Loading...
HomeMy WebLinkAbout2210ORDINANCE NO. c2,...7/ AN ORDINANCE of the City of Port Angeles altering the rates for the sale of electricity; and amending Sections 3, 4, 6, and 9 of Ordinance 2054, Sections 3, 4, 6 and 9 of Ordinance 2137, Sections 1 and 2 of Ordinance 2173, Section 1 of Ordinance 219,,8��cc...�and Sections 13.12.030, 13.12.040, 15.12.060 and 13.12.090 of the Port Angeles Municipal Code. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO ORDAIN as follows: Section 1. Section 3 of Ordinance 2054, Section 3 of Ordinance 2137, and Section 13.12.030 of the Port Angeles Munici- pal Code are each amended to read as follows: 13.12.030 Schedule R2 - Residential Service. 1. Applicable to single phase electric service in residences (single family detached dwellings, duplexes, multifamily dwellings, apartments). 2. Rate: a. Basic Charge b. All kWh $5.00 $0.0211 per kWh Section 2. Section 4 of Ordinance 2137, Section 1 of Ordi- nance 2173, Section 1 of Ordinance 2198, Section 4 of Ordinance 2054, and Section 13.12.040 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.040 Schedule G2' -. General Service. 1. Applicable to govermental agencies, schools, churches, municipal and commercial accounts, multiple dwellings with a single meter, and all industrial accounts not included under Schedule IP and IT. 2. Rate: a. Basic Charge $10.00 b. Energy Charge: (i) 0 - 20,000 kWh $ 0.0198 per kWh (ii) All kWh over 20,000 $ 0.0124 per kWh c. Demand Charge: (i) 0 - 50 kW of billing demand: (ii) All kW over 50 kW of billing demand: no charge $3.45 per kW Section 3. Section 6 of Ordinance 2054, Section 6 of Ordi- nance 2137, and Section 13.12.060 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.060 Schedule IP2 - Industrial Primary. 1. This schedule is applicable to industrial, manufac- turing and processing plants where connected load is greater than 500 kilowatts. Energy delivered-Under this schedule shall be unregulated three phase, 60 cycle, A. C. at primary voltage. 2. Rate: a. Billing demand for the month shall be the highest of the maximum fifteen minute demand for the month or five hundred (500) kW. b. Demand Charge: December -May $4.10 per kW of billing demand June - November $2.72 per kW of billing demand c. Energy Charge: September -March $0.0097 per kWh April- August $0.0090 per kWh Section 4. Section 2 of Ordinance 2173 is amended to read as follows: Schedule IT2 - Industrial Transmission. 1. This schedule is applicable to industrial, manufactur- ingandprocessing plants, for energy delivered at trans- mission voltage, 69 kV, directly from the Bonneville Power Administration 69 kV Port Angeles Substation facilities. 2. Rate: a. Billing demand for the month shall be the maximum one hour demand for the month, for the hours of Monday through Saturday, 7:00 AM through 10:00 PM. b. Demand Charge: December -May $2.91 per kW of billing demand June - November $1.52 per kW of billing demand c. Energy Charge: September -March $0.0100 per kWh April- August $0.0095 per kWh Section 5. Section 9 of Ordinance 2054, Section 9 of Ordinance 2137, and Section 13.12.090 of the Port Angeles Munici- pal Code are each amended to read as follows: 13.12.090 Service Charges. The following service charges shall apply: (1) Installation and removal of temporary (2) Turn ons during regular working hours (8:00 AM to 4:30 PM): (3) Turn ons after regular working hours: (4) Service calls on customer's equipment (5) Service calls on customer's equipment after regular working hours: (6) Installation of new services: (7) Revision of existing services: service: $22.00 6.00 22.00 and meters: 11.25 and meters 40.00 24.00 24.00 Section 6. This ordinance shall take effect on 7724,1uot 1) /9'.Z PASSED by the City Council of the City of Port Angeles t a regular meeting of the Council held on the ad day f , 1982. • ATTEST: Marian C. Parrish, City Clerk APPROVED AS TO FORM: Craig Miller, CiT y Attorney • M ;' Y 0 R