HomeMy WebLinkAbout1015 Cathleen St Technical - BuildingTECHNICAL
Permit 0l- 15/4
0 L5 Ca*() s een Sf
Address
Project description New Svw 4xri)
Residence
Date the permit was finaled OZ Z�-09
Number of technical pages (9g
PLAN 3695
FOR
Su tel Home l esign
In return for payment of a one -time fee, ate/i Architecture Engineering, Inc. grants
you a hunted license to use the Analysis to construct one single house a the address shown
below This lateral analysis is not to be used, for any master plan approval process.
Site Location. Lot 1015 Cathleen St, Port Angeles, WA. Only
Copyright: 9895
NOTICE: If the Building Department accepts' the Analysis without an engineer's
original "wet- stamp" seal signed with red ink or for different site location than shown above,
then it is agreed that such Building Department accepts total liability out of or in connection
with this Analysis.
CALCULATIONS, SHEAR SHEET, L -SHEET VALID ONLY WITH
ORIGINAL STAMP HERE AND DIGITAL STAMP ON PLANS
AND
CAN NOT BE USED
\0
AFTER
December 2007
w 130
X f \\65\C5
'06\
022;y0
Designs Engineering, Inc
LIABILITY LIMITATIONS
OWNERSHIP OF DOCUMENTS
Project. Waverly
File #3695 100D -D2 WA
Client: Suntel Home Design
By RF
Date 6/2005
Job No 1844
F ANAlYSIS
ANALYZE BUILDING FOR ONLY WIND SEISMIC FORCES
according to the
2003 INTERNATIONAL BUILDING CODE
WIND ANALYSIS FOR EXPOSURE "D lc o.¢, -A,(3 -sec Gust)
SEISMIC ANALYSIS FOR ZONE D2
e GGite/ti Designs Engineering, "FDE was retained in a limited capacity for this project. Design is
based upon information provided by the Client, who is solely responsible for accuracy of same No responsibility
and liability is assumed to FDE for items beyond that shown on these sheets. No construction observations nor
soils investigations performed by FDE
INDEMNIFICATIONS BY BUILDING DEPARTMENT
Sheet No
1 /11.
Building Department agrees to defend, indemnify and hold harmless FDE from any loss, costs, damage,
expense, including attorney fees upon trial or appeal, for liability arising out of or in connection with
FDE's Analysis unless Analysis is used for specific site location shown on cover nave and contains an
original engineer's "wet- stamp" seal signed with red -ink (no photocopy allowed).
All documents produced by FDE shall remain the property of FDE and shall not be used unless accompanied by ar
original engineer's wet -stamp issued from FDE
Designs Engineenng, Inc
Project: Waverly
File #3695- 100D -D2 -WA
Client: Suntel Home Design
By RF
Date 6/2005
Job No 1844
LATE L ANALYSIS
LIABILITY LIMITATIONS
OWNERSHIP OF DOCUMENTS
ANALYZE BUILDING FOR ONLY WIND SEISMIC FORCES
according to the
2003 INTERNATIONAL BUILDING CODE
WIND ANALYSIS FOR EXPOSURE "D" ‘oo,4 r(3 sec Gust)
SEISMIC ANALYSIS FOR ZONE D2
g ritdie .Designs Engineering, "FDE was retained in a limited capacity for this project. Design is
based upon information provided by the Client, who is solely responsible for accuracy of same No responsibility
and liability is assumed to FDE for items beyond that shown on these sheets. No construction observations nor
soils investigations performed by FDE
INDEMNIFICATIONS BY BUILDING DEPARTMENT
Sheet No
Ito
Building Department agrees to defend, indemnify and hold harmless FDE from any 1r3s, costs, damage,
expense, including attorney fees upon trial or appeal for liability arising out of or m connection with
FDEts Analysis unless Analysis is used for specific site location shown on cover pane and contains an
original engineer's "wet stamp" seal sianed with red -ink (no >,hotoconv allowed).
All dociunents produced by FDE shall remain the property of FDE and shall not be used unless accompanied by ar.
original engineer's wet stamp issued from FDE
Designs Engineermg, Inc
1 1
11111
11
111111111111111111 1!1!!!'11114111
I
11111111 1111111111111111111111111t111111. 1111111111■ 1 I ni
111111111111 11.
11)111111MT I 11111111111111111111091,111, 111111
MIRE
NM III 11
111111111111111111111111111111111111111
1114 'T MEI EMIRS
Ill I 11
III 111 11
11 I 11 1 1.-..--1 11 '.........,...r....
iiimimmic A
1 1171931!--.-
I li-:111111111 L Ill
IIIIIE• UMW IIEBIU1=1
mowsr. osur...a
s
i i aims
VENNI Aim
MIIMINiP ”'RRIPIRK.1111•1
1111111-1110111111), •ssasissi c Intl ma NOME I '.1.2flonsautoug Jr.
i11111 mom ,`LNINI:Vigrammot......
:111111&, ."i.■?: 2"
Alc,cl Ita
ICA4 X V MILT
COM' ROOFING OVER
ONE LAYER 15.' 4-9P EASE
OVER I/2" COX MD 9141'0
Z..=
Project. Waverly
File #3695-10,0D-D2-WA
Client: Suntel -Tome Design
rLL
JML:LT CLLNATIc
11111111
15T_ELE_LM
2.1A1,_ELE_LNE
1 _A_ 1
By RF
Date 6/2005
Job No 1844
••1_.1, ic::),S t.i
B
Sheet No
ILL. APT
MACK
Project. Waverly By RF Sheet No
File #3695- 100D -D2 -WA Date 6/2005 J
Designs Engineering, Inc Client: Suntel Home Design job No 1844
SCALE. I/8
rl 1
r
V A 0
1sT _ELER_LIN
5/4 X IGa'!..8LT
0
A V A 0
SCALE. 1/8 1 -D'
2LlP FL,f3L,IN
I I
CD
SPACE ROOF 51 -ITHG FAS RS AT 6 O.C. AT ALL INTERMEDIATE
FRAMING MEMBERS EACH IDE OF EACH RIDGE, HIP AND WITHIN
A 5 -0' WIDE NAILING ZON AROUND THE ENTIRE PERIMETER OF
THE HOUSE (NAILING ZONE WIDTH STARTS AT EDGE OF ROOF)
FASTEN EA. TRUSS TO TOP
WALL PLATE W/ SIMP 'H6
4 EA. STUD TO TOP WALL
WI SIMP 'SP2
C X ID A
I I 1 ii I I I I I I I il I I
E> S} IEA WA1 L
TC R O 1 7 F I I 1 ii I I I I I I 1 I L—
dHEA�THIr�"�
I II I I 1 I I II 1 I --1. I I 1 11 1 L-
I II �4,1M. H I I I i I I
I II _I1_ -I I I- I I
_0C ATE 4 T �IRECTI 1__ .9 II I I I `1 1 II—
aBC vE )IOLDOU.N BELOW. .I
If ii -II 11 1 I I I 1 _II I I II i1 I 11
ul! I I I I I t_ I
II
1 1 �I I
h r11 _Al 1 i I 1 IF
III 1 II. J ��I- I I I 1 1 1 11 I
_i 1 III I I I 111 I I_
-------------1 H I I I 1 1 I i
I; i l
I T l
MSTC4O EA. SIDE
OF PORCH. FASTEN
BEAM TO SOLID
WALL BLOCKING
CI- IMNEY DESIGNED
Bl OTHERS
tl)
a
0
a
v.
z
Designs Engineering, Inc
f
Fj
.1 I
II
Project Waverly
File #3695-100D-D2-WA
Client Suntel Home Design
_I_
t PARIPIPiR
91 .4113PPRAPRIIIINYN 1 T;
1RP MAR, 911111PR MI RIPPIPIRTRIIII
N
N
By RF
Date 6/2005
Job No 1844
Sheet No
5
1
r
3
Designs Engineering, Inc
K
011 ,121,111'1!di I hIrl. ';.1:1
9
Project. Waverly
File #3695 100D-D2-WA
Client Suntel Home Design
f
el 1 I
I I
I I
I I
1 I
1 4 1
r -1
L
L
By RF
Date 6/2005
Job No 1844
Nk.
Magagfi.klaillahliaalar" "741.
rim')
Sheet No
Project: Waverly By RF Sheet No
File #3695 100D -D2 -WA Date 6/2005
Designs Engineering, Inc Client Suntel Home Design Job No 1844 (n
WIND ANALYSIS USING 2003 IBC SIMPLIFIED WIND METHOD
Data.
W Total Wind Force =Yx Ix P x A
Y• =161 I =10
FRONT REAR WALLS
Zone Horizontal Pressure
SIDE WALLS
A Pa 17 8 psf
B Pb 12.2 psf
C Pc 14.2 psf
D Pd 9 8 psf
Distribute wind force to roof and second -floor level
Reference 2003 IBC Figure 1609 6.2.1
Projected Area
Aa 85
Ab =0
Ac 420
Ad• =0
W Y I (Pa Aa +Pb•Ab +Pc Ac +Pd Ad) W 1.2x 10 pounds
Distribute wind force to roof and second -floor level
FRw1 Y I (0 5 Pa Aa 1 0 Pb•Ab 0 5 Pc Ac 1 0 Pd Ad) FRwl 6 02 x 10 lbs
F2w1 Y I (0 5 Pa Aa 1 0 Pb•Ab 0 5 Pc Ac 1 0 Pd Ad) F2w1 6 02 x 10 lbs
Zone Horizontal Pressure Projected Area
sq ft.
sq ft.
sq ft.
sq ft.
A Pa 17 8 psf Aa 85 sq ft.
B Pb 12.2 psf Ab 30 sq ft.
C Pc 14.2 psf Ac 620 sq ft.
D Pd 9 8 psf Ad 260 sq ft.
W Y I (Pa Aa Pb•Ab Pc Ac Pd Ad) W 2 13 x 10 pounds
FRw2 Y I (0.3 Pa Aa 1 0 Pb Ab 0 3 Pc Ac 1 0•Pd Ad) FRw2 9 67 x 10 lbs
F2w2 Y 1 (0 7 Pa Aa 0 0 Pb•Ab 0 7 Pc Ac 0 0 Pd Ad) F2w2 1 16 x 10 lbs
Designs Engineering, Inc
SEISMIC ANALYSIS USING 2003 IBC SIMPLIFIED ANALYSIS PROCEDURE
Data. 1 =1 0 Sd 1 30 R 6 5 r 0 45 (worst case)
E Earthquake Base Shear 1.2 p Qe 1 4 1.2 p (Sd W/ 1 4R)
Weights
Mass Calculations.
Roof Dead Load 15 psf (Composition Roof Covering)
Floor Dead Load 10 psf
Partitions 10 psf
Exterior Walls Windows 10 psf (Average)
Aroof 1500 ft ^2
A2ndFloor 1250 ft ^2
AlstFloor 1800 ft ^2
h2 21 ft
Mroof 20•Aroof 10 Aroofwall
M2 20 A2ndFloor 10•A2wall
p• =2—
20
r•V A2ndFloor
E 1.2 p. Sd (Mroof M2) E 1.3 x 10 pounds
14R
Distribute Seismic Shears
D Mroof h2 M2 hl
Project. Waverly
File #3695- 100D -D2 WA
Client: Suntel Home Design
By RF Sheet No
Date 6/2005
Job No 1844 .1(
Aroofwall 700f1^2
A2wall 1400 ft^2
A 1 wall 0 ft ^2
hl• =10ft
Mroof 3 7 x 10 pounds
M2 3 9 x 10 pounds
p =if(p< 1,l,p)p= 1
D 1 17 x 10
FRe Mroof h2 E FRe 8 67 x 10 pounds
D
M2 hl
F2e D E F2e 4 35 x 10 pounds
Designs Engineering, Inc
Project Waverly
File #3695- 100D -D2 -WA
Client: Suntel Home Design
By RF
Date 6/2005
Job No 1844
INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH
Analyze entire brace wall line as a series of perforated shearwall panels using worst -case "maximum opening
height ratio Individual perforated shearwall panels extend between plan discontinuity Overturning for such
panel is calculated by rational analysis. Reference Section 2305 3 7.2 2003IBC
Unadjusted in -plane shear force for brace wall line, FRe 2950#
Percent full height sheathing 8 ft. 16 ft 50%
Maximum opening height ratio 4ft 8 ft 0 50
Shear resistance adjustment factor, Co 0 8 (Ref: Shear resistance adjustment factor table)
Amplified in -plane shear, V Unadiusted shear force for brace wall line
Shear resistance adjustment factor x Total length of full- height walls
FRe (Co x L) 2950# (0 8 x 8 ft) 460 plf
Uplift at perforated shearwall ends calculated based on rational analysis (use only 50% of weight
of first individual full- height wall segment for dead load)
2/3 average weight of full height wall segments and portion of roof framing, Wd 110 plf
2/3 dead -load reaction at end of shearwall or corner restraint, Rl 400#
Uplift at end of perforated shearwalls, Pu Vf x hl Wd x (0 5 LI) Rl
460 plf x 8 ft 110 plf x (0 5 x 4ft) R1 3100#
Uplift between wall ends, t V- Wd 460 plf 110 plf 350 plf
Wall bottom plate (1 1/2" thickness) to rim joist.
Use 16d common nails (0 162 by 3 1/2 inches)
Lateral resistance 1 33 x 141# 187# per nail
Withdrawal resistance 1 33 x 40 ph x 2 5" 133# per nail.
Nails for shear transfer 460 plf 187# per nail 2 4 nails per foot
Nails for uplift transfer (460 -110 plf) 133# per nail 2 6 nails per foot
Net spacing for shear and uplift 2 4" o c
Sheet No
L,
Rim joist to wall top plate
Use 16d common nail (0 162 by 3 1/2 in.) toe nailed to provide shear transfer
Lateral resistance 0 83 x 187# per nail x 1 5 nails per ft. 230 plf (150# per nail default maximur
for seismic loads) plus Simpson "LTPS" framing clip capacity 630#
Net spacing for shear using LTP5 clip and 16d toenails at 8" o c 630# (460- 150 24" o c
Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor
wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced
moments and shears Continuity of load path is provided by holdowns at ends of the perforated shear wall
Use Type "C" shearwall w/ HTT22 holdowns. 16d at 2 1/2" o.c. sole plate nailinu and LTP5 elms at 24" o c
Designs Engineering, Inc.
RI 400"
FRe 2950"
INOLI OWN
Pu 3100"
4 -0'
P.S.UJ. Segment
WALL HEIGHT
8' -0'
Percent Full Height Sheathing
100
20%
30%
40%
50%
60%
10%
80%
Project: Waverly
File #3695- 100D -D2 -WA
Client: Suntel Home Design
m'
Perforated Shear Wall
4 -0'
P.S.W. Segment
By RF
Date 6/2005
Job No 1844
MAXIMUM OPENING HEIGHT RATIO AND HEIGHT
H/3 H/2 2H/3 21-1/6 H
2' -8' 4/ -0' I 5 -4 6 -8' 8' -0'
Shear Resistance Adjustment Factor
10 0.69 0.53 043 0.36
L0 011 0.56 045 0.38
1.0 014 0.55 045 042
1.0 011 0.63 0.53 045
I.0 0.80 0.61 0.51 0.50
Im 0.83 011 0.63 0.56
1.0 0.81 011 0.69 0.63
1.0 0.91 0.83 011 011
ELEVATION OF PERFORATED S- E4(RUJ4LL
SMEAR RESISTANCE ADJUSTMENT FACTOR
Sheet No
1b
Designs Engineering, Inc.
INVES fIGATE UPPER -FLOOR SHEARWAL,L,S.
Line "A"
Rear Walls
Line "C"
Front Walls
Project. Waverly
File #36951.00I) -D2 -WA
Client: Suntel Home Design
By RF
Date 6/2005
Job No 1844
Sheet No
II t 1(P
Summation of full- height walls lengths L 33 ft.
Total length of brace wall line TL 48 ft.
full- height sheathing S L 100 S 68 75 percent
TL
Diaghragm stress v 0 5 FR v 90 36 plf
TL
Shearwall stress v 0 5 FR v 164.29 plf
Weight Wd 110 plf
Uplift for shearwall. length L1 3 ft. R1 400
(worst case)
Pu v 8 5 Wd L1 R1 Pu 749 33 pounds
08L
Use Tvoe "B" Shearwall w/ no holdowns
Summation of full height walls lengths L 20 ft.
Total length of brace wall line TL 19 ft.
full- height sheathing S 100 S 105.26 percent
TL
Diaghragm stress v 0 5 FR v 228.28 plf
TL
Shearwall stress v 1 75 0 5 FRe v 379 51 plf
(Seismic) L
Uplift for shearwall length L1 2 ft.
(worst case)
Pu• =v8– 5 WdLI –R1
Use Tune "C" Shearwall w/ MSTC52 hold.owns
Weight Wd 110 plf
R1 400
Pu 2 53 x 10 pounds
Designs Engineermg, Inc
INVESTIGATE UPPER -FLOOR SHEARWALLS.
Line 1 Walls
Line 2 Walls
Project. Waverly
File #3695 100D -D2 -WA
Client: Suntel Home Design
Summation of full- height walls lengths L 16 ft.
Total length of brace wall line TL 17 ft.
full- height sheathing S T 100 S 94 12 percent
Diaghragm stress v 0.2 F R v 113 82 plf
TL
Shearwall stress v 0.2 FR
L
Uplift for shearwall length L1 15 ft.
(worst case)
Pu• =v8— 5 WdLI —R1
Use Type "B" Shearwall w/ no hol.downs
Shearwall stress v 0 5 FR
L
Uplift for shearwall length Ll 11 ft.
(worst case)
Pu v 12 5 Wd Ll R1
Use Tyne "B" Shearwall w/ MSTC40 holdowns
By RF
Date 6/2005
Job No 1844
Sheet No
2/
v 120 93 plf
Weight Wd 110 plf
R1 400
Pu —257 53 pounds
Summation of full- height walls lengths L 24 ft.
Total length of brace wall line TL 27 ft.
full- height sheathing S L 100 S 88 89 percent
TL
Diaghragm stress v 0 5 F v 179 16 plf
TL
v 201 56 plf
Weight Wd 110 plf
R1 400
Pu 1 41 x 10 pounds
eet, Project. Waverly By RF Sheet No
File #3695- 100D -D2 -WA Date 6/2005 13/
Designs &Engineering, Inc. Client. Suntel Home Design Job No 1844 1 (p
INVESTIGATE UPPER -FLOOR SHEARWALLS.
Line 3 Walls Summation of full- height walls lengths L 24 ft.
Total length of brace wall line TL 24 ft.
full height sheathing S 100 S 100 percent
TL
Diaghragm stress v 0.35 F v 141 09 plf
TL
Shearwall stress v 0.35 FR
L
Uplift for shearwall length L l 23 ft.
(worst case)
Pu =v8 —.5 WdLl —R1
Use Tyne "B" Shearwall w/ no holdowns
v 141 09 plf
Weight Wd 110 plf
Rl 400
Pu 536.29 pounds
Designs Engineering, Inc
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Rear Walls.
Line A
Front Walls
Line B
Project Waverly
File #3695- 100D -D2 -WA
Client Suntel Home Design
Summation of full height walls lengths L 18 ft.
Total length of brace wall line TL 35 ft.
full- height sheathmn.g S L 100
TL S 51 43 percent
Diaghragm stress v 0 3 F2w1 v 51 59 plf
TL
Rim/blocking stress v 0 5 FRwl 0 5 F2w1 v 171 97 plf
TL
Seismic Shearwall v 1 75 (0 5 FRe 0 5 F2e) v 633 33 plf
stress w/ wall aspect L
ratio penalty
Shearwall stress v 0 5 FRe 0 5 F2e v 361 9 plf
L
Uplift for shearwall length Ll 2 ft
(worst case)
Pu v 9 5 Wd L1 R1
Tyne "C" Shearwall AND Tvne "D" Shearwall at narrow width walls w/ H'I"T22 holdowi
Summation of full- height walls lengths L 14 ft.
Total length of brace wall line TL 45 ft.
full- height sheathing S L 100 S 31 11 percent
TL
F2w1
Diaghragm stress v 0 3 v 40 13 plf
TL
Rim/blocking stress v 0 5 FRwl 0 5 F2w1 v 133 76 plf
TL
Seismic Shearwall 1 75 (0 5 FRe 0 5 F2e)
v v 814.29 plf
stress w/ wall aspect L
ratio penalty
Shearwall stress v 0 5 FRe 0 5 F2e v 465 31 plf
L
Uplift for shearwali length L1 2 ft.
(worst case)
Pu v 9 5 Wd Ll R1
By RF Sheet No
Date 6 /2005 14 f
Job No 1844
Weight Wd 110 plf
R1 400
Pu 2 75 x 10 pounds
Weight Wd 110 plf
R1 400
Pu 3 68 x 10 pounds
Use T vne "E" Shearwall w/ PIID6 holdo \wns AND Garage Frame Detail
Designs Engineering, Inc
Project: Waverly
File #3695- 100D -D2 WA
Client. Suntel Home Design
INVESTIGATE LOWER -FLOOR SHEARWALLS.
Line 1 Summation of full height walls lengths
Total length of brace wall line
L =26 ft.
TL 25 ft.
full height sheathing S L 100 S 104 percent
TL
F2w2
Diaghragm stress v 0.25 v 116 27 plf
TL
0.2 FRw2 0.25 F2w2
TL
Rim/blocking stress v
Shearwall stress v
Tvne "B" Shearwalls w/ no holdowns
Shearwall stress v
Uplift for shearwall length L1 8
(worst case)
Pu• =v9— 5 WdLI Rl
0.2 FRw2 0.25 F2w2
L
By RE
Date 6/2005
Job No 1844
Sheet No
1r
Ili
v 193 67 plf
v 186.22 plf
Weight Wd 110 plf
Uplift for shearwall length L1 25 ft.
(worst case) R1 400
Pu v 9 5 Wd L1 R1 Pu —99 01 pounds
Line 2 Summation of full- height walls lengths L 25 ft.
Total length of brace wall line TL 19 ft.
full height sheathing S TL 100 S 131 58 percent
F2w2
Diaghragm stress v 0.25--- v 152 99 plf
0 5 iZw2 0 5 F2w2
Rim/blocking stress v v 560 58 plf
TL.
0 5 FRw2 0 5 F2w2
L
Tyne "C" Shearwalls w/ HTT22 holdowns
ft
v 426 04 plf
Weight Wd 110 plf
R1 400
Pu 2 99 x 10 pounds
Designs Engineering, Inc
Project: Waverly
File #3695- 100D -D2 WA
Client: Suntel [tome Design
INVESTIGATE .LOWER -FLOOR SHEARWALLS.
Line 3
Summation of full- height walls lengths L 24 ft.
Total length of brace wall line TL 28 ft.
full- height sheathing S L 100 S 85 71 percent
TL
F2w2
Diaghragm stress v 0 35 v 145.34 plf
TL
Rini /blocking stress v 0 35 FRw2 0.35 F2w2 /blocking 266.27 plf
TL
Shear�xall stress v 0.35 FRw2 0 35 F2w2 v 349 05 pif
0 89 L
Uplift for shearwall length L1 11 ft.
(worst case)
Pu v 9 5 Wd Ll Rl
Type "C" Shearwalls w/ HTT22 holdowns
By RF
Date 6/2005
Job No 1 844
Sheet No
1 l t,0
Weight Wd 110 pif
R1 400
Pu 2.14 x 10 pounds
Architecture Engineering, Inc
a
EI
D
6
El
10
Project: Structural Notes
Location. Pacific Northwest
Copyright 1993
OWNERSHIP OF DOCUMENTS
By RF Sheet No
Date l /2007 A.
Job No 7000
The "diamond" shearwall designation system details were created by
Fuller. Architecture Engineering, Inc. (FAE) and are copyright protected
property of FAE and shall not be used unless issued from FAE
Copyright 1993
LEGEND
1
DRAWING NOTES
'SIMSPON 'I U" TWE BEAM HANGER
SIMPSON GLB' TYPE BEAM HANGER
DESIGNATES GRID LINE
DESIGNATES DETAIL MARK
DESIGNATES SHEARWALL TYPE
DESIGNATES HOLDOWN TYPE
(SEE SHEAR SCHEDULE)
PERFORATED SHEARWALL
SEE DETAIL #30
DESIGNATES DRAWING NOTE
DESIGNATES H.D LOCATION (APPROXIMATE)
SIMSPON 'HUxx TYPE BEAM HANGER
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'EPC' TYPE POST CAP
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'ECC' TYPE POST CAP
(3) 2 x (WALL WIDTH) BUNDLED STUDS TO SUPPORT ROOF FRAMING ABOVE.
SIMPSON 'MSTC52' FASTENED TO DBL. JOISTS OR BEAM. SEE DETAIL 6
DOUBLE FLOOR JOISTS. NAIL FLOOR SHEATHING TO EACH JOIST WITH (2) ROWS
10d COMMON NAILS AT 6' O.C.
13 A 'DRAG SHEAR TRUSS' DESIGN TRUSS FOR 150 PLF DIAPHRAGM SHEAR
TRANFERRED FROM TOP TO BOTTOM CHORDS THROUGH THE WEB MEBERS WITH CUMULATIVE
FORCE RESISTED AT ONE END OF THE BOTTOM CHORD.
(2) STUDS UNDER BEAM CONTINUOUS DOWN TO FOUNDATION.
Ardhitecture Engineering, Inc.
SHE4RW4LL SCHEDULE
MARK WALL COVER FASTENERS e PANEL
EDGES
5/8 G.W.B.
6d WALLED
NAIL OR 1
'W" d6 SCREW
1 /I6" A.PA. I6GA STAPLE
RATED SHT'G 0.131 "4 x 21/4'
0.148 "4 x 2
1/I6 A.PA.- 0.131 "4 x 2
RATED 5I-IT'G 0.145 "4 x 21/4" 4" OC.
F RH. P -NAIL
\D 1/l6" A.PA:
RATED SHT'G
/E\ 1/16" A.P.A.
RATED SHT'G
EACH SIDE
1/16 A.P.A.
RATED SHT'G
EACH SIDE
kOLDOLUN SCHEDULE
"X" DESIGNATES SIMPSON PRODUCT
MARKI HOLDOWN I FASTENERS
NO
HOLDOWN
REQUIRED
i "MSTC40'
'CMSTI2 (43) I6d SINKER
\4/ 9 -0 "LONG NAILS AT EACH END
'MSTC52
'MSTC66"
"PHD -5"
-OR
'HDU -4
"HTT22
-OR-
"HDU -5
'PHD6
'HDU 8
-OR
'HDQ -S
0.145" 4 x 21/4"
FULL ROUND-
HEAD P -NAIL,
0.148 x 21/4"
FULL ROUND 4" O.G.
HEAD P -NAIL,
0.1484x2
ULL ROUND- STAGRD
EAD P -NAIL,
(IS) I6d SINKER
NAILS AT EACH END
(24) 16d SINKER
NAILS AT EACH END
(34) I6d SINKER
NAILS AT EACH END
SIMPSON "SSTB24"
SIMPSON "SSTB24"
3IMPSON 'SSTB28
SIMPSON 'SSTB28
(I5)(I6) SIMPSON 'SSTB26"
'IDU -II or W/ 9/64 CUT WASHER
"Hl- IDQII" 4 HEAVY HEX NUT'
(15)(16) 1" DIA. (A35) GALV
'H1-1DQI4 ROD EMBED 8" INTO
12 THK x 21' WIDE
10' -0" LONG FTG.
DESIGNATES SHEAR PANEL
AND HOLDOWN TYPE.
O DESIGNATES APPROXIMATE
HOLDOWN LOCATION
Project. Structural Details
Location Pacific Northwest
0 Copyright 1993
I•TERM.
STUDS
SOLE (9)
PLATE
4" O.C. 4" O.G. 16de 8 oc 16d TOENAILS
AT 8 O.C.
3 I O.C. 1 6" 0,C. 116d, I6d 3 oc
6" O.G.
4" O.C. 12 O.C. STAGRD
3" O.C. 12" O.C. 16de 21/2'!oc
3" O.G.
STAGRD
12" O.C.
12" O.C.
12" O.C.
NOTES
STAGRD
16dg 31/2"oc
STAGRD
16de 2 "oc
STAGRD
16de I1/2"oc
STAGRD
133. RF
Date 1/2007
Job No 7000
BLOCKING/ (9) 5 i 8 '4 x 1"
RIM JOIST EMB. ABs
(3)
"LTP5 "e 48" oc
(3)
"LTP5 24 oc
(3)
"LTP5 "e 15" cc
(3)
"LTPS'e 10" oc
(3)
'LTPS 'm 6 oc
45" O.G.
45 O.0
16" O.C.
10" O.C.
IS O.C.
12" O.0
REFERENCES TO SEE NOTES ABOVE
Sheet No
ALL PANEL EDGES
MUST BE BLOCKED
REMARKS
11/2 LONG x 1/15 WIDE
STAPLES W/ CROWNS
PARALLEL W/ FRAM'G.
DBL. STUDS /BLKG. AT (5)
ADJOINING PANEL EDGES
W /16dAT4 O.0
DBL. STUDS/BLKG. AT (5)
ADJOINING PANEL EDGES
WI 16d AT 4 O.G.
DBL. STUDS/BLKG. (8)(II)
m ADJOIN'G PANEL EDGES
WI 16d AT 4" 4 3X MUDSILL
3X. MUDSILL AND (S)(II)
3X. STUDS/BLKG. AT
ADJOINING PANEL EDGES
PER NEW CODE, ALL ANCHOR BOLTS MUST
HAVE 2 SQUARE X 3/16 HDG PLATE WASHERS
I. ALL FASTENERS USED AT THE COAST AND IN CONTACT .UITH PRESSURE
TREATED MATERIAL MUST BE HOT DIPPED GALVANIZED (I-IDG)
2. "F RI-1. P- NAIL" DESIGNATES A FULL ROUND HEAD PNEUMATIC- DRIVEN
NAIL (10d GALV BOX NAILS MAY SUBSTITUTE FOR 0.1484 P- NAILS)
3. SIMPSON `RBC BOUNDARY CLIPS TO SUBSTITUTE FOR 'LTP5 AT ROOF
4 SHEATHING ON SHEARWALLS MUST EXTEND DOWN TO SOLE 4 MUDSILL
PLATES AND SHALL NOT BE INTERRUPTED BY ANY WALL BUTTING INTO
THE SHEARWALL.
5 PROVIDE DOUBLE STUDS/BLKG. W/ 16d AT 4" O.G. AT ADJOINING PANEL
EDGES TO AVOID SPLITTING, NAIL EACH PANEL EDGE TO ONLY ONE 2X.
6 "SIMPSON" PRODUCTS SHALL BE INSTALLED AS PER MFG. SPECS
1. HOLDOWNS OCCUR AT ENDS OF SHEAR -WALLS AND SHALL FASTEN
TO A MINIMUM OF (2) STUDS (MIN.) LAMINATED TOGETHER W/ I6d AT 6 o.c.
8. USE LONGER FDN, BOLTS WITH 3X MUDSILL AND SET BOLTS HIGHER
DO NOT INSTALL FDN. VENT WITHIN 12 CLR. OF A HOLDOWN ANCHOR BOLT
9. FASTENERS SPACING APPLIES ONLY AT FULL HEIGHT WALL SEGEMENTS
OTHERWISE USE MINIMUM CONSTRUCTION STANDARDS
10 ANCHORS SHALL HAVE MIN 13/4 EDGE DISTANCE 4 5" END DISTANCE.
11. WALLS WITH PLYWOOD ON EACH SIDE SHALL OFFSET PLYWOOD EDGE
JOINTS ON ONE SIDE OF THE SHEARWALL FROM THOSE ON THE OTHER
EXTEND PLYWOOD THROUGH CORNER AS SHOWN IN DETAIL 14 TO
ACHIEVE MINIMUM SHEARWALL WIDTH SHOWN ON PLANS
12. SHEARWALLS WITH OVERDRIVEN NAILS PENETRATING SURFACE BY MORE
THAN I/8" WILL BE REQUIRED TO BE RENAILED USE A RUBBER
GROMMET IN HEAD OF NAIL -GUN AND ADJUST AIR PRESSURE SO NAIL
HEADS ARE FLUSH WITH OR SLIGHTLY RECESSED INTO SHEATHING.
13. ALL STUD WALLS MUST HAVE DOUBLE TOP PLATES W/ I6d AT S O.G.
AND STUDS IS" o.c_ PLATES SHALL LAP A MINIMUM 4 -0' AT SPLICES
WITH AT LEAST EIGHT 1601 NAILS EACH SIDE OF SPLICE
14 HOLDOWN TYPES W/ GREATER NUMERICAL DESIGNATION MAY
SUBSTITUTE FOR l-IOLDOWNS WITH LESSER SEE CHART TO THE LEFT
15 USE 3000 PSI CONCRETE IN STEMWALL. PROVIDE (2) "4 CONT T 4 B
IN STEMWALLS WITH THESE NOLDOWNS EXTEND 10' 0' PAST HOLDOWNS
16 FASTEN TO (4) 2x6 FULL -HGT STUDS FASTEN EACH STUD TOGETHER W/
(2) ROWS I6d AT 6 O.C. STAGGERED EDGE NAIL WALL PLY TO EA. STUD
IN SHADED AREAS FASTEN SHTHG. AT 4" O.C. AT BOUNDARIES OF
SHADED AREA AND PANEL EDGES. BLOCK PANEL EDGES W/ 2"
NOMINAL FLAT BLOCKING. USE 8d COMMON NAILS FOR ROOF.AND
10d AT FLOORS /CLGS. USE 5/8" 05B OR PLY SHTI -4G. AT CEILINGS
1- 12 -0'f
le/e/
'.Architecture Engineering, Inc
2 X STUD WAL'
SIMPSON 'LTP5'
SEE SCHEDULE
FOR SPACING
SHEARWALL
EXTEND WALL
SHTI -IG DOWN
TO TOP WALL
PLATE 4 EN.
EDGE NAIL
SEE NOTE
BELOW
APA- RATED
ROOF SHEATHING
BOUNDARY
NAIL (BN.)
2 X SOLID .J
FRIEZE BD
10d 0 4 OG.
7 1 r)
PLY. SPLICE PT,
EDGE NAILING J
SIMPSON 'LTP5'
RECOMMEND
USING 'DRY'
LUMBER RIM
JOIST OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
ROOF FE IMETE
THIS DETAIL ALWAYS APPLIES.
1 ---2 X BLOCK'G
EA. SIDE m 48'
SIMPSON 'LS30'
MAY SUBSTITUTE
FOR 'LTP5'
JO IST /S EARW,4LL
7 SOLE PLATE
NAILING SEE
SCHDE FOR INFO
(4) IOd EA. !SU
FLOW. J:'?ISTS
----i"
i
10d m 4 0,C.
PLYWOOD
DECK. SHEATHING
JOIST
APA -RATED
SHEATHING
2 X BLOCKING AT
6 -0' 0.0 WI (3)10d
TOENAILS TO PLATE
2 X STUD WALL
APA -RATED
SHEATHING
n PARALLEL JOISTS
THIS DETAIL ALWAYS APPLIES.
Project: Structural Details
Location. Pacific Northwest
Copyright 1993
SIMPSON 'HI' TIE AT
EACH RAFTER ALONG
ENTIRE PERIMETER
NOTE: "H10 -2 MAY
SUBSTITUTE FOR 'HI"
NOTE: &IMP 'H2a' MAY
SUBSTITUTE FOR 'HI' AS
LONG AS 'RBC' CLIPS AT
24 o.c. ARE USED TO
CONNECT THE FRIEZE BD
TO TOP WALL PLATE.
APA -RATED
ROOF SHEATHING
8d m 4 O.C.
2 X 6 FLAT BLK'G
W /I6d +4 O.C.
INTO WALL E
By RF
Date 1/2007
Job No 7000
O
SHEARWALL
PLYWOOD
SHEATHING
10d 4 O.G.
O
END OF
2X WALL
END OF 2x4
4 DRAG STRUT
I
I
2 X SOLID BLKG.
W/ SIMPSON 'L550'
2X BLKG. W/
16d AT 6 O.C.
2 X STUD WALL
Sheet No
RAFTER OR
TRUSS -EN.
FLOOR
SHTH'G.
EN.
2"
I/2 SHTHG W/ 10c1 AT 4 O.C.
EDGES, BLOCK EDGES.
SEE SH'WALL SCHEDULE
FOR ADDITIONAL INFO.
STRUCTURAL CEILING
SOLID BLK'G.
I SIMPSON 'LS50'
1 16d 8'o.c. MAY SUBSTITUTE
FOR 'LTP5'
71
SOLID BLK'G.'
SIMPSON 'LTP5' J I JOIST
SEE SCHEDULE
FOR SPACING
SHEARUTALL
APA -RATED
SHEATHING
JO IST /Sa- 1EARUJ,4LL
I0d m 6 O.C. AT FLOOR
AT DSCR, PROVIDE 2x4
x 5' -0' LONG NAILED TO
BOTTOM CHORD W/ I6d AT
4 O.C. STAGGERRED
PREDRILL HOLES FOR
CONNECTOR SCREWS
DfiRAC STRUT
SOLID BLKG
EA. SIDE 5' -0'
AWAY FROM END
OF DRAG STRUT
1
CONNECTOR SEE PLAN
FOR SIZE. INSTALL WI
EQUAL LENGTH TO DRAG
STRUT AND WALL.
T,FTG.
Project Structural Details By RI:
Location Pacific Northwest Date 1/2007
Architecture Engineering. Inc Copyright 1993 Job No 7000
SOLE PLATE
NAILING SEE
SCHEDULE
FLOOR
RAMING I 1 1
I
•4 CONT HORIZ II'
AT TOP 4 BOTTG11 II
it
ii' i
CONC. STEM WAL
EDGE NAIL SIDE WALL
51-171-4.p TO 4x6 STUD
(12) 16d�
n
CO
TiFON WALL
B OND
PROV DE 18"
AT EN OF
WALL INF
NORMAL JOIST
THIS DETAIL ALWAYS APPLIES.
I MIN. PLY WIDTH I l
EA. SIDE I' 10'"
r SIMP30N 'PHD6
II 4x6: PLATES W/ (2) 5/8 "4X12'
II J -BOLTS AT 5' o.c. WI
51MP T;P WASHERS
,r (2) R,r_'WS OF NAILS AT 1172"
r`f..∎= ,GERED TO MUDSILL
I• SIMPSON "LTP4 EA. END"
II'
II
I I
U
4' —o
I Th -2
I_ 1
4PA RATED
SUE4TI -ZING FASTENED
TO MUDSILL PLATE
GARAGE -FRAME DETAIL
EDGE NAIL (EN)
SIMPSON 'LS50" ANCHOR
(NOT REQ'D IF SHTH'G
EXTENDS CONT TO MUDSILL
W /OUT ANY JOINTS)
EDGE NAIL (EN)
ex x 1" EMS, AB's
W/2 X2 X3 /16
PLATE WASHERS OR
SIMP "SP 5/8 -2"
•4 DOWELS 48 O.C.
(MINIMUM)
NOTE
EXTEND GARAGE
DOOR HEADER
SIMPSON "MSTC28' OVER ENDWALL.
EA. SIDE (4- TOTAL) HEADER WIDTH TO
MATCH WALL WIDTH
NAIL SHEATHING TO
HEADER WI 0.148 "0 x
2'4 F RH. P -NAILS
3 O.G. BOTi I WAYS
4x6 STUD EA. END
WI ADD'L 2X NAILER
CORNER W/ I6d 6
CARACCE
V APA -RATED SHTH'G
FROM A SINGLE SHEET
BOTH SIDES W/ 0.148 "0
F RI-I. P -NAILS INTO
4x6 W/ (2) ROWS AT 2" oc.
EXTEND PLYWD THRU
CORNER SEE DET 14
6X SOLID BLOCKING
AT SHEATHING SPLICE
•11 "A HAIRPIN BAR x1
1L 8" CONCRETE WALL W/
I I (2)'4 DOWELS EA. END
U UNDER 54-IEARWALL
121.4X i -b50
2 -3 n
12" S CONT. FIG.
W/ (2)•4T IB
24 "x Air X12" FTG.
W/ (3) •4 CENTERED
BELOW RAISED STEMWALL
(4) I0d w 3
PLYWOOD
DECK SHEATHING
c"r-
N
IF FLOOR JOIST
SYSTEM, PROVIDE
2 X BLOCKING
12 O.G. W/ (3)
lOd TOENAILS
TO PLATE
CONC. STEM WALL
PARALLEL JO ISTS
THIS DETAIL ALWAYS APPLIES.
I.
PONYWALLS 4 -0" AND TALLER MUST SE
APPROVE BY ENGINEER. OTHERWISE OK
1
.1
I
J
"4 CONT HORIZ T' I B
Yp "0 x 1" EMS. AB's
W/2 X 3/16
PLATE WASHERS OR
ll
SIMP 'BP 5/8 -2
11 I •4 DOWELS 48 O.G.
�•4 CONT T
(MINIMUM)
I
'if• tl
COI`IRETE FOUNDATION 114
—APA RATED
SHEATHING.
SOLE PLATE
NAILING
EDGE NAIL (EN)
SIMPSON "LS50" AT
SAME SPACING AS 'LTPS
EDGE NAIL (EN)
MIN. (2) 2X6 STUDS AT
HOLDOILNS EDGE
NAIL PLY TO STUDS
PROVIDE SOLID WOOD
HOLDOWN STUDS
436 '.HREADED
ROD WITH SAME
DI rER AS
ANC C'R BOLT
II p II++-- 'Sit'ff?SON "Si
11 N
II 1111
II Iw•
ft.
'll
SIMPSON 'CNW' COUPLER
Sheet No
SIMPSON
HOLDOILN
I I
"4 DOWELS 48" O.C.
HOLDOWN e FDON`r'WALL
BOLT
Architecture Engineering. Inc.
f•OLE PLATE
WALL NAILING
SHEATHING BOUNDARY
NAIL
r 80LID BLIG'G.
EDGE NAIL
SHEATHING
L SIMPSON 'LSSO'
RIM JOIST j I MAY SUBSTITUTE
JOIST FOR 'LTPS'
EDGE NAIL
PLY TO
HOLDOU.N
STUDS
r
RUN PLY.
CONT TO
BOTTOM FE
(2) -2 X 6
ELOCK'G
IF BEAM IS
UPTURNED USE
2x6 LEDGER
W /I6dAT6'
STAGG'RD
SIMPSON 'LIPS' I
SEE SCHEDULE
FOR SPACING
2 X STUD WALL
APA -RATED
WALL SHEATHING
1_,
I
CA•TILEVER JST
LAM. STUDS
TOGETHER W/
I6d A7 6 O.C.
SEE PLAN IF PLYWOOD
J
SEE DET �2 CEILING IS REQUIRED
IF BM EXTENDS
BELOW CEILING FASTEN RAFTER TO WALL
PLATE WI SIMPSON 'HI"
SEE DET I FOR ADD'L INFO.
Project: Structural Details
Location. Pacific Northwest
Q Copyright 1993
<J T 1 1 I N TAi6) THREADED' ROCZ 11
al p II• II II WI. SIpIPS'N. 'SET'S ADHESIVE. ,1111:
4-11-11 (SPECIAL.INSPECTION 44
11 REQUIf2E'D -BY CO[}E)
11
-11'
Il CONCR E KOUNDATION'
13 MISSING HOLDOUJN ANC --FOR
BOUND NAIL ROOF PLYWD TO
2 X 10 LEDGER W/ BEVELED
TOP TO MATCH ROOF SLOPE.
NAIL LEDGER W/ (2) -16d EA
WALL STUD 4 EA 2 X 6 ELK'G.
(USE 2x 8 BL1GG. IF TRUSS ROOF)
FOR THIS SECTION OF ROOF,
BLOCK PANEL EDGES W/ 2 X 4
FLAT NAIL 8d 4' 0.0. EDGES
AND BOUNDARIES, 12' O.C. IN FIELD.
SHEARWAL: PLYWD. MUST EXTEND
DOWN TO BOTTOM WALL PLATE
(TYP)
BN.
ANCHOR I EMBED
DIAMETER DEPTH
5/8' I 10'
3/4" I II"
1/8" I 13"
HOEDOWN
GRADE A36"
THREADED ROD
SEE SIMPSON
CATOLOG FOR
DIAMETER
ROOF LEDGER DETAIL
APA -RATED
WALL
SHEATHING
(2) -2x OR
dx (REF.TO
PLANS)
HOLDOWN
STRAP WRAP
AROUND DBL.
JOISTS
SIMPSON
'HMO'
EA SIDE OF
DBL. JOISTS
(PROVIDE WEB
STIFFENDER IF
I -JOIST USED)
8d AT 6' o.c.
AT ALL FRAMING
MEMBERS WITHIN
5' -0' OF EDGE
EITHER NO
JOINT IN PLYWOOD
OR
FASTEN S1-'WALL TO
ENDWALL TRUSS WI
BLOCKING/RIM
FASTENERS SHOWN
IN SI- I'WALL SCHD'L.
SH'WALL SEE
SH'WALL SCHEDULE
FOR NAIL'G REOMTS.
By RF
Date 1/2007
Job No 7000
CONT RIM 4
2X BLKG. OR
B RIM JST
(12) I0d
EA. END
OF STRAP
SOLE PLATE
NAIL ING
BOUNDARY
NAIL
r -SOL BLK'G.
NOLDOUJN TO RIM JST
16d AT 6 O.C.
IF THIS IS A SH'WALL
W/ A HOEDOWN,
THEN EXTEND SHTH'G
THRU 4 EDGE NAIL
NOTE.
THIS DETAIL IS REQ'D
ONLY WHEN TWO
SHEARWALLS SHARE
ONE HOLDOUNN.
FRAMING AT CORNER
SHTHG.
GABLE END TRUSS
NAILS BASED
ON SI-EARWALL i I_
REOMTS. BELOW
2x4 FLAT AT 24 OZ.
IN END -WALL TRUSS
2X VERTICAL BRACE
(2) 10d AT 8" 00.
2x4 BLKG. AT 6 -0' O.G.
WI Sd AT 3" OC.
TRUSS BOTTOM CHORD OR CEILING JOIST
(2) 16d EA. TRUSS
2x4 x 8' -0' LATERAL
BRACE AT 6 -0' o.c.
(6) 16d NAIL
Sheet No
5
SIMPSON 'L550'
MAY SUBSTITUTE
JOIST FOR 'LTPS'
DBL. JOIST AT
EACH END OF WALL
OVER DBL. STUDS
FASTEN TO RIM JOIST
W/ SIMPSON 'LSO'
4x6 OR
(2) 2X STUDS
HOLDOUN
16 AT 6' O.C.
INTO EA. STUD
EDGE NAIL
NOLDOIIN
IF 'H' EXCEEDS 6 -0' THEN INSTALL
2x4 ON EDGE BEHIND 2x4 FLAT IN
END -WALL TRUSS. IF 'H" EXCEEDS
12' -0' USE 2x6 ON EDGE. SEE ABOVE.
DBL.2xSOLID BLOCK
W/ (2) SIMP 'LS50'
TO WALL PLATE
2x6 PLATE W/ led
AT 12" o.c. TO WALL
GYPSUM BOARD
DIAPHRAGM WITH
541 COOLER NAILS
AT 1' 00. AT FIRST
(4) CEILING MEMBERS
AND 2x6 PLATE
GABLED ENDUJALL
r
Architecture Engineering, Inc.
SHEARWALL2 fi r- (2) -2x OR 4x
(REF TO PLANS)
1
I'
2x SOLE 12 1,
SEE SCHDL .I
FOR INFO
11
CUT 'ii x 4'
SLOT IN SHTHG.
2x SOLID BLK'G EACH
SIDE NEXT TO STRAP
7 ROOF
TRU55
j0 L
002'41-
1 9.r
ourl 1 SIp
INTERFLOOR -IOLDOUJN
HOLDOU.N STRAP
(INSTALL STRAP W/
EQUAL LENGTH TO
BEAM 4 STUDS.
DBL. JOIST
OR BEAM
(12)10d EACH
END OF STRAP
I- IOLDOWN DETAIL
I 1
Project. Structural Details
Location Pacific Northwest
cU Copyright 1993
UNLESS OTHERWISE
SPECIFIED,USE (2)
SIMPSON 4HT530"
EA. END CF BEAM
BOUNDARY
NAIL
SOLID BLK'G.
SIMPSON 'LIPS"
SEE SCHEDULE
I i FOR SPACING
I
SOLID U$OOD
BELOW BEAM
EN. SHTHG. TO
F– STUD W/ STRAP
EDGE NAILING (2) 16d INTO TRUSS T413 CHORDS
2x4 AROUND SLKG.
PANEL ''ERIMETER
3" DIA VENT
HOLES AT 10' O.C.
PER IBC 12032
2x4 FLAT EDGE FRAMING
NAILED TO TRUSS VERTICAL
W/ 16d AT 6' O.C.
1
i WALL TOP PLATES
I i
1/2 PLY SNTH'G. WI
10d AT 4 O.C, EDGES
16d AT 5' O.C. FROM BLKG.
PANEL TO WALL PLATES
2X50LE1W
SEE SCHEDULE
FOR INFO
APA -RATED
ROOF SHEATHING
BOUNDARY
NAIL (SN.)
2 X SOLID
FRIEZE BD.
4_
By RF
Date 1/2007
Job No 7000
(2) -2x OR 4x
(SEE PLAN)
L 2 X SOLID SLK'G
BELOW ENTIRE LENGTH
OF SHEARWALL.
NOLDOLJN DETAIL
I- IOLDOWN STRAP
(INSTALL WITH
EQUAL LENGTH
TO BEAM AND
STUDS.
2 X STUD WALL
SHEARUJALL NAILING
SAME AS BELOW
SOLID BLK'G.
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS'
CLG. JST
APA -RATED
SHEATHING
SI•- IEARLIJALL EXTENSION
FOR STICK FRAMED ROOFS
NAIL Sd AT 3 OC. INTO
EACH 51-IEAR TRUSS FOR
DIAPHRAGM LOAD UP TO
200 PLF OTHERWISE USE 3" O.C.
UNLESS SPECIFIED OTHERWISE,
EITHER SHEAR TRANSFER
SYSTEM MAY BE USED
SHEAR TRUSSES
EACH DESIGNED FOR
DIAPHRAGM SHEAR LOAD
SI4OUN ON PLANS
(TRUSS TO TRANSFER SHEAR
FROM TOP TO BOTTOM CHORD)
(4) 16d NAILS
2x5 AT 16 O.C.
W/ (3) I6d EA. END
Sheet No
3
FASTEN TRUSS TO WALL
W/ 'L550' CLIPS
SEE SCHEDULE FOR SPACING.r! c�
SHEARWALL
SHEAR TRUSS MAY BE ELIMINATED IF
SHEARWALL EXTENDS UP TO ROOF
SHEATHING. SEE DET '20 FOR INFO
SI-IEAT WALL EXTENSION Si- LE ARWALL EXTENSION
FOR TRUSS- FRAMED ROOFS
Architecture Engineering, Inc
THIS DETAIL ALWAYS APPLIES,
BOLT DECK LEDGER
TO RIM JOIST W/ ai "0
AT 16" O.C. AND (2) ROWS
I6d AT 8" Ore.
(USE 2 -5/8" BOLTS IF
JOIST SPAN GREATER
THAN
FLOOR JOIST 1
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
BEAM
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
I :I
STRAP SEE
FLOOR PLAN
4 X B POST
APA -RATED
SHE ATHING
THIS DETAIL ALWAYS APPLIES.
I I
II
I I
I
Project. Structural Details
Location. Pacific Northwest
Q Copyright 1993
HOLDOU,N W/ A36
GRADE THREADED ROD
TREADED ROD
SIMPSON '1MSTC"
WRAP STRAP AROUND
HEADER IF NECESSARY
FILL CAVITY W/ SOLID
WOOD AT HOLDOU.NS
1 1 1 -DRILL HOLE I/8" GREATER IN DIA
IN CENTER OF BEAM FOR BOLT
I I
I. II
5" SQ X 3/8" !MG PLATE
PEEN THREADS AFTER TIGHTENED
SIMP. "MSTC40" I
EA. END OF HEADER
FASTEN TO
DBL. STUDS
NOLDOLUN ABOVE BEAM
EXTERIOR WALL
�I In D II II
2X STUD WALL BEAM
I 2X6 DIA. BRACE
W/ (2) I6d EA. JOIST
ST6224 STRAP WRAP
AROUND BACK OF LEDGER
4 NAIL TO DIAG. BRACE
DECK LEDGER HANDRAIL CONN_
MULTIPULE (6) I6d 2 NAILS AT THE TOP
HOLDOWN STUDS MIDDLE, 4 BOTTOM
SEE SCHEDULE
CUT 1' X 4" SLOT IN PLY.
FLOOR SHTHG FOR STRAP
SIMPSON "H2.5
EA. SIDE 4 X 12 BEAM
N
NOTCH 4X8 FOR 3"
BEAM BEARING
SIMPSON "PHD2" W/
5/8" X 8- EXP BOLT
CONCRETE FTG.
SHE ARUJALL- POST CONN_
1
SIMPSON ABU"
POST BASE
OR ELEVATED
"EPB' IF SLAB
OR USE BASE
COIN. SHOWN IN
DETAIL 30
I 1 I CONC. FIG.
PORCI -1 /DECK POST CONN.
L J
2X SPACED CEDAR 7
DBL. 2X MEMBER OR
4X MEMBER RIM JOIST.
'4" X 3' X 6" X 0' 9"
STEEL ANGLE
DOUBLE 2X
JOIST
4 1 12' 4
5/8 "0 THROUGH BOLTS WI NUTS
AND I DIA X 3/16" WASHERS.
EA. SIDE. 4X6 CEDAR NEWELL
TO RIM JOIST.
PERPENDICULAR WALL
CONNECT WALLS TOGETHER BY FIRS
(9) I6d THEN INSTALL ADDITIONAL
2x4 AGANST IT AND NAIL W/ (6) I6d
PLYWOOD SHEATHING
OVER WALL STUDS
By RF
Date 1/2007
Job No 7000
a
p
EDGE NAIL (EN.)
TO END 2x4
(6) I6d
BEAM
UNLESS NOTED OTHERWISE,
USE SIMPSON' PC'
POST CAP
(USE "EPC" AT
ENDS OF BEAM)
PRESSURE- TREATED
WOOD POST
CONCRETE SLAB
Sheet No
EDGE
NAIL
0 0 1 SNEAzUJALL- EXT WALL CONN_
THIS DETAIL ALWAYS APPLIES,
All kit/
Architecture Engineering, Inc
NAIL SHTHG TO
GIRDER TRUSS W/
8d AT 6 O.C.
BOUNDARY
NAIL (BA.)
2 X SOLID
FRIEZE BD
NAIL WALL SHTNG.
TO EA. HOLDOWN
STUD W/ I0d 0 6
FOR 2 -STORY
CONDITION, USE
'MSTC28' STRAP
DIRECTLY BELOW
GIRDER TRUSS
TIEDOWN ABOVE
RECOMMEND
USING 'DRY'
LUMBER RIM
JOIST OR 'LSL
KIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
NAIL (16)12d
EACH END
TO STUDS ONLY
SEE DETAIL '11
TRUSS BOTTOM
CHORD OR
CEILING JOISTS
/r
CONNECTOR SEE PLAN
FOR SIZE. INSTALL W/
EQUAL LENGTH TO WALL
a
AND BLOCKING.
(2) BAYS OF
4X SOLID BLKG
W/ (2) I6d EA. END
r
Project. Structural Details
Location Pacific Northwest
Q Copyright 1993
SIMPSON 'LGT' TIEDOWN
AT EA. GIRDER TRUSS
NOTE.
THIS DETAIL NOT REQ'D
IF TRUSS MFG. CALLS SHOW
LESS THAN 1000" NET
UPLIFT FORCE AT GIRDER
TRUSS REACTION. IF SO,
THEN USE (2) 'H2ST' TIES
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
(4) 10d EA. BLK
FLOOR JOISTS
2 X BLOCKING AT
6 -0' 0.0 WI (3) IOd
TOENAILS TO PLATE
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
NAIL WALL SHTHG.
TO EA. STUD WI
10d AT 6 OC.
28 GIRDER -TRUSS CONN
THIS DETAIL ALWAYS APPLIES.
1
RE -ENTRANT
CORNER
FASTEN CLG. TO
BLKG. W/ DRYWALL
SCREWS AT 4 O.C.
3� WALL -TO -CE IL'L."'F CONN
APA -RATED SHTI -IG.
FILLER ON SIDE OF BM.
EDGE NAIL (EN.)
NAIL FULL -HGT STUD
TO BEAM W/ (2) ROWS
16d AT 3 O.C. STAG'RD
EDGE NAIL (EN.)
FULL -HGT
WALL
PANEL
WALL TOP
PLATES
2 X STUDS WI
I6d AT 8' O.C.
STAGGERED
SUPPORT POST
TO BEAR ON FELT
By RF
Date 1/2007
Job No 7000
-T-
NAIL WALL SHTHG
TO F.H. STUDS W/
10d AT 6 O.G.
30" FELT MOISTURE
BARRIER OVER
5000 PSI NON SHRINK
GROUT (THK. mudeIII)
CONCRETE FOUNDATION
E3M -TO -WALL CONN,
EXTERIOR VIEW
POST- TO -FDN CONN
PERFORATED/ WALL DESIGNATION
L 3
EDGE
NAIL (EN.) 11
I I
WHEN PANEL IS jj
24 29' WIDE, 11
PROVIDE 'LTP5'
EACH END
AT BASE
1
EDGE NAIL
AROUND
OPENING
THIS DETAIL ALWAYS APPLIES.
Sheet No
TIE WALLTOP
PLATES TOGETHER
W/ MSTC40 STRAP
STOP (¢IM JOIST
EA. SIDE OF BM
FASTEN TO F.H.
STUD W/ (2) 10d TN.
FULL -HGT STUD EA.
SIDE OF BEAM
BEAM TO BEAR ON
ON FULL AREA OF
2X STUDS LAMINATED
W/ I6d AT 12' O.G.
NOTE:
(4) 2x6 LAM. WI I6d AT 8" O.C.
EQUALS A 6x6 SUPPORT POST
HOLDOWN EA. SIDE
USE 'HDSA UNLESS
NOTED OTHERWISE
PT MUDSILL
STOP AT GROUT
5/8'0 EXP BOLT WI
4 1/2 MIN. EMBED
PANEL
WIDTH
-EDGE
NAIL (EN.)
RIM JOIST
SEE SCH'DL
FOR 'LTP5
SPACING
1 PERFORATED WALL NAILING
r Architecure Engineering, Inc
"N" (4 -0' MAXJ
TI WALL
SEE PLAN I-_ -_4-
r
BEAM
t
TI WALL
ItJSEE PLAN
ry T/ FOOTING
IL SEE PLAN
TI FOOTING
FACTORY GLUED
BRA. BLOCK
COLUMN CAP
SEE PLAN FOR TYPE
"I-I' 2
MN.
Q FOUNDATION STEP
THIS DETAIL ALWAYS APPLIES.
HD ANCHOR! EMBED
D IAMETER DEPTH
S /8" I 10"
3/4" I II"
I 13"
(3) •4 CONT.
T4B
ADD'L BARS IF
SPECIFIED ON PLANS
4 -0`
MIN
I
MIN.
THIS DETAIL ALWAYS APPLIES.
18' UN.O.
Project Shearwall Schedule
Location Pacific Northwest
Copyright 1993
35 SHEARWALL AT SLAB
HOLES MUST BE SPACED
AT LEAST IS" APART
STEMWALL
FOOTING
UNDISTURBED
EARTH
MATCH FOOTING
REINFORCING
AND TIES
2' -0"
APA RATED
SHEATHING.
5/8 "4. A188 OR
5/8 "4 EXP BOLTS
(5' MN. EMBEDMT)
AT HOLDOLNS, USE
(A36) THREADED ROD
WI SIMPSON 'SET' ADHESIVE.
(SPECIAL INSPECTION
REQUIRED BY CODE)
Q
.c
FOOTING DEPTH (HD
EMBEDMENT DEPTH 4
USE 14 (MIN) DEPTH
ACCEPTABLE AREA TO DRILL
MAX 2 3/4' DIAMETER HOLE.
HOLES MUST BE AT LEAST
3` -O" FROM SUPPORTS 4 MIDSPAN
3' -o• AND. IN THE MIDDLE THIRD
OF THE BEAM DEPTH.
G LULAM -BEAM PENETRATIONS
THIS DETAIL ALWAYS APPLIES.
2X6 FLAT W/
16d EA TRUSS
8d 6 O,C.
OVERFRAMIN3
TRUSSES OR
2X FRN-IIN
EXTEND ROCS
SHTHG DOUN
TO BLKG.
PREFAB TRUSSES
OR 2X FRAMING
0 4
3' -0'
ROOF OVERFRAM ING
—APA -RATED
FLOOR SHEATHING
i T -t t O O i\
THIS DETAIL ALWAYS APPLIES.
4 -BAYS OF 4X BLKG.
BUTTERFLY DRAG STRUT
0
m
0
IF SHEARWALL
FALLS DIRECTLY I
BELOW A RAFTER
THEN USE DET. 4 3
2X BLKG. AT 32" OC.
w/ (2) 16d EA.. END
EA. SIDE OF SH'WALL
CEILING JOIST
v
By PS
Date. 1/2007
Job No 7000
IF RAFTER IS LESS
THAN 12" FROM
3HEARUALL, THEN
BLOCK (2) BAYS
STUD WALL
Sheet No
ROOF 6HTG
BN.
APA -RATED
SHEATHING W/
ed 6 EDGES
1 12" FIELD
16d EA TRU5$
2X SOLID ELKG.
2X STUD WALL
I0d 4" OZ.
SIMPSON "PHDS" HOLDOU.N EA
END W/ 5/8 D1A (A36) THRD ROD
RECOMMEND BUILDING SHEARWALL 3/16 SHORT
TO ALLOW FOR VERTICAL SHRINKAGE OF RAFTER
8d AT 3" 00.
r 8d AT b' OC
ROOF SHTHG.
RAFTERS
SHEARWALL
TO MATCH
BELOW
NAIL BLKG.
TO STUD
SHEARWALL
SHEARWALL EXTENSION