Loading...
HomeMy WebLinkAboutAgenda Packet 06/08/2010Utility Advisory Committee Jack Pittis Conference Room Port Angeles, WA 98362 June 8, 2010 AGENDA I. Call To Order II. Roll Call III. Approval Of Minutes For May 11, 2010 IV. Late Items V. Discussion Items: D. Advanced Metering Infrastructure System Request For Proposals Update VI. Next Meeting Date July 13, 2010 VII. Adjournment N. \uac \final \060810 A. Stormwater Rate Reduction Incentives B. Wireless Mobile Data System Grant Application Update C. Energy Efficiency and Conservation Block Grant Capital Agreement PRINT NAME 07 N t RAE N∎ X o w� N: PWKS LIGHT\ CONS CATE SI GNUP wpd UTILITY ADVISORY COMMITTEE GUEST SIGN UP SHEET ORGANIZATION Councilmembers Absent: Dan Di Guilio Utility Advisory Committee Members Present: Staff Present: III. Approval Of Minutes Information only. No action taken. Utility Advisory Committee Jack Pittis Conference Room Port Angeles, WA 98362 May 11, 2010 3:00 p.m. L Call To Order Vice Chairman Dean Reed called the meeting to order at 3:00 p.m. II. Roll Call Councilmembers Present: Brooke Nelson, Cherie Kidd, Max Mania Paul Elliott, Dean Reed Bill Bloor (Arrived at 3:18 p.m.), Mike Puntenney, Larry Dunbar, Dan McKeen, Phil Lusk, Jim Klarr, Rick Hostetler, Terry Gallagher, Brian Smith, Terry Dahlquist, Bob Kajfasz, Cate Rinehart Vice Chairman Reed asked if there were any corrections to the minutes of April 13, 2010. Councilmember Mania moved to approve the minutes. Paul Elliott seconded the motion, which carried unanimously. Vice Chairman Reed abstained due to absence at the meeting. IV. Late Items None V. Discussion Items A. Wireless Mobile Data System Grant Application Brian Smith, Deputy Police Chief, reviewed the information contained in the packet, responded to questions, and provided clarification. There was a brief discussion. The Utility Advisory Committee directed staff to provide additional information about estimated operating and maintenance costs at a future meeting. B. Solid Waste Management And Recycling Laws Information only. No action taken. C. Electric Utility Safety Equipment Purchase Terry Dahlquist, Electrical Engineering Manager, explained that each substation has several high voltage breakers that periodically need to be maintained exposing personnel to a potential arc flash if some mechanical failure occurs during the process. There was a brief discussion. Councilmember Mania moved to recommend City Council purchase a remotely operated breaker racking system to protect personnel during substation maintenance. Paul Elliott seconded the motion, which carried unanimously. D. Conservation Program Annual Report Bob Kajfasz, Commercial Energy Analyst, presented last year's achievements, summarized the currently available rebates, and shared progress being made on the options to use available program funding. A discussion followed. Information only. No action taken. E. Conservation Loan Guarantee Agreement Phil Lusk, Power Resources Manager, advised that First Federal had provided a notice of termination of the old agreement and provided a new one for consideration. There was a brief discussion. Councilmember Nelson moved to recommend City Council authorize the Mayor to sign the Conservation Loan Guarantee Agreement with First Federal Savings and Loan including soliciting other lenders and make minor modifications to the agreement. Councilmember Kidd seconded the motion, which carried unanimously. VL Information Only Items: F. Advanced Metering Infrastructure System Project Update Larry Dunbar, Deputy Director of Power Systems, gave a power point presentation noting system benefits and components. There was a brief discussion. Information only. No action taken. G. Federal Communications Commission National Broadband Plan Larry Dunbar, Deputy Director of Power Systems, summarized the plan and showed a short video. There was a brief discussion. Information only. No action taken. H. Morse Creek License Amendment Update Information only. No discussion or action taken. L Benefit Dump Day Information only. No discussion or action taken. VII. Next Meeting Date: June 8, 2010 VIII. Adjournment: 4:27 p.m. Dean Reed, Vice Chairman Cate Rinehart, Adminstrative Specialist II 1 J W A S H I N G T O N U.S.A. Utility Advisory Committee Memo Date: June 8, 2010 To: Utility Advisory Committee From: Terri Partch, P.E., Stormwater Program Manager Subject: Stormwater Rate Reduction Incentives Summary: Staff will provide a brief presentation summarizing the requirements for a 25% stormwater rate reduction, and examples of how these requirements can be met. Recommendation: For information only, no action requested. Background /Analysis: In June of 2009, the City Council passed a stormwater ordinance which included many new requirements for both the City and City residents to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) Stormwater Permit. Within that ordinance was a provision which allows for a 25% stormwater rate reduction for sites that are less than 1 acre and able to meet two of the following rainwater dispersion methods: 1. Installation of Roof Downspout Controls. Examples of this include: Downspout infiltration systems deep trenches or drywells Downspout dispersion trenches 10 feet in length for every 700 square foot (sf) of roof area Perforated stub out connections 10' of pipe per 5,000 sf of roof area 2. Installation of Best Management Practices (BMPs) or Low Impact Development Techniques (LID) to mitigate for impervious area equal to at least 10% of the site or lot. Examples of this include: Concentrated and sheet flow dispersion on driveways Preservation of natural vegetation Placement of LID facilities (raingardens, permeable pavements, roof rainwater collection systems) 3. Amendment of all disturbed soils on the lot 8 inches of topsoil (meeting the specifications of the DOE manual) over 4 inches of scarified material. Residents or properties which are able to meet the requirements for the above rainwater dispersion methods will be allowed a 25% reduction of their stormwater fee over the year. The current annual stormwater fee for a residence is $72.00 ($6 /month). The 25% discount would amount to an $18.00 savings per year. Staff will present this same information to the City Council on June 15, 2010. N \UAC \Final \Stormwater Rate Reduction Incentwes.doc Overview Roof Drain Disconnection Stormwater Incenndves Terri Partch, P.E. Civil Engineer Stormwater Manager The stormwater ordinance effective in August of 2009 allows for a 25% fee reduction for small sites. ($18 for a single family residence) Two rainwater dispersion or infiltration techniques must be constructed to receive the discount The following slides detail the dispersion and infiltration techniques 1 Howe Home apdurn ml. PLANYIEW rVeer' raml. ...h aw —POY DOmrpat i Rod tbw Dorrapott Figure 3.2 Typical Ownapote Inetlration Trench law Cann DRY WELL SECTION NTS Figura 2 4 Typical Downepout Infiltration Drywall Downspout Infiltration Trench Length of trench based on soil type Shouldn't be built on slopes steeper than 25% May be located under pavement Infiltration Drywell Bottom must be 1' above the high groundwater level Each well may serve up to 1000 square feet of roof area 2 emh BERM DETAIL doh 2191men ROW L ag Awl ocra p e. malbbsnasls If PLAN Steep Drt. 4th Slotted DrAne Figure 6.4 Typical Ca Flow Dlepanlan for Steep Driveway. Concentrated or Sheet Flow Dispersion for Driveways 25' minimum vegetated flow path up to 700 square feet of impervious area per trench Preserve Natural Vegetation Preserve the natural vegetation on at least 10% of the lot 3 Rain Gardens Equal to 10% of the lot filter stnp water flow l /p er" i imper Ij"�d�'us surface detention Fr_ filtration zone retention zone(_Anaerub Aerobic zone) Aggregate filter blanket Pervious Pavements Equal to 10% of the lot planting soil mix a'a pea gravel layer filter fabric (optional) under -drain discharge pipe �Yd selected native plants and hardy culdvars 4 Soil Amendment Ideally the duff layer and native top soil are scraped off and retained Native topsoil can be replaced with 8" of topsoil. Topsoil should have an organic content of 10% dry weight in planting beds Topsoil should have an organic content of 5% dry weight in turf areas pH should range between 6.0 to 8.0, or match the native soil pH. Native earth under the topsoil layer must be scarified to a depth of 4" Promotion of Rate Reduction Incentives Clallam County Fair Utility Bill Insert Future Workshop 5 PORT NGELES W A S H I N G T O N U.S.A. Utility Advisory Committee Memo June 8, 2010 Date: To: Utility Advisory Committee From: Larry Dunbar, Deputy Director of Power Systems Subject: Wireless Mobile Data System Grant Application Update Summary: At the direction of the Utility Advisory Committee staff will present a summary of the estimated operating and maintenance costs of the proposed wireless mobile data system at today's meeting. Recommendation: For information only, no action requested. Background /Analysis: On May 11, 2010, staff provided the Utility Advisory Committee information on the City's proposed wireless mobile data system that is a sub -grant to the Northwest Open Access Network's (NoaNet) grant application under the Broadband Technology Opportunities Program (BTOP. The Utility Advisory Committee directed staff to provide additional information about the estimated operating and maintenance costs of the proposed wireless mobile data system at a future meeting. Staff will present a summary of the estimated operating and maintenance costs of the proposed wireless mobile data system at today's meeting. N' \UAC\Final \Wireless Mobile Data System Grant Application Update doe Utility Advisory Committee Wireless Mobile Data System Business Case Evaluation Summary June 8, 2010 Agenda 1 Brief Background 2 Anticipated Mobile Units 3 Capital Costs 4 0 M Expenses 5 Revenue Requirements 6 Conclusions Brief Background Capital Facilities Plan Columbia Telecommunications Corporation Wireless Public Safety Network City sub -grant to NoaNet BTOP grant Due diligence activities underway Brief Background Continued Utility Advisory Committee requested financial summary Key Business Case Evaluation Assumptions: First full year of operation illustrated City ownership, operation, maintenance City -wide coverage CTC design complete MAN Services Agreement connections Depreciation not included f Legend 0 Future Fiber Optic Sites to be Activated Existing Fiber Optic Sites Anticipated Mobile Units Subscriber Categories Mobile Units City Police Fire Departments 67 Fire District No. 2 7 Fire District No. 3 15 City CED Department 1 City Finance Department 1 City PW &U Department 30 Residential (10% market penetration) 800 Total 921 Capital Costs Description Estimate BTOP Grant (70 $2,606,916 City Match (30 1,117,249 Total $3,724,165 Use of BTOP funds is anticipated to be adequate for all equipment and installation costs for public safety City match includes salaries and future MAN Services Agreement upgrades 0 M Expenses Description Estimate Utilities (Electric) 1 $18,000 Contingency 1 5,000 Network Maintenance 1 28,000 Fiber Optic Service 1 15,840 Pole Attachment Fees 3,312 Billing Support 2,400 Bad Debt 1,000 Business Manager (0.05 FTE) 1 $8,000 Service Technicians (1.50 FTE) 88,000 Total Annual 0 M Expenses Total If Public /Private Partnership $169,552 $70,152 r Revenue Requirements Description Estimate City Police Fire Departments 40,000 Fire District No. 2 4,200 Fire District No. 3 9,000 City CED Department $600 City Finance Department 600 City PW &U Department 18,000 Residential 96,000 Total Annual Revenue Requirements $169,400 $50 /Mobile Unit/Month With Residential Revenues $115 /Mobile Unit/Month Without Residential Revenues Conclusions CTC and staff are continuing to support NoaNet during BTOP grant due diligence process Without the BTOP grant City public safety needs will continue to be unmet With the BTOP grant exploring a public /private partnership will be the key to cost, benefit, and risk sharing PORTANGELES W A S H I N G T O N U.S.A. Utility Advisory Committee Memo Date: June 8, 2010 To: Utility Advisory Committee From: Phil Lusk, Power Resources Manager Subject: Energy Efficiency and Conservation Block Grant Capital Agreement Summary: A capital agreement was received from the Washington State Department of Commerce that requires the Mayor's signature to obtain a $135,000 grant award. Recommendation: Forward a favorable recommendation to City Council to authorize the Mayor to sign Capital Agreement Contract Number F10 -52110 -044 with the Washington State Department of Commerce for a $135,000 grant for the City Hall Annex Energy Conservation Improvements project. Background /Analysis: On July 21, 2009, City Council authorized the Public Works and Utilities Director to submit grant applications for funds made available by the American Recovery and Reinvestment Act (ARRA) of 2009, Public Law 111 -5. An application was submitted in September 2009 for funding under the Energy Efficiency and Conservation Block Grant (EECBG) Program. The scope of work includes installing the following measures: 1) cooling/economizer repairs for the City Hall main floor offices; 2) heating, ventilation and air conditioning (HVAC) improvements for the 2 Floor Legal Department area, and; 3) installing a Direct Digital Controls system that will be used for enhanced time -of -day scheduling and optimizing the use of outside air for natural cooling. The Washington State Depai tinent of Commerce sent an award notice in November 2009 that a $135,000 grant will be provided to the City for its proposed City Hall Annex Energy Conservation Improvements project. On December 15, 2009, City Council authorized the Mayor to accept the grant award. However, a capital agreement was recently provided for signature. The capital agreement is currently under review by the City Attorney. Staff requests that the Utility Advisory Committee forward a favorable recommendation to City Council to authorize the Mayor to sign Capital Agreement Contract Number F10 -52110 -044 with the Washington State Department of Commerce for a $135,000 grant for the City Hall Annex Energy Conservation Improvements project. N: \UAC\Final\EECBG Contact.doc PART NGELES W A S H I N G T O N U.S.A. Utility Advisory Committee Memo June 8, 2010 Date: To: Utility Advisory Committee From: Larry Dunbar, Deputy Director of Power Systems Subject: Advanced Metering Infrastructure System Project Update Summary: Several activities are underway in support of the Advanced Metering Infrastructure System project. Due to the scope of the project it is anticipated to be an agenda item for the Utility Advisory Committee in August through October of this year. Recommendation: For information only, no action requested. Background /Analysis: A grant application was submitted to the Bonneville Power Administration (BPA) on April 19, 2010 for a Demand Response (DR) project that would be integrated into the AMI System. A consulting agreement for the Retail Tiered Rate Methodology (TRM) Study was approved by City Council on April 20, 2010. The AMI System Request for Proposals (RFP) was issued on May 10, 2010. The Communications Plan RFP was also issued on May 10, 2010. On May 21, 2010, the City held a pre proposal conference for the AMI System RFP, a total of 17 vendors registered and attended the conference either in- person or via conference call. All registered vendors have signed the City's non disclosure agreement to gain access to confidential information about the City's computer and telecommunications networks. The first addendum was issued which was a response to several questions about the RFP. Additional questions have been asked by vendors that will be answered by the City the second addendum in the near future. Technical and Charge Proposals are due August 6, 2010. A total of 3 consultants registered with the City for the Communications Plan RFP. Consultant qualifications are due July 2, 2010. The City's grant application for a DR project is under final consideration by BPA at this time. If successful, a cooperative agreement will be brought to the Utility Advisory Committee for consideration at the July 2010 meeting. EES Consulting will be providing a presentation on the Retail TRM Study to the Utility Advisory Committee at the August 2010 meeting. Additional information about the AMI System RFP is available on the City's File Transfer Protocol website at http /olypen.com/copa under the "AMI System RFP" folder. An executive summary of the Utility Advisory Committee involvement for the overall project is attached. N \UAC \Flnal\AMI System Project RFP Update doe Utility Advisory Committee Involvement in the Advanced Metering Infrastructure System Project Request for Proposals Milestones Advertisement Proposal Deadline UAC Consideration City Council Consideration Scope of Work Milestones UAC Consideration City Council Consideration UAC Consideration City Council Consideration AMI System 5/10/2010 8/6/2010 9/14/2010 9/21/2010 AMI System Phase I Construction 3/8/2011 Phase II Construction 12/11/2011 9/18/2011 Executive Summary 3/15/2011 BPA DR Proj ect 2/18/2010 4/19/2010 7/13/2010' 7/20/2010 BPA DR Proj ect Phase II Construction TBD TBD Communications Plan 5/10/2010 7/2/2010 8/10/2010 8/17/2010 Communications Plan Consultant Report 10/12/2010 10/19/2010 'Dates are uncertain; the DR project is under final consideration by BPA at this time. Retail TRM Study 1/25/2010 3/5/2010 4/13/2010 4/20/2010 Retail TRM Study Consultant Report 8/10/2010 9/7/2010