PROFESSIONAL SERVICES AGREEMENT
KCM P.D. 90228 KCM JOB
5.241
CLIENT /PROJECT CITY OF PORT ANGELES, WA VE OF TREATMENT PLANT EXPANSION
This Agreement is between Kramer, Chin Mayo, Inc., Consulting
Engineers, Architects, and Applied Scientists, 1917 First Avenue,
Seattle, Washington 98101, hereinafter referred to as "KCM," and The
City of Port Angeles, Washington, hereinafter referred to as the
"Client."
This agreement is for services generally described as conducting one
five -day value engineering (VE) study of the Client's wastewater
treatment plant expansion project and, more particularly, as
described in Attachment A, Scope of Work. Value Engineering Serv-
ices shall be in accordance with EPA VE Manual 430/9 84 009.
C. Initiation
KCM will initiate these services on receipt by KCM of a fully
executed copy of this agreement and a Notice -to- Proceed.
KCM will complete these services within the schedule defined in
Attachment A.
The compensation for these services to be paid to KCM shall be
a lump sum of $47,300.00.
In the event services beyond those specified in the Scope of Work and
not included in the compensation above are required, KCM shall submit
a fee estimate for such services, and a contract modification shall be
negotiated and approved by the Client prior to any effort being
expended on such services.
The following attachments are part of and applicable to this
agreement:
Attachment A, Scope of Work
G. Execution
This proposal becomes an agreement on execution by duly authorized
representatives of KCM and the Client.
H. Termination
This agreement shall remain in force until completion and acceptance of
the services or until terminated by mutual agreement.
This contract may be terminated by the Client and /or KCM on 21 days
written notice. In the event of such termination, KCM will be
paid the portion of the compensation earned to the termination date.
I. Schedule of Payments
KCM shall be paid the entire lump sum amount within 30 days of
submittal of the final report. Invoices unpaid for 30 days shall
accrue interest at the rate of 1 -1/2 percent per month.
J. Ownership of Documents
Drawings, specifications, reports, programs, manuals, or other
documents produced under this Agreement are instruments of service and
are, and shall remain, the property of KCM. Except as otherwise
provided in this Agreement, they shall not be used on other projects or
extensions to this project except by agreement in writing and with
appropriate compensation to KCM.
To the extent that the work product of KCM
other than its intended purpose under this
release KCM from all liability of whatever
purpose and the Client shall indemnify and
liability related to such other purpose.
K. Equal Opportunity Employment
is used for any purpose
Agreement, Client shall
nature related to such other
hold KCM harmless from all
KCM shall comply with all federal regulations pertaining to
Equal Opportunity Employment. KCM is in compliance with all state and
federal regulations concerning minority hiring. It is KCM's policy to
assure that applicants are employed and that employees are treated
equally during employment without regard to race, religion, sex, age,
color, or national origin. Such action includes employment,
upgrading, demotion or transfer, recruitment or recruitment
advertising, layoff or termination, rates of pay or other forms of
compensation, and selection for training or tuition assistance.
Accepted and Executed this 15th day of May 19 90
By: CITY OF PORT ANGELES, WA
Signed:
Accepted and Executed this I! day of t(-'( 19 14
By: KRAMER, CHIN MAYO, INC.
Signed:
4.1
o
Task 100 Project Management
EXHIBIT A
SCOPE OF WORK AND SCHEDULE
PORT ANGELES TREATMENT PLANT EXPANSION
VE SERVICES
Subtask 101 Project Management VE Workshop No. 1
The workshop participants will be contacted, and the times, dates and location of the
workshop arranged with all participants. Adjustments to team members or schedule will be
made, if required, and appropriate documentation provided to the City.
Task 200 VE Study No. 1
The VE study will be performed under three distinct tasks: Pre Workshop, Workshop and Post
Workshop activities. Table 1 shows the anticipated workshop schedule. Table 1 also shows
the team members who will work on the workshop team.
Subtask 201 Pre Workshop Activities Workshop No. 1
This stage of activity will involve the Value Engineering Team Coordinator (VETC) gathering
pertinent information, finalizing workshop and post workshop agendas and orienting the VE
workshop team. Key activities will include the following:
1. Contact design consultant and City staff to discuss workshop objectives and agenda;
2. Develop detailed VE Job Plan (i.e., study areas, rationale, workshop agenda, etc.).
3. Assemble and organize all pertinent background data: eight (8) copies of the materials
produced by the design team and City staff relevant to this project will be provided by City
to the VE Team no later than seven (7) working days prior to the workshop;
4. Review cost estimates for inconsistencies and completeness;
5. Prepare cost, energy and life cycle models as appropriate;
6. Review key assumptions for predesign or design (i.e., identify design criteria rationale);
7. VE workshop constraints will be outlined considering the information above.
8. Elements of the proposed design will be classified as having primary or secondary function.
9. The VE workshop team will be oriented to the information above in advance of the
workshop by the VETC.
Subtask 202 Workshop Activities
The workshop shall be a 40 -hour VE workshop format conducted in accordance with the Value
Engineering Task diagram shown as Figure 1 and utilizing the team members shown in Table 1.
The activities presented here are general. A more detailed agenda will be prepared by the
VETC during Subtask 201. Activities will include:
1. Information: During this phase, the design consultant will present the basic elements of the
proposed design, discuss the alternatives developed, and discuss the basis for project cost
estimating;
2. Speculation and Creativity: During this phase, every effort will be made to generate ideas
for design alternatives with the established constraints. The purpose is not to evaluate
ideas but to generate additional options to achieve the functions of the facilities. All ideas
generated during this phase should be recorded for later evaluation;
3. Evaluation and Analysis: During this phase, emphasis will be placed on examining the
ideas or combinations of ideas generated during the speculation and creativity phase.
Every effort should be made to find merit in each idea or combination of ideas before they
are accepted or rejected. Rough estimates may be needed during this phase. Criteria will
be established for evaluation the ideas;
4. Development and Recommendation: During this phase, the most feasible alternatives will
be evaluated in more detail. All design /performance criteria for the facility must be met.
Every effort will be made to maximize the various design elements. Implementation costs
to redesign, remove or modify existing facilities must be carefully analyzed. Equal level of
detail should be presented for each alternative. Cost will be only one factor of many to
consider in evaluating the acceptability or unacceptability of the alternatives; and
5. VE Workshop Report and Oral Presentation: The workshop team will make an oral
presentation of its recommendation to City and design staff at the conclusion of the study.
Subtask 203 Post Workshop Activities
Product: Ten (10). copies of the Preliminary VE Workshop Report and
Fifteen (15) copies of the Final VE Workshop Report.
Ten (10) copies of a preliminary report will be provided to City within three working days
following the conclusion of the workshop, containing the handwritten work products of the
workshop team and a typed summary of the VE proposals, to permit rapid initiation of review
by the designer and City staff.
The VETC will chair a 1/2 -day implementation meeting approximately 7 (seven) days
following receipt of designer's comments on the preliminary report, to assist the City in
reaching final decisions regarding implementation of the individual VE recommendations.
A final report will be prepared at the conclusion of this task.
report shall be submitted to the City within ten (10) working days after receipt by the
consultant of the City's final decisions on the VE recommendation.
Name Soedalty
Don Stafford VE /Sanitary
Roy Geiselman Civil
Allen Bellew Mech. /HVAC
George Riek WWTP Design
Chuck Lindquist Elec. /I &C
Zeki Beyaz Structural
Mel Streeter Architect
Richard Day Cost /Schedule
TABLE 1
VE WORKSHOP TEAM
Firm
KCM
KCM
KCM
CDM
CDM
Beyaz Patel
Streeter /Dermanis
Consultant
Workshop
Participation
5 days
5 days
5 days
5 days
4 days
5 days
5 days
5 days
PRESTUDY PREPARATION
I
PROJECT COORDINATION
Define Schedule
Describe Format For Coal Data
Provide Outline For Designer
Presentation
Outline Necessary Background
Data
WORKSHOP
INFORMATION PHASE
Introduction
Project Presentation by
Designer
Owner Presentation of Goals
Constraints
Analyze Project Costs
Function Analysis
Fast Diagram
Develop Cost/Worth Ratios
POST STUDY EFFORT
i
PRELIMINARY REPORT
Preliminary VE Report
CREATIVE PHASE
PRESTUDY PREPARATION
CoRoca Design Data
Distribute to Team Members
Verify Cost Dale
Outline Protect Constraints
Reivew by Team Members
Introduclion
Creative Idea Listing
o Quantity of Ideas
o
Association of Ideas
o Brainstorming
o Group Creative Thinking
o Individual Creative Thinking
IMPLEMENTATION
Meet with Owner Designer
Assist In Anal Dedsion
Prepare F1na1 Report
JUDGEMENT PRASE
Eliminate Impractical Ideas
Ralo Ideas with Advantages
Disadvantages
Weighted Evaluations Including
Non- Economic Considerations,
Solely, Reliability,
Environmental, Appearance,
Maintainability, Etc.
Soled Best Ideas for
Development
DEVELOP ENERGY MODEL
Develop by Process Area
Develop by Typo of Use
Outline High Energy Areas
DEVELOP COST MODELS
Distribute by Process
Dislubule by Trade
Outline 1 kph Cosi Areas
DEVELOP TIME MODEL
(Optional)
Crlilcal Path
Project Constraints
DEVELOPMENT PI IASE
Develop Preliminary
Doslgn of Ideas Including
o Prepare Alternate Design
Skulches
o Prepare Estimate
o Life Cycle Cost Comparisons
o Advantages a Disadvantages
PROJECT FOLLOW -UP
(Optional)
Bld Analysis
In -depth Review
Estimate Implemenlalion
Schedule Analysis
Post Operational Evaluation
KCM
DEVELOP LCC MODEL
Capital
O&M
Energy
PRESENTATION PHASE
Summarize Findings
Present 10 Owner-Designer
Anawor Quesllona 10 Clarify
Kramer. Chin Mayo, Inc.
1917 First Avenue
Seattle, Washington 98101
Value Engineering Task Diagram
PROJECT: PORT ANGELES VWWTP VE
FIRM NAME
KRAMER CHIN MAYO
SUBCONSULTANTS
BEYAZ PATEL
STREETER DERMANIS ASSOC.
RICHARD DAY
CDM
SUBTOTAL SUBCONSULTANTS
MARK -UP ON SUBCONSULTANTS(5
TOTAL
VE STUDY 1
$22,370
$3,453
$4,132
$2,766
$13,392
$23,743
$1,187
$47,300
5/7/90
FIRM NAME
STUDY NO
OVERHEAD MULTIPLIER
LABOR FEE PERCENTAGE
EXPENSES FEE PERCENTAGI
KCM
1
MANAGEMENT
LABOR
STAFFORD
BELLEW
GEISELMAN
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES@
SUBTOTAL MARKED -UP EXPENSES
TOTAL MANAGEMENT
PRESTUDY
LABOR
STAFFORD
BELLEW
GEISELMAN
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES
SUBTOTAL MARKED -UP EXPENSES
TOTAL PRESTUDY
1 659
12 0% PORT ANGELES WWTP VE
10 0% WORKSHOP DATE 6/90
8 HOURS@
HOURS
HOURS@
8 HOURS@
1 6 HOURS
1.659
12.0%
10.0%
DAYS@ $50 00
TRIPS
DAYS@ $120 00
COPIES C $0.10
4 HOURS@ $12.00
1 2 HOURS@
4 HOURS@
4 HOURS@
1 2 HOURS@
32 HOURS
1.659
12 0%
10 0%
PROJECT
$30.54
$25.21
$25.86
$12.36
$30.54
$25 21
$25 86
$12 36
DAYS@ $50 00
TRIPS $0.00
DAYS@ $120.00
500 COPIES $0 10
6 HOURS@ $12.00
KCM VE 1
TOTAL
$244 32
$0 00
$0 00
$98 88
$343.20
$569.37
$912.57
$109 51
$1,022.08
$20 00
$0.00
$0 00
$0.00
$0 00
$20 00
$48 00
$50 00
$138 00
$13 80
$151 80
I $1,173 88
TOTAL
$366 48
$100 84
$103 44
$148 32
$719 08
$1.192.95
$1,912.03
$229 44
$2,141 48
$20 00
$0 00
$0 00
$0.00
$50 00
$100 00
$72.00
$50.00
$292.00
$29 20
$321 20
$2,462 68
5/7/90
WORKSHOP
LABOR
STAFFORD
BELLEW
GEISELMAN
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC.)
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL WORKSHOP
POST STUDY
LABOR
STAFFORD
LYNCH
DRAFTING
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR 12 0%
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
REPORTS
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE CN EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL POST STUDY
TOTAL STUDY NO 1
40 IiCURS@
40 I -OJRS@
40 HOURS@
4 FOURS
124 I-ICURS
1.659
12.0%
DAYS
TRIPS
DAYS
300 COPIES@
HOURS
48 HOURS@
2 HOURS@
1 2 HOURS@
48 HOURS@
110 HOURS
1.659
DAYS
TRIPS
DAYS
300 COPIESc
25 COPIES@
32 HOURS@
$30 54
$25 21
$25.86
$12 36
$50 00
$0 00
$120 00
$0.10
$12 00
$30 54
$29.25
$10 34
$12 36
$50 00
$0 00
$120 00
$0.10
$50 00
$12 00
TOTAL
$1,221 60
$1,008 40
$1,034.40
$49.44
$3,313 84
$5.497 66
$8,811 50
$1.057 38
$9,868 88
$0 00
$0 00
$0.00
$0 00
$30 00
$20 00
$0 00
$50 00
$100 00
$10 00
$110 00
I $9,978 88
TOTAL
$1,465 92
$58 50
$124 08
$593 28
$2,241.78
$3,719 11
$5,960 89
$715 31
$6,676 20
$75.00
$0 00
$0 00
$0 00
$30 00
$1,250 00
$50.00
$384 00
$100 00
$1,889 00
$188 90
$2.077 90
$8.754 10
$22,369 54
FIRM NAME BEYAZ PATEL
STUDY NO 1
OVERHEAD MULTIPLIER
LABOR FEE PERCENTAGE
EXPENSES FEE PERCENTAGE
MANAGEMENT
LABOR
BEYAZ
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES
SUBTOTAL MARKED -UP EXPENSES
TOTAL MANAGEMENT
PRESTUDY
LABOR
BEYAZ
0
0
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC.)
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES
SUBTOTAL MARKED -UP EXPENSES
TOTAL PRESTUDY
1.400
12.0% PORT ANGELES WWTP VE
10.0% WORKSHOP DATE: 6/90
1 HOURS@
HOURS
HOURS@
1 HOURS@
2 HOURS
1 .400
12 0%
10 0%
DAYS $50.00
TRIPS@
DAYS@ $120 00
COPIES $0 10
HOURS@ $12.00
4 HOURS@
HOURS@
HOURS@
0 HOURS@
4 HOURS
1 400
12 0%
10 0%
PROJECT
$28 10
$12.00
$28 10
$0 00
$0 00
$12 00
DAYS@ $50 00
TRIPS $0.00
DAYS@ $120 00
COPIES $0 10
HOURS@ $12 00
BEYAZ PATEL VE 1
TOTAL
$28 10
$0 00
$0.00
$12 00
$40 10
$56 14
$96 24
$11 55
$107 79
$0.00
$0.00
$0 00
$0 00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
I $107 79
TOTAL
$112.40
$0.00
$0.00
$0 00
$112.40
$157.36
$269 76
$32.37
$302.13
$0 00
$0 00
$0 00
$0 00
$0 00
$0 00
$0 00
$0.00
$0 00
$0.00
$0 00
$302 13
5/7/90
WORKSHOP
LABOR
BEYAZ
0
0
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC.)
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES@ 10.0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL POST STUDY
TOTAL
40 HOURS@ $28 10 $1,124.00
HOURS@ $0 00 $0.00
I CURS@ $0 00 $0 00
0 I -CURS@ $1200 $000
40 HOURS $1,12400
1.400 $1.573 60
$2,697.60
120% $32371
$3,021 31
EXPENSES
MILEAGE/PARKING
CAR RENTAL DAYS@ $50.00
AIRFARE TRIPS@ $670.00
PER DIEM DAYS@ $120 00
PRINTING(MISC.) COPIES E2 $0.10
POSTAGE/TELEPHONE
COMPUTER TIME HOURS@ $12 00
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL WORKSHOP
POST STUDY
LABOR
BEYAZ 0 HOURS@
0 0 HOURS
0 0 HOURS@
CLERICAL 0 HOURS@
SUBTOTAL RAW LABOR 0 HOURS
OVERHEAD 1 400
SUBTOTAL
FEE ON LABOR 12.0%
SUBTOTAL MARKED -UP LABOR
$28 10
$0 00
$0 00
$12 00
DAYS@ $50 00
TRIPS $0 00
DAYS@ $120.00
COPIES C $0.10
HOURS@ $12 00
$0.00
$0 00
$0 00
$0 00
$0 00
$0.00
$0 00
$20.00
$20.00
$2 00
$22 00
I $3,043.31
TOTAL
$0.00
$0 00
$0 00
$0.00
$0.00
$0 00
$0 00
$0.00
$0.00
$0 00
$0.00
$0 00
$0 00
$0 00
$0.00
$0 00
$0 00
$0 00
TOTAL STUDY NO 1 I $3,453.23
FIRM NAME STREETER DERMANIS ASSOC.
STUDY NO 1 PROJECT
OVERHEAD MULTIPLIER 1.520
LABOR FEE PERCENTAGE 12 0% PORT ANGELES WWTP VE
EXPENSES FEE PERCENTAGE 10 0% WORKSHOP DATE: 4/90
MANAGEMENT
LABOR
STREETER
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES
SUBTOTAL MARKED -UP EXPENSES
TOTAL MANAGEMENT
PRESTUDY
LABOR
STREETER
0
0
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES
SUBTOTAL MARKED -UP EXPENSES
TOTAL PRESTUDY
1 HOURS
HOURS
HOURS@
1 HOURS@
2 HOURS
1 520
12.0%
10 0%
12 0%
DAYS@ $50 00
TRIPS
DAYS@ $120 00
COPIES $010
HOURS@ $12 00
4 HOURS@
HOURS@
HOURS
0 HOURS@
4 HOURS
1.520
$31 75
$0 00
$0.00
$12.00
SDA VE 1
WORKSHOP
TOTAL LABOR
$31 75 $31.75 STREETER 40 HOURS@
$0 00 0 HOURS@
$0.00 0 HOURS@
$12 00 $12.00 CLERICAL I -OURS@
$43.75 SUBTOTAL RAW LABOR 40 I-DJRS
$66 50 OVERHEAD 1 520
$110 25 SUBTOTAL
$13 23 FEE ON LABOR 12 0%
$123 48 SUBTOTAL MARKED -UP LABOR
$0 00
$0 00
$0 00
$0 00
$0 00
$0 00
$20.00
$20.00
$2.00
$22 00
I $145.48
TOTAL
$127 00
$0 00
$0 00
$0 00
$127 00
$193 04
$320 04
$38 40
$358 44
DAYS $50 00 $0 00
TRIPS $0.00 $0 00
DAYS@ $120 00 $0 00
COPIES C $0 10 $0.00
HOURS@ 812.00 $0.00
$20 00
820.00
10 0% $2 00
$22 00
$380 44
5/7/90
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC.)
POSTAGE/TELEPHONE
COMPUTERTIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL WORKSHOP
POST STUDY
LABOR
STREETER
0
0
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTERTIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL POST STUDY
O HOURS@
O HOURS
O HOURS@
O HOURS@
O HOURS
1 520
12 0%
$31.75
$0 00
$0.00
$12.00
DAYS $50 00
TRIPS $650 00
DAYS $120 00
COPIES@ $010
HOURS@ $12 00
$31.75
$000
$000
$1200
DAYS@ $50 00
TRIPS $0 00
DAYS $120 00
COPIES@ $010
HOURS@ $12.00
TOTAL
$1,270 00
$0 00
$0 00
$0 00
$1,270 00
$1.930 40
$3,200 40
$384.05
$3,584.45
$0.00
$0.00
$0.00
$0.00
$0.00
$0 00
$0 00
$20 00
$20 00
$2 00
$22 00
I $3,606.45
TOTAL
$0 00
$0.00
$0.00
$0 00
$0.00
$0.00
$0.00
$0 00
$0 00
$0.00
$0.00
$0.00
$0.00
$0 00
$0 00
$0 00
$0 00
$0 00
TOTAL STUDY NO 1 I $4,132.37
FIRM NAME DICK DAY
STUDY NO. 1
OVERHEAD MULTIPLIER
LABOR FEE PERCENTAGE
EXPENSES FEE PERCENTAGE'
MANAGEMENT
LABOR
DAY
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC.)
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES
SUBTOTAL MARKED -UP EXPENSES
TOTAL PRESTUDY
PROJECT
0 000
0 0% PORT ANGELES WWTP VE
10 0% WORKSHOP DATE: 6/90
1 HOURS@
HOURS
HOURS@
0 HOURS@
1 HOURS
0.000
0 0%
EXPENSES
MILEAGE /PARKING
CAR RENTAL DAYS@ $50.00
AIRFARE TRIPS@
PER DIEM DAYS@ $120.00
PRINTING(MISC.) COPIES $0.10
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL MANAGEMENT
PRESTUDY
LABOR
DAY 4 HOURS@
O HOURS@
O HOURS@
CLERICAL 0 HOURS@
SUBTOTAL RAW LABOR 4 I- OURS
OVERHEAD 0 000
SUBTOTAL
FEE ON LABOR 0 0%
SUBTOTAL MARKED -UP LABOR
10 0%
HOURS@ $12 00
$60 00
$0 00
$0 00
$0 00
DAYS@ $50.00
TRIPS@ $0.00
DAYS@ $120.00
COPIES $0.10
HOURS@ $12 00
DAY VE 1
WORKSHOP
TOTAL LABOR
$60.00 $60 00 DAY 40 HOURS@
$0 00 0 HOURS@
$0 00 0 HOURS@
$0 00 $0.00 CLERICAL 0 HOURS@
$60.00 SUBTOTAL RAW LABOR 40 HOURS
$0 00 OVERHEAD 0 000
$60.00 SUBTOTAL
$0 00 FEE ON LABOR 0 0%
$60.00 SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE/PARKING
$0.00 CAR RENTAL
$0.00 AIRFARE
$0.00 PER DIEM
$0.00 PRINTING(MISC.)
$0 00 POSTAGE/TELEPHONE
$0 00 COMPUTERTIME
$0.00 MISCELLANEOUS
$0.00 SUBTOTAL EXPENSES
$0.00 FEE ON EXPENSES 10 0%
$0 00 SUBTOTAL MARKED -UP EXPENSES
$60 00 TOTAL WORKSHOP
POST STUDY
LABOR
DAY
TOTAL
$240.00
$0 00
$0 00
$0 00
$240 00
$0 00
$240.00
$0 00
$240.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20 00
$20 00
$2 00
$22 00
I $262 00
5/7/90
0
0
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
0 0%
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL POST STUDY
O HOURS
HOURS
HOURS
O HOURS@
0 HOURS
0.000
$60 00
$0 00
$0 00
$0 00
DAYS $50 00
TRIPS $0.00
DAYS $120.00
COPIES C $0 10
HOURS@ $12 00
$60 00
$0.00
$0 00
$0 00
DAYS@ $50 00
TRIPS $0.00
DAYS@ $120 00
COPIES CI $0.10
HOURS@ $12.00
TOTAL
$2,400 00
$0.00
$0.00
$0 00
$2,400 00
$0 00
$2,400 00
$0 00
$2,400 00
$20 00
$0.00
$0 00
$0.00
$0 00
$0 00
$0.00
$20 00
$40.00
$4 00
$44 00
$2,444.00
TOTAL
$0.00
$0 00
$0 00
$0 00
$0 00
$0 00
$0.00
$0 00
$0 00
$0.00
$0 00
$0 00
$0 00
$0.00
$0.00
$0 00
$0 00
$0 00
TOTAL STUDY NO 1 I $2.766 00
FIRM NAME
STUDY NO
OVERHEAD MULTIPLIER
LABOR FEE PERCENTAGE
EXPENSES FEE PERCENTAGE
MANAGEMENT
LABOR
RIEK
LINDQUIST
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES@
SUBTOTAL MARKED -UP EXPENSES
TOTAL MANAGEMENT
PRESTUDY
LABOR
RIEK
LINDQUIST
0
CCM
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE /PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC.)
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES
SUBTOTAL MARKED -UP EXPENSES
TOTAL PRESTUDY
1.799
12.0% PORT ANGELES WWTP VE
10 0% WORKSHOP DATE: 6/90
1 HOURS@
1 HOURS@
HOURS
1 HOURS@
3 HOURS
1 799
12 0%
10.0%
DAYS@ $50.00
TRIPS
DAYS@ $120 00
COPIES C $0 10
HOURS@ $12.00
4 HOURS@
4 HOURS
HOURS
0 HOURS@
8 HOURS
1.799
12.0%
10.0%
PROJECT
$43 75
$34 61
$12.00
$43 75
$34 61
$0 00
$12 00
DAYS@ $50 00
TRIPS@ $0 00
DAYS@ $120 00
COPIES $0 10
HOURS@ $12 00
CDMVE1
TOTAL
$43.75
$34 61
$0.00
$12 00
$90 36
$162 56
$252.92
$30 35
$283 27
$0.00
$0.00
$0 00
$000
$0 00
$0.00
$0.00
$0 00
$0.00
$0 00
$0 00
I $283 27
TOTAL
$175 00
$138.44
$0 00
$000
$313 44
$563 88
$877 32
$105 28
$982.60
$0.00
$0 00
$0 00
$0 00
$0 00
$0.00
$0.00
$40 00
$40.00
$4.00
$44 00
I $1,026.60
5/7/90
WORKSHOP
LABOR
RIEK
LINDQUIST
CLERICAL
SUBTOTAL RAW LABOR
OVERHEAD
SUBTOTAL
FEE ON LABOR
SUBTOTAL MARKED -UP LABOR
40 HOURS@
32 HOURS@
0 HOURS@
CLERICAL 0 I-ICURS@
SUBTOTAL RAW LABOR 72 HOURS
OVERHEAD 1.799
SUBTOTAL
FEE ON LABOR 12.0%
SUBTOTAL MARKED -UP LABOR
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL WORKSHOP
POST STUDY
LABOR
RIEK
LINDQUIST
0
12.0%
EXPENSES
MILEAGE/PARKING
CAR RENTAL
AIRFARE
PER DIEM
PRINTING(MISC
POSTAGE/TELEPHONE
COMPUTER TIME
MISCELLANEOUS
SUBTOTAL EXPENSES
FEE ON EXPENSES 10 0%
SUBTOTAL MARKED -UP EXPENSES
TOTAL POST STUDY
DAYS
2 TRIPS
9 DAYS@
COPIES C
HOURS@
0 HOURS
0 HOURS@
0 HOURS@
0 HOURS@
0 HOURS
1.799
$43.75
$3461
$000
$1200
$50.00
$770 00
$120 00
$0 10
$12 00
$43.75
$34.61
$0.00
$12 00
DAYS@ $50 00
TRIPS $0.00
DAYS@ $120 00
COPIES@ $010
HOURS@ $12 00
TOTAL
$1,750 00
$1,107.52
$0 00
$0 00
$2,857 52
$5.140 68
$7,998 20
$959.78
$8,957.98
$100.00
$0 00
$1,540 00
$1,080 00
$0.00
$20 00
$0.00
$100 00
$2,840 00
$284 00
$3.124 00
I $12,081 98
TOTAL
$0.00
$0 00
$0 00
$0 00
$0.00
$0 00
$0 00
$0.00
$0 00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0 00
$0 00
$000
TOTAL STUDY NO 1 1 $13.391 85