Loading...
HomeMy WebLinkAbout3200ORDINANCE NO. 3200 AN ORDINANCE of the City of Port Angeles, Washington, amending building permit fees to allow credits for fire sprinkler systems, and amending Chapter 3.70 of the Port Angeles Municipal Code. THE CITY COUNCIL OF THE CITY OF PORT ANGELES do hereby ordain as follows: Section 1. Chapter 3.70 of the Port Angeles Municipal Code is hereby amended by amending PAMC 3.70.080 to read as follows: 3.70.080 Building. Mechanical, Plumbing, and Sign Permit Fees. A. Building Permit fees shall be according to the following schedule: Total Valuation Fee $1.00 to $500.00 $50.00 $501.00 to $2,000.00 $50.00 for the first $501.01 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00. $2,001.00 to $25,000.00 $92.75 for the first $2001.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00. $25,001.00 to $100,000.00 $667.25 for the first $50,001.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $1,017.25 for the first $100,001.00 plus $5.60 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 to $1,000,000.00 $3,257.25 for the first $500,001.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00. -1- $1,000,001.00 and up $5,632.75 for the first $1,000,001.00 plus $3.65 for each additional $1,000.00 or fraction thereof. An applicant for a building permit shall have a $500.00 credit, to be applied against the above fees, when a fire sprinkler system approved by the Fire Department, is installed in a single family residence or duplex within the City. An applicant for a building permit shall have a $200.00 per unit credit, to be applied against the above fees, when a fire sprinkler system approved by the Fire Department, is installed in a multi - family building within the City, provided the maximum credit for a multi - family building shall be $3,000.00. Other Inspections and Fees: 1. Inspections outside of normal business hours 2. Reinspection fees assessed under provisions of Section 305.8 3. Certificate of occupancy inspection 4. Inspections for which no fee is specifically indicated 5. Surcharges enacted pursuant to Chapter 19.27 RCW and remitted to the State Treasurer shall be: 6. The fee for plan review shall be as follows: a. Residential: 40% of the building permit fee. b. Commercial: 65% of the building permit fee. Additional plan review required by changes, additions or revisions to plans. 7. For use of outside consultants for plan checking and inspections, or both. 8. The permit fee for the installation of a manufactured or mobile home. $65.00 per hour' (min. charge - two hours). $50.00 per hour' $50.00 $50.00 per hour'. (min. charge - one -half hour). $4.50 for each building permit, plus $2.50 for each additional residential unit. $50.00 per hour'. (min. charge - one -half hour). Actual Costs2 $230.00 'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. 2Actual costs include administrative and overhead costs. -2- B. Mechanical permit fees shall be according to the following schedule: Permit Issuance 1. For the issuance of each permit 2. For issuing each supplemental permit for which the original permit has not expired or been canceled or finaled. Unit Fee Schedule Note: The following do not include permit- issuing fees. 1. Furnaces For the installation or relocation of each forced -air or gravity type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29.3 kW) $50.00 $7.25 $14.80 For the installation or relocation of each forced -air gravity type furnace or burner, including ducts and vents attached to such appliance, over 100,000 Btu/h (29.3 kW) $18.20 For the installation or relocation of each floor furnace, including vent. $14.80 For the installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $14.80 2. Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. 3. Repairs or Additions For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls by this code. 4. Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including three (3) horsepower, or each absorption system to and including 100,000 Btu/h (29.3 kW) For the installation or relocation of each boiler or compressor over (3) horsepower (2.24 kW) to and including 15 horsepower (11.19 kW), or each absorption system over 100,000 Btu/h (29.3 kW) and including 500,000 Btu/h (146.48 kW) $7.25 $13.70 $14.70 $27.15 For the installation or relocation of each boiler or compressor over 15 horsepower (11.19 kW) to and including thirty (30) horsepower (22.37 kW), or each absorption system over 500,000 Btu/h (146.48 kW) to and including 1,000,000 Btu/h (29.2 kW) $37.25 For the installation or relocation of each boiler or compressor over thirty (30) horsepower (22.37 kW) to and including fifty (50) horsepower (37.3 kW), or for each absorption system over 1,000,000 Btu/h (292.95 kW) to and including 1,750,000 Btu/h (512.66 kW) For the installation or relocation of each boiler or compressor over fifty (50) horsepower (37.3 kW), or each absorption system over 1,750,000 Btu/h (512.66 kW) 5. Air Handlers $55.45 $92.65 For each air - handling unit to and including 10,000 cfin (4.72m3/S), including ducts attached thereto $10.65 Note: This fee shall not apply to an air - handling unit which is a portion of a factory - assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. 6. Evaporative Coolers For each air - handling unit over 10,000 cfrn (4.72m3/S) For each evaporative cooler other than portable type 7. Ventilation and Exhaust For each ventilation fan connected to a single duct $18.10 $10.65 $7.25 For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit $10.65 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood. 8. Incinerators $10.65 For the installation or relocation of each domestic -type incinerator $18.20 -4- For the installation or relocation of each commercial or industrial -type incinerator $14.50 9. Miscellaneous For installation of a solid -fuel burning appliance. $50.00 For each appliance or piece of equipment regulated by this code, but not classed in other appliance categories, or for which no other fee is listed in this table. $10.65 10. When Chapter 13 in Appendix B is applicable (See Section 103.0) permit fees for fuel gas piping shall be as follows: For each gas piping system of one to five outlets $10.65 For each additional as piping system, per outlet. $5.00 11. Process Piping For each hazardous process piping system (HPP) of one to four outlets $10.65 For each HPP piping system of five or more outlets, per outlet $15.00 For each nonhazardous process piping system (NPP) of one to four utlets. $10.65 For each NPP piping system of five or more outlets, per outlet $15.00 Other Inspections and Fees 1. Inspections outside of normal business hours, per hour $47.00 (minimum charge - two hours) 2. Reinspection fees assessed under provisions of Section 116.7, per inspection $70.50 3. Inspections for which no fee is specifically indicated, per hour $47.00 (minimum charge - one -half hour) 4. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed, per hour. $47.00 -5- (minimum charge - one -half hour) C. Plumbing permit fees shall be according to the following schedule: Permit Issuance 1. For the issuance of each permit $47.00 2. For issuing each supplemental permit Unit Fee Schedule (in addition to items 1 and 2 above) $10.00 1. For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping and backflow protection therefor $7.00 2. For each building sewer and each trailer park sewer $15.00 3. Rainwater systems - per drain (inside building) $7.00 4. For each cesspool (where permitted) $25.00 5. For each private sewage disposal system $40.00 6. For each water heater and/or vent $7.00 7. For each gas - piping system of one to five outlets $5.00 8. For each additional gas piping system outlet, per outlet. $1.00 9. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen -type grease interceptors functioning as fixture traps $7.00 10. For each installation, alteration or repair of water piping and/or water treating equipment, each $7.00 11. For each repair or alteration of drainage or vent piping, each fixture $7.00 12. For each lawn sprinkler system on any one meter including backflow protection devices therefor. $7.00 -6- 13. For atmospheric -type vacuum breakers not included in item: 1 to 5 Over 5 $5.00 $1.00 14. For each backflow protective device other than atmospheric type vacuum breakers: 2 inch (51 mm) diameter and smaller $7.00 over 2 inch (51mm) diameter $15.00 15. For each graywater system $40.00 16. For initial installation and testing for a reclaimed water system $30.00 17. For each annual cross - connection teting of a reclaimed water system (excluding initial test) $30.00 18. For each medical gas piping system serving one to five inlet(s) /outlet(s) for a specific gas 19. For each additional medical gas inlet(s) /outlet(s) Other Inspections and Fees $50.00 $5.00 1. Inspection outside of normal business hours, per hour $94.00 2. Reinspect on fee $70.50 3. Inspections for which no fee is specifically indicated $50.00 4. Additional plan review required by changes, additions or revisions to approved plans (minimum charge - one -half hour) $50.00 D. Sign permit fees shall be according to the following schedule: Type of Sign Fee Wall or marquees, over 25 sq. ft. $ 85.00 Freestanding and projecting, over 25 sq. ft. $115.00 All signs less than 25 sq.ft. $47.00 Supergraphic on building (any size) $47.00 Section 2 - Severability. If any section, subsection, sentence, clause, phrase or word of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality thereof shall not affect the validity or constitutionality of any other section, subsection, sentence, clause, phrase or word of this ordinance. Section 3 - Effective Date. This Ordinance shall take effect five days following the date of its publication by summary. Section 4 - Corrections. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of the scrivener's /clerical errors, references, ordinance numbering, section/subsection numbers and any references thereto. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 17th day of May, 2005. ATTEST: APP OVED AS TO FO �r Becky J. U I , '� Clerk William E. Bloor, City Attorney PUBLISHED: May 22, 2005 By Summary G:\Legal_ Backup \ORDINANCES& RESOLUTIONS\ 2005- 14. FeesOrdinance- 370080.051005.wpd (May 10, 2005) _g_ Summaries of Ordinances Adopted by the Port Angeles City Council on May 17, 2005 Ordinance No. 3199 This Ordinance of the City of Port Angeles, Washington, revises certain Fire Department inspection fees specifically related to the inspection of marine fueling operations, and amends Chapter 3.70 of the Port Angeles Municipal Code. Ordinance No. 3200 This Ordinance of the City of Port Angeles, Washington, amends building permit fees to allow credits for fire sprinkler systems, and amends Chapter 3.70 of the Port Angeles Municipal Code. The full texts of the Ordinances are available at City Hall in the City Clerk's office or will be mailed upon request. Office hours are Monday through Friday from 8:00 a.m. to 5:00 p.m. These Ordinances shall take effect five days following the date of publication by summary. Becky J. Upton, CMC City Clerk Publish: May 22, 2005