HomeMy WebLinkAbout3445•
•
ORDINANCE NO. 3 4 4 5
AN ORDINANCE of the City of Port Angeles, Washington, relating to
Electricity Services and Charges; adding a new section 3.12.074 to
Chapter 13.12 of Title 13 of the Port Angeles Municipal Code.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN
AS FOLLOWS:
Section 1. Title 13 of the Port Angeles Municipal Code is amended by adding a
new Section 13.12.074 to Chapter 13.12 to read as follows:
Chapter 13.12
Sections:
13.12.010
13.12.020
13.12.021
13.12.025
13.12.030
13.12.040
13.12.041
13.12.042
13.12.043
13.12.060
13.12.071
13.12.072
13.12.073
13.12.074
13.12.080
13.12.100
13.12.110
ELECTRICITY - SERVICES AND CHARGES
General Provisions Applicable to All Service.
Uniform Electric Rate.
Point of Delivery.
Rate Class Assignment.
Schedule R -03 - Residential Service.
Schedule GS -03 - General Service.
Schedule GD -03 - General Service Demand.
Schedule NP -03 - Nonprofit Tax - Deductible.
Schedule GD -04 - General Service Demand — Primary Metered.
Schedule PS -03 - Primary Service.
Schedule IT -03 - Industrial Transmission.
Schedule L -03 - Lighting.
Schedule MW -03 - Municipal Water Pumping.
New or Expanded Loads
Contract Sales and Purchases.
Electrical Work Permits and Fees.
Contract and Administration Charge.
•
•
13.12.074 New or Expanded Loads
A. Definitions. For purposes of this section, the following definitions apply:
"New Load" means a General Service Demand or Primary Service account that is first
connected to the electrical distribution system after December 31, 2012 and that is equal to or
exceeds 2 MW.
"Expanded Load" means a General Service Demand or Primary Service account previously
connected to the electric distribution system that is increased in an amount equal to or
exceeding 1 aMW when compared to the customer's monthly energy and demand consumption
in the same calendar month in calendar year 2011.
A New Load can also have an Expanded Load component subject to this section.
B. Applicability. Subject to the exclusions stated in the following two paragraphs,
this section applies to all New Loads and all Expanded Loads.
This section is intended to establish rates only for sales of Tier 2 power. The rates established
in this section do not apply to the extent Tier 1 power is available to serve all or a portion of the
New Load or Expanded Load. This section does not apply to loads designated by the City or the
Bonneville Power Administration as New Large Single Loads as defined by the Bonneville
Power Administration in their New Large Single Load Policy document, dated April 2001.
This section also does not apply to loads that are served under Section 13.12.071 of Title 13 of
the Port Angeles Municipal Code.
Except as provided in paragraph C. 2. below, sections 13.12.041, 13.12.043, and 13.12.060 do
not apply to New Loads and do not apply to the portion of any load that is an Expanded Load.
C. New Loads. After December 31, 2012, a New Load shall be charged the
following rates and charges based on the energy and demand usage for each month as measured
by the account meter.
1. Uniform Rate. New Loads will be charged the cost of generation and
transmission services incurred for such service by the City from the Bonneville Power
Administration under the Priority Firm Public Rate, Tier 2 Charges, including without
limitation the charges for Unanticipated Load Service as defined in the BPA Administrator's
Record of Decision for the BP -12 Rate Adjustment Proceeding and the 2012 Power Rate
Schedules and General Rate Schedule Provisions (FY2012- 2013). The City in its sole
discretion shall have the right to determine what Tier 2 rate alternatives it procures from the
Bonneville Power Administration.
2. Basic Charge. A basic charge in accordance with Section 13.12.041,
13.12.043, or 13.12.060 of this Chapter shall apply to New Loads.
-2-
•
•
3. Distribution Charge. A distribution charge determined by multiplying 0.40
times the sum of items 1 -2 shall apply to New Loads.
D. Expanded Loads. After December 31, 2012, any customer with an Expanded
Load shall be charged on the Expanded Load the following rates and charges based on the
energy and demand usage for each month as measured by the account meter.
1. Uniform Rate. The customer's monthly energy and demand consumption in
excess of its energy and demand consumption in the same calendar month in calendar year 2011
will be charged the cost of generation and transmission services incurred for such service by the
City from the Bonneville Power Administration under the Priority Firm Public Rate, Tier 2
Charges, including without limitation the charges for Unanticipated Load Service. The City in
its sole discretion shall have the right to determine what Tier 2 rate alternatives it procures from
the Bonneville Power Administration.
The customer's monthly energy and demand consumption that is equal to or less than its energy
and demand consumption in the same calendar month in calendar year 2011 shall be charged as
determined by the Director in accordance with Section 13.12.041, 13.12.043, or 13.12.060 of
this Chapter.
E. Other Applicable Charges and Adjustments. The following charges and
adjustments shall be applied to any New Load or any Expanded Load served under this
schedule.
1. Diurnally Differentiated Rate. If the City can procure power from the
Bonneville Power Administration under the Priority Firm Public Rate, Tier 2 Charges, with
deliveries differentiated diurnally, the City may in its sole discretion offer service hereunder
that is diurnally differentiated.
2. Adjustments to Rate. The City may reduce the rate applicable to a New Load
and/or an Expanded Load under this schedule, as a part of the annual budget process or at such
other time as the City deems appropriate, if the City determines in its sole discretion, by use of
a cost of service analysis or other accepted econometric methods, that the economic impact
within the City of the New Load and/or Expanded Load will generate additional revenues for
the City such that an adjustment to the rate applicable to a New Load and/or an Expanded Load
under this schedule will not increase result in shifting service costs to other City electric
customers.
3. Transmission Charges. The monthly wholesale transmission costs to the City,
including energy, demand and any other charges incurred by the City to provide service to an
account for a New Load or an Expanded Load under this schedule.
-3-
•
•
4. Charges and Credits. Any other wholesale generation or transmission charges
or credits accrued by the City to provide service to a New Load or an Expanded Load under this
schedule.
5. Taxes. An amount calculated to recover the actual tax obligation of the Electric
Utility and City for State Public Utilities tax and City Public Utility tax and any other applicable
taxes.
Section 2 - Corrections. The City Clerk and the codifiers of this ordinance are
authorized to make necessary corrections to this ordinance including, but not limited to, the
correction of the scrivener's /clerical errors, references, ordinance numbering,
section/subsection numbers and any references thereto.
Section 3 - Severability. If any provisions of this Ordinance, or its application to
any person or circumstances, are held invalid, the remainder of the Ordinance, or application of
the provisions of the Ordinance to other persons or circumstances, is not affected.
Section 4 - Effective Date. This Ordinance, being an exercise of a power
specifically delegated to the City legislative body, is not subject to referendum. This
ordinance shall take effect five (5) days after passage and publication of an approved summary
thereof consisting of the title.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said
Council held on the 7th day of February , 2012.
ATTEST:
a Hurd, City Clerk
PUBLISHED: February 12 2012
By Summary
-4-
MAYOR, CHERI KIDD
APPROVED AS TO F
William E. Bloor, City Attorney
•
Summary of Ordinance Adopted by the
Port Angeles City Council
On February 7, 2012
Ordinance No. 3445
This Ordinance of the City of Port Angeles, Washington, relating to Electricity Services and
Charges; adds a new section 3.12.074 to Chapter 13.12 of Title 13 of the Port Angeles
Municipal Code.
The full texts of the Ordinances are available at City Hall in the City Clerk's office, on the City's
website at www.cityofpa.us, or will be mailed upon request. Office hours are Monday through
Thursday, 8:30 a.m. to 4:00 p.m., and Friday 8:30 a.m. to 12:30 p.m. These Ordinances shall
take effect five days following the date of publication by summary.
Publish: February 12, 2012
•
Janessa Hurd
City Clerk