Loading...
HomeMy WebLinkAbout2875ORDINANCE NO. 2 8 7 5 AN ORDINANCE of the City of Port Angeles, Washington, altering the rates for the sale of electricity and amending Ordinance 2776 and Chapter 13.12 of the Port Angeles Municipal Code. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DOES HEREBY ORDAIN as follows: Section 1. Section 1 of Ordinance 2776 and Chapter 13.12.030 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.030 Schedule R -935 - Residential Service. A. Applicability. This schedule applies throughout the City for domestic uses in single - family residences, individual apartments or farms. Separately metered services incidental to single- family residential and farm service may be served under this schedule. B. Character of Service. Sixty cycle, alternating current, 120/240 volts nominal, single phase service will be furnished under this schedule, supplied through a single meter and one point of delivery. C. Rate: 1. Basic Charge $11.00 per month 2. Energy Charge $ 0.044-32 per kWh Section 2. Section 2 of Ordinance 2776 and Chapter 13.12.040 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.040 Schedule GS -935 - General Service. A. Applicability. This schedule applies to all accounts not covered by other rate schedules with the following types of service: 1. 120/208 or 120/240 volts, single or three phase, service panel of 400 amps or smaller. 2. 240/480 or 277/480 volts, three phase, service panel of 200 amps or smaller. B. Character of Service. Sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery. C. Rate: 1. Basic Charge a. Single phase $13.00 per month b. Three phase $32.00 per month 2. Monthly Energy charge: $ 0.04243 per kWh Section 3. Section 3 of Ordinance 2776 and Chapter 13.12.041 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.041 Schedule GD -935 - General Service Demand. A. Applicability. This schedule applies to all not covered by other rate schedules with the following types of service: 1. 120/208 or 120/240 volts, single or three phase, service panel larger than 400 amps. 2. 240/480 or 277/480 volts, three phase service panel larger than 200 amps. B. Character of Service. Sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery. C. Rate: 1. Basic Charge: a. Single phase $28.00 per month b. Three phase $69.00 per month 2. Monthly Energy charge: $ 0.0272 per kWh 3. Billing Demand: a. Billing demand for each month shall be the maximum 15- minute demand for the month after adjustment for power factor. b. Monthly Demand Charge: $3.874.04 per kW 4. Primary Metering Adjustment. When electric current is measured at primary voltage, meter readings shall be multiplied by a factor of 0.985 before charges are computed to reflect delivery to the customer at secondary voltage. 5. Power Factor Adjustments: If the average power factor at which power is delivered to the customer is less than 95 % lagging, the billing demand may be increased by one percent for each percent or major fraction thereof that the average power factor is less than 95 % lagging. The average power factor will be determined by measurement of kilowatt hours and reactive kilovolt- ampere hours during the billing period using the following formula: PF = kWh Where PF Where kWh Where kvarh (kWh)2 + (kvarh)2 Average power factor Kilowatt hours Reactive kilovolt- ampere hours The metering reactive volt - ampere -hours shall be ratcheted to prevent reverse rotation when the power factor of the load is leading. Section 4. Section 4 of Ordinance 2776 and Chapter 13.12.042 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.042 Schedule NP -935 - Nonprofit Tax - Deductible. A. Applicability. This schedule applies to all nonprofit tax- deductible organizations. B. Character of Service. Sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery. 2 l C. Rate: 1. Basic Charge a. Single phase b. Three phase 2. Monthly Energy Charge: $13.00 per month $32.00 per month $ 0.046384 per kWh Section 5. Section 5 of Ordinance 2776 and Chapter 13.12.060 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.060 Schedule PS -935 - Primary Service. A. Applicability. This schedule applies to all accounts which own and operate a primary voltage distribution system with a connected load greater than 1,000 KVA. B. Character of Service. Service to be furnished under this schedule is unregulated three phase, sixty cycle, alternating current at primary voltage, 12.5 KV nominal. Service under this schedule shall be provided and measured at the point(s) of interconnection of the distribution facilities of the customer and the City. C. Rate: 1. Basic Charge: $150.00 per month 2. Billing demand for the month shall be the maximum one -hour demand for the month, after adjustment for power factor. 3. Monthly Demand Charge: a. Heavy Load Period Demand Charges: The maximum one -hour demand occurring during the hours of 7:00 A.M. through 2:00 P.M., Monday through Saturday, after adjustment for power factor. All Months: $4.0622 per kW of billing demand b. Intermediate Load Period Demand Charges: The maximum one -hour demand in excess of heavy load demand which occurs during the hours of 2:00 P.M. through 10:00 P.M., Monday through Saturday, after adjustment for power factor. The maximum amount of demand available at this rate shall be limited to 20% of the actual demand occurring in the heavy load period, or two thousand kilowatts, whichever is greater. All Months: $2.0311 per kW of billing demand Demand greater than the above limits will be billed at the heavy load period rate. c. Light Load Period Demand Charges: The maximum one -hour demand occurring during the hours of 10:00 P.M. through 7:00 A.M. Monday through Saturday and all hours Sunday that is in excess of billing demand occurring during heavy load hours or intermediate load hours after adjustment for power factor. No Charge. 4. Monthly Energy Charge: a. September - March: $0.02456 per kWh b. April - August: $0.018390 per kWh 5. Power Factor Adjustments: If the average power factor at which power is delivered to the customer is less than 95 % lagging, the billing demand may be increased by one percent for each percent or major fraction thereof that the average power factor is less than 95 % lagging. The average power factor will be determined by measurement of kilowatt hours and reactive kilovolt- ampere hours during the billing period using the 3 1 following formula: PF = kWh Where PF Where kWh Where kvarh (kWh)2 + (kvarh)2 Average power factor Kilowatt hours Reactive kilovolt- ampere hours The metering reactive volt - ampere -hours shall be ratcheted to prevent reverse rotation when the power factor of the load is leading. Section 6. Section 6 of Ordinance 2776 and Chapter 13.12.071 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.071 Schedule IT -935 - Industrial Transmission. A. Applicability. This schedule applies to all accounts where power is taken at transmission voltage. B. Character of Service. Service to be furnished under this schedule is unregulated three phase sixty cycle, alternating current at transmission voltage, 69 KV nominal. Service under this schedule shall be provided and measured where the customer's facilities interconnect with the facilities of the City and the Bonneville Power Administration (BPA). C. Rate: 1. Basic Charge $1,842 per month 2. Coincidental demand shall be the demand for each customer covered under this rate schedule at the time of the City's system peak during peak load hours defined by the Bonneville Power Administration (BPA). BPA currently defines the peak load period as 7:00 A.M. through 10:00 P.M., Monday through Saturday. Coincidental demand will be adjusted for power factor less than 95 %. 3. Monthly Coincidental Demand Charge: $4.4462 per kw of coincidental demand. 4. Monthly Energy Charge: a. September - March: $0.02454 per kWh b. April - August: $0.018.18 per kWh 5. Power Factor Adjustments: If the average power factor at which power is delivered to the customer is less than 95 % lagging, the billing demand may be increased by one percent for each percent or major fraction thereof that the average power factor is less than 95 % lagging. The average power factor will be determined by measurement of kilowatt hours and reactive kilovolt- ampere hours during the billing period using the following formula: PF = kWh Where PF Where kWh Where kvarh (kWh)2 + (kvarh)2 Average power factor Kilowatthours Reactive kilovolt- ampere hours The metering reactive volt - ampere -hours shall be ratcheted to prevent reverse rotation when the power factor of the load is leading. 4 Section 7. Section 7 of Ordinance 2776 and Chapter 13.12.072 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.072 - Schedule L -935 - Li hg_ting. A. Applicability. This schedule applies to all approved unmetered yard and area lights. B. Installation. Yard or area lights are available upon request. Upon approval by the City Light Department, lights will be installed only on existing utility -owned poles for the use and convenience of customers. A one -year contract for service will be required before the light will be installed. Customer ownership of lighting is limited to existing lights only. C. Maintenance. The City Light Department retains ownership of the area lighting; maintenance of such lights shall be the responsibility of the City Light Department. D. Rate. 1. Lighting which remains in City Light Department ownership: a. 100 watts or less: $ 6.0025 per month b. More than 100 watts, but 150 watts or less: c. More than 150 watts, but 200 watts or less: d. More than 200 watts: 2. Lighting which remains in a. 100 watts or less: b. More than 100 watts, but 150 watts or less: c. More than 150 watts, but 200 watts or less d. More than 200 watts: $ $499.00 per month $ 9:3010.00 per month $11.0050 per month customer ownership (existing lights only): $ 4.5075 per month $ 5.0025 per month $ 5.3075 per month $ 7.508.00 per month Section 8. Section 8 of Ordinance 2776 and Chapter 13.12.073 of the Port Angeles Municipal Code are each amended to read as follows: 13.12.073 Schedule MW -935 - Municipal Water Pumping. A. Applicability. This schedule applies to municipal water pumping facilities where the connected load is greater than 500 KVA. B. Restrictions. Timers approved by the City Light Department shall be installed to prevent pumping during restricted hours as determined by the City Light Department. C. Character of Service. Service to be furnished under this schedule is three phase, sixty cycle, alternating current at available voltage. D. Rate: 1. Basic Charge: $136.00 per month 2. Billing demand for the month shall be the maximum 15- minute demand for the month, after adjustment for power factor. 3. Monthly Demand Charge: a. Demand occurring during the hours of 10:00 P.M. through 7:00 A.M., Monday through Saturday, and all hours Sunday, and other hours as approved by the City Light Department: No Charge, except when the power factor adjustment results in a 5 billing demand greater than actual demand, the difference shall be charged at the demand rates applicable for all other hours. b. All other hours: All Months: $4:905.10 per kW of billing demand 4. Monthly Energy Charge: a. September - March$0.0299311 per kWh b. April - August: $0.02456 per kWh 5. Power Factor Adjustments: If the average power factor at which power is delivered to the customer is less than 95 % lagging, the billing demand may be increased by one percent for each percent or major fraction thereof that the average power factor is less than 95 % lagging. The average power factor will be determined by measurement of kilowatt hours and reactive kilovolt- ampere hours during the billing period using the following formula: PF = kWh (kWh)2 + (kvarh)2 Where PF = Average power factor Where kWh = Kilowatt hours Where kvarh = Reactive kilovolt- ampere hours The metering reactive volt - ampere -hours shall be ratcheted to prevent reverse rotation when the power factor of the load is leading. Section 9 - Severability. If any provisions of this Ordinance, or its application to any person or circumstances, is held invalid, the remainder of the Ordinance, or application of the provisions of the Ordinance to other persons or circumstances, is not affected. Section 10 - Effective Date. This Ordinance shall take effect October 1, 1995. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 1s t day of Aug , 1995. ATTEST: Bitokyx.fixttprtert, City Cl Carol A. Hagar, D -uty PUBLISHED: August 6, 1995 95.14 MAYOR (J APPROVED AS TO FORM: d114:1!4 D. Knutson, City Aitorney Summaries of Ordinances Adopted by the Port Angeles City Council on August l , 1995 Ordinance No. 2875 This Ordinance of the City of Port Angeles alters the rates for the sale of electricity and amends Ordinance 2776, as amended, and Chapter 13.12 of the Port Angeles Municipal Code. Ordinance No. 2876 This Ordinance of the City of Port Angeles rezones 5.37 acres of land located on Eighteenth Street west of "N" Street from RS -9, Residential Single - Family, to RMD, Residential Medium Density, and amends the Official Zoning Map. Ordinance No. 2877 This Ordinance of the City of Port Angeles establishes a plan and system for Capital Improvements; authorizes the issuance of a series of electric revenue bonds in the principal amount of $2,760,000 to finance a portion of the City's electric utility capital improvement program; and authorizes the sale of such bonds by competitive bid. Ordinance No. 2878 This Ordinance of the City of Port Angeles revises the requirements for disposal of surplus real and personal property and amends Ordinance 2168 as amended, and Chapter 2.50 of the Port Angeles Municipal Code. The full texts of the Ordinances are available at City Hall in the City Clerk's office or will be mailed upon request. Office hours are Monday through Friday from 8:00 a.m. to 5:00 p.m. These Ordinances shall take effect five days after the date of publication of these summaries. Publish: August 6, 1995 Becky J. Upton City Clerk