NTI MATERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
Specimen Transmittal Test Results Form
l
Engineers Land Surveyors Geologists
I Construction Inspection Materials Testing I SPECIMEN CONTROL l 1 2259
NTI 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452-8491
1. Material Type: Concrete Mortar Grout
Client: Nippon Paper Industries
2. of Specimens: 1 51 Special Handling:I
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 8/23/20121 5. Cast By: LCB
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist @npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson @npiusa.com
Sean Ofarrel: sofarrel @jhkelly.com _8. Date Received: 8/24/2012 9. Rec'd by: ZNS
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4"
ACTUAL 3" 3.0% 67.1 deg F 0745
Required Compressive Strength: 4500 PSI 28 DAYS
Remarks:
See attached for info for blank fields in this
COMPONENTS /MISCELLANEOUS _section
Concrete Mix: C -9646 No. of Sacks /CY: 6 1/2 Load Size: 9.0 CY
Aggregate- Cement- Water- Admix
3/4" 15460 Ibs Cement 5510 Ibs Water 257 gal POLY997 276 oz. Eclipse:
Sand 11960 Ibs MBAE90 14 oz W/C Ratio: 0.45
Location of Concrete Placement: D Footings
Additional Remarks:
Ticket ID: 36687 Ticket 36206 Gust 5133 Truck A60 Driver: Ron
Weather: Partially overcast Temperature: 70 deg F
TEST RESULTS (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 8/30/2012 SRW 5 58280 12.56 4640
B 4x8 28 9/20/2012 12.56 0
C 4x8 28 9/20/2012 12.56 0
D 4x8 28 9/20/2012 12.56 0
E 4x8 Hold HOLD 12.56 0
!Comments about breaks:
ei:ii NTI MA TERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
t Specimen Transmittal Test Results Form
Engineers Land Surveyors Geologists
Construction Inspection Materials Testing 1 SPECIMEN CONTROL I 1 2269
NTI 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452 -8491
1. Material Type: Concrete Mortar Grout
Client: Nippon Paper Industries
2. of Specimens: 51 Special Handling:
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A ['Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 8/28/20121 5. Cast By:. LCB
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist@npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson@npiusa.com
Sean Ofarrel: sofarrel@jhkelly.com 8. Date Received: 8/29/2012 9. Rec'd by: ZNS
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4"
ACTUAL 4 1/4" 3.4% 70.2 deg F 0800
Required Compressive Strength: 4500 PSI 28 DAYS
Remarks:
See attached for info for blank fields in this
COMPONENTS /MISCELLANEOUS section
Concrete Mix: C 9646 No. of Sacks /CY: 6 1/2 I Load Size: 9.0 CY
Aggregate- Cement- Water- Admix
3/4" 15500 Ibs Cement 5490 Ibs Water 212 gal POLY997 276 oz. Eclipse:
Sand 12420 Ibs MBAE90 13 oz W/C Ratio: 0.45
Location of Concrete Placement: D Footings
Additional Remarks:
Ticket ID: 36727 Ticket 36246 Cust 5133 Truck A61 Driver: Jason C
Weather: Partially overcast Temperature: 65.1 deg F
TEST RESULTS (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 9/4/2012 ZNS 5 57960 12.56 4615
B 4x8 28 9/25/2012 12.56 0
C 4x8 28 9/25/2012 12.56 0
D 4x8 28 9/25/2012 12.56 0
E 4x8 Hold HOLD 12.56 0
'Comments about breaks:
NT I MATERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
1 •l Specimen Transmittal Test Results Form
Engineers Land Surveyors Geologists
p g SPECIMEN CONTROL
Construction Inspection Materials Testing I 1 2251
NTI 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452.8491
1. Material Type: Concrete Mortar Grout
Client: Nippon Paper Industries
2. of Specimens: 1 51 Special Handling:I
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 8/20/2012) 5. Cast By: SRW
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist@npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson@npiusa.com
Sean Ofarrel: sofarrel@jhkelly.com 8. Date Received: 8/21/2012 9. Rec'd by: SRW
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4
ACTUAL 5" 3.9% 75 deg F 1135
Required Compressive Strength: 4500 PSI 28 DAYS
Remarks:
See attached for info for blank fields in this
COMPONENTS /MISCELLANEOUS section
Concrete Mix: C 9646 No. of Sacks /CY: 6 1/2 I Load Size: 9.0 CY
Aggregate- Cement- Water- Admix
3/4" 15480 Ibs Cement 5480 Ibs Water 233 gal POLY997 272 oz. Eclipse:
Sand 12160 Ibs MBAE90 13 oz W/C Ratio: 0.452
Location of Concrete Placement: D Footings
Additional Remarks:
Ticket ID: 36660 Ticket 36179 Cust 5133 Truck A72 Driver: Jim
Weather: Partially overcast Temperature: 70 deg F
TEST RESULTS (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 8/27/2012 ZNS 5 50120 12.56 3990
B 4x8 28 9/17/2012 12.56 0
c 4x8 28 9/17/2012 12.56 0
D 4x8 28 9/17/2012 12.56 0
E 4x8 Hold HOLD 12.56 0
(Comments about breaks:
NTI MATERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
1 el Specimen Transmittal Test Results Form
1 Engineers Land Surveyors Geologists
A Construction Inspection Materials Testing I SPECIMEN CONTROL I 12181
NTI 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452 -8491
1. Material Type: IN Concrete Mortar Grout
Client: Nippon Paper Industries
2. of Specimens: 1 51 Special Handling:1
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 7/19/20121 5. Cast By: LCB
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist @npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson @npiusa.com
Sean Ofarrel: sofarrel @jhkelly.com 8. Date Received: 7/20/2012 9. Rec'd by: ZNS
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4" 6.5%
ACTUAL 4.25" 3.8% 71.1 Deg F 0730
Required Compressive Strength: 4000 PSI 28 DAYS
Remarks:
See attached for info for blank fields in this
COMPONENTS /MISCELLANEOUS section
Concrete Mix: C 9646 No. of Sacks /CY: 6 1/2 I Load Size: 9.0 CY
Aggregate- Cement- Water- Admix
3/4" 15520 Ibs Cement 5450 Ibs Water 221 gal POLY997 276 oz. Eclipse:
Sand 12200 Ibs MBAE90 13 oz W/C Ratio: 0.455
Location of Concrete Placement: Conveyor Footings
Additional Remarks: Designation D
Ticket ID: 36335 Ticket 35854 Cust 5133 Truck A67 Driver: Dee
Weather: Overcast_ Temperature: 62.1 deg F
TEST RESULTS (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 7/26/2012 SRW 5 58570 12.56 4663
B 4x8 28 8/16/2012 SRW 2 63800 12.56 5080
C 4x8 28 8/16/2012 SRW 5 68300 12.56 5438
D 4x8 28 8/16/2012 SRW 5 68120 12.56 5424
E 4x8 Hold HOLD 12.56 0
(Comments about breaks:
D
v NTI MATERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
NW Specimen Transmittal Test Results Form
Engineers Land Surveyors Geologists
P Testing SPECIMEN CONTROL
Construction Inspection Materials Testin I 12154
NT/ 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 4528491
1. Material Type: Concrete Mortar Grout
Client: Nippon Paper Industries
2. of Specimens: 1 51 Special Handling:
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 6/28/20121 5. Cast By: ZNS
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist @npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson @npiusa.com
Sean Ofarrel: sofarrel @jhkelly.com 8. Date Received: 6/29/2012 9. Recd by: ZNS
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4"
ACTUAL 4.5" 70.0 deg F 1209
Required Compressive Strength: 4000 PSI 28 DAYS
Remarks: Structural Reinforcement Inspected by NTI prior to pouring concrete. All areas inspected appeared to meet project
specifications.
See attached for info for blank fields in this
COMPONENTS /MISCELLANEOUS section
Concrete Mix: C 9646R No. of Sacks /CY: 6 1/2 I Load Size: 9.0 CY
Aggregate- Cement- Water- Admix
3/4" 16280 Ibs Cement 5520 Ibs Water 197 gal POLY997 272 oz Eclipse:
Sand 13060 Ibs W/C Ratio: 0.449
Location of Concrete Placement: Conveyor Footing
Additional Remarks: Designation D
Ticket ID: 36137 Ticket 35656 Cust 5133 Truck A67 Driver: DEE
Weather: Clear Temperature: 66.2 deg F
TEST (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 7/5/2012 LCB 3 60870 12.56 4846
B 4x8 28 7/26/2012 12.56 0
c 4x8 28 7/26/2012 12.56 0
D 4x8 28 7/26/2012 12.56 0
E 4x8 Hold HOLD 12.56 0
'Comments about breaks: I
D
A NTI MATERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
1. ■ik Specimen Transmittal Test Results Form
Engineers Land Surveyors Geologists
P g SPECIMEN CONTROL Construction Inspection Materials Testing I 12147
NTI 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 4528491
1. Material Type: Concrete Mortar Grout
Client:, Nippon Paper Industries
2. of Specimens: 1 51 Special Handling:
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 6/20/20121 5. Cast By: ZNS
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist @npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson @npiusa.com
Sean Ofarrel: sofarrel @jhkelly.com 8. Date Received: 6/20/2012 9. Rec'd by: ZNS
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4" 6.5%
ACTUAL 4.25" 6.4% 71.9 deg F 1320
Required Compressive Strength: 4000 PSI 28 DAYS
Remarks: Structural Reinforcement Inspected by NTI prior to pouring concrete. All areas inspected appeared to meet project
specifications.
See attached for into for blank fields in this
COMPONENTS /MISCELLANEOUS section
Concrete Mix: C 9646 No. of Sacks /CY: 6 1/2 I Load Size: 7.0 CY
Aggregate- Cement- Water- Admix
3/4" 12100 Ibs Cement 4260 Ibs Water 165 gal POLY997 212 oz Eclipse:
Sand 9640 Ibs MBAE90 10 oz W/C Ratio: 0.453
Location of Concrete Placement: B Footing
Additional Remarks: Designation D
Ticket ID: 36043 Ticket 35562 Cust 5133 Truck A67 Driver: DEE
Weather: Clear Temperature: 66.2 deg F
TEST (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 6/27/2012 ZNS 3 57070 12.56 4544
B 4x8 28 7/18/2012 ZNS 5 61680 12.56 4911
c 4x8 28 7/18/2012 ZNS 5 67370 12.56 5364
D 4x8 28 7/18/2012 ZNS 5 69070 12.56 5499
E 4x8 Hold HOLD 12.56 0
(Comments about breaks:
G
NTI MATERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
�l r�jx' Specimen Transmittal Test Results Form
Engineers Land Surveyors Geologists
Construction Inspection Materials Testing I SPECIMEN CONTROL I 12137
NT/ 711 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452 -8491
1. Material Type: Concrete Mortar Grout
Client: Nippon Paper Industries
2. of Specimens: 1 51 Special Handling:)
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 6/4/20121 5. Cast By: LCB
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist @npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson @npiusa.com
Sean Ofarrel: sofarrel @jhkelly.com 8. Date Received: 6/5/2012 9. Rec'd by: LCB
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4" 6.5%
ACTUAL 4" 6% 61.9 deg F 0740
Required Compressive Strength: 4500 PSI 28 DAYS
Remarks: Structural Reinforcement Inspected by NTI prior to pouring concrete. All areas inspected appeared to meet project
specifications.
See attached for info for blank fields in this
COMPONENTS /MISCELLANEOUS section
Concrete Mix: C -9646 No. of Sacks /CY: 6 1/2 Load Size: 9.0 CY
Aggregate- Cement- Water- Admix
3/4" 15420 Ibs Cement 5450 Ibs Water 189 gal POLY997 276 oz Eclipse:
Sand 12480 Ibs MBAE90 23 oz W/C Ratio: 0.435
Location of Concrete Placement: Fan Base
Additional Remarks: Designation C
Ticket ID: 35870 Ticket 35389 Cust 5133 Truck A60 Driver: Jeff
Weather: Overcast Temperature: 49.8 deg F
TEST RESULTS (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 6/11/2012 ZNS 3 56680 12.56 4513
B 4x8 28 7/2/2012 LCB 5 67590 12.56 5381
C 4x8 28 7/2/2012 LCB 3 67320 12.56 5360
D 4x8 28 7/2/2012 LCB 6 67100. 12.56 5342
E 4x8 Hold HOLD 12.56 0
Comments about breaks:
�`iF' NTI MATERIALS TESTING LABORATORY COMPRESSIVE STRENGTH TEST
NW Specimen Transmittal Test Results Form
II Engineers Lond Surveyors Geologists
P Testing SPECIMEN CONTROL
NTI Construction Inspection Materials testin I I 12112
N I 717 SOUTH PEABODY, PORT ANGELES, WASHINGTON 98362, (360) 452.6491
1. Material Type: Concrete Mortar Grout
Client: Nippon Paper Industries
2. of Specimens: 1 51 Special Handling:)
Project: Cogeneration
3. Testing Sequence Requested (days after casting):
BILLING INFORMATION Standard A Standard B Standard C Other (Specify)
7,28,28, H 7,28,28,28 28,28 7,28,28,28,H
Lab Account
Project Account ID NPNP 1001 -03 4. Date Cast: 1 5/7/20121 5. Cast By: LCB
Project Manager Shawn West
6. Material Supplied by: ACP
Contacts:
Gary Holmquist: gary.holmquist @npiusa.com 7. Contractor: J.H. Kelly
Russ Wilson: Russ.wilson @npiusa.com
Sean Ofarrel: sofarrel @jhkelly.com 8. Date Received: 5/8/2012 9. Rec'd by: LCB
MATERIAL SPECIFICATIONS
SLUMP AIR ENTRAINMENT CONCRETE TEMPERATURE TIME
DESIGN 4" 4.5 -6.5%
ACTUAL 5.5" 59.1 deg F 0805
Required Compressive Strength: 4500 PSI 28 DAYS
Remarks: Structural Reinforcement Inspected by NTI prior to pouring concrete. All areas inspected appeared to meet project
specifications.
See attached for info for blank fields in this
COMPONENTS /MISCELLANEOUS section
Concrete Mix: C -9646 No. of Sacks /CY: 6 1/2 I Load Size: 9.0 CY
Aggregate- Cement- Admix- Water
3/4" 15440 Ibs Cement 5500 Ibs Poly 997 272 oz Water 181 gal Eclipse:
Sand 12440 Ibs MBAE90 40 oz
W/C Ratio: 0.41
Location of Concrete Placement: Boiler Walls
Additional Remarks:
Ticket ID: 35555 Ticket 35074 Cust 5133 Truck A50 Driver: Bill
Weather: Clear Temperature: 60 deg F
TEST RESULTS (TO BE FILLED OUT BY NTI PERSONNEL ONLY)
Specimen Specimen Test Date Tested Checked Break Total Unit Load
Type Days Tested By By Type Load Area PSI
A 4x8 7 5/14/2012 SRW 5 40410 12.56 3217
B 4x8 28 6/4/2012 LCB 5 48940 12.56 3896
c 4x8 28 6/4/2012 LCB 5 47500 12.56 3782
D 4x8 28 6/4/2012 LCB 5 48120 12.56 3831
E 4x8 56 7/2/2012 LCB 5 50670 12.56 4034
'Comments about breaks: I