HomeMy WebLinkAboutAgenda Packet 04/09/2007
Utility Advisory Committee
Public Works Conference Room
Port Angeles, W A 98362
April 9, 2007
3:00 P.M.
AGENDA
I. Call To Order
II. Roll Call
III. Approval Of Minutes For March 13,2007
Approval Of Minutes For March 16,2007
N. Late Items
V. Discussion Items
A. Solid Waste Comp Plan Review
B. EWTP Easement
C. 2006 Water Quality Report
D. Brown & Caldwell Consultant Agreement Amendment
E. Detailed Design Of Phase I CSO Projects
F. Public Works Trust Fund Loan Application For CSO Projects Phase I
G. Parametrix 2007 Consultant Agreement Amendment
H. Stormwater Rate Discussion Continued (If Time Permits)
VI. Executive Session
VII. Next Meeting Date: May 8,2007
VIII. Adjournment
N :\UAC\Final\040907 .wpd
UTILITY ADVISORY COMMITTEE
GUEST SIGN UP SHEET
PRINT NAME ORGANIZATION ..
JQ.f\f\'i Boi. \e.,'1 :P~C4l'l e-+r,' v.
f~uL I I
l,;.q /v{cu ~ Cv" 0-' ..
~$ .
In jPr ;i!:-:r / fiJ C ~~Gt:... LJ.~ Ca.
Ut ;/(<- J;>Sh_LIr ~ II i-
f
I
.
.
.
.
.
N: \PWKS \LIGHT\ CONS \ CATE \ SIGNUP.wpd
Utility Advisory Committee
Public Works Conference Room
Port Angeles, W A 98362
March 13, 2007
3:00 P.M.
AGENDA
I)
~4ifp
~
~
L Call To Order
Chairman Reed called the meeting to order at 3:00 p.m.
IL Roll Call
Members Present:
Chairman Reed, Orville Campbell, Grant Munro (3:03), Betsy
Wharton, Richard Headrick (3:03)
Members Absent:
Karen Rogers
Staff Present:
Bill Bloor, Glenn Cutler, Mike Puntenney, Scott McLain, Gary
Kenworthy, Larry Dunbar,Tom McCabe, Cate Rinehart
Others Present:
Brian Gawley - Daily News
Paul Lamoureux - Citizen
IlL Approval Of Minutes:
Chairman Reed asked ifthere were any corrections to the minutes of February 13, 2007. The
word "unanimously" was deleted at the bottom of page three. Orville Campbell moved to
approve the minutes. Councilmember Wharton seconded the motion, which carried
unanimously.
IV.
Late Items:
None
V. Discussion Items:
A. Ordinance To Establish Prices For Compost Sales
Tom McCabe, Solid Waste Superintendent, advised that compost from the Co-Composting
Facility would be available beginning in April. Staff researched market pricing for compost and
recommended that an appropriate price would be $20.00 per cubic yard for purchases of up to
three cubic yards, and $17.00 per cubic yard for purchases of more than three cubic yards. There
was a brief discussion.
UTILITY ADVISORY COMMITTEE
March 13,2007
Councilmember Wharton moved to recommend City Council adopt the proposed
amendment to the transfer station rate ordinance. Orville Campbell seconded the motion,
which carried unanimously.
B. Benefit Dump Day
Tom McCabe, Solid Waste Superintendent, pointed out that the City sponsors an annual Benefit
Dump Day for all Clallam County residents. This is the first year that this event will be
conducted using the new transfer station and Waste Connections is donating their staff to assist.
There was a brief discussion.
Councilman Munro moved to recommend City Council support the annual Benefit Dump
Day 'scheduled for Sunday, April 15, 9:00 a.m. to 3:00 p.m. at the Port Angeles Regional
Transfer Station with a minimum $5.00 fee for every participant of the event.
Councilmember Wharton seconded the motion, which carried unanimously.
C. Water Use Efficiency Program
Larry Dunbar, Power Resources Manager, noted that the Department of Health had adopted a
Water Use Efficiency Rule that mandates the City to develop a water use efficiency program by
January 22,2008. Mr. Dunbar reviewed the various activities required. A discussion followed.
No action taken. Information only.
D. Water Rate Design Goals
Larry Dunbar, Power Resources Manager, distributed a handout and gave a presentation based on
that information. Points of interest were rate design goals, objectives, and considerations, rate
design alternatives, and rate discount alternatives. There was a lengthy discussion. Staffwas
directed to continue with the current approach and to publicize the reasons for rate increases in
the future.
No action taken. Information only.
E. CH2M Hill Consultant Agreement, Project 07-08
Gary Kenworthy, City Engineer, advised that the newly signed Agreed Order with the
Department of Health requires the design, approval, and construction of a temporary corrosion
control facility. Additionally, engineering support is needed regarding the impacts of the federal
Elwha Dam Removal Project. The new agreement tasks are the Corrosion Control Facility,
Elwha Dam Mitigation, and directed services. There was a brief discussion.
Councilmember Wharton moved to recommend City Council approve a new Agreement
UTILITY ADVISORY COMMITTEE
March 13, 2007
with CH2M Hill, for an amount not to exceed $113,000. Councilman Headrick seconded
the motion, which carried unanimously.
F. Storm water Utility Rates
Continued to Friday, March 16,2007 at 1:00 p.m.
VI. Executive Session
Adjourn to executive session - 4:44 p.m.
Executive session under RCW 42.30.110(1)( c) to discuss with legal counsel potential litigation
and (i) to consider the terms on which real estate will be offered for sale.
Executive session concluded at 5:00 p.m. Meeting resumed in regular session.
VIL Next Meeting Date: March 13, 2007
VIIL Adjournment: The meeting was adjourned at 5:00 p.m.
Chairman Reed
Cate Rinehart, Admin Spec II
N:\PWKS\LIGHTiCONS\CA TE\march 13meet.wpd
Utility Advisory Committee
(Continued From March 13,2007)
Port Angeles, W A 98362
March 16, 2007
/)
~4~
,.
AGENDA
L Call To Order
Chairman Reed called the meeting to order at 1 :06 p.m.
IL Roll Call
Members Present:
Chairman Reed, Karen Rogers, Orville Campbell, Betsy Wharton
Members Absent:
Grant Munro
Staff Present:
Bill Bloor (1 :09), Glenn Cutler, Mike Puntenney, Scott McLain,
Gary Kenworthy, Steve Sperr, Cate Rinehart
Others Present:
None
IlL Executive Session
Adjom to executive session - 1 :07 p.m.
Executive session under RCW 42.30.110(1)( c) to discuss with legal counsel potential litigation
and (i) to consider the terms on which real estate will be offered for sale.
Executive session concluded at 1: 15 p.m. Meeting resumed in regular session.
IV. Roll Call
Chairman Reed request a second roll.
Members Present:
Chairman Reed, Karen Rogers, Orville Campbell, Betsy Wharton,
Grant Munro (1 : 18)
Members Absent:
None
Staff Present:
Bill Bloor, Glenn Cutler, Nathan West (1: 17), Mike Puntenney,
Scott McLain, Gary Kenworthy, Steve Sperr, Cate Rinehart
v.
Discussion Item:
Stormwater Utility Rates
UTILITY ADVISORY COMMITTEE
March 16, 207
Gary Kenworthy, City Engineer, reviewed the information in the packet, responded to questions,
and provided clarification. Rate proposals were discussed along with projects and their
priorities. Staff was directed to determine the fall deadline to obtain funding in 2008, to ascertain
a possible sliding scale on commercial property, revisit a short term utility rate, look into the
possibility of delaying a decision until the new engineer arrives, and bring a revenue calculator to
a future meeting.
No action taken. Information only.
VI.
Next Meeting Date:
April 10, 2007
VIL Adjournment:
Vice Chairman Rogers moved to adjom at 1: 51 p.m. in the absence of Chairman Reed who left
at 1 :40 p.m.
Chairman Reed
Cate Rinehart, Admin Spec II
N:\PWKS\LIGHTlCONS\CA TE\rnarch 16rneet.wpd
~ORTAN ELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
Date:
April 9, 2007
To:
Utility Advisory Committee
From:
Tom McCabe, Solid Waste Superintendent
Subject:
Comprehensive Solid Waste Management Plan (CSWMP) Update
Summary: The CSWMP addresses solid waste management throughout Clallam County. Since
June 2005, the Solid Waste Advisory Committee (SW AC) has been developing an update to this
plan. The plan has been updated and is awaiting adoption by the various jurisdictions covered by
the plan.
Recommendation: Forward a favorable recommendation to City Council to adopt the
CSWMP.
Background/Analysis: The Comprehensive Solid Waste Management Plan (CSWMP) addresses
solid waste management throughout the county. The existing plan was adopted in 2000. The
Washington State Department of Ecology (DOE) requires the plan to be reviewed and updated
every five years per RCW 70.95.110(2). The solid waste system in Clallam County is in the midst
of several changes including closure of the Port Angeles Landfill and subsequent transition form
waste disposal in a local landfill to waste export. The City of Port Angeles and Clallam County
met with DOE and asked to delay the plan update for a year due to the changes. The Department
of Ecology extended the deadline for the plan to be completed in early 2007.
The Solid Waste Advisory Committee began work on the update in June of2005. The SW AC
membership is comprised of the cities of Forks, Port Angeles, and Sequim, along with Clallam
County, the Makah Tribe, the Quileute Tribe, the Lower Elwha Klallam tribe, the Jamestown
S 'Klallam Tribe, a Citizen at Large, the Waste Haulers, and an Industrial/Businesses
representative. The goals and objectives of the plan and final milestones are listed on page two of
this memo.
The plan has been updated and was reviewed by DOE and the Washington State Utilities
Transportation Commission. On April 9, 2007, Jenny Bailey from Parametrix will be giving a
power point presentation to the Clallam County Commissioners, the City of Port Angeles Utility
Advisory Committee, and the City of Sequim City Council. A presentation will also be given at
the April 17, 2007 Port Angeles City Council meeting, along with a resolution for adoption of the
plan.
N :\UAC\Final\compplanupdateUAC I.doc
The Goals and Objectives ofthe CSWMP Update are as follows:
. Review the recommendations ofthe previous plan.
. Describe the newly established solid waste system, including the transition from a landfill
to a transfer station and waste export.
. Review current solid waste regulations and policies giving particular attention to waste
stream reduction, recycling, and future disposal needs.
. Extend the planning period to 2025 and develop current waste generation data.
. Review existing facilities and solid waste handling practices, and identify additional needs.
. Assess alternatives and develop recommendations for future action, incorporating the
results of recent studies done for Clallam County, the City of Port Angeles, and others.
. Give particular consideration to alternatives that involve the expertise of private industry
wherever those capabilities are available.
. Develop capital cost estimates and implementation schedules for required improvements
with an emphasis on those improvements required within a 6-year period.
. Provide guidelines for an equitable balance between convenience, expense, environmental
quality, and public health and welfare.
. Incorporate flexibility to anticipate future needs.
. Encourage cooperative and coordinated efforts among government agencies, private
. companies, and the public, to achieve management of solid waste.
. Provide a road map to guide the County through anticipated changes in solid waste disposal
caused by the future closure ofthe Port Angeles Landfill.
Remaining steps to formalize the CSWMP Update are as follows:
. Adoption of the Final Draft by the Cities, Tribes, and Clallam County.
· Submittal of the Final CSWMP with resolutions of adoptions to DOE for final review.
. Final Approval by DOE.
~ORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
Date:
April 9, 2007
To:
Utility Advisory Committee
From:
Stephen Sperr, P.E., Engineering Manager
Subject:
EWTP Easement for the Elwha Dam Removal Project
Summary: The City, as part ofthe Memorandum ofDnderstanding (MOD) with the National
Park Service (NPS), executed on August 6, 2004, agreed to grant an easement over portions of its
properties adjacent to the Elwha River. This easement will allow the National Park Service to
construct the Elwha Water Treatment Plant (EWTP) facilities, and operate and maintain the EWTP
during the dam removal impact period.
Recommendation: Forward a favorable recommendation to City Council to authorize the
City Manager to sign an easement and related documents for the construction, operation,
maintenance, implementation, repair, and inspection of the Elwha Water Treatment Plant
by NPS.
Background/Analysis: The Elwha River Ecosystem and Fisheries Restoration Act (EREFRA),
Public Law 102-495, provides authority for an easement and for construction of mitigation
facilities. The Department of Interior, National Park Service, intends to design, construct, operate,
maintain, implement, repair, and inspect the EWTP and related facilities, as agreed to in the MOD,
executed August 6, 2004.
The City is the fee owner of properties on which the proposed EWTP project, flood control levee,
and additions to the existing Ranney Well facilities will be constructed (see attached map showing
the easement boundaries). The City intends to grant an easement over and across portions of said
properties for the purposes of implementing the EWTP project, constructing a flood control levee
for the EWTP project, and adding to and modifying the existing Ranney Well facilities.
The proposed easement will allow the NPS to construct the EWTP, improvements to the Ranney
Well facilities, and other related facilities. It will also allow the NPS to operate and maintain the
EWTP, Ranney Well facilities and other related facilities during the dam removal impact period.
The easement will extend until December 31, 2046, or upon full execution of a separate Transfer
Agreement, providing for the transfer of sole ownership and control of the EWTP and related
N:\UAC\DepDir\EWTP Easement.doc
EWTP Easement for the Elwha Dam Removal Project
April 9, 2007
Page 2
facilities to the City, whichever comes first. At the end ofthe term ofthe easement, the National
Park Service will no longer have an easement right.
This is the third easement for the Elwha Project to be addressed by the City Council- the first one
was for the Port Angeles Water Treatment Plant, which was authorized by Resolution at its
November 7, 2006 meeting. A second easement, for the Elwha Surface Water Intake, a new
surface water intake on the Elwha River, was authorized by Resolution at its February 6,2007
meeting.
It is recommended that the Utility Advisory Committee forward a favorable recommendation to
the City Council to authorize the City Manager to sign on behalf ofthe City an easement for the
construction, operation, maintenance, implementation, repair, and inspection of the Elwha Water
Treatment Plant and improvements to the Ranney Well facilities.
Attachment: Map of Easement Boundaries
1111's map is /101 illlellded /0 be IlSed Q.I" a "-gal description
This mapldralf'ing is prodllced by the CIty nfPOrl Atl8d....,f~ its own IlSe alld p/ll'pn:Jes_
Any aiher use a/this rnapldral."ingshaJ/ nol be the responsibilityaftM Cifl'.
Verlical Datllm = NAffi 88
/lorizaOlal Datum = ""AD8319/
N
A
400
Feet
Legend
Parcel
Easement
- Lines
DATE:
To:
FROM:
SUBJECT:
~RTANGBLHS
WASHINGTON, U.S.A.
UTILITY ADVISORY COMMITTEE MEMO
April 9, 2007
UTILITY ADVISORY COMMITTEE
Ernie Klimek, W ater/W astewater Collection Superintendent
Consumer Confidence/Water Quality Report for calendar year 2006
Summary: The Washington State Department of Health requires that every water system
provide an annual Consumer Confidence Report to its customers. The report is to contain
information on the potential contaminants present in the water supply that customers receive.
The attached report for the Port Angeles Water Supply has been prepared for distribution to the
City's water customers.
Recommendation: For Information Only.
Background/Analysis: In 1996 Congress passed amendments to the Safe Drinking Water Act
that included a mandate from the Environmental Protection Agency (EP A), to require
community water systems to provide each of their customers with a "Consumer Confidence
Report (CCR)" every twelve months. This year's report, using 2006 data, will be delivered to all
City of Port Angeles water customers with the May/June utility billing statements, along with a
public information announcement in the local paper, and posted on the City's web site. This
year's report must be distributed by July 1,2007.
The attached Water Quality Report for calendar year 2006 has been developed in accordance
with the EP AlCCR regulations by City staff. The regulations require information on the quality
of the water delivered by the system, and characterization of any risks from exposure to
contaminants in the drinking water in an accurate and understandable manner. The City has
already provided the content of the Water Quality Report to our wholesale customers and
Clallam County Public Utility District #1 as it is required to do by April 1 st, 2007.
Attachment: Water Quality Report - 2006
N:\UAC\Final\UAC Memo WQ Report-2006.doc
a"C:er
us"C:ol11er
J~ne 1007
The City of Port Angeles is pleased bring you water that satisfies all
to provide you with our annual of the requirements of the Safe
Consumer Confidence/Water Drinking Water Act. This report
Quality Report. The includes details
purpose of this report about where
is to tell our customers your water
about the high quality comes from, its
of their water and to quality and how
convey a basic knowl- it compares to
edge of our water sys- stringent stan-
tem. We aggressively dards set by
safeguard our Ranney reg u I at 0 r y
Well facility, located agencies. We
adjacent to the Elwha believe that
River, which enables customers who
us to always provide a are well in-
reliable and safe water formed are
supply. This report is a J able to make
summary of the quality We ve bad anotber better deci-
of water provided in great year, successfully sions about
200? It is a record re- nrovidinn 'UOu witb their drinking
fleeting the hard work r' :1 J' water supply.
by our employees to safe, clean water!!!
Last year, we conducted over 371 tests for con-
taminants. Three hundred twenty-four of these
were routine Coliform sampling, one sample for
Nitrate-N, four (one-per quarter) samples each for
total trihalomethane (TTHM), and haloacetic acid
(HAA5), twelve monthly samples for total organic
carbon (TOC's), one sample for volatile organic
contaminants (VOC's), one sample for arsenic,
and twenty-four samples for a combination of
new main construction and investigation. The
Agreed Order, with the Washington State Depart-
ment of Health, (DOH), Docket #2005-SAG-0002,
addresses the need for a corrosion control treat-
ment process. Pursuant to 2007-SAG-0001, cor-
rosion control will be installed by June 2008.
Do I need to take special precautions?
Some people may be more vulnerable to contami-
nants in drinking water than the general popula-
tion. Immuno-compromised persons such as per-
sons with cancer undergoing chemotherapy, per-
sons who have undergone organ transplants,
people with HIVjAIDS or other immune system dis-
orders, some elderly, and infants can be particu-
larly at risk from infections. These people should
seek advice about drinking water from their health
care providers. EPAjCenters for Disease Control
(CDC) guidelines on appropriate means to lessen
the risk of infection by cryptosporidium and other
microbial contaminants are available from the
Safe Drinking Water Hotline (800-426-4791).
Wate:r Santpling Conducted in 2006
Contaminant Sample Date Unit MCL MCLG Detected VioJa- Maior Sources
Level tion
Nitrates (EP A Regulated) at 7/18/06 ppm -mglL 10 (State Re- ND NO Erosion of natural deposits;
source--Elwha porting (None Detected) Runoff from fertilizer use.
Level =
0.100 mglL)
Microbiological Contaminants Monthly and as ppm -mglL Contami- No Contami- ND NO Naturally present in the
Monthly Samples (27) Plus 24 New Needed nant Pre- nan t Presen t environment
Cons't & Investigative sent
Total Organic Carbons (TOC's) I Sample per ppm -mglL NE NE ND NO Monthly sampling required
Month for reduced monitoring of
D/DBP
Trihalomethane (TTHM) I Sample per Quar- uglL 100 100 A vg. Detected NO Byproduct of Chlorine
ter 2.4 75 Disinfections Process
Halo-Acetic Acid (HAAS) I Sample per Quar- uglL 60 NE A vg. Detected NO Byproduct of Chlorine
ter .575 Disinfections Process
Volatile Organic Contaminants 8/1/06 ppm -mglL Variable Variable ND NO Testing ofthese chemicals
(VOC's) (62 Total) is regulated by State and
EPA
Arsenic 3/9/06 ppm -mglL 0.010 Q ND NO Testing ofthese chemicals
is regulated by State and
EPA
Inorganic Chemicals (23 Total) 7/25/06 ppm -mglL Variable Variable ND NO Testing of these chemicals
is regulated by State and
EPA
Term
porn - rng/L
ygLL..
NE
ND
MCLG
Definition
Parts per million, or milligrams per liter (mg/L)
Micrograms per liter
Not Evaluated
Not Detected
Maximum Contaminant Level Goal
Term
TTHM
HAAS
D/DBP
Definition
Total Trihalomethane
Haloacetic Acid
DisinfectantlDisinfection By-Products
MCL
Maximum Contaminant Level
Source water assessment and its
availability
Water from the Ranney Collector is
tested following the guidelines estab-
lished by the DOH to detect. potential
contaminants that could reasonably
be expected to be found in drinking
water. Because most of the land
through which the Elwha River flows
is inside the Olympic National Park.
there is limited opportunity for human
contamination of the water. Con-
taminants that might be expected in
untreated water include: biological
contaminants such as viruses and
bacteria; inorganic contaminants
such as salts and metals; pesticides
and herbicides; organic chemicals
from industrial or petroleum use; and
radioactive materials.
Why are there contaminants in mv
drinkinf! water?
Drinking water, including bottled wa-
ter, may reasonably be expected to
contain at least small amounts of
some contaminants. The presence of
contaminants does not necessarily
indicate that water poses a health
risk. More information about con-
taminants and potential health ef-
fects can be obtained by calling the
EPA's Safe Drinking Water Hotline
(800-426-4791). This information
can also be accessed at the EPA's
we bs ite ,kVw.w.,&..Qg.,gQ.vL$g fe.\1t.i;J.tf2.rL.
ccrl.html. The source of drinking wa-
ter (both tap and bottled water) in-
clude rivers, lakes, streams, ponds.
reservoirs, springs, and wells. As wa-
ter travels over the surface of the
land or through the ground, it dis-
solves naturally occurring minerals
and, in some cases, radioactive mate-
rial, and can pick up substances re-
sulting from the presence of animals
or from human activity.
Microbial contaminants such as vi-
ruses and bacteria, that may come
from sewage treatment plants, septic
systems. agricultural livestock opera-
tions, and wildlife. Inorganic contami-
nants, such as salts and metals,
which can be naturally occurring or
result from urban stormwater runoff,
industrial, or domestic wastewater dis-
charges, oil and gas production, min-
ing or farming. Pesticides and herbi-
cides. may come from a variety of
sources such as agriculture. urban
stormwater runoff, and residential
uses. Organic chemical contaminants,
including synthetic and volatile organic
chemicals. are by-products of indus-
trial processes and petroleum produc-
tion, and can also come from gas sta-
tions, urban stormwater runoff, and
septic systems. Radioactive contami-
nants can be naturally occurring or be
the result of oil and gas production
and mining activities. In order to en-
sure that tap water is safe to drink,
EPA prescribes regulations that limit
the amount of certain contaminants in
water provided by public water sys-
tems. Food and Drug Administration
(FDA) regulations establish limits for
contaminants in bottled water which
must provide the same protection for
public health.
Variance and Exemotions
In 2003 the City requested and was ap-
proved to reduce monitoring of Disinfec-
tions/Disinfectants By Products by the
DOH, having met the sampling require-
ments agreed to, being below the MCL, of
TTHM's, HAA(5)'s, and TOC's.
Violations and Exceedences
Copper-action level at consumer taps.
Copper is an essential nutrient, but some
people who drink water containing copper
in excess of the action level over a rela-
tively short amount of time could experi-
ence gastrointestinal distress. Some peo-
ple who drink water containing copper in
excess of the action level over many years
could suffer liver or kidney damage. Peo-
ple with Wilson's Disease should consult
their personal doctor. The City Water Util-
ity sampled sixty homes that were identi-
fied between the years 1982-1988
where contractors installed copper water
service lines with lead solder joints within
the home. The "Action Level" (1.3 ppm-
mgjL) for copper was exceeded by 0.55
ppm-mgjL. Construction of a corrosion
control system that will adjust the pH of
the treated water will be constructed by
June 2008, pursuant to the Agreed Order,
Docket #2007-SAG-0001.
'8
~
:P
:;,
()t),
$:
(tf,
(If
~
,Ql.
~'
$
'(j,:.
th
r+
$
3
en
c:
"0
((>
....
~
((>
::;
0.
((>
::;
r+
~ L
Date:
To:
From:
Subject:
FORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
April 9,2007
Utility Advisory Committee
Gary W. Kenworthy P.E., Deputy Director of Public Works/City Engineer
2007 Consultant Agreement with Parametrix, Inc. for Engineering Services
Summary: Parametrix, Inc. has been selected to continue to provide engineering services related
to the Solid Waste Utility and Landfill, including directed services. The Agreement will ensure
that ongoing engineering services needed to support solid waste activities and landfill closure
provided by Parametrix will continue. The Agreement has a negotiated overall not-to-exceed fee in
the amount of$694,491. The major tasks for 2007 beyond permitting and compliance activities
include operations support, final closure design and construction support, and shoreline
stabilization construction support.
Recommendation: Forward a favorable recommendation to Council to approve and
authorize the Mayor to sign an agreement with Parametrix for 2007 Engineering Services for an
amount not to exceed $694,491, which includes $50,000 for directed services that can only be
used with staff's rior a roval.
Back2:round/Analvsis: The current agreement for Professional Services with Parametrix Inc.
expired on January 31, 2007. Parametrix has provided engineering design, construction, and
environmental monitoring support services for the Solid Waste and Wastewater Utilities. When
problems have occurred Parametrix has been professional in accepting responsibility in their
resolution, including the absorbing and sharing of costs. Continuing with Parametrix is in the best
interest of the City due to their in-depth knowledge of City Solid Waste facilities and monitoring
programs.
The City has been working with Parametrix in developing a scope and budget for the continuation
of services similar to those in the existing Agreement. The negotiations have been extended to
include resolution of current construction issues. Only one item remains unresolved and it has been
removed from the agreement at this time.
Table 1 outlines the key tasks in the proposed new Agreement, with task amounts and what was
budgeted in 2007 for each task. Funding sources are from the approved solid waste and wastewater
budgets.
2007 Parametrix Agreement
April 9, 2007
Page 2
Table 1 - Summary of2007 Scope and Budget
PMX Task 2007 City Budget
TASK Fee Budget Reallocation
1. Engineering Assistance $48,916 $2,500 $50,000
2. Permitting and Compliance $87,669 $90,000 $90,000
3. Not Used $0 $0 $0
4. Design $69,051 $0 $70,000
5. Not Used $0 $0 $0
6. Construction Support* $438,855 $1,050,000 $440,000
7. Directed Services** $50,000 $50,000 $50,000
Total $694,491 $1,192,500 $700,000
* 2007 Budget shown is for total landfill closure. After the proposed reallocation, $492,500 will
.remain for the final closure project to be awarded later this year.
** Requires written authorization prior to proceeding.
. Task 1 provides engineering services to support routine solid waste handling activities and
landfill post-closure operations. Components include: (1) Gas System Maintenance and
Monitoring, (2) General Operations Assistance, (3) Project Management and
Coordination, Solid Waste Planning.
. Task 2 provides for regulatory reporting and permit coordination for landfill post -closure
operations. Components include:(l) Groundwater Monitoring, (2) Post-Closure Plan
Update, (3) Shoreline Improvement Permit support, (4) Landfill Closure Permit support.
. Task 3. Not used.
. Task 4 provides for Design Services. Components include: (1) Landfill Closure Design,
(2) Shoreline Monitoring and Adaptive Management Design, Final Specifications, CQA
Plan, Drawings, and Cost Estimate (PS & E), (3) Quality Assurance (QA), Project
Management, Meetings, and Macro Algae Survey.
. Task 5. Not used.
. Task 6 provides for construction support services for closure and shoreline improvements.
Components include: (1) Project Coordination, (2) Construction Administration and
Documentation, (3) Construction Observation and Construction Quality Assurance (CQA),
(4) Preparation of Record Drawings, and CQA Report.
N:\UAC\Final\Paramentrix 2007 Services Agreementdoc
2007 Parametrix Agreement
April 9, 2007
Page 3
. Task 7 provides for directed services to address unforeseen engineering or other services
that may be required during the contract duration. The scope and fee for these services are
negotiated and written authorization will be required to proceed with the work.
An additional summary of the 2007 Services, table 2, has been prepared to show the allocations of
the agreement task costs between Operations and the Landfill Projects:
Table 2- Operations & Landfill Projects Cost allocations.
TASK OPERATIONS CLOSURE BLUFF TOTALS
REVETMENT
l. Engineering Assistance $22,481 $17,409 $9,027 $48,916
2. Permitting and $87,669
Compliance $87,669 $0 $0
3. Vacant $0 $0 $0 $0
4. Design $0 $69,051 $0 $69,051
.
5. Vacant $0 $0 $0 $0
6. Construction S,upport* $0 $269,136 $169,719 $438,855
7. Directed Services** $5,000 $25,000 $20,000 $50,000
Total $115,150 $380,596 $198,746 $694,491
In 2008 the needs for engineering assistance at the landfill site should drop to the $100,000 range
to cover operations assistance and the ongoing monitoring required following closure.
The duration of the new agreement will be through January 31, 2008. Staff recommends that the
UAC support the agreement and forward it to Council with a recommendation that Council approve
and authorize the Mayor to sign an agreement with Parametrix for 2007 Engineering Services for an
amount not to exceed $694,491, which includes $50,000 for directed services that can only be used
with prior approval.
N:\UAC\Final\Paramentrix 2007 Services Agreement.doc
Date:
To:
From:
Subject:
~ORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
April 9, 2007
Utility Advisory Committee
Stephen Sperr, P .E., Engineering Manager
Amendment No.1, Brown and Caldwell Consultant Agreement 06-05
Summary: In February 2006, the City selected Brown and Caldwell to continue to provide
engineering services related to the City's wastewater and stormwater systems. An amendment to
the Agreement is needed to (1) finalize technical memos on odor control and a re-rating report for
the Wastewater Treatment Plant (WWTP), (2) complete septage receiving station design work, (3)
review specialized equipment that the City will be installing at the WWTP this year, and (4)
provide construction support services for the East Urban Growth Area sewer extension contract.
Recommendation: Forward a favorable recommendation to City Council to authorize the
Mayor to sign Amendment No.1 to Agreement 06-05 with Brown and Caldwell, increasing
the maximum compensation amount under the agreement by $187,000, from $850,000 to
$1,037,000.
Background/Analysis: In February 2006, the City signed an Agreement for Professional Services
with Brown and Caldwell (B&C) to provide engineering support services to assist the City in
completing four tasks and additional services as directed. A brief explanation and status of each
task follows:
· Task 1 - CSO Comprehensive Reduction Plan Update. B&C assisted the City in
negotiating with Department of Ecology (DOE) for approval of an update to its Combined
Sewer Overflow (CSO) Comprehensive Reduction Plan, which occurred in July 2006. This
task has been completed.
· Task 2 - Update to General Sewer Plan. The CSO Plan was converted to an updated
General Sewer Plan, including additional sewer system modeling, expansion of the sewer
service area, and a re-rating evaluation ofthe WWTP. The updated General Sewer Plan
was approved by Ecology in September 2006. This task has also been completed; except
that a final re-rating report will be completed under Amendment No.1 under Task 4.4
below.
N:\UAC\Final\Amend I to B&C Agreement 06-05.doc
Amendment No.1 to Agreement 06-05 with B&C
Apri19,2007
Page 2
. Task 3 - East UGA Sewer Extension. This task involved the design of a sewer interceptor,
with gravity sewer main, force main, and two pump stations, to serve a significant portion
of the East Urban Growth Area (EUGA). This task was completely funded by Clallarn
County's Opportunity Fund. Amendment No.1 will add funds to cover expenses associated
with additional design work for WSDOT franchise approval and final design changes.
. Task 4 - Industrial SWPPP and Wash-Down Facility. This task involved the preparation
and submission of a DOE-required general industrial stormwater pollution prevention plan
(SWPPP) for the City's Corporation Yard on B Street. In addition, a storm drain vacuum
truck decant station was designed for connection to the sanitary sewer. This task has been
completed.
. Task 5.1 - Septage Receiving Station. This directed service involved a review of the
septage receiving facility at the WWTP and pre-design work for improvements. This task
requires additional design work, which will be addressed in Amendment No.1.
. Task 5.2 - Odor Control. This directed service involved investigating the source of odor at
the WWTP and responding to a Olympic Region Clean Air Agency request to corne up
with a plan to address the issue. Initial work has been completed, and final technical memo
will be completed under Amendment No.1.
. Task 5.3 - Review of Head works and Rotary Blowers Equipment. B&C is being asked to
complete a product review of equipment that will be purchased and installed this year, so
that there are no conflicts with WWTP improvements proposed as part of the CSO Plan.
This work will be funded by Amendment No.1.
. Task 5.4 - Final Re-Rating Report. Under Amendment No.1, B&C will finalize are-rating
report and submit to DOE for approval.
. Task 6 - EUGA Sewer Construction Support Services. This is a new task involving design
support during construction such as submittal review, request for information review,
coordination meeting participation, etc. Amendment No.1 includes a not-to-exceed amount
of $50,000.
A summary of the tasks and budgets are listed in Table 1 below.
The design and construction support ofthe EUGA Sewer work (Tasks 3 and 6) are funded by
Clallam County. The City is managing the design and construction support work and
reimbursement will be made through the Interlocal Agreement that has been executed between the
City and County. Funding for the other tasks, as well as directed services, are included in the
approved 2006 and 2007 Wastewater Utility budgets. The duration of the Agreement will be
through December 31, 2007, and based on the completion of all tasks.
It is requested that the UAC forward a favorable recommendation to City CounCil to authorize the
Mayor to sign Amendment No. 1 to the Agreement 06-05 with Brown and Caldwell, increasing the
maximum compensation amount under the agreement by $187,000, from $850,000 to $1,037,000.
Table 1 - Tasks and Fees
Task Description Original Task Amended Task Fee
Fee
1. CSO Comprehensive Reduction Plan Update (done) $25,000 $27,000
2. Update to General Sewer Plan (done) $50,000 $45,000
3. East UGA Sewer Extension (Funding by $670,000 $760,000
Clallam County)
4. Industrial SWPPP and Wash-Down Facility (done) $55,000 $60,000
5. Other Services as Directed $50,000 $95,000
5.1 Septage Receiving Station (expended) $35,000 $65,000
5.2 Odor Control (expended) $7,000 $10,000
5.3 Review of headworks and rotary blowers (expended) $0 $3,000
5.4 Final Re-Rating Report (expended) $0 $15,000
6. EUGA Sewer Construction Support Services (Funding $0 $50,000
by Clallam County)
Totals $850,000 $1,037,000
N:\UAC\Final\Amend I to B&C Agreement 06-05.doc
Date:
To:
From:
Subject:
FORTAN ELES
WAS H I N G TON, u. S. A.
Utility Advisory Committee Memo
April 9, 2007
Utility Advisory Committee
Stephen Sperr, P.E., Engineering Manager
Detailed Design of Phase 1 CSO Projects,
Brown and Caldwell Consultant Agreement Amendment No.2, Project 06-01
Summary: In July 2006 the City selected the engineering firm of Brown and Caldwell to
complete the pre-design of several Combined Sewer Overflow (CSO) projects, now referred to as
Phase 1 CSO Projects. The pre-design effort for Phase 1 has been completed and detailed design
ofthe Phase 1 CSO Projects must begin to meet DOE compliance schedules.
Recommendation: Forward a favorable recommendation to City Council to authorize the
Mayor to sign Amendment No.2 to the Agreement with Brown and Caldwell for the detailed
design of Phase 1 CSO Projects, increasing the maximum compensation amount under the
agreement by $1,320,000, from $425,000 to $1,745,000.00.
Background/Analysis: The City negotiated with the Washington Department of Ecology an
updated CSO Reduction Facilities Plan/General Sewer Plan (CSO Plan), dated June 2006, and
signed Agreed Order 3853 in October 2006. From July 2006 through March 2007, Brown and
Caldwell completed the pre-design ofthe first five CSO projects (known as Phase 1) under that
CSO Plan:
. Francis Street Sewer Main
. Storage Tank Modifications
. Force Mains from Pump Station 4
. Front Street Sewer Main
· Wastewater Treatment Plant and Outfall Modifications
The pre-design effort was needed to (1) evaluate different route possibilities for the Francis Street
sewer line, (2) further refine the relationship between the Phase 1 projects, including where cost
savings may be obtained for the group of projects using joint permitting, etc., and (3) revise overall
project costs and the project schedule. The Agreement with Brown and Caldwell was originally
for $339,000, and was amended once in February 2007 to allow completion of additional design
work, for a total pre-design cost for Phase 1 of $425,000.
B & C Agreement Amendment No.2
April 9, 2007
Page 2
Amendment No.2 to the Agreement will allow Brown and Caldwell to continue and complete the
design ofthe Phase I projects. Table 1 below summarizes the costs associated with the Phase 1
projects:
Table 1 - Summary of Phase 1 CSO Project Costs
Project Pre-design Cost Detailed Design Estimated
Cost Construction Cost
Francis Street Sewer Main $2,930,000
Storage Tank Modifications $3,500,000
Force Mains from Pump Station 4 $425,000 $1,320,000 $5,060,000
Front Street Sewer Main $2,550,000
WWTP and Outfall Modifications $1,730,000
Totals: $425,000 (3%*) $1,320,000 (8%) $15,770,000'
* - percentage of overall cost of $16.2M for Phase 1
Table 2 - Summary of Amendment No.2 Tasks and Budgets
Task Budget
1. Project Management $96,000
2. Survey and Base Mapping $74,000
3. Cultural Resources Consultation $16,000
4. Geotechnical Engineering $79,000
5. Permitting and Environmental $114,000
6. Preparation of Contract Documents $13,000
6.1 Civil Design $351,000
6.2 Mechanical Design $175,000
6.3 Structural Design $118,000
6.4 Electrical Design $115,000
6.5 Instrumentation and Control Design $105,000
6.6 Preparation of Cost Estimate $47,000
7. Bidding Assistance $13,000
Total $1,316,000
B & C Agreement Amendment No.2
Apri19,2007
Page 3
Funds for a portion of the design work are covered by the combination of a low interest design
loan secured from the Public Works Trust Fund (PWTF) and Wastewater Utility rates. An
additional design loan is in the process of being applied for. A PWTF construction loan has also
been obtained for a portion of the construction cost, and other loans and grants are being applied
for to cover the remaining construction cost. More information on these loans will be presented as
part of a separate UAC memo at this April 9 meeting addressing the next PWTF loan cycle.
It is requested that the UAC forward a favorable recommendation to City Council to authorize the
Mayor to sign Amendment No.2 to the Agreement with Brown and Caldwell for detailed design
of Phase 1 CSO Projects, increasing the maximum compensation amount under the agreement by
$1,320,000, from $425,000 to $1,745,000.00.
FORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
Date:
Apri19,2007
To:
Utility Advisory Committee
From:
Stephen Sperr, P.E., Engineering Manager
Subject:
Public Works Trust Fund Loan Application for CSO Phase 1 Projects
Summary: The City is pursuing two additional Washington State Public Works Trust Fund
(PWTF) loans to assist in funding $19M in Combined Sewer Overflow (CSO) Phase 1 Projects.
The applications for both of these PWTF loans, Pre-Construction (Design) and Construction are
due on or before May 7, 2007.
Recommendation: Forward a favorable recommendation to City Council to authorize the
Mayor to (1) sign a PWTF Pre-Construction Loan Application certification, in an amount
not to exceed $885,000, and (2) sign a PWTF Construction Loan Application certification, in
an amount not to exceed $10,000,000. In addition, if either or both loans are approved,
authorize the Mayor to execute the agreement(s).
Background/Analysis: The City is pursuing additional Washington State Public Works Trust
Fund (PWTF) loans to assist in funding $19M in Combined Sewer Overflow (CSO) Phase 1
Projects. Applications for both pre-construction (design) loans and construction loan applications
annually are due on or before May 7. The total cost for the five Phase 1 projects is approximately
$19 million - see Table 1 below for a breakdown of the costs.
The City plans to submit an application for a PWTF Pre-Construction loan by March 5, 2007, in
the amount of$885,000 to cover the remaining design costs not covered by the initial loan we have
received. In addition, a PWTF Construction loan application to cover $10,000,000 (the PWTF
loan limit amount) of the remaining construction cost of the five Phase 1 projects will be submitted
before the annual construction loan application deadline of May 7, 2007.
To fully fund the construction of these five projects, even ifthe full amount ofthe requested
PWTF loan amounts is obtained, another $3.8 million is needed in 2008. Table 2 includes a
breakdown of the funding scenario for Phase 1.
N:\UAC\DepDir\PWTF Loan Application for CSO Phase I.doc
PWTF Loan Application for CSO Phase 1
Apri19,2007
. Page 2 of2
Project, Pre-design Cost Detailed Design Estimated
Cost Construction Cost
Francis Street Sewer Main $2,930,000
Storage Tank Modifications $3,500,000
Force Mains from Pump Station 4 $425,000 $1,320,000 $5,060,000
Front Street Sewer Main $2,550,000
WWTP and Outfall Modifications $1,730,000
Subtotals: $425,000 $1,320,000 $15,770,000
Property Purchase Cost + $1,625,000
Total Cost, Phase 1 $19,140,000
Table 1 - Summary of Phase 1 CSO Project Costs
Source Amount Local Match Total
(Rates)
A. Loans Obtained
PWTF Pre-Construction Loan $590,000 $110,000 $700,000
PWTF Construction Loan $1,875,000 $340,000 $2,215,000
Subtotal: $2,915,000
B. Additional PWTF Requested by May 7
PWTF Pre-Construction Loan $885,000 $160,000 $1,045,000
PWTF Construction Loan $10,000,000 $1,800,000 $11,800,000
Subtotal $12,845,000
C. Additional Fundine Needed $3,380,000
D. Possible Sources
Federal STAG Grant $1,500,000
Dept. of Ecology SRF Loan up to $5,000,000 15 % match
Wastewater Bond
Table 2 - Funding
It is requested that the UAC forward a favorable recommendation to City Council to authorize the
Mayor to (1) sign a PWTF Pre-Construction Loan Application certification, in an amount not to
exceed $885,000, and (2) sign a PWTF Construction Loan Application certification, in an amount
not to exceed $10,000,000. ill addition, if either or both loans are approved, authorize the Mayor
to execute the agreement(s).
Date:
To:
From:
Subject:
~ORTANGELES
WAS H I N G TON, U. S. A.
Utility Advisory Committee Memo
April 9, 2007
Utility Advisory Committee
Gary W. Kenworthy P.E., Deputy Director of Public Works/City Engineer
Stormwater Utility Rates Continued, Additional Requested Information
Summary: This is a continuation of discussions started in May 2006 regarding the need for added
funding for the Stormwater Utility.
Recommendation: Continue the discussion regarding the funding needs, capital program,
and rate options and provide direction to staff for future action.
Background/Analysis: At the March 13,2007 only limited time was available for discussion of the
Stormwater Utility rates. It was decided to continue the discussion at the next regular UAC meeting
and it was requested that additional information be provided regarding: 1. When the rates need to be
set in time to be included in the 2008 tax mailing; 2. Possible Mitigation Credits; 3. Proposed 2 year
budget for the Stormwater Utility; and 4. Develop a model to allow investigation of various rate
options.
The deadline for the 2008 tax mailing is November 2007. A rate analysis model has been developed
to allow UAC members the opportunity to investigate revenue impacts of various combinations of
base rates, cap limits, and impervious area changes.
Weare preparing a proposed two year budget and investigating rate adjustments for stormwater
runoff mitigation measures installed by property owners. These will be distributed at the meeting if
requested information from other municipalities regarding these items are received in time.
Additional copies of the March 13,2007 UAC memo on Stormwater Utility Rates will be available
at the meeting.
Stormwater Rates 2007
March 13, 2007
Page 2/3
Stormwater Revenue Calculator
Model Current
Residential Customers 6,589 6,589
Non-Residential Customers 1,546 1,546
Monthly Rate per Res. ERU $3 $3
Monthly Rate per Non-ResERU $3 $3
Impervious ERU area (s.f.) 4,000 4,000
Total Residential Impervious Area 14,455,923 38% 14,455,923 38%
Total Non-Residential Impervious Area 23,417,675 62% 23,417,675 62%
Total Impervious Areas 37,873,599 100% 37,873,599 100%
Impervious Area ERU Cap 10 10
Estimated Annual Residential Revenue $237,204 61% $234,842 65%
Estimated Annual Non-Residential Revenue $149,684 39% $125,238 35%
Total Estimated Annual Revenues $386,888 100% $360,080 100%
Less Utility(8%) & Proc.(1 %) $34,820 $32,407
Net Revenue . tt-"",,, All>(, $327,673
Sample Model Runs
$3 $4 $5 $6 $3 $3 $4 $4 $4 $4 $4 $4
$3 $4 $5 $6 $3 $3 $4 $4 $4 $4 $4 $4
4,000 4,000 4,000 4,000 3,000 2,000 2,000 2,000 2,000 2,000 2,500 3,000
38% 38% 38% 38% 38% 38% 38% 38% 38% 38% 38% 38%
62% 62% 62% 62% 62% 62% 62% 62% 62% 62% 62% 62%
10 10 10 10 10 10 10 20 50 1,000 1,000 1,000
61% 61% 61% 61% 57% 51% 51% 46% 42% 36% 41% 45%
39% 39% 39% 39% 43% 49% 49% 54% 58% 64% 59% 55%
I~?J:" .f\CO $469,424 $586,780 $704,137 $378,175 $425,262 $567,017 $624,893 $693,463 $809.985 1$7.09,Q11 $642,283
N :\UAC\Final\Stormwater Rates 2007 -I.doc
Stormwater Rates 2007
March 13,2007
Page 3/3
Stormwater Utility Budgets, Current, 2007 Proposed Revision, and 2008.
Stormwater Utility Budgets Table
Description Current 2007 Proposed 2008
Personnel $0 $100,000 $200,000
Services $18,756 $30,000 $50,000
Intergovernmental $98,900 $98,900 $50,000
Construction $280,000 $280,000 $400,000
Totals $397,656 $508,900 $700,000
The increases shown for 2007 reflect the Council authorized engineering position to assist in the
implementation of the NPDES Phase II Stormwater requirements. In 2008 the increases reflect
anticipated additional personnel efforts required in planning and street maintenance. In addition we
will need to show added efforts in construction towards water quality at stream and marine outfalls.
N :\UAC\Final\Stormwater Rates 2007 -I.doc