HomeMy WebLinkAbout1502 Bldg G E Lauridsen Blvd - BuildingCITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY ECONOMIC DEVELOPMENT BUILDING DIVISION
321 EAST 5TH STREET PORT ANGELES WA 98362
Application Number 09 00000705 Date 7/16/09
Application pin number 770550
Property Address 1502 BLDG G E LAURIDSEN BLVD BSNSS
ASSESSOR PARCEL NUMBER 06 30 14 1 2 0000 0000
Tenant nbr name PENINSULA COLLEGE
Application type description DEMOLITION
Subdivision Name
Property Use
Property Zoning PUBLIC BUILDINGS PARKS
Application valuation 0
Application desc
DEMO 10 605 SQ FT BLDG G
Owner Contractor
WA GENERAL ADMINISTRATION PRIMO CONSTRUCTION INC
PO BOX 41000 PO BOX 296
OLYMPIA WA 985041000 CARLSBORG WA 98324
(360) 683 5447
Structure Information 000 000 DEMO BLDG G
Permit DEMOLITION
Additional desc DEMO BLDG G
Permit pin number 150201
Permit Fee 50 00 Plan Check Fee 00
Issue Date 7/16/09 Valuation 0
Expiration Date 1/12/10
Qty Unit Charge Per
BASE FEE
Special Notes and Comments
July 15 2009 3 31 19 PM 1pangrle
This permit is strictly for building demolition only
Public Works Engineering issues must be addressed prior to
any earth disturbing activity prior to issuance of the
clearing and grading permit
July 16 2009 11 33 54 AM sroberds
The permit is for building demo only No site work is
approved at this time Site work permit approval remains
pending stormwater issues
Excavation beyond the founation footprint is not allowed
Other Fees
Fee summary
Charged Paid Credited
Permit Fee Total 50 00 50 00 00 00 h
Plan Check Total 00 00 00 00 1 7q
Other Fee Total 4 50 4 50 00 00
Grand Total 54 50 54 50 00 00
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes null and
void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned for a period of 180 days
after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection I hereby certify that I have
read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will
be complied with whether specified herein or not. The granting o permit does not pj-esume to give authority to violate or cancel the provisions of any
state or local law regulating construction or the ,performance o onstruction•
1 73()
STATE SURCHARGE 4 50
Due
Extension
50 00
Date Print Name Signature oflContractor tyr Authorized Agent
T:FormsBuilding Division/Building Permit
Signature of Owner (if owner is builder)
FOUNDATION
Footings
Stemwall
Foundation Drainage Downspouts
Piers
Post Holes (Pole Bldgs.)
PLUMBING
Under Floor Slab
Rough -In
Water Line (Meter to Bldg)
Gas Line
Back Flow Water
AIR SEAL.
Walls
Ceiling
FRAMING
Joists Girders Under Floor
Shear Wall Hold Downs
Walls Roof Ceiling
Drywall (Interior Braced Panel Only)
T -Bar
INSULATION
Slab
Wall Floor Ceiling
MECHANICAL.
Heat Pump Fumace FAU Ducts
Rough -In
Gas Line
Wood Stove Pellet Chimney
Commercial Hood Ducts
MANUFACTURED HOMES
Footing Slab
Blocking Hold Downs
Skirting
T:Forms /Building Division /Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24 -HOUR NOTICE FOR INSPECTIONS
Building Inspections 417 -4815 Electrical Inspections 417 -4735
Public Works Utilities 417 -4831 Backflow Prevention Inspections 417 -4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED
POST PERMIT IN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
PLANNING DEPT Separate Permit #s SEPA.
Parking Lighting 1 ESA.
Landscaping 1 SHORELINE.
Inspection Type
Electrical
Construction R.W PW Engineering
Fire
Planning
Building
FINAL Date Accepted by
1 FINAL Date
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/ USE
Date Accepted By
417 -4735
417 -4831
417 -4653
417 -4750 I
417 -4815 /V V
Accepted by
0
o Wvwx- e .e
NMI
Applicant l C�1n 1
Property Owner xt��g, t
Propert ner's Address (_a La r,ci�
Contractor r-mo 0 One
Contractor's Address q-th Q n License
PROJECT ADDRESS
Parcel Number
Proiect Tvne Brief Description.
Check all that apply
New Construction
Addition
Remodel
Repair
X Demolition
Re -roof
Heat System
Other
Floor Areas
Basement
1 Floor
2nd Floor
3 Floor
Garage
Carport
Covered Porch
Deck
Shed
Other
eou *j ��-b W A G A�Z;y r, t su o V1) 6P® BP c
4 9 X5 0
BUILDING PERMIT APPLICATION Print in ink
Max. height of proposed structures
Will a lawn sprinkler system be installed?
Will a fire sprinkler system be installed?
Date 74 1 1.09_ Print'Nam
T Forms /Building Division /Bldg Permit doc
CITY OF PORT ANGELES
Attn Building Permit Technician
321 E Fifth St. Port Angeles WA 98362
(360) 417 -4815 fax (360) 417 -4711
Q
,rl
1
xpires
/5a� l �it vicls
eidc3, Or
Residential Multi family
Lot
For City Use Only
Date Received 7-115 CJrl
Permit
Date Approved
Phone 3(00. t c 2 ).5448
Phone )41-1, -ten
cif-Yen P rxc, c (155-0-
(DO
Phone
V)1 Ir.) p_ q83 2
E -mail
r
11
QIVC.i -PPo
Zoning
Commercial Industrial
House g -rage oth
tear off re -roof lay over one layer
Heat pump wood burning stove gas fireplace pellet stove other
Existing (sq. ft.) Posed (sq. ft.)
Total footprint of structures sq ft. Lot size sq ft. Lot coverage
Site Coverage the amount of impervious surface on a parcel including structures paved driveways sidewalks patios
and other impervious surfaces (see PAMC 17 94 135 for exemptions) Site coverage
ft. Occupancy group
Occupant load
Construction type
per sq ft.
TOTAL VALUATION
of bedrooms
of full baths
of half baths
hawc1 0
Pellm.w
I have read and completed this application and know it to be true and correct. I am authorized to apply for this permit and understand
that it is my responsibility to determine what permits are required, and to obtain permits prior to)vorking on projects
a Disabled Parking
PENINSULA
COLLEGE
y
4k PENINSULA
LamjCOLLEGE
E. LAURIDSEN BLVD
w
CC
1st ST
FRONT ST
T be_ DeJty, is (-red
N
A. Massage Therapy, Distance Leaming, Comaby Center
AN. ITV Complex
B. John D Glenn Library
C. President's Office, Instructional Services, FoundationOffice,
Business Office
D. Student Services Center Enrollment Services, Student
Development/Counseling, Financial Aid, International Programs,
Testing, Career Services, Leaming Center Services for Students
with Disabilities, Veterans' Services, Multicultural Services
F Humanities, Social Sciences
G. Business, Mathematics, Chemistry, Computer Lab
H. Education Transition Centers, Sciences
I. Maier Hall, Lecture Hall
J. Pirate Union Bldg. (PUB), ASC Office, Little Theater Fine Arts,
Bookstore
K. Fisheries
L. Information Technology, Surveying, CISCO Journalism, Nursing
LE. Nursing Extension
LW. Computer Training Center Performance Institute
M. Future Site of the Science and Technology Building
N. Wally Sigmar Athletic Complex
Gymnasium
Ballfield
Tennis Courts
Educare Center
P Art, University Representatives, Early Childhood Education
Q. Automotive, Welding
R. Automotive, Welding Storage
S. WISHA Storage
T Maintenance, Receiving, Motor Pool
U Informator Technology Services
V Computer Classrooms
W Performance Institute
(7/16/2009) Linda Pangrie Demolition Permits For Peninsula College Buildings F G H &I
From Linda Pangrie
To: davidw @pcadmin.ctc.edu
Date: 7/15/2009 3 29 PM
Subject: Demolition Permits For Peninsula College Buildings F, G, H, I
Hi Dave,
Jennifer from Primo Construction, called today and wants to get the demolition permits for the four buildings ASAP She
said they'd like to start demolishing.tomorrow She said she'll submit the demolition permit applications today I told her
we can't give her over- the counter demo permits. Various departments need to give their approvals first;
We also want to make sure t
Please e-mail me back yo
Thanks,
Linda Pangrle
Permit Technician
City of Port Angeles
321 E. 5th St.
Port Angeles, WA 98362
360 417 -4815
360 417 -4711 FAX
Ipangrle @cityofpa.us
approval
b; with you that Primo Construction is acting as the agent to obtain these permits.
r disapproval of our issuing these permits to Primo
b,tv)\ �flzQ-
Page 1