Loading...
HomeMy WebLinkAbout1958ORDINANCE NO. ,/g5-g AN ORDINANCE amending Ordinance No. 1747 and 1890 to sewer connection fees and permit regulations. The City Council of the City of Port Angeles do ordain as follows: Section 1. Subsection A of Section 7 of Ordinance 930 (Port Angeles City Code Section 20.16(a) is hereby amended to read as follows: (a) Fees for permit for sewer connections (1) For each connection to an existing tee or wye to a public sanitary sewer or storm drain system (2) For each connection to a public sanitary sewer or storm drain system requiring the installation of a tee or wye (3) In addition roadway restoration permit fees in conjunction with sewer connec- tions shall be required as follows: aa. Installed on unimproved portions of street or alley bb. Installed on gravel street or gravelled alley cc. Installed on asphalt street or asphalt alley dd. Installed on a concrete street or concrete alley ee. Installed directly under a con- crete curb and /or gutter $15.00 Actual cost of install. No charge $75.00 $140.00 $200.00 $200.00 For the payment of said fee, it shall be the City's duty to do final surface restoration upon a suitable foundation of native material and /or crushed rock which has been approved by the City Engineer or his assistant and prepared by the owner or his con- tractor. These fees are based on the restoration costs for repairing a standard roadway utility cut. For the purpose of this Ordinance, the size of a standard roadway utility cut shall be defined to be: "No more than 48" wide and no more than one - half the roadway width in length." All improved roadway surfaces will be scored and cut in such a manner as to allow removal of the minimal amount of roadway • • surface without affecting the pavement surface outside the standard utility cut. Roadway cuts which require more roadway restoration than a standard roadway utility cut would be restored by the City with cost of the additional restoration being billed to the owner or contrac- tor requesting the sewer connection permit. At all times prior to the final restoration of a utility cut, it shall be the responsibility of the owner or contractor to protect the public's safety by properly barricading or marking all utility cut locations. (4) In the event of the installation of a sanitary sewer or storm drain system under a new local improvement district, no connection fee will be required if such connection is made to the new system within thirty days after the acceptance and approval of the work and system by the City Council and prior to any roadway preparation. PASSED by the City Council of the City of Port Angeles at a regular meeting of the Council held on the , 19 7 ATTEST City Clerk APPRO City Attorney PUBLISHED: day of