Loading...
HomeMy WebLinkAbout2924ORDINANCE NO. 2924 AN ORDINANCE of the City of Port Angeles, Washington, providing for special "pass through" power rates from the Bonneville Power Administration for industrial customers and amending Ordinance 2173 as amended and Chapter 13.12 of the Port Angeles Municipal Code. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DOES HEREBY ORDAIN as follows: Section 1. Section 2 of Ordinance 2173 as amended and PAMC 13.12.071 are hereby amended to read as follows: 13.12.071 Schedule IT -95 - Industrial Transmission. A. Applicability. This schedule applies to all accounts where power is taken at transmission voltage. B. Character of Service. Service to be furnished under this schedule is unregulated three phase sixty cycle, alternating current at transmission voltage, 69 KV nominal. Service under this schedule shall be provided and measured where the customer's facilities interconnect with the facilities of the City and the Bonneville Power Administration (BPA). C. Rate: 1. Basic Charge $1,842 per month 2. Coincidental demand shall be the demand for each customer covered under this rate schedule at the time of the City's system peak during peak load hours defined by the Bonneville Power Administration (BPA). BPA currently defines the peak load period as 7:00 A.M. through 10:00 P.M., Monday through Saturday. Coinci- dental demand will be adjusted for power factor less than 95 %. 3. Monthly Coincidental Demand Charge: $4.62 per kw of coincidental demand. 4. Monthly Energy Charge: a. September - March: $0.0254 per kWh b. April - August: $0.0188 per kWh 5. Power Factor Adjustments: If the average power factor at which power is delivered to the customer is less than 95% lagging, the billing demand may be increased by one percent for each percent or major fraction thereof that the average power factor is less than 95% lagging. The average power factor will be determined by measurement of kilowatt hours and reactive kilovolt - ampere hours during the billing period using the following formula: PF = kWh (kWh) 2 + (kvarh) 2 Where PF = Average power factor Where kWh = Kilowatt hours Where kvarh = Reactive kilovolt- ampere hours The metering reactive volt - ampere -hours shall be ratcheted to prevent reverse rotation when the power factor of the load is leading. D. Special "Pass- Through" Rates: The industrial transmission rate schedule may be modified pursuant to special contractual arrangements with BPA whereby BPA makes available reduced wholesale power on a special "pass- through" arrangement to meet the unique circumstances of a particular industrial customer, provided that any such special rate shall take effect no sooner than July 1, 1996. Section 2 - Effective Date. This Ordinance shall take effect five days after the date of publication. PASSED by the City Council of the City of Port Angeles at a regular meeting of said C•. held on the 16th day of July 1996. ATTEST: APPROVED AS TO FORM: Craig D. Knutson, City Attorney July 21, 1996 Y O R Summaries of Ordinances Adopted by the Port Angeles City Council on July 16, 1996 Ordinance No. 2924 This Ordinance of the City of Port Angeles provides for special "pass through" power rates from the Bonneville Power Administration for industrial customers, amends Ordinance 2173 as amended, and Chapter 13.12 of the Port Angeles Municipal Code. The full text of the Ordinance is available, for a fee, at City Hall in the City Clerk's office or will be mailed upon request. Office hours are Monday through Friday from 8:00 a.m. to 5:00 p.m. This Ordinance shall take effect five days after the date of publication of this summary. Publish: July 21, 1996 Becky J. Upton City Clerk l