HomeMy WebLinkAbout2007 O St E - BuildingApplication Number
Pin number
Property Address
ASSESSOR PARCEL NUMBER
Tenant nbr name
Application description
Subdivision Name
Property Use
Property Zoning
Application valuation
PORT OF PORT ANGELES
PO BOX 1350
PORT ANGELES
T\PLANNING \FORMS \1102.15 [1 I /14/2003)
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING DIVISION
321 EAST 5TH STREET PORT ANGELES, WA 98362
04 00000645 Date 7/21/04
713850
2007 S 0 ST E
06 30 00 1 1 1900 1000
HARBOR ACTION INC
PUBLIC WORKS UTILITES
Owner Contractor
WA 983620251
INDUSTRIAL LIGHT
0
OWNER
Permit PUBLIC WORKS COMM WATER SERV
Additional desc 1 ON 1 WATER METER
Permit Fee 1000 00 Plan Check Fee 00
Issue Date 7/21/04 Valuation 0
Expiration Date 1/18/05
Qty Unit Charge Per Extension
BASE FEE 1000 00
Fee summary Charged Paid Credited Due
Permit Fee Total 1000 00 1000 00 00 00
Plan Check Total 00 00 00 00
Grand Total 1000 00 1000 00 00 00
Separate Permits are required for electrical work, SEPA, Shoreline ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature q'Contractor or Authorized t Date Signature of Owner (if owner is builder) Date
PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE
INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE.
INSPECTION TYPE DATE ACCEPTED COMMENTS
FOUNDATION•
FOOTINGS
WALLS
FOUNDATION DRAINAGE /DOWN SPOUTS
ELECTRICAL (LIGHT DEPT) SEPARATE PERM IT
ROUGH -IN
PLUMBING
UNDER FLOOR SLAB
ROUGH -IN
WATER LINE (METER TO BLDG)
GAS LINE
BACK FLOW WATER
AIR SEAL
WALLS
CEILING
FRAMING
JOISTS GIRDERS
SHEAR WALL/HOLD DOWNS
WALLS ROOF CEILING
DRYWALL (INTERIOR BRACED PANEL ONLY)
T -BAR
INSULATION
SLAB
WALL FLOOR CEILING
MECHANICAL
HEAT PUMP
GAS LINE
WOOD STOVE PELLET CHIMNEY
HOOD DUCTS
PW UTILITIES SITE WORK (Engineering Division) SEPARATE PERMIT #'s:
WATERLINE METER
SEWER CONNECTION I
SANITARY
STORM
PLANNING DEPT SEPARATE PERMIT #'s SEPA.
PARKING /LIGHTING ESA.
LANDSCAPING SHORELINE.
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY /USE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES 1 NO
ELECTRICAL LIGHT DEPT
BUILDING PERMIT INSPECTION RECORD
CALL 417 -4815 FOR BUILDING INSPECTIONS. CALL 417 -4735 FOR ELECTRICAL INSPECTIONS.
YES NO
417 -4735 ELECTRICAL
LIGHT DEPT
CONSTRUCTION R.W PW/ CONSTRUCTION R.W
ENGINEERING 417 -4807 PW ENGINEERING
FIRE 417 -4653 I 1 1 I FIRE DEPT
PLANNING DEPT 417 -4750 I 1 1 1 PLANNING DEPT
BUILDING 417 -4815 I I I 1 BUILDING
f• PLANNING \FORMS\1 102.15 [11/14/2003]