Contract Title: HVAC On -Call Services Project Number: PK -11 -027
THIS CONTRACT is entered into the date last below written between the CITY OF PORT ANGELES, WASHINGTON
"CITY AND Beauettes Air Flo Heatina Co. "CONTRACTOR
1. WORK BY CONTRACTOR
The Contractor shall perform the work as described in Attachment "A" (Attachment "A" may include Contractor's
Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents)
which is attached hereto and by this reference is incorporated herein.
2. TERM OF CONTRACT
All work under this Contract is to be completed as indicated (check one):
All work under this Contract is to be completed by this date:
All work under this Contract is to be completed 30 days from the Notice to Proceed. No work is
to be performed prior to written Notice to Proceed by the City.
The performance period under this Contract commences 7 calendar days after notice to proceed
and ends 365 days thereafter or after contract award.
3. PAYMENT
A. The City shall pay the Contractor for the work performed under this contract (check one):
El
El
The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance
with and as described in the Attachment "A
The Contractor shall provide and bear the expense of all equipment, work and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing
the work provided for in this contract and every part thereof; except as are mentioned in the
specifications to be furnished by the City of Port Angeles.
B. The Contractor shall maintain time and expense records, which may be requested by the City. The contractor
shall submit invoices to the City for payment for work performed. All invoices must reference the City's contract
number. Invoices shall be in a format acceptable to the City.
C. The City shall pay all invoices from the Contractor by mailing a City warrant within 30 days of receipt of a
properly completed invoice.
D. All records and accounts pertaining to this Contract are to be kept available for inspections by representatives
of the City for a period of three (3) years after final payment. Copies shall be made available to the City upon
request.
Project PK -11 -027
City of Port Angeles
Public Works Utilities Dept.
Operations Office
1703 South B Street
Port Angeles WA 98362
Tel: 360 -417 -4541
Fax: 360 452 -4972
City of Port Angeles
Record #000222
LIMITED PUBLIC WORKS PROCESS
Request for Quotation
Contract
Force Account Time and material, not to exceed: $25.000.00
Force Account Time and actual expenses incurred, not to exceed:
Force Account Unit prices set forth in the Contractor's bid or quote, not to exceed:
Firm Fixed Price set forth in Contractor bid or quote in the amount of:
Page 1 Rev. 8/30/2011
E. If during the course of the Contract, the work rendered does not meet the requirements set forth in the
Contract, the Contractor shall correct or modify the required work to comply with the requirements of this
Contract. The City shall have the right to withhold payment for such work until it meets the requirements of the
Contract Documents.
4. RESPONSIBILITY OF CONTRACTOR
A. Safety. Contractor shall take all necessary precautions for the safety of employees on the work site and shall
comply with all applicable provisions of federal, state and local regulations, ordinances and codes. Contractor
shall erect and properly maintain, at all times, as required by the conditions and progress of the work, all
necessary safeguards for the protection of workers and the public and shall post danger signs warning against
known or unusual hazards.
B. Correction of Defects. Contractor shall be responsible for correcting all defects in workmanship and /or
materials discovered within one year after acceptance of this work. When corrections of defects are made,
Contractor shall be responsible for correcting all defects in workmanship and /or materials in the corrected work
for one year after acceptance of the corrections by the City. The Contractor shall start work to remedy such
defects within seven (7) days of mailing notice of discovery thereof by City and shall complete such work within a
reasonable time. In emergencies where damage may result from delay or where loss of service may result, such
corrections may be made by the City, in which case the cost shall be borne by the Contractor. In the event the
Contractor does not accomplish corrections at the time specified, the work will be otherwise accomplished and
the cost of same shall be paid by the Contractor.
C. Warranty. Contractor shall be liable for any costs, losses, expenses or damages including consequential
damages suffered by the City resulting from defects in the Contractors work including, but not limited to, cost of
materials and labor expended by the City in making emergency repairs and cost of engineering, inspection and
supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be made
against the City as a result of any defective work and the Contractor shall defend any such claims at its own
expense. Where materials or procedures are not specified in the Contract Document, the City will rely on the
professional judgment of the Contractor to make appropriate selections.
D. Nondiscrimination /Affirmative Action. Contractor agrees not to discriminate against any employee or applicant
for employment or any other persons in the performance of this Contract because of race, creed, color, national
origin, marital status, sex, age or handicap, or other circumstances as may be defined by federal, state or local
law or ordinance, except for a bona fide occupational qualification. Contractor agrees to post in conspicuous
places, available to employees and applicants for employment, notices to be provided by Contractor setting forth
the provisions of the nondiscrimination clause.
E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work or
services required by the Contractor under this Contract, shall be considered employees of the Contractor only and
not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf of said
employees, while so engaged, and all claims made by a third party as consequence of any negligent act or
omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or
rendered herein, shall not be the obligation of the City.
5. COMPLIANCE WITH LAWS
The Contractor shall comply with all federal, state and local laws and regulations applicable to the work done
under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of a material
provision of this Contract and shall be grounds for cancellation, termination or suspension of the Contract by the
City, in whole or in part, and may result in ineligibility for further work for the City.
6. TERMINATION OF CONTRACT
A. This Contract shall terminate upon satisfactory completion of the work described in Attachment "A" and final
payment by the City.
B. The City may terminate the Contract and take possession of the premises and all materials thereon and finish
the work by whatever methods it may deem expedient, by giving 10 days written notice to the
Project PK -11 -027 Page 2
Rev. 8/30/2011
Contractor, upon the occurrence of any one or more of the events hereafter specified.
1. The Contractor makes a general assignment for the benefit of its creditors.
2. A receiver is appointed as a result of the insolvency of the Contractor.
3. The Contractor persistently or repeatedly refuses or fails to complete the work required herein.
4. Contractor fails to make prompt payment to subcontractors for material or labor.
5. Contractor persistently disregards federal, state or local regulations and ordinances.
6. Contractor persistently disregards instructions of the Contract Administrator, or otherwise
substantially violates the terms of this Contract.
7. The City determines that sufficient operating funds are not available to fund completion of the work
contracted for.
C. In the event this Contract is terminated by the City, Contractor shall not be entitled to receive any further
amounts due under this Contract until the work specified in Attachment "A" is satisfactorily completed, as
scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under this
Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by the City or
which may be sustained by reason of such refusal, neglect, failure or discontinuance of employment, such excess
shall be paid by the City to the Contractor. If the City's expense and damages exceed the unpaid balance,
Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to
the City. Such expense and damages shall include all legal costs incurred by the City to protect the rights and
interests of the City under the Contract, provided such legal costs shall be reasonable.
7. OWNERSHIP OF DOCUMENTS
A. On payment to the Contractor by the City of all compensation due under this Contract, all finished or
unfinished documents and material prepared by the Contractor with funds paid by the City under this
Contract shall become the property of the City and shall be forwarded to the City upon its request.
B. Any records, reports, information, data or other documents or materials given to or prepared or assembled by
the Contractor under this Contract will be kept confidential and shall not be made available to any individual or
organization by the Contractor without prior written approval of the City or by court order.
8. CLAIMS
Any claim against the City for damages, expenses, costs or extras arising out of the performance of this
Contract must be made in writing to the City within thirty days after the discovery of such damage, expense or
Toss, and in no event later than the time of approval by the City for final payment. Contractor, upon making
application for final payment, shall be deemed to have waived its right to claim for any other damages for which
application has not been made, unless such claim for final payment includes notice of additional claim and fully
describes such claim.
9. GENERAL ADMINISTRATION AND MANAGEMENT
The Director of the Public Works and Utilities Department or his /her designee shall have primary responsibility for
the City under this Contract and shall oversee and approve all work to be performed, coordinate communications,
and review and approve all invoices, under this Contract.
10. HOLD HARMLESS
A. The Contractor shall protect, defend, indemnify and save harmless the City, its officers, employees and agents
from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting from the
negligent acts or omissions of the Contractor. The Contractor agrees that its obligations under this subparagraph
extend to any claim, demand, and /or cause of action brought by, or on behalf of, any of its employees or agents.
For this purpose, the Contractor, by mutual negotiation, hereby waives, as respects the City only, any immunity
that would otherwise be available against such claims under the industrial insurance provision of Title 51 RCW. In
the event the City obtains any judgment or award, and /or incurs any cost arising therefrom including attorneys'
fees to enforce the provisions of this article, all such fees, expenses, and costs shall be recoverable form the
Contractor.
Project PK -11 -027
Page 3 Rev 8/30/2011
B. The City shall protect, defend, indemnify and save harmless the Contractor, its officers, employees and agents
from any and all costs, claims, judgments or awards of damages, arising out of or in any way resulting from the
negligent acts or omissions of the City. The City agrees that its obligations under this subparagraph extend to any
claim, demand, and /or cause of action brought by, or on behalf of, any of its employees or agents. For this
purpose, the City, by mutual negotiation, hereby waives, as respects the Contractor only, any immunity that
would otherwise be available against such claims under the industrial insurance provision of Title 51 RCW. In the
event the Contractor obtains any judgment or award, and /or incurs any cost arising therefrom including
attorneys' fees to enforce the provisions of this article, all such fees, expenses, and costs shall be recoverable
from the City.
11. INSURANCE
The Contractor shall maintain insurance as set forth in Attachment B.
12. PREVAILING WAGE
This Contract is subject to the requirements of Chapter 39.12 RCW, and as it may be amended, relating to
prevailing wages. On Public Works projects, funded in part or in whole with Federal funds, Federal wages laws
and regulations shall also be applicable. NO WORKER, LABORER OR MECHANIC EMPLOYED IN THE
PERFORMANCE OF ANY PART OF THIS CONTRACT SHALL BE PAID LESS THAN THE PREVAILING RATE OF WAGE
as determined by the Industrial Statistician of the Department of Labor and Industries for the State of
Washington. The schedule of prevailing wage rates for this Contract is made a part of this contract as though
fully set forth herein.
Prior to making any payment under this Contract, the City must receive an approved copy of the "Statement of
Intent to Pay Prevailing Wages on Public Works Contracts" from the Department of Labor and Industries.
It is the Contractor's responsibility to obtain and file the "Statement of Intent to pay Prevailing Wage The
Contractor shall be responsible for all filing fees. Each invoice shall include a signed statement that prevailing
wages have been paid by the Contractor and all subcontractors. Following the final acceptance of services
rendered, Contractor shall submit an "Affidavit of Wages Paid
For a contract award or an on -call contract work order under $2,500, and in accordance with RCW 39.12.040(2),
the contractor or subcontractor is authorized to submit a combined Statement Of Intent To Pay Prevailing Wages
Affidavit Of Wages directly to the City of Port Angeles at final invoicing. Submission shall be made on the form
developed by the Washington State Department of Labor and Industries and available from the City of Port
Angeles Public Works and Utilities Department.
In case any dispute arises as to what are the prevailing rates of wages for a specific trade, craft or occupation
and such dispute cannot be adjusted by the parties in interest, including labor and management representatives,
the matter shall be referred for arbitration to the Director of the Department of Labor and Industries, and his
decision shall be final, conclusive, and binding on all parties involved in the dispute.
13. INTERPRETATION AND VENUE
This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The
venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington.
14. BRANDS OR EQUAL
When a special "brand or equal" is named it shall be construed solely for the purpose of indicating the standards
of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered,
provided Contractor specifies the brand and model and submits descriptive literature when available. Any bid
containing a brand which is not of equal quality, performance, or use specified must be represented as an
alternate and not as an equal, and failure to do so shall be sufficient reason to disregard the bid.
15. INSPECTION AND REJECTION
All goods, services, work, or materials purchased herein are subject to inspection and to approval by the City. Any
rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specifications
of this order, whether held by the City or returned, will be at Contractor's risk and expense.
Project PK -11 -027
Page 4 Rev 8/30/2011
16. SUBLETTING OR ASSIGNING OF CONTRACTS
Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from
this Contract without the express prior written consent of the other.
17. INDEPENDENT CONTRACTOR
The Contractor is and shall be at all times during the term of this Contract an independent contractor and not
an employee of the City.
18. EXTENT OF CONTRACT /MODIFICATION
This Contract, together with the attachments and /or addenda, represents the entire and integrated Contract
between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written
or oral. This contract may be amended, modified or added to only by written instrument properly signed by both
parties hereto.
19. SUBCONTRACTOR RESPONSIBILITY
A. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require
each of its subcontractors to include substantially the same language of this section in each of their subcontracts,
adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to
all subcontractors regardless of tier.
B. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets
the following bidder responsibility criteria:
At the time of subcontract bid submittal, have a certificate of registration in compliance with chapter
18.27 RCW;
Have a current state unified business identifier number;
If applicable, have:
Industrial insurance coverage for the subcontractor's employees working in Washington as required
in Title 51 RCW;
An employment security department number as required in Tile 50 RCW; and
A state excise tax registration number as required in Tile 82 RCW;
An electrical contractor license, if required by Chapter 19.28 RCW;
An elevator contract license, if required by Chapter 70.87 RCW.
Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3).
Project PK -11 -027 Page 5
Rev 8/30/2011
IN WITNESS WHEREOF, the parties have executed this Contract as of 10a 2011.
BEQUE S AIR FLO HEATING CO. CITY OF PORT ANGELES
By: By: 7-.
Printed Name: °t 1 2 .�c'soe i Printed Name: lit P_YiS
Title: CPr►crK, I /'1 t- Title: CA` V Mar),
lJ
Address: 0\1 was+ Co,
City: Se 4 0 "."-1
Tax ID ro -3 /7 "76
Phone Number: Z60 3- 310 1
Project PK 11 027 Page 6
Purchase Order 117n n in hv01[ 2s
Rev 8/30/2011
City of Port Angeles
Operations Office
Public Works and Utilities Department
360- 417 -4541
ATTACHMENT "A"
WORK BY CONTRACTOR
The contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the project
described below. Unless otherwise provided for in the Statement of Work, the Contractor will be responsible for
obtaining and paying for any and all permits required for this work.
STATEMENT OF WORK
The Contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the
following project:
GENERAL REQUIREMENTS WORK SPECIFICATIONS
1. This is a time and material contract under the City Manager's contracting authority of $25,000 for the
maintenance, alteration, repair, and emergency servicing of HVAC infrastructure for the City of Port Angeles's
Buildings/Facilities. The maximum dollar value including all orders or call -outs shall not exceed $25,000.
2. The performance period shall be one year from the date of award of the contract. However, the contract may be
closed earlier by the City's designated contracting agent if the total value of all work orders are within $500 of the
not to exceed amount of $25,000 and the work orders are complete.
3. The City wishes to retain a contractor that is a state licensed Heating, Ventilation, and Air Conditioning
(HVAC) firm(s) (no limited licenses) to provide servicing and repair of HVAC systems for the City of Port
Angeles's buildings and facilities. The Contractor(s) is to have sufficient staff to be available on an "on call"
basis, and which will respond, as requested, by the Public Works and Utilities Department. Work will be ordered
through the Operations Office of the Public Works and Utilities Department and may occur throughout the City's
infrastructure and facilities including those belonging to Public Works, Fire Department, Police Department,
Recreation, and City Hall. Much of the work under this contract will be call -outs to service malfunctioning
systems, where the contractor will need to investigate and determine the cause of the malfunction, and to effect
repairs.
4. The Contractor(s) shall be prepared to furnish all tools, materials, and /or equipment necessary to perform the
necessary work. The work may involve working at heights of up to forty feet (40') both on the interior and
exterior of buildings, as well as other outside facilities and the Contractor shall have its own inventory of adequate
ladders, staging and either own or be immediately able to obtain and utilize aerial lifting devices to do the work
independent of the City.
5. The services of the Contractor may be required at any time. The Contractor shall have adequate staff available
to respond to any request(s) within a reasonable time, i.e. the next business day or as may mutually be agreed.
6. The Contractor must ensure that all work is in compliance with laws and rules with a designated person holding
an electrical administrators certificate from the State of Washington with work performed by HVAC technicians
and trainees with appropriate State of Washington certificates. All work will be according to all applicable codes
and following the best standards of the trade.
7. On-call work will be assigned as "Call- outs" against this contract. Call -outs will normally be made in writing.
A sample Call -out is included in Attachment "A Emergency call -outs will normally be initiated verbally by the
Superintendent, Streets and Parks Maintenance Division, Public Works and Utilities Department, or designee, and
will be followed the next working day in writing using the call -out form.
8. The materials required for any work may be purchased by, or through the City, or when approved by the
authorized City staff, materials can be supplied by the Contractor on a cost plus basis as has been specified by the
applicant in his bid pricing form.
Project PK -11 -027
Page 7 Rev. 8/30/2011
9. All work shall be executed in strict accordance with the latest edition of the following standards and
codes and all local ordinances and regulations, and shall meet industry standards. The Contractor is
required to obtain all permits required by City of Port Angeles municipal codes and the current adopted
codes:
1. International Building Code (IBC)
2. International Residential Code (IRC)
3. Uniform Plumbing Code (UPC)
4. International Fuel and Gas Code (IFGC)
5. International Mechanical Code (IMC)
6. Washington State Energy Code (WSEC)
7. Washington State Ventilation And Indoor Air Quality Code (VIAQ) 8. ANSI 117 (Ada Accessibility
Code)
9. International Fire Code (IFC)
10. National Electrical Code (NEC)
11. Underwriters Laboratories (UL)
12. City of Port Angeles Municipal Code
10. Standard manufacturer warranties for parts or equipment shall be obtained in the name of the City of
Port Angeles and shall be submitted to the City prior to final payment on any work order.
11. All waste material generated by the Contractor's staff shall be removed daily from the work site and the area
left clean and upon completion of work. Any equipment or building structure damaged by the Contractor's staff
shall be repaired or replaced to the satisfaction of its owner.
12. The Contractor's staff shall erect, and maintain at all times, any and all safeguards necessary for the protection
of life and property of the City and its staff, their workers as well as all pedestrian and vehicular traffic.
13. With the exception of emergency call -outs, work shall not commence earlier than 7:00 A.M., nor extend
beyond 5:00 P.M., without the expressed approval of the Superintendent, Streets and Parks Maintenance Division,
Public Works and Utilities Department, or designee. No work shall be performed on Saturdays, Sundays or
holidays unless authorized by the Superintendent, or designee.
EMERGENCY RESPONSE TIME AND PAYMENT OF EMERGENCY RATES
During emergency situations, as determined by the Superintendent, Streets and Parks Maintenance
Division, Public Works and Utilities Department, or designee, the Contractor is required to provide
service no later than 60 minutes from the time of notification of the existence of an emergency condition.
The Contractor shall be required to maintain a 24 hour a day, 7 days a week, telephone /paging capability
for call -outs and inform the Deputy Director for Operations of the Public Works and Utilities Department
telephone of the current number. Under such conditions, the emergency rates will apply to personnel as
numerated by the Contractor in their application. These rates will not be paid to any given crew for more
than eight (8) consecutive hours. Subsequent to that time, standard rates will apply for the duration of
work by the Contractor unless otherwise approved by the Superintendent, Streets and Parks Maintenance
Division, Public Works and Utilities Department, or designee.
ADMINISTRATIVE
1. The Contractor will be required to submit separate itemized invoices to the Superintendent, Streets
and Parks Maintenance Division, Public Works and Utilities Department, or designee, for the work that
is performed. Invoices must: a) state site location; b) list City staff person requesting the work; c)
indicate number and type of crew provided and hours worked by each; and, d) any City authorized
"cost- plus" materials purchased and used. Second invoices for a project must be marked "duplicate
Project PK -11 -027 Page 8
Rev 8/30/2011
2. The City reserves the right to require lien waivers for labor and /or material, for and in the amount of
each invoice, guaranteeing payment in full for all labor and materials used or required in connection
with any work ensuing from the contract.
3. The City reserves the right to require a lump -sum price for certain, larger, projects instead of the
agreed hourly rates. The Contractor(s) may decline the opportunity if it so elects. The City further
reserves the right to obtain and utilize the services of other contactors to perform certain projects.
4. It is the custom of the City of Port Angeles, to pay its bills 30 days after completion and acceptance
of the work, and the receipt of properly documented invoices for that work covered under the contract.
In submitting applications under these specifications, applicants should take into account all discounts,
both trade and time, allowed in accordance with this payment policy and quote a net price.
5. Pursuant to Port Angeles City Code, the City reserves the right to cancel the contract immediately for
cause. The City reserves the right to cancel the contract for its convenience on thirty days prior written
notice, with the City responsible for payment only for supplies, materials and /or labor provided or
amounts expended or incurred in reliance thereon prior to the effective date of such notice.
6. The City reserves the right to waive any informalities in bids, to accept any bid or portions thereof
(bidders are advised to note this and quote accordingly) and to reject any or all bids should it be deemed
for the best interest of the City to do so. The City reserves the right to substantiate the bidder's
qualifications, capability to perform, availability, past performance record and to verify that the proposer is
current in its obligations to the City.
Project PK -11 -027 Page 9
Rev 8/30/2011
CALL -OUT
CONTRACT: PK -11 -027 ON -CALL HVAC Repair Services
Call -out Number: PK -11 -027
Title:
Location of Work:
Work shall be performed in the Not to Exceed (NTE) amount of:
Contractor shall not exceed this amount without written approval of the City's Authorized Agent.
Service Tasks:
Performance Period. For the following two performance period paragraphs, only the paragraph with
the checked box applies:
The Contractor shall commence work within working days of a Notice to Proceed, and said
work shall be physically completed within calendar days.
OR
The Contractor shall complete all work within calendar days from the date of issuance of
this Work Order.
City of Port Angeles Authorizing Agent Date of Issuance
Contractor Date Received
Project PK -11 -027 Page 10
Rev. 8/30/2011
City of Port Angeles
Operations Office
Public Works and Utilities Department
360- 417 -4541
INSURANCE INDEMNITY REQUIREMENTS FOR
CONSTRUCTION AND SERVICE CONTRACTS
Includes construction and remodeling, janitorial service, tree maintenance, road maintenance, painting,
electrical work, plumbing, movers, and on site maintenance agreements.
Indemnification Hold Harmless
The Contractor shall defend, indemnify and hold the City, its officers, officials, employees and
volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees,
arising out of or in connection with the performance of this Agreement, except for injuries and damages
caused by the sole negligence of the City.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115.
then, in the event of liability for damages arising out of bodily injury to persons or damages to property
caused by or resulting from the concurrent negligence of the Contractor and the City, its officers,
officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the
Contractor's negligence. It is further specifically and expressly understood that the indemnification
provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51
RCW. solely for the purposes of this indemnification. This waiver has been mutually negotiated by the
parties. The provisions of this section shall survive the expiration or termination of this Agreement.
Insurance
ATTACHMENT "B"
INSURANCE
The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims
for injuries to persons or damage to property which may arise from or in connection with the
performance of the work hereunder by the Contractor, their agents, representatives, employees or
subcontractors.
No Limitation
Contractor's maintenance of insurance, its scope of coverage and limits as required herein shall not be
construed to limit the liability of the Contractor to the coverage provided by such insurance, or
otherwise limit the City's recourse to any remedy available at law or in equity.
Minimum Scope of Insurance
Contractor shall obtain insurance of the types described below:
1. Automobile Liability insurance covering all owned, non owned, hired and leased vehicles.
Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form
providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide
contractual liability coverage.
2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and
shall cover liability arising from premises, operations, independent contractors, products
completed operations, stop gap liability, personal injury and advertising injury, and liability
assumed under an insured contract. The Commercial General Liability insurance shall be
Project PK -11 -027
Page 11 Rev 8/30/2011
endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85 or an
equivalent endorsement. There shall be no endorsement or modification of the Commercial
General Liability Insurance for liability arising from explosion, collapse or underground property
damage. The City shall be named as an insured under the Contractor's Commercial General
Liability insurance policy with respect to the work performed for the City using ISO Additional
Insured endorsement CG 20 10 10 01 and Additional Insured Completed Operations
endorsement CG 20 37 10 01 or substitute endorsements providing equivalent coverage.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of
Washington.
Minimum Amounts of Insurance
Contractor shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined single limit for bodily injury and
property damage of $1,000,000 per accident.
2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each
occurrence, $2,000,000 general aggregate and $2,000,000 products completed operations
aggregate limit.
Other Insurance Provision
The Contractor's Automobile Liability and Commercial General Liability insurance policies are to
contain, or be endorsed to contain that they shall be primary insurance as respect the City. Any
insurance, self insurance, or insurance pool coverage maintained by the City shall be excess of the
Contractor's insurance and shall not contribute with it.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less than A: VII.
E. Verification of Coverage
Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements,
including but not necessarily limited to the additional insured endorsement, evidencing the insurance
requirements of the Contractor before commencement of the work.
F. Subcontractors
The Contractor shall have sole responsibility for determining the insurance coverage and limits required,
if any, to be obtained by subcontractors, which determination shall be made in accordance with
reasonable and prudent business practices.
G. Notice of Cancellation
The Contractor shall provide the City and all Additional Insureds for this work with written notice of
any policy cancellation, within two business days of their receipt of such notice.
Project PK -11 -027
Page 12 Rev. 8/30/2011
H. Failure to Maintain Insurance
Failure on the part of the Contractor to maintain the insurance as required shall constitute a material
breach of contract, upon which the City may, after giving five business days notice to the Contractor to
correct the breach, immediately terminate the contract or, at its discretion, procure or renew such
insurance and pay any and all premiums in connection therewith, with any sums so expended to be
repaid to the City on demand, or at the sole discretion of the City, offset against funds due the
Contractor from the City.
Project PK -11 -027
Page 13 Rev 8 /30 /2011
City of Port Angeles
Operations Office
Public Works and Utilities Department
360- 417 -4541
See attached listing:
ATTACHMENT "C"
PREVAILING WAGE RATES
1. Washington State Prevailing Wage Rates For Public Works Contracts Journey Level and Apprentices,
Clallam County, effective 9/15/2011.
2. To access applicable prevailing rate(s) of wages rates for the describe work by trade, use the following Labor
and Industries website link: httn:// www. lni. wa. eov/ TradesLicensin* /PrevWaae /Wa2eRates /default.asn
3. A copy of the applicable prevailing wage rates can be obtain by contacting Lucy Hanley at 360 417 -4541 or by
email, lhanlevacitvofna.us. A hard copy is available for viewing in person at 1703 South B Street, Port Angeles,
WA. 98363.
Project PK -11 -027
Page 14 Rev 8/30/2011
City of Port Angeles
Operations Office
Public Works and Utilities Department
360- 417 -4541
Quotation Form and Addenda Attachments:
Project PK -11 -027
ATTACHMENT "D"
Quote Form Addenda
Page 15 Rev 8/30/2011
Supplemental Information Form
HVAC On -Call Services
PK 11 -427
1. The bidder hereby acknowledges that it has received Addenda No(s). /1/4
(Enter "N /A" if none were issued) to this Request for Quotation package.
3. Contractor Information:
1. Company Name:
2. Address:
3. City, State, Zip Code:
4. Phone Number:
5. Contractor Registration Number:
6. UBI Number:
7. WA State Industrial Insurance Account Number:
8. WA State Employment Security Dept Number:
Signed by
Title
Printed Name:
Date
Project: PK 11 027
vet (1 t-
elaSt1
j- /6 -Zo
uS 4; f% Svc
i
,x.2,1 IAJc.N4-
seyul,v AMY 983d&
(360) 683 -3q o d
6o0 3 (17- 761
2s 4. 1 oa
y 00 6
9. State Excise Tax Registration Number: 60 o -3&17-761
Co,
2. The name of the bidder submitting this bid and its business phone number and address, to which
address all communications concerned with this bid and with the contract shall be sent, are listed
below. Any written notices required by the terms of an awarded contract shall be served or mailed to
the following address:
The bidder represents t -t it is qualified and possesses sufficient skills and the necessary capabilities
to perform the service set orth in this Contract.
Page 4 Rev 8/30/2011
co
Project Title: HVAC On -Call Services Project Number: PK -1 I -027
The bidder hereby bids the following amounts for all work (including tabor, equipment, time
and materials) required to perform the work in the Statement of Work and this package.
Quoted Rates in Line Items 1 through 6 shall include all overhead, profit, etc. Call -outs will be
paid based on the quoted rates in this form.
1. SERVICE CALL RATE
2. Material, which the contractor may require to do the work, and which is not supplied by
the City, will be charged,
AT COST PLUS
3. Permits Other Governmental Fees which the contractor is required to obtain or pay to
perform the work, and which is not supplied by the City, will be charged,
AT COST PLUS 75 (with verifiable receipts and invoices)
4. PREVAILING WAGE FILING FEES
(LNI fee is $40.00 /form)
Project: PK -11 -027
QUOTATION FORM
Routine 1 J So Od /HR
EMERGENCY 1 Z. 1 S'; )4 /HR
7 (with verifiable receipts and invoices)
I go, o0
/FORM
Page 3 Rev 8/30/2011
PW- 407_13 (rev 09/18/02]
ADDENDUM NO. 1
TO
PROJECT MANUAL
FOR
HVAC ON -CALL SERVICES
PROJECT NO. PK 11 -027
NOTICE TO PROSPECTIVE BIDDERS
September 23, 2011
NOTICE IS HEREBY GIVEN that the instructions and requirements of the subject bid are amended
as follows:
Statement of Work, Attachment "A section Part 2 Excution is revised to include the
following:
1. The section on Part 2 Execution is to be deleted from the Statement of Work under
Attachment "A This section does not pertain to the work needed.
The section to be deleted:
PART 2 EXECUTION
2.1 RECORDS
A.PALO will provide Contractor with a list of transformers to be sampled, and their locations.
B.Contractor shall keep accurate records of each transformer tested and laboratory results.
2.2 PROCEDURE
A. Customer outages will be necessary for the majority of testing locations. Contractor shall
notify customers 48 hours in advance of planned outage. Outages shall occur only during
normal business hours. Coordinate with PALO.
B. Samples may be drawn by removing pressure relief valve. At some locations, it may be
necessary to make a hole on the transformer tank above the oil level using a Hilti DX -451m
or equal.
C. Verify transformer is under positive pressure before drawing sample to avoid drawing air into
the transformer.
D. When sampling transformers with no PCB labels, treat the unit as having contaminated fluid.
Since oil may contain PCB's, do not allow any oil drawn to spill on ground. Personnel shall
wear latex gloves or other protective equipment to avoid exposure.
E. Samples shall be transferred to individual sample bottles, to be provided by the Contractor.
Clean any spillage from bottle exteriors.
Page 1 of 2
F. Upon completion of sampling, reinstall pressure relief valve, or plug hole by coating with a
silicon sealer and plugging with a coated rivet, provided by PALO. Contractor may use
alternate methods if approved in advance by PALO.
G. Upon receiving laboratory test results, Contractor shall field label each transformer with PCB
warning labels or "No PCB" labels, as appropriate. Labels shall be installed on interior of pad
mounted transformer compartments, or on exterior of overhead transformers to be visible
from the ground.
2. The Bid Opening Date remains unchanged. The bid opening date is Thursday, September 29,
2011 at 2:00 PM.
This addendum must be acknowledged in the space provided on the Bid Form in the Project
Manual that is submitted to the City. Failure to do so may result in the proposal being rejected as
non responsive.
andall Brackett, P.E.
Deputy Director of Operations
PW- 407_13 [rev 09/18/02]
Page 2of2