Loading...
HomeMy WebLinkAboutMinutes 06/11/2008 ~ORTANGELES WAS H I N G TON, U. S. A. COMMUNITY & ECONOMIC DEVELOPMENT AGENDA PLANNING COMMISSION 321 East Fifth Street June 11,2008 6 p.m. I. CALL TO ORDER Pledge Of Allegiance Led by the Chair II. III. IV. . V. VI. ROLL CALL APPROVAL OF MINUTES: Regular meetings of May 28 and April 23, 2008 WORK SESSION: NPDES Site Coverage Discussion/Work session COMMUNICATIONS FROM THE PUBLIC STAFF REPORTS Urban Growth Area Zoning VII. REPORTS OF COMMISSION MEMBERS VIII. ADJOURNMENT . PLANNING COMMISSIONERS John Matthews (ChaJr), Doc ReISS (VIce), Dave Johnson, Werner BeIer, MIke CaudIll, John SmIth, TIm Boyle PLANNING STAFF. Nathan West, Deputy DIrector, Sue Roberds, Plannmg Manager, Scott Johns, ASSOCIate Planner, Dan BIalzlk, ASSIstant Plannel . . . MINUTES PLANNING COMMISSION Port Angeles, Washington 98362 June 11, 2008 6:00 p.m. ROLL CALL Members Present: John Matthews, Werner Beier, Mike Caudill, John Smith, Doc Reiss, Tim Boyle Members Excused: Dave Johnson Staff Present: Sue Roberds, Scott Johns, Nathan West Public Present: None APPROVAL OF MINUTES Commissioner Caudill moved to accept the April 23, 2008, regular meeting minutes as presented. The motion was seconded by Commissioner Boyle, and passed 4 - 2 with Commissioners Reiss and Beier abstaining due to their absence from that meeting. Commissioner Reiss moved to accept the May 28, 2008, minutes as presented. The motion was seconded by Commissioner Beier, and passed 4 - 2 with Commissioners Smith and Caudill abstaining due to their absence at that meeting. WORK SESSION SITE COVERAGE ANALYSIS Associate Planner Scott Johns provided a power point presentation identifying how site coverage is determined and what it entails. Site coverage is the percentage of surface area that is covered. Impervious versus pervious materials were defined and calculations of such was discussed. Mr. Johns responded to Commissioner Matthews that there is currently no site coverage maximum within the City limits. Each zone allows a percentage of lot coverage, i.e., how much of a site can be covered by structures. Mr. Johns further explained that the federal National Pollutant Discharge Elimination System (NPDES) permit mandates the City to specifically manage stormwater. Site coverage is one method to manage site runoff concerns. Site coverage guidelines can be used to document how the City is handling its stormwater under the mandated regulations. The City is interested in evaluating the average coverages that exist in various zones of the City and determine what is palatable to the public that is supportable by the regulations the City is bound to operate under. The Commissioners discussed pervious versus impervious costs and engineered stormwater plan requirements and practices. This being a work session to introduce the matter, staff ended by stating that there would be a further work session and public hearing within the next few months to air the matter to the public. . . . Planmng CommiSSIOn Minutes June II, 2008 Page 2 URBAN GROWTH AREA ZONING Deputy Director Nathan West presented a power point presentation on proposed Urban Growth Area (UGA) zoning designations and provided a comparison between various County zoning allowances and those City designations that are most similar. It is proposed that the County will amend the designations in those areas where annexation is expected through the State Growth Management Act, to align with the City's most like zoning designation to provide an opportunity for seamless annexation at a future date. COMMUNICATIONS FROM THE PUBLIC None STAFF REPORTS Scott Johns said that Commissioner Johnson would be absent for the summer meetings due to health reasons. REPORTS OF COMMISSION MEMBERS None ADJOURNMENT The meeting adjourned at 7:10 p.m. PREPARED BY: S. Roberds