Loading...
HomeMy WebLinkAboutAgenda Packet 10/17/2000 UTILITY' ADVISORY COMMI'~-I'EE - SPECIAL MEETING 2,"° FLOOR CONFERENCE ROOM PORt ANGELES, WA 983(~2 OCTOBER I 7, 2000 5:00 P.M. AGENDA [. CALL TO ORDER Ii. ROLL CALL MINUTES OF OCTOBER 9, :~000 REGULAR MEETING WILL BE PRESENTED FOR APPROVAL AT NoveMBer I 3th ME.rING. IV. DISCUSSION ITEMS A. ENGINEERING AGREEMENT With PARAMETRIX FOR L~NDFILL CONSULTING SERVICES (GARY) B. ENGINEERING AGREEMENT WITH BROWN AND CALDWELL FOR WASTEWATER/STOR~IWATER CONSULTING SERVICES (GARY) C. CHANGE ORDER, DOWNTOWN WATERMAIN/SIDEWALK PHASE II, PROUECT 99- I I (GARY) V. LATE ITEMS VI.NEXT MELTING - NOVEMBER ~ 3, 2000 "' DIINNER WILL BE SERVED A:~A, GEN DA.wPD REV ~ pORTANGELES WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: October 17, 2000 TO: UTILITY ADVISORY COMMITTEE FROM: Glenn A. Cutler, Director of Public Works and Utilities :-NY'~ ' SUBJECT: Agreement with Parametrix, Inc. for Landfill Consulting Services. Summary: The City's current agreement with Parametrix, Inc. is nearing completion and a new agreement for the period of October, 2000 to March 31, 2002 is needed. Proposals were requested from those engineering finns on the City's consultant roster which indicated landfill/solid waste expertise. Interviews were held with the responding firms and Parametrix was selected to continue with their engineering services. Recommendation: Forward to Council with a recommendation supporting approval of the agreement with Parametrix, Inc. to provide landfill/solid waste related engineering support services in the amount not to exceed $295,284. The City Attorney shall review and approve the agreement prior to signing. Background / Analysis: The City's current engineering services agreement with Parametrix, Inc. is nearing completion and a new agreement is needed to provide assistance for upcoming landfill and solid waste related needs. In view of the various new planning issues, closure analysis, co-composting and related tasks we requested proposals from those engineering finns on the City's consultant roster which indicated landfill/solid waste expertise. Interviews were held with the responding firms and Parametrix was selected to continue with their engineering services. The engineering services and costs proposed in the new agreement include the following: Task 1: General Operations Assistance $ 85,798 Task 2: Regulatory Coordination $ 30,831 Task 3: Revise Development and Closure Plan $ 38,929 Task 4: Co-Composting Design Report $ 49,726 Task 5: Long Range Planning Report $ 50,000 Task 6: Directed Services $ 40,000 The proposed not to exceed amount of the agreement $295,284 Task 1, General Operations Assistance, includes site life verification, site mapping, maintenance programs for leachate, stormwater, gas, and groundwater monitoring systems, site small project design, and staff meetings/support. City Council Memo Re: Parametrix Agreement Page 2 Task 2, Regulatory Coordination, includes providing assistance in permitting activities for 2000/2001, regulatory inspection responses and changes in requirements, preparation of Annual Reports, coordination with regulatory agencies and community organizations, reviewing and support as needed for groundwater monitoring and reporting. In the existing contract groundwater related activities were performed entirely by Parametrix, Inc. This year we provided training for our Wastewater Superintendent, Jeff Young, to allow most of the activities to be performed by the City at an estimated savings of $25,000 to this agreement. Task 3, Revise Development and Closure Plan, is a new task to assist us in revision, modification and updating closure/post-closure plans, revise grading plans, prepare gas and leachate management plans, prepare planning level cost estimates/schedules for landfill improvements and prepare cost estimates/schedules for revised closure/post-closure facilities. Task 4, Co-Composting Design Report, will involve finalizing design and operations criteria for upgrading and operating the co-composting facility. Work will include design reports, schematic designs for site development and system modifications, waste stream analysis, estimates, schedules, and implementation plan. Task 5, Long Range Planning Report, includes review of options and development of a business plan regarding solid waste collection and disposal options up to and following closure. Operation of collection and transfer facilities after closure will be evaluated, schematic design of transfer, recycling and associated facilities, and planning level review of feasible landfill land uses will be included. Task 6, Directed Services, has been included to provide for unforseen engineering or other services required during the agreement period. Parametrix, Inc. was determined to be to the best qualified firm. They have the local experience and expertise to provide the landfill and solid waste related services outlined in the scope. Funds for the tasks are either in the current budget or will be requested in future budgets. Tasks will only be executed when funds become available. N:\PROIECTS\20-24PMXXPMXIJAC.WPD WASHINGTON, U.S.A. UTILITY ADVISORY COMMITTEE MEMO DATE: October 17, 2000 TO: UTILITY ADVISORY COMMITTEE ]~ROM: Glenn A. Cutler, Director of Public Works and Utilities ~'t./ SmI,IECT: Agreement with Brown and Caldwell for Wastewater/Stormwater Engineering Services. Summary_: The City's current agreement with Brown and Caldwell is nearing completion and a new agreement for the period of November, 2000 to June 30,2002 is needed for engineering services regarding ongoing wastewater/stormwater requirements and related issues. ~ Forward to Council with a recommendation supporting approval of the agreement with Brown and Caldwell to provide wastewater/stormwater related engineering support services in the amount not to exceed $368,658. The City Attorney shall review and approve the agreement prior to signing. Background /Analysis: The City's current agreement with Brown and Caldwell is nearing completion and a new agreement for the period of November, 2000 to June 30, 2002 is needed to provide assistance on the Wastewater Treatment Plant (WWTP), Combined Sewer Overflow (CSO), Stormwater and related issues. Engineering support under the current agreement included National Pollutant Discharge Elimination System (NPDES) permitting assistance, WWTP operations and maintenance support, Calibration of Plant Flow Meter, Inflow and Infiltration (III) and CSO Reduction Activities, and Rayonier Leachate Impacts. Engineering services and costs proposed in the new agreement include the following: Task 1 Administration and Coordination $ 54,417 Task 2 Continuing Collection System Activities $ 81,254 Task 3 CSO Treatment Technologies $ 6,610 Task 4 Gap Analysis for Federal Programs $ 32,918 Task 5 CSO Reduction Alternatives Evaluation $ 97,495 Task 6 Financial System to Implement Preferred Alternative $ 19,399 Task 7 Collection System Modeling $ 14,995 Task 8 General Directed Services $ 40,642 Task 9 Detailed Design of Septage Receiving Station $ 0 Task I0 Assistance with Stormwater Permitting $20.927 The proposed not to exceed amount of the agreement $368,658 Task I Administration and Coordination: includes activities to manage, administer, and provide ongoing coordination for the project. City Council Memo RE: B&C Contract Page 2 Task 2 Continuing Collection System Activities: includes continuing work activities related to collection system modeling, the roof drain disconnection pilot study and drafting of the final roof drain disconnection ordinance. Task 3 CSO Treatment Technologies: includes review of available CSO control technologies and their applicability to the Port Angeles collection system. Task 4 Gap Analysis for Federal Programs: is an added activity to assist us in meeting the mandated requirements of federal programs (ESA, NPDES Phase II Stormwater, GASB 34 Accounting) impacting our wastewater and stormwater systems. Task 5 CSO Reduction Alternatives Evaluation: is included to identify system problems with CSO's, evaluate alternatives for CSO reduction, and develop a timetable for system upgrades to minimize CSO's. Task 6 Financial System to Implement Preferred Alternative: is to provide a basis for implementing and staging potential FI and CSO control projects. A review of the utility's financial capacity to fund additional capital projects will be undertaken. Tasks 7 & 8 Collection System Modeling & General Directed Services: are included for added engineering assistance and analysis of unfurseen impacts on the WWTP, sewer and storm systems, annexation and large City developments are examples of when we would request assistance in these areas. Task 9 Septage Receiving Station Design: was included in the scope as an activity which may be activated later as a result of current discussions with Clallam County regarding the development costs and needs for local facilities to process septage which is presently trucked to facilities in Shelton and other locations. The design cost was not included in this agreement due to the many unknown factors at this time. If the proposed septage facility is supported to the design level a separate design fee will be negotiated and brought to Council for acceptance as a scope and cost amendment to the agreement. Task 10 Assistance with Stormwater Permitting: has been added in anticipation of the need to implement a stormwater utility next spring to meet the added manpower and operational costs the identified requirements of the mandates discussed in Task 4 above and provide needed stormwater improvements without severe impacts to the general fund. Continuing with Brown and Caldwell is in the best interest of the City due to their in-depth knowledge of existing City programs and projects. We are completely satisfied with Brown and Caldwell's expertise and ongoing engineering support services in the wastewater and stormwater areas. Funds for the tasks are in the current budget or will be requested in future budgets. Tasks will only be executed when funds become available N:\PROJECTS\20-25B&C\B&C-UAC.WPD pOR.?ANGELES WASHINGTON, U.S.A. UTILITY ADVISORY GOMMITT££ I I£BtlO DATE: October 17, 2000 TO: UTIL1TY ADVISORY COMMITTEE PROM: Glenn A. Cutler, Director of Public Works and Utilities-~ SUB,rECT: Change Order; Downtown Watermain/Sidewalk Phase II, Project 99-11 Summary_: A construction change order is proposed to complete the watermain and sidewalk on the east side of Laurel between Front and First Streets. The City's adopted change order policy requires all change orders exceeding $100,000 to be approved by City Council. The contractor, Primo Construction, Inc., has provided an estimated cost of $165,000 for the change order and further cost reductions are being negotiated. It is anticipated that the final negotiated change order will be available prior to the UAC and City Council meetings on October 17, 2000. l~gllllllll~dldlllffi~ If a favorable cost is negotiated forward to Council with a recommendation supporting approval of a construction change order to the Downtown Watermain and Sidewalk Replacement, Phase II Project 99-11. Background / Analysis: The downtown watermain and sidewalk replacement project contract is underway and the current projected cost to complete is $1,000,000 and well within the budgeted funds of $1,330,000. The original scope of the project included completion of the waterlines and sidewalk on Laurel from Railroad to First Street. During design preliminary cost estimates indicated that we would be over budget and we reduced the scope of the work on Laurel Street to include only replacements on the east side between Railroad Avenue and Front Street. To fully utilize the available funding from a Drinking Water State Revolving Fund Loan we are proposing a construction change order to complete the section of watermain and sidewalk on the east side of Laurel between Front and First Streets that was deleted from the original bid package. We have requested the contractor, Primo Construction, Inc., to provide us with an estimate of costs for this addition to the project. Their initial response was in the range of $165,000 and we are negotiating a cost reduction on several items. It is anticipated that the final negotiated change order will be available prior to the UAC and City Council Meetings of October 17, 2000. The City's adopted change order policy requires all change orders exceeding $100,000 to be approved by City Council. Even though the initial bid was low, the initiation of this change order was delayed to evaluate Primo's performance and the projected final costs. Primo's construction performance and dealing with the downtown businesses has been excellent and the projected cost of completion leaves adequate funding for the change order. No work will be performed between Thanksgiving and New Years Day. Attachment: Map N:~PROJECTS\99-1 I\CC02UAC.WPD