HomeMy WebLinkAbout2637ORDINANCE NO. 2637 AN ORDINANCE of the City of Port Angeles altering the rates for the sale of electricity and establishing a separate rate classification for nonprofit tax - deductible organizations; amending Section 9 of Ordinance 2054, as most recently amended by Section 2 of Ordinance 2608; amending Section 3 of Ordinance 2608; amending Sections 13.12.040 and 13.12.041 of the Port Angeles Municipal Code; and adding a new Section 13.12.042 to the Port Angeles Municipal Code. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DOES ORDAIN as follows: Section 1. Section 9 of Ordinance 2054 as most recently amended by Section 2 of Ordinance 2608, and Section 13.12.040 of the Port Angeles Municipal Code, are each amended to read as follows: 13.12.040 Schedule GS -90 - General Service. A. Applicability. This schedule applies to all - residential accounts other than residential and nonprofit tax - deductible in Chaptcr 13.12 of the tort Angcle3 Municipal Codc, with a conncctcd load required transformer capacity below 100 KVA. Generally accepted utility standards provide that a 100 KVA transformer may serve a maximum total connected load of 165 KVA. B. Character of Service. Sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery. C. Rate: 1. Basic Charge a. b. Single phase Three phase $10.00 per month $25.00 per month 2. Monthly Energy charge: $0.0332 per kWh Section 2. Section 3 of Ordinance 2608, and Section 13.12.041 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.041 Schedule GD -90 - General Service Demand. A. Applicability. This schedule applies to all csidcntial accounts other than residential and nonprofit tax - deductible In Chapter 13.12 of the tort Angcic3 Municipal Codc, with a conncctcd load above required transformer capacity equal to or -1- greater than 100 KVA where the City owns the primary distribution system. Generally accepted utility standards provide that a 100 KVA transformer may serve a maximum total connected load of 165 KVA. B. Character of Service. Sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery. C. Rate: 1. Basic Charge: a. Single phase $10.00 per month b. Three phase $25.00 per month 2. Monthly Energy charge: $0.0230 per kWh 3. Billing Demand: a. Billing demand for each month shall be the maximum 15- minute demand for the month after adjustment for power factor. b. Monthly Demand Charge: $3.77 per KW 4. Time -of -Day Demand Metering Option. At the option of the customer, a time- of -dav demand meter is available. This meter restricts the hours to which the billing demand is charged to the hours of 7:00 AM to 10:00 PM, Monday through Saturday. The customer is responsible for the cost differential between the time -of -day demand meter and non - time - differentiated demand meter. This cost differential will be assessed on the customer's bill at the rate of $5.00 per month until the entire difference is repaid to the City. City Light will install, own, and maintain all metering devices. The rate per kW will remain the same as in Section C.3.b above. 45. Primary Metering Adjustment. When electric current is measured at primary voltage, meter readings shall be multiplied by a factor of 0.985 before charges are computed to reflect delivery to the customer at secondary voltage. 56. Power Factor Adjustments: If the average power factor at which power is delivered to the customer is less than 95% lagging, the billing demand may be increased by one percent of each percent or major fraction thereof that the average power factor is less than 95% lagging. The average power factor will be determined by measurement of kilowatt hours and reactive kilovolt- ampere hours during the billing period using the following formula: PF = kWh J(kWh)2 + (kvarh)2 Where PF = Average power factor Where kWh = Kilowatt hours Where kvarh = Reactive kilovolt- ampere hours -2- The metering reactive volt - ampere -hours shall be ratcheted to prevent reverse rotation when the power factor of the load is leading. Section 3. A new Section is added to Chapter 13.12 of the Port Angeles Municipal Code to read as follows: Section 13.12.042 Schedule NP -90 - Nonprofit Tax - Deductible. A. Applicability. This schedule applies to all nonprofit tax - deductible organizations. B. Character of Service. Sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery. C. Rate: 1. Basic Charge a. Single phase $10.00 per month b. Three phase $25.00 per month 2. Monthly Energy Charge: $0.0362 per kWh Section 4 - Severability. If any Section, subsection, paragraph, sentence, clause, or phrase of this Ordinance is declared unconstitutional or invalid for any reason, such decision shall not affect the validity of the remaining portions of this Ordinance. Section 5 - Effective Date. This Ordinance shall take effect June 1, 1991. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 7th day of May , 1991. kS-2cuzled: ATTEST; (t6-7A Y 0 R Becky J."p C1e Craig C t Cat rT� APPRO'' D AS TO FORM` Cr g nutson, City Attorney PUBLISHED: May 12, 1991 -3-