HomeMy WebLinkAbout1003 Cathleen St Technical - BuildingTECHNICAL
Permit O1 ■3l
Address 1063 C a l ern S4
Project description N fm
J
Date the permit was finaled 42 2"1 -0
Number of technical pages 3
y es i Bence
PLAN #63095C
FOR
Suntel Home Design
In return for payment of a one-time fee, ea Architecture Engineering, Inc. grants
you a limited license to use the Analysis to construct one single house a the address shown
below This lateral analysis is not to be used for any master plan approval process.
Site Location. 1003 Cathleen Street, Port Angeles, WA
Copyright: #9983
NOTICE. If the Building Department accepts the Analysis without an engineer's
original "wet- stamp" seal signed with red ink or for different site location than shown above,
then it is agreed that such Building Department accepts total liability out of or in connection
with this Analysis.
CALCULATIONS SHEAR SHEET, L -SHEET VALID ONLY WITH
ORIGINAL STAMP HERE AND DIGITAL STAMP ON PLANS
AND
CAN NOT BE USED
w 133
'22 G -�Y \eRX`
AFTER
September 2008
jaie/?/ ARCHITECTURE ENGINEERING, INC
Phone (503) 533 -5100 Fax: (503) 533 -5885 E -mail: fae- engineeringsupport@comcast.net
late/i/
Project. Yamhill -C By RF Sheet No
File #63095C- 100D -D2 WA Date 6/2007
Architecture Engineering, Inc Client. Suntel Home Design Job No 7201
IJAEAL ANAlYSIS
LIABILITY LIMITATIONS
OWNERSHIP OF DOCUMENTS
ANALYZE BUILDING FOR ONLY WIND SEISMIC FORCES
according to the
2006 INTERNATIONAL BUILDING CODE
WIND ANALYSIS FOR EXPOSURE "D" 100 MPH (3 -sec Gust)
SEISMIC ANALYSIS FOR CATEGORY D2
tF idiAC Architecture Engineering, "FAE was retained in a limited capacity for this project. Design is
based upon information provided by the Client, who is solely responsible for accuracy of same No responsibility
and liability is assumed to FAE for items beyond that shown on these sheets. No construction observations nor
soils investigations performed by FAE
INDEMNIFICATIONS BY BUILDING DEPARTMENT
Building Department agrees to defend, indemnify and hold harmless FAE from any loss, costs, damage,
expense, including attorney fees upon trial or appeal, for liability arising out of or in connection with
FAE's Analysis unless Analysis is used for specific site location shown on cover naae and contains an
original engineer's "wet- stamp" seal signed with red ink (no photocopy allowed).
All documents produced by FAE shall remain the property of FAE and shall not be used unless accompanied
by an original engineer's wet stamp issued from FAE
Architecture Engineering, Inc
ianJljiginuiunnmli�lolgni IIIIIIIIi111111
I II� VIII I� ��Illll ll:t;!III111 II II I�Ill lllip IIIIII'1 /I
r, 7
1111111111111111111111111111111
111114111111 111411M1
""'L1116dnI111,11a
iiiii1I
nnlnuumuluuln
ally :IIIIIIa;a811W16:6i 111111 f11111161: 1411FIIG• ILTIIII {j:Ilidl i141u1ug daOALlliI
111111' 11111 1111 l frI1111110111W11111 1111I1i1111nnimm�lnnllnlAl li l d 111111119111111 Ip1dIdF11111I111I1111 a1dnlllll
11111111IIIII111111111111IIIIIIIIIIIIIIIIIINIIIIIIIIIIIIil1111111111111111111111111111AIILIlll1IIIIIIIIIIIIIIIIIIIIIII
I
Project. Yaanhiil -C
File #630950- 100D -D2 -WA
Client. Suntel Horne Design
eCALE VS. NC.
QI�t 1T cLCVATIOn
V A 1
By RI'
Date 6/2007
Job No 7201
2ND FLR
LINE
IST PLR
LINE
Sheet No
Architecture Engineering, Inc
Project: Yatnhill -C
File #63095C-100D-D2-WA
Client. Suntel Home Design
SCALE= V6' P -0'
SCALE: VS' P -0
By RF
Date 6/2007
Job No 7201
Sheet No
3 /L,
7ND FLR
LINE
1ST FIR
LINE
Architecture Engineering, ,Inc
SEE 0
SEE
Project Yainhill -C
File #63095C- 100D -D2 -WA
Client. Suntel Home Design
i it i II I
By RF
Date 6/2007
Job No 7201
FASTEN EA. TRUSS TO TOP
WALL PLATE LW SIMP 'N6"
4 EA. STUD TO TOP WALL
W/ SIMP '5P2'
EXTEND WALL
SI -ITNCs DOWN
TO FLOOR
SPACE ROOF 51-ITI -ICs FASTENERS AT b O.C. AT ALL INTERMEDIATE
FRAMING MEMBERS EACH SIDE OF EACH RIDGE, HIP AND WITHIN
A 5 -0' WIDE NAILING ZONE AROUND THE ENTIRE PERIMETER OF
THE HOUSE (NAILING ZONE WIDTH STARTS AT EDGE OF ROOF)
JDIDU
T_oo2 >_q'
41 7V
Sheet No
Architecture Engineering, Inc
6x6 w/ ECC66
SEE
6x6 w/ ECC6
SEE
4
6x6 w/ ECC66
SEE
Project. Yarnhi]1-C
File #63095C-100D-D2-WA
Client. Suntel Horne Design
SIMP 'STI2 T 4 5
EACH WINDOW
OPEN
I .1
I
30' (MIN)
WALL WITH
E
ZEAL
By RF
Date 6/2007
Job No 7201
c.=1
STEINI ST 2Ar "0 5k41"
D TIC 4:: SALC CKING
BEAT
r
-7 77
e
HEADER
SEE DETAIL "3
EXTEND HEADER
OVER ENDWALLS
Sheet No
IN SHADED ARE4
USE SPECIAL NAI ING
SEE SCHEDULE
IPROIDE STRAP T 4 B
AT 14 ADER SPLICE
6
MA P_OCDQ P_A
HEADER
Architecture Engineering, Inc
D
OD
SEE ®5 SEE
Project Yamhill -C
File #63095C- 100D -D2 -WA
Client. Suntel Home Design
C,
11
L- _J Ls 10.
I I
I
II
I
4
L
SEE DETAIL 0 9
By RI-
Date 6/2007
Job No 7201
P 1
Sheet No
<P
1(p
e PaeAV
Architecture Engineering Inc
Data.
W= Total Wind Force Y x I x P x A
Y =161 I =10
FRONT REAR WALLS
SIDE WALLS
Zone
Project: Yamhill -C
File #630950- 100D -D2 -WA
Client. Suntel Home Design
WIND ANALYSIS USING 2006 IBC SIMPLIFIED WIND METHOD
Zone Horizontal Pressure
A Pa 17 8 psf
B Pb 12.2 psf
C Pc 14 2 psf
D Pd 9 8 psf
By RF
Date 6/2007
Job No 7201
Reference 2003 IBC Figure 1609 6.2 1
Projected Area
Aa 95 sq ft.
Ab 30 sq ft.
Ac 640 sq ft.
Ad 180 sq ft.
Sheet No
7 1.p
W Y I (Pa Aa Pb•Ab Pc Ac Pd Ad) W 2 08 x 10 pounds
Distribute wind force to roof and second -floor level.
FRwl Y I (0 3 Pa Aa 1 0•Pb Ab 0 3 Pc Ac 1 0 Pd Ad) FRwl 8 64 x 10 lbs
F2w1 Y I (0 7 Pa Aa 1 0 Pb•Ab 0 7 Pc Ac 1 0 Pd Ad) F2w1 1 56 x 10 lbs
Horizontal Pressure Projected Area
A Pa 17 8 psf Aa 95 sq ft.
B Pb 12.2 psf Ab 30 sq ft
C Pc 14.2 psf Ac 705 sq ft.
D Pd 9 8 psf Ad 240 sq ft.
W Y I (Pa Aa Pb•Ab Pc Ac Pd Ad) W 2.32 x 10 pounds
Distribute wind force to roof and second -floor level.
FRw2 Y I (0 3 Pa Aa 1 0 Pb Ab 0.3 Pc Ac 1 0 Pd Ad) FRw2 1 x 10 lbs
F2w2 Y I (0 7 Pa Aa 0 0 Pb.Ab 0 7 Pc Ac 0 0•Pd Ad) F2w2 1.32 x 10 lbs
eVedie/it,
Architecture Engineering, Inc
SEISMIC ANALYSIS USING 2006 IBC SIMPLIFIED ANALYSIS PROCEDURE
Data. I =1 0 Sd 1.30 R 6 5 r 0 45 (worst case)
E Earthquake Base Shear 1.2 p Qe 1 4 1.2 p (Sd W/ 1 4R)
Weights
Mass Calculations
Roof Dead Load 15 psf (Composition Roof Covering)
Floor Dead Load 10 psf
Partitions 10 psf
Exterior Walls Windows 10 psf (Average)
Aroof 1500 ft ^2
A2ndFloor 1250 ft^2
AlstFloor 1800 ft^2
h2 21 ft
Mroof 20 Aroof 10 Aroofwall
M2 20 A2ndFloor 10 A2wall
p =2—
20
r•V A2ndFloor
E 1.2 p Sd (Mroof M2) E 1 3 x 10 pounds
1 4•R
Distribute Seismic Shears
Project Yarlull -C
File #63095C 100D -D2 -WA
Client Suntel Home Design
By RF
Date 6/2007
Job No 7201
Aroofwall 700ft ^2
A2wall 1400 ft ^2
Al wall 0 ft^2
hl =10ft
Mroof 3 7 x 10 pounds
M2 3 9 x 10 pounds
p if(p 1,1,p) p 1
Mroof
FRe E FRe 6 34 x 10 pounds
Mroof M2
M2
F2e Mroof M2 E F2e 6 69 x 10 pounds
Sheet No
110
gate Av
Architecture EnTineenng, Inc
Project: Yamhill -C
File #63095C 100D -D2 -WA
Client: Suntel Home Design
By RF
Date 6/2007
Job No 7201
Sheet No
c t/i
INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH
Analyze entire brace wall line as a series of perforated shearwall panels using worst -case "maximum opening
height ratio Individual perforated shearwall panels extend between plan discontinuity Overturning for such
panel is calculated by rational analysis. Reference Section 2305 3 7.2 2006 IBC
Unadjusted in -plane shear force for brace wall line, FRe 2950#
Percent full height sheathing 8 ft. 16 ft 50%
Maximum opening height ratio 4ft 8 ft 0 50
Shear resistance adjustment factor, Co 0 8 (Ref Shear resistance adjustment factor table)
Amplified in -plane shear, V Unadiusted shear force for brace wall line
Shear resistance adjustment factor x Total length of full height walls
FRe (Co x L) 2950# (0 8 x 8 ft) 460 plf
Uplift at perforated shearwall ends calculated based on rational analysis (use only 50% of weight
of first individual full height wall segment for dead load)
2/3 average weight of full- height wall segments and portion of roof framing, Wd 110 plf
2/3 dead load reaction at end of shearwall or corner restraint, R1 400#
Uplift at end of perforated shearwalls, Pu Vf x hl Wd x (0 5 L1) Rl
460 plf x 8 ft 110 plf x (0 5 x 4ft) R1 3100#
Uplift between wall ends, t V- Wd 460 plf 110 plf 350 plf
Wall bottom plate (1 1/2" thickness) to rim joist.
Use 16d common nails (0 162 by 3 1/2 inches)
Lateral resistance 1.33 x 141# 187# per nail
Withdrawal resistance 1 33 x 40 ph x 2 5" 133# per nail.
Nails for shear transfer 460 plf 187# per nail 2 4 nails per foot
Nails for uplift transfer (460 -110 plf) l33# per nail 2 6 nails per foot
Net spacing for shear and uplift 2 4" o c
Rim joist to wall top plate
Use 16d common nail (0 162 by 3 1/2 in.) toe nailed to provide shear transfer
Lateral resistance 0 83 x 187# per nail x 1 5 nails per ft. 230 plf (150# per nail default maximur
for seismic loads) plus Simpson "LTPS" framing clip capacity 630#
Net spacing for shear using LTP5 clip and 16d toenails at 8" o c 630# (460- 150 24" o c
Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor
wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced
moments and shears Continuity of load path is provided by holdowns at ends of the perforated shear wall.
Use Type "C" shearwall w/ HTT22 holdowns, 16d at 2 1/2" o.c. sole plate nailing and LTP5 clips at 24" o.c
Sai,e4/
Architecture Engineering, Inc
RI 400"
FRe 2550"
HOLDOWN
Pu 3100"
X
4 -0'
P.S.W. Segment
ELEVATION OF PERFORATED 51-IE4FW4LL
WALL HEIGHT
8 -0'
Percent Full- Height Sheathing
10%
20%
309'
40%
50%
60%
10%
80%
Project. Yamhill -C
File #63095C- 100D -D2 -WA
Client. Suntel Home Design
SNEAK IRESIST4NCE ,4DJl.
By RF
Date 6/2007
Job No 7201
4 -0'
r3 -O)' P.S.W. Segment
Per For A ted Shea 111111 L
MAXIMUM OPENING HEIGHT RATIO AND HEIGHT
H/3 1- 2H/3 2H/6 H
2' -8 4/ 0' 5 -4 6 -8' 8' -0'
.ante Adjustment ractor
1.0 0.59 I 053 043 036
1.0 411 0.56 045 0.38
1.0 014 059 045 042
LO 011 053 053 045
1.0 050 061 I 051 I 050
L0 0.83 011 I 0.63 056
1.0 0.81 011 059 053
1.0 0.91 0.83 011 011
ST FACTOR
eg* /la fr d/
Architecture Engineering, Inc
INVESTIGATE UPPER -FLOOR SHEARWALLS.
Line "A"
Rear Walls
Line "B"
Front Walls
Project: Yamhill -C
File #63095C- 100D -D2 WA
Client Suntel Home Design
Summation of full height walls lengths
Total length of brace wall line
full height sheathing S L 100 S 73 68 percent
TL
Diaghragm stress v 0 5 FR v 113 63 plf
TL
Shearwall stress v 0 5 FR v 192 76 plf
08L
Weight Wd 110 plf
Uplift for shearwall length L1 3 ft. R1 400
(worst case)
Pu v 8 5 Wd L1 R1 Pu 977 06 pounds
Use Type 'B" Shearwall w/ MSTC40 holdowns
Summation of full height walls lengths
Total length of brace wall line
full height sheathing S L 100 S 66 67 percent
TL
Diaghragm stress v 0 5 FR v 110 71 plf
TL
Weight Wd 110 plf
Uplift for shearwall length I 1 `'t• R1 400
(worst case)
Pu v 8 5 Wd Ll Rl Pu 375 7 pounds
Use Tyre "B" Shearwall w/ no holdowus
By RF
Date 6/2007
Job No 7201
L 28 ft.
TL 38 ft.
L =26 ft.
TL• =39 ft.
Sheet No
11
Ito
Architecture Engineering, Inc
INVESTIGATE UPPER FLOOR SHEARWALLS.
Line 1 Walls
Project. Yamhill
File #63095 100D -D2 -WA
Client. Suntel Home Design
Summation of full- height walls lengths L 21 ft.
Total length of brace wall line TL 24 ft.
full height sheathing S T 100 S 87 5 percent
Diaghragm stress v 0 5 FR v 208 92 plf
TL
FR
Shearwall stress v 0 5
08L
Uplift for shearwall length L1 8 ft.
(worst case)
Pu =v8— 5 WdL1 —R1
Use Tube "B" Shearwall w/ MSTC40 holdowns
Line 2 Walls Summation of full height walls lengths
Total length of brace wall line
full height sheathing S L 100
TL
Diaghragm stress v 0 5 FR
TL
Seismic Shearwall
stress w/ wall aspect v
ratio penalty
1 75 0 5 FRe
0 78 L
Use Tune "B" Shearwall w/ HTT22 holdowns
By RF
Date 8/2005
Job No 1924
v 298 45 plf
Weight Wd 110 plf
R1 400
Pu 1 55 x 10 pounds
L =36 ft.
TL• =36 ft.
S 100 percent
v 139.28 plf
v 197 65 plf
Shearall stress v 0 5 FR
w v 178 56 plf
0 78 L
Weight Wd 110 plf
Uplift for shearwall length L1 3 ft.
(worst case) R1 400
Pu v 8 5 Wd L1 R1 Pu 863 5 pounds
Sheet No
1 2 lto
efateAv
Architecture Enineerin, Inc
Project: Yamhill
File #63095- 100D -D2 -WA
Client: Suntel Home Design
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Rear Walls
Line A
Front Walls
Lme B
Summation of full height walls lengths L 16 ft.
Total length of brace wall line TL 39 ft.
full- height sheathing S L 100 S 41 03 percent
TL
Diaphragm stress v 0 4 F2w1 v 159 77 plf
TL
Rim/blocking stress v 0.5 FRwl 0.35 F2w1 v 250 51 plf
TL
0 5 FRw2 0 35 F2w2
Shearwall stress v v 601 87 plf
L
Uplift for shearwall length L1 2 ft.
(worst case)
Pu =v9– 5 WdL1 –R1
Tyne "D" Shearwall w/ P:EID6 holdowns
By RF
Date 8/2005
Job No 1924
Weight Wd 110 plf
R1 400
Pu 4 91 x 10 pounds
Summation of full height walls lengths L 24 ft.
Total length of brace wall line TL 44 ft.
full height sheathing S 100 S 54 55 percent
TL
F2w1
Diaphragm stress v 0 3 v 106.21 plf
TL
0 5 FRwi 0 5 F2w1
Rim/blocking stress v v 275 15 plf
TL
Seismic Shearwall 1 75 (0 5 FRe 0 5 F2e)
stress w/ wall aspect v L v 475 plf
ratio penalty
0 5 FRwl 0 5 F2w1
Shearwall stress v v 504 43 plf
L
Uplift for shearwall length L1 2 ft.
(worst case)
Pu =v9– 5 WdL1 =R1
Use Tyne "D" Shearwall w/ HTT22 holdowns
Weight Wd 110 plf
R1 400
Pu 4 03 x 10 pounds
Sheet No
3 1
Architecture En (4ineerin, Inc
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Garage
Front Walls
Line C
Project: Yamhill
File #63095 100D -D2 -WA
Client: Suntel Home Design
Summation of full height walls lengths
Total length of brace wall line
full height sheathing S L 100
TL
F2w1
Diaghragm stress v 0.25
Rim/blocking stress v
Seismic Shearwall
v
stress w/ wall aspect
ratio penalty
Shearwall stress v
Use Garage Frame Detial
TL
0.25 F2w1
TL
1 75 0.25 F2e
L
0.25 F2w2
L
Uplift for shearwall length L1 1 7 ft.
(worst case)
Pu =v7— 5 WdLI —R1
By RF Sheet No
Date 8/2005 L-41
Job No 1924 Re,
L =54 ft.
TL 20 ft.
S 27 percent
v 194 72 plf
v 194 72 plf
v 541 67 plf
v 610 56 plf
Weight Wd 110 plf
R1 400
Pu 3 78 x 10 pounds
Si Wiwi.
Architecture Engineering, Inc
Project: Yamhill
File #63095- 100D -D2 -WA
Client Suntel Home Design
INVESTIGATE LOWER -FLOOR SIIEARWALLS.
Line I Walls
Summation of full height walls lengths
Total length of brace wall line
full height sheathing S L 100 S 79 55 percent
TL
F2w2
Diaghragm stress v 0 43 v 257 77 plf
TL
Rim/blocking stress v
Seismic Shearwall
v
stress w/ wall aspect
ratio penalty
0 5 FRw2 0 43 F2w2
By RF
Date 8/2005
Job No 1924
L 17 5 ft.
TL 22 ft.
Sheet No
i t�
v =48568 plf
TL
1 75 (0 5 FRe 0 43 F2e)
v 604 63 plf
L
Shearwall stress v 0 5 FRw2 0 43 F2w2 v 610 57 plf
L
Uplift for shearwall length L 1 2 f t.
(worst case)
Pu =v9— 5 WdL1 —R1
Type "D" Sh.earwalls w/ PHD6 holdowns
Weight Wd 110 Of
R1 400
Pu 4 99 x 10 pounds
krclutecture Engineering, Inc
Project Yamhill
File #63095- 100D -D2 -WA
Client Suntel Home Design
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Line 2 Walls. Summation of full- height walls lengths
Total length of brace wall line
Line 3 Walls
By RF Sheet No
Date 8/2005 i
Job No 1924
L =13 ft.
TL 40 ft.
full- height sheathing S L 100
TL S 32 5 percent
F2w2
Diaghragm stress v 0.25 v 82 43 plf
TL
0 5 FRw2 0 5 F2w2
Rim/blocking stress v v 290.2 plf
TL
0 5 FRw2 0 5 F2w2
Shearwall stress v v 892 93 plf
L
Weight Wd 110 plf
Uplift for shearwall length Ll 5 ft.
(worst case) Rl 400
Pu v 9 5 Wd Ll R1 Pu 7 36 x 10 pounds
Tyne "E" Shearwalls w/ HDO8 holdowns
Summation of full height walls lengths
Total length of brace wall line
L =20 ft.
TL 20 ft.
full- height sheathing S 100 S 100 percent
TL
F2w2
Diaghragm stress v 0 1 v 65 94 plf
TL
0 1 F2w2
Rim /blocking stress v TL v 65 94 plf
Shearwall stress v
0 1 F2w2
L
Uplift for shearwall length L1 19 ft.
(worst case)
Pu• =v9— 5WdL1 —R1
Tvne "B" Shearwalls w/ no holdowns
v 65 94 plf
Weight Wd 110 plf
Rl 400
Pu —851 53 pounds
Architecture Engineering, Inc
DRAWING NOTES
II
0
B
0
10
SIMSPON 'HU" TYPE BEAM HANGER
SIMPSON GLB' TYPE BEAM HANGER
Project. Structural Notes
Location. Pacific Northwest
Copyright 1993
OWNERSHIP OF DOCUMENTS
LEGEND
By Ill?
Date 1/2007
Job No 7000
The "diamond" shearwall designation system details were created by
Fuller Architecture Engineering, Inc (FAE) and are copyright protected
property of FAE and shall not be used unless issued from FAE
Copyright 1993
1
DESIGNATES GRID LINE
DESIGNATES DETAIL MARK
DESIGNATES SHEARWALL TYPE
DESIGNATES HOLDOWN TYPE
(SEE SHEAR SCHEDULE)
PERFORATED SHEARWALL
SEE DETAIL #30
DESIGNATES DRAWING NOTE
DESIGNATES H.D LOCATION (APPROXIMATE)
'SIMSPON 'HUxx TYPE BEAM HANGER
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'EPC' TYPE POST CAP
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'ECC' TYPE POST CAP
(3) 2 x (WALL WIDTH) BUNDLED STUDS TO SUPPORT ROOF FRAMING ABOVE.
SIMPSON 'MSTC52' FASTENED TO DBL. JOISTS OR BEAM. SEE DETAIL 6
DOUBLE FLOOR JOISTS. NAIL FLOOR SHEATHING TO EACH JOIST WITH (2) ROWS
10d COMMON NAILS AT 6' O.C.
A 'DRAG SHEAR TRUSS' DESIGN TRUSS FOR 150 PLF DIAPHRAGM SHEAR
TRANFERRED FROM TOP TO BOTTOM CHORDS THROUGH THE WEB MEBERS WITH CUMULATIVE
FORCE RESISTED AT ONE END OF THE BOTTOM CHORD
(2) STUDS UNDER BEAM CONTINUOUS DOWN TO FOUNDATION.
Sheet No
A
/G\
Architecture Engineering, Inc
5NEARWr4LL SCHEDULE
MARK WALL COVER FASTENERS
66 WALLBD
5/5 G.W.B. NAIL OR 1 4" O.0
'WII P5 SCREW
A\ 1/16" A.PA, 16GA STAPLE,
RATED 51 -IT'G 0.131 x 2
1/16" A.PA,-
RATED 5I -IT'G
AD\ 1/15" A.PA,-
RATED 51 -IT'G
1/16" A.P.A.-
RATED SHT'G
EACH SIDE
1/16 A.P.A.
RATED 5NT'G
EACH SIDE
I- 4OLDowN SCHEDULE
DESIGNATES SIMPSON PRODUCT
MARKI HOLDOWN I FASTENERS
NO
1-10L DOWN
REQUIRED
j "MSTC40'
'MSTC52'
'MSTC66
'CMSTI2" (43) I66 SINKER
\4/ 9 -0 "LONG NAILS AT EACH END
V
V
"1=44D-5"
-OR SIMPSON
'IDU -4
'l -ITT22
-0 2 SIMPSON
IHwt:l r�
'PI 1D5
'HDU -5
-OR
'HDQ -8
(15)(16)
'IDU -II or
"NHDQII"
(15)(16)
'HHDQI4
0.148 "0 x 2
0.131 "0 x 21/4
0.148 m x 2 1 /4
F RH. P -NAIL
0.148" 0 x 2 311 O.C.
FULL ROUND- STAGRD
HEAD P -NAIL,
0.148 "d' X 2'/4
FULL ROUND- 4" O.C.
HEAD P -NAIL,
0.1480 2 "o.C.
FULL ROUND STAGRD
HEAD P -NAIL,
(18) 166 SINKER
NAILS AT EACH END
(24) 166 SINKER
NAILS AT EACH END
(34) I6d SINKER
NAILS AT EACH END
,.SIMPSON
"SSTB24"
"SSTB24"
'SSTB28'
SIMPSON 'SSTB28
g PANEL
EDGES
SIMPSON 'SSTB2S'
W/ 9/54 CUT WASHE
4 HEAVY HEX NUT
1" DIA. (A35) GALV
ROD EMBED 8 INTO
12 THK x 21" WIDE
10' -0' LONG FIG,
DESIGNATES SHEAR PANEL
AND HOLDOWN TYPE.
DESIGNATES APPROXIMATE
HOLDOWN LOCATION
Project. Structural Details
Location Pacific Northwest
Copyright 1993
INTERM.
STUDS
3" O,C
4" O.C.
6 O.C.
3 OC 12" O.C.
4" OC.
12" O.0
12" O.C.
12 O.C.
SOLE (9)
PLATE
4" O.C. 16de&
S O.0 I6de 3 "oc
12 O.C. STAGRD
NOTES
I6dg 21/2 Cc
STAGRD
I6dg 3 oc
STAGRD
I6dg 21/2 oc
STAGRD
16de 11/2"oc
STAGRD
166 TOENAILS
AT 8 O.C,
(3)
"LTPS "e 45" oc
(3)
'LTPS "e 24 oc
'LTPS'w 5
By RF
Date 1/2007
Job No 7000
BLOCKING/ (9) 5/ "4' x 1"
RIM JOIST EMB. ABs
48" O.0
48 O.C.
16" O.0
(3)
"LTPS "e 16" oc 10" O.0
(3)
"LTPS'e 10' oc 18" O.C.
(3)
CC 12" O.0
Sheet No
2.
ALL PANEL EDGES
MUST BE BLOCKED
REMARKS
11/2 LONG x 1/I6 WIDE
STAPLES W/ CROWNS
PARALLEL W/ FRAM'G.
DBL. STUDS/BLKG. AT (5)
ADJOINING PANEL EDGES
W/ 166 AT 4" 0.0
DBL. STUDS/BLKG. AT (5)
ADJOINING PANEL EDGES
W/ 166 AT 4 O,C
DBL. STUDS/BLKG. (8)(II)
e ADJOIN'G PANEL EDGES
W/ 16d AT 4" 4 3X MUDSILL
3X. MUDSILL AND (8) (1I)
3X. STUDS /BLKG. AT
ADJOINING PANEL EDGES
PER NEW CODE, ALL ANCHOR BOLTS MUST
HAVE 2 SQUARE X 3/I6 HDG PLATE WASHERS
1. ALL FASTENERS USED AT THE COAST AND IN CONTACT WITH PRESSURE
TREATED MATERIAL MUST BE HOT DIPPED GALVANIZED (HDG)
2, 'F RH. P -NAIL DESIGNATES A FULL ROUND HEAD PNEUMATIC- DRIVEN
NAIL (10d GALV BOX NAILS MAY SUBSTITUTE FOR 0.1480 P- NAILS)
3 SIMPSON 'RBC BOUNDARY CLIPS TO SUBSTITUTE FOR 'LTPS AT ROOF
4 SHEATHING ON SHEARWALLS MUST EXTEND DOWN TO SOLE 4 MUDSILL
PLATES AND SHALL NOT BE INTERRUPTED BY ANY WALL BUTTING INTO
THE SHEARWALL.
5 PROVIDE DOUBLE STUDS/BLKG. W/ 166 AT 4" O.C. AT ADJOINING PANEL
EDGES TO AVOID SPLITTING, NAIL EACH PANEL EDGE TO ONLY ONE 2X.
6 'SIMPSON" PRODUCTS SHALL BE INSTALLED AS PER MPG. SPECS
1. HOLDOWNS OCCUR AT ENDS OF SHEAR -WALLS AND SHALL FASTEN
TO A MINIMUM OF (2) STUDS (MIN.) LAMINATED TOGETHER W/ 166 AT 6 "o.
S. USE LONGER FDN. BOLTS WITH 3X MUDSILL AND SET BOLTS HIGHER
DO NOT INSTALL FDN. VENT WITHIN 12 CLR. OF A HOLDOWN ANCHOR BOLT
9. FASTENERS SPACING APPLIES ONLY AT FULL HEIGHT WALL SEGEMENTS
OTHERWISE USE MINIMUM CONSTRUCTION STANDARDS
10 ANCHORS SHALL HAVE MIN 13/4 EDGE DISTANCE 4 5 END DISTANCE.
II. WALLS WITH PLYWOOD ON EACH SIDE SHALL OFFSET PLYWOOD EDGE
JOINTS ON ONE SIDE OF TI-4E SHEARWALL FROM THOSE ON THE OTHER
EXTEND PLYWOOD THROUGH CORNER AS :'HOWN IN DETAIL 14 TO
ACHIEVE MINIMUM SHEARWALL WIDTH SHOWr ON PLANS
12 SHEARWALLS WITH OVERDRIVEN NAILS PENETRATING SURFACE BY MORE
TI-IAN 1/8 WILL BE REQUIRED TO BE RENA;ILED USE A RUBBER
GROMMET IN HEAD OF NAIL -GUN AND ADJUST AIR PRESSURE SO NAIL
HEADS ARE FLUSH WITH OR SLIGHTLY RECESSED INTO SHEATHING.
13. ALL STUD WALLS MUST HAVE DOUBLE TOP PLATES W/ 166 AT 8 OG,
AND STUDS I6 II o.c_ PLATES SHALL LAP A MINIMUM 4 -O AT SPLICES
WITH AT LEAST EIGHT 166 NAILS EACH SIDE OF SPLICE
14 HOLDOWN TYPES W/ GREATER NUMERICAL DESIGNATION MAY
SUBSTITUTE FOR HOLDOWNS WITH LESSER. SEE CHART TO THE LEFT
15 USE 3000 PSI CONCRETE IN STEMWALL. PROVIDE (2) *4 CONT T 4 B
IN STEMWALLS WITH THESE HOLDOWNS EXTEND I0' -0 PAST HOLDOWNS
16 FASTEN TO (4) 2x6 FULL -I-IGT STUDS FASTEN EACH STUD TOGETHER WI
(2) ROWS 166 AT 6 O.G. STAGGERED EDGE NAIL WALL PLY TO EA. STUD
IN SHADED AREAS FASTEN SHTHG. AT 4 0G. AT BOUNDARIES OF
SHADED AREA AND PANEL EDGES. BLOCK PANEL EDGES W/ 2
NOMINAL FLAT BLOCKING. USE 86 COMMON NAILS FOR ROOF.AND
106 AT FLOORS /CLGS. USE 5/8 OSB OR PLY SHTI.4G, AT CEILINGS
REFERENCES TO SEE NOTES ABOVE
Architecture Engineering, Inc
APA -RATED
ROOF 51-IEATHING
BOUNDARY
NAIL (ESN.)
2 X SOLID
FRIEZE BD
2 X STUD WALL
SEE NOTE
BELOW
ROOF FERIMETER
7H15 DETAIL ALWAYS APPLIES.
SIMPSON 'LTPS')
SEE SCHEDULE
FOR SPACING
SHEARIJALL
EXTEND WALL
SHTHG DOWN
TO TOP WALL
PLATE 4 EN.
EDGE NAIL ZEN)
PLY. SPLICE PT.
EDGE NAILING
SIMPSON 'LTPS "J
RECOMMEND
USING 'DRY'
LUMBER RIM
JJIST OR 'LSL
RIM BOARD TO
MINIMIZE SUCKLING
OF SHEATHING
r
I0d 4 O.C.
PLYWOOD
DECK SHEATHING
I I-+ -JOIST
L-2 X SLOCK'G
EA. SIDE 48'
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS'
APA -RATED
SHEATHING
JOIST /SI- EAiWALL
SOLE PLATE
NAILING SEE
SCHDE FOR INFO
(4) IDd EA. BLK.
FLOOR JOISTS
2 X BLOCKING AT
6 -0' O.0 W/ (3) 10d
TOENAILS TO PLATE
2 X STUD WALL
APA -RATED
SHEATHING
0 PARALLEL JOISTS
THIS DETAIL ALWAYS APPLIES.
Project: Structural Details
Location. Pacific Northwest
Q Copyright 1993
SIMPSON 'H1' TIE AT
EACH RAFTER ALONG
ENTIRE PERIMETER
NOTE: 'HI0 -2' MAY
SUBSTITUTE FOR 'HI'
NOTE: SIMP 9-42.5' MAY
SUBSTITUTE FOR 'Hi' AS
LONG AS 'RBC' CLIPS AT
24 o.c. ARE USED TO
CONNECT THE FRIEZE SD
TO TOP WALL PLATE.
APA -RATED
ROOF SHEATHING
Sd 4 O.C.
END OF
2X WALL
By RF
Date 1/2007
Job No 7000
2 X 6 FLAT BLK'G
W/ I6d 0 4 O.C.
INTO WALL
SHEARWALL
PLYWOOD
5HEATHING
10d 4 O.G.
16d m 8'o.c_
SOLID BLK'G.
SIMPSON 'LTPS'
SEE SCHEDULE
FOR SPACING
10d 6 O.G. AT FLOOR
AT DSCR, PROVIDE 2x4
x 5' -0' LONG NAILED TO
BOTTOM CHORD WI I6d AT
4 O.G. STAGGERRED
PREDRILL HOLES FOR
CONNECTOR SCREWS
DRAG STf2UT
Sheet No
S
RAFTER OR
TRUSS —EN.
FLOOR
SI- ITH'G.-
2 X SOLID BLKG.
WI SIMPSON 'LS50'
EN.
—1/2' SHTHG WI 10d AT 4 O.G.
EDGES, BLOCK EDGES.
SEE SIH'WALL SCHEDULE
FOR ADDITIONAL INFO
2 X STUD WALL
STRUCTURAL CE I L ING
SOLID BLK'G.
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS'
JOIST
SFIEARWALL
APA -RATED
SHEATHING
JO IST/Si-1E AIRWAL
END OF 2x4
t DRAG STRUT T I I i
SOLID BLKG
EA. SIDE 5' -0'
AWAY FROM END
OF DRAG STRUT
BM.
CONNECTOR SEE PLAN
FOR SIZE. INSTALL WI
EQUAL LENGTH TO DRAG
STRUT AND WALL.
Architecture Engineering. Inc O Copynght 1993 Job No 7000
ga tier
SOLE PLATE
NAILING SEE
SCHEDULE
FLOOR 1
FRAMING I
4
CONT HORIZ.•� .1
AT TOP 4 BOTTOM 11
I I
11
CONC. STEM WALL
NOizMAL JOISTS
THIS DETAIL ALWAYS APPLIES.
(12) I6d-'
3-
T/F ?N WALL
B E YOND
AT PRON DE I
HK—
WALL EINF
T/FTCx
EDGE NAIL SIDE WALL
SI-ITI-1'G TO 4x6 STUD
LJ..
'1
I, 1 MIN. PLY WIDTH 1 I,
EA. SIDE I' 10'
7,...,,
I
1
1
I
I
/1 I
I
I 1
1 i
17 11.
11 II 11
•II
11 II II •II
II 1I
11
U
4' -0"
'SPA RATED
SHEATHING FASTENED
TO MUDSILL PLATE
'd DOWELS 48' O.C.
(MINIMUM)
SIMPSON IISTC2S"
EA. SIDE (4- TOTAL)
0 4 HAIRPIN EAR •1-4
8" CONCRETE WALL WI
(2)'4 DOWELS EA. END
UNDER SHEARWALL
(2) •4 X I -0
•1
12" SO. CONT FTC.
W/ (2) 'dT
24" x 48 "X12" FTG.
4' -0" r W/ (3)04 CENTERED
BELOW RAISED STEMWALL
GARAGE -FRAME DETAIL
Project Structural Details By RF
Location Pacific Northwest Date 1/2007
EDGE NAIL (EN)
SIMPSON 'LS50" ANCHOR
(NOT REQ'D IF SHTH'G
EXTENDS CONT TO MUDSILL
W /OUT ANY JOINTS)
EDGE NAIL (EN)
A6 x 1" EMS. AB's
W/2 X2 X3/16
PLATE WASHERS OR
SIMP 'BP 5 -2'
NOTE
EXTEND GARAGE
DOOR HEADER
OVER ENDUJALL.
HEADER WIDTH TO
MATCH WALL WIDTH
NAIL SHEATHING TO
HEADER W/ O.I48 "0 x
2 F RI-I. P-NAILS
3 O.G. BOTH WAYS
4x6 STUD EA. END
W/ ADD'L 2x NAILER
COMER WI 16d 6
CA A(E
APA -RATED SHTH'G
FROM A SINGLE SHEET
DOTH SIDES WI 0.148"0
F RI-1. P -NAILS INTO
4x6 W/ (2) ROWS AT 2" oc.
EXTEND PL•IUD THRU
CORNER SEE DET 14
6X SOLID BLOCKING
AT SHEATHING SPLICE
SIMPSON 'PI-IDS
4x6 PLATES W/ (2) 5/8 "0X12'
SIMP 'BP%11,5' WASHERS
(2) ROWS OF NAILS AT 1 1/2'
STAGGERED TO MUDSILL
SIMPSON 'LTP4" EA. END'
J -BOLTS AT 5" o.c. WI
2 -3 n
(4)I0d•3 O.C—
PLYWOOD
DECK SHEATHING
rr
IF FLOOR JOIST
SYSTEM, PROVIDE f1
2 X BLOCKING .11
12 O.G. W/ (3) 1 t
1Od TOENAILS 7 iI
TO PLATE
CONC. STEM WALL
0 fi A ALLE.L JOISTS
PONYWALLS 4 -0" AND TALLER MUST SE
APPROVE BY ENGINEER OTHERWISE OK
THIS DETAIL ALWAYS APPLIES.
11
I
:1
fl
•fl
I: I•
•1 I
:P0I4 n
•r'PE '51-;EA
•$REDUIREIIENT6 f I
•r
0 4 CONT HORIZ T 4 S
al, x 1" EMS. AB's
W/ 2 2 X 3/16
i! PLATE WASHERS OR
SIMP 'BP 5/5 -2'
II 0 4 DOUJELS 45' O.C.
VE
ALL
IIN.)
"PA RATED
SHEATI -ING.
Sheet No
A --4
SOLE PLATE
NAILING
EDGE NAIL (EN)
SIMPSON "L550" AT
SAME SPACING AS 'LTPS
EDGE NAIL (EN)
I I.
uIn
II 1111 I I 'li N
(I 1111
II iu
FI
1i
11 CONCRETE FOUNDATION „II
MIN. (2) 2X6 STUDS AT
HOLDOUNS EDGE
NAIL PLY TO STUDS
PROVIDE SOLID WOOD
I•IOLDOI.N STUDS
SIMPSON
HOLDOILN
A36 •1-READED
ROD WITH SAME
DI TER AS
ANC O R BOLT
:11'10 •SIMPSON
II 410
i
•4 CONTT 4$ II
ll
11
SIMPSON 'CNW' COUPLER
'STAG BOLT
'4 DOWELS 48" 0G.--
1- IOLDOWN FON-T.-WALL
Architecture Engineering. Inc.
WALL p SOLE PLATE
SHEATHING NAILING
r SOLID BLK'G.
f
EDGE NAIL
SHEATHING II��
ry —RIM JOIST MAY SUBSTITUTE 'TITU
IIIIA11ll��flf MAY SUBSTITUTE
JOIST FOR "1-11=5'
EDGE NAIL
PLY TO
HOLDOWN
STUDS
IF BEAM IS
UPTURNED USE
2x6 LEDGER
WI I6d AT6'cc•
STAGG'RD.
SIMPSON 'LTPS' 1
SEE SCHEDULE
FOR SPACING
2 X STUD WALL
APA -RATED
WALL SHEATHING
BOUNDARY
NAIL
CANTILEVER JST
LAM. STUDS
TOGETHER W/
I6d AT 6 O.C.
1 1 III Y436J TH ROD ��.II
.11• II II WI. SIMPSON. 'SET' ADHESIVE. XII:
'L (SPECIAL INSPECTION
11 REQUIRED.BY CODE)
Il
u
:1 1.
11 CONCRETE FOUNDATION•
Project: Structural Details
Location Pacific Northwest
0 Copyright 1993
lul
ANCHOR EMBED
DIAMETER DEPTH
5/8' 10'
3/4" I II"
1/8" I 13"
HOLDOWN
GRADE A36'
THREADED ROD
SEE SIMPSON
CATOLOG FOR
DIAMETER
1
I
13 MISSING 1- 4OL1DOUJN 4NC+ -IOR
BOUND NAIL ROOF PLYWD TO
2 X 10 LEDGER W/ BEVELED
RUN PLY. 1 TOP TO MATCH ROOF SLOPE.
CONT TO NAIL LEDGER W EA
(2) -I6d E
BOTTOM E WALL STUD EA. 2 X 6 BLK'G.
(USE 2x 8 BLKG. IF TRUSS ROOF)
FOR THIS SECTION OF ROOF
BLOCK G g I BOCK PANEL E DGES W 2 X
AND BOUNDARIES, 12' O.C. IN FIELD
SEE PET .2 SEE PLAN IF PLYWOOD
IF BM EXTENDS CEILING IS REQUIRED
BELOW CEILING FASTEN RAFTER TO WALL
PLATE W/ SIMPSON 'HI'
SEE DET I FOR ADD'L INFO
5HEARWALL PLYWD MUST EXTEND
DOWN TO BOTTOM WALL PLATE
(TYP.)
BN.
ROOF LEDGER DETAIL
APA -RATED
WALL
SHEATHING
(2) -2x OR
4x (REF.TO
PLANS)
HOLDOWN
STRAP WRAP
AROUND DBL.
JOISTS
SIMPSON
'HTS30'
EA. SIDE OF
DEL. JOISTS
(PROVIDE WEB
STIFFENDER IF
I -JOIST USED)
By RF
Date 1/2007
Job No 7000
CONT RIM 4
2X BLKG. OR
DEL. RIM JST
®1-1OLDOUJN TO RIM JST
NAILS BASED
ON SHEARWALL
REQMTS. BELOW
(12) 10d
EA. END
OF STRAP
IF THIS IS A SH'WALL
W/ A HOLDOWN,
THEN EXTEND SHTH'G
THRIJ t EDGE NAIL
NOTE.
THIS DETAIL IS REQ'D
ONLY WHEN TWO _L
SHEARWALLS SHARE
ONE HOLDOWN.
FRAMING AT CORNER
SHTHG.--)
Sd AT 6 o...
AT ALL FRAMING
MEMBERS WITHIN,
5 -0' OF EDGE
GABLE END TRUSS
a
EITHER NO
JOINT IN PLYWOOD
OR
FASTEN SH'WALL TO
ENDWALL TRUSS WI
BLOCKING/RIM
FASTENERS SHOWN
IN 51-'WALL SCND'L.
SH'WALL SEE
SH'WALL SCHEDULE
FOR NAIL'G REQMTS.
2x4 FLAT AT 24" O.C.
IN END -WALL TRUSS
2X VERTICAL BRACE
(2) I0d AT 8' O.C.
2x4 BLKG. AT 6 -0' O.G.
W/ Sd AT 3 O.G.
TRUSS BOTTOM CHORD OR CEILING JOIST
(2) I6d EA. TRUSS
SOLE PLATE
NAILING
BOUNDARY
NAIL
SOLID BLK'G.
2x4 x 8' -0" LATERAL
BRACE AT 6 -0' c. c.
(6) I6d NAIL:
Sheet No
5
SIMPSON 'LS50'
MAY SUBSTITUTE
JOIST FOR 'LTP5'
DBL. JOIST AT
EACH END OF WALL
OVER DBL. STUDS
FASTEN TO RIM JOIST
W/ SIMPSON 'LSO'
4x6 OR
(2) 2X STUDS
I6d AT 6 O.G.
HOLDOWN
I6d AT 6 O.C.
INTO EA. STUD
EDGE NAIL
HOLDOWN
DBL. 2xSOLID BLOCK
W/ (2) SIMP 'LS50'
TO WALL PLATE
2x6 PLATE W/ I6d
AT 12' o.c. TO WALL
GYPSUM BOARD
DIAPHRAGM WITH
5d COOLER NAILS
AT 1' O.C. AT FIRST
(4) CEILING MEMBERS
AND 2x6 PLATE
GABLED ENDUJALL
IF "H' EXCEEDS 6 -0' THEN INSTALL
2x4 ON EDGE BEHIND 2x4 FLAT IN
END -WALL TRUSS. IF 'H" EXCEEDS
12' -0' USE 2x6 ON EDGE. SEE ABOVE.
Architecture Engineering, Inc
SHEARWALL7
2x SOLE•IE-
SEE SCHDL
FOR INFO
CUT 1/4 x 4'
SLOT N SHTHG.
2x SOLID BLK'G EACH
SIDE NEXT TO STRAP
-40-ev
-„Ao
tiP
Pre 91
R
E�'� '''19 I
INTERFLOOR NOLDOUJN
I i,
groz
(2) -2x OR 4x
(REF TO PLANS)
1- OLDOWN STRAP
(INSTALL STRAP W/
EQUAL LENGTH TO
1 BEAM 4 STUDS.
DBL. JOIST
OR BEAM
(12) 10d EACH
END OF STRAP
EDGE NAILING
21� SHE ARUJALL
FOR TRUSS- FRAMED ROOFS
J
1- IOLDOWN DETAIL
Project. Structural Details
Location. Pacific Northwest
cU Copyright 1993
I
UNLESS OTHERWISE
SPECIFIED,USE (2)
SIMPSON "4TS30'
EA. END OF BEAM
BOUNDARY
NAIL
SOLID BLKG.
SIMPSON 'LTP5'
SEE SCHEDULE
'i FOR SPACING
sef,_ SOLID WOOD
BELOW BEAM
EN. SHTHG. TO
STUD W/ STRAP
(2) 16d INTO TRUSS T4B CHORDS
2x4 AROUND BLKG.
PAN. EL PERIMETER
3' DIA VENT
HOLES AT I0" O.C.
PER IBC 12032
EXTENSION
2x4 FLAT EDGE FRAMING
NAILED TO TRUSS VERTICAL
W/ I6d AT 6 O.C.
1/2' PLY SHTH'G, W/
10d AT 4' O.C. EDGES
WALL TOP PLATES
I6d AT S' O.C. FROM BLKG.
PANEL TO WALL PLATES
2X SOLE IE
SEE SCHEDULE
FOR INFO
L 2 X SOLID BLK'G
BELOW ENTIRE LENGTH
OF SHEARWALL.
®kOLQWN DETAIL
APA -RATED
ROOF SHEATHING
BOUNDARY
NAIL (BN)
2 X SOLID
FRIEZE BD
\H
By RF
Date 1/2007
Job No 7000
(2) -2x OR 4x
(SEE PLAN)
HOLDOWN STRAP
(INSTALL WITH
EQUAL LENGTH
TO BEAM AND
STUDS.
B.N.
DBL. JST
OR BEAM
2 X STUD WALL
SHEARWALL NAILING
SAME AS BELOW
SOLID BLK'G.
SIMPSON "LS50'
MAY SUBSTITUTE
FOR "LIPS'
CLG. JST.
APA -RATED
SHEATHING
NAIL Sd AT 3 00. INTO
EACH SHEAR TRUSS FOR
DIAPHRAGM LOAD UP TO
200 PLF OTHERWISE USE 3 O.C.
SWEAR TRUSSES
EACH DESIGNED FOR
DIAPHRAGM SWEAR LOAD
SHOWN ON PLANS
(TRUSS TO TRANSFER SHEAR
FROM TOP TO BOTTOM CHORD)
(4) I6d NAILS
2x5 AT 16' O.C.
W/ (3) I6d EA. END
SWEARWALL
SHEAR TRUSS MAY BE ELIMINATED IF
SHEARWALL EXTENDS UP TO ROOF
SHEATHING. SEE DET *20 FOR INFO.
S heet No
to
SHEARUJALL EXTENSION
FOR STICK FRAMED ROOFS
UNLESS OTHERWISE,
EITHER SWEAR TRANSFER
SYSTEM MAY BE USED
FASTEN TRUSS TO WALL
W/ 'L550' CLIPS
SEE SCHEDULE FOR SPACING.
@SI-1EARUJAL L EXTENSION
Architecture Engineering, Inc
1- IOLDOUJN ABOVE BEAM
THIS DETAIL ALWAYS APPLIES.
BOLT DECK LEDGER
TO RIM JOIST W/ 4 b "e
AT IS O.C. AND (2) ROWS
I6d AT S" O.C.
(USE 2 -5 /S' BOLTS IF
JOIST SPAN GREATER
THAN "10-0'.)
FLOOR JOIST
2X STUD WALL
APA -RATED J
SHEATHING
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
16d 0 6" O.C:
BEAM
STRAP SEE
FLOOR PLAN
4 X 8 POST
SIMP. "MSTC40"
EA. END OF HEADER
FASTEN TO
DBL. STUDS
S' SQ X 3/5" BR3 PLATE
PEEN THREADS AFTER TIGHTENED
I I
I I
II
I
x
>C
Project. Structural Details
Location Pacific Northwest
Oc Copyright 1993
SIMPSON "H2.5"
EA. SIDE
HOLDOU.N WI 435
GRADE THREADED ROD
TREADED ROD
SIMPSON '11STC'
WRAP STRAP AROUND
HEADER IF NECESSARY
FILL CAVITY W/ SOLID
WOOD AT HOLDOU.NS
I I I
-DRILL HOLE I /S" GREATER IN DLA.
IN CENTER OF BEAM FOR BOLT
it
EXTERIOR WALL
2X LEDGER
2X BLKG.
AT STRAP
IQ
I5 "I 2X6 DIA. BRACE
W/ (2) 16d EA. JOIST
ST6224 STRAP WRAP
AROUND BACK CF LEDGER
4 NAIL TO DIAG. BRACE
DECK LEDCIER HANDRAIL
THIS DETAIL ALWAYS APPLIES.
MULTIPULE
HOLDOWN STUDS
SEE SCHEDULE
CUT 1" X 4" SLOT IN PLY.
FLOOR SHTHG FOR STRAP
NOTCH 4X8 FOR 3"
BEAM BEARING
SIMPSON "PHD2" WI
5/8" X 8" EXP BOLT
CONCRETE FTG.
4 X 12 BEAM
AAA\AAAAA A\
51- IEARUJALL POST CONN.
SIMPSON ABU"
POST BASE
OR ELEVATED
"EPB' IF SLAB
OR USE BASE
CONN. SHOUN IN
DETAIL 30
DBL. 2X MEMBER OR
4X MEMBER RIM JOIST
la X 3' X 6" X 0' -S"
STEEL ANGLE
II II
DOUBLE 2X
JOIST
BEAM
2X SPACED CEDAR
PERPENDICULAR WALL
PLYWOOD SHEATHING
OVER WALL STUDS
By RI
Date 1/2007
Job No 7000
4 1,2 4
S/S 4 THROUGH BOLTS W/ NUTS
AND I DIA. X 3/16' WASHERS.
EA. SIDE. 4X6 CEDAR NEWELL
CCNN. TO RIM JOIST
(6) I6d 2 NAILS AT THE TOP
MIDDLE, 4 BOTTOM
CONNECT WALLS TOGETHER BY FIRS
NAILING END 2x4 TO CHANNEL W/
(9116d THEN INSTALL ADDITIONAL
2x4 AGANST.IT AND NAIL W/ (5) 16d
EDGE NAIL (EN.)
TO END 2x4
(5) 16d
THIS DETAIL ALWAYS APPLIES.
L-P-1
BEAM
UNLESS NOTED OTHERWISE,
USE SIMPSON' PC'
POST CAP
(USE "EPC' AT
ENDS OF BEAM)
PRESSURE TREATED
WOOD POST
/CONCRETE SLAB
CONC. FTG.
h
25 PORCI /DECK FOST CONN\I.
Sheet No
EDGE
NAIL
2
51EARUJALL- EXT IUALL CONN.
Natie/e/
Architecture Engineering, Inc
BOUNDARY
NAIL (BN.)
2 X SOLID J
FRIEZE BD
NAIL WALL SHTHG.---
TO EA. INOLDOWN
STUD W/ I0d 6
FOR 2 -STORY
CONDITION, USE
'MSTC2S' STRAP
DIRECTLY BELOW
GIRDER -TRUSS
TIEDOWN ABOVE
RECOMMEND
USING 'DRY'
LUMBER RIM
JOIST OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
NAIL (16)12d
EACH END
TO STUDS ONLY
SEE DETAIL *11
TRUSS BOTTOM
CHORD OR
CEILING JO ISTS
NAIL SHTHG TO
GIRDER TRUSS WI
Sd AT 6 O.C.
CONNECTOR SEE PLAN
FOR SIZE. INSTALL WI
EQUAL LENGTH TO WALL
AND BLOCKING.
THIS DETAIL ALWAYS APPLIES.
(2) aAYS c-
4: SC LID ELKG
W/ (2) 16d EA. END
/r
Project. Structural Details
Location Pacific Northwest
0 Copyright 1993
SIMPSON 'LGT' TIEDOWN
AT EA. GIRDER TRUSS
NOTE.
THIS DETAIL NOT REQ'D
IF TRUSS MFG. CALCS SHOW
LESS THAN I000« NET
UPLIFT FORCE AT GIRDER
TRUSS REACTION. IF SO
THEN USE (2) 'H2ST' TIES
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
(4) I0d EA. BLK
FLOOR JOISTS
2 X BLOCKING AT
6 -0' O.0 WI (3) I0d
TOENAILS TO PLATE
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
NAIL WALL SHTHG.
TO EA. STUD WI
I0d AT 6 OC.
C IIRDER -TRUSS CONN
RE- ENTRANT
CORNER
FASTEN CLG. TO
BLKG. W/ DRYWALL
SCREWS AT 4 O.G.
31 UJALL- TO- GEIL'Cs CONN
FULL -HGT
WALL
PANEL
APA -RATED SHTHG.
FILLER ON SIDE OF BM.
EDGE NAIL (EN.)
NAIL FULL -HGT STUD
TO SEAM WI (2) ROWS
I6d AT 3 O.C. STAG'RD
EDGE NAIL (EN.)
WALL TOP
PLATES
2 X STUDS W/
I6d AT 5' O.G.
STAGGERED
NAIL WALL SHTHG
TO F.H. STUDS WI
10d AT 6 O.G.
SUPPORT POST
TO BEAR ON FELT
EDGE
NAIL (EN.) 11
WHEN PANEL IS 11
24 29' WIDE, 1.1
l y
PROVIDE LIPS' e_
EACH END
AT SASE
151'1-T0-WALL CONN
EXTERIOR VIEW
30" FELT MOISTURE
BARRIER OVER
5000 PSI NON- SHRINK
GROUT (THK mudslil)
CONCRETE FOUNDATION
I
By RF
Date 1/2007
Job No 7000
I
NOTE:
(4) 2x6 LAM. WI 16d AT 5' O.C.
EQUALS A 6x6 SUPPORT POST
POST- TO-FDN CONN
EDGE NAIL
AROUND
OPENING
PERFORATED/ \WALL DESICsNATION
I.
Sheet No
Shn
/N7-6
TIE WALLTOP
PLATES TOGETHER
W/ MSTC40 STRAP
STOP RIM JOIST
EA. SIDE OF BM
FASTEN TO F.H.
STUD W/ (2) I0d TN.
FULL -HGT STUD EA.
SIDE OF BEAM
BEAM TO SEAR ON
ON FULL AREA OF
2X STUDS LAMINATED
W/ I6d AT 12' O.C.
1- IOLDOU.N EA. SIDE
USE HDSA UNLESS
NOTED OTHERWISE
P T MUDSILL
STOP AT GROUT
S/540 EXP BOLT WI
4 1/2 MIN. EMBED
PANEL
WIDTH
EDGE
NAIL (EN.)
RIM JOIST
SEE SCH'DL
FOR 'LIPS'
SPACING
32 PERFORATED WALL NAILING
J THIS DETAIL ALWAYS APPLIES.
BEAM
Architecture Engineering, Inc
[l T/ WALL
IL/ SEE PLAN
1
"H" (4 -2 MAX)
T/ WALL
SEE PLAN I___
1
T/ FOOTING
SEE PLAN I
1 I
I W
TI FOOTING I I I
.i IL
sakA,
(3) 0 4 CONT
T4B
FOUNDATION STEP
THIS DETAIL ALWAYS APPLIES.
HD ANCHOR! EMBED
DIAMETER I DEPTH
5/8' I 10"
3/4" I II"
1/8" I 13"
ADD'L BARS IF —i
SPECIFIED ON PLANS
35, S+— IEARUJALL AT SLAE3
:FACTORY GLUED
BRG. BLOCK
COLUMN CAP
SEE PLAN FOR TYPE
I 2' -0"
MN. j
THIS DETAIL ALWAYS APPLIES.
1.1" 2 I' -6
MN. MN.
N./
4 -0'
MIN.
18' UN.O.
Project Shearwall Schedule
Location Pacific Northwest
Copyright 1993
APA RATED
SHEATHING.
5/5" 0 AB• OR
5/8"4' EXP BOLTS
(5' MN. EMBEDMT)
AT 1- IOLDOWNS, USE
(A36) TI- TREADED ROD
W/ SIMPSON 'SET" ADHESIVE.
(SPECIAL INSPECTION
RECUIRED BY CODE)
i
I I•
HOLES MUST 6E SPACED
AT LEAST 18' APART
STEMWALL
FOOTING
UNDISTURBED
EARTH
MATCH FOOTING 2.
REINFORCING
AND TIES 1' -0'
FOOTING DEPTH (HD
EMBEDMENT DEPTH 4
USE 14' (MIN) DEPTH
ACCEPTABLE AREA TO DRILL
MAX 2 3/4' DIAMETER HOLE.
HOLES MUST BE AT LEAST
3 -0" FROM SUPPORTS 4 MIDSPAN
3' -o" AND IN THE MIDDLE THIRD
"O F THE BEAM DEPTH.
GsLULAM —BEAM PENETRATIONS
THIS DETAIL ALWAYS APPLIES.
2X6 FLAT WI
I6d EA TRUSS
ad 6 O.G.
OVE WRA ZING
TRUSSES OR
2X FRAMING
EXTEND ROOF
SHTHG DOLLN
TO BLKG.
PREFAB TRUSSES
OR 2X FRAMING
THIS DETAIL ALWAYS APPLIES.
4 -BAYS OF 4X BLKG.
APA -RATED
FLOOR SHEATHING
0
0
IF RAFTER IS LESS
THAN 12" FROM
51-1EARWALL, THEN
BLOCK (2) BAYS
m
4
0
By RF
Date 1/2007
Job No 7000
IF SHEARWALL I
FALLS DIRECTLY
I BELOW A RAFTER
I THEN USE PET. 3
3 -0" TX BLKCs. AT 32 OC.
w/ (2) I6d EA. END
EA. SIDE OF SI- !'WALL
CEILING JOIST
STUD WALL
Sheet No
ROOF OVERFRAMING
2X STUD WALL
10d 4 OC.
7 °F
SIMPSON "PHDS" I•IOLDOW'N EA.
END WI 5/8" DIA (A36) THRD ROD
BUTTERFL""r DRAG STRUT
RECOMMEND BUILDING BI•IEARWALL 3/16 SHORT
TO ALLOW FOR VERTICAL SHRINKAGE OF RAFTER£
ad AT 3" OC.
8d AT 6 00.
ROOF SMTHG.
ROOF SHTG
ESN.
APA -RATED
SHEATHING W/
ad 6 EDGES
4 12" FIELD
16d a EA TRUSS
2X SOLID BLKG.
RAFTERS
SHEARUALL
TO MATCH
BELOW
NAIL BLKG.
TO STUD
SHEARWALL
51— IEARUJALL EXTENSION
l( >H
PREPARED BY
Client
Loco
Calculation By
C_mment
L M
E{ E A M A .N A L
Suntel Design
Ti ard, Oregon
SUNTEL DESIGN
`rMHILL REVISION
l6' GAR6Or DR HDR
BEAM AND LOAD DIAGRAM
P1
I S
MIMMIMMMORIMEMMIMMIMMIMMIMMMIMM
Nln
Reacticn R1 5, 16) 0 lbs Reaction R2 5,16() 0 lbs
Tctal load 1() 020 0 lbs
Dimensi:ns Clear span 16 feet, no
Pint loads. P1 2,O(0 0 lbs at 8 0 feet
No triangular lo.-'ads
UnifDrm beam weight= 20 lbs /if C lbs total)
Uni f rm loads 01 500 0 l bs/ l f at C 0 feet i s 16 f feet
Deflection limit (live l:ad plus dead Toad) 1/210
BEAM TYPE LAM F GLULAM
COMPUTED STRESS TRAIN DESIGN JAL PROPERTIES REQUIRED ACTUAL
Shear (lbs) S 160 0 FY 165 0 Area, i.'S In
Moment 'ft-lbs) 24,640 0 FB 2,400.0 Sect.Mrdulus
,a
Dflectic�n (in) 0 8n E 90E6 Nom Inertia
Actual Ma imam Deflecti C? B( inches
Ma imuM Deflection occurs at 8 0 feet
Ma imam Moment Jccurs at S n feat
Size Factor 1 000
MINIMUM BEAM SIZE (W
MINIMUM BEAM AREA (Sq In 61 55
47
.1.
7=6
G:
123*
740
DETERMINING FACTOR
I► 1.12 r'° 9=0 1 c 1
S/ X /3%
c?1A
A-
77
)'F.7
SE4.
;1 C.: W ES 0fliAIN:W
tue.. e ES4
SE ILJT
,sa4- wnwT Fw
se ,so oT ek
-7 ,14 u_T seb
0 EE
BC aw
ee c
p'i peep s T 7.?:''' E TT TwT u:T:aT,I..e3
EPE-
7 j: ,n5 Et- lin: S I, .1. _.r
spe: ,LJT_Id N
Mor—LESEEELLT"Thoomr-2137EMELIMEE
A 1 E
s_PEdE 'SE Eu ew
C.1
_k'EcE nd
1
E'T!
a4uns
ift ESC?
W I E U:T 1 E- it:
e_:T
d
ueTT
r1' 4 r e
H
g
OH
PREPARED BY Suntel Design
Tigard, Oreq_
Client SUNTEL DESIGN
Prc.je :t YAMHILL PLAN
L :cati_'n BEAM AT NOOk•
Calculati:n By L M
C mmjen t
B E A M A N A L Y S I S
BEAM AND LOAD DIAGRAM
P1
rii <ii iii ii iii iii Iii iii
R1 R.
Reacti'_n R1 2,303 2 lbs React.i:n R2 3,6 S lbs
T_ital 1 _gad 5,985 lbs
Dimensi :'ns Clear span 3 fjeet, no overhang
Point l _'ads P1 1 300 o lbs at 5 0 feet
No triangular lmads
Unit'rm beam weight= 15 lbs /if 135 lbs total)
Unifprm loads U2 7 50 t) lbs /lf at 4 Cs feet tc 3 t) feet
U1 .71) lbs /lf at 0 0 feet to 4 t) Feet
Defle_ti :n limit live 1_am' plus dead 1nad) 1 /3St_
B=mM T (PE LAM 24 F GLULAM
COMPUTED STRESS STRAIN DESIGN 'AL PROPERTIES REQUIRED ACTUAL
Shear (lbs) 3, 875 8 F 165 Area Sq I n 30 48
M_mjen'b (ft -lbs) 8 580 0 F8 2,40) Sect M 'duius 40 58
Deflecti_n (in) t) 0m> E 1 80E5 Mom Inertia 208 SUS*
Actual Ma imum DeflectiDn Do inches
Ma imum Defle:ti:n =_ura at 4 5 feet
Ma imum M_'ment occurs at 5 u feet
MINIMUM BEAM SIZE (W Hr
�¢r tD 1
MINIMUM BEAM AREA Sq In 48 48
6 c *'X 7'
PREPARED BY
[.lient
Project
L:caticn
Calculation By
C:imment
Suntel Design
Tigard, Oregon
SUNTEL DESIGN
YAMHILL REVISION
L M
No pint loads
Nc triangular 1
UnifLrm beam weight=
Uniform loads U1
BFAM ANALYSIS
BEAM AND LOAD DIAGRAM
��D0��00�0��0000000
mmnsmma�mmmmmmmmm�m
Reactirn R1 587 5 lbs
Total load 5,175 d lbs
Dimensi:ns- Clear span
wmmn*mn« .mmWIIMmnM!
R1
P
Reartion RC ,,587 5 lbs
o
9 feet, no overhang
15 lbs/lf in lbs t tal)
56o V lbs/lf at 0 0 feet t-
DeflectiLn limit (live l:ad plus dead load) 1/Jb0
o
feet
BEAM TYPE WOOD FIR/LARCH GX #1
LOMPUTED STRESS/STRAIN DESIGN VAL PROPERTIE REQUIRED ACTUAL
Sher (lbs) 2.,587 5 FV 85 0 Area Sq In 1G
Moment (ft-lbs) 5,821 D FB 1,150 0 Sect Modulus 5:
Deflectipn (in) 0 38 E 1 b0E6 Mum Inertia 176
Actual Maximum Deflecti n 20 inches
Maximum Deflectipn )ccurs at 1 5 feet
Maximum Moment JcL/os at 4 5 feet,
MINIMUM BEAM SIZF (W x H)
MINIMUM BEAM ARFA (Sq In 45 56
46*
63
4.bx_
10H
PREPARED BY
Client
Project
Locat``"
Calculation By L n
Comment
BEAM ANALYSIS
Suntel Design
n
SUNTEL DESIGN
YAMHILL REVISION
PM UNDER LEFT DORMER WALL
BEAM AND LOAD DIAGRAM
�0�N000�00�0�����0�00
mmmmm�mmmmmmmmmmmmmmm
Reacticn R1 2, o lbs Reacticn Ri 2,075 0 lbs
Total l 4 150 0 lbs
Dimensicns �lear span 1u u feet, no overhang
No point lDads
Nc
triangular lc ads
Unif:,rm Beam weight= 15 lbs/lf 150 lbs tctal)
Unif:rm lDads 01 400 0 lbs/lf at 0 o feet t: 10 0 feet
Deflection limit (live lDad plus dead load) 1/240
BEAM TYPE WOOD FIR/LARCH 6X #1
COMPUTED STRESS/STRAIN DESIGN VAL PROPERTIES REQUIRED ACTUAL
Shear (lbs) 2,075 0 FV 35 0 Area (Sq In
MDment /ft-lbs` 5,187 5 FB 1 J50.V Sect.Modulus 46
Deflection (in) 0 50 E l 6VE6 Mom Inertia 116
Actual Ma imum eflecti:n o 06 inches
Maximum Deflection pccurs at 5 0 feet
Maximum Moment occurs at 5 0 feet
MINIMUM BEAM SIZE (W H)
MINIMUM BEAM AREA (Sq In
33 01
46*
164
1)H
6
PREPARED BY
Client
Pr
L�cat``n
CaIculatiDn tly
Comment
Shear (lbs)
Moment (ft-lbs)
Deflection (in)
Suntel Design
n
SUNTEL DESIGN
Y�MHILL REVISION
RM UNDER LEFT BONUS RM WALL
L r�
B EAM ANALYSIS
BEAM AND LOAD DIAGRAM
mmmmmmmmmmmmmmmmmmmmm
1,275 0 FV D5 0 Area (So In
J 187 5 FB 1,000,0 Sect.MDdulus
So E l 70E6 Mom Inertia
Reac ipn R1 1 7 75 0 lbs Reacti:n R2 1,275 0 lbs
T:tal 1:ad lbs
DimensiDns Clear span 10 0 feet, no cverhang
No point loads.
Nc loads
Uniform beam weight= 15 lbs lf 1 50 lbs tctal)
Uniform loads 01 24( 0 lbs/lf at 0 0 feet to 10 0 feet
Deflecticn limit (live l:ad plus dead load) 1/240
BEAM TYPE WOOD FIR/LARCH 4X #1
COMPUTED STRESS/STRAIN DESIGN VAL PROPERTIES REQUIRED ACTUAL
Actual Max mum D eflecti n 0 22 i h s
Maximum
ax mum De lectDn occurs at 5 0 �ee�
Maximum Mcment ccurs at 5 0 teet
MINIMUM BEAM AREA (Sq In 28 34
20
.28
38*
1
"7"
10H
PREPARED BY
Client
Project
L ica €.t n
Calculation i`y
Comment
L 1'i
B E A M A N A L Y S I S
Suntel Design
Tigard, OreU
SUNTEL DESIGN
YAMHILL REVISION
MAIN GARAGE BEAM
BEAM AND LOAD DIAGRAM
P 1 P:
IIIIII IIIIIIIII IIIIII IIIIIIIII IIIIII IIIIIIIII I =IIII IIIIIIIII IIIIti =III III U
111 1 Ih.il 4i i!f!; itf P. I I i,,. .11
R1 Ri
Reaction R1 6,945 4 lbs Reaction R2 6,:23 6 lbs
T_ to l l _;ad 13 0 lbs
Dimensi:'ns L1ear span 13 C) feet, no cverhang
P :int 1 =ads P1 1,200 a lbs at 8 0 feet
P2 1., 000 00 0 lbs at 10 0 feet
No triangular l:'ads
Unif:rm 6eam weicht= 25 lbs /if 475 lbs t:tal)
Unif:rm lcfads El 50o ii .lbs /if at 0 0 feet t: 13 0 feet
Deflecticn limit (live lcad plus dead load) 1/240
BEAM TYPE LAM -4 F GLULAM
COMPUTED STRESS /STRAIN DESIGN VAL PROPERTIFS REQUIRED ACTUAL
Shear (lbs) 6,945 4 FV 165 0 Area (Sq In
Moment (ft -lbs) 84,803 9 FB 2,400.0 5ecL.M .f ?f1s
Deflecti_n (in) 0 3s E SOE6 Mom Inertia
Actual Ma imum Defle :ti 'n 0 94 inches
Ma imum Deflecticn occurs at 9 5 feet
Maximum Moment c curs at 10 U feet
Size Fact:- 0 980
MINIMUM SEAM SIZE (W x H)
DETERMINING FACTOR
1 53 1 4 1
MINIMUM BEAM AREA (Sq In 70 83
74
178*
1,280
l0H
PREPARED BY
Client
Project
Lzcaf`
Calculatipn 6y
Cumment
Shear 'lbs)
Moment (ft-lbs)
Deflecticn (in)
BEAM ANALYSI
Suntel n si n
SUFTEL DESILIN OreQcn
YAMHILL REVISION
p'MAnARF DR HDR
L M
BEAM AND LOAD DIAGRAM
00��0�00U0000�0�0
mwmmmmmmummmmmmmw
Reaction, R1 860 0 lbs ReactiDn R2 860 0 lbs
Tctal lDad 1.720 0 lbs
Dimensicns Clear span 8 V feet, no Dverhang
No point lcads.
No triangular lc ads
Uniform beam weight= 15 lbs lf 120 lbs total)
Unif:rm loads 01 200 0 lbs/lf at 0 0 feet to 8 o feet
Deflection limit live load plus dead load) 1/24o
BEAM TYPE WOOD FIR/LARCH 4X #1
COMPUTED STRESS/STRAIN DESIGN VAL PROPERTIES REQUIRED ACTUAL
860 0 FV 95 0 Area (Sq In
1,72) J FB 1,000.) Sect.Modulus
0 40 E 70E6 Mom Inertia
Actual Maximum Deflection 0 inches
Maximum DeflectiDn Dccurs at 4 feet
Ma imum Moment cccurs at 4 0 feet
MINIMUM BEAM SIZE (W H)
MINIMUM BEAM AREA (Sq In 20 82
X|0 1.%F~
21*