HomeMy WebLinkAbout2435 Samara Dr - Technical TECHNICAL
Permit p$/ 1044
Address 205 Sarnqo Or' ✓2
Project description
Date the permit was finaled C4Di red-
Number of technical pages 41
LINDBERAMITH
ARCHI C T S
21)4 l %%MOM
atIrstaS 4 ct i
319 s. peabody, suite b, port angeles, wa 98362
360.452.6116 fax 360.452.7064
Pro'ect: 1 rtvbk...) 1,tor Proect No. 3
:it I tiN
Subject: rio,,JA, By: 4.0 011
Date ta" V) CA '141, Sheet of If, 0
''34P=1"` L1-1 4 37tit041.:66 0 STPAA 4
L
1 p cwv, P5 4o n)pb4
gNoo-) 2 0"
I
-4
1
LINDBER KITH
A R C H I- 1 E C T S
319 S. Peabody, Suite B., Port Angeles, WA 98362
360.452.6116 fax 360.452.7064
contact( lindarch.com www.lindarch.com
Project: 7' Project No.
Subject: Lie By:
Date: l� Sheet of
SHEAR WALL SUMMARY
W L H V V/L SW VH- WL /2 POST HOLD DOWN
2 325 "71
17 13 5•77)5B, 2Z m 7 ate, 3 0;
3 2 4, 41 24) 51
4 1,s 12. 50o 11 i for *7
8 '2 1 �1
4 1.6 /2.15
I/ ALLOFIT/FIRMINFO/FORMS /SHEARWAL
r
A. PL -YWOOD OR O.S.B. SHEAR WALLS
1. MAXIMUM SHEAR 250 P.L.F.
USE h" SHEATING ONE SIDE OF WALL. NAIL ALL EDGES WITH 8d NAILS AT 6"
O.C. FOR FRAMING, USE DF NO.2. PROVIDE W DIAMETER ANCHOR BOLTS AT
32" O.C. MAXIMUM SPACING AT THE FOUNDATION. FOR TIE DOWNS AT EACH
END OF THE WALL, SEE FRAMING /SHEAR WALL PLANS.
2. MAXIMUM SHEAR 315 P.L.F.
USE W SHEATING ONE SIDE OF WALL NAIL ALL EDGES WITH 8d NAILS AT 5"
0.C. FOR FRAMING, USE DF NO.2. PROVIDE W DIAMETER ANCHOR BOLTS AT
32" 0.C. MAXIMUM SPACING AT THE FOUNDATION. FOR TIE DOWNS AT EACH
END OF THE WALL, SEE FRAMING /SHEAR WALL PLANS.
3. MAXIMUM SHEAR 375 P.L.F.
USE SHEATING ONE SIDE OF WALL NAIL ALL EDGES WITH 8d NAILS AT 4"
O.C. FOR FRAMING, USE 3X DF NO.2. PROVIDE DIAMETER ANCHOR BOLTS
AT 24" O.C. MAXIMUM SPACING AT THE FOUNDATION. FOR TIE DOWNS AT
EACH END OF THE WALL, SEE FRAMING /SHEAR WALL PLANS.
4. MAXIMUM SHEAR 490 P.L.F.
USE SHEATING ONE SIDE OF WALL. NAIL ALL EDGES WITH 8d NAILS AT 3"
0.C. FOR FRAMING, USE 3X DF N0.2. DOUBLE BOTTOM PLATES ARE
REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS. PROVIDE 5/8"
DIAMETER ANCHOR BOLTS AT 32" 0.C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
5. MAXIMUM SHEAR 560 P.L.F.
USE IA" SHEATING ONE SIDE OF WALL. NAIL ALL EDGES WITH 10d NAILS AT 3"
0.C. -FOR FRAMING, USE 3X DF N0.2. DOUBLE BOTTOM PLATES ARE
REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS. PROVIDE 5/8"
DIAMETER ANCHOR BOLTS AT 24" O:C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
6. MAXIMUM SHEAR 685 P.LF.
USE l" SHEATING ONE SIDE OF WALL. NAIL ALL EDGES WITH 10d NAILS AT
2 1/2" 0.C. STAGGERED. FOR FRAMING, USE 3X DF N0.2. DOUBLE BOTTOM
PLATES ARE REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS.
PROVIDE 5/8" DIAMETER ANCHOR BOLTS AT 20" 0.C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
7. MAXIMUM SHEAR 770 P.L.F.
USE SHEATING ONE SIDE OF WALL. NAIL ALL EDGES WITH 10d NAILS AT
2" O.C. STAGGERED. FOR FRAMING, USE 3X DF N0.2. DOUBLE BOTTOM.
PLATES ARE REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS.
PROVIDE 5/8" DIAMETER ANCHOR BOLTS AT 18" 0.C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE-WALL, SEE
FRAMING /SHEAR WALL PLANS.
e f
8. MAXIMUM SHEAR 870 P.L.F.
USE' SHEATING BOTH SIDE OF WALL. NAIL ALL EDGES WITH 8d NAILS AT
3 1/2" O.C. FOR FRAMING, USE 3X DF NO.2. DOUBLE BOTTOM PLATES ARE
REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS. PROVIDE 3/4"
DIAMETER ANCHOR BOLTS AT 20" O.C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
9. MAXIMUM SHEAR 980 P.L.F.
USE /2 SHEATING BOTH SIDE OF WALL. NAIL ALL EDGES WITH 8d NAILS AT
3" O.C. FOR FRAMING, USE 3X DF NO.2. DOUBLE BOTTOM PLATES ARE
REQUIRED, BOLT THROUGH BOTH PLATESWITH ANCHOR BOLTS. PROVIDE 3/4"
DIAMETER ANCHOR BOLTS AT 18" O.C. MAXIMUM SPACING AT THE
FOUNDATION: FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
10. MAXIMUM SHEAR 1,200 P.L.F.
USE W SHEATING BOTH SIDE OF WALL. NAIL ALL EDGES WITH 10d NAILS AT
3" O.C. STAGGERED. FOR FRAMING, USE 3X DF NO.2. DOUBLE BOTTOM
PLATES ARE REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS.
PROVIDE3 /4" DIAMETER ANCHOR BOLTS AT 14" O.C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
11. MAXIMUM SHEAR 1,540 P.L.F.
USE W SHEATING BOTH SIDE OF WALL. NAIL ALL EDGES WITH 10d NAILS AT
2" O.C. STAGGERED. FOR FRAMING, USE 3X DF NO.2. DOUBLE BOTTOM
PLATES ARE REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS.
PROVIDE 3/4" DIAMETER ANCHOR BOLTS AT 11" O.C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
12. MAXIMUM SHEAR 1,740 P.L.F.
USE 5/8" SHEATING BOTH SIDE OF WALL. NAIL ALL EDGES WITH 10d NAILS AT
2" O.C. STAGGERED. FOR FRAMING, USE 3X DF NO.2. DOUBLE BOTTOM
PLATES ARE REQUIRED, BOLT THROUGH BOTH PLATES WITH ANCHOR BOLTS.
PROVIDE 3/4" DIAMETER ANCHOR BOLTS AT 9" O.C. MAXIMUM SPACING AT THE
FOUNDATION. FOR TIE DOWNS AT EACH END OF THE WALL, SEE
FRAMING /SHEAR WALL PLANS.
r--
;is o
men o
oi
1 Faiiiii
mplop
gate
gif ilF11 4 T
if T._,,
igigli
90 Wit-
COQ"
op I: k
1 l g i le
o
li ii!'
li li
1
111
Ai
r SU v
M SWEAR SALL 1
NUMBER 4
M
r
(p o
E
r
r SHEAR WALL
4 '�yp�'�� i.
e
1
z
mau r
0 i v
NI'BB24
IP''
J gr
o c
SALL T T
SIE4R WALL
POSER 4
E
t
p 111 1 I 1 Suite H I nnaurecr 319 South Peabody St DAi
i I�� i' «E; �srr.�eo r:
A New Residence Fo
r POrt D` Eco —Green Buil Inc.
A ,R ,r\ If a ens vs ,ro re+ es i......• 1:::::'::: I
t 4'4 VO
`4. 1.
te
4:
Id\ ui
4 0
VA. 0 IE 7 P e
I al
c 1 il I
\I\ A
et I
V 1
N't
1
r
Z 0
I.
z 0
t 0
an i
w
4
6.
te
P
4 P
al ti
P F
N 4- L---
e,,,A 7
i fi 6N eV
P
Fl
1% 4E1 A) .01j
P IL
rg niii ..„.1
I li aq
1 1 6'
i
ri
A
il
I). —14111-
1
1
u 1
0 0 4
I uki 1/)
1 '13
11..). 6
0 s' i 4t
1 r
z 0,. A
N.? 1
(Al di
V 5
if ti 0
--r-1
f.,1-4.
h
.P.:. *1,,, (F:' L t
tt,
7
0 A;
,s.
4Y
Z''. 4 Sikj 1\
Ak k t\i` I Vk t
kt kt IP fe :„0,
i,
N.. ...,.fl
I,C A
-ii
1 xi
il
0 hs.
ti\'v ,,t;
u- Sa,....;,4
v
ft k
l co' H- i
it .0,
4‘‘
te et.
t
4
Ct
it ,P0 Asi
At.'cis
F
.h--).„.... N.
Z
r
IT (4,'
i
Iii v
I
r
,ii
1
0
f '49
•,e;
i
ti:Nv
1 a AI in."
1
1 Sifillikill I
tv 't, 1 IIMMEI 1
.ce‘.
\Li iff
r -41, 1
iv,
Mom I 4‘,..,,, kk
'0
ii s 1
0111111MIJ 1
Z
I t\iv, txr
,A tft.
III 1
wir —II
1
i
4 .ammpratinimopmmillimi
ill
444
MI I
11.1111E1111M11 ,.."1:i
..e
id 4\ .s. f^.. V
k.,4•'' 61 e.
a
••,'-,\A's)
11 .6 V
41'
t
„i 0
it
t\• i, I;) `,>J
ti ,a...,...,
0 il,„ t‘ v-i
"..0.
r
Roof Beam( 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:14:33 AM
Project: ECO -GREEN LOT 23 Location: ROOF 1
Summary:
3.5 IN x 9.25 IN x 9.0 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 12.8% Controlling Factor: Section Modulus Depth Required 8.71 In
Deflections:
Dead Load: DLD= 0.08 IN
Live Load: LLD= 0.12 IN L/923
Total Load: TLD= 0.19 IN L/555
Reactions (Each End):
Live Load: LL -Rxn= 1153 LB
Dead Load: DL -Rxn= 765 LB
Total Load: TL -Rxn= 1918 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.97 IN
Beam Data:
Span: L= 9.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: U 240
Total Load Deflect. Criteria: L/ 180
Roof Loadinq:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 8.25 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 8 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 9.0 FT
Beam Uniform Live Load: wL= 256 PLF
Beam Uniform Dead Load: wD_adj= 170 PLF
Total Uniform Load: wT= 426 PLF
Properties For: #2- Mixed Southern Pine
Bendinq Stress: Fb= 925 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1170 PSI
Adjustment Factors: Cd =1.15 Cf =1.10
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controllinq Moment: M= 4315 FT -LB
4.5 ft from left support
Critical moment created by combining all dead and live loads.
Controllinq Shear: V= 1611 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 44.25 N3
S= 49.91 N3
Area (Shear): Areq= 23.35 N2
A= 32.38 N2
Moment of Inertia (Deflection): Ireq= 74.89 N4
1= 230.84 N4
f
Roof Beamf 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:15:20 AM
Project: ECO -GREEN LOT 23 Location: ROOF 2
Summary:
3.5 IN x 7.25 IN x 7.0 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 238.1% Controlling Factor: Section Modulus Depth Required 3.94 In
Deflections:
Dead Load: DLD= 0.02 IN
Live Load: LLD= 0.03 IN L/2766
Total Load: TLD= 0.05 IN.= L/1624
Reactions (Each End):
Live Load: LL -Rxn= 306 LB
Dead Load: DL -Rxn= 215 LB
Total Load: TL -Rxn= 522 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.26 IN
Beam Data:
Span: L= 7.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: U 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 6 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 7.0 FT
Beam Uniform Live Load: wL= 88 PLF
Beam Uniform Dead Load: wD_adj= 62 PLF
Total Uniform Load: wT= 149 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1050 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1208 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 913 FT -LB
3.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 438 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 9.07 N3
S= 30.66 N3
Area (Shear): Areq= 6.35 N2
A= 25.38 N2
Moment of Inertia (Deflection): Ireq= 12.32 N4
1= 111.15 N4
Roof Beam!' 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 07:16:21 AM
Project: ECO -GREEN LOT 23 Location: ROOF 3
Summary:
3.5 IN x 5.5 IN x 4.75 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 105.9% Controlling Factor: Area Depth Required 3.81 In
Deflections:
Dead Load: DLD= 0.02 IN
Live Load: LLD= 0.03 IN L/1691
Total Load: TLD= 0.06 IN L/1021
Reactions (Each End):
Live Load: LL -Rxn= 475 LB
Dead Load: DL -Rxn= 312 LB
Total Load: TL -Rxn= 787 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.40 IN
Beam Data:
Span: L= 4.75 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: U 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 6.5 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 4.75 FT
Beam Uniform Live Load: wL= 200 PLF
Beam Uniform Dead Load: wD_adj= 131 PLF
Total Uniform Load: wT= 331 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 934 FT -LB
2.375 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 645 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 8.47 N3
S= 17.65 N3
Area (Shear): Areq= 9.35 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 8.55 N4
1= 48.53 N4
Roof Beam' 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:16:50 AM
Project: ECO -GREEN LOT 23 Location: ROOF 4
Summary:
3.5 IN x 5.5 IN x 5.5 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 55.3% Controlling Factor: Section Modulus Depth Required 4.41 In
Deflections:
Dead Load: DLD= 0.04 IN
Live Load: LLD= 0.06 IN U1089
Total Load: TLD= 0.10 IN L/658
Reactions (Each End):
Live Load: LL -Rxn= 550 LB
Dead Load: DL -Rxn= 361 LB
Total Load: TL -Rxn= 911 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.46 IN
Beam Data:
Span: L= 5.5 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: U 240
Total Load Deflect. Criteria: U 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 6.5 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Lath= 5.5 FT
Beam Uniform Live Load: wL= 200 PLF
Beam Uniform Dead Load: wD_adj= 131 PLF
Total Uniform Load: wT= 331 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 1252 FT -LB
2.75 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 765 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 11.36 N3
S= 17.65 N3
Area (Shear): Areq= 11.09 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 13.28 N4
1= 48.53 N4
Roof Beam( 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 07:17:14 AM
Project: ECO -GREEN LOT 23 Location: ROOF 5
Summary:
3.5 IN x 5.5 IN x 4.25 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 135:9% Controlling Factor: Area Depth Required 3.41 In
Deflections:
Dead Load: DLD= 0.01 IN
Live Load: LLD= 0.02 IN L/2360
Total Load: TLD= 0.04 IN L/1425
Reactions (Each End):
Live Load: LL -Rxn= 425 LB
Dead Load: DL -Rxn= 279 LB
Total Load: TL -Rxn= 704 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.36 IN
Beam Data:
Span: L= 4.25 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 6.5 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 4.25 FT
Beam Uniform Live Load: wL= 200 PLF
Beam Uniform Dead Load: wD_adj= 131 PLF
Total Uniform Load: wT= 331 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 748 FT -LB
2.125 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 563 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 6.78 N3
S= 17.65 N3
Area (Shear): Areq= 8.16 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 6.13 N4
I= 48.53 N4
Roof Beamf 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:17:36 AM
Project: ECO -GREEN LOT 23 Location: ROOF 6
Summary:
3.5 IN x 5.5 IN x 2.5 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 401.3% Controlling Factor: Area Depth Required 2.01 In
Deflections:
Dead Load: DLD= 0.00 IN
Live Load: LLD= 0.00 IN L/11596
Total Load: TLD= 0.00 IN L/7003
Reactions (Each End):
Live Load: LL -Rxn= 250 LB
Dead Load: DL -Rxn= 164 LB
Total Load: TL -Rxn= 414 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.21 IN
Beam Data:
Span: L= 2.5 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: U 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 6.5 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 2.5 FT
Beam Uniform Live Load: wL= 200 PLF
Beam Uniform Dead Load: wD_adj= 131 PLF
Total Uniform Load: wT= 331 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1:00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 259 FT -LB
1.25 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 265 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 2.35 N3
S= 17.65 N3
Area (Shear): Areq= 3.84 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 1.25 N4
1= 48.53 N4
Roof Beam' 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:18:06 AM
Project: ECO -GREEN LOT 23 Location: ROOF 7
Summary:
3.5 IN x 5.5 IN x 2.5 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 1025.5% Controlling Factor: Area Depth Required 1.34 In
Deflections:
Dead Load: DLD= 0.00 IN
Live Load: LLD= 0.00 IN L/26506
Total Load: TLD= 0.00 IN L/15722
Reactions (Each End):
Live Load: LL -Rxn= 109 LB
Dead Load: DL -Rxn= 75 LB
Total Load: TL -Rxn= 184 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.09 IN
Beam Data:
Span: L= 2.5 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Lenqth: Ladj= 2.5 FT
Beam Uniform Live Load: wL= 88 PLF
Beam Uniform Dead Load: wD_adi= 60 PLF
Total Uniform Load: wT= 148 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 115 FT -LB
1.25 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 118 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 1.05 N3
S= 17.65 N3
Area (Shear): Areq= 1.71 N2
A= 19.25 N2
Moment of Inertia (Deflection): lreq= 0.56 N4
1= 48.53 N4
Roof Beam' 2000 International Building Code (97 NDS) 1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:18:29 AM
Project: ECO -GREEN LOT 23 Location: ROOF 8
Summary:
3.5 IN x 5.5 IN x 5.0 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 87.9% Controlling Factor: Section Modulus Depth Required 4.01 In
Deflections:
Dead Load: DLD= 0.03 IN
Live Load: LLD= 0.04 IN U1450
Total Load: TLD= 0.07 IN L/875
Reactions (Each End):
Live Load: LL -Rxn= 500 LB
Dead Load: DL -Rxn= 328 LB
Total Load: TL -Rxn= 828 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.42 IN
Beam Data:
Span: L= 5.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: U 240
Total Load Deflect. Criteria: U 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 6.0 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 5.0 FT
Beam Uniform Live Load: wL= 200 PLF
Beam Uniform Dead Load: wD_adj= 131 PLF
Total Uniform Load: wT= 331 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 1035 FT -LB
2.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 679 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 9.39 N3
S= 17.65 N3
Area (Shear): Areq= 9.84 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 9.98 N4
1= 48.53 N4
Roof Beam' 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:19:36 AM
Project: ECO -GREEN LOT 23 Location: ROOF 9
Summary:
3.5 IN x 5.5 IN x 5.0 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 77.0% Controlling Factor: Section Modulus Depth Required 4.13 In
Deflections:
Dead Load: DLD= 0.03 IN
Live Load: LLD= 0.04 IN L/1364
Total Load: TLD= 0.07 IN L/825
Reactions (Each End):
Live Load: LL -Rxn= 531 LB
Dead Load: DL -Rxn= 348 LB
Total Load: TL -Rxn= 879 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.44 IN
Beam Data:
Span: L= 5.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 6.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 5.0 FT
Beam Uniform Live Load: wL= 213 PLF
Beam Uniform Dead Load: wD_adj= 139 PLF
Total Uniform Load: wT= 352 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 1099 FT -LB
2.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 721 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 9.97 N3
S= 17.65 N3
Area (Shear): Areq= 10.45 N2
A= 19.25 N2
Moment of Inertia (Deflection): lreq= 10.59 N4
1= 48.53 N4
Roof Beam' 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:20:26 AM
Project: ECO -GREEN LOT 23 Location: ROOF 10
Summary:
3.125 IN x 10.5 IN x 11.0 FT 1 24F-V4 Visually Graded Western Species Dry Use
Section Adequate By: 178.0% Controlling Factor: Section Modulus Depth Required 6.7 In
Deflections:
Dead Load: DLD= 0.08 IN
Live Load: LLD= 0.11 IN L/1160
Total Load: TLD= 0.19 IN L/692
Reactions (Each End):
Live Load: LL -Rxn= 1031 LB
Dead Load: DL -Rxn= 696 LB
Total Load: TL -Rxn= 1727 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.85 IN
Camber Reqd.: C= 0.12 IN
Beam Data:
Span: L= 11.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Camber Adjustment Factor: CAF= 1.5 X DLD
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One:. TW1= 6.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 1.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 8 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adiusted Beam Length: Ladj= 11.0 FT
Beam Uniform Live Load: wL= 188 PLF
Beam Uniform Dead Load: wD_adi= 127 PLF
Total Uniform Load: wT= 314 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress:. Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2760 PS
Adjustment Factors: Cd =1.15
Fv': Fv'= 219 PS
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 4750 FT -LB
5.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 1486 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 20.65 N3
S= 57.42 N3
Area (Shear): Areq= 10.20 N2
A= 32.81 N2
Moment of Inertia (Deflection): Ireq= 78.37 N4
1= 301.46 N4
Roof Beams 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:21:02 AM
Project: ECO -GREEN LOT 23 Location: ROOF 11
Summary:
3.5 IN x 5.5 IN x 5.0 FT /#2 Mixed Southern Pine Dry Use
Section Adequate By: 389.6% Controlling Factor: Section Modulus Depth Required 2.49 In
Deflections:
Dead Load: DLD= 0.0.1 IN
Live Load: LLD= 0.02 IN L/3865
Total Load: TLD= 0.03 IN L/2281
Reactions (Each End):
Live Load: LL -Rxn= 188 LB
Dead Load: DL -Rxn= 130 LB
Total Load: TL -Rxn= 318 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.16 IN
Beam Data:
Span: L= 5.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 2.0 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 1.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladi= 5.0 FT
Beam Uniform Live Load: wL= 75 PLF
Beam Uniform Dead Load: wD_adl= 52 PLF
Total Uniform Load: wT= 127 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 397 FT -LB
2.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 261 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 3.60 N3
S= 17.65 N3
Area (Shear): Areq= 3.78 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 3.83 N4
1= 48.53 N4
Roof Beam( 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:22:00 AM
Project: ECO -GREEN LOT 23 Location: ROOF 12
Summary:
3.5 IN x 5.5 IN x 3.0 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 757.5% Controlling Factor: Area Depth Required 1.61 In
Deflections:
Dead Load: DLD= 0.00 IN
Live Load: LLD= 0.00 IN L/15339
Total Load: TLD= 0.00 IN L/9098
Reactions (Each End):
Live Load: LL -Rxn= 131 LB
Dead Load: DL -Rxn= 90 LB
Total Load: TL -Rxn= 221 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.11 IN
Beam Data:
Span: L= 3.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Roof Duration Factor: Cd= 1.15
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 3.0 FT
Beam Uniform Live Load: wL= 88 PLF
Beam Uniform Dead Load: wD_adj= 60 PLF
Total Uniform Load: wT= 148 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 166 FT -LB
1.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 155 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 1.51 N3
S= 17.65 N3
Area (Shear): Areq= 2.24 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 0.96 N4
1= 48.53 N4
Roof Beam[ 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:25:02 AM
Project: ECO -GREEN LOT 23 Location: ROOF 13
Summary:
5.125 IN x 16.5 IN x 15.0 FT 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 214.8% Controlling Factor: Section Modulus Depth Required 9.64 In
Deflections:
Dead Load: DLD= 0.09 IN
Live Load: LLD= 0.11 I N L/1679
Total Load: TLD= 0.20 IN L/903
Reactions (Each End):
Live Load: LL -Rxn= 2438 LB
Dead Load: DL -Rxn= 2093 LB
Total Load: TL -Rxn= 4531 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 1.36 IN
Camber Regd.: C= 0.14 IN
Beam Data:
Span: L= 15.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Camber Adjustment Factor: CAF= 1.5 X DLD
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 4.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 8.5 FT
Roof Duration Factor: Cd= 1.15
Wall Load: WALL= 53 PLF
Beam Self Weight: BSW= 21 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladj= 15.0 FT
Beam Uniform Live Load: wL= 325 PLF
Beam Uniform Dead Load: wD_adj= 279 PLF
Total Uniform Load: wT= 604 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2760 PS
Adjustment Factors: Cd =1.15
Fv': Fv'= 219 PS
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 16990 FT -LB
7.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 3715 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 73.87 N3
S= 232.55 N3
Area (Shear): Areq= 25.50 N2
A= 84.56 N2
Moment of Inertia (Deflection): Ireq= 382.22 N4
1= 1918.51 N4
Roof Beam( 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:26:07 AM
Project: ECO -GREEN LOT 23 Location: ROOF 14
Summary:
5.125 IN x 16.5 IN x 14.0 FT 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 255.2% Controlling Factor: Area Depth Required 8.99 In
Deflections:
Dead Load: DLD= 0.07 IN
Live Load: LLD= 0.08 IN L/2066
Total Load: TLD= 0.15 IN L/1111
Reactions (Each End):
Live Load: LL -Rxn= 2275 LB
Dead Load: DL -Rxn= 1954 LB
Total Load: TL -Rxn= 4229 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 1.27 IN
Camber Regd.: C= 0.10 IN
Beam Data:
Span: L= 14.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: L/ 180
Camber Adjustment Factor: CAF= 1.5 X DLD
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 4.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 8.5 FT
Roof Duration Factor: Cd= 1.15
Wall Load: WALL= 53 PLF
Beam Self Weight: BSW= 21 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladi= 14.0 FT
Beam Uniform Live Load: wL= 325 PLF
Beam Uniform Dead Load: wD_adi= 279 PLF
Total Uniform Load: wT= 604 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2760 PS
Adjustment Factors: Cd =1.15
Fv': Fv'= 219 PS
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 14800 FT -LB
7.0 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 3468 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 64.35 N3
S= 232.55 N3
Area (Shear): Areq= 23.80 N2
A= 84.56 N2
Moment of Inertia (Deflection): Ireq= 310.76 N4
1= 1918.51 N4
Roof Beam( 2000 international Building Code (97 NDS) 1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:26:45 AM
Project: ECO -GREEN LOT 23 Location: ROOF 15
Summary:
5.125 IN x 16.5 IN x 13.0 FT 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 292.1% Controlling Factor: Area Depth Required 8.35 In
Deflections:
Dead Load: DLD= 0.05 IN
Live Load: LLD= 0.06 IN L/2580
Total Load: TLD= 0.11 IN L/1388
Reactions (Each End):
Live Load: LL -Rxn= 2113 LB
Dead Load: DL -Rxn= 1814 LB
Total Load: TL -Rxn= 3927 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 1.18 IN
Camber Regd.: C= 0.08 IN
Beam Data:
Span: L= 13.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: U 240
Total Load Deflect. Criteria: U 180
Camber Adjustment Factor: CAF= 1.5 X DLD
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 4.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 8.5 FT
Roof Duration Factor: Cd= 1.15
Wall Load: WALL= 53 PLF
Beam Self Weight: BSW= 21 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladi= 13.0 FT
Beam Uniform Live Load: wL= 325 PLF
Beam Uniform Dead Load: wD_adl= 279 PLF
Total Uniform Load: wT= 604 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= .650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2760 PS
Adjustment Factors: Cd =1.15
Fv': Fv'= 219 PS
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 12762 FT -LB
6.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 3141 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 55.49 N3
S= 232.55 N3
Area (Shear): Areq= 21.57 N2
A= 84.56 N2
Moment of Inertia (Deflection): keg= 248.81 N4
I= 1918.51 N4
Roof Beamf 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:27:49 AM
Project: ECO -GREEN LOT 23 Location: ROOF 16
Summary:
5.125 IN x 13.5 IN x 14.0 FT 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 234.3% Controlling Factor: Section Modulus Depth Required 8.07 In
Deflections:
Dead Load: DLD= 0.10 IN
Live Load: LLD= 0.10. IN L/1634
Total Load: TLD= 0.20 IN L/841
Reactions (Each End):
Live Load: LL -Rxn= 1575 LB
Dead Load: DL -Rxn= 1485 LB
Total Load: TL -Rxn= 3060 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.92 IN
Camber Regd.: C= 0.15 IN
Beam Data:
Span: L= 14.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: U 180
Camber Adjustment Factor: CAF= 1.5 X DLD
Roof Loadinq:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 2.5 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 6.5 FT
Roof Duration Factor: Cd= 1.15
Wall Load: WALL= 53 PLF
Beam Self Weight: BSW= 17 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Lenqth: Ladj= 14.0 FT
Beam Uniform Live Load: wL= 225 PLF
Beam Uniform Dead Load: wD_adj= 212 PLF
Total Uniform Load: wT= 437 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2760 PS
Adjustment Factors: Cd =1.15
Fv': Fv'= 219 PS
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 10709 FT -LB
7.0 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 2570 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 46.56 N3
S= 155.67 N3
Area (Shear): Areq= 17.64 N2
A= 69.19 N2
Moment of Inertia (Deflection): Ireq= 224.86 N4
1= 1050.79 N4
Roof Beam( 2000 International Building Code (97 NDS) 1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 07:29:07 AM
Project: ECO -GREEN LOT 23 Location: ROOF 17
Summary:
3.5 IN x 5.5 IN x 4.0 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 121.6% Controlling Factor: Area Depth Required 3.46 In
Deflections:
Dead Load: DLD= 0.02 IN
Live Load: LLD= 0.02 IN L/2831
Total Load: TLD= 0.03 IN L/1474
Reactions (Each End):
Live Load: LL -Rxn= 400 LB
Dead Load: DL -Rxn= 368 LB
Total Load: TL -Rxn= 768 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.39 IN
Beam Data:
Span: L= 4.0 FT
Maximum Unbraced Span: Lu= 0.0 FT
Pitch Of Roof: RP= 4 12
Live Load Deflect. Criteria: L/ 240
Total Load Deflect. Criteria: U 180
Roof Loading:
Roof Live Load -Side One: LL1= 25.0 PSF
Roof Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 2.0 FT
Roof Live Load -Side Two: LL2= 25.0 PSF
Roof Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 6.0 FT
Roof Duration Factor: Cd= 1.15
Wall Load: WALL= 53 PLF
Beam Self Weight: BSW= 5 PLF
Slope /Pitch Adjusted Lengths and Loads:
Adjusted Beam Length: Ladi= 4.0 FT
Beam Uniform Live Load: wL= 200 PLF
Beam Uniform Dead Load: wD adl= 184 PLF
Total Uniform Load: wT= 384 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1323 PSI
Adjustment Factors: Cd =1.15 Cf =1.00
Fv': Fv'= 104 PSI
Adjustment Factors: Cd =1.15
Design Requirements:
Controlling Moment: M= 768 FT -LB
2.0 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 599 LB
At a distance d from support.
Critical shear created by combining all dead and live Toads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 6.97 N3
S= 17.65 N3
Area (Shear): Areq= 8.69 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 5.93 N4
1= 48.53 N4
Floor Joist' 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 08:54:51 AM
Project: eco -green lot 23 Location: flr jsts 1
Summary:
1.5 IN x 5.5 IN x 3.5 FT a 16 O.C. #2 Douglas Fir -Larch (North) Dry Use
Section Adequate By: 450.2% Controlling Factor: Area Depth Required 2.2 In
Center Span Deflections:
Dead Load: DLD- Center= 0.00 IN
Live Load: LLD Center= 0.01 IN L/7762
Total Load: TLD- Center= 0.01 IN U5645
Center Span Left End Reactions (Support A):
Live Load: LL- Rxn -A= 93 LB
Dead Load: DL- Rxn -A= 35 LB
Total Load: TL- Rxn -A= 128 LB
Bearinq Length Required (Beam only, support capacity not checked): BL -A= 0.14 IN
Center Span Right End Reactions (Support B):
Live Load:. LL- Rxn -B= 93 LB
Dead Load: DL- Rxn -B= 35 LB
Total Load: TL- Rxn -B= 128 LB
Bearing Length Required (Beam only, support capacity not checked): BL -B= 0.14 IN
Joist Data:
Center Span Length: L2= 3.5 FT
Floor sheathing applied to top of joists -top of joists fully braced.
Live Load Duration Factor: Cd= 1.00
Live Load Deflect. Criteria: L/ 480
Total Load Deflect. Criteria: U 360
Center Span Loading:
Uniform Floor Loading:
Live Load: LL -2= 40.0 PSF
Dead Load: DL -2= 15.0 PSF
Total Load: TL -2= 55.0 PSF
Total Load Adjusted for Joist Spacing: wT -2= 73 PLF
Properties For: #2- Douglas Fir -Larch (North)
Bending Stress: Fb= 850 PSI
Shear Stress: Fv= 95 PSI
Modulus of Elasticity: E= 1600000 PSI
Stress Perpendicular to Grain: Fc -perp= 625 'PSI
Adjusted Properties
Fb' (Tension): Fb'= 1271 PSI
Adjustment Factors: Cd =1.00 Cf =1.30 Cr =1.15
Fv': Fv'= 95 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 112 FT -LB
1.75 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear: V= 95 LB
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 1.06 N3
S= 7.56 N3
Area (Shear): Areq= 1.50 N2
A= 8.25 N2
Moment of Inertia (Deflection): Ireq= 1.33 N4
1= 20.80 N4
Floor Joistf 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 08:55:52 AM
Project: eco -green lot 23 Location: flr jsts 2
Summary:
1.5 IN x 7.25 IN x 6.5 FT (5 1.5) 16 O.C. #2 Douglas Fir -Larch (North) Dry Use
Section Adequate By: 342.0% Controlling Factor: Area Depth Required 3.63 In
Center Span Deflections:
Dead Load: DLD- Center= 0.00 IN
Live Load: LLD- Center= 0.01 IN L/6098
Total Load: TLD- Center= 0.01 IN L/4713
Right Cantilever Deflections:
Dead Load: DLD Right= 0.00 IN
Live Load: LLD Right= -0.01 IN 2U3811
Total Load: TLD- Right= -0.01 IN 2L/3151
Center Span Left End Reactions (Support A):
Live Load: LL- Rxn -A= 133 LB
Dead Load: DL- Rxn -A= 45 LB
Total Load: TL- Rxn -A= 179 LB
Bearing Length Required (Beam only, support capacity not checked): BL -A= 0.19 IN
Center Span Right End Reactions (Support B):
Live Load: LL- Rxn -B= 225 LB
Dead Load: DL- Rxn -B= 84 LB
Total Load: TL- Rxn -B= 310 LB
Bearing Length Required (Beam only, support capacity not checked): BL -B= 0.33 IN
Dead Load Uplift F.S.: FS= 1.5
Joist Data:
Center Span Length: L2= 5.0 FT
Right Cantilever Length: L3= 1.5 FT
Floor sheathing applied to top of joists -top of joists fully braced.
Live Load Duration Factor: Cd= 1.00
Live Load Deflect. Criteria: U 480
Total Load Deflect. Criteria: U 360
Center Span Loading:
Uniform Floor Loading:
Live Load: LL -2= 40.0 PSF
Dead Load: DL -2= 15.0 PSF
Total Load: TL -2= 55.0 PSF
Total Load Adjusted for Joist Spacing:. wT -2= 73 PLF
Right Cantilever Loading:
Uniform Floor Loading:
Live Load: LL -3= 40.0 PSF
Dead Load: DL -3= 15.0 PSF
Total Load: TL -3= 55.0 PSF
Total Load Adjusted for Joist Spacing: wT -3= 73 PLF
Properties For: #2- Douglas Fir -Larch (North)
Bending Stress: Fb= 850 PSI
Shear Stress: Fv= 95 PSI
Modulus of Elasticity: E_. 1600000 PSI
Stress Perpendicular to Grain: Fc -perp= 625 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1173 PSI
Adjustment Factors: Cd =1.00 Cf =1.20 Cr =1.15
Fv': Fv'= 95 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 218 FT -LB
2.45 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear: V= 156 LB
At a distance 'd from right support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2, 3
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 2.23 N3
S= 13.14 N3
Area (Shear): Areq= 2.46 N2
A= 10.88 N2
Moment of Inertia (Deflection): lreq= 6.00 N4
1= 47.63 N4
Uniformly Loaded Floor Beam( 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 08:57:54 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 1
Summary:
(2) 1.5 IN x 5.5 IN x 3.5 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 188.2% Controlling Factor: Area Depth Required 2.91 In
Deflections:
Dead Load: DLD= 0.00 IN
Live Load: LLD= 0.01 IN L/3813
Total Load: TLD= 0.02 IN L/2731
Reactions (Each End):
Live Load: LL -Rxn= 332 LB
Dead Load: DL -Rxn= 132 LB
Total Load: TL -Rxn= 464 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.27 IN
Beam Data:
Span: L= 3.5 FT
Unbraced Length -Top of Beam: Lu= 1.33 FT
Live Load Deflect. Criteria: L/ 360
Total Load Deflect. Criteria: L/ 240
Floor Loading:
Floor Live Load -Side One: LL1= 40.0 PSF
Floor Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 1.75 FT
Floor Live Load -Side Two: LL2= 40.0 PSF
Floor Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 3.0 FT
Live Load Duration Factor: Cd= 1.00
Wall Load: WALL= 0 PLF
Beam Loading:
Beam Total Live Load: wL= 190 PLF
Beam Self Weight: BSW= 4 PLF
Beam Total Dead Load: wD= 75 PLF
Total Maximum Load: wT= 265 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1148 PSI
Adjustment Factors: Cd =1.00 CI =1.00 Cf =1.00
Fv': Fv'= 90 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 406 FT -LB
1.75 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 344 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 4.25 N3
S= 15.13 N3
Area (Shear): Areq= 5.73 N2
A= 16.50 N2
Moment of Inertia (Deflection): Ireq= 3.93 N4
I= 41.59 N4
Uniformly Loaded Floor Beamf 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 08:58:51 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 2
Summary:
1.75 IN x 11 .875 IN x 7.0 FT Versa -Lam 2800 Fb DF Boise Cascade
Section Adequate By: 397.6% Controlling Factor: Section Modulus Depth Required 5.59 In
Deflections:
Dead Load: DLD= 0.01 IN
Live Load: LLD= 0.02 IN L/3453
Total Load: TLD= 0.03 IN L/2458
Reactions (Each End):
Live Load: LL -Rxn= 770 LB
Dead Load: DL -Rxn= 311 LB
Total Load: TL -Rxn= 1081 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.69 IN
Beam Data:
Span: L= 7.0 FT
Unbraced Length -Top of Beam: Lu= 1.33 FT
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: U 240
Floor Loadinq:
Floor Live Load -Side One: LL1= 40.0 PSF
Floor Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 2.5 FT
Floor Live Load -Side Two: LL2= 40.0 PSF
Floor Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 3.0 FT
Live Load Duration Factor: Cd= 1.00
Wall Load: WALL= 0 PLF
Beam Loading:
Beam Total Live Load: wL= 220 PLF
Beam Self Weight: BSW= 6 PLF
Beam Total Dead Load: wD= 89 PLF
Total Maximum Load: wT= 309 PLF
Properties For: Versa -Lam 2800 Fb DF- Boise Cascade
Bending Stress: Fb= 2800 PSI
Shear Stress: Fv= 285 PSI
Modulus of Elasticity: E= 2000000 PSI
Stress Perpendicular to Grain: Fc_perp= 900 PSI
Adjusted Properties
Fb' (Tension): Fb'= 2748 PSI
Adjustment Factors: Cd =1.00 CI =0.98 Cf =1.00
Fv': Fv'= 285 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 1893 FT -LB
3.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 779 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 8.27 N3
S= 41.13 N3
Area (Shear): Areq= 4.10 N2
A= 20.78 N2
Moment of Inertia (Deflection): Ireq= 25.46 N4
1= 244.21 N4
Multi- Loaded Beam( 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:01:04 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 3
Summary:
2 1.75 IN x 11.875 IN x 14.0 FT Versa -Lam 2800 Fb DF Boise Cascade
Section Adequate By: 322.6% Controlling Factor: Section Modulus Depth Required 6.87 In
Laminations are to be fully connected to provide uniform transfer of loads to all members
Center Span Deflections:
Dead Load: DLD- Center= 0.05 IN
Live Load: LLD- Center= 0.09 IN L/1885
Total Load: TLD- Center= 0.14 IN U1237
Center Span Left End Reactions (Support A):
Live Load: LL- Rxn -A= 712 LB
Dead Load: DL- Rxn -A= 372 LB
Total Load: TL- Rxn -A= 1083 LB
Bearing Length Required (Beam only, support capacity not checked): BL -A= 0.34 IN
Center Span Right End Reactions (Support B):
Live Load: LL- Rxn -B= 437 LB
Dead Load: DL- Rxn -B= 261 LB
Total Load: TL- Rxn -B= 697 LB
Bearing Length Required (Beam only, support capacity not checked): BL -B= 0.22 IN
Beam Data:
Center Span Length: L2= 14.0 FT
Center Span Unbraced Length -Top of Beam: Lu2 -Top= 9.5 FT
Center Span Unbraced Length -Bottom of Beam: Lu2- Bottom= 14.0 FT
Live Load Duration Factor: Cd= 1.00
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: U 240
Center Span Loading:
Uniform Load:
Live Load: wL -2= 27 PLF
Dead Load: wD -2= 10 PLF
Beam Self Weight: BSW= 13 PLF
Total Load: wT -2= 50 PLF
Point Load 1
Live Load: PL1 -2= 770 LB
Dead Load: PD1 -2= 311 LB
Location (From left end of span): X1 -2= 4.5 FT
Properties For: Versa -Lam 2800 Fb DF- Boise Cascade
Bending Stress: Fb= 2800 PSI
Shear Stress: Fv= 285 PSI
Modulus of Elasticity: E= 2000000 PSI
Stress Perpendicular to Grain: Fc_perp= 900 PSI
Adjusted Properties
Fb' (Tension): Fb'= 2683 PSI
Adjustment Factors: Cd =1.00 CI =0.96 Cf =1.00
Fv': Fv'= 285 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 4352 FT -LB
4.48 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear: V= 1034 LB
At a distance d from left support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 19.47 N3
S= 82.26 N3
Area (Shear): Areq= 5.44 N2
A= 41.56 N2
Moment of Inertia (Deflection): Ireq= 94.73 N4
I= 488.41 N4
Multi- Loaded Beam' 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:02:30 AM
Protect: ECO -GREEN LOT 23 Location: FLOOR 4
Summary:
2 1.75 IN x 11.875 IN x 14.0 FT Versa -Lam 2800 Fb DF Boise Cascade
Section Adequate By: 0.3% Controlling Factor: Area Depth Required 11.84 In
Laminations are to be fully connected to provide uniform transfer of loads to all members
Center Span Deflections:
Dead Load: DLD- Center= 0.10 IN
Live Load: LLD Center= 0.12 IN L/1398
Total Load: TLD- Center= 0.22 IN L/752
Center Span Left End Reactions (Support A):
Live Load: LL- Rxn -A= 4264 LB
Dead Load: DL- Rxn -A= 3660 LB
Total Load: TL- Rxn -A= 7923 LB
Bearing Length Required (Beam only, support capacity not checked): BL -A= 2.52 IN
Center Span Right End Reactions (Support B):
Live Load: LL- Rxn -B= 502 LB
Dead Load: DL- Rxn -B= 430 LB
Total Load: TL- Rxn -B= 932 LB
Bearing Length Required (Beam only, support capacity not checked): BL -B= 0.30 IN
Beam Data:
Center Span Length: L2= 14.0 FT
Center Span Unbraced Length -Top of Beam: Lu2 -Top= 14.0 FT
Center Span Unbraced Length- Bottom of Beam: Lu2- Bottom= 14.0 FT
Live Load Duration Factor: Cd= 1.00
Live Load Deflect. Criteria: L/ 360
Total Load Deflect. Criteria: L/ 240
Center Span Loading:
Uniform Load:
Live Load: wL -2= 27 PLF
Dead Load: wD -2= 10 PLF
Beam Self Weight: BSW= 13 PLF
Total Load: wT -2= 50 PLF
Point Load 1
Live Load: PL1 -2= 4388 LB
Dead Load: PD1 -2= 3768 LB
Location (From left end of span): X1 -2= 1.0 FT
Properties For: Versa -Lam 2800 Fb DF- Boise Cascade
Bending Stress: Fb= 2800 PSI
Shear Stress: Fv= 285 PSI
Modulus of Elasticity: E= 2000000 PSI
Stress Perpendicular to Grain: Fc_perp= 900 PSI
Adjusted Properties
Fb' (Tension): Fb'= 2579 PSI
Adjustment Factors: Cd =1.00 CI =0.92 Cf =1.00
Fv': Fv'= 285 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 7864 FT -LB
1.12 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear: V= 7874 LB
At a distance d from left support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 36.59 N3
S= 82.26 N3
Area (Shear): Areq= 41.44 N2
A= 41.56 N2
Moment of Inertia (Deflection): Ireq= 155.77 N4
1= 488.41 N4
Uniformly Loaded Floor Beam' 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:04:03 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 5
Summary:
3.5 IN x 5.5 IN x 2.5 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 108.6% Controlling Factor: Area Depth Required 3.11 In
Deflections:
Dead Load: DLD= 0.00 IN
Live Load: LLD= 0.01 IN U4639
Total Load: TLD= 0.01 IN U3351
Reactions (Each End):
Live Load: LL -Rxn= 625 LB
Dead Load: DL -Rxn= 240 LB
Total Load: TL -Rxn= 865 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.44 IN
Beam Data:
Span: L= 2.5 FT
Unbraced Length -Top of Beam: Lu= 1.33 FT
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: L/ 240
Floor Loading:
Floor Live Load -Side One: LL1= 40.0 PSF
Floor Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 7.0 FT
Floor Live Load -Side Two: LL2= 40.0 PSF
Floor Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 5.5 FT
Live Load Duration Factor: Cd= 1.00
Wall Load: WALL= 0 PLF
Beam Loading:
Beam Total Live Load: wL= 500 PLF
Beam Self Weight: BSW= 5 PLF
Beam Total Dead Load: wD= 192 PLF
Total Maximum Load: wT= 692 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1148 PSI
Adjustment Factors: Cd =1.00 CI =1.00 Cf =1.00
Fv': Fv'= 90 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 541 FT -LB
1.25 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 554 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 5.65 N3
S= 17.65 N3
Area (Shear): Areq= 9.23 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 3.77 N4
1= 48.53 N4
Uniformly Loaded Floor Beams 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:04:45 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 6
Summary:
3.5 IN x 5.5 IN x 5.0 FT #2 Mixed Southern Pine Dry Use
Section Adequate By: 14.4% Controlling Factor: Section Modulus Depth Required 5.14 In
Deflections:
Dead Load: DLD= 0.03 IN
Live Load: LLD= 0.07 IN L/853
Total Load: TLD= 0.10 IN L/614
Reactions (Each End):
Live Load: LL -Rxn= 850 LB
Dead Load: DL -Rxn= 330 LB
Total Load: TL -Rxn= 1180 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 0.60 IN
Beam Data:
Span: L= 5.0 FT
Unbraced Length -Top of Beam: Lu= 1.33 FT
Live Load Deflect. Criteria: L/ 360
Total Load Deflect. Criteria: L/ 240
Floor Loading:
Floor Live Load -Side One: LL1= 40.0 PSF
Floor Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 3.0 FT
Floor Live Load -Side Two: LL2= 40.0 PSF
Floor Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 5.5 FT
Live Load Duration Factor: Cd= 1.00
Wall Load: WALL= 0 PLF
Beam Loading:
Beam Total Live Load: wL= 340 PLF
Beam Self Weight: BSW= 5 PLF
Beam Total Dead Load: wD= 132 PLF
Total Maximum Load: wT= 472 PLF
Properties For: #2- Mixed Southern Pine
Bending Stress: Fb= 1150 PSI
Shear Stress: Fv= 90 PSI
Modulus of Elasticity: E= 1400000 PSI
Stress Perpendicular to Grain: Fc_perp= 565 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1148 PSI
Adjustment Factors: Cd =1.00 CI =1.00 Cf =1.00
Fv': Fv'= 90 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 1476 FT -LB
2.5 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 968 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 15.42 N3
S= 17.65 N3
Area (Shear): Areq= 16.13 N2
A= 19.25 N2
Moment of Inertia (Deflection): Ireq= 20.49 N4
1= 48.53 N4
Uniformly Loaded Floor Beard' 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:09:49 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 6
Summary:
5.125 IN x 19.5 IN x 16.0 FT 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 95.4% Controlling Factor: Area Depth Required 13.92 In
Deflections:
Dead Load: DLD= 0.21 IN
Live Load: LLD= 0.05 IN L/3712
Total Load: TLD= 0.26 IN L/733
Reactions (Each End):
Live Load: LL -Rxn= 1600 LB
Dead Load: DL -Rxn= 6498 LB
Total Load: TL -Rxn= 8098 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 2.43 IN
Camber Regd.: C= 0.32 IN
Beam Data:
Span: L= 16.0 FT
Unbraced Length -Top of Beam: Lu= 1.33 FT
Live Load Deflect. Criteria: L! 360
Total Load Deflect. Criteria: L/ 240
Camber Adjustment Factor: CAF= 1.5 X DLD
Floor Loading:
Floor Live Load -Side One: LL1= 40.0 PSF
Floor Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 3.0 FT
Floor Live Load -Side Two: LL2= 40.0 PSF
Floor Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Live Load Duration Factor: Cd= 1.00
Wall Load: WALL= 713 PLF
Beam Loading:
Beam Total Live Load: wL= 200 PLF
Beam Self Weight: BSW= 24 PLF
Beam Total Dead Load: wD= 812. PLF
Total Maximum Load: wT= 1012 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2349 PS
Adjustment Factors: Cd =1.00 CI =1.00 Cv =0.98
Fv': Fv'= 190 PS
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 32393 FT -LB
8.0 ft from left support
Critical moment created by combining all dead and live loads.
Controlling Shear: V= 6479 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 165.46 N3
S= 324.80 N3
Area (Shear): Areq= 51.15 N2
A= 99.94 N2
Moment of Inertia (Deflection): lreq= 1036.42 N4
1= 3166.77 N4
Uniformly Loaded Floor Beam[ 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:11:24 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 7
Summary:
5.125 IN x 19.5 IN x 15.0 FT 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 108.4% Controlling Factor: Area Depth Required 13.01 In
Deflections:
Dead Load: DLD= 0.16 IN
Live Load: LLD= 0.04 IN L/4505
Total Load: TLD= 0.20 IN L/890
Reactions (Each End):
Live Load: LL -Rxn= 1500 LB
Dead Load: DL -Rxn= 6092 LB
Total Load: TL -Rxn= 7592 LB
Bearing Length Required (Beam only, support capacity not checked): BL= 2.28 IN
Camber Reqd.: C= 0.24 IN
Beam Data:
Span: L= 15.0 FT
Unbraced Length -Top of Beam: Lu= 1.33 FT
Live Load Deflect. Criteria: L/ 360
Total Load Deflect. Criteria: L/ 240
Camber Adjustment Factor: CAF= 1.5 X DLD
Floor Loadinq:
Floor Live Load -Side One: LL1= 40.0 PSF
Floor Dead Load -Side One: DL1= 15.0 PSF
Tributary Width -Side One: TW1= 3.0 FT
Floor Live Load -Side Two: LL2= 40.0 PSF
Floor Dead Load -Side Two: DL2= 15.0 PSF
Tributary Width -Side Two: TW2= 2.0 FT
Live Load Duration Factor: Cd= 1.00
Wall Load: WALL= 713 PLF
Beam Loading:
Beam Total Live Load: wL= 200 PLF
Beam Self Weight: BSW= 24 PLF
Beam Total Dead Load: wD= 812 PLF
Total Maximum Load: wT= 1012 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bendinq Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2364 PS
Adjustment Factors: Cd =1.00 CI =1.00 Cv =0.99
Fv': Fv'= 190 PS
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 28471 FT -LB
7.5 ft from left support
Critical moment created by combining all dead and live loads.
Controllinq Shear: V= 6074 LB
At a distance d from support.
Critical shear created by combining all dead and live loads.
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 144.49 N3
S= 324.80 N3
Area (Shear): Areq= 47.95 N2
A= 99.94 N2
Moment of Inertia (Deflection): lreq= 853.98 N4
1= 3166.77. N4
Multi- Loaded Beam( 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:14:07 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 8
Summary:
5.125 IN x 12.0 IN x 17.5 FT (14 3.5) 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 113.5% Controlling Factor: Moment of Inertia Depth Required 9.32 In
Center Span Deflections:
Dead Load: DLD- Center= 0.05 IN
Live Load: LLD Center= 0.14 IN L/1230
Total Load: TLD- Center= 0.19 IN U891
Right Cantilever Deflections:
Dead Load: DLD- Right= -0.03 IN
Live Load: LLD Right= -0.11 IN 2L/769
Total Load: TLD- Right= -0.14 IN 2U585
Center Span Left End Reactions (Support A):
Live Load: LL- Rxn -A= 1470 LB
Dead Load: DL- Rxn -A= 617 LB
Total Load: TL- Rxn -A= 2087 LB
Bearing Length Required (Beam only, support capacity not checked): BL -A= 0.63 IN
Center Span Right End Reactions (Support B):
Live Load: LL- Rxn -B= 2297 LB
Dead Load: DL- Rxn -B= 1028 LB
Total Load: TL- Rxn -B= 3324 LB
Bearing Length Required (Beam only, support capacity not checked): BL -B= 1.00 IN
Dead Load Uplift F.S.: FS= 1.5
Beam Data:
Center Span Length: L2= 14.0 FT
Center Span Unbraced Length -Top of Beam: Lu2 -Top= 1.33 FT
Center Span Unbraced Length- Bottom of Beam: Lu2- Bottom= 14.0 FT
Right Cantilever Length: L3= 3.5 FT
Right Cantilever Unbraced Length -Top of Beam: Lu3 -Top= 1.33 FT
Right Cantilever Unbraced Length- Bottom of Beam: Lu3- Bottom= 3.5 FT
Live Load Duration Factor: Cd= 1.00
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: L/ 240
Center Span Loading:
Uniform Load:
Live Load: wL -2= 210 PLF
Dead Load: wD -2= 79 PLF
Beam Self Weight: BSW= 15 PLF
Total Load: wT -2= 304 PLF
Right Cantilever Loading:
Uniform Load:
Live Load: wL -3= 210 PLF
Dead Load: wD -3= 79 PLF
Beam Self Weight: BSW= 15 PLF
Total Load: wT -3= 304 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fc perp= 650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2396 PS
Adjustment Factors: Cd =1.00 C1 =1.00
Fv': Fv'= 190 PS
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 7162 FT -LB
6.86 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear: V= 1963 LB
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2, 3
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 35.87 N3
S= 123.00 N3
Area (Shear): Areq= 15.50 N2
A= 61.50 N2
Moment of Inertia (Deflection): keg= 345.71 N4
1= 738.00 N4
r t
Multi- Loaded Beam[ 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:15:34 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 9
Summary:
3.125 IN x 12.0 IN x 17.5 FT (14 3.5) 24F -V4 Visually Graded Western Species Dry Use
Section Adequate By: 95.3% Controlling Factor: Moment of Inertia Depth Required 9.6 In
Center Span Deflections:
Dead Load: DLD- Center= 0.06 IN
Live Load: LLD Center= 0.15 IN U1125
Total Load: TLD- Center= 0.21 IN L/817
Right Cantilever Deflections:
Dead Load: DLD- Right= -0.04 IN
Live Load: LLD Right= -0.12 IN 2L1703
Total Load: TLD- Right= -0.16 IN 2L1536
Center Span Left End Reactions (Support A):
Live Load: LL- Rxn -A= 980 LB
Dead Load: DL- Rxn -A= 408 LB
Total Load: TL- Rxn -A= 1388 LB
Bearing Length Required (Beam only, support capacity not checked): BL -A= 0.68 IN
Center Span Right End Reactions (Support B):
Live Load: LL- Rxn -B= 1531 LB
Dead Load: DL- Rxn -B= 679 LB
Total Load: TL- Rxn -B= 2211 LB
Bearing Length Required (Beam only, support capacity not checked): BL -B= 1.09 IN
Dead Load Uplift F.S.: FS= 1.5
Beam Data:
Center Span Length: L2= 14:0 FT
Center Span Unbraced Length -Top of Beam: Lug -Top= 1.33 FT
Center Span Unbraced Length- Bottom of Beam: Lu2- Bottom= 14.0 FT
Right Cantilever Length: L3= 3.5 FT
Right Cantilever Unbraced Length -Top of Beam: Lu3 -Top= 1.33 FT
Right Cantilever Unbraced Length- Bottom of Beam: Lu3- Bottom= 3.5 FT
Live Load Duration Factor: Cd= 1.00
Live Load Deflect. Criteria: U 360
Total Load Deflect. Criteria: U 240
Center Span Loading:
Uniform Load:
Live Load: wL -2= 140 PLF
Dead Load: wD -2= 53 PLF
Beam Self Weight: BSW= 9 PLF
Total Load: wT -2= 202 PLF
Right Cantilever Loading:
Uniform Load:
Live Load: wL -3= 140 PLF
Dead Load: wD -3= 53 PLF
Beam Self Weight: BSW= 9 PLF
Total Load: wT -3= 202 PLF
Properties For: 24F -V4- Visually Graded Western Species
Bending Stress: Fb= 2400 PS
Shear Stress: Fv= 190 PS
Modulus of Elasticity: Ex= 1800000 PS
Ey= 1600000 PS
Stress Perpendicular to Grain: Fe perp= 650 PS
Bending Stress of Comp. Face in Tension: Fb_cpr= 1200 PS
Adjusted Properties
Fb' (Tension): Fb'= 2388 PS
Adjustment Factors: Cd =1.00 Cl =1.00
Fv': Fv'= 190 PS
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 4763 FT -LB
6.86 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear: V= 1305 LB
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2, 3
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 23.93 IN3
S= 75.00 IN3
Area (Shear): Areq= 10.30 IN2
A= 37.50 IN2
Moment of Inertia (Deflection): Ireq= 230.47 IN4
I= 450.00 IN4
Multi- Loaded Beam[ 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008 09:30:25 AM
Project: ECO -GREEN LOT 23 Location: FLOOR 10
Summary:
3.5 IN x 9.25 IN x 17.0 FT (13 4) #2 Douglas Fir -Larch (North) Dry Use
Section Adequate By: 29.5% Controlling Factor: Section Modulus Depth Required 8.48 In
Center Span Deflections:
Dead Load: DLD- Center= 0.05 IN
Live Load: LLD Center= 0.21 IN L/747
Total Load: TLD- Center= 0.26 IN L/595
Right Cantilever Deflections:
Dead Load: DLD Right= -0.01 IN
Live Load: LLD Right= -0.21 IN 2L1467
Total Load: TLD- Right= -0.22 IN 2L/440
Center Span Left End Reactions (Support A):
Live Load: LL- Rxn -A= 780 LB
Dead Load: DL- Rxn -A= 283 LB
Total Load: TL- Rxn -A= 1063 LB
Bearing Length Required (Beam only, support capacity not checked): BL -A= 0.49 IN
Center Span Right End Reactions (Support B):
Live Load: LL- Rxn -B= 1888 LB
Dead Load: DL- Rxn -B= 795 LB
Total Load: TL- Rxn -B= 2683 LB
Bearing Length Required (Beam only, support capacity not checked): BL -B= 1.23 IN
Dead Load Uplift F.S.: FS= 1.5
Beam Data:
Center Span Length: L2= 13.0 FT
Center Span Unbraced Length -Top of Beam: Lu2 -Top= 1.33 FT
Center Span Unbraced Length- Bottom of Beam: Lu2- Bottom= 13.0 FT
Right Cantilever Length: L3= 4.0 FT
Right Cantilever Unbraced Length -Top of Beam: Lu3 -Top= 1.33 FT
Right Cantilever Unbraced Length- Bottom of Beam: Lu3- Bottom= 4.0 FT
Live Load Duration Factor: Cd= 1.00
Live Load Deflect. Criteria: LJ 360
Total Load'Deflect. Criteria: LJ 240
Center Span Loading:
Uniform Load:
Live Load: wL -2= 120 PLF
Dead Load: wD -2= 45 PLF
Beam Self Weight: BSW= 8 PLF
Total Load: wT -2= 173 PLF
Right Cantilever Loading:
Uniform Load:
Live Load: wL -3= 240 PLF
Dead Load: wD -3= 90 PLF
Beam Self Weight: BSW= 8 PLF
Total Load: wT -3= 338 PLF
Properties For: #2- Douglas Fir -Larch (North)
Bending Stress: Fb= 850 PSI
Shear Stress: Fv= 95 PSI
Modulus of Elasticity: E= 1600000 PSI
Stress Perpendicular to Grain: Fc_perp= 625 PSI
Adjusted Properties
Fb' (Tension): Fb'= 1018 PSI
Adjustment Factors: Cd =1.00 CI =1.00 Cf =1.20
Fv': Fv'= 95 PSI
Adjustment Factors: Cd =1.00
Design Requirements:
Controlling Moment: M= 3271 FT -LB
6.11 Ft from left support of span 2 (Center Span)
Critical moment created by combining all dead loads and live loads on span(s) 2
Controlling Shear: V= 1219 LB
At a distance d from right support of span 2 (Center Span)
Critical shear created by combining all dead loads and live loads on span(s) 2, 3
Comparisons With Required Sections:
Section Modulus (Moment): Sreq= 38.55 N3
S= 49.91 N3
Area (Shear): Areq= 19.25 N2
A= 32.38 N2
Moment of Inertia (Deflection): Ireq= 177.94 N4
I= 230.84 N4
r
Footing Design 1 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 10:15:10 AM
Project: ECO -GREEN LOT 23 Location: FOOTING 1
Summary:
Footing Size: 1.5 FT x 1.5 FT x 10.00 IN
Reinforcement: #4 Bars 11.00 IN. O.C. E/W (2) min.
Footing Loads:
Live Load: PL= 1575 LB
Dead Load: PD= 1487 LB
Total Load: PT= 3062 LB
Ultimate Factored Load: Pu= 4759 LB
Footing Properties:
Allowable Soil Bearing Pressure: Qs= 1500 PSF
Concrete Compressive Strength: F'c= 2500 PSI
Reinforcing Steel Yield Strenqth: Fy= 40000 PSI
Concrete Reinforcement Cover: c= 3.00 IN
Footing Size:
Width: W= 1.5 FT
Length: L= 1.5 FT
Depth: Depth= 10.00 IN
Effective Depth to Top Layer of Steel: d= 6.25 IN
Column and Baseplate Size:
Column Type: (Wood)
Column Width: m= 4.00 IN
Column Depth: n= 4.00 IN
Bearing Calculations:
Ultimate Bearing Pressure: Qu= 1361 PSF
Effective Allowable Soil Bearing Pressure: Qe= 1375 PSF
Required Footing Area: Areq= 2.23 SF
Area Provided: A= 2.25 SF
Baseplate Bearing:
Bearing Required: Bearing= 4759 LB
Allowable Bearing: Bearing Allow= 47600 LB
Beam Shear Calculations (One Way Shear):
Beam Shear: Vu1= 727 LB
Allowable Beam Shear: vc1= 9563 LB
Punching Shear Calculations (Two way shear):
Critical Perimeter: Bo= 41.00 IN
Punching Shear: Vu2= 3216 LB
Allowable Punching Shear (ACI 11 -35): vc2 -a= 65344 LB
Allowable Punching Shear (ACI 11 -36): vc2 -b= 88188 LB
Allowable Punchinq Shear (ACI 11 -37): vc2 -c= 43563 LB
Controlling Allowable Punching Shear: vc2= 43563 LB
Bending Calculations:
Factored Moment: Mu= 10708 IN -LB
Nominal Moment Strength: Mn= 85413 IN -LB
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 0.41 IN
Steel Required Based on Moment: As(1)= 0.05 IN2
Minimum Code Required Reinforcement (Shrinkage/Temperature ACI- 10.5.4): As(2)= 0.36 IN2
Controlling Reinforcing Steel: As -reqd= 0.36 IN2
Selected Reinforcement: #4 Bars 11.00 IN. O.C. E/W (2) Min.
Reinforcement Area Provided: As= 0.39 IN2
Development Length Calculations:
Development Length Required: Ld= 15.00 IN
Development Length Supplied: Ld -sup= 6.00 IN
Note: Plain concrete adequate for bending, therefore adequate development length not required.
Footing Design!' 2000 International Building Code (97 NDS) 1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 10:17:28 AM
Project: ECO -GREEN LOT 23 Location: FOOTING 2
Summary:
Footing Size: 1.0 FT x 1.0 FT x 8.00 IN
Footing has been designed without reinforcement
Footing Loads:
Live Load: PL= 664 LB
Dead Load: PD= 264 LB
Total Load: PT= 928 LB
Ultimate Factored Load: Pu= 1498 LB
Footing Properties:
Allowable Soil Bearing Pressure: Qs= 1500 PSF
Concrete Compressive Strength: F'c= 2500 PSI
Footing Size:
Width: W= 1.0 FT
Length: L= 1.0 FT
Depth: Depth= 8.00 IN
Effective Concrete Depth: d= 6.00 IN
Column and Baseplate Size:
Column Type: (Wood)
Column Width: m= 4.00 IN
Column Depth: n= 4.00 IN
Bearing Calculations:
Ultimate Bearing Pressure: Qu= 928 PSF
Effective Allowable Soil Bearing Pressure: Qe= 1400 PSF
Required Footing Area: Areq= 0.66 SF
Area Provided: A= 1.0 SF
Baseplate Bearing:
Bearing Required: Bearing= 1498 LB
Allowable Bearing: Bearing Allow= 44200 LB
Beam Shear Calculations (One Way Shear):
Beam Shear: Vu1= 0 LB
Allowable Beam Shear: vc1= 3120 LB
Punching Shear Calculations (Two way shear):
Critical Perimeter: Bo= 40.00 IN
Punching Shear: Vu2= 458 LB
Allowable Punching Shear: vc2= 20748 LB
Bending Calculations:
Factored Moment: Mu= 2248 IN -LB
Nominal Moment Strength: Mn= 11700 IN -LB
1 a
Footing Design 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 10:31:10 AM
Project: ECO -GREEN LOT 23 Location: FOOTING 3
Summary:
Footing Size: 2.5 FT x 2.5 FT x 10.00 IN
Reinforcement: #4 Bars 7.00 IN. O.C. E/W (4) min.
Footing Loads:
Live Load: PL= 1600 LB
Dead Load: PD= 6498 LB
Total Load: PT= 8098 LB
Ultimate Factored Load: Pu= 11817 LB
Footing Properties:
Allowable Soil Bearing Pressure: Qs= 1500 PSF
Concrete Compressive Strength: F'c= 2500 PSI
Reinforcing Steel Yield Strength: Fy= 40000 PSI
Concrete Reinforcement Cover: c= 3.00 IN
Footing Size:
Width: W= 2.5 FT
Length: L= 2.5 FT
Depth: Depth= 10.00 IN
Effective Depth to Top Layer of Steel: d= 6.25 IN
Column and Baseplate Size:
Column Type: (Concrete)
Column Width: m= 8.00 IN
Column Depth: n= 8.00 IN
Bearing Calculations:
Ultimate Bearing Pressure: Qu= 1296 PSF
Effective Allowable Soil Bearing Pressure: Qe= 1375 PSF
Required Footing Area: Areq= 5.89 SF
Area Provided: A= 6.25 SF
Baseplate Bearing:
Bearing Required: Bearing= 11817 LB
Allowable Bearing: Bearing- Allow= 190400 LB
Beam Shear Calculations (One Way Shear):
Beam Shear: Vu1= 1871 LB
Allowable Beam Shear: vc1= 15938 LB
Punching Shear Calculations (Two way shear):
Critical Perimeter: Bo= 57.00 IN
Punching Shear: Vu2= 9151 LB
Allowable Punching Shear (ACI 11 -35): vc2 -a= 90844 LB
Allowable Punching Shear (ACI 11 -36): vc2 -b= 96688 LB
Allowable Punching Shear (ACI 11 -37): vc2 -c= 60563 LB
Controlling Allowable Punching Shear: vc2= 60563 LB
Bending Calculations:
Factored Moment: Mu= 23831 IN -LB
Nominal Moment Strength: Mn= 169665 IN -LB
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 0.49 IN
Steel Required Based on Moment: As(1)= 0.11 IN2
Minimum Code Required Reinforcement (Shrinkage/Temperature ACI- 10.5.4): As(2)= 0.60 IN2
Controlling Reinforcing Steel: As -reqd= 0.60 IN2
Selected Reinforcement: #4 Bars 7.00 IN. O.C. E/W (4) Min.
Reinforcement Area Provided: As= 0.79 IN2
Development Length Calculations:
Development Length Required: Ld= 15.00 IN
Development Length Supplied: Ld -sup= 8.00 IN
Note: Plain concrete adequate for bending, therefore adequate development length not required.
Footing Design' 2000 International Building Code (97 NDS) Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 10:28:00 AM
Project: ECO -GREEN LOT 23 Location: FOOTING 4
Summary:
Footing Size: 3.75 FT x 3.75 FT x 10.00 IN
Reinforcement: #4 Bars 9.00 IN. O.C. E/W (5) min.
Footing Loads:
Live Load: PL= 3100 LB
Dead Load: PD= 12590 LB
Total Load: PT= 15690 LB
Ultimate Factored Load: Pu= 22896 LB
Footing Properties:
Allowable Soil Bearing Pressure: Qs= 1500 PSF
Concrete Compressive Strength: F'c= 2500 PSI
Reinforcing Steel Yield Strength: Fy= 40000 PSI
Concrete Reinforcement Cover: c= 3.00 IN
Footing Size:
Width: W= 3.75 FT
Length: L= 3.75 FT
Depth: Depth= 10.00 IN
Effective Depth to Top Layer of Steel: d= 6.25 IN
Column and Baseplate Size:
Column Type: (Concrete)
Column Width: m= 8.00 IN
Column Depth: n= 8.00 IN
Bearing Calculations:
Ultimate Bearing Pressure: Qu= 1116 PSF
Effective Allowable Soil Bearing Pressure: Qe= 1375 PSF
Required Footing Area: Areq= 11.41 SF
Area Provided: A= 14.06 SF
Baseplate Bearing:
Bearing Required: Bearing= 22896 LB
Allowable Bearing: Bearing Allow= 190400 LB
Beam Shear Calculations (One Way Shear):
Beam Shear: Vu1= 6233 LB
Allowable Beam Shear: vc1= 23906 LB
Punching Shear Calculations (Two way shear):
Critical Perimeter: Bo= 57.00 IN
Punching Shear: Vu2= 20600 LB
Allowable Punching Shear (ACI 11 -35): vc2 -a= 90844 LB
Allowable Punching Shear (ACI 11 -36): vc2 -b= 96688 LB
Allowable Punching Shear (ACI 11 -37): vc2 -c= 60563 LB
Controlling Allowable Punching Shear: vc2= 60563 LB
Bending Calculations:
Factored Moment: Mu= 87068 IN -LB
Nominal Moment Strength: Mn= 213532 IN -LB
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 0.41 IN
Steel Required Based on Moment: As(1)= 0.39 IN2
Minimum Code Required Reinforcement (Shrinkage/Temperature ACI- 10.5.4): As(2)= 0.90 IN2
Controlling Reinforcing Steel: As -reqd= 0.90 IN2
Selected Reinforcement: #4 Bars 9.00 IN. O.C. E/W 1 (5) Min.
Reinforcement Area Provided: As= 0.98 IN2
Development Length Calculations:
Development Length Required: Ld= 15.00 IN
Development Length Supplied: Ld -sup= 15.50 IN
Footing Design 2000 International Building Code (97 NDS) 1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 10:29:20 AM
Protect: ECO -GREEN LOT 23 Location: FOOTING 5
Summary:
Footing Size: 2.75 FT x 2.75 FT x 10.00 IN
Reinforcement: #4 Bars 8.00 IN. O.C. ENV (4) min.
Footing Loads:
Live Load: PL= 2970 LB
Dead Load: PD= 6709 LB
Total Load: PT= 9679 LB
Ultimate Factored Load: Pu= 14442 LB
Footing Properties:
Allowable Soil Bearing Pressure: Qs= 1500 PSF
Concrete Compressive Strength: F'c= 2500 PSI
Reinforcing Steel Yield Strength: Fy= 40000 PSI
Concrete Reinforcement Cover: c= 3.00 IN
Footing Size:
Width: W= 2.75. FT
Length: L= 2.75 FT
Depth: Depth= 10.00 IN
Effective Depth to Top Layer of Steel: d= 6.25 IN
Column and Baseplate Size:
Column Type: (Concrete)
Column Width: m= 8.00 IN
Column Depth: n= 8.00 IN
Bearing Calculations:
Ultimate Bearing Pressure: Qu= 1280 PSF
Effective Allowable Soil Bearing Pressure: Qe= 1375 PSF
Required Footing Area: Areq= 7.04 SF
Area Provided: A= 7.56 SF
Baseplate Bearing:
Bearing Required: Bearing= 14442 LB
Allowable Bearing: Bearing Allow= 190400 LB
Beam Shear Calculations (One Way Shear):
Beam Shear: Vu1= 2735 LB
Allowable Beam Shear: vc1= 17531 LB
Punching Shear Calculations (Two way shear):
Critical Perimeter: Bo= 57.00 IN
Punching Shear: Vu2= 11749 LB
Allowable Punching Shear (ACI 11 -35): vc2 -a= 90844 LB
Allowable Punching Shear (ACI 11 -36): vc2 -b= 96688 LB
Allowable Punching Shear (ACI 11 -37): vc2 -c= 60563 LB
Controlling Allowable Punching Shear: vc2= 60563 LB
Bending Calculations:
Factored Moment: Mu= 34189 IN -LB
Nominal Moment Strength: Mn= 170298 IN -LB
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 0.45 IN
Steel Required Based on Moment: As(1)= 0.15 IN2
Minimum Code Required Reinforcement (Shrinkage/Temperature ACI- 10.5.4): As(2)= 0.66 IN2
Controlling Reinforcing Steel: As -reqd= 0.66 IN2
Selected Reinforcement: #4 Bars 8.00 IN. O.C. E/W (4) Min.
Reinforcement Area Provided: As= 0.79 IN2
Development Length Calculations:
Development Length Required: Ld= 15.00 IN
Development Length Supplied: Ld -sup= 9.50 IN
Note: Plain concrete adequate for bending, therefore adequate development length not required.
,,A 1
Footing Design 2000 International Building Code (97 NDS)1 Ver: 6.00.7
By: Charles Smith Lindberg Smith on: 08 -06 -2008: 10:29:58 AM
Project: ECO -GREEN LOT 23 Location: FOOTING 6
Summary:
Footing Size: 2.0 FT x 2.0 FT x 10.00 IN
Reinforcement: #4 Bars 8.00 IN. O.C. E/W (3) min.
Footing Loads:
Live Load: PL= 2297 LB
Dead Load: PD= 1028 LB
Total Load: PT= 3325 LB
Ultimate Factored Load: Pu= 5344 LB
Footing Properties:
Allowable Soil Bearing Pressure: Qs= 1500 PSF
Concrete Compressive Strength: F'c= 2500 PSI
Reinforcing Steel Yield Strength: Fv= 40000 PSI
Concrete Reinforcement Cover: c= 3.00 IN
Footing Size:
Width: W= 2.0 FT
Length: L= 2.0 FT
Depth: Depth= 10.00 IN
Effective Depth to Top Layer of Steel: d= 6.25 IN
Column and Baseplate Size:
Column Type: (Concrete)
Column Width: m= 8.00 IN
Column Depth: n= 8.00 IN
Bearing Calculations:
Ultimate Bearing Pressure: Qu= 831 PSF
Effective Allowable Soil Bearing Pressure: Qe= 1375 PSF,
Required Footing Area: Areq= 2.42 SF
Area Provided: A= 4.0 SF
Baseplate Bearing:
Bearing Required: Bearing= 5344 LB
Allowable Bearing: Bearing Allow= 190400 LB
Beam Shear Calculations (One Way Shear):
Beam Shear: Vu1= 390 LB
Allowable Beam Shear: vc1= 12750 LB
Punching Shear Calculations (Two way shear):
Critical Perimeter: Bo= 57.00 IN
Punching Shear: Vu2= 3460 LB
Allowable Punching Shear (ACI 11 -35): vc2 -a= 90844 LB
Allowable Punching Shear (ACI 11 -36): vc2 -b= 96688 LB
Allowable Punching Shear (ACI 11 -37): vc2 -c= 60563 LB
Controlling Allowable Punching Shear: vc2= 60563 LB
Bending Calculations:
Factored Moment: Mu= 7125 IN -LB
Nominal Moment Strength: Mn= 127575 IN -LB
Reinforcement Calculations:
Concrete Compressive Block Depth: a= 0.46 IN
Steel Required Based on Moment: As(1)= 0.03 IN2
Minimum Code Required Reinforcement (Shrinkage/Temperature ACI- 10.5.4): As(2)= 0.48 IN2
Controlling Reinforcing Steel: As -reqd= 0.48 IN2
Selected Reinforcement: #4 Bars 8.00 IN. O.C. E/W (3) Min.
Reinforcement Area Provided: As= 0.59 IN2
Development Length Calculations:
Development Length Required: Ld= 15.00 IN
Development Length Supplied: Ld -sup= 5.00 IN
Note: Plain concrete adequate for bending, therefore adequate development length not required.