HomeMy WebLinkAbout1011 Cathleen St Technical - BuildingTECHNICAL
Permit 01— c i 5 3
Address l R Ccd-kl-obn
Project description New 3■ v rn 14 Reen
Date the permit was finaled 10 2-H-08
Number of technical pages
t.
r
r`
Plan 91096B -3 Cat
FOR
Suntel Home Design
In return for payment of a one -time fee, 3atte/e/ Architecture Engineering, Inc. grants
you a limited license to use the Analysis to construct one single house a the address shown
below This lateral analysis is not to be used for any master plan approval process.
Site Location. 1011 Cathleen St, Port Angeles, WA. Only
Copyright: 9863
NOTICE: If the Building Department accepts the Analysis without an engineer's
onginal "wet- stamp" seal signed with red ink or for different site location than shown above,
then it is agreed that such Building Department accepts total liability out of or m connection
with this Analysis.
CALCULATIONS, SHEAR SHEET, L -SHEET VALID ONLY WITH
ORIGINAL STAMP HERE AND DIGITAL STAMP ON PLANS
AND
CAN NOT BE USED
AFTER
December 2007
v
Designs Engineering, Inc
I,ATERAL, ANALYSIS
LIABILITY LIMITATIONS
e2jaill i Designs Engineering, "FDE was retained in a limited capacity for this project. Design is
based upon information provided by the Client, who is solely responsible for accuracy of same No responsibility
and liability is assumed to FDE for items beyond that shown on these sheets. No construction observations nor
soils investigations performed by FDE
INDEMNIFICATIONS BY BULLDE` DEPARTMENT
Building Department agrees to (Mend, indemnify and hold harmless FDE from any loss, costs damage,
expense including attorney fees upon trial or appeal, for liability arising out of or in connection with
FDE's Analysis unless Analysis is used for snecific site location shown on cover nave and contains an
original engineer's "wet stamp" seal signed with red ink (no nhotocouy allowed).
OWNERSHIP OF DOCUMENTS
Project. Lexington -3Car
File #91096B- 110D -D2 -WA
Client: Suntel Home Design
By RF
Date 1/2006
Job No 2088
ANALYZE BUILDING FOR ONLY WIND SEISMIC FORCES
according to the
2003 INTERNATIONAL BUILDING CODE
WIND ANALYSIS FOR EXPOSURE "D" 110 MPH (3 -sec Gust)
SEISMIC ANALYSIS FOR ZONE D2
Sheet No
i li s
All documents produced by FDE shall remain the property of FDE and shall not be used unless accompanied by ar
original engineer's wet -stamp issued from FDE
r-
Designs Engineering, Inc
WOOD SHAKES
Project. Lexington 3Car
File #91096B- 110D -D2 -WA
Client: Suntel Horne Design
KA)
SCALE VS
111
IL,,IPL. t:- 11111 I !IH it L i ii'1
.7pV 11,
��in'! 1 11 l i t
I_
III I I ilMI
I l I N I_
9 11 I�
1 1 Atl IIC
II II II=
I II IA
1111111 1111
ID 1 IIII 1 11 1�I
1 J r, 11 I IL"
uu II N
91111 1 11
I
1' -0'
By RF
Date 1/2006
Job No 2088
7 X MAIN =DAR
COINER POA 6
TYPICAL ALL
M. R.Adl.D RL'bYW CEDAR
X 19 OCLTLY!
Sheet No
IT-
Designs Engineering, Inc
ii;irs rantr cerws OW1:01 ors 514N2I-E5
11;111111!!1111111
47:T4711111111',1 11 11iliti Ii1 1111 1171" T i l' i l' i l;r' '1111
F ll ill Hi
,v.....• 1
till
-7..
i l ...t.
.iii_
it tun= g=4.! I ititii iiiir
in a ........nni. Limn inpl t III t
L
i;■;;;;;',
I 11•111111111•1110•
mu m "',.111111;1111111111 1 :1,,11511R11 I
h 'I lii 1,
on mi. MIMI i 1 I 1
I1=
MIN
EN
NEN i
MA 11.1 E i
no
i
INN
it
ii
r o
eCAI! 1/44
2 X 10 RESAWN CEDAR
BARGE RAFTERS
We= EDGED Ca CRE7E ISTO2`.
WOOD SHAKES
Project: Lexington –3 Car
File #91096B-110D–D2–WA
Client: Stintel Home Design
OE
I/
Z
CA
iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiNiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii6iiiiiiiiiiiiiiiiii ililliiiii
1 E11 ir "ffipmTahaparawallataaailaaaaarawanainamanamaaaaaaaa:wanaaaaaaanaliaanawa .""..laall'aiia'a'aaaliaa'iaraiiaiaigaFaa'aaaaaaliti-
iaaa
a a
1 1 1 111 1 1 MI MS
r-- itil al iii
I No
Bo
m
—I ow
m al
ow mit
I 1
12
By RF
Date 1/2006
Job No 2088
2ND FLOOF LINE
SCALE 1/4
1/4
VA" OE
CT
1ST FLOOR LINE
Sheet No 3
715
egaiteit.
Designs Engineering, Inc
Project Lexington -3Car
File #91096B- 110D -D2 WA
Client Suntel F-Iome Design
SPACE ROCF WTI-1G FASTENERS AT 6 OZ. AT ALL INTERMEDIATE
FRAMING ?E?-I ERS EACH- SIDE OF EACH RIDGE, NIP AND WITHIN
I A 5' -0' WIDE NAILING ZONE AROUND 11-E ENTIRE PERIMETER OF
THE HOUSE (NAILING ZONE WIDTH STARTS AT EDGE CF ROOF)
r)
By RF
Date 1/2006
Job No 2088
Sheet No
J
'eg
Designs Engineering, Inc
Project Lexington -3Car
File #91096B-110D-D2 WA
Client Suntel Home Design
Li I
V
If
ft
11
F
By RF
Date 1/2006
Job No 2088
LI
0
Sheet No
Sy /5
Designs Engineering, Inc
--frcammagEmb
I r
Project. Lexington 3Car
File #91096B-110D D2-WA
Client. Suntel Home Design
B) RF
Date 1/2006
Job No 2088
Sheet No 40)
Designs Engineering, Inc
WIND ANALYSIS USING 2003 IBC SIMPLIFIED WIND METHOD
Data.
W Total Wind Force Y x Ix P x A
Y• =161 I =10
FRONT REAR WALLS
SIDE WALLS
Zone Horizontal Pressure
A Pa 21 6 psf
B Pb 14 8 psf
C Pc 17.2 psf
D Pd 11 8 psf
W Y I (Pa Aa Pb Ab Pc Ac Pd Ad) W 1 76 x 10 pounds
Distribute wind force to roof and second -floor level
FRw1 Y I (0 5 Pa Aa 1 0 Pb-Ab 0 5 Pc Ac 1 0-Pd Ad) FRw1 8 78 x 10 lbs
F2w1 Y I (0 5 Pa Aa 1 0 Pb Ab 0 5 Pc Ac 1 0-Pd Ad) F2w1 8 78 x 10 lbs
Zone
Project. Lexington 3Car By RF Sheet No
File ##91096B- 110D -D2 WA Date 1/2006 (/5
Client. Suntel Home Design Job No 2088
Reference 2003 IBC Figure 1609 6.2 1
Projected Area
Aa• =115
Ab 0
Ac 490
Ad 0
Horizontal Pressure Projected Area
sq ft.
sq ft.
sq ft.
sq ft.
A Pa 21 6 psf Aa 85 sq ft.
B Pb 14 8 psf Ab 50 sq ft.
C Pc 17.2 psf Ac 895 sq ft.
D Pd 11 8 psf Ad 255 sq ft.
W Y I (Pa Aa Pb-Ab Pc Ac Pd Ad) W 3.38 x 10 pounds
Distribute wind force to roof and second -floor level
FRw2 Y I (0 15 Pa Aa 1 0 Pb-Ab 0 15 Pc Ac 1 0 Pd Ad) FRw2 1 02 x 10 lbs
F2w2 Y I (0 85 Pa Aa 0 0 Pb-Ab 0 85 Pc Ac 0 0 Pd Ad) F2w2 2 36 x 10 lbs
Designs Engineering, Inc.
SEISMIC ANALYSIS USING 2003 IBC SIMPLIFIED ANALYSIS PROCEDURE,
Data. 1 =1 0 Sd 1.30 R 6 5 r 0 45 (worst case)
E Earthquake Base Shear 1.2 p Qe 1 4 1.2 p (Sd W/ 1 4R)
Weights
Mass Calculations
Roof Dead Load 15 psf (Composition Roof Covering)
Floor Dead Load 10 psf
Partitions 10 psf
Exterior Walls Windows 10 psf (Average)
Aroof 1150 ft ^2
A2ndFloor 950 ft^2
AlstFloor 1800 ft^2
h2 21 ft
Mroof 20•Aroof 10 Aroofwall
M2 20 A2ndFloor 10•A2wall
20
p• =2—
r•V A2ndFloor
E 1 2 p• 1 4dR (Mroof M2) E 1 08 x 10 pounds
Distribute Seismic Shears
D =Mroof h2 M2 hl
FRe Mroof h2
E
D
M2 hl
F2e D E
Project. Lexington -3Car By RF Sheet No 8
File #91096B -11 OD -D2 WA Date 1/2006
Client. Suntel Home Design Job No 2088
Aroofwall 700ft ^2
A2wall 1400 ft^2
Alwall 0 ft ^2
hl 10ft
Mroof 3 x 10 pounds
M2 3 3 x 10 pounds
p if(p 1 1 ,p) p 1
D= 96x10
FRe 7 09 x 10 pounds
F2e 3 71 x 10 pounds
Designs Engineering, Inc
Project. Lexington 3Car
File #91096B- 110D -D2 -WA
Client: Suntel Home Design
By RF Sheet No 9/
Date 1/2006
Job No 2088
INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH
Analyze entire brace wall line as a series of perforated shearwall panels using worst -case "maximum opening
height ratio Individual perforated shearwall panels extend between plan discontinuity Overturning for such
panel is calculated by rational analysis Reference Section 2305.3 7.2 2003IBC
Unadjusted in -plane shear force for brace wall line, FRe 2950#
Percent full- height sheathing 8 ft. 16 ft 50%
Maximum opening height ratio 4ft 8 ft 0 50
Shear resistance adjustment factor, Co 0 8 (Ref Shear resistance adjustment factor table)
Amplified in -plane shear, V Unadiusted shear force for brace wall line
'Shear resistance adjustment factor x Total length of full- height walls
FRe (Co x L) 2950# (0 8 x 8 ft) 460 plf
Uplift at perforated shearwall ends calculated based on rational analysis (use only 50% of weight
of first individual full- height wall segment for dead load)
2/3 average weight of full- height wall segments and portion of roof framing, Wd 110 plf
2/3 dead load reaction at end of shearwall or corner restraint, Rl 400#
Uplift at end of perforated shearwalls, Pu Vf x hl Wd x (0 5 L1) R1
460 plf x 8 ft 110 plf x (0 5 x 4ft) R1 3100#
Uplift between wall ends, t V- Wd 460 plf 110 plf 350 plf
Wall bottom plate (1 1/2" thickness) to rim joist.
Use 16d common nails (0 162 by 3 1/2 inches)
Lateral resistance 1 33 x 141# 187# per nail
Withdrawal resistance 1 33 x 40 ph x 2.5" 133# per nail.
Nails for shear transfer 460 plf 187# per nail 2 4 nails per, foot
Nails for uplift transfer (460 -110 plf) 133# per nail 2 6 nails per foot
Net spacing for shear and uplift 4" o c
Net spacing for shear using LTP5 clip and 16d toenails at 8" o c 630# (460- 150 24" o c
Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor
wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced
moments and shears. Continuity of load path is provided by holdowns at ends of the perforated shear wall.
Use Tvne "C" shearwall w/ HTT22 holdowns, 16d at 2 1/2" o.c. sole plate nailing and LTP5 clips at 24" o.c
Rim joist to wall top plate
Use 16d common nail (0 162 by 3 1/2 in.) toe nailed to provide shear transfer
Lateral resistance 0 83 x 187# per nail x 1 5 nails per ft. 230 plf (150# per nail default maximur
for seismic loads) plus Simpson "LTP5" framing clip capacity 630#
Designs Engineering, Inc
RI 400°
FRe 2950°
HOLDOWN
Pu 3100°
4 -0'
P.S.W. Segment.
WALL HEIGHT
Percent Full Height Sheathing
10% L0
20% 1.0
30% 1.0
40% 1.0
50% 1.0
60% 1.0
10% 1.0
80%
Project. Lexington -3Car
File #91096B- 110D -D2 -WA
Client: Suntel Home Design
Perrorated Shear UJall
ELEVATION OF PERFORATED S.
MAXIMUM OPENING HEIGHT FA NO !O AND
H/3
2' -5'
4-1/2
4/ -0'
Shear Res stand
0.69
011
014
011
0.50
0.53
0.51
0.91
Hi 3
05
o.56
0.59
0.63
0.61
011
011
0.83
SHEAR RESISTANCE 4DJUSTME
4 -0'
P.5.W. Segment
By RF
Date 1/2006
Job No 2088
•1
S
EARUJALL
HEIGHT
2H /6 H
8 -0
or
043 0.36
045 0.38
049 042
0.53 045
0.51 0.50
0.63 0.56
0.69 0.63
011 011
\T FACTOR
Sheet No /0/
Designs Engineering, Inc
INVESTIGATE UPPER -FLOOR SHEARWALLS
Line "A"
Rear Walls
Line "B"
Front Walls
Summation of full- height walls lengths L 23 ft.
Total length of brace wall line TL 35 ft.
full- height sheathing S L 100 S 65 71 percent
TL
Diaghragm stress v 0 5 v 125 49 p.lf
TL
Shearwall stress v 0 5 FR
L
Uplift for shearwall length L1 3 ft.
(worst case)
Pu =v8– 5WdL1 –R1
Use Tvne "B" Shearwall w/ no holdowns
Summation of full height walls lengths
Total length of brace wall line
full height sheathing S L 100 S 42 86 percent
TL
Diaghragm stress v 0 5 FR v 125 49 plf
TL
Shearwal] stress v 1 1 0 5 FRe 259 88 plf
(Seismic) L
Shearwall stress v 0 5 F v 292 81 plf
L
Project. Lexington -3Car
File #91096B- 11.0D -D2 WA
Client: Suntel Home Design
Uplift for shearwall length L1 2 ft.
(worst case)
Pu v 8 5 Wd Ll R1
Use Tvae "B" Shearwall w/ MSTC40 holdowns
By RF
Date 1/2006
Job No 2088
v 190 96 plf
Weight Wd 220 plf
Ri 660
Pu 537 68 pounds
L =15 ft.
TL 35 ft.
Weight Wd 160 plf
R1 400
Pu 1 78 x 10 pounds
Sheet No
Designs Engineering, Inc
INVESTIGATE UPPER -FLOOR SHEARWALLS.
Line 1 Walls
Line 2 Walls
Project. Lexington -3Car
File #91096B- 110D -D2 -WA
Client. Suntel Home Design
Summation of full height walls lengths L 24 ft.
Total length of brace wall line TL 27 ft.
full height sheathing S L 100 S 88 89 percent
TL
Diaghragm stress v 0 5 FR v 188 83 plf
TL
Shearwall stress v 0 5 FR v 252 9 plf
0 84•L
Uplift for shearwall length L1 8 ft.
(worst case)
Pu• =v8— 5WdL1 —R1
Use Tune "B" Shearwall w/ MSTC40 holdowns
Summation of full height walls lengths
Total length of brace wall line
full height sheathing S L 100
TL
Diaghragm stress v 0 5 FR
TL
Shearwall stress v 0 5 FR
L
Uplift for shearwall length L1 27 ft.
(worst case)
Pu =v8— 5 WdLl —R1
Use Tvne "B" Shearwall w/ no holdowns
By RF
Date 1/2006
Job No 2088
Weight Wd 110 plf
Rl 400
Pu 1 18 x 10 pounds
L 28 ft.
TL 28 ft.
S 100 percent
v 182 09 plf
v 1.82 09 plf
Weight Wd 110 plf
R1 400
Pu 428.29 pounds
Sheet No /e2
15
Designs Engineering, Inc
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Rear Walls
Line A
Front Walls
Line B
Project Lexington 3Car
File #91096B- 110D -D2 -WA
Client. Suntel Home Design
Uplift for shearwall length Ll 2 ft.
(worst case)
Pu v 9 5 Wd L1 R1
Type "B" Shearwall w/ HTT22 holdowns
By RF
Date 1/2006
Job No 2088
Summation of full height walls lengths L 22 ft.
Total length of brace wall line TL 64 ft.
full height sheathing S TL 100 S 34 38 percent
F2w1
Diaghragm stress v 0.2 v 27 45 plf
TL
0 5 FRw1 0 5 F2w1
Rim /blocking stress v v 137.25 plf
TL
Seismic Shearwall v 1 15 (0 5 FRe 0 5 F2e) v 282.27 plf
stress w/ wall aspect L
ratio penalty
0 5 FRe 0 5 F2e
Shearwall stress v v 245 45 plf
L
Weight Wd 110 plf
RI 400
Pu 1 7 x 10 pounds
Summation of full- height walls lengths L 16 ft.
Total length of brace wall line TL 64 ft.
full height sheathing S T 100 S 25 percent
F2w1
Diaghragm stress v 0.2 v 27 45 plf
TL
0 5 FRw1 0 5 F2w1
Rim /blocking stress v v 137.25 plf
TL
Seismic Shearwall 1 15 (0 5 FRe 0 5 F2e) v 388 13 plf
stress w/ wall aspect L
ratio penalty
0 5 FRe 0 5 F2e
Shearwall stress v v 337 5 plf
L
Uplift for shearwall length L1 2 ft. Weight Wd 110 plf
(worst case) R1 400
Pu v 9 5 Wd Ll Rl Pu 2 53 x 10 pounds
Use Type "C" Shearwall w/ HTT22 holdowns AND Garage Frame Detail
Sheet No A9
/1s
Designs Engineering, Inc.
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Line 1 Summation of full height walls lengths
Total lenrth of brace wall line
Line 2
Project: Lexington -3Car
File #91096B- 110D -D2 -WA
Client: Suntel Home Design
full- height sheathing S L 100 S 55 56 percent
TL
F2w2
Diaghragm stress v 0.25 TL v 218 33 plf
Rithfblocking stress v
Shearwall stress v
Rim/blockm.g stress v
Shearwall stress v
0 5 FRw2 0.25 F2w2
TL
0 5 FRw2 0.25 F2w2
L
Uplift for shearwall length L1 8 ft.
(worst case)
Pu• =v9— 5WdL1 —R1
]I'vne "E" Sh.earwalls w/ PHD6 holdowns
By RF
Date 1/2006
Job No 2088
L•= 15 ft.
TL 27 ft.
Summation of full height walls lengths L 29 ft.
Total length of brace wall line TL 31 ft.
full height sheathmg S L 100 S 93 55 percent
TL
F2w2
Diaghragm stress v 0.35 v 266.22 plf
TL
0 5 FRw2 0 5 F2w2
TL
0 5 FRw2 0 5 F2w2
L
Uplift for shearwall length L1 3 ft.
(worst case)
Pu• =v9— 5WdLl —R1
Tube "D" Shearwalls w/ HTT22 holdowns
v 407 16 plf
v 732 89 plf
Weight Wd 110 plf
R1 400
Pu 5 76 x 10 pounds
v 544 78 plf
v 582.35 plf
Weight Wd 110 plf
R1 400
Pu 4 68 x 10 pounds
Sheet No
Designs Engineering, Inc
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Line 3
Project. Lexington -3Car
File #91096B- 110D -D2 -WA
Client: Suntel Home Design
Summation of full- height walls lengths L 23 ft.
Total length of brace wall line TL 23 ft.
full height sheathing S L 100 S 100 percent
TL
F2w2
Diaghragm stress v 0.25 v 256 3 plf
TL
Run/blocking stress v 0.25 F2w2 v 256.3 plf
TL
Shearwall stress v 0.25 F2w2 v 256 3 plf
L
Weight Wd 110 plf
Uplift for shearwall length L1 22 ft.
(worst case) R1 400
Pu v 9 5 Wd L 1 R1 Pu 696 67 pounds
Type "B" Shearwalls w/ no holdowns
By RF
Date 1/2006
Job No 2088
Sheet No /s'
Architecture Engineering, Inc
0
El
El
El
0
0
10
Project. Structural_Notes_.__
Location Pacific Northwest
Copyright 1993
OWNERSHIP OF DOCUMENTS
The "diamond" shearwall designation system details were created by
Fuller Architecture Engineering, Inc (FAE) and are copyright protected
property of FAE and shall not be used unless issued from FAE
Copyright 1993
LEGEND
DRAWING NOTES
SIMSPON 'HU" TYPE BEAM HANGER
SIMPSON GLB' TYPE BEAM HANGER
DESIGNATES GRID LINE
DESIGNATES DETAIL MARK
DESIGNATES SHEARWALL TYPE
DESIGNATES HOLDOWN TYPE
(SEE SHEAR SCHEDULE)
T
G PERFORATED SHEARWALL
SEE DETAIL #30
DESIGNATES DRAWING NOTE
1
DESIGNATES H.D. LOCATION (APPROXIMATE)
SIMSPON 'HUxx TYPE BEAM HANGER
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'EPC' TYPE POST CAP
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'ECC' TYPE POST CAP
(3) 2 x (WALL WIDTH) BUNDLED STUDS TO SUPPORT ROOF FRAMING ABOVE.
SIMPSON 'MSTC52" FASTENED TO `DBL. JOISTS OR BEAM. SEE DETAIL 6
(2) STUDS UNDER BEAM CONTINUOUS DOWN TO FOUNDATION.
By'._ RE
Date 1/2007
Job No 7000
DOUBLE FLOOR JOISTS. NAIL FLOOR SHEATHING TO EACH JOIST WITH (2) ROWS
10d COMMON NAILS AT 6' O.C.
A 'DRAG SHEAR TRUSS' DESIGN TRUSS FOR 150 PLF DIAPHRAGM SHEAR.
TRANFERRED FROM TOP TO BOTTOM CHORDS THROUGH THE WEB MEBERS WITH CUMULATIVE
FORCE RESISTED AT ONE END OF THE BOTTOM CHORD
Sheet No
Architecture Engineering, lnc
SHEARWALL SCHEDULE
MARK WALL COVER FASTENERS
6d WALLBD
NAIL OR 1
'W" 0 6 SCREW
1/16" A.PA. I6GA STAPLE
RATED SHT'G0131 "m x 2
5/8 G.W.B.
0.148'4 x 2
1 /I6 A.PA. 0.131'4 x 2
RATED 51-IT'G 0.148 x 21/4" 4" O.G.
F RH. P -NAIL
0.148 x 2 3" O.C.
FULL ROUND- STAGRD
HEAD P -NAIL
0.1484'x2
FULL ROUND- 4 O.C.
HEAD P-NAIL,
1/16 A.PA.-
RATED SHT'G
1/16 A.PA.
RATED SHT'G
EACH SIDE
F 1/16 A.PA.
RATED SHT'G
EACH SIDE
1-+OLDOWN Sc4EDULE
"X" DESIGNATES SIMPSON PRODUCT
MARK I HOLDOWN I FASTENERS
NO
HOLDOWN
REQUIRED
'MSTC40'
2 j 'MSTC52
'MSTC66
'CMST12"
\4/ 9 -0 "LONG
A 'PHD -5
-OR
'HDU -4
'HTT22
\6/ -OR
"HDU -5
'PHDS
'HDU -8
-OR
10
'HDQ -8
0.148'4'x2144' 2 O.C.
FULL ROUND- STAGRD
HEAD P -NAIL,
(IS) I6d SINKER
NAILS AT EACH END
(24) 16d SINKER
NAILS AT EACH END
(34) 16d SINKER
NAILS AT EACH END
(43) 16d SINKER
NAILS AT EACH END
SIMPSON "SSTB24"
SIMPSON 'SSTB24
SIMPSON `SSTB28
SIMPSON 'SSTB28
(15)(16) SIMPSON 'SSTB28"
"HDU 11' or W/ 9/64 CUT WASHER
'HHDQII 4 HEAVY HEX NUT
(15)(16) 1" DIA. (A35) GALV
'H1„ID014 ROD EMBED 8 INTO
12" TI-K. x 21" WIDE
10' -0' LONG FTG,
DESIGNATES SHEAR PANEL
AND HOLDOWN TYPE.
DESIGNATES APPROXIMATE
HOLDOWN LOCATION
Project. Structural Details
Location Pacific Northwest
Copyright 1993
g PANEL INTERN.
EDGES STUDS
3" O.C. 1 12 O.C.
12" O.C.
NOTES
SOLE (5)
PLATE
4" O.C. 4" O.C. I6dg 8 oc
3 0.0 6 0.6 1 I6d 312 00
4' O.C. -1 12 O.G. STAGRD
6 O.C.
I6dg 2 oc
STAGRD
I6dg 31/2 "oc
STAGRD
12" D.C 16.0149 2 oc
STAGRD
12 O.C. 16de 1 "oc
STAGRD
I6d TOENAILS
AT 8" O.C.
(3)
LTPS'g 48" oc
(3)
"LTPS'g 24" oc
(3)
'LTPS "g 15 oc
(3)
"LTPS 'e 10' oc IS O.C.
(3)
"LTPS 'e 6 oc 12" O.C.
REFERENCES TO SEE NOTES ABOVE
By RI Sheet No
Date 1/2007
Job No 7000
ALL PANEL EDGES
MUST BE BLOCKED
BLOCKING/ (9) 5 4 "s x 1 REMARKS
RIM JOIST EMB. ABs
48" O.G.
11/2 LONG x 1 /I6 WIDE
STAPLES W/ CROWNS
PARALLEL W/ FRAM'G.
DBL. STUDS/BLKG. AT (5)
IS" O.G. ADJOINING PANEL EDGES
W /16dAT4 0.0
DBL. STUDS/BLKG. AT (5)
10" O.C. ADJOINING PANEL EDGES
W /16dAT4 O.C.
DBL. STUDS/BLKG. (8)(11)
g ADJOIN'G PANEL EDGES
W/ I6d AT 4 d 3X MUDSILL
3X. MUDSILL AND (8)(11)
3X. STUDS/BLKG. AT
ADJOINING PANEL EDGES
PER NEW CODE, ALL ANCHOR BOLTS MUST
HAVE 2 SQUARE X 3/16 HDG PLATE WASHERS
48 O.C.
1. ALL FASTENERS USED AT THE COAST AND IN CONTACT WITH PRESSURE
TREATED MATERIAL MUST BE HOT DIPPED GALVANIZED (HDG)
2. "F RH. P- NAIL" DESIGNATES A FULL ROUND HEAD PNEUMATIC- DRIVEN
NAIL (lad GALV BOX NAILS MAY SUBSTITUTE FOR 0.1484 P NAILS)
3 SIMPSON "RBC BOUNDARY CLIPS TO SUBSTITUTE FOR `LTPS AT ROO
4 SHEATHING ON SHEARWALLS MUST EXTEND DOWN TO SOLE 4 MUDSILL
PLATES AND SHALL NOT BE INTERRUPTED BY ANY WALL BUTTING INTO
THE SHEARWALL.
5 PROVIDE DOUBLE STUDS/BLKG. WI I6d AT 4" O.C. AT ADJOINING PANEL
EDGES TO AVOID SPLITTING, NAIL EACH PANEL EDGE TO ONLY ONE 2X.
6 'SIMPSON" PRODUCTS SHALL BE INSTALLED AS PER MFG. SPECS
1. HOLDOWNS OCCUR AT ENDS OF SHEAR -WALLS AND SHALL FASTEN
TO A MINIMUM OF (2) STUDS (MIN.) LAMINATED TOGETHER W/ I6d AT 6 o.c.
8 USE LONGER FDN. BOLTS WITH 3X MUDSILL AND SET BOLTS HIGHER.
DO NOT INSTALL FDN. VENT WITHIN 12 CLR. OF A HOLDOUJN ANCHOR BOLT
9. FASTENERS SPACING APPLIES ONLY AT FULL HEIGHT WALL SEGEMENTS
OTHERWISE USE MINIMUM CONSTRUCTION STANDARDS
10 ANCHORS SHALL HAVE MN 13/4 EDGE DISTANCE 4 5 END DISTANCE.
11. WALLS WITH PLYWOOD ON EACH SIDE SHALL OFFSET PLYWOOD EDGE
JOINTS ON ONE SIDE OF THE SHEARWALL FR .OM THOSE ON THE OTHER.
EXTEND PLYWOOD THROUGH CORNER A5 SHOWN IN DETAIL 14 TO
ACHIEVE MINIMUM SHEARWALL WIDTH SHOWN ON PLANS
12. SHEARWALLS WITH OVERDRIVEN NAILS PENETRATING SURFACE BY MORE
THAN 1/8 WILL SE REQUIRED TO BE RENAILED USE A RUBBER
GROMMET IN HEAD OF NAIL -GUN AND ADJUST AIR PRESSURE SO NAIL
HEADS ARE FLUSH WITH OR SLIGHTLY RECESSED INTO SHEATHING.
13. ALL STUD WALLS MUST HAVE DOUBLE TOP PLATES W/ I6d AT 8 O.C.
AND STUDS 16" o.c. PLATES SHALL LAP A MINIMUM 4 -0" AT SPLICES
WITH AT LEAST EIGHT 16d NAILS EACH SIDE OF SPLICE
14 HOLDOWN TYPES W/ GREATER NUMERICAL DESIGNATION MAY
SUBSTITUTE FOR HOLDOWNS WITH LESSER. SEE CHART TO THE LEFT
15 USE 3000 PSI CONCRETE IN STEMWALL. PROVIDE (2) CONT T 4 5
IN STEMWALLS WITH THESE HOLDOWNS. EXTEND 10' 0" PAST HOLDOWNS
16 FASTEN TO (4) 2x5 FULL HGT STUDS FASTEN EACH STUD TOGETHER WI
(2) ROWS I6d AT 5" O.G. STAGGERED EDGE NAIL WALL PLY TO EA. STUD
IN SHADED AREAS FASTEN SHTHG. AT 4 O.G. AT BOUNDARIES OF
SHADED AREA AND PANEL EDGES BLOCK PANEL EDGES W/ 2
NOMINAL FLAT BLOCKING. USE S COMMON NAILS FOR ROOFAND
d. lad AT FLOORS /CLGS USE 5/8 055 OR PLY SHTHG. AT CEILINGS
I -12 -4'1
.1
Architecture Engineering, Inc
APA -RATED
ROOF SHEATHING
BOUNDARY
NAIL (BN.)
2 X SOLID
FRIEZE BD
2 X STUD WALL
ED
10d e 4 O.C.
SIMPSON 'LTP5'
SEE SCHEDULE
FOR SPACING
SHEARWALL
O
EXTEND WALL
SHTI -IG DOWN
TO TOP WALL
PLATE 4 EN.
EDGE NAIL (EN)
SEE NOTE
BELOW
PLY. SPLICE PT.
EDGE NAILING
SIMPSON 'LTPS'
RECOMMEND
USING 'DRY'
LUMBER RIM
JOIST OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
ROOF FEiR TER
THIS DETAIL ALWAYS APPLIES.
SIMPSON 'H1' TIE AT
EACH RAFTER ALONG
ENTIRE PERIMETER
NOTE. "I-110 -2' MAY
SUBSTITUTE FOR 'Hi'
NOTE: SIMP 'I -125' MAY
SUBSTITUTE FOR 'HI' AS
LONG AS "RBC' CLIPS AT
24 o.c. ARE USED TO
CONNECT THE FRIEZE BD
TO TOP WALL PLATE.
10de 4 O.G.
PLYWOOD
DECK SHEATHING
JOIST
I----2 X BLOCK'G
EA. SIDE to 45'
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS'
APA -RATED
SHEATHING
,JO IST /S+- 1EARWALL
7 SOLE PLATE
NAIL SEE
SCHDE FOR INFO
(4) 10d EA. BLK.
FLOOR JOISTS
2 X BLOCKING AT
6 -0' O.G W/ (3) I0d
TOENAILS TO PLATE
2 X STUD WALL
APA-RATEP
SHEATHING
0 PARALLEL JOISTS
THIS DETAIL ALWAYS APPLIES.
Project. Structural Details
Location. Pacific Northwest
Q Copyright 1993
APA -RATED
ROOF SHEATHING
By -RU
Date 1/2007
Job No 7000
Sheet No
RAFTER OR
TRUSS —EN.
Sd as 4' O.C. FLOOR
2 X SOLID BLKG.
W/ SIMPSON 'L550" SHTH'G.
2 X 6 FLAT BLK'G
W/ 16d e 4 O.G.
INTO WALL tE
SHEARWALL
PLYWOOD
5HEATHING
I0d 4 O.C.
SOLID .BLK'G.
SIMPSON 'LTPS'
SEE SCHEDULE
FOR SPACING
O
END OF
2X WALL
16de 8'oc.
2"
2X BLKG. W/
16d AT 6 O.C.
EN.
—1/2' SIHTHG W/ 10d AT 4 O.G.
EDGES, BLOCK EDGES.
SEE SIH'WALL SCHEDULE
FOR ADDITIONAL INFO
2 X STUD WALL
STRUCTURAL CE IL INCA
R,4C STRUT
SOLID BLK'G.
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS
JOIST
SHEARWALL
APA -RATED
SHEATHING
J /SI— IEAIRWALL
I0d 6 O.C. AT FLOOR
AT DSCR, PROVIDE 2x4
x 5 -0' LONG NAILED TO
BOTTOM CHORD W/ 16d AT
4 O.G. STAGGERRED
PREDRILL HOLES FOR
CONNECTOR SCREWS
END OF 2x4 l
4 DRAG STRUT T I I I I T I I I Ir l 1
I L
SOLID BLKG.
EA. SIDE 5 -0'
AWAY FROM END
OF DRAG STRUT
CONNECTOR SEE PLAN
FOR SIZE. INSTALL WI
EQUAL LENGTH TO DRAG
STRUT AND WALL.
T,FTG.
gaiter
Architecture Engineering Inc
rJI
1
FRAMING I
•4 CONT HORIZ� lr
AT TOP 4 BOTTOM 11
II
11r
n
CONC. STEM WALL
J
In
e ,N WALL
BH t'OND
DE 18 "I4C—
AT EN OF
WALL INF
SOLE PLATE
NAILING SEE
SCHEDULE
EDGE NAIL SIDE WALL
SI-ITH'G TO 4x6 STUD
.1
4' -0
NORMAL JOIST
THIS DETAIL ALWAYS APPLIES.
(12) I6cf-
i
I, I MIN. FLY WIDTH 1 1,
EA. sIDE I' 10"
.1
I'
I
I
it
I I
I
4 -0"
SIMPSON "MSTC28'
EA. SIDE (4 TOTAL)
Project. Structural Details
Location Pacific Northwest
Q Copyright 1993
4PA RATED
SHEATHING FASTENED
TO MUDSILL PLATE
EDGE NAIL (EN)
SIMPSON 'LSSO" ANCHOR
(NOT REQ'D IF 514TH'G
EXTENDS CONT TO MUDSILL
W /OUT ANY JOINTS)
EDGE NAIL (EN)
x T' EMS. AB'•
W/ 2 X 2 X 3/16
PLATE WASHERS OR
SIMP "BP 5/8 -2
•4 DOWELS 48" O.C.
(MINIMUM)
e GARAGE -FRAME DETAIL,
NOTE
EXTEND GARAGE
DOOR HEADER
OVER ENDWALL.
HEADER WIDTH TO
MATCH WALL WIDTH
NAIL SHEATHING TO
HEADER WI 0.148 x
2 F RI-I. P -NAILS
3 O.G. BOTH WAYS
4x6 STUD EA. END
W/ ADD'L 2X NAILER
CORNER WI 16d 6
C-ARAGE.
APA -RATED SHTH'0
FROM A SINGLE SHEET
BOTH SIDES W/ 0.148
F RH. P -NAILS INTO
4x6 W/ (2) ROWS AT 2" oc.
EXTEND PLYWD.
CORNER SEE DET 14
6X SOLID BLOCKING
AT SHEATHING SPLICE
SIMPSON 'PI-4D6
4x6 PLATES W/ (2) 5/5" +X12"
J -OLTS AT 5" o.e. WI
I B
GIMP 'BP%5" WASHER-5
f it (2) ROWS OF NAILS AT 11/2"
STAGGERED TO MUDSILL
n 11
I II ii 1
SIMPSON 'LTP4 EA. END'
•4 HAIRPIN BAR x 1 -4
2 -3 n
ti 11 I -I
:t .r 8" CONCRETE WALL W/
I I r (2) 0 4 DOWELS EA END UND :R SHEARWALL
(2) 0 4 X 1 -6 5 0
12" So. CONT FTG.
W/(2)•4T4B
24 "x "X 12" FTG.
W/ (3) •4 CENTERED
BELOW RAISED STEMW4LL
(4) I0d 3 0.C.—
PLYWOOD
DECK. SHEATHING
T II1111
II
.11• ft
11 tut
II
r
IF FLOOR JOIST I
SYSTEM, PROVIDE
2 X BLOCKING
12" O.G. WI (3)
10d TOENAILS
TO PLATE
i t
CONC. STEM WALL
PARALLEL JOIST
THIS DETAIL ALWAYS APPLIES.
PONYWALLS 4' -0' AND TALLER MUST BE
APPROVE BY ENGINEER OTHERWISE OK
By RI=
Date 1/2007
Job No 7000
I: I'
•1 I
:PO01•F) TO'•N aVE
TYPE "C .SHEA
•fEG1S.IIREFIENTS e
#Ip
II p r.-- .51MPSON 'STAB BOLT
II gII
•4 CONT T t g II ¢U•
•(MINIMUM) •ll
It
:II'
j- llCONGRETE FO(JNDATIOIJ 11
W
r -e
0 4 DOWELS 48" ac,-
"PA RATED
SHEATHING..
Sheet No
SOLE PLATE
NAILING
EDGE NAIL (EN)
SIMPSON "L550" AT
SAME SPACING AS 'LTP5
EDGE NAIL (EN)
•d CCNT HORIZ T 4 B
6 x 1" EMS. A5'6
W/2 X2 X 3/I6
PLATE WASHERS OR
SIMP 'BP 5/8 -2'
•4 DOWELS 48 O.G.
MIN. (2) 2X6 STUDS AT
HOLDOIINS EDGE
NAIL PLY TO STUDS
PROVIDE SOLID WOOD
1 1OLDOtI.N STUDS
SIMPSON
IaOLDOILN
A36 THREADED
ROD WITH SAME
DI R AS
ANC R BOLT
SIMPSON 'CAW' COUF'LEP
IOLDOWN e fi ONYWALL
Architecture Engineering, Inc.
WALL
SHEATHING
EDGE NAIL
SHEATHING
EDGE NAIL
PLY TO
HOLDOUJ
STUDS
RUN PLY.
CONT TO
BOttoM a
(2) -2 X 6
BLOCK'G
IF BEAM IS
UPTURNED USE
2x6 LEDGER
WI I6d AT 6" cc
STAGG'RD
RIM JOIST
JOIST
SIMPSON "LTP5"
SEE SCHEDULE
FOR SPACING
2 X STUD WALL
APA -RATED
WALL SHEATHING
LAM. STUDS
TOGETHER W/
I6d AT 6 O.C.
SEE PET n SEE PLAN IF PLYWOOD
IF BM EXTENDS CEILING IS REQUIRED
BELOW CEILING FASTEN RAFTER TO WALL
PLATE W/ SIMPSON 'HI"
SEE DET I FOR ADD'L INFO
SOLE PLATE
NAILING
BOUNDARY
NAIL
CANTILEVER JST
r SOLID BLK
SIMPSON 'L550"
MAY SUBSTITUTE
FOR 'LTP5'
L—
I I •n B �N•I -mac. 4; O (A3b) THREADED' RbDI 0 d
ui
'L-W' on W/. SIMPSON. 'S<rT" ADHESIVE. J11:
-W' (SPECIAL.INS
II REQUIRED BY CODE)
II'
11 CONCRETE FOUNDATION:
Project. Structural Details
Location. Pacific Northwest
Oc Copyright 1993
ANCHOR EMBED
DIAMETER DEPTH
5/8" I 10'
3/4" I II"
7/8" I 13"
HOLDOWN
GRADE A36'
THREADED ROD
SEE SIMPSON
CATOLOG FOR
DIAMETER
rj
M... AN`.:G I— IOLDOUJN ANCHOR
BOUND NAIL ROOF PLYWD. TO
2 X 10 LEDGER W/ BEVELED
TOP TO MATCH ROOF SLOPE.
NAIL LEDGER W/ (2) -I6d EA
WALL STUD 4 EA 2 X 6 BLK'G.
(USE 2x 8 BLKG. IF TRUSS ROOF)
FOR THIS SECTION OF ROOF
BLOCK PANEL EDGES W/ 2 X 4
FLAT NAIL 8d 4" O.G. EDGES
AND BOUNDARIES, 12" O.C. IN FIELD
SHEARWALL PLYWD. MUST EXTEND
DOWN TO BOTTOM WALL PLATE
lT\
ROOF LEDGER DETAIL
APA -RATED
WALL
SHEATHING
(2) -2x OR
4x (REF.TO
PLANS)
HOLDOWJ
STRAP WRAP
AROUND DBL
JOISTS
SIMPSON
'1. 17530'
EA. SIDE OF
DBL. JOISTS
(PROVIDE WEB
STIFFENDER IF
I -JOIST USED)
IF THIS IS A SI- I'WALL
W/ A INOLDOU.N,
THEN EXTEND 5HTH'G
THRU 4 EDGE NAIL
NOTE.
THIS DETAIL IS REQ'D
ONLY WHEN TWO J_
SHEARWALLS SHARE
ONE HOLDOWN.
8d AT 6" o.c.
AT ALL FRAMING
MEMBERS WITHN
5' -0' OF EDGE
GABLE END TRUSS
NAILS BASED
ON SHEARWALL I_I
REQMTS. BELOW
EITHER NO
JOINT IN PLYWOOD
OR
FASTEN 5HWALL TO
ENDWALL TRUSS WI
BLOCKING/RIM
FASTENERS SHOWN
IN 51•I'WALL SCHD'L.
SH'WALL SEE
SH'WALL SCHEDULE
FOR NAIL'G REQMTS.
By RP
Date 1 /2007
Job No 7000
SOLE PLATE
NAILING
BOUNDARY
NAIL
Sheet No
5
,SOLID BLKG.
CONY RIM 4 SIMPSON 'LS50' SUBSTITUTE
JOIST
2X BLKG. OR FOR 'LTPS'
D= RIM JST
(12) 10d
EA. END
OF STRAP
(2) I6d EA TRUSS
2x4 x 8' -0" LATERAL
BRACE AT 6 -0' o.c.
(6) I6d NAIL
DBL. JOIST AT
EACH END OF WALL
OVER DBL. STUDS
FASTEN TO RIM JOIST
W/ SIMPSON 'LW'
4x6 OR
(2) 2X STUDS
NOLDOUJN TO RIM JST
I6d AT O.C.
HOLDOUN
I6d AT 6 O.C.
INTO EA. STUD
inl
HOLDOUN
FRAMING AT CORNER
EDGE NAIL
2x4 FLAT AT 24' O.G.
IN END -WALL TRUSS
Sl 1 T 14 G 2X VERTICAL BRACE
(2) 10d AT 8' OD.
2x4 BLKG. AT 6 -0' O.C.
W/ 8d AT 3 O.C.
F
TRUSS BOTTOM CHORD OR CEILING JOIST
DBL. 2xSOLID BLOCK
W/ (2) SIMP 'LS50"
TO WALL PLATE
2x6 PLATE W/ I6d
AT 12' oz. TO WALL
GYPSUM BOARD
DIAPHRAGM WITH
5d COOLER NAILS
AT l" O.C. AT FIRST
(4) CEILING MEMBERS
AND 2x5 PLATE
GABLED ENDWALL
IF "H" EXCEEDS 6 -0' THEN INSTALL
2x4 ON EDGE BEHIND 2x4 FLAT IN
END -WALL TRUSS. IF "N" EXCEEDS
12' -0' USE 2x6 ON EDGE. SEE ABOVE.
Architecture Engineering, Inc
SHEARWALL7
2x SOLE 1E
SEE SCHDL
FOR INFO
CUT 11 /4 x 4'
SLOT IN SI -ITHG.
E
dpNr� r
I
Igo +"1
-I
INTERFLOOR I- IOLDOUJN
2x SOLID BLK'G EACH
SIDE NEXT TO STRAP
(2) -2x OR 4x
(REF TO PLANS)
HOLDOU.N STRAP
(INSTALL STRAP W/
EQUAL LENGTH TO
BEAM I STUDS.
DBL. JOIST
OR BEAM
(12) I0d EACH
END OF STRAP
T
I-4OLDOUJN DETAIL
SIMPSON "LTP5"
SCHEDULE
FOR SPACING
Project. Structural Details
Location. Pacific Northwest
0 Copyright 1993
I
UNLESS OTHERWISE
SPECIFIED,USE (2)
SIMPSON "HTS30'
EA. END OF BEAM
BOUNDARY
NAIL
SOLID BLK'G.
r SOLID WOOD
BELOW BEAM
EN. SHTHG. TO
4 STUD W/ STRAP
EDGE NAP NG s— (2) 16d INTO TRUSS Tt8 CHORDS
2x4 AROUND BLKG.
PANEL PERIMETER
3' DIA VENT
HOLES AT 10" O.C.
PER IBC 12033
2x4 FLAT EDGE FRAMING
NAILED TO TRUSS VERTICAL
WI I6d AT 6 O.C.
1/2' PLY SHTH'G. W/
l0d AT 4 O.C. EDGES
WALL TOP PLATES
I6d AT 8" O.C. FROM BLKG.
PANEL TO WALL PLATES
4EAWALL EXTENSION
FOR TRUSS-FRAMED ROOFS
2X SOLE IE�
SEE SCHEDULE
FOR INFO
BOUNDARY 7
NAIL (BN.)
L 2 X SOLID BLK'G
BELOW ENTIRE LENGTH
OF SHEARWALL.
1— IOLDOUJN DETAIL
APA -RATED
ROOF SHEATHING
I
2XSOLID J
FRIEZE BD
SNEARWALL EXTENSION
FOR STICK FRAMED ROOFS
By RF
Date 1/2007
Job No 7000
(2) -2x OR 4x
(SEE PLAN)
HOLDOWN STRAP
(INSTALL WITH
EQUAL LENGTH
TO BEAM AND
STUDS.
BN.
DBL. JST
OR BEAM
2 X STUD WALL
SHEARWALL NAILING
SAME AS BELOW
SOLID BLK'G.
SIMPSON 'LS30'
MAY SUBSTITUTE
FOR "LTP5'
CLG. JST
APA -RATED
SHEATHNG
NAIL 8d AT 3 00. INTO
EACH SHEAR TRUSS FOR
DIAPHRAGM LOAD UP TO
200 PLF OTHERWISE USE 3 O.C.
SHEAR TRUSSES
EACH DESIGNED FOR
DIAPHRAGM SHEAR LOAD
SHOWN ON PLANS
(TRUSS TO TRANSFER SHEAR
FROM TOP TO BOTTOM CHORD)
(4) I6d NAILS
2x8 AT 16 O.C.
W/ (3) 16d EA. END
Sheet No
4p
UNLESS SPECIFIED OTHERWISE,
EITHER SHEAR TRANSFER
SYSTEM MAY BE USED
FASTEN TRUSS TO WALL
W/ 'LS50' CLIPS
SEE SCHEDULE FOR SPACING.
SHEARWALL
SHEAR TRUSS MAY BE ELIMINATED IF
SHEARWALL EXTENDS UP TO ROOF
SHEATHING. SEE DET no FOR INFO.
yN
r
22 SNEARWALL EXTENSION
4
Architecture Engineering, Inc
T
BOLT DECK LEDGER
TO RIM JOIST W/ 4b "e
AT 16" O.C. AND (2) ROWS
1641 AT 8" CO
(USE 2 -5/6" BOLTS IF
JOIST SPAN GRATER
THAN
FLOOR JOIST J
2X STUD WALL
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
BEAM
SEE SCHEDULE FOR -r
NUMBER OF NAILS
EA. SIDE
STRAP SEE
FLOOR PLAN
4 X 8 POST
I II
5" SO X 3/8 BA's PLATE
PEEN THREADS AFTER TIGHTENED
SIMP. 'MSTC40" I
EA. END OF HEADER
FASTEN TO
DBL. STUDS
I- IOLDOWN ABOVE E3EAM
THIS DETAIL ALWAYS APPLIES.
APA- RATED
SHEATHING
DECK LEDGER I- ►ANDRAIL CONN
1H16 DETAIL ALWAYS APPLIES.
EXTERIOR WALL
r'
>z •r
MULTIPULE
HOLDOWN STUDS
SEE SCHEDULE
CUT 1" X 4" SLOT IN PLY.
FLOOR SHTHG FOR STRAP
SIMPSON "H2.5
EA. SIDE 4 X 12 BEAM
II
I
II
II
NOTCH 4X8 FOR 3"
BEAM BEARING
SIMPSON "PHD2" W/
5/8" X 8" EXP BOLT
Project. Structural Details
Location. Pacific Northwest
Qc Copyright 1993
HOLDOWN W/ A3S
GRADE THREADED ROD
TREADED ROD
SIMPSON 1STC'
WRAP STRAP AROUND
HEADER IF NECESSARY
FILL CAVITY W/ SOLID
l WOOD AT HOLDCONS
I' .1 I
-DRILL HOLE I /B" GREATER IN DIA
IN CENTER OF BEAM FOR BOLT
2X LEDGER
2X BLKG.
AT STRAP
IL _1I IQ �I
ST6224 STRAP WRAP
AROUND BACK OF LEDGER
4 NAIL TO DIAG. BRACE
CONCRETE FTC.
SNEARWALL- POST CONN_
ISZI 2X6 DIA BRACE
W/ (2) 16d EA. JOIST
SIMPSON ABU"
POST BASE
OR ELEVATED
EMS" IF SLAB
OR USE BASE
CONN. SHOUN IN
DETAIL '30
2S PORCI -4 /DECK POST CONN
BEAM
2X SPACED CEDAR 1
DBL. 2X MEMBER OR
4X MEI ICER RIM JOIST.
4 X 3' X 6" X 0' -9"
STEEL ANGLE
DOUBLE 2X
JOIST
5/8 "0 THROUGH BOLTS W/ NUTS
AND I DIA X 3/16° WASHERS.
EA. SIDE. 4X6 CEDAR NEWELL
TO RIM JOIST
PERPENDICULAR WALL
(6)16c1 2 NAILS AT THE TOP
MIDDLE, 4 BOTTOM
CONNECT WALLS TOGETHER BY-FIRST
NAILING END 2x4 TO CHANNEL W/
(9)16c1 THEN INSTALL ADDITIONAL
2x4 AGAINST IT AND NAIL W/ (6) 16d
PLYWOOD SHEATHING
OVER WALL STUDS
By RF
Date 1/2007
Job No 7000
I 1
L_J
4 I/2" 4
EDGE NAIL (EN.)
TO END 2x4
()S-4EAU4LL-
EXT
THIS DETAIL ALWAYS APPLIES.
BEAM
Sheet No
UNLESS NOTED OTRERJISE,
USE 'SIMPSON' PC"
POST CAP
(USE "EPC" AT
ENDS OF BEAM)
Ltrl
PRESSURE TREATED
WOOD POST
CONCRETE SLAB
CONC.FTG.
WALL
EDGE
NAIL
CONN.
'Architecture Engineering, Inc
BOUNDARY
NAIL (SN.)
2 X SOLID
FRIEZE BD
NAIL WALL SHTHG.�-
TO EA. HOLDOWN
STUD W/ I0d m 6
FOR 2 -STORY
CONDITION, USE
'MSTC28' STRAP
DIRECTLY BELOW
GIRDER TRUSS
TIEDOWN ABOVE
r RECOMMEND
USING 'DRY'
LUMBER RIM
JOIST OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
NAIL (16) I2d
EACH END
TO STUDS ONLY
SEE DETAIL "11
TRUSS BOTTOM
CHORD OR
CEILING JOISTS
NAIL SHTHG TO
GIRDER TRUSS W/
8d AT 6 O.C.
CONNECTOR SEE PLAN
FOR SIZE. INSTALL WI
EQUAL LENGTH TO WALL
AND BLOCKING.
(2) BAYS OF
4X SOLID BLKG
W/ (2) I6d EA. END
jl
Project: Structural Details
Location Pacific Northwest
0 Copyright 1993
SIMPSON 'LGT' TIEDOWN
AT EA. GIRDER TRUSS
NOTE.
THIS DETAIL NOT REQ'D
IF TRUSS MFG. CALCS SHOW
LESS THAN 1000" NET
UPLIFT FORCE AT GIRDER
TRUSS REACTION. IF SO,
THEN USE (2) '1-125T' TIES
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
(4) I0d EA. BLK
FLOOR JOISTS
ID
2 X BLOCKING AT
6 -0' O.G WI (3) 10d
TOENAILS TO PLATE
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
NAIL WALL SHTHG.
TO EA. STUD W/
I0d AT 6 OC.
IRDER -TRUSS CONN
THIS DETAIL ALWAYS APPLIES.
FASTEN CLG. TO
BLKG. W/ DRYWALL
SCREWS AT 4 O.C.
RE- ENTRANT
CORNER
11 1
FULL -HGT
WALL
PANEL
APA -RATED SHTHG.
FILLER ON SIDE OF BM,
EDGE NAIL (EN.)
NAIL FULL -HGT STUD
TO SEAM W/ (2) ROWS
16d AT 3 O.C. STAG'RD
EDGE NAIL (EN.)
EDGE
NAIL (EN) 11
11
WHEN PANEL IS N
24 25' WIDE, 11
PROVIDE 'LTP5' y�
EACH END
AT BASE
WALL TOP
PLATES
2 X STUDS WI
16d AT 8' O.G.
STAGGERED
NAIL WALL SHTHG
TO F.H. STUDS WI
10d AT 6 O.C.
2 8"i
1- TO- UJ,4LL CONN
EXTERIOR VIEW
SUPPORT POST
TO BEAR ON FELT
30" FELT MOISTURE
BARRIER OVER
5000 PSI NON- SHRINK
GROUT (THK. mudelll)
-r
By RI'
Date 1/2007
Job No 7000
III'
NOTE:
(4) 2x6 LAM. WI I6d AT 8' O.G.
EQUALS A 6x6 SUPPORT POST
EDGE NAIL
AROUND
OPENING
HOLDOWN EA. SIDE
USE 'HDSA UNLESS
NOTED OTHERWISE
CONCRETE FOUNDATION 5/8'. EXP BOLT WI
4 1/2 MN. EMBED
30 POST- TO -FDN CONN
'ERFORATED/ WALL DESIGNATION
PANEL
WIDTH
Sheet No
TIE WALLTOP
PLATES TOGETHER
WI MSTC40 STRAP
STOP RIM JOIST
EA. SIDE OF BM
FASTEN TO F.H.
STUD W/ (2) 10d TN.
FULL -HGT STUD EA.
SIDE OF BEAM
BEAM TO SEAR ON
ON FULL AREA OF
2X STUDS LAMINATED
W/ I6d AT 12' O.G.
PT MUDSILL
STOP AT GROUT
EDGE
NAIL (EN.)
RIM JOIST
k SEE SCH'DL
I FOR 'LTPS'
SPACING
Q WALL -TO -CE IL 'G CONN 32 PERFORATED WALL NAILING
THIS DETAIL ALWAYS APPLIES.
Architecture Engineering. Inc
BEAM
T/ WALL
NJ SEE PLAN
"H" (4 -0 MAX.)
MN.
n T/ WALL I
SEE PLAN r
1 2' -0"
11 MIN. I
nn T/ FOOTING
V SEE PLAN
r
z TI FOOTING I I'
-7
(3) 0 4 CONT.
T45
FACTORY GLUED
BRIG. BLOCK
COLUMN CAP
SEE PLAN FOR TYPE
1
1
4 -0
FOUNDATION STEP
THIS DETAIL ALWAYS APPLIES.
HD ANCHOR' EMBED.
DIAMETER DEPTH
5/5" T 10"
3/4" I II"
1/8" 1 13'
2 I' -6
MIN. MIN.
ADD'L BARS IF
SPECIFIED ON PLANS
APA RATED
SHEATHING.
r
5/8"4. ABe OR
5 /8 "1. EXP BOLTS
(5' MIN. EMBEDMT)
AT HOLDOW'NS, USE
(A36) THREADED ROD
W/ SIMPS 'SET" ADHESIVE.
(SPECIAL INSPECTION
REQUIRED BY CODE)
{I
II'
1
LS i
IS UN.O.
S1- IEARUJALL AT SLAB
THIS DETAIL ALWAYS APPLIES.
HOLES MUST BE SPACED
AT LEAST 18" APART —7
Project Shearwall Schedule
Location Pacific Northwest
0 Copyright 1993
STEMWALL
FOOTING
UNDISTURBED
EARTH
MATCH FOOTING
REINFORCING J
AND TIES 2' -0'
FOOTING DEPTH (HD
EMBEDMENT DEPTH 4')
USE 14 (MIN) DEPTH
ACCEPTABLE AREA TO DRILL
MAX 2 3/4" DIAMETER HOLE.
HOLES MUST BE AT LEAST
3' -0" FROM SUPPORTS 4 MIDSPAN
AND IN THE MIDDLE THIRD
OF THE BEAM DEPTH.
GLULAM -BEAM PENETRATIONS
THIS DETAIL ALWAYS APPLIES.
2Xb FLAT W/
16d EA TRUSS
OVERFRAMING
TRUSSES OR
2X FRAMING
EXTEND ROOF
5HTIG DOLLN
TO BLKG.
PREFAB TRUSSES
OR 2X FRAMING
3' -0"
a
38
By RU
Date 1/2007
Job No 7000
THIS DETAIL ALWAYS APPLIES.
4 -BAYS OF 4X BLKG.
APA -RATED
FLOOR SHEATHING
0
Ui
co
k,
0
17
IF RAFTER IS LESS
THAN 12" FROM
SHEAF:WALL, THEN
BLOCK (2) BAYS
IF SHEARWALL
FALLS DIRECTLY
BELOW A RAFTER.
THEN USE DET. 3
2X BLKG. AT 32" OC.
w/ (2) 16d EA. END
EA. SIDE OF SH'WALL
CEILING JOIST
STUD WALL
Sheet No
16d EA TRUSS
2X SOLID SLKG.
ROOF OVERFRAMING
10d 4" OZ.
ROOF SHTG
BN.
APA -RATED
SHEATHING I!1/
8d 6 EDGES
4 12" FIELD
2X STUD WALL
O
SIMPSOtN "PHDS" HOLDOLLN EA
END LU/ 5/5" DIA (A36) THRD ROD
UTTERFLI' DfR,4 STRUT
RECOMMEND BUILDING SHEARWALL 3/16" SHORT
TO ALLOW FOR VERTICAL SHRINKAGE OF RAFTERS
ad AT 3" OC.
8d AT 6 00.
ROOF SHTHG.
RAFTERS
SHEARWALL
TO MATCH
BELOW
NAIL BLKG.
TO STUD
SHEARWALL
SHEARWALL EXTENSION