Loading...
HomeMy WebLinkAbout3452• ORDINANCE NO. 3452 AN ORDINANCE of the City of Port Angeles, Washington, relating to electricity services and charges making changes to Chapter 13.12 of Title 13 of the Port Angeles Municipal Code. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN AS FOLLOWS: Section 1. Ordinances 2054 as amended, and Title 13 of the Port Angeles Municipal Code Chapter 13.12 is amended to read as follows: CHAPTER 13.12 - ELECTRICITY — SERVICES AND CHARGES 13.12.010 - General provisions applicable to all services. 13.12.015 - Time of use electric rate 13.12.020 - Uniform electric rate. 13.12.021 - Point of delivery. 13.12.025 - Rate Class assignment. 13.12.030 - Schedule R -03- Residential service. 13.12.031 - Schedule R -03- Residential service time of use rate. 13.12.040 - Schedule GS- 03- General service. 13.12.0401.Schedule GS- 03- General service time of use rate. 13.12.041 - Schedule GD- 03- General service demand. 13.12.0411.Schedule GD- 03- General service demand time of use rate. 13.12.042 - Schedule NP- 03- Nonprofit tax - deductible. 13.12.0421. Schedule NP- 03- Nonprofit tax - deductible time of use rate. 13.12.043 - Schedule GD- 04- General service demand - primary metered. 13.12.044 - Schedule GD- 04- General service demand - primary metered time of use rate. 13.12.060 - Schedule PS -03- Primary service. 13.12.061 - Schedule PS -03- Primary service time of use rate. 13.12.071 - Schedule IT- 03- Industrial transmission. 13.12.072 - Schedule L- 03- Lighting. 13.12.073 - Schedule MW -03- Municipal water pumping. 13.12.074 - New or expanded loads. 13.12.075 - Schedule MW -03- Municipal water pumping time of use rate. • 13.12.080 - Contract sales and purchases. 13.12.100 - Electrical work permits and fees. 13.12.110 - Contract and administration charge. 13.12.015 — Time of use electric rate. After City Council formally accepts the Advanced Metering Infrastructure System, the monthly rate for electricity consumed shall be in accordance with Sections 13.12.031, 13.12.0401, 13.12.0411., 13.12.0421., 13.12.044, 13.12.061, and 13.12.075. The monthly rate includes all applicable taxes. 13.12.020 - Uniform electric rate. Before the City Council formally accepts the Advanced Metering Infrastructure System, Tthe monthly rate for electricity consumed shall be in accordance with sections 13.12.030 13.12.040, 13.12.041, 13.12.042, 13.12.043, 13.12.060, through 13.12.073, and the demand response credits in accordance with Sections 13.12.031.D, 13.12.0401.E, and 13.12.0421.D. The monthly rate includes all applicable taxes. 13.12.031 — Schedule R -03- Residential service time of use rate. A. Applicability. This schedule applies throughout the City for domestic uses in single family residences, individual apartments or farms. Separately metered services incidental to single family residential and farm service may be served under this schedule. B. Character of Service. Sixty cycle, alternating current, 120/240 volts nominal, single phase service will be furnished under this schedule, supplied through a single meter and one point of delivery. C. Time of Use Rate: 1. Base charge $15,75 per month. 2. Monthly energy charge between September 1 and May 31 $0.06700 per kWh during heavy load hours, $0.05800 per kWh during medium load hours, and $0.05000 per kWh during light load hours. 3. Monthly energy charge between June 1 and August 31 $0.06930 per kWh during heavy load hours, $0.0599 per kWh during medium load hours, and $0.04520 per kWh during light load hours. -2- • • 4. Heavy load hours are all hours from 6:00:00 a.m. to 1:59:59 p.m. Monday through Saturday. Medium load hours are all hours from 2:00:00 p.m. to 9:59:59 p.m. Monday through Saturday. Light load hours are all other hours Monday through Saturday, all day Sunday, and all day on North American Electric Reliability Corporation specified holidays. Pacific Prevailing Time applies (Pacific Standard Time or Pacific Daylight Time, as applicable). D. Demand Response Credits. Devices controlled by the City during demand events, providing the customer has not disabled the controls or opted out of participation, shall receive a credit as follows: 1. Water heater load control switch $10.00 credit per month. 2. Smart thermostat or home area network $10.00 credit per month. 3. Water heater load control switch and smart thermostat $10.00 credit per month. 4. Thermal storage system $10.00 credit per month. 13.12.0401. Schedule GS -03 - General service time of use rate. A. A s .licabilit . This schedule a lies to all accounts not covered b other rate schedules with the following types of service: 1. 120/208 or 120/240 volts sin le or three .hase service . anel of 400 am s or smaller. 2.240/480 or 277/480 volts three .hase service .anel of 200 am.s or smaller. 3. Munici al traffic si nal and street li ' hts. 4. Municipal emergency management systems. 5. Cable television s stem and other communications s stems sin le .hase sower su..lies in accordance with Section 10.2 of Ordinance no. 3116. B. Character of Service. Sixt c cle alternating current at such .hase and voltage as the City ma have available will be furnished under this schedule as .lied through a single meter and one point of delivery. C. Time of Use Rate: 1. Base Charge a. Single phase $21.50 per month b. Three phase $53.75 per month c. Municipal traffic signal $179.00 per month d. Municipal street light $128.90 per month e. Municipal emergency management system $27 20 per month 2. Monthly Energy Charge between se 1 and Mav 31 0.06800 kWh during heelv ly oad hours 0.05800 . er kWh durin medium load hours and '. 0.05000 . er kWh durin ' li ' ht load -3- • • hours. 3. Monthly Energy Charge between June 1 and August 31 $0 07040 per kWh during heavy load hours ', 0.0599 . er kWh durin medium load hours and ', 0.04520 . er kWh durin ' li ht load hours. 4. Heav load hours are all hours from 6:00.00 A.M. to 1:59:59 P.M. Monda throu ' h Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M., Monday through Saturday. Light load hours are all other hours Monday through Saturday, all day Sunday, and all day on North American Electric Reliability Corporation specified holida s. Pacific Prev. ilin ' Time a..lies Pacific Standard Time or Pacific Da li ht Time as applicable). 5. The base charges for municipal traffic signals and street lights includes maintenance of existing luminaries and controls by the Public Works and Utilities Department. 6. The municipal emer enc management s stem base charge shall a..1 to s stems with a normal operating load of 150 watts or less, which shall not be required to be metered. D. Munici p al Streets Li hts. The electric utilit rates for munici s al street li htin' shall recover the cost of providing service. In different areas of the City, the Department shall meter re.resentative 150 and 200 watt street lights. Each light so metered shall be char'ed a base charge. The monthly energy charge shall be determined by multiplyin • the number of street li ht fixtures times the monthl consum.tion determined b the metered li ' hts. E. Demand Response Credits. Devices controlled b the City durin demand events .rovidin' the customer has no disabled the controls or o.ted out of .artici.ation hall receive a credit as follows: 1. Water heater load control switch $10.00 credit per month. 2. Smart thermostat or home area network $10.00 credit per month. 3. Water heater load control switch and smart thermostat $10.00 credit per month. 4. Thermal storage system $10.00 credit per month. 13.12.0411. Schedule GD -03 - General service demand time of use rate. A. A..licabilit . This schedule ap.lies to all not covered b other rate schedules with the following types of service: 1. 120/208 or 120/240 volts. sinele or three phase. service panel lar ' er than 400 amps. 2.240/480 or 277/480 volts three .hase service . anel lar • er than 200 am. s. B. Character of Service. Sixty cycle, alternating current at such .hase and volta'e as the Cit ma have available will be furnished under this schedule as.lied throu h a sin e meter and one point of delivery. C. Time of Use Rate: -4- • • 1. Base Charge: a. Single phase $42.95 per month b. Three phase $107.40 per month 2. Monthly Enerev Charge between September 1 and May 31 $0.04660 per kWh during heavy load hours 0.04660 . er kWh durin medium load hours and ', 0.03750 . er kWh durin • li • ht load hours. 3. Monthly Energy Charge between June 1 and August 31 $0 04820�er kWh during heavy load hours 0.04820 . er kWh durin medium load hours and 0.03390 . er kWh durin • li • ht load hours. 4. Heav load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M. Monda throu • h Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M. Monday through Saturday. Light load hours are all other hours Monday through Saturday, all day Sunday, and all day on North American Electric Reliability Corporation specified holidays. Pacific Prevailin • Time a..lies Pacific Standard Time or Pacific Da li ht Time as applicable). 5. Billing Demand: a. Billin demand for each month shall be based on the maximum hour of KVA a..arent power) during Heavy Load Hours. b. Monthly Demand Charge between September 1 and May 31 $3.50 per KVA for 95% of all KVA and $9.80 per KVA for 5% of all KVA. c. Monthl Demand Char ' e between June 1 and Au ust 31 ', 3.50 . er KVA for 95% of all KVA and $9.06 per KVA for 5% of all KVA. 13.12.0421. Schedule NP -03 - Nonprofit tax - deductible — time of use rate. A. A..licabilit . This schedule a..lies to all non.rofit tax - deductible or • anizations. B. Character of Service. Sixt c cle alternating current at such .hase and voltage as the Cit ma have available will be furnished under this schedule ap flied throu • h a single meter and one point of delivery. C. Time of Use Rate: 1. Base Charge a. Single phase $21.50 per month b. Three phase $53.75 per month 2. Month' Ener Char e between Se tember 1 and May 31 $0.07110 per kWh durinpr heavy load hours, $0.05770 . er kWh durin • medium load hours. and $0.04970 . er kWh durin • li • ht load hours. 3. Monthl Energ Char e between June 1 and August 31 0.07360 kWh durinp heavy load hours $0.05960 Der kWh durin • medium load hours. and 0.04490 er kWh durin li ht load -5- • • hours. 4. Heavy load hours are all hours from 6:00:00 A.M. to 1:59 :59 P.M., Monday through Saturday. Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M., Monday through Saturday. Light load hours are all other hours Monday through Saturday, all day Sunday, and all day on North American Electric Reliability Corporation specified holidays. Pacific Prevailing Time applies (Pacific Standard Time or Pacific Daylight Time, as applicable). D. Demand Res.onse Credits. Devices controlled b the Cit durin demand events providing the customer has not disabled the controls or opted out of participation, shall receive a credit as follows: 1. Water heater load control switch $10.00 credit per month. 2. Smart thermostat or home area network $10.00 credit per month. 3. Water heater load control switch and smart thermostat $10.00 credit per month. 4. Thermal storage system $10.00 credit per month. 13.12.044 Schedule GD -04 - General service demand — primary metered — time of use rate A. Applicability. This schedule applies to all accounts not covered by other rate schedules with the following types of service: 1. 120/208 or 120/240 volts, single or three phase, service panel larger than 400 amps. 2.240/480 or 277/480 volts, three phase service panel larger than 200 amps. 3. When electric current is measured at primary voltage and delivery to the customer is at secondary voltage. B. Character of Service. Sixt c cle alternatin current a such .hale and volta• e as the Cit ma have available will be furnished under this schedule a..lied throu ' h a sin le meter and one point of delivery. C. Time of Use Rate: 1. Base Charge: a. Single phase $42.95 per month b. Three phase $107.40 per month 2. Monthly Energy Charge between September 1 and Ma 31 0.04590 Der kWh durinv heavy load hours ', 0.04590 . er kWh durin medium load hours and 0.03690 . er kWh durin • li ht load hours. 3. Monthly Energy Charge between June 1 and Au ust 31 0.04740 er kWh during heavy load hours ', 0.04740 . er kWh durin medium load hours and ', 0.03330 . er kWh durin li ' ht load hours. 4. Heav load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M. Monda throu • h Saturda . Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M. Monda throu h Saturda . Li ' ht load hours are all other hours Monda throu ! h Saturda all da -6- • • Sunday, and all day on North American Electric Reliability Corporation specified holidays. Pacific Prevailing Time applies (Pacific Standard Time or Pacific Daylight Time, as applicable). 5. Billing Demand: a. Billing demand for each month shall be based on the maximum hour of KVA (apparent power) during Heavy Load Hours. b. Monthly Demand Charge between September 1 and May 31 $3.45 per KVA for 95% of all KVA and $9.80 per KVA for 5% of all KVA. c. Monthly Demand Charge between June 1 and August 31 $3.45 per KVA for 95% of all KVA and $9.06 per KVA for 5% of all KVA. 13.12.061 Schedule PS -03 - Primary service — time of use rate. A. Ap.licability. This schedule applies to all accounts which own and operate a primary volta ' e distribution system with a connected load greater than 1,000 KVA. B. Character of Service. Service to be furnished under this schedule is unregulated three phase, sixty cycle, alternating current at primary voltage, 12.5 KV nominal. Service under this schedule shall be provided and metered at the point(s) of interconnection of the distribution facilities of the customer and the City. C. Time of Use Rate: 1. Base Charge: $286.35 per month 2. Monthly Energy Charge between September 1 and May 31 $0 04100 per kWh durin heavy load hours 0.04100 er kWh durin medium load hours and 0.03300 per kWh during light load hours. 3. Monthly Energy Charge between June 1 and August 31 $0 04240 per kWh during heavy load hours, $0.04240 per kWh during medium load hours, and $0.02980 er kWh during li ht load hours. 4. Heav load hours are all hours from 6:00:00 A.M. to 1:59:59 P.M. Monda throu ' h Saturday Medium load hours are all hours from 2:00:00 P.M. to 9:59 :59 P.M. Monday throu • h Saturday Light load hours are all other hours Monda throu • h Saturda all da Sunda and all da on North American Electric Reliabilit Co .oration specifed h.lida s. Pacific Prevailin Time a..lies applicable). 5. Billing Demand: a. Billin' demand for each month shall be based on the maximum hour of KVA apparent power) during Heavy Load Hours. b. Monthly Demand Charge between September 1 and Ma 31 $4.30 per KVA for 95% of all KVA and $9.80 per KVA for 5% of all KVA. Pacific Standard Time or Pacific Da i ht Ti e as -7- • • c. Monthly Demand Charge between June 1 and August 31 $4.30 per KVA for 95% of all KVA and $9.06 per KVA for 5% of all KVA. 13.12.075 Schedule MW -03 - Municipal water pumping — time of use rate. A. Applicability. This schedule applies to municipal water pumping facilities where the connected load is greater than 500 KVA. B. Restrictions. Timers approved by the Public Works and Utilities Department shall be installed to prevent pumping during restricted hours as determined by the Public Works and Utilities Department. C. Character of Service. Service to be furnished under this schedule is three phase, sixty cycle, alternating current at such phase and voltage as the City may have available will be furnished under this schedule, applied through a single meter and one point of delivery. D. Time of Use Rate: 1. Basic Charge: $286.35 per month 2. Monthly Energy Charge between September 1 and May 31 $0 06440 per kWh durin heavy load hours $0.06440 per kWh during medium load hours, and $0.03210 .er kWh durin light load hours. 3. Monthly Energy Charge between June 1 and August 31 $0 06650 per kWh durin heav Iy oad hours $0.06650 pet. kWh durin a medium load hours. and $0.02900 ner kWh durin light load hours. 4. Heav load hours are all hours from 6:00:00 A.M. o 1:59:59 P.M. Monda throu h Saturda Medium load hours are all hours from 2:00:00 P.M. to 9:59:59 P.M. Monda throu h Saturda Li ! ht load hours are all other hours Monda through Saturda all day Sunda_ and all da on North American Electric Reliabilit Co .oration s.ecified holida s. Pacific Prevailin • Time applies (Pacific Standard Time or Pacific Da li • ht Time as applicable). 5. Billing Demand: a. Billing demand for each month shall be based on the maximum hour of KVA a..arent power) during Heavy Load Hours. b. Monthl Demand C are e between September 1 and Ma 31 '.3..5 .er KVA for 9 % of all KVA and $9.80 per kW for 5% of all KVA. c. Monthl Demand Char ' e between June 1 and Au ust 31 ', 3.65 per KVA for 95% of all KVA and $9.06 per KVA for 5% of all KVA. -8- • • Section 2 - Corrections. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of the scrivener's /clerical errors, references, ordinance numbering, section /subsection numbers and any references thereto. Section 3 - Severability. If any provisions of this Ordinance, or its application to any person or circumstances, are held invalid, the remainder of the Ordinance, or application of the provisions of the Ordinance to other persons or circumstances, is not affected. Section 4 - Effective Date. This Ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum. This ordinance shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 17th day of April, 2012. ATTEST: sa Hurd, City Clerk PUBLISHED: April 22 2012 By Summary MAYOR, CHERIE , IDD APPRO1 ED AS TO FORry 7 illiam E. Bloor, City Attor G \LEGAL\a ORDINANCES &RESOLUTIONS \ORDINANCES 2012 \05 - Electric- TlmeofUse Chapter 3 12 02 22 I2docx docx -9- • Summaries of Ordinances Adopted by the Port Angeles City Council On April 17, 2012 Ordinance No. 3451 This Ordinance of the City of Port Angeles, Washington, revises Chapter 3.70 of the Port Angeles Municipal Code relating to Medic I Charges. Ordinance No. 3452 This Ordinance of the City of Port Angeles, Washington, relating to electricity services and charges makes changes to Chapter 13.12 of Title 13 of the Port Angeles Municipal Code. The full texts of the Ordinances are available at City Hall in the City Clerk's office, on the City's website at www.cityofpa.us, or will be mailed upon request. Office hours are Monday through Thursday, 8:30 a.m. to 4:00 p.m., and Friday 8:30 a.m. to 12:30 p.m. These Ordinances shall take effect five days following the date of publication by summary. Publish: April 22, 2012 • Janessa Hurd City Clerk