HomeMy WebLinkAbout902 E 6th St - Building0 Concept Review.
0 Preliminary Review
0 Final Review
COMMENT
NO
PROJECT NAME.
V 1104_04 [12/93)
SENT FOR DEPARTMENT REVIEW ON C -2 3 '?'9
REVIEWING DEPARTMENTBuilding 1 PW Engineering
DEPARTMENT COMMENTS RETURNED
NOTE TO PLAN SUBMITTER: AB plan commenas require vain= response and/or correction for permit issuance. Return response with plan resubminal. Approval of ALL, reviewing depausatents required prior to
permit issuance
0 Revision
DRAWING OR
SPEC REF
other 0 Reviewed by
(Ill 1= Z*,)
eh. Oe
31 1- _z-z.).6-1072 /:_er
Rws
I //fist,- 4,b,e77-//47e,e0a) OA/ ,767
IR/514).
511 c/ge,AJT" 00.0)4? 7 Ain.Vt5 Dae7e-
`'"e36 2 71:, pA7z1.r/A) zhtteod D
.4r77e is (7.,J
546ai zo der--", es.
0 Not approved. Comments returned to subminer for response and or correction.
REVIEWING DEPARTMENT FINAL APPROVAL.
by Daze
LOCATION. 97)
c2 E VtA
PLAN REVIEW COMMENTS
1 Wastewater Water [1 Street Solid Waste [1 Light Fire
COMMENTS TO SUBMITTER: SUBMITTER RESPONSE DATE.
COMMENTS
DK)
Rust /174zifes-
ist-"J
STATUS CODES.
A COMMENT ACCEPTED
C CORRECTION MADE
N NO RESPONSE REQ'D
PERMIT
BACK CHECK
BY/DATE.
/1/ 00
S
T
A
T
U
S