HomeMy WebLinkAboutAgenda Packet 09/11/2000 UTILITY ADVISORY COMMITTEE PUBLIC WORKS CONFERENCE ROOM PORT ANGELES, WA ~83(~2 SEPTEMBER I I, 2000 3:00 P.M. AGENDA I. CALL TO ORDER II. ROLL CALL I{L APPROVAL Of MINUTES Of AUGUST 7, 2000 REGULAR MEETING. IV. DISCUSSION ~tEMS A. BIOSOLID LAND APPLICATION (UEFF - 5 MINUTES - VERbal) B. TREE TRIMMING (Jim h - I 0 MINUTES) C. EDIZ HOOK CONVERSION (JIM H - I 0 MINUTES) D SOUTHWOODS CUSTOMER CONVERSION ASSISTANCE (~JIM h - I 0 MINUTES) E. AERIAL PHOTO CONTRACT (GARY - ~ 0 MINUTES) F. UPDATE ON GWi COMPLIANCE AGREeMeNT (GLENN - I 0 MINUTES - veRBAL) V. INFORMATION ONlY ITEMS VI. LATE ITEMS Vii. NEXT ME.rING - OCTOBER 9, 2000 VIII. ADUOURNmENT UTILITY ADVISORY COMMITTEE Port Angeles, Washington August 7, 2000 L Call to Order: Chairman Campbell called the meeting to order at 3:00 p.m. II. Roi1 Call: Members Present: Chairman Campbell, Dean Reed, Allen Bentley, Councilman Williams Members Absent: Mayor Larry Doyle Staff Present: Michael Quinn, Craig Knutson, Glenn Cutler, Ken Ridout, Scott McLain, Gary Kenworthy, Doyle McGinley, Dale Miller, Steve Sperr, Cate Rinehart Others Present: None III. Approval of Minutes: Chairman Campbell asked if there were any changes or additions to the agenda. None were given. Reference was made to the question of who was elected Vice Chairman. Research indicated Councilman Williams was chosen at the January 12, 2000 meeting. Chairman Campbell then asked if there were any additions or corrections to the meeting minutes of July 10, 2000. Dean Reed moved to approve the minutes. Councilman Williams seconded the motion, which carried unanimously. IV. Discussion Items: A. CH2M Hill Contract A brief introduction was given by Glenn Cutler, Director of Public Works and Utilities. Steve Sperr, Utility Engineer, gave a brief overview of the various water issues. There was some concern over funding of the projects and time frames. Mr. Cutler assisted in explaining the funding sources for the different undertakings. A discussion followed with concerns expressed regarding releasing information to the public. The Public Works utility staff will develop a series of articles to be placed with the media to explain the GWI situation and the possible impacts. Dean Reed moved to recommend the City Council enter into an Agreement for Professional Services with CIt2M Hill, Inc., and authorize the Mayor to sign the Agreement. Allen Bentley seconded the motion, which carried unanimously. B. Hazardous Waste Collection Day Agreement Dale Miller, Recycling Coordinator, explained that for the past 7 years the City has participated in the 1 UTILITY ADVISORY COMMITTEE August 7, 2000 annual Household Hazardous Waste Amnesty Days sponsored by Clallam County and the Department of Ecology. Cost to the City depends upon participation - historically 40%. The City paid $6,347 last year and received credit for $1,153 for in-kind services. A discussion followed regarding the types of waste collected and what the benefits are to the City. Allen Bentley moved to recommend the City Council authorize the Mayor to execute the agreement with Clallam County to provide a maximum of $7,500 toward the cost of the Household Hazardous Waste Amnesty Days Event. Councilman Williams seconded the motion, which carried unanimously. C. Water Fluoridation A brief background was given by Glenn Cutler, Director of Public Works and Utilities. Doyle McGinley, Water, Wastewater Collection Superintendent, explained that a fluoridation steering committee had been formed by the late Dr. Larry Schueler. Mr. McGinley gave a brief overview of a meeting he recently attended indicating that at some point in the future this committee will probably approach the City Council requesting the City provide fluoridation. It was the consensus of the group that the final outcome of this issue be determined by the people of Port Angeles and not Council alone. A brief discussion followed. D. Status of Power Subscription with BPA Scott McLain, Deputy Director of Power Systems, reviewed the subscription contracts and reported that the contract offerings from Bonneville are currently on hold. Mr. McLain further explained the options that may be available and the consequence of those options. A discussion followed regarding the various factors that are involved. Mr. McLain recommended a work session on September 5, 2000 to explain the various items in the contract to Council, with final authorization of the contract at the September 19th meeting.. V. Information Only Items: Water Marketing Seminar Glenn Cutler, Director of Public Works and Utilities, reminded the committee of the American Water Resources Association, Washington Section 2000 Annual Conference which will be held November 15, 2000. Mr. Cutler indicated that he would be attending along with Craig Knutson and Tim Smith. Cost for attendance is $100 per person and there will be an additional available spot. Mr. Cutler stated he would remind members of Council the early part of October. VI. Late Items: None VII. Next Meeting: The next meeting will be held September 11, 2000, at 3:00 p.m. in the Public Works Conference Room. VIII. Adjournment: 2 UTILITY ADVISORY COMMITTEE August 7, 2000 Councilman Williams moved to adjoum the meeting. Allen Bentley seconded the motion, which carried unanimously. The meeting adjourned at 4:07 p.m. Orville Campbell, Chairman Cate Rinehart, Administrative Assistant A:\aug7min.wpd 3 WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: September 11,2000 To-' UTILITY ADVISORY COMMITTEE FROM: JAMES L. HARPER, ELECTRICAL ENGINEER SUBJECT: RELEASE OF PHASE 1 RETAINAGE AND CHANGE ORDER FOR PHASE II OF THE TREE TRIM CONTRACT [PROJECT 20-11] ',ummarv: Asplundh Tree Expert Co. has completed Phase 1 of the trimming of power line right )fway per the contract. The work has been inspected and accepted and Asplundh Tree Expert Co. has been paid in the amount of $24,187.00. A second trimming is needed prior to winter storms at an approximate cost of $25,000. Recommendation: UAC recommend Council accept Phase 1 of the project, authorize the release of Asplundh Tree Expert Co. retainage in the amount of $1,273.00 and authorize the Change Order to Contract 20-11 in the amount of $25,000 for additional tree trimming. Background ! Analysis: Asplundh Tree Expert Co. has completed the spring trimming of trees along power lines throughout the City. The trimming was necessary to keep trees a safe distance from power lines to minimize tree caused outages that normally occur during storms. The contract was awarded on an hourly basis at prevailing state wage rates in an amount not to exceed $30,000.00 with an option for an additional trimming at the end of the growing period. The spring tree trimming, done during April and May, has been completed and approved. Clearance has been received from the Department of Labor and Industries. The final cost of Phase 1 of the Contract is $25,460.00. The power system was inspected in August and it is recommended that trees in proximity to power lines be trimmed again this fall at a cost of approximately $25,000. The trees currently needing trimming are city wide and in some cases are fast growing species trimmed last spring. The winter storm season can then be approached with the power lines clean to minimize tree caused outages. In subsequent years it is planned to trim each year in the fall after growth stops. This additional trimming was budgeted for 2000. WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: September 11, 2000 To: UTILITY ADVISORY COMMITTEE FROM: JAMES L. HARPER, ELECTRICAL ENGINEER SUBJECT: EDIZ HOOK UNDERGROUND CONVERSION :The to underground the overhead facilities on Ediz Hook is currently budgeted project 000 in 2000. It will result in a significant saving if the approved CFP expenditures for this $100,000 in 2000 and $50,000 in 2001 are included in the same contract and done at one ffis proceeding with one project in the amount of $150,000 as budgeted. Background / Analysis: This project which is estimated to cost approximately $400,000 was proposed to be spread over several years. The 2000 budget includes $150,000 and is in conflict with the CFP which includes $100,000 in year 2000 and $50,000 each year for years 2001 thru 2006. The construction of this project in pieces adds multiple bidding costs, approximately $1,000, multiple mobilization costs, approximately $2,000 and multiple system tap costs, approximately $3,000, to the project cost for each piece which is done. Therefore, by combining two years project imo one contract will increase the amount of conversion we get for the money in 2001 by approximately 12%. Staff anticipates the next phase of this project to be constructed in the winter of 2002-2003 in the amount of $100,000 including the CFP projections for both years. The project includes, in addition to placing the primary electric system underground, conduit for future lighting of the trail, conduit for talco lines to go underground and possibly conduit for City fiber optic cable is being considered. The current overhead telco line is fiber optic to the Coast Guard. Due to the nature of fiber optic cables and the degrading effects of splices, this line will not be relocated to underground until the entire conduit system is installed. Therefore, the poles cannot be removed until the project is completed in about 2006. If additional funds are allocated the date for completion can be expedited and the multiple project costs can be reduced. WAShINGtON, U.s.a. UTILITY ADVISORY COMMITT££ MEMO DATE: September 11, 2000 TO: UTILITY ADVISORY COMMITTEE FROM: JAMES L. HARPER, ELECTRICAL ENGlNEER SUBJECT: SOUTHWOOD SERVICE CONVERSION COST ASSISTANCE :ummary:. The City Council approved assisting customers in the conversion of overhead ;ervices to underground, in areas of landlocked facilities in Cresthaven at the rate of 100% of the first $1,000 plus 90% of cost over $1,000. This was not considered to be precedent setting. The next landlocked facilities project scheduled for 2001 is the Southwood area with 34 customers. Recommendation: UAC recommend the City Council authorize reimbursement of customer conversion costs at 90% of the lowest estimated cost. Background / Analysis: The City Council on September 7, 1999 approved a plan by which all rear lot landlocked facilities would be replaced with underground facilities in street right of way. Included was up to $1,000 financial assistance to the customers with overhead services who must convert to underground. The City Council on July 18, 2000 increased the assistance for customers in Cresthaven to 100% of the first $1,000 plus 90% of cost over $1,000. This increase was approved because the cost for conversion was higher than anticipated and averaged approximately $2,000. The remaining landlocked areas include 82 overhead customers which should also be assisted. The Southwood area contains 34 of the 82 remaining customers. Funds for conversion of this area were included in the 2000 budget but construction is currently scheduled for 2001. The current design will require only 30 of the Southwood 34 overhead service customers to convert. The increase of assistance at the 90% rate was decided by Council to provide cost share assistance to the customers on the conversion and give incentive to customers to obtain the lowest possible price. This appears to be a very equitable assistance and the staff is recommending that future landlocked facility customer conversions be assisted at 90% of the lesser of invoiced cost or estimated cost. It is anticipated that the conversion costs for Southwood will average approximately $2,000 per service, for a total cost of assistance of approximately $54,000. If adopted each resident will be expected to contribute approximately $200. WASHINGTON U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: September 11, 2000 To: UTILITY ADV/$ORY COIVIMITTEE FROM: Gary Kenworthy, P.E., Deputy Director of Engineering and City Engineer SUBJECT: Aerial Mapping 2000, Project 20-23 l~atmm, a!:~. The City's current aerial and digital mapping was performed in 1995 by David Smith and Associates. The mapping needs to be updated to reflect development over the past 5 years and be expanded to include all of the Urban Growth Area (UGA). David Smith and Associates was selected as the most qualified to provide the aerial mapping services. This selection was based on their past performance, use of local surveying professionals, and familiarity with the previous mapping project. Following selection Public Works Engineering requested and negotiated a proposal from David Smith and Associates to update the mapping and include additional areas east and west of the City. This project was budgeted for 2000 execution. ~ Recommend to the City Council that the Mayor be authorized to sign an agreement with David Smith & Associates in the amount of $108,596.00 to provide Aerial Mapping 2000 services. Background /Analysis: The City's current aerial and digital mapping was performed in 1995 and needs to be updated to reflect development and include all of the Urban Growth Area (UGA). The aerial mapping project will include ground control survey, aerial photography, additions to and updating existing contour and planimetric (above ground structures and utilities) mapping, digital orthophotography and 3 color mosaics. In the 2000 budget City Council approved $125,000 from the Light budget and $25,000 from Solid Waste budget for the updating of aerial photography. The 1995 aerial and digital mapping was done by David Smith & Associates, Inc. from Portland, OR with Bob Winter (Now Jim Wengler) Surveying from Sequim, WA. providing the ground control survey. These two firms are familiar with our overall aerial mapping, have the existing electronic data and the background information to update our aerial mapping. The Public Works Department, therefore, contacted the David Smith & Associates to provide a cost estimate to update our 107 existing sheets of aerial mapping and add an additional 31 new sheets of aerial mapping. The current mapping includes all of the City Limits and some of the UGA areas. The new mapping would include all of the UGA areas, plus the Elwha area and the Morse Creek areas to cover the City's water system. Attached is the negotiated proposal from David Smith & Associates to complete the entire project as per attached. The overall project cost, as negotiated, is $108,596.00. August 31,2000 Mr. James M. Mahlum City of Port Angeles Department of Public Works 321 East Fifth Street Port Angeles, WA 98362 Fax Number: (360) 417-4542 SUBJECT: DIGITAL MAPP/NG / ORTHOPHOTOGRAPHY BUDGET ESTIMATE Dear Jim: Following is our cost estimate *to provide lhe new mapping and digital orthophotography you have requested. APPROACH: Our approach would be Io obtain stereo coverage aerial photography at 1 "=500' photo scale to cover the previous mapping area and new expanded map area boundary. We would control and aero-triangulate the full flight. New topographic mapping consistenI with the standards and specifications for our previous project will be completed for the new map sheets. Updates to existing AutoCAD files are not proposed. 0.5' pixel digital onhophotos will be produced for all existing and new map sheets. The orthophotography will be prepared as a seamless overall coverage, with individual map sheet tiles cut for delivery. For the existing map sheets, we will use the existing contours to create a Digital Elevation Model which will be used to rectify the digital orthophotography. We have included some money to update the DEM in the event that a major change in the topography causes significant distortion or very noticeable displacement in the final image, particularly at the join between adjacent orthophotos. We have nol included costs to update all of the contour data. Consequently, in areas where the topography has changed, there may be some displacement on the final onhophotos. As a general rule, if the topography has not changed more than 5' in elevation, the resulting displacement on the orthophotos will not be noticeable within map accuracy standards. For the new map sheets, the new elevation data will be used and this will not be an issue. ·, Ltr: Jim Mahlum Digital Orthophotography/New Map Sheets Budget Estimate Page 2, August 31,2000 COSTS: 1. Ground control and premarking (see James Wengler's estimate, attached) Traverse/target 19 points off of existing control $ 11,200.00 Establish and monument 11 new GPS points ...... $ 10,970.00 Premark 80 existing points ........... $ 9,600.00 2 Color aerial photography and one set of 9"x9" color contact prints ........... $ 7,478.00 3 Aerotriangulation to extend the ground control $ 14,121.00 4 New planimetric data and contour mapping for 31 new map sheets ......... $ 31,862.00 5 Contingency to update existing contours in instances where topographic change causes unacceptable distortion on the orthophotos $ 5,460.00 6. Color, 0.5' pixel digital orthophotography for map sheets (no hard copies) ........ $ 20,767.00 7. Overall digital color mosaic and three (3) hard copies (not mounted) ........... $ 2,725.00 8. TOTAL . $114,183.00 9. Cost savings if black and white photography is used for the mapping and digital orthophotos (This affects only the mapping and orthophotos; item 7, overall mosaic, would still be color) .... ($ 5.587.00) REVISED TOTAL . $ 108,596.00 Please let me know if you have any questions or if you wish to consider any other options. We very much appreciate this opportunity to continue working with you and the City of Port Angeles. Sincerely, DAVID C. SMITH & ASSOCIATES, INC. Scott D. Smith, C.P. Vice President W A S H J N G T O N, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: September 11, 2000 TO: UTILITY ADVISORY COMMITTEE FROM; JAMES L. HARPER, ELECTRICAL ENGINEER SUBJECT: CHANGE ORDER FOR PHASE II OF THE TREE TRIM CONTRACT [PROJECT 20-11 ] Summary_: Asplundh Tree Expert Co. has completed Phase 1 of the trimming of power line right of way per the contract. The work has been inspected and accepted and Asplundh Tree Expert Co. has been paid in the amount of$24,187.00. A second trimming is needed prior to winter storms at an approximate cost of $25,000. Recommendation: UAC recommend Council authorize the Mayor to sign the Change Order ito Contract 20-11 in the amount of $25,000 for additional tree trimming. Background / Analysis: Asplundh Tree Expert Co. has completed the spring trimming of trees along power lines throughout the City. The trimming was necessary to keep trees a safe distance from power lines to minimize tree caused outages that normally occur during storms. The contract was awarded on an hourly basis at prevailing state wage rates in an amount not to exceed $30,000.00 with an option for an additional trimming at the end of the growing period. The spring tree trimming, done during April and May, has been completed and approved. Clearance has been received from the Department of Labor and Indus~ies. The final cost of Phase I of the Contract is $25,460.00. The power system was inspected in August and it is recommended that trees in proximity to power lines be trimmed again this fall at a cost of approximately $25,000. The trees currently needing trimming are city wide and in some cases are fast growing species trimmed last spring. The winter storm season can then be approached with the power lines clean to minimize tree caused outages. In subsequent years it is planned to trim each year in the fall after growth stops. This additional trimming was budgeted for 2000. 1 0 1 ~' ........ ~'~ 2000 MAPPING ~ grid ~ ~ Existing map New map grid ~ '~