HomeMy WebLinkAbout4.670 Original ContractContract Title: Railroad Avenue and Lincoln Street Overlay Project Number: PW -11 -002
THIS CONTRACT is entered into the date last below written between the CITY OF PORT ANGELES,
WASHINGTON "CITY AND Lakeside Industries "CONTRACTOR
1. WORK BY CONTRACTOR
The Contractor shall perform the work as described in Attachment "A" (Attachment "A" may include
Contractor's Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related
Contract Documents) which is attached hereto and by this reference is incorporated herein.
2. TERM OF CONTRACT
All work under this Contract is to be completed as indicated (check one):
All work under this Contract is to be completed by this date:
All work under this Contract is to be completed 3 days from the Notice to Proceed. No work
is to be performed prior to written Notice to Proceed by the City.
The performance period under this Contract commences calendar days after contract
award and ends calendar days after contract award.
3. PAYMENT
A. The City shall pay the Contractor for the work performed under this contract (check one):
City of Port Angeles
Public Works Utilities Dept.
Operations Office
1703 South B Street
Port Angeles WA 98362
Tel: 360 417 -4541
Fax: 360 452 -4972
LIMITED PUBLIC WORKS PROCESS
Request for Quotation
Contract
Time and material, not to exceed:
Time and actual expenses incurred, not to exceed:
Unit prices set forth in the Contractor's bid or quote, not to exceed:
Firm Fixed Price set forth in Contractor bid or quote in the amount of: 20.000.00
The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance
with and as described in the Attachment "A
q, /070
The Contractor shall provide and bear the expense of all equipment, work and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and
completing the work provided for in this contract and every part thereof; except as are
mentioned in the specifications to be furnished by the City of Port Angeles.
B. The Contractor shall maintain time and expense records, which may be requested by the City. The
contractor shall submit invoices to the City for payment for work performed. All invoices must reference the
City's contract number. Invoices shall be in a format acceptable to the City.
C. The City shall pay all invoices from the Contractor by mailing a City warrant within 30 days of receipt of a
properly completed invoice.
D. All records and accounts pertaining to this Contract are to be kept available for inspections by
representatives of the City for a period of three (3) years after final payment. Copies shall be made available
to the City upon request.
Project PW -11 -002 Page 1
Rev 2/03/2010
E. If during the course of the Contract, the work rendered does not meet the requirements set forth in the
Contract, the Contractor shall correct or modify the required work to comply with the requirements of this
Contract. The City shall have the right to withhold payment for such work until it meets the requirements of
the Contract Documents.
4. RESPONSIBILITY OF CONTRACTOR
A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site and
shall comply with all applicable provisions of federal, state and local regulations, ordinances and codes.
Contractor shall erect and properly maintain, at all times, as required by the conditions and progress of the
work, all necessary safeguards for the protection of workers and the public and shall post danger signs
warning against known or unusual hazards.
B. Correction of Defects. Contractor shall be responsible for correcting all defects in workmanship and /or
materials discovered within one year after acceptance of this work. When corrections of defects are made,
Contractor shall be responsible for correcting all defects in workmanship and /or materials in the corrected
work for one year after acceptance of the corrections by the City. The Contractor shall start work to remedy
such defects within seven (7) days of mailing notice of discovery thereof by City and shall complete such
work within a reasonable time. In emergencies where damage may result from delay or where loss of service
may result, such corrections may be made by the City, in which case the cost shall be borne by the
Contractor. In the event the Contractor does not accomplish corrections at the time specified, the work will
be otherwise accomplished and the cost of same shall be paid by the Contractor.
C. Warranty. Contractor shall be liable for any costs, losses, expenses or damages including consequential
damages suffered by the City resulting from defects in the Contractors work including, but not limited to, cost
of materials and labor expended by the City in making emergency repairs and cost of engineering, inspection
and supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be
made against the City as a result of any defective work and the Contractor shall defend any such claims at its
own expense. Where materials or procedures are not specified in the Contract Document, the City will rely on
the professional judgment of the Contractor to make appropriate selections.
D. Nondiscrimination /Affirmative Action. Contractor agrees not to discriminate against any employee or
applicant for employment or any other persons in the performance of this Contract because of race, creed,
color, national origin, marital status, sex, age or handicap, or other circumstances as may be defined by
federal, state or local law or ordinance, except for a bona fide occupational qualification. Contractor agrees to
post in conspicuous places, available to employees and applicants for employment, notices to be provided by
Contractor setting forth the provisions of the nondiscrimination clause.
E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work or
services required by the Contractor under this Contract, shall be considered employees of the Contractor only
and not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of said
employees, while so engaged, and all claims made by a third party as consequence of any negligent act or
omission on the part of the Contractor's employees, while so engaged on any of the work or services
provided or rendered herein, shall not be the obligation of the City.
5. COMPLIANCE WITH LAWS
The Contractor shall comply with all federal, state and local laws and regulations applicable to the work done
under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of a
material provision of this Contract and shall be grounds for cancellation, termination or suspension of the
Contract by the City, in whole or in part, and may result in ineligibility for further work for the City.
6. TERMINATION OF CONTRACT
A. This Contract shall terminate upon satisfactory completion of the work described in Attachment "A" and
final payment by the City.
B. The City may terminate the Contract and take possession of the premises and all materials thereon and
finish the work by whatever methods it may deem expedient, by giving 10 days written notice to the
Contractor, upon the occurrence of any one or more of the events hereafter specified.
Project PW -11 -002
Page 2 Rev. 2/03/2010
1. The Contractor makes a general assignment for the benefit of its creditors.
2. A receiver is appointed as a result of the insolvency of the Contractor.
3. The Contractor persistently or repeatedly refuses or fails to complete the work required herein.
4. Contractor fails to make prompt payment to subcontractors for material or labor.
5. Contractor persistently disregards federal, state or local regulations and ordinances.
6. Contractor persistently disregards instructions of the Contract Administrator, or otherwise
substantially violates the terms of this Contract.
7. The City determines that sufficient operating funds are not available to fund completion of the
work contracted for.
C. In the event this Contract is terminated by the City, Contractor shall not be entitled to receive any further
amounts due under this Contract until the work specified in Attachment "A" is satisfactorily completed, as
scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under
this Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by
the City or which may be sustained by reason of such refusal, neglect, failure or discontinuance of
employment, such excess shall be paid by the City to the Contractor. If the City's expense and damages
exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City
and shall pay such difference to the City. Such expense and damages shall include all legal costs incurred by
the City to protect the rights and interests of the City under the Contract, provided such legal costs shall be
reasonable.
7. OWNERSHIP OF DOCUMENTS
A. On payment to the Contractor by the City of all compensation due under this Contract, all finished or
unfinished documents and material prepared by the Contractor with funds paid by the City under this
Contract shall become the property of the City and shall be forwarded to the City upon its request.
B. Any records, reports, information, data or other documents or materials given to or prepared or assembled
by the Contractor under this Contract will be kept confidential and shall not be made available to any
individual or organization by the Contractor without prior written approval of the City or by court order.
8. CLAIMS
Any claim against the City for damages, expenses, costs or extras arising out of the performance of this
Contract must be made in writing to the City within thirty days after the discovery of such damage, expense
or loss, and in no event later than the time of approval by the City for final payment. Contractor, upon
making application for final payment, shall be deemed to have waived its right to claim for any other
damages for which application has not been made, unless such claim for final payment includes notice of
additional claim and fully describes such claim.
9. GENERAL ADMINISTRATION AND MANAGEMENT
The Director of the Public Works and Utilities Department or his /her designee shall have primary
responsibility for the City under this Contract and shall oversee and approve all work to be performed,
coordinate communications, and review and approve all invoices, under this Contract.
10. HOLD HARMLESS
A. The Contractor shall protect, defend, indemnify and save harmless the City, its officers, employees and
agents from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting
from the negligent acts or omissions of the Contractor. The Contractor agrees that its obligations under this
subparagraph extend to any claim, demand, and /or cause of action brought by, or on behalf of, any of its
employees or agents. For this purpose, the Contractor, by mutual negotiation, hereby waives, as respects the
City only, any immunity that would otherwise be available against such claims under the industrial insurance
provision of Title 51 RCW. In the event the City obtains any judgment or award, and /or incurs any cost
arising therefrom including attorneys' fees to enforce the provisions of this article, all such fees, expenses,
and costs shall be recoverable form the Contractor.
B. The City shall protect, defend, indemnify and save harmless the Contractor, its officers, employees and
agents from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting
from the negligent acts or omissions of the City. The City agrees that its obligations under this subparagraph
extend to any claim, demand, and /or cause of action brought by, or on behalf of, any of its employees or
Project PW -11 -002 Page 3 Rev. 2/03/2010
agents. For this purpose, the City, by mutual negotiation, hereby waives, as respects the Contractor only, any
immunity that would otherwise be available against such claims under the industrial insurance provision of
Title 51 RCW. In the event the Contractor obtains any judgment or award, and /or incurs any cost arising
therefrom including attorneys' fees to enforce the provisions of this article, all such fees, expenses, and costs
shall be recoverable from the City.
11. INSURANCE
The Contractor shall maintain insurance as set forth in Attachment B.
12. PREVAILING WAGE
This Contract is subject to the requirements of Chapter 39.12 RCW, and as it may be amended, relating to
prevailing wages. On Public Works projects, funded in part or in whole with Federal funds, Federal wages
laws and regulations shall also be applicable. NO WORKER, LABORER OR MECHANIC EMPLOYED IN THE
PERFORMANCE OF ANY PART OF THIS CONTRACT SHALL BE PAID LESS THAN THE PREVAILING RATE OF
WAGE as determined by the Industrial Statistician of the Department of Labor and Industries for the State of
Washington. The schedule of prevailing wage rates for this Contract is made a part of this contract as though
fully set forth herein.
Prior to making any payment under this Contract, the City must receive an approved copy of the "Statement
of Intent to Pay Prevailing Wages on Public Works Contracts" from the Department of Labor and Industries.
It is the Contractor's responsibility to obtain and file the "Statement of Intent to pay Prevailing Wage The
Contractor shall be responsible for all filing fees. Each invoice shall include a signed statement that prevailing
wages have been paid by the Contractor and all subcontractors. Following the final acceptance of services
rendered, Contractor shall submit an "Affidavit of Wages Paid
For a contract award or an on -call contract work order under $2,500, and in accordance with RCW
39.12.040(2), the contractor or subcontractor is authorized to submit a combined Statement Of Intent To Pay
Prevailing Wages Affidavit Of Wages directly to the City of Port Angeles at final invoicing. Submission shall
be made on the form developed by the Washington State Department of Labor and Industries and available
from the City of Port Angeles Public Works and Utilities Department.
In case any dispute arises as to what are the prevailing rates of wages for a specific trade, craft or
occupation and such dispute cannot be adjusted by the parties in interest, including labor and management
representatives, the matter shall be referred for arbitration to the Director of the Department of Labor and
Industries, and his decision shall be final, conclusive, and binding on all parties involved in the dispute.
13. INTERPRETATION AND VENUE
This Contract shall be interpreted and construed in accordance with the laws of the State of Washington.
The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington.
14. BRANDS OR EQUAL
When a special "brand or equal" is named it shall be construed solely for the purpose of indicating the
standards of quality, performance, or use desired. Brands of equal quality, performance, and use shall be
considered, provided Contractor specifies the brand and model and submits descriptive literature when
available. Any bid containing a brand which is not of equal quality, performance, or use specified must be
represented as an alternate and not as an equal, and failure to do so shall be sufficient reason to disregard
the bid.
15. INSPECTION AND REJECTION
All goods, services, work, or materials purchased herein are subject to inspection and to approval by the City.
Any rejection of goods, services, work, or materials resulting because of nonconformity to the terms and
specifications of this order, whether held by the City or returned, will be at Contractor's risk and expense.
Project PW -11 -002
16. SUBLETTING OR ASSIGNING OF CONTRACTS
Page 4 Rev. 2/03/2010
Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing
from this Contract without the express prior written consent of the other.
17. INDEPENDENT CONTRACTOR
The Contractor is and shall be at all times during the term of this Contract an independent contractor and not
an employee of the City.
18. EXTENT OF CONTRACT /MODIFICATION
This Contract, together with the attachments and /or addenda, represents the entire and integrated Contract
between the parties hereto and supersedes all prior negotiations, representations, or agreements, either
written or oral. This contract may be amended, modified or added to only by written instrument properly
signed by both parties hereto.
If applicable, have:
19. SUBCONTRACTOR RESPONSIBILITY
A. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall
require each of its subcontractors to include substantially the same language of this section in each of their
subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this
section apply to all subcontractors regardless of tier.
B. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors
meets the following bidder responsibility criteria:
At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter
18.27 RCW;
Have a current state unified business identifier number;
Industrial insurance coverage for the subcontractor's employees working in Washington as
required in Title 51 RCW;
An employment security department number as required in Tile 50 RCW; and
A state excise tax registration number as required in Tile 82 RCW;
An electrical contractor license, if required by Chapter 19.28 RCW;
An elevator contract license, if required by Chapter 70.87 RCW.
Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3).
Project PW -11 -002 Page 5
Rev. 2/03/2010
IN WITNESS WHEREOF, the parties have executed this Contract as of _/S17 2011.
Lakeside Industries Le
Bv:
Printed Name: DAVID t
Title: Q1% IaiA
Address:
City: j2GEl.r
Tax ID Igo /0(5.
Phone Number: ,p() Sa -7
Project PW 11 002
CITY OF PORT ANGELES
Printed Nam
Page 6
r- J
Purchase Order lIPaV1
Rev 2/03/2010
City of Port Angeles
Operations Office
Public Works and Utilities Department
360- 417 -4541
ATTACHMENT "A"
WORK BY CONTRACTOR
The contractor shall do all work and furnish all tools, materials, and equipment in order to
accomplish the project described below. Unless otherwise provided for in the Statement of
Work, the Contractor will be responsible for obtaining and paying for any and all permits
required for this work.
General Scope: Improvements of roadway surface and other work.
Location: Railroad Avenue and Lincoln Street, Port Angeles, Washington
Site Point of Contact: Assistant Civil Engineer James Burke at 360- 417 -4809.
Work Hours and Schedule: The contractor's work hours shall be restricted to 7:00 AM to
10:00 PM, Monday through Friday. Work outside of these hours may be requested from
and is at the discretion of the Parks /Streets Assistant Superintendent. The Contractor shall
provide the listed Site Point of Contact above a schedule, seven calendar days in advance
of commencement of work on this project. Any deviations from the established schedule
shall be coordinated through and subject to the approval of the Site Point of Contact.
Traffic Control: The Contractor shall provide a traffic control plan, and all traffic control
devices and personnel for traffic control. The TTCP will be reviewed by both City personnel
and the contractor at the pre construction conference.
Pre construction Conference: A pre construction conference shall be scheduled with
the lowest responsible bidder after bid opening.
Work Requirements:
This contract provides for the roadway improvements at the intersection of Railroad
Avenue and Lincoln Street, by removing the existing failed pavement and replacing with
hot mix asphalt (HMA) and other work in accordance with details provided below. This
contract incorporates the Washington State Department of Transportation's 2010 Standard
Specifications for Road, Bridge and Municipal Construction referred to herein as the
Standard Specifications, City of Port Angeles' Urban Services Standards and Guide lines, and
Manua/ on Uniform Traffic Control Devices for Streets and Highways
1. The City of Port Angeles shall install necessary catch basin socks prior to Contractor
commencing work.
2. Per the provisions of the current WSDOT Standard Specifications related to public
convenience and safety, the Contractor shall maintain ready access to driveways,
houses, businesses, and buildings along the line of work.
Project PW -11 -002 Page 7
Rev. 2/03/2010
3. Areas of work are illustrated in the attached drawings 1 2 below. Prior to
construction, work boundary shall be marked in white paint by City staff. The total
construction area is approximately 5,700 square yards.
4. The Contractor shall grind and remove 0.1' of the existing asphalt.
5. The end joints of each repaired section listed above shall be 90 degrees to the
surrounding street surface, forming a 20 foot tapered "butt" joint.
6. The Contractor shall place HMA for prelevel 3/8" Class PG 64 -22 and 1/2" HMA Class
64 -22 at a maximum compacted depth of 0.1'.
7. The Contractor shall be responsible for tacking the edges of the patch with CSS -1
before paving.
8. The Contractor shall seal the edges of the patch after paving with AR 4000.
9. Any debris generated from work performed shall be the responsibility of the
contractor. Cost of disposing of debris shall be the responsibility of the contractor.
10.The Contractor shall install GMI 2600 series manhole frame, riser and cover. The
Contractor is required to pick -up and transport manhole frames, covers and risers to
jobsite. Manhole frames, covers and risers will be available for pick -up at the City
Corp. Yard, 1703 B. Street, Port Angeles, WA 98363.
11.All water valve adjustment rings shall be ductile iron.
Project PW -11 -002
A) All manholes shall have existing risers removed and new GMI 2600 Series
manhole frame, riser and cover installed and anchored down per installation
instructions. Installation instruction will be available and provided at the pre
construction conference.
B) All material shall be provided by the City to install the GMI 2600 Series
manhole frame, riser and cover.
C) The existing cast iron manhole ring and cover shall be removed and remain
the property of the City. The contractor shall transport all cast iron rings and
covers to the location directed by the Engineer. Adjust manholes shall be
replaced with new bolt down type frame, covers and rings provide by City.
Page 8 Rev. 2/03/2010
f
'CH'BASIN
TCHBASIN
ITY'STAFF
TRU 3TION
rING WATER VALVE, TYP.
GRIND S NG ASJ HALT 0.1'
PRELEVEL AND HMS► OVERLA` TYP.
20' BUTT JOINT, TYP.
NOTES:
1 ALL WORKM
ACCORDANCE
STANDARDS, 1
WASHINGTON
TRANSPORTA
SPECIFICATIOI
CONSTRUCTIC
AND ANY PRO,
OR CONDITIOP
2 TEMPORARI
MEASURES AF
WITH THE CIr
AND THE CURI
STATE DEPAR
STANDARD SP
AND MUNICIP/
3. EXISTING A
WATER DRAIN
FROM CONSTF
4. THE CONTR
RESPONSIBLE
OF ALL EXISTI
5. A COPY OF
AVAILABLE AT
6 WORK HOUF
TO 10 P M PR
ENGINEERSHP
10PM AND7l
7 THE CITY Ct
NOTIFIED A MII
THE NEED FOI
8. PER THE PF
STANDARD SP
CONVENIENCE
SHALL MAINTA
HOUSES, BUSI
LINE OF WORI
9 SHOULD AC
THE PROJECT
ANTICIPATED
MINUTES, THE
THE TEMPORA
OWNERIRESID
ADVANCE NOT
THE PROPERT
SUCH TEMPOF
r
PER WSDOT STANDARD PLANS
M- 20.50 -01, TYP.
CROSSWALK
PER CITY OF PORT ANGELES
STANDARD CROSSWALK DESIGN, TYP.
STANDARD CROSSWALK DESIGN, TYP.
STOP BAR (16L :r..
PER WSDOT STAN N A Rd PAANS
M- 15.10 -01, TYP.
-24'
LANE MARKER T
STOP BAR AND
'PRE- FORMED F
MARKINGS TO 81
SEE CURRENTT
TRAFFIC STRIPR
UNLESS OTHER%
NOTE:
ALL EXISTING PA
CONSTRUCTION
OTHERWISE SPE
ENGINEER
Insurance Requirements:
1. Minimum Scope of Insurance
The Contractor shall procure and maintain for the duration of the Contract, insurance against claims for
injuries to persons or damage to property which may arise from or in connection with the performance of the
work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the
Contractor to maintain the insurance as required shall constitute a material breach of contract upon which the
City may, after giving five working days notice to the Contractor to correct the breach, immediately terminate
the Contract or at its discretion, procure or renew such insurance and pay any and all premiums in
connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole
discretion of the City, off set against funds due the Contractor from the City.
The Contractor shall obtain insurance of the types described below:
ATTACHMENT B
INSURANCE
a. Automobile Liability insurance covering all owned, non owned, hired and leased vehicles.
Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form
providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide
contractual liability coverage.
b. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and
shall cover liability arising from premises, operations, stop gap liability, independent contractors,
products completed operations, personal injury and advertising injury, and liability assumed
under an insured contract. The Commercial General Liability insurance shall be endorsed to
provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. There shall be no
endorsement or modification of the Commercial General Liability insurance for liability arising
from explosion, collapse or underground property damage. The City shall be named as an
insured under the Contractor's Commercial General Liability insurance policy with respect to the
work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and
Additional Insured Completed Operations endorsement CG 20 37 10 01 or substitute
endorsements providing equivalent coverage.
c. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of
Washington.
2. Minimum Amounts of Insurance
The Contractor shall maintain the following insurance limits:
a. Automobile Liability insurance with a minimum combined single limit for bodily injury and
property damage of $1,000,000 per accident.
b. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each
occurrence, $2,000,000 general aggregate and a $2,000,000 products- completed operations
aggregate limit.
3. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile
Liability and Commercial General Liability insurance.
a. The Contractor's insurance coverage shall be primary insurance as respect to the City. Any
insurance, self- insurance, or insurance pool coverage maintained by the City shall be in excess of
the Contractor's insurance and shall not contribute with it.
Project PW -11 -002 Page 11
Rev 2/03/2010
b. The Contractor's insurance shall not be cancelled or reduced as to coverage by either party,
except after forty-five (45) days prior written notice by certified mail, return receipt requested,
has been given to the City.
4. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VI.
5. Verification of Coverage
The Contractor shall furnish the City with original certificates and a copy of the amendatory
endorsements, including but not necessarily limited to the additional insured endorsement, evidencing
the Automobile Liability and Commercial General Liability insurance of the Contractor before
commencement of the work. Before any exposure to loss may occur, the Contractor shall file with the
City a copy of the Builders Risk insurance policy that includes all applicable conditions, exclusions,
definitions, terms and endorsements related to this project.
6. Contractor's Insurance For Other Losses
The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any
tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by
the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary
structures, scaffolding and protective fences.
7. Waiver of Subrogation
The Contractor and the City waive all rights against each other, any of their Subcontractors,
Subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to
the extent covered by Builders Risk insurance or other property insurance obtain pursuant to the
Insurance Requirements Section of this Contract or other property insurance applicable to the work. The
policies shall provide such waivers by endorsement or otherwise.
Project PW -11 -002 Page 12
Rev 2/03/2010
City of Port Angeles
Operations Office
Public Works and Utilities Department
360- 417 -4541
See attached listing:
ATTACHMENT "C"
PREVAILING WAGE RATES
1. Washington State Prevailing Wage Rates For Public Works Contracts Journey Level and Apprentices,
Clallam County, effective 02/14/2011.
2. To access applicable prevailing rate(s) of wages rates for the describe work by trade, use the following
Labor and Industries website link: httn:// www. lni. wa. eov/ TradesLicensina /PrevWaee /WaeeRates /default.aso
3. A copy of the applicable prevailing wage rates can be obtain by contacting Lucy Hanley at 360 417 -4541
or by email, lhanlev@citvofna.us. A hard copy is available for viewing in person at 1703 South B Street, Port
Angeles, WA. 98363.
Project PW -11 -002 Page 13
Rev 2/03/2010
City of Port Angeles
Operations Office
Public Works and Utilities Department
360- 417 -4541
See Quotation Form Attachment:
Project PW -11 -002
ATTACHMENT "D"
Quote Form
Page 14 Rev 02/03/2010
02,-24-11;10:22
QUOTATION FORM
Railroad Avenue and Lincoln Street Overlay
PW -11 -002
The bidder hereby bids the following amounts for all work (including labor, equipment, time and
materials) required to perform the work in the Statement of Work and this package.
1 Subtotal
contractor Information:
1. Company Name:
Signed by
Title
Printed Name:
Date
Project: PW -11 -002
a7_0(rf
2. Sales Tax (8.4 C:1)
Materleis Only D
3. Total Bid
Labor Materials r On() 00
4. Bid Item "B" is an optional bld Item that must be bid, Award of bid item "B" will be at the sole
discretion of the City based on availability of funds.
5. The bidder hereby acknowledges that it has received Addenda No(s).
(Enter "N /A" if none were issued) to this Request for Quotation package.
6. The name of the bidder submitting this bid and its business phone number and address, to which
address all communications concerned with this bid and with the contract shall be sent, are listed
below. Any written notices required by the terms of an awarded contract shall be served or mailed to
the following address:
2. Address:
3. City, State, Zip Code:
4. Phone Number:
5, Contractor Registration Number:
6. UFI Number:
7. WA State Industrial Insurance Account Nurnbei:
8. WA State Employment Security Dept Number:
9. State Excise Tax Registration Number;
The bidder represents that it is qualified and possesses sufficient skills and the necessary capabilities
to perform the services se rth In t Cxitct.
Wt'
Pro 1e.4- eie
P uy
-gq- 2011
Pe. 80k
r e6 gf36--
360 qS, `7303
601 1
(,o 1p 7
Page 2
4524972 2/ 2