Loading...
HomeMy WebLinkAboutAgenda Packet 05/13/2003 PORT ANGELES, WA CJB362 MAY 1 ."4, 2003 3:00 Ar~FNDA I. r-AL/ To ORDER II. ROLL CALL III. APPROVAL OF' MINUTES FOR APRIL ~:1~ IV. LATE ITEMS c. PARAMETRIX ~003 CONTRA[3T D, F'LM ORIDATIr'~N UPDATE VI. NEXT MEETING DATE - 'IUNE '1 Or VII. ADJOURNMENT UTILITY ADVISORY COMMITTEE Port Angeles, Washington April 8, 2003 ~ I. Call to Order: Chairman Erickson called the meeting to order at 3:00 p.m. II. Roll Call: Members Present: Chairman Erickson, Councilmember Rogers, Dean Reed, Allen Bentley, Councilman Campbell Members Absent: None Staff Present: Mike Quinn (4.00), Craig Knutson, Glenn Cutler, Scott McLain, Steve Sperr, Lan'y Dunbar, Doyle McGinley, Jim Harper, Bob Kajfasz, Cate Rinehart Others Present: Brian Gawley - Daily News Mark Eveland - Air Flo Heating IIL Approval of Minutes: Chairman Erickson asked if there were any additions or corrections to the meeting of March 5, 2003. Allen Bentley noted a change in discussion item "B" from "and information is gatherer" corrected to "as information is gathered." Dean Reed moved to approve the minutes. Allen Bentley seconded the motion, which carried unanimously. IV. Discussion Items Elwha Underground Rebuild Phase I - Project 22-11 James Harper, Electrical Engineering Manager, explained that the water pumping facility at the Ranney Well is served by an old 2.5 mile direct buried 12.47 kV line which has been periodically failing. Rebuilding this line in three phases over a three year period will stabilize this area. The rebuild of this line was proposed and included in the approved 2002 CFP. A brief discussion followed. Dean Reed moved to recommend staff proceed with the Elwha Underground Rebuild Phase I Project 22-11 as described. Allen Bentley seconded the motion, which carried unanimously. UTILITY ADVISORY COMMITTEE April 8, 2O03 B. Water Quality Report (2002) Doyle McGinley, Water/Wastewater Collection Superintendent, noted the Washington State Department of Health requires every water system provide an annual Water Quality Report to its customers. Mandatory language use includes water system information, water quality testing occurring daily by certified personnel, monitoring waivers, bilaterial compliance agreements and where to get more information. The report is scheduled to be included in utility bills, on the interact, and a public information announcement in the local paper. There was no discussion No action taken. Information only. C. Solar Water Heating Program Agreements Larry Dunbar, Power Resources Manager, announced the availability of a solar water heating program for residential customers called "The Bright Way To Heat Water." The first two customers would receive 75% funding, agree to a lien filed against their home with repayment of RD&D (Renewable Resource Research, Development and Demonstration) funding to the City upon the sale of their home, and be required to read and report metering data to the City on a monthly basis for three years. Subsequent customers would receive an $800 rebate (no lien and no report requirement). A discussion followed. Councilman Campbell moved to recommend City Council approve The Bright Way To Iteat Water License Agreement with the Bonneville Power Administration and authorize the Director of Public Works and Utilities, or his designee, to enter into Amendment No. 1 of the City Authorized Contractor Agreement with eligible contractors. Additionally the lien is to be lifted at the end of the third year if all requirements are met. Couneilmember Rogers seconded the motion, which carried unanimously. D. Downtown Watermain/Sidewalks Phase III, Project 00-19, Loan Application Stephen Sperr, Engineering Manager, mentioned the loan application had been submitted previously but did not make the list of funded projects. This year in addition to the application for the Public Works Trust Fund (PWTF) loan, the City will also apply for a Drinking Water State Revolving Fund (DWSRF) loan. A discussion followed with staff being advised to keep the comprehensive parking solution in mind as well as the potential preservation of the limited underground area. It was noted that should funding become available the City would have some flexibility in the project. Councilmember Rogers moved to recommend City Council authorize the Mayor sign both the PWTF and DWSRF loan application certifications in an amount not to exceed $2,600,000 for Phase III of the Downtown Watermain/Sidewalk Replacement Project. In addition, if either or both the loans are approved, authorize the Mayor to execute the PWTF and/or DWSRF loan agreement(s) provided that the total loan amount does not exceed $2,600,000. Allen Bentley seconded the motion, which carried unanimously. 2 UTILITY ADVISORY COMMITTEE April 8, 2003 E. Consultant Agreement with Brown and Caldwell For Engineering Services Stephen Spent, Engineering Manager, stated Brown and Caldwell had been selected to continue to provide engineering services related to the Infiltration/Inflow Roof Drain Disconnection Pilot, a Condition Assessment of the Sewer Collection System, an update to the Combined Sewer Overflow Comprehensive Reduction Plan and other services as directed. A discussion followed. Staff was directed to include examples of each task in the summary of scope and budget when presented to Council. Dean Reed moved to recommend City Council authorize the Mayor to sign an Agreement for Professional Services with Brown and Caldwell in an amount not to exceed $159,920. Councilmember Rogers seconded the motion, which carried unanimously. F. Elwha River Salmon Hatchery Lease Stephen Spent, Engineering Manager, described the Washington Department of Fish and Wldlife (WDFW) operation of a fish rearing facility on leased City Property adjacent to the Elwha River and the City's Industrial Water Line (IWL). The lease allowing them to operate on the site and use a portion of the water diverted from the Elwha River IWL expired in March 2003 and a new three year lease is being negotiated. New issues to be addressed include the Habitat Conservation Plan, fish screens, permitting and construction of facilities under the Elwha Act, and use of City water. A lengthy discussion followed with concerns expressed over the lack of WDFW cooperation in obtaining permits for city and Daishowa projects, especially in the last several years. A letter to them outlining those concerns was suggested by members of the UAC. Tabled until further notice. G. Clallam PUD Wholesale Water Contract Scott McLain, Deputy Director for Power Systems, advised that the Clallam County PUD had been receiving wholesale water service from the City for many years and the last agreement terminated at the end of 2002. The new three year contract addresses a number of changes which are improvements to the previous contract. This contract is currently being reviewed by the PUD. There was a brief discussion. Councilman Campbell moved to recommend City Council authorize the Mayor to sign the Wholesale Water Contract with the Clallam County PUD providing no significant changes occurred due to PUD action. Dean Reed seconded the motion, which carried unanimously. H. Reports Rayonier Leachate (Quarterly) Fluoridation Project Status Glenn Cutler, Director of Public Works and Utilities, reported a draft was being designed by CH2M Hill. Currently the plant would be located adjacent to the landfill area and would be in liquid form. Brownsfields Clean-Up Grant Application Glenn Cutler, Director of Public Works and Utilities, advised the EPA money for the landfill bluffhad 3 UTiLITY ADVISORY COMMITTEE April 8, 2003 been denied. F. Next Meeting: The next meeting will be May 13, 2003. VI. Adjournment: The meeting adjourned at 5:05 p.m. Councilmember Erickson, Chairman Cate Rinehart, Administrative Assistant 4/10/03 N:WWKS~LIGHTXCONS\CATE~apr8meet.wpd 4 pORTANGELES WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: May 9, 2003 TO: UTILITY ADVISORY COMMITTEE FROM: Scott McLain, Deputy Director for Power Systems Attached is your packet for the Utility Advisory Committee Meeting on Tuesday, May 13th. Item A in the packet is a memo concerning construction of an Oil Handling and Warehouse building. While we are presenting several recommendations with regard to the project, some of which could produce as much as a $45,000 increase, it is Glenn's intention to fully discuss each option before any formal recommendation is forwarded to the City Council. N:\UACWinalXcovermemo.wpd WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: May 13, 2003 TO: UTILITY ADVISORY COMMITTEE FROM: Jatnes L. Harper, Electrical Engineering Manager Re: Construction of Oil Handling and Warehouse Building, CL 82-99 Summary: EPA regulations require indoor storage for leaking or weeping transformers and for drums of oil. A building to satisfy this requirement was included in the 2003 construction budget in an mount of $94,000. The design engineers estimate for construction is $157,431, of which $34,624 are recommended added items. The estimated cost of construction without the added items is $122,807. Recommendation: Forward a favorable recommendation to the City Council that $45,000 in additional funds be allocated from light reserves, ($29,000 for added cost of the building plus $16,000 for the addition of an oil impervious liner), and that staff proceed with bidding for the construction of the Oil Handling and Warehouse building. Background/Analysis: This item is being returned for UAC review because the consultant's estimate for construction of the Oil Handling and Warehouse Building, Project 02-I 0 exceeds the budgeted funds by $29,000 or 31%, excluding three added items recommended by the consultant. The three added items recommended by the consultant to be incorporated into the design will cost an additional $34,624. The cost / benefit of each added item discussed below requires consideration, approval, and additional fund allocation prior to finalizing the design and bidding o f the project. The cost of the building was under estimated by staff due to a lack of experience in building construction, and especially specialty building construction. Future projects of types which staff has limited experience will incorporate a preliminary construction cost estimate by the consultant as the first design task. This will allow consideration of more accurate total project cost prior to appreciable design expenditures. The consultant recommends the installation of a 40 mil PVC oil resistant liner with sand cushion under the concrete slab floor to assure containment of spilled liquids through any potential cracks or joints. The installed liner is estimated to cost approximately $16,000. Staffrecommends this added item be approved as insurance against migration into the surrounding soil of any of the hazardous materials to be stored and handled in the building. N:\UAC~Finahuacwarhs2.wpd Design Services for Oil Handling and Warehouse Building Page 2 May 13, 2003 The consultant recommends a restroom be installed at a cost of $10,000 due to the approximate one block distance to available facilities. Staffrecommends the restroom rough-in and floor accommodations be included and the construction be deferred at this time. The area in front of the proposed building is currently paved with asphalt but is not continued to the adjacent streets. The consultant recommends installing asphalt paving at a cost of $7,000 to tie the existing asphalt to the paved streets. Staffrecommends this be deferred until determined to be necessary for access. The current gravel surface is the minimum acceptable. EPA Regulation 40 CFR Part 761.65 requires any leaking or weeping transformers or drums of liquid to be stored under cover and out of the weather. The City does not have sufficient indoor storage space to hold the number of transformers and oil filled equipment routinely in storage. The City has numerous large oil filled units subject to being retrofilled and reclassified as non PCB. These units can be retrofilled and reclassified for only the cost of the oil plus labor and oil disposal in the new facility. The City will have the oppommity to experience significant savings by doing this work in house, and the potential of fines and citations will be reduced if not eliminated. Staffhas explored other possible options for meeting EPA requirements. The possibility of Clallam PUD processing City transformers on a contract basis was discussed. The PUD facility has limited space and would frequently be unable to accept City equipment. Tacoma has the next closest facility which would always be available. However, this would require processing a hazardous material transport manifest and sending a truck to Tacoma several times a week, exposing the City to the added liability of a spill during transit. The cost of the building is still considerably below the $480,000 estimated cost of shipping the PCB transformers to Tacoma for storage and handling. The agreement with Parametrix, Inc. for design of the Oil Handling and Warehouse Building at a cost not to exceed $25,600 was approved by Council on November 19, 2002. The cost to date for Parametrix is $18,336.37. The remaining tasks are approximately $600 for final bid package preparation and up to approximately $2,100 for bid evaluation assistance as needed. The design has been completed, and the engineering estimate for construction of the building including added items is $157,431, which is $63,431 greater than the $94,000 budgeted amount. The estimated construction cost of the building without the added items is $122,807 which exceeds the budgeted amount by $29,000. Design ServicesforOilHandling and Warehouse Building Page 3 May 13, 2003 ~O COST ITEM BUDGET ESTIMATE ENGINEER ESTIMATE DIFFERENCE OF STAFF RECOMMENDATION 1 Mobilization $5.000.0(3 $5,000.00 2 Water System $1,000.00 $2,000.00 3 Sewer System $2,000.0(3 $3,000,00 4 Electrical System $6,000.0~ $9,000.00 5 Unsuitable Soil Replacement $3,500.00 6 Structural Excavation $6,000,00 7 Concrete & Reinforcement $20,000.00 $25,000.00 8 Metal Building $60,000.0(3 $60,000,00 Sum Required Items $94,000.0(3 $113,500,00 $19,500.00 Sales Tax Required Items~ $9,307,00 $9,307.00 Subtotal Required Items $94,000.001 $122,807,00 $28,807.00 ADDED ITEMS $15,000,00 g Oil resistant PVC Liner $15,000.00 1(3Restroom $10,000,00 11 AC Pavement $7,000,00 Sum Added Items $0.0¢ $32,000.0(3 $15,000.00 Sales Tax $0.00 $2,624.00 $1,230.00 Subtotal Added Items $0.00 $34,624,00~ $16,230.00 Total $94,000.00 $157,431,00 $45,037.00 It is recommended that the UAC forward a positive recommendation to the City Council that $45,000 in additional funds bc allocated from light reserves, ($29,000 for added cost of the building plus $16,000 for the addition of an oil impervious liner), and that staffproceed with bidding for the construction of the Oil Handling and Warehouse building. WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: May 13, 2003 TO: UTILITY ADVISORY COMMITTEE FROM: Larry Dunbar, Power Resources Manager SUBJECT: Solar Water Heating Program Agreements Summary: The Bonneville Power Administration recently offered the City participation in a xu'n-key solar water heating program for residential customers called "The Bright Way To Heat [aterTM''. ,evised Recommendation: Forward a favorable recommendation to approve the Bright Way To Heat WaterTM License Agreement with the Bonneville Power Administration and authorize the Director of Public Works and Utilities, or his designee, to ,e. nter into Amendment No. 1 of the City Authorized Contractor Agreement with eligible contractors. Background: On April 12, 2001, the City Council authorized the Director of Public Works and Utilities to implement a conservation program that qualifies for the Bonneville Power Administration (BPA) Conservation and Renewables Discount (C&RD) program. On May 22, 2001, the City Council authorized the Director of Public Works and Utilities to enter into City Authorized Contractor Agreements with local independent contractors that install eligible conservation improvements. On April 8, 2003, the Utility Advisory Committee recommended "approve The Bright Way To Heat WaterTM license agreement with the Bonneville Power Administration and authorize the Director of Public Works and Utilities, or his designee, to enter into amendment No. 1 of the City Authorized Contractor agreement with eligible contractors. Additionally the lien is to be lifted at the end of the third year if all requirements are met" to City Council. Analysis: Staff inadvertently overlooked the prior City Council delegation to the Public Works and Utilities Director to implement conservation programs and requests the utility advisory committee to consider the revised recommendation herein. The revised recommendation in strikeout/underline format is to "approve The Bright Way To Heat WaterTM license agreement with the Bonneville Power Administration and authorize the Director of Public Works and Utilities, or his designee, to enter into amendment No. 1 of the City Authorized Contractor agreement with eligible contractors y~,~ ,~ ,,,~ ~uu,~,,~.L~ ,~ .~,.L . Additional information about staff's revised plans for customer rebates and a lien related to the renewable resource research, development and demonstration program is provided on the following page. I:~STAFFREPORTSLSOL~RWATER~IEATIlqG WPD May 13, 2003 Utility Advisory Committee RE: Solar Water Heating Program Agreements Page 2 Renewable resource research, development and demonstration funding In order to help ensure that a solar water heating program is successful, Staff proposes to combine the $800 C&RD rebate for a solar water heater system with C&RD renewable resource research, development and demonstration (RD&D) funding for two installations this year. The anticipated total cost of a solar water heating system is in the range of $4,500 to $5,000. By combining the C&RD and RD&D funds thc customer's initial cost would be 50% (the former plan was 75%) of total cost (in the range of $2,250 to $2,500). The Eugene Water and Electric Board program when combined with thc Oregon income tax credit provides an overall incentive of 50% which has resulted in numerous installations. Use of RD&D funding in subsequent years in support of The Bright Way To Heat WaterTM program may also be appropriate. Customers receiving RD&D funding would be required to read and report solar water heating system metering data to the City on a monthly basis through September 30, 2006. The required metering would be provided by the City which also qualifies for RD&D funding. As a condition of RD&D funding, Bonneville requires that metering dat~ be made available to the public in an anonymous format via the world-wide-web. In the event a customer does not comply with the meter reading and reporting requirements, a lien would require customer repayment of thc RD&D funding upon the sale of the home. Customer repayment of the RD&D funds (if required) would be applied to the City's Conservation fund. A total of $20,000 in RD&D funding is available under thc C&RD program. All City costs under the C&RD and RD&D are reimbursed by BPA. Staff, in cooperation with Air Flo Heating Company, plans to hold a solar water heating workshop in June to promote the availability of the program and to recruit two customers to participate in this year's RD&D activities. Customers participating in the RD&D activity will be selected based on solar access, adequate family size/water heating demand, ease of installation, and other factors. WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: May 13, 2003 TO: UTILITY ADVISORY COMMITTEE FROM: Stephen Sperr, Engineering Manager SUBJECT: Consultant Agreement with Parametrix, Inc. for Engineering Services Summary: Parametrix, Inc. has been selected to continue to provide engineering services related to the Solid Waste Utility, Landfill and Wastewater Treatment Plant (WWTP), including directed services. The Agreement will ensure that ongoing engineering services needed to support solid waste activities, landfill closure plans and NPDES permit requirements for the WWTP provided by Parametrix will continue. The Agreement has a not-to-exceed mount of $222,383. Recommendation: Forward a favorable recommendation to City Council authorizing the Mayor to sign an Agreement for Professional Services with Parametrix. Background/Analysis: On October 26, 2000, the City signed an Agreement for Professional Services with Parametrix Inc. to provide engineering support services for 6 landfill and solid waste tasks, for a total of $295,284.00. On May 3, 2002 the Agreement was amended, adding 8 additional tasks and increasing the total amount of the Agreement to $607,970.00. Amendment No. 1 also extended the time of performance for the Agreement to March 31, 2003. Most of the 14 tasks have either been completed or are nearing completion. Recently, the City has been working with Parametrix in developing a scope and budget for the continuation of services for existing tasks, and new tasks that are funded as part of the City's 2003 budget. Instead of amending the existing Agreement, it was clear that the best approach to addressing the remaining work and the new tasks was to execute a new Agreement. Continuing with Parametrix is in the best interest of the City due to their in-depth knowledge of existing City programs and projects. City staff are satisfied with Parametrix's expertise and ongoing engineering support services in the solid waste, landfill, and wastewater treatment plant areas. Table 1 outlines the key tasks in the proposed new Agreement, with 2003 budgets and estimated 2004 budget. The source of funding for each task is listed in parentheses after each task title (SW is the Solid Waste Fund and WW is the Wastewater Fund). The funding for tasks anticipated to continue into or start in 2004 will be added to the Agreement as funds are made available, through an Amendment(s) to the Agreement. May 13, 2003 UAC 2003 Parametrix Consultant Agreement Page 2 of 2 Table 1 - Summary of Scope and Budget 2003 City 2003 Task TASK Bud~let Amount 1. Engineering Assistance for Solid Waste $70,000 $61,495 Management ($15K WW, $55K SW) 2. Landfill Compliance Support (SW) $35,000 $29,811 3. Waste Export System Development (SW) $35,000 $19,152 4. Shoreline Stabilization (SW) $125,000 $18,103 5. WWTP NPDES Services (WW) $50,000 $43,090 6. Site Development Planning (SW) $0 $24,235 7. Directed Services (SW) $50,000 $26,499 Total $365,000 $222,383 · Task l supports routine solid waste handling activities and landfill operations. Examples of this would be (1) update the landfill fill sequence plans, (2) gas system maintenance and monitoring and (3) co-composting consulting services. · Task 2 provides for regulatory reporting and permit coordination for landfill operations. Examples of this would be (1) preparation of the Solid Waste Annual Report and (2) preparation of groundwater monitoring reports. · Task 3 provides for technical assistance in developing a waste export system for solid waste disposal for the proposed Transfer Station. Some specific components of this task are (1) development of Interlocal Agreements for the commitment of waste streams to the proposed Transfer Station and (2) updating the Solid Waste Long Range Plan. · Task 4 will develop design and permit documents to mitigate erosion of waste along the base of the bluff north of the old landfill. · Task 5 involves sediments sampling and reporting, as well as an outfall evaluation, to meet NPDES permit requirements for the Wastewater Treatment Plant. · Task 6 provides for technical assistance related to the impacts that the potential siting of a new municipal water treatment plant on or adjacent to the landfill property would have on current operations and planned facilities there. The duration of the Agreement will be through January 31, 2004. Funds for the tasks are in the 2003 budget or will be requested in future budgets. Tasks will only be executed when funds become available. If progress on tasks during 2003 is satisfactory, the Agreement will likely be amended in 2004 to include wastewater design work budgeted for that year. N:\UAC~DepDirhMay 13 new Parametrix Agrecm~nt~wpd WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: May 13, 2003 TO: UTILITY ADVISORY COMMITTEE FROM: Stephen Sperr, Engineering Manager Re: Fluoridation Memorandum of Understanding Summary: The City has negotiated a Memorandum of Understanding 0ViOU) with the Washington Dental Service Foundation (WDSF) whereby they would "gifl" a temporary fluoride facility to the City. Concurrent with development of the'MOU, CH2M Hill and the WDSF are developing a design/build agreement whereby CH2M Hill will design and construct the temporary fluoride facility. Recommendation: Forward a favorable recommendation to City Council authorizing the Mayor to sign a Memorandum of Understanding with the Washington Dental Services Foundation to expedite the funding and construction of a fluoridation system. Background/Analysis: The WDSF selected the City as a candidate beneficiary of grant funding for fluoride in late 2002, as part of WDSF's charitable mission to improve the oral health of Washington State residents. At the time, the City did not have any near-term plans to install a fluoride system when it was approached by the WDSF and local health care professionals supporting fluoridation of the City's water supply. The issue was presented by a group from Olympic Medical Center to the Utility Advisory Committee at its January 14, 2003 meeting. The UAC recommended that City Council address the issue at its next meeting. After City Council discussions and a public hearing, the City Council directed the installation of a fluoride facility using grant funding from WDSF. The City will operate a temporary facility to feed fluoride to the City's municipal water system until the proposed future water treatment facility, to be funded and constructed by the federal government as part of the Elwha Dam Removal project, is constructed and operational. Customers of the City's municipal water system, including PUD No. 1 of Clallam County, will be supplied with fluoridated water. The future water treatment facility, expected to be completed by the year 2007, will include a permanent fluoride feed system. Upon completion of the future water treatment facility, the temporary fluoride facility will be abandoned and its component equipment and instrumentation salvaged for use in the water treatment facility or elsewhere. Fluoridation MOU May 13, 2003 UAC Page 2 of 2 The City has negotiated a MOU with the WDSF whereby they would "girl" a temporary fluoride facility to the City. A copy of the MOU is attached. Concurrent with development of the MOU, CH2M Hill and the WDSF are developing a design/build agreement whereby CH2M Hill will design and construct the temporary fluoride facility. It is recommended that the UAC forward a favorable recommendation to City Council authorizing the Mayor to sign a Memorandum of Understanding with the Washington Dental Service Foundation to expedite the funding and construction of a fluoridation system. N:\UACheinalkMay 13 Fluoridation MOU.wpd MEMORANDUM OF UNDERSTANDING REGARDING GIFT OF FLUORIDATION SYSTEM The purpose of this Memorandum of Understanding (the "MOU") is to set forth the nonbinding understanding of Washington Dental Service Foundation, LLC, a Washington limited liability company ("WDSF"), the City of Port Angeles, Washington, a municipality (the "City"), and CH2M Hill, a corporation of the State of Washington, with respect to a contemplated gift by WDSF to the City ora fluoridation system to be designed, constructed and installed by the engineering firm CH2M Hill. 1. In furtherance of WDSF's charitable mission to improve the oral health of Washington State residents, WDSF intends to enter into an agreement with CH2M Hill for the construction ora fluoridation system to fluoridate the public water supply of the City (the "System"), with the further intention of gifting the System to the City. 2. WDSF intends to enter into a design-build agreement with CH2M Hill (the "Design- Build Agreement") for the design, construction and installation of the System. WDSF will pay the design, construction and installation costs associated with the System, in an amount that is mutually agreeable to all parties and will be finalized in the Design-Build Agreement. The parties understand that WDSF has allotted a total of $260,000 for the design, construction and installation of the System and that WDSF will not be expected to pay for any amounts in connection with the design, construction and installation of the System that exceed this total allotted amount. 3. The Design-Build Agreement will require that CH2M Hill work closely with and under the general advice and supervision of representatives designated by the City, as necessary, to ensure that the System is designed, constructed and installed in compliance with applicable federal, state and local health and safety laws concerning fluoridation of a public water supply. 4. As a pre-condition to WDSF entering into the Design-Build Agreement with CH2M Hill, the City shall have received approval from any and all applicable governing bodies, including but not limited to the Port Angeles City Council, for the design, construction and installation of the System, the fluoridation of the Port Angeles public water supply, and the gift of the System from WDSF to the City. The City shall provide written documentation of all such approvals to WDSF prior to WDSF's execution of the Design- Build Agreement. 5. Contemporaneously with execution of the Design-Build Agreement, WDSF and the City intend to enter into a gift agreement pursuant to which WDSF will girl the System to the City (the "Gift Agreement"). Under the Girl Agreement, WDSF will agree to transfer complete ownership of the System to the City at no cost, with an additional amount of funding, in an amount to be determined after execution of the Design-Build Agreement, that shall be used specifically to implement the City's community water fluoridation project with its future water fluoridation system. 6. Under the Gift Agreement, WDSF will retain no rights or interests in the System, nor shall it have any responsibilities, obligations or liabilities with respect to any aspect of the future operation of the System. 7. Under the Gift Agreement, the City will agree to accept the gift of the System and not to take any action that may lead to the rejection of the girl of the System. 8. Under the Gift Agreement, the City will agree that the System will be transferred by WDSF "as is" with no warranty of any kind, whether express or implied, including, without limitation, any implied warranties of memhantability, fitness for a particular purpose or noninfringement. 9. Under the Girl Agreement, the City will agree to indemnify and hold harmless WDSF and its members, trustees, officers, agents, and employees from and against any and all causes of action, suits at law or equity, or claims or demands, and any liability, loss, damage, cost or expense (including without limitation reasonable attorneys' fees) of any nature, arising out of the design, construction, installation, operation, or gift of the System, or the performance of the terms of the Gift Agreement. 10. Under the Gift Agreement, the City will agree that its sole and exclusive remedy from the City's use or inability to use the System or any breach of the Gift Agreement by WDSF shall be for the City to discontinue use of the System or to repair or modify the System at the City's election and sole expense. 11. Under the Gift Agreement, the City will agree that WDSF will not be liable for any special, indirect, incidental or consequential damages in connection with the gift of the System or otherwise arising out of the Gift Agreement, even ifWDSF has been advised of the possibility of such damages. 12. Under the Gift Agreement, the City will agree to designate one or more representatives to work closely with and to assist CH2M Hill with the design, construction, and installation of the System, as necessary, to ensure that the System meets the requirements of the City and all applicable laws concerning the fluoridation of a public water supply. 13. The parties' understanding will be effectuated pursuant to and subject to conditions contained in the Gift Agreement in form and substance satisfactory to the City and WDSF. The Gift Agreement will contain such representations and warranties, covenants and conditions as are customary and appropriate to transactions of this nature. 14. The City and WDSF will coordinate all publicity relating to this MOU, and no party will issue any press release, publicity statement or other public notice relating to this proposal and the matters contemplated herein without prior consent of the other party. 15. Unless otherwise agreed, the City and WDSF will each pay its own expenses in connection with the transactions contemplated hereby. N:\GLENN\Floufidation MOU 5.DOC 2 16. This MOU is solely a statement of present intention of the parties made in good faith and is not intended to create any binding obligations. This MOU is not intended to be, is not represented as, and should not be interpreted as, a legal or binding contract or agreement. This MOU replaces and supersedes all previous correspondence and discussions between the parties concerning this proposal. 17. WDSF and the City will endeavor to complete and execute the Girl Agreement by June 30, 2003. In the event that the parties have not executed the Girl Agreement by September 1,2003, WDSF reserves the right to withdraw this MOU and end negotiations with the City at any time by written notice to the City. DATED this __ day of _, 2003. WASHINGTON DENTAL SERVICE CITY OF PORT ANGELES, FOUNDATION, LLC WASHINGTON Signature Signature By:. By:. Its: Its: CH2M Hill Signature By:. Its: N:\GLENN\Flouridation MOU 5.DOC 3 WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: May 13, 2003 TO: UTILITY ADVISORY COMMITTEE FROM: Stephen Sperr, Engineering Manager RE: Morse Creek Water Line Options Summary: There are sections of the Morse Creek water line that are not an integral part of the City's Water System. As discussed at the January 14, 2003 UAC meeting, the water line is no longer needed as an emergency back-up water supply conveyance. Staff is now considering various options related to the desire or need to continue to provide water to customers outside the Urban Growth Area (UGA) boundary. Recommendation: That the UAC concur with the recommendations outlined in this memo, or as modified by the UAC, and encourage staff to proceed with development of costs and a schedule to implement the recommendation. Background/Analysis: The Morse Creek water line was originally constructed in 1924 and included a dam/intake structure on Morse Creek, a water line from the intake to what is now known as Peabody Heights Reservoir, and related appurtenances. The current concrete coated and lined steel cylinder water line was built in 1961, replacing the earlier wood stave water line. A hydroelectric power generation station using a portion of the water line was built in 1987 and generated power until 1997, when it was shut down due to low energy prices. Steps are being taken this year to re-start the station. Clallam County PUD No.1 started using water from the water line in 1988. There are sections of the Morse Creek water line, as described below, that are not an integral part of the City's Water System. As discussed at the January 14, 2003 UAC meeting, the water line is no longer needed as an emergency back-up water supply conveyance. Staff is now considering various options related to the desire or need to continue to provide water to customers outside the Urban Growth Area (UGA) boundary. The water line outside the City limits has been divided into discrete sections, all of which are outside the UGA boundary except Section 6. Attached is a map showing these sections of the water line. A description of each section, number of customers and discussion of options follows. Morse Creek Water Line Options May 13, 2003 UAC Page 2 of 4 .SECTION 1 A. Description - This section is from the intake at the dam (sta -3+50) to PUD water supply tap (sta) 30+00 and is being used by the Clallam County PUD #1 as a water supply that is treated at their Morse Ct. treatment facility. This section will also supply the City's hydroelectric plant once it is re-started. B. Customers - 2; PUD via Wheeling Agreement and City hydroelectric plant · C. Options 1. Sell to PUD, have PUD wheel water to City's hydro plant. 2. Continue to wheel water to PUD and supply water to hydro plant. 3. Abandon in place. D. Recommendation - Continue to wheel water to PUD and use for hydroelectric plant. SECTION 2 A. Description - This section is fi'om PUD water supply tap (sta 30+00) to the inlet of the penstocks for hydroelectric plant (sta 129+00) and has recently been tested and leaks repaired, and provides service to the City's Morse Creek Hydroelectric Facility. B. Customers - 1; City's hydroelectric plant C. Options 1. Continue to use for hydro plant. 2. Abandon in place. D. Recommendation - Continue to maintain for use as water supply for hydro plant. SECTION 3 A. Description - This section is from the inlet of the penstocks for hydroelectric plant (sta 129+00) to the old chlorination building east of Mt. Pleasant Road (sta 166+50) and is physically disconnected from the water line on the east end and valved offat the west end This section has been de-watered and inactive since 1978. B. Customers - none C. Options 1. Relinquish right-of-way to property owners. 2. Do nothing. 3. Re-establish viability of Morse Creek water line for use as an emergency supply for the City. D. Recommendation - Do nothing. While the water line and right-of-way is of no current use to the City, this may change in the future. SECTION 4 A. Description - This section is from the old chlorination building east of Mt. Pleasant Road (sta 166+50) to where the City supplies wholesale water to the PUD at its Gales Addition Reservoir (sta 238+00). It is supplying customers outside the UGA boundary, with those closest to Mt. Pleasant Road having low water pressure. Most customers along this section of the water line have agreements with the City (as part of easements negotiated when the water line route was originally established) that allow for metered or a low flat Morse Creek Water Line Options May 13, 2003 UAC Page 3 of 4 rate monthly billing that varies among the connections. Some of these customers have a limit on the number of homes per connection, but this has been difficult to enfome in the past. The City has installed meters on all connections to monitor consumption, regardless of whether a flat rate or metered rate is charged. B. Customers - 17 and PUD (wholesale water) C. Options 1. Relinquish fight-of-way by telling customers that after a certain date the City will no longer provide water to individual customers. May give them the option of setting up a water association that can purchase water from the City. 2. Do nothing (continue to provide water to the customers). 3. Sell this section of the water line and its customers to the PUD. 4. Install a booster station to meet minimum Department of Health pressure requirements, using an LID to cost share among those that will benefit. D. Recommendation - Install a booster station, with customers along this section sharing the cost of construction. SECTION 5 A. Description ~ This section is from where the City supplies wholesale water to the PUD at its Gales Addition Reservoir (sta 238+00) to the UGA boundary (sta 265+00). It is supplying customers outside the UGA boundary, but before the PUD connection at the Gales Addition Reservoir. Similar to Section 4 above, most customers along this section of the water line have agreements with the City that allow for metered or a low flat rate monthly billing that varies among the connections. The City has installed meters on all connections to monitor consumption, regardless of whether a flat rate or metered rate is charged. B. Customers - 9 C. Options 1. Relinquish right-of-way by telling customers that after a certain date the City will no longer provide water to individual customers. May give them the option of setting up a water association that can purchase water from the City. 2. Do nothing. 3. Sell this section of the waterline, along with Section 4, to the PUD, installing a water meter at the UGA boundary. D. Recommendation - Do nothing, but require the PUD to pay for some of the maintenance costs associated with this section of the water line. SECTION 6 A. Description - This section is from the UGA boundary (sta 265+00) to the City limits (sta 272+00). This section is a small area outside the City limits but within the UGA. B. Customers - 2 C. Options 1. Do nothing. 2. Sell to the PUD. D. Recommendation - Do nothing. Morse Creek Water Line Options May 13, 2003 UAC Page 4 of 4 While it is recommended that the City continue to provide water to customers outside the UGA that are along the Morse Creek water line, there are costs associated with doing so. City staff is requesting that the UAC either concur with the above recommendations or give guidance on how to proceed in addressing each of the water line sections described. Staffcan then develop costs and a schedule for implementation that can be brought to a future UAC meeting for approval. 0.5 Miles Map legend - Morse creek water line Diversion structure -~ Powerhouse · ~ City water structure =~ PUD water structure ~ Morse creek water line ._ _ , Treatment Plant ...... Morse creek City boundary = '" UGA boundary