Loading...
HomeMy WebLinkAbout1035 W 5th St - EngineeringBUILDING PERMIT 1035W5 12 -320 ENGINEERING egov. op-AAA/ ty 5• zs 26,IPsA 7, iy,zsd-w= t3: el i 1-7 1.7_1- 1 ,4 (3 2) 2,0,9LI, y4 14, ci(I/k) iz 3775 2 tqa a 411r15.\‘ i4\ ,20,q65 gL/ P 3a )0 RECEIVED APR 1 2 2012 CITY OF PORT ANGELES BUILDING DIVISION Na•S ..5 AI' 4, A /or P141ks 7 3/ 2,0 I A-7 tr 3 "it 624=3 6P I ab II }P.die...,-s, Pwe- sl'uac I// 74.5A 1q9e' 1 j 2 10c1 (2, LJIIIIIIIIIII e7 691e1- iop6463\ 4 isa r- aPoo IX epz .19 )s06 0 64 lib ,i- )0(C,75): 1)7.17' .P3 72232 4 1.2s SI A/ C ioo-z I J- /04r2 i i 5/ 12S 3 47 —tg. ,2X0 8 1,7 Pti j4gyi. 4d 7/6_ Is73): Lb Zeit L.:otiwa4 L 45 etc' /6_61A t 3s-- 5`• Rsu _z_ 7 140 2 Li,s 2766)(5:A hpfq 3:3 4)-eL z ri4.3-7 reAs-f 12S 7/45%-tfAc.46 el HVod s 4/ 1 a 3AL gk *thy *A S 27 017 1* 'd ,t4 6 1 1- e/C ecb sd 2 4.1 3Z2± ot64,A..fo•- 611 0 .236D ,35`D Poe 21 6_ .,fr Ligut A Zottu!rii.. 1 ‘S":57 2 .7. s t ei e e: 75/" "226 22DED‘ (6 6tt 9)6 c iepo.be(2_2 -t_2,.3z„rPce gO grv\ Di6/1 3 g 1 .11 s'6 or 6 arr--i- 61- 27 &4 26 211>c A/4424 J71 2 3 6 -7v oc 7e 44,00 24 2_ 1 A 072)1 5 I ty-4/ 2-37, s 7 2 6s-41 'ZJ122i -7 Pee 4444 7)7 ,-dz%A 1( 12143 3 66 47--R lc Qjv AC r _;7,. Sail 7- 1-6..S,..7 4 a 412/48 i/ i at 1 _4 i I 7 1 7 I I I I I I t rlH Ajr\ [1'1;171 1 I 7 r I I 1 i 7 1 ,7 1 4 I. 7 1 6<ef/k -i---- 1 i i i Ul) i 71 4 y-3 11 1_ 7L V 111,• 7 i i T T I i ,I I I 1 r i 1 I I 1 i I 4 I I 1 i 4 I I I I LL 1 71 f /1,1 -____4__•- ,-_.L i I I I I 1 I I 1 I I 1 J i I 1 i 1"7:74_ r I I I .4 I i I i i 1 i 7 i i f i I 1 ;ii 7; i I I I I i I I 1,r i 1 1 j I 1 1 17 61j/ L 1 1 I I i f i -1---j r T T 1 i--,- 7 14 itizW 6 2-'1 1 4 i 1;;;;;!!!•! 4- 1 i ;Li 1 7;;;1 i■ijiii, 7 I 11.11 1 ii, ii I 1, i i 1 i I II 4 1 i I 4 1 1--- -1--- 1 ,,ti 1,, 1 I I 1 I I 1_ I --I t t 1_ t 4:640 f ,f7 ;11 il)11 i !I' 7 1 I 1 1 ii 1 i I Q" j.----/ A 3 I' I t I t H I .,L_ _1 1 ...1— I I 1 i 1 1 ..—H I d___ i___ i I id.. i_____, .1_ _d_ I i I t i i i j 1 -1 f j 1 1 I I 1 I I I i r t F 1 i 1 i i i I I I 1 t I I I 1 I i 1 I I _j_ I I i 1 i i i i I 1 I 1 1 r 1 1 1 1 1 I 1 1 1 r 1 1 f 1 ----I-- I t I I. I I I f 1 f I I i r i i r 1 77/1 1 i ---I 7 i i 1 i 1 I 1 1 1 1, I i 1 1 i i i i j j j r 1 1 7 7 1 I I I j I I 1 I I 7 I 7 I \LA \,(`-'1\' 1 I r 7 7 3 7 Y/L/ j S 7 i I L ij(qL6,,LI 1 T I I I ill-I; i 1 I j 1 g 1 1 i 1 1 I 1 _I___ I I i I 1 741 1 X X 1 1 S1 5 1 I 1 I 1 1 '0 1! i h i 1 1 I 1 I i f i r i 1 t 1 i C 1 i I I j j i I j --4 Ii 1 1 I I "I 1 1 1 I 1.2■-■-.................,„■■■• 1 1 7 7 j 1 r J I I 1 1 c i-:' ,a--, Im- I I I i 1 j 1 j i Iti-Z:1(-2S 1 I I 1 1 j J 1— 1 I --I 1 7 1 I 1 1 1±4_ 1j 71- 1, 1! j 1 I j i f I I -i-• I _t_ 1 ,!II.!1 i j t i litt I 'l.C.; )1'''''''' ,,,L 3- 4S i f 1 j L(pro 1 L••...) 7- 30 1 -t I $4:;),r,t) I Ft 7 PO P 'I. I r Z -4;' •ii-- I i 1 •■■..i■■■ I i I --1.---•1.-- :."---t.2-- 0 ___I 1 1 i I 1 7 1 7 j 7 i 7 7 I 1 1 i 1 1 7 7 I 1 3 I 7 j i j 7 7 7 I 1- 7 I I I 1 I I I 1 1 I 7 7 I 7 i 2 7 7 1 I 7 4 2 ---7---- 1 -1 7 i n j j iji!It f t I, t I I I I •v I j d I I I I I I I I I I t J i I' i 11 I 1 i; 1 i I 7 7 I 1 1 7 1 7 7 I 7 j 7 7 7 7 7 j 7 1 .-''7 i ),a: 3 7 7 7 1 j 1 t t 11 i' L L L 1...- I I 1 i I I i tc/1 i 1 I i t. I ,61,S ,s. 5 s7;' i -1)1). 1- 6, c: ',t- 4 1- 23 1 6L 4 7 7 I 2 7 1 I i 7 I I 7 1 t--1 4 1.1 cl/b6 I i f j i, .7--, i i 0 7 i I 1 7 1 i 1 1 i i M ember;Name� r R e s ults r f 4� r �Current�Solut3on �n� -��.a� r n r �Comme Roof: RIDGE BEAM Passed 1 Piece(s) 5 1/2" x 19 1/2" 24F -V4 DF Glulam �ti Roof: HEADER AT DORMER Passed 1 Piece(s) 3 1/2" x 9" 24F -V4 DF Glulam Roof: RIDGE HEADER Passed 1 Plece(s) 3 1/2" x 12" 24F -V4 DF Glulam ID FiooR-F'RA[4 Member Re merit a f �iaSoluUon� f T <CommeMs Floor: JOIST -BEAM Passed 1 Piece(s) 11 7/8" TJI® 360 16" OC Reinforcement accessories required Floor: Joist Passed 1 Piece(s) 11 7/8" TJIp 230 16" OC Floor: Drop Beam Passed 1 Piece(s) 3 1/2" x 9" 24F -V4 DF Glulam Floor: Joist W /CANT Passed 1 Piece(s) 11 7/8" TJI® 230 16" OC Floor: RIM Passed 1 Piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL Floor: RIM /HEADER Passed 1 Piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL Floor: FLUSH BEAM Passed 2 Piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL Floor: RIM /BEAM Passed 3 Piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL Floor: HEAVY TIMBER BEAM Passed 1 Piece(s) 4 x 12 Douglas Fir -Larch No. 1 F O R T E` JOB SUMMARY REPORT Forte Software Operator Scott Headrick Zenovic Assoc. 1 (360) 417 -0501 Scott @zenovic.net Job Notes 12067 CHRIS JAMES 4/11/2012 2:55:43 PM Forte v3.5, Design Engine: V5.5.3.2 Page 1 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott @zenovic.net 12067 CHRIS JAMES wY yy 3.5_. k De3,gnrPtesuls -+w= vr.oga ail d nr trw tora Y.s' -d_ :h.. a iowee s u tr m_ "sue F, F z3' ni+ xr yc.. icaa comi �r71 t ,.:�:4- +�'s._.' Member Reaction (Ibs) 9659 4" 18906 Passed (51 1.0 D 1.0 S (All Spans) Shear (Ibs) 8084 2' 1" 21790 Passed (37 1.15 1.0 D 1.0 S (All Spans) Pos Moment (Ft -Ibs) 61135 13' 11 11/16" 73860 Passed (83 1.15 1.0 D 1.0 S (All Spans) Live Load Defl. (in) 0.812 13' 11 15/16" 1.367 Passed (L/404) 1.0 D 1.0 S (All Spans) Total Load Defl. (in) 1.353 13' 11 15/16" 1.822 Passed (L/242) 1.0 D 1.0 S (All Spans) FORTE 0 MEMBER REPORT ROOF, Roof: RIDGE BEAM 1 piece(s) 5 1/2" x 19 1/2" 24F -V4 DF Glulam All Dimensions Are Horizontal;Drawing is Conceptual on critena: LL (L/240) and TL (L/180). Overall Length: 28' Bracing (Lu): All compression edges (top and bottom) must be braced at 28' o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. Critical positive moment adjusted by a volume factor of 0.92 that was calculated using length L 27' 4 The effects of positive or negative camber have not been accounted for when calculating deflection. The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer. Applicable calculations are based on NDS 2005 methodology. 1- Stud wall DF 2- Stud wall DF cz 5.50" 5.50" sAvaltable 5.50" 5.50" :Acquired, 2.81" 2.78" 3850 3810 5809 5741 9659 9551 Blocking Blocking Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. 1 Uniform(PSF) 2 Uniform(PSF) 3 Uniform(PSF) 0 to 7' 7' to 21' 21' to 28' 18' 3" 15' 17' 9" 15.0 15.0 15.0 25.0 25.0 25.0 Roof etuser too Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design loads, dimensions and support information have been provided by SRH 0 System Roof Member Type Drop Beam Building Use Residential Building Code IBC Design Methodology ASD Member Pitch: 0/12 PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:43 PM Forte v3.5, Design Engine: V5.5.3.2 Page 2 of 13 Forte Software Operator Job Notes Scott Headrick Zeno rc Assoc. (360) 417 -0501 Scott @zenovic.net 12067 CHRIS JAMES DeSl gni,r 'MA oo Result Wad Combinaird (Pattie I 1? a Member Reaction (Ibs) 2427 2" 4922 Passed (49 1.0 D 1.0 S (All Spans) Shear (Ibs) 2110 1' 1/2" 6400 Passed (33 1.15 1.0 D 1.0 S (All Spans) Pos Moment (Ft -Ibs) 8571 7' 2 1/4" 10868 Passed (79 1.15 1.0 D 1.0 S (All Spans) Live Load Defl. (in) 0.500 7' 3 1/2" 0.712 Passed (L/342) 1.0 D 1.0 S (All Spans) Total Load Defl. (in) 0.819 7' 3 1/2" 0.950 Passed (L/209) 1.0 D 1.0 5 (All Spans) O 'ORTE' MEMBER REPORT ROOF, Roof: HEADER AT DORMER 1 piece(s) 3 1/2" x 9" 24F -V4 DF Glulam 0 All Dimensions Are Horizontal;Drawing is Conceptual efiection criteria: LL (1./240) and TL (1/180). Overall Length: 14' 7" Rim Board is assumed to carry all loads applied directly above It bypassing the member being designed. 1 Uniform(PSF) 0to14'7" 8' 3" 15.0 25.0 Roof 0 Bracing (W): All compression edges (top and bottom) must be braced at 14' 4 1/2" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L 14' 3 The effects of positive or negative camber have not been accounted for when calculating deflection. The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer. Applicable calculations are based on NDS 2005 methodology. 1 Stud wall DF 2- Stud wall DF Bearii otal 1 zAVaila�e Ri Few' 3.50" 3.50" 2.25" 2.25" 1.50" 1.50" 957 957 1504 1504 2461 2461 1 1/4" Rim Board 1 1/4" Rim Board WeyerteaeuserN Weyerhaeuser warrants that the sizing of Its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation is compatible with the overall project Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design loads, dimensions and support Information have been provided by SRI-1 System Roof Member Type Flush Beam Building Use Residential Building Code IBC Design Methodology ASD Member Pitch: 0/12 PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:43 PM Forte v3.5, Design Engine: V5.5.3.2 Page 3 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott@zenovic.net 12067 CHRIS JAMES 4D t YI `r AC♦h1a ..L.0 g-4" s /U tOWCdi 4RESUit"ial f' LDFi fLOdd CAll iiii d_O ft 6,0nI Member Reaction (lbs) 5136 1 1/2" 6825 Passed (75 1.0 D 1.0 S (Ali Spans) Shear (lbs) 5024 1' 3" 8533 Passed (59 1.15 1.0 D 1.0 S (All Spans) Pos Moment (Ft -Ibs) 19182 4' 19320 Passed (99 1.15 1.0 D 1.0 S (All Spans) Live Load Defl. (in) 0.111 4' 0.387 Passed (L/841) 1.0 D 1.0 S (All Spans) Total Load Defl. (in) 0.184 4' 0.517 Passed (L/504) 1.0 D 1.0 S (All Spans) 1 F ®RTE' MEMBER REPORT ROOF, Roof: RIDGE HEADER 1 piece(s) 3 1/2" x 12" 24F -V4 DF Glulam 0 All Dimensions Are Horizontal;Drawing is Conceptual Overall Length: 8' Deflection criteria: LL (L1240) and TL (L/180). Bracing (Lu): All compression edges (top and bottom) must be braced at 2' 1 5/16" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L 7' 9". The effects of positive or negative camber have not been accounted for when calculating deflection. The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as Indicated by the manufacturer. Applicable calculations are based on NDS 2005 methodology. 1 Trimmer DF 2 Trimmer DF 3.00" 3.00" gr ailat ee 3.00" 3.00" Acquired: 2.26" 2.26" bs 2066 2066 3071 3071 5137 5137 None None 1 Uniform(PSF) 2 Point(lb) Boar 0 to 8' 4' 4 111ibutaryr.; Wkl 2' N/A (tA90)gg�` 15.0 3810 (1 15 }w 25.0 5741 Roof Linked from: Roof: RIDGE BEAM, Support 2 euserr Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design loads, dimensions and support information have been provided by SRH 0 System Roof Member Type Flush Beam Building Use Residential Building Code IBC Design Methodology ASD Member Pitch: 0/12 PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:43 PM Forte v3.5, Design Engine: V5.5.3.2 Page 4 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott@zenovic.net 12067 CHRIS JAMES IiesiWResults *b.741767 cation 3 ,/►tow ed 1 s,Reau >1 e LDFj toad Combf aHa� (Patbe�n) a 3Y; Member Reaction (Ibs) 1680 2 1/2" 1794 Passed (94 1.15 1.0 D 1.0 S (All Spans) Shear (lbs) 1678 3 1/2" 1961 Passed (86 1.15 1.0 D 1.0 S (All Spans) Moment (Ft-lbs) 6270 4' 7107 Passed (88 1.15 1.0 D 1.0 5 (All Spans) Live Load Dell. (in) 0.183 4' 0.273 Passed (L/714) 1.0 D 1.0 S (All Spans) Total Load Defl. (in) 0.311 4' 0.546 Passed (L/421) 1.0 D 1.0 5 (All Spans) 1 3-Pro""' Rating 65 40 Passed g1 F T E MEMBER REPORT 2ND FLOOR FRAMING, Floor: JOIST -BEAM 1 piece(s) 11 7/8" TDI® 360 16" OC ntena: LL 1/480) and TL (U240). 0 0 All Dimensions Are Horizontal;Drawing is Conceptual Overall Length: 11' 6" 11' 6" Bracing (W): All compression edges (top and bottom) must be braced at 3' 2 1/16" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing Is required to achieve member stability. A structural analysis of the deck has not been performed. Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser Edge"" Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the TJ -Pro Rating include: 5/8" Gypsum ceiling. 1 Stud wall DF 2- Stud wall DF 3.50" 5.50" it l 2.25" 4.25" 1.84" 1.75" oa= 700 302 982 410 311 522 �7ota1 1984 1243 Web Stiffeners, 1 1/4" Rim Board 1 1/4" Rim Board Rim Board is assumed to carry all loads applied directly above it bypassing the member being designed. 1 Unifomi(PSF) 2 Point(lb) 0to11'6" 4' 16" N/A 10.0 957 a A O or Live r? 40.0 1504 Residential Living Areas Linked from: Roof: HEADER AT DORMER, Support 1 Web stiffeners required at location 4' due to loads. 0 Memb_e JOIST WITH POINT LOAD FROM DORMER BEAM Weyerhaeuser Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rini Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design loads, dimensions and support information have been provided by SRH System Floor Member Type Joist Building Use Residential Building Code IBC Design Methodology ASD PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:43 PM Forte v3.5, Design Engine: V5.5.3.2 Page 5 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott@zenovic.net 12067 CHRIS JAMES Desi "Results r d ®qc' 4-7: A ldo ved tRg'S i r COF, to ean 7 ss Member Reaction (lbs) 554 16' 9 1/2" 1183 Passed (47 1.00 1.0 D 1.0 L (All Spans) Shear (Ibs) 542 5 1/2" 1655 Passed (33 1.00 1.0 D 1.0 L (All Spans) Moment (Ft-Ibs) 2246 8' 7" 4215 Passed (53 1.00 1.0 D 1.0 L (All Spans) Live Load Defl. (in) 0.239 8' 7" 0.410 Passed (11823) 1.0 D 1.0 L (All Spans) Total Load Defl. (in) 0.299 8' 7" 0.821 Passed (11659) 1.0 D 1.0 L (All Spans) T3 -Pror" Rating 50 50 Passed F ®R T E 'w. MEMBER REPORT 2ND FLOOR FRAMING, Floor: Joist 1 piece(s) 11 7/8" TM® 230 16" OC 0 0 All Dimensions Are Horizontal;Drawing is Conceptual LL (L/480) and TL (L/240). Overall Length: 17' 17' Bracing (W): All compression edges (top and bottom) must be braced at 4' 11 3/8" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. A structural analysis of the deck has not been performed. Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser Edge" Panel (24" Span Rating) that is glued and nailed down. Additional considerations for the TJ-Pro" Rating include: 5/8" Gypsum ceiling. 1 Stud wall DF 2- Stud wall DF 5.50" 3.50" 4.25" 2.25" 1.75" 1.75" 114 112 458 449 572 561 1 1/4" Rim Board 1 1/4" Rim Board Rim Board is assumed to carry all loads applied directly above It, bypassing the member being designed. 1 Uniform(PSF) 0 to 17' 16" 0:90 10.0 u x -400 40.0 Residential Uving Areas 0 System Floor Member Type Joist Building Use Residential Building Code IBC Design Methodology ASD PASSED 'Membe�� STANDARD Weye eser Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design loads, dimensions and support Information have been provided by SRN SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:43 PM Forte v3.5, Design Engine: V5.5.3.2 Page 6 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic 8 Assoc. (360) 417 -0501 scott@zenooic.net 12067 CHRIS JAMES 'D Re iii Adua) [p�atloeli' iii;:Qi.ti Pie' s' Lc c m inabton'tIWI NfouP) Member Reaction (Ibs) 3894 2" 7656 Passed (51 1.0 D 0.75 L 0.75 S (All Spans) [1] Shear (Ibs) 3707 1' 1/2" 6400 Passed (58 1.15 1.0 D 0.75 L 0.75 S (All Spans) [1] Pos Moment (Ft -Ibs) 10225 3' 10868 Passed (94 1.15 1.0 D 0.75 L 0.75 5 (All Spans) [1] Live Load Defl. (in) 0.207 4' 5 7/8" 0.308 Passed (L/537) 1.0 D 0.75 L 0.75 S (All Spans) [1] Total Load Defl. (In) 0.341 4' 5 3/8" 0.463 Passed (1/325) 1.0 D 0.75 L 0.75 S (All Spans) [1] FORTE 0 MEMBER REPORT 2ND FLOOR FRAMING, Floor: Drop Beam 1 piece(s) 3 1/2" x 9" 24F -V4 DF Glulam 11 All Dimensions Are Horizontal;Drawing is Conceptual Deflection criteria: LL (L/360) and TL (L/240). Overall Length: 9' T Bracing (W): All compression edges (top and bottom) must be braced at 9' 7" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L 9' 3 The effect, of positive or negative camber have not been accounted for when calculating deflection. The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer. Applicable calculations are based on NDS 2005 methodology. 1 Uniform(PLF) 2 Point(lb) on 0to9'7" 3' N/A N/A X11 00 )1"44 15.0 2066 229.5/ -28.5 -19.5 3071 CAN Linked from: Floor: Joist W /CANT, Support 1 Linked from: Roof: RIDGE HEADER, Support 2 0 1 Stud wall DF 2 Stud wall DF 3.50" 3.50" 3.50" 3.50" ire& 1.78" 1.50" 1542 741 1100 137 1100 137 Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. 2037 847 4679/ -137 2688/ -137 Blocking Blocking jWeyeirhaeuser No Weyerhaeuser warrants that the sizing of Its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disdaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, Input design loads, dimensions and support information have been provided by SRH System Floor Member Type Drop Beam Building Use Residential Building Code IBC Design Methodology ASD PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:44 PM Forte v3.5, Design Engine: V5.5.3.2 Page 7 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 Scott @zenovic.net 12067 CHRIS JAMES ,DeS tgn:Restil r Act>aa1 1.9P.. Allowe d ,Result a '`,A LD Loa A Combinatlon �a"tbem f Member Reaction (lbs) 870 11' 3 1/4" 2790 Passed (31 1.00 1.0 D 1.0 L (All Spans) Shear (lbs) 435 11' 1/2" 1821 Passed (24 1.00 1.0 D 1.0 L (All Spans) Moment (Ft-lbs) -1104 11' 3 1/4" 4215 Passed (26 1.00 1.0 D 1.0 L (All Spans) Live Load Defl. (in) 0.058 15' 6" 0.211 Passed (L/868) 1.0 D 0.75 L 0.75 S (Alt Spans) Total Load Defl. (In) 0.111 15' 6" 0.423 Passed (L/456) 1.0 D 0.75 L 0.75 S (Alt Spans) TJ -Prot" Rating 64 50 Passed 0 R T E' MEMBER REPORT 2ND FLOOR FRAMING, Floor: Joist W /CANT 1 piece(s) 11 7/8" TNI® 230 16" OC O 0 All Dimensions Are Horizontal;Drawing is Conceptual Overall Length: 15' 6" 0 Defle ction critena: LL (1/4 80) an T L (1/240) F Overhang deflection criteria: 11 (21/480) and TL (21/240). Bracing (Lu): All compression edges (top and bottom) must be braced at 6' 9 5/16" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing Is required to achieve member stability. A structural analysis of the deck has not been performed. Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser Edger" Panel (24" Span Rating) that is glued and nailed down. Additional considerations for the TJ- Prot" Rating Include: 5/8" Gypsum ceiling. 1- Stud wall DF 2- Stud wall DF 3.50" 5.50" Arailable 2.25" 5.50" 1.75" 3.50" Di d 20 307 vex, 306/ -38 564 -26 93 326/ -64 964 1 1/4" Rim Board Blocking Rim Board is assumed to carry all loads applied directly above it, bypassing the member being designed. Blocking Panels are assumed to carry no loads applied directly above them and the full load Is applied to the member being designed. 1 Uniform(PSF) 2 Point(lb) 0to15'6" 15' 6" 16" N/A 090 10.0 120 49Kii 40.0 67 Residential Living Areas dell e STANDARD Weye user No Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible bp assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design Toads, dimensions and support Information have been provided by SRN System Floor Member Type Joist Building Use Residential Building Code IBC Design Methodology ASD PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:44 PM Forte v3.5, Design Engine: V5.5.3.2 Page 8 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott@zenovic.net 12067 CHRIS JAMES Design :Resul aca I on nn F a com n in ic on (Pattern)" Member Reaction (Ibs) 2003 2" 2461 Passed (81 1.0 D 1.0 S (All Spans) Shear (Ibs) 1526 1' 3 3/8" 4541 Passed (34 1.15 1.0 D 1.0 S (All Spans) Moment (Ft -Ibs) 4821 5' 1/2" 10263 Passed (47 1.15 1.0 D 1.0 S (All Spans) Live Load Dell. (in) 0.127 5' 1/2" 0.244 Passed (1/922) 1.0 D 1.0 S (All Spans) Total Load Defl. (in) 0.206 5' 1/2" 0.488 Passed (1/568) 1.0 D 1.0 S (All Spans) JFORTE 0 MEMBER REPORT 2ND FLOOR FRAMING, Floor: RIM 1 piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL All Dimensions Are Horizontal;Drawing is Conceptual Overall Length: 10' 1" Bracing (Lu): All compression edges (top and bottom) must be braced at 9' 5/16" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing Is required to achieve member stability. 1- Stud wall DF 2- Stud wall DF 4.:T 3.50" 3.50" �Availa'tile� 2.25" 2.25" Required 1.83" 1.83" Supports 785 785 1260 1260 2045 2045 1 1/4" Rim Board 1 1/4" Rim Board Rim Board is assumed to carry all loads applied directly above it bypassing the member being designed. 1 Uniforrn(PSF) 0to10'1" i :a 10' 15.0 25.0 )SY Residentlal Living Areas Weyerhaeuser ..t: s "'h=� 3 ;'`,ryx�.*3�.'?�u. s:Y �a`•?t� F yY x �r�' E 11 7 Weyerhaeuser warrants that the sizing of Its products wit be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, Input design loads, dimensions and support information have been provided by SRH 0 System Floor Member Type Flush Beam Building Use Residential Building Code IBC Design Methodology ASD PASSED Pl -t3r� 83 RIM AT SIDEWALL SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:44 PM Forte v3.5, Design Engine: V5.5.3.2 Page 9 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott@zenotic.net 12067 CHRIS JAMES SIgn,ReSW De -:s ti k1; e ..rc. i tAc�al,�tn®6onAll s �s x s. t-�' �IOF,waa com wnatlon Patorrn Member Reaction (Ibs) 2777 4" 4648 Passed (60 1.0 D 0.75 L 0.75 S (All Spans) Shear (Ibs) 2245 1' 5 3/8" 4541 Passed (49 1.15 1.0 D 0.75 L 0.75 S (All Spans) Moment (Ft -Ibs) 4326 4' 5 15/16" 8924 Passed (48 1.00 1.0 D 1.0 L (All Spans) Live Load Defl. (in) 0.105 4' 7 5/8" 0.221 Passed (L/999 1.0 D 0.75 L 0.75 S (All Spans) Total Load Defl. (in) 0.179 4' 7 1/2" 0.442 Passed (L/594) 1.0 D 0.75 L 0.75 S (All Spans) /FORTE" 0 All Dimensions Are Horizontal;Drawing is Conceptual D eflection criteria: LL (L/480) and TL (1/240). MEMBER REPORT 2ND FLOOR FRAMING, Floor: RIM /HEADER 1 piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL Overall Length: 9' 6" 0 Bracing (Lu): All compression edges (top and bottom) must be braced at 8' 10 11/16" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. 1 Stud wall DF 2 Stud wall DF 2g:To�l 5.50" 5.50" 4.25" 4.25" Magid fed 2.54" 1.88" 1176 844 1140 1140 1049 528 3365 2512 1 1/4" Rim Board 1 1/4" Rim Board Rim Board Is assumed to carry all loads applied directly above it, bypassing the member being designed. 1 Uniform (PLF) 2 Point(lb) 0to9'6" 2' N/A N/A 151.0 532 .Floor Giie 240.0 78.0 836 Residential Uving Areas 111b1tJ'' 11 RIM HEADER ON SIDE WALL eye rhaeiuser Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable fo y standards. The product application, Input design loads, dimensions and support Information have been provided by SRH 0 System Floor Member Type Flush Beam Building Use Residential Building Code IBC Design Methodology ASD PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:44 PM Forte v3.5, Design Engine: V5.5.3.2 Page 10 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott@zenovc.net 12067 CHRIS JAMES Design; Results` fia�wa� wtaltea e rtWC on l e,t�F, Member Reaction (Ibs) 1674 8' 7" 4922 Passed (34 1.0 D 1.0 L (Ali Spans) Shear (Ibs) 1381 1' 5 3/8" 7897 Passed (17 1.00 1.0 D 1.0 L (All Spans) Moment (Ft -Ibs) 4220 4' 17848 Passed (24 1.00 1.0 D 1.0 L (All Spans) Live Load Defl. (In) 0.045 4' 5 1/16" 0.206 Passed (L/999 1.0 D 0.75 L 0.75 S (All Spans) Total Load Defl. (In) 0.069 4' 5" 0.412 Passed (U999 1.0 D 0.75 L 0.75 S (Al Spans) FORTE 0 All Dimensions Are Horizontal;Drawing is Conceptual LL (L/4SU) an (L (LJ240). MEMBER REPORT 2ND FLOOR FRAMING, Floor: FLUSH BEAM 2 piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL Q Overall Length: 8' 9" Bracing (Lu): AII compression edges (top and bottom) must be braced at 8' 6 1/2" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. 1- Stud wall DF 2 Stud wall DF 5.50" varlalle 4.25" 3.50" 2.25" 1.50" 1.50" 617 546 1226 1160 409 327 2252 1 1/4" Rim Board 2033 1 1/4" Rim Board Rim Board is assumed to carry all loads applied d redly above it bypassing the member being designed. 1 Uniform(PSF) 2 Point(PLF) 0to8'9" 4' 6'21/16" 1' 10.0 525.0 40.0 226.5 736.5 Residential Living Areas Linked from: Floor: JOIST -BEAM, SuDDOrt 1 0 eyerhaeuser ta i Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not intended 10 circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design loads, dimensions and support information have been provided by SRH System Floor Member Type Flush Beam Building Use Residential Building Code IBC Design Methodology ASD PASSED Memberrr ABOVE KTICHEN SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:44 PM Forte v3.5, Design Engine: V5.5.3.2 Page 11 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott@zenovic.net 12067 CHRIS JAMES Des ignzResults actual w�tlon N(awea Resatc i. i LDF loaaycombi on (Pattern) 1P Member Reaction (Ibs) 6751 2" 7383 Passed (91 1.0 D 0.75 L 0.75 S (All Spans) Shear (Ibs) 6425 1'3 3/8" 13622 Passed (47 1.15 1.0 D 0.75 L 0.75 S (All Spans) Moment (Ft -Ibs) 29820 5' 30788 Passed (97 1.15 1.0 D 1.0 S (All Spans) Live Load Defl. (in) 0.298 6' 3/8" 0.306 Passed (1/493) 1.0 D 0.75 L 0.75 S (All Spans) Total Load Defl. (in) 0.524 6' 3/16" 0.613 Passed (1/281) 1.0 D 0.75 L 0.75 S (All Spans) Loads locaati T ributary idth Dead (a9o Flaor 1 Uniforn(PSF) 0 to 5' 6' 6" 10.0 40.0 Residential Living Areas 2 Uniforrn(PSF) 5' to 8' 8' 6" 10.0 40.0 3 Unifonn(PSF) 8' to 9' 6" 6' 6" 10.0 40.0 4 Uniform (PSF) 9' 6" to 12' 7" 3' 10.0 40.0 5 Point(lb) 5' N/A 3850 5809 Unked from: Roof: RIDGE BEAM, Support 1 '1FO R T E' 0 All Dimensions Are Horizontal;Drawing is Conceptual Deflection criteria: LL (1/480) and TL (L/240). MEMBER REPORT 2ND FLOOR FRAMING, Floor.: RIM/BEAM 3 piece(s) 1 3/4" x 11 7/8" 1.9E Microllam® LVL Overall Length: 12' 7" Bracing (Lu): All compression edges (top and bottom) must be braced at 3' 3/4" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing is required to achieve member stability. 0 1 Stud wall DF 2- Stud wall DF 3.50" 3.50" 2.25" 2.25" Required, 2.06" 1.50" 2863 1965 ve 1703 1358 3517 2292 8083 5615 1 1/4" Rim Board 1 1/4" Rim Board Rim Board is assumed to carry all loads applied directly above it, bypassing the member being designed. 1Neyelrhaetser Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. The product application, input design loads, dimensions and support information have been provided by SRH System Floor Member Type Flush Beam Building Use Residential Building Code IBC Design Methodology ASD Member BEAM AT END WALL WITH RIDGE POINT LOAD PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:55:44 PM Forte v3.5, Design Engine: V5.5.3.2 Page 12 of 13 Forte Software Operator Job Notes Scott Headrick Zenovic Assoc. (360) 417 -0501 scott @zenovic.net 12067 CHRIS JAMES ,--.v ,K„F;z, De51gn Results ,ra* nctua�� t ratio„ r Fs a�� -nz x as3 stes cnF Lam c mb "nabon .traae Member Reaction (Ibs) 1831 2" 7656 Passed (24 1.0 D 1.0 L (All Spans) Shear (Ibs) 1542 1' 2 3/4" 4725 Passed (33 1.00 1.0 D 1.0 L (All Spans) Moment (Ft -Ibs) 6831 7' 9 1/2" 6768 Passed (101 1.00 1.0 D 1.0 L (All Spans) Live Load Defl. (in) 0.310 7' 9 1/2" 0.508 Passed (L/590) 1.0 D 1.0 L (AII Spans) Total Load Defl. (In) 0.405 7' 9 1/2" 0.762 Passed (L/452) 1.0 D 1.0 L (All Spans) aFORTE 0 All Dimensions Are Horizontal; Drawing is Conceptual LL (LJ36 an (L/J40). MEMBER REPORT 2ND FLOOR FRAMING, Floor: HEAVY TIMBER BEAM 1 piece(s) 4 x 12 Douglas Fir -Larch No. 1 0 Overall Length: 15' 9" Bracing (W): All compression edges (top and bottom) must be braced at 6" o/c unless detailed otherwise. Proper attachment and positioning of lateral bracing Is required to achieve member stability. Applicable calculations are based on NDS 2005 methodology. 1 Stud wall DF 2 Stud waft DF r4TOta 3.50" 5.50" 3.50" 5.50" 1.50" 1.50" 428 438 1403 I433 1831 1871 Blocking Blocking Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. 1 Unifonn(PSF) 0 to 15' 9" 4' 6" 0.90 10.0 Floor Live 40.0 Residential Living Areas weye euser`P Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable for ebb y standards. The product application, Input design loads, dimensions and support information have been provided by SRI- CCU I2 (D Z 0 System Floor Member Type Drop Beam Building Use Residential Building Code IBC Design Methodology ASD PASSED SUSTAINABLE FORESTRY INITIATIVE 4/11/2012 2:20:48 PM Forte v3.5, Design Engine: V5.5.3.2 Page 1 of 1 S /23 P-t-A 2,9 Lab x.4-r-4 A 4571t i&S 6= 3 1 70 16 as (S,S) 6 „41 1 Z /IAA? ;744' /610= c .236D Z5.-)P0 12.5 .c- i a3Av 40°Vitli 4:1 JUN 1 2012 CITY OF PORT ANGELES BUILDING DIVISION 7"