Loading...
HomeMy WebLinkAbout000092 Amendment (5) FZ�.uc>rcl a000092 AMENDMENT NO. 5 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE CITY OF PORT ANGELES AND STUDIO CASCADE, INC PROJECT WTIP THIS AMENDMENT NO. 5 is made and entered into this day of March, 2014, by and between the City of Port Angeles, a non-charter code city of the State of Washington, (hereinafter called the "CITY") and Studio, Cascade Inc., a Washington Corporation (hereinafter called the "CONSULTANT"). WHEREAS, the CITY and the CONSULTANT entered into an Agreement on May 5, 2011 for design of the Waterfront Transportation Improvements ("AGREEMENT"); and WHEREAS, the CITY and the CONSULTANT now wish to amend the scope of work and budget of that AGREEMENT; and WHEREAS, this amendment to the AGREEMENT satisfies the criteria of Port Angeles Municipal Code 3.05.110; NOW, THEREFORE, in consideration of the representations and the terms, conditions, covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the parties hereto agree as follows: SECTION 1 The CITY entered into an AGREEMENT with the CONSULTANT on May 11, 2011 (the AGREEMENT). SECTION 2 I. REVISED SCOPE OF WORK Exhibit A is amended to add the following additional work to Item 6: The West End Park design process is essentially complete, except for a final set of revisions to respond to agency comments and a change in trail width from 10' to 12' with 2' shoulders on either side. This Addendum 5 includes an allowance for design team fees to make those revisions to the design and bid specifications. It also includes work tasks to reimburse the design team for design team support through the esplanade's construction. Addendum 5 includes these additional services, resulting in a contract value increase of$46,030. Task Description I SCI Zenovic HBB Total Esplanade Response to project changes related to 1 2,000 22,830 24,830 construction design Black Ball Ferry terminal, Railroad Ave support curb design, piling modifications,and contractor requests for information in excess of initial budget allocation. 100%design Revision of design and bid specifications 0 8,000 8,100 16,100 revisions to accommodate widened trail and to respond to other agency comments. Mitigation planting Revision of West End Park design and 0 1,000 4,100 5,100 and irrigation plans specifications to reflect agency requirements for immediate improvement of rni!i gation planting at-ea. Total extra 2,000 31,830 12,200 46,030 services 11. MAXIMUM COMPENSATION Section VI of the Agreement is amended as follows: The not to exceed amount is increased by $46,030 to $1,561,172. Ill. REVISED EXHIBITS EXHIBIT "C" is amended, increasing the budget for Task 6 by $46,030 to $132,935. SECTION 3 RATIFICATION As modified herein, the AGREEMENT is confirmed and ratified. In WITNESS WHEREOF, the parties hereto have executed this Amendment No. 5 to the Agreement as of the date and year first written above. CITY OF PORT ANGELES STUDIO CASCADE, INC By: B City Manager ATTEST: Ja �saHur�dCity�Clerk��� APPROVED AS TO FORM: William E. Bloor, City motor ey