Loading...
HomeMy WebLinkAbout5.595 Amendment 5.595 x SNFp JAld 182001 AMENDMENT NO. 1 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE THE CITY OF PORT ANGELES AND NORTHWESTERN TERRITORIES INC. RELATING TO ENGINEERING, SURVEYING, AND PERMITTING SERVICES FOR SUBDIVISION CITY'S DELGUZZI DRIVE PROPERTIES THIS AMENDMENT NO. 1 TO THE AGREEMENT is made and entered into this al 4t day of May, 2002, by and between THE CITY OF PORT ANGELES, a non charter code city of the State of Washington, (hereinafter called the "CITY and NORTHWESTERN TERRITORIES INC., a Washington Corporation (hereinafter called the "CONSULTANT WHEREAS, the CITY entered in to an AGREEMENT with the CONSULTANT on FEBRUARY 5, 2002, and WHEREAS, the CITY desires to amend the AGREEMENT to revise the Scope of Work, Budget, and Time of Performance, NOW, THEREFORE, in consideration of the above representations and the terms, conditions, covenants and agreements set forth in the original AGREEMENT and this AMENDMENT, the parties hereto agree as follows: I REVISED SCOPE OF WORK The revised scope of professional services to be performed and the results to be achieved'by the CONSULTANT shall be as detailed in the attached Exhibit Al and shall include all services and material necessary to accomplish the work. II TIME OF PERFORMANCE The work shall be completed by JULY 31, 2002 unless extended by mutual agreement. III MAXIMUM COMPENSATION The CONSULTANT'S total compensation and reimbursement under the original Agreement and Amendment No. 1 to the Agreement, including labor, direct non -salary reimbursable costs and outside services, shall not exceed the total and subtotals for the tasks as set forth in the attached Exhibit Al Amounts budgeted for each task may be adjusted by mutual agreement without an amendment to the Agreement, as long as the maximum compensation amount of $38,500.000 is not exceeded. A IV SIGNATURES Except as modified in this Amendment No. 1 to the Agreement, the original Agreement and its Exhibits shall remain in effect. In WITNESS THEREOF, the parties hereto have executed this Amendment No. 1 to the Agreement as of the day and year first written above. CITY OF PORT ANGELES: M OR CONSULTANT: TITLE: Fri 1 cL (des eer APPROVED AS TO FORM: CRAIG KNUTS CITY ATTORNEY ATTEST: 1 1, BECKY U N, ITY CLERK N. \PROJECTS\22 -05 DelGuzzi\Amendment No 1.wpd EXHIBIT Al City of Port angeles Del Guzzi Drive Subdivision Phase 2 Cost Estimate for Final Platting Activities Task Who Type Function Status Hrs Rate Amount Task Amount 0 Preliminary Study (Phase 1) Done $3,500.00 1 Preliminary Plat Map (Directed Phase 1 Services) Done $1,672.00 2 Preliminary Plat Hearings /Mt Bob Leach Engineer Attendance Pending 8 $83 00 $664 00 Kate Waddell Technician Support Pending 4 $63 00 $252.00 $916.00 3 Prepare Construction Plans Bob Leach Engineer Design Pending 16 $83 00 $1,328 00 (Scope of work unknown) Kate Waddell Technician Design Drafting Pending 16 $63 00 $1,008.00 Debora West Technical Aide Engr Assistance Pending 4 $40 00 $160 00 $2,496.00 4 Coord w/ Other Infrastructure Bob Leach Engineer Design Pending 16 $83 00 $1,328 00 Installation, etc (Pwr, Ph, Cab Kate Waddell Technican Design Drafting Pending 8 $63.00 $504 00 Bob Leach Engineer Inspection, etc Pending 16 $83 00 $1,328 00 $3,160.00 5 Prepre Final Plat Rob Johnston Office Surveyor Design Calcs Pending 64 $83 00 $5,312 00 Bob Leach Engineer Design Pending 8 $83 00 $664 00 Brian McElravy Technican Drafting Calcs Pending 48 $63 00 $3,024.00 Field Crew Field Surveyors Staking Pending 80 $115 00 $9,200 00 Misc Fees, etc Pending 1 $500 00 $500.00 $18,700.00 6 Final Plat Hearings /Mtgs Bob Leach Engineer Attendance Pending 8 $83 00 $664 00 Kate Waddell Technician Support Pending 4 $63 00 $252 00 $916.00 7 Permitting Assistance Various Pending 1 $2,140 00 $2,140.00 $2,140.00 8 Directed Services Various Pending 1 $5,000 00 $5,000 00 $5,000.00 Estimated Cost $38,500.00 Proposed Phase 1 2 Budget "°1V $38,500.00 .'b4 ors Arc.•.a The scope of work for the installation of require�faciltiies h not yet been determined