Loading...
HomeMy WebLinkAbout3348• • ORDINANCE NO. 3348 AN ORDINANCE of the City of Port Angeles, Washington, revising Chapter 3.70 and Chapter 14.05 of the Port Angeles Municipal Code relating to Electrical Code Inspection and Permit Fees. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN AS FOLLOWS: Section 1. Ordinance 3085, as amended, and Chapter 3.70 of the Port Angeles Municipal Code are hereby amended by amending PAMC 3.70.110 subpart P to read as follows: 3.70.110 - Public Works & Utilities Department Fees and Deposits. P. Electric Utility Fees. 1. Inspcction & RevicwElectrical Work Permits and Fees. The fees for electrical inspections performed by the City • • feeders shall be as follows. set forth m the-current cdrtion of the Statc of Washmgton Department of Cahn and Indttstrics fec as- adopted in WAC 296 -46 -910 as amended. a. Service /feeder 200 amp. $93.75 b. Service /feeder 201 -400 amp. $113.75 c. Service /feeder 401 -600 amp. $160.00 d. Service /feeder 601 -1000 amp. $205.00 e. Service /feeder over 1000 amp. $291.25 f. Branch circuit with service feeder $2.00 • Branch circuit without service feeder $57.50 h. Each additional branch circuit $2.00 i. Temporary service /feeder 200 amp. $72.50 Temporary service /feeder 201 -400 amp. $86.25 k. Temporary service /feeder 401 -600 amp. $116.25 1. Temporary service /feeder 601 -1000 amp. $131.25 m. Hourly inspection fee $75.00 as authorized by the Public Works and Utilities Director. n. Sign/outline lighting $69.00 o. Signal circuit /limited energy - commercial first 1500 square ft. $75.00 • Each additional 1500 square ft. or portion of commercial $75.00 • Signal circuit/limited energy -1 & 2 family dwellings $50.00 r. Si • nal circuit/limited energy -multi family dwellings $50.00 s. Manufactured home connection $93.75 -1- • • t. Renewable electrical energy -5 KVA system or less $80.00 u. Single and multi - family dwellings first 1300 square ft. $86.25 v. Each additional 500 square ft. or portion of single or multi- family dwelling $27.50 w. Each outbuilding or detached garage $57.50 x. Each swimming pool or hot tub $86.25 Low - voltage thermostat $43.75 z. Each carnival ride and generator truck $20.00 aa. Each remote distribution equipment, concerts or gaming show $6.25 bb. First field inspection each year or a single concession or ride, not part of a carnival $86.25 cc. Subsequent inspection of a single concession or ride, not part of a carnival $57.50 dd. Berth at a marina or dock $57.50 ee. Each additional berth inspected at the same time $38.25 ff. Industrial block permit $1,000.00 Trip fees and penalties $43.75 as authorized by the Public Works and Utilities Director hh. Requests by property owners to inspect existing installations $86.25 2. Pole Attachment Rate. The pole attachment rate shall be $11.50 per contact. as follows. car .J 3. Connects /Disconnects The fee for special emergency connects or disconnects shall be $80.00 during regular working hours and $140.00 outside of regular hours Section 2. Ordinance 2552, as amended, and Chapter 14.05 of the Port Angeles Municipal Code are hereby amended by amending 14.05.180 PAMC to read as follows: 14.05.180 Inspection and Permit Fees. A. The fees for electrical work permitsinspections shall be as set forth in 19.28.210 Chapter 3.70 PAMC. B. Block Permit. A firm, corporation, or other entity which that has a regularly employed electrical maintenance staff, which is exempted from the requirement to have an electrician certificate of competency by RCW 19.28.610, may choose to purchase an a $250 bi- annual electrical work permit for work done by in -house electrical personnel rather than a work permit for each installation or alteration in accordance with this Section. Work done by contractors shall not be included in this block permit. The Inspector will track work requested under the block permit until $250.00 an equivalent worth of work is reached, after which additional fees will be charged. - 2 - • C. A fee of two times the regular permit fee shall be charged for work that was started without a permit. This provision shall not apply to emergency work, when at the satisfaction of the Inspector such work was urgently necessary, making it impractical to obtain a permit prior to commencing the work. A permit must be obtained within forty -eight (48) hours after the start of such work. Section 3 - Severability. person or circumstances is held to the provisions of the Ordinance to Section 4 - Corrections. If any provisions of this Ordinance or its applications to any be invalid, the remainder of the Ordinance or application of other persons or circumstances is not affected. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of the scrivener's /clerical errors, references, ordinance numbering, section/subsection numbers and any references thereto. Section 5 - Effective Date. This ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum. This ordinance shall take effect January 1, 2009. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 21st day of October, 2008. ATTEST: Becky J. ton, City Clerk PUBLISHED: October 26 , 2008 By Summary }01 @iL-1\‘-4-.—A-17 OR APPROVED AS TO FORM: William E. Bloor, City Attorney G:\Le8al_ Backup\ ORDINANCES &RESOLUTIONS \ORDINANCES.2008\38 - PW Fees.093008.wpd October 10, 2008 - 3 - Summaries of Ordinances Adopted by the Port Angeles City Council on October 21, 2008 Ordinance No. 3344 This Ordinance of the City of Port Angeles, Washington, amends Chapter 3.70 of the Port Angeles Municipal Code relating to fees for use of William Shore Memorial Pool. This Ordinance shall take effect five days following the date of its publication by summary. Ordinance No. 3345 This Ordinance of the City of Port Angeles, Washington, revises Chapter 13.54 of the Port Angeles Municipal Code relating to Solid Waste Collection Rates. This Ordinance shall take effect January 1, 2009. Ordinance No. 3346 This Ordinance of the City of Port Angeles, Washington, revises Chapter 13.57 of the Port Angeles Municipal Code relating to Solid Waste Processing Facility Rates. This Ordinance shall take effect January 5, 2009. Ordinance No. 3347 This Ordinance of the City of Port Angeles, Washington, revises Chapters 13.10 and 13.12 of the Port Angeles Municipal Code relating to Electricity — Service and Charges. This Ordinance shall take effect January 1, 2009. Ordinance No. 3348 This Ordinance of the City of Port Angeles, Washington, revises Chapter 3.70 and Chapter 14.05 of the Port Angeles Municipal Code relating to Electrical Code Inspection and Permit Fees. This Ordinance shall take effect January 1, 2009. The full texts of the Ordinances are available at City Hall in the City Clerk's office or will be mailed upon request. Office hours are Monday through Friday from 8:00 a.m. to 5:00 p.m. Becky J. Upton, MMC City Clerk Publish: October 26, 2008