Loading...
HomeMy WebLinkAbout000754 Original Contract City of` _ ' Record #000754 City of Port Angeles Public Works&Utilities Dept. Operations Office }7O3 South BStreet LIMITED PUBLIC WORKS PROCESS Port Angeles vYA9x3o2 Tel:360-417-4541 -^~~- Fax: 360-452-4972 Request for Quotation Z contract Contract Title: Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Project Number: WW-14-J09 THIS CONTRACT is entered into the date last below written between the CITY OF PORT ANGELES, WASHINGTON ("ClTY") AND lNSI, WASHINGTON COMPANY ("CDNTRA{3OR"). 1. WORK BY CONTRACTOR The Contractor shall perform the work as described in Attachment"A"(Attachment"A" may include Contractor's Proposal, Scope of Work, Statement of Work, Plans, Specifications, and any other related Contract Documents) which is attached hereto and by this reference is incorporated herein. 2. TERM OF CONTRACT All work under this Contract istobe completed as indicated (check one\: F71 1 m All vvorkunder this Contract is to be completed by this date: April | | All work under this Contract is to ba completed ]0 days from the Notice to Proceed. No work is to be performed prior to written Notice to Proceed by the City. �� �� The performance period under this Contract commences 5 calendar days after notice to proceed and ends . 3. PAYMENT A. The City shall pay the Contractor for the work performed under this contract (check one): FonceAccount- Time and material, not to exceed: $_____ ForceAcoount- Time and actual expenses incurred, not to exceed: $_____. Force Account~ Unit prices set forth in the Contractor's bid or quote, not to exceed: $______ M Hrrn Fixed Price set forth in Contractor bid or quote in the amount of: The Contractor shall do all work and furnish all tools, materials, and equipment, in accordance with and as described in the Attachment "A". The Contractor shall provide and bear the expense 0fall equipment, work and labor Vfany sort whatsoever that may be required for the transfer of materials and for constructing and completing the work provided for in this contract and every part thereof; except as are mentioned in the specifications to be furnished by the City of Port Angeles. B. The Contractor shall maintain time and expense records, which may be requested by the City. The contractor shall Submit invoices tothe City for payment for work performed. All invoices must reference the City's contract number. Invoices shall be in a format acceptable to the City. C. The City shall pay all invoices from the Contractor by mailing a City warrant within 30 days of receipt nfa properly completed invoice. D. All n3cou1y and accounts pertaining to this Contract are to be kept available for inspections by representatives of the City for a period of three (3) years after final payment. Copies shall be made available to the City upon request. WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page Rev. 8/30/2011 E. If during the course cf the Contract, the work rendered does not meet the requirements set forth inthe Contract, the Contractor shall correct or modify the required work to comply with the requirements of this Contract. The City shall have the right to withhold payment for such work until it meets the requirements of the Contract Documents. 4. RESPONSIBILITY KDF CONTRACTOR A. Safety. Contractor shall take all necessary precautions for the Safety of employees on the work site and shall comply with all applicable provisions of federal, state and local regulations, ordinances and codes. Contractor shall erect and properly maintain, at all times, as required by the conditions and progress ofthe work all necessary safeguards for the protection of workers and the public and shall post danger signs warning against known orunusual hazards. B. Correction of Defects. Contractor shall be responsible for correcting all defects in workmanship and/or materials discovered within one year after acceptance of this vvork. When corrections of defects are made, Contractor shall be responsible for correcting all defects in workmanship and/or materials in the corrected work for one year after acceptance of the corrections by the City. The Contractor shall start work to remedy such defects within Seven (7) days of mailing notice of discovery thereof bv City and shall complete such work within a reasonable time. In emergencies where damage may result from delay or where loss of service may result, such corrections may be made by the City, in which case the cost shall be borne by the Contractor. In the event the Contractor does not accomplish corrections at the time specified, the work will b8 otherwise accomplished and the cost ofsame shall be paid by the Contractor. C. Warranty. Contractor shall be liable for any costs, losses, expenses or damages including consequential damages suffered by the City resulting from defects in the Contractors work including, but not limited to, cost of materials and labor expended by the City in making emergency repairs and cost of engineering, inspection and supervision by the City. The Contractor shall hold the City harmless from any and all claims which may be made against the City as a result of any defective work and the Contractor shall defend any such claims at its own expense. Where materials or procedures are not specified in the Contract Document, the City will rely on the professional judgment of the Contractor to make appropriate selections. D. Nondiscrimination/Affirmative Action. Contractor agrees not to discriminate against any employee or applicant for employment or any other persons in the performance of this Contract because of race, creed, color, national origin, marital status, sex, age or handicap, or other circumstances as may be defined by federal, state or local law orordinance, except for a bona fide occupational qualification. Contractor agrees tu post in conspicuous places, available to employees and applicants for employment, notices to be provided bv Contractor setting forth the provisions of the nondiscrimination clause. E. Employment. Any and all employees of the Contractor, while engaged in the performance of any work or Services required by the Contractor under this Contract, shall be considered employees of the Contractor only and not of the City. Any and all claims that may arise under the Workers Compensation Act on behalf ofsaid employees, while so engaged, and all claims made by a third party as consequence of any negligent act or omission on the part of the Contractor's employees, while so engaged on any of the work or services provided or rendered herein, shall not be the obligation Of the City. S. COMPLIANCE WITH LAWS The Contractor shall comply with all federal, state and local laws and regulations applicable to the work done under this Contract. Any violation of the provisions of this paragraph shall be considered a violation of material provision of this Contract and shall be grounds for cancellation, termination or suspension of the Contract by the City, in whole or in part, and may result in ineligibility for further work for the City. 6. TERMINATION OF CONTRACT A. This Contract shall terminate upon satisfactory completion of the work described in Attachment "A" and final payment bv the City. VVVV'14-009; Fiber Installation at Wastewater Treatment Plant for SCAOA Upgrades Page Rev. 8/30/2011 8. The City may terminate the Contract and take possession of the premises and all materials thereon and finish the work by whatever methods itmay deem expedient, by giving 1O days written notice to the Contractor, upon the occurrence of any one or more of the events hereafter specified. 1. The Contractor makes a general assignment for the benefit of its creditors. 2. A receiver is appointed as a result of the insolvency of the Contractor. ]. The Contractor persistently or repeatedly refuses or fails to complete the work required herein. 4. Contractor fails to make prompt payment to subcontractors for material or labor. 5. Contractor persistently disregards federal, state orlocal regulations and ordinance*. 6. Contractor persistently disregards instructions of the Contract Administrator, or otherwise substantially violates the terms of this Contract. 7. The City determines that sufficient operating funds are not available to fund completion of the work contracted for. C. In the event this Contract is terminated by the City, Contractor shall not be entitled to receive any further amounts due under this Contract until the work specified in Attachment "A" is satisfactorily completed, as scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under this Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained bv the City nr which may be sustained by reason of such refusal, neglect, failure or discontinuance of employment, such excess shall be paid by the City to the Contractor. If the City's expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to the City. Such expense and damages shall include all legal o7si8 incurred by the City to protect the rights and interests of the Ob/ under the Contract, provided such legal costs shall be reasonable. 7. OWNERSHIP OF DOCUMENTS A. On payment to the Contractor by the City of all compensation due under this [bnira[1/ all finished or unfinished documents and material prepared by the Contractor with funds paid by the City under this Contract shall become the property of the City and shall be forwarded bothe City upon its request. B. Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City or by court order. 8. CLAIMS Any claim against the City for damages, expenses, costs or extras arising out of the performance of this Contract must be made in writing tothe City within thirty days after the discovery of such damage, expense or loss, and in no event later than the time of approval by the City for final payment. Contractor, upon making application for final payment, shall be deemed to have waived its right to claim for any other damages for which application has not been made, unless such claim for final payment includes notice of additional claim and fully describes such claim. 9. GENERAL ADMINISTRATION AND MANAGEMENT The Director of the Public Works and Utilities Department or his/her designee shall have primary responsibility for the City under this Contract and shall oversee and approve all work to be performed, coordinate communications, and review and approve all invoices, under this Contract. 10, INDEMINIFICATIOYW / HOLD HARMLESS A. The Contractor shall defend, indemnify and hold the City, its officers, officials, employees and volunteers harmless from any and all claims, injuries, damages, losses or suits including attorney fees, arising out o[Vr in connection with the performance of this Agreement, except for injuries and damages caused by the sole negligence of the City. B. Should a court o[competent jurisdiction determine that this Agreement is subject io RCVV4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page Rev. 8/30/2011 volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver ofimmunity under Industrial Insurance, Title 51 RCVV/ solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 11. INSURANCE The Contractor shall maintain insurance as set forth in Attachment B. 12. PREVAILING WAGE This Contract is subject Lothe requirements of Chapter 39.12 RCVV, and as it may be amended, relating to prevailing wages. On Public Works projects, funded in part or in whole with Federal funds, Federal wages laws and regulations shall also be applicable. NO WORKER, LABORER OR MECHANIC EMPLOYED INTHE PERFORMANCE OF ANY PART OF THIS CONTRACT SHALL BE PAID LESS THAN THE PREVAILING RATE OF WAGE as determined by the Industrial Statistician of the Department of Labor and Industries for the State of Washington. The schedule of prevailing wage rates for this Contract is made a part ofthis contract as though fully set forth herein. Prior to making any payment under this Contract, the City must receive an approved copy of the "Statement of Intent to Pay Prevailing Wages on Public Works Contracts" from the Department of Labor and Industries. It is the Contractor's responsibility to obtain and file the "Statement of Intent Lo pay Prevailing Wage". The Contractor shall be responsible for all filing fees. Each invoice shall include a signed statement that prevailing wages have been paid by the Contractor and all subcontractors. Following the final acceptance of services rendered, Contractor shall submit an "Affidavit ofWages Paid". Fora contract award or an on-call contract work order under $2,500, and in accordance with RCVV 39.12.040(2), the contractor or subcontractor is authorized in submit a combined Statement Of Intent To Pay Prevailing Wages &Affidavit Of Wages directly to the City of Port Angeles at final invoicing. Submission shall be made on the form developed by the Washington State Department of Labor and Industries and available from the City of Port Angeles Public Works and Utilities Department. In case any dispute arises as to what are the prevailing rates of wages for a specific trade, craft or occupation and Such dispute cannot be adjusted by the parties in interest, including labor and management representatives, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries, and his decision shall be final, conclusive, and binding on all parties involved in the dispute. 13. INTERPRETATION AND VENUE This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The venue of any litigation between the parties regarding this Contract shall be Cla||am County, Washington. 14. BRANDS OR EQUAL VVhenaspeda| "bnandorequal" isnamedi[sha|| becunstruedso|dyforthepurposomfindicaUngthedandands of quality, performance, or use desired. Brands of equal quality, performance, and use shall be considered, provided Contractor specifies the brand and model and submits descriptive literature when available. Any bid containing a brand which is not ufequal quality, performance, or use specified must be represented as an alternate and not as an equal, and failure todososhall be sufficient reason to disregard the bid. 15. INSPECTION AND REJECTION All goods, Services, work, or materials purchased herein are subject to inspection and to approval by the City. Any rejection of goods, services, work, or materials resulting because of nonconformity to the terms and specifications of this order, whether held by the City or returned, will be at Contractor's risk and expense. 16. SUBLETTING OR ASSIGNING OF CONTRACTS WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page Rev. 8/30/2011 Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties or interest accruing from this Contract without the express prior written consent of the other. 17. INDEPENDENT CONTRACTOR The Contractor is and shall be at all times during the term of this Contract an independent contractor and not an employee ofthe City. 18. EXTENT OF CONTRACT/MODIFICATION This Contract, together with the attachments and/or addenda, represents the entire and integrated Contract between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written or oral. This contract may be amended, modified or added to only by written instrument properly signed by both parties hereto. 19. SUBCONTRACTOR RESPONSIBILITY A. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include substantially the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. The requirements of this section apply to all subcontractors ragand|85a of tier. B. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meats the following bidder responsibility criteria: - At the time ofsubcontract bid submittal, have certificate nfregistration in compliance with chapter 18.27RCVV; - Have a current state unified business identifier number; - If applicable, have: • Industrial insurance coverage for the subcontractor's employees working in Washington as required in Title 51 RCVV; • An employment security department number as required in Tile 5ORCVV; and • A state excise tax registration number as required in Tile 82 RCVV; • An electrical contractor license, if required by Chapter 19.28 RCVV; • An elevator contract license, if required by Chapter 7O.87 RCVV. - Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3). VVVV'14'009; Fiber Installation at Wastewater Treatment Plant for 5CADA Upgrades Page 5 Rev. 8/30/2011 IN WITNESS WHEREOF, the parties have executed this Contract as of 2014. INTRACOMMUNICATION NETWOR CITY OF PORT ANGELES SYSTEMS,INC. By: Printed Name: � Printed Name: ADanpej "-Ce-n Title: Title: L/ Address: I 6fil City: A21- Tax ID #: �06? CJ Phone Number: Purchase Order #: Q'oofx \TWOku- WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page 6 Rev.8/30/2011 City of Port Angeles ATTACHMENT "A" Engineering Office WORK BY CONTRACTOR Public Works and Utilities Department 360-417-4541 The contractor shall do all work and furnish all tools, materials, and equipment in order to accomplish the project described below. Unless otherwise provided for in the Statement of Work, the Contractor will be responsible for obtaining and paying for any and all permits required for this work. General Scope: Installation of 12 strand fiber cables at Wastewater Treatment bJ accommodate SCAOA Upgrades. Location: Wastewater Treatment Plant, 1509 E. Columbia Street, Port Angeles, Washington Site Point of Contact: James Burka at 360-417-4809. Work Hours and Schedule: The contractor will be allowed tn work from 7 A to PM, Monday through Friday. Work outside of these hours may be requested from and is at the discretion of the City Engineer. Permits: None. Work Requirements: The Contractor shall have all work completed by April 1 11h . 1.0 Project Description This project requires 12 strand fiber cables be installed at the City of Port Angeles Wastewater Treatment Plant to accommodate the Wastewater Treatment Plant 5CAOA Upgrades. All newly installed fibers shall be pulled through existing conduits illustrated in Section 3.0 Drawings. Work shall include installing the 12 strand fiber cables from Secondary Building to each of the following buildings located at the Wastewater Treatment Plant: • Digester Control Building/ Laboratory Building • Disinfection Building � � • RAS Pump Building � • Shop/StonageBui|ding • Secondary Control Building • Administration Building • Sludge Dawmbering Building • Sludge Pumping Station • Dech|orinatiVn Building • Headworks Additional work and requirements include: 1) Termination of 12 fibers per building (6 fibers for future use) 2\ Optical time domain ref|ectomeher (OTDR) testing of all terminated fibers. 3) Contractor shall measure and determine the quantity of fiber to be installed. Contractors are invited to a pre-bid walk through at 2 PM, February 24m, 2014 where Contractors can measure and determine actual footage of fiber necessary to complete work. 4) All fiber shall be 12 Fiber mu|Umode (MM) for indoor/outdoor use. Tight Buffer 0X series terminated with Unicam Multi mode connector SC. WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page 7 Rev. 8/30/2011 , ` 5) All fiber optic cable odkjng and terminations shall be performed by trained personnel and installed in accordance with the manufacturer's recommendations, splicing and termination work. 6) Maximum total loss of fiber optic cables fibers shall not be greater than 2.5 db. 7) Active and spare fiber optic cables fibers shall be provided with a breakout kit. 8) Splices shall have loss no greater than 0.15 d8, as determined bv either a Profile Alignment System (PAS) or Light Injection (LID) splice loss estimate, aL the time the splice is made. Splices with an optical loss of greater than O.15d8 shall baredone. 9\ Installation shall be in full compliance with NEC Article 770. 10) Indoor splices shall be mounted in a splice tray and the splice trays may be stoned in either a separate indoor rack mounted splice module or within the patch panel. Outdoor splices shall be in an outdoor plant splice NEMA3orNEMA4% enclosure. 11) Post-Installation tests shall include: A. 0TDR: Conduct the following tests on each cable segment with anOTDR each optical fiber in the fiber cable. Tests shall be conducted at both 1310 and 1550 nm. No splice loss shall have a loss of 0.15 dB or greater with fiber attenuation measured in dB/km. 12) Cable Acceptance shall include: Pigtail splices shall have a loss no greater than 0.15 dB, as determined by either a Profile Alignment System (PAS) or Light Injection (LID) splice loss estimate, at the time the splice is made. Splices with an optical loss Cf greater than 0.15 dB shall be redone. OTDR traces at both 1310 nm and 1550 nm wavelengths display no unexplained losses, reflectance events, or other discontinuities. The insertion losses measured atboth 1310 nm and 1550 nm wavelengths and in both directions do not exceed the maximum allowed values. After cable tests, the cable installation shall be subject to a physical inspection to verify the remaining fiber optic specification requirements have been met. If any test requirements are not met, or in the event of fiber test failure of one or more fibers, splice or replace cable as necessary until tests pass. 13) Cable specification: • Contractor shall provide Optic Cable Corporation (D.C.C.) DX series, mu|tirn0de62.5um. 14l Wall Mounts and Rack Mounts: • The Contractor shall provide all necessary wall mounts and rack mounts to complete the work. VVe|| mount enclosure shall include SC Duplex Bulkheads. All fibers to be terminated and connected to racks at each end. 3.0 Drawings: Below is a schematic illustrating which buildings at the Wastewater Treatment Plant receive the 12 strand fiber. In addition, the attached As-Built drawings illustrate the location of the existing conduits runs to be used for pulling fiber. WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page 8 Rev. 8/30/2011 Schematic Dechlorinetion Shop/Storage Disinfection Administration Secon Buii+ e / �h i�le �airic RAS Buil4ing Sludge Sludge Pumping ii. � � � Y WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page 9 Rev. 8/30/2011 it zi Ilk 1.4 CL on ki Fa Ulu (a 0 6 ?R OA Pip nn ti.. C I sn f cn 1 � �., pis 7 N ry _ � 1 ei _ go k , ,e�� 1 cn Q 06 F o m p i � f } g .e. SVd i Rig go .A IN I H � P N , . o 1 � L t' ,w m + yyq 1 r � r p y 4e„ All kA q cw 'YWyyW'�0 r t w � G a• r y coin) - t ]�yy C7 f 7.. t t I r ^ w n v� \r rv,^,f ^ pµ4^✓i ug r ?4 4 Hit a CD p e M Y f ^ 4 0 3, ary W � 4YA 'WY Y I I � 1 e dr b WW Inds " elk p ra i .. � ,a� � 4� �✓X fib ,� nY"h a x•14., n ,..., ` City of Port Angeles ATTACHMENT "B" Engineering Office INSURANCE Public Works and Utilities Department 360-417-4541 INSURANCE REQUIREMENTS FOR CONSTRUCTION AND SERVICE CONTRACTS Includes construction and remodeling,janitorial service, tree maintenance, road maintenance,painting, electrical Work,plumbing, movers, and on site maintenance agreements. Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. No Limitation Contractor's maintenance of insurance, its scope of coverage and limits as required herein shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or other-wise limit the City's recourse to any remedy available at law or in equity. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products- completed operations, stop gap liability, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85 or an equivalent endorsement. There shall be no endorsement or modification of the Commercial General Liability Insurance for liability arising from explosion, collapse or underground property damage. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO Additional Insured endorsement CG 20 10 10 01 and Additional Insured-Completed Operations endorsement CG 20 37 10 01 or substitute endorsements providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page 14 Rev. 8/30/2011 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of$1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and $2,000,000 products-completed operations aggregate limit. Other Insurance Provision The Contractor's Automobile Liability and Commercial General Liability insurance policies are to contain, or be endorsed to contain that they shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A: VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors The Contractor shall have sole responsibility for determining the insurance coverage and limits required, if any, to be obtained by subcontractors, which determination shall be made in accordance with reasonable and prudent business practices. G. Notice of Cancellation The Contractor shall provide the City and all Additional Insureds for this work with written notice of any policy cancellation, within two business days of their receipt of such notice. H. Failure to Maintain Insurance Failure on the part of the Contractor to maintain the insurance as required shall constitute a material breach of contract, upon which the City may, after giving five business days notice to the Contractor to correct the breach, immediately terminate the contract or, at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, offset against funds due the Contractor from the City. WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page 15 Rev. 8/30/2011 ' City of Port Angeles ATTAC H M E NT "C" Engineering Office PREVAILING WAGE RATES Public Works and Utilities Department 300-417-4541 See attached listing: l. Washington State Prevailing Wage Rates For Public WorksContracto—Journey Level and Apprentices, C\a]lum County, effective March 5, 2014. 2. To access applicable prevailing rate(s) of wages rates for the describe work by trade,use the following Labor and Industries vveboiiclink: 3. A copy of the applicable prevailing wage rates can be obtain by contacting Lucy Hanley at 360-417-4541 or by email, . /\hard copy ie available for viewing io person at32lE. 5 m Street, Port Angeles, W/\. 90302. vvvv-14'009i Fiber Installation ^,Wastewater Treatment Plant for o",D""py.""=s ^"e~ ^~ Rev. 8/30/2011 City of Port Angeles ATTAC HM E NT "D" Engineering Office QUOTE RECEIVED Public Works and Utilities Department 360-417-4541 WW-14-009; Fiber Installation at Wastewater Treatment Plant for SCADA Upgrades Page 17 Rev. 8/30/2011 Mar. 4. 2014 2: 1$PM I N S I No. 2630 P. 2 QUOTATION FORM Project Title: Fiber In5t4UQUon am.(t�1�v?ter Tr�gtment Plant Par SCADA Upgrades Project NumberWW-14-009 The bidder hereby bids the following amounts for all work(Including labor, equipment, time and materials)required to perform the work In the Statement of Work and this package. 1. Lump Sum $ 1 V 995 r 00 2, Sales Tax(8,4%) 3. Total Bid $__ 5.The bidder hereby acknowledges that it has received Addenda N1 A (Enter"N/A"If none were issued)to this Request for Quotation package. 6. The name of the bidder submitting this bid and Its business phone number and address, to whioh address all communications concerned with this bid and with the contract shall be sent, are listed below.Any written notices required by the terms of an awarded contract shall be served or malled to the following address: +�ottltr�cto r 'o . 1. Company Name: 2.Address: J q 2.2L. 3.City, State,Zip Code: 4. Phone Number; 5.Contractor Registration Number: A/rg, 9 q q LL 6. UBI Number: � —�(90 (o I tK 2- 7. WA State Industrial Insurance Account Number: q.5 S.WA State Employment Security dept Number: t 2 15 9 g 0 0 1 9. State Excise Tax Registration Number: — 16 00 (. 3 1�5 _ The bidder represents that it Is qualifie p ssesses su ient skills and the necessary capabilities to perform the servi;M/ n t ' ntr t. Signed by Title Printed Name: Date -14-009,Fiber Installation at Wastewater Treatment P @ant for SCADA Upgrades Page 3 Rev 8/30/2011 I