Fire Service Mains and Their Appurtenances" for materials, installations, tests, and flushing. E. Comply with NFPA 70 "National Electrical Code" for electrical connections between wiring and electrically operated devices. F Provide listing/approval stamp, label, or other marking on equipment made to specified standards. G. Listing and Labeling: Provide equipment and accessories that are listed and labeled. 1 The Terms 'Listed" and "Labeled" As defined in "National Electrical Code," Article 100 2. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" (NRTL) as defined in OSHA Regulation 1910 7 H. Product Options: Water systems specialties and accessories are based on specific types, manufacturers, and models indicated. Components by other manufacturers but having equal performance characteristics may be considered, provided deviations in dimensions, operation, and other characteristics do not change design concept or intended performance as judged by Architect. The burden of proof of equality of products is on Contractor Refer to Division 1 Section "Product Substitutions." 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 DELIVERY STORAGE, AND HANDLING SECTION 02665 PAGE 3 WATER SYSTEMS A. Preparation for Transport: Prepare valves, including fire hydrants, for shipping as follows: 1 Ensure that valves are dry and internally protected against rust and corrosion. 2. Protect valves against damage to threaded ends, flange faces, and weld ends. 3 Set valves in best position for handling. Set valves closed to prevent rattling. B Storage: Use the following precautions for valves, including fire hydrants, during storage: 1 Do not remove end protectors unless necessary for inspection; then reinstall for storage. 2. Protect valves from weather. Store valves indoors and maintain temperature higher than ambient dew point temperature. Support valves off ground or pavement in watertight enclosures when outdoor storage is necessary C Handling: Use sling to handle valves and fire hydrants whose size requires handling by crane or lift. Rig valves to avoid damage to exposed valve parts. Do not use handwheels or stems as lifting or rigging points. D Deliver pipes and tubes with factory- applied end -caps. Maintain end -caps through shipping, storage, and handling to prevent pipe -end damage and to prevent entrance of dirt, debris, and moisture. E. Protect stored pipes and tubes from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside. F Protect flanges, fittings, and piping specialties from moisture and dirt. G. Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending. 1.7 PROJECT CONDITIONS A. Perform site survey research public utility records, and verify existing utility locations. Contact utility- locating service for area where Project is located. B Verify that water system piping may be installed in compliance with original design and referenced standards. C Site Information. Reports on subsurface condition investigations made during the design of the Project are available for informational purposes only data in reports are not intended as representations or warranties of accuracy or continuity of conditions (between soil borings). Owner assumes no responsibility for interpretations or conclusions drawn from this information. 1.8 SEQUENCING AND SCHEDULING A. Coordinate connection to water main with utility company B Coordinate with pipe materials, sizes, entry locations, and pressure requirements of building fire protection systems piping. C Coordinate with pipe materials, sizes, entry locations, and pressure requirements of building water distribution systems piping. D Coordinate with other utility work. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.2 PIPES AND TUBES SECTION 02665 PAGE 4 WATER SYSTEMS E. Coordinate electrical requirements of actual equipment furnished with requirements specified in Division 16 PART 2 PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1 Bronze Corporation Stops and Valves: a. Ford Meter Box Co. Inc. b. Hays Div Romac Industries. c. A.Y McDonald Mfg. Co. d. Mueller Co. Grinnell Corp. 2. Gate Valves: a. American Darling Valve Div American Cast Iron Pipe Co. b. Clow Valve Co. Div McWane, Inc. c. East Jordan Iron Works, Inc. d. Gem Sprinkler Co. Div Grinnell Corp. e. Hammond Valve Corp. f. Kennedy Valve Div McWane, Inc. g. Milwaukee Valve Co. Inc. h. Mueller Co. Grinnell Corp. i. Nibco, Inc. j. Stockham Valves Fittings, Inc. k. U S. Pipe Foundry Co. 1. Waterous Co. A. Refer to Part 3 Article "Piping Applications" for identification of systems where pipe and tube materials specified below are used. B Ductile -Iron Pipe: AWWA C151, Classes 150 200 and 250 1 Lining: AWWA C104 cement mortar seal coated. 2. Gaskets, Glands, and Bolts and Nuts: AWWA C111 3 Push -On -Joint Type Pipe: AWWA C111, rubber gaskets. 4 Mechanical- Joint -Type Pipe: AWWA C111, rubber gaskets, ductile- or cast -iron glands, and steel bolts and nuts. 5 Encasement: AWWA C105 polyethylene film tube. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.3 PIPE AND TUBE FITTINGS SECTION 02665 PAGE 5 WATER SYSTEMS C. Copper Tube: ASTM B 88, Types K and L (ASTM B 88M, Types A and B), seamless water tube, annealed temper D Polyvinyl Chloride (PVC) Pipe: AWWA C900• Classes 150 and 200• with bell end and elastomeric gasket, with plain end for cast -iron or ductile -iron fittings, or with plain end for PVC elastomeric gasket fittings. 1. Pipe Marking: NSF 14 "NSF -pvc cto only 2. Gaskets: ASTM F 477 elastomeric seal. A. Refer to Part 3 Article "Piping Applications" for identification of systems where pipe and tube fitting materials specified below are used. B. Ductile -Iron and Cast =Iron Pipe Fittings: AWWA C110, ductile -iron or cast -iron, 250 -psig (1725 kPa) minimum pressure rating; or AWWA C153 ductile -iron compact fittings, 350 -psig (2400 kPa) pressure rating. 1 Lining: AWWA C104 cement mortar 2. Gaskets: AWWA C111, rubber 2.4 JOINING MATERIALS A. Refer to Part 3 Article "Piping Applications" for identification of systems where joining materials specified below are used. B Ductile -Iron Pipe and Ductile -Iron or Cast -Iron Fittings: The following materials apply 1 Push -On Joints: AWWA C111 rubber gaskets and lubricant. 2. Mechanical Joints: AWWA C111 ductile -iron or gray -iron glands, high- strength steel bolts and nuts, and rubber gaskets. 3 Flanged Joints: AWWA C115 ductile -iron or gray -iron pipe flanges, rubber gaskets, and high strength steel bolts and nuts. a. Gaskets: Rubber flat face, 1/8 inch (3 mm) thick except where other thickness is indicated; and full -face or ring type except where other type is indicated. b. Flange Bolts and Nuts: ASME B18.2.1 carbon steel, except where other material is indicated. C. Pipe Couplings: Iron -body sleeve assembly fabricated to match outside diameters of pipes to be joined. 1 Sleeve: ASTM A 126, Class B, gray iron. 2. Followers: ASTM A 47 Grade 32510 or ASTM A 536 ductile iron. 3 Gaskets: Rubber 4 Bolts and Nuts: AWWA C111 5 Finish. Enamel paint. 6 Encasement: AWWA C105 polyethylene film tube or sheet. 2.5 PIPING SPECIALTIES A. Dielectric Fittings: Assembly or fitting having insulating material isolating joined dissimilar metals to prevent galvanic action and corrosion. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.6 VALVES SECTION 02665 PAGE 6 WATER SYSTEMS 1 Description. Combination of copper alloy and ferrous; threaded, solder, plain, and weld neck.end types and matching piping system materials. 2. Dielectric Unions: Factory- fabricated union assembly designed for 250 -psig (1725 kPa) minimum working pressure at 180 deg F (82 deg C). Include insulating material isolating dissimilar metals and ends with inside threads according to ASME B1.20 1. 3 Dielectric Flanges: Factory- fabricated companion -flange assembly for 150 -psig (1035 kPa) or 300 -psig (2070 kPa) minimum pressure to suit system pressures. 4 Dielectric -Flange Insulation Kits: Field assembled companion -flange assembly full -face or ring type. Components include neoprene or phenolic gasket, phenolic or polyethylene bolt sleeves, phenolic washers, and steel backing washers. a. Provide separate companion flanges and steel bolts and nuts for 150 -psig (1035 kPa) or 300 -psig (2070 kPa) minimum working pressure to suit system pressures. 5 Dielectric Couplings: Galvanized -steel couplings having inert and noncorrosive thermoplastic lining, with threaded ends and 300 -psig (2070 kPa) minimum working pressure at 225 deg F (107 deg C): 6 Dielectric Nipples: Electroplated steel nipples having inert and noncorrosive thermoplastic lining, with combination of plain, threaded, or grooved end types and 300 -psig (2070 kPa) working pressure at 225 deg F (107 deg C). A. Nonrising Stem Gate Valves 3 Inches (80 nun) and Larger AWWA C509 resilient seated; bronze stem, cast -iron or ductile -iron body and bonnet, stem nut, 200 -psig (1380 kPa) working pressure, mechanical joint ends. B Valve Boxes: Cast -iron box having top section and cover with lettering "WATER, bottom section with base of size to fit over valve and barrel approximately 5 inches (124 mm) in diameter and adjustable cast -iron extension of length required for depth of bury of valve. 1 Provide a steel tee -handle operating wrench with each valve box. Wrench shall have tee handle with one pointed end, stem of length to operate valve, and socket -fitting valve operating nut. C Curb Stops: Bronze body ground key plug or ball, and wide tee head, with inlet and outlet to match service piping material. D Service Boxes for Curb Stops: Cast -iron box with telescoping top section of length required for depth of bury of valve. Include cover having lettering "WATER," and bottom section with base of size to fit over curb stop and barrel approximately 3 inches (75 nun) in diameter 1 Provide steel tee -handle shutoff rod with each service box. Shutoff rod shall have tee handle with 1 pointed end, stem of length to operate curb stop, and slotted end fitting curb stop head. E. Service Clamps and Corporation Stops: Complete assembly including service clamp, corporation stop, and bolts and nuts. Use service clamp and stop compatible with drilling machine. 1 Service Clamp. Cast iron or ductile iron with gasket and AWWA C800 threaded outlet for corporation stop, and threaded end straps. 2. Corporation Stops: Bronze body and ground key plug, with AWWA C800 threaded inlet and outlet matching service piping material. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02665 PAGE 7 WATER SYSTEMS 3 Manifold. Copper with 2 to 4 inlets as required, with ends matching corporation stops and outlet matching service piping. 2.7 ANCHORAGES A. Clamps, Straps, and Washers: ASTM A 506, steel. B. Rods: ASTM A 575 steel. C. Rod Couplings: ASTM A 197 malleable iron. D Bolts: ASTM A 307 steel. E. Cast -Iron Washers: ASTM A 126, gray iron. F Concrete Reaction Backing: Portland cement concrete mix, 3000 psi (20 7 MPa). 1 Cement: ASTM C 150 Type I. 2. Fine Aggregate: ASTM C 33 sand. 3 Coarse Aggregate: ASTM C 33 crushed gravel. 4 Water Potable. 2.8 IDENTIFICATION A. Metallic -Lined Plastic Underground Warning Tapes: Polyethylene plastic tape with metallic core, 6 inches (150 mm) wide by 4 mils (1 mm) thick, solid blue in color with continuously printed caption in black letters "CAUTION WATER LINE BURIED BELOW B Nonmetallic Piping Label. Engraved plastic laminate label, for installation on main electrical meter panel; not less than 1 inch (25 mm) by 3 inches (75 mm), with caption "CAUTION THIS STRUCTURE HAS A NONMETALLIC WATER SERVICE. PART 3 EXECUTION 3.1 EARTHWORK A. Excavation, trenching, and backfilling are specified in Division 2 Section "Earthwork. 3.2 SERVICE ENTRANCE PIPING A. Extend water system piping and connect to water supply source and building water distribution and fire protection systems at outside face of the building wall in locations and pipe sizes indicated. 1 Terminate water system piping at building wall until building water systems are installed. Terminate piping with caps, plugs, or flanges as required for piping material. Make connections to building water systems when those systems are installed. B. Water distribution systems and fire protection systems are specified in Division 15 Sections. Sleeves and mechanical sleeve seals are specified in Division 15 Section "Basic Mechanical Materials and Methods. C. Install restrained joints for buried piping within 5 feet (1.5 m) of building. Use restrained joint pipe and fittings, thrust blocks, anchors, tie -rods and clamps, and other supports at vertical and horizontal offsets. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.3 PIPING APPLICATIONS 3.4 VALVE APPLICATIONS 3.5 JOINT CONSTRUCTION SECTION 02665 PAGE 8 WATER SYSTEMS A. Refer to Part 2 of this Section for detailed specifications for pipe and fittings products listed below Use pipe, tube, fittings, and joining methods according to the following applications. Piping in pits and inside building may be joined with flanges or couplings, instead of joints indicated, for grooved -end AWWA -size piping. B Use pipe, tube, fittings, and joining methods according to following applications. 1 4 Inches (100 mm) to 8 Inches (200 mm) AWWA C900 Class 150 polyvinyl chloride (PVC) plastic pipe,---AWWA C110 or AWWA C153 Class 150 minimum, ductile -iron or gray -iron fittings, and mechanical or push -on joints. A. Drawings indicate valve types to be used. Where specific valve types are not indicated, the following requirements apply 1 Buried Valves 3 Inches (80 mm) and Larger AWWA, gate valves, nonrising stem, with valve box. A. AWWA Polyvinyl Chloride (PVC) Piping Gasketed Joints: Use AWWA C900 joining materials. Construct joints with elastomeric seals and lubricant according to ASTM D 2774 or ASTM D 3139 and pipe manufacturer's written instructions. B. Dissimilar Materials Piping Joints: Construct joints using adapters that are compatible with both piping materials, outside diameters, and system working pressure. Refer to 'Piping Systems Common Requirements" Article for joining piping of dissimilar metals. 3.6 PIPING SYSTEMS COMMON REQUIREMENTS A. General Locations and Arrangements: Drawings indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated except where deviations to layout are approved on coordination drawings. B. Install piping at indicated slope. C Install components having pressure rating equal to or greater than system operating pressure. D Install piping free of sags and bends. E. Locate groups of pipes parallel to each other spaced to permit valve servicing. F Install fittings for changes in direction and branch connections. G. Piping Connections: Except as otherwise indicated, make piping connections as specified below 1 Install unions, in piping 2 inches (50 min) and smaller adjacent to each valve and at final connection to each piece of equipment having 2 -inch (50 mm) or smaller threaded pipe connection. 2. Install flanges, in piping 2 1/2 inches (65 mm) and larger adjacent to flanged valves and at final connection to each piece of equipment having flanged pipe connection. 3 Install dielectric fittings to connect piping of dissimilar metals. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.7 PIPING INSTALLATION A. Water Main Connection. Arrange for tap in water main, of size and in location indicated, from water utility B. Water Main Connection. Tap water main with size and in location as indicated according to 'requirements of water utility 1 Install tapping sleeve and tapping valve according to manufacturer's installation instructions. 2. Install tapping sleeve on pipe to be tapped. Position flanged outlet for gate valve. 3 Install gate valve onto tapping sleeve. Comply with AWWA C600 Install valve with stem pointing up and with cast -iron valve box. 4 Use tapping machine compatible with valve and tapping sleeve; cut hole in main. Remove tapping machine and connect water service piping. 5 Install service clamps and corporation stops in size, quantity and arrangement required by utility company standards and according to manufacturer's installation instructions. 6 Install service clamps on pipe to be tapped. Position outlet for corporation stop. 7 Install corporation stops into service clamps. Install valve with stem pointing up and with cast -iron valve box. 8. Install curb stop in service piping with head pointing up and with cast -iron service box. 9 Install manifold for multiple taps in water main. 10 Use drilling machine compatible with service clamp and corporate stop. Drill hole in main. Remove drilling machine and connect water service piping. C Install AWWA polyvinyl chloride (PVC) plastic pipe according to AWWA M23 3.8 ANCHORAGE INSTALLATION SECTION 02665 PAGE 9 WATER SYSTEMS D Bury piping at minimum depth of 36 inches (1 m) below finished grade and not less than 18 inches (0.5 m) below average local frost depth. A. Anchorages: Install anchorages for tees, plugs and caps, bends, crosses, valves, and hydrant branches. Include anchorages for the following piping systems: 1 Gasketed Joint, Ductile -Iron Piping: According to AWWA C600 2. Gasketed Joint, Polyvinyl Chloride (PVC) Piping: According to AWWA M23 3 Fire Service Piping: According to NFPA 24 B Apply full coat of asphalt or other acceptable corrosion retarding material to surfaces of installed ferrous anchorage devices. 3.9 VALVE INSTALLATION A. General Application. Use mechanical-joint-end valves for 3 -inch (80 mm) and larger buried installation. Use threaded- and flanged -end valves for installation in pits and inside building. Use nonrising stem UL/FM gate valves for installation with indicator posts. Use bronze corporation stops and valves, with ends compatible with piping, for 2 -inch (50 mm) and smaller installation. B. AWWA -Type Gate Valves: Comply with AWWA C600 Install buried valves with stem pointing up and with cast -iron valve box. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02665 PAGE 10 WATER SYSTEMS C. UL/FM -Type Gate Valves: Comply with NFPA 24 1 Install buried valves and valves in pits with stem pointing up and with vertical cast -iron indicator post. D Bronze Corporation Stops and Curb Stops: Comply with manufacturer's installation instructions. Install buried curb stops with head pointed up and with cast -iron curb box. 3.10 IDENTIFICATION INSTALLATION A. Install continuous plastic underground warning tape during back filling of trench for underground water service piping. Locate 6 inches (150 mm) to 8 inches (200 mm) below finished grade, directly over piping. B Attach nonmetallic piping label permanently to main electrical meter panel. 3.11 FIELD QUALITY CONTROL A. Piping Tests: Conduct piping tests before joints are covered and after thrust blocks have hardened sufficiently Fill pipeline 24 hours prior to testing and apply test pressure to stabilize system. Use only potable water B. Hydrostatic Tests: Test at not less than 1 -1/2 times working pressure for 2 hours. 1 Increase pressure in 50 -psig (350 kPa) increments and inspect each joint between increments. Hold at test pressure for 1 hour decrease to 0 psig (0 kPa). Slowly increase again to test pressure and hold for 1 more hour Maximum allowable leakage is 2 quarts (1 89 L) per hour per 100 joints. Remake leaking joints with new materials and repeat test until leakage is within above limits. 3.12 CLEANING A. Clean and disinfect water distribution piping as follows: 1 Purge new water distribution piping systems and parts of existing systems that have been altered, extended, or repaired prior to use. 2. Use purging and disinfecting procedure prescribed by authority having jurisdiction or, if method is not prescribed by that authority use procedure described in AWWA C651 or as described below a. Comply with NFPA 24 for flushing of piping. Flush piping system with clean, potable water until dirty water does not appear at points of outlet. b. Fill system or part of system with water /chlorine solution containing at least 50 parts per million of chlorine. Isolate (valve off) system or part thereof and allow to stand for 24 hours. c. Drain system or part of system of previous solution and refill with water /chlorine solution containing at least 200 parts per million of chlorine; isolate and allow to stand for 3 hours. MAHLUM NORDFORS McK!NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 0 1997 Mahlum Nordfors McKinley Gordon d. Following allowed standing time, flush system with clean, chlorine does not remain in water coming from system. e. Submit water samples in sterile bottles to authority having procedure if biological examination made by authority contamination. B. Prepare reports for purging and disinfecting activities. SECTION 02665 PAGE 11 WATER SYSTEMS potable water until jurisdiction. Repeat shows evidence of END OF SECTION 02665 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 02700 PAGE 1 SEWERAGE AND DRAINAGE A. Drawings and general provisions of the Contract, including the General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes sewerage and drainage systems outside the building. Systems include the following: 1 Sanitary sewerage. 2. Storm drainage. 3 Combined sanitary sewerage and storm drainage. 4 Force main. B Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 2 Section "Foundation Drainage Systems' for foundation drain connecting to storm drainage system. 2. Division 3 Section "Cast -in -Place Concrete" for cast -in -place concrete structures. 3 Division 15 Section "Plumbing Piping" for building drains. 4 Division 15 Section 'Drainage and Vent Systems" for building drains. 1.3 DEFINITIONS A. Combined Sewerage and Drainage Piping: System of sewer pipes, fittings, and appurtenances for gravity flow of sanitary sewage and storm drainage. B Drainage Piping: System of sewer pipe, fittings, and appurtenances for gravity flow of storm drainage. C. Force -Main Piping: System of pipe, fittings, and appurtenances for pumped flow of sanitary sewage or storm drainage. B Sewerage Piping: System of sewer pipe, fittings, and appurtenances for gravity flow of sanitary sewage. 1.4 PERFORMANCE REQUIREMENTS A. Gravity-Flow Nonpressure- Piping Pressure Ratings: At least equal to system test pressure. B Force -Main Pressure Ratings: At least equal to system operating pressure, but not less than 150 psig (1035 kPa). 1.5 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B Product data for the following: 1 Polymer- concrete, channel drainage systems. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS H. Inspection and test reports specified in the "Field Quality Control Article. 1.6 QUALITY ASSURANCE SECTION 02700 PAGE 2 SEWERAGE AND DRAINAGE 2. Plastic, channel drainage systems. 3 Stainless- steel, trench drainage systems. 4 Backwater valves, cleanouts, and drains. 5 Plastic drywells. 6 Storm -water disposal systems. C. Shop drawings for precast concrete manholes and other structures. Include frames, covers, and grates. D Shop drawings for cast -in -place concrete or field erected masonry manholes and other structures. Include frames, covers, and grates. E. Reports and calculations for design mixes for each class of cast -in -place concrete. F Coordination drawings showing manholes and other structures, pipe sizes, locations, and elevations. Include details of underground structures and connections. Show other piping in same trench and clearances from sewerage system piping. Indicate interface and spatial relationship between piping and proximate structures. G. Coordination profile drawings showing systems piping in elevation. Draw profiles at horizontal scale of not less than 1 inch equals 50 feet (1.500 metric ratio) and vertical scale of not less than 1 inch equals 5 feet (1.50 metric ratio). Indicate underground structures and pipe. Show types, sizes, materials, and elevations of other utility crossing system piping. Include drawings for the following piping systems: 1 Sanitary sewerage. 2. Storm drainage. 3 Combined sanitary sewerage and storm drainage. 4 Force main. A. Environmental Agency Compliance: Comply with regulations pertaining to sanitary sewerage and storm drainage systems. B Utility Compliance: Comply with regulations pertaining to sanitary sewerage and storm drainage systems. Include standards of water and other utilities where appropriate. C. Product Options: Drawings indicate sizes, profiles, connections, and dimensional requirements of system components and are based on specific manufacturer types indicated. Other manufacturers' products with equal performance characteristics may be considered. Refer to Division 1 Section "Product Substitutions." 1.7 DELIVERY STORAGE, AND HANDLING A. Do not store plastic structures in direct sunlight. B Do not store plastic pipe or fittings in direct sunlight. C. Protect pipe, pipe fittings, and seals from dirt and damage. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Handle precast concrete manholes and other structures according to manufacturer's rigging instructions. 1.8 PROJECT CONDITIONS A. Site Information. Perform site survey research public utility records, and verify existing utility Ibcations. B. Locate existing structures and piping to be closed and abandoned. C. Existing Utilities: Do not interrupt existing utilities serving facilities occupied by the Owner or others except when permitted under the following conditions and then only after arranging to provide acceptable temporary utility services. 1 Notify Architect not less than 48 hours in advance of proposed utility interruptions. 2. Do not proceed with utility interruptions without receiving Architect's written permission. 1.9 SEQUENCING AND SCHEDULING A. Coordinate sanitary sewerage system connections to utility company's sanitary sewer B Coordinate storm drainage system connections to utility company's storm sewer C. Coordinate combined sanitary sewerage and storm drainage system connections to utility company's combined sewer D Coordinate sanitary sewerage system connections to existing on -site sanitary sewer E. Coordinate sanitary sewerage system connections to septic system. F Coordinate storm drainage system connections to existing on -site storm sewer G. Coordinate combined sanitary sewerage and storm drainage system connections to Owner's existing on -site combined sewer H. Coordinate with interior building drainage systems. I. Coordinate with other utility work. PART 2 PRODUCTS 2.1 MANUFACTURERS SECTION 02700 PAGE 3 SEWERAGE AND DRAINAGE A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: B Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1 Polymer- Concrete, Channel Drainage Systems: a. ABT Inc. b. ACO Polymer Products, Inc. c. Innovative Plastic Products, Inc. d. Quazite Div Morrison Molded Fiber Glass Co MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Plastic Channel Drainage Systems: a. ACO Polymer Products, Inc. b. National Diversified Sales, Inc. c. Zurn Industries, Inc. Hydromechanics Div 3 Stainless Steel, Trench Drainage Systems: a. Blucher Josam Div Josam Co. 4 Backwater Valves, Cleanouts, and Drains: a. Ancon, Inc. b Jones Manufacturing Co. Inc. c. Josam Co. d. Rockford Sanitary Systems, Inc. e. Jay R Smith Mfg. Co. Div Smith Industries, Inc. f. Wade Div Tyler Corp. g. Zurn Industries, Inc. Hydromechanics Div 5 Plastic Drywells: a. 0-Well Products, Ltd. 6 Storm -Water Disposal Systems: a. Cultec, Inc. b. Infiltrator Systems, Inc. 2.2 PIPES AND FITTINGS 2.3 SPECIAL PIPE COUPLINGS AND FITTINGS SECTION 02700 PAGE 4 SEWERAGE AM) DRAINAGE A. Polyvinyl Chloride (PVC) Sewer Pipe and Fittings: ASTM D 3034 SDR 35 for gasketed joints. 1 Gaskets: ASTM F 477 elastomeric seal. A. Sleeve -Type Pipe Couplings: Rubber or elastomeric sleeve and band assembly fabricated to match outside diameters of pipes to be joined, for nonpressure joints. 1 Sleeves for Concrete Pipe: ASTM C 443 (ASTM C 443M), rubber 2. Sleeves for Cast -Iron Soil Pipe: ASTM C 564 rubber 3 Sleeves for Plastic Pipe: ASTM F 477 elastomeric seal. 4 Sleeves for Dissimilar Pipes: Compatible with pipe materials being joined. 5 Bands: Stainless steel, at least one at each pipe insert. B. Gasket -Type Pipe Couplings: Rubber or elastomeric compression gasket, made to match outside diameter of smaller pipe and inside diameter or hub of adjoining larger pipe, for nonpressure joints. 1 Gaskets for Concrete Pipe: ASTM C 443 (ASTM C 443M), rubber 2. Gaskets for Cast -Iron Soil Pipe: ASTM C 564 rubber 3 Gaskets for Plastic Pipe: ASTM F 477 elastomeric seal. 4 Gaskets for Dissimilar Pipes: Compatible with pipe materials being joined. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Internal, Expansion -Type Pipe Couplings: Stainless -steel expansion band with ethylene propylene- diene monomer (EPDM), rubber- compound sealing sleeve, made to match inside diameter of pipes for nonpressure joints. Use nitrile rubber compound sealing sleeve for fluids containing oil or gasoline. D Pressure -Type Pipe Couplings: Iron -body sleeve assembly matching outside diameters of pipes to be joined, for pressure joints. Include polyethylene (PE) film encasement. 1 Sleeve: ASTM A 126, Class B, gray iron with enamel paint finish. 2. Followers: ASTM A 47 Grade 32510 (ASTM A 47M, Grade 22010), or ASTM A 536 ductile iron. 3 Gaskets, Bolts, and Nuts: AWWA C111 2.5 MANHOLES SECTION 02700 PAGE 5 SEWERAGE AND DRAINAGE A. Precast Concrete Manholes: ASTM C 478 (ASTM C 478M), precast, reinforced concrete, of depth indicated, with provision for rubber gasket joints. 1 Ballast: Increase thickness of precast concrete sections or add concrete to base section, as required to prevent floatation. 2. Base Section. 6 -inch (150 -mm) minimum thickness for floor slab and 4 -inch (100 -mm) minimum thickness for walls and base riser section, and having a separate base slab or base section with integral floor 3 Riser Sections: 4 -inch (100 -mm) minimum thickness, 48 -inch (1220-min) diameter and lengths to provide depth indicated. 4 Top Section. Eccentric cone type, unless concentric cone or flat slab -top type is indicated. Top of cone of size that matches grade rings. 5 Gaskets: ASTM C 443 (ASTM C 443M), rubber 6 Grade Rings: Include 2 or 3 reinforced concrete rings, of 6- to 9 -inch (152 to 229 -mm) total thickness, that match a 24 -inch- (610 -mm-) diameter frame and cover 7 Steps: Fiber glass, individual steps or ladder Include a width that allows a worker to place both feet on one step and is designed to prevent lateral slippage off the step. Cast steps or anchor ladder into base, riser and top section sidewalls at 12- to 16 -inch (300 to 400 -mm) intervals. Omit steps for manholes less than 60 inches (1500 nun) deep. 8. Steps: ASTM C 478 (ASTM C 478M) individual steps or ladder Omit steps for manholes less than 60 inches (1500 min) deep. 9 Pipe Connectors: ASTM C 923 (ASTM C 923M), resilient, of size required, for each pipe connecting to base section. B. Manhole Frames and Covers: ASTM A 536, Grade 60- 40 -18, heavy -duty ductile iron. Include 24 -inch (610-nun) inside diameter by 7 to 9 -inch (178- to 229 -mm) riser with 4 -inch (100 mm) minimum width flange, and 26 -inch- (660 -mm-) diameter cover Include indented top design with lettering, equivalent to the following, cast into cover 1 Sanitary Sewerage Piping Systems: SANITARY SEWER. 2. Storm Drainage Piping Systems: STORM SEWER. 3 Piping Systems Containing Sanitary Sewage: SANITARY SEWER. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.6 CATCH BASINS SECTION 02700 PAGE 6 SEWERAGE AND DRAINAGE A. Precast Concrete Catch Basins: ASTM C 478 (ASTM C 478M), precast, reinforced concrete, of depth indicated, with provision for rubber gasket joints. 1 Base Section. 6 -inch (150 -mm) minimum thickness for floor slab and 4 -inch (100 -mm) s minimum thickness for walls and base riser section, and having a separate base slab or base section with integral floor 2. Riser Sections: 4 -inch (100 -mm) minimum thickness; 48 -inch (1220 -mm) diameter, and lengths to provide depth indicated. 3 Top Section. Eccentric cone type, unless concentric cone or flat slab -top type is indicated. Top of cone of size that matches grade rings. 4 Gaskets: ASTM C 443 (ASTM C 443M), rubber 5 Grade Rings: Include 2 or 3 reinforced-concrete rings, of 6- to 9 -inch (152- to 229 -mm) total thickness, that match a 24 -inch- (610 -mm diameter frame and grate. 6. Steps: Fiber glass, individual steps or ladder Include a width that allows a worker to place both feet on one step and is designed to prevent lateral slippage off the step. Cast steps or anchor ladder into base, riser and top section sidewalls at 12 to 16 -inch (300 to 400 -mm) intervals. Omit steps for catch basins less than 60 inches (1500 nun) deep. 7 Steps: ASTM C 478 (ASTM C 478M) individual steps or ladder Omit steps for catch basins less than 60 inches (1500 nun) deep. 8. Pipe Connectors: ASTM C 923 (ASTM C 923M), resilient, of size required, for each pipe connecting to base section. B Frames and Grates: ASTM A 536, Grade 60- 40 -18, heavy -duty ductile iron. Include 24 -by- 24 -inch (610 -by- 610 -mm) minimum flat grate with small square or short- slotted drainage openings. C Frames and Grates: ASTM A 536, Grade 60- 40 -18, heavy -duty ductile iron, 24 -inch (610 mm) inside diameter by 7 to 9 -inch (178- to 229 -mm) riser with 4 inch (100 minimum width flange, and 26 -inch- (660 nun diameter flat grate having small square or short- slotted drainage openings. 2.7 STORM WATER INLETS A. Frames and Grates: Heavy duty frames and grates according to utility standards. 2.8 CONCRETE A. General. Cast -in -place concrete according to ACI 318, ACI 350R, and the following: 1 Cement: ASTM C 150 Type II. 2. Fine Aggregate: ASTM C 33 sand. 3 Coarse Aggregate: ASTM C 33 crushed gravel. 4 Water Potable. B. Structures: Portland- cement design mix, 4000 psi (27 6 MPa) minimum, with 0 45 maximum water cement ratio. 1 Reinforcement Fabric: ASTM A 185 steel, welded wire fabric, plain. 2. Reinforcement Bars: ASTM A 615 Grade 60 (ASTM A 615M, Grade 400), deformed steel. MAHLUM NORDFORS MclaNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Structure Channels and Benches: Factory or field formed from concrete. Portland- cement design mix, 4000 psi (27.6 MPa) minimum, with 0 45 maximum water cement ratio. 1 Include channels and benches in manholes. 2. Include channels and benches in sanitary sewerage manholes. 3 Include channels and benches in sanitary sewerage and combined sanitary sewerage and storm drainage manholes. a. Manhole Channels: Concrete invert, formed to same width as connected piping, with height of the vertical sides to 3/4 of the pipe diameter Form curved channels with smooth, uniform radius and slope. 1) Invert Slope: 1.2 inches (30 mm) through manhole. 2) Invert Slope: 2.5 percent (1 40) through manhole. 3) Invert Slope: None. b. Manhole Benches: Concrete, sloped to drain into channel. 1) Slope: 1 inch per foot (1 12). 2) Slope: 0.5 inch per foot (1:24). 4 Include channels and benches in storm drainage catch basins. a. Catch Basin Channels: Concrete invert, formed to same width as connected piping, with height of the vertical sides to 3/4 of the pipe diameter Form curved channels with smooth, uniform radius and slope. 1) Invert Slope: 1.2 inches (30 mm) through catch basin. 2) Invert Slope: 2.5 percent (1 40) through catch basin. 3) Invert Slope: None. b Catch Basin Benches: Concrete, sloped to drain into channel. 1) Slope: 1 inch per foot (1 12). 2) Slope: 0.5 inch per foot (1.24). D Ballast and Pipe Supports: Portland cement design mix, 3000 psi (20 7 MPa) minimum, with 0.58 maximum water cement ratio. 1 Reinforcement Fabric: ASTM A 185 steel, welded wire fabric, plain. 2. Reinforcement Bars: ASTM A 615 Grade 60 (ASTM A 615M, Grade 400), deformed steel. 2.9 PROTECTIVE COATINGS SECTION 02700 PAGE 7 SEWERAGE AND DRAINAGE A. General. Include factory- or field applied protective coatings to structures and appurtenances according to the following: B. Coating: 1- or 2 -coat, coal -tar epoxy 15 -mil (0.381 -mm) minimum thickness, except where otherwise indicated. 1 Manholes: On interior surface. 2. Manholes: On exterior surface. 3 Manholes: On exterior and interior surfaces. 4 Brick Manholes: On interior surface. 5 Brick Manholes: Over parging on exterior surface. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 6 Brick Manholes: Over parging on exterior surface and on interior surface. 7 Manhole Frames and Covers: On entire surfaces. 8. Manhole Frames and Covers: On surfaces that will be exposed to sewer gases. 9 Catch Basins: On interior surface. 10 Catch Basins: On exterior surface. 11 Catch Basins: On exterior and interior surfaces. 12. Catch Basin Frames and Grates: On entire surfaces. 13 Storm -Water Inlets: On interior surface. 14 Storm -Water Inlets: On exterior surface. 15 Storm -Water Inlets: On exterior and interior surfaces. 16 Storm -Water Inlet Frames and Grates: On entire surfaces. 2.14 CLEANOUTS SECTION 02700 PAGE 8 SEWERAGE AND DRAINAGE A. Description. ASME A112.36.2M, round, cast -iron housing with clamping device and round, secured, scoriated, cast -iron cover Include cast -iron ferrule with inside calk or spigot connection and countersunk, tapered- thread, brass closure plug. Use units with top loading classifications according to the following applications: 1 Light Duty In earth or grass, foot traffic areas. 2. Medium Duty In paved, foot traffic areas. 3 Heavy Duty In vehicle- traffic service areas. 4 Extra Heavy Duty In roads. B Sewer Pipe Fitting and Riser to Cleanout: ASTM A 74 service class, cast -iron soil pipe and fittings. 2.15 DRAINS A. Area Drains: ASME A112.21 1M, round, cast -iron body with anchor flange and round, secured, cast -iron grate. Include bottom outlet with inside calk or spigot connection, of sizes indicated. Use units with top loading classifications according to the following applications: 1 Medium Duty In paved, foot traffic areas. 2. Heavy Duty In vehicle- traffic service areas. PART 3- EXECU11ON 3.1 EARTHWORK A. Excavating, trenching, and backfilling are specified in Division 2 Section "Earthwork." 3.2 IDENTIFICATION A. Materials and their installation are specified in Division 2 Section "Earthwork." Arrange for installation of green warning tapes directly over piping and at outside edges of underground structures. 1 Use warning tapes or detectable warning tape over ferrous piping. 2. Use detectable warning tape over nonferrous piping and over edges of underground structures. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.3 SEWERAGE PIPING APPLICATIONS A. General. Include watertight joints. B. Refer to Part 2 of this Section for detailed specifications for pipe and fitting products listed below Use pipe, fittings, and joining methods according to the following applications. C. Pipe Sizes 4 to 6 Inches (100 to 150 mm): Hub and spigot, extra -heavy class, cast -iron soil pipe and fittings; compression -type gaskets; and gasketed joints. D Pipe Sizes 4 and 6 Inches (100 and 150 mm) Polyvinyl chloride (PVC) sewer pipe and fittings; ASTM D 3034 SDR 35 for gasketed joints. E. Pipe Sizes 8 and 10 Inches (200 and 250 mm) Polyvinyl chloride (PVC) sewer pipe and fittings; ASTM D 3034 SDR 35 for gasketed joints. 3.4 DRAINAGE PIPING APPLICATIONS A. General. Include watertight joints. 3.5 SPECIAL PIPE COUPLING AND FITTING APPLICATIONS SECTION 02700 PAGE 9 SEWERAGE AND DRAINAGE B. Refer to Part 2 of this Section for detailed specifications for pipe and fitting products listed below Use pipe, fittings, and joining methods according to the following applications. C. Pipe Sizes 4 and 6 Inches (100 and 150 mm): ASTM D 3034 polyvinyl chloride (PVC) sewer pipe and fittings with gaskets and gasketed joints. D Pipe Sizes 8 to 15 Inches (200 to 375 mm) ASTM D 3034 polyvinyl chloride (PVC) sewer pipe and fittings with gaskets and gasketed joints. A. Special Pipe Couplings: Use where indicated and where required to join piping and no other appropriate method is specified. Do not use instead of specified joining methods. 1 Use the following pipe couplings for nonpressure applications: a. Strait- pattern, sleeve type to join piping, of same size, with small difference in outside diameters. b. Increaser /reducer- pattern, sleeve type to join piping of different sizes. c. Gasket type to join piping of different sizes where annular space between smaller piping's outside diameter and larger piping's inside diameter permits installation. d. Internal- expansion type to join piping with same inside diameter 2. Use pressure -type pipe couplings for force -main, pressure application joints. Include polyethylene (PE) encasement. B. Special Pipe Fittings: Use where indicated. Include polyethylene (PE) encasement. 3.6 INSTALLATION, GENERAL A. General Locations and Arrangements: Drawings (plans and details) indicate the general location and arrangement of underground sewerage and drainage systems piping. Location and arrangement of piping layout take into account many design considerations. Install piping as indicated, to extent practical. B Install piping beginning at low point of systems, true to grades and alignment indicated with unbroken continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02700 PAGE 10 SEWERAGE AND DRAINAGE sleeves, and couplings according to manufacturer's recommendations for use of lubricants, cements, and other installation requirements. Maintain swab or drag in line and pull past each joint as it is completed. C. Use manholes for changes in direction, except where fittings are indicated. Use fittings for branch connections, except where direct tap into existing sewer is indicated. D Use proper size increasers, reducers, and couplings, where different sizes or materials of pipes and fittings are connected. Reduction of the size of piping in the direction of flow is prohibited. E. Install gravity- flow systems piping at constant slope between points and elevations indicated. Install straight piping runs at constant slope, not less than that specified, where slope is not indicated. F Extend sewerage piping and connect to building's sanitary drains, of sizes and in locations indicated. Terminate piping as indicated. G. Install sewerage piping pitched down in direction of flow at minimum slope of 2 percent (1.50) and 36 -inch (1000 -mm) minimum cover except where otherwise indicated. H. Extend drainage piping and connect to building's storm drains, of sizes and in locations indicated. Terminate piping as indicated. I. Install drainage piping pitched down in direction of flow at minimum slope of 1 percent (1 100) and 36 -inch (1000 -mm) minimum cover except where otherwise indicated. J Extend combined sewerage and drainage piping and connect to building's combined, sanitary and storm drains, of sizes and in locations indicated. Terminate piping as indicated. K. Install combined sewerage and drainage piping pitched down in direction of flow at minimum slope of 1 percent (1 100) and 36 -inch (1000 -mm) minimum cover, except where otherwise indicated. L. Install force-main piping according to AWWA C600 1 Install piping between and connect to building's force main and termination point indicated. 2. Install piping between and connect to packaged sewage pump station outlet and termination point indicated. 3 Install piping with restrained joints at horizontal and vertical changes in direction. Use cast -in -place concrete supports and anchors, corrosion- resistant rods and clamps, or piping made with restrained-type-joint ends. 4 Install piping with 36 -inch (1000 -nun) minimum cover M. Tunneling: Install pipe under streets or other obstructions, that cannot be disturbed, by tunneling, jacking, or a combination of both. 3.7 PIPE JOINT CONSTRUCTION AND INSTALLATION A. General. Join and install pipe and fittings according to the following. B Hub and Spigot, Cast -Iron Soil Pipe and Fittings: With rubber compression gaskets according to CISPI "Cast Iron Soil Pipe and Fittings Handbook," Volume I. Use gaskets that match class of pipe and fittings. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02700 PAGE 11 SEWERAGE AND DRAINAGE 1 Install polyethylene film encasement over cast -iron soil pipe and fittings according to ASTM A 674 or AWWA C105 C. Polyvinyl Chloride (PVC)'Plastic Pipe and Fittings: As follows: 2. Join pipe and gasketed fittings with elastomeric seals according to ASTM D 2321 D System Piping Joints: Make joints using system manufacturer's couplings, except where otherwise specified. E. Join piping made of different materials or dimensions with couplings made for this application. Use couplings that are compatible with and fit both systems' materials and dimensions. 3.8 MANHOLE INSTALLATION A. General. Install manholes, complete with accessories, as indicated. B. Form continuous concrete channels and benches between inlets and outlet, where indicated. C Set tops of frames and covers flush with finished surface where manholes occur in pavements. Set tops 3 inches (76 mm) above finished surface elsewhere, except where otherwise indicated. D Place precast concrete manhole sections as indicated, and install according to ASTM C 891 1 Provide rubber joint gasket complying with ASTM C 443 (ASTM C 443M), at joints of sections. 2. Apply bituminous mastic coating at joints of sections. E. Construct brick manholes as indicated. F Construct cast -in -place manholes as indicated. 3.9 CATCH BASIN INSTALLATION A. Construct catch basins to sizes and shapes indicated. B Set frames and grates to elevations indicated. 3.10 STORM DRAINAGE INLET AND OUTFALL INSTALLATION A. Construct inlet head walls, aprons, and sides of reinforced concrete, as indicated. B. Construct outlet head walls, aprons, and sides of reinforced concrete, as indicated. C. Construct riprap of broken stone, as indicated. D Install outlets that spill onto grade, anchored with concrete, where indicated. E. Install outlets that spill onto grade, with flared end sections that match pipe, where indicated. F Construct energy dissipators at outlets, as indicated. 3.11 CONCRETE PLACEMENT A. Place cast -in -place concrete according to ACI 318, ACI 3508, and as indicated. MAHLUM NORDFORS McK1? LEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.12 DRAINAGE SYSTEM INSTALLATION SECTION 02700 PAGE 12 SEWERAGE AND DRAINAGE A. Assemble and install components according to manufacturer's written instructions and as indicated. B. Assemble and install components according to manufacturer's written instructions, ASME A112.3 1, and as indicated. C. Install with top surfaces of components, except piping, flush with final finished surface. D Assemble channel sections to form slope down toward drain outlets. Use sealants, adhesives, fasteners, and other materials recommended by system manufacturer E. Embed channel sections and appurtenances in a 4 -inch (100 -nun) minimum depth of concrete around bottom and sides. F Fasten grates to channel sections if indicated. G. Assemble trench sections with flanged joints. H. Embed trench sections and appurtenances in a 4 -inch (100 -mm) minimum depth of concrete around bottom and sides. I. Make piping connections and install stainless -steel piping with gasketed joints between system components. 3.13 CLEANOUT INSTALLATION A. Install cleanouts and riser extension from sewer pipe to cleanout at grade. Use cast -iron soil pipe fittings in sewer pipes at branches for cleanouts and cast -iron soil pipe for riser extensions to cleanouts. Install piping so cleanouts open in direction of flow in sewer pipe. B Set cleanout frames and covers in earth in a cast -in -place concrete block, 18 by 18 by 12 inches (450 by 450 by 300 mm) deep. Set with tops 1 inch (25 mm) above surrounding earth grade. C. Set cleanout frames and covers in concrete paving with tops flush with surface of paving. 3.14 DRAIN INSTALLATION A. Install type drains in locations indicated. B Embed drains in a 4 -inch (100-nun) minimum depth of concrete around bottom and sides. C Fasten grates to drains if indicated. D Set drain frames and covers with tops flush with surface of paving. 3.15 TAP CONNECTIONS A. Make connections to existing piping and underground structures so finished work conforms as nearly as practical to requirements specified for new work. B Use commercially manufactured wye fittings for piping branch connections. Remove section of existing pipe, install wye fitting into existing piping, and encase entire wye fitting plus 6- inch (150 -mm) overlap, with not less than 6 inches (150 nun) of 3000 -psi (20 7 -MPa), 28-day compressive strength concrete. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02700 PAGE 13 SEWERAGE AND DRAINAGE C. Make branch connections from side into existing piping, sizes 4 to 20 inches (100 to 500 mm) by removing a section of existing pipe and installing a wye fitting into existing piping. Encase entire wye with not less than 6 inches (150 mm) of 3000 -psi (20 7 -MPa), 28-day compressive strength concrete. D Make branch connections from side into existing piping, sizes 24 inches (600 mm) or larger or to underground structures by cutting an opening into existing unit large enough to allow 3 inches (76 mm) of concrete to be packed around entering connection. Cut end of connection pipe passing through pipe or structure wall to conform to shape of and be flush with inside wall, unless otherwise indicated. On outside of pipe or structure wall, encase entering connection in 6 inches (150 mm) of concrete for a minimum length of 12 inches (300 nun) to provide additional support of collar from connection to undisturbed ground. 1 Use concrete that will attain a minimum 28-day compressive strength of 3000 psi (20 7 MPa), unless otherwise indicated. 2. Use epoxy bonding compound as an interface between new and existing concrete and piping materials. E. Protect existing piping and structures to prevent concrete or debris from entering while making tap connections. Remove debris or other extraneous material that may accumulate. 3.16 CLOSING ABANDONED SEWERAGE AND DRAINAGE SYSTEMS A. Abandoned Piping: Close open ends of abandoned underground piping that is indicated to remain in place. Include closures strong enough to withstand hydrostatic and earth pressures that may result after ends of abandoned piping have been closed. Use either of the following procedures: 1 Close open ends of piping with at least 8 -inch- (200 -mm-) thick brick masonry bulkheads. 2. Close open ends of piping with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of material being closed. Do not use wood plugs. B Abandoned Structures: Excavate around structure as required and use either of the following procedures: 1 Remove structure and close open ends of remaining piping. 2. Remove top of structure down to at least 36 inches (1000 mm) below final grade. Fill to within 12 inches (300 mm) of top with stone, rubble, gravel, or compacted dirt. Fill to top with concrete. 3 Backfill to grade according to Division 2 Section "Earthwork. 3.17 FIELD QUALITY CONTROL A. Clear interior of piping and structures of dirt and superfluous material as the work progresses. Maintain swab or drag in piping and pull past each joint as it is completed. 1 In large, accessible piping, brushes and brooms may be used for cleaning. 2. Place plug in end of incomplete piping at end of day and whenever work stops. 3 Flush piping between manholes and other structures, if required by authorities having jurisdiction, to remove collected debris. B Inspect interior of piping to determine whether line displacement or other damage has occurred. Inspect after approximately 24 inches (600 mm) of backfill is in place, and again at completion of the Project. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02700 PAGE 14 SEWERAGE AND DRAINAGE 1 Submit separate reports for each system inspection. 2. Defects requiring correction include the following: a. Alignment: Less than full diameter of inside of pipe is visual between structures. b. Deflection. Flexible piping with deflection that prevents passage of a ball or cylinder of a size not less than 92.5 percent of piping diameter. c. Crushed, broken, cracked, or otherwise damaged piping. d. Infiltration. Water leakage into piping. e. Exfiltration. Water leakage from or around piping. 3 Replace defective piping using new materials and repeat inspections until defects are within allowances specified. 4 Reinspect and repeat procedure until results are satisfactory C. Test new piping systems and parts of existing systems that have been altered, extended, or repaired for leaks and defects. 1 Do not enclose, cover or put into service before inspection and approval. 2. Test completed piping systems according to authorities having jurisdiction. 3 Schedule tests, and their inspections by authorities having jurisdiction, with at least 24 hours' advance notice. 4 Submit separate reports for each test. 5 Sanitary and Storm Drain Sewerage: Perform Low pressure Air Test. Test shall be in accordance with the Washington State Department of Transportation Standard Specifications for Roads, Bridges and Municipal Construction 1996 Edition, Section 7 17.3(4) D and the 1995 Edition of the City of Port Angeles Urban Services Standards and Guidelines. 6 Manholes: Perform hydraulic test according to ASTM C 969 (ASTM C 969M). 7 Leaks and loss in test pressure constitute defects that must be repaired. 8. Replace leaking piping using new materials and repeat testing until leakage is within allowances specified. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 02700 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02711 PAGE 1 FOUNDATION DRAINAGE SYSTEMS PART GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary c onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes foundation, subsoil drainage systems. B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 2 Section "Earthwork" for excavating, trenching, and backfilling. 2. Division 2 Section "Sewerage and Drainage" for connections to storm drainage systems. 3 Division 3 Section "Cast -in -Place Concrete" for concrete cleanout anchors. 4 Division 7 Section "Bentonite Waterproofing." 5 Division 15 Section "Plumbing Piping" for connections to building storm drains. 6. Division 15 Section "Drainage and Vent Systems" for connections to building storm drains. 1.3 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B Product data for the following: 1 Solid pipe for tight joints. 2. Perforated piping. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed foundation drainage systems similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance. 1.5 COORDINATION A. Coordinate foundation drainage system installation with excavating, trenching, and backfilling. B. Coordinate drainage panel installation with waterproofing of walls below grade. C. Coordinate piping termination with storm drainage system. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: B Products: Subject to compliance with requirements, provide one of the following: MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1 Drainage Conduits: a. AvanEDGE, Advanced Drainage Systems, Inc. b. Form -A- Drain; CeitainTeed Corp. Pipe Plastics Group. 2.2 PIPES AND FITTINGS A. General. Include pipes, fittings, couplings, and joint materials. 2.3 SPECIAL PIPE COUPLINGS SECTION 02711 PAGE 2 FOUNDATION DRAINAGE SYSTEMS B. Polyvinyl Chloride (PVC) Sewer Pipe and Fittings: ASTM D 3034 SDR 35 bell and spigot ends, for gasketed joints. 1 Gaskets: ASTM F 477 elastomeric seal. C. Perforated, Polyvinyl Chloride (PVC) Sewer Pipe and Fittings: ASTM D 2729 bell and spigot ends, for loose joints. A. Description. Rubber or elastomeric sleeve and band assembly fabricated to match outside diameters of pipes to be joined. Include the following specific sleeve materials, where available: 1 Cast -Iron Soil Pipe: ASTM C 564 rubber 2. Concrete Pipe: ASTM C 443 rubber 3 Clay Pipe: ASTM C 425 rubber 4 Plastic Pipe: ASTM F 477 elastomeric seal. 5 Dissimilar Pipes: Compatible with pipe materials being joined. 6 Bands: Stainless steel, at least 1 at each pipe insert. 2.4 CLEANOUTS A. Description. ASME Al12.36.2M, with round flanged, cast -iron housing, and secured, scoriated, Medium -Duty Loading class, cast -iron cover Include cast -iron ferrule and countersunk, brass cleanout plug. 2.5 SLEEVES A. Mechanical Sleeve Seals: Modular and watertight. Include interlocking rubber links shaped to fill annular space between pipe and sleeve and connecting bolts and pressure plates. 2.6 SOIL MATERIALS A. Impervious Fill. Clayey gravel and sand mixture capable of compacting to dense state. B. Drainage Fill. Washed, evenly graded mixture of crushed stone, or crushed or uncrushed gravel, ASTM D 448, coarse aggregate, Size No. 57 with 100 percent passing 1 -1/2 -inch sieve and not more than 5 percent passing No. 8 sieve. C. Filtering Material. Evenly graded mixture of natural or crushed gravel or crushed stone and natural sand, with 100 percent passing 1 -1/2 -inch sieve and 0 to 5 percent passing No. 50 sieve. D Flowable Fill. Low- strength, flowable slurry with 115- to 145- lb /cu. ft. density Include the following: 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION 3.1 EXAMINATION 3.2 FOUNDATION DRAINAGE SYSTEM APPLICATIONS 3.3 SPECIAL PIPE COUPLING APPLICATIONS 3.4 PIPING INSTALLATION SECTION 02711 PAGE 3 FOUNDATION DRAINAGE SYSTEMS 1 Mixture: ASTM C 150 Type I, portland cement; ASTM C 33 fine aggregates; ASTM C 618 fly -ash mineral admixture; and ASTM C 94 mixing water 2. Mixture: ASTM C 150, Type I, portland cement; ASTM C 33 natural sand and fine aggregates, natural or crushed gravel or crushed stone; and ASTM C 94 mixing water 3 Strength. Approximately 100 psi at 28 days. 4 Strength. 100 to 200 psi at 28 days. E. Roofing Felts: ASTM D 226, Type I, asphalt- saturated; or ASTM D 227 coal- tar saturated, organic felt. F Matting: Geotextile filter fabric, in 1 or more layers, for minimum total weight of 6 oz. /sq. yd. A. Examine surfaces and areas for suitable conditions where foundation drainage systems are to be installed. Do not proceed until unsatisfactory conditions have been corrected. A. Systems with 4 -Inch Piping: As follows: 1 Perforated, polyvinyl chloride (PVC) sewer pipe and fittings for loose, bell- and spigot joints. A. Use where indicated and where required to join piping and no other appropriate method is specified. Do not use instead of specified joining methods. A. Drawing plans and details indicate general location and arrangement of foundation drainage system piping. B. Install piping beginning at low points of system, true to grades and alignment indicated, with unbroken continuity of invert. Bed piping with full bearing, solidly in filtering material. Install gaskets, seals, sleeves, and couplings according to manufacturer's written instructions and other requirements indicated. 1 Install piping pitched down in direction of flow at a minimum slope of 1 percent and with a minimum cover of 36 inches, except where otherwise indicated. 2. Lay open joint tile spaced as indicated on Drawings or, if not indicated, with 1/4 -inch space between ends. Cover top 2/3 of joint opening with joint screening material and tie with corrosion resistant wire. 3 Provide recesses in excavation bottom to receive bells of pipe bell ends. Lay pipe with bells facing upslope and with spigot end entered fully into adjacent bell. 4 Apply and compact impervious fill material to raise low areas or where unsatisfactory bearing soil may occur C. Use increasers, reducers, and couplings made for different sizes or materials of pipes and fittings being connected. Reduction of pipe size in direction of flow is prohibited. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS D Maintain swab or drag in piping with tight joints and pull past each joint as it is completed. E. Extend piping and connect to storm drainage system, of sizes and in locations indicated. Terminate piping as indicated. 3.5 PIPE JOINT CONSTRUCTION AND INSTALLATION A. General. Join and install pipe and fittings as indicated and according to the following. B. Polyvinyl Chloride (PVC) Pipe and Fittings: As follows: 1 Join ASTM D 3034 sewer pipe and fittings with elastomeric seal gaskets according to ASTM D 2321 2. Join ASTM D 2729 perforated, sewer pipe and fittings with loose, bell- and spigot joints. 3 Install according to ASTM D 2321 4 Install perforated pipe with perforations down. C. System Piping Joints: Make joints using system manufacturer's seals and couplings, except where otherwise specified. 3.6 CLEANOUT INSTALLATION SECTION 02711 PAGE 4 FOUNDATION DRAINAGE SYSTEMS D Join piping made of different materials and dimensions with special couplings made for this application. Use couplings that are compatible with and that fit both pipe materials and dimensions. A. Install cleanouts and riser extensions from foundation drainage piping to cleanouts at grade. Use Service class, cast -iron soil pipe and fittings for foundation drainage piping branch fittings and riser extensions to cleanouts. Install fittings so cleanouts open in direction of flow in piping. B. Set cleanout frames and covers in earth in a cast -in -place concrete anchor, 18 by 18 by 12 inches deep. Set with tops 1 inch above surrounding earth grade. C. Set cleanout frames and covers in concrete paving with tops flush with paving surface. 3.7 SLEEVE INSTALLATION A. Install sleeves in locations and at elevations indicated. 3.8 DRAINAGE CONDUIT INSTALLATION A. Install according to manufacturer's written instructions and as indicated. Coordinate placement with other foundation drainage materials. 1 Comply with manufacturer's written instructions for securing drainage conduits to substrate. Use adhesives and mechanical fasteners recommended by manufacturer Protect installed conduits during backfilling. 2. Do not use drainage conduits as protection over waterproof membrane, unless otherwise approved by waterproofing membrane manufacturer 3.9 SOIL MATERIAL INSTALLATION A. Impervious Fill at Footings: Place impervious fill material on subgrade adjacent to bottom of footing after concrete footings have been cured and forms removed. Place and compact impervious fill to dimensions indicated but not less than 6 inches deep and 12 inches wide. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.10 FIELD QUALITY CONTROL 0 1997 Mahlum Nordfors McKinley Gordon SECTION 02711 PAGE 5 FOUNDATION DRAINAGE SYSTEMS B. Filtering Material. Place supporting layer of filtering material over compacted subgrade where drainage pipe is to be laid to depth indicated or, if not indicated, to compacted depth of not less than 4 inches. C. Drainage Fill. Place fill over drain piping after satisfactory testing and covering with filtering material. Cover piping to width of at least 6 inches on each side and above top of pipe to within 12 inches of finish grade. Place fill material in layers not exceeding 3 inches in loose depth, and compact each layer placed. 1 Place 1 layer of asphalt- or tar- saturated, roofing felt or synthetic drainage fabric, overlapping edges at least 4 inches, over drainage fill material. D Flowable Fill. Mix according to manufacturer's reconunendations. Place fill over drain piping after satisfactory testing and covering with filtering material. Cover piping to width of at least 6 inches on each side and above top of pipe to within 12 inches of finish grade. 1 Place 1 layer of asphalt- or tar- saturated, roofing felt or synthetic drainage fabric, overlapping edges at least 4 inches, over flowable fill material. E. Fill to Grade: Place impervious fill material over compacted drainage fill. Place material in loose -depth layers not exceeding 6 inches. Thoroughly compact each layer Fill to finish elevations and slope away from building. F Fill to Grade: Place impervious fill material over flowable fill mix. Place material in loose depth layers not exceeding 6 inches. Thoroughly compact each layer Fill to finish elevations and slope away from building. A. Testing: Test drain piping with water or visually check piping to ensure free flow before backfilling. Remove obstructions, replace damaged components, and repeat test until results are satisfactory 1 Place additional filtering material to depth of 4 inches around sides and top of drains after testing. END OF SECTION 02711 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIaNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY SECTION 02810 PAGE 1 IRRIGATION SYSTEMS A. Drawings and general provisions of the Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. A. This Section includes a complete, fully functioning bidder designed modification and extension of the existing irrigation system including valves, piping, sprinters, specialties, accessories, controls, and wiring. B Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 2 Section "Water Systems" for water supply 2. Division 2 Section `Landscaping' for plant materials to be irrigated. 1.3 DEFINITIONS A. Pipe sizes used in this Section are nominal pipe size (NPS) in inches. Tube sizes are Standard size in inches. Equivalent SI (metric) sizes are indicated in millimeters (min) in parentheses. B Supply Piping: Piping from water source to connection to irrigation system pressure piping. Piping is under same pressure as water supply Piping in this category is not included in this Section. C. Pressure Piping: Piping downstream from supply piping to and including control valves. Piping is under irrigation system pressure. Piping in this category includes pressure regulators, water meters, and backflow preventers, when,used. D Circuit Piping: Piping downstream from control valves to irrigation system sprinklers, emitters, devices, and drain valves. Piping is under pressure (less than pressure piping) during flow E. Control Valve: Manual or automatic (electrically operated) valve for control water flow to irrigation system zone. F Drain Piping: Downstream from circuit piping drain valves. Piping is not under pressure. G. Drain Valve: Manual or automatic (pressure operated) drain valve for draining of irrigation system circuit piping. 1.4 SYSTEM PERFORMANCE REQUIREMENTS A. Minimum Water Coverage: Not less than. 1 Turf Areas: 100 percent. 2. Other Planting Areas: 100 percent. B Components and Installation. Capable of producing piping systems with the following minimum working pressure ratings except where indicated otherwise. 1 Pressure Piping: 150 psig (1035 kPa). 2. Circuit and Drain Piping: 100 psig (690 kPa). MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.5 SUBMITTALS A. General. Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B Product data including pressure rating, rated capacity settings, and electrical data of selected models for the following: 1 Pressure regulators. 2. Valves, including general -duty underground, manual and automatic control, and quick coupler types, and valve boxes. 3 Sprinklers, including emitters, drip tubes, and devices. 4 Controls, including controller wiring diagrams. 5 Wiring. 6 Area drains. C. Wiring diagrams for electrical controllers, valves, and devices. SECTION 02810 PAGE 2 IRRIGATION SYSTEMS D Maintenance data for inclusion in "Operating and Maintenance Manual' specified in Division 1 Section "Contract Closeout" for the following: 1 Pressure regulators. 2. Automatic control valves. 3 Sprinklers. 4 Controllers. E. Shop drawings showing layout of new irrigation system and how it ties in with existing irrigation system. Show all regulators, valves, heads, controls, coverage pattern, and piping. F As -Built drawings per Division 1, Section `Contract Closeout' 1.6 QUALITY ASSURANCE A. Comply with requirements of utility supplying water for prevention of backflow and backsiphonage. B. Comply with requirements of authority with jurisdiction for irrigation systems. C. Installer Qualifications: Engage an experienced Installer who has completed irrigation systems similar in material, design, and extent to that indicated for Project that have resulted in construction with a record of successful in- service performance. D Listing/Approval Stamp, Label, or Other Marking: On equipment, specialties, and accessories made to specified standards. E. Listing and Labeling: Equipment, specialties, and accessories that are listed and labeled. 1 The Terms "Listed" and "Labeled" As defined in "National Electrical Code," Article 100 2. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" (NRTL) as defined in OSHA Regulation 1910 7 F Product Options: Irrigation system piping, specialties, and accessories are based on specific types, manufacturers, and models indicated. Components with equal performance MAHLUM NORDFORS McICINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.7 PROJECT CONDITIONS 1.9 EXTRA MATERIALS SECTION 02810 PAGE 3 IRRIGATION SYSTEMS characteristics produced by other manufacturers may be considered, provided deviations in dimensions, operation, and other characteristics do not change design concept or intended performance as judged by the Architect. The burden of proof of product equality is on the Contractor Refer to Division 1 Section "Product Substitutions." A. Fully investigate existing conditions at site including head locations, control panels, and valve boxes. Examine site in the presence of Olympic Memorial Hospital maintenance engineering staff. Examine existing record drawings and O &M manuals at Olympic Memorial Hospital maintenance engineering offices (copies are not available for distribution.) Phone (360) 417 7170 to make arrangements to view existing documents. B Research public utility records, and verify existing utility locations. Verify that irrigation system piping may be installed in compliance with original design and referenced standards. 1.8 SEQUENCING AND SCHEDULING A. Coordinate irrigation systems work with landscape work specified in Division 2 Section "Landscape Work." A. Deliver extra materials to Owner Furnish extra materials matching products installed as described below Package them with protective covering for storage and label clearly describing contents. 1 Quick Couplers: Furnish quantity of units equal to 10 percent of amount of each size installed. 2. Sprinklers: Furnish quantity of units equal to 10 percent of amount of each type installed. 3 Emitters, Drip Tube, and Devices: Furnish quantity of units equal to 10 percent of amount of each type installed. 4 Valve Keys: Furnish quantity of tee -handle units equal to 25 percent of amount of each type key operated, control valve installed. 5 Quick- Coupler Hose Swivels: Furnish quantity of units equal to 25 percent of amount of each type quick coupler installed. 6. Quick Coupler Operating Keys: Furnish quantity of units equal to 25 percent of amount of each type quick coupler installed. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1 Gate Valves for Underground Installation. a. American Darling Valve Div American Cast Iron Pipe Co. b. Clow Valve Co. Div McWane, Inc. c. Kennedy Valve Div McWane, Inc. d. Stockham Valves Fittings, Inc. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS e. Waterous Co. 2. Corporation Stops for Underground Installation. a. Ford Meter Box Co. Inc. b. Hays Div Romac Industries. c. A.Y McDonald Mfg. Co. d. Mueller Co. Grinnell Corp. 3 Valves for Aboveground and Pit Installation. a. Grinnell Supply Sales Co. Grinnell Corp. b. Nibco, Inc. c. Hammond Valve Div Prairie Manufacturing Corp. d. Red -White Valve Corp. e. Stockham Valves Fittings, Inc. f. Watts Regulator Co. 4 Automatic Control Valves: a. Buckner Inc. b. Imperial Underground Sprinkler Co. c. L.R. Nelson Corp. d. Rain Bird Sprinkler Mfg. Corp. e. Toro Co. f. Weather -matic Sprinkler Div Telsco Industries. 5 Control Valve Boxes: a. Ametek by Plymouth Products Div AMETEK. b. Brooks Products, Inc. Polyplastics Div c. Carson Industries, Inc. d. Pepco Water Conservation Products, Inc. 6 Quick Couplers: a. Buckner Inc. b L.R. Nelson Corp. c. Rain Bird Sprinkler Mfg. Corp. d. Toro Co. e. Weather matic Sprinkler Div Telsco Industries. 7 Sprinklers: a. Buckner, Inc. b. Hunter Industries. c. L.R. Nelson Corp. d. Rain Bird Sprinkler Mfg. Corp. e. Toro Co. f. Weather matic Sprinkler Div Telsco Industries. SECTION 02810 PAGE 4 IRRIGATION SYSTEMS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIC NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.5 VALVES 8. Controllers: a. Buckner, Inc. b. L.R. Nelson Corp. c. Rain Bird Sprinkler Mfg. Corp. d. Toro Co. e. Weather -matic Sprinkler Div Telsco Industries. 2.2 PIPES AND TUBES SECTION 02810 PAGE 5 IRRIGATION SYSTEMS A. Refer to Part 3 Article "Piping Applications" for identification of systems where pipe and tube materials specified below are used. 1 B Polyvinyl Chloride (PVC) Plastic Pipe: ASTM D 1785 PVC 1120, Schedule 40 160 psig (1100 kPa) minimum pressure rating for 8 -inch (200mm) and smaller sizes, with plain ends. C. Polyvinyl Chloride (PVC) Plastic Pipe: ASTM D 1785 PVC 1120 Schedule 80 250 psig (1725 kPa) minimum pressure rating for 8 -inch (200mm) and smaller sizes, with plain and threaded ends. D Polyvinyl Chloride (PVC) Plastic Pipe: ASTM D 2241 PVC 1120 SDR 21, 200 psig (1380 kPa) minimum pressure rating, with plain ends. 2.3 PIPE AND TUBE FITTINGS A. Refer to Part 3 Article "Piping Applications" for identification of systems where pipe and tube fitting materials specified below are used. B Polyvinyl Chloride (PVC) Plastic Pipe Fittings: ASTM D 2466 Schedule 40 socket -type. 2.4 JOINING MATERIALS A. Refer to Division 15 Section "Basic Mechanical Materials and Methods" for joining materials not included in this Section. B. Solvent Cement: ASTM F 656 primer and ASTM D 2564 solvent cement in color other than orange. C Gaskets for Plastic Flanged Joints: Materials recommended by plastic pipe and fittings manufacturer A. General. Valves are for general -duty and underground applications. Refer to "Valve Applications" Article for locations of various valve types specified in this Article. Refer to 'Control Valves" Article for control valves and accessories and "Backflow Preventers" Article for backflow preventer valves. B. Plastic Valves: Polyvinyl chloride (PVC) plastic, with 150 psig (1035 kPa) minimum pressure rating, ends compatible with piping where valve is to be installed, and stem nut. C. Bronze, Nonrising Stem Gate Valves, 2 Inches (50 mm) and Smaller MSS SP -80, Type 1 solid wedge; nonrising, copper- silicon -alloy stem; Class 125 body and screw bonnet of ASTM B 62 cast bronze, with threaded or solder joint ends. Include polytetrafluoroethylene (PTFE) impregnated packing, brass packing gland, and malleable -iron handwheel. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Plastic Valves: Polyvinyl chloride (PVC) plastic, with 150 psig (1035 kPa) minimum pressure rating, ends compatible to piping where valve is to be installed, and tee handle. 2.6 CONTROL VALVES A. Description. Manufacturer's standard control valves for circuits, of type and size indicated, and as follows: 1 Provide cast bronze bodies, unless otherwise indicated. 2. Manual Control Valves: MSS SP -80 Class 125 globe valves. 3 Key Operated, Manual Control Valves: MSS SP -80 Class 125 globe valves, fitted for key operation. 4 Automatic Control Valves: Diaphragm -type, normally closed, with manual flow adjustment, and operated by 24- volt -a.c. solenoid. 5 Automatic Drain Valves: Designed to open for drainage when line pressure drops below 3 psig (20 kPa). 6 Quick- Couplers: Factory- fabricated, 2 -piece assembly Include coupler water -seal valve; removable upper body with spring- loaded or weighted, rubber covered cap; hose swivel with ASME B1.20 7 3/4- 11.5NH threads for garden hose on outlet; and operating key a. Locking Top Option. Include vandal- resistant, locking feature with 2 matching keys. B Control Valve Boxes: Polyethylene (PE), acrylonitrile- butadiene styrene (ABS), fiberglass, polymer concrete, or precast concrete box and cover Size as required for application. 1 Drainage Backfill. Cleaned gravel or crushed stone, graded from 7/8 inch (16 mm) maximum to 1/4 inch (6 mm) minimum. C Service Boxes for Key Operated Control Valves: Cast -iron box with telescoping top section of length required for depth of bury of valve. Include cover with lettering "WATER," and bottom section with base of size to fit over curb stop and barrel approximately 3 inches (75 mm) in diameter 1 Include valve key 36 inches (915 mm) long with tee handle and key end to fit valve. 2.7 SPRINKLERS A. Description. Manufacturer's standard sprinklers designed to provide uniform coverage over entire area of spray shown on Drawings at available water pressure, as follows: 1 Housings: Brass or plastic, except where material is specified. 2.8 AUTOMATIC CONTROL SYSTEM SECTION 02810 PAGE 6 IRRIGATION SYSTEMS A. Description. Low voltage controller system, made for control of irrigation system automatic control valves, and compatible with existing controller system. Controller operates on 120 volts a.c. building power system, provides 24 volts a.c. power to control valves. Add stations to the existing controller system for at least the number of control valves required. Increase controller system capacity with supplementary panel if necessary B. Interior Control Enclosures: Drip -proof enclosure with locking cover and 2 matching keys. Enclosure construction complies with NFPA 70 and NEMA 250 Type 12. 1 Material. Enameled steel, sheet metal. 2. Mounting: Surface -type for wall mounting. 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02810 PAGE 7 IRRIGATION SYSTEMS C. Transformer Internal -type, and suitable for converting 120 volts a.c. building power to 24 volts a.c. power D Controller Stations for Atitomatic Control Valves: Each station is variable from approximately 5 to 60 minutes. Include switch for manual or automatic operation of each station. E. 'Timing Device: Adjustable, 24 -hour 14-day clock to operate any time of day Include provision for the following settings: 1 Setting to skip operation any day in timer period. 2. Setting for operation every other day 3 Settings for operation 2 or more times daily 4 Include manual or semi- automatic operation without disturbing preset automatic operation. 5 Provide NI -CAD battery and trickle charger to automatically power the timing device during power outages. F Wiring: UL 493 solid copper conductor insulated cable, suitable for direct burial. 1 Feeder Circuit Cables: Type UF No. 12 AWG minimum, between building and controllers. 2. Low Voltage, Branch Circuit Cables: Type UF No. 14 AWG minimum, between controllers and automatic control valves. Jacket color is other than feeder circuit -cable jacket color Furnish cables with jackets of different colors for multiple cable installation in same trench. 3 Splicing Materials: Pressure sensitive thermoplastic tape and other materials required to make specified connections. All below grade splices shall be protected by 3M DBY or DBR splice kits. 2.9 PRESSURE GAGES A. Pressure Gages: ASME B40 1 4 -1/2 -inch (115 mm) diameter dial, with dial range of 2 times system operating pressure and bottom outlet. PART 3 EXECUTION 3.1 EXAMINATION A. Investigate and determine available water supply water pressure and flow characteristics. 3.2 PREPARATION A. Set stakes to identify proposed sprinkler locations. Obtain Architect's approval before excavation. 3.3 EARTHWORK A. Excavation, trenching, and backfilling are specified in Division 2 Section "Earthwork." B Underground warning tape installation is specified in Division 2 Section "Earthwork." 3.4 PAVING WORK A. Cutting and patching of asphalt paving is specified in Division 2 Section "Hot -Mixed Asphalt Paving." MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02810 PAGE 8 IRRIGATION SYSTEMS B. Cutting and patching of concrete paving is specified in Division 2 Section "Portland Cement Concrete Paving." C. Install piping in sleeves where crossing sidewalks, roadways, parking lots, and railroads. 1 Install piping sleeves by boring or jacking under existing paving, where possible. 3.5 PIPIN G APPLICATIONS A. Use pipe, tube, fittings, and joining methods according to the following applications. B Pressure Piping Underground. Use the following: 1 3 Inches (80 mm) and Smaller ASTM D 2241, SDR 17 polyvinyl chloride (PVC) plastic pipe; ASTM D 2467 Schedule 80, PVC plastic, socket -type pipe fittings; and solvent- cemented joints. C. Circuit Piping: Use the following: 1 All Sizes: ASTM D 1785 Schedule 40 polyvinyl chloride (PVC) plastic pipe; ASTM D 2466, Schedule 40, PVC plastic, socket -type fittings; and solvent cemented joints. 2. All Sizes: ASTM D 2241, SDR 17 or 21, polyvinyl chloride (PVC) plastic pipe; ASTM D 2466, Schedule 40 PVC plastic, socket -type fittings; and solvent- cemented joints. D Branches and Offsets at Sprinklers and Devices: ASTM D 1785 Schedule 80 polyvinyl chloride (PVC) plastic pipe with threaded ends; ASTM D 2464 Schedule 80 PVC plastic, threaded fittings; and threaded joints. E. Drain Piping: ASTM D 2241 SDR 21 or 26, polyvinyl chloride (PVC) plastic pipe; ASTM D 2466, Schedule 40 PVC plastic, socket -type fittings; and solvent- cemented joints. F Sleeves: ASTM D 1785 Schedule 40, polyvinyl chloride (PVC) plastic pipe; ASTM D 2466 Schedule 40 PVC plastic, socket -type fittings; and solvent cemented joints. 3.6 JOINT CONSTRUCTION A. Threaded Joints: Thread pipes with tapered pipe threads according to ASME B 1.20 1, apply tape or joint compound, and apply wrench to valve ends into which pipes are being threaded. B Polyvinyl Chloride (PVC) Piping Solvent Cemented Joints: Construct joints according to ASTM D 2672 and ASTM D 2855 1 Handling of Solvent Cements, Primers, and Cleaners: Comply with procedures in ASTM F 402 for safe handling when joining plastic pipe and fittings with solvent cements. C. Dissimilar Materials Piping Joints: Construct joints using adapters that are compatible with both piping materials, outside diameters, and system working pressure. Refer to "Piping Systems Common Requirements" Article for joining dissimilar metal piping. 3.7 PIPING SYSTEMS COMMON REQUIREMENTS A. General Locations and Arrangements: Indicate on shop drawings general location and arrangement of piping systems. Use indicated locations and arrangements to size pipe and calculate friction loss. Install piping as indicated, except where deviations to layout are approved by the Architect. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02810 PAGE 9 IRRIGATION SYSTEMS B. Install piping at a uniform slope of 6 inches per 100 feet (1:200) minimum, down to drain points. C. Install components having pressure rating equal to or greater than system operating pressure. D Install piping free of sags and bends. E. Locate groups of pipes parallel to each other, spaced to permit valve servicing. F Install fittings for changes in direction and branch connections. G. Piping Connections: Except as otherwise indicated make piping connections as specified below 1 Install unions, in piping 2 inches (50 min) and smaller adjacent to each valve and at final connection to each piece of equipment having 2 -inch (50 mm) or smaller threaded pipe connection. 2. Install flanges, in piping 2 1/2 inches (65 mm) and larger, adjacent to flanged valves and at final connection to each piece of equipment having flanged pipe connection. 3 Install dielectric fittings to connect piping of dissimilar metals. 3.8 PIPING INSTALLATION A. Install underground polyvinyl chloride (PVC) plastic pipe according to ASTM D 2774 B Lay piping on solid subbase, uniformly sloped without humps or depressions. 1 Slope circuit piping down toward drain valve minimum of 1/2 inch in 10 feet (1.240). 2. Install polyvinyl chloride (PVC) plastic pipe in dry weather when temperature is above 40 deg F (4 deg C). Allow joints to cure at least 24 hours at temperature above 40 deg F (4 deg C) before testing, unless otherwise recommended by manufacturer C. Drain Pockets: Excavate to sizes required. Backfill with cleaned gravel or crushed stone, graded from 7/8 inch (16 nun) to 1/4 inch (6 mm) minimum, drain material to 12 inches (300 min) below grade. Cover drain material with sheet of ASTM D 226, Type II, asphalt saturated felt and backfill remainder with excavated material. D Minimum Cover Provide following minimum cover over top of buried piping: 1 Pressure Piping: Greater depth of minimum of 24 inches (600 mm) below finished grade, or not less than 18 inches (460 mm) below average local frost depth. 2. Circuit Piping: 12 inches (300 mm). 3 Drain Piping: 12 inches (300 min). 4 Sleeves: 24 inches (600 mm). E. Tunneling: Install pipe under streets or other obstructions that cannot be disturbed, by tunneling, boring, or jacking. F Install piping under sidewalks and paving in sleeves. 3.9 VALVE APPLICATIONS A. Indicate on shop drawings valve types to be used. Where specific valve types are not indicated, following requirements apply. MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.11 BACKFLOW PREVENTER INSTALLATION 3.12 PRESSURE REGULATOR INSTALLATION 3.13 SPRINKLER INSTALLATION 3.14 AUTOMATIC CONTROL SYSTEM INSTALLATION SECTION 02810 PAGE 10 IRRIGATION SYSTEMS 1 Buried Valves 2 Inches (50 nun) and Smaller Bronze -body curb stop, with tee head, service box and shutoff rod. 3.10 VALVE INSTALLATION A. Valves: Install underground valves in valve boxes or pits. B. Curb Stops: Install underground curb stops in service boxes. C. Control Valves: Install in valve control valve boxes, arranged for easy adjustment and removal. Install union on downstream side. A. Install backflow preventers of type, size, and capacity required. Include valves and test cocks. Install according to plumbing code and health department authorities with jurisdiction. B Install pressure -type vacuum breakers minimum of 12 inches above the highest head served by the downstream piping system. C. Do not install bypass around backflow preventer D Do not install backflow preventers with drains or vents in pits or areas subject to flooding. E. Support backflow preventers, valves, and piping on 3000 -psi minimum, portland- cement -mix concrete piers. A. Install pressure regulators when line pressure exceeds required head pressure by 40 psi or more, with shutoff valve and strainer on inlet and pressure gage on outlet. A. Sprinklers: Flush circuit piping with full head of water and install sprinklers after hydrostatic test is completed. 1 Install lawn sprinklers at manufacturer's recommended heights. 2. Install shrubbery sprinklers at heights indicated on shop drawings. 3 Locate part- circle sprinklers to maintain a minimum distance of 4 inches (100 nun) from walls and 2 inches (50 nun) from other boundaries, unless otherwise indicated. A. Install controllers according to manufacturer's written instructions and as required. Install adjacent to existing controllers. B. Install control wiring in same trench with piping. 3.15 CONNECTIONS A. Connect piping to sprinklers, devices, valves, control valves, specialties, and accessories. B Electrical Connections: Connect to power source, controllers, and automatic control valves. C. Minimum requirements for electrical installations are specified in Division 16 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Ground systems according to Division 16 Section 'Grounding." 3.16 FIELD QUALITY CONTROL 3.17 CLEANING AND ADJUSTING SECTION 02810 PAGE 11 IRRIGATION SYSTEMS A. Testing: Perform hydrostatic test of piping and valves before backfilling trenches. Piping may be tested in sections to expedite work. 1 Cap and subject the pressure piping system to a static water pressure of 50 psig (345 kPa) above the operating pressure without exceeding pressure rating of piping system materials. Isolate test source and allow to stand for 4 hours. Leaks and loss in test pressure constitute defects that must be repaired. 2. Cap and subject the pressure circuit piping to static service line pressure with all lateral risers capped. Check for cracked pipes and leaking or unglued fittings. Minor drops on swing joint riser allowed. 3 Repair leaks and defects with new materials and retest system or portion thereof until satisfactory results are obtained. A. Flush dirt and debris from piping before installing sprinklers and other devices. B. Adjust automatic control valves to provide flow rate of rated operating pressure required for each sprinkler circuit. C Carefully adjust lawn sprinlders so they will be flush with, or not more than 1/2 inch (13 mm) above, finish grade after completion of landscape work. D Adjust settings of controllers and automatic control valves. 3.18 COMMISSIONING A. Starting Procedures: Follow manufacturer's written procedures. If no procedures are prescribed by manufacturers, proceed as follows: 1 Verify that specialty valves and their accessories have been installed correctly and operate correctly 2. Verify that specified tests of piping are complete. 3 Check that sprinlders and devices are correct type. 4 Check that damaged sprinklers and devices have been replaced with new materials. 5 Check that potable water supplies have correct type backflow preventers. 6 Energize circuits to electrical equipment and devices. 7 Adjust operating controls. B. Operational Testing: Perform operational testing after hydrostatic testing is completed, backfill is in place, and sprinklers are adjusted to final position. 3.19 DEMONSTRATION A. Demonstrate to Architect that system meets coverage requirements and that automatic controls function properly B. Demonstrate to Owner's maintenance personnel operation of equipment, sprinklers, specialties, and accessories. Review operating and maintenance information. MAHLUM NORDFORS McK NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Provide 7 days' written notice in advance of demonstration. D Submit receipts for delivery of extra materials to Owner 0 1997 Mahlrun Nordfors McKinley Gordon SECTION 02810 PAGE 12 IRRIGATION SYSTEMS END OF SECTION 02810 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPTTAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Lawns. 2. Topsoil and soil amendments. 3 Fertilizers and mulches. 1.3 SUBMITTALS SECTION 02900 PAGE 1 LANDSCAPING B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 2 Section "Earthwork" for excavation, filling, rough grading, and subsurface aggregate drainage and drainage backfill. A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Certification of grass seed from seed vendor for each grass -seed mixture stating the botanical and common name and percentage by weight of each species and variety and percentage of purity germination, and weed seed. Include the year of production and date of packaging. 1 Certification of each seed mixture for sod, identifying sod source, including name and telephone number of supplier C. Planting schedule indicating anticipated dates and locations for each type of planting. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed landscaping work similar in material, design, and extent to that indicated for this Project and with a record of successful landscape establishment. B Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings." 1.5 DELIVERY STORAGE, AND HANDLING A. Packaged Materials: Deliver packaged materials in containers showing weight, analysis, and name of manufacturer Protect materials from deterioration during delivery and while stored at site. B Sod. Harvest, deliver store, and handle sod according to the requirements of the American Sod Producers Association's (ASPA) "Specifications for Turfgrass Sod Materials and Transplanting/Installing." MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADD1 TIONS ALTERATIONS 1.6 PROJECT CONDITIONS A. Utilities: Determine location of above grade and underground utilities and perform work in a manner which will avoid damage. Hand excavate, as required. Maintain grade stakes until removal is mutually agreed upon by parties concerned. B. Excdvation. When conditions detrimental to plant growth are encountered, such as rubble fill, improper grading, adverse drainage conditions, or obstructions, notify Architect before planting. 1.7 COORDINATION AND SCHEDULING A. Coordinate installation of planting materials during normal planting seasons for each type of plant material required. 1.8 WARRANTY A. General Warranty' The special warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents. SECTION 02900 PAGE 2 LANDSCAPING B Special Warranty Warrant the following living planting materials for a period of one year after date of Substantial Completion, against defects including death and unsatisfactory growth, except for defects resulting from lack of adequate maintenance, neglect, or abuse by Owner abnormal weather conditions unusual for warranty period, or incidents that are beyond Contractor's control. 1 Lawn C. Remove and replace dead or damaged sod immediately unless required to plant in the succeeding planting season. D Replace sod in any areas (6) six square inches or larger that are dead or in an unhealthy condition at end of warranty period. 1.9 LAWN MAINTENANCE A. Begin maintenance of lawns immediately after each area is planted and continue until acceptable lawn is established, but for not less than the following periods: 2. Sodded Lawns: 30 days after date of Substantial Completion. B. Maintain and establish lawns by watering, fertilizing, weeding, mowing, trinuning, replanting, and other operations. Roll, regrade, correct any soil preparation deficiencies, and replant bare or eroded areas to produce a uniformly smooth lawn. C. Watering: Provide and maintain temporary piping, hoses, and lawn- watering equipment to convey water from sources and to keep lawns uniformly moist to a depth of 4 inches (100 min). 1 Water lawn at the minimum rate of 1 inch (25 mm) per week. D Mow lawns as soon as there is enough top growth to cut with mower set at specified height for principal species planted. Repeat mowing as required to maintain specified height without cutting more than 40 percent of the grass height. Remove no more than 40 percent of grass leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when grass is wet. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 02900 PAGE 3 LANDSCAPING E. Postfertilization. Apply fertilizer to lawn after first mowing and when grass is dry 1 Use fertilizer that will provide actual nitrogen of at least 1 lb per 1000 sq. ft. (0.5 kg per 100 sq. m) of lawn area. PART 2 PRODUCTS 2.1 GRASS MATERIALS A. Sod. Certified turfgrass sod complying with ASPA specifications for machine -cut thickness, size, strength, moisture content, and mowed height, and free of weeds and undesirable native grasses. Provide viable sod of uniform density color and texture of the following turfgrass species, strongly rooted, and capable of vigorous growth and development when planted. 1 Species: Provide sod of grass species and varieties, proportions by weight, and minimum percentages of purity germination, and maximum percentage of weed seed as indicated on Schedules at the end of this Section. 2.2 TOPSOIL A. Topsoil. ASTM D 5268, pH range of 5.5 to 7 5 percent by weight organic material minimum, free of stones 1 inch (25 mm) or larger in any dimension, and other extraneous materials harmful to plant growth. B Topsoil Source: Import clean, weed free, screened Planting Soil meeting the specification outlined below Submit 1 /4th foot sample with an accompanying fertility and mechanical analysis to the Architect for approval prior to delivery of product to site: 1 Planting Soil Mixture (by volume measurement) a. 40% Loamy Fine Sand b 40 Sandy Loam c. 20% Lawn and Garden Compost 2.3 SOIL AMENDMENTS A. Lime: ASTM C 602, Class T agricultural limestone containing a minimum 80 percent calcium carbonate equivalent, with a minimum 99 percent passing a No. 8 (2.36 mm) sieve and a minimum 75 percent passing a No. 60 (250 micrometer) sieve. 1 Provide lime in the form of dolomitic limestone. B. Aluminum Sulfate: Commercial grade, unadulterated. C. Sand. Clean, washed, natural or manufactured sand, free of toxic materials. D Perlite: Horticultural perlite, soil amendment grade. E. Compost: Finely divided or granular texture, with a pH range of 6 to 7.5 composed of partially decomposed waste or sawdust/manure (Sawdust Supply Steerco, or equivalent.) F Manure: Well- rotted, unleached stable or cattle manure containing not more than 25 percent by volume of straw sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth. G. Herbicides: EPA registered and approved, of type recommended by manufacturer H. Water Potable. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.4 FERTILIZER A. Commercial Fertilizer Commercial -grade complete fertilizer of neutral character, consisting of fast- and slow release nitrogen, 50 percent derived from natural organic sources of urea form, phosphorous, and potassium in the following composition. 1 Composition. 1 lb per 1000 sq. ft. (0.5 kg per 100 sq. m) of actual nitrogen, 10 -20 -20 PART 3 EXECUTION 3.1 EXAMINATION SECTION 02900 PAGE 4 LANDSCAPING A. Examine areas to receive landscaping for compliance with requirements and for conditions affecting performance of work of this Section. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 PLANTING SOIL PREPARATION A. Before mixing, clean topsoil of roots, plants, sods, stones, clay lumps, and other extraneous materials harmful to plant growth. B. Mix soil amendments and fertilizers with topsoil at rates indicated. Delay mixing fertilizer if planting does not follow placing of planting soil within a few days. C For lawns, mix planting soil either prior to planting or apply on surface of topsoil and mix thoroughly before planting. 3.3 LAWN PLANTING PREPARATION A. Limit subgrade preparation to areas that will be planted in the immediate future. B Loosen subgrade to a minimum depth of 6 inches. Remove stones larger than 1 1/2 inches (38 mm) in any dimension and sticks, roots, rubbish, and other extraneous materials. C. All lawn areas to receive nine (9) inches minimum compacted depth (measured after light rolling and natural settlement) of Planting Soil as required to meet finish grade contours spot elevations shown on Civil Grading Plan and/or minimum depths indicated on planting Plan Sections and/or Details. Do not spread Planting Soil when sub -grade or Planting Soil is frozen or muddy 1 Place approximately 1/2 the thickness of Planting Soil required. Work into the top half of loosened sub -grade to create a transition layer and then place remainder of Planting Soil mixture to provide specified finish grade. D Preparation of Unchanged Grades: Where lawns are to be planted in areas unaltered or undisturbed by excavating, grading, or surface soil stripping operations, prepare soil as follows: 1 Remove and dispose of existing grass, vegetation, and turf. Do not turn over into soil being prepared for lawns. 2. Loosen surface soil to a depth of at least 12 inches. Apply required soil amendments and initial fertilizers and mix thoroughly into top 4 inches (100 mm) of soil. Prior to conducting this work locate and protect existing tree roots and utilities within lawn areas. 3 Clean surface soil of roots, plants, sods, stones, clay lumps, and other extraneous materials harmful to plant growth. 1 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 t 1 r 1 f 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 02900 PAGE 5 LANDSCAPING 4 Remove waste material, including grass, vegetation, and turf, and legally dispose of it off the Owner's property E. Grade lawn and grass areas to a smooth, even surface with loose, uniformly fine texture. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit fine grading to areas that can be planted in the immediate future. Remove trash, debris, stones larger than 1 -1/2 inches (38 nun) in any dimension, and other objects that may interfere with planting or maintenance operations. F Moisten prepared lawn areas before planting when soil is dry Water thoroughly and allow surface to dry before planting. Do not create muddy soil. G. Place sod in rows with staggered joints. Fine rake ahead of installation to provide loosened soil texture for thorough bond. Tuck edges of sod together to prevent shrinkage gaps. Cut edges against hard surfaces and planting areas to provide clean flowing edge lines. Immediately apply water and roll to insure thorough contact between planting soil and sod soil. Keep sod and planting soil moist until rooting contact is established. Fill and re-roll any areas indicated settlement. Stake or staple sod on any sloped areas inclined to slide. 3.4 SODDING NEW LAWNS A. Lay sod within 24 hours of stripping. Do not lay sod if dormant or if ground is frozen. B. Lay sod to form a solid mass with tightly fitted joints. Butt ends and sides of sod; do not stretch or overlap. Stagger sod strips or pads to offset joints in adjacent courses. Avoid damage to subgrade or sod during installation. Tamp and roll lightly to ensure contact with subgrade, eliminate air pockets, and form a smooth surface. Work sifted soil or fine sand into minor cracks between pieces of sod; remove excess to avoid smothering sod and adjacent grass. 1 Lay sod across angle of slopes exceeding 1.3 2. Anchor sod on slopes exceeding 1 with wood pegs spaced as recommended by sod manufacturer but not less than 2 anchors per sod strip to prevent slippage. C. Saturate sod with fine water spray within 2 hours of planting. During first week, water daily or more frequently as necessary to maintain moist soil to a minimum depth of 1 -1/2 inches (38 min) below the sod. 3.5 RECONDITIONING LAWNS A. Recondition existing lawn areas damaged by Contractor's operations, including storage of materials or equipment and movement of vehicles. Also recondition lawn areas where settlement or washouts occur or where minor regrading is required. 1 Recondition other existing lawn areas. B. Remove sod and vegetation from diseased or unsatisfactory lawn areas; do not bury into soil. Remove topsoil containing foreign materials resulting from Contractor's operations, including oil drippings, fuel spills, stone, gravel, and other construction materials, and replace with new topsoil. C. Where substantial lawn remains, mow dethatch, core aerate, and rake. Remove weeds before seeding. Where weeds are extensive, apply selective herbicides as required. Do not use pre emergence herbicides. D Remove waste and foreign materials, including weeds, soil cores, grass, vegetation, and turf, and legally dispose of it off the Owner's property MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS E. Till stripped, bare, and compacted areas thoroughly to a depth of 6 inches (150 mm). F Apply required soil amendments and initial fertilizers and mix thoroughly into top 4 inches (100 mm) of soil. Provide new planting soil as required to fill low spots and meet new finish grades. H. Apply sod as required for new lawns. I. Water newly planted areas and keep moist until new grass is established. 3.6 CLEANUP AND PROTECTION A. During landscaping, keep pavements clean and work area in an orderly condition. B. Protect landscaping from damage due to landscape operations, operations by other contractors and trades, and trespassers. Maintain protection during installation and maintenance periods. Treat, repair or replace damaged landscape work as directed. 3.7 DISPOSAL OF SURPLUS AND WASTE MATERIALS A. Disposal. Remove surplus soil and waste material, including excess subsoil, unsuitable soil, trash, and debris, and legally dispose of it off the Owner's property 3.8 PLANTING SOIL AMENDMENTS SCHEDULE A. Lawns: Provide soil amendments in not less than the following quantities: 1 Ratio of loose compost to topsoil by volume: 30% 2. Weight of lime per 1000 sq. ft. 50 lbs. 3 Weight of commercial 10 -20 -20 fertilizer per 1000 sq. ft. 10 lbs. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 02900 PAGE 6 LANDSCAPING END OF SECTION 02900 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section specifies cast -in place concrete, including formwork, reinforcing, mix design, placement procedures, and finishes. B Cast -in -place concrete includes the following: 1. Foundations and footings 2. Walls 3 Infill windows 4 Reveals C. Related Sections: The following Sections contain requirements that relate to this Section. 1 Section 02520, `Portland Cement Concrete Paving' for concrete paving and walks. 2. Section 03450 Architectural Precast Concrete' for plant cast panels. 3 Section 03650 `Cementitious Underlayment' for building slopes to drain. 4 Section 07100 `Water Repellents' for concrete sealing. 1.3 SUBMITTALS 1 Normal weight aggregates. E. Laboratory test reports for concrete materials and mix design test. 1.4 QUALITY ASSURANCE SECTION 03300 PAGE 1 CAST -IN-PLACE CONCRETE A. General. Submit the following according to Conditions of the Contract and Division 1 Specification Sections. B. Product data for proprietary materials and items, including reinforcement accessories, admixtures, patching compounds, joint systems, curing compounds, and others if requested by Architect. C. Shop drawings for reinforcement detailing fabricating, bending, and placing concrete reinforcement. Comply with ACI 315 "Manual of Standard Practice for Detailing Reinforced Concrete Structures" showing bar schedules, stirrup spacing, bent bar diagrams, and arrangement of concrete reinforcement. Include special reinforcing required for openings through concrete structures. D Samples of materials as requested by Architect, including names, sources, and descriptions, as follows: A. Codes and Standards: Comply with provisions of the following codes, specifications, and standards, except where more stringent requirements are shown or specified: 1 American Concrete Institute (ACI) 301, 'Specifications for Structural Concrete for Buildings." MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 03300 PAGE 2 CAST -IN-PLACE CONCRETE 2. ACI 318, "Building Code Requirements for Reinforced Concrete." 3 ACI Field Reference Manual SP 15 4 Concrete Reinforcing Steel Institute (CRSI) publications "Manual of Standard Practice' and "Placing Reinforcing Bars. B. Materials and installed work may require testing and retesting at any time during progress of Work. Tests, including retesting of rejected materials for installed Work, shall be done at Contractor's expense. PART2 PRODUCTS 2.1 FORM MATERIALS A. Forms for Exposed Finish Concrete: Plywood, metal, metal- framed plywood faced, or other acceptable panel -type materials to provide continuous, straight, smooth, exposed surfaces. Furnish in largest practicable sizes to minimize number of joints and to conform to joint system shown on drawings. 1 User overlaid plywood complying with U.S Product Standard PS -1 "A -C or B -B High Density Overlaid Concrete Form," Class I. B Forms for Unexposed Finish Concrete: Plywood, lumber metal, or another acceptable material. Provide lumber dressed on at least two edges and one side for tight fit. C Form Release Agent: Provide commercial formulation form release agent with a maximum of 350 mg/1 volatile organic compounds (VOCs) that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces. D Form Ties: Factory- fabricated, adjustable length, removable or snap -off metal form ties designed to prevent form deflection and to prevent spalling of concrete upon removal. Provide units that will leave no metal closer than 1 1/2 inches to the plane of the exposed concrete surface. 1 Provide ties that, when removed, will leave holes not larger than 1 inch in diameter in the concrete surface. E. Reveals: Smooth wood or prefabricated plastic strips in the shapes as indicated. Provide corner shapes where reveals turn corner 2.2 REINFORCING MATERIALS A. Reinforcing Bars: ASTM A 615 Grade 60 deformed. B Steel Wire: ASTM A 82, plain, cold -drawn steel. C. Supports for Reinforcement: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire fabric in place. Use wire bar -type supports complying with CRSI specifications. 1 For slabs -on- grade, use supports with sand plates or horizontal runners where base material will not support chair legs. 2. For exposed to view concrete surfaces where legs of supports are in contact with forms, provide supports with legs that are protected by plastic (CRSI, Class 1) or stainless steel (CRSI, Class 2). MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 03300 PAGE 3 CAST -IN -PLACE CONCRETE 2.3 CONCRETE MATERIALS A. Portland Cement: ASTM C 150, Type I. 1 Use one brand of cement throughout Project unless otherwise acceptable to Architect. B. fly Ash. ASTM C 618, Type F C. Normal- Weight Aggregates: ASTM C 33 and as specified. Provide aggregates from a single source for exposed concrete. 1 For exposed exterior surfaces, do not use fine or coarse aggregates that contain substances that cause spalling. 2. Local aggregates not complying with ASTM C 33 that have been shown to produce concrete of adequate strength and durability by special tests or actual service may be used when acceptable to Architect. D Water Potable. E. Admixtures, General. Provide concrete admixtures, if any that contain not more than 0 1 percent chloride ions. F Air- Entraining Admixture: ASTM C 260 certified by manufacturer to be compatible with other required admixtures. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: a. Air -Tite, Cormix Construction Chemicals. b. Air -mix or Perma -Air Euclid Chemical Co. c. Darex AEA or Daravair W.R. Grace Co. d. MB -VR or Micro -Air Master Builders, Inc. e. Sealtight AEA< W.R. Meadows, Inc. f. Sika AER, Sika Corp. G. Water Reducing Admixture: ASTM C 494 Type A. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: a. Chemtard, ChemMasters Corp. b. PSI N, Cormix Construction Chemicals. c. Eucon WR -74 Euclid Chemical Co. d. WRDA, W.R. Grace Co. e. Pozzolith Normal or Polyheed, Master Builders, Inc. f. Metco W.R. Metalcrete Industries. g. Prokrete -N, Prokrete Industries. h. Plastocrete 161, Sika Corp. H. High -Range Water- Reducing Admixture: ASTM C 494 Type F or Type G. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: \MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS a. b. c. d. e. f. g. h. I. Water Reducing Accelerating Admixture: ASTM C 494 Type E. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: a. b. c. d. e. f. 2.4 RELATED MATERIALS Super P' Anti -Hydro Co. Inc. Cormix 200 Cormix Construction Chemicals. Eucon 37 Euclid Chemical Co. WRDA 19 or Daracem, W.R. Grace Co. Rheobuild or Polyheed, Master Builders, Inc. Superslump, Metalcrete Industries. PSPL, Prokerete Industries. Sikament 300 Sika Corp. Q -Set, Conspec Marketing Manufacturing Co. Lubricon NCA, Cormix Construction Chemicals. Accellguard 80 Euclid Chemical Co. Daraset, W.R. Grace Co. Pozzutec 20 Master Builders, Inc. Accell -Set, Metaicrete Industries. C Moisture Retaining Cover One of the following, complying with ASTM C 171 1 Waterproof paper 2. Polyethylene film. SECTION 03300 PAGE 4 CAST -IN-PLACE CONCRETE J Water- Reducing, Retarding Admixture: ASTM C 494 Type D 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: a/ PSI -R Plus, Cormix Construction Chemicals. b. Eucon Retarder 75 Euclid Chemical Co. c. Daratard -17 W.R. Grace Co. d. Pozzolith R, Master Builders, Inc. e. Portard, Prokerete Industries. f. Plastiment, Sika Corporation. A. Vapor Barrier Premolded seven -ply membrane consisting of reinforced core and with fortified bitumen layers, protective weathercoating, and plastic antistick vapor transmission rate of 0 00 grains per sq. ft. per hr when tested according to Method B. Provide manufacturer's recommended mastics and gusset tape. 1 Product: Subject to compliance with requirements, provide Sealtight Membrane by W.R. Meadows, Inc. B Absorptive Cover Burlap cloth made from jute or kenaf, weighing approximately yd. complying with AASHTO M 182, Class 2. carrier sheet sheet. Water ASTM E 96, Premoulded 9 oz. per sq. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 r MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL r 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3 Polyethylene- coated burlap. SECTION 03300 PAGE 5 CAST -IN-PLACE CONCRETE D Evaporation Control. Monomolecular film- forming compound applied to exposed concrete slab surfaces for temporary protection from rapid moisture loss. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: a. Aquafilm, Conspec Marketing and Mfg. Co. b. Eucobar Euclid Chemical Co. c. E -Con, L&M Construction Chemicals, Inc. d. Confilm, Master Builders, Inc. e. Waterhold, Metalcrete Industries. E. Underlayment Compound. Free flowing, self leveling, pumpable, cement -based compound for applications from 1 inch thick to feathered edges. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: a. K -15 Ardex, Inc. b. Self Leveling Wear Topping, W.R. Bonsal Co. c. Conflow Conspec Marketing and Mfg. Co. d. Corlevel, Cormix Construction Chemicals. e. LevelLayer II, Dayton Superior Corp. f. Flo -Top, Euclid Chemical Co. g. Gyp- Crete, Gyp -Crete Corp. h. Levelex, L &M Construction Chemicals, Inc. i. Underlayment 100 Master Builders, Inc. j. Stoncrete UL1, Stonhard, Inc. k. Concrete Top, Symons Corp. 1. Thoro Underlayment Self Leveling, Thoro System Products. F Bonding Agent: Polyvinyl acetate or acrylic base. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited, to, the following: a. Polyvinyl Acetate (Interior Only) (1) Superior Concrete Bonder Dayton Superior Corp. (2) Euco Weld, Euclid Chemical Co. (3) Weld- Crete, Larsen Products Corp. (4) Everweld, L&M Construction Chemicals, Inc. (5) Herculox, Metalcrete Industries. (6) Ready Bond, Symons Corp. b. Acrylic or Styrene Butadine: (1) Acrylic Bondcrete, The Burke Co. MAHLUM NORDFORS McILNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS (2) Strongbond, Conspec Marketing and Mfg. Co. (3) Day -Chem Ad Bond, Dayton Superior Corp. (4) SBR Latex, Euclid Chemical Co. (5) Daraweld C. W.R. Grace Co. (6) Hornweld, A.C. Horn, Inc. (7) Everbond, L &M Construction Chemicals, Inc. (8) Acryl -Set, Master Builders, Inc. (9) Intralok, W.R. Meadows, Inc. (10) Acrylpave, Metalcrete Industries. (11) Sonocrete, Sonneborn- Chemrex. (12) Stonlock LB2, Stonhard, Inc. (13) Strong Bond, Symons Corp. SECTION 03300 PAGE 6 CAST -IN-PLACE CONCRETE G. Epoxy Adhesive: ASTM C 881, two component material suitable for use on dry or damp surfaces. Provide material type, grade, and class to suit Project requirements. 1 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: a. Burke Epoxy M.V The Burke Co. b. Spec -Bond 100 Conspec Marketing and Mfg. Co. c. Resi -Bond (J -58), Dayton Superior d. Euco Epoxy System #452 or #620 Euclid Chemical Co. e. Poxtite Binder 2390 A.C. Horn, Inc. f. Epabond, L &M Construction Chemicals, Inc. g. Concresive Standard Liquid, Master Builders, Inc. h. Rezi -Weld 1000 W.R. Meadows, Inc. i. Metco Hi -Mod Epoxy Metalcrete Industries. j. Sikadur 32 Hi -Mod, Sika Corp. k. Stonset LV5 Stonhard, Inc. 1. R-600 Series, Symons Corp. 2.5 PROPORTIONING AND DESIGNING MIXES A. Prepare design mixes for each type and strength of concrete by either laboratory trial batch or field experience methods as specified in ACI 301 For the trial batch method, use an independent testing agency acceptable to Architect for preparing and reporting proposed mix designs. 1 Do not use the same testing agency for field quality control testing. B Submit written reports to Architect of each proposed mix for each class of concrete at last 15 days prior to start of Work. Do not begin concrete production until proposed mix designs have been reviewed by Architect. C. Design mixes to provide normal weight concrete with the following properties as indicated on drawings and schedules: 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1 Concrete: Not more than 4 inches. 2.6 ADMIXTURES 2.7 CONCRETE MIXING PART 3- EXECUTION 3.1 GENERAL 3.2 FORMS SECTION 03300 PAGE 7 CAST -IN-PLACE CONCRETE 1 3000 -psi, 28-day compressive strength, water cement ratio, 0.58 maximum (non -air- entrained), 0 46 maximum (air entrained). 2. 4000 -psi, 28-day compressive strength; water cement ratio, 0.50 maximum. D Slump Limits: Proportion and design mixes to result in concrete slump at point of placement as follows: E. Adjustment to Concrete Mixes: Mix design adjustments may be requested by Contractor when characteristics of materials, job conditions, weather, test results, or other circumstances warrant, as accepted by Architect. Laboratory test data for revised mix design and strength results must be submitted to and accepted by Architect before using in Work. A. Use water- reducing admixture or high -range water- reducing admixture (superplasticizer) in concrete, as required, for placement and workability B. Use accelerating admixture in concrete slabs placed at ambient temperatures below 50 deg F (10 deg C). C. Use air- entraining admixture in exterior exposed concrete unless otherwise indicated. Add air entraining admixture at manufacturer's prescribed rate to result in concrete at point of placement having total air content to produce 4 to 6 percent entrained air D Use admixtures for water reduction and set accelerating or retarding in strict compliance with manufacturer's directions. A. Ready -Mixed Concrete: Comply with requirements of ASTM C 94 and as specified. 1 When air temperature is between 85 deg F (30 deg C) and 90 deg F (32 deg C), reduce mixing and delivery time from 1 -1/2 hours to 75 minutes, and when air temperature is above 90 deg F (32 deg C), reduce mixing and delivery time to 60 minutes. A. Coordinate the installation of joint materials, vapor retarder/barrier and other related materials with placement of reinforcing steel. A. General. Design, erect, support, brace, and maintain formwork to support vertical, lateral, static and dynamic loads that might be applied until concrete structure can support such loads. Construct formwork so concrete members and structures are of correct size, shape, alignment, elevation, and position. Maintain formwork construction tolerances and surface irregularities complying with the following ACI 347 limits: 1 Provide Class A tolerances for concrete surfaces exposed to view 2. Provide Class C tolerances for other concrete surfaces. B Construct forms to sizes, shapes, lines, and dimensions shown and to obtain accurate alignment, location, grades, level, and plumb work in finished structures. Provide for openings, MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush plates or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces where slope is too steep to place concrete with bottom forms only Kerf wood inserts for forming keyways, reglets, recesses, and the like for easy removal. D Provide temporary openings for clean-outs and inspections where interior area of formwork is inaccessible before and during concrete placement. Securely brace temporary openings and set tightly to forms to prevent losing concrete mortar Locate temporary openings in forms at inconspicuous locations. E. Chamfer exposed corners and edges as indicated, using wood, metal, PVC, or rubber chamfer strips fabricated to produce uniform smooth lines and tight edge joints. F Provisions for Other Trades: Provide openings in concrete formwork to accommodate work of other trades. Determine size and location of openings, recesses, and chases from trades providing such items. Accurately place and securely support items built into forms. G. Cleaning and Tightening: Thoroughly clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, or other debris just before placing concrete. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment. 3.3 REVEALS 3.4 PLACING REINFORCEMENT SECTION 03300 PAGE 8 CAST -IN-PLACE CONCRETE offsets, sinkages, keyways, recesses, moldings, rustication, reglets, chamfers, blocking, screeds, bulkheads, anchorages and inserts, and other features required in the Work. Use selected materials to obtain required finishes. Solidly butt joints and provide backup at joints to prevent cement paste from leaking. A. Install strips to form concrete configurations indicated. Provide smooth transition and alignment at joints and corners. Set and fill nail holes and seal strips to surface. A. General Comply with Concrete Reinforcing Steel Institute's recommended practice for "Placing Reinforcing Bars," for details and methods of reinforcement placement and supports and as specified. 1 Avoiding cutting or puncturing vapor retarder during reinforcement placement and concreting operations. Repair damages before placing concrete. B. Clean reinforcement of loose rust and mill scale, earth, ice, and other materials that reduce or destroy bond with concrete. C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcing by metal chairs, runners, bolsters, spacers, and hangers, as approved by Architect. D Place reinforcement to maintain minimum coverages as indicated for concrete protection. Arrange, space, and securely tie bars and bar supports to hold reinforcement in position during concrete placement operations. Set wire ties so ends are directed into concrete, not toward exposed concrete surfaces. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.5 JOINTS SECTION 03300 PAGE 9 CAST -IN-PLACE CONCRETE A. Construction Joints: Locate and install construction joints so they do not impair strength or appearance of the structure, as acceptable to Architect. B. Provide keyways at least 1 -1/2 inches deep in construction joints in walls and slabs and lft~tween walls and footings. Bulkheads designed and accepted for this purpose may be used for slabs. C. Place construction joints perpendicular to main reinforcement. Continue reinforcement across construction joints except as indicated otherwise. Do not continue reinforcement through sides of strip placements. D Use bonding agent on existing concrete surfaces that will be joined with fresh concrete. E. Isolation Joints in Slabs -on- Grade: Construct isolation joints in slabs -on -grade at points of contact between slabs -on -grade and vertical surfaces, such as column pedestals, foundation walls, grade beams, and other locations as indicated. 1 Joint fillers and sealants are specified in Division 7 Section "Joint Sealants. F Contraction (Control) Joints in Slabs -on- Grade: Construct contraction joints in slabs -on -grade to form panels of patterns as shown. Use saw cuts 1/8 inch wide by one -third of slab depth or inserts 1/4 inch wide by one -third of slab depth, unless otherwise indicated. G Form contraction joints by inserting premolded plastic, hardboard, or fiberboard strip into fresh concrete until top surface of strip is flush with slab surface. Tool slab edges round on each side of insert. After concrete has cured, remove inserts and clean groove of loose debris. H. Contraction joints in unexposed floor slabs may be formed by saw cuts as soon as possible after slab finishing as may be safely done without dislodging aggregate. I. Joint fillers and sealants are specified in Division 7 Section "Joint Sealants." 3.6 INSTALLING EMBEDDED ITEMS A. General. Set and build into formwork anchorage devices and other embedded items required for other work that is attached to or supported by cast -in -place concrete. use setting drawings, diagrams, instructions, and directions provided by suppliers of items to be attached. B Install reglets to receive top edge of foundation sheet waterproofing and to receive through wall flashings in outer face of concrete frame at exterior walls, where flashing is shown at lintels, relieving angles, and other conditions. C. Install dovetail anchor slots in concrete structures as indicated on drawings. D Forms for Slabs: Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and contours in finished surfaces. Provide and secure units to support screed strips using strike -off templates or compacting -type screeds. 3.7 PREPARING FORM SURFACES A. General. Coat contact surfaces of forms with an approved, nonresidual, low -VOC, form coating compound before placing reinforcement. MAIILUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 03300 PAGE 10 CAST -IN -PLACE CONCRETE B. Do not allow excess form coating material to accumulate in forms or come into contact with in -place concrete surfaces against which fresh concrete will be placed. Apply according to manufacturer's instructions. 3.8 CONCRETE PLACEMENT A. Inspection: Before placing concrete, inspect and complete reinforcing steel. Notify other trades to permit installation of their work. B General. Comply with ACI 304 "Guide for Measuring, Mixing, Transporting, and Placing Concrete," and as specified. C. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on concrete that has hardened sufficiently to cause seams or planes of weakness. Deposit concrete to avoid segregation at its final location. D Placing Concrete in Forms: Deposit concrete in forms in horizontal layers no deeper than 24 inches and in a manner to avoid inclined construction joints. Where placement consists of several layers, place each Layer while preceding layer is still plastic to avoid cold joints. 1 Consolidate placed concrete by mechanical vibrating equipment supplemented by hand spading, rodding, or tamping. Use equipment and procedures for consolidation of concrete complying with ACI 309 2. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations no farther than the visible effectiveness of the machine. Please vibrators to rapidly penetrate placed layer and at least 6 inches into preceding layer Do not insert vibrators into lower layers of concrete that have begun to set. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mix to segregate. E. Placing Concrete Slabs: Deposit and consolidate concrete slabs in a continuous operation. 1 Consolidate concrete during placement operations so that concrete is thoroughly worked around reinforcement and into corners. 2. Bring slab surfaces to correct level with a straightedge and strike off. Use bull floats or darbies to smooth surface free of humps or hollows. Do not disturb slab surfaces prior to beginning finishing operations. 3 Maintain reinforcing in proper position on chairs during concrete placement. F Cold- Weather Placement: Comply with provisions of ACI 306 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures. G. When air temperature has fallen to or is expected to fall below 40 deg F (4 deg C), uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 50 deg F (10 deg C) and not more than 80 deg F (27 deg C) at point of placement. 1 Do not use frozen materials or materials containing ice or snow Do not place concrete on frozen subgrade or on subgrade containing frozen materials. 2. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise accepted in mix designs. H. Hot Weather Placement: When hot weather conditions exist that would impair quality and strength of concrete, place concrete complying with ACI 305 and as specified. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 03300 PAGE 11 CAST -IN -PLACE CONCRETE 1 Cool ingredients before mixing to maintain concrete temperature at time of placement to below 90 deg F (32 deg C). Mixing water may be chilled or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water Using liquid nitrogen to cool concrete is Contractor's option. 2. Cover reinforcing steel with water soaked burlap if it becomes too hot, so that steel temperature will not exceed the ambient air temperature immediately before embedding in concrete. 3 Fog spray forms, reinforcing steel, and subgrade just before placing concrete. Keep subgrade moisture uniform without puddles or dry areas. 4 Use water reducing retarding admixture when required by high temperatures, low humidity or other adverse placing conditions, as acceptable to Architect. 3.9 FINISHING FORMED SURFACES A. Rough Formed Finish. Provide a rough formed finish on formed concrete surfaces not exposed to view in the finished Work or concealed by other construction. This is the concrete surface having texture imparted by form facing material used, with tie holes and defective areas repaired and patched, and fins and other projections exceeding 1/4 inch in height rubbed down or chipped off. B Smooth- Formed Finish. provide a smooth- formed finish covered with a coating material applied directly to concrete, or a covering material applied directly o concrete, such as waterproofing, dampproofing, veneer plaster painting, or another similar system. This is an as -cast concrete surface obtained with selected rm- facing material, arranged in an orderly and symmetrical manner with a minimum of seams. Repair and patch defective areas with fins and other projections completely removed and smoothed. C. Textured Finish. Provide medium sandblast on concrete where textured finish is indicated on drawings. Sandblast is to be applied to smooth formed finish walls. D Grout Cleaned Finish. Provide grout cleaned finish on scheduled concrete surfaces that have received smooth- formed finish treatment. 1 Combine one part portland cement to one and one -half parts fine sand by volume, and a 50:50 mixture of acrylic or styrene butadiene -based bonding admixture and water to form the consistency of thick paint. Blend standard portland cement and white portland cement in amounts determined by trial patches so that final color of dry grout will match adjacent surfaces. 2. Thoroughly wet concrete surfaces, apply grout to coat surfaces, and fill small holes. Remove excess grout by scraping and rubbing with clean burlap. Keep damp by fog spray for at least 36 hours after rubbing. E. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike -off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces unless otherwise indicated. 3.10 MONOLITHIC SLAB FINISHES A. Scratch Finish. Apply scratch finish to monolithic slab surfaces to receive concrete floor topping or mortar setting beds for tile, portland cement terrazzo, and other bonded applied cementitious finish flooring material, and where indicated. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1 SECTION 03300 PAGE 12 CAST -IN-PLACE CONCRETE 1 After placing slabs, finish surface to tolerances of F(F) 15 (floor flatness) and F(L) 13 (floor levelness) measured according to ASTM E 11'55 Slope surfaces uniformly to drains where required. After leveling, roughen surface before final set with stiff brushes, brooms, or rakes. B Float Finish. Apply float finish to monolithic slab surfaces to receive trowel finish and other finishes as specified; slab surfaces to be covered with membrane or elastic waterproofing, membrane or elastic roofing, or sand -bed terrazzo; and where. indicated. 1 After screeding, consolidating, and leveling concrete slabs, do not work surface until ready for floating. Begin floating, using float blades or float shoes only when surface water has disappeared, or when concrete has stiffened sufficiently to permit operation of power- driven floats, or both. Consolidate surface with power- driven floats or by hand floating if area is small or inaccessible to power units. Finish surfaces to tolerances of F(F) 18 (floor flatness) and F(L) 15 (floor levelness) measured according to ASTM E 1155 Cut down high spots and fill low spots. Uniformly slope surfaces to drains. Immediately after leveling, refloat surface to a uniform, smooth, granular texture. C. Trowel Finish. Apply a trowel finish to monolithic slab surfaces exposed to view and slab surfaces to be covered with resilient flooring, carpet, ceramic or quarry tile, paint, or another thin film -finish coating system. After floating, begin first trowel -finish operation using a power- driven trowel. Begin final troweling when surface produces a ringing sound as trowel is moved over surface. Consolidate concrete surface by final hand- troweling operation, free of trowel marks, uniform in texture and appearance, and finish surfaces to tolerances of F(F) 20 (floor flatness) and F(L) 17 (floor levelness) measured according to ASTM E 1155 Grind smooth any surface defects that would telegraph through applied floor covering system. D Trowel and Fine Broom Finish. Where ceramic or quarry tile is to be installed with thin -set mortar apply a trowel finish as specified, then immediately follow by slightly scarifying the surface with a fine broom. E. Nonslip Broom Finish. Apply a nonslip broom finish to exterior concrete platforms, steps, and ramps, and elsewhere as indicated. 1 Immediately after float finishing, slightly roughen concrete surface by brooming with fiber bristle broom perpendicular to main traffic route. Coordinate required final finish with Architect before application. 3.11 MISCELLANEOUS CONCRETE ITEMS A. Filling In. Fill in holes and openings left in concrete structures for passage of work by other trades, unless otherwise shown or directed, after work of other trades is in place. Mix, place, and cure concrete as specified to blend with in -place construction. Provide other miscellaneous concrete filling shown or required to complete Work. B. Equipment Bases and Foundations: Provide machine and equipment bases and foundations as shown on drawings. Set anchor bolts for machines and equipment to template at correct elevations, complying with diagrams or templates of manufacturer furnishing machines and equipment. 3.12 CONCRETE CURING AND PROTECTION A. General. Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. In hot, dry and windy weather protect concrete from rapid moisture loss before and during finishing operations with an evaporation- control material. Apply according to MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAINISURGERY ADDITIONS ALTERATIONS 3.13 REMOVING FORMS SECTION 03300 PAGE 13 CAST -IN-PLACE CONCRETE manufacturer's instructions after screeding and bull floating, but before power floating and troweling. B. Start initial curing as soon as free water has disappeared from concrete surface after placing and finishing. Weather permitting, keep continuously moist for not less than 7 days. C. Curing Methods: Cure concrete by curing compound, by moist curing, by moisture- retaining cover curing, or by combining these methods, as specified. D Provide moisture curing by the following methods: 1 Keep concrete surface continuously wet by covering with water 2. Use continuous water -fog spray 3 Cover concrete surface with specified absorptive cover, thoroughly saturate cover with water and keep continuously wet. Place absorptive cover to provide coverage of concrete surfaces and edges, with a 4 -inch lap over adjacent absorptive covers. E. Provide moisture retaining cover curing as follows: 1 Cover concrete surfaces with moisture retaining cover for curing concrete, placed in widest practicable width with sides and ends lapped at least 3 inches and sealed by waterproof tape or adhesive. Inunediately repair any holes or tears during curing period using cover material and waterproof tape. F Apply curing compound on exposed interior slabs not scheduled for finished floor materials, and on exterior slabs, walks, and curbs as follows: 1 Apply curing compound to concrete slabs as soon as final finishing operations are complete (within 2 hours and after surface water sheen has disappeared) Apply uniformly in continuous operation by power spray or roller according to manufacturer's directions. Recoat areas subjected to heavy rainfall within 3 hours after initial application. Maintain continuity of coating and repair damage during curing penod. 2. Use membrane curing compounds that will not affect surfaces to be covered with finish materials applied directly to concrete. G Curing Unformed Surfaces: Cure unformed surfaces scheduled to receive finish flooring, including slabs, floor topping, and other flat surfaces, with a moisture retaining cover unless otherwise directed. Do not use curing compounds. 1 Final cure concrete surfaces to receive finish flooring with a moisture retaining cover unless otherwise directed. A. General. Formwork not supporting weight of concrete, such as walls, and similar parts of the work, may be removed after cumulatively curing at not less than 50 deg F (10 deg C) for 24 hours after placing concrete, provide concrete is sufficiently hard to not be damaged by form removal operations, and provided curing and protection operations are maintained. B Form- facing material may be removed 4 days after placement only if shores and other vertical supports have been arranged to permit removal of form- facing material without loosening or disturbing shores and supports. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.14 REUSING FORMS SECTION 03300 PAGE 14 CAST -IN-PLACE CONCRETE A. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form facing material will not be acceptable for exposed surfaces. Apply new form coating compound as specified for new formwork. B When+fonms are extended for successive concrete placement, thoroughly clean surfaces, remove fins and laitance, and tighten forms to close joints. Align and secure joint to avoid offsets. Do not use patched forms for exposed concrete surfaces except as acceptable to Architect. 3.15 CONCRETE SURFACE REPAIRS A. Patching Defective Areas: Repair and patch defective areas with cement mortar immediately after removing forms, when acceptable to Architect. B Mix dry-pack mortar, consisting of one part portland cement to 2 -1/2 parts fine aggregate passing a No. 16 mesh sieve, using only enough water as required for handling and placing. Cut out honeycombs, rock pockets, voids over 1/4 inch in any dimension, and holes left by tie rods and bolts down to solid concrete but in no case to a depth less than 1 inch. Make edges of cuts perpendicular to the concrete surface. Thoroughly clean, dampen with water and brush -coat the area to be patched with bonding agent. Place patching mortar before bonding agent has dried. 2. For surfaces exposed to view blend white portland cement and standard portland cement so that, when dry patching mortar will match surrounding color Provide test areas at inconspicuous locations to verify mixture and color match before proceeding with patching. Compact mortar in place and strike -off slightly higher than surrounding surface. 1 C Repairing Formed Surfaces: Remove and replace concrete having defective surfaces if defects cannot be repaired to satisfaction of Architect. Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycomb, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning. Flush out form tie holes and fill with dry-pack mortar or precast cement cone plugs secured in place with bonding agent. Repair concealed formed surfaces, where possible, containing defects that affect the concrete's durability If defects cannot be repaired, remove and replace the concrete. D Repairing Unformed Surfaces: Test unformed surfaces, such as monolithic slabs, for smoothness and verify surface tolerances specified for each surface and finish. Correct low and high areas as specified. Test unformed surfaces sloped to drain for trueness of slope and smoothness by using a template having the required slope. 1 Repair finished unformed surfaces containing defects that affect the concrete's durability Surface defects include crazing and cracks in excess of 0 01 inch wide or that penetrate to the reinforcement or completely through nonreinforced sections regardless of width, spalling, popouts, honeycombs, rock pockets, and other objectionable conditions. 2. Correct high areas in unformed surfaces by grinding after concrete has cured at least 14 days. 3 Correct low areas in unformed surfaces during or immediately after completing surface finishing operations by cutting out low areas and replacing with patching mortar Finish repaired areas to blend into adjacent concrete. Proprietary underlayment compounds may be used when acceptable to Architect. 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 03300 PAGE 15 CAST -IN-PLACE CONCRETE 4 Repair defective areas, except random cracks and single holes not exceeding 1 inch in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and expose reinforcing steel with at least 3/4 -inch clearance all around. Dampen concrete surfaces in contact with patching concrete and apply bonding agent. Mix patching concrete of same materials to provide concrete of same type or class as original concrete. Place, compact, and finish to blend with adjacent finished concrete. Cure in same manner as adjacent concrete. E. Perform structural repairs with prior approval of Architect for method and procedure, using specified epoxy adhesive and mortar F Repair methods not specified above may be used, subject to acceptance of Architect. 3.16 CLEANING AND PROTECTION A. Clean concrete and comply with Section 01710 Final Cleaning. B. After cleaning, apply 07180 Water Repellents. 3.17 QUALITY CONTROL TESTING DURING CONSTRUCTION A. General. The Owner will employ a testing agency to perform tests and to submit test reports. B Sampling and testing for quality control during concrete placement may include the following, as directed by Architect. 1 Sampling Fresh Concrete ASTM C 172, except modified for slump to comply with ASTM C 94 a. Slump ASTM C 143 one test at point of discharge for each day's pour of each type of concrete; additional tests when concrete consistency seems to have changed. b. Air Content: ASTM C 173 volumetric method for lightweight or normal weight concrete; ASTM C 231 pressure method for normal weight concrete; one for each day's pour of each type of air- entrained concrete. c. Concrete Temperature: ASTM C 1064 one test hourly when air temperature is 40 deg F (4 deg C) and below when 80 deg F (27 deg C) and above, and one test for each set of compressive strength specimens. d. Compression Test Specimen. ASTM C 31 one set of four standard cylinders for each compressive strength test, unless otherwise directed. Mold and store cylinders for laboratory-cured test specimens except when field -cured test specimens are required. e. Compressive Strength Tests: ASTM C 39• one set for each day's pour exceeding 5 cu. yd, one specimen tested at 7 days, two specimens tested at 29 days, and one specimen retained in reserve for later testing if required. 2. When frequency of testing will provide fewer than five strength tests for a given class of concrete, conduct testing from at least five randomly selected batches or from each batch if fewer than five are used. 3 When strength of field -cured cylinders is less than 85 percent of companion laboratory- cured cylinders, evaluate current operations and provide corrective procedures for protecting and curing the in -place concrete. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 4 Strength level of concrete will be considered satisfactory if averages of sets of three consecutive strength test results equal or exceed specified compressive strength and no individual strength test result falls below specified compressive strength by more than 500 psi. C. Test results will be reported in writing, to Architect, Structural Engineer, ready -mix producer and Contractor within 24 hours after tests. Reports of compressive strength tests shall contain the Project identification name and number date of concrete placement, name of concrete testing service, concrete type and class, location of concrete batch in structure, design compressive strength at 28 days, concrete mix proportions and materials, compressive breaking strength, and type of break for both 7-day tests and 28-day tests. D Nondestructive Testing: Impact hammer sonoscope, or other nondestructive device may be permitted but shall not be used as the sole basis for acceptance or rejection. E. Additional Tests: The testing agency will make additional tests of in -place concrete when test results indicate specified concrete strengths and other characteristics have not been attained in the structure, as directed by Architect. Testing agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 42, or by other methods as directed. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 03300 PAGE 16 CAST -IN-PLACE CONCRETE END OF SECTION 03300 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes architectural precast concrete units, plant cast. B. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 7 Section "Flashing and Sheet Metal" for flashing receivers and reglets. 2. Division 7 Section "Joint Sealants" for elastomeric joint sealants and sealant backings. 1.3 PERFORMANCE REQUIREMENTS A. Structural Performance Engineer, fabricate, and install architectural precast concrete units to withstand design loads within limits and under conditions indicated. B Engineering Responsibility Engage a fabricator who utilizes a qualified professional engineer to prepare design calculations, Shop Drawings, and other structural data for architectural precast concrete units. 1.4 SUBMITTALS SECTION 03450 PAGE 1 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data and instructions for manufactured materials and products. C. Shop Drawings prepared by or under the supervision of a qualified professional engineer detailing fabrication and installation of architectural precast concrete units. Indicate member locations, plans, elevations, dimensions, shapes, cross sections, and types of reinforcement, including special reinforcement. Include locations and details of hoisting points and lifting devices for handling and erection. 1 Indicate separate face and back -up mix locations and thicknesses. 2. Indicate welded connections by AWS standard symbols. Detail loose, cast -in, and field hardware, inserts, connections, and joints, including accessories. 3 Indicate locations and details of anchorage devices that are to be embedded in other construction. 4 For architectural precast concrete units indicated to comply with performance requirements, include engineering analysis data sealed and signed by the qualified professional engineer responsible for their preparation. D Samples for verification, approximately 12 by 12 by 2 inches, of pre -cast units at Short Stay addition, to illustrate quality of finishes, colors, and textures of exposed surfaces of architectural precast concrete units. Obtain approval of sample prior to fabricating final units. E. Full Scale Mock -up, approximately 4 feet wide, of pre -cast fascia panel at North Addition. Deliver mock -up to site. Provide adequate time for Owner and Architect review so as not to MAHLUM NORDFORS McK INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 03450 PAGE 2 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST delay schedule of the Work. Do not fabricate remaining panels until mock -up is approved. Accepted mock -up may be incorporated into the Work. F Welder certificates signed by Contractor certifying that welders comply with requirements specified under the "Quality Assurance" Article. G. Desigfi mixes for each concrete mix. H. Material test reports from a qualified independent testing agency evidencing compliance with requirements of the following based on comprehensive testing of current materials: 1. Concrete materials. 2. Reinforcing materials. I. Material certificates in lieu of agency test reports, when permitted by Architect, signed by fabricator certifying that each material item complies with requirements. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed architectural precast concrete work similar in material, design, and extent to that indicated for this Project and with a record of successful in -service performance. B. Fabricator Qualifications: Engage a firm experienced in producing architectural precast concrete units similar to those indicated for this Project and with a record of successful in- service performance, as well as sufficient production capacity to produce required units without delaying the Work. 1 Fabricator must participate in the Precast/Prestressed Concrete Institute's (PCI) Plant Certification Program and be designated a PCI Certified Plant for Group Al Architectural Concrete. 2. Fabricator shall be registered and approved by authorities having jurisdiction. C. Testing Agency Qualifications: To qualify for approval, an independent testing agency must demonstrate to Architect's satisfaction, based on evaluation of agency submitted criteria conforming to ASTM C 1077 and ASTM E 329 that it has the experience and capability to satisfactorily conduct the testing indicated without delaying the Work. D Professional Engineer Qualifications: A professional engineer who is legally authorized to practice in the jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of precast concrete units that are similar to that indicated for this Project in material, design, and extent. E. PCI Design Standard: Comply with recommendations of PCI's MNL -120 "PCI Design Handbook— Precast and Prestressed Concrete" applicable to types of architectural precast concrete units indicated. F ACI Publications: Comply with applicable provisions of the following ACI publications: 1 ACI 318 "Building Code Requirements for Reinforced Concrete." G. Welding Standards: Comply with applicable provisions of AWS D1 1 "Structural Welding Code Steel" and AWS D1.4 "Structural Welding Code— Reinforcing Steel." 1 Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 03450 PAGE 3 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST H. Field samples, approximately 36 by 48 inches (900 by 1200 mm), of architectural precast concrete; in sets of 3 for each finish, color, and texture required, demonstrating the range of variations expected in these characteristics. Design modifications may be made as necessary to meet field conditions and to ensure proper fitting of the Work as acceptable to Architect. Maintain general design concept shown without i ncreasing or decreasing sizes of architectural precast concrete units or altering profiles and alignments shown. Revise and submit complete design calculations and Drawings prepared by a qualified professional engineer when design modifications are required. 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver precast concrete units to Project site in such quantities and at such times to ensure continuity of installation. Store units at Project site to prevent cracking, distorting, warping, staining, or other physical damage, and so that markings are visible. B. Lift and support units only at designated lifting or supporting points shown on Shop Drawings. 17 SEQUENCING A. Supply anchorage items to be embedded in or attached to other construction without delaying the Work. Provide setting diagrams, templates, instructions, and directions, as required, for installation. PART 2- PRODIJCTS 2.1 FABRICATORS A. Available Fabricators: Subject to compliance with requirements, fabricators offering products that may be incorporated in the Work include, but are not limited to, the following: 1 Architectural Cast Stone, Santa Ana, California (714) 543 -6062 2. Olympian Precast Inc. Redmond, Washington, (206) 868 -1400 3 Others as approved by addendum 2.2 MOLD MATERIALS A. Forms: Provide forms and, where required, form facing matenals of metal, plastic, wood, or another acceptable material that is nonreactive with concrete and will produce required finish surfaces. 2.3 REINFORCING MATERIALS A. Reinforcing Bars: ASTM A 615 Grade 60 deformed. B. Low- Alloy -Steel Reinforcing Bars: ASTM A 706, Grade 60 C. Galvanized Reinforcing Bars: ASTM A 767 Class II, 2 oz. /sq. ft. zinc, hot -dip galvanized. D Steel- Welded Wire Fabric: ASTM A 185 plain, cold drawn. 2.4 CONCRETE MATERIALS A. Portland Cement: ASTM C 150 Type I or Type III. 1 Use only one brand, type, and color of cement from the same mill throughout Project. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Lighaeight Aggregates: ASTM C 330 SECTION 03450 PAGE 4 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST 2. Standard gray portland cement may be used for nonexposed back -up concrete. B. Normal- Weight Aggregates: Graded and washed crushed stone such as granite, marble, quartz, limestone, or other durable stone meeting ASTM C 33 with coarse aggregates meeting Class 5S and MNL -117 requirements. D Water Potable; free from deleterious material that may affect color stability setting, or strength of concrete. E. Air- Entraining Admixture: ASTM C 260 certified by manufacturer to be compatible with other required admixtures. F Coloring Agent: ASTM C979 synthetic mineral oxide pigments or colored water reducing admixtures, color stable, nonfading, resistant to lime and other alkalis Match existing color at Short Stay Addition. 2.5 CONNECTION MATERIALS A. Steel Shapes and Plates: ASTM A 36 B Malleable Iron Castings: ASTM A 47 C. Carbon -Steel Plates: ASTM A 283 D Carbon -Steel Bolts and Studs: ASTM A 307 Grade A, carbon steel, hex -head bolts and studs; carbon -steel nuts; and flat, =hardened steel washers. E. Hot -Dip Galvanized Finish. For exterior steel items, steel in exterior walls, and items indicated for galvanizing, apply zinc coating by the hot -dip process, complying with ASTM A 123 or ASTM A 153 as applicable. F Galvanizing Repair Paint: High- zinc dust content paint with dry film containing not less than 94 percent zinc dust by weight, and complying with DOD -P 21035A or SSPC -Paint 20 G. Shop -Primed Finish. Prepare surfaces of nongalvanized steel items, except those surfaces to be embedded in concrete, according to requirements of SSPC -SP 3 and shop -apply primer according to SSPC -PA 1 1 Primer Fast curing, lead- and chromate -free, VOC- conforming, universal modified alkyd primer with good resistance to normal atmospheric corrosion, complying with SSPC -Paint 25 or the performance requirements of FS TT-P-664 H. Accessories: Provide clips, hangers, plastic shims, and other accessories required to install architectural precast concrete units. 2.6 BEARING PADS A. Provide bearing pads for architectural precast concrete units as follows: 1 Elastomeric Pads: AASHTO M 251, plain, vulcanized, 100 percent polychloroprene (neoprene) elastomer, molded to size or cut from a molded sheet, 50 to 70 shore A clinometer, minimum tensile strength 2250 psi (15.5 MPa) per ASTM D 412. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.7 GROUT MATERIALS 2.8 CONCRETE MIXES A. Prepare design mixes for each type of concrete required. 2.9 MOLDS 2.10 FABRICATION SECTION 03450 PAGE 5 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST A. Cement Grout: Portland cement, ASTM C 150, Type I, and clean, natural sand, ASTM C 404 Mix at ratio of 1 part cemtnt to 2 1/2 parts sand, by volume, with minimum water required for placement and hydration. B. Design mixes may be prepared by a qualified independent testing agency or by qualified architectural precast manufacturing plant personnel at architectural precast fabricator's option. C. Limit water- soluble chloride ions to the maximum percentage by weight of cement permitted by ACI 318 (ACI 318M). D Add air entraining admixture at manufacturer's prescribed rate to result in normal- weight concrete at point of placement having an air content complying with MNL -117 requirements. E. Water Absorption. 12 to 14 percent by volume tested according to MNL -117 F When included in design mixes, add other admixtures to concrete mixes according to manufacturer's directions. A. Accurately construct molds, mortar tight, of sufficient strength to withstand pressures due to concrete placing operations, temperature changes, and for pretensioning and detensioning operations. B Maintain molds to provide completed architectural precast concrete units of shapes, lines, and dimensions indicated, within fabrication tolerances specified. A. Accurately position cast -in anchors, inserts, plates, angles, and other anchorage hardware for attachment of loose hardware and secure in place during precasting operations. Locate anchorage hardware where it does not affect the position of the main reinforcement or the placing of concrete. B. Supply loose steel plates, clip angles, seat angles, anchors, dowels, cramps, hangers, and other hardware shapes not provided by other trades necessary for securing architectural precast concrete units to supporting and adjacent members. C. Reinforcement: Comply with the recommendations of CRSI's "Manual of Standard Practice' for fabricating, placing, and supporting reinforcement. 1. Clean reinforcement of loose rust and mill scale, earth, and other materials that reduce or destroy the bond with concrete. 2. Accurately position, support, and secure reinforcement against displacement during concrete placement and consolidation operations. Completely conceal support devices to prevent exposure on finished surfaces. Do not use plastic- coated or uncoated metal chair supports. 3 Place reinforcement to maintain at least 3/4 -inch minimum cover after finishing. Arrange, space, and securely tie bars and bar supports to hold reinforcement in position MA.HLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 03450 PAGE 6 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST while placing concrete. Direct wire tie ends away from finished, exposed concrete surfaces. 4 Install welded wire fabric in lengths as long as practicable. Lap adjoining pieces at least one full mesh and lace splices with wire. Offset laps of adjoining widths to prevent continuous laps in either direction. D Reinforce architectural precast concrete units to resist handling, transportation, and erection stresses. E. Mix concrete according to MNL -117 and requirements of this Section. Following concrete batching, no additional water may be added. F Place concrete in a continuous operation to prevent seams or planes of weakness from developing in precast units. Comply with requirements of MNL -117 for measuring, mixing, transporting, and placing concrete. G. Thoroughly consolidate placed concrete by internal and external vibration without dislocating or damaging reinforcement and built -in items. Use equipment and procedures complying with MNL -117 1 Comply with ACI 306R procedures for cold weather concrete placement. 2. Comply with ACI 305R procedures for hot weather concrete placement. H. Identify pickup points of architectural precast concrete units and orientation in structure with permanent markings, complying with markings indicated on Shop Drawings. Imprint casting date on each architectural precast concrete unit on a surface that will not show in the finished structure. I. Cure concrete according to the requirements of MNL -117 by moisture retention without heat or by accelerated heat curing, using low- pressure live steam or radiant heat and moisture. J Fabricate architectural precast concrete units straight and true to size and shape with exposed edges and corners precise and true. 1 Edge and Corner Treatment: Uniformly chamfered. K. Discard architectural precast concrete units that are warped, cracked, broken, spalled, stained, or otherwise defective unless repairs are permitted by Architect and meet requirements. 2.11 FABRICATION TOLERANCES A. Comply with the following overall height and width dimensional tolerances of finished units measured at face adjacent to mold at time of casting: 1 10 Feet or Less: Plus or minus 1/8 inch. 2. 10 to 20 Feet: Plus 1/8 inch, minus 3/16 inch. B. Angular Deviation of Plane of Side Mold. Plus or minus 1/32 inch per 3 -inch depth or plus or minus 1/16 -inch total, whichever is greater C. Out of Square: Difference in length of two diagonal measurements of 1/8 inch per 72 inches or I/2 -inch total, whichever is greater D Thickness: Minus 1/8 inch, plus 1/4 inch. E. Locations of Reveals and Architectural Features: Plus or minus 1/8 inch. i MAHLUM NORDFORS Mc INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.12 FINISHES A. Finish exposed -face surfaces of architectural precast concrete units to match existing adjacent precast units. B. Finish exposed -back surfaces of architectural precast concrete units by smooth, steel -trowel Finish. C. Finish unexposed surfaces of architectural precast concrete units by float finish. 2.13 SOURCE QUALITY CONTROL SECTION 03450 PAGE 7 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST A. The Owner may employ an independent testing agency to evaluate architectural precast concrete fabricator's quality control and testing methods. 1 Allow Owner's testing agency access to material storage areas, concrete production equipment, concrete placement, and curing facilities. Cooperate with Owner's testing agency and provide samples of materials and concrete mixes as may be requested for additional testing and evaluation. B Quality Control Testing: Test and inspect architectural precast concrete according to MNL- 117 requirements. C. Strength of architectural precast concrete units will be considered deficient when they fail to comply with ACI 318 requirements. D Testing: When there is evidence that the strength of architectural precast concrete units may be deficient or may not meet ACI 318 requirements, the Owner will employ an independent testing agency to obtain, prepare, and test cores drilled from hardened concrete to determine compressive strength according to ASTM C 42. 1 A minimum of 3 representative cores will be taken from architectural precast concrete units of suspect strength, from locations directed by Architect. 2. Cores will be tested in an air-dry condition. 3 Strength of concrete for each series of 3 cores will be considered satisfactory if the average compressive strength is equal to at least 85 percent of the 28-day design compressive strength and no single core is less than 75 percent of the 28-day design compressive strength. 4 Test results will be made in writing on the same day that tests are made, with copies to Architect, Contractor, and precast fabricator Test reports will include the Project identification name and number, date, name of precast concrete fabricator, name of concrete testing agency identification letter, name, and type of architectural precast concrete unit or units represented by core tests; design compressive strength, compressive strength at break and type of break, corrected for length diameter ratio, and direction of applied load to core with respect to horizontal plane of concrete as placed. E. Patching: Where core test results are satisfactory and architectural precast concrete units meet requirements, solidly fill core holes with patching mortar and finish to match adjacent concrete surfaces. F Defective Work: Discard architectural precast concrete units that do not conform to requirements, including strength, manufacturing tolerances, and finishes. Replace with architectural precast concrete units that meet requirements. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 3- EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions for compliance with requirements for installation tolerances, true and level bearing surfaces, and other conditions affecting performance of architectural precast concrete units. Do not proceed with installation until unsatisfactory conditions have been corrected. SECTION 03450 PAGE 8 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST B. Do not install architectural precast units until supporting concrete has attained minimum allowable design compressive strength. 3.2 INSTALLATION A. Install clips, hangers, and other accessories required for connecting architectural precast concrete units to supporting members and back -up materials. B. Install architectural precast concrete units plumb, level, and in alignment. Provide temporary supports and bracing as required to maintain position, stability and alignment as units are being permanently connected. 1. Maintain horizontal and vertical joint alignment and uniform joint width as erection progresses. 2. Remove projecting hoisting devices and cement -grout fill recessed hoisting devices. C. Anchor architectural precast concrete units in position by bolting, welding, grouting, or as otherwise indicated. Remove temporary shims, wedges, and spacers as soon as possible after anchoring and grouting are completed. D Welding: Perform welding in compliance with AWS D1 1 and AWS D1 4 with qualified welders. 1 Protect architectural precast concrete units and bearing pads from damage by field welding or cutting operations and provide noncombustible shields as required. 2. Repair damaged steel surfaces by cleaning and applying a coat of galvanizing repair paint to galvanized surfaces. 3 Repair damaged steel surfaces by cleaning and repriming damaged painted surfaces. E. At bolted connections use lock washers or other acceptable means to prevent loosening of nuts. F Grouting Connections: Grout connections where required or indicated. Retain grout in place until hard enough to support itself. Pack spaces with stiff grout material, tamping until voids are completely filled. Place grout to finish smooth, plumb, and level with adjacent concrete surfaces. Keep grouted joints damp for not less than 24 hours after initial set. Promptly remove grout material from exposed surfaces before it hardens. 3.3 ERECTION AND LOCATION TOLERANCES A. Install architectural precast concrete units level, plumb, square, and true, without exceeding the reconunended erection and location tolerances of MNL -117 B. Erection Tolerances: Install architectural precast concrete units so that each unit after erection complies with following dimensional requirements: 1. Concave or convex bowing of any part of a flat surface not to exceed length of bow /360 with a maximum of 1 inch and up to 30 feet. J MAHLUM NORDFORS McIdNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 REPAIRS SECTION 03450 PAGE 9 ARCHITECTURAL PRECAST CONCRETE —PLANT CAST 2. Maximum warpage of 1 corner out of plane of other 3 the greater of 1/16 inch per 12- inch distance from nearest adjacent corner C. Tolerances for Location of Architectural Precast Units: Fabricate and erect architectural precast concrete units so that joints between units do not exceed the following. Alignment for exterior units is outside face. e 1 Face Width of Joints: Plus or minus 1/4 inch. 2. Joint Taper 1/40 inch per 12 -inch length, with maximum length of taper over 10 feet of 1/4 inch. 3 Step in Face: 1/4 inch. 4 Jog in Alignment of Edges: 1/4 inch. 5 Jog in Alignment of Reveals: 1/4 inch. 6 Plumb in Any 10 Feet of Element Height: 1/4 inch. 7 Variation from Level. Plus or minus 1/2 inch m any 40 -foot run. 8. Top Elevation from Nominal Top Elevation. Plus or minus 1/4 inch for exposed individual panel, 1/4 inch exposed relative to adjacent panel. A. Repair exposed exterior surfaces of architectural precast concrete units to match color, texture, and uniformity of surrounding concrete when permitted by Architect. B Remove and replace damaged architectural precast concrete units when repairs do not meet requirements. 3.5 CLEANING A. Clean exposed surfaces of architectural precast concrete units after erection to remove weld marks, other markings, dirt, and stains. 1 Wash and rinse according to architectural precast concrete fabricator's recommendations. Protect other work from staining or damage due to cleaning operations. 2. Do not use cleaning materials or processes that could change the appearance of exposed architectural precast concrete finishes. C 1997 Mahhun Nordfors McKinley Gordon END OF SECTION 03450 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL SECTION 03650 PAGE 1 CEMENTITIOUS UNDERLAYMENT 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary C onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes trowel grade Portland cement based, latex modified cementitious underlayment for smoothing concrete substrates and creating pitches to drain. B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 3 Section `Cast in Place Concrete. 2. Division 9 Section `Resilient Tile Flooring. 3 Division 9 Section `Sheet Vinyl Floor Covering. 4 Division 9 Section `Carpet. 1.4 SUBMITTALS A. General. Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B Product Data. Submit manufacturer's published literature including specifications, physical characteristics and performance data. Submit as a supplement installation instructions if not included in published literature. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Applicator specializing in performing the work and approved by manufacturer of product system specified. B Single Source Responsibility Obtain all components of underlayment system from a single manufacturer C. Performance Requirements: Provide products which resist indentation, bond tightly and are non injurious to adhesives and floor finishes specified. 1.6 DELIVERY STORAGE AND HANDLING A. Comply with manufacturer's instructions. B Handle, store, and protect from contamination and dampness. 1.7 PROJECT CONDITIONS A. Verify conditions at site affecting work are suitable for the best installation per industry standards. Notify Architect of any defects and do no work until defects are corrected. MAIILUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 2- PRODUCTS PART 3- XECUTION 3.1 EXAMINATION 3.2 PREPARATION SECTION 03650 PAGE 2 CEMENTITIOUS UNDERLAYMENT 2.1 MANUFACTURERS A. Manufacturer Subject to compliance with requirements, provide products by one of the following: 1 Raeco, Inc. 2. Others as approved by addendum. B. Quality Standard Product: Raeco R -25 2.2 MATERIALS A. Trowelable Underlayment: Design mix to produce topping material with the following characteristics: 1. Compressive strength. Minimum 2800 psi at 28 days. 2. Tensile strength. 750 psi at 28 days. 3 Flexural strength. 1600 psi at 28 days. B. Primer Manufacturer's standard primer compatible with underlayment product: 1 Quality Standard Product: Raeco -Bond. A. Verify and inspect existing conditions prior to beginning work. Report any defects to Architect and do no work until unsatisfactory conditions are corrected. Beginning work constitutes acceptance of substrate. A. Clean substrate surfaces of dirt, wax, sealers, curing compounds, efflorescence, or other contaminants that would be detrimental to underlayment material bonding to substrate. Blastrac or shot blast areas where existing flooring has been removed, if recommended by underlayment manufacturer B. Underlayment may be applied over mastics and other flooring residue only if acceptable to the manufacturer and in accordance with their instructions. Remove and replace any underlayment which fails due to condition of substrate. C. Vacuum surfaces clean and apply specified bonding agent primer in accordance with manufacturer' s directions. 3.3 APPLICATION A. Mix and apply in accordance with manufacturer's directions and bring to true and level surface, or to indicated slopes where drainage is required. 1 For thicknesses from 1/2 inch to 1 inch, underlayment compound may be bulked with clean, graded #8 Silica sand or a Traction Grit sand in proportions allowed by manufacturer 2. For thicknesses greater than 1 inch, use a clean, sharp rock such as marble chips. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS B. Smooth surfaces to a feather edge. No humps or depressions will be accepted. C. Finish sealer (if required) as recommended by underlayment manufacturer 3.4 TOLERANCES 3.5 PROTECTION 3.6 SCHEDULE 0 1997 Mahlum Nordfors McKuiley Gordon SECTION 03650 PAGE 3 CEMENTITIOUS UNDERLAYMENT A. Top Surface Tolerance permitted is 1/8 inch clearance using a 10 foot straight -edge in any direction. A. Keep latex underlayment clear of all traffic until firmly set. Allow to cure as per manufacturer's directions. A. Provide underlayment in all areas of work where new flooring is scheduled over existing slabs. Allow for average 1/4 inch thickness. Do not exceed 1 inch thickness. END OF SECTION 03650 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Concrete unit masonry 1.3 SYSTEM PERFORMANCE REQUIREMENTS SECTION 04200 PAGE 1 UNIT MASONRY B Related Sections: The following sections contain requirements that relate to this Section. 1 Division 7 Section "Flashing and Sheet Metal" for exposed and concealed sheet metal flashing installed in masonry 2. Division 7 Section `Insulation' for exterior wall cavity insulation. 3 Division 7 Section Joint Sealers' for sealants and compressible material. 4 Division 10 Section 'Louvers and Vents" for wall vents. C. Products installed but not furnished under this Section include the following: 1 Steel lintels in unit masonry are specified in Division 5 Section "Metal Fabrications." 2. Hollow metal frames in unit masonry openings are specified in Division 8 Section Steel Doors and Frames." A. Provide unit masonry that develops the following installed compressive strengths (f m) 1 For concrete unit masonry f m 1500 psi unless otherwise indicated. 1.4 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B Product data for each different masonry unit, accessory and other manufactured product indicated. C Material certificates for the following signed by manufacturer and Contractor certifying that each material complies with requirements. 1 Each different cement product required for mortar and grout including name of manufacturer, brand, type, and weight slips at time of delivery 2 Each type and size of joint reinforcement. 3 Each type and size of anchors, ties, and metal accessories. D Cold- weather construction procedures evidencing compliance with requirements specified in referenced unit masonry standard. E. Hot weather construction procedures evidencing compliance with requirements specified in referenced unit masonry standard. MAHLUM NORDFORS MCKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 04200 PAGE 2 UNIT MASONRY 1.5 QUALITY ASSURANCE A. Unit Masonry Standard. Comply with ACI 530 1 /ASCE 6 "Specifications for Masonry Structures," except as otherwise indicated. B. Single Source Responsibility for Masonry Units: Obtain exposed masonry units of uniform textutb and color or a uniform blend within the ranges accepted for these characteristics, from one manufacturer for each different product required for each continuous surface or visually related surfaces. In exposed work, do not use masonry units with chips, cracks, voids, discolorations, or other defects which might be visible or cause staining in the finished work. C. Single Source Responsibility for Mortar Materials: Obtain mortar ingredients of uniform quality including color for exposed masonry from one manufacturer for each cementitious component and from one source and producer for each aggregate. 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver masonry materials to project in undamaged condition. Protect masonry materials from moisture during delivery B. Store and handle masonry units off the ground, under cover and in a dry location to prevent their deterioration or damage due to moisture, temperature changes, contaminants, corrosion, and other causes. If units become wet, do not place until units are in an air -dried condition. C. Store cementitious materials off the ground, under cover and in dry location. D Store aggregates where grading and other required characteristics can be maintained and contamination avoided. E. Store masonry accessories including metal items to prevent corrosion and accumulation of dirt and oil. 1.7 PROJECT CONDITIONS A. Protection of Masonry During erection, cover tops of walls, projections, and sills with waterproof sheeting at end of each day's work. Cover partially completed masonry when construction is not in progress. 1 Extend cover a minimum of 24 inches down both sides and hold cover securely in place. When work is resumed, clean top surfaces of loose mortar and other foreign matter B Cutting of Block: Cut units with motor driven saw designed to cut masonry with clean, sharp, unchipped edges. Cut units as required to provide specified bond pattern and to fit adjoining work neatly Use full units without cutting wherever possible. C. Stain Prevention. Prevent grout, mortar, and soil from staining the face of masonry to be left exposed or painted. Remove immediately any grout, mortar and soil that come in contact with such masonry 1 Protect base of walls from rain- splashed mud and mortar splatter by means of coverings spread on ground and over wall surface. 2. Protect sills, ledges, and projections from mortar droppings. 3 Protect surfaces of window and door frames, as well as similar products with painted and integral finishes from mortar droppings. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Cold- Weather Construction. Comply with referenced unit masonry standard for cold weather construction and the following: 1 Do not lay masonry units that are wet or frozen. 2. Remove masonry damaged by freezing conditions. E. Hot Weather Construction. Comply with referenced unit masonry standard. PART 2 PRODUCTS 2.1 MATERIALS, GENERAL A. Comply with referenced unit masonry standard and other requirements specified in this Section applicable to each material indicated. 2.2 CONCRETE MASONRY UNITS (CMU) SECTION 04200 PAGE 3 UNIT MASONRY A. General. Comply with requirements indicated below applicable to each form of concrete masonry unit required. 1 Provide special shapes where indicated and as follows: a. Square -edged units for outside corners, except where indicated as bullnose. 2. Size: Provide concrete masonry units complying with requirements indicated below for size that are manufactured to specified face dimensions within tolerances specified in the applicable referenced ASTM specification for concrete masonry units. a. Concrete Masonry Units: Manufactured to specified dimensions of 3/8 inch less than nominal widths by nominal heights by nominal lengths indicated on drawings. b. Provide Type 1, moisture controlled units. c. Exposed Faces: Manufacturer's standard color and texture, unless otherwise indicated. 3 All masonry units to be 16 inches wide by 4 or 8 inches high (nominal) except as indicated on drawings. 4 All block and mortar shall contain the reconunended amount of integral water repellent and mix known as `Dry Block Systems' as manufactured by Forrer Industries, Inc. or Krete Dri Guard by Krete Industries. B Hollow Load- Bearing Concrete Masonry Units: ASTM C 90 Grade N and as follows: 1 Unit Compressive Strength. Provide units with minimum average net area compressive strength indicated below a. Not less than the unit compressive strengths required to produce concrete unit masonry construction of compressive strength indicated. 2. Weight Classification. Medium weight. D Masonry Unit Types (CMU) 1 Type 1 Smooth Face 2.3 MORTAR MIX FOR BLOCK A. General. Mortar shall comply with UBC Standard 24 -20 (ASTM C270). B Mortar Proportions: Type S or as approved to obtain prism test strengths. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS B Water Clean and fresh from public water system. C Sand. Well- graded masonry sand conforming to ASTM C144 SECTION 04200, PAGE 4 UNIT MASONRY C. Mortar Mixing 1 Submit formula and exact proportions to be used. 2. Measure ingredients accurately (a measuring box must be used)• mix by approved machine for at least 3 minutes but not more than 10 minutes. Shovel counts will not be allowed. 3 Use mortar containing cement within 2 hours after mixing. 4 Retemper mortar for workability as necessary within above time limit. 5 Use of mortar mixed more than 2 hours is prohibited. 6 Discard and remove from the site mortar or grout that has set. 7 Do not use admixtures in mortar unless with prior approval. 8. Do not use calcium chloride in mortar or grout. D Grout Mix: Refer to General Noteson Structural Drawings 2.4 MORTAR MATERIALS FOR CONCRETE MASONRY UNIT WALLS A. Cement: American Portland Cement conforming to ASTM C150 Type I or II, as selected by the Architect for color For exterior masonry the cement shall fulfill the further requirement that it shall exhibit no efflorescence when cast into the form of 2 -inch by 7 -inch by 1/2 -inch slabs comprising the cement under test. Ottawa plastic mortar sand and distilled water (in proportions of 1.2 by weight, with water added to produce 100 percent flow) and subjected to a 7-day `wick test' in general conformity with the methods described in ASTM C67 NOTE. Local sand may be used provided it meets the aforementioned requirements. D Lime: Approved brand of plastic hydrated, such as New England 4X, conforming to ASTM C207 Type S. 2.5 MORTAR AND GROUT MIXES FOR CONCRETE MASONRY UNIT WALLS A. General. Do not add admixtures, including coloring pigments, air- entraining agents, accelerators, retarders, water repellent agents, antifreeze compounds, or other admixtures, unless otherwise indicated. 1 Do not use calcium chloride in mortar or grout. B Mortar for Unit Masonry Comply with ASTM C270 Property Specification for job -mixed mortar and ASTM C1142 for ready -mixed mortar of types indicated below 1 For reinforced concrete unit masonry and where indicated, use Type S 2. For concrete unit masonry interior loadbearing walls; for interior nonloadbearing partitions, and for other applications where another type is not indicated, use Type N 3 For grout for unit masonry comply with general structural notes in structural drawings. MAHLUM NORDFORS McKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.6 REINFORCING STEEL 2.7 TIES AND ANCHORS, GENERAL, SECTION 04200 PAGE 5 UNIT MASONRY A. General. Provide reinforcing steel complying with requirements of referenced unit masonry standard and this article. B. Steel Reinforcing Bars: Material and grade as follows: Billet steel complying with ASTM A 615 2. Epoxy coated billet steel complying with ASTM A 615 and ASTM A 775 3 Grade 60 A. General. Provide ties and anchors specified in subsequent articles that comply with requirements for metal and size of referenced unit masonry standard and of this article. B Galvanized Steel Wire: ASTM A 82, with ASTM A153 Class B -2 coating for wire ties. C. Wire Diameter 0 1 875 inch. 2.8 EMBEDDED FLASHING MATERIALS A. Galvanized Sheet Metal Flashing: Fabricate from the following metal complying with requirements specified in Division 7 Section "Flashing and Sheet Metal" and below 1 Hot dipped galvanized steel (20- gauge) concealed flashing. 2. Fabricate through -wall metal flashings embedded in masonry as follows: 3 Fabricate metal expansion joint strips from sheet metal indicated above, formed to shape indicated. 4 Application. Use where flashing is fully or partly concealed in masonry wall. Use separation sheet between stainless steel and all other metals, including structural steel lintels and shelf angles. B Solder and Sealants for Sheet Metal Flashings: As specified in Division 7 section 'Flashing and Sheet Metal. C Fully Adhered Thru -Wall Flashing: Subject to compliance with requirements, provide as follows: 1 Membrane Flashing: Manufacturer's standard fully- adhered, self adhered, in -wall flashing membrane of type indicated below a. Membrane Wall Flashing System. 40 mil membrane, 32 mils of pliable and highly adhesive rubberized asphalt compound, completely and integrally bonded to an 8 -mil, high- density cross laminated polyethylene film; surface conditioner and termination mastic. b Application. Use where flashing is fully concealed in masonry c. Quality Standard Product: As follows, or approved equal 1) Perm- A- BarrierTM Wall Flashing by W.R. Grace Co. .2) Dur- O- Barrier by Dur- O -Wal. 2. Poly Fabric Underlayment a. Provide manufacturer's standard nonwoven polyester fabric weighing 6 0 ounces per square yard, white, nonswelling, rot/mildew resistant. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.9 MISCELLANEOUS MATERIALS A. Masonry Cleaners 1 Proprietary Acidic Cleaner Manufacturer's standard- strength general- purpose cleaner designed for removing mortar /grout stains, efflorescence, and other new construction stains form new masonry surfaces of type indicated below without discoloring or damaging masonry surfaces and without leaving any chloride residue; expressly approved for intended use by manufacturer of masonry units being cleaned. a. For masonry not subject to metallic oxidation stains, use formulation consisting of a manufacturer's standard strength blend of surface- acting acids, chelating, and wetting agents. 2. Products: Subject to compliance with requirements, a product that may be used to clean unit masonry surfaces includes, but is not limited to, the following: a. `Sure Klean No. 600 Detergent, ProSoCo, inc. b. `Sure Klean No. 101 Lime Solvent, ProSoCo, inc. c. `Sure Klean Vana Trol, ProSoCo, Inc. B Stainless Steel Drip Edge Flashing 1 Quality Standard Product: Dur -O -WaI Drip Edge Flashing 2. Material Stainless Steel 3 Finish. 2B 4 Gauge. 22 -gauge 5 Separate all stainless steel from all dissimilar materials with roofing felt 6 Lap 4 to 6' minimum with Butyl sealant between splices. C Source Quality Control 1 Concrete Masonry Unit Tests: For each type, class, and grade of concrete masonry unit indicated, units will be tested by qualified independent testing laboratory for strength, absorption, and moisture content per ASTM C 140 PART 3 EXECUTION 3.1 EXAMINATION A. Examine conditions, with Installer present, for compliance with requirements for installation tolerances and other specific conditions, and other conditions affecting performance of unit masonry 1 For the record, prepare written report, endorsed by Installer listing conditions detrimental to performance of unit masonry B. Examine rough -in and built -in construction to verify actual locations of piping connections pnor to installation. b. Products: Subject to compliance with requirements, products that may be incorporated in the Work include the following, or approved equal. 1) 'E-6-N Rufon.Fabric, Phillips Fibers Corporation C. Do not proceed until unsatisfactory conditions have been corrected. SECTION 04200 PAGE 6 UNIT MASONRY t 1 1 1 1 s 1 i 1 1 1 1 r 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 INSTALLATION, GENERAL 3.3 CONSTRUCTION TOLERANCES A. Comply with construction tolerances of referenced unit masonry standard. 3.4 LAYING MASONRY WALLS 3.5 MORTAR BEDDING AND JOINTING SECTION 04200 PAGE 7 UNIT MASONRY A. Comply with referenced unit masonry standard and other requirements indicated applicable to each type of installation included in Project. B Thickness: Build single -wythe walls to the actual thickness of the masonry units, using units of flominal thickness indicated. C. Cut masonry units with motor driven saws to provide clean, sharp, unchipped edges. Cut units as required to provide continuous pattern and to fit adjoining construction. Use full -size units without cutting where possible. At all corners which are not 90 degrees, miter cut units special shapes for these conditions are not required to be fabricated. A. Lay out walls in advance for accurate spacing of surface bond patterns with uniform joint widths and for accurate locating of openings, movement -type joints, returns, and offsets. Avoid the use of less than- half -size units at corners, jambs, and where possible at other locations. B. Lay up walls to comply with specified construction tolerances, with courses accurately spaced and coordinated with other construction. C Bond Pattern for Exposed Masonry Lay exposed masonry in a running bond. Do not use units with less than nominal 8 -inch horizontal face dimensions at corners or jambs. D Stopping and Resuming Work: In each course, rack back 1/2 -unit length for one -half running bond; do not tooth. Clean exposed surfaces of set masonry wet clay masonry units lightly (if required), and remove loose masonry units and mortar prior to laying fresh masonry E. Remove masonry units disturbed after laying. Clean and relay in fresh mortar Do not pound corners at jambs to fit stretcher units which have been set in position. If adjustments are required, remove units, clean off mortar, and reset in fresh mortar F Built -In Work: As construction progresses, build -in items specified under this and other Sections of the Specifications. Fill in solidly with masonry around built -in items. 1 Fill space between hollow metal frames and masonry solidly with mortar unless otherwise indicated. 2. Where built -in items are to be embedded in cores of hollow masonry units, place a layer of metal lath in the joint below and rod mortar or grout into core. 3 Fill cores in hollow concrete masonry units with grout 3 courses (24 inches) under bearing plates, beams, lintels, posts, and similar items, unless otherwise indicated. A. Lay hollow concrete masonry units as follows: 1 With full mortar coverage on horizontal and vertical face shells. 2. Bed webs in mortar in starting course on footings and in all courses of piers, columns, and pilasters, and where adjacent to cells or cavities to be filled with grout. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 04200 PAGE 8 UNIT MASONRY 3 For starting course on footings where cells are not grouted, spread out full mortar bed including areas under cells. B. Cut joints flush for masonry walls to be concealed or to be covered by other materials, unless otherwise indicated. C. Mort.* Joints: Make all joints of uniform thickness, approximately 3/8 inch. When mortar has stiffened slightly and before final set, tool mortar in joints with proper tool to achieve concave joints. Take care to see that all holes, depressions, cracks, and other defects are completely filled. Work mortar with tool to smooth and uniformly profiled shape. Upon completion of the work, re- inspect all joints; fill all cracks and holes; remove any loose mortar by cutting out; fill and tool to match other joints. D Head Joints: Use double- buttering or other method which ensures full head joints. 3.6 CAVITIES /AIR SPACES A. Keep cavities/air spaces clean of mortar droppings and other materials during construction. Strike joints facing cavities/air spaces flush. 3.7 INSTALLATION OF REINFORCED UNIT MASONRY A. General Install reinforced unit masonry to comply with requirements of referenced unit masonry standard. B Do not place grout until entire height of masonry to be grouted has attained sufficient strength to resist grout pressure. 3.8 FIELD QUALITY CONTROL A. General. The Owner will employ a testing laboratory to perform tests and inspections or will perform inspections themselves or a combination of both. B Testing and inspection or quality control may at Owner's option, include any or all of the following: 1 Testing and inspection of materials and installed masonry during construction including, but not limited to, the following: a. Compressive strength of grout per ASTM C1019 b Mortar composition and properties per ASTM C780 c. Special Inspection. Required for reinforced concrete masonry on a periodic basis as required by the Uniform Building Code, Section 1701 3.9 REPAIRING, POINTING, AND CLEANING A. Remove and replace masonry units that are loose, chipped, broken, stained, or otherwise damaged or if units do not match adjoining units. Install new units to match adjoining units and in fresh mortar or grout, pointed to eliminate evidence of replacement. B Pointing: During the tooling of joints, enlarge any voids or holes, except weep holes, and completely fill with mortar Point -up all joints including corners, openings, and adjacent construction to provide a neat, uniform appearance, prepared for application of sealants. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Cleaning: After mortar is thoroughly set and cured, clean exposed masonry as follows: 1 Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or chisels. 2. Protect adjacent stone and nonmasonry surfaces from contact with cleaner by covering them with liquid strippable masking agent, polyethylene film, or waterproof masking tape. 3 Wet wall surfaces with water prior to application of cleaners; remove cleaners promptly by rinsing thoroughly with clear water 4 Clean concrete masonry by means of cleaning method indicated• in NCMA TEK 45 applicable to type of stain present on exposed surfaces. D Protection. Provide final protection and maintain conditions, in a manner acceptable to Installer that ensure unit masonry is without damage and deterioration at time of Substantial Completion. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 04200 PAGE 9 UNIT MASONRY END OF SECTION 04200 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes structural steel. B. Related Sections: The following Sections contain requirements that relate to this Section: 1 Division 5 Section "Steel Deck" for field installation of shear connectors. 2. Division 5 Section "Metal Fabrications" for loose steel bearing plates and miscellaneous steel framing 3 Division 9.Section "Painting" for surface preparation and priming requirements. 1.4 SUBMITTALS SECTION 05120 PAGE 1 STRUCTURAL STEEL A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for each type of product specified. C. Shop Drawings detailing fabrication of structural steel components. 1 Include details of cuts, connections, splices, camber, holes, and other pertinent data. 2. Indicate welds by standard AWS symbols, distinguishing between shop and field welds, and show size, length, and type of each weld. 3 Indicate type, size, and length of bolts, distinguishing between shop and field bolts. Identify high strength bolted slip critical, direct- tension, or tensioned shear/bearing connections. D Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. E. Mill test reports signed by manufacturers certifying that their products, including the following, comply with requirements. 1 Structural steel, including chemical and physical properties. 2. Bolts, nuts, and washers, including mechanical properties and chemical analysis. 3 Shear stud connectors. 4 Shop primers. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed structural steel work similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05120 PAGE 2 STRUCTURAL STEEL B. Fabricator Qualifications: Engage a firm experienced in fabricating structural steel similar to that indicated for this Project and with a record of successful in- service performance, as well as sufficient production capacity to fabricate structural steel without delaying the Work. 1 Fabricator must participate in the AISC Quality Certification Program and be designated an AISC- Certified Plant as follows: `a. Category Conventional steel structures, CnBg. C. Comply with applicable provisions of the following specifications and documents: 1 AISC's "Specification for Structural Steel Buildings Allowable Stress Design and Plastic Design." D Welding Standards: Comply with applicable provisions of AWS D1 1 "Structural Welding Code— Steel." 1. Present evidence that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver structural steel to Project site in such quantities and at such times to ensure continuity of installation. B. Store materials to permit easy access for inspection and identification. Keep steel members off ground by using pallets, platforms, or other supports. Protect steel members and packaged materials from erosion and deterioration. 1 Store fasteners in a protected place. Clean and relubricate Bolts and nuts that become dry or rusty before use. 2. Do not store materials on structure in a manner that might cause distortion or damage to members or supporting structures. Repair or replace damaged materials or structures as directed. 1.7 SEQUENCING A. Supply anchorage items to be embedded in or attached to other construction without delaying the Work. Provide setting diagrams, templates, instructions, and directions, as required, for installation. PART 2- PRODIJCTS 2.1 MATERIALS A. Structural Steel Shapes, Plates, and Bars: As follows: 1. Carbon Steel. Per general notes on Structural Drawings. B. Cold- Formed Structural Steel Tubing: Per general notes on Structural Drawings. C. Steel Pipe: Per general notes on Structural Drawings. D Anchor Rods, Bolts, Nuts, and Washers: Per general notes on Structural Drawings. E. Welding Electrodes: Comply with AWS requirements. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.2 PRIMER SECTION 05120 PAGE 3 STRUCTURAL STEEL A. Primer Fast curing, lead- and chromate -free, universal modified -alkyd primer with good resistance to normal atmospheric corrosion, complying with performance requirements of FS TT-P -664 B. +Galvanizing Repair Paint: High- zinc dust content paint for regalvanizing welds and repair painting galvanized steel, with dry film containing not less than 93 percent zinc dust by weight, and complying with DOD- P- 21035A or SSPC -Paint 20 2.3 GROUT A. Metallic, Shrinkage Resistant Grout: Premixed, factory- packaged, ferrous aggregate grout, complying with ASTM C 1107 of consistency suitable for application, and a 30- minute working time. 2.4 FABRICATION A. Fabricate and assemble structural steel in shop to greatest extent possible. Fabricate structural steel according to AISC specifications referenced in this Section and in Structural Drawings. 1. Camber structural steel members where indicated. 2. Mark and match -mark materials for field assembly 3 Fabricate for delivery a sequence that will expedite erection and minimize field handling of structural steel. 4 Complete structural steel assemblies, including welding of units, before starting shop priming operations. 5 Comply with fabrication tolerance limits of AISC's "Code of Standard Practice for Steel Buildings and Bridges" for structural steel. B. Thermal Cutting: Perform thermal cutting by machine to greatest extent possible. 1 Plane thermally cut edges to be welded. C. Finishing: Accurately mill ends of columns and other members transmitting loads in bearing. D Holes: Provide holes required for securing other work to structural steel framing and for passage of other work through steel framing members, as shown on Structural Drawings. 1. Cut, drill, or punch holes perpendicular to metal surfaces. Do not flame -cut holes or enlarge holes by burning. Drill holes in bearing plates. 2. Weld threaded nuts to framing and other specialty items as indicated to receive other work. 2.5 SHOP CONNECTIONS A. Shop install and tighten nonhigh strength bolts, except where high strength bolts are indicated. B. Weld Connections: Comply with AWS D1.1 for procedures, appearance and quality of welds, and methods used in correcting welding work. 1. Assemble and weld built -up sections by methods that will maintain true alignment of axes without warp. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.7 SHOP PRIMING A. Shop prime steel of roof -top penthouse and screen walls only B. Shop prime steel surfaces, except the following: 1 Surfaces embedded in concrete or mortar Extend priming of partially embedded members to a depth of 2 inches. 2. Surfaces to be field welded. 3 Surfaces to receive sprayed -on fireproofing. 4 Galvanized surfaces. C. Surface Preparation. Clean surfaces to be painted. Remove loose rust, loose mill scale, and spatter, slag, or flux deposits. Prepare surfaces according to SSPC specifications as follows: 1 SSPC -SP 3 "Power Tool Cleaning." D Priming Immediately after surface preparation, apply primer according to manufacturer's instructions and at rate recommended by SSPC to provide a dry film thickness of not less than 1.5 mils. Use priming methods that result in full coverage of joints, corners, edges, and exposed surfaces. 1 Stripe paint corners, crevices, bolts, welds, and sharp edges. 2. Apply 2 coats of shop paint to inaccessible surfaces after assembly or erection. Change color of second coat to distinguish it from first. E. Painting: Apply a 1 -coat, nonasphaltic primer complying with SSPC's "Painting System Guide No. 7 00" to provide a dry film thickness of not less than 1.5 mils. 2.8 GALVANIZING SECTION 05120 PAGE 4 STRUCTURAL STEEL A. Hot -Dip Galvanized Finish. Apply zinc coating by the hot -dip process to structural steel indicated for galvanizing according to ASTM A 123 2.9 SOURCE QUALITY CONTROL A. Owner will engage an independent testing and inspecting agency to perform shop inspections and tests and to prepare test reports. 1 Testing agency will conduct and interpret tests and state in each report whether test specimens comply with or deviate from requirements. 2. Provide testing agency with access to places where structural steel Work is being fabricated or produced so required inspection and testing can be accomplished. B. Correct deficiencies in or remove and replace structural steel that inspections and test reports indicate do not comply with specified requirements. C. Additional testing, at Contractor's expense, will be performed to determine compliance of corrected Work with specified requirements. D Shop bolted connections will be tested and inspected according to RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts." E. In addition to visual inspection, shop welded connections will be inspected and tested according to AWS D1 1 and the inspection procedures listed below at testing agency's option. 1 Liquid Penetrant Inspection. ASTM E 165 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.3 ERECTION SECTION 05120 PAGE 5 STRUCTURAL STEEL 2. Magnetic Particle Inspection: ASTM E 709• performed on root pass and on finished weld. Cracks or zones of incomplete fusion or penetration will not be accepted. 3 Radiographic Inspection: ASTM E 94 and ASTM E 142; minimum quality level "2- 2T" 4 Ultrasonic Inspection. ASTM E 164 PART 3- EXECUTION 3.1 EXAMINATION A. Before erection proceeds, and with the steel erector present, verify elevations of concrete and masonry bearing surfaces and locations of anchorages for compliance with requirements. B. Do not proceed with erection until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Provide temporary shores, guys, braces, and other supports during erection to keep structural steel secure, plumb, and in alignment against temporary construction loads and loads equal in intensity to design loads. Remove temporary supports when permanent structural steel, connections, and bracing are in place, unless otherwise indicated. 1 Do not remove temporary shoring supporting composite deck construction until cast -in- place concrete has attained its design compressive strength. A. Set structural steel accurately in locations and to elevations indicated and according to AISC specifications referenced in this Section. B. Base and Bearing Plates: Clean concrete and masonry bearing surfaces of bond- reducing materials and roughen surfaces prior to setting base and bearing plates. Clean bottom surface of base and bearing plates. 1 Set base and bearing plates for structural members on wedges, shims, or setting nuts as required. 2. Tighten anchor bolts after supported members have been positioned and plumbed. Do not remove wedges or shims but, if protruding, cut off flush with edge of base or bearing plate prior to packing with grout. 3 Pack grout solidly between bearing surfaces and plates so no voids remain. Finish exposed surfaces, protect installed materials, and allow to cure. a. Comply with manufacturer's instructions for proprietary grout materials. C. Maintain erection tolerances of structural steel within AISC's "Code of Standard Practice for Steel Buildings and Bridges." D Align and adjust various members forming part of complete frame or structure before permanently fastening. Before assembly clean bearing surfaces and other surfaces that will be in permanent contact. Perform necessary adjustments to compensate for discrepancies in elevations and alignment. 1. Level and plumb individual members of structure. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05120 PAGE 6 STRUCTURAL STEEL 2. Establish required leveling and plumbing measurements on mean operating temperature of structure. Make allowances for difference between temperature at time of erection and mean temperature at which structure will be when completed and in service. E. Splice members only where indicated. F Remote erection bolts on welded, architecturally exposed structural steel; fill holes with plug welds; and grind smooth at exposed surfaces. G. Do not use thermal cutting during erection. H. Finish sections thermally cut during erection equal to a sheared appearance. I. Do not enlarge unfair holes in members by burning or by using drift pins. Ream holes that must be enlarged to admit bolts. 3.4 FIELD CONNECTIONS A. Install and tighten nonhigh strength bolts, except where high strength bolts are indicated. B. Weld Connections: Comply with AWS D1 1 for procedures, appearance and quality of welds, and methods used in correcting welding work. 1 Comply with AISC specifications referenced in this Section for bearing, adequacy of temporary connections, alignment, and removal of paint on surfaces adjacent to field welds. 2. Assemble and weld built -up sections by methods that will maintain true alignment of axes without warp. 3 Verify that weld sizes, fabrication sequence, and equipment used for architecturally exposed structural steel will limit distortions to allowable tolerances. Prevent surface bleeding of back -side welding on exposed steel surfaces. Grind smooth exposed fillet welds 1/2 inch and larger Grind flush butt welds. Dress exposed welds. 3.6 FIELD QUALITY CONTROL A. Owner will engage an independent testing and inspecting agency to perform field inspections and tests and to prepare test reports. 1. Testing agency will conduct and interpret tests and state in each report whether tested Work complies with or deviates from requirements. B. Correct deficiencies in or remove and replace structural steel that inspections and test reports indicate do not comply with specified requirements. C. Additional testing, at Contractor's expense, will be performed to determine compliance of corrected Work with specified requirements. D Field bolted connections will be tested and inspected according to RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts." E. In addition to visual inspection, field welded connections will be inspected and tested according to AWS D1 1 and the inspection procedures listed below at testing agency's option. 1 Liquid Penetrant Inspection: ASTM E 165 2. Magnetic Particle Inspection. ASTM E 709• performed on root pass and on finished weld. Cracks or zones of incomplete fusion or penetration will not be accepted. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3 Radiographic Inspection. ASTM E 94 and ASTM E 142, minimum quality level "2 2T" 4 Ultrasonic Inspection. ASTM E 164 3.7 CLEANING A. Touchup Painting Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint. Apply paint to exposed areas using same material as used for shop painting. 1 Apply by brush or spray to provide a minimum dry film thickness of 1.5 mils. B. Touchup Painting: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on structural steel are included in Division 9 Section "Painting." C. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and apply galvanizing repair paint according to ASTM A 780 0 1997 Malilmn Nordfors McKinley Gordon SECTION 05120 PAGE 7 STRUCTURAL STEEL END OF SECTION 05120 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This Section includes the following: 1. Open -web steel joists. 2. Joist accessories. 1.3 PERFORMANCE REQUIREMENTS SECTION 05210 PAGE 1 STEEL JOISTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. Related Sections: The following Sections contain requirements that relate to this Section: 1 Division 5 Section "Structural Steel" for field quality- control procedures and tests. 2. Division 5 Section "Metal Fabrications" for loose, steel bearing plates and miscellaneous steel framing. 3 Division 9 Section "Painting" for surface preparation and prime painting. A. Structural Performance: Engineer, fabricate, and erect joists and connections to withstand design loads within limits and under conditions required. 1 Design Loads: As indicated. 2. Design joists to withstand design loads without deflections greater than the following: a. Roof Joists: Vertical deflection of 1/240 of the span for total load and 1/360 for live Load. B. Engineering Responsibility Engage a joist manufacturer who utilizes a qualified professional engineer to prepare design calculations, shop drawings, and other structural data for steel joists. 1.4 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for each type of joist, accessory and product specified. C. Shop Drawings showing layout, mark, number, type, location, and spacings of joists. Include joining and anchorage details, bracing, bridging, accessories, splice and connection details, and attachments to other units of Work. 1. Indicate locations and details of anchorage devices and bearing plates to be embedded in other construction. 2. For joists indicated to comply with certain design loadings, include structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation. D Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project MAHLUM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05210 PAGE 2 STEEL JOISTS names and addresses, names and addresses of architects and owners, and other information specified. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: Engage a firm experienced in manufacturing joists similar to those indicated for this Project and that have a record of successful in- service performance. 1 Manufacturer must be certified by SJI to manufacture joists conforming to SJI standard specifications and load tables. B. SJI Design Standard: Comply with recommendations of SJI's "Standard Specifications Load Tables and Weight Tables for Steel Joists and Joist Girders," applicable to types of joists indicated. C. Welding Standards: Comply with applicable provisions of AWS D1 1 "Structural Welding Code—Steel" and AWS D1.3 "Structural Welding Code—Sheet Steel." 1 Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle joists as recommended in SDI's "Specifications." B. Protect joists from corrosion, deformation, and other damage during delivery storage, and handling. 1.7 SEQUENCING A. Deliver steel bearing plates and other devices to be built into concrete and masonry construction. PART 2- PRODUCTS 2.1 MATERIALS A. Steel. Comply with requirements of SJI's "Specifications" for chord and web section material. B. Steel Bearing Plates: ASTM A 36 C. Carbon -Steel Bolts and Threaded Fasteners: ASTM A 307 Grade A, carbon- steel, hex -head bolts and threaded fasteners; carbon -steel nuts; and flat, unhardened steel washers. 1 Finish. Plain, noncoated. D Welding Electrodes: Comply with AWS standards. 2.2 PRIMERS A. Primer SSPC Paint 15 Type I, red oxide; Federal Specification TT- P-636, red oxide; or manufacturer's standard shop primer meeting the performance requirements of either of these red -oxide primers. 2.3 STEEL JOISTS A. Manufacture joists according to SDI's "Specifications," with steel angle top and bottom chord members, of joist types, end arrangements, and top chord arrangements indicated. MAHLUM NORDFORS McIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05210 PAGE 3 STEEL JOISTS B. Comply with AWS requirements and procedures for shop welding, appearance, quality of welds, and methods used in correcting welding work. C. Provide holes in chord members where shown for securing other work to steel joists. D Extend top chords of joists with SJI Type S top chord extensions where indicated, complying with SJI's "Specifications" and load tables. E. Extend bearing ends of joists with SJI Type R extended ends where indicated, complying with SJI's "Specifications" and load tables. F Camber K -series steel joists according to SJI's "Specifications." G. Equip bearing ends of joists with manufacturer's standard beveled ends or sloped shoes when joist slope exceeds 1/4 inch in 12 inches. 2.4 JOIST ACCESSORIES A. Bridging: Provide bridging anchors and number of rows of horizontal or diagonal bridging of material, size, and type required by SJI's "Specifications" for type of joist, chord size, spacing, and span. B. Fabricate steel bearing plates with integral anchorages as indicated. C. Steel bearing plates with integral anchorages are specified in Division 5 Section "Metal Fabrications." D Supply ceiling extensions, either extended bottom chord elements or a separate extension unit of sufficient strength to support ceiling construction. Extend ends to within 1/2 inch of finished wall surface, unless otherwise indicated. E. Supply miscellaneous accessories, including splice plates and bolts required by the joist manufacturer to complete the joist installation. PART 3 EXECUTION 3.1 EXAMINATION A. Examine supporting substrates, embedded bearing plates, and abutting structural framing, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of joists. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Do not install joists until supporting construction is in place and secured. B. Install joists and accessories plumb, square, and true to line; securely fasten to supporting construction according to SJI's "Specifications," joist manufacturer's recommendations, and the requirements of this Section. 1. Space, adjust, and align joists accurately in location before permanently fastening. 2. Install temporary bracing and bridging, connections, and anchors to ensure joists are stabilized during construction. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.3 FIELD QUALITY CONTROL 3.4 REPAIRS AND PROTECTION 0 1997 Mahlum Nordfors McKinley Gordon SECTION 05210 PAGE 4 STEEL JOISTS C. Field weld joists to supporting steel framework and steel bearing plates. Coordinate welding sequence and procedure with placing of joists. 1. Comply with AWS requirements and procedures for welding, appearance and quality of welds, and methods used in correcting welding work. D Bolt joists to supporting steel framework using carbon -steel bolts, unless otherwise indicated. E. Install and connect bridging concurrently with joist erection, before construction loads are applied. Anchor ends of bridging lines at top and bottom chords where terminating at walls or beams A. Testing Agency A qualified independent testing agency employed and paid by Owner will perform field quality- control testing. B. Testing agency will report test results promptly and in writing to Contractor and Architect. C. Correct deficiencies in Work that inspections and test reports have indicated are not in compliance with specified requirements. D Additional testing will be performed to determine compliance of corrected Work with specified requirements. A. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer, that ensure that joists and accessories are without damage or deterioration at the time of Substantial Completion. END OF SECTION 05210 PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This Section includes the following: 1 Steel roof deck. 2. Composite steel floor deck. 1.3 SUBMITTALS MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 05310 PAGE 1 STEEL DECK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 3 Section "Cast -in -Place Concrete" for concrete fill and reinforcing steel. 2. Division 5 Section "Structural Steel" for shop welded shear connectors. 3 Division 5 Section "Metal Fabrications" for framing openings with miscellaneous steel shapes. 4 Division 9 Section "Painting" for touchup and repair painting of deck. A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product data for each type of deck, accessory and product specified. C. Shop drawings showing layout and types of deck panels, anchorage details, reinforcing channels, pans, deck openings, special jointing, accessories, and attachments to other construction. 1 For steel deck indicated to comply with certain design loadings, include structural analysis data sealed and signed by the qualified professional engineer who was responsible for its preparation. D Product certificates signed by manufacturers of steel deck certifying that their products comply with specified requirements. E. Welder certificates signed by Contractor certifying that welders comply with requirements specified under the "Quality Assurance" Article. F Research reports or evaluation reports of the model code organization acceptable to authorities having jurisdiction that evidence steel deck's compliance with the building code in effect for the Project. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed steel deck similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance. B. Testing Agency Qualifications: To qualify for acceptance, an independent testing agency must demonstrate to Architect's satisfaction, based on evaluation of agency submitted criteria MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS C. Welding Standards: Comply with applicable provisions of AWS D1.1 "Structural Welding Code Steel" and AWS D1.3 "Structural Welding Code —Sheet Steel." 1. ..Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. D Fire -Test Response Characteristics: Where indicated, provide steel deck panels identical to those tested as part of an assembly for fire resistance per ASTM E 119 by a testing and inspection agency performing testing and follow -up services. that is acceptable to authorities having jurisdiction. 1 Fire Resistance Ratings: As indicated by design designations listed in UL `Fire Resistance Directory 2. Labeling: Identify steel deck with appropriate markings of applicable testing and inspecting agency E. FM Listing: Provide steel roof deck evaluated by Factory Mutual and listed in Factory Mutual "Approval Guide" for Class 1 fire rating and Class 1-60 windstorm ratings. F Engineer Qualifications: A professional engineer legally authorized to practice in the jurisdiction where Project is located and experienced in providing engineering services of the kind indicated that have resulted in the installation of steel deck similar to this Project in material, design, and extent and that have a record of successful in -service performance. 1.5 DELIVERY, STORAGE, AND HANDLING A. Protect steel deck from corrosion, deformation, and other damage during delivery storage, and handling. B. Stack steel deck on platforms or pallets and slope to provide drainage. Protect with a waterproof covering and ventilate to avoid condensation. PART 2- PRODIJCTS SECTION 05310 PAGE 2 STEEL DECK conforming to ASTM E 699 that it has the experience and capability to satisfactorily conduct the testing indicated without delaying the Work. 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1 American Buildings Co. 2. ASC Pacific Inc. 3 Bowman Metal Deck Armco, Inc. 4 Consolidated Systems, Inc. 5 Epic Metals Corp. 6 Marlyn Steel Products, Inc. 7 Robertson A United Dominion Co. 8. Roof Deck, Inc. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 9 United Steel Deck, Inc. 10 Verco Manufacturing Co. 11. Vulcraft Div of Nucor Corp. 12. Walker Div of Butler Manufacturing Co. 13 Wheeling Corrugating Co. Div of Wheeling- Pittsburgh Steel Corp. 2.2 ROOF DECK 2.3 FLOOR DECK 2.5 ACCESSORIES SECTION 05310 PAGE 3 STEEL DECK A. Steel Roof Deck: Fabricate panels without top -flange stiffening grooves conforming to SDI Publication No. 28 "Specifications and Commentary for Steel Roof Deck" and the following: 1 Galvanized -Steel Sheet: As indicated in Structural Drawings. 2. Deck Profile: As indicated in Structural Drawings. 3 Profile Depth. As indicated in Structural Drawings. 4 Design Uncoated -Steel Thickness: As indicated in Structural Drawings. 5 Span Condition. As indicated in Structural Drawings. 6. Side Joints: As indicated in Structural Drawings. A. Composite Steel Floor Deck: Fabricate panels with integrally embossed or raised pattern ribs and interlocking side laps, conforming to SDI Publication No. 28 "Specifications and Commentary for Composite Steel Floor Deck," the minimum section properties indicated, and the following: 1 Galvanized -Steel Sheet: As indicated in Structural Drawings. 2. Profile Depth. As indicated in Structural Drawings. 3 Design Uncoated -Steel Thickness: As indicated in Structural Drawings. 4 Span Condition. As indicated in Structural Drawings. A. General. Provide accessory materials for steel deck that comply with requirements indicated and recommendations of the steel deck manufacturer B. Rib Closure Strips: Manufacturer's standard vulcanized, closed -cell, synthetic rubber C. Miscellaneous Roof Deck Accessories: Steel sheet, 0 0359 -inch- (0.91 -mm thick minimum ridge and valley plates, finish strips, and reinforcing channels, of same material as roof deck. D Pour Stops and Girder Fillers: Steel sheet, of same material as deck panels, and of thickness and profile indicated. E. Column Closures, End Closures, Z- Closures, and Cover Plates: Steel sheet, of same material and thickness as deck panels, unless otherwise indicated. F Hanger Tabs: Manufacturer's standard piercing steel sheet hanger attachment devices for floor deck panels. G. Recessed Sump Pans: Manufacturer's standard size, single piece steel sheet 0 071 -inch- (1.8- mm-) thick minimum, of same material as deck panels, with 1 -1/2 -inch- (38 -min minimum deep level recessed pans and 3 -inch- (76 -mm wide flanges. Cut holes for drains in the field. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 05310 PAGE 4 STEEL DECK H. Flat Receiver Pan. Manufacturer's standard size, single -piece steel sheet, 0.071 -inch- (1.8- mm thick minimum units, of same material as deck panels. Cut holes for drains in the field. I. Shear Connectors: ASTM A 108, Grade 1010 through 1020 headed stud type, cold- finished carbon steel, AWS D1.1, Type B. J Steel *Sheet Accessories: ASTM A 446, G 60 (ASTM A 446M, Z 180) coating class, galvanized according to ASTM A 525 (ASTM A 525M). K. Galvanizing Repair Paint: SSPC-Paint 20 or DOD-P-21035, with dry film containing a minimum of 94 percent zinc dust by weight. PART 3- EXECUTION 3.1 EXAMINATION A. Examine supporting framing and field conditions for compliance with requirements for installation tolerances and other conditions affecting performance of steel deck. 3.2 PREPARATION A. Do not place deck panels on concrete supporting structure until concrete has cured and is dry B. Locate decking bundles to prevent overloading of supporting members. 3.3 INSTALLATION, GENERAL A. Install deck panels and accessories according to applicable specifications and commentary of SDI Publication No. 28, manufacturer's recommendations, and requirements of this Section. B. Install temporary shoring before placing deck panels when required to meet deflection limitations. C. Place deck panels on supporting framing and adjust to final position with ends accurately aligned and bearing on supporting framing before being permanently fastened. Do not stretch or contract side lap interlocks. D Place deck panels flat and square and fasten to supporting framing without warp or deflection. E. Cut and neatly fit deck panels and accessories around openings and other work projecting through or adjacent to the decking. F Provide additional reinforcement and closure pieces at openings as required for strength, continuity of decking, and support of other work. G. Comply with AWS requirements and procedures for manual shielded metal arc welding, appearance and quality of welds, and methods used in correcting welding work. H. Mechanical fasteners may be used in lieu of welding to fasten deck. Locate mechanical fasteners and install according to deck manufacturer's instructions. 3.4 ROOF DECK INSTALLATION A. Fasten roof deck panels to steel supporting members by arc spot (puddle) welds of the surface diameter indicated or arc seam welds with an equal perimeter, but not less than 1 1/2 inches (38 mm) long, and as follows: MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDTTIONS ALTERATIONS 1 Weld Diameter As indicated in Structural Drawings. 2. Weld Spacing: As indicated in Structural Drawings. 3 Weld Washers: Install weld washers at each weld location. B. Side Lap and Perimeter Edge Fastening: As indicated in Structural Drawings. SECTION 05310 PAGE 5 STEEL DECK C. End Bearing: Install deck ends over supporting framing with a minimum end bearing of 1 -1/2 inches (38 nun), with end joints as follows: 1 End Joints: Lapped 2 inches (51 mm) minimum or butted at Contractor's option. D Roof Sump Pans and Sump Plates: Install over openings provided in roof decking, and weld flanges to top of deck. Space welds not more than 12 inches (305 nun) apart with at least one weld at each corner E. Miscellaneous Roof Deck Accessories: Install ridge and valley plates, finish strips, cover plates, end closures, and reinforcing channels according to deck manufacturer's recommendations. Weld to substrate to provide a complete deck installation. F Flexible Closure Strips: Install flexible closure strips over partitions, walls, and where indicated. Install with adhesive according to manufacturer's instructions to ensure complete closure. 3.5 FLOOR DECK INSTALLATION A. Fasten floor deck panels to steel supporting members by arc spot (puddle) welds of the surface diameter indicated and as follows: 1. Weld Diameter As indicated in Structural Drawings. 2. Weld Spacing: As indicated in Structural Drawings. 3 Weld Washers: Install weld washers at each weld location. B. Side Lap and Perimeter Edge Fastening: As indicated in Structural Drawings. C. End Bearing: Install deck ends over supporting framing with a minimum end bearing of 1 -1/2 inches (38 nun), with end joints as follows: 1 End Joints: Lapped or butted at Contractor's option. D Shear Connectors: Weld shear connectors through deck to support framing according to AWS D1 1 and manufacturer's instructions. Butt end joints of deck panels; do not overlap. E. Pour Stops and Girder Fillers: Weld steel sheet pour stops and girder fillers to supporting structure according to SDI recommendations, unless otherwise indicated. F Floor Deck Closures: Weld steel sheet column closures, cell closures, and Z -closures to deck according to SDI recommendations to provide tight -fitting closures at open ends of ribs and sides of decking. Weld cover plates at changes in direction of floor deck panels, unless otherwise indicated. H. Install piercing hanger tabs not more than 14 inches (355 mm) apart in both directions, within 9 inches (228 mm) of walls at ends, and not more than 12 inches (305 mm) from walls at sides, unless otherwise indicated. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.6 FIELD QUALITY CONTROL SECTION 05310 PAGE 6 STEEL DECK A. Testing Agency A qualified independent testing agency employed and paid by Owner will perform field quality- control testing. B. Field welds will be subject to inspection. C. Shear connector welds will be inspected and tested according to the requirements of AWS D1 1 for stud welding and as follows: 1 Shear connector welds will be visually inspected. 2. Bend tests will be performed when visual inspections reveal either less than a continuous 360 degree flash or welding repairs to any shear connector. 3 Tests will be conducted on additional shear connectors when weld fracture occurs on shear connectors already tested, according to the requirements of AWS D1 1 D Testing agency will report test results promptly and in writing to Contractor and Architect. E. Remove and replace work that does not comply with specified requirements. F Additional testing will be performed to determine compliance of corrected work with specified requirements. 3.7 REPAIRS AND PROTECTION A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on both surfaces with galvanized repair paint according to ASTM A 780 and the manufacturer's instructions. B. Touchup Painting: Wire brush, clean, and paint scarred areas, welds, and rust spots on both surfaces of installed deck panels. 1 Touch up painted surfaces with same type of shop paint used on adjacent surfaces. 2. Where shop painted surfaces are exposed in- service, apply touchup paint to blend into adjacent surfaces. C. Touchup Painting: Cleaning and touchup painting of field welds, abraded areas, and rust spots, as required after erection and before proceeding with field painting, are included in Division 9 Section "Painting." D Provide final protection and maintain conditions to ensure steel decking is without damage or deterioration at time of Substantial Completion. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 05310 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Exterior load- bearing steel -stud walls. 2. Exterior nonload- bearing steel -stud exterior wall. 3 Steel joists. 4 Exterior sheathing and air infiltration barriers. 1.3 PERFORMANCE REQUIREMENTS SECTION 05400 PAGE 1 COLD FORMED METAL FRAMING B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 5 Section "Metal Fabrications" for masonry shelf angles and connections. 2. Division 9 Section "Gypsum Board Assemblies" for gypsum board and nonload- bearing metal -stud flaming and ceiling suspension assemblies. 3 Division 9 Section "Gypsum Sheathing" for gypsum sheathing applied to exterior steel framing. 4 Division 9 Section "Gypsum Board Shaft -Wall Assemblies" for gypsum board and nonload- bearing metal -stud flaming assemblies. A. AISI Specifications" Calculate structural characteristics of cold- formed metal framing according to AISI's "Specification for the Design of Cold- Formed Steel Structural Members" B. Structural Performance: Engineer, fabricate and erect cold formed metal framing with the following minimum physical and structural properties: 1 Physical and Structural Properties: As indicated. C. Structural Performance: Engineer, fabricate, and erect cold- formed metal framing to withstand design loads within limits and under conditions required. 1 Design Loads: As indicated. 2. Design framing systems to withstand design loads without deflections greater than the following: a. Exterior Load- Bearing Walls: Lateral deflection of 1/360 of the wall height. b. Exterior Nonload- Bearing Exterior wall. Lateral deflection of 1/360 of the wall height. c. Roof Joists: Vertical deflection of 1/360 of the span. 3 Design framing systems to provide for movement of framing members without damage or overstressing, sheathing failure, connection failure, undue strain on fasteners and anchors, or other detrimental effects when subject to a maximum ambient temperature change (range) of 120 deg F (67 deg C). MAHLUM NORDFORS MclUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05400 PAGE 2 COLD FORMED METAL FRAMING 4 Design framing system to accommodate deflection of primary building structure and construction tolerances, and to maintain clearances at openings. E. Design exterior nonload- bearing exterior wall framing to accommodate lateral deflection without regard to contribution of sheathing materials. F Engineering Responsibility Engage a fabricator who assumes undivided responsibility for engineering cold- formed metal framing by employing a qualified professional engineer to prepare design calculations, shop drawings, and other structural data 1.4 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product data for each type of cold- formed metal framing, accessory and product specified. C. Shop drawings showing layout, spacings, sizes, thicknesses, and types of cold- formed metal framing, fabrication, fastening and anchorage details, including mechanical fasteners. Show reinforcing channels, opening framing, supplemental framing, strapping, bracing, bridging, splices, accessories, connection details, and attachments to other units of Work. 1 For cold- formed metal framing indicated to comply with certain design loadings, include structural analysis data sealed and signed by the qualified professional engineer who was responsible for its preparation. D Welder certificates signed by Contractor certifying that welders comply with requirements specified under the "Quality Assurance" Article. E. Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. F Product test reports from a qualified independent testing agency evidencing compliance with requirements of the following based on comprehensive testing: 1. Expansion anchors. 2. Mechanical fasteners. G. Research reports or evaluation reports of the model code organization acceptable to authorities having jurisdiction that evidence cold- formed metal framing's compliance with building code in effect for Project. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed cold formed metal framing similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance. B. Testing Agency Qualifications: To qualify for acceptance, an independent testing agency must demonstrate to Architect's satisfaction, based on evaluation of agency- submitted criteria conforming to ASTM E 699 that it has the experience and capability to satisfactorily conduct the testing indicated without delaying the Work. C. Welding Standards: Comply with applicable provisions of AWS D1 1 "Structural Welding Code Steel" and AWS D1.3 "Structural Welding Code—Sheet Steel." MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Fire- Test Response Characteristics: Where fire- resistance-rated assemblies are indicated, provide cold- formed metal framing identical to that tested as part of an assembly for fire resistance per ASTM E 119 by an independent testing and inspecting agency acceptable to authorities having jurisdiction. 1 Fire Resistance Ratings: As indicated by design designations listed in UL "Fire Resistance Directory or by Warnock Hersey or another testing and inspecting agency acceptable to authorities having jurisdiction. E. Professional Engineer Qualifications: A professional engineer legally authorized to practice structural engineering in the jurisdiction where Project is located and experienced in providing engineering services of the kind indicated that have resulted in the installation of cold- formed metal framing similar to this Project in material, design, and extent and that have a record of successful in -service performance. F Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings." 1.6 DELIVERY STORAGE, AND HANDLING A. Protect cold- formed metal framing from corrosion, deformation, and other damage during delivery storage, and handling. B. Store cold formed metal framing, protect with a waterproof covering, and ventilate to avoid condensation. PART 2 PRODUCTS SECTION 05400 PAGE 3 COLD FORMED METAL FRAMING 1 Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide cold- formed metal framing by one of the following: 1 Alabama Metal Industries Corp. 2. American Studco, Inc. 3 Angeles Metal Systems. 4 California Metal Systems, Inc. 5 Clark Cincinnati, Inc. 6. Consolidated Fabricators Corp. 7 Consolidated Systems, Inc. 8. Dale/Incor Industries of Florida. 9 Dale Industries, Inc. 10 Design Shapes in Steel. 11 Dietrich Industries, Inc. 12. Incor Plant Dale Industries. 13 Knorr Steel Framing Systems. 14 MarinoWare; Div of Ware Industries, Inc. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 15 Studco of Hawaii, Inc. 16. Super Stud Building Products, Inc. 17 Unimast, Inc. 18. United Construction Supply 19 ''United States Steel. 20 Western Metal Lath Co. 2.2 MATERIALS 2.3 WALL FRAMING 2.4 JOIST FRAMING SECTION 05400 PAGE 4 COLD FORMED METAL FRAMING A. Galvanized -Steel Sheet: ASTM A 446 (ASTM A 446M), zinc coated according to ASTM A 525 (ASTM A 525M), and as follows: 1 Coating Designation. G 60 (Z 180). 2. Grade: Grade A, 33,000 psi (230 MPa) minimum yield strength, 20 percent elongation. 3 Grade: Grade D 50,000 psi (345 MPa) minimum yield strength, 12 percent elongation. A. Steel Studs: Manufacturer's standard C- shaped steel studs of web depths indicated, with lipped flanges, and complying with the following: 1 Design Uncoated -Steel Thickness: 0 0358 inch (0.91 min). 2. Design Uncoated -Steel Thickness: 0 0474 inch (1.20 mm) 3 Design Uncoated -Steel Thickness: 0 0747 inch (1.90 min) 4 Flange Width. 1 -3/8 inches (35 nun) 5 Flange Width. 1 -5/8 inches (41 mm). 6 Flange Width. 2 inches (51 mm). 7 Web Punched. 8. Web Unpunched. B. Steel Track: Manufacturer's standard U- shaped steel track, unpunched, of web depths indicated, with straight flanges, and complying with the following: 1 Design Uncoated -Steel Thickness: 0.0358 inch (0.91 mm). 2. Design Uncoated -Steel Thickness: 0 0598 inch (1.52 mm). 3 Flange Width. Manufacturers standard deep flange where indicated, standard flange elsewhere. A. Steel Joists: Manufacturer's standard C- shaped steel joists, unpunched, of web depths indicated, with lipped flanges, and complying with the following: 1 Design Uncoated -Steel Thickness: 0 0747 inch (1.90 mm). 2. Flange Width. 3 -1/2 inches. B. Steel Joist Track: Manufacturer's standard U- shaped steel joist track, unpunched, of web depths indicated, with straight flanges, and complying with the following: 1 Design Uncoated -Steel Thickness: 0 0358 inch. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2. Design Uncoated -Steel Thickness: 0 0598 inch. 3 Flange Width. 1 -1/2 inches minimum. 2.5 FRAMING ACCESSORIES SECTION 05400 PAGE 5 COLD FORMED METAL FRAMING A. Fabricate steel- framing accessories of the same material and finish used for framing members, with a minimum yield strength of 33,000 psi (230 MPa). B. Provide accessories of manufacturer's standard thickness and configuration, unless otherwise indicated, as follows: 1 Supplementary framing 2. Bracing, bridging, and solid blocking. 3 Web stiffeners. 4 Gusset plates. 5 Deflection track and vertical slide clips. 6 Stud kickers and girts. 7 Joist hangers and end closures. 8. Reinforcement plates. 2.6 ANCHORS, CLIPS, AND FASTENERS A. Steel Shapes and Clips: ASTM A 36 (ASTM A 36M), zinc coated by the hot -dip process according to ASTM A 123 B. Cast -in -Place Anchor Bolts and Studs: ASTM A 307 Grade A (ASTM F 568, Property Class 4 6); carbon -steel hex -head bolts and studs; carbon -steel nuts; and flat, unhardened -steel washers. Zinc coated by the hot -dip process according to ASTM A 153 C. Expansion Anchors: Fabricated from corrosion resistant materials, with capability to sustain, without failure, a load equal to 5 times the design load, as determined by testing per ASTM E 488 conducted by a qualified independent testing agency D Mechanical Fasteners: Corrosion resistant coated, self drilling, self threading steel drill screws. 1 Head Type: Low- profile head beneath sheathing, manufacturer's standard elsewhere. E. Welding Electrodes: Comply with AWS standards. 2.7 MISCELLANEOUS MATERIALS A. Galvanizing Repair Paint: SSPC -Paint 20 or DOD -P -21035 with dry film containing a minimum of 94 percent zinc dust by weight. B. Cement Grout: Portland cement, ASTM C 150 Type I, and clean, natural sand, ASTM C 404 Mix at ratio of 1 part cement to 2 -1/2 parts sand, by volume, with minimum water required for placement and hydration. C. Nonmetallic, Nonshrink Grout: Premixed, nonmetallic, noncorrosive, nonstaining grout containing selected silica sands, portland cement, shrinkage compensating agents, plasticizing and water reducing agents, complying with ASTM C 1107 with fluid consistency and a 30- minute working time. MAHLUM NORDFORS MCKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS D Thermal Insulation. ASTM C 665 Type I, unfaced mineral -fiber blankets produced by combining glass or slag fibers with thermosetting resins. 2.11 FABRICATION A. Fabricate cold- formed metal framing and accessories plumb, square, true to line, and with connections securely fastened, according to manufacturer's recommendations and the requirements of this Section. 1 Fabricate framing assemblies in jig templates. 2. Cut framing members by sawing or shearing; do not torch cut. 3 Fasten cold formed metal framing members by welding. Wire tying of framing members is not permitted. 4 Fasten cold- formed metal framing members by welding or screw fastening, as standard with fabricator Wire tying of framing members is not permitted. a. Comply with AWS requirements and procedures for welding, appearance and quality of welds, and methods used in correcting welding work. b. Locate mechanical fasteners and install according to cold- framed metal framing manufacturer's instructions with screw penetrating joined members by not less than 3 exposed screw threads. 5 Fasten other materials to cold- formed metal framing by welding, bolting, or screw fastening, according to manufacturer's recommendations. B. Reinforce, stiffen, and brace framing assemblies to withstand handling, delivery and erection stresses. Lift fabricated assemblies to prevent damage or distortion. C. Fabrication Tolerances: Fabricate assemblies to a maximum allowable tolerance variation from plumb, level, and true to line of 1/8 inch in 10 feet (1 and as follows: 1 Spacing: Space individual flaming members no more than plus or minus 1/8 inch (3 min) from plan location. Cumulative error shall not exceed minimum fastening requirements of sheathing or other finishing materials. 2. Squareness: Fabricate each cold formed metal framing assembly to a maximum out -of- square tolerance of 1/8 inch (3 mm). PART 3- EXECUTION 3.1 EXAMINATION A. Examine supporting substrates and abutting structural framing for compliance with requirements, including installation tolerances and other conditions affecting performance of cold- formed metal framing. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 PREPARATION SECTION 05400 PAGE 6 COLD FORMED METAL FRAMING A. Before sprayed -on fireproofing is applied, attach continuous angles, supplementary framing, or tracks to structural members indicated to receive sprayed -on fireproofing. B. After sprayed -on fireproofing has been applied, remove only as much fireproofing as needed to complete installation of cold formed framing without reducing thickness of fireproofing below that required to obtain fire- resistance rating indicated. Protect remaining fireproofing from damage. MAHLUM NORDFORS McIC1NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 LOAD- BEARING WALL INSTALLATION SECTION 05400 PAGE 7 COLD FORMED METAL FRAMING C. Grout bearing surfaces uniform and level to ensure full contact of bearing flanges or track webs on supporting concrete or masonry construction. 3.3 INSTALLATION, GENERAL A. Cold- formed metal framing may be shop or field fabricated for installation, or it may be field assembled. B. Install cold- formed metal framing and accessories plumb, square, true to line, and with connections securely fastened, according to manufacturer's recommendations and the requirements of this Section. 1 Cut framing members by sawing or shearing; do not torch cut. 2. Fasten cold- formed metal framing members by welding or screw fastening, as standard with fabricator Wire tying of framing members is not permitted. a. Comply with AWS requirements and procedures for welding, appearance and quality of welds, and methods used in correcting welding work. b. Locate mechanical fasteners and install according to cold- framed metal framing manufacturer's instructions with screw penetrating joined members by not less than 3 exposed screw threads. C. Install framing members in one -piece lengths, unless splice connections are indicated for track or tension members. D Provide temporary bracing and leave in place until framing is permanently stabilized. E. Do not bridge building expansion and control joints with cold- formed metal framing. Independently frame both sides of joints. F Install insulation in built -up exterior framing members, such as headers, sills, boxed joists, and double studs, inaccessible upon completion of framing work. G. Fasten reinforcement plate over web penetrations that exceed size of manufacturer's standard punched openings. H. Erection Tolerances: Install cold formed metal framing to a maximum allowable tolerance variation from plumb, level, and true to line of 1/8 inch in 10 feet (1:960) and as follows: 1 Space individual framing members no more than plus or minus 1/8 inch (3 mm) from plan location. Cumulative error shall not exceed minimum fastening requirements of sheathing or other finishing materials. A. Install continuous top and bottom tracks sized to match studs. Align tracks accurately and securely anchor at corners and ends, and at spacings recommended by the manufacturer, but not greater than the following: 1 Spacing: 32 inches for cast -in -place or expansion anchors. B. Squarely seat studs against webs of top and bottom tracks. Fasten both flanges of studs to top and bottom track. Space studs as follows: 1 Stud Spacing: As indicated. C. Set studs plumb, except as needed for diagonal bracing or required for nonplumb walls or warped surfaces and similar requirements. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADD1fIONS ALTERATIONS SECTION 05400 PAGE 8 COLD FORMED METAL FRAMING D Align studs vertically where wall- framing continuity is interrupted by floor framing Where studs cannot be aligned, continuously reinforce track to transfer loads. E. Align joists over studs. Where joists cannot be aligned, continuously reinforce track to transfer loads. F Anchor studs abutting structural columns or walls, including masonry walls, to supporting structure as indicated. G. Install headers over wall openings wider than the stud spacing. Locate headers above openings as indicated. Fabricate headers of compound shapes indicated or required to transfer load to supporting studs, complete with clip -angle connectors, web stiffeners, or gusset plates. 1. Frame wall openings with not less than a double stud at each jamb of frame as indicated or required by manufacturer. 2. Install runner tracks and jack studs above and below wall openings. Anchor tracks to jamb studs with clip angles or by welding, and space jack studs same as full- height wall studs. H. Install supplementary framing, blocking, and bracing in stud framing indicated to support fixtures, equipment, services, casework, heavy trim, furnishings, and similar work requiring attachment to framing. 1. Where type of supplementary support is not indicated, comply with stud manufacturer's recommendations and industry standards in each case, considering weight or load resulting from item supported. Install horizontal bridging in stud system, spaced in rows not more than 48 inches (1219 mm) apart. Fasten at each stud intersection. 1 Bridging: Cold rolled steel channel, clip angle fastened to webs of punched studs. 2. Bridging: Flat, steel -sheet straps of width and thickness indicated, fastened to stud flanges. 3 Bridging: Combination of flat, steel -sheet straps of width and thickness indicated and stud -track solid blocking of width and thickness matching studs. Fasten flat straps to stud flanges and secure solid blocking to stud webs or flanges. J Install steel -sheet diagonal bracing straps to both stud flanges, terminate at and fasten to reinforced top and bottom track. Fasten clip -angle connectors to multiple studs at ends of bracing and anchor to structure. K. Install miscellaneous framing and connections, including supplementary framing, web stiffeners, clip angles, continuous angles, anchors, and fasteners, to provide a complete and stable wall- framing system. 3.5 NONLOAD BEARING EXTERIOR WALL INSTALLATION A. Install continuous tracks sized to match studs. Align tracks accurately and securely anchor to supporting structure as indicated. B. Squarely seat studs against webs of top and bottom tracks. Fasten both flanges of studs to top and bottom track, unless otherwise indicated. Space studs as follows: 1 Stud Spacing: As indicated. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05400 PAGE 9 COLD FORMED METAL FRAMING C. Set studs plumb, except as needed for diagonal bracing or required for nonplumb walls or warped surfaces and similar requirements. D Isolate steel framing from building structure at locations indicated to prevent transfer of vertical loads while providing lateral support. d Install deflection track and anchor to building structure. 2. Connect studs with vertical slide clips to continuous angles or supplementary framing anchored to building structure. E. Install horizontal bridging in exterior wall studs, spaced in rows not more than 48 inches (1219 mm) apart. Fasten at each stud intersection. 1 Install additional row of horizontal bridging in exterior wall stud beneath deflection track when exterior wall studs are not fastened to an additional top track. 2. Bridging: Cold -rolled steel channel, clip angle fastened to webs of punched studs. 3 Bridging: Flat, steel -sheet straps of width and thickness indicated, fastened to stud flanges. 4 Bridging: Combination of flat, steel -sheet straps of width and thickness indicated and stud -track solid blocking of width and thickness matching studs. Fasten flat straps to stud flanges and secure solid blocking to stud webs or flanges. F Install miscellaneous framing and connections, including stud kickers, web stiffeners, clip angles, continuous angles, anchors, fasteners, and stud girts, to provide a complete and stable exterior wall- framing system. 3.6 FABRICATED WALL PANEL INSTALLATION A. Install fabricated wall panels and securely anchor to supporting structure. B. Erection Tolerances: Bolt or weld wall panels at horizontal and vertical junctures to produce flush, even, true -to -line joints. 1 Maximum variation in plane and true position between prefabricated assemblies should not exceed 1/16 inch (1.6 nun). 3.7 JOIST INSTALLATION A. Install perimeter joist track sized to match joists. Align and securely anchor or fasten track to supporting structure at corners, ends, and spacings indicated or as recommended by the manufacturer. B. Install joists bearing on supporting framing, level, straight, and plumb, adjust to final position, brace, and reinforce. Fasten joists to both flanges of joist track. 1 Install joists over supporting framing with a minimum end bearing of 1 -1/2 inches (38 mm) 2. Reinforce ends of joists with web stiffeners, end clips, joist hangers, steel clip angles, steel -stud sections, or as otherwise recommended by manufacturer C. Space joists not more than 2 inches (51 mm) from abutting walls, and as follows: 1 Joist Spacing: As indicated. D Frame openings with built -up joist headers consisting of joist and joist track, nesting joists, or another combination of connected joists where indicated. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.12 FIELD QUALITY CONTROL 3.13 REPAIRS AND PROTECTION SECTION 05400 PAGE 10 COLD FORMED METAL FRAMING E. Install joist reinforcement at interior supports with single, short length of joist section located directly over interior support, with lapped joists of equal length to joist reinforcement, or by other method recommended by joist manufacturer 1. Install web stiffeners to transfer axial loads of walls above. F Install bridging at each end of joists and at intervals indicated. Fasten bridging at each joist intersection as follows: 1. Bridging: Cold -rolled steel channel, fastened to bottom flange of joists. 2. Bridging: Flat, steel -sheet straps of width and thickness indicated, fastened to bottom flange of joists. 3 Bridging: Combination of flat, steel -sheet straps of width and thickness indicated and joist -track solid blocking of width and thickness indicated. Fasten flat straps to bottom flange of joists and secure solid blocking to joist webs. G. Secure joists to load- bearing interior walls to prevent lateral movement of bottom flange H. Install miscellaneous joist framing and connections, including web stiffeners, closure pieces, clip angles, continuous angles, hold -down angles, anchors, and fasteners, to provide a complete and stable joist framing assembly A. Testing Agency A qualified independent testing agency employed and paid by Owner will perform field quality- control testing. B. Field and shop welds will be subject to inspection and testing. C. Testing agency will report test results promptly and in writing to Contractor and Architect. D Remove and replace Work that does not comply with specified requirements. E. Additional testing will be performed to determine compliance of corrected Work with specified requirements. A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed cold- formed metal framing with galvanizing repair paint according to ASTM A 780 and the manufacturer's instructions. B. Touchup Painting: Wire brush, clean, and paint scarred areas, welds, and rust spots on fabricated and installed prime painted, cold- formed metal framing. 1 Touchup painted surfaces with same type of shop paint used on adjacent surfaces. C. Protect gypsum sheathing that will be exposed to weather for more than one month as follows: 1. Protect cutouts, comers, and joints in the sheathing by filling with a flexible sealant or by applying tape recommended by sheathing manufacturer at the time sheathing is applied. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 0 1997 Mahlon Nordfors McKinley Gordon SECTION 05400 PAGE 11 COLD -FORMED METAL FRAMING D Provide final protection and maintain conditions in a manner acceptable to manufacturer and Installer to ensure that cold- formed metal framing is without damage or deterioration at the time of Substantial Completion. END OF SECTION 05400 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 05500 PAGE 1 METAL FABRICATIONS A. Drawings and general provisions of Contract, including General and Supplementary `Conditions and Division 1 Specification Sections, apply to work of this Section. 1.2 SUMMARY A. This section includes the following metal fabrications: 1 Loose bearing and leveling plates. 2. Loose steel lintels. 3 Miscellaneous flaming and supports for the following: a. Sliding doors. b. Applications where framing and supports are not specified in other sections. 4 Miscellaneous steel trim. 5 Shelf and relieving angles. 6 Pipe bollards. 7 Steel support members for counter tops. 8. Miscellaneous angle framing, loose lintels and other miscellaneous metal, including steel support members for counters, noted on the Drawings and steel members not otherwise shown on the Structural Drawings. 9 Elevator pit ladders. 10 Seismic joint support angles and plates (hot dip galvanized), at all floor wall, roof and site foundation wall seismic joint conditions. 11 Mechanical, electrical, fire sprinkler system galvanized steel at exterior Hangers, trapezes, imbeds, plates and dunnage at shafts, penthouse, roof, tower enclosures, etc. 12. Sleeves. 13 Support and anchorage components at masonry 14 MEP support and trapeze systems inclusive of Unistrut imbeds. 15 Miscellaneous steel support dunnage at fans. 16 Metal moulding at exterior walls of Short Stay 17 Seismic restraint systems at partitions, CMU walls, duct support trapeze systems. 18. Exterior guardrails and handrails. 19 Touch -up painting, after installation, of abraded primed steel, primed galvanized steel, and galvanized steel surfaces. 20 Refer to the Drawings for locations and extent of miscellaneous metal items, or provide as necessary to complete work mentioned above. B Items to be Furnished Only Furnish the following items for installation by the designated Sections: 1 Section 04200 Unit Masonry a. Loose steel lintels occurring in exterior and interior masonry walls. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS C. Related Work: The following items of work are not included in this Section and are specified under the designated Sections: 1. Section 05120, Structural Steel. a. All steel members shown on the Structural Drawings not otherwise noted to be furnished by other Sections of the Specifications. 2. Section 06100, Rough Carpentry- a. Bolts, anchors and other fastening devices required to secure wood members to other surfaces. 3 Section 09900, Painting: a. Finish field painting. 1.3 DEFINITIONS A. Definitions in ASTM E 985 for railing related terms apply to this section. 1.4 SYSTEM PERFORMANCE REQUIREMENTS A. Structural Performance: Design, engineer, fabricate, and install the following metal fabrications to withstand the following structural loads without exceeding the allowable design working stress of the materials involved, including anchors and connections. Apply each load to produce the maximum stress in each respective component of each metal fabrication. 1 Top Rail of Guardrail Systems: Capable of withstanding the following' loads applied as indicated. a. Concentrated load of 300 lbf applied at any point nonconcurrently vertically downward, or horizontally b. Uniform load of 100 lbf per linear ft. applied nonconcurrently vertically downward or horizontally c. Concentrated and uniform loads above need not be assumed to act concurrently 2. Handrails Not Serving as Top Rails: Capable of withstanding the following loads applied as indicated. a. Concentrated load of 200 lbf applied at any point nonconcurrently vertically downward or horizontally b. Uniform load of 50 lbf per linear foot applied nonconcurrently vertically downward or horizontally c. Concentrated and uniform loads above need not be assumed to act concurrently 3 Infill Area of Guardrail Systems: Capable of withstanding a horizontal concentrated load of 200 lbf applied to one sq. ft. at any point in the system including panels, intermediate rails balusters, or other elements composing the infill area. a. Above load need not be assumed to act concurrently with uniform horizontal loads on top rails of railing systems in determining stress on guard. 1.5 SUBMITTALS SECTION 05500 PAGE 2 METAL FABRICATIONS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for products used in miscellaneous metal fabrications, including paint products and grout. MAHLUM NORDFORS MCK7NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS C. Shop Drawings: 1 Submit Shop Drawings for each item or assembly specified. Shop Drawings shall accurately and clearly show in detail the construction, sizes, gauges, dimensions, method of assembly supports, and all other pertinent data and information required for checking. Where installed metal fabrications are indicated to comply with certain design loadings, include structural computations, material properties, and other information needed for structural analysis that has been signed and sealed by the qualified professional engineer who was responsible for their preparation. 3 Show miscellaneous metal items in related and dimensional position with elevations at a scale of 1/4 in. equals 1 ft. Control details and dimensions not governed by job conditions. Show all required field measurements. 4 Provide Setting Drawings and Templates for the location of miscellaneous metal items that are to be embedded in or anchored to concrete or masonry D Samples: Submit Samples of each of the following items: 1 Submit 3 sets of Samples of shop applied coating system and finish for stainless steel items. Sample finishes shall be on the specified alloy and thickness of metal required for the work on 12 in. lengths or 12 in. square of sheet or plate, showing the maximum range of variation in finish. Sample review by the Architect will be for finish and reflectivity Compliance with all other requirements is the exclusive responsibility of the manufacturer 2. Typical welded corner and butt joints. 3 Other specified items as requested. E. Welder certificates signed by Contractor certifying that welders comply with requirements specified under "Quality Assurance" article. F Certifications: Submit affidavit attesting that steel railings meet or exceed the design requirements specified herein, Code requirements and the regulatory agencies. Send additional copy to Owner 1.6 GUARANTEE/WARRANTY SECTION 05500 PAGE 3 METAL FABRICATIONS A. Attention is directed to the provisions of the Conditions of the Contract regarding guarantees/warranties for the Work. B. Finish Coating System. Submit, on the attached form, a guarantee/warranty for a period of 10 years. C. The guarantee /warranty shall be in addition to and not in lieu of all other liabilities which manufacturer(s), Contractor and the Subcontractor(s) may have by law or by other provisions of the Contract Documents. 1.7 QUALITY ASSURANCE A. Fabricator Qualifications: Firm experienced in successfully producing metal fabrications similar to that indicated for this Project, with sufficient production capacity to produce required units without causing delay in the Work. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.8 PROJECT CONDITIONS SECTION 05500 PAGE 4 METAL FABRICATIONS B. Codes and Standards: The Standards, Specifications and Codes included in respective articles as well as the ones following shall apply 1. AISC "Code of Standard.Practice for Steel Buildings and Bridges." a. Paragraph 4.2.1 of the above code is hereby modified by deletion of the following sentence: "this approval constitutes the Owner's acceptance of all responsibility for the design adequacy of any connections designed by the fabricator as a part of his preparation of these shop drawings." 2. AISC "Specifications for the Design, Fabrication and Erection of Structural Steel for Buildings," including the "Commentary" and Supplements thereto as indicated. 3 AISC "Specifications for Architecturally Exposed Structural Steel." 4 AISC "Specifications for Structural Joints using ASTM A325 or A490 Bolts" approved by the Research Council on Riveted or Bolted Structural Joints of the Engineering Foundation. 5 AWS D1 1 "Structural Welding Code." 6. ASTM A6 "General Requirements for Delivery of Rolled Steel Plates, Shapes, Sheet Piling and Bars for Structural Use.' 7 State Building Code for lateral bracing for suspended ceilings. C. Field Measurements: The fabricator shall field check anchor bolt and concrete layout and coordinate holes in members. If locations of anchors do not permit adjustment, notify General Contractor and Architect. D Fabrication. The fabrication plant shall have current certification of Category II, of the AISC Quality Certification Program. E. Qualify welding processes and welding operators in accordance with AWS D1 1 "Structural Welding Code Steel," D1.3 "Structural Welding Code Sheet Steel" and D1.2 "Structural Welding Code Aluminum." 1 Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. F Engineer Qualifications: Professional engineer licensed to practice structural engineering in the State of Washington and experienced in providing engineering services of the kind indicated that have resulted in the successful installation of metal fabrications similar in material, design, and extent to that indicated for this Project. A. Field Measurements: Check actual locations of walls and other construction to which metal fabrications must fit, by accurate field measurements before fabrication; show recorded measurements on final shop drawings. Coordinate fabrication schedule with construction progress to avoid delay of Work. 1 Where field measurements cannot be made without delaying the Work, guarantee dimensions and proceed with fabrication of products without field measurements. Coordinate construction to ensure that actual opening dimensions correspond to guaranteed dimensions. Allow for trimming and fitting. B. Coordinate miscellaneous metal work with the work of other trades. Take all necessary field measurements before starting fabrication. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS C. Furnish to the applicable Subcontractors all miscellaneous metal items that are to be built into work of other trades, and furnish all necessary templates and information required by those trades to properly locate such items. Furnish items to be built -in in time so as to avoid later cutting and patching. 1.9 REFERENCES A. National standards reference herein are included to establish recognized quality only Equivalent quality and testing standards will be acceptable subject to their timely submission, review and acceptance by the Architect. B Refer to Section 01095 Reference Standards and Definitions, for schedule of references. 1.10 PRODUCT DELIVERY STORAGE AND HANDLING A. Refer to Section 01600, Material, Equipment and Product Substitutions, for requirements pertaining to Product Delivery Storage and Handling. B. Store all miscellaneous metal items under cover and off the ground. Handle in such a manner so as to protect surfaces and to prevent distortion of, and any other type of damage to, fabricated pieces. C. Deliver metal work fully sealed and identified. Protect from damage from any source. Provide removable protection as required. 1.11 SEQUENCING AND SCHEDULING A. Sequence and coordinate installation of wall handrails as follows: 1 Mount handrails only on completed walls. Do not support handrails temporarily by any means not satisfying structural performance requirements. 2. Mount handrails only on gypsum board assemblies reinforced to receive anchors, and where the location of concealed anchor plates has been clearly marked for benefit of Installer PART 2 PRODUCTS 2.1 FERROUS METALS A. Metal Surfaces, General. For metal fabrications exposed to view upon completion of the Work, provide materials selected for their surface flatness, smoothness, and freedom from surface blemishes. Do not use materials whose exposed surfaces exhibit pitting, seam marks, roller marks, rolled trade names, roughness, and, for steel sheet, variations in flatness exceeding those permitted by reference standards for stretcher leveled sheet. All miscellaneous steel fabrications to be hot -dip galvanized, except as noted. B. Steel Plates, Shapes, and Bars: ASTM A 36. C. Rolled Steel Floor Plates: ASTM A 786 1 Checkered Plate Decking a. Pattern. Checkered Raised Pattern b. Thickness: 1/4 inch D Steel Bars for Gratings: ASTM A 569 or ASTM A 36 SECTION 05500 PAGE 5 METAL FABRICATIONS MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS E. Wire Rod for Grating Cross Bars: ASTM A 510 F Steel Tubing: Product type (manufacturing method) and as follows: 1 Hot Formed Steel Tubing: ASTM A 501, furnace butt welded or seamless process. a. For exterior installations and where indicated, provide tubing with hot -dip galvanized coating per ASTM A 53 SECTION 05500 PAGE 6 METAL FABRICATIONS G. Uncoated Structural Steel Sheet: Product type (manufacturing method), quality and grade, as follows: 1 Cold Rolled Structural Steel Sheet: ASTM A 611, grade as follows: a. Grade A, unless otherwise indicated or required by design loading. H. Uncoated Steel Sheet: Commercial quality product type (method of manufacture) as follows: 1 Cold Rolled Steel Sheet: ASTM A 366 I. Galvanized Steel Sheet: Quality as follows: 1 Structural Quality ASTM A 446 Grade A, unless another grade required for design loading, and G90 coating designation unless otherwise indicated. J Steel Pipe: ASTM A 53 finish, type, and weight class as follows: 1 Black finish, unless otherwise indicated. 2. Galvanized finish for exterior installations and where indicated. 3 Type S, Oracle B, standard weight (schedule 40), unless otherwise indicated, or another weight required by structural loads. K. Malleable Iron Castings: ASTM A 47 grade as selected by fabricator L. Brackets, Flanges and Anchors: Cast or formed metal of the same type material and finish as supported rails, unless otherwise indicated. M. Concrete Inserts: Threaded or wedge type; galvanized ferrous castings, either malleable iron, ASTM A 47 or cast steel, ASTM A 27 Provide bolts, washers, and shims as required, hot -dip galvanized per ASTM A 153 N Sleeves: Sleeves through masonry or concrete shall be standard weight wrought iron or galvanized steel, size to allow 1/4 inch between sleeves and pipe. Length of sleeves shall be 1/2 inch less than total thickness of wall or slab in order to provide for application of sealant. O Stamped Steel Grilles: Stamped 10 gauge sheet steel of the sizes and patterns as indicated on the Drawings. P Anchors and Inserts: Provide anchors and inserts for attachment of ornamental items to masonry and concrete. Anchors and inserts shall be non corrosive and compatible with contiguous metals. Q Welding rods and Bare Electrodes: Type and alloy recommended by the producer of the metal to be welded and as required for color match, strength and compatibility in the fabricated items. R. Shop Primer for Ferrous Metal. Tnemec 10 -99 DuPont 67 -789 Valspar 13R50, Ameron 185 or Porter U -Prime 284 Use for priming ferrous metal not otherwise specified to be galvanized. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS S. Zinc -Rich Paint: "ZiRP" by Duncan Galvanizing or "Z.RC." by Sealube Company Use for repairing abraded galvanized surfaces and for painting field welds. T Shop Applied "Finish Coating System" for Galvanized Steel. 1 Prime Coat: Tnemec Series 27 F C. Typoxy DuPont "823HB," Valspar "89 Series," or Ameron "66 2. Top Coat: Tnemec Series 73 Endurashield III, DuPont "Imron 326," Valspar "40 Series," Ameron "Amershield," or Porter "Hythane Super 8610 3 Note: In lieu of the specified Prime and Top Coats, the "Colorgalv" Coating System by Duncan Industries, Everett, MA, is acceptable. 2.2 GROUT AND ANCHORING CEMENT SECTION 05500 PAGE 7 METAL FABRICATIONS A. Nonshrink Nonmetallic Grout: Premixed, factory- packaged, nonstaining, noncorrosive, nongaseous grout complying with CE CRD- C 621. Provide grout specifically recommended by manufacturer for interior and exterior applications of type specified in this section. B. Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include but are not limited to the following: 1 Nonshrink Nonmetallic Grouts: a. "Euco N -S Grout" Euclid Chemical Co. b. "Masterflow 713" Master Builders. c. "Sealtight 588 Grout" W R. Meadows, Inc. d. "Five Star Grout" U S. Grout Corp. 2.3 FASTENERS A. General. Provide zinc- coated fasteners for exterior use or where built into exterior walls. Select fasteners for the type, grade, and class required. B. Bolts and Nuts: Regular hexagon head type, ASTM A 307 Grade A. C. Lag Bolts: Square head type, FS FF -B -561 D Machine Screws: Cadmium plated steel, FS FF -S -92. E. Plain Washers: Round, carbon steel, FS FF -W -92. F Drilled -In Expansion Anchors: Expansion anchors complying with FS FF -S -325 Group VIII (anchors, expansion, Inondrilling]), Type I (internally threaded tubular expansion anchor); and machine bolts complying with FS FF -B -575 Grade 5 G. Toggle Bolts: Tumble -wing type, FS FF -B -588, type, class, and style as required. H. Lock Washers: Helical spring type carbon steel, FS FF -W -84 2.4 FABRICATION, GENERAL A. Form metal fabrications from materials of size, thickness, and shapes indicated but not less than that needed to comply with performance requirements indicated. Work to dimensions indicated or accepted on shop drawings, using proven details of fabrication and support. Use type of materials indicated or specified for various components of each metal fabrication. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05500 PAGE 8 METAL FABRICATIONS B. Form exposed work true to line and level with accurate angles and surfaces and straight sharp edges. C. Shear and punch metals cleanly and accurately Remove burrs. D Ease exposed edges to a radius of approximately 1/32 inch, unless otherwise indicated. Form bent- nnetal corners to smallest radius possible without causing grain separation or otherwise impairing work. E. Remove sharp or rough areas on exposed traffic surfaces. F Weld corners and seams continuously to comply with AWS recommendations and the following: 1 Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3 Remove welding flux immediately 4 At exposed connections, finish exposed welds and surfaces smooth and blended so that no roughness shows after finishing and contour of welded surface matches those adjacent. G. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners wherever possible. Use exposed fasteners of type indicated or if not indicated, Phillips flat- head (countersunk) screws or bolts. Locate joints where least conspicuous. H. Provide for anchorage of type indicated; coordinate with supporting structure. Fabricate and space anchoring devices to provide adequate support for intended use. I. Shop Assembly Preassemble items in shop to greatest extent possible to minimize field splicing and assembly Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation. J Cut, reinforce, drill and tap miscellaneous metal work as indicated to receive finish hardware, screws, and similar items. K. Fabricate joints that will be exposed to weather in a manner to exclude water, or provide weep holes where water may accumulate. L. Include supplementary parts necessary to complete miscellaneous metal work though not definitely shown or specified. M. Verify measurements and dimensions at the job site and cooperate in the coordination and scheduling of the work of this Section with the work of related trades, with particular attention given to the installation of items embedded in concrete and masonry so as not to delay job progress. N. Form metal work built in with concrete or masonry for anchorage, or provide suitable anchors, expansion shields, or other anchoring devices shown or required to provide support for intended use. Furnish such metal work in ample time for setting and securing in place. 0 Make joints as strong and rigid as adjoining sections. Make welds continuous along entire line of contact, except where spot welding is indicated. Grind exposed welds flush and smooth to MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05500 PAGE 9 METAL FABRICATIONS match and blend with adjoining surfaces. Where bolted or riveted connections are indicated, such connections may be welded. P Make up threaded connections tight so that threads are entirely concealed. Shoulder and head, dowel and pin abutting bars. Provide bold and screw heads flat and countersunk in exposed work and elsewhere as required. Carefully machine, fit and secure removable members by means of Allen- head set screws of proper size and spacing. 2.5 ROUGH HARDWARE A. Furnish bent or otherwise custom fabricated bolts, plates, anchors, hangers, dowels, and other miscellaneous steel and iron shapes as required for framing and supporting woodwork, and for anchoring or securing woodwork to concrete or other structures. Straight bolts and other stock rough hardware items are specified in Division 6 sections. B. Fabricate items to sizes, shapes, and dimensions required. Furnish malleable -iron washers for heads and nuts which bear on wood structural connections; elsewhere, furnish steel washers. 2.6 LOOSE BEARING AND LEVELING PLATES A. Provide loose bearing and leveling plates for steel items bearing on masonry or concrete construction, made flat, free from warps or twists, and of required thickness and bearing area. Drill plates to receive anchor bolts and for grouting as required. Galvanize after fabrication. 2.7 LOOSE STEEL LINTELS A. Fabricate loose structural steel lintels from steel angles and shapes of size indicated for openings and recesses in masonry walls and partitions at locations indicated. B. Furnish loose steel lintels as shown and as required over openings in masonry walls, partitions, and shafts for installation under Section 04200, Unit Masonry Include lintels for mechanical openings as required. Furnish lintels 16 inches longer than the width of the opening at which they are installed. Metal door frames for doors and fixed lite frames up to 3 feet in width are provided with the specified integral head reinforcements; furnish loose steel lintels only for loose openings in excess of 3 feet in width. C. Weld adjoining members together to form a single unit where indicated. D Size loose lintels for equal bearing of one inch per foot of clear span but not less than 8 inches bearing at each side of openings, unless otherwise indicated. E. Hot -dip galvanize loose steel lintels located at exterior walls. 2.8 MISCELLANEOUS FRAMING AND SUPPORTS A. General. Provide steel framing and supports for applications indicated or which are not a part of structural steel framework, as required to complete work. B. Fabricate units to sizes, shapes, and profiles indicated and required to receive adjacent other construction retained by framing and supports. Fabricate from structural steel shapes, plates, and steel bars of welded construction using mitered joints for field connection. Cut, drill, and tap units to receive hardware, hangers, and similar items. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.11 SLEEVES 2. Interior locations where indicated. 2.9 MISCELLANEOUS STEEL TRIM 2.10 SHELF AND RELIEVING ANGLES 2.12 FINISHES, GENERAL SECTION 05500 PAGE 10 METAL FABRICATIONS 1 Equip units with integrally welded anchors for casting into concrete or building into masonry Furnish inserts if units must be installed after concrete is placed. a. Except as otherwise.indicated, space anchors 24 inches o.c. and provide minimum anchor units in the form of steel straps 1 -1/4 inches wide x 1/4 inch x 8 inches long. C. Galvanize miscellaneous framing and supports in the following locations: 1 Exterior locations. A. Provide shapes and sizes indicated for profiles shown. Unless otherwise indicated, fabricate units from structural steel shapes, plates, and steel bars, with continuously welded joints and smooth exposed edges. Use concealed field splices wherever possible. Provide cutouts, fittings, and anchorages as required for coordination of assembly and installation with other work. B. Hot -dip galvanize miscellaneous framing and supports in the following locations: 1 Exterior locations. 2. Interior locations where indicated. A. Fabricate shelf and relieving angles from steel angles of sizes indicated and for attachment to concrete framing. Provide slotted holes to receive 3/4 inch bolts, spaced not more than 6 inches from ends and not more than 24 inches o.c. unless otherwise indicated. B. Hot -dip galvanize shelf angles to be installed on exterior concrete framing. C. Furnish wedge -type concrete inserts, complete with fasteners, for attachment of shelf angles to cast -in -place concrete. A. Sleeves through masonry or concrete shall be standard weight wrought iron or galvanized steel, size to allow 1/4 in. between sleeves and steel posts. Length of sleeves shall be 1/2 in. less than total thickness of wall or slab in order to provide for application of sealant. A. Comply with NAAMM "Metal Finishes Manual" for recommendations relative to application and designations of finishes. B. Finish metal fabrications after assembly 2.13 SHOP PAINTING A. General 1 Shop paint miscellaneous metal work, except members or portions of members to be embedded in concrete or masonry surfaces and edges to be field welded, unless otherwise specified. 2. Clean and prepare metal surfaces before applying shop coat in accordance with SSPC SP-6 "Commercial Blast." MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3 Remove oil, grease and similar contaminants in accordance with SSPC SP -1, "Solvent Cleaning." 4 Note: It is to be understood by the Miscellaneous Metal Subcontractor that all coatings must conform to all state and local regulations, including VOC/VOS rules at the time of application. 2.14 STEEL AND IRON FINISHES SECTION 05500 PAGE 11 METAL FABRICATIONS A. Galvanizing: For those items indicated for galvanizing, apply zinc- coating by the hot -dip process compliance with the following requirements: 1 ASTM A 153 for galvanizing iron and steel hardware. 2. ASTM A 123 for galvanizing both fabricated and =fabricated iron and steel products made of uncoated rolled, pressed, and forged shapes, plates, bars, and strip 0 0299 inch thick and heavier B. In addition to the requirements of ASTM Al23 and A153 add a predetermined amount of nickel, not less than 0 05 percent by weight, to reduce the effect of silicon steel. The fabricator shall comply with ASTM A143 to safeguard against embrittlement, ASTM A384 to safeguard against warpage and distortion, and ASTM A385 NOTE. All items to be galvanized shall be galvanized after fabrication. C. Quality Assurance 1 Mark all hot -dip galvanized material with a stamp indicating the appropriate ASTM designation and the number of ounces per square foot of zinc coating, similar to the Duncan stamp. 2. The galvanizer shall, with the initial shipment of items to the project site, submit two notarized affidavits certifying compliance with referenced standards specified herein to the Quality Assurance Representative. D Items of Work Requiring Galvanizing 1 Exterior miscellaneous metals* 2. Exterior areaway grating, frames, and ladders.* 3 Exterior steel loose lintels, paint only exposed -to -view surfaces.* 4 Elevator pit ladders. 5 All sleeves, bolts, nuts, and other hardware in conjunction with galvanized items of work. 6. All other miscellaneous metals specifically noted on the Drawings to be galvanized.* *NOTE. In addition to galvanizing, shop apply a coat of "Shop Primer for Galvanized Steel. MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS E. Preparation for Shop Priming: Prepare uncoated ferrous metal surfaces to comply with minimum requirements indicated below for SSPC surface preparation specifications and environmental exposure conditions of installed metal fabrications: 1. Exteriors (SSPC Zone 1B)• SSPC -SP6 "Commercial Blast Cleaning." 2. Interiors (SSPC Zone 1A): SSPC -SP3 "Power Tool Cleaning: F Apply shop primer to uncoated surfaces of metal fabrications, except those with galvanized finish or to be embedded in concrete, sprayed -on fireproofing, or masonry unless otherwise indicated. Comply with requirements of SSPC -PA1 "Paint Application Specification No. 1" for shop painting. 1 Stripe paint all edges, corners, crevices, bolts, welds, and sharp edges. 2. Shop -Prime Painting for Ferrous Metal a. Immediately after surface preparation, apply specified primer in accordance with manufacturer's instructions. Use painting methods which will result in full coverage and give a minimum dry film thickness of 3 0 mils. b. Apply one shop coat to fabricated metal items, except apply two coats of paint to surfaces inaccessible after assembly or erection. Change color of second coat to distinguish it form the first. 3 Shop -Prime Painting for Galvanized Steel to be Field Painted a. Lightly brush blast galvanized surfaces immediately prior to application of prime coat if galvanized items have been allowed to standard for more than 12 hours. b. Apply galvanized prime paint over freshly galvanized steel at a minimum dry film thickness of 2.0 to 3 0 mils in accordance with paint manufacturer's instructions. 2.14 METAL MOULDING A. Provide continuously formed 125' thick, 5 inch diameter half -round aluminum shapes with matching end caps. B. Aluminum Members: Alloy and temper recommended by the manufacturer for strength, corrosion resistance, and application of required finish; comply with ASTM B209 for aluminum sheet or plate. C. Finishes NOTE. 'Primergaly if used, shall be applied in accordance with Duncan Industries application procedures. SECTION 05500 PAGE 12 METAL FABRICATIONS 4 Dissimilar Metals: Separate dissimilar metals with one coat of dielectric separator 5 Notification. Notify Owner's Testing Agency 5 days prior to shipment of any miscellaneous steel so paint inspection can be made. At these inspections, dry mil thickness of paint film will be checked along with surface appearance. 1 General. Comply with AMP 501 'Finishes for Aluminum' and AMP 505 Applied Coatings' for finish designations and application recommendations, except as otherwise indicated. For components which are assembled or welded in factory apply finish after fabrication is completed. a. Provide colors or color matches as indicated or, if not indicated, as selected by Architect from manufacturer's standard Colors. MAHLUM NORDFORS McKLNLEY GORDON, OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Provide conceal fasteners wherever possible. PART 3 EXECUTION 3.1 PREPARATION 3.2 INSTALLATION, GENERAL SECTION 05500 PAGE 13 METAL FABRICATIONS 2. High Performance Coating: AA- C12C42R1x (cleaned with inhibitive chemicals, conversion coated with an acid chromate- fluoride phosphate treatment and painted with organic coating specified below). Apply in strict compliance with coating and resin manufacturer's instructions using a licensed applicator a. Fluorocarbon Coating: Inhibitive thermo -cured primer, minimum 0.2 -mil dry film thickness, and thermo -cured fluorocarbon coating containing `Kynar 500' resin, minimum 1 0-mil dry film thickness. A. Coordinate and furnish anchorages, setting drawings, diagrams, templates, instructions, and directions for installation of anchorages, including concrete inserts, sleeves, anchor bolts, and miscellaneous items having integral anchors that are to be embedded in concrete or masonry construction. Coordinate delivery of such items to project site. B. Center nosings on tread widths with noses flush with riser faces and tread surfaces. C. Set sleeves in concrete with tops flush with finish surface elevations; protect sleeves from water and concrete entry A. Fastening to In -Place Construction. Provide anchorage devices and fasteners where necessary for securing miscellaneous metal fabrications to in -place construction; include threaded fasteners for concrete and masonry inserts, toggle bolts, through- bolts, lag bolts, wood screws, and other connectors as required. B. Do not cut or alter members in the field without the Architect's approval. Do not enlarge unfair holes by burning and forcing, but correct by reaming. C. Take all measurements required at the building. Check measurements, compare dimensions and other data with various trades installing adjoining work to assure proper coordination. D Carefully handle and stack all materials to prevent deformation and damage. Take care to prevent damage to the shop coat of paint and to prevent the accumulation of mud, dirt or other foreign matter on the metal work. Remove all such dirt prior to erection. E. Do all drilling and fitting, cutting, welding, bolting and riveting required to erect, install and fit metal work to adjoining work. Conform to AISC Code. Furnish all screws, bolts, anchors, etc. required to attach metal work securely to adjoining work. Set metal fabrication accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels. F Provide temporary bracing or anchors in formwork for items that are to be built into concrete masonry or similar construction. G. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints, but cannot be shop welded because of shipping size limitations. Do not weld, cut, or abrade the surfaces of exterior units which have been hot -dip galvanized after fabrication, and are intended for bolted or screwed field connections. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05500 PAGE 14 METAL FABRICATIONS H. Field Welding: Comply with AWS Code for procedures of manual shielded metal -arc welding, appearance and quality of welds made, methods used in correcting welding work, and the following: 1 Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. `Obtain fusion without undercut or overlap. 3 Remove welding flux immediately 4 At exposed connections, finish exposed welds and surfaces smooth and blended so that no roughness shows after finishing and contour of welded surface matches those adjacent. I. Corrosion Protection. Coat concealed surfaces of aluminum that will come into contact with grout, concrete, masonry wood, or dissimilar metals with a heavy coat of bituminous paint or zinc chromate primer J Protect finished surfaces against damage during subsequent construction operations and remove such protection at time of substantial completion. K. Deliver items which are to be built into the work of other Sections in time so as not to delay the progress of the work. L. Cuts or abraded finishes which cannot be completely restored in the field shall be returned to the shop for required alterations, followed by complete refinishing or provide new units at no cost to the Owner M. Restore protective coverings which have been damaged during shipment or installation of the work. Remove protective coverings only when there is no possibility of damage from other work yet to be performed at the same location. N. Retain protective coverings intact and remove simultaneously from similarly finished items to preclude nonuniform oxidation and discoloration. 0 At completion of installation, remove strippable protective covering from bronze surfaces, thoroughly clean all residue from surface, and apply a coating of lemon oil as specified above. 3.3 SETTING LOOSE PLATES A. Clean concrete and masonry bearing surfaces of any bond reducing materials, and roughen to improve bond to surfaces. Clean bottom surface of bearing plates. B Set loose leveling and bearing plates on wedges, or other adjustable devices. After the bearing members have been positioned and plumbed, tighten the anchor bolts. Do not remove wedges or shims, but if protruding, cut off flush with the edge of the bearing plate before packing with grout. 1 Use metallic nonshrink grout in concealed locations where not exposed to moisture; use nonmetallic nonshrink grout in exposed locations, unless otherwise indicated. 2. Pack grout solidly between bearing surfaces and plates to ensure that no voids remain. 3.4 SHELF ANGLES A. Install galvanized steel shelf angles where indicated. Provide solid hot -dip galvanized metal shim stock at each fastener and as required for accurate placement, structural support, and to meet all applicable requirements specified herein. MAHLUM NORDFORS McKINLEY GORDON, OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05500 PAGE 15 METAL FABRICATIONS 3.5 INSTALLATION OF SUPPORTS FOR TOILET PARTITIONS A. Anchor supports securely to, and rigidly brace from, overhead building structure. 3.6 ADJUSTING AND CLEANING A. Touch -Up Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with same material as used for shop painting to comply with SSPC -PA 1 requirements for touch -up of field painted surfaces. 1 Apply by brush or spray to provide a minimum dry film thickness of 4 0 mils. B. Touch -Up Painting: Cleaning and touch -up painting of field welds, bolted connections, and abraded areas of the shop paint on miscellaneous metal is specified in Division 9 Section "Painting" of these specifications. C. For galvanized surfaces clean welds, bolted connections and abraded areas and apply galvanizing repair paint to comply with ASTM A 780 01997 Mahhun Nordfors McKinley Gordon END OF SECTION 05500 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary c onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Straight run, steel -framed stairs. 2. Steel pipe handrails and railing systems attached to metal stairs. SECTION 05510 PAGE 1 METAL STAIRS B Configuration. Pre- engineered, temporary exterior exit stair with the following features: 1 Treads and Platforms: Non -slip safety grit permanently bonded to sheet steel. 2. Railings: Manufacturer's standard railing and handrail system complying with NFPA 101 and Chapter 11 of the Washington State Amendments to the Uniform Building Code (ADA.) Handrails and railings to be integral with stair system, independent from building. 3 Riser height: Not to exceed 7 inches 1.3 PERFORMANCE REQUIREMENTS A. Structural Performance: Engineer fabricate, and install steel stairs to withstand the following structural loads without exceeding the allowable design working stress of the materials involved, including anchors and connections. Apply each load to produce the maximum stress in each component of steel stairs. 1. Treads of Steel Stairs: Capable of withstanding a uniform load of 100 lbf per sq. ft. (4 8 kN /sq. m) or a concentrated load of 300 lbf (1.35 kN) on a area of 4 sq. inches (26 sq. cm) located in the center of the tread, whichever produces the greater stress. 2. Platforms of Steel Stairs: Capable of withstanding a uniform load of 100 lbf per sq. ft. (4.8 kN /sq. m). 3 Stair Framing: Capable of withstanding stresses resulting from loads specified above as well as stresses resulting from railing system loads. B Structural Performance: Engineer, fabricate, and install handrails and railing systems to withstand the following structural loads without exceeding the allowable design working stress of the materials involved, including anchors and connections. Apply each load to produce the maximum stress in each of the respective components of each metal fabrication. 1 Top Rail of Guardrail Systems: Capable of withstanding the following loads applied as indicated: a. Concentrated load of 200 lbf (890 N) applied at any point and in any direction. b. Uniform load of 50 lbf per linear foot (730 N /m) applied horizontally and concurrently with uniform load of 100 lbf per linear foot (1460 N /m) applied vertically downward. c. Concentrated and uniform loads above need not be assumed to act concurrently MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 05510 PAGE 2 METAL STAIRS 2. Handrails Not Serving as Top Rails: Capable of withstanding the following loads applied as indicated: a. Concentrated load of 200 lbf (890 N) applied at any point and in any direction. b. Uniform load of 50 lbf per linear foot (730 N /m) applied in any direction. .c. Concentrated and uniform loads above need not be assumed to act concurrently 3 Infill Area of Guardrail Systems: Capable of withstanding a horizontal concentrated load of 200 lbf (890 N) applied to one sq. ft. (0 09 sq. m) at any point in the system including panels, intermediate rails, balusters, or other elements composing the infill area. a. Above load need not be assumed to act' concurrently with loads on top rails of railing systems in determining stress on guard. 1.4 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product data for metal stairs and steel floor plate treads. C. Shop drawings detailing fabrication and installation of steel stairs. Include plans, elevations, sections, and details of steel stairs and their connections. Show anchorage and accessory items. Provide templates for anchors and bolts specified for installation under other sections. D Welder certificates signed by Contractor certifying that welders comply with requirements specified under the "Quality Assurance" Article. E. Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their capabilities and experience. Include list of completed projects with project names, addresses, names of architects and owners, and other information specified. 1.5 QUALITY ASSURANCE A. Fabricator Qualifications: Firm experienced in producing steel stairs similar to those indicated for this Project with a record of successful in- service performance and with sufficient production capacity to produce required units without delaying the Work. B Installer Qualifications: Arrange for steel stair installation specified in this Section by the same firm that fabricated them. C. Engineer Qualifications: A professional engineer legally authorized to practice structural engineering in jurisdiction where Project is located and experienced in providing engineering services of the kind indicated that have resulted in the installation of metal stairs (including handrails and railing systems) similar to this Project in material, design, and extent and that have a record of successful in- service performance. D Welding Standards: Comply with applicable provisions of AWS D1 1 "Structural Welding Code—Steel" and AWS D1.3 "Structural Welding Code —Sheet Steel." 1 Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. MAHLUM NORDFORS MclUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 2 PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering preassembled stair units that may be incorporated in the Work include, but are not limited to, the following: 1 Alfab, Inc. 2. Ambassador Stair 3 American Metal Works, Inc. 4 American Stair Corp. Inc. 5 National Stair and Rail, Inc. 6 The Sharon Companies, Ltd. 2.2 FERROUS METALS A. Metal Surfaces, General. For surfaces exposed to view in the completed Work, provide materials selected for their surface flatness, smoothness, and freedom from surface blemishes. Do not use materials with exposed pitting, seam marks, roller marks, rolled trade names, roughness, or, for steel sheet, variations in flatness exceeding those permitted by referenced standards for stretcher- leveled sheet. B Steel Plates, Shapes, and Bars: ASTM A 36/A 36M. SECTION 05510 PAGE 3 METAL STAIRS C. Steel Tubing: Product type (manufacturing method) and as follows: 1 Cold- Formed Steel Tubing: ASTM A 500 2. Hot Formed Steel Tubing: ASTM A 501 a. For exterior installations and where indicated, provide tubing with hot -dip galvanized coating per ASTM A 53 D Steel Pipe: ASTM A 53 standard weight (schedule 40), unless otherwise indicated, or another weight required by structural loads. 1 Black finish, unless otherwise indicated. E. Rolled Steel Floor Plate: ASTM A 786/A 786M. F Uncoated Structural Steel Sheet: Product type (manufacturing method), quality and grade as follows: 1 Hot Rolled Structural Steel Sheet: ASTM A 570/A 570M, grade as follows: a. Grade 30 unless otherwise indicated or required by design loading. G. Uncoated Steel Sheet: Commercial quality product type (method of manufacture) as follows: 1 Hot Rolled Steel Sheet: ASTM A 569/A 569M. H. Welding Rods and Bare Electrodes: Select according to AWS specifications for the metal alloy to be welded. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05510 PAGE 4 METAL STAIRS 2.3 FASTENERS A. General. Provide plated fasteners complying with ASTM B 633 Class Fe/Zn 25 for electrodeposited zinc coating, for exterior use or where built into exterior walls. Select fasteners for the type, grade, and class required. 2.4 PAINT A. Shop Primer for Ferrous Metal. Fast curing, lead- and chromate -free, universal modified -alkyd primer complying with performance requirements of FS TT-P-664 selected for good resistance to normal atmospheric corrosion, compatibility with finish paint systems indicated, and capability to provide a sound foundation for field- applied topcoats despite prolonged exposure. 2.10 FABRICATION, GENERAL A. Form steel stairs from materials of size, thickness, and shapes indicated, but not less than that needed to comply with performance requirements indicated. Work to dimensions indicated or accepted on shop drawings, using proven details of fabrication and support. B Form exposed work true to line and level with accurate angles and surfaces and straight sharp edges. C Shear and punch metals cleanly and accurately D Remove sharp or rough areas on exposed surfaces. E. Ease exposed edges to a radius of approximately 1/32. inch (1 nun), unless otherwise indicated. Form bent -metal corners to smallest radius possible without causing grain separation or otherwise impairing work. F Weld corners and seams continuously to comply with the following: 1 Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3 Remove welding flux immediately 4 At exposed connections, finish exposed welds and surfaces smooth and blended so that no roughness shows after finishing, and welded surface matches contours of adjoining surfaces. G. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners wherever possible. Use exposed fasteners of type indicated or, if not indicated, Phillips flat- head (countersunk) screws or bolts. Locate joints where least conspicuous. H. Shop Assembly Preassemble in shop to greatest extent possible to minimize field splicing and assembly Use connections that maintain structural value of joined pieces. Clearly mark units for field assembly and coordinated installation. I. Fabricate joints that will be exposed to weather in a manner to exclude water, or provide weep holes where water may accumulate. 2.11 STEEL FRAMED STAIRS A. General. Construct stairs to conform to sizes and arrangements indicated. Join pieces together by welding, unless otherwise indicated. Provide complete stair assemblies, including metal framing, hangers, columns, handrails, railing systems, newels, balusters, struts, clips, brackets, MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 05510 PAGE 5 METAL STAIRS bearing plates, or other components necessary for the support of stairs and platforms, and as required to anchor and contain the stairs on the supporting structure. 1. NAAMM Stair Standard. Comply with "Reconunended Voluntary Minimum Standards for Fixed Metal Stairs" in NAAMM "Metal Stair Manual" for class of stair designated, except where more stringent requirements are indicated. a. Commercial class, unless otherwise indicated. 2. Fabricate treads and platforms of exterior stairs to accommodate slopes to drain in finished traffic surfaces. B. Stair Framing: Fabricate stringers of structural steel channels, plates, or a combination thereof, as indicated. Provide closures for exposed ends of stringers. Construct platforms of structural steel channel headers and miscellaneous framing members as indicated. Bolt or weld headers to stringers; and bolt or weld newels and framing members to stringers and headers. If using bolts, fabricate and join so bolts are not exposed on finish surfaces. C. Steel Floor Plate Treads and Platforms: Provide abrasive surface floor plate. 1 Abrasive Surface Floor Plate: Manufacturer's standard abrasive granules, rolled into surface of steel plate. Provide material with coefficient of friction (COF) of 0.6 or higher when tested according to ASTM C 1028. 2. Form treads of 1/4 -inch- (6 -mm thick steel floor plate with integral nosing and back edge stiffener Weld steel supporting brackets to stringers and weld treads to brackets. 2.12 STEEL PIPE HANDRAILS AND RAILING SYSTEMS A. General. Fabricate pipe handrails and railing systems to comply with requirements indicated for design, dimensions, details, finish, and member sizes, including wall thickness of pipe, post spacings, and anchorage, but not less than that required to support structural loads. B. Interconnect railing and handrail members by butt- welding or welding with internal connectors, at fabricator's option, unless otherwise indicated. 1 At tee and cross intersections, cope ends of intersecting members to fit contour of pipe to which end is joined, and weld all around. C Form changes in direction of handrails and rails as follows: 1 By welding in prefabricated flush elbow fittings. 2. By radius bends of radius indicated. 3 By flush radius bends. 4 By bending. 5 By any method indicated above, applicable to change of direction involved. D Form simple and compound curves by bending pipe in jigs to produce uniform curvature for each repetitive configuration required; maintain cylindrical cross section of pipe throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of pipe. E. Provide wall returns at ends of wall mounted handrails, unless otherwise indicated. F Close exposed ends of pipe by welding 3/16 -inch- (4.8 -mm thick steel plate in place or with prefabricated fittings, except where clearance of end of pipe and adjoining wall surface is 1/4 inch (6 min) or less. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.14 FINISHES SECTION 05510 PAGE 6 METAL STAIRS G. Brackets, Flanges, Fittings, and Anchors: Provide wall brackets, end closures, flanges, miscellaneous fittings, and anchors for interconnections of pipe and attachment of handrails and railing systems to other work. Furnish inserts and other anchorage devices for connecting handrails and railing systems to concrete or masonry work. 1 Connect railing posts to stair framing by direct welding, unless otherwise indicated. H. Fillers: Provide steel sheet or plate fillers of thickness and size indicated or required to support structural loads of handrails where needed to transfer wall bracket loads through wall finishes to structural supports. Size fillers to suit wall finish thicknesses. Size fillers to produce adequate bearing to prevent bracket rotation and overstressing of substrate. For nongalvanized steel handrails and railing systems, provide nongalvanized ferrous metal fittings, brackets, fasteners, and sleeves, except galvanize anchors embedded in exterior masonry and concrete construction. A. General: Finish metal stairs after assembly 1. Comply with NAAMM "Metal Finishes Manual" for recommendations on application and designations of finishes. B Preparation for Shop Priming: Prepare uncoated ferrous metal surfaces to comply with minimum requirements indicated below for SSPC surface preparation specifications and environmental exposure conditions of installed units: 1 Exteriors (SSPC Zone 1B). SSPC SP 6 "Commercial Blast Cleaning." C. Apply shop primer to uncoated surfaces, except those with galvanized finish or those to be embedded in concrete, sprayed -on fireproofing, or masonry unless otherwise indicated. Comply with requirements of SSPC -PA 1 "Paint Application Specification No. 1" for shop painting. 1 Stripe paint corners, crevices, bolts, welds, and sharp edges. PART 3 EXECUTION 3.1 PREPARATION A. Coordinate and furnish anchorages, setting drawings, diagrams, templates, instructions, and directions for installing anchorages, including concrete inserts, weld plates, and anchor bolts. Coordinate delivery of such items to Project site. 3.2 INSTALLATION, GENERAL A. Fastening to In -Place Construction. Provide anchorage devices and fasteners where necessary for securing steel stairs to in -place construction; include threaded fasteners for concrete and masonry inserts, through bolts, lag bolts, and other connectors as required. B. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing steel stairs. Set units accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels. C. Install steel stairs by welding stair framing to steel structure or to weld plates cast into concrete, except where otherwise indicated. MAHLUM NORDFORS Mc}QNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS D Provide temporary bracing or anchors in formwork for items that are to be built into concrete, masonry or similar construction. E. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations. Do not weld, cut, or abrade the surfaces of exterior units that have been hot -dip galvanized after fabrication and are intended for bolted field connections. F Field Welding: Comply with the following requirements: 1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 2. Obtain fusion without undercut or overlap. 3 Remove welding flux immediately 4 At exposed connections, finish exposed welds and surfaces smooth and blended so that no roughness shows after finishing and welded surface matches contours of adjoining surfaces. 3.3 INSTALLING STEEL STAIRS WITH GROUTED BASE PLATES A. Clean concrete and masonry bearing surfaces of bond reducing materials and roughen to improve bond to surfaces. Clean bottom surface of base plates. B. Set steel stair base plates on wedges or other adjustable devices. After the stairs have been positioned and aligned, tighten the anchor bolts. Do not remove wedges or shims, but if protruding, cut off flush with the edge of the bearing plate before packing with grout. 1 Use nonmetallic, nonshrink grout, unless otherwise indicated. 2. Pack grout solidly between bearing surfaces and plates to ensure that no voids remain. 3.4 INSTALLING STEEL PIPE RAILINGS AND HANDRAILS A. Adjust handrails and railing systems prior to anchoring to ensure matching alignment at abutting joints. Space posts at spacing indicated or, if not indicated, as required by design loadings. Plumb posts in each direction. Secure posts and railing ends to building construction as follows: 1 Anchor posts to steel by welding directly to steel supporting members. 3.5 ADJUSTING AND CLEANING 0 1997 Mahhun Nordfors McKinley Gordon SECTION 05510 PAGE 7 METAL STAIRS A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with same material as used for shop painting to comply with SSPC -PA 1 requirements for touching up field painted surfaces. 1 Apply by brush or spray to provide a minimum dry film thickness of 2.0 mils (0 05 mm). END OF SECTION 05510 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawing and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Floor expansion joint cover assemblies. 2. Wall expansion joint cover assemblies. 3 Ceiling expansion joint cover assemblies. 4 Soffit expansion joint cover assemblies. 5 Fire -rated expansion joint cover assemblies. 6 Seismic expansion joint cover assemblies. 7 Compression seals. 1.3 SUBMITTALS SECTION 05810 PAGE 1 EXPANSION JOINT COVER ASSEMBLIES B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 3 Section "Cast -In -Place Concrete" for cast -in anchorage and frames for expansion joints cover assemblies in concrete floors, parking decks, and walls. 2. Division 7 Section "Flashing and Sheet Metal for sheet metal roof and wall expansion joint systems. 3 Division 7 Section "Roof Accessories' for curb -type expansion joints. 4 Division 7 Section "Joint Sealants" for elastomeric sealants and preformed foam sealants without metal frames. 5 Division 9 Sections for walls, partitions, ceilings, and floor finishes with expansion joints. A. General. Submit the following according to Conditions of the Contract and Division 1 Specification Sections. B Product data for each type of expansion joint cover assembly specified, including manufacturer's product specifications, installation instructions, details of construction relative to materials, dimensions of individual components, profiles, and finishes. C. Shop drawings showing fabrication and installation of expansion joint cover assembly including plans, elevations, sections, details of components, joints, splices, and attachments to other units of Work. D Samples for initial selection purposes in the form of manufacturer's color charts, actual units, or sections of units showing full range of colors, textures, and patterns available for each exposed metal and elastomeric material of expansion joint cover assembly indicated. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.4 QUALITY ASSURANCE A. Single Source Responsibility Obtain expansion joint cover assemblies specified in this Section from one source from a single manufacturer Coordinate compatibility with expansion joint cover assemblies specified in other sections. B. Fire -Ttst- Response Characteristics: Where indicated, provide expansion joint cover assemblies identical to those assemblies whose fire resistance has been determined per ANSI/UL 263 NFPA 251, U.B.C. 43 -1, or ASTM E 119 including hose stream test of vertical wall assemblies, by a testing and inspecting agency acceptable to authorities having jurisdiction. 1 Fire Resistance Ratings: Not less than the rating of adjacent construction. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the products specified in each Expansion Joint Cover Assemblies Schedule at end of this Section. 2.2 MATERIALS SECTION 05810 PAGE 2 EXPANSION JOINT COVER ASSEMBLIES A. Aluminum. ASTM B 221, alloy 6063 -T5 for extrusions; ASTM B 209 alloy 6061 T6 sheet and plate. 1 Protect aluminum surfaces to be placed in contact with cementitious materials with a protective coating. B Extruded Preformed Seals: Single or multicellular elastomeric profiles as classified under ASTM D 2000 designed with or without continuous, longitudinal, internal baffles. Formed to fit compatible frames, in color indicated or if not indicated, as selected by Architect from manufacturer's standard colors. C. Preformed Sealant: Manufacturer's standard elastomeric sealant complying with ASTM C 920 Use T factory- formed and bonded to metal frames or anchor members; in color indicated or if not indicated, as selected by Architect from manufacturer's standard colors. 1 Joints 2 Inches Wide and Less: Withstand plus or minus 35 percent movement of the joint width without failure. 2. Joints Greater Than 2 Inches to 4 Inches Wide: Withstand plus or minus 50 percent movement of the joint width without failure. D Seismic Seals: Typically for exterior application, two single layered elastomeric profiles, one interior and one exterior as classified under ASTM D 2000• retained in a set of compatible frames, in color indicated or, if not indicated, as selected by Architect from manufacturer's standard colors. At manufacturer's option, omit interior profile for interior application. E. Fire Barriers: Designed for indicated or required dynamic structural movement without material degradation or fatigue when tested according to ASTM E 1399 Tested in maximum joint width condition with a field splice as a component of an expansion joint cover per ANSI/UL 263 NFPA 251, U.B.C. 43 -1 or ASTM E 119 including hose stream test of vertical wall assemblies by a nationally recognized testing and inspecting agency acceptable to authorities having jurisdiction. MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 05810 PAGE 3 EXPANSION JOINT COVER ASSEMBLIES F Accessories: Manufacturer's standard anchors, fasteners, set screws, spacers, flexible moisture barrier and filler materials, drain tubes, lubricants, adhesive, and other accessories compatible with material in contact, as indicated or required for complete installations. 2.3 EXPANSION JOINT COVER ASSEMBLIES A. General. Provide expansion joint cover assemblies of design, basic profile, materials, and operation indicated. Provide units comparable to those indicated or required to accommodate joint size, variations in adjacent surfaces, and dynamic structural movement without material degradation or fatigue when tested according to ASTM E 1399 Furnish units in longest practicable lengths to minimize number of end joints. Provide hairline mitered corners where joint changes directions or abuts other materials. Include closure materials and transition pieces, tee joints, corners, curbs, cross connections, and other accessories as required to provide continuous joint cover assemblies. B. Moisture Barrier Provide manufacturer's continuous, standard, flexible vinyl moisture barrier under covers at locations indicated. C. Fire -Rated Joint Covers: Provide expansion joint cover assemblies with manufacturer's continuous, standard, flexible fire barrier seals under covers at locations indicated to provide fire resistive rating not less than the rating of adjacent construction. D Coverless Fire Barrier Provide manufacturer's continuous standard flexible fire barrier seals at locations indicated to provide fire resistive rating not less than the rating of adjacent construction. E. Metal Floor -to -Floor Joint Cover Assemblies: Provide continuous extruded metal frames of profile indicated with seating surface and raised floor rim or exposed trim strip to accommodate flooring and concealed bolt and anchors embedded in concrete. Provide assemblies formed to receive cover plates of design indicated and to receive filler materials (if any) between raised rim of frame and edge of plate. Furnish depth and configuration to suit type of construction and to produce a continuous flush wearing surface with adjoining finish floor surface. 1 Partially Concealed Cover Provide one frame on each side of joint, designed to accommodate manufacturer's floor cover plate and filler 2. Exposed Cover Provide one frame on each side of joint, designed to support floor plate and filler 3 Flat Cover Plates: Provide cover plates of profile and wearing surface indicated. Extend flat plates to lap each side of joint. a. Filler Insert: Furnish abrasive resistant flexible gasket filler between edge of cover plate and raised rim of frame to accommodate required movement. 4 Fixed Cover Plates: Attach one side of the cover plate to a frame or finished wearing surface, with other side resting on other frame or finished wearing surface to allow free movement. 5 Self Centering Cover Plates: Concealed centering device with the cover plate secured in or on top of frames as to have free movement on both sides. 6. Floor Cover Plate Wearing Surfaces: Provide cover plates with the following type of wearing surfaces. a. Plain. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 05810 PAGE 4 EXPANSION JOINT COVER ASSEMBLIES F Floor -to -Wall Joints: Provide one frame on floor side of joint only Provide wall side frame where required by manufacturer's design. 1 Angle Cover Plates: Attach angle cover plates for floor -to -wall joints to wall with countersunk, flat -head exposed fasteners secured to drilled -in -place anchor shields, unless otherwise indicated, at spacing recommended by joint cover manufacturer G. Wall, Ceiling, and Soffit Joint Cover Assemblies: Provide interior wall and ceiling expansion joint cover assemblies of same design and appearance. Provide exterior wall and soffit expansion joint cover assemblies of same design and appearance. Provide wall expansion joint cover assemblies compatible with floor expansion joint cover assemblies design and appearance. 1 Floating Metal Cover Plates: Cover plate secured in or on top of frames to permit free movement on both sides. 2. Self Centering Cover Plates: Concealed centering device with the cover plate secured in or on top of frames to permit free movement on both sides. 3 Flexible Filler Secure the approved flexible filler between frames to compress and expand with movement. H. Joint Cover Assemblies with Preformed Seals: Provide joint cover assemblies consisting of continuously anchored aluminum extrusions and continuous extruded preformed seals of profile indicated or required to suit types of installation conditions shown: Furnish extrusions designed to be embedded in or attached to concrete with lugs. Vulcanize or heat -weld splices (if any) to ensure hermetic joint condition. 1 Cover Plate: Include extruded aluminum cover plate fastened to one side of joint and extend plate to lap each side of joint to permit free movement with cover in close contact with adjacent contact surfaces. I. Compression Seals: Preformed, elastomeric extrusions having internal baffle system in sizes and profiles shown or as recommended by the manufacturer Provide lubricant and adhesive for installation recommended by the manufacturer 2.4 METAL FINISHES A. General. Comply with NAAMM 'Metal Finishes Manual for finish designations and application recommendations, except as otherwise indicated. Apply finishes to products in factory after fabrication. Protect finishes on exposed surfaces before shipment. B. Aluminum Finishes: Finish designations prefixed by AA conform to the system established by the Aluminum Association for designating aluminum finishes. 1 Class II, Clear- Anodized Finish. AA- M12C22A31 (Mechanical Finish. as fabricated, nonspecular Chemical Finish. etched, medium matte; Anodic Coating: Class II Architectural, clear film thicker than 0 4 mil). PART 3 EXECUTION 3.1 PREPARATION A. Manufacturer's Instructions: In addition to requirements of these specifications, comply with manufacturer's instructions and recommendations for phases of Work, including preparing substrate, applying materials, and protecting installed units. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.2 INSTALLATION 3.3 CLEANING AND PROTECTION 3.4 SCHEDULE A. Expansion Joint Designation EJ -1, Suspended Ceiling to Suspended Ceiling 1 Type: Flush mounted with flexible vinyl insert. 2. Nominal joint size: 2 3 inches 3 Exposed Metal. Clear anodized aluminum, smooth finish SECTION 05810 PAGE 5 EXPANSION JOINT COVER ASSEMBLIES B. Coordinate and furnish anchorages, setting drawings, templates, and instructions for installation of expansion joint cover assemblies to be embedded in or anchored to concrete or to have recesses formed into edges of concrete slab for later placement and grouting -in of frames. C. Fastening to In -Place Construction. Provide anchorage devices and fasteners where necessary to secure expansion joint cover assemblies to in -place construction, including threaded fasteners with drilled -in expansion shields for masonry and concrete where anchoring members are not embedded in concrete. Provide fasteners of metal, type, and size to suit type of construction indicated and provide for secure attachment of expansion joint cover assemblies. A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required to install expansion joint covers. Install joint cover •assemblies in true alignment and proper relationship to expansion joints and adjoining finished surfaces measured from established lines and levels. Allow adequate free movement for thermal expansion and contraction of metal to avoid buckling. Set floor covers at elevations to be flush with adjacent finished floor materials. Locate wall, ceiling, roof, and soffit covers in continuous contact with adjacent surfaces. Securely attach in place with required accessories. Locate anchors at interval recommended by manufacturer, but not less than 3 inches from each end and not more than 24 inches on center B Continuity Maintain continuity of expansion joint cover assemblies with a minimum number of end joints and align metal members mechanically using splice joints. Cut and fit ends to produce joints that will accommodate thermal expansion and contraction of metal to avoid buckling of frames. Adhere flexible filler materials (if any) to frames with adhesive or pressure sensitive tape.as recommended by manufacturer C Extruded Preformed Seals: Install seals complying with manufacturer's instructions and with minimum number of end joints. For straight sections provide preformed seals in continual lengths. Vulcanize or heat -weld field splice joints in preformed seal material to provide watertight joints using procedures recommended by manufacturer Apply adhesive, epoxy or lubricant- adhesive approved by manufacturer to both frame interfaces before installing preformed seal. Seal transitions according to manufacturer's instructions. D Seismic Seals: Install interior seals in continual lengths; vulcanize or heat -weld field splice joints in interior seal material to provide watertight joints using manufacturer's recommended procedures. Install exterior seal in standard lengths. Seal transitions and end joints according to manufacturer's instructions. E. Fire Barriers: Install fire barriers, including transitions and end joints, according to manufacturer's instructions so that fire -rated construction is continuous. A. Do not remove protective covering until finish work in adjacent areas is complete. When protective covering is removed, clean exposed metal surfaces to comply with manufacturer's instructions. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 4 Available Products: a. J10(15)(20) -71-44 by Architectural Art Manufacturing, Inc. b. Others as approved by addendum. B. Expansion Joint Designation EJ -2, Wall to Suspended Ceiling 1 Type: Flush mounted with flexible vinyl insert. 2. Nominal joint size: 2 3 inches 3 Exposed Metal. Clear anodized aluminum, smooth finish 4 Available Products: a. J10(15)(20) -72-44 by Architectural Art Manufacturing, Inc. b Others as approved by addendum. SECTION 05810 PAGE 6 EXPANSION JOINT COVER ASSEMBLIES C. Expansion Joint Designation EJ -3 Gypsum Wall to Wall, Gypsum Ceiling to Ceiling. 1 Type: Flush mounted with flexible vinyl insert. 2. Nominal joint size: 2 3 inches 3 Exposed Metal. Clear anodized aluminum, smooth finish 4 Available Products: a. J10(15)(20) -51-44 by Architectural Art Manufacturing, Inc. b. Others as approved by addendum. D Expansion Joint Designation EJ-4 Gypsum Wall to Wall 1 Type: Flush mounted with floating metal insert. 2. Nominal joint size: 1 inch 3 Exposed Metal. Clear anodized aluminum, smooth finish 4 Available Products: a. 6GW -1 by Balco Metalines b. Others as approved by addendum. E. Expansion Joint Designation EJ -5 Gypsum Wall to Wall 1 Type: Flush mounted with floating metal insert. 2. Nominal joint size: 2 inch 3 Exposed Metal. Clear anodized aluminum, smooth finish 4 Available Products: a. 6GW 2 by Balco Metalines b. Others as approved by addendum. F Expansion Joint Designation EJ-6, Concrete Slab to Concrete Slab 1 Type: Surface mounted with self centering cover 2. Nominal joint size: 2 inch 3 Exposed Metal. Clear anodized aluminum, smooth finish MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 4 Available Products: a. EXB -20 by Balco Metalines b Others as approved by addendum. G. Expansion Joint Designation EJ -7 Concrete Slab to Concrete Slab 1 Type: Surface mounted one side, cast in other side, with pivoting metal insert. 2. Nominal joint size: 1 -2 inch 3 Exposed Metal. Clear anodized aluminum, smooth finish 4 Available Products: a. 6FVTP- (1)(2)E by Balco Metalines b. Others as approved by addendum. H. Fire Blanket Designation FB -1, Shaft Wall 1 Type: Membrane fire barrier 2. Nominal joint size: 1 -8 inch 3 Listing: Warnock Hersey Design No. BMI/EJH 180 -04 4 Available Products: a. 3H SW Series by Balco Metalines b. Others as approved by addendum. Fire Blanket Designation FB -2, Floor 1 Type: Membrane fire barrier 2. Nominal joint size: 1-4 inch 3 Listing: Warnock Hersey Design No. BMI/EJH 120 -08, 09 4 Available Products: a. 2H Series by Balco Metalines b. Others as approved by addendum. J Fire Blanket Designation FB -2, Wall 1 Type: Membrane fire barrier 2. Nominal joint size: 1 12 inch 3 Listing: UL Design No. WW -S -2001 WW -S -2002 4 Available Products: a. 2H Series by Balco Metalines b. Others as approved by addendum. 0 1997 Mahhun Nordfors McKinley Gordon SECTION 05810 PAGE 7 EXPANSION JOINT COVER ASSEMBLIES END OF SECTION 05810 MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Installation of miscellaneous items not installed under other sections. 2. Providing backing as required for a. FOIC items b. Wall hung shelving standards c. Wall hung casework units d. Countertop support locations e. Other items as indicated. f. Electrical or telephone equipment SECTION 06100 PAGE 1 ROUGH CARPENTRY B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 1 Section "Construction Facilities and Temporary Controls" for temporary partitions. 2. Division 6 Section "Finish Carpentry" for non structural carpentry items exposed to view and not specified in another Section. 3 Division 9 Section `Gypsum Board Assemblies' for steel studs where required for backing. 1.3 DEFINITIONS A. Rough carpentry includes carpentry work not specified as part of other Sections and generally not exposed, unless otherwise specified. 1.4 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Divisions 1 Specification Sections. B. Wood treatment data as follows including chemical treatment manufacturer's instructions for handling, storing, installation, and finishing of treated material. 1. For each type of preservative treated wood product include certification by treating plant stating type of preservative solution and pressure process used, net amount of preservative retained, and compliance with applicable standards. 2. For fire retardant treated wood products include certification by treating plant that treated material complies with specified standard and other requirements. 3 Material test reports from qualified independent testing laboratory indicating and interpreting test results relative to compliance of fire retardant- treated wood products with requirements indicated. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS C. Research reports or evaluation reports of the model code organization acceptable to authorities having jurisdiction evidencing compliance of the following wood products with specified requirements and building code in effect for Project. 1 Fire retardant treated wood. 1.5 QUALITY ASSURANCE A. General. Comply with Section 01400 Quality control, Section 01600 Materials and Equipment, and Section 01630 Finish Carpentry B. Regulations: Conform to Section 01065 Code and Permit Requirements. Use of fire- retardant- treated wood for blocking is restricted to rated assemblies, and not allowed in shafts. Refer to UBC Chapter 19 C. Single -Source Responsibility for Fire Retardant Treated Wood. Obtain each type of fire- retardant- treated wood product from one source for both treatment and fire retardant formulation. 1.6 DELIVERY, STORAGE, AND HANDLING A. Keep materials under cover and dry Protect against exposure to weather and contact with damp or wet surfaces. PART 2 PRODUCTS 2.1 BACKING AND BLOCKING 2.3 FASTENERS SECTION 06100 PAGE 2 ROUGH CARPENTRY A. Galvanized Steel Sheet: ASTM A 446, zinc coated according to ASTM A 525 and as follows: 1 Coating Designation. G 60 2. Grade: Grade A, 33 000 psi, minimum yield strength, 20 percent elongation. B. Steel Studs: ASTM C 645 steel studs to match adjacent wall framing construction. 2.2 CONSTRUCTION PANELS FOR PANEL BOARD BACKING A. Plywood Backing Panels: For mounting electrical or telephone equipment, provide fire retardant- treated plywood panels with grade designation, APA C -D PLUGGED EXPOSURE 1, in thickness indicated, or if not otherwise indicated, not less than 15/32 inch. A. General. Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture. B. Nails, Wire, Brads, and Staples: FS FF -N -105 C. Power Driven Fasteners: National Evaluation Report NER -272. D Wood Screws: ANSI B18.6 1 E. Lag Bolts: ANSI B18.2.1 F Bolts: Steel bolts complying with ASTM A 307 Grade A, with ASTM A 563 hex nuts and where indicated, flat washers. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.4 FIRE- RETARDANT TREATMENT BY PRESSURE PROCESS A. General. Where fire- retardant treated wood is indicated, pressure impregnate lumber and plywood with fire- retardant chemicals to comply with AWPA C20 and C27 respectively for treatment type indicated; identify "fire- retardant treated wood" with appropriate classification marking of Underwriters Laboratories, Inc. US. Testing, Timber Products Inspection, Inc. or Other testing and inspecting agency acceptable to authorities having jurisdiction. 1. Current Evaluation/Research Reports: Provide fire retardant- treated wood for which a current model code evaluation/research report exists that is acceptable to authorities having jurisdiction and that evidences compliance of fire- retardant treated wood for application indicated. B. Interior Type A. For interior locations use fire- retardant chemical formulation that produces treated lumber and plywood with the following properties under conditions present after installation. 1 No reduction takes place in bending strength, stiffness, and fastener holding capacities below values published by manufacturer of chemical formulation that are based on tests by a qualified independent testing laboratory of treated wood products identical to those indicated for this Project under elevated temperature and humidity conditions simulating installed conditions. 2. No other form of degradation occurs due to acid hydrolysis or other causes related to manufacture and treatment. 3 No corrosion of metal fasteners results from their contact with treated wood. C. Inspect each piece of treated lumber or plywood after drying and discard damaged or defective pieces. D Available Products: Subject to compliance with requirements, fire retardant treated wood products that may be incorporated in the Work include, but are not limited to, the following: 1 Interior Type A Fire Retardant- Treated Wood. a. "Dricon," Hickson Corporation. b "Pyro Guard," Hoover Treated Wood Products. c. "Flameproof LHC -HTT Osmose Wood Preserving Co, Inc. PART 3- EXECUTION 3.1 INSTALLATION, GENERAL SECTION 06100 PAGE 3 ROUGH CARPENTRY A. Discard units of material with defects that impair quality of rough carpentry construction and that are too small to use in fabricating rough carpentry with minimum joints or optimum joint arrangement. B. Set rough carpentry to required levels and lines, with members plumb and true to line and cut and fitted. C. Fit rough carpentry to other construction; scribe and cope as required for accurate fit. Correlate location of furring, milers, blocking, grounds, and similar supports to allow attachment of other construction. Provide backing secured to studs behind wall finish materials at all wall mounted casework and countertop locations. 1 Provide sheet steel or steel stud backing as appropriate for the weight of the wall mounted item. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 0 1997 Mahlum Nordfors McKinley Gordon SECTION 06100 PAGE 4 ROUGH CARPENTRY D Securely attach rough carpentry work to substrate by anchoring and fastening as indicated. E. Countersink nail heads on exposed carpentry work and fill holes. F Use common wire nails, unless otherwise indicated. Use finishing nails for finish work. Select fasteners of size that will not penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting of wood; pre-drill as required. END OF SECTION 06100 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Interior standing and running trim, chair rails, and handrails. 1.3 SUBMITTALS 1.4 QUALITY ASSURANCE 1.5 DELIVERY, STORAGE, AND HANDLING SECTION 06200 PAGE 1 FINISH CARPENTRY B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 6 Section "Rough Carpentry" for furring, blocking, and other carpentry work that is not exposed to view 2. Division 10 Section `Wall Surface Protection Systems' for bumper inserts in handrails. A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of factory- fabricated product and process specified, including details of construction relative to materials, dimensions of individual components, profiles, textures, and colors. C. Samples for initial selection purposes in the form of manufacturer's color charts consisting of actual units or sections of units showing full range of colors, textures, and patterns available for each type of material indicated. A. Installer Qualifications: Arrange for installation of finish carpentry by a firm that can demonstrate successful experience in installing finish carpentry items similar in type and quality to those required for this Project. B. Standards: Comply with the quality standards established in Parts 200 and 300 of the Architectural Woodwork Institute Quality Standards, Guide Specifications, and Quality Certification Program Guidebook, latest edition, hereinafter referred to as AWI 'Quality Standards.' A. Delivery and Storage: Keep materials under cover and dry Protect against exposure to weather and contact with damp or wet surfaces. B Do not deliver interior finish carpentry until environmental conditions meet requirements specified for installation areas. If finish carpentry must be stored in other than installation areas, store only in areas where environmental conditions meet requirements specified for installation areas. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 PROJECT CONDITIONS SECTION 06200 PAGE 2 FINISH CARPENTRY A. Environmental Conditions: Obtain and comply with finish carpentry manufacturer's and installer's coordinated advice for optimum temperature and humidity conditions for finish carpentry during its storage and installation. PART 2 PRODUCTS 2.1 MATERIALS, GENERAL A. Lumber Standards: Comply with PS 20 "American Softwood Lumber Standard" for lumber and with applicable grading rules of inspection agencies certified by American Lumber Standards Committee Board of Review B. Inspection and Grading Agencies: Inspection and grading agencies and the abbreviations used to reference them with lumber grades and species include the following: 1 WWPA Western Wood Products Association. 2. AWI Architectural Woodwork Institute. C. Hardwood Plywood. Comply with HPVA HP -1, "Interim Voluntary Standard for Hardwood and Decorative Plywood." D Particleboard: ANSI A208.1, Grade M -2 made with phenol formaldehyde resins. E. Fire Retardant Particleboard Core: Medium Density Industrial Particleboard treated with fire retardant. 1 Rating: UL Class 1 fire rating 2. Flame Spread: 20 3 Smoke developed. 25- 2.2 INTERIOR STANDING AND RUNNING TRIM AND RAILS A. Hardwood Trim. Provide finished hardwood lumber and moldings complying with the following requirements: 1 Species: Select White Hard Maple; AWI 100 -S -1 Grade II. 2. Texture: Surfaced (smooth). 3 Lumber for Transparent Finish (Stained or Clear) Solid lumber stock. B. Wood Molding Patterns: Provide stock moldings made to patterns included in WMMPA WM 7 and graded under WMMPA WM 4 1 Chair Rail. WM 297 2. Moldings for Transparent Finish. N- Grade. 2.3 HANDRAILS A. Interior Railings Clear, kiln -dried railing stock of pattern indicated, either solid or laminated. 1 Species: Hard maple. MAHLUM NORDFORS McIC NNLEY GORDON OLYMPIC MEMORIAL HOSPTTAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.4 MISCELLANEOUS MATERIALS SECTION 06200 PAGE 3 FINISH CARPENTRY A. Fasteners for Interior Finish Carpentry Nails, screws, and other anchoring devices of type, size, material, and finish required for application indicated to provide secure attachment, concealed where possible. 1. Countersink nails, fill surface flush, (match wood color and grain), and sand where face nailing is unavoidable. 2. Where finish carpentry materials are exposed in areas of high humidity provide fasteners and anchorages with hot -dip galvanized coating complying with ASTM A 153 B. Paneling Adhesives: Comply with paneling manufacturer's recommendations for adhesives. 2.5 FABRICATION A. General. Conform to unless otherwise shown or specified. 1 Standing and Running Trim. AWI 'Quality Standards' 300 -S -1 'Custom Grade' B. Wood Moisture Content: Comply with requirements of specified inspection agencies and manufacturer's recommendations for moisture content of finish carpentry in relation to relative humidity conditions existing during time of fabrication and in installation areas. Provide finish carpentry with moisture content that is compatible with Project requirements. C. Fabricate finish carpentry to dimensions, profiles, and details indicated. 1 Ease edges of lumber less than 1 inch in nominal thickness to 1/16 inch radius. 2. Ease edges of lumber 1 inch or more in nominal thickness to 1/8 inch radius. PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates for compliance with requirements for installation tolerances and other conditions affecting installation and performance of finish carpentry Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean substrates of projections and substances detrimental to application. B. Condition finish carpentry to average prevailing humidity conditions in installation areas before installation for a minimum of 24 hours unless longer conditioning recommended by manufacturer 3.3 INSTALLATION, GENERAL A. Do not use finish carpentry materials that are unsound, warped, bowed, twisted, improperly treated or finished, not adequately seasoned, or too small to fabricate with proper jointing arrangements. B. Install finish carpentry plumb, level, true, and aligned with adjacent materials. Use concealed shims where required for alignment. 1 Scribe and cut finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 STANDING AND RUNNING TRIM AND RAILS SECTION 06200 PAGE 4 FINISH CARPENTRY 2. Install to tolerance of 1/8 inch in 8 feet for plumb and level. Install adjoining finish carpentry with 1/16 inch maximum offset for flush installation and 1/8 inch maximum offset for reveal installation. 3 Coordinate finish carpentry with materials and systems that may be in or adjacent to standing and running trim and rails. Provide cutouts for mechanical and electrical items •that penetrate exposed surfaces of trim and rails. C. Finish in accordance with specified requirements. A. Install with minimum number of joints practical, using full- length pieces from maximum lengths of lumber available. Stagger joints in adjacent and related standing and running trim and rails. Cope at returns and miter at comers to produce tight- fitting joints with full- surface contact throughout length of joint. Use serf joints for end to-end joints. Plane back of casings to provide uniform thickness across joints if required. 1 Match color and grain pattern across joints. 2. Install trim after drywall joint finishing operations and installation of wall finish are completed. 3 Drill pilot holes in hardwood prior to nailing or fastening to prevent splitting. Fasten to prevent movement or warping. Countersink nail heads on exposed carpentry work and fill holes. 3.5 HANDRAIL INSTALLATION A. Secure handrails with metal brackets. Assemble handrails at easements and splices with rail bolts and glue. 3.6 ADJUSTING A. Repair damaged or defective finish carpentry where possible to eliminate functional or visual defects. Where not possible to repair, replace finish carpentry Adjust joinery for uniform appearance. 3.7 CLEANING A. Clean finish carpentry on exposed and semi exposed surfaces. Touch up factory- applied finishes to restore damaged or soiled areas. 3.8 PROTECTION A. Provide final protection and maintain conditions that ensure finish carpentry is without damage or deterioration at time of Substantial Completion. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 06200 MAHLUM NORDFORS McKLNLEY GORDON SECTION 06402 PAGE 1 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCM '1'ECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Laminate clad cabinets (plastic covered casework). 2. Wood veneer faced cabinets 3 Cabinet tops (countertops). 4 Cabinet hardware and locks 5 Miscellaneous items incidental to or necessary for a sound, secure, and complete installation. 6 Cutout, borings, access panels, grommets, and other preparations required for installation of and access to mechanical and electrical items on or in cabinets. 7 Full height adjustable shelving. 8. Relaminating of existing cabinets. B Related Sections: The following sections contain requirements that relate to this section. 1 Division 6 Section "Rough Carpentry" for furring, blocking, and other carpentry work that is not exposed to view 2. Division 6 Section 'Finish Carpentry" for carpentry exposed to view that is not specified in this section. 3 Division 8 Section 'Flush Wood Doors" for doors specified by reference to architectural woodwork standards. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of product and process specified in this section and incorporated into items of architectural woodwork during fabrication, finishing, and installation. C. Shop drawings showing location of each item, dimensioned plans and elevations, large -scale details, attachment devices, and other components. Show materials, laminate colors, sinks, fittings, hardware, and other accessories. Show sink centerlines. D Samples for verification purposes of the following: 1 Laminate clad panel products, 8 -1/2 inches, by 11 inches for each type, color, pattern, and surface finish, with separate samples of unfaced panel product used for core. 2. Wood veneer faced products, 8 -1/2 inches, by 11 inches for each species, color, and surface finish 3 Corner pieces as follows: MAHLUM NORDFORS MCKINLEY GORDON SECTION 06402 PAGE 2 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCHITECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK a. Cabinet front frame joints between stiles and rail as well as exposed end pieces, 18 inches high by 18 inches wide by 6 inches deep. 1 b. Miter joints for standing trim. 4 Exposed cabinet hardware, one unit of each type and finish. E. Product certificates signed by woodwork manufacturer certifying that products comply with specified requirements. F Qualification data for firms and persons specified in "Quality Assurance" article to demonstrate their capabilities and experience. Include list of completed projects with project names, addresses, names of Architects and Owners, and other information specified. 1.4 QUALITY ASSURANCE A. Manufacturer Qualifications: Firm experienced in successfully producing architectural woodwork similar to that indicated for this Project, with sufficient production capacity to produce required units without causing delay in the Work. Subject to specified requirements, provide architectural woodwork by one of the following: 1 Lyline 2. Lemons 3 Westmark 4 Master Millwork, Inc. 5 Cabinetmakers, Inc. 6 Northwestern Design, Inc. 7 Hillstrom Cabinets. 8. Ritter Cabinets 9 Old Time Woodwork, Inc. 10 Riverside Millwork, Inc. B. Single -Source Manufacturing and Installation Responsibility Engage a qualified Manufacturer to assume undivided responsibility for woodwork specified in this section, including fabrication, finishing, and installation. C. AWI Quality Standard. Comply with applicable requirements of "Architectural Woodwork Quality Standards" published by the Architectural Woodwork Institute (AWI) except as otherwise indicated. 1.5 DELIVERY STORAGE, AND HANDLING A. Protect woodwork during transit, delivery storage, and handling to prevent damage, soilage, and deterioration. B. Do not deliver woodwork until painting, wet work, grinding, and similar operations that could damage, soil, or deteriorate woodwork have been completed in installation areas. If woodwork must be stored in other than installation areas, store only in areas whose environmental conditions meet requirements specified in "Project Conditions." 1.6 PROJECT CONDITIONS A. Environmental Conditions: Obtain and comply with Woodwork Manufacturer's and Installer's coordinated advice for optimum temperature and humidity conditions for woodwork during its MAHLUM NORDFORS McIINNLEY GORDON SECTION 06402 PAGE 3 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCHITECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK storage and installation. Do not install woodwork until these conditions have been attained and stabilized so that woodwork is within plus or minus 10 percent of optimum moisture content from date of installation through remainder of construction period. B Field Measurements: Where woodwork is indicated to be fitted to other construction, check actual dimensions of other construction by accurate field measurements before manufacturing woodwork; show recorded measurements on final shop drawings. Coordinate manufacturing schedule with construction progress to avoid delay of Work. 1. Verify locations of concealed framing, blocking, reinforcements, and furring that support woodwork by accurate field measurements before being enclosed. Record measurements on final shop drawings. 2. Where field measurements cannot be made without delaying the work, guarantee dimensions and proceed with manufacture of woodwork without field measurements. Provide allowance for trimming at site and coordinate construction to ensure that actual dimensions correspond to guaranteed dimensions. PART 2- PRODUCTS 2.1 HIGH PRESSURE DECORATIVE LAMINATE MANUFACTURERS A. Manufacturer Subject to compliance with requirements, and colors specified in Room Finish Schedule, provide high pressure decorative laminates of one of the following: 1. Formica Corp. 2. Laminart. 3 Micarta Div Westinghouse Electric Corp. 4 Nevamar Corp. 5 Wilsonart 6 Wilsonart Chemsurf 7 Pionite 2.2 MATERIALS A. General. Provide materials that comply with requirements of the AWI woodworking standard for each type of woodwork and quality grade indicated and, where the following products are part of woodwork, with requirements of the referenced product standards, that apply to product characteristics indicated: 1 Hardboard. ANSI/AHA A135 4 2. High Pressure Laminate: NEMA LD 3 3 Medium Density Fiberboard: ANSI A208.2. 4 Particleboard. ANSI A208.1 5 Softwood Plywood: PS 1. 6 Formaldehyde Emission Levels: Comply with formaldehyde emission requirements of each voluntary standard referenced below a. Particleboard: NPA 8. b Medium Density Fiberboard. NPA 9 c. Hardwood Plywood. HPMA FE. MAHLUM NORDFORS MCKINLEY GORDON SECTION 06402 PAGE 4 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCHITECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK 2.3 FABRICATION, GENERAL A. Wood Moisture Content: Comply with requirements of referenced quality standard for moisture content of lumber in relation to relative humidity conditions existing during time of fabrication and in installation areas. B. Fabricate woodwork to dimensions, profiles, and details indicated. Ease edges to radius indicated for the following: 1. Corners of cabinets and edges of solid wood (lumber) members less than 1 inch in nominal thickness: 1/16 inch. 2. Edges of rails and similar members more than 1 inch in nominal thickness: 1/8 inch. C. Complete fabrication, including assembly finishing, and hardware application, before shipment to project site to maximum extent possible. Disassemble components only as necessary for shipment and installation. Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting. D Factory-cut openings; to maximum extent possible, to receive hardware, appliances, plumbing fixtures, electrical work, and similar items. Field cutting of sink and grommet cutouts allowed. Locate openings accurately and use templates or roughing -in diagrams to produce accurately sized and shaped openings. Smooth edges of cutouts and, where located in countertops and similar exposures, seal edges of cutouts with a water resistant coating. E. Edges of Laminated Components: GP -50, 0 050 -inch thick laminate, color to match component, bonded to the core of the board with a waterproof hot melt adhesive for all drawers, doors, end panels, including the tops of tall and wall cabinets, the bottom of all cabinets, and the back of any exposed end panels. All other exposed edges shall be GP -28, 0 028 -inch thick laminate. F Stainless Steel. Stainless steel shall be 18 gage, type 316, with No. 4 satin finish, unless otherwise indicated. 2.4 LAMINATE CLAD CABINETS (PLASTIC COVERED CASEWORK) A. Quality Standard: Comply with AWI Section 400 and its Division 400B 'Laminate Clad Cabinets. B Grade: Custom. C. AWI Type of Cabinet Construction. Reveal overlay D Laminate Cladding: High pressure decorative laminate complying with the following requirements: 1. Colors, Patterns, and Finishes: Refer to Room Finish Schedule in Project Drawings. 2. Laminate Grade for Exposed Surfaces: Provide laminate cladding complying with the following requirements for type of surface and grade. a. Horizontal Surfaces Other Than Tops: GP -50 (0 050 -inch nominal thickness). b. Postformed Surfaces: PF-42 (0 042 -inch nominal thickness). c. Vertical Surfaces: GP -28 (0 028 -inch nominal thickness). d. Edges: GP -50 (0 050 -inch nominal thickness). 3 Semi exposed Surfaces: Provide surface materials indicated below. MAHLUM NORDFORS McKINLEY GORDON SECTION 06402 PAGE 5 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCHITECTURAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS WOODWORK a. High pressure laminate, CL -20. E. Chemical Resistant, High- Pressure Decorative Laminate: NEMA LD 3 Grade PF-42, and as follows: 1 Laminate has the following ratings when tested with indicated reagents according to NEMA LD 3 test procedure 3 9.5 a. Nitric acid (30 percent)• moderate effect. b. Sulfuric acid (77 percent): moderate effect. c. Hydrochloric acid (37 percent): moderate effect. d. Phosphoric acid (75 percent): no effect. e. Acetic acid (98 percent): no effect. f. Carbon tetrachloride: no effect. g. Formaldehyde: no effect. h. Ethyl acetate: no effect. i. Ethyl ether no effect. j. Phenol (85 percent): moderate effect. k. Benzene: no effect. 1. Xylene: no effect. m. Butyl alcohol. no effect. n. Furfural. no effect. o. Methyl ethyl ketone: no effect. p. Sodium hydroxide (25 percent). no effect. q. Sodium sulfide (15 percent) no effect. r Ammonium hydroxide (28 percent) no effect. s. Zinc chloride: no effect. t. Gentian violet: no effect. u. Methyl red: no effect. 2. Products: Subject to compliance with requirements, provide one of the following: a. Lab Grade 840 Black; Formica Corporation. b. Pionite Chemguard; Pioneer Plastics Corp. c. Chemsurf; Ralph Wilson Plastics Co. 2.5 WOOD VENEER FACED CABINETS A. Quality Standard. Comply with AWI Section 400 and its Division 400A "Wood Cabinets." B. Grade: Custom. C. AWI Type of Cabinet Construction. Reveal overlay D Wood Species for Wood Veneer Plain Sliced Natural Northern Maple. 1 Grain Matching: Run and match grain vertically across drawer fronts, doors, and fixed panels. MAHLUM NORDFORS MCKINLEY GORDON SECTION 06402 PAGE 6 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCM '1'ECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK 2. Select for color rather than grain. 3 Effect: Filled finish 4 Sheen: Satin Medium rubbed effect 2.6 CABINET HARDWARE AND ACCESSORY MATERIALS 1 A. General. Provide cabinet hardware and accessory materials associated with architectural cabinets, except for items specified in Division 8 Section "Finish Hardware." Locks, if required, shall be furnished at locations shown on architectural drawings. All hardware will be architectural woodwork manufacturer's standard but shall meet the following requirements: 1 Hinges shall be concealed dull chrome 2 -3/4 inch fixed pin, five knuckle, 270 degree swing, hospital type. 2. Drawer and door pulls shall be through bolted from back side; US28 Satin Aluminum wire type clear anodized, 4" center to center, 1- 3/16" projection, 5/16" diameter, no escutcheons. 3 Drawer slides shall meet the following minimum standards and shall consist of cold rolled steel, zinc plated, ball bearing rollers, or ABS self lubricating slides: a. Typical drawers: Load rating of 75 pounds. b. File cabinet and paper storage drawers: Load rating of 100 pounds full extension. All file drawers to extend to allow 1" clearance between files and face of cabinet. 4 Cabinet mounted adjustable shelf support clips shall be provided as follows: a. Each shelf shall have 5 mm nickel plated steel, plug -in, retainer type support clips let into shelf bottoms to prevent sliding. b. Drill shelf clip holes at 1 -1/4 inch on center, full height of cabinet, two columns per cabinet side. c. Provide four support clips at each shelf indicated, six at shelves over 42 inches in length. 5 For concealed hardware provide manufacturer's standard finish that complies with product class requirements of ANSI/BHMA A156.9 6 Catching devices shall be heavy -duty magnetic with a maximum 5 lb. minimum 3 lb. pull. 7 Locks shall be Schlage 46 -002 6 inch type, National, or approved equal. US26D finish Provide locks at cabinets where shown. 8. Clothes rods at wardrobe unite less than 24 inches deep shall be Knape Vogt Clothing Carrier K1 -16 B. Drawer Construction. Comply with specified AWI standards for drawer construction. C. Closure and Filler Panels: Provide closure panels, soffits, sloped tops, and filler panels as shown on drawings. Finish surface to match adjacent cabinets. Provide all support as required. Extend closure panels 6 inches above finish ceiling where ceilings are shown to stop at face of cabinet. D Provide 4 -inch high backsplash at back and sides of all countertops, unless noted otherwise. E. Countertop Supports: Provide countertop supports spaced per manufacturer's recommendations. Support to be angle brace A901 as manufactured by Westmark or similar MAHLUM NORDFORS McKINLEY GORDON SECTION 06402 PAGE 7 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCHITECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK F Keyboard Shelf: Provide slide -out keyboard trays at locations shown on drawings. G. Grommeted Cord Drops: Provide and install up to one (1) manufacturer's standard 3" nominal grommets for electrical cord drops through countertops and/or cabinets for each eight (8) linear feet of countertop. Install at all locations directed by Owner after Owner occupancy and before final completion. Submit color samples to Architect for selection. 2.7 ARCHITECTURAL CABINET TOPS (COUNTERTOPS) A. Quality Standard: Comply with AWI Section 400 and its Division 400C. B. Standard Top: High pressure decorative laminate top complying with the following: 1 AWI Grade: Custom. a. Color, pattern, and finish. Refer to Room Finish Schedule in Project Drawings. b. Grade: GP -50 (0 050 -inch nominal thickness). 2. Edge Treatment: Same as laminate cladding on horizontal surfaces. C. Chemical Resistant Top: Post Formed High pressure decorative laminate top complying with the following: 1 AWI Grade: Custom. a. Color pattern, and finish. Refer to Room Finish Schedule in Project Drawings. b Grade: Intermediate Laboratory grade 0 036 inch thick. 2. Edge Treatment: Same as laminate cladding on horizontal surfaces, formed with heat and pressure over front edge and up backsplash. 2.8 ADJUSTABLE SHELVING A. General. Provide adjustable shelves and standards as indicated on project drawings. B Shelf Construction. Comply with AWI Section 400 Division 400 C. 1 Shelves to be 3/4 inch thick with plastic laminate finish on all sides. C. Standards and Brackets 1 Wall- Mounted adjustable shelf supports shall be provided as follows: a. Surface- mounted aluminum standards with vertical slots. 72 inch length unless noted otherwise. Provide standards at 36 inches on center maximum. Provide solid backing in wall. b. Provide shelf brackets for each shelf indicated. c. 2.9 FASTENERS AND ANCHORS Quality standard product No. 186ANO as manufactured by Knape Vogt. A. Screws: Select material, type, size, and finish required for each use. Comply with FS FF -S -111 for applicable requirements. B For metal framing supports, provide screws as recommended by metal framing manufacturer C. Nails: Select material, type, size, and finish required for each use. Comply with FS FF -N -105 for applicable requirements. MAHLUM NORDFORS McIONLEY GORDON SECTION 06402 PAGE 8 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCHITECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK D Anchors: Select material, type, size, and finish required by each substrate for secure anchorage. Provide nonferrous metal or hot -dip galvanized anchors and inserts on inside face of exterior walls and elsewhere as required for corrosion resistance. Provide toothed steel or lead expansion bolt devices for drilled -in -place anchors. Furnish inserts and anchors, as required, to be set into concrete or masonry work for subsequent woodwork anchorage. PART 3- EXECUTION 3.1 PREPARATION A. Condition woodwork to average prevailing humidity conditions in installation areas before installing. B. Deliver concrete inserts and similar anchoring devices to be built into substrates well in advance of time substrates are to be built. Verify that blocking and backings have been installed at appropriate locations for anchorage. C. Before installing architectural woodwork, examine shop fabricated work for completion and complete work as required, including back priming and removal of packing. D Measure all areas for scribe fit. 3.2 INSTALLATION A. Quality Standard Install woodwork to comply with AWI Section 1700 for same grade specified in Part 2 of this section for type of woodwork involved. B. Install woodwork plumb, level, true, and straight with no distortions. Shim as required with concealed shims. Install to a tolerance of 1/8 inch in 8' -0" for plumb and level (including tops) and with no variations in flushness of adjoining surfaces. C. Scribe and cut woodwork to fit adjoining work and refinish cut surfaces or repair damaged finish at cuts. D Anchor woodwork to anchors or blocking built in or directly attached to substrates. Secure to grounds, stripping and blocking with countersunk, concealed fasteners and blind nailing as required for a complete installation. Except where prefinished matching fastener heads are required, use fine finishing nails for exposed nailing, countersunk and filled flush with woodwork and matching final finish where transparent finish is indicated. E. Cabinets: Install without distortion so that doors and drawers fit openings properly and are accurately aligned. Adjust hardware to center doors and drawers in openings and to provide unencumbered operation. Complete the installation of hardware and accessory items as indicated. F Tops: Anchor securely to base units and other support systems as indicated. G. Sinks: Verify sink locations and sizes before cutting openings in countertops. H. Complete the finishing work specified in this section to whatever extent not completed at shop or before installation of woodwork. MAHLUM NORDFORS McKINLEY GORDON SECTION 06402 PAGE 9 OLYMPIC MEMORIAL HOSPITAL INTERIOR ARCHITECTURAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS WOODWORK 3.3 ADJUSTMENT AND CLEANING A. Repair damaged and defective woodwork where possible to eliminate defects functionally and visually where not possible to repair, replace woodwork. Adjust joinery for uniform appearance. B. Clean, lubricate, and adjust hardware. C. Clean woodwork on exposed and semi exposed surfaces. Touch up factory applied finishes to restore damaged or soiled areas. 3.4 PROTECTION A. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and Installer that ensures that woodwork is being without damage or deterioration at time of Substantial Completion. 3.5 SCHEDULE A. General. Provide custom and prefabricated casework at locations as indicated on project drawings. Include all hardware and accessories required for a complete installation. B. Provide post- formed countertops at countertop locations in Surgery Pathology Clean-up, Sub Sterile and Sterile rooms. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 06402 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 06650 PAGE 1 SOLID SURFACE WALL PANELS A. Drawings and general provisions of the Contract, including General and Supplementary c onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Solid surface wall panels for showers 2. Cement backer board substrate for showers B. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 9 Section "Gypsum Wallboard Assemblies" interior wall framing 2. Division 9 Section "Painting" for priming wall surfaces. 1.3 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B Product Data for each type of product specified. Include data on physical characteristics, durability fade resistance, and flame resistance characteristics. C. Shop Drawings showing details of each application. Indicate seams and termination points. D Samples for initial selection showing the full range of colors, textures, and patterns available. E. Schedule of solid surfacing using same room designations indicated on Drawings. F Maintenance data for solid surface wall panels to include in the operation and maintenance manual specified in Division 1 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer who has completed 5 projects similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance. B. Fire- Test Response Characteristics: Provide solid surface wall panels with the following surface- burning characteristics as determined by testing identical products per ASTM E 84 by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. 1 Flame Spread: 25 or less. 2. Smoke Developed: 450 or less. 3 Class 1 Rating 1.5 PROJECT CONDITIONS A. Space Enclosure and Environmental Limitations: Do not install solid surface wall panels until space is enclosed and weatherproof, wet -work in space is completed and nominally dry work above ceilings is complete, and ambient temperature and humidity conditions are and will be continuously maintained at values near those indicated for final occupancy MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS B. Lighting: Do not install solid surface wall panels until a lighting level of not less than 15 foot candles (160 lux) is provided on the surfaces to receive wall covering. C. Ventilation: Provide continuous ventilation during installation and for not less than the time recommended by the solid surface wall panels manufacturer for full drying or curing. 4- PART2- PRODUCTS 2.1 MATERIAL A. Composition. Homogenous, non porous polyester or modified acrylic panel product. B. Thickness: nominal 1/2 inch. C. Available Products: Subject to compliance with requirements, solid surface wall panels that may be incorporated into the Work include, but are not limited to, the following: 1 Corian 2. Formica Surell 3 Swanstone 4 VT Industries DURAllure 5 Avonite 2.2 ADHESIVES SECTION 06650 PAGE 2 SOLID SURFACE WALL PANELS A. General. Mildew- resistant, nonstaining adhesive as recommended by solid surface wall panel manufacturer 2.3 JOINT SEALANTS A. General. Silicone based sealant approved by manufacturer B. Available Products: Subject to compliance with requirements, backer boards that may be incorporated into the Work include, but are not limited to, the following: 1 DuPont Joint Adhesive for Corian 2. Others as approved by addendum. 2.4 BACKER BOARD A. General. Portland cement based, glass fiber mesh reinforced board. B. Available Products: Subject to compliance with requirements, backer boards that may be incorporated into the Work include, but are not limited to, the following: 1 USG Durock 2. Others as approved by addendum. PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates for compliance with requirements for moisture content and other conditions affecting performance of Work of this Section. Do not proceed with installation until unsatisfactory conditions have been corrected. MAHLUM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.2 PREPARATION A. Comply with manufacturer's written instructions for surface preparation. 3.3 INSTALLATION, GENERAL 0 1997 Mahhun Nordfors McKinley Gordon SECTION 06650 PAGE 3 SOLID SURFACE WALL PANELS B. Clean substrates of substances that could impair wall covering's bond, including mold, mildew oil, grease, incompatible primers, and dirt. C. Precondition the substrate to the temperature and humidity levels recommended by the solid surface wall panel manufacturer A. General. Comply with solid surface wall panel manufacturers' written installation instructions applicable to products and applications indicated, except where more stringent requirements apply B. Install seams vertical and plumb at least 6 inches (150 mm) from outside comers and 3 inches (75 mm) from inside corners. No horizontal. seams. C. Trim edges for color uniformity pattern match, and tight closure at seams and edges. Butt seams. D Seal seams completely with color matching joint sealant. 3.4 CLEANING A. Remove excess adhesive at finished seams, perimeter edges, and adjacent surfaces. B Use cleaning methods recommended by solid surface wall panel manufacturer END OF SECTION 06650 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- G}NERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Cementitious crystalline waterproofing treatment of concrete structures. B Related Sections: The following Sections contain requirements that relate to this Section: 1 Division 3 Section "Cast -in -Place Concrete" for concrete placement, curing, and finishing. 2. Division 5 Section "Expansion Joint Cover Assemblies' for expansion joint cover assemblies and installation. 3 Division 7 Section "Hot Fluid Applied Waterproofing" for rubberized asphalt type waterproof membranes. 4 Division 7 Section "Joint Sealants" for joint sealant materials and installation. 1.3 SUBMITTALS 1.4 QUALITY ASSURANCE SECTION 07100 PAGE 1 CONCRETE SEALERS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for each type of waterproofing specified, including manufacturer's printed instructions for evaluating, preparing, and treating the substrate, technical data, and tested physical and performance properties. A. Installer Qualifications: Engage an experienced Installer who has completed similar waterproofing to that indicated for this Project and who is acceptable to waterproofing manufacturer B. Single Source Responsibility. Obtain waterproofing materials from a single manufacturer regularly engaged in manufacturing waterproofing. 1.5 DELIVERY STORAGE, AND HANDLING A. Deliver materials to Project site in original containers with seals unbroken, labeled with manufacturer's name, product brand name and type, date of manufacture, shelf life, and directions for storing and mixing with other components. B. Store materials in their original undamaged containers in a clean, dry protected location and within the temperature range required by waterproofing manufacturer Protect stored materials from direct sunlight. C. Remove and replace material that cannot be applied within its stated shelf life. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 PROJECT CONDITIONS A. Environmental Limitations: Apply waterproofing within the range of ambient and substrate temperatures recommended by Waterproofing manufacturer B. Maintain adequate ventilation during application and through complete curing of water*oofing materials. PART 2- PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: 1 Cementitious Crystalline Waterproofing: a. Xypex, Xypex Chemical Corporation, (604) 273 -5265 b. Others as approved by addendum 2.2 WATERPROOFING MATERIALS A. General. Provide waterproofing materials recommended by manufacturer to be fully compatible with and able to develop bond to substrate under conditions of service and application required, as demonstrated by waterproofing manufacturer based on testing and field experience. 1 Compound waterproofing for vertical or horizontal application and slope of substrate indicated. PART 3 EXECUTION 3.1 EXAMINATION 3.2 SURFACE PREPARATION A. Examine substrates, areas, and conditions under which waterproofing systems will be applied, with Installer present, for compliance with requirements. Do not proceed with installation until unsatisfactory conditions have been corrected. 1 Notify Architect in writing of anticipated problems using waterproofing over substrate. A. Clean and prepare substrate according to manufacturer's recommendations. Ensure that concrete surfaces have an open capillary system to provide tooth and suction, and are clean; free from scale, excess form oil, laitance, curing compounds and any other foreign matter B. Wash any smooth surfaces caused by forms, or surfaces covered with excess form oil or other contaminants, and lightly sandblast, waterblast, or acid -etch with muriatic acid to provide a clean absorbent surface. 3.3 JOINT AND CRACK TREATMENT SECTION 07100 PAGE 2 CONCRETE SEALERS A. Prepare, treat, rout, and fill joints and cracks in substrate according to ASTM C 898 and waterproofing manufacturer's recommendations. Remove dust and dirt from joints and cracks complying with ASTM D 4258 prior to coating surfaces. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 WATERPROOFING APPLICATION B. Mixing: Mix materials according to manufacturer's instructions. SECTION 07100 PAGE 3 CONCRETE SEALERS A. General. Apply waterproofing according to manufacturer's recommendations. Apply waterproofing to green concrete as soon as possible after forms have been stripped, or to existing concrete which has been thoroughly saturated with clean water Surfaces to be treated shall be moistened prior to application, as required to insure proper migration of crystalline Chemicals into the capillary voids in the concrete. Remove free water prior to treatment. C. Application. Apply waterproofing, according to manufacturer's recommendations, by using a semi -stiff short bristle brush or broom to work the waterproofing well into the surface of the concrete, filling all hairline cracks and surface pores. 3.5 CURING, PROTECTING, AND CLEANING A. Begin curing as soon as the waterproofing materials have set up sufficiently so as not to be damaged by a fine spray Fog spray treated surfaces treated surfaces three times a day for a two day period, or cover the treated areas with damp burlap for the same prescribed period. Do not lay plastic sheeting directly on the treated surfaces during the curing period. B. Protect treated surfaces from damage due to wind, sun, rain, and temperatures below 36 degrees F for a period of not less than 48 hours after application. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 07100 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 1 -part modified polyurethane membrane system. 1.3 SUBMITTALS SECTION 07120 PAGE 1 FLUID APPLIED WATERPROOFING B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 3 Section `Cast -In -Place Concrete. 2. Division 7 Section `Building Insulation' for rigid insulation panels. A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of fluid applied waterproofing specified, including data substantiating that materials comply with specified requirements. C. Samples, 3 inches by 6 inches minimum size, of each fluid- applied waterproofing material specified for Project. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed fluid applied waterproofing applications similar in material, design, and extent to that indicated for Project and that has resulted in construction with a record of successful in- service performance. Single -Source Responsibility Obtain primary waterproofing materials of each type required from a single manufacturer 1.5 DELIVERY STORAGE, AND HANDLING A. Deliver primary waterproofing materials to job site in manufacturer's original, unopened containers, bearing•manufacturer's name and label and the following information. 1 Product name. 2. Product description (generic product classification). 3 Batch number under which product was produced. 4 National standards with which the product complies. 5 Application instructions. 1.6 PROJECT CONDITIONS A. Substrate: Proceed with waterproofing operations only after substrate construction and penetrating work have been completed. MAHLUM NORDFORS MCKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS B. Weather Proceed with waterproofing operations only when existing and forecast weather conditions will permit work to be performed in accordance with manufacturer's recommendations. PART 2- PRODUCTS 2.1 MATERIALS, GENERAL A. General Compatibility Provide products that are recommended by manufacturer to be fully compatible with indicated substrates, including modification by bituminous additives (asphalt or coal tar as needed) and similar proven compounding provisions. 2.2 POLYURETHANE- BASED, 1- COMPONENT WATERPROOFING A. Single- component, bitumen modified, polyurethane based liquid membrane material, self bonding to substrates, and compounded specifically for application and slope of substrate indicated. Provide membrane with not less than 90 percent solids, minimum 6 -month shelf life in uncured state, and tested by manufacturer to comply with requirements of ASTM C 836 B Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: 1 "One -Kote System W 1" Karnak Corporation. 2. "Vulkem 201 Mameco International, Inc. 3 "Perma -Guard (No. 7410 Series)" The Neogard Corporation. 4 `Elasto -Deck B.T Pacific Polymers, Inc. 5 'Duramem H -500/V -500' Pecora Corporation. 6 'HLM 5000 Sonneborn Building Products. 7 "Tremproof 60 Tremco, Inc. 2.3 MISCELLANEOUS MATERIALS SECTION 07120 PAGE 2 FLUID- APPLIED WATERPROOFING A. In addition to primary waterproofing materials, provide the following: 1 Primer/Filler/Sealer As recommended by manufacturer of fluid applied waterproofing compound. 2. Flashings, Cant Strips, and Accessories: As recommended by manufacturer of waterproofing compound. 3 Protection Course: Premolded, 1/8- inch thick, semirigid board consisting of mineral- stabilized asphalt core sandwiched between layers of asphalt- saturated felt, surface coated with asphalt and sealed to core under heat and pressure, and provided with polyethylene film facings. a. Available Products: Subject to compliance with requirements, products that may be incorporated in the work include, but are not limited to, the following: 1) "Ram -Tough Protection Board" The Barrett Company 2) "PC 2 Protection Course" W.R Meadows, Inc. 3) "Protection Sheet". Pecora Corp. 4) "Protection Course II" Sonneborn Bldg. Products. 5) "Tremboard Tremco, Inc. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3- EXECUT!ON 3.1 PREPARATION OF SUBSTRATE A. Clean substrate of projections and substances detrimental to work; comply with instructions of prime materials manufacturer B. Install cant strips and similar accessories as shown and as recommended by prime materials manufacturer even though not shown. C. Fill voids, seal joints, and apply bond breakers as recommended by prime materials manufacturer D Prime substrate as recommended by prime materials manufacturer 3.2 INSTALLATION A. General. Comply with manufacturer's written installation recommendations, including preparation of substrate surfaces, detail coatings of joints and planar changes in substrate, and priming of substrates. B. Apply waterproofing membrane material to substrates and adjoining surfaces indicated to receive membrane. Apply in accordance with manufacturer's recommendations to obtain thicknesses specified and using applicators and techniques best suited for slope and type of substrate to which applied. 1 Provide 60 -mil (average) membrane thickness, with minimum 50 -mil thickness. C. Install sheet -type flashings and joint covers where indicated and as recommended by prime materials manufacturer Extend flashings onto perpendicular surfaces and other work penetrating substrate to not less than 9 inches beyond finished surface to be applied over waterproofing. D Install protection course on cured membrane (after testing, if required) without delay to minimize period of membrane exposure. 1 On vertical surfaces comply with waterproofing manufacturer's recommendations for adhesion of protection course to membrane. 3.3 SCHEDULE A. General. Apply waterproofing membrane as shown on drawings and, if not shown, at exterior face of below grade exterior walls exposed during construction. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 07120 PAGE '3 FLUID- APPLIED WATERPROOFING END OF SECTION 07120 MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 07210 PAGE 1 BUILDING INSULATION A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Concealed building insulation in board form. 2. Building insulation in batt form. B. Related Sections: The following sections contain requirements that relate to this section. 1 Division 7 Section "Built up Roofing" for roof insulation specified as part of roofing construction. 2. Division 7 Section `Exterior Insulation and Finish Systems' for rigid insulation that is part of an EIFS system. 3 Division 9 Section "Gypsum Board Assemblies" for thermal insulation and sound attenuation insulation installed as part of metal -framed wall and partition assemblies. 1.3 DEFINITIONS A. Thermal Receptivity Where the thermal resistivity of insulation products are designated by "r values," they represent the reciprocal of thermal conductivity (k values). Thermal conductivity is the rate of heat flow through a homogenous material exactly 1 inch thick. Thermal resistivities are expressed by the temperature difference in degrees F between the two exposed faces required to cause one BTU to flow through one square foot per hour at mean temperatures indicated. 1.4 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data and installation instructions for each type of insulation product specified. C. Product test reports from and based on tests performed by qualified independent testing laboratory evidencing compliance of insulation products with requirements including r- values (aged values for plastic foam insulations), fire performance characteristics, perm ratings, water absorption ratings, and other properties, based on comprehensive testing of current products. D U.L. or other ICBO accepted Research reports or evaluation reports that evidence compliance of plastic foam insulations with building code in effect for Project. 1.5 QUALITY ASSURANCE A. Fire Performance Characteristics: Provide insulation materials identical to those whose indicated fire performance characteristics have been determined per the ASTM test method indicated below by UL or other testing and inspecting organizations acceptable to authorities MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07210 PAGE 2 BUILDING INSULATION having jurisdiction. Identify products with appropriate markings of applicable testing and inspecting organization. 1 Surface Burning Characteristic: ASTM E 84 2. Fire Resistance Ratings: ASTM E 119 3 .Combustion Characteristics: ASTM E 136 4 Foam plastic insulation characteristics in compliance with UBC Chapter 1713 B. Single -Source Responsibility for Insulation Products: Obtain each type of building insulation from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work. 1.6 DELIVERY, STORAGE, AND HANDLING A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's recommendations for handling, storage, and protection during installation. B. Protect plastic insulation as follows: 1 Do not expose to sunlight, except to extent necessary for period of installation and concealment. 2. Protect against ignition at all times. Do not deliver plastic insulating materials to project site ahead of installation time. 3 Complete installation and concealment of plastic materials as rapidly as possible in each area of construction. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering insulation products that may be incorporated in the work include, but are not limited to, the following: 13. Manufacturers: Subject to compliance with requirements, provide insulation products of one of the following: 1 Molded Polystyrene Board Insulation. a. AFM Corporation. b. DiversiFoam Products. c. Grace Construction Products Div W.R. Grace Co. d. Manufacturers with a third party certification program satisfying mandatory requirements for foam plastics of model building codes. 2. Manufacturers of Glass Fiber Insulation. a. CertainTeed Corp. b. Knauf Fiber Glass GmbH. c. Manville: Building Insulations Div Manville Sales Corp. MAHLUM NORDFORS MCKZNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADD1TIONS ALTERATIONS d. Owens/Corning Fiberglas Corp. 3 Manufacturers of Semi Refractory Fiber Insulation. a. Fibrex, Inc. (708)896 -4800 b. USG Thermafiber DN, USG Interiors, Inc. 2.2 INSULATING MATERIALS 2.3 VAPOR RETARDERS 2.4 AUXILIARY INSULATING MATERIALS SECTION 07210 PAGE 3 BUILDING INSULATION A. General. Provide insulating materials that comply with requirements and with referenced standards. 1. Preformed Units: Sizes to fit applications indicated, selected from manufacturer's standard thicknesses, widths, and lengths. B. Molded Polystyrene Board Insulation. Rigid; cellular thermal insulation formed by the expansion of polystyrene resin beads or granules in a closed mold to comply with ASTM C 578 for type indicated, and as follows: 1 Type II, 1.35 pcf min. density aged r- values of 4 4 and 4 0 at 40 and 75 deg F (4 4 and 23 9 deg C), respectively 2. Surface Burning Characteristics: Maximum flame spread and smoke developed values of 75 and 450, respectively C. Faced Mineral Fiber Blanket/Batt Insulation. Thermal insulation produced by combining mineral fibers of type described below with thermosetting resins to comply with ASTM C 665 for Type III, Class A (blankets with reflective vapor retarder membrane facing with flame spread of 25 or less); foil- scrim -kraft or foil scrim polyethylene vapor retarder membrane on one face, and as follows: 1 Mineral Fiber Type: Fibers manufactured from glass or slag. 2. Surface Burning Characteristics: Maximum flame spread and smoke developed values of 25 and 50, respectively A. Polyethylene Vapor Retarder ASTM D 4397 6.0 mils thick, with a maximum permeance rating of 0 13 perms. B. Tape for Vapor Retarder Pressure sensitive tape of type recommended by vapor retarder manufacturer for sealing joints and penetrations in vapor retarder A. Adhesive for Bonding Insulation: Product with demonstrated capability to bond insulation or mechanical anchors securely to substrates indicated without damaging or corroding either insulation, anchors, or substrates. B. Adhesively Attached Pin Anchors: Perforated plate, 2 inches square, welded to projecting pin, with self locking washer, complying with the following requirements: 1 Plate: Zinc plated steel, 0 106 inch thick. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Pin. Copper -coated low carbon steel, fully annealed, 0 106 inches in diameter, length to suit depth of insulation indicated and, with washer in place, to hold insulation tightly to substrate behind insulation. 3 Self Locking Washer Mild steel, 0 016 inch thick, size as required to hold insulation securely PART 3 EXECUTION 3.1 EXAMINATION SECTION 07210 PAGE 4 BUILDING INSULATION A. Examine substrates and conditions with Installer present, for compliance with requirements of the Sections in which substrates and related work are specified and to determine if other conditions affecting performance of insulation are satisfactory Do not proceed with installation of insulation until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean substrates of substances harmful to insulations or vapor retarders, including removal of projections that might puncture vapor retarders. 3.3 INSTALLATION, GENERAL A. Comply with insulation manufacturer's instructions applicable to products and application indicated. If printed instructions are not available or do not apply to project conditions, consult manufacturer's technical representative for specific recommendations before proceeding with installation of insulation. B Extend insulation full thickness as indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions, and fill voids with insulation. Remove projections that interfere with placement. C. Apply a single layer of insulation of required thickness, unless otherwise shown or required to make up total thickness. 3.4 INSTALLATION OF GENERAL BUILDING INSULATION A. Apply insulation units to substrate by method indicated, complying with manufacturer's recommendations. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units. B. Seal joints between closed -cell (non breathing) insulation units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer. C. Set vapor retarder faced units with vapor retarder to warm side of construction, except as otherwise indicated. Do not obstruct ventilation spaces, except for firestopping. Tape joints and ruptures in vapor retarder, and seal each continuous area of insulation to surrounding construction to ensure airtight installation. D Set reflective, foil -faced units accurately with not less than 0 75 -inch air space in front of foil as indicated. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.5 PROTECTION 0 1997 Mahlon Nordfors McKinley Gordon SECTION 07210 PAGE 5 BUILDING INSULATION E. Stuff glass fiber loose fill insulation into miscellaneous voids and cavity spaces where shown. Compact to approximately 40 percent of normal maximum volume (to a density of approximately 2.5 pct). A. General. Protect installed insulation and vapor retarders from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation will be subject to abuse and cannot be concealed and protected by permanent construction immediately after installation. END OF SECTION 07210 MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 1 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS PART 1 GENERAL 1 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1 2 SUMMARY A. This Section includes the following: 1 Applications over exterior cement board. B. Related Sections: The following Sections contain requirements that relate to this Section: 1 Division 5 Section 'Cold Foamed Metal Framing' for steel stud framing behind system. 2. Division 7 Section 'Joint Sealants' for sealing joints in system with elastomeric joint sealants. 1 3 DEFINITIONS A. Exterior insulation and finish systems refer to exterior assemblies composed of a weather resistive barrier, cement board sheathing, and an inner layer of board insulation and an outer layer composed of a glass- fiber mesh reinforced base coat applied directly to board insulation and a textured protective finish coat. The assemblies are designed to manage water penetration and direct any penetrating water to the exterior These assemblies are applied to supporting substrates of construction indicated. B. System manufacturer refers to the manufacturer of exterior insulation and finish systems. 1 4 PERFORMANCE REQUIREMENTS A. General: Provide systems that comply with the following performance requirements: 1 Bond Integrity• Free from bond failure within system components or between system ad supporting wall construction, resulting from exposure to fire, wind loads, weather or other in- service conditions. 2. Weathertightness: Resistant to significant water penetration from exterior into system and assemblies behind it or through them into interior of building, and capable of managing incidental water intrusion at penetrations such as windows, doors, roof /wall intersections, hose bibs, and electrical boxes. System shall include a weather resistive barrier and flashing elements that are designed and installed to ensure the exit of rain water to the exterior. B. Physical Properties of EIFS. Provide exterior insulation and fmish systems whose physical properties and structural performance comply with the following requirements when tested per methods referenced. 1 Accelerated Weathering Characteristics: Sample of size suitable for test equipment aid consisting of 1 -inch thick exterior insulation system mounted on 1/2 -inch thick gypsum board, cured for 28 days, shows no evidence of cracking, flaking, or deleterious effects after testing for 2,000 hours per Method 1 of ASTM G 23. 2. Water Penetration: Sample, consisting of 1 -inch thick exterior insulation and finish system mounted on 1/2 -inch thick gypsum board, .cured for 28 days, shows no water penetration into the plane of the innermost face of the test specimen under 2.86 psf of air MAHLUM NORDFORS McKINLEY GORDON SECTION 0 7 2 41 PAGE 2 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS pressure difference across the specimen during a 15- minute test period when tested per ASTM E 331 3 Water Resistance: Sample, consisting of 1 -inch thick exterior insulation and finish system mounted on 1R -inch thick board, cured for 28 days, shows no deleterious effects after testing for 14 days per ASTM D 2247 4. Salt -Spray Resistance: Sample, consisting of 1 -inch thick exterior insulation and finish system mounted on 1/2 -inch thick gypsum board, cured for 28 days, shows no deleterious effects after testing for 300 hours per ASTM B 117 5 Mildew Resistance: Sample, consisting of finish coat applied to 2 by 2 inch clean glass substrate, cured for 28 days, shows no mildew growth when tested per MIL Standard 810C, Method 508. 6. Abrasion Resistance: Sample, consisting of 1 -inch thick exterior insulation and finish system mounted on 1/2 -inch thick gypsum board, cured for a minimum of 28 days, shows no evidence of cracking, checking, or loss of film integrity after exposure to 500 liters of sand when tested per ASTM D 968, Method A. 7 Impact Resistance: Sample, consisting of 1 -inch thick exterior insulation and finish system when constructed, conditioned, and tested per EIMA 101.86, produces the following impact classification and range: a. Medium Impact Resistance: 50 -89 inch -lb. 1 5 SUBMITTALS A. General: Submit each item i n th Art according to the Conditions of the Contract and Division 1 Specification Sections. B. Product data for each component of exterior insulation and finish systems specified. C Shop drawings showing fabrication and installation of system including plans, elevations, sections, details of components, control joint locations and configurations within system and between system and construction penetrating it, and attachments to construction behind system. D Samples for verification in the form of 24- inch square panels for each finish, color texture, and pattern specified. Prepare samples using same tools and techniques intended for actual work. 1 Incorporate within each sample a typical control joint filled with sealant of color indicated or selected. E. Installer certificates signed by manufacturer certifying that Installers comply with requirements under the "Quality Assurance Article. F Qualification data for firms and persons specified in the 'Quality Assurance' Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and address of architects and owners, and other information specified. G Product test reports from a qualified independent testing agency evidencing compliance of exterior insulation and finish systems with requirements based on comprehensive testing of current products. H. If requested, research reports or evaluation reports of the model code organization acceptable to authorities having jurisdiction that evidence system's compliance with building code in effect for Project. MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 3 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS 1 6 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed systems similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance, and who is certified in writing by system manufacturer as qualified to install manufacturer's system. The following installers are so certified for the Quality Standard 1lroduct: 1 Tuffy Omally Inc. (360) 745 -2484 2. Wall Finishes, Inc. (206) 242 -8406 3. N.W Campbell Co. (253) 927 3900 4 D.L. Henricksen Co. Inc. (253) 922 5566 B. Fire- Test Response Characteristics: Provide materials and construction that are identical to those tested with the following fire-test-response characteristics, as determined by testing per ASTM test method indicated below by UL or other testing and inspecting agencies acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing and inspecting agency 1 Flame Spread of Insulation Board and Finish Coats: 25 or less when tested individually per ASTM E 84 2. Smoke Developed of Insulation Board and Finish Coats: 450 or less when tested individually per ASTM E 84 3 Full -Scale Multistory Fire Test: Tested mockup, representative of completed multistory wall assembly of which system is a part, complies with Uniform Building Code (UBC) No. 17 -6 for test method and required fire- test response characteristics of exterior nonload- bearing wall panel assemblies containing foam plastic insulation. 4 Fire Resistance Characteristics: Where indicated, provide materials and construction identical to those of assemblies whose fire resistance has been determined per ASTM E 119 by testing and inspecting agency acceptable to authorities having jurisdiction. C Single- Source Responsibility Obtain materials for system from one source and by a single manufacturer or by manufacturers approved by the system manufacturer as compatible with other system components. D Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings. 1 7 DELIVERY, STORAGE, AND HANDLING A. Deliver products in original, unopened packages with manufacturer's labels identifying products legible and intact. B. Store materials inside and under cover keep them dry and protected from the weather direct sunlight, surface contamination, aging, corrosion, damaging temperatures, damage from construction traffic, and other causes. 1 Stack insulation board flat and off the ground. C Keep Material Safety Data Sheets available for all materials. MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 4 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS 1 8 PROJECT CONDITIONS A. Environmental Conditions: Do not install system when ambient outdoor air and substrate temperatures are 40 deg F and falling unless temporary protection and heat are provided to maintain ambient temperatures above 40 deg F during installation of wet materials and until they have dried thoroughly and become weather resistant, but for not less than 24 hours after installation. Do not install joint reinforcing tape, basecoat and finishes to surfaces which are wet, frozen or contain frost. 1 9 COORDINATION AND SCHEDULING A. Coordinate installation of system with related units of Work specified in other Sections to ensure that wall assemblies, including sheathing, flashing, trim, and joint sealers, are protected against damage from the effects of weather, age, corrosion, and other causes. FART 2 PRODUCTS 2 1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide exterior insulation and finishing system by one of the following: 1 United States Gypsum Co. (800) 365 -5874 Ext. 6753 2. Others as approved by addendum. 2 2 MATERIALS A. Compatibility Provide adhesive, board insulation, reinforcing fabrics, base and finish coat materials, sealants, and accessories that are compatible with one another and approved for use by system manufacturer. 1 Quality Standard Product for EIFS. USG InsulScreen 2100 B. Colors and Textures of Finish Coat: Comply with the following requirements: 1 Match Architect's samples. C Exterior Cement Board: 1/2- inch thick aggregated portland cement product faced on both surfaces with an embedded polymer -coated glass -fiber mesh and recommended by the manufacturer for exterior applications. One surface of board shall have a rough texture 'for adhesive bonding. Board shall have an ASTM C 947 flexural strength of 1000 lb /sq. in. and shall show n� deterioration when subjected to 100 freeze -thaw cycles per ASTM C 666 Procedure B. 1 Quality Standard Product: USG Cement Board Exterior Cement Board. D Fasteners for Exterior Cement Board: 1 5/8 inches, No. 8 wafer -head steel drill screws complying with ASTM C 954 with an organic polymer coating or other corrosion- protective coating having a salt -spray resistance of more than 500 hours per ASTM B 117 E. Asphalt- Saturated Organic Felt: ASTM D 226, Type I (No. 15 asphalt felt) unperforated. 1 Quality Standard Product: Fortifiber Super Jumbo Tex sheathing paper F Water Barrier Tape: Polyethylene film coated, self sealing, self adhesive tape with silicone treated release sheet. 1 Quality Standard Product: USG InsulScreen Water Barrier Tape. MAHLUM NORDFORS McKINLEY GORDON SECTION 0 7 2 41 PAGE 5 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS G Adhesive for Application of Insulation: System manufacturer's standard formulation designed for indicated use, compatible with substrate, and complying with the following requirements: 1 Factory-mixed formulation designed for adhesive attachment of insulation to substrates of type indicated, as approved by system manufacturer. 2. Quality Standard Product USG Insulation Board Adhesive. H. Molded Polystyrene Board Insulation: Rigid cellular thermal insulation formed by the expansion of polystyrene resin beads or granules in a closed mold, complying with ASTM C 578 for Type I, approved by system manufacturer for material qualities including comer squareness, other dimensional tolerances, and the following: 1 Age insulation in block form prior to cutting and shipping by air drying for not less than 6 weeks or by another method approved by system manufacturer that produces equivalent results. 2. Provide insulation in boards not more than 24 by 48 inches (610 by 1219 mm) and in thickness indicated but not less than that allowed by system manufacturer nor more than 4 inches (102 mm). 3 Nominal density not less than 1.0 pcf, R Value 3.8 minimum per inch. 4 Flame spread rating of less than 25 per ASTM E 84 5 Smoke developed rating of less than 450 per ASTM E 84 6. Quality Standard Product USG Exterior Insulation Board. Reinforcing Fabric: Balanced, alkali- resistant open -weave glass -fiber fabric treated for compatibility with other system materials, made from continuous multiend strands with tensile strength of not less than 145 lb and 150 lb in warp and fill directions per ASTM D 5035 complying with ASTM D 578 and the following requirements for minimum weight: 1 Intermediate Reinforcing Fabric: 12.5 oz. /sq. yd. 2. Quality Standard Product: USG Exterior Intermediate Weight Reinforcing Mesh. J Base Coat Materials: System manufacturer's standard mixture complying with the following requirements for material composition and method of combining materials: 1 Factory- blended dry formulation of portland cement, dry polymer admixture, and inert fillers to which only water is added at the job site. 2. Quality Standard Product: USG Exterior Basecoat. K. Finish Coat Materials: System manufacturer's standard mixture complying with the following requirements for material composition and method of combining materials: 1 Factory-mixed formulation of polymer emulsion binder colorfast mineral pigments, sound stone particles, and fillers. 2. Quality Standard Product: USG Exterior Textured Finish, Sand finish texture. L. Water Clean and potable. M. Trim Accessories: Type as designated or required to suit conditions indicated and to comply with system manufacturer's requirements, manufactured from vinyl plastic and complying with ASTM C 1063 1 All flanges designed to receive basecoat and finish products shall have 1/4 inch diameter holes, staggered, with a minimum 1/8 inch space between all holes on all rows. Flanges shall have a minimum thickness of .060 inch. MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 6 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS 2. All grounds used for terminating basecoats and finishes shall have a maximum height of 3/32 inch. The use of grounds help insure the proper basecoat thickness over the flange. Weep holes shall have a maximum diameter of 1/8 inch and a maximum spacing of 3 inches on center. 2 4 MIXING A. General: Comply with system manufacturer's requirements for combining and mixing materials. Do not introduce admixtures, water or other materials except as approved by system manufacturer. Mix materials in clean containers. Use materials within time period specified by system manufacturer or discard. PART 3 >EXECUTION 3 1 EXAMINATION A. Examine substrates, with Installer present, to determine if they are in satisfactory condition for installation of system. Do not proceed with installation of system until unsatisfactory conditions have been corrected. 3 2 PREPARATION A. Protect contiguous work from moisture deterioration and soiling resulting from application of systems. Provide temporary covering and other protection needed to prevent spattering of exterior finish coatings on other work. B. Protect system, substrates, and wall construction behind them from inclement weather during installation. Prevent infiltration of moisture behind system and deterioration of substrates. C Prepare and clean substrates to comply with system manufacturer's requirements to obtain optimum bond between substrate and adhesive for insulation. 1 Apply primer sealer over substrates where required by system manufacturer for improving adhesion or for protecting substrates from premature degradation. 3 3 INSTALLATION A. Comply with manufacturer's current published instructions for installation of system as applicable to each type of substrate indicated, including manufacturer's published details. B. Weather Resistive Barrier. Install horizontally over open framing with tape or adhesive. Lap weather resistive barrier 4 inches to 6 inches at all joints in shingle -like manner (bottom course installed first) to prevent water penetration. Cut weather resistive barrier horizontally across window and door heads and sill to comers of rough opening. Then, cut vertically down the center of the rough opening and wrap weather resistive barrier into opening around jamb framing members. Do not wrap the weather resistive barrier around the window or door header C Window and Door Opening Preparation: Flash window and door penetrations to effectively channel all water that may penetrate the window or its seals to the exterior side of the weather resistive barrier. If pre- engineered pan flashing specifically manufactured for installation below windows and doors is not available, use the following flashing procedures with the approval of the window and door manufacturers. Perform the following work only when the windows and door units are ready to be installed, thereby minimizing damage to the prepared areas. 1 The rough sill shall be sloped toward the exterior 1/4 inch over the depth of the sill to provide positive drainage. This can be accomplished by either sloping the rough sill framing or installing a vinyl sloped sill wedge. Note The rough opening vertical MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 7 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS dimension may have to be increased 1/4 inch to accommodate the height of the sill wedge. 2. Cut the vinyl sill wedge component 1/8 inch shorter than the width of the rough opening. 3. Install the sloped sill wedge over the rough sill such that the sill wedge slopes toward the exterior Fasten rough sill using screws spaced a minimum of 16 inches on center driven through the center of the sill wedge. To avoid deforming the sill wedge do not oven :hive fasteners. 4 Unwrap the weather resistive barrier that covers the jamb studs. Cut a piece of 9 inch wide water barrier tape approximately 4 to 6 inches longer than the width of the window opening. Lap the water barrier tape approximately 2 to 2 inches over the interior sill framing, across the sill wedge, and over the weather resistive barrier on the exterior and approximately 2 to 3 inches up each jamb. Remove paper backing and press in place. Re- wrap weather resistive barrier over the water barrier tape and jambs. This procedure ensures a shingle -like relationship between the weather resistive barrier and the water barrier tape. The tape material should be creased tightly into comers, and additional tape applied to seal all cuts or holes in the tape or weather resistive barrier 5 Do not wrap the window or door head with either the weather resistive barrier or the membrane flashing material. D Window/Door Installation: Install window /door per manufacturer's recommendation. The window is typically installed over the weather resistive barrier Commercial block framed aluminum windows will require a separate head flashing. Therefore, a horizontal cut is required above the window head to allow insertion of the Head Flashing component under the weather resistive barrier Cut and install the Head Flashing component even with the width of the window Attach the Head Flashing component with nails or screws spaced 16' o.c. max. E. Installation of system terminations General Instructions: Trim accessories shall be fastened to the framing members with nails or screws spaced a maximum of 16' o.c. Lap the weather resistive barrier into trim components and install insulation board. Cover the flanges of trims with Basecoat or Exterior Acrylic Component reinforced with Exterior Reinforcing Mesh. Feather the base coat from trim grounds into the field of the board a minimum of 4 and allow to cure for a minimum of 4 hours before completing full basecoat application. 1 As an altemate to the use of trim components `back wrapping' is permitted. Back wrapping is a technique for basecoating and reinforcing the edges of foam insulation at terminations. To back -wrap on the wall, staple Exterior Detail Weight Reinforcing Mesh to the cement board panel where the foam s edges will lie, insuring that a minimum 2' of mesh is under the foam insulation when installed. Allow for enough mesh to wrap around the edges and at least 2' onto the face of the foam insulation. Follow the instructions for adhesively applying foam insulation to the substrate. Position the edge of the insulation at the specified location. After the insulation board adhesive has set for 24 hours, embed the detail weight mesh into basecoat that has been applied to the edges and face of the insulation board. Foam insulation sections may be basecoated and back wrapped away from the wall and then adhesively attached to the wall after they have cured for 24 hours. F Continuous flashing along foundations and proper step flashing and kick -out flashing at all roof /wall intersections is required. 1 Foundations and Roof/Wall Intersections: Terminate the system by one of the following methods: a. Installation of a weeped Starter Track component is recommended at all foundation and roof/wall intersection terminations. The Starter Track shall be attached to the MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 8 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS framing through the sheathing (if used) and any requited flashing, prior to the application of the weather resistive barrier. Snap a level chalk -line on the sheathing at the base of the wall that will coincide with the location of the top of the Starter Track attachment flange. Attach the Starter Track over the open framing or sheathing using nails or screws spaced a maximum of 16" o.c. Butt sections of Starter Track together Miter inside and outside corners. Lap the weather resistive barrier into the Starter Track. The Cement Board and foam insulation shall be held up 1/16' to 3/16" from the bottom of the Starter Track to allow for drainage through the weep holes. b. The system may also be terminated using the conventional back -wrap technique as described in the General Instructions above. 2. Window and Door Terminations: Terminate the system by one of the following methods: a. Install Head Flashing as described above. Apply a weeped Starter Track over the Head Flashing and weather resistive barrier. Attach the Starter Track using nails or screws spaced a maximum of 16' o.c. Apply casing beads along the jambs and sill. Leave a 3/8' to 1/2' space between the casing beads and the window frame. Butt ends of Starter Track and Casing Bead together and miter corners. A small strip of Water Barrier Tape, applied across the bottom of the Starter Track and the Casing Bead, should be used to hold the two mitered corners together Install the Cement Board and foam band into the casing bead and Starter Track. The Cement Board and foam bands shall be held up 1/16' to 3/16' from the bottom of the Starter Track to allow for drainage through weeps. b The system may also be terminated using the conventional back-wrap technique. When using this method, it is imperative that a 3/8' to 1/2' space be provided between the edge of the foam band and the frame to provide for the application of backer rod and sealant. Note. The use of vinyl trims is the "recommended" method for terminating the edge of the exterior system. The bondable surface and future maintenance of the sealant is improved when vinyl trims are used. G Furring Lath Strips: Install furring lath strips over the weather resistive barrier when a rigid sheathing is used under the weather resistive barrier Fasten the 3' wide furring lath strips vertically at the location of each framing member with screws for steel framing and nails or staples for wood framing. Install strips at all system terminations including windows, doors and foundations. Space fasteners a maximum of 12' o.c. DO NOT lap the Furring Lath Strips. Stop all furring lath 1/4" to 2' away from edges of Starter Track/Casing Bead flanges. H. Surface Control Joint and Reveals: As shown on building elevation drawings. As a minimum control joints shall be installed at all building expansion joints, at the intersection of dissimilar substrates or finishing materials, at other major building discontinuities, and any areas where concentrated stresses are anticipated. Cement Board Panels: Cut Cement Board Panels to size with a carbide tipped knife and a straight edge. A power saw with a carbide tip blade, may be used if equipped with a dust collection device and NIOSH approved dust mask and safety glasses are worn. 1 Install the Cement Board Panels over open framing or over an approved sheathing. A weather resistive barrier shall be applied between the Cement Board Panels and the open framing or sheathing. Cement Board Panels may not be used as a structural sheathing. For racking resistance, separate bracing must be installed. 2. The Cement Board Panels may be installed either horizontally (long edges perpendicular to the framing) or vertically (long edges parallel to the framing). Horizontal is the MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 9 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS recommended method of application. To facilitate application of the Cement Board Panels the following procedure is recommended Install the Cement Board Panels with the rough side toward the exterior Snap a level chalk line indicating the location of the first course (bottom of the second course) of the Cement Board Panels. This line will become the starting point for attaching the Cement Board Panels. At each stud location along the chalk line, partially drive a Cement Board screw or hot dipped galvanized roofmg nail only into the framing to support the Cement Board Panels until they can be fastened to the framing. Fit abutting ends closely but not forced together Gap each successive course of Cement Board Panels (the horizontal joint) a maximum of 1/8' Center the ends, vertical joints, over framing members with a minimum 5/8' bearing on the face of each "id. Subsequent courses of panels shall have their vertical joints staggered by a minimum of one stud cavity Note: Drive in all nails or screws used for gapping prior to application of basecoat. After the second course of Cement Board Panels has been installed, the first course can then be installed by sliding the panels upward until it butts the spacer screws. 3 Precut the Panels into L- shaped pieces to fit around door and window openings. Ensure that a minimum 8' width of Panel be maintained above and below window and door openings. Panel joints shall not align with corners of windows, doors, or other wall penetrations. For any given elevation, measure the height of the wall and determine where the horizontal panel -to -panel joints should be located based on: a. Cement Board Panels being L-cut around all window and door penetrations b. Cement Board Panel joints not coinciding with sheathing joints (if used). This may require starting with a less than full width panel. 4 Fasten the Cement Baud Panels along the framing members spaced a maximum of 8' o.c. for walls with Cement Board Steel Screws. A 3/8' minimum fastener penetration into the steel framing members is required. Position perimeter fasteners at least 3/8' and less than 5/8' from ends and edges. Drive fasteners in field of panel first, working towards ends and edges. Hold panel in firm contact with framing members while driving fasteners. Drive fasteners so bottom of heads are flush with surface of panel to provide firm panel contact with the framing members. Do not drive fastener heads below panel surface. 5 Starter Track and Casing Bead trim components shall be installed at head, jambs and sill prior to installing the Cement Board Panels. A 3/8' to 1/2' gap shall be left between the Casing Bead component and the edge of the window or door for subsequent application of backer rod and sealant. 6. Once the Cement Board Panels have been fastened, drive all spacer screws or nails flush with the board. J Inspection and Preparation for Finish: Perform the following before proceeding with installation of basecoat and insulation board: 1 Inspect exterior cement board to ensure that it is securely fastened to framing and free of voids, surface delaminations, projections, or surface deterioration. Check to ensure that exterior surface is flat and within the dimensional tolerance of 1/4 inch in 4 feet, both directions. Repair and/or replace any defects in the cement board panels or weather resistive barrier. 2. Provide sufficient personnel, scaffolding, and utilities such that adequate quantities of basecoat and finish materials can be mixed and applied to ensure continuous application, between natural breaks in the wall such as corners and control joints. K. Adhesively attach insulation as recommended by manufacturer and to comply with the following requirements: MAHLUM NORDFORS McKINLEY GORDON SECTION 07241 PAGE 10 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS 1 Exterior Insulation Board shall be applied starting at the bottom. The first course shall be fit into the Starter Strip. The insulation boards shall be held up 1/16" to 3/16" from the bottom of the Starter Strip to allow for drainage. The insulation board shall be installed with the long edges horizontal, using a running bond pattern. The joints shall be offset 8' minimum from the joints in the substrate. Alternately lap Exterior Insulation Boards at comers. 2` Precut the insulation board into L- shaped pieces to fit around door and window openings. Joints shall not align with corners of windows, doors, wall penetrations or substrate joints. 3. Back -wrap insulation board with Exterior Detail Weight Reinforcing Mesh a minimum of 2" at all terminations or install into vinyl trim components. 4 Use Exterior Basecoat, or Exterior Acrylic Component or Insulation Board Adhesive for adhesively attaching Exterior Insulation Board to Cement Board panels. 5 Mix Exterior Basecoat or Exterior Acrylic Component according to the instructions printed on the containers. 6. Apply Exterior Basecoat or Exterior Acrylic Component directly to the entire back surface only of the Exterior Insulation Board using a U- notched trowel, 1/2' deep by 3/8' wide by 1 1/2' apart. Be sure the trowel is at a 45 degree angle to the insulation board when applying material to ensure consistent uniform coverage. The coated insulation board shall be immediately applied to the surface of the substrate and slid diagonally into place. The insulation board edges must butt tightly without any adhesive between the boards. Apply firm pressure over the entire insulation board surface and tamp to ensure uniform contact. Use a straight edge at least 6' long to check the plane of the adjacent Exterior Insulation Boards. 7 Any gaps 1/8' or larger between insulation boards shall be filled with slivers of insulation board cut and shaped to fit the gap. Insert the slivers of insulation without using adhesive. 8. Allow the adhesive material to dry or cure for a minimum of 24 hours before rasping of insulation board or applying the reinforcing mesh and basecoat material. 9 Protect insulation from exposure to rain, freezing conditions and physical damage until basecoat is fully cured. 10. Cut grooves, rabbets, and other features in outside face of insulation with high -speed router and bit configured to produce grooves, rabbets, and other features that conform accurately to profiles and locations indicated. Do not reduce insulation thickness at features to less than 3/4 inch. 11 Interrupt insulation where expansion joints are indicated in substrates behind exterior insulation and fmish systems. 12. Form joints for sealant application with back- to-back casing beads for joints within system and with perimeter casing beads at dissimilar adjoining surfaces. Make gaps between casing beads and between perimeter casing beads and adjoining surfaces of width indicated 13 Treat edges of insulation board at trim accessories by extending base coat, reinforcing fabric, and finish coat over face leg of accessories. 14 Coordinate flashing installation with installation of insulation. L. Apply base coat to exposed surfaces of insulation in minimum thickness specified by system manufacturer. MAHLUM NORDFORS McKINLEY GORDON SECTION 0 7 2 41 PAGE 11 OLYMPIC MEMORIAL HOSPITAL EXTERIOR INSULATION AND FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEMS M. Embed reinforcing fabric of type indicated below in wet base coat to produce wrinkle -free installation with fabric continuous or lapped at comers and lapped or otherwise treated at joints to comply with system manufacturer's requirements. Completely embed fabric, applying additional base coat material if necessary so that reinforcing fabric pattern is not visible. 1 Intermediate reinforcing fabric where indicated. N Additional Reinforcing Fabric: Apply strip reinforcing fabric around openings extending 4 inches (100 mm) beyond perimeter. Apply additional 8 by 16 inch (200 by 400 mm) strip reinforcing fabric diagonally at corners of openings (re- entrant corners). Apply 8 -inch- (200 mm-) wide strip reinforcing at both inside and outside corners unless base layer of fabric is lapped at least 4 inches (100 mm) on each side of corners. 1 At decorative grooves (false joints), apply strip reinforcing at least 8 inches (200 mm) wide. 2. Embed strip reinforcing fabric in base coat before applying first layer of reinforcing fabric. 0 Apply finish coat over dry base coat in thickness required by system manufacturer to produce a uniform finish of texture and color matching approved sample. 3 6 CLEANING AND PROTECTION A. Remove temporary covering and protection of other work. Promptly remove coating materials from window and door frames and other surfaces outside areas indicated to receive system coatings. B. Provide final protection and maintain conditions in a manner acceptable to Installer and system manufacturer that ensures system's being without damage or deterioration at time of Substantial Completion. 1997 Mahlum Nordfora McKinley Gordon END OF SECTION 07241 MAHLUM NORDFORS McKINLEY GORDON SECTION 07242 PAGE 1 OLYMPIC MEMORIAL HOSPITAL DIRECT APPLIED EXTERIOR FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEM PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary 2onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Applications over exterior cement board. B. Related Sections: The following Sections contain requirements that relate to this Section: 1 Division 5 Section "Cold- Formed Metal Framing" for steel stud framing behind system. 2. Division 7 Section "Joint Sealants" for sealing joints in system with elastomeric joint sealants. 1.3 DEFINITIONS A. Direct applied exterior finish systems (DEFS) refer to exterior assemblies composed of an outer layer composed of a glass- fiber mesh reinforced base coat applied directly to cement board and a textured protective finish coat. These assemblies are applied to supporting substrates of construction indicated. B. System manufacturer refers to the manufacturer of direct applied exterior finish systems. 1.4 PERFORMANCE REQUIREMENTS A. General. Provide systems complying with the following performance requirements: 1 Bond Integrity• Free from bond failure within system components or between system and supporting wall construction, resulting from exposure to fire, wind loads, weather or other in- service conditions. 2. Weathertightness: Resistant to water penetration from exterior into system and assemblies behind it and to accommodate incidental water that penetrates the system. B. Physical Properties of DEFS. Provide direct applied exterior finish systems whose physical properties and structural performance comply with the following requirements when tested per methods referenced. 1 Accelerated Weathering Characteristics: Sample of size suitable for test equipment and consisting of finish system, cured for 28 days, shows no evidence of cracking, flaking, peeling, blistering, or deleterious effects after testing for 2,000 hours per ASTM G 23 Method 1 or ASTM G 53 2. Water Penetration. Sample, 24 by 48 inches in size, consisting of finish system, cured for 28 days, shows no evidence of visible leaks, no blistering, cracking, or wear of the finish coat when tested per FS TT-C 555 or ASTM E 331 3 Salt -Spray Resistance: Sample, minimum of 4 by 6 inches in size, consisting of finish system, cured for 28 days, shows no deleterious effects after testing for 300 hours per ASTM B 117 4 Mildew Resistance: Sample, consisting of finish coat applied to 2 -by -2 -inch glass slides per manufacturer's instructions, cured for 28 days, shows no mildew growth when tested per MIL Standard 810C, Method 508. MAHLUM NORDFORS McICINNLEY GORDON SECTION 07242 PAGE 2 OLYMPIC MEMORIAL HOSPITAL DIRECT APPLIED EXTERIOR FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEM 5 Abrasion Resistance: Sample, consisting of finish system cured for 28 days, shows no evidence of cracking, checking, or loss of film integrity after exposure to 500 liters of sand when tested per ASTM D 968, Method A. 1.5 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product data for each component of direct applied exterior finish systems specified. C. Shop drawings showing fabrication and installation of system including plans, elevations, sections, details of components, joint locations and configurations within system and between system and construction penetrating it, and attachments to construction behind system. D Samples for verification in the form of 24 -inch- (600 -mm square panels for each finish, color, texture, and pattern specified. Prepare samples using same tools and techniques intended for actual work. E. Qualification data for firms and persons specified in the "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and address of architects and owners, and other information specified. F Product test reports from a qualified independent testing agency evidencing compliance of components and systems with requirements based on comprehensive testing of current products. G. If requested, research reports or evaluation reports of the model code organization acceptable to authorities having jurisdiction that evidence system's compliance with building code in effect for Project. 1.6 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed systems similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance, and who is certified in writing by system manufacturer as qualified to install manufacturer's system. The following installers are so certified for the Quality Standard Product: 1 Tuffy Omally Inc. (360) 745 -2484 2. Wall Finishes, Inc. (206) 242 -8406 3 N.W Campbell Co. (253) 927 -3900 4 D.L. Henricksen Co. Inc. (253) 922 -5566 B Fire Test Response Characteristics: Provide materials and construction that are identical to those tested with the following fire- test response characteristics, as determined by testing per ASTM test method indicated below by UL or other testing and inspecting agencies acceptable to authorities having jurisdiction. Identify products with appropriate markings of applicable testing and inspecting agency 1 Flame Spread Finish Coats: 25 or less when tested individually per ASTM E 84 2. Smoke Developed of Finish Coats: 450 or less when tested individually per ASTM E 84 MAHLUM NORDFORS McIONLEY GORDON SECTION 07242 PAGE 3 OLYMPIC MEMORIAL HOSPITAL DIRECT APPLIED EXTERIOR FINISH 2 MAIN/SURGERY ADDITIONS ALTERATIONS SYSTEM 3 Full -Scale Fire Test: Tested mockup, in the form indicated below that represents completed wall assembly of which system is a part, shows no tendency to propagate flame over the surface or through finish to the core, or to cause delamination of finish when vertically mounted exterior face is exposed 15 minutes to a fire source using spread of flame test per ASTM E 108 modified for testing vertical walls as indicated below* C. Single -Source Responsibility' Obtain materials for system from one source and by a single manufacturer or by manufacturers approved by the system manufacturer as compatible with other system components. 1.7 DELIVERY, STORAGE, AND HANDLING A. Deliver products in original, unopened packages with manufacturer's labels identifying products legible and intact. B. Store materials inside and under cover keep them dry and protected from the weather, direct sunlight, surface contamination, aging, corrosion, damaging temperatures, damage from construction traffic, and other causes. C. Remove damaged or deteriorated materials from the premises. D Provide Material Safety Data Sheets for all materials. 1.8 PROJECT CONDITIONS A. Environmental Conditions: Do not install system when ambient outdoor air and substrate temperatures are 40 deg F and falling unless temporary protection and heat are provided to maintain ambient temperatures above 40 deg F during installation of wet materials and until they have dried thoroughly and become weather resistant, but for not less than 24 hours after installation. 1.9 COORDINATION AND SCHEDULING A. Coordinate installation of system with related units of Work specified in other Sections to ensure that wall assemblies, including flashing, trim, and joint sealers, are protected against damage from the effects of weather, age, corrosion, and other causes. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide direct applied exterior finishing system by one of the following: 1 United States Gypsum Co. (800) 365 -5874 Ext. 6753 2. Others as approved by addendum. 2.2 MATERIALS A. Compatibility* Provide reinforcing fabric, base and finish coat materials, and accessories that are compatible with one another and approved for use by system manufacturer. 1 DEFS Quality Standard Product: USG Duroscreen 1000 B. Provide color and texture of protective coating to comply with the following requirements: MAHLUM NORDFORS MCIdNLEY GORDON SECTION 07242 PAGE 4 OLYMPIC MEMORIAL HOSPITAL DIRECT APPLIED EXTERIOR FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEM 1 Match Architect's sample. C. Exterior Cement Board. 1 /2- inch thick aggregated portland cement product faced on both surfaces with an embedded polymer coated glass -fiber mesh and recommended by the manufacturer for exterior applications. One surface of board shall have a rough texture for adhesive bonding. Board shall have an ASTM C 947 flexural strength of 1000 lb /sq. in. and shall 'show no deterioration when subjected to 100 freeze -thaw cycles per ASTM C 666, Procedure B. 1 Quality Standard Product: USG Cement Board Exterior Cement Board. D Fasteners for Exterior Cement Board: 1 -5/8 inches, No. 8 wafer -head steel drill screws complying with ASTM C 954 with an organic polymer coating or other corrosion- protective coating having a salt -spray resistance of more than 500 hours per ASTM B 117 E. Reinforcing Fabric: Balanced, alkali resistant open -weave glass -fiber fabric treated for compatibility with other system materials, made from continuous multiend strands with tensile strength of not less than 145 lb and 150 lb in warp and fill directions per ASTM D 5035 complying with ASTM D 578 and the following requirements for minimum weight: 1 Standard Reinforcing Fabric: 4.3 oz. /sq. yd. 2. Quality Standard Product: USG Exterior Standard Weight Reinforcing Mesh. F Base Coat Materials: System manufacturer's standard mixture complying with the following requirements for material composition and method of combining materials: 1 Factory blended dry formulation of portland cement, dry polymer admixture, and inert fillers to which only water is added at the job site. 2. Quality Standard Product: USG Exterior Basecoat. G. Finish Coat Materials: System manufacturer's standard mixture complying with the following requirements for material composition and method of combining materials: 1 Factory formulation of polymer emulsion binder, colorfast mineral pigments, sound stone particles, and fillers. 2. Quality Standard Product: USG Exterior Textured Finish, Sand finish texture. H. Water Clean and potable. Trim Accessories: Type as designated or required to suit conditions indicated and to comply with system manufacturer's requirements, manufactured from vinyl plastic and complying with ASTM C 1063 1 All flanges designed to receive basecoat and finish products shall have 1/4 inch diameter holes, staggered, with a minimum 1/8 inch space between all holes on all rows. Flanges shall have a minimum thickness of 060 inch. 2. All grounds used for terminating basecoats and finishes shall have a maximum height of 3/32 inch. The use of grounds help insure the proper basecoat thickness over the flange. Weep holes shall have a maximum diameter of 1/8 inch and a maximum spacing of 3 inches on center 2.4 MIXING A. General. Comply with system manufacturer's requirements for combining and mixing materials. Do not introduce admixtures, water, or other materials except as approved by 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKTNLEY GORDON SECTION 07242 PAGE 5 OLYMPIC MEMORIAL HOSPITAL DIRECT APPLIED EXTERIOR FINISH 2 MAIN/SURGERY ADDITIONS ALTERATIONS SYSTEM system manufacturer Mix materials in clean containers. Use materials within time period specified by system manufacturer or discard. PART 3- EXECU1'ION 3.1 EXAMINATION A. Examine substrates, with Installer present, to determine if they are in satisfactory condition for installation of system. Do not proceed with installation of system until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Protect contiguous work from moisture deterioration and soiling resulting from application of systems. Provide temporary covering and other protection needed to prevent spattering of exterior finish coatings on other work. B. Protect system, substrates, and wall construction behind them from inclement weather during installation. Prevent infiltration of moisture behind system and deterioration of substrates. C. Prepare and clean substrates to comply with system manufacturer's requirements to obtain optimum bond between substrate and adhesive for insulation. 1 Apply primer sealer over substrates where required by system manufacturer for improving adhesion or for protecting substrates from premature degradation. 3.3 INSTALLATION A. Comply with manufacturer's current published instructions for installation of system as applicable to each type of substrate indicated, including manufacturer's published details. B Weather Resistive Barrier Install horizontally over open framing with tape or adhesive. Lap weather resistive barrier 4 inches to 6 inches at all joints in shingle -like manner (bottom course installed first) to prevent water penetration. C. Exterior Cement Board Panels: Cut Cement Board Panels to size with a carbide tipped knife and a straight edge. A power saw with a carbide tip blade, may be used if equipped with a dust collection device and NIOSH approved dust mask and safety glasses are worn. 1 Install the Cement Board Panels over open framing or over an approved sheathing. A weather resistive barrier shall be applied between the Cement Board Panels and the open framing or sheathing. Cement Board Panels may not be used as a structural sheathing. For racking resistance, separate bracing must be installed. 2. The Cement Board Panels may be installed either horizontally (long edges perpendicular to the framing) or vertically (long edges parallel to the framing). Horizontal is the recommended method of application. To facilitate application of the Cement Board Panels the following procedure is recommended. Install the Cement Board Panels with the rough side toward the exterior Snap a level chalk line indicating the location of the first course (bottom of the second course) of the Cement Board Panels. This line will become the starting point for attaching the Cement Board Panels. At each stud location along the chalk line, partially drive a Cement Board screw or hot dipped galvanized roofing nail only into the framing to support the Cement Board Panels until they can be fastened to the framing. Fit abutting ends closely but not forced together Gap each successive course of Cement Board Panels (the horizontal joint) a maximum of 1/8' Center the ends, vertical joints, over framing members with a minimum 5/8' bearing on the face of each stud. Subsequent courses of panels shall have their vertical joints MAHLUM NORDFORS McKINLEY GORDON SECTION 07242 PAGE 6 OLYMPIC MEMORIAL HOSPITAL DIRECT APPLIED EXTERIOR FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEM staggered by a minimum of one stud cavity Note: Drive in all nails or screws used for gapping prior to application of basecoat. After the second course of Cement Board Panels has been installed, the first course can then be installed by sliding the panels upward until it butts the spacer screws. 3 Fasten the Cement Board Panels along the framing members spaced a maximum of 8" v.c. for walls with Cement Board Steel Screws. A 3/8' minimum fastener penetration into the steel framing members is required. Position perimeter fasteners at least 3/8" and less than 5/8" from ends and edges. Drive fasteners in field of panel first, working towards ends and edges. Hold panel in firm contact with framing members while driving fasteners. Drive fasteners so bottom of heads are flush with surface of panel to provide firm panel contact with the framing members. Do not drive fastener heads below panel surface. 4 Starter Track and Casing Bead trim components shall be installed at head, jambs and sill prior to installing the Cement Board Panels. A 3/8' to 1/2' gap shall be left between the Casing Bead component and the edge of the window or door for subsequent application of backer rod and sealant. 5 Once the Cement Board Panels have been fastened, drive all spacer screws or nails flush with the board. D Inspection and Preparation for Finish. Perform the following before proceeding with installation of basecoat and insulation board. 1 Inspect exterior cement board to ensure that it is securely fastened to framing and free of voids, surface delaminations, projections, or surface deterioration. Check to ensure that exterior surface is flat and within the dimensional tolerance of 1/4 inch in 4 feet, both directions. Repair and/or replace any defects in the cement board panels or weather resistive barrier 2. Provide sufficient personnel, scaffolding, and utilities such that adequate quantities of basecoat and finish materials can be mixed and applied to ensure continuous application, between natural breaks in the wall such as corners and control joints. E. Install trim accessories at locations indicated. Mechanically fasten accessories to framing members, concrete, or masonry F Steel Framed Construction: Using a stainless steel trowel, apply a 1/16" minimum thick, uniform layer of Exterior Basecoat or Exterior Acrylic Component over the Cement board Panel after joints and trim areas have cured a minimum of 4 hours. Apply the material by scratching in an initial coat. Then, immediately embed Exterior Standard Reinforcing Mesh, with its concave surface facing the wall, and smooth with a trowel until the mesh is fully embedded. Smooth out wrinkles by working from the center to the edges. Exterior Standard Reinforcing Mesh shall be lapped a minimum of 2' on all sides of each piece. After several minutes of mesh embedment and while the previously applied base coat is still relatively fresh (but firm), the applicator shall double -back with additional base coat and smooth the surface to give a final minimum base coat thickness of 3/32' The pattern of the mesh shall not be visible beneath the surface of the base coat after installation. G. Do not apply Exterior Basecoat or Exterior Acrylic Component material greater than 1/8' thick in a single application. To fill and level surface depressions caused by framing irregularities, apply Exterior Basecoat- Fiber Reinforced to low areas, scratching and doubling up to a thickness of 1/8' to 1/4' Trowel flush with adjacent areas. Leave surface smooth and flat. Allow base coat to cure or dry for 24 hours before application of Exterior Primer or Exterior Textured Finish. MAHLUM NORDFORS McKIT LEY GORDON SECTION 07242 PAGE 7 OLYMPIC MEMORIAL HOSPITAL DIRECT APPLIED EXTERIOR FINISH 2 MAIN /SURGERY ADDITIONS ALTERATIONS SYSTEM H. Apply Exterior Primer over the basecoat prior to the application of Exterior Fine Textured Finish. Inspect basecoat for defects and repair prior to application of the Exterior Primer Mix the Exterior Primer according to the instructions printed on the container. Primer can be tinted to the shade of the finish color Apply primer with a 3/8' nap roller or good latex paintbrush. When priming areas that cannot be rolled, use a maximum 1 -1/2' wide brush to avoid banding lines. Allow primer to dry thoroughly before application of the finish coat. Maintain temperatures above 40 °F and protect from rain during application and drying. I. Inspect basecoat for defects and repair prior to application of the finish. J Mix the exterior finish material according to the instructions printed on the container Trowel apply exterior finish material in a minimum 1/16" thick uniform layer over base coated surfaces. Do not add sand or other additives to create heavier textures. The exterior finish material is not designed for texture heavier than 3/16' Apply finish in a continuous operation, maintaining a wet edge to avoid cold joints or scaffolding lines. Terminate continuous application of finish at joints and corners only Sufficient manpower and scaffolding shall be employed to ensure continuous application and a uniform finished appearance. Apply finish using the same techniques and tools as used for approved samples. Texture finish to match the approved samples using only plastic or wood floats. Bring finish only a short distance into sealant joints (approximately 1/16 such that sealant materials bonds primarily (90 to the basecoat, but still covers the edge of the finish. K. Apply finish color and textures to areas shown on the drawings. Allow finish to dry for a minimum of 24 hours. Protect finish from weather, dust and physical contact until fully dried. 3.5 CLEANING AND PROTECTION A. Remove temporary covering and protection of other work. Promptly remove coating materials from window and door frames and other surfaces outside areas indicated to receive system coatings. B. Provide final protection and maintain conditions in a manner acceptable to Installer and system manufacturer that ensures systems being without damage or deterioration at time of Substantial Completion. 0 1997 Mahlum Nordfor: McKinley Gordon END OF SECTION 07242 MAHLUM NORDFORS McICINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Divisions 0 and 1 apply to the work specified in this section. 1.2 SUMMARY A. Provide materials, labor equipment, inspection, coordination, and supervision necessary for the best installation per industry standards of fireproofing as indicated in this specification and the project drawings. B. Work includes: 1. Fireproofing of structural steel 2. Installation of accessories C. Related work specified elsewhere includes: 1 Structural steel, Section 05120, Structural Steel 3 Miscellaneous metal, Section 05500 Metal Fabrications 4 Painting, Section 09900, Painting 5 Fire protection, Division 15, Mechanical 6 Mechanical ductwork, Division 15 Mechanical SECTION 07251 PAGE 1 FIREPROOFING D Interior applications are defined as conditioned spaces, protected from weather 1.3 SUBMITTALS A. General. Comply with Section 01300 Submittals. B. Product Data: Submit manufacturer's product data for each fireproofing product indicated. C. Quality Control Submittals: Test results of in -place performance as required in Part 3 D Shop Drawings: Installation methods of all fireproofing. All shop drawings shall be submitted to the City of Port Angeles Building Department for review and approval. Installation of fireproofing cannot begin until approval of the shop drawings from the city 1.4 QUALITY ASSURANCE A. General. Comply with Section 01400, Quality Control. B. Single -Source Responsibility For each type of fireproofing product, obtain all materials from a single manufacturer C. Fire Performance Requirements: Provide materials and construction identical to those tested by UL for assemblies indicated by reference to "Fire Resistance Directory" design numbers. D Maximum Allowable Asbestos Content: Material shall be 100 percent free of asbestos and mineral wool. E. Application Qualifications: Applicators bidding on this work represent that they are fully apprised of the specified manufacturer's installation techniques and standards. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.5 DELIVERY STORAGE, AND HANDLING A. Comply with Section 01615 Delivery Storage, and Handling. SECTION 07251 PAGE 2 FIREPROOFING B. Attach UL labels for fire resistance ratings applicable to project to containers. C. Do not use materials beyond manufacturer's indicated shelf life. Remove from project site and discard materials whose shelf life has expired. D Store materials inside, under cover, and above ground, keeping materials dry until used. Remove from project site and discard materials exposed to moisture or otherwise deteriorated. 1.6 PROJECT CONDITIONS A. Verify conditions at site affecting work to ensure the best installation per industry standards. B. Do not install sprayed -on fireproofing when ambient or substrate temperatures are 40 degrees F and falling, unless temporary protection and heat are provided to maintain both temperatures at or above 40 degrees F for 24 hours before, during, and for 24 hours after application of sprayed -on fireproofing. Ventilate fireproofing by means of natural circulation or, where this is inadequate, by forced air circulation during and after application, until fireproofing dries thoroughly 1.7 SCHEDULING A. Comply with Section 01310 Progress Schedule. B. Sequence and coordinate application of fireproofing with related work specified in other sections to comply with the following requirements: 1 Install fireproofing prior to installation of enclosing or concealing work, allowing sufficient time for inspection, testing, and correction of defective fireproofing. 2. Prevent deterioration of fireproofing for interior applications due to exposure to unfavorable environmental conditions. 3 Protect fireproofing from abrasion and other damage likely to occur during construction operations subsequent to its application. PART 2- PRODUCTS 2.1 CEMENTTTIOUS FIREPROOFING A. Acceptable Manufacturers 1 Grace Company 2. Isolator International Cafco 300 Cementitious Fireproofing 3 Others as approved by addenda B. Quality Standard Product: "MK-6" as manufactured by W.R. Grace Company 2.2 MATERIALS A. General. Provide all materials to allow for a the best installation per industry standards. B. Cementitious Fireproofing: Provide cementitious fireproofing exactly as specified for the UL assemblies indicated. Note: fibrous fireproofing not allowed. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.3 ACCESSORIES SECTION 07251 PAGE 3 FIREPROOFING A. General. Provide accessory materials as required, approved by fireproofing manufacturer and by UL for use in fire- resistance rated designs indicated and as required for the best installation per industry standards. B. Bonding Agent/Substrate Primer Fireproofing manufacturer's recommended type for conditions of exposure and substrate indicated. C. Metal Lath. Expanded metal lath of weight, configuration, material, and finish required to comply with fire resistance rated designs indicated and fireproofing manufacturer's recommendations. Provide clips, lathing accessories, and other anchorage devices required to attach lath to substrates. D Reinforcing Fabric: Glass fiber fabric of type, weight, and form required for fire resistance rated designs indicated and approved by fireproofing manufacturer E. Topcoat/Sealer Fireproofing manufacturer's recommended protective coating for sealing fireproofing material in application indicated, or where needed to comply with performance requirements specified elsewhere. F Water Clean, cool, potable, and free of organic and mineral impurities. PART 3 EXECUTION 3.1 EXAMINATION A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work will be construed as acceptance of conditions. B. Verify satisfactory condition of substrates to receive fireproofing, as follows: 1 Verify that substrates comply with requirements of sections in which they and related work are specified. 2. Verify that objects which will penetrate fireproofing, such as clips, hangers, support sleeves, etc. are securely attached to substrate. 3 Verify that substrates are not obstructed by ducts, piping, equipment, or other suspended construction which might interfere with application of fireproofing. 4 Verify that application of roofing on metal decking, if indicated, has been completed and that roofing traffic is prohibited during fireproofing application and until fireproofing has dried. 5 Where oils, paints, primer, rolling compounds, or unidentified substances capable of impairing fireproofing bond are suspected on substrate, conduct fireproofing manufacturer's recommended test to determine presence and effect on adhesion. 3.2 PREPARATION A. General. Prepare substrates and connecting work to enable the best installation per industry standards of the work of this section. MAHLUM NORDFORS McIZINLEY GORDON SECTION 07251 PAGE 4 OLYMPIC MEMORIAL HOSPITAL FIREPROOFING 2 MAIN /SURGERY ADDITIONS ALTERATIONS B. Protection 1 Provide drop cloths, masking, or other satisfactory coverings for materials not to receive fireproofing, in order to prevent damage from fallout or overspray of fireproofing materials. 2. Take necessary precautions to protect workmen, the public, and the environment during "application. Provide temporary enclosure as required to confine spraying operations. Ensure adequate ventilation and temperature. C. Surface Preparation 1 Clean substrates, removing dirt, dust, oil, grease, rolling compounds, loose material, paints, or other substances which might impair bonding of fireproofing to substrate. 2. Verify compatibility of surfaces to receive fireproofing. 3.3 INSTALLATION A. Install fireproofing and accessory materials in accordance with UL "Fire Resistance Directory" instructions for assemblies indicated, and with fireproofing manufacturer's instructions for mixing and application. Use only equipment approved by fireproofing manufacturer for conveying and dispersal of fireproofing. B. Install metal lath if required to achieve fire- resistance rating, or if required to comply with fireproofing manufacturer's recommendation for indicated application. Secure lath to substrate in position required, using fireproofing manufacturer's recommended anchorage devices and methods. Attach lathing accessories where indicated or required. C. Install reinforcing fabric if indicated or required. D Extend fireproofing full thickness over entire area of each substrate indicated. Install fireproofing in a single course unless otherwise recommended by manufacturer E. Apply fireproofing in thicknesses and densities indicated, but not less than required to achieve fire resistance ratings designated for each condition. F Apply fireproofing by spraying material on substrate wherever conditions permit. Complete coverage of miscellaneous areas by trowel application or other placement method recommended by fireproofing manufacturer, following spraying application in each area. G. Cure fireproofing according to manufacturer's instructions. 3.4 FIELD QUALITY CONTROL A. Comply with Section 01400 Quality Control. B. Provide experienced supervision of all elements of the work of this section. 3.5 CLEANING AND PROTECTION A. Comply with Section 01500, Construction Facilities and Temporary Controls, and Section 01710, Cleaning. B. Remove application equipment immediately upon completion of spraying operations within each containable area. Remove overspray and fallout materials from surfaces not to receive fireproofing while fireproofing is still wet and before fireproofing has begun to set. Clean exposed surfaces to remove evidence of soiling. MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07251 PAGE 5 FIREPROOFING C. Follow instructions of fireproofing manufacturer and installer to prevent damage to fireproofing by subsequent construction operations. D Coordinate installation of fireproofing with other work to minimize cutting or removal of fireproofing by other trades. E. Repair or replace work which has not been successfully protected or has been removed by other trades. 3.6 SCHEDULE A. Provide cementitious fireproofing throughout to provide resistive ratings for steel structural members. provide cementitious fireproofing at all exposed steel structures per requirements of UBC Chapter 43 UL Fire Resistive Index, and other governing codes to achieve the following levels of protection. B. Primary structural members include columns, beams and joists. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 07251 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary C onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY SECTION 07270 PAGE 1 FIRESTOPPING AND SMOKESTOPPING A. This Section includes firestopping and smokestopping for the following: 1 Penetrations through fire resistance -rated floor and roof construction including both empty openings and openings containing cables, pipes, ducts, conduits, and other penetrating items. 2. Penetrations through fire- resistance -rated walls and partitions including both empty openings and openings containing cables, pipes, ducts, conduits, and other penetrating items. 3 Penetrations through smoke barriers and construction enclosing compartmentalized areas involving both empty openings and openings containing penetrating items. 4 Sealant joints in fire- resistance-rated construction. B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 7 Section "Joint Sealants" for non fire resistive -rated joint sealants. 2. Division 15 Sections specifying ducts and piping penetrations. 3 Division 16 Sections specifying cable and conduit penetrations. 1.3 SYSTEM PERFORMANCE REQUIREMENTS A. General. Provide firestopping systems that are produced and installed to resist the spread of fire, according to UBC 4308 and the requirements indicated, and the passage of smoke and other gases. B. F -Rated Through- Penetration Firestop Systems: Provide through penetration firestop systems with F ratings indicated, as determined per ASTM E 814 but not less than that equaling or exceeding the fire- resistance rating of the constructions penetrated. C. T -Rated Through- Penetration Firestop Systems: Provide through penetration firestop systems with T ratings, in addition to F ratings, as determined per ASTM E 814 where indicated and where systems protect penetrating items exposed to contact with adjacent materials in occupiable floor areas. T -rated assemblies are required where the following conditions exist: 1 Where firestop systems protect penetrations located outside of wall cavities. 2. Where firestop systems protect penetrations located outside fire resistive shaft enclosures. 3 Where firestop systems protect penetrations located in construction containing doors required to have a temperature-rise rating. 4 Where firestop systems protect penetrating items larger than a 4- inch diameter nominal pipe or 16 sq. in. in overall cross sectional area. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07270 PAGE 2 FIRESTOPPING AND SMOKESTOPPING D Fire- Resistive Joint Sealants: Provide joint sealants with fire resistance ratings indicated, as determined per ASTM E 119 but not less than that equaling or exceeding the fire- resistance rating of the construction in which the joint occurs. E. For firestopping exposed to view traffic, moisture, and physical damage, provide products that do not deteriorate when exposed to these conditions. 1. For floor penetrations with annular spaces exceeding 4 inches or more in width and exposed to possible loading and traffic, provide firestop systems capable of supporting the floor loads involved either by installing floor plates or by other means. 2. For penetrations involving insulated piping, provide through penetration firestop systems not requiring removal of.insulation. F For firestopping exposed to view provide products with flame spread values of less than 25 and smoke developed values of less than 450, as determined per ASTM E 84 1.4 SUBMITTALS A. General. Submit the following according to Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of product specified. C. Certification by firestopping manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds (VOCs) and are nontoxic to building occupants. D Shop drawings detailing materials, installation methods, and relationships to adjoining construction for each through- penetration firestop system, and each kind of construction condition penetrated and kind of penetrating item. Include firestop design designation of qualified testing and inspecting agency evidencing compliance with requirements for each condition indicated. E. Submit documentation, including illustrations, from a qualified testing and inspecting agency that is applicable to each through penetration firestop configuration for construction and penetrating items. F Product certificates signed by manufacturers of firestopping products certifying that their products comply with specified requirements. G. Product test reports from, and based on tests performed by a qualified testing and inspecting agency evidencing compliance of firestopping with requirements based on comprehensive testing of current products. H. Qualification data for firms and persons specified in "Quality Assurance" article to demonstrate their capabilities and experience. Include list of completed projects with project names, addresses, names of Architects and Owners, and other information specified. 1.5 QUALITY ASSURANCE A. Fire- Test Response Characteristics: Provide firestopping that complies with the following requirements and those specified under the "System Performance Requirements" article: 1 Firestopping tests are performed by a qualified testing and inspecting agency A qualified testing and inspecting agency is UL or Warnock Hersey MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07270 PAGE 3 FIRESTOPPING AND SMOKESTOPPING 2. Through- penetration firestop systems are identical to those tested per ASTM E 814 under conditions where positive furnace pressure differential of at least 0 01 inch of water is maintained at a distance of 0 78 inch below the fill materials surrounding the penetrating items in the test assembly Provide rated systems complying with the following requirements: a. Through- penetration firestop system products bear classification marking of qualified testing and inspecting agency b. Through- penetration firestop systems correspond to those indicated by reference to through penetration firestop system designations listed by UL in their "Fire Resistance Directory or by Warnock Hersey 3 Fire- resistive joint sealant systems are identical to those tested for fire response characteristics per ASTM E 119 under conditions where the positive furnace pressure differential is at least 0.01 inch of water, as measured 0 78 inch from the face exposed to furnace fire. Provide systems complying with the following requirements: a. Fire- Resistance Ratings of Joint Sealants: As indicated by reference to design designations listed by UL in their "Fire Resistance Directory" b. Joint sealants, including backing materials, bear classification marking of qualified testing and inspection agency B. Information on drawings referring to specific design designations of through- penetration firestop systems is intended to establish requirements for performance based on conditions that are expected to exist during installation. Any changes in conditions and designated systems require the Architect's prior approval. Submit documentation showing that the performance of proposed substitutions equals or exceeds that of the systems they would replace and are acceptable to authorities having jurisdiction. C. Installer Qualifications: Engage an experienced Installer who has completed firestopping that is similar in material, design, and extent to that indicated for Project and that has performed successfully D Single -Source Responsibility Obtain through- penetration firestop systems for each kind of penetration and construction condition indicated from a single manufacturer E. Provide firestopping products containing no detectable asbestos as determined by the method specified in 40 CFR Part 763 Subpart F Appendix A, Section 1, "Polarized Light Microscopy F Coordinating Work: Coordinate construction of openings and penetrating items to ensure that designated through penetration fire-stop systems are installed per specified requirements. 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver firestopping products to Project site in original, unopened containers or packages with intact and legible manufacturers' labels identifying product and manufacturer date of manufacture; lot number shelf life, if applicable; qualified testing and inspecting agency's classification marking applicable to Project; curing time; and mixing instructions for multicomponent materials. B. Store and handle firestopping materials to prevent their deterioration or damage due to moisture, temperature changes, contaminants, or other causes. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.7 PROJECT CONDITIONS SECTION 07270 PAGE 4 FIRESTOPPING AND SMOKESTOPPING A. Environmental Conditions: Do not install firestopping when ambient or substrate temperatures are outside limits permitted by firestopping manufacturers or when substrates are wet due to rain, frost, condensation, or other causes. B. Ventilation: Ventilate firestopping per firestopping manufacturers' instructions by natural means or, where this is inadequate, forced air circulation. C. Coordination: Prior to the start of work which involves cutting openings in fire wall construction for penetrations, conduct a meeting with installers of such work to identify fire and smoke barriers and required configurations of penetrations and to discuss the proper procedures and time schedule for cutting, patching, and sealing penetrations in such assemblies, with emphasis on avoiding unnecessary cutting and patching. 1.8 SCHEDULING A. Perform firestopping and smokestopping work after completion of work which penetrates fire and smoke barriers, but prior to covering up or eliminating access to the penetration. Coordinate with installers of such other work. PART 2- PRODUCTS 2.1 FIRESTOPPING, GENERAL d. Fire -rated formboard. e. Joint fillers for joint sealants. 2. Temporary forming materials. 3 Substrate primers. 4 Collars. 5 Steel sleeves. 1 1 1 1 1 1 1 1 1 A. Compatibility Provide firestopping composed of components that are compatible with each other, the substrates forming openings, and the items, if any penetrating the firestopping under conditions of service and application, as demonstrated by firestopping manufacturer based on testing and field experience. B. Accessories: Provide components for each firestopping system that are needed to install fill materials and to comply with "System Performance Requirements" article in Part 1 Use only components specified by the firestopping manufacturer and approved by the qualified testing and inspecting agency for the designated fire- resistance-rated systems. Accessories include but are not limited to the following items: 1 Permanent forming damming /backing materials including the following: a. Semirefractory fiber (mineral wool) insulation. b. Ceramic fiber c. Sealants used in combination with other forming/damming materials to prevent leakage of fill materials in liquid state. 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.2 MATERIALS SECTION 07270 PAGE 5 FIRESTOPPING AND SMOKESTOPPING A. Firestopping Materials 1 Provide penetration seal assemblies whose fire resistance ratings have been determined by testing in the configurations required and which have fire- resistance ratings at least as high as that of the fire -rated assembly in which they are to be installed. 2. Use the materials required for the tested assemblies indicated on the drawings. Where no tested assembly is indicated for a particular penetration, use a fire protection engineered assembly backed in writing by the firestop manufacturer which complies with the requirements of the specification. 3 Provide products which. a. Allow normal expansion and contraction movement of the penetrating item without failure of the penetration seal. b. Emit no hazardous, combustible, or irritating by- products during installation or curing period. c. Do not require special tools for installation. d. Do not require hazardous waste disposal. B. Smokestopping Materials 1 Use any gunnable or pourable joint sealant suitable for the application. Use only fully curing types where accessible in the finished work. 2. Provide products which. a. Allow normal expansion and contraction movement of the penetrating item without failure of the penetration seal. b Emit no hazardous, combustible, or irritating by- products during installation or curing period. c. Do not require special tools for installation. d. Do not require hazardous waste disposal. C. Labels 1 Red, permanent marking using the words 'Fire -Rated Assembly Do Not Disturb, See Maintenance Instructions" or equivalent as approved by the authority having jurisdiction. 2. For marking fire and smoke barriers themselves, use letters at least 2 inches high. 2.3 MANUFACTURERS A. Acceptable Manufacturers 1. Bio Fireshield, Inc. 2. Dow Corning Corporation 3 General Electric Company 4 3M Fire Protection Products MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3- EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions, with Installer present, for compliance with requirements for opening configurations, penetrating items, substrates, and other conditions affecting performance of firestopping. Do not proceed with installation until unsatisfactory conditions have been corrected. J 3.2 PREPARATION A. Surface Cleaning: Clean out openings and joints immediately prior to installing firestopping to comply with recommendations of firestopping manufacturer and the following requirements: 1 Remove all foreign materials from surfaces of opening and joint substrates and from penetrating items that could interfere with adhesion of firestopping. 2. Clean opening and joint substrates and penetrating items to produce clean, sound surfaces capable of developing optimum bond with firestopping. Remove loose particles remaining from cleaning operation. 3 Remove laitance and form release agents from concrete. B. Priming Prime substrates where recommended by firestopping manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not allow spillage and migration onto exposed surfaces. C. Masking Tape: Use masking tape to prevent firestopping from contacting adjoining surfaces that will remain exposed upon completion of Work and that would otherwise be permanently stained or damaged by such contact or by cleaning methods used to remove smears from firestopping materials. Remove tape as soon as it is possible to do so without disturbing firestopping's seal with substrates. 3.3 INSTALLING THROUGH PENETRATION FIRESTOPS SECTION 07270 PAGE 6 FIRESTOPPING AND SMOKESTOPPING A. General. Comply with the "System Performance Requirements" article in Part 1 and the through- penetration firestop manufacturer's installation instructions and drawings pertaining to products and applications indicated. B. Install forming/damming materials and other accessories of types required to support fill materials during their application and in the position needed to produce the cross sectional shapes and depths required to achieve fire ratings of designated through penetration firestop systems. After installing fill materials, remove combustible forming materials and other accessories not indicated as permanent components of firestop systems. C. Install fill materials for through penetration firestop systems by proven techniques to produce the following results: 1 Completely fill voids and cavities formed by openings, forming materials, accessories, and penetrating items. 2. Apply materials so they contact and adhere to substrates formed by openings and penetrating items. 3 For fill materials that will remain exposed after completing Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 INSTALLING FIRE- RESISTIVE JOINT SEALANTS 3.5 FIELD QUALITY CONTROL SECTION 07270 PAGE 7 FIRESTOPPING AND SMOKESTOPPING A. General. Comply with the "System Performance Requirements" article in Part 1, with ASTM C 1193 and with the sealant manufacturer's installation instructions and drawings pertaining to products and applications indicated. B. Install joint fillers to provide support of sealants during application and at position required to produce the cross sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability and develop fire resistance rating required. C. Install sealants by proven techniques that result in sealants directly contacting and fully wetting joint substrates, completely filling recesses provided for each joint configuration, and providing uniform, cross sectional shapes and depths relative to joint width that optimum sealant movement capability Install sealants at the same time joint fillers are installed. D Tool nonsag sealants immediately after sealant application and prior to the time skinning or curing begins. Form smooth, uniform beads of configuration indicated or required to produce fire- resistance rating, as well as to eliminate air pockets, and to ensure contact and adhesion of sealants with sides of joint. Remove excess sealant from surfaces adjacent to joint. Do not use tooling agents that discolor sealants or adjacent surfaces or are not approved by sealant manufacturer A. Inspecting agency employed and paid by Owner will examine completed firestopping to determine, in general, if it is being installed in compliance with requirements. B. Inspecting agency will report observations promptly and in writing to Contractor and Architect. C. Do not proceed to enclose firestopping with other construction until reports of examinations are issued. D Where deficiencies are found, repair or replace firestopping so that it complies with requirements. 3.6 CLEANING A. Clean off excess fill mate and sealants adjacent to openings and joints as work progresses by methods and with cleaning materials approved by manufacturers of firestopping products and of products in which opening and joints occur B. Protect firestopping during and after curing period from contact with contaminating substances or from damage resulting from construction operations or other causes so that they are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated firestopping immediately and install new materials to produce firestopping complying with specified requirements. MAIILUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.7 SCHEDULE Construction Condition A. Metal pipe or conduit through framed walls B. Metal pipe or conduit through concrete and masonry walls and floors C. Insulated metal pipe through framed walls D Insulated metal pipe through concrete and masonry walls and floors E. Plastic pipe through framed walls Manufacturer Bio Fireshield OR Bio Fireshield OR 3M OR Specified Technologies Bio Fireshield OR Bio Fireshield OR 3M OR Specified Technologies 3M OR Bio Fireshield OR Specified Technologies 3M OR Bio Fireshield OR Specified Technologies 3M OR Bio Fireshield OR Specified Technologies SECTION 07270 PAGE 8 FIRESTOPPING AND SMOKESTOPPING Product* BFS100 Biostop 500 CP2SWB+ SpecSeal Series 100 Sealant/Putty BFS200 BFS100 CP25WB+ SpecSeal Series 100 Sealant/Putty FS195 CP25N /S Biostop 500 SpecSeal Series 100 Sealant/Putty see appropriate listing Biostop 500 SpecSeal Series 100 Sealant, Wrap Strip or Mortar FS195 CP25N /S, RC1 BFS1 -9 BCF Series SpecSeal Series 100 Sealant, Wrap Strip or Collar Installation Spec Architectural Detail 1 UL System WL1021 UL System 147A UL System WL -1028, 1029 Architectural Detail 2 UL System CAJ1031 UL System 319 UL System CAJ1079 1142 UL System 147 UL System WL5015 UL System WL -5033 5014 1049 UL Systems 91 152, 203 UL System CAJ5015 UL System CAJ5042, 5051 UL System 148 Manufacturer's Specification UL System WL -2047 2046, 2048, 2029 2059 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS Construction Condition F Plastic pipe through concrete and masonry walls and floors 01 Cable tray through concrete and masonry walls and floors G2. Framed walls OR G3 Alternately terminate cable tray prior to firewall (designer modify) H. Telephone, fiber optic, and other small miscellaneous conductors through framed walls I. Control joints, wall/floor joints, framed, concrete, and masonry J Curtain wall/construction gap Manufacturer 3M OR Bio Fireshield OR Specified Technologies 3M CP25N /S, CP25S/L OR Bio Fireshield BFS 100, BFS200 OR 3M CP25N /S, CP25S/L SECTION 07270 PAGE 9 FIRESTOPPING AND SMOKESTOPPING Product* CS195, FS195 CP25N /S, CP25S/L BFS1 -9 BCF Series SpecSeal Series 100 Sealant, Wrap Strip or Collar Installation Spec UL System 64 Manufacturer's specifications UL System CAJ2031, 2064 2038, 2045, 2063 Bio Fireshield K10 UL System CAJ4010 OR 3M CS195 UL System 105 or 66 OR Specified SpecSeal Mortar UL System CAJ8016 Technologies Bio Fireshield K10 Architectural Detail 15 OR 3M CS195 UL System 557 OR Specified SpecSeal Series 100 UL System WL -4005 Technologies Sealant Bio Fireshield BFS100 Architectural Detail 4 OR Specified SpecSeal Series 100 Technologies Sealant or Putty Bio Fireshield OR 3M CP25N /S UL System 149 OR Specified SpecSeal Series 100 UL System 3024 3025 Technologies Sealant or Putty Bio Fireshield BFS100 BFS200 Manufacturer's OR Specifications UL System WL -3024 3025 8003 BFS100 BFS200 UL System 247 Manufacturer's specifications Install UL -rated assembly that meets ASTM C920, class A movement MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS Construction Condition K. Noninsulated HVAC ducts L. Seismic and other large building joints 0 1997 Mahlum Nordfors McKinley Gordon OR Install UL -rated assembly that meets ASTM C920, class A movement 1 Manufacturer Bio Fireshield OR 3M OR Specified Technologies SECTION 07270' PAGE 10 FIRESTOPPING AND SMOKESTOPPING Product* BFS100, BFS200 CP25N /S, CP25S/L SpecSeal Series 100 Sealant Installation Spec Manufacturer's specifications Obtain manufacturer's engineering recommendation Any UL listed system OR Install UL -rated assembly that meets ASTM C920, class A movement *See UL Listing or manufacturer's specifications for associated components not listed (i.e. sleeves, collars, mineral wool, etc.). Insulated cable, bus ducts, glass pipe, and other penetrations and construction conditions not listed above shall be firestopped with an approved UL System as defined by the Fire Resistance Directory END OF SECTION 07270 1 1 a 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes manufactured wall panels of the following type: 1 Field assembled wall panels with exposed fasteners. 1.3 SYSTEM PERFORMANCE REQUIREMENTS SECTION 07412 PAGE 1 MANUFACTURED WALL PANELS B. Related Sections: The following sections contain requirements that relate to this Section. 1 Division 5 Section `Structural Steel' for structural and light gage framing 2. Division 7 Section `Sheet Metal Flashing and Trim' for copings, flashing, fascias and other sheet metal trim. 3 Division 7 Section "Joint Sealants" for field- applied panel sealants. A. Provide certified test results by a recognized testing laboratory or agency in accordance with specified test methods for each system. 1.4 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B Product data including manufacturer's product specifications, standard details, certified product test results, installation instructions, and general recommendations, as applicable to materials and finishes for each component and for total panel system. C. Shop Drawings showing layouts of panels on walls and roofs, details of edge conditions, joints, corners, panel profiles, supports, anchorages, trim, flashings, closures, and special details. Distinguish between factory and field assembly work. 1.5 QUALITY ASSURANCE A. Field Measurements: Where possible, prior to fabrication of panels, take field measurements of structure or substrates to receive panel system. Allow for trimming panel units where final dimensions cannot be established prior to fabrication. 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver panels and other components so they will not be damaged or deformed. Package wall and roof panels for protection against transportation damage. B. Handling: Exercise care in unloading, storing, and erecting wall and roof covering panels to prevent bending, warping, twisting, and surface damage. C. Stack materials on platforms or pallets, covered with tarpaulins or other suitable weathertight ventilated covering. Store metal wall and roof panels so that they will not accumulate water Do not store panels in contact with other materials that might cause staining, denting, or other surface damage. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.7 WARRANTY PART 2 PRODUCTS 2.1 MANUFACTURERS 2.2 SHEET MATERIALS 2.3 METAL FINISHES SECTION 07412 PAGE 2 MANUFACTURED WALL PANELS A. Finish Warranty Furnish panel manufacturer's written warranty covering failure of the factory- applied exterior finish on metal wall and roof panels within the warranty period. This warranty shall be in addition to and not a limitation of other rights the Owner may have against the Contractor, under the Contract Documents. 1. Warranty period for factory- applied exterior finishes on wall and roof panels is 20 years after the date of Substantial Completion. A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering metal roof or wall panel systems that may be incorporated in the work include but are not limited to the following: 1 Steel Wall Panels: a. Allied Roof System. b Architectural Panels, Inc. c. ASC Pacific, Inc. d. Atlas Aluminum Corp. e. Berridge Manufacturing Co. f. Butler Manufacturing Co. g. Copper Sales, Inc. h. Inryco Architectural Products. i. MM Systems Corp. j. H.H. Robertson Company A. Structural Quality Galvanized Steel Sheet: Hot -dip zinc coated steel sheet complying with ASTM A 446 with G90 coating complying with ASTM A 525 Grade C or to suit manufacturer's standards. A. General. Apply coatings either before or after forming and fabricating panels, as required by coating process and as required for maximum coating performance capability Protect coating either by application of strippable film or by packing plastic film or other suitable material between panels in a manner to properly protect the finish. Furnish air -drying spray finish in matching color for touch -up. 1 Color As selected by the Architect from the manufacturer's standard colors. B. Fluoropolymer Coating: Manufacturer's standard two -coat, thermo- cured, full- strength 70 percent "Kynar 500" coating consisting of a primer and a minimum 0 75 -mil dry film thickness with a total minimum dry film thickness of 0 9 mil and 30 percent reflective gloss when tested in accordance with ASTM D 523 1 Durability Provide coating that has been field tested under normal range of weathering conditions for minimum of 20 years without significant peel, blister, flake, chip, crack, MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS or check in finish; without chalking in excess of No. 8 in accordance with ASTM D 659• and without fading in excess of 5 NBS units. 2.4 MISCELLANEOUS MATERIALS SECTION 07412 PAGE 3 MANUFACTURED WALL PANELS A. Fasteners: Self tapping screws, bolts, nuts, self locking rivets, self locking bolts, end welded ktuds, and other suitable fasteners designed to withstand design loads. 1. Use aluminum, corrosion resistant steel, or stainless steel fasteners for exterior application and galvanized or cadmium- plated fasteners for interior applications. 2. Provide exposed fasteners with heads matching color of roof or wall panel by means of plastic caps or factory- applied coating. 3 Provide metal backed neoprene washers under heads of exposed fasteners bearing on weather side of panels. 4 Locate and space exposed fasteners in true vertical and horizontal alignment. Use proper tools to obtain controlled uniform compression for positive seal without rupture of neoprene washer. B. Accessories: Except as indicated as work of another specification section, provide components required for a complete wall panel system, including trim, copings, fascias, gravel stops, mullions, sills, corner units, ridge closures, clips, seam covers, battens, flashings, gutters, louvers, sealants, gaskets, fillers, closure strips, and similar items. Match materials and finishes of panels. C. Bituminous Coating: Cold- applied asphalt mastic, SSPC paint 12, compounded for 15 mil dry film thickness per coat. 2.5 PANEL FABRICATION A. General. Fabricate and finish panels and accessories at the factory to greatest extent possible, by manufacturer's standard procedures and processes, as required to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and dimensional requirements and with structural requirements. 13. Apply bituminous coating or other permanent separation materials on concealed panel surfaces where panels would otherwise be in direct contact with substrate materials that are noncompatible or could result in corrosion or deterioration of either material or finishes. 2.6 WALL PANELS A. Lap -Seam Wall Panels: Manufacturer's standard factory- formed lap -seam wall panel system designed for mechanical attachment of panels to supports using exposed fasteners and sealants. Form panels of 24 -gage (0 0239 -inch) zinc- coated or aluminum- zinc coated steel sheets. 'B. Profile: Manufacturer's standard S or `M' corrugated panel to match profile of existing metal wall panels. 2.7 PANEL SUPPORTS AND ANCHORAGE A. Secondary Framing: Provide the following secondary framing members: 1 Flange and Sag Bracing: 1 -5/8- by 1 -5/8 -inch angles fabricated from 16 -gage (0 0598 inch) shop painted, roll formed steel. 2. Base or Sill Angles: Fabricate from 14 -gage (0 0747 -inch) cold- formed galvanized steel sections. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3- FXECUTION 3.2 PANEL INSTALLATION 3.3 CLEANING AND PROTECTION 0 1997 Mahlum Nordfors McKinley Gordon SECTION 07412 PAGE 4 MANUFACTURED WALL PANELS 3 Secondary structural members, except columns and beams, shall be the manufacturer's standard sections fabricated from 14 -gage (0 0747 -inch) cold- formed galvanized steel. 3.1 PANE. SUPPORTS AND ANCHORAGE A. Girls, purlin, and other secondary structural panel support members and anchorage shall be installed in accordance with AISC Manual of Steel Construction "Code of Standard Practice." A. General. Comply with manufacturers' instructions and recommendations for installation, as applicable to project conditions and supporting substrates. Anchor panels and other components of the work securely in place, with provisions for thermal and structural movement. 1 Field cutting of exterior panels by torch is not permitted. 2. Install panels with exposed exterior and interior fasteners, prefinished to match panel finishes. B Accessories: Install components required for a complete wall panel system, including trim, copings, fascias, gravel stops, mullions, sills, corner units, ridge closures, clips, seam covers, battens, flashings, gutters, louvers, sealants, gaskets, fillers, closure strips, and similar items. C. Joint Sealers: Refer to other sections of these specifications for post installation requirements on joint sealers; not work of this section. A. Damaged Units: Replace panels and other components of the work that have been damaged or have deteriorated beyond successful repair by means of finish touch -up or similar minor repair procedures. B. Cleaning: Remove temporary protective coverings and strippable films (if any) as soon as each panel is installed. Upon completion of panel installation, clean finished surfaces as recommended by panel manufacturer and maintain in a clean condition during construction. END OF SECTION 07412 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 07530 PAGE 1 SINGLE -PLY MEMBRANE ROOFING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary c onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes single -ply membrane roofing systems. B. Types of roofing systems specified in this Section using single -ply roofing membranes include the following: 1 Fully adhered and ballasted systems. C. Single -ply roofing membranes include the following: 2. Polyvinyl chloride (PVC). D Roof insulation related to single -ply membrane roofing is specified in this Section. E. Wood Hailers, blocking, and other related items are specified in Division 6 Section `Rough Carpentry' F Copings and gravel stops are specified in Division 7 Section `Flashing and Sheet Metal' 1.3 SUBMITTALS A. General. Submit the following according to Conditions of Contract and Division 1 Specification Sections. B. Product data, installation instructions, and general recommendations from manufacturer of single -ply membrane system for types of roofing required. Include data substantiating that materials comply with requirements. C. Samples of finished roofing sheets, including T- shaped side/end -lap seam. Also include the following: 1 Aggregate ballast to show type, shape, color 2. Paver ballast to show size, color 3 Insulation board. D Shop drawings showing roof configuration, sheet layout, seam locations, colors (as applicable), details at perimeter, and special conditions. 1 Indicate layout of tapered insulation materials. 1.4 QUALITY ASSURANCE A. Manufacturer Obtain primary single -ply membrane roofing from a single manufacturer Provide secondary materials as recommended by manufacturer of primary materials. B Installer Engage an experienced Installer that has specialized in installing ,roofing systems similar to those required for this Project. Installer must be acceptable to or licensed by manufacturer of primary roofing material. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 WARRANTY PART 2- PRODUCTS 2.1 GENERAL B Fully Adhered PVC Membrane: Manufacturer's standard installation. SECTION 07530 PAGE 2 SINGLE -PLY MEMBRANE ROOFING 1. Work associated with single -ply membrane roofing, including (but not limited to) insulation, flashing, and membrane sheet joint sealers, is to be performed by Installer of this Work. C. Pre Roofing Conference: Before installing roofing and associated Work, meet at mutually agreed location with Installer, roofing manufacturer, installers of related work, and other entities concerned with roofing performance, including governing authorities, Architect, and Owner Record discussions and agreements and furnish copy to each participant. Provide at least 72 hours advance notice to participants prior to convening pre- roofing conference. D UL Listing: Provide labeled materials that have been tested and listed by UL in "Building Materials Directory" or by other nationally recognized testing laboratory for Class A rated materials/system. E. Factory Mutual. Provide materials with a Factory Mutual classification of FM I -90 1.5 PROJECT CONDITIONS A. Weather Proceed with roofing work when existing and forecasted weather conditions permit work to be performed in accordance with manufacturers' recommendations. and warranty requirements. B. Substrate Conditions: Do not begin roofing installation until substrates have been inspected and are determined to be in satisfactory condition. A. Manufacturer's Warranty Submit executed copy of single ply membrane manufacturer's "Limited Service Warranty" agreement including flashing endorsement, signed by an authorized representative of manufacturer Provide form that was published with product literature as of date of Contract Documents. B Warranty Period. 10 years from date of Substantial Completion. C. The warranty shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents. A. Compatibility Provide products recommended by manufacturers to be fully compatible with indicated substrates. Provide separation materials as required to eliminate contact between incompatible materials. 2.2 POLYVINYL CHLORIDE (PVC) MEMBRANE A. General. Virgin polyvinyl chloride (PVC) with plasticizers and modifiers, formed into uniform flexible sheets, complying with ASTM D 4434 Type to suit project. 1 Thickness: 50 mils, nominal. 2. Membrane Reinforcing: Manufacturer's standard glass -fiber or polyester scrim. 3 Exposed Face Color White. 1 1 1 1 1 r t. t 1 1 r 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1 Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: a. GenFlex Roofing Systems, GenCorp Polymer Products. b. Sarnafil, Inc. c. Trocal Roofing Systems. d. Wat -Pro, Inc. e. Mule -Hide Products, Inc. 2.3 AUXILIARY MATERIALS SECTION 07530 PAGE 3 SINGLE -PLY MEMBRANE ROOFING A. Sheet Seaming System. Manufacturer's standard materials for sealing lapped joints, including edge sealer to cover exposed spliced edges as recommended by membrane manufacturer B. Cant Strips, Tapered Edge Strips, and Flashing Accessories: Types recommended by membrane manufacturer, including adhesive tapes, flashing cements, and sealants. C. Flashing Material. Manufacturer's standard system compatible with single -ply membrane. D Slip Sheet: Type recommended by membrane manufacturer for protecting membrane from incompatible substrates. E. Aggregate Surface Ballast: Washed, rounded, riverbed gravel or other acceptable smooth faced stone ranging in size from 1 to 2 inches in diameter Provide aggregate that will withstand weather exposure without significant deterioration and will not contribute to membrane degradation. F Concrete Paver Ballast: Prefabricated concrete pavers designed specifically for ballasting single -ply membranes, weighing approximately 12 psf with a minimum 2500 psi compressive strength. G. Membrane Adhesive: As recommended by membrane manufacturer for particular substrate and project conditions, formulated to withstand minimum 60 -psf uplift force. 2.4 INSULATING MATERIALS A. General. Provide insulating materials to comply with requirements indicated for materials and with referenced standards in sizes to fit applications indicated, selected from manufacturer's standard thicknesses, widths, and lengths. 1 Provide tapered boards where indicated for sloping to drain. Fabricate with taper of 1/4 inch per foot, unless otherwise indicated. B. Polyisocyanurate Board Roof Insulation. Rigid, cellular, thermal insulation with polyisocyanurate closed -cell foam core and manufacturer's standard facing laminated to both sides; complying with FS HH -I- 1972/2, Class 1, and having a minimum compressive strength of lS psi. 2.5 AUXILIARY INSULATION MATERIALS A. Adhesive for Bonding Insulation. Type recommended by insulation manufacturer and complying with fire resistance requirements. 1 Provide system tested and approved for I-60 wind -uplift rating. MAII.UM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION 3.1 PREPARING SUBSTRATE A. General. Comply with manufacturers' instructions to prepare substrate to receive single -ply membrane system. 1 Verify that penetrations, expansion joints, and blocking are in place and secured and that roof drains are properly clamped into position. B Clean substrate of dust, debris, and other substances detrimental to single -ply system installation. Remove sharp projections. C. Install cant strips, flashings, and accessory items as shown and as recommended by manufacturer D Prevent compounds from entering and clogging drains and conductors and from spilling or migrating onto surfaces of other work. 3.2 INSTALLING INSULATION A. General. Extend insulation full thickness in two layers, or in multiple layers over entire surface to be insulated, cutting and fitting tightly around obstructions. Form cant strips, crickets, saddles, and tapered areas with additional material as shown and as required for proper drainage of membrane. 1 Stagger joints in one direction for each course. For multiple layers, stagger joints in both directions between courses with no gaps, to form a complete thermal envelope. 2. Provide tapered units to suit drainage pattern indicated. B. Do not install more insulation in a day than can be covered with membrane before end of day or before start of inclement weather C. Provide protection sheet between insulation and membrane when recommended by membrane manufacturer 3.3 INSTALLING MEMBRANE SECTION 07530 PAGE 4 SINGLE -PLY MEMBRANE ROOFING A. General. Start installation only in presence of manufacturer's technical representative. 1 Cut out and repair membrane defects at the end of each day's work. B Fully Adhered Membrane' Install membrane by unrolling over prepared substrate, lapping adjoining sheets as recommended by manufacturer Apply adhesive to surfaces to be bonded and roll into place when adhesive has properly cured. Treat seams with special adhesive and apply sealant to exposed sheet edges, tapering application as recommended by manufacturer Install mechanical fasteners, flashings and counterflashings, and accessories at locations and as recommended by manufacturer 1 Apply aggregate ballast in uniform thickness at rate of 10 to 12 psf, spreading with care to minimize possibility of damage to membrane. C. Walkway Protection Install concrete ballast paver units at locations shown and where required for access, to roof mounted equipment. Place protection boards carefully to avoid damage to membrane, laying over an additional layer of roof membrane material, loosely applied, for additional protection. MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 PROTECTING ROOFING O 1997 Mahhun Nordfors McKinley Gordon SECTION 07530 PAGE 5 SINGLE -PLY MEMBRANE ROOFING A. After completing roofing (including associated work), institute appropriate procedures for surveillance and protection of roofing during remainder of construction period. At the end of the construction period, or at a time when remaining construction will in no way affect or endanger roofing, make a final inspection of roofing and prepare a written report to Owner, describing nature and extent of deterioration or damage found. B. Repair or replace (as required) deteriorated or defective work found at the time of final inspection to a condition free of damage and deterioration at` the time of Substantial Completion and according to the requirements of the specified warranty END OF SECTION 07530 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This Section includes the following: 1 Sheet metal flashing and trim 2. Copings 3 Flexible flashings 4 Fasteners and attachment devices 5 Coatings and slip sheets to isolate sheet metal from dissimilar materials 6. Metal shop sheet metal wainscot 1.3 PERFORMANCE REQUIREMENTS A. General. Comply with Section 01300, Submittals. SECTION 07600 PAGE 1 FLASHING AND SHEET METAL A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 9 Section `Gypsum Board Assemblies' for metal trim for gypsum drywall. 2. Division 10 Section `Louvers and Vents' for metal louvers. 3 Division 15 Mechanical for ductwork and ventilation accessories and equipment enclosures. C. Flashings which are integral with prefabricated roof accessories, equipment, and the like are not included in this section. D Wood blocking, nailers, edge strips, and battens are not specified in this section. A. General. Install sheet metal flashing and trim to withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failing. B Fabricate and install flashings at roof edges to comply with recommendations of FM Loss Prevention Data Sheet 1-49 for the following wind zone: 1 Wind Zone 1 Wind pressures of 21 to 30 psf (1.00 to 1 44 kPa). 2. Wind Zone 2 Wind pressures of 31 to 45 psf (1 48 to 2.15 kPa). 1.4 SUBMITTALS B. Product Data. Submit manufacturer's technical product data, installation instructions, and recommendations for use of each type of product required. Provide additional data as required to demonstrate compliance with project requirements. C. Samples: Submit 6- inch square samples of each type of metal and finish required. D Shop Drawings: Submit shop drawings showing layout, joining, profiles, and anchorages of fabricated work; layouts at scale of 1/4 inch per foot, details at scale of 3 inches per foot. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07600 PAGE 2 FLASHING AND SHEET METAL 1.5 QUALITY ASSURANCE A. Installer's Qualifications: A firm having 3 years successful experience, minimum, with installation of sheet metal work of type and scope equivalent to work of this section. B. Standards: Fabricate and install sheet metal work in accordance with Sheet Metal and Air Conditioning Contractors National Association (SMACNA) "Architectural Sheet Metal Manual," except where shown or specified otherwise. C. Wind Resistance: Fabricate and install flashings at edges of roof in accordance with Factory Mutual (FM) Loss Prevention Data 1-49 for specified wind zone. Ensure that substrate construction and anchorage also are in compliance. 1.6 PROJECT CONDITIONS A. Verify conditions at site affecting work to ensure the best and most complete installation per industry standards. B. Coordinate work of this section with interfacing and adjoining work for proper sequencing of each installation; Ensure best possible weather resistance and durability of work and protection of materials and finishes. PART2- PRODUCTS 2.1 MATERIALS A. Aluminum Sheet 1 ASTM B209 Type 3003 H14 2. B &S gage (0 032 inch) minimum.thickness, unless indicated otherwise 3 Provide fluoropolymer finish (Duranar Fluorocerm, Fluropon, or approved) with 70 percent minimum Kynar 500 Custom color as selected by Architect. B Sheet Lead: Hard tempered, containing 4 to 6 percent antimony 3 0 pounds per square foot minimum weight for exposed sheet. Soft lead sheet, 4 0 pounds per square foot minimum weight for concealed uses. C. Neoprene Flashing: Uncured neoprene sheet; minimum 60 -mil thickness; minimum properties as follows: 1. Tensile Strength. ASTM D412, 1305 pounds per square inch 2. Elongation. ASTM D412, 250 percent 3 Tear Resistance: ASTM D412, 150 pounds per inch 4 Ozone Resistance: ASTM D1149 no cracks after 168 -hour exposure to one part per million ozone at 104 degrees F and 20 percent strain 5 Maximum Brittleness Temperature: ASTM D746, minus 35 degrees F 6 Resistance to Heat Aging: ASTM D573 minimum properties ASTM D412, after aging at 240 degrees F for 672 hours as follows: a. Tensile Strength. 1000 pounds per square inch b. Elongation. 150 percent c. Tear Resistance: 125 pounds per inch MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 7 Foam Backing for Flexible Flashings: Closed -cell foam rubber polyethylene, neoprene, or similar soft, compatible material 2.2 ACCESSORY MATERIALS A. Fasteners: Corrosion- resistant metal of same material or as recommended by manufacturer of $petal being fastened. Exposed fastener heads, where permitted, to match color and finish of sheet material. B. Installation Accessories, Flexible Flashings: Provide joint tape, adhesives, sealers, and fasteners as recommended by flexible flashing manufacturer for indicated applications. C. Sealant 1 As specified in Division 7 2. Use noncuring type for concealed joints. 3 Use nonsag elastomeric type for exposed joints. D Joint Adhesive: Two component noncorrosive epoxy adhesive, recommended by metal manufacturer for sealing of nonmoving joints. E. Bituminous Coating: Heavy bodied, sulfur -free, asphalt-based paint; FS TT -C-494 2.3 FABRICATION SECTION 07600 PAGE 3 FLASHING AND SHEET METAL A. Form sheet metal work true to line and profiles indicated, substantially free from oil- canning, buckling, tool marks, and other defects. B Comply with applicable portions of SMACNA "Architectural Sheet Metal Manual." C Provide for thermal expansion of exposed sheet metal work exceeding 15 feet running length. D Provide movement joints at maximum spacing of 10 feet; no joints allowed within 2 feet of corner or intersection. E. Conceal fasteners and expansion provisions wherever possible. Exposed fasteners are not allowed on faces of sheet metal exposed to public view F Form a 1/2 -inch hem on underside of exposed edges. G. Fabricate cleats and attachment devices from same material as sheet metal component being anchored or from compatible, noncorrosive metal recommended by sheet metal manufacturer H. Gage as recommended by SMACNA or metal manufacturer for application, but in no case less than gage of metal being secured. PART 3 EXECUTION 3.1 EXAMINATION A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work will be construed as acceptance of conditions. B. Verify that nailers, blocking, and other attachment provisions for sheet metal work are properly located and securely fastened to resist effects of wind and thermal stresses. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.3 INSTALLATION SECTION 07600 PAGE 4 FLASHING AND SHEET METAL 3.2 PREPARATION A. Prepare substrates and connecting work to enable the best and most complete installation per industry standards of the work 6f this section. B. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal. C. Isolate dissimilar metals by means of a heavy bituminous coating, approved paint coating, adhered polyethylene sheet, or other means approved by the Architect. A. General. Except as otherwise indicated, comply with manufacturer's installation instructions and reconunendations, and with SMACNA "Architectural Sheet Metal Manual." Anchor units of work securely in place by methods indicated, providing for thermal expansion in metal units. Set units true to line and level indicated. Install work with laps, joints and seams permanently weatherproof and watertight. B. Sealed Joints 1 Form minimum 1 -inch hooked joints and embed flange into sealant or adhesive. Form metal to completely conceal sealant or adhesive. 2. Use joint adhesive for nonmoving joints specified not to be soldered. 3 When ambient temperature is moderate (40 to 70 degrees F) at time of installation, set joined members for 50 percent movement either way Adjust setting position of joined members proportionally for temperatures above 70 degrees F Do not install sealant at temperatures below 40 degrees F Refer to Section 07900 Joint Sealers, for handling and installation requirements for joint sealers. C. Roof Edge Flashings: Anchor metal flashings at roof edges to comply with the requirements of Factory Mutual Loss Prevention Data 1-49 for Class 3 wind exposure. D Surface Mounted Reglets: Attach reglets securely to substrate, true to line and level. Install elastomeric sealant at top edge. Refer to Section 07900, Joint Sealers, for handling and installation requirements for joint sealers. E. Counterflashings: Coordinate installation of counterflashings with installation of assemblies to be protected by counterflashing. Install counterflashings in reglet or receiver of other sheet metal fabrication. Secure in a waterproof manner by means of snap -in installation and sealant, lead wedges and sealant, interlocking folded seam, or blind rivets and sealant. Lap counterflashing joints a minimum of 2 inches and bed with sealant. F Flexible Flashing Installation 1. Comply with flashing manufacturer's instructions regarding surface preparation, handling, use of adhesives, and use of fasteners. 2. Take care during and after installation to avoid puncture or rupture of flexible flashing. 3 Secure flexible flashing to vertical surfaces using adhesive or combination of adhesive and fasteners. 4 Form continuous watertight seams between pieces of material using seam adhesive as recommended by flashing manufacturer 5 Do not stretch flashing sheets between points of anchorage. At moving joints or where drawings indicate loop or bellows in flashing, form to approximate profile indicated and adhere foam rubber filler to back of flexible flashing. Anchor and seal edges. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 07600 PAGE 5 FLASHING AND SHEET METAL G. Gutter and Downspout 1 Install gutter, downspouts, and accessories in accordance with manufacturer's instructions. 2. Attach gutter cleats at 24' o.c. maximum. Flash and seal gutters to downspout and accessories. Install expansion joints and covers at 50' o.c. maximum. Provide exposed splice plates and expansion joint covers. Sections of less than 50' shall be continuous without joints. 3 Apply bituminous protective backing on surfaces in contact with dissimilar materials. 4 Seal metal joints watertight. H. Underlayment: Where aluminum is to be installed directly on cementitious or wood substrates, install a slip sheet of red rosin paper and a course of polyethylene underlayment. I. Bed flanges of work in a thick coat of bituminous roofing cement where required for waterproof performance. J Install reglets to receive counterflashing in manner and by methods indicated. K. Install counterflashing in reglets, either by snap -in seal arrangement or by welding in place for anchorage and filling reglet with mastic or elastomeric sealant, as indicated and depending on degree of sealant exposure. L. Install elastic flashing in accordance with manufacturer's recommendations. Where required, provide for movement at joints by forming loops or bellows in width of flashing. Locate cover or filler strips at joints to facilitate complete drainage of water from flashing. Seam adjacent flashing sheets with adhesive, seal and anchor edges in accordance with manufacturer's recommendations. M. Nail flanges of expansion joint units to curb nailers, at maximum spacing of 6 inches o.c. Fabricate seams at joints between units with minimum 3 -inch overlap, to form a continuous, waterproof system. 3.4 FIELD QUALITY CONTROL A. Provide experienced supervision of all elements of the work of this section. 3.5 CLEANING AND PROTECTION A. Repair or replace work which is damaged or defaced, as directed by the Architect. B Clean exposed metal surfaces, removing substances which would interfere with uniform oxidation and weathering. C. Provide final protection in a manner which is acceptable to the installer and which ensures that sheet metal work will be without damage or deterioration at time of substantial completion. 3.6 SCHEDULE A. Provide flashing and sheet metal work as indicated on project drawings. B All parapet copings to be aluminum. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 07600 MAHLUM NORDFORS McIaNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 07716 PAGE 1 ROOF SPECIALTIES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Fascia panel systems. 2. Fascia and gravel stop. 3 Elastic bellows -type roof expansion joint cover B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 7 Section "Flashing and Sheet Metal" for the following Work: a. Metal flashing and counter flashing. b. Scuppers, gutters, and downspouts. c. Miscellaneous sheet metal accessories. d. Elastic, laminated, and composition flashing. e. Copings 2. Roofing accessories installed integral with roofing membrane are specified in roofing system Sections as roofing work. 3 Sheet metal and flashings not part of fascia and coping systems included in this Section are specified in another Division 7 Section. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data including manufacturer's technical data, installation instructions and general recommendations for each product specified. Include data substantiating that materials and performance comply with requirements. C. Shop drawings indicating layout, joining, profiles, accessories, anchorages, flashing connections, and relationship to supporting structure and to adjoining roof and wall construction. D Samples for initial selection purposes in form of manufacturer's sample finishes showing full range of colors and textures available for those units with factory- applied color finishes. E. Samples for verification purposes of each type of exposed finish required, prepared on samples of size indicated below and of same thickness and material indicated for final unit of Work. Where finishes involve normal color and texture variations, include sample sets showing full range of variations expected. Provide samples of not less than the following sizes: 1 Fascia. 8- inch -long sections of each distinctly different fascia component, including extenders (if any), exposed as finish work. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.4 QUALITY ASSURANCE A. Industry Standards: Provide products which comply with applicable requirements of SMACNA "Architectural Sheet Metal Manual," except as otherwise indicated. 1.5 JOB CONDITIONS A. Coordinate work of this Section with adjoining work for proper sequencing of each installation to ensure best possible weather resistance and protection of materials and finishes against damage. PART 2- PRODUCTS 2.1 MATERIALS A. Aluminum Sheet: Alloy and temper recommended by manufacturer for use intended and as required for proper application of finish indicated but with not less than the strength and durability properties specified in ASTM B 209 for 5005 -H15 2.2 MISCELLANEOUS ITEMS SECTION 07716 PAGE 2 ROOF SPECIALTIES A. Exposed Fasteners: Stainless steel, non magnetic, of type and size standard with manufacturer for product and application indicated. Match finish of exposed heads with material being fastened. B. Concealed Fasteners: Same metal as item fastened or other noncorrosive metal as recommended by manufacturer C. Mastic Sealant: Polyisobutylene; non hardening, nonskinning, nondrying, nonmigrating sealant. D Foam Rubber Seal. Manufacturer's standard foam. E. Adhesives: Type recommended by manufacturer for substrate and project conditions, and formulated to withstand minimum 60 psf uplift force. 2.3 FASCIA SYSTEMS A. Formed Aluminum Panels: Manufacturer's standard modular panels formed from aluminum sheet not less than shapes and sizes indicated. Include trim, closure strips, and other accessories indicated or required for proper installation. Provide aluminum sheet of the following minimum thickness, unless otherwise indicated. 1 Thickness: 0 050 inch. 2. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products which may be incorporated in the work include, but are not limited to, the following: a. Atlas Aluminum Corp. b. Cheney Flashing Co. c. W P Hickman Co. d. Merchant and Evans, Inc. e. MM Systems Corp. f. Petersen Aluminum Corp. MAHLUM NORDFORS McKQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07716 PAGE 3 ROOF SPECIALTIES B. Fascia and Gravel Stop: Manufacturer's standard system consisting of fascia formed from minimum 0 050- inch -thick aluminum sheet designed to interlock with water dam, minimum 26 gage (nominal 0 0217 inch thick), formed, zinc coated steel water dam/hold -down clip, compression clamp with concealed screw attachment to water dam, and compression pad designed to maintain fascia engagement with water dam clip and compression clamp; of profile and size indicated; with prefabricated outside and inside corner, miters welded before finishing. 1 Available Products: Subject to compliance with requirements, products which may be incorporated in the work include, but are not limited to, the following: a. Type TE Gravel Stop and Fascia; Architectural Products Co. b. Spring -Loc Fascia/Gravel Stop; Atas Aluminum Corp. c. Splice-Lock Roof Edging System; Cheney Flashing Co. d. Presto Lock Fascia and Flashing System; Manville Corp. e. Snap -Lok Fascia System; MM Systems Corp. 2. Wind Pressure: Wind Zone 2, 31 psf (1 48kPa) through 45 psf (2.15kPa). 2.5 ELASTIC, BELLOWS TYPE EXPANSION JOINT COVERS A. General. Provide units fabricated specifically for required applications (roof to roof, roof to wall, curb mounted). Provide prefabricated corner units, joint intersection units, splicing units, adhesives, coatings, and other components as recommended by joint unit manufacturer for a complete installation. B. Metal Flanged Elastic -Sheet Joint System. Provide units consisting of exposed elastic sheet over foam bellows, securely anchored at both edges to 3- to 4- inch -wide sheet metal nailing flanges, either plain or angle- formed to fit curbs as required. Bellows insulated from below with adhesively applied, closed -cell, flexible, rubber or plastic insulation not less than 5/16 inch thick, adhered to elastic sheet. 1 Elastic Sheet: EPDM, 60 mils. 2. Elastic Sheet Width. 5 to 6 inches between flanges. 3 Metal Flanges: Aluminum, minimum 0 032 -inch thickness. 4 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include but are not limited to the following: a. Expansion Joint Shields; Celotex Corp. b. Metalastic; International Permalite, Inc. c. Expand -O -Flash; Manville Sales Corp. d. Rufseal; MM Systems Corp. e. Pate Expansion Joint Cover The Pate Co. f. Superflash, York Manufacturing, Inc. 2.6 FABRICATION A. General. Provide items designed and fabricated to fit applications indicated and to perform optimally with respect to weather resistance, water tightness, durability strength, and uniform appearance. B Expansion Provisions: Fabricate running lengths to allow controlled expansion not only for movement of metal components in relationship to one another but also to adjoining dissimilar MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDTTIONS ALTERATIONS SECTION 07716 PAGE 4 ROOF SPECIALTIES materials, including flashing and roofing membrane materials, in a manner sufficient to prevent water leakage, deformation or damage. 2.7 ALUMINUM FINISHES A. General. Comply with AMP 501 "Finishes for Aluminum" and AMP 505 "Applied Coatings" for finish designations and application recommendations, except as otherwise indicated. For components which are assembled or welded in factory apply finish after fabrication is completed. 1. Provide colors or color matches as indicated or, if not indicated, as selected by Architect from manufacturer's standard colors. B. High Performance Coating: AA- C12C42R1x (cleaned with inhibitive chemicals, conversion coated with an acid chromate- fluoride- phosphate treatment and painted with organic coating specified below). Apply in strict compliance with coating and resin manufacturer's instructions using a licensed applicator 1 Fluorocarbon Coating: Inhibitive thermo -cured primer, minimum 0.2 -mil dry film thickness, and thermo -cured fluorocarbon coating containing "Kynar 500" resin, minimum 1 0-mil dry film thickness. PART 3 EXECUTION 3.1 INSTALLATION A. General. Comply with manufacturer's written installation instructions and recommendations. Coordinate with installation of roof deck and other substrates to receive work of this Section, with vapor retarders, roof insulation, roofing membrane, flashing, and wall construction; as required to ensure that each element of the work performs properly and that combined elements are waterproof and weathertight. Anchor products included in this Section securely to structural substrates, adequate to withstand lateral and thermal stresses as well as inward and outward loading pressures. B. Isolation. Where metal surfaces of units are installed in contact with dissimilar metal or corrosive substrates, including wood, apply bituminous coating on concealed metal surfaces, or provide other permanent separation as recommended by aluminum producer 3.2 CLEANING AND PROTECTION A. Clean exposed metal surfaces in accordance with manufacturer's instructions. Touch -up damaged metal coatings. B. Protection: Provide protective measures as required to ensure that work of this Section will be without damage or deterioration at time of substantial completion. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 07716 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Provide materials, labor, equipment, inspection, coordination, and supervision necessary for the best and most complete installation per industry standards of roofing accessories and specialties with all components and appurtenances as indicated in this specification and the project drawings. B. Section includes: 1 Prefabricated curbs C Related work specified elsewhere includes: 1 Insulation. Division 7 Section `Building Insulation' 2. Sheet metal flashing, including coping: Division 7 Section `Flashing and Sheet Metal' 3 Joint sealants: Division 7 Section, `Joint Sealers' 4 Ventilating equipment and plumbing venting: Division 15 Mechanical 1.3 SUBMITTALS A. General. Comply with Section 01300 Submittals. SECTION 07720 PAGE 1 ROOF ACCESSORIES B Product Data. Manufacturer's specifications, standard details, and installation recommendations for components provided. C. Shop Drawings: Show style and size, fastening, and flashing for each curb required. 1.4 QUALITY ASSURANCE A. Standards: Comply with SMACNA Architectural Sheet Metal Manual' details for fabrication of units, including flanges and cap- flashing to coordinate with type of roofing indicated. Comply with "NRCA Roofing and Waterproofing Manual" details for installation of units. PART 2 PRODUCTS 2.1 MATERIALS A. Aluminum Sheet: ASTM B209• manufacturer's standard alloy and temper to suit specified finishes B. Steel Sheet: ASTM A570 C. Galvanized Steel Sheet: ASTM A526 or A527 minimum G90 coating D Hot -Dip Galvanizing (fabricated products and hardware): ASTM Al23 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS E. Fasteners F Steel for Structural Supports and Reinforcements: ASTM A36, hot -dip galvanized after fabrication in accordance with ASTM Al23 G. Isolation Coatings 1 Zinc Chromate Alkyd Primer FS TT-P-645 2. Bituminous Coating: FS TT-C-494 Type II 2.2 FINISHES 2.3 PREFABRICATED CURB A. Acceptable Manufacturers 1. Curbs, Inc. 2. Custom Curb, Inc. 3 Roof Products and Systems Corporation 4 Pate Company PART 3- EXECUTION 3.1 EXAMINATION SECTION 07720 PAGE 2 ROOF ACCESSORIES 1 For Attachment of Roof Accessories to Supporting Structure: Hot -dip galvanized zinc plated or cadmium plated steel, or stainless steel. 2. For Aluminum. Made from the following, according to roof accessory manufacturer's standard practice: a Stainless steel. ASTM A193 B8 series b. Aluminum: ASTM B211, alloy 2024 -T4 for threaded fasteners; ASTM B316 for rivets 3 For Steel and Galvanized Steel. Hot -dip galvanized steel. 4 For Dissimilar Metals: Stainless steel, ASTM A193 B8 series. A. Class I Natural Anodized Finish. AA- M12C22A41 (nonspecular as- fabricated mechanical finish; chemical etch, medium matte; 0 7 mil minimum thickness clear anodic coating). B Mill Finish. As fabricated, with welds cleaned and dressed and exposed welds ground smooth. Remove oil, grease, dirt, and weld spatter from finished units. B. Quality Standard Product: Prefabricated roof curbs as manufactured by Custom Curb, Inc. C. Description 1 Box Section design, 18 -gage galvanized steel with continuous welded seams. 2. Factory installed treated wood nailer 3 Insulation. 1 -1/2 inches, three -part fiberglass board. 4 Style: Type CRC 3 A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work will be construed as acceptance of conditions. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 07720 PAGE 3 ROOF ACCESSORIES B. Verify that substrates and openings to receive roof accessories are rigidly set, at proper lines and elevation, properly sized, and ready to receive accessories. C. Coordinate roof accessory installation with roofing work and other adjacent elements of building envelope to ensure watertight construction. 3.2 tREPARATION A. Prepare substrates and connecting work to enable the best and most complete installation per industry standards of the work of this section. B. Coat contact surfaces of dissimilar metals with one or more coats of isolation coating. The following metals are not considered dissimilar aluminum, stainless steel, cadmium, and zinc. C. Apply one 15 -mil dry film thickness coat of bituminous isolation coating to metal surfaces other than galvanized steel which will be in contact with cementitious materials. 3.3 INSTALLATION A. Install roof accessories in accordance with manufacturer's instructions and shop drawings. B. Set units plumb and true, and in proper alignment and relation to established lines and levels. Set flashings free of warp or twist. C. Pack shim spaces with batt insulation. 3.4 FIELD QUALITY CONTROL A. Comply with Section 01400 Quality Control. B Provide experienced supervision of all elements of the work of this section. 3.5 CLEANING AND PROTECTION A. Comply with Section 01500 Construction Facilities and Temporary Controls, and Section 01710, Final Cleaning. B Remove protective material from prefinished surfaces immediately after installation. C. Touch up marred or abraded areas of finished elements. If satisfactory touch -up cannot be accomplished, remove and replace element. 01997 Mahlum Nordfors McKinley Gordon 1 END OF SECTION 07720 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 07820 PAGE 1 ALUMINUM FRAMED SKYLIGHTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division -1 Specification sections, apply to work of this section. 1.2 SUMMARY A. Dome style skylight. Extent and location of work is indicated on drawings. B System Description. Provide a complete exterior enclosure system, complying with the performance requirements specified. Include the following: 1 Aluminum framing system, including thermally broken, insulated integral curb. 2. Double Acrylic glazed dome 3 Glazing gaskets and accessories 4 Extruded and sheet accessory pieces, including border and filler pieces 5 Flashings 6 Anchors, fasteners, shims, and inserts as required to attach to structure. C. Related work specified elsewhere includes: 1 Division -7 Section `Flashing and Sheet Metal' 2. Division -7 Section Joint Sealants' 3 Division -7 Section `Single -Ply Membrane Roofing' 1.3 PERFORMANCE REQUIREMENTS A. General Design Requirements: Design to accommodate glass specified. B Structural Performance 1 Design system to withstand all live and dead loads with the following maximum deflections: a. In Plane of Wall. Not greater than that which would reduce glazing edge clearance to less than 25 percent of design dimension, or 1/8 inch, whichever is greater or that which would reduce glazing bit to less than 75- percent design dimension. 2. Design system to withstand 150 percent of design wind load with no failure or permanent deformation greater than 0.2 percent of span. C. Wind Loads: Design the system to comply with the following: 1 Applicable requirements of the currently adopted edition of the Uniform Building Code. 2. Conform to design wind loads, wind pressures and exposure as described on Structural Drawings and in Specifications. D Deflection of Structure: Allow for deflection of structural members to which system is anchored. E. Thermal Movement MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1 Allow for expansion and contraction resulting from ambient temperature range of 120 degrees F 2. Base design calculations .on actual surface temperatures of materials due to both solar heat gain and nighttime sky heat loss. F Air Infiltration. Not more than 0 06 cfm per square foot of fixed area measured at 6.24 psf. G. Water Penetration. Design system to drain water and condense to exterior design for no uncontrolled water penetration on interior face at pressure differential as verified by the Architect. H. Condensation Resistance: Not less than 25 and above. I. Maximum Thermal Transmittance (U- Value) 1.25 J Solar Heat Gain Coefficient (SHGC)• 0 45 1.4 SUBMITTALS A. Product Data: Manufacturer's specifications for materials and fabrication, installation instructions and recommendations, and maintenance and reglazing instructions. B. Shop Drawings 1. Show elevations, dimensions, member profiles, details of composite members, details of flashing and sill closures, details of interface with other building construction, reinforcement, expansion provisions, method and location of attachment to structural system, and glazing materials and methods. 2. Prepare drawings at 1/2 inch to 1 foot for elevations and 3 inches to 1 foot for details. 3 Section module of wind- load bearing members. 4 Calculations showing design of structural anchors. 5 Calculations of structural reactions at points of attachment to the structural system. 6 Field measurements. 1.5 QUALITY ASSURANCE 1.6 PROJECT CONDITIONS NOTE. Shop drawings shall have the seal of the design engineer and a written statement by that engineer that the system conforms to the structural performance requirements specified. SECTION 07820 PAGE 2 ALUMINUM FRAMED SKYLIGHTS A. Engineering Design. Structural engineering shall be performed by a professional engineer licensed in Washington State and employed by the system manufacturer B. Single Source Responsibility In order to produce a contiguous, homogeneous appearance, it is the design intent to have the systems produced by a single manufacturer, including all required attachment devices, accessories, and miscellaneous components. A. Verify conditions at site affecting work to ensure the best and most complete installation per industry standards. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.2 GLAZED ALUMINUM SKYLIGHTS C. Finish. High grade, two step, Class 1 clear anodized. D Fasteners SECTION 07820 PAGE 3 ALUMINUM FRAMED SKYLIGHTS B. Take field measurements as required to ensure proper fitting of the work. C. Provide protection and cleaning instructions and procedures to installers of related work. 1.7 WARRANTY A. Provide written warranty agreeing to repair or replace work which fails in materials or workmanship within 5 years from date of substantial completion. 1 Failure includes failure to perform as specified, failure of insulating glass seals, formation of internal condensation in insulating units, glass breakage in excess of expected accidental breakage, and deterioration of finish or construction in excess of that to be expected under normal weathering. 2. Warranty to be signed by manufacturer, installer, and Contractor 3 This warranty is in addition to, and not a limitation of all other rights the Owner may have against the Contractor under the contract documents. PART 2- PRODUCTS 2.1 GENERAL A. Available Products: Subject to compliance with requirements, Aluminum Framed Skylights that may be incorporated in the work include, but are not limited to the following: 1 American Skylights Model TSF 2. Bristolite Model ALT -SF 3 Naturalite/EPI, Inc. TLA 4 Others as approved by addenda A. Includes glazed aluminum vertical and sloped elements of the skylight, the total gutter drainage system, all associated sealant, flashing, trim, fasteners, supports, etc. as shown. These total systems shall be designed, manufactured, and installed by a single subcontractor /supplier 1 Products which have minor differences will be accepted when, in the judgment of the Architect, such differences do not detract from design concept or intended performance. 2. Framing members of extruded aluminum with thermal break. 3 Fully unitized, factory- assembled, and factory- glazed. 2.3 MATERIALS A. Glazing: White polycarbonate double dome. B. Aluminum Members: Alloy and temper recommended by manufacturer for the strength required, for corrosion resistance, and for application of required finish, ASTM B221 for extrusions, ASTM B209 for sheet/plate. 1 Aluminum, nonmagnetic stainless steel, or other materials warranted by manufacturer to be noncorrosive, noncorrodible, and compatible with aluminum components. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 07820 PAGE 4 ALUMINUM FRAMED SKYLIGHTS 2. Provide reinforcement where fasteners are screwed into aluminum members of less than 1/8 inch thickness. 3 Do not use exposed fasteners. E. Slip -Joint Accessories: Pads, sheets, shims, or washers which allow free movement and prevent corrosion "freeze -up." F Concealed Flashing: Dead -soft stainless steel, 26 gauge minimum; extruded aluminum, 0062 inch minimum; or an alloy and type selected by manufacturer for compatibility with other components. G. Exposed Flashing and Sill Closure: Aluminum sheet 0 0508 -inch minimum thickness break formed into shapes and profiles shown on drawings. H. Miscellaneous Concealed Metal Members: Aluminum or nonmagnetic stainless steel; members which are not exposed to weather or abrasion may be hot -dip galvanized steel complying with ASTM Al23 galvanized members located in internal drainage channels shall be completely coated with dissimilar metal coating. I. Dissimilar Metal Coating: Cold applied asphalt mastic, zinc chromate paint, or other nonconductive, nonabsorptive material. J Joint Sealers 1 Use only nonhardening, nonshrinking, and nonmigrating materials. Refer to Division -7 Section `Joint Sealants. 2. For nonworking metal -to -metal joints within framing members, use small joint sealant, AAMA 803.3 2.4 FABRICATION A. General 1 Any dimensions which may vary are indicated on drawings, with maximum and minimum dimensions required to achieve design requirements and coordination with other work. 2. Verify all opening dimensions in the field prior to fabrication. B. Unitized Systems: Complete fabrication and assembly before shipping to project site; arrange units in sizes suitable for shipping which fit together without further cutting. Verify field dimensions as required for proper fit. C. Fabrication 1 Perform all finishing prior to shipping to project site. 2. When it is necessary to proceed with fabrication without actual field measurements, provide adequate fabrication and installation tolerances for proper fit. 3 Maintain accurate relation of planes and angles, with hairline fit of contacting members. 4 Perform fabrication operations, including cutting, fitting, forming, drilling, and grinding of metal work, in manner which prevents damage to exposed finish surfaces. D Welding: Use procedures that prevent discoloration; grind exposed welds smooth and restore mechanical finish. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07820 PAGE 5 ALUMINUM FRAMED SKYLIGHTS E. Reinforcing: Install reinforcing as required to comply with performance requirements and for rigidity separate dissimilar metals as specified in `Installation. PART 3- EXECUTION 3.1 EXAMINATION A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work will be construed as acceptance of conditions. 3.2 PREPARATION A. Prepare substrates and connecting work to enable the best and most complete installation per industry standards of the work of this section. 3.3 INSTALLATION A. Use only workmen experienced in installation of this type of work. B. Comply with manufacturer's instructions and recommendations for installation of components. 1 Take care to protect finishes. 2. Replace damaged members. 3 Install work in accordance with approved shop drawings. C. Set framing plumb, level, and accurately located and aligned within the following tolerances under both no -load and full -load conditions: 1 Variation From Plane or Location. Do not exceed 1/8 inch in 12 feet or 1/2 inch in any length. 2. Variation in Alignment of Two Identical Members Abutting End -to -End. Do not exceed 1/16 -inch offset. D Provide proper support and anchor securely into place; where anchors are intended to allow movement, adjust for proper operation. E. Separate aluminum exposed to weather from dissimilar metals; coat dissimilar metals that are in drainage cavities, using one of the materials specified. Aluminum, stainless steel, zinc, cadmium, and small areas of white bronze are not considered dissimilar from each other F Coat all metals that come into contact with masonry concrete, and treated wood, using one of the materials specified. G. Clean and touch up welds, bolted connections, and abraded areas in accordance with ASTM A780 using galvanizing repair paint. 3.4 FIELD QUALITY CONTROL A. Provide experienced supervision of all elements of the work of this section. 3.5 CLEANING AND PROTECTION A. Clean completed systems inside and out promptly after erection and after installation of glass and sealants, taking care to avoid damage to finishes. Remove excess sealants, dirt, and other substances from framing and panel surfaces. MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS B. Clean glazed surfaces as specified by manufacturer C. Protect and maintain protection of completed work in a manner acceptable to fabricator and installer in order to ensure that work is undamaged at time of substantial completion. 0 1997 Mahlun Nordfors McKinley Gordon SECTION 07820 PAGE 6 ALUMINUM FRAMED SKYLIGHTS END OF SECTION 07820 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 07901 PAGE 1 JOINT SEALANTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes joint sealants for the following locations: 1. Exterior joints in vertical surfaces and nontraffic horizontal surfaces as indicated below a Control and expansion joints in cast -in -place concrete. b. Control and expansion joints in Pre-cast wall panels. c. Control and expansion joints in EIFS. d. Control and expansion joints in unit masonry e. Joints between different materials listed above. f. Perimeter joints between materials listed above and frames of doors and windows. g. Control and expansion joints in soffit and overhead surfaces. h. Other joints as indicated. 2. Exterior joints in horizontal traffic surfaces as indicated below a. Control, expansion, and isolation joints in cast -in -place concrete slabs. b. Tile control and expansion joints. c. Joints between different materials listed above. d. Other joints as indicated. 3 Interior joints in vertical surfaces and horizontal nontraffic surfaces as indicated below a. Control and expansion joints on exposed interior surfaces of exterior walls. b. Perimeter joints of exterior openings where indicated. c. Joints between tops of non -load- bearing unit masonry walls and underside of structure. d. Tile control and expansion joints. f. Perimeter joints between interior wall surfaces and frames of interior doors, windows, and elevator entrances. g. Perimeter joints of toilet fixtures. h. Other joints as indicated. 4 Interior joints in horizontal traffic surfaces as indicated below a. Control and expansion joints in cast -in -place concrete slabs. b. Control and expansion joints in tile flooring. c. Other joints as indicated. B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 7 Section `Exterior Insulation and Finish Systems' for sealing joints related to exterior finish system. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Division 9 Section "Flashing and Sheet Metal" for sealing joints related to flashing and sheet metal for roofing. 3 Division 8 "Glass and Glazing" for sealants used in glazing. 4 Division 9 Section "Firestopping" for through- penetration firestopping systems. 5 Division 9 Section "Gypsum Board Assemblies" for sealing concealed perimeter joints of gypsum board partitions to reduce sound transmission. 6 Division 9 Section "Acoustical Panels" for sealing edge moldings at perimeter of acoustical ceilings. 7 Division 9 Section "Tile" for sealing tile joints. 1.3 SYSTEM PERFORMANCE REQUIREMENTS A. Provide elastomeric joint sealants that have been produced and installed to establish and to maintain watertight and airtight continuous seals without causing staining or deterioration of joint substrates. 1.4 SUBMITTALS SECTION 07901 PAGE 2 JOINT SEALANTS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections: 1 Product data from manufacturers for each joint sealant product required. 2. Samples for initial selection purposes in form of manufacturer's standard bead samples, consisting of strips of actual products showing full range of colors available, for each product exposed to view Where custom colors are specified, submit actual products in specified colors. 3 Certificates from manufacturers of joint sealants attesting that their products comply with specification requirements and are suitable for the use indicated. 4 Compatibility and adhesion test reports from elastomeric sealant manufacturer indicating that materials forming joint substrates and joint sealant backings have been tested for compatibility and adhesion with joint sealants. Include sealant manufacturer's interpretation of test results relative to sealant performance and recommendations for primers and substrate preparation needed to obtain adhesion. 5 Product test reports for each type of joint sealants indicated, evidencing compliance with requirements specified. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed joint sealant applications similar in material, design, and extent to that indicated for Project that have resulted in construction with a record of successful in- service performance. B. Preconstruction Field Testing: Prior to installation of joint sealants, field -test their adhesion to joint substrates as follows: 1. Locate test joints where indicated or, if not indicated, as directed by Architect. 2. Conduct field tests for each application indicated below a. Vertical and horizontal joints in EIFS. b. Vertical and horizontal joints in Pre -cast wall panels. c. Joints between unit masonry and other material. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.6 DELIVERY, STORAGE, AND HANDLING SECTION 07901 PAGE 3 JOINT SEALANTS d. Joints between materials listed above and frames of doors and windows. e. Other joints as indicated. 5 Test Method: Test joint sealants by hand pull method described below a. Install joint sealants in 5 -feet joint lengths using same materials and methods for joint preparation and joint sealant installation required for completed Work. Allow sealants to cure fully before testing. b. Make knife cuts horizontally from one side of joint to the other followed by 2 vertical cuts approximately 2 inches long at side of joint and meeting horizontal cut at top of 2 -inch cuts. Place a mark 1 inch from top of 2 -inch piece. c. Use fingers to grasp 2 -inch piece of sealant just above 1 -inch mark; pull firmly down at a 90- degree angle or more while holding a ruler along side of sealant. Pull sealant out of joint to the distance recommended by sealant manufacturer for testing adhesive capability but not less than that equaling specified maximum movement capability in extension; hold this position for 10 seconds. 6 Report whether or not sealant in joint connected to pulled -out portion failed to adhere to joint substrates or tore cohesively Include data on pull distance used to test each type of product and joint substrate. 7 Evaluation of Field Test Results: Sealants not evidencing adhesive failure from testing, in absence of other indications of noncompliance with requirements, will be considered satisfactory Do not use sealants that fail to adhere to joint substrates during testing. F Pre Installation Conference: Conduct conference at Project site to comply with requirements of the Division 1 Section covering this activity A. ,Deliver materials to Project site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration period for use, pot life, curing time, and mixing instructions for multicomponent materials. B. Store and handle materials in compliance with manufacturer's recommendations to prevent their deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes. 1.7 PROJECT CONDITIONS A. Environmental Conditions: Do not proceed with installation of joint sealants under the following conditions: 1 When ambient and substrate temperature conditions are outside the limits permitted by joint sealant manufacturer or below 40 degrees F (4 4 degrees C). 2. When joint substrates are wet. B. Joint Width Conditions: Do not proceed with installation of joint sealants where joint widths are less than allowed by joint sealant manufacturer for application indicated. C. Joint Substrate Conditions: Do not proceed with installation of joint sealants until contaminants capable of interfering with their adhesion are removed from joint substrates. 1.8 SEQUENCING AND SCHEDULING A. Sequence installation of joint sealants to occur not less than 21 nor more than 30 days after completion of waterproofing, unless otherwise indicated. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 2- PRODIJCTS 2.1 GENERAL A. Compatibility Provide joint sealers, joint fillers, and other related materials that are compatible with one another and with joint substrates under conditions of service and application as demonstrated by sealant manufacturer based on testing and field experience. B. Colors: Provide color of exposed joint sealers as selected by Architect from manufacturer's standard colors, except for the one -part nonsag urethane sealant which shall be supplied in (up to) two custom colors and one standard color 2.2 ELASTOMERIC JOINT SEALANTS A. Elastomeric Sealant Standard: Provide manufacturer's standard chemically curing, elastomeric sealant of base polymer indicated which complies with ASTM C920 requirements, including those referenced for type, grade, class, and uses. B. Concrete and Tile, Interior Floor 1 Acceptable Manufacturers a. Permagile Industries Inc. (800) 645 -7546 b. Others as approved by addenda 2. Quality Standard: "Formula T -250" by Permagile Industries Inc. 3 Sealant Type: Two component, elastic -type epoxy 4 Technical Data SECTION 07901 PAGE 4 JOINT SEALANTS Property Standard Value Tensile strength ASTM D638 350 to 600 psi Tensile elongation ASTM D638 100 percent Hardness (shear A durometer) ASTM D2240 80 10 Adhesion to concrete ASTM C321 200 to 250 psi Water absorption ASTM C413 0.2 percent Color manufacturer's 5 Installation a. Blow clean and dry with compressed air to remove excess moisture and dirt. b. Allow concrete to cure a minimum of 7 days. c. Tape both sides of joint with masking tape. d. Provide bond breaking tape at bottom of joints. C. Ceramic Tile, Interior Walls, Casework Joints, Backsplash and Endsplash Perimeters, Plumbing Fixture Perimeters 1 Acceptable Manufacturers a. General Electric Silicone b. Others as approved by addenda gray MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Quality Standard Products: "GE Sanitary 1700 Silicone Sealant" by General Electric Silicone, color as selected from manufacturer's standard colors 3 Sealant Type: Acetoxy curing, sanitary silicone 4 Standards: FS TT- S -001543A, type II, class A S. General. Joint shall be tooled- concave D Exterior Walks 1 Quality Standard Product a. "Hotpour Spec," J&P Petroleum Products, Inc. b. "Hi- Spec," W.R. Meadows, Inc. c. Others as approved by addenda 2. Standards: Manufacturer's standard sealant for concrete and asphalt pavement joints complying with ASTM D3405 E. All Exterior Flashing, Unit Masonry Pre-cast, Etc. 1. Quality Standard Product a. "Chem -Caulk 2639 Bostik Construction Products Division b. "Vulkem 116," Mameco International, Inc. c. "Vulkem 921," Mameco International, Inc. d. "Dynatrol I," Pecora Corporation e. "Sonolastic NP 1," Sonnebom Building Products Division, Rexnord Chemical Products, Inc. f. "Dymonic," Tremco Inc. g. Others as approved by addenda SECTION 07901 PAGE 5 JOINT SEALANTS 2. Standards: Sealant shall be one -part nonsag urethane, type S, grade NS, class 25 rated for uses NT M, A, 0, hardness 20-41, per ASTM C920 mixed in two custom colors. 2.3 MISCELLANEOUS JOINT SEALANTS A. Acoustical Sealant for Concealed Joints 1. General. Manufacturer's standard, nondrying, nonhardening, nonskinning, nonstaining, gunnable, synthetic rubber sealant recommended for sealing interior concealed joints to reduce transmission of airborne sound. 2. Acceptable Manufacturers a. Protective Treatments, Inc. b. Henry c. Tremco d. Pecora e. Miricle f. Others as approved by addenda 3 Quality Standard. "PTI 808 Acoustical Sealant," Protective Treatments, Inc. 4 Sealant Type: Nonhardening butyl sealant MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 5 Standards: ASTM C919 (butyl) 6 General. Joints shall be tooled to prevent voids. SECTION 07901 PAGE 6 JOINT SEALANTS B. Interior Door Jambs and Heads 1 Quality Standard Product a. "Chem -Caulk 600," Bostik Construction Products Division b. "AC -20," Pecora Corporation c. "Sonolac," Sonnebom Building Products Division, Rexnord Chemical Products, Inc. d. "Tremco Acrylic Latex 834 Tremco Inc. e. Others as approved by addenda 2. Standards: Manufacturer's standard, one part, nonsag, mildew resistant, acrylic emulsion sealant complying with ASTM C834 formulated to be paintable. C. Glazing Against Glazing or Metal (where manufacturer's compression gasket not recommended) 1 Quality Standard Product a. "Chem -Caulk 1200 Bostik Construction Products Division b. Dow Corning c. "999A," Dow Corning d. "SCS 1000," General Electric e. "Construction 1200 General Electric f. "SCS 1702 Sanitary General Electric g. Pecora Corporation h. 'Rhodorsil 3B," Rhone- Poulenc i. "Rhodorsil 90 Rhone Poulenc j. "OmniPlus," Sonnebom Building Products Division, Rexnord Chemical Products, Inc. k. "Proglaze," Tremco Inc. 1. Others as approved by addenda 2. Standards: Sealant shall be one -part acid- curing silicone, type S, grade NS, class 25 rated for uses NT G, A, 0, hardness 20 -35 per ASTM C920 D Fire- Resistant Joint Sealer Reference Section 07270, Firestopping and Smokestopping. 2.4 JOINT SEALANT BACKING A. General. Provide sealant backings of material and type which are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing. MAHLUM NORDFORS McIC NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07901 PAGE 7 JOINT SEALANTS B. Plastic Foam Joint Fillers: Preformed, compressible, resilient, nonwaxing, nonextruding strips of flexible, nongassing plastic foam of closed -cell extruded polyethylene foam; nonabsorbent to water and gas; and of size, shape, and density to control sealant depth and otherwise contribute to producing optimum sealant performance. C. Elastomeric Tubing Joint Fillers 1 Acceptable Manufacturers a. Applied Extrusion Technologies, Inc. b. Others as approved by addenda 2. Quality Standard Product: "SOF ROD" closed -cell backed rod by Applied Extrusion Technologies, Inc. 3 General. Neoprene, butyl, EPDM, or silicone tubing complying with ASTM D1056, nonabsorbent to water and gas, capable of remaining resilient at temperatures down to 26 degrees F Provide products with low compression set and of size and shape to provide a secondary seal, to control sealant depth, and otherwise contribute to optimum sealant performance. D Bond Backer Tape: Polyethylene tape or other plastic tape as recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self adhesive tape where applicable. 2.5 MISCELLANEOUS MATERIALS A. Primer Provide type recommended by joint sealer manufacturer where required for adhesion of sealant to joint substrates indicated as determined form preconstruction joint sealer- substrate tests and field tests. B. Cleaners for Nonporous Surfaces: Provide nonstaining, chemical cleaners of type which are acceptable to manufacturers of sealants and sealant backing materials, which are not harmful to substrates and adjacent nonporous materials, and which do not leave oily residues or otherwise have a detrimental effect on sealant adhesion or in- service performance. C. Masking Tape: Provide nonstaining, nonabsorbent type compatible with joint sealants and to surfaces adjacent to joints. D Accessory Materials for Firestopping Sealants: Provide forming, joint fillers, packing, and other accessory materials required for installation of firestopping sealant as applicable to installation conditions indicated. 2.6 JOINT FILLERS FOR CONCRETE PAVING A. General. Provide joint fillers of thickness and widths indicated. B. Bituminous Fiber Joint Filler Preformed strips of asphalt saturated fiberboard complying with ASTM D1751 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 3- XECUTION 3.1 EXAMINATION SECTION 07901 PAGE 8 JOINT SEALANTS A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint sealant performance. Do not proceed with installation of joint sealants until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with recommendations of joint sealant manufacturer and the following requirements: 1 Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint sealants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost. 2. Clean concrete, masonry unglazed surfaces of ceramic tile, and similar porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil -free compressed air 3 Remove laitance and form release agents from concrete. 4 Clean metal, glass, porcelain enamel, glazed surfaces' of ceramic tile, and other nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants. B. Joint Priming: Prime joint substrates where indicated or where recommended by joint sealant manufacturer based on preconstruction joint sealant- substrate tests or prior experience. Apply primer to comply with joint sealant manufacturer's recommendations. Confine primers to areas of joint sealant bond; do not allow spillage or migration onto adjoining surfaces. C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal. 3.3 INSTALLATION OF JOINT SEALANTS A. General. Comply with joint sealant manufacturer's printed installation instructions applicable to products and applications indicated, except where more stringent requirements apply B. Sealant Installation Standard: Comply with recommendations of ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated. C. Acoustical Sealant Application Standard. Comply with recommendations of ASTM C 919 for use of joint sealants in acoustical applications as applicable to materials, applications, and conditions indicated. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07901 PAGE 9 JOINT SEALANTS D Installation of Sealant Backings: Install sealant backings to comply with the following requirements: 1 Install joint fillers of type indicated to provide support of sealants during application and at position required to produce the cross sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability a. Do not leave gaps between ends of joint fillers. b. Do not stretch, twist, puncture, or tear joint fillers. c. Remove absorbent joint fillers that have become wet prior to sealant application and replace with dry material. 2. Install bond breaker tape between sealants where backer rods are not used between sealants and joint fillers or back of joints. E. Installation of Sealants Install sealants by proven techniques that result in sealants directly contacting and fully wetting joint substrates, completely filling recesses provided for each joint configuration, and providing uniform, cross sectional shapes and depths relative to joint widths that allow optimum sealant movement capability Install sealants at the sane time sealant backings are installed. F Tooling of Nonsag Sealants: Immediately after sealant application and prior to time skinning or curing begins, tool sealants to form smooth, uniform beads of configuration indicated, to eliminate air pockets, and to ensure contact and adhesion of sealant with sides of joint. Remove excess sealants from surfaces adjacent to joint. Do not use tooling agents that discolor sealants or adjacent surfaces or are not approved by sealant manufacturer. 1 Provide concave joint configuration per Figure 5A in ASTM C 1193 unless otherwise indicated. a. Use masking tape to protect adjacent surfaces of recessed tooled joints. G. Installation of Preformed Foam Sealants: Install each length of sealant immediately after removing protective wrapping, taking care not to pull or stretch material, and to comply with sealant manufacturer's directions for installation methods, materials, and tools that produce seal continuity at ends, turns, and intersections of joints. For applications at low ambient temperatures where. expansion of sealant requires acceleration to produce seal, apply heat to sealant in conformance with sealant manufacturer's recommendations. 3.4 CLEANING A. Clean off excess sealants or sealant smears adjacent to joints as work progresses by methods and with cleaning materials approved by manufacturers of joint sealants and of products in which joints occur 3.5 PROTECTION A. Protect joint sealants during and after curing period from contact with contaminating substances or from damage resulting from construction operations or other causes so that they are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so that and installations with repaired areas are indistinguishable from original work. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.6 ELASTOMERIC JOINT SEALER DATA SECTION 07901 PAGE 10 JOINT SEALANTS A. Elastomeric Join Sealer Designation. ES -la 1 Base Polymer Urethane 2. Type: Single component, paintable 3 Grade: Nonsag 4 Class: A 5 Additional Movement Capability 100 percent movement in extension and 50 percent movement in compression 6. Uses Related to Exposure: NT (nontraffic) 7 Uses Related to Joint Substrates: M, A, 0 and as applicable to joint substrates indicated in Joint Sealant Schedule (other block concrete) 8. Products a. Sikaflex 15LM b. Vulkem 921 B. Elastomeric Joint Sealer Designation. ES -1B 1 Base Polymer Neutral, curing ultra -low modulus silicone 2. Type: Single component 3 Grade: Nonsag 4 Class: A 5 Additional Movement Capability 100 percent movement in extension and 50 percent movement in compression 6 Uses Related to Exposure: NT nontraffic) 7 Uses Related to Joint Substrates: M, A, 0 and as applicable to joint substrates indicated in Joint Sealant Schedule (other EIFS, block concrete) 8. Products a. Dow 790 b. GE Silpruf c. Pecora 864 d. Tremco Spectrem 1 C. Elastomeric Joint Sealer Designation. ES -1C 1 Base Polymer Neutral, curing low modulus silicone 2. Type: Single component 3 Grade: Nonsag 4 Class: A 5 Additional Movement Capability 50 percent movement in both extension and compression 6. Uses Related to Exposure: NT nontraffic) 7 Uses Related to Joint Substrates: M, A, 0, and as applicable to joint substrates indicated in Joint Sealant Schedule (other block concrete) 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 8. Products a. Dow 795 or 791 b. GE c. Pecora 895 d. Tremco Spectrem 2 SECTION 07901 PAGE 11 JOINT SEALANTS D Elastomeric Joint Sealer Designation. ES-1D 1 Base Polymer Urethane 2. Type: Single component, paintable 3 Grade: Nonsag 4 Class: A 5 Additional Movement Capability 50 percent movement in extension and 50 percent movement in compression 6 Uses Related to Exposure: NT (nontraff c) 7 Uses Related to Joint Substrates: M, A, 0, and as applicable to joint substrates indicated in Joint Sealant Schedule (other• block concrete) 8. Products a. Pecora Dynatrol I b. Sikaflex 1 -A c. Tremco Dymonic d. Vulkem 116 E. Elastomeric Joint Sealer Designation: ES -2A 1 Base Polymer Urethane 2. Type: Single component 3 Grade: Self leveling 4 Class: A 5 Additional Movement Capability 25 percent movement in extension and 25 percent movement in compression 6 Uses Related to Exposure: T (traffic) 7 Uses Related to Joint Substrates: Cast -in -place concrete 8. Products a. Tremco Tremflex SL b. Vulkem 45 F Elastomeric Joint Sealer Designation: ES -2B 1 Base Polymer Urethane 2. Type: Multi- component, paintable 3 Grade: Self leveling 4 Class: A MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07901 PAGE 12 JOINT SEALANTS 5 Additional Movement Capability 25 percent movement in extension and 25 percent movement in compression 6. Uses Related to Exposure: T (traffic) 7 Uses Related to Joint Substrates: Cast -in -place concrete, architectural precast concrete laving units 8. Products a. Tremco THC 900 or THC 901 b. Vulkem 245 G. Elastomeric Joint Sealer Designation. IS -1 1. Base Polymer Acid or neutral curing sanitary silicone 2. Type: Single component 3 Grade: Nonsag 4 Class: A 5 Additional Movement Capability 25 percent movement in both extension and compression 6 Uses Related to Exposure: NT (nontraffic) 7 Uses Related to Joint Substrates: As applicable to joint substrates indicated in Joint Sealant Schedule 8. Products a. GE Sanitary 1700 b. Pecora 898 c. Sealant Specialists, White d. Tremco ProGlaze, White H. Elastomeric Joint Sealer Designation. IS -2A 1 Base Polymer Urethane 2. Type: Single component, paintable 3 Grade: Nonsag 4 Class: A 5 Additional Movement Capability 50 percent movement in extension and 50 percent movement in compression 6 Uses Related to Exposure: NT (nontraffic) 7 Uses Related to Joint Substrates: M, A, 0, and as applicable to joint substrates indicated in Joint Sealant Schedule (other• concrete masonry units, brick, interior stone, concrete, terrazzo) 8. Products a. Sikaflex 1 -A b. Tremco Dymonic c. Vulkem 116 or 921 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 07901 PAGE 13 JOINT SEALANTS Elastomeric Joint Sealer Designation. IS -2B 1. Base Polymer Urethane 2. Type Multi component 3 Grade: Pourable 4 Class: A 5 Additional Movement Capability 25 percent movement in extension and 25 percent movement in compression 6. Uses Related to Exposure: T (traffic) 7 Uses Related to Joint Substrates: Cast -in -place concrete, terrazzo, interior stone 8. Products a. Pecora NR -200 Urexpan b. Tremco THC -900 or THC -901 c. Vulkem 245 Elastomeric Joint Sealer Designation. IS -3 1 Base Polymer Acrylic Latex 2. Type: Single component 3 Grade: Nonsag 4 Class: N/A 5 Additional Movement Capability 15 percent movement in both extension and compression 6 Uses Related to Exposure: NT (nontraffic) 7 Uses Related to Joint Substrates: Joints between GWB, window units, GWB and woodwork 8. Products a. Pecora AC -20 b. Tremco Acoustical Sealant MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDMONS ALTERATIONS Sealant Joint Seater Design. ES -la Single component ultraalow modulus urethane ES -lb Single component low modulus silicone ES -1c Single component low modulus urethane ES -ld Multi -component urethane ES -2a Single component urethane ES -2b Multi- component urethane IS -1 Single- component silicone IS -2a Single- component urethane IS -2b Multi- component urethane IS -3 Single- component acrylic latex IS-4 Construction joints in fire-rated assemblies IS -5 Acoustical sealant 0 1997 Mahlum Nordfors McKinley Gordon Color Locations Where Typically Applied Mfr 's standard to match pre -cast and unit masonry color Custom. To be selected by Architect Custom. To be selected by Architect Standard. To be selected by Architect Standard: To be selected by Architect Standard. To be selected by Architect Standard: White Custom. To be selected by Architect Custom. To be selected by Architect Custom: To be selected by Architect SECTION 07901 PAGE 14 JOINT SEALANTS Unit Masonry control and expansion joints; joints between block and other materials. Joints between EIFS and window and door frames; joints in concealed flashing; sealant in reglets; joints between skylight frames and edge trim; other exterior sealant joints Joints between block and window and door frames; sealant in reglets; joints between skylight frames and edge trim; other exterior sealant joints Nontraffic areas: joints between isolated slabs and slabs -on -grade Cast -in -place concrete joints Cast -in -place concrete joints Toilet rooms; showers; janitor rooms Joints between metal elements and CMU and concrete Cast -in -place concrete Joints between GWB and aluminum window units, GWB and woodwork Refer to: Section 07270, Firestopping, for systems and applications Refer to: Section 09500, Acoustical Treatment/Acoustical Insulation END OF SECTION 07901 1 TEC A Permit (',cxf°- AddfesS ay 0 description_ 2-- m0.tyv J r s �a�� ��,or AO-6(6 r n 0\ .0(Y 0 c, ella,(, 1 as finale�- the permit Date Number of technical pages vo`-)eyok- ‘Yloc\rwo.\ 0\00,(\e_ 1 b\v■SioY1S S40 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PROJECT MANUAL VOLUME 1B DIVISIONS 8 16 PROJECT #96160 00 SEPTEMBER 11 19-97 OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PROJECT MANUAL VOLUME 1B DIVISIONS 8 16 PROJECT #96160 00 SEPTEMBER 11 1997 MAHLUM NORDFORS MCKINLEY GORDON MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- THE PROJECT 1.1 IDENTIFICATION Olympic Memorial Hospital 2 Main/Surgery Additions Alterations 1.2 PROJECT ADDRESS Olympic Memorial Hospital 939 Caroline Street Port Angeles, Washington 98362 1.3 PROJECT DESCRIPTION See Section 01010 Summary of Work, for complete project description. 1.4 OWNER Olympic Memorial Hospital 1.5 OWNER'S PROJECT MANAGER 2.1 TITLE Mr. Mike Glenn (360) 417 -7703 PART 2 THE DOCUMENTS 2.2 DATE `The Construction Documents for the `Olympic Memorial Hospital 2 Main/Surgery Additions Alterations. The construction documents are dated September 11, 1997 PART 3 THE DESIGN TEAM 3.1 CERTIFICATION SECTION 00002 PAGE 1 INTRODUCTION I hereby certify that this project specification was prepared by me or under my direct supervision and that I am a duly registered architect under the laws of the State of Washington. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.2 ARCHITECT Mahlum Nordfors McKinley Gordon Vince Nordfors, Principal an Jardine, Project Manager Gary Braun, Project Architect Charles Nighbor Architect Naoto Sekiguchi, Architect Holly Johnson, Team Assistant 3.3 CONSULTANTS Mechanical Engineer Facility Support, Inc. (a.k.a. FSi) Rob Danforth, Project Manager Jill Connell, Project Engineer Electrical Engineer Sparling Katrina Corbett, Project Engineer Structural Engineer Martens/Chan Randy Martens, Project Principal Steve Sandhorst, Project Engineer Civil Engineer Northwestern Territories, Inc. Joe Donisi, Project Engineer Interior Designer Distinctive Designs by Julie, Inc. Julie Haguewood, Principal SECTION 00002 PAGE 2 INTRODUCTION 2505 Third Avenue, Suite 219 Seattle, Washington 98121 (206) 441-4151 (206) 441 -0478 (FAX) 605 First Avenue, Suite 400 Seattle, Washington 98121 (206) 622 -3321 (206) 622 -5804 (FAX) 720 Olive Way Suite 1100 Seattle, Washington 98101 -1853 (206) 667 -0555 (206) 667 -0554 (FAX) 400 Mercer St. Suite 410 Seattle, Washington 98109 (206) 298-9818 (206) 298 -9876 (FAX) 717 South Peabody Port Angeles, Washington 98362 (800) 654-5545 (360) 452 -8498 (FAX) 705 Christman Pl. Port Angeles, WA 98362 (360) 452 -3540 (360) 452 -6638 (FAX) MAHLUM NORDFORS McKINLEY GORDON. GORDON. OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 0 1997 Mahhan Nordfors McKinley Gordon SECTION 00002 PAGE 3 INTRODUCTION Cost Estimator Rider Hunt Ackroyd 999 Third Avenue, Suite 830 Peter Knowles, Project Estimator Seattle, Washington 98104 (206) 223-2055 (206) 223 -2056 (FAX) Hardware Consultant Frank Schelhamer 4015 192nd P1. SW Lynnwood, WA 98036 (206) 778-1232 END OF SECTION 00002 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS DESCRIPTION OF CONTENTS THE CONTRACT DOCUMENTS CONTAIN THE FOLLOWING. SECTION 00003 PAGE 1 TABLE OF CONTENTS VOLUME 1A PROJECT MANUAL Division 0 Bidding Requirements, Contract Forms, and Contract Division 1 General Requirements Divisions 2 7 Technical Specifications VOLUME 1B VOLUME 2 PROJECT DRAWINGS See Cover Sheet, Drawing A 0.1.2, for list of Drawings. VOLUME lA PROJECT MANUAL Unit Description No. of Pages DIVISION 0 BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE CONTRACT Section 00002 Introduction. 3 00003 Table of Contents 5 00030 Advertisements For Bids 2 00100 Instructions For Bidders 1 AIA Document A701 Instructions to Bidders, 1987 Edition 5 Supplementary Instructions 2 00220 Geotechnical Data. 1 Soils Report. 25 00300 Bid Form 3 00320 Bid Bond 1 00420 Bidder Qualification Form 4 00510 Form of Agreement 1 AIA Document A101 Form of Agreement, 1987 Edition 8 Supplementary Provisions 1 00515 Contract Transmittal 1 00520 Notice to Proceed 2 00700 General Conditions 1 AIA Document A201 General Conditions of the Contract, 1987 Edition 24 Supplementary Conditions of the Contract. 6 Special Conditions of the Contract 4 00900 Addenda 1 DIVISION 1 GENERAL REQUIREMENTS Section PROJECT MANUAL Divisions 8 -14 Division 15 Division 16. Technical Specifications Mechanical Specifications .Electrical Specifications 01010 Summary of Work 4 01011 Contract Time and Sequence 7 01014 Project Finishes and Openings 2 01026 Payment Procedures 3 Affidavit for Payment of Retained Percentage (Form MNMG1060) 1 01027 Schedule of Values 2 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 00003 PAGE 2 TABLE OF CONTENTS 01030 Base Bid and Alternates 2 01036 Change Order Procedures 2 Change Order Proposal (Form MNMG1038) 1 Change Order (Form MNMG 1039) 1 Architect's Supplemental Instructions (Form MNMG1036) 1 Construction Change Directive (Form MNMG1037) 1 01045 Cutting and Patching 4 01064 Seismic Anchorage Requirements 5 01065 Code and Permit Requirements 2 01091 Reference Standards 13 01095 Explanations, Definitions, Abbreviations, Symbols 5 01121 Hazardous Materials Procedures 2 01122 Hazardous Materials Report 1 01200 Project Meetings 2 Progress Meeting Agenda (Form MNMG 1068) 1 01300 Submittals 7 Submittal Cover Sheet/Transmittal (Form MNMG1046) 1 01310 Progress Schedule 3 01400 Quality Control 10 01500 Construction Facilities and Temporary Controls 6 State Fire Marshall Information Sheet A -1 1 01600 Material and Equipment 4 01610 Delivery Storage, and Handling 1 01630 Product Options and Substitutions 3 Substitution Request Form (Form MNMG1063). 1 01700 Contract Closeout 5 01710 Final Cleaning 2 01720 Project Record Documents 3 01745 Warranty Procedures 3 Contractor's Warranty 2 Subcontractor's Warranty 1 DIVISION 2 SITEWORK Section 02060 Building Demolition 4 02070 Selective Demolition 6 02110 Site Clearing 3 02160 Excavation Support Systems 4 02200 Earthwork. 9 02511 Hot -Mixed Asphalt Paving. 5 02520 Portland Cement Concrete Paving 15 02665 Water Systems. 11 02700 Sewerage and Drainage 14 02711 Foundation Drainage Systems. 5 02810 Irrigation Systems 12 02900 Landscaping 6 DIVISION 3 CONCRETE Section 03300 Cast -In -Place Concrete 03450 Architectural Precast Concrete Plant Cast. 03650 Cementitious Underlayment 16 9 3 1 r i 1 1 t r i 1 1 1 r MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS DIVISION 4 MASONRY Section 04200 Unit Masonry 9 DIVISION 5 METALS Section 05120 Structural Steel 7 05210 Steel Joists 4 05310 Steel Deck 6 05400 Cold- Framed Metal Framing. 11 05500 Metal Fabrications. 15 05510 Metal Stairs 7 05810 Expansion Joint Cover Assemblies. 7 DIVISION 6 WOOD AND PLASTICS Section 06100 Rough Carpentry 4 06200 Finish Carpentry 4 06402 Interior Architectural Woodwork. 9 06650 Solid Surface Wall Panels 3 DIVISION 7 THERMAL AND MOISTURE PROTECTION Section 07100 Concrete Sealers. 3 07120 Fluid- Applied Waterproofing 3 07210 Building Insulation 4 07241 Exterior Insulation and Finish Systems Class PB 11 07242 Direct Applied Exterior Finish System 7 07251 Fireproofmg 5 07270 Firestopping and Smokestopping 8 07412 Manufactured Wall Panels 4 07530 Single -Ply Membrane Roofing 5 07600 Flashing and Sheet Metal. 5 07716 Roof Specialties. 4 07720 Roof Accessories. 3 07820 Aluminum Framed Skylights 6 07901 Joint Sealants 8 VOLUME 1B PROJECT MANUAL Unit Description No. of Pages DIVISION 8 DOORS AND WINDOWS SECTION 00003 PAGE 3 TABLE OF CONTENTS Section 08110 Steel Doors and Frames 6 08211 Flush Wood Doors 5 08305 Access Doors. 5 08310 Aluminum Sliding Glass Doors 5 08410 Aluminum Entrances 7 08520 Aluminum Windows. 7 08710 Door Hardware 15 08800 Glazing 12 DIVISION 9 FINISHES Section 09255 Gypsum Board Assemblies. 13 09280 Glass- Reinforced Gypsum Fabrications. 3 09300 Ceramic Tile 6 09511 Acoustical Panel Ceilings 6 09660 Resilient Tile Floorings 4 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 09666 Sheet Vinyl Floor 5 09678 Resilient Base. 4 09680 Carpet. 7 09900 Painting 11 09950 Wall Coverings. 3 DIVISION 10 SPECIALTIES Section 10100 Visual Display Boards 3 10190 Cubicles 2 10200 Louvers and Vents 6 10265 Wall Surface Protection Systems. 5 10522 Fire Extinguishers 3 10800 Toilet and Bath Accessories 5 10990 Miscellaneous Specialties 3 DIVISION 11 EQUIPMENT Section 11452 Appliances 4 11700 Equipment 7 DIVISION 12 FURNISHINGS Section 12511 Horizontal Louver Blinds 2 12541 Draperies 2 DIVISION 13 SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 CONVEYING SYSTEMS Section 14240 Hydraulic Elevators. 7 14600 Pneumatic Tube System 4 DIVISION 1 5 MECHANICAL Section 15010 General Provisions 7 15020 Vibration Isolation 3 15030 Mechanical Painting and Identification. 3 15040 Balancing Air and Water Systems 4 15060 Piping and Fittings. 10 15070 Mechanical Systems Insulation 8 15090 Piping and Mechanical Equipment Support 6 15100 Valves. 4 15420 Soil, Waste, and Vent Systems 2 15440 Plumbing Fixtures and Trim 9 15480 Medical Gas Systems 10 15500 Automatic Fire Protection Systems 5 15640 Refrigeration Equipment. 4 15650 Liquid Heat Transfer Systems 3 15660 Steam Systems 3 15700 Air Handling Equipment. 9 15800 Air Distribution Systems. 11 15850 Air Filtration. 3 15900 Automatic Temperature Controls. 10 DIVISION 16 ELECTRICAL Section 16010 General Provisions 16020 Schedule 16030 Testing 16040 Identification SECTION 00003 PAGE 4 TABLE OF CONTENTS 8 2 4 1 1 a 1 1 i 1 1 1 1 1 1 1 1 1 t MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 00003 PAGE 5 TABLE OF CONTENTS 16051 Existing Systems 5 16100 Basic Materials and Methods 5 16110 Raceways. 4 16114 Cable Trays. 2 16115 Cable Rings. 1 16120 Conductors and Terminators, Copper Only 2 16130 Outlet, Junction, and Pull Boxes 3 16140 Switches and Receptacles 4 16160 Motor Controllers 3 16170 Disconnects and Fuse Switches 2 16180 Fuses 1 16190 Supporting Devices 5 16450 Grounding. 2 16470 Switchboard 1 16471 Panelboards. 3 Appendix 1 New Panelboards. 14 Appendix 2, Existing Panelboards w/ Modifications. 28 Appendix 3, Existing Panelboards to be Demolished. 8 16500 Lighting 8 16501 Light Fixture Schedule 6 16660 Isolated Power System 3 Appendix 1 New Panels. 15 Appendix 2, Existing Systems to be Demolished 6 16670 Equipotential Grounding System 2 16700 Communications. 2 16721 Fire Alarm System 14 16724 Smoke Damper Control. 2 16731 Elapsed Time Clocks 1 16732 Clock System. 3 16740 Telephone, Computer Raceway Systems. 2 16750 Nurse Call 8 16758 Intercom Systems. 3 16775 Public Address System 3 16781 Television Distribution System Completion 4 16791 Dictation Raceway System. 1 16930 Lighting Control Equipment 1 16950 Pneumatic Tube System 1 16999 Project Closeout 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS DIVISION AD ARCHITECTURAL DETAILS See Drawings DIVISION A ARCHITECTURAL SCHEDULES See Drawings VOLUME 2 PROJECT DRAWINGS Unit Description DIVISION A ARCHITECTURAL DRAWINGS See Drawing A0.1.2 for Complete List of Architectural Drawings DIVISION C CIVIL DRAWINGS See Drawing A0.1.2 for Complete List of Civil Drawings DIVISION S STRUCTURAL DRAWINGS See Drawing A0.1.2 for Complete List of Structural Drawings DIVISION PTS PNEUMATIC TUBE SYSTEM DRAWINGS See Drawing A0.1.2 for Complete List of Pneumatic Tube System Drawings DIVISION M MECHANICAL DRAWINGS See Drawing A0.1.2 for Complete List of Mechanical Drawings DIVISION E ELECTRICAL DRAWINGS See Drawing A0.1.2 for Complete List of Electrical Drawings 1997 Mahlum Nardfon McKinley Gordon SECTION 00003 PAGE 6 TABLE OF CONTENTS END OF SECTION 00003 1 1 r 1 r 1 1 s t t 1 A 1 i r 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY SECTION 08110 PAGE 1 STEEL DOORS AND FRAMES A. This Section includes the following products manufactured in accordance with SDI Recommended Standards: 1 Doors: Flush, hollow or composite construction standard steel doors for interior and exterior locations (if any 2. Frames: Pressed steel flames for doors, transoms, sidelights, mullions, interior glazed panels, and other interior and exterior openings of following type: a. Welded unit type. 3 Assemblies: Provide standard steel door and frame assemblies as required for the following: a. Labeled and fire rated. 4 Provide factory primed doors and frames to be field painted. 5 Sliding glass relite track hardware. B. Painting primed doors and frames is specified in Division 9 Section "Painting." C Wood doors are specified in Division 8 Section "Flush Wood Doors." D Door hardware is specified in Division 8 Section "Door Hardware." E. Glass and Glazing are specified in Division 8 Section "Glazing." 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B Product data for each type of door and frame specified, including details of construction, materials, dimensions, hardware preparation, core, label compliance, sound ratings, profiles, and finishes. C. Shop drawings showing fabrication and installation of standard steel doors and frames. Include details of each frame type, elevations of door design types, conditions at openings, details of construction, location and installation requirements of door and frame hardware and reinforcements, and details of joints and connections. Show anchorage and accessory items. 1 Provide schedule of doors and frames using same reference numbers for details and openings as those on contract drawings. 2. Indicate coordinate of glazing frames and stops with glass and glazing requirements. D Label Construction Certification: For door assemblies required to be fire-rated and exceeding limitations of labeled assemblies, submit manufacturer's certification that each door and frame assembly has been constructed to conform to design, materials and construction equivalent to requirements for labeled construction. MAHLUM NORDFORS MCKZNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.4 QUALITY ASSURANCE SECTION 08110 PAGE 2 STEEL DOORS AND FRAMES A. Provide doors and frames complying with Steel Door Institute "Recommended Specifications Standard Steel Doors and Frames" ANSI/SDI -100 and as herein specified. B. Fire -Rated Door Assemblies: Units that comply with NFPA 80, are identical to door and frame assemblies whose fire resistance characteristics have been determined per ASTM E 152 and which are labeled and listed by UL, Factory Mutual, Warnock Hersey or other testing and inspecting organization acceptable to authorities having jurisdiction. 1.5 DELIVERY STORAGE, AND HANDLING A. Deliver doors and frames cardboard- wrapped or crated to provide protection during transit and job storage. Provide additional protection to prevent damage to finish of factory- finished doors and frames. B. Inspect doors and frames upon delivery for damage. Minor damages may be repaired provided refinished items are equal in all respects to new work and acceptable to Architect; otherwise, remove and replace damaged items as directed. C. Store doors and frames at building site under cover Place units on minimum 4- inches high wood blocking. Avoid use of non vented plastic or canvas shelters which could create humidity chamber If cardboard wrapper on door becomes wet, remove carton immediately Provide 1/4- inches spaces between stacked doors to promote air circulation. PART 2 PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. Manufacturer Subject to compliance with requirements, provide standard steel doors and frames by one of the following: 1 Standard Steel Doors and Frames: a. Ceco Corp. b. Curries Company c. Fenestra Corp. d. Kewanee Corp. e. Mesker Door Co. f. Pioneer Industries. g. Republic Builders Products. h. Steelcraft Manufacturing Co. i. Stiles Custom Hollow Metal 2. Sliding Glass Relite Track Hardware a. Knape Vogt Mfg. Co. b Others as approved by addendum. 2.2 MATERIALS A. Hot Rolled Steel Sheets and Strip Commercial quality carbon steel, pickled and oiled, complying with ASTM A 569 and ASTM A 568. 1 t t i i 1 1 1 1 1 1 1 I 1 1 1 1 r i 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 08110 PAGE 3 STEEL DOORS AND FRAMES B. Cold -Rolled Steel Sheets: Commercial quality carbon steel, complying with ASTM A 366 and ASTM A 568. C. Galvanized Steel Sheets: Zinc coated carbon steel sheets of commercial quality complying with ASTM A 526, or drawing quality ASTM A 642, hot dipped galvanized in accordance with ASTM A 525 with A60 or G60 coating designation, mill phosphatized D Supports and Anchors: Fabricate of not less than 18 -gage sheet steel; galvanized where used with galvanized frames. E. Inserts, Bolts, and Fasteners: Manufacturer's standard units. Where items are to be built into exterior walls, hot -dip galvanize in compliance with ASTM A 153 Class C or D as applicable. F Shop Applied Paint: Apply after fabrication. 1 Primer Rust inhibitive enamel or paint, either air -drying or baking, suitable as a base for specified finish paints complying with ANSI A224 1, "Test Procedure and Acceptance Criteria for Prime Painted Steel Surfaces for Steel Doors and Frames." 2.3 FRAMES A. Provide metal frames for doors, transoms, sidelights, borrowed lights, and other openings, of types and styles as shown on drawings and schedules. Conceal fastenings, unless otherwise indicated. Fabricate frames of minimum 18 -gage cold rolled steel. 1 Fabricate frames with mitered, coped, or welded corners. 2. Form exterior frames from 16 -gage galvanized steel. B. Door Silencers: Except on weather stripped frames, drill stops to receive 3 silencers on strike jambs of single- door frames and 2 silencers on heads of double- door frames. C. Plaster Guards: Provide minimum 26 -gage steel plaster guards or mortar boxes at back of hardware cutouts where mortar or other materials might obstruct hardware operation and to close off interior of openings. D Finish Hardware Reinforcement: Reinforce frames for required finish hardware as follows: 1 Hinges: Steel plate 3/16 inch thick by 1 1/2 inch wide by 6 inches longer than hinge, secured by not less than six spot- welds. 2. Strike Plate Clips: Steel plate 3/16 inch thick by 1 -1/2 inch wide by 4 inches long. 3 Surface- Applied Closers: 12 -gage steel sheet secured with not less than six spot welds. 4 Concealed Closers: Removable steel access plate, 12 -gage internal reinforcement of size and shape required and enclosing housing to keep closer pocket free of mortar or other materials. Reinforcement for other moving items to meet SDI -107 1978. E. Wall Anchors 1. General. Furnish wall anchors as required to secure frames to adjacent construction formed of not less than 18 -gage galvanized steel. 2. Masonry Construction. Adjustable, flat or corrugated, or perforated, T- shaped to suit frame size with leg not less than 2 inches wide by 10 inches long. Furnish at least four anchors per jamb up to 7- foot -6 -inch height, five anchors up to 8 -foot jamb height, one additional anchor for each 24 inches or fraction thereof over 8 -foot height. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3 Metal Stud Partitions: Insert type with notched clip to engage metal stud, welded to back of frames. Provide at least four anchors for each jamb for frames up to 7 feet 6 inches in height, five anchors up to 8 -foot jamb height, one additional anchor for each 24 inches or fraction thereof over 8 -foot height. 4 In -place Concrete or Masonry Anchor frame jambs with minimum 3/8 -inch concealed bolts into expansion shields or inserts at 6 inches from top and bottom and 26 inches on center, unless otherwise shown. Reinforce frames at anchor locations and fully grout. Apply removable stop to cover anchor bolts unless otherwise indicated. F Floor Anchors: Provide floor anchors for each jamb and mullion which extends to floor, formed of not less than 16 -gage galvanized steel sheet as follows: 1 Monolithic Concrete Slabs: Clip type anchors with two holes per clip anchor to receive fasteners, welded to bottom of jambs and mullions. 2. Separate Topping Concrete Slabs: Adjustable type with extension clips. Terminate bottom of frames at finish floor surface. G. Head Anchors: Provide two anchors at head of frames exceeding 42 inches wide for frames mounted in steel stud walls. H. Structural Reinforcing Members 1 Provide structural reinforcing members as a part of frame assembly where indicated or required at mullions, transoms, or other locations which are to be built into frame. 2. Provide reinforcing of head and muntin members at openings greater than 48- inches. 3 Provide reinforcing of jamb members at units containing more than two pairs of doors. Head Reinforcing: For frames over 4 feet wide, provide two continuous steel angles not less than 2 inches by 2 inches by 12 gage and width of opening, welded to back of frame at head, unless otherwise shown. J Spreader Bars: Provide two removable spreader bars across bottom of frames; tack welded to jambs and mullions. K. Sound Deadening: Coat inside (concealed) faces of door jambs in hollow wall construction with plaster Coating shall cover concealed surfaces to the fullest extent possible. Apply over shop primer approximately 1/2 inch minimum thick and allow to dry before handling. Grout solid all exterior frames or frames in masonry walls. 2.4 FABRICATION SECTION 08110 PAGE 4 STEEL DOORS AND FRAMES A. Fabricate steel door and frame units to be rigid, neat in appearance and free from defects, warp or buckle. Wherever practicable, fit and assemble units in manufacturer's plant. Clearly identify work that cannot be permanently factory- assembled before shipment, to assure proper assembly at project site. Comply with ANSI /SDI -100 requirements. 1 Clearances: Not more than 1/8 inch at jambs and heads except between non fire -rated pairs of doors not more than 1/4 inch. Not more than 3/4 inch at bottom. B. Fabricate exposed faces of doors and panels from only cold -rolled steel. C. Tolerances: Comply with SDI 117 "Manufacturing Tolerances Standard Steel Doors and Frames." 1 t 1 1 1 1 i 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 08110 PAGE 5 STEEL DOORS AND FRAMES D Fabricate frames, concealed stiffeners, reinforcement, edge channels, louvers and moldings from either cold- rolled or hot rolled steel. E. Exposed Fasteners: Unless otherwise indicated, provide countersunk flat or oval heads for exposed screws and bolts. F Hardware Preparation. Prepare doors and frames to receive mortised and concealed hardware in accordance with final Door Hardware Schedule and templates provided by hardware supplier Comply with applicable requirements of ANSI A115 Series Specifications for door and frame preparation for hardware. G. Reinforce doors and frames to receive surface- applied hardware. Drilling and tapping for surface- applied hardware may be done at project site. H. Locate hardware as indicated on final shop drawings or, if not indicated, in accordance with "Recommended Locations for Builder's Hardware on Standard Steel Doors and Frames," published by Door and Hardware Institute. Shop Painting: Clean, treat, and paint exposed surfaces of steel door and frame units, including galvanized surfaces. 1 Clean steel surfaces of mill scale, rust, oil, grease, dirt, and other foreign materials before application of paint. 2. Apply shop coat of prime paint of even consistency to provide a uniformly finished surface ready to receive finish paint. 2.5 SLIDING GLASS RELITE HARDWARE A. Provide sliding track assembly at relites as shown on drawings. Conceal fastenings, unless otherwise indicated. Fabricate frames of zinc plated steel with full ball bearing carriers on 3 inch centers. 1 Quality Standard Product: Knape Vogt P992 Roll Ezy ball bearing steel track assembly PART 3- EXECUTION 3.1 INSTALLATION A. General. Install standard steel doors, frames, and accessories in accordance with final shop drawings, manufacturer's data, and as herein specified. B. Placing Frames: Comply with provisions of SDI -105 "Recommended Erection Instructions For Steel Frames," unless otherwise indicated. 1 Sound deaden frames with vermiculite plaster Grout fire-rated frames in accordance with NFPA 80 and UBC 43 -2 2. Except for frames located at existing concrete, masonry or drywall installations, place frames prior to construction of enclosing walls and ceilings. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is completed, remove temporary braces and spreaders leaving surfaces smooth and undamaged. 3 Provide at least three wall anchors per jamb at hinge and strike levels and minimum 18- gage base anchors. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 4 At existing concrete or masonry construction, provide 3 completed opening anchors per jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb, set frames and secure to adjacent construction with bolts and masonry anchorage devices. 5 Install fire -rated frames in accordance with NFPA Standard No. 80 6. In metal stud partitions, install at least 3 wall anchors per jamb at hinge and strike levels. C. Sliding Relite Track Assemblies: Coordinate installation with glazer Install in custom hollow metal frames as detailed, so that top of track is flush with frame. 3.2 ADJUST AND CLEAN A. Prime Coat Touch -up Immediately after erection, sand smooth any rusted or damaged areas of prime coat and apply touch -up of compatible air -drying primer. B. Protection Removal. Immediately prior to final inspection, remove protective plastic wrappings from prefinished doors. C. Final Adjustments: Check and readjust operating hardware items, leaving steel doors and frames undamaged and in complete and proper operating condition. D Adjust sliding relite track for smooth operation. 0 1997 Mahhun Nordfors McKinley Gordon SECTION 08110 PAGE 6 STEEL DOORS AND FRAMES 3.3 SCHEDULE A. Provide hollow metal frames as scheduled at doors and relite openings, unless otherwise noted. B. Provide sliding relite track assemblies at locations shown on Project Drawings. C Refer to project drawings, including but not limited to, plans, elevations, sections, details, and schedules. END OF SECTION 08110 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 08211 PAGE 1 FLUSH WOOD DOORS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division -1 Specification sections, apply to work of this section. 1.2 SUMMARY A. This section includes solid core flush wood doors. Extent and location of each type of flush wood door is indicated on drawings and in schedules. B. Types of doors include the following: 1. Solid core flush wood doors with plastic laminate finish. 2. Solid core flush wood doors to be painted. 3 Existing solid core flush wood doors to be refinished with paint or plastic laminate 4 Preparation of doors to receive louvers; louvers specified elsewhere. 5 Preparation of doors to receive glazing; glazing specified elsewhere. C. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 8 Section "Standard Steel Doors and Frames" 2. Division 8 Section "Hardware" for hardware types and installation. 3 Division 8 Section `Glazing' for door lite glass. 4 Division 9 Section `Gypsum Board Assemblies' for reinforcement at door openings. 1.3 SUBMITTALS A. Product Data. Door manufacturer's technical data for each type of door, including details of core and edge construction, trim for openings, and factory- finishing specifications. B. Shop Drawings: Submit shop drawings indicating location and size of each door, elevation of each kind of door, details of construction, location and extent of hardware blocking, fire ratings, requirements for factory finishing and other pertinent data. 1 For factory-pre machined doors, indicate dimensions and locations of cutouts for locksets and other cutouts adjacent to light and louver openings. 1.4 QUALITY ASSURANCE A. Quality Standards: Comply with the following standards: 1 NWWDA Quality Standard: I.S.1 "Industry Standard for Wood Flush Doors" of National Wood Window and Door Association (NWWDA). 2. AWI Quality Standard: "Architectural Woodwork Quality Standards" including Section 1300 "Architectural Flush Doors" of Architectural Woodwork Institute (AWI) for grade of door, core construction, finish and other requirements exceeding those of NWWDA quality standard. B. Fire -Rated Wood Doors: Provide wood doors which are identical in materials and construction to units tested in door and frame assemblies per ASTM E 152 and which are labeled and listed for ratings indicated by UL or Warnock Hersey MAHLUM NORDFORS MCK7NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2•MAIN /SURGERY ADDITIONS ALTERATIONS C. Manufacturer Obtain doors from a single manufacturer 1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING SECTION 08211 PAGE 2 FLUSH WOOD DOORS A. Protect doors during transit, storage and handling to prevent damage, soiling and deterioration. Comply with requirements of referenced standards and recommendations of NWWDA pamphlet "How to Store, Handle, Finish, Install, and Maintain Wood Doors" as well as with manufacturer's instructions. B. Identify each door with individual opening numbers which correlate with designation system used on shop drawings for door, frames, and hardware, using temporary removable or concealed markings. 1.6 PROJECT CONDITIONS A. Conditioning: Do not deliver or install doors until conditions for temperature and relative humidity have been stabilized and will be maintained in storage and installation areas during remainder of construction period to comply with the following requirements applicable to project's geographical location. 1 Referenced AWI quality standard including Section 100 -S -3 "Moisture Content" 1.7 WARRANTY A. General. Warranties shall be in addition to, and not a limitation of, other rights the Owner may have under the Contract Documents. B. Door Manufacturer's Warranty Submit written agreement in door manufacturer's standard form signed by Manufacturer, Installer and Contractor, agreeing to repair or replace defective doors that have warped (bow cup or twist) or that show telegraphing of core construction in face veneers, or do not conform to tolerance limitations of referenced quality standards. 1 Warranty shall also include reinstallation which may be required due to repair or replacement of defective doors where defect was not apparent prior to hanging. 2. Warranty shall be in effect during following period of time after date of Substantial Completion. 3 Solid Core Interior Doors: PART 2 PRODUCTS a. Life of installation. C. Contractor's Responsibilities: Replace or refinish doors where Contractor's work contributed to rejection or to voiding of manufacturer's warranty 2.1 MANUFACTURERS A. Manufacturer Subject to compliance with requirements, provide products of one of the following: 1 Solid Core Doors with High Pressure Decorative Laminate Faces: a. Eggers Industries, Architectural Door Division. b. Georgia Pacific c. Lynden Door d. Mohawk Flush Doors, Inc. r 1 i 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS e. Cenco Door f. Vancouver Door, Inc. g. Western Oregon Door h. Weyerhauser Company 2.2 INTERIOR FLUSH WOOD DOORS A. Solid Core Doors High Pressure Decorative Laminate Finish: Comply with the following requirements: 1 Faces: High Pressure Decorative Laminate 2. AWI Grade: Custom. 3 Construction. PC- HPDL -5 B. Solid Core Doors Paint Finish. Comply with the following requirements: 1. Faces: Paint grade Birch or other close grain hardwood 2. AWI Grade: Custom. 3 Construction. PC -7 -CE. C. Fire-Rated Solid Core Doors: Comply with the following requirements. 1 Faces and AWI Grade: Provide faces and grade to match non -rated doors in same area of building, unless otherwise indicated. 2. Construction. Manufacturer's standard core construction as required to provide fire resistance rating indicated. 3 Edge Construction. Provide manufacturer's standard laminated edge construction for improved screw holding capability and split resistance as compared to edges composed of a single layer of treated lumber a. Provide fire-rated pairs with fire retardant stiles which are labeled and listed for kinds of applications indicated without formed steel edges and astragals. D Plastic Laminate for Existing Doors: GP50 high pressure decorative laminate. Refer to Finish Plan and Finish Schedule in Volume 1 Project Drawings for color and manufacturer E. Adhesive for Bonding Plastic Laminate to Existing Doors: Contact adhesive. 2.3 LIGHT FRAMES A. Metal Frames for Light Openings in Fire Doors: Manufacturer's standard frame formed of 18- gage cold rolled steel, factory- pruned, and approved for use in door of fire rating indicated. 2.4 FABRICATION SECTION 08211 PAGE 3 FLUSH WOOD DOORS A. Fabricate flush wood doors to produce doors complying with following requirements: 1 Factory-prefit and premachine doors to fit frame opening sizes indicated with the following uniform clearances and bevels: a. Comply with tolerance requirements of AWI for prefitting. Comply with final hardware schedules and door frame shop drawings and with hardware templates. b. Coordinate measurements of hardware mortises in metal frames to verify dimensions and alignment before proceeding with factory premachining. MAHLUM NORDFORS MCIdNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 08211 PAGE 4 FLUSH WOOD DOORS B. Metal Astragals: Premachine astragals and formed steel edges for hardware where required for pairs of fire-rated doors. C. Openings: Cut and trim openings through doors to comply with applicable requirements of referenced standards for kind(s) of doors required. 1 Light Openings: Trim openings with moldings of material and profile indicated. PART 3- EXECUTION 3.1 EXAMINATION A. Examine installed door frames prior to hanging door 1 Verify that frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with plumb jambs and level heads. 2. Reject doors with defects. B. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Hardware: For installation see Division -8 "Door Hardware" section of these specifications. B. Manufacturer's Instructions: Install wood doors to comply with manufacturer's instructions and of referenced AWI standard and as indicated. 1. Install fire -rated doors in corresponding fire -rated frames in accordance with requirements of NFPA No. 80 C. Job -Fit Doors: Align and fit doors in frames with uniform clearances and bevels as indicated below do not trim stiles and rails in excess of limits set by manufacturer or permitted with fire-rated doors. Machine doors for hardware. Seal cut surfaces after fitting and machining. 1 Fitting Clearances for Non -Rated Doors: Provide 1/8" at jambs and heads; 1/16" per leaf at meeting stiles for pairs of doors; and 1/8" from bottom of door to top of decorative floor finish or covering. Where threshold is shown or scheduled, provide 1/4" clearance from bottom of door to top of threshold. 2. Fitting Clearances for Fire -Rated Doors: Complying with NFPA 80 3 Bevel non -rated doors 1/8" in 2" at lock and hinge edges. 4 Bevel fire-rated doors 1/8" in 2" at lock edge; trim stiles and rails only to extent permitted by labeling agency D Prefit Doors: Fit to frames for uniform clearance at each edge. 3.3 ADJUSTING AND PROTECTION A. Operation. Rehang or replace doors which do not swing or operate freely B Finished Doors: Refinish or replace doors damaged during installation. C. Protect doors as recommended by door manufacturer to ensure that wood doors will be without damage or deterioration at time of Substantial Completion. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 REFINISHING EXISTING DOORS WITH NEW PLASTIC LAMINATE FACES SECTION 08211 PAGE 5 FLUSH WOOD DOORS A. Remove existing doors from frames. Retain and protect butts and hinge pins. Remove existing hardware. B. Sand existing paint finish from door faces completely using progressively finer grit of sandpaper to achieve smooth, blemish free surface at original veneer. C. Prep door for new hardware if scheduled. D Clean door faces to remove all dust and oils. E. Cut and trim plastic laminate to fit existing door faces. Apply plastic laminate to door faces per adhesive manufacturer's instructions. Allow adhesive to set and cure fully F Rehang door and check for proper clearances. Chamfer edges or adjust hinges to assure that doors swing and operate freely G. Reinstall existing hardware or install new hardware as scheduled. 3.5 REFINISHING EXISTING PAINTED, DOORS A. Remove existing doors from frames. Retain and protect butts and hinge pins. Remove existing hardware. B. Sand existing paint finish to achieve smooth, blemish free, sound surface. It is not necessary to remove all of the existing paint coating. C. Prep door for new hardware if scheduled. D Clean door faces to remove all dust and oils. E. Paint doors per Division 9 Section `Painting. F Rehang door and check for proper clearances. Adjust to swing and operate freely G. Reinstall existing hardware or install new hardware as scheduled. 01997 Mahlum Nordfors McKinley Gordon END OF SECTION 08211 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of access doors: 1. Ceiling access doors. 2. Wall access doors. B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 9 Section "Gypsum Board Assemblies" for gypsum board walls and ceilings. 2. Division 15 Sections Air Distribution Systems. 1.3 SUBMITTALS B. Product data for each type of access door assembly specified, including details of construction relative to materials, individual components, profiles, finishes, and fire- protection ratings (if required). 1 Include complete schedule, including types, general locations, sizes, wall and ceiling construction details, latching or locking provisions, and other data pertinent to installation. SECTION 08305 PAGE 1 ACCESS DOORS A. General. Submit each item in this Article according to the Conditions of Contract and Division 1 Specification Sections. 1.4 QUALITY ASSURANCE A. Single -Source Responsibility Obtain access doors for entire Project from one source and by a single manufacturer B. Size Variations: Obtain Architect's acceptance of manufacturer's standard size units, which may vary slightly from sizes indicated. 1.5 COORDINATION A. Verification: Determine specific locations and sizes for access doors needed to gain access to concealed equipment, junction boxes, and dampers, and indicate on schedule specified under "Submittals" Article. PART 2- PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: 1 Cesco Products. 2. J.L. Industries. 3 Karp Associates, Inc. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 4 Larsen's Manufacturing Co. 5 Milcor, Inc. 6. Nystrom, Inc. 2.2 MATERIALS A. Steel Sheet: ASTM A 366/A 366M commercial -quality cold -rolled steel sheet with baked -on, rust- inhibitive primer B. Zinc Coated Steel Sheet: ASTM A 591/A 591M, Electrolytic zinc coated steel sheet with Class C coating and phosphate treatment to prepare surface for painting. 2.3 ACCESS DOORS A. General. Furnish each access door assembly manufactured as an integral unit, complete with all parts and ready for installation. B. Locking Devices 1 Provide flush key operated lock with steel cam. 2. Automatic self- closing panels. C. Access Door Assembly 1 1. Type: Flush door panel with concealed frame 2. Substrate: Gypsum board 3 Fire Rating: 1 hour (B) 4 Frame: 22 -gage galvanized steel drywall bead 5 Door 20 -gage steel flush panel 6 Hinge: Concealed pin hinge 7 Latch. Ring -turn or key as selected by the Owner 8. Finish. Baked -on prime coat 9 Quality Standard Product: Nystrom IW Series D Access Door Assembly 2 1 Type: Recessed door panel with exposed frame 2. Substrate: Gypsum wallboard 3 Fire Rating: Non -rated 4 Frame: 14 -gage stainless steel 5 Door 16 -gage stainless steel 6 Hinge: Concealed pivoting rod hinge 7 Latch. Screw driver access 8. Finish. Baked -on prime finish 9 Quality Standard Product: Nystrom IT Series E. Access Door Assembly 3 (Ceilings) 1 Type: Recessed panel door concealed flange SECTION 08305 PAGE 2 ACCESS DOORS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i t MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2. Substrate: Gypsum wallboard 3 Fire Rating: Non -rated 4 Frame: 16 -gage steel 5 Door 14 -gage steel 6. Hinge: Continuous piano hinge 7 Finish. Baked -on prime coat 8. Quality Standard Product: Nystrom NW Series F Access Door Assembly 4 (Lay -in Ceiling) 1 Type: Recess door panel door, exposed flange 2. Substrate: Suspended ceiling grid 3 Fire Rating: Non -rated 4 Frame: 20 gauge 5 Door 20 gauge 6 Hinge: Concealed, continuous piano hinge 7 Finish. Baked -on prime coat. 8. Size: 36 x 24 inches 9 Quality Standard Product: Karp KSTE SECTION 08305 PAGE 3 ACCESS DOORS 2.3 LATCHING DEVICES A. Furnish latching devices in number required to hold door in flush, smooth plane when closed. 2.4 FABRICATION A. Access Doors and Frames 1. General a. Fabricate units of continuous welded steel construction. b. Grind welds smooth and flush with adjacent surfaces. c. Furnish attachment devices and fasteners of type required to secure access doors to types of substrate indicated. 2. Frames a. For exposed frame, fabricate with exposed flange nominal 1 inch wide around perimeter of frame. b. For concealed frames in gypsum board construction, furnish perforated flanges with drywall bead. c. Furnish frames for installation in masonry construction with adjustable masonry anchors. 3 Doors a. Flush Panel Doors (1) Fabricate from sheet steel of gage indicated MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 08305 PAGE 4 ACCESS DOORS (2) For fire-rated units, provide manufacturer's standard insulated flush doors with continuous piano hinge and self- closing mechanism and interior side safety latch release. b. Recessed Panel Doors (1) Fabricate from sheet steel, of gage indicated, with face of door formed to provide recess below surface of applied finish. (2) Reinforce door as required to prevent buckling. B. Shop/Factory Finishing: Finish door assembly with door manufacturer's standard factory- applied prime paint. PART 3- EXECUTION 3.1 PREPARATION A. Advise Installers of other work about specific requirements relating to access door installation, including sizes of openings to receive access door and frame, as well as locations of supports, inserts, and anchoring devices. Furnish inserts and anchoring devices for access doors that must be built into other construction. Coordinate delivery with other work to avoid delay B. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work will be construed as acceptance of conditions. C. Examine all openings where access doors are to be installed to verify acceptability for proper installation. Immediately. notify Architect of any unacceptable conditions. Do not proceed until all unacceptable conditions have been corrected. 3.2 INSTALLATION A. Comply with manufacturer's instructions for installing access doors. B. Coordinate installation with work of other trades. C. Set frames accurately in position and securely attach to supports with face panels plumb or level in relation to adjacent finish surfaces. D Adjust hardware and panels after installation for proper operation. E. Remove and replace doors or frames which are warped, bowed, or otherwise damaged. 3.3 ADJUST AND CLEAN A. Adjust hardware and panels after installation for proper operation. B Remove and replace panels or frames that are warped, bowed, or otherwise damaged. 3.4 SCHEDIJLE A. Install access doors throughout as indicated on drawings or as required for code mandated access into concealed spaces. B. Proved zinc coated access doors where they occur in showers, baths, toilet rooms, and janitors and housekeeping closets. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 08305 PAGE 5 ACCESS DOORS C. Install door assembly 4 in all gypsum board ceilings. D Install door assembly 1 in all masonry walls. E. Install door assembly 3 in all gypsum board wall unless the wall assembly is scheduled to be a fire -rated assembly in which case door assembly 2 shall be used. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 08305 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provision of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 DESCRIPTION A. Provide materials, labor, equipment, inspection, coordination, and supervision necessary for the best installation per industry standards of sliding doors as indicated in this specification and the project drawings. B. Work includes: 1 Sliding doors and tracks. 2. Sliding doors without floor tracks 3 Glazing for sliding doors. 1.3 SUBMITTALS SECTION 08310 PAGE 1 ALUMINUM SLIDING GLASS DOORS C. Related work specified elsewhere includes: 1 Division 7 Section `Joint Sealants' for caulking around frames. 2. Division 8 Section `Glazing' for Glass types required. 3 Gypsum wall board, Division 9 Section `Gypsum Board Assemblies' for metal stud framing and gypsum board. A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B Product Data. Submit for each type of sliding door specified, including manufacturer's standard construction details, dimensions of individual components, profiles, finishes, hardware, and accessories. C. Shop Drawings: Submit for each type of sliding door including wall elevations, typical unit elevations, glazing details, and full -size details of typical composite members. D Samples: The Architect reserves the right to require additional samples that show fabrication techniques and workmanship and design of hardware and accessories. E. Product Certificates: Submit certificates signed by the manufacturer certifying that door units comply with specified performance requirements. F Product Test Reports: From, and based on tests performed by a qualified independent testing laboratory evidencing compliance of sliding door units with requirements indicated. 1.4 QUALITY ASSURANCE A. General. Comply with Section 01400 Quality Control. B. Single Source Responsibility Provide sliding glass doors produced by a single fabricator with not less than 5 years successful experience in the fabrication of similar sliding doors. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 2- PRODUCTS 2.1 ALUMINUM SLIDING GLASS DOOR SECTION 08310 PAGE 2 ALUMINUM SLIDING GLASS DOORS C. Standards: Aluminum Sliding Glass Door Comply with provisions of AAMA 101 for standards of performance and fabrication workmanship for aluminum sliding glass doors. D Design Criteria. The drawings are based on a specific type and model of sliding glass door by a single manufacturer An equivalent type of sliding glass door by another listed manufacturer may be accepted provided deviations in dimensions and profiles are minor and do not materially detract from the design concept or intended performance as judged solely by the Architect. 1.5 DELIVERY STORAGE, AND HANDLING A. Comply with Section 01610, Delivery Storage, and Handling. 1.6 PROJECT CONDITIONS A. Verify conditions at site affecting work to ensure the best installation per industry standards. B. Check actual door openings in construction work by accurate field measurement before fabrication. Show recorded measurements on final shop drawings. C. Coordinate fabrication schedule with construction progress to avoid delay Where necessary proceed with fabrication without field measurements and coordinate fabrication tolerances to ensure proper fit of sliding glass door units. 1.7 SCHEDULING A. Comply with Section 01310 Progress Schedule. 1.8 WARRANTY A. Comply with Section 01745 Warranty Procedures B Submit a written warranty signed by the manufacturer agreeing to repair or replace door units which fail in materials or workmanship within the specified warranty period. Failures include, but are not limited to, structural failures, including excessive deflection, faulty operation of movable panels or hardware, deterioration of metals, finishes, and other materials beyond normal wear C. Warranty period for sliding glass doors is one year after the date of substantial completion. D This warranty shall be in addition to, and not a limitation of, other rights the Owner may have against the Contractor under the contract documents. A. Acceptable Manufacturers: Subject to compliance with requirements, manufacturers offering aluminum sliding glass door units that may be incorporated in the Work include, but are not limited to, the following: 1 Door- O -Matic 2. Stanley Access Technologies 3 Horton Automatics 4 Besam Co. Inc. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIdNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 5 Others as approved by Addenda SECTION 08310 PAGE 3 ALUMINUM SLIDING GLASS DOORS B. Quality Standard Products 1 Sliding Doors with Recessed Floor Track: `Slim -Line ICU /CCU" manual sliding door, recess in floor installation with threshold, full break -out as manufactured by Door -0- Matic 2. Sliding Doors Without Floor Tracks: `Slim -Line ICU /CCU single sliding door, top of floor installation, trackless, full break -out as manufactured by Door -O- Matic. C. Description. Sliding Doors with Recessed Floor Track 1 General. Door units shall include header and track, jambs, sliding door, sidelite, and recessed guides. 2. Clear Opening: Full opening of sliding door, without utilizing break -out feature, shall provide 48 inch clear opening. 3 Material. All structural aluminum sections shall be 6063T -5 alloy not less than 0 125 inch thick with safety radius corners on all vertical rails. 4 Construction. Doors and sidelights shall be heavy duty 3/8 inch diameter rod bolted construction with 1 3/4 inch thick by 5 inch height door rails, with the exception of the top rail on the sliding door which is 2 1/2 inches high for proper sight line and 1 3/4 inch thick by 2 inch high intermediate rails. Sliding doors shall be hung from a carrier with fully adjustable door support for sag -free doors. Sliding doors shall slide on the inside of the sidelights. Door suspension system shall be over centerline of door Adjustable anti-riser stops shall be provided to prevent derailing. Roller assemblies shall be constructed using 1 -3/4 inch diameter nylon wheels. Doors shall be hung on a single pivot support which shall allow doors to swing out 90 degrees. Non adjustable magnetic latch shall provide release for emergency breakaway Swing out sidelights shall be provided to allow the sliding panel to swing out 90 degrees from any position in its sliding mode. Sliding doors shall be provided with electric grounding against static electricity 5 Finishes: All exposed surfaces shall be Class II clear anodized finish AA- M12C22A31 6 Hardware: Provide sliding panels with recess pulls. Swinging sidelites to be provided with surface pulls on one side only 7 Glass and Glazing: Provide safety glazing materials that comply with ANSI Z97 1 and requirements of Section 08800 Glazing. D Description: Sliding Doors Without Floor Tracks. 1 General. Door units shall include header and track, jambs, sliding door, sidelite, and recessed track at sidelite. 2. Clear Opening: Full opening of sliding door, without utilizing break -out feature, shall provide 48 inch clear opening. 3 Material. All structural aluminum sections shall be 6063T 5 alloy not less than 0 125 inch thick with safety radius corners on all vertical rails. 4 Construction. Doors and sidelights shall be heavy duty 3/8 inch diameter rod bolted construction with 1 -3/4 inch thick by 5 inch height door and top rails and 1 -3/4 inch thick by 2 inch high intermediate rails. Header shall be 2 -1/2 inches high by 4 -1/2 inches wide. Sliding doors shall be supported and guided when broken away by the combination support guide on the sliding door and a roller assembly on the sidelite. Swing/slide doors shall be carrier suspended and shall have a steel corner support at the hinge stile. The sidelites shall have a glass jacking screw assembly Sliding doors shall MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS slide on the inside of the sidelights. Adjustable anti -riser stops shall be provided to prevent de- railing. Roller assemblies shall be constructed using 1 -3/4 inch diameter nylon wheels. Doors shall swing out 90 degrees when sliding door is in the full open position. Non adjustable magnetic latch shall provide release for emergency breakaway Sliding doors shall be provided with electric grounding against static electricity 5 tFinishes: All exposed surfaces shall be Class II clear anodized finish AA- M12C22A31 6 Hardware: Provide sliding doors with recessed pulls. Swinging sidelites to be provided with surface pulls on one side only Provide concealed floating pivots. 7 Glass and Glazing: Provide safety glazing materials that comply with ANSI Z97 1 and requirements of Section 08800, Glazing. 2.2 FABRICATION A. Except to the extent that more stringent requirements are indicated, provide aluminum sliding glass door units that have been fabricated by the manufacturer's standard methods and that comply with indicated standards. Include a complete system for assembly of components and anchorage of units. PART 3 EXECUTION 3.1 EXAMINATION A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work shall be construed as acceptance of conditions. B Inspect openings before beginning installation of sliding glass doors. Verify that the rough opening is correct and that sill plate is level. Do not proceed with installation of door units until unsatisfactory conditions have been corrected. 3.2 PREPARATION SECTION 08310 PAGE 4 ALUMINUM SLIDING GLASS DOORS C. Metal surfaces shall be dry clean, free of grease, oil, dirt, rust and corrosion, and welding slag without sharp edges or offsets at joints. A. Prepare substrates and connecting work to enable the best installation per industry standards of the work of this Section. B Provide sufficient removal of existing concrete slabs to enable proper installation of recessed tracks. Do not over -cut or chip concrete deeper than necessary to do installation. C Ensure that required depressions are provided at new floor slabs to enable proper installation of recessed tracks. 3.3 INSTALLATION A. Comply with manufacturer's instructions and recommendations for installation of door units, hardware, accessories, and other components. B Separate aluminum and other corrodible surfaces from sources of corrosion or electrolytic action at points of contact with other materials by complying with requirements specified under paragraph `Dissimilar Materials' in the Appendix of AAMA 101 C. Set units plumb, level, and true to line without warp or rack of frames and panels. Provide proper support and anchor frames and fixed panels securely in place. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS D Adjust operating panels, screens, and hardware to provide a tight fit at contact points. E. Apply hardware and adjust to achieve smooth and quiet operation. 3.4 FIELD QUALITY CONTROL A. Comply with Section 01400, Quality Control. B. Provide experienced supervision of all elements of the work of this Section. 3.5 CLEANING AND PROTECTION A. Comply with Section 01500 Construction Facilities and Temporary Controls, and Section 01710 Final Cleaning. B. Clean aluminum surfaces promptly after installation of units. Exercise care to avoid damage to protective coatings and finishes. Remove excess glazing and sealing compounds, dirt, and other substances. Lubricate hardware and the moving parts. C. Remove and replace glass which is broken, chipped, cracked, abraded, or damaged in other ways during the construction period, including natural causes, accidents, and vandalism. D Institute and maintain protection and other precautions required through remainder of construction period to ensure that, except for normal wear, sliding door units will be without damage or deterioration at the time of substantial completion. 3.6 SCHEDULE SECTION 08310 PAGE 5 ALUMINUM SLIDING GLASS DOORS A. Install sliding doors where shown on the project drawings, and as follows: 1 Provide Sliding Doors with Recessed Floor Track at Short Stay patient rooms. 2. Provide Sliding Doors Without Floor Tracks at Surgery Pre-Op Holding rooms. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 08310 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY i A. Provide materials, labor, equipment, inspection, coordination, and supervision necessary for the best and most complete installation of aluminum entrances as indicated in this specification and on the project drawings. B. Section includes: 1 Glazed aluminum swinging doors and door frames. C. Related work specified elsewhere includes: 1 Division 7 Section `Sealants' for joint sealers. 2. Division 8 Section Aluminum Windows' for aluminum window units. 3 Division 8 Section 'Glazing' for glass in doors and storefront. 4 Division 8 Section `Finish Hardware' for door hardware. 1.3 SYSTEM PERFORMANCE REQUIREMENTS SECTION 08410 PAGE 1 ALUMINUM ENTRANCES A, General. Provide aluminum entrance and storefront assemblies that comply with performance characteristics specified, as demonstrated by testing the manufacturer's corresponding stock assemblies according to test methods indicated. B. Thermal Movement: Design the aluminum entrance and storefront framing systems to provide for expansion and contraction of the component materials. Entrance doors shall function normally over the specified temperature range. 1 The system shall be capable of withstanding a metal surface temperature range of 180 deg. F (100 deg. C) without buckling, failure of joint seals, undue stress on structural elements, damaging loads on fasteners, reduction of performance, stress on glass, or other detrimental effects. C. Design Requirements: Provide aluminum entrance and storefront systems that comply with structural performance, air infiltration, and water penetration requirements indicated. 1 Wind Loads: Provide aluminum entrance and storefront assemblies capable of withstanding wind pressures per currently adopted edition of the UBC Consult Structural Drawings for applicable exposure and importance category D Structural Performance: Conduct tests for structural performance in accordance with ASTM E 330 At the conclusion of the tests there shall be no glass breakage or permanent damage to fasteners, anchors, hardware or actuating mechanism. Framing members shall have no permanent deformation in excess of 0.2 percent of their clear span. 1 Deflection Normal to the Plane of the Wall. Test pressure required to measure deflection of framing members normal to the plane of the wall shall be equivalent to the wind load MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 08410 PAGE 2 ALUMINUM ENTRANCES specified above. Deflection shall not exceed 1/360 of the clear span, when subjected to uniform load deflection test. 2. Deflection Parallel to the Plane of the Wall. Test pressures required to measure deflection parallel to the plane of the wall shall be equal to 1.5 times the wind pressures specified above. Deflection of any member carrying its full dead load shall not exceed an tamount that will reduce glass bite below 75 percent of the design dimension and shall not reduce the edge clearance between the member and the fixed panel, glass or other fixed member above to less than 1/8 inch. The clearance between the member and an operable door or window shall be at least 1/16 inch. E. Air Infiltration. Provide aluminum entrance and storefront framing system with an air infiltration rate of not more than .50 CFM per linear foot of perimeter crack for a single door, and not more than 1 0 CFM per lineal foot of perimeter crack for double doors, when tested in accordance with ASTM E 283 at an inward test pressure differential of 1.57 psf. F Water Penetration. Provide framing systems with no uncontrolled water penetration (excluding operable door edges) as defined in the test method when tested in accordance with ASTM E 331 at an inward test pressure differential of 6.24 lbs. per sq. ft. 1.4 SUBMITTALS A. General. Submit the following in accordance with Conditions of the Contract and Division 1 Specification Sections. 1 Product data for each aluminum entrance system required, including: a. Manufacturer's standard details and fabrication methods. b. Data on finishing, hardware and accessories. c. Recommendations for maintenance and cleaning of exterior surfaces. 2. Shop drawings for each aluminum entrance system required, including: a. Layout and installation details, including relationship to adjacent work. b Elevations at 1/2 -inch scale. c. Detail sections of typical composite members. d. Anchors and reinforcement. e. Hardware mounting heights. f. Provisions for expansion and contraction. g. Glazing details. 3 Hardware Schedule: Submit complete hardware schedule organized into sets based on hardware specified. Coordinate hardware with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish. Include item name, name of the manufacturer and complete designations of every item required for each door opening. 4 Test Reports: Provide certified test reports from a qualified independent testing laboratory showing that aluminum entrance and storefront systems have been tested in accordance with specified test procedures and comply with performance characteristics indicated. MAHLUM NORDFORS McK NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.5 QUALITY ASSURANCE SECTION 08410 PAGE 3 ALUMINUM ENTRANCES A. Installer Qualifications: Engage an experienced Installer who has completed installations of aluminum storefront and entrances similar in design and extent to those required for the project and whose work has resulted in construction with a record of successful in- service performance. B. Manufacturer's Qualifications: Provide aluminum entrances and storefront systems produced by a firm experienced in manufacturing systems that are similar to those indicated for this project and that have a record of successful in service performance. C. Single Source Responsibility Obtain aluminum entrance systems from one source and from a single manufacturer D Design Criteria: The drawings indicate the size, profile, and dimensional requirements of aluminum entrance work required and are based on the specific types and models indicated. Aluminum entrance by other manufacturers may be considered, provided deviations in dimensions and profiles are minor and do not change the design concept as judged by the Architect. The burden of proof of equality is on the proposer l 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver aluminum entrance components in the manufacturer's original protective packaging. B. Store aluminum components in a clean dry location away from uncured masonry or concrete. Cover components with waterproof paper, tarpaulin or polyethylene sheeting in a manner to permit circulation of air 1 Stack framing components in a manner that will prevent bending and avoid significant or permanent damage. 1.7 PROJECT CONDITIONS A. Field Measurements: Check openings by accurate field measurement before fabrication. Show recorded measurements on shop drawings. Coordinate fabrication schedule with construction progress to avoid delay of the work. 1 Where necessary proceed with fabrication without field measurements, and coordinate fabrication tolerances to ensure proper fit. 1.8 WARRANTY A. Warranty Submit a written warranty executed by the manufacturer, agreeing to repair or replace units that fail in materials or workmanship within the specified warranty period. Failures include, but are not necessarily limited to 1 Structural failures including excessive deflection, excessive leakage or air infiltration. 2. Faulty operation. 3 Deterioration of metals, metal finishes and other materials beyond normal weathering. B. Warranty Period. 3 years after the date of Substantial Completion. MAHLUM NORDFORS Mc}aNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. The warranty shall not deprive the Owner of other rights or remedies the Owner may have under other provisions of the Contract Documents, and is in addition to and runs concurrent with other warranties made by the Contractor under requirements of the Contract Documents. PART 2- PRODIJCTS 2.1 GENERAL A. Acceptable Manufacturers 1. Kawneer Company Inc. 2. U S. Aluminum Corporation 3 Others as approved by addenda SECTION 08410 PAGE 4 ALUMINUM ENTRANCES B. Quality Standard Product: Where product names are given, the design is based on the products indicated: 1 Aluminum Swing Doors: 350 Medium Stile Swing Door, 1 -3/4 inch nominal width, as manufactured by Kawneer Company Inc. 2.2 MATERIALS A. Aluminum Members: 6063-T5 alloy and temper recommended by the manufacturer for strength, corrosion resistance, and application of required finish; comply with ASTM B 221 for aluminum extrusions, ASTM B 209 for aluminum sheet or plate, and ASTM B 211 for aluminum bars, rods and wire. B. Carbon steel reinforcement of aluminum framing members shall comply with ASTM A 36 for structural shapes, plates and bars, ASTM A 611 for cold rolled sheet and strip, or ASTM A 570 for hot rolled sheet and strip. C. Glass and Glazing Materials: Comply with requirements of "Glass and Glazing" section of these specifications. D Fasteners: Provide fasteners of aluminum, nonmagnetic stainless steel, zinc plated steel, or other material warranted by the manufacturer to be noncorrosive and compatible with aluminum components, hardware, anchors and other components. 1 Reinforcement: Where fasteners screw -anchor into aluminum members less than 0 125 inches thick, reinforce the interior with aluminum or nonmagnetic stainless steel to receive screw threads, or provide standard noncorrosive pressed -in splined grommet nuts. 2. Exposed Fasteners: Do not use exposed fasteners except for application of hardware. For application of hardware, use Phillips flat -head machine screws that match the finish of member or hardware being fastened. E. Concealed Flashing: 0 0179 -inch (26 gage) minimum dead -soft stainless steel, or 0 026 -inch- thick minimum extruded aluminum of alloy and type selected by manufacturer for compatibility with other components. F Brackets and Reinforcements: Provide high strength aluminum brackets and reinforcements; where use of aluminum is not feasible provide nonmagnetic stainless steel or hot -dip galvanized steel complying with ASTM A 123 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS G. Concrete and Masonry Inserts: Provide cast iron, malleable iron, or hot -dip galvanized steel inserts complying with ASTM A 123 H. Compression Weatherstripping: Manufacturer's standard replaceable compressible weatherstripping gaskets of molded neoprene complying with ASTM D 2000 or molded PVC complying with ASTM D 2287 2.3 HARDWARE SECTION 08410 PAGE 5 ALUMINUM ENTRANCES A. General. Refer to Division 8 Section "Finish Hardware" for requirements for hardware items other than those indicated to be provided by the aluminum entrance manufacturer B. Provide heavy -duty hardware units as required for operation of each door, and as recommended by manufacturer for service required; finish to match door 2.4 COMPONENTS A. Stile- and -Rail Type Entrance Doors: Provide tubular frame members, fabricated with mechanical joints using heavy inserted reinforcing plates and concealed tie -rods or j- bolts. 1 Glazing: Fabricate doors to facilitate replacement of glass or panels, without disassembly of stiles and rails. Provide snap -on extruded aluminum glazing stops, with exterior stops anchored for nonremoval. a. Design. Provide 1 -3/4- inch -thick doors of design indicated, with medium stile (3- 1/2 -inch nominal width). 2.5 FABRICATION A. General. Fabricate aluminum entrance components to designs, sizes and thicknesses indicated and to comply with indicated standards. Sizes and profile requirements are indicated on the drawings. Variable dimensions are indicated, with maximum and minimum dimensions required, to achieve design requirements and coordination with other work. B Prefabrication. Complete fabrication, assembly finishing, hardware application, and other work to the greatest extent possible before shipment to the Project site. Disassemble components only as necessary for shipment and installation. 1 Perform fabrication operations, including cutting, fitting, forming, drilling and grinding of metal work to prevent damage to exposed finish surfaces. Complete these operations for hardware prior to application of finishes. 2. Do not drill and tap for surface- mounted hardware items until time of installation at project site. 3 Preglaze door units to greatest extent possible. C. Welding: Comply with AWS recommendations. Grind exposed welds smooth to remove weld spatter and welding oxides. Restore mechanical finish. 1 Welding behind finished surfaces shall be performed in such a manner as to minimize distortion and discoloration on the finished surface. D Reinforcing: Install reinforcing as required for hardware and as necessary for performance requirements, sag resistance and rigidity MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS E. Dissimilar Metals: Separate dissimilar metals with bituminous paint, or a suitable sealant, or a nonabsorptive plastic or elastomeric tape, or a gasket between the surfaces. Do not use coatings containing lead. F Continuity Maintain accurate relation of planes and angles with hairline fit of contacting members. G. Fasteners: Conceal fasteners wherever possible. H. Weatherstripping: For exterior doors, provide compression weatherstripping against fixed stops. At other edges, provide sliding weatherstripping retained in adjustable strip mortised into door edge. 1 Provide EPDM or vinyl -blade gasket weatherstripping in bottom door rail, adjustable for contact with threshold. 2.6 FINISHES A. General. Comply with NAAMM "Metal Finishes Manual" for recommendations relative to application and designations of finishes. B. Finish designations prefixed by "AA" conform to the system established by the Aluminum Association for designating aluminum finishes. C. Class II Clear Anodized Finish. AA- M12C22A31 (Mechanical Finish. as fabricated, nonspecular• Chemical Finish. etched, medium matte; Anodic Coating: Class II Architectural, clear film thicker than 0 4 mil). PART 3 EXECUTION 3.1 EXAMINATION SECTION 08410 PAGE 6 ALUMINUM ENTRANCES A. Examine substrates and supports, with the Installer present, for compliance with requirements indicated, installation tolerances, and other conditions that affect installation of aluminum entrances. Correct unsatisfactory conditions before proceeding with the installation. 1 Do not proceed with installation until unsatisfactory conditions are corrected. 3.2 INSTALLATION A. Comply with manufacturer's instructions and recommendations for installation. B. Set units plumb, level, and true to line, without warp or rack of framing members, doors, or panels. Install components in proper alignment and relation to established lines and grades indicated. Provide proper support and anchor securely in place. C. Construction Tolerances: Install aluminum entrance and storefront to comply with the following tolerances: 1 Variation from Plane: Do not exceed 1/8 inch in 12 feet of length or 1/4 inch in any total length. 2. Offset from Alignment: The maximum offset from true alignment between two identical members abutting end to end in line shall not exceed 1/16 inch. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 CLEANING SECTION 08410 PAGE 7 ALUMINUM ENTRANCES 3 Diagonal Measurements: The maximum difference in diagonal measurements shall not exceed 1/8 inch. 4 Offset at Comers: The maximum out -of -plane offset of framing at comers shall not exceed 1/32 inch. D Separate aluminum and other corrodible metal surfaces from sources of corrosion or electrolytic action at points of contact with other materials. 1 Zinc or cadmium plate steel anchors and other unexposed fasteners after fabrication. 2. Paint dissimilar metals where drainage from them passes over aluminum. 3 Paint aluminum surfaces in contact with mortar concrete or other masonry with alkali resistant coating. 4 Paint wood and similar absorptive material in contact with aluminum and exposed to the elements or otherwise subject to wetting, with two coats of aluminum house paint. Seal joints between the materials with sealant. E. Drill and tap frames and doors and apply surface mounted hardware items. Comply with hardware manufacturer's instructions and template requirements. Use concealed fasteners wherever possible. F Refer to "Glass and Glazing" Section of Division 8 for installation of glass and other panels indicated to be glazed into doors and framing, and not preglazed by manufacturer 3.3 ADJUSTING A. Adjust operating hardware to function properly for smooth operation without binding, and for weathertight closure. A. Clean the completed system, inside and out, promptly after installation, exercising care to avoid damage to coatings. B Clean glass surfaces after installation, complying with requirements contained in the "Glass and Glazing" Section for cleaning and maintenance. Remove excess glazing and sealant compounds, dirt and other substances from aluminum surfaces. 3.5 PROTECTION A. Institute protective measures required throughout the remainder of the construction period to ensure that aluminum entrances will be without damage or deterioration, other than normal weathering, at time of acceptance. 0 1997 Mahlum Nordfors McKinlcy Gordon END OF SECTION 08410 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDMONS ALTERATIONS SECTION 08520 PAGE 1 ALUMINUM WINDOWS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Provide materials, labor equipment, inspection, coordination, and supervision necessary for the best and most complete installation of aluminum windows as indicated in this specification and on the project drawings. B Section includes: 1 Aluminum window framing system C. Related work specified elsewhere includes: 1 Division 7 Section `Sealants' for joint sealers. 2. Division 8 Section Aluminum Entrances' for aluminum entry doors. 3 Division 8 Section 'Glazing' for glass in doors and storefront. 1.3 SYSTEM PERFORMANCE REQUIREMENTS A. General. Provide aluminum window assemblies that comply with performance characteristics specified, as demonstrated by testing the manufacturer's corresponding stock assemblies according to test methods indicated. B Thermal Movement: Design the aluminum window framing systems to provide for expansion and contraction of the component materials. 1 The system shall be capable of withstanding a metal surface temperature range of 180 deg. F (100 deg. C) without buckling, failure of joint seals, undue stress on structural elements, damaging loads on fasteners, reduction of performance, stress on glass, or other detrimental effects. C. Design Requirements: Provide aluminum window systems that comply with structural performance, air infiltration, and water penetration requirements indicated. 1 Wind Loads: Provide aluminum window assemblies capable of withstanding wind pressures per currently adopted edition of the UBC. Consult Structural Drawings for applicable exposure and importance category D Structural Performance: Conduct tests for structural performance in accordance with ASTM E 330 At the conclusion of the tests there shall be no glass breakage or permanent damage to fasteners, anchors, hardware or actuating mechanism. Framing members shall have no permanent deformation in excess of 0.2 percent of their clear span. 1 Deflection Normal to the Plane of the Wall. Test pressure required to measure deflection of framing members normal to the plane of the wall shall be equivalent to the wind load specified above. Deflection shall not exceed 1/360 of the clear span, when subjected to uniform load deflection test. MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 08520 PAGE 2 ALUMINUM WINDOWS 2. Deflection Parallel to the Plane of the Wall. Test pressures required to measure deflection parallel to the plane of the wall shall be equal to 1.5 times the wind pressures specified above. Deflection of any member carrying its full dead load shall not exceed an amount that will reduce glass bite below 75 percent of the design dimension and shall not reduce the edge clearance between the member and the fixed panel, glass or other Fixed member above to less than 1/8 inch. E. Air Infiltration. Provide aluminum window framing system with an air infiltration rate of not more than 0 06 CFM per sq. ft. of fixed area when tested in accordance with ASTM E 283 at an inward test pressure differential of 1.57 psf. F Water Penetration. Provide framing systems with no uncontrolled water penetration as defined in the test method when tested in accordance with ASTM E 331 at an inward test pressure differential of 6.24 lbs. per sq. ft. G. Condensation Resistance: Where framing systems are "thermal- break' construction, provide units tested for thermal performance in accordance with AAMA 1503 showing condensation resistance factor (CRF) of not less than 45 H. Thermal Transmittance: Provide framing systems that have an overall U-value of not more than 0 65 BTU /(hr x sq. ft. x deg. F) at 15 mph exterior wind velocity when tested in accordance with AAMA 1503 1.4 SUBMITTALS A. General. Submit the following in accordance with Conditions of the Contract and Division 1 Specification Sections. 1 Product data for each aluminum window system required, including: a. Manufacturer's standard details and fabrication methods. b. Data on finishing and accessories. c. Recommendations for maintenance and cleaning of exterior surfaces. 2. Shop drawings for each aluminum window system required, including: a. Layout and installation details, including relationship to adjacent work. b. Elevations at 1/4 -inch scale. c. Detail sections of typical composite members. d. Anchors and reinforcement. f Provisions for expansion and contraction. g. Glazing details. 3 Test Reports: Provide certified test reports from a qualified independent testing laboratory showing that aluminum window systems have been tested in accordance with specified test procedures and comply with performance characteristics indicated. 1.5 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has completed installations of aluminum windows similar in design and extent to those required for the project and whose work has resulted' in construction with a record of successful in- service performance. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS B. Manufacturer's Qualifications: Provide aluminum window systems produced by a firm experienced in manufacturing systems that are similar to those indicated for this project and that have a record of successful in- service performance. C. Single Source Responsibility. Obtain aluminum window systems from one source and from a single manufacturer D Design Criteria: The drawings indicate the size, profile, and dimensional requirements of aluminum window work required and are based on the specific types and models indicated. Aluminum windows by other manufacturers may be considered, provided deviations in dimensions and profiles are minor and do not change the design concept as judged by the Architect. The burden of proof of equality is on the proposer. 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver aluminum window components in the manufacturer's original protective packaging. B. Store aluminum components in a clean dry location away from uncured masonry or concrete. Cover components with waterproof paper, tarpaulin or polyethylene sheeting in a manner to permit circulation of air 1 Stack framing components in a manner that will prevent bending and avoid significant or permanent damage. 1.7 PROJECT CONDITIONS A. Field Measurements: Check openings by accurate field measurement before fabrication. Show recorded measurements on shop drawings. Coordinate fabrication schedule with construction progress to avoid delay of the work. 1 Where necessary proceed with fabrication without field measurements, and coordinate fabrication tolerances to ensure proper fit. 1.8 WARRANTY A. Warranty Submit a written warranty executed by the manufacturer, agreeing to repair or replace units that fail in materials or workmanship within the specified warranty period. Failures include, but are not necessarily limited to. 1 Structural failures including excessive deflection, excessive leakage or air infiltration. 2. Deterioration of metals, metal finishes and other materials beyond normal weathering. B. Warranty Period. 3 years after the date of Substantial Completion. C. The warranty shall not deprive the Owner of other rights or remedies the Owner may have under other provisions of the Contract Documents, and is in addition to and runs concurrent with other warranties made by the Contractor under requirements of the Contract Documents. PART 2 PRODUCTS 2.1 GENERAL A. Acceptable Manufacturers 1. Kawneer Company Inc. SECTION 08520 PAGE 3 ALUMINUM WINDOWS MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2. U S. Aluminum Corporation 3 Others as approved by addenda 2.2 MATERIALS SECTION 08520 PAGE 4 ALUMINUM WINDOWS B. Quality Standard Product: Where product names are given, the design is based on the products indicated: 1 'Aluminum Window Framing System. Tri-Fab II 451, 4 -1/2 inch nominal width, with a 1 -1/4 inch interior sill extension at perimeter framing, as manufactured by Kawneer Company Inc. A. Aluminum Members: Alloy and temper recommended by the manufacturer for strength, corrosion resistance, and application of required finish; comply with ASTM B 221 for aluminum extrusions, ASTM B 209 for aluminum sheet or plate, and ASTM B 211 for aluminum bars, rods and wire. B. Carbon steel reinforcement of aluminum framing members shall comply with ASTM A 36 for structural shapes, plates and bars, ASTM A 611 for cold rolled sheet and strip, or ASTM A 570 for hot rolled sheet and strip. C. Glass and Glazing Materials: Comply with requirements of "Glass and Glazing" section of these specifications. D Fasteners: Provide fasteners of aluminum, nonmagnetic stainless steel, zinc plated steel, or other material warranted by the manufacturer to be noncorrosive and compatible with aluminum components, hardware, anchors and other components. 1 Reinforcement"Where fasteners screw -anchor into aluminum members less than 0 125 inches thick, reinforce the interior with aluminum or nonmagnetic stainless steel to receive screw threads, or provide standard noncorrosive pressed -in splined grommet nuts. 2. Exposed Fasteners: Do not use exposed fasteners. E. Concealed Flashing: 0 0179 -inch (26 gage) minimum dead -soft stainless steel, or 0 026 -inch- thick minimum extruded aluminum of alloy and type selected by manufacturer for compatibility with other components. F Brackets and Reinforcements: Provide high strength aluminum brackets and reinforcements; where use of aluminum is not feasible provide nonmagnetic stainless steel or hot-clip galvanized steel complying with ASTM A 123 G. Concrete and Masonry Inserts: Provide cast iron, malleable iron, or hot-dip galvanized steel inserts complying with ASTM A 123 H. Compression Weatherstripping Manufacturer's standard replaceable compressible weatherstripping gaskets of molded neoprene complying with ASTM D 2000 or molded PVC complying with ASTM D 2287 I. Receptor Channel. Aluminum channels matching window components, sized to receive window heads. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.3 COMPONENTS A. Window Framing System. Provide window framing systems fabricated from extruded aluminum members of size and profile indicated. Include subframes and other reinforcing members of the type indicated. Provide for flush glazing window from the exterior on all sides. Shop fabricate and preassemble frame components where possible. Provide window frame iections without exposed seams. 1. Mullion Configurations: Provide pockets at the inside glazing face to receive resilient elastomeric glazing. Mullions and horizontals shall be one piece. Make provisions to drain moisture accumulation to the exterior 2.4 FABRICATION SECTION 08520 PAGE 5 ALUMINUM WINDOWS A. General. Fabricate aluminum window components to designs, sizes and thicknesses indicated and to comply with indicated standards. Sizes and profile requirements are indicated on the drawings. Variable dimensions are indicated, with maximum and minimum dimensions required, to achieve design requirements and coordination with other work. B. Prefabrication. Complete fabrication, assembly finishing, hardware application, and other work to the greatest extent possible before shipment to the Project site. Disassemble components only as necessary for shipment and installation. 1 Perform fabrication operations, including cutting, fitting, forming, drilling and grinding of metal work to prevent damage to exposed finish surfaces. Complete these operations for hardware prior to application of finishes. C. Welding: Comply with AWS recommendations. Grind exposed welds smooth to remove weld spatter and welding oxides. Restore mechanical finish. 1 Welding behind finished surfaces shall be performed in such a manner as to minimize distortion and discoloration on the finished surface. D Reinforcing: Install reinforcing necessary for performance requirements, sag resistance and rigidity E. Dissimilar Metals: Separate dissimilar metals with bituminous paint, or a suitable sealant, or a nonabsorptive plastic or elastomeric tape, or a gasket between the surfaces. Do not use coatings containing lead. F Continuity Maintain accurate relation of planes and angles with hairline fit of contacting members. G. Fasteners: Conceal fasteners wherever possible. 2.5 FINISHES A. General. Comply with NAAMM "Metal Finishes Manual" for recommendations relative to application and designations of finishes. B. Finish designations prefixed by "AA" conform to the system established by the Aluminum Association for designating aluminum finishes. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAINISURGERY ADDITIONS ALTERATIONS C. Class II Clear Anodized Finish. AA- M12C22A31 (Mechanical Finish. as fabricated, nonspecular Chemical Finish. etched, medium matte; Anodic Coating: Class II Architectural, clear film thicker than 0 4 mil). PART 3- EXECIJTION 3.1 EXAMINATION A. Examine existing aluminum window framing systems in adjacent construction to confirm perfect match of work in this contract. Notify Architect of any discrepancy between work in this contract and existing work. B. Examine substrates and supports, with the Installer present, for compliance with requirements indicated, installation tolerances, and other conditions that affect installation of aluminum windows. Correct unsatisfactory conditions before proceeding with the installation. 1. Do not proceed with installation until unsatisfactory conditions are corrected. 3.2 INSTALLATION A. Comply with manufacturer's instructions and recommendations for installation. B Set units plumb, level, and true to line, without warp or rack of framing members. Install components in proper alignment and relation to established lines and grades indicated. Provide proper support and anchor securely in place. C Construction Tolerances: Install aluminum window to comply with the following tolerances: 1 Variation from Plane: Do not exceed 1/8 inch in 12 feet of length or 1/4 inch in any total length. 2. Offset from Alignment: The maximum offset from true alignment between two identical members abutting end to end in line shall not exceed 1/16 inch. 3 Diagonal Measurements: The maximum difference in diagonal measurements shall not exceed 1/8 inch. 4 Offset at Corners: The maximum out -of -plane offset of framing at corners shall not exceed 1/32 inch. SECTION 08520 PAGE 6 ALUMINUM WINDOWS D Separate aluminum and other corrodible metal surfaces from sources of corrosion or electrolytic action at points of contact with other materials. 1 Zinc or cadmium plate steel anchors and other unexposed fasteners after fabrication. 2. Paint dissimilar metals where drainage from them passes over aluminum. 3 Paint aluminum surfaces in contact with mortar, concrete or other masonry with alkali resistant coating. 4 Paint wood and similar absorptive material in contact with aluminum and exposed to the elements or otherwise subject to wetting, with two coats of aluminum house paint. Seal joints between the materials with sealant. E. Set sill members and other members in bed of sealant as indicated, or with joint fillers or gaskets as indicated to provide weathertight construction. Comply with requirements of Division 7 for sealants, fillers, and gaskets. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 08520 PAGE 7 ALUMINUM WINDOWS F Refer to "Glass and Glazing" Section of Division 8 for installation of glass and other panels indicated to be glazed into doors and framing, and not preglazed by manufacturer. G. Provide receptor channels at head of windows to allow for structural deflection. 3.3 CLEANING A. Clean the completed system, inside and out, promptly after installation, exercising care to avoid damage to coatings. B. Clean glass surfaces after installation, complying with requirements contained in the "Glass and Glazing" Section for cleaning and maintenance. Remove excess glazing and sealant compounds, dirt and other substances from aluminum surfaces. 3.4 PROTECTION A. Institute protective measures required throughout the remainder of the construction period to ensure that aluminum entrances and storefronts will be without damage or deterioration, other than normal weathering, at time of acceptance. 0 1997 Mahlurn Nordfors McKinley Gordon END OF SECTION 08410 MAHI UM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.2 SUMMARY SECTION 08710 PAGE 1 DOOR HARDWARE 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification Sections, apply to this Section. A. This Section includes items known commercially as finish or door hardware that are required for swing, sliding, and folding doors, except special types of unique hardware specified in the same sections as the door frames on which they are installed. B. This Section does not include hardware for the following: 1. Cabinet hardware 2. Adjustable shelving 3 Existing doors 4 Temporary doors C. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 8 Section "Standard Steel Doors and Frames" for silencers integral with hollow metal frames. 2. Division 8 Section "Flush Wood Doors" for factory prefitting and factory premachining of doors for door hardware. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification sections. B. Product data including manufacturers' technical product data for each item of door hardware, installation instructions, maintenance of operating parts and finish, and other information necessary to show compliance with requirements. C. Final hardware schedule coordinated with doors, frames, and related work to ensure proper size, thickness, hand, function, and finish of door hardware. 1" Submit five reproducible copies of schedule on 8 -1/2 -inch by 11 -inch sheets numbered consecutively Furnish cover sheet listing name of project as shown on the Contract Documents, name of Owner, name of Architect, name of Contractor, name of hardware consultant, and date of submittal or revision of submittal. Furnish a vertical listing of the hardware items used followed by manufacturer's name either on cover sheet or immediately following the cover sheet (i.e. "hinges manufacturer's name Schedule hardware items for each door separately in typed vertical form; list each door in numerical order under a separate heading using door number in Door Opening Schedule; do not group doors with like or similar hardware under a single heading. Show hardware symbols in margin opposite each item of hardware and describe each piece of hardware with specified manufacturer's numbers or their equivalents as approved for each item. Schedules to include photo copies of each item listed. Architect will review the schedule and will return one copy to the Contractor with his comments. Resubmit only corrected copies of those sheets requiring correction and update all distributed copies with corrected sheets. Hardware schedules not complying with the above will not be reviewed and will be returned for proper formatting. A copy MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS SECTION 08710 PAGE 2 DOOR HARDWARE of an acceptable format will be available from the Architect upon request. Hardware schedules will not be reviewed by the Architect until they have been reviewed and approved by the Contractor 2. The approved Finish Hardware schedule shall be kept current throughout the project. All hardware changes and/or revisions shall be submitted in the specified format for insertion in the proper location in the approved Finish Hardware Schedule. A new title page shall accompany the new sheet(s) with a revision date. Each new page shall be marked "revised" or "REV" and the date of the revision noted. 3 The following is an example of the required format of the final hardware schedule: Heading 26 Sgl Door #41 Exterior from Boiler Room 14 3'0" x 7'0" x 1 -3/4 WD x HMF LHR 1 -1/2 pair butts (B5) Stanley FBB 191- 26D -4 -1/2 x 4 -1/2 NRP 1 lockset (L -21) Schlage D8OPD- PLY -26D 1 door closer (C-4) LCN 4114 aluminum 1 kickplate (K -2) BBW No. 37 US32D 10 x 34 inches 1 wall bumper (S -1) BBW WB5OX US26D 1 threshold (T -1) Pemko 179A x 36 inches MS ES Hardware schedules prepared in a coded horizontal manner are not acceptable. 4 Submittal Sequence: Submit final schedule at earliest possible date, particularly where acceptance of hardware schedule must precede fabrication of other work that is critical in the Project construction schedule. Include with schedule the product data, samples, shop drawings of other work affected by door hardware, and other information essential to the coordinated review of schedule. 5 Keying Schedule: Upon receipt of approved hardware schedule, arrange an interview with the Owner through the Architect to obtain necessary keying information. Submit three copies of keying schedule indicating door numbers in numerical sequence, lock or cylinder number and its particular keying. Obtain approval from Owner before proceeding. D Samples to be submitted only upon request. Submit one sample of each type of exposed hardware unit in finish indicated and tagged with full description for coordination with schedule. Submit samples prior to submission of final hardware schedule. 1 Samples will be returned to the supplier Units that are acceptable and remain undamaged through submittal, review and field comparison process may after final check of operation, be incorporated in the Work, within limitations of keying coordination requirements. E. Templates for doors, frames, and other work specified to be factory prepared for the installation of door hardware. Check shop drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements. 1.4 QUALITY ASSURANCE A. Single Source Responsibility Obtain each type of hardware (latch and lock sets, hinges, closers, etc.) from a single manufacturer B. Supplier Qualifications: A recognized architectural door hardware supplier, with warehousing facilities in the Project's vicinity that has a record of successful in- service performance for supplying door hardware similar in quantity type, and quality to that indicated for this Project and that employs an experienced MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS C. Fire Rated Openings: Provide door hardware for fire rated openings that complies with NFPA Standard no. 80 and requirements of authorities having jurisdiction. Provide only items of door hardware that are listed and are identical to products tested by UL, Warnock Hersey FM, or other testing and inspecting organization acceptable to authorities having jurisdiction for use on types and sizes of doors indicated in compliance with requirements of fire-rated door and door frame labels. Provide coordinators, astragals, and self latching bolts, door closers and smoke seals if required to meet the Standard. D Certificates: After installation of all hardware, but before acceptance of the work, furnish certification from hardware supplier that hardware is installed and operating in a satisfactory manner and hardware provided is as listed on the approved finish hardware submittal. Include one updated copy of the hardware schedule, listing hardware installed. Submit in writing addressed to the Owner in care of the Architect. E. Manual. At time of acceptance of the Work, deliver a complete set of all templates, instruction sheets, one updated hardware schedule, installation details and similar data in a clearly identified 3 -ring binder to the owner, in care of the Architect. F Warranty The hardware supplier shall provide to the Owner, written warranties from the manufacturers of locksets, exit devices for three years and door closers for a ten -year period. Pneumatic or electric closers are warranted for a two -year period. Warranties are to be included in the above manual. G. Inspection Service: After installation of all hardware, but before acceptance of the work, arrange to have the hardware supplier inspect the installation of the hardware. Supplier to advise the Contractor in writing of any hardware that requires reinstallation for proper operation, with a copy to the Architect. 1.5 PRODUCT HANDLING A. Tag each item or package separately with identification related to final hardware schedule, and include basic installation instructions with each item or package. B Packaging of door hardware is responsibility of supplier As material is received by hardware supplier from various manufacturers, sort and repackage in containers clearly marked with appropriate hardware set number to match set numbers of approved hardware schedule. Two or more identical sets may be packed in same container C. Inventory door hardware jointly with representatives of hardware supplier and hardware installer until each is satisfied that count is correct. D Deliver individually packaged door hardware items promptly to place of installation (shop or Project site). E. Provide secure lock -up for door hardware delivered to the Project, but not yet installed. Control handling and installation of hardware items that are not immediately replaceable so that completion of the Work will not be delayed by hardware losses both before and after installation. 1.6 KEYING SECTION 08710 PAGE 3 DOOR HARDWARE architectural hardware consultant (AHC) who is available to Owner, Architect, and Contractor, at reasonable times during the course of the Work, for consultation. 1 Supplier to meet with Owner to finalize keying requirements and to obtain final instructions in writing. A. Provide 6 -pin key interchangeable core type cylinders for all locks or scheduled items requiring cylinders for proper operation. Key to the existing KABBA (level four) grand master key system and otherwise key as later directed. Furnish change keys stamped "Do Not Duplicate" on one side only When the term 'cyl MK to job" occurs in this section, it shall mean a cylinder keyed to the project which meets the requirements of this paragraph. Provide voucher lips for Owner as required. MAHLUM NORDFORS MCK NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS B. Construction Keying: During Construction, provide locks keyed to a construction master key system (allow for 15 cylinders with keys); maintain all locks operative for access and exit by construction keys. At time so completion, the hardware supplier shall convert the construction keying system to the building keying system under the supervision of the Owner's representative and illustrating the lock's function and key operation. All construction cylinders and keys are to be returned to the hardware supplier. C. Keys: Provide three keys to each lock unless otherwise required by the approved keying schedule. After conversion to the building key system, adjust locks for proper key operation. File keys in individual envelopes furnished by lock manufacturer and mark each with door number, key number, and master key set to facilitate their integration into a key control system. Deliver all change keys to Owner Send all master keys and core control keys by registered mail directly from the manufacturer to the Owner (as later directed). PART 2- PRODIJCTS 2.1 MANUFACTURERS AND SUBSTITUTIONS A. Architectural hardware of equivalent design, size, type, finish, and function to that specified, but produced by the manufacturers listed below will be accepted by the Architect. As Specified Acceptable Substitutions Hinges Stanley McKinney Hager Geared hinges Pemko Roton Locks Schlage None Lock cylinders KABBA None Door Closers LCN None Exit Devices Sargent None Door Pulls, Push Plates Trimco Tice, Quality Signature Brass Kickplates Trimco Tice, Quality Signature Brass Wall or Floor Stops Trimco Quality Signature Brass Overhead Stops Glynn Johnson Rixson, Arch. Builders Hardware Automatic Bolts Door Controls Glynn Johnson, Ives Coordinators Door Controls Glynn Johnson, Ives Thresholds Pemko National Guard Products Door Seals Pemko National Guard Products Continuous Hinges Markar None Automatic door operators Keane Monroe None Bathroom interlocks Security Door Controls None 2.2 HARDWARE MATERIALS AND FABRICATION SECTION 08710 PAGE 4 DOOR HARDWARE A. Furnish screws for installation with each hardware item. Provide Phillips flat headed screws, except as otherwise indicated. Furnish exposed screws to match the hardware finish. B Provide fasteners which are compatible with both the unit fastened and substrate and which will not cause corrosion or deterioration of hardware, base material, or fastener MAHLUM NORDFORS MCIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS SECTION 08710 PAGE 5 DOOR HARDWARE 2.3 HARDWARE FINISHES Unless specifically indicated otherwise, provide all architectural hardware in the following finishes: A. The finish of hardware in general shall be dull chrome, US26D B. Exit devices, push plates, door pulls and kickplates shall be dull stainless steel, US32D C. Door closer are to be painted aluminum. 2.4 BUTTS Types required are listed as B1, B2, etc. in the hardware schedule and described under "B" below A. Provide non removable pins NRP) for all exterior doors. B. Width of butts shall be as required to clear projecting trim or structural conditions to obtain maximum degree of opening. C. Furnish one pair butts for doors 60 inches or less in height. D Furnish 1 -1/2 pair butts for doors from 61 inches to 90 inches in height. E. Furnish one extra butt for every 30 inches exceeding 90 inches in height. B Factory Number Size B1 179 4.5 x 4.5 B2 BB 179 4.5 x 4.5 B3 BB168 4.5 x 4.5 B4 BB 168 5 x 4.5 B5 BB199 -32D 4.5 x 4.5 B6 BB 199 -32D 5 x 4.5 B7 CFM —HD* Geared hinges B8 HG -315 x EG -308 x EG -T 308 Continuous hinges B9 HG -311 x EG -308* Continuous hinge B 10 HG -300 Continuous hinge Cut for lock front, strike and bolts where required. 2.5 LOCKSETS Types are listed as L1, L2, etc. in the hardware schedule and described under "L" below A. Furnish all lever handle locks in Rhodes design, 2 -3/4" BS. All lever operated locks used on fire rated openings are to have UL approved fire stop inside the lock case or trim. B Provide tactile or knurling on knobs, levers, or exit device touch bars where the symbol "K" occurs in the lock column of the hardware schedule. C. Provide curved lip strikes of minimum projection to protect door trim. Provide flat, flush lip strikes for pairs of doors with overlapping astragals. D Provide all locks and deadlocks with wrought strike boxes. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS E. Install devices on mineral core doors with sex nuts and bolts. Provide shim plates if required for doors with projecting glass frames. F Removable mullions: provide angle adapters for top plate where required for installation on narrow frame headers. "L" L 1 Latchset D 1 OS Rhodes L2 Privacy Latch D4OS Rhodes L3 Office Lock D53RD Rhodes Kabba cylinder L4 Classroom Lock D7ORD Rhodes Kabba cylinder L5 Storeroom Lock D8ORD Rhodes Kabba cylinder L6 Dormitory lock L9456L 06A Kabba cylinder L7 Storeroom lock D8ORD Rhodes x flush strike Kabba cylinder 945 Automatic flush bolts 80 Floor strike Coordinator 600 series x 2/601 L8 Digital lock Kabba cylinder Kabba cylinder L9 Exit devices (2) 12 -8710 L10 All hardware by door manufacturer L11 Latchset D 1 OS Rhodes Power supply 631RF -CR Magnetic lock 1585 -DPS Inside activation switch CB401A Outside emergency switch CB401B install at 72" from floor L12 Latchset D10S Rhodes Magnetic lock 1585 -DPS Outside emergency switch CB401B install at 72" from floor L13 Push plate 1001 -11 RC Door pull 1195 -1 Flush bolts 3917 12" Floor strike 3910 SECTION 08710 PAGE DOOR HARDWARE Alarm Lock DL2700IC 26D MAHLUM NORDFORS MCIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS C. D E. F G. L14 L15 L16 L17 L18 L19 2.6 DOOR CLOSERS Types required are listed as C1 All electrical hold -open closers Factory Number Cl 4041 C2 4041 -EDA C3 4041 -S -CNS C4 404141 C5 4041 -H -CNS C6 4041 -DEL C7 4041 -EDA -DEL Push plate Arm pull Push plate Door pull Exit device Exit device Kabba cylinders (3). Door pulls Exit latch Magnetic switch Door decal Door pulls Push bars Push plates L20 Exit device (in -door) Exit device (out -door) Power transfers (2) SECTION 08710 PAGE 7 DOOR HARDWARE 1001 -9 1135 1001 -9 1195 -1 16 -8413 x 113 16 -8410 1191 -3 with N fasteners D25D Rhodes MS764 24volt `EMERGENCY EXIT ONLY ALARM WILL SOUND 1191 -3 with N fasteners 1163 1001 7" x 20" 12 56 -8710 12 -56 -8713 x 313 x MAL -DT MP -EPT -1024 C2, etc. in the hardware scheduled and described under "C" below A. Arms will permit maximum degree of opening permitted by wall conditions. B Furnish all parallel arm closers with heavy duty arms and spacer blocks for fifth screw installation; furnish spacer shims if required to clear glass frames; furnish thick hub shoe for adjustable should seal clearance. Furnish sex nuts and bolts for application to all wood doors. Furnish closers with key valves for independent speed, latching, and back checking adjustments. Furnish drop plates for doors with insufficient top rails to cover sight of closers from opposite side of door and when used in conjunction with regular arm closer and overhead concealed stop application. Closers shall be applied to both leaves of a pair of doors. shall have concealed wiring (verify voltage required). Description Regular Arm Parallel Arm Parallel Ann with Stop Feature Regular Arm with hold -open Parallel Arm with stop and hold -open Regular Arm with delayed action Parallel Arm with delayed action MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS NCI Factory Number C8 4041 -S -CNS -DEL C9 4021 x 4020 -18 C10 4040 -SE C11 Automatic door operator see paragraph 2.12 2.7 KICKPLATES S7 GJ -900SE -32D Series S8 GJ- 902S- 32D -95 degree 2.9 THRESHOLDS SECTION 08710 PAGE 8 DOOR HARDWARE Descriation Parallel arm with stop, delayed action Top jamb closer and bracket Electric hold -open Types required are listed as K1, K2, etc. in the hardware scheduled and described under "K" below' A. Provide kickplates on push side of doors and mop plates on pull side of doors where specified. Symbol 2/K2 indicates kickplates to be installed on each side of each door B. Provide kickplates to both leaves on pairs of doors. C. Provide stainless steel Phillips oval/undercut head, full- thread type sheet metal screws for fastening not more than 5 inches on center D Kickplates to be 050 thick and beveled four sides and with a flat matte finish. E. Kickplates to be 2 inches and mop plates 1 inch less than door width. "K" Factory Number Description K1 K0050 4 inches high K2 K0050 10 inches high K3 K0050 38 inches high 2.8 DOOR STOPS AND HOLDERS Types are listed as Si, S2, etc. in the hardware schedule described under "S" below A. Furnish overhead stop or holders with maximum degree of opening that job conditions permit. B Furnish floor stops type S2 where obstructions or wall conditions prevent the use of wall stops. C. Furnish toggle bolts or machine screws and tampins as required. Plastic or fibre anchors will not be accepted. D Furnish snap -in type door silencers for all wood or metal frames except where weatherstripping or smoke gasketing is specified. Factory Number S1 1274CS Series S2 1215 Series S3 1260WP with 10" Pipe S4 GJ- 100S -32D Series S5 GJ-410S-32D Series S6 LCN -SEM -7850 24VDC Description Convex Wall Stop Floor Stop Pipe Stop and Holder Concealed Overhead Stop Heavy Duty Concealed Overhead Stop Regular Duty Electro- magnetic Wall Mounted Door Holders Surface Overhead Stop, Heavy Duty Surface Overhead Stop, Heavy Duty Types are listed as T1, T2, etc. in the hardware schedule and described under "T" below "T" Factory Number Description T1 272A 1/4" x 6" flat MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS 2.10 WEATHER STRIP AND GASKET Types required are listed as WI, W2, etc. in the hardware schedule and described under "W" below Factory Number Description W1 588D Silicone Smoke Gasket W2 290AS Weatherstrip W3 31NCN Door Sweep W4 355CS Astragal W5 303AS Astragal Strips (2) W6 346C Rain drip W7 357SS Flat bar astragal Include all screws and fastening as required for installation. 2.11 OWNER'S SPARE HARDWARE Provide the following miscellaneous items which are to be delivered direct to the: 2.12 AUTOMATIC DOOR OPERATORS AND RELATED EQUIPMENT Doors C 104B 1 Each Automatic Operator 2148 -CL 2 Each Activation Switches 212266 -SS Operation. Either activation switch operates both doors. Doors C104A 1 Each Automatic Operator 2148 -CL 2 Each Activation Switches 212266 -SS 2 Each Exit device Modifications ACSI 1550 1 Each Magnetic Lock ACSI 3711 (for in -door) 1 Each Power Supply ACSI 1405 -04 -AO- Special 1 Each Key Switch ACSI 1310 -2 x Kabba cylinder Operation. SECTION 08710 PAGE 9 DOOR HARDWARE Daytime Turn on 1310 2. Vertical rod exit devices go to maintained retraction; magnetic lock unlocked; either activation switch operates both doors. If fire alarm is activated, exit devices go to locked position and magnetic lock stays unlocked. Night time Turn off 1310 -2. Exit devices go to locked position; magnetic lock is locked; both activation switches are deactivated. If fire alarm goes off, magnetic lock is unlocked. Manual entry by use of key in cylinder of exit device on outswing door 2.13 HARDWARE SCHEDULE Door Butts Locks Closers KickPl Stops Thresh W -Strip BOO1A. .B2 L4 C3 W1 BOOIB .B2 L4 C3 WI B002 C1 MAHLUM NORDFORS MCKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS SECTION 08710 PAGE 10 DOOR HARDWARE Door Butts Locks Closers KickPl Stops Thresh W -Strip B006 Cl B007 C3 B013 .B2 L2 C3 K2 B014 .B5 L6 C2. S3 W1 B014A. .B4 3 L6 C3 WI B015 .B2 L5 C3 W1 B015A. .B2 L5 C2. Si W1 B016 .B2 L5 -K C1 Si W1 B017 Existing no change T001 Reuse existing hardware T002 Reuse existing hardware COO1A. .B8 L9 C2. S6 WI CS002 CI PT001 C1 SS102 .B2 L3 Si SS103 .B2 L2 C1 S1 SS116 L10 SS117A .B2 L2 S5 SS117B .B2 L2 S5 SS118 L10 SS119 L10 SS120A .B2 L2 S5 SS120B .B2 L2 S5 SS121 L10 SS122A .B9 L13 C4 S1 SS122B .B9 L13 C5 SI SS123 .89 L14 C6 Si SS125 .B9 L14 C7 S1 SS126 .B9 L14 C8. SS127 .B2 L15 C5 SS128 .B2 L1 Si SS129 .B2 L2 Si SS130 L10 SS131A .B2 L2 SS131B .B2 L2 S5 SS132 L10 S5 SS154 .B2 L1 Si SS155 .B2 L4 S1 R201 .B5 L5 C5 C124 .B7 L16 C9 S101 .Existing no change S102 Existing no change S103 .Existing no change S104 .Existing no change S105 Existing no change S106 .B2 L1 Si S107 .B2 L4 C2. S6 S108 .B2 L15 Cl S1 S109 .B2 L2 S5 S110 .B2 L2 S1 W 1 W 1 W1 W2,3,6 WI 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS SECTION 08710 PAGE 11 DOOR HARDWARE Door Butts Locks Closers KickP1 Stops Thresh W -Strip S111A .B2 L8 C1. Si WI S111B .B2 L15 Cl. S1 S112A .B2 L8 C1. S1 W1 S112B .B2 L15 Cl. S1 S113 .152 L2 Si S114 .B2 L2 S5 S115 .B2 L15 C1 Si S116 .B2 L2 Si S117A .B9 Ll C10 S7 W1 S117B .B9 L1 C7 S2 W1 S117C .B2 L17 C2. Si W1 S118 .B9 L1 Si S119 .B2 L1 Si S120 .B2 L5 C1 Si W1 S121 .B2 L3 S1 S122 .B2 L15 C1. S5 S125A .B9 L13 C5 S8 S125B .B9 L14 C4 Si S127A .B9 L13 C5 S8 S127B .B9 L14 C4 S1 S128A .B9 L13 C5 S8 S128B .B9 L14 C4 Si S130 Existing no change S131 Existing no cnange S132A .B9 L13 C5 S8 S132B .B9 L14 C4 Si S133A .B9 L13 C4 S1,8 S133B .B9 L14 C4 Si S134A .B2 L4 S1 S136 .B9 L1 C2. S6 W1 S137 .B9 L8 C4 Si S137 .BS138 B2 L8. S1 S139 .B2 L8 Si 5140 L10 S141A .B2 L11 SI S141B .B2 L12 Si S142 L10 S143A .B9 L14 C4 Si S143B .B9 L14 C4 S1 S145 .B9 L13 C5 S1 C101 .B8 L9 C2. S6 W1 C102A. .B7 L16 C9 S4 T1 W3 C102B .B7 L18 C9 S4 C104A. .B10 L20 C11 K3 Si W1,7 C104B .B10 L19 C11 K3 S1 C107 .Existing no change NW102. .B2 L8 Si W1 NW105 .B2 L2 S5 NW 106 .B2 L3 C10 S7 WI NM201 .B7 L1 Si W1 NM202 .B2 L2 S1 MAHLUM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS SECTION 08710 PAGE 12 DOOR HARDWARE Door Butts Locks Closers KickP1 Stops Thresh W -Strip NM203 .B7 Ll Si W1 NM204 .B2 L2 Si NM205 .B7 L1 S1 W1 NM206 .B2 L2 S1 NM207 .B7 L1 Si W1 NM208 .B2 L2 Si NM209 .B7 Ll S1 W1 NM210 .B2 L2 Si NM211 .B7 L1 Si W1 NM212 .B2 L2 Si NM213 Existing no change NM214 .B2 L2 S5 NM215 Existing no change NM216 Existing no change NM217 Existing no change NM218 Existing no change NM219 Existing no change NM220 Existing no change NM221 Existing no change NM222 .B2 L2 S5 NM223 L10 NM225 .B2 L8 Cl S1 W1 NM226A .B2 L8 Cl Si W1 NM226B .B2 L8 Cl S1 W1 NM227 .B2 L2 Cl S 1 W1 NM229 .B2 L8 C1 Si W1 NM23 .B2 L5 C6. Si W1 NM234 .B2 L5 Cl Si W1 NM235 .B2 L2 Cl S1 W1 NM236A .B9 L8 C7 Si W1 NM236B .B9 L8 C7 S1 WI NM237A .B9 L8 C7 Si WI NM237B .B9 L8 C7 Si W1 NM238 .B7 L7 C3 W1,4 NM242A .B9 L8 C7 Si W1 NM242B .B9 L8 C7 S1 W1 NM243A .B9 L5 C7 Si W1 NM243B .B9 L5 C7 Si W1 NM244 .B2 L2 S5 NM245 .B7 L1 Si W1 NM246 .B2 L2 S5 NM247 .B7 L1 S1 W1 NM248 .B2 L2 S5 NM249 .B7 L1 S1 W1 NM250 .B2 L2 S5 NM251 .B7 L1 S1 W1 NM252 .B2 L2 S5 NM253 .B7 Ll S1 WI NM254 .B2 L2 S5 NM255 .B7 L1 Si W1 NM256 .B2 L2 S5 NM257 .B7 L1 Si W1 NM258 .B2 L2 S5 MAHLUM NORDFORS MCIINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS PART 3- EXECUTION 3.1 INSTALLATION SECTION 08710 PAGE 13 DOOR HARDWARE Door Butts Locks Closers KickPl Stops Thresh W -Strip NM259 .B7 L1 S1 Wl NM260 .B2 L2 S5 NM261 .B7 Ll Si WI NM262 .B2 L2 S5 NM263 JP Ll Si WI NM237 .B2 L5 C6. Si WI NW238. .B2 L1 C1 Si WI NM246 Existing no change NM247 Existing no change NM248 Existing no change NM249 Existing no change NM250 Existing no change NM260 .B2 L3 Cl. Si Wl NM263 .B2 L1 Cl S1 Wl NM265A .B9 L8 C7 Si WI NM265B .B9 L8 C7 S1 WI NM267A .B9 L8 C7 S1 WI NM267B .B9 L8 C7 S1 W1 C201 .B8 L9 C2. S6 WI A. In the absence of a hardware installation requirement in another section of this specification, the following recommendations shall be used as a guide. All other hardware shall be installed as recommended by the manufacturer 1 Top Hinge: 5 inches, header rabbet to top of hinge 2. Bottom Hinge: 10 inches, finish floor to bottom of hinge 3 Center Hinge: centered between top and bottom hinges 4 Mortise Locks: 40 -5/16 inches, finish floor to center of lock case and strike 5 Cylindrical Locks: 38 inches, finish floor to center of lock case and strike 6 Deadlocks and Deadlatches: as directed 7 Exit Devices: 37 inches, finish floor to center of cross bar (including mortise lock type devices) 8 Push Plates: 45 inches, finish floor to center of plate 9 Door Pulls: 42 inches, finish floor to center of pull 10 Hospital Latch or Roller Latch. 45 inches, finish floor to center of hatch 11 Magnetic Door Holders: wall mounted magnetic door holders are to be installed 6 inches down from the top of the door and 6 inches in from the lock edge of the door B Install each hardware item in compliance with the manufacturer's instructions and recommendations. Where cutting and fitting is required to install hardware onto or into surfaces that are later to be painted or finished in another way coordinate removal, storage and reinstallation or application of surface protection with finishing work specified in the Division 9 Sections. Do not install surface mounted items until finishes have been completed on the substrates involved. C. Set units level, plumb, and true to line and location. Adjust and reinforce the attachment substrate as necessary for proper installation and operation. MAHLUM NORDFORS MCKI LEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN SURGERY ADDITIONS ALTERATIONS SECTION 08710 PAGE 14 DOOR HARDWARE D Drill and countersink units that are not factory prepared for anchorage fasteners. Space-fasteners and anchors in accordance with industry standards. E. Set thresholds for exterior doors in full bed of butyl rubber or polyisobutylene mastic sealant complying with requirements specified in Division 7 Section "Joint Sealers." F Weatherstripping' and Seals: Comply with manufacturer's instructions and recommendations to the extent installation requirements are not otherwise indicated. G. Existing Doors and Frames: 1 Prepare existing doors and frames to receive new hardware as specified. Hollow metal doors and frames are to be cut, reinforced and welded as required. Remaining holes where existing hardware is removed are to be filled and ground smooth. Wood doors and frames are to be blocked and remachined as required. Fill and sand any voids, cracks or gouges as required for refinishing. 2. It will be the responsibility of the Contractor and the door and/or frame manufacturer to coordinate this work to ensure the matching of the door to the frame. 3.2 ADJUSTING, CLEANING, AND DEMONSTRATING A. Adjust and check each operating item of hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate freely and smoothly or as intended for the application made. 1 Where door hardware is installed more than one month prior to acceptance or occupancy of a space or area, return to the installation during the week prior to acceptance or occupancy and make final check and adjustment of all hardware items in such space or area. Clean operating items as necessary to restore proper function and finish of hardware and doors. Adjust door control devices to compensate for final operation of heating and ventilating equipment. 2. Closers: After installation, closers shall be adjusted to control the doorswing and latch the door After the air handling system has been balanced, arrange to have the closer manufacturer's representative make the final adjustment of all closers on the job Closer adjustment shall not exceed the following opening force: a. Interior doors 5 pounds pressure b. Exterior doors 8.5 pounds pressure c. Fire doors: pressure as required to ensure doors will be closed and latched at the time of fire. B. Clean adjacent surfaces soiled by hardware installation. C Instruct Owner's personnel in the proper adjustment and maintenance of door hardware and hardware finishes. D Six-Month Adjustment: Approximately six months after the date of Substantial Completion, the Installer accompanied by representatives of the manufacturers of latchsets and locksets, and of door control devices, and of other major hardware suppliers, shall return to the Project to perform the following work: 1 Examine and readjust each item of door hardware as necessary to restore function of doors and hardware to comply with specified requirements. 2. Consult with and instruct Owner's personnel in recommended additions to the maintenance procedures. 3 Replace hardware items that have deteriorated or failed due to faulty design, materials, or installation of hardware units. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN 1 SURGERY ADDITIONS ALTERATIONS SECTION 08710 PAGE 15 DOOR HARDWARE E. Product Handling: Provide secure lockup for hardware delivered to the project but not yet installed. Control the handling and installation of hardware items which are not inunediately replaceable so that the completion of the work will not be delayed by hardware losses, both before and after the installation. ©Mahlmn Nordfors McKinley Gordon 1997 END OF SECTION 08710 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 08800 PAGE 1 GLAZING A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes glazing for the following products, including those specified in other Sections where glazing requirements are specified by reference to this Section. 1. Window units. 2. Vision lights in doors. 3 Interior relites, including vision control glazing units. 1.3 DEFINITIONS A. Manufacturer is used in this Section to refer to a firm that produces primary glass or fabricated glass as defined in the referenced glazing standard. B. Deterioration of Coated Glass: Defects developed from normal use that are attributed to the manufacturing process and not to causes other than glass breakage and practices for maintaining and cleaning coated glass contrary to manufacturer's directions. Defects include peeling, cracking, and other indications of deterioration in metallic coating. C. Deterioration of Laminated Glass: Defects developed from normal use that are attributed to the manufacturing process and not to glass breakage and practices for maintaining and cleaning laminated glass contrary to manufacturer's directions. Defects include edge separation, delamination materially obstructing vision through glass, and blemishes exceeding those allowed by referenced laminated glass standard. D Deterioration of Insulating Glass: Failure of the hermetic seal under normal use due to causes other than glass breakage and improper practices for maintaining, and cleaning insulating glass. Evidence of failure is the obstruction of vision by dust, moisture, or film on the interior surfaces of glass. Improper practices for maintaining and cleaning glass do not comply with the manufacturer's directions. 1.4 SYSTEM PERFORMANCE REQUIREMENTS A. General. Provide glazing systems that are produced, fabricated, and installed to withstand normal thermal movement, wind loading, and impact loading (where applicable), without failure including loss or glass breakage attributable to the following: defective manufacture, fabrication, and installation; failure of sealants or gaskets to remain watertight and airtight; deterioration of glazing materials; and other defects in construction. B. Glass Design. Glass thicknesses indicated on Drawings are for detailing only Confirm glass thicknesses by analyzing Project loads and in- service condition Provide glass lights for the various size openings in the thicknesses and strengths (annealed or heat treated) to meet or exceed the following criteria. 1 Minimum glass thickness, nominally of lights in exterior walls is 0.23 inch. 2. Tinted and heat absorbing glass thicknesses for each tint indicated are the same throughout Project. MAHLUM NORDFORS McIC NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.5 SUBMITTALS 1.6 QUALITY ASSURANCE SECTION 08800 PAGE 2 GLAZING 3 Minimum glass thicknesses of lights, whether composed of annealed or heat treated glass, are selected so the worst -case probability of failure does not exceed the following: a. 8 lights per 1000 for lights set vertically or not over 15 degrees off vertical and under wind action. Determine minimum thickness of monolithic annealed glass according to ASTM E 1300 For other than monolithic annealed glass, determine thickness per glass manufacturer's standard method of analysis including applying adjustment factors to ASTM E 1300 based on type of glass. C. Normal thermal movement results from the following maximum change (range) in ambient and surface temperatures acting on glass-framing members and glazing components. Base engineering calculation on materials' actual surface temperatures due to both solar heat gain and nighttime sky heat loss. 1. Temperature Change (Range) 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. A. General. Submit the following according to Conditions of Contract and Division 1 Specification Sections. B. Product data for each glass product and glazing material indicated. C. Samples for verification purposes of 12- inch square samples of each type of glass indicated except for clear monolithic glass products, and 12 -inch -long samples of each color required (except black) for each type of sealant or gasket exposed to view Install sealant or gasket sample between two strips of material representative in color of the adjoining framing system. D Product certificates signed by glazing materials manufacturers certifying that their products comply with specified requirements. 1 Separate certifications are not required for glazing materials bearing manufacturer's permanent labels designating type and thickness of glass, provided labels represent a quality control program of a recognized certification agency or independent testing agency acceptable to authorities having jurisdiction. E. Maintenance data for glass and other glazing materials to be included in Operating and Maintenance Manual specified in Division 1 A. Glazing Publications: Comply with published recommendations of glass product manufacturers and organizations below except where more stringent requirements are indicated. Refer to these publications for glazing terms not otherwise defined in this Section or in referenced standards. 1 FGMA Publications: "FGMA Glazing Manual." 2. LSGA Publications: "LSGA Design Guide." 3 SIGMA Publications: TM -3000 "Vertical Glazing Guidelines" B. Safety Glass: Products complying with ANSI Z97 1 and testing requirements of 16 CFR Part 1201 for Category II materials. 1 Subject to compliance with requirements, provide safety glass permanently marked with certification label of Safety Glazing Certification Council (SGCC) or other certification agency acceptable to authorities having jurisdiction. 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Fire Resistive Glazing Products for Door Assemblies: Products identical to those tested per ASTM E 152, labeled and listed by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. D Insulating Glass Certification Program. Provide insulating glass units permanently marked either on spacers or at least one component light of units with appropriate certification label of inspecting and testing agency indicated below 1 Insulating Glass Certification Council (IGCC). 2. Associated Laboratories, Inc. (ALI). 3 National Certified Testing Laboratories (NCTL). E. Glazier Qualifications: Engage an experienced glazier who has completed glazing similar in material, design, and extent to that indicated for Project with a record of successful in- service performance. F Single -Source Responsibility for Glass: Obtain glass from one source for each product indicated below 1 Primary glass of each (ASTM C 1036) type and class indicated. 2. Insulating glass of each construction indicated. 3 Heat treated glass of each (ASTM C 1048) condition indicated. G. Single -Source Responsibility for Glazing Accessories: Obtain glazing accessories from one source for each product and installation method indicated. 1.7 DELIVERY STORAGE, AND HANDLING 1.8 PROJECT CONDITIONS 1.9 WARRANTY SECTION 08800 PAGE 3 GLAZING A. Protect glazing materials to comply with manufacturer's directions and as needed to prevent damage to glass and glazing materials from condensation, temperature changes, direct exposure to sun, or other causes. A. Environmental Conditions: Do not proceed with glazing when ambient and substrate temperature conditions are outside the limits permitted by glazing materials manufacturer or when glazing channel substrates are wet from rain, frost, condensation, or other causes. A. General. Warranties specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents. B. Manufacturer's Warranty on Insulating Glass: Submit written warranty signed by manufacturer of insulating glass agreeing to furnish replacements for insulating glass units that deteriorate as defined in "Definitions" article, f.o.b. point of manufacture, freight allowed Project site, within specified warranty period indicated below Warranty covers only deterioration due to normal conditions of use and not to handling, installing, protecting, and maintaining practices contrary to glass manufacturer's published instructions. 1 Warranty Period: Manufacturer's standard but not less than 10 years after date of Substantial Completion. MAHLUM NORDFORS McIUNLEY GORDON SECTION 08800 PAGE 4 OLYMPIC MEMORIAL HOSPITAL GLAZING 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Manufacturer's Warranty on Vision Control Glazing Unit: Submit written warranty signed by manufacturer of vision control glazing unit agreeing to furnish replacements for vision control glazing units that develop material obstruction of vision as a result of dust or film formation on the internal glass surface caused by failure of the hermetic seal, f.o.b. point of manufacture, freight allowed Project site, within specified warranty period indicated below Warranty covers only dgterioration due to normal conditions of use and not to handling, installing, protecting, and maintaining practices contrary to glass manufacturer's published instructions. 1 Warranty Period: Manufacturer's standard but not less than 5 years after date of Substantial Completion. PART 2- PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated in the Work include, but are not limited to, the following: 1. Ford Glass Division 2. Guardian Industries Corp. 3 LOF Glass, Inc. 4 PPG Industries, Inc. 2.2 PRIMARY FLOAT GLASS PRODUCTS A. Float Glass: ASTM C 1036, Type I (transparent glass, flat), Class as indicated below and Quality q3 (glazing select). 1 Class 1 (clear) unless otherwise indicated. B Refer to requirements for sealed insulating glass units for performance characteristics of assembled units composed of tinted glass, coated or uncoated, relative to visible light transmittance, U- values, shading coefficient, and visible reflectance. 2.3 HEAT TREATED FLOAT GLASS A. Uncoated, Clear, Heat Treated Float Glass: ASTM C 1048, Condition A (uncoated surfaces), Type I (transparent glass, flat), Class 1 (clear), Quality q3 (glazing select), kind as indicated below 1. Kind FT (fully tempered) where indicated. B. Manufacturers: Subject to compliance with requirements, provide heat treated glass by one of the following companies. 1 AFG Industries, Inc. 2. Guardian Industries Corp. 3 PPG Industries, Inc. 4 Tempglass. 5 Viracon, Inc. 2.7 WIRED GLASS A. Wired Glass: ASTM C 1036, Type II (patterned and wired glass, flat), Class 1 (clear), Quality q8 (glazing); 6 mm (0.23 inch) thick; of form and mesh pattern indicated below. 1 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.4 INSULATING GLASS PRODUCTS 2.4 VISION CONTROL GLAZING UNITS SECTION 08800 PAGE 5 GLAZING 1. Polished Wired Glass: Form 1 (wired, polished both sides), and as follows: a. Mesh m2 (square). B. Available Manufacturers: Subject to compliance with requirements, manufacturers offering wired glass products that may be incorporated in the Work include, but are not limited to, the following companies. 1. Polished Wired Glass: a. Ashai Glass Co. b. Central Glass Co. Ltd. c. Nippon Sheet Glass Ltd. d. Pilkington Sales (North America) Ltd. A. Sealed Insulating Glass Units: Preassembled units consisting of organically sealed lights of glass separated by dehydrated air spaces complying with ASTM E 774 and with other requirements indicated, including those in Insulating Glass Product Data Sheet at the end of this Section. 1 For properties of individual glass lights making up units, refer to requirements specified elsewhere in this Section applicable to types, classes, kinds, and conditions of glass products comprising lights of insulating glass units. 2. Provide heat treated, coated float glass of kind indicated or, if not otherwise indicated, Kind HS (heat strengthened) where recommended by manufacturer to comply with system performance requirements specified and Kind FT (fully tempered) where safety glass is designated or required. 3 U- values are expressed as Btu/hour x sq. ft. x deg F A. Sealed Insulating Glass Units with Integrated Pivoting Louvers: Preassembled units consisting of organically sealed lights of glass separated by 2 inch dehydrated air space. 1 Both glass lites to be 1/4 inch heat treated float glass, kind FT (fully tempered.) 2. Louvers to be 1 -3/8 inch extruded aluminum, hollow chambered profile, alloy 6063 -T5 color as selected by Architect from manufacturer's standard selection. Louvers to be secured at both ends with molded pivots and shall operate without cords and strings. Louver slats shall be controlled by a manual crank handle. B. Approved Manufactures: Provide vision control glazing units by one of the following: 1. Vision Control Products, manufactured by Unicel, 88 de Vaudreull, Boucherville, Quebec, Canada J4B 5G4 (800) 668 -1580 2. Others as approved by addendum. 2.5 ELASTOMERIC GLAZING SEALANTS A. General. Provide products of type indicated, complying with the following requirements: 1 Compatibility Select glazing sealants and tapes of proven compatibility with other materials they will contact, including glass products, seals of insulating glass units, and glazing channel substrates, under conditions of installation and service, as demonstrated by testing and field experience. MAHLUM NORDFORS McK NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2. Suitability Comply with sealant and glass manufacturer's recommendations for selecting glazing sealants and tapes that are suitable for applications indicated and conditions existing at time of installation. 3 Colors: Provide color of exposed joint sealants to comply with the following: a. Provide selections made by Architect from manufacturer's full range of standard colors for products of type indicated. B. Elastomeric Glazing Sealant Standard: Provide manufacturer's standard chemically curing, elastomeric sealants of base polymer indicated that comply with ASTM C 920 requirements, including those referencing ASTM classifications for Type, Grade, Class and Uses. C. Glazing Sealant: Use for all wet glazing, except as otherwise specified: 1. `999 Glazing Sealant' by Dow Corning Corp. 2. `Silglaze N2501 Sealant' or `Gesil N2600 Sealant' by General Electrical Co. 3 `Rhodorsil 5C' by Rone Poulenc Inc. Princeton, NJ NOTE. Backup material shall be compatible with sealant. 2.6 MISCELLANEOUS GLAZING MATERIALS SECTION 08800 PAGE 6 GLAZING D Closed Cell Foam Tape: Continuous extruded expanded foam neoprene with a Shore A durometer hardness and profile adequate to fulfill the overall performance requirements specified and complying with ASTM C509 Type II. Provide adhesive on one side. E. Butyl Glazing Tape Reinforced. A preformed, nonsagging, nonoxidizing, nonstaining butyl rubber tape with core reinforcement, one of the following: 1. Tremco 440' by Tremco Mfg Co. 2. 'Extru-Seal B-44' by Pecora Chemical Corp. 3 `DAP Butyl Rubber Tape' by DAP Inc. A. General. Provide products of material, size, and shape complying with referenced glazing standard, requirements of manufacturers of glass and other glazing materials involved for glazing application indicated, and with a proven record of compatibility with surfaces contacted in installation. B. Cleaners, Primers and Sealers: Type recommended by sealant or gasket manufacturer C. Setting Blocks: Elastomeric material with a Shore A durometer hardness of 85 plus or minus 5 D Spacers: Elastomeric blocks or continuous extrusions with a Shore A durometer hardness required by glass manufacturer to maintain glass lights in place for installation indicated. E. Edge Blocks: Elastomeric material of hardness needed to limit glass lateral movement (side walking). 2.7 FABRICATION OF GLASS AND OTHER GLAZING PRODUCTS A. Fabricate glass and other glazing products in sizes required to glaze openings indicated for Project, with edge and face clearances, edge and surface conditions, and bite complying with recommendations of product manufacturer and referenced glazing standard as required to comply with system performance requirements. 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 3- EXECUTION 3.1 EXAMINATION A. Examine glass framing, with glazier present, for compliance with the following: 1 Manufacturing and installation tolerances, including those for size, squareness, offsets at corners. 2. Presence and functioning of weep system. 3 Minimum required face or edge clearances. 4 Effective sealing between joints of glass- framing members. B. Do not proceed with glazing until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Clean glazing channels and other framing members receiving glass immediately before glazing. Remove coatings that are not firmly bonded to substrates. 3.3 GLAZING, GENERAL SECTION 08800 PAGE 7 GLAZING A. Comply with combined recommendations of manufacturers of glass, sealants, gaskets, and other glazing materials, except where more stringent requirements are indicated, including those in referenced glazing publications. B. Glazing channel dimensions as indicated on Drawings provide necessary bite on glass, minimum edge and face clearances, and adequate sealant thicknesses, with reasonable tolerances. Adjust as required by Project conditions during installation. C. Protect glass from edge damage during handling and installation as follows: 1 Use a rolling block in rotating glass units to prevent damage to glass corners. Do not impact glass with metal framing. Use suction cups to shift glass units within openings; do not raise or drift glass with a pry bar Rotate glass lites with flares or bevels on bottom horizontal edges so edges are located at top of opening, unless otherwise indicated by manufacturer's label. 2. Remove damaged glass from Project site and legally dispose of off site. Damaged glass is glass with edge damage or other imperfections that, when installed, weaken glass and impair performance and appearance. D Apply primers to joint surfaces where required for adhesion of sealants, as determined by preconstruction sealant substrate testing. E. Install elastomeric setting blocks in sill rabbets, sized and located to comply with referenced glazing standard, unless otherwise required by glass manufacturer. Set blocks in thin course of compatible sealant suitable for heel bead. F Do not exceed edge pressures stipulated by glass manufacturers for installing glass lites. G. Provide spacers for glass sizes larger than 50 united inches (length plus height) as follows: 1 Locate spacers inside, outside, and directly opposite each other. Install correct size and spacing to preserve required face clearances, except where gaskets and glazing tapes are used that have demonstrated ability to maintain required face clearances and comply with system performance requirements. MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 08800 PAGE 8 GLAZING 2. Provide 1/8 -inch minimum bite of spacers on glass and use thickness equal to sealant width. With glazing tape, use thickness slightly less than final compressed thickness of tape. H. Provide edge blocking to comply with requirements of referenced glazing publications, unless otherwise required by glass manufacturer. I. Set glass lites in each series with uniform pattern, draw bow and similar characteristics. 3.4 TAPE GLAZING A. Position tapes on fixed stops so that when compressed by glass their exposed edges are flush with or protrude slightly above sightline of stops. B. Install tapes continuously but not in one continuous length. Do not stretch tapes to make them fit opening. C. Where framing joints are vertical, cover these joints by applying tapes to heads and sills first and then to jambs. Where flaming joints are horizontal, cover these joints by applying tapes to jambs and then to heads and sills. Place joints in tapes at corners of opening with adjoining lengths butted together, not lapped. Seal joints in tapes with compatible sealant approved by tape manufacturer E. Do not remove release paper from tape until just before each lite is installed. F Center glass lites in openings on setting blocks and press firmly against tape by inserting dense compression gaskets formed and installed to lock in place against faces of removable stops. Start gasket applications at corners and work toward centers of openings. 3.6 SEALANT GLAZING (WET) A. Install continuous spacers between glass lites and glazing stops to maintain glass face clearances and to prevent sealant from extruding into glass channel weep systems until sealants cure. Secure spacers in place and in position to control depth of installed sealant relative to edge clearance for optimum sealant performance. B. Force sealants into glazing channels to eliminate voids and to ensure complete wetting or bond of sealant to glass and channel surfaces. C. Tool exposed surfaces of sealants to provide a substantial wash away from glass. Install pressurized gaskets to protrude slightly out of channel to eliminate dirt and moisture pockets. 3.8 PROTECTION AND CLEANING A. Protect exterior glass from breakage immediately after installation by attaching crossed streamers to framing held away from glass. Do not apply markers to glass surface. Remove nonpermanent labels, and clean surfaces. B. Protect glass from contact with contaminating substances resulting from construction operations including weld splatter If, despite such protection, contaminating substances do come into contact with glass, remove them immediately as recommended by glass manufacturer C. Examine glass surfaces adjacent to or below exterior concrete and other masonry surfaces at i frequent intervals during construction, but not less than once a month, for build -up of dirt, scum, alkali deposits, or stains, and remove as recommended by glass manufacturer 1 1 1 1 1 1 1 1 1 e 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 08800 PAGE 9 GLAZING D Remove and replace glass that is broken, chipped, cracked, abraded, or damaged in any way including natural causes, accidents and vandalism, during construction period. E. Wash glass on both faces in each area of Project not more than 4 days prior to date scheduled for inspections that establish date of Substantial Completion. Wash glass as recommended by Vass manufacturer 3.6 SCHEDULE A. Extent of Work 1. Provide glass and glazing throughout openings at windows, relights, sidelights, transoms, doorlights, vision panels, and other openings intended for or requiring glass. 2. Provide types of glass and glazing as scheduled herein and indicated on the drawings. 3 Where in conflict with this schedule, provide the work that is the most expensive. B. At Interior Doors and Sidelights 1 At nonlabeled door openings, provide tempered glass throughout. 2. At labeled door openings, provide clear wire glass throughout. C. Relights and Transoms 1. Provide clear float glass throughout, 1/4 inch thick, with exceptions as noted below 2. Provide tempered glass throughout for relights meeting any of the following criteria: a. Opening with a vertical edge within 24 inches of a door opening and the bottom edge below 60 inches. b. Opening with the bottom edge less than 18 inches from a floor and the glass is larger than 9 square feet or walking surface within 36 inches of the glass unit. c. As required for strength. d. As recommended by the glass manufacturer D Insulated Glass: Provide factory installed insulated glazing units at all vertical exterior windows. E. Vision Control Glazing: Provide vision control glazing units at operating room windows as indicated on drawings. F Where Glass is Shown on Drawings: Provide as shown except provide per this schedule in event of conflict. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PRIMARY CLEAR FLOAT GLASS DATA Class: Class 1 (clear) Thickness: 1/4 inch Visible Light Transmittance: 89% Visible Light Reflectance: 8% Shading Coefficient: 0.94 Solar Heat Gain Coefficient: 0.81 Quality Standard Product: PPG Clear Glass SECTION 08800 PAGE 10 GLAZING 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON SECTION 08800 PAGE 11 OLYMPIC MEMORIAL HOSPITAL GLAZING 2 MAIN/SURGERY ADDITIONS ALTERATIONS INSULATING GLASS DATA SHEET Classification of Units: Thickness: Air Space Width. Gas Filling Sealing System: Spacer Specifications: Thickness of each light: Uncoated Clear Indoor Light: Uncoated Clear Outdoor Light: Visible Light Transmittance: Visible Light Reflectance: Summer Daytime U- Value: Winter Nighttime U- Value: Shading Coefficient: Class C, CB, or CBA 1 inch 1/2 inch Fill air space with Argon Manufacturer's standard sealants Manufacturer's standard 1/4 inch Kind HS (heat strengthened), Conditiona 1 (clear), float glass. Kind HS (heat strengthened), Conditiona 1 (clear), float glass. 80% 15% 0.56 0 49 0.82 A (uncoated), Class A (uncoated), Class MAHLUM NORDFORS McKINLEY GORDON SECTION 08800 PAGE 12 OLYMPIC MEMORIAL HOSPITAL GLAZING 2 MAIN /SURGERY ADDITIONS ALTERATIONS VISION CONTROL GLASS DATA SHEET Thickness: Air Space Width. Sealing System. Spacer Specifications: Thickness of each light: Uncoated Clear Inside Light: Uncoated Clear Outside Light: Louver Direction. Control. 0 1997 Mahlum Nordfors McKinley Gordon 2 -1/2 inch 2 inch Manufacturer's standard sealants Manufacturer's standard 1/4 inch Kind FT (fully tempered), Conditiona A (clear), float glass. Kind FT (fully tempered), Conditiona A (clear), float glass. Vertical Manual crank or knob (uncoated), Class 1 (uncoated), Class 1 END OF SECTION 08800 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 09255 PAGE 1 GYPSUM BOARD ASSEMBLIES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Non -load- bearing steel framing members for gypsum board assemblies. 2. Gypsum board assemblies attached to steel framing 3 Grouting of hollow metal door frames. 4 Acoustic insulation. 5 Acoustic sealant. B. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 7 Section "Firestopping and Smokestopping" for firestopping systems and fire resistive -rated joint sealants. 2. Division 9 Section "Painting" for substrate curing requirements. 3 Division 9 Section "Wall Coverings" for vinyl wallcovering substrate requirements. 1.3 DEFINITIONS A. Gypsum Board Construction Terminology* Refer to ASTM C 11 and GA -505 for definitions of terms related to gypsum board assemblies not defined in this Section or in other referenced standards. 1.4 ASSEMBLY PERFORMANCE REQUIREMENTS A. Sound Transmission Characteristics: For gypsum board assemblies indicated to have STC ratings, provide materials and construction identical to those of assemblies whose STC ratings were determined per ASTM E 90 and classified per ASTM E 413 by a qualified independent testing agency 1.5 SUBMITTALS A. General. Submit the following according to Conditions of the Contract and Division 1 Specification Sections. B. Product data for each type of product specified. 1.6 QUALITY ASSURANCE A. Fire-Test-Response Characteristics: Where fire -rated gypsum board assemblies are indicated, provide materials and construction identical to those of assemblies tested for fire resistance per ASTM E 119 by an independent testing and inspecting agency acceptable to authorities having jurisdiction. 1 Fire Resistance Ratings: As indicated by reference to GA File Numbers in GA-600 "Fire Resistance Design Manual" or to design designations in UL "Fire Resistance Directory" MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS SECTION 09255 PAGE 2 GYPSUM BOARD ASSEMBLIES or in the listing of another testing and inspecting agency acceptable to authorities having jurisdiction. B. Single -Source Responsibility for Steel Framing Obtain steel framing members for gypsum board assemblies from a single manufacturer C. Single-Source Responsibility for Panel Products: Obtain each type of gypsum board and other panel products from a single manufacturer D Single -Source Responsibility for Finishing Materials: Obtain finishing materials from either the same manufacturer that supplies gypsum board and other panel products or from a manufacturer acceptable to gypsum board manufacturer. E. Conform to the following standards: 1. ASTM C 754 for installation of steel framing. 2. ASTM C 840 for application and finishing of gypsum board F Conform to quality standards of the Northwest Wall and Ceiling Bureau, 1032 NE 65th, Seattle, WA 98115 (206) 524 -4243• 1.7 DELIVERY, STORAGE, AND HANDLING A. Deliver materials in original packages, containers, or bundles bearing brand name and identification of manufacturer or supplier. B. Store materials inside under cover and keep them dry and protected against damage from weather, direct sunlight, surface contamination, corrosion, construction traffic, and other causes. Neatly stack gypsum panels flat to prevent sagging. C. Handle gypsum board to prevent damage to edges, ends, and surfaces. Do not bend or otherwise damage metal comer beads and trim. 1.8 PROJECT CONDITIONS A. Environmental Conditions, General. Establish and maintain environmental conditions for applying and finishing gypsum board to comply with ASTM C 840 and with gypsum board manufacturer's recommendations. B Room Temperatures: For non adhesive attachment of gypsum board to framing, maintain not less than 40 deg F (4 deg C). For adhesive attachment and finishing of gypsum board, maintain not less than 50 deg F (10 deg C) for 48 hours prior to application and continuously after until dry Do not exceed 95 deg F (35 deg C) when using temporary heat sources. C. Ventilation. Ventilate building spaces, as required, for drying joint treatment materials. Avoid drafts during hot dry weather to prevent finishing materials from drying too rapidly PART 2- PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1 Steel Framing and Furring: a. Angeles, Co. MAHLUM NORDFORS McIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS b. Consolidated Systems, Inc. c. Dale Industries, Inc. d. Fire Trak Corp. e. Knorr, Inc. f. Marino Industries Corp. g. Gold Bond Building Products Div National Gypsum Co. h. Unimast Inc. i. Western Steel Framing, Inc. 2. Grid Suspension Assemblies: a Chicago Metallic Corp. b. National Rolling Mills Co. c. USG Interiors, Inc. 3 Gypsum Board and Related Products: a. Domtar Gypsum. b. Georgia Pacific Corp. c. Gold Bond Building Products Div National Gypsum Co. d. United States Gypsum Co. 4 Acoustic Insulation. a. Celotex b. Owens- Coming Fiberglas Corp. SECTION 09255 PAGE 3 GYPSUM BOARD ASSEMBLIES 2.2 STEEL FRAMING COMPONENTS FOR SUSPENDED AND FURRED CEILINGS A. General. Provide components of sizes indicated but not less than that required to comply with ASTM C 754 for conditions indicated. B. Wire for Hangers and Ties: ASTM A 641, Class 1 zinc coating, soft temper C. Hanger Rods: Mild steel and zinc- coated or protected with rust inhibitive paint. D Flat Hangers: Mild steel and zinc coated or protected with rust- inhibitive paint. E. Channels: Cold -rolled steel, 0 05980- inch minimum thickness of base (uncoated) metal and 7/16- inch -wide flanges, and as follows: 1 Carrying Channels: 1 -1/2 inch deep, 475 lbs per 1000 feet, unless otherwise indicated. 2. Furring Channels: 3/4 inch deep, 300 LB per 1000 feet, unless otherwise indicated. 3 Finish: Rust inhibitive paint, unless otherwise indicated. 4 Finish. G-60 hot -dip galvanized coating per ASTM A 525 for framing in shower rooms and where indicated. F Steel Studs for Furring Channels: ASTM C 645 with flange edges bent back 90 deg and doubled over to form 3/16 -inch minimum lip (return), minimum thickness of base (uncoated) metal and minimum depth as follows: 1 Thickness: 0 0329 inch, unless otherwise indicated. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPTTAL 2 MAIN /SURGERY ADDTTION ALTERATIONS SECTION 09255 PAGE 4 GYPSUM BOARD ASSEMBLIES 2. Depth. 2 -1/2 inches, unless otherwise indicated. 3 Protective Coating: Manufacturer's standard corrosion resistant coating. 4 Protective Coating: G40 'hot-dip galvanized coating per ASTM A 525 for framing for exterior soffits and ceiling suspension members in areas within 10 feet of exterior walls. G. Steel Rigid Furring Channels ASTM C 645 hat- shaped, depth of 7/8 inch, and minimum thickness of base (uncoated) metal as follows: 1 Thickness: 0.0329 inch, unless otherwise indicated. 2. Protective Coating: Manufacturer's standard corrosion resistant coating. 3 Protective Coating: G40 hot -dip galvanized coating per ASTM A 525 for framing for exterior soffits and ceiling suspension members in areas within 10 feet of exterior walls. H. Steel Resilient Furring Channels: Manufacturer's standard product designed to reduce sound transmission, fabricated from steel sheet complying with ASTM A 525 or ASTM A 568 to form 1/2- inch -deep channel of one of the following configurations: 1 Single -Leg Configuration. Asymmetric- shaped channel with face connected to a single flange by a single slotted leg (web). 2. Double -Leg Configuration. Hat- shaped channel, with 1- 1 /2- inch -wide face connected to flanges by double slotted or expanded metal legs (webs). Grid Suspension System for Interior Ceilings: ASTM C 645 manufacturer's standard direct hung grid suspension system composed of main beams and cross furring members that interlock to form a modular supporting network. 2.3 STEEL FRAMING FOR WALLS AND PARTITIONS A. General. Provide steel framing members complying with the following requirements: 1 Component Sizes and Spacings: As indicated but not less than that required to comply with ASTM C 754 under the following maximum deflection and lateral loading conditions: a. Maximum Deflection. L/240 at 5 Ibs per sq. ft. 2. Protective Coating: G40 hot -dip galvanized coating per ASTM A 525 for framing members attached to and within 10 feet of exterior walls. B. Steel Studs and Runners: ASTM C 645 with flange edges of studs bent back 90 deg and doubled over to form 3/16- inch -wide minimum lip (return) and complying with the following requirements for minimum thickness of base (uncoated) metal and for depth. 1 Thickness: As indicated. 2. Depth. As indicated. C. Special Fire Rated Deflection Track Receiving Channel. UL listed 25 MSG galvanized ceiling track designed to work in conjunction with field cut gypsum wall panels to seal the top of rated partitions at fluted decks while still allowing for movement of the deck above. 1 Thickness: As indicated. 2. Depth. As indicated. 3 Quality Standard: Fire Trak Corp. 1 (800) 394 -9875 D Steel Rigid Furring Channels: ASTM C 645 hat- shaped, depth and minimum thickness of base (uncoated) metal as follows: MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS 1 Depth. 7/8 inch. 2. Thickness: 0.0179 inch, unless otherwise indicated. 2.4 GYPSUM BOARD PRODUCTS SECTION 09255 PAGE 5 GYPSUM BOARD ASSEMBLIES E. Furring Brackets: Serrated -arm type, adjustable, fabricated from corrosion resistant steel sheet complying with ASTM C 645 minimum thickness of base (uncoated) metal of 0 0329 inch, designed for screw attachment to steel studs and steel rigid furring channels used for furring. F Steel Resilient Furring Channels: Manufacturer's standard product designed to reduce sound transmission, fabricated from steel sheet complying with ASTM A 525 or ASTM A 568 to form 1/2- inch -deep channel of one of the following configurations: 1 Single -Leg Configuration: Asymmetric-shaped channel with face connected to a single flange by a single slotted leg (web). 2. Double -Leg Configuration: Hat- shaped channel, with 1- 1 /2- inch -wide face connected to flanges by double slotted or expanded metal legs (webs). G. Z- Furring Members: Manufacturer's standard Z- shaped furring members with slotted or nonslotted web, fabricated from steel sheet complying with ASTM A 525 or ASTM A 568; with a minimum base metal (uncoated) thickness of 0 0179 inch, face flange of 1 -1/4 inch, wall- attachment flange of 7/8 inch, and of depth required to fit insulation thickness indicated. H. Fasteners for Metal Framing: Provide fasteners of type, material, size, corrosion resistance, holding power, and other properties required to fasten steel flaming and furring members securely to substrates involved; complying with the recommendations of gypsum board manufacturers for applications indicated. A. General. Provide gypsum board of types indicated in maximum lengths available to minimize end to-end butt joints. 1 Thickness: Provide gypsum board in thicknesses indicated or if not otherwise indicated, minimum 5/8 inch thickness in compliance with ASTM C 840 for application system and support spacing indicated. B. Gypsum Wallboard. ASTM C 36 and as follows: 1. Type: Type X where required for fire- resistive -rated assemblies. 2. Edges: Tapered. 3 Thickness: 5/8 inch unless otherwise indicated. 4 Available Products: Subject to compliance with requirements, products that may be incorporated in the Work where type X gypsum wallboard is indicated include, but are not limited to, the following: a. Gyprock Fireguard C Gypsum Board, Domtar Gypsum. b. Firestop Type C, Georgia- Pacific Corp. c. Fire- Shield G, Gold Bond Building Products Div National Gypsum Co. d. SHEETROCK Brand Gypsum Panels, FIRECODE C Core, United States Gypsum Co. C. Gypsum Backing Board for Multilayer Applications: ASTM C 442 or, where backing board is not available from manufacturer, gypsum wallboard, ASTM C 36 1 Type: Type X where required for fire- resistive -rated assemblies. MAHLUM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPTTAL 2 MAIN /SURGERY ADDITION ALTERATIONS 2. Thickness: 5/8 inch, unless otherwise indicated. 2.5 TRIM ACCESSORIES 2.6 JOINT TREATMENT MATERIALS SECTION 09255 PAGE 6 GYPSUM BOARD ASSEMBLIES A. Accessories for Interior Installation: Corner beads, edge trim, and control joints complying with ASTM C 1047 and requirements indicated below 1. Material. Formed metal, plastic, or metal combined with paper. 2. Shapes indicated below by reference to Fig. 1 designations in ASTM C 1047 a. Cornerbead on outside corners, unless otherwise indicated. b. LC -bead with both face and back flanges; face flange formed to receive joint compound. Use LC -beads for edge trim unless otherwise indicated. c. Lead with face flange only face flange formed to receive joint compound. Use L- bead where indicated. d. U -bead with face and back flanges; face flange formed to be left without application of joint compound. Use U -bead where indicated. e. One -piece control joint formed with V- shaped slot, with removable strip covering slot opening. A. 'General. Provide joint treatment materials complying with ASTM C 475 and the recommendations of both the manufacturers of sheet products and of joint treatment materials for each application indicated. B. Joint Tape for Gypsum Board: Paper reinforcing tape, unless otherwise indicated. 1 Use pressure- sensitive or staple- attached open -weave glass -fiber reinforcing tape with compatible joint compound where recommended by manufacturer of gypsum board and joint treatment materials for application indicated. C. Setting -Type Joint Compounds for Gypsum Board. Factory- packaged, job mixed, chemical hardening powder products formulated for uses indicated. 1 Where setting -type joint compounds are indicated as a taping compound only or for taping and filling only use formulation that is compatible with other joint compounds applied over it. 2. For prefilling gypsum board joints, use formulation recommended by gypsum board manufacturer for this purpose. D Drying -Type Joint Compounds for Gypsum Board. Factory packaged vinyl -based products complying with the following requirements for formulation and intended use. 1. Ready -Mixed Formulation. Factory-mixed product. 2. Taping compound formulated for embedding tape and for first coat over fasteners and face flanges of trim accessories. 3 Topping compound formulated for fill (second) and finish (third) coats. 4 All- purpose compound formulated for both taping and topping compounds. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS 2.7 ACOUSTICAL SEALANT 2.8 MISCELLANEOUS MATERIALS PART 3 EXECUTION 3.1 EXAMINATION 3.2 INSTALLING STEEL FRAMING, GENERAL SECTION 09255 PAGE 7 GYPSUM BOARD ASSEMBLIES A. Acoustical Sealant for Concealed Joints: Manufacturer's standard nondrying, nonhardening, nonskinning, nonstaining; gunnable, synthetic rubber sealant recommended for sealing interior concealed joints to reduce transmission of airborne sound. B. Products: Subject to compliance with requirements, provide one of the following: 1 Acoustical Sealant for Concealed Joints: a. BA -98, Pecora Corp. b. Tremco Acoustical Sealant, Tremco, Inc. A. General. Provide auxiliary materials for gypsum board construction that comply with referenced standards and recommendations of gypsum board manufacturer B. Steel drill screws complying with ASTM C 1002 for the following applications: 1. Fastening gypsum board to steel members less than 0 03 inch thick. 2. Fastening gypsum board to wood members. 3 Fastening gypsum board to gypsum board. C. Steel drill screws complying with ASTM C 954 for fastening gypsum board to steel members from 0.033 to 0 112 inch thick. D Gypsum Board Nails: ASTM C 514 E. Asphalt- Saturated Organic Felt: ASTM D 226, Type I (No. 15 asphalt felt), nonperforated. F Sound Attenuation Blankets: Unfaced mineral -fiber blanket insulation produced by combining mineral fibers of type described below with thermosetting resins to comply with ASTM C 665 for Type I (blankets without membrane facing) 1. Mineral -Fiber Type: Fibers manufactured from glass or slag. 2. Blanket thickness: 3 -1/2 inches. A. Examine substrates to which gypsum board assemblies attach or abut, installed hollow metal frames, cast -in- anchors, and structural framing with Installer present for compliance with requirements for installation tolerances and other conditions affecting performance of assemblies specified in this Section. Do not proceed with installation until unsatisfactory conditions have been corrected. A. Steel Framing Installation Standard: Install steel framing to comply with ASTM C 754 and with ASTM C 840 requirements that apply to framing installation. B. Install supplementary framing, blocking, and bracing at terminations in gypsum board assemblies to support fixtures, equipment services, heavy trim, grab bars, toilet accessories, furnishings, or similar construction. Comply with details indicated and with recommendations MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS SECTION 09255 PAGE 8 GYPSUM BOARD ASSEMBLIES of gypsum board manufacturer or, if none available, with "Gypsum Construction Handbook" published by United States Gypsum Co. C. Isolate steel framing from building structure at locations indicated to prevent transfer of loading imposed by structural movement at locations indicated below 1. Where building structure abuts ceiling perimeter or penetrates ceiling. 2. Where partition framing and wall furring abut structure except at floor. a. Provide slip- or cushioned -type joints as detailed to attain lateral support and 'avoid axial loading. D Do not bridge building expansion and control joints with steel framing or furring members. Independently frame both sides of joints with framing or furring members as indicated, or if not indicated, at spacings and locations required by Northwest Wall and Ceiling Bureau Standard GWB-4 and as approved by the Architect for visual effect. 3.3 INSTALLING STEEL FRAMING FOR SUSPENDED AND FURRED CEILINGS A. Suspend ceiling hangers from building structural members and as follows: 1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structural or ceiling suspension system. Splay hangers only where required to miss obstructions and offset resulting horizontal forces by bracing, counter splaying, or other equally effective means. 2. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with the location of hangers required to support standard suspension system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards. 3 Secure wire hangers by looping and wire- tying, either directly to structures or to inserts, eye screws, or other devices and fasteners that are secure and appropriate for substrate, and in a manner that will not cause them to deteriorate or otherwise fail due to age, corrosion, or elevated temperatures. 4 Secure flat, angle, channel, and rod hangers to structure, including intermediate framing members, by attaching to inserts, eye screws, or other devices and fasteners that are secure and appropriate for structure as well as for type of hanger involved, and in a manner that will not cause them to deteriorate or fail due to age, corrosion, or elevated temperatures. 5 Do not attach hangers to steel deck tabs. 6. Do not attach hangers to steel roof deck. Attach hangers to structural members. 7 Do not connect or suspend steel framing from ducts, pipes or conduit. B. Sway brace suspended steel framing with hangers used for support. C. Install suspended steel framing components in sizes and at spacings indicated but not less than that required by the referenced steel framing installation standard. D Installation Tolerances Install steel framing components for suspended ceilings so that cross furring members or grid suspension members are level to within 1/8 inch in 12 feet as measured both lengthwise on each member and transversely between parallel members. E. Wire-tie or clip furring members to main runners and to other structural supports as indicated. 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS SECTION 09255 PAGE 9 GYPSUM BOARD ASSEMBLIES F Grid Suspension System. Attach perimeter wall track or angle where grid suspension system meets vertical surfaces. Mechanically join main beam and cross furring members to each other and butt-cut to fit into wall track. 3.4 INSTALLING STEEL FRAMING FOR WALLS AND PARTITIONS A. Install runners (tracks) at floors, ceilings, and structural walls and columns where gypsum board stud assemblies abut other construction. 1. Where studs are installed directly against exterior walls, install asphalt felt strips between studs and wall. B. Installation Tolerances: Install each steel framing and furring member so that fastening surfaces do not vary more than 1/8 inch from the plane formed by the faces of adjacent framing. C. Extend partition framing above suspended ceilings and brace to structural supports as detailed, except where partitions are indicated to terminate at suspended ceilings. Continue framing over frames for doors and openings and frame around ducts penetrating partitions above ceiling to provide support for gypsum board. 1 For STC -rated and fire- resistive -rated partitions requiring partitions to extend to the underside of floor /roof slabs and decks or other continuous solid structural surfaces to obtain ratings, install framing around structural and other members extending below floor /roof slabs and decks, as needed, to support gypsum board closures needed to make partitions continuous from floor to underside of solid structure. D E. F G. Terminate partition framing at suspended ceilings where indicated. Brace as shown drawings. Install foam tape at top channel as shown on drawings. Install steel studs and furring in sizes and at spacings indicated but not less than that required by the referenced steel framing installation standard to comply with maximum deflection and minimum loading requirements specified. 1. Single -Layer Construction. Space studs at 24 inches o.c. unless otherwise indicated. on Install steel studs so that flanges point in the same direction and so that leading edges or ends of each gypsum board can be attached to open (unsupported) edges of stud flanges first. Frame door openings to comply with details indicated, with GA -219 and with applicable published recommendations of gypsum board manufacturer Attach vertical studs at jambs with screws either directly to frames or to jamb anchor clips on door frames; install runner track section (for cripple studs) at head and secure to jamb studs. 1 Extend vertical jamb studs through suspended ceilings and attach to underside of floor or roof structure above. H. Frame openings other than door openings to comply with details indicated or, if none indicated, in same manner as required for door openings Install framing below sills of openings to match framing required above door heads. Install fire rated deflection track receiving channels in accordance with manufacturer's instructions to provide required F and T ratings. Ensure that anchoring devices, back -up material, clips, supports, and other materials are as used in fire tests. 1. Provide fire rated deflection track receiving channels of width to accommodate studs. Attach to floor /ceiling decking, roof decking, structure, or ceiling with anchors spaced no more than 24 inches on center MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS 3.5 INSTALLATION OF SOUND DEADENING FOR HOLLOW METAL FRAMES A. Coordinate installation of grout in hollow metal frames with suppliers. B. Apply 1/2 -inch minimum plaster to all frames in drywall construction. C. Grout full all frames at fire and sound rated construction, all exterior locations, and adjacent to masonry construction. 3.6 APPLYING AND FINISHING GYPSUM BOARD, GENERAL SECTION 09255 PAGE 10 GYPSUM BOARD ASSEMBLIES A. Gypsum Board Application and Finishing Standards: Install and finish gypsum panels to comply with ASTM C 840 and GA -216. B. Install sound attenuation blankets where indicated prior to installing gypsum panels unless blankets are readily installed after panels have been installed on one side. C. Install ceiling board panels across framing to minimize the number of abutting end joints and avoid abutting end joints in the central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member D Install wall/partition board panels to minimize the number of abutting end joints or avoid them entirely Stagger abutting end joints not less than one framing member in alternate courses of board. At stairwells and other high walls, install panels horizontally with end abutting joints over studs and staggered. E. Install gypsum panels with face side out. Do not install imperfect, damaged, or damp panels. Butt panels together for a light contact at edges and ends with not more than 1/16 inch of open space between panels. Do not force into place. F Locate both edge or end joints over supports, except in ceiling applications where intermediate supports or gypsum board back blocking is provided behind end joints. Position adjoining panels so that tapered edges abut tapered edges, and field -cut edges abut field-cut edges and ends. Do not place tapered edges against cut edges or ends. Stagger vertical joints over different studs on opposite sides of partitions. Avoid joints at comers of framed openings where possible. G. Attach gypsum panels to steel studs so that the leading edge or end of each panel is attached to open (unsupported) edges of stud flanges first. H. Attach gypsum panels to framing provided at openings and cutouts. I. Form control joints and expansion joints at locations indicated and as detailed, with space between edges of adjoining gypsum panels, as well as supporting framing behind gypsum panels. J Cover both faces of steel stud partition framing with gypsum panels in concealed spaces (above ceilings, etc.) where indicated, except in chase walls that are braced internally 1 Except where concealed application is indicated or required for sound, fire, air, or smoke ratings, coverage may be accomplished with scraps of not less than 8 sq. ft. in area. 2. Fit gypsum panels around ducts, pipes, and conduits. K. Isolate perimeter of non load bearing gypsum board partitions at structural abutments, except floors. Provide 1/4- inch- to -1/2- inch -wide spaces at these locations and trim edges with U -bead MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS SECTION 09255 PAGE 11 GYPSUM BOARD ASSEMBLIES edge trim where edges of gypsum panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant. L. Where STC -rated gypsun1 board assemblies are indicated, seal construction at perimeters, behind control and expansion joints, openings, and penetrations with a continuous bead of acoustical sealant including a bead at both faces of the partitions. Comply with ASTM C 919 and manufacturer's recommendations for location of edge trim and closing off sound flanking paths around or through gypsum board assemblies, including sealing partitions above acoustical ceilings. M. Space fasteners in gypsum panels according to referenced gypsum board application and finishing standard and manufacturer's recommendations. N. At fire rated partitions, trim gypsum panels to fit flutes at underside of metal decks and fasten to fire rated deflection track receiving channels per manufacturer's instructions. Coordinate with 07900 to assure complete assembly as tested and listed by UL 3.7 GYPSUM BOARD APPLICATION METHODS A. Single -Layer Application. Install gypsum wallboard panels as follows: 1 On ceilings, apply gypsum panels prior to wall/partition board application to the greatest extent possible and at right angles to framing, unless otherwise indicated. 2. On partitions/walls, apply gypsum panels horizontally (perpendicular to framing), unless parallel application is required for fire- resistive -rated assemblies. Use maximum length panels to minimize end joints. 3 On Z- furring members, apply gypsum panels vertically (parallel to framing) with no end joints. Locate edge joints over furring members. B Double -Layer Application. Install gypsum backing board for base layers and gypsum wallboard for face layers. 1 On ceilings, apply base layer prior to applying base layer on walls/partitions; apply face layers in same sequence. Offset face -layer joints at least 10 inches from parallel base layer joints. Apply base layers at right angles to framing members unless otherwise indicated. 2. On partitions/walls, apply base layers and face layers vertically (parallel to framing) with joints of base layers located over stud or furring member and face layer joints offset at least one stud or furring member with base layer joints. Stagger joints on opposite sides of partitions. 3 On Z-furring members, apply base layer vertically (parallel to framing) and face layer either vertically (parallel to framing) or horizontally (perpendicular to framing) with vertical joints offset at least one furring member. Locate edge joints of base layer over furring members. C. Single -Layer Fastening Methods: Apply gypsum panels to supports as follows: 1 Fasten with screws. D Double -Layer Fastening Methods: Apply base layer of gypsum panels and face layer to base layer as follows: 1. Fasten both base layers and face layers separately to supports with screws. MAHLUM NORDFORS McIaNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS 3.8 INSTALLING TRIM ACCESSORIES A. General. For trim accessories with back flanges, fasten to framing with the same fasteners used to fasten gypsum board. Otherwise, fasten trim accessories according to accessory manufacturer's directions for type, length, and spacing of fasteners. B. Install' corner beads at external corners. C. Install edge trim where edge of gypsum panels would otherwise be exposed or semiexposed. Provide edge trim type with face flange formed to receive joint compound except where other types are indicated. 1 Install LC -bead where gypsum panels are tightly abutted to other construction and back flange can be attached to framing or supporting substrate. 2. Install LK -bead where substrate is kerfed to receive long flange of trim. 3 Install L-bead where edge trims can only be installed after gypsum panels are installed. 4 Install U -type trim where edge is exposed, revealed, gasketed, or sealant-filled (including expansion joints.) D Install control joints at locations indicated, and where not indicated according to Northwest Wall and Ceiling Bureau Standard G.W.B. -4 and in locations approved by Architect for visual effect. 3.9 FINISHING GYPSUM BOARD ASSEMBLIES SECTION 09255 PAGE 12 GYPSUM BOARD ASSEMBLIES A. General. Apply joint treatment at gypsum board joints (both directions); flanges of corner bead, edge trim, and control joints; penetrations; fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration and levels of gypsum board finish indicated. B. Prefill open joints, rounded or beveled edges, and damaged areas using setting -type joint compound. C. Apply joint tape over gypsum board joints except those with trim accessories having concealed face flanges not requiring taping to prevent cracks from developing in joint treatment at flange edges. D Levels of Gypsum Board Finish: Provide the following levels of gypsum board finish per GA- 214 1. Level 1 for ceiling plenum areas, concealed areas, and where indicated, unless a higher level of finish is required for fire- resistive -rated assemblies and sound -rated assemblies. 2. Level 2 where water resistant gypsum backing board panels form substrates for tile, and where indicated. 3 Level 4 for gypsum board surfaces unless otherwise indicated. E. For level 4 gypsum board finish, embed tape in joint compound and apply three separate coats of joint compound over joints, angles, fastener heads, and accessories. Touch up and sand between coats and after last coat as needed to produce a surface free of visual defects and ready for decoration. F Where level 2 gypsum board finish is indicated, apply joint specified for first coat in addition to embedding coat. MAHLUM NORDFORS McIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS SECTION 09255 PAGE 13 GYPSUM BOARD ASSEMBLIES G. Where level 1 gypsum board finish is indicated, apply joint compound specified for embedding coat. H. Judging: Follow the recommended procedure for judging and finishing as per Northwest Wall and Ceiling Bureau Standard G.W.B. -2. Coordinate with Painting subcontractor. 3.10 CLEANING AND PROTECTION A. Promptly remove any residual joint compound from adjacent surfaces. B. Provide final protection and maintain conditions, in a manner suitable to Installer, that ensures gypsum board assemblies remain without damage or deterioration at time of Substantial Completion. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 09255 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McI INLEY GORDON SECTION 09280 PAGE 1 OLYMPIC MEMORIAL HOSPITAL GLASS REINFORCED GYPSUM 2 MAIN/SURGERY ADDITIONS ALTERATIONS FABRICATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary c onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Work in this Section includes: 1 Molded glass fiber reinforced gypsum column covers. B. Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 9 "Gypsum Board Assemblies" for metal stud framing and gypsum board installation. 2. Division 9 "Painting" for finishing. 1.3 DEFINITIONS A. G.R.G. Molded glass fiber reinforced gypsum composites. 1.4 SUBMITTALS A. General. Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B. Product data from manufacturers for each type of G.RG. column cover assembly C. Shop Drawing showing plans, sections, details, joint treatment, reinforcing fastening devices, and relation to adjacent construction. 1.5 QUALITY ASSURANCE A. Single -Source Responsibility Obtain components for G.R.G. column covers from a single manufacturer for each type of assembly indicated. 1.6 DELIVERY STORAGE, AND HANDLING A. Deliver materials in specially built crates designed to protect the pieces from damage, dirt, moisture and warpage. B. Lift and support pieces only at points indicated for attachment on drawings. C. Store materials inside in original crates under cover and keep them dry and protected against damage from weather, direct sunlight, surface contamination, corrosion, construction traffic, and other causes. Once uncrated, store material in upright position on a flat, smooth and level surface. Avoid stacking and leaning of pieces as much as possible. Maintain a consistent temperature and humidity level throughout storage, installation, and finishing. D Handle column covers to prevent damage to edges, ends, and surfaces. Do not bend or otherwise damage metal trim and framing components. MAHLUM NORDFORS McIdNNLEY GORDON SECTION 09280 PAGE 2 OLYMPIC MEMORIAL HOSPITAL GLASS- REINFORCED GYPSUM 2 MAIN /SURGERY ADDITIONS ALTERATIONS FABRICATIONS PART 2- PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: 1 'Castings Design, Inc. (800) 329 -7373 2. Pittcon Industries (800) 637 -7638 3 Others as approved by addendum. 2.2 MATERIALS A. General. Glass fiber reinforced gypsum to be fabricated using long strand continuous glass fiber mats laminated with high strength gypsum cement. All embeds and reinforcement to be galvanized steel. B. G.R.G. Assemblies: Store manufactured assemblies in controlled conditions for a sufficient period of time to ensure product stability before being shipped. All assemblies to have identification marks, as indicated on shop drawings, clearly displayed on backside of part. C. Miscellaneous Materials: All screws, clips, adhesives, shims, hangerwire, etc. to be per manufacturer's shop drawings and/or job specifications and shall be supplied by installer of G.R.G. materials. D Physical Properties: The G.RG assembly components shall comply with the following physical properties: 1 Glass Fiber Content: 5 to 6% by weight 2. Shell Thickness: 1/4 inch nominal 3 Weight: 2 lbs per foot 4 Density 101 7 lbs per foot 5 Finish. Smooth 6 Tensile Strength. 1358 per ASTM D790 7 Flexural strength. 4118 per ASTM D790 8 Compressive Strength. 7030 per ASTM D695 9 Impact Resistance: 8.34 ft. lbs per inch per ASTM D256 10 Humidified Deflection. 1/16 inch E. Tolerances: The G.R.G assembly components shall comply with the following tolerances: 1 Dimension, all directions: 3/16 inch 2. Thickness: 1/4 inch 1/8 inch 3 Warpage or Bowing: 1/8 inch per foot, not to exceed 1 inch PART 3- EXECUTION 3.1 EXAMINATION A. Verify all marks and check jobsite conditions for clearance, working space and all marks provided before commencement of installation. Inspect all pieces prior to installation and make any necessary repairs. Notify Architect of any discrepancies affecting the installation of the 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON SECTION 09280 PAGE 3 OLYMPIC MEMORIAL HOSPITAL GLASS REINFORCED GYPSUM 2 MAIN/SURGERY ADDITIONS ALTERATIONS FABRICATIONS G.R.G. assemblies. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. General Install material level and plumb and as shown in the approved shop drawings. Securely anchor pieces and finish joints as shown in the shop drawings and per manufacturer's recommendations. B Provide G.R.G. column covers in lengths sufficient to install units with 6 inch rise above ceiling. C. Tape, float and sand all joints per Division 8 Section `Gypsum Board Assemblies' and the U.S. Gypsum Construction Handbook, latest edition. Patch countersunk fasteners and any damage to match texture of G.R.G. assembly 0 1997 Mahhun Nordfors McKinley Gordon END OF SECTION 09280 1 1 MAHLUM NORDFORS MCKZNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 09300 PAGE 1 CERAMIC TILE A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Provide materials, labor, equipment, inspection, coordination, and supervision necessary for the best and most complete installation per industry standards of tile work as indicated in this specification and on the project drawings. B. Section includes: 1. Waterproof membrane 2. Mortar setting beds and bond coatings 3 Grout 4 Unglazed ceramic mosaic tile 5 Marble thresholds 6 Cementitious Backer Board. C. Related work specified elsewhere includes: 1 Division 3 Section `Underlayment' for cementitious underlayments D Design requirements include: 1 Fire -Rated Construction. At locations indicated, provide fire -rated assemblies tested per ASTM E119 and acceptable to authorities for ratings required. 2. Sound -Rated Construction: At locations indicated, provide construction built in accordance with manufacturer's assemblies, laboratory- tested per ASTM E90 for designated STC ratings. 1.3 SUBMITTALS A. General. Comply with Section 01300 Submittals. B. Product Data. Manufacturer's technical information and installation instructions for materials required, except bulk materials. C. Samples for Verification Purposes: Submit the following: 1 Samples for each type of tile and for each color and texture required, not less than 12 inches square, on plywood or hardboard backing, and grouted. 2. Full -size samples for each type of trim and accessory and for each color 3 Samples threshold material. D Qualification Data. For firms and persons specified to demonstrate their capabilities and experience. Include list of completed projects with project names, addresses, and names of architects and owners. MAIH.UM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 PROJECT CONDITIONS SECTION 09300 PAGE 2 CERAMIC TILE 1.4 QUALITY ASSURANCE A. General: Comply with Section 01400, Quality Control. B. Source of Materials: Provide materials obtained from one source for each type and color of tile, grout, and setting materials. C. Installer's Qualifications: Firm with not less than 10 years of successful experience in work similar in scope to the work of this project. D Industry Standard. Comply with materials and installation standards and procedures stated in the Handbook for Ceramic Tile Installation by the Tile Council of America, latest edition. 1.5 DELIVERY STORAGE, AND HANDLING A. Comply with Section 01610, Delivery Storage, and Handling. B. Comply with ANSI A137 1 for labeling sealed tile packages. C. Deliver and store packaged materials in original containers with seals unbroken and labels intact until time of use. Prevent damage or contamination to materials by water, freezing, foreign matter, or other causes. A. Verify conditions at site affecting work to ensure the best and most complete installation per industry standards. B Maintain environmental conditions and protect work during and after installation to comply with referenced standards and manufacturer's printed recommendations. C. Vent temporary heaters to exterior to prevent damage to tile work from carbon dioxide buildup. D Maintain temperatures at not less than 50 degrees F in tiled areas during installation and for 7 days after completion, unless higher temperatures are required by referenced installation standard or manufacturer's instructions. PART 2 PRODUCTS 2.1 GENERAL A. ANSI Standard for Tile Installation Materials: Comply with ANSI standard referenced with products and materials indicated for setting and grout. B. Colors, Textures, and Patterns 1 For tile, grout, and other products requiring selection of colors, surface textures, or other appearance characteristics, refer to Finish Schedule in Volume 1, Project Drawings. 2. Provide tile trim and accessories which match color and finish of adjoining flat tile, unless otherwise indicated. C. Factory Blending: For tile exhibiting color variations within the ranges selected during sample submittals, blend tile in factory and package accordingly so that tile units taken from one package will show the same range in colors as those taken from other packages and will match approved samples. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.2 CEMENTI:TIOUS BACKER BOARD B. Quality Standard Product: Dens Shield' by Georgia Pacific 2.3 WATERPROOFING FOR THINSET TILE INSTALLATIONS SECTION 09300 PAGE 3 CERAMIC TILE A. Composition: Composite board with silicone treated glass mat core and heat -cured co- polymer water and vapor retardant'face sheet. A. Latex Rubber Waterproofing: Manufacturer's standard factory- prepackaged, job -mixed, proprietary two -part formulation consisting of liquid latex rubber and powder for trowel application and glass fiber fabric reinforcing. B. Synthetic Polymer Waterproofing: Manufacturer's standard proprietary product consisting of factory- prepackaged, job -mixed two component synthetic polymer formulation for trowel application and glass fiber fabric reinforcing. C. Available Products: Subject to compliance with requirements, products which may be incorporated in the Work include, but are not limited to, the following: D Products: Subject to compliance with requirements, products which may be incorporated in the work include, but are not limited to the following: 1 Latex Rubber Waterproofing: a. "Laticrete 301/335 Waterproof Membrane" Laticrete International Inc. 2. Synthetic Polymer Waterproofing: a. "Planicrete W Mapei Corp. 2.4 SETTING MATERIALS A. Portland Cement Mortar Installation Materials: Provide materials complying with ANSI A108.1 and as specified below 1 Reinforcing Wire Fabric: Galvanized welded wire fabric, 2 inches by 2 inches WO.3 by WO.3 (16 ASW gage or 0 0625 inch diameter); comply with ASTM A 185 and ASTM A 82 except for minimum wire size. B. Portland Cement Mortar ANSI A118.1, reinforced portland cement and sand mortar bed for forming accurate slopes to drain. 1 Prepackaged dry mortar mix composed of portland cement, graded aggregate, and the following dry polymer additive in the form of a reemulsifiable powder to which only water is added at job site. a. Dry Polymer Additive: Manufacturer's standard. C. Dry-Set Portland Cement Mortar ANSI A118.1 factory sanded mortar for use as a bond coat for thin- setting tile over cured mortar bed or cementitious backer board. 2.5 GROUTING MATERIALS A. Latex Portland Cement Grout: ANSI A118.6, a mixture of dry -set portland cement grout with latex additives for grouting of thin -set tile. Composition as follows: 1 Latex additive (water emulsion) serving as replacement for part or all of gauging water added at job site with dry grout mixture, with type of latex and dry grout mix as follows: a. Manufacturer's standard MAHLUM NORDFORS MCIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2. Dry Grout Mixture: Dry-set grout specified or supplied by latex additive manufacturer. Use latex additive without retarder with dry-set grout. a. Application. Use dry-set grout combined with latex additive for grouting joints in floor and wall tile. 2.6 MISCELLANEOUS MATERIALS A. Tile Cleaner Product specifically acceptable to tile manufacturer and grout manufacturer for application indicated and as recommended by National Tile Promotion Federation or Ceramic Tile Institute. B. Temporary Protective Coating 1 Product indicated below that is formulated to protect exposed surfaces of tile against adherence of mortar and grout, is compatible with tile and mortar /grout products, and is easily removable after grouting is completed without damaging grout or tile. a. Petroleum Paraffin wax, applied hot. b. Grout release in form of manufacturer's standard proprietary liquid coating that is specially formulated and recommended for use as a temporary protective coating for tile. C. Miscellaneous Items: Install per applicable TCA details and recommendations, whether or not shown. Provide integral base. 2.7 MIXING MORTARS AND GROUT PART 3 EXECUTION 3.1 EXAMINATION 3.2 BACKER BOARD SECTION 09300 PAGE 4 CERAMIC TILE A. Mix mortars and grouts to comply with requirements of referenced standards and manufacturers including those for accurate proportioning of materials, water, or additive content; type of mixing equipment, selection of mixer speeds, mixing containers, mixing time, and other procedures needed to produce mortars and grouts of uniform quality with optimum performance characteristics for application indicated. A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work will be construed as acceptance of conditions. B. Examine surfaces to receive tile work, with installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of installed tile. Do not proceed with tile work until surfaces and conditions comply with requirements indicated in referenced tile installation standard. A. General. Provide Cementitious Backer Board at vertical and overhead horizontal surfaces scheduled to receive tile. Use maximum lengths possible to minimize number of joints. Stagger intermediate end joints of adjacent lengths of board. Attach to framing with fasteners recommended by board manufacturer, spaced 6' to 8" on center B. Installation. Install backer boards in accordance with manufacturer's recommendations and TCA `Handbook for Ceramic Tile Installation, Methods W244 B415 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAINISURGERY ADDITIONS ALTERATIONS SECTION 09300 PAGE 5 CERAMIC TILE C. Finishing: Apply glass mesh joint tape over joints. Embed tape in setting material indicated for specified tile finishes. Allow joints to dry prior to installing tile systems. 3.2 PREPARATION A. General. Prepare substrates and connecting work to enable the best and most complete installation per industry standards of the work of this section. B. Blending: For tile exhibiting color variation within the ranges selected, verify that tile has been blended in factory and packaged accordingly so that tile units taken from one package will show the same range in colors as those taken from other packages and will match approved samples. If not factory blended, either return to manufacturer or blend tiles at project site before installing. C. Field Applied Temporary Protective Coating: Where indicated under tile type or needed to prevent adhesion or staining of exposed tile surfaces by grout, precoat exposed tile surfaces with a continuous film of temporary protective coating, taking care not to coat unexposed tile surfaces. 3.3 INSTALLATION A. General 1 ANSI Tile Installation Standard: Comply with applicable parts of ANSI A108 series of tile installation standards included under "American National Standard Specifications for the Installation of Ceramic Tile" for the type of setting and grouting materials and methods indicated. 2. TCA Installation Guidelines: TCA "Handbook for Ceramic Tile Installation" comply with TCA installation methods indicated, or if not otherwise indicated, as applicable to installation conditions shown. 3 Workmanship Extend tile work into recesses and under or behind equipment and fixtures, to form a complete covering without interruptions. Terminate work neatly at obstructions, edges, and corners without disrupting pattern or joint alignment. 4 Intersection and Returns: Accurately form intersections and returns. Perform cutting and drilling of tile without marring visible surfaces. Carefully grind cut edges of tile abutting trim, finish, or built -in items for straight, aligned joints. Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so that plates, collars, or covers overlap tile. 5 Joint Patterns a. Lay tile joints in grid pattern, unless otherwise shown. Align joints when adjoining tiles on floor, base, walls, and trim are same size. Lay out tile work and center tile fields in both directions in each space or on each wall area. Adjust to minimize tile cutting. Provide uniform joint widths, unless otherwise shown. 6. Grout: Grout tile to comply with the requirements of the following installation standards: a. Ceramic tile grouts; ANSI A108.10 B. Tile Applications 1 Shower Receptors a. Tile: Unglazed ceramic tile. b. Installation Method: Cement Backer Board. TCA B415 -97 (Similar) MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPTTAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 FIELD QUALITY CONTROL A. Comply with Section 01400, Quality Control. B. Provide experienced supervision of all elements of the work of this section. 3.5 CLEANING AND PROTECTION A. General. Comply with Section 01500 Construction Facilities and Temporary Controls, and Section 01710 Final Cleaning. B. Cleaning 1 Upon completion of placement and grouting, clean all ceramic tile surfaces so they are free of foreign matter 2. Remove latex- portland cement grout residue from tile as soon as possible. 3 Remove temporary protective coating by method recommended by coating manufacturer that is acceptable to tile and grout manufacturer Trap and remove coating to prevent it from clogging drains. C. Finished Tile Work: Leave finished installation clean and free of cracked, chipped, broken, unbonded, or otherwise defective tile work. D Protection 1 When recommended by tile manufacturer, apply a protective coat of neutral protective cleaner to completed tile work. Protect installed tile work with kraft paper or other heavy covering during construction period to prevent staining, damage, and wear 2. Prohibit foot and wheeled traffic from using tiled floors for at least 7 days after grouting is completed. 3 Before final inspection, remove protective coverings and rinse neutral cleaner from tile surfaces. 3.6 SCHEDULE A. Provide tile work as indicated. B. Types of tile are referenced on drawings and schedules using a "CT' designation. C. Furnish an additional 5 percent maintenance stock for each type, color, pattern, and size of tile product installed, including all accessories and backing. D Deliver stock of maintenance materials to the Owner Furnish maintenance materials from same lot as materials installed, and enclosed in protective packaging with appropriate identifying labels. 0 1997 Mahlum Nordfors McKinley Gordon c. Mortar Dry-Set Mortar ANSI A108.5 A118.1 d. Grout: Dry -Set Grout SECTION 09300 PAGE 6 CERAMIC TILE END OF SECTION 09300 MAHLUM NORDFORS McKIM.EY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 09511 PAGE 1 ACOUSTICAL PANEL CEILINGS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisioiis of Contract, including General and Supplementary bonditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes acoustical panel ceilings installed with exposed suspension systems, including custom perimeter trims for curved ceiling soffits. B. Related Sections: The following sections contain requirements that relate to this section. 1 Division 15 Section for grilles, registers, and diffusers in acoustical ceilings. 2. Division 16 Section for lighting fixtures in acoustical ceilings. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. 1 Product data for each type of product specified. 2. Coordination drawings for reflected ceiling plans drawn accurately to scale and coordinating penetrations and ceiling- mounted items. Show the following: a. Ceiling suspension members. b. Method of attaching hangers to building structure. c. Ceiling mounted items including light fixtures; air outlets and inlets; speakers; sprinkler heads; and special moldings at walls, column penetrations, and other junctures with adjoining construction. d. Scale: 1/4 inch 1' -0" 3 Samples for verification purposes of each type of exposed finish required, prepared on samples of size indicated below and of same thickness and material indicated for final unit of Work. Where finishes involve normal color and texture variations, include sample sets showing full range of variations expected. a. 6- inch -square samples of each acoustical panel type, pattern, and color b. Set of 12 -inch -long samples of exposed suspension system members, including moldings, for each color and system type required. 4 Qualification data for firms and persons specified in "Quality Assurance" article to demonstrate their capabilities and experience. Include list of completed projects with project names, addresses, names of Architects and Owners, and other information specified. 5 Research reports or evaluation reports of the model code organization acceptable to authorities having jurisdiction that show compliance of acoustical ceiling system and components with building code in effect for Project. 6 Product test reports from qualified independent testing laboratory that are based on its testing of current products for compliance of acoustical ceiling systems and components with requirements. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.4 QUALITY ASSURANCE SECTION 09511 PAGE 2 ACOUSTICAL PANEL CEILINGS A. Installer Qualifications: Engage an experienced Installer who has successfully completed acoustical ceilings similar in material, design, and extent to those indicated for Project. B. Fire Performance Characteristics: Provide acoustical ceilings that are identical to those tested for the following fire performance characteristics, per ASTM test method indicated below by UL or other testing and inspecting organizations acceptable to authorities having jurisdiction. Identify acoustical ceiling components with appropriate markings of applicable testing and inspecting organization. 1 Surface Burning Characteristics: As follows, tested per ASTM E 84 and complying with ASTM E 1264 for Class A products. a. Flame Spread: 25 or less. b. Smoke Developed: 50 or less. C. Single -Source Responsibility for Ceiling Units: Obtain each type of acoustical ceiling unit from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work. D Single -Source Responsibility for Suspension System. Obtain each type of suspension system from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work. E. Coordination of Work: Coordinate layout and installation of acoustical ceiling units and suspension system components with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire- suppression system components, and partition system. 1.5 DELIVERY STORAGE, AND HANDLING A. Deliver acoustical ceiling units to project site in original, unopened packages and store them in a fully enclosed space where they will be protected against damage from moisture, direct sunlight, surface contamination, and other causes. B. Before installing acoustical ceiling units, permit them to reach room temperature and a stabilized moisture content. C. Handle acoustical ceiling units carefully to avoid chipping edges or damaging units in any way 1.6 PROJECT CONDITIONS A. Space Enclosure: Do not install interior acoustical ceilings until space is enclosed and weatherproof, wet -work in space is completed and nominally dry work above ceilings is complete, and ambient conditions of temperature and humidity will be continuously maintained at values near those indicated for final occupancy 1.7 EXTRA MATERIALS A. Deliver extra materials to Owner. Furnish extra materials described below that match products installed, are packaged with protective covering for storage, and are identified with appropriate labels. 1 Acoustical Ceiling Units: Furnish quantity of full -size units equal to 5 0 percent of amount installed. 1 1 1 t 1 1 1 1 1 f 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09511 PAGE 3 ACOUSTICAL PANEL CEILINGS 2. Exposed Suspension System Components: Furnish quantity of each exposed component equal to 2.0 percent of amount installed. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, including acceptance by the Washington State Department of Health where required, provide products by one of the following: 1 Non Fire- Resistance-Rated Wide -Face Double -Web Steel Suspension Systems: a. Armstrong World Industries, Inc. b. Chicago Metallic Corporation. c. National Rolling Mills, Inc. d. USG Interiors, Inc. 2. Edge Moldings: a. Armstrong World Industries, Inc. b. Chicago Metallic Corporation. c. Fry Reglet Corp. d. National Rolling Mills, Inc. e. USG Interiors, Inc. 2.2 ACOUSTICAL CEILING UNITS, GENERAL A. Standard for Acoustical Ceiling Units: Provide manufacturers' standard units of configuration indicated that comply with ASTM E 1264 classifications as designated by reference to types, patterns, acoustical ratings, and light reflectance, unless otherwise indicated. 1 Mounting Method for Measuring NRC: Type E-400 (plenum mounting in which face of test specimen is 15 -3/4 inches [400 mm] away from the test surface) per ASTM E 795 2.3 MINERAL -BASE PANELS WATER FELTED A. Type, Form, and Finish. Provide type III, Form 2 units per ASTM E 1264 with painted finish that comply with pattern and other requirements indicated. B. Perforated Pattern. Units matching pattern indicated by reference to manufacturers' standard pattern designations, with other characteristics as follows: 1. Color/Light Reflectance Coefficient: White/LR 0.80 2. Noise Reduction Coefficient: NRC 0.50 -0.60 3 Ceiling Sound Transmission Class: CSTC 35 -39 4 Edge Detail. As indicated. 5 Size: As indicated. C. Acceptable Products: Provide ceiling units of each type from one of the following: 1 Type AP -1, 24' x 48' x 5/8' tegular lay -in panel a. Use: General purpose ceiling tile used where there are no washable ceiling requirements. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09511 PAGE 4 ACOUSTICAL PANEL CEILINGS b. Quality Standard Product: Armstrong Minatone `Cortega' No. 703 2. Type AP -2, 24 x 48' x 5/8' tegular lay -in washable panel scored for 24' x 24' look. a. Use: In patient roonis and other areas where washable ceilings are required. b. Quality Standard Product: Armstrong Fine Look I RH90, No 1761 3 Type AP -3 24' x 48' x 5/8' tegular lay -in panel, scored for 12' x 12' look. a. Use: In patient rooms and other areas where washable ceilings are required, and other areas where indicated in Finish Schedule. b. Quality Standard Product: Armstrong Fine Look II RH90, No 1760 4 Type AP-4 24 x 48' x 5/8' tegular lay -in panel. a. Use: In patient wing corridors to match texture of AP -2 and AP -3 and other areas where indicated in Finish Schedule. b. Quality Standard Product: Armstrong Fine Fissured RH90 Fire Guard No 1834 (Note -Panel is not part of a fire-rated ceiling assembly 5 Type AP -5 24' x 48' x 5/8' lay -in panel with vinyl coating. a. Use: In surgery corridors and other areas where a high degree of cleanability is desired. Quality Standard Product: Armstrong Nonperforated VL RH90 Fire Guard No. 870 (Note -Panel is not part of a fire -rated ceiling assembly 6 Type AP-6, 24' x 24 x 5/8' lay -in panel with vinyl coating. a. Use: In surgery corridors and other areas where a high degree of cleanability is desired. b. b. Quality Standard Product: Armstrong Nonperforated VL RH90 Fire Guard No. 868 (Note -Panel is not part of a fire -rated ceiling assembly 2.4 METAL SUSPENSION SYSTEMS, GENERAL A. Standard for Metal Suspension Systems: Provide manufacturer's standard metal suspension systems of types, structural classifications, and finishes indicated that comply with applicable ASTM C 635 requirements. B Finishes and Colors: Provide manufacturer's standard factory- applied finish for type of system indicated. C. Attachment Devices: Size for 5 times design load indicated in ASTM C 635 Table 1 Direct Hung unless otherwise indicated. D Wire for Hangers and Ties: ASTM A 641, Class 1 zinc coating, soft temper 1 Gage: Provide wire sized so that stress at 3 times hanger design load (ASTM C 635 Table 1, Direct Hung), will be less than yield stress of wire, but provide not less than 0 106 -inch diameter (12 gage). E. Hanger Rods: Mild steel, zinc coated, or protected with rust- inhibitive paint. F Flat Hangers: Mild steel, zinc coated, or protected with rust- inhibitive paint. G. Angle Hangers: Angles with legs not less than 7/8 inch wide, formed with 0 0365- inch -thick galvanized steel sheet complying with ASTM A 446, Coating Designation G90 with bolted connections and 5/16- inch diameter bolts. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 09511 PAGE 5 ACOUSTICAL PANEL CEILINGS H. Edge Moldings and Trim. Metal or extruded aluminum of types and profiles indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that fit type of edge detail and suspension system indicated. 1. For circular penetrations of ceiling, provide edge moldings fabricated to diameter required to fit penetration exactly I. Acceptable Products: Provide ceiling suspension units per the following: 1 Armstrong Prelude 7300 Series 15/16' exposed tee system. 2.5 NON FIRE RESISTANCE RATED DIRECT HUNG SUSPENSION SYSTEMS A. Wide -Face Capped Double -Web Steel Suspension System. Main and cross runners roll formed from prepainted or electrolytic zinc coated cold- rolled steel sheet, with prefinished 15/16 -inch- wide metal caps on flanges; other characteristics as follows: 1. Structural Classification. Intermediate -Duty System. 2. End Condition of Cross Runners: Override (stepped) type. 3 Cap Material and Finish. Steel sheet painted white. 2.6 CUSTOM PERIMETER TRIM A. General. EdgeTrim System for Suspended Ceiling System formed from extruded aluminum alloy 6063 trim channel, designed to attach to suspended ceiling grid system. B. Trim Channel. 4 inch wide face with 3/4 inch horizontal legs, straight or curved sections as required, factory finished to match suspension grid system. C. Accessories: Splice plates, Tee -Bar connection clips, hanging clips, and drywall bottom trims to suit soffit and ceiling conditions. D Quality Standard Product: Axiom custom perimeter trim by Armstrong Industries. PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates and structural framing to which ceiling system attaches or abuts, with Installer present, for compliance with requirements specified in this and other sections that affect installation and anchorage of ceiling system. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Measure each ceiling area and establish layout of acoustical units to balance border widths at opposite edges of each ceiling. Avoid use of less than- half -width units at borders, and comply with reflected ceiling plans. 3.3 INSTALLATION A. General. Install acoustical ceiling systems to comply with installation standard referenced below per manufacturer's instructions and CISCA "Ceiling Systems Handbook" and "Recommended Standards for Seismic Restraint Direct -Hung Suspended Ceiling Assemblies." 1 Standards for Installation of Ceiling Suspension Systems: Comply with ASTM C 636 and ASTM E 580 MAHLUM NORDFORS McIC NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 09511 PAGE 6 ACOUSTICAL PANEL CEILINGS B. Arrange acoustical units and orient directionally patterned units in a manner shown by reflected ceiling plans. C. Suspend ceiling bangers from building structural members and as follows: 1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structural or ceiling suspension system. Splay hangers only where required to miss obstructions and offset resulting horizontal forces by bracing, countersplaying, or other equally effective means. 2. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with the location of hangers at spacings required to support standard suspension system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards. 3 Secure wire hangers by looping and wire- tying, either directly to structures or to inserts, eyescrews, or other devices that are secure and appropriate for substrate, and in a manner that will not cause them to deteriorate or otherwise fail due to age, corrosion, or elevated temperatures. 4 Secure flat, angle, channel, and rod hangers to structure, including intermediate framing members, by attaching to inserts, eyescrews, or other devices that are secure and appropriate for structure to which hangers are attached as well as for type of hanger involved, and in a manner that will not cause them to deteriorate or fail due to age, corrosion, or elevated temperatures. 5 Space hangers not more than 4 -0' o.c. along each member supported directly from hangers, unless otherwise shown, and provide hangers not more than 8 inches from ends of each member D Install edge moldings of type indicated at perimeter of acoustical ceiling area and where necessary to conceal edges of acoustical units. 1 Sealant Bed. Apply continuous ribbon of acoustical sealant, concealed on back of vertical leg before installing moldings. 2. Screw -attach moldings to substrate at intervals not over 16 inches o.c. and not more than 3 inches from ends, leveling with ceiling suspension system to tolerance of 1/8 inch in 12' -0' Miter corners accurately and connect securely E. Install acoustical panels in coordination with suspension system, with edges concealed by support of suspension members. Scribe and cut panels to fit accurately at borders and at penetrations. F Install custom perimeter trim per manufacturer's recommendations and standard details. Fit trim tightly to suspended grid system and adjacent ceiling materials. 3.4 CLEANING A. Clean exposed surfaces of acoustical ceilings, including trim, edge moldings, and suspension members. Comply with manufacturer's instructions for cleaning and touch -up of minor finish damage. Remove and replace work that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 09511 1 1 1 1 1 1 t 1 1 I 1 f 1 1 MAHLUM NORDFORS McKU LEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Vinyl composition floor tile. 1.3 SUBMITTALS SECTION 09660 PAGE 1 RESILIENT TILE FLOORINGS B. Related Sections: The following sections contain requirements that relate to this section. 1 Division 2 Section "Selective Demolition" for removal of existing floor finishes. 2. Division 9 Section "Resilient Wall Base and Accessories" for resilient wall base, reducer strips, and other accessories installed with resilient floor tiles. A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of product specified. C. Samples for verification purposes in full -size tiles of each different color and pattern of resilient floor tile specified, showing full range of variations expected in these characteristics. D Product certificates, in lieu of laboratory test reports when permitted by Architect, signed by manufacturer certifying that each product complies with requirements. E. Maintenance data for resilient floor tile, to include in Operating and Maintenance Manual specified in Division 1 1.4 QUALITY ASSURANCE A. Single -Source Responsibility for Floor Tile: Obtain each type, color, and pattern of tile from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work. B. Fire Performance Characteristics: Provide products with the following fire performance characteristics as determined by testing products per ASTM test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. 1 Critical Radiant Flux: 0 45 watts per sq. cm or more per ASTM E 648. 2. Smoke Density Less than 450 per ASTM E 662. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver tiles and installation accessories to Project site in original manufacturer's unopened cartons and containers each bearing names of product and manufacturer, Project identification, and shipping and handling instructions. B. Store flooring materials in dry spaces protected from the weather with ambient temperatures maintained between 50 deg F (10 deg C) and 90 deg F (32 deg C). MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS C. Store tiles on flat surfaces. Move tiles and installation accessories into spaces where they will be installed at least 48 hours in advance of installation. 1.6 PROJECT CONDITIONS A. Maintain a minimum temperature of 70 deg F (21 deg C) in spaces to receive tiles for at least 48 hours prior to installation, during installation, and for not less than 48 hours after installation. After this period, maintain a temperature of not less than 55 deg F (13 deg C). B. Do not install tiles until they are at the same temperature as the space where they are to be installed. C. Close spaces to traffic during tile installation. 1.7 SEQUENCING AND SCHEDULING A. Install tiles and accessories after other finishing operations, including painting, have been completed. 1.8 EXTRA MATERIALS A. Deliver extra materials to Owner Furnish extra materials matching products installed as described below packaged with protective covering for storage and identified with labels clearly describing contents. 1. Furnish not less than 5 percent of each class, wearing surface, color, pattern and size of resilient floor tile installed. PART 2 PRODUCTS PART 3- EXECUTION 2.1 RESILIENT TILE SECTION 09660 PAGE 2 RESILIENT TILE FLOORINGS A. Vinyl Composition Floor Tile: Products complying with ASTM F 1066, Composition 1 (non- asbestos formulated). B. Available Products: Refer to Volume 1 Project Drawings, Finish Schedule for resilient floor tile manufacturers, styles, and colors. 2.2 INSTALLATION ACCESSORIES A. Concrete Slab Primer Nonstaining type as recommended by flooring manufacturer B. Trowelable Underlayments and Patching Compounds: Latex modified, portland -cement based formulation provided or approved by tile manufacturer for applications indicated. C. Adhesives (Cements): Water resistant type recommended by tile manufacturer to suit resilient floor tile products and substrate conditions indicated. 3.1 EXAMINATION A. General. Examine areas where installation of tiles will occur, with Installer present, to verify that substrates and conditions are satisfactory for tile installation and comply with tile manufacturer's requirements and those specified in this Section. B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following: 1 1 1 1 1 1 1 1 1 1 1 1 1 r r 1 1 A f 1 1 1 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 09660 PAGE 3 RESILIENT TILE FLOORINGS 1. Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits of any kind. C. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. General. Comply with manufacturer's installation specifications to prepare substrates indicated to receive tile. B. Use trowelable leveling and patching compounds per tile manufacturer's directions to fill cracks, holes, and depressions in substrates. C. Remove coatings, including curing compounds, and other substances that are incompatible with flooring adhesives and that contain soap, wax, oil, or silicone, by using a terrazzo or concrete grinder, a drum sander, or a polishing machine equipped with a heavy -duty wire brush. D Broom or vacuum clean substrates to be covered by tiles immediately before tile installation. Following cleaning, examine substrates for moisture, alkaline salts, carbonation, or dust. E. Apply concrete slab primer, if recommended by flooring manufacturer, prior to applying adhesive. Apply according to manufacturer's directions. 3.3 INSTALLATION A. General. Comply with tile manufacturer's installation directions and other requirements indicated that are applicable to each type of file installation included in Project. B. Lay out tiles from center marks established with principal walls, discounting minor offsets, so tiles at opposite edges of room are of equal width. Adjust as necessary to avoid using cut widths at perimeter that equal less than one -half of a tile. Install tiles square with room axis, unless otherwise indicated. C. Match tiles for color and pattern by selecting tiles from cartons in same sequence as manufactured and packaged, if so numbered. Cut tiles neatly around all fixtures. Discard broken, cracked, chipped, or deformed tiles. 1 Lay tiles in pattern with respect to location of colors, patterns, and sizes as indicated on Drawings. D Where demountable partitions and other items are indicated for installing on top of finished tile floor, install tile before these items are installed. E. Scribe, cut, and fit tiles to butt tightly to vertical surfaces, permanent fixtures, built -in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. F Extend tiles into toe spaces, door reveals, closets, and similar openings. G. Maintain reference markers, holes, or openings that are in place or plainly marked for future cutting by repeating on finish flooring as marked on subfloor Use chalk or other nonpermanent marking device. H. Adhere tiles to flooring substrates without producing open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, or other surface imperfections in completed tile installation. MAHLUM NORDFORS McIONNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09660 PAGE 4 RESILIENT TILE FLOORINGS 1. Use full spread of adhesive applied to substrate in compliance with tile manufacturer's directions including those for trowel notching, adhesive mixing, and adhesive open and working times. J Hand roll tiles where required by tile manufacturer 3.4 CLEANING AND PROTECTION A. Perform the following operations immediately after completing tile installation. 1. Remove visible adhesive and other surface blemishes using cleaner recommended by tile manufacturers. 2. Sweep or vacuum floor thoroughly 3 Do not wash floor until after time period recommended by resilient floor tile manufacturer 4 Damp -mop tile to remove manufacturer's marks, black marks and soil. B. Protect flooring against mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. Use protection methods indicated or recommended by tile manufacturer 1. Cover sheet vinyl floor coverings with undyed, untreated building paper until inspection for Substantial Completion. 2. Do not move heavy and sharp objects directly over sheet vinyl floor coverings. Place plywood or hardboard panels over floor coverings and under objects while they are being moved. Slide or roll objects over panels without moving panels. 0 1997 Mahhan Nordfors McKinley Gordon END OF SECTION 09660 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Sheet vinyl floor coverings with fibrous backing. B. Related Sections: The following sections contain requirements that relate to this section. 1. Division 2 Section "Selective Demolition" for removal of existing floor finishes. 2. Division 9 Section "Resilient Wall Base and Accessories" for resilient wall base, reducer strips, and other accessories installed with resilient floor tiles. 1.3 DEFINITIONS SECTION 09666 PAGE 1 SHEET VINYL FLOOR A. Type II sheet vinyl floor coverings are those having wear layers with a minimum binder content of 34 percent. 1.4 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of product specified. C. Samples for verification purposes in form of manufacturer's color charts consisting of actual sections of sheet vinyl floor coverings showing full range of variations expected in these characteristics. D Product certificates, in lieu of laboratory test reports when permitted by Architect, signed by manufacturer certifying that each product complies with requirements. E. Maintenance data for sheet vinyl floor coverings, to be included in Operating and Maintenance Manual specified in Division 1. 1.5 QUALITY ASSURANCE A. Single -Source Responsibility for Sheet Vinyl Floor Coverings: Obtain each type, color, and pattern of sheet vinyl floor coverings from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work. B. Fire Performance Characteristics: Provide products with the following fire performance characteristics as determined by testing products per ASTM test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. 1 Critical Radiant Flux: 0 45 watts per sq. cm or more per ASTM E 648. 2. Smoke Density Less than 450 per ASTM E 662. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Inspection. Owner will engage independent, qualified inspector to monitor installation of sheet vinyl floor covering. Non compliance with the following specifications for material handling, preparation, installation, and finishing of sheet vinyl floor covering will be grounds for rejection of completed work. Contractor will be responsible for cost of replacement materials and removal and reinstallation sheet vinyl floor covering. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver sheet vinyl floor coverings and installation accessories to Project site in original manufacturer's unopened cartons and containers each bearing names of product and manufacturer, Project identification, and shipping and handling instructions B. Store flooring materials in dry spaces protected from the weather with ambient temperatures maintained between 50 deg F (10 deg C) and 90 deg F (32 deg C). C. Move sheet vinyl floor coverings and installation accessories into spaces where they will be installed at least 48 hours in advance of installation. 1.7 PROJECT CONDITIONS A. Maintain a minimum temperature of 70 deg F (21 deg C) in spaces to receive sheet vinyl floor coverings for at least 48 hours prior to installation, during installation, and for not less than 48 hours after installation. After this period, maintain a temperature of not less than 55 deg F (13 deg C). B. Do not install sheet vinyl floor coverings until they are at the same temperature as the space where they are to be installed. C. Close spaces to traffic during installation of sheet vinyl floor coverings. 1.8 SEQUENCING AND SCHEDULING 1.9 EXTRA MATERIALS PART 2- PRODUCTS A. Deliver extra materials to Owner Furnish extra materials matching products installed as described below packaged with protective covering for storage and identified with labels clearly describing contents. 1 Furnish not less than 10 linear feet for each 500 linear feet or fraction thereof, in roll form of each different composition, wearing surface, color, and pattern of sheet vinyl floor covering installed. A. Install sheet vinyl floor coverings and accessories after other finishing operations, including painting, have been completed. 2.1 SHEET VINYL FLOOR COVERINGS SECTION 09666 PAGE 2 SHEET VINYL FLOOR A. Type II Sheet Vinyl Floor Coverings: Products complying with ASTM F 1303 Type II (non- asbestos formulated). B. Available Products: Refer to Volume 1 Project Drawings, Finish Schedule for sheet vinyl floor covering manufacturers, styles, and colors. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09666 PAGE 3 SHEET VINYL FLOOR 2.2 INSTALLATION ACCESSORIES A. Concrete Slab Primer Nonstaining type as recommended by flooring manufacturer. B. Trowelable Underlayments and Patching Compounds: Latex modified, portland -cement -based formulation provided or approved by sheet vinyl floor covering manufacturer for applications Indicated. C. Adhesives (Cements): Water resistant, stabilized type as recommended by manufacturer to suit sheet vinyl floor coverings products and substrate conditions indicated. D Seam Sealer Formulation provided or approved by floor covering manufacturer for products indicated. 2.3 WATERPROOFING MEMBRANE A. Thin, load- bearing, flexible waterproofing system consisting of a self- curing liquid rubber polymer which is cold applied with an internal reinforcing fabric to form a seamless light duty waterproof membrane. 1. Available Products: 9235 waterproof membrane by Laticrete International, Inc. PART 3- EXECUTION 3.1 EXAMINATION A. General. Examine areas where installation of sheet vinyl floor covering will occur, with Installer present, to verify that substrates and conditions are satisfactory for installation and comply with manufacturer's requirements and those specified in this Section. B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following: 1 Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits of any kind. C. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. General. Comply with manufacturer's installation specifications to prepare substrates indicated to receive sheet vinyl floor coverings. B. Use trowelable leveling and patching compounds per tile manufacturer's directions to fill cracks, holes, and depressions in substrates. C. Remove coatings, including curing compounds, and other substances that are incompatible with flooring adhesives and that contain soap, wax, oil, or silicone, by using a terrazzo or concrete grinder, a drum sander, or a polishing machine equipped with a heavy -duty wire brush. D Broom or vacuum clean substrates to be covered by sheet vinyl floor coverings immediately before installation. Following cleaning, examine substrates for moisture, alkaline salts, carbonation, or dust. E. Apply concrete slab primer, if recommended by flooring manufacturer, prior to applying adhesive. Apply according to manufacturer's directions. F Apply waterproof membrane per manufacturer's directions at sloping floors to drain in HC Toilet/Shower rooms. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.3 INSTALLATION SECTION 09666 PAGE 4 SHEET VINYL FLOOR A. General. Comply with sheet vinyl floor covering manufacturer's installation directions and other requirements indicated that are applicable to each type of floor covering installation included in Project. B. Lay ottt sheet vinyl floor covering to comply with the following requirements: 1. Maintain uniformity of sheet vinyl floor covering direction. 2. Arrange for a minimum number of seams and place them in inconspicuous and low traffic areas, but in no case less than 6 inches away from parallel joints in flooring substrates. 3 Match edges of resilient floor coverings for color shading and pattern at seams. 4 Avoid cross seams. C. Where demountable partitions and other items are indicated for installing on top of finished tile floor, install tile before these items are installed. D Scribe, cut, and fit sheet vinyl floor coverings to butt tightly to vertical surfaces, permanent fixtures, built -in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. E. Extend sheet vinyl floor coverings into toe spaces, door reveals, closets, and similar openings. F Maintain reference markers, holes, or openings that are in place or plainly marked for future cutting by repeating on finish flooring as marked on subfloor Use chalk or other nonpermanent marking device. G. Adhere sheet vinyl floor covering by method approved by floor covering manufacturer 1 Produce completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, or other surface imperfections. 2. Comply with floor covering manufacturer's directions including those for trowel notching, adhesive mixing, and adhesive open and working times. H. Heat weld seams in sheet vinyl floor coverings as recommended by manufacturer Prepare, weld, and finish seams to produce a surface flush with adjoining sheets. I. Integral Flash Cove Base: Cove sheet vinyl floor coverings up vertical surfaces to form integral base of height indicated over cove support strip with top edge butted against and covered by cap molding. J Hand roll sheet vinyl floor coverings in both directions from center out to embed floor coverings in adhesive and eliminate trapped air At walls, door casings, and other locations where access by roller is impractical, press floor coverings firmly in place with flat bladed instrument. 3.4 CLEANING AND PROTECTION A. Perform the following operations immediately after installing sheet vinyl floor coverings: 1 Remove visible adhesive and other surface blemishes using cleaner recommended by floor covering manufacturers. 2. Sweep or vacuum floor thoroughly 3 Do not wash floor until after time period recommended by sheet vinyl floor covering manufacturer 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 4 Damp -mop tile to remove manufacturer's marks, black marks and soil. B. Protect flooring against mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. Use protection methods indicated or recommended by tile manufacturer. Cover sheet vinyl floor coverings with undyed, untreated building paper until inspection for Substantial Completion. 2. Do not move heavy and sharp objects directly over sheet vinyl floor coverings. Place plywood or hardboard panels over floor coverings and under objects while they are being moved. Slide or roll objects over panels without moving panels. 1 0 1997 Mahlum Nordfors McKinley Gordon SECTION 09666 PAGE 5 SHEET VINYL FLOOR END OF SECTION 09666 PART 1- GENERAL MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Resilient wall base. SECTION 09678 PAGE 1 RESILIENT BASE B. Related Sections: The following Sections contain requirements that relate to this Section: 1. Division 9 Section "Sheet Vinyl Floor Covering" 2. Division 9 Section "Resilient Tile Flooring." 3 Division 9 Section "Carpet." 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of product specified. C. Samples for verification purposes in manufacturer's standard sizes, but not less than 12 inches long, of each different color and pattern of product specified. 1.4 QUALITY ASSURANCE A. Single -Source Responsibility for Products: Obtain each type and color of product specified from a single source with resources to provide products of consistent quality in appearance and physical properties without delaying progress of the Work. B. Fire Performance Characteristics: Provide products with the following fire performance characteristics as determined by testing products per ASTM test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. 1 Critical Radiant Flux: 0 45 watts per sq. cm or more per ASTM E 648. 2. Smoke Density Less than 450 per ASTM E 662. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver products to Project site in original manufacturer's unopened cartons and containers, each bearing names of product and manufacturer, Project identification, and shipping and handling instructions. B. Store products in dry spaces protected from the weather with ambient temperatures maintained between 50 deg F (10 deg C) and 90 deg F (32 deg C). C. Move products into spaces where they will be installed at least 48 hours in advance of installation. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.6 PROJECT CONDITIONS A. Maintain a minimum temperature of 70 deg F (21 deg C) in spaces to receive products specified in this Section for at least 48 hours prior to installation, during installation, and for not less than 48 hours after installation. After this period, maintain a temperature of not less than 55 deg F (13 deg C). C. Close spaces to traffic during installation of products specified in this Section. 1.7 SEQUENCING AND SCHEDULING SECTION 09678 PAGE 2 RESILIENT BASE B. Do not install products until they are at the same temperature as that of the space where they are to be installed. A. Sequence installing products specified in this Section with other construction to minimize possibility of damage and soiling during remainder of construction period. 1.8 EXTRA MATERIALS A. Deliver extra materials to Owner. Furnish extra materials matching products installed as described below packaged with protective covering for storage, and identified with labels clearly describing contents. 1 Furnish not less than 10 linear feet for each 500 linear feet or fraction thereof of each different type and color of resilient wall base installed. PART 2- PRODIJCTS 2.1 MANUFACTURERS A. Acceptable Manufacturers: Refer to Room Finish Schedule and Interior Finish Drawing for style, color, and location of each type of Resilient Wall Base. 2.2 RESILIENT WALL BASE A. Color and Pattern. Refer to Room Finish Schedule and Interior Finish Drawing for style, color, and location of each type of Resilient Wall Base. B. Size: 6 inches high typical throughout. 2.3 INSTALLATION ACCESSORIES A. Concrete Slab Primer Nonstaining type as recommended by flooring manufacturer. B. Trowelable Underlayments and Patching Compounds: Latex modified, portland- cement based formulation provided or approved by flooring manufacturer for applications indicated. C. Adhesives: Water resistant type recommended by manufacturer to suit resilient flooring product and substrate conditions indicated. PART 3- EXECUTION 3.1 EXAMINATION A. Examine areas where installation of products specified in this Section will occur, with Installer present, to verify that substrates and conditions are satisfactory for installation and comply with manufacturer's requirements and those specified in this Section. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.2 PREPARATION SECTION 09678 PAGE 3 RESILIENT BASE A. General. Comply with manufacturer's installation specifications for preparing substrates indicated to receive products indicated. B. Use trowelable leveling and patching compounds per manufacturers directions to fill cracks, holes, and depressions in substrates. C. Remove coatings, including curing compounds, and other substances that are incompatible with flooring adhesives and that contain soap, wax, oil, or silicone, by using a terrazzo or concrete grinder, a drum sander, or a polishing machine equipped with a heavy -duty wire brush. D Broom or vacuum clean substrates to be covered inunediately before installing products specified in this Section. Following cleaning, examine substrates for moisture, alkaline salts, carbonation, or dust. E. Apply concrete slab primer, if reconunended by flooring manufacturer, prior to applying adhesive. Apply according to manufacturer's directions. 3.3 INSTALLATION A. General Install products specified in this Section using methods indicated according to manufacturer's installation directions. B. Apply resilient wall base to walls, columns, pilasters, casework, and other permanent fixtures in rooms and areas where base is required. Install wall base in lengths as long as practicable. Tightly adhere wall base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates. 1 On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient wall base with manufacturer's recommended adhesive filler material. 2. Install inside and exterior corners before installing straight pieces. 3 Form inside corners on job from straight pieces of maximum lengths possible by cutting an inverted V- shaped notch in toe of wall base at the point where corner is formed. Shave back of base where necessary to produce snug fit to substrate. 4 Form outside corners on job from straight pieces of ,maximum lengths possible by shaving back of base at point where bending will occur Remove a strip perpendicular to length of base and only deep enough to produce a snug fit without bends whitening or removal of more than half the thickness of wall base. C. Place resilient accessories so they are butted to adjacent materials of type indicated and bond to substrates with adhesive. Install reducer strips at edges of flooring that otherwise would be exposed. 3.4 CLEANING AND PROTECTION A. Perform the following operations immediately after completing installation. 1. Remove visible adhesive and other surface blemishes using cleaner recommended by manufacturers of resilient product involved. 2. Sweep or vacuum floor thoroughly 3 Do not wash floor until after time period recommended by manufacturer 4 Damp -mop resilient accessories to remove black marks and soil. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 0 1997 Malilum Nordfors McKinley Gordon SECTION 09678 PAGE 4 RESILIENT BASE B. Protect flooring against mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period. Use protection methods indicated or recommended by manufacturer of resilient product involved. 1. Cover resilient accessories on floors and stairs with undyed, untreated building paper until inspection for Substantial Completion. C. Clean products specified in this Section not more than 4 days prior to dates scheduled for inspections intended to establish date of Substantial Completion in each area of Project. Clean products using method recommended by manufacturer. END OF SECTION 09678 MAHLUM NORDFORS McKLNLEY GORDON SECTION 09680 PAGE 1 OLYMPIC MEMORIAL HOSPITAL CARPET 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes carpet, installation, and accessories. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of carpet material and installation accessory required. Submit written data on physical characteristics, durability resistance to fading, and flame resistance characteristics. C. Shop drawings showing layout and seaming diagrams Indicate pile or pattern direction and locations and types of edge strips. Indicate columns, doorways, enclosing walls or partitions, built -in cabinets, and locations where cutouts are required in carpet. Show installation details at special conditions. D Samples for verification purposes in manufacturer's standard size, showing full range of color, texture, and pattern variations expected. Prepare samples from same material to be used for the Work. Submit the following: 1 12- inch -square samples of each type of carpet material required. 2. 12 -inch -long samples of each type exposed edge stripping and accessory item. 1.4 QUALITY ASSURANCE A. Manufacturer's Qualification. Firm whose carpet materials comply with "Use of Materials Bulletin UM -44C" published by US Department of Housing and Urban Development (HUD) and are currently listed in HUD "Certified Products Directory" and so identified by imprint on back of carpet. B. Carpet Surface Burning Characteristics: Provide carpet identical to that tested for the following fire performance characteristics, per test method indicated below by UL or other testing and inspecting organizations acceptable to authorities having jurisdiction. Identify carpet with appropriate markings of applicable testing and inspecting organization. 1. Test Method: DOC FF 1 -70 2. Rating: Pass. 1.5 DELIVERY STORAGE, AND HANDLING A. Deliver materials to project site in original factory wrappings and containers, labeled with identification of manufacturer brand name, and lot number B. Store materials in original undamaged packages and containers, inside well ventilated area protected from weather, moisture, soilage, extreme temperatures, and humidity Lay flat, MAHLUM NORDFORS McIONLEY GORDON SECTION 09680 PAGE 2 OLYMPIC MEMORIAL HOSPITAL CARPET 2 MAIN /SURGERY ADDITIONS ALTERATIONS blocked off ground. Maintain minimum temperature of 68 deg F (20 deg C) at least three days prior to and during installation in area where materials are stored. 1 ;6 PROJECT CONDITIONS A. Substrate Conditions: No condensation within 48 hours on underside of 4-foot by 4 -foot polyethylene sheet, fully taped at perimeter to substrate. B. Substrate Conditions: pH of 9 or less when substrate wetted with potable water and Hydrion paper applied. 1.7 EXTRA MATERIALS A. Deliver extra materials to Owner. Furnish extra materials matching products installed as described below packaged with protective covering for storage and identified with labels describing contents. 1. Carpet: Before installation begins, furnish quantity of full width for each type of material equal to 5 percent of amount installed. PART 2- PRODIJCTS 2.1 GENERAL A. Colors and Patterns: Refer to Room Finish Schedule and Interior Finish Drawing for style, pattern, color, and location of each type of carpet. B. Available Products: Subject to compliance with requirements, provide products specified in Product Data Sheets at the end of this section. 2.2 ACCESSORIES A. Carpet Edge Guard: Extruded or molded heavy -duty vinyl or rubber of size and profile indicated; minimum 2- inch -wide anchorage flange; manufacturer's standard colors. B Seaming Cement: Hot -melt adhesive tape or similar product recommended by carpet manufacturer for taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams. C. Carpet Adhesive: Water resistant and nonstaining as recommended by carpet manufacturer to comply with flammability requirements for installed carpet. PART 3- EXECUTION 3.1 PREPARATION A. Clear away debris and scrape up cementitious deposits from concrete surfaces to receive carpet; apply sealer to prevent dusting. 3.2 INSTALLATION A. Comply with manufacturer's recommendations for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile. At doorways, center seams under door in closed position; do not place seams perpendicular to door frame, in direction of traffic through doorway Do not bridge building expansion joints with continuous carpet. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKTNLEY GORDON SECTION 09680 PAGE 3 OLYMPIC MEMORIAL HOSPITAL CARPET 2 MAIN /SURGERY ADDITIONS &.ALTERATIONS B. Extend carpet under removable flanges and furnishings and into alcoves and closets of each space. C. Provide cutouts where required, and bind cut edges where not concealed by protective edge guards or overlapping flanges. D Install carpet edge guard where edge of carpet is exposed; anchor guards to substrate. E. Install with pattern parallel to walls and borders. F Install carpet by trimming edges, butting cuts with seaming cement, and taping and/or sewing seams to provide sufficient strength for stretching and continued stresses during life of carpet. G. Fit sections of carpet prior to application of adhesive. Trim edges and butt cuts with seaming cement. H. Apply adhesive uniformly to substrate in accordance with manufacturer's instructions. Butt edges tight to form seams without gaps. Roll entire area lightly to eliminate air pockets and ensure uniform bond. 3.3 CLEANING A. Remove adhesive from carpet surface with manufacturer's recommended cleaning agent. B. Remove and dispose of debris and unusable scraps. Vacuum with commercial machine with face- beater element. Remove soil. Replace carpet where soil cannot be removed. Remove protruding face yarn. C. Vacuum carpet. 3.4 PROTECTION A. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and installer, to ensure carpet is not damaged or deteriorated at time of Substantial Completion. MAHLUM NORDFORS MclUNLEY GORDON SECTION 09680 PAGE 4 OLYMPIC MEMORIAL HOSPITAL CARPET 2 MAIN /SURGERY ADDITIONS ALTERATIONS PRODUCT DATA SHEET CARPET #1 A. Carpet Designation. CPT -1 B. Fiber Content: 100% BASF Zeftron® 2000 Solution Dyed Nylon C. Fiber Weight: 30 oz. /Square Yard D Construction. Micro -Weave E. Dye Method: Solution Dyed F Gauge: 5/64" G. Pile Height: 11/64' (1.72) x 1/8' 125) H. Average Pile Density 8120 I. Primary Backing: Woven polypropylene J Secondary Backing: The Enhancer® Class IV Plus K. Stitches Per Inch. 10.3 L. Performance Specifications: As follows: 1 Flammability Flooring Radiant Panel Test ASTM E-648, 372.NFPA 253 Class 1 2. Smoke Density Less than 450 N.B.S. smoke chamber test, ASTM -E-662 3 Colorfastness: 10 year colorfastness to light. Five year colorfastness to atmospheric contaminants. 4 Static Rating: Less than 3 0 KV Anti- static warranted for the life of the carpet. 5 Warranty 10 year wear warranty 6 Antimicrobial. The Inhibitor® Antimicrobial 7 Fluorochemical Treatment: DuPont fluorochemical treatment M. Product: Patcraft Radius 094 Formula with the Enhancer® Class IV backing MAHLUM NORDFORS MCKTNLEY GORDON SECTION 09680 PAGE 5 OLYMPIC MEMORIAL HOSPITAL CARPET 2 MAIN/SURGERY ADDITIONS ALTERATIONS PRODUCT DATA SHEET CARPET #2 A. Carpet Designation: CPT -2 B. Fiber Content: 61% DSDN, 26% Antron Legacy 13% Antron Lumena Nylon C. Fiber Weight: 22 oz. /Square Yard D Construction. Accuweave Patterned Loop E. Dye Method. Solution/Yam Dyed F Gauge: 1/12" G. Pile Height: 0 187" H. Average Pile Density 4235 I. Primary Backing: Synthetic J Secondary Backing: Powerbond Closed Cell Condensed Vinyl K. Performance Specifications: As follows: 1 Flammability Flooring Radiant Rating Panel ASTM E-648 Class 1 2. Smoke Density Less than 450, N.B.S. smoke chamber test, ASTM -E-662 3 Colorfastness: 10 year colorfastness to light. Five year colorfastness to atmospheric contaminants 4 Static Rating: Less than 1.3 KV 5 Warranty 15 year wear warranty L. Product: Collins Aikman CALYPSO 23605 Napa Valley Powerbond with Condensed Cushion MAHLUM NORDFORS McIUNLEY GORDON SECTION 09680 PAGE 6 OLYMPIC MEMORIAL HOSPITAL CARPET 2 MAIN /SURGERY ADDITIONS ALTERATIONS PRODUCT DATA SHEET CARPET #3 A. Carpet Designation. CPT -3 B. Fiber Content: 100% Antron Lumena Nylon with DuraTech Soil Resistant Technology C. Fiber Weight: 30 oz. /Square Yard D Construction. Patterned Loop E. Dye Method. Solution Dyed F Gauge: 1 /10' G. Pile Height: 0.250' H. Average Pile Density 4320 I. Primary Backing: 100% Reinforced Woven Polypropylene J Secondary Backing: Action Bac K. Performance Specifications: As follows: 1 Flammability Flooring Radiant Rating Panel ASTM E-648 Class 1 2. Smoke Density Less than 350, N.B.S. smoke chamber test, ASTM -E-662 3 Colorfastness: 10 year colorfastness to light. Five year colorfastness to atmospheric contaminants 4 Static Rating: Less than 3 0 KV 5 Warranty 10 year wear warranty L. Product: Atlas Cartecay 30 MAHLUM NORDFORS McKLNLEY GORDON SECTION 09680 PAGE 7 OLYMPIC MEMORIAL HOSPITAL CARPET 2 MAIN /SURGERY ADDITIONS ALTERATIONS PRODUCT DATA SHEET BACKING #2 A. Carpet Designation. CPT -2 B. Product: Powerbond Closed Cell Condensed Vinyl C. Foam Weight: 27.5 oz/sq. yd. D Thickness: 0.065 inches E. Density 35 lbs/cu. ft. F Compression Set: 10% maximum G. Compression Resistance: 29 lbs/sq. in. 25% (psi) minimum H. Product: Collins Aikman Powerbond 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 09680 MAHLUM NORDFORS McK1NLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09900 PAGE 1 PAINTING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation, painting, and finishing of exposed interior and exterior items and surfaces, and inspections and warranties. 1. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified under other Sections. 2. The words "paint," "painting," or "paint finishes" as used herein refer to all painted finishes, including clear and opaque liquid applications in addition to terms normally used. 3 The terms "Architectural Specifications Manual" and "ASM" as used in this section are defined to mean the Architectural Specifications Manual Painting, Wall covering, and Gypsum Wallboard Finishing, latest edition, published by Specification Services, 1001 SW Klickitat Way Suite 204 Seattle, WA 98134 phone (206) 343 -7774 4 Where "SSPC" is referred to, the standards of the Structural Steel Painting Council are used. B. Paint exposed surfaces, including equipment frames and housings, whether or not colors are designated in schedules, except where a surface or material is specifically indicated not to be painted or is to remain natural. Where an item or surface is not specifically mentioned, paint the same as similar adjacent materials or surfaces. If color or finish is not designated, the Architect will select from standard colors or finishes available. C. Painting is not required on prefinished items, finished metal surfaces, concealed surfaces, operating parts, and labels. 1. Prefinished items not to be painted include the following factory finished components: a. Metal toilet enclosures. b. Acoustic materials. c. Factory finished mechanical and electrical equipment (except exposed electrical wall panel doors and frames and factory primed equipment to be painted under this section.) d. Light fixtures. e. Distribution cabinets. 2. Concealed surfaces not to be painted include wall or ceiling surfaces in the following generally inaccessible areas: a. Furred areas. b. Pipe spaces. c. Enclosed ceiling spaces. 3 Finished metal surfaces not to be painted include: a. Anodized aluminum. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.3 SUBMITTALS SECTION 09900 PAGE 2 PAINTING b. Stainless steel. c. Chromium plate. d. Copper e. Bronze. f. Brass. 4 Labels: Do not paint over Underwriters Laboratories, Factory Mutual or other code required labels or equipment name, identification, performance rating, or nomenclature plates. D Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 5 Section "Metal Fabrications" for shop priming ferrous metal. 2. Division 6 Section "Interior Architectural Woodwork" for shop priming interior architectural woodwork. 3 Division 8 Section "Steel Doors and Frames" for shop priming steel doors and frames. 4 Divisions 15 and 16 Painting mechanical and electrical work other than rooftop units is specified in Divisions 15 and 16, respectively E. Materials for Maintenance: Leave 1 gallon of each type and color of paint at location designated by Owner. Obtain receipt from Owner's representative. Label each can for positive identification. A. General. Submit the following, to both the Architect and Specification Services Inc. according to Conditions of the Contract and Division 1 Specification Sections. Do not apply paint until the following are submitted and approved. B. Product data for each paint system specified, including block fillers and primers. 1 Provide the manufacturer's technical information including label analysis and instructions for handling, storage, and application of each material proposed for use. 2. List each material and cross reference the specific coating, finish system, and application. Identify each material by the manufacturer's catalog number and general classification. 3 Certification by the manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds (VOCs). C. Samples for Verification Purposes: Provide samples of each color and material to be applied, with texture to simulate actual conditions, on representative samples of the actual substrate. 1 Provide stepped samples, defining each separate coat, including block fillers and primers. Use representative colors when preparing samples for review Resubmit until required sheen, color, and texture are achieved. 2. Provide a list of material and application for each coat of each sample. Label each sample as to location and application. 3 Submit samples on the following substrates for the Architect's review of color and texture only a. Gypsum Wallboard: Provide two 12 -inch square samples of each color and material on gypsum wallboard. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS b. Painted Wood: Provide two 12- inch square samples of each color and material on hardboard. c. Stained or Natural Wood: Provide two 4 -by -8 -inch samples of natural and stained wood finish on actual wood surfaces. d. Ferrous Metal. Provide two 4- inch -square samples of flat metal and two 8 -inch -long samples of solid metal for each color and finish. 1.4 QUALITY ASSURANCE A. Standards: All work herein shall conform to the standards for materials and workmanship in the Architectural Specification Manual (ASM), latest edition, published by Specification Services Inc. 1001 SW Klickitat Way Suite 204 Seattle, WA 98134 phone (206) 343 -7774 B. Inspection Service: Include the total `Inspection and Contractor Warranty Program' as administered by Specification Services Inc. Payment for inspection and testing services is the responsibility of the Contractor C. Applicator Qualifications: Engage an experienced applicator who has completed painting system applications similar in material and extent to those indicated for the Project that have resulted in a construction record of successful in- service performance for at least 5 years. 1 Applicator shall be fully familiar with the Architectural Specification Manual. and shall have a current copy of the Architectural Specification Manual on file in their office. 2. Employ only qualified journeyman in this painting and decorating work. Apprentices may be employed on the project to work under the direction of qualified journeymen in accordance with trade regulations. D Single -Source Responsibility Provide primers and undercoat paint produced by the same manufacturer as the finish coats. 1.5 DELIVERY STORAGE, AND HANDLING SECTION 09900 PAGE 3 PAINTING A. Deliver materials to the job site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information. 1 Product name or title of material. 2. Product description (generic classification or binder type). 3 Manufacturer's stock number and date of manufacture. 4 Contents by volume, for pigment and vehicle constituents. 5 Thinning instructions. 6 Application instructions. 7 Color name and number B. Store materials not in use in tightly covered containers in a well ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition, free of foreign materials and residue. C. Protect from freezing. Keep storage area neat and orderly Remove oily rags and waste daily Take necessary measures to ensure that workers and work areas are protected from fire and health hazards resulting from handling, mixing, and application. MAHLUM NORDFORS McIONNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.6 JOB CONDITIONS A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 F (10 deg C) and 90 deg F (32 deg C). B. Apply solvent- thinned paints only when the temperature of surfaces to be painted and surrouhding air temperatures are between 45 deg F (7 deg C) and 95 deg F (35 deg C). C. Do not apply paint in snow rain, fog, or mist; or when the relative humidity exceeds 85 percent; or at temperatures less than 5 deg F (3 deg C) above the dew point; or to damp or wet surfaces. 1 Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by the manufacturer during application and drying periods. D Provide lighting level of at least 80 foot candles measured mid- height at substrate surface. E. Provide continuous ventilation and heating to prevent accumulation of hazardous fumes and to maintain surface and ambient temperatures within specified range for 24 hours before, during, and for 48 hours after application of finishes. F Do not work when dust, pollen, or insects are present. 1.7 WARRANTY A. Warranty period will extend for two years from the date of substantial completion. PART 2- PRODUCTS 2.1 MANUFACTURERS A. Use only the approved paint products of the paint manufacturers listed in the Architectural Specification Manual, chapter 7 Manufacturers' Product Listing. 2.2 PAINT MATERIALS SECTION 09900 PAGE 4 PAINTING A. Material Compatibility Provide block fillers, primers, finish coat materials, and related materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by the manufacturer based on testing and field experience. B. Material Quality Unless otherwise specified, furnish paint, varnish, stain, enamel, lacquer, fillers, and related products for prime and intermediate and finish coats of a type, brand, and manufacture listed in Chapters 5 6, and 7 of the Architectural Specification Manual, factory- labeled for positive identification. Materials not specifically noted in the Architectural Specification Manual and required for the work such as linseed oil, shellac, thinners, or other materials required for the work shall be of quality not less than required by applicable published federal or state specification standards and as manufactured by approved firms C. Mixing: Furnish paints ready -mixed unless otherwise specified, except field -mix coatings which are in paste or powder form, or to be field catalyzed, in accordance with the directions of its manufacturer Fully grind pigments to maintain a soft paste consistency in the vehicle during storage that can be dispersed readily and uniformly by paddle to a completely homogenous mixture ready for use with good flowing and brushing properties. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09900 PAGE 5 PAINTING D Colors: Match colors indicated by reference to drawings and finish schedules and to the manufacturer's standard color designations. E. Lead Content: Not more than 0 06 percent lead, based on total nonvolatile (dry -film) weight. This limitation is extended to surfaces in public areas and other surfaces readily accessible to children under 7 years of age PART 3 EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions under which painting will be performed for compliance with paint application requirements. Surfaces receiving paint must be thoroughly dry before paint is applied. 1. Do not begin to apply paint until unsatisfactory conditions have been corrected and surfaces are ready to receive the work under this section. 2. Start of painting will be construed as the Applicator's acceptance of surfaces and conditions within a particular area Unless otherwise specified hereinafter, the following surfaces are considered, under this section, as the responsibility of other trades: a. Shop prime coats of structural steel, miscellaneous metal, sheet metal, and other shop prime coated metal items except for minimal spot touch -up painting at field welds and surfaces abraded during their installation. b. Gypsum wallboard finishing of joints, moldings and fastenings. c. The condition of substrates to be painted or finished under this section which may adversely affect the painting work except minimal work normally performed by this trade. B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers. C. Notify the Architect about anticipated problems using the materials specified over substrates 'primed by others. 3.2 PREPARATION A. Inspector Notification. Notify the project inspector designated by Specifications Services Inc. before starting work under this Section. B. General. Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted, or provide surface- applied protection prior to surface preparation and painting. Remove these items, if necessary to completely paint the items and adjacent surfaces. Following completion of painting operations in each space or area, have items reinstalled by workers skilled in the trades involved. C. Cleaning: Before applying paint or other surface treatments, clean the substrates of substances that could impair the bond of the various coatings. Remove oil and grease prior to cleaning. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09900 PAGE 6 PAINTING D Surface Preparation: Clean and prepare surfaces to be painted in accordance with the ASM and according to the manufacturer's instructions for each particular substrate condition and as specified. 1. Provide barrier coats over incompatible primers or remove and re- prime. Notify Architect in writing about anticipated problems using the specified finish -coat material with substrates primed by others. 2. Cementitious Materials: Prepare concrete, concrete masonry block, cement plaster, and mineral -fiber- reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen, as required, to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation. a. Use abrasive blast cleaning methods if recommended by the paint manufacturer b. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application using a zinc sulfate wash solution. Do not use a zinc sulfate wash solution under a latex emulsion paint system. Do not paint surfaces where moisture content exceeds that permitted in manufacturer's printed directions. c. Clean concrete floors to be painted with a 5. percent solution of muriatic acid or other etching cleaner. Flush the floor with clean water to remove acid, neutralize with ammonia, rinse, allow to dry and vacuum before painting. d. Remove stains caused by weathering or corroding metals by washing with a sodium metasilicate solution after being thoroughly wetted with potable water, then let thoroughly dry 3 Wood. Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off. a. Scrape and clean small, dry seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Tint Filler to match stain when clear finishes are specified. Work filler well into grain and, before it has set, working perpendicular to the grain, wipe excess from the surface. Sand smooth when dried. b. Prime, stain, or seal wood to be painted immediately upon delivery Prime edges, ends, faces, undersides, and backsides of wood, including cabinets, counters, cases, and paneling. c. When transparent finish is required, backprime with spar varnish. d. Backprime paneling on interior partitions where masonry plaster, or other wet wall construction occurs on backside. e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately upon delivery f. Turn over to carpenters an adequate quantity of stain so that they may apply one brush coat of stain to jobsite cut ends and edges as installation proceeds. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 09900 PAGE 7 PAINTING 4 Ferrous Metals: Clean ungalvanized ferrous metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with recommendations of the Steel Structures Painting Council (SSPC). a. Blast steel surfaces clean as recommended by the paint system manufacturer and according to requirements of SSPC specification SSPC -SP 10. b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming. c. Touch up bare areas and shop applied prime coats that have been damaged. Wire- brush, clean with solvents recommended by the paint manufacturer, and touch up with the same primer as the shop coat. 5 Galvanized Surfaces: Clean galvanized surfaces with non petroleum -based solvents so that the surface is free of oil and surface contaminants Prepare surface as recommended by coatings manufacturer or apply one coat of etching type primer. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods. D Materials Preparation. Carefully mix and prepare paint materials according to manufacturer's directions. 1 Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue. 2. Stir material before application to produce a mixture of uniform density stir as required during application. Do not stir surface film into material. Remove film and, if necessary strain material before using. 3 Use only thinners approved by the paint manufacturer and only within recommended limits. E. Tinting: Tint each undercoat a lighter shade to facilitate identification of each coat where multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat. 3.3 APPLICATION A. General. Apply paint according to ASM and manufacturer's directions. Use applicators and techniques best suited for substrate and type of material being applied. B. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. 1. Paint colors, surface treatments, and finishes are indicated in the schedules and drawings. 2. Provide finish coats that are compatible with primers used. 3 The number of coats and the film thickness required are the same regardless of the application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer Sand between applications where sanding is required to produce a smooth even surface according to the manufacturer's directions. 4 Apply additional coats if undercoats, stains, or other conditions show through final coat of paint until paint film is of uniform finish, color, and appearance. Give special attention to ensure that surfaces, including edges, corners, crevices, welds, and exposed fasteners, receive a dry film thickness equivalent to that of flat surfaces. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 09900 PAGE 8 PAINTING 5 The term exposed surfaces includes areas visible when permanent or built -in fixtures, convector covers, covers for finned tube radiation, grilles, and similar components are in place. Extend coatings in these areas, as required, to maintain the system integrity and provide desired protection. 6. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before the final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only 7 Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, nonspecular black paint. 8. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. 9 Finish exterior doors on tops, bottoms, and side edges same as exterior faces. 10 Sand lightly between each succeeding enamel or varnish coat. 11. Omit primer on metal surfaces that have been shop primed and touch -up painted. 12. Hollow metal doors, door frames, louvers, and trim shall have paint finish spray applied. Touch up of these items shall be done with an airbrush. C. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration. 1. Allow sufficient time between successive coats to permit proper drying. Do not recoat until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and where application of another coat of paint does not cause the undercoat to lift or lose adhesion. D Application Procedures: Apply paints and coatings by brush, roller, spray or other applicators according to the manufacturer's directions. 1 Brushes: Use brushes best suited for the material applied. 2. Rollers: Use rollers of carpet, velvet back, or high -pile sheep's wool as recommended by the manufacturer for the material and texture required. 3 Spray Equipment: Use airless spray equipment with orifice size as recommended by the manufacturer for the material and texture required. E. Minimum Coating Thickness: Apply materials no thinner than the manufacturer's recommended spreading rate. Provide the total dry film thickness of the entire system as reconunended by the manufacturer F Prime Coats: Before applying finish coats, apply a'prime coat of material, as recommended by the manufacturer, to material that is required to be painted or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears, to ensure a finish coat with no burn through or other defects due to insufficient sealing. 1. For wood surfaces to receive paint or enamel finish, prime and backprime interior finish wood products before their installation by other trades with interior wood prime paint. 2. For wood surfaces to receive clear or transparent stain finish, prime and backprime faces, edges, and ends with first coat prior to its installation be other trades. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 09900 PAGE 9 PAINTING 3 For wood surfaces to receive varnish or lacquer finish, backprime with resin sealer or lacquer sealer, as applicable to varnish or lacquer system specified, prior to installation by other trades. G. Stipple Enamel Finish. Roll and redistribute paint to an even and fine texture. Leave no evidence of rolling such as laps, irregularity in texture, skid marks, or other surface imperfections. H. Pigmented (Opaque) Finishes: Completely cover to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable. I. Transparent (Clear) Finishes: Use multiple coats to produce a glass -smooth surface film of even luster. Provide a finish free of laps, cloudiness, color irregularity runs, brush marks, orange peel, nail holes, or other surface imperfections. 1. Provide satin finish for final coats. J Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not complying with specified requirements. 3.4 FIELD QUALITY CONTROL A. Alkali Content Tests: Where paints are to be applied, test concrete, masonry cement board, and plaster surfaces using litmus paper to test for high alkalinity conditions, in accordance with the provisions for high alkalinity tests as set forth in the Architectural Specification Manual. B. Substantial Moisture Content Testing 1 General. Prepare substrate to receive paint in conformance with the Architectural Specification Manual and manufacturer of painting materials. Substrate to meet maximum moisture content as listed below 2. Plaster and Wallboard. Maximum moisture content 17 percent. 3 Wood. Common stock boards and dimension lumber 19 percent. Detail architectural woodwork, standing and running trim, cabinets and casework, 7 percent average with a range permitted in individual pieces of from 5 to 10 percent. C. Testing 1 Painting material coats shall meet the requirements of the Architectural Specification Manual film thickness. 2. If test results show that material being used does not comply with specified requirements, the Contractor may be directed to a. Stop painting work and remove noncomplying paint. b. Repaint surfaces coated with rejected paint. c. Remove rejected paint from previously painted surfaces if, upon repainting with specified paint, the two coatings are incompatible. D Patching: Other than normal damage to surfaces by other trades requiring touchup or refinishing, after painting and finishing is completed in any one room or area, painting repair shall be done under this section but at the expense of the trade or trades causing the damage. MAHLUM NORDFORS McIQN LEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.5 CLEANING 3.6 PROTECTION SECTION 09900 PAGE 10 PAINTING A. Cleanup: At the end of each work day remove empty cans, rags, rubbish, and other discarded paint materials from the site. B. After completing painting, clean glass and paint spattered surfaces. Remove spattered paint by washing and scraping. Be careful not to scratch or damage adjacent finished surfaces. A. Protect work of other trades, whether being painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as acceptable to Architect. B. Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations. C. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. 3.7 SCHEDULE OF PAINTS A. General. Refer to Room Finish Schedule, and Interior Design Drawings for color selection and placement. The titles and code numbers used hereinafter refer to the Architectural Specification Manual, unless otherwise indicated, for type of surfaces, coating, grade, named products, and their manufacturers. B. Paint Grade: All paints are "premium grade" per the ASM unless otherwise noted. C. Moisture prone areas include toilet rooms, bathrooms, Shower rooms, Soiled Utility rooms, and Janitor's Closets Note: The following schedules are intended as a guide for the painted finish of a variety of substrates. Not all of the substrates listed will necessarily be found on the project site. For substrates not listed, finish per the recommendations in the Architectural Specification Manual. D Exterior Paint Schedule 1 Paint on Ferrous Non Galvanized Metal. a. Epoxy semi gloss; ASM Exterior Industrial 6 -D plus ASM SC4.2 Polyurethane top coat 2. Paint on Galvanized, Zinc coated Metals: a. Alkyd semi gloss; ASM Ext. 14 -A 3 Paint on Stucco, Concrete, Concrete Masonry Units a. Alkyd satin; ASM Ext. 6 -A E. Interior Paint Schedule 1. Paint on Concrete Ceilings, Columns, Walls: a. Latex Enamel eggshell; ASM Int. 5 -B 2. Paint on Concrete Ceilings, Columns, Walls in Moisture Prone Areas: 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 09900 PAGE 11 PAINTING a. Alkyd Enamel semi gloss; ASM Int. 3 -F 3 Paint on Concrete Floors and Stairs: a. Alkyd semi gloss; ASM Int. 5 -A 4 Paint on Gypsum Wallboard and Plaster Ceilings and Walls: a. Latex Enamel eggshell; ASM Int. 3 -B 5 Paint on Gypsum Wallboard Ceilings and Walls in moisture prone areas: a. Latex Enamel semi gloss; ASM Int. 3 -B 6. Paint on Aluminum Ducts, Louvers, Trim: a. Latex Enamel satin; ASM Int. 16 -A 7 Paint on Miscellaneous Non Galvanized Ferrous Metal Railings, Doors and Frames, Structural Steel, Convectors, Trim, Ladders, Stairs: a. Latex Enamel satin; ASM Int. 12 -B (premium grade in public areas and custom grade at storage and building service areas.) Finish to be spray applied. 8. Paint on Galvanized, Zinc coated Metals: a. Alkyd Enamel semi gloss; ASM Int. 13 -A 9 Paint on Woodwork and Millwork: a. Latex Enamel satin; ASM Int. 1 -B 10 Transparent Finish on Woodwork and Millwork: a. Lacquer satin, ASM Int. 1 -H 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 09900 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Vinyl wall covering. SECTION 09950 PAGE 1 WALLCOVERINGS B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 9 Section "Gypsum Board Assemblies" for installation and preparation of substrates. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for each type of product specified. Include data on physical characteristics, durability fade resistance, and flame resistance characteristics. C. Shop Drawings showing location and extent of each wall covering type. Indicate seams and termination points. D Samples for verification in sets for each color, texture, and pattern specified, showing the full range of variations expected in these characteristics. 1 Wall Covering Material. Full -width sample, not less than 36 inches long, from dye lot used for the Work. a. Submit sample with specified treatments applied. b. Mark top and face of material. c. Show complete pattern repeat. E. Schedule of wall coverings using same room designations indicated on Drawings. F Product certificates signed by manufacturers of wall coverings certifying that their products comply with specified requirements. G. Maintenance data for wall covering to include in the operation and maintenance manual specified in Division 1 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer who has completed 5 projects similar in material, design, and extent to that indicated for this Project and with a record of successful in- service performance. B. Fire Test Response Characteristics: Provide wall coverings with the following surface burning characteristics as determined by testing identical products per ASTM E 84 by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1. Flame Spread: 25 or less. 2. Smoke Developed: 450 or less. 1.6 EXTRA MATERIALS PART 2- PRODUCTS 2.1 MANUFACTURERS SECTION 09950 PAGE 2 WALLCOVERINGS 1.5 PROJECT CONDITIONS A. Space enclosure and Environmental Limitations: Do not install wall covering until space is enclosed and weatherproof, wet -work in space is completed and nominally dry work above ceilings is complete, and ambient temperature and humidity conditions are and will be continuously maintained at values near those indicated for final occupancy B. Lighting: Do not install wall covering until a lighting level of not less than 15 foot candles is provided on the surfaces to receive wall covering. C. Ventilation. Provide continuous ventilation during installation and for not less than the time recommended by the wall covering manufacturer for full drying or curing. A. Furnish extra materials described below before installation begins, that match products installed, are packaged with protective covering for storage, and are identified with labels describing contents. 1 Rolls of Wall Covering Material. Full-size units equal to 5 percent of amount of each type installed. A. Available Products: Refer to Volume 1 Project Drawings, Room Finish Schedule for wall covering manufacturers, styles, patterns, and colors. 2.2 ADHESIVES A. General. Mildew- resistant, nonstaining adhesive, for use with specific wall covering and substrate application, as recommended by wall covering manufacturer 2.3 ACCESSORIES A. Wall Liner Non woven, synthetic underlayment and adhesive as recommended by wall covering manufacturer Provide at existing walls where substrate cannot be adequately prepared for installation. PART 3- EXECUT!ON 3.1 EXAMINATION A. Examine substrates for compliance with requirements for moisture content and other conditions affecting performance of Work of this Section. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Comply with manufacturer's written instructions for surface preparation. B. Clean substrates of substances that could impair wall covering's bond, including mold, mildew oil, grease, incompatible primers, and dirt. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.3 INSTALLATION, GENERAL 0 1997 Mahlum Nordfors Smith Gordon SECTION 09950 PAGE 3 WALLCOVERINGS C. Prepare substrates to achieve a smooth, dry clean surface free of flaking, unsound coatings, cracks, and defects. 1 Painted Surfaces: Treat areas susceptible to pigment bleeding. 2. Metals: If not factory primed, clean and apply rust inhibitive zinc primer. 3 Moisture Content: Maximum of 5 percent on new plaster, concrete, and concrete masonry units when tested with an electronic moisture meter. 4 Prime new gypsum board with primer recommended by wall covering manufacturer. 5 Allow new plaster to cure. Treat areas of high alkalinity D Check painted surfaces for pigment bleeding. Sand gloss, semigloss, and eggshell finishes with fine sandpaper. E. Install wall liner, with no gaps or overlaps, where required by wall covering manufacturer Form smooth wrinkle -free surface for finished installation. Do not begin wall covering installation until wall liner has dried. F Acclimatize wall covering materials by removing them from packaging in the installation areas not less than 24 hours before installation. A. General. Comply with wall coverings manufacturers' written installation instructions applicable to products and applications indicated, except where more stringent requirements apply B. Cut wall covering panels in roll number sequence. Change run numbers at partition breaks and corners only C. Install wall covering with no gaps or overlaps. D Match pattern 72 inches above finish floor E. Install seams vertical and plumb at least 6 inches from outside corners and 3 inches from inside corners. No horizontal seams. F Remove air bubbles, wrinldes, blisters, and other defects. G. Trim edges for color uniformity pattern match, and tight closure at seams and edges. Butt seams. 3.4 CLEANING A. Remove excess adhesive at finished seams, perimeter edges, and adjacent surfaces. B. Use cleaning methods recommended by wall covering manufacturer. C. Replace strips that cannot be cleaned. END OF SECTION 09950 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Porcelain enamel markerboards. 2. Combination porcelain enamel markerboards natural -cork tackboards. 3 Fabric wrapped tackboards B. Related work specified elsewhere includes: 1. Blocking: Division 6 Section "Rough Carpentry' 2. Fabric for tack boards: Volume 2 Project Drawings, Finish Schedule 1.3 SUBMITTALS A. Product Data: For each type of visual display board indicated. 1.4 QUALITY ASSURANCE A. Source Limitations: Obtain visual display boards through one source from a single manufacturer B. Product Options: Drawings indicate size, profiles, and dimensional requirements of visual display boards and are based on the products indicated. Other manufacturers' products with equal performance characteristics may be considered. Refer to Division 1 Section "Substitutions." 1 Do not modify intended aesthetic effects, as judged solely by Architect, except with Architect's approval and only to the extent needed to comply with performance requirements. Where modifications are proposed, submit comprehensive explanatory data to Architect for review 1.5 PROJECT CONDITIONS A. Verify conditions at site affecting work. Allow for trimming and fitting wherever taking field measurements. PART 2- PRODUCTS 2.1 MANUFACTURERS SECTION 10100 PAGE 1 VISUAL DISPLAY BOARDS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: 1 Porcelain Enamel Markerboards: a. Alliance Wall as distributed by PBS Supply Inc. b. Claridge Products and Equipment, Inc. c. Greensteel, Inc. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Tackboard Cork: a. Claridge Products and Equipment, Inc. b. Greensteel, Inc. 2.2 MATERIALS A. Porcelain Enamel Markerboards: Balanced, high- pressure laminated, porcelain enamel markerboards of 3 -ply construction consisting of face sheet, core material, and backing. 1 Face Sheet: 0 024 -inch enameling grade- steel especially processed for temperatures used in coating porcelain on steel. Coat exposed face and edges with a 3-coat process consisting of primer ground coat, and color cover coat. Coat concealed face with a 2- coat process consisting of primer and ground coat. Fuse cover and ground coats to steel at manufacturer's standard firing temperatures, but not less than 1200 deg F a. Cover Coat: Provide manufacturer's standard, light colored, special writing surface with gloss finish intended for use with erasable dry markers. 2. Core: 3/8- inch thick, particleboard core material complying with requirements of ANSI A208.1, Grade 1 -M -1. 3 Backing Sheet: 0 005- inch thick, aluminum foil sheet backing. 4 Laminating Adhesive: Manufacturer's standard, moisture resistant, thermoplastic -type adhesive. B. Natural -Cork Tackboards: Single- layer, 1/4- inch thick, seamless, compressed fine grain, bulletin board quality natural -cork sheet; face sanded for natural finish; complying with MS MIL -C- 15116, Type II. C. Fabric Wrapped Tackboards: Frameless, fabric wrapped boards with 1/4 inch thick fine textured cork laminated to 1/4 inch fiberboard. Fabric edges fully wrapped. Size as indicated on drawings. 2.3 FABRICATION SECTION 10100 PAGE 2 VISUAL DISPLAY BOARDS A. Porcelain Enamel Markerboards: Laminate facing sheet and backing sheet to core material under pressure with manufacturer's recommended flexible, waterproof adhesive. B. Assembly Provide factory- assembled markerboard units. PART 3 EXECUTION 3.1 EXAMINATION A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of work will be construed as acceptance of conditions. 3.2 PREPARATION A. Assure that adequate blocking has been provided in the walls where units are to be installed. 3.1 INSTALLATION A. Deliver factory -built visual display boards completely assembled in one piece without joints, where possible. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 10100 PAGE 3 VISUAL DISPLAY BOARDS B. Install units in locations and at mounting heights indicated and according to manufacturer's written instructions. Keep perimeter lines straight, plumb, and level. Provide grounds, clips, backing materials, adhesives, brackets, anchors, trim, and accessories necessary for complete installation. C. Attach Fabric Wrapped Tackboards to walls and casework with full coverage coating of Iinoleum paste. 3.2 ADJUSTING AND CLEANING A. Verify that accessories required for each unit have been properly installed and that operating units function properly B. Clean units according to manufacturer's written instructions. 0 1997 Mahlum Nordfors Smith Gordon END OF SECTION 10100 1 1 4 1 1 1 1 1 I 1 1 F 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Cubicle and privacy curtain tracks and accessories. 2. Cubicle curtains 3 IV tracks SECTION 10190 PAGE 1 CUBICLES B. Related Sections: The following Sections contain requirements that relate to this Section: 1 Division 6 "Rough Carpentry" for backing. 2. Division 9 Section "Acoustical Panel Ceilings." 3 Division 10 Section `Toilet and Bath Accessories' for shower rods. 1.3 SUBMITTALS A. General. Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B Product data for each type of cubicle curtain, track, and accessory specified. C Samples for verification for each curtain fabric indicated. 1.4 QUALITY ASSURANCE A. Single Source Responsibility Obtain track, carriers, and accessories from one source of a single manufacturer 1.5 PROJECT CONDITIONS A. Verify conditions at site affecting work to ensure the best installation per industry standards. Notify Architect of any conflicts with light fixtures, diffusers, or other ceiling mounted items. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1 ARNCO 2. Capital. 3 Kirsch. 4 Others as approved by addendum B. Quality Standard Product: Kirsch series 9600 MAHLUM NORDFORS McKINLEY GORDON SECTION 10190 PAGE 2 OLYMPIC MEMORIAL HOSPITAL CUBICLES 2 MAIN /SURGERY ADDITION ALTERATIONS 2.2 CEILING TRACK AND ACCESSORIES A. Cubicle Curtain and IV Ceiling Track: Kirsch 9600 series, 6063 -T -5 anodized aluminum extruded channel. All curves bent from one continuous piece. 1. Kirsch 9616 Roller type carriers with nylon wheels and nickel plated hook. 2. Provide all bends, splices, end stops, installation. PART 3- EXECUTION 3.1 EXAMINATION 3.3 ADJUSTING A. Adjust to ensure smooth, easy operation of carriers. 3.4 CLEANING B. Do not install cubicle curtains until after final cleaning of project site. 0 1997 Mahlum Nordfors McKinley Gordon and other components required for a complete 3 Provide carriers in sufficient quantities carriers at each IV track. 2.3 CUBICLE CURTAINS A. Material. 100% flame resistant polyester with nylon mesh for carrier attachment. B. Width. 72 inches C. Manufacturer Refer to Volume 2 Project Drawings, Finish Plan and Schedules manufacturer, style, pattern, and color to support cubicle curtains and minimum of two A. Examine ceiling, blocking, and support backing to determine that conditions are acceptable to receive the work of this section. B. Do not proceed with installation until unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Install per project drawings and manufacturer's installation standards. B. Install a complete assembly true and with tight joints, and secure fasteners tightly C. Do not install tracks in a manner that interferes with the removal of acoustic ceiling panels, light fixtures or bulbs. Do not install tracks across diffusers. J for A. Remove surplus materials, rubbish, and debris resulting from curtain track installation upon completion of work and leave areas of installation in neat, clean condition. END OF SECTION 10190 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1 Fixed metal wall louvers. 1.3 DEFINITIONS SECTION 10200 PAGE 1 LOUVERS AND VENTS B. Related Sections: The following Sections contain requirements that relate to this Section. 1 Division 7 Section "Joint Sealants" for sealants installed in perimeter joints between louver frames and adjoining construction. 2. Division 8 Section "Standard Steel Doors and Frames" for louvers in hollow metal doors and frames. 3 Division 15 Section "Metal Ductwork" for ductwork connected to metal wall louvers. A. Louver Terminology Refer to Air Movement and Control Association (AMCA) 501 for definitions of terms for metal louvers not otherwise defined m this Section or in referenced standards. 1.4 PERFORMANCE REQUIREMENTS A. Structural Performance: Engineer fabricate, and install exterior metal wall louvers to withstand the effects of loads and stresses from wind and normal thermal movement without evidencing permanent deformation of louver components including blades, frames, and supports; noise or metal fatigue caused by louver blade rattle or flutter or permanent damage to fasteners and anchors. 1 Wind Load: Uniform pressure (velocity pressure) of 20 lbf per sq. ft. (960 Pa), acting inwards or outwards. 2. Normal thermal movement is defined as that resulting from the .following maximum change (range) in ambient temperature. Base design calculations on actual surface temperatures of metals due to both solar heat gain and nighttime sky heat loss. a. Temperature Change (Range) -20 deg F to +100 deg F B Air- Performance, Water Penetration, and Air Leakage Ratings: Provide louvers complying with performance requirements indicated as demonstrated by testing manufacturer's stock units of height and width indicated. Test units according to AMCA 500 1. Perform testing on unpainted, cleaned, degreased units. 2. Perform water penetration testing on louvers without screens. 1.5 SUBMITTALS A. General. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B Product data for each type of product specified. MAHLUM NORDFORS McIaNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 QUALITY ASSURANCE SECTION 10200 PAGE 2 LOUVERS AND VENTS C. Shop drawings of louver units and accessories. Include plans, elevations, sections, and details showing profiles, angles, and spacing of louver blades; unit dimensions related to wall openings and construction; free areas for each size indicated; profiles of frames at jambs, heads, and sills; and anchorage details and locations. 1. For installed products indicated to comply with certain design loadings, include 'structural analysis data sealed and signed by the qualified professional engineer who was responsible for their preparation. D Product test reports evidencing compliance of units with performance requirements indicated. E. Product certificates signed by louver manufacturers certifying that their products comply with the specified requirements and are licensed to bear the AMCA seal based on tests made according to AMCA 500 and complying with the AMCA Certified Ratings Program. A. Single -Source Responsibility Obtain louvers and vents from one source and by a single manufacturer where alike in one or more respects regarding type, design, and factory- applied color finish. B. Welding Standards: Comply with applicable provisions of D1.2 "Structural Welding Code— Aluminum," and D1.3 "Structural Welding Code—Sheet Steel. 1 Certify that each welder has satisfactorily passed AWS qualification tests for welding processes involved and, if pertinent, has undergone recertification. C. SMACNA Standard. Comply with SMACNA "Architectural Sheet Metal Manual" recommendations for fabrication, construction details, and installation procedures. 1.7 PROJECT CONDITIONS A. Field Measurements: Check actual louver openings by accurate field measurements before fabrication, and show recorded measurements on final shop drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: 1 Louvers: a. Airline Products Co. b. Aimlite Co. c. Airstream Products Div Penn Ventilator Co. Inc. d. All -Lite Louver Co. e. American Warming and Ventilating, Inc. f. Arrow United Industries. g. Construction Specialties, Inc. h. Greenheck Fan Corp. i. Industrial Louvers, Inc. MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 10200 PAGE 3 LOUVERS AND VENTS j. Reliable Metal Products, Div of Hart Cooley Inc. k. Ruskin Mfg. Tomkins Industries, Inc. 2.2 MATERIALS A. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), Alloy 6063 -T5 or T -52. B. Aluminum Sheet: ASTM B 209 (ASTM B 209M), Alloy 3003 or 5005 with temper as required for forming, or as otherwise recommended by metal producer to produce required finish. C. Fasteners: Of same basic metal and alloy as fastened metal or 300 series stainless steel, unless otherwise indicated. Do not use metals that are corrosive or incompatible with joined materials. 1 Use types and sizes to suit unit installation conditions. 2. Use Phillips flat -head screws for exposed fasteners, unless otherwise indicated. D Anchors and Inserts: Of type, size, and material required for type of loading and installation indicated. Use nonferrous metal or hot-clip galvanized anchors and inserts for exterior installations and elsewhere as required for corrosion resistance. Use toothed steel or expansion bolt devices for drilled -in -place anchors. E. Bituminous Paint: Cold- applied asphalt mastic complying with SSPC -Paint 12 except containing no asbestos fibers. 2.3 FABRICATION, GENERAL A. General. Fabricate louvers and vents to comply with requirements indicated for design, dimensions, materials, joinery and performance. B Assemble louvers in shop to minimize field splicing and assembly Disassemble units as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. C. Maintain equal louver blade spacing to produce uniform appearance. D Fabricate frames, including integral sills, to fit in openings of sizes indicated, with allowances made for fabrication and installation tolerances of louvers, adjoining construction, and perimeter sealant joints. E. Include supports, anchorages, and accessories required for complete assembly F Join frame members to one another and to fixed louver blades as follows, unless otherwise indicated or size of louver assembly makes bolted connections between frame members necessary 1 With fillet welds, ,concealed from view or mechanical fasteners; or a combination of these methods; as standard with louver manufacturer 2.4 FIXED, EXTRUDED ALUMINUM WALL LOUVERS A. Horizontal, Drainable, Fixed -Blade Louvers: Extruded aluminum frames and louver blades, designed to collect and drain water to exterior at sill by means of gutters in front edges of blades and channels in jambs and mullions, complying with the following requirements: 1 Louver Depth. 4 inches (100 mm), unless otherwise indicated. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 10200 PAGE 4 LOUVERS AND VENTS 2. Frame Thickness: 0 081 inch (2.06 mm), unless otherwise indicated. 3 Blade Thickness: 0 081 inch (2.06 min), unless otherwise indicated. 4 Performance Requirements: As follows, determined by testing units 48 inches (1220 mm) wide by 48 inches (1220 mm) high per AMCA 500• a. Free Area. Not less than 8 0 sq. ft. b. Static Pressure Loss: Not more than 0.21 inch wg at an airflow of 1072 fpm free area intake velocity c. Water Penetration. Not more than 0 01 oz. per sq. ft. of free area at an airflow of 1072 fpm free area velocity when tested for 15 minutes. 5 AMCA Seal. Mark units with the AMCA Certified Ratings Seal. 2.5 LOUVER SCREENS A. General. Provide each exterior louver with louver screens complying with the following requirements: 1. Screen Location for Fixed Louvers: Interior face, unless otherwise indicated. 2. Screening Type: Bird screening, unless otherwise indicated. B. Secure screens to louver frames with stainless -steel machine screws, spaced 6 inches (150 mm) maximum from each corner and at 12 inches (300 mm) o.c. between. C. Louver Screen Frames: Fabricate screen frames with mitered corners to louver sizes indicated and to comply with the following requirements: 1 Metal. Same kind and form of metal as indicated for louver frames to which screens are attached. a. Reinforce extruded aluminum screen frames at corners with clips. 2. Finish. Mill finish, unless otherwise indicated. 3 Type: Non rewireable, U- shaped frames for permanently securing screen mesh. D Louver Screening for Aluminum Louvers: Fit aluminum louver screen frames with screening covering louver openings and complying with the following requirements: 1 Bird Screening: I /2- inch square mesh formed with 0 063 inch diameter aluminum wire. 2.6 FINISHES, GENERAL A. Comply with NAAMM "Metal Finishes Manual" for recommendations relative to applying and designating finishes. B Finish louvers after assembly 2.7 ALUMINUM FINISHES A. Finish designations prefixed by AA conform to the system established by the Aluminum Association for designating aluminum finishes. B High Performance Organic Coating Finish. AA- C12C42R1x (Chemical Finish. cleaned with inhibited chemicals; Chemical Finish. acid chromate- fluoride phosphate conversion coating; Organic Coating: as specified below). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturer's instructions. r r 1 r MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 1 Fluoropolymer 2 -Coat Coating System. Manufacturer's standard 2 -coat, thermocured system composed of specially formulated inhibitive primer and Fuoropolymer color topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight; complying with AAMA 605.2. a. Color and Gloss: As selected by Architect from manufacturer's full range of choices for color and gloss. PART 3 EXECUTION SECTION 10200 PAGE 5 LOUVERS AND VENTS l 3.1 PREPARATION A. Coordinate setting drawings, diagrams, templates, instructions, and directions for installation of anchorages that are to be embedded in concrete or masonry construction. Coordinate delivery of such items to Project site. 3.2 INSTALLATION A. Locate and place louver units plumb, level, and at indicated alignment with adjacent work. B. Use concealed anchorages where possible. Provide brass or lead washers fitted to screws where required to protect metal surfaces and to make a weathertight connection. C. Form closely fitted joints with exposed connections accurately located and secured. D Provide perimeter reveals and openings of uniform width for sealants and joint fillers, as indicated. E. Repair finishes damaged by cutting, welding, soldering, and grinding operations required for fitting and jointing. Restore finishes so there is no evidence of corrective work. Return items that cannot be refinished in the field to the shop, make required alterations, and refinish entire unit, or provide new units. F Install concealed gaskets, flashings, joint fillers, and insulation, as louver installation progresses, where required to make louver joints weathertight. Comply with Division 7 Section "Joint Sealants" for sealants applied during installation of louver 3.3 ADJUSTING AND PROTECTION A. Protect louvers and vents from damage of any kind during construction period including use of temporary protective coverings where needed and approved by louver manufacturer Remove protective covering at time of Substantial Completion. B. Restore louvers and vents damaged during installation and construction period, so that no evidence remains of correction work. If results of restoration are unsuccessful, as judged by Architect, remove damaged units and replace with new units. 1. Clean and touch up minor abrasions in finishes with air -dried coating that matches color and gloss of, and is compatible with, factory applied finish coating. 3.4 CLEANING A. Periodically clean exposed surfaces of louvers and vents that are not protected by temporary covering to remove fingerprints and soil during construction period. Do not let soil accumulate until final cleaning. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 0 1997 Mahlum Nordfors McKinley Gordon SECTION 10200 PAGE 6 LOUVERS AND VENTS B. Before final inspection, clean exposed surfaces with water and a mild soap or detergent not harmful to finishes. Rinse surfaces thoroughly and dry f END OF SECTION 10200 L 1 1 i 1 1 1 r i 1 f 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary bonditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of wall surface protection systems: 1 Wall protection systems, including: a. Impact resistant wall covering. b. Rub Rails and Crash Rails c. Corner guards d. Bumper guards. 1.3 SUBMITTALS SECTION 10265 PAGE 1 WALL SURFACE PROTECTION SYSTEMS 2 A. General. Submit the following in accordance with Conditions of the Contract and Division 1 Specification Sections. B. Product data for each wall surface protection system component and installation accessory required, including installation methods for each type of substrate. Provide written data on each required component including physical characteristics, such as durability resistance to fading, and flame resistance. C. Shop drawings showing locations, extent, and installation details of wall and corner guards, and other protection systems. Show methods of attachment to adjoining construction. D Samples for Initial Selection. For initial selection of color, pattern and surface texture, provide the manufacturer's standard color chips consisting of actual sections of each vinyl plastic material required showing the full range of materials, colors, and textures available. E. Product test reports from a qualified independent testing laboratory showing compliance of wall surface protection system components with requirements indicated based on tests performed by the laboratory within the past five years. F Maintenance data for wall surface protection system components for inclusion in the Operating and Maintenance Manuals specified in Division 1 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has previously installed wall surface protection systems similar in material, design, and extent to the systems indicated for this Project. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS B. Fire Performance Characteristics: Provide wall surface protection system components that are identical to those tested in accordance with ASTM E 84 for the fire performance characteristics indicated below Identify wall surface protection system components with appropriate markings from the testing and inspection organization. 1 Flame Spread: 25 or less. 2. 'Smoke Developed: 450 or less. C. Impact Strength. Provide wall surface protection system components with a minimum impact resistance of 25 4 ft. lbs per sq. ft. when tested in accordance with ASTM D 256 (Izod impact, ft. lbs per inch notch). D Single Source Responsibility Obtain each color grade, finish, and type of wall surface protection system component from a single source with resources to provided products of consistent quality in appearance and physical properties without delaying progress of the Work. E. Design Criteria. The drawings indicate the size, profile and dimensional requirements of wall surface protection system components required and are based on the specific types and models indicated. Wall surface protection system components by other manufacturers may be considered provided deviations in dimensions and profiles are minor and do not change the design concept as judged by the Architect. The burden of proof of equality is on the proposer 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to Project site in original factory wrappings and containers, clearly labeled with identification of manufacturer brand name, quality or grade, and fire hazard classification. 1.6 MAINTENANCE A. Maintenance Instructions: Provide the manufacturer's instructions for maintenance of installed work. Include recommended methods and frequency for maintaining optimum condition under anticipated traffic and use conditions. Include precautions against cleaning materials and methods that may be detrimental to finishes and performance. PART 2- PRODIJCTS 2.1 MANUFACTURERS SECTION 10265 PAGE 2 WALL SURFACE PROTECTION SYSTEMS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products for wall surface protection which may be incorporated into the Work include, but are not limited to, the following: 1 Impact Resistant Wall Covering a. Korogard by RJF International b. Acrovyn c. Others as approved by addendum 2. Rub Rails and Crash Rails a. Korogard by RJF International 1 i 1 i 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS b. Acrovyn c. Others as approved by addendum 3 Corner Guards a. Korogard by RJF International b. Acrovyn c. Others as approved by addendum 4 Bumber Guard Inserts at Handrails a. Korogard by RJF International b. Others as approved by addendum 2.2 MATERIALS SECTION 10265 PAGE 3 WALL SURFACE PROTECTION SYSTEMS A. Rigid Plastic Material. Extruded, textured, chemical- and stain resistant, high- impact, polyvinyl chloride (PVC) or acrylic modified vinyl plastic, thickness as indicated. Comply with specified requirements of ASTM D 256 for impact resistance and ASTM E 84 for flame spread and smoke developed characteristics. 1 Colors and Textures of Plastic Material. Provide extruded plastic material that matches selections made by the Architect from the manufacturer's full range of solid and stone pattern colors and full range of textures. B Aluminum Extrusions: Provide alloy and temper recommended by the manufacturer for the type of use and finish indicated, but with not less than the strength and durability properties specified in ASTM B 221 for 6063 -T5 C. Fasteners: Provide aluminum, nonmagnetic stainless steel, or other noncorrosive metal screws, bolts, and other fasteners compatible with aluminum components, hardware, anchors, and other items being fastened. Use theft -proof fasteners where exposed to view 2.3 IMPACT RESISTANT WALL COVERINGS A. Semirigid Sheet Wall Covering: Provide manufacturer's standard semirigid, embossed, fiber backed, impact resistant vinyl/acrylic sheets. Sheets shall comply with fire performance characteristics specified and be chemical- and stain- resistant. Provide manufacturer's standard matching moldings and trim as required. B. Quality Standard Product: Koroseal Korogard. Refer to Room Finish Schedule for texture, color, thickness, and location. 2.4 RUB RAILS AND CRASH RAILS A. Semirigid Vinyl/Acrylic or Resilient Vinyl Rub Rails: Provide either manufacturer's standard semirigid, embossed, impact resistant vinyl/acrylic linear rub rail with continuous vinyl retainer or manufacturer's linear vinyl rub rail and aluminum retainer Provide manufacturer's standard matching returns and trim as required. B. Quality Standard Product: Korogard C800 Refer to Room Finish Schedule and interior elevations for color and locations of rub rails. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS 2.5 CORNER GUARDS B. Quality Standard Product: Korogard B200 Color as selected by Architect from manufacturer's standard color selection. PART 3 EXECUTION 3.1 EXAMINATION SECTION 10265 PAGE 4 WALL SURFACE PROTECTION SYSTEMS A. Examine areas and conditions in which wall surface protection components and wall protection systems will be installed. 1 Complete all finishing operations, including painting and wallcovering, before beginning installation of wall surface protection system materials. B Impact Resistant Wall Covering Materials: Wall surfaces to receive impact resistant wall covering materials shall be dry and free from dirt, grease, loose paint, and scale. C. Corner Guards: Wall and Casework surfaces shall be dry and free from dirt, grease, and loose paint. D Do not proceed with installations until unsatisfactory conditions have been corrected. 3.2 PREPARATION A. General. Prior to installation, clean substrate to remove dust, debris, and loose particles. 3.3 INSTALLATION A. General. Install wall surface protection units plumb, level, and true to line without distortions. 1 Do not use materials with chips, cracks, voids, stains, or other defects that might be visible in the finished work. B. Install aluminum and vinyl retainers, mounting brackets, and other accessories in strict accordance with the manufacturer's instructions. 1 Where splices occur in horizontal runs of over 20 feet, splice retainer and plastic cover or insert at different locations along the run. t ti A. Semirigid Vinyl/Acrylic: Provide manufacturer's standard semirigid, embossed, impact resistant vinyl/acrylic cornet guards with continuous aluminum retainer Provide manufacturer's standard matching end caps as required. B. Quality Standard Product: Korogard G200 C. Color Match adjacent rub rails. 2.6 BUMPER GUARDS A. 1 -1/2 inch high by 7/8 inch wide bumper guards, used primarily as inserts in wood handrails. Extruded aluminum retainer with vinyl acrylic insert and matching injection molded end caps. 1 1 r 1 1 i 1 1 1 1 1 1 1 r 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS 3.4 CLEANING SECTION 10265 PAGE 5 WALL SURFACE PROTECTION SYSTEMS A. General. Immediately upon completion of installation, clean plastic covers and accessories using a standard ammonia based household cleaning agent. Clean metal components in accordance with the manufacturer's recommendations. B. Remove excess adhesive using methods and materials recommended by manufacturer C. Remove surplus materials, rubbish, and debris resulting from installation upon completion of work and leave areas of installation in neat, clean condition. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 10265 t i i 1 1 1 A t 1 r A MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This Section includes the following: 1. Fire extinguishers. 2. Fire extinguisher cabinets. 1.3 SUBMITTALS 1.4 QUALITY ASSURANCE PART 2- PRODUCTS 2.1 MANUFACTURERS SECTION 10522 PAGE 1 FIRE EXTINGUISHERS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. Related Sections: The following sections contain requirements that relate to this section. 1 Division 9 Section "Gypsum Board Assemblies." 2. Division 15 Section "Fire Protection." A. General. Submit the following according to the Conditions of the Contract and Division 1 Specification Sections. B. Product data for each type of product specified. For fire extinguisher cabinets include rough -in dimensions, details showing mounting method, relationships of box and trim to surrounding construction, door hardware, cabinet type and materials, trim style, door construction, panel style, and materials. C. Samples for verification purposes of each type of metal finish required, prepared on metal samples of same thickness and alloy indicated for final unit of work. Where finishes involve normal color and texture variations, include sample sets showing full range of variations expected. A. Single Source Responsibility Obtain fire extinguishers and cabinets from one source from a single manufacturer B. UL- Listed Products: Fire extinguishers shall be UL listed with UL listing mark for type, rating, and classification of extinguisher. C. FM- Listed Products: Fire extinguishers approved by Factory Mutual Research Corporation for type, rating, and classification of extinguisher and carry appropriate FM marking. A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1 Ansul Fire Protection. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2. Badger Powhatan. 3 J.L. Industries. 4 Larsen's Manufacturing Co. 5 Modern Metal Products by Muckle. 6. Nystrom Products Co. 7 Potter Roemer, Inc. 8. Samson Metal Products, Inc. 2.2 FIRE EXTINGUISHERS SECTION 10522 PAGE 2 FIRE EXTINGUISHERS A. General. Provide fire extinguishers for each extinguisher cabinet and other locations indicated, in colors and finishes selected by Architect from manufacturer's standard, that comply with requirements of governing authorities. 1. Fill and service extinguishers to comply with requirements of governing authorities and manufacturer. 2. Abbreviations indicated below identify extinguisher types related to UL classification and rating system and not necessarily to type and amount of extinguishing material contained in extinguisher B. Multipurpose Dry Chemical Type: UL -rated 4- A:60 -B:C, 10 -1b nominal capacity in enameled steel container. 2.3 FIRE EXTINGUISHER CABINETS A. General. Provide fire extinguisher cabinets where indicated, of suitable size for housing fire extinguishers of types and capacities indicated. B. Quality Standard Manufacturer Larsen's. Products from alternative manufacturers must meet or exceed the specifications for the products of the quality standard manufacturer. C. Fire Extinguisher Cabinets: 1 Flat Trim Fully- Recessed. Larsen's Architectural Series with full glass door, model FS 2409-R2 a. Cabinet door panels and trim shall be constructed of steel with baked acrylic enamel finish, full-swing steel hinges to permit the door to travel 180 degrees to conform to fire codes. b. Interior cabinet shall be constructed of not lighter than 18 -gage steel with baked enamel finish. D Rated Wall Installations: 1. Provide Larsen's "Flame Shield" option to match wall rating at cabinets recessed in rated wall assemblies. 1 r 1 1 i 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3- EXECUTION 0 1997 Mahlum Nordfors McKinley Gordon SECTION 10522 PAGE 3 FIRE EXTINGUISHERS 3.1 INSTALLATION A. Follow manufacturer's printed instructions for installation. B. Install in locations and at mounting heights indicated or, if not indicated, at heights to comply with applicable regulations of governing authorities. 1 Prepare recesses in walls for fire extinguisher cabinets as required by type and size of cabinet and style of trim and to comply with manufacturer's instructions. 2. Securely fasten mounting brackets and fire extinguisher cabinets to structure, square and plumb, to comply with manufacturer's instructions. END OF SECTION 10522 MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary bonditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes toilet and bath accessory items as scheduled and/or shown on drawings. 1.3 SUBMITTALS A. General. Submit the following according to Conditions of Contract and Division 1 Specifications Sections. B. Product data for each toilet accessory item specified, including construction details relative to materials, dimensions, gages, profiles, mounting method, specified options, and finishes. C. Maintenance instructions including replaceable parts and service recommendations. 1.4 QUALITY ASSURANCE A. Inserts and Anchorages: Furnish accessory manufacturers' standard inserts and anchoring devices that must be set in concrete or built into masonry Coordinate delivery with other work to avoid delay B Single -Source Responsibility Provide products of same manufacturer for each type of accessory unit and for units exposed to view in same areas, unless otherwise acceptable to Architect. 1.5 PROJECT CONDITIONS A. Coordination: Coordinate accessory locations, installation, and sequencing with other work to avoid interference with and ensure proper installation, operation, adjustment, cleaning, and servicing of toilet accessory items. 1.6 SPECIAL WARRANTY A. Warranty Submit a written warranty executed by mirror manufacturer, agreeing to replace any mirrors that develop visible silver spoilage defects within warranty period. B. Warranty Period. 15 years from date of Substantial Completion. PART 2- PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS SECTION 10800 PAGE 1 TOILET AND BATH ACCESSORIES A. Manufacturers: Subject to compliance with requirements, provide toilet accessories by one of the following: 1 Bobrick Washroom Equipment, Inc. 2. Bradley Corporation. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN ADDITIONS ALTERATIONS 2.2 MATERIALS, GENERAL A. Stainless Steel. AISI Type 302 /304 with satin finish, 0 034 -inch (22 -gage) minimum thickness. B. Mirror Glass: Nominal 6.0 -mm (0 23 -inch) thick, conforming to ASTM C 1036, Type I, Class 1, Quality q2, and with silvering, electro- plated copper coating, and protective organic coating. C. Galvanized Steel Mounting Devices: ASTM A 153 hot -dip galvanized after fabrication. D Fasteners: Screws, bolts, and other devices of same material as accessory unit, or of galvanized steel where concealed. 2.3 PAPER TOWEL DISPENSERS A. Surface- Mounted Towel Dispensers: Fabricate of stainless steel with hinged front equipped with tumbler lockset mounted on face of front. Provide pierced slots at sides as refill indicators. 1 Capacity Not less than either 400 C -fold or 525 multifold or 400 single -fold paper towels without special adapters. 2. Quality Standard: Bobrick model B -262. Note: Face mounted tumbler lock may be critical at under cabinet locations. Substitutions with top mounted tumbler lock will not be allowed. 2.4 TOILET TISSUE DISPENSERS A. Surface Mounted Toilet Tissue Dispenser Fabricate of heavy duty cast aluminum with satin finish for surface mounting. 1 Size: Unit to accommodate two separate core -type tissue rolls up to 5 inches in diameter 2. Quality Standard. Bobrick 13-2740 2.5 COMBINATION TOILET TISSUE DISPENSER/SANITARY NAPKIN DISPOSAL A. Recessed Unit: Stainless steel, combination unit fabricated for nominal 4 -inch wall depth with continuous seamless 1- inch -wide wall flange. Lockable door to access napkin disposal. 1. Size: Nominal 16 inches wide by 18 inches tall. Two roll capacity at tissue dispenser and 1 -1/2 gallon capacity at napkin disposal. 2. Quality Standard: Bobrick B35704 2.6 GRAB BARS SECTION 10800 PAGE 2 TOILET AND BATH ACCESSORIES A. Stainless Steel Type: Provide grab bars with wall thickness not less than 0 05 inch (18 gage) and as follows: 1. Mounting: Concealed, manufacturer's standard flanges and anchorage with four set screws. 2. Clearance: 1 -1/2 -inch clearance between wall surface and inside face of bar 3 Gripping Surfaces: Satin finish. 4 Heavy -Duty Size: Outside diameter of 1 -1/2 inches. 5 Backing: provide manufacturer's standard steel plate backing kit for each grab bar. 6 Quality Standard: Bobrick series 6206 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN ADDITIONS ALTERATIONS 2.7 SANITARY NAPKIN DISPOSAL UNITS SECTION 10800 PAGE 3 TOILET AND BATH ACCESSORIES A. Surface- Mounted Type: Fabricate of stainless steel with seamless exposed walls, tightly self closing top cover and locking bottom panel with continuous, stainless steel piano hinge. 1. Size: 8 inches wide by 11 inches high by 4 inches deep. 2. Quality Standard. Bobrick B -270 2.8 SEAT COVER DISPENSERS A. Recessed Type: Fabricate of stainless steel with concealed opening at bottom for filling; capacity not less than 500 seat covers. 1 Size: Nominal 16 inches wide by 11 inches high by 2 inches deep. 2. Quality Standard. Bobrick B -301 B. Surface Mounted Type: Fabricate of stainless steel with concealed opening at bottom for filling; capacity not less than 250 seat covers. 1 Size: Nominal 16 inches wide by 11 inches high by 2 inches deep. 2. Quality Standard: Bobrick B -221 2.9 MISCELLANEOUS ACCESSORIES A. Single Robe Hook: Fabricate of stainless steel with satin finish. Surface mount with concealed wall plate. 1. Quality Standard: Bobrick B-671 B. Double Robe Hook: Fabricate of stainless steel with satin finish. Surface mount with concealed wall plate. 1 Quality Standard. Bobrick B-672 C. Mop Holder Surface- mounted. Fabricate mounting base from stainless steel with three spring loaded, rubber can mop holders. 1. Quality Standard: Bobrick B -223 x 24 D Ladder Hooks: Fabricate from brass casting with satin nickel plated finish. 1 Quality Standard: Bobrick B -211 2.10 SHELF UNITS A. Fixed Units: Fabricate of 18 gauge stainless steel with satin finish. 16 gauge stainless steel mounting brackets. Hemmed front edges for safety Note: Provide custom notched openings for gooseneck faucets at scrub rooms. 1 Size: 5 inches wide by 18 inches long. 2. Quality Standard: Bobrick B -295 2.11 MIRROR UNITS A. Standard Stainless Steel Framed Mirror Units: Fabricate frame with 3/4" by 3/4" angles with heliarc welded corners, ground smooth. Provide satin finish. 1 Size: As indicated on drawings. 2. Quality Standard. Bobrick B -290 Series MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN ADDITIONS ALTERATIONS 2.12 SHOWER SEAT SECTION 10800 PAGE 4 TOILET AND BATH ACCESSORIES A. Folding Unit: L- shaped seat with stainless steel frame and mounting brackets, phenolic slat seats, self locking mechanism. 1 Size: 32 inches wide 2. 'Quality Standard. Bobrick B -5181 2.13 FABRICATION A. General. Only a maximum 1 -1/2- inch diameter, unobtrusive stamped manufacturer logo, as approved by Architect, is permitted on exposed face of toilet or bath accessory units. On either interior surface not exposed to view or back surface, provide additional identification by either a printed, waterproof label or a stamped nameplate, indicating manufacturer's name and product model number. B. Surface- Mounted Toilet Accessories, General. Except where otherwise indicated, fabricate units with tight seams and joints, exposed edges rolled. Hang doors or access panels with continuous stainless steel piano hinge. Provide concealed anchorage wherever possible. C. Recessed Toilet Accessories, General. Except where otherwise indicated, fabricate units of all welded construction, without mitered corners. Hang doors or access panels with full- length, stainless steel piano hinge. Provide anchorage that is fully concealed when unit is closed. D Framed Mirror Units, General. Fabricate frames for glass mirror units to accommodate wood, felt, plastic, or other glass edge protection material. Provide mirror backing and support system that will permit rigid, tamperproof glass installation and prevent moisture accumulation, as follows: 1 Provide galvanized -steel backing sheet, not less than 0 034 inch (22 gage) and full mirror size, with non absorptive filler material. Corrugated cardboard is not an acceptable filler material. E. Mirror Unit Hangers: Provide system for mounting mirror units that will permit rigid, tamperproof, and theft proof installation, as follows: 1 One piece, galvanized steel, wall -hanger device with spring- action locking mechanism to hold mirror unit in position with no exposed screws or bolts or 2. Heavy -duty wall brackets of galvanized steel, equipped with concealed locking devices requiring a special tool to remove. F Keys: Provide universal keys for access to toilet accessory units requiring internal access for servicing, re- supply etc. Provide minimum of six keys to Owner's representative. PART 3 EXECUTION 3.1 INSTALLATION A. Install toilet accessory units according to manufacturers' instructions, using fasteners appropriate to substrate as recommended by unit manufacturer Install units plumb and level, firmly anchored in locations and at heights indicated. B. Secure mirrors to walls in concealed, tamperproof manner with special hangers, toggle bolts, or screws. Set units plumb, level, and square at locations indicated, according to manufacturer's instructions for type of substrate involved. 1 1 t 1 1 1 r 1 1 r 1 t MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN ADDITIONS ALTERATIONS C. Install grab bars with backing to withstand a downward load of at least 250 lbs. complying with ASTM F 446. 3.2 ADJUSTING AND CLEANING SECTION 10800 PAGE 5 TOILET AND BATH ACCESSORIES A. Adjust toilet accessories for proper operation and verify that mechanisms function smoothly Replace damaged or defective items. B. Clean and polish all exposed surfaces strictly according to manufacturer's recommendations after removing temporary labels and protective coatings. 3.3 SCHEDULE OF ACCESSORIES A. General. Provide toilet accessories where indicated in the drawings. In addition provide the following if not shown in the drawings. B At new patient toilet/shower rooms: 1 Recessed combination toilet tissue dispenser /sanitary napkin disposal. 2. Grab bars at back and side of toilet and in shower 3 Fixed shelf unit 4 Two (2) Robe hooks C. At other toilet rooms: 1 Surface mounted toilet tissue dispenser /sanitary napkin disposal. 2. Surface mounted sanitary napkin disposal. 3 Surface mounted toilet seat cover dispenser 4 One (1) Robe hook D At lavatories and sinks in patient rooms: 1 Fixed mirror unit 2. Surface mounted paper towel dispenser E. At new lavatories and sinks in other than patient rooms: 1 Fixed mirror unit 2. Surface mounted paper towel dispenser 0 1997 Mahl= Nordfors McKinley Gordon END OF SECTION 10800 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIGMEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.3 SUBMITTALS SECTION 10990 PAGE 1 MISCELLANEOUS SPECIALTIES A. Drawings and general provisions of the Contract, including General and Supplementary c onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes miscellaneous specialties as scheduled and/or shown on drawings. B. Related work specified elsewhere includes: 1 Backing is specified in Division 6 Section `Rough Carpentry A. General. Submit the following according to Conditions of Contract and Division 1 Specifications Sections. B. Product data for each specialty item specified, including physical characteristics, dimensions, mounting methods, and accessories. C. Maintenance instructions including replaceable parts and service recommendations. 1.4 QUALITY ASSURANCE A. Inserts and Anchorages: Furnish specialty manufacturers' standard inserts and anchoring devices. Coordinate delivery with other work to avoid delay B. Single -Source Responsibility Provide products of same manufacturer for each type of specialty unless otherwise acceptable to Architect. 1.5 PROJECT CONDITIONS A. Coordination: Coordinate specialty locations, installation, and sequencing with other work to avoid interference with adjacent items and to ensure proper installation and operation. PART2- PRODUCTS 2.1 TELEVISION BRACKETS A. Wall Mounted Unit: Adjustable wall mount bracket fabricates of heavy gauge steel with baked on epoxy wrinkle finish. Provide lock 1. Size: Adequate to hold 19 inch Television 2. Capacity 75 lbs 3 Quality Standard: Lucasey HM1724 B. Furniture Mounted Unit: Swiveling, locking furniture mounting bracket fabricated of heavy gauge steel with baked on epoxy wrinkle finish. 1 Size: 23 x 14 2. Capacity 100 lbs. 3 Quality Standard: Lucasey F5502 MAHLUM NORDFORS MCKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 10990 PAGE 2 MISCELLANEOUS SPECIALTIES 2.2 COMPUTER SUPPORT SYSTEMS A. General. Integrated wall mounted support system for CPU's, monitors, and keyboards. B. Manufacturers: Subject to requirements, provide computer brackets and accessories by one of the following: 1 GCX Corporation, Petaluma, California, (800) 228 -2555 2. Hill -Rom Corporation, Batesville, Indiana, (800) 638 -2546 C. Wall Mounting Channel. High strength 4 inch extruded aluminum channel with clear anodized finish. 1 Quality Standard: GCX QC wall channel in lengths as shown in Interior Elevation Drawings. D Vertical CPU Mount: Steel bracket assembly designed to attach to wall mounting channel and hold CPU in vertical orientation. 1 Quality Standard: GCX Vertical CPU Mount sized to accommodate Owner's standard CPU E. Fixed Monitor Mount: Steel bracket and tray assembly designed to attach to wall mounting channel and hold monitor perpendicular to wall. 1 Quality Standard: GCX Wall Mount Assembly for Display Monitor, sized to accommodate Owner's standard 14 inch high by 14 inch wide x 16 inch deep Monitor F Pivoting Monitor Mount: Steel arm and tray assembly designed to attach to wall mounting channel, support Owner's standard 14 inch high by 14 inch wide x 16 inch deep Monitor, and pivot horizontally 1 Quality Standard: Hill -Rom Integris monitor arm P997 -03 and P997 -10 mounting plate and grab bar G. Retracting Keyboard Tray Steel bracket and tray assembly designed to attach to wall mounting channel and hold keyboard. Bracket to be retractable along its length, and pivot at its mounting point and it's keyboard tray 1. Quality Standard: GCX QC- KB- 1715PB13 H. Pivoting Keyboard Tray Steel bracket and tray assembly designed to attach to wall mounting channel and hold keyboard. Bracket to pivot at its wall channel mounting point, at its midpoint, and at the keyboard tray 1 Quality Standard: GCX QC -KB- 1712X1213 PART 3- EXECIJTION 3.1 INSTALLATION A. Provide backing as required by manufacturer Install miscellaneous specialties according to manufacturers' instructions, using fasteners appropriate to substrate as recommended by unit manufacturer. Install units plumb and level, firmly anchored in locations and at heights indicated. 1 1 1 1 1 1 1 1 1 1 r MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 ADJUSTING AND CLEANING A. Adjust miscellaneous specialties for proper operation and verify that mechanisms function smoothly Replace damaged or defective items. B. Clean and polish all exposed surfaces strictly according to manufacturer's recommendations after removing temporary labels and protective coatings. 3.3 SCHEDULE OF SPECIALTIES A. General. Provide miscellaneous specialties where indicated in the Project Drawings. In addition provide the following if not shown in the drawings. 1. Provide television brackets in quantities equal to one per bed in Patient Rooms. 2. Provide one Computer Support System per each Operating Room. 3 Provide one Computer Support System per each two Recovery stretcher stations, plus one in the Isolation Room. 0 1997 Mahhnn Nordfors McKinley Gordon SECTION 10990 PAGE 3 MISCELLANEOUS SPECIALTIES END OF SECTION 10990 1 1 t 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 RELATED DOCUMENTS SECTION 11452 PAGE 1 APPLIANCES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of appliances: 1 Cooking equipment, including ranges and ovens. 2. Refrigerator /freezers. B. Related Sections: The following sections contain requirements that relate to this Section. 1 Sinks, waste disposers and instant hot water dispensers are specified in Division 15 Section "Plumbing Fixtures." 2. Plumbing connections for appliances are specified in Division 15 3 Electrical services and connections for appliances are specified in Division 16 1.3 SUBMITTALS A. General. Submit the following according to Conditions of the Contract and Division 1 Specification Sections. B Product data for each appliance type required indicating compliance with requirements, including installation instructions. Provide complete operating and maintenance instructions for each appliance. C. Schedule: Submit schedule of appliances, using the same room designations as shown on drawings. 1 Example of required format for appliance schedule is included in last article of this Section. 1.4 QUALITY ASSURANCE A. Energy Ratings: Provide appliances that carry labels indicating energy cost analysis (estimated annual operating costs) and efficiency information as required by Federal Trade Commission. B. UL and NEMA Compliance: Provide electrical components required as part of appliances that are listed and labeled by UL and comply with applicable NEMA standards. C. AGA and ANSI Standards: Provide gas burning appliances that carry the design certification seal of the American Gas Association (AGA) and comply with ANSI Z21 -Series standards. D AHAM Standards: Provide appliances that conform to the following standards of the Association of Home Appliance Manufacturers: 1 Refrigerators and Freezers: Total volume and shelf area ratings certified according to ANSI/AHAM HRF -1 E. Single -Source Responsibility Obtain appliances from a single supplier 1 Provide products from the same manufacturer for each type of appliance required. MAHLUM NORDFORS McKTNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS F Design Criteria. The drawings indicate sizes, profiles, and dimensional requirements of appliances and are based on the specific types and models indicated. Appliances by other manufacturers may be considered, provided deviations in dimensions and profiles are minor and do not change the design concept as judged by the Architect. The burden of proof of equality is on the proposer 1.5 DELI$ERY AND STORAGE A. Deliver appliances to the Project site in the manufacturer's undamaged protective packaging. B. Delay delivery of appliances until utility rough -in is complete and construction in the spaces to receive appliances is substantially complete and ready for installation. 1.6 WARRANTIES A. Warranty Submit written warranties executed by the manufacturer of each appliance specified agreeing to repair or replace units or components that fail in materials or workmanship within the specified warranty period. 1 Microwave Oven. 9 -year limited warranty on defects in the magnetron tube. 2. Refrigerator/Freezer 5 -year warranty on the sealed refrigeration system. B. Warranties specified above shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents. PART 2 PRODUCTS 2.1 MANUFACTURERS SECTION 11452 PAGE 2 APPLIANCES A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering appliances that may be incorporated in the Work include, but are not limited to, the following: 1 Amana Refrigeration, Inc. 2. Frigidaire Appliance Company 3 G.E. (General Electric Company 4 Hotpoint. 5 Kitchen Aid, Inc. 6 Sears Kenmore 2.2 MICROWAVE OVENS A. Freestanding Microwave Oven. 1 Capacity 0.8 Cubic Feet 2. Power 800 -watt output 3 Features: Time defrost, auto defrost, instant on controls a. Controls: Solid -state electronic, touch type. b. Clock Type: Electronic. 4 Quality Standard Product: G.E. Spacemaker II model JEM25GV with optional undercabinet mounting kit. MAHLUM NORDFORS McKENLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 5 Plan Equipment Reference Number' #13 #23 SECTION 11452 PAGE 3 APPLIANCES 2.3 REFRIGERATOR/FREEZERS A. Top -Mount Freezer -Type Refrigerator/Freezer Provide freestanding, frost -free, two -door, top mount freezer model refrigerator /freezer on adjustable rollers, and reversible doors with door §helves. 1 Capacity Provide the following minimum values, measured according to ANSI/AHAM HRF -1 and certified by AHAM. a. Total volume: 16.4 cu. ft. b. Refrigerator volume: 12.58 cu. ft. c. Total shelf area: 17.5 sq. ft. 2. Energy Consumption. Measured and certified at not more than 3 0 kWh/day under average conditions. 3 Temperature Controls: Include separate temperature controls for each compartment and a switch for condensation- control heating element at the freezer opening. 4 Storage Features: Provide the following standard storage features: a. Adjustable glass interior cabinet shelves. b Two ice cube trays. 5 Quality Standard Product: G.E. S Series No Frost Refrigerator, model TBX16SAY 6 Plan Equipment Reference Numbers: #12, #24 C. Under Counter Compact Refrigerator/Freezer Provide a freestanding, manual defrost compact refrigerator with door shelves. 1 Capacity Provide the following minimum values, measured according to ANSI/AHAM HRF 1 and certified by ARAM. a. Total volume: 6 0 cu. ft. b Refrigerator volume: 5.51 cu. ft. c. Total shelf area. 11.0 sq. ft. 2. Energy Consumption. Measured and certified at not more than 3 0 kWh/day under average conditions. 3 Temperature Controls: Include separate temperature controls for each compartment. 4 Storage Features: Provide the following standard storage features: a. Adjustable wire interior cabinet shelves. 5 Optional Accessories: Provide refrigerator /freezer with the following additional features: a. Trim kit for custom plastic laminate face. 6 Quality Standard Product: Sears Kenmore model 49-95601 7 Plan Equipment Reference Numbers: #11, #22, #26 2.4 FINISHES A. General. Provide the manufacturer's standard porcelain enamel finish. B. Colors: Provide manufacturer's standard colors as shown or scheduled. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 3- EXECTJTION 3.1 INSTALLATION A. General. Comply with manufacturer's instructions and recommendations. B. Built -In Equipment: Securely anchor units to supporting cabinets or countertops with concealed fasteners. Verify that clearances are adequate for proper functioning and rough openings are completely concealed. C. Freestanding Equipment: Place units in final locations after finishes have been completed in each area. Verify that clearances are adequate to properly operate equipment. D Utilities: Refer to Divisions 15 and 16 for plumbing and electrical requirements. 3.2 ADJUST AND CLEAN A. Testing: Test each appliance to verify proper operation. Make necessary adjustments. B. Accessories: Verify that accessory items required have been furnished and installed. C. Cleaning: Remove packing material from equipment items and leave units in clean condition, ready for operation. 0 1997 Mahlum Nordfors McKinley Gordon SECTION 11452 PAGE 4 APPLIANCES END OF SECTION 11452 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of equipment: 1 New equipment furnished by Owner and installed by Contractor (FOIC). 2. New equipment furnished and Installed by Owner (PIO). 3 New equipment furnished and Installed by Contractor (FIC). 4 Existing equipment relocated by Contractor B. Related Sections: The following sections contain requirements that relate to this Section. 1 Division 5 Section `Metal Fabrications' for structural support systems for ceiling mounted equipment. 2. Division 11 Section "Appliances" for refrigerator /freezers and ovens. 3 Division 15 Section "Plumbing Fixtures and Trim" for sinks, fittings, and instant hot water dispensers. 4 Division 15 for plumbing connections 5 Division 16 for electrical services and connections. 1.3 DESCRIPTION OF WORK A. Provide and install FIC equipment as shown on drawings and as indicated in the schedule herein referenced. Provide appropriate backing, structural supports, electrical rough -ins, and mechanical rough -ins as required for a complete and thorough installation B Coordinate the work per Division 01 as required for equipment furnished and installed by the Owner (FIO) and equipment furnished by the Owner and installed by the Contractor (FDIC). C. Coordinate the work per Division 1 for existing items to be relocated. For relocated existing equipment from existing inventory to be installed at locations indicated on project drawings, provide appropriate backing, structural supports, electrical rough -ins, and mechanical rough ins as required for a complete and thorough installation. Coordinate with Owner on timetable and estimated period of designating existing equipment for relocation. Owner will relocate existing equipment (if any) from present location to new location for Contractor to install. 1.4 SUBMITTALS SECTION 11700 PAGE 1 EQUIPMENT A. General. Submit the following according to Conditions of the Contract and Division 1 Specification Sections. B. Engineered Shop Drawings: Provide engineered shop drawings, based on details in Project Drawings, for support of overhead equipment hung from building structure, designed by a professional engineer licensed to practice structural engineering in the State of Washington. Use manufacturer's published weight, moment, and tolerance data to size members and design attachments. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.5 QUALITY ASSURANCE A. Inserts and anchorages: Furnish equipment manufacturers' standard inserts and anchoring devices. Coordinate delivery with other work to avoid delay B. Secure manufacturer's installation data for equipment furnished by Owner in time to prepare substn tes and connections prior to delivery of equipment. 1.6 DELIVERY STORAGE, AND HANDLING SECTION 11700 PAGE 2 EQUIPMENT A. Leave equipment m containers designed to protect equipment and finish until final installation. Make arrangements to receive equipment at project site or to hold in warehouse until delivery can be made to job site. B Store equipment in original containers and in location to provide adequate protection to equipment while not interfering with other construction operations. C. Handle equipment carefully to avoid damage to components, enclosures, and finish. Do not install damaged equipment; replace and return damaged components to equipment manufacturer 1.7 PROJECT CONDITIONS A. General. Verify conditions at site affecting work to ensure the best and most complete installation per industry standards. Take field measurements to assure accurate fit of equipment at scheduled locations. B. Check electrical characteristics and water, steam, and gas pressure. Provide pressure regulating valves where required for proper operation of equipment. PART.2 PRODUCTS 2.1 GENERAL A. Manufacturer's catalogs and installation requirements related to the equipment referred to herein are hereby made a part of this section as if repeated herein. The published standards of quality and methods of installation are mandatory B. Sweet's catalogs referred to herein are year of this document. C. Provide equipment where shown on drawings but not less than the quantities which may be specified herein. D Equipment listed will be designated with the schedule abbreviations as described in Part 2.2A. These abbreviations establish which entity will supply and install all medical equipment listed. 2.2 SCHEDULE OF EQUIPMENT A. Abbreviations FOIC Furnished by Owner, Installed by Contractor FIO Furnished and Installed by Owner FIC Furnished and installed by Contractor RELOC Relocated and reinstalled by Contractor NIC Not in contract MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 11700 PAGE 3 EQUIPMENT B. Equipment List: The following equipment items are arranged in order, corresponding with the equipment numbers shown on the Project Drawings. Not all equipment is called out on Floor Plans. Some items called out on interior elevations by Section number may not have associated equipment number from the following list. 1 Surgical Light (FOIC) a. Project Area: Surgery b. Rooms: S125 -OR #1, S127 -OR #2, S128 -OR #3 S133 -OR #4 S132 -OR #5 S145- OR #6 c. Description. Amsco SQ240 Series, centrally mounted with 2 light heads d. Coordination. Electrical 2. Washer (FOIC) a. Project Area. Surgery b. Rooms: S130 Sub Sterile S131 Clean -Up c. Description. Amsco Reliance Washer model 444 d. Coordination: Electrical and Mechanical (including steam connection) 3 Cydex Sterilizer (F1O) a. Project Area. Surgery b. Room. S129 Sterile c. Description. Steris System 1 d. Coordination. Electrical and Mechanical 4 Refrigerator (RELOC) a. Project Area. Surgery b. Room. S139 Anesthesia Storage c. Description. Existing full size refrigerator relocated from existing Anesthesia Storage. d. Coordination. Electrical 5 Sterilizer (FOIC) a. Project Area. Surgery b. Room. S143 Sub Sterile c. Description. Amsco Eagle Century Series Small Sterilizer d. Coordination. Electrical and Mechanical 6. Blanket/Solution Wanner (FIO) a. Project Area: Surgery b. Room. S143 Sub Sterile c. Description. Amsco d. Coordination. Electrical 7 Blood Refrigerator (RELOC) a. Project Area: Surgery b. Room. S120 Pathology MAHLUM NORDFORS McI INLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 11700 PAGE 4 EQUIPMENT c. Description. Jewett Model #MACK08AE, existing blood refrigerator and monitor relocated from existing Pathology d. Coordination. Electrical 8. Cryostat (FIO) .a. Project Area. Surgery b. Room: S120 Pathology c. Description. Reichert Jung Cryocut 1800 d. Coordination. Electrical 9 Blanket/Solution Warmer (F1O) a. Project Area. Surgery b. Room. S117 Recovery c. Description: Amsco d. Coordination: Electrical 10 Ice Machine (FOIC) a Project Area. Surgery b. Room. S117 Recovery c. Description. Scotsman FD470 counter top flake ice maker and dispenser d. Coordination: Electrical and Mechanical 11 Undercounter Refrigerator (FIC) a. Project Area. Surgery b. Room. S117 Recovery c. Description. Refer to Section 11452 Appliances d. Coordination. Electrical 12. Refrigerator (FIC) a. Project Area. Surgery b. Room. S107 Lounge c. Description. Refer to Section 11452 Appliances d. Coordination: Electrical 13 Microwave Oven (FIC) a. Project Area. Surgery b. Room: S107 Lounge c. Description: Refer to Section 11452 Appliances d. Coordination. Electrical 14 Surgical Light (FOIC) a. Project Area. Short Stay b. Room. SS124 OR #7 c. Description. Amsco SQ240 Series, centrally mounted with 2 light heads d. Coordination. Electrical MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 15 Sterilizer (FOIC) a. Project Area. Short Stay b. Room: SS123 Sub Sterile c. Description. Amsco Eagle Century Series Small Sterilizer d. Coordination. Electrical and Mechanical SECTION 11700 PAGE 5 EQUIPMENT 16. Blanket/Solution Warmer (FIO) a. Project Area. Short Stay b. Room: SS123 Sub Sterile c. Description. Amsco d. Coordination: Electrical 17 Washer (FOIC) a. Project Area. Short Stay b. Rooms: SS126 Holding and SS125 Clean-Up c. Description. Amsco Reliance Washer model 444 d. Coordination. Electrical and Mechanical 18. Endoscope Washer (FIO) a. Project Area. Short Stay b. Room. SS150 Endo Clean-Up c. Description. Custom Ultrasonics System 83 plus 2ci d. Coordination. Electrical and Mechanical 19 Refrigerator (RELOC) a. Project Area. 2 Main b. Room. NM 225 Staff Lounge c. Description. Existing full size refrigerator relocated from existing Staff Lounge d. Coordination. Electrical 20. Microwave Oven (RELOC) a. Project Area. 2 Main b. Room. NM 225 Staff Lounge c. Description: Existing full size refrigerator relocated from existing Staff Lounge d. Coordination. Electrical 21. Blanket/Solution Warmer (FIO) a. Project Area. 2 Main b. Rooms: NM242 and NM226 c. Description. Amsco d. Coordination. Electrical 22. Undercounter Refrigerator (FIC) a. Project Area: 2 Main b. Room. NM236 Soiled Utility MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 11700 PAGE 6 EQUIPMENT c. Description. Refer to Section 11452 Appliances d. Coordination. Electrical 23 Microwave Oven (FIC) a. Project Area. 2 Main b. Room. NM237 Clean Utility c. Description. Refer to Section 11452 Appliances d. Coordination. Electrical 24 Refrigerator (FIC) a. Project Area. 2 Main b. Room. NM237 Clean Utility c. Description. Refer to Section 11452 Appliances d. Coordination. Electrical 25 Ice Machine (FOIC) a. Project Area. 2 Main b. Room. NM237 Clean Utility c. Description. Scotsman FD470 counter top flake ice maker and dispenser d. Coordination. Electrical and Mechanical 26 Undercounter Refrigerator (FIC) a. Project Area. 2 Main, 2 West b. Room. NM237 Meds and NW267 Meds c. Description. Refer to Section 11452 Appliances d. Coordination. Electrical 27 Garbage Disposal (RELOC) a. Project Area. Surgery b. Room. S120 Pathology c. Description. Existing garbage disposal relocated from existing pathology d. Coordination. Electrical and Mechanical 28 2 Panel Recessed X -Ray Film Viewbox (FIC) a. Project Area. Surgery Short Stay b. Rooms: Typically in OR s c. Description. General Electric Slimline Illuminator model E5003MB d. Coordination: Electrical 29 4 Panel Recessed X -Ray Film Viewbox (FIC) a. Project Area. Surgery Short Stay b Rooms: Typically in OR s c. Description. General Electric Slimline Illuminator, model E5003MD d. Coordination. Electrical MAHLUM NORDFORS McIONNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION 3.1 EXAMINATION A. Determine that conditions are acceptable to receive the work of this section. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer Starting of the work will be construed as acceptance of conditions. 3.2 PREPARATION A. Prepare substrates and connecting work to enable the best and most complete installation per industry standards of the work of this section. B. Coordinate with Owner, vendors, and other trades for specific requirements for each piece of equipment installation. 3.3 INSTALLATION A. Take care to follow and comply with all equipment manufacturer installation recommendations. i B. If conflict arises between equipment schedule list requirements and manufacturer's requirements, notify the Architect immediately Do not proceed until resolution of the conflict has been accomplished. 3.4 FIELD QUALITY CONTROL A. Testing: Coordinate start-up equipment when service lines have been tested, balanced, and adjusted for pressure, voltage, and similar considerations. Do not operate steam lines until they have been cleaned and treated for sanitation. 1 Test each item of operational equipment to demonstrate that it is operating properly and that controls and safety devices are functioning. Repair or replace equipment found to be defective in its operation, including units that are below capacity or operating with excessive noise or vibration. B. Provide experienced supervision of all elements of the work of this section. 3.5 CLEANING AND PROTECTION 0 1997 Mahlurn Nordfors McKinley Gordon SECTION 11700 PAGE 7 EQUIPMENT A. After completion of installation, remove protective coverings, if any and clean equipment, internally and externally Restore exposed and semiexposed finishes to remove abrasions and other damages; polish exposed -metal surfaces and touch -up painted surfaces. Replace work that cannot be successfully restored. B. Final Cleaning: After testing and start-up, and before time of Substantial Completion, clean and sanitize equipment, and leave in condition ready for use. END OF SECTION 11700 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes horizontal louver blinds. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of horizontal louver blind specified. Include printed data on physical characteristics. C. Shop drawings showing location and extent of blinds. Show installation details at and relationship to adjoining work. Include elevations indicating blind units. Indicate location of blind controls. D Samples for Verification Purposes: One 12- inch -long slat for each color slat required. E. Maintenance data to include in Operating and Maintenance Manual specified in Division 1 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has specialized in installing horizontal louver blinds similar to those required for this Project. B Surface Burning Characteristics: Provide blinds identical to those tested for the following fire performance characteristics as determined by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. 1 Test Method. NFPA 701 Small Scale Vertical Burn Test. C. Single Source Responsibility Obtain horizontal louver blinds from one source of a single manufacturer 1.5 PROJECT CONDITIONS A. Field Measurements: Check openings by field measurements before fabrication. Show recorded measurements on shop drawings. Coordinate fabrication schedule with construction progress to avoid delay in the Work. PART 2 PRODUCTS 2.1 MANUFACTURERS SECTION 12511 PAGE 1 HORIZONTAL LOUVER BLINDS A. Products: Subject to compliance with requirements, provide product manufactured by one of the following: B Approved Manufacturers: Hunter Douglas. Refer to Room Finish Schedule and Notes in Project Drawings for location, style and color MAHLUM NORDFORS MCIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS 2.2 MATERIALS AND FABRICATION A. Product Standard and Description. American Window Covering Manufacturers Association (AWCMA) Document 1029 Each horizontal louver blind unit consists of slats, rails, cord lock, tilting mechanism, tapes, and installation hardware complying with referenced product standard and requirements indicated on each Horizontal Louver Blind Product Data Sheet at the en21 of this Section. B Lifting and Tilting Mechanisms: Noncorrosive, self lubricating materials. C. Unit Sizes: Obtain units fabricated in sizes to fill window and other openings as follows, measured at 74 deg F (23 deg C) 1 Blind Units Installed at face of Jambs: Width and length equal to 1/2 inch more than opening dimensions formed by jamb, head, and sill members of opening in which each blind is installed. D Installation Fasteners: Not less than two fasteners per bracket, fabricated from metal noncorrosive to blind hardware and adjoining construction and to support blind units under conditions of normal use. PART 3- EXECIJTION 3.1 EXAMINATION A. Examine openings where horizontal louver blinds will be installed prior to beginning installation. Verify that critical dimensions are correct and surface conditions acceptable. 1 Complete all finishing operations, including painting, before beginning installation. 3.2 INSTALLATION SECTION 12511 PAGE 2 HORIZONTAL LOUVER BLINDS A. Install blinds level, plumb, and located so exterior slat edges in any position are not closer than 1 inch to interior face of glass lights, gaps between slat ends and jambs do not exceed 1/4 inch plus or minus 1/8 inch, and bottom rail in fully lowered position is within 1/2 inch of bottom of window or other opening. 3.3 CLEANING A. After completing the installation, clean blind surfaces according to the manufacturer's instructions. B Remove surplus materials, packaging, rubbish and debris resulting from the installation. Leave areas where installation occurred neat, clean, and ready for use. 3.4 SCHEDULE A. Refer to Room Finish Schedule and Notes in Project Drawings for location, style and color B In addition, provide blinds at all new interior relites. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 12511 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITION ALTERATIONS SECTION 12541 PAGE 1 DRAPERIES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary t�onditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes draperies and drapery hardware. 1.3 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of drapery specified. Include printed data on physical characteristics. C. Shop drawings showing location and extent of draperies. Show installation details at and relationship to adjoining work. Include elevations indicating drapery units. Indicate location of drapery controls. D Two (2) Samples for Verification Purposes of each drapery fabric indicated. E. 24 inch long sample of drapery track assembly including all accessories. F Maintenance data to include in Operating and Maintenance Manual specified in Division 1 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced Installer who has specialized in installing draperies similar to those required for this Project. B Surface Burning Characteristics: Provide draperies identical to those tested for the following fire performance characteristics as determined by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. 1 Test Method. NFPA 701, Large and Small Scale Vertical Burn Test. C. Volatile Organic Compounds: Non detectable best rating for formaldehyde emission and total volatile organic compounds (VOC). D Single Source Responsibility Obtain draperies from one source of a single manufacturer 1.5 PROJECT CONDITIONS A. Field Measurements: Check openings by field measurements before fabrication. Show recorded measurements on shop drawings. Coordinate fabrication schedule with construction progress to avoid delay in the Work. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Products: Subject to compliance with requirements, provide product manufactured by one of the following: MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITION ALTERATIONS C. Approved Hardware Manufacturers: 1 Kirsch 2. Graber Company 3 Others as approved by addendum. SECTION 12541 PAGE 2 DRAPERIES B Approved Drapery Manufacturers: 1 Maharam. Refer to Room Finish Schedule in Project Drawings for style, type, and color 2.2 MATERIALS AND FABRICATION A. Drapery Track: Kirsch No. 94005 050 extruded aluminum track with Teflon coated surfaces. B. Control. Fiberglass baton draw system. Mount baton on front side of drape. C. Drapery Type: Pinch Pleated D Drapery Fabric: 100% fire resistant Polyester Refer to Volume 2 Project Drawings, Room Finish Schedule for manufacturer style, color, and pattern of drapery fabric. E. Lining Type: 100% fire resistant. Refer to Volume 2 Project Drawings, Room Finish Schedule for manufacturer, style, color and pattern of lining fabric. PART 3 EXECUTION 3.1 EXAMINATION A. Examine openings where draperies will be installed prior to beginning installation. Verify that critical dimensions are correct and surface conditions acceptable. 1 Complete all finishing operations including painting ceiling before starting installation of drapery hardware 2. Complete final cleaning of project before installation of drapes. 3.2 INSTALLATION A. Install draperies level, plumb, and located so that bottom of drapes is 12 inches below window sill. 3.3 CLEANING A. After completing the installation, vacuum clean drapery surfaces according to the manufacturer's instructions. B. Remove surplus materials, packaging, rubbish and debris resulting from the installation. Leave areas where installation occurred neat, clean, and ready for use. 3.4 SCHEDULE A. Refer to Room Finish Schedule and Notes in Project Drawings for style, pattern, color and location of draperies. 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 12541 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following hydraulic elevators: 1 Holeless Jack hospital type elevator SECTION 14240 PAGE 1 HYDRAULIC ELEVATORS B. Related Sections: The following sections contain requirements that relate to this Section. 1 Setting of sleeves, inserts, and anchoring devices in concrete is specified in a Division 3 section. 2. Subsills and structural framing of hoistway entrances are specified in Division 5 Section "Metal Fabrications." 3 Flooring and base in specified in Division 9 Section `Resilient Tile Flooring' and scheduled in Room Finish Schedule in Project Drawings. 4 Field painting of hoistway entrances is specified in Division 9 Section "Painting." 5 Ventilation of hoistway(s) and machine room(s) is specified in Division 15 6 Electrical service to each elevator, including fused disconnect switch, is specified in Division 16 sections. 1.3 DEFINITIONS A. Hydraulic elevators are hereby defined to include systems in which cars are hoisted either directly or indirectly by action of a hydraulic plunger and cylinder (jack); with other components of the work including fluid storage tank, pump, piping, valves, car enclosures, hoistway entrances, control systems, signal equipment, guide rails, electrical wiring, roping, buffers, and devices for operating, dispatching, safety security leveling, alarm, maintenance, and similar required performances and capabilities. 1.4 SYSTEM DESCRIPTION A. Capacity 4 000 lbs B. Speed. 125 feet per minute C. Travel Distance: 11 -6' D Landings Served: Basement and first floor E Power supplied. 480 VAC, 3 Phase, 60Hz F Machinery (2) plungers in floor mounted cylinders (holeless type), submersible pump, 40 HP motor, large tank. G. Control System. Selective Collective H. Car Size: 6 -0' by 8 -4' by 8' -0' high. MAHLUM NORDFORS MCHINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS I. Hoistway Entrance: Two speed horizontal sliding doors with 4 0' clear door opening. 1.5 SUBMITTALS A. General. Submit the following in accordance with Conditions of Contract and Division 1 Specifications Sections. B. Product Data for each principal component or product of each elevator, including certified test reports on required testing. Indicate capacities, sizes, performance and operating characteristics, features of control system, finishes, and similar information. Indicate any variations from specified requirements. C. Shop Drawings including dimensioned drawings showing plans, elevations, sections and large scale details indicating service at each landing, coordination with building structure and relationships with other construction, and details of car enclosures and hoistway entrances. Include elevatoring diagrams to indicate elevator service to each level. D Wiring diagram detailing wiring for power, signal and control systems differentiating clearly between manufacturer installed wiring and field installed wiring. Indicate maximum and average power demands F Maintenance Manuals: Bound manual for each elevator or group of elevators, with operating and maintenance instructions, parts listing, recommended parts inventory listing, purchase source listing for major and critical components, emergency instructions, and similar information. G. Certificates and Permits: Provide Owner with copies of all inspection/acceptance certificates and operating permits as required by governing authorities to allow normal, unrestricted use of elevators. 1.6 QUALITY ASSURANCE A. Installer Qualifications: Engage the elevator manufacturer or an installer approved by the elevator manufacturer and who has completed elevator installations similar in material, design, and extent to that indicated for Project which have resulted in installations with a record of successful in- service performance. B. Regulatory Requirements: In addition to local governing regulations, including WAC 296 -95 comply with applicable requirements of ASME/ANSI All 1, Safety Code for Elevators and Escalators (hereafter referred to as the "Code 1.7 WARRANTY SECTION 14240 PAGE 2 HYDRAULIC ELEVATORS A. Special Project Warranty Provide special project warranty signed by Contractor, Installer, and Manufacturer agreeing to replace, repair or restore defective materials and workmanship of elevator work during warranty period. This warranty shall be in addition to, and not a limitation of, other rights the Owner may have against the Contractor under the Contract Documents. 1 "Defective" is hereby defined to include, but not by way of limitation, operation or control system failures, performances below required minimums, excessive wear unusual deterioration or aging of materials or finishes, unsafe conditions, the need for excessive maintenance, abnormal noise or vibration, and similar unusual, unexpected, and unsatisfactory conditions. 2. Warranty period is 12 months starting on date of Substantial Completion. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 1.8 MAINTENANCE SERVICE 2.2 MATERIALS AND COMPONENTS E. Car Frame and Platform: Manufacturer's standard welded steel units. 2.3 CONTROL SYSTEMS SECTION 14240 PAGE 3 HYDRAULIC ELEVATORS A. Initial Maintenance Service: Provide full maintenance service by skilled, competent employees of the elevator Installer fbr period of 12 months following Date of Substantial Completion. Include monthly preventive maintenance performed during normal working hours. Include repair or replacement of worn or defective parts or components and lubricating, cleaning, and adjusting as required for proper elevator operation in conformance with specified requirements. Include 24- hours per -day 7 -days- per -week emergency callback service. Exclude only repair or replacement due to misuse, abuse, accidents, or neglect caused by persons other than Installer's personnel. PART 2- PRODIJCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include but are not limited to the following: 1 Dover Elevator Corp. 2. Montgomery Elevator Co. 3 Otis Elevator Co. 4 Schindler Elevator Corp. 5 U.S. Elevator /Cubic Corp. A. General Requirement: Provide manufacturer's standard pre- engineered elevator systems that will comply with or fulfill the requirements of System Description in Part 1 of this Section or, at manufacturer's option, provide custom manufactured elevator systems that will fulfill requirements. Where components are not otherwise indicated, provide standard components published by manufacturer as included in standard pre engineered elevator systems and as required for a complete system. B. Hydraulic Machines and Elevator Equipment: Provide manufacturer's standard holeless hydraulic jack unit for each elevator, with electric pump- tank-control system equipment in machine room as indicated. C. Piping: Provide size, type, and weight piping recommended by manufacturer and provide isolation couplings to prevent sound/vibration transmissions from power unit. D Inserts: Furnish required concrete inserts and similar anchorage devices for the installation of guide rails, machinery and other components of elevator work where installation of devices is indicated as work of another specification section. A. General. Provide manufacturer's standard control system for each elevator or group of elevators as required to provide automatic or group automatic operation of the type indicated and defined in the Code as "Operations." B. Single Elevator Control Passenger Provide solid -state "Selective Collective Automatic Operation," as defined in ASME/ANSI A17 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 14240 PAGE 4 HYDRAULIC ELEVATORS C. Auxiliary Operations/Controls: In addition to primary control system features, provide the following controls or operational features for passenger elevators, except where otherwise indicated: 1. Emergency power operation. 2. Emergency hospital service. 2.4 SIGNAL EQUIPMENT A. General. Provide signal equipment for each elevator or group of elevators to comply with requirements indicated below 1 Provide illuminated hall -call and car -call buttons that light up when activated and remain lighted until call or other function has been fulfilled; fabricate of acrylic or other permanent translucent plastic. 2. Except for buttons and illuminated signal elements, fabricate signal equipment with exposed surfaces of stainless steel with manufacturer's standard satin finish. 3 Car Control Stations: Provide car control station in each car with flush mounted metal faceplates containing call button for each landing served and other buttons, switches, and controls required for specified car operation and control. Mount as shown or scheduled at height complying with ASME/ANSI A117 1 If not otherwise indicated, mount in return panel adjacent to car door Provide operating device symbols as required by Code. Mark other buttons and switches with manufacturer's standard identification for required use or function. 4 Car Position Indicator• For passenger elevator cars, provide digital display type, located near top of each car or in car control station. Include direction -of- next travel signal if not provided in car control station. a. In addition to visual indicator, provide audible signal to indicate to passengers that car is stopping at each of the floors served. 5 Hall Push -Button Station. Provide hall push -button station at each landing for each elevator 6 Hall Lanterns: Provide units with illuminated "up" and "down" signal arrows, but provide single arrow where only one direction is possible. Provide units projecting from faceplate for ease of angular viewing, except provide flush units where a location in hoistway entrance frame is indicated. Match materials, finishes, and mounting method of hall push -button stations. a. At manufacturer's option, hall lantern signals may be placed with hall push -button station, except at ground floor b. Provide special oversized hall lantern signals at ground floor c. In conjunction with each hall lantern device, provide an audible signal to indicate that a car is arriving in response to a hall call and to indicate direction of car travel. Signal shall sound once for up direction of travel and twice for down direction. 1) At manufacturer's option, audible signal may be placed on each car. 7 Telephone: Provide rough -in for telephone hand set in each car, contained in flush mounted cabinet and complete with identification and instructions for use. Provide a fireman's telephone cabinet or fireman's telephone jack in main elevator lobby 8. Alarm System. Provide emergency alarm bell properly located within building and audible outside hoistways, equipped to sound automatically in response to emergency stops and in response to "Alarm" button on each car control station. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS 2.5 PASSENGER ELEVATOR CAR ENCLOSURES A. General. Provide manufacturer's standard pre- engineered car enclosures of the selections indicated. Include ventilation, lighting, ceiling finish, wall finish, access doors, doors, power door operators, sill (threshold), trim, accessories, and floor finish unless indicated as not work of this Section. Provide horizontal sliding doors of manufacturer's standard flush panel type, With operation and number of panels as indicated. Provide manufacturer's standard protective edge trim system for door and wall panels, except as otherwise indicated. 1 Materials and Fabrication: Provide selections as indicated for each car enclosure surface; provide manufacturer's standards, but not less than the following: a. Enameled Steel Panels; Flush hollow metal construction, fabricated from ASTM A 366 cold -rolled steel, commercial quality Class 1, matte finish, stretcher leveled. Provide with factory applied baked -on enamel finish; colors as selected by Architect. b. Aluminum Sills: Cast or extruded aluminum, with grooved surface, 1/4 -inch thickness, mill finish. c. Plastic Laminate Wall Panels: High pressure type complying with NEMA LD3 Type GP -50 (0 050 -inch nominal thickness); color texture, and pattern as selected by Architect from standard products available in the industry d. Fabricate car door frame integrally with front wall of car e. Fabricate car with recesses and cutouts for signal equipment. f. Luminous Ceiling: Fluorescent light fixtures and ceiling panels of translucent or open egg -crate plastic, of acrylic or other permanent rigid plastic complying with flammability requirements. Vinyl Composition Tile Floor Covering: Refer to Room Finish Schedule and Division 9 Section `Resilient Tile Flooring. g. 2.6 PERSONAL PROTECTIVE DEVICES A. Handrails: Provide manufacturer's standard stainless steel handrails on side walls and back wall unless otherwise indicated either continuous or segmented units. SECTION 14240 PAGE 5 HYDRAULIC ELEVATORS B Door Edge Protective Device: Provide retractable edge shoe on leading edges of elevator entrance doors that causes doors to stop and reopen upon contacting an obstruction in entrance. C. Photo -Eye Detection Device: Provide electronic photo -eye device with timed cutout, projecting dual light beams across car entrance at 5 -inch and 29 -inch heights, that when interrupted will cause closing doors to stop and reopen. Provide keyed switch in car operating panel or toggle switch in service cabinet for disconnecting photo -eye protective device. E. Nudging Feature: After car doors are prevented from closing for a predetermined adjustable time period, through activation of detection device or door edge protective device, a loud buzzer shall sound and doors shall begin to close at reduced rate of speed. Doors shall continue to close unless door edge protective device is activated, which shall cause doors to reopen. Process shall repeat continuously until obstruction is removed from entrance. F Manual Overide Switch: Provide toggle or rocker switch at car control panel which will overide automatic door closure and disable nudging feature to allow loading of equipment into car without interference from car doors. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 2.8 PASSENGER HOISTWAY ENTRANCES PART 3- EXECUTION 3.1 EXAMINATION 3.2 INSTALLATION OF ELEVATOR SYSTEM SECTION 14240 PAGE 6 HYDRAULIC ELEVATORS A. General. Provide manufacturer's standard, pre engineered, hollow metal type, sliding, door and -frame hoistway entrances complete with track systems, hardware, safeties, sills, and accessories. Match car enclosure doors for size, number of door panels, and door panel movement. Provide frame- section size and profile to coordinate with hoistway wall construction as indicated. 1 Where gypsum -board wall construction is indicated, fabricate frames with reinforced head sections; provide sufficient strength without support from wall lintels. B. Materials and Fabrication: Provide selections indicated that comply with manufacturer's standards, but not less than the following: 1 Enameled Frames: Formed steel with manufacturer's standard baked synthetic enamel finish, colors as selected by Architect. 2. Enameled Steel Panels: Flush hollow -metal construction, fabricated from ASTM A 366 cold rolled steel, commercial quality Class 1, matte finish, stretcher leveled. Provide with factory- applied baked -on enamel finish; colors as selected by Architect. 3 Aluminum Sills: Extruded aluminum, with grooved surface, 1/4 -inch thickness, mill finish. A. Prior to commencing elevator installation, examine hoistways, hoistway openings, pits, and machine rooms, as constructed; verify all critical dimensions and examine supporting structure and all other conditions under which elevator work is to be installed. Notify Contractor in writing of any dimensional discrepancies or other conditions detrimental to the proper installation or performance of elevator work. Do not proceed with elevator installation until unsatisfactory conditions have been corrected in a manner acceptable to the Installer A. General. Comply with manufacturer's instructions and recommendations for work required during installation. B. Install hydraulic jack units plumb and accurately centered for elevator car position and travel; anchor securely in place. C. Welded Construction. Provide welded connections for installation of elevator work where bolted connections are not required for subsequent removal or for normal operation, adjustment, inspection, maintenance, and replacement of worn parts. Comply with AWS standards for workmanship and for qualifications of welding operators. D Coordination: Coordinate elevator work with work of other trades for proper time and sequence to avoid construction delays. Use benchmarks, lines, and levels designated by Contractor to ensure dimensional coordination of the work. E. Sound Isolation. Mount rotating and vibrating elevator equipment and components on vibration- absorption mounts, designed to effectively prevent transmission of vibrations to structure and thereby to eliminate sources of structure -borne noise from elevator system. F Install piping without routing underground, where possible. Where not possible, cover underground piping with permanent protective wrapping before backfilling. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 14240 PAGE 7 HYDRAULIC ELEVATORS G. Lubricate operating parts of systems, including ropes, if any as recommended by manufacturers. H. Alignment: Coordinate installation of hoistway entrances with installation of elevator guide rails for accurate alignment of entrances with cars. Where possible, delay installation of sills and frames until car is operable in shaft. Reduce clearances to minimum, safe, workable dimension at each landing. I. Leveling Tolerance: 1/2 inch, up or down, regardless of load and direction of travel. J Set sills flush with finished floor surface at landings. Coordinate with other trades to facilitate and ensure proper grouting of sills. 3.3 FIELD QUALITY CONTROL A. Acceptance Testing: Upon nominal completion of each elevator installation, and before permitting use of elevator (either temporary or permanent), perform acceptance tests as required and recommended by Code and by governing regulations or agencies. B. Operating Tests: Load each elevator to its rated capacity and operate continuously for 30 minutes over its full travel distance, stopping at each level and proceeding immediately to the next. Record temperature rise of pump motor (except submerged pumps) during 30- minute test period. Record failures of elevator to perform as required. C. Advise Contractor, Owner, Architect, and inspection department of governing agencies in advance of dates and times tests are to be performed on elevators. 3.4 PROTECTION A. At time of Substantial Completion of elevator work (or portion thereof), provide suitable protective coverings, barriers, devices, signs, or such other methods or procedures to protect elevator work from damage or deterioration. Maintain protective measures throughout remainder of construction period. B Provide similar protective measures for elevator units that will be placed in temporary service, including inspection and maintenance service during period of temporary service. 3.5 DEMONSTRATION A. Instruct Owner's personnel in proper use, operations, and daily maintenance of elevators. Review emergency provisions, including emergency access and procedures to be followed at time of failure in operation and other building emergencies. Train Owner's personnel in normal procedures to be followed in checking for sources of operational failures or malfunctions. Confer with Owner on requirements for a complete elevator maintenance program. B. Make a final check of each elevator operation with Owner's personnel present and just prior to date of Substantial Completion. Determine that control systems and operating devices are functioning properly 0 1997 Mahlum Nordfors McKinley Gordon END OF SECTION 14240 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary conditions and Division 1 specifications, apply to work in this section. 1.2 SUMMARY SECTION 14600 PAGE 1 PNEUMATIC TUBE SYSTEM A. This Section Includes work associated with pneumatic tube systems. 1 Provide all materials, equipment, and labor to relocate and mechanically and electronically upgrade four (4) existing PTP /ATC relay controlled pneumatic tube stations. 2. Demolition and salvage of all existing components (wye branches, check valves, air vents, receive limit switches, etc.) rendered obsolete by work in this contract. B Related Sections: The following Sections contain requirements that relate to this Section. 1. Division 8.Section Access Doors' for access panels required for servicing of equipment or tubing above hard ceilings. 2. Division 9 Section `Gypsum Board Assemblies' for partitions in which pneumatic tube stations are recessed. 3 Division 9 Section `Painting' for painting of exposed pneumatic tubes and relocated tube stations. 4 Division 16 `Electrical' for power connections to each station. 1.3 SUBMITTALS A. General. Submit each item in this article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for new components and materials including tubes, controls, branches, etc. C. Shop Drawings showing details of all equipment, proposed tube routings and color finishes to be provided. Include plans, elevations, and sections as required to clearly indicate scope of work. D Qualification Data for firms and persons specified in the `Quality Assurance' Article to demonstrate their capabilities and experience. Include list of completed project with names, addresses, names of architects and owners, and other information specified. E. Wiring diagrams detailing locations and wiring for power and control systems, and differentiating clearly between manufacturer installed wiring and field installed wiring. F Maintenance manuals: Include operating and maintenance instructions, parts listing with sources indicated, recommended parts inventory listing, and similar information. 1.4 QUALITY ASSURANCE A. Single Source Responsibility Obtain all pneumatic tube components from a single supplier B Fabricator Qualifications: Firm experienced in producing pneumatic tube systems exactly matching or similar to existing systems in place at site. MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS ALTERATIONS C. Installer Qualifications: Engage an installer approved by the pneumatic tube manufacturer and who has completed pneumatic tube installations similar in material, design, and extent to that indicated for the Project, which have resulted in installations with a record of successful in- service performance. The following installers meet the above requirement: 1. Passage Activating Systems, Inc. (503) 612 -0357 2. 'Others as approved by addendum 1.5 COORDINATION WITH OTHER TRADES A. Schedule and coordinate the work of this section with other trades involved with the completion of the project. Verify delivery and installation of all equipment with the approved schedule of this project. Furnish and install required items for a complete and operable installation so as to cause no delay to the Work. 1.6 WARRANTY SECTION 14600 PAGE 2 PNEUMATIC TUBE SYSTEM A. Warranty all new components to be free from defects in material, workmanship, and operation, under normal use, for a period of 12 months from the date of substantial completion. This warranty shall be in addition to, and not a limitation of, other rights the Owner may have against the Contractor under the Contract Documents. PART 2 PRODUCTS 2.1 PNEUMATIC TUBE MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers that may be incorporated into the work are limited to the following: 1 Pneumatic Tube Products, Inc. Hayward, California. 2 Others as approved by addendum. B. Quality Standard Product: Modulaire System 2.2 SYSTEM MATERIALS A. Line material. 4 inch diameter, 16 gauge galvanized steel specifically manufactured for pneumatic tube systems. Fabricate bends from the same material. B. Hangers and Supports: 3/8' threaded, galvanized steel rod, 3/8' x 2' concrete anchors, industry standard row clamps and/or single loop hangars. C. Station Equipment: Manufacturer's standard equipment compatible with the existing equipment housing. 1 Standard Type Station. Separate dispatcher and slidegate assembly optical magazine, receive and overload limit switches, receive rollout area and control panel with molded ABS cover 2. Station Control Panel. Upgraded station control panel consisting of the following: a. 24 Key membrane keypad b. 48 character liquid crystal display (LCD) c. Microprocessor control printed circuit board 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN/SURGERY ADDITIONS &.ALTERATIONS PART 3 EXECUTION 3.1 INSPECTION 3.2 SERVICE DISRUPTION AND PHASING SECTION 14600 PAGE 3 PNEUMATIC TUBE SYSTEM d. Input and output (I/O) PCB that includes optical limit switch controls with maintenance indicators, logic power supply (plug -in type for ready replacement), and polarized connections for field wiring with built -in test points. A. Examine the site and verify that no irregularities exist which will affect the quality of the installation. Report any discrepancies to the Architect. Do not proceed with installation until unsatisfactory conditions have been corrected in a manner acceptable to the installer A. Service Disruption. Make every effort to minimize any inconvenience to the hospital staff and/or services during system testing and/or required shut -downs while making removals of, or connections to, the existing systems. Schedule system shutdowns to take place outside normal business hours. Coordinate all system disruption with the Engineering Services Department. B. Phasing: Coordinate all work with project phasing so that areas occupied by the Owner during each phase have access to a functioning pneumatic tube station. In general adhere to the following sequence of work: 1 Phase One Basement: Reroute airline from blower to diverter A and storage room if required to install new tubes. Intercept existing tube line up to station A4 reroute and core drill first floor at new riser location at coordinates 7 8/H. Run new tube up and cap at first floor 2. Phase One First Floor Demolish stations A4 and A5 Cap off tube line to A5 3 Phase One Second Floor Demolish stations C 1 and C2. Cap off tube lines. 4 Phase Two First Floor Install station cans and plumb in new tube from new A4 riser location and intercept point of existing tube to A5 Install new station electronic and mechanical inserts and interface into existing system. Compete. 5 Phase Two Second Floor Install station cans, new station electronic and mechanical inserts, and plumb in new station locations. Complete. 3.3 INSTALLATION A. Removal and Salvage: Remove all tubing, bends, deflector switches, merging wyes, check valves, air vents, and associated materials not required to maintain the successful operation of the system. Deliver removed items to the Owner's Engineering Services Department for future use as they see fit. B. Coordinate required core drills through floors or walls with other trades. C. Lines: Form bends into a minimum radius of 48 inches. Form all joints with a sleeve or bell connection and seal airtight. D Hangars: Install hanger rods to structure with appropriate anchors. Space hangers to not exceed 10' -0' on center Support each bend by a single hanger at the center of its radius, and an additional hanger not more than 10 -0' from each end. Use standard row clamps at floor penetrations to support vertical tubing. E. Control Cable: Strap low voltage control cable to the tubing at minimum 10' 0' on center MAHLUM NORDFORS MdCNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2 MAIN /SURGERY ADDITIONS ALTERATIONS 3.4 TESTING AND ACCEPTANCE A. System Testing: Perform system testing, in the presence of the Owner, prior to substantial completion of each phase. Testing to consist of the following: 1. Operational Performance: Demonstrate that the installed system operates in accordance with all ,criteria set forth in part 2 of this specification. 2. Operational Reliability Send transactions in and out of every station and through each piece of system equipment using new carriers. Demonstrate an alarm rate not greater than 1 percent, excluding alarms created by overloaded stations and other operator error with only normal wear shown by carriers. B. Acceptance: System will be considered acceptable after thirty consecutive days of operation by the Owner's personnel (after the date of successful tests), with an alarm rate of less than one percent of system transactions associated with work in this Project, excluding alarms created by overloaded stations and other operator error 3.5 TRAINING A. Provide two hours of training to demonstrate the modifications made to the system and answer any questions regarding the new features added to the system program and controls. 1 Deliver three sets of Operation Manuals to the Engineering Services Department at the time of the training session. 0 1997 Mehhnn Nordfors McKinley Gordon SECTION 14600 PAGE 4 PNEUMATIC TUBE SYSTEM END OF SECTION 14600 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Section Number 15010 15020 15030 15040 15060 15070 15090 15100 15420 15440 15480 15500 15640 15650 15660 15700 15800 15850 15900 MECHANICAL TECHNICAL SPECIFICATIONS TABLE OF CONTENTS Section Title General Provisions Vibration Isolation Mechanical Painting and Identification Balancing Air and Water Systems Piping and Fittings Mechanical Systems Insulation Piping and Mechanical Equipment Support Valves Soil, Waste and Vent Systems Plumbing Fixtures and Trim Medical Gas Systems Automatic Fire Protection Systems Refrigeration Equipment Liquid Heat Transfer Systems Steam Systems Air Handling Equipment Air Distribution Systems Air Filtration Automatic Temperature Controls PAGE 1 TABLE OF CONTENTS Olympic Memorial Hospital 2 Main Surgery Remodel Mechanical Drawing List September 3, 1997 Dwg No. Description MO.1 Legend, Abbreviation Drawing Index MO.2 Equipment Schedules MO.3 Equipment Schedules M1 B.1 M1 B.2 M1 B.3 M1 1 1 M1 1.2 M1 1 3 M1 1 4 M1.2.1 M1 3.1 M1 4 1 M1 4.2 M2.B 1 M2. B.2 M2.B 3 M2.1 1 M2.1.2 M2.1 3 M2.1 4 M2.2.1 M3 1 1 M3 1.2 M3 1 3 M3 1 4 M3.2.1 M3 31 M3 41 M3 4.2 M3 4 3 M3 4 4 M4 1 M4.2 M4 3 M4 4 M7 1 Details Partial Basement Floor Plan North Demolition Phase 1 Partial Basement Floor Plan North Demolition Phase 2 Partial Basement Floor Plan North Demolition Phase 3 Partial First Floor Plan North Demolition Phase 1 Partial First Floor Plan North Demolition Phase 2 Partial First Floor Plan North Demolition Phase 3 Partial First Floor Plan Short Stay Demolition Phase 1 Partial Second Floor Plan North/VVest Demolition Phase 1 Partial Third Floor Plan North Demolition Phase 1 Partial Roof Plan North/West Demolition Phase 1 Partial Roof Plan North/West Demolition Phase 2 Partial Basement Floor Plan North Mechanical Phase 1 Partial Basement Floor Plan North Mechanical Phase 2 Partial Basement Floor Plan North Mechanical Phase 3 Partial First Floor Plan North HVAC Phase 1 Partial First Floor Plan Short Stay HVAC Phase 1 Partial First Floor Plan North HVAC Phase 2 Partial First Floor Plan North HVAC Phase 3 Partial Second Floor Plan NorthNVest HVAC Phase 1 Partial First Floor Plan North Plumbing /Piping Phase 1 Partial First Floor Plan Short Stay Plumbing /Piping Phase 1 Partial First Floor Plan North Plumbing /Piping Phase 2 Partial First Floor Plan North Plumbing /Piping Phase 3 Partial Second Floor Plan North/West Plumbing /Piping Phase 1 Partial Third Floor Plan North/West Mechanical Phase 1 Partial Roof Plan North/West Mechanical Phase 1 Partial Roof Plan Short Stay Mechanical Phase 1 Partial Roof Plan North/West Mechanical Phase 2 Partial Roof Plan North/West Mechanical Phase 3 Enlarged Plans Enlarged Plans Fire Protection Plans Fire Protection Plans M6 1 Diagrams M6.2 Medical Gas Piping Diagrams M6 3 Plumbing Diagrams Fsi #97007 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDTITONS ALTERATIONS PART1 GENERAL SECTION 15010 PAGE 1 GENERAL PROVISIONS 1.1 WORK INCLUDED A. Work includes complete mechanical systems shown on the plans and specified. The Bid and Contract Documents and General Requirements of the specification are a part of this division of the specification. Where the word "provide" is used, it means "furnish and install complete and ready for use' Provide supervision, labor, material, equipment, and machinery necessary to complete the mechanical systems. Provide finished work, tested and ready for operation. 1.2 DRAWINGS A. Drawings are diagrammatic, indicating the general arrangement of systems and work, and do not attempt to show exact details or all offsets in piping and ductwork. Do not scale drawings. Examine the architectural drawings for exact location of fixtures and equipment. Where they are not definitely located, obtain this information from the Architect. B. Follow drawings in laying out work and check drawings of other trades to verify spaces in which work will be installed. Maintain maximum headroom. If space conditions appear inadequate, notify the Architect before proceeding with the work. Make reasonable modifications in the work without extra cost as needed to prevent conflict with work of other trades and for proper execution of the work. 1.3 EQUIPMENT DEVIATIONS A. Specific manufacturers and model numbers are noted to indicate a standard of design and are not intended to be restrictive. B. Approval of alternative and/or substitute products will be considered only under terms and conditions specified in Division 1. C. When submitting an alternative and/or substitute product, Contractor shall include complete product literature of original specified item. D Provide redesign to any part of the work resulting from the use of equipment and material other than specified or shown on the drawings. Obtain approval of redesign from the Architect. Redesign cost and additional construction cost resulting from the redesign shall be at the Contractor's expense. 1.4 SHOP DRAWING AND SUBMITTAL DATA A. Check and verify field measurements and requirements. Submit promptly, so as not to delay the work, six (6) copies, checked and approved by the Contractor, of all shop drawings, submittal data, and layout drawings listed below The Architect will check and review with reasonable promptness the shop drawings and submittal data only for conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Make corrections required by the Architect and re- submit to the Architect six corrected copies. The Architect's review of the shop drawings and submittal data shall not relieve the Contractor from responsibilities for deviation from the Contract Documents unless the Contractor has in writing called to the Architect's attention deviation at the time of submission and secured the Architect's written approval, nor shall it relieve the Contractor from responsibility for errors in the shop drawings and submittal data. B. The shop drawings and submittal data for the material and equipment listed below shall be submitted at one time. Each copy shall be in a three ring binder, indexed, properly labeled indicating specific material or equipment for which it is to be used and the specification section and paragraph number MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS relating to the submitted item. C. Review, approve and stamp shop drawings and submittal data before submission to the Architect. Notify the Architect in writing of any deviation from the requirements of the Contract Documents. D. Failure to submit shop drawings and submittal data in ample time for checking and review shall not entitle the Contractor to an extension of contract time. E. Prepare detail layout drawings to a larger scale than the Contract drawings for all piping and sheetmetal work in Mechanical Rooms and in other areas where the work is of sufficient complexity or space constraints to warrant additional detailing. Prepare these drawings on tracings of the same size as the Contract drawings and submit with each set of the Owner's record drawings. In general, do not submit these drawings for review When directed by the Architect, submit Layout drawings for review before commencing shop fabrication or field erection. F Submit shop drawings, submittal data and layout drawings on the following equipment: Air Conditioning Units Filters Hot Water Heating Coils Air Distribution Components Medical Gas Equipment Controls Plumbing Fixtures Air Distribution Systems Fire Protection System Sprinkler Heads 1.5 CODES AND STANDARDS 1.6 COOPERATION WITH OTHER TRADES SECTION 15010 PAGE 2 GENERAL PROVISIONS A. Give necessary notices, obtain permits and pay taxes, fees and other costs, including utility connections or extensions for the work. File necessary plans, prepare documents and obtain necessary approvals of governmental departments having jurisdiction. Obtain required certificates of inspection for work and deliver to the Architect before request for acceptance and final payment for the work. B Comply with laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the performance of the work. If the Contractor observes that any of the Contract Documents are at variance therewith in any respect, he shall promptly notify the Architect in writing and any necessary changes shall be accomplished by appropriate modification. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without notice to the Architect, he shall assume full responsibility, and shall bear all costs. C. Material and equipment within the scope of the UL Testing Laboratory Service shall be listed by the Underwriters' Laboratories for the purpose for which they are used and shall bear their listing mark. A. Give full cooperation to other trades and furnish in writing to other trades, with copies to the Architect, any information necessary to permit the work of all trades to be installed satisfactorily and with the least possible interference or delay MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDTITONS ALTERATIONS SECTION 15010 PAGE 3 GENERAL PROVISIONS B Where mechanical work will be installed in close proximity to, or will interfere with work of other trades, assist in working out space conditions to make a satisfactory adjustment. Prepare composite working drawings and sections at a suitable scale, not less than 1/4 -inch 1-foot 0- inches, clearly showing how the mechanical work is to be installed in relation to the work of other trades. If work is installed before coordinating with other trades, or if it causes any interference with work of other trades, make the necessary changes in the work to correct the conditions and bear all costs. C. Furnish to other trades necessary templates, patterns, setting plans and shop details for the proper installation of work and for the purpose of coordinating adjacent work. 1.7 PROTECTION A. Protect work and material from damage and be liable for damage. B Be responsible for work and equipment until finally inspected, tested and accepted; protect work against theft, injury or damage; and carefully store material and equipment received on site which are not immediately installed. Close open ends of work with temporary covers or plugs during storage and construction to prevent entry of obstructing material. 1.8 SCAFFOLDING, RIGGING AND HOISTING A. Provide ladders, scaffolding, rigging, hoisting and services necessary for delivery into the premises and erection of any equipment and apparatus and execution for the work. Remove same from premises when no longer required. 1.9 EXCAVATING AND BACKFILLING A. Mass excavation to approximate building levels will be done by the General Contractor. The Mechanical Subcontractor shall do trench and pit excavation and backfilling required for mechanical work, inside and outside the building, including repairing of finished surfaces, required shoring, bracing, pumping and protection for safety of persons and property The Mechanical Subcontractor shall remove excess earth resulting from his work from the site. Local or State safety codes shall be strictly observed. Check the elevations of the utilities entering and leaving the building. If such elevations require excavations lower than the footing levels, notify the Architect of such conditions before excavations are commenced. Make the excavations at the minimum required depths to not undercut the footings. B. Filling, Backfilling and Compaction: 1. General. Remove debris and decayable matter from areas to be filled before proceeding. Use only materials approved by the Architect for fills. Obtain Architect's approval before filling against concrete or masonry walls. Make fills as soon as feasible to insure maximum settlement. 2. Compaction of fills: Compact by ASTM D -1557 Method "A 95 percent density under paved areas and building areas to 10 feet beyond building perimeter, 90 percent elsewhere. Place fills in lifts which, when compacted, shall not exceed 8- inches in depth and compact with multiple wheeled pneumatic -tired rollers or other approved methods. Fills made from cuts shall be made and compacted in one operation so that the material is not left exposed to rain while in an uncompacted state. 3. Fills under interior slabs: 4- inches of 3/4 -inch to 1 -1/2 inches washed gravel, evenly graded. Cover with reinforced Kraft paper, Brownskin, Sisalkraft or approved substitute. Lap joints fl- inches, turn up 4- inches onto vertical surfaces. Repair any punctures in membrane before pouring concrete. Place 12- inches of washed gravel under plenums. 4 Fills against concrete walls where walls are dampproofed: Fill to be material from excavations, MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1.10 MATERIAL AND WORKMANSHIP A. Materials and equipment required for the work shall be new and shall be furnished, delivered, erected, installed, connected and finished in every detail; and shall be selected and arranged to fit properly into the building spaces. Where no specific kind or quality of material is given, an article as approved by the Architect shall be provided. B. Furnish the services of an experienced superintendent, who shall be constantly in charge of the work. C. Equipment and materials shall be installed with the approval of the Architect in accordance with the recommendations of the manufacturer. This includes the performance of such tests as the manufacturer recommends. 1.11 MOTORS approved by the Architect. SECTION 15010 PAGE 4 GENERAL PROVISIONS A. Motors shall be built in accordance with the latest standards of NEMA and as specified. Motors shall be tested in accordance with the standards of ASA C50 and conform for insulation resistance and dielectric strength. Each motor shall be provided with conduit terminal box, adequate starting and protective equipment as specified or required. The capacity shall be sufficient to operate associate driven devices under all conditions of operation and load and without overload, and at the horsepower indicated or specified. Each motor shall be selected for quiet operation. B Overload capacity shall be 110 percent (service factor 1.15 minimum) for motors. Sizing of motors shall not include the overload factor C. Motor types shall be as follows: 1 Three -phase motors: Induction -type, single speed, unless indicated otherwise. 2. Single -phase motors: Split -phase or capacitor -start type as recommended by the manufacturer for the particular piece of equipment, single -speed unless indicated otherwise. D Motors shall be General Electric, Westinghouse, Allis Chalmers, Reliance, Century or approved substitute. E. Motors and equipment shall be provided for current characteristics as shown on the electrical drawings. F Magnetic motor starters, disconnect switches and thermal heaters shall be furnished and installed by the Electrical Subcontractor. G. Motors shall be high efficiency, copper wound. 1.12 ACCESSIBILITY A. Install the work with adequate clearances throughout the project, including being responsible for the sufficiency of the size of shafts, chases, double partitions and suspended ceilings. Cooperate with other trades where work is in the same space. Such spaces and clearances shall be kept to the minimum size required. B. Locate all equipment which must be serviced, operated or maintained in fully accessible positions. Minor deviations from drawings may be made to allow for better accessibility and any change shall be approved by the Architect. C. The Mechanical Subcontractor shall provide the General Contractor the exact locations of access MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15010 PAGE 5 GENERAL PROVISIONS panels for each concealed valve, control damper or other device requiring service. Access panels will be provided and installed by the General Contractor and as specified in the other divisions of the specifications. Submit locations of these panels in sufficient time to be installed in the normal course of work. 1.13 ELECTRICAL CONNECTIONS A. The Electrical Subcontractor shall provide wiring, except temperature control wiring, equipment control wiring and interlock wiring. The Electrical Subcontractor shall provide power wiring complete from power source to motor or equipment junction box, including power wiring through starters. Electrical Subcontractor shall provide starters and disconnect switches not factory- mounted on equipment. B The Mechanical Subcontractor shall, regardless of voltage, provide temperature control wiring, interlock wiring and equipment control wiring for the equipment that the Mechanical Subcontractor furnishes or installs. C. The Electrical Subcontractor shall be responsible for power wiring. Control wiring shall be the responsibility of the Mechanical Subcontractor. Motors and equipment shall be provided for current characteristics as shown on the electrical drawings. 1.14 CUTTING AND PATCHING A. Provide drilling, coring, cutting and patching necessary to install the work specified in this division. Patching shall match adjacent surfaces. B No structural members shall be cut without the approval of the Architect, and cutting shall be done in a manner directed by him. Do not damage or endanger any portion of the project or work of the Owner or any other separate contractor by drilling, coring, cutting, patching, excavating and backfilling. C. Inform the General Contractor and other subcontractors affected of requirements for cutting and patching. 1.15 TEMPORARY HEAT A. The building heating system may be utilized as early as possible for temporary heat, following checkout and testing of the equipment and with the consent of the Architect. B. Provide inlet air filters on building fan equipment and return duct openings used for temporary heat. Clean the equipment and replace filters before heating systems and the project are put into regular operation. 1.16 BOXES, SLEEVES AND CHASES A. Inform the General Contractor of requirements for boxes, sleeves and chases The General Contractor shall set boxes, sleeves and chases. Furnish General Contractor with the boxes and sleeves and be responsible for informing General Contractor of required location. 1.17 OPERATING INSTRUCTIONS A. Upon completion of the work, furnish the necessary skilled labor and helpers for operating the systems and equipment for a period of three (3) days of eight (8) hours each, or as otherwise specified. During this period, instruct the Owner or his representative fully in the operation, adjustment and maintenance of all equipment furnished. Give at least forty-eight (48) hours notice to the Owner in advance of this period. MAHLUM NORDFORS MCIUNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15010 PAGE 6 GENERAL PROVISIONS B. Furnish to the Architect two (2) complete bound sets of typewritten or blue printed instructions and parts lists for operating and maintaining all systems and equipment furnished. Submit one copy of the information in draft form to the Architect for approval prior to final issue. Manufacturers' advertising literature or catalogs will not be acceptable. Include manufacturers' printed warranties and maintenance instructions referring specifically to the equipment installed, with extraneous matter removed or neatly marked out. 1.18 TEMPERATURE CONTROL DIAGRAMS A. Laminate in plastic temperature control diagrams, piping diagrams, valve list and color code. Include these with the 0 M Manuals. 1.19 RECORD DRAWINGS A. Provide blue line record drawings of any buildings or plot plans on which any mechanical work deviates from the plans, including changes resulting from addenda and change orders. Neatly draft changes to show the work clearly in the actual locations as built. Obtain drawings from Architect from which to make the record drawings. 1.20 CLEANING A. Promptly remove waste material and rubbish caused by the work. At Completion of the work, clean dirt and debris from the mechanical installation, including equipment, piping, ductwork and plumbing fixtures. B. Upon completion of the project and after cleaning is complete and before project is air balanced, provide clean air filters throughout. 1.21 WARRANTY A. All work, material and equipment to be free from defects. Correct all defects and failures occurring within one year from date of final acceptance without cost to the Owner except when such failure is due to neglect or carelessness by the Owner, as determined by the Architect. B The warranty disregards shorter time limits by any manufacturer of equipment provided. C. Make all necessary adjustments and corrections during first year of operation. The fact that the Architect was present during any construction does not relieve the Contractor from responsibility for defects discovered after completion of the work. 1.22 ASBESTOS A. This project is not expected to require work in the presence of asbestos fibers. These Bid Documents do not provide for or cover the identification, removal, encapsulation, or disposition of such materials. The Contractor is cautioned that should he encounter suspicious material, to obtain all instructions relative to proceeding with the execution of the work directly and solely from the Owner. 1.23 TESTING A. If the work is completed during the heating season, perform final tests of cooling equipment the following summer, if completed during summer, perform test of heating system the following winter. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PARTS 2 AND 3. PRODUCT AND_ CUTION1NOT APPLIC B END OF SECTION 15010 SECTION 15010 PAGE 7 GENERAL PROVISIONS MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS EARI1 GENERAL 1.1 WORK INCLUDED A. Mechanical Equipment Isolators B. Thrust Restraints C. Flexible Pipe Connectors D Equipment Vibration Isolation Bases E. Pipe and Duct Isolators SECTION 15020 PAGE 1 VIBRATION ISOLATION 1.2 CODES AND STANDARDS A. See Section 0191 Reference Standards 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. PART 2 PRODUCT 2.1 MANUFACTURERS A. Kinetics Peabody Noise Control, Mason Industries, Amber- Booth, Vibrex, Flexonics, or approved substitute. 2.2 FLEXIBLE PIPE CONNECTORS A. Braided type, threaded ends for 2 -inch and smaller, flanged ends for 2 1/2 -inch and larger. B. Stainless steel for steel pipe Flexonics #PCS. C. Bronze for copper pipe Flexonics #PCB. 2.3 PIPE AND DUCT ISOLATORS A. Kinetics Type SFH. 2.4 MECHANICAL EQUIPMENT VIBRATION ISOLATORS A. Rubber Pads 1. Single layer Kinetics Type NPS or NPD 2. Multi-layer Mason Industries Type WMW 3. Multi-layer to receive leveling bolts Mason Industries Type WML. 4 Multi-layer requiring equipment anchoring Mason Industries Type WM. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15020 PAGE 2 VIBRATION ISOLATION B. Glass fiber pad Kinetics Type KIP C. Floor spring mounts Kinetics FDS Series all- welded construction with NPS rubber pad bonded to mounting plate. 1. Unhoused stable spring, with ratio of horizontal to vertical spring constant not less than 1.0, and built -in leveling bolts. Provide springs with an additional overload capacity of 50 percent. D Spring hanger; Kinetics SFH. 1. Unhoused stable spring, with the ratio of horizontal to vertical spring constant not less than 10, and built -in leveling bolts. Provide springs with an additional overload capacity of 50 percent. E. Seismic applications restrained spring mounts Kinetics Type FYS with NPS rubber pad bonded to mounting plate. F Thrust restraint Kinetics HSR. 2.5 MECHANICAL EQUIPMENT BASES A. Structural steel rails Kinetics SBB. B. Integral steel bases Kinetics SFB, SBB or KFB C. Concrete inertia base Kinetics CIB -L for fan rooms and CIB -H for other locations. 1. Provide prelocated equipment anchor bolts and pipe sleeves. 2. Pour bases full of structural grade concrete. 3. Pump bases to support pipe elbows at inlet and outlet of pumps. D Rooftop equipment bases Kinetics ASR with restraints. FART 3 EXECUTION 3.1 ISOLATION EFFICIENCY A. Isolate mechanical equipment in accordance with Table 34, Chapter 42, in the 1995 ASHRAE Handbook HVAC Applications Volume. 1. Select isolators for floor mounted or ceiling hung equipment from the "20 -Foot Floor Span column. 2. Select isolators for roof mounted equipment from the "40 -Foot Floor Span" column. 3 Select isolators for equipment mounted on grade support slabs from the "Grade Supported Slab" column. 3.2 PIPING, DUCTING AND EQUIPMENT A. flexible Connectors 1. Provide flexible pipe connectors at piping connections to equipment mounted or suspended with external vibration isolators and where shown on the drawings. 2. Align bolt holes on flanged flexible connectors with bolt holes in companion flanges to prevent twisting of connector and install threaded flexible connectors to avoid twisting. 3 Do not use flexible connectors to compensate for misalignment of piping. 4 Install flexible connections at right angles to the direction of the vibration to avoid compression MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS and extension of the connector from equipment motion. SECTION 15020 PAGE 3 VIBRATION ISOLATION B. Pipe Sleeves 1. Where pipes pass through walls, ceilings or floors (except slab -on- grade), install pipe sleeves and fill space between pipe and sleeve as specified in Section 15060. C. Pipe and Duct Isolators 1. Provide spring isolators on piping connected to isolated mechanical equipment as follows: up to 4-inch diameter, first 3 points of support; 5 -inch to 8 -inch diameter, first 4 points of support; 10- inch diameter and over, first 6 points of support. 2. Provide spring isolators on ducts where noted on drawings 3. Static deflection of first point shall be twice deflection of isolated equipment. D Equipment Bases 1. Install bases dead level. 2. Install inertia bases with a minimum clearance of 2- inches under base, other bases with a minimum clearance of 1 -inch under base. E. Provide thrust restraints at all in -line vane -axial fans and where shown on the drawings. END OF SECTION 15020 MAHLUM NORDFORS MCKINLEY GORDON SECTION 15030 PAGE 1 OLYMPIC MEMORIAL HOSPITAL MECHANICAL PAINTING AND 2MAINISURGERY ADDITIONS ALTERATIONS IDENTIFICATION FART 1 GIMBAL 1.1 WORK INCLUDED A. Mechanical systems painting B. Mechanical systems identification and flow arrows C. Repainting of factory finished equipment D. Valve tags 1.2 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. 1.3 DEFINITIONS A. "Concealed" work is defined as work installed within pipe shafts, duct spaces, above furred or hung ceilings, or otherwise built into the building and not exposed to view B. "Exposed" work is defined as work in walkway tunnels, Mechanical and Fan Rooms, on building rooftops, all occupied areas and all other areas not defined as "concealed' 1.4 MANUFACTURERS A. General. Acceptable manufacturers are Quigley Cowman and Campbell, Fuller, General Paint, Sherwin Williams, Glidden Manufacture, or approved equal. PART 2 PRODUCTS 2.1 PAINT A. Industrial Enamel: Paint shall be Alkyd base, Quigley AAA, Sherwin Williams "Kem- Lustral Glidden "Daylite" enamel, or approved equal. B Primer for Steel Surfaces: Zinc chromate primer, Cowman Campbell No. 1134 or equal. C. Primer for zinc coated surfaces: Metallic zinc -zinc oxide primer, W.P Fuller No. 7747, Glidden "Rustmaster" or Dupont "Dulux." D. Primer for Asphalt- Coated Surfaces: Bishop Conklin Caladium. E. Primer Sealer for Insulated Surfaces: Resin -type primer sealer. F Heat Resistant Paint: Quigley AAA high temperature paint. 2.2 PIPING IDENTIFICATION BANDS AND FLOW ARROWS A. Seton contact type adhesive backed, Zeston or approved substitute. 1 1/8 -inch wide for lines up sy MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDTITONS ALTERATIONS SECTION 15030 PAGE 2 MECHANICAL PAINTING AND IDENTIFICATION through 3 inch, 2 inch wide for larger pipes. Size and color in accordance with the following chart: Low Pressure Steam Orange, with one (1) 3/4 -inch wide black band 10 -feet o.c. Condensate Orange Gas (natural or LPG) Yellow Oxygen White Air, Medical Vacuum, Medical Green Nitrous Oxide Light Blue Nitrogen Heating Water Light Green Chilled Water Dark Green Refrigerant Piping Gray Domestic Cold Water Dark Blue Domestic Hot Water Maroon Waste, Soil, Vents, Downspout Brown Fire Red Other Services Gray Equipment Gray Ductwork Gray Flow Arrows Black 2.3 VALVE TAGS A. Seton 1 1/2 inch round brass with stamped characters with brass "S" hooks. FART 3 E2CECUTIOLV 3.1 PAINTING A. Paint all exposed mechanical work, including piping and insulated surfaces. B. Color of paint shall match adjacent building surfaces. C. Repaint damaged factory finished equipment. f r 1 s 1 1 1 i y r 1 t MAHLUM NORDFORS MCIINNLEY GORDON SECTION 15030 PAGE 3 OLYMPIC MEMORIAL HOSPITAL MECHANICAL PAINTING AND 2MAIN/SURGERY ADDITIONS ALTERATIONS IDENTIFICATION D Paint all visible surfaces behind grilles dull black. E. Use skilled painters; paints, well mixed; each coat to have slight variation in color from the preceding, for ready identification. F Clean grease, dirt, wax and scale from surfaces before painting. G. Cleaniqg Solvents: Mineral Spirits; remove cleaning solvent cloths from building each day H. Metal Surfaces: 1. In General: 3 mils minimum dry film thickness; apply one priming coat and one finish coat of acrylic base paint and additional coats as required to obtain minimum dry film thickness. 2. High Temperature Surfaces (Steam and Hot Water Heating Equipment): 3 mils minimum thickness; apply one prime coat and one finish coat of heat resistant paint and additional coats as required to obtain minimum dry film thickness. 3. Outside Building: 4 mils minimum thickness; apply prime coat and two finish coats of acrylic base paint and additional coats as required to obtain minimum dry film thickness. I. Insulation Surfaces: 3 mils minimum dry film thickness; apply one coat of primer sealer, and one coat of acrylic base paint and additional coats as required- to obtain minimum dry film thickness. J Grilles, Convector and Finned Radiation Covers: 3 mils minimum thickness; apply spray paint one primer coat and two coats of industrial enamel 3.2 IDENTIFICATION AND FLOW ARROWS A. Identify and provide flow direction arrows on all piping and equipment. B Apply piping identification bands and flow arrows on 10 -foot centers and wherever a pipe leaves or enters any wall, floor, ceiling or foundation. Place the proper band on pipe at each valve, branch connection, manifold, entrance and exit from a tank, vessel, or piece of equipment. Apply after paint work is completed. C. Label each piece of mechanical equipment and system with equipment or system name lettered thereon with 2 -inch high block style black paint letters. D Provide tag on each valve. Tag shall be provided with an identifying number. Post a plastic laminated Valve Index where directed by Architect. Index shall identify location, service and identification number of each tagged valve. END OF SECTION 15030 f 1 1 1 1 r r r t 1 1 MAHLUM NORDFORS MCKINLEY GORDON SECTION 15040 PAGE 1 OLYMPIC MEMORIAL HOSPITAL BALANCING AIR AND WATER 2MAINISURGERY ADDITIONS ALTERATIONS SYSTEMS PAlTJ GENEBAL 1.1 WORK INCLUDED A. Air Systems Balancing B. Water Systems Balancing C. Balancing Reports 1.2 SYSTEMS BALANCING CONTRACTOR A. Systems balancing contractors: Nuedorfer Engineers, United Systems Inc., Hardin Inc., or approved substitute. B. Qualification requirements: 1. Must have minimum five (5) years experience record in systems balancing. 2. Must have sufficient experience on projects similar to this project. Submit lists of projects to demonstrate this experience. 1.3 BALANCING REPORT A. Upon completion of the work, provide the necessary skilled labor, helpers, materials and equipment to support the commissioning work (see Section 15950). During the commissioning, coordinate with the commissioning company and make all adjustments required to demonstrate systems are working properly 1.4 PROCEDURES A. Use procedures in accordance with the Associated Air Balance Council's "National Standard for Field Measurements and Instrumentation Total System Balance", Volume One, No. 81266. B Use instrumentation application methods in accordance with A.A.B.C. or N.E.B.B. procedures 1.5 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. PART 7, ?RODUCT 2.1 BALANCING REPORT A. Provide three (3) sets of balancing reports, two (2) for the Owner and one (1) for the Engineer B Include in report: Project Name, Owner, Engineer, Systems Balancing Subcontractor, other data necessary to describe activity and the status of the systems plus the following data: MAHLUM NORDFORS MCIONNLEY GORDON SECTION 15040 PAGE 2 OLYMPIC MEMORIAL HOSPITAL BALANCING AIR AND WATER 2MAINISURGERY ADDITIONS ALTERATIONS SYSTEMS 1. Fans: a. Installation data: 1) Manufacturer and model 2) Size 3) Arrangement, discharge and class 4) Motor HP, voltage, phase, cycles and full load amps 5) Identification data b. Design data: 1) Total CFM 2) Static pressure 3) Motor HP rpm and amp 4) Fan rpm 5) Fan BHP c. Fan recorded data: 1) CFM 2) Static pressure 3) Rpm 4) Motor operating amp 5) Motor operating BHP 6) Drive sizes (sheaves, belts, and shaft) 2. Duct systems: a. Duct CFM mains, branches, (maximum and minimum) 1) Duct size(s) 2) Number of pressure readings 3) Sum of velocity measurements 4) Average velocity 5) Duct recorded CFM 6) Duct design CFM b. CFM of return and outside air at required maximum return air, at required minimum outside air 3 Individual air terminals: a. Supply return or exhaust terminal identification (location and number designation) b. Manufacturer's catalog identification and type c. Applicable factors for application, velocity area, etc. and designated area d. Design and recorded velocities fpm e. Design and recorded quantities CFM 4 Pumps: a. Installation data: 1) Manufacturer and model 2) Size 3) Type drive 4) Motor HP, voltage, phase and full load amp 5) Identification data b. Design data: 1) Gpm 2) Head 1 I r s 1 1 1 1 i MAHLUM NORDFORS MCIITLEY GORDON SECTION 15040 PAGE 3 OLYMPIC MEMORIAL HOSPITAL BALANCING AIR AND WATER 2MAIN/SURGERY ADDITIONS ALTERATIONS SYSTEMS 3) Rpm 4) BHP and amp c. Recorded data 1) Discharge pressure (full-flow and no-flow) 2) Suction pressure (full-flow and no-flow) 3) Operating head 4) Operating gpm (from pump curves if metering is not provided) 5) No-load amps (where possible) 6) Full-flow amp 7) No-flow amp 8) Calculated BHP 5. Heating and cooling coils: a. Design data and recorded data: 1) MBH 2) GPM 3) Entering and leaving water temperature 4) Entering and leaving air temperature 5) CFM 6) Water pressure drop 7) Air velocity 8) Identification data 9) Air pressure drop 6. Water chillers: a. Installation data: 1) Manufacturer and model 2) Motor HP voltage, phase and full load amp 3) Identification data b. Design and recorded data: 1) GPM 2) Pressure drop through chiller 3) Entering and leaving water (evaporator and condenser) temperature at full load 4) Amps at full load BART 3 EXECUTION 3.1 PROCEDURES A. Obtain approval from the Architect of systems balancing contractor prior to commencing balancing. 3.2 INSTRUMENTS A. Use accurate and recently calibrated instruments. Provide instrument calibration history if requested by the Architect. 3.3 BALANCING AGENDA A. Submit balancing agenda prior to start of work. Include the following in the agenda: 1. General description of each air and water system with its associated equipment and operating cycles for heating and cooling. 2. A complete listing of all flow (air and water) and air terminal measurements to be performed. MAHLUM NORDFORS MCIONLEY GORDON SECTION 15040 PAGE 4 OLYMPIC MEMORIAL HOSPITAL BALANCING MR AND WATER 2MAIN/SURGERY ADDITIONS ALTERATIONS SYSTEMS 3. For each specific procedure specify type of instrument to be used, method of instrument application (by sketch) and air terminal correction factors. 4. Include in agenda sample forms showing application of procedure to typical systems. 3.4 AIR SYSTEM PROCEDURES A. Complete system balancing prior to the final inspection of the building. B Make air quantity measurements in ducts with a Pitot tube traverse of the entire cross sectional area of the duct. C. For ducts having air velocities of 1000 -feet- per minute and higher measure flow with inclined manometers or draft gauges, having suitable scales and increments. D For ducts having air velocities lower than 1000- feet per minute measure flow with micro- manometers, hook gauges, or similar low pressure instruments. E. Volume control devices to regulate air quantities of air terminals only to the extent that adjustments do not create objectionable air motion or sound levels. Volume control by means of air terminal adjustment or duct internal devices other than dampers is not permitted. F Adjust and balance the air system as necessary to accommodate field conditions and occupant comfort. Provide necessary fan adjustments, pulley changes and damper adjustments. 3.5 WATER SYSTEM PROCEDURES A. Complete system balancing prior to the final inspection of the building. B Use calibrated metering fittings and pressure gauges installed in the piping system, in conjunction with the portable type flow meters, to determine water flow rates for system balance. Where flow metering devices are not installed, use temperature differential across the various heat transfer elements in the system to determine flow C. Adjust systems to provide the approved pressure drops through the heat transfer elements prior to the thermal testing. D Perform initial system balance with automatic control valves full open to the heat transfer elements. E. Perform adjustment of water distribution systems by means of balancing cocks. Service valves shall not be used for balancing. F Adjust pressure drop through 3 -way valve by- passes to balance drop through the system and the components served. G. Adjust and balance the water systems as necessary to accommodate field conditions and occupant comfort. H. Provide direction for pump impeller trim or changes necessary to balance the systems. END OF SECTION 15040 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15060 PAGE 1 PIPING AND FITTINGS PAST I GENERAL 1.1 WORK INCLUDED A. Pipe, fittings, and connections. B. Piping specialties. C. Pressure gauges D Pressure/temperature test plugs E. Thermometers 1.2 CODES AND STANDARDS A. All standards refer to the current edition. 1. ANSI/ASTM A53 Pipe, steel, black and hot dipped zinc- coated, welded and seamless. 2. ANSI/ASTM A74 Cast iron soil pipe and fittings. 3. ASTM A795 Black and hot dipped zinc coated (galvanized) welded and seamless steel pipe for fire protection. ANSI/ASTM Al26 Gray iron castings for valves, flanges and pipe fittings. 4 ANSI B9 1- Mechanical refrigeration pipe. 5 ANSI/ASME B 16.3 Malleable -iron threaded fittings. 6. ANSI/ASME B16.4 Cast iron threaded fittings Class 125 and 250. 7 ANSI/ASME B 16.5 Pipe flanges and flanged fittings. 8. ANSI B 16.9 Factory-made wrought steel butt welding fittings. 9 ANSI/ASTM B 16.12 Cast iron threaded drainage fittings. 10. ANSI/ASME B 16.22 Wrought copper and bronze solder joint pressure fittings. 11. ANSI B 16.25 Butt welding ends for pipe, valves, flanges and fittings. 12. ANSI/ASME B 16.29 Wrought copper and wrought copper alloy solder joint drainage fittings DWV 13 ASTM B88 Seamless copper water tube. 14 ANSI/ASTM B306 Copper drainage tube. 15. ANSI/AWWA C111 Rubber gasket joints for ductile iron and gray iron pressure pipe and fittings. 16. ANSI/AWWA C151 Ductile iron pipe, centrifugally cast in metal molds or sand lined molds, for water or other liquids. ANSI/AWWA C104/A21.4 Cement mortar lining. 17 ASTM C564 Rubber gaskets for cast iron soil pipe and fittings. 18. ANSI/AWWA C606 Groovedand shouldered type joints. 19 CISPI No. 301 Cast iron soil pipe and fittings for hubless cast iron sanitary system. 20. FS WW -P -521 Pipe fittings, flange fittings, and flanges: Steel and malleable -iron (threaded and butt welding) Class 150. 21. ASTM A234 Seamless and welded wrought -steel welding fittings. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2■AIN/SURGERY ADDITIONS ALTERATIONS SECTION 15060 PAGE 2 PIPING AND FITTINGS 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. ftRT 2 PRODUCT 2.1 PIPING SYSTEMS A. All material in conformance with the standards listed in 2.01. 1. Domestic Water Service(Below ground): a. Pipe: Galvanized steel, Schedule 40, ANSI/ASTM A53 b. Fittings: Galvanized malleable iron, threaded, ANSI/ASTM B 16.3 2. Domestic Water Piping (Above Ground): a. Pipe: Type L hard copper, ASTM B88. b. Fittings: Wrought copper or bronze soldered, ANSI/ASME B75 3. Domestic Water Piping (Below Ground Inside Building): a. Pipe: Galvanized steel, Schedule 40, ANSI/ASTM A53. b. Fittings: Galvanized malleable iron, threaded, ANSI/ASTM B16.3. 4 Soil/Waste Pipe (Above Ground): a. Pipe: Galvanized steel, Schedule 40, for piping 2 -1/2 -inch and smaller Service weight coated cast iron, bell and spigot or no-hub for piping 3 -inch and larger At Contractor's option and where code permits, DWV copper drainage pipe may be used. ANSI/ASTM Al20, A74, B306 and CISPI 301. b. Fittings: Black cast iron threaded drainage pattern for galvanized pipe. Service weight coated cast iron bell and spigot or no-hub fittings, coupling, shields and clamp assemblies. Wrought copper solder joint drainage fittings for DWV tube. ANSI/ASTM A74, B16.12, ANSI/ASME B 16.29 and CISPI 301 5 Soil/Waste Piping (Below Ground): a. Pipe: Service weight coated cast iron, bell and spigot or cast iron no-hub pipe, ANSI/ASTM A74 and CISPI 301. b. Fittings: Service weight coated cast iron bell and spigot or no-hub fittings, couplings and shield and clamp assemblies, ANSI/ASTM A74 and CISPI 301. 6. Vent Piping (Above Ground): a. Pipe: Galvanized steel, Schedule 40; or service weight coated cast iron, bell and spigot no- hub pipe. At Contractor's option, DWV copper drainage pipe may be used, ANSI/ASTM A53, A74, B306 and CISPI 301. b. Fittings: Black cast iron threaded drainage pattern for galvanized pipe. Service weight coated cast iron bell and spigot or no-hub fittings, couplings, shields and clamp assemblies. Wrought copper solder joint drainage fittings for DWV tube, ANSI/ASTM A74, B16.12, ANSI/ASME B16.29 and CISPI 301. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15060 PAGE 3 PIPING AND ¥ti H IGS 7 Vent Piping (Below Ground): a. Pipe: Service weight coated cast iron, bell and spigot or no-hub pipe, ANSI/ASTM A74 and CISPI 301. b. Fittings: Service weight coated cast iron bell and spigot or no-hub fittings, couplings and shield and clamp assemblies, ANSI/ASTM A74 and CISPI 301. 8. Rainwater Leader Piping: Pipe and fittings shall be as specified for waste piping above except as follows. a. Exposed Pipe: Galvanized steel, Schedule 40, ANSI/ASTM A53. b. Exposed Fittings: Black cast iron threaded drainage pattern for galvanized pipe. 9 Hot Water Heating Piping: a. Pipe: Black steel, Schedule 40, ANSI/ASTM A53, Grade B. b. Fittings: Black malleable iron, 150 lb. threaded for piping smaller than 2 1/2 -inch, ANSI/ASME A197 Steel butt welding fittings for piping 2 -1/2 -inch and larger, with 150 lb. forged steel flanges, ASTM A234, Grade WPB and ANSI/ASTM B 16.5. c. "Weldolets" may be used in lieu of tees when branch size is smaller than the main size, ASTM A234 10. Steam Piping (Pressure less than 125 psi): a. Pipe: Black steel, Schedule 80, ANSI/ASTM A106, Grade B. b. Fittings: Cast iron, 150 -1b. threaded for piping smaller than 2 -1/2 -inch, ANSI/ASME B16.3 Wrought steel butt welding fittings for piping 2 112 -inch and larger, with 150 -1b. forged steel flanges, ASTM A234, Grade WPB and ANSI/ASTM B16.9 c. "Weldolets" may be used in lieu of tees when branch size is smaller than the main size, ASTM A234 11 Low Pressure Steam and Condensate Piping (Pressure less than 125 psi): a. Pipe: Seamless black carbon steel, Schedule 80, ASTM A53, Grade B for sizes up to 2' Electric- resistance welded carbon steel, standard weight, ASTM A53, Grade B for sizes up to24' b. Fittings on piping below 15 feet above fmished floor level. Forged carbon steel, Class 2000, threaded, ASTM A105, ANSI B16.11 for piping smaller than 2 1/2 -inch. Wrought carbon steel, same wall thickness as the pipe, butt welding, seamless, ASTM A234, Grade WPB and ANSI B16.9 for piping 2 -1/2 -inch and larger with 150 lb. forged steel flanges, with raised face, slip-on or weld neck, ASTM A105, ANSI B 16.5 c. Fittings on piping above 15 feet above finished floor level: Same as above, except fittings smaller than 2 -1/2 -inch shall be Class 3000 socket welded. d. Sockolets and Threadolets: Forged carbon steel, Class 3000, ASTM A105 up to 2 -inch size. Same for larger sizes, except weight to match run and branch. e. Unions: Forged carbon steel, Class 3000 socket welded or Class 2000 threaded, ground joint, ASTM A105 f. Bolting and Gasketing: ASTM A193, Grade B7 alloy steel stud bolts with ASTM A194 Grade 2H heavy hex nuts. Gaskets shall be ring type for Class 150 raised face flanges, 1/16 inch thick, compressed SBR binder with non asbestos filler (700 degree F rating). Garlock Inc., Blue -Gard Style 3200 /3400, or approved equal. 12. Condensate Piping: MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15060 PAGE 4 PIPING AND FITTINGS a. Pipe: Black steel, Schedule 80, ANSUASTM A106, Grade B b. Fittings: Black malleable iron, 150 lb. threaded for piping smaller than 2 1/2 -inch, ANSI/ASME A197 Wrought steel butt welding fittings for piping 2 -1t2 -inch and larger, with 150 -1b. forged steel flanges, ASTM A234, Grade WPB and A105. c. "Weldolets" may be used in lieu of tees when branch size is smaller than the main size, ASTM A234 13. Chilled Piping: a. Pipe: Black steel, Schedule 40, ANSUASTM A53, Grade B. b. Fittings: Black malleable iron, 150 lb. threaded for piping smaller than 2 -1/2 -inch, ANSI/ASME A197 Wrought steel butt welding fittings for piping 2 -1/2 -inch and larger, with 150 -1b. forged steel flanges, ASTM A234 and ANSUASTM B 16.5. c. At Contractor's option for piping 2 -1/2 -inch and larger, grooved piping and mechanical pipe coupling system ANSUAWWA C606 Victaulic Style 77 Gustin Bacon, Gruv -lok, ITT Grinnell, or approved substitute. d. At Contractor's option for piping 3 -inch and smaller 1) Pipe: Type L hard copper, ASTM B88. 2) Fittings: Wrought copper or bronze soldered, ANSI/ASME B75 e. "Weldolets" may be used in lieu of tees when branch size is smaller than the main size, ASTM A234. 14 Mechanical Refrigeration Piping: a. Pipe: ACR Type L hard copper, cleaned, dehydrated, and seal ends, ANSI B9 1 b. Fittings: Wrought copper or bronze solder fittings, except refrigerant flare fittings may be used for connections to equipment with flare connections, ANSI/ASME B75 15 Cooling Unit Condensate Drain Piping: a. Pipe: Type L hard copper tube 1 -inch and smaller, ASTM B88. DWV copper 1 1/4 -inch and larger, ANSUASTM B306. b. Fittings: Wrought copper or bronze solder pressure fittings for Type L tube, ASTM B88. Wrought copper solder joint drainage fittings for DWV tube, ANSI/ASME B 16.29 16. Fire Sprinkler Piping: a. Pipe: Black steel, Schedule 40, 2 -inch and below, above 2 -inch in accordance with NFPA- 13 b. Fittings: Cast iron threaded cast iron flanged, or grooved rubber gasketed flexible couplings, elbows and tees. c. All pipe and fittings in strict accordance with ANSUASTM Standards listed in NFPA -13. d. Welding permitted per NFPA -13. 17 Acid Waste and Vent Piping (Above Ground): a. Pipe: Polypropylene Schedule 40 flame retardant, ASTM D2146. b. Fittings: Mechanical joint threaded type, drainage pattern, ASTM D2146. c. Lab Line/Enfield, GSR- Fuseal by R S Sloan, or approved substitute. 18. Medical Vacuum Piping: a. Pipe: Type L hard copper, ASTM B88. 1 i I 1 1 1 1 1 1 1 r t 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPTTAL 2MAIN/SURGERY ADDITIONS ALTERATIONS b. Fittings: Wrought copper or bronze soldered, ANSI/ASME B75 19 Medical Oxygen: a. Pipe: Type K hard copper, ASTM B88. b. Fittings: Wrought copper or bronze soldered, ANSI/ASME B75. 20. Medical Compressed Air: a.' Pipe: Type L hard copper, ASTM B88. b. Fittings: Wrought copper or bronze soldered, ANSI/ASME B75 21. Distilled Water Piping/Deionized Water Piping: a. Pipe: Polypropylene Schedule 80, capable of maintaining 18 megohm water purity, ASTM D2247 b. Fittings: Polypropylene threaded or fusion socket, ASTM D1785. c. Cabot Piping Systems, Celanese Piping Systems, Orion Fittings Inc. GSR/R S Sloane, or approved substitute. d. Teflon tape for threaded fittings. 2.2 UNIONS A. Copper tube, Sweat, Nibco #733, Grinnell-ITT #9730, EPC #4733. B. Steel pipe, threaded 2 -inch and under, malleable -iron 250 -lb. ground joint. C. Steel pipe, welded 2 -1/2 -inch and over, flange unions 150 -1b. forged steel. D Dielectric unions, soldered to threaded 2 -inch and below, flanged 2 -1/2 -inch and above. Select gasket for pressure and temperature range of service. Capitol Series CS or F Epco "Dielectric Union" E. Fuel oil pipe, ground ball joint type, bronze to bronze seats, Dart unions. 2.3 PIPE FLANGE BOLTS A. Domestic water, process water, low pressure air, utility vacuum, hot water, low pressure condensate and high pressure condensate shall be ASTM A307, Grade B Steam and high pressure air shall be ASTM A193, Grade B7 High volume vacuum shall be ASTM A193, Grade B8. High temperature exhaust shall be ASTM A193, Grade B8M. 2.4 CAST -IN -PLACE PIPE SLEEVES SECTION 15060 PAGE 5 PIPING AND FITTINGS A. Sleeves in walls below grade: Link -Seal modular wall and casing seal. B Sleeves in concrete floor slabs above grade and concrete roofs: 20 -gauge galvanized sheet steel with lock seam joints, or pre- formed factory- fabricated plastic sleeves. C. Sleeves through concrete beams and concrete, masonry or tile walls above grade: Schedule 40 galvanized steel pipe sleeves. 2.5 PIPE SEALS A. Fire stopping seals USG Interiors Inc., Thermafiber Safmg insulation and Thermafiber Smoke Seal. 2.6 PRESSURE GAUGES MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS A. Trerice No. 600 series, Weksler, Marsh or approved substitute. B 4-1/2 -inch dial, cast aluminum case without back flange. C. Scale shall be selected appropriate to the usage. D Gauges for use on water services shall be installed with Trerice 735 needle valve and Ray Model 1 snubber. 2.7 PRESSURE EMPERATURE TEST PLUGS A. Sisco P/T Plugs. B. Valve core and body suitable for 300 degrees F C. 1/2 -Inch size. D Test Kit 2- 2.5- 2GA -2T complete. 1. Two (2) dial face gauge. 2. Two (2) stainless steel gauge adapter, size to match valve core/body 3. Two (2) dial face thermometer 4 Select suitable temperature and pressure ranges for system requirements. 2.8 THERMOMETERS A. Industrial, adjustable angle, 7 -inch aluminum case, red mercury type, separable socket. B Scale shall be selected appropriate to the usage. Range No. Range 01 40to110 02 0 to 100 03 30 to 130 04 0 to 160 06 30 to 180 07 30 to 240 C. Trerice A00 Series or approved equal of Princo, Weiss or Palmer. 2.9 ESCUTCHEON RINGS A. Chrome- plated split ring type. B. Deep recessed type on pipes with sleeves through floor which extend above finished floor line to conceal pipe sleeve. IRT 3 EXECUTION 3.1 GENERAL INSTALLATION REQUIREMENTS A. Keep openings in piping and ends of pipe closed during installation. SECTION 15060 PAGE 6 PIPING AND FITTINGS MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL MAD/SURGERY ADDITIONS ALTERATIONS 3.2 WELDED PIPE JOINTS SECTION 15060 PAGE 7 PIPING AND FITTINGS B. Provide for all expansion, locating offsets and spring pieces where necessary C. Ells shall be long radius. D. Change size in piping with reducing couplings; bushings not acceptable. E. Install all piping parallel with the building and other piping. F Cut pipe accurately to measurement established on building and work into place without springing or forcing. G. Piping installed on fill, excavated areas and backfill shall be adequately supported on beams supported by the building structure and undisturbed earth. H. Install piping concealed in finished rooms, unless indicated otherwise. I. Provide pressure/temperature test plugs at supply and discharge of each coil, on each side of control valves, at balancing cocks, where indicated on the drawings, and in any location requiring system balance information. J. Install exposed work neatly and workmanlike; run pipes parallel to the closest wall; maintain maximum headroom, avoid light fixtures. K. Correct piping leaks immediately; use new materials; leak sealing compounds or peening not permitted. A. Qualifications and Procedures: 1 Piping joints on all steam and condensate piping shall be welded using procedures, welders and welding operators qualified in accordance with ASME B31.1, and applicable state labor requirements. No welding shall proceed until procedures and personnel have been approved as qualified. The contractor shall submit copies of certified reports of welders qualification tests and welding procedures to the owner's Representative/Engineer for approval at least 21 days prior to the start of work. 2. Piping joints on all piping other than steam piping shall be welded using procedures, welders and welding operators qualified in accordance with ASME B31.9, *the Boeing Fire Department and applicable state labor requirements. As described in ASME B31.9 qualifications of welding procedures and personnel certification reports are the Contractor's responsibility and shall be supplied to the Owner's Representative/Engineer for approval at least 21 days prior to the start of work. 3 Employ only welders holding one of the following certificates, dated within the preceding 3 months or dated earlier with documented records indicating acceptable continuous welding has been performed since certificate was issued. a. Certificate of the National Certified Pipe Welding Bureau. b. Certificate from a recognized testing laboratory indicating satisfactory welding test results in accordance with ASME Boiler and Unfired Pressure Vessel Code, Section 9, "Welding Qualifications" If in the opinion of the Owner's Representative/Engineer the work of a welder creates a reasonable doubt as to his skill, additional tests may be ordered by the Owner's Representative/Engineer at the Contractor's expense. 4 Safety Standards: Welding practice shall comply with the latest edition and amendments of MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15060 PAGE 8 PIPING AND FITTINGS ANSI Z49 1 "Safety in Welding and Cutting" 5. Where welders make additions to an ASME stamped product in the field (i.e., boiler tank, etc.), welders must be tested and qualified under the requirement of the ASME Boiler and Pressure Vessel Code. B. Welding: 1. Beveling: Field or shop bevel by mechanical means or flame cutting. Where beveling is done by flame cutting, thoroughly clean surface of scale and oxidation just before welding. Bevel to conform to recognized standards. 2. Alignment Girth butt welds and welded branch connections. Complete penetration welds shall be made without backing rings. 3 Socket Welds: Use socket welds on piping 2 inches and smaller. Cut and ream pipe ends to provide straight end surface free of burr 4 Defective welds will not be accepted. Defective welds are those which fail to comply with ANSI B31.1, and those which result in leakage during testing of piping. Defective welds shall be corrected by the Contractor at no additional cost to the Owner Pipe and fittings with defective welds which cannot be satisfactorily corrected, as determined by the Owner's Representative /Engineer, shall be replaced with new pipe and fittings at no additional cost to the Owner. 5. Electrodes: Store electrodes in a dry heated area. Keep free of moisture and dampness during fabrication operations. Discard electrodes that have lost part of their coating. Use low hydrogen type E7018, or equal. Use E6010 SMAW or ER705 -2 GTAW filler metal for root pass on open butt welds. 6. Welds shall be thoroughly fused and otherwise sound throughout. Contours shall be uniform with regular even ripples. Surfaces shall not be dressed, smoothed or otherwise finished to improve their appearance, except as necessary to correct defects. Welds shall be free from gas pockets, oxides, slag inclusions and surface porosity, except very small pores. Oxides and slag will be permitted if widely dispersed. Welds shall be free from overlaps, undercuts and excessive convexity Internal surfaces of pipe and fittings shall be free from weld metal globules or other inward protrusions at the welded joints. C. Examination of Welds: 1 Welds containing pressures 125 psi and over Perform fit -up, root pass, and final visual inspections in accordance with ASME B31.1. 2. Welds containing pressures less than 125 psi: Final visual inspection in accordance with ASME B31.1. 3. Inspection records: In accordance with ASME B31.1. 3.3 THREADED PIPING JOINTS A. Ream all pipe to full diameter B Use pipe dope or Teflon tape on male threads of all threaded joints. C. Close nipples not permitted. D Full cut threads and make up joints with no more than three threads exposed. E. Do not caulk threaded joints to stop leaks. 1 ti I r 1 1 1 1 t i 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 COPPER PIPING JOINTS A. Ream thoroughly to remove all burrs. B. Polish contact surfaces of fittings and pipes with emery cloth, sandpaper or steel brush, and wipe clean before fluxing male and female surfaces of joints. C. Steel wool not permitted for polishing. D Sil -fos or Sil-braz on all underground work. E. 95 -5 solder, lead free Bridgit or Silvabrite solder for above ground joints. F Take care to avoid burning of piping. G. Provide solder unions, ground joint or flanged joints where necessary for access to equipment. H. Coordinate installation of unslit insulation with piping installation for refrigeration piping. See section 15070 Mechanical Systems Insulation. 3.5 MECHANICAL PIPING JOINTS SECTION 15060 PAGE 9 PIPING AND FITTINGS A. Groove pipe for mechanical grooved joints in accordance with the manufacturer's specifications contained in the latest published literature. B Fabrication techniques for all mechanical joints in accordance with manufacturer's recommendations contained in the latest published literature. 3.6 CAST IRON BELL AND SPIGOT PIPING JOINTS A. Make joints up with double sealed elastomeric compression -type gaskets conforming to ASTM C564 or no-hub couplings, shields, and clamp assemblies. 3.7 UNIONS A. Provide unions at all connections to equipment and where necessary to disconnect for repairs. B Use union fittings wherever practicable to save joints. C. Provide dielectric unions between iron and copper pipe. 3.8 CAST -IN -PLACE PIPE SLEEVES A. Provide and locate all sleeves and inserts required before the floors and walls are built, or be responsible for the cost of cutting and patching required for pipes where sleeves and inserts were not installed, or where incorrectly located. B Provide sleeves for all mechanical piping passing through concrete floor slabs or roof slabs and concrete, masonry and tile wall construction. C. Where pipe motion due to expansion and contraction or earthquake will occur, make sleeves of sufficient diameter to permit free movement of pipe. Where sleeves pass insulated pipes, size the sleeves large enough to pass the pipe only Butt insulation against the construction except for pipes requiring insulation having a vapor barrier, in which case size the sleeves large enough to pass the pipe and insulation. Check floor and wall construction finishes to determine the proper length of sleeves for various locations; make actual lengths to suit the following: MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1. Terminate sleeves flush with walls, partitions and ceiling. 2. In areas where pipes are concealed, as in chases, terminate sleeves flush with floor. 3. In all areas where pipes are exposed, extend sleeves 1 /4-inch above finished floor, except in rooms having floor drains, where sleeves shall be extended 3 /4-inch above floor. D Fasten sleeves securely in floors, roofs and walls so that they will not become displaced when concrete is poured or when other construction is built around them. Take precautions to prevent concrete, plaster, or other materials from being forced into the space between the pipe and sleeve during construction. 3.9 PIPE SEALS AND ESCUTCHEON RINGS SECTION 15060 PAGE 10 PIPING AND FITTINGS A. Fill annular space at pipes with fiberglass batt insulation to a compressed fit, except at fire wall, floor and roof penetrations. At fire wall, floor and roof penetrations, fill annular space at pipes with USG Interiors Inc. Thermafiber Safing insulation and 2 -inch minimum coating of Thermafiber Smoke Seal. B. Provide escutcheon rings for all exposed uninsulated pipes passing through walls, floors and ceilings. END OF SECTION 15060 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PAID GENERAL 1.1 WORK INCLUDED A. Pipe Insulation B. Duct Insulation C. Equipment Insulation 1.2 CODES AND STANDARDS A. General 1. NFPA 90A and 90B, UL -181 (Class 1) and UL -723 B. For Elastomeric Material 1. ASTM E -84-75 SECTION 15070 PAGE 1 MECHANICAL SYSTEMS INSULATION C. For Flame Spread and Fuel Contributed and Smoke 1. UL Standard No. 723, NFPA Standard No. 255 and ASTM Standard No. E -84 13 RELATED WORK A. All portions of specification Division 1 apply to this work. B. All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. PART 2 PRODUCT 2.1 GENERAL A. Materials shall be of the highest grade. Adhesives, sealers, vapor coatings, etc. shall be compatible with the materials to which they are applied, and shall not corrode, soften or otherwise attack such material in either the wet or dry state. Scrap pieces of insulation shall not be used where a full section will fit. Glass fiber materials which become wet or damaged during installation shall be removed and replaced with new materials. Acceptability of a manufacturer is not to be taken as acceptability of his "usual' or "regular" accessory materials such as facings, adhesives, etc. B Unless specified otherwise, all facings, coatings, PVC covers and other accessories shall have a fire hazard rating not to exceed 25 for Flame Spread and 50 for Fuel Contributed and Smoke Developed; ratings determined by UL Standard No. 723, NFPA Standard No. 225 or ASTM Standard No. E -84. UL label or listing, or satisfactory test results from the approved testing laboratory, shall be available to indicate that fire hazard ratings for materials do not exceed the above amounts. 2.2 ACCEPTABLE MANUFACTURERS A. Product name and numbers listed are Owens- Corning Fiberglas, Armstrong Cork Company, and Childers. B Other acceptable manufacturers are Schuller, Certain -Teed, Knaupf, or approved substitute. MAHLUM NORDFORS MCIONNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.3 PRIMARY HEATING WATER PIPING A. Two-Piece Fiberglas ASJ /SSL -II B Pipe Size Insulation Thickness 1 -inch and below 1 1/2 -inch 1 -1/4 -inch thru 2 -inch 2 -inch 2 -1/2 -inch and above 3 -inch C. Cover. Fiberglas ASJ /SSL -II 2.4 STEAM PIPING LOW PRESSURE A. Two-Piece Fiberglas ASJ /SSL -II B. Pipe Size Insulation Thickness 2 -inch and below 1 -1/2 -inch Above 2 -inch 2 1/2 -inch C. Cover. Fiberglas ASJ /SSL -II 2.5 STEAM CONDENSATE PIPING A. Two-Piece Fiberglas ASJ /SSL -II B Pipe Size Insulation Thickness 4-inch and below 1 -1/2 -inch Above 4 -inch 2 -inch C. Cover Fiberglas ASJ /SSL 2.6 HEATING WATER PIPING A. Two Fiberglas ASJ /SSL -II B Pipe Size Insulation Thickness 4-inch and below 1 1/2 -inch Above 4 -inch 2 -inch C. Cover Fiberglas ASJ /SSL 2.7 CHILLED WATER PIPING A. Two-Piece Fiberglas ASJ /SSL -II B Insulation Thickness: 1 -inch all sizes. C. Cover. Fiberglas ASJ /SSL 2.8 CONDENSER WATER PIPING SECTION 15070 PAGE 2 MECHANICAL SYSTEMS INSULATION t 1 1 i 1 t MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15070 PAGE 3 MECHANICAL SYSTEMS INSULATION A. Two -Piece Fiberglas ASJ /SSL -II B. Insulation Thickness: Two -inch all sizes. C. Cover Fiberglas ASJ /SSL 2.9 REFRIGERATING PIPING A. Armstrong II/Armaflex flexible closed -cell elastomeric unslit tubing. B Pipe Size Insulation Thickness 1 -inch and below 1 -inch Above 1 -inch 1 -1/2 -inch multiple -layer C. Seam joint adhesive Armstrong Adhesive #520. D Insulation coating WB Armstrong Armaflex Finish. 2.10 DOMESTIC HOT, COLD AND HOT CIRCULATING WATER PIPING AND REFRIGERATION CONDENSATE DRAIN PIPING A. Two piece Fiberglas ASJ /SSL -II. B Insulation thickness: 1 -inch all sizes, except 1/2 -inch for cold water and condensate drain pipe. C. Cover Fiberglas ASJ /SSL. D At contractor's option Armstrong 1/2 -inch thick self -seal Armaflex 2000 on piping 1/2 -inch thru 2 -inch pipe size. 2.11 RAINWATER LEADERS (DOWNSPOUT AND OVERFLOW) AND UNDERSIDE OF ROOF DRAINS A. Same as for cold water piping. 2.12 SOIL AND WASTE PIPING (IN UNHEATED SPACES) A. Same as for cold water piping. 2.13 STEAM RELIEF VALVE DISCHARGE PIPING: A. Same as for steam piping. 2.14 PIPE AND DUCT METAL JACKETING A. Childers Strap -On aluminum jacket, 0.016 -inch minimum thickness and 1/2 -inch wide aluminum bands, 0.02 -inch minimum thickness for pipe and ducts. B Childers aluminum jacket, 0.02 -inch minimum thickness for pipe fittings. 2.15 DUCTS (INTERIOR) A. Fiberglas FRK 25 faced duct wrap. B Insulation thickness: 2 -inch. MAHLUM NORDFORS MCIONNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15070 PAGE 4 MECHANICAL SYSTEMS INSULATION C. Thermal conductivity at 75 degrees F mean (ASTM C518) 0.3 BTU /in/h/Ft {2 }/Degrees F with an installed R value of 5.5 2.16 DUCTS (EXTERIOR) A. Rigid glass fiber board, Owens/Coming "Fiberglas 700 Series' B Insulation thickness: 2 -inch. C. Thermal conductivity at 70 °F mean, 6.0 lb/cu. ft. density, minimum installed thermal resistance shall be R =7.0. 2.17 EQUIPMENT, VALVE AND ACCESSORY INSULATION A. Glass Fiber Insulation 1. Insulation a. Curved surfaces 10 -inch diameter and less, use premolded pipe insulation; maximum "K" value at 75 degrees F of 0.27 Btu inches/hr /sqft/degrees F• with factory- applied jacket. b. Flat Surfaces: Owens Coming type 703, CertainTeed "IB300" or Knauf "Elevated Temperature Board" maximum "K" valve at 75 degrees F of 0.23 Btu- inches/hr/sqft/degrees F 2. Jacket a. Primary Jacket: All service jacket; factory applied; laminated type with off -white vinyl coating, integral vapor barrier with 0.02 perm rating and 10 x 6 mesh scrim per inch; or type FRK, foil- reinforced kraft jacket with integral vapor barrier, 0.02 perm rating and 10 x 6 mesh scrim per inch 3. Lagging Adhesive: Borden "Arabol" No. E -1658 or Foster "Lagfas non flammable. B Foamed Uni- Cellular Insulation. 1. Insulation: As made by Armstrong World Industries "Armaflex II" or equivalent of Rubatex or Halstead manufacturer, meeting flame (25) and smoke (50) limitations, as specified herebefore. Submit certification of such compliance. 2. Adhesive: Contact adhesive Armstrong Type 720. C. Prefabricated Insulation Bats. 1. Insulation: 3 -inch thick Owens- Coming Type II glass wool or Knauf "Elevated Temperature Blanket" non oiled. 2. Jacket: Tight weave, woven glass fiber cloth; Alpha Associates Type 1925. 3. Accessories: Jacket sewing thread shall be glass fiber and stainless steel sewing twine. Jacket lacing hooks shall be brass or stainless steel Bergen hooks. Lacing shall be copper wire. 4 Lagging Finish Compound; Benjamin Foster 30-30 lagging adhesive and 30-42 lagging adhesive. 2.19 RIGID INSERTS A. Schuller Thermo -12 pipe insulation, cork, or shaped wood. 2.20 ELECTRIC HEAT TAPE 1 t 1 1 1 1 1 MAHLUM NORDFORS MCIINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS SECTION 15070 PAGE'S MECHANICAL SYSTEMS INSULATION A. Raychem "XL- Trace" self regulating UL listed system complete with heaters, components and controls furnished to operate on line voltages with transformers for the electrical characteristics indicated in the electrical portion of the drawings and/or specifications. Provide with ground fault interrupt protection. B Heater sized according to the following table. The required heater output rating is in watts per foot at 50 degrees F Heater selection based on 1 -inch fiberglass insulation on metal piping. Minimum Ambient Temperatures ire 10 degrees F 20 degrees F. 3 -inch or less 5 watt 5 watt 4-inch 5 watt 8 watt 6-inch 8 watt 8 watt C. Control consisting of a thermostatically controlled sensing bulb #AMC -F5 set at 40 degrees F through an appropriate contractor FART 3 EXECUTION 3.1 PREPARATION A. Install covering after piping, duct work, and equipment have been tested and approved. B Ensure surface is clean and dry prior to installation. Ensure insulation is dry before and during application. C. Ensure insulation is continuous through inside walls except at fire walls. D Deliver material to job site in original non -broken factory packaging, with manufacturer's labels. E. Perform work at ambient and equivalent temperatures as recommended by the manufacturer 3.2 PIPING A. Apply insulation to connections, joints, welds, flanges, or threaded joints after pipe tests are completed. B Apply insulation over flanged joints after piping has been brought up to operating temperature and flange bolts have been fully tightened. C. Insulate flanges, unions, strainers, flexible connections and expansion joints only on chilled water, steam piping over 15 psig, and domestic cold water systems. D Provide rigid inserts where piping supports pass around the outside of insulation with a vapor barrier. Repair damage to vapor bather resulting from installation of the inserts by sealing with a vapor barrier pressure sensitive tape. E. Finish insulation neatly at hangers, supports and other protrusions. F Provide adequate support for insulation on vertical pipe to prevent slipping. G. Insulate thermometer and pressure/temperature test wells over their exterior length. Insulate wells protruding above finish pipe or equipment insulation. Neatly taper insulation away from top of well. H. Insulate pressure gauge lines up to first shutoff valve in gauge lines. I. Cover piping, fittings, valves and accessories in utility tunnels, located outdoors, and where indicated on the drawings with metal jacketing. i MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS SECTION 15070 PAGE 6 MECHANICAL SYSTEMS INSULATION J. Insulate refrigeration liquid piping in the building, and refrigeration suction piping in the building and outside the building. Apply insulation coating on refrigeration piping insulation outside the building not covered with metal jacket. Do not insulate hot gas pipe. K. Do not insulate cold water piping or rainwater leader buried under concrete slab on grade, or direct buried underground pipe outside the building. L. Insulate soil and waste piping where noted on the drawings, where piping is installed in outside walls, and where subject to freezing. M. Seal butt joints of insulation with pressure sensitive vapor barrier tape. Seal exposed ends of insulation with Benjamin- Foster 30 -36, and at 21 -foot intervals on continuous runs of pipe. Use Armstrong #520 adhesive on Armaflex II and Armstrong 2000 products. Apply insulation with all sides and end joints butted tightly N. Valves, fittings and accessories: 1 Except as specified otherwise, insulate with covering same as pipe insulation material or equal in temperature resistance and thickness to that of connecting pipe. 2. Fittings, valves and accessories exposed in rooms cover with Zeston PVC covers, installed in accordance with the manufacturer's directions. 0 Calcium silicate insulation: 1. Wire in place with 16 -gauge black annealed wire, 12- inches on center Stagger joints on multi- layered applications. 2. Field apply jackets in accordance with manufacturer's directions. P Roof Drains: Adhere flexible insulation with adhesive applied to the entire surface of the drain inside the building. Butt insulation and seal joints and breaks with 4-inch wide strips of ASJ sealed with vapor barrier adhesive. Downspout and Downspout Overflow Piping: Insulate all downspout piping. Insulate underside of overflow roof drain body and downspout overflow piping for a distance extending 5 -feet from each drain. If coupling for grooved -end pipe is used on piping, insulate as specified for flanges with PVC fitting cover. R. Chilled Water Piping: Insulate all chilled water piping including coil return bends and headers located outside of duct or plenum enclosures. S. At handicapped lavatories, insulate tailpiece, trap, trap arm, and hot water supply with same insulation as hot water piping, and cover with Zeston jackets. Q. T Electric Heat Tape: 1. Apply the heater linearly on the pipe after piping has been successfully pressure tested. Secure the heater to piping with cable ties or fiberglass tape. Aluminum tape for plastic pipe. Make necessary connections. 2. Apply "electric traced" signs to the outside of the thermal insulation. 3 Tests: a) After installation and before and after installing the thermal insulation, subject heater to testing using a 1000 VDC megohmmeter Minimum insulation resistance should be 20 to 1000 megaohms regardless of length. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS 3.3 DUCTS SECTION 15070 PAGE 7 MECHANICAL SYSTEMS INSULATION A. Insulate return ducts in spaces not heated to at least 65 degrees F and areas outside the insulated building envelope. Insulate all supply ducts and outside air ducts. B. Adhere insulation to metal with 4-inch wide strips of insulation bonding adhesive at 8- inches o.c. Additionally secure insulation to the bottom of rectangular ductwork wider than 24-inches with Miracle surface anchors or metal stick clips 18- inches on center Round duct over 12- inches in diameter spiral wind over insulation 16 -gauge black annealed wire. Wrap insulation firmly on the ductwork with all circumferential joints butted and longitudinal joints overlapped a minimum of 2- inches. Secure overlap and 2 -inch facing flange with 9/16 flare -door staples 6- inches o.c. Tape with 3 -inch -wide foil reinforced Kraft tape. Tape all pin penetrations or punctures in facing. C. Insulate all access panels in ducts with vapor barrier insulation same as duct insulation. Seal edges of insulation on access panel and finish openings to assure accessibility D Lined ducts need not be wrapped. E. Install aluminum jackets on all insulated ductwork above the roof and elsewhere where exposed to weather. All jacket joints to overlap 2 -inch minimum. Provide aluminum straps at all joints and on 18 -inch maximum centers with straps tightened to hold jacket tightly to insulation surfaces. At the Contractors option, install aluminum pop rivets for all transverse and longitudinal jacket joints on 9- inch maximum centers with aluminum straps installed between transverse jacket joints at not more than 18 -inch spacing between straps and joints or between straps. 3.4 EQUIPMENT, VALVE AND ACCESSORY A. Application 1 Glass Fiber Insulation: Insulate the following to the thickness listed: IttM Thickness Converters 2 -1/2 -inch Flash Legs, M.P Steam 2 -inch Condensate Storage Vessel 2 -inch All Other Hot Equipment 3 -inch* 2. Prefabricated Insulation Bats: Insulate the following: a. Pump Casings b. Water Flanges, Unions, Strainers, Valves, Flexible Connections and Expansion Joints B. Glass Fiber Insulation 1 Joints: Tightly butt adjacent insulation sections together, seal all joint surfaces with lagging adhesive. 2. Securing of Insulation to Flat Surfaces: Install weld pins; 12 -inch centers maximum; not less than 3 -inch from edge or corner of insulation bat. 3. Primary Jacket: White or foil surfaces outermost; lap joints 2 -inch; seal with field applied lagging adhesive and also staples on 4-inch centers. 4 Secondary Jacket: Apply over the primary jacket; install glass fiber (or canvas) fabric; joints lapped 1 1/2 -inch minimum; use dip and finish coat of lagging adhesive. 5 Insulation of Equipment Flanges: Install insulation and jacket of the same type as specified for glass fiber piping insulation. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 6. Stampings of Labels on Pressure Vessels: Do not insulate; terminate insulation, with neatly finished jacket edges adjacent to each stamping and label. C. Foamed Uni- Cellular Insulation 1. Fill depression and cavities in equipment surfaces with insulating cement to provide smooth base for insulation. Finish curved surface to conform with curve of surface being covered. Finish other surfaces true and smooth. Protect insulation at openings and corners with adhesive. Leave 'access doors, moving parts and code stamps uncovered. Install insulation around openings to assure accessibility 2. Apply insulation around removable heads to permit removal of heads without disturbing shell insulation. Cover shell flanges and head flanges with insulation of thickness specified. Apply insulation on head flanges for removal and replacement in sections without undue difficulty and breakage. 3 Coat insulation and surface to be insulated with 100 percent covering using adhesive. When adhesive becomes tacky to the touch, press insulation into place, making sure edges butt tightly 'Seal butt edges with 4-inch wide strips of insulation applied in the same manner. 4 Equipment outside the building apply Armstrong Armaflex Finish. D Prefabricated Insulation Bats 1. Materials: Cover all surfaces with bats of glass fiber within glass cloth jackets and with outer vapor barrier finish, made and shaped to fit irregular contour surfaces of the valves. Thickness shall be same as on adjacent piping. 2. Construction of Bats: Construct bats with glass wool, fully enclose all sides and edges, within woven glass fiber cloth. Jacket shall be sewn with glass fiber and stainless steel sewing twine, and rolled in blind seams, with bats compressed to 1 1/2 -inch thickness. Attach stainless steel Bergen hooks on 3 -inch centers around all edges of bats on top surfaces. 3. Construction of Bats for High Pressure Steam Piping Service: Same construction as bats in general, except with knitted stainless steel wire mesh sewn on inside surface of bat in place of glass fiber cloth. 4 Attachment: Fit the bats to the surface, with edges overlapping adjacent insulation at least 3- inch, and lace between hooks with stainless steel wire lacing. 5 Lagging Compound Coating for Bats Used on Chilled Water Service: Over exterior of all surfaces apply one coat of Benjamin Foster 30-30 lagging adhesive, and two finish coats of 30- 42 lagging adhesive to produce a smooth exterior vapor barrier coating. END OF SECTION 15070 SECTION 15070 PAGE 8 MECHANICAL SYSTEMS INSULATION r MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PAILT I GE C 1.1 WORK INCLUDED A. Pipe hangers and supports. B. Expansion devices. C. Equipment bases and supports. D Seismic protection of piping and equipment. 1.2 CODES AND STANDARDS SECTION 15090 PAGE 1 PIPING AND MECHANICAL EQUIPMENT SUPPORT A. SMACNA publication "Guidelines for Seismic Restraints of Mechanical Systems and Plumbing Piping Systems" for seismic protection of piping. B. The Uniform Building Code for seismic protection of equipment. 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. PART 2 PRODUCT 2.1 ACCEPTABLE MANUFACTURERS A. Pipe hangers and supports: 1. ITT- Grinnell, Elcen, Grabler, Kindorf, Fee Mason, Unistrut, Superstrut or approved substitute. B Expansion Devices, Guides and Anchors: 1. Adsco, Advance Thermal Systems, ITT- Grinnell, Keflex, Elcen, Aeroquip Barco, or approved substitute. 2.2 STRUCTURAL ATTACHMENTS A. Steel Structural Clamps: 1. Beam clamps, brackets, channel clamps and bar joist clips select to suit structural system and meet loading recommendations of manufacturer. B Cast -in -Place Ceiling Inserts: 1. 3 -inch and smaller pipe, Grinnell Fig. 285 2. 3 -1/2 -inch and larger pipe, Grinnell Fig. 281 3 Multiple pipes on trapeze, Grinnell Fig. 285 or Fig. 281, selected for maximum weight of piping. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS C. Attachment into existing concrete or masonry wall: Self -drill type Red Head, Phillips Anchors or approved substitute. Do not use powder driven inserts. 2.3 INTERMEDIATE ATTACHMENTS A. Hanger Rods: 1. Continuous threaded rod, do not use chain, wire or perforated strap. 2. Maximum hanger rod loading as follows: Rod Size, Maximum Load, Diameter in Inches Pounds 3/8 610 1/2 1130 5/8 1810 3/4 2710 7/8 3770 1 4960 SECTION 15090 PAGE 2 PIPING AND MECHANICAL EQUIPMENT SUPPORT B. Trapeze Pipe Racks: Fabricate from structural angles or channels or Unistrut channels to suit weight of piping to be supported. Size for a minimum safety factor of 5 C. Hanger Straps: Galvanized bar steel, 3/4 -inch wide by 18 gauge for 2 -1/2 -inch and smaller pipe; 7/8- inch wide by 16 gauge for 3 -inch to 4-inch pipe; 1 1/8 -inch wide by 12 gauge for 6 -inch pipe size. 2.4 PIPE ATTACHMENTS A. Pipe Rings: 1. Steel pipe and cast iron soil pipe: 2 -inch and smaller, adjustable ring Grinnell #269 2 1/2 -inch and larger, adjustable clevis Grinnell #260. 2. Copper Pipe: 2 -inch and smaller, adjustable ring Grinnell #CT 269 2 1/2 -inch and larger, adjustable clevis Grinnell #CT -65 3 Finish: Black for black steel pipe and cast iron pipe; galvanized for galvanized steel pipe; copper plated for copper pipe. 4 Application: Use only on piping systems where axial movement from thermal expansion is less than 1/2 -inch. 5 For Hanger Straps: Elcen Figure 94 or Grinnell Figure 97 with flattened -end bolt through cast iron socket; or hinged type, Modem Hanger Corporation No. 20, Elcen Figure 104, or Grinnell Figure 108. Pipe rings shall be electro-galvanized, prime painted or cadmium- plated. B Pipe Rolls: 1 Suspended pipe: Adjustable clevis pipe rolls, Grinnell Fig. 181. 2. Racked pipe: Pipe roll stand, Grinnell Fig. 271. 3 Application: Use on piping systems where axial movement from thermal expansion is 1/2 -inch or greater. C. Pipe Anchors: 1. Structural steel with welded joints and connections, unless shown otherwise on drawings. 2. Design anchor members and welds to constrain axial and rotational stresses in the piping, at the MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS test temperatures and test pressures specified. D. Pipe Guides: 1. Select guides to accommodate insulation thickness specified, with a minimum of 1/8 -inch clearance between the outside of the insulation and the inside of the guiding cylinder. 2. Pipe guides for steel pipe Adsco Model "FRE with 7 -inch guide traverse, unless indicated otherwise on the drawings. 3. Pipe guides for copper pipe Adsco Model "FRE with copper shields and with 6-inch guide traverse, unless indicated otherwise on the drawings. 4 Insulating thermal barrier at pipe guides used on chilled water piping, Adsco "TTB' Insulate screw heads to avoid condensation. E. Vertical Pipe Supports: 1. Steel and iron pipe: Grinnell #261 galvanized. 2. Plastic pipe: Grinnell #261C. SECTION 15090 PAGE 3 PIPING AND MECHANICAL EQUIPMENT SUPPORT F Pipe Slides: 1 Elcen or Grinnel manufacturer, reinforced teflon slide material (3/32 -inch minimum thickness) bonded to steel; highly finished steel or stainless steel contact surfaces to resist corrosion; 60 80 psi minimum thickness; attachment to pipe and framing by welding. 2.5 EXPANSION DEVICES A. Expansion Joints (packed type): 1. Slip -type internally guided, with outward limit stop, 150# steel, flanged ends with base, Adsco type "IS." 2. Self lubricating teflon, packing, suitable for permanent service. Lubrication fittings not required. 3. Size, traverse and location as shown on the drawings. Select for 80 percent compression, 20 percent elongation. 4 Drip connections are not required. B. Expansion Joints (packless bellows type): 1. 2 -1/2 -inch pipe size and below* 321 stainless steel, 300 psig, 600 degrees F, 80 percent compression, 20 percent extension, 2 -inch or 4-inch traverse as indicated on the drawings, Keflex Series 7Q. 2. 3 -inch pipe size and above: Corrugated, Type 304 stainless steel bellows, telescoping Type 304 stainless steel liner, cast semi -steel equalizing rings, 150# steel, flanged end, single joints with base, Adsco Corruflex. Size, traverse and location as shown on the drawings. Select for 80 percent compression, 20 percent elongation. 3. Rubber expansion joints: Steel ring reinforced seamless rubber Spanflex Style *SF* *SFR* *SFRT* 230 degrees F, 140 psig, Keflex, Metraflex, Mercer, or approved substitute. C. Ball Joint Fittings: 1. 2 -inch and mailer pipe: Barco "standard series threaded end, No. 11 gaskets, style as shown on the drawings. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2. 2 -1/2 -inch and larger pipe: Barco Type N, weld end, No. 11 N gaskets, style as shown on the drawings. 2.06 EQUIPMENT BASES AND SUPPORTS A. Concrete pads shall be 3 -1/2' high. Pads shall extend 6- inches beyond machine base in all directions with 3/4 -inch top edge chamfered. Submit shop drawings of pads to the Architect for approval. B Structural steel frame supports shall have all joints welded. Galvanize after fabrication. gtT 3 EXECUTION 3.1 HANGER SPACING FOR PIPING SECTION 15090 PAGE 4 PIPING AND MECHANICAL EQUIPMENT SUPPORT A. Horizontal Steel Pipe: Maximum hanger spacing and minimum hanger rod diameters as follows: 1/2 and 3/4 -inch pipe 5 -foot span 3/8 -inch rod 1 and 1 -1/4 -inch pipe 7 -foot span 3/8 -inch rod 1 -1/2 -inch pipe 9 -foot span 3/8 -inch rod 2 -inch pipe 10 -foot span 3/8 -inch rod 2 -1/2 and 3 -inch pipe 12 -foot span 1/2 -inch rod 4 -inch pipe 14 -foot span 5/8 -inch rod B Horizontal Copper Pipe: Maximum hanger spacing and minimum hanger rod diameters as follows: 1/2 -inch pipe 5 -foot span 3/8 -inch rod 1 -inch pipe 6 -foot span 3/8 -inch rod 1 1/4 and 1 1/2 -inch 6 -foot span 3/8 -inch rod 2 and 2 1/2 -inch pipe 9 -foot span 1/2 -inch rod 3 and 4 -inch pipe 10 -foot span 1/2 -inch rod C. Horizontal Cast Iron Soil Pipe: 1. One hanger for each pipe section, close to hub, maximum hanger spacing of 5 -feet, except for pipe exceeding 5 feet in length may be supported at not more than 10 -foot intervals within 18- inches of joint. 2. Hubless and compression joints at every other joint except when developed length exceeds 4- feet, then at each joint. Provide supports at each horizontal branch. D Provide additional hangers or supports at concentrated loads such as valves, to maintain alignment and prevent sagging. E. Vertical Piping Supports: 1. Support piping at each floor. 2. Provide intermediate supports to prevent excessive pipe movement. F Provide a minimum of 2 hangers per pipe section for grooved joint pipe. G. Piping crossing over excavated and backfilled areas, provide precast concrete beam supported by the building structure and undisturbed earth. 1 .1 1 1 1 1 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 INSTALLATION OF PIPE HANGERS AND SUPPORTS SECTION 15090 PAGE 5 PIPING AND MECHANICAL EQUIPMENT SUPPORT A. Provide piping supports and hangers with a means of adjustment for leveling, grading of piping and cold spring movements. B. Provide sufficient hanger rod lengths to limit rod displacement from thermal expansion to 4 degrees from vertical. C. Size pipe rings and clamps to pass around the outside of the piping insulation. Provide Grinnell Fig. 160 pipe covering protection saddles at pipe rings where pipe insulation does not include a vapor barrier. Provide Grinnell Fig. 167 insulation protection shields at pipe rings where pipe insulation includes a vapor barrier. Provide rigid inserts as required to prevent crushing of insulation. D Install vertical piping supports to allow for pipe movement due to thermal expansion and contraction. E. Do not hang pipe from other pipe. F Provide special hangers and supports for vibration control in critical areas. See Vibration Isolation, Section 15060. G. Install steel backing in walls as required to support piping hung from steel stud walls. H. Embed concrete inserts in new cast -in -place concrete. With concrete joist framing, place inserts at bottom of joists wherever possible. If closely spaced steel prevents such placement, provide Parker Kalon Type U -Drive screws and attach to sheetmetal pan forms. I. Provide bored, drilled or reamed holes for all bolting to miscellaneous structural metals, frames or for mounts or supports. Flame cut, punched or hand sawn holes will not be accepted. J. Install anchor bolts for all mechanical equipment and piping as required. Tightly fit and clamp base supported equipment anchor bolts at all equipment support points. Provide locknuts where equipment is hung. 3.3 INSTALLATION OF EXPANSION DEVICES A. Expansion Loops: 1. Provide expansion loops where shown on the drawings, sizes as dimensioned. 2. Provide pipe anchors spaced as shown on either side of the expansion loop. 3 Provide loops with cold spring of 50 percent of the calculated thermal expansion. B Expansion Joints (packed type): 1. Protect slip surfaces before, during and after installation, by use of lubricants and soft cloth covers. Should any of the slip surfaces be damaged, remove and replace with new slip. 2. Install according to the manufacturer's recommendations. 3 After each joint has been in service, inspect each joint and adjust each gland, per manufacturer's installation instructions. Draw up glands uniformly, to prevent binding and damaging the slip. Add packing where necessary C. Expansion Joints (packless bellows type and ball type): 1. Install according to the manufacturer's recommendations. 2. Install ball joints with cold set equal to one -half the calculated thermal expansion. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS END OF SECTION 15090 SECTION 15090 PAGE 6 PIPING AND MECHANICAL EQUIPMENT SUPPORT 3.4 EQUIPMENT BASES AND SUPPORTS A. Provide supports, pads, bases and their attachments for mechanical work to be furnished or installed. Submit drawings to the Architect for approval. B. Provide concrete pads for pumps, compressors, other rotating mechanical machinery, boilers, and for equipment where indicated on the drawings. Insert #4 6 -inch -long steel dowel rods into floors to anchor pads. C. Provide structural steel frame supports for equipment where indicated on drawings. Bolt to structure. 3.5 SEISMIC PROTECTION OF PIPING AND EQUIPMENT A. Seismic Restraints: 1. Provide seismic protection for all piping in accordance with the most current edition of the SMACNA publication "Guidelines for Seismic Restraints of Mechanical Systems and Plumbing Piping Systems' 2. Provide seismic protection for all equipment in accordance with the Uniform Building Code, most recently adopted by the authority having jurisdiction. 3 Overturning force calculations for equipment shall be prepared and submitted and shall be used to determine anchor bolt size and locations. 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON SECTION 15100 PAGE 1 OLYMPIC MEMORIAL HOSPITAL VALVES 2MAINISURGERY ADDITIONS ALTERATIONS PART 1 GEISEUL 1.1 WORK INCLUDED A. Valves B. Plug, Gauge and Balancing Cocks 1.2 CODES AND STANDARDS A. See Section 01091, Reference Standards. 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B. All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. PART2 PRODUCT 2.1 ACCEPTABLE MANUFACTURERS A. Provide valves of same manufacturer throughout where possible. B Provide valves with manufacturer's name and pressure rating clearly marked on outside of body C. Specifications are based on the valve manufacturer Milwaukee. Other acceptable manufacturers include Crane, Bell Gossett, Walworth, Kennedy Stockham, Hammond, Nibco, Keystone, Sarco, Norris, Mueller, Grinnell ITT and Victaulic. 2.2 GENERAL A. Provide valves suitable to connect to adjoining piping as specified for pipe joints. Use pipe size valves, unless indicated otherwise. B Thread pipe sizes 2- inches and smaller C. Flange pipe sizes 2 1/2- inches and larger. D Solder or thread- to-solder adapters for copper tubing. E. Use grooved body valves with mechanical grooved jointed piping. 2.3 GATE VALVES A. 2 -Inch and Smaller. Bronze, wedge disc, threaded bonnet, threaded ends, non -rising stem, 125 psi, S.W.P., Crane 438, or approved equal. B. 2 1/2 Inch to 4 Inch: Iron body, bronze trimmed, wedge disc, bolted bonnet, threaded ends, non -rising stem, 125 psi, S.W.P., Crane 460, or approved equal. MAHLUM NORDFORS MCKINLEY GORDON SECTION 15100 PAGE 2 OLYMPIC MEMORIAL HOSPITAL VALVES 2MAIN/SURGERY ADDITIONS ALTERATIONS C. 4-Inch and Larger. Iron body, bronze trimmed, wedge disc, bolted bonnet, flanged ends, non rising stem, 125 psi, S.W.P., Crane 461, or approved equal. 2.4 GLOBE VALVES A. 3 Inch and Smaller for all Services: Bronze, composition disc, for 300 degrees F, union bonnet, threaded ends, 150 psi, S.W.P., Crane 7TF or approved equal. B. Larger than 3 inch for up to 125 Psig Steam: Crane #353, or approved equal. C. Larger than 3 -inch for up to 250 Psig Steam: Crane #21E, or approved equal. 2.5 CHECK VALVES A. Horizontal 2 -Inch and Smaller: Bronze body and disc, lift check, union bonnet, threaded ends, 150 psi, S.W.P., Milwaukee 544, or approved equal. B Vertical 2 -Inch and Smaller: Bronze body and bronze guided disc, lift check, threaded ends, 125 psi, S.W.P., Milwaukee 548, or approved equal. C. Vertical 2 -1/2 -Inch and Larger: Semi -steel body, bronze trim, guided spring, silent lift check, center guided 125 psi, S.W.P Milwaukee 1800 series, or approved equal. D Horizontal 2 -Inch and Larger. Semi -steel body, bronze trimmed, guided spring, silent check, wafer type, flanged ends, 125 psi, S.W.P Milwaukee 1400 series. E. Fire Protection: Iron body, bronze mounted, swing check, flanged ends, 175 psi non -shock water, UL approved, Stockham 0940, or approved equal 2.6 BUTTERFLY VALVES A. 2 -Inch to 6 -Inch: Lug wafer factory- tested, bubble -tight to 150 psig, tapped -lug, ductile or gray iron body top bushing, extended neck, and EPT sleeve for 250 degrees F Other wetted parts shall be Type 316 stainless steel or aluminum- bronze. Valve suitable for operation with up to 2- inches of pipe insulation, 10- position lever operating handle, with tooth plate for shutoff service and infinitely adjustable handle with lock nut and memory stop. Crane 44BXZTL, or approved equal. B 8 -Inch and Larger Same as above except with enclosed weatherproof worm gear or screw operator, adjustable stops, position indicator and handwheel, in place of 10- position lever operator Crane 44BXZG, or approved equal. 2.7 BALL VALVES A. 2 -Inch and Smaller: Bronze body, brass ball, teflon seats, threaded ends, 600 psi CWP Crane 9302, or approved equal. B 3 -Inch and Larger. Use butterfly valve. 2.8 GAUGE COCKS A. Brass, 1/4 inch, 1000 psi, S.P W all brass. Trerice No. 865, or approved equal. 2.9 BALANCING VALVES A. Valve shall be same size as connected piping, with memory stop and connection taps. Furnish setting instructions and curves. Bell Gossett "Circuit Setter Taco "Circuit Setter" or equivalent. 1 i 1 1 i 1 MAHLUM NORDFORS MCKINLEY GORDON SECTION 15100 PAGE 3 OLYMPIC MEMORIAL HOSPITAL VALVES 2MAINISURGERY ADDITIONS &.ALTERATIONS B. When manufacturer's largest catalogued metering balancing valve is smaller than the size required, provide a venturi type flow tube and butterfly valve as specified herein. Install flow tube with minimum inlet and outlet conditions as recommended by manufacturer, Barco or Gerand. 2.10 BALANCING COCKS A. Brass body 300 psi W.O.G. 250 degrees F., indicating dial, locking balancing device, with wheel handle. Threaded ends for steel piping, sweat union for copper piping, Bell Gosset CB, or approved equal. B Where manufacturer's largest catalogued valve is smaller than the required size, provide butterfly valve. 2.11 DRAIN VALVES A. Globe valves, angle pat tern, bronze body composition disc, threaded bonnet, rising stem, 200 psi W.O.G., 3 /4inch, unless otherwise indicated on the drawings. Where not shown piped to drain, provide capped hose adapter. 2.12 REFRIGERANT LINE VALVES A. Provide diaphragm packless -type for sizes 718 -inch and smaller, Superior, Henry Kerotest, Meller, or approved equal. B For larger sizes, at Contractor's option, provide either diaphragm packless type or valve with Metrex o- ring, teflon seat and seal cap. 2.13 VALVE OPERATORS A. Provide suitable handwheels for valves. B Provide one (1) plug cock wrench for every ten (10) plug cocks sized 2- inches and smaller, minimum of one wrench. Provide wrench with set screw for each plug cock sized 2 l/2- inches and larger FART 3 EXECUTION 3.1 GENERAL A. Install all valves with stems upright or horizontal, not inverted. 3.2 SERVICE A. Isolation and shut -off for steam systems 1. Use gate valves for all sizes. B Isolation and shut -off for natural gas systems 1. Use plug cocks for all sizes. C. Isolation and shut -off for refrigerant systems 1. Use diaphragm -type valve. D Isolation and shut -off for all other systems 1. 2 -Inch and Smaller Use ball valve. MAHLUM NORDFORS MCKINLEY GORDON SECTION 15100 PAGE 4 OLYMPIC MEMORIAL HOSPITAL VALVES 2MAIN/SURGERY ADDITIONS ALTERATIONS 2. 2 -1/2 -Inch to 4-Inch: Use gate valve. 3. 4-Inch and Larger. Use butterfly valve. E. Throttling 1. For all Sizes Steam Use globe valve 1. 3 -Inch and Smaller for all Other Services: Use globe valve. 2. 4-Inch and Larger for all Other Services: Use butterfly valve. F Flow direction 1. Use lift check valve for all sizes, valve to be rated for orientation of installation (horizontal/vertical). G. Metering and Balancing 1. For sizes through manufacturer's largest cataloged size: Use metering/balancing valve. 2. For sizes greater than manufacturer's largest cataloged size: Use butterfly valve with venturi flow tube. H. System drains 1. Use 3 /4-inch drain valve for all piping sizes, unless indicated otherwise on the drawings. Provide capped hose adapter where not indicated piped to drain. 33 REFRIGERANT VALVES A. Provide valve where shown on the drawings and where required by codes and ordinances. Install in accordance with manufacturer's instructions to avoid damage to valves. 3.4 ACCESS A. Install valves in accessible location to allow for maintenance and removal. B. Provide chain guides and chains for valves 4-inch and larger with horizontal centerline of the valve more than 7 -feet above the floor Mount valve horizontally with chain long enough to terminate 4-feet above the floor Chain operators shall be same manufacturer as the valve. END OF SECTION 15100 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS P GAL 1.1 WORK INCLUDED SECTION 15420 PAGE 1 SOIL, WASTE AND VENT SYSTEMS A. Soil, waste and vent piping and downspout, overflow piping systems, and connection to fixtures and equipment within 5 -feet outside the building wall. 1.2 CODES AND STANDARDS A. Comply with the version of the Uniform Plumbing Code of the IAPM most recently adopted and as amended by the Authority Having Jurisdiction. 13 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. I i RT 2 PRODUCT 2.1 VENTS A. Vent piping shall be same material as soil and waste piping. B. Flash and counterflash vents under 3 -inch with 4 -pound sheet lead or use adjustable roof flashing of galvanized steel with lead caulking ring Flash 3 -inch vents and larger vents with "Stoneman #1100 -7 flashing assembly with vandal proof cast iron counterflashing sleeve. PART 3 EXECUTION 3.1 INSTALLATION A. PIPING 1. Install all horizontal sanitary drainage, downspout and vent piping with a minimum slope of 1/4 -inch per foot of length. 2. Install piping in suspended ceiling areas, to be above the finished ceiling height called for on the Architectural drawings. Exposed piping areas, maintain maximum headroom. 3. Check elevation of drains during placing of concrete so that adjacent surfaces will drain effectively adjust height if necessary 4 Make flashing permanently watertight. 5 Provide cleanouts the same size as pipe, except that cleanouts larger than 4 -inch not required. 6. Provide test tee at the foot of all soil and waste risers and on each building drain outside of building. 7 Provide cleanouts in soil and waste pipes with floor or wall plates as required, flush with finished wall or floor Provide cleanouts in accordance with Uniform Plumbing Code "Drainage System" chapter, in vertical waste pipe at each sink immediately below trap arm and where shown on the drawings. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 TESTING SECTION 15420 PAGE 2 SOIL, WASTE AND VENT SYSTEMS 8. Excavate pipe trenches to a true and smooth bottom grade and straight alignment. Provide ample width in the trench for proper laying of pipe, and ready makeup and inspection of the joints. Provide minimum trench width 12- inches greater than outside diameter of pipe. Dewater trench before and during installation. Install pipe on a 4-inch thick bed of pea gravel. Provide depressions in trench at fittings. 9 Provide vent for each trap, unless noted otherwise. 10. Terminate vents above the roof at least 10- feet- 0-inch from any opening to the building. A. Plug all openings and fill the entire system with water to highest vent stack above roof. If the system is tested in sections, no section shall be tested with less than a 10 -feet head of water. Hold test for 4- hours. B Repair joints and replace defective fittings or pipe, and retest. C. Final test may be required by either the Plumbing Inspector or Engineer using 2- ounces of oil of peppermint introduced into each line or stack, or as required by ordinances. D Records: The Contractor shall keep a record of each test, initialed by test witnesses, in a log book which is available on site for inspection; copies delivered to the Architect at job completion. END OF SECTION 15420 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART .t GENERAL 1.1 WORK INCLUDED A. Plumbing fixtures B. Trim C. Owner Furnished Equipment 1.2 CODES AND STANDARDS SECTION 15440 PAGE 1 PLUMBING FIXTURES AND TRIM A. Comply with the version of the Uniform Plumbing Code of the IAPM most recently adopted and as amended by the Authority Having Jurisdiction. B. Meet or exceed the following ANSI Standards: Fittings A112.18.IM -79 Supports A112.6.IM -79 Vitreous China FixturesA112.19.2M -82 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. 1.4 QUALITY ASSURANCE A. Plumbing Fixtures: Plumbing fixtures, including trim and fittings, shall be installed in accordance with the details and notes indicated and the recommendations and printed instructions of the manufacturer for each item. Electrical connections to equipment and controls shall be in accordance with the requirements of Division 16. B. Manufacturer Fixtures shall be Kohler Company manufacturer as specified, or approved American Standard or Eljer. Stainless steel fixtures in countertops shall be Elkay manufacturer as specified, or approved Just manufacturer C. Faucets: Faucets shall be same manufacturer as the fixture on which they are mounted, unless specified otherwise. Where faucets are specified to be Chicago Faucet manufacturer, do not substitute. D Flush Valve Manufacturer. Flush valves shall be Sloan Valve Company, manufacturer as specified, or approved Delany or Zurn. E. Protection: All materials shall be covered and stored to prevent damage or weathering prior to installation. F Quality of Materials: All materials installed shall be new, full weight, of the best quality with the same brand or manufacturer used for all similar material or equipment. Color of all fixtures shall be white, unless otherwise specified. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDPITONS ALTERATIONS 1. Enamelware: Acid resisting throughout the work, marked at factory 1.5 WATER CONSERVATION PERFORMANCE STANDARDS SECTION 15440 PAGE 2 PLUMBING FIXTURES AND TRIM A. General: Plumbing fixtures and fittings shall comply with the requirements of Title 19, Chapter 19.27 170. B. Labeling: 1. New fixtures shall be labeled with either a permanent marking or removable label which states the standard the fixture meets and/or information on the maximum amount of water consumed by the fixture. Water information shall also be indicated on the packaging. 2. Vitreous china futures (toilets and urinals) shall be labeled as meeting either ANSI/ASME A112.19.2M -1990 and A112.19.6 -1990 or CSA B45. In case of tank type toilets, marking may be inside of the tank. 3 All other fixtures and fittings shall be labeled as meeting either ANSI/ASME A112.18.1M -1989 or CSA B125 C. Water Use Standards for Futures: 1. Water Closets: Maximum allowable water use in gallons per flush (gpf) for water closets shall be as follows: Tank -type closets 1.6 gpf Flushometer -valve closets 1.6 gpf Flushometer -tank closets 1.6 gpf Electromechanical hydraulic closets 1.6 gpf 2. Urinals: Maximum allowable water use for any urinal shall be 1.0 gallons per flush. 3 Water closets or urinals that operate on a continuous flow or continuous basis are not allowed. D Water Use Standards for Fitting: 1 Shower Heads: Maximum allowable water use shall be 2.5 gpm. 2. Faucets: Maximum allowable water use for all faucets and replacement aerators shall be 2.5 gpm. 3. Lavatory faucets in toilets of public facilities, except where designed and installed for use by the physically handicapped, shall be equipped with a self closing type metering valve designed to close by water pressure. FART 2 PRODUCTS 2.1 LAVATORIES A. Lavatory (P1 -1): Countertop, oval stainless steel, 18 gauge, 19 5/8' x 16 11/16' self rimming, front overflow Elkay No. LLVR 1916, with 4" faucet centers, 1 1/4" x 1 1/2" cast brass P -trap, and 1/2" lavatory supplies with loose key stops. Supply fitting, Chicago No. 895- 317 FC with rigid gooseneck spout, No. 317 4" blade handles, and grid strainer B Lavatory (P1 -2): Wall hung, vitreous china 20" x 18 concealed arms, Kohler "Greenwich" No. K -2032, 1 1/4" offset drain with strainer, 1 -1/4" x 1 -1/2" cast brass P -trap, 1/2" supplies with loose key with loose key stops. Supply fitting, Chicago No. 895 -317 FC with rigid gooseneck spout, No. 317 4 blade handles, and grid strainer MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15440 PAGE 3 PLUMBING FIXTURES AND TRIM C. Lavatory (P1 3): Wall hung, vitreous china, 20" x 18 concealed arms, integral back with single center faucet hole, Kohler "Greenwich" No. K -2031, American Standard "Lucerne" No. 0356.421, Eljer "Delwyn" No. 051 1541, with chromeplated supply from valve to spout with loose key volume regulator, 1 1/4" x 1 1/2" cast brass adjustable P -trap outlet tapped for I.P., chromeplated nipple, and cast brass flange 1 1/2" LP size. Chicago No. 834-EP -SLO wall mounted self closing foot control mixing valve, No. 626 -FC high gooseneck spout with removable threaded plain tip, No. 327 drain with perforated strainer and 1 -1/2" tailpiece. 2.2 WATERCLOSETS A. Closet (P2 -1): Wall hung, vitreous china, siphon jet, elongated bowl, top spud, Kohler "Kingston Lite" No. K -4430, American Standard "Afwall" No. 2257.103, or approved Eljer, 1.6 -gallon flush, water guard toilet. Flush valve and bedpan cleanser, Sloan BPW 5 -1000 "Slimline" diverter valve with deoseptic injector for antiseptic rinsing of hospital bedpans. Closet shall be equipped with steel bolts and chromiumplated brass washers and cap nuts. White seat, open front, less cover with internal stops, Kohler K- 4670 -SC, Olsonite No. 95 -SS, or Bemis 9400KC. B. Closet (P2 2): Same as P2 -1 above, complete except mounted for handicap use. C. Closet (P2 3): Floor mounted, vitreous china, siphon jet, elongated bowl with top spud, Kohler "Highcliff Lite" No. K -4368, or approved American Standard or Eljer, 1.5 -gallon flush toilet. Toilet shall be equipped with Sloan Royal No. 114 flush valve, steel bolts and bolt caps. Seat, white, open front without cover, with self sustaining check hinge, Kohler K- 4670 -C. D Closet (P2 -4): Wall hung, vitreous china, siphon jet, elongated bowl with top spud, Kohler "Kingston Lite No. K -4430, American Standard "Afwall" No. 2257 103, or approved Eljer, 1.6 -gallon flush toilet. Sloan No. 111 flush valve. Toilet equipped with steel bolts and chromiumplated brass washers and cap nuts. Seat, white, open front without cover, with self sustaining check hinge, Beneke No. 523 -SS, Olsonite No. IOCC/SS, Sperzel No. 150- ESS -CH, or Bemis No. 1655 -SS /C. E. Closet (P2 5): Same as P2-4 above, complete except mounted for handicap use. 2.3 SERVICE SINKS A. Service Sink (P4 -1): Floor mounted, corner model, 28" x 28" enameled cast iron service sink, Kohler "Whitby" No. K -6710, American Standard "Florwell" No. 7740.020, or Eljer "Custodial" No. 242 -0050 with removable vinyl coated wire rim guard and flat metal strainer tapped for 3" IPS. Chicago No. 956-R -853, supply fitting with vacuum breaker, loose key stops, rubber hose and with wall hook. 2.4 UTILITY SINKS A. Utility Sink (P4 -2): Wall hung, vitreous china, 25" x 21" blowout action flushing rim, top spud, Kohler "Camerton" No. K 12867 American Standard "Clinic Service Sink" No. 9512.013, or Eljer "Judson" No. 241 -0260, 11" stainless steel rim guard (front only), chromiumplated cast brass loose strainer Sloan No. 117 -YV flush valve; chair carrier Chicago No. 815 wall mounted faucet with 6" elbow action handles, wall brace, loose key stops and color index buttons. Bedpan washer, Chicago No.834-EP -SLO wall mounted double pedals with 778 -SVB wall spout with vacuum breaker, 4 fee white vinyl hose and 777 19K outlet. 2.5 SCRUB SINK A. Surgeon's Scrub -Up Sink (P4 -3): Wall hung, vitreous china, 28" x 22 Kohler "Hollister" No. K- 12793, American Standard "Scrub Sink" No. 9047.093, or Eljer "Andover" No. 231 -0141, single faucet hole, white enameled cast iron brackets with bar support for knee action valve. Provide MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15440 PAGE 4 PLUMBING FIXTURES AND TRIM tempered supply to spout with loose key volume regulator, drain with perforated strainer, 1 -1/2" tailpiece, and 1 1/2" x 1 1/2" cast brass P -trap. Chicago No. 745 -VOC supply fitting with knee control mixing valve and No. 626-E3 gooseneck spout with 2" spray B Fittings for Surgeon s Scurb -Up Sink (P4 -4): Provide tempered supply to spout with loose key volume regulator, drain with perforated strainer, 1 -1/2" tailpiece, and 1 -1/2" x 1 -1t2" cast brass P -trap. Chicago No. 745 -VOC supply fitting with knee control mixing valve and No. 626-E3 gooseneck spout with 2" spray. C. Plaster Sink (P4 -5): Wall hung, vitreous china, 30" x 20" Kohler "Gilford" No. K- 12785, American Standard "Plaster Work Sink" No. 9061.193, or Eljer "Andover" No. 231 -0204, faucet holes on 8" centers, with white enameled cast iron brackets, drain with perforated strainer and 2" O.D tailpiece, Smith No. 8715 plaster interceptor trap, and 2" O.D drain connection from sink to trap and from trap to wall. Chicago No. 631-R 319 faucet with 6" elbow action handles and color index buttons, gooseneck spout and loose key stops. 1. Plaster trap: Floor type J.R. Smith 8715 2.6 TUBS A. Island Tub (P5 -1): Not Used. 2.7 SHOWERS A. Showers (P5 -2): 1. Shower Enclosure: Enclosure and grab bars by General Contractor. 2. Shower Valve: Built -in flush mounted type for concealed piping, pressure balancing type valve, lever handle, integral stops, adjustable safety limit stop, Chicago Faucet No. 1762 -IS. 3. Hand Shower Chicago Faucet No. 150W V with 59" long flexible reinforced white vinyl hose, hand spray No. 778 -17K wall mounting bracket, No. 778 -9K wall spout with vacuum breaker 4 Showers manufactured by Leonard or Speakman conforming to above assembly are acceptable. B Showers (P5 -2): Same as P25 -2 above, complete except mounted for handicap use. 2.8 SINKS STAINLESS STEEL, COUNTERTOP A. General: Unless otherwise specified, all sinks shall be 18- gauge, Type 302 (18 -8) nickel bearing stainless steel, all exposed surfaces to Elkay LK-6K satin or equivalent finish. Sinks shall be self rimming type, ledge back, with underside coated with sound and condensation protective coating at factory Sinks shall have faucet holes to match specified faucet; each sink bowl shall have 3 -1/2" drain opening in center of bowl. Each sink shall be furnished with manufacturer's mounting fastener for installation in a conventional top surface. Drains generally shall be Elkay LK -99 drain outlet for 3 -1/2" openings, 4-1/2" top diameter, heavy -gauge stainless steel body stainless strainer basket with movable lift -up knob with neoprene stopper, 17 -gauge minimum chromiumplated brass 1 -1/2" tailpiece. For dimensions of all sinks, length means left- to-right measurement, width means front -to- back measurement. Sinks shall be Elkay manufacturer as specified, or approved Just. B Sink Single Compartment (P7 -1): Elkay Model LR 1522; overall length 15 width 22 bowl, length 11 1/2 width 16 depth 7 1/2" 1. Faucet: Chicago Faucet No. 786-FC rigid gooseneck, with flow control, plain tip, No. 317 wrist handles; supplies at 8" centers. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS C. Sink Double Compartment (P7 -2): Elkay Model LR -2922; overall length 29" width 22 each bowl, length 11 1/2" width 16" depth 7 -1/2" 1. Faucet Chicago Faucet No. 989, No. L9 -FC, 9 -1/2" swing spout threaded with flow control, No. 317 wrist handles; supplies at 8" centers. D Sink Single Compartment (P7 3): Elkay Model ILR 3322L, overall length 33" width 22" with lefthand drain board; bowl, length 16" width 16 depth 7 1/2" 1. Faucet Chicago Faucet No. 786-FC rigid gooseneck, with flow control, plain tip, No. 317 wrist handles; supplies at 8" centers. E. Sink Single Compartment (P7 -4): Elkay Model LR -1522; overall length 15 width 22 bowl, length 11 1/2" width 16 depth 7 -1/2" 1. Faucet and Control: Chicago No. 834-EP -SLO wall mounted self closing foot control mixing valve, No. 626 -FC high gooseneck spout with removable threaded plain tip, No. 327 drain with perforated strainer and 1 1/2" tailpiece. F Sink Single Compartment (P7 -5): Elkay Model DLR -2522; overall length 25" width 22 bowl, length 21" width 15 3/4 depth 12" 1. Faucet Chicago Faucet No. 786-FC rigid gooseneck, with flow control, plain tip, No. 317 wrist handles; supplies at 8" centers. 2.9 MISCELLANEOUS SECTION 15440 PAGE 5 PLUMBING FIXTURES AND TRIM A. Supply and Drain Unit (P12 -1): Guy Gray Model FB -200, 16 -gauge standard steel unit with steel screws, recessed into wall, chromeplated 1/2" hot water and cold water valves, MPT brass sweat connections, arranged for bottom supply, 2" drain outlet with lock nut and slip nut. B Supply and Drain Unit (P12 -2): Guy Gray Model PL200LV 0.80' high impact ploystyrene box with knockouts in the top and bottom for water supply Center 2' drain for PVC or ABS pipe connection. C. Thermostatic Control Station/Darkroom Supply Panel (P14 -1): Leonard Valve Company "Mark II" "Photomaster" complete with Type "M" thermostatic water mixing valve, "Dura -trol" thermostat, color -coded dial indicators, adjustable safety stops set for maximum temperature, combination checkstops on inlets, volume control and shutoff, dial -type thermometer, vacuum breaker, piping and fittings with union connections, enclosed in Type 304 stainless steel panel -type cabinet with flanged cover for recessed wall installation; 1/2" inlets, 3/4" outlets, all exposed parts chromium plated. D Air Gaps: Provide between fixture wasted outlet and building drainage system, in water connections to certain items of equipment, such as coolers, sterilizers, etc. Air gaps, cast -iron Smith Fig. 3955 or 2490 Series. Provide polished chrome plated finish where exposed to view E. Wall Hydrant (NFWH): 3/4' hose connection, atisiphon nonfreeze type wall hydrant with integral vacuum breaker bronze casing, hose connection and working parts, loose -key operated; Smith Fig. 5609QT or Wade Fig.8620. 1. Finish: Nickle bronze face. 2.10 FLOOR DRAINS A. General: Unless otherwise specified, all drains, shall have cast -iron bodies. Drain outlet size, as indicated on the drawings. Drains shall generally consist of a body, integral seepage pan and adjustable perforated or slotted strainer consisting of grate and threaded collar Drains shall be of double pattern suitable for embedding in the floor construction. The seepage pan shall have weep MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS SECTION 15440 PAGE 6 PLUMBING FIXTURES AND TRIM holes or channels to permit drainage from the pan to the drain pipe. The strainer shall be adjustable to varying floor thicknesses. All drains shall be provided with trap primer connections, except shower drains Each drain shall be provided with a P -trap and vent. Drains with integral no-hub outlet are acceptable. 1 Drain Flanges and Clamps: All drains installed in slabs that are not slab -on -grade shall include drainage flanges. All drains in membraned floors shall include flange and membraned clamping ring. 2. Finishes: Strainer of drains in showers shall be chrome plated bronze or polished nickel bronze; strainers in all finished areas, including stairwells, temporary unfinished areas, etc., shall be polished nickel bronze. Strainers and grates in unfinished areas, such as boiler rooms and mechanical equipment rooms, shall be galvanized cast iron or chromate converted cadmium or zinc electroplated coating, unless otherwise specified. B Drains General Type 1. Floor Drain General Service (D-3): Cast -iron body, flashing collar with protector cap, polished nickel bronze adjustable strainer head with heelproof grate 1/4' square boles and trap primer connection. Drains with square top pattern shall be provided in floors finished of material in square or straight line patterns, Wasde 1100 -GK, Smith Fig 2010 -B, or Zurn No. ZN415 -Y 2. Floor Drains- Showers (D-1): Cast -iron body flashing collar with protector cap, 6" round chromium plated bronze or polished nickel bronze adjustable strainer head vandal proof screws. Smith Fig. 2010 -A, Wade No. 1100 STD -CP or Zurn Z415. For square pattern head, Wade 1100 -GK, Smith Fig. 2010 -B, or Zurn ZN415 -Y 3 Floor Drain- Combination Funnel Type (D -2): Combination funnel floor -type drain, cast -iron body with adjustable strainer head with drainage flange, trap primer connection. Polished nickel bronze 8' diameter top, with polished nickel- bronze 8 -1/4' x 3 -1/2' funnel. Attach funnel by bolting from underside, with grate bars cut out within funnel. Drain, Smith Fig. 2010 -A3591 NB or Wade 1100 -STD 8 EG8 -I -MOD Drains with square top pattern shall be provided in floors finished or material in square or straight line patterns, 8 "x8' 2010 -B- 3591 -NB or Wade W 1100- G8 -EG8 -MOD 2.11 ROOF DRAINS A. General: All drains shall have cast -iron bodies. Drains shall generally consist of a smooth large volume sump, combined flashing collar and gravel stop with seepage openings and bayonel locking device for securing dome, rustproof bolts, low profile nonrusting dome with debris guard slots and safety slots. All drains except poured -in -place installations shall be provided with underdeck clamp to secure roof drain firmly to the roof. Drains shall be provided with adjustable extension sleeve or integral with body in all installations when insulation is used; and with secondary flashing ring to secure vapor bather on top of the roof slab. All drains except poured -in -place installations shall have sump receiver plate of design to accept drain body flange. Domes of all roof drains shall be weather resistant cast -iron unless noted otherwise. For no-hush piping installation, drains shall be provided with outlet adaptors. Drains with integral no-hub outlet are acceptable. B Roof Drain -For Insulated Built -Up Membrane Roofs (RD): Cast -iron body, 16" diameter, low profile dome, flashing collar 1/16' thick perforated brass gravel guard height to suit roof insulation and fill; Smith Fig. 1011 or Wade 3000 -DP C. Roof Drain- (ORD): Similar to RD above, with the minimum 2: high water dam. D Roof Drain- Canopy Type (RD): Cast -iron body, side outlet, 8 -1/2' diameter, 4'1/2' high cast -iron dome, flashing collar and gravel stop; Smith Fig. 1340 or Wade 3220A. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDTTIONS ALTERATIONS 2.12 CYSTO FLOOR DRAIN A. Floor Drain- Flusching Rim Type: Cast-iron body with acid resistant enamel coated interior, flashing flange, flushing rim, 3/4' flushing connection, solid stainless steel 8' diameter hinged grate Smith Fig 2500C or Wade 9300. Flush valve, concealed diaphragm type with. 3' metal push button, Sloan 152- 1.6 gph. 2.13 HOT WATER DISPENSER A. Provide the hot water dispenser Mount at drilled opening in countertop sink. Unit shall be In- Skink- Erator Model GN -3, chrome finish, 1/2 gallon of 190°F water per hour capacity, snap action adjustable thermostat (140 °F to 200 °F) factory set at 190 °F• 1300 watts, 11.3 amps, 120 VAC; tank insulation shall meet UL 94 BF-1, instant self- closing valve. 2.14 BACKFLOW PREVENTOR A. Back low Preventor Double Check Valve Type: Hersey "Beeco' Zurn/Willrins, Cla -Val, Febco or approved manufacturer. Use only where specifically noted. 2.15 TRAP PRIMERS A. Mechanical Trap Primers: Adjustable -type automatic trap seal valve, pressure differential actuated, 1/2' minimum, E S Valve, Inc. or Precision Plumbing Products manufacturer 2.16 OVERFLOW ROOF DRAIN OUTLET A. Downspout Nozzles: Wade W -3940 or Smith Fig. 1770, bronze body and wall flange nickel bronze finish. 2.17 WATER HAMMER ARRESTERS 3.2 WALL HUNG FIXTURE CARRIER SECTION 15440 PAGE 7 PLUMBING FIXTURES AND TRIM A. Provide shock absorbing water hammer arresters in hot and cold water piping to plumbing fixtures, nitrogen precharged and permanently factory sealed, expansion bellows type shock arrester, unit constructed entirely of stainless steel, threaded nipple connection, PDI tested and certified; Smith Fig. 5005 `Hydrotrol' or Wade Fig. "Shokstop' or approved Zum. PART 3 EXECUTION 3.1 GENERAL A. Where trim or rough -in is not specified, provide all necessary for the completion of the job, and of the same quality as elsewhere specified. A. All fixtures except lavatories and sinks with stanchions and water closets shall be provided with back up plates built into the wall and embedded bolts attached thereto. B Lavatories and sinks with stanchions shall be installed with hangers built into the wall. Anchor rectangular tubing stanchions base support to the floor slab with anchor bolts and attach the stanchions to the wall framing above the fixture. Provide anchor bolts for all manufacturer provided locations in base support. C. Wall-hung water closet shall have wall surfacing extended across face of wall over the fixture hangers with sleeves at fixture banger bolts; plastic spacers not allowed. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS 33 FIXTURE AND ACCESSORY LOCATIONS SECTION 15440 PAGE PLUMBING FIXTURES AND TRIM A. Install plumbing fixtures at the heights listed below Certain combinations or conditions may require changes. Changes shall be referred to the Architect for specific instructions before proceeding with that portion of the work. In the event special details or elevations are drawn for one or more items, the special detail shall govern for those specific conditions. Stan d Handicap Lavatories, rim 33 -inch Lavatories, rim, wrist action 34-inch 33 -inch Closets, top of seat 15 -inch 17 -inch Shower valves 42 -inch 40 -inch to valve centerline Showers, bottom of head 6 -feet Clinic sink, rim 29 -inch Scrub sink, rim 38 -inch 1. Check Architectural drawings to see if they have fixture height scheduled or shown. Check State requirements for mounting heights. Shower head heights to be verified; adults, children and athletic facilities have different mounting requirements. 2. 40 -inch height of shower valve for handicapped is for a transfer shower (i.e., where patient transfers to a seat and wheelchair does not go into shower; this is a small shower). Use 36 -inch height for a roll-in shower (i.e. where patients can roll wheelchair into shower).* B. Heights for lavatories and toilets are from finish floor line to top of rim. Verify width of toilet stalls and locate toilets on center line of each stall unless shown otherwise. Verify with Architect before installation. 3.4 PLUMBING CONNECTIONS FOR EQUIPMENT FURNISHED BY OWNER OR UNDER OTHER DIVISIONS OF THE SPECIFICATIONS A. Plumbing Equipment 1. Connect equipment and/or fixtures requiring plumbing connections. 2. Provide any necessary traps, tailpieces, valves and faucets for equipment or fixtures. 3 Provide the waste size necessary for drainage of the fixture or equipment and roughed -in as called for on the approved shop drawings. Minimum waste not less than 1 -1/2 -inch pipe. 4 Provide water, gas and steam pipes with an accessible shutoff valve in the pipe at each fixture or equipment. On equipment with quick opening valves, provide water hammer arresters. 5 Escutcheon: At each point where pipe or other fitting enters the wall at a fixture. 6. Exposed piping: Exposed piping in finished areas chromium- plated. Keep to a minimum exposed piping. 7 Special equipment: For equipment installed and connected by others, provide floor drains and valved and capped water lines, or capped waste connections as shown on the drawings. 8. Provide thermometers, tempering valves, aquastats and control valves necessary for the operation or adjustment of equipment not supplied as part of the equipment. 9 Provide stainless steel self -rim for all countertop sinks. 10. Provide wall carrier fittings where specified and as required for wall mounted fixtures. Where special wall carriers are not specified, provide carrier or hanger clips furnished as standard for the particular fixture. MAHLUM NORDFORS MCIITLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 35 MISCELLANEOUS A. At handicap lavatories, insulate waste trap and cover with Zeston jacket. 3.6 AUTOMATIC TRAP PRIMER SECTION 15440 PAGE 9 PLUMBING FIXTURES AND TRIM A. Provide a distribution unit when priming more than one trap with a single primer valve, up to a maximum of 4 traps. NOTE. 1. Primer valve requires a pressure drop in the water supply system of 5 psi (this will be satisfied if there are flush valves in the bldg. per PPP rep. who talked to Sloan rep. a flush valve will cause approximately 8 -10 psi drop). If no flush valves in building, use an Oregon #1 which is a plastic body valve good with only 1 psi fluctuation. 2. Don't allow any other product substitute which requires greater than 5 psi drop (e.g. E&S manufacturer.). B Provide trap primer for all floor drains, where drain traps are indicated to be primed and where required by the Plumbing Code. Piping shall be as specified for water piping, 1/2 -inch minimum size; chrome plated brass pipe where exposed. Connect primer line at the top of a horizontal cold water line and install the trap primer valve and distribution unit in an accessible location. 3.7 TRAP PRIMER ASSEMBLY WITH TIMER A. At contractor's option a complete trap priming system as described here may be provided in lieu of method described above, at no additional cost to the owner B. Provide entire trap primer assembly complete as indicated with piping, valves, all equipment, components and appurtenances. 1 Solenoid Valve: Asco Model 8210D95, brass body teflon disc, 3/4 -inch size, 120 volt, 60 cycle, 11 watt rating, 5 Cv flow factor, 0 psi minimum operating pressure differential, 125 psi maximum operating pressure differential, normally closed, 2 -way valve. 2. Timer Intermatic LS7141, 120 volt, single phase, 60 cycle timer set to energize solenoid valve for two minutes each 24 hours with operation set for 12 :00 a.m. midnight. Time switch shall be installed (with interconnecting wiring) under, Division 16. 3 Fixed Air Gap: Jay R. Smith Figure 3951, 1 1/4 -inch x 2 -inch coated cast iron. 4 Headers: Detail and schedule of number of headers shall be as indicated. 5 Piping shall be as specified for water piping, 1/2 -inch minimum size; chrome plated brass where exposed. Distribution piping to traps shall be sized and routed to provide uniform evenly distributed flow throughout. 3.8 WATER HAMMER ARRESTERS A. Install exact sizes selected from manufacturer's tables to match branch pipe sizes, fixture units of attached fixtures and equipment and to suit system pressure expected at point of installation. Attach to tee in piping in all cases. Placement and connections shall be per ANSI A112.26.1, with the exception that a water hammer arrester is not required on a branch line which has only a single fixture unless there is a line mounted water solenoid valve in the branch line. END OF SECTION 15440 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS PARli GENERAL 1.1 WORK INCLUDED A. Work under this section shall include furnishing all labor, material, tools and equipment necessary for the complete installation of the special piping systems as specified, including all piping, tubing, fittings, .valves, gas manifolds, equipment, specialties and accessories. Work shall comply with all applicable city and state codes and ordinances. In case of conflict with drawings or specifications, the codes and ordinances shall govern. B Special piping systems shall include: Medical oxygen. Medical air. Nitrous oxide. Medical vacuum. Nitrogen. SECTION 15480 PAGE 1 MEDICAL GAS SYSTEMS C. Provide all alterations and additions to the existing special piping systems, including medical gases and medical vacuum systems. 1.2 QUALITY ASSURANCE A. Qualifications: All systems shall be complete in every respect and ready to be put into operation. All materials shall be new and of the best grade and quality obtainable, and workmanship shall be first class throughout. B Testing of Medical Gas and Medical Vacuum Systems: Contractor shall perform the testing of oxygen, nitrous oxide, medical air and medical vacuum piping, valves and fittings in strict accordance with the methods and procedure as stipulated by Chapter 4 of NFPA 99 including pressure testing, cross connection testing and final purging and analyzing. At the completion of all testing, the Contractor shall submit a letter certifying the systems to be in perfect operating order and in compliance with Chapter 4 of NFPA 99 C. Alterations and Revisions to Existing Medical Gas Piping System: Provide tests and documentation that tests have occurred in compliance with Washington Administrative Code, Section WAC 248 -18 -280 and Section 15990, "Testing, Adjusting, and Balancing." D Manufacturer Manufacturer of medical gas, air and vacuum system components and specialties shall be Chemetron Medical Products, Ohio Medical Products, or approved Oxequip. Vacuum and compressor units shall be Nash Engineering Co., Busch, Sihi, Ohio or Chemetron manufacturer. 1.3 JOB CONDITIONS A. Existing Conditions: Contractor shall closely coordinate with the Owner to furnish equipment compatible with the Owner's existing medical gas connections. New outlets shall match existing outlets in order to facilitate the use of both existing and new equipment throughout the hospital. B Continuity of Service: Closely coordinate a schedule with the Owner in writing, giving sufficient notice before shutting down any special piping system service. Arrange the work so shutdown of any existing service is kept to a minimum. Schedule time of cutover of oxygen and nitrous oxide facilities at a time when oxygen bulk storage is low* and for nitrous oxide, when gas usage is at a minimum to MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS permit supply of these requirements with portable equipment. 1.4 REFERENCED STANDARDS A. Applicable Publications: Current publications of the issues listed below, referred to thereafter by basic designation only, form a part of this specification to the extent indicated by references thereto. B National Fire Protection Association (NFPA): No. 99 Standard for Health Care Facilities. C. Compressed Gas Association, Inc. (CGA): Pamphlet V 5 Diameter Index Safety System. Pamphlet P 2.1 Standard for Medical Surgical Vacuum Systems in Hospitals. Pamphlet G -7 Compressed Air for Human Respiration. D Underwriters Laboratories, Inc. (UL). F American National Standards Institute, Inc. (ANSI): B16.5 Steel Pipe Flanges and Flanged Fittings. B16.22Wrought Copper and Copper Alloy Solder Joint Pressure Fittings. SECTION 15480 PAGE 2 MEDICAL GAS SYSTEMS E. American Society for Testing Materials (ASTM): Al20 Black and Hot Dipped Galvanized Welded and Seamless Steel. A181 Forgings; Carbon Steel for General Purpose Piping. A216 Carbon Steel Casings Suitable for Fusion Welding for High Temperature Service. B88 Seamless Copper Water Tube. B819 Seamless Copper Tube for Medical Gas Systems. PART 2 PRODUCTS 2.1 MEDICAL OXYGEN SYSTEM A. Pipe and Fittings: Pipe, Type "K" seamless copper tubing, ASTM B88 or ASTM B819 hard- drawn. Pipe shall be specially manufactured for oxygen, shall be so marked by the manufacturer, shall be received and sealed on the job. Fittings; wrought copper, brass or bronze, made especially for solder or brazed connection; all joints made with silver brazing alloy or similar high melting point (at least 1000 °F) brazing metal. Flux shall not be used. Listed or approved gas tubing flared or compression type fittings may be used at limited exposed and accessible locations in compliance with NFPA 99, Chapter 4 B Source of Supply An extension of the existing system. C. Emergency Exterior Inlet Assembly 2.2 NITROUS OXIDE SYSTEM A. Pipe and Fittings: Pipe, Type "K" seamless copper tubing, ASTM B88, hard -drawn for exposed locations. Fittings; wrought copper, brass or bronze, made specially for solder or brazed connections; all joints made with silver brazing alloy or similar high melting point (at least 1000 °F) brazing metal. MAHLUM NORDFORS MCICINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Flared tubing fittings may be used at limited exposed and accessible locations in compliance with NFPA 99 Chapter 4 B Source of Supply The central supply of nitrous oxide shall be a free standing fully automatic manifold, Chemetron "Autoflow,," Ohio Medical "Unimatic II," or approved manufacturer. Nitrous oxide manifold shall consist of wall- mounted control cabinet, all necessary header connections and pigtails and controls so arranged as to have an equal number of cylinders in service and in reserve. The numben and arrangement of cylinders shall be 6 cylinders in service and 6 cylinders in reserve. 1. Manifold Controls: Fully automatic switchover from service to reserve bank without fluctuation in the hospital line service. The manifold controls shall be housed in 16 -gauge baked enamel sheetmetal weatherproof cabinet, shall include one pressure regulator for controlling service bank and another pressure regulator for controlling reserve bank; a line pressure regulator with valved bypass; line, intermediate and high pressure gauges; low pressure shutoff valves; 250 psi safety relief valve with flare fittings for attaching to vent line; union connection for interface with hospital main; bleeder valve for use in adjusting regulators and pressure switch; 24-volt red and green pilot lights for indicating switchover from primary to reserve supply; pressure switch with orifice nipple for actuating 24 -volt switchover alarm system, and a switchover lever mechanism. System pressure shall be not less than 160 psi. Manifold shall bear label of Listing Under Re- examination Service of the Underwriters Laboratories, Inc. 2.3 NITROGEN SYSTEM SECTION 15480 PAGE 3 MEDICAL GAS SYSTEMS A. Pipe and Fittings: Pipe, Type "K" seamless copper tubing, ASTM B88, hard- drawn. Fittings, wrought copper, brass or bronze, made specially for solder or brazed connections; all joints made with silver brazing alloy or similar high melting point (at least 1000 °F) brazing metal. Flux shall not be used. B. Source of Supply The central supply of nitrogen shall be Chemetron High Volume Nitrogen Manifold, Series 86 -19 with M -800HF control or approved Ohio Medical, or Oxequip manufacture. Nitrogen manifold hail consist of wall- mounted control cabinet, all necessary header connections and pigtail and controls so arranged as to have 6 cylinders in service and 6 in reserve. 1. Manifold Controls: Fully automatic switchover from service to reserve bank without fluctuation in the hospital line service. The manifold controls shall be housed in 16 -gauge baked enamel sheetmetal weatherproof cabinet, shall include one pressure regulator for controlling service bank and another pressure regulator for controlling reserve bank; a line pressure regulator with valved bypass; line, intermediate and high pressure gauges; low pressure shutoff valves; 250 psi safety relief valve with flare fittings for attaching to vent line; union connection for interface with hospital main; bleeder valve for use in adjusting regulators and pressure switch; 24 -volt red and green pilot lights for indicating switchover from primary to reserve supply pressure switch with orifice nipple for actuating 24 -volt switchover alarm system, and a switchover lever mechanism. System pressure shall be not less than 160 psi. Manifold shall bear label of Listing Under Re- examination Service of the Underwriters Laboratories, Inc. C. Nitrogen Control Panel: Wall- mounted, recessed, nitrogen pressure control cabinet shall consist of line pressure control regulator, pressure gauge, diameter index safety system type nitrogen service outlet, and service valve; all assembled and rigidly mounted in a steel roughing -in assembly for full wall recess. Line pressure regulator shall have a 5 to 180 psi regulating range and shall be of the self relieving type, furnished with a chromeplated "tee" handle for ease of pressure adjustment. Pressure gauge; 0 to 300 psi regulated pressure gauge, with dial face having a shaded area of 90 to 110 psi for visual reference for pneumatic equipment operating in that pressure range, and another shaded area 140 to 160 psi for visual reference for pneumatic equipment operating in that pressure range. The cabinet shall be provided with a No. 4 finished stainless steel coverplate with control identifications and operating instructions imprinted. Cabinet shall include a nitrogen wall outlet. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS 2.4 MEDICAL AIR SYSTEM SECTION 15480 PAGE 4 MEDICAL GAS SYSTEMS A. Pipe and Fittings: Pipe, Type "K" seamless copper tubing, ASTM B88, hard- drawn. Fittings, wrought copper, brass or bronze, made specially for solder or brazed connections; all joints made with silver brazing alloy, or similar high melting point (at least 1000 °F) brazing metal. Flux shall not be used. Flared tubing fittings may be used at limited exposed and accessible locations in compliance with NFPA 99, Chapter 4. B. Source of Supply 1. Air Compressor. Chemetron Medical Products "Space Saver Duplex," or approved. Unit shall be air cooled, oil free, nonlubricated cylinders, single- acting, two cylinders, single- stage, horizontal tank- mounted, V -belt drive, reciprocating continuous duty type factory packaged air compressor, including air cooled aftercooler, pressure switches, automatic transfer switch, drives, belts, filters, pressure regulators, gauges, starters and 200 psi wp, ASME constructed tank with safety valve 2. Inlet Filters: Provide adhesive coated permanent media type inlet filters, Burgess Manning or approved. Inlet pipe shall terminate above roof and shall be protected from weather 3 Control shall consist of pressure switch to start and stop the motor with automatic alternator to switch compressor on successive starts. 4 Isolation: Flexible pipe connections shall be provided at all connections to compressor Units shall be mounted on steel spring isolators specified in Section 15240, "Mechanical Sound, Vibration, and Seismic Control." 5 Regulator and Filters: Provide pressure reducing valve to 50 psi with 3 -valve bypass and Y- strainer, two filters with shutoff valves piped in parallel, high -low pressure switch for alarm system and pressure gauges for high side, for regulator discharge (filter inlet) and for filter discharge. Pressure regulator shall be Fisher 95H or approved, 1" size, with cast -iron body stainless steel diaphragm and valve seat, spring range from 25 to 75 psi, set approximately 50 psi discharge pressure, with filter cartridge specifically designed to remove moisture, scale and oil from compressed air lines. Provide six spare filter cartridges. 6. Receiver Horizontal ASME constructed and labeled air receiver with pressure gauge, drain cock, discharge line stop valve, safety valve and heavy support feet. 7 Control Panel: The duplex unit shall be equipped with factory- mounted panel on the compressor package, including all wiring between compressors and panel. Panel shall be NEMA 1 control panel for sequential operation of the two air compressors. Panel shall include two automatic across- the -line full voltage magnetic motor starters with third leg overload protection, two fusible disconnects, one automatic ratchet relay two terminal strips, door safety interlock, all internal wiring and control wiring. Panel shall be furnished complete, requiring only single -point electrical service connection. C. Intake Silencer. Provide in -line silencer to silence the high velocity air flow in air compressor intake piping from atmosphere. Silencer shall be absorption type having a perforated air passage tube entirely enclosed by a sound absorption material encased in the outer shell. Resistivity to flow through silencer shall be approximately equivalent to an equal length of straight pipe. The silencer shall be of heavy duty leak- resistant construction with continuous welded shell seams, double -seal crimped ends, and female pipe connections on both ends. The silencer shall have capacity suitable for total scfm delivery of the duplex compressed air unit; shall be Ohio Medical No. 395 5200 -300 series, Type "UH." 25 MEDICAL VACUUM SYSTEM A. Pipe and Fittings: Type "L" hard -drawn copper tubing with wrought copper fittings soldered with 95/5 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.6 VALVES FOR SHUTOFF AND ZONING SECTION 15480 PAGE 5 MEDICAL GAS SYSTEMS tin antimony solder. Vacuum piping shall be made up with plumbing crosses, rather than tees and elbows, with the unused outlets closed with threaded plugs to facilitate rodding the piping. Slope piping to the vacuum receiver tank to aid in the removal of any moisture in the system. System shall comply with requirements of NFPA 99 B. Vacuum Pumps: Duplex pump unit shall consist of tank- mounted vacuum pumps, including complete interconnecting piping and operating controls for a complete operable system. Capacity of pumps and tank shall be as shown on the drawings. Manufacturer shall factory test and certify that actual performance is within 5% of scheduled requirements. System operating pressure shall maintain a minimum of 19" Hg in the vacuum tank. Manufacturer of the packaged duplex vacuum pump units shall be Nash Engineering Company Model OV series, or Busch, Inc., or Siemen Rinsch "SIVAC," or Chemetron Products. 1. Vacuum pumps shall be single stage, positive displacement, liquid sealed rotary pumps. Pumps shall have enclosed rotors with adjustable internal clearance. Pumps shall be equal to Nash Model AHC. 2. Motor shall be flexibly coupled to pump. Provide guard over coupling. 3 Vacuum tank shall be welded galvanized steel ASME Code construction for 150 psi and shall include tank drain valves, piping and vacuum release valve to permit draining the tank without the loss of vacuum in the building piping system. Provide welded structural steel rigid pump frame and steel tank base with anchor lugs for securing to concrete base pad. 4 Components shall include a discharge separator silencer, seal- waterline strainer, flow control valve, 120 -volt solenoid valve, antisiphon fitting, pressure reducing valve in supply water, pump inlet check valve and seal water shock arrestor. Also provide panel- mounted vacuum switches, panel- mounted vacuum gauge. Starter shall be magnetic type with 3 -leg protection. Integral NEMA 12 control panel shall be completely factory wired, complete with disconnects for single -point electrical service connection. 5 Control. Vacuum switch shall start the lead pump at 19" Hg and stop the pump at 25" Hg. The other vacuum switch shall start the lag pump at 18" Hg and stop the pump at 24" Hg. Automatic alternator shall switch the lead and lag pump each starting cycle. C. Vacuum Exhaust Line: Provide vacuum exhaust line from discharge of each pump, through the muffler, and out through the roof of the building where it shall terminate in a return bend 1-6" above the roof. The pipe shall be flashed same as specified for plumbing vents. All piping and fittings above the roof shall be galvanized A drip leg of minimum 10" with drain valve shall be in line at each pump. Exhaust line shall be connected to pumps with flexible connectors as recommended by the manufacturer D Isolation: Units shall be mounted on inertia bases with steel spring isolators specified in Section 15240 "Mechanical Sound, Vibration, and Seismic Control." E. Vacuum Exhaust Silencer Provide in -line silencer to silence the high velocity air flow in vacuum pump discharge piping to atmosphere. Silencer shall be absorption type having a perforated air passage tube entirely enclosed by a sound absorption material encased in the outer shell. Resistivity to flow through silencer shall be approximately equivalent to an equal length of straight pipe. The silencer shall be of heavy duty, leak resistant construction with continuous welded shell seams, double seal crimped ends, and female pipe connections on both ends. The silencer shall have capacity suitable for total cfm delivery of the duplex vacuum pump unit; shall be Ohio Medical Type "UH" or approved. A. Shutoff Valves: Valves shall be bronze bodies, ball type with double 0-ring stem seals, Teflon or MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS neoprene seat seals, 300 psi minimum working pressure, full flow through design. Valve body fully enclosed bolted pattern to permit valve swing out in line for ease of installation and maintenance. All valves shall be specially prepared for oxygen service and shall conform to NFPA`99 Valves shall be so designed that only a quarter turn of the lever -type handle is necessary between the open and closed positions; gas labels indicating service shall be provided on each valve handle. B. Zone Valves in Recessed Boxes: Full recessed valve box for single or multiple gas services as required, complete with shutoff valve, as specified above, for each service. Box shall be 18 -gauge sheet steel, finished with air -dried lacquer or baked enamel; cover, 18 -gauge sheet steel, satin chromed finish or etched and anodized aluminum cover. Mounted in the finishing frame shall be a clear, rigid, vinyl window with a ring attached which, when pulled, will remove window for easy access to the valve. Window and box shall contain proper caution labels in compliance with NFPA 99 1. Gauges: Provide in zone valve box, downstream side of each zone valve, as required by NFPA 99, to monitor medical gas distribution pressures and vacuum. Gauges shall be 1 -1/2 with plastic protective dial faces, built into the valve box. 2. Tubing Extensions: Tubing extensions, where required for valves, shall be factory- soldered to the valve flanges for connection to piping outside the box. Valves and tubing extensions shall be chrome plated, pre- assembled, pressure tested and rigidly mounted to the box for ease of installation. A color -coded gas label which can be marked to indicate the area controlled shall be supplied with each valve. 2.7 STATION OUTLETS SECTION 15480 PAGE 6 MEDICAL GAS SYSTEMS A. General: Outlets shall incorporate automatic shutoff, color -coded service indication, safety keying for noninterchangeability of secondary equipment, and shall be Underwriters Laboratory labeled. Outlets in anesthetizing areas shall be equipped with a grounding lug for connection to the grounding system by the Electrical Contractor Rough -in boxes, where required, shall be adjustable for varying thickness of wall finish material and shall include a keying system to assure that valve and faceplate assemblies are connected to the proper service. B Wall Outlets: Outlets shall be DISS type, for single or multiple services with valves, recessed rough -in boxes and common coverplate. See the outlet schedule on the drawings and architectural room elevations. C. Fixed Ceiling Outlets: Where shown and scheduled on the drawings provide single outlets, or multiple service outlets with a common faceplate, complete with mounting box, valve, and finish faceplate with service identification. Outlets shall be DISS (Diameter -Index Safety System) noninterchangeable type with automatic valve, conforming to CGA, Pamphlet V -5 A length of pressure hose with safety-keyed check valve connection, and hose retractor, shall be provided for each ceiling outlet terminating 6'-0" above the floor, conductive -type, color coded for identity of service. D Nitrogen Outlets: Nitrogen ceiling outlets shall be manufactured particularly for 160 psi nitrogen, shall be DISS safety type, per CGA, Pamphlet V-5, shall not "jet" when being connected or disconnected with external equipment. Outlet shall be incorporated under a single coverplate 1 Nitrogen Wall Outlets: Quick connect type outlet station, manufactured particularly for 160 psi nitrogen. Outlets shall be designed to prohibit removal of secondary fittings prior to release of pressure to the outlet, and avoid ejecting adapters or hose fittings under high pressure. Outlet station shall have a stainless steel faceplate, color and service coded for identification, and incorporating a locking wheel on the valve mechanism, clearly labeled with operating instructions, to lock adaptors and activate gas flow 2.8 ALARM SYSTEMS (MEDICAL GASES MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15480 PAGE 7 MEDICAL GAS SYSTEMS A. General: Provide alarm systems to assure continuous responsible monitoring of the medical gas systems. Alarm systems shall be Chemetron, Ohio Medical or Oxequip manufacturer Each signal light, pressure switch and pressure gauge shall be appropriately labeled. All alarm systems shall be energized from the emergency electrical power system. Coordinate power supply points and requirements with Division 16 of work. B. Master Alarm System: The medical gas and vacuum alarm signal panel shall be a closed circuit, self monitoring type. Alarm shall be used to monitor medical air, nitrous oxide, nitrogen and vacuum, but shall have additional capacity to monitor oxygen piping systems pressure. A green "Normal" light will glow for all systems normal. If any abnormal condition signal is received from remotely mounted switches, the green light will go out and both an audible warning device will sound and the abnormal condition red light will come on. A switch shall be supplied to silence the warning device. However, the "Abnormal" light shall remain on until the condition has been corrected. If two or more abnormal conditions occur, their condition will be indicated on the alarm panel until corrected. Only after all conditions have been corrected will the "Normal" light glow again. A test switch shall be supplied to test all light bulbs and the audible warning device. 1. Alarm panel shall be self contained with 24-volt transformer, fuses, factory prewired to built -in line pressure switches. Alarm panel shall require 115 -volt, single -phase electrical service. Master alarm panel shall be located at the Emergency Nurse Station. 2. Slave alarm panel shall be provided, identical in all respects to the master alarm panel except indicating pressure gauges shall not be required. Slave alarm panel shall be located Maintenance/Shop. 3 The alarm system shall be of such design that one, two or more monitors may be connected to a single pressure switch, and all will work as described above. Alarm system shall be designed in accordance with NFPA 99, Chapter 4 requirements. 4 Systems: The following signals shall be displayed at each alarm station. Provide a panel signal light for each system point monitored; wording, similar to that listed. Panel Signal Light Activating Switch Location Oxygen liquid low— reorder Bulk oxygen storage Oxygen reserve in use Bulk oxygen storage Oxygen reserve low reorder Bulk oxygen storage Oxygen line pressure high Building side of building shutoff valve Oxygen line pressure low Building side of building shutoff valve Nitrous oxide reserve in use Supply manifold Nitrous oxide line pressure high Building side of building shutoff valve Nitrous oxide line pressure low Building side of building shutoff valve Nitrogen reserve in use Supply manifold Nitrogen line pressure high Building side of building shutoff valve Nitrogen line pressure low Building side of building shutoff valve Air line pressure high Building side of medical air supply shutoff valve Air line pressure low Building side of medical air supply shutoff valve Vacuum line pressure low Building line at vacuum pump C. Switches: Provide a pressure switch for "High Pressure" and "Low Pressure" signals to the alarm panels. Switches shall be installed in respective medical gas mains downstream from main shutoff valves and in lines, located as required in NFPA 99, for the area alarms. For line vacuum below normal, provide vacuum switch. D Orifice Nipples: Provide with each pressure switch to allow repair or replacement of the switch without shutting down the pipeline system. MAHLUM NORDFORS MCIGNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS SECTION 15480 PAGE S MEDICAL GAS SYSTEMS E. Area Alarm Systems: Provide the point -of -use line pressure area alarm systems. The self contained line pressure and line vacuum alarms shall be the closed circuit, self monitoring type. Alarm shall be used to monitor oxygen, nitrous oxide, vacuum, air, oxygen carbon dioxide mix, and nitrogen at the OR s. At all other areas the alarm shall be used to monitor oxygen, vacuum and air. A green "Normal" light will glow for all systems normal. If any monitored line pressure becomes high or low, the green light will go out and both an audible warning device will sound and the "Line Pressure Abnormal" red light will come on. The built -in gauge will indicate the pressure or vacuum at all times. A switch shall be provided to silence the warning device; however, the "Line Pressure Abnormal" light shall remain on until the condition has been corrected. If two or more "Line Pressure Abnormal" conditions occur, their condition will be indicated on the alarm until corrected. Only after all conditions have been corrected will the "Normal" light glow again. A test switch shall be provided to test all light bulbs and the audible warning device. Alarm shall be complete, with internal switches, gauge, solid -state control unit, and 115/24 -volt transformer An 8" length of 1/4" nominal I.D type K copper tubing swedged at the end shall be supplied for connection to the service line. Each alarm signal panel shall require 115 -volt, single -phase electrical service. Roo i i No. Surgery Nurses Station 02- Air -N20- Vac -N2 Recovery Nurses Station 02 -Air Vac Patient Nurses Station 02 Vac Chair Room Station 02 -Vac F Line Pressure Monitoring Gauges: Provide adjacent to each zone valve located in corridor providing zone control of patient services, to monitor oxygen and vacuum distribution pressures downstream of zone valve. Gauges shall have stainless steel faceplates with satin finish; 1 1/2" gauges with plastic protective dial faces. Rough -in box assembly shall have 6" capped copper pigtail suitable for brazing and metal plaster shield. A secondary check valve mechanism shall be provided so that service work may be performed without interrupting the gas supply Test plugs shall be factory installed to allow system pressure testing per NFPA 99, prior to gauge installation. Line pressure monitoring gauges shall be labeled with service. G. Wiring: Provide all low voltage wiring, conduited, between master alarms and remote switches at bulk storage tanks, gas manifolds, vacuum pumps and air compressors, as well as conducted low voltage wiring between master and slave alarms, and between pressure or vacuum switches and alarms. Wiring shall be according to manufacturer's recommendations and shall comply with requirements of Division 16. The 115 -volt service to each alarm panel shall be provided by electrical subcontractor FART 3 EXECUTION 3.1 CLEANING OF MEDICAL GAS PIPING A. Before Erection: All pipe, tubing, valves and fittings shall be thoroughly cleansed of all grease, oil or other combustible materials in strict accordance with the procedures outlined in NFPA 99 All piping, tubing, valves and fittings including those supplied especially prepared for oxygen service'by the manufacturer and received sealed on the job, shall be examined internally just prior to assembly and if necessary, recleaned. B. Scrubbing and continuous agitation of the parts shall be employed where necessary to remove all deposits and ensure complete cleansing. After washing, all materials shall be rinsed thoroughly in clean, hot water C. After Cleansing: Great care shall be exercised in the storage and handling of all materials and in the condition of tools used in cutting and reaming to prevent oil or grease being introduced into the tubing. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15480 PAGE 9 MEDICAL GAS SYSTEMS Where such contamination is known to have occurred, the materials affected must be rewashed and then rinsed. 3.2 INSTALLATION A. Joints: All joints in the pipe and tubing, except those at equipment requiring screwed connections, shall be made with brazed -type wrought fittings. Suitable adaptors shall be employed for the installation of equipment provided with threaded connections. 1. Brazed Connections: All brazed connections shall be made with the type of brazing alloy specified in pipe and fittings. The joining processes shall be those recommended by the manufacturer of the pipe and the tubing and the fittings. The use of flux is prohibited in all instances. B. Bends: All changes in direction requiring turns or offsets of radiuses less than five times the pipe or tubing outside diameter shall be made by Walseal or braze -type wrought fittings. All other pipe or tubing bends may be shaped by proper bending tools and shall be free of any appreciable flattening, buckling or thinning of the tube wall at any point. C. Erection: All pipe and tubing shall be cut accurately to measurements obtained at the site of the system and shall be installed without springing or forcing. All pipe and tubing shall be protected against mechanical injury D. Inline shutoff valves intended for use to isolate existing systems being extended to new piping systems shall not be connected to the new system until all testing has been completed. E. Supports: In general, comply with requirements specified in Section 15050, "Basic Materials and Methods." Medical gas and all piping shall not be supported by other piping but shall be supported with pipe hooks, metal pipe straps, bands on hangers suitable for the size of pipe and of proper strength and quality, at proper intervals so that piping cannot be moved accidentally from the installed position. Maximum hanger spacing shall be at the following intervals: 1/2" pipe or tubing 6' 3/4" or 1" pipe or tubing 8' 1 -1/4" or larger (horizontal) 10' 1 1/4" or larger (vertical) every floor level F Underground Piping: Install in trench below frost line and not less than 3'-6" deep, adequately protected against physical damage and corrosion, or in ducts and tunnels which are not occupied by fuel oil lines. Ducts or casings shall be used wherever buried piping traverses a roadway driveway parking lot or other area subject to surface loads. Medical gas piping may be placed in the same tunnel, trench or duct with fuel gas piping, electrical lines or steam lines, if separated, provided there is good natural or forced ventilation. 1. Earthwork: Comply with requirements for earthwork specified in Division 2 G. Painting and Protective Coverings: All pipe and tubing shall be labeled and painted to indicate its gas content. 1 Pipe or tubing in corridors or other locations where exposed to damage from moving equipment shall be adequately protected. H. Testing: Testing of all medical gas and medical air piping, valves and fittings shall comply with Section 15990, "Testing, Adjusting and Balancing," and shall follow exactly the methods and procedures required by Chapter 4 of NFPA 99 including pressure testing, cross connection testing and fmal purging and analyzing. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15480 PAGE 10 MEDICAL GAS SYSTEMS I. Gases for Testing: Contractor shall pay all costs of gases required for testing. J. Valve Labeling: Valves shall be properly labeled in compliance with Chapter 4 of NFPA 99 and Section 15030, Mechanical Painting and Identification. END OF SECTION 15480 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15500 PAGE 1 FIRE PROTECTION SYSTEMS FART 1 GENERAL 1.1 REQUIREMENTS A. Requirements of the General Requirements of the Contract, the Supplemental Conditions, Division 1, and this Section apply to all work in this Division. 1.2 WORK INCLUDED A. Work includes complete design, furnishing of all material, equipment, and labor for installation of a wet -pipe automatic sprinkler system complete and ready for standard operation in the entire building. The existing sprinkler system was designed and installed lasing the pipe schedule method. Design of revised system shall be based on a pipe schedule method sprinkler system. The mechanical drawings do not attempt to show design of the system. Location of piping mains where shown on the drawings are suggested locations only Contractor shall verify exact locations and sizes of all sprinkler mains. Provide all alterations to the existing sprinkler system and extend existing system as required to provide coverage of entire remodeled areas. Verify exact location of existing piping, mains, branches, and heads. B. Work includes all alterations to the existing sprinkler systems to provide total coverage as required by the local fire marshal. Verify exact location of existing piping and heads; verify all existing main sizes. 1.3 SHOP DRAWING DESIGN A. The required drawings shall be submitted in a complete set for the entire project; partial submissions will not be acceptable. The system shall be designed and installed so that no part thereof will interfere with ceiling heights, doors, windows, or mechanical or electrical installations. Exact location of heads shall be carefully coordinated with other ceiling elements for a symmetrical pattern. Sprinkler heads shall not be located closer than 1 from lighting fixtures, diffusers, speakers, or similar devices or obstructions. Contractor shall coordinate his work with other trades so as to avoid any interference with the potential effectiveness of the automatic sprinkler system. Head spacing shall conform to NFPA 13 requirements for "ordinary hazard" rules. 1.4 SPECIAL DESIGN REQUIREMENTS A. Piping and Sprinkler Criteria: 1. Sprinkler spacing may exceed 100 sq ft except as otherwise noted, but shall not exceed 130 sq ft; 17/32" orifice sprinklers shall not be used. Minimum pipe diameter shall be 1 2. The second most remote sprinkler head shall discharge at a rate equal to the required density 3 The velocity in the overhead piping should not exceed 20' per second. Higher velocities will be permitted in riser nipples and starter pieces for throttling to achieve a balanced flow Maximum velocity in underground mains shall be 16' per second. 4 The minimum operating pressure for any sprinkler should be 7.5 psi, the maximum discharge pressure used at the starting point should be 60 psi. 5 All sprinklers shall be rated at 165°F, except in the area of heat producing equipment where NFPA 13 shall be used, or as directed by Engineer. Heads in rooms occupied by patients shall be rated at 135 F 6. Pipe friction losses shall be calculated in accordance with Hazen and Williams formula for a "C" value of 120 for new steel wet -pipe systems and a "C" value of 100 for new steel dry-pipe MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS systems. 7 The maximum floor area to be protected by one sprinkler system shall not exceed 52,000 sq ft. 1.5 QUALITY ASSURANCE A. Sprinkler Head Location: The location of sprinkler heads is of critical importance in their relation to lights, diffusers, speakers, etc. and in furnishing a coordinated ceiling pattern of ALL ceiling elements. Contractor shall submit preliminary "reflected ceiling" plan layout of the sprinklered area of the building showing head locations in relation to lights, speakers, grilles, diffusers, etc., for review and the specific approval by the Architect. Additional heads which may be required by the Architect for a coordinated ceiling pattern shall be provided without added cost, even though the number of heads and related piping may exceed the maximum requirements of NFPA 13 B. Shop Drawings: After approval of head locations by the Architect, prepare and submit construction drawings to the state fire marshal and local fire marshal and other local authorities having jurisdiction for approval. Drawings bearing approval of the aforementioned code authorities shall then be submitted to the Architect for his review and approval PRIOR to start of any work. 1.6 REFERENCED STANDARDS A. National Fire Protection Association (NFPA): NFPA 12 Carbon Dioxide Systems. NFPA 13 Standard for the Installation of Sprinkler Systems, 198_ NFPA 14 Standpipe and Hose Systems. NFPA 20 Centrifugal Fire Pumps. NFPA 24 Outside Protection. NFPA 70 National Electrical Code (NEC), Current Edition. NFPA 72A Local Protective Signaling Systems, Current Edition. NFPA 72E Automatic Fire Detectors, Current Edition. B Department of Transportation (DOT) regulations. C. Underwriters Laboratories, Inc. (UL): Fire Protection Equipment List, Current Edition with Quarterly Supplements. D Factory Mutual Laboratories (FM): List of Approved Equipment, Fire Protection Devices and Devices Involving Fire Hazard, Current Edition. E. Comply with requirements of State and City of Port Angles Fire Marshal. 1.7 SUBMITTALS SECTION 15500 PAGE 2 FIRE PROTECTION SYSTEMS A. General: Comply with the requirements of Section 01300, "Submittals," and Section 15010, "General Provisions." B Shop Drawings: Complete sets of shop drawings showing each sprinkler system and hydraulic calculations to show basis for the design shall be prepared by the sprinkler contractor Shop drawings shall be approved by the fire marshals prior to submission to the Architect for approval. f t N 1 i� 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS C. Acceptable Materials and Equipment: Products with UL label or listing in the latest UL "Fire Protection List" and supplement, current at the end of the bidding period, and products with FM label or listing in the "Factory Mutual Approved Guide" are acceptable fire protection materials and equipment. BART 2 PRODUCTS 2.1 BUILDING SPRINKLER SYSTEM MATERIALS 2.2 SPRINKLER HEADS SECTION 15500 PAGE 3 FIRE PROTECTION SYSTEMS A. Water Piping: Piping shall comply with materials listed in Paragraph 3 -1, Chapter 3 of NFPA 13. Pipe and tube used in sprinkler systems shall be designed to withstand a working pressure of not less than 175 psi. B Couplings All Sizes: Class 150 {300 -psi WOG} malleable iron, except high- pressure piping shall be, Class 300. C. Unions 2" and Smaller. Class 150 300 -psi WOG female- screwed malleable iron with ground joint and brass to-iron seat, except for high- pressure piping, use Class 300 unions. D Flanges 2 -1/2" and Up 175 -psi WOG minimum, cast iron screwed; ASTM Al26, Class B and ANSI B16.1, gaskets, ferrous or nickel- based, Grinnell, Garlock, Flexitallic, or approved manufacturer. E. Fittings: 175 -psi WOG minimum, cast iron screwed; ASTM Al26, Class B and ANSI B 16.4 or flanged; ANSI B16.1. F Grooved Couplings and Fittings All Sizes: 1000 -psi WOG minimum, segmental bolted couplings, malleable iron; ASTM A47 500 -psi WOG minimum on system side of pressure- reducing valves. G. Pipe Thread Compounds: Tetrafluoroethylene dispersions and other suitable compounds may be used upon approval; tetrafluoroethylene tape not acceptable. H. Escutcheons: Fastened securely to pipe, chromium plated iron or chromium plated brass, one -piece or split- pattern, held in place by internal spring tension or setscrew; Beaton Cadwell Series 10, Keene No. 102 or No. 105, or approved. I. Pipe Hangers: Hangers shall be in accordance with NFPA 13, and in accordance with requirements of the Underwriters Laboratories, Inc. for use in sprinkler systems. A. General: Standard sprinkler heads with 1/2" orifice shall be used. Sprinkler head temperature ratings shall comply with NFPA 13 -3 -16.6. Heads in rooms occupied by patients shall be 135 °F rating. B Finished Areas: Quick response, glass bulb -type heads in finished areas with suspended ceilings shall be recessed type Reliable "Model F" recessed automatic sprinkler, Grunau recessed sprinkler, Viking recessed pendent automatic sprinkler Head finish shall be chrome plated, ceiling escutcheon ring polished chrome. C. Spares: Spares for each temperature rating of sprinkler head, complete with appropriate storage cabinet and four wrenches, shall be provided. The total number of spare heads shall conform to the requirements of NFPA 13. D Wire Guards: For all heads with clearance height less than 7'-6 factory- fabricated clamp -on guards. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15500 PAGE 4 FIRE PROTECTION SYSTEMS FART 3 WCUTIOIS 3.1 INSTALLATION OF MATERIALS AND EQUIPMENT A. General. Installation of system materials and equipment shall conform to applicable requirements of: 1. Section 15050, "Basic Materials and Methods." 2. NFPA No. 13, "Installation of Sprinkler Systems." 3. The provisions and recommendations of the NFPA constitute mandatory minimum requirements for work specified herein. Strict compliance therewith is required, except all more stringent requirements of the Contract Documents shall modify, supplement, and supersede applicable provisions and recommendations of the NFPA. B. Certification: Provide certificates covering installation and tests for signature by the Architect prior to acceptance of work. C. Experienced Workmen: Fire protection system work shall be supervised and performed by personnel regularly engaged in the installation of fire protection systems conforming to Underwriters Laboratories, Inc. and NFPA standards and closely similar to the work specified and indicated. Submit evidence of qualification of any proposed supervisor or installer. The Architect may reject those who cannot show evidence of such qualifications. D. Welding: Welding will not be permitted except upon specific approval by the State Fire Marshal. When authorization is obtained, welding shall be performed in accordance with the recommendations of NFPA 51B and in accordance with the Code for Pressure Piping ANSI B31.1.0 Power Piping Section with Addenda B31.1.Oa. Sample weld and credentials of qualified welders shall be submitted for approval. E. Piping Supports: Vertical piping supports shall be provided at each floor for risers. F Earthquake Bracing and Earthquake Joints: Comply with Underwriters Laboratories, Inc. requirements and applicable requirements of NFPA 13 G. Piping Through Roof: All pipes through roof shall be flashed with lead flashing H. Piping: All pipe, fittings, valves, equipment, and accessories shall be clean and free of all deleterious material before being installed in their respective systems. Pipe shall be cleaned by hammer, choking, swabbing, and flushing, or by a combination of methods. All lines shall be blown out with compressed air after erection, but blowing out shall not be relied upon for removing foreign matter. During the progress of construction, open ends of pipe, fittings, and valves shall be properly protected at all times to prevent the admission of foreign matter Provide flushing connections at ends of sprinkler cross mains in accordance with requirements of NFPA 13. 1. Drains: The sprinkler system shall be provided with complete drainage facilities as indicated and in accordance with NFPA 13. 2. Protection Against Freezing: Supply pipes or risers that pass through unheated spaces in or under building areas exposed to freezing shall be protected from freezing in accordance with applicable methods in NFPA 13. 3.2 CLEANING A. Cleaning operations during construction and upon completion of the work of this Contract shall be performed in accordance with the applicable requirements of the referenced NFPA standards and the Contract Documents. r I 1 l 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.3 HEAD PROTECTION SECTION 15500 PAGE 5 FIRE PROTECTION SYSTEMS A. Heads shall be protected during painting operations with paper or plastic bags secured over heads as part of the work under this Section. Protection shall be removed immediately upon the finishing of painting operations. 3.4 FIRE PROTECTION WATER SYSTEMS TESTING A. Systems pressure and leak tests shall be conducted in accordance with requirements specified under Section 15990, "Testing, Adjusting, and Balancing." Prior to acceptance of the work, test all completed systems in the presence of the local fire department and fire marshal. Testing and acceptance of sprinkler system shall be in accordance with the requirements of NFPA 13. 3.5 ELECTRICAL REQUIREMENTS A. Electrical components provided as part of the work under this Section shall be connected as part of the work under Division 16. END OF SECTION 15500 1 t 1 t 1 1 1 1 ti 1 i 1 t MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART G 1.1 WORK INCLUDED A. Outdoor condensing units B. Air cooled chillers 1.2 CODES AND STANDARDS A. ARI Standard 240 B. ARI Standard 270 C. City of Seattle/Washington State Non residential Energy Code 1.03 RELATED WORK SECTION 15640 PAGE 1 REFRIGERATION EQUIPMENT A. All portions of specification Division 1 apply to this work. B. All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. gg T 2 PRODUCT 2.1 CONDENSING UNIT (OUTDOOR TYPE, PROPELLER FAN, 6 15 TONS) A. Condensing units are assembled on a heavy -gauge integral steel base. Units are weatherproofed and include hermetic compressors, condenser coils, fans and motors, charging valves, controls and holding charge of refrigerant. Units have a hinged top access panel and removable end panel which allows access to all controls and major components. B Sheet metal casing is 18- gauge, zinc- coated galvanized steel, cleaned, and phosphatized, with exterior surfaces finished with grey /green baked enamel finish over an epoxy resin primer C. Units have two (2) independent refrigeration circuits. Each refrigeration circuit has an integral subcooling circuit with factory- installed refrigerant filter driers. D Units have welded steel shell, hermetic 3,600 RPM compressors, crankcase heaters, internal temperature and current sensitive motor overloads to protect compressor under loss of charge conditions and abnormal operating conditions. E. Units have V -coils mechanically bonded to 3/8 -inch OD seamless copper tubing. All coils are factory pressure and leak tested to 425 psig. Coil guards are optional. F Upflow, direct drive, statically and dynamically balanced propeller fans are used. Permanently lubricated motors have built -in thermal and current overload protection. G. Provide high pressure protection. The units have external control in a lock -out circuit that is reset by switching the thermostat. All units completely factory prewired with necessary controls and terminal blocks for power wiring and 24-volt control wiring. Controls include motor contactors, ambient fan switches and a 24 -volt control transformer Provide compressor sequencing time delay control and MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS B CABINET SECTION 15640 PAGE 2 REFRIGERATION EQUIPMENT anti -short cycle (time delay on restart). H. Condensing units shall be Trane, size and capacity as scheduled, Carrier, or approved substitute. I. Units shall be compatible with respective air handler, see schedules. 2.2 AIR COOLED CHILLER A. GENERAL 1. Air cooled water chiller(s) as scheduled. 2. Total unit shall have dual independent refrigerant circuits for part load standby operation and include a lead -lay switch. 3. The chiller shall be completely factory assembled on a rugged steel channel base and be individually performance tested at full and part load conditions. The unit shall be leak tested and shipped with a full operating charge for Refrigerant 22. 4 Construction and ratings shall be in accordance with latest ARI Standard 590, ANSI/ASHRAE 15 Safety Code, National Electrical Code, CSA and ETL. 1. Unit casing and all structural members shall be fabricated of continuous galvanized steel and galvanized steel channel. Exterior casing shall be phosphatized and painted with a beige urethane finish. C. COMPRESSORS 1. Compressors shall be accessible hermetic reciprocating type with suction and discharge service valves, oil crankcase heater, suction strainer, oil strainer, oil sightglass, and oil charging connection. Compressors shall have a force feed ;lubrication system with reversible oil pump and operating oil change. 2. Compressor motors shall be refrigerant cooled, high torque, hermetic induction type, 1750 rpm with inherent thermal protection in all three phases. Compressors shall be mounted on rubber pads to minimize noise and vibration transmissions. 3 An oil equalization line shall be provided on units employing two compressors per refrigerant circuit. D EVAPORATOR 1. Evaporator shall be direct expansion type with carbon steel barrel, polypropylene water baffles, and high efficiency internally finned through -tubes roll expanded into heavy carbon steel tube sheets. Refrigerant heads shall be removable. 2. The evaporator shall be wrapped" with a heater cable, insulated with 3/4 -inch thick closed cell polyurethane insulation, and painted with a vinyl paint to resist cracking. The heater cable and insulation shall provide freeze protection down to -20 °F ambient air temperature. 3. The evaporator shall be designed, constructed, inspected and stamped in accordance with ASME Code requirements. E. CONDENSER COILS 1. The condenser coils shall be constructed of 3/8 O.D seamless copper tubes mechanically expanded into plate type aluminum fms. The fins shall have full drawn collars to completely cover the copper tube and protect against atmospheric corrosion. i 1 T t 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15640 PAGE 3 REFRIGERATION EQUIPMENT 2. A subcooling coil shall be an integral part of the main condenser coil 3. Nominal temperature difference between refrigerant condensing temperature and ambient air temperature shall be 30°F F CONDENSER FANS AND MOTORS 1. Condenser fans shall be propeller type arranged for vertical air discharge and shall be individually driven by direct drive fan motors. Fan glades shall be steel with a black paint finish or unpainted aluminum. Each fan shall be protected by a heavy -gauge fan guard. Condenser fan motors shall be 3- phase, direct drive, 1140 rpm, open drip proof type positioned within the unit cabinet for weather protection. G. CONTROLS 1. Field power connection, control interlock terminals and unit control system shall be centrally located in a weather -proof enclosure. Panel access doors shall key lock and included steel rod door Panel shall be dead front type 2. Power and starting components shall include factory fusing of fan motors and control circuit, starting contactors including individual contactors for each fan motor, solid -state compressor sequence start timers, solid -state compressor overload protection in all three phases, inherent condenser fan motor overload protection, and unit power terminal block(s) for field connection to remote disconnect switch(es). 3. Safety and operating controls shall include unit control stop switch, recycling pumpdown control, manual pumpdown switch, compressor lead -lag switch, oil safety switches, high and low pressure switches, water temperature controller, freeze protection pressurestats, and fan cycling controls. 4 Terminals shall be provided for field connection of a 115 volt power supply to the control circuit and evaporator heater circuit. During part load operation, the unit's refrigerant circuits shall be alternately unloaded in steps as scheduled. Unit controls shall provide recycling pumpdown protection at all times, including time clock system shutdowns on nights and weekends. H. LOW AND HIGH AMBIENT OPERATION 1 Units shall be provide with automatic head pressure control to permit satisfactory operation at ambient air temperatures down to 10 °F by cycling condenser fans in response to refrigerant head pressure and ambient air temperature. 2. Unit shall be rated for operation at ambient air temperatures to 120 °F I. REFRIGERANT PIPING 1. Dual refrigerant circuits shall be completely independent of each other and include hot gas mufflers, a factory insulated suctionline, manual liquid line shutoff valve with charging connection, refrigerant filter- drier, liquid sightglass/moisture indicator, liquid line solenoid valve, thermal expansion valve, purge valves, and 450 prig relief valve. J MICROTECH CONTROLLER 1 The microprocessor based control system shall stage unit based on the leaving water temperature. Safeties controlled by the microprocessor include oil differential pressure and motor protection for each compressor, high pressure for each refrigerant circuit, loss of charge, loss of water flow freeze protection, and low refrigerant pressure. 2. Leaving water temperature sensor shall be factory installed. Controls shall include auto /stop switch, leaving water temperature setpoint adjustment, anti- recycle function, digital display and MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15640 PAGE 4 REFRIGERATION EQUIPMENT the ability to accept phase loss, phase reversal, under and over voltage signal. Display readouts include water temperature setpoints, operating temperatures, and diagnostic messages. 3. The microprocessor shall have the ability to display refrigerant pressures and percent unit amp draw K. ACCESSORIES 1. Control Circuit Transformer Factory installed and wired between the line voltage power terminal block and the 115 volt control circuit. 2. Part Winding Start Shall work in conjunction with the unit's standard compressor sequence start timers to reduce current in -rush by providing two -step starting of each compressor. 3 Hot Gas Bypass Permits unit operation down to 10% of full load capacity and includes a hot gas bypass valve, solenoid valve, and manual shutoff valve. Shall be provided on both refrigerant circuits with the standard lead -lag switch provided. 4. Gauges Factory mounted gauges include high side and low side refrigerant gauges per refrigerant circuit and oil pressure gauges per compressor 5. Protective Coil Guards Factory installed coil guards provide all- around fin protection on ground level installations. 6. Condenser coils Shall be dipped in heresite, a corrosion inhibitor suitable for salt air and pulp mill fume environment. 7 Disconnect Switch Provide factory installed non -fused disconnect switch with single point power supply The switch shall be properly sized for model and voltage required. 8. Circuit Breakers Factory installed and available with single point power supply Provides unit installed compressor short circuit protection. 9 Indicator Light Package Factory installed diagnostic indicator lights which illuminate upon a safety fault, as well as lights displaying power on and compressor staging. Each safety has an individually labeled light. 10. Water Flow Switch Field installation in the chilled water piping to prevent evaporator freeze up under low or no flow conditions. Terminals are provided in the unit control center for field hook -up of the water flow safety switch. 11. Vibration Isolators Provide and field install to reduce vibration transmission through the unit base. 12. Cycle Counter Run Hour Meter Factory installed for each compressor to monitor the number of times each compressor has started and how long it has run. L. MANUFACTURER 1 Unit shall be size, capacity and arrangement as indicate on the drawings. 2. Unit shall be McQuay Series ALR (SEASONPAK), or equal of Trane, or York or Dunham- Bush. END OF SECTION 15640 f j i 1 1 1 i 1 1 i 1 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS SECTION 15650 PAGE 1 LIQUID HEAT TRANSFER SYSTEMS PART GENERAL 1.1 WORK INCLUDED A. Pumps B. Piping specialties C. Coils D Duct coils 1.2 CODES AND STANDARDS A. See Section 01091, Reference Standards. 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B. All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. PART 2 PRODUCT 2.1 HEATING AND CHILLED WATER A. Pumps: 1. Base mounted pumps centrifugal, single stage, vertical in -line, motor driven type, bronze fitted, with mechanical seals (-40 degrees F to +225 degrees F). Pumps shall be Bell Gossett, type, size and capacities as scheduled on the drawings, Armstrong, Paco, Dunham -Bush, or approved substitute. 2. In -line pumps centrifugal, single stage, vertical split case, motor driven type bronze fitted, or all bronze if so scheduled, with mechanical seals +32 degrees F to +225 degrees F). Pumps shall be Bell Gossett, type, size and capacity as scheduled on the drawings, Armstrong, Dunham Bush, Taco, or approved substitute. 3. Install pumps on a 4-inch-high concrete base with anchor bolts. Level the pump base with metal wedges under the base plate on base- mounted pumps. Grout the base plate in position after the pump and motor shaft is aligned. B Piping Specialties: 1. Flow meters shall be Aeroquip Barco Company venturi tube flow fittings, selected and installed as recommended by manufacturer Fittings shall be for minimum pressure drop at specified flow rates. Install in piping where shown on the drawings. 2. Provide strainers where indicated on the drawings. Strainers shall be wye type with brass perforated strainer baskets with holes 1/16 -inch in diameter and at a ratio of free area through screen to pipe not less than 3 to 1, threaded or flanged to suit piping non -shock pressure temperature rating of 250 psig at 450 degrees F Provide a gate valve blow down with cap on outlet. Strainers shall be Armstrong "Y" series, Fisher, Walworth, Bailey, Sarco, or approved MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15650 PAGE 2 LIQUID HEAT TRANSFER SYSTEMS substitute. 3. Pressure gauges shall be as specified in Section 15060 Install pressure gauges to indicate pressure at each pump inlet and outlet, on each side of differential pressure control valves and on each side of flow control valves. 4. Thermometers shall be as specified in Section 15060. Thermometers shall be installed at outlets of circulating pumps, all sides of control valves, balancing valves, and at inlet and outlet of each heating coil. 5. Provide suction diffusers on inlets of all base mounted and close coupled pumps, Bell Gossett, Armstrong, Taco, or approved substitute. 6. Provide triple duty valves on outlets of pumps, Bell Gossett, Armstrong, or approved substitute. Configuration to suit piping arrangement. 7 Compression tank shall be ASME labeled, 125 psig working pressure at 375 degrees F, with gauge glass, tank fitting and drain fitting. Bell Gossett, size as scheduled on drawings, Armstrong, Dunham -Bush, National, Taco, or approved substitute. 8. Air Vents: a. Provide air vents at all system high points. b. Air vents shall be as noted on drawings: 1) Manual type. 2) Automatic type Hoffman #79 maximum temperature +250 degrees F, maximum operating pressure 75 psig. Pipe 1/8 -inch drain pipe from vent to nearest floor drain, or as directed by Engineer. C. Coils: 1. Coils must be rated, tested and certified in accordance with ARI Standard #410. 2. Fins shall be 0.008 -thick aluminum, mechanically bonded to tubes. 3 Tubes shall be 5/8 -inch diameter by 0.024 seamless copper, staggered in direction of air flow 4 Headers shall be seamless copper or gray cast iron (direct expansion coils shall not have gray cast iron headers). 5 Water coils shall have vent and drain connections and have steel MPT connections on water coils. 6. Coil casings shall be minimum 16 gauge galvanized steel, with 1 -1/2 -inch flanges with 3/8 -inch diameter holes at 3 -inch centers. Coils 60- inches in length up to 96- inches in length shall have one galvanized steel center support. Coils over 96- inches in length shall have two intermediate supports. 7 Direct expansion refrigerant coils shall have two distributors installed for dual circuits. Coil connection shall be male sweat nonferrous. 8. Coil type shall be Serpentine cleanable and drainable. 9 Where shown on the drawings, provide eliminator assemblies installed downstream from the cooling coils. Eliminators shall have 4 -bend blades and be constructed with 24 gauge galvanized steel blades and 10 gauge painted black steel frames. Eliminator assemblies shall be Air and Refrigeration Corp. #4B, or approved substitute. 10. Provide drip pan with 1 1/4 -inch drain connection under cooling coils, as detailed on drawings and extended downstream to catch condensate carry-over and under headers. Drip pan to be sloped toward drain connection, double constructed with 1- inch -thick fiberglass insulation to 1 1 7 J 1 1 1 1 1 1 1 1 1 t 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS SECTION 15650 PAGE 3 LIQUID HEAT TRANSFER SYSTEMS insure the elimination of condensation under drip pans. For multiple tiered coils with total height over 24-inch, provide multiple drip pans, one under each tier. Extend 1 112 -inch minimum diameter down comer leader at one end of pan. 11. Air handler, chilled water and direct expansion coils shall be dipped in Heresite, a corrosion inhibitor suitable for salt air and pulp mill fume environment. 12. Coil capacities, sizes, rows and fin spacing shall be as scheduled on the drawings. 13 Coils shall be as manufactured by Trane, Pace -Brod McClung, Carrier Bohn, Dunham -Bush, Airtherm, or approved substitute. 2.2 HEATING WATER EQUIPMENT A. Duct Coils: 1. Single duct, rectangular inlet manual balancing hot water heating coil, size and capacities as scheduled on drawings. Provide unit with internal insulation and opposed blade damper 2. Casing shall be 20 gauge galvanized steel, header plate shall be 16 gauge galvanized steel, fins shall be .006 -inch aluminum, rippled, maximum. 10 per inch. 3 Tubes shall be 112 -inch OD copper with .016 -inch wall thickness mechanically expanded to fins. 4 Header tubes shall be extended 3- inches for field sweat connection. 5. Coil shall be tested leak free at 315 psig air pressure under warm water containing wetting agent. 6. Coil shall be Titus, or approved substitute. gART 3 EXECUTION 3.1 WATER SYSTEMS A. Piping Installation: 1 Weld all piping which is in trenches, direct buried or buried in sealed conduit. At the contractor's option, piping 2- inches and smaller may be welded. 2. Run piping level. 3 Install drain valves at all low points. 4 Install air vents at all high points and as detailed on the drawings. 5 Test all heating piping at 125 psi hydrostatic test. Repair all leaks by remaking the joint and repeat the test. 6. After installation is complete, thoroughly flush and clean entire system. END OF SECTION 15650 1 r 1 t 1 t 1 t y t i r MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART GENERAL 1.1 WORK INCLUDED SECTION 15660 PAGE 1 STEAM SYSTEMS A. Traps B Strainers C. Specialties D Pressure reducing valves E. Pressure relief valves F Condensate return pump G. Convertors H. Steam humidifiers 1.2 CODES AND STANDARDS A. Conform to Section 01091, Reference Standards 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. PART 2 PRODUCT 2.1 STEAM A. Steam Traps: 1. Traps for low and medium pressure steam piping shall be float and thermostatic traps, Armstrong B series, 175 psig vessel design limitation, or Dunham -Bush, Hoffman, Sarco, or approved substitute. Capacities shown on the drawings are based on a continuous rating of 1/2 psi differential across the trap unless otherwise indicated. B Strainers: 1. Body construction shall be such that air is not trapped in the strainer. 2. Strainer baskets shall be perforated stainless steel, with holes 1/16 -inch in diameter and a ratio of free area through screen to pipe not less than 3 to 1. 3. Strainers shall be 125 psig w.s.p. for low and medium pressure systems; 250 psi w.s.p. for high pressure systems. 4 Strainers shall be Armstrong "Y" series, Fisher, Walworth, Bailey, Sarco, or approved substitute. C. Specialties: MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15660 PAGE 2 STEAM SYSTEMS 1. Vacuum Breakers shall be 3 /4-inch body rated for 125 psig steam service. Hoffman model #62, or approved equal of Spirax/Sarco or Armstrong. 2. Air Vents shall be 1t2 -inch stainless steel thermostatic bellows type, rated steam service. Armstrong TV 2 for up to 125 psig steam, TTF -1R for 300 psig, or approved equal of Spirax/Sarco or Hoffman. 3. Steam Control Valves: a. Valves shall be pneumatic actuated, single port, globe style, flanged cast iron body, 250 pound rating, ANSI/ASME B 16.1. b. Valves 2 -inch and larger shall be cage guided, balanced valve plug, Fisher ED, or approved equal. Valves 1 -1/2 -inch and smaller shall be post- guided, Fisher EZ, or approved equal. D. Pressure Reducing Valves: 1. Valves shall be pilot operated type, Fisher type 92B, 2 to 150 psig operating range, sizes and capacities as scheduled on the drawings. 2. Springs shall be 17-4 PH stainless steel. E. Pressure Relief Valves: 1. Consolidated series 1511, cast iron body, ASME, 250 psi maximum pressure, or Crosby, Lonergan, Kunkel, or approved substitute. 2. Discharge elbow and drip pan unit shall be Consolidated No. 1665 or 1666. F Condensate Return Pump: 1. Duplex motor driven, with two vertical shaft centrifugal pumps mounted on a single cast iron receiver Sight glass on receiver, dripproof motor, and float in receiver with NEMA switch mechanism mounted on the receiver cover 2. NEMA control panel, UL listed with hand off -auto magnetic starter, fused disconnect switches, overload and underload protection, electric alternator, lead -lag selector switch, pilot lights and alarm bell. Provide control transformer when power supply exceeds 120 volts. Panel, pumps and switches shall be all factory- mounted and wired. 3. Manufacturer shall be Domestic Pump and Manufacturing Co. Chicago Pump Company "Sure Return" Hoffman, Weil Pump Co., Dunham -Bush; Pacific Pumping Co. Federal Pump Co. Skidmore; or approved substitute. Size and capacities as scheduled on drawings. G. Convertors: 1. Multi-pass, shell and tube "U" bend, for use with steam in the shell, water in the tubes; constructed with 3 4 -inch #18 BWG copper tubes, steel shell, steel tube sheets and supports, an cast iron divided head. Provide vacuum breaker on shell, Hoffman #62. 2. Convertor shall be ASME stamped pressure vessel for 20 psig shell and 2.0 psig head at maximum 300 degrees F Submit manufacturer's data on ASME form. 3. Select convertor using a fouling factor of 0.0005 steam side, 0.001 water side, or as indicated otherwise on the drawings. 4 Size and capacity as indicated on the drawings, Bell Gossett type "SU Patterson -Kelly, Armstrong, Taco, or approved substitute. 1 1 l 1 1 1 1 1 i 1 I 1 i r t t 1 t r 1 1 f 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS FART 3 EXECUTION 3.1 PIPING A. Low Pressure (0 -15 psig) and Medium Pressure (15 -125 psig) Piping Installation: r 1. Pitch mains down in direction of steam flow 1 -inch to 40 -feet; pitch smaller branches and runouts, 1 -inch to 10 -feet. 2. I'Srain ends of mains and each low point in the piping through a float and thermostatic trap of adequate size. Pipe into return system. 3. Provide eccentric reducer at each point where horizontal steam mains are reduced in size. Locate reducers 3 -feet beyond the branch where the mains change size. 4 Test all low pressure piping at a hydrostatic pressure of 75 psi, 125 for medium pressure, for a minimum of 4- hours. 5 Return piping, fittings, pitch and testing shall be the same as steam piping. 3.2 STRAINERS B 3.3 A. 3.4 A. SECTION 15660 PAGE 3 STEAM SYSTEMS A. Provide strainers ahead of steam control valves, pressure reducing valves and all steam traps except those which are installed closely downstream from a control valve. Strainers shall be the same size as the line size. Provide a gate valve blow down with cap on outlet. PRESSURE REDUCING VALVES Install as shown on drawings, and with pressure gauges on inlet and outlet side of valve. PRESSURE RELIEF VALVES: Run valve discharge through the roof. The pipe above the roof shall be galvanized. Provide flashing and counterflashing where it passes through the roof. B Provide a discharge elbow and drip pan unit at each relief valve, same size as the relief valve outlet, Consolidated No. 1665 or 1666, or approved equal. Pipe drains to a floor drain. 3.5 CONDENSATE RETURN PUMPS A. Mount on 4- inch -high concrete pad. END OF SECTION 15660 1 y t 1 1 t 1 1 1 r MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAINISURGERY ADDITIONS ALTERATIONS L(RT 1 GENERAL 1.1 WORK INCLUDED A. Air Handling Units B. Packaged Air Conditioning Units C. Roof Exhaust Fans D Utility Sets E. In -line, Wall and Cabinet Fans F Humidifiers SECTION 15700 PAGE 1 AIR HANDLING EQUIPMENT 1.2 CODES AND STANDARDS A. Air handling units shall conform to the ArvICA Standards Handbook Publication No. 99 B Vibration isolation of air handling units shall conform to the criteria set in the I.A.W 1980 ASHRAE Systems Guide, Chapter 35, Table 26 Equipment Vibration Criteria. C. Electrical panels shall be in accordance with the NEMA standards. D Packaged air conditioning units shall be UL listed, labeled and rated in accordance with A.R.I. Standards. E. All units shall meet Washington Sate Energy Code performance requirements. F Fan performance shall be per AMCA standard 210. G. Fan noise limit tests shall be in accordance with AMCA Standard 300 "Test Code for Sound Ratings' H. Fan drive guards shall be per WAC 296 -24205 "General Safety and Health Standards' State of Washington Department of Labor and Industries. 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications indexL PART IRODUCT 2.1 ROOFTOP MR HANDLING UNIT A. General: 1. Unit completely factory- assembled, wired and tested. 2. The air handling unit, and the fans used therein, must conform to the standards, as applicable, MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDPIIONS ALTERATIONS SECTION 15700 PAGE 2 AIR HANDLING EQUIPMENT set forth in the AMCA Standards Handbook (Publication No. 99), and bear the AMCA Seal. B. Casing Construction: 1. Roof curb construction full perimeter design, fabricated from minimum 12 -gauge galvanized steel. Minimum curb height 12- inches with cross bracing at each section joint. Match curb to slope of roof for level mounting of unit. 2. Constntct cabinets from galvanized steel with a minimum thickness of 16 -gauge for the steel panels. Adequately reinforce panels for the maximum anticipated static pressures involved. Bolt panel joints on close centers and caulk to insure the air- tightness of the cabinet. Factory- applied enamel paint finish coat. Construct base of units of structural steel channels and angles. 3. Insulate the interior of cabinet sections with a minimum of 3 -inch thick, 1.5 -pound density fiberglass insulation applied with adhesive and mechanical fasteners 12- inches on centers. Raw edges of the insulation exposed to the airflow, coat to prevent airflow erosion. 4 Access doors double construction, 20 -gauge galvanized steel door liners, extruded aluminum frames, seal to vinyl dual durometer gasketing, heavy duty hinge, solid locking lever latching mechanism with cylinder locks all keyed similar. Each door shall have vision panel to view cabinet interior. Provide locking type door restrainers. Provide door on both sides of unit, full unit height at fans, filters, coils and electrical sections. 5. Louvers, storm -proof design and provided with 1t2 -inch by 1/2 -inch mesh bird screen. 6. Ducts, wiring, conduit and piping entrance into unit through the roof within the curb enclosure. 7 Provide stainless steel waterproof and insulated drain pan under cooling coil section with drain pipe to exterior of unit. C. Fan Sections: 1. Fans type, size and capacity as scheduled on the drawings. AMCA rated. Size the shafting of the fan not to exceed 75- percent of the first critical speed under the specified operating conditions and the lateral static deflection of the shaft not to exceed 0.003 inches per foot of the length of the shaft. In larger sizes, shafting will be hollow to lessen the weight of the rotating parts and insure longer bearing life. 2. Statically and dynamically balance the fan wheel and shaft assembly prior to assembly Following assembly test the fan balance using an electronic balance analyzer with tunable filter and stroboscope. Take vibration measurements on each bearing housing in two (2) radial and one (1) axial direction in relation to shaft centerline. Use I.A.W 1980 ASHRAE Systems Guide, Chapter 35, Table 26 Equipment Vibration Criteria, acceptance/reject criteria. Vibration test the fan assembly at design RPM with the tunable filter utilized and scan frequencies from 500 cycles per minute to 50,000 CPM to detect misalignment, bearing defects, mechanical looseness, or foundation weakness. 3. Single and twin airfoil fans for variable volume systems with conical inlet vanes with linkage for operation by a single operator. Inlet vanes not to cause reduction in volume or increase in horsepower, in the full open position. 4 Mount fan and motor internally in the fan cabinet on an integral base. Isolate this assembly from the cabinet by freestanding, unhoused, stable steel springs with leveling bolts with isolation efficiency in accordance with Section 15020, Vibration Isolation. Isolate the fan outlet from the cabinet by means of neoprene coated flexible connection. Install springs in such a manner that a neoprene, or fiberglass, high frequency absorber is used and no continuous metal to-metal contact is present between the fan integral base and the base of the fan cabinet. Provide vibration isolation base with earthquake restraints to restrain fan assembly in vertical and horizontal direction. Electrically ground the rotating assembly through the motor wiring. Wire MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15700 PAGE 3 AIR HANDLING EQUIPMENT the fan motor with a flexible conduit of adequate length so that it will not affect the vibration isolation. Mount the fan cabinet a s rigidly as possible in order not to impair the efficiency of the spring isolation of the fan and motor. The maximum allowable velocity in the vertical direction on top of the bearings is 0.075 inches per second as compared to the base on which the fan and motor are mounted. 5. V -belt type drives with cast iron sheave. Motor sheaves adjustable- pitched diameter -type. Select drives so that drive horsepower is equal to at least 150- percent of motor nameplate horsepower Drives selected oth in accord with manufacturer's recommendations. Motors over 2 -HP provide multi-belt drives. 6. Motors standard NEMA frame. Fractional horsepower motors resilient mounted. Integer horsepower motors ball bearing, rigid mounted. Motors open- dripproof construction. Heavy steel motor adjusting bases to be aupplied. Motor speeds not to exceed 1750 -RPM. 7 Pillowblock ball bearings selected for life of 100,000 -hours on forward -curved units and 50,000 hours on backward inclined and airfoil units. Pressure lubricated ball-type bearings, provide with safety pressure relief grease fittings. Extend grease fittings to accessible position. Structural channels bearing supports of sufficient size and strength to insure flat bearing mounting surface and proper structural support. Additional support above 30- inches wheel diameter will be required and bearing supports above Size 11 must be bolted construction for ease of wheel removal. Welding of bearing supports is not acceptable. D Mixing Box Dampers: 1. Construct mixing box dampers of extruded aluminum blades. Provide blades with extruded vinyl or rubber edge seals. Seal, blade ends with aluminum "arc" seals. Construct the external frame of heavy gauge welded steel with 1 /4-inch plate bearing bars and bronze or turcite insert bearing. Arrange linkage externally for parallel or opposed -blade action. Barometric dampers not permitted. 2. Damper leak rate not to exceed 11 -CFM per square foot of damper at 2 1/2- inches W.G. pressure. E. Economizer Section: 1 Economizer section includes dampers for return air and dampers and louvers for outside air and discharge in a "Z" configuration. 2. Louver and damper sizing: a. Outside air: 500 to 600 fpm range. b. Discharge air 600 to 700 fpm range. c. Return air 1000 to 1200 fpm range. 3 Damper construction as described for mixing box damper above. Barometric dampers or louvers not permitted. F Filter Section: Provide filters and Magnehelic gauge in filter section in accordance with Section 15850, and as scheduled on the drawings. Provide weatherproof enclosure for exposed portions of Magnehelic gauge. G. Electric Control Center and Wiring: 1. Each unit will contain an electrical control center consisting of: a. An externally mounted NEMA 3R main power disconnect (vandal- proof). MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15700 PAGE 4 AIR HANDLING EQUIPMENT 'b. An internally mounted NEMA 1 enclosure with fused motor starters with H.O.A. switch and 3 -phase overload protection for supply and return fan motors, control transformer for primary voltage to 1201/60 Hz, and system control terminal strip. 2. Each unit completely factory- wired, requiring only field wiring of power wiring to the main power disconnect and one separate source 120 /60/1 power with disconnect switch (vandal proof) for receptacles and light fixtures. Switches shall be vandal- proof. 3. Provide vapor service light in each fan, filter, and coil compartment; wire to a single switch. Provide duplex GF -I receptacle adjacent to electrical control center. Lights and receptacle factory-wired to separate junction box. H. Controls: 1. Will be provided under Section 15900 and as indicated on the drawings. I. Cooling Coils: Provide DX or chilled water cooling coils as scheduled and specified in Section 15650. J. Unit size, capacity and arrangement as scheduled and shown on the drawings, Haakon, Pace Company, or approved substitute. 2.2 AIR HANDLING UNIT (INDOOR TYPE) A. General: 1. Unit completely factory- assembled and tested. 2. The air handling unit, and the fans used therein, must conform to the standards, as applicable, set forth in the AMCA Standards Handbook (Publication No. 99) and bear the AMCA Seal. B Casing Construction: 1. Construct cabinets from galvanized steel with a minimum thickness of 16 -gauge for the steel panels. Adequately reinforce panels for the maximum anticipated static pressures involved. Bolt on panel joints on close centers and caulk to insure the air- tightness of the cabinet. Factory- applied enamel paint finish coat. Construct base of units of structural steel channels and angles. 2. Insulate the interior of cabinet sections with a minimum of 2 inch thick, 1.5 pound density fiberglass insulation applied with adhesive and mechanical fasteners 12- inches on centers. Raw edges of the insulation exposed to the airflow coat to prevent airflow erosion. 3 Access doors double construction, 20 -gauge galvanized steel door liners, extruded aluminum frames, seal to vinyl dual durometer gasketing, heavy -duty hinge, solid locking lever latching mechanism. Provide locking type door restrainers. Provide door on both sides of unit, full unit height at fans, filters, and coil sections. 4 Provide stainless steel waterproof and insulated drain pan under cooling coil section with drain pipe to exterior of unit. C. Fan Sections: 1. Fans type, size and capacity as scheduled on the drawings. AMCA rated. Size the shafting of the fan not to exceed 75- percent of the first critical speed under the specified operating conditions and the lateral static deflection of the shaft not to exceed 0.003 inches per foot of the length of the shaft. In larger sizes, shafting will be hollow to lessen the weight of the rotating parts and insure longer bearing life. 2. Statically and dynamically balance the fan wheel and shaft assembly prior to assembly Following assembly, test the fan balance using an electronic balance analyzer with tunable filter MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15700 PAGE 5 AIR HANDLING EQUIPMENT and stroboscope. Take vibration measurements on each bearing housing in two (2) radial and one (1) axial direction in relation to shaft centerline. Use I.A.W 1980 ASHRAE Systems Guide, Chapter 35, Table 26 "Equipment Vibration Criteria acceptance/reject criteria. Vibration test the fan assembly at design RPM with the tunable filter utilized and scan frequencies from 500 cycles per minute to 50,000 CPM to detect misalignment, bearing defects, mechanical looseness, or foundation weakness. 3. Single and twin airfoil fans for variable volume systems with conical inlet vanes with linkage for operation by a single operator. Inlet vanes not to cause reduction in volume or increase in horse power, in the full open position. 4 Mount fan and motor internally i n the fan cabinet on an integral base. Isolate this assembly from the cabinet by free standing, unhoused, stable steel springs, leveling bolts, with isolation efficiency in accordance with Section 15020, Vibration Isolation. Isolate the fan outlet from the cabinet by means of a neoprene coated flexible connection. Install springs in such a manner that a neoprene, or fiberglass, high- frequency absorber is used and no continuous metal- to-metal contact is present between the fan integral base and the base of the fan cabinet. Provide vibration isolation base with earthquake restraints to restrain fan assembly in vertical and horizontal direction. Electrically ground the rotating assembly through the motor wiring. Wire the fan motor with a flexible conduit of adequate length so that it will not affect the vibration isolation. Mount the fan cabinet as rigidly as possible in order not to impair the efficiency of the spring isolation of the fan and motor The maximum allowable velocity in the vertical direction on top of the bearings is 0. 075 inches per second as compared to the base on which the fan and motor are mounted. 5 V -belt type drives with cast iron sheave. Motor sheaves adjustable- pitched diameter -type. Select drives so that drive hors is equal to at least 150- percent of motor nameplate horsepower. Drives selected othe in accord with manufacturer's recommendations. Motors over 2 -HP provide multi-belt drives. 6. Motors standard NEMA frame. Fractional horsepower motors resilient mounted. Integer horsepower motors ball bearing, rigid mounted. Motors open- dripproof construction. Heavy steel motor adjusting bases to be supplied. Motor speeds not to exceed 1750 RPM. 7 Pillowblock ball bearings selected for life of 100,000 -hours on forward -curved units and 50,000 hours on backward- inclined and airfoil units. Pressure- lubricated ball-type bearings, provide with safety pressure relief grea fittings. Extend grease fittings to accessible position. Structural channels bearing supports of sufficient size and strength to insure flat bearing mounting surface and proper structural support. Additional support above 30- inches wheel diameter will be required and bearing supports above Size 11 must be bolted construction for ease of wheel removal. Welding of bearing supports not acceptable. D Mixing Box: 1. Construct mixing dampers of extruded aluminum blades. Provide blades with extruded vinyl or rubber edge seals. Seal blade ends with aluminum "arc" seals. Construct the external frame of heavy gauge welded steel with 1 /4-inch plate bearing bars and bronze or turcite insert bearing. Arrange linkage externally for parallel or opposed -blade action. 2. Damper leak rate not to exceed 11 CFM per square foot of damper at 2 -1/2- inches W.G. pressure. 3. Filters: See filter section below E. Filter Section: Provide filters and Magnehelic gauge in filter section in accordance with Section 15850, and as scheduled on the drawings. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.4 CENTRIFUGAL ROOF EXHAUSTERS SECTION 15700 PAGE 6 AIR HANDLING EQUIPMENT F Cooling Coils: Provide chilled water cooling coils as specified in Section 15650. G. Unit size, capacity and arrangement as scheduled and shown on the drawings, Haakon, Pace Company, or approved substitute. 2.3 CENTRIFUGAL FANS A. Backward inclined airfoil, constant volume, AMCA certified, in accordance with Standard #210. Arrangements, discharges, and accessories as scheduled on the drawings. Fans constructed of low carbon steel and painted with a corrosion resistant coating. B. Wheels and Housings: The wheel diameters and discharge areas in accordance with the standard sizes adopted by AMCA for non overloading fans. Inlets fully streamlined and housings suitably braced to prevent vibration or pulsation. Housings constructed of heavy gauge steel and continuously welded throughout. Standard coating durable and heat resistant up to 500°F C. Shaft and Bearings: The first critical shaft speed of Class I or II fans at least 125- percent of the fan's maximum operating speed. The first critical speed of Class III and IV fans at least 142% of the fan's maximum operating speed. Bearings designed for heavy -duty service with a minimum L[10] life 20,000 hours. Bearing ratings are based on the fan's maximum cataloged operating speed. Bearings either single -row ball or double -row spherical roller type in a one -piece cast iron housing, or a double row spherical roller type in a split cast iron pillow block. Bearings rigidly supported on heavy structural supports. D Performance. Fan performance based on tests conducted in accordance with AMCA Standard Test Code for Air Moving Devices. All fans licensed to bear the AMCA Certified Rating Seal. Fans shall have a sharply rising pressure characteristic extending through the operating range and continuing to rise well beyond the efficiency peak to assure quiet and stable operation under all conditions. Horsepower characteristics truly non overloading and reach a peak in the normal selection area. Fan manufacturer provide sound power ratings in the eight octave bands based on AMCA Standard 300 -67 test set -up number 1. Sound power ratings shall be in decibels referenced 10 12} watts. E. Balancing: Provide factory dynamic balance on all fans after their assembly Use an IRD or PMC analyzer to measure velocity, and the fmal reading not to exceed 0.1- inches per second. Record the exact level of vibration on the fan as proof of the final dynamic balance at the factory F Miscellaneous: 1. Full belt drive with belt guards. All fans over 2 -HP motors provide with multi -belt drive; all sheaves shall be adjustable. 2. Provide vibration isolation mounts and steel fan and motor support base in accordance with Section 15020, Vibration Isolation. G. Fan Pace-Brod- McClung, size and capacity as scheduled on drawings, Trane, Peerless, Barry Blower, Champion, or approved substitute. A. General: Provide the belt- driven or direct -drive centrifugal -type roof exhaust fans where shown on the drawings; size, and capacity as indicated. B Construction: Housinm heavy -gauge aluminum. The unit base shall form a curb cap. C. Fan Wheel. Centrifugal, precision balanced, aluminum, nonsparking, with nonoverloading backward- 1 i 1 f 1 1 1 1 1 1 1 1 r r MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15700 PAGE 7 AIR HANDLING EQUIPMENT inclined blades. The roof exhauster shall have overlapped wheel and orifice combinations. D Motors: Ball bearing, standard NEMA design; motor isolated from the air stream, electrical connector to facilitate wiring to power supply; slotted motor base for adjusting; variable pitch pulley E. Accessories: Roof exhauster shall include factory- furnished sound attenuated roof curb, curb gaskets, automatic backdraft dampers, disconnect switch and bird screen. For direct -drive fans, provide speed controllers. 2.5 UTILITY SETS A. Forward -curve airfoil, AMCA certified, Class 1, full belt guard, adjustable sheave and vibration isolation springs in accordance with Section 15020, Vibration Isolation. B. All sheetmetal parts and frames factory enamel finish. C. 2 -HP motors and larger provide multi-belt drives. Accessories as scheduled on the drawings. D Bearings designed for minimum L[10] life 40,000- hours. E. Fan Pace Co., arrangement, discharge, size, and capacity as scheduled on the drawings, Trane Co. Penn, Barry Blower, Acme, Twin City a, i i pion, or approved substitute. 2.6 WALL FANS A. Open centrifugal wheel -type fan, all aluminum construction, airfoil blades resilient mounted motors direct drive, AMCA certified. B. Provide bird screen, backdraft damper and solid -state speed control switch. C. Fan Acme "CentriMaster" size and capacity as scheduled on drawings, Loren Cook, Carnes, Jenn- Aire, Penn, or approved substitute. 2.7 HUMIDIFIERS A. Steam. 1 Electric modulating control, steam separator type with integral steam jacket control valve, internal steam jacketed drying chamber, silencing chamber, and steam jacketed distribution manifold. 2. Provide integral operator electric, distribution manifold, "Y" strainer and inverted bucket trap. 3 Unit as manufactured by Armstrong, size and capacity as scheduled on drawings, Dri- steem, Sarco, or approved substitute. B Self Contained Steam Generating Type: 1. Self contained, all electric steam generating humidification system of the size shown on the plans. Steam generated by boiling off tap water in a steam generator cylinder. Generator cylinder to include electrodes. Tap water in generator cylinder acts as the conductor Disposable generator cylinder and electrodes. Steam distributor pipe mounted as shown. Mineral deposits either drain away or trap in disposable steam generator cylinder. Humidification system includes electronically controlled drain cycle to periodically drain away mineral sludge. 2. Humidification system completely pre piped, requiring the following non electrical connections: MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15700 PAGE 8 AIR HANDLING EQUIPMENT a. Connect tap water to cabinet. b. Connect drain to cabinet. c. Connect length of steam hose or pipe between cabinet and steam distributor pipe. d. Connect condensate return line between steam distributor pipe and cabinet. 3. Humidification system shall include the following for field mounting: a. Steam distributor pipe for each steam generator circuit. b. Steam hose. c. Condensate return line. d. Air gap drain fitting. 4. Electrical construction: a. Humidification system completely prewired and include built -in transformer to provide 24- volt supply for electrical control circuit. b. Humidification systems includes integral secondary magne tic overload protection. c. Humidification systems includes a door interlock to disconnect power to steam cylinders when cabinet door is opened. d. Steam output rate meter calibrate in pounds of steam per hour The following field electrical connections are required: 1) Power wiring from external disconnect or circuit breaker to cabinet. 2) Grounding wire from cabinet to ground. 3) Control wiring (24 volt from humidistat to terminal strip in cabinet). 5 Cabinet: a. Cabinet constructed of 18 -gauge galvanized steel, phosphatized and with gray enamel finish. b. Provide cabinet with lock and key for door c. Steam output rate meter and indicator lights for steam generator circuit to be visible when cabinet door is closed and locked. 6. Controls: Provide the following control components: a. Room humidistat b. High limit ductstat c. Air pressure switch 7 Unit as manufactured by Dri- Steem, Armstrong or approved substitute, size and capacity as scheduled on drawings. pART 3 E2CECUTiZON 3.1 ROOFTOP AIR CONDITIONING UNIT AND HEAT PUMPS A. Furnish roof curb and turn over to General Contractor for installation. B. Furnish and install all accessories shipped with unit including filter frame, economizer and thermostat. C. Cap or plug gas connection at unit. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS D. Connect to cooling coil drip pan outlet to condensate drain. END OF SECTION 15700 SECTION 15700 PAGE 9 AIR HANDLING EQUIPMENT MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15800 PAGE 1 AIR DISTRIBUTION SYSTEMS FART G 1.1 WORK INCLUDED A. Duct Systems B. Hangers, and Supports C. Hardware and Accessories D Air Duct Cleaning E. Seismic protection of ductwork 1.2 CODES AND STANDARDS A. Comply with the current editions of the following standards unless specified or indicated otherwise: I. ASHRAE Guide Equipment Volume: Duct Construction, Chapter 1 2. "SMACNA HVAC Duct Construction Standards" 3 "SMACNA Industrial Duct Construction Standards" 4 "SMACNA Fire Damper and Heat Stop Guide for Air Handling Systems" 5. NFPA -90A 6. NFPA -90B 7 NFPA -96 8. Uniform Mechanical Code Standard No. 10.2 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. BART 2 PRODUCT. FABRICATION AND UTECUTION 2.1 HVAC DUCT CONSTRUCTION STANDARDS A. Comply with "SMACNA HVAC Duct Construction Standards" and with the following exceptions, selections or deviations. B Joint Sealant: Duro -Dyne SZ, Ductmate No. 795, Hardcast Sealing System, or fire retardant, high bonding type sealer with Class I flame spread rating as manufactured by United Sheet Metal Company, Inc. or Mom -Eco Industries, Inc. Adhesive- backed cloth or metallic furnace tape will not be acceptable. C. Fittings: 1. Square throat elbows in rectangular ducts must have double wall turn vanes. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS E. Volume Dampers: SECTION 15800 PAGE 2 AIR DISTRIBUTION SYSTEMS 2. Turn vanes must be double wall type. 3. Do not use straight tap for branch connections in rectangular duct. 4 Do not use dovetail joint for round branch connection to rectangular ducts. Provide notch spin in type. 5. Do not use adjustable type elbows in duct systems upstream of terminal boxes. 6. Provide, conical fittings in supply duct systems upstream of terminal boxes. 90 degree tee with oval to round tap may be used. 7 For round ducts over 48- inches diameter use continuously welded angle type RT -2A companion flange at transverse joint. 8. Acoustical Turning Vanes: a. Insulation filled, perforated face, factory fabricated acoustical turning vanes. b. Airsan "Acoustiturn Elgen No. AV 7 hollow turning vanes with No. AVR-6 push type side rails, or approved substitute. "Button Punch" side rails not permitted. 9 Terminal box upstream duct connection: a. Provide two box inlet diameter lengths of straight duct of the same diameter as the inlet diameter of the box. Where duct sizes on the drawing indicate larger or smaller size, provide increaser or reducer fitting ahead of straight length. b. Provide rigid connection to the box. c. Make connections with Mastic and Ideal stainless steel clamps. 10. Provide airtight stuffing boxes in supply ducts upstream of terminal boxes at penetrations, such as thermostats, thermometers and pipes. Use rubber grommets or U- channel rubber extrusions of Rubbercraft Manufacturer to create airtight seal. D Access Doors and Panels: 1. Provide access panels at fire dampers and combination fire/smoke dampers. 2. Access panel 16 -gauge single wall type with screws at 4- inches maximum spacing, and with Ventlok #299 gasketing material all round perimeter. 3 Provide access doors where indicated as follows: a. Double sheetmetal panel type construction, tight fitting, hinged, with latch; insulated or acoustic -lined equivalent to duct; steel angle frame. b. 18 -inch x 24 -inch minimum size. General, 24-inch x 72 -inch minimum for access into main plenum spaces; 12 -inch x 16 -inch size, or maximum possible size where duct dimensions do not permit this size, for access to duct mounted coils, automatic dampers or humidifiers, which are less than 3 -feet maximum. c. Special access doors for plenums and between filters and supply fan shall be 24-inch x 72- inch minimum size; double construction; Buenstod Stacey Type F -1, or C.E. Sparrow "Cesco" manufacturer or acoustical panel casing type as specified elsewhere. d. Die -cast latches; Ventfabrics Manufacturer. Catalog No. Door Sizes 100 2- feet -0- inches high or less 260 3- feet -0- inches high or less 310 3- feet-0- inches or higher (2 latches required) MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MA1NISURGERY ADDITIONS ALTERATIONS SECTION 15800 PAGE 3 AIR DISTRIBUTION SYSTEMS 1. Do not use splitter dampers. 2. Do not use orifice plates or perforated metal in lieu of volume dampers unless indicated on the drawings. 3. Sectionalize dampers with blade length over 48 -inch. 4 Do not use fire dampers for volume adjustment or control. 5. Use square damper rod. 6. Size dampers to obstruct approximately 95 percent of the duct area when in the closed position. 7 Dum -Dyne or approved substitute damper quadrants. a. #KS -145 for dampers maximum 10- inches long. b. #KS -385 for dampers maximum 80- inches long. c. K -7 with bearings for dampers longer than 80 -inch. d. Quadrants in finished spaces where dampers in ducts are concealed in finished walls or ceilings provide with Duro -Dyne Series SRC, sizes as listed for accessible ducts, or Young Regulator Series 301 or Ventlock Series 666 concealed damper operators. 8. Set and lock dampers in the "open" position. 9 Damper quadrant stand -offs for insulated ducts shall be 16 gauge galvanized steel damper quadrant stand -offs; 1 1/2 -inch height above duct surface; sized to permit secure attachment of damper quadrant; pop rivet connections to duct. F Flexible Connections: 1. Provide at duct connections to fan inlets and outlets, minimum clear length of 8 -inch. 2. Duro -Dyne "Durolon" Ventfabrics "Ventglas" or approved substitute. G. Hanging and Supporting System. 1 Do not use powder actuated fastening devices. Use steel expanding concrete anchors placed in drilled holes, Red -Head, Phillips Anchors or approved substitute. 2. Select upper attachments using a safety factor of 5. 3. Do not penetrate duct with screws. 4 Exposed duct in finished spaces: a. Rectangular and flat oval ducts provide trapeze hangers with minimum 3/8 -inch electro galvanized threaded rod and angle.iron or Unistrut channel. b. Round ducts provide 1 -inch by 16 -gauge split rings with minimum 3/8 -inch electro galvanized threaded rod. 5 Install ducts so that the ducts and hangers do not touch moving equipment or equipment supports, conduit or piping subject to vibration. 2.3 FIRE DAMPERS, SMOKE -FIRE DAMPERS AND SMOKE DAMPERS A. Codes and Regulations: 1. Fire damper construction and installation shall comply with requirements of the Uniform Building Code and to NFPA 90A. 2. Smoke -fire damper assemblies shall be UL labeled and shall meet all UL and NFPA requirements for primary fire dampers and shall be UL classified and shall meet NFPA MAHLUM NORDFORS MCIINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15800 PAGE 4 AIR DISTRIBUTION SYSTEMS requirements for smoke control dampers. 3. Smoke Dampers shall be UL classified and shall meet NFPA requirements for smoke control dampers. B Fire Dampers, Casings, Frames and Sleeves 1. Certification: All fire damper assemblies shall be UL listed and have a UL label. 2. Manufacture: Phillips -Aire, American Warming Ventilating Co, Louvers Dampers Inc, National Control Air Inc, Airstream, Prefco, Ruskin or approved substitute; factory- fabricated. 3 Type: Metal curtain folding blade, all parts steel; spring- closing, where placed horizontally 4 Construction Requirements: Blades recessed at duct edge; horizontal mullions or damper heads across the duct not allowed; if over 40 pounds force required to lift or reset the curtain, provided with lifting accessories and attachments; 90 percent of duct free area clear, inside damper. 5 Fusible Links For Each Damper. 30 pound load rating; UL listed and classified under category JGIZ, temperature setting 50 degrees F above maximum duct air temperature or 165 degrees F minimum 6. Casings for dampers shall enclose entire damper area frame and shall have sleeves to extend through wall or slab, except where damper casing is built into wall or slab. Sheetmetal thickness shall be four gauge sizes heavier than connecting ductwork or 16 gauge minimum for small ducts and. 14 gauge minimum for ducts over 24- inches wide and ducts over 36- inches high. All seams and joints shall be welded, with attachment lugs or straps for anchoring to wall or slab independent of ductwork. Casings shall incorporate change in size from rectangular to circular or oval, wherever connection is made to circular or oval ducts. 7 Provide 6 -inch x 8 -inch access plate in duct, accessible for inspecting and replacing the fusible link at each damper 8. Negative pressure relief valve, United McGill Corp type AR W shall be installed downstream of fire damper where shown on drawings. C. Automatic Smoke -Fire Dampers 1. Manufacture and Type: Ruskin Type SFD 60 "Fire -Smoke Damper" or Prefco Model 5020 with stainless steel blade bearing inserts and 20 gauge metal blade stiffeners, UL listed as a 1 1/2 hour fire damper, UL classified as leakage Class II per UL555S, with 15 cfm per cubic foot maximum leakage at 1 -inch w.g. differential pressure across closed damper. 2. Construction: 16 gauge galvanized steel frame with corner, braces and blade stops; 6- inches wide, 16 gauge galvanized steel blades with closure spring; stainless steel sleeve type bearings, 1/8 -inch x 1/2 -inch steel tie bars concealed in frame; 1/2 -inch axles; 160 degrees F fusible link. 3. Operating Shaft: Auxiliary operating shaft shall permit operation by a damper motor. When fusible link melts, damper shall be disconnected from the operating shaft, damper shall close and latch to function as a fire damper. 4 Sleeves, Frames and Casings: Same as specified for Fire Dampers. 5 Damper Operator Linkage: Damper shall be complete with operator shaft and support bracket to accept a damper motor operator supplied by the Temperature Control System Contractor. D Automatic Smoke Dampers 1. Performance Classification: UL classified and listed as leakage Class II per UL 555S with 15 cfm per cubic foot maximum leakage at 1 -inch w.g. differential pressure across closed damper. 2. Round Type: Ruskin Type CDR 25 butterfly type control damper, or equal by American t 1 t e 1 1 1 1 i 1 1 1 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15800 PAGE 5 AIR DISTRIBUTION SYSTEMS Warming and Ventilating Manufacturer, galvanized steel channel frame; 12 gauge steel blade; 1/2 -inch diameter full length axle and 6-inch axle extension beyond frame; bronze or stainless steel bearings; 1/2 -inch x 1/4 -inch steel air blade stop. Include a support bracket to accept a damper motor operator supplied by the Temperature Control System Subcontractor. 3. Rectangular Type: Ruskin SD 35 Smoke Damper, or equal by American Warming and Ventilating Company; galvanized steel channel frame with corner braces; 6- inches wide, 16 gauge galvanized steel blades with V crimped and interlocking edges; nylon or long wearing plastic shaft bearings; 1/2 -inch diameter extended control shaft; flexible aluminum blade end seals concealed blade linkages. Include a support bracket to accept a damper motor operator supplied by the Temperature Control System Subcontractor. 4 Oval Type: Ruskin Type CDO 25 butterfly type control damper, or equal by American Warming and Ventilating Manufacturer; galvanized steel channel frame; 12 gauge steel blade; 1/2 -inch diameter full length axle and 6-inch axle extension beyond air blade stop. Include a support bracket to accept a damper motor operator supplied by the Temperature Control System Subcontractor. F Diffuser and Exhaust Grille Housing and Fire Damper in One Hour Ceiling 1. Diffusers and grilles are specified. Diffusers shall be square with circular neck. Grilles to be compatible with ceiling type. 2. Housing and fire damper above diffusers and grilles shall be Pottorff (Prefco) Model HMMB- CFD-ST including a recessed metal box and horizontal fire damper for air inlet with intumescent coating on metal surfaces. At contractor's option, National Control Air Inc #CFS with CK -2000 Thermal Blanket and round transition plates may be used in lieu of Prefco assembly 3 Approvals: ICBO Research Report No. 2888P 4 Housing and diffusers shall be matched closely in size. Diffusers shall be fastened to the housing with concealed fastenings. 5. Hangers for housing shall be four taut No. 12 gauge steel rod hangers attached to clips on the housing and to anchor bolts in slab above, capable of supporting 4 times the load. G. Accessories 1. Duct Access Panels: Sheetmetal; 12 -inch x 16 -inch minimum size or maximum possible size where duct dimensions do not permit this size, for fire dampers and combination smoke -fire dampers, for access into duct as required to replace fusible link and reset damper. 2.5 MISCELLANEOUS A. Relief Backdrafter Dampers: 1. Metal blade type: Arrow United industries #335 with Counterbalance, Oilite bearings and 1/2 inch mesh bird screen. B. Wall Openings: 1. Seal space around ducts where ducts pass through walls, ceilings or floors. 2. Densely pack void space with loose fill fiberglass Insulation. install galvanized iron frame at each side of opening to cover edges of duct openings. C. Automatic Dampers: 1. Install automatic dampers furnished by the temperature controls subcontractor, and specified in MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Section 15900. SECTION 15800 PAGE 6 AIR DISTRIBUTION SYSTEMS D. Pressure Testing: 1. Test supply duct systems upstream of terminal boxes. 2. Leakage not to exceed 10 percent of the total design air flow when tested under a pressure of 1.5 times the working pressure. When partial sections of the duct system are tested, the summation of the leakage for all sections not to exceed the total allowable leakage. 3. Test method in accordance with 'SMACNA manual for the Balancing and Adjustment of Air Distribution Systems." 4. Notify Engineer at least 24-hours in advance of test. 2.6 MR DUCT CLEANING A. Thoroughly clean all ductwork except when systems are complete and before the project is balanced, including plenums, fans and coils. B Execution: 1. Cleaning shall be done with equipment utilizing compressed air for loosening and dislodging the dirt and power vacuum systems for collecting the dirt in the systems. 2. Access panels shall be provided so the duct cleaning equipment can reach all portions of the ductwork to be cleaned. C. Cleaning shall be by Power Vacuum and Air Blast Method by Ventilation Power Cleaning, Inc., or approved equal. D General: 1. Cleaning shall be to the satisfaction of the Architect. 2. Care shall be taken not to damage in any way duct lining and plenum lining Any damaged lining will be replaced at no additional cost to the Owner 3 A letter shall be submitted to the Architect by the cleaning contractor certifying that all systems have been completely cleaned. gtRT 3 EXECITIION 3.1 INSTALLATION A. Route ductwork to avoid interference with structure, ceiling supports and framing, lights and work of other trades. Provide offsets as required. B. Ductwork in General: 1. Elbows: a. Supply Ducts: Standard radius elbows per SMACNA Standards. Square elbows with vanes are allowed only where shown. b. Exhaust Ducts: Minimum elbow radius equal to 1/2 duct width. Square corner elbows allowed only where shown. 2. Circular Ducts: Spiral seam ducts as specified. 3. Duct Collars: Provide where exposed ductwork passes through walls, slabs or ceilings. MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15800 PAGE 7 AIR DISTRIBUTION SYSTEMS 4 Seams: Formed and sealed per SMACNA recommendations for 5 percent maximum leakage; standing seams are not acceptable on ducts other than plenums. Snaplock type seams by Lockformer tools are acceptable for low pressure ductwork where Pittsburgh seams called for. 5. Joints: Formed and sealed per SMACNA recommendations for 5 percent maximum leakage; T- 22 companion angle joints and T -23 flanged joints are not allowed. C. Provide steel angle framing on 18 -inch centers to support plenums and large ducts. Fasten lapped type seams to framing on 4 -inch centers or standing type seams to framing on 12 -inch centers. Provide supplementary bracing on horizontal surfaces to prevent deformation under system operating and "upset" pressures. Fasten sheetmetal to backing, steel screws. D Plenums: Provide horizontal structural support members for plenum floor, except where shown for General Contractor installation on Structural drawings. E. Duct Sealing 1. Seam and Joint Construction: Fill sheetmetal seams and joints with fire- retardant mastic prior to their assembly; construct seams and joints to retain mastic after assembly 2. Sealing Around Filters: Seal between the base of the filter casing and the floor surfaces with a polysulphide base mastic. Seal filter casing to walls with sheetmetal. 3. Pipe Penetrations: Seal per Figure 6-10, SMACNA HVAC Duct Construction Standards, 1985. 4 Flexible Connections at Fans: Provide flexible connections to connecting ductwork at fans and at air handling units with non internal spring isolated fans and at other locations as shown. Install flexible materials, with sufficient slack to permit 2- inches of horizontal or vertical movement of the fan or air handling unit, without stretching the flexible fabric. Support ductwork at flexible connection from the building structure. F Provide transitions to rectangular where fire dampers or air pressure reducing valves are installed in circular and flat oval ducts. G. Install automatic dampers furnished by the Controls Contractor. Provide all supports, bracing and closure plates. H. Remove construction debris and dirt in ducts and plenum interiors at end of work; no additional cost to the Owner I. Mitered Ducts and Fittings: Use radius ells and connections. J Adjustable or pleated elbows shall not be used. 3.2 SUPPORT A. Construct and install per recommended practices of SMACNA HVAC Duct Construction Standards, with the following additions and exceptions. B All hangers shall support the weight of installed ductwork and insulation. All ducting over 5 square feet in cross sectional area shall support the weight of the ductwork, insulation and the weight of a 200 pound person. C. Continuously threaded type steel rods 1/4 -inch minimum diameter shall be allowed only if electroplated. D Support terminal boxes with rod hangers or with non perforated strap hangers. Supports shall be MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 SEISMIC PROTECTION OF AIR DISTRIBUTION SYSTEMS SECTION 15800 PAGE 8 AIR DISTRIBUTION SYSTEMS attached to inserts in the slab, where possible. E. Provide hangers in pairs on exact opposite sides of horizontal duct, at the following locations. 1. Close to transverse joints of main ducts and branches, and for branch connections 3 -feet or greater in length. 2. Adjacent to fire dampers and to ducts penetrating walls and partitions. 3. Square `corner elbows at not over 24-inch intervals measured along the elbows. 4. At the mid -point of small and medium size horizontal radius elbows greater than 20 degrees change in direction. 5. One or more supplementary hangers, as necessary, along the radius elbows of any angle whenever the lengths of these arcs exceed the maximum hanger spacing length for that particular size duct. F Vertical ducts shall be supported using steel angles riveted to the sides of the ducts, which shall serve as a support bracing and shall be anchored by embedded anchor bolts to concrete walls, and by bolts welded to the structural steel for ducts adjacent to steel structures. Maximum spacing between such bracing angles shall be 8 -feet centers for full height of vertical ducts. G. Provide support for vertical ducts at the following locations. 1. Provide duct supports from floors and walls when necessary 2. Provide each duct riser with a minimum of two supports completely spanning the shaft opening at each floor One pair of supports may be used to support more than one duct riser, provided that the strength of the supports is increased appropriately and proper additional supplementary steel is used at the extra risers. 3 Support duct risers located between floors that are more than 15 feet high, at each floor and halfway points between floors. The distance between intermediate supports on very high floors should not exceed 12 feet. (Intermediate hangers may be supported from an adjacent wall or hung by rods from supports on the floor above). H. Secure vertical ducts on the outside of the building to the building wall as shown. Anchor structure shall be provided; made of welded structural steel, attached to embedded anchor bolts, shall be provided at base of the vertical riser Vertical Ducts Exposed in Accessible Areas Subject to Damage: No. 14 gauge welded galvanized steel; full length welds, silicon copper weld metal. Provide forged steel bar supports on both sides of duct, attached to anchor bolts in wall, 4- feet -0- inches on centers, full height of duct. Paint over welds and adjacent surfaces affected by heat, with a high zinc paint. K. Support of Ducts Above Roof: Provide hot dip galvanized steel angle frames at spacing shown, made of 1 -1/4 -inch x 1 -1/4 -inch x 1/4 -inch minimum steel angles, all welded, hot dip galvanized. 3.3 SUPPORT FOR EQUIPMENT A. Provide one or more sets of hangers for heating coils, VAV units, terminal boxes, and all other equipment in duct runs, as recommended by their manufacturers. A. Provide seismic protection for all ductwork and accessories in accordance with the most current edition of the SMACNA publication "Guidelines for Seismic Restraints of Mechanical Systems and Plumbing 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCIITLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Piping Systems' 3.5 MAXIMUM PERMITTED DUCT HANGER SPACING A. Ducts with areas up to 4 square feet shall have their hangers spaced up to 8 feet apart. B. Ducts with areas 4 1 to 10 square feet shall have their hangers spaced not more than 6 feet apart. C. Ducts with area over 10 square feet shall have their hangers located up to 4 feet apart. D. Provide Spring Type Vibration Isolators in each hanger for high pressure fan discharge ductwork from fan, to and including sound attenuators; also all other high pressure supply ducts in Mechanical Rooms. Isolators shall be 1/2 -inch minimum static spring deflection; springs loaded in compression; manufacture, same as specified under Section 15020. 3.6 ACCESS DOORS AND FRAMES A. Provide access doors where access to equipment in ducts or plenums is necessary Provide special access doors between rust air filter on intake airstreams and supply fans. 3.7 SHEETMETAL CONNECTIONS SECTION 15800 PAGE 9 AIR DISTRIBUTION SYSTEMS A. Supply Outlet (Square, Round or Rectangular Pattern Diffusers): Provide sheetmetal duct connection the same size and shape as the diffuser neck to the branch duct. B Air Cushion (Square, Round or Rectangular Pattern Diffusers): Branch duct shall extend full size at least one diameter of the diffuser neck, past the diffuser neck connection. C. Supply Outlet (Troffer, Plug -hi, Linear, and T -bar Diffusers): Provide flexible duct connection; 1 -foot- 6- inch minimum length, 6- feet -0- inches maximum length; ends clamped to diffuser boot and to duct connection; tightly fitted and fastened. D Supply and Exhaust Grille: Provide rectangular duct connection with mounting frame where required; flexible duct connections not allowed. E. Exhaust Inlet (Screened Opening): Provide angle frame and screened cover over duct opening. 3.8 Volume Dampers and Quadrants A. Damper Locations: Provide in the duct to each supply opening and exhaust opening. Provide branch volume dampers in all trunk ducts at each shaft penetration and in each branch duct from a main trunk duct and in each branch duct with 3 or more supply or exhaust openings. Provide additional dampers as shown on drawings. Locate dampers as far upstream from the outlets as possible and in accessible areas. B. Acoustic Performance: Noisy dampers as determined by the Architect shall be replaced. C. Ducts Concealed in Walls or Non Removable Ceilings: Install flush mounted concealed type damper quadrants at all such locations. D Damper Quadrants On Insulated Ductwork: Install a damper quadrant stand -off for each volume damper on insulated ductwork. Attach stand -off to duct and quadrant to standoff with pop- rivets. E. Damper Positions: Set and lock all volume dampers in the "Full Open" position prior to MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15800 PAGE 10 AIR DISTRIBUTION SYSTEMS commencement of balancing work on the system. 3.9 DRIP PANS AND MOISTURE ELIMINATORS A. Drip Pans: Provide in ducts or plenums under all cooling and heat recovery coils, coil headers and eliminators. B. Multiple Drip Pans: Provide (for coils in tiers where multiple tiers are over 24- inches high) under each coil tier, extend to 1 -1/2 -inch minimum diameter downcomer leader at one end of pan. C. Eliminators: Provide for all cooling coils. The eliminators shall be in sections with 36 -inch by 48 -inch maximum face area dimensions. Mount sections in frames and casings. 3.10 TESTING A. Pressure Testing of Medium Pressure Ductwork and Plenums: Test all ductwork and plenums before insulation is installed to determine system tightness. B. Test Method: Provide temporary caps at each end of each plenum or duct section to be tested. Furnish portable blower with volume adjustment and a calibrated orifice for determining cfm of air being added to ductwork. Submit certified performance data on blower and orifice. Include diameter of orifice and calculation of air flow through orifice at three differential pressures to verify performance curve of test unit. Maintain pressure equal to the rating stated in section 15800, paragraph 1.02,B in duct; make sufficient preliminary tests and examinations of each section at this pressure, and seal all observable leaks so that leakage during final testing will be at or below maximum permissible leakage. C. Permissible Leakage: Add up the lengthwise cross sectional area in a plane through the duct centerline, which shall be calculated by multiplying the duct length by the duct diameter for all circular duct sections to be tested. For oval ducts, reinstate rectangular diameter; and for transition sections, use average diameter For rectangular ducts and plenums, use the duct or plenum width plus height divided by two to obtain an equivalent diameter Maximum permissible leakage shall not exceed 1 -1/2 CFM, for each 4200 square inches of total cross section area of all ducts under each test. Final test of each section will be witnessed by the Architect. Give at least 7 days prior notice before such test. D Test Data: Record data of test results of final test only including sketch or diagram of testing section showing all dimensions in inches, computation of total lengthwise cross section area and actual leakage found during the test. Upon completion of testing, submit data to the Architect. f. 3.11 INSTALLATION OF SMOKE, FIRE FIRE DAMPERS A. Dampers, Casings and Sleeves: Damper casings and sleeves shall extend through walls or slabs. Connections to ductwork shall be tightly fitted slip fit to ductwork; sealed with fire- retardant mastic. All sleeves and casings shall be anchored to wall or slab independent of ductwork. Dampers shall be installed in wall or slab openings utilizing sleeves, angles, other materials and practices required to provide an installation equivalent to that utilized by the manufacturer when dampers were tested by UL. Installation shall be in accordance with damper manufacturer's instructions. B Links: Install in damper assembly to prevent damper vibration. C. Duct Access Panels at Dampers: Provide in the sheetmetal duct at each fire damper and combination smoke -fire damper, for access to replace fusible links and reset the damper gasketed and attached to ductwork with sheetmetal screws, 6-inch maximum screw spacing to centers. 3.12 SMOKE DETECTORS 1 1 1 s t 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS A. Smoke Detectors: Mounted directly on outside of duct; install remote alarm lamp and coveiplate in ceiling directly below the duct mounted unit. B. Wiring: For circuit and installation, see electrical drawings and specifications, Section 16000. END OF SECTION 15800 SECTION 15800 PAGE 11 AIR DISTRIBUTION SYSTEMS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART1 GENERAL 1.1 WORK INCLUDED A. Filters and filter frames. B. Service filter housing. C. Filter gauges. 1.2 CODES AND STANDARDS PART II PRODUCT SECTION 15850 PAGE 1 AIR FILTRATION A. All filter performance ratings based on tests in accordance with ASHRAE Test Standard #52 -76, unless noted otherwise. B. All filter media Underwriters Laboratories (UL) listed as Class 1 and 2. C. Quantity size, type and resistance as scheduled on the drawings. D Manufacturer must guarantee performance and performance must be stated in the manufacturer's printed literature. 1.3 RELATED WORK A. All portions of specification Division 1 apply to this work. B. All portions of specification section 15010 apply to this work. C. Additional sections of the mechanical specifications may be required to provide a fully functional system. Refer to the specifications index. 2.1 REPLACEABLE (300 500 FPM FACE VELOCITY) A. Dry Media (30 percent): 1. 2 -inch thick non -woven cotton media pleated, 30 percent efficiency ASHRAE Dust Spot, 65 grams/sq ft dust holding capacity 93 percent ASHRAE Weight Arrestance, with heavy duty beverage board enclosing frame. 2. Media in a 16 -gauge galvanized steel or plated steel holding frame with wire fasteners retaining clips and polyurethane foam gasket. Fasteners removable without use of tools. 3. New -Aire HC Type 40, Farr 30/30, Cambridge Aeropleat, or approved substitute. B. Dry Media (65 percent): 1. Non -woven cotton or glass fiber media pleated 65 percent efficiency ASHRAE. Dust Spot, 65 grams/sq ft dust holding capacity 93 percent ASHRAE Weight Arrestance with heavy duty Kraftboard or galvanized steel enclosing frame. 2. Media with Kraftboard enclosing frame provided' in a 16 -gauge galvanized steel or plated steel holding frame with wire fastener retaining clips and polyurethane foam gasket. Fasteners removable without use of tools. 3. New -Aire HC type 60, Farr Riga -Flo- 15, Cambridge Aerosolve 55, or approved substitute. MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAI•/SURGERY ADDITIONS ALTERATIONS 2.2 SIDE SERVICING FILTER HOUSING SECTION 15850 PAGE 2 MR FILTRATION C. Dry Media Bag Filters (95 percent): 1. Ultrafine glass fiber media 90 percent efficiency ASHRAE Dust Spot, 99 percent ASHRAE Weight Arrestance in steel head and frame. Filter Media area as scheduled. 2. Media in a 16 -gauge galvanized steel or plated steel holding frame with wire fastener retaining clips and polyurethane foam gasket. Fasteners removable without use of tools. 3 New -Aire 10P, Cambridge Hi -Flow Super Hi -Flo, VAV Hi -Flo American Air Filter DriPak, or approved substitute. D Fixed (Pleated) Media Type Filters: 1. Manufacture and Type: American Air Filter Company "Dri -Pak" Series 209H, Farr N/S -100; or Cambridge "Aerosolve" Servodyne "Unipak" or Continental "Conosac" equivalent; with 24- inch square metal face panels, and tubular or pleated media. Efficiency shall be 85 percent minimum, NBS Dust Spot Test Method, with atmospheric dust. Initial resistance shall not exceed 0.37 -inch w.g. 2. Filter Frames: Stationary assembly built up of individual stationary filter frames, with gaskets and with latching devices to hold replaceable media and holding frame firmly in the stationary frame; individual frames formed steel angle type made of steel, No. 16 gauge at least 3 -inch deep, permanently assembled with solid rivets. Where height or width exceeds 6 -feet, provide stiffener of No. 16 gauge sheetmetal with hemmed exposed edge, 8 -inch wide, full height and width of filters on 6 -feet centers. Finish of all metal parts of frame shall be hot dip galvanized and additional high build epoxy finish 0.020 -inch minimum thickness. F Fixed (Pleated) Media Type Filters, With Cabinet: 1. Manufacture and Type: Same as Fixed Media Filters, General. 2. Filter Cabinets: American Air Filter Type SA "Dri -Pak" or Farr "Glide- Pak" cabinet; 18 gauge metal filter casing, slide -in airtight sealing tracks; access doors, duct connected filter cabinet inlet and outlet. A. Factory- fabricated and assembled with 16 -gauge galvanized or plated steel housing, reinforced and braced. B. Tracks to accommodate final filters. Filter housing to accept various range of filter efficiencies, with positive sealing gaskets on top and bottom of tracks. C. Farr Eco -Glide Pack, Cambridge, American Air Filter ServiSide, and New -Aire. FART 3 EXECUTION 3.1 GENERAL A. Install filters in filter banks, flat or V -bank configuration as indicated on the drawings. Secure filter sections in racks with airtight seals between filter sections and at perimeter of filters to prevent bypass of unfiltered air Install filters for service access as shown on the drawings. B. Provide air filter gauges for all filters, Dwyer Magnehelic Gauge, Series 2000 with Fig. #4-3 accessories. Range of the gauge selected for appropriate installation. Provide weatherproof enclosure for all gauges installed in rooftop or otherwise exposed units. Provide engraved phenolic plate indicating "CLEAN" filter and "CHANGE" filter readings. Install pressure sensing taps and tubing so 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 15850 PAGE 3 AIR FILTRATION that filter servicing will not restrict taps or damage tubing. C. Prior to air system balancing, install temporary filter media in all filter housings. During supply system balancing, install a perforated plate or other device to simulate 125 percent of the initial airflow resistance across all of the filters.. D. Following air balance and final construction clean -up, provide clean filters throughout. END OF SECTION 15850 MAHLUM NORDFORS MCKINLEY GORDON SECTION 15900 PAGE 1 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS PAM PENERAL 1.1 GENERAL REQUIREMENTS A. The "General Conditions' of the specification apply to work specified in this section; consult them in detail for applicable instructions. B. All components of the Direct Digital Control (DDC) system must meet applicable local code requirements. 1.2 GENERAL DESCRIPTION A. Furnish and install a networked Direct Digital Control (DDC) system for control and monitoring of the building heating, ventilating and air conditioning systems as described in this specification. B System shall consist of stand -alone DDC panels, sensors, automatic valves, actuators, dampers, operating software, operator training, installation labor, warranty and all other necessary material and labor to provide a complete and workable system. 1.3 INSTALLATION AND QUALITY A. The entire building shall be installed by skilled electricians and control mechanics, all of whom are properly trained and qualified for this work, All wiring shall be installed in accordance with Division 16 of these specifications and applicable national, state and local codes. B. Supervision and checkout of the system shall be by local branch engineers and technicians directly employed by the Contractor C. Contractor shall be a manufacturer -owned service organization which stocks and has direct factory access to the manufacturer's standard parts, manuals and training options. Contractor shall be fully capable of system inspection, trouble shooting, maintenance, and service to the system. D Contractor shall maintain a field service office within 150 miles of the project site. This field office shall have a minimum of five years experience engineering and installing the control systems proposed for this project. At engineer's request, provide a listing of at least ten projects of similar magnitude, complexity and facility type completed within the past five years. 1.4 SUBMITTAL/ DRAWINGS A. Submittals 1. The contractor shall submit, prior to installation, a set of install tion drawings, equipment data sheets and control strategies for review by the consultant and/or Owner's representative. 2. These drawings shall include the physical location of all building control system panels and controllers as well as a diagram indicating complete DDC system architecture. 3 The complete sequence of operation for the control system shall be provided. 4 A complete list of monitored and controlled points shall be provided. B Record Drawings (As- builts) 1. Upon completion of the installation and final system, adjustment the contractor shall provide and deliver to the Owner a full set of record drawings of the installation and the control strategies including printouts of all system programs, system databases and system operating parameters. 2. Record drawings shall be submitted in 11 X 17" bound format. At owner's request, provide a MAHLUM NORDFORS MCKINLEY GORDON SECTION 15900 PAGE 2 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAINISURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS copy of as -built drawings on 3 -1t2' floppy disks. C. Standards and Format 1. All submittals shall be generated on reproducible AutoCAD (Version 10 or later) schematic diagrams. 1.5 SYSTEM TURN -OVER AND SERVICE A. Upon completion of the installation, the contractor shall initiate operation of the control system and perform all necessary testing and diagnostics to ensure proper operation. A formal commissioning procedure shall be utilized to insure complete system integrity and conformance to these specifications. This procedure shall be a completely documented procedure. Contractor's recommended commissioning plan shall be submitted with the initial submittal for approval by engineer At a minimum, submittal shall include a step -by -step, written description of the commissioning plan as well as the project specifications B An acceptance test in the presence of the owners representative, and/or the Project Manager shall be performed. Deficiencies revealed by the failed test(s) shall be repaired and the test(s) repeated until successful. C. The graphical interface software shall be installed prior to completion and all modifications to reflect as -built conditions and changes shall be completed within fourteen (14) days of the scheduled completion date. 1.6 TRAINING. OWNER'S INSTRUCTION A. The contractor shall provide to the Owner two (2) copies of an operator's manual describing all operating and routine maintenance service procedures to be used with the system. B The contractor shall instruct the owner's designated representatives in these procedures during the start -up and test period. The instruction shall consist of two separate training components: on -site, project specific training and off -site factory training. C. On -site training shall consist of a minimum of one (1) full day (8 hours total) of training performed by an engineer familiar with the specific design of the system provided for this project. 1.7 WARRANTY A. The building control system, including all hardware and software components shall be warranted for a period of one year following owner's beneficial use of system. For phased project completion, the warranty shall also commence in phases. Any manufacturing defects arising during this period shall be corrected without cost to the owner B In addition to the hardware warranty, the Contractor shall correct any software sequences that do not meet the specified sequence of operation. Modification or repairs required due to changes enacted by the owner's system operators during the warranty period will not be considered warranty items. 1.8 ACCEPTABLE MANUFACTURERS A. The DDC system shall be provided by Landis Gyr, as an extension of the existing system, NO SUBSTITUTIONS. B. Pricing structure has been negotiated prior to bid with engineer /owner. Contact Landis Gyr, Greg Ackerson, (206) 455 -3700 for pricing. MAHLUM NORDFORS MCIINNLEY GORDON SECTION 15900 PAGE 3 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS PART 2 PRODUCTS 2.1 DDC SYSTEM A. GENERAL 1. The Direct Digital Control (DDC) system shall possess a fully modular architecture, permitting expansion through the addition of DDC controllers, slave panels, terminal equipment controllers, operator terminals, personal computers and/or a general purpose multi- tasking, multi- operator minicomputer. B. DDC CONTROLLER 1. DDC controllers shall be stand alone, microprocessor based, with a minimum word size of 16 bits. They shall be multi- tasking, multi- user, real -time digital control processors, communication controllers, power supplies and input/output point modules. Controller size shall be sufficient to fully meet the requirements of this specification and the attached point list and with spare capacity and expandability features as described below 2. Each DDC controller shall have sufficient memory (minimum 1 MB) to support its operating system and databases including trending, dial -up communications, alarm management and manual override monitoring. 3. Each DDC controller shall support monitoring and control of the following types of points, without the addition of equipment outside the DDC controller cabinet: a. Analog Inputs (AI): 4-20 mA 0-10 Vdc Thermistors 1000 ohm RTDs b. Digital Inputs (DI): Dry Contact Closure Pulse Accumulator Voltage Sensing c. Digital Outputs (DO): Contact Closure (motor starters, sizes as required) d. Analog Outputs (AO): 0-20 psi 4-20 mA 0-10 Vdc 4 Each DDC controller shall have a minimum of one spare of each point type analog inputs, digital inputs, analog outputs, digital outputs) and no less than 10% expandability within the controller enclosure. Provide all processors, power supplies and communication controllers complete so that the implementation of a new point only requires the addition of the appropriate point input/output termination module and wiring. Provide sufficient internal memory for the specified control sequences and have at least 25% of the memory available for future use. 5. The operator shall have the ability to manually override automatic or centrally executed commands at the DDC controller via local, point discrete, on -board hand/off/auto operator override switches for digital control type points and gradual switches for analog control type points. These override switches shall be operable whether the panel is operational or not. Switches shall be mounted either within the DDC controller key accessed enclosure, or externally mounted with each switch keyed to prevent unauthorized overrides. DDC controller shall monitor the status of all overrides and inform the operator that automatic control has been inhibited. DDC controllers shall also collect override activity information for reports. At a minimum, all digital outputs (except terminal controllers) shall have supervised manual switches. 6. DDC controllers shall provide local LED status indication for each digital input and output for constant, up-to -date verification of all points conditions without the need for an operator I/O MAHLUM NORDFORS MCKINLEY GORDON SECTION 15900 PAGE 4 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDMONS ALTERATIONS TEMPERATURE CONTROLS device. Graduated intensity LEDs or analog indication of value shall also be provided for each analog output. 7 DDC controllers shall provide at least two RS -232C serial data communication ports for operation of operator I/O devices such as industry standard printers, operator terminals, modems and portable laptop operator's terminals. DDC controllers shall allow temporary use of portable devices without interrupting the normal operation of permanently connected modems, printers or terminals. 8. Each DDC controller shall continuously perform self- diagnostics, communication diagnosis and diagnosis of all panel components. The DDC controller shall provide both local and remote annunciation of any detected component failures, low battery conditions or repeated failure to establish communication. 9 DDC Controllers shall have the ability to perform any or all of the following energy management routines: a. Time of-day scheduling b. Calendar -based scheduling c. Holiday scheduling d. Temporary schedule overrides e. Start-stop time organization f. Automatic Daylight Savings Time switchover g. Night setback control h. Enthalpy switchover (economizer) i. Peak demand limiting j. Temperature compensated duty cycling 10. The software program specified in this Section shall be provided as an integral part of DDC controllers and shall not be dependent upon any higher level computer for execution. All programs shall be executed automatically without the need for operator intervention and shall be flexible enough to allow user customization Programs shall be applied to building equipment as described in the Sequence of Operations. 11. Alarm management shall be provided to monitor and direct alarm information to operator devices. Each DDC controller shall perform distributed, independent alarm analysis and filtering to minimize operator interruptions due to non critical alarms, minimize network traffic and prevent alarms from being lost. Any critical alarms shall have the capability of generating a user defined message and routing that message to any operator device or printer. At no time PC workstation, local 1/0 device or communications with other panels on the network. 12. A variety of historical data collection utilities shall be provided to manually or automatically sample, store and display system data for points. Each DDC controller shall have a dedicated RAM -based buffer for trend data storage and shall be capable of storing a minimum of 10,000 data samples. Trend data shall be stored at the DDC controllers and uploaded to the workstation (if provided) when retrieval is desired. For systems with graphical workstation capabilities shall the DDC controller's ability to report alarms be affected by wither operator or activity at a, uploads shall occur based upon either user defined interval, manual command or when the trend buffers are full. All trend data shall be available for use in Microsoft Word or Excel applications. C. APPLICATION SPECIFIC CONTROLLERS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCKINLEY GORDON SECTION 15900 PAGE 5 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAINJSURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS 1. GENERAL a. Provide Application Specific Controllers (ASC's) as required for control of unitary mechanical systems or pieces of equipment. Each ASC shall be a microprocessor -based DDC control unit and shall be capable of operating either as a stand -alone controller or on a multi -drop communications network originating at the DDC controller. Provide each ASC with sufficient memory to operate in a truly independent manner, that is, each ASC shall support its own inputs and outputs, operating systems, database and programs necessary to perform control sequences and energy management routines. b. Provide the following types of ASC's as necessary. Unitary Controllers (UC's) Terminal Equipment Controllers (TEC's) 2. UNITARY CONTROLLERS (UC's)\ a. UC's shall include all point inputs and outputs necessary to perform the specified control sequences. Provide a hand -off automatic switch for each binary output for manual override capability Switches shall be mounted either within the controller's key accessed enclosure, or externally mounted with each switch keyed to prevent unauthorized overrides. In addition, each switch position shall be supervised in order to inform the system that automatic control has been overridden. As a minimum, 50% of the point inputs and outputs shall be of the universal type, allowing for additional system flexibility In lieu of universal inputs and outputs, provide a minimum of 50% spare points of each type. b. Each UC shall support its own real -time operating system. Provide a time clock with 72 hour battery backup to allow for stand -alone operation and to insure protection during power outages. Should the controller reside on a DDC controller network, the clock operation shall be overridden by the DDC controller clock to insure network continuity c. All databases and programs shall be stored in non volatile FFPROM or a minimum of 100 hour battery back -up shall be provided. All programs shall be field- customized to meet the user's exact control strategy requirements. Controllers utilizing pre packaged or canned programs shall not be acceptable. d. Local alarming and trending capabilities shall be provided for convenient troubleshooting and system diagnostics. Alarm limits and trend data information hall be user definable for any point. e. Each UC shall have connection provisions for a portable laptop or similar programming tool. This tool shall allow the user to display generate or modify all point databases and operating programs. All new values and problems shall then be restored to EEPROM. 3 TERMINAL EQUIPMENT CONTROLLERS (TEC's) a. Control of terminal units such as VAV boxes, heat pumps and reheat boxes shall be accomplished by a microprocessor based stand -alone controller utilizing direct digital control. The Terminal Equipment Controller (TEC) shall interface to the building control system in a multi-drop communications network originating at the DDC field panel. An individual controller must be listed by Underwriters Laboratory under UL 916 PAZX and UL UDTZ. b. For VAV boxes, the controls contractor shall furnish the terminal controller (controller, damper motor, flow transducer) to the terminal unit manufacturer for factory mounting. Costs associated with factory mounting of terminal controller shall be covered by terminal unit manufacturer The terminal box manufacturer shall provide an averaging air velocity sensor suitable for interfacing with the TEC's differential pressure transducer. MAHLUM NORDFORS MCIONLEY GORDON SECTION 15900 PAGE 6 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS c. Each TEC shall be accessible for purposes of control and monitoring from a central or remote operator's terminals as specified herein. d. TEC damper actuator shall be of the 24 Vac floating point type. Upon power loss, the actuator maintains its current damper position. Position status is shown in percentage open notation. e. TEC room temperature sensor shall come complete with a terminal jack and programmable override switch integral to the sensor assembly The terminal jack shall be used to connect the portable operators terminal to control and monitor all hardware and software points associated with the terminal unit. A terminal jack may be alternatively located on a stainless steel wall plate mounted adjacent to the sensor. An override switch shall initiate override of the night setback or unoccupied mode to normal operation when activated. A thumbwheel -type temperature setpoint dial shall also be provided with 1 Deg F temperature increments. Override switch and temperature setpoint functions may be locked out, canceled or limited as to time or temperature via software. f. TEC's for VAV or CV applications shall be provided with integral differential pressure transducer capable of accepting an average air flow measurement signal from the terminal box averaging air velocity sensor. The value is converted through a square root function to average airflow by the TEC. TEC control valve electronic actuators shall mount on the valve body and provide complete modulating control of the valve. Valve body shall separate from actuator for servicing without requiring any special tools or electrical connections. The actuator shall be of the floating control point type. h. TEC wiring terminal bars are to be detachable type allowing quick serviceability of the electronic controller hardware without the removal of the existing wiring. g. D AUTO ANSWER/AUTO -DIAL MODEM 1. Provide connection to existing autoanswer /autodial modem. 2.2 FIELD DEVICES A. TEMPERATURE SENSORS 1 All temperature sensors shall be solid state electronic, employing a resistance type output. Room and zone temperature sensors may be thermistor type. All duct sensors shall be rigid or flexible probe, averaging RTD -type sensors. All duct mixed air sensors shall be flexible averaging RTD -type sensors with sensor element length suitable for complete duct coverage. Pipe sensors shell be RID-type. Provide outside air temperature sensors with watertight inlet fitting and sunlight shield. All single point sensors shall be accurate to a minimum of ±.0.5 degrees F at 77 degrees F calibration point. Duct averaging sensors shall be accurate to a minimum of 1.0 degrees F B CONTROL DAMPERS 1. Provide low leakage, galvanized steel control dampers with roll- formed steel frames and blades and oil- impregnated bronze bearings. Dampers shall have blade seals and stops, equal to Ruskin CD36. 2. Leakage shall be no greater than 10 CFM per square foot at 4 in. W.C. with 20 in. -lbs. torque applied regardless of size. 3 Provide opposed blade type dampers unless indicated otherwise. All multi- section dampers shall be provided with factory linkage to allow connection of actuator at one common point. MAHLUM NORDFORS MCKINLEY GORDON SECTION 15900 PAGE 7 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS C. DAMPER AND VALVE ACTUATORS 1. All modulating damper and valve actuators shall be 24vac electric motor type; floating point, 0- 10Vdc, 0 -16Vdc or other industry standard input signal type. Actuators shall function properly within the range of 85 to 110 percent of line voltage. 2. Provide actuators in sufficient size, quantity and type to match application. Provide a minimum of one damper actuator for each 30 square feet of damper area. 3 Damper actuators shall be rotary action -type (90 degrees) designed for direct connection to damper shaft wherever possible. Provide position indication on exterior of actuator body 4 All valve actuators for steam applications shall be mounted at a 45 degree offset from vertical to avoid heat damage to actuator. 5 Actuators shall be spring return as indicated by Normally Closed or Normally Open designation on drawings or in sequence of operation. D CONTROL VALVES 1 Modulating Valves 2' and Smaller. Bronze body and seat with stainless steel stem and screwed ends. ANSI Class 250 body rating. Suitable for fluid temperatures of up to 300 degrees F Equal percentage flow characteristics capable of smooth operation at differential pressures present in the system. Landis Gyr Powers VE WG/VXG 44, VE698, Flowrite VE598 or approved equal. 2. Sizing: Modulating control valves shall be correctly selected for service and flow of system served. A pressure drop of 5 psi shall be used as a sizing guideline unless specifically noted otherwise in project documents. Two position shutoff valves shall be line size. E. LOW TEMPERATURE DETECTION THERMOSTATS 1. Provide low temperature control thermostat, electric type manual reset, non averaging 20 feet long sensing elements that switch whenever any 6 inch section or more of any portion senses a temperature as low as the thermostat setpoint as specified in sequences. 2. Provide with two sets of contact, one for hardwired fan shutdown and one for remote monitoring. 3 Powers ET141 or approved equal. F DIFFERENTIAL PRESSURE SWITCHES 1. Provide air and liquid differential pressure switches for status of pumps and fans as called out in sequences and input/output summary 2. Diaphragm operated SPDT snap switch with ranges from .05' W.G to 12.0' W.G. for air Airflow switch shall be Powers SW 141 or approved equal. 3 Liquid switch shall be PENN P74 or equal. G. CURRENT SENSING DELAYS 1. Provide current sensing relays for status of fans and pumps as called out in sequences of input/output summary Provide with field adjustable current setpoint range. 2. Nielsen Kuljian or approved equal. H. INTERPOSING RELAYS 1. Track mounted SPDT relays (or as required) for all interposing applications. 2. IDEC or approved equal. MAHLUM NORDFORS MCIONLEY GORDON SECTION 15900 PAGE 8 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS I. PRESSURE SAFETY SWITCHES 1. Provide static pressure high limit switches as required by sequence of operation to sensing duct over pressure condit ion. Provide with adjustable setpoint. Provide with spare contacts for monitoring by DDC system. 2. Switch shall be suitable for duct mounting. Dwyer Series 3000, Ashcroft or approved equal. nu FUCITrLON 3.1 SEQUENCE OF OPERATION A. All setpoints, limits, etc. shall be adjustable through the central CPU or the laptop computer connected to the system. B. Sequence of operations are designed to illustrate basic control functions only Temperature Controls Contractor shall review drawings and submit complete installation data, including minor details, to provide proper operation in his submittal. Where an item differs from specifications, Controls Contractor shall submit manufacturer's recommendations subject to Architect's approval. C. HOA OVERRIDE/ STATUS PANEL Provide HOA/status override panel including the following for all mechanical equipment control excluding terminal controllers. 1. Hand/Off/Auto selector switch for each binary output. 2. Hand/Auto variable positioner for each analog output. 3. Feedback to central panel for annunciation of hand position. 4 LED status for each binary output and input. 5 Variable intensity LED status for each analog output. 6. Lock cover to prevent unauthorized access to switches. 7 Cover to include clear tamperproof front for viewing switch position and LED indication. 3.2 SEQUENCE OF OPERATION SYSTEMS {AC 2, AC AC A. Scope: The supply air systems serve single -duct system with hot water reheat coils and one variable volume. Supply air system consists of supply fan, return fan, prefilters, sinal filters, outside dampers with flow measuring capabilities, return and relief air dampers, dx cooling coil and condenser. System shall operate 24-hours but shall be capable of a night set back operation. B Start-Up: The supply fan shall be directly controlled by the controller according to the program established by the Owner. The return fan shall be electrically interlocked to operate with the supply fan. Supply and return fans shall be controlled to start "unloaded" C. Basic Temperature Control: A temperature controller sensing fan discharge temperature shall maintain the supply air temperature setpoint by modulating the outside air return air relief air dampers and dx coil in sequence. Provide discharge temperature reset based on hi -low zone conditions. D On sensing a rise in temperature, controller shall first modulate the outside/relief air dampers open and the return air damper closed. A continued rise shall cause the direct expansion valve to modulate open/ E. If the fans are running during unoccupied hours, a signal shall override damper modulation and close the outside /relief air dampers. During occupied hours, an outside air temperature switch shall override MAHLUM NORDFORS MCKINLEY GORDON SECTION 15900 PAGE 9 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS the damper modulation signal and position the dampers to provide minimum ventilation only F When outside air temperature is low enough to provide economizer cooling, a temperature reset program shall lower supply air temperature setpoint as low as possible to maintain a 76 °F (adjustable) return air temperature without offset. G. Freeze Protection: A low temperature detector, manual reset type, with range adjustable between 10°F and 50 °F shall be provided at the downstream side of the dx coil, set at 36 °F If the temperature drops below 36 °F, low temperature detector shall stop the fan and outside air dampers shall close. H. Upon signal from duct smoke detector with fire alarm and electrical contractors. 3.3 ZONE RE -HEAT COIL CONTROL {RH} A. Provide two-way control valve, unless otherwise noted on the drawings, in the hot water supply line to each zone heating coil which shall be modulated by its room thermostat to maintain setpoint temperature. B. Provide three -way control valve in the hot water supply line to each zone heating coil located at end of supply air duct which shall be modulated by its own room thermostat to maintain setpoint temperature and also maintain hot water system flow 3.4 COMBINATION SMOKF/FIRE DAMPERS A. Smoke Damper Control: Actuators shall be controlled by the fire alarm system specified in Division 16. 3.5 ROOFTOP EXHAUST FANS {EF} A. Exhaust Fan: Exhaust fans shall be started through the time switch specified for the supply and return fans. 3.6 INSTALLATION REQUIREMENTS A. CONTROL WIRING 1. All line voltage wiring and low voltage wiring in exposed areas shall be run in EMT conduitor wiremold. Wiring runs exposed in finished areas shall be in wiremold. 2. Wiring shall be in accordance with the "Electrical' section of these specifications, Section 16000, and all applicable codes. Wiring within concealed, accessible spaces may be run with plenum -rated cable as allowed by local codes. 3 If utilized in lieu of conduit plenum -rated cable shall be run in an orderly manner, tied and bundled every 3 feet on average. B LABELS AND IDENTIFICATION 1. Identify all equipment and panels. Identification shall be with labels describing equipment and panel use and function. 2. Labels shall be engraved with contrasting test using bakelite, plastic or metal material. Labels shall be permanently glued or mechanically fastened. 3 All wires and cables shall be identified with permanent markers at each end. The wire designator shall match those on the shop and installation drawings. C. GENERAL MAHLUM NORDFORS MCKINLEY GORDON SECTION 15900 PAGE 10 OLYMPIC MEMORIAL HOSPITAL AUTOMATIC 2MAIN/SURGERY ADDITIONS ALTERATIONS TEMPERATURE CONTROLS 1. Provide and install devices, relays, switches, thermostats, sensors, dampers, conduit, wiring, and tubing to provide a complete temperature regulation and control operation system. All wiring shall be run in concealed areas where possible. Where necessary to be exposed it shall be installed in a workmanlike manner. 2. Contractor is responsible for providing a complete and operational system as called out in the sequence of operation and/or in the input/output summary and/or the mechanical/electrical drawings for this project. Any item referenced in one part of the system documentation but not listed elsewhere shall be covered undercontractors pricing (i.e. damper called out in sequence but not indicated on drawings). D. OUTSIDE COMMISSIONING AGENT 1. Contractor is required to provide a completely installed and commissioned DDC control system as outlined in previous portions of this specification. 2. At the Owner's option an outside commissioning agent may be retained to insure mechanical system compliance with specifications. The control system contractor shall have the following responsibilities under the scope of this contract a. Provide submittal and/or as -built documentation. b. Participate in specified job acceptance test with owner's representative. c. Provide specified owner training d. Perform all system startup and commissioning procedures as required and described previously by the specification. e. Respond to project punch list and correct any system deficiencies. 3 Any additional training, documentation, software, on -site or modem assistance, system functionality or general project management required in support of a commissioning process not specified as part of the Contract Documents shall be considered work outside this contract. END OF SECTION 15900 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS DIVISION 16 ELECTRICAL SPECIFICATION INDEX SECTION 16010 GENERAL PROVISIONS SECTION 16020 SCHEDULE SECTION 16030 TESTING SECTION 16040 IDENTIFICATION SECTION 16051 EXISTING CONDITIONS SECTION 16100 BASIC MATERIALS METHODS SECTION 16110 RACEWAYS SECTION 16114 CABLE TRAYS SECTION 16115 CABLE RINGS SECTION 16120 CONDUCTORS TERMINATIONS SECTION 16130 OUTLET AND PULL BOXES SECTION 16140 SWITCHES AND RECEPTACLES SECTION 16160 MOTOR CONTROLLERS SECTION 16170 DISCONNECTS AND FUSED SWITCHES SECTION 16180 FUSES SECTION 16190 SUPPORTING DEVICES SECTION 16450 GROUNDING SECTION 16470 SWITCHBOARD SECTION 16471 PANELBOARDS SECTION 16500 LIGHTING SECTION 16501 LIGHT FIXTURE SCHEDULE SECTION 16660 ISOLATED POWER SYSTEM SECTION 16670 EQUIPOTENTIAL GROUNDING SYSTEM SECTION 16700 COMMUNICATIONS SECTION 16721 FIRE ALARM SYSTEM MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16724 SMOKE DAMPER CONTROL SECTION 16731 ELAPSED TIME CLOCKS SECTION 16732 CLOCK SYSTEM SECTION 16740 TELEPHONE, COMPUTER RACEWAY SYSTEMS SECTION 16750 NURSE CALL SECTION 16758 INTERCOM SYSTEMS SECTION 16775 PUBLIC ADDRESS SYSTEM SECTION 16781 TELEVISION SYSTEM SECTION 16791 DICTATION RACEWAY SYSTEM SECTION 16930 LIGHTING CONTROL EQUIPMENT SECTION 16950 PNEUMATIC TUBE SYSTEM SECTION 16999 PROJECT CLOSEOUT I hereby certify that this project specification was prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Washington. Sparling, Inc. Electrical Engineers j \7206\specs\index EXPIRES 1 117 720 Olive Way Suite 1100 Seattle, WA 98101 (206) 667 -0555 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 GENERAL SECTION 16010 PAGE 1 GENERAL PROVISIONS Conform to the General Conditions, Supplementary Conditions, and related work in other Divisions for all work in Division 16 See Division 1 for sequence of work. 1.2 SCOPE OF WORK It is the intention of this Division of the Specifications and the accompanying drawings to describe and provide for the furnishing, installing, testing and placing in satisfactory and fully operational condition all equipment, materials, devices and necessary appurtenances to provide a complete electrical system, together with such other miscellaneous installations and equipment hereinafter specified and/or shown on the drawings. The work shall include all materials, appliances and apparatus not specifically mentioned herein or shown on the drawings, but which are necessary to make a complete, fully operational installation of all electrical systems shown on the drawings or described herein. Equipment and devices furnished and installed under other Divisions of this specification (or by the Owner) shall be connected under• this Division. The drawings and specifications are complementary and what is called for in either is binding as if called for in both. 1.3 WORK IN OTHER DIVISIONS See all other divisions of specifications for other work which includes but is not limited to: Temporary Power Cutting and Patching Door Hardware Painting, Refinishing and Finishes Equipment Wiring Conveying Systems Mechanical Control Wiring Mechanical Equipment Fire Protection 1.4 CODES AND REGULATIONS A. If any conflict occurs between government adopted code rules and this Specification, the codes are to govern. Nothing in these drawings and specifications shall be construed to permit work not conforming with the governing codes. Also, this shall not be construed as relieving the Contractor from complying with any requirements of the drawings or specifications which may be in excess of requirements of the hereinbefore mentioned governing codes and rules and not contrary to same. B The electrical systems shall be installed based on the following current Standards. NFPA 70 National Electrical Code as adopted and amended by the State of Washington or Local Jurisdiction Uniform Building Code International Conference of Building Officials as adopted and amended by the Local Jurisdiction. The Contractor is required to familiarize himself with the detailed requirements of these standards and any local codes and ordinances as they affect the installation of specific electrical systems. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1.5 PERMITS AND FEES SECTION 16010 PAGE 2 GENERAL PROVISIONS The Contractor shall obtain and pay for all licenses, permits and inspections required by laws, ordinances and rules governing work specified herein. The Contractor shall arrange for inspection of work by the inspectors and shall give the inspectors all necessary assistance in their work of inspection. 1.6 COORDINATION A. The Contractor responsible for accomplishing Division 16 work shall coordinate his work with that of the other Contractors and/or other trades doing work on the project and shall examine all drawings and specifications of other trades including the mechanical, architectural, and structural for construction details and necessary coordination. B. Obtain submittals and shop drawings of all equipment with electrical connections furnished under other divisions of the specifications. Provide all wiring in accordance with requirements indicated. Advise the Architect of any changes which may affect the contract price. C. Special attention is called to the following items and all conflicts shall be coordinated prior to installation. 1 Door swings to the end that switches will be located on the "strike" side of the door 2. Location of grilles, pipes, sprinkler heads, ducts and other mechanical equipment so that all electrical outlets, lighting fixtures and other electrical outlets and equipment are clear from and in proper relation to these items. 3 Location of cabinets, counters and doors so that electrical outlets, lighting fixtures and equipment are clear from and in proper relation to these items. 4 Recessing and concealing electrical materials in new CMU walls, concrete construction, precast construction and similar construction methods. 5 Electrical characteristics (HP KVA, voltage, phase) of actual equipment furnished under other divisions being different from that shown on the electrical drawings. D The Contractor will not be paid for relocation of work, cuttings, patching and finishing required for work requiring reinstallation due to lack of coordination prior to installation. 1.7 CONTRACT DRAWINGS A. Raceways, boxes and ground connections are shown diagrammatically only and indicate the general character and approximate location. The layout does not necessarily show the total number of raceways or boxes for the circuits required, nor are the locations of indicated runs intended to show the actual routing of the raceways. The Contractor shall furnish, install and place in satisfactory condition all raceways, boxes, conductors and connections and all other materials required for the electrical systems shown or noted in the contract documents to be complete, fully operational and fully tested upon completion of the project. B. The drawings do not show all requirements of the specifications. The drawings and specifications are complementary and what is called for (or shown) in either is required to be provided as if called for in both. C. The horsepower of motors and apparatus wattages shown on the drawings are estimated requirements of equipment furnished under other Divisions of this contract and bid shall be based on these sizes. Overload elements shall be provided to suit actual equipment nameplate current. Advise Architect of any MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS equipment changes or substitutions affecting electrical systems. Conform to Substitution Requirements, Section 16100 D Any minor changes (less than 6'-6 horizontal) in the location of the raceways, outlets, boxes, devices, wiring, etc. from those shown on the drawings shall be made without extra charge, where coordination requires or if so directed by the Architect before rough -in. E. Contractor shall consult the architectural drawings for the exact height and location of all electrical equipment not specified herein or shown on the drawings. F Outlet locations shown on the drawings are approximate. Contractor shall study the building drawings in relation to spaces and equipment surrounding each outlet so that the outlet is correctly positioned and symmetrically located for proper usage. Lighting fixtures are to be symmetrically located according to ceiling tile and room layout. G. When inserts or sleeves for outlet boxes, conductors, cables and/or raceways are required, Contractor shall provide and shall fully coordinate the installation thereof with other trades. 1.8 ITEMIZED SCHEDULE OF COSTS Furnish a contract cost breakdown by specification section to the Architect with a copy to the Engineer to allow evaluation of partial payment requests. Refer to the Supplementary Conditions of General Contract for details, and conform thereto. 1.9 WARRANTY SECTION 16010 PAGE 3 GENERAL PROVISIONS The Contractor shall guarantee all work installed under this specification. He shall make good, repair or replace, at his own expense, any defective work, materials or parts which may show themselves within one year after final acceptance, if in the opinion of the Architect said defect is due to imperfection in material, design or workmanship. Incandescent lamps are not warranted, but all shall be operating at time of final acceptance. 1.10 RECORD DRAWINGS Continually record the actual electrical system(s) installation on a set of prints kept readily available at the project during construction. These prints shall be used for this purpose alone. Accurately locate with exact dimensions all underground and underslab raceways and stub -outs. At the completion of the work, Contractor shall furnish the Architect a set of reproducible record drawings (xerox type) and the set of mark -ups. Final payment to the Contractor will not be authorized until these prints have been submitted to and accepted by the Architect. 1.11 ELECTRICAL EQUIPMENT OPERATION AND MAINTENANCE (O &M) MANUALS A. The Contractor shall prepare four (4) O&M manuals for all equipment furnished under Division 16 of the specifications. B. The information included must be the exact equipment installed, not the complete "line" of the manufacturer Where sheets show the equipment installed and other equipment, the installed equipment shall be neatly and clearly identified on such sheets. C. These 0 M manuals shall contain all the information needed to operate and maintain all systems and equipment provided in the project. It shall be presented and arranged in a logical manner for efficient use by the Owner's operating personnel. The information provided shall include but not be limited to the following: MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1 Equipment manufacturer, make, model number, size, etc. 2. Equipment nameplate data. 3 Description of system configuration and operation including component identification and interrelations. A master control schematic drawing(s) may be required for this purpose. 4 Dimensional and performance data for specific unit provided as appropriate. 5 Manufacturer's reconunended operation instructions as appropriate. SECTION 16010 PAGE 4 GENERAL PROVISIONS 6. Manufacturer's recommended lubrication. and servicing data including frequency as appropriate. 7 Complete parts list including reordering information, recommended spares and anticipated useful life (if appropriate). Parts lists shall give full ordering information assigned by the original parts manufacturer Relabeled and/or renumbered parts information as reassigned by equipment supplier not acceptable. 8. Shop drawings. 9 Wiring diagrams. 10 Signal equipment submittals shall contain step -by -step circuit description information designed to acquaint maintenance personnel with equipment operation in each mode of operation. D Wiring diagrams for each system shall be complete drawings for the specific system installed under the contract. "Typical" line diagrams will not be acceptable unless properly marked to indicate the exact field installation. E. The information contained in the manuals shall be grouped in an orderly arrangement by specification index. The manuals shall have a typewritten index and divider sheets between categories with identifying tabs. The completed manuals shall be bound with hard board covers. (0 M manuals shall not exceed 5' thick. Provide two or more volumes if required. Signal and communication systems shall be in separate volume(s).) The covers shall be imprinted with the name of the job, Owner, Architect, Electrical Engineer Contractor and year of completion. The back edge shall be imprinted with the name of the job, Owner and year of completion. Hard board covers and literature contained may be held together with screw post bindings. Bayless Bindery (206) 622 -6395 acceptable. F A preliminary copy complete except for the bound cover shall be submitted 60 days prior to completion of the project for checking and review Five (5) bound, final, corrected copies shall be provided. Deliver one (1) to Sparling, Inc. Deliver four (4) to the Owner via the Architect 20 days prior to scheduled instruction periods. Obtain a receipt for the manuals and forward a copy of the receipt to both the Architect and Engineer with the completed form. 1.12 INSTRUCTION PERIODS After substantial completion of the work and 20 days after the 0 M manuals have been delivered to the owner and after all tests and final inspection of the work by the Authority(s) Having Jurisdiction; the Contractor shall demonstrate the electrical systems and instruct the Owner's designated operating and maintenance personnel in the operation and maintenance of the various electrical systems. The Contractor shall arrange scheduled instruction periods with the Owner The Contractor's representatives shall be superintendents or foremen knowledgeable in each system and suppliers representatives when so specified. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Scheduled instruction periods shalt be: 1. Lighting Control Power Distribution System 1/2 day 2. Fire Alarm System 1 day 3 Intercom Sound Systems 1/2 day 4 TV System 1/2 day 5 Clock- Program System 1/4 day 6. Nurse Call System 1 day 1.13 FINAL ACCEPTANCE REQUEST SECTION 16010 PAGE 5 GENERAL PROVISIONS The Contractor shall submit to the Architect, with a copy to the Engineer a Job Completion Form (form attached in this section) properly filled out prior to the time final acceptance of the electrical work is requested. At this time also submit copies of final inspection certificates and receipts for loose materials (pillow speakers, etc.) turned over to the Owner MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PROJECT NAME. PROJECT LOCATION. DATE. A. Electrical Inspectors Final Acceptance Copy of certificate attached. Name Name 1 Lighting Power Systems 2. Fire Alarm System 3 Communication Systems D Record Drawings Attached Transmitted previously to E. O M Manuals Attached Transmitted previously to F Test Reports Attached Transmitted previously to JOB COMPLETION FORM B. Fire Marshal's Final Acceptance of Fire Alarm System Copy of certificate attached. G. The work is complete in accordance with contract documents and authorized changes except for and the architect/engineer's representative is requested to meet with at Supervisor of Electrical Work Time Agency Date Agency Date C. The following systems have been demonstrated to Owner's representative. Owner's Rep. Date Owner's Rep. Date Owner's Rep. Date on SECTION 16010 PAGE 6 GENERAL PROVISIONS Date Date Date Date Contractors Rep. Signature Date Note: Additional copies of this form are available from Sparling, Inc. 720 Olive Way Suite 1100 Seattle, WA 98101 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS 1.14 ABBREVIATIONS AND DEFINITIONS When the following abbreviations and definitions are used in relation to the work for Divisions 16 they shall have the following meanings: Item Meaning Accepted Reviewed with no exceptions taken to submittal material. See "Submittal" below AHJ Authority Having Jurisdiction ANSI American National Standards Institute Approved Inspected and accepted by the Authority Having Jurisdiction ASTM American Society for Testing Materials Boxes Outlet, Junction or Pull Boxes Code All codes currently enforced at project location. Compression Compressed using a leverage powered (hydraulic or equivalent) crimping tool Connection All materials and labor required for equipment to be fully operational. EMT Electrical Metallic Tubing Exterior Outside of or penetrating the outer surfaces of the Location building weather protective membrane. Fully Oper- Tested and approved and operating to the satisfaction ational of the AHJ manufacturer and contract documents SECTION 16010 PAGE 7 GENERAL PROVISIONS Furnish Deliver to the jobsite ICEA Insulated Cable Engineers Association Install To enter permanently into the project and make fully operational. KCM Thousand circular mils (formerly MCM) Mfr Manufacturer NEC National Electrical Code, National Fire Protection Association Publication #7O (latest adopted edition with amendments) NEMA National Electrical Manufacturers Association NFPA National Fire Protection Association Noted Shown or specified in the contract documents MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS PVC Polyvinyl Chloride Provide Furnish and install RGS Rigid Galvanized Steel Required As required by code, AHJ or contract documents for the particular installation to be fully operational. Shop Drawing Hand drafted document which fully details the equipment and intended installation relative to this specified project. Shown As indicated on the drawings or details. Submittal Material for Engineer review which may contain catalog cuts, shop drawings, wiring diagrams, etc. of the actual material being furnished. UL Underwriters' Laboratories, Inc. Wiring Raceway conductors and connections SECTION 16010 PAGE 8 GENERAL PROVISIONS END OF SECTION 16010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 GENERAL SECTION 16020 PAGE 1 SCHEDULE A. This project requires relocation and modifications of existing electrical distribution equipment. Temporary' disruption of electrical services to portions of the existing hospital will be required to perform this work. This specification describes the sequence of work to be included in the Basic Bid. Owner and Engineer will consider Contractor proposed methods during construction only if the proposed methods are at no additional cost to the Owner B See Section 01011 for additional limitations of work schedule. C. Work performed in occupied areas which maintain normal business hours shall be performed outside normal business hours. D Work performed in or impacting areas of 24 hour occupancy including 2 West, 3rd Floor, and 2 East shall be coordinated with Owner E. If at any time, fire alarm system cannot be maintained in occupied and construction areas, coordinate fire watch with Owner and local Fire Marshal. F The Public Address system is used to annunciate Code Blue Status throughout the hospital. If at any time the Public Address system cannot be maintained in all occupied area of the hospital, provide a temporary emergency communication system. Coordinate system with Owner 1.2 RELOCATION OF PANELBOARDS A. Trace existing panelboard circuits. B Install new panelboard and panelboard service. C Install conduit and conductors from new panelboard to intercept point in existing panelboard branch circuiting. D Coordinate with Owner power shut -down on a circuit by circuit basis in occupied areas. Identify to Owner individual devices to be affected by each circuit shut -down. E. Transfer circuits individually to new panelboard. 1.3 RE FEED OF EXISTING ATS Z AND PANEL Z A. Identify to Owner devices to be affected during power transfer B Verify fire alarm panel battery capacity If necessary provide additional battery capacity for panel during power transfer C Provide a temporary 300KW generator and temporarily re -feed panel Z from temporary generator D Complete installation of new feeders for ATS -Z and Panel Z. E. Make final connection to Panel Z. F Power transfers to occur outside hospital normal hours of operation. Maximum down time 1 hour MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16020 PAGE 2 SCHEDULE 1.4 REPLACEMENT OF PANEL 41Y1 A. Identify to Owner devices to be effected during power transfer and Panel 41Y1 downtime. B. Provide a temporary 50KW generator and temporarily re -feed panels 42Y1 and 1Y1 from temporary generator C. Complete installation of new panel 41Y1. D Power transfers to occur outside hospital normal hours of operation. Maximum down time 1 hour END OF SECTION 16020 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION SECTION 16030 PAGE 1 TESTING Test and provide written certification that the entire electrical installation complies with contract documents, code and proper system operation. Perform acceptance tests in accordance with manufactuter's recommendations, NFPA 70B and International Electrical Testing Association (NETA) testing specifications NETA ATS -1991 A. Testing company The following testing shall be performed by an independent testing company 1 Molded -Case Circuit Breakers 2. Submit all reports 1.2 SCHEDULE Perform all testing after installation. All systems shall pass tests prior to substantial completion or owner occupancy 1.3 RECEPTACLE AND DEVICE TEST A. Receptacle Polarity Test: Test every receptacle installed or reconnected under this contract with a receptacle circuit tester Tester shall test for open ground, reverse polarity .open hot, open neutral, hot and ground reversed, hot or neutral and hot open. Rewire receptacles with faults and retest. Submit test report signed by electrician that performed the test. B Ground -Fault Receptacle Circuit Interrupter Tests: Test each receptacle or branch circuit breaker having ground -fault circuit protection to assure that the ground -fault circuit interrupter will not operate when subjected to a ground -fault current of less than 4 milliamperes and will operate when subjected to a ground -fault current exceeding 6 milliamperes. Perform testing using an instrument specifically designed and manufactured for testing ground -fault circuit interrupters. Apply the test to the receptacle. 'TEST' button operation will not be acceptable as a substitute for this test. Replace receptacles that do not shutoff power with 5 /1000 of an ampere within 1 /40th of a second and retest. Submit test report signed by electrician that performed the test. C. Operational Tests: Demonstrate the operation of each switch, circuit breaker and other item of electrical control with the systems fully energized and operating. Each shall be demonstrated three times. 1.4 600 VOLT WIRING A. Scope: Test all electrical feeders whose 'operating voltage is 600 volts or less that are installed or reconnected under this contract. Submit test report signed by electrician that performed the tests. B Test for continuity of each circuit. C. Test for grounds in each circuit which shall consist of the physical examination of the installation to ensure that all required ground jumpers, devices, and appurtenances do exist and are mechanically firm. D Perform a 500 volt megohm meter test on each circuit between the conductor and ground. The insulation resistance shall not be less than 2 megohms for circuits under 115V 6 megohms between conductor and ground on those circuits (115V -600V) with total single conductor length of 2,500 feet and over nor less than 8 megohms for those circuits (115V -600V) with single conductor length of less than 2,500 feet. If conductor fails test replace wiring or correct defect and retest. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS E. Perform torque test for every conductor tested and terminated in an overcurrent device or bolted type connection; torque all connections per manufacturers recommendations and tabulate the results on a tabular form. 1.5 POWER SYSTEM TESTS SECTION 16030 PAGE 2 TESTING A. Scope. Inspect end test entire electrical systems provided by this contract to verify equipment and controls are correctly operating. Submit test report signed by electrician that performed the tests. B. Load Balance Tests: Checks all panelboards for proper load balance between phase conductors and make adjustments as necessary to bring unbalanced phases to within 15% of average load. C. Motor Tests: Check all motors for proper rotation and measure actual load current. Submit tabulation of motor currents for all motors 1 HP or more after the HVAC system has been balanced. D Phase Relationship Tests: Check connections to all new and existing equipment for proper phase relationship. During such check, disconnect all devices which could be damaged by the application of voltage or reversed phase sequence. E. Transformer Taps: After facility is completely occupied for two weeks, measure secondary voltages at all existing transformers with revised loads. Forward a list to engineer including service switchboard voltmeter reading at the time of the test for evaluation. Reconnect taps as subsequently directed. 1.6 MOLDED CASE CIRCUIT BREAKERS A. Scope. Test all new circuit breakers 100 amps and over within new or existing switchboards and panelboards. Bench test new circuit breakers 100 amps and over that are installed in existing switchboards and panelboards. Submit tests signed by electrician that performed the tests. B Inspect each breaker operate manually and electrically Test shunt trips and alarm devices manually and electrically C. Adjust breaker trips to settings furnished by the coordination study and verify settings of the manufacturer's rating by passing controlled current through the trip devices. Record values and report deficiencies. D Circuit Breaker Electrical Tests 1 Contact resistance shall be measured. 2. Time current characteristic tests shall be performed by passing three hundred percent (300 rated current through each pole separately Trip time shall be determined. 3 Instantaneous pickup current shall be determined by run -up or pulse method. Clearing times should be within four (4) cycles or less. 4 Insulation resistance shall be determined pole to pole, across pole and pole to ground and across open contacts. Test voltage shall be 1000 volts D C. 5 Check trip unit reset operation. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 B One copy of each test report shall be delivered directly to the electrical engineer and Owner within 7 calendar days of the test. 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 2 PRODUCTS 2.1 TESTING COMPANY A. Retain the services of an independent testing company that is qualified to test electrical equipment, and is an approved testing company by the Washington State Department of Labor and Industries. The testing company shall not be associated with the manufacturer of equipment or systems under test. Approved companies: Electro -Test, Apparatus Service and Engineering Technology Inc. Westinghouse Engineering Service (for equipment not manufactured by Westinghouse). B. Testing company shall prepare test reports on the systems they test. 2.2 TEST EQUIPMENT The Contractor shall provide all apparatus and material required for testing. The Contractor shall use installation tools and test equipment which are designed for the specific task and shall use this equipment per the manufacturer's instructions. All test equipment shall have current calibration certification by a third party calibration laboratory and shall have a signed and dated calibration sticker affixed to the device. Calibration shall be traceable to the National Bureau of Standards and be less than 6 months since last calibration. Defective test equipment and installation tools shall not be used. Installation tools such as torque wrenches shall be calibration certified. PART 3- EXECUTION 3.1 PROJECT DOCUMENTS Deliver the following project documents to testing company two weeks prior to testing: Division 16 Specification Electrical Floor Plans showing equipment to be tested. Electrical One Line Diagrams Submittals of Manufacturers Data and Shop Drawings including engineers review letter of all, systems to be tested. Coordination Study 3.2 SCHEDULE Notify Architect 10 working days prior to performance of any test. 3.3 TEST REPORTS A. The Contractor shall prepare test reports including description of project, description of equipment tested, description of test, test results, conclusions and recommendations, retesting results and list of test equipment used and calibration date. C. Insert a copy of each test report in the operation and maintenance manuals. SECTION 16030 PAGE 3 TESTING MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 RETESTING 3.5 LABELS 3.6 OBSERVATIONS BY ENGINEER 3.7 TROUBLESHOOTING SECTION 16030 PAGE 4 TESTING Any fault in material or in any part of the installation revealed by these tests shall be investigated, replaced or repaired by the Contractor and the same test repeated at Contractor's expense until no fault appears. Upon completion of the tests a label shall be attached to all serviced devices. These labels shall indicate date serviced and the testing company Contractor shall remove and replace covers of electrical equipment, open manholes and remove/replace ceiling tiles to permit engineer to observe equipment and wiring provided upon request. Furnish ladder and flashlight. If a system or device provided under this contract does not operate per manufacturers specifications, contractor shall provide qualified individuals with tools and test equipment to find and repair problem at contractor's expense. END OF SECTION 16030 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 Provide identification as described in this Specification. A. Provide reduced framed drawings in the following locations: Maintenance Office: Elec Room B0001 Elec Room B004A. Elec/Mech Room B52. Elec Room B49• Elec Room B47 E/G Room. Elec Room BOO4B Elec Room B20 Elec Room B0002 Sheet E5 0, E5 1 E5.2, E5.3 E5 4 E5.5 E5 6 Sheet E5 1 Sheet E5.2 Sheet E5.2 Sheet E5.3 Sheet E5.3 Sheet E5 4 E5.5 E5 6 Sheet E5 4 Sheet E5 4 Sheet E5.5 E5 6 Coordinate mounting location with hospital maintenance department. B MAINTENANCE MANUAL Provide one copy of each reduced drawing in the electrical maintenance manual. PART 2 PRODUCTS 2.1 REDUCTION OF ELECTRICAL DRAWINGS Reduce drawing size to approximately 16 x 18 inches using xerox reduction process and print on 20 pound bond. Blue print paper is unacceptable. Contact engineer to obtain updated original plans for printing. 2.2 FRAMED DRAWINGS Frame shall be extruded aluminum, 4 point screw mount, with plexiglass cover PART 3 EXECUTION 3.1 FRAMED DRAWING Attach firmly to wall with four screws. SECTION 16040 PAGE 1, IDENTIFICATION END OF SECTION 16040 1 1 1 1 1 1 1 1 1 1 t 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 RELATED WORK Same as in Section 16010 General Provisions. Section 16020 Schedule 1.2 EXISTING SYSTEMS MAINTAINED A. Prior to bidding, existing systems and systems adjacent to the work shall be investigated thoroughly Any damage resulting from performance of work under this contract shall be repaired to assure continuing operation and integrity during and at completion of the project at no increase in contract cost. B Any existing wiring serving devices to remain in service and which is interrupted by work performed under this contract shall be rerouted to maintain circuit continuity Contractor shall assume the risk of maintaining existing systems except relocation of wiring of #2 AWG and above shall be considered an additional cost if not shown to be relocated. If such wiring is found the Contractor shall notify Architect of wiring location, reason it must be removed and cost of relocation and receive the Owner's approval before proceeding with the work. C. The building will continue operation during the work and it is essential that no systems operation be interrupted unless scheduled with the Architect. Contractor shall assume responsibility for unscheduled interruptions and expedient repair B All ceiling areas in project area. Provide new raceway support system for all existing raceways above existing or new accessible ceilings in accordance with Section 16110 3 8. (Note: The original construction consists of raceways being supported by the ceiling suspension system which is unacceptable to the Electrical Inspector) Provide new support system for all existing fixtures in project area in accordance with Section 16190 1.3 EXISTING SYSTEMS CONCEALED A. The electrical drawings show portions of the existing electrical systems which are to remain, be removed or be modified as a part of the Contractor's work. Concealed features of the existing systems are derived from record drawings and the Engineer's best judgment of the configuration, but no guarantee is made as to their correctness. 1.4 EXISTING SYSTEM DRAWINGS B The Contractor shall inspect the existing installation prior to bidding and shall make his own judgment as to the work required to provide a complete installation and demolition within the intent of the contract documents. The drawings show portions of the existing systems which are derived from record drawings. The drawings are incomplete and no guarantee is made to their correctness. The Contractor shall assume there is 20% more electrical systems than shown on the demolition and existing system drawings. 1.5 DEMOLITION WORK SECTION 16051 PAGE 1 EXISTING SYSTEMS Not all demolition work required under this contract is shown on the drawings. The Contractor shall remove all electrical equipment in the area being remodeled which is no longer in service presently or as a result of this contract. The definition of electrical equipment is any equipment mentioned in the National Electrical Code. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 TEMPORARY ELECTRICAL EQUIPMENT Removing, temporary hanging by chains and reinstalling in ceilings of light fixtures, speakers, detectors, exit signs and other electrical equipment is not shown on the drawings. The Contractor shall investigate the ceiling demolition work and include this work in the bid. The sequence of work shall be (1) Remove and store fixtures, detectors and speakers along with removal of ceiling, (2) Provide temporary support for wired fixtures and devices to be reinstalled in new ceiling at approximately the same location. Use chains for lighting fixture support, (3) Clean and reinstall in the new or replaced ceilings. Provide new lamps when so noted. Provide temporary relocation of exit signs connected to existing emergency circuits and reinstall in the original location when exit is reactivated. 1.7 PREMIUM TIME Premium time shall be included in the Base Bid for electrical system(s) outages and for other work as required by the schedule, as shown on the drawings and as noted in other Divisions of the specifications. 1.8 WORK OUTSIDE OF REMODEL AREAS SECTION 16051 PAGE 2 EXISTING SYSTEMS Caution this work is not shown on the contract documents. Provide new wiring systems in concealed ceiling spaces to switchboards, panelboards, communication and signaling and system control panels. Provide new conduit systems in ceiling spaces of floor below remodel floors. Remove and relocate electrical equipment in the way of other trades work installed under this contract. Spaces above existing ceilings are highly congested. Route wiring around obstructions and provide pull boxes per code. 1.9 EXISTING FLOOR SLAB CONDITIONS A. Existing floor slabs are post tensioned concrete slabs. Contractor shall penetrate floors by core drilling only Extreme caution is required to avoid cutting post tensioned cables. X -ray of floor shall be performed prior to selecting location of cores and anchors for electrical equipment. Cores and anchors shall be kept 2" minimum away from the post tensioning cables. Contractor shall assume the responsibility for the cost of repairing or replacing post tensioned cables. B This project requires a substantial number of floor core drills by other trades. The core drilling may result in damage to existing circuits embedded in the floor slab. The base bid shall include cost for repairing twenty (20) circuits damaged by core drilling. Repair shall include tracing new circuit, chipping out concrete to tie box into existing conduit and providing re- routed conduit and conductors. PART 2 PRODUCTS 2.1 EXISTING MATERIALS All materials which are a part of the building shall remain the property of the Owner 2.2 EXISTING MATERIALS TO BE REINSTALLED Existing materials and equipment (except interior, undamaged raceways) that are removed as a part of the work or stored in surplus shall not be reinstalled as a part of the new systems unless specifically noted or authorized in writing by the Owner Forward a copy of the authorization to the Engineer The requirements of the specifications (i.e. condition, installation, testing, etc.) shall apply as if the materials were new furnished by the Contractor 1 1 1 1 1 it i r 1 111 1 s 11 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.3 EXISTING MATERIALS NOT TO BE REINSTALLED A. In coordination with the Architect, these materials shall be made available for his inspection and decision as to whether the Owner will retain possession. Items selected for retention shall be turned over to the Owner These items shall be delivered to a location on the premises selected by the Owner Take reasonable care to avoid damage to this material. If the Contractor fails to conform to this requirement, he shall purchase and turn over to the Owner replacement material of like kind and quantity B All material not selected for retention by the Owner and all debris shall be legally disposed of by the Contractor 2.4 EXISTING RACEWAYS The Contractor may reuse the existing raceways if no other systems occupy the raceway raceways and enclosures are electrically and mechanically continuous and new wiring is provided. No warranty is made and the Contractor shall assume the risk of using existing outlet boxes and raceway systems. PART 3- EXECUTION 3.1 EXISTING CONDITIONS SECTION 16051 PAGE 3 EXISTING SYSTEMS Examine the structure, building, and conditions under which electrical work is to be installed for conditions detrimental to proper and timely completion of electrical work. Do not proceed with work until deficiencies or detrimental conditions have been corrected. Report deficiencies or detrimental conditions of existing electrical work which might be unsuitable to connect with or receive other work. Failure to so report shall constitute acceptance of other work as being fit and proper for the reception of electrical work. 3.2 EXISTING SYSTEMS MAINTAINED A. General Reroute existing circuits that are interrupted as a result of this contract that serve devices to remain in service. 1 Power Circuits Trace out and identify loads and systems being served. Provide temporary wiring, schedule outage and reconnect loads to temporary wiring. Provide new wiring in new location. Schedule outage, disconnect temporary wiring, and connect loads to new wiring. 2. Signal and Communication Systems Trace out and identify device and systems being served. Provide temporary wiring to maintain operation of system throughout facility Schedule outage and connect to temporary wiring and test system. Provide new wiring and new equipment in project area. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16051 PAGE 4 EXISTING SYSTEMS Schedule outage, disconnect temporary wiring and connect new wiring and new equipment and test system. 3.3 EXISTING SYSTEMS MODIFIED A. Where modifications are made to existing panelboards, provide revised panel schedule mounted in the panel and provide new panelboard label. Label shall meet requirements of Section 16471 B Where modifications are made to existing device circuiting, provide new engraved faceplate or nameplates as required to match new circuiting. 3.4 DEMOLITION Panelboards, signaling and communication systems, lighting fixtures, other electrical equipment free standing or surface mounted, raceway (exposed) and conductors; which are no longer in service presently or as a result of this contract shall be removed. Unused flush mounted devices, outlet and other boxes in finished areas shall be removed from wall and the remaining hole patched to match adjacent wall surfaces. Unused raceways and sleeves embedded in concrete shall be cut flush at ceiling, floor or wall and filled with grout. Unused raceways above ceilings that are empty shall be removed. Contractor shall remove all floor wall or ceiling mounted electrical equipment in the "Demolition Area" indicated on the drawings even if the equipment/or device is not shown on the project drawings. If Contractor questions whether a particular device is to be removed notify the Architect noting type and location of device. If so directed the Contractor shall maintain the existing device in service without any change in contract price. 3.5 POWER OUTAGES A. Scheduled Outages. The facility will continue its normal operation during the construction work; therefore it is required that the Contractor schedule electrical system(s) outages with the Owner Electrical system(s) outages to Owner occupied areas shall not be permitted from 7 am to 6 pm on any day of the week. Submit a written request for a power outage at least one week in advance identifying the areas, and systems that will be affected, time and duration of the power outage. The Contractor shall receive written authorization to proceed with the outage and shall renotify the Owner verbally at least one hour prior to the outage and also notify the Owner when the outage is completed. B Unscheduled Outages. In the event that the Contractor's work causes or contributes to an unscheduled system(s) outage (or other system fault), the Contractor is responsible for immediately correcting the problem. Included (as examples) shall be any premium time required to stay on the job site until problem is corrected and air freight for parts not locally available. If the Contractor fails to correct the problem, the Owner's cost of correcting the problem shall be deducted from the Contractor's contract amount. C. Removal or relocation of existing panelboards. Prior to demolition work, trace out and identify each branch circuit and feeder circuit. Temporarily refeed branch circuits and feeder circuits that serve loads in occupied areas. Outages for each branch circuit shall not be more than 20 minutes. Remove or relocate the panelboard. Move feeders and circuits to relocated or new panelboards. Outages shall not be more than 20 minutes. D In areas of 24 hour operation, such as O.B./Delivery (3 Main), Contractor shall identify specific devices and lights connected to branch circuits with scheduled outages. Contractor shall assist owner in verifying that circuit outage will not impact equipment or rooms `in -use' at time of outage. r 1 f 1 1 1 1 1 1 1 N 1 1 t 1 1 1 1 1 t 1 1 t 1 1 1 r 1 MAHLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.6 ACCESS TO PERFORM WORK SECTION 16051 PAGE 5 EXISTING SYSTEMS Carefully remove, store or temporarily hang and re- install in undamaged condition all electrical equipment, lighting fixtures and ceiling tiles where access to perform work is required. Clean prior to re- installation. Provide fldsh mounting for devices in existing walls. Fish conduit in wall. Where existing boxes are indicated to be reused, extend box as necessary and provide new devices and plates. Contractor is cautioned that the existing building contains clay tile and concrete walls. New devices may require cutting, patching, and painting of walls and it shall be the responsibility of the contractor to provide all cutting, patching and painting required for the installation of the Division 16 work. Contractor shall investigate existing areas prior to bid and shall include all costs of such work in the bid. This facility has wiring in raceways embedded in concrete slabs. Provide new concealed wiring to last outlet or pull box before homerun to panel. END OF SECTION 16051 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION SECTION 16100 PAGE 1 BASIC MATERIALS AND METHODS This section contains the general requirements for materials and installation methods which apply to all sections of Division 16 All materials and equipment shall be installed in conformance with the manufacturer's installation instructions and U.L. requirements. PART 2 PRODUCTS 2.1 GENERAL A. All materials to be new free from defects and not less than quality herein specified (except as permitted in Section 16051). Materials shall be designed to insure satisfactory operation and operational life in the environmental conditions which will prevail where they are being installed. B Each type of materials furnished shall be of the same make, be standard products of manufacturers regularly engaged in production of such materials and be the manufacturer's latest standard design. C All materials and equipment installed, including lighting fixtures, shall have been tested and listed by Underwriters Laboratories or other approved testing organization and shall be so labeled unless otherwise permitted by the Code Inspector (AHD) and the Architect. 2.2 SUBSTITUTION OF MATERIALS A. Listing of materials is not intended to prevent listing of other material provided the substitute product is submitted for listing and has been reviewed and listed in accordance with the following Substitution of Materials requirements. No Substitute: It is the intent of this specification to require new materials to be compatible with the existing installation and to this end certain materials and systems are indicated "No Substitute' and shall be provided as specified. 2. Listing Prior to Bid Opening: Listing of products other than those specified will be issued after the following requirements are met: Requests to be original material, clearly indicating the product fully complies with contract documents and be neatly marked with yellow felt tip marker to clearly define and describe the product for which listing is requested. Include certified laboratory test report for lighting fixtures. Samples shall be submitted if requested. Requests shall be received prior to 10 days before bid opening. Requests containing insufficient information to confirm compliance with contract documents will not be considered. 3 After Award of Contract: Substitution of products will be considered after award of contract only under the following conditions: a. The Contractor shall have placed orders for specified materials promptly after contract is awarded. b The reason Tor the unavailability is beyond the Contractor's control, i.e. due to strikes, bankruptcy discontinuance of manufacture, acts of God. MAHLUM NORDFORS McKLNNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.3 COMPLETE SYSTEMS 2.4 SUBMITTALS AND SHOP DRAWINGS D Submittals are required for Qualification Certificates Contract Cost Breakdown Raceways Cable Trays and Cable Rings Wire and Cables Cable Connectors Splicing Kits SECTION 16100 PAGE 2 BASIC MATERIALS AND METHODS c. Requests for substitutions shall be made in writing and shall be accompanied by complete description of the material or equipment. B. In all cases, should a substituted material result in requiring electrical system or building modifications; the Contractor alone shall pay all costs to provide these modifications including all costs to the Engineer and Architect for redesign time required to accommodate the required modifications. All the systems mentioned shall be complete in every detail and fully operational upon completion of the project unless specifically noted otherwise. Mention of certain materials in these specifications shall not be construed as releasing the Contractor from furnishing such additional materials and performing all labor required to provide complete and fully operational systems. A. Submittals: Within 30 days after award of contract, submit common brochure(s) with index and divider tabs by specification section, containing all required catalog cuts, to the Architect in a three ring binder with hardboard cover The data shall indicate listing by U.L. or other approved testing agency and contain sufficient information neatly highlighted with yellow or blue marker to demonstrate that the materials being submitted fully comply with contract documents. Each item submitted shall have been stamped "Reviewed and Approved' by the Contractor prior to review by the Architect. (Note: Submittals and shop drawings which are incomplete or which contain insufficient information will be returned for resubmittal.) See General Conditions for format, quantity etc. B Shop Drawings: Shop drawings shall be submitted as soon as available but not later than 45 days after award of contract. Shop drawings shall show the ratings of items and systems and how the components of an item or system are assembled, interconnected, function together and how they will be installed on the project. System layout drawings shall show floor plans with complete device layout and point -to -point wiring and connection diagrams between all components of the system. Show wire sizes and color coding. C. The contractor agrees that submittals and shop drawings processed by the Architect are not change orders; that the purpose of submittals and shop drawings by the Contractor is to demonstrate to the Engineer that the Contractor understands the design concept, that he demonstrates his understanding by indicating which equipment and material he intends to furnish and install and by detailing the fabrication and installation methods he intends to use. The Contractor alone accepts all responsibility for assuring that all materials furnished under this Division of the specifications meet in full all requirements of the contract documents. The Engineer's review is for general conformance with the design concept and contract documents. Markings or comments shall not be construed as relieving the Contractor from compliance with the project plans and specifications, nor departures therefrom. The Contractor remains responsible for details and accuracy for confirming and correlating all quantities and dimensions, for selecting fabrication processes and for techniques of assembly i 1 1 J 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Floor Boxes and Poke -Thru Devices Wiring Devices Motor Controllers Disconnects and Fused Switches Fuses Switchboard Modifications, Panelboards and Isolated Power Systems Lighting Filttures and Ballasts Fire Alarm w /AHJ approval indicated Elapsed Time Clocks Clock and Program Nurse Call Intercom Public Address Systems TV System Lighting Control E. Shop Drawings are required for Clock Systems Nurse Call Intercom TV System Public Address System Fire Alarm w /AHJ approval indicated Smoke Damper Control 2.5 NAMEPLATES A. Provide one job nameplate with the following information. Project Name (3/8' lettering, all other 1/4') Architect Electrical Consultant (Sparling, Inc.) Electrical Contractor Year of Manufacture B Panelboard Nameplates: Refer to Sections 16471 and 16660 C. Receptacle Nameplates: Refer to Section 16140 D Switch Nameplates: Refer to Section 16140 E. Motor Starter and Disconnect Nameplates: Refer to Sections 16160 and 16170 F Special Equipment Outlet Nameplates: Refer to appropriate Sections. G As shown on the drawings and details. SECTION 16100 PAGE 3 BASIC MATERIALS AND METHODS Provide permanently attached nameplates constructed of plastic (black on white) laminated material engraved through black surface material to white sublayer Exception. Emergency distribution system component labeling white letters on red background. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION 3.1 CUTTING BUILDING CONSTRUCTION 3.2 EXCAVATIONS A. Excavations shall not disturb or injure walls, footings or other property B. Remove all surplus earth not needed for backfilling and dispose of same as directed. 3.3 PENETRATIONS OF FIRE RATED ELEMENTS Must be provided such as to retain that rating. 3.4 PAINTING 3.5 CLEAN UP 3.6 WORKMANSHIP AND OBSERVATION SECTION 16100 PAGE 4, BASIC MATERIALS AND METHODS A. Obtain permission from the Architect and coordinate with other trades prior to cutting. Locate cuttings so they will not weaken structural components. Cut carefully and only the minimum amount necessary Cut concrete with diamond core drills or concrete saws except where space limitations prevent the use of such tools. B. All construction materials damaged or cut into during the installation of this work must be repaired or replaced with materials of like kind and quality as original materials by skilled labor experienced in that particular building trade. A. Painting in general will be covered under another Division of this specification, except items furnished under this Division that are scratched or marred in shipment or installation shall be refinished. B Exposed raceways and/or Wiremold (when allowed) in finished areas, shall be painted with two coats of oil based paint. Paint color shall match color of surface the raceway is attached to. Contractor shall continually remove debris, cuttings, crates, cartons, etc. created by his work. Such clean up shall be done daily and at sufficient frequency to eliminate hazard to the public, other workmen, the building or the Owner's employees. Before acceptance of the installation, Contractor shall carefully clean cabinets, panels, lighting fixtures, wiring devices, cover plates, etc. to remove dirt, cuttings, paint, plaster, mortar concrete, etc. Blemishes to finished surfaces of apparatus shall be removed and new finish equal to the original applied. A. Workmanship shall be of the best quality and none but competent and experienced electricians shall be employed and shall be under the supervision of a competent and experienced foreman. All completed work shall represent a neat and orderly appearance. B. All work and materials shall be subject to observation at any and all times by representatives of the Architect. 3.7 EQUIPMENT CONNECTION A. For equipment furnished under this or other Divisions of the specifications, or by owner provide complete all electrical connections necessary to serve such equipment and provide required control connections to 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS all equipment so that the equipment is fully operational upon completion of the project. Whenever the drawings show an equipment connection the Contractor shall provide the code required disconnect switch. B Prior to rough -in, obtain submittals and shop drawings for all equipment requiring electrical connections being furnished under other divisions of the specifications and by the owner Provide all wiring per the wiring diagrams and requirements indicated. 3.8 INTERFACE WITH OTHER TRADES SECTION 16100 PAGE 5 BASIC MATERIALS AND METHODS A. The Contractor shall continually interface and coordinate the electrical work with the work of other trades. B At each new and existing switchboard, panelboard and motor control center location the Contractor shall monitor the work of all trades to assure that the space and clearance requirements of code are met. END OF SECTION 16100 1 1 1 t t 1 t t 1 MAHLUM NORDFORS McICINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Provide all raceway systems complete and in conformance with code. PART 2 PRODUC'T'S 2.1 RIGID METAL CONDUIT (RGS) AND INTERMEDIATE METAL CONDUIT (IMC) A. Hot dipped galvanized steel. Fittings: Galvanized malleable iron or noncorrosive alloy threaded fittings compatible with galvanized conduit. Erickson couplings, watertight split couplings, similar to OZ/Gedney permitted. Set screw and running thread fittings not permitted. B. Wherever rigid galvanized steel conduit is specified, intermediate metal conduit is permitted unless noted or required otherwise. 2.2 ELECTRICAL METALLIC TUBING (EMT) A. Hot dip galvanized, electrogalvanized or sherardized, steel tubing. B. Couplings and Connectors: Raintight; steel or malleable iron type using a split corrugated compression ring and tightening nut or stainless steel locking disc. Steel set screw fittings are permitted. Indenter drive -on and pressure cast or diecast type fittings are not permitted. 2.3 FLEXIBLE METAL CONDUIT A. Galvanized, or zinc coated flexible steel for dry locations. Aluminum and flexible metallic tubing not permitted. Fittings: malleable iron or steel, similar to Thomas and Betts "squeeze" type. B Liquid Tight Flexible Metal Conduit. PVC weatherproof cover over flexible steel conduit. Fittings: similar to Thomas and Betts "Super Tite" 2.4 METAL SURFACE RACEWAY SECTION 16110 PAGE 1 RACEWAYS Formed steel type. Standard Factory painted finish. Where color choice is available, consult Architect for selection. Manufacturer Wiremold. 2.5 RIGID NONMETALLIC CONDUIT (PVC) Schedule 40 rigid polyvinyl chloride type, unless noted otherwise. Type EB permitted for underground rebar reinforced concrete duct banks. PVC elbows not permitted. 2.6 EXPANSION FITTINGS Malleable iron, hot dip galvanized allowing 4" 2') conduit movement. O Z/Gedney type AX series. 2.7 RACEWAY PENETRATION SEALS Thruwall and Floor Seals: New Construction OZ/Gedney FSK Series, existing construction OZ/Gedney CSM Series. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.8 RACEWAY SEALING FITTINGS PART 3- EXECUTION 3.1 GENERAL 3.3 ELECTRICAL METALLIC TUBING (EMT) SECTION 16110 PAGE 2 RACEWAYS For one through four conductors: OZ/Gedney CSB Series. For greater than four conductors: OZ/Gedney EYA Series with sealing compound. Low Temperature or Hazardous Locations: OZ/Gedney EYA Series with sealing compound. A. Provide raceways concealed in construction unless noted otherwise or unless specifically authorized by the Architect. B. Supports, bending, reaming and threading of raceway shall conform with code. 3.2 RIGID METAL AND INTERMEDIATE METAL CONDUIT All connections watertight. Shall be used for 1) all raceways where subject to damage, 2) all stubups in concrete, 3) all stubouts through concrete walls or from slabs, 4) where exposed to weather Provide for wiring in masonry or frame construction and for wiring in furred ceilings and above suspended ceilings. May be used for exposed work in unfinished areas where not subject to damage. Where construction involves masonry work, assemble and install at the same time as the wall is erected. Avoid surface cut masonry units wherever such masonry units are to remain unplastered or uncovered in completed construction. EMT not permitted to be encased in concrete slabs. 3.4 FLEXIBLE METAL CONDUIT Provide flexible raceway connection with 90 degree loop minimum for isolation to 1) motors 2) transformers and 3) to all other equipment subject to vibration, (i.e. control equipment, such as solenoid valves, pressure controls, aquastats, pneumatic electric relays, etc.). Provide liquid tight for pumps, for equipment in areas which are regularly washed down, and for equipment in damp or wet locations. Provide code bonding juniper 3.5 METAL SURFACE RACEWAY Verify exact mounting and locations with Architect prior to rough -in. Install parallel to a building surface (i.e. wall, ceiling, floor). Fasten to surface as recommended by manufacturer Mount so raceway is in the least obvious location. Ream all cuts smooth. Provide all required boxes, extensions, fittings, elbows and devices for a complete installation. Provide bushings in ends of Wiremold 500 and 700 runs at all boxes and devices. 3.6 RIGID NONMETALLIC CONDUIT A. When permitted by code, may be used underground, or where completely encased with 2" of concrete (or as required by code). Exception. Use rigid steel for elbows, penetrations through floors and walls and stub ups. Raceway size may need to be increased to include code required ground wire. Provide expansion joints per code. Field bends limited to less than 44 degrees, formed with manufacturer's recommended heater B Fire alarm and clock systems in raceway shall be in steel raceway 1 1 1 1 1 9 1 r 1 1 1 l i 1 f i r r t 1 1 1 t 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS C. Non metallic conduit shall not be used in patient care areas. 3.7 RACEWAYS UNDERGROUND SECTION 16110 PAGE 3 RACEWAYS A. Rigid galvanized steel with a 15 mil. PVC jacket (repair abrasions with two coats PVC base paint). Option. Two applications of Scotchrap primer and 51 tape, 1/2 lapped, each application. Rigid nonmetallic raceways may be used where permitted by code unless noted otherwise. B. Arrange and slope raceways entering building to drain away from building. C. Provide marker tape over underground raceways. Marker tape to read "Caution Electric Line Buried Below" as manufactured by Terra Tape or accepted equal. Install 1 -0" below grade. D Install underground raceways a minimum of 24" below final grade (36" on public property) unless otherwise noted or required. E. Provide backfill around underground raceways. Use clean sand 6" above and below raceways. Backfill above 6" shall be free of debris or rocks greater than 1 in diameter Space raceways 7 -1/2" minimum between centers and 3" minimum between raceways. F Anchor raceways encased in concrete to prevent floating during pour 3.8 RACEWAYS THAT STUB UP THROUGH FLOOR Install at such depth that the exposed raceway is vertical and no curved section of the elbow is visible. 3.9 RACEWAY PENETRATION SEALS A. Exterior wall surfaces above grade: Provide watertight seal around all raceways. For concrete construction above ground level, cast raceway in wall or core drill wall and hard pack with a mixture of equal parts of sand and cement. For other types of construction use method acceptable to Architect. B Exterior surfaces below grade: Provide watertight seal around all raceways. Cast raceway into wall (or floor) or use manufactured seal assembly C. Roofs: Provide flashed and hot mopped weatherproof seal, or a pitch pan filled and sealed to be weatherproof where raceway penetrates roof membrane. Provide a weatherhead on all raceway stubups penetrating roof. D Fire rated construction. Seal penetrations to maintain fire rating of construction penetrated. Caulk around penetration with Thomas Betts Flame -Safe Compound, 3M Fire Barrier Caulk, Nelson Electric Flameseal or Dow Corning Silicone RTV foam. Install as recommended by manufacturer 3.10 RACEWAYS SEALING FITTINGS A. Provide watertight seal in the interior of all raceways which pass through building roof, ground floor slab or through outside walls of the building above or below grade. Seal on the end inside the building, using raceway sealing fittings manufactured for the purpose. Seal poured type fittings with a non hardening compound manufactured for such service. 3.11 RACEWAYS SUPPORTS A. See section 16190 MAIILUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.12 PULL CORDS A. Provide a pull cord in all raceways for communications and telephone systems. B. In other raceways, provide a nylon pull cord in those which are left empty at end of the project, greater than 25 feet in Length. 3.13 PROXIMITY TO HIGH TEMPERATURE SURFACES Maintain 12" minimum clearance. 3.14 RACEWAY FILL 3.15 EXPANSION FITTINGS SECTION 16110 PAGE 4 RACEWAYS Raceways not sized on the drawings shall be sized per NEC Table 3A. Raceways for signal and communications systems shall be sized per the shop drawings and code. Provide expansion fittings for raceways crossing expansion joints, building separation walls, and seismic joints. Provide bonding jumper END OF SECTION 16110 1 1 1 1 1 i i 9 i 1 1 1 1 1 t 1 r 1 1 i 1 1 1 i t MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION SECTION 16114 PAGE 1 CABLE TRAYS Provide cable tray at locations shown on the drawings to permit installation of telephone, computer dictation, intercom, television distribution system cables and other low voltage system cables. 1.2 CONTRACT DOCUMENTS AND EXISTING CONDITIONS Examine drawings and existing conditions above ceiling spaces and include bends and offsets in bid price to avoid ducts, pipes, conduits, etc. Installation in existing ceiling is very difficult and contractor shall include extra labor time involved in the bid price. PART 2 PRODUCTS 2.1 GENERAL A. Conform with NEMA VE -1 6" wide, flange -in, steel, trough type, with 3 -3/8" high (minimum) side rails, 1/2" rolled edges and rung openings to match existing. Chalfant, P W Husky or Cope. B. Finish shall be manufacturer's standard mil finish. C. Structure of trays shall be suitable to support a continuous loading of cables weighing 75 lbs. per lineal foot when supported on 8' centers without any deflection exceeding 1/130 part of the span with a safety factor of 1.50 D Interior surfaces shall be smooth and free of offset edges, projections or misalignment. Assembly bolts for end to end connections shall have a pattern which does not cause any damage to cable sheaths of jackets. All edges shall be smooth, de- burred. E. Accessories and special transitions shall be provided for all changes in direction and offsets. Use manufacturer's standard fittings including bolting assemblies for all end to end connections. 2.2 SUPPORTS A. Wall brackets shall be steel, hot dip galvanized. Modify length of brackets before galvanizing so end will not project beyond front edge of tray Ends to be smooth without hooks or projections. Brackets shall be able to support an end load of 600 lbs with a safety factor of 1 65 B Single Channel Hangers shall be formed steel type with galvanized or painted finish. PART 3 EXECUTION 3.1 GENERAL A. Support cable tray from wall or ceiling brackets spaced six foot on center maximum. Provide additional brackets on ends, and two additional brackets at tees and corners. Securely fasten tray to brackets using clamps manufactured for the purpose. B Mount bottom of tray approximately 8" above suspended ceilings. Coordinate with building construction and other trades and with height of existing tray MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 HANGER BRACKETS SECTION 16114 PAGE 2 CABLE TRAYS A. Single Channel Hanger brackets shall be provided at locations where wall brackets are not suitable for installation. Attach brackets to structural ceiling using 1/2" threaded steel rods. Spacing not to exceed six foot centers. B. Provide sway bracing in two directions at 12 -0' on center 3.3 COORDINATION Coordinate installation of cable tray with mechanical ductwork and sprinkler system piping so that tray remains accessible (minimum 1 foot clear above tray bottom) after installation. Coordinate exact routing with all trades to avoid interferences. 3.4 GROUND CABLE Provide a #6 bare ground cable the length of tray Bond to tray every 6' -0" minimum using clamps manufactured for the purpose. Extend to building ground or bond. 3.5 CABLE TRAY AT SEISMIC JOINT Where cable tray crosses building seismic joint, provide minimum 6' gap between sections at cable tray Install cable rings on each cable tray Install cable rings on each side of seismic joint to support cable. Provide braided grounding strap with 6' slack to bond sections of tray on either side of joint. END OF SECTION 16114 t t 1 1 i t I t MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 DESCRIPTION Provide cable rings in corridors C103 C105 C106, C107 C108, C201, C202, C203 C204 C205 to permit installation of telephone, computer, television distribution system cables and other low voltage cable systems. 1.2 CONTRACT DOCUMENTS AND EXISTING CONDITIONS Examine drawings and existing conditions above ceiling spaces and include all work required for installation in bid price to avoid ducts, pipes, conduits, etc. Installation in existing ceiling spaces is very difficult and contractor shall include extra labor time involved in the bid price. PART 2- PRODUCTS 2.1 CABLE RINGS 5" diameter lay in pipe hanger on 3/8' threaded steel rods. 2.2 WALL BRACKETS Steel, hot dip galvanized as designed for cable tray support. PART 3 EXECUTION 3.1 CABLE RINGS Provide cable rings spaced 4 feet apart on center and at each change of direction of the cables. Locate rings a maximum of 1 foot above the ceiling and hang rings from 3/8" all threaded rods or wall brackets. attached to ceiling metal inserts or to structural members. 3.2 COORDINATION SECTION 16115 PAGE 1 CABLE RINGS Coordinate installation of cable rings with mechanical ductwork and sprinkler system piping so that rings remain accessible after installation. Coordinate exact routing with all trades to avoid interferences. 3.3 PENETRATIONS OF BUILDING FIRE ELEMENTS Where cables on cable rings penetrate building fire separations, provide EMT sleeve and seal penetration with a U.L. listed fire retardant silicone foam (CTC PR 855) or 3M Fire Seal Caulk. Seal penetration only after telephone cables and all other system distribution cables have been installed. END OF SECTION 16115 1 1 r r r 1 t 1 1 1 1 1 1 t MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Provide all conductors, splices and terminations, complete. B. Refer to Section 16700 and specific sections following for limited energy wiring and conductors. PART 2 PRODUCTS 2.1 POWER CONDUCTORS A. Copper 600V insulation, UL labeled, brought to project in original containers. aluminum conductors not permitted. B Interior and above grade: All conductors to be type THW or RHW Type conductors may be utilized at Contractor's option, subject to code requirements. stranded, #10 and #12 solid. C. Underground. Rome -XLP type USE/RHW insulation or equal. Exception. completely contained in code recognized raceway and boxes may be type THW OF direct burial not permitted unless shown on the drawings. D Conductor insulation color code: 2.2 SPLICES 208Y/120V A- Black, B -Red, C -Blue, N- White, G- Green. 480Y/277V A- Brown, B- Orange, C Yellow N- Natural Grey G- Green. Colored tape acceptable on #8 and larger Tape 3 at ends. SECTION 16120 PAGE 1 CONDUCTORS AND TERMINATIONS COPPER ONLY Aluminum or copper clad THWN/THHN or XHHW Conductors #8 and larger Underground conductors THWN or XHHW Type A. Above Grade: Solderless type. Preinsulated "twist -on" type (limited to size #10 and smaller). Bolt or compression set type with application of preformed insulated cover heat shrinkable tubing or plastic insulated tape acceptable for all sizes. B Below Grade: Provide in handholes with watertight epoxy resin type splicing kits similar to Scotchcast. 2.3 TERMINATIONS A. Compression set, bolted or.screw type lug or direct to bolted or screw type terminal. B Conductors #12 and smaller Provide eye or forked tongue compression set terminator at bolted or screw set type terminal block or terminal cabinet. 2.4 PLASTIC CABLE TIES Nylon or equivalent, locking type. 2.5 CONDUCTOR LABELS Labels shall include panel and circuit number and be covered by `shrink wrap' clear plastic. Hand lettered label will not be accepted. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION 3.1 GENERAL A. Install conductors in raceway unless shown or specifically authorized otherwise. SECTION 16120 PAGE 2 CONDUCTORS AND TERMINATIONS COPPER ONLY B. Conductors from' one system shall not be intermixed in same raceway as another system unless shown in same raceway Examples of circuits not to be intermixed are 480/277 with 208/120, emergency power with normal power 120V with low voltage, intercom with nurse call, etc. C. Install splices and terminations in enclosures as required or shown. D Tape ends of future circuit conductors in each enclosure. 3.2 CONDUCTOR SIZE Number 12 AWG minimum for power and lighting circuits. 3.3 CONDUCTOR SIZES SHOWN ON DRAWINGS Copper, type THW unless noted. Aluminum conductors not permitted. 3.4 RACEWAY SIZES SHOWN ON DRAWINGS Raceway sizes (when shown) are for THW copper conductors unless shown otherwise. Size raceways per code unless specifically shown larger on drawings. 3.5 TAPING, if used, shall be half lapped synthetic tape. 3.6 CONDUCTORS IN PANELS, SWITCHBOARDS AND TERMINAL CABINETS Install neatly grouped and formed in a manner to "fan' into terminals with regular spacing. 3.7 CONDUCTORS SUPPORTS Provide conductor support devices per code in vertical cable runs. 3.8 CONDUCTOR LABELS Label conductors at each end and in any intermediate junction boxes. END OF SECTION 16120 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION SECTION 16130 PAGE 1 OUTLET, JUNCTION AND PULL BOXES Provide outlet, junction and pull boxes as required to enclose devices, permit pulling conductors and for wire splices and branches. 1.2 MOCK UPS Provide outlet boxes with device plates for patient care wall mock -ups. Coordinate layout of boxes in one location of each typical patient care area. Install device plates for Owner review Install actual or mock- up wall light fixtures. Install actual nurse call pillow speaker including pillow speaker hanger for purposes of coordination in mock -ups. Adjust box locations as requested by Owner Install other typical patient care area device boxes in accordance with approved mock -ups. See Section 01010 for additional requirements. PART 2- PRODUCTS 2.1 INTERIOR WIRING A. General. Outlet and pull boxes shall be pressed steel, zinc coated with plaster ring where applicable. Large junction and pull boxes shall be fabricated sheet steel, zinc coated or baked enamel finish, with return flange and screw retained cover B Metal Surface Raceway Boxes of same manufacture and to match raceway Boxes to accommodate standard devices and device plates. C. Concrete and Masonry Boxes for casting in concrete or mounting in masonry walls shall be specifically designed for that purpose. 2.2 EXTERIOR WIRING A. Above Grade: Outlet and junction boxes shall be cast or malleable iron or shall be cast of corrosion resistant alloy complete with conduit hubs, compatible with raceway to which it is connected. Pull boxes shall be fabricated of heavy gauge steel and hot dipped galvanized complete with malleable iron hubs. All boxes shall be labeled for damp or wet locations as applicable. B Below Grade: Where exposed to earth, boxes (handholes) shall be constructed of precast concrete with size, configuration, cover, grates and reinforcing as required by the particular installation. Manufacturer Utility Vault or Renton Concrete Products. Where not exposed to earth shall comply with 2.2A above. PART 3 EXECUTION 3.1 ANCHORING All boxes shall be firmly anchored directly or with concealed bracing to building studs or joists. Boxes must be so attached that they will not "rock' or "shift" when devices are operated. 3.2 FLUSH MOUNTING A. All boxes shall have front edge (box or plaster ring) even with the finished surface of the wall or ceiling, except for those mounted above accessible ceilings or where drawings indicate surface mounting is permitted. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Switches 4 feet, set vertically Receptacles 18 inches, set vertically or as indicated. Telephone 18 inches, set vertically or as indicated. Other As noted or as directed by Architect. 3.4 LIGHTING FIXTURES 3.5 ELECTRICAL WORK IN COUNTERBACKS, MILLWORK AND CASEWORK 3.6 CONNECTION TO EQUIPMENT SECTION 16130 PAGE 2 OUTLET JUNCTION AND PULL BOXES B. Flush mounted boxes on opposite sides of a common wall shall not be mounted back -to -back. Provide 0'- 6" minimum horizontal separation between closest edges of the boxes. Option. Use other sound proofing method acceptable to Architect. 3.3 ELECTRICAL OUTLETS A. General. Coordinate the work of this Section with the work of other Sections and trades. Study all drawings that form a part of this contract and confer with the various trades involved to eliminate conflicts between the work of this Section and the work of other trades. Check and verify outlet locations indicated on Architectural drawings, door swings, installation details and layouts of suspended ceilings and locations of all plumbing, heating and ventilating equipment. B. Centered on Built -In Work: In the case of doors, cabinets, recesses or similar features, or where outlets are centered between two such features, such as between a door jamb and a cabinet, make these outlet locations exact. Relocate any outlets which are located off center C Vertical and Horizontal Relationships: Where more than one outlet is shown or specified to be at the same elevation or one above the other align them exactly on center lines horizontally or vertically Relocate as directed all such outlets (including lighting, receptacle, power, signal and thermostat outlets) which are not so installed, at no additional cost to Owner D Device Outlet Height: Measure from the finished floor to the center line, unless otherwise noted or shown on architectural elevations. E. Ceiling Location. For acoustical material locate outlet either at the corner joint or in the center of a panel, whichever is closer to the normal spacing. Locate all outlets in the same room in same panel position. In ceilings of Acoustical Material. Locate in accordance with approved ceiling layout plans and so that fixtures replace full size ceiling tiles wherever possible. Provide as shown and/or specified. Provide templates, where required, to other trades for drilling and cutting to insure accurate location of electrical fixtures (outlets and devices) as verified with the Architect. Provide all wiring, devices, plates and connections required by said fixtures. For equipment furnished under this or other Divisions of the specifications, or by others; provide outlet boxes of sizes and at locations necessary to serve such equipment and provide final connections to all equipment. Outlet box required if equipment has pigtail wires for external connection, does not have space to accommodate circuit wiring or requires a wire with insulation rating different from circuit wiring used. Study equipment details to assure proper coordination. 1 1 t r t i t 1 t 1 1 i 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS 3.7 BLANK COVERS Provide blank covers or plates over all boxes that do not contain devices or are not covered by equipment. 3.8 DEVICE BOXES CONTAINING EMERGENCY AND NORMAL DEVICES Provide bbx with steel barrier manufactured especially for the purpose of dividing the box into two completely separate compartments. 3.9 DEVICE BOXES CONTAINING MULTIPLE DEVICES AND WIRING RATED OVER 150 VOLTS TO GROUND AND OVER 300 VOLTS BETWEEN CONDUCTORS Provide box with steel barrier manufactured especially for the purpose of dividing the box into separate compartments for each device having exposed live parts. 3.10 JUNCTION OR PULL BOXES A. Pull and junction boxes shall be installed as shown, or as necessary to facilitate pulling of wire and to limit the number of bends within code requirements. Boxes shall be permanently accessible and shall be placed only at locations approved by the Architect. B Conductors from one system shall not be intermixed in same junction box or pull box as another system unless shown or specifically authorized otherwise. C. In suspended ceiling spaces shall be supported from structure independently from ceiling suspension system D The drawings do not necessarily show every pull or junction box required. The Contractor shall add all boxes required. 3.11 ELECTRIC WATER COOLERS Conceal the electrical outlet behind the unit housing when provided for by manufacturer 3.12 BOXES IN EARTH Provide for all wire splices and as required to pull conductors. Boxes (handholes) smaller than 3 -0' x 3'- 0' shall be set in place on a 3 sand or pea gravel bed. Larger boxes shall have 6" bed. Coverplates shall be flush to, and match the slope of, the final surface grade. 3.13 COLOR CODING A. All junction boxes installed in accessible ceiling spaces and exposed in unfinished areas shall be color coded using spray paint on the box and cover as applicable in the following manner. 480 Power Brown Telephone Black 277V Lighting Yellow Nurse Call Lt. Blue 120/208V Unpainted Public Address Silver Emergency Power Orange Television Gold Clock Program Green Intercom White Fire Alarm Red SECTION 16130 PAGE 3 OUTLET JUNCTION AND PULL BOXES B Following painting use black permanent felt tip marker to indicate the circuit numbers contained within. END OF SECTION 16130 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 DESCRIPTION Provide all wiring devices and plates complete and fully operational. PART 2 PRODUCTS 2.1 MANUFACTURE Wiring devices shall be the product of a nationally recognized manufacturer regularly engaged in manufacturing such products. 2.2 COLOR A. Ivory material for switch handles and receptacle faces except as follows; 1 Brown in areas selected by Architect (verify). 2. Red for emergency circuits. 3 Other colors as noted. B Plates shall be as specified below and as noted. 2.3 SWITCHES 2.4 DIMMERS 2.5 RECEPTACLES B Interchangeable type shall be rated same as above. D Pilot light switches: Lighted handle when "ON' or with separate pilot light. SECTION 16140 PAGE 1 SWITCHES AND RECEPTACLES A. "Specification Grade" Federal Specification WS -896, back and side wired, rated 277 volt, 20 amp. Provide single pole, double pole, keyed, 3 -way pilot light, locking type or as required or as noted. Provide matching styles and color in other devices as required for the conditions of installation. Arrow Hart 1991 -I, Bryant 4901 -I, Eagle 2221V General Electric GE 5951 2G, Hubbell 1221 -I, Leviton 1221 -I, Pass Seymour 20AC1 -I. C. Momentary Contact Line Voltage Switches: Single pole, double throw 3 -wire, spring return to open. Rating same as above. A. Fluorescent Preset Dimmers: Shall be compatible with the fluorescent dinning ballasts installed in the fixtures to be controlled, shall fit in a standard GFCI type wall plate, shall have a preset off control, shall be capable of being controlled by multiple remotes, and shall gang with other standard switches and receptacles utilizing standard faceplates. Leviton 6661 -P1I, Lightolier ZP600F or ZP1000F Series, Lutron Maestro Series. A. Hospital grade (15 amp), Duplex NEMA 5 -15R configuration (15 amp, 120 volt). Federal Specification WC -596F Arrow Hart 5226 -HGI, Bryant 8200 -I, Eagle 8200V General Electric 8200 -2, Hubbell 8200HI, Leviton 8200 -I, Pass Seymour 9200 -HGI. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16140 PAGE 2 SWITCHES AND RECEPTACLES B Hospital Grade (20 amp), Duplex NEMA 5 -20R configuration (20 amp, 120 volt), Federal Specification WC -596 F Arrow Hart 5326 -HGI, Bryant 8300 -I, Eagle 8300V General Electric 8300 -2, Hubbell 8300HI, Leviton 8300 -I, Pass Seymour 9300 -HGI. C. Specification Grade, Duplex NEMA 5 -15R configuration (15 amp, 120 volt), Federal Specification WC- 596F back and side wired, unless shown otherwise: Arrow Hart 5252 -I, Bryant 5252 -I, Eagle 5252V General Electric 5252 2, Hubbell 5252-1, Leviton 5252 -I, Pass Seymour 5252 -I. D Clock Receptacle: NEMA 5 -15R with hanger bracket. Flush Type: Hubbell 5235 Recessed Type: Leviton 5361 -CH, or equivalent by manufacturer listed is 2.5A. E. Twist Lock: NEMA L5 -20R configuration (20 amp, 120 volt, locking type) Hubbell 2310A, or equivalent by manufacturer listed in 2.5A. F Isolated Ground. Hospital Grade, NEMA 5 -15R configuration orange face and isolated ground terminal. Hubbell IG 8200 or equivalent by manufacturer listed in 2.5A. G. Safety Receptacles: Safety type receptacles for designated areas shall be hospital grade, cross shunting type to make it necessary for both plug blades to be inserted to complete a circuit. NEMA 5 -15R configuration. Hubbell #SG62HI, General Electric GE8200 -T2, Leviton 5262 -SGI, Arrow Hart 6352 -I. Safety receptacles are the same as tamperproof receptacles. H. Ground Fault Receptacles: Hospital grade duplex receptacle with 4 6 milliamps leakage current trip level. Ivory color Hubbell HGF- 8200I, Pass Seymour 1591 -SHG, Leviton 6598 -HGI, Arrow Hart GF8200 -I. I. 208 Volt Receptacles: NEMA 6 -20R configuration (20 amp, 208 volt) unless otherwise indicated. Hubbell #5462 -I or equivalent by manufacturer listed in 2.5A. 2.6 DEVICE PLATES A. Interior• Plates for receptacles other than 15 and 20A, 120V shall have the plate engraved or separate nameplate with ampere rating, voltage and phase indicated. Plates for recessed boxes shall be stainless steel with Sierra type 302 satin stainless finish. Attachment screws shall match finish of plate. Plates for surface mounted boxes shall be of pressed steel sized to fit exactly box used. B Exterior Bell #RCH1 -GFR, Pass Seymour 4511, Hubbell CWP 26H (horizontal mounting) for GFCI duplex receptacles. Where horizontal mounting is not possible provide Bell #RCV1 -GFR, Pass Seymour 4512 or Hubbell WP26 For receptacles other than 15A and 20A provide weatherproof cover to match receptacle. C. Engraving Branch Circuit Designation Device Plates: 1 Emergency receptacle device plates shall be engraved "Emergency" above the receptacle with the panelboard and circuit number supplying them engraved below the receptacle. Engraving shall be approximately 1/4" high, red filled characters. 2 Normal receptacle coverplates in Critical Care Areas as defined in the NEC, (including patient rooms, O.R. recovery and pre -op) and shall have the circuit number supplying them engraved below the receptacle with 1/4" high, black filled letters. 3 The electrical contractor shall be responsible to have faceplates on all owner furnished equipment and equipment furnished under other divisions engraved with circuit number panelboard and "emergency" (where applies) as specified in this section. This includes but is not limited to: headwalls, patient consoles, custom casework with electrical devices, etc. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS 4 Where existing receptacles circuiting has been revised, provide new faceplate with correct circuit identification. D Engraving Switch Faceplates: All switches which do not control lights within the same room as the switch, shall be engraved to indicate light or device controlled. 2.7 MULTIOUTLET ASSEMBLY Provide assemblies complete, including necessary fittings and hardware with circuits as indicated on drawings. Outlet spacing shall be as indicated except that a receptacle shall be located within 0' -8" of each end and no receptacles shall be installed over sinks. All assemblies shall contain green ground wire. Provide 040" thick steel assembly with standard factory ivory painted finish. Wiremold 20GBA 12 series where simplex receptacles are indicated, Wiremold 3000 series where duplex devices are indicated or equivalent by Walker 2.8 CORD CAPS (PLUGS) A. Provide hospital grade cord caps for all 120V cord connected equipment provided or installed under this contract. Hubbell 8215C, Pass Seymour 5266 -XHG, or Leviton 5266 HGN, Arrow Hart 5266NHG. B. Provide cord caps for all receptacle configurations other than NEMA 5 -15R and 5 -20R to match type of receptacle installed. 2.9 LOW VOLTAGE CONTROL See Section 16930 PART 3 EXECUTION 3.1 MOUNTING Rigidly fasten (without play) each outlet box and each device to the outlet box at proper position with the wall to bring receptacle flush with plate or switch handle the proper distance through the plate. All devices and plates shall be aligned to be plumb vertically Plates which are over tightened so corners have play are not acceptable. 3.2 ORIENTATION 3.3 DEVICE PLATES SECTION 16140 PAGE 3 SWITCHES AND RECEPTACLES Set switches with handle operating vertically up position "ON" Set receptacles vertically with ground pin up or when construction requires horizontal mounting with ground pin left. A. Provide for each new wiring device and for each telephone and signal equipment outlet. Plate shall completely cover the cutout for the device outlet box. B For remodel projects or for additions to existing construction provide new plates on existing outlet boxes unless the existing plate matches new plates in construction and appearance. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.4 MULTIOUTLET ASSEMBLIES 3.5 RECEPTACLES` B. Provide safety receptacles in the locations shown on the drawings. SECTION 16140 PAGE 4 SWITCHES AND RECEPTACLES Rigidly fasten assemblies and raceways to the cabinet, wall, casework, or modular casework as indicated. Provide a chase nipple extension between• outlet box in the wall and the raceway when the raceways are mounted to the support channels for the modular casework. A. Hospital Grade: Provide hospital grade receptacles in all patient care areas, operating rooms, patient corridors, work rooms, equipment rooms, utility rooms, patient preparation rooms, exam rooms and nurses stations. Provide 15 amp receptacles in all locations except provide 20 amp receptacles on dedicated 20 amp circuits. C. Provide weatherproof GFCI receptacle within 25' -0' of each roof mounted mechanical equipment, for all outdoor receptacles, and other locations shown on the drawings. END OF SECTION 16140 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Scope of work under this Section includes all requirements for motor controllers (starters; to be provided and/or installed under this contract. Motor controls shall conform to NEMA standards for each specific purpose aitd be U.L. listed. B The Contractor performing the Division 16 work shall furnish motor controllers for all motors shown unless the controllers are included with the equipment furnished under other divisions of these specifications. The contractor performing the Division 16 work shall install all motor controllers including all controllers not factory assembled into equipment furnished under other divisions of these specifications or by Owner All motors and motor controllers shall be complete and fully operational upon completion of the project. 1.2 MOTOR VOLTAGE INFORMATION PART 2 PRODUCTS 2.1 MOTOR STARTERS A. Magnetic motor starters: Shall conform to or contain items called for below and unless noted otherwise, shall be full voltage non reversing for NEMA size 3 and under Starters larger than NEMA size 3 shall be closed transition, autotransformer or wye -delta type. No starters smaller than NEMA size 0 and no half size starters are permitted. Wye -delta type must have motor designed for this use. Contractor is responsible for coordination. Conductors and terminations shall conform with 16120 B Overload devices: Shall be melting alloy or bimetallic type. One overload shall be provided for each phase. Provisions shall be made for resetting the overload devices from outside the starter enclosure. Provide ambient compensated overload devices only when the motor is at a constant temperature and the controller is subject to a separate, varying temperature. Automatic reset overload devices are not permitted. C. Accessories: Each magnetic motor controller shall include phase loss protector, 'HAND -OFF- AUTO" selector switch, 120 volt coil (unless noted otherwise), red running pilot light, green off pilot light, 100VA (minimum) control transformer (except for 115 volt motors), surge suppression kit, with fused primary and secondary two spare auxiliary interlock contacts and all other accessories required or noted. SECTION 16160 PAGE 1 MOTOR CONTROLLERS Voltages available are 208 and 480 volt three phase; or 120 208 and 277 volt single phase. Circuits are designed (in general) for motors with voltage ratings as follows: Smaller than 1/2 HP 115 volts, single phase. 1/2 HP and larger 200 or 460 volts, three phase. Obtain submittals and shop drawings and verify motor sizes and voltages provided under other Divisions prior to commencing work. D Enclosures: All motor controllers shall be contained in an enclosure suitable for the environment in which the controller is mounted. Shall be NEMA 3R when exposed to weather Other enclosures shall be per code or as noted. E. Combination motor controller Shall be fused switch type (Class RK5), or motor circuit protector type rated for 22,000 RMS A.I.C. minimum unless noted otherwise and containing all accessories as listed above. If externally powered control circuits are used, provide an auxiliary switch on the disconnect MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS switch or protector and fuse in lieu of the control transformer Switch or protector shall be capable of being padlocked in the off position. F Manual Starters: Shall be toggle switch 'type, lockable in the "off" position, with overload relays, pilot light and enclosure per above. 2.2 MANUFACTURER Allen Bradley General Electric, Square D Westinghouse, Cutler Hammer 2.3 NAMEPLATES Provide engraved phenolic nameplates per Section 16100 Permanently attach (with mechanical fasteners) on each controller, nameplates with the following information. load and area served, voltage, phase, fuse size and type (when applicable) and circuit serving controller 2.4 FAN SHUTDOWN RELAYS Contractor shall provide relay(s) with sufficient contacts to shutdown all fans over 2000 cfm upon receipt of fire alarm. See Section 16721 Coordinate relay coil voltage with fire alarm system supplier 2.5 POWER FACTOR CORRECTION Provide power factor correction capacitors for all motors 25 horsepower and above. Capacitor size when shown is an approximation only Final size shall be determined by the contractor based on the recommendations of the motor manufacturer to bring the power factor to between 0 9 and 0 95 All capacitors are to be fused, with blown fuse indicators mounted on the front of the unit. Capacitor units shall include discharge resistors. PART 3 EXECUTION 3.1 WIRING A. Wiring shall conform to applicable sections of these specifications. Provide wiring from branch circuit overcurrent device to motor controller to motor terminals, including installation of starter and all connections. B. Motor controllers provided under Division 16 shall be combination type. Where starters furnished under other Divisions of the specification or by Owner do not include an integral disconnect switch, a separately mounted disconnect switch shall be provided. C. Provide raceway and conductors as shown for remote control, or interlock connections. Coordinate other control wiring with Division 15 of the Specifications. D Provide overload elements in controllers sized to match motor nameplate full load amperes. E. Space within controllers shall not be used as a junction box. 3.2 SUPPORTS SECTION 16160 PAGE 2 MOTOR CONTROLLERS Securely mount to equipment, wall or acceptable mounting frame suitable to withstand earthquake forces. Controllers supported only by raceways are not acceptable. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.3 FAN SHUTDOWN WIRING SECTION 16160 PAGE 3 MOTOR CONTROLLERS Provide 1/2 raceway with 2 #14 AWG conductors from each fan motor controller to the fire alarm shutdown relay(s). Provide wiring of interlock connections for all (over 2000 CFM) fan starter control circuits via Division 16 furnished fan shutdown relay to shutdown fans upon receipt of fire alarm. END OF SECTION 16160 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 DESCRIPTION 3.3 SPLICES SECTION 16170 PAGE 1 DISCONNECTS AND FUSED SWITCHES Provide all disconnects, fused and unfused, required by code for equipment furnished under this and other Divisions of these specifications and by Owner a PART 2 PRODUCTS 2.1 DISCONNECTS A. Switch shall be heavy duty type, shall be quick -make, quick -break and shall be horsepower rated. Exception. Toggle switches with padlocking provisions are acceptable when applied within their rating. Switch shall have blades as required to open all ungrounded conductors and shall be single throw unless noted. Conductors and terminations shall conform with 16120 B Enclosure shall have interlocking cover to prevent opening door or removal when switch is closed. Door interlocks shall include a defeating scheme. Shall be padlockable in the "off" position. C. Enclosure shall be suitable for the environment in which mounted. Shall be NEMA 3R when exposed to weather Other enclosures shall be per code or as noted. 2.2 FUSED SWITCHES (OR FUSED DISCONNECTS) Shall be as above with addition of fuse space and clips to accept only Class R fuses. 2.3 MANUFACTURER General Electric, Westinghouse, Square D Gould ITE, GTE Sylvania, Cutler Hammer 2.4 NAMEPLATES Provide engraved phenolic nameplates per Section 16100 Permanently attach (with mechanical fasteners) on each a nameplate with the following information. load and area served, voltage and phase, disconnect fuse size and type (when applicable) and circuit serving disconnect. PART 3 EXECUTION 3.1 WIRING Wiring shall conform to applicable sections of these specifications. Location of motor disconnects shall be per code. 3.2 SUPPORTS Securely mount to equipment, wall or acceptable mounting frame. Disconnects supported only by raceway are not acceptable. Wiring space within Disconnects or Fused Switches shall not be used as a junction box. MAHLUM NORDFORS MCHINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.3 FUSES Coordinate fuse size with equipment provided under other sections and by Owner a SECTION 16170 PAGE 2 DISCONNECTS AND FUSED SWITCHES END OF SECTION 16170 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.1 DESCRIPTION Provide fuses sized per code as required for systems to be complete and fully operational. PART 2 PRODUCTS 2.1 FUSES A. Current limiting, U.L. Class R rejection type or Class L unless noted otherwise. B 600 Amp and less: Class RK1 except motor circuits Class RK5 C. Over 600 Amp: Class L. D Manufacturer Bussmann, Gould, Littelfuse. 2.2 SPARE FUSES Provide 10% spare fuses, but not less than three (3) of any one size and type. 2.3 SPARE FUSE CABINET Provide spare fuse cabinet sized for required spare fuses. Cabinet front and lock to match panelboard equipment specified elsewhere in this Division. PART 3 EXECUTION 3.1 FUSES Install in fusible devices. 3.2 SPARE FUSE CABINET Locate per Owner's direction. SECTION 16180 PAGE 1 FUSES ,END OF SECTION 16180 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1 Equipment supports. 2. Raceway supports. 3 Light fixture supports. 4 Anchors and fasteners. B. Work Furnished But Installed Under Other Sections: SECTION 16190 PAGE 1 SUPPORTING DEVICES 1 Furnish hanger and support inserts, sleeves to Division 3 Contractor for placement into formwork. 1.2 REFERENCES A. NECA National Electrical Contractor's Association. B NEC National Electrical Code (NEC). C. ASTM A36 Specification for structural steel. D ASTM American Society for Testing and Materials. E (UBC) UNIFORM BUILDING CODE 1.3 SYSTEM DESCRIPTION A. Design Requirements. 1 Hangers and supports shall have minimum safety factor of five (5), based on ultimate tensile or compressive strength, as applicable, of material used. 2. Anchors shall be applied in accordance with the ANCHOR CAPACITY TABLE following paragraph 3.2. PART 2 PRODUCTS 2.1 PRODUCT REQUIREMENTS A. Materials and Finishes: When not specified, provide corrosion resistance that provides as a minimum the same protection as the products being supported. B Provide materials, sizes and types of anchors, fasteners and supports to carry the loads of equipment and conduit. Consider weight of wire equal to full capacity of raceway in calculations for supports. C. Anchors and Fasteners: 1 Sheet Metal Screws: steel. 2. Machine Screws, Bolts, Nuts and "Washers: steel. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3 Precast Inserts: Suitable for the purpose, hot dipped galvanized finish. 4 Anchor bolts, expansion type: a. Phillips Red -Head. b. Hilti Kwik -Bolt. c. Rawl Rawl -bolt. 5 Cast -in -Place Anchors: Suitable for the purpose, hot dipped galvanized finish. 6 Beam Clamps: Malleable iron. D Raceway Supports: 1 Conduit Straps: One hole malleable iron, hot dipped galvanized. 2. Clamp Backs: Malleable iron hot dipped galvanized. 3 Conduit Hangers for conduit 1 or larger Carbon steel, hot dipped galvanized; clevis, adjustable ring or "J" type hangers. 4 Clip Hangers for conduit 3/4' or smaller Stamped steel -type for wire hanger attachment. E. Lighting Fixture Supports: 1 Pendent fixture hanger F Channels: a. Swivel fixture hanger malleable iron, hot dipped galvanized. Type as required for fixture weight. 1 Manufacturers: a. Unistrut. b Powerstrut. c. B -Line. d. Superstrut. 2. Material. 3 Fittings: By channel manufacturer 1 Material. 1/4 minimum. electro- galvanized. G. Hanger Rods: 1 Material. ''V4' minimum; electro- galvanized SECTION 16190 PAGE 2 SUPPORTING DEVICES a. 12 gauge steel, 1 5/8' by 1 -5/8' when not attached to building surface. b 14 gauge steel, 1 5/8" wide by 13/16" deep when connected directly to building surface. c. Hot -dip galvanized. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION 3.1 INSTALLATION A. General. 1 Install products in accordance with manufacturer's instructions. 2. Do not fasten supports to pipes, ducts, mechanical equipment and conduit. 3 Do not drill or cut structural members without approval of Owner's Representative. B Anchors: 1 Concrete Precast inserts, cast -in -place anchors or expansion type anchor bolts. a. When installing drilled -in anchors in non prestressed reinforced concrete, avoid the reinforcing bars. b. When installing drilled -in anchors into prestressed concrete (pre- or post- tensioned), locate tendons by using a non destructive method prior to installation. Maintain a minimum clearance of one -inch between the reinforcement and the drilled -in anchor 2 Sheet Metal Sheet metal screws or machine bolts, nuts and washers. 3 Structural Steel Members Beam clamps, machine screws, bolts, nuts and washers. 4 Wood Structural Members Lag bolts, wood screws, nuts and washers. SECTION 16190 PAGE 3 SUPPORTING DEVICES C. Supports described below are minimum requirements. All installations shall also meet the seismic requirements of UBC. D Conduit Supports: 1 Wall Mounting: a. Support individual conduits with approved conduit straps. b. Support groups of three or more conduits routed together by conduit racks constructed from steel channel. c. Space conduit supported directly from concrete or metal structure out at least 1/4 inch using straps with spacers or if three (3) or more conduits are located in a parallel run, they shall be spaced out from the wall approximately 5/8 inch to 1 inch by means of channel. 2. Ceiling Mounting: a. Runs of individual conduit or 1 or larger suspended from ceiling shall be supported with approved steel rods, hangers, and/or conduit straps. Vertical adjustment on threaded support rods shall be with 2 nuts on each end for positioning and locking. b Support raceway 3/4 or smaller by dedicated #9 gauge galvanized, soft annealed mild steel hanger wire and slamped steel conduit clip. c. Where three (3) or more conduits are suspended from the floor /ceiling, suitable steel racks shall be constructed. d. Space supporting points no greater than 10 -0' on center and within 12' of each change in direction. MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS E. Supports for Raceway Other Than Conduit 1 Secure to structure in accordance with manufacturer's instructions. F Equipment Supports: G Lighting Fixture Supports: 1 Install surface- mounted cabinets and panelboards with a minimum of four anchors. 2. In wet and damp locations use steel channel supports to stand cabinets and panelboards 13/16 inch minimum off wall. 3 Use sheet metal channels to bridge studs above and below cabinets and panelboards recessed in, or mounted on hollow partitions. 4 Support equipment in accordance with manufacturer's instructions. 1 Wall mounted. SECTION 16190 PAGE 4 SUPPORTING DEVICES a. Anchor outlet boxes supporting wall mounted fixtures, or fixture itself, to structure to resist a minimum load of the fixture weight plus 200 pounds. 2. Ceiling Mounted. a. Pendant mounted fixtures: 1 Provide pendant fixtures with swivel hangers which will allow fixture to swing in any direction but will not permit stem to rotate. Hanger shall be rated to support the weight of the fixture plus 200 pounds. 2. Swivel hangers for fixtures in mechanical equipment areas: Shock absorbing type. 3 Pendant mounted fluorescent fixtures which are individually mounted shall be suspended by a minimum of one swivel fixture hanger and one rod hanger for fixtures one foot wide or narrower and by one swivel fixture hanger and three rod hangers for fixtures wider than one foot. Rod shall be attached to ceiling with a hanger hook which allows movement of the rod. 4 Pendant mounted fluorescent fixtures which are mounted in continuous rows shall be mounted to metal channel. Channel shall be supported by one swivel fixture hanger and minimum of one rod hanger per each additional fixture plus one rod hanger or swivel fixture hanger at the end. Continuous row assembly shall be braced to limit swing and to support the weight of the assembly plus an additional 200 pounds at any point on the row Provide reflector alignment clips on all industrial fluorescent fixtures mounted in continuous rows. 5 Where fixtures are pendant mounted in mechanical spaces, mount fixtures to channel supports as necessary to span the undersides of mechanical ducts and piping. b. Recessed mounted fixtures: 1 Recessed and semi- recessed fixtures shall not be supported from suspended ceiling support system. Provide a minimum of four support rods or wires per fixture and locate at each corner of the ceiling grid in which the fixture is located. 1 1 1 1 1 1 1 1 1 1 t 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS H. Sleeves: 3.2 FIELD QUALITY CONTROL c. Surface ceiling mounted fixtures: SECTION 16190 PAGE 5 SUPPORTING DEVICES 2. Where fixtures are of a size less than the ceiling grid provide at least two channel supports spanning and secured to the ceiling grid. Attach fixture to channel and support channel from the structural ceiling with a minimum of four wires or rods. 3 Provide support clips to securely fasten each fixture to the ceiling grid system. 1 Anchor fixtures to structural ceiling as required to resist a minimum load of the weight of the fixture plus 200 pounds. 2. Coordinate fixture support installation with ceiling construction type and installation sequence. 1 Set sleeves in position in formwork. Provide reinforcing around sleeves. 2. Extend sleeves through floors one inch above finished floor level. Calk sleeves full depth and provide floor plate. 3 Where raceway penetrates floor, ceiling, or wall, close off space between pipe or duct and adjacent work with fire stopping insulation and calk seal. A. All expansion anchors shall have 50 percent of the bolts (alternate bolts in any group arrangement) proof tested in tension and certified by a recognized testing agency at the values indicated in the following table, except where shown otherwise on the drawings. If there are any failures, the immediately adjacent bolts must then also be tested. Anchor capacities shall not exceed 80% of the values in the published ICBO report. ANCHOR CAPACITY (3000 PSI MINIMUM STONE AGGREGATE CONCRETE) 1/2" 5/8" 3/4" 7/8" 1" 1 -1/4" UNITS IN TENSION 680 960 1,360 1,900 2,700 3,600 LBS IN SHEAR 1,170 1,680 2,420 3,500 ,020 6,700 LBS TYPE OF TEST. DIRECT PULL TENSION,LBS. 1,360 1,920 2,720 3,800 5 400 7,200 LBS MINIMUM EMBEDMENT 3 3 -3/4 4 -1/2 5 -1/4 6 71/2 INCHES END OF SECTION 16190 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 3 EXECUTION SECTION 16450 PAGE 1 GROUNDING PART 1 GENERAL 1.1 DESCRIPTION Grounding systems shall be provided for equipment grounds and bonding as required by code. PART 2 PRODUCTS 2.1 GROUNDING CONDUCTORS AND CONNECTORS Copper only sized per code. Bare or green insulated in sizes #10 AWG or larger Green insulated for size #12 AWG. 3.1 GROUNDING, GENERAL A. Provide all grounding for electrical systems and equipment as required by codes and as specified herein. B. Branch Circuit Grounding: All branch circuits in patient areas shall include an insulated green ground wire connected between the branch circuit panelboard ground bus and the wiring device (or equipment) ground terminal that the branch circuit serves. One ground wire in each branch circuit raceway looped between ground terminals, is required. For the purposes of this code requirement, the entire project area up to a height of eight feet above the floor shall be considered to be a patient occupied area. Green tape identification (in lieu of green insulation) on ground wires is not acceptable. 3.2 SIZE OF GROUND WIRE As required by National Electric Code. Where ground wire is exposed to physical damage protect with rigid non ferrous conduit as permitted by applicable code. 3.3 GROUND CONNECTION OF PIPING Metal internal piping shall be grounded, as a part of this contract. 3.4 CONNECTION TO THE POWER GROUND BUS A. Furnish and install connections in accordance with the codes; including but not limited to: 1 Raceway system 2. Switchboard 3 Electrically operated equipment and devices. B No device or equipment shall be connected for electrical service which has a neutral conductor connected to a grounding conductor or to the frame within the device or equipment. 3.5 METHOD OF CONNECTIONS Make all ground connections and ground cable splices by thermal welding or copper compression set type connectors U.L. listed for grounding purposes. Grounding lugs, where provided as standard manufacturer's items on equipment furnished, may be used. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.6 EXPANSION FITTINGS 3.7 TESTING Conform to Section 16030 3.8 GROUND CABLE CROSSING EXPANSION JOINTS 3.9 GROUNDING FOR PANELBOARD FEEDERS 3.10 GROUND BUS AT PANELBOARDS SECTION 16450 PAGE 2 GROUNDING In conduit runs requiring an expansion fitting, a bonding jumper shall be installed around the fitting to maintain continuous ground continuity Ground cables crossing expansion joints or similar separations m structures or paved areas shall be protected from damage by means of suitable approved devices or methods of installation which will provide the necessary slack in the cable across the joint to permit movement. Stranded or other approved flexible copper run or jumper shall be used across such separations. Provide a grounding bushing with #10 ground conductor (or larger when required by code) to the grounding bus in the panelboard and switchboards. Provide #10 ground conductor between ground busses of any two panelboards with circuits serving the same patient area. END OF SECTION 16450 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS MCHINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Provide modifications to existing switchboards as indicated on plans. PART 2 PRODUCTS 2.1 MANUFACTURER Existing switchboards are manufactured by Square D 2.2 COORDINATION STUDY SECTION 16470 PAGE 1 SWITCHBOARDS Manufacturer to prepare coordination study Study to indicate switchboard components are selectively coordinated for all levels of short circuit current. Submit settings and trip curves of all components. 2.3 SWITCHBOARD COMPONENTS Include (but not limited to) the following: A. Switches and fuses or breakers, amperage as shown, selectively coordinated for all levels of short circuit current. Set adjustable over current devices at factory Fuse clips to be rejection type for Class R fuses. Fuses per 16180 B. Overcurrent devices utilized shall include devices labeled "current limiting" which shall limit the available rms fault current at branch circuit panelboards to under 10 000 amps symmetrical for 120/208 volt and 14 000 amps symmetrical for 277/480 volt breakers. C. Cleats for securing conductors. Miscellaneous appurtenances as required for complete installation. 2.4 NAMEPLATES A. Provide permanently attached engraved nameplates per Section 16100 for each protective device and disconnect device. For each protective device and disconnect include load (1/4 letters) and area served (1/8" letters) and fuse size and type when fused (1/8" letters). B. Nameplate color shall be: Normal System white on black; Emergency System white on red. PART 3- EXECUTION 3.1 WIRING Conform with applicable specification sections. Conductors and terminations shall conform with 16120 Secure all conductors to switchboard structure. 3.2 GROUNDING Provide per 16450 END OF SECTION 16470 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Dead front type, conforming with U.L. 67 and NEMA PB 1 1 PART 2 PRODUCTS 2.1 MANUFACTURER Square D GE, Cutler Hammer, Siemens, Westinghouse, IEM. 2.2 SHOP DRAWINGS A. Submit for review prior to manufacture. Include complete description, front view dimensions, device sizes and layout, and ground bus(s). B. Dimensions: Not exceeding dimensions noted or shown. 2.3 PANELBOARD TYPE A. Rated at proper voltage and current, bus bars of copper or aluminum, 3 phase, 4 wire, 100 percent neutral, unless noted otherwise. Multiple lugs where conductors in parallel or "feed through" or double lugs are shown. B. Bolted busbar to busbar connections. Conductor connectors to conform with 16120 bolted to busbars using Grade 5 bolts, belleville and flat washers. C. Separate ground bus bonded to panelboard cabinet. D Isolated ground bus insulated from cabinet when noted. E. Service entrance label for service entrance equipment. 2.4 CIRCUIT BREAKERS AND FUSED SWITCHES A. U.L. interrupting rating labeled. Ratings as noted. Minimum rating: 208Y/120V Panelboards 480Y/277V Panelboards Fusible Panelboards B Circuit breakers: Conform with UL 489 labeled for 75 °C conductors. threaded, bolt on type. Common trip on multiple pole breakers. switching loads. C. Spares and spaces: Complete for future circuits. Where "Space" is device mounting hardware and steel knockouts in dead front. 2.5 CABINET AND FRONTS 10,000 AIC symmetrical 14,000 AIC symmetrical 100 000 AIC symmetrical SECTION 16471 PAGE 1 PANELBOARDS Mount per panel schedules. Pre Labeled SWD' when utilized for indicated, provide space, bussing, A. Flush or surface, as noted. Tight closing doors without play when latched. Where two cabinets are located adjacent to each other in finished areas, provide matching trim, same height. Where remote controlled switch or contactor is mounted in panelboard, mount on same frame as panelboard interior, with dedicated key lock access door over MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS B Fronts: Lifting rest. Door -in -door hinged at right side in addition to hinged door with flush key lock over dead front. Key identically Match existing key system where applicable. SECTION 16471 PAGE 2 PANELBOARDS C. Finish. Factory prime coat for cabinets located in finished areas. When located in unfinished areas, factory standard lacquer or enamel finish, gray or blue -gray color over prime coat. 2.6 NAMEPLATES A. Engraved nameplates per Section 16100 permanently attached to panelboard front. Include panel name with 3/16" letters, area served, voltage, phase and wire (e.g. 2N1, 208Y/120 3 phase, 4 wire or 4P 480Y/277 3 phase, 4 wire) in 1/8 inch characters. Include switchboard fed from (e.g. Fed from SWBD 4A). B. Nameplate color Normal system white letters on black. Emergency system white letters on red. 2.7 SYSTEM OF NUMBERING AND BUS ARRANGEMENT As noted on Panel Schedules. PART 3 EXECUTION 3.1 MOUNTING Install cabinets, level, 6'-6" above finished floor unless otherwise required. Support in accordance with Section 16190 3.2 WIRING Conform to applicable sections of these specifications and NEMA PB 1 1 Conductors and terminations per 16120 Coverplates in open knockouts. 3.3 CIRCUIT INDEX AND LABELS Typed circuit index with odd circuits on left, even circuits on right, listing each circuit by number with complete load designation, (i.e. Receptacle room lights room etc.). Room names/numbers per actual room identification assigned by Architect at project completion (assigned room numbers may differ from drawings) Mount inside door with transparent protective cover Provide number labels on circuit breakers matching index. 3.4 WORK CLEARANCE Verify space available with equipment sizes and code required working clearances prior to submitting shop drawings. 3.5 GROUNDING Provide per 16450 3.6 CABINET PAINTING Cabinets furnished prime painted. Field paint matching wall color (See Division Painting). MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.7 FEED THROUGH AND DOUBLE LUGS Provide feeder with amperage equal to incoming feeder to panels and sections fed via feed through or double lugs. 3.8 DEDICATED SPACE SECTION 16471 PAGE 3 PANELBOARDS Locate in dedicated spaces. Coordinate project construction so piping, ducts, etc. are routed around dedicated spaces above and in front of panelboards per code. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PANELBOARDS APPENDIX 1 NEW PANELBOARDS SECTION 16471 PAGE 4 PANELBOARDS N ON a I r— Oa r MI OM la Oa MB MI PANELSCHEDULE NAME. 1 N 1 i LOCATION: 1st FLOOR CORRIDOR C104 TYPE DESCRIPTION REC PANEL NORI REC PANEL NOR2 REC PANEL NOR3 REC PANEL NOR4 REC PANEL NOR5 REC PANEL NOR6 REC PANEL NOR 7 SPACE SPACE SPACE LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR LTS 125% REC 1st.100 100% REC 25.9 50% HVAC 100% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 1 st. 10.0 13.0 ROOM# LOAD TRIP KVA RATING 2.5 30/ 2 1 2 3 2.9 30/ 2 5 2 7 2.7 30/ 2 9 11 2.2 30/ 2 13 2 15 2:2 30/ 2 17 2 19 2.7 30/ 2 21 2 23 2.7 30/ 2 25 2 27 29 31 33 35 37 39 41 0 0 0 NOTES: 16471 APPENDIX 100A TRIP RATING 2 3012 4 2 6 30/ 2 8 2 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 VOLTAGE. LOAD KVA TYPE 208Y/ 120V SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE DESCRIPTION CONN. NEC NEC LOAD NEC PHASE (INA) FACTOR (KVA) AMPS A: 6.2 64% 4.0 33 5.1 64% 3.2 27 C: 3.9 64% 2.5 21 NEC TOTA L. I 15.21 1 9.71 27 3 ph. 4 wire LUGS ONLY 10 KAIC KIT 100% CIRCUIT BREAKER CODE 5. LTS 100% G GFCI H HID RATED EQUIP 100% S SHUNT TRIP D SWITCHING DUTY MISC 100% 1 FED FROM: 1 DOWNSTREAM LOAD INFORMATION TOTAL 35.9 64% 23.0 FEEDER LENGTH: 1 1 REV FEED THRU LUGS 1 I FEEDER: 1 DATE. DOUBLE LUGS 1 SPARLING, INC 7/21/97 PANEL SCHEDULE NAME. 1N2 LOCATION: 1st FLOOR CORRIDOR C104 1 YPE DESCRIPTION REC LOUNGE REFRIG #12 REC LOUNGE MICROWAVE #13 REC LOUNGE INSTA HOT REC LTS LOUNGE REC LOCKER ROOMS REC LTS EDUCATION REC STORAGE, DARKROOM EQUIP GARBAGE DISPOSAL PATHOLOGY REC RECOVERY REC LTS RECOVERY REC RECOVERY REC PATHOLOGY REC MAIN CORRIDOR REC LTS OFFICE, SOILD UTIL SPARE REC RECOVERY BEDS WEST REC RECOVERY BEDS WEST REC RECOVERY BEDS SOUTHWEST REC RECOVERY BEDS SOUTHWEST REC RECOVERY.BEDS SOUTHWEST REC RECOVERY BEDS SOUTHWEST LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR LTS 0.2 125% REC 1st. 10.0 100% REC 19.1 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 8.2 100% MISC 100% TOTAL 37.5 75% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 0.3 1st. 10.0 9.5 8.2 ROOM# LOAD KVA 1.2 1.0 1.5 0.8 1.4 1.0 0.8 1.0 0.5 0.6 0.5 0.9 0.7 0.6 0.5 0.5 0.5 0.5 0.5 0.5 FED FROM: 28.0 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 2011 2011 201 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 2011 20/ 1 201 1 20/ 1 201 1 20/ 1 20/ 1 20/ 201 1 20/1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 O 0 0 1 r I O 0 0 OM U1 UM MN 11 OR MO NM IMP NOTES: 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 225A BUS TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 40/ 2 2 2011 2011 20/ 1 20/ 1 20/1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 VOLTAGE. REV DATE. LOAD KVA TYPE 0.5IREC 0.5IREC 0.5IREC 0.5IREC 0.5IREC 0.2ILTS 0.7 REC 0.8 REC 0.8 REC 4.0 REC 0.9 REC 0.4 REC 1.1 EQUIP 1.6 EQUIP 208Y/ 120V 3 ph. PHASE A: B: C: NEC TOTAL. G GFCI S SHUNT TRIP FEED THRU LUGS IID0UBLE LUGS LUG ONLY DESCRIPTION RECOVERY BEDS SOUTHEAST RECOVERY BEDS SOUTHEAST RECOVERY BEDS NORTH RECOVERY BEDS NORTH RECOVERY ISOLATION DARKROOM PRE -OP, SUB STERILE LTS NURSE STATION ITS NURSE STATION OR #6 LITHOTRIPSY SPARE SPARE SOILED UTILITY, SUB STERILE PRE -OP SUB- STERIEL, STERILIZER SUB STERIELBLANKET WARMER SPARE SPARE SPARE SPARE CON ON-N. (KVA) 14.0 13.8 9.7 37.51 NEC FACTOR 75% 75% 75% CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION 1 X 11N3 1 SPARLING, INC 4wire 10 KAIC NEC LOAD NEC (KVA) AMPS 10.5 87 10.3 86 7.2 60 I 28.01 78 (8.4kva) 7/21/97 r r• 1111111 11111111 r =I. l 111111 MN r. Ian 11111 11110 1M11 INS IN MI NMI NIB MI 11111 1111 MN 1111 11111 PANEL SCHEDULE NAME. 1N3 LOCATION: 1st FLOOR CORRIDOR C104 ROOMit LOAD TYPE DESCRIPTION KVA REC EQUIP STORAGE 1.0 REC DICTATION 11 REC SURGERY CORRIDOR 1 1 EQUIP SUB STERILE, STERILIZER 1 1 REC SUB STERILE, CLEAN UP 0.7 EQUIP STERILE, BLANKET WARMER 1:6 EQUIP STERILE, STERILIZER 1.8 SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 3.9 100% 1st. 3.9 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 4 5 100% 4.5 MISC 100% TOTAL 8.4 100% OLYMPIC MEMORIAL HOSPITAL 0 0 0 VOLTAGE. 208Y/ 120V 3 ph. 1 1 I 0 0 0 225A BUS TRIP TRIP RATING RATING 20/ 1 1 2 20/ 1 20/ 1 3 4 20/ 1 20/ 1 5 6 20/ 1 20/ 1 7 8 20/ 1 20/ 1 9 10 20/ 1 20/ 1 11 12 20/ 1 20/ 1 13 14 20/ 1 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 11111 30 31 32 33 34 35 36 37 1011 38 39 40 41 42 NOTES:. 16471 APPENDIX LOAD KVA TYPE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE G GFCI S SHUNT TRIP LUG ONLY DESCRIPTION FED FROM: 1 DOWNSTREAM LOAD INFORMATION 8.4 FEEDER LENGTH: 1 1 REV' FEED THRU LUGS FEEDER: 1 1 DATE. DOUBLE LUGS 1 SPARLING, INC 4 wire 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 3.9 100% 3.9 32 8: 1.8 100% 1.8 15 C: 2.7 100% 2.7 22 NEC TOTAL.' 8.41 1 8.41 23 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY 7/21/97 PANEL SCHEDULE NAME. 1Y4 LOCATION: 1st FLOOR CORRIDOR C104 TYPE DESCRIPTION EQUIP RECOVERY, BLANKET WARMER REC RECOVERY REC RECOVERY EQUIP PATHOLOGY, CRYOCUT EQUIP PATHOLOGY, REFRIGERATOR SPARE SPARE SPARE SPARE REC RECOVERY BEDS NORTH REC RECOVERY BEDS NORTH REC RECOVERY BADS NORTH REC RECOVERY BEDS NORTH REC RECOVERY BEDS NORTH REC RECOVERY ISOLATION REC RECOVERY ISOLATION REC RECOVERY ISOLATION EQUIP RECOVERY REFRIG EQUIP RECOVERY ICE MACHINE REC TEMP ANESTH* REC TEMP ANESTH REFRIG* LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR ,LTS 125% REC 1st. 10.0 100% REC 4.0 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 5.5 100% MISC 100% TOTAL 19.5 90% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 5.5 ROOM# LOAD KVA 1.7 0.5 0.4 1.1 1.1 0.5 0.4 0.2 0.5 0.4 0.5 0.4 0.2 1.6 1.1 1.0 FED FROM: 17.5 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/1 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 I I I 0 0 0 NOTES: 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 1st. 10.0 'CIRCUITS ARE SPARE AT COMPLETION 2.0 OF PROJECT 100A TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 201 1 2011 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 VOLTAGE. REV DATE. LOAD KVA TYPE 0.5IREC 0.4IREC 0.2IREC 0.5IREC 0.4IREC 0.5IREC 0.4IREC 0.2IREC 0.5IREC 0.4IREC 0.5IREC 0.4IREC 0.2IREC 0.5IREC 0.4IREC 0.5IREC 0.4IREC 0.2IREC 0.5IREC 0.4IREC 208Y/ 120V FEED THRU LUGS IIDOUBLE LUGS 3 ph. LUG ONLY DESCRIPTION RECOVERY BEDS WEST RECOVERY BEDS WEST RECOVERY BED6 WEST RECOVERY BEDS WEST RECOVERY BEDS WEST RECOVERY BEDS SOUTHWEST RECOVERY BEDS SOUTHWEST RECOVERY BEDS SOUTHWEST RECOVERY BEDS SOUTHWEST RECOVERY BEDS SOUTHWEST RECOVERY BEDS SOUTH RECOVERY BEDS SOUTH RECOVERY BEDS SOUTH RECOVERY BEDS SOUTH RECOVERY BEDS SOUTH RECOVERY BEDS SOUTH RECOVERY BEDS SOUTHEAST RECOVERY BEDS SOUTHEAST RECOVERY BEDS SOUTHEAST RECOVERY BEDS SOUTHEAST SPARE PHASE A. B: C: NEC TOTAL. CONN. (KVA) 7.3 6.3 5.8 19.51 NEC FACTOR 90% 90% 90% SPARLING, INC NEC LOAD (KVA) 6.6 5.7 5.2 I 17.51 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION 4 wire 10 KAIC NEC AMPS 55 47 44 49 7/21/97 I ON MI NM MN II UM US MI NM N GM IS 411111 Ma MN PANEL SCHEDULE NAME. 1 Y5 LOCATION: 1st FLOOR CORRIDOR CI10 fYPE LTS LTS LTS LTS LTS LTS LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION 1st FLOOR EAST (CB2 -14) BASEMENT (CB2 -27) BASEMENT (CB2 -49) BASEMENT (CB2 -50) TEL ROOM (CB2 -52) 2E SOUTH SIDE (CB2 -75) SPARE SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPACE CONN. NEC CALCULATED (KVA) FACTOR 6.1 125% 1st. 2.5 100% 50% 100% 100% 100% 0.2 100% 100% 8.8 117% NEC CALC. LOAD (KVA) 7.6 1st. 2.5 0.2 ROOM# LOAD KVA 1.31 1.21 1.21 0.81 0.2 1.4 FED FROM: 10.3 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 1 2 20/1 3 4 20/ 1 5 6 20/ 1 7 8 20/ 1 9 10 20/ 1 11 12 20/ 1 13 14 20/ 1 15 16 20! 1 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 gill 32 33 NIP 34 35 36 37 111111 38 39 40 41 42 0 0 0 1 1 I 0 0 0 NOTES VOLTAGE. 100A TRIP LOAD RATING KVA TYPE 20/ 1 20/ 1 20/ 1 REV: DATE 208Y/ 120V 3 ph. FEED THRU LUGS DOUBLE LUGS LUG ONLY DESCRIPTION 20/ 1 1 0.4 REC TEL ROOM (B2 -53) 20/ 1 0.7 REC 20/ 1 0.7 REC 2011 0.2 EQUIP 20/ 1 0.2 REC 20/ 1 0.5 REC BASEMENT CB2 -55) BASEMENT CB2 -56) LAB REFRIG (CB2 -58) LAB REFRIG (CB2 -59) ADMIN COMPUTER (CB2 -62) SPARE SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPACE CONN. NEC NEC LOAD PHASE (KVA) FACTOR (KVA) A: 2.7 117% 8: 2.3 117% C: 3.8 117% NEC TOTAL.' 8.81 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION SPARLING, INC j 3.2 2.7 4.5 10.31 4 wire 10 KAIC NEC AMPS 26 22 37 29 OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE NAME. 1 Y6 LOCATION: 1st FLOOR CORRIDOR C104 TYPE DESCRIPTION REC PRE -OP REC ANESTH WORKROOM REC ANESTH STORAGE #4 EQUIP STERILE STERILIZER EQUIP STERILE, STERILIZER SPARE EQUIP MOTORIZED DAMPERS ISOLATION EQUIP PNEUMATIC TUBE STATION- RECOVERY EQUIP PNEUMATIC TUBE STATION- SURGERY EQUIP NURSE CALL SYSTEM EQUIP PNEUMATIC TUBE STATION- STERILE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.8 125% 1.0 REC 1st. 2.6 100% 1st. 2.6 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 4.8 100% 4.8 MISC 100% TOTAL 8.2 102% OLYMPIC MEMORIAL HOSPITAL LOAD KVA ROOIvW 0.8 0.7 1.1 1.1 1.1 0.1 0.5 0.5 0.5 0.5 FED FROM: 8.4 FEEDER LENGTH: FEEDER: 0 0 0 VOLTAGE. 208Y/ 120V 3 ph. 4 wire 1 1 1 1 0 0 0 100A TRIP TRIP RATING RATING 20/ 1 1 2 20/ 1 201 1 3 4 20/ 1 20/1 5 6 20/1 20/ 1 7 .11 8 20/ 1 20/ 1 9 10 20/ 1 20/ 1 11 12 20/ 1 20/ 1 13 14 20/ 1 201 1 15 16 20/ 1 20/ 1 17 18 20/ 1 20/ 1 19 20 20/ 1 20/ 1 21 22 20/ 1 23 24 25 26 27 28 29 30 31 Oil 32 35 36 37 1.11 38 39 40 41 42 NOTES: LOAD' KVA TYPE 0.8 LTS 0.5 EQUIP DESCRIPTION REC AC -1 2 MASTER CLOCK SYSTEM SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE I DOWNSTREAM LOAD INFORMATION 1 REV' FEED THRU LUGS 1 1 DATE. DOUBLE LUGS 1 SPARLING, INC LUG ONLY 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 3.3 102% 3.3 28 B: 3.3 102% 3.4 28 C: 1.6 102% 1.6 14 NEC TOTAL.' 8.21 1 8.41 23 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY 16471 APPENDIX 7/41/97 MS Mr 1111O INN r MI 11111 MI NM MS N MI GM r NB 111111 r- r r- MI r OM MI r OM MI i•• PANEL SCHEDULE NAME. 1 YD LOCATION: 1s1 FLOOR CORRIDOR C104 TYPE DESCRIPTION REC PANEL YOR1 REC PANELYOR2 REC PANEL YOR3 REC PANEL YOR4 REC PANELYOR5 REC PANEL YOR6 REC PANEL YOR7 SPARE SPACE SPACE SPACE SPACE SPACE LOAD CONN. TYPE (KVA) LTS 35.8 REC 1st.10.0 REC 57.0 HVAC KIT S. LTS EQUIP MISC TOTAL NEC CALCULATED NEC CALC. FACTOR LOAD (KVA) 125% 44.7 100% 1st. 10.0 50% 28.5 100% 1 ROOM# LOAD TRIP KVA RATING 3.8 30/ 2 1 2 3 3.5 30/ 2 5 2 7 4.1 30/ 2 9 2 11 3.8 30/ 2 13 2 15 3.8 30/ 2 17 2 19 4.0 30/ 2 21 2 23 3.9 30/ 2 25 2 27 30/ 2 29 2 31 33 35 37 39 41 0 0 0 NOTES: 250A BUS TRIP RATING 2 100/ 3 4 3 6 3 8 100/ 3 10 3 12 3 14 100/ 3 16 3 18 3 20 100/ 3 22 3 24 3 26 28 30 32 34 36 38 40 42 VOLTAGE. 208Y/ 120V 3 ph. LOAD KVA TYPE DESCRIPTION SPARE 7.3IPNL 1Y4 6.31 5.81 3.3IPNL 1Y6 3.31 1.6 13.2 PNL 3Y2 13.5 8.9 SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE LUGS ONLY CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 49.3 85% 41.7 347 B: 48.1 85% 40.6 338 C: 30.6 85% 25.1 209 NEC TOTAL.' 12711 107.51 298 100% CIRCUIT BREAKER CODE 100% G GFCI H HID RATED 13.4 100% 13.4 S SHUNT TRIP D SWITCHING DUTY 10.5 100% 10.5 FED FROM: 1 1 DOWNSTREAM LOAD INFORMATION 126.7 85% 1071 FEEDER LENGTH: 1 1 REV' FEED THRU LUGS 1 FEEDER: 1 1 DATE. DOUBLE LUGS 1 SPARLING, INC 4 wire 10 KAIC OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE NAME. 1 Z 1 OCATION: ELEC/MECH ROOM B52 ROOMIF LOAD KVA EQUIP CIRC PUMPS HEATING CP 1 6.3 TYPE DESCRIPTION EQUIP CIRC PUMPS HEATING CP -2 HAVC AC -2 SUPPLY AND RETURN FAN HVAC EF -2 SURGERY EXHAUST SPARE SPACE SPACE SPACE SPACE SPACE SPACE LOAD CONN. TYPE (KVA) LTS REC REC HVAC 38.5 KIT S. LTS EQUIP 37.7 MISC TOTAL 76.2 OLYMPIC MEMORIAL HOSPITAL 6.3 23.7 2.8 NEC CALCULATED NEC CALC. FACTOR LOAD (KVA) 125% 100% 50% 100% 38.5 100% 100% 100% 37.7 100% FED FROM: 100% 76.2 FEEDER LENGTH: FEEDER: TRIP RATING 15/3 3 3 15/ 3 3 3 40/ 3 3 3 15/ 3 3 3 20/ 3 3 3 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 DENOTES CHANGE IN CIRCUIT 0 0 0 MO 11 OE OM 11 OE MO OE MO U1 OE NOTES: 150A TRIP RATING 2 15/ 3 4 3 6 3 8 20/ 3 10 3 12 3 14 40/3 16 3 18 3 20 20/ 3 22 3 24 3 26 20/ 3 28 3 30 3 32 34 36 38 40 42 VOLTAGE. LOAD KVA TYPE DESCRIPTION 4.0 EQUIP MED AIR COMPRESSORS 9.1 23.7 12.0 12.0 480Y/ 277V 3 ph. LUGS ONLY EQUIP MED VACUUM HVAC AC -1 SUPPLY AND RETURN FAN HVAC AC-4 SUPPLY AND RETURN FAN EQUIP HUMIDIFIER SPACE SPACE SPACE SPACE SPACE SPACE SPARLING, INC 4 wire 1 14 KAIC 1 CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 33.3 100% 33.3 120 B: 33.3 100% 33.3 120 C: 33.3 100% 33.3 120 NEC TOTAL.' 99.91 99.91 120 CIRCUIT BREAKER CODE G GFCI H HID RATED 9 SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV' FEED THRU LUGS 1 DATE. DOUBLE LUGS 1 16471 APPENDIX 7/21/97 r rlrr ON MN ON MI N r rr r MIN Ma MI OM In r I MI MR MI i OM 1PANEL SCHEDULE NAME. 2N2 2 OCATION: 2 MAIN ELEC ROOM TYPE DESCRIPTION REC PATIENT ROOM NORTH REC PATIENT ROOM NORTH REC PATIENT ROOM NORTH REC PATIENT ROOM NORTH REC PATIENT ROOM NORTH IREC PATIENT ROOM NORTH IREC PATIENT ROOM NORTH 2 BED REC PATIENT ROOM NORTH 2 BED REC PATIENT ROOM NORTH 2 BED REC PATIENT ROOM NORTH ISOLATION EC PATIENT ROOM NORTH ISOLATION REC PATIENT ROOM NORTH ISOLATION IREC PATIENT ROOM NORTH ISOLATION IREC PATIENT ROOM NORTH ISOLATION IREC PATIENT ROOM NORTH ISOLATION 'REC PATIENT ROOM NORTH 2 BED REC PATIENT ROOM NORTH 2 BED REC PATIENT ROOM NORTH 2 BED SPARE SPARE SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.8 125% 1.0 REC 1st. 10.0 100% 1st. 10.0 REC 30.1 50% 15.1 HVAC 0.2 100% 0.2 KIT 100% S. LTS 100% EQUIP 10.4 100% 10.4 MISC 100% TOTAL 51.5 71% OLYMPIC MEMORIAL HOSPITAL 0 0 0 VOLTAGE. 208Y1 120V 3 ph. 4 wire I I I ROOM# 0 0 0 225A BUS LUG ONLY 10 KAIC LOAD TRIP TRIP LOAD KVA RATING RATING KVA TYPE DESCRIPTION 1.1 20/ 1 1 2 20/ 1 1 1 REC PATIENT ROOMSOUTH 1 1 20/ 1 3 4 20/ 1 1 1IREC PATIENT. ROOM SOUTH 1.1 20/ 1 5 6 20/ 1 1.1IREC PATIENT ROOM SOUTH 1.1 20/ 1 7 8 20/1 1.1IREC PATIENT ROOM SOUTH 1.1 20/ 1 9 10 20/ 1 1.1IREC PATIENT ROOM SOUTH 1.1 20/ 1 11 12 20/ 1 1.1IREC PATIENT ROOM SOUTH 1.1 20/ 1 13 14 20/ 1 1.1IREC PATIENT ROOM SOUTH 1.1 20/ 1 15 16 20/ 1 1.1IREC PATIENT ROOM SOUTH 1.1 20/ 1 17 18 20/ 1 1 1 REC PATIENT ROOM SOUTH 1.1 20/ 1 19 20 20/ 1 1.1IREC PATIENT ROOM SOUTH 1.1 20/ 1 21 22 2011 1.2IREC LTS CLEAN LINEN, LOUNGE 1.1 20/ 1 23 24 20/ 1 1.OIEQUIP LOUNGE INSTA HOT 1.1 20/ 1 25 26 20/ 1 1.2IEQUIP LOUNGE MICROWAVE 1 1 20/ 1 27 28 20/ 1 1.0IEQUIP LOUNGE REFRIG. 1.1 20/ 1 29 30 20/ 1 1.6 EQUIP CLEAN LINEN BLANKET WARMER 1.1 20/ 1 31 IP. 32 20/ 1 1.1 EQUIP MEDS REFRIG. 1.1 20/ 1 33 34 20/ 1 SPARE 1.1 20/ 1 35 36 20/ 1 SPARE 20/ 1 37 38 20/ 1 SPARE 20/ 1 39 40 20/ 1 SPARE 20/ 1 41 42 20/ 1 SPARE NOTES: 16471 APPENDIX SPARLING, INC CONN. NEC NEC LOAD NEC PHASE (INA) FACTOR (KVA) AMPS A: 16.5 71% 11.8 98 B: 18.5 71% 13.2 110 C: 16.5 71% 11.7 98 NEC TOTAL. I 51.51 36.71 102 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY FED FROM 1 DOWNSTREAM LOAD INFORMATION 36.7 FEEDER LENGTH: 1 1 REV: FEED THRU LUGS 1 X 12N3 FEEDER: 1 1 DATE. I DOUBLE LUGS 1 (13.6kva) 7/21/97 PANEL SCHEDULE NAME. 2N3 LOCATION: 2 MAIN ELEC ROOM TYPE DESCRIPTION REC LTS NURSE STATION EAST REC NURSE STATION EAST REC LTS NURSE STATION EAST REC LTS NURSE STATION EAST REC STORAGE, SOILED UTILITY REC LTS STORAGE, NURSE STATION REC LTS NURSE STATION, CLEAN UTILITY REC LTS NURSE STATION REC NURSE STATION REC NURSE STATION, PLAY AREA REC 2 MAIN CORRIDOR LTS NORTH -SOUTH CORRIDOR WORKSRM SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.8 125% 1.0 REC 1st. 8.1 100% 1st. 8.1 REC 50% HVAC 0.2 100% KIT 100% S. LTS 100% EQUIP 4.5 100% MISC 100% TOTAL 13.6 101% OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD KVA 0.5 0.5 0.5 0.5 1.1 1.1 0.7 1.2 0.3 0.3 14 0.8 SPARLING, INC f 4 wire 0 0 0 VOLTAGE. 208Y/ 120V 3 ph. 1 I I 0 0 0 225A BUS LUG ONLY 10 KAIC TRIP TRIP LOAD RATING RATING KVA TYPE DESCRIPTION 20/ 1 1 2 20/ 1 1 0.6 EQUIP CLEAN UTILITY REFRIG. 20/ 1 3 4 20/ 1 1 0.6 EQUIP CLEAN UTILITY REFRIG. 20/ 1 5 6 20! 1 1 1.1 EQUIP CLEAN UTILITY ICE MACHINE 20/ 1 7 01■ 8 2011 1 0.6 EQUIP SOILED UT1TITY REFRIG. 20/ 1 9 10 20! 1 1.6 EQUIP CLEAN UTIL. BLANKET WARMER 20! 1 11 12 2011 0.2 HVAC EF -7 ROOF 20! 1 13 14 SPACE 20! 1 15 16 SPACE 20! 1 17 18 SPACE 20/ 1 19 20 SPACE 20/ 1 21 22 SPACE 20/ 1 23 24 SPACE 20/ 1 25 26 SPACE 20/ 1 27 28 SPACE 20/ 1 29 30 SPACE 20! 1 31 32 SPACE 20/ 1 33 34 SPACE 20/ 1 35 ■i 36 SPACE 20/ 1 37 38 SPACE 20/ 1 39 40 SPACE 20/ 1 41 42 SPACE NOTES: CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 3.2 101% 3.3 27 B: 6.4 101% 6.5 54 C: 4.0 101% 4.1 34 0.2 NEC TOTAL.' 13.61 1 13.81 38 CIRCUIT BREAKER CODE G GFCI H HID RATED 4.5 S SHUNT TRIP D SWITCHING DUTY FED FROM: 1 DOWNSTREAM LOAD INFORMATION 13.8 FEEDER LENGTH: 1 1 REV' FEED THRU LUGS 1 1 FEEDER: 1 1 DATE. DOUBLE LUGS 1 1 16471 APPENDIX 7/21/97 MI NM MI 1110 UM E ON MI MI WM MI r NM MI NM MI I IIIIIII 0 1 N OM MI OM MI OM all i MI 1 I PANEL SCHEDULE NAME. 2Y2 LOCATION: 2 MAIN ELEC ROOM TYPE DESCRIPTION REC PATIENT ROOM SOUTH REC PATIENT ROOM SOUTH REC PATIENT ROOM SOUTH REC PATIENT ROOM SOUTH REC PATIENT ROOM SOUTH EQUIP MOTORIZED DAMPERS ISOLATION SPARE SPARE SPARE SPARE LTS REC AC-4 LTS PATIENT ROOM SOUTH EQUIP PNEUMATIC TUBE REC NURSE STATION ISOLATION REC CHARTING REC CHARTING REC NURSE STATION EQUIP PNEUMATIC TUBE REC NURSE STATION SPARE SPARE LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR LTS 7.0 125% REC 1st. 10.0 100% REC 9.6 50% HVAC 100% KIT 100% 5. LTS 100% EQUIP 2.7 100% MISC 100% TOTAL 29.3 90% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 8.8 1st. 10.0 4.8 2.7 ROOM# LOAD TRIP KVA 11 11 11 11 1.1 0.2 0.4 1.4 0.5 0.6 0.8 0.6 0.4 0.3 07 FED FROM: 26.3 FEEDER LENGTH: FEEDER: 0 0 0 1 I 1 0 0 0 RATING RATING KVA TYPE 20/ 1 1 2 20/ 1 1.1 REC 20/ 1 3 IMP 4 20/ 1 1 1IREC NIP 10 20/ 1 0.9IREC 12 20/ 1 0.9IREC 14 20/ 1 0.9IREC 16 20/ 1 0.9IREC 111111 18 20/ 1 0.9IREC 20 20/ 1 0.8ILTS 201 1 19 24 20/ 1 1.2ILTS 28 20/ 1 0.8IREC 30 20/ 1 1.2ILTS 34 20/ 1 1.2IEQUIP 36 20/ 1 0.5IREC 38 20/ 1 0.5IREC 20/ 1 37 20/ 1 39 40 20/ 1 0.5IEQUIP 20/ 1 41 42 20/ 1' NOTES: 1 RELOCATED CIRCUIT 16471 APPENDIX VOLTAGE. 100A TRIP LOAD REV' DATE. 208Y/ 120V LUG ONLY 3 ph. 4 wire DESCRIPTION PATIENT ROOM NORTH PATIENT ROOM NORTH PATIENT ROOM NORTH PATIENT ROOM NORTH 2 BED PATIENT ROOM NORTH 2 BED PATIENT ROOM NORTH ISOLATION PATIENT ROOM NORTH ISOLATION PATIENT ROOM NORTH 2 BED PATIENT ROOM NORTH 2 BED PATIENT ROOM NORTH PATIENT ROOM NORTH NURSE STATION 2E (CB1 -43) NURSE STATION 2E (CB1 -45)" NURSE STATION 2E (CB1 -47) 2E 270 -274 (CB1 -48) NURSE STAION, MEDS MEDS REFRIGERATOR CHARTING CHARTING NURSE CALL CABINET SPARE CONN. NEC NEC LOAD PHASE (KVA) FACTOR (KVA) A: 9.9 90% B: 9.8 90% C: 9.6 90% NEC TOTAL. I 29.31 1 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS 1 1 DOUBLE LUGS 1 SPARLING, INC 8.9 8.8 8.6 26.31 10 KAIC NEC AMPS 74 73 72 73 7/21/97 PANEL SCHEDULE NAME. 3Y2 LOCATION: 3 MAIN CORRIDOR TYPE LTS EQUIP REC REC LTS LTS LTS LTS LTS LTS LTS LTS LTS LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION REC AC-6 (ON ROOF) SPARE SPARE NURSE CALL CAB 3 EAST* SPARE SPARE NURSE STATION 3 MAIN NURSE STATION 3 MAIN RMS 346, 348, 350 3 MAIN RMS 313, 315, 317, 319, 3 EAST* RMS 305, 307, 309, 311, 3 MAIN RMS 340, 342, 344, 3 MAIN OB UTILITY ROOM CEILING DELIVERY ROOM DELIVERY ROOM DELIVERY ROOM DELIVERY ROOM SPARE SPARE SPARE SPARE CONN. NEC CALCULATED (KVA) 16.1 1st. 8.8 0.2 10.5 35.6 OLYMPIC MEMORIAL HOSPITAL FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 111% NEC CALC. LOAD (KVA) 20.1 1st. 8 8 ROOM# LOAD KVA 0.4 0.2 11 11 1.2 1.2 1.0 1.0 0.4 0.8 0.8 0.8 0.8 10.5 FED FROM: 39.6 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 0 0 0 I 1 I 0 0 0 MO RI MO MO OM OM MD OM MO OE NOTES: 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 ALL CIRCUITS ARE RELOCATED FROM PANEL CBI (EXECPT CKT 1) PANEL NUMBERING STARTS AT 43 TO MATCH SECTION 2 OF PANEL CBI 0.2 VERIFY CIRCUIT IS STILL IN USE 16471 APPENDIX 100A TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 70/ 2 2 70/ 2 2 VOLTAGE. REV' DATE. LOAD KVA TYPE 1.2 1.2 1.1 1.1 1.6 1.3 1.1 1.2 1.2 1.1 1.1 11 4.0 6.5 LTS LTS REC REC LTS LTS REC LTS LTS REC REC REC MISC 208W 120V 3 ph. MISC DE2 FEED THRU LUGS DOUBLE LUGS LUG ONLY DESCRIPTION RMS 301303, 329, 331, 3 EAST* RMS 321, 327, 329, 331, 3 EAST* SPARE NURSERY NURSERY WORK ROOM NURSERY NURSERY WORK ROOM 3 MAIN 3 MAIN 3 MAIN NURSERY NURSERY WORK ROOM NURSERY WORK ROOM DE1 SPACE SPACE SPACE SPACE CONN. PHASE (KVA) A: 13.2 B: 13.5 C: 8.9 NEC TOTAL:1 35.61 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION NEC FACTOR 111% 111% 111% SPARLING, INC NEC LOAD (KVA) 14.7 15.0 9.9 1 39.61 4 wire 10 KAIC NEC AMPS 123 125 82 110 7/21 /97 M M 1111 M 11111 GM G EN r In r MN MI MN N MI r am a am PANEL SCHEDULE NAME. 4BN 1 LOCATION: ELEC/MECH ROOM 852 ROOIM LOAD TYPE DESCRIPTION I .KVA EQUIP CIRC PUMPS COOLING CP 3 4.0 EQUIP CIRC PUMPS COOLING CP-4 HVAC CU -4 CONDENSER SPARE SPACE SPACE SPACE OLYMPIC MEMORIAL HOSPITAL 4.0 21.0 TRIP RATING 15/ 3 3 3 151 3 3 3 30/ 3 3 3 2013 3 3 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 100% REC HVAC 142.0 100% 142.0 KIT 100% S. LTS 100% EQUIP 51.2 100% 51.2 MISC 100% FED FROM: 1 TOTAL 193.2 100% I 193.2 FEEDER LENGTH: FEEDER: 1 0 0 0 •1 OE On MO WM On OE MO OE •1 1110 NOTES: 16471 APPENDIX 400A BUS TRIP RATING 2 60/ 3 4 3 6 3 8 12513 10 3 12 3 14 90/ 3 16 3 18 3 20 2013 22 3 24 3 26 28 30 32 34 36 38 40 42 VOLTAGE. LOAD KVA TYPE DESCRIPTION 42.0 HVAC CHILLER ACWC -1 79.0 HVAC AC -2 CONDENSER 43.2 480Y/ 277V 3 ph. EQUIP ELEV SOILED SURGERY 40 HP SPARE SPACE SPACE SPACE SPARLING, INC 4 wire LUGS ONLY 14 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 64.4 100% 64.4 232 B: 64.4 100% 64.4 232 C: 64.4 100% 64.4 232 NEC TOTAL.1 193.21 1 193.21 232 CIRCUIT BREAKER CODE G GFCI 14 HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV FEED THRU LUGS 1 1 DATE. DOUBLE LUGS M 7/21/97 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PANELBOARDS APPENDIX 2 EXISTING PANELBOARDS WITH MODIFICATIONS SECTION 16471 PAGE 5 PANELBOARDS Nie um am so Es am IN Ea ow ma EN ow we AIN um v PANEL SCHEDULE SPARLING, INC NAME. 1A1 (EXISTING) LOCATION: 1 WEST ELEC ROOM TYPE DESCRIPTION REC RM 101 REC RM 102 REC RM 103 REC RM 104 REC RM 105 REC RM 106 REC RM 107 REC RM 108 REC RM 109 REC RM 110 REC RM 111 REC RM 112 REC RM 112 REC RM 113 REC RM 113 REC RM114 REC RM 115 REC RM 115 REC RM 116 REC NW 104" (NOTE 2) REC RM 118. LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR. LTS 10.0 125% REC 151. 10.0 100% REC 28.6 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 7.7 100% MISC 100% TOTAL 56.3 79% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 12.5 ROOM# 0 0 0 225A BUS LOAD TRIP TRIP KVA RATING RATING 0.4 20/ 1 1 2 20/ 1 0.4 20/1 3 4 20/1 0.4 20/1 5 6 20/1 0.4 20/ 1 7 8 20/ 1 0.4 20/ 1 9 10 20/ 1 0.4 20/ 1 11 12 20/ 1 0.4 20/ 1 13 14 20/ 1 0.4 201 1 15 16 20/ 1 0.4 20/ 1 17 18 20/ 1 0.4 20/ 1 19 20 20/ 1 0.4 20/ 1 21 22 20/ 1 0.4 20/ 1 23 24 20/ 1 0.4 20/ 1 25 26 20/ 1 0.4 201 1 27 28 20/ 1 0.4 20/ 1 29 30 20/ 1 0.4 20/ 1 31 32 20/ 1 0.4 20/ 1 33 34 20/ 1 0.4 20/ 1 35 36 20/ 1 0.4 20/ 1 37 38 15/ 3 0.4 20/ 1 39 40 3 0.4 20/ 1 41 42 3 NOTES: 16471 APPENDIX VOLTAGE. 208Y/ 120V 3 ph. 4 wire LUGS ONLY KAIC LOAD KVA TYPE DESCRIPTION 0.9ILTS RMS 124, 32, 33,84, CORR 127C 0.9ILTS RMS 121 21T, 26 0.9IREC ELEV PIT 1.0IREC LTS RMS 101,102 (NOTE 1) 0.9IREC RMS 101, 102, 103, LTS 100,102 0.9IREC RMS 102, 103, 104, LTS 103,104 0.9IREC RMS 104,105,106 0.9IREC RMS 105, 106, 107, LTS 105,106 0.9IREC RMS 107, 108, LTS 107,108 0.9IREC RMS 108, 109, LTS 109 0.9IREC RMS 109, 110, LTS 110 0.9IREC RMS 110 110V, 111, LTS 110V 0.9IREC RMS 112, LTS 112,115 0.9IREC RMS 113, LTS 113 0.9IREC RMS 114, 115V, LTS 114 0.9IREC RMS 115, LTS 115 0.9IREC RMS 116, LTS 116 0.9IREC RMS 111, LTS 111 3.0IEQUIP EXHAUST FAN HISTOLOGY 1 CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 19 8 79% 15.7 130 B: 18.6 79% 14.7 122 C: 17.9 79% 14.1 118 NEC T OTA L.1 56.31 1 44.51 124 1st. 10.0 DENOTES CHANGE TO CIRCUIT 14.3 NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT CIRCUIT BREAKER CODE NOTE 3 ADD NEW CIRCUIT BREAKER G GFCI H HID RATED 7.7 S SHUNT TRIP D SWITCHING DUTY FED FROM: 1 DOWNSTREAM LOAD INFORMATION 44.5 FEEDER LENGTH: 1 1 REV' FEED THRU LUGS 1 X 11A2 FEEDER: 1 1 DATE. DOUBLE LUGS 1 1 (28.6kva) 7/21/97 PANEL SCHEDULE NAME. 1A2 (EXISTING) LOCATION: 1WEST ELEC RM TYPE DESCRIPTION REC RMS 131, RMS 124,128,132 REC RMS 128, 130, HALL 127C REC RMS 125, 126, HALL 127B REC REFRIG RM 125 REC RMS 123, 126, LTS 123 EQUIP INSTA WARM RM 123 EQUIP MICROWAVE RM 123 SPARE REC RMS 118,120,121,123, LTS 118 REC RMS 124, 126, 127A REC RMS 121,124,126 EQUIP EWC RM 124 REC REFRIG RM 121 REC RMS 121, 122, LTS 121 SPARE REC RMS 118, 121T, 129, LTS 118 REC RMS 118, 121, HALL 100E, LTS 118 REC RMS 117, LTS 117 REC RMS 138, CORR WEST 126,139 REC RMS 143, CORR* (NOTE 1) LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR LTS 8.2 125% REC 1s1. 10.0 100% REC 5.7 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 4.7 100% MISC 100% TOTAL 28.6 97% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 10.3 1st. 10.0 2.9 4.7 ROOM# LOAD KVA 0.9 0.9 0.9 11 0.8 1.0 0.8 1.7 1.0 0.7 0.9 0.6 0.8 0.4 0.6 0.6 0.9 0.9 0.7 FED FROM: 27.8 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 30/ 1 40/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 201 1 20! 1 20/ 1 20! 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 NOTES: DENOTES CHANGE TO CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 225A BUS TRIP RATING 20! 1 20/ 1 20/ 1 20! 1 20/ 1 20/ 1 20/ 1 20! 1 20/ 1 20/ 1 20! 1 20! 1 20/ .1 2011 201 1 20/ 1 20! 1 201 1 20/ 1 20! 1 VOLTAGE. REV' DATE. LOAD KVA TYPE 1.11REC 1.1IREC 1.2ILTS 1.4ILTS 0.3ILTS 0.2ILTS 0.8IEQUIP 0.8IEQUIP 0.6 0.3 1.1 1.1 1.1 0.9 0.2 0.2 LTS LTS LTS LTS LTS LTS REC REC 208Y1 120V PHASE A. B: C: NEC TOTAL. I 3 ph. LUGS ONLY DESCRIPTION BSMT BSMT RMS 112,113 RMS 114,115 1st FLOOR NORTH 1st FLOOR SOUTH INSTA WARM RM 118 SPARE INSTA WARM RM 133A RM 101 RMS 1167, 1177 RMS 1091, 1110, 110T, 110Y, 111 RMS 107, 107T, 108, 109 RMS 104, 105, 105T, 106 101T,102,103,103T RM 100B BSMT ELEV PIT SPARE SPARE SPARE SPACE CONN. NEC NEC LOAD (KVA) FACTOR (KVA) 10.5 97% 9.4 97% 8.7 97% 28.61 1 CIRCUIT BREAKER CODE G GFCI H HID RATED 9 SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS 1 1 DOUBLE LUGS 1 1 SPARLING, INC 10.2 9.1 8.5 27.81 4 wire KAIC NEC AMPS 85 76 70 77 7/21/97 OM I M r MN MN i- NM 11111 i- I NM IIIIII NM MI M- O E OM ME MI MN E OM NM PANEL SCHEDULE NAME. 1A5 (SECT 1) (EXISTING) LOCATION: SHORT STAY TYPE REC REC REC REC EQUIP EQUIP REC REC REC EQUIP REC REC REC REC REC 'REC REC REC REC EQUIP LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION STAFF /ADMISSIONS (NOTE 1) AQUAR/ADMISSIONS (NOTE 1) ENDOSCOPY ENDO /STAFF MICROWAVE STAFF RM REFRIG STAFF RM CORR/ SOUTH UTILITY CL. UTILITY/EQUIP/ENDO CLEAN UP (NOTE 1) OFFICE/EQUIP ICE MACHINE CLEAN UTILITY LTS PENTHOUSE HVAC -3 LTS PENTHOUSE HVAC -3 PATIENT RMS 1429, 26 (NOTE 1) PATIENT RMS 1429, 27 (NOTE 1) PATIENT RMS 1427, 26 (NOTE 1) PATIENT RMS 1424, 21 (NOTE 1) PATIENT RMS 1424, 23 (NOTE 1) PATIENT RMS 1423, 21 (NOTE 1) MICROWAVE CLEAN UTILITY SPARE EF -9 SHORT STAY CONN. NEC CALCULATED NEC CALC. (KVA) FACTOR LOAD (KVA) 11.8 125% 14.7 1st. 10.0 100% 1st. 10.0 33.4 50% 16.7 100% 100% 100% 18.7 100% 18.7 100% 73.8 81% OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD KVA 11 0.5 0.9 1.1 1.2 0.7 1.1 11 0.9 1.0 0.4 1.0 1.1 1.1 1.1 1.1 11 1.1 1.2 1.2 FED FROM. 60.1 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/.1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 2011 20/ 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 MO MO OE NE On NOTES: 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 225A BUS TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 2011 20/ 1 20/ 1 20/ 1 2011 20/ 1 20/ 1 20/ 1 2011 VOLTAGE. REV' DATE. LOAD KVA TYPE 1.2 1.0 0.9 14 1.4 0.9 0.8 0.9 0.7 1.1 0.9 1.1 0.9 11 0.8 1.1 1.1 1 I I 208Y/ 120V 3 ph. LUGS ONLY SPARLING, INC DESCRIPTION EQUIP ENDO CLEAN UP #18 (NOTE 2) LTS SHORT STAY PATIENT RMS NORTH (NOTE 2) LTS PATIENTS RMS NORTHWEST LTS SHORT STAY WAIT /STAFF LTS SHORT STAY PATIENT RMS LTS PATIENTS RMS NORTHEAST LTS PED SOUTH HOLD REC NURSE STATION REC NURSE STATION REC PED SOUTH HOLD REC PED SOUTH HOLD REC PATIENT RMS 1405, 07 (NOTE 1) REC WAITING/TOILET (NOTE 1) SPARE (NOTE 1) REC PATIENT RMS 1405, 07 (NOTE 1) EQUIP TV AMP SPARE SPARE SPARE REC PATIENT RMS 1432, 30 (NOTE 1) REC PATIENT RMS 1432, 30 (NOTE 1) CONN. NEC NEC LOAD PHASE (KVA) FACTOR (KVA) A: 28.7 81% 23.3 B: 23.1 81% 18.8 C: 22.0 81% 17.9 NEC TOTAL 1 73.81 1 60.11 CIRCUIT BREAKER CODE G GFC1 H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS 1 X 11A5 (SECT 2) DOUBLE LUGS 1 I 10 KAIC NEC AMPS 194 156 149 167 (36.5kva) 7/21/97 PANEL SCHEDULE (NAME. 1A5 (SECT 2) (EXISTING) LOCATION: SHORT STAY `TYPE DESCRIPTION EQUIP HOT POT EQUIP TOASTER SPARE LTS SHORT STAY PATIENT RMS N. (NOTE 3) LTS SHORT STAY PATIENT RMS S (NOTE 3) LTS SHORT STAY PATIENT ROOMS" (NOTE 3) LTS SHORT STAY OR #7 SUPPORT* (NOTE 3) REC SHORT STAY PATIENT RMS N. (NOTE 3) REC SHORT STAY PATIENT RMS N. (NOTE 3) REC SHORT STAY PATIENT RMS N. (NOTE 3) REC SHORT STAY PATIENT RMS N. (NOTE 3) REC SHORT STAY PATIENT RMS S (NOTE 3) REC SHORT STAY PATIENT RMS S (NOTE 3) REC SHORT STAY CHAIR ROOM (NOTE 3) REC SHORT STAY CHAIR ROOM (NOTE 3) EQUIP SUB STERILE STERILIZER (NOTE 3) EQUIP SUB STERILE FLUID WARMER (NOTE 3) SPARE" (NOTE 3) EQUIP CLEAN UP WASHER (NOTE 3) LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD TRIP KVA RATING 1.0 201 1 1.0 20/ 1 20/ 1 1.4 20/ 1 11 20/1 0.7 20/ 1 1.4 2011 0.9 2011 0.9 20/ 1 0.9 20/ 1 0.9 201 1 0.9 201 1 0.9 20! 1 0.7 20/ 1 0.7 20/ 1 1.1 201 1 1.6 20/ 1 201 1 6.2 40/3 3 3 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 0 0 0 MO OE MO ON 1111 OE MO OE MO OE MO OE 225A BUS TRIP RATING 44 20/ 1 46 20/ 1 48 20/ 1 50 20/ 1 52 20/ 1 54 20/ 1 56 20/ 1 58 20/1 60 20/ 1 62 20/ 1 64 20/ 1 66 20/ 1 68 20/ 1 70 20/ 1 72 20/ 1 74 20/ 1 76 78 80 82 84 VOLTAGE. 208Y1 120V 3 ph. 4 wire LUGS ONLY KAIC LOAD KVA TYPE DESCRIPTION 1 1 REC PATIENT RMS 1408,11 "(NOTE 1) 1 1 REC PATIENT RMS 1408,10 "(NOTE 1) 1 1IREC PATIENT RMS 1410, 11 "(NOTE 1) 1.1 jREC PATIENT RMS 1413,16 "(NOTE 1) 1.1 REC PATIENT RMS 1413,14 "(NOTE 1) 1.1 REC PATIENT RMS 1414,16 *(NOTE 1) 1.6 REC SHORT STAY (NOTE 3) 0.9 REC SHORT STAY (NOTE 3) 1.2 REC 8 LTS SHORT STAY (NOTE 3) 1.4 REC CHAIR ROOM (NOTE 3) 1.0 EQUIP IRRIGATION CONTROLLER (NOTE 3) 0.7 EQUIP EF -5 ROOF* (NOTE 3) 0.8 LTS OR #7 SPARE (NOTE 3) SPARE (NOTE 3) SPARE (NOTE 3) SPACE SPACE SPACE SPACE SPACE SPARLING, INC CONN. NEC CALCULATED NEC CALC. CONN. NEC NEC LOAD NEC (KVA) FACTOR LOAD (KVA) NOTES: PHASE (KVA) FACTOR (KVA) AMPS 5.4 125% 6.7 A: 14.8 92% 13.6 113 1sT. 10.0 100% 1st. 10.0 DENOTES CHANGE IN CIRCUIT B: 12.4 92% 11 4 95 8.6 50% 4.3 NOTE 1 MODIFY EXISTING CIRCUIT C: 9.3 92% 8.6 71 100% NOTE 2 ADD LOAD TO EXISTING SPARE NEC TOTAL.' 36.51 1 33.61 93 100% CIRCUIT CIRCUIT BREAKER CODE 100% NOTE 3 ADD NEW CIRCUIT BREAKER G GFCt H HID RATED 12.6 100% 12.6 S SHUNT TRIP D SWITCHING DUTY 100% FED FROM: 1 11 DOWNSTREAM LOAD INFORMATION 36.5 92% 33.6 FEEDER LENGTH: 1 1 REV' I!FEED THRU LUGS 1 FEEDER: 1 1 DATE. IIDOUBLE LUGS 1 16471 APPENDIX 7/21/97 w MO OM NM NM i NE NM i I E MN I i NM i- i MI MN ME I i NM IIIII 1PANEL SCHEDULE INAME. 1Y1 (EXISTING) I LOCATION: 1 WEST ELEC ROOM TYPE DESCRIPTION REC CRASH CART REC NURSE STATION 133A REC CRASH CART REC CRASH CART REC NURSE STATION 118 REC RM 101 REC RM 101 REC RM 101 IREC RM 102 IREC RM 102 IREC RM 102 IREC RM 103 IREC RM 103 IREC RM 103 REC RM 104 REC RM 104 REC RM 104 REC RM 105 REC RM 105 REC RM 105 IREC RM 106 LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR ILTS 8.2 125% REC 1st. 10.0 100% REC 18.9 50% HVAC KIT S. LTS EQUIP 4.7 MISC TOTAL 41.8 100% 100% 100% NEC CALC. LOAD (KVA) 10.3 1st. 10.0 9.5 0.2 0.4 0.2 0.2 0.4 0.4 0.4 0.2 0.4 0.4 0.2 0.4 0.4 0.2 0.4 0.4 0.2 0.4 0.4 0.2 0.4 100% 4.7 100% FED FROM: 82% 34.4 FEEDER LENGTH: FEEDER: ROOM# LOAD TRIP 225A KVA RATING 20/ 1 1 20/ 1 3 20/ 1 5 20/ 1 7 20/ 1 9 201 1 11 20/ 1 13 20/ 1 15 20/ 1 17 20/ 1 19 20/ 1 21 20/ 1 23 20/ 1 25 20/ 1 27 20/ 1 29 20/ 1 31 20/ 1 33 20/ 1 35 20/ 1 37 20/ 1 39 20/ 1 41 0 0 0 VOLTAGE. 1 MN On ON NO UM NM MN NM NIP ON MO NM OM NOTES: DENOTES CHANGE TO CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 225A BUS TRIP RATING 2 20/ 1 4 20/ 1 6 20/ 1 8 20/ 1 10 20/ 1 12 20/ 1 14 20/ 1 16 20/ 1 18 20/ 1 20 20/ 1 22 20/ 1 24 20/ 1 26 20/ 1 28 20/ 1 30 20/1 32 20/ 1 34 20/ 1 36 20/ 1 38 20/ 1 40 20/ 1 42 20/ 1 REV' DATE. 208Y/ 120V 3 ph. SPARLING, INC 225A BREAKER KAIC LOAD KVA TYPE DESCRIPTION 0.4IREC RM 106 0.2 REC RM 106 0.4 REC RM 107 0.4IREC RM 107 0.2(REC RM 107 0.4IREC RM 108 0.4IREC RM 108 0.21REC RM 108 0.4IREC RM 109 0.4IREC RM 109 0.2IREC RM 109 0.4IREC RM 110 0.4IREC RM 110 0.2IREC RM 110 0.4IREC RM 111 0.4IREC RM 111 0.2IREC RM 111 0.4IREC RM 124 COMPUTER 0.4IREC RM 124 COMPUTER 0.2ILTG RM 116, NW 104* (NOTE 1) 0.2)LTG RM 133A,B CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 15.7 82% 12.9 108 8: 12.6 82% 10.4 86 C: 13.9 82% 11.4 95 NEC TOTAL. I 42.21 34.71 96 CIRCUIT BREAKER CODE G GFCI H HID RATED 9 SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS 1 X 11A2 (28.6kva) DOUBLE LUGS I 1 OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE NAME. 1Y2 (EXISTING) LOCATION: 1 WEST ELEC ROOM TYPE REC REC REC REC REC REC REC REC REC REC REC REC REC REC REC REC REC REC REC REC REC LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION NURSE STATION 113B NURSE STATION 113B NURSE STATION 113B COMPUTER CORR 100B CORR 1008 NURSE STATION 113A NURSE STATION 113A NURSE STATION 113A NURSE STATION 113A NURSE STATION 118 NURSE STATION 118 NURSE STATION 118 CORR 100D CORR, COPY MACHINE RM 112 RM 112 RM 112 RM 112 RM 113 RM 113 RM 130 FILM ILLUMINATOR CONN. NEC CALCULATED (KVA) FACTOR 11.8 125% 1st. 10.0 100% 18.5 50% 100% 100% 100% 7.8 100% 100% 48.1 87% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 14.8 1st. 10.0 9.3 7.8 41.8 ROOM# LOAD TRIP KVA RATING 0.4 0.4 0.4 0.2 0.2 0.4 0.4 0.4 4.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.41 0.41 0.41 0.41 FED FROM: FEEDER LENGTH: FEEDER: 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 U- MO MO NOTES: DENOTES CHANGE TO CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 225A BUS TRIP RATING 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/2 2 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 2011 20/ 1 2011 2011 VOLTAGE. REV DATE. 208Y/ 120V 3 ph. LUGS ONLY LOAD KVA TYPE DESCRIPTION 0.51LTS RM 110,117 0.61LTS RM 107,108,109 0.51LTS RM 105,106 0.71LTS RM 102,103,104 0.31LTS RM 101 1.01LTS RM 112, 113, 114, 115 3.11EQUIP TREAD MILL (REC RM 143 0.41REC RM 113 0.41REC RM 113 0.41REC RM 114 0.41REC RM 114 0.41REC RM 115 0.41REC RM 115 0.41REC RM 115 0.41REC RM 115 0.41REC RM 116 0.41REC RM 116 0.41REC NW 104* (NOTE 2) 0.4IREC NW 104* (NOTE 2) CONN. NEC NEC LOAD PHASE (KVA) FACTOR (KVA) A: 17.5 87% B: 16.1 87% C: 14.6 87% NEC TOTAL.' 48.11 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS 1 X 11A2 DOUBLE LUGS 1 1 SPARLING, INC 15.2 13.9 12.7 41.81 4 wire KAIC NEC AMPS 126 116 106 116 (28.6kva) 7/21/97 ow um so \Ur mu um EN ow no NIN am NE EN um ow ow Ns N ii MS I IMF M WA NM l MR MI 1111111 PANEL SCHEDULE SPARLING, INC NAME. 1Y3 (EXISTING) LOCATION: 1st FLOOR ELEC ROOM ROOMW LOAD TYPE DESCRIPTION KVA REC RM 135 0.4 REC RMS 100G, 135, 138 0.2 REC 118 COMPUTER 0.2 EQUIP NURSE CALL CAB. 2 RM 125 0.5 EQUIP NURSE CALL CAB. 2 RM 123 0.5 REC CHARTING (NOTE 2) 0.7 SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPACE SPACE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 1.5 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 1.0 100% 1.0 TRIP RATING 201 1 2011 201 1 201 1 20/ 1 20/ 1 20/ 1 2011 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 MO OE MO ON SO ON 1 OE MO OM NOTES: OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 1st. 1.5 DENOTES CHANGE TO CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 225A BUS TRIP RATING 201 1 20/ 1 2011 20/ 1 20/ 1 20/ 1 VOLTAGE. 208Y/ 120V LOAD KVA TYPE SPARE SPARE SPARE SPARE SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE 3 ph. LUGS ONLY DESCRIPTION CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 0.9 100% 0.9 7 B: 0.7 100% 0.7 6 C: 0.9 100% 0.9 8 NEC TOTAL 1 2.51 1 2.51 7 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY MISC 100% FED FROM: I 1 DOWNSTREAM LOAD INFORMATION TOTAL 2.5 100% 2.5 (FEEDER LENGTH: 1 1. REV' FEED THRU LUGS 'FEEDER: 1 1 DATE, 1 DOUBLE LUGS 4 wire KAIC 7/21/97 'PANEL SCHEDULE 1NAME. 2A1 (EXISTING) (LOCATION: 2 WEST ELEC RM TYPE DESCRIPTION REC RM 201 REC RM 202 REC RM 203 REC RM 204 REC RM 205 REC RM 206 REC RM 207 REC RM 208 REC RM 209 REC RM 210 REC RM 211 REC RM 212 REC RM 213 REC RM 214 REC RM 215 REC RM 216 REC RM 217 REC RM 218 REC RM 219 REC RM 220 REC RM 221 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 10.0 100% REC 10.7 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 0.5 100% MISC 100% TOTAL 21.2 75% OLYMPIC MEMORIAL HOSPITAL ROOM# 0 0 0 225A BUS LOAD TRIP TRIP KVA RATING RATING KVA TYPE DESCRIPTION 0.21 20/ 1 1 2 20/ 1 0.91REC RM 202 0.2 20/ 1 3 4 20/ 1 0.91REC RM 203 0.2 20/ 1 5 6 20/ 1 0.9 REC RM 204 0.2 20/ 1 7 8 20/ 1 0.9 REC RM 205 0.2 20/ 1 9 10 20! 1 0.91REC RM 206 0.2 20/ 1 11 12 20/ 1 0.91REC RM 207 0.2 20/ 1 13 14 20/ 1 0.91REC RM 208 0.2 20/ 1 15 16 20/ 1 0.91REC RM 209 0.2 20/ 1 17 18 20/ 1 0.9IREC RM 210 0.2 20/ 1 19 20 20/ 1 0.9IREC RM 211 0.2 20/ 1 21 22 20/ 1 0.91REC RM 212 0.2 20/ 1 23 24 20/ 1 0.91REC RM 213 0.2 20/ 1 25 26 20/ 1 0.91REC RM 214 0.2 20/ 1 27 28 20/ 1 0.91REC RM 215 0.2 20/ 1 29 30 201 1 0.91REC RM 216 0.2 20/ 1 31 32 201 1 0.91REC RM 217 0.2 20/ 1 33 34 20/ 1 0.91REC RM 218 0.2 20/ 1 35 36 20/ 1 0.91REC RM 219 0.2 20/ 1 37 38 20/ 1 0.71REC EXAM (NOTE 1) 0.2 20/ 1 39 40 20/ 1 0.51EQUIP TV AMPS* (NOTE 1) 0.2 20/ 1 41 42 20/ 1 (REC SPARE* (NOTE 1) CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 7 4 75% 5.5 46 B: 7.2 75% 5.4 45 C: 6.7 75% 5.0 41 NEC TOTAL.' 21.21 1 15.91 44 CIRCUIT BREAKER CODE G GFCI H HID RATED 0.5 S SHUNT TRIP D SWITCHING DUTY FED FROM 1 11 DOWNSTREAM LOAD INFORMATION 15.9 FEEDER LENGTH: 1 1 REV FEED THRU LUGS 1 I FEEDER: 1 1 DATE. DOUBLE LUGS 1 1 ON MI 11 MN MO OM ■1 OE NOTES: 1st. 10.0 DENOTES CHANGE IN CIRCUIT 5.4 NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 16471 APPENDIX VOLTAGE. SPARLING, INC 208W 120V 3 ph. 4 wire LUGS ONLY KAIC LOAD 7/21/97 MIN 11P1 Ili@ NM 'Mt INN MR 111111 wort, an lot wro ma MO Ilia IMO I•111 INII Not my wig am an On re los NM am INF NW INN MN !PANEL SCHEDULE NAME. 2A2 (EXISTING) LOCATION: 2 WEST ELEC RM TYPE DESCRIPTION REC LTS RMS 231A, 200B (NOTE 1) REC RMS 200C, D, 233, 234* (NOTE 1) REC RMS 229, 232 (NOTE 1) REC RMS 200D, E, 232, LTS 232 SPARE SPARE LTS RELAY REC RMS 230, 231A REC NURSE STATION, 228, LTS 228 REC RMS NW260* (NOTE 1) REC 200A, NURSE STATION 228, LTS REC REFRIG 222 REC RMS 200F, 222, 223, 224 EQUIP EWC CORRIDOR 200A REC RMS 222, 2224, 226 REC RMS 222, 222T REC RMS 221, 221V REC RMS 220, 221 REC RMS 220C, 220, LTS 220 REC RMS 200H, VEST, 237.238 LOAD CONN. TYPE (KVA) LTS 8.0 REC 1st. 10.0 REC 10.6 HVAC KIT S. LTS EQUIP MISC TOTAL 31.5 NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 2.9 100% 100% 89% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 10.0 1st 10.0 5.3 2.9 ROOMW LOAD TRIP KVA RATING 1.2 0.9 0.9 0.9 0.5 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.7 0.9 0.9 0.9 0.9 FED FROM: 28.2 FEEDER LENGTH: FEEDER: 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20! 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 MN ■1 WO MN WM OM NIP NOTES: 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 225A BUS TRIP RATING 2011 20/ 1 20! 1 2011 201 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 VOLTAGE. REV DATE. 208Y/ 120V 3 ph. LOAD KVA TYPE DESCRIPTION 1.0 LTS RMS 200D, 230 1.OI1_TS RMS 200A, 222 1.0 LTS RMS 220T, 221, T &V, 222 1.0 LTS RMS 211, 219 1.0 LTS RMS 201T, 201V 1.0 LTS RMS 202, 210 1.0 LTS RMS 202, 210 0.9 REC RMS 232 LTS 232 (NOTE 1) 1.0 EQUIP INSTA WARM RM 232 1.2 REC MICROWAVE RM 232 0.5 LTS ROOF MECH RM 1.0 EQUIP INSTA WARM RM 222 SPARE 0.8 REC LTS CLEAN LINEN (NOTE 2) 1.0 REC LTS MEDS (NOTE 2) 0.6 REC LTS SOILED (NOTE 2) 0.7 REC SOILED (NOTE 2) SPARE SPARE SPARE 0.9 REC ROOF PHASE A: B: C: NEC TOTAL. 1 G GFCI 3 SHUNT TRIP N FEED THRU LUGS DOUBLE LUGS LUGS ONLY CONN. NEC NEC LOAD (KVA) FACTOR 10.1 89% 10.1 89% 11.3 89% 31.51 1 (KVA) 9.0 9.1 10.1 28.21 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION 1 1 M 1 SPARL1NG, INC 4 wire KAIC NEC AMPS 75 76 84 78 7/21/97 PANEL SCHEDULE NAME. 41A1 (EXISTING) LOCATION: 1 WEST ELEC ROOM TYPE LTS LTS LTS LTS LTS LTS LTS LTS LTS LTS LOAD TYPE LTS REC REC 'HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION RMS 118, 20, 22, 23, 25, 26, 28 RM 138 CORR. 100A BSMT BSMT EXTIOR FRONT POST CORR C102, 03, 04, 05, 07, 08 (NOTE 2) OR#1 (NOTE 3) OR #2 (NOTE 3) OR #3 (NOTE 3) CONN. (KVA) 60.1 60.1 OLYMPIC MEMORIAL HOSPITAL NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 125% NEC CALC. LOAD (KVA) 75.1 ROOMN LOAD KVA 2.0 2.0 2.0 2.0 2.0 2.0 1.6 0.9 0.9 0.9 FED FROM: 75.1 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 NOTES: REPLACE PANEL WITH 30 CKT PANEL DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 0 0 0 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 125A BUS TRIP RATING 20/ 1 20/ 1 20/ 1 20! 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 VOLTAGE. REV' DATE. LOAD KVA TYPE 2.0 2.0 2.0 2.0 2.9 4.2 0.9 .0.9 0.9 LTS LTS LTS LTS LTS LTS LTS LTS LTS 480W 277V 3 ph. G GFCI 5 SHUNT TRIP LUGS ONLY DESCRIPTION RMS 107 111 RMS 102 106 RM 101 RMS 116 NW 104" (NOTE 1) SPARE SURGY AREA, BASMT STOR SURGY AREA, BIOMED STOR OR #4" (NOTE 3) OR #5 (NOTE'3) OR #6 (NOTE 3) SPARE (NOTE 3) SPARE (NOTE 3) SPARLING, INC (NOTE 2) (NOTE 2) 4 wire KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 26.5 125% 33.1 120 B: 15.8 125% 19.8 71 C: 17.8 125% 22.3 80 NEC TOTAL. I 60.11 I 75.11 90 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS 1 X 142A1 DOUBLE LUGS I (26.0kva) 7/21/97 sr am KW AM Ws ma, mai Cm MN will MO EN UN mir No tog as am ma OIL OK Olt unto am wgs_ ais MN ill= PANEL SCHEDULE NAME. 41Y1 (EXISTING) LOCATION: 1WEST ELEC RM TYPE DESCRIPTION LTS ROOM 118 LTS RECOVERY, SURGERY (NOTE 2) LTS ROOM 143 LTS OR #6 (NOTE 2) LTS OR #4* (NOTE 2) LTS OR #5 (NOTE 2) SPARE LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR LTS 13.5 125% REC 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 0.6 100% MISC 100% TOTAL 14.1 124% NEC CALC. LOAD (KVA) 16.9 0.6 ROOM# LOAD KVA 0.4 3.0 0.4 1.7 I 1.7 I 1.7 FED FROM: 17.5 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 MN MO U. ■I U. OM MO MO IN IN NOTES: I 225A BUS TRIP RATING 2 125/ 3 4 3 6 3 8 20/ 1 10 20/ 1 12 20/ 1 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER VOLTAGE. 480Y/ 277V 3 ph. 4 wire LUGS ONLY LOAD KVA TYPE DESCRIPTION 0.6 EQUIP XFRER T3 17 1.7 1.2 LTS OR #1 (NOTE 2) LTS OR #2 (NOTE 2) LTS OR #3 (NOTE 2) SPACE G GFCI S SHUNT TRIP CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 4.0 124% 5.0 18 B: 6.6 124% 8.2 30 C: 3.5 124% 4.3 16 NEC TOTAL.' 14.11 1 17.51 21 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV' FEED THRU LUGS I DATE. DOUBLE LUGS I SPARLING, INC OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 KAIC PANEL SCHEDULE NAME. 42A1 (EXISTING) LOCATION: 2 WEST ELEC RM TYPE LTS LTS LTS LTS LTS LTS LTS LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION RMS 211 219 RMS 202 210 RMS 201 235 *(NOTE 1) RMS 220, 221 2 MAIN CORRIDOR (NOTE 2) OUTSIDE SPARE CONN. (KVA) 26.0 26.0 OLYMPIC MEMORIAL HOSPITAL NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 125% NEC CALC. LOAD (KVA) 32.5 ROOM LOAD KVA 2.0 2.0 2.0 2.0 2.1 2.0 FED FROM 32.5 FEEDER LENGTH: FEEDER: TRIP RATING 201 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 0 0 0 2 3 5 6 9 10 11 12 13 IP. 14 15 16 17 18 19 20 21 22 23 24 25 0. 26 27 28 29 30 31 f. 32 33 34 35 36 37 38 39 40 41 42 NOTES: DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 16471 APPENDIX VOLTAGE. 125A BUS TRIP LOAD RATING KVA TYPE 2011 2.0 LTS 20/ 1 2.0 LTS 2011 2.0 LTS 20/ 1 2.0 LTS 20/ 1 1.9 LTS 20/ 1 1 1 LTS 20/ 1 2.9 LTS REV' DATE. 480Y/ 277V 3 ph. LUGS ONLY DESCRIPTION CORR 2 -A-C, E-G RMS 227 34 (NOTE 1) RMS 223 26 (NOTE 1) RM 242 PATIENT ROOM SOUTH (NOTE 2) 2 MAIN CORE (NOTE 2) PATIENT ROOMS NORTH (NOTE 2) CONN. NEC NEC LOAD PHASE (KVA) FACTOR (KVA) A: 10.9 125% B: 8.0 125% C: 71 125% NEC TOTAL. I 26.01 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS I I (DOUBLE LUGS I I SPARLING, INC 13.6 10.0 8.9 32.51 4 wire KAIC NEC AMPS 49 36 32 39 7/21/97 air MIK OW WM UM NS tea' Ig M' OW 110w UM Els um a. am 4•11 Nei wit IND 1110 ela 110 Or MI 1 111111 1PANEL SCHEDULE (NAME. 42X1 (EXISTING) 'LOCATION: 2 WEST ELEC RM LOAD TYPE DESCRIPTION KVA LTS BSMT 1 1 1 LTS BSMT 0 LTS BSMT RM 004A, B 0 LTS RMS 231 242 0 LTS RMS 135,138 0.51 LTS CORR C102, 103, 104, 105, 107, 108 (NOTE 2) 0.9 LTS CORR PATIENT AREA (NOTE 2) 1.5 ROONW 0 0 0 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 4.9 125% 6.1 REC 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 4.8 100% 4.8 MISC 100% FED FROM: TOTAL 9.7 113% 10.9 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 OE Ma MO SO ■I OM OE OE MO NOTES: 125A BUS TRIP RATING 2 25/ 3 4 3 6 3 8 20/ 1 10 20/ 1 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER VOLTAGE. LOAD KVA TYPE DESCRIPTION 4.8 EQUIP XFRER T4 SPARE (NOTE 3) SPARE (NOTE 3) SPACE SPACE CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV FEED THRU LUGS I I DATE. DOUBLE LUGS I I SPARLING, INC 480W 277V 3 ph. 4 wire LUGS ONLY KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 4.8 113% 5.4 20 B: 2.2 113% 2.5 9 C: 2.7 113% 3.0 11 NEC TOTAL. I 9.7 1 10.91 13 OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE NAME. 42Y1 (EXISTING) LOCATION: 2 WEST ELEC/MECH RM TYPE DESCRIPTION LTS RM 228, 232, 236 LTS 2 MAIN NURSE STATION SPARE SPARE SPARE SPARE SPARE OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD KVA 0.9 1.5 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 2.4 125% 3.0 REC 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FED FROM: TOTAL 2.4 125% 3.0 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 1 2 20/1 3 4 20/1 5 6 20/ 1 7 10. 8 20/ 1 9 10 20/ 1 11 12 20/ 1 13 14 15 16 17 18 19 20 21 ■u 22 23 24 25 26 27 28 29 30 31 32 33 ■g 34 35 36 37 38 39 40 41 42 0 0 0 NOTES: 16471 APPENDIX DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER VOLTAGE. 125A BUS TRIP RATING 480W 277V 3 ph. LUGS ONLY LOAD KVA TYPE DESCRIPTION SPARE SPARE SPACE SPACE SPACE SPACE SPACE SPARLING, INC 4 wire KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 0.9 125% 1.1 4 B: 1.5 125% 1.9 7 C: 125% NEC TOTAL. I 2.41 I 3.01 4 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV I FEED THRU LUGS I I DATE. IIDOUBLE LUGS I I 7/21/97 OW 4•11) Ai* MN wit list 41111# INK IS Mr illtS 1111111 MI Nig 111111) IN* MN, ea mu ant MU dr. lati MI INN IIIIIP Nig Nit AN 11111 111111 PANEL SCHEDULE SPARLING, INC NAME. 4L2 (EXISTING) LOCATION: 1st FLOOR LAB TYPE DESCRIPTION KVA SPARE SPARE SPARE EQUIP SUB STERILE WASHER (NOTE 3) SPACE SPACE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 16.0 125% 19.9 REC 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 10.8 100% MISC 100% TOTAL 26.8 115% LOAD ROOM# 10.8 0 0 0 100A TRIP TRIP RATING RATING 20/ 1 1 2 20/ 1 20/ 1 3 4 20/ 1 20/1 5 6 20/1 2013 7 8 20/ 1 3 9 10 20/ 1 3 11 12 20/ 1 13 14 15 16 17 18 19 20 21 22 23 24 25 r 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 NOTES: DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE VOLTAGE. 480Y1 277V 3 ph. 4 vie LOAD KVA TYPE DESCRIPTION 4.2 LTS CORRIDORS (NOTE 1) 3.7 LTS ADMIT/LOBBY 3.8 LTS OFFICE/HIST/MICRO 4.3 LTS LAB/LOCKERS SPARE SPARE SPACE SPACE LUGS ONLY KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 12.1 115% 13.8 50 B: 7.3 115% 8.4 30 C: 7 4 115% 8.5 31 NEC TOTAL. I 26.81 I 30.71 37 CIRCUIT CIRCUIT BREAKER CODE NOTE 3 ADD NEW CIRCUIT BREAKER G GFCI H HID RATED 10.8 S SHUNT TRIP D SWITCHING DUTY FED FROM: 1 I DOWNSTREAM LOAD INFORMATION 30.7 FEEDER LENGTH: I I REV' I FEED THRU LUGS FEEDER: I 1 DATE 1 DOUBLE LUGS I I OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7141!97 PANEL SCHEDULE NAME. AA (EXISTING) LOCATION: 2 EAST 'TYPE REC REC REC REC REC LTS SPARE LTS LTS SPARE* (NOTE 1) EQUIP EF #9 EQUIP HVAC #6 EQUIP EF #10 EQUIP EF #12 SPARE DESCRIPTION LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 5.9 125% 7 4 REC 1st. 7.2 100% 1st. 7.2 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 23.9 100% 23.9 MISC 100% TOTAL 37.0 104% OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD KVA 0.71 0.7 0.7 0.9 0.9 1.2 1.2 0.9 13.8 1.8 0.5 0.9 0 0 0 225A BUS TRIP TRIP RATING RATING 20/ 1 1 2 20/ 1 20/ 1 3 4 20/ 1 20/ 1 5 6 20/ 1 20/ 1 7 8 20/1 20/ 1 9 .g 10 20/ 1 20/ 1 11 12 20/ 1 20/ 1 13 .M 14 20/ 1 20/ 1 15 16 20/ 1 20/ 1 17 18 20/3 20/ 3 19 20 3 3 21 22 3 3 23 24 35/ 3 100/ 3 25 ON 26 3 3 27 28 3 3 29 30 20/ 3 20/ 3 31 32 3 3 33 34 3 3 35 36 40/ 3 20/ 1 37 38 3 20/ 1 39 40 3 20/ 1 41 42 NOTES: DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 16471 APPENDIX VOLTAGE. 208Y/ 120V 3 ph. LUGS ONLY LOAD KVA TYPE 0.7 REC 0.7 REC 0.5 REC 0.9 REC 1.2 LTS 0.6 LTS 0.8 LTS 0.4 REC 5.1 1.8 SPARE (NOTE 1) EQUIP EF (KITCHEN) EQUIP EF #4 SPARE G GEC( S SHUNT TRIP DESCRIPTION CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 12.0 104% 12.5 104 B: 13.5 104% 14.0 117 C: 11.5 104% 11.9 99 NEC TOTAL. I 37.0 I 38.51 107 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY IFED FROM: DOWNSTREAM LOAD INFORMATION 38.5 FEEDER LENGTH: I I REV' FEED THRU LUGS FEEDER: DATE. ODOUBLE LUGS SPARLING, INC 4 wire KAIC 7/21/97 MO AM 111M, 111.11 11111. MI Mt 4MIS im Nit low st Ile PANEL SCHEDULE NAME. BM (EXISTING) LOCATION: ELEC ROOM BOO4A TYPE REC REC LTS REC REC REC REC REC REC REC LTS REC REC REC REC LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL STORES STORES STORES HEALTHY U CARDIAC CARDIAC REHAB TREADMILL TREADMILL STORAGE, OFFICE (NOTE 2) MED GAS, EXTERIOR (NOTE 2) STORE RM NEW LIFE LINE OFFICE COMP SYS REFRIG PHARMACY NORTH WALL PHARMACY SPARE SPARE SPARE SPARE CONN. (KVA) 4.4 1st. 10.0 12.5 26.9 DESCRIPTION NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 81% NEC CALC. LOAD (KVA) 5.5 1st. 10.0 6.3 21.8 ROOM,/ LOAD KVA 0.41 0.91 111 1.1 11 1.1 1.0 1.0 1.3 0.4 1.1 1.1 FED FROM: FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 2011 20/ 1 20/ 1 20/ 1 20/ 1 20/ 2 2 0 0 0 225A 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 OE MO mu NO OM MO NO NOTES: 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 225A BUS TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 30/ 2 2 20/ 2 2 VOLTAGE. REV' DATE. LOAD KVA TYPE 0.7IREC 0.7IREC 0.7IREC 0.7 IREC 1.1 ILTS 1.1 IREC 1.1IREC 1.4IREC 1.4IREC 1.1 IREC 1.1 LTS 1.0 REC 208Y/ 120V 3 ph. 225A BREAKER DESCRIPTION PHARMACY PHARMACY PHARMACY CARDIAC REHAB BASEMENT CORR BIOMED* (NOTE 3) BIOMED* (NOTE 3) BIOMED* (NOTE 3) BIOMED* (NOTE 3) BIOMED* (NOTE 3) LIFE LINE OFFICE STOR, ELEV MECH VEST (NOTE 3) SPARE (NOTE 3) SPARE (NOTE 3) SPARE SPARE CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 8.9 81% 7.2 60 B: 8.1 81% 6.6 55 C: 9.9 81% 8.0 67 NEC TOTAL! 26.91 1 21.81 60 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS I I IIDOUBLE LUGS I I SPARLING, INC I 4 wire KAIC OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE (NAME. CB3 (EXISTING) 'LOCATION: SHORT STAY TYPE 'EQUIP WARM CAB EQUIP REC REC EQUIP EQUIP IREC REC REC REC REC REC REC REC REC REC REC LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION REFRIG ENDOSCOPY NORTH STATION CRACH CART CLEAN UTILITY PATIENT ROOM SOUTH PATIENT ROOM SOUTH PATIENT ROOM SOUTH PATIENT ROOM SOUTH PEDS HOLDING PEDS HOLDING SPARE SPARE (NOTE 3) SPARE (NOTE 3) SHORT STAY CHAIR ROOM (NOTE 3) SHORT STAY CHAIR ROOM *(NOTE 3) SHORT STAY PATIENT RMS SOUTH *(NOTE 3) SHORT STAY PATIENT RMS NORTH (NOTE 3) SHORT STAY PATIENT RMS NORTH *(NOTE 3) SPACE CONN. NEC CALCULATED NEC CALC. (KVA) FACTOR LOAD (KVA) 8.9 125% 11.2 1s1. 10.0 100% 1st. 10.0 1.6 50% 0.8 100% 100% 100% 4.5 100% 100% 25.1 106% OLYMPIC MEMORIAL HOSPITAL 0 0 0 I I I ROOD 0 0 0 225A BUS LOAD TRIP TRIP KVA RATING RATING 1 1.21 20/ 1 1 2 20/ 1 0.7 20/1 3 4 20/ 1 0.7 20/ 1 5 6 20/ 1 0.7 201 1 7 8 20/ 1 0.5 20/ 1 9 10 20/ 1 0.7 20/ 1 11 12 20/ 1 0.7 20/ 1 13 1011 14 20/ 1 0.7 20/ 1 15 16 20/ 1 0.7 20/1 17 18 20/1 0.7 20/ 1 19 20 20/ 1 0.7 20/ 1 21 22 20/ 1 0.7 20/ 1 23 24 20/ 1 20/ 1 25 26 20/ 1 20/ 1 27 28 20/ 1 20/ 1 29 30 20/ 1 0.7 20/ 1 31 32 20/ 1 0.7 20/ 1 33 34 20/ 1 0.4 20/ 1 35 36 20/ 1 0.4 20/ 1 37 38 20/ 1 0.4 20/ 1 39 40 41 42 NOTES: DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 16471 APPENDIX SPARLING, INC VOLTAGE. 208W 120V 3 ph. 4 wire LOGS ONLY KAIC LOAD KVA TYPE DESCRIPTION 1.1 LTS ENDOSCOPY 1.3 LTS PATHWAY 1.5 LTS NORTH STATION/UTILITY 14 LTS NORTH PATIENT ROOMS (NOTE 1) SPARE (NOTE 1) 0.7 REC NORTH PATIENT ROOMS 0.7 REC NORTH PATIENT ROOMS 0.7 REC NORTH PATIENT ROOMS 0.7 REC NORTH PATIENT ROOMS 0.4 LTS 8 REC PENTHOUSE (NOTE 2) 1.0 EQUIP NURSE CALL CABINET 0.4 REC ISOLATED 0.4 REC ISOLATED 1.1 LTS SHORT STAY OR #7 (NOTE 2) 1.2 LTS SHORT STAY OR #7 (NOTE 2) 0.4 LTS MECHANICAL PENTHOUSE (NOTE 3) 0.5 LTS HVAC PENTHOUSE (NOTE 3) 0.4 EQUIP DDC MECH PENTHOUSE (NOTE 3) SPARE (NOTE 3) SPARE (NOTE 3) SPACE 1 CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 8.8 106% 9.3 77 8: 8.3 106% 8.7 73 C: 8.0 106% 8.5 71 NEC TOTAL.1 25.11 I 26.51 74 CIRCUIT BREAKER CODE G GFCI H HID RATED 4.5 S SHUNT TRIP 0 SWITCHING DUTY FED FROM: I 0 DOWNSTREAM LOAD INFORMATION 26.5 FEEDER LENGTH: 1 I REV' IIFEED THRU LUGS I I FEEDER: I 1 DATE. IIDOUBLE LUGS I 1 7/21/97 NW Mel OM fM 111011 MI N INK /Oil .MN M also N N No alia 111111 ill. Mt 41111 MI III* lialr 1111 ale 1111111 Or Val IWO IIIIII 111111 PANEL SCHEDULE NAME. DE1 (EXISTING) LOCATION: DELIVERY ROOMIt LOAD TYPE DESCRIPTION I KVA REC HEADWALL DEVICE 306 0.8 REC 3068 0.2 LTS 306, 3068 0.5 REC HEADWALL DEVICE 304 0.8 REC 304B 0.2 LTS 304, 3048 0.5 LTS 304, 304A, 304B, 06, 06A, 06B I 0.5 SPACE WM SPACE WM SPACE WM SPACE WM I SPACE WM SPACE WM SPACE WM SPACE WM TRIP RATING 20/ 1 20/ 1 20/ 1 20! 1 20/ 1 20/ 1 20/1 0 0 I I 0 0 t00A TRIP RATING 1 -r 2 20/ 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 LOAD CONN. NEC CALCULATED NEC CALC. I I I CONN. NEC NEC LOAD NEC TYPE (KVA) FACTOR LOAD (KVA) 1 NOTES: PHASE (KVA) FACT (KVA) AMPS LTS 1.5 125% 1.9 A: 2.5 109% 2.7 13 REC 1st. 2.0 100% 1st. 2.0 8: 1.5 109% 1.6 8 REC 5% HVAC 100% NEC TOTAL. I 41 I 4.41 21 KIT 100% CIRCUIT BREAKER CODE S. LTS 100% G GFCI H HID RATED EQUIP 100% S SHUNT TRIP D SWITCHING DUTY MISC as 100% 0. 5 'FED FROM I DOWNSTREAM LOAD INFORMATION TOTAL 4.0 109% I 4.4 FEEDER LENGTH: 1 I REV' FEED THRU LUGS I 1 FEEDER: I 1 DATE. 'DOUBLE LUGS I I VOLTAGE. 208/ 1 ph. BUS LOG ONLY LOAD KVA TYPE DESCRIPTION 0.5 MISC SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE W/H SPACE WM SPACE W/H SPACE WM SPARLING, INC 3 wire 10 KAIC OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE NAME. DE2 (EXISTING) LOCATION: DELIVERY TYPE DESCRIPTION REC 308 REC 308 REC NURSE STATION 310A REC HEADWALL STATION 309 REC 309A LTS 309, 309A REC HEADWALL STATION 301 REC 301B LTS 301, 301B REC 310 LTS 301, 01A, 01B, 07, 09, 09A, 09B SPACE WM SPACE WM SPACE WM SPACE WM LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 1.5 125% 1.9 REC 1st. 5.0 100% 1st. 5.0 REC 50% 'HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FED FROM: TOTAL 6.5 106% 6.9 FEEDER LENGTH: FEEDER: OLYMPIC MEMORIAL HOSPITAL ROOMM LOAD KVA 1.0 1.0 0.5 0.8 0.2 0.5 0.8 0.2 0.5 0.5 0.5 TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 I I 0 0 iE NOTES: NEC TOTAL.' 6.51 1 6.91 33 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY 1 II DOWNSTREAM LOAD INFORMATION I REV' FEED THRU LUGS I I I I DATE. DOUBLE LUGS 1 I 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 VOLTAGE. 208/ 1 ph. 100A BUS LOG ONLY TRIP LOAD RATING KVA TYPE DESCRIPTION SPACE WM SPACE WM SPACE WM SPACE W/H SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPACE WM SPARLING, INC 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 3.5 106% 3.7 18 B: 3.0 106% 3.2 15 7/21/97 as lpiN fins Mai Wor am gat Um NM aliv. Ma Op lois es alb INN 1111. '11111 OR; MN tilt lilt mem air am eau mit am art as so PANEL SCHEDULE NAME. L (EXISTING) LOCATION: 3 MAIN TYPE DESCRIPTION EQUIP 3RD FLOOR DAYROOM EQUIP 3RD FLOOR DAYROOM REC RMS 306, 309 EQUIP RMS 346, 248, 350 LTS BATH SHOWER 348, 350 REC LTS 309, 309B REC LTS LTS RM 346 EQUIP RM 344 EAST WALL LTS RM 344 EQUIP ICE MAKER LTS CORRIDOR LTS LABOR ROOM REC LABOR ROOM REC NORTH SIDE EQUIP COFFEE, NURSE LOUNGE REC 346 WEST WALL EQUIP HEATER NORTH SIED LTS WEST CEILING LOAD CONN. TYPE (KVA) LTS 5.1 REC 1st. 8.8 REC HVAC 0.8 KIT S. LTS EQUIP 12.6 MISC TOTAL 27.3 NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 105% NEC CALC. LOAD (KVA) 6.4 1st. 8.8 0.8 12.6 ROOM# LOAD KVA 0.81 0.81 0.81 0.81 0.51 0.11 1.31 0.8 0.8 0.4 1.5 0.1 0.4 0.8 0.8 1.5 0.8 1.0 0.5 'FED FROM: 28.6 FEEDER LENGTH: FEEDER: TRIP RATING 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 2011 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 1511 15/ 1 20/ 2 2 15/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 an OM a. OM MO MO NOTES: 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 400A BUS TRIP RATING 15/ 1 15/ 1 201 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 3 3 3 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 15/ 1 2012 2 VOLTAGE. REV' DATE. LOAD KVA TYPE 0.81EQUIP 0.51EQUIP 0.81REC 0.51LTS 1.21REC 0.81EQUIP 0.51LTS 1.01REC 0.81EQUIP 0.91LTS 0.9JEQUIP 1 0.51LT5 0.91REC 0.11REC 0.81HVAC 0.21 REC 1.61EQUIP 208Y/ 120V 3 ph. LUGS ONLY DESCRIPTION 3RD FLOOR DAYROOM AUTOCLAVE (OB) RMS 301, 304 RMS 348 LTS RM 306 WARMER RMS 344, 346, BATHROOM LTS RM 304, 3048 RM 344 NORTH SIDE EXHAUST FAN #15 3RD FLOOR LABOR LTS DOOR CONTROL LTS RMS 301, 301B, 310 SPARE HV SYSTEM TV HEATER SOUTH SIDE CONN. PHASE (KVA) A. 9.0 B: 10.0 C: 8.3 NEC TOTAL. I 27.31 NEC FACTOR 105% 105% 105% CIRCUIT BREAKER CODE G GFCI H HID RATED 5 SHUNT TRIP I) SWITCHING DUTY II DOWNSTREAM LOAD INFORMATION IIFEED THRU LUGS I I IIDOUBLE LUGS I I SPARLING, INC 1 NEC LOAD (KVA) 9.4 10.5 8.7 28.61 4wire 10 KAIC NEC AMPS 78 87 72 79 OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE NAME. LX (EXISTING) LOCATION: ELEC ROOM 80002 IYPE EQUIP LTS EQUIP LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL DESCRIPTION FA SYSTEM SURGERY SOILED ELEV* (NOTE 2) MED GAS ALARM BSMNT* (NOTE 2) MED GAS ALARM SURGERY* (NOTE 2) MED GAS ALARM SHORT STAY* (NOTE 2) MED GAS ALARM SURGERY' (NOTE 2) MED GAS ALARM 2 MAIN* (NOTE 3) SPACE SPACE CONN. (KVA) 0.2 2.6 2.8 OLYMPIC MEMORIAL HOSPITAL NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 102% NEC CALC. LOAD (KVA) 0.3 2.6 ROOM# LOAD TRIP 100A KVA RATING 1.0 0.2 FED FROM: 2.9 FEEDER LENGTH: FEEDER: 0 O 0 I 20/ 1 1 2 20/ 1 3 4 20 /1 5 6 20/ 1 7 8 20/ 1 9 10 20/ 1 11 12 20/ 1 13 14 15 16 20/ 2 17 18 2 19 20 21 22 23 24 25 26 27 ■IP 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 NOTES: DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 16471 APPENDIX 100A BUS TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 VOLTAGE. REV' DATE. 208Y/ 120V 3 ph. 100A BREAKER LOAD KVA TYPE DESCRIPTION 0.4IEQUIP FA PRINTER' 0.4 EQUIP MED GAS ALARM EMERG 0.4 EQUIP MED GAS ALARM SHORT STAY 0.4 EQUIP MED GAS ALARM RAD SPARE SPARE SPACE G GFCI S SHUNT TRIP FEED THRU LUGS DOUBLE LUGS CONN. NEC NEC LOAD PHASE (KVA) FACTOR (KVA) A: 1.8 102% 1.8 B: 0.6 102% 0.6 C: 0.4 102% 0.4 NEC TOTAL! 2.81 1 2.91 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION SPARLING, INC 4 wire KAIC NEC AMPS 15 5 3 8 7/21/97 eV MK imp ow Nur op am at OK NNE Sot apt apt pm ma am rfir es on ni re ow am IIIIN INV NI 11111 PANEL SCHEDULE NAME. LZ (EXISTING) LOCATION: TYPE EQUIP EQUIP EQUIP REC EQUIP HVAC HVAC HVAC HVAC LOAD CONN. TYPE (KVA) LTS REC 1st. 0.4 REC HVAC 5.0 KIT S. LTS EQUIP 10.0 MISC TOTAL 15.4 ELEC ROOM B0002 DESCRIPTION AUTO DOOR AUTO DOOR HVAC -1 CONTROL ELEC ROOM MED AIR DRYERS* (NOTE 2) EF -3 SURGERY ROOF* (NOTE 2) EF-4 SURGERY ROOF* (NOTE 3) EF-6 PEDS ROOF (NOTE 3) EF-8 MED GAS ROOM* (NOTE 3) NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 100% NEC CALC. LOAD (KVA) ROOM# LOAD TRIP KVA RATING 1.2 20/ 1 1.2 20/ 1 0.2 20/ 1 0.4 20/ 1 11 20/1 0.7 20/ 1 0.7 20/ 1 1.2 20/ 1 0.1 20/ 1 0 0 0 I 1 100A BUS 100A TRIP RATING 2 I 20/ 1 3 4 20/1 5 6 20/ 1 7 8 20/ 1 9 10 20/1 11 12 20/ 1 13 ON 14 2011 15 ■111 16 2011 17 18 -20/ 1 19 NO 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 NOTES: 1st. 0.4 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT 5.0 NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 10.0 FED FROM: 15.4 FEEDER LENGTH: FEEDER: VOLTAGE. REV' DATE. LOAD KVA TYPE 0.2 EQUIP 1.2 EQUIP 1.2 EQUIP 0.7 HVAC 1.2 HVAC 0.4 HVAC 1.6 EQUIP 1.6 EQUIP 0.5 EQUIP 208Y1 120V 3 ph. 100A BREAKER DESCRIPTION HVAC -2 CONTROL IIFEED THRU LUGS I IIDOUBLE LUGS I AUTO DOORS LOBBY AUTO DOORS LOBBY EF -7 ROOF EF 11 LAB EF -15 LAB AUTO DOOR SURGERY* (NOTE3) AUTO DOOR SURGERY' (NOTE3) AFTER COOLER (NOTE 3) PHASE A. B: C: NEC TOTAL. CONN. (KVA) 4.8 7.5 3.1 15.41 NEC FACTOR 100% 100% 100% SPARLING, INC NEC LOAD (KVA) 4.8 7.5 3.1 1 15.41 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY II DOWNSTREAM LOAD INFORMATION 4 wire KAIC NEC AMPS 40 62 26 43 OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/21/97 PANEL SCHEDULE NAME. MP -E2 (EXISTING) LOCATION: PENTHOUSE, PHASE IV ADDITION T DESCRIPTION HVAC EF 12 3/4 HP HVAC SF -5 71/2 HP* (NOTE 3) 9.1 HVAC EF -5 2 HP* (NOTE 3) 2.8 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 100% REC 50% HVAC 18.8 100% 18.8 KIT 100% S. LTS 100% EQUIP 100% MISC 100% TOTAL 18.8 100% OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD KVA 1.2 FED FROM: 18.8 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 3 3 3 20/ 3 3 3 15/ 3 3 3 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 OM OE MO OE OE •1 MO OE OE MO NOTES: 225A TRIP RATING 2 15/ 3 4 3 6 3 8 15/ 3 10 3 12 3 14 15/ 3 16 3 18 3 20 15/ 3 22 3 24 3 26 28 30 32 34 36 38 40 42 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT 16471 APPENDIX VOLTAGE. 480Y/ 277V 3 ph. 4 wire LOAD KVA TYPE DESCRIPTION 1.2 HVAC EF -10 3/4 HP 0.8 1.5 2.2 HVAC EF 11 1/2 HP HVAC EF -131 HP HVAC EF -141 1/2 HP LUGS ONLY KAIC NOTE 3 ADD NEW CIRCUIT BREAKER G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY I II DOWNSTREAM LOAD INFORMATION I I REV' IIFEED THRU LUGS I I I I DATE. IIDOUBLE LUGS I I SPARLING, INC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 6.3 100% 6.3 23 B: 6.3 100% 6.3 23 C: 6.3 100% 6.3 23 NEC TOTAL. I 18.81 1 18.81 23 CIRCUIT BREAKER CODE 7/21/97 ,11111. INS NW ANN Ais) 1111. OW ISE mil lor, No all MIN OM N Ili 1111, J O.; all MOO S. .UN MIN t Ill PANEL SCHEDULE NAME. MP -N2 (EXISTING) LOCATION: PENTHOUSE, PHASE IV ADDITION ROOM# LOAD TYPE DESCRIPTION KVA HVAC SF -2 20 HP I 22.4 HVAC SF 315 HP 17.5 HVAC RF-3 1 1/2 HP 2.2 HVAC RF -2 5 HP j 6.3 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 100% REC 50% HVAC 98.3 100% KIT 100% S. LTS 100% EQUIP 100% OLYMPIC MEMORIAL HOSPITAL TRIP RATING 40/ 3 3 3 30/ 3 3 3 15/ 3 3 3 15/ 3 3 3 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 OM OE MO OM OE OM MO Ni OM NOTES: 225A TRIP RATING 2 70/3 4 3 6 3 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT 98.3 NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER VOLTAGE. 480Y/ 277V 3 ph. LOAD KVA TYPE DESCRIPTION 49.9 HVAC AC -6 2MAIN AC* (NOTE 3) SPARLING, INC j LUGS ONLY KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 32.8 100% 32.8 118 B: 32.8 100% 32.8 118 C: 32.8 100% 32.8 118 NEC TOTAL. I 98.31 I 98.31 118 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY MISC 100% FED FROM: I 1 DOWNSTREAM LOAD INFORMATION TOTAL 98.3 100% I 98.3 FEEDER LENGTH: I I REV' I FEED THRU LUGS I FEEDER: I DATE. 1 DOUBLE LUGS I I I 16471 APPENDIX 7/21/97 1PANEL SCHEDULE !NAME. X (EXISTING) (LOCATION: TYPE L TS L TS L TS LTS LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL CONN. (KVA) 8.1 2.6 10.7 ELEC ROOM B0002 DESCRIPTION EXIT SIGNS MAIN FLOOR CORRIDOR, MAIN FLOOR EXIT SIGNS INFO SYSTEMS SPARE SPARE OLYMPIC MEMORIAL HOSPITAL NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 119% NEC CALC. LOAD (KVA) 10.1 2.6 ROOM# LOAD KVA 0.6 3.3 1.0 0.6 FED FROM: 12.7 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 0 0 0 2 5 6 9 10 11 12 13 W. 14 15 16 17 18 19 W. 20 21 22 23 24 25 26 27 28 29 30 31 Og 32 33 ■O 34 35 36 37 W 38 39 M. 40 41 42 NOTES: DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER 1 6471 APPENDIX VOLTAGE. 100A BUS TRIP LOAD RATING KVA TYPE 20/ 1 0.6 LTS 20/ 1 1.8 LTS 20/ 1 40/ 3 1.8 PNL 3 0.6 3 0.4 REV' DATE. 480Y/ 277V 3 ph. G GFCI S= SHUNT TRIP LUGS ONLY DESCRIPTION EXIT SIGNS BASEMENT CORRIDOR/ELEC RMS SPARE LX PHASE A. B: C: NEC TOTAL! CONN. NEC (KVA) 3.6 5.7 1.4 10.71 FACTOR 119% 119% 119% SPARLING, INC NEC LOAD (KVA) 4.3 6.8 1.7 12.71 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS I I DOUBLE LUGS I I KAIC NEC AMPS 15 24 6 15 7/21/97 11111111 1111111 III* 11111 SIII MIK 1111 art) A gni\ II. Igo imp ow or am rut o: as Mee rat. ar a.: elm i sou r PANEL SCHEDULE SPARLING, INC NAME. Y (EXISTING) LOCATION: ELEC ROOM 620 ROOM# LOAD TRIP TYPE DESCRIPTION KVA RATING PNL G (NOTE 3) PNL 1Y1 SPARE 12.2 9.2 9.2 90 9.2 6.9 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 21.2 125% 26.4 REC 1st. 10.0 100% 151. 10.0 REC 27.5 50% 13.8 HVAC 0.8 100% 0.8 KIT 100% S. LTS 100% EQUIP 23.5 100% 23.5 MISC 15.2 100% 15.2 FED FROM: TOTAL 98.1 91% 89.6 FEEDER LENGTH: FEEDER: 0 0 0 I 400A BUS TRIP RATING 100/ 3 1 2 100/ 3 3 3 4 3 3 5 6 3 100/ 3 7 8 225/ 3 3 9 10 3 3 11 12 3 100/ 3 13 IP. 14 3 15 16 3 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 NOTES: DENOTES CHANGE IN CIRCUIT NOTE 1 MODIFY EXISTING CIRCUIT NOTE 2 ADD LOAD TO EXISTING SPARE CIRCUIT NOTE 3 ADD NEW CIRCUIT BREAKER I VOLTAGE. 208Y1 120V 3 ph. LUGS ONLY LOAD KVA TYPE DESCRIPTION 9.0 10.0 8.3 15.2 15.2 15.2 CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A. 35.2 91% 32.2 268 B: 33.4 91% 30.5 254 C: 29.5 91% 26.9 224 NEC TOTAL. I 98.11 1 89.61 249 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV* IIFEED THRU LUGS DATE. IIDOUBLE LUGS PNL L (NOTE 1 3) MISC H& 3Y1 4 wire KAIC OLYMPIC MEMORIAL HOSPITAL 16471 APPENDIX 7/41/97 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS c PANELBOARDS APPENDIX 3 EXISTING PANELBOARDS TO BE DEMOLISHED FOR REFERENCE ONLY SECTION 16471 PAGE 6 PANELBOARDS END OF SECTION 16471 1 1111111` ON N II 111111 NI I all 11111111 NB 1 11111 111111 I III all PANEL SCHEDULE NAME. CB1 (SECT 1) OLYMPIC MEMORIAL HOSPITAL EXISTING LOCATION: 2 MAIN PEDIATRICS TYPE DESCRIPTION REC RM 254 REC RM 254 REC RM 255 REC RM 256 REC RM 257 REC RM 257 REC RMS 254, 255 REC RMS 254, 255 REC CRASH CART CORR 250B IREC RM 258 IREC CRASH CART CORR 252 IREC NURSES STATION 252 REC NURSES STATION 252 REC NURSES STATION 252 REC NURSES STATION 259 REC NURSES STATION 259 REC NURSES STATION 259 IREC NURSES STATION 259 IREC NURSES STATION 259 IREC REFRIG 262 (EQUIP FILM ILLUM 262 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 4.2 125% 5.3 REC 1s1. 10.0 100% 1st. 10.0 REC 3.0 50% 1.5 HVAC 100% KIT 100% S. LTS 100% EQUIP 3.9 100% MISC 11.8 100% TOTAL 32.9 99% LOAD KVA 3.9 11.8 FED FROM: 32.5 FEEDER LENGTH: FEEDER: ROOM# 0 0 0 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 1.0 0.7 TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 On MO OM OE I■ WI ■I MO MO NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 16471 APPENDIX 100A BUS TRIP RATING 2 20/ 1 4 20/ 1 6 20/ 1 8 20/ 1 10 20/ 1 12 20/ 1 14 20/ 1 16 20/ 1 18 20/1 20 20/ 1 22 20/ 1 24 20/ 1 26 20/ 1 28 20/ 1 30 20/ 1 32 20/ 1 34 20/ 1 36 20/1 38 40 42 VOLTAGE. 208W 120V 3 ph. 4 wire 100A 3P MAIN LUGS ONLY 10 KAIC LOAD KVA TYPE DESCRIPTION 1.OIREC REFRIG 259 1.0IREC REFRIG 260 0.7IEQUIP ICE MAKER 260 0.1 ILTS RMS 254, 255, 256, 257 0.5ILTS 250 A,B,C 0.6ILTS RMS 252, 258, 259 1.0ILTS EXIT CORRIDOR 1.0ILTS RMS 248, 252 1.0 LTS RMS 254, 256 SPARE 0.5 EQUIP NURSE CALL SYSTEM 0.5 EQUIP NURSE CALL SYSTEM 0.5 EQUIP NURSE CALL SYSTEM 0.5 EQUIP NURSE CALL SYSTEM 0.5 EQUIP NURSE CALL SYSTEM SPARE SPARE 0.4 REC RMS 262, 266 SPACE SPACE SPACE_ G GFCI S SHUNT TRIP CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 10.0 99% 9.8 82 B: 14.3 99% 14.1 117 C: 8.7 99% 8.6 72 NEC TOTAL! 32.91 1 32.51 90 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY I DOWNSTREAM LOAD INFORMATION I REV' FEED THRU LUGS I X (CBI (SECT 2) I DATE. DOUBLE LUGS I I SPARLING, INC (14.7kva) 7/21/97 PANEL SCHEDULE NAME. CB1 (SECT2) LOCATION: 2 MAIN PEDIATRICS 1YPE DESCRIPTION LTS NURSES STATION 2 EAST LTS NURSES STATION 2 EAST REC RM 2061 EQUIP NURSE CALL CAB 3 EAST SPARE SPARE REC NURSES STATION 3 WEST REC NURSES STATION 3 WEST LTS RMS 346, 348, 350, 3 WEST LTS RMS 313, 315, 317, 319, 3 EAST LTS RMS 305, 307, 309, 311, 3 EAST LTS RMS 340, 342, 344, 3 WEST LTS OB UTILITY LTS DELIVERY LTS DELIVERY LTS DELIVERY LTS DELIVERY SPACE SPACE SPACE SPACE LOAD CONN. TYPE (KVA) LTS REC 1st. 2.9 REC HVAC KIT S. LTS EQUIP MISC 11.8 TOTAL 14.7 OLYMPIC MEMORIAL HOSPITAL NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% 100% EXISTING NEC CALC. LOAD (KVA) LOAD KVA ROOM# TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77 79 81 83 0 0 0 mu RI S. NIP U. S- NOTES: 1st. 2.9 EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 11.8 FED FROM: 14.7 FEEDER LENGTH: FEEDER: 16471 APPENDIX 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 100A BUS TRIP RATING 20/ 1 20/ 1 20! 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 70/ 2 2 70/ 2 2 VOLTAGE. LOAD KVA 1.1 1.8 4.2 7.6 TYPE LTS LTS LTS REC REC ITS LTS REC LTS LTS REC REC REC MISC 208Y/ 120V 3 ph. 100A 3P MAIN LUGS ONLY MISC DE2 SPACE SPACE SPACE SPACE I PHASE A. 8: C: NEC TOTAL! DESCRIPTION RMS 301, 303, 329, 331, 3 EAST RMS 321, 327, 329, 331, 3 EAST RMS 270, 271, 274, 273, 274 NURSERY NURSERY WORK RM NURSERY NURSERY NURSES STATION 3 EAST NURSES STATION 3 EAST NURSES STATION 3 EAST NURSERY NURSERY WORK RM NURSERY WORK RM DE1 CONN. NEC NEC LOAD (KVA) FACTOR (KVA) 4.9 100% 7.7 100% 2.1 100% 14.71 I SPARLING, INC 4.9 7.7 2.1 14.71 4 wire 10 KAIC NEC AMPS 41 64 17 41 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY II DOWNSTREAM LOAD INFORMATION REV' FEED THRU LUGS I I I DATE. IIDOUBLE LUGS I I 7/21/97 161 11111 IMO 111111 Sill MR ON INN M MO MO MI Olt MIN 11111 MN WS NIB MN all OS MN Mt NIS INK 11.1111 111.1 PANEL SCHEDULE NAME. CB2 (SECT 1) LOCATION: 1TYPE ALTS LTS LTS LTS LTS LTS LTS LTS LTS 'LTS LTS EQUIP LTS LTS LTS LTS LTS LTS LTS LTS LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL SURGERY HSKP CLOSET DESCRIPTION OR #1 OR #1 OR #2 OR #2 OR #3 OR #3 OR #4 OR #4 OR #5 OR #5 XRAY RM 112 02 ALARM SPARE 1st FLOOR EAST 1st FLOOR WEST SURG ANESTH, STORE, WORK RECOVERY RECOVERY STER STORE EMER #1 EMER #2 CONN. NEC CALCULATED (KVA) FACTOR 24.4 125% 1st. 10.0 100% 5.3 50% 100% 100% 100% 22.7 100% 100% 62.4 105% OLYMPIC MEMORIAL HOSPITAL EXISTING NEC CALC. LOAD (KVA) 30.5 1st. 10.0 2.7 22.7 FED FROM: 65.8 FEEDER LENGTH: FEEDER: ROOM# LOAD TRIP KVA RATING 1.2 20/ 1 1.2 20/ 1 2 0.5 2011 3 1.2 20/1 4 1.2 20/ 1 5 0.5 20/ 1 6 1.2 20/ 1 7 1.2 20/ 1 8 0.5 20/ 1 9 1.2 20/ 1 10 20/ 1 11 20/1 12 20/ 1 13 20/1 A 4 20/1 15 1.2 20/ 1 16 1.0 20/ 1 17 1.2 20/ 1 18 1.2 20/ 1 19 0.9 20/ 1 20 1.1 20/ 1 21 0 0 0 NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 1 647 1 APPENDIX VOLTAGE. 208Y/ 120V 3 ph. LUGS ONLY SPARLING, INC 4 wire J KAIC TRIP LOAD RATING KVA TYPE DESCRIPTION 22 20/ 1 1.2ILTS CORRIDOR 23 20/ 1 1.OILTS CORRIDOR 24 20/ 1 14ILTS CORRIDOR 25 20/ 1 1 4ILTS CORRIDOR 26 20/ 1 I SPARE? 27 20/ 1 0.7ILTS BASEMENT 28 20! 1 0.5IREC 29 20! 1 0.5IREC 30 20/ 1 0.7IREC 31 20/ 1 0.7IREC 32 20/ 1 0.5IREC 33 20! 1 0.7IREC 34 20/ 1 0.5IREC 35 20! 1 0.5IREC 36 20/ 1 0.5IREC 37 20/ 1 0.7IREC 38 20/ 1 0.7IREC 39 20! 1 0.5IREC 40 20/ 1 0.7IREC 41 20/ 1 0.7IREC 42 20/ 1 0.7IREC I CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 25.6 105% 27.0 225 B: 19.5 105% 20.5 171 C: 17.3 105% 18.3 152 NEC TOTAL. I 62.41 I 65.81 183 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV FEED THRU LUGS I X ICB2 (SECT 2) DATE DOUBLE LUGS I I (30.7kva) 7/2 1/97 PANEL SCHEDULE NAME. CB2 (SECT2) 'LOCATION: SURGERY HSKP CLOSET OLYMPIC MEMORIAL HOSPITAL EXISTING I YPE DESCRIPTION REC REC REC REC REC REC LTS BASEMENT PHARMACY LTS BASEMENT PHARMACY SPARE LTS TEL ROOM BASEMENT REC TEL ROOM BASEMENT SPARE? REC PHARMACY BASEMENT REC PHARMACY BASEMENT EQUIP NUSRE CALL CABINET REC REFRIG LAB REC REFRIG LAB EQUIP X -RAY SURGERY #3 REC COMPUTER ADMIN LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 2.2 125% 2.8 REC 1st. 5.8 100% 1st. 5.8 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 22.7 100% 22.7 MISC 100% TOTAL 30.7 102% LOAD KVA 0.7 0.7 0.7 0.5 0.4 0.5 1.2 0.8 ROOM# 0.2 0.4 0.7 0.7 0.2 0.2 0.2 FED FROM: 31.3 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 43 20/ 1 44 20/ 1 45 20/ 1 46 20/ 1 47 20/ 1 48 20/ 1 49 20/ 1 50 20/ 1 51 2011 52 20/ 1 53 20/ 1 54 20/ 1 55 20/ 1 56 20/ 1 57 20/ 1 58 20/ 1 59 60/ 2 60 2 61 20/ 1 62 63 0 0 0 NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 16471 APPENDIX TRIP RATING 64 3012 65 2 66 30/ 2 67 2 68 30/ 2 69 2 70 30/ 2 71 2. 72 30/ 2 73 2 74 20/ 1 75 20/ 1 76 20/ 1 77 20/ 1 78 20/ 1 79 20/ 1 80 20/ 1 81 82 83 84 VOLTAGE. 208Y/ 120V 3 ph. LUGS ONLY LOAD KVA TYPE 4.5IEQUIP OR #1 4.5IEQUIP OR 4.5IEQUIP OR 4.5 4.5 EQUIP OR#4 EQUIP OR #5 EQUIP SONIC CLEANER LTS 2E EAST END SOUTH SIDE EQUIP STERIZER STORAGE ROOM G GFCI S SHUNT TRIP I REV' FEED THRU LUGS I DATE. I1DOUBLE LUGS DESCRIPTION SPARLING, INC 4 wire KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACTOR (KVA) AMPS A: 12.6 102% 12.8 107 B: 9.9 102% 10.1 84 C: 8.2 102% 8.4 70 NEC TOTAL! 30.71 I 31.31 87 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION 7/21/97 NIP an MI O NIB NM in MN Willi alla Mil MO MI MB ON III* 111111 NIS M s OR M .MO Iis I r Ms MI I e PANEL SCHEDULE NAME. CC EXISTING LOCATION: SURGERY SUPPORT TYPE DESCRIPTION REC REC REC REC REC REC REC LOCKERS/LOUNGE EQUIP U/C REFRIG REC LOCKERS/LOUNGE LTS EXTERIOR REC REC DRESS RM/LNG SPARE REC GARBAGE DISP RM 1602 SPARE LOAD TYPE LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL CONN. (KVA) 1.4 1st. 10.0 12.4 NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 7.8 100% 100% 31.6 81% OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) 1.8 1st. 10.0 6.2 7.8 ROOM# LOAD KVA 11 1.1 1.1 1.1 1.1 11 1.3 1.4 1.3 1.4 1.1 1.1 1.5 FED FROM: 25.8 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 I I I 0 0 0 mu On NI MO urn OM OM MO OM OM NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 100A BUS TRIP RATING 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 VOLTAGE. REV' DATE. LOAD KVA 1.1 1.1 1.1 0.6 0.9 0.9 1.4 1.1 14 1.1 11 1.2 1.1 0.6 1.2 TYPE REC REC REC EQUIP REC REC EQUIP REC EQUIP REC REC EQUIP REC EQUIP EQUIP 208Y/ 120V REFRIG PATH OFF/LOCKER PATH OFF UC REFRIG/CRYOSTAT AUTOCLAVE LOUNGE OR D UTILITY LOUNGE/CONF REFRIG LOUNGE MICROWAVE LOUNGE PHASE A. B: C: NEC TOTAL. I 3 ph. LOGS ONLY DESCRIPTION CONN: (KVA) 10.2 11.0 10.4 31.61 NEC FACTOR 81% 81% 81% NEC LOAD (KVA) 8.3 9.0 8.5 1 25.81 CIRCUIT BREAKER CODE G GFCI H HID RATED 5 SHUNT TRIP D SWITCHING DUTY II DOWNSTREAM LOAD INFORMATION FEED THRU LUGS I I DOUBLE LUGS I SPARLING, INC KAIC NEC AMPS 69 75 71 71 7/21/97 PANEL SCHEDULE NAME. J EXISTING LOCATION: 2 MAIN (PEDIATRICS) 1 YPE DESCRIPTION REC RMS 258, 262 REC RMS 258, 262 SPARE REC RM 263 REC RM 263 SPARE REC RM 260 REC LTS RMS 259, 260 REC LTS RM 260 ,REC RM 250B, 253 REC RMS 252, 253 REC RM 252 LTS RMS 250C, 252, 250B LTS RMS 250B, 250C, 252, 260 LTS RMS 254T, 253 LTS RMS 256T, 255T, 255, 254 LTS RMS 256, 257 SPARE EQUIP DUCT HEATER RMS 250A, 260, 262 LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR LTS 125% REC 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% TOTAL OLYMPIC MEMORIAL HOSPITAL NEC CALC. LOAD (KVA) LOAD KVA ROOMW FED FROM: FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 20/1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 30/ 3 3 3 3 5 7 9 11 13 15 17 19 21 23 25 27 29_ 31 33 35 37 39 41 0 0 0 VOLTAGE. 0 0 01 I I I MB IP■ MO U. MN MO NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 16471 APPENDIX 4 6 8 10' 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 225A BUS TRIP RATING 20/ 1 20/ 1 2011 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20! 1 20/ 1 20/ 1 20/ 1 20/ 1 40/2 2 REV' DATE. LOAD KVA 208W 120V 3 ph. LOGS ONLY TYPE DESCRIPTION REC PSM RM 254 REC PSM RM 254 REC PSM RM 255 REC PSM RM 256 REC PSM RM 257 REC PSM RM 257 REC RM 254 REC RM 254, 255 REC RM 255 REC RM 256 REC RM 257, 256B, 256V REC RM 257 REC RM 260 REC RM 259 SPARE SPARE SPARE SPARE SPARE EQUIP MECH EQUIP RM 263 CONN. NEC NEC LOAD PHASE (KVA) FACTOR (KVA) A: B: C: NEC TOTAL. I I I CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS I I DOUBLE LUGS I I SPARLING, INC 4 wire KAIC NEC AMPS 7/21/97 1 i e. I M a— r i N Me I all all Mill MP i r OS an al 1 NO am an se I— r OM ON Mt r 1 I PANEL SCHEDULE NAME. K LOCATION: TYPE LTS LTS REC LTS LTS LTS LTS LTS LTS LOAD CONN. TYPE (KVA) LTS REC REC HVAC KIT S. LTS EQUIP MISC TOTAL CLEAN UTILITY DESCRIPTION REC PATIENT ROOMS REC PATIENT ROOMS NURSING SUPR. OFFICE REC REC REC REC REC REC REC ROOM 264 EXAM OLYMPIC MEMORIAL HOSPITAL NEC CALCULATED FACTOR 125% 100% 50% 100% 100% 100% 100% 100% EXISTING NEC CALC. LOAD (KVA) LOAD KVA ROOM# FED FROM: FEEDER LENGTH: FEEDER: TRIP RATING 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 201 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 0 0 0 OM OE OM MO NO MO OE EN ■I En OM IN NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 16471 APPENDIX 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 225A BUS TRIP RATING 20/ 1 201 1 20/ 1 2011 20/ 1 2011 20/1 20/ 1 20/ 1 20/ 1 20/ 1 20/1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 20/ 1 VOLTAGE. REV' DATE. LOAD KVA TYPE LTS LTS LTS LTS REC LTS LTS REC REC REC REC REC REC LTS LTS LTS 208Y/ 120V 3 ph. G GFCI 3= SHUNT TRIP LUGS ONLY DESCRIPTION REC PATIENT ROOMS REC PATIENT ROOMS REC PATIENT ROOMS REC PATIENT ROOMS SOUTH SIDE HALLWAY REC HALLWAY RMS 260 262 RMS 254, 256, 258, TUB RM 252 RM 244 RMS 246, 248 RMS 260, 62, 64, 66, BED RMS 244, 246, 248, BED RMS 252, 254, 256, 258, BED CONN. NEC PHASE (KVA) FACTOR A: B: C. NEC TOTAL. CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION FEED THRU LUGS I DOUBLE LUGS I i SPARLING, INC 4 wire NEC LOAD NEC (INA) AMPS KAIC 7/21/97 1 1 1 f 1 i 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURERY ADDITIONS ALTERATIONS PART 1 GENERAL 1 1 SUMMARY A Provide lighting system complete and fully operational. B Substitutions: Bidders requesting approval to provide products other than those specifically listed in the fixture schedule shall submit requests in writing to the Architect and Lighting Designer ten days prior to the close of the bid period. Approval will be in the form of an addendum to the specifications issued to all registered plan holders. No requests for substitution will be considered after this date. 2 Substitution request shall include all information required under paragraph 14 SUBMITTALS. Requests for approval shall be accompanied by a working fixture sample (including lamp(s) and a cord and plug). Provide the name of at least one installation where each proposed substitute has been installed for at least six months along with the name and phone number of the Architect, Owners representative and the Lighting Designer of Record. If required by the Lighting Designer, the proposed substitutes must be installed at the bidders expense in a location selected by the Architect. 1 2 REFERENCES A National Electrical Manufacturer's Association (NEMA) 1 LE5 -1993 B Underwriters Laboratories, Inc. (UL) 1 UL 496 Procedure for determining Luminaire efficiencyratings. SECTION 16500 PAGE 1 LIGHTING Edison Base Lampholders 2 UL 542 Lampholders, Starter Holders for Fluorescent Lamps 3 UL 676 Underwater Lighting Fixtures 4 UL 924 Emergency Lighting and Power Equipment 5 UL 935 Fluorescent Lamp Ballasts 6 UL 1029 HID Lamp Ballasts 7 UL 1570 Fluorescent Lighting Fixtures 8 UL 1571 Incandescent Lighting Fixtures 9 UL 1572 High Intensity Discharge Lighting Fixtures 10 UL 1574 Track Lighting Systems MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURERY ADDITIONS ALTERATIONS 1 3 SYSTEM DESCRIPTION A Light fixture schedule series numbers are a design series reference and do not necessarily represent the exact catalog number size, voltage, wattage, type of lamp, ballast, finish trim, ceiling type, mounting hardware, ceiling trim or special requirements as specified hereinafter or as required by the particular installation(s). Provide complete fixtures to correspond with the number of lamps, wattage and/or size specified. B Light fixture voltage shall match voltage of circuit serving the light fixture. 1 4 SUBMITTALS A For standard catalog items provide original product sheets, neatly and clearly marked to indicate light fixture, ballasts and lamps fully comply with contract documents. Include photometric report by an independent certified testing laboratory when required in fixture schedule. Manufacturer's test report is not acceptable. B Submittals shall have fixture types and project name clearly indicated and shall be prepared by the authorized manufacturer's representative serving the project area. A list of manufacturer's representatives (including address, telephone and fax numbers) identifying which light fixture types they represent shall be included with submittals. Submittals or requests for prior approvals not meeting these requirements will be rejected. 1 5 QUALITY ASSURANCE A All fixtures and components shall be new and listed by Underwriters Laboratories (UL) or other testing lab acceptable to local jurisdiction. 1 6 WARRANTY 1 7 EXTRA MATERIALS SECTION 16500 PAGE 2, LIGHTING A Ballasts: Provide manufacturer's warranty for a period of not less than five years. Warranty shall include parts and labor to replace defective ballasts. B Exit Signs Utilizing LED Lamp Technology Provide manufacturer's warranty for a period of not less than 5 years including parts and labor for full replacement of defective product. A Ballasts: Provide one case or 10% (whichever is less) of each type used on the project. Turn over to Owner and obtain signed receipt. B Lamps: Provide one case or 10% (whichever is less) of each type used on the project. Turn over to Owner and obtain signed receipt. C Fuses: Provide one case or 10% (whichever is less) of each type used on the project. Turn over to Owner and obtain signed receipt. i 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURERY ADDITIONS ALTERATIONS SECTION 16500 PAGE 3 LIGHTING PART 2 PRODUCTS 2 1 GENERAL MATERIAL REQUIREMENTS A Interior Light Fixtures: Finish ferrous mounting hardware and accessories to prevent corrosion and discoloratibn to adjacent materials. s For weatherproof or vaportight installations, painted finishes of fixtures and accessories shall be weather resistant enamel using proper primers or galvanized and bonderized epoxy so that the entire assembly is completely corrosion resistant for the service intended. Where aluminum parts come into contact with bronze or steel parts, apply a coating material to both surfaces to prevent corrosion. C Fixtures shall be free of light leaks and designed to provide sufficient ventilation of lamps to provide the photometric performance required. Ballasts and transformers shall be adequately vented. n All sheet metal work shall be free from tool marks and dents and shall have accurate angles bent as sharp as compatible with the gauges of the required metal. Intersections and joints shall be formed true and of adequate strength and structural rigidity to prevent any distortion after assembly Finish exposed edges so no sharp or ragged edges are exposed. All miters shall be in accurate alignment with abutting intersecting members. E Lampholders shall hold lamps securely against normal vibrations and maintenance handling. F Reflector Cones: 1 Provide minimum 45° lamp and lamp image cut -off for all vertically mounted lamps. For horizontal lamps provide minimum 33° cut -off. 2 Plastic materials shall not be used for reflector cones, unless noted otherwise in the Light Fixture Schedule. 3 Reflector cones shall not be riveted or welded to housing and shall be removable without tools. Retention devices shall not deform the cone in any manner Trim shall be flush with finished ceiling without gaps or light leaks. Where the flange trim is separate from the cone, it shall have the same finish as the cone. 4 Reflector cones shall be of uniform gauge, not less than 0 032' thick, high purity aluminum Alcoa 3002 alloy free of spin marks or other defects. 5 Manufacture reflector under the Alzak process. Refer to fixture schedule for cone color and specular or diffuse finish requirements. For fixtures using compact fluorescent lamps, provide additional finish equivalent to Color -Chek that eliminates iridescence. Submit one sample of each cone type for review when required in the fixture schedule. G Light fixtures containing lamps which require protective shielding shall have tempered glass lens. x Fixtures recessed in suspended ceilings where the space above the ceiling is either an air supply or return plenum shall conform with NEC Article 300 -22. Safety Provide safety devices for removable fixture elements (cones, reflectors, lenses, etc.) to support removable elements when not in normal operating position. Safety devices shall be detachable if necessary and shall not interfere with fixture performance, maintenance or the seating of any fixture element, and not be visible during normal fixture operation. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURERY ADDITIONS ALTERATIONS ,7 Exterior Fixtures SECTION 16500 PAGE 4 LIGHTING 1 Painted surfaces shall have an outdoor life expectancy of not less than 20 years without any visible rust or corrosion. 2 All diffusing materials shall be UV stabilized. 3 Finish color(s) shall be as specified. 2 2 FLUORESCENT FIXTURES A Housing: Minimum code gauge steel or rigid aluminum construction. B Reflector Minimum 88% reflectance. C Light shields: 1 Flat Translucent Diffusers: Shall be 100% virgin acrylic and have matte finish on exterior side (facing away from lamps). Diffuser shall be of thickness specified and shall be of sufficient density to completely obscure lamp image. D Frames: Supply with concealed hinges and latching. Provide mitered corners with no gaps or light leaks. E Lamp Mounting: 1 Mount lamps used in rapid start circuits 430 ma and below within 1/2' of grounded metal as long as the lamp. For 800 and 1500ma lamps, mount within 1 of grounded metal as long as the lamp. 2 For rapid start circuits using single lamp ballasts, provide one grounding lamp holder per lamp. 2 3 HIGH INTENSITY DISCHARGE (HID) FIXTURES. A Housing: Minimum code gauge steel, bonderized or equal rust protected or rigid aluminum construction. B Finish. Visible surfaces Powder coated paint unless otherwise specified. Color and finish as selected by architect. Concealed parts, lamp holders, yokes, brackets, etc.) matte black. C Lamp Holder Housing: cast aluminum with integral heat radiating fins to assure cool lamp base operation. 2 4 WIRING A All wiring shall be as required by code for fixture wiring. B All flexible cord wiring between fixture components or to electrical receptacle and not in wireways shall have a minimum temperature rating of 105 °C. C Cords shall be fitted with proper strain reliefs and watertight entries where required by application. D No internal wiring shall be visible at normal viewing angles, i.e. above 45° from vertical. E Master Slave fixtures: supply ballasts in adjacent fixtures to operate one or more lamps in the adjacent fixture where required in drawings or fixture schedule. For single lamp fixtures, provide a two lamp ballast for two adjacent fixtures. For three lamp fixtures, provide one, two lamp ballast for the outboard 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURERY ADDITIONS ALTERATIONS lamps in each fixture and an additional two lamp ballast for the center lamp in each of two adjacent fixtures. F Tandem Wired fixtures: For fixtures in continuous rows and where required in drawings or fixture schedule, supply ballasts and wiring to control all top or inboard lamps together and control all bottom or outboard lamps together G Provide #14 AWG, 3 -wire flexible conduit connections (whips) for dual level switching as shown on drawings for light fixtures recessed in accessible suspended ceilings. Provide 3 wire whips for all dual level switching. Wire count on wire whips is not shown on drawings and shall be the responsibility of the contractor to provide proper wire count for the lighting control as shown on drawings. 2 5 BALLASTS: A Fluorescent General Requirements: 4 A sound rating for 430 ma. and 265 ma. `B' sound rating for 800 ma. `C' sound rating for 1500 ma. SECTION 16500 PAGE 5 LIGHTING 1 All lamps shall be operated on the type of circuit the lamp was designed for (preheat, rapid start, instant start, etc.). T8 lamps shall be operated on rapid start ballasts only Ballasts shall provide normal rated lamp life as stated by lamp manufacturers. 2 Ballasts shall be HPF (greater than 90 UL listed, and ETL certified. Magnetic ballasts shall be CBM certified. For projects applying for utility funding, ballasts shall meet utility requirements. Provide ballasts with thermal protection unless otherwise specified. Ballasts shall be Class P 3 Confirm voltage requirements with electrical drawings. Ballasts shall operate lamps correctly within 10% voltage variation without damaging ballasts. 5 Low temperature and/or outdoor application. Provide ballasts suitable for low starting temperature where light fixture is located outdoors, in freezer or refrigerator or other location where ambient air temperature will be below 50 degrees F 6 Dimming ballasts: Type required by dimmer manufacturer for proper operation and to maintain U.L. listing of dimming system components utilized. Total harmonic distortion shall not exceed 20% at any point within the dimming range. B Electronic Fluorescent Ballasts In addition to the general requirements, provide electronic ballasts where required in the fixture schedule as follows 1 Ballasts in conformance with the following regulatory requirements: EMI and RFI limits set by the FCC (CFR47 part 18 and FCC Part 18,15j) IEEE publication 587 category A (transients) Minimum efficiency standards of Public Law No. 100 -357 Starting sequence consistent with ANSI standard C82. 1 1993 2 Reduced light output ballasts (ballast factors below 89 are not acceptable except as noted otherwise in the light fixture schedule. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURERY ADDITIONS ALTERATIONS SECTION 16500 PAGE 6 LIGHTING 3 Total harmonic distortion shall be less than 15% of the input current. Current crest factor shall be less than 17 Operating frequency shall be between 25 and 60 kHz with no visible flicker 4 Ballasts shall operate in ambient temperatures up to 105 °F (40 °C) 5 Rapid Start ballasts shall be wired in series (or in parallel if manufactured accordingly). 6 Acceptable manufacturers: Lutron Hi -Lume, EBT Magnatek, MTI, Motorola (G.E.) Valmont. C High Intensity Discharge 1 HPF type (minimum power factor 90 2 Sound Rating: low noise' or `extra quiet' 3 Each ballast shall be individually protected by an in -line fuse in a Bussman fuseholder type HLR for 120 and 277 volt, type HEX for 208, 240 and 480 volt. 4 Metal Halide: Constant Wattage Autotransformer (CWA) except for lamps below 175 watts without ignitors where high resistance auto transformer type will be acceptable. Use Advance Transformer `Smart Cap' ballast where required by lamp selection. Electronic ballasts are acceptable where available. 5 High Pressure Sodium. Magnetic regulator or constant wattage ballast. Electronic ballasts where required by lamp selection. 6 Acceptable manufacturers: Valmont, Osram Sylvania, Holophane, Jefferson, Advance, Universal. 2 6 LAMPS A Each lamp type in the project shalt be manufactured by the same manufacturer B Fluorescent: Medium Bi -pin, T -8 rapid start, T12, Compact TT and DTT 3500K color temperature and 80+ Color Rendering Index (CRI) unless otherwise noted. Acceptable manufacturers: General Electric, Philips, Osram Sylvania or as noted in the fixture schedule. C Incandescent: 1 General service lamps Inside frosted, 120V filament lamps with a minimum 1000 hours rated life. 2 Lamps with diodes are not acceptable. 3 At time of installation, provide HIR technology lamps (by GE) for standard voltage PAR lamps and double ended tungsten halogen lamps, unless HIR technology is not available for specified lamps. 4 For low voltage lamps with dichroic reflectors, use Constant Color type (by GE) or aluminum back finishes. Coating on back of lamp shall be sufficiently dense and even to prevent light and heat from escaping out the back side of the reflector. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURERY ADDITIONS ALTERATIONS SECTION 16500 PAGE 7 LIGHTING 5 Acceptable manufacturers: General Electric (GE), Philips, Osram Sylvania or as noted in the fixture schedule. D High Intensity Discharge Type 1 For exterior applications provide clear metal halide or high pressure sodium unless specified otherwise. 2 Refer to fixture schedule for specific metal halide and high pressure sodium lamps required. Mercury Vapor shall not be used. 3 Acceptable manufacturers: General. Electric, Osram Sylvania, Philips, Venture or as noted in the fixture schedule. 2 7 SOCKETS A Incandescent Porcelain for medium or mogul screw base. For other lamp types, as required by base type. s Fluorescent Suitable for lamp and ballast type employed. C H.I.D Porcelain for mogul or medium base lamps, pulse rated as required. Keyed for all position oriented lamps. For other lamp types, as required by base type. PART 3 EXECUTION 3 1 LIGHTING FIXTURES, GENERAL A Provide mounting accessories and trims as required for wall and ceiling construction types shown in finish schedule and on drawings. B Verify weight and mounting method of all fixtures and provide supports in accordance with Section 16190 Fixture mounting assemblies shall comply with all local seismic codes and regulations. C Refer to architectural reflected ceiling plans for coordination of lighting fixture locations with mechanical and fire safety equipment. Where conflicts occur coordinate with Architect prior to installing any of the systems. n Install fixtures with vent holes free of air blocking obstacles. E Lighting fixtures located in recessed ceilings with a fire resistive rating of one hour or more shall be enclosed in an approved fire resistive rated box equal to that of the ceiling. F Contractor shall be responsible for adjusting aperture rings on all recessed fixtures to be flush with the finished ceiling. For fluorescent lamps operated on dimming ballasts, operate lamps at full output for 100 hours (continuous burn) before dimming. H Blemished, damaged or unsatisfactory fixtures or accessories shall be replaced. I For pendant mounted fixtures, mounting height is from finished ceiling to top of pendant light fixture. For wall mounted fixtures, center on outlet box unless otherwise noted. Verify mounting provisions and other requirements prior to order of light fixtures and provide as required. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURERY ADDITIONS ALTERATIONS SECTION 16500 PAGE 8 LIGHTING J In accessible suspended ceilings, provide 72' flexible conduit wiring connection (flexible tubing not permitted) from a rigidly supported junction box. K All finishes shall be unmarred upon project completion. All damaged finishes repaired or replaced. L Replace all burned out or inoperative lamps at the end of the construction prior to owner occupancy 3 2 DIFFUSERS AND ENCLOSURES Remove protective plastic covers from lighting fixture diffusers only after construction work, painting and clean up are completed. Remove all dirty lamps, reflectors and diffusers; clean and reinstall. When cleaning Alzak' reflectors, use a manufacturer recommended cleaning solution. Reflectors damaged or impregnated with fingerprints shall be replaced at the contractor's expense. END OF SECTION 16500 1 1 MAHLUM NORDFORMS MCKINLEYGORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS TYPE DESCRIPTION Al CF1 CF2 CF3 CF4 Recessed darkroom safelight shall have three compartment. One with specification grade safelight filters and two.with prismatic glass lens fully gasketed. Stainless steel frame with a continuous piano hinge. All incandescent sockets shall be porcelain. Provide Kovak safelight filters as required by users. Contractor shall coordinate ceiling system for installation of fixture. Manufacturer Alkco 2058 Series; Vista 1000R Series; NuArt DRL Series Lamps: One 15A15, Two 200A23/W Watts: 415 A2 Surface mounted wall sconce. One quarter sphere, 14 diameter opal glass. Fixture to match existing patient room fixtures except provide compact fluorescent lamp rather than incandescent lamp. Manufacturer Staff 82 29 Series Lamps: One F13TT Watts. 13 Recessed compact fluorescent downlight, horizontal lamp, nominal 8' aperture. Provide a clear Alzak parabolic cone with self flange overlap trim, and low- iridescent finish with clear acrylic lamp guard. Electronic ballast. Fixture shall have no lamp flashing in the cone. Minimum recess depth 6' Maximum recess depth 9' Manufacturer Edison Price Duplux/8 Series; Staff Value Quad 710 -85 Series; Lithonia Gotham AF218 Series; Kurt Versen P648 Series; Lightolier 8056 Series; Prescolite CFR818 Series Lamps: Two F18DTT (4 pin) Watts: 38 Recessed compact fluorescent lensed shower light, nominal 6' aperture. Constructed of acrylic enameled aluminum. Provide a clear Alzak reflector with electrically non conducting polycarbonate lens and trim Provide double gasket. Integral electronic ballast. UL listed for wet locations. Manufacturer Kirlin RR90636 Series Lamp Two F13 TT Watts: 26 Prescolite CF102SQ, or approved equal Two F26DTT Wall mounted enclosed and gasketed, vapor -tight compact fluorescent fixture. Cast metal housing, glass globe and guard. Integral low temperature ballast. U.L. listed for wet location. Manufacturer Crouse -Hinds VF Series Lamp Two F9TT Watts: 18 Manufacturer Lamp SECTION 16501 PAGE 1 LIGHT FIXTURE SCHEDULE Recessed compact fluorescent fixture with 8' square nominal aperture, drop opal lens, cold rolled steel housing, die -cast aluminum mounting frame, HPF ballast removable through housing. MAHLUM NORDFORMS McKINLEYGORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS FA 2 FA -3 FA -4 FB -2 Watts: 60 SECTION 16501 PAGE 2 LIGHT FIXTURE SCHEDULE Recessed lensed troffer nominal 24' x 48' x 5' code gauge steel housing, flush steel door with mitered corners, enclosed positive cam action latches and 125' extruded virgin acrylic prismatic lens. All interior metal surfaces to be painted high reflectance (minimum 90 percent) white paint. Electronic ballast. Manufacturer Columbia 4PS2 Series; Lithonia 2SP Series; Metalux 2GP Series, Williams Series 52 Lamp Two F32T8 Watts: 62 Recessed lensed troffer nominal 24 x 48' x 5' code gauge steel housing, flush steel door with mitered corners, enclosed positive cam action latches and 125' extruded virgin acrylic prismatic lens. All interior metal surfaces to be painted high reflectance (minimum 90 percent) white paint. Electronic ballast. Manufacturer Columbia 4PS Series; Lithonia 2SP Series; Metalux 2GP Series; Williams Series 52 Lamp. Three F32T8 Watts: 93 Recessed lensed troffer nominal 24 x 48' x 5' code gauge steel housing, flush steel door with mitered corners, enclosed positive cam action latches and 125' extruded virgin acrylic prismatic lens. All interior metal surfaces to be painted high reflectance (minimum 90 percent) white paint. Electronic ballast. Manufacturer Columbia 4PS Series; Lithonia 2SP Series; Metalux 2GP Series; Williams Series 52 Lamp Four F32T8 Watts: 124 Recessed lensed troffer nominal 24 x 24 x 5' code gauge steel housing, flush steel door with mitered corners, enclosed positive cam action latches and 125' extruded virgin acrylic prismatic lens. All interior metal surfaces to be painted high reflectance (minimum 90 percent) white paint. Electronic ballast. Manufacturer Columbia 4PS2 Series; Lithonia 2SP Series; Metalux 2GP Series, Williams Series 52 Lamp. Two F40 biax Watts: 74 FB -3 Recessed lensed troffer nominal 24' x 24 x 5' code gauge steel housing, flush steel door with mitered corners, enclosed positive cam action latches and 125' extruded virgin acrylic prismatic lens. All interior metal surfaces to be painted high reflectance (minimum 90 percent) white paint. Electronic ballast. Manufacturer Columbia 4PS2 Series; Lithonia 2SP Series; Metalux 2GP Series, Williams Series 52 Lamp Three F40 biax Watts: 93 FC Pendant mounted two lamp fluorescent strip fixture nominal 48' Die formed code gauge steel, high reflectance baked white enamel finish. Electronic ballast. Provide wireguard. MAHLUM NORDFORMS McIC NLEYGORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Manufacturer Columbia CS Series; Lithonia C Series; Metalux SS Series; Williams Series 75 Lamp: Two F32T8 Watts: 62 FD Surface mounted two lamp fluorescent industrial fixture, nominal 13' x 4 Die embossed reflector, heavy -gauge cold rolled steel housing. White enamel finish. Provide high power factor rapid start, CXBM/ETL and class 'P' electronic ballast. All metal parts shall be finished with high -gloss baked white enamel. Provide provision for chain hanging where noted on drawings. Manufacturer Lithonia AF Series; Columbia; Metalux Series Lamp: (2) F32T8 Watts: 66 SECTION 16501 PAGE 3 LIGHT FIXTURE SCHEDULE FE High performance bi- directional, wall mounted, 25 -1 /4'L x 6 -1 /4'W x 5 -1 /4'D with injection molded acrylic lens, cold rolled steel chassis with off white baked enamel finish. HPF ballast. Manufacturer Alkco 6700 Series Lamp Two F20T12 Watts: 20 FE2 High performance bi- directional, wall mounted, 49 -1 /4'L x 6 -1 /4'W x 5 -1 /4'D with injection molded acrylic lens, cold rolled steel chassis with off white baked enamel finish. HPF ballast. Manufacturer Alkco 6700 Series Lamp Two F30T12 Watts: 30 FE3 High performance bi- directional, wall mounted, 48 -1 /8 "L x 6 -3/4'W x 2 3/4 'D with injection molded acrylic lens, cold rolled steel chassis with off white baked enamel finish. HPF ballast. Manufacturer Alkco 3000 Series Lamp Two F32T8 Watts: 64 FF Recessed static fluorescent asymmetric/symmetric distribution lens troffer nominal 24 "x48' Fixture shall have a lens of 125 inch thick extruded 100% virgin acrylic with radio frequency interference shielding. Fixture shall have an extruded aluminum door frame with 45 degree mitered corners, held in place by spring loaded or positive cam action latches, safety lock hinges. Fixture shall be constructed of code gauge steel and finished in 98% minimum reflectance baked white enamel. Paint all parts after fabrication. Fixture shall be completely gasketed between lens and lens frame, the lens frame and the fixture housing, and the fixture housing with the ceiling system. Lamps 2 and 5 shall be controlled by a single dimming ballast. Remaining four lamps to be dual level switched. Lamps 1 and 6 shall be switched together and lamps 3 and 4 shall be switched together and. Manufacturer Alkco ST8240 Series; Kurtzon RFIOR -V -2 Series; Holcor SUR/FL Series; Failsafe MAF Series Lamps: Six F32T8 Watts: 196 MAHLUM NORDFORMS McKINLEYGORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS FG Low level recessed compact fluorescent night light. Louvered faceplate nominal 5' x 8 -1/2' with white enamel finich. FJ FG1 Compact fluorescent, wall mounted night light with hinged diecast louvered faceplate, tempered glass back panel, HPF ballast. FK1 Manufacturer. Prescolite 9690 Series Lamp. One F13DTT Watts: 17 Manufacturer Prescolite ALCF -4 or approved equal Lamp One PL/TT Watts: 9 No substitute excepted. Match existing fixture. Manufacturer 'Litecontrol MOD -66 -II Lamp Three T12 Watts: 34 No substitute excepted. Match existing fixture. Manufacturer Lithonia Architectural linear system or approved equal Lamp. Two T8 SECTION 16501 PAGE 4 LIGHT FIXTURE SCHEDULE FH Surface wall mounted fluorescent fixture, nominal 8 -1/4' wide x 7' deep x 48' long. 24 gauge steel housing with (2) lamps indirect and (2) direct. Indirect lamp housing shall be hinged to pivot forward. Lens shall be a wrap around snap in virgin acrylic. Provide energy efficient class `P' electronic ballast. Provide with 20 amp safety circuit. Manufacturer. Hill -Rom Specialite Series (Manufacturer's Phone 1- 800 -445 -3730) Lamp Four F32T8 Watts: 124 FH1 Bracket wall mounted.fluorescent direct /indirect fixture with 6' x 9 -1 /2 "x 48' high extruded aluminum housing, semi specular aluminum baffles, clear acrylic shielding for uplight and for top of louvers, finish to match existing fixtures. Recessed perimeter trough system with extruded aluminum ceiling trim flange with internal aligners nominally 8 "W x 9 -1 /2 "D in continuous lengths as shown per the contract documents, complete, with 22 gauge die formed housing, integral support flanges, internal aligner splines, chassis grounding and locking latches, staggered one lamp fluorescent strip units with telescoping end sections for lengths as indicated, illuminated corner modules as indicated, plug -in wiring connectors, die formed wall angle support, integral fixture backplate, internal semi specular anodized aluminum reflector for uniform vertical light distribution, and continuous prismatic acrylic lens. Provide lamp as reqired. Surface mounted one lamp fluorescent strip fixture nominal 48" Die formed code gauge steel, high reflectance baked white enamel finish. Electronic ballast. J Manufacturer Columbia CS Series; Lithonia C Series, Metalux SS Series; Daybrite T Series Lamp. One F32T8 Watts: 32 1 MAHLUM NORDFORMS McKINLEYGORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS M1 UC2 UC3 UC4 X1 Recessed metal halide downlight, nominal 8" aperture and 15" depth. Clear light bronze Alzak lower reflector cone, clear Alzak upper cone with self flanged overlap trim. Fixture shall have a 45° cut-off to the lamp. Provide clear tempered glass safety lens above lower cone. Manufacturer Kurt Versen R7330 Series. No Substitutions Lamp. One M70/U (Philips) MasterColor Watts: 89 130 SECTION 16501 PAGE 5, LIGHT FIXTURE SCHEDULE Undercabinet tasklight nominal 24' with solid front, not to exceed 1 9/16' high, shall have a 45 degree batwing acrylic prismatic lens. Constructed of code gauge steel with baked white enamel finish. Hardwired and switched at wall. Electronic ballast. Manufacturer Alkco SF317 Series; Litecontrol Taska; Failsafe MTS Series Lamp. One F17T8 Watts: 23 Undercabinet tasklight nominal 36' with solid front, not to exceed 1 9/16' high, shall have a 45 degree batwing acrylic prismatic lens. Constructed of code gauge steel with baked white enamel finish. Hardwired and switched at wall. Electronic ballast. Manufacturer Alkco SF325 Series; Litecontrol Taska; Failsafe MTS Series Lamp One F25T8 Watts: 30 Undercabinet tasklight nominal 48' with solid front, not to exceed 1 9/16' high, shall have a 45 degree batwing acrylic prismatic lens. Constructed of code gauge steel with baked white enamel finish. Hardwired and switched at wall. Electronic ballast. Manufacturer Alkco SF332 Series; Litecontrol Taska; Failsafe MTS Series Lamp One F32T8 Watts: 32 Single face green LED exit sign. Diecast aluminum housing, universal arrows and universal mount. Faceplate shall be cast aluminum stencil face manufacturers standard finish as selected by architect. Illumination shall be provided by green LED lamp embedded in fiber optic cabling. Assembly shall be held in place within the diecast fixture frame using reinforced plastic or metallic clips. Input wattage shall not exceed 7 watts. Alternately provide LEDs inside acrylic panels to evenly illuminate letters. Two circuit with integral transfer relay All lamps to be `on' with either circuit. Rated lamp life shall be 20 years minimum. Shall meet UL Standard 924 Manufacturer Devine LEDU70 -SG -WH Series; Emergi -Lite Precepter LED Series Lamp LED Green Supplied with fixture Watts: 7 max X2 Dual face green LED exit sign. Diecast aluminum housing, universal arrows and universal mount. Faceplate shall be cast aluminum stencil face manufacturers standard finish as selected by architect. Illumination shall be provided by green LED lamp embedded in fiber optic cabling. Assembly shall be held in place within the diecast fixture frame using reinforced plastic or metallic clips. Input wattage shall not exceed 7 watts. Alternately provide LEDs inside acrylic panels to evenly illuminate letters. Two circuit with integral MAHLUM NORDFORMS McKINLEYGORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16501 PAGE 6 LIGHT FIXTURE SCHEDULE transfer relay All lamps to be `on' with either circuit. Rated lamp life shall be 20 years minimum. Shall meet UL Standard 924 Manufacturer Devine LEDU75 -SG -WH Series;Emergi -Lite Precepter LED Series Lamp LED Green Supplied with fixture Watts: 7 max END OF SECTION 16501 t 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Provide isolated power systems for all Operating Rooms. 1.2 RELATED WORK SPECIFIED ELSEWHERE Raceways, Section 16110 Equipotential Grounding System, Section 16670 1.3 QUALITY ASSURANCE Refer to Section 16010, General Provisions, for applicable codes. System shall meet all requirements of NFPA 99 and NFPA 70 (NEC) Section 517 for a non flammable anesthetizing location. 1.4 SUBMITTALS 1.5 ELECTRICAL EQUIPMENT MAINTENANCE MANUAL SECTION 16660 PAGE 1 ISOLATED POWER SYSTEM Assemble in submittal brochure as specified in Section 16100 Include shop drawings showing front view side view dimensions, electrical specifications, and nameplate information for isolated power panels and accessories. Manual shall include the test report required under this section and the information required in Section 16010 PART 2 PRODUCTS 2.1 MANUFACTURE The manufacturer shall be a firm which is regularly engaged in manufacturing such products and shall have existing proven installations of like products. This manufacturer need not be same as that of other distribution equipment contained elsewhere in these specifications. All isolated power equipment shall be UL listed under Standard 1047 Approved Manufacturers: Hospital Systems, Isotrol, Post Glover, or Square D 2.2 ENCLOSURES A. Flush mounted enclosure with galvanized steel finish. B. Cabinet fronts on all equipment shall be stainless steel with satin finish and lockable door over the circuit breakers. All components shall withstand the application of normal hospital cleaning agents without degradation. 2.3 ISOLATED POWER PANEL A. The isolated power panel shall contain line isolation monitor isolation transformer circuit breaker panelboard, leakage ammeter, reference ground bus, alarm, and other accessories as herein specified. All components shall be contained in a flush mounted enclosure no more than 8" deep. B. Line isolation monitor shall be a 25 microampere dynamic type and shall monitor the total leakage for the system. A meter shall display system leakage with the 5 milliampere zone at center of scale. All combinations of capacitance and/or resistive faults shall be detected. Provide test pushbutton to produce MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16660 PAGE 2 ISOLATED POWER SYSTEM system test including meter readout. Fixed alarm at 5 milliamps. The line isolation monitor shall be U.L. listed under standard 1022. C. Isolation Transformer 5 0 KVA 60 Hert2, 208 volt primary with 120 volt secondary Transformer shall have a 27 db maximum sound level and meet all NEMA requirements for two winding electrostatic shielding isolation transformers. The leakage from the secondary to ground shall not exceed the values shown in table 29.2 of U.L. Standard 1047 Provide input (transformer primary) circuit breaker D Secondary Circuit Panelboard: Provide ten (10) 10 amp, isolated branch circuit breakers. E. Reference Ground Bus: Provide a ground bus with provision for bolted termination of at least ten (10) No. 10 AWG ground wires. F Indicator and micro- ammeter module: Provide panel mounted Indicator and micro- ammeter module. Provide an alarm buzzer which sounds an alarm when total system leakage exceeds 5 milliamps. Provide an indicator unit including green light, "normal," red light, "abnormal;" and amber light, "acknowledgment," alarm and silence switch. Include microanuneter Indicator and micro- ammeter module shall be accessible without opening door G. Remote Indicator• Provide remote indicator unit for each isolated power panel. Indicator unit shall including alarm buzzer, green light, "normal;" red light, "abnormal;" and amber light, "acknowledgment," alarm and silence switch. H. Nameplate: 1 Provide an engraved phenolic nameplate attached to panel. Information to include panel name voltage, phase and wire in 3/16' high letters and the source the panel is fed from in 1/8" high letters. 2. Nameplate color Normal system white letters on black. Emergency system white letters on red. 2.4 ISOLATED POWER BRANCH CIRCUITS A. Electrical Metallic Tubing: Refer to Section 16110 B Wire: Copper stranded conductor with cross linked polyethylene insulation (type XHHW) having a dielectric constant of 3.5 or less. PART 3 EXECUTION 3.1 RACEWAYS Refer to Section 16110 All raceways shall be concealed. 3.2 CONDUCTORS Do not use pulling compound. Do not share neutral. Wires shall be unspliced from the isolated power panel to the outlets. Color code wire per NEC 517 160(a)(5) using colored tape or insulation of the proper color MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS 3.3 GROUNDING Install #10 type THW or •HHN green ground wires (one per each circuit). continuous and unspliced from the ground bus in the isolated power panel to the ground connection at each receptacle, device, or switch. 3.4 REMOTE INDICATOR Install remote indicator in Operating Room. Provide all necessary wiring. 3.4 TESTING After the installation of the isolated power system and Equipotential Grounding System has been completed, the equipment manufacturer with assistance from the Contractor shall perform the following tests in accordance with NFPA 99 1 The impedance (capacitive and resistive) to ground of all conductors with the connection between the line isolation monitor and reference grounding point open. Replace wiring that measures less than 200,000 ohms. 2. Potential difference and resistances between the isolated power panel ground bus and the grounding pole of each receptacle and the patient grounding point. Also measure the potential between the grounding pole of each one of the receptacles and each of the other receptacles. The potential difference shall not exceed 10 millivolts with the system both energized and not energized 3 System voltage. SECTION 16660 PAGE 3 ISOLATED POWER SYSTEM 4 Readings of ungrounded system components including isolation transformer and line isolation monitor 5 System leakage with line isolation monitor connected in circuit. 6 System leakage with surgery track light and film viewers energized. 7 Tests described in Equipotential Grounding System, Section 16670 B Record all test values and include them in the maintenance manual information. C Submit a copy of test results to the Engineer no longer than one week after tests are completed along with a letter stating that the installed system meets the requirements of the plans and specifications. D In conjunction with these tests, the system shall be demonstrated and the operation and maintenance aspects explained to the Owner's personnel. MAHLUM• NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS ISOLATED POWER SYSTEM APPENDIX 1 NEW PANELS SECTION 16660 PAGE 4 ISOLATED POWER SYSTEM IIIIII NM r M MO MI MI MN OR ISOLATED POWER PANEL SCHEDULE NAME. NOR1 LOCATION: 1st FLOOR CORRIDOR C106 ROOM# LOAD TRIP TYPE DESCRIPTION KVA RATING REC OR#1 CEILING 0.4 REC OR #1 NORTH WALL SPARE SPARE SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 2.5 100% 1st. 2.5 REC 50% 'HVAC 100% KIT 100% S. ITS 100% EQUIP 100% MISC 100% TOTAL 2.5 100% 0.5 O 0 VOLTAGE. 120/ 1 ph. 2 wire I I 0 0 60A BUS TRIP LOAD RATING KVA TYPE DESCRIPTION 20/ 2 1 -1 1 2 20/ 2 0.5IREC OR #1 EAST ANDNORTH WALL 2 t 2 I 20/ 2 3 it I 4 20/ 2 0.4 REC OR #1 SOUTH WALL\ 2 f 2 20/ 2 5 6 20/ 2 0.4 REC OR #1 SOUTH WALL 2 -i r 2 20/ 2 7 8 20/ 2 0.4 REC OR CEILING 2 2 20/ 2 9 10 20/ 2 SPARE 2 2 11 12 13 4 14 15 1 16 17 18 20 NOTES: PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER 2.5 FEEDER LENGTH: REV FEED THRU LUGS FEEDER: I DATE. DOUBLE LUGS SPARLING, INC 1 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 1.3 100% 1.3 11 B: 1.3 100% 1.3 11 NEC TOTAL. I 2.521 1 2.51 21 CIRCUIT BREAKER CODE G GFCI H HID RATED 5 SHUNT TRIP 0 SWITCHING DUTY FED FROM: DOWNSTREAM LOAD INFORMATION OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/$1/97 ISOLATED POWER PANEL SCHEDULE SPARLING, INC NAME. NOR2 0 0 I VOLTAGE. 120/ 1 ph. 2 wire LOCATION: 1st FLOOR CORRIDOR C106 ROOM# I 0 0 1 1 60A BUS 10 KAIC LOAD TRIP TRIP LOAD TYPE DESCRIPTION KVA RATING I RATING KVA TYPE DESCRIPTION REC OR #2 CEILING I 0.4 20/ 2 1 2 20/ 2 0.4IREC OR #2 NORTH WALLS REC OR#2 SOUTH AND WEST WALL 2 2 REC OR #2 CEILING I 0.4 20/ 2 3 4 20/ 2 0.4 REC OR #2 NORTH WALL I 2 2 I 0.4 20/ 2 5 6 20/ 2 0.5 REC OR #2 WEST WALL I 2 2 SPARE I 20/ 2 7 8 20/ 2 0.5 REC OR #2 EASTWALLS I 2 2 SPARE I 20/ 2 9 10 20/ 2 SPARE I 2 2 SPARE I 11 12 I I 13 t 14 I I 15 16 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) .LTS 125% REC 1st. 2.9 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FED FROM: TOTAL 2.9 100% 2.9 FEEDER LENGTH: FEEDER: OLYMPIC MEMORIAL HOSPITAL 17 18 I 19 1 20 NOTES: 1st. 2.9 PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER I DOWNSTREAM LOAD INFORMATION REV FEED THRU LUGS I DATE. IIDOUBLE LUGS I I 16660 APPENDIX CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A. 1.5 100% 1.5 12 B: 1.5 100% 1.5 12 NEC TOTAL. I 2.921 I 2.91 24 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUN 7/21/97 J r r we r r r rr r' r as r as r— r— aim r OM r r N r MI s REC OR #3 CEILING SPARE SPARE SPARE ISOLATED POWER PANEL SCHEDULE (NAME. NOR3 'LOCATION: 1st FLOOR CORRIDOR C105 ROOM# LOAD TYPE DESCRIPTION KVA REC OR#3 CEILING 0.4 0.4 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 2.7 100% 1st. 2.7 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FED FROM: TOTAL 2.7 100% 2.7 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 2 2 201 2 20/ 2 2 20/ 2 2 20/ 2 2 1 11 13 15 17 19 O 0 I I O 0 60A TRIP RATING 2 20/ 2 2 4 20/ 2 2 6 20/ 2 2 8 20/2 2 10 20/ 2 2 NOTES: 12 14 16 18 20 PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER VOLTAGE. BUS 10 KAIC LOAD INA TYPE DESCRIPTION 0.4 REC OR #3 NORTH WALL 0.5 0.5 0.5 120! 1 ph REC OR #3 NORTH AND SOUTH WALL REC OR #3 EAST WALL REC OR #3 WEST WALL SPARE SPARLING, INC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A. 1.4 100% 1.4 11 B: 1.4 100% 1.4 11 NEC TOTAL.1 2.741 I 2.71 23 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV' FEED THRU LUGS I I DATE. DOUBLE LUGS OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/21/97 ISOLATED POWER PANEL SCHEDULE NAME. NORM LOCATION: 1st FLOOR CORRIDOR C108 1 YPE DESCRIPTION REC OR #4 NORTH WALL SPARE SPARE SPARE SPARE LTS 125% REC 1st. 2.2 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% TOTAL 2.2 100% OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD KVA 0.4 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) FED FROM: 2.2 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 2 2 20/ 2 2 20/ 2 2 20/ 2 2 20/ 2 2 11 15 17 19 0 0 l I 0 0 60A TRIP RATING 1 2 20/ 2 2 3 4 20/ 2 2 5 f 6 20/2 2 7 8 20/ 2 2 9 I 10 20/ 2 2 13 NOTES: 16660 APPENDIX 12 14 16 18 20 1st. 2.2 PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER VOLTAGE. 120/ 1 ph. 2 µere BUS LOAD KVA TYPE DESCRIPTION 0.5 REC OR #4 EAST WALL 0.5 0.4 0.4 REC OR #4 WEST WALL REC OR #4 CEILING REC OR #4 CEILING SPARE SPARLING, INC 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 1.1 100% 1.1 9 B: 1.1 100% 1.1 9 NEC TOTAL. I 2.161 I 2.21 18 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION I REV' FEED THRU LUGS I I DATE. !DOUBLE LUGS I 7/21/97 NM =II M MI r r r r M OM I= i r 1ISOLATED POWER PANEL SCHEDULE 1 NAME. NOR5 L OCATION: 1st FLOOR CORRIDOR C108 [PIPE DESCRIPTION (REC OR #5 NORTH WALL SPARE SPARE SPARE SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 2.2 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FOTAL 2.2 100% ROOM# LOAD KVA 0.5 MI 101111 MI MI N MI NM M E MR TRIP RATING 20/ 2 2 20/2 2 20/ 2 2 20/2 2 20/ 2 2 1 11 13 15 17 19 0 0 VOLTAGE. 120/ I ph. 2 wire I I- 0 0 60A BUS NOTES: 16 18 20 1st. 2.2 PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER TRIP LOAD RATING KVA TYPE DESCRIPTION 2 20/ 2 I 0.5 REC OR #5 SOUTH WALL 2I 4 20/2 0.4 2 6 20/2 0.4 2 8 20/' 2 0.4 2 10 20/ 2 2 12 14 REC OR #5 CEILING REC OR #5 CEILING REC OR #5 WEST WALL SPARE FED FROM: I 2.2 FEEDER LENGTH: I I REV' FEED THRU LUGS FEEDER: I I DATE DOUBLE LUGS SPARLING, INC :10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A. 1.1 100% 1 1 9 8: 1.1 100% 1.1 9 NEC TOTAL.' 2.21 1 2.21 18 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/21/97 !ISOLATED POWER PANEL SCHEDULE NAME. NOR6 LOCATION: 1st FLOOR CORRIDOR C104 TYPE DESCRIPTION REC OR #6 CEILING REC OR #6 NORTH AND EAST WALLS REC OR #6 NORTH AND WEST WALLS SPARE SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 2.7 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% TOTAL 2.7 100% OLYMPIC MEMORIAL HOSPITAL 1st. 2.7 PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER FED FROM: 2.7 FEEDER LENGTH: FEEDER: SPARLING, INC 0 0 VOLTAGE. 120/ 1 ph. 2 wire I I ROOM# 0 0 60A BUS LOAD TRIP TRIP LOAD KVA RATING RATING KVA TYPE DESCRIPTION 0.4 20/ 2 1 2 20/2 0.5 REC OR #6 SOUTH WALLS 2 I 1 r 2 0.4 20/ 2 3 4 20/ 2 0 4 REC OR #6 SOUTH WALL 2 2 0.4 20/ 2 5 6 20/ 2 0.4 REC OR #6 WEST WALL 2 2 20/ 2 7 8 20/ 2 0.4 REC OR #6 CEILING 2 2 20/ 2 9 10 20/ 2 SPARE 2 2 11 12 13 14 15 16 17 18 19 20 NOTES: 16660 APPENDIX 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 1.4 100% 1.4 11 B: 1 4 100% 1.4 11 NEC TOTAL.' 2.741 1 2.71 23 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION I REV FEED THRU LUGS I I DATE !IDOUBLE LUGS I I 7/21/97 MS NM M MN MI MI MI O r all GM ION MI I• NAME. NOR7 LOCATION: 1st FLOOR SCRUB/GOWN TYPE DESCRIPTION REC OR #7 SOUTH WALL REC OR #7 EAST WALL REC OR #7 CEILING REC OR #7 CEILING SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 125% REC 1st. 2.7 100% REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% TOTAL 2.7 100% ROOM# SS122 LOAD TRIP KVA RATING 0.51 20/ 2 2 0.41 20/ 2 2 0.4 20/ 2 2 0.4 20/ 2 2 20/ 2 2 1st. 2.7 PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER NM MI I IIIIII I 1111O IIIII 1 ISOLATED POWER PANEL SCHEDULE SPARLING, INC 0 0 I I 0 0 60A TRIP RATING 1 -7+ 2 20/ 2 2 3 4 20/2 2 6 20/ 2 2 8 20/ 2 2 10 20/ 2 2 11 12 13 14 15 16 17 18 19 20 NOTES: VOLTAGE. 120/ 1 ph. 2 wire BUS LOAD KVA TYPE DESCRIPTION 0.5 REC OR #7 EAST AND NORTH WALL 0.4 REC OR #7 EAST AND WEST WALL SPARE SPARE SPARE CONN. NEC NEC LOAD NEC PHASE (KVA) FACT. (KVA) AMPS A. 1.3 100% 1.3 11 B: 1.3 100% 1.3 11 NEC TOTAL. I 2.681 1 2.71 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY FED FROM: I DOWNSTREAM LOAD INFORMATION 2.7 FEEDER LENGTH: I I REV' FEED THRU LUGS FEEDER: 1 I DATE. DOUBLE LUGS 10 KAIC OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/21/97 ISOLATED POWER PANEL SCHEDULE NAME. YOR1 LOCATION: 1st FLOOR CORRIDOR C106 TYPE DESCRIPTION LTS SURGERY LIGHT OR #1 REC OR #1 EAST WALL REC OR #1 SOUTH WALL REC OR #1 SOUTH AND WEST WALLS SPARE LOAD CONN. NEC CALCULATED TYPE (KVA) FACTOR LTS 0.8 125% REC 1st 2.9 100% 'REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% TOTAL 3.8 106% OLYMPIC MEMORIAL HOSPITAL I I NEC CALC. LOAD (KVA) 11 1st. 2.9 ROOM# LOAD KVA 0.8 0.5 0.5 0.5 FED FROM: 4.0 FEEDER LENGTH: FEEDER: TRIP RATING 20/ 2 2 20/ 2 2 20/ 2 2 20/ 2 2 20/ 2 2 o 0 I I 0 0 60A TRIP RATING 1 F 2 20/ 2 2 3 4 20/ 2 2 5 6 20/ 2 2 7 8 20/2 2 9 10 20/ 2 2 11 t 12 13 15 17 19 NOTES: PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER DOWNSTREAM LOAD INFORMATION 1 I REV' FEED THRU LUGS I 1 DATE. IIDOUBLE LUGS I I 16660 APPENDIX 14 16 18 20 VOLTAGE. 1201 1 ph 2 wire BUS LOAD INA TYPE DESCRIPTION 0.5 IREC OR #1 NORTH WALL 0.4 0.4 REC OR #1 CEILING REC OR CEILING SPARE SPARE CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A. 1.9 106% 2.0 17 B: 1.9 106% 2.0 17 NEC TOTAL I 3.761 1 4.01 33 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY SPARLING, INC 10 KAIC 7/21/97 OM r NM E NM M- i E NM MN NM I i• ISOLATED POWER PANEL SCHEDULE (NAME. YOR2 (LOCATION: 1st FLOOR CORRIDOR C106 1 TYPE DESCRIPTION LTS SURGERY LIGHT OR #2 REC OR #2 NORTH WALL REC OR #2 NORTH WALL REC OR #2 WEST WALL SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.8 125% 1.0 REC 1st. 2.7 100% 1st. 2.7 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% TOTAL 3.5 106% ROOM LOAD TRIP KVA RATING 08 20/2 2 0.5 20/ 2 2 0.4 20/ 2 2 0.5 20/ 2 2 20/ 2 2 LI 11 13 15 17 19 0 0 I I 0 0 NOTES: PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER VOLTAGE. 60A BUS TRIP RATING 2 20/ 2 f 2 4 20/ 2 2 6 20/ 2 2 8 20/ 2 2 10 20/ 2 2 12 14 16 18 20 120/ LOAD KVA TYPE DESCRIPTION 0.5IREC OR #2 EAST WAEL 0.4IREC OR CEILING 0.4IREC OR CEILING SPARE SPARE SPARLING, INC 1 ph. 2 wire FED FROM: I DOWNSTREAM LOAD INFORMATION 3.7 FEEDER LENGTH: I I REV' FEED THRU LUGS FEEDER: I I DATE. DOUBLE LUGS' I 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A. 1.7 106% 1.8 15 8: 1.7 .106% 1.8 15 NEC TOTAL.1 3.461 1 3.71 31 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/21/97 C ISOLATED POWER PANEL SCHEDULE YOR3 I OR3 LOCATION: 1st FLOOR CORRIDOR C105 TYPE DESCRIPTION LTS SURGERY LIGHT OR #3 REC OR #3 NORTH WALL REC OR #3 NORTH AND EAST WALL REC OR #3 EAST WALL SPARE OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD TRIP KVA RATING 0.81 20/ 2 1 I 2 0.41 20/ 2 3 2 0.51 20/ 2 5 1 2 0.5 2012 7 2 0.5 20/ 2 9 2 11 13 15 17 7 1 i O 0 VOLTAGE. 120/ 1 ph. 2 wire I I O 0 f 8 10 12 14 16 18 2 I 41 6 60A TRIP RATING 20/ 2 2 20/ 2 2 20/ 2 2 2012 2 20/ 2 2 BUS LOAD KVA TYPE DESCRIPTION 0.5 IREC OR #3 WEST WALL 0.4 0.4 REC OR #3 CEILING REC OR #3 CEILING SPARE SPARE SPARLING, INC 10 KAIC I 19 20 I LOAD CONN. NEC CALCULATED NEC CALC. CONN. NEC NEC LOAD NEC TYPE (KVA) FACTOR LOAD (KVA) NOTES I PHASE (KVA) FACT. (KVA) AMPS REC LTS 0.8 125% 11 A: 2.1 106% 2.2 18 REC 1st. 2.7 100% 151.2.7 PROVIDE 5 KVA ISLOLATED POWER B: 2.1 106% 2.2 18 50% TRANSFORMER WITH 208V 1 PH PRIMARY HVAC 100% AND 120V 1 PH SECONDARY t NEC TOTAL.I 4.121 I 4.41 36 KIT 100% PROVIDE 30A MAIN CIRCUIT BREAKER CIRCUIT BREAKER CODE S. LTS 100% G GFCI H HID RATED EQUIP 100% S SHUNT TRIP D SWITCHING DUTY MISC 100% FED FROM: I II DOWNSTREAM LOAD INFORMATION TOTAL 3.6 106% 3.8 FEEDER LENGTH: I I REV' FEED THRU LUGS FEEDER: I I DATE DOUBLE LUGS I I 16660 APPENDIX 7/21/97 O i s MI I i MI i ISOLATED POWER PANEL SCHEDULE SPARLING, INC NAME. YOR4 LOCATION: 1st FLOOR CORRIDOR C108 TYPE DESCRIPTION LTS SURGERY LIGHT OR #4 REC OR #4 EAST6 WALL REC OR #4 SOUTH ANS EAST WALL REC OR #4 WEST WALL SPARE LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.8 125% 1.1 REC 1st. 3.0 100% 1st. 3.0 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% ROOM# LOAD TRIP KVA RATING 0.8 20/ 2 1 2 0.5 20/ 2 3 2 0.5 20/ 2 5 2 0.5 20/2 7 2 20/ 2 9 2 11 13 15 17 19 0 0 I I 0 0 NOTES: 60A BUS 10 KAIC TRIP LOAD RATING KVA TYPE DESCRIPTION 2 20/ 2 I 0.41IREC OR #4 CEILING 21 4 20/ 2 I 0.4 REC OR #4 CEILING 21 6 20/ 2 I 0.5 IREC OR #4 NORTH WALL 2 8 20/ 2 I SPARE 21 10 20/ 2 I SPARE 2 12 14 16 18 20 PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER VOLTAGE. 120/ 1 ph. 2 wire MISC 100% FED FROM: I II DOWNSTREAM LOAD INFORMATION TOTAL 3.8 106% 4.0 FEEDER LENGTH: I I REV' IIFEED THRU LUGS I FEEDER: I I DATE. IIDOUBLE LUGS CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 1.9 106% 2.0 17 B: 1.9 106% 2.0 17 NEC TOTAL I 3.81 I 4.01 33 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/41/97 !ISOLATED POWER PANEL SCHEDULE 1NAME. YOR5 OCATION: TYPE DESCRIPTION LTS SURGERY LIGHT #5 OLYMPIC MEMORIAL HOSPITAL 1st FLOOR CORRIDOR C108 REC OR #5 SOUTH AND WEST WALL REC OR #5 SOUTH WALL REC OR #5 CEILING SPARE ROOM/ LOAD TRIP KVA RATING 0.8 20/ 2 2 I 0.5 20/ 2 2 0.5 20/ 2 2 0.4 20/ 2 2 20/ 2 2 LOAD CONN. NEC CALCULATED NEC CALL. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.8 125% 1.1 REC 1st. 2.9 100% 1st. 2.9 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FED FROM: TOTAL 3.8 106% 4.0 FEEDER LENGTH: FEEDER: 11 13 15 17 19 0 0 I I 0 0 NOTES: PROVIDE 5 KVA ISLOLATED POWER TRANSFORMER WITH 208V 1 PH PRIMARY AND 120V 1 PH SECONDARY PROVIDE 30A MAIN CIRCUIT BREAKER VOLTAGE. 120/ 1 ph 60A BUS TRIP LOAD RATING KVA TYPE DESCRIPTION 2 20/ 2 0.4 REC OR #5 CEILING 2 4 20/ 2 0.5 REC OR #5 WEST WAIL 2 6 201 2 0.5 REC OR #5 NORTH WALL 2 8 20/ 2 SPARE 2 10 20/ 2 SPARE 2 12 14 16 18 20 SPARLING, INC 2 "Am 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 1.9 106% 2.0 17 B: 1.9 106% 2.0 17 NEC TOTAL. I 3.761 1 4.01 33 CIRCUIT BREAKER CODE G GFCI H HID RATED SHUNT TRIP D SWITCHING DUTY II DOWNSTREAM LOAD INFORMATION REV FEED THRU LUGS I I DATE. DOUBLE LUGS 16660 APPENDIX 7/21/97 mom ses mi Nom a— i or womilmosw NM I MN OM M M NE UM M IIIII ISOLATED POWER PANEL SCHEDULE SPARLING, INC NAME. YORE 0 0 I VOLTAGE. 120/ 1 ph. 2 wire I I LOCATION: 1st FLOOR CORRIDOR C104 0 0 10 KAIC TYPE DESCRIPTION LTS SURGERY LIGHT OR #6 LOAD KVA TYPE DESCRIPTION 074IREC OR #6 CEILING 11 12 13 14 15 16 17 1 18 19 I iw 20 LOAD CONN. NEC CALCULATED NEC CALC. CONN. NEC NEC LOAD NEC TYPE (KVA) FACTOR LOAD (KVA) NOTES: PHASE (KVA) FACT (KVA) AMPS LTS 0.8 125% 1.1 A: 2.0 105% 2.1 17 REC 1s1.3.1 100% 1st. 3.1 PROVIDE 5 KVA ISLOLATED POWER B: 2.0 105% 2.1 17 REC 50% TRANSFORMER WITH 208V 1 PH PRIMARY HVAC 100% AND 120V 1 PH SECONDARY NEC TOTAL 1 3.981 1 4.21 35 KIT 100% PROVIDE 30A MAIN CIRCUIT BREAKER CIRCUIT BREAKER CODE 3. LTS 100% G GFCI H HID RATED EQUIP 100% S SHUNT TRIP D SWITCHING DUTY MISC 100% FED FROM: I II DOWNSTREAM LOAD INFORMATION TOTAL 4.0 105% 4.2 FEEDER LENGTH: I I REV' I1FEED THRU LUGS FEEDER: I I DATE. IIDOUBLE LUGS I REC OR #6 SOUTH WALL REC OR #6 SOUTH WALL REC OR #6 WEST WALL SPARE ROOMIt LOAD TRIP KVA RATING 0.8 20/ 2 2 0.4 20/ 2 2 0.4 20/ 2 2 0.5 20/ 2 2 20/ 2 2 60A BUS TRIP RATING 2 20/ 2 2 4 20/ 2 2 6 20/ 2 2 8 20/ 2 2 10 20/ 2 2 0.4 0.5 0.5 REC OR #6 CEILING REC OR #6 WEST AND NORTH WALL REC OR #6 EAST WALL SPARE OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/21/97 ISOLATED POWER PANEL SCHEDULE (NAME. Y0R7 LOCATION: 1st FLOOR OR #7 SCRUB/GOWN I 1 TYPE DESCRIPTION LTS SURGERY LIGHT OR #7 REC OR #7 CEILING REC OR #7 EAST WALL REC OR #7 WEST WALL SPARE OLYMPIC MEMORIAL HOSPITAL 0 0 VOLTAGE. 120/ 1 ph. I I ROOM# SS122 0 0 60A BUS LOAD TRIP TRIP LOAD KVA RATING RATING KVA TYPE DESCRIPTION 0.8 20/ 2 1 2 20/ 2 0.4IREC OR #7 SOUTH I 2 2 I I 0.4 20/ 2 3 4 20/ 2 0.5IREC OR #7 SOUTH WALL 2 2 I I 0.4 20/ 2 5 6 20/ 2 0.5IREC OR #7 EAST WALL I 2 2 I I 0.5 20/ 2 7 8 20/ 2 0.4IREC OR #7 CEILING I 2 2 I I 20/ 2 9 10 20/ 2 (SPARE I 2 2 I I 11 12 I I 13 14 15 16 17 18 I 19 20 I LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.8 125% 1.0 REC 1st. 3.1 100% 1st. 3.1 PROVIDE 5 KVA ISLOLATED POWER REC 50% TRANSFORMER WITH 208V 1 PH PRIMARY HVAC 100% AND 120V 1 PH SECONDARY KIT 100% PROVIDE 30A MAIN CIRCUIT BREAKER S. LTS 100% EQUIP 100% MISC 100% FED FROM: I DOWNSTREAM LOAD INFORMATION NOTES: TOTAL 3.9 105% 4.1 FEEDER LENGTH: I I REV' FEED THRU LUGS I FEEDER: I I DATE. DOUBLE LUGS I I 16660 APPENDIX SPARLING, INC 2 wire 10 KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 2.0 105% 2.1 17 B: 2.0 105% 2.1 17 NEC TOTAL. I 3.94 I 1 4.11 35 CIRCUIT BREAKER CODE G GFCI H HID RATED 5 SHUNT TRIP D SWITCHING DUTY 7/21/97 ME MN M i MN M EM- NM MN M I MI MI r MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS ISOLATED POWER SYSTEM APPENDIX 1 EXISTING SYSTEMS TO BE DEMOLISHED FOR REFERENCE ONLY SECTION 16660 PAGE 5 ISOLATED POWER SYSTEM END OF SECTION 16660 um mu u am wit ma kf m .ma ace t MP ISOLATED POWER PANEL SCHEDULE SPARLING, INC NAME. OR1 EXISTING LOCATION: SURGERY CORRIDOR CLOSET TYPE REC DESCRIPTION REC REC FILM ILLUM, CLOCK REC FILM ILLUM, CLOCK LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.7 125% 0.9 REC 1st. 4.0 100% 1st. 4.0 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% ROOM# LOAD TRIP 30A KVA RATING 0.71 20/ 2 I 1 21 0.71 20/2 1 3 2 0.61 20/ 2 5 2 0.6 20/ 2 7 2 9 11 13 15 17 19 0 0 1 NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 10 12 14 16 18 20 TRIP RATING 2 20/ 2 2 4 20/ 2 2 6 20/2 2 8 20/ 2 2 VOLTAGE. BUS 208/ 1 ph. r 30A 2P MAIN BREAKER LOAD KVA TYPE DESCRIPTION 0.7 REC 0.7 LTS CORD DROP SURGERY 0.4 0.4 REC FILM ILLUM, CLOCK REC FILM ILLUM, CLOCK I CONN. NEC NEC LOAD NEC 1 PHASE (KVA) FACT (KVA) AMPS A: 2.3 104% 2.4 12 B: 2.3 104% 2.4 12 G GFCI S SHUNT TRIP NEC TOTAL. I 4.681 1 4.91 23 CIRCUIT BREAKER CODE H HID RATED D SWITCHING DUTY MISC 100% FED FROM: I DOWNSTREAM LOAD INFORMATION TOTAL 4.7 104% 4.9 FEEDER LENGTH: I REV' FEED THRU LUGS I FEEDER: DATE. IIDOUBLE LUGS i 2 wire KAIC OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7/21/97 ISOLATED POWER PANEL SCHEDULE NAME. OR2 EXISTING O O I 30A LOCATION: SURGERY CORRIDOR CLOSET ROOM# LOAD TRIP TYPE DESCRIPTION KVA RATING REC I 0.7 20/ 2 1 I 2 REC I 0.7 2012 3 I 2 REC FILM ILLUM, CLOCK I 0.6 2012 5 2 REC FILM ILIUM, CLOCK 0.6 20/ 2 7 I 2 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.7 125% 0.9 REC 1st. 4.0 100% 1st. 4.0 OLYMPIC MEMORIAL HOSPITAL 9 11 13 15 17 19 NOTES: 16660 APPENDIX TRIP RATING 2 20/ 2 2 4 20/ 2 2 6 20/ 2 2 8 20/ 2 2 10 12 14 16 18 20 VOLTAGE. BUS 208/ 1 ph. 30A 2P MAIN BREAKER LOAD KVA TYPE DESCRIPTION 0.7IREC 0.7ILTS CORD DROP SURGERY 0.4 REC FILM ILIUM, CLOCK 0.4 REC FILM ILIUM, CLOCK SPARLING, INC 2 Mre KAIC CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 2.3 104% 2.4 12 B: 2.3 104% 2.4 12 REC 50% EXISTING PANEL FOR REFERENCE ONLY HVAC 100% PANEL TO BE DELETED NEC TOTAL. I 4.681 I 4.91 23 KIT 100% SEE PLANS FOR CIRCUIT RELOCATIONS CIRCUIT BREAKER CODE S. LTS 100% 0 GFCI H HID RATED EQUIP 100% S SHUNT TRIP D SWITCHING DUTY MISC 100% FED FROM: I DOWNSTREAM LOAD INFORMATION TOTAL 4.7 104% 4.9 FEEDER LENGTH: I 1 REV FEED THRU LUGS I I FEEDER: I I DATE. IIDOUBLE LUGS I I 7/21/97 MID Cm\ ma mu hem MIN MIL 21i* 1•14 Mit NO nit OM set NS al wig, oft ice' NO so lair ISOLATED POWER PANEL SCHEDULE SPARLING, INC NAME. 0R3 EXISTING LOCATION: CENTAL STERILE ROOMtt LOAD TYPE DESCRIPTION KVA REC 0.7 REC 0.7 REC FILM ILLUM, CLOCK I 0.6 REC FILM ILLUM, CLOCK 0.6 I I I 0 0 VOLTAGE. 208/ 1 ph. 2 wire I y BUS 30A 2P MAIN BREAKER KAIC TRIP 30A TRIP LOAD RATING RATING KVA TYPE DESCRIPTION 2U/ 2 1 j 2 20/ 2 I 0.7 REC 2 2 2012 3 4 20/ 2 0.7 LTS CORD DROP SURGERY 2 2 20/ 2 5 6 20/ 2 0.4 REC FILM ILLUM, CLOCK 2 2 20/ 2 7 d 8 20/ 2 0.4 REC RIM ILLUM, CLOCK 2 2 9 f 10 11 13 15 17 19 LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.7 125% 0.9 REC 1st. 4.0 100% 1st. 4.0 REC 50% EXISTING PANEL FOR REFERENCE ONLY HVAC 100% PANEL TO BE DELETED KIT 100% SEE PLANS FOR CIRCUIT RELOCATIONS CIRCUIT BREAKER CODE S. LTS 100% G GFCI H HID RATED EQUIP 100% S SHUNT TRIP D SWITCHING DUTY MISC 100% 1FED FROM I II DOWNSTREAM LOAD INFORMATION TOTAL 4.7 104% 4.9 FEEDER LENGTH: I I REV' FEED THRU LUGS FEEDER: I I DATE. DOUBLE LUGS NOTES: 12 14 16 18 20 CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 2.3 104% 2.4 12 B: 2.3 104% 2.4 12 NEC TOTAL. 4.681 1 4.91 23 OLYMPIC MEMORIAL HOSPITAL 16660 APPENDIX 7!41/87 ISOLATED POWER PANEL SCHEDULE NAME. OR4 EXISTING LOCATION: SURGERY CORRIDOR CLOSET TYPE REC REC REC FILM ILLUM, CLOCK REC FILM ILLUM, CLOCK DESCRIPTION LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.7 125% 0.9 REC 1st. 4.0 100% 1st. 4.0 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FED FROM: TOTAL 4.7 104% 4.9 FEEDER LENGTH: FEEDER: OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD TRIP 30A KVA RATING 0.7 20/ 2 1 2 0.7 20/ 2 3 2 0.6 20/2 5 2 0.6 20/2 7 2 9 11 13 15 17 19 0 0 I NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS 16660 APPENDIX 20 VOLTAGE. BUS 208/ 1 ph. 30A 2P MAIN BREAKER TRIP LOAD RATING KVA TYPE DESCRIPTION 2 20/2 0.7 REC 2 4 20/ 2 0.7 LTS CORD DROP SURGERY 2 6 20/ 2 0.4 REC FILM ILLUM, CLOCK 2 8 2012 0.4 REC FILM ILLUM, CLOCK 2 10 12 14 16 18 SPARLING, INC 2 wire CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 2.3 104% 2.4 12 B: 2.3 104% 2.4 12 NEC TOTAL. I 4.681 1 4.91 23 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY DOWNSTREAM LOAD INFORMATION REV' FEED THRU LUGS I I DATE. DOUBLE LUGS I I KAIC 7/21/97 1/0 Wit Imi alli ie /OW Mk MR all MO i, mil NW Mil ft MI 111•1 aft o 11111 tar 4sIt tim cm AIM tiEl M IIIIII 'ISOLATED POWER PANEL SCHEDULE INAME OR5 EXISTING 'LOCATION: SURGERY CORRIDOR CLOSET TYPE IREC 1 REC DESCRIPTION REC FILM ILLUM, CLOCK REC FILM ILLUM, CLOCK OLYMPIC MEMORIAL HOSPITAL ROOM# LOAD TRIP I 30A KVA RATING 0.7 20/2 1 2 0 7 20/ 2 3 2 0.6 20/ 2 5 2 0.6 20/ 2 7 2 9 11 13 15 17 19 J 0 0 VOLTAGE. 2081 I 1 BUS 30A 2P MAIN BREAKER KAIC NOTES: EXISTING PANEL FOR REFERENCE ONLY PANEL TO BE DELETED SEE PLANS FOR CIRCUIT RELOCATIONS TRIP RATING 2 4 20/ 2 2 6 20/ 2 2 8 20/ 2 2 10 12 14 16 18 20 20/2 I 2I LOAD KVA TYPE 0.7 I REC 0.7 0.4 0.4 DESCRIPTION LTS CORD DROP SURGERY REC FILM ILLUM, CLOCK REC FILM ILLUM; CLOCK SPARLING, INC 1 Ph 2 wire LOAD CONN. NEC CALCULATED NEC CALC. TYPE (KVA) FACTOR LOAD (KVA) LTS 0.7 125% 0.9 REC 1st. 4.0 100% 1st. 4.0 REC 50% HVAC 100% KIT 100% S. LTS 100% EQUIP 100% MISC 100% FED FROM: I DOWNSTREAM LOAD INFORMATION TOTAL 4.7 104% 4.9 FEEDER LENGTH: I I REV' FEED THRU LUGS FEEDER: I I DATE. DOUBLE LUGS I CONN. NEC NEC LOAD NEC PHASE (KVA) FACT (KVA) AMPS A: 2.3 104% 2.4 12 B: 2.3 104% 2.4 12 NEC TOTA L. I 4.681 1 4.91 23 CIRCUIT BREAKER CODE G GFCI H HID RATED S SHUNT TRIP D SWITCHING DUTY 16660 APPENDIX 7/21197 1 9 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Provide and test equipotential grounding system in all patient care areas including but not limited to Operating Rooms, Recovery and Pre-op Patient Areas, Patient rooms, exam rooms, nurseries and treatment looms. Although such work (ground wires, raceways, etc.) is not specifically shown or specified, furnish and install all, supplementary or miscellaneous items, appurtenances and devices incidental to or necessary for a sound, secure and complete installation. 1.2 RELATED WORK SPECIFIED ELSEWHERE Raceways, Section 16110 Wires and Cables, Section 16120 Outlet and Pull Boxes, Section 16130 Isolated Power System, Section 16660 1.3 QUALITY ASSURANCE Codes and Standards: Refer to Section 16010 General Requirements, for applicable codes, system shall meet all requirements of NFPA 99 Chapters 3 and 7 and NFPA 70 (NEC) Section 517 for Patient Care Areas. 1.4 ELECTRICAL EQUIPMENT MAINTENANCE MANUAL Manual shall include the reports of the tests required under this section. PART 2 PRODUCTS 2.1 GROUND WIRES As specified in Section 16120 PART 3 INSTALLATION 3.1 DEFINITIONS For the purpose of satisfying the requirements of this section, NFPA 99:3 -5.2.1 and NEC Article 517 19 the "reference grounding point' shall be the equipment grounding bus in the isolated power panelboard or a grounding point in the patient care area under test that is electrically remote from the receptacles, or the grounding contact of a receptacle that is powered from a different branch circuit than the receptacle under test. The "Patient Vicinity" is the space not less than 6' beyond the perimeter of the bed or operating table and extending vertically not less than 7'-6 above the floor The 'Patient Care Area' is any portion of the hospital where in patients are intended to be examined or treated. See NEC Article 517 -3 for further definitions. 3.2 TESTING SECTION 16670 PAGE 1 EQUIPOTENTIAL GROUNDING SYSTEM A. Test Equipment. Voltage measurements shall be made with an instrument having an input resistance of 1000 ohms +1- 10 percent at frequencies of 1000 Hz or less. B Testing Procedure: After the rooms are finished and all devices are installed the following tests shall be performed. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16670 PAGE 2 EQUIPOTENTIAL GROUNDING SYSTEM 1 Potential difference between the reference grounding point and exposed conductive surfaces (including ground contacts of receptacles) in the patient vicinity Correct bonding of any items with a reading over 20 millivolts. 2. Impedance between the reference point and the grounding contact of each receptacle in the patient vicinity Correct grounding of any circuits with a reading over 0 1 ohms. 3 Record all test values and include them in the maintenance manual information. C. Submit a copy of the test results to the Engineer no longer than one week after tests are completed along with a letter stating that the installed equipotential grounding meets the requirements of the plans and specifications. D In conjunction with these tests, the maintenance aspects and recommended testing procedures shall be explained to Owner's personnel. END OF SECTION 16670 1 t r 1 1 t 1 i 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Provide complete and fully operational signal and communication systems. Exception. Those systems designated as "Raceway" systems only 1.2 TO QUALIFY AS AN ACCEPTABLE SUPPLIER AND /OR SUBCONTRACTOR SECTION 16700 PAGE 1 COMMUNICATIONS For Sections 16701 through 16799 shall fulfill the following requirements: A. Have the ability to provide the systems indicated in the contract documents from the criteria contained in the specification and the information shown on the drawings. B Provide AHJ approved shop drawings which show complete system plan views indicating equipment layout, device layout, raceway routing and sizing, point -to -point wiring, termination and connection diagrams and wire numbers for all conductors and connections. C Prior to bid determine the complete system components required to conform with local code and AHJ requirements. Include the cost of all components to all contractors in bid price. D To have been in the business of installing and maintaining the specific type of system equipment under the present firm name for at least five years. E. To have been distributing and/or installing the specific brand and model line of system equipment for at least three years prior to the date on the contract documents. F To have the capability of dispatching a maintenance or repair truck with a qualified repairman to the job site within four (4) hours of a request for service on the equipment. 1.3 CONTRACT DRAWINGS The contract drawings indicate the general nature of the components required, but do not necessarily show all components required. The drawings are intended to aid the contractor and/or subcontractor and/or supplier in providing the complete systems required. Raceways, routing and wiring are not shown on the drawings. Contractor shall provide per system requirements and shop drawings. 1.4 RELEASE OF CADD FILES FOR SHOP DRAWINGS Contractor may request to utilize Sparling CADD files for assistance in producing shop drawings. Request shall be made by signing Sparling's Agreement for Release of CADD Files' letter and paying $80 00 to cover the cost of reproducing and delivering the files to the Contractor PART 2- PRODUCTS 2.1 GENERAL See individual Sections 16701 through 16799 2.2 WIRING Provide as specified herein before, except conductor size and type shall be as required to suit the system involved and shall conform with code and AHJ requirements. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 3- EXECUTION 3.1 SYSTEM SUPPLIER AND /OR SUBCONTRACTOR REQUIREMENTS A. Determine the complete system raceway wiring and outlet box requirements. B Provide and/or stipervise all wiring, wire terminations and connections. C. Provide and/or supervise all equipment installation. D Perform and/or supervise all testing during and after installation. E. Certify in writing to the Architect (copy to Engineer) at completion stating that system has been inspected, tested and is complete and fully operational in accordance with contract documents. SECTION 16700 PAGE 2 COMMUNICATIONS F Instruct and/or assist the Contractor in instructing the Owner's personnel in the operation and maintenance of the system. 3.2 WIRING Provide all wiring complete per system requirements, including 10% spare conductors not less than two (2). Install all conductors in raceway unless noted otherwise. Color code all junction boxes. Provide numbered wire markers on each terminal end of all wires, in accordance with shop drawings using permanent pressure sensitive or sleeve type markers. 3.3 0 M MANUAL A. Provide all information as required per Section 16010 B Include record drawings, letter of certification and test results. 3.4 INSTRUCTION Provide as required per Section 16010, and applicable specification sections. 3.5 RECORD DRAWINGS Provide per 16010 Record drawings shall clearly indicate: 1 Actual routing of all raceways, and location of all junction boxes. 2. Actual cable type, numbers and routing. 3 Actual system wiring diagrams, connection diagrams and interface of all components in the system. END OF SECTION 16700 Y 1 i v 1 t t t `1 i t s 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1- GENERAL 1.3 UNIT PRICES AND TECHNICAL BID PROPOSAL A. Provide unit prices to add/delete the following: Manual Pull Station 1.2 APPLICABLE PUBLICATIONS Provide the system in compliance with the following: A. NFPA Codes, Standards and Manuals (latest issue enforced) 72 National Fire Alarm Code 90A Air Conditioning Ventilating Systems (specifically Chapter 4 'Controls B Other Codes and Standards: WAC (Washington Administrative Code) 296-46 ADA (Americans. with Disability Act) SECTION 16721 PAGE 1 FIRE ALARM SYSTEM 1.1 DESCRIPTION A. Provide a complete, electrically supervised and fully operational multiplex, analog addressable, annunciated fire detection and alarm system. The hospital has two existing fire alarm systems (Edwards system installed in 1983 and a Notifier system installed in 1990). This project shall be an extension of the existing Notifier AM2020 fire alarm system. The fire alarm system shall fully comply with the local fire code currently enforced at the project location. If any conflict occurs between government adopted code rules and these contract documents, the codes are to govern. B Existing Building Fire Alarm System. Replace the portions of the existing Edwards fire alarm system located in the remodel area of the hospital. The work in the existing building consists of, but is not limited to, the following: 1 Removing existing smoke detectors, heat detectors, manual pull stations, horns, bells and chimes in the remodel area. 2. Replace all existing fire alarm wiring in remodel area with new wiring. Color code new wiring to match existing Notifier fire alarm system. 3 Provide new smoke detectors, duct smoke detectors, heat detectors, manual pull stations, fire alarm remote annunciators, fire alarm speakers and visual alarm lights as shown on plans. 4 Reconnect existing 24V and 120 volt magnetic door holders and connected to new doors holders. Local fire code, building code, mechanical code, electrical code rules and interpretations required by the Authority having jurisdiction. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16721 PAGE 2 FIRE ALARM SYSTEM Smoke Detector Duct Smoke Detector Heat Detector Fire Alarm Speaker Visual Alarm Light Monitor Point Control Point (control relay) Remote Indicating Light Fire Alarm Remote Annunciator (FARA) Unit prices shall include shop drawings, engineering, and any system programming or CPU device cards required for each device. B Technical Bid Proposal. The fire alarm system supplier shall submit with his bid a technical proposal of adequate depth to fully define the system offered. Data of a business nature is not required. Installer shall list references with telephone numbers for proof that he has had experience in installing fire alarm systems of this type. As a minimum, the technical proposal shall include the following: 1 Description of the configuration and operation of the proposed system. 2. Include catalog cut sheets or other descriptive material of major components. 3 A complete copy of the fire alarm system specification with each subparagraph noted with the comment, "compliance, deviation, or "alternate. a. By noting the term "compliance, it shall be understood that the manufacturer is in full compliance with the item specified and will provide exactly the same with no deviations. b. By noting the term "deviation, it shall be understood that the manufacturer prefers to provide a different component in lieu of that specified. Manufacturer shall indicate all deviations. c. By noting the term "Alternate," it shall be understood that the manufacturer proposes to provide the same operating function but prefers to do it in a different manner Any manufacturer proposes to provide. 4 Items specifically called for in this specification are to provide for specific performance and quality of components desired and shall not restrict any manufacturer from furnishing an equivalent product for the performance an operation intended as described above. Two copies of the technical proposal from the proposed fire alarm system supplier shall be submitted to the Owner at the time of or prior to the bid opening. 1.4 ADDITIONAL REQUIREMENTS A. Fire Alarm System Supplier and/or Subcontractor Requirements: i f MAHLUM NORDFORS McKINLEY GORDON SECTION 16721 PAGE 3 OLYMPIC MEMORIAL HOSPITAL FIRE ALARM SYSTEM 2MAIN /SURGERY ADDITIONS ALTERATIONS 1 The fire alarm system subcontractor shall coordinate the installation of the fire alarm system including the preparation of shop drawings and submittals to the' Authority Having Jurisdiction" 2. The fire alarm subcontractor shall comply with the requirements of Section 16700 and prepare shop drawings in conformance with 16721, 1 10 3 Furnish and load all software required to implement a complete monitoring and control system. B Contractor Requirements: 1 Submit shop drawings to the "Authority Having Jurisdiction" (AHJ) as defined in NFPA 72. The AHJ for this project is the local Fire Marshal and the Washington State Fire Marshal. 2. One copy of the above shop drawings with this approval evidenced shall be included with the submittal required by Section 16100 3 Provide raceway back boxes, wiring, and power circuits for the fire alarm system, and install the devices ready for final termination at the transponders and Fire Alarm Panel by the Fire Alarm System Subcontractor Contact the fire alarm system subcontractor prior to bidding to determine exact requirements and include all costs in the bid price. 4 In addition, the contractor shall schedule periodic inspections by the AHJ during the course of the installation and shall make any minor corrections, deletions, relocations or additions to the system as required for acceptance of the completed system by the AHJ Contractor shall obtain and pay for all required permits. 5 Coordinate the interface requirements between mechanical control systems and the fire alarm system. 6 Performance Test: Final approval of the fire alarm system is contingent upon a successful performance test, accomplished by the installer and witnessed by the Fire Marshal. 1.5 GENERAL OPERATION A. The system shall be an extension of the existing solid state, microprocessor based system, using a true digital format between the Fire Alarm Control Panel (FACP) and each addressable device. System shall be able to communicate with a minimum of 99 addressable devices per pair of wires with any combination of smoke detectors, heat detectors, interface modules or manual pull stations. B The system transmission scheme shall provide for priorities of different types of alarm such that fire alarm points shall have the highest priority with other designated types of alarms having a second level of priority and the third level of priority shall be assigned to those monitoring points which do not require operator involvement. C. The FACP shall provide for a minimum of 990 monitor points and control points. System shall be able to have programmed Event Initiated Programs (EIPs). EIPs shall be initiated by any of the following user defined parameters: day time, alarm, return to normal, change of status, hardware failure, operator command. It shall also be possible to initiate EIPs manually from the operator's terminal. Any EIP shall be able to be initiated by any or all monitor points, and shall be able to operate any or all control points in the system. The system shall provide for multiple MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS levels of command priority to assure that high -level commands are not overridden by lower -level commands. 1.6 OPERATION OF FIRE ALARM SYSTEM A. The fire alarm system shall be, analog addressable, electrically supervised system. B. Operation of any initiation device shall immediately cause all of the following: 1 All fire alarm speakers to sound a continuous march time chime tone throughout the facility until silenced by a switch at the Fire Alarm Control Panel (FACP) or until the system is reset. Visual alarm lights throughout shall flash repetitively until the system is reset. 2. Auxiliary controlled devices shall operate until the alarm condition is corrected and the system reset. Magnetic door holders shall release doors, door operators shall closed fire doors and smoke dampers shall be closed. 3 Full English language annunciation of the alarm condition, type and location at the FACP display CRT and printer An audible signal shall sound and the alarm condition shall flash on the FACP display and CRT until acknowledged. Emergency instructions shall be displayed in English for the operator 4 Printout in full English language of the alarm condition, type and location plus time and date. All fire alarm initiated event commands shall be recorded automatically 5 Automatically transmit a general alarm and common trouble alarm to the local Fire Department via the Owner's monitoring company 6 Display on the Graphic Annunciator, the area and type of device in alarm. Remote annunciators at nurse stations shall illuminate when the alarm is in the same area as the nurse station. 7 Initiate the starting of the Elevator Shaft and Stairwell Pressurization Fans. C. Air handling equipment to be automatically shutdown only when activated by the smoke detector located in the supply air duct downstream of the filters. Both the supply fan and its related exhaust fan shall be shut down by the same sensor D The system, including annunciation, and remote annunciation shall be completely supervised to sound an audible and visual trouble signal upon the occurrence of any open or grounded circuits except that auxiliary control circuits (door holders, and fan shutdown) and smoke detector remote indicator lights need not be supervised. An open' or grounded zone circuit or annunciator circuit shall illuminate the trouble lamp and sound the trouble alarm at the control panel. E. Sprinkler System Monitoring SECTION 16721 PAGE 4 FIRE ALARM SYSTEM Coordinate the Fire Alarm System with the Sprinkler System to provide circuits for detection and annunciation as required by the AHJ to supervise any new valve(s) provided as part of the remodel. Provide circuits for detection and annunciation for any new water flow switches. Each water flow device and its associated valve position switch shall have their own address. Activation of any tamper switch shall activate the system supervisory trouble light. Differentiation between valve tamper switch and open/or grounds in the initiation circuit wiring shall be provided. A t 1 t i f 1 i t MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS F Elevator Capture. Provide control circuit from the fire alarm system to new Elevator Controller to recall elevator to the basement floor upon initiation to any fire alarm zone in the Building. Provide circuitry to the elevator controller to indicate when an alarm has been initiated by the basement floor elevator lobby smoke detector to prevent elevator from being recalled to that floor. Provide circuitry to shut down power to elevator prior to sprinkler activation. Coordinate exact circuitry required with elevator subcontractor 1.7 ANALOG ADJUSTABLE DETECTORS Education (existing zone) Emergency (existing zone) Lobby /Admitting (existing zone) Laboratory (existing zone) SECTION 16721 PAGE 5 FIRE ALARM SYSTEM A. Smoke Detectors 1 Shall communicate actual smoke chamber values to the FACP Adjustable sensitivity of the detector from the control panel shall be possible through software control. 2. A dirty trouble condition shall be reported any time the average value of a detector reaches a preset value. Any time the sensor can no longer compensate for the environmental conditions to maintain its set sensitivity an excessive dirty trouble condition shall be reported. B Heat Detectors 1 Shall sense within a temperature range of 30oF to 150oF The control panel shall be capable of sensing either a set point of 135oF or a rate of rise of either 15oF or 20oF per minute for fire sensing. 2. A set point shall be able to be chosen within the stated temperature range and the control panel programmed to use this information to determine a specific response such as a warning of the failure of the local temperature controls. C. Sensitivity adjustments shall be capable via seven day time controlled day /night operating mode. D Automatic daily sensor alarm simulation test meeting requirements of NFPA 72E and JCAH testing requirements for sensitivity levels shall be provided. 1.8 OPERATION OF MONITORING SYSTEM A. Monitoring alarms shall be a third priority to any and all fire alarms or security alarms. B The cause and location of the alarm shall be displayed at all CRT's and printers. C. The operator shall be able to program enabling and disabling of any individual monitoring point for specific time periods of the day or week. 1.9 FIRE ALARM ZONES A. The system main geographical zoning for the graphic annunciator shall be by department as follows: MAHLUM NORDFORS McIQNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1.10 DESIGN, SHOP DRAWINGS AND SUBMITTALS A. Contractor Design B Evacuation Alarm Sound Level C. Submittals Submit product data per Section 16100 Include the following information. Fire Alarm Control Panel (indicating any required modifications to existing). Transponders Point Schedule Transmission Cable Software Documentation (indicating any required modifications to existing) Equipment Documentation Terminal Cabinets Battery Capacity Calculations (for modified system) Conductors SECTION 16721 PAGE 6 FIRE ALARM SYSTEM Short Stay Unit (existing zone) Radiology (existing zone) Surgery 2 Main B Within each of the above zones provide individual addresses and annunciation for each device. C Provide circuitry for smoke door magnetic door holders and combination door holders/closers specified under division 8. Provide "single" zone circuitry so that all door release mechanisms in building release upon any alarm. Raceways, routing and system wiring are not shown on the plans and shall be the responsibility of the fire alarm system supplier to design conduit routing and wiring and to show the same on the shop drawings. Existing fire alarm raceway and wiring is derived from record drawings and no guarantee is made as to their correctness. The contractor shall investigate the existing conduit routing and determine what is required to tie the existing fire alarm raceway system into the new fire alarm system. The number of fire alarm speakers shall be increased if required by the AHJ to meet the following: 'The decibel level reading in the most remote area shall not be less than 70 and at least 10 above the normal ambient noise level." 1 1 t MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16721 PAGE 7 FIRE ALARM SYSTEM Initiating Devices Alarm Devices (Audible and Visual) Fire Alarm Zone and Address Schedule including alphanumeric description for each existing and new monitor and control point. Remote LEDs Graphic annunciator shop drawings (showing modifications to existing graphic) D Shop Drawings 1 Riser Diagrams. Fire alarm supplier and/or subcontractor shall develop CAD based original mylar fire alarm riser diagram to show transponder locations, fire alarm zones and point to point wiring requirements. 2. Floor Plans. CAD based floor plans shall be drafted to show conduit routing, device locations, end of line resistors, wire count and color coded wiring between device locations on each plan. Show fire alarm zones, and room names and numbers for each room where a fire alarm device is located. 3 Main Graphic Annunciator Prepare a full size original mylar drawing showing building outline, type set messages lettering and numbers, trouble alarm locations and proposed colors. Drawing shall be approved prior to manufacture of annunciator panel faceplate. Drawing shall show modifications to existing annunciator graphic. 4 Ownership. All original shop drawings shall become the property of the owner at the completion of the project. E. Operations and Maintenance Manual PART 2 PRODUCTS 2.1 MANUFACTURER 2.2 WIRING Per Section 16010 2.3 ADDRESSABLE INITIATING DEVICES All equipment shall be the product of a single manufacturer except that certain individual components which are regularly used as part of the system may be the product of a separate manufacturer System shall be Underwriters Laboratories listed under Standard 864 UOJZ Proprietary Fire Management System. Approved manufacturers: Notifier, other separate components by Honeywell, Edwards System Technologies (EST) Simplex, Gamewell, Pyrotronics, or Thorn Autocall. UL listed conductors which conform to AHJ requirements. Subject to AHJ approval use No. 16 AWG (seven strand) for initiating circuits and No. 14 AWG (nineteen strand) for control and alarm circuits. Transmission cable shall be #18 AWG multiple twisted pair with overall shield. All initiating devices shall have all electronic components and address setting devices located in the base assembly or in the device. Removal of the device shall cause a trouble signal to be MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16721 PAGE 8 FIRE ALARM SYSTEM transmitted to the FACP indicating the address of the device in trouble. All devices shall be field programmable. If DIP switch switches are not utilized for programming addresses then the supplier shall provide a programmer as part of their bid. 2.4 FIRE ALARM CONTROL PANEL A. Shall be existing Notifier AM2020 Provide modifications and programming to existing FACP as required to support the fire alarm expansion. B. Alarm Verification. The activation of any system smoke detector shall initiate an Alarm Verification operation whereby the panel will reset the activated detector and wait for a second alarm activation. If, within one (1) minute after resetting, a second alarm is reported from the same or any other smoke detector the system shall process the alarm as described C. System Walk Test. Activation of any manual or automatic device shall cause the evacuation alarms to sound a coded "Test' chime tone (different than the actual evacuation alarm and different for each zone) without activating automatic notification, or auxiliary alarm outputs and will then automatically reset. Momentarily opening an initiating device circuit shall cause the evacuation alarms to operate for four (4) seconds for the purpose of testing electrical supervision of the initiating circuit. D Upgrade power supply and battery backup system as required to support any new components. Where smoke doors are released and duct dampers close under power failure conditions, they are not required to be maintained open during power failures after 15 minutes. Provide sufficient batteries to power the system for the hours required by the AHJ or two hours, whichever is larger E. Submittal shall indicate length batteries will power system. 2.5 TRANSPONDERS A. Provide transponders with intelligent/analog device 1/0 cards to interface between the FACP and the addressable devices. B. Each I/O card shall contain its own dedicated resident CPU and shall provide power process, store, control, and communicate with sensors and I/O modules via a minimum 18 -gauge twisted shielded pair C The I/O cards shall provide for sensitivity adjustment and alarm verification by point, process the analog values from all intelligent devices in its loop and determine normal, alarm, and trouble conditions. D Each addressable device on the loop must be uniquely identified by an address code entered on each device at time of installation. The use of jumpers to set addresses will not be acceptable. E. In the event of communications loss with the FACP the I/O card must be capable of reacting to all its connected input devices and applying its own stand -alone local mode programming instruction to determine the status of all its connected outputs. F Each transponder shall be provided with a maintenance free battery backup system sized for the hours required by the AHJ or two hours, whichever is longer r t 1 N 1 i 1 r e 1 t MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.6 AMPLIFIERS SECTION 16721 PAGE 9 FIRE ALARM SYSTEM A. Amplifiers and signalling circuitry shall provide amplification power of a minimum of one watt per speaker or more where required to maintain code required volume. Provide one backup amplifier The amplifier system shall provide full supervision of speaker, distribution and amplifier circuits. The frequency response shall be within 3 db from 100 to 4000 Hz with less than 5% total harmonic distortion at rated output. Amplifiers shall be sized for speakers (at 1 watt tap) that they serve. B An open circuit in any speaker coil shall not prevent the balance of the signals connected to that circuit from operating. Periodically during operation of a speaker circuit, the control equipment shall supervise the speaker circuit to detect wiring faults. If a short circuit is detected, the faulted circuit shall be automatically disconnected from the power amplifier to allow the balance of the connected circuits to operate, and trouble indicated. If the short circuit disappears, such a circuit shall be automatically reconnected for signalling purposes. 2.7 MANUAL STATIONS Manual stations shall be addressable, single action, mechanically latching non -coded type with tumbler type key operated test -reset lock. Mounting shall be semi -flush in all finished areas and may be surface mounted in unfinished areas. The station housing shall be fire red factory finish. Provide ten (10) keys which will initiate alarm at any station. 2.8 SMOKE DETECTORS A. Shall be addressable with adjustable sensitivity of the detector from the control panel through software, photoelectric type or as required by AHJ Provide detection sensitivity from 5% to 3 7% in 5% increments. Visual indication of normal and alarm/trouble shall be incorporated into the exposed surface of the device. Detector head shall be removable from the base and base shall accept photo electric, ionization or heat detector head. B All smoke detectors located where they are not visible when standing in the room (such as duct detectors located above the ceiling) shall be provided with a remote indicating light located in the ceiling below the device location. Remote indicating light shall be flush or semi -flush mounted with identifying engraved nameplate per 16100 indicating detector address and name i.e. AHU -5 smoke detector zone 12. C. All patient room smoke detectors shall be provided with auxiliary contacts for connection to the nurse call dome light. 2.9 HEAT DETECTORS The addressable heat detectors shall have a sensing range of 32oF to 158oF The FACP shall initiate an alarm at a set point of 135oF or a rate of rise of either 15oF or 20oF per minute. The detector shall be an off- white color with a low- profile (less than 1 1/2 silhouette to blend into ceiling decor Detector head shall be removable from base. 2.10 DUCT DETECTORS A. Heat Detectors: Shall contain two sets of contacts rated 10 amps resistive and shall have 50 -650 degrees F adjustment range. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 2.11 FIRE ALARM SPEAKERS 2.12 VISUAL ALARM LIGHTS 2.13 ANNUNCIATORS A. Modify existing remote annunciators where required by patient room revisions. B Coordinate patient room numbers to be used on annunciators with Owner 2.14 SMOKE DOOR RELEASE MECHANISMS SECTION 16721 PAGE 10 FIRE ALARM SYSTEM B Smoke Detectors: Shall be sampling ionization type for sensing of products of combustion within the air stream of ducted fan systems. The devices shall include necessary sampling tube extensions and sensitivity adjustments for detection of products of combustion across the width of the duct. The device shall function uniformly in air velocities of 500 feet per minute through 3000 fpm. Visual indication of normal and alarm/trouble shall be incorporated into the exposed surface of the device. Provide a remote indicator light as required in Part 3 of this Section. Provide auxiliary contacts for fan shutdown. C. Nameplates. Adjacent to each duct detector provide a nameplate per Section 16100 with 3/8 inch letters indicating load served and area served. Example: "AC -1 Surgery Air Conditioning Supply" A. Finished Areas: 4" diameter fire retardant, treated cone type, with line matching transformer for 1/4 1/2, and 1 watt output on a 25 or 70 7 volt line. Frequency range 400 -4000 Hz producing 87 db at 10 feet with 1 watt input. Speakers shall be UL listed for emergency alarm systems. Speaker grill shall be round steel or plastic screw retained with matte white painted finish. B Unfinished Areas: 4 treated paper cone type with power tap points at 1/4 1/2, 1 and 2 watts on a 25 watt on a 25 volt or 70 volt line. Surface mounted. Rated 88 db at 10 feet at 2 watts. C. Provide a speaker in each new elevator Coordinate wiring requirements with elevator subcontractor Visual alarm lights shall be a Xenon strobe, wall mounted with white housing and clear lens with "FIRE" printed vertically on the lens. Light intensity shall be 75 candela, with 0.2 second maximum pulse duration, flash rate of 1 to 1.5 flashes per second meeting ADA requirements. Provide 110 candela visual alarm lights, U.L. listed under Standard 1971 in sleeping rooms. A. Wall Mounted Magnetic Holder 120 volts, AC, release upon de- energization furnished under Division 8. B Combination Door Closer/Holder Furnished under Division 8, 120 volts AC, release upon de- energization. Electrical characteristics of door holder mechanisms shall be coordinated for proper operation of magnetic release from fire alarm system. Manual override release shall be possible at any time. C. Rolling Door Release Mechanisms. 120 volts AC, release upon de- energization furnished under Division 8 with built in time delay 1 1 1 1 1 i 1 1 1 I 1 1 t MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS 2.15 SPRINKLER FLOW SWITCH CONNECTION Where added as part of remodel, they shall be furnished and installed under Division 15 These units shall each have one set of normally closed contacts. Contractor shall furnish and install all conduit, wire and make connections as required to tie into the associated water flow zone of the fire alarm system. Contractor shall verify that sprinkler water flow indicators are equipped with pneumatic retard feature to prevent false alarms due to water pressure fluctuations. 2.16 SPRINKLER TAMPER SWITCH CONNECTION 2.17 REMOTE INDICATING LIGHT SECTION 16721 PAGE 11 FIRE ALARM SYSTEM Sprinkler system gate valves, tamper switches, having the required normally closed electrical contacts for trouble condition signal initiation shall be furnished and installed under Division 15 Contractor shall furnish and install all conduit and wire and make connections as required to tie into the water flow zone of the fire alarm system. Ceiling or wall mounted, single gang device with red LED light to flash whenever the associated smoke detector is in alarm. Provide remote indicating light for each non visible duct detector Provide remote indicating light for each Short Stay patient room smoke detector 2.18 SPARE COMPONENTS Furnish the Owner with the following spare components: Ouantitv 2 4 2 6 4 4 PART 3 INSTALLATION 3.1 APPROVED EQUIPMENT AND PERMIT Item Manual stations. Smoke Detectors of each type on project. Heat Detectors of each type on project. Smoke/heat detector bases. Fire Alarm Speakers Visual Alarm Lights. A. No equipment shall be delivered to the jobsite until shop drawings have been reviewed and AHJ approved. A reviewed and AHJ approved shop drawing set shall be continuously available at the jobsite during construction. B Obtain a permit from the local AHJ prior to installation of equipment as required. 3.2 CIRCUITRY A. All wiring shall be contained in steel raceways and red color junction boxes. Seal raceways to prevent air passage at each smoke detector Wiring insulation shall be one of the types required by NEC 725 -16 and shall be consistently color coded throughout the system. Permanent wire MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS markers shall be affixed to all conductors at terminations and splices. Numbering system shall be consistent with shop drawings. (Color schedule shall be reviewed by the Engineer prior to delivery of wire to the project.) All terminations shall be T&B "Sta -Kon" (or equivalent) self insulated, flanged or forked tongue lugs where connected at screw type terminals. Wiring in main control cabinet shall be neatly arranged and bundled with Tyraps (or equivalent). Number 16 gauge wire shall have a maximum of 7 strands. 3.3 AUXILIARY CONTROLS SECTION 16721 PAGE 12 FIRE ALARM SYSTEM Conductors and power supplies of sufficient size shall be installed to minimize voltage drop consistent with the proper operation of all devices. Destructible link smoke dampers shall not be connected to the fire alarm system. Fan Shutdown Control Circuits and Smoke Removal Circuits need not be electrically supervised (subject to NFPA 72 and 72E requirements) and may be incorporated into the fire alarm raceway system, except that limited energy circuits shall be routed separately from line voltage circuits as required by Code (NEC Article 725). 3.4 AIR DUCT HEAT AND SMOKE DETECTORS Conform with NFPA 90A Chapter 4 "Controls' Provide as required in the supply air streams in each system 2000 CFM or larger Coordinate installation with Divisions 15 and sheet -metal installer Provide remote indicator lights (for duct smoke detectors) where the detector is located above a suspended ceiling or in an area which is not readily accessible. 3.5 DEVICE LOCATIONS A. Device locations may be changed within 15 feet without extra charge, if so directed by the Engineer before installation. B Automatic Detectors: Locate not less than 2 feet from a supply or exhaust ventilation grill and not less than 18" from dead air spaces. C. Visual Alarm Lights: Locate 80" above floor or 6" below ceiling whichever is lower with a maximum of 100 foot between alarm lights. Locate in public areas and in each public bathroom. D Manual Stations: Locate at 48" AFF maximum if only front reachable, 54" AFF maximum if side reachable. 3.6 OPERATION AND MAINTENANCE MANUALS Provide per Section 16010 3.7 RECORD DRAWINGS A. Provide per Section 16010 As -built drawings shall clearly indicate: 1 Actual routing of all raceways. 2. Actual cable type, numbers and routing. 3 Actual system wiring diagrams, connection diagrams and interface of all components in the system. 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McICNLEY'GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.8 EXISTING SYSTEMS 3.9 TESTING SECTION 16721 PAGE 13 FIRE ALARM SYSTEM A. The Hospital shall be continuously provided with an operational fire alarm system at least equivalent to the existing system (unless otherwise permitted by the Authority having jurisdiction) throughout the construction period. Any shutdowns shall be scheduled two days in advance with Hospital Engineer B. All existing panels, and devices no longer in service as a result of this contract shall be removed. Unused flush mounted devices, outlet and other boxes in finished areas shall be provided with blank coverplates. A. Each wing of the new Fire Alarm System shall be tested using the following procedure. Special equipment required for testing ionization detectors and/or heat detectors where installed shall be provided by Contractor at time of test. 1 Device Tests. Within each wing of the building the Contractor shall connect all signal and initiating devices in the zone to the fire alarm control panel. All smoke detectors, and all other devices shall each be tested for proper operation. 2. Operation of all features of the systems under normal operation. 3 Operation of all supervisory features of the systems. 4 Operation of all features of the systems on generator power and battery power with primary power off. 5 Operation of each alarm and command function. 6 AHJ Inspection. After zone testing has been satisfactorily performed, the complete system shall be operated on -line' for one week (minimum). The complete system shall then be demonstrated to operate satisfactorily in the presence of the Engineer and the Authority having jurisdiction. Approval of the Authority having jurisdiction shall be evidenced in writing. The Contractor shall include in his bid one day with two men available for each wing's AHJ inspection. 3.10 FINAL OPERATIONAL ACCEPTANCE TEST A. A final operational test of not less than thirty (30) consecutive days, twenty -four (24) hours per day shall be conducted on the complete and totally installed and operational Fire Alarm System to demonstrate that it is functioning properly in accordance with all requirements of this specification. The correct operation of all monitored and controlled points shall be demonstrated as well as the operation and capabilities of all sequences, reports, diagnostics and all other software. If the equipment operates at an average effectiveness level (AEL) of at least (95 during the performance test period of thirty (30) consecutive calendar days, it will be deemed to have met this Standard of Performance, and final acceptance of the system shall be made, provided the contractor has satisfied all other requirements of this specification. In the event the required AEL is not reached during the initial thirty (30) consecutive calendar day period, the final operational acceptance test period shall be extended on a day to-day basis until the required AEL is reach for thirty (30) consecutive calendar days. The average effectiveness level (AEL) is defined as the ratio between the total thirty-day test period less any system downtime accumulated within that period, and the thirty-day period. Downtime shall result whenever the MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16721 PAGE 14 FIRE ALARM SYSTEM fire alarm system is unable to fulfill all required functions detailed within this specification due to any malfunction of either hardware or software. Any defect of hardware or software shall be corrected when it occurs before the test may be resumed. System downtime for each incident shall be measured by those intervals during the performance period between the time the system is returned to proper operating condition. Downtime of the system resulting from the causes as follows will not be considered as system failures: 1 Downtime resulting from an outage of the main power supply in excess of the capability of any backup power source(s), provided that the automatic initiation of all backup sources was accomplished and provided that the automatic shutdown and restart of components fulfills the requirements of this specification. 2. A functional failure resulting from an individual sensor or Transponder provided that the system recorded the fault and the AEL of the total of sensors and Transponders is at least (95 during the thirty-day test period. 3.11 INSTRUCTION The Contractor shall (after one week (minimum) written notification to Architect) conduct an instruction session during which all maintenance and operational aspects of the system will be described and demonstrated to personnel selected by the Owner The session shall be conducted by a Fire Alarm Supplier's representative thoroughly familiar with the characteristics of the system. 0 M manual information regarding the system shall be turned over to the Architect prior to scheduling the instruction session. END OF SECTION 16721 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Provide data per Section 16100 SECTION 16724 PAGE 1 SMOKE DAMPER CONTROL A. General. Provide wiring and relays to control smoke dampers provided by Division 15 B Contractor Design. Raceways, routing, and wiring is not shown on the drawings. Contractor shall be the responsible for design of conduit routing and wiring and to show the same on shop drawings. System shall be in steel raceways. Circuits shall be Class B. Power smoke dampers from an emergency power circuit. 1.2 SUBMITTALS B Shop Drawings: 1 Reproducibles: Contractor shall pay a Seattle located reprographic company for having a set of erasable mylars made of the contract drawings, including floor plans and risers. Contact engineer to arrange for printing. 2. Floor Plans: Floor Plans shall be marked up showing conduit, routing, device locations, wire count, and color coded wiring between device locations on each plan. 3 Detail Plans: In addition to the contract set of sepias, Contractor shall prepare original mylar drawings showing termination and connection diagrams at relays. PART 2 PRODUCTS 2.1 SMOKE DAMPERS Electrically operated, single phase, 120 volt, two position. Dampers close upon de- energization. Provided by Division 15 2.2 CONTROL RELAYS Heavy duty plug -in relay contacts twice the rating of circuit requirements, temperature range -45 degrees to +70 degrees C. Enclosure: Sealed heat and shock resistant, rated for 2.5 million mechanical operations, 100 000 electrical operations. 2.3 NAMEPLATES Provide nameplate per Section 16100 with 118" lettering on each relay "SMOKE DAMPERS. PART 3 EXECUTION 3.1 CONTROL SEQUENCE Provide a relay for closure of smoke dampers connected to fire alarm panel alarm output signal. Operation shall be as follows: When any smoke is detected in adjacent smoke compartments by room smoke detectors, smoke dampers shall immediately close. MABLUM NORDFORS MCKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 TESTING SECTION 16724 PAGE 2 SMOKE DAMPER CONTROL Each fan and its smoke dampers shall be tested using the following procedure. When signal is sent from fire alarm panel, each damper shall be visually inspected to insure that it is closed. Submit test results. END OF SECTION 16724 t 1 i 1 t 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16731 PAGE 1 ELAPSED TIME CLOCKS PART 1 GENERAL 1.1 DESCRIPTION Furnish and install elapsed time clocks in the surgery department in the locations shown on the drawings. PART 2 PRODUCTS 2.1 ELAPSED TIME CLOCK Digital readout with one inch high LED Arabic numerals, 120 volt. The elapsed time clock shall be capable of being stopped and restarted without being reset. 2.2 REMOTE CONTROL UNIT Remote control unit to include start button, stop button and reset button. 2.3 FACEPLATES High impact resistant, non conductive, flame retardant plastic material. 2.4 MANUFACTURER Dukane Model 24A720 clock with 9A1840 remote control unit or other approved manufacturer PART 3 EXECUTION 3.1 BACKBOX Provide backbox as recommended by manufacturer Locate elapsed time clock and control unit indicated on architectural elevations. END OF SECTION 16731 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION PART 2 PRODUCTS 2.3 SECONDARY CLOCKS SECTION 16732 PAGE 1 CLOCK SYSTEM Provide a synchronous wired clock system complete with microprocessor controlled master clock, all secondary clocks, all required backboxes and accessories necessary for a complete installation. Provide battery operated clocks in the locations shown on the drawings. 1.2 SUPPLIER AND /OR SUBCONTRACTOR Clock equipment supplier and/or subcontractor shall comply with the requirements of Section 16700 1.3 OPERATION All secondary clocks shall be operated by individual synchronous motors and they shall be automatically tested once each hour for exact minute and second synchronism and once each twelve hours for exact hour synchronism with the master time. Any individual clock or clocks found to be not in exact agreement with the master time shall be automatically corrected. Hourly correction range shall be 59 minutes slow and 55 seconds fast. 2.1 MANUFACTURER A. Master Clock Controller Dukane Model 24A700 or Simplex Accumaster or Rauland 2424 are acceptable. Other manufacturers must obtain approval prior to bid. B Secondary Clocks: Simplex, Standard Time, Edwards, Dukane, Rauland, or Cincinatti are acceptable. C. All equipment shall be the product of a single supplier who maintains full responsibility for all equipment. D Dukane numbers used for illustration unless noted otherwise. 2.2 MASTER TIME PROGRAM CONTROL The master time and program control shall be similar to Dukane Type 24A700 modular design, solid state, digital type. This unit shall be microprocessor controlled with electrically alterable memory information storage. Loss of 120 volt power or battery power will not cause loss of system memory It shall be possible to establish or change the master time and program schedules at the master time program control unit without special tools or instruments and without removing any part of the unit form the premises. Unit to include a switch for changing to daylight savings time. This unit shall be rack or shelf mounted with rack or shelf provided by system supplier The face of the unit shall include the required keyboard, plug -in modules, switches, manual/automatic function LED's and a digital readout to indicate hours, minutes, seconds, day of week or holiday A. Clocks shall be 120 Volt, 60 Hertz, synchronous motor operated, automatically regulated type, equipped for automatic one and twelve hour individual and group time supervision and regulation. All clocks shall be furnished with required backbox for clock. Each clock shall be equipped with a dust cover for the mechanism and with flexible four wire cord and connector Clocks shall have 12" square metal cases with satin aluminum finish, aluminum dials, black hour and minute hands and red sweep second hand and be semi -flush mounted. Dukane 24060 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.2 WIRING SECTION 16732 PAGE 2 CLOCK SYSTEM B. Flush wall boxes for separately mounted clocks shall be supplied by manufacturer Each clock box shall include depth adjustable hanger and four wire equipment ground type receptacle. 2.4 NAMEPLATE Provide nameplate per Section 16100 with 1/8' letters on master control Label `Master Clock Control' 2.5 SHOP DRAWINGS Prepare and submit for review prior to manufacture. Shall include complete floor plans of system layout showing raceway routing, required boxes wiring and connection diagrams. PART 3 EXECUTION 3.1 GENERAL Conform with the requirements of Section 16700 Provide all wiring contained in raceway separate from other systems. Raceway is not shown on the drawings. Raceways shall be provided as required. All cable terminations at master clock shall be tagged as to junction and destination and shall be segregated and neatly laced. Provide minimum of one 3/4" homerun per fifteen clocks. Provide all required wiring. Required wiring is not shown on the drawings. All wiring shall be color coded throughout. Clock wiring shall be 3#14 (larger if required) common to all clocks. 3.3 ACCEPTANCE TESTS On completion of the installation of the system, the Supplier /Contractor providing this equipment shall provide a qualified technician to perform the following tests: A. The overall system shall be tested free and clear of open's, grounds and crosses between conductors to all clocks in the system. The system shall deliver the minimum signal level required for proper operation at each outlet. B A certification shall be made to the fact that the system is 100% operational and no conditions are present in the system which would affect any of the system operations. C. The Architect shall be notified forty-eight hours prior to testing so that he may at his discretion notify owner representatives to witness the test procedure and results. D A report of the testing together with certification of operation shall be submitted on all the above required data, prior to final acceptance. Copies shall be included in the 0 M manuals. 3.4 INSTRUCTION The Contractor shall (after one week (minimum) written notification to the Architect) conduct a 2 hour instruction session during which all maintenance and operational aspects of the system will be described and demonstrated to personnel selected by the Owner The session shall be conducted by a contractor's and supplier's representative thoroughly familiar with the characteristics of the system. 0 M manual information regarding the system shall be turned over to the Architect prior to scheduling the instruction session. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.5 OPERATION AND MAINTENANCE MANUALS Provide per Section 16010 3.6 AS -BUILT DRAWINGS SECTION 16732 PAGE 3 CLOCK SYSTEM The Ownet shall be provided with as -built drawings, included in the 0 M manuals, which shall indicate: 1 Actual routing of all raceways. 2. Actual cable types and routing. 3 Actual system wiring diagrams, connection diagrams, and interface of all components in the system. END OF SECTION 16732 1 1 1 1 1 1 1 r i i 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION SECTION 16740 PAGE 1 TELEPHONE, COMPUTER RACEWAY SYSTEMS A. Provide raceway systems for the installation of the telephone equipment and/or computer wiring. Installation shall include raceways, outlet boxes, plaster rings, and outlet box cover plates. B Provide a raceway from each telephone and computer outlet to an accessible ceiling space on the same floor as the outlet. C Provide raceway sleeves through all fire and smoke separation walls including sleeves at each patient room into corridor Install fire stopping after installation of telephone, computer cables is complete. D Provide raceways to outlets located in fixed casework. PART 2 PRODUCTS 2.1 WALL OUTLETS Shall consist of a 4" square, 2 gang, 2 1/2" (minimum) deep box with 3/4" single device plaster ring. Surface wall outlets shall be 4" square, 2 gang, 2 3/4 (minimum) and shall match and be manufactured by the metal surface raceway manufacturer 2.2 PULL WIRE Shall be plastic having not less than 200 pound tensile strength. 2.3 PLATES Provide by others. 2.4 CONDUCTORS Provided by others. PART 3- EXECUTION 3.1 RACEWAYS A. Shall conform to specification sections "Raceways' and "Outlet, Junction and Pull Boxes" with the additional requirement that no length of run shall exceed 150 feet and shall not contain more than two 90- degree bends or the equivalent without a code size pull box. Provide pull or junction boxes where necessary to comply with these requirements. Inside radii of bends in raceways one -inch trade size. and larger shall be not less than two times the nominal diameter B Provide individual conduit per box. Raceways and raceway sleeves shall be 3/4 minimum. 3.2 PULL CORDS Nylon type, shall be included in all raceways over 10 feet long. Leave not less than 12 inches of slack at each end of the pull wire. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS 3.3 REMODEL SPACES SECTION 16740 PAGE 2 TELEPHONE, COMPUTER RACEWAY SYSTEMS A. Remove `out of service' telephone and computer conductors and conduits that serve spaces remodeled, only after receiving approval from the owner B. Notify owner in writing when inservice telephone and computer conductors are serving occupied spaces and must be reldcated. The owner shall relocate existing conductors that are to remain in service except as indicated. END OF SECTION 16740 1 1 i 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Furnish all equipment, accessories, and material required for the installation of a Nurse/Patient Communication System in accordance with the specifications and drawings. Any material and/or equipment necessary for the proper operation of the system not specified or described herein shall be deemed part of this specification. Work indicated in the Short Stay Unit and 1 West shall be an extension of the existing Rauland III nurse call system in the unit. A complete, new nurse call systems shall be provided for the Surgery Unit and 2 Main Unit. The existing system at the 2 West unit shall be replaced to provide a single system covering both the 2 Main and 2 West Units. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Raceways, Section 16110 B. Outlet and Pull Boxes, Section 16130 C. Communications, Section 16700 1.3 CODES AND STANDARDS Refer to Section 16010 General Requirements, for applicable codes. All components and the system as a whole shall be listed under U.L. 1069 1.4 SUBMITTALS SECTION 16750 PAGE 1 NURSE CALL SYSTEMS A. Product Data. Assemble in submittal brochure as specified in Section 16100 B Shop Drawings: 1 Reproducibles: Contractor shall pay a Seattle located reprographic company for having a set of erasable mylars made of the contract drawings including floor plans and risers. Contact engineer to arrange for printing. 2. Floor Plans: Mylar floor plan shop drawings shall show conduit routing, device locations, wire count and color coded wiring between device locations on each plan. 3 Detail Plans: In addition to the contract set of floor plan drawings, the Contractor shall prepare original mylar drawings showing termination and connection diagrams including wire numbers and front view of annunciators. Messages on annunciator shall be clearly indicated together with letter size on the shop drawings. C. Operations and Maintenance Manual. Per Section 16010 1.5 COORDINATION Contractor shall coordinate outlet box requirements with system supplier Notify Architect prior to installation if conflicts occur between required box depth and wall thickness. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1.6 SYSTEM OPERATION AUDIO/VISUAL SYSTEMS A. General. SECTION 16750 PAGE 2 NURSE CALL SYSTEMS Each audiovisual nurse call system shall consist of microcomputer controlled equipment utilizing stored program software providing maximum flexibility for station number assignments, call priority levels and future expansion. Each system shall provide audible signaling, visual annunciation, patient to staff communication, staff to staff communication and intercommunication between Master Station Annunciators. B Call Priority 1 Seven distinct call priority levels shall be provided as follows: Priority Dome Light Annunciation Call Tvoe Level Indication Rate Surgery Code Blue 1 Flashing Red 120 PPM Code Blue 2 Flashing Red 120 PPM Nurse Assist 3 Flashing Green 60 PPM Toilet Emergency 4 Flashing Red 60 PPM Patient -Priority Call 5 Flashing White 60 PPM Patient Normal Call 6 Steady White 6 PPM Staff Call 7 6 PPM Tone rate (pulses per minute) annunciated at the Master Station Annunciator and all Duty Stations associated with the System. 2. Call priority for extension of existing systems shall match existing. C. PATIENT BEDSIDE CALL A patient shall originate a call on the system by depressing a button on the Pillow The type of call that is placed on the system shall be determined by how the patient station is programmed from the Master Station (either normal (6) or priority (5)). These calls shall perform the following functions: 1 Normal Call (Priority Level 6) a. Illuminate the white call indicator lamp on the Patient Station. b Continuously illuminate the white section of the Corridor Dome Light. c. Illuminate the patient call light and sound a tone (6 ppm) at all Duty Stations. d. Identify the patient's room number bed number call priority status (6) and sound a tone (6 ppm) at the Master Station Annunciator MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS SECTION 16750 PAGE 3 NURSE CALL SYSTEMS 2. Priority Patient Call (Priority Level 5) a. Illuminate the white call indicator lamp on the Patient Station. b. Flash the white section of the Corridor Dome at 60 ppm. c. Flash the patient call light and sound a tone (60 ppm) at all Duty Stations. d. Flash the patient's room number, bed number, call priority status (5) and sound a tone (60 ppm) at the Master Station Annunciator e. Priority Patient Calls shall only be cancelable at the Patient Bed Station. 3 Voice communication shall be established upon answer of the call at the Master Station. When the call is answered, all previously illuminated lights are extinguished and the red privacy light on the Patient Station is illuminated. If a call cord is removed for whatever reason from a Patient Station, a Priority Patient call shall automatically be initiated. This call cannot be canceled at the Master Station or by depressing the red cancel button on the Patient Station until the call cord is reinserted into the receptacle of the Patient Station. 4 A combination call cancel/privacy button shall be provided. When this button is depressed while the station is idle the red indicator light shall flash and conversation within the room cannot be monitored. When the privacy switch is activated the Master Station shall be able to speak to the bed station and the switch shall not interfere with the placement of a call to the Master Station. D PATIENT EMERGENCY CALL (TOILET EMERGENCY STATION) A patient shall originate an emergency call on the system by pulling a cord on the toilet emergency station. The call shall hold until answered at the originating station by depressing the reset switch/call assurance light. Originating a call from these stations shall. 1 Flash the call assurance lamp in the Toilet Station at 60 ppm. 2. Flash the red section of the Corridor Dome at 60 ppm. 3 Flash the bath call light and sound a tone (60 ppm) at all Duty Stations. 4 Flash the patient's room number, call priority status (4) and sound a tone (60 ppm) at the Master Station Annunciator No voice communication to the nurses station will be possible. E. NURSE ASSIST BUTTON (MEDICAL EMERGENCY SIGNAL) A staff member can initiate a nurse assist call from a Nurse Assist station by depressing a large red button. The call shall hold until answered at the originating station by depressing the reset switch/call assurance light. Originating a call from these stations shall. 1 Flash the call assurance lamp in the Nurse Assist Station at 60 ppm. 2. Flash the green section of the Corridor Dome at 60 ppm. 3 Flash the emergency call light and sound a tone (60 ppm) at all Duty Stations. 4 Flash the patient's room number, bed number, call priority status (3) and sound a tone (60 ppm) at the Master Station Annunciator MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS F SURGERY INTRA- DEPARTMENT CODE BLUE BUTTON G CODE BLUE BUTTON H. STAFF STATION SECTION 16750 PAGE 4 NURSE CALL SYSTEMS A staff member can initiate an intra department Code Blue call from a Surgery Code Blue Station by *pressing a large blue button. The call shall hold until answered at the originating station by depressing the reset switch/call assurance light. Originating a call from these stations shall. 1 Flash the call assurance lamp in the Surgery. Code Blue Station at 120 ppm. 2. Flash the red section of the Corridor Dome at 120 ppm. 3 Flash the code call light and sound a tone (120 ppm) at all Duty Stations. 4 Flash the patient's room number bed number call priority status (1) and sound a tone (120 ppm) at the Master Station Annunciator 5 Flash the corresponding station annunciator lamp and sound a tone (120 ppm) on a modified section of the existing Code Blue Annunciator located adjacent to the telephone switchboard. Two way voice communication will not be possible between the Code Blue Station and the annunciator at the telephone switchboard. The PBX operator will then announce the code blue via the public address system in the surgery area only A staff member can initiate a Code Blue call from a Code Blue Station by depressing a large blue button. The call shall hold until answered at the originating station by depressing the reset switch/call assurance light. Originating a call from these stations shall. 1 Flash the call assurance lamp in the Code Blue Station at 120 ppm. 2. Flash the red section of the Corridor Dome Light and green section of any associated Zone Dome Lights at 120 ppm. 3 Flash the cade call light and sound a tone (120 ppm) at all Duty Stations. 4 Flash the patient's room number bed number call priority status (2) and sound a tone (120 ppm) at the Master Station Annunciator Flash the corresponding station annunciator lamp and sound a tone (120 ppm) on the existing Code Blue Annunciator located at the telephone switchboard. Two way voice conununication will not be possible between the Code Blue Station and the annunciator at the telephone switchboard. The PBX operator will announce the Code Blue via the public address system throughout the entire hospital. Calling facilities and two way voice communication between the nurses station any other utility areas can be accomplished from the Staff Station. A staff member can originate a call on the system by momentarily pressing the call button. Originating a call shall. 1 Illuminate the white call indicator lamp on the Staff Station. 2. Flash the call light and sound a tone (6 ppm) at all Duty and Staff Stations. 3 Flash the room number call priority status (7) and sound a tone (6 ppm) at the Master Station Annunciator MAHLUM NORDFORS McKINLEY.GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS SECTION 16750 PAGE 5 NURSE CALL SYSTEMS 4 Upon answer of the call from the Master Station a red privacy light shall be illuminated on the Staff Station and the staff member may carry on a two way conversation. I. DUTY STATION Provide same function as Staff Station. In addition the Duty Station shall provide audible and visual annunciation of calls placed from any other station in the system. Normal, Emergency and Code Blue calls are distinguished by a distinct difference in signal rate. J MASTER STATION ANNUNCIATOR The Master Station Annunciator can be used to call or receive calls from Patient Stations, Duty Stations, Staff Stations, or other Master Stations. Code Blue, Nurse Assist and Toilet Emergency Station calls are also annunciated at the Master Stations. When a call is placed on the system the room number, bed number and priority status is displayed in one of five numeric displays in order of it's priority status. (If all of the numeric displays are occupied, the Calls Waiting lamp on the Master Station shall illuminate.) Answering a call is accomplished by depressing the direct selection button adjacent to the numeric display Two way voice communication can then take place via the speaker microphone utilizing the talk listen bar or via a handset. If calls are not answered immediately the tone signal shall be repeated unless the nurse is in the process of answering other calls. Code Blue calls shall always be announced by a tone signal even if the Master Station is busy In addition to the communication and annunciation capabilities described above the following controls and options shall be provided. 1 Patient Priority Status programming. 2 Scanning of patient bed stations for Patient Priority Status. 3 Zone Monitoring and Paging of up to 20 stations simultaneously 4 Nurse Service. This feature shall permit the nurse at the Master Station to place a service reminder call on the system. Depressing the Nurse Service button shall. a. Flash the amber section of the Corridor Dome Light at 60 ppm. b. Flash the white call indicator on the Patient Station. c. Activate the overtime reminder circuitry in the Master Station. 5 Overtime Reminder The nurse at the Master Station shall automatically be alerted after an adjustable time period (3 to 10 minutes) if a Nurse Service call has gone unanswered. 6 Master Station Intertie: Master Stations on the same floor shall be capable of intercommunication. 7 Capture/Recapture: Each Master Station shall be able to capture calls from rooms in other units, display captured rooms and release these rooms. Each Master Station in 2 Main and 2 West shall be programmable to capture/recapture any room or combination of rooms within 2 Main and 2 West Units. K. PILLOW SPEAKER The Pillow Speaker shall allow the patient to place a call to the Master Station, turn a TV set off and on, change the TV channel and regulate the TV volume. Two -way voice communication is MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS carried on over the speaker in the Patient Station. In some areas the pillow speaker will also allow the patient to turn the headwall .light on and off. L. NAMEPLATES. Provide nameplate per Section 16100 with 1 /8 lettering on each nurse call cabinet. Label `Nurse Call' M. FIRE ALARM REMOTE ANNUNICATION At 2 Main provide complete remote annunciation of patient room smoke detection. Corridor dome light amber section shall provide indication of alarm in associated room. Master stations shall provide remote indication of alarms in all rooms. At 2 West provide provisions for future remote annunciation of patient room smoke detection. Installation shall require only future connection of smoke detector auxiliary contact. All other required components shall be provided. N MISCELLANEOUS ALARM ANNUNICATION Provide annunciation of miscellaneous alarms (narcotic cabinet alarm, recovery rear door alarm) at the Master Stations. PART 2 PRODUCTS 2.1 MANUFACTURE Rauland part numbers are specified to establish a basic design concept and Rauland equipment shall be provided under the basic bid. Electrical substitute bid. Executone, Dukane 2.2 FINISHES All exposed faceplates shall be high impact molded plastic and shall be capable of withstanding normal hospital cleaning solutions. 2.3 COMPONENTS SECTION 16750 PAGE 6 NURSE CALL SYSTEMS A. Patient Bed Station 1 Short Stay 1 West: BS140 2. Surgery 2 Main, 2 West: NCBSS1 B Pillow Speakers; Furnish one for each audio/visual patient station and twenty (20) spares. Provide each pillow speaker with a pillow speaker hanger Provide pillow speaker hanger for existing pillow speakers where indicated on plans. 1 Short Stay ES310 with SH100 Includes pushbuttons for nurse call and TV control. 2. 2 Main. ES3222 with ESH300 and SH310 Includes pushbuttons for nurse call, light 1 light 2, and TV control. 3 Surgery' ES3200 with `TV" label removed and with ESH300 and SH310 Includes pushbuttons for nurse call only 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 4 2 West: ES3200 with ESH300 and SH310. Includes pushbuttons for nurse call and TV control 5 1 West: ES312 with SH100. Includes pushbuttons for nurse call, light 1, light 2, and TV control C. Toilet Emergency Station: Provide with 6 foot long cord. 1- Short Stay 1 West: PCS113 2. Surgery 2 Main, 2 West: NCPCS1 D Nurse Assist Button. Provide with red pushbutton and "STAFF USE ONLY" label. 1 Short Stay 1 West: PBS113 2. Surgery 2 Main, 2 West: NCSPB1 E. Code Blue Button. Provide with blue pushbutton labeled 'CODE BLUE' Include 'STAFF USE ONLY" label. 1 Short Stay 1 West: PBS113 2. Surgery NCSPB1 F Surgery Code Blue Button. Provide with blue pushbutton labeled 'SURGERY CODE' Include "STAFF USE ONLY" label. 1 Surgery NCSPB 1 G Duty Station. 1 Short Stay DS230 2. Surgery 2 Main, 2 West: NCDUTY H. Staff Station. 1 Short Stay SS130 2. Surgery 2 Main, 2 West: NCSTAFF I. Master Station Annunciator 1 Surgery 2 Main, 2 West: NCTSM. J Dome Lights: Provide with white, amber, red and green lenses. 1 Short Stay 1 West: CL4096 2. Surgery 2 Main, 2 West: NCCLS4 L. Central Equipment: 1 Short Stay 1 West: Responder III (existing) 2 Surgery 2 Main, 2 West: Responder IV SECTION 16750 PAGE 7 NURSE CALL SYSTEMS K. Code Blue Annunciator Annunciator is an existing Rauland annunciator located at the PBX switchboard. Provide modifications to distinguish Surgery Code Blue calls from all other Code Blues calls. Label each lens with Department Name. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS M. Equipment Cabinet: Provide recess mounted type except surface mounted when installed in electrical closet. PART 3 EXECUTION 3.1 OUTLET BOXES' Provide an outlet box as required for each device. Refer to architectural interior elevations for exact location. See Section 16130 for mounting requirements. 3.2 RACEWAYS Refer to Section 16110 for installation requirements and to drawings for proper raceway size. Coordinate with system supplier for exact raceway requirements. Raceways indicated on the drawings are 3/4" unless noted otherwise. 3.3 WIRE Coordinate with system supplier for wiring requirements. 3.4 PRGRAMMLNG Coordinate custom features and call priorities programming for each department with Owner Coordinate room numbers/identification with Owner prior to final system programming. 3.5 TESTING SECTION 16750 PAGE 8 NURSE CALL SYSTEMS The completed system shall be tested and, after one subsequent week (minimum) "on -line' operation, demonstrated to operate satisfactorily in the presence of the Architect, Electrical Engineer and an Owner's representative. Correct any problems that surface during the test and re- demonstrate to the satisfaction of an Owner's Representative. 3.6 INSTRUCTION The Contractor shall (after one week notification to the Architect) conduct an 8 hour instruction session during which all maintenance and operational aspects of the system will be described and demonstrated to personnel selected by the Owner The session shall be conducted by a Contractor's representative thoroughly familiar with the characteristics of the system. 0 M manual information regarding the system shall be turned over to the Architect prior to scheduling the instruction session. 3.6 OPERATION AND MAINTENANCE MANUALS Provide per Section 16010 END OF SECTION 16750 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 SCOPE Provide modifications to and expansion of existing hospital wide intercom system. 1.2 RELATED WORK SPECIFIED ELSEWHERE Wires and Cables, Section 16120 Raceways, Section 16110 Outlet and Pull Boxes, Section 16130 Communications, Section 16700 1.3 SUBMITTALS A. Product Data. Assemble in submittal brochure as specified in Section 16100 SECTION 16758 PAGE 1 INTERCOM SYSTEMS B Shop Drawings 1 Reproducibles. Contractor shall pay a Seattle located reprographic company for having a set of erasable mylars made of the contract drawing floor plans. Contact engineer to arrange for printing. Nurse call shop drawings and intercom shop drawings may be combined if both systems are by the same supplier 2. Floor Plans. Floor plans shall be drafted to show conduit routing, device locations, wire count and color coded wiring between device locations on each plan. 3 Detail Plans. In addition to the contract set of mylar floor plans, the Contractor shall prepare original mylar drawings showing termination and connection diagrams including wire numbers for the entire system. 1.4 SYSTEM OPERATION The system shall provide hands free communications between stations and utilize fully electronic solid state controls. Calls shall be able to be placed from any station to any other station in the system by means of two or three digit pushbutton dialing. 1.5 SYSTEM CAPACITY Expand the system capacity as required to service the number of stations indicated plus an additional 10 PART 2 PRODUCTS 2.1 MANUFACTURER System shall be Philips to match existing. 2.2 STATION EQUIPMENT A. Desk Stations: Philips MIOOS to match existing. B Wall Station. Philips M100 with flush mounting backbox and frame to match existing. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS C. Re -use of existing stations. Existing intercom stations may be reused provided the stations are fully functioning and of `new' appearance. Existing stations shall be removed, cleaned, and tested in accordance with manufacturer's recommendations. Any stations found ncft fully functional or having worn or damaged appearance shall be replaced or factory reconditioned. D Ceiling Speakers: Low profile 8' speaker with talk -back capability Response frequency 55- 15,000 Hz. Magnetic structure shall be 10 oz. oriented ceramic. Provide transformer having at least three primary and two secondary taps. Provide all components and amplifiers necessary to interface ceiling speakers with existing intercom system. 2.3 CENTRAL EXCHANGE A. Philips S 80 is existing. Provide additional line cards as required. PART 3 EXECUTION 3.1 BACKBOXES A. Desk Station: Provide 4" square outlet box with single device plaster ring (if applicable). B Wall Stations: Install backbox furnished by system supplier Refer to Section 16130 for mounting requirements. 3.2 CENTRAL EQUIPMENT Modify the central equipment in basement communication room as required. 3.3 RACEWAYS 3.4 WIRE Coordinate with system supplier for wiring requirements and refer to Section 16700 for installation requirements. SECTION 16758 PAGE 2 INTERCOM SYSTEMS Provide raceways between intercom stations and the central equipment. Exact raceway requirements shall be determined by the system supplier and the raceway system shall be installed in accordance with the approved Intercom System shop drawings. Refer to Section 16700 for additional requirements and to Section 16110 for installation requirements. 3.5 SPEAKER INTERFACE Size interface amplifier (if required) and set transformer taps to provide adequate talk -back coverage within entire Recovery room area. Overhead speakers shall function as an independent extension on the existing intercom system. 3.6 STATION GROUPING See plans for extension modifications list. 3.7 SYSTEM PROGRAMMING The vendor shall include as part of his proposal the necessary amount of time required to meet the representatives from each department to explain the available program features and determine which 1 MAHLUM NORDFORS McKINNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 3.8 SYSTEM DIRECTORY 3.11 INSTRUCTION SESSION SECTION 16758 PAGE 3 INTERCOM SYSTEMS features are desired by which departments. A special feature programming plan shall be prepared for each department. After the special feature programming as approved by the hospital the system shall be programmed accordingly The vendof shall be responsible for preparation of a system directory including room number room name, department, floor level and station number The hospital will edit the directory and publish appropriate copies for each department. (If appropriate it would be desirable to have the intercom station number the same as the telephone system extension number when both devices are located in the same room area). 3.9 RECORD DRAWINGS The Owner shall be provided with record drawings included in the 0 M Manuals to show Actual routing of all raceways. Actual system wiring diagrams, connection diagrams and interface of all components in the system. 3.10 TESTING The completed system shall be tested and after one subsequent week (minimum) 'on line" operation demonstrated to operate satisfactorily in the presence of the Owner and Engineer When any defects are detected, make repairs or install replacement components and repeat the tests as requested by the Engineer The Contractor shall (after one week (minimum) written notification to the Owner) conduct 4 one hour instruction sessions (one for each department plus maintenance) during which all maintenance and operations aspects of the system will be demonstrated to personnel selected by the Owner The session shall be conducted by a contractor's and suppliers representative thoroughly familiar with the characteristics of the system. Instruction sessions may be scheduled for four different days if desired by the Owner Maintenance manual information regarding the system shall be turned over to the Engineer prior to scheduling the instruction. Maintenance staff technical training shall be available at selected time during the year to those customers who wish to maintain their owner systems. END OF SECTION 16758 MAHLUM NORDFORS McKLNLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 1.2 SHOP DRAWINGS PART 2 PRODUCTS 2.1 MANUFACTURER 2.2 MIXER/AMPLIFIER SECTION 16775 PAGE 1 PUBLIC ADDRESS 1 PART 1 GENERAL 1.1 DESCRIPTION A. Provide modification to and expansion of existing paging and music system in the project area. B. Provide system modifications as required to create a separate paging zone for the surgery area. Modified system shall include `all -call' capability New Surgery zone shall be paging only no music will be provided. C. Replace existing amps serving basement/1" and 2 /3 floors with three new amps serving basement/1" Surgery and 2 /3 D System shall be in steel raceways. Routing is not shown on the drawings, and it shall be the responsibility of the sound system supplier to design conduit routing and wiring and to show same on shop drawings. E. Paging System. The paging system shall provide for voice paging in areas shown with recessed ceiling speakers. Provide additional input on mixer /amplifier for existing background music. Attenuators shall be provided where shown to prevent disturbance of activities in those areas. Prepare and submit for review prior to shipment. Shall include complete system plan showing device layout, raceway routing, wiring, termination, and connection diagrams. This specification is based upon equipment as manufactured by Rauland. Rauland catalog numbers used for illustration. A. The mixer /amplifier shall provide a minimum of three separate inputs. Two inputs shall have low impedance balanced 150 ohm microphone inputs through the use of plug -in input transformers. One input shall also be convertible to high impedance "auxiliary' types. B The microphone inputs shall require no more than 0 003 volts signal for rated output. Each of the inputs shall also include an overload protective circuit. The overall dynamic range shall be 100 db or greater C. The mixer /amplifier shall also include full -range bass and treble tone controls providing at least 20 db range at 50 and 15 000 Hz. Individual level controls for each channel, a master gain control, and a power on/off switch shall also be included in the mixer/ amplifier D The solid -state amplifier section shall be capable of producing an audio output of 35 watts RMS at less than 1 percent distortion over the frequency range of 40 15,000 cycles, and the noise level shall be at least 70 db below rated output. The amplifier shall require no more than 0.3 volt input signal for rated output. Output regulation shall be less than 2 db from no load to full load. E. The amplifier section shall include an automatic and self restoring protective circuit that protects against damage from prolonged overloads and from extreme overloads, such as a shorted output line, and is not MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS Mount in existing P.A. cabinet. Provide extension cabinet as required. 2.5 CEILING SPEAKERS 2.6 ATTENUATORS SECTION 16775 PAGE 2 PUBLIC ADDRESS subject to activation by program peaks or other instantaneous overloads. Provide two (2). Series PR 16000 F Output jacks shall be provided for the mixer section, and input jacks shall be provided for amplifier section of the mixer /amplifier 2.3 FILTERS The high and low pass filters shall provide a system cutoff of 18 db per octave below 100 Hz and above 8,000 Hz. 2.4 EQUIPMENT MOUNTING A. The speakers shall be low profile two -way type, with an 8' woofer and a 3" tweeter Frequency response shall be 55 15 000 Hz, and power degree handling capacity 20 watts of program material. Magnetic structure shall be 10 oz. oriented ceramic. Mounted on each speaker shall be a line transformer having at least three primary and two secondary taps. Model USO -144 B The ceiling speakers shall be mounted in a flush enclosure. Model 62- 8/95 -8. Ten step auto transformer type, 10 watt rating, 3 db attenuation per step. Provide 1 gang metal plate and backbox. Similar to Soundolier AT 10 PART 3 EXECUTION 3.1 COORDINATION Coordinate with Architect for exact location of all devices prior to rough -in. 3.2 TESTING A. Frequency response shall be measured at one typical location below a speaker 1 Broadband pink noise shall be fed into the sound system at a level that is at least 10 db below the rated output of the system and at least 10 db above the background noise. 2. Response measurements shall be made with a microphone having uniform random incidence response with 1 db from 63 1 000 Hz and 2 db from 1,000 to 10,000 Hz. 3 The frequency response of the system shall be displayed on a Real Time Analyzer or hand charted. A photo or plot curve shall be made at each location and stage requiring documentation. B Documentation of tests shall be provided to the architect and shall consist of the following: 1 The unequalized curve made with the measuring microphone. 2. The equalized curve made with the measuring microphone. 3 The calibrated settings of each filter 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS 4 List of personnel and test equipment used. 3.3 EQUIPMENT RACK Existing. Modify as required. a 3.5 INSTRUCTION SECTION 16775 PAGE 3 PUBLIC ADDRESS The Contractor shall after one week (minimum) written notification to Architect conduct a two hour instruction session during which all maintenance and operational aspects of the system will be described and demonstrated to personnel selected by the Owner The session shall be conducted by a Contractor's representative thoroughly familiar with the characteristics of the system. O&M manual information regarding the system shall be turned over to the Architect prior to scheduling the instruction session. 3.6 OPERATION AND MAINTENANCE MANUALS Provide per Section 16010 Include record drawings showing at least the following: 1 As -built raceway routing on a floor plan drawing. 2. As -built cabling on a floor plan drawing. 3 As -built system wiring diagrams showing the electrical interface of all components supplied. END OF SECTION 16775 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION SECTION 16781 PAGE 1 TELEVISION DISTRIBUTION SYSTEM COMPLETION A. The work includes furnishing and installing all cable devices, and connectors necessary to extend the the existing television distribution system. The expanded system shall be complete and ready to use. The system shdll include all amplifiers, power supplies, cable, outlets, attenuators, and all other parts necessary for the distribution of the TV and FM signals. B The Contractor shall show satisfactory evidence, upon request, that he maintains a fully equipped service organization capable of furnishing adequate inspection and service to the system, including standard replacement parts. Contractor shall be prepared to offer a service contract for the maintenance of this system after the guarantee period. C. The Contractor shall construct the system, following best engineering techniques for continuous operation in accordance with applicable codes and safety precautions. D All television system equipment shall be supplied and installed by an authorized factory distributor who shall be a licensed and bonded television contractor holding a valid Washington State Electrical Contractor's license. E. Coordinate with the television set supplier for proper remote control wiring connections. 1.2 SYSTEM FUNCTIONS A. The system shall distribute television, signals to all TV outlets to permit simple connection of EIA standard television receivers. The system shall provide distribution of all the existing TV channels from the existing head end equipment. B. The system shall deliver at all outlets all monochrome and NTSC color television signals without introducing noticeable affect on intelligence and color fidelity 1 The distribution system shall provide for ready attachment of RF monitor/TV receivers at any outlet and at any time without additional auxiliary equipment. 2. The distribution system shall be operative at all times in such a manner that it is not subject to possible human error during the course of attachment or detachment of equipment at any outlet. C. The system shall deliver at all television outlets a minimum signal level of 10 db above 1,000 microvolts across 75 OHM impedance on each channel at each television outlet. The system VSWR shall not exceed 141 D The system and all equipment shall be designed and rated for 24 hours a day continuous operation. All active components shall be of solid state design. E. The system shall be designed to prevent direct pickup of signals from the building structure. 1.3 SHOP DRAWINGS Prepare and submit for review prior to shipment. Shall include complete system plan showing device layout, raceway routing, wiring, termination, and connection diagrams. MAHLUM NORDFORS McIONLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 2- PRODUCTS 2.1 MANUFACTURER All components shall be manufactured by RCA, Blonder Tongue Electronics Company or approved equal. Blonder Tongue catalogue numbers are used for reference unless manufacturer is identified. 2.2 GENERAL Conform with the requirements of Section 16700 2.3 DISTRIBUTION SYSTEM SECTION 16781 PAGE 2 TELEVISION DISTRIBUTION SYSTEM COMPLETION A. System coaxial cable shall be 82 channel 75 ohm 18 gauge solid conductor duofoil and brand shield, RG 6/U type cable. Standard cable 507 -6FA. All cable routed in cable tray or routed above the accessible ceiling shall be extinguishing as defined by NFPA 701 Section 6 -1 by the match flame test. Belden 9248. B. Coaxial cables shall be run in continuous lengths except for terminations and no splices shall be permitted in any run. C. All cables terminating at amplifiers or splitters shall be tagged as to function and destination. D All coaxial cable used in the system shall be sweep tested for transmission and structural return loss and be so certified in writing by the cable manufacturer Transmission sweep tests shall establish conformance to guaranteed loss values from 20 -108 MHz, 174 -216 MHz and 470 -890 MHz. Structural return loss tests by sweep method shall show a minimum return loss of 26 dB RL VHF 16 dB RL UHF as compared to a fixed 75 -ohm reference from 20 -108 MHz, 174- 216 HMz and from 470 -890 MHz. 2.4 DISTRIBUTION AMPLIFIER A. Broad band amplifiers shall be provided for VHF/FM band. Unit shall be of solid state design and contain its own power supply Model MVB-45 B Amplifier shall consist of independent high and low band input amplifiers, independent high and low band gain controls. The main amplifier shall have three stages of RF amplification. C. Amplifier shall have switchable, combined or split inputs for use with single (low band, FM, high band) antenna or for individual low band and high band antennas. Amplifier shall contain a switchable FM bandstop filter in the input circuit to prevent FM signal overload. D Amplifier shall meet gain of 45 dB in all bands; noise figure at full gain of 6.1 dB (LB), 6.7 dB (HB); a gain control range of 18 dB• output capability (7ch. -46 dB crossmode) Flat 54 dBmV 6 db block tilt 56 dBmV Operating temperature range shall be -20 degrees C to +65 degrees C. E. Amplifier dimensions shall be 19" in length, 3- 15/32" m width and 2 5/8" in height with mounting brackets to fit standard E IA rack. 2.5 LINE SPLITTERS A. Two -way line splitters shall have a flat frequency response over the entire operating band from 12 MHz to 300 MHz and from 470 to 890 MHz. The unit shall be of the hybrid design with a 75 ohm match of 23 0 dB RL minimum on all inputs and outputs. Output isolation shall be not less than 23 0 dB VHF 18.0 dB UHF MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS B Two -way line splitters shall have a signal loss of not more than VHF 3 7 dB UHF 4 0 dB at each output. All unused outputs on the splitters shall be terminated with 75 ohm terminations. C. Four -way line splitters shall have a flat frequency response over the entire operating band from 12 MHz to 216 MHz and from 470 to 890 MHz. The unit shall be of the hybrid design with a 75 ohm match of 24 0 dB RL minimum on all input and outputs. Output isolation shall be not less than 16 0 dB VHF 11.5 dB UHF D Four -way line splitters shall have a signal loss of not more than VHF 6.2 dB UHF 6.7 dB. E. Blonder Tongue Model MS -2VN or MS-4UN 2.6 ATTENUATORS SECTION 16781 PAGE 3 TELEVISION DISTRIBUTION SYSTEM COMPLETION Attenuators with DC to 890 MHz passband and 75 ohms input output impedance shall be installed to equalize all signals prior to input to amplifier The amount of attenuation shall be determined at field during system set -up. 2.7 TAPOFF INLINE Shall be single tap, back matched, directional coupler type with brass 75 ohm, type F connections. Band width shall be 5 0-400 MHz. Tapoff shall meet or exceed the following specifications: 2.8 TV OUTLETS 2.10 CONNECTOR Insertion loss 1.2 db maximum Tap isolation 24 0 db minimum Return loss 16 0 db minimum Blonder Tongue Model 4488 or 4888 series. A. Television Signal Outlets: Shall be mounted in 4" square, 2" deep minimum, flush mounted outlet boxes with barrier between the 110 volt receptacle and the TV signal cable. Provisions shall be incorporated in the network to prevent 60 Hz AC or DC feedback into the distribution lines. B Outlets shall be designed to cover a frequency range of 10 MHz to 500 MHz. Insertion loss shall not exceed 1 0 db at any frequency within the designated frequency range. Outlets shall be back matched from 10 to 500 MHz. Tap isolation shall be 16 db minimum. C. Outlets shall have "F" type connector and shall include a 5 PIN DIN receptacle for remote control applications. Blonder Tongue V 5- DC. D Coverplates shall match those specified in Section 16140 with standard double duplex configuration. 2.9 TV REMOTE CONTROL STATION TV Remote Control Station. Provide a two gang outlet box with pushbutton and volume controller to turn set on on-off, change channels and adjust the speaker volume. GTE Sylvania model HWT 6098BA chassis with a HFT6193BA faceplate. A. Connectors shall be brass, bronze or silver plated. MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS 2.11 DROP CABLES SECTION 16781 PAGE 4 TELEVISION DISTRIBUTION SYSTEM COMPLETION B. Connector threads shall be cut to assure good contact. Cast or pressed threads shall not be permitted. A. Provide coaxial cable with type F connector at wall outlet and appropriate connector at TV set. B. Provide control table with 5 pin DIN connector at wall outlet and appropriate 6 pin connector at TV set for remote on-off, station selection and volume control. PART 3 EXECUTION 3.1 GENERAL 3.2 RACEWAY SIZING Raceways shall be sized as follows unless shown to be larger on the drawings. Up to 3 television outlets: 1/2" trade size Up to 5 television outlets: 3/4" trade size. Cables shall be installed to avoid sharp bends or physical distortion. Protect cables over sharp edges. 3.3 AMPLIFIER INSTALLATION Install any new required amplifiers at existing backboards and cabinets, except at 2 Main, where amplifiers shall be installed in electrical room. PART 4 TESTING 4.1 TESTING On completion of the installation of the system, the Contractor supplying this equipment shall provide a, qualified technician to perform the following tests: A. The overall system shall be swept tested from the head -end location to the last outlet in each distribution leg of the system. B A certification shall be made to the fact that no frequency dropouts are present in the system which would affect any of the VHF channels. C. Using a return loss bridge, the Contractor shall certify that the return loss of the system shall be a minimum of 20 db down. D The Architect shall be notified forty-eight hours prior to testing so that he may at his discretion furnish representatives to witness the test procedure and results. E. A report of the testing shall be submitted on all the above required data, prior to final acceptance. Copies shall be included in the Operation Instructions and Maintenance Manuals. The report shall include the names of the individuals performing and witnessing the test, and the manufacturer's name and model number of the equipment used in the test. A block diagram of the test set -up for each test shall be included. END OF SECTION 16781 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN /SURGERY ADDITIONS ALTERATIONS PART 1- GENIERAL 1.1 DESCRIPTION Provide rough in boxes and raceways for a future dictation system. PART 2 PRODUCTS 2.1 RACEWAY Raceways and outlets shall be per Section 16110 and 16130 Raceway size shall be as shown. Provide plastic bushing on all open raceway ends. 2.2 DICTATION SYSTEM PULL BOXES NEMA 1 flush wall box, 14GA size as shown with screw cover Flush cover extends 1 inch over each side. Provide one 1 -1/4 inch grommeted hole in bottom of cover for entrance of control console cables. 2.3 DICTATION TRANSCRIPTION TERMINAL A. Wall Outlet: Shall consist of a 4 square, 2 -1/8" (minimum) deep box with single device plaster ring. B. Floor Outlet: See Section 16132. C Plates: Cable lead -in type. Type to match those specified in Sections 16140 16132, and 16133 Shall have a 5/16' grommeted hole in split plate. PART 3 EXECUTION 3.1 PULL CORDS Nylon type shall be included in all raceway 3.2 PLATES Provide for every outlet where equipment does not cover the outlet opening. SECTION 16791 PAGE 1 DICTATION RACEWAY SYSTEM END OF SECTION 16791 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION Provide U.L. listed lighting control and dimming equipment. PART 2 PRODUCTS 2.1 PHOTO CELL Off-day on- night, 1500 watt tungsten rated SPST contact, 2 to 5 footcandle adjustable light sensing range, time delayed switching, weatherproof. Tork #2100 or similar by Paragon or G.E. 2.2 LIGHTING CONTACTORS AND CONTROL RELAYS A. Contactors: Multipole, mechanically or electrically held as shown, rated for 480V operation. Contact rating 20A minimum or as required, with coil clearing contacts. Square D Class 8903 B. Control relays: Rated 600V 20A contacts. Square D Class 8501 XMO-40 C. NEMA 1 enclosures and 120V coils unless noted otherwise. 2.3 FLUORESECNE DIMMER U.L. listed, rated for 20 40 watt lamps 120V or 277V Similar to Lutron NG -20 Faceplate color Match other plates. Provide fixture with dimming ballasts recommended by the dimmer manufacturer See 16500 PART 3- EXECUTION 3.1 PHOTO CONTROL At skylights, mount photo cell in skylight. Orient light sensor toward skylight glazing and shield from skylight mounted strip light fixture. At exterior fixtures, orient photocell light sensor in a northerly direction 3.2 LIGHTING CONTROLS Install control equipment 'with required wiring to achieve lighting control noted. Outdoor lights off during daylight hours. 3.3 DIMMER VENTILATION Install to give manufacturer's recommended ventilation. SECTION 16930 PAGE 1 LIGHTING CONTROL EQUIPMENT END OF SECTION 16930 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION A. General. Provide all'electrical work listed in Section 14700, Pneumatic Tube System. SECTION 16950 PAGE 1 PNEUMATIC TUBE SYSTEM B Contractor Design. Raceways, routing, and wiring is not shown on the plans and shall be the responsibility of the contractor to design conduit routing and wiring and to show the same on record drawings. System shall be in steel raceways. C. Circuitry 1 Provide one 120 volt AC 20 amp power circuit from a normal power electrical panelboard to each new and existing pneumatic tube station in the remodel area. Refer to architectural plans for number and location of tube stations. Provide an individual 20 amp, 1 pole circuit breaker for each piece of equipment or station. 2. Provide control wiring to new and existing stations as shown on Pneumatic Tube System drawings. PART 2 PRODUCTS 2.1 RACEWAY AND OUTLET BOXES Provide per Sections 16110 and 16130 PART 3 EXECUTION 3 1 CIRCUIT AND EQUIPMENT INSTALLATION Install circuits and equipment in the locations shown on the pneumatic tube shop drawings. END OF SECTION 16950 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MAHLUM NORDFORS McKINLEY GORDON OLYMPIC MEMORIAL HOSPITAL 2MAIN/SURGERY ADDITIONS ALTERATIONS PART 1 GENERAL 1.1 DESCRIPTION SECTION 16999 PAGE 1 PROJECT CLOSEOUT Summary of procedures and requirements for project closeout of electrical portions of work. Conform also with other portions of the Contract Documents. Final payment to Contractor is subject to full completion of this Section. PART 2 PRODUCTS 2.1 RECORD DRAWINGS Reproducible, Xerox drawings. See 16010, 1 10 2.2 ELECTRICAL EQUIPMENT OPERATION AND MAINTENANCE (0 M) MANUALS Hardboard, screw post, imprinted covers. Tabbed dividers between categories. See 16010 1 11 PART 3 EXECUTION 3.1 REQUEST FOR FINAL PUNCH LIST To request a final electrical punch list, forward a letter to Sparling, Inc. stating; "The electrical work on this project is complete, all punch list items to date are complete, items 1 14 in Section 16999 3 02 are complete and the project is ready for final punch list observation" 3.2 JOB CLOSEOUT PROCEDURE A. Perform the following procedures for project closeout of electrical portions of work: 1 Perform testing, tests and documentation per 16030 2. Provide engraved nameplates on electrical equipment. 3 Refinish electrical equipment finishes which are damaged. 4 Clean up per 16100 3 05 Clean all parts of lighting fixtures. 5 Color code junction boxes per 16130 6 Provide spare fuses and cabinet per 16180 7 Type panel schedules with actual 'as- built' circuit descriptions. 8. Number all circuit breakers. 9 Obtain final electrical inspection. Include copies in 0 M manual. 10 Give written one year warranty in O M per 16010 1 09 11 Furnish Record Drawings per 16010 1 10 Obtain signature on Job Completion Form. 12. Furnish 0 M Manuals per 16010, 1 11 Obtain signature on Job Completion Form. 13 Give instruction periods to owner's personnel per 16010 1 12. Obtain signature on Job Completion Form. 14 Obtain letter of certification from fire alarm system supplier and forward to Sparling per 16700, 3 OIE. 15 Obtain letter of certification from communications system supplier(s) and forward to Sparling per 16700 3 01E. 16 To request final acceptance of project, fill out Job Completion Form in 16010 1 13 and forward to Sparling. Note: If inspectors have not signed form, a copy of signed -off permits will suffice. 17 Include with Job Completion Form, a copy of the final punch list with the word "DONE" and the date and Contractor's initials after each item on the list. END OF SECTION 16999