Advanced Metering Infrastructure
City of Port Angeles Electric Meter Inventory
100%
System Meter Radio-Frequency
90%
Emissions Update
63% of all meters remain
80%
more than 20 years old
70%
Cumulative Relative Frequency
60%
Port Angeles Utility Advisory Committee
October 8, 2013
50%
40%
Philip D. Lusk
30%
Deputy Director of Power &
20%
Telecommunications Systems
10%
360.417.4703
0%
plusk@cityofpa.us
Date Meter Manufactured
Situation AnalysisRF-EMF?
•Between 2004 and 2009, traditional analog
•RF-EMF
electric meter production in the U.S. gradually
•Radio Frequency Electromagnetic Field
shut down as electronic digital meters were
•Frequencies from 50 MHz to 3.5 GHz
introduced
•Measured as Power Density
“This transition was the most significant change in
–Microwatts/square meter or centimeter (µW/mor µW/cm)
•
22
metering technology in over 100 years.”
–Decibels/milliwatt(dBm)
•Smart meter RF-EMF has been measured
•The City’s smart meters are operating at levels about
500,000 lower than the current federal threshold
What Levels of RF-EMF will Smart
Meters Add to the Environment?
•Smart meters use wireless signals in the 900
MHz range that are similar to:
•Cordless phones, cellphones, wireless routers and
laptops, baby monitors, microwave ovens, radios and
televisions, pagers, garage-door openers, touch
lamps, and walkie-talkies
1
10/9/2013
What Levels of RF-EMF will Smart
What Levels of RF-EMF will Smart
Meters Add to the Environment?
Meters Add to the Environment?
•Very low RF-EMF field levels were measured
•Transmitter output power is very low
•Highest electric meter
•Signal level decreases substantially with meter
•300 at 9”
µW/m
2
distance (“Inverse-Square Law”)
•75 at 18”
µW/m
2
Specifically, if you double the distance from the
•
•19 at 36”
µW/m
2
source, the intensity will decrease to 25% of its
Representative Phase 1 activated meter
•
original amount (1/2=1/4).
2
•20 at 9”
µW/m
2
•5 at 18”
µW/m
2
•1 at 36”
µW/m
2
•What does this mean in terms of ensuring safety?
International RF-EMF Exposure Limits
Smart Meter RF-EMF Summary
(1800 MHz Range)
2
LOCATIONREFERENCEBASED ONµW/mLOWER BY
•Smart meters are measured operating at levels
about 500,000 lower than US, Canadian and most
CanadaSaftey Code 6, Table 5Thermal / Heating10,000,000-
of Western Europe’s thermal standards
USAFCCThermal / Heating10,000,000-
•The emissions are 5,000 times lower than the biological
IEEE C95.1-1999 and International
Most of Western EuropeThermal / Heating10,000,000-
Commission on Non-Ionizing
standards used by Russia, China, Italy and most of
Radiation Protection (ICNIRP)
Sanitary Norms and Regulations
Eastern Europe
RussiaBiological100,000100x
2.2.4/2.1.8.055-96
•The emissions are also 5,000 times lower than the
ChinaUDC 614.898.5 GB 9175-88Biological100,000100x
precautionary standard used by Switzerland
Sanitary Norms and Regulations
ItalyBiological100,000100x
2.2.4/2.1.8.055-96
Sanitary Norms and Regulations
Most of Eastern EuropeBiological100,000100x
2.2.4/2.1.8.055-96
National Research Programme
SwitzerlandPrecautionary100,000100x
"Non-Ionising Radiation - Health
and Environment" (NRP 57)
20
City of Port AngelesElectric Smart MetersTesting500,000x
2
10/9/2013
SOURCE: http://www.naperville.il.us/emplibrary/Smart_Grid/NSGI-HealthSafety-ExposureLevels-lg.jpg
3
Discussion Outline
City of Port Angeles
Utility AdvisoryOverview of rate study process
Committee Meeting
Key factors
Summaries
Utility Cost of Service Studies
Transfer Station
Collection
Water
October 8, 2013
Wastewater
Combined Sewer Overflow (CSO)
•
Electric
Questions
Next Steps
Variable
Page 1Page 2
Overview of the Study ProcessKey Factors
Study period 2014-2016 (carried through 2019)
Projected rate revenue based on 2012 actual data
FISCAL POLICIES
Step 1:
ECONOMIC
2013 budget used as baseline –escalation factor
ASSUMPTIONS
Revenue
Requirement
CAPITAL FUNDING OPERATING
REVENUE REQUIREMENT
BUDGETS
PLAN
applied for future years:
CUSTOMER
STATISTICS
General: 3.0% per year
CLASSIFY COST BY FUNCTION
Labor: 2.0% per year
PERS: 9.2% per year
WASTEWATER
TRANSFER STATIONWATER
Step 2: Cost
of Service CSO
Medical: 0.0% 2014, 5.0% per year thereafter
COLLECTIONELECTRIC
Incorporated utility specific fiscal policies
ALLOCATE COSTS TO CUSTOMER
CLASSES
Reserves
Annual system replacement funding
VARIABLE
RATE DESIGN
FIXED CHARGES
CHARGES
Step 3: Rate
Debt service coverage
Design
Page 3Page 4
Key DriversAverage Residential Bill Impacts
UtilityExisting201420152016
Transfer Station
Solid Waste Collection$ 27.15$ 28.75$ 30.09$ 31.66
$19.5 million Land Bluff Stabilization project
Water 36.11 38.10 40.10 42.20
Collection
Wastewater 44.30 48.80 53.50 57.58
Wastewater - HSM 4.50 4.50 4.50 -
Transfer station cost increases
Wastewater - CSO 20.10 20.10 20.10 20.10
Water
Electric 98.01 104.38 111.17 117.56
Medic I 5.12 5.43 5.43 5.43
Reduced consumption
Total$ 235.29$ 250.06$ 264.89$ 274.53
Wastewater Monthly Increase$ 14.77 $ 14.83 $ 9.64
Percent Increase6.28%5.93%3.64%
Capital needs and reduced consumption
Notes:
Rate adjustments may occur in 2015 and 2016
Electric
Rates shown exclude utility tax; no utility tax changes proposed
Bonneville Power Administration
Solid Waste Collection - Includes EOW pickup and yard waste
Water - Residential 5/8" meter with 450cf per month
Wastewater - Residential > 430cf per month
Variable
Electric - Residential with 1,300 kWh per month
Page 5Page 6
1
TS Revenue Requirement Summary
$9,000,000
6.10%
14.65%
$8,000,000
19.00%
$7,000,000
$6,000,000
$5,000,000
$4,000,000
$3,000,000
TRANSFER STATION OPERATIONS
$2,000,000
$1,000,000
COST OF SERVICE
$0
2013201420152016
Cash Operating ExpensesContractual
New Debt ServiceAdditions to Meet Coverage
Post Closure Reserve TransfersTotal Existing Revenue
Total Revenue After Increase
Reduction in tonnage is driving down revenues
New debt service for $19.5 million post closure Land Bluff Stabilization project
Growth in existing O&M and contract costs
Debt service coverage requirements
Variable
Page 7Page 8
TS Cost of Service & Proposed RatesTS Considerations/Issues
Rate Increases201420152016
Land Bluff Stabilization Cost
Proposed Increases19.00%14.65%6.10%
$4.0 million DOE contribution
2014 2015 2016
CategoryExisting2014 COSA
ProposedProposedProposed
$15.5 million revenue bond (25-year term, 4.6% interest, first
Tax Exempt Transfer Station
5-year interest only)
Municipal Solid Waste$ 116.10$ 119.44$ 139.13$ 159.73$ 169.49
Yard Waste 27.70 74.93 29.09 30.54 32.07
City taxes associated with new debt paid by general fund
Biosolids 50.85 74.06 74.06 85.03 90.23
Self-Haul
$59,000 increasing to $135,000
•
Municipal Solid Waste 141.95 218.15 170.11 195.29 207.23
$637,000 in transfers to post-closure fund to
Tires 141.95 306.65 170.11 195.29 207.23
Asbestos 394.40 447.24 447.24 513.44 544.84
meet ending balance requirements
Contaminated Soils 207.30 237.76 237.76 272.96 289.66
Yard Waste 44.95 174.16 47.20 49.56 52.04
Metals and White Goods 68.85 127.74 72.29 75.91 79.70
Blue Mountain 237.40 225.59 237.40 272.54 289.21
Note:
Minimum fee applies to Self-Haul Customers
Proposed unit costs are based on a phase-in strategy
Variable
Page 9Page 10
Collection Revenue Requirement Summary
$4,500,000
5.60%
5.60%
5.60%
$4,000,000
$3,500,000
$3,000,000
$2,500,000
$2,000,000
$1,500,000
COLLECTION OPERATIONS
$1,000,000
$500,000
$0
COST OF SERVICE
2013201420152016
Cash Operating ExpensesAdministrative
Contractual (Yard/Recycling)Disposal
Total Existing RevenueTotal Revenue After Increase
Revenue not sufficient to meet projected needs
Disposal cost increases from the Transfer Station utility along with
general and Contractual cost increases causing rate pressure
Fund balance allows use of $725,000 in 2014 through 2016 to phase-in
Variable
rate increases
Page 11Page 12
2
Collection Cost of Service &
Collection Considerations/Issues
Proposed Rates
Reserve used to keep rates down
$725,000 2014-2016
Rate Increases201420152016
Balance still above target
Proposed Increases5.60%5.60%5.60%
Every 1.0% of increase = $33,000
2014 2015 2016
Weekly service change
CategoryExisting2014 COSA
ProposedProposedProposed
Residential - Weekly$ 30.65 $ 30.45 $ 32.17 $ 34.28 $ 36.26
2% reduction in residential weekly service
Residential - Every Other Week 19.75 22.03 20.35 21.36 22.60
Residential - Yard Waste 7.40 8.42 8.40 8.72 9.06 2% increase in every other week service
Commercial - 90 gallon 22.60 33.80 26.89 29.84 33.10
Commercial - 300 gallon 78.15 74.59 81.51 85.10 88.85
Schools Recycling 13.05 5.46 13.05 13.05 13.05
Note:
Proposed unit costs are based on a phase-in strategy
Variable
Page 13Page 14
Water Revenue Requirement Summary
$7,000,000
5.25%
5.25%
5.50%
$6,000,000
$5,000,000
$4,000,000
$3,000,000
WATER
$2,000,000
$1,000,000
COST OF SERVICE
$-
2013201420152016
Cash Operating ExpensesExisting Debt Service
Rate Funded System ReinvestmentTotal Existing Revenue
Total Revenue After Rate Increase
Currently revenue does not cover expenses
Expenses have increased faster than revenues
Phasing in system reinvestment
Variable
Page 15Page 16
Water Cost of Service FindingsWater Proposed Rates
Across the Board 2014 RevenueCOSA 2014 Revenue
Rate Increases201420152016
Commercial
Irrigation Irrigation,
Proposed Increases5.50%5.25%5.25%
Commercial / Municipal
$0.1M
$0.3M
/ Municipal $1.6M
3%
6%
$1.4M
32%
2014 2015 2016
Sample BillsExisting
29%
ProposedProposedProposed
Residential
Fixed$ 26.75 $ 28.22 $ 29.70 $ 31.26
Volume (450 CF) 9.36 9.87 10.39 10.94
Total$ 36.11$ 38.09$ 40.09$ 42.20
Increase$ 1.98$ 2.00$ 2.11
Commercial/Municipal
Residential
Residential
Fixed$ 37.90 $ 39.98 $ 42.08 $ 44.29
$3.1M
$3.4M
Volume (730 CF) 12.70 13.40 14.10 14.84
62%
68%
Total$ 50.60$ 53.38$ 56.18$ 59.13
Increase$ 2.78$ 2.80$ 2.95
Proposed
Existing COSA $
Class%
2014 2014 Difference
Irrigation
201420152016
Fixed$ 32.60 $ 34.39 $ 36.20 $ 38.10
Residential$ 3,208,851$ 3,078,941$ (129,910)-4.05%5.50%5.25%5.25%
Volume (3,000 CF) 55.80 58.87 61.96 65.21
Commercial / Municipal 1,372,763 1,606,501 233,73817.03%5.50%5.25%5.25%
Total$ 88.40$ 93.26$ 98.16$ 103.31
Irrigation 139,974 295,834 155,860111.35%5.50%5.25%5.25%
Increase$ 4.86$ 4.90$ 5.15
Total$4,721,588 $4,981,276 $ 259,6885.50%5.50%5.25%5.25%
Note: Fixed rates shown are for 5/8" meter and would increase with meter size
Page 17Page 18
3
Water Considerations/Issues
Recapitalization/system reinvestment
Base case $80,000 -$400,000
Annual depreciation = $1.4 million
Every 1.0% rate impact = $50,000
WASTEWATER
Cost of service differentials identified
Swings from 2008 study due to changes in demand
COST OF SERVICE
Recent demand history atypical
Equal adjustment to all classes and rates
VariableVariable
Page 19Page 20
Wastewater Revenue Requirement
Wastewater Cost of Service Findings
Summary
Across the Board 2014 RevenueCOSA 2014 Revenue
$7,000,000
9.00%
11.00%
11.50%
Commercial /
$6,000,000
Commercial
Municipal
/ Municipal
$1.4M
$5,000,000
$1.6M
29%
32%
$4,000,000
$3,000,000
$2,000,000
$1,000,000
$-
2013201420152016
Residential
Residential
Cash Operating ExpensesNew & Existing Debt Service
$3.1M
$3.4M
Rate Funded System ReinvestmentTotal Existing Revenue
62%
68%
Total Revenue After Rate Increase
Proposed
Currently revenue does not cover expenses Existing COSA $
Class%
2014 2014 Difference
201420152016
Expenses have increased faster than revenues
Residential$ 3,280,867$ 3,234,047$ (46,820)-1.43%10.15%9.63%7.64%
Phasing in system reinvestment
Commercial/City/LEKT 1,030,411 1,573,027 542,61652.66%15.79%15.18%12.97%
Excludes costs associated with the Harbor Study Mandate (HSM), which are
Total$4,311,278 $4,807,074 $ 495,79611.50%11.50%11.00%9.00%
funded by a separate surcharge (effective until July 2015)
Page 21Page 22
CSO Revenue Requirement SummaryProposed Total Wastewater Rates
COSA Rate Adjustments201420152016
$2,500,000 Residential10.15%9.63%7.64%
Non-Residential15.79%15.18%12.97%
0.00%0.00%0.00%
2014 2015 2016
$2,000,000
Existing
ProposedProposedProposed
Residential < 430 CF
$1,500,000
General$ 39.90 $ 43.95 $ 48.18 $ 51.86
CSO 18.00 18.00 18.00 18.00
HSM 4.10 4.10 4.10 -
$1,000,000
Total$ 62.00$ 66.05$ 70.28$ 69.86
Increase$ 4.05$ 4.23$ (0.42)
Residential > 430 CF
$500,000
General$ 44.30 $ 48.80 $ 53.50 $ 57.59
CSO 18.00 18.00 18.00 18.00
$-HSM 4.10 4.10 4.10 -
2013201420152016
Total$ 66.40$ 70.90$ 75.60$ 75.59
Increase$ 4.50$ 4.70$ (0.01)
Non-Residential
New & Existing Debt ServiceTotal Existing RevenueTotal Revenue After Rate Increase
Base Charge
General$ 11.20 $ 12.97 $ 14.94 $ 16.88
CSO 4.70 4.70 4.70 4.70
HSM 1.15 1.15 1.15 -
Volume Charge (730 CF)
No rate change through 2016
General 23.29 26.97 31.06 35.09
Phase II CSO debt service in 2017 (PWTF or SRF loan)
CSO 11.75 11.75 11.75 11.75
HSM 2.56 2.56 2.56 -
Total$ 54.65$ 60.10$ 66.16$ 68.42
Increase$ 5.45$ 6.06$ 2.26
Page 23Page 24
4
Wastewater Considerations/Issues
Recapitalization/system reinvestment
Base case $0 -$200,000
Annual depreciation = $1.7 million
Every 1.0% rate impact = $50,000
ELECTRIC
Cost of service differentials identified
Trends similar to 2008 study
COST OF SERVICE
Begin phasing in cost of service over time
VariableVariable
Page 25Page 26
Electric Revenue Requirement SummaryProposed Electric Rates/ Impacts
5.75%
25,000,000
6.50%
Proposed Phase-In
6.50%
ClassExisting
0.00%
201420152016
20,000,000
Residential (1,300kWh)
Fixed$ 15.75$ 16.77$ 17.86$ 18.89
15,000,000
kWh 82.26 87.61 93.30 98.67
Total$ 98.01$ 104.38$ 111.16$ 117.56
10,000,000
$ Difference$ 6.37$ 6.78$ 6.40
5,000,000
General Service (Single Ph., 2,300kWh)$ 167.78$ 178.68$ 190.29$ 201.23
$ Difference$ 10.90$ 11.61$ 10.94
-
G.S. - Demand (Multi Ph., 25,000kWh, 98kW)$ 1,532.04$ 1,632.01$ 1,737.90$ 1,838.13
2013201420152016
$ Difference$ 99.97$ 105.89$ 100.23
Cash Operating ExpensesPower
G.S. - Demand Primary (Multi Ph., 145,000kWh, 568kW)$ 8,225.95$ 8,757.86$ 9,327.67$ 9,861.05
Existing Debt ServiceRate Funded System Reinvestment
$ Difference$ 531.91$ 569.81$ 533.38
Reserve FundingTotal Existing Revenues
Primary (600,000kWh, 1,494kW)$ 32,751.13 $ 34,877.12 $ 37,142.20 $ 39,274.24
Total Revenue After Increase
$ Difference$ 2,125.99$ 2,265.08$ 2,132.04
: Comparison does not include costs or revenues associated with Industrial Transmission.
Note
Municipal Water Pumping (97,000kWh, 532kW)$ 7,674.06$ 8,174.74$ 8,704.26$ 9,205.98
$ Difference$ 500.68$ 529.52$ 501.72
Increases in BPA wholesale power costs
Loads are flat through the forecast period, while expenses are increasing
Nonprofit (Single Ph., 5,000kWh)$ 366.00$ 389.80$ 415.14$ 438.99
$ Difference$ 23.80$ 25.34$ 23.85
Reserve levels
Phasing-in rate funded system reinvestment
Cost of service differentials identified
Page 27Page 28
Electric Considerations/Issues
Recapitalization/system reinvestment
Currently at annual depreciation = $1.22-$1.35 million
Every 1.0% rate impact = $188,000
Cost of service differentials identified
Combined Residential
Proposed across the board implementation for 2014
Bill Impacts
Review of cost of service phase-in during 2014 for 2015
rate period
VariableVariable
Page 29Page 30
5
Average Residential Bill Impacts2014 Impact by Utility
Medic I, $0.31
Solid Waste
, 2%
Collection,
UtilityExisting201420152016
$1.60 , 11%
Solid Waste Collection$ 27.15$ 28.75$ 30.09$ 31.66
Water, $1.99 ,
Water 36.11 38.10 40.10 42.20
14%
Wastewater 44.30 48.80 53.50 57.58
Electric, $6.37
, 43%
Wastewater - HSM 4.50 4.50 4.50 -
Wastewater - CSO 20.10 20.10 20.10 20.10
Electric 98.01 104.38 111.17 117.56
Medic I 5.12 5.43 5.43 5.43
Wastewater,
Total$ 235.29$ 250.06$ 264.89$ 274.53
$4.50 , 30%
Monthly Increase$ 14.77 $ 14.83 $ 9.64
Wastewater -
Wastewater -
CSO, $-, 0%
Percent Increase6.28%5.93%3.64%
HSM, $-, 0%
Notes:
2014Total Monthly Utility Bill Increase: $14.77
Rate adjustments may occur in 2015 and 2016
CategoryElectricCollectionWaterSewerMedic 1Total
Rates shown exclude utility tax; no utility tax changes proposed
O&M$ 1.89 $ 0.30 $ 1.02 $ 2.80 $ 0.31 $ 6.32
Solid Waste Collection - Includes EOW pickup and yard waste
Power/Contractual 2.54 1.30 - - - 3.84
Water - Residential 5/8" meter with 450cf per month
Capital - Total Debt - - 0.05 1.70 - 1.75
Wastewater - Residential > 430cf per month
Capital - Reinvestment 1.94 - 0.92 - - 2.86
Total$ 6.37$ 1.60$ 1.99$ 4.50$ 0.31$ 14.77
Electric - Residential with 1,300 kWh per month
Page 31Page 32
Alternative1: Full R&R Funding in Alternative2: No R&R Funding in
(2014-2016)
(2014-2016)
UtilityExisting201420152016UtilityExisting201420152016
Solid Waste Collection$ 27.15$ 28.75$ 30.09$ 31.66Solid Waste Collection$ 27.15$ 28.75$ 30.09$ 31.66
Water 36.11 40.44 45.30 50.73 Water 36.11 37.19 38.31 39.46
Wastewater 44.30 64.55 71.40 72.10 Wastewater 44.30 48.80 53.50 56.92
Wastewater - HSM 4.50 4.50 4.50 -Wastewater - HSM 4.50 4.50 4.50 -
Wastewater - CSO 20.10 20.10 20.10 20.10 Wastewater - CSO 20.10 20.10 20.10 20.10
Electric 98.01 104.38 111.17 117.56Electric 98.01 102.91 107.29 111.85
Medic I 5.12 5.43 5.43 5.43Medic I 5.12 5.43 5.43 5.43
Total$ 235.29$ 247.68$ 259.22$ 265.42
Total$ 235.29$ 268.15$ 287.99$ 297.58
Monthly Increase$ 12.39 $ 11.54 $ 6.20
Monthly Increase$ 32.86 $ 19.84 $ 9.59
Percent Increase5.27%4.66%2.39%
Percent Increase13.97%7.40%3.33%
Notes:Notes:
Would need to shift/cut CIP
Rate adjustments may occur in 2015 and 2016
Rate adjustments may occur in 2015 and 2016
in 2014-2016
Rates shown exclude utility tax; no utility tax changes proposedRates shown exclude utility tax; no utility tax changes proposed
1.Electric: $2.9 million
2.Wastewater: $500,000
Solid Waste Collection - Includes EOW pickup and yard waste
Solid Waste Collection - Includes EOW pickup and yard waste
Water - Residential 5/8" meter with 450cf per month
Water - Residential 5/8" meter with 450cf per month
Wastewater - Residential > 430cf per month
Wastewater - Residential > 430cf per month
Electric - Residential with 1,300 kWh per month
Electric - Residential with 1,300 kWh per month
Page 33Page 34
Next Steps
Rate Hearing October 15
Second Reading and Adoption November 5
Rates effective January 1, 2014