Loading...
HomeMy WebLinkAbout000650 Amendment � City Of Port Angeles Police De rtnl8Ot 321 East 5,' Street / Port Angeles, WA 98362 � � � � � � � Contract No.&Title Waterfront Camera Pr Project Manager: Brian S.Smith PD,teM Change ,�P,rt PEN Prime: Cascade Networks Order No, I Change Title:Computer hardware/software Change Scope/Justification: Testing has shown that the"virtual machine"(VIVI)application in the patrol roorn and detective work area will not allow any of the twelve VIVI connected computers to view camera images from tire Waterfront camera system, The Imagesare scrambled and distorted. The engineers with the vendor and the contractor are working on a solution but have not found anything to date that will allow officer and detective access to this system while Inside theIrwork areas. What Is proposed In the addition of one CPU,flat screen,and keyboard for the patrol room and one CPU,keyboard,and flat screen for the detective work area.. This will allow the contractor to load the needed software and conneetthe DVR,and allow the officers to use the Waterfrontcamera systern Indoors. Dosktopsoutside the VIVI and all the mobile data computers are able(through a direct Internet connect connection)to access the Waterfront camera system. Per section 4 of the contract("Expansion Clause"),this change cannot be separately bid,it Is for a reasonable purpose,the change was not known to the City or Vendor at the time of bK CONTRACT AMOUNT Mn -111---I'll 11-1-1. -11-1-1-1-1...........--..- al Contract $236,805,01 Original SUbstanti rnple Previous Time 7PievifoUS Chanige Orders N/A e o ays). 7(%ange Order This Change Order Amount(including $3845.70 Suspensiori of Work(days) N/A New Contract Amount 240,650.71 Change Order til Time No extension Extension(days) Needed. New$ubstantlal Completion As in contract CONTRACTOR:Cascade Networks, Inc, CITY OF PORTANGELES Signature Signature lw� Brian E. Magnuson, President Terry K. Gallagher,Chief of Police ' This Change Proposal shall represent full and complete compensation and final setnemootvf all Claims for all(1)time;(2) direct,|nmmc\and overhead costs;(3)pmM, and(4)costs o,dmmmgesassociated with delay,|ncummn\onco disruption of schedule,impact,ripple effect,loss of efficiency or productivity,acceleration of work,lost profits,and/or any other costs or damages related to any work either covered or affected by the Change Proposal,or related to the events giving rise to Change Proposal, mw**noe z