HomeMy WebLinkAbout5.350A Original Contract:ll`JP! d Ur nM ULYl41!'JI- Kt.'.71UA 1hh! Ji{1:J r.=l A
+1` WASHINGTON N STATF fFPARTMENT
OF TRANSPORTATION
CERTIFICATION ACCEPTANCE
QUALIFICATION AGREEMENT
r� nn7
AGENCY CITY OF PORT ANGELES AGENCY NO.
The noted agency hereby agrees to comply with the following requirements when developing all projects on Federal -aid
highway systems except the Interstate System.
1. I he Local Agency Guidelines and all policies and procedures promulgated by the Waahillgtelli State Dc}l'attmunt of
Transportation which accomplish the policies and objectives set forth in Title 23, U. S. Code, Highways and the
regulations issued pursuant thereto.
2, The overall approval authorities and conditions will be as follows:
a. The designs will be reviewed and approved by the following State of Washington registered professional civil
City Engineer
YOSltlon nle Unly
g•
engineer
h. The hearing's findings (if required) will be reviewed and approved by the following official or officials
Director of Public Works, or City Engineer
Pos?tion Title cr Titles Only
c. The contract plans, specification; and estimate of cost will be reviewed and approved by the following State of
Washington registered professional enginwwr City Engineer
d. Agreements will be signed by the following responsible local official'
Mayor
(1) Railroad
(2) utility
(3) Cunsuitent
(4) Ter.linic.dl SerVit.t:
engineer
Mayo r
Position Title Only
City Engineer
Position Title Only
Mayor
e. The award of contract will be signed by the following ccspurisiblt lue;al official
City Engineer
Position Title Only
City Engineer
Position Title Only
Pgsltlon Title Qnly
PoSltion Title Only
Position Tit le or Titles Only
990
AU State advertisement and award of contracts will be signed by the appropriate WSDOT official,
f, All projects will be constructed in conformance with the current Standard Specifications for Municipal Public
Works Construction or State of Washington Standard Specifications for Road and Bridge Construction and such
specifications that modify these specifications as appropriate.
The contract administration will be supervised by the following State of Washington registered prolessional civil
r 5. 301k
Ui,i UU RUA y Uo X I JL °Par !'L;, 1'Jr1
r
rA 0073
Vt. Materials sampling testing frequency will be accomplished and documents in conformance with the Local Agency
Guidelines. Materia testing facilities will be approved by the WSDOT.
3. The noted agency agrees that they have the means to provide adequate expertise and will have support staff avaiIable
to perform the functions being subdelegatcd. The support staff may include consultant or State services.
4. The noted agency agrees to submit the na ul the approving authorities noted in Section 2 above with u,ich
project prospectus.
S. MI projects under Certification Acceptance shall be available for review by the Fi•IWA and the State at any time and
all project documents he reta;ntrl anti available for inspection during the plan development and construction
stages and for a 3.year period after the submission of the final voucher for the project.
6. The State Aid Engineer's approval of this Local Agency Certification maybe rescinded at any time upon request by
the Local Agency or if, in the State Aid Engineer's opinion, it is necessary to fin us The rFSciccion may be applied
to all or part of the programs or projects approved in the Local Agency Certification.
Approved By.
Now
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
Sta AR/ Eno
Post -IC Fax Note 7671 1aae 10/23 1paVes
I r° t fig, ►t a
Co /CNec t
Phone S
Fax
J —470?
:H.. 111., iL f.
1)
Data
Ice.
I Phens
r aw
//223
tiat'e ff
r
Certification Acceptance Qualification Agreement
AGENCY CITY OF PORT ANGELES AGENCY NO. 0990
The agency agrees to comply with the following requirements when developing all Federal Highway Administration (FHWA)
projects under Full CA status.
1. Adherence to the Local Agency Guidelines and all policies and procedures promulgated by the Washington State Department
of Transportation (WSDOT) which accomplish the policies and objectives set forth in Title 23, U.S. Code, Highways, and the
regulations issued pursuant thereto.
2. The overall approval authorities and conditions will be as follows:
a. The designs and environmental documents will be reviewed and approved by the following state of Washington registered
Professional Civil Engineer.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title Only
b. The hearing's findings (if required) will be reviewed and approved by the following official or officials.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title or Titles Only
c. The contract plans, specifications and estimate of cost will be reviewed and approved by the following state of
Washington registered Professional Engineer.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title or Titles Only
d. Agreements will be signed by the following responsible local official:
g.
g.
(1) Railroad
(2) Utility
(3) Consultant
(4) Technical Services
Not Applicable
Position Title Only
Mavor/Denuty Mayor
Position Title Only
Mavor/Denuty Mayor
Position Title Only
Mavor/Denuty Mayor
Position Title Only
e. The award of contract will be signed by the following responsible local official.
Mayor/Deputy Mayor
Position Title Only
f. All projects will be constructed in conformance with the Washington State Department of Transportation/American
PublicWorks Association (WSDOT /APWA) current Standard Specifications for Road, Bridge, and Municipal
Construction and such specifications that modify these specifications as appropriate. Multimodal enhancement projects
shall be constructedin conformance with applicable state and local codes.
The contract administration will be supervised by the following state of Washington registered Professional Civil
Engineer.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title Only
Construction administration and material sampling and testing will be accomplished in accordance with the WSDOT
Construction Manual and the Local Agency Guidelines.
N•\PROJECTS\FORMS \Certification Acceptance Qualification Agreement.doc
5• &5o
3. The agency agrees that they have the means to provide adequate expertise and will have support staff available to perform
the functions being subdelegated. The support staff may include consultant or state services.
4. The agency agrees that the signature on each project prospectus and local agency agreement will be consistent with section 2
above.
5. All projects under Certification Acceptance shall be available for review by the FHWA and the state at any time and all
project documents shall be retained and available for inspection during the plan development and construction stages and for
a three year period following acceptance of the project by WSDOT.
6. Approval of the local agency certification by the Assistant Secretary for Highways and Local Programs may be rescinded at
any time upon local agency request or if, in the opinion of the Assistant Secretary for Highways and Local Programs, it is
necessary to do so. The rescission may be applied to all or part of the programs or projects approved in the local agency
certification.
Approved By:
OAAra
Mayor or Chair, j
WASHINGTON STATE DEPARTMENT
OF TRANSPORTATION
IT.ao
Assistan CAD ry for Highways and Local Programs Date
N:\PROJECTS\FORMS \Certification Acceptance Qualification Agreement.doc
Date
Certification Acceptance Qualification Agreement
AGENCY City of Port Angeles AGENCY NO. 0990
The agency agrees to comply with the following requirements when developing all Federal Highway Administration
(FHWA) projects under Full CA status.
1. Adherence to the Local Agency Guidelines and all policies and procedures promulgated by the Washington
State Department of Transportation (WSDOT) which accomplish the policies and objectives set forth in Title
23, U.S. Code, Highways, and the regulations issued pursuant thereto.
2. The overall approval authonties and conditions will be as follows:
a. The project prospectus will be reviewed and approved by the following official.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title Only
b. The local agency agreement will be reviewed and approved by the following official or officials.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title Only
c. The designs and environmental documents will be reviewed and approved by the following state of
Washington registered Professional Civil Engineer.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title Only
d. The hearing's findings (if required) will be reviewed and approved by the following official or officials.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title or Titles Only
e. The contract plans, specifications and estimate of cost will be reviewed and approved by the following state
of Washington registered Professional Engineer.
Deputy Director of Engineering Services /City Engineer or Director of Public Works
Position Title or Titles Only
f. Agreements will be signed by the following responsible local official.
g.
(1) Railroad Not Applicable
Position Title Only
(2) Utility Mavor/Deouty Mayor
Position Title Only
(3) Consultant Mavor/Denuty Mayor
Position Title Only
(4) Technical Services Mayor/Deputy Mayor
Position Title Only
The award of contract will be signed by the following responsible local official.
Mayor/Deputy Mayor
Position Title Only
h. All projects will be constructed in conformance with the Washington State Department of
Transportation/Amencan Public Works Association (WSDOT /APWA) current Standard Specifications for
Road, Bridge, and Municipal Construction and such specifications that modify these specifications as
appropriate. Multimodal enhancement projects shall be constructed in conformance with applicable state
and local codes.
Local Agency Guidelines
September 2002
N:1PWKSIENGINEERIFORMSI WSDO11 CAAFormNov02.doc
5. 350 IN
Certification Acceptance Qualification Agreement
i. The contract admuustration will be supervised by the following state of Washington registered Professional
Civil Engineer.
Deputy Director of Ennineerinn Services /City Engineer or Director of Public Works
Position Title Only
j. Construction administration and material sampling and testing will be accomplished in accordance with the
WSDOT Construction Manual and the Local Agency Guidelines.
3. The agency agrees that they have the means to provide adequate expertise and will have support staff available
to perform the functions being subdelegated. The support staff may include consultant or state services.
4. The agency agrees that the signature on each project prospectus and local agency agreement will be consistent
with section 2 above.
5. All projects under Certification Acceptance shall be available for review by the FHWA and the state at any time
and all project documents shall be retained and available for inspection during the plan development and
construction stages and for a three year period following acceptance of the project by WSDOT.
6. Approval of the local agency certification by the Assistant Secretary for Highways and Local Programs may be
rescinded at any time upon local agency request or if, m the opinion of the Assistant Secretary for Highways
and Local Programs, it is necessary to do so. The rescission may be applied to all or part of the programs or
projects approved in the local agency certification.
_Maliir or Chairman Date
Approved By:
Local Agency Guidelines
September 2002
I
WASHINGTON STATE DEPARTMENT
OF TRANSPORTATION
a,f (.-T _2/43
Dir ctor, Highways and Local Programs Date
N: I PWKSI ENG/NEERI FORMSI WSDOT 1 CAAFormNo v02. do c
City of Port Anoeles
2003 Preliminary Budget
•Ir City of Port Angeles
Council Member Council Member :i Orville Campbell Glenn Wiggins Council Member i Council Member i Council Member
Gary Braun Lauren Enckson Deputy Mayor
Mayor Richard Headrick Karen Rogers Larry Williams
2005 2003 i 2003 2003 2005 2005 2005
Public Works
Utilities
Department
Glenn Cutler
1
Boards
Community
Development
Department
Brad Collins
A t t omey
Craig Knutson
Atli 1 r.a/, ‘a...1 ie,
Port Angeles Citizens
City Manager
Michael
Quinn
1
r
Human
Resources Development I
Bob Coons
I Becky Upton
Tim Smith
Fire
Department
Dan McKeen
xvii i
*fi
Boards
(Advisory)
Finance Parks
Department Recreation
Yvonne Department
Ziomkowski Marc Connelly
Police
Department
Torn Riepe
2003
Glenn Cutler
ill Dir. of PW 8 Utilities 4801
85
PUBLIC WORKS AND UT DEPARTMENT
11/1/02
Scott McLain Cate Rinehart
Dep. Dir. Power Sys 4703 Admin Assistant
3 4700
Bob Kajfasz
Comm. Energy Analyst
4718
Gail McLain
Elec. Engr, Spec. II
4708
Enc Walrath
Assist. Civil Engineer I
4806
John Hebner Wayne Groff
Elec. Engr. Spec. II Engr. Survey Tech.
4706 4808
Bill Hale
GIS /CARD Spec. II
4810
Billy McCurdy
GIS /CADD Spec. I
4707
N•IPWKSIE NGINEERIPWBUENG.SG
Linda Gunderson
Admin. Assistant
4800
Gary Kenworthy
Dep. Dir. EngrJCityEngr.
4803
a
14
Kirk Johnson
PW Inspector
4812
Trenia Funston
Engr. Permit Specialist
4807
Kathy Trainor
Clerk- Typist
4724
Tern Partch Tom McCabe
Assist. Civil Engineer II Solid Waste Super.
4811 4876
Dave Ireland
Light Ops Manager
4731
Tom Kaufmann
Street Supervisor
4825
Larry Dunbar Jim Harper Jim Mahlum Steve Sperr Doyle McGinley
Power Resources Mgr. Elec. Engr. Mgr. Civil Engineer Utility Engineer W -WW Superintendent
4821 4855
4701
4710 4702 3 4 t 13
2 5
16
15
Jeff Young
WWTP Superintendent
4845
6
10
Pete Burrell
Equip. Superintendent
4835
5
Ken Ridout
Dep. Dir. Operations
4802
67