HomeMy WebLinkAboutAgenda Packet 12/11/2007 Utility Advisory Committee Public Works Conference Room Port Angeles, W A 98362 December 11, 2007 3:00 P.M. I. Call To Order II. Roll Call III. Approval Of Minutes F or November 13, 2007 IV. Late Items V. Discussion Items A. Water Use Efficiency Goals B. Comprehensive Water System Plan Amendment To CH2M Hill Contract C. UAC Term Limit Ordinance Amendment VI. Next Meeting Date: January 8,2008 VII. Adjournment N:\UAC\Final\121107.wpd UTILITY ADVISORY COMMITTEE I~ - D 7 GUEST SIGN UP SHEET PRINT NAME ORGANIZATION ~ ~ \ ~'-'=t 'i \..)" ~ ~ "",\~i=- \r 'i:.. ~ \J \ ~I-'~""~ \-:l\\\ L \ 'I- DW L ~ IIJ +-. \? 0 L-\ e..'( Pr1vL . " ( L //- 1'-( (i U \< t- u,,! ~ i (I Z ClU e',)" " . . . . . N: \PWKS \LIGHT\ CONS \ CATE \ SIGNUP. wpd Utility Advisory Committee Public Works Conference Room Port Angeles, W A 98362 November 13,2007 3:00 P.M. c;;~/:"}- " L Call To Order Chairman Reed called the meeting to order at 3 :06 p.m. IL Roll Call Members Present: Chairman Reed, Betsy Wharton, Orville Campbell (Via phone) Members Absent: Karen Rogers, Grant Munro Staff Present: Mark Madsen, Bill Bloor, Glenn Cutler, Yvonne Ziomkowski, Scott McLain, Larry Dunbar, Mike Puntenney (3:24), Ernie Klimek, Tom McCabe, Terry Dahlquist, Bob Kajfasz, Cate Rinehart Others Present: Brian Gawley - Daily News IlL Approval of Minutes: Chairman Reed asked if there were any corrections to the minutes of October 9,2007. Councilmember Wharton moved to approve the minutes. Orville Campbell seconded the . motion, which carried unanimously. IV. V. VI. Late Items: November 12 Storm Update Discussion Items: A. Cooperative Service Agreement With US Department Of Agriculture (USDA) Tom McCabe, Solid Waste Superintendent, pointed out that the USDA had provided wildlife management services during the last nine years to alleviate bird strike hazards to aircraft in the vicinity of the City Landfill, which has recently been converted to a Regional Transfer Station. The current agreement will expire on December 31, 2007, and a new agreement for the period of January 1, 2008 to December 31, 2008 needs to be executed. There was a brief discussion Information only. No action taken. B. Water Use Efficiency (WUE) Program Goals UTILITY ADVISORY COMMITTEE November 13,2007 Ernie Klimek, W ater/W astewater Collection Superintendent; explained that the Water Use Efficiency Rule went into effect January 22,2007 mandating that water purveyors establish goals within one year of this date as part of a Water Use Efficiency Program. The City goal is to achieve a one percent reduction in distribution system leakage per year for calendar years 2008 through 2013.. There was a brief discussion. Information only. No action taken. C. Tree Trimming Alternatives In City Rights-Of-Way Terry Dahlquist, Electrical Engineering Manager, noted that tree trimming costs were escalating faster than budgets due to a shortage of qualified tree trimmers and the trimming required to protest overhead power lines was falling behind. Various options were identified with a recommendation for future vegetation control to cut down trees in public rights-of-way, assign City line crews to perform tree trimming, and continue to hire Asplundh as we have been doing for more intensive trimming. A discussion followed. Information only. No action taken. D. Energy Conservation loans Larry Dunbar, Power Resources Manager, advised that some of our largest customers had expressed interest in loans if the terms and conditions were competitive. Two lending institutions have shown interest however the offer is not limited just to them. There was a brief discussion. Councilmember Wharton moved to recommend City Council approve additional loan guarantee agreement with lenders and adopt an ordinance establishing a conservation fund. Orville Campbell seconded the motion, which carried unanimously. E. Conservation Kit Purchase Contract Larry Dunbar, Power Resources Manager, announced that staff proposes to offer City utility customers an energy and water conservation kit at no charge. The kit will be promoted through a coupon inserted into December utility bills and the cost will be reimbursed the Bonneville. There was a brief discussion. Orville Campbell moved to recommend City Council authorze the Director of Public Works and Utilities to enter into a contract for Conservation Kits. VI. Late Item: November 12 Storm Update Mike Puntenney, Deputy Director of Operations, reviewed the events that occurred during the UTILITY ADVISORY COMMITTEE November 13,2007 wind and rain storm which included the loss of several substations and clogged catch basins. It was noted the Light crews sent a 17 hour day restoring electricity and clearing trees. VII. Next Regular Meeting Date: December 11, 2007 VIII. Adjornment: The meeting was adjourned at 4:06 p.m. Chairman Reed Cate Rinehart, Admin Spec II N:\PWKS\LJGI-ITlCONS\CATElnov 13meet. \vpd ~'OR'Ti'J.l N"GY IE' 'LE' 'S' JI "f I ~ " -:,; I 1 ",'7"7' " '.,' ", "., I i ,_ J ,P WAS H I N G TON, U. S. A. Utility Advisory Committee Memo Date: December 11, 2007 To: Utility Advisory Committee From: Ernie Klimek, W aterlW astewater Collection Superintendent Subject: Water Use Efficiency (WUE) Program Goals Summary: The Water Use Efficiency Rule (WAC 246-290) mandates water purveyors establish goals as part of a Water Use Efficiency Program. An open public forum was held on November 29,2007 to inform and involve citizens in the proposed goals of the City's water use efficiency program. The next step in the schedule is to consider public comments then forward a recommendation on the proposed goals to City Council. Recommendation: Forward a favorable recommendation to City Council to approve a resolution establishing goals for the 2008-2013 water use efficiency program. Background/Analysis: On November 13,2007, staff informed the Utility Advisory Committee about the Water Use Efficiency (WUE) Rule that went into effect January 22,2007. The Rule mandates the City establish goals for the City's WUE program by January 22,2008. Additionally, a public meeting was required to allow the public to participate and comment on the proposed goals. On November 29,2007, a public meeting was held which included a staff presentation. The proposed goals and presentation for this meeting were also available on the City's website. Additionally, comments were received at the meeting from the public and were also allowed to be received in writing though December 7,2007. In accordance with the Water Use Efficiency Rule ofthe Municipal Water Law, the City Council which serves as the elected governing body for the water utility, must review and consider all comments received. Comments received as of the drafting of this memorandum are included as an attachment to this memorandum. Additionally, based on the comments received, staffhas modified the proposed WUE program goals which are stated as part of the attached resolution. An update to the attachments of this memorandum will be presented at the Utility Advisory Committee meeting should any additional comments be received. Staff recommends the Utility Advisory Committee forward a favorable recommendation to City Council to approve a resolution establishing goals for the 2008-2013 WUE program. The City Attorney has reviewed the proposed resolution. Attachments: Summary of Comments from the Public with Supplement Resolution adopting WUE program goals N:\UAC\DepDir\Water Use Efficiency - Goals.doc CITY OF PORT ANGELES WATER USE EFFICIENCY (WUE) PROGRAM Open Public Forum Meeting Summary Port Angeles City Council Chambers November 29, 2007 - 6 p.m. ATIENDANCE: Citizens - City Staff: Paul Lamoureux Cherie Kidd Bob J ohnsberg Vicky Alward Margie Kepner MikeKitz Cindy Kelly Tom Martin Shirley Nixon Mark Madsen, City Manager Michael Puntenney, Deputy Director Public of Operations Teresa Pierce, Executive Communications Director Ernie Klimek, W ater/W astewater Collection Superintendent Larry Dunbar, Power Resources Manager Bob Kajfasz, Commercial Energy Analyst Teresa Pierce, Executive Communications Coordinator, welcomed the audience, introduced staff, and gave a brief overview of the evening's program. Mark Madsen, City Manager, provided opening remarks noting the importance of conservation and stewardship of our water resources. Ernie Klimek, Water/Wastewater Collection Superintendent, opened the Water Use Efficiency Rule (WUE) power point presentation noting the City's proposed goals have been available on the City website. His discussion included the importance of the stewardship of our current and future water resources, the history of the WUE, and a summary of the WUE requirements, deadlines, and reporting standards. Larry Dunbar, Power Resources Manager, addressed conservation rate options and residential and commercial customer water consumption trends. His presentation also summarized the City's supply, demand, and leakage forecasts. Bob Kajfasz, Commercial Energy Analyst, reviewed the supply and demand side measures which include the continuation of leak detection surveys, meter replacement, meter calibrations and demand-side conservation measures. Ernie Klimek, Water/Wastewater Collection Superintendent, continued with discussion of the evaluation of reclaimed water and accounting for other authorized uses of water in the City. He also discussed the City's proposed WUE program goals to achieve a one percent reduction in distribution system leakage per year for calendar years 2008 through 2013. Summary of Public Comments: Paul Lamoureux, 602 Whidbey Avenue, provided comments at the Open Public Forum. His comments are summarized below: · He is encouraged that conservation is being mandated and recognized that citizens have already been practicing water conservation. · He recognizes that water rates may need to be increased when water is conserved. · He asked that when the City encourages [a customer to practice] water conservation that we consider how we can save that person money. · He asked that the City promote more services at less cost. · He has a concern that residential water customers may be subsidizing commercial water customers through the existing rate structure. · He recommended that the City consider a tiered rate structure based on the more you use the more you pay. · He recognizes that the City's water system infrastructure is aging and encourages the City to address infrastructure repair and replacement in the budget. · He suggests that with the potential of an increased need for [fresh] water that removal of the Elwha dams is a bad idea. Shirley Nixon, 1029 West 5th Street, provided comments as a citizen and as a representative of The Center for Environmental Law & Policy at the Open Public Forum. Her comments are summarized below: · She is a Senior Attorney for the Center for Environmental Law & Policy, a public interest group that focuses primarily on water law. · She has a background and history in water law and was involved in developing the Water Use Efficiency Rule. · She recognized that there is some confusion in the way the law and WUE rule is written, which may complicate WUE implementation. · She applauded the City for providing the Open Public Forum and information session on the WUE. · She recognized that the City has a good water supply and that our citizens do not appear to be wasteful with the resource. · She emphasized that in the State of Washington that the water resources are the public's water and that we only have a right to use it. Therefore, there is a broader group of interested parties that may have concerns about the City's water use and water use efficiency. · . She emphasized that the City's water use is in the "spotlight" because of the Elwha dam removal and river restoration project. She stated that there is a public perception that delays in dam removal have occurred because of the water treatment works associated with the City's water supply. · She is encouraged that the City is approaching the WUE rule from the perspective of stewardship of the resource and promoting conservation. . She recommends that the City expand its WUE goal to include a quantifiable demand-side goal. . She stated that she thinks the City's WUE program and Open Public Forum are a good model for other utilities to follow from a statewide perspective. . She stated that she will be providing written comments as a citizen and on behalf of the organization that she represents. Teresa Pierce, Executive Communications Coordinator, concluded the meeting after sharing that today's presentation will be available on the City's website in the near future, that additional comments can be submitted to her by December 7,2007, and the next steps include a Utility Advisory Committee meeting on December 11 th and a City Council meeting on December 18th. Open Public Forum concluded: 7:25 p.m. Meeting summary notes prepared by: ~ leo/do 7 Date Bob Kajfasz, Commercial Energy Analyst City of Port Angeles Water Use Efficiency Program Open Public Forum Meeting Review and Consideration of Public Comments (Supplement to Summary of Public Comments) 1. Review of Comments from Paul Lamoureux, 602 Whidbey Ave: Staff reviewed comments and found them to be a general discussion of Utility rates and conservation. Mr. Lamoureux's made a request to consider a tiered rate based on consumption (the more you use; the more you pay). It is noted that this is already a requirement of the Water Use Efficiency Rule separate from goal setting. An evaluation is required that considers the affordability of water rates as well the feasibility of adopting and implementing a rate structure that encourages water demand efficiency. Further guidance is provided in the Washington State Water Use Efficiency Guidebook which requires the "inclining block" and "seasonal" rate structures be evaluated. This evaluation is planned for the 2008 water rate study. 2. Review of Comments from Shirley Nixon, citizen and representative of the Center for Environmental Law & Policy, 1029 West 5th Street: Staff reviewed comments and found them to be a general discussion ofWUE background and her involvement with the rule. She recognized the supply side nature of the goal in draft form and, if possible, asked to have a quantifiable demand side goal added to it. Ms. Nixon's request for a demand side goal has been considered and the draft goal has been amended to include a quantifiable demand side goal. /-" --) RESOLUTION NO. A RESOLUTION of the City Council ofthe City of Port Angeles, Washington, approving goals for the City's 2008-2013 Water Use Efficiency Program. WHEREAS, the City strives to ensure its citizens have a safe and reliable water supply through development, operation, and maintenance of water quality protection facilities; and WHEREAS, on January 22,2007 the Washington State Department of Health adopted a Water Use Efficiency (WUE) Rule requiring municipal water suppliers with 1,000 or more connections to develop a Water Use Efficiency Program for the period of January 2008 through December of2013; and WHEREAS, the State of Washington found and declared the conservation and efficient use of water to be a public purpose of highest priority; and WHEREAS, the City Council, as the governing board ofthe City's water utility, must approve goals for the City's 2008-2013 Waste Use Efficiency Program; and WHEREAS, on November 29, 2007 the City of Port Angeles held a public meeting to provide the opportunity for consumers and the public to participate and comment on the water use efficiency goals; and WHEREAS, on December 18,2007, pursuant to the procedures and requirements of the Water Use Efficiency Rule, the City Council considered and discussed the goals and comments received during the public forum relating to the City's 2008-20 13 Water Use Efficiency Program. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles as follows: -1- ,........'1"t...... \,~) The City Council hereby adopts the following goals forthe City's 2008-2013 Water Use Efficiency Program: A. The City of Port Angeles Water Utility will implement a program intended to achieve a one percent reduction in distribution system leakage per year and improve the accuracy and accountability of the system through meter replacement and calibration. B. The City will implement a program intended to achieve a two-tenths of one percent reduction in customer consumption per capita per year including offering a minimum of six water use efficiency measures across the Utility's customer classes. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 18th day of December 2007. Karen A. Rogers, Mayor ATTEST: Becky J. Upton, City Clerk APPROVED AS TO FORM: William E. Bloor, City Attorney G:\Legal_ BackupIORDINANCES&RESOLUTIONSIRESOLUTIONS.2007\R2007 -21 WUE Resolution. wpd December 7. 2007 : I '....-./ -2- CLEAN. FLOWING WATERS FOR WASHINGTON The Center for Environmental Law & Policy December 7,2007 City Council Members, City of Port Angeles Port Angeles Water Utility Superintendent Ernie Klimek P.O. Box 1150 Port Angeles, WA 98362 Attention: Executive Communications Coordinator Teresa Pierce; tpierce@citvofpa.us COMMENTS ON WATER USE EFFICIENCY GOALS FOR THE CITY OF PORT ANGELES WATER SYSTEM Thank you for the opportunity to provide feedback on the City's Water Use Efficiency Goals. This goal-setting process, mandated by a 2003 state law, requires that municipal water suppliers set water conservation goals "to enhance the efficient use of water by the water system customers." RCW 70.119A.180(4)(c). According to Water Efficiency Rules adopted pursuant to this law by the Department of Health, the term "Water Use Efficiency (WUE)" means "increasing water supply efficiency and water demand efficiency to minimize water withdrawals and water use." WAC 246-290-010. The elected governing body of a public water system must establish water use efficiency goals in a public forum, and the goals must include, among other things, measurable outcomes and a schedule for achieving the goals. WAC 246-290-830(6). The law also directs that water distribution system leakage standards be developed "to ensure that municipal water suppliers are taking appropriate steps to reduce water system leakage rates ...". RCW90.119A.180(4)(b). The Center for Environmental Law & Policy (CELP) is a non-profit membership organization dedicated to protecting the public's interest in clean, flowing waters for Western Washington and the Columbia River Basin. CELP's advocacy for ecologically and socially responsible water laws and policies includes membership on the Washington State Department of Health's Water Supply Advisory Committee (WSAC), and membership on the Water Use Efficiency Subcommittee that helped develop the Water Use Efficiency Rules referenced above. It is from this perspective that CELP offers the following comments and recommendations on the City of Port Angeles' proposed Water Use Efficiency Goals. BOARD OF DIRECTORS: Karen Allston - Anne Johnson - John Osborn, MD - Rachael Paschal Osborn HONORARY BOARD: Billy Frank .Ir. - Prof. Estella Leopold - Gov. Mike Lowry - Prof. Charles Wilkinson Mailing address: 25 West Main, Suite 234, Spokane, WA 99201 Spokane: 509.209.2899 Seattle: 206.547-5047 Olympia 360.754.1520 www.celp.org Center for Environmental Law & Policy Comments on Port Angeles' Water Use Efficiency Goals; December 7, 2007 p.2 Enhance leakage reduction goals: It is important for the City to expeditiously address leakage from its water distribution system, and it has recognized this in its goal-setting process. Proposed goals are to refine baseline production and water use data and reduce system leakage from the current level of 22% by 1 % per year from 2008 through 2013. CELP recommends that the City consider devoting even greater resources to leak reduction measures such as additional strategic meter installation, replacement, and calibration so that distribution system leakage can be reduced at a quicker pace. Adopt measurable demand side goals: The City should adopt one or more measurable goals focused upon reducing customer demand. Although documents refer to an intent to continue offering water conservation measures, the City has failed to set measurable goals designed "to enhance the efficient use of water by [its] customers" as RCW 70.119A.180(4)(c) directs. CELP suggests that such goals include: . Reducing per capita water consumption by single-family residential customers to 65 gpd . Reducing water consumption across other customer classes by 5% · Reducing peak production volumes by 5% Step-up meter replacement: CELP congratulates the City for its past and current investments in water metering (an important water use efficiency measure), and recommends that it set a goal of replacing 10% of its service meters per year. Such a goal would address both demand side and supply side water efficiencies. Revisit Water Use Efficiency goal-setting in 2010. CELP recognizes that Water Use Efficiency goal-setting is a new process, and one that is highly dependent upon consistent data gathering and baseline water-use benchmarks. It takes time to gather and analyze water use data, and CELP applauds the City's commitment to doing so. CELP also recognizes that the on-going federal project to remove the Elwha Dams is bringing about changes in the City's water system operations, and it is too soon to know how these changes might affect water supply characteristics and water use efficiency. Therefore, CELP respectfully requests that the City consider re-visiting the water use efficiency goal setting process in three years, rather than waiting for the full six years that the ruies aliow. A three-year time frame will not only allo\iv a quicker assessment of goal achievement, it will also allow the City to more promptly foresee and budget for water utility operations. Thank you for conducting a well-publicized and informative public goal-setting forum, for the helpfulness of City staff in providing additional information, and your courtesy in considering CELP's comments. Sincerely, ....... ~ '.""~-'_:""""'~""""~~. ,-r- ':"--" !'-... nO"R' 'TI' AN 1 G' IE' 'L' E'IS 1:::' j '", '.k.' I'] I, ,', d WAS H I N G TON, U. S. A. Utility Advisory Committee Memo Date: December 11, 2007 To: Utility Advisory Committee From: Stephen Sperr, P.E, City Engineer Subject: Amendment No.1 to the Consultant Agreement with CH2M Hill, Project 07-08 Summary: The City is required to update its Comprehensive Water System Plan every six years. CH2M Hill has been selected to continue to provide the City its expertise in this effort, as it has done for the previous three Plans. Recommendation: Forward a favorable recommendation to City Council to authorize the Mayor to sign Amendment No.1 to Agreement 07-08 with CH2M Hill, for completion of an update to the Comprehensive Water System Plan, increasing the Agreement by $235,000.00, for a total Agreement amount not to exceed $348,000.00. Background/Analysis: In April 2007, the City entered into a new contract with CH2M Hill, in order to continue to retain their engineering services, helping to ensure that mitigation measures developed by the federal government under the Elwha River Ecosystem and Fisheries Restoration Act do not adversely impact the City's potable and manufacturing water systems. As in the past most, but not all, costs incurred under the Agreement will be reimbursed by the National Park Service. These services are ongoing and expected to continue until at least the end of2009. Two other tasks were in the original Agreement: (1) the design of a corrosion control facility that will address elevated levels of copper in the water distribution system, and (2) a "directed services" task to address the need for assistance on unforeseen issue(s) that may come up during the timeframe of the Agreement. The City is required by the Washington State Department of Health to update its Comprehensive Water System Plan (WSP) every six years. CH2M Hill has been selected to continue to provide the City its expertise in this effort, as it has done for the previous three Plans. The need to update the WSP is not only due to the DOH requirement, but the following impacts to critical elements of the WSP: · Declaration of the Elwha Ranney collector supply as groundwater under the direct influence of surface water resulting in the requirement for a Watershed Control Program · Implementation of corrosion control by the City Amendment No.1 to CH2M Hill Agreement 07-08 December 11, 2007 Page 2 of3 · Construction of a new water treatment plant for the Elwha Ranney collector supply · Compliance with requirements of the Stage 2 Disinfection Byproducts (DBP) Rule and the Long Term 2 (LT2) Enhanced Surface Water Treatment Rule · May 2006 Fluoridation ofthe city's water supply · Creation of a new hydraulic model developed from the City's GIS system to replace the existing hydraulic model that was developed and calibrated in 1994 · Adoption ofthe HB 1338, the Municipal Water Law (MWL) that established new principles related to water rights place of use, duty to serve and water use efficiency The scope of work that will be added to the Agreement with CH2M Hill as Amendment No.1 addresses these issues and is organized into the following tasks, which closely mirror the chapters in the WSP: 1. Data Collection 2. Description of Water System 3. Planning Data and Water Demand Forecasting 4. System Analysis 5. Water Use Efficiency, Water Rights, System Reliability, and Interties 6. Source Water Protection 7. Operation and Maintenance Program 8. Distribution System Facilities Design and Construction Standards 9. Capital Improvement Program 10. Financial Program 11. Miscellaneous Documents 12. Executive Summary 13. Hydraulic Modeling 14. Document Preparation and Reviews 15. Project Meetings, Accounting and Invoices The table below summarizes costs for all tasks in this Agreement: Original Adjusted Amount Expended Agreement through To Date Task Description Amount Amendment No. 1 1 Corrosion Control Facility $38,000 $38,000 $24,818.31 2 Elwha Dam Mitigation $50,000 $50,000 $6,263.14 3 Directed Services $25,000 $25,000 $0.00 4 Water System Plan -- $235,000 -- Total $113,000 $348,000 $31,081.45 Other than a portion of Task 2 being reimbursed by the National Park Service, the funding for these tasks are from the Water Utility. The approved 2008 Water Utility Budget includes $250,000 for Task 4, the Comprehensive Water System Plan update. Amendment No.1 to CH2M Hill Agreement 07-08 December 11, 2007 Page 3 of3 It is recommended that the Utility Advisory Committee forward a favorable recommendation to City Council to authorize the Mayor to sign Amendment No. I to Agreement 07-08 with CH2M Hill, for completion of an update to the Comprehensive Water System Plan, increasing the Agreement by $235,000.00, for a total Agreement amount not to exceed $348,000.00. Attachments: Detailed Scope of Work for Task 4 12/7/2007 Attachment 1 Scope of Work for the 2008 Port Angeles Water System Plan Update CH2M HILL (Consultant) will provide the following services related to the required 6-year update of the City of Port Angeles' (City's) existing Water System Plan (Plan), dated March 2002. The character and content of the 2008 Plan update is driven both by the general requirements of Washington State Department of Health(DOH)andother events and factors that have occurred since the previous Plan was prepared. Thet;eother events and factors include: · Declaration of the Elwha Ranney collector supply as groundwater undetthedirect influence of surface water resulting the requirement for a Watershed Control Program (This requirement predates the 2002 Plan update, but WDOH agreed to defer its requirement because the required surface water treatment facilihj was notin place and the City was operating the system based on interim requirementsuJttil.the surface watertreatment facility is installed.); · Implementation of corrosion controlpy the City {scheduled for installation by June 2008); · Construction of a new water treatment plant for the Elwha Ranney collector supply (This project has been designed and1vill be under construction while the Plan is being prepared); · Compliance with requirements of the Stage) Disinfection Byproducts (DBP) Rule and the Long Term 2 (L T2) Enhanced Surface Water Treatment Rule (These had not been promulgated.in 2002 and the type QfS"llrface water treatment from the Elwha project had not been defined.); · May 2006 Fluoridation of the city's water supply; · Creation of a new hydraulic model developed from the City's GIS system to replace the existing hydraulic model that waS developed and calibrated in 1994. · Adoption of the HB 1338, the Municipal Water Law (MWL) that established new principles related to water rights place of use, duty to serve and water use efficiency. Conformance with the new requirements of the MWL affects several elements of the Plan, and as a result, is addressed in several of the tasks presented herein, as follows: · Place-of-use-documentation will be addressed in Tasks 2.5 and 2.6 (Existing and Future Service Areas) and Task 5 (Water Rights) · Duty-to-Serve (and timely and reasonableness) are addressed as part of Tasks 2.8 and 2.9 (Service Area Policies and Conditions Of Service) · Water Use Efficiency is addressed in Task 3.1 (Current Population, Service Connections, Water Use, and Equivalent Residential Units) and Task 4.3.1 (Source) in support of the Water Use Efficiency Program itself, which is developed as part of Task 5.1 The Plan will be prepared in general conformance with the format provided in Washington ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 1 OF 19 12f712007 State Department of Health's (WDOH's) 1997 Water System Planning Handbook (Planning Handbook). The budget for these services is presented in Attachment 2 on a per-task and per-subtask basis. These per-task and per-subtask budgets were developed to establish the level of effort for each task as well as to establish the overall project budget. These task budgets are not contractually binding. They are presented to identify the composition of the overall budget, which provides the contractually binding, not-to-exceed contract limit. Project invoices will be submitted to the City allocating incurred labor and expense costs at the task level. Task 1. Data Collection City staff will provide information and data to Consu.ltant. Much of the needed information can be collected and provided prior to execution of specific tasks. Other information, input, and decision-making will be provided by City staff throughout the course of Plan development and is not specifically identified as part of thissubtask. The information listed below will be provided by the City to Consultant in electronic format where available (or in hard copy if not): . WRIA 18 Watershed Plan · Water production data, as recorded froIIrallapplicable source meter locations since 2000, in electronic format · Consumption information (billing records) since 2.000 in electronic format categorized by user classification · Adopted City water system and service policies and regulations · Water service forms and agreements · Water resale or wholesa.le agreements · ConSumer complaint records · Adopted City and Clallam County Growth Management Maps, Plans, and PoliCies · City's adopted Fife CodejFifeFlow Requirements · Current City Water Quality Monitoring Program · List and map of water system improvement, additions and betterments made since the completion of the 2002 WSP · City's current Vulnerability Assessment for the Water System · Water System staffing information including names, position, certification and responsibility · List of current equipment and chemical inventories including locations, quantities and uses · Facilities maintenance schedules · Current Cross Connection Control Program · City water system policy and design criteria · Current water system standard details · City standards for record drawing, inspection, pressure testing, disinfection and sampling · Current copy of the City's Consumer Confidence Report · Historical population (since 2000) ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 2 OF 19 12/7/2007 · Population projections from the City's current Comprehensive Plan or other City- recognized analysis for the City and proposed future UGA (if available) · Current Land use or zoning map for City current UGA and proposed future UGA · Water quality data since 2000 and all documentation of the City's water quality monitoring program (coliform monitoring plan, organics monitoring plan, inorganics monitoring plan, etc.) · Water utility operating expenses and revenue over the past 6 years, including grants, loans, system development charges, etc. · The City's current water rate structure and previous rate structures since 2000 · PRY settings and pump curves · Copies of all City permitted or perfected water rights arid any water right claims, including those which have been recently revised as well as proposed revisions · Geographic Information System (GIS) or CAD mapping of the water system with pipe size, materials, age, valves, and hydra.nts · Parcel, Critical Areas, hydrologic and topographic databases and maps (latest updated versions) for the City, its Urban Growth Area, and watershed 1.1 Pre-Planning Conference Consultant will schedule, coordinate and attend a pre-planning. conference with the City and WDOH staff. Consultant's participation, including the project manager and project engineer/planner, in the pre-planning meeting with City and WDOH staff is budgeted as part of Task 15. The agenda for the meeting will be prepared by the Consultant. Meeting notes will be prepared by the Consultant and distributed upon completion of the meeting for review, comment, and concurrence. 1.2 Data Collection Process Consultarit's services~th respect to thistaskwill include review of information provided and follow-up coordination with City staff to ensure all needed information is provided. Consultant will also coordinate wit.hCity staff during the data collection process. This includes coordination with City staff over the telephone, submitting lists of data needs to the City, and reviewing data provided by the City. Consultant will review previous plans, existing system information, data and facility as-builts. Consultant will visit each facility with City staff to collect field information and observe equipment layout and existing condition and take digital photographs of each element of the water system. Task 2. Description of Water System Consultant will prepare a description of the City's water system in conformance with the requirements of the Planning Handbook, Chapter 1. The specific subsections assumed to comprise the Description of Water System section will include: · Ownership and Management · System Background · Inventory of Existing Facilities · Related Plans · Existing Service Area Characteristics ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 3 OF 19 1217/2007 . Future Service Area . Service Area Agreement . Service Area Policies . Conditions of Service . Complaints In general, information provided in Section 1 of the existing Plan will be used to complete the "Description of Water System" section. Where updated information is necessary, it will be provided by the City in electronic format for inclusion and formatting by Consultant into the Plan. 2.1 Ownership and Management Consultant will prepare a brief discussion of the ownership and management of the City's water system. The discussion will include the name andWDOH-ideritification number, the type of ownership (e.g. municipal), management and decision-making process, and include a copy of the City's latest updated Water Facilitieslnventorysheet (prepared by City staff) as an appendix. It is expected that this section of theWSPwilI be produced by replicating the contents of the 2002 plan with only minor edits toreflect any changed facts since the 2002 plan was written. 2.2 System Background Consultant will prepare a discussion regarding the hlstory of the water system as well as current and projectedgrowthtrends. The discussion of the history of the water system will be updated from the existing Plan with additional updated information as provided by City staff. City staff wilIprovide inPtlt on the location and type of current and projected growth trends for the water system. Consultant will update the discussioriregarding the geography of the water system from the existing Plan. Consultant will briefly describe the basic information that affects design standards and fire flow reqllirements. Design standarQ.s and fire flow requirements will be discussed elsewhere in the Plan and referenced from this section. It is expected that this section of the WSP will be produced by replicating the contents of the 2002 plan with only minor edits to reflect any changed facts since the 2002 plan was written. 2.3 Inventory of Existing Facilities Consultant will update tables and narrative description of existing facilities presented in the 2002 Plan. References will be provided to other sections of the Plan where more detailed discussion of these system attributes is presented. 2.4 Related Plans Consultant will update the brief discussions of related plans and planning efforts, as presented in Section 1.4 of the current Plan, that are relevant to the updated Plan. The City will inform Consultant of any other local or regional planning efforts that are relevant to this Plan update. ATIACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 4 OF 19 12f712007 2.5 Existing Service Area Characteristics Consultant will briefly describe the extent of the existing service area based on text from the existing Plan and prepare a map displaying the service area boundary. Individual pressure zones will also be displayed on the map. The urban growth area boundary will also be shown on the map. Consultant will summarize regulations related to the water system that affect design including level of service and fire suppression requirements. Applicable ordinances or resolutions will be included in appendices as appropriate. Consultant will prepare a brief discussion of the land use zoning within the service area and prepare a map that displays land use zoning categories. The City' s latest land use zoning information will be reflected in an updated map. Electronic land use zoning information will be provided by the City for these areas for incorporation into the map. Land use zoning descriptions will be included. It is expected that thi$isection of theWpP will be produced by replicating the contents of the 2002 plan with only minor edits to reflect any changed facts since the 2002 plan was written. 2.6 Future Service Area The future service area is expected to include the City's Urban Growth Area. Consultant will prepare a narrative description that relates to the map described above. The City shall describe near-term and longer-term expansion plans for the water system as well as annexation to Consultant for Consultant's inClusion of this information into the Plan, or the City shall modify text from Section 1.5.2 of the ex:isti.11g Plan to reflect these plans and expectations. 2.7 Service Are.a Agreements At this time, Consultant-understands that no agre~ments are currently in place and that there are noplans for developing any such agreements unless they become required by WDOHdurmgtheplanningprocess.Consultant shall reproduce the text from Section 1.6 of the exiSti.11g Plan t():refl.ect the cUrrent condition. 2;8 Service Area Policies The Consultant will prepare a summary of current service area policies based on the current policies provided by the City from Task 1. These service areapolicies are assumed to include, but not be limited to, those relating to: wholesaling water,annexation, design and performance standards, surcharges for outside customers, formation of local improvement districts, the urban growth area, late-comer agreements, over-sizing of facilities, cross-connection control, and extensions. The City's service area policy text will include, where applicable, references to City ordinances, resolutions, and municipal codes. It is expected that this section of the WSP will be produced by replicating the contents of the 2002 plan with only minor edits to reflect any changed facts since the 2002 plan was written. ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 5 OF 19 121712007 2.9 Conditions of Service The Consultant will reuse the Conditions of Service content from the 2002 WSP with any additions and or revisions that are appropriate - based on information provided by City. In addition, the narratives and policies related to this issue will be revised and updated to conform to the Municipal Water Law principle of Duty-to-Serve (see (RCW 43.20.260). Duty-to-Serve compliance will address the required parameters of . Capacity, . Consistency . Water Rights, and · Timeliness and Reasonableness 2.10 Complaints Per the Planning Handbook, the City will suminarize the number and natur~of complaints received by the City related to the water system aridhow the complaints were addressed. The City will also summarize the City's record keeping procedures for complaints and the policy and process for addressing complaints. Consultant will include the City-developed discussion on complaints in the Plan.lfisexpected that this section of the WSP will be produced by replicating the contents of the 2002plan with only minor edits to reflect any changed facts since the 2002 plan was wfitten.Thework on this element will be coordinated with the work efforts and product~Jor Section6, Operations and Maintenance. Task 3. Basic Planning Data and Water Demand Forecasting The purpose of this section of tlte Plan is to estimate future water demands so that facility improvements can be effectivelY-planned. These data will be compiled and presented in a manner thatconforrns to thean:lended requirements of WAC 246-290 related to the Water Use Efficiency (WUE)requirements of the Municipal Water Law. Consultant will prepare descriptions and projections for this section of the Plan based on data and information from Section 2 of the city's 2002 Plan and updated data provided by the City. Consultant will coordinate with Nathan West, City Planner during the development of this work element. 3.1 CurrentPopulatiofl, Service Connections, Water Use, and Equivalent Residential Units Current City population will be presented in the Plan along with the current number of service connections, current water usage, and current water usage converted to Equivalent Residential Units (ERUs). Data will be presented primarily in tabular and graphical form. The purpose of this activity is to establish current water demand, recent historical demand trends, and per-capita demand and consumption trends. Per-capita and unaccounted water will be computed and documented in a manner that conforms to WUE requirements of the Municipal Water Law. 3.2 Projected Land Use, Future Population Employment and Water Demand Projected growth in water demand will be based on forecast population and employment growth. The City will provide Consultant with forecast growth that conforms to adopted ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 6 OF 19 12fl12007 Growth Management Act plans, policies and requirements. The City will provide identify and describe any projected changes in land use that might affect growth in population and water demand. Consultant will include this information on projected land use trends, if any, in the Plan and develop demand forecasts in a manner that conforms to WUE requirements (see Subtask 5.1). Task 4. System Analysis Consultant will analyze the City's system with respect to water quality, source of supply, treatment, storage, and distribution in conformance with the requirements of Chapter 3 of the Planning Handbook based in large measure on SectionS of the 2002 Water System Plan. 4.1 System Design Standards The design and performance standards applicable to the City's water system will be identified and briefly discussed for each of the design and performance standards, as presented on pages 13 and 14 of the Planning Handbook. References to Cithersections of the Plan where these standards are discussed in greaterdetail1iVillbe included. Itis expected that this section of the WSP will be produced by replicating the contents of the 2002 plan with only minor edits to reflect any changed facts since Section 3 of the 2002 plan was written. 4.2 Water Quality Analysis and Compliance Consultant will summarize the City's compliance sta.tus with respect to current and anticipated future Safe Drit'iking Water Act requirements. This compliance status will be summarized in tabular format similar to that of Table 3-1 from the existing Plan. Narrative discussion, excerpted from the 2002 Plan and updated, will be prepared for corrosion control, GWlcomplianEe, Surface Water Treatment Rule compliance (includingStage 2 DisirifectiCiriRi1.leand Long Term 2 Enhanced Surface Water Treatment Rule). In.additioIl.,Consultantwill prepare a brief discussion of the City's implementation of fluoridation in May of 2006. Consultant's responsibilities with respect to this analysis will be to incorporate updated information provided by the City, and will not involve review of laboratory or other raw data documentation. The City's new surface water treatment plant which is expected to be placed into service by 2010 is anticipated to comply with all applicable surface water treatment rule requirements. The City's anticipated compliance with respect to the surface water treatment rule will be briefly summarized. Planning and design documentation, prepared by others, related to the forthcoming water treatment plant will be briefly summarized and referenced from the Plan. 4.3 System Description and Analysis Consultant will describe the condition of each of the City's water system facilities and assess their physical capacity with respect to meeting current and projected demand. In addition, Consultant will estimate the remaining useful life of these facilities. The facilities to be addressed include such system components as PRY stations, storage tanks, chlorination stations, pumping stations, overall system control, supply source system, meters, and ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 7 OF 19 1217/2007 distribution system. The source of the description and analysis will be the existing 2002 Plan and input provided by City staff. 4.3.1 Source Consultant will prepare a discussion of the City's Elwha River source of supply. Additional information, if necessary, will be developed by consultation with City staff and provided in electronic format to Consultant for inclusion in the Plan. Reference to the City's Watershed Management Plan will be included for more detailed information. Documentation of source capacity and withdrawals will be compiled and presented in a manner that conforms to WUE requirements (see Subtask 5.1). 4.3.2 Chlorination A brief discussion of the City's existing chlorination ~ysfem at City Lake will be prepared. In addition, Consultant will prepare a brief discussion of possible fut:i1re chlorination and enhanced disinfection facilities resulting from anticipated regulation. 4.3.3 Fluoridation A brief discussion of the City's existing fluoridation.system will be prepared based on information provided by the City in Task 1. 4.3.4 Corrosion Control A brief discussion of the City's imminentcot:tosion control program will be prepared based on information provided by the City in Task 1. 4.3.5 Source Treatmel1t A brief discussion of the City's proposed source treatment will be prepared based on the work products completed for Task 4.2. 4.3.6 Pump Stations Consultant willduplicatethenarrativeafidtabular presentation of the City's pump stations and analysis of these facilities (Section 3.9 of the existing Plan) and revise it based on updated demand information and other input from City staff. 4.3.7 Storage Consultant will duplicate the narrative and tabular presentation of the City's storage facilities and analysis of these facilities (Section 3.8 of the existing Plan) and revise it based on updated demand information and other input from City staff. 4.3.8 Distribution System Consultant will prepare a description of the City's distribution system. Consultant will prepare a map or maps showing all City pipelines (with pipe sizes shown), and a table summarizing the total length of all pipelines in each pipe size category, per information provided from the City's geographic information system (GIS). Similarly, a table summarizing all of the City's pipelines by pipe material will be presented, per information from the City's GIS, if this information is readily available and reliable. In addition to distribution system pipelines, master meters and PRY s will be identified and described in tabular format (the same as the existing Plan). The major part of the assessment of the distribution system will be the development, calibration, and use of a hydraulic model of the Cih/ s system to evaluate its capacity to meet fire flow and system ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 8 OF 19 12/7/2007 pressure criteria. The scope of this activity is presented later in this Exhibit as Task 13, Hydraulic Modeling. 4.4 Summary of System Deficiencies Based in the results of Subtask 4.3 and Task 13, Consultant will prepare a summary of system deficiencies identified as part of the system analysis subtasks. This summary will be presented primarily in tabular format with additional text description provided for more complex improvements, as necessary. 4.5 Selection and Justification of Proposed Improvement Projects Consultant will prepare a table summarizing the selectionofproposed improvement projects for the 6-year planning horizon and 20-year planning horizons. Alternative remedies for each of the deficiencies will be identified(ifapplicable),i31ld compared, as required by the WDOH Planning Handbook. Text description will be.provided to justify and support the selection of the proposed improvement projects. Task 5. Water Use Efficiency, Wat~r ~ights, System Reliability, andJ.nterties Consultant will prepare a section of the PlCl.J:lJhat addresses the following issues, as required in Chapter 4 of the Planning Handbook,WDOH's March 2004 Interim Planning Guidance, the January 22, 2007 Water Use Efficiency Rule, arid the Water Use Efficiency Guidebook. These work products willbe.integrated into anupdatedSection 4 of the Water System Plan. 5.1 Water Use Efficiency and Conservation Program A conservation programwill be developed in conformance with the WDOH's Conservation Planning Requirements handbook@drequirementsfrom the Municipal Water Law. Documentation ofconformartce with WUE requirements will be compiled and presented in the Plan where applicable. Elements required for WUE conformance include: · Supply Characteristics. (see Subtask 4.3.1) · Consumption data (see Subtask 3.1) · Demand Forecasting (see Subtask 3.2), and a · Water Use Efficiency Program The WUE Program must include a discussion of the City's current water conservation program (see following paragraphs), required WUE measures, and WUE measures that must be evaluated. The WUE Program must also address Distribution System Leakage (DSL) along with documentation of conformance with WDOH DSL Standard. Consultant will utilize the products from other tasks to complete many aspects of this work. Consultant will also prepare a draft WUE Program that complies with the minimum requirements and present the draft for City's review. Consultant will meet with City staff to discuss the draft, the WUE requirements, and solicit City's input in an effort to ensure the Program meets the City's specific objectives. WUE requirements mandate a public process to set WUE goals and select appropriate measures to address WUE. Consultant will assist City staff with planning, organizing, ATTACHMENT 1 TO CH2M HILLAMENDMENT - SCOPE OF WORK PAGE 9 OF 19 12nt2007 notifying and recording the required public process for WUE goal-setting and program definition. This scope assumes two public forums will be held in Port Angeles to address WUE. This scope assumes that the City will be responsible for the actual conduct and recording of the public process associated with MWL WUE requirements. The city will provide records of the public process and their outcomes to Consultant for incorporation into the WSP. In addition, WUE rules require evaluation of both water rates (in relation to conservation and efficiency) and water reclamation opportunities. Consultanfwill integrate the required evaluation of water rates in regard to water use efficiency with Task 10, Financial Program. Consultant will coordinate with City staff to identify possible opportunities for reclaimed water opportunities and evaluate them both technically(as par1:of this task) and financially (as part of Task 10). Annual performance reporting is another required element of the WUEi"ule. Consultant will prepare draft forms that can be used by City-staff to comply with the annual reporting requirements. Based on review of comments from City staff,. Consultant wiUfinalize the reporting forms. These forms will be included in the Plan in an appendix. The conservation program will be developed by Consultant with input, as described above from City staff with the following main sections, as required by the Conservation Planning Requiremen ts: · Conservation Objectives · Evaluation of Conservation Measures · Identification of Selected Conservation Activities · Target Water Savings Projections Most of the program developmenfwillbe mostly derived from the existing Plan and modified as necessary by Consultant to conform to WUE requirements. Target savings per conservation measure selected for implementation by the City will be presented based on readily available industry standardandl or information developed for other water systems. The scope of the conservation program is expected to reflect compliance with the minimum required evaluation and implementation of the Conservation Planning Requirements and will be heavily based on, and similar to, the conservation section from the existing Plan. It is expected that this section of the WSP will be produced by replicating the contents of the 2002 plan with onlytrtinor edits to reflect any changed facts since the 2002 plan was written. 5.2 Water Rights Consultant will prepare tabular and text descriptions of the City's water rights. Consultant will format the water rights information and prepare narrative documentation consistent with the requirements of the Municipal Water Law for conformance with place-of-use requirements as specified in RCW 90.03.386. The City will provide clean, reproducible copies of its water rights to Consultant for assistance with this subtask. ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 10 OF 19 1217/2007 5.3 System Reliability Analysis Per the requirements of Chapter 4 of the Planning Handbook, Consultant will assess the reliability of the City's existing source, water rights, and major system facilities. Actions being taken or planned to alleviate any system reliability deficiencies will be described. As part of this task, and in conformance with Chapter 4 of the Planning Handbook, a Water Shortage Response Plan will be included as part of the Plan in much the same form as the 2002 WSP. Water shortage response activities are a subset of emergency response program activities and must be documented as part of the Operation and Maintenance Program (see Task 7). Applicable elements prepared as part of Task 7 will be referenced form the System Reliability Analysis section of the Plan. 5.4 Interties Consultant will prepare a discussion of the City' sexisting interties with the Clallam PUD's water system. The City's agreement governing the use of these intertieswill be included in the Plan as an appendix. If other interties have been developed or are contemplated for development, such as with Black Diamond Water District or Dry Creek Water Association, City staff will prepare brief descriptions of both for review by Consultant prior to inclusion in the Plan. Task 6. Source Water Protection The City delayed preparation of a Watershed CoritrolProgram when the 2002 WSP was prepared as described earlier in this Scope Of Work. In compliance with the DOH Planning Handbook, Consultatlt will prepare a Watershed Control Program consistent with WDOH guidelines for systernswith surface water treatment. The Program will be presented in Section 5 of the WaterSystem Plan. The City williProvide Consultant with electronic GIS mapping files of City's wa.tershed to Be. used inthe preparation of the Watershed Control Program. The draft Watershed Control Program will include: · watershed description and characteristics including geography, physical features, climate, precipitation., weather; · hydrologic characterization of the watershed, including minimum instream flows; · land own.ership and management · agreements and permits affecting the watershed, · identification of land uses and activities detrimental to water quality including natural processes and anthropomorphic vulnerabilities, · watershed management and control measures such as critical area regulation, logging standards, access control, · watershed monitoring activities related to the Clean Water Act, Safe Drinking Water Act and cooperative efforts, and · management system operations including staffing and enforcement. The Watershed Control Program will primarily be comprised of narratives that address the WDOH required elements. Graphics will be incorporated as appropriate to meet WDOH requirements. AITACHMENT 1 TO CH2M HILL AMENDMENT. SCOPE OF WORK PAGE 11 OF 19 12fl/2007 Task 7. Operation and Maintenance Program In conformance with the recommendations of Chapter 6 of the Planning Handbook (paragraph 5 on page 47), the Consultant will prepare an Operations and Maintenance Program based largely on the contents of Section 6 of the 2002 plan. City staff will mark up a hardcopy of the existing Operations and Maintenance Program from the 2002 Plan or revise it electronically for submittal to Consultant. Consultant will update the Operations and Maintenance based on City's revisions and updates. Similar to the Operations and Maintenance Program in the 2002 Plan, the updated Operations and Maintenance Program will include: · Tables and narrative documenting system management and personnel · Comprehensive monitoring plan · Emergency Response Plan · Cross Connection Control Program · Facility Maintenance schedules · Water shortage response plan (see Subtask 5.3) Task 8. Distribution Systel11Facilities Design and Construction Standards Consultant will summarize<thflCity' s design, and construction standards related to the distribution system. In addition, the City's policies regarding outside parties, project review procedures, and construction certification procedures will also be described or referenced to previous sections of the Plan. hi general, this section (Section 7) of the Plan will be the same as the 20021=:1a.nexcept where teviseqand updated by City staff. City staff will mark up a hardcopy oHhe existing Design and ConstIiIction Standards from the 2002 Plan or revise it electronically for submittal to Consultant. Consultant will update the Operations and Mailltenance based on City's revisions and updates. 8.1 Project Review Procedures The City will update the City's process described in the 2002 WSP for reviewing project reports and constr.uction documents with an emphasis on distribution-related projects for which WDOH review is not required. 8.2 Policies and Requirements for Outside Parties The City will summarize the City's policies or requirements for outside parties, such as developers, including right-of-way or pipe-looping requirements, fire flow requirements, level of service standards, and fees, as applicable. Much of this information will be based on the contents of the 2002 WSP and will be updated in consultation with City staff. 8.3 Design Standards (Performance and Sizing) In conformance with the requirements of Chapter 7 of the Planning Handbook, Consultant will incorporate and update the design standards from the 2002 WSP and summarized in Task 4. It is expected that this section of the WSP will be produced by replicating the ATTACHMENT 1 TO CH2M HILLAMENDMENT - SCOPE OF WORK PAGE 12 OF 19 1217/2007 contents of the 2002 plan with only minor edits to reflect any changed facts since the 2002 plan was written. 8.4 Construction Standards (Materials and Methods) The City has standard specifications and detail drawings for the construction of water distribution facilities. The City will furnish its latest standard specifications and detail drawings for inclusion in the Plan as an appendix. 8.5 Construction Certification and Follow-up Procedures The City will summarize the City's procedures related ensuring projects are constructed in accordance with City's construction standards, construction insp.ection, pressure testing, disinfection, water quality sampling, preparation of record drawings, and retention of design and record drawings. The Consultant will update these procedures and include them in the Plan. . It is expected that this sectiOl1of the WSP will be produced by replicating the contents of the 2002 plan with orily minor edits to reflect any changed facts since the 2002 plan was written. Task 9. Improvement Program Consultant will prepare an improvement program in conformance with Chapter 8 of the Planning Handbook. The improvemeIltprograIl} will be preseIltedas a table in Section 8 of the Water System Plan listing system improvemel'1.t.projects identified and described in previous sections of the Plan. Minimal text is anticipatedJor this section of the Plan because discussion of specific improvement projects will be presented in earlier sections. Per WDOH requirements, specific improvemenfprojects over the 6-year planning horizon will be scheduled. The period between the 6-year @d 20-year planning horizons will include improvements that are generally projected for thistime frame, but not scheduled for specific years. Theinlprovementp.rogfamtablewilJ,bedeveloped similar to Table 5 on page 65 of the Planning Handbook, sinillar to the existing Plan, or other format desired by the City. Task>10. Financia.1 Program The City will develop the financial program, with emphasis on the content of the improvement program, in conformance with Chapter 9 of the WDOH Planning Handbook and the requirements of the Municipal Water Law. The level of detail will be similar to the Financial Analysis that was completed in support of Section 9 of the 2002 Water System Plan. At a minimum, to comply with the WDOH's financial program requirements, the financial program will include a summary of the past and present status of the City's water utility. This summary will include: a summary of operating income and expenses for the past 6 years, a current budget, and the City's plan for financing major capital and operational improvements. As part of this task, a discussion of available revenue sources and the allocation of those revenue sources to capital and operational improvements will be presented. A table including the total annual cost of improvements over the 6-year planning horizon will be presented that shows how projected revenue and expenses permit execution of the ATTACHMENT 1 TO CH2M HILLAMENDMENT - SCOPE OF WORK PAGE 13 OF 19 1217/2007 improvement program. A discussion of the need to adjust rates to or obtain other funding to undertake the improvement program will be presented. The City's current and recent water rates, provided by the City, will be presented in a table. A discussion of the utility rate structure to fund improvements directly and/ or revenue bonds to fund improvements indirectly will be developed. Proposed rate increases or changes in rate structure will be shown in the table described above that shows how the improvement program will be funded over the 6-year planning horizon. This discussion will include an assessment of the impact of adjusting rates on conservation efforts. The financial program will also include an evaluation of the City' s rates as required by the WUE rules. In addition, the financial implications of pursuing reclaimed water will be assessed and incorporated into Task 5 as required bytheWUE rules. Task 11. Miscellaneous Documents The Plan will be appended with miscellaneous detailed information and documents that are not included in the main sections of the Plan. Theserniscellaneous documents include, but are not limited to: · The required State Environmental Policy Act (SEPA) Checklist · Water rights documentation . Service area and intertie agreements · The detailed results of the hydraulic modelip.g task · Wholesale water agreements arid. contracts . Service area agreements · Design anclc::onstruction Standards ( drawings and specifications) · Current Water Facilities Inventory Form · Water System History . Description of Adjacent Water Systems · Port AngelesJV1unicipalCode Sections related to Water Service and Zoning · Water Quality RegulationsSummary Emergency Supply Overview · Sununary of City's Industrial Supply System . Fire Flow Modeling results · Water Shortage Response Plan · Job Descriptions for key personnel · Emergency Response Plan · Cross Connection Control Program · Construction Standards Task 12. Executive Summary Consultant will prepare a brief executive summary up to three pages in length, including (as applicable) tables and graphs extracted from the body of the WSP, for inclusion as part of the Plan (bound at the front of the Plan). No maps or other figures will be prepared as part of the Executive Summary. The focus of the Executive Summary will be those elements of the Plan the City wishes to emphasize. These are expected to include, but not be limited to, ATIACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 14 OF 19 1217/2007 water utility policies, population and demand forecasting, the results of the hydraulic modeling task, key elements of the improvement program, compliance with the MWL, and the financial program. Task 13. Hydraulic Modeling As stated previously, the major part of the assessment of the distribution system will be the development and use of a hydraulic model of the City's system to evaluate its capacity to meet fire flow and system pressure criteria as well as identify needed distribution system improvements. Consultant will prepare a hydraulic model usmg MWH Soft's Info Water hydraulic modeling software program, which the City may sUQsequently purchase to undertake its own modeling efforts in the future. InfoWater USes EP ANet as a hydraulic engine, which is a standard within the water utility industry. The City and Consultant acknowledge that the primary end result of this modeling activity is to undertake a comprehensive modeling effort to be summarized in the)f'lan that identifies deficiencies and describes recomm.endedimprovements. A secondary objective is to develop City expertise in use of the model to enable .itto update the model when necessary and undertake future modeling efforts with iiSown staff. 13.1 Hydraulic Model Network Construction This task involves converting the watersysterninfqrmation contained in the City's GIS into a hydraulic model network The model will be constructed to mc1ude all pipes with the exception of service and hyqrant laterals. COl1Sultant wiUmaintain a one-to-one relationship between the pipe and node identifiers in the GIS and those in the hydraulic model, if such identifiers exist in the GIS. This relationship maintenance will facilitate updating of the modelin the future. The City will provide topographyinformationil'l electronic format either as part of the GIS or otherwise. It is assumed that the City's GIS is current with respect to information on pipe diameter, length, age/and material. It is also assumed that the City's GIS contains accurate netWork connectivity regarding where pipes intersect and overlap. Whether or not there are such inaccuracies in the City's GIS will not be revealed until modeling calibration efforts begin. Consultant time for minor corrections to the GIS-provided data are included as part of this subtask .Jf more substantial corrections are necessary, the budget for this subtask will need to be modified. Additional informatiollon system facilities will be provided by the City and incorporated into the model by the Consultant. This information includes but is not limited to, pump curves, valve settings, and reservoir dimensions. The City will be responsible for providing all GIS and water-system-specific data for incorporation into the model. Consultant will perform a QA/ QC analysis on the GIS information to identify inconsistencies, conflicts, and insufficiencies. The City will provide the necessary information per Consultant's QA/QC analysis. No Consultant time is budgeted for filling these data gaps. ATTACHMENT 1 TO CH2M HILLAMENDMENT - SCOPE OF WORK PAGE 15 OF 19 121712007 13.2 Billing Records Reduction and Demand Allocation Consultant will reduce billing records to an average daily demand per meter. Consultant will link the parcel information to a physical location and allocate to pre-defined demand nodes within the model based on proximity and pressure zone boundaries. Consultant will modify the pre-defined demand nodes to include unaccounted water use by escalating them by the appropriate percentages developed as part of Task 3. Maximum daily demand and peak hour demand used in the model will be based on demand ratios developed in Task 3. Each parcel will be linked electronically to a single model node, which will facilitate future model updating. The City will provide billing records for two full calendar years in a standard database format. The City will ensure that the billing records include a linkage to a spatial coordinate through a parcel identifier or customer meter locati6l.'l.. Aminimurrrof 75% of the billing records should have a physical location in ordertouse this allocation methodology. If this criterion cannot be met, the City will be consulted to determine an acceptable alternative for allocating demand based on land use, traffic analysis zones,meter routes, Orc~nsus data. Alternative demand allocation methodologies or significant problems with the billing data could require adjustments to the project schedule andbttdget. 13.3 Field Data Collection and Calibration Consultant will perform a steady state calibration analysis. The calibration will compare field pressures and flows with those produced by the hydraulic model. The number and location of pressure and flow. measurements will be identified through correspondence with City staff concerning pressure zone delineation, problem areas, and future growth. Hydrant flow tests will notexc:eed 16 locations. Consultant will develop a field calibration plan prior to field-testing. It is assumed that City staff will perform all pressure and flow measurements in the system usihgcalibrated gauges. Collection of boundary condition information during the pressure and flowJests is critical to accurate calibration. Boundary conditions consist 6fflow meters.on all sources and booster pump stations as well as reservoir levels. Supervisory Control and Data Acquisition (SCADA) information will be used if.available. City staffwill collect the pressure, flow, and boundary condition information,and reduce it into a readily usable spreadsheet format for delivery to the Consultant. This field calibra.tion effortis expected to take a total of one week. A subconsultant will be used to perform the hydrant flow tests and the consultant will provide a staff person for the duration of this activity. Consultant will compare field pressure and flow data with those predicted by the model. Consultant will calibrate field and model pressures to within an overall average of 5 percent difference. Consultant will calibrate field and model flows to within an overall average of 10 percent difference. Calibration is an iterative process that may require modification to friction factors, valve settings, and demand allocation to achieve the desired levels of agreement. Consultant will undertake this iterative process to produce the calibrated model. Consultant will provide a summary table of calibration results and will identify any system modifications done during calibration. ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 16 OF 19 12/7/2007 13.4 Modeling Runs Consultant will undertake multiple modeling runs using 6-year (2014) and 20-year (2028) demand projections. The following basic scenarios will be evaluated under existing and future conditions: Average Day Demand (ADD), Maximum Daily Demand (MDD), Peak Hour Demand (PHD), Reservoir Refill (RR), and Fire Flow. The goal of these analyses will be to ensure water can be provided to customers under acceptable and required pressure and flow criteria. Where those criteria cannot be met, improvements will be identified that address deficiencies. Fire flow modeling will form the bulk of the modeling run activity. The hydraulic model enables the batch analysis of multiple fire flow locations,. Approximately 50 separate fire flow evaluations are anticipated at key locations throughout the system. The actual fire flows to be simulated for residential and non-residential development must be provided by the City, with guidance-input from Consultant. Consultant will prepare a map showing the location and value of each of the fire flows simulated for inclusion in the Plan. The results of tllemodeling runs will be presented in a table. The results will also be displayed on a color-c()dedmap of the systemto show the spatial distribution of fire flow deficiencies. The result$will be prioritized based on several criteria including: available fire flow,itheIlllmber of residential customers affected, the type of development affected (i.e. schools, hospitals, and nursing homes will have high priority), and other criteria to be developed in consultatioru,vith City staff. A significant element of this task will be tddevelop improvements to alleviate identified deficiencies. These improvements will be developed through a series of modeling runs that will involve the insertion of pipeline improvements (pipeline replacements and additional pipelines for system looping). Changes in PRVsettings may also be considered in the improvements. Consultant will dgvelop a separate table summarizing the distribution system improvements. This table will be correlated with the table displaying prioritized results of the hydraulic modeling, Prioritization of proposed projects will be done via an iterative process by firstapplyingithe City's adopted codes, requirements and policies to the list of potential projects, ranking theIn, and then reviewing them via phone conference with City staff. In addition, Consultant will develop a map, or series of maps, presenting the location of improvements... Consultant will prepare supporting text description to accurately describe the nature and needior each improvement. The prioritized list of system improvements can be used by the City to select specific future projects in conjunction with other improvement activities such as street repairs. In addition, modeling runs using current average daily demands (ADD), MDD, and PHD will be used to identify existing areas where system pressure is less than 30 psi or greater than 80 psi (WDOH requirements). Pipe segments with excessive velocity (>8 feet per second) will also be identified. Consultant will display these areas on maps for each of these domestic demand scenarios. Consultant will prepare a discussion of the activities, objectives, and procedures of this modeling and improvement-development task for inclusion in the Plan. ATTACHMENT 1 TO CH2M HILLAMENDMENT - SCOPE OF WORK PAGE 17 OF 19 1217/2007 13.5 Documentation of Model Development, Calibration, and Results Consultant will prepare a brief summary for inclusion in the Plan of how the model was developed, calibrated, and related to the City's GIS database, per the activities undertaken as part of Subtasks 13.1 through 13.3. This summary will be particularly helpful in the event that future changes in City staff occur that reduce the first hand experience the City will have with the actual development and operation of the model. Also as part of this subtask, Consultant will present the results of the hydraulic modeling task, Subtask 13.4. The results will include distribution system improvements. The summary of identified distribution system improvements will be referenced from the presentations developed as part of Sub tasks 4.4 and 4.5. Task 14. Document Preparation and.Reviews Consultant will prepare two draft versions of the Plan and a single finaly~rsion of the Plan. The cost of preparing these draft and final versions is substantial. Thus, if adgitional draft versions become necessary or requested by the CIty, the budget for this task will need to be amended. 14.1 Preliminary Draft Consultant will prepare a preliminary draffof the Plan for sl1.bnrittal to the City for its review. The preliminary draft is intendeR- for inte.'I'Ila1 review by City staff and not for distribution to other agencies. Six copies of thepieliminary draft will be prepared and subnritted by Consultantt()the City. City staff will coordina.te, adjudicate, and summarize all City comments onto a single Plan set edited in red ink or red pencil for subnrittal to Consultant. Consultant will meet once with City staff to review comments and agree on appropriate responses and revisions. 14.2 Revision of Preliminary Draft Consultant will revise the preliminary draft Plan as necessary and appropriate based on comments provided by City staff. 14.3 Final Draft Consultant will prepare 15 bound copies of a revised, "final draft" Plan, incorporating the City's preliminary draft comments, for re-subnrittal to the City for an additional final review. The City willsubnrit the final draft Plan to WDOH, Clallam County Health Department, ClallamPUD, and other applicable agencies and stakeholders for their review. City staff will coordinate, adjudicate, and summarize all City, County, and other agency (excluding WDOH) comments onto a single Plan set edited in red ink or red pencil. Consultant will address review comments with City staff by telephone conference call. 14.4 Revision of Final Draft Consultant will revise the final draft Plan based on City-adjudicated comments and WDOH comments, as necessary and appropriate, in preparation of the final Plan to be adopted by the City. ATTACHMENT 1 TO CH2M HILL AMENDMENT - SCOPE OF WORK PAGE 18 OF 19 12f712007 14.5 Final Plan Consultant will convert all WSP chapters, documents and figures into digital PDF format with indexing and links for ease of use by City staff and others. This activity is not the task of simply copying files onto CD but involves the creation of an electronic version of the water system plan with hyperlinks and an organizational format that will be intuitive and fully functional. 1. Create hyperlinks in the table of contents and all plan chapters created by Consultant for linking to chapters, figures and appendices. 2. Set up properties information for all Microsoft Word files and convert to Adobe PDF files. 3. Scan appendices that are not available in electronic format aIldconvert to Adobe PDF files. 4. Convert all figures available in electronic format to Adobe PDF file1i.W ater system figures will have zoom capabilities that enable users to zoom into thePDF figures for viewing of detailed information. 5. Organize and combine PDF files into appropriate sections of the plan. 6. Create bookmarks to enable easy navigation between all sections of the plan, following the same organizational format as the printed plan. 7. Review organizational structure andtestall chapters, appendices, figures and hyperlinks. 8. Copy the completed electronic plan to Compact Pisks (CDs) for use by the City and distribution. Create, print, and apply labelstb CDs. Feedestimate is based on creating 10 CDs for the City. Task 15. ProjectMeetings Throughout the course of the Plan development, it will be beneficial for Consultant to attend project meetings ill Port Angeles. These meetings are not budgeted as part specific Plansubtasks, but instead are budgeted separately as part of this subtask. The budget for this subta.sk is based on a total of 6 meetings in Port Angeles, attended by a single Consultant staff person, throughout the course of Plan development as determined necessary by the City. In addition, the kick~off meeting/WDOH scoping meeting will also be attended by Consultant. Consultant's project manager and project engineer/planner will attend the kick~off meeting. Task 16. Project Accounting and Invoices Consultant will set up internal accounting files and project numbers. Consultant will prepare internal project instructions and internal quality control plan and distribute these two project staff and applicable functional leadership team members. Consultant's project manager will coordinate and review work activities of the project team. Consultant will prepare and submit invoices to the City on a monthly basis. Consultant will accompany invoice with a brief status report of one-page or less. ATTACHMENT 1 TO CH2M HILLAMENDMENT - SCOPE OF WORK PAGE 19 OF 19 ~ORTANGELES WAS H I N G TON, U. S. A. Utility Advisory Committee Memo Date: December 11, 2007 To: Utility Advisory Committee From: Scott McLain, Deputy Director for Power Systems Subject: UAC Term Limit Discussion Summary: Limits of two consecutive terms are imposed for all ofthe citizen members of the UAC. Staffwould like to bring this issue forward for discussion at UAC. Recommendation: Forward a favorable recommendation to City Council to amend the ordinance to no longer limit the citizen member of the UAC representing the industrial customers to two consecutive terms. Background/Analysis: Citizen members of the Utility Advisory Committee representing the industrial customers are chosen both by recommendation of the industrial customer group and City Council's Rules of Procedure. In view ofthe fact that there is only one industrial electrical customer in Port Angeles, Nippon Papers Industries America, it is recommended that the P AMC be amended to eliminate term limits for the industrial representative. It is recommended that the UAC make a favorable recommendation to Council to amend the ordinance to reflect that the industrial representative shall not have term limits. N:\UAC\Final\UAC term limit.doc