HomeMy WebLinkAbout119 Juniper Ln Technical - BuildingTECHNICAL
Permit O?30
Address 9 ur Lan('
Project description New S t` n q Ie �ti Resc er ce,
J
Date the permit was finaled 01 09
Number of technical pages 53
5 Ca cs
PLAT #3695
FOR
Suntel Home Design
return for payment of a one -time fee, FAE eueitz Architecture Engineering, L.L.C. grants
you a limited license to use the Analysis to construct one single house at the address shown below
This lateral analysis is not to be used for any master plan approval process.
Site Location Lot #13, 119 Juniper Ln. Port Angeles, WA
Copyright: #10117
NOTICE. If the Building Department accepts the Analysis without an engineer"
"wet- stamp" seal signed with red ink or for different site location than shown above, th
agreed that such Building Department accepts total liability out of or in connection with
Analysis.
CALCULATIONS SHEAR SHEET, L -SHEET VALID ONLY WITH
ORIGINAL STAMP HERE AND DIGITAL STAMP ON PLANS
AND
CAN NOT BE USED
AFTER
September 2008
ENGINEERING L.L C
w 143
Phone: (503) 533 -5100 Fax. (503) 646 -3777 E -mail. fae- engmeeringsupport@comcast.net
FEB 25 -2008 09 21A FROM FULLER A E
FAE eFfille/s.
Architecture Engineering, L.L.C.
LIABILITY LIMITATIONS
IIA7ERAII ANAIJYSIS
OWNERSHIP OF DOCUMENTS
5036463777 TO 5036240155 P 5
Project. Waverly By RF Sheet No
File #3695- 100D -D2 WA Date. 2/2008
Client: Suntel Home Design Job No 7342
ANALYZE BULL LNG FOR ONI. Y WIND SEISMIC FORCES
according to the
2006 INTERNATIONAL BUILDING CODE
WIND ANALYSIS FOR EXPOSURE D' 100 MPH (3 -sec Gust)
SEISMIC ANALYSIS FOR CATEGORY D2
FAE e U Architecture Engineering, L.L.0 ("FAE") was retained in a limited capacity for this project.
Design is based upon information provided by the Client, who is solely responsible for accuracy of same. No
responsibility and liability is assumed to FAE for items beyond that shown on these sheets. No construction
observations nor soils investigations performed by FAE.
INDEMNIFICATIONS BY BUILDING DEPARTMENT
Building Department agrees to defend, indemnify and hold harmless FAE from any loss, costs, damage,
expense, including attorney fees upon trial or appeal for liability arising out of or in connection with
FAE's Analysis unless Analysis is used for specific site location shown on cover pane and contains an
orizinal engineer's "wet stamp seal sinned with red -ink (no photocopy allowed).
All documents produced by FAE shall remain the property of FAE and shall not be used unless accompanied
by an original engineer's wet stamp issu !d from FAE
FEB -25 -2008 09 22A FROM FULLER A E.
FAE
Architecture Engineering, 1:.1 C
SPACE ROOF SHTHG FASTENERS AT 6" O.C. AT ALL INTERMEDIATE
FRAMING MEMBERS EACH 811DE CP EACH RIDGE, HIP, AND WITHIN
A 5' -0• WIDE NAILING ZONE AROUND THE ENTIRE PERIMETER OF
THE HOUSE (NAILMG ZONE WIDTH STARTS AT EDGE OF ROOF)
Project. Waverly .By RF Sheet No
File #3695- 10OD -D2 WA. Date 2/2008
Client: Suntel Horne Design Job No 7342 6
E) TEN 614EAFWI4L L.
TC RD ]F eWENT 4Wk1,
5036463777 TO 5036240155 P 6
J
1 1 1 1 1 1 1 1 1 1
r
FASTEN EA TRUSS TO TOP
WALL PLATE W/ SIMP "HI
4 EA STUD TO TOP WALL
W! SIMP "OFT
I
I
1 •y 1 1 I I
i t I 1 1 1 l I• 1 1
,pD°2 °_OCQ P_A'
MSTC40 A. mpg
OP PORCH. FASTEN
REAM TO SOLID
WALL BLOCKING
CI.IMNEY DESIGNED
B1 OTHERS
FEB-25 -2008 09 22A FROM FULLER A E
FAE �t�t4t/
Architecture Engineering, 1 1 C
EMEND WEANING
OUT TO PERIMETER
WALLS DELOW
II II
0 II
II llI
II II
5036463777 TO 503E240155 P 7
Project Waverly By RF Sheet No
File #3695- 100D -D2 WA Date 2/2008
Client. Suntel Home Design Job No 7342 1
(OPEN
.a..1 TO AE8ONE)
u
1
r`
BEE DETAIL '9
1L-.�
ERTE1.117READERZIGEI� EIDWAL_L6
R
0
1 r riZa EM
1 n
r\74 _QQ T��
3 MIN.)
WIDTH
bxb w/ ECC46
SEE DETAIL ►26
`4.
6EE DETAIL •25
FEB-25-2008 89 22A FROM FULLER A E 5836463777 TO 5036240155 P 8
FAE egale/te
Architecture EngineetIng, L.1. C
03
I
LJ
L_
1_
L
F r1FTAtt
Project: Waverly
File 13695-100D-D2 WA
Client: &Intel Horne Design
1 1 g
4>
it ALAS L
ti
W<MJC*IL
7retaJliiktr
L
I I
1 I
L I
I
I
I
J
By FT Sheet No
Date 2/2008
Job No 7342
FEB -25 -2008 09 23A FROM FULLER A E
FAE egale/e/
Project: Waverly By RF Sheet No
File #3695- 100D -D2 WA Date 2/2008 `7l
Architecture Engineering, L.L.0 Client: Suntel Home Design Job No 7342
WIND ANALYSIS USING 2006 IBC SIMPLIFIED WIND METHOD
Data.
W Total Wind Force Y x Ix P x A Reference 2006 IBC Figure 1609 6.2.1
Y =161 I• =1
FRONT REAR WALLS
SIDE WALLS
Zone Il:orizontal Pressure
A Pa 17 8 psf
B Pb 12.2 psf
C Pc 14.2 psf
D Pd• =98 psf
W Y I (Pa Aa Pb•Ab Pc Ac Pd Ad)
5036463777 TO 5036240155 P 9
Projected Area
Aa 85
Ab• =0
Ac 420
Ad 0
W= 1.2x10
sq ft.
sq ft.
sq ft.
sq ft.
pounds
Distribute wind force to roof and second -floor level.
FRw1 Y I (0 5 Pa Aa 1 0•Pb•Ab 0.5 Pc Ac 1 0•Pd Ad) FRwI 6 02 x 10 lbs
F2w1 Y I (0 5 Pa Aa 1 0•Pb•Ab 0.5 Pc Ac 1 0 Pd Ad) F2w1 6.02 x 10 lbs
Zone
Horizontal Pressure Projected Area
A Pa 17 8 psf Aa 85 sq ft.
B: Pb 12.2 psf Ab 30 sq ft.
C Pc 14.2 psf Ac 620 sq ft.
D Pd 9 8 psf Ad 260 sq ft.
W Y I (Pa Aa Pb- Ab Pc Ae Pd Ad) W 2.13x 10 pounds
Distribute wind force to roof and second floor level
FRw2 Y I (0.3 Pa Aa 1 0 Pb•Ab 0 3 Pc Ac 1 0•Pd Ad) FRw2 9 67 x 10 lbs
F2w2 Y I (0 7 Pa Aa 0 0•Pb•Ab 0 7 Pc Ac 0 0•Pd Ad) F2w2 1 16 x 10 lbs
FEB -25 -2008 09 23A FROM FULLER A E
FAE eFalle/is
Architecture Engineering, L.L.0
SEISMIC ANALYSIS USING 2006 IBC SIMPLIFIED ANALYSIS PROCEDURE
Data. 1 =1 0 Sd 1.30 R 6 5 r 0 45 (worst case)
E Earthquake Base Shear 1.2 p Qe 1 4 1.2 p (Sd W/ 1 4R)
Weights
Mass Calculations.
Roof Dead Load 15 psf (Composition Roof Covering)
Floor Dead Load 10 psf
Partitions 10 psf
Exterior Walls Windows 10 psf (Average)
Aroof 1500 ft^2
A2ndFloor 1250 ft^2
AlstFloor 1800 ft^2
h2. =21 ft
Mroof 20• Aroof 10• Aroofwall
M2 20•A2ndFloor+ 10•A2wall
p =2—
20
r V A2ndFloor
Distribute Seism: Shears
5036463777 TO 5036240155 P 10
Project. Waverly By RF Sheet No
File #3695- 100D -D2 WA Date. 2/2008
Client: Suntel Horne Design Job No 7342 1 Le,
Aroofwall 700ft ^2
A2wall 1400 ft^2
Alwall 0 ft ^2
hl• =10ft
Mroof 3 7 x 10 pounds
M2 3 9 x 10 pounds
p if(p 1,1,p) p 1
Sd
E L2 p (Mroof M2) E 1.3 x 10 pounds
1 4•R
FRe Mroof E FRe 6 34 x 10 pounds
Mroof M2
M2
F2e Mroof M2 F2e 6 69 x 10 pounds
FEB -25 -2008 09 23A FROM FULLER A E'
if
FAE egielk/e/
Architecture Engineering, L.L.0
5036463777 TO 5036240155 P 11
Project. Waverly
File #3695- 100D -D2 WA
Client: Suntel Home Design
By RF
Date 2/2008
Job No 7342
Sheet No
g�rLe,
INVESTIGATE SHEARWALLS USING PERFORATED SHEARWALL DESIGN APPROACH
Analyze entire brace wall line as a series of perforated shearwall panels using worst case "maximum opening
height ratio Individual perforated shearwall panels extend between plan discontinuity Overturning for such
panel is calculated by rational analysis. Reference Section 2305.3 7.2 2006 IBC
Unadjusted in -plane shear force for brace wall line, FRe 2950#
Percent full height sheathing 8 ft. 16 ft 50%
Maximum opening height ratio 4ft 8 ft 0 50
Shear resistance adjustment factor, Co 0 8 (Ref: Shear resistance adjustment factor table)
Amplified in -plane shear, V Unadiusted shear force for brace wall Line
Shear resistance adjustment factor x Total length of full height walls
FRe (Co x L) 2950# (0 8 x 8 ft) 460 plf
Uplift at perforated shearwall ends calculated based on rational analysis (use only 50% of weight
of first individual full- height wall segment for dead load)
2/3 average weight of full- height wall segments and portion of roof framing, Wd =110 plf
2/3 dead -load reaction at end of shearwall or corner restraint, R1 400#
Uplift at end of perforated shearwalls, Pu Vf x hl Wd x (0 5 Li) R1
460 plf x8ft- 110plf x(05x4ft) R1 3100#
Uplift between wall ends, t V- Wd 460 plf 110 plf 350 plf
Wall bottom plate (1 1/2" thickness) to rim joist.
Use 16d common nails (0 162 by 3 1/2 inches)
Lateral resistance 1.33 x 1414 187# per nail
Withdrawal resistance 33 x 40 ph x 2.5" 133# per nail
Nails for shear transfer 460 plf/ 187# per nail 2.4 nails per foot
Nails for uplift transfer (460 -110 plf) 133# per nail 2.6 nails per foot
Net f shear and up lift 2.4" o c.
Rim joist to wall top plate.
Use 16d common nail (0 162 by 3 1/2 in.) toe nailed to provide shear transfer
Lateral resistance 0 83 x 187# per nail x 1 5 nails per ft. 230 plf (150# per nail default maximur
for seismic loads) plus Simpson "LTP5" framing clip capacity 630#
Net spacing for shear using LTP5 clip and 16d toenails at 8" o c 630# (460- 150 24" o c
Transfer of uplift, t, from second floor in this example is accomplished through attachment of second floor
wall to the continuous rim joist which has been designed to provide sufficient strength to resist the induced
moments and shears Continuity of load path is provided by holdowns at ends of the perforated shear wall.
Use Tyne "C" shearwall w/ HTT22 holdowns. 16d at 2 1/2" o.c. sole plate nailine and LTP5 clans at 24" o.c
FEB -25 -2008 09 23A FROM FULLER A E 503E463777 TO 5038240155 P 12
FAE cFalle/if
Architecture Engineering, L.L.C.
RI 400'
FRe =2950"
OLDOUJN
Pu 3100'
4 -0'
P,S.W. eeciment
WALL HEIGHT
8' -0'
Project. Waverly
File. #3695- 100D -D2 WA
Client: Suntel Home Design
H/3
2' -5'
Pnrrrtralrard ShRAr W811.
1-1/2
214/3
214/6
41-0' 5 -4 I 6 -5'
Percent Full-Height Shaathing I Shear Reeletance 4djuetment Factor
10% 1.0 069
70% 10 0 11
30% 10 014
40% I 1.0 011
509: I IA 0.50
60. I 10 083
10% I 10 051
809; I 1.0 0.91
By RF
Date. 2/2008
Job No 7342
4 -0'
P2.W, Segment
ELEVATION OF PERFORATED SNEARLUALL
MAXIMUM OPENING HEIGHT RATIO AND HEIGHT
8'-0'
0.53 I 0 43 j 036
0.56 0 45 038
059 045 I 0.42
0b3 053 0 45
061 051 0.50
0.11 0.63 056
0.11 069 I 0.63
0.83 011 I 0.11
v
SNEAK' RESISTANCE ADJUSTMENT FACTOR
Sheet No
�((Q
FEB -25 -2008 09 25A FROM FULLER A E
FAE
Architecture Engineering, L.L.C.
INVESTIGATE UPPER FLOOR SHEARWALLS.
Line "A"
Rear Walls
Line "C"
Front Walls:
Project. Waverly By RF Sheet No
File #3695- 100D -D2 WA Date 2/2008
Client. Suntel Home Design Job No 7342 1 l �P
Summation of full- height walls lengths L 33 ft.
Total length of brace wall line TL 48 ft.
full- height sheathing S 100 S 68 75 percent
TL
Diaghragm stress v 0 5 FR v 66 07 plf
TL
Shearwall stress v 0.5
FR
08L
Uplift for shearwall length L1 3 ft.
(worst case)
Pu v8— .5Wd.L1 —R1
Use Tvoe l 'B Shearwall w/ no holdowns
5036463777 TO 5036240155 P 13
Use Tyne "C" Shearwall w/ MSTC52 holdowns
v 120 13 plf
Weight Wd 110 plf
R1 400
Pu 396 04 pounds
Summation of full- height walls lengths L 20 ft.
Total length of brace wall Lane TL 19 ft.
full height sheathing S 100 S 105.26 percent
TL
Diaghragm stress v 0.5 TL v 166 92 plf
Shearwall stress v 1 75 0 5 FRe v 277 5 plf
(Seismic) L
Uplift for shearwall. length LI 2 ft.
(worst case)
Pu =v8 —.5 WdLl —R1
Weight Wd 110 plf
R1 400
Pu 1 71 x 10 pounds
FEB -25 -2008 09 26R FROM FULLER R E
FAE gait/Wet
Architecture Engineering, L.L.C.
INVESTIGATE UPPER FLOOR SHEARWALLS.
Line 1 Walls.
Line 2 Walls:
I roject. Waverly
File #3695- 100D -D2 WA
Client: Suntel Home Design
Summation of full- height walls lengths L 16 ft.
Total length of brace wall line TL 17 ft.
full- height sheathing S TL 100 S 94 12 percent
Diaghragmn stress v 0.2 FR v 113 82 plf
TL
Shearwal stress v 0.2 FR
L
5036463777 TO 5036240155 P 14
Uplift for shearwall length LI 15 ft.
(worst case)
Pu•= v8— .5WdLl —R1
Use Tvne "B" Shearwall w/ no holdowns
Summation of full height walls lengths
Total length of brace wall. line
full height sheathing S L 100
TL
Diaghragm stress v 0.5 TL
Shearwal stress v 0 5 FR
L
Uplift for shearwall length L1 11 ft.
(worst ca. e)
Pu•= v12— .5WdL1 —R1
Use Type 'B" Shearwall w/ MSTC40 holdowns
By RF
Date 2/2008
,lob No 7342
v 120 93 plf
Weight Wd 110 plf
Rl 400
Pu 257.53 pounds
L 24 ft.
TL 27 ft.
S 88 89 percent
v 179 16 plf
Sheet No
t�l 1
v 201.56 plf
Weight Wd 110 plf
Ri 400
Pu 1 41 x 10 pounds
FEB -25 -2008 09 26A FROM FULLER A E�
FAE e�'�
Architecture Engineering, L.L.0
INVESTIGATE UPPER FLOOR SHEARWALLS.,
Line 3 Walls
5036463777 TO 5036240155 P 15
Project: Waverly By RF Sheet No
ile. #3695- 1.00D -D2 WA Date. 2/2008 13/,
Client: Suntel Home Design Job No 7342 J1 Lp
Summation of full- height walls lengths
Total leng 1 of brace wall line
full height sheathing S TL 100
FR
Diaghragr stress v 0.35 TL
Shearwall stress v 0.35 FR
1
Uplift for shearwall length L1 23 ft.
(worst case)
Pu v 8 5 Wd L1– R1
Use Tyne "B" Shearwall w/ no holdowns
L 24 ft.
TL 24 ft.
S 100 percent
v 141 09 plf
v 141 09 plf
Weight Wd 110 plf
R1 400
Pu 536.29 pounds
FEB -25 -2008 09 26A FROM FULLER A.& E 5036463777 TO 5036240155 P 16
FAE ega&ef
Architecture Engineering, L.L.0
INVESTIGATE LOWER FLOOR SHEARWALLS.
Rear Walls
Line A
Front Walls.
Line 13
project. Waverly
File, #3695- 100D -D2 WA
Client. Suntel Horne .Design
Summation of full- height walls lengths L 18 ft.
Total length of brace wall Tine TL 35 ft.
full height sheathing S 100 S 51 43 percent
TL
F2w1
Diaghragm stress v 0.3 v 51.59 pif
TL
0 5 FRw1 0 5 F2w1
Rim/blocking stress v TL v 171.97 pif
Seismic Shearwall v 1 75 (0.5 FRe 0 5 F2e) v 633.33 pif
stress w/ wall aspect L
ratio penalty
0 5 FRe 0 5 F2e
Shearwall stress v v 361 9 pif
L
Uplift for shearwall length L1 2 ft.
(worst case)
Pu•= v9-- .5WdLI —R1
Tvne "C' Shearwall AND Tvne "D" Shearwall at narrow -width walls w/ HTT22 holdowi
Summation of :full height walls lengths L 14 ft.
Total length of brace wall line TL 45 ft.
full- height sheathing S 100 S 31 11 percent
TL
F2w1
Diaghragm stress v 0.3 TL v 40 13 pif
05 FRe 0 5 F2e
Rim /blocking stress v
TL
Seismic Shearwall 1 75 (0.5 FRe 0 5 F2e)
stress w/ wall aspect v
ratio penalty
Shearwall stress
0 5 FRe 0.5 F2e
v
L
Uplift for shearwall length L1 2 ft.
(worst case)
Pu =v9— 5 WdL1 —R1
By RF
Date 2/2008
Job No 7342
Weight Wd 110 pif
R1 400
Pu 2 75 x 10 pounds
v 144 76 pif.
v 814.29 pif
v 465.31 pif
Weight Wd 110 pif
R1 400
Pu 3 68 x 10 pounds
Use Tvne "E" Shearwall w/ PHD6 holdowns AND Garaue Frame Detail
Sheet No
l 4��0
FEB -25 -2008 09 26R FROM FULLER R E
FAE �a
Architecture Engineering, L.L.0
INVESTIGATE LOWER FLOOR SHEARWALLS.
Line 1
Line 2
Project Waverly
File. #3695- 100D -D2 WA
Client: Suntel Home Design
Summation of full- height walls lengths L 26 ft.
Total length of brace wall line TL 25 ft.
full- height sheathing S L 100 S 104 percent
TL
Diaghragm stress v 0.25 F2w2 v 116.27 plf
TL
Rim/blocking stress v 0.2 FRw2 0.25 F2w2 v 193 67 plf
TL
0.2 FRw2 0.25 F2w2
Shearwall stress v L v 186.22 plf
Weight Wd 110 plf
Uplift for shearwall length L1 25 ft.
(worst case) Rl 400
Pu v 9 5 Wd•L1 RI Pu --99 01 pounds
Tvne "B" Shearwalls w/ no holdowns
Summation of full- height walls lengths L 25 ft.
Total length of brace wall line TL 19 ft.
full height sheathing S L 100 S 131 58 percent
TL
F2w2
Diaghragm stress v 0.25 v 152.99 plf
TL,
05 FRw2 +sj.5 F2w2
TL
Shearwall stress v 0.5 FRw2 0 5 F2w2
L
Rim/blocking stress v
Uplift for shearwall length L1 8
(worst case)
Pu v 9 5 Wd•L1— R1
5036463777 TO 5036240155 P 17
Type "C" Shearwalls w/ HTT22 holdowns
ft.
By RF
Date 2/2008
Job No 7342
Sheet No.
v 560 58 plf
v 426 04 plf
Weight Wd 110 plf
R1 400
Pu 2.99 x 10 pounds
FEB -25 -2008 09 26A FROM FULLER A E
FAE vsale/s, Project: Waverly By RF Sheet No
File #3695 100D -D2 -WA Date. 2/2008
Architecture Engineering, L L:C Client: Suntel Home Design Job No 7342
Line 3
INVESTIGATE LOWER FLOOR SHEARWALLS.
Summation of full- height walls lengths L 24 t.
Total length of brace wall line TL 28 ft.
full height sheathing S L 100
TL S 85 71 percent
F2w2
Dtaghragm stress v 0.35 TL v 145 34 plf
0.35 FRw2 0 35 F2w2
Rim/blocking stress v
Shearwall stress v
5036463777 TO 5036240155 P 18
TL
035 FRw2 +035 F2w2
v 349 05 plf
0 89 L
Uplift for shearwall length L1 11 ft.
(worst case)
Pu v 9 5 Wd Ll R1
Tvne "C" Shearwalls w/ HTT22 holdowns
v 266.27 plf
Weight Wd 110 plf
Rl 400
Pu 2 14 x 10 pounds
Architecture Engineering, Inc
.DRAW{NG
El
El
fl
11
El
10
Proj ect. Structural Notes
Location. Pacific Northwest
'Copyright 1993
OWNERSHIP OF DOCUMENTS
The "diamond" shearwall designation system details were created by
Fuller. Architecture Engineering, Inc (FAE) and are copyright protected
property of FAE and shall not be used unless issued from FAE
Copyright 1993
LEGEND
1
NOTES
SIMSPON 'Hl' TYPE C3EAA MANGER
SIMPSON GLB' TYPE 3L. r 1ANGER
DESIGNATES GRID LINE
DESIGNATES DETAIL MARK
DESIGNATES SHEARWALL TYPE
DESIGNATES HOLDOWN TYPE
(SEE SHEAR SCHEDULE)
PERFORATED SHEARWALL
SEE DETAIL #30
DESIGNATES DRAWING NOTE
DESIGNATES H.O. LOCATION (APPROXIMATE)
SIMPPON 'HUxx TYPE BEAM HANGER
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'EPC' TYPE POST CAP
DESIGNATES 6X DFL #1 POST W/ SIMPSON 'ECC' TYPE POST CAP
(3) 2 x (WALL WIDTH) BUNDLED STUDS TO SUPPORT ROOF FRAMING ABOVE.
SIMPSON 'MSTC52' FASTENED TO DBL. JOISTS OR BEAM. SEE DETAIL 6
(2) STUDS UNDER BEAM CONTINUOUS DOWN TO FOUNDATION.
By RF Sheet No
Date 1/2007 1
Job No 7000
DOUBLE FLOOR JOISTS. NAIL FLOOR SHEATHING TO EACH JOIST WITH (2) ROWS
10d COMMON NAILS AT 6' 0 C.
A 'DRAG SHEAR TRUSS' DESIGN TRUSS FOR 150 PLF DIAPHRAGM SHEAR.
TRANFERRED FROM TOP TO BOTTOM CHORDS THROUGH THE WEB MEBERS WITH CUMULATIVE
FORCE RESISTED AT ONE END OF THE BOTTOM CHORD.
Architecture Engineering. Inc
SHEARWALL SCHEDULE
MARK WALL COVER FASTENERS e PANEL
EDGES
66 WALLED
NAIL OR 1
'W' "6 SCREW
16GA STAPLE
/41\ 5/8 G.W.B.
/E3\ A.P.A.
RATED SHT'G
/C\ 1/16 A.P.A.
RATED SHT'G 0.148 x 2114" 4" O.C.
F RH. P -NAIL
�D\ 1/16 A.P.A. 0.148 "m x 2 3u O.0
FULL ROUND-
'RATED SHT'G STAGRD
HEAD P -NAIL
/E\ 1/16 A.P.A. 0.148 x 2
RATED SHT'G ULL ROUND 4 O 0
EACH SIDE EAD P -NAIL,
1/16 A.P.A. 0.148 m x 2 2 O.C.
RATED SHT'G ULL ROUND- STAGRD
EACH SIDE EAD P NAIL
1- 4OLDOIJN SCI-1EDULE NOTES
"X" DESIGNATES SIMPSON PRODUCT
MARK` HOLDOWN I FASTENERS
NO
HOLDOWN
REQUIRED
'MSTC40'
"MSTC52
'MSTC66
'PHD 5
-OR
'HDU -4
°HTT22"
-OR
'HDU -5
F1-1D6
'HDU 5
-OR
'HDQ -8
10.131'. x 2
0.145 x 2
0.1314'x2 "1
(15) 16d SINKER
NAILS AT EACH END
(24) 166 SINKER
NAILS AT EACH END
(34) 16d SINKER
NAILS AT EACH END
'CMST12 (43) lad SINKER
\4y 9 0 "LONG NAILS AT EACI -I END
SIMPSON 'SSTB24
SIMPSON '5STB24
SIMPSON 'SST1328
SIMPSON 'SSTB28
(15)(96) SIMPSON "SST152S"
'HDU 11' or W/ 9/64 CUT WASHER
'1..)HDQ1l' 4 HEAVY HEX NUT
(15)(16) 1' DIA. (A36) GALV
'141-IDQI4 ROD EMBED 8 INTO
10 12 THK. x 21 WIDE
10' 0' LONG FTC.
DESIGNATES SHEAR PANEL
AND HOLDOWN TYPE.
DESIGNATES APPROXIMATE
HOLDOWN LOCATION
Project. Structural Details
Location Pacific Northwest
Copyright 1993
INTERM. SOLE (9) BLOCKING/ (9) 5 "4' x 1"
STUDS PLATE RIM JOIST EMB. ABs
4" 0.0 4" 0.0 16640 oc
3 O.0 J 6 0.C f l6d 31,2 "oc
4 O.C.
6" O.G. 12 O.G. STAGRD
3" O.0 12" O.0 1669 21/2"�c
STAGRD
12 O.0 16de 3 "oc
STAGRD
12" O.G. 1666 2 "oc
STAGRD
12 O.0 16de 1 "oc
STAGRD
166 TOENAILS
AT 8 O.0
(3)
"LTP5'e 48 oc
(3)
'LTP5 24 oc
(3)
'LTPS'e 16 oc
(3)
LTPS'e 10' oc
3)
'LTPS'e 6 oc
By RE
Date 1/2007
Job No 7000
48 O.0
REFERENCES TO SEE NOTES ABOVE
Sheet No
2-
ALL PANEL EDGES
MUST BE BLOCKED
REMARKS
1 1/2 LONG x 1/16 WIDE
45 O.0 STAPLES W/ CROWNS
PARALLEL W/ FRAM'G.
DBL. STUDSBLKG. AT (5)
16 O.0 ADJOINING PANEL EDGES
W /I6d,4T4 O.0
DBL. STUDSBLKG. AT (5)
10' O.C. ADJOINING PANEL EDGES
11.1/16d,4T4 O.0
DBL. STUDSBLKG. (8)(11)
15 O.0 to ADJOIN'G PANEL EDGES
W/ 166 AT 4 4 3X MUDSILL
3X. MUD7SILL AND (8)(11)
12" O.0 3X. STUDS /BLKG. AT
ADJOIN ING PANEL EDGES
PER NEW CODE, ALL ANCHOR BOLTS MUST
HAVE 2 SQUARE X 3/16 HDG PLATE WASHERS
1. ALL FASTENERS USED AT THE COAST AND IN CONTACT UJITH PRESSURE
TREATED MATERIAL MUST BE H0T DIPPED GALVANIZED (I -IDG)
2. 'F RH. P -NAIL DESIGNATES A FULL ROUND HEAD PNEUMATIC DRIVEN
NAIL (106 GALV BOX NAILS MAY SUBSTITUTE FOR 0.1480 P- NAILS)
3 SIMPSON 'RBC BOUNDARY CLIPS TO SUBSTITUTE FOR 'LTP5 AT ROOF
4 SHEATHING ON SHEARWALLS MUST EXTEND DOWN TO SOLE 4 MUDSILL
PLATES AND SHALL NOT BE INTERRUPTED BY ANY WALL BUTTING INTO
THE SHEARWALL.
5 PROVIDE DOUBLE STUDSBLKG. W/ 166 AT 4 O.0 AT ADJOINING PANEL
EDGES TO AVOID SPLITTING, NAIL EACH PANEL EDGE TO ONLY ONE 2X.
6 "SIMPSON" PRODUCTS SHALL BE INSTALLED AS PER MFG. SPECS
1. HOLDOUJNS OCCUR AT ENDS OF SHEAR -WALLS AND SHALL FASTEN
TO A MINIMUM OF (2) STUDS (MIN.) LAMINATED TOGETHER W/ 166 AT 5 o.c.
8 USE LONGER FDN. BOLTS WITH 3X MUDSILL AND SET BOLTS HIGHER
DO NOT INSTALL FDN. VENT WITH1N 12 CLR, OF A HOLDOUN ANCHOR BOLT
9. FASTENERS SPACING APPLIES ONLY AT FULL 1-1E1G1-IT WALL SEGEMENTS
OTHERWISE USE MINIMUM CONSTRUCTION STANDARDS
10 ANCHORS SHALL HAVE MIN 1 3/4 EDGE DISTANCE 4 5 END DISTANCE.
11. WALLS WITH PLYWOOD ON EACH SIDE SHALL OFFSET PLYWOOD EDGE
JOINTS ON ONE SIDE OF THE .SHEARWALL FROM THOSE ON THE OTHER
EXTEND PLYWOOD THROUGH CORNER AS SHOWN IN DETAIL 14 TO
ACHIEVE MINIMUM SHEARWALL WIDTH SHOWN ON PLANS
12 SHEARWALLS WITH OVERDRIVEN NAILS PENETRATING SURFACE BY MORE
THAN I/8 WILL BE REQUIRED TO BE RENAILED USE A RUBBER
GROMMET IN HEAD OF NAIL -GUN AND ADJUST AIR PRESSURE 50 NAIL
HEADS ARE FLUSH WITH OR SLIGHTLY RECESSED INTO SHEATHING.
13 ALL STUD WALLS MUST HAVE DOUBLE TOP PLATES W/ I5-6 AT 8 O.0
AND STUDS 15 o.c. PLATES SHALL LAP A MINIMUM 4 -m AT SPLICES
WITH AT LEAST EIGHT 156 NAILS EACH SIDE OF SPLICE
14 HOLDOUJN TYPES W/ GREATER NUMERICAL DESIGNATION MAY
SUBSTITUTE FOR HOLDOWNS WITH LESSER. SEE CHART TO THE LEFT
15 USE 3000 PSI CONCRETE IN STEMWALL. PROVIDE (2) *4 CONT T 4 5
IN STEMWALLS WITH THESE HOLDOUJNS EXTEND 10' 0" PAST HOLDOUJNS
16 FASTEN TO (4) 2x5 FULL -HGT STUDS FASTEN EACH STUD TOGETHER W/
(2) ROWS 156 AT 6 O.G. STAGGERED EDGE NAIL WALL PLY TO EA. STUD
IN 51-IADED AREAS FASTEN SHTHG. AT 4 O.C. AT BOUNDARIES OP
SHADED AREA AND PANEL EDGES BLOCK PANEL EDGES W/ 2"
NOMINAL FLAT BLOCKING. USE 86 COMMON NAILS FOR ROOF.AND
106 AT FLOORS /CLGS USE 5/8 OSB OR PLY SHTHG. AT CEILINGS
Architecture Engineering. Inc
APA -RATED
ROOF SHEATHING
BOUNDARY
NAIL (5N.)
2 X SOLID
FRIEZE BD
2 X STUD WALL
O
SIMPSON 'LTPS'
SEE SCHEDULE
FOR SPACING
SHEARWALL
O
EXTEND WALL
SHTHIG DOUN
TO TOP WALL
PLATE 4 EN.
EDGE NAIL (EN)
SEE NOTE
BEL
X 001= F M E T E
PLY. SPLICE PT.
EDGE: NAILING
SIMPSON 'LTPS'
RECOMMEND
USING 'DRY'
LUMBER RIM
JOIST OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
THIS DETAIL ALWAYS APPLIES.
10d m 4 O.C.
10dc4 O.C.
SIMPSON 'HI' TIE AT
EACH RAFTER ALONG
ENTIRE PERIMETER
NOTE. 'H10 -2' MAY
SUBSTITUTE FOR 'HI'
NOTE. IMP 9-125' MAY
SUBSTITUTE FOR 'HI' AS
LONG AS 'R8C' CLIPS AT
24 o.c. ARE USED TO
CONNECT THE FRIEZE BD
TO TOP WALL PLATE.
PLYWOOD
DECK SHEATHING
JOIST
T
1 -2 X BLOCK'G
EA SIDE m 48'
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR 'LTPS'
APA -RATED
SHEATHING
JO IST /SNEARWALL
SOLE PLATE
NAILING SEE
SCHDE FOR INFO
(4)10d EA. BLK.
FLOOR JOISTS
2 X STUD WALL
APA -RATED
SHEATHING
PARALLEL JOISTS
THIS DETAIL ALWAYS APPLIES.
Project. Structural Details
Loe Pacific Northwest
0 f Copyright 1993
xn
2 X BLOCKING AT
6 -0' O.0 W/ (3) I0d
TOENAILS TO PLATE
APA -RATED
ROOF SHEATHING
ad 4 O.C.
2X FLAT BLK'G
W/ 16d 4' O.C.
INTO WALL I!?I
I
1 Pre
O
END OF
2X WALL
By RF
Date 1/2007
Job No 7000
2
51-EARWALL
PLYWOOD
SHEATHING
10d 4 O.G.
END OF 2x4
Sheet No
RAFTER OR
TRUSS —EN.
FLOOR
SHTH'G.
2 X SOLID BLKG.
W/ SIMPSON 'LS50'
2X BLKG. W/
16d AT 6 O.C.
EN.
—I/2 SHTHG W/ 10d AT 4 O.C.
EDGES, BLOCK. EDGES.
SEE SH'WALL SCHEDULE
FOR ADDITIONAL INFO
2 X STUD WALL
STRUCTURAL CE IL INCA
I 16d 8 o.c.
SOLID 15LK.1
SIMPSON 'LS50'
FOR 'LIPS
MAY SUBSTITUTE
SIMPSON LTPS JOIST
SEE SCHEDULE
FOR SPACING SHEARWALL
I0d m 6 O.C. AT FLOOR
AT DSGR, PROVIDE 2x4
x 5 -0' LONG NAILED TO
BOTTOM CHORD W/ 16d AT
4 O.C. STAGriERRED
PREDRILL HOLES FOR
CONNECTOR SCREWS
DRAC-� STI UT
SOLID BLK'G.
APA -RATED
SHEATHING
30I ST /SI-EAfiRWALL
4 DRAG STRUT
/III iiTi
SOLID BLKG
EA. SIDE 5 -0'
AWAY FROM END
OF DRAG STRUT
BM.
CONNECTOR SEE PLAN
FOR SIZE. INSTALL W/
EQUAL LENGTH TO DRAG
STRUT AND WALL.
TiFTG.
Architecture Engineering Inc
X
X
.0
I I
07
is
'UPON WALL
OND
PROv DE 18" HK—
AT EN OF
WALL INF
SOLE PLATE
NAILING SEE
SCHEDULE
I
FLOOR 1 •4 CONT HORIT.� 11'
AT TOP 1 BOTTO 1
I I
II
J 111
CONC. STEM WALL
NORMAL JOISTS
TI-415 DETAIL ALWAYS APPLIES.
EDGE NAIL SIDE WALL
61-1Tf-rG TO 4x6 STUD
I
(12) Ibd—
I
I MIN. PLY WIDTH I I.
EA. SIDE I' 10'
•.1
1'
r
.3
4' -0"
SIMPSON 'MSTC28"
EA. SIDE (4- TOTAL)
GARAGE -FRAME
DETAIL
Project Stnictural Details
Location Pacific Northwest
c0 Copyright 1993
"PA RATED,
BREATHY' FASTENED
LI P
TO MUDSILLATE
EDGE NAIL (EN)
SIMPSON 'L350" ANCHOR
(NOT REO'D IF SHTH'G
EXTENDS CONT TO MUDSILL
W /OUT ANY !JOINTS)
EDGE NAIL (EN)
x 1 EMB. AB's
W/ 2 X 2 X 3/16
PLATE WASHERS OR
SIMP 'BP 5/8 -2"
•4 DOWELS 48 O.C.
(MINIMUM)
NOTE
EXTEND GARAGE
DOOR HEADER
OVER ENDWALL.
HEADER WIDTH TO
MATCH WALL WIDTH
NAIL SHEATHING TO
HEADER W/ 0.148 "0 x
2"4 F RH. P -NAILS
3 O.G. BOTH WAYS
4x6 STUD EA END
W/ ADD'L 2X NAILER
CORNER W /16d•
AA
GRGE
V APA -RATED SHTH'G
FROM A SINGLE SHEET
BOTH SIDES W/ 0.148 "0
F RH P -NAILS INTO
4x6 W/ (2) ROWS AT 2' oc.
EXTEND PLYWD THRJ
COMER SEE PET 14
6X SOLID BLOCKING
AT SHEATHING SPLICE
SIMPSON 'PHD6
4x6 PLATES W/ (2) 5/8 "0X12'
J -BOLTS AT 5 o.c. W/
SIMP BPg%5' WASHERS
(2) ROWS OF NAILS AT I I/2"
STAGGERED TO MUDSILL
SIMPSON 'LTP4 EA. END'
•4 HAIRPIN BAR x1-4
I I I I
Jl 8" CONCRETE WALL WI 2 -3
11 (2) •4 DOWELS EA. END
U UNDER SHEARWALL
(2) •4 X 1 -6' 0
.N
\-12" SR CONT FTG.
1N•N
24 "x "X 12" FTG.
4' -0" W/ (3) •4 CENTEF2ED
BELOW R4ISED STEMWALL
(4)10d •3 O.C.—
PLYWOOD
DECK SHEATHING
IF FLOOR JOIST
SYSTEM, PROVIDE
2 X BLOCKING
12" O.G. W/ (3)
1Od TOENAILS
TO PLATE
Ilu
14
1 r"
j 1I
II
CONC. STEM WALL II I
By RF
Date 1/2007
Job No 7000
THIS DETAIL ALWAYS APPLIES.
2ATED
SHEATHR�',.
SOLE PLATE
NAIL!NG
EDGE NAIL (EN)
EDGE HAIL (EN)
0 4 CO'HT HORIZ T 4 B
a'• x 1' EMS. AB'a
W/2 7C2 X /16
PLATE WASHERS OR
SIMP 'BP 5/8-7'
•4 DOWELS 48 O.G.
FARALLEL JO IST S
F'ONYWALLS 4 -0' AND TALLER MUST BE
APPROVE BY ENGINEER. OTHERWISE OK
rrrl} 1 r r
I •I
1 1
f
I f
•1
1 1
I I1
I 11 i
I 1
1 1 f I
II 1111
(h fltl
Il an
II '14 CONT T 15
•(MINIMUM)
If
•II•
11 CONCRETE FOUNDATION
rr
•1 I
:PONYW TO:H.aYE
TYPE 'tt' SHEAR
•R EQUIREr'•IENT5 (11 1N.)
JI
6 4 DOWELS 48' O.C.
MIN. (2 2X6 STUDS AT
HOLDOLLNS EDGE
NAIL PLY TO STUDS
PROVIDE SOLID WOOD
HOLDOILN STUDS
SIMPSGN "L55O" AT
SAME SPACING 45 "LTPS
I i1
Sheet No
SIMPSON
I- 101DOWN
436'1HREADED
ROD WITH SAME
DI R AS
ANC Cp R BOLT
SIMPSON 'CNW' COUPLE''?
t
11 if 51C If '$T.4 BOLT
11 kir
ri.
ti
ti
if
II
e FON,r'UJALL
Architecture Engineering, Inc
SOLE PLATE
NAILING
BOUNDARY
NAIL
SOL ID BLK'G.
EDGE NAIL I
SHEATHING
EDGE NA1L
PLY TO
HOLDOU N
STUDS
Z
W i
0 d it 1111 L436) THIRI=ADED' ROD
Ci IL .11• II0 W/. &IMPSQN. '5$T" ADHESIVE.
w .I U (SPECIAL.tNSPECTION
II REQUIRED .15Y CODE)
11 11
:II'
(2) -2 X 6
BLOCK'G
WALL
SHEATHING
IF BEAM 1S
UPTURNED USE
2x6 LEDGER
W /I6dAT6 °oe
STAGG'RD
--r RIM JOIST
JOIST
SIMPSON 'LIPS'
SEE SCHEDULE
FOR SPACING
2 X STUD WALL
APA -RATED
WALL SHEATHING
CANTILEVER JST
LAM. 5111D5
TOGETHER W/
16d AT 6 O.C.
CONCRETE FOUNDATION
13 MISSING 1-10L !DOWN 4NGI --4OR
RUN PL O 1
CONT TO
BOTTOM
SEE DET •2 SEE PLAN IF PLYWOOD
IF BM EXTENDS CEILING IS REQUIRED
BELOW CEILING FASTEN RAFTER TO WALL
PLATE W/ SIMPSON 'Hl'
SEE DET. 1 FOR ADD'L INFO
Project: Structural Details
LoCatlon Pacific Northwest
0 Copyright 1993
SIMPSON 'L650
MAY SUBSTITUTE
FOR "LTPS'
0 0
Inl
.1111:
tLd
hr�� ROOF LEDGER 1:)E 1✓
ANCHOR EMBED
DIAMETER DEPTH
5/8' 1 10'
3/4" I II"
1/5" 1 13'
HOLDOWN
GRADE 436'
THREADED ROD
SEE SIMPSON
CATOLOG FOR
DIAMETER
1
BOUND NAIL ROOF PLYWD TO
2 X 10 LEDGER W/ BEVELED
TOP TO MATCH ROOF SLOPE.
NAIL LEDGER UJ/ (2) -16d EA
WALL STUD 4 EA. 2 x 6 BLK'G.
(USE 2x 5 BLKG. IF TRUSS ROOF)
FOR THIS SECTION OF ROOF
BLOCK PANEL' EDGES W/ 2 X 4
FLAT NAIL 8d 4' O.C. EDGES
AND BOUNDARIES, 12' O.G. IN FIELD
SHEARWALL PLYWD MUST EXTEND
DOWN TO BOTTOM WALL PLATE
(TYP.)
APA -RATED
WALL
SHEATHING
(2) -2x OR
4x (REF.TO
PLANS)
HOLDOWN
STRAP WRAP
AROUND DEL
JOISTS
SIMPSON
'HT530'
EA. SIDE OF
DBL. JOISTS
(PROVIDE WEB
STIFFENDER IF
I -JOIST USED)
13y RF
Date 1/2007
Job No 7000
Sheet No
5
SOLE PLATE
NAILING
BOUNDARY
NAIL
SOLID BLK'G.
CONT RIM 4 SIMPSON `LS50'
2X BLKG. OR MAY SUBSTITUTE
DE R111 JST JOIST FOR 'LIPS'
(12) IOd
EA END
OF STRAP
®1-40LIDOUN TO RIM JST
IF 1H15 IS A SH'WALL
W/ A HOLDOLLN,
THEN EMEND 51-1T1-I'G
THRU 4 EDGE NAIL
NOTE.
THIS DETAIL IS REQ'D
ONLY WHEN TWO _L
SHEARWALLS SHARE
ONE FHOLDOWN.
FRAMING AT CORNER
8d AT 6' o.c.
AT ALL FRAMING
MEMBERS WITHIN
5' -O' OF EDGE
GABLE END TRUSS
2x4 x 5' -0" LATERAL
BRACE AT 6 -0' e.c.
ON SHEARWALL .ij_ (6) 16d NAIL
REQMTS.BELOW
NAILS BASED
EITHER NO
JOINT IN PLYWOOD
FASTEN SH'WALL TO
ENDLUALL TRUSS W/
BLOCKING/RIM
FASTENERS SHOWN
IN 5I-I'WALL SCHD'L.
SH'WALL SEE
SH'WALL SCHEDULE
FOR NAIL'G REQMTS.
4x6 OR
(2) 2X STUDS
16d AT 6 O.G.
HOLDOa1N
2x4 FLAT AT 24' O.C.
IN END -WALL TR115S
2X VERTICAL BRACE
(2) 10d AT 5' O.G.
2x4 BLKG. AT 6 -0' O.G.
W/ Sd AT 3 OG.
N
TRUSS BOTTOM CHORD OR CEILING JOIST
(2) 16d EA TRUSS
DBL. 2x5OLID BLOCK
W/ (2) 51MP "L550'
TO WALL PLATE
2x6 PLATE W/ 16d
AT 12' o.c. TO WALL
GYPSUM BOARD
DIAPHRAGM WITH
Sd COOLER NAILS
AT 1" O.C. AT FIRST
(4) CEILING MEMBERS
AND 2x6 PLATE
C,41a3LED ENDUJ4LL
IF "H" EXCEEDS 6 -0" THEN INSTALL
2x4 ON EDGE BEHIND 2x4 FLAT IN
END -WALL TRUSS. IF 'H" EXCEEDS
12' -0' USE 2x6 ON EDGE. SEE ABOVE.
DBL. JOIST AT
EACH END OF WALL
OVER DBL. STUDS
FASTEN TO RIM JOIST
W/ SIMPSON 'L90'
HOLDOU.N
l6d AT 6 0.C.
INTO EA. STUD
EDGE NAIL
Architecture Engineering, Inc.
fT
pig
16 I Y
INTERFLOOR 1- 4OLDOUJN
II
SHEARWALL
'I HOLDOUN STRAP
2x SOLE fE I (INSTALL STRAP W/
EQUAL LENGTH TO
SEE OR I NFO I BEAM 4 STUDS.
1
1 1 1
1 1 1 1 1.
r c I I .1 I T I
CUT pia x 4' 4
SLOT IN SLANG. I
2x SOLID BLK'G EACH J
SIDE NEXT TO STRAP
1•- i0LDOUJN DETAIL
ROOF
TRUSS
EDGE NAILING (2) 166 IN i O TRUSS TIE CHORDS
2x4 AROUND BLKG.
PANEL PERIMETER
(2)-2x OR 4x
(REF TO PLANS)
DBL. JO15T
OR BEAM
(12) 10d EACH
END OF STRAP
FOR TRUSS- FRAMED ROOFS
r 1
Proj Structural Details
Location Pacific Northwest
C) Copyright 1993
UNLESS OTHERWISE
SPECIFIED,USE (2)
SIMPSON '1-11530'
EA. END OF BEAM
BOUNDARY
NA
L
(SOLID BLK'G.
SIMPSON 'LTPS'
SEE SCHEDULE
N I C FOR SPACING
1
EN. SHTHG. TO
4 STUD W/ STRAP
SOLID WOOD
BELOW BEAM
3' DIA VENT
HOLES AT I0' O.G.
PER IBC 12032
2x4 FLAT EDGE FRAMING
NAILED TO TRUSS VERTICAL
W/ 166 AT 6 O.C.
1/2' PLY SHTH'G. W/
106 AT 4' O.C. EDGES
WALL TOP PLATES
166 AT i 8' 0.0. FROM BUGG.
PANEL TO WALL PLATES
®SHEARWALL EXTENSION
2X SOLE IE
SEE SCHEDULE
FOR INFO
(2) -2x OR 4x
(SEE PLAN)
I3y P.J.
I.)ate 1/2007
Job No 7000
HOLDOILIN STRAP
(INSTALL WITH
EQUAL LENGTH
7O BEAM AND
STUDS.
BN.
DBL. JST
OR BEAM
L 2 X SOLID BLK'G
BELOW ENTIRE LENGTH
OF SHEARWALL.
®l4QLOUJN DETAIL
APA -RATED
ROOF SHEATHING
BOUNDARY
NAIL (BN)
2 X SOLID
FRIEZE BD
2 X STUD U)ALL
SNEARWALL NAILING
SAME AS EaELOW
SOLID BLK'G.
SIMPSON 'LS50'
MAY SUBSTITUTE
FOR "LTPS
CLG. JST
APA -RATED
SHEATHING
Sheet No
S+- 4EARWALL EXTENSION
FOR STICK FRAMED ROOFS
NAIL 86 AT 3 OC. INTO
EACH SHEAR TRUSS FOR
DIAPH It 1-i AA0 UP TO
200 PLF 0T- II:RWISE USE 3 QC.
UNLESS SPECIFIED OTHERWISE,
EITHER &NEAR TRANSFER
SYSTEM MAY BE USED
SHEAR TRUSSES
EACH DESIGNED FOR
DIAPHRAGM SHEAR L040
51-10(1.N ON PLANS
(TRUSS TO TRANSFER SHEAR
FROM TOP TO BOTTOM CHORD)
(4) 16d NAILS
2x6 AT 16 O.C.
W/ (3) 16,6 EA. END
FASTEN TRUSS TO WALL
W/ 'L550' CLIPS
SEE SCHEDULE FOR SPACIt43, 73 s�
SHEARWALL
SHEAR TRUSS MAY BE ELIMINATED IF
SHEARUTALL EXTENDS UP TO ROOF
51.1EATHING. SEE DET no FOR INFO.
22 SNEARUJALL EXTENSION
Architecture Engineering, Inc.
1
FLOOR JOIST -I
2X STUD WALL
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
I-10L D OWN ABOVE
THIS DETAIL ALWAYS APPLIES.
BOLT DECK LEDGER
TO RIM JOIST W/ W.'0
AT I6' 0L. AND (2) ROWS
16cl AT 8' OG.
(USE 2 -5/5' BOLTS IF
JOIST SPAN GREATER
THAN .10
SIMP. "MSTC40"
EA END OF HEADER
FASTEN TO
DBL. STUDS
APA -RATED J
SHEATHING
THIS DETAIL ALWAYS APPLIES.
SEE SCHEDULE FOR
NUMBER OF NAILS
EA. SIDE
BEAM
STRAP SEE
FLOOR PLAN
4 X 8 POST
111
I 1
I 1
1 I
II i
1
Project. Structural Details
Location Pacific Northwest
Q Copyright 1993
II I
HOLDOWN W/ 436
GRADE THREADED ROD
TI- IEADED ROD
SIMPSON 'MSTC'
WRAP STRAP AROUND
HEADER IF NECESSARY
-DRILL HOLE I /8" GREATER IN DIA
IN CENTER OF BEAM FOR BOLT
PILL CAVITY W/ SOLID
WOOD AT HOLDOUNS
II
5' SO X 3/8" BRG PLATE
PEEN THREADS AFTER TIGHTENED
BEAM
EXTERIOR WALL
2X LEDGER
1X BLKG.
AT STRAP
1 5�) 2X6 DIA BRACE
W/ (2) Ibd EA JOIST
ST
224 STRAP WRAP
A 1.ND BACK OF LEDGER
4 NAIL TO DI AG BRACE
DECK LEDGER 1- 1ANDRAIL CONN,
NOTCH 4X8 FOR 3"
BEAM BEARING
SIMPSON "PHD2" W/
5/8" X 8" EXP BOLT
ONCRETE FTG.
2s S1-- 1EA1RUJALL- i=OST CONN.
SIMPSON ABU"
POST BASE
OR ELEVATED
"EF'B' IF SLAB
OR USE BASE
CONN. SNOWN IN
DETAIL '30
2X SPACED CEDAR
DOUBLE 2X
JOIST
BEAM
PERP.NDICULAR WALL
CONNECT WALLS TOGETHER BY FIRS
NAILING END 2x4 TO CHANNEL W/
(S) Ibd THEN INSTALL ADDITIONAL
2x4 AGAINST- IT AND NAIL W/ (5) I5d
N
PLYWOOD SHEATHING
OVER WALL STUDS
By RF
Date 1/2007
Job No 7000
1 1
L_J
DBL. 2X MEMBER OR
4X MEMBER RIM JOIST.
'4 X 3" X 6 X S"
STEEL ANGLE
4 1 72 4
5/8 "0 THROUGH BOLTS W/ NUTS
AND I DIA X 9/16 WASHERS.
EA SIDE. 4X5 CEDAR NEWELL
TO RIM J015T
�MULTIPULE (5) Ibd 2 NAILS AT THE TOP
HOLDOWN1 SR1DS MIDDLE, 4 BOTTOM
SEE SCHEDULE
CUT 1" X 47 SLOT IN PLY
FLOOR SHTHG FOR STRAP
SIMPSON "H2.5"
EA. SIDE 4 X 12 BEAM
EDGE NAIL (EN.)
TO END 2x4
T1-1I8 DETAIL ALWAYS APPLIES.
T -1
6EAh1
PRESSURE TREATED
WOOD POST
CONCRETE SLAB
CONC. FTCs.
0 1=ORC1-1/1DECK FOST CONN
UNLESS NOTED OTHERWISE,
USE 'SIMPSON' PC'
POST CAP
(USE "EPC' AT
ENDS OF SEAM)
Sheet No
51EARUJALL- EXT WALL CONN
EDGE
NAIL
Architecture Engineering, Inc
NAIL 5HTHG TO
GIRDER TRUSS W/
Sd AT 6 O.G.
BOUNDARY
NAIL (BN)
2 X SOLID
FRIEZE BD
NAIL WALL 51-ITHG.
TO EA. HOLDOWN
STUD W /10de6
FOR 2 -STORY
CONDITION, USE
'MSTC28' STRAP
DIRECTLY BELOW
GIRDER TRUSS
TIEAOUN ABOVE
RECOMMEND
USING 'DRY'
LUl-18ER RIM
JOIST OR 'LSL
RIM BOARD TO
MINIMIZE BUCKLING
OF SHEATHING
NAIL (16) 12d
EACH END
TO STUDS ONLY
SEE DETAIL "11
TRUSS BOTTOM
CHORD OR
CEILING JOISTS
TI-415 DETAIL ALWAYS APPLIES
CONNECTOR SEE PLAN
FOR SIZE. INSTALL W/
EQUAL LENGTH TO WALL
AND BLOCKING.
NOTE.
THIS DETAIL NOT REQ'D
IF TRUSS MFG. GALCS SHOW
LESS THAN 1000" NET
UPLIFT FORCE AT GIRDER
TRUSS REACTION. IF 50
THEN USE (2) 'i.42.5T' TIES
MULTIPLE 2X STUDS (SAME
NUMBER AS TRUSSES)
(4)10d EA. BlIK
FLOOR JOISTS
G I FRDE fR TRL SS CNN
(2) BAY OF
4X SOLID BLKG
W/ (2) 16d EA. END
1111
i
Project. Structural Details.
Location. Pacific Northwest
Q Copyright 1993
SIMPSON 'LGT' TIEDOWN
AT EA. GIRDER TRUSS
2 X BLOCKING AT
6 -0' O.0 WI (3) 10d
TOENAILS TO IFLATE
MULTIPLE 2X STUDS (SAME
NUMBER AS Tii USSES)
NAIL WALL SHTI
TO EA. STUD W%
I0d AT 6 OC.
FASTEN CLG. TO
BLKG. W/ DRYWALL
SCREWS AT 4 O.C.
RE- ENTRANT
CORNER
3� W4LL- TO- CE!L�G� cor.�N
NAIL FULL -HGT STUD
TO BEAM W/ (2) ROWS
16d AT 3 O.G. STAG'RD
FULL -HGT
WALL
PANEL
APA -RATED 51 -ITHG.
FILLER ON SIDE OF M.
EDGE NAIL (EN.)
2 X STUDS W/
16d AT 8' O.C.
STAGGERED
SUPPORT POST
TO BEAR ON FELT
WALL TOP
PLATES
NAIL WALL SHTHG
TO F.H. STUDS W/
1001 AT 6 O.C.
zg fE3M- TO -W4LL Care
EXTERIOR VIEW
30" FELT MOISTURE
BARRIER OVER
5000 P5I NON- SHRINK
GROUT (THK. mudslf
CONCRETE FOUNDATION
EDGE NAIL
EDGE
NAIL (EN.)
11
I I
WHEN PANEL 15 1 1
I I
24 29' WIDE,
PROVIDE 'LTP5
EACH END
AT BASE
By RFF
Date 1/2007
Job No 7000
Fir
FOS TO -FDN CONN
PERFORATED /WALL DESIGsNATION
m
EDGE NAIL
AROUND
OPENING
THIS DETAIL ALWAYS APPLIES
Sheet No
TIE WALLTOP
PLATES TOGETHER
W/ MSTC40 STRAP
STOP RIM JOIST
EA. SIDE OFSM
FASTEN TO F.H.
STUD W/ (2) I0d TN.
FULL -HGT STUD EA.
SIDE OF BEAM
BEAM TO BEAR ON
ON FULL AREA OF
2X STUDS LAMINATED
W/ I6d AT 12' O.C.
NOTE:
(4) 2x6 LAM. W/ 1601 AT 8 O.C.
EQUALS A 6x6 SUPPORT POST
HOL.DOWN EA. SIDE
USE 'HDSA UNLESS
NOTED OTHERWISE
P T I" IUDSILL
STOP AT GROUT
5/8' m EXP BOLT W/
4 1/2 MIN. EMBED
EDGE
NAIL (EN.)
RIM JOIST
SEE 5CH'DL
FOR 'LTP5'
SPACING
FEiRFOTR4TED W4LL NAILING
SEAM
Architecture Engineering, Inc
[A T/ WALL
14 SEE PLAN
z
T/ F00TINC
(3) '4 CONT
T4B
FACTORY GLUED
BR.:a. BLOCK
COLUMN CAP
SEE PLAN FOR TYPE
r
"H" (4 -P. MAX-)
II MIN.
T/ WALL I
SEE PLAN
-t
T/ FOOTING
SEE PLAN
I 2' -0"
1; MIN.
H' 2 I' -6
MIN. MIN.
FOUNDATION STE F
'THIS DETAIL ALWAYS APPLIES.
HD ANCHOR EMBED
DIAMETER DEPTH
5/8' 110"
3/4" I II"
1/8" 1 13"
ADD'L BARS IF
SPECIFIED ON PLANS
Si-- 1EAIRUJALL AT SL E-
THIS DETAIL ALWAYS APPLIES.
4 -0"
II 0
;0 11 0
11
I' y
1 J
1.
I,
Project Shearwall Schedule
Location Pacific Northwest
Copyright 1993
MATCH FOOTING 2 r IV
AND ORS Its* J
2' -0'
APA RATED
SHEATHING.
5/8"a ABe OR
5/5"0 EXP 0OLT5
(51 MIN. EMBEDMT)
AT HOLDCUNS, USE
(A36) THREADED ROD
W/ SIMPSON 'SET' ADHESIVE.
f (SPECIAL INSPECTION
REQUIRED BY CODE)
I° a
■1
I
FOOTING DEPTH (HD
EMBEDMENT DEPTH 4
15' UJ4.0 U5E 14 (MIN) DEPTH
I -I0LE5 MUST SE SPACED
AT LEAST 18' APART
I
57E1
FOOTING
UNDISTURBED
EARTH
ACCEPTABLE AREA TO DRILL
MAX 2 3/4' DIAMETER HOLE.
HOLES MUST BE AT LEAST
3 -0' FROM SUPPORTS 4 MIDSPAN
AND IN THE MIDDLE THIRD
OF THE SEAM DEPTH.
CILULAM -BEAM FEIN ETiATIONS
11415 pETAIL ALWAYS APPLIES.
2X6 FLAT W/
16d EA TRUSS
ed b O.C.
OVERFR.AMING
TRJSSES OR
2X FRAMING
EXTEND ROOF
5HT14 DOIN
TO BLKG.
PREFAB TRUSSES
OR 2X FRAMING
S p
iZOOP OVEr2FF A1" 11NC
TI-115 DETAIL ALWAYS APPLIES.
4 -5AYS OF 4X BLKG.
APA -RATED I0d a 4 O.C.
FLOOR SHEATHING
:I :I
0.F 43r
0
a
m
s.
t
n
By RI'
Date 1/2007
Job No 7000
IF R4 Efa 15 .E55
THAN L FROM
SHEARJJ..0 L,'lf+ N; 1
BLOCK (2)- BAYS
51MPSON 'PHD5 HOLDOWJ F.A.
END W/ 5/8' DIA (A36) THRD ROD
STUD WALL
IF LLSA I E 7 I
FALLS DIRECTLY �m
1 BELOW A RAFTER
THEN USE DET. r3
2X BLKG. AT 32' 0C.
el
w/ (2) Ibd EA. END
EA. SIDE OF SH'WALL
CEILING J015T F
Sheet No
1=3UTTEF. °y AC STiUT
ROOF 6H16
BN.
APA -RATED
SHEATHING W/
8d a 6 EDGES
4 12" FIELD
16d a EA TRUSS
2X SOLID SLKG.
2X STUD WALL
0 r h
RECtfi11'•i„ JD SHEARWALL 3/16 SHORT
TO ALL.a,u FOR. ./SPTICAL SHRINKAGE OF RAFTERS
8d AT 3' OC.
r- 8d AT 6 OC.
ROOF 51-1T1.4.
RAFTERS
SHEARWALL
TO MATON
BELOW
NAIL BLKG.
TO STUD
514EARIJJALL
C s SHE AfRUJAL,L EXTENSION
S.
Multi- Loaded BeamF 2000 International Building Code (97 NDS)1 Ver 7.01 14
By Jim Mei Suntel Home Design Inc. on: 02 -21 2008 07 4604 AM
Project: WAVERLY Location: Beam Nr 1 garage ceil bm
Summary' j
6.75 IN x 21.0 IN x 20 0 FT 24F V Visually Graded Western Species Dry Use
Section Adequate By 22.9% Controlling Factor Moment of Inertia Depth Required 19 6 In
Center Span Deflections:
Dead Load: DLD- Center=
Live Load: LLD Center=
Total Load: TLD- Center=
Camber Required: C=
Center Span Left End Reactions (Support A)
Live Load: LL- Rxn -A= 9456 LB
Dead Load: DL- Rxn -A= 4808 LB
Total Load TL- Rxn -A= 14264 LB
Bearing Length Required (Beam only support capacity not checked) BL -A= 3.25 IN
Center Span Right End Reactions (Support B):
Live Load: LL- Rxn -B= 9443 LB
Dead Load: DL- Rxn -B= 4866 LB
Total Load: TL- Rxn -B= 14309 LB
Bearing Length Required (Beam on y support capacity not checked) BL -B= 3.26 IN
Beam Data:
Center Span Length. 12= 20.0 FT
Center Span Unbraced Length -Top of Beam: Lu2 Top= 1.0 FT
Center Span Unbraced Length -Bott )m of Beam: Lu2- Bottom= 20.0 FT
Live Load Duration Factor Cd= 1 15
Live Load Deflect. Criteria. L/ 480
Total Load Deflect. Criteria: L/ 360
Center Span Loading:
Uniform Load:
Live Load: wL 2=
Dead Load: wD -2=
Beam Self Weight: BSW=
Total Load: wT -2=
Point Load 1
Live Load. PL1 2= 1437 LB
Dead Load PD1 2= 1686 LB
Location (From left end of span) X1 -2= 6.5 FT
Point Load 2
Live Load. PL2 2= 1437 LB
Dead Load: PD2 2= 1686 LB
Location (From left end of span) X2 2= 14 0 FT
Trapezoidal Load 1
Left Live Load: TRL- Left-1 -2=
Left Dead Load: TRD -Left-1 2=
Right Live Load: TRL Right -1 -2=
Riqht Dead Load: TRD- Right -1 2=
Load Start: A -1 -2=
Load End B -1 2=
Load Length C -1 2=
Trapezoidal Load 2
Left Live Load: TRL- Left -2 -2=
Left Dead Load: TRD -Left -2 2=
Right Live Load: TRL Right -2 2=
Right Dead Load: TRD- Right -2
Load Start:
Load End: I`
Load Length:
Trapezoidal Load 3
Left Live Load: T.. 2
Left Dead Load: Ti
Right Live Load: TRL- Ri•‘4;it- 7-
Right Dead Load TRD Right -3 -z=
Load Start: A -3 -2=
Load End: B -3 -2=
Load Length C -3 -2=
Properties For 24F V4- Visually Graded We :tern Species
Bending Stress: Fb= 2400 PS
Shear Stress. Fv= 190 PS
Modulus of Elasticity E= 1800000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bending Stress of Comp. Face in Tension Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension) Fb'= 2551 PS
Adjustment Factors: Cd =1 15 ::1 =1 00 Cv =0.92
Fv' Fv'= 219 PS
Adjustment Factors: Cd =1 15
0.20 IN
0.35 IN U691
0.54 IN U442
0.29 IN
0 PLF
0 PLF
31 PLF
31 PLF
970 PLF
338 PLF
970 PLF
338 PLF
0 0 FT
6.5 FT
6.5 FT
970 PLF
338 PLF
970 PLF
338 PLF
14 0 FT
20 0 FT
6 0 FT
520 PLF
195 PLF
520 PLF
195 PLF
6 5 FT
14 0 FT
7.5 FT
Page. 2
Multi- Loaded Bbam[ 2000 International Building Code (97 NDS)1 Ver 7.01 14
By Jim Mei Suntel Home Design, Inc. on: 02 21 2008 07 4604 AM
Project: WAVERLY Location: Beam Nr 1 garage ceil bm
Design Requirements:
Controlling Moment: M= 68418 FT -LB
9.8 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear V= 12167 LB
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead Toads and live Toads on span(s) 2
Comparisons With Required Sections:
Section Modulus (Moment) Sreq= 321.80 N3
S= 49613 N3
Area (Shear) Areq= 83.53 N2
A= 141 75 N2
Moment of Inertia (Deflection) Ireq= 4238.09 N4
I= 5209.31 N4
A
Multi- Loaded Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 21 2008
Project: WAVERLY Location. Beam Nr 1 garage ceil bm
Summary
6.75 IN x 21.0 IN x 20 0 FT 24F V4 T Visually Graded Western Species Dry Use
Section Adequate By 22.9% Controlling Factor Moment of Inertia Death Required 19.6 In
r LOADING DIAGRAM rz
Reactions
Live Load Dead Load Total Load Uolift Load
A 9456 Lb 4808 Lb 14264 Lb 0 Lb
B 9443 Lb 4866 Lb 14309 Lb 0 Lb
Center Span
TI 1
Uniform Loading
Live Load Dead Load Self Weiaht Total Load
W 0 Plf 0 Plf 31 Plf 31 Plf
y,i
Center Span 20 ft
Trapezoidal Loading
Left LL Left DL Riaht LL Right DL Load Start Load End
TR1 970 Plf 338 Plf 970 Plf 338 Plf 0 Ft 6.5 Ft
TR2 970 Plf 338 Plf 970 Plf 338 Plf 14 Ft 20 Ft
TR3 520 Plf 195 Plf 520 Plf 195 Plf 6 5 Ft 14 Ft
Point Loading
Live Load Dead Load Location
P1 1437 Lb 1686 Lb 6.5 Ft
P2 1437 Lb 1686 Lb 14 Ft
TR2
J
Roof Beamf 2000 International Building Code (97 NDS)1 Ver 7.01 14
By Jim Mei Suntel Home Design, Inc. on: 02 -21 -2008 07:20:17 AM
Project: WAVERLY Location Beam Nr 2 bm under dormer walls
Summary
3.5 IN x 9.5 IN x 10.0 FT #2 Douglas- Fir -Larch Dry Use
Section Adequate By 10.3% Controlling Factor Section Modulus Depth Required 9 05 In
Deflections.
Dead Load: DLD=
Live Load: LLD=
Total Load: TLD=
Reactions (Each End)
Live Load: LL -Rxn=
Dead Load: DL -Rxn=
Total Load: TL -Rxn=
Bearing Length Required (Beam only support capacity not checked) BL=
Beam Data:
Span. L=
Maximum Unbraced Span. Lu=
Pitch Of Roof RP=
Live Load Deflect. Criteria. L/
Total Load Deflect. Criteria. L/
Roof Loading.
Roof Live Load -Side One: LL1=
Roof Dead Load -Side One. DL1=
Tributary Width -Side One TW1=
Roof Live Load -Side Two LL2=
Roof Dead Load -Side Two DL2=
Tributary Width -Side Two: TW2=
Roof Duration Factor Cd=
Wall Load: WALL=
Beam Self Weight: BSW=
Slope /Pitch Adjusted Lengths and Loads.
Adjusted Beam Lenqth: Ladi=
Beam Uniform Live Load: wL=
Beam Uniform Dead Load: wD_adj=
Total Uniform Load: wT=
Properties For #2 Douglas- Fir -Larch
Bending Stress Fb=
Shear Stress: Fv=
Modulus of Elasticity E_
Stress Perpendicular to Grain. Fc_perp=
Adjusted Properties
Fb' (Tension) Fb'=
Adjustment Factors. Cd =1 15 CI =1 00 CF =1 10
Fv' Fv'=
Adjustment Factors. Cd =1 15
Design Requirements.
Controlling Moment: M=
5.0 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear V=
At a distance d from support.
Critical shear created by combining all dead and live Toads.
Comparisons With Required Sections.
Section Modulus (Moment) Sreq=
S=
Area (Shear) Areq=
A=
Moment of Inertia (Deflection) Ireq=
1=
0 13 IN
0 08 IN U1552
0.20 IN L/590
687 LB
1120 LB
1808 LB
0 83 IN
10.0 FT
1.33 FT
9 12
360
240
25 0 PSF
17.0 PSF
4 0 FT
25 0 PSF
17 0 PSF
1.5 FT
1 15
100 PLF
7 PLF
10.0 FT
138 PLF
224 PLF
362 PLF
900 PSI
95 PSI
1600000 PSI
625 PSI
1136 PSI
109 PSI
4520 FT -LB
1555 LB
47 74
52.65
21.35
33.25
101.68
250.07
N3
N3
N2
N2
N4
N4
A
Roof Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 21 2008
Project: WAVERLY Location. Beam Nr 2 bm under dormer walls
Summary'
3.5 IN x 9.5 IN x 10.0 FT /#2 Douglas- Fir -Larch Dry Use
Section Adequate By 10.3% Controlling Factor Section Modulus Depth Required 9.05 In
LOADING DIAGRAM
Reactions
Live Load Dead Load Total Load Uplift Load
A 687 Lb 1120 Lb 1808 Lb O Lb
B 687 Lb 1120 Lb 1808 Lb O Lb
Span
Uniform Loading
Live Load Dead Load Self Weight Total Load
W 138 Pif 217 PIf 7 PIf 362 Plf
Multi- Loaded Beamf 2000 International Building Code (97 NDS)1 Ver 7.01 14
By Jim Mei Suntel Home Design, Inc. on: 02 -21 -2008 07:20:34 AM
Project: WAVERLY Location. Beam Nr 3 16' garage dr hdr
Summary
5.125 IN x 13.5 IN x 16.5 FT 24F V4 Visually Graded Western Species
Section Adequate By 12.9% Controlling Factor Moment of Inertia Depth
Center Span Deflections
Dead Load:
Live Load:
Total Load:
Camber Required:
Center Span Left End Reactions (Support A)
Live Load:
Dead Load:
Total Load:
Bearinq Length Required (Beam only support capacity not checked)
Center Span Right End Reactions (Support B)
Live Load:
Dead Load:
Total Load
Bearing Length Required (Beam only support capacity not checked)
Beam Data.
Center Span Length.
Center Span Unbraced Length -Top of Beam:
Center Span Unbraced Length -Bottom of Beam:
Live Load Duration Factor
Live Load Deflect. Criteria.
Total Load Deflect. Criteria.
Center Span Loading:
Uniform Load.
Live Load:
Dead Load:
Beam Self Weight:
Total Load:
Point Load 1
Live Load.
Dead Load:
Location (From left end of span)
Point Load 2
Live Load:
Dead Load:
Location (From left end of span)
Trapezoidal Load 1
Left Live Load:
Left Dead Load:
Right Live Load:
Right Dead Load:
Load Start:
Load End:
Load Length:
Trapezoidal Load 2
Left Live Load:
Left Dead Load:
Right Live Load
Right Dead Load.
Load Start:
Load End
Load Length.
Trapezoidal Load 3
Left Live Load:
Left Dead Load:
Right Live Load:
Right Dead Load:
Load Start:
Load End:
Load Length:
Properties For 24F V4- Visually Graded Western Species
Bending Stress:
Shear Stress.
Modulus of Elasticity
Stress Perpendicular to Grain.
Bending Stress of Comp. Face in Tension:
Adjusted Properties
Fb' (Tension)
Adjustment Factors Cd =1 00 CI =1 00
Fv'
Adjustment Factors* Cd =1.00
Dry Use
Required 12.96 In
DLD- Center=
LLD Center=
TLD- Center=
C=
LL- Rxn -A=
DL- Rxn -A=
TL- Rxn -A=
BL -A=
LL- Rxn -B=
DL- Rxn -B=
TL- Rxn -B=
BL -B=
L2=
Lug Top=
Lu2- Bottom=
Cd=
L/
wL -2=
wD -2=
BSW=
wT -2=
PL1 -2=
PD1 2=
X1 -2=
PL2 -2=
PD2 2=
X2 2=
TRL- Left-1 -2=
TRD- Left-1 -2=
TRL Right -1 -2=
TRD- Right -1 -2=
A -1 -2=
B -1 2=
C -1 2=
TRL -Left-2 2=
TRD- Left-2 -2=
TRL Right -2 -2=
TRD- Right -2 2=
A-2 2=
B -2 2=
C -2 -2=
TRL Left-3 -2=
TRD Left-3 -2=
TRL Right -3 -2=
TRD- Right -3 -2=
A -3 -2=
B -3 -2=
C -3 -2=
Fb=
Fv=
E=
Fc perp=
Fb_cpr=
Fb'=
0.21
0.27
0 49
0.32
2181 LB
1852 LB
4033 LB
1.21 IN
2301 LB
1777 LB
4078 LB
1.22 IN
16.5 FT
1.33 FT
16.5 FT
1 00
480
360
0 PLF
0 PLF
15 PLF
15 PLF
687 LB
1125 LB
4 0 FT
1100 LB
1125 LB
12.0 FT
110 PLF
55 PLF
110 PLF
55 PLF
0.0 FT
4 0 FT
4 0 FT
220 PLF
83 PLF
220 PLF
83 PLF
4 0 FT
12.0 FT
8 0 FT
110 PLI=
55 PLF
110 PLF
55 PLF
12.0 FT
16.5 FT
4.5 FT
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2395 PS
Fv'= 190 PS
IN
IN L/725
IN U406
IN
Page. 5
Multi- Loaded Beamf 2000 International Buildinq Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on: 02 21 2008 07:20:34 AM
Project: WAVERLY Location. Beam Nr 3 16' garage dr hdr
Design Requirements:
Controllinq Moment: M=
8 745 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead Toads and live loads on span(s) 2
Controllinq Shear V=
At a distance d from riqht support of span 2 (Center Span)
Critical shear created by combining all dead Toads and live Toads on span(s) 2
Comparisons With Required Sections.
Section Modulus (Moment) Sreq= 91.35
Area (Shear) Areq= 1 30 79
A= 69 19
Moment of Inertia (Deflection) Ireq= 930.80
1= 1050 79
18235 FT -LB
3900 LB
N3
N3
N2
N2
N4
N4
A
Multi- Loaded Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 21 2008
Project: WAVERLY Location: Beam Nr 3 16' garage dr hdr
Summary
5 125 IN x 13 5 IN x 16 5 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate Bv• 12.9% Controlling Factor Moment of Inertia Depth Required 12.96 In
LOADING DIAGRAM
Center Span
P1
Reactions
Live Load Dead Load Total Load Uplift Load
A 2181 Lb 1852 Lb 4033 Lb 0 Lb
B 2301 Lb 1777 Lb 4078 Lb 0 Lb
Uniform Loading
Live Load Dead Load Self Weight Total Load
W 0 Plf 0 Plf 15 Plf 15 Plf
Point Loading
Live Load Dead Load Location
P1 687 Lb 1125 Lb 4 Ft
P2 1100 Lb 1125 Lb 12 Ft
7f R2
Ji
Center Sp 16.5 ft
Trapezoidal Loading
Left LL Left DL Riaht LL Right DL Load Start Load End
TR1 110 Pif 55 Plf 110 Plf 55 Plf 0 Ft 4 Ft
TR2 220 Plf 83 Plf 220 Plf 83 Plf 4 Ft 12 Ft
TR3 110 Plf 55 Plf 110 Plf 55 Plf 12 Ft 16.5 Ft
P2
B
Multi -Span Floor Beamf 2000 International Building Code (97 NDS)1 Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 21 -2008 07:20:50 AM
Project: WAVERLY Location: Beam Nr 4 at grt rm ceiling
Summary
5 125 IN x 9.0 IN x 12.5 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By 63.5% Controlling Factor Moment of Inertia Depth Required 7.64 In
Span Deflections.
Dead Load: DLD- Center=
Live Load: LLD Center=
Total Load: TLD- Center=
Camber Required C=
Span Left End Reactions (Support A)
Live Load: LL- Rxn -A=
Dead Load: DL- Rxn -A=
Total Load: TL- Rxn -A=
Bearing Length Required (Beam only support capacity not checked) BL -A=
Span Right End Reactions (Support B)
Live Load LL- Rxn -B=
Dead Load DL- Rxn -B=
Total Load: TL- Rxn -B=
Bearing Length Required (Beam only support capacity not checked). BL -B=
Beam Data.
Center Span Length.
Center Span Unbraced Length -Top of Beam.
Center Span Unbraced Length -Bottom of Beam:
Live Load Deflect. Criteria.
Total Load Deflect. Criteria.
Camber Adjustment Factor
Center Span Loading:
Uniform Load:
Floor Live Load:
Floor Dead Load:
Floor Tributary Width Side One.
Floor Tributary Width Side Two
Beam Self Weight:
Wall Load:
Total Live Load:
Total Dead Load:
Total Load:
Point Load
Live Load:
Dead Load
Location (From left end of span)
Properties For 24F V4- Visually Graded Western Species
Bending Stress:
Shear Stress.
Modulus of Elasticity
Stress Perpendicular to Grain:
Bending Stress of Comp Face in Tension
Adjusted Properties
Fb' (Tension).
Adjustment Factors. Cd =1 00 CI =1 00
Fv'
Adjustment Factors. Cd =1 00
Design Requirements:
Controlling Moment:
6.25 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections.
Section Modulus (Moment)
Center
Center
Center
Area (Shear)
Moment of Inertia (Deflection)
L2=
Lu2 Top=
Lu2- Bottom=
L/
L/
CAF=
FLL -2=
FDL -2=
Trib -1 2=
Trib -2 2=
BSW=
Wall-2=
wL 2=
wD -2=
wT -2=
PL -2=
PD -2=
X 2=
Fb=
Fv=
E=
Fc perp=
Fb_cpr=
Fb'=
Fv'=
M=
V=
Sreq=
S=
Areq=
A=
Ireq=
I=
0 11
0.25
0.36
0 16
1925
784
2709
0.81
1625
672
2297
0 69
12.5
1.33
12.5
360
240
1.5
40 0 PSF
15.0 PSF
6.5 FT
0 0 FT
10 PLF
0 PLF
260 PLF
98 PLF
367 PLF
300 LB
112 LB
0 0 FT
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2397 PS
IN
IN,= L/589
IN U416
IN
LB
LB
LB
IN
LB
LB
LB
IN
FT
FT
FT
X DLD
190 PS
7178 FT -LB
2021 LB
35 93 N3
69 19 N3
15.96 N2
46 13 N2
190 40 N4
311 34 N4
P1
Multi -Span Floor Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on: 02 21 2008
Project: WAVERLY Location. Beam Nr 4 at grt rm ceiling
Summary
5 125 IN x 9 0 IN x 12.5 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By: 63.5% Controlling Factor Moment of Inertia Depth Required 7 64 In
LOADING DIAGRAM
Reactions
Live Load Dead Load Total Load Uplift Load
A 1925 Lb 784 Lb 2709 Lb 0 Lb
B 1625 Lb 672 Lb 2297 Lb 0 Lb
Center Soan
Uniform Loading
Live Load Dead Load Self Weight Total Load
W 260 PIf 98 PIf 10 Plf 367 Plf
Point Loading
Live Load Dead Load Location
P1 300 Lb 112 Lb 0 Ft
W
Center Span 12.5 ft
Multi- Loaded Beamf 2000 International Building Code (97 NDS)1 Ver 7 01 14
By Jim Mei Suntel Home Design Inc. on. 02 21 -2008 07:21:03 AM
Project: WAVERLY Location: Beam Nr 5 kit ceil bm
Summary
5 125 IN x 22.5 IN x 21 0 FT 24F V4 Visually Graded Western Species
Section Adequate By 13.7% Controlling Factor Moment of Inertia Depth
Center Span Deflections.
Dead Load:
Live Load:
Total Load
Camber Required:
Center Span Left End Reactions (Support A)
Live Load:
Dead Load:
Total Load:
Bearing Length Required (Beam only support capacity not checked).
Center Span Right End Reactions (Support B)
Live Load:
Dead Load:
Total Load:
Bearing Length Required (Beam only support capacity not checked)
Beam Data.
Center Span Length:
Center Span Unbraced Length -Top of Beam.
Center Span Unbraced Length -Bottom of Beam.
Live Load Duration Factor
Live Load Deflect. Criteria.
Total Load Deflect. Criteria.
Center Span Loading:
Uniform Load:
Live Load:
Dead Load:
Beam Self Weight:
Total Load
Point Load 1
Live Load
Dead Load
Location (From left end of span)
Point Load 2
Live Load:
Dead Load'
Location (From left end of span)
Trapezoidal Load 1
Left Live Load:
Left Dead Load:
Right Live Load:
Right Dead Load:
Load Start:
Load End
Load Length:
Trapezoidal Load 2
Left Live Load:
Left Dead Load
Right Live Load:
Right Dead Load.
Load Start:
Load End.
Load Length:
Properties For 24F V4- Visually Graded .VVesti m Species
Bending Stress.
Shear Stress:
Modulus of Elasticity
Stress Perpendicular to Grain:
Bending Stress of Comp. Face in Tension.
Adjusted Properties
Fb' (Tension) Fb'=
Adjustment Factors: Cd =1 00 CI =1.00 Cv =0.94
Fv' Fv'=
Adjustment Factors. Cd =1 00
Design Requirements:
Controlling Moment: M=
11 13 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead Toads and live loads on span(s) 2
Controlling Shear V=
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead Toads and live loads on span(s) 2
Comparisons With Required Sections:
Dry Use
Required 21.56 In
DLD- Center=
LLD Center=
TLD- Center=
C=
LL- Rxn -A=
DL- Rxn -A=
TL- Rxn -A=
BL -A=
LL- Rxn -B=
DL- Rxn -B=
TL- Rxn -B=
BL -B=
L2=
Lu2 Top=
Lu2- Bottom=
Cd=
L/
L/
wL -2=
wD -2=
BSW=
wT -2=
PL1 -2=
PD 1 -2=
X1 2=
PL2 2=
PD2 2=
X2 -2=
TRL -Left-1 2=
TRD- Left-1 -2=
TRL- Right -1 -2=
TRD- Right -1 2=
A -1 2=
B -1 2=
C -1 2=
TRL- Left-2 -2=
TRD -Left -2 2=
TRL Right -2 2=
TRD- Right -2 2=
A -2 2=
B -2 2=
C -2 2=
Fb=
Fv=
E=
Fc perp=
Fb_cpr=
0.22
0 40
0 62
0.33
6905 LB
3466 LB
10372 LB
3 11 IN
7683 LB
4985 LB
12668 LB
3.80 IN
21 0 FT
10 FT
21 0 FT
1.00
480
360
160 PLF
60 PLF
25 PLF
245 PLF
2747 LB
1068 LB
5.5 FT
3321 LB
1291 LB
11.0 FT
450 PLF
406 PLF
450 PLF
406 PLF
11.0 FT
21 0 FT
10.0 FT
0 PLF
0 PLF
240 PLF
90 PLF
0 0 FT
5.5 FT
5.5 FT
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2254 PS
IN
IN U635
IN L/409
IN
190 PS
71403 FT -LB
10818 LB
Paqe: 8
Multi- Loaded Beamf 2000 International Building Code (97 NDS) 1 Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on: 02 21 2008 07:21 AM
Project: WAVERLY Location: Beam Nr 5 kit ceil bm
Section Modulus (Moment) Sreq= 380 18 N3
S= 432.42 N3
Area (Shear) Areq= 85 41 N2
A= 115.31 N2
Moment of Inertia (Deflection) Ireq= 4279.37 N4
1= 4864 75 N4
Multi- Loaded Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design Inc. on. 02 -21 2008
Project: WAVERLY Location. Beam Nr 5 kit ceil bm
Summary
5.125 IN x 22.5 IN x 21.0 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate Bv 13.7% Controlling Factor Moment of Inertia Depth Required 21.56 In
LOADING DIAGRAM
P2
A
Center Span
1 1
P1
V
Reactions
Live Load Dead Load Total Load Uplift Load
A 6905 Lb 3466 Lb 10372 Lb 0 Lb
B 7683 Lb 4985 Lb 12668 Lb 0 Lb
Uniform Loading
Live Load Dead Load S elf Weiaht Total Load
W 160 PIf 60 Plf 25 PIf 245 PIf
Point Loading
Live Load Dead Load Location
P1 2747 Lb 1068 Lb 5.5 Ft
P2 3321 Lb 1291 Lb 11 Ft
1w■
Center Span 21 ft
Trapezoidal Loading
Left LL Left DL Riaht LL Riaht DL Load Start Load End
TR1 450 PIf 406 PIf 450 Plf 406 PIf 11 Ft 21 Ft
TR2 0 Plf 0 Plf 240 PIf 90 Plf 0 Ft 5.5 Ft
TR I
Uniformly Loaded Floor Beam(2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 -21 -2008 07.21 15 AM
Project: WAVERLY Location: Beam Nr 6 at grt rm ceiling
Summary
5.5 IN x 9.5 IN x 12.5 FT /#2 Douglas- Fir -Larch Dry Use
Section Adequate By 19.2% Controlling Factor Section Modulus Depth Required 8 7 In
Deflections:
Dead Load: DLD= 0.08 IN
Live Load: LLD= 0.19 IN L/775
Total Load: TLD= 0.28 IN L/539
Reactions (Each End).
Live Load: LL -Rxn= 1125 LB
Dead Load: DL -Rxn= 493 LB
Total Load. TL -Rxn= 1618 LB
Bearing Length Required (Beam only support capacity not checked) BL 0 47 IN
Beam Data:
Span: L= 12.5 FT
Unbraced Lenqth -Top of Beam. Lu= 1.33 FT
Live Load Deflect. Criteria. L/ 360
Total Load Deflect. Criteria: LJ 240
Floor Loading'
Floor Live Load -Side One. LL1= 40 0 PSF
Floor Dead Load -Side One: DL1= 15 0 PSF
Tributary Width -Side One: TW1= 3 5 FT
Floor Live Load -Side Two LL2= 40.0 PSF
Floor Dead Load -Side Two DL2= 15 0 PSF
Tributary Width -Side Two TW2= 1 0 FT
Live Load Duration Factor Cd= 1 00
Wall Load: WALL= 0 PLF
Beam Loading:
Beam Total Live Load: wL= 180 PLF
Beam Self Weight: BSW= 11 PLF
Beam Total Dead Load: wD= 79 PLF
Total Maximum Load: wT= 259 PLF
Properties For #2 Douglas- Fir -Larch
Bending Stress. Fb= 875 PSI
Shear Stress: Fv= 85 PSI
Modulus of Elasticity E= 1300000 PSI
Stress Perpendicular to Grain. Fcperp= 625 PSI
Adjusted Properties
Fb' (Tension) Fb'= 874 PSI
Adjustment Factors: Cd =1 00 CI =1 00 CF =1 00
Fv'= 85 PSI
Fv'
Adjustment Factors: Cd =1 00
Design Requirements:
Controlling Moment:
6.25 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections.
Section Modulus (Moment):
Area (Shear)
Moment of Inertia (Deflection)
M= 5055 FT -LB
V= 1424 LB
Sreq= 69.38
S= 82.73
Areq= 2512
A= 52.25
Ireq= 182.51
I= 392.96
N3
N3
N2
N2
N4
N4
A
Uniformly Loaded Floor Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on: 02 21 2008
Project: WAVERLY Location: Beam Nr 6 at grt rm ceiling
Summary
5.5 IN x 9.5 IN x 12.5 FT /#2 Douglas- Fir -Larch Dry Use
Section Adeauate By 19.2% Controlling Factor Section Modulus Depth Reauired 8 7 In
LOADING DIAGRAM
Reactions
Live Load Dead Load Total Load Uplift Load
A 1125 Lb 493 Lb 1618 Lb O Lb
B 1125 Lb 493 Lb 1618 Lb O Lb
Span
Uniform Loading
Live Load Dead Load Self Weight Total Load
W 180 PIf 68 Plf 11 PIf 259 Plf
Span 12.5 ft
Multi -Span Roof Beamf 2000 International Buildinq Code (97 NDS) 1 Ver 7.01 14
By Jim Mei Suntel Home Design, Inc. on 02 -21 -2008 07:21:32 AM
Project: WAVERLY Location. Beam Nr 7 Br wndw hdr
Summary
3.125 IN x 10.5 IN x 5.5 FT 24F V4 Visually Graded Westem Species
Section Adequate By 50.4% Controlling. Factor Area Depth Required 7
Center Span Deflections.
Dead Load:
Live Load:
Total Load:
Camber Required:
Center Span Left End Reactions (Support A)
Live Load:
Dead Load:
Total Load:
Bearing Lenqth Required (Beam only support capacity not checked)
Center Span Right End Reactions (Support B)
Live Load:
Dead Load:
Total Load
Bearing Length Required (Beam only support capacity not checked)
Beam Data.
Center Span Length:
Center Span Unbraced Length -Top of Beam:
Center Span Unbraced Length -Bottom of Beam.
Live Load Duration Factor
Pitch Of Roof
Live Load Deflect. Criteria.
Total Load Deflect. Criteria.
Camber Adjustment Factor
Center Span Loading:
Uniform Load
Roof Live Load:
Roof Dead Load
Roof Tributary Width Side One:
Roof Tributary Width Side Two:
Beam Self Weight:
Wall Load:
Total Live Load:
Total Dead Load (Adjusted for Roof Pitch).
Total Load:
Point Load
Live Load:
Dead Load:
Location (From left end of span)
Properties For 24F V4- Visually Graded Western Species
Bending Stress:
Shear Stress:
Modulus of Elasticity
Stress Perpendicular to Grain:
Bending Stress of Comp Face in Tension:
Adjusted Properties
Fb' (Tension). Fb'=
Adjustment Factors. Cd =1 15 CI =0.99
Fv' Fv'=
Adjustment Factors. Cd =1 15
Design Requirements:
Controllinq Moment: M=
2.035 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead Toads ar d live loads on span(s) 2
Controlling Shear V=
At a distance d from left support of span 2 (Center Span)
Critical shear created by combining all dead Toads and live loads on span(s) 2
Comparisons With Required Sections.
Section Modulus (Moment) Sreq=
Shear
S=
Area
(Shear) Areq=
A=
Moment of Inertia (Deflection) Ireq=
1=
Dry Use
16 In
DLD Center=
LLD- Center=
TLD- Center=
C=
LL- Rxn -A=
DL- Rxn -A=
TL- Rxn -A=
BL -A=
LL- Rxn -B=
DL- Rxn -B=
TL- Rxn -B=
BL -B=
L2=
Lu2 Top=
Lu2- Bottom=
Cd=
RP=
U
L/
CAF=
RLL 2=
RDL 2=
Trib -1 -2=
Trib -2 -2=
BSW=
Wall -2=
wL 2=
wD -2=
wT 2=
PL-2=
PD -2=
X 2=
Fb=
Fv=
E=
Fc perp=
Fb_cpr=
0 02 IN
0 03 IN L/2025
0.06 IN U1199
0.03 IN
2214 LB
1525 LB
3738 LB
1.84 IN
1736 LB
1200 LB
2937 LB
1 45 IN
5.5 FT
2.0 FT
5.5 FT
1 15
0 12
360
240
1.5 X DLD
25 0 PSF
17.0 PSF
14.5 FT
1.5 FT
7 PLF
0 PLF
400 PLF
272 PLF
679 PLF
1750 LB
1190 LB
2.0 FT
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2739 PS
219 PS
6099 F7 -LB
3178 LB
26 72
57 42
21 82
32.81
60.33
301 46
N3
N3
N2
N2
N4
N4
A
Multi -Span Roof Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 -21 2008
Project: WAVERLY Location. Beam Nr 7 Br wndw hdr
Summary
3 125 IN x 10 5 IN x 5.5 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By 50 4% Controlling Factor Area Depth Required 7 16 In
LOADING DIAGRAM
Center Span
Point Loading
Live Load Dead Load Location
P1 1750 Lb 1190 Lb 2 Ft
P1
Reactions
Live Load Dead Load Total Load Uplift Load
A 2214 Lb 1525 Lb 3738 Lb 0 Lb
B 1736 Lb 1200 Lb 2937 Lb 0 Lb
Uniform Loading
Live Load Dead Load Self Weiaht Total Load
W 400 PIf 272 Plf 7 PIf 679 PIf
Center Span 5.5 ft
Uniformly Loaded Floor Beam( 2000 International Building Code (97 NDS)1 Ver 7 01 14
By' Jim Mei Suntel Home Design, Inc. on. 02 21 2008 07:21 48 AM
Proiect: WAVERLY Location: Beam Nr 8 at foyer ceiling
Summary'
3.125 IN x 9 0 IN x 10.5 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By 106 9% Controlling Factor Section Modulus Depth Required 7 05 In
Deflections:
Dead Load: DLD=
Live Load: LLD=
Total Load: TLD=
Reactions (Each End)
Live Load LL -Rxn=
Dead Load: DL -Rxn=
Total Load: TL -Rxn=
Bearing Length Required (Beam only support capacity not checked) BL=
Camber Regd. C=
Beam Data:
Span. L=
Unbraced Length -Top of Beam Lu=
Live Load Deflect. Criteria: L/
Total Load Deflect. Criteria. L/
Camber Adjustment Factor CAF=
Floor Loading
Floor Live Load -Side One LL1=
Floor Dead Load -Side One. DL1=
Tributary Width -Side One: TW1=
Floor Live Load -Side Two LL2=
Floor Dead Load -Side Two: DL2=
Tributary Width -Side Two. TW2=
Live Load Duration Factor Cd=
Wall Load WALL=
Beam Loading:
Beam Total Live Load: wL=
Beam Self Weight: BSW=
Beam Total Dead Load: wD=
Total Maximum Load: wT=
Properties For 24F V4- Visually Graded Westem Species
Bending Stress: Fb=
Shear Stress. Fv=
Modulus of Elasticity' E=
Stress Perpendicular to Grain. Fc perp=
Bending Stress of Comp. Face in Tension: Fb_cpr=
Adjusted Properties
Fb' (Tension). Fb'=
Adjustment Factors: Cd =1 00 CI =1 00
Fv' Fv'=
Adjustment Factors: Cd =1 00
Design Requirements.
Controlling Moment: M=
5.25 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear V=
At a distance d from support.
Critical shear created by combining all dead and live Toads.
Comparisons With Required Sections.
Section Modulus (Moment) Sreq=
S=
Area (Shear) Areq=
A=
Moment of Inertia (Deflection) Ireq=
I=
0 07 IN
0.17 IN =L/750
0.24 IN L/534
1103 LB
445 LB
1548 LB
0.76 IN
0.10 IN
10.5 FT
1.33 FT
360
240
1.5 X DLD
40 0 PSF
15 0 PSF
5.25 FT
40 0 PSF
15.0 PSF
0 0 FT
1 00
0 PLF
210 PLF
6 PLF
85 PLF
295 PLF
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2392 PS
190 PS
4063 FT -LB
1331 LB
20.39 N3
42.19 N3
10.51 N2
28 13 N2
91 15 N4
189.84 N4
A
Uniformly Loaded Floor Beam[ 2000 International Building Code (97 NDS) Vet 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 -21 2008
Project: WAVERLY Location: Beam Nr 8 at foyer ceiling
Summary
3 125 IN x 9 0 IN x 10.5 FT -24F V4 Visually Graded Western Species Dry Use
Section Adequate By 106.9% Controlling Factor Section Modulus Depth Required 7 05 In
LOADING DIAGRAM
Reactions
Live Load Dead Load Total Load Uplift Load
A 1102 Lb 445 Lb 1548 Lb OLb
B 1102 Lb 445 Lb 1548 Lb OLb
Span
Uniform Loading
Live Load Dead Load S elf Weiaht Total Load
W 210 Plf 79 Plf 6 Plf 295 Plf
Span 10.5 ft
Uniformly Loaded Floor Beam( 2000 International Building Code (97 NDS)1 Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on 02 -21 2008 07:22:05 AM
Project: WAVERLY Location: Beam Nr 9 at foyer ceiling
Summary
5 125 IN x 9 0 IN x 7.0 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By 467.8% Controlling Factor Area Depth Required 4.28 In
Deflections:
Dead Load: DLD=
Live Load: LLD=
Total Load: TLD=
Reactions (Each End):
Live Load: LL -Rxn=
Dead Load: DL -Rxn=
Total Load: TL -Rxn=
Bearinq Length Required (Beam only support capacity not checked) BL=
Camber Regd. C=
Beam Data.
Span. L=
Unbraced Length -Top of Beam: Lu=
Live Load Deflect. Criteria: U
Total Load Deflect. Criteria. U
Camber Adjustment Factor CAF=
Floor Loading:
Floor Live Load -Side One LL1=
Floor Dead Load -Side One. DL1=
Tributary Width -Side One. TW1=
Floor Live Load -Side Two LL2=
Floor Dead Load -Side Two. DL2=
Tributary Width -Side Two. TW2=
Live Load Duration Factor Cd=
Wall Load: WALL=
Beam Loading:
Beam Total Live Load: wL=
Beam Self Weight: BSW=
Beam Total Dead Load: wD=
Total Maximum Load: wT=
Properties For 24F V4- Visually Graded Western Species
Bending Stress. Fb=
Shear Stress: Fv=
Modulus of Elasticity E=
Stress Perpendicular to Grain: Fc perp=
Bending Stress of Comp Face in Tension: Fb_cpr=
Adjusted Properties
Fb' (Tension) Fb'=
Adjustment Factors: Cd =1 00 CI =1 00
Fv' Fv'=
Adjustment Factors: Cd =1.00
Design Requirements.
Controlling Moment: M=
3.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear V=
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections
Section Modulus (Moment) Sreq= 11.27
S= 69 19
Area (Shear): Areq= 8 12
A= 46 13
Moment of Inertia (Deflection) Ireq= 33 44
1= 311.34
0 01 IN
0.03 IN L/3352
0.04 IN U2372
910 LB
376 LB
1286 LB
0 39 IN
0.02 IN
7.0 FT
1.33 FT
360
240
1.5 X DLD
40.0 PSF
150 PSF
6.5 FT
40 0 PSF
15 0 PSF
0 0 FT
1 00
0 PLF
260 PLF
10 PLF
107 PLF
367 PLF
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2397 PS
190 PS
2251 FT -LB
1029 LB
N3
N3
N2
N2
N4
N4
Uniformly Loaded Floor Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 21 -2008
Project: WAVERLY Location: Beam Nr 9 at foyer ceiling
Summary
5 125 IN x 9 0 IN x 7 0 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By 467.8% Controlling Factor Area Depth Required 4.28 In
LOADING DIAGRAM
r
A
Reactions
Live Load Dead Load Total Load Uplift Load
A 910 Lb 376 Lb 1286 Lb O Lb
B 910 Lb 376 Lb 1286 Lb O Lb
Span
Uniform Loading
Live Load Dead Load Self Weiaht Total Load
W 260 Plf 98 Plf 10 PIf 367 PIf
Span 7 ft
Multi -Span Roof Beam' 2000 International Building Code (97 NDS) 1 Ver 7.01 14
By Jim Mei Suntel Home Design, Inc. on: 02 -21 -2008 07:22:21 AM
Project: WAVERLY Location. Beam Nr 10 at foyer ceiling
Summary
5.125 IN x 9.0 IN x 9.5 FT 24F V4 Visually Graded Western ;Species Dry Use
Section Adequate By 55.5% Controlling Factor Section Modulus Depth Required 7.68 In
Center Span Deflections.
Dead Load. DLD- Center=
Live Load: LLD Center=
Total Load: TLD- Center=
Camber Required: C=
Center Span Left End Reactions (Support A)
Live Load: LL- Rxn -A=
Dead Load: DL- Rxn -A=
Total Load: TL- Rxn -A=
Bearing Length Required (Beam only support capacity not checked) BL -A=
Center Span Right End Reactions (Support B)
Live Load: LL- Rxn -B=
Dead Load: DL- Rxn -B=
Total Load. TL- Rxn -B=
Bearing Length Required (Beam only support capacity not checked) BL -B=
Beam Data.
Center Span Length. L2=
Center Span Unbraced Length -Top of Beam: Lu2 Top=
Center Span Unbraced Length -Bottom of Beam: Lu2- Bottom=
Live Load Duration Factor Cd=
Pitch Of Roof RP=
Live Load Deflect. Criteria. L/
Total Load Deflect. Criteria: L/
Camber Adjustment Factor CAF=
Center Span Loading:
Uniform Load
Roof Live Load: RLL 2=
Roof Dead Load: RDL -2=
Roof Tributary Width Side One Trib -1 -2=
Roof Tributary Width Side Two: Trib -2 2=
Beam Self Weight: BSW=
Wall Load. Wall-2=
Total Live Load: wL 2=
Total Dead Load (Adjusted for Roof Pitch). wD -2=
Total Load. wT -2=
Point Load
Live Load: PL 2=
Dead Load: PD -2=
Location (From left end of span) X -2=
Properties For 24F V4- Visually Graded Western Species
Bending Stress. Fb=
Shear Stress: Fv=
Modulus of Elasticity E=
Stress Perpendicular to Grain: Fc perp=
Bending Stress of Comp. Face in Tension: Fb_cpr=
Adjusted Properties
Fb' (Tension) Fb'=
Adjustment Factors: Cd =1 15 CI =1 00
Fv' Fv'=
Adjustment Factors. Cd =1 15
Design Requirements.
Controlling Moment: M=
5 32 Ft from left support of span 2 (Center Spar
Critical moment created by combining all dead loads =;nc' rive loads on span(s) 2
Controlling Shear V=
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections.
Section Modulus (Moment) Sreq=
S=
Area (Shear) Areq=
A=
Moment of Inertia (Deflection) 'rep=
1=
0 11 IN
0 18 IN L/633
0.30 IN L/386
0 17 IN
2306 LB
1540 LB
3846 LB
1 15 IN
2641 LB
1680 LB
4322 LB
1.30 IN
9.5 FT
1.33 FT
9.5 FT
1 15
0 12
360
240
1.5 X DLD
25.0 PSF
17 0 PSF
14.0 FT
3 0 FT
10 PLF
0 PLF
425 PLF
289 PLF
724 PLF
910 LB
380 LB
6.5 FT
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2756 PS
219 PS
10217 FT -LB
3840 LB
44 49 N3
69 19 N3
26.36 N2
46.13 N2
193 49 N4
311.34 N4
Multi -Span Roof Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on 02 21 2008
Project: WAVERLY Location: Beam Nr 10 at foyer ceiling
Summary
5.125 IN x 9 0 IN x 9 5 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By 55.5% Controlling Factor Section Modulus Depth Required 7.68 In
LOADING DIAGRAM
Reactions
Live Load Dead Load Total Load Uplift Load
A 2306 Lb 1540 Lb 3846 Lb 0 Lb
B 2641 Lb 1680 Lb 4322 Lb 0 Lb
Center Soan
Uniform Loading
Live Load Dead Load Self Weight Total Load
W 425 Plf 289 Plf 10 Plf 724 Plf
Point Loading
Live Load Dead Load Location
P1 910 Lb 380 Lb 6.5 Ft
Center Span 9.5 ft
P1
V
Multi- Loaded Beam[ 2000 International Building Code (97 NDS)1 Ver 7 01 14
BV' Jim Mei Suntel Home Design, Inc. on: 02 -21 -2008 07 :22:36 AM
Project: WAVERLY Location: Beam Nr 11 rafters at dormer
Summary
(3) 1.5 IN x 9.25 IN x 10 0 FT #2 Douglas- Fir -Larch Dry Use
Section Adequate By 41 1% Controlling Factor Section Modulus Depth
Laminations are to be fully connected to provide uniform transfer of loads
Center Span Deflections:
Dead Load:
Live Load:
Total Load:
Center Span Left End Reactions (Support A)
Live Load:
Dead Load:
Total Load:
Bearing Length Required (Beam only support capacity not checked)
Center Span Right End Reactions (Support B)
Live Load:
Dead Load:
Total Load:
Bearing Length Required (Beam only support capacity not checked)
Beam Data.
Center Span Length:
Center Span Unbraced Length -Top of Beam.
Center Span Unbraced Length -Bottom of Beam:
Live Load Duration Factor
Live Load Deflect. Criteria:
Total Load Deflect. Criteria:
Center Span Loading:
Uniform Load
Live Load:
Dead Load:
Beam Self Weight:
Total Load:
Point Load 1
Live Load:
Dead Load:
Location (From left end of span)
Trapezoidal Load 1
Left Live Load
Left Dead Load
Right Live Load:
Right Dead Load:
Load Start:
Load End:
Load Length
Properties For #2 Douglas- Fir -Larch
Bending Stress
Shear Stress:
Modulus of Elasticity
Stress Perpendicular to Grain:
Adjusted Properties
Fb' (Tension)
Adjustment Factors. Cd =1.00 CI =1.00 CF =1 10 Cr =1 15
Fv'
Adjustment Factors: Cd =1 00
Design Requirements:
Controlling Moment:
5.0 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead Toads and live loads on span(s) 2
Comparisons With Required Sections
Section Modulus (Moment)
Area (Shear)
Moment of Inertia (Deflection)
Required 7 79 In
to all members
DLD- Center=
LLD- Center=
TLD- Center=
LL- Rxn -A=
DL- Rxn -A=
TL- Rxn -A=
BL -A=
LL- Rxn -B=
DL- Rxn -B=
TL- Rxn -B=
BL -B=
L2=
Lu2 Top=
Lu2- Bottom=
Cd=
L/
L/
wL 2=
wD -2=
BSW=
wT 2=
PL1 -2=
PD1 2=
X1 2=
TRL -Left-1 2=
TRD -Left-1 2=
TRL Right -1 2=
TRD- Right -1 2=
A -1 -2=
B -1 2=
C -1 2=
Fb=
Fv=
E=
Fcperp=
Fb'=
Fv'=
M=
V=
Sreq=
S=
Areq=
A=
!rep=
1=
0.06
0 08
0 14
624
470
1094
0.39
749
555
1304
0 46
100
2.0
100
1 00
360
240
50 PLF
34 PLF
9 PLF
93 PLF
623 LB
425 LB
5.0 FT
50 PLF
34 PLF
50 PLF
34 PLF
5 0 FT
10 0 FT
5 0 FT
900 PSI
95 PSI
1600000 PSI
625 PSI
1136 PSI
95 PSI
4308 FT -LB
1180 LB
45 49
64 17
18 63
41 63
85 13
296 79
IN
IN U1450
IN U837
LB
LB
LB
IN
LB
LB
LB
IN
FT
FT
FT
N3
N3
N2
N2
N4
N4
Multi- Loaded Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on. 02 -21 2008
Project: WAVERLY Location Beam Nr 11 rafters at dormer
Summary'
(3) 1.5 IN x 9.25 IN x 10 0 FT 1 #2 Douglas -Fir -Larch Dry Use
Section Adequate Bv' 41 1% Controlling Factor Section Modulus Depth Required 7 79 In
LOADING DIAGRAM
Reactions
Live Load Dead Load Total Load
A 624 Lb 470 Lb 1094 Lb
B 749 Lb 555 Lb 1304 Lb
Center Span
Point Loading
Live Load Dead Load Location
P1 623 Lb 425 Lb 5 Ft
Uplift Load
0 Lb
0 Lb
Uniform Loading
Live Load Dead Load Self Weiaht Total Load
W 50 Plf 34 PIf 9 Plf 93 PIf
P1
y
Center Span 10 ft
Trapezoidal Loading
Left LL Left DL Riaht LL Riaht DL Load Start Load End
TR1 50 PIf 34 PIf 50 Plf 34 PIf 5 Ft 10 Ft
TR1
Multi- Loaded Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on 02 -21 2008 07:22:52 AM
Project: WAVERLY Location: Beam Nr 12 at bonus rm ridge
Summary
3 125 IN x 15.0 IN x 20 0 FT 24F! Visually Graded Western Species
Section Adequate By 9.2% Controlling Factor Moment of Inertia Depth
Center Span Deflections.
Dead Load:
Live Load:
Total Load:
Camber Required:
Center Span Left End Reactions (Support A)
Live Load:
Dead Load:
Total Load:
Bearing Length Required (Beam only support capacity not checked)
Center Span Right End Reactions (Support B)
Live Load:
Dead Load:
Total Load:
Bearing Length Required (Beam only support capacity not checked)
Beam Data:
Center Span Length:
Center Span Unbraced Length -Top of Beam.
Center Span Unbraced Length -Bottom of Beam.
Live Load Duration Factor
Live Load Deflect. Criteria:
Total Load Deflect. Criteria:
Center Span Loading:
Uniform Load:
Live Load
Dead Load
Beam Self Weight:
Total Load:
Point Load 1
Live Load:
Dead Load:
Location (From left end of span)
Point Load 2
Live Load:
Dead Load:
Location (From left end of span).
Trapezoidal Load 1
Left Live Load:
Left Dead Load:
Right Live Load:
Right Dead Load:
Load Start:
Load End:
Load Length:
Trapezoidal Load 2
Left Live Load:
Left Dead Load.
Right Live Load:
Right Dead Load:
Load Start:
Load End:
Load Length.
Trapezoidal Load 3
Left Live Load:
Left Dead Load
Right Live Load:
Right Dead Load:
Load Start:
Load End:
Load Length.
Properties For 24F V4- Visually Graded Western Species
Bending Stress:
Shear Stress:
Modulus of Elasticity
Stress Perpendicular to Grain.
Bending Stress of Comp. Face in Tension.
Adjusted Properties
Fb' (Tension)
Adjustment Factors: Cd =1 00 CI =0.99
Fv'
Adjustment Factors: Cd =1 00
I I
Dry Use
Required 14.57 In
DLD- Center=
LLD Center=
TLD- Center=
C=
LL- Rxn -A=
DL- Rxn -A=
TL- Rxn -A=
BL -A=
LL- Rxn -B=
DL- Rxn -B=
TL- Rxn -B=
BL -B=
L2=
Lug Top=
Lu2- Bottom=
Cd=
L/
wL -2=
wD -2=
BSW=
wT 2=
PL1 2=
PD1 -2=
X1 2=
PL2 2=
PD2 2=
X2 2=
TRL- Left -1 -2=
TRD -Left-1 2=
TRL Right -1 2=
TRD- Right -1 -2=
A -1 2=
B -1 2=
C -1 2=
TRL -Left-2 2=
TRD -Left-2 2=
TRL Right -2 2=
TRD- Right -2 2=
A -2 -2=
B -2 2=
C -2 2=
TRL- Left -3 -2=
TRD- Left-3 -2=
TRL Right -3 -2=
TRD- Right -3 -2=
A -3 -2=
B -3 -2=
C -3 -2=
Fb=
Fv=
E=
Fc perp=
Fb_cpr=
Fb'=
Fv'=
0.39
0.52
0 92
0.59
2252 LB
1686 LB
3938 LB
1.94 IN
2252 LB
1686 LB
3938 LB
1 94 IN
20 0 FT
2.0 FT
20.0 FT
1 00
360
240
0 PLF
0 PLF
10 PLF
10 PLF
624 LB
476 LB
6.0 FT
624 LB
476 LB
14.0 FT
188 PLF
128 PLF
188 PLF
128 PLF
0.0 FT
6 0 FT
6.0 FT
125 PLF
85 PLF
125 PLF
85 PLF
6 0 FT
14 0 FT
8.0 FT
188 PLF
128 PLF
188 PLF
128 PLF
14 0 FT
20 0 FT
6 0 FT
2400 PS
190 PS
1800000 PS
650 PS
1200 PS
2377 PS
190 PS
IN
IN U459
IN L/262
IN
1
Pape. 16
Multi- Loaded BeamE 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim Mei Suntel Home Design, Inc. on: 02 -21 2008 07:22:52 AM
Project: WAVERLY Location Beam Nr 12 at bonus rm ridge
Design Requirements.
Controlling Moment: M=
10.0 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear V=
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead Toads and live loads on span(s) 2
Comparisons With Required Sections.
Section. Modulus (Moment) Sreq= 98.54
S= 117 19
Area (Shear): Areq= 28 00
A= 46.88
Moment of Inertia (Deflection) Ireq= 805.09
1= 878.91
19516 FT -LB
3546 LB
N3
N3
N2
N2
N4
N4
Multi- Loaded Beam[ 2000 International Building Code (97 NDS) Ver 7 01 14
By Jim h;ei Suntel Home Design, Inc. on. 02 21 2008
Project: WAVERLY Location. Beam Nr 12' at bonus rm ridge
Summary•
3 125 IN x 15.0 IN x 20.0 FT 24F V4 Visually Graded Western Species Dry Use
Section Adequate By 9.2% rontrollinq Factor Moment of Inertia Depth Required 14 57 In
LOADING DIAGRAM
TR I
Reactions
Live Load Dead Load Total Load Uplift Load
A 2252 Lb 1686 Lb 3938 Lb 0 Lb
B 2252 Lb 1686 Lb 3938 Lb I 0 Lb
Center Span
Uniform Loading
Live Load Dead Load Self Weiaht Total Load
W 0 Plf 0 Plf 10 Plf 10 Plf
Trapezoidal Loading
Left LL Left DL Riaht LL Riaht DL Load Start Load End
TR1 188 Plf 128 Plf 188 Plf 128 Plf 0 Ft 6 Ft
TR2 125 Plf 85 Plf 125 Plf 85 Plf 6 Ft 14 Ft
TR3 188 Plf 128 Plf 188 Plf 128 Plf 14 Ft 20 Ft
Point Loading
Live Load
P1 624 Lb
P2 624 Lb
Dead Load Location
476 Lb 6 Ft
476 Lb 14 Ft
V-
Center Span 20 ft
V